WorldWideScience

Sample records for project kickoff meeting

  1. Future Circular Collider Study (FCC) kick-off meeting | 12-15 February

    CERN Multimedia

    2014-01-01

    The kick-off meeting of the international "Future Circular Collider Study" (FCC) will take place in Geneva from 12 to 15 February 2014 at the University of Geneva, Unimail site. The programme and registration details can be found on the meeting's website. This meeting is the starting point of the five-year international "Future Circular Collider Study" (FCC). The main emphasis of the conceptual design study will be on a hadron collider with a centre-of-mass energy of the order of 100 TeV in a new tunnel with a 80-100 km circumference for the purposes of studying physics at the highest energies. The study will also include a lepton collider, as a potential intermediate step towards realisation of the hadron facility. Options for e-p scenarios will also be considered. The main purpose of this meeting is to discuss the study topics and to prepare international collaborations. The meeting is a public meeting with a registration deadline closing on Friday 31 Janua...

  2. Physics beyond Colliders Kickoff Workshop

    CERN Document Server

    2016-01-01

    The aim of the workshop is to explore the opportunities offered by the CERN accelerator complex and infrastructure to get new insights into some of today's outstanding questions in particle physics through projects complementary to high-energy colliders and other initiatives in the world. The focus is on fundamental physics questions that are similar in spirit to those addressed by high-energy colliders, but that may require different types of experiments. The kickoff workshop is intended to stimulate new ideas for such projects, for which we encourage the submission of abstracts.

  3. EuroCirCol kick-off event

    CERN Multimedia

    Hardre, Julie

    2015-01-01

    The EuroCirCol (http://cern.ch/eurocircol) kick-off event at CERN on June 2-4 brought together 62 participants to constitute governance bodies, commit to the project plan and align the organisation, structures and processes of 16 institutions from 10 countries. The goal of the project is to conceive a post-LHC research infrastructure around a 100 km circular energy-frontier hadron collider capable of reaching 100 TeV collisions. The project officially started on June 1 and will run for four years. The total estimated budget of 11.2 million Euros includes a 2.99 million Euro contribution from the Horizon 2020 programme on developing new world-class research infrastructures (http://cordis.europa.eu/project/rcn/194962_en.html).

  4. Deceleration project bursts out of the starting-blocks

    CERN Multimedia

    Anaïs Schaeffer

    2011-01-01

    The starter's pistol was fired for the ELENA project on 28 September, with the kick-off meeting organised in collaboration with the Antiproton Decelerator Users Committee. With more than 90 scientists in attendance from 20 research centres throughout the world expressing their enthusiasm for the project…and some even more than that... the meeting was a great success.   "Our kick-off meeting was a really great success," says Stéphan Maury of the Beams (BE) Department, who is responsible for the ELENA (Extra Low ENergy Antiproton ring) project. PH Department's Walter Oelert, Chairman of the AD Users Committee and one of the instigators of the project, adds: "More than 90 participants showed up, over twice the number we were expecting! They were all very enthusiastic and eager to get ELENA off the ground." The meeting was attended by representatives of some twenty institutes from across the globe, all of whom had come to bl...

  5. FIRST LEGO League Kickoff

    Science.gov (United States)

    2007-01-01

    Randall Hicks (right), Jacobs Technology's Education Services manager at NASA John C. Stennis Space Center, answers questions about the playing field for FIRST (For Inspiration and Recognition of Science and Technology) LEGO League's 2007 Challenge, `Power Puzzle.' More than 140 teachers, mentors, parents and students from 15 schools attended the Sept. 15 FLL season kickoff at StenniSphere, the visitor center at SSC. The teams from southern and central Mississippi and Mobile, Ala., who came to SSC heard rules for and asked questions about `Power Puzzle,' and saw robot demonstrations by Gulfport and Picayune high schools' past FIRST Robotics competitions. Using LEGO Mindstorms NXT kits, FLL teams of children ages 9-14 will spend the next three months building and programming robots to perform 'Power Puzzle's' challenge tasks, then pit them in competitions. They also will submit a research project about how energy choices impact the environment and the economy. The season will culminate at the Mississippi Championship Tournament on Dec. 8 at the Mississippi Gulf Coast Community College. FLL, considered the `little league' of the FIRST Robotics Competition, partners FIRST and the LEGO Group. Competitions aim to inspire and celebrate science and technology using real-world context and hands-on experimentation. NASA recognizes FIRST activities as an excellent hands-on method to increase student knowledge of science, engineering, technology and mathematics. Schools represented in this year's kickoff were: Madison Avenue Upper Elementary, the Mississippi Band of Choctaw Indians' Conehatta Elementary, Hattiesburg's Lillie Burney Elementary, Pearl Upper Elementary, Long Beach Middle, Oktibehha Elementary, d'Iberville Middle, Saucier's West Wortham Middle, Picayune's Nicholson Elementary and Roseland Park Baptist Church Academy, Bay St. Louis' St. Stanislaus College and Mobile's Davidson High, as well as two home-school groups from the Jackson area.

  6. UAS Integration in the NAS Project Test Site Kick-off Meeting

    Science.gov (United States)

    Kopardekar, Parimal; Witzberger, Kevin; Hackenberg, Davis L.; Murphy, Jim

    2015-01-01

    This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

  7. Minutes of the kick-off Meeting of the WPRS / EGRPANS / Sodium Fast Reactor Task Force (SFR)

    International Nuclear Information System (INIS)

    Buiron, Laurent; Stauff, Nicolas; Varaine, Frederic; Blanchet, D.; Stauff, N.; Ivanov, Evgeny; Michel-Sendis, Franco; ); Mikityuk, Konstantin; Pelloni, Sandro; Ponomarev, Alexander; Kim, Taek K.; Taiwo, Temitope; Kereszturi, Andras; Van den Eynde, Gert; Kotiluoto, Petri; Juutilainen, Pauli; Lepp Anen, Jaakko

    2011-01-01

    The kick-off meeting of the Sodium-cooled fast reactor Task Force (SFR) was an informal one where discussion among participants was encouraged. F. Varaine reminded the participants of the objectives and milestones of the proposed benchmark. A discussion followed on how to define transients in a safety approach. Speaking for ANL, T.A Taiwo anticipated the need to include experts from ANL safety division in the thermal-hydraulics/transient part of the benchmark and observed the initial timeline proposed was too tight to meet. It was agreed the timeline of the benchmark would be modified to a more realistic schedule, keeping the neutronic part as the first stage to finish before the end of the year. It was decided that CEA would provide a spreadsheet template to fill out by benchmark participants to facilitate compilation of results. During the presentations, L. Buiron presented the benchmark in detail and introduced the bibliographic study he has been compiling with the aim to develop a state of the art of feedback calculations. He reported this work is ongoing and could become a contribution for a report of the Expert Group. E. Ivanov presented a proposal for complementary calculations to be included in the benchmark. He reported these calculations would allow for interpretation of the discrepancies that may be observed between the different results obtained by the participants, and commented such an interpretation is essential in any safety analysis presented before decision-makers. A discussion followed on the necessity to include the additional calculations proposed by IRSN at such an early state of the benchmark. The proposal was met with interest, and it was decided that it would be discussed again at the next meeting where first neutronic results could be shown and the importance of these calculations demonstrated. E. Ivanov agreed to provide more detailed specifications of the tallies requested by the next meeting. It was decided that these complementary

  8. 76 FR 1386 - Safety Zone; Centennial of Naval Aviation Kickoff, San Diego Bay, San Diego, CA

    Science.gov (United States)

    2011-01-10

    ...-AA00 Safety Zone; Centennial of Naval Aviation Kickoff, San Diego Bay, San Diego, CA AGENCY: Coast... zone on the navigable waters of San Diego Bay in San Diego, CA in support of the Centennial of Naval... February 12, 2010, the Centennial of Naval Aviation Kickoff will take place in San Diego Bay. In support of...

  9. Light induced kickoff of magnetic domain walls in Ising chains

    Science.gov (United States)

    Bogani, Lapo

    2012-02-01

    Controlling the speed at which systems evolve is a challenge shared by all disciplines, and otherwise unrelated areas use common theoretical frameworks towards this goal. A particularly widespread model is Glauber dynamics, which describes the time evolution of the Ising model and can be applied to any binary system. Here we show, using molecular nanowires under irradiation, that Glauber dynamics can be controlled by a novel domain-wall kickoff mechanism. Contrary to known processes, the kickoff has unambiguous fingerprints, slowing down the spin-flip attempt rate by several orders of magnitude, and following a scaling law. The required irradiation power is very low, a substantial improvement over present methods of magnetooptical switching: in our experimental demonstration we switched molecular nanowires with light, using powers thousands of times lower than in previous optical switching methods. This manipulation of stochastic dynamic processes is extremely clean, leading to fingerprint signatures and scaling laws. These observations can be used, in material science, to better study domain-wall displacements and solitons in discrete lattices. These results provide a new way to control and study stochastic dynamic processes. Being general for Glauber dynamics, they can be extended to different kinds of magnetic nanowires and to a myriad of fields, ranging from social evolution to neural networks and chemical reactivity. For nanoelectronics and molecular spintronics the kickoff affords external control of molecular spin-valves and a magnetic fingerprint in single molecule measurements. It can also be applied to the dynamics of mechanical switches and the related study of phasons and order-disorder transitions.

  10. 1990 Fall Meeting Report

    Science.gov (United States)

    Chapman, David S.

    The AGU 1990 Fall Meeting, held in San Francisco December 3-7, continued the steady growth trend for the western meeting set over the last decade. About 5200 members registered for the meeting and 3836 papers were given. The scientific kickoff to the meeting was provided by a Union session on initial results of the current Magellan mission to Venus. The mission was also the focus of a public lecture and short film on highlights of the mission and an extensive Union poster session.

  11. Dynamic control of magnetic nanowires by light-induced domain-wall kickoffs

    Science.gov (United States)

    Heintze, Eric; El Hallak, Fadi; Clauß, Conrad; Rettori, Angelo; Pini, Maria Gloria; Totti, Federico; Dressel, Martin; Bogani, Lapo

    2013-03-01

    Controlling the speed at which systems evolve is a challenge shared by all disciplines, and otherwise unrelated areas use common theoretical frameworks towards this goal. A particularly widespread model is Glauber dynamics, which describes the time evolution of the Ising model and can be applied to any binary system. Here we show, using molecular nanowires under irradiation, that Glauber dynamics can be controlled by a novel domain-wall kickoff mechanism. In contrast to known processes, the kickoff has unambiguous fingerprints, slowing down the spin-flip attempt rate by several orders of magnitude, and following a scaling law. The required irradiance is very low, a substantial improvement over present methods of magneto-optical switching. These results provide a new way to control and study stochastic dynamic processes. Being general for Glauber dynamics, they can be extended to different kinds of magnetic nanowires and to numerous fields, ranging from social evolution to neural networks and chemical reactivity.

  12. Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.

    Science.gov (United States)

    Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob

    2016-05-01

    The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."

  13. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  14. Intelum project: tackling the calorimetry challenge for future high-energy colliders

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    Intelum is one of the CERN-coordinated projects funded under H2020. It aims to develop low-cost, radiation-hard scintillating and Cherenkov crystal and glass fibres for the next generation of calorimeter detectors for future high-energy experiments. This new technology could also have important applications in the medical imaging field.     Intelum project partners at the kick-off meeting held on 11 March at CERN.   Intelum is an H2020 Marie Skłodowska-Curie Research and Innovation Staff Exchange (RISE) project coordinated by CERN. This project was initiated by the Crystal Clear Collaboration (CERN’s RD18 experiment), which has been developing inorganic scintillation materials for novel ionising-radiation detectors for 25 years. Intelum is an international consortium including fifteen institutes and companies from across western and eastern Europe, Japan and the USA, all of which are experts in crystal growth, scintillating mechanisms, radiation damage and dete...

  15. Supporting PECO countries in combating illicit trafficking of nuclear materials - Status of ongoing projects

    International Nuclear Information System (INIS)

    Janssens, W.; Daures, P.; Cromboom, O.; Mayer, K.; Koch, L.

    2001-01-01

    Full text: In order to support the development of an efficient and validated response to counteract illicit trafficking of nuclear materials in the EU, the candidate countries and some CIS countries, ITU is currently executing a series of dedicated projects with the Candidate Countries to the European Union, based upon the experience gained in previous Phare and Tacis projects. Following the recommendations of the International Technical Working Group (ITWG), the objectives of the projects are: assessment of the national situation during a fact-finding mission in the country; technical upgrade and/or training related to the categorisation of nuclear material on the spot and assistance for the identification of seized nuclear material, through joint analysis at ITU; implementation of the recommended Model Action Plan in the form of a national handbook called RITNUM (Response to Illicit Trafficking of NUclear Material); validation of the national Model Action Plan by the organisation of a demonstration exercise in the country involving all the identified services in the field. After a kick-off meeting held in Karlsruhe in November 2000 and attended by two participants of each country, 5 fact-finding missions have been already performed (Romania, Slovenia and the three Baltic States). A general meeting with all the involved parties (Customs, Police, Intelligence services. Health Physics, Nuclear reference laboratory...) was organised to describe the procedure of the integrated response and the national needs were assessed. The corresponding training sessions are planed in January 2002 at ITU for three participants for each country (Customs and Police officer and high level scientist dealing with nuclear measurements). This training session will be organised and supported by IAEA which have a common interest through its Regional Program on Combating Illicit Trafficking (RER60). This joint action will be extended to other eastern countries (ex. Belarus) on IAEA request

  16. The ITER divertor cassette project meeting

    International Nuclear Information System (INIS)

    Merola, M.; Riccardi, B.; Tivey, R.

    1999-01-01

    The Divertor Cassette Project topical meeting was held on May 26-28, 1999 at the ENEA Brasimone Research Centre in Camugnano (Bologna), Italy. Specialists from all the four Parties and the JCT participated in the meeting. It was concluded that the Divertor Cassette Project has significantly contributed to solving a large part of the critical issues of the ITER divertor design

  17. THE BIOCATALYTIC DESULFURIZATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Steven E. Bonde; David Nunn

    2003-01-01

    During the first quarter of the Biological Desulfurization project several activities were pursued. A project kickoff meeting was held at the Diversa facility in San Diego, CA. Activities that were in process before the meeting and begun afterwards by Diversa Corporation and Petro Star Inc. include: Technology transfer in the form of information generated by Enchira to Diversa, the purchase and installation of equipment by Diversa, development of synthetic methods and preparation of organo-sulfur substrates for use in determining enzyme activities, production of extract via Petro Star's CED process, detailed analysis of Petro Star Inc. diesel and CED extract, and several activities in molecular biology. Diversa Corporation, in the area of molecular biology, engaged in several activities in support of the task list of the contract. These included: construction of a genomic library; development and utilization of a sequence-based gene discovery effort; a parallel discovery approach based on functional expression of enzymes with the ability to oxidize organosulfur compounds. Biodesulfurization genes have already been identified and are being sequenced and subcloned for expression in heterologous biological hosts. Diversa has evaluated and adapted assays developed by Enchira used to assess the activities of DBT and DBTO{sub 2} monooxygenases. Finally, Diversa personnel have developed two novel selection/screen strategies for the improvement of biocatalyst strains by directed evolution.

  18. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  19. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER co-ordinated technical activities project board took place in Tokyo, Japan, on 21 January 2002, coinciding with the second Negotiators meeting (N2). Twelve participants, project board members and experts from Canada, European Union, the Russian Federation and the international team attended the meeting. The project board agreed to provide an R and D plan by June 2002, to be linked with the procurement allocation, for the period following the CTA. The ITER International Team Leader developed a proposal on establishing the working groups for drafting technical specifications for the most urgent procurement items

  20. Online math education (MUMIE) for numerical analysis and linear algebra

    NARCIS (Netherlands)

    Vuik, K.; Daalderop, F.; Wilders, P.; Daudt, J.; Van Kints, R.; Koolstra, K.; Van den Oever, J.; Lobbezoo, B.

    2013-01-01

    This report gives an overview of the work done on MUMIE [2] at TU Delft for the academic year 2012 - 2013. Reports from previous years can be found on our relevant support website [3]. In October 2012 there was a kick-off meeting at TU Berlin regarding the S3M2 project [1]. During this meeting,

  1. Meeting of the ITER CTA project board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    This is information about meeting of the ITER CTA project board, which took place in Moscow, Russian Federation on 22 April 2002 on the occasion of the Third Negotiators Meeting (N3). Thirteen participants, representing PB members and experts from Canada (CA), the European Union (EU), Japan(JA), the Russian federation (RF) and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. The Project Board took note of the comments made concerning the status of the Participants Teams(PTs)

  2. The First Meeting of the WHO Guideline Development Group for the Revision of the WHO 1999 Guidelines for Iodine Thyroid Blocking

    International Nuclear Information System (INIS)

    Reiners, Christoph; Schneider, Rita; Akashi, Makoshi; Akl, Eli A.; Jourdain, Jean-Rene; Li, Chunsheng; Murith, Christoph; Van Bladel, Lodewijk; Yamashita, Shunichi; Zeeb, Hajo; Vitti, Paolo; Carr, Zhanat

    2016-01-01

    The meeting held in May 2014 in Wuerzburg, Germany, discussed the scope of the revision of the 1999 WHO guidelines for iodine thyroid blocking (ITB) by following the WHO handbook for guideline development. This article describes the process and methods of developing the revised, evidence-based WHO guidelines for ITB following nuclear and radiological accidents, the results of the kick-off meeting as well as further steps taken to complete the revision. (authors)

  3. The ITER Divertor Cassette Project meeting

    International Nuclear Information System (INIS)

    Akiba, M.; Tivey, R.

    2000-01-01

    The Divertor Cassette Project topical meeting took place on April 5-7, 2000 at the JAERI Naka site in Japan. The meeting focused on the progress made by the three parties under task agreements on the development of carbon-fibre composite and tungsten armored high flux plasma-facing components

  4. GeneLab Analysis Working Group Kick-Off Meeting

    Science.gov (United States)

    Costes, Sylvain V.

    2018-01-01

    Goals to achieve for GeneLab AWG - GL vision - Review of GeneLab AWG charter Timeline and milestones for 2018 Logistics - Monthly Meeting - Workshop - Internship - ASGSR Introduction of team leads and goals of each group Introduction of all members Q/A Three-tier Client Strategy to Democratize Data Physiological changes, pathway enrichment, differential expression, normalization, processing metadata, reproducibility, Data federation/integration with heterogeneous bioinformatics external databases The GLDS currently serves over 100 omics investigations to the biomedical community via open access. In order to expand the scope of metadata record searches via the GLDS, we designed a metadata warehouse that collects and updates metadata records from external systems housing similar data. To demonstrate the capabilities of federated search and retrieval of these data, we imported metadata records from three open-access data systems into the GLDS metadata warehouse: NCBI's Gene Expression Omnibus (GEO), EBI's PRoteomics IDEntifications (PRIDE) repository, and the Metagenomics Analysis server (MG-RAST). Each of these systems defines metadata for omics data sets differently. One solution to bridge such differences is to employ a common object model (COM) to which each systems' representation of metadata can be mapped. Warehoused metadata records are then transformed at ETL to this single, common representation. Queries generated via the GLDS are then executed against the warehouse, and matching records are shown in the COM representation (Fig. 1). While this approach is relatively straightforward to implement, the volume of the data in the omics domain presents challenges in dealing with latency and currency of records. Furthermore, the lack of a coordinated has been federated data search for and retrieval of these kinds of data across other open-access systems, so that users are able to conduct biological meta-investigations using data from a variety of sources. Such meta

  5. New EU project supports LHC theorists

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    LHCPhenonet, a new EU-funded research network aimed at improving the theoretical predictions that guide the LHC experiments, has begun its 4-year run as a Marie Curie Initial Training Network. CERN joins the network as an associate partner, along with almost 30 multinational institutions and computing companies.   Theorists from around the world gathered in Valencia to attend LHCPhenonet's kick-off meeting. LHCPhenonet will create research opportunities for young, talented European theorists, providing funding for both doctoral and post-doctoral positions across the various participating institutions – including the University of Durham, DESY, and the Istituto Nazionale di Fisica Nucleare (INFN). LHCPhenoNet aims to improve the Quantum Field Theory calculations that set the parameters of the LHC experiments, focusing on the LHC phenomenology that gave it its name. The 4.5 million euro project is funded by the EU's 7th Research Framework Programme and will be coordinated through the Span...

  6. Research coordination meeting of the coordinated research project on analytical and experimental benchmark analyses of accelerator driven systems. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The Technical Meeting hosted at the Belarus National Academy of Sciences in Minsk by the Joint Institute of Power Engineering and Nuclear Research 'SOSNY' from 5-9 December 2005 was the kick-off Research Coordination Meeting (RCM) of the IAEA Coordinated Research Project (CRP) on 'Analytical and Experimental Benchmark Analyses of Accelerator Driven Systems (ADS)'. The CRP had received proposals for research agreements and contracts from scientists representing the following 25 institutions: Centro Atomico Bariloche, SCK CEN Mol, Instituto de Pesquisas Energeticas e Nucleares Sao Paulo, Joint Institute of Power Engineering and Nuclear Research SOSNY Minsk, China Institute of Atomic Energy, CEA Cadarache, CNRS Paris, FZ Rossendorf, FZ Karlsruhe, Budapest University of Technology and Economics, Politecnico di Torino, Japan Atomic Energy Agency, Nuclear Research and Consultancy Group (NRG) Petten, Pakistan Institute of Nuclear Science and Technology, AGH-University of Science and Technology Krakow, Institute of Atomic Energy Otwock/Swierk, ITEP Moscow, MEPHI Moscow, Kurchatov Institute, JINR Dubna, Universidad Politecnica de Madrid, CIEMAT Madrid, Royal Institute of Technology Stockholm, National Science Center 'Kharkov Institute and Technology', and Argonne National Laboratory). These institutions represent 18 IAEA Member States (i.e., Argentina, Belarus, Belgium, Brazil, China, France, Germany, Hungary, Italy, Japan, Netherlands, Pakistan, Poland, Russia, Spain, Sweden, Ukraine, USA), and one International Organization (JINR Dubna). The overall objective of the CRP is contributing to the generic R and D efforts in various fields common to innovative fast neutron system development, i.e., heavy liquid metal thermal hydraulics, dedicated transmutation fuels and associated core designs, theoretical nuclear reaction models, measurement and evaluation of nuclear data for transmutation, and development and validation of calculational methods and codes. Ultimately, the CRP

  7. Medical imaging projects meet at CERN

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    ENTERVISION, the Research Training Network in 3D Digital Imaging for Cancer Radiation Therapy, successfully passed its mid-term review held at CERN on 11 January. This multidisciplinary project aims at qualifying experts in medical imaging techniques for improved hadron therapy.   ENTERVISION provides training in physics, medicine, electronics, informatics, radiobiology and engineering, as well as a wide range of soft skills, to 16 researchers of different backgrounds and nationalities. The network is funded by the European Commission within the Marie Curie Initial Training Network, and relies on the EU-funded research project ENVISION to provide a training platform for the Marie Curie researchers. The two projects hold their annual meetings jointly, allowing the young researchers to meet senior scientists and to have a full picture of the latest developments in the field beyond their individual research project. ENVISION and ENTERVISION are both co-ordinated by CERN, and the Laboratory hosts t...

  8. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  9. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER CTA Project Board (PB) took place in Toronto, Canada on 16 September 2002 on the occasion of the fifth Negotiations Meeting (N-5). Thirteen participants, PB members and experts from Canada, EU, Japan, RF and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. PB heard progress reports of the participating parties and the comments concerning the status of participants team (PT) and the IT were presented

  10. FAA and NASA UTM Research Transition Team: Communications and Navigation (CN) Working Group (WCG) Kickoff Meeting

    Science.gov (United States)

    Jung, Jaewoo; Larrow, Jarrett

    2017-01-01

    This is NASA FAA UTM Research Transition Team Communications and Navigation working group kick off meeting presentation that addresses the followings. Objectives overview Overall timeline and scope Outcomes and expectations Communication method and frequency of meetings Upcoming evaluation Next steps.

  11. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  12. Report on the CSC project group meeting on alternative energy resources

    International Nuclear Information System (INIS)

    1977-11-01

    Under its coordinated R and D programme the Commonwealth Science Council in cooperation with the Ministry of Agriculture, Food and Consumer Affairs, Barbados, organized a meeting to identify suitable projects for inter-country collaboration. Specifically the meeting had three aims: 1. Review present state of activities in alternative energy resources and assess small scale energy needs in the region. 2. Identify specific projects for inter-country collaboration. 3. Draft joint project proposals for such collaboration. A small group of experts (Annex VII) from Britain, Canada, USA and CSC secretariat staff made detailed plans for the Barbados meeting. With a view to assessing real energy needs locally, the Group recommended that a study be undertaken in Barbados prior to the meeting. A report on such a study was presented at the meeting. Member countries were also invited to prepare country papers. In addition, following the planning Group's recommendation, several technical papers were prepared. These covered subjects ranging from conceptual aspects to clarify objectives, assumptions and criteria to a review of all alternative energy technologies

  13. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    2001-01-01

    Full text: A preparatory meeting of the Co-ordinated Technical Activities (CTA) Project Board took place in Vienna on 16 July 2001. The Board Members of Canada, EU, Japan, RF and of the CTA International Team participated in the Meeting, which was chaired by Acad. E. Velikhov. The major item on the Meeting Agenda was the discussion of the scope of the CTA. In this discussion the following comments were expressed: One of the prime objectives during the CTA is to develop technical specifications for procurement of critical items (magnets, vacuum vessel, and buildings). It was noted that the discussions with potential suppliers should confirm manufacturing processes in details in order to explore possible schedule reduction strategies. Safety analysis and licensing preparation should proceed on all proposed sites up to the preferred site designation, to ensure the overall implementation schedule is minimized and to resolve major technical issues needed for licensing. Several R and D issues remain to be further developed during the CTA. Special attention should be given by the Participants to two areas: Diagnostics; Heating and Current Drive Systems. Arrangements for continuation of the ITER Physics Expert Groups activities should be provided. To this end a new framework, called International Tokamak Physics Activity, is being planned. The Board encouraged the Participants' Representatives in the Co-ordinating committee of this activity to support the preparation for urgent Topical Group Meetings. The Board agreed that the Design Authority will be invested in the International Team and that proposals for site specific design changes should be agreed upon by the International Team Leader before being studied in detail. The Meeting agreed on some arrangements which will remain from the EDA, namely the ITER EDA Council Office in Moscow as Office of the PB Chair, and the ITER Office located at the IAEA in Vienna as agreed by the IAEA. The Board recommended that effective

  14. The Effects of the Clock and Kickoff Rule Changes on Actual and Market-Based Expected Scoring in NCAA Football

    Directory of Open Access Journals (Sweden)

    Kenneth Linna

    2014-04-01

    Full Text Available Clock rule changes were introduced in the 2006 season with the goal of reducing the average duration of the game; these changes were reversed in 2007. In addition, in 2007 the kickoff rule was changed to create more excitement and potentially more scoring. We examine what happened to actual and expected scoring during these National Collegiate Athletic Association (NCAA football seasons. The clock rule change in 2006 led to lower scoring which was not fully encompassed in the betting market, leading to significant returns to betting the under. Multiple rule changes in 2007 led to volatility in the betting market that subsided by season’s end.

  15. Talking in Taejon : regional cooperative agreement project formulation meeting

    International Nuclear Information System (INIS)

    McEwan, A. C.

    1997-01-01

    The International Atomic Energy Agency as part of its Regional Cooperative Agreement (RCA) with countries in east Asia and the neighboring Pacific, has had a project on strengthening radiation protection infrastructures operating for some years. This project has arranged training courses, workshops and other activities on a range of topics related to establishing or improving radiation protection measures and safety of radiation sources in member states of the region. A second 5 year phase of planned activities is to be concluded during 1997, and the value of the project is such that member coutntries proposed its continuation for a further 5 year period commencing in 1998. For this purpose a Task Group took the lead in assembling and evaluating proposals for consideration and approval at a meeting of national coordinators for the project held in Taejon Korea, 24-28 February. The RCA project for Phase III will be titled Enhancement and Harmonisation of Radiation Protection. The meeting of national coordinators from the region represents a unique opportunity for information sharing and cooperation in radiation protection betweem countries. (author)

  16. 77 FR 5750 - Major Capital Investment Projects (NPRM); Public Meetings

    Science.gov (United States)

    2012-02-06

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects (NPRM); Public Meetings AGENCY: Federal Transit... Capital Investments program (``New Starts'' and ``Small Starts''). During these sessions, FTA staff will... amend the regulations for Major Capital Investment Projects at 49 CFR 611. The docket for comments on...

  17. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  18. 76 FR 10944 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-28

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee will be held Tuesday...

  19. Contact expert group for international radwaste projects. Fourth meeting

    International Nuclear Information System (INIS)

    1997-06-01

    The Contact Expert Group for International Radwaste Projects is the result of an IAEA seminar on ''International Co-operation on Nuclear Waste Management in the Russian Federation'', 15-17 May 1995, that was requested and sponsored by the Nordic countries. In two working groups at the Seminar, participants from the Russian Federation and 17 countries and international organizations co-operating with the Russian Federation in waste management projects recognized the need for setting up a contact group of experts to assist in co-ordinating their efforts. Such co-ordination would help avoid redundancy and duplication of effort, assure that priority needs were made known to the international community, and provide points of contact to facilitate co-operation. This report is a compilation of the 4. CEG meeting materials, both prepared by the CEG Secretariat and presented by meeting's participants. The materials discussed by the CEG and subsequently modified are presented in the finally approved version. As in the case of previous similar reports, the documentation presented was just compiled without any editing and thus should be considered only as ''working proceedings'' of the meeting

  20. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  1. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  2. 75 FR 33893 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-06-15

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  3. 75 FR 55405 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-09-10

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  4. 75 FR 18957 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-04-13

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  5. 75 FR 47348 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-08-05

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  6. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-10-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  7. 75 FR 7539 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-02-19

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  8. 75 FR 11999 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-03-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  9. 75 FR 39331 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-07-08

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  10. 75 FR 4140 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-01-26

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  11. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  12. 76 FR 45006 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-07-27

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, September 26, 2011, at 3 p.m...

  13. 75 FR 47349 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-08-05

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, September 22, 2010, at 1 p.m. Eastern Time...

  14. 76 FR 56879 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-09-14

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, October 24, 2011, at 3 p.m. Eastern Time...

  15. 75 FR 62632 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-10-12

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, November 24, 2010, at 1 p.m. Eastern Time via...

  16. 75 FR 39333 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-07-08

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, August 25, 2010, at 1 p.m. Eastern Time via...

  17. 76 FR 63716 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-10-13

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, November 28, 2011, at 3 p.m. Eastern Time...

  18. 76 FR 37199 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-24

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Monday, August 22, 2011, at 3 p.m. Eastern Time via...

  19. 75 FR 55406 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-09-10

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, October 27, 2010, at 1:00 p.m. Eastern Time...

  20. 76 FR 6188 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-03

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, March 28, 2011, at 2 p.m., Eastern...

  1. The Pelican Project. Meeting the needs of children with asthma

    NARCIS (Netherlands)

    Bragt, S.T.W.M. van

    2015-01-01

    The thesis, called ‘Pelican Project: Meeting the Needs of Children with asthma’ describes the importance of including personal treatment goals of children in the care of asthma. Through a health-related quality of life questionnaire, called ‘the Pelican instrument’, the treatment goals for children

  2. 77 FR 37101 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-06-20

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  3. 77 FR 40411 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-07-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  4. 77 FR 21157 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-04-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  5. 77 FR 55525 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-09-10

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  6. Meeting the challenges of developing LED-based projection displays

    Science.gov (United States)

    Geißler, Enrico

    2006-04-01

    The main challenge in developing a LED-based projection system is to meet the brightness requirements of the market. Therefore a balanced combination of optical, electrical and thermal parameters must be reached to achieve these performance and cost targets. This paper describes the system design methodology for a digital micromirror display (DMD) based optical engine using LEDs as the light source, starting at the basic physical and geometrical parameters of the DMD and other optical elements through characterization of the LEDs to optimizing the system performance by determining optimal driving conditions. LEDs have a luminous flux density which is just at the threshold of acceptance in projection systems and thus only a fully optimized optical system with a matched set of LEDs can be used. This work resulted in two projection engines, one for a compact pocket projector and the other for a rear projection television, both of which are currently in commercialization.

  7. 76 FR 45004 - Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Volunteer Income Tax...

  8. 77 FR 67735 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2012-11-13

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  9. 78 FR 78516 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee.

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  10. 76 FR 45007 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  11. 78 FR 41193 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2013-07-09

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  12. 77 FR 47166 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-08-07

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, September 11, 2012, at 2 p.m. Eastern Time via...

  13. 76 FR 78342 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2011-12-16

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, January 10, 2012, at 2 p.m. Eastern Time via...

  14. 77 FR 2611 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-01-18

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, February 14, 2012, at 2 p.m. Eastern Time via...

  15. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-10-05

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, November 13, 2012, at 2:00 p.m. Eastern Time via...

  16. 77 FR 8328 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-02-14

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Panel Face-to-Face Service Methods Project Committee will be held Tuesday, March 13, 2012, at 2 p.m...

  17. 76 FR 22171 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-04-20

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  18. 76 FR 32024 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-02

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  19. 75 FR 33894 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-06-15

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  20. 76 FR 2197 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2011-01-12

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  1. 75 FR 7540 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-02-19

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  2. 76 FR 17995 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-03-31

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  3. 75 FR 18955 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2010-04-13

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  4. 75 FR 25316 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-05-07

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  5. New researchers for applied physics

    CERN Multimedia

    Rita Giuffredi, PicoSEC project

    2012-01-01

    On 12 September, thirteen PicoSEC researchers met in Lyon for the first time, at the project’s kick-off meeting. The meeting was the opportunity for them to get to know each other and start building a fruitful working and human relationship. A hard task awaits them: reaching the 200-picosecond-limit on time resolution in photon detectors.    The 13 researchers recruited for the PicoSEC project and the organizers of the project, September 2012. Photon detectors are used in many different fields ranging from high-energy physics calorimetry for the future generation of colliders to the photon time-of-flight technique for the next generation of PET scanners. Within the PicoSEC EU-funded Marie Curie Initial Training Network, 18 Early Stage Researchers and 4 Experienced Researchers are being trained to develop new detection techniques based on very fast scintillating crystals and photo detectors. In a multi-site project like PicoSEC, in which 11 institutes and companies from 6 ...

  6. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  7. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  8. 75 FR 39330 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  9. 75 FR 55404 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  10. Implementing Family Meetings Into a Respiratory Care Unit: A Care and Communication Quality Improvement Project.

    Science.gov (United States)

    Loeslie, Vicki; Abcejo, Ma Sunnimpha; Anderson, Claudia; Leibenguth, Emily; Mielke, Cathy; Rabatin, Jeffrey

    Substantial evidence in critical care literature identifies a lack of quality and quantity of communication between patients, families, and clinicians while in the intensive care unit. Barriers include time, multiple caregivers, communication skills, culture, language, stress, and optimal meeting space. For patients who are chronically critically ill, the need for a structured method of communication is paramount for discussion of goals of care. The objective of this quality improvement project was to identify barriers to communication, then develop, implement, and evaluate a process for semistructured family meetings in a 9-bed respiratory care unit. Using set dates and times, family meetings were offered to patients and families admitted to the respiratory care unit. Multiple avenues of communication were utilized to facilitate attendance. Utilizing evidence-based family meeting literature, a guide for family meetings was developed. Templates were developed for documentation of the family meeting in the electronic medical record. Multiple communication barriers were identified. Frequency of family meeting occurrence rose from 31% to 88%. Staff satisfaction with meeting frequency, meeting length, and discussion of congruent goals of care between patient/family and health care providers improved. Patient/family satisfaction with consistency of message between team members; understanding of medications, tests, and dismissal plan; and efficacy to address their concerns with the medical team improved. This quality improvement project was implemented to address the communication gap in the care of complex patients who require prolonged hospitalizations. By identifying this need, engaging stakeholders, and developing a family meeting plan to meet to address these needs, communication between all members of the patient's care team has improved.

  11. ECFA Meeting in May: LEP project changes / Backing for HERA / HEP in Europe

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The European Committee for Future Accelerators held a Plenary Meeting at CERN on 9 May. The representatives of the Universities and Laboratories in the CERN Member States heard presentations on the latest developments concerning the LEP project at CERN. They supported a recommendation on the HERA project at DESY and they endorsed a detailed report on high energy physics in Europe

  12. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  13. Presentation: Human and Ecological Health Impacts Associated with Water Reuse and Conservation Practices

    Science.gov (United States)

    This presentation was given by Dr. James Johnson at the STAR Human and Ecological Health Impacts Associated with Water Reuse and Conservation Practices Kick-off Meeting and Webinar held on Oct. 26-27, 2016.

  14. Report on the third meeting of the project advisory committee (technical) for IAEA/WHO Project EGY/6/004 (Egyptian Cancer Project) 27-29 April 1985, at NEMROCK, Cairo. PACT(3)

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1985-06-01

    The Project was launched in March 1983, with the first meeting of the Committee (PACT(I)). It was planned for a duration of four years. Now, after two years experience, PACT(III) met to review results so far and to advise on actions for the remaining two years. Appendix 1 lists those present at the meeting. Since 1983 a Pilot Project has been running at NEMROCK, the Nuclear Medicine and Radiation Oncology Centre at Cairo University Hospital, at which the Project is based. Two training courses have been given, in November 1983 and November 1984, and treatment has been given using protocols developed under the project. PACT(III) examined clinical results obtained so far and made recommendations for the extension of the scheme to other hospitals in Egypt

  15. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  16. Practical tips for dealing with office construction and repair.

    Science.gov (United States)

    Hills, Laura Sachs

    2008-01-01

    Many medical practices embark on a large office construction project sooner or later. When they do, the medical practice staff often finds itself up to its eyeballs in dust, debris, and confusion. This article suggests practical strategies for the medical practice staff to help employees cope with the inevitable challenges before, during, and after an office construction project. It suggests a strategy for a staff kick-off meeting and for establishing staff to-do lists throughout the project. It offers 10 practical staff strategies before the project begins including doing preparatory work with patients and neighbors and establishing a chain of communication. The article also offers tips for ensuring safety during office construction and ways to use a construction project as a springboard for goodwill-building and practice-marketing activities. Finally, this article offers advice about maintaining the daily schedule of the practice during a large-scale office construction project.

  17. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  18. 77 FR 30591 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-05-23

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face [[Page 30592... meeting will be held Thursday, June 7 from 8:00 a.m.-5:00 p.m. Eastern Time and Friday, June 8 from 8:00 a...

  19. Presentation: Overview of Water Reuse Challenges and Opportunities

    Science.gov (United States)

    This presentation, Overview of Water Reuse Challenges and Opportunities, was given at the STAR Human and Ecological Health Impacts Associated with Water Reuse and Conservation Practices Kick-off Meeting and Webinar held on Oct. 26-27, 2016.

  20. 75 FR 11169 - Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12713-002] Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and Environmental Site...: Reedsport OPT Wave Park, LLC. e. Name of Project: Reedsport OPT Wave Park Project. [[Page 11170

  1. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  2. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby...

  3. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and...

  4. Meetings and Meeting Modeling in Smart Environments

    NARCIS (Netherlands)

    Nijholt, Antinus; op den Akker, Hendrikus J.A.; Heylen, Dirk K.J.

    In this paper we survey our research on smart meeting rooms and its relevance for augmented reality meeting support and virtual reality generation of meetings in real time or off-line. The research reported here forms part of the European 5th and 6th framework programme projects multi-modal meeting

  5. Private sector malaria RDT initiative in Nigeria: lessons from an end-of-project stakeholder engagement meeting.

    Science.gov (United States)

    Odugbemi, Babatunde; Ezeudu, Chijioke; Ekanem, Anyiekere; Kolawole, Maxwell; Akanmu, Idowu; Olawole, Aderemi; Nglass, Nkabono; Nze, Chinwe; Idenu, Edward; Audu, Bala Mohammed; Ntadom, Godwin; Alemu, Wondimagegnehu; Mpazanje, Rex; Cunningham, Jane; Akubue, Augustine; Arowolo, Tolu; Babatunde, Seye

    2018-02-06

    The malaria rapid diagnosis testing (RDT) landscape is rapidly evolving in health care delivery in Nigeria with many stakeholders playing or having potential for critical roles. A recent UNITAID grant supported a pilot project on the deployment of quality-assured RDTs among formal and informal private service outlets in three states in Nigeria. This paper describes findings from a series of stakeholder engagement meetings held at the conclusion of the project. The agreed meeting structure was a combination of plenary presentations, structured facilitated discussions, and nominal group techniques to achieve consensus. Rapporteurs recorded the meeting proceeding and summaries of the major areas of discussion and consensus points through a retrospective thematic analysis of the submitted meeting reports. Key findings indicate that private providers were confident in the use of RDTs for malaria diagnosis and believed it has improved the quality of their services. However, concerns were raised about continued access to quality-assured RDT kits. Going forward, stakeholders recommended increasing client-driven demand, and continuous training and supervision of providers through integration with existing monitoring and supervision mechanisms.

  6. Costa Rica regroups for sales kick-off.

    Science.gov (United States)

    1985-01-01

    Cost Rica's contraceptive social marketing project is scheduled to be launched in March 1985. The project is run through a for-profit corporation, Asdecosta, which is owned by the Costa Rican International Planned Parenthood affiliate. Asdecosta was formed as a for-profit entity because Costa Rican law prohibits product sales by nonprofit groups. The US Agency for International Development (AID) will allocate US$1.2 million over a 5-year period, 1983-88. The project manager, Jorge Lopez, is an economist with considerable experience in marketing. The project has lined up a top national distributor, a packaging company, and an advertising agency for its 1st product, a condom manufactured in the US by Ansell. Asdecost's target market is projected to include 50,000-75,000 couples at its peak operating capacity. An estimated 65% of Costa Rican women have used a contraceptive method at some time. The condom, pill, and IUD are the most popular methods. Eventually, Asdecosta expects to expand its product line to include oral contraceptives. Another goal is to counter the high drop out rate among users of government and other family planning services.

  7. The European Nuclear Science network touches base at CERN

    CERN Multimedia

    Antonella Del Rosso

    2012-01-01

    ENSAR (European Nuclear Science and Applications Research) is an EU-supported project, which aims at fostering cooperation within the European low-energy nuclear physics community through the active sharing of expertise and best practices. The project also includes a transnational access programme to allow a large community of users to access the participating facilities, which include CERN’s ISOLDE. In the last week of April, CERN hosted the General Assembly and Programme Coordination Committee meetings, about 18 months after the project’s kick-off.   Participants in the ENSAR project. ENSAR involves 30 partner institutes, which include the seven large nuclear physics facilities in Europe. A large part of the European nuclear physics community is represented in ENSAR, in particular scientists who are performing research related to nuclear structure, nuclear astrophysics and applications of nuclear science. In 2010, the project was awarded 8 million euros from the Europe...

  8. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    Science.gov (United States)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  9. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  10. Closing speech

    NARCIS (Netherlands)

    Mengelers, J.H.J.

    2015-01-01

    HTSC Kick-Off Symposium. In order to meet today’s societal challenges, there is a strong demand for a breakthrough in technological and social innovation. HTSC is the university's response to the increasing demand from industry for fundamental research and development in the area of high-tech

  11. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction

  12. 14. Annual meeting of the European Society of Radiobiology and the symposium of the European Late Effects Project Group

    International Nuclear Information System (INIS)

    Charles, M.W.

    1979-03-01

    In October 1978 the Fourteenth Annual Meeting of the European Society of Radiation Biology (ESRB) and a symposium of the European Late Effects Project Group (EULEP) were held consecutively at the Kernforchungsanlage (KFA), Julich, FDR. The EULEP meeting was convened to specifically discuss the biological basis of the recommendations of publication 26 of the International Commission on Radiological Protection (ICRP). The programme of the ESRB Meeting also reflected the present interest in radiological protection. A short summary of these meetings is presented. Details of the two meetings are given in appendices which should form an introduction to, and resume of, recent developments in this field. (author)

  13. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  14. Fourth natural analogue working group meeting and Pocos de Caldas project final workshop

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1991-01-01

    The fourth meeting of the CEC-sponsored natural analogue working group (NAWG) was held in Pitlochry, Scotland, from 18 to 22 June 1990, and also included the final workshop of the Pocos de Caldas (Brazil) natural analogue project, sponsored by Nagra (CH), SKB (S) UK-DOE and US-DOE. About 80 specialists attended this meeting, originating from EC Member States and also Australia, Brazil, Canada, Finland, Japan, Sweden, Switzerland and the USA. The IAEA and OCDE-NEA were also represented. This plenary meeting was the opportunity to review and discuss five years of progress and activities of natural analogues in central areas of performance assessment: waste forms and engineered barriers, geochemistry and radionuclide speciation, radionuclide migration and the overall geological context of radwaste disposal. In addition, a feedback session provided the opportunity for regulators and those individuals who had advisory roles to give their views and impressions on the significance of natural analogue research. These proceedings, divided into two sessions, contain 32 technical papers and 14 abstracts of published papers

  15. New researchers join HIE-ISOLDE

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    The HIE-ISOLDE team is expecting a few new faces around the lab, as the new EU-funded project CATHI (Cryogenics, Accelerators and Targets for HIE-ISOLDE) gets into full swing as part of the Seventh Framework Programme. The project will recruit researchers from around the world to be trained at CERN and will hold its kick-off meeting here on 23 May.   CATHI is a 4-year Marie Curie-funded Initial Training Network aimed at preparing researchers in the application of advanced accelerator technology. The €4.97 million initiative provides support for 20 researchers: 16 Early Stage Researchers and 4 Experienced Researchers (positions are similar to CERN’s junior and senior fellowships). The main objective of the CATHI project is to give researchers the highest level of specialist training. Researchers will develop expert, technical R&D skills by working on HIE-ISOLDE, the ongoing upgrade of the ISOLDE facility, one of Europe’s leading radioactive ion beam facilities. In...

  16. 75 FR 13134 - Notice of Meeting

    Science.gov (United States)

    2010-03-18

    ...)(6). Grant applications for the Medical Liability and Safety Innovation Projects (R21) applications... disclosure under the above- cited statutes. SEP Meeting on: Medical Liability and Safety Innovation Projects... meeting) Place: Doubletree Bethesda Hotel & Executive Meeting Center, 8120 Wisconsin Avenue, Conference...

  17. An FP7 "Space" project: Aphorism "Advanced PRocedures for volcanic and Seismic Monitoring"

    Science.gov (United States)

    Di Iorio, A., Sr.; Stramondo, S.; Bignami, C.; Corradini, S.; Merucci, L.

    2014-12-01

    program and the Kick-Off meeting has been held at INGV premises in Rome on 18th December 2013.

  18. Remedial action programs annual meeting: Meeting notes

    International Nuclear Information System (INIS)

    1987-01-01

    The US Department of Energy Grand Junction Projects Office was pleased to host the 1987 Remedial Action programs Annual Meeting and herein presents notes from that meeting as prepared (on relatively short notice) by participants. These notes are a summary of the information derived from the workshops, case studies, and ad hoc committee reports rather than formal proceedings. The order of the materials in this report follows the actual sequence of presentations during the annual meeting

  19. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  20. Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, R.R.

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.

  1. Effects of the Meetings-Flow Approach on Quality Teamwork in the Training of Software Capstone Projects

    Science.gov (United States)

    Chen, Chung-Yang; Hong, Ya-Chun; Chen, Pei-Chi

    2014-01-01

    Software development relies heavily on teamwork; determining how to streamline this collaborative development is an essential training subject in computer and software engineering education. A team process known as the meetings-flow (MF) approach has recently been introduced in software capstone projects in engineering programs at various…

  2. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  3. Bi-Axial Solar Array Drive Mechanism: Design, Build and Environmental Testing

    Science.gov (United States)

    Scheidegger, Noemy; Ferris, Mark; Phillips, Nigel

    2014-01-01

    The development of the Bi-Axial Solar Array Drive Mechanism (BSADM) presented in this paper is a demonstration of SSTL's unique space manufacturing approach that enables performing rapid development cycles for cost-effective products that meet ever-challenging mission requirements: The BSADM is designed to orient a solar array wing towards the sun, using its first rotation axis to track the sun, and its second rotation axis to compensate for the satellite orbit and attitude changes needed for a successful payload operation. The tight development schedule, with manufacture of 7 Flight Models within 1.5 year after kick-off, is offset by the risk-reduction of using qualified key component-families from other proven SSTL mechanisms. This allowed focusing the BSADM design activities on the mechanism features that are unique to the BSADM, and having an Engineering Qualification Model (EQM) built 8 months after kick-off. The EQM is currently undergoing a full environmental qualification test campaign. This paper presents the BSADM design approach that enabled meeting such a challenging schedule, its design particularities, and the ongoing verification activities.

  4. Fifth Single-Shell Tank Integrity Project Expert Panel Meeting August 28-29, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Todd M. [Washington River Protection Solutions, LLC, Richland, WA (United States; Gunter, Jason R. [Washington River Protection Solutions, LLC, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, LLC, Richland, WA (United States)

    2015-01-07

    On August 28th and 29th, 2014 the Single-Shell Tank Integrity Project (SSTIP) Expert Panel (Panel) convened in Richland, Washington. This was the Panel’s first meeting since 2011 and, as a result, was focused primarily on updating the Panel on progress in response to the past recommendations (Single-Shell Tank Integrity Expert Panel Report, RPP-RPT-45921, Rev 0, May 2010). This letter documents the Panel’s discussions and feedback on Phase I activities and results.

  5. PACMAN – an Innovative Doctoral Programme for CLIC

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    The final network project funded under the European Commission’s Seventh Framework Programme (FP7), Marie Curie Actions, held its kick-off meeting at CERN on 20 November 2013.   PACMAN – a study on Particle Accelerator Components Metrology and Alignment to the Nanometre scale – is in the final stage of recruiting 10 PhD students to do research on beam instrumentation, metrology, micrometric alignment, magnetic measurements, nano-positioning and high-precision engineering. The students will acquire multi-disciplinary expertise in advanced engineering combined with a broad span of transferable skills. “PACMAN gives us the opportunity to attract students to CERN at a key moment in the CLIC study,” said Frédérick Bordry, Head of CERN’s Technology Department. “This is also an ideal opportunity to further develop CERN’s networks with industry and universities.” “The project is...

  6. Report of the 52. meeting of the Superior Council of the Nuclear Safety and Information (project)

    International Nuclear Information System (INIS)

    2000-01-01

    Since june 2000, the CSSIN (Superior Council on Nuclear Safety and Information) decided to present the meeting of its sessions, on the Internet site of the Nuclear Safety Authority. This document is the meeting project concerning the session of the 27 june 2000. The following subjects have been treated: the Blayais accident and its consequences; the Euratom Directive transposition on the workers and people protection; methodology and organization of the CSSIN concerning the civil nuclear installations and the radiation protection; actualization of the CSSIN heading in the Internet site of the Nuclear Safety Authority. (A.L.B.)

  7. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  8. Annotating and measuring meeting behavior

    NARCIS (Netherlands)

    van Dijk, Elisabeth M.A.G.; Nijholt, Antinus; Heylen, Dirk K.J.; Noldus, L.P.J.J.; Grieco, F; Loijens, L.W.S.; Zimmerman, P.H.

    2005-01-01

    Within the AMI (Augmented Multi-party Interaction) project technologies will be developed that can facilitate human interaction in the context of instrumented meeting rooms, which includes remote participant support and the possibility to browse through past meetings. The project collects data on

  9. E-Infrastructure Concertation Meeting

    CERN Multimedia

    Katarina Anthony

    2010-01-01

    The 8th e-Infrastructure Concertation Meeting was held in the Globe from 4 to 5 November to discuss the development of Europe’s distributed computing and storage resources.   Project leaders attend the E-Concertation Meeting at the Globe on 5 November 2010. © Corentin Chevalier E-Infrastructures have become an indispensable tool for scientific research, linking researchers to virtually unlimited e-resources like the grid. The recent e-Infrastructure Concertation Meeting brought together e-Science project leaders to discuss the development of this tool in the European context. The meeting was part of an ongoing initiative to develop a world-class e-infrastructure resource that would establish European leadership in e-Science. The e-Infrastructure Concertation Meeting was organised by the Commission Services (EC) with the support of e-ScienceTalk. “The Concertation meeting at CERN has been a great opportunity for e-ScienceTalk to meet many of the 38 new proje...

  10. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  11. Project BudBurst - Meeting the Needs of Climate Change Educators and Scientists

    Science.gov (United States)

    Henderson, S.

    2015-12-01

    It is challenging for many to get a sense of what climate change means as long periods of time are involved - like decades - which can be difficult to grasp. However, there are a number of citizen science based projects, including NEON's Project BudBurst, that provide the opportunity for both learning about climate change and advancing scientific knowledge. In this presentation, we will share lessons learned from Project BudBurst. Project BudBurst is a national citizen science initiative designed to engage the public in observations of phenological (plant life cycle) events and to increase climate literacy. Project BudBurst is important from an educational perspective, but also because it enables scientists to broaden the geographic and temporal scale of their observations. The goals of Project BudBurst are to 1) increase awareness of phenology as an area of scientific study; 2) Increase awareness of the impacts of changing climates on plants at a continental-scale; and 3) increase science literacy by engaging participants in the scientific process. It was important to better understand if and how Project BudBurst is meeting its goals. Specifically, does participation by non-experts advance scientific knowledge? Does participation advance educational goals and outcomes? Is participation an effective approach to advance/enhance science education in both formal and informal settings? Critical examination of Project BudBurst supports advancement of scientific knowledge and realization of educational objectives. Citizen science collected observations and measurements are being used by scientists as evidenced by the increase of such data in scientific publication. In addition, we found that there is a significant increase in educators utilizing citizen science as part of their instruction. Part of this increase is due to the resources and professional development materials available to educators. Working with partners also demonstrated that the needs of both science and

  12. Patient-centered family meetings in palliative care: a quality improvement project to explore a new model of family meetings with patients and families at the end of life.

    Science.gov (United States)

    Sanderson, Christine R; Cahill, Philippa J; Phillips, Jane L; Johnson, Anne; Lobb, Elizabeth A

    2017-12-01

    Family meetings in palliative care can enhance communication with family members and identify unmet needs. However, the patient's voice may not be heard. This pre and post-test quality improvement project was conducted from 2013-2014 and investigated a patient-centered family meeting, which is a different approach to palliative care family meetings, to determine its feasibility and acceptability for patients, family and the palliative care team. Newly admitted patients to an Australian in-patient specialist palliative care unit were invited to ask anyone they wished to join them in a meeting with the palliative care team and to identify issues they wished to discuss. Consenting inpatients were interviewed shortly after admission; participated in a family meeting and re-interviewed 2-3 days after the meeting. Family members provided feedback at the end of the meeting. A focus group was held with staff for feedback on this new approach for family meetings. Meetings were observed, documented and thematically analyzed. Thirty-one newly admitted patients were approached to participate in a family meeting. Eighty-four percent had family meetings and the majority (96%) was attended by the patient. Thematic analysis revealed 69% of patient-centered meetings raised end-of-life concerns and 54% were "family-focused". Patient-centered family meetings in palliative care were shown to be feasible and acceptable for staff, patients and family members. Many patients and families spontaneously shared end-of-life concerns. A patient-centered approach to family meetings that includes active patient involvement may provide additional and valued opportunities for patients and families to: express mutual concerns, deliver messages of comfort and appreciation, and prepare for death. Further investigation of this approach, including families' bereavement outcomes, is warranted.

  13. Report on the second meeting of the project advisory committee (technical) for IAEA/WHO project EGY/6/004 (Egyptian Cancer Project) 3-9 April 1984, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.G.B.

    1984-07-01

    The purpose of the meeting was to review the first year's work and make recommendations for the future. The Committee dealt mainly with the Training Course, the selection of cases suitable for treatment by simple means, the revision of treatment notes and protocols, planning for the cytology (early diagnosis) programme, the collection and manipulation of data, the extension of the Project in Egypt, and its possible extension to other countries

  14. AIDA – pushing the boundaries of European particle detector research

    CERN Multimedia

    Naomi Gilraen Wyles

    2011-01-01

    AIDA (Advanced European Infrastructures for Detectors at Accelerators), a new project co-funded by the European Union and worth a total of 26 million euros, will be officially launched at CERN next week. The kick-off meeting will take place on 16-18 February, during which Europe-wide detector physicists will come together to begin work on detector infrastructure developments for future particle physics experiments.   Coordinated by CERN, AIDA involves more than 80 institutes and laboratories from 23 countries as beneficiaries or associate partners (the full list can be found here). This four-year project will receive 8 million euros from the European Commission's FP7 Research Infrastructures programme. AIDA will develop facilities covering the four main goals identified by the European Strategy for Particle Physics. These are the LHC upgrade, Linear Colliders, Neutrino facilities and Super-B factories. These facilities will also be available for other researchers in the fields of nuclear and par...

  15. NEDO information dissemination subcommittee. 18th project report meeting; NEDO joho fukyu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Explained in detail in a report on NEDO (New Energy and Industrial Technology Development Organization) information center activities is the exchange of information, which is accomplished through IEA (International Energy Agency) Energy Technology Data Exchange (ETDE) implementing agreement; IEA Coal Research implementing agreement; Center for the Analysis and Dissemination of Demonstrated Energy Technologies (CADDET); and IEA Greenhouse Gas Technology Information Exchange (GREENTIE). Described in relation with information dissemination activities are the opening to the public of NEDO achievement reports, NEDO Energy Database System (NEDO-EDBS), management of the library and data room, information available at Internet web sites, and so forth. Other project reports presented at the meeting include a survey of new energy actualities, publication of dedicated information journals, and so forth. At the second session of the project report meeting, a lecture is delivered, entitled Network Age and Information Distribution Revolution. (NEDO)

  16. Third ITER International Industry Liaison Meeting

    International Nuclear Information System (INIS)

    Dautovich, D.

    2000-01-01

    Following previous meetings held in 1996 in San Diego and in 1997 in Tokyo, the Third ITER International Industry Liaison Meeting (IILM) meeting was held under the European Chairmanship in Toronto, Canada, November 7-9, 2000. The intention of such meetings is to provide a forum for industrialists of the ITER EDA parties and other interested countries to develop common understandings on important issues of the timing and nature of Industry involvement in the ITER project. This article describes the main views from Industry on the preconstruction and construction phases and the cost and benefit schemes, while summarizing the progress made by the ITER project since the Tokyo meeting

  17. EuroCirCol: A key to New Physics

    CERN Multimedia

    Johannes Gutleber

    2015-01-01

    Monday 1 June saw the start of EuroCirCol, the EC-funded part of the FCC study that will develop the conceptual design for an energy-frontier hadron collider.   Attendees at the EuroCirCol meeting at CERN. The EuroCirCol kick-off event at CERN on 2 to 4 June brought together 62 participants to constitute governance bodies, commit to the project plan and align the organisation, structures and processes of 16 institutions from 10 countries. The goal of the project is to conceive a post-LHC research infrastructure around a 100 km circular energy-frontier hadron collider capable of reaching 100 TeV collisions. The project officially started on 1 June and will run for four years. The total estimated budget of 11.2 MEUR includes a 2.99 MEUR contribution from the Horizon 2020 programme dedicated to the development of new world-class research infrastructures. EuroCirCol will deliver a design for a hadron collider as part of the broader Future Circular Collider (FCC) study. It will provide input to an...

  18. Notification of upcoming AGU Council meeting

    Science.gov (United States)

    Williams, Billy

    2012-10-01

    The AGU Council will meet on Sunday, 2 December 2012, at the InterContinental Hotel in San Francisco, Calif. The meeting, which is open to all AGU members, will include discussions of AGU's new Grand Challenge Project (a project that will be introduced to members at the 2012 Fall Meeting), the proposed AGU scientific ethics policy, publishing strategies, future plans for honors and recognition, and leadership transition as new members join the Council. This year the Council experimented with a new approach to conducting business. By holding virtual meetings throughout the year, Council members have been able to act in a more timely manner and provide input on important membership and science issues on the Board of Directors' agenda. The Council Leadership Team—an elected subset of the Council—also experimented with a new approach, meeting every month to keep moving projects forward. This approach has increased communication and improved effectiveness in Council decision making.

  19. Don't miss the Announcements and Events sections of the Bulletin!

    CERN Multimedia

    2014-01-01

    There you'll find information on Safety Training and the team in charge, the OHS-0-0-3 Safety Form, the posters of the 2013 Nobel Prize in Physics, the 2014 CERN Accelerator Schools, the 2014 European School of High-Energy Physics, the Future Circular Collider (FCC) study kick-off meeting, Ugo Amaldi’s public talk on 11 February, the Lift Conference... this information is FOR YOU!

  20. African refugee and immigrant health needs: report from a community-based house meeting project.

    Science.gov (United States)

    Boise, Linda; Tuepker, Anais; Gipson, Teresa; Vigmenon, Yves; Soule, Isabelle; Onadeko, Sade

    2013-01-01

    As in other communities in the United States, information is lacking about the health needs of Africans refugees and immigrants living in Portland, Oregon. In 2008, the African Partnership for Health coalition (APH) was formed to carry out research, advocacy and education to improve the health and well-being of Africans in Oregon. This was APH's initial project. The purposes of this study were to gather data about the perceived health needs and barriers to health care Africans encounter, and lay the foundation for a program of action to guide APH's future work. Community-based participatory research (CBPR) methods were used to collect data on how to improve the health of the African community in the Portland area and define an agenda for future projects. Popular education principles guided the engagement and training of African community members, who conducted nine house meetings with 56 Africans from 14 countries. The results were analyzed by African community members and researchers and prioritized at a community meeting. Three themes emerged: The stressfulness of life in America, the challenges of gaining access to health care, and the pervasive feelings of disrespect and lack of understanding of Africans' health needs, culture, and life experiences by health providers and staff members. Using CBPR methods, we identified and prioritized the needs of the African community. This information provides a framework for future work of the African Partnership for Health and other service and advocacy groups.

  1. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    Science.gov (United States)

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  2. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  3. 17th Business Report Meeting of New Energy Industrial Technology Development Organization (NEDO). Section Meeting on International Cooperation Projects; Dai 17 kai jigyo hokokukai. Kokusai kyoryoku jigyo bunkakai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    In this section meeting, reports were made on the following themes: 1) pregrinder model project; 2) power recovery model project; 3) energy conservation model project and the importance of the spread. In 1), this model project aims to demonstrate that the electric power unit requirement for cement production can be reduced by installing a pregrinder at the front step of ball mill as the finish process at a cement factory in Indonesia, increasing capacity of ball mill grinding, and reducing operational loads of the ball mill which is large in power consumption. In 2), this project aims to supply China a technology to recover power from high temperature/high pressure exhaust gas via gas expander as electric power of 5.8MW after separating FCC catalyst associated with from the exhaust gas from the generative tower of fluid catalytic cracking equipment for oil refining. To come up to expectations for Japan from neighboring countries in Asia, NEDO Information Center carried out the energy conservation model project, etc. as the international cooperation related project in the energy/environment field. The center is now developing 10 projects. (NEDO)

  4. 75 FR 13135 - Notice of Meeting

    Science.gov (United States)

    2010-03-18

    ...). Grant applications for the Medical Liability and Safety Demonstration Projects (R18) applications are to... disclosure under the above-cited statutes. SEP Meeting on: Medical Liability and Safety Demonstration... remainder of the meeting). Place: Doubletree Bethesda Hotel & Executive Meeting Center, 8120 Wisconsin...

  5. Report of the first meeting of the Project Advisory Committee (Technical) 21-24 March 1983, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1983-05-01

    The Project Advisory Committee (Technical) (PACT) met on 21-24 March 1983, at NEMROCK, Cairo, Egypt, to discuss the joint IAEA/WHO project on Intracavitary Radiation Therapy for Cancer of the Uterus (Egypt/6/004). At this four day meeting the committee (1) identified a well-defined administrative framework in which earlier diagnosis of uterine cancer may be organized, on a limited but firm basis. (2) Agreed on the clinical and dosimetric principles to be followed in implementing the project. (3) Decided on the types and quantities of equipment which it will need in its first two years. (4) Developed the outline of the syllabus for the first training course, and fixed its date (three weeks from 83-10-29). (5) Reviewed the costs which will be incurred in carrying through the project and found them to be consistent with the funds available

  6. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  7. Towards the petaflop for Lattice QCD simulations the PetaQCD project

    International Nuclear Information System (INIS)

    D'Auriac, Jean-Christian Angles; Carbonell, Jaume; Barthou, Denis

    2010-01-01

    The study and design of a very ambitious petaflop cluster exclusively dedicated to Lattice QCD simulations started in early '08 among a consortium of 7 laboratories (IN2P3, CNRS, INRIA, CEA) and 2 SMEs. This consortium received a grant from the French ANR agency in July '08, and the PetaQCD project kickoff took place in January '09. Building upon several years of fruitful collaborative studies in this area, the aim of this project is to demonstrate that the simulation of a 256 x 128 3 lattice can be achieved through the HMC/ETMC software, using a machine with efficient speed/cost/reliability/power consumption ratios. It is expected that this machine can be built out of a rather limited number of processors (e.g. between 1000 and 4000), although capable of a sustained petaflop CPU performance. The proof-of-concept should be a mock-up cluster built as much as possible with off-the-shelf components, and 2 particularly attractive axis will be mainly investigated, in addition to fast all-purpose multi-core processors: the use of the new brand of IBM-Cell processors (with on-chip accelerators) and the very recent Nvidia GP-GPUs (off-chip co-processors). This cluster will obviously be massively parallel, and heterogeneous. Communication issues between processors, implied by the Physics of the simulation and the lattice partitioning, will certainly be a major key to the project.

  8. Laboratory interface in support of Environmental Restoration Programs

    International Nuclear Information System (INIS)

    Pardue, G.J. Jr.

    1994-01-01

    A vital part of quality environmental data resides in the communication between the project and the analytical laboratory. It is essential that the project clearly identify its objectives to the laboratory and that the laboratory understands the scope and limitations of the analytical process. Successful completion of an environmental project must include an aggressive program between project managers and subcontracted Lyrical laboratories. All to often, individuals and organizations tend to deflect errors and failures observed in environmental toward open-quotes the other guyclose quotes. The engineering firm will blame the laboratory, the laboratory will blame the field operation, the field operation will blame the engineering, and everyone will blame the customer for not understanding the true variables in the environmental arena. It is the contention of the authors, that the majority of failures derive from a lack of communication and misunderstanding. Several initiatives can be taken to improve communication and understanding between the various pieces of the environmental data quality puzzle. This presentation attempts to outline mechanisms to improve communication between the environmental project and the analytical laboratory with the intent of continuous quality improvement. Concepts include: project specific laboratory statements of work which focus on project and program requirements; project specific analytical laboratory readiness reviews (project kick-off meetings); laboratory team workshops; project/program performance tracking and self assessment and promotion of team success

  9. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  10. 24 CFR 245.120 - Meeting space.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Meeting space. 245.120 Section 245... PARTICIPATION IN MULTIFAMILY HOUSING PROJECTS Tenant Organizations § 245.120 Meeting space. (a) Owners of... of any community room or other available space appropriate for meetings that is part of the...

  11. NEDO business outline for fiscal 1997. 18th project report meeting; 1997 nendo gyomu gaiyo. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-22

    The projects of NEDO (New Energy and Industrial Technology Development Organization) are stated as reported at the 18th project report meeting. Outlined are new energy-related projects involving technology development, resources exploitation, promotion of new energy introduction, promotion of international cooperation, gathering of information, and so on. Outlined in relation to the research and development of industrial technologies are projects on research and development, development of medical and welfare equipment, research and development of global environment-related industrial technology, development of international industrial technology, and improvement on platforms for researches. Concerning coal, subsidy-granted projects on domestic coal and projects on domestic coal mine improvement are outlined. Projects relating to compensation for environmental pollution resulting from coal mining and those relating to alcohol production are also outlined. NEDO's financial statement for fiscal 1997 is reported. Also reported are budgets for fiscal 1998 for projects relating to new energy, research and development of industrial technology, coal mining structure coordination, compensation for environmental pollution resulting from coal mining, and alcohol production. (NEDO)

  12. NEDO business outline for fiscal 1997. 18th project report meeting; 1997 nendo gyomu gaiyo. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-22

    The projects of NEDO (New Energy and Industrial Technology Development Organization) are stated as reported at the 18th project report meeting. Outlined are new energy-related projects involving technology development, resources exploitation, promotion of new energy introduction, promotion of international cooperation, gathering of information, and so on. Outlined in relation to the research and development of industrial technologies are projects on research and development, development of medical and welfare equipment, research and development of global environment-related industrial technology, development of international industrial technology, and improvement on platforms for researches. Concerning coal, subsidy-granted projects on domestic coal and projects on domestic coal mine improvement are outlined. Projects relating to compensation for environmental pollution resulting from coal mining and those relating to alcohol production are also outlined. NEDO's financial statement for fiscal 1997 is reported. Also reported are budgets for fiscal 1998 for projects relating to new energy, research and development of industrial technology, coal mining structure coordination, compensation for environmental pollution resulting from coal mining, and alcohol production. (NEDO)

  13. Instrument validation project

    International Nuclear Information System (INIS)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells

  14. Caribbean alternative energy programme project proposals

    International Nuclear Information System (INIS)

    1978-03-01

    This is the third report to follow the Project Group Meeting on ALTERNATIVE ENERGY RESOURCES, Barbados, September, 1977. It consists of summaries of projects proposals identified at the Meeting. The first two reports have been previously circulated. The first CSC(77)AER-1 covers the background, proceedings and recommendations resulting from the meeting as well as containing a brief outline of the project proposals. The country papers and technical papers that were presented at the meeting or served as background material, form the second report, CSC(77)AER-2. Copies of the first two reports can be obtained on request to the Commonwealth Science Council. Projects with potential for making significant progress in the short term have been marked with an asterisk

  15. First Meeting with Teachers and Principals of Unesco Associated Schools Project Held on Monday, 6 September 1982 at the Training Division, Prime Minister's Office, Castries, Saint Lucia.

    Science.gov (United States)

    International Understanding at School, 1982

    1982-01-01

    In September 1982, K-12 teachers and principals participating in Unesco's Associated Schools Project met to make preparations for the implementation of the project that was to commence when schools opened later that month. The project is intended to promote international understanding and peace. What happened at the meeting is described. (RM)

  16. Eleventh ITER negotiations meeting (N-11) and twelfth negotiators' standing sub-group meeting (NSSG-12)

    International Nuclear Information System (INIS)

    Luo Delong

    2005-01-01

    The Eleventh ITER Negotiations Meeting (N-11) and the Twelfth Negotiators' Standing Sub-Group (NSSG-12 convened on October 19-25, 2005 at the Kempinski Hotel Chengdu, Sichuan Province. China was the host of this meeting. Delegations from China, the European Union, Japan, the Republic of Korea, the Russian Federation and the United States of America, as well as members from the International Team, met there to continue their work to reach agreement on the joint implementation of the ITER international fusion energy R and D project. The delegations accepted the Vice Minister of Science and Technology, Mr. LIU Yanhua, and State Councillor, Mr. SHI Dinghuan as Moderators for N-11 and NSSG-12, respectively, and Mr. LUO Delong as Secretary for both meetings. At the Meeting, delegates discussed and made substantial progress on a full range of legal, technical, and administrative topics, including staffing for ITER, policies for managing the project and its procurements, and the continuing joint drafting of the agreement on establishing the international ITER Organization to implement the project. Delegates also explored the possibility of India joining the Negotiations. In the light of the reports presented to the Meeting from the recent joint exploratory mission to India, delegates identified a series of steps for the near future leading towards a possible agreement among all the Parties to India's accession. The Negotiations Meeting also discussed the progress report of NSSG and forward planning and future tasks. The Negotiators agreed that substantial progress was made on all topics, and delegations are optimistic that the Joint Implementation Agreement and related Annexes and instruments could be initialed in spring of 2006. As decided by all delegations, the next Twelfth ITER Negotiations Meeting will be held in Korea on 6 December, 2005

  17. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  18. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  19. ARTIST: An International Project Investigating Aerosol Retention in a Ruptured Steam Generator

    International Nuclear Information System (INIS)

    Guentay, S.; Dehbi, A.; Suckow, D.; Birchley, J.

    2002-01-01

    conditions, 5) Aerosol retention in the bundle section under wet conditions, 6) Droplet retention in separator and dryer sections and 7) Integral tests to examine overall retention in the SG unit. The project will investigate phenomena at the separate effect and integral levels, and will also address selected accident management (AM) issues. The kick-off experiments are scheduled for the first half of 2002, and some early results will be summarized at the meeting. (authors)

  20. 76 FR 51938 - Southwest Mississippi Resource Advisory Committee; Meeting

    Science.gov (United States)

    2011-08-19

    ... Resource Advisory Committee will meet in Meadville, MS. The committee is authorized under the Secure Rural... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... review and select proposed projects. DATES: The meeting will be held September 15, 2011, 6:00 p.m...

  1. Meet-U: Educating through research immersion.

    Science.gov (United States)

    Abdollahi, Nika; Albani, Alexandre; Anthony, Eric; Baud, Agnes; Cardon, Mélissa; Clerc, Robert; Czernecki, Dariusz; Conte, Romain; David, Laurent; Delaune, Agathe; Djerroud, Samia; Fourgoux, Pauline; Guiglielmoni, Nadège; Laurentie, Jeanne; Lehmann, Nathalie; Lochard, Camille; Montagne, Rémi; Myrodia, Vasiliki; Opuu, Vaitea; Parey, Elise; Polit, Lélia; Privé, Sylvain; Quignot, Chloé; Ruiz-Cuevas, Maria; Sissoko, Mariam; Sompairac, Nicolas; Vallerix, Audrey; Verrecchia, Violaine; Delarue, Marc; Guérois, Raphael; Ponty, Yann; Sacquin-Mora, Sophie; Carbone, Alessandra; Froidevaux, Christine; Le Crom, Stéphane; Lespinet, Olivier; Weigt, Martin; Abboud, Samer; Bernardes, Juliana; Bouvier, Guillaume; Dequeker, Chloé; Ferré, Arnaud; Fuchs, Patrick; Lelandais, Gaëlle; Poulain, Pierre; Richard, Hugues; Schweke, Hugo; Laine, Elodie; Lopes, Anne

    2018-03-01

    We present a new educational initiative called Meet-U that aims to train students for collaborative work in computational biology and to bridge the gap between education and research. Meet-U mimics the setup of collaborative research projects and takes advantage of the most popular tools for collaborative work and of cloud computing. Students are grouped in teams of 4-5 people and have to realize a project from A to Z that answers a challenging question in biology. Meet-U promotes "coopetition," as the students collaborate within and across the teams and are also in competition with each other to develop the best final product. Meet-U fosters interactions between different actors of education and research through the organization of a meeting day, open to everyone, where the students present their work to a jury of researchers and jury members give research seminars. This very unique combination of education and research is strongly motivating for the students and provides a formidable opportunity for a scientific community to unite and increase its visibility. We report on our experience with Meet-U in two French universities with master's students in bioinformatics and modeling, with protein-protein docking as the subject of the course. Meet-U is easy to implement and can be straightforwardly transferred to other fields and/or universities. All the information and data are available at www.meet-u.org.

  2. Proceedings of the EuBIC developer's meeting 2018

    DEFF Research Database (Denmark)

    Willems, Sander; Bouyssié, David; Deforce, Dieter

    2018-01-01

    The inaugural European Bioinformatics Community (EuBIC) developer's meeting was held from January 9th to January 12th 2018 in Ghent, Belgium. While the meeting kicked off with an interactive keynote session featuring four internationally renowned experts in the field of computational proteomics......, its primary focus were the hands-on hackathon sessions which featured six community-proposed projects revolving around three major topics: Here, we present an overview of the scientific program of the EuBIC developer's meeting and provide a starting point for follow-up on the covered projects....

  3. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  4. Twenty-sixth general conference meeting of representatives of RCA member states. Report

    International Nuclear Information System (INIS)

    1997-10-01

    The meeting discussed the following issues: RCA Annual Report 1996; Report of the 19th RCA Working Group Meeting, Yangon Myanmar, 10-14 March 1997; RCA in the next 25 years; Development finance and the RCA; locating a senior RCA representative in the region; RCA guidelines and operating rules; TCDC activities; terminal tripartite review meeting on UNDP/RCA/IAEA project; status of new joint UNDP/RCA/IAEA project; options for the new joint project; RCA activities and budget in 1997 and 1998; reformulation and health care project; RCA proposed programme for 1999-2000; country statements; extension of RCA agreement; RCA 25th anniversary; venue and date of the 20th regular meeting of national RCA representatives

  5. Twenty-sixth general conference meeting of representatives of RCA member states. Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The meeting discussed the following issues: RCA Annual Report 1996; Report of the 19th RCA Working Group Meeting, Yangon Myanmar, 10-14 March 1997; RCA in the next 25 years; Development finance and the RCA; locating a senior RCA representative in the region; RCA guidelines and operating rules; TCDC activities; terminal tripartite review meeting on UNDP/RCA/IAEA project; status of new joint UNDP/RCA/IAEA project; options for the new joint project; RCA activities and budget in 1997 and 1998; reformulation and health care project; RCA proposed programme for 1999-2000; country statements; extension of RCA agreement; RCA 25th anniversary; venue and date of the 20th regular meeting of national RCA representatives.

  6. Thirteenth meeting of representatives of RCA Member States

    International Nuclear Information System (INIS)

    1986-07-01

    The 13th Meeting of Member States of RCA (Regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology) was held on 26 September 1984 in Vienna. This document constitutes the report of that meeting. It includes the list of participants, agenda, summary of discussions, and 1984 costing table. The Report of Recommendations for the meeting consisted of the Summary Report of the Sixth RCA Working Group Meeting held in Kalpakkam, India, 20-23 March 1984. This Summary Report dealt with such topics as RCA research projects (including nuclear techniques to improve legume and buffalo production, radiosterilization of medical supplies, maintenance of nuclear instruments, isotope applications in hydrology and sedimentology), progress of the RCA/UNDP Industrial Project, and future programmes and budget

  7. Processing of Irradiated Graphite to Meet Acceptance Criteria for Waste Disposal. Results of a Coordinated Research Project

    International Nuclear Information System (INIS)

    2016-05-01

    Graphite is widely used in the nuclear industry and in research facilities and this has led to increasing amounts of irradiated graphite residing in temporary storage facilities pending disposal. This publication arises from a coordinated research project (CRP) on the processing of irradiated graphite to meet acceptance criteria for waste disposal. It presents the findings of the CRP, the general conclusions and recommendations. The topics covered include, graphite management issues, characterization of irradiated graphite, processing and treatment, immobilization and disposal. Included on the attached CD-ROM are formal reports from the participants

  8. 75 FR 40816 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Science.gov (United States)

    2010-07-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12626-002; Project No. 12717-002] Northern Illinois Hydropower, LLC; Notice of Meeting July 7, 2010. a. Date and Time of Meeting: Thursday, July 22, 2010 from 9 a.m. to 12 p.m. CDT. b. Place: Illinois Historic Preservation...

  9. How to Catch All Those Mutations—The Report of the Third Human Variome Project Meeting, UNESCO Paris, May 2010

    Science.gov (United States)

    Kohonen-Corish, Maija R.J.; Al-Aama, Jumana Y.; Auerbach, Arleen D.; Axton, Myles; Barash, Carol Isaacson; Bernstein, Inge; Béroud, Christophe; Burn, John; Cunningham, Fiona; Cutting, Garry R.; den Dunnen, Johan T.; Greenblatt, Marc S.; Kaput, Jim; Katz, Michael; Lindblom, Annika; Macrae, Finlay; Maglott, Donna; Möslein, Gabriela; Povey, Sue; Ramesar, Raj; Richards, Sue; Seminara, Daniela; Sobrido, María-Jesús; Tavtigian, Sean; Taylor, Graham; Vihinen, Mauno; Winship, Ingrid; Cotton, Richard G.H.

    2011-01-01

    The third Human Variome Project (HVP) Meeting “Integration and Implementation” was held under UNESCO Patronage in Paris, France, at the UNESCO Headquarters May 10–14, 2010. The major aims of the HVP are the collection, curation, and distribution of all human genetic variation affecting health. The HVP has drawn together disparate groups, by country, gene of interest, and expertise, who are working for the common good with the shared goal of pushing the boundaries of the human variome and collaborating to avoid unnecessary duplication. The meeting addressed the 12 key areas that form the current framework of HVP activities: Ethics; Nomenclature and Standards; Publication, Credit and Incentives; Data Collection from Clinics; Overall Data Integration and Access—Peripheral Systems/Software; Data Collection from Laboratories; Assessment of Pathogenicity; Country Specific Collection; Translation to Healthcare and Personalized Medicine; Data Transfer, Databasing, and Curation; Overall Data Integration and Access—Central Systems; and Funding Mechanisms and Sustainability. In addition, three societies that support the goals and the mission of HVP also held their own Workshops with the view to advance disease-specific variation data collection and utilization: the International Society for Gastrointestinal Hereditary Tumours, the Micronutrient Genomics Project, and the Neurogenetics Consortium. PMID:20960468

  10. How to catch all those mutations--the report of the third Human Variome Project Meeting, UNESCO Paris, May 2010.

    Science.gov (United States)

    Kohonen-Corish, Maija R J; Al-Aama, Jumana Y; Auerbach, Arleen D; Axton, Myles; Barash, Carol Isaacson; Bernstein, Inge; Béroud, Christophe; Burn, John; Cunningham, Fiona; Cutting, Garry R; den Dunnen, Johan T; Greenblatt, Marc S; Kaput, Jim; Katz, Michael; Lindblom, Annika; Macrae, Finlay; Maglott, Donna; Möslein, Gabriela; Povey, Sue; Ramesar, Raj; Richards, Sue; Seminara, Daniela; Sobrido, María-Jesús; Tavtigian, Sean; Taylor, Graham; Vihinen, Mauno; Winship, Ingrid; Cotton, Richard G H

    2010-12-01

    The third Human Variome Project (HVP) Meeting "Integration and Implementation" was held under UNESCO Patronage in Paris, France, at the UNESCO Headquarters May 10-14, 2010. The major aims of the HVP are the collection, curation, and distribution of all human genetic variation affecting health. The HVP has drawn together disparate groups, by country, gene of interest, and expertise, who are working for the common good with the shared goal of pushing the boundaries of the human variome and collaborating to avoid unnecessary duplication. The meeting addressed the 12 key areas that form the current framework of HVP activities: Ethics; Nomenclature and Standards; Publication, Credit and Incentives; Data Collection from Clinics; Overall Data Integration and Access-Peripheral Systems/Software; Data Collection from Laboratories; Assessment of Pathogenicity; Country Specific Collection; Translation to Healthcare and Personalized Medicine; Data Transfer, Databasing, and Curation; Overall Data Integration and Access-Central Systems; and Funding Mechanisms and Sustainability. In addition, three societies that support the goals and the mission of HVP also held their own Workshops with the view to advance disease-specific variation data collection and utilization: the International Society for Gastrointestinal Hereditary Tumours, the Micronutrient Genomics Project, and the Neurogenetics Consortium. © 2010 Wiley-Liss, Inc.

  11. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  12. Landsat Science Team meeting: Winter 2015

    Science.gov (United States)

    Schroeder, Todd A.; Loveland, Thomas; Wulder, Michael A.; Irons, James R.

    2015-01-01

    The summer meeting of the joint U.S. Geological Survey (USGS)–NASA Landsat Science Team (LST) was held at the USGS’s Earth Resources Observation and Science (EROS) Center July 7-9, 2015, in Sioux Falls, SD. The LST co-chairs, Tom Loveland [EROS—Senior Scientist] and Jim Irons [NASA’s Goddard Space Flight Center (GSFC)—Landsat 8 Project Scientist], opened the three-day meeting on an upbeat note following the recent successful launch of the European Space Agency’s Sentinel-2 mission on June 23, 2015 (see image on page 14), and the news that work on Landsat 9 has begun, with a projected launch date of 2023.With over 60 participants in attendance, this was the largest LST meeting ever held. Meeting topics on the first day included Sustainable Land Imaging and Landsat 9 development, Landsat 7 and 8 operations and data archiving, the Landsat 8 Thermal Infrared Sensor (TIRS) stray-light issue, and the successful Sentinel-2 launch. In addition, on days two and three the LST members presented updates on their Landsat science and applications research. All presentations are available at landsat.usgs.gov/science_LST_Team_ Meetings.php.

  13. ICE-DIP kicks off

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    Last month, Marie Curie Actions* added a new member to its ranks: ICE-DIP (the Intel-CERN European Doctorate Industrial Program). The programme held its kick-off meeting on 18-19 February in Leixlip near Dublin, Ireland, at Intel’s premises.   Building on CERN’s long-standing relationship with Intel in the CERN openlab project, ICE-DIP brings together CERN and industrial partners, Intel and Xena Networks, to train five Early Stage ICT Researchers. These researchers will be funded by the European Commission and granted a CERN Fellow contract while enrolled in the doctoral programmes at partner universities Dublin City University and National University of Ireland Maynooth. The researchers will go on extended secondments to Intel Labs Europe locations across Europe during their three-year training programme. The primary focus of the ICE-DIP researchers will be the development of techniques for acquiring and processing data that are relevant for the trigger a...

  14. EU supports the LHC high-luminosity study

    CERN Document Server

    CERN Bulletin

    2011-01-01

    The design collision energy and luminosity of the LHC are already at record numbers, making the machine one of the most complex scientific instruments ever built. However, to extend its discovery potential even further, a major upgrade of the LHC will be required around 2020. This will increase its average luminosity by a factor of 5 to 10 beyond its design value. Fifteen worldwide institutions and the European Union are supporting the initial design phase of the project through the HiLumi LHC programme, whose kick-off meeting will take place on 16-18 November.   The CERN team that has successfully built and tested the Short Magnet Coil – a small 40 cm long magnet capable of producing a 12.5 T magnetic field. The upgrade of the LHC will require about 10 years of design, construction and implementation. The new machine configuration will be called “High Luminosity LHC” (HL-LHC). The similarly named “HiLumi LHC” is the EU programme that supports...

  15. 77 FR 2286 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12717-002] Northern Illinois Hydropower, LLC; Notice of Meeting a. Date and Time of Meeting: Thursday, January 26, 2012 from 11... Meeting: Commission staff will meet with Northern Illinois Hydropower, LLC to discuss potentially moving...

  16. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  17. 77 FR 2766 - Arts Advisory Panel Meeting

    Science.gov (United States)

    2012-01-19

    ... NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Arts Advisory Panel Meeting AGENCY: National Endowment for the Arts, National Foundation on the Arts and Humanities. ACTION: Notice; correction. SUMMARY... and Regional/Folk and Traditional Arts (state folk arts projects review) meeting, scheduled for...

  18. Investigating mind markers in design meetings

    NARCIS (Netherlands)

    Heylen, Dirk K.J.

    In the context of the European AMI1 project, “Augmented Multiparty Interaction��? more than one hundred hours of video and audio data have been collected of groups of four people engaged in a meeting with the task to design a new remote control. The collection of meetings is being annotated on

  19. The fourth UNDP/RCA/IAEA/meeting of national co-ordinators for radiation technology. Report

    International Nuclear Information System (INIS)

    1996-01-01

    The objectives of the Meeting were to provide information for the Terminal Report of the joint UNDP/RCA/IAEA project RAS/92/073 and to look into future activities under the Radiation Technology project. The main achievements of this Meeting are: The Meeting reviewed the implementation of all radiation technology sub-projects and agreed that all of them were successful but not yet equally developed among RCA Member States. The Meeting recommended to have three projects carried out in the form of Co-ordinated Research Programs and requested the IAEA to find new ways to implement the organized in RCA Member States to carry these CRPs out. Figs, tabs

  20. The Project of Success

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    more complicated matter than meeting targets. While success may ultimately be justified in terms of a correspondence between aims and achievements, the understanding of both aspects is highly dependent on the project process. An example of a successful project that did not meet the original performance...... targets will serve to show that success is at matter of perspective as much as it is a matter of achievement. Other types of research, e.g. social psychology, have addressed the issue of success more explicitly. I draw on such literature to conceptualize project success anew and to reestablish...

  1. ACCU Meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 7 March 2007 at 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car-sharing pilot project Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 9 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finland K. Lassila-Perini (79354) France F. Kunne S. ...

  2. ACCU MEETING

    CERN Multimedia

    PH Department

    2009-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 11 March 2009 At 9:15 a.m. in room 60-6-002 Chairman’s remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management The CERN Press Office An update on Safety at CERN The Burotel project Reports from ACCU representatives on other committees Users’ Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to mailto:Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria G. Walzel () Belgium C. Vander Velde (71539) Bulgaria Czech Republic P. Závada (75877) Denmark...

  3. 76 FR 45249 - Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting

    Science.gov (United States)

    2011-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting On August 5, 2011, Office of Energy Projects staff may participate in a public meeting hosted by the U.S. Army Corps of Engineers, Baltimore District (Corps) for the...

  4. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  5. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  6. Landsat science team meeting: Summer 2015

    Science.gov (United States)

    Schroeder, Todd; Loveland, Thomas; Wulder, Michael A.; Irons, James R.

    2015-01-01

    The summer meeting of the joint U.S. Geological Survey (USGS)–NASA Landsat Science Team (LST) was held at the USGS’s Earth Resources Observation and Science (EROS) Center July 7-9, 2015, in Sioux Falls, SD. The LST co-chairs, Tom Loveland [EROS—Senior Scientist] and Jim Irons [NASA’s Goddard Space Flight Center (GSFC)—Landsat 8 Project Scientist], opened the three-day meeting on an upbeat note following the recent successful launch of the European Space Agency’s Sentinel-2 mission on June 23, 2015 (see image on page 14), and the news that work on Landsat 9 has begun, with a projected launch date of 2023.

  7. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  8. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong.

    Science.gov (United States)

    Chu, Joanna T W; Wan, Alice; Stewart, Sunita M; Ng, Kwok Tung; Lam, Tai Hing; Chan, Sophia S

    2018-01-01

    Recruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project-entitled the Learning Families Project-conducted in Hong Kong. In collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned. Over a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants). Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter) being more effective than passive strategies (i.e., posters and leaflets); the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects). The lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  9. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  10. STAR Measurements and Modeling for Quantifying Air Quality and Climatic Impacts of Residential Biomass or Coal Combustion for Cooking, Heating and Lighting Kick-off Meeting

    Science.gov (United States)

    STAR grantees and EPA scientists will discuss progress on their projects which aim to quantify the extent to which interventions for cleaner cooking, heating, or lighting can impact air quality and climate, which in turn affect human health and welfare

  11. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  12. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  13. CFCC working group meeting: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The theme of the meeting was ``A Path to Commercialization`` and discussion was devoted to addressing the nearest-term products and the time frame for implementation. The objectives of the meeting were to identify the barriers to commercialization, methods to overcome these barriers, and the actions required to achieve success. The meeting was planned to bring together government agencies and industry customers and, suppliers to discuss and conclude where the CFCC Program is today, where it is going, and how they plan to get there. It was also planned to join component developers with end users who can describe systems needs and projected schedules for introducing CFCC components in industrial applications.

  14. Improving Family Meetings in Intensive Care Units: A Quality Improvement Curriculum.

    Science.gov (United States)

    Gruenewald, David A; Gabriel, Michelle; Rizzo, Dorothy; Luhrs, Carol A

    2017-07-01

    Family meetings in the intensive care unit are associated with beneficial outcomes for patients, their families, and health care systems, yet these meetings often do not occur in a timely, effective, reliable way. The Department of Veterans Affairs Comprehensive End-of-Life Care Implementation Center sponsored a national initiative to improve family meetings in Veterans Affairs intensive care units across the United States. Process measures of success for the initiative were identified, including development of a curriculum to support facility-based quality improvement projects to implement high-quality family meetings. Identified curriculum requirements included suitability for distance learning and applicability to many clinical intensive care units. Curriculum modules were cross-mapped to the "Plan-Do-Study-Act" model to aid in planning quality improvement projects. A questionnaire was e-mailed to users to evaluate the curriculum's effectiveness. Users rated the curriculum's effectiveness in supporting and achieving aims of the initiative as 3.6 on a scale of 0 (not effective) to 4 (very effective). Users adapted the curriculum to meet local needs. The number of users increased from 6 to 17 quality improvement teams in 2 years. All but 3 teams progressed to implementation of an action plan. Users were satisfied with the effectiveness and adaptability of a family-meeting quality improvement curriculum to support implementation of a quality improvement project in Veterans Affairs intensive care units. This tool may be useful in facilitating projects to improve the quality of family meetings in other intensive care units. ©2017 American Association of Critical-Care Nurses.

  15. Fifth technical meeting on quality

    International Nuclear Information System (INIS)

    Girard, A.

    1998-01-01

    This article reports on the 5th Technical Meeting on Quality which was held in San Diego on 20-22 October 1997 and which was attended by representatives of the Home and Joint Central Team and of manufacturers currently involved in the Large R and D projects. The meeting made progress towards the finalization of the ITER Quality Manual document for inclusion in the Final Design Report and the definition of the quality necessary for ITER procurement and construction

  16. Audio-Visual Processing in Meetings: Seven Questions and Current AMI Answers

    NARCIS (Netherlands)

    Al-Hamas, Marc; Hain, Thomas; Cernocky, Jan; Schreiber, Sascha; Poel, Mannes; Rienks, R.J.

    2007-01-01

    The project Augmented Multi-party Interaction (AMI) is concerned with the development of meeting browsers and remote meeting assistants for instrumented meeting rooms – and the required component technologies R&D themes: group dynamics, audio, visual, and multimodal processing, content abstraction,

  17. ACCU MEETING

    CERN Document Server

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 6 December 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Safety at CERN Car sharing pilot project CERN Public Web Sites and Intranet Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria   Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finl...

  18. ACCU Meeting

    CERN Multimedia

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 6 December 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Safety at CERN Car sharing pilot project CERN Public Web Sites and Intranet Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria   Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finl...

  19. ACCU Meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 7 March 2007 at 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car-sharing pilot project Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 9 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finland K. Lassila-Perini (79354) France F. Kunne S. La...

  20. ACCU MEETING

    CERN Multimedia

    PH Department

    2009-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 11 March 2009 At 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks 2.\tAdoption of the agenda 3.\tMinutes of the previous meeting 4.\tMatters arising 5.\tNews from the CERN Management 6.\tThe CERN Press Office 7.\tAn update on Safety at CERN 8.\tThe Burotel project 9.\tReports from ACCU representatives on other committees 10.\tUsers’ Office news 11.\tAny Other Business 12.\tAgenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to mailto:Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria G. Walzel () Belgium C. Vander Velde (71539) Bulgaria C...

  1. ACCU Meeting

    CERN Document Server

    Chris Onions

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 14 June 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car sharing pilot project The CERN Document Server : the portal to Open Access Videoconferencing and collaborative tools at CERN Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (7...

  2. ACCU Meeting

    CERN Document Server

    Chris Onions

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 14 June 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car sharing pilot project The CERN Document Server : the portal to Open Access Videoconferencing and collaborative tools at CERN Reports from ACCU representatives on other committees Users'Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) ...

  3. American Telemedicine Association: 18th Annual International Meeting & Tradeshow

    Directory of Open Access Journals (Sweden)

    Benjamin Forstag

    2012-12-01

    Full Text Available For 18 years, the American Telemedicine Association (ATA Annual International Meeting & Exposition has been the premier forum for professionals in the telemedicine, telehealth and mHealth space -- one of the fastest growing meetings in the country. ATA 2013 is on course to be the largest ATA meeting ever, with over 6,000 projected attendees.  The program will include 500 educational sessions and posters, highlighting the latest innovations, applications and research in telemedicine. The 2013 exhibit hall will feature nearly 300 of the leading vendors in remote healthcare technologies. With over 6000 projected attendees, from all around the world, there's no better place to meet and network with your peers and thought leaders in the field. Detailed program information--including courses, sessions and CME information--will be available January 2013 at:http://www.americantelemed.org.

  4. 113th ACCU Meeting

    CERN Multimedia

    2016-01-01

    Agenda for the meeting to be held on Tuesday, 6 September 2016​ at 9.15 a.m. in room Georges Charpak (Room F, 60-6-015).   Chairperson's remarks Adoption of the agenda      Minutes of the previous meeting News from the CERN Management Report on services from SMB Department Report on services from IT Department The International School Ferney-Voltaire / St. Genis The CERN Alumni Project Changes in rules to obtain dosimeters Changes of CHIS health insurance rules for MPAs Matters arising Any Other Business ACCU meetings 2017 Agenda for the next meeting   The Advisory Committee of CERN Users (ACCU) is a forum for discussion between the CERN Management and representatives of the CERN Users in order to review the practical means taken by CERN to support the work of Users of the Laboratory. The User Representatives to ACCU are: Austria M. Jeitler (manfred.jeitler@cern.ch) Belgium M. T...

  5. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  6. Workshop on Physics Beyond Colliders

    CERN Document Server

    2016-01-01

    The aim of the workshop is to explore the opportunities offered by the CERN accelerator complex and infrastructure to get new insights into some of today's outstanding questions in particle physics through projects complementary to high-energy colliders and other initiatives in the world. The focus is on fundamental physics questions that are similar in spirit to those addressed by high-energy colliders, but that may require different types of experiments. The kick-off workshop is intended to stimulate new ideas for such projects, for which we encourage the submission of abstracts.

  7. 4th Annual DOE-ERSP PI Meeting: Abstracts

    International Nuclear Information System (INIS)

    Hazen, Terry C.

    2009-01-01

    This contains abstracts from the 2009 Annual Environmental Remediation Sciences Program (ERSP) Principal Investigators (PI) Meeting. The ERSP seeks to advance fundamental science to understand, predict, and mitigate the impacts of environmental contamination from past nuclear weapons production and provide a scientific basis for the long-term stewardship of nuclear waste disposal. These ambitious goals cannot be achieved by any one project alone. Therefore, ERSP funds a combination of research programs at the DOE national laboratories, individual projects at universities and federal agencies, and large long(er)-term field site research. Integration of these activities to advance the ERSP goals is a constant challenge, but made significantly simpler by bringing together all funded ERSP researchers once a year to discuss the very latest research results. It is at these meetings where new ideas and/or scientific advancements in support of ERSP goals can be discussed and openly debated among all PIs in the program. The ERSP thrives, in part, on the new ideas, concepts, scientific connections, and collaborations generated as a result of these meetings. The annual PI Meeting is very much a working meeting with three major goals: (1) to provide opportunities for scientific interaction among the ERSP scientists, a critical element for the program; (2) to provide the ERSP program staff with an opportunity to evaluate the progress of each program and project; and (3) to showcase the ERSP to interested parties within DOE and within other federal agencies In addition to program managers from within OBER, there will be representatives from other offices within DOE and other federal agencies in attandance at the meeting.

  8. 4th Annual DOE-ERSP PI Meeting: Abstracts

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, Terry C.

    2009-03-01

    This contains abstracts from the 2009 Annual Environmental Remediation Sciences Program (ERSP) Principal Investigators (PI) Meeting. The ERSP seeks to advance fundamental science to understand, predict, and mitigate the impacts of environmental contamination from past nuclear weapons production and provide a scientific basis for the long-term stewardship of nuclear waste disposal. These ambitious goals cannot be achieved by any one project alone. Therefore, ERSP funds a combination of research programs at the DOE national laboratories, individual projects at universities and federal agencies, and large long(er)-term field site research. Integration of these activities to advance the ERSP goals is a constant challenge, but made significantly simpler by bringing together all funded ERSP researchers once a year to discuss the very latest research results. It is at these meetings where new ideas and/or scientific advancements in support of ERSP goals can be discussed and openly debated among all PIs in the program. The ERSP thrives, in part, on the new ideas, concepts, scientific connections, and collaborations generated as a result of these meetings. The annual PI Meeting is very much a working meeting with three major goals: (1) to provide opportunities for scientific interaction among the ERSP scientists, a critical element for the program; (2) to provide the ERSP program staff with an opportunity to evaluate the progress of each program and project; and (3) to showcase the ERSP to interested parties within DOE and within other federal agencies In addition to program managers from within OBER, there will be representatives from other offices within DOE and other federal agencies in attandance at the meeting.

  9. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  10. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  11. The ITER management advisory committee (MAC) meeting in Cadarache

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    1999-01-01

    The ITER management advisory committee meeting was held on 8 March in Cadarache, France. The main topics were the ITER EDA Status Report in the period between the ITER Meeting in Yokohama (October 1990) and February 1999. In particular, the management advisory committee shares the director's concern about the uncertainties against which the whole project operates at present. They also noted that the definition of an appropriate framework for continued US involvement in on-going projects is a very important issue

  12. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J; Kaut, W [eds.

    1991-01-01

    This book, the proceedings of the fourth PV-Contractors' Meeting organized by the Commission of the European Communities, Directorate-General for Energy, held at Brussels on 21 and 22 November 1989, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the Energy Demonstration Program since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984, 1985 and 1986, describing progress with their projects. Summaries of the discussions held at the meeting, which included contractors whose projects were submitted in 1987, are also presented. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include desalination, communications, dairy farms, water pumping, and warning systems. Papers have been processed separately for inclusion on the data base.

  13. The Halden Reactor Project workshop meeting on human centred automation and function allocation methods

    International Nuclear Information System (INIS)

    Sebok, Angelia; Green, Marit; Larsen, Marit; Miberg, Ann Britt; Morisseau, Dolores

    1998-02-01

    A workshop on Human Centred Automation (HCA) and Function Allocation Methods was organised in Halden, September 29-30, 1997. The purpose of the workshop was to discuss and make recommendations on requirements for the Halden Project research agenda. The workshop meeting began with several presentations summarising current issues in HCA, Function Allocation Methods and Functional Modelling. Invited speakers presented their research or modelling efforts. Following the presentations, the workshop was divided into three working groups, all tasked with answering the same four questions: (1) What are the most important issues in Human Centred Automation? (2) Which strengths could be achieved by integrating Functional Modelling Methods into experimental Human Centred Automation research? (3) How should analytical and experimental methods be balanced? (4) What are the most important aspects in automation design methodology? Each group discussed the questions and produced specific recommendations that were summarised by the group's facilitator in a joint session of the workshop. (author)

  14. 77 FR 27417 - Sunshine Act Meetings

    Science.gov (United States)

    2012-05-10

    ... Agenda II. Approval of the March 9, 2012 Meeting Minutes III. Program Planning Update and discussion of projects: Strategic Planning Process Discussion on 2013 Statutory Report Selection Process IV. Management...

  15. 75 FR 34740 - Sunshine Act Meeting

    Science.gov (United States)

    2010-06-18

    ... resolution re: Final Rule: Temporary Liquidity Guarantee Program. Memorandum re: Deposit Insurance Fund Loss, Income and Reserve Ratio Projection Update for the Restoration Plan. The meeting will be held in the...

  16. 75 FR 10813 - Notice of Public Meetings for the Steens Mountain Advisory Council

    Science.gov (United States)

    2010-03-09

    ...; November 18 and 19, 2010 in Bend, Oregon; and July 1 and 2, 2010 in Diamond, Oregon. All meeting sessions.... The July meeting will be held at the Diamond School on Diamond Lane in Diamond, Oregon. The November... Ecosystem Restoration Project implementation; Science Strategy; South Steens Water Development Project...

  17. Kick-off research coordination meeting of the IAEA coordinated research project on analyses of, and lessons learned from the operational experience with fast reactor equipment and systems. Working material

    International Nuclear Information System (INIS)

    2007-01-01

    The specific objectives of the IAEA Coordinated Research Project (CRP) on Analyses of, and Lessons Learned from the Operational Experience with Fast Reactor Equipment and Systems are to - Preserve the feedback from commissioning, operation, and decommissioning experience of experimental and power sodium cooled fast reactors; - Enable easy access to the information from this feedback; - Produce lessons-learned/synthesis reports from the commissioning, operation, and decommissioning of experimental and power sodium cooled fast reactors. To achieve these objectives, the CRP participants will retrieve, assess and archive all the documentation and information relevant to feedback from commissioning, operation, and decommissioning of sodium cooled fast reactors. The archiving step may include conversion of the documents in electronic form and the preparation of electronic databases organized along scientific/technical topics and reactors. Then, the CRP will work on the critical review, assessment, and systematization of the available data, and will publish synthesis reports, including the appropriate recommendations from the 'lessons learned'. It is important to stress that these generalization efforts are crucial in view of the generational change occurring now: preserving the knowledge and experience of the generation who participated in the initial development work of sodium cooled fast reactors and is now retiring, and ultimately ensuring the systematic use of the operational feedback in the form of a 'lessons learned' approach, is essential since it was in the early stage of the studies that the key decisions and design choices were made. To accomplish the lessons-learned and synthesising work requires for as many as possible of the highly skilled specialists and pioneers in the sodium cooled fast reactor research and development area to be actively involved in the CRP. Thus, the first stage of the CRP will address feedback from operational experience with regard to

  18. Meet EPA Researcher Endalkachew Sahle-Demessie

    Science.gov (United States)

    Meet EPA Researcher Endalkachew Sahle-Demessie. Chemical and Environmental Engineer Endalkachew Sahle-Demessie, Ph.D., works on various projects, including nanomaterials and water resources, in EPA’s National Risk Management Research Laboratory.

  19. Low-level waste forum meeting reports

    International Nuclear Information System (INIS)

    1992-01-01

    This paper provides highlights from the summer meeting of the Low Level Radioactive Waste Forum. Topics of discussion included: responsibility for nonfuel component disposal; state experiences in facility licensing; and volume projections

  20. 76 FR 39077 - Notice of Commission Meeting and Public Hearing

    Science.gov (United States)

    2011-07-05

    ... business meeting. The conference session and business meeting both are open to the public and will be held... be held during the 1:30 p.m. business meeting include the dockets listed below. 1. Spring City... Nos. 1, 2, 3, and 5 in the Lockatong Formation and Brunswick Group. The project is located in the East...

  1. Single-Family Houses That Meet The Future Energy Demands

    DEFF Research Database (Denmark)

    Rose, Jørgen; Svendsen, Svend

    2002-01-01

    ). Before any further tightening of the regulations are introduced, however, it is necessary to illustrate the consequences of such actions with regard to finance, building technology, indoor climate and comfort. Therefore a series of investigations and experimental projects are being launched, in order...... to examine these consequences thoroughly. The department is presently contributing to this end by participating in quite a few investigative projects, where single-family houses are designed to meet the proposed future energy demands. This paper describes the results obtained from one such project where...... the department, in co-operation with a major building entrepreneur, has developed a single-family house that shows that there are no evident problems in meeting the future energy demands....

  2. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  3. IEA Task 32: Wind Lidar Systems for Wind Energy Deployment (LIDAR)

    Energy Technology Data Exchange (ETDEWEB)

    Kuhn, Martin; Trabucchi, Davide; Clifton, Andrew; Courtney, Mike; Rettenmeier, Andreas

    2016-05-25

    Under the International Energy Agency Wind Implementing Agreement (IEA Wind) Task 11, researchers started examining novel applications for remote sensing and the issues around them during the 51st topical expert meeting about remote sensing in January 2007. The 59th topical expert meeting organized by Task 11 in October 2009 was also dedicated to remote sensing, and the first draft of the Task's recommended practices on remote sensing was published in January 2013. The results of the Task 11 topical expert meetings provided solid groundwork for a new IEA Wind Task 32 on wind lidar technologies. Members of the wind community identified the need to consolidate the knowledge about wind lidar systems to facilitate their use, and to investigate how to exploit the advantages offered by this technology. This was the motivation that led to the start of IEA Wind Task 32 'Lidar Application for Wind Energy Deployment' in November 2011. The kick-off was meeting was held in May 2012.

  4. Collaborative International Evaluated Library Organisation Pilot Project. CIELO meeting, NEA Headquarters, 18-20 May 2015

    International Nuclear Information System (INIS)

    Mattoon, Caleb; Brown, David; Trkov, Andrej; Plompen, Arjan; Hawari, Ayman I.; Roubtsov, Danila; Kim, Do Heon; Bauge, Eric; Palmiotti, Giuseppe; Kessedjian, Gregoire; Conlin, Jeremy Lloyd; Qian, Jing; Leal, Luiz Carlos; Chadwick, Mark; Herman, Michal Wladyslaw; White, Morgan C.; Cabellos, Oscar; Romain, Pascal; Schillebeeckx, Peter; Ichou, Raphaelle; Jacqmin, Robert; Hilaire, Stephane; Danon, Yaron; Ge, Zhigang; Malvagi, Fausto; Kahler, Albert C. Skip; Morillon, Benjamin; Mcnabb, Dennis P.; Oleynik, Dmitry S.; Wu, Haicheng; Marquez Damian, Jose Ignacio; Yokoyama, Kenji; Dunn, Michael; Cho, Young-Sik; Pignet, Sophie; Ignatyuk, Anatoly V.; Leeb, Helmut; Wang, Wenming; Ruan, Xichao

    2015-05-01

    WPEC subgroup 40-CIELO (Collaborative International Evaluated Library Organization) provides a new working paradigm to facilitate evaluated nuclear reaction data advances. It brings together experts from across the international nuclear reaction data community to identify and document discrepancies among existing evaluated data libraries, measured data, and model calculation interpretations, and aims to make progress in reconciling these discrepancies to create more accurate ENDF-formatted files. SG40-CIELO focusses on 6 important isotopes: "1H, "1"6O, "5"6Fe, "2"3"5","2"3"8U, "2"3"9Pu. This document is the proceedings of the CIELO meeting, held at the NEA Headquarters on 18-20 May 2015. It comprises all the available presentations (slides) given by the participants: A - CIELO project: - 1: Status of Cross Section Progress (M. Chadwick); - 2: Update on CIELO Related Measurements at RPI (Y. Danon); - 3: IAEA-NDS and the CIELO Project (A. Trkov); - 4: LANL Criticality Data Testing using CIELO Candidate Evaluations (S. Kahler); - 5: ENDF/B-VII.1 vs. CIELO (R. Cullen); B - O"1"6: - 6: n+"1"6O (A. Plompen); - 7: Resonance Evaluations for "1"6O for the CIELO Project (L. Leal); - 8: Validation of Leal and Hale O-16 Evaluations against FNS/JAEA Liquid Oxygen ToF Benchmark (I. Kodeli); - 9: Cierjacks 1968, Cierjacks 1980 and RPI 2015 (C.R. Lubitz); - 10: O"1"6 Items (C.R. Lubitz); C - Fe"5"6: - 11: Iron in fast neutron range, beta-0 evaluation for "5"6Fe (M. Herman); - 12: Data Evaluation at ORNL (L. Leal); - 13: IAEA-NDS and the CIELO Project Fe-56 (A. Trkov); - 14: The evaluation of experimental data in fast range for "5"6Fe (Z. Ge); D - H1 - 15: Reactivity effect of New Light and Heavy Water TSL on Critical Systems (J.I. Marquez); E - Big3: - 16: Resonance Evaluations of "2"3"5U for the CIELO Project (L. Leal); - 17: IAEA-NDS and the CIELO Project U-235 (A. Trkov); - 18: Status of "2"3"5U CIELO evaluation (B. Morillon); - 19: U"2"3"5 Items (C.R. Lubitz); - 20: Fission

  5. Oklo working group meeting

    International Nuclear Information System (INIS)

    Von Maravic, H.

    1993-01-01

    Natural analogue studies have been carried out for several years in the framework of the European Community's R and D programme on radioactive waste; and within its recent fourth five-year programme on 'Management and storage of radioactive waste (1990-94)' the Community is participating in the Oklo study, natural analogue for transfer processes in a geological repository. The Oklo project is coordinated by CEA-IPSN (F) and involves laboratories from several CEA directorates (IPSN, DTA and DCC) which collaborate with other institutions from France: CREGU, Nancy; CNRS, Strasbourg and ENSMD, Fontainebleau. Moreover, institutes from non-EC member States are also taking part in the Oklo study. The second joint CEC-CEA progress meeting of the Oklo Working Group was held in April 1992 in Brussels and gave the possibility of reviewing and discussing progress made since its first meeting in February 1991 at CEA in Fontenay-aux-Roses. About 40 participants from 15 laboratories and organizations coming from France, Canada, Gabon, Japan, Sweden and the USA underline the great interest in the ongoing research activities. The meeting focused on the different tasks within the CEC-CEA Oklo project concerning (i) field survey and sampling, (ii) characterization of the source term, (iii) studies of the petrographical and geochemical system, and (iv) studies of the hydrogeological system and hydrodynamic modelling. (author) 17 papers are presented

  6. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  7. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  8. Scoping Meeting Summary , Pahoa, Hawai'i, March 1992, 2 PM Session

    Energy Technology Data Exchange (ETDEWEB)

    Quinby-Hunt, Mary S.

    1992-06-08

    The meeting began with presentations by the facilitator, Mr. Spiegel, and the representative from DOE, Dr. Lewis. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process.

  9. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 5 December 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks7.\tEmergency Services at CERN 2.\tAdoption of the agenda\t8.\tThe Meyrin Tram project 3.\tMinutes of the previous meeting9.\tReports from ACCU representatives on other committees 4.\tMatters arising10.\tUsers’ Office news 5.\tNews from the CERN Management11.\tElection of ACCU Chair 6. LHC 2008 start-up events 6.\tLogistics and transport at CERN 12.\tAny Other Business 13.\tAgenda for the next meeting Anyone wishing to raise any points under item 12 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Aust...

  10. ACCU meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 5 December 2007 At 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks 2.\tAdoption of the agenda 3.\tMinutes of the previous meeting 4.\tMatters arising 5.\tNews from the CERN Management 6.\tLHC 2008 start-up events 7.\tEmergency Services at CERN 8.\tThe Meyrin Tram project 9.\tReports from ACCU representatives on other committees 10.\tUsers’ Office news 11.\tElection of ACCU Chair 12.\tAny Other Business 13.\tAgenda for the next meeting Anyone wishing to raise any points under item 12 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilq...

  11. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 12 September 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks7.\tCar sharing pilot project 2.\tAdoption of the agenda\t8.\tReports from ACCU representatives on other committees 3.\tMinutes of the previous meeting9.\tUsers’ Office newss 4.\tMatters arising10.\tAny Other Business 5.\tNews from the CERN Management11.\tAgenda for the next meeting 6.\tLogistics and transport at CERN Anyone wishing to raise any points under item 10 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria\tW. Adam (71661)NorwayG. Løvhøiden (73176)Belgium\tG. Wilquet (74664)PolandM. Witek (78967)...

  12. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 12 September 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks6.\tLogistics and transport at CERN2.\tAdoption of the agenda\t7.\tCar sharing pilot project3.\tMinutes of the previous meeting8.\tReports from ACCU representatives on other committees4.\tMatters arising9.\tUsers’ Office newss5.\tNews from the CERN Management10.\tAny Other Business11.\tAgenda for the next meeting Anyone wishing to raise any points under item 10 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria\tW. Adam (71661)NorwayG. Løvhøiden (73176)Belgium\tG. Wilquet (74664)PolandM. Witek (78967)Bulgaria\tPortugalP...

  13. 40 CFR 35.2218 - Project performance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  14. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  15. Processing of Irradiated Graphite to Meet Acceptance Criteria for Waste Disposal. Results of a Coordinated Research Project. Companion CD-ROM

    International Nuclear Information System (INIS)

    2016-05-01

    Graphite is widely used in the nuclear industry and in research facilities and this has led to increasing amounts of irradiated graphite residing in temporary storage facilities pending disposal. This publication arises from a coordinated research project (CRP) on the processing of irradiated graphite to meet acceptance criteria for waste disposal. It presents the findings of the CRP, the general conclusions and recommendations. The topics covered include, graphite management issues, characterization of irradiated graphite, processing and treatment, immobilization and disposal. Included on the attached CD-ROM are formal reports from the participants

  16. Spacecraft fabrication and test MODIL. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Saito, T.T.

    1994-05-01

    This report covers the period from October 1992 through the close of the project. FY 92 closed out with the successful briefing to industry and with many potential and important initiatives in the spacecraft arena. Due to the funding uncertainties, we were directed to proceed as if our funding would be approximately the same as FY 92 ($2M), but not to make any major new commitments. However, the MODIL`s FY 93 funding was reduced to $810K and we were directed to concentrate on the cryocooler area. The cryocooler effort completed its demonstration project. The final meetings with the cryocooler fabricators were very encouraging as we witnessed the enthusiastic reception of technology to help them reduce fabrication uncertainties. Support of the USAF Phillips Laboratory cryocooler program was continued including kick-off meetings for the Prototype Spacecraft Cryocooler (PSC). Under Phillips Laboratory support, Gill Cruz visited British Aerospace and Lucas Aerospace in the United Kingdom to assess their manufacturing capabilities. In the Automated Spacecraft & Assembly Project (ASAP), contracts were pursued for the analysis by four Brilliant Eyes prime contractors to provide a proprietary snap shot of their current status of Integrated Product Development. In the materials and structure thrust the final analysis was completed of the samples made under the contract (``Partial Automation of Matched Metal Net Shape Molding of Continuous Fiber Composites``) to SPARTA. The Precision Technologies thrust funded the Jet Propulsion Laboratory to prepare a plan to develop a Computer Aided Alignment capability to significantly reduce the time for alignment and even possibly provide real time and remote alignment capability of systems in flight.

  17. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  18. EuCARD2: enhanced accelerator research and development in Europe

    Science.gov (United States)

    Romaniuk, Ryszard S.

    2013-10-01

    Accelerator science and technology is one of a key enablers of the developments in the particle physic, photon physics and also applications in medicine and industry. EuCARD2 is an European research project which will be realized during 2013-2017 inside the EC FP7 framework. The project concerns the development and coordination of European Accelerator Research and Development. The project is particularly important, to a number of domestic laboratories, due to some plans to build large accelerator infrastructure in Poland. Large accelerator infrastructure of fundamental and applied research character stimulates around it the development and industrial applications as well as biomedical of advanced accelerators, material research and engineering, cryo-technology, mechatronics, robotics, and in particular electronics - like networked measurement and control systems, sensors, computer systems, automation and control systems. The paper presents a digest of the European project EuCARD2 which is Enhanced European Coordination for Accelerator Research and Development. The paper presents a digest of the research results and assumptions in the domain of accelerator science and technology in Europe, shown during the final fourth annual meeting of the EuCARD - European Coordination of Accelerator R&D, and the kick-off meeting of the EuCARD2. There are debated a few basic groups of accelerator systems components like: measurement - control networks of large geometrical extent, multichannel systems for large amounts of metrological data acquisition, precision photonic networks of reference time, frequency and phase distribution, high field magnets, superconducting cavities, novel beam collimators, etc. The paper bases on the following materials: Internet and Intranet documents combined with EuCARD2, Description of Work FP7 EuCARD-2 DoW-312453, 2013-02-13, and discussions and preparatory materials worked on by Eucard-2 initiators.

  19. SCK-CEN participation to the IAEA CRP-8 - Area topic no. 2: ''Application of the master curve for dynamic testing''. Activity 2005

    International Nuclear Information System (INIS)

    Lucon, E.

    2005-11-01

    The latest IAEA Co-ordinated Research Project (CRP-8) focuses on the application of the Master Curve approach to monitor fracture toughness of reactor pressure vessels in nuclear power power plants. Three main work areas have been identified: (a) constraint and geometry effects on Master Curve To values; (b) loading rate effects up to impact conditions; (c) potential changes of Master Curve shape for highly embrittled materials. After the kick-off meeting in Vienna in October 2004, the first Research Coordination Meeting was held in May 2005, hosted by AEKI Budapest. The present document focuses on the participation and contribution of SCK-CEN to Topic Area no. 2 (Loading rate effects on Master Curve - Impact Loading), for which E. Lucon acts as co-task leader. A Round-Robin exercise is planned for early 2006, consisting in 10 tests per participant on precracked Charpy-V specimen of JRQ, tested dynamically using an instrumented pendulum; the results will be analysed using the Master Curve procedure (ASTM E1921-05) and compared to data obtained at other loading rates (quasi-static and/or dynamic). Guidelines and detailed specifications have been produced and circulated after the meeting in Budapest. SCK-CEN has also produced data reporting sheets in EXCEL97 form, which will be used for reporting all fracture toughness test results (at quasi-static, dynamic or impact loading rates) performed in the framework of the CRP-8. (author)

  20. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    International Nuclear Information System (INIS)

    MCGRATH, G.M.

    2000-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration

  1. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  2. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  3. 76 FR 28023 - Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232-522; Project No. 516-459] Duke Energy Carolinas, LLC, South Carolina Electric & Gas Company; Notice of Meetings On March 18, 2011, the National Marine Fisheries Service (NMFS) requested a meeting with Duke Energy Carolinas, LLC...

  4. URBAN WOOD/COAL CO-FIRING IN THE BELLEFIELD BOILERPLANT

    International Nuclear Information System (INIS)

    James T. Cobb, Jr.; Gene E. Geiger; William W. Elder III

    2001-01-01

    During the second quarter, important preparatory work was continued so that the experimental activities can begin toward the end of the third quarter or early in the fourth quarter. The Environmental Questionnaire was submitted to the U.S. DOE National Energy Technology Laboratory (NETL), after thorough review by the Bellefield Boiler Plant (BBP). Letters were submitted to the Allegheny County Health Department (ACHD) and the Pennsylvania Department of Environmental Protection (PADEP) to seek R and D variances for permits at the BBP, the J. A. Rutter Company (JARC), and Emery Tree Service (ETS) for their portion of the project. Memoranda of understanding were executed by the University of Pittsburgh (University) with the BBP, JARC and ETS. Construction wood was collected from Thompson Properties. Discussions were held with the BBP and Energy Systems Associates (ESA), the BBP's engineering consultant. Presentations describing the University of Pittsburgh Wood/Coal Co-Firing Program were provided to the American Chemical Society (ACS), the Federal Energy Management Program (FEMP), the Upgraded Coal Interest Group (UCIG) of the Electric Power Research Institute (EPRI), the Engineering Center for Environment and Energy (ECEE) of the University of Pittsburgh, the Pittsburgh Coal Conference (PCC), the Pennsylvania Ethanol Workshop, BioEnergy 2000 and the Kick-Off Meeting of the Biomass Cofiring Opportunities Solicitation Projects

  5. Assessment and financing of electric power projects

    International Nuclear Information System (INIS)

    Moscote, R.A.

    1976-01-01

    The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  6. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  7. 2016 Accelerators meeting

    International Nuclear Information System (INIS)

    Spiro, Michel; Revol, Jean-Luc; Biarrotte, Jean-Luc; Napoly, Olivier; Jardin, Pascal; Chautard, Frederic; Thomas, Jean Charles; Petit, Eric

    2016-09-01

    The Accelerators meeting is organised every two years by the Accelerators division of the French Society of Physics (SFP). It brings together about 50 participants during a one-day meeting. The morning sessions are devoted to scientific presentations while the afternoon is dedicated to technical visits of facilities. This document brings together the available presentations (slides): 1 - Presentation of the Ganil - Grand accelerateur national d'ions lourds/Big national heavy-ion accelerator, Caen (Jardin, Pascal); 2 - Presentation of the Accelerators division of the French Society of Physics (Revol, Jean-Luc); 3 - Forward-looking and Prospective view (Napoly, Olivier); 4 - Accelerators at the National Institute of Nuclear and particle physics, situation, Forward-looking and Prospective view (Biarrotte, Jean-Luc); 5 - GANIL-SPIRAL2, missions and goals (Thomas, Jean Charles); 6 - The SPIRAL2 project (Petit, Eric)

  8. Analysis of qualitative interviews with online language teachers

    DEFF Research Database (Denmark)

    Levinsen, Karin; Meyer, Bente

    At the kick-off meeting in Vienna October 2005 it was agreed that partners would conduct a limited number of interviews to make an initial survey of issues that would be relevant for the production of the manual & guide. It was therefore the objective of the interviews to produce knowledge about...... technological skills specifically required for live online language teaching define need for qualification of the live online language teacher The Danish team conducted 4 semi-structured interviews with teachers. The interviews were made on the basis of an interview guide discussed by all partners in December...

  9. Art meets science: The Cosmopolitan Chicken Research Project.

    Science.gov (United States)

    Stinckens, A; Vereijken, A; Ons, E; Konings, P; Van As, P; Cuppens, H; Moreau, Y; Sakai, R; Aerts, J; Goddeeris, B; Buys, N; Vanmechelen, K; Cassiman, J J

    2015-01-01

    The Cosmopolitan Chicken Project is an artistic undertaking of renowned artist Koen Vanmechelen. In this project, the artist interbreeds domestic chickens from different countries aiming at the creation of a true Cosmopolitan Chicken as a symbol for global diversity. The unifying theme is the chicken and the egg, symbols that link scientific, political, philosophical and ethical issues. The Cosmopolitan Chicken Research Project is the scientific component of this artwork. Based on state of the art genomic techniques, the project studies the effect of the crossing of chickens on the genetic diversity. Also, this research is potentially applicable to the human population. The setup of the CC®P is quite different from traditional breeding experiments: starting from the crossbreed of two purebred chickens (Mechelse Koekoek x Poule de Bresse), every generation is crossed with a few animals from another breed. For 26 of these purebred and crossbred populations, genetic diversity was measured (1) under the assumption that populations were sufficiently large to maintain all informative SNP within a generation and (2) under the circumstances of the CCP breeding experiment. Under the first assumption, a steady increase in genetic diversity was witnessed over the consecutive generations, thus indeed indicating the creation of a "Cosmopolitan Chicken Genome". However, under the conditions of the CCP, which reflects the reality within the human population, diversity is seen to fluctuate within given boundaries instead of steadily increasing. A reflection on this might be that this is because, in humans, an evolutionary optimum in genetic diversity is reached. Key words.

  10. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  11. 76 FR 42684 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting

    Science.gov (United States)

    2011-07-19

    .... SUMMARY: The Mid-Atlantic Fishery Management Council Staff will hold a meeting of the Visioning Project Advisory Panel to discuss communications strategies and data gathering tools for the Visioning Project... project's results to develop future management actions. Although non-emergency issues not contained in...

  12. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  13. 4th meeting on advanced pulsed-neutron research on quantum functions in nano-scale materials

    International Nuclear Information System (INIS)

    2006-07-01

    Toward the worldwide realization of high-intensity pulsed neutron source, KEK (High Energy Accelerator Research Organization) proceeds the research by composing 6 research groups as neutron science initiation base to initiate new neutron science. The papers generalizing the researches for 2 years were presented at this meeting. KENS (Neutron Science Laboratory, KEK) shut down on March 22nd in 2006, and KEK will continue the research utilizing the pulsed neutron by using foreign facilities until the completion of J-PARC from now on. At international session in this meeting, the accomplishments and future prospects about the Japan-United Kingdom science and technology collaboration project, and about the research collaboration projects with IPNS (Intense Pulsed Neutron Source, ANL) and LANSCE (Los Alamos Neutron Science Center) were presented. Especially in the latter projects, the first accomplishment was reported under the present agreement. In addition, Meeting on structural study of proteins in aqueous solutions' and 'Meeting on hydrogen quantum atomics study' were held as satellite meetings. (J.P.N)

  14. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  15. Implementation of the Southwestern Oncology Group Committee on Women’s Health Research Agenda: A Special Sabbatical for the Chairperson.

    Science.gov (United States)

    1996-07-01

    the kickoff event in Chicago on: "Debunking the Myths of Clinical Trials" and the SWOG CWH members will serve as consultants to this project. The goal...sensitive perspective about the protocol and the factors which played a role in their decision to go on a protocol. They will be trained to address myths ...evaluation of the treatment. Definitions: Vaginal Dryness: Some women experience a sense of dryness, irritation, or itchiness in their vagina ; this

  16. Report of the IAEA/RCA-NDT education project

    International Nuclear Information System (INIS)

    Ooka, Kiichi; Terada, Kunio; Ohtani, Kiyoshi; Niwa, Noboru.

    1988-01-01

    The Japan Non-Destructive Test (NDT) Association has been carried out an NDT technical education project with support from IAEA. Phase I of the project was successfully completed last year. The present report briefly outlines the second five-year plan (Phase II) to be carried out under the project. The project was first established in 1981 after receiving a request from IAEA to provide NDT education for participants from the RCA countries (13 countries in Asian and Pacific area). Phase I was mainly designed to provide lectures on NDT techniques. Prior to the start of Phase II, the International Education Subcommittee was established in December 1986 to take the leadership in carrying out Phase II of the project. In addition, the NDT Expert Working Group (formally called Advisory Group) has been installed which consists of representative from Japan. Australia India and Singapore. The Group held nine meetings during Phase I. Three lecture meetings at Singapore and another three at Tokyo were held to provide education according to a plan developed by the Group. It has been decided that Japan be support the lecture meetings to be held during Phase II. To conduct such meetings, a group comprising all of the National Coordinators from the RCA countries was set up to replace the Working Group. The National Coordinator Conference was held four times since its establishment. (N.K.)

  17. Report of the IAEA/RCA-NDT education project

    Energy Technology Data Exchange (ETDEWEB)

    Ooka, Kiichi; Terada, Kunio; Ohtani, Kiyoshi; Niwa, Noboru

    1988-11-01

    The Japan Non-Destructive Test (NDT) Association has been carried out an NDT technical education project with support from IAEA. Phase I of the project was successfully completed last year. The present report briefly outlines the second five-year plan (Phase II) to be carried out under the project. The project was first established in 1981 after receiving a request from IAEA to provide NDT education for participants from the RCA countries (13 countries in Asian and Pacific area). Phase I was mainly designed to provide lectures on NDT techniques. Prior to the start of Phase II, the International Education Subcommittee was established in December 1986 to take the leadership in carrying out Phase II of the project. In addition, the NDT Expert Working Group (formally called Advisory Group) has been installed which consists of representative from Japan. Australia India and Singapore. The Group held nine meetings during Phase I. Three lecture meetings at Singapore and another three at Tokyo were held to provide education according to a plan developed by the Group. It has been decided that Japan be support the lecture meetings to be held during Phase II. To conduct such meetings, a group comprising all of the National Coordinators from the RCA countries was set up to replace the Working Group. The National Coordinator Conference was held four times since its establishment. (N.K.).

  18. 77 FR 12553 - Sunshine Act Meetings

    Science.gov (United States)

    2012-03-01

    ... COMMISSION ON CIVIL RIGHTS Sunshine Act Meetings AGENCY: United States Commission on Civil Rights... Discussion of Projects: VRA Statutory Enforcement Report Update Human Trafficking Briefing Update Immigration... Discussion on Agency Staffing V. State Advisory Committee Issues: Review of two Hawaii SAC applicants Re...

  19. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong

    Directory of Open Access Journals (Sweden)

    Joanna T. W. Chu

    2018-02-01

    Full Text Available BackgroundRecruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project—entitled the Learning Families Project—conducted in Hong Kong.MethodsIn collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned.ResultsOver a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants. Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter being more effective than passive strategies (i.e., posters and leaflets; the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects.ConclusionThe lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  20. Setting Ambitious yet Achievable Targets Using Probabilistic Projections: Meeting Demand for Family Planning.

    Science.gov (United States)

    Kantorová, Vladimíra; New, Jin Rou; Biddlecom, Ann; Alkema, Leontine

    2017-09-01

    In 2015, governments adopted 17 internationally agreed goals to ensure progress and well-being in the economic, social, and environmental dimensions of sustainable development. These new goals present a challenge for countries to set empirical targets that are ambitious yet achievable and that can account for different starting points and rates of progress. We used probabilistic projections of family planning indicators, based on a global data set and Bayesian hierarchical modeling, to generate illustrative targets at the country level. Targets were defined as the percentage of demand for family planning satisfied with modern contraceptive methods where a country has at least a 10 percent chance of reaching the target by 2030. National targets for 2030 ranged from below 50 percent of demand satisfied with modern contraceptives (for three countries in Africa) to above 90 percent (for 41 countries from all major areas of the world). The probabilistic approach also identified countries for which a global fixed target value of 75 percent demand satisfied was either unambitious or has little chance of achievement. We present the web-based Family Planning Estimation Tool (FPET) enabling national decision makers to compute and assess targets for meeting family planning demand. © 2017 The Population Council, Inc.

  1. 78 FR 44103 - Announcement of Public Meetings To Receive Comments on Draft Solicitation for Advanced Fossil...

    Science.gov (United States)

    2013-07-23

    ... Advanced Fossil Energy Projects AGENCY: U.S. Department of Energy. ACTION: Notice of public meetings to... a potential future solicitation announcement for Federal Loan Guarantees for Advanced Fossil Energy... Guarantees for Advanced Fossil Energy Projects are invited to attend any of the meetings listed in DATES. To...

  2. Astro tourism: Astro Izery project

    Science.gov (United States)

    Mrozek, Tomasz; Kołomański, Sylwester; Żakowicz, Grzegorz; Kornafel, Stanisław; Czarnecki, Tomasz L.; Suchan, Pavel; Kamiński, Zbigniew

    2015-03-01

    The Astro Izery project is carried by several institutions from Poland and Czech Republic. Its aim is to educate and inform tourists, who visit the Izery Mountains, about astronomy and light pollution. The project consists of two activities: permanent (sundials, planetary path etc.) and periodic (meetings, workshops). After five years the project is in good health and will gain more elements in next years.

  3. STANDING CONCERTATION COMMITTEE OCTOBER 1999 ORDINARY MEETING

    CERN Document Server

    1999-01-01

    Original: FrenchThe meeting was mainly devoted to the examination of the items below, to which the Committee had allocated two meetings:Preparation for the meeting of TREF on 19 November 1999The SCC took note of the agenda for that meeting which includes additional information on the long-term care insurance project, a second report on staff recruitment and retention, a status report on the voluntary programmes (especially an assessment of the Progressive Retirement Programme), a proposal for the application of the cost-of-living index for 2000, an addendum to the technical amendments to be made to the Staff Rules and Regulations, a balance sheet of CERN's apprenticeship programmes and a status report with regard to guarantees for the pensions of members of the personnel in the event of the dissolution of the Organization.Long-term care: TREF would be given further information following the comments made when the Management's initial proposals were presented to the Forum at its September meeting. The informat...

  4. 76 FR 30373 - National Institute of Allergy and Infectious Diseases; Meeting

    Science.gov (United States)

    2011-05-25

    ... Allergy and Infectious Diseases; Meeting Notice of Closed Meeting Pursuant to section 10(d) of the Federal... Infectious Diseases Special Emphasis Panel; NIAID Investigator Initiated Program Project Applications (P01... Research; 93.856, Microbiology and Infectious Diseases Research, National Institutes of Health, HHS) Dated...

  5. Fermilab History and Archives Project | Home

    Science.gov (United States)

    Special Events Early Users Meetings (1979 - 1989) The Tevatron Natural History Discoveries Technology Site Fermilab History and Archives Project Fermilab History and Archives Project Fermi National Accelerator Laboratory Home About the Archives History & Archives Online Request Contact Us Site Index

  6. Introduction to the Asian Energy Security project: Project organization and methodologies

    International Nuclear Information System (INIS)

    Hippel, David von; Savage, Timothy; Hayes, Peter

    2011-01-01

    The spectacular recent economic growth in the Asia-Pacific region in general, and in many of the economies of Northeast Asia in particular, has spurred a vast expansion in the need for energy services, and an expansion in the demand for the fuels that help to supply these services. Future projections suggest that the growth of fossil fuel use in Northeast Asia, especially in China, will have major consequences for financial and fuel markets and pollution both regionally and globally. Before the project described in this paper was initiated, there was no ongoing forum for energy experts from all of the countries of the region to meet, informally and in an unofficial capacity, to discuss openly and in a targeted fashion the energy situations in their countries, and to work together to evaluate the energy efficiency costs and benefits of different ways of meeting regional demand. The Asian Energy Security (AES) project provides such a forum, and as such constitutes a unique resource in the engagement of the countries of Northeast Asia on the topic of energy security.

  7. Magnetic Fields on the National Ignition Facility (MagNIF)

    International Nuclear Information System (INIS)

    Mason, D.; Folta, J.

    2016-01-01

    A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders' needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentally relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs - full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.

  8. Magnetic Fields on the National Ignition Facility (MagNIF)

    Energy Technology Data Exchange (ETDEWEB)

    Mason, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Folta, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-08-12

    A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentally relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.

  9. EURO HAWK Project Overview

    National Research Council Canada - National Science Library

    2003-01-01

    Briefing charts from presentation on a EURO HAWK project overview; an airborne system with stand-off capability for wide-area intelligence, surveillance and reconnaissance meeting European NATO countries' ISR requirements...

  10. A Formula for Fixing Troubled Projects: The Scientific Method Meets Leadership

    Science.gov (United States)

    Wagner, Sandra

    2006-01-01

    This presentation focuses on project management, specifically addressing project issues using the scientific method of problem-solving. Two sample projects where this methodology has been applied are provided.

  11. DTUsat the Ideal CDIO project

    DEFF Research Database (Denmark)

    Fléron, René

    2016-01-01

    -disciplinary collaboration and all the devils buried in the details of realizing any theoretical project is barely touched upon. The CDIO approach aims to simulate this and thereby prepare the students to meet the challenges of an engineering job. Whereas the standard student project at DTU involves one to three students...

  12. Final Report of the Final Meeting of Project Coordinators

    International Nuclear Information System (INIS)

    Cordero Calderon, Carlos F.

    1996-06-01

    The Costa Rican Electricity Institute has always been worried of the verification of the good state of the works and thus to guarantee their operation. For that reason, it has established different sorts of auscultation of the Arenal's Dam. Some investigations have been done to find new methods to improve and to eliminate risks in different works or projects. The Arenal's Dam is one of the greatest engineering works in Costa Rica, it has the Arenal, Corobici and Sandillal Hydroelectric Plants. Furthermore, the irrigation system in the Tempisque River Valley, in the Guanacaste province. One special characteristic of the Site of the Dam, is the near location of the Arenal Volcano, in full activity and located at 6 Km. from the dam. This report has two goals, one is the traditional permanent measurements report for the project, and the other, is to present it as a final work of the Project Arcal XVIII, to the International Atomic Energy Agency. This report analyses the geo-hydraulic, structural and topographic auscultation, as well as the activities accomplished during the ARCAL XVIII /8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, based on information gathered through the geo-chemical auscultation, until June 1996. (author).30 ills., 80 charts, 35 tabs

  13. International Meeting on Languages, Applied Linguistics and Translation

    OpenAIRE

    Guerra, Luis

    2012-01-01

    This meeting aims at providing an overview of the current theory and practice, exploring new directions and emerging trends, sharing good practice, and exchanging information regarding foreign languages, applied linguistics and translation. The meeting is an excellent opportunity for the presentation of current or previous language learning and translation projects funded by the European Commission or by other sources. Proposals are invited for one or more of the following topics, in any of t...

  14. Co-ordinated research project on comparative international studies of osteoporosis using isotope techniques. Report on the final research co-ordination meeting

    International Nuclear Information System (INIS)

    2002-01-01

    In 1994, the International Atomic Energy Agency started the five-year Co-ordinated Research Project (CRP) on Comparative International Studies of Osteoporosis Using Isotope Techniques. The objectives of this study were: To harmonize the techniques of measuring BMD within the participating countries and to obtain data that can be compared between the different study groups (countries); To determine whether early adult PBM varies between populations over the age range from 15 to 50 years. In other words, to determine the age of peak bone mass in selected populations from developing countries; To explore environmental and nutritional contributions to any determined differences. Further information about the purpose and scope of the CRP may be found in the report of the Advisory Group Meeting (AGM) held in 19921 and other reports of this CRP. The fourth Research Co-ordination Meeting (RCM) for participants of the CRP, which is the subject of the present report, was held at the University of Sheffield Medical School; WHO Collaborating Center for Metabolic Bone Diseases in Sheffield, UK from 28 Feb. to 3 March 2000

  15. 100TH ACCU MEETING

    CERN Multimedia

    2013-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 4 June 2013 at 9:15 a.m. in room 60-6-002.   1. Chairperson's remarks 2. Adoption of the agenda      3. Minutes of the previous meeting 4. 25 years of ACCU 5. News from the CERN Management 6. Report on services from GS department 7. Status of the Health Insurance Project for Users 8. Users’ Office News 9. Public WiFi at CERN 10. Reports from ACCU representatives on other Committees a. Restaurants' Supervisory Committee 11. Matters arising 12. Any Other Business 13. Agenda for the next meeting   Anyone wishing to raise any points under “Any Other Business” is invited to send them to the Chairperson in writing or by e-mail. Michael Hauschild (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Re...

  16. Expert Meeting Report: Retrofit Implementation - A Neighborhood at a Time

    Energy Technology Data Exchange (ETDEWEB)

    Griffiths, Dianne [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2012-04-01

    This report provides information about a Building America expert meeting hosted by research team Consortium for Advanced Residential Buildings (CARB) on October 25, 2011, in New York City. The meeting discussed several community residential retrofit projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing industry.

  17. Expert Meeting Report: Retrofit Implementation - A Neighborhood at a Time

    Energy Technology Data Exchange (ETDEWEB)

    Griffiths, D.

    2012-04-01

    This report provides information about a Building America expert meeting hosted by research team Consortium for Advanced Residential Buildings on October 25, 2011, in New York City. The meeting discussed several community residential retrofit projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing industry.

  18. 24 CFR 1003.303 - Project rating.

    Science.gov (United States)

    2010-04-01

    ... address the quality and cost effectiveness of the proposed project, the commitment to sustain the proposed... meets the threshold requirements shall be competitively rated within each Area ONAP's jurisdiction under... project costs. (e) Comprehensiveness and coordination. This factor will address the extent to which the...

  19. 78 FR 23960 - Annual Public Meeting

    Science.gov (United States)

    2013-04-23

    ... annual open public meeting. The Foundation will provide an overview of its history, project updates, as... p.m. Time allotted for each registrant will be 3 minutes. The contact person will notify interested... individuals interested in making formal comments should notify the contact person and submit a brief statement...

  20. Proceedings of the 49th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2015-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of several results of joint usage and collaborative researches performed in the institute. The 49th KURRI Scientific Meeting will be held for two days on January 28 and 29 in 2015. The contents of the meeting are as follows (the numbers of the right column are those of the presentations): 1) Topic lectures (4), 2) New comer lectures (1), 3) Presentations of the results of the project researches terminating this fiscal year (6), 4) Special lectures given by retiring faculty members (2), 5) Poster presentations (37). This issue is the collection of 50 papers presented at the entitled meeting. The 3 of the presented papers are indexed individually. (J.P.N.)

  1. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  2. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN. PROJECT SUMMARY

    Science.gov (United States)

    This document is an eight page summary of the final report on arsenic demonstration project at Climax, MN (EPA/600/R-06/152). The objectives of the project are to evaluate the effectiveness of the Kinetico iron removal system in removing arsenic to meet the new arsenic maximum co...

  3. 76 FR 72009 - Sunshine Act Notice-December 8, 2011 Board of Directors Meeting

    Science.gov (United States)

    2011-11-21

    .... 2. Insurance Project--Middle East and Africa. 3. Finance Project--Maghreb and North Africa. 4... Closed Session of the October 27, 2011 Board of Directors Meeting. 6. Pending Major Projects. Written summaries of the projects to be presented will be posted on OPIC's Web site on or about November 17, 2011...

  4. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE No. 98-D-453

    International Nuclear Information System (INIS)

    HOLSTEIN, W.A.

    1999-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, WA., currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration. Use of this document is described in the Project Hanford Policy and Procedure System under HNF-PRO-1999, Construction Program Conceptual Phase

  5. Barakah Project in UAE

    Energy Technology Data Exchange (ETDEWEB)

    Petrunik, K. [Emirates Nuclear Energy Corp., Abu Dhabi (United Arab Emirates)

    2014-07-01

    This paper reviews the Barakah Project in United Arab Emirates (UAE). Development of UAE nuclear power plant programme is proceeding and construction is well under way. Nuclear energy is a compelling solution to energy demand in the UAE. Economics, environment, energy security, diversification and industrial development are the key drivers of this program. The project continues ro meet construction milestones, capacity building and training on UAE Nationals.

  6. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  7. Management of water hyacinth. A CSC/UNEP project. Progress report

    International Nuclear Information System (INIS)

    1981-05-01

    The water hyacinth project was initially proposed at the Regional Workshop on Rural Technology held at Dacca in January 1978. In November 1978, national coordinators met at New Delhi and outlined the project in detail as reported in CSC(79)RT-4. The meeting was attended by delegates from Bangladesh, Egypt, Guyana, India, Malaysia, Papua New Guinea, Sri Lanka, Commonwealth Science Council and the United Nations Environment Programme. Following this a proposal was submitted to UNEP seeking funding support to meet the external cost component of the project. This support was subsequently granted. The project aims to achieve an integrated approach towards managing water hyacinth. The underlying intention was that management would cover both eradication of the plant as well as making productive use of it when possible. Productive uses envisaged include biogas synthesis, production of papers and boards and as a source of proteins. Another interesting possibility is the use of the plant to control industrial as well as domestic water pollution . All these were detailed in a three and a half year time plan. The project had its first review meeting in June 1979 in Papua New Guinea. The major intention of this meeting was to examine status reports from each country in an attempt to quantify the problem caused by water hyacinth and assess the work plan in relation to this. The report of this meeting has been published as CSC(79)RT-5. At this meeting Papua New Guinea decided to withdraw from this project as water hyacinth was not regarded as a severe problem. The use of dugong as a control agent was not recommended by Papua New Guinea. In April 1980 an interim review meeting attended by the Regional Coordinator and representatives of UNEP and CSC was held in London where, based on the progress made in the participating countries, activities and time schedules were refined and sharpened (CSC (80)RT-16). It look some time to resolve the external funding question . It was

  8. FAO/IAEA consultants' meeting on integrated approach for improving small scale market oriented dairy systems. Report

    International Nuclear Information System (INIS)

    2002-01-01

    A Consultants' Meeting was held at IAEA, Vienna from 21-24 August 2000 to discuss the need for, and to develop an FAO/IAEA Co-ordinated Research Project (CRP) to demonstrate increases in the productivity of small scale market oriented dairy systems using an integrated approach to improving nutrition, reproductive management and disease control. The meeting was attended by five consultants with expertise in specific aspects of research and development in dairy production, three external resource persons who were funded from their own institutes, a staff member of FAO's Animal Production Service, a representative of the IAEA's Department of Technical Co-operation and staff members of the Joint FAO/IAEA Division's Subprogramme on Animal Production and Health. The list of participants is given. The specific objectives of the meeting were to: Review the current research thrusts that are relevant to the objectives of the project, recommend areas that should be included and determine the most appropriate modalities for supporting these activities; Define the scientific scope of the project and recommend appropriate technologies and methods that should be applied in field and laboratory studies for obtaining the necessary information; Review the background document which has been prepared and make appropriate improvements and modifications; and Develop work plans, time scales, schedule of Research Co-ordination Meetings (RCMs) and the project framework matrix. The meeting was formally opened by Dr Martyn Jeggo, Head of the Animal Production and Health Section, who outlined the Sub-programme's mandate, medium-term strategy and how the planned CRP fits into this strategy. Dr Oswin Perera, the Scientific Secretary of the meeting, outlined the previous activities of the Sub-programme in animal nutrition and reproduction, discussed the background to the proposed project, and presented the objectives and expected outcomes of the meeting. The consultants and resource persons

  9. 42 CFR 56.603 - Project elements.

    Science.gov (United States)

    2010-10-01

    ... set forth in the most recent CSA Poverty Income Guidelines (42 CFR 1060.2) (except that nominal fees... statistical data, cost accounting, management information, and reporting or monitoring systems which will meet the project's management needs and shall enable the project to provide such statistics and other...

  10. Light Atmosphere in Hospital Wards

    DEFF Research Database (Denmark)

    Stidsen, Lone Mandrup

    by the patients in the ward. The project is based on the Danish Regulation for light in hospitals (DS703), which is a supplement to the regulation of artificial lighting in workplaces (DS700). The kick-off to the project was reading the DS703, second paragraph, chapter 2 about general requirements for lighting...... group has quite diverse needs and preferences, while the staff needs task lighting and the patient a space experienced as homely and pleasant. Categories such as ‘pleasure’ and ‘activities’ are also a part of the user aspect. The space is divided into subcategories as ‘location of the space...

  11. 7 CFR 1944.514 - Comprehensive TSA grant projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Comprehensive TSA grant projects. 1944.514 Section... § 1944.514 Comprehensive TSA grant projects. (a) The rural area to be covered by the TSA project must be...) Consideration of the following items may assist applicants develop TSA projects which meet the needs of low...

  12. DGMK spring meeting of Fachbereich Aufsuchung und Gewinnung

    International Nuclear Information System (INIS)

    2002-01-01

    The report of the meeting contains 42 articles on the subjects DGMK project ''tight gas reservoirs'', geophysics, petroleum geology, drilling technique, petroleum and natural gas transport technique and underground storage of natural gas. (UKE) [de

  13. Biomarkers: project update from the GRAPPA 2012 annual meeting.

    Science.gov (United States)

    FitzGerald, Oliver; Mease, Philip J

    2013-08-01

    For members of the Group for Research and Assessment of Psoriasis and Psoriatic Arthritis (GRAPPA), an important goal has been the identification of soluble biomarkers in psoriatic arthritis that might predict the development of radiographic progression. Work over the past year has resulted in approval of a draft protocol, and an announcement is forthcoming of the outcome of an assessment process for centers that applied to manage the project. GRAPPA is now ready to commence formal negotiations with potential funding partners and intends to initiate this project in the near future.

  14. Summary report of the third research co-ordination meeting on measurement, calculation and evaluation of photon production data

    International Nuclear Information System (INIS)

    Oblozinsky, P.

    1998-01-01

    The present report contains the account of the last meeting of the Co-ordinated Research Project on ''Measurement, Calculation and Evaluation of Photon Production Data''. In addition to the summary of the meeting, the overall results achieved under the project in 1994-1997 are summarized, including the list of publications. The status of work on the Final Report of the project is also given. (author)

  15. Proceedings of the 48th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2014-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of a part of the results of joint usage and collaborative researches performed in the institute. The 48th KURRI Scientific Meeting will be held for two days on January 30 and 31 in 2014. The contents of the meeting are as follows: 1) Topic 4, 2) New comer lectures 3, 3) Presentations of the results of the project researches terminating this fiscal year 4, 4) Special lectures given by retiring faculty members 0, 5) Poster presentations 35. We hope that this proceedings will contribute to keep records of and let the public know of research activities in the institute. This issue is the collection of 46 papers presented at the entitled meeting. The 22 of the presented papers are indexed individually. (J.P.N.)

  16. Fourth ITER negotiations meeting. Site offers from European Union and Japan join Canada's

    International Nuclear Information System (INIS)

    Rager, J.-P.

    2002-01-01

    The Fourth ITER Negotiations Meeting took place in Cadarache, France on 4-6 June, 2002. The European Union hosted the meeting, which was also attended by delegations from Canada, Japan and Russian Federation. During the Meeting the delegations informed each other of the latest developments concerning the ITER project in their respective countries. ITER potential site offers from EU and Japan were proposed

  17. Community Gardening, Neighborhood Meetings, and Social Capital

    Science.gov (United States)

    Alaimo, Katherine; Reischl, Thomas M.; Allen, Julie Ober

    2010-01-01

    This study examined associations between participation in community gardening/beautification projects and neighborhood meetings with perceptions of social capital at both the individual and neighborhood levels. Data were analyzed from a cross-sectional stratified random telephone survey conducted in Flint, Michigan (N=1916). Hierarchical linear…

  18. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  19. The ITER divertor cassette project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Tivey, R.; Akiba, M.

    2001-01-01

    The divertor ''Large Project'' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, and seeking to identify the most cost-effective manufacturing options. This paper will report the results of the divertor large project. (author)

  20. The ITER divertor cassette project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Tivey, R.; Akiba, M.

    1999-01-01

    The divertor 'Large Project' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, and seeking to identify the most cost-effective manufacturing options. This paper will report the results of the divertor large project. (author)

  1. Meeting Objectives and Relevant NDS Databases

    International Nuclear Information System (INIS)

    Simakov, S.P.

    2012-01-01

    The purpose of the meeting was to find ways to overcome the drawbacks of the NRT standard and benefit from the recent developments in primary radiation damage simulations, the Technical Meeting had the objectives to discuss: - revisiting the NRT standard with the purpose of improving it by the evaluation of uncertainties connected with recoil spectra and the energy partitioning model; - proposal of a new upgraded standard that will capture the annealing of defects in the recoil cascade on the basis of MD, BCA and other models. As an outcome of discussions, the definition of objectives and participating organisations for a new Coordinated Research Project (CRP) on this topic are expected

  2. 76 FR 5820 - Meeting Announcements: North American Wetlands Conservation Council; Neotropical Migratory Bird...

    Science.gov (United States)

    2011-02-02

    ..., 114 Stat. 593, July 20, 2000), will hold its meeting to discuss the strategic direction and management... NW., Washington, DC 20037. FOR FURTHER INFORMATION CONTACT: Michael J. Johnson, Council Coordinator...- Federal Council meets to consider wetland acquisition, restoration, enhancement, and management projects...

  3. Hybrid petacomputing meets cosmology: The Roadrunner Universe project

    International Nuclear Information System (INIS)

    Habib, Salman; Pope, Adrian; Lukic, Zarija; Daniel, David; Fasel, Patricia; Desai, Nehal; Heitmann, Katrin; Hsu, Chung-Hsing; Ankeny, Lee; Mark, Graham; Bhattacharya, Suman; Ahrens, James

    2009-01-01

    The target of the Roadrunner Universe project at Los Alamos National Laboratory is a set of very large cosmological N-body simulation runs on the hybrid supercomputer Roadrunner, the world's first petaflop platform. Roadrunner's architecture presents opportunities and difficulties characteristic of next-generation supercomputing. We describe a new code designed to optimize performance and scalability by explicitly matching the underlying algorithms to the machine architecture, and by using the physics of the problem as an essential aid in this process. While applications will differ in specific exploits, we believe that such a design process will become increasingly important in the future. The Roadrunner Universe project code, MC 3 (Mesh-based Cosmology Code on the Cell), uses grid and direct particle methods to balance the capabilities of Roadrunner's conventional (Opteron) and accelerator (Cell BE) layers. Mirrored particle caches and spectral techniques are used to overcome communication bandwidth limitations and possible difficulties with complicated particle-grid interaction templates.

  4. Conferences in historical geography – traditional interdisciplinary meetings

    Czech Academy of Sciences Publication Activity Database

    Semotanová, Eva; Chodějovská, Eva; Šimůnek, Robert

    2012-01-01

    Roč. 38, č. 1 (2012), s. 222-227 ISSN 0323-0988 R&D Projects: GA ČR(CZ) GBP410/12/G113 Institutional support: RVO:67985963 Keywords : history * historical geography * interdisciplinary meetings Subject RIV: AB - History

  5. Using and Applying Focus Groups in Climate Change Impact Assessment Projects

    Science.gov (United States)

    DeLorme, D.; Hagen, S.

    2011-12-01

    The focus group social science research method is an efficient and flexible data collection tool with broad applicability across disciplines and contexts. Through group dynamics, this interviewing approach offers strengths in gathering candid, spontaneous comments and detailed firsthand descriptions from stakeholders' perspectives. The method, which can stand alone or be integrated with other research frameworks, has much potential for helping to manage complex issues of global change. For optimal outcomes, however, careful planning and procedures are paramount. This presentation offers guidance in this regard via examples, tips, and lessons learned from a multidisciplinary NOAA-funded project: Ecological Effects of Sea Level Rise in the Northern Gulf of Mexico (EESLR-NGOM). Focus groups are a key component of the EESLR-NGOM project as they are being used to better understand coastal resource managers' operational and information behaviors and needs regarding sea level rise (SLR), erosion, and hurricane storm surge impact; to learn how to best develop and translate the project's expected scientific results into straightforward, useful, and readily-disseminated products; and to gather outreach recommendations. As part of an EESLR-NGOM project kickoff workshop, 12 coastal resource managers participated voluntarily in a focus group. A summary of findings and illustrative participant quotations will be included in the presentation. The initial focus group was productive in gaining insights into challenges and opportunities associated with a climate change project such as the EESLR-NGOM. It highlighted the importance of considering the interrelationships of natural and built environments and new avenues for resilience and sustainability. The coastal resource managers are not only end-users but also opinion leaders in their local communities who will diffuse this information widely through their networks of other potential end-users. Engaging coastal resource managers in

  6. 2014 Accelerators meeting, Grenoble

    International Nuclear Information System (INIS)

    Lucotte, Arnaud; Lamy, Thierry; De Conto, Jean-Marie; Fontaine, Alain; Revol, Jean-Luc; Nadolski, Laurent S.; Kazamias, Sophie; Vretenar, Maurizio; Ferrando, Philippe; Laune, Bernard; Vedrine, Pierre

    2014-10-01

    The Accelerators meeting is organised every two years by the Accelerators division of the French Society of Physics (SFP). It brings together about 50 participants during a one-day meeting. The morning sessions are devoted to scientific presentations while the afternoon is dedicated to technical visits of facilities. This document brings together the available presentations (slides): 1 - Presentation of the Laboratory of subatomic physics and cosmology - LPSC-Grenoble (Lucotte, Arnaud; Lamy, Thierry); 2 - Presentation of the Accelerators division of the French Society of Physics (Fontaine, Alain; Revol, Jean-Luc); 3 - Presentation of Grenoble's master diplomas in Accelerator physics (Nadolski, Laurent S.); 4 - Presentation of Paris' master diplomas in big instruments (Kazamias, Sophie); 5 - Particle accelerators and European Union's projects (Vretenar, Maurizio); 6 - French research infrastructures (Ferrando, Philippe); 7 - Coordination of accelerators activity in France (Laune, Bernard; Vedrine, Pierre)

  7. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  8. Project Administration Techniques for Successful Classroom Collaborative Writing.

    Science.gov (United States)

    Kryder, LeeAnne Giannone

    1991-01-01

    Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)

  9. Meeting Quay 2k30's requirements

    NARCIS (Netherlands)

    Wijnants, G.H.; Toorn, A. van der; Schuylenburg, M.; Heijnen, H.P.J.; Gijt, J.G. de; Molenaar, W.F.; Ligteringen, H.; Krom, A.H.M.

    2005-01-01

    The requirements that a quay design should meet in order to yield a viable port infrastructure, vary widely from flexibility due to future customers requirements to durability due to owners requirements. In a Port of Rotterdam backed project, current and future requirements have been aggregated by

  10. 18th Meeting of the IFRC Subcommittee on Atomic and Molecular Data for Fusion. Summary Report of an IAEA Technical Meeting

    International Nuclear Information System (INIS)

    Braams, B.J.

    2013-12-01

    The 18th meeting of the Subcommittee on Atomic and Molecular Data of the International Fusion Research Council (IFRC) was held on 26-27 April 2012 at IAEA Headquarters in Vienna, Austria. Activities of the Atomic and Molecular Data Unit for the period 2010-2012 were reviewed and recommendations were made for continuig activitiees in 2012-2013 and for new projects in the 2014-2015 budget cycle. The proceedings, conclusions and recommendations of the Subcommittee meeting are briefly described in this report. Specific recommendations of the Subcommittee from this meeting, as well as the report on the activities of the IAEA Atomic and Molecular Data Unit for the period May 2010 - April 2012, are also included. (author)

  11. 9th FCC-ee (TLEP) Physics Workshop

    CERN Document Server

    2015-01-01

    This is the 9th in the series of FCCee/TLEP-related workshops. It follows on from the sucessful 8th TLEP workshop that took place in Paris on 27-29 October 2014, and the FCC kick-off meeting held on 12-15 February 2014 at University of Geneva. The workshop is open to all FCC-ee /TLEP design study members, and more generally to all interested in a precision Z, W, H, top factory. The focus will be on physics and experiments at the FCC-ee, but a more general session is organized the first day (Tuesday 3 February afternoon) with presentations about the FCC design study as a whole, and on machine and physics for the FCC-ee and the FCC-hh, with synergies and complementarities. This session is aimed at a larger audience, towards improving the project visibility in Italy. It will be followed by a social dinner in the evening. The workshop starts on Tuesday at 13:30 and ends on Thursday 16:00. Registration is now open, please proceed at your earliest convenience! Please visit the FCC-ee / TLEP web site, and subscrib...

  12. 77 FR 59967 - Notice of Public Meeting: Northwest California Resource Advisory Council

    Science.gov (United States)

    2012-10-01

    ..., food and beverages. On November 15, the council meets from 8 a.m. to 2 p.m. at the King Range Project... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAN01000.L18200000.XZ0000] Notice of Public Meeting: Northwest California Resource Advisory Council AGENCY: Bureau of Land Management...

  13. Getting Ready for the Human Phenome Project

    DEFF Research Database (Denmark)

    Oetting, William S; Robinson, Peter N; Greenblatt, Marc S

    2013-01-01

    A forum of the Human Variome Project (HVP) was held as a satellite to the 2012 Annual Meeting of the American Society of Human Genetics in San Francisco, California. The theme of this meeting was "Getting Ready for the Human Phenome Project". Understanding the genetic contribution to both rare si...... for studies attempting to identify novel disease genes or causative genetic variants. Improved systems and tools that enhance the collection of phenotype data from clinicians are urgently needed. This meeting begins the HVP's effort towards this important goal....... the impact of genetic variation on disease. To this end, there needs to be a greater sharing of phenotype and genotype data. For this to occur, the many databases that currently exist will need to become interoperable to allow for the combining of cohorts with similar phenotypes to increase statistical power...

  14. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA. U.S. EPA DEMONSTRATION PROJECT AT SPRINGFIELD, OH. PROJECT SUMMARY

    Science.gov (United States)

    This document is a eight page summary of the final report on arsenic demonstration project at the Chateau Estates Mobile Home Park in Springfield, OH. The objectives of the project are to evaluate the effectiveness of AdEdge Technologies’ AD-33 media in removing arsenic to meet t...

  15. Remedial Action Programs annual meeting: Proceedings

    International Nuclear Information System (INIS)

    1988-01-01

    Within the DOE's Office of Nuclear Energy, the Office of Remedial Action and Waste Technology manages a number of programs whose purposes are to complete remedial actions at DOE facilities and sites located throughout the United States. These programs include the Surplus Facilities Management Program, the Formerly Utilized Sites Remedial Action Program, the Uranium Mill Tailings remedial Action Program and the West Valley Demonstration Project. The programs involve the decontamination and decommissioning of radioactively-contaminated structures and equipment, the disposal of uranium mill tailings, and the cleanup or restoration of soils and ground water that have been contaminated with radioactive hazardous substances. Each year the DOE and DOE-contractor staff who conduct these programs meet to exchange information and experience in common technical areas. This year's meeting was hosted by the Surplus Facilities Management Program and was held near DOE Headquarters, in Gaithersburg, Maryland. This volume of proceedings provides the record for the meeting. The proceedings consist of abstracts for each presentation made at the meeting, and the visual aids (if any) used by the speakers. The material is organized in the following pages according to the five different sessions at the meeting: Session 1: Environmental Compliance--Policy; Session 2: Environmental Compliance--Practice; Session 3: Reports from working groups; Session 4: DandD Technology; and Session 5: Remedial Action Technology. The agenda for the meeting and the list of meeting registrants are provided in Appendix A and B, respectively. Individual papers are processed separately for the data base

  16. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  17. University Research Consortium annual review meeting program

    International Nuclear Information System (INIS)

    1996-07-01

    This brochure presents the program for the first annual review meeting of the University Research Consortium (URC) of the Idaho National Engineering Laboratory (INEL). INEL is a multiprogram laboratory with a distinctive role in applied engineering. It also conducts basic science research and development, and complex facility operations. The URC program consists of a portfolio of research projects funded by INEL and conducted at universities in the United States. In this program, summaries and participant lists for each project are presented as received from the principal investigators

  18. University Research Consortium annual review meeting program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This brochure presents the program for the first annual review meeting of the University Research Consortium (URC) of the Idaho National Engineering Laboratory (INEL). INEL is a multiprogram laboratory with a distinctive role in applied engineering. It also conducts basic science research and development, and complex facility operations. The URC program consists of a portfolio of research projects funded by INEL and conducted at universities in the United States. In this program, summaries and participant lists for each project are presented as received from the principal investigators.

  19. Sixth users meeting for the Advanced Photon Source: Proceedings

    International Nuclear Information System (INIS)

    1994-12-01

    Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project, advances in synchrotron radiation applications, and technical developments at the APS. The actions taken at the 1994 Business Meeting of the Advanced Photon Source Users Organization are also documented here

  20. Sixth users meeting for the Advanced Photon Source: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project, advances in synchrotron radiation applications, and technical developments at the APS. The actions taken at the 1994 Business Meeting of the Advanced Photon Source Users Organization are also documented here.

  1. 2D Presentation Techniques of Mind-maps for Blind Meeting Participants.

    Science.gov (United States)

    Pölzer, Stephan; Miesenberger, Klaus

    2015-01-01

    Mind-maps, used as ideation technique in co-located meetings (e.g. in brainstorming sessions), which meet with increased importance in business and education, show considerably accessibility challenges for blind meeting participants. Besides an overview of general aspects of accessibility issues in co-located meetings, this paper focuses on the design and development of alternative non-visual presentation techniques for mind-maps. The different aspects of serialized presentation techniques (e.g. treeview) for Braille and audio rendering and two dimensional presentation techniques (e.g. tactile two dimensional array matrix and edge-projection method [1]) are discussed based on the user feedback gathered in intermediate tests following a user centered design approach.

  2. Proceedings of the 50th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2016-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of several results of joint usage and collaborative researches performed in the institute. The 50th KURRI Scientific Meeting will be held for two days on January 27th and 28th, 2016. The contents of the meeting are as follows (the numbers of the right column are those of the presentations): 1) Topic lectures (3), 2) New corner lectures (2), 3) Presentations of the results of the project researches terminating this fiscal year (2), 4) Special lectures given by retiring faculty members (3), 5) Poster presentations (41). We hope that this proceedings book will contribute to keep records of and let the public know of research activities in the institute. (author)

  3. Fiscal 1991 report on the brown coal liquefaction section meeting; 1991 nendo kattan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    At the 1st through 5th brown coal liquefaction group meetings held for the fiscal year, reports are delivered and discussions are made about the progress of research and development. At the 1st meeting, a fiscal 1991 brown coal liquefaction research plan is introduced, and discussed. At the 2nd meeting, an interim report on the brown coal liquefaction technology development project is discussed. At the 3rd meeting (a joint meeting of the brown coal and bituminous coal liquefaction groups), an agendum entitled 'what the development of brown/bituminous coal liquefaction technologies for the 21st century should be' is reported, and discussed. At the 4th meeting, reports are made on the results of deliberation at the Industrial Technology Council, progress of the follow-up study, progress of the collection of achievements, and so forth. At the 5th meeting, the outline of the follow-up study, the collection of achievements in the pilot plant study (a project report preparation schedule and materials evaluation), the progress of pilot plant dismantling work, etc., are reported and discussed. (NEDO)

  4. Fiscal 1991 report on the brown coal liquefaction section meeting; 1991 nendo kattan ekika bukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    At the 1st through 5th brown coal liquefaction group meetings held for the fiscal year, reports are delivered and discussions are made about the progress of research and development. At the 1st meeting, a fiscal 1991 brown coal liquefaction research plan is introduced, and discussed. At the 2nd meeting, an interim report on the brown coal liquefaction technology development project is discussed. At the 3rd meeting (a joint meeting of the brown coal and bituminous coal liquefaction groups), an agendum entitled 'what the development of brown/bituminous coal liquefaction technologies for the 21st century should be' is reported, and discussed. At the 4th meeting, reports are made on the results of deliberation at the Industrial Technology Council, progress of the follow-up study, progress of the collection of achievements, and so forth. At the 5th meeting, the outline of the follow-up study, the collection of achievements in the pilot plant study (a project report preparation schedule and materials evaluation), the progress of pilot plant dismantling work, etc., are reported and discussed. (NEDO)

  5. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  6. Forty-Fourth Meeting of the Technical Working Group on Fast Reactors (TWG-FR). Working Material

    International Nuclear Information System (INIS)

    2011-01-01

    The objectives of the meeting were to: - Exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); - Review the progress since the 43rd TWG-FR Annual Meeting, including the status of the actions; - Consider topical technical meeting arrangements for 2012-2013, as well as review FR-related activities included in the IAEA Project&Budget (P&B) biennium 2012-2013; - Review the IAEA’s ongoing information exchange and coordinated research projects in the technical fields relevant to the TWG-FR (FRs and ADS), as well as coordination of the TWG-FR’s activities with other organizations and international initiatives (GIF, INPRO, NEA, ESNII, etc.)

  7. Senior Project: Mentoring--The Art of Becoming. [Videotape].

    Science.gov (United States)

    Southeastern Regional Vision for Education (SERVE), Tallahassee, FL.

    Mentoring is an integral part of SERVE's Senior Project program. Mentors provide support and guidance to students as they complete the requirements of Senior Project by meeting with them to offer input on their research papers and assistance with the design and implementation of their projects. Approximately 100 schools in SERVE's 6-state region…

  8. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  9. Proceedings of the first meeting of IEA, Bioenergy, Task 17

    Energy Technology Data Exchange (ETDEWEB)

    Christersson, L.; Ledin, S. [eds.

    1999-07-01

    The present proceedings are the result of the first meeting of Task 17 within the frame of IEA, Bioenergy. During the meeting the objectives of Task 17 were discussed and determined to be: * to stimulate the full-scale implementation of energy crops in participating countries; * to strengthen the contacts and co-operation between participating countries, scientists, biomass producers, machine developers, entrepreneurs, and end users; * to select the most urgent research and development areas, and to suggest projects of co-operation; * to deliver Proceedings from the meetings, and * to inform Ex-Co-members. Separate abstracts have been prepared for all the 7 papers presented.

  10. Proceedings of the 47th KURRI scientific meeting

    International Nuclear Information System (INIS)

    2013-01-01

    Kyoto University Research Reactor Institute (KURRI) has held a scientific meeting about late January every year. The purpose of the meeting is to inform the public as well as researchers in and outside the institute mainly of a part of the results of joint usage and collaborative researches performed in the institute. The 47th KURRI Scientific Meeting will be held for two days on January 29 and 30 in 2013. The contents of the meeting are as follows: 1) Topic lectures (4), 2) New comer lectures (2), 3) Presentations of the results of the project researches terminating this fiscal year (1), 4) Special lectures given by retiring faculty members (4), 5) Poster presentations (35). (The numbers in the right column are those of the presentations). We hope that this proceedings will contribute to keep records of and let the public know of the research activities in the institute. From this issue, the proceedings are published as a KUR series. The 39 of 46 papers presented at the entitled meeting are indexed individually. (J.P.N.)

  11. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  12. Summary Report of Third Research Coordination Meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Gunsing, Frank; Otsuka, Naohiko

    2010-12-01

    The Third Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) Coordinated Research Project (CRP) was held at IAEA Headquarters in Vienna from 19 to 22 October 2010. A summary of the presentation, and the discussions which took place during the meeting, are reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. The Third Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) Coordinated Research Project (CRP) was held at IAEA Headquarters in Vienna from 19 to 22 October 2010. A summary of the presentation, and the discussions which took place during the meeting, are reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. (author)

  13. ICFA: Protvino meeting looks at trends in international collaboration

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1991-01-15

    International collaboration is the lifeblood of Big Science, and in high energy physics the triennial 'Future Perspectives' meeting organized by the International Committee for Future Accelerators (ICFA) provides a valuable opportunity to reappraise trends in this collaboration. The latest meeting was held in October at Protvino, near Moscow, where the Institute for High Energy Physics is the scene of construction work for the 21-kilometre UNK proton rings and the projected home of a big new linear collider for electrons and positrons.

  14. Biases in Project Escalation : Names, frames & construal levels

    NARCIS (Netherlands)

    N. Benschop (Nick)

    2016-01-01

    markdownabstractSummary The importance of information systems to organizations continues to grow. Large sums of money are invested in information system (IS) projects. However, many IS projects fail to meet their targets or even fail completely. In the effort to successfully control such

  15. Project PROBE, 1985-1986. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In its second year of operation, Project PROBE (Professions Oriented Bilingual Education) experienced difficulty in meeting some of its instructional objectives. The project had sought to provide instructional and supportive services to 200 Spanish-speaking students from Latin America at Louis D. Brandeis High School (Manhattan, New York) and to…

  16. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  17. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  18. Semi-Annual Report on Work Supporting the International Forum for Reactor Aging Management (IFRAM)

    International Nuclear Information System (INIS)

    Bond, Leonard J.; Brenchley, David L.

    2011-01-01

    During the first six months of this project, Pacific Northwest National Laboratory has provided planning and leadership support for the establishment of the International Forum for Reactor Aging Management (IFRAM). This entailed facilitating the efforts of the Global Steering Committee to prepare the charter, operating guidelines, and other documents for IFRAM. It also included making plans for the Inaugural meeting and facilitating its success. This meeting was held on August 4 5, 2011, in Colorado Springs, Colorado. Representatives from Asia, Europe, and the United States met to share information on reactor aging management and to make plans for the future. Professor Tetsuo Shoji was elected chairperson of the Leadership Council. This kick-off event transformed the dream of an international forum into a reality. On August 4-5, 2011, IFRAM began to achieve its mission. The work completed successfully during this period was built upon important previous efforts. This included the development of a proposal for establishing IFRAM and engaging experts in Asia and Europe. The proposal was presented at Engagement workshops in Seoul, Korea (October 2009) and Petten, The Netherlands (May 2010). Participants in both groups demonstrated strong interest in the establishment of IFRAM. Therefore, the Global Steering Committee was formed to plan and carry out the start-up of IFRAM in 2011. This report builds on the initial activities and documents the results of activities over the last six months.

  19. Semi-Annual Report on Work Supporting the International Forum for Reactor Aging Management (IFRAM)

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Leonard J.; Brenchley, David L.

    2011-11-30

    During the first six months of this project, Pacific Northwest National Laboratory has provided planning and leadership support for the establishment of the International Forum for Reactor Aging Management (IFRAM). This entailed facilitating the efforts of the Global Steering Committee to prepare the charter, operating guidelines, and other documents for IFRAM. It also included making plans for the Inaugural meeting and facilitating its success. This meeting was held on August 4 5, 2011, in Colorado Springs, Colorado. Representatives from Asia, Europe, and the United States met to share information on reactor aging management and to make plans for the future. Professor Tetsuo Shoji was elected chairperson of the Leadership Council. This kick-off event transformed the dream of an international forum into a reality. On August 4-5, 2011, IFRAM began to achieve its mission. The work completed successfully during this period was built upon important previous efforts. This included the development of a proposal for establishing IFRAM and engaging experts in Asia and Europe. The proposal was presented at Engagement workshops in Seoul, Korea (October 2009) and Petten, The Netherlands (May 2010). Participants in both groups demonstrated strong interest in the establishment of IFRAM. Therefore, the Global Steering Committee was formed to plan and carry out the start-up of IFRAM in 2011. This report builds on the initial activities and documents the results of activities over the last six months.

  20. HANDI 2000 project execution plan

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  1. The Halden Reactor Project workshop meeting on control room development

    International Nuclear Information System (INIS)

    Miberg, Ann Britt; Green, Marie; Haukenes, Hanne; Larsen, Marit; Seim, Lars Aage; Veland, Oeystein

    1999-03-01

    The 'Control Room Development' workshop was organised in. Halden, November 5-6, 1998. The purpose of the workshop was to bring forward recommendations for the future use of HAMMLAB with respect to control room development. The workshop comprised thirteen presentations summarising current issues and status in control room development projects and related projects. Following the presentations, five working groups were formed. The purpose of the working groups was to establish a set of recommendations for the future use of HAMMLAB. Each working group developed a set of recommendations. The outcomes of the working groups' discussions were summarised in plenum by the working group chairs. During the workshop, all participants excluding the Halden Project staff were asked to fill in a questionnaire indicating which research topics they found most interesting to pursue in future HAMMLAB research. The purpose of this report is to summarise the workshop participants' presentations, the working groups' discussions, and the recommendations given by the workshop participants concerning the future use of HAMMLAB (author) (ml)

  2. Developing and evaluating a meeting assistant test bed

    NARCIS (Netherlands)

    Post, W.M.; Lincoln, M.

    2008-01-01

    A test bed has been developed in which participants are tasked to work in simulated, scenario based, projects in which face-to-face and remote meetings of about 45 minutes have to be held. Measures on performance, team factors and remote aspects are automatically collected with electronic

  3. The Oregon Applied Academics Project: Final Report

    Science.gov (United States)

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  4. 78 FR 17634 - Agenda and Notice of Public Meetings of the Colorado Advisory Committee

    Science.gov (United States)

    2013-03-22

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that an orientation meeting... Room, Denver, CO 80202. The meetings are to conduct an orientation and for project planning. Members of... Regional Office at 303-866-1040. Persons needing accessibility services should contact the Rocky Mountain...

  5. ICFA: Protvino meeting looks at trends in international collaboration

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    International collaboration is the lifeblood of Big Science, and in high energy physics the triennial 'Future Perspectives' meeting organized by the International Committee for Future Accelerators (ICFA) provides a valuable opportunity to reappraise trends in this collaboration. The latest meeting was held in October at Protvino, near Moscow, where the Institute for High Energy Physics is the scene of construction work for the 21-kilometre UNK proton rings and the projected home of a big new linear collider for electrons and positrons

  6. Craniofacial morphology in unoperated infants with isolated cleft palate. A cephalometric analysis in three projections

    DEFF Research Database (Denmark)

    Hermann, N.V.; Kreiborg, S.; Jensen, B.L.

    58th Annual Meeting of the American Cleft Palate-Craniofacial Association, Minneapolis, Craniofacial morphology, unoperated infants, isolated cleft palate, cephalometric analysis, three projections......58th Annual Meeting of the American Cleft Palate-Craniofacial Association, Minneapolis, Craniofacial morphology, unoperated infants, isolated cleft palate, cephalometric analysis, three projections...

  7. 77 FR 43344 - Notice of ACHP Quarterly Business Meeting

    Science.gov (United States)

    2012-07-24

    ... ADVISORY COUNCIL ON HISTORIC PRESERVATION Notice of ACHP Quarterly Business Meeting AGENCY: Advisory Council on Historic Preservation. ACTION: Notice. SUMMARY: Notice is hereby given that the... Program Comment on Bridges D. Executive Order on Infrastructure Projects VII. New Business VIII. Adjourn...

  8. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  9. 77 FR 68102 - Programs and Research Projects Affecting the Arctic; 99th Meeting

    Science.gov (United States)

    2012-11-15

    ...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... planning to attend who requires special accessibility features and/or auxiliary aids, such as sign language...

  10. Expert Meeting Report: Transforming Existing Buildings through New Media - An Idea Exchange

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Stacy [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-05-01

    This report describes results of a Building America expert meeting on September 13, 2011, in Las Vegas, Nevada, hosted by the Building America Retrofit Alliance (BARA). This meeting provided a forum for presentations and discussions on the use of new media to work with remodelers and retrofit projects to improve energy efficiency and deliver research results from the Building America program to remodelers.

  11. Expert Meeting Report: Transforming Existing Buildings through New Media--An Idea Exchange

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, S.

    2012-05-01

    This report describes results of a Building America expert meeting on September 13, 2011, in Las Vegas, Nevada, hosted by the Building America Retrofit Alliance (BARA). This meeting provided a forum for presentations and discussions on the use of new media to work with remodelers and retrofit projects to improve energy efficiency and deliver research results from the Building America program to remodelers.

  12. 44 CFR 78.11 - Minimum project eligibility criteria.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  13. Twenty Years on: Reflections on the CEDISYS Project

    DEFF Research Database (Denmark)

    Boudol, Gerard; Castellani, Ilaria; Hennessy, Matthew

    2008-01-01

    We recall some memories of the Esprit Basic Research Action CEDISYS, a small, well-focussed and fruitful project which brought together researchers at the meeting point of true concurrency and process algebra, in the period 1988-1991. The project was initiated and effectively animated by Ugo...

  14. Getting ready for the Human Phenome Project: the 2012 forum of the Human Variome Project.

    Science.gov (United States)

    Oetting, William S; Robinson, Peter N; Greenblatt, Marc S; Cotton, Richard G; Beck, Tim; Carey, John C; Doelken, Sandra C; Girdea, Marta; Groza, Tudor; Hamilton, Carol M; Hamosh, Ada; Kerner, Berit; MacArthur, Jacqueline A L; Maglott, Donna R; Mons, Barend; Rehm, Heidi L; Schofield, Paul N; Searle, Beverly A; Smedley, Damian; Smith, Cynthia L; Bernstein, Inge Thomsen; Zankl, Andreas; Zhao, Eric Y

    2013-04-01

    A forum of the Human Variome Project (HVP) was held as a satellite to the 2012 Annual Meeting of the American Society of Human Genetics in San Francisco, California. The theme of this meeting was "Getting Ready for the Human Phenome Project." Understanding the genetic contribution to both rare single-gene "Mendelian" disorders and more complex common diseases will require integration of research efforts among many fields and better defined phenotypes. The HVP is dedicated to bringing together researchers and research populations throughout the world to provide the resources to investigate the impact of genetic variation on disease. To this end, there needs to be a greater sharing of phenotype and genotype data. For this to occur, many databases that currently exist will need to become interoperable to allow for the combining of cohorts with similar phenotypes to increase statistical power for studies attempting to identify novel disease genes or causative genetic variants. Improved systems and tools that enhance the collection of phenotype data from clinicians are urgently needed. This meeting begins the HVP's effort toward this important goal. © 2013 Wiley Periodicals, Inc.

  15. 76 FR 55703 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings...

    Science.gov (United States)

    2011-09-08

    ..., and physical and cyber security systems. The new JOC also must meet State essential service criteria... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings for the Joint Operations Center Relocation Project...

  16. 77 FR 42482 - Reports and Updates on Arctic Research Programs and Projects; Meetings

    Science.gov (United States)

    2012-07-19

    ..., filing of petitions and applications and agency #0;statements of organization and functions are examples... needs in advance of the meeting. Contact person for further information: John Farrell, Executive...

  17. Proceedings of the fourth users meeting for the advanced photon source

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The Fourth Users Meeting for the Advanced Photon Source (APS) was held on May 7--8, 1991 at Argonne National Laboratory. Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project; critical issues for APS operation; advances in synchrotron radiation applications; users perspectives, and funding perspectives. The actions taken at the 1991 Business Meeting of the Advanced Photon Source Users Organization are also documented.

  18. Proceedings of the fourth users meeting for the advanced photon source

    International Nuclear Information System (INIS)

    1992-02-01

    The Fourth Users Meeting for the Advanced Photon Source (APS) was held on May 7--8, 1991 at Argonne National Laboratory. Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project; critical issues for APS operation; advances in synchrotron radiation applications; users perspectives, and funding perspectives. The actions taken at the 1991 Business Meeting of the Advanced Photon Source Users Organization are also documented

  19. Yucca Mountain Project bibliography, January--June 1989

    International Nuclear Information System (INIS)

    Henline, D.M.; Bales, J.D.

    1990-03-01

    This update contains information on the Yucca Mountain Project that was added to the Energy Data Base (EDB) during the first six months of 1989. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. The update is categorized by principal project participant organizations, and items are arranged in chronological order according to publication date. Participant-sponsored subcontractor reports, meeting papers, and journal articles are included with sponsoring organization

  20. Use of a structured template to facilitate practice-based learning and improvement projects.

    Science.gov (United States)

    McClain, Elizabeth K; Babbott, Stewart F; Tsue, Terance T; Girod, Douglas A; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg

    2012-06-01

    The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008-2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level.

  1. Studying Student Benefits of Assigning a Service-Learning Project Compared to a Traditional Final Project in a Business Statistics Class

    Science.gov (United States)

    Phelps, Amy L.; Dostilio, Lina

    2008-01-01

    The present study addresses the efficacy of using service-learning methods to meet the GAISE guidelines (http://www.amstat.org/education/gaise/GAISECollege.htm) in a second business statistics course and further explores potential advantages of assigning a service-learning (SL) project as compared to the traditional statistics project assignment.…

  2. EXPLORING PROJECT-RELATED FACTORS THAT INFLUENCE LEADERSHIP STYLES AND THEIR EFFECT ON PROJECT PERFORMANCE: A CONCEPTUAL FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Suzaan Pretorius

    2017-12-01

    Full Text Available It is widely accepted that project leaders should adapt their behaviour to meet the unique leadership demands of a variety of situations. Recently, vertical, shared, and horizontal styles of leadership have gained prominence, especially in the project management literature. Several factors are believed to play a role in determining an appropriate balance between these leadership styles. This theoretical study explores the influence of project types, the stage in the project life cycle, organisational project management maturity, and the level of trust and collaboration between project team members on the appropriate balance of leadership styles in projects. This paper presents a conceptual framework of these factors, while empirical results will be reported on in the sequel to this paper.

  3. 77 FR 42751 - Advisory Committee for Women's Services; Notice of Meeting

    Science.gov (United States)

    2012-07-20

    ... Project Launch and the Fetal Alcohol Syndrome Disorder Center for Excellence and discussions regarding... Microsoft Office 2007 Live Meeting. Interested persons may present data, information, or views, orally or in...

  4. 76 FR 26252 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting

    Science.gov (United States)

    2011-05-06

    ... development, University of Maryland MSE Study, Surfclam Ocean Quahog Excessive Share Project, and ACL/AM... meeting date. Dated: May 3, 2011. Tracey L. Thompson, Acting Director, Office of Sustainable Fisheries...

  5. Nineteenth International Microgravity Measurements Group Meeting

    Science.gov (United States)

    DeLombard, Richard (Compiler)

    2000-01-01

    The Microgravity Measurements Group meetings provide a forum for an exchange of information and ideas about various aspects of microgravity acceleration research in international microgravity research programs. These meetings are sponsored by the PI Microgravity Services (PIMS) project at the NASA Glenn Research Center. The 19th MGMG meeting was held 11-13 July 2000 at the Sheraton Airport Hotel in Cleveland, Ohio. The 44 attendees represented NASA, other space agencies, universities, and commercial companies; 8 of the attendees were international representatives from Japan, Italy, Canada, Russia, and Germany. Twenty-seven presentations were made on a variety of microgravity environment topics including the International Space Station (ISS), acceleration measurement and analysis results, science effects from microgravity accelerations, vibration isolation, free flyer satellites, ground testing, vehicle characterization, and microgravity outreach and education. The meeting participants also toured three microgravity-related facilities at the NASA Glenn Research Center. Contained within the minutes is the conference agenda, which indicates each speaker, the title of their presentation, and the actual time of their presentation. The minutes also include the charts for each presentation, which indicate the authors' name(s) and affiliation. In some cases, a separate written report was submitted and has been Included here

  6. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  7. Second negotiation meeting on the joint implementation of ITER

    International Nuclear Information System (INIS)

    Okumura, Y.

    2002-01-01

    The second negotiation meeting on the joint implementation of ITER was held in Tokyo(Japan) on 22-23 January 2002 to continue formal negotiations on the joint implementation of the ITER project. The delegations from Japan, European Union, Canada and Russia reached common understanding on some of the Joint Implementation Agreement (JIA) related issues. The delegations requested the Negotiators' Standing Subgroup (NSSG) to further elaborate the draft JIA and to submit second draft to the third Negotiation Meeting. The delegations accepted the revised Work Plan and Milestones for the negotiations process

  8. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  9. Meeting the energy needs of the northeast : the role for LNG

    International Nuclear Information System (INIS)

    Van der Put, J.

    2004-01-01

    This presentation outlined the role of liquefied natural gas (LNG) in meeting the energy requirements of the northeastern regions of the United States and Canada, as seen from the perspective of TransCanada. The need for LNG to meet projected growth in natural gas demand was presented in the context of a business model for TransCanada's entry into the LNG market. A plan for the successful siting and construction of import terminals in various strategic locations in the Northeast was presented. Issues surrounding supply and demand for LNG in North America, with specific reference to the Northeastern regions, were examined. Tables of existing import terminals were presented. Forecasts of demand growth were provided as well as details of natural gas transmission and power assets. A detailed description of the Fairwinds Project included existing and proposed pipelines, site descriptions and an outline of a stakeholder engagement campaign with examples of support and opposition as well as community impacts of the project. A behavioral guideline suggested that specific commitments should be made rather than generalized promises. A list of lessons learned from the Fairwinds project was also included. The potential to land LNG in Quebec was examined, with details of the rationale behind the proposed projects, shipping distance advantages and ice management. 16 figs

  10. Summary report of the 1. research co-ordination meeting on compilation and evaluation of photonuclear data for applications

    International Nuclear Information System (INIS)

    1997-04-01

    The present report contains the summary of the first Research Co-ordination Meeting on ''Compilation and Evaluation of Photonuclear Data for Applications'', held in Obninsk, Russia, from 3 to 6 December 1996. The project aims to produce a Technical Document on Photonuclear Data Library for Applications and to develop an IAEA Photonuclear Data Library. Summarized are the conclusions and recommendations of the meeting together with a detailed list of actions. Attached is the information sheet on the project, the agenda of the meeting and the list of participants along with extended abstracts of their presentations. Refs, figs, tabs

  11. 6th CTF3 Collaboration Meeting

    CERN Document Server

    2000-01-01

    The sixth CTF3 collaboration meeting was held at CERN from the 1st to the 2nd November 2000. This meeting was devoted to the CTF3 combiner ring, delay loop and transfer lines, with the participation of members of the CLIC study group at CERN and of collaborators from INFN-Frascati. The CTF3 status has been summarized by the project leader, and several members of the INFN-Frascati group have presented an overview of the design activity of the different components. Working group sessions have been held on beam optics, on diagnostics and equipment and on RF deflectors. The main conclusions from the working groups have been reported at the end of the meeting. Issues that have been addressed include prototype design and construction (RF deflectors, path-length tuning wigglers, extraction kicker and vacuum chamber sections) and deadlines for component specifications. The impedance budget for the ring, delay loop and transfer lines, its impact on the choice of beam-position monitors and the problem of beam stability...

  12. Role and future subjects of support project 'research activity on radiation etc. by high school students'

    International Nuclear Information System (INIS)

    Iimoto, Takeshi; Fujimoto, Noboru; Nakamura, Takashi

    2014-01-01

    This is a report of the project of MEXT(The Ministry of Education, Culture, Sports, Science and Technology) to support high school students researching radiation etc. This subject research consists of an exchange meeting, independence research, and a presentation meeting of the results. Media introduced the project and this was a very reputable project. However, regrettably this support project was broken off in the business year of 2012. In this document, the outline of the support project for seven years is introduced and the possibility of future deployment is discussed. (author)

  13. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  14. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  15. Indico MEETING tutorial

    CERN Multimedia

    CERN. Geneva; Manzoni, Alex Marc; Dimou, Maria

    2017-01-01

    This short tutorial explains how to create a MEETING in indico, how to populate the timetable, write minutes and how to add material. If you are only interested in the timetable part, please slide to 03.39, for the minutes to 07.46 and for adding material to 08.29.   Tell us what you think via e-learning.support at cern.ch More tutorials in the e-learning collection of the CERN Document Server (CDS) http://cds.cern.ch/collection/E-learning%20modules?ln=en All info about the CERN rapid e-learning project is linked from http://twiki.cern.ch/ELearning  

  16. MANAGEMENT BOARD MEETING OF 20 MAY 1999

    CERN Document Server

    1999-01-01

    For informationOutcome of the May Meeting of the Scientific Policy CommitteeThe Director-General reported that the Scientific Policy Committee had extensively examined the draft medium-term plan 'The Scientific Activities of CERN and Budget Estimates for the Years 2000-2003' at its meeting on 10 May and that a final version taking account of observations made was now being prepared for submission to the Council at its June session for approval. In addition, following detailed discussion of a written proposal concerning the long-baseline neutrino beam from CERN to Gran Sasso, the NGS facility, the Committee had expressed support for the project and was preparing a recommendation to be presented to the Committee of Council the following month.Preparation for the June Meetings of the Scientific Policy Committee, Finance Committee and Committee of Council and for the June Council SessionThe Director-General outlined the main issues to be addressed by the Council and its committees in June. In addition to the two ...

  17. MANAGEMENT BOARD MEETING OF 30 SEPTEMBER 1999

    CERN Multimedia

    1999-01-01

    For informationOutcome of the September meetings of the Scientific Policy Committee, Finance Committee and Committee of Council.The Management Board's September meeting was mainly devoted to a review of the recent meetings of the Scientific Policy Committee, Finance Committee and Committee of Council. The Director-General reported on the following highlights:LHC Status ReportStatus reports on the LHC machine presented by L. Evans, the LHC Project Leader, had been well received by the Scientific Policy Committee and Committee of Council, which had expressed satisfaction at the progress made. Informing them of an accident that had occurred during the testing of the first long LHC dipole as an illustration of problems encountered and successfully overcome, Dr Evans had explained that sparking in the 15-m dipole had resulted in significant external damage and an unprotected quench. After re-tuning, however, the magnet had been successfully re-powered to reach well above the nominal field at first quench, thus dem...

  18. Analysis of Nordic educational projects designed to meet challenges in society

    DEFF Research Database (Denmark)

    Liveng, Anne; Manninen, Jyri; Àrnason, Hróbjartur

    , process or structure identified in the successful projects: 1.Networking: Planning, implementation and development of the programme is based on networking of various - and even unexpected - organizations and players/participants. 2.Process evaluation: Continuous project development, documentation...... and analysis of results is inte-grated in the project, using Process Evaluation or Action Research 3.Flexibility: Programme offers flexible access and participation, individualized content or individualized study methods (ICT) 4.Focus on needs: A programme focuses on authentic regional, sectorial or individual...... learning providers, trade unions and other agencies supporting human development to create learning inter-ventions to address specific crisis, challenges or changes. In view of recent crises experienced by the Nordic countries The Education and Training Service Centre in Ice-land (www.frae.is) proposed...

  19. 76 FR 37805 - Progress Energy Carolinas; Notice of Meeting

    Science.gov (United States)

    2011-06-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206-030] Progress Energy Carolinas; Notice of Meeting On May 31, 2011, Progress Energy Carolinas (Progress Energy), licensee for the... National Marine Fisheries Service (NMFS) and staff to discuss what is needed to complete formal...

  20. 39 CFR 6.1 - Regular meetings, annual meeting.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Regular meetings, annual meeting. 6.1 Section 6.1 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE MEETINGS (ARTICLE VI) § 6.1 Regular meetings, annual meeting. The Board shall meet regularly on a schedule...

  1. Technical aspects of atomic and molecular data processing and exchange. 19. meeting of the A+M Data Centres and ALADDIN Network. Summary report of an IAEA technical meeting

    International Nuclear Information System (INIS)

    Humbert, D.

    2008-05-01

    The proceedings of the IAEA Technical Meeting on Technical Aspects of Atomic and Molecular Data Processing and Exchange (19th Meeting of A+M Data Centres and ALADDIN Network), held on 3-5 October, 2007 in Vienna, Austria, are briefly described. Conclusions and recommendations are presented concerning various proposed projects and their priorities involving A+M data compilation and evaluation and technical aspects of data processing, exchange, and distribution. (author)

  2. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  3. HIFS VNL Monthly Progress Report Preparation for NDCX-II Project

    International Nuclear Information System (INIS)

    Logan, Grant; Kwan, Joe; Barnard, John; Friedman, Alex; Gilson, Erik; Leitner, Matthaeus; Waldron, Will; Bieniosek, Frank

    2009-01-01

    In preparation for the project and for anticipated review in August, the HIFS-VNL hosted an NDCX-II Advisory Meeting at LBNL on May 27, 2009. A number of experts in accelerator physics, engineering, and construction were asked to visit for a full day, listen to presentations on the project, its goals, and its status, and to offer their advice on how best to proceed, what topics needed attention, and what technical options seemed most attractive to them. This was a productive meeting, and the Committee's comments will provide useful guidance.

  4. HB-Line Special Nuclear Material Campaigns: Model-Based Project Management

    International Nuclear Information System (INIS)

    CHANG, ROBERT

    2004-01-01

    This study is to show how a model was used to enable management to better estimate production capabilities to ensure contract milestones/commitments are met, to cope with fast changing project baselines and project missions, to ensure the project will meet the negotiated throughput, and to eliminate unnecessary but costly design changes

  5. Linking pre-meeting communication to meeting effectiveness

    NARCIS (Netherlands)

    Allen, J.A.; Lehmann-Willenbrock, N.K.; Landowski, N.

    2014-01-01

    Purpose – The purpose of this paper is to investigate the importance of communication that occurs just before workplace meetings (i.e. pre-meeting talk). The paper explores how four specific types of pre-meeting talk (small talk, work talk, meeting preparatory talk, and shop talk) impact

  6. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    Science.gov (United States)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  7. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  8. International Working Group on Life Management of Nuclear Power Plants regular meeting. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    The aim of this meeting is to review the IWG activities in 1992-1993, other relevant activities, national programmes, projects of international organizations and provide recommendations of the Agency's activities, forward programmes in this area, priority scope and content of publications and meetings to be organized and sponsored by the Agency. Refs, figs and tabs

  9. 75 FR 33576 - Tehama County Resource Advisory Committee; Meeting

    Science.gov (United States)

    2010-06-14

    ... (RAC) will meet in Red Bluff, California. Agenda items to be covered include: (1) Introductions; (2) approval of minutes; (3) public comment; (4) Chairman's perspective; (5) project presentations; (6) next.... Individuals wishing to speak or propose agenda items must send their names and proposals to Randy Jero...

  10. Regenerating America: Meeting the Challenge of Building Local Economies.

    Science.gov (United States)

    Gabel, Medard; And Others

    The document includes five papers on the implications and applications of regeneration by the Regeneration Project, based in Emmaus, Pa. The first paper, "Regenerating America: Meeting the Challenge of Building Local Economies," (Medard Gabel) defines regeneration as economic recovery and growth, fostered by diversification within a…

  11. Expert Meeting Report. Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A. [NAHB Research Center, Upper Marlboro, MD (United States); Wiehagen, J. [NAHB Research Center, Upper Marlboro, MD (United States)

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic focused on efforts to increase the efficiency of existing homes, specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  12. Meetings and meeting modeling in smart surroundings

    NARCIS (Netherlands)

    op den Akker, Hendrikus J.A.; Heylen, Dirk K.J.; Nijholt, Antinus; Nishida, T.

    2004-01-01

    In this paper we survey our research on smart meeting rooms and its relevance for augmented reality meeting support and virtual reality generation of meetings in real-time or off-line. Intelligent real-time and off-line generation requires understanding of what is going on during a meeting. The

  13. Treatment Algorithm for the Hypertension Specialist after the Milan Meeting in 2007

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    2007-01-01

    Roč. 30 (2007), s. 374-374 ISSN 1420-4096. [Central European Meeting on Hypertension and Cardiovascular Disease Prevention. 11.10.2007-13.10.2007, Kraków] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : hypertension specialist * treatment algorithm for the hypertension * treatment after the Milan Meeting in 2007 Subject RIV: FA - Cardiovascular Disease s incl. Cardiotharic Surgery

  14. A2e High Fidelity Modeling: Strategic Planning Meetings

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, Steven W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprague, Michael A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Womble, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barone, Matt [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    Atmosphere to electrons (A2e) is a multi-year U.S. Department of Energy (DOE) research initiative targeting significant reductions in the cost of wind energy through an improved understanding of the complex physics governing wind flow into and through whole wind farms. Better insight into the flow physics of large multi-turbine arrays will address the plant-level energy losses, is likely to reduce annual operational costs by hundreds of millions of dollars, and will improve project financing terms to more closely resemble traditional capital projects. In support of this initiative, two planning meetings were convened, bringing together professionals from universities, national laboratories, and industry to discuss wind plant modeling challenges, requirements, best practices, and priorities. This report documents the combined work of the two meetings and serves as a key part of the foundation for the A2e/HFM effort for predictive modeling of whole wind plant physics.

  15. Tenth working group meeting of representatives of RCA Member States. Report

    International Nuclear Information System (INIS)

    1989-04-01

    The Tenth RCA (Regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology) Working Group meeting of representatives of RCA Member States was held at the Chinese Academy of Agricultural Sciences, Beijing, between 11-14 April 1988. The report on the meeting consists of a presentation of the seven technical sessions which dealt with topics such as nuclear techniques in industry, agriculture and medicine, nuclear power and of the project reports under RCA

  16. Summary report of consultants' meeting on nuclear data of charged-particle interactions for medical therapy applications

    International Nuclear Information System (INIS)

    Capote Noy, R.; Vatnitskiy, S.

    2007-01-01

    A summary is given of a Consultants' Meeting assembled to assess the viability of a new IAEA Co-ordinated Research Project (CRP) on Charged-Particle Interaction Data for Radiotherapy. The need for a programme to compile and evaluate charged-particle nuclear data for therapeutic applications was strongly agreed. Both the technical discussions and the expected outcomes of such a project are described, along with detailed recommendations for implementation. The meeting was jointly organized by NAPC/Nuclear Data Section and NAHU/Dosimetry and Medical Radiation Physics Section. (author)

  17. Effect of participation in the Fadama–II project on Participants' socio ...

    African Journals Online (AJOL)

    For most respondents, the socioeconomic status changed positively following participation in the project. Majority of the respondents in the study area participated actively in fadama meetings and other activities involved in project. Benefits derived from taking part in the project were generally high for most respondents (95.5 ...

  18. 75 FR 71122 - Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review

    Science.gov (United States)

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...

  19. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  20. MANAGEMENT BOARD MEETING OF 13th MARCH 2003

    CERN Multimedia

    2003-01-01

    Status of Earned Value Management (EVM) J. Ferguson, the EVM Project Leader, reported that the concerted EVM data collection phase that had begun in January was nearing completion, with the last of the 23 groups concerned having begun the data collection process and data corresponding to over 85% of the overall LHC cost-to-completion figure now incorporated in the system. The project team was working closely with the groups that had yet to submit their full data to ensure that the exercise was completed by Easter. The period leading up to the June meetings of the Council and its committees, at which the first EVM report was due to be presented, would then be devoted to tuning the data and ensuring consistent reporting across all the groups concerned. Preparation of the March Meetings of the Council and its Committees The Director-General stated that, in addition to regular items of business, such as the approval of the 2003 Budget at 2003 prices, contract adjudications and a progress report on technology tra...

  1. Presentations and documents submitted to the 26. meeting, NEA Headquarters

    International Nuclear Information System (INIS)

    2014-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document is a compilation of the available Presentations (slides) and documents (reports) submitted to the 26. WPEC meeting: Summary record of the previous meeting, May 2013; Membership and observers - May 2014 (Participation, Informal discussions on criteria defining an 'evaluation project'); 25. Anniversary of WPEC and brief overview of WPEC history; Reports on experimental activities: Europe, Japan, USA, Russia (no presentation available), China; Brief progress reports from the evaluation projects: ENDF, JEFF, JENDL, BROND/ROSFOND (no presentation available), CENDL, IAEA, TENDL; Status of subgroups: Subgroup 27: Prompt photon production from fission products (no presentation available), Subgroup 28: Processing of covariance data, Subgroup 31: Meeting nuclear data needs for advanced reactors, Subgroup 33: Methods and issues for the combined use of integral experiments and covariance data, Subgroup 34: Coordinated evaluation of Pu-239 in the resonance region, Subgroup 35: Scattering angular distribution in the fast energy range (no presentation available), Subgroup 36: Reporting and usage of experimental data for evaluation in the resolved resonance region, Subgroup 37: Improved fission product yield evaluation methodologies, Subgroup 38: A

  2. Human Research Program 2010 Chair Standing Review Panel Meeting

    Science.gov (United States)

    Steinberg, Susan

    2011-01-01

    The 13 Human Research Program (HRP) Standing Review Panel (SRP) Chairs, and in some cases one or two additional panel members (see section XIV, roster) referred to as the Chair (+1) SRP throughout this document, met at the NASA Johnson Space Center (JSC) on December 7, 2010 to allow the HRP Elements and Projects to report on their progress over the past year, their current status, and their plans for the upcoming year based on NASA's current goals and objectives for human space exploration. A large focus of the meeting was also used to discuss integration across the HRP scientific disciplines based on a recommendation from the 2009 HRP SRP review. During the one-day meeting, each of the HRP Elements and Projects presented the changes they made to the HRP Integrated Research Plan (IRP Rev. B) over the last year, and what their top three areas of integration are between other HRP Elements/Projects. The Chair (+1) SRP spent sufficient time addressing the panel charge, either as a group or in a separate closed session, and the Chair (+1) SRP and the HRP presenters and observers, in most cases, had sufficient time to discuss during and after the presentations. The SRP made a final debriefing to the HRP Program Scientist, Dr. John B. Charles, prior to the close of the meeting on December 7, 2010. Overall, the Chair (+1) SRP concluded that most of the HRP Elements/Projects did a commendable job during the past year in addressing integration across the HRP scientific disciplines with the available resources. The Chair (+1) SRP agreed that the idea of integration between HRP Elements/Projects is noble, but believes all parties involved should have the same definition of integration, in order to be successful. The Chair (+1) SRP also believes that a key to successful integration is communication among the HRP Elements/Projects which may present a challenge. The Chair (+1) SRP recommends that the HRP have a workshop on program integration (with HRP Element/Project

  3. 76 FR 7869 - National Cancer Institute; Notice of Meeting

    Science.gov (United States)

    2011-02-11

    ... Project, Case Studies of Alternative Models to Consent for Research. Place: Hyatt Regency Bethesda, One... Liaison Group. The meeting will be open to the public, with attendance limited to space available... Carollo, MPA, Advocacy Relations Manager, Office Of Advocacy Relations, Building 31, Room 10A30, 31 Center...

  4. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  5. Nuclear based technologies for estimating microbial protein supply in ruminant livestock. Proceedings of the second research co-ordination meeting of a co-ordinated research project (phase 1)

    International Nuclear Information System (INIS)

    1999-06-01

    The Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture through its Co-ordinated Research Projects (CRPs), has been assisting national agricultural research systems in Member States to develop and apply nuclear and related techniques for improving livestock productivity. The programmes have focused on animal nutrition, animal reproduction and more recently on animal nutrition/reproduction interactions with emphasis on smallholder farming systems. The measurement of microbial protein supply to ruminant livestock has been an important area of research in ruminant nutrition. An estimate of microbial protein contribution to the intestinal protein flow is important for estimating the protein requirement of ruminant animals. Understanding the process of microbial protein synthesis has been difficult however, and due to the lack of simple and accurate methods for measuring microbial protein production in vivo, the methods used are based on complex microbial markers which require surgically prepared animals. As a result of a consultants meeting held in May 1995 to advise the Joint FAO/IAEA Division on the feasibility of using nuclear and related techniques for the development and validation of techniques for measuring microbial protein supply in ruminant animals, an FAO/IAEA Co-ordinated Research Project on Development, Standardization and Validation of Nuclear Based Technologies for Measuring Microbial Protein Supply in Ruminant Livestock for Improving Productivity was initiated in 1996, with a view to validating and adapting this technology for use in developing countries. To assist scientists participating in the CRP, a laboratory manual containing experimental protocols and methodologies for standardization and validation of the urine purine derivative technique and the development of models to suit local conditions, was published as IAEA-TECDOC-945. The present publication contains the final reports from participants in Phase 1 of the project

  6. Nuclear based technologies for estimating microbial protein supply in ruminant livestock. Proceedings of the second research co-ordination meeting of a co-ordinated research project (phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture through its Co-ordinated Research Projects (CRPs), has been assisting national agricultural research systems in Member States to develop and apply nuclear and related techniques for improving livestock productivity. The programmes have focused on animal nutrition, animal reproduction and more recently on animal nutrition/reproduction interactions with emphasis on smallholder farming systems. The measurement of microbial protein supply to ruminant livestock has been an important area of research in ruminant nutrition. An estimate of microbial protein contribution to the intestinal protein flow is important for estimating the protein requirement of ruminant animals. Understanding the process of microbial protein synthesis has been difficult however, and due to the lack of simple and accurate methods for measuring microbial protein production in vivo, the methods used are based on complex microbial markers which require surgically prepared animals. As a result of a consultants meeting held in May 1995 to advise the Joint FAO/IAEA Division on the feasibility of using nuclear and related techniques for the development and validation of techniques for measuring microbial protein supply in ruminant animals, an FAO/IAEA Co-ordinated Research Project on Development, Standardization and Validation of Nuclear Based Technologies for Measuring Microbial Protein Supply in Ruminant Livestock for Improving Productivity was initiated in 1996, with a view to validating and adapting this technology for use in developing countries. To assist scientists participating in the CRP, a laboratory manual containing experimental protocols and methodologies for standardization and validation of the urine purine derivative technique and the development of models to suit local conditions, was published as IAEA-TECDOC-945. The present publication contains the final reports from participants in Phase 1 of the project

  7. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  8. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  9. Proceedings of the second Korea-Japan meeting on neutron science

    International Nuclear Information System (INIS)

    Kamiyama, Takashi; Itoh, Shinichi

    2003-02-01

    The 2nd Korea-Japan Meeting on Neutron Science was held at KEK on 28-29th March, 2002. Forty neutron scientists from eighteen organizations (eleven Korean neutron scientists from seven organizations) participated at the meeting and shared an exciting time discussing various topics including instrumentation. The first day was devoted to the overview of the facilities in both Korea and Japan, single and powder diffraction, reflectivity and spin dynamics and magnetism. On the second day, topics on SANS and WANS, industrial application, reflectivity and instrumentation (including detectors development). Neutron facility in the high intensity proton accelerator project of Japan (J-PARC) was also introduced. This issue is the collection of the documents presented at the title meeting. (J.P.N.)

  10. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  11. Family participation in care plan meetings : Promoting a collaborative organizational culture in nursing homes

    NARCIS (Netherlands)

    Dijkstra, Ate

    In this study, the author evaluated a project in The Netherlands that aimed to promote family members' participation in care plan meetings at a psychogeriatric nursing home. The small-scale pilot project, which was conducted in four wards of the nursing home, was designed to involve families in

  12. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  13. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  14. The 1000 bull genome project

    Science.gov (United States)

    To meet growing global demands for high value protein from milk and meat, rates of genetic gain in domestic cattle must be accelerated. At the same time, animal health and welfare must be considered. The 1000 bull genomes project supports these goals by providing annotated sequence variants and ge...

  15. THE IMPORTANCE OF PROJECT MANAGEMENT IN FUNDRAISING FOR MUNICIPAL ADMINISTRATION

    Directory of Open Access Journals (Sweden)

    Ivan Coriolano Barros Durand Junior

    2014-09-01

    Full Text Available It is the constant growth of the public administration challenges in meeting the huge demand generated by the needs in education, health, housing, infrastructure and social assistance,which can rarely be met only by the usual collection of fees of the municipalities. Hence, and in order to properly document the uses of public resources, the Federal Government adopted a new instance on the release of public funds to meet the demands of the municipalities by requiring the production of projects. Thus, mechanisms have been developed in order to receive and review projects developed in municipal levels.

  16. Proceedings of Task Force Meeting "Human Factors in Innovation Management". Helsinki, 9-14 October, 1983

    OpenAIRE

    Vasko, T.; Goncharov, V.

    1984-01-01

    These proceedings from the IIASA Task Force Meeting held in Helsinki from 9-14 October, 1983 reflect the wide spectrum of interests and experiences of the participants. The main topic -- Human Factors in Innovation Management -- was singled out as a potential focus early in the life of the Innovation Management Project. Preliminary meetings had already indicated how internally structured this topic could be. Intentionally, no attempts were made to limit the scope of the meeting, as the object...

  17. Project-Based Learning in Electronic Technology: A Case Study

    Science.gov (United States)

    Li, Li

    2015-01-01

    A case study of project-based learning (PBL) implemented in Tianjin University of Technology and Education is presented. This multidiscipline project is innovated to meet the novel requirements of industry while keeping its traditional effectiveness in driving students to apply knowledge to practice and problem-solving. The implementation of PBL…

  18. International Arctic Seas Assessment Project (IASAP)

    International Nuclear Information System (INIS)

    Sjoeblom, K.L.; Linsley, G.S.

    1995-01-01

    The purpose of this paper was to give an overall view of the International Arctic Seas Assessment Project (IASAP). The IASAP project was initiated in 1993 to address concerns about the possible health and environmental impacts of radioactive wastes dumped in the shallow waters of the Arctic seas by the former Soviet Union. The project is being executed as a part of the IAEA's responsibilities under the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (London Convention 1972). The results and conclusions of the project are expected to be reported to the London Convention in late 1996. The objectives of the project are: 1) to assess the risks to human health and to the environment associated with the radioactive waste dumped in the Kara and Barents Seas; and 2) to examine possible remedial actions related to the dumped wastes and to advise on whether they are necessary and justified. The project is organized in five working areas: source terms, existing environmental concentrations, transfer mechanisms and models, impact assessment and remedial measures. Progress made in all working areas of IASAP is reviewed each year by a group of senior scientists (IASAP Advisory Group Meeting). During the first two years of the IASAP project, a considerable amount of new information has been produced and published as IASAP working documents. Experts from 15 countries and several international organizations are involved in the different Working Groups and Advisory Group Meetings of the project. It is planned that in addition to the report to the London Convention, which will be prepared by the Advisory Group, detailed technical reports covering the work of all areas of the IASAP will be produced. 12 refs., 3 figs., 1 tab

  19. Dream Team--The Case of an Undergraduate Surgical Talent Development Project

    Science.gov (United States)

    Jensen, Rune Dall; Ljungmann, Ken; Christensen, Mette Krogh; Møldrup, Ulla; Grøndal, Anne Krogh; Mogensen, Mads Filtenborg; Seyer-Hansen, Mikkel

    2016-01-01

    To be successful, a surgeon must master a variety of skills. To meet the high demand for surgical expertise, an extracurricular undergraduate project was launched. The extracurricular project consists of hands-on laparoscopic training and a mentorship programme. The project aims to find the best surgical talents among fourth-year medical students.…

  20. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  1. The Middle Eastern Regional Irrigation Management Information Systems project-update

    Science.gov (United States)

    The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...

  2. Learning Meetings and Conferences in Practice

    DEFF Research Database (Denmark)

    Elsborg, Steen; Ravn, Ib

    , Speaker's Cornered, Presentations as Interviews, A Lunch that Fosters Contacts, and Two Free Consultants. The book is based on results from the research and development project "The Learning Meeting." It was conducted by Learning Lab Denmark in collaboration with Danske Bank, Rezidor SAS Hospitality (the...... Radisson SAS hotels), Hotel Legoland, Best Western Nyborg Strand, and Odense Congress Center. This book is a translation of the authors' "Lærende møder og konferencer i praksis", People's Press, 2006....

  3. First IAEA research co-ordination meeting on 'Tritium inventory in fusion reactors'. Summary report

    International Nuclear Information System (INIS)

    Clark, R.E.H.

    2003-02-01

    The proceedings and conclusions of the first Research Co-ordination Meeting on 'Tritium Inventory in Fusion Reactors', held on November 4-6, 2002 at the IAEA Headquarters in Vienna are briefly described. This report includes a summary of the presentations made by the meeting participants and the specific goals set by the participants of the Co-ordinated Research Project (CRP). (author)

  4. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  5. The Groix and Belle-Ile floating wind turbines and their electrical connection. Information file, April 2017. Project of 'Groix and Belle-Ile floating wind turbines' and their electrical connection - Public meetings in Erdeven on 15 February 2017, Lorient on 14 February 2017, Le Palais in Belle-Ile on 12 April 2017, Groix on 13 April 2017, Quiberon 11 April 2017

    International Nuclear Information System (INIS)

    Daugeron, Thierry; Peyer, Germain; Lanne, Marc; Chabert, Christophe; Bordenave, Thomas; Mace, Herve; Brisset, Olivier; Chevreau, Gaelle

    2017-01-01

    A first document presents the Groix and Belle-Ile floating wind turbine project which is considered as a technological, ecological and industrial achievement (main figures and data, opportunities). It also presents how these wind turbines will be connected to the grid, outlines how this project will respect the natural and human environment, and to which extent consultation is at the heart of the project. Then, contents of several public meetings held about this project are reported. These public meetings comprised contributions of institutional and industrial actors, and also debates with the public

  6. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  7. Communication Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Annah (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-09-15

    The project of building a large wind farm like Lillgrund, the third largest offshore wind farm in the world, takes a considerable effort when it comes to communication and information. When the main questions 'What should be communicated?', 'To whom should this information be communicated?' and 'How should the information be communicated?' are answered, it is time to take action and actually communicate and inform. A fundamental part of the communication process is psychology. For the entrepreneur to understand that people are worried about the possible change in their living situation and deal with that is essential for how people are going to react to the plans of a potential wind farm. When Vattenfall bought the Lillgrund project a humble tone and availability were two key components in the way in which the project group approached the local residents, authorities and the general public. The goal was to achieve acceptance from the local residents and authorities and make them feel comfortable with the project and Vattenfall. Communication has been a cornerstone of the project during the whole process. A few of the activities that were carried out are media activities, open meetings for the public, exhibitions, advertisements, meetings with authorities, internal and external study visits to the site, cooperation with Malmoe city, participation in conferences and a grand opening ceremony. The basis for the activities has been the active inviting of organisations, neighbours and others. Thanks to the efforts of the whole project group and all others that were involved, the communication process was very successful. The 'Lillgrund model' will be the foundation for coming communication processes and has provided Vattenfall with a lot of experience regarding communication and information issues

  8. Third research coordination meeting on reference database for neutron activation analysis. Summary report

    International Nuclear Information System (INIS)

    Kellett, M.A.

    2009-12-01

    The third meeting of the Co-ordinated Research Project on 'Reference Database for Neutron Activation Analysis' was held at the IAEA, Vienna from 17-19 November 2008. A summary of presentations made by participants is given, reports on specific tasks and subsequent discussions. With the aim of finalising the work of this CRP and in order to meet initial objectives, outputs were discussed and detailed task assignments agreed upon. (author)

  9. Midwestern High-Level Radioactive Waste Transportation Project

    International Nuclear Information System (INIS)

    1993-01-01

    On February 17,1989, the Midwestern Office of The Council of State Governments and the US Department of Energy entered into a cooperative agreement authorizing the initiation of the Midwestern High-Level Radioactive Waste Transportation Project. The transportation project continued to receive funding from DOE through amendments to the original cooperative agreement, with December 31, 1993, marking the end of the initial 5-year period. This progress report reflects the work completed by the Midwestern Office from February 17,1989, through December 31,1993. In accordance with the scopes of work governing the period covered by this report, the Midwestern Office of The Council of State Governments has worked closely with the Midwestern High-Level Radioactive Waste Committee. Project staff have facilitated all eight of the committee's meetings and have represented the committee at meetings of DOE's Transportation Coordination Group (TCG) and Transportation External Coordination Working Group (TEC/WG). Staff have also prepared and submitted comments on DOE activities on behalf of the committee. In addition to working with the committee, project staff have prepared and distributed 20 reports, including some revised reports (see Attachment 1). Staff have also developed a library of reference materials for the benefit of committee members, state officials, and other interested parties. To publicize the library, and to make it more accessible to potential users, project staff have prepared and distributed regular notices of resource availability

  10. Investments in information systems and technology in the healthcare: Project management mediation

    Directory of Open Access Journals (Sweden)

    Jorge Gomes

    2017-03-01

    Full Text Available Healthcare organisations must improve their business practices and internal procedures in order to answer the increasing demand of health professionals and the general public for more and better information. Hospitals invest massively in information systems and technology (IS/IT in the hope that these investments will improve healthcare and meet patients’ demands. The main objective of our research is to study how organisational maturity, enhanced by investments in IS/IT, project management and best practices, leads to successful projects in public healthcare organisations. The rational of our model is that organisational maturity has a positive effect on IS/IT project success, and that this success is also positively enhanced by the use of project management practices. We emphasise that this combination of approaches can increase the effectiveness of projects. Furthermore, it can also improve the confidence that the results of investments will meet stakeholders’ expectations.

  11. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  12. 78 FR 2961 - Sunshine Act Meeting-Closed Meeting

    Science.gov (United States)

    2013-01-15

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting--Closed Meeting The following notice of a closed meeting is published pursuant to the provisions of the Government in the Sunshine Act, Public Law 94- 409, 5 U.S.C. 552b. AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME...

  13. 78 FR 6306 - Sunshine Act Meeting-Closed Meeting

    Science.gov (United States)

    2013-01-30

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting--Closed Meeting The following notice of a closed meeting is published pursuant to the provisions of the Government in the Sunshine Act, Public Law 94- 409, 5 U.S.C. 552b. AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME...

  14. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  15. Human Genome Diversity Project. Summary of planning workshop 3(B): Ethical and human-rights implications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The third planning workshop of the Human Genome Diversity Project was held on the campus of the US National Institutes of Health in Bethesda, Maryland, from February 16 through February 18, 1993. The second day of the workshop was devoted to an exploration of the ethical and human-rights implications of the Project. This open meeting centered on three roundtables, involving 12 invited participants, and the resulting discussions among all those present. Attendees and their affiliations are listed in the attached Appendix A. The discussion was guided by a schedule and list of possible issues, distributed to all present and attached as Appendix B. This is a relatively complete, and thus lengthy, summary of the comments at the meeting. The beginning of the summary sets out as conclusions some issues on which there appeared to be widespread agreement, but those conclusions are not intended to serve as a set of detailed recommendations. The meeting organizer is distributing his recommendations in a separate memorandum; recommendations from others who attended the meeting are welcome and will be distributed by the meeting organizer to the participants and to the Project committee.

  16. 76 FR 56879 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-09-14

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small...

  17. 76 FR 37200 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-06-24

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  18. 76 FR 22170 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-04-20

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  19. 76 FR 63715 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-10-13

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small...

  20. 76 FR 46897 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-08-03

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small...

  1. 76 FR 6189 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-02-03

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  2. 76 FR 10942 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-02-28

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self...

  3. Stakeholder Meetings on Black Carbon from Diesel Sources in the Russian Arctic

    Science.gov (United States)

    From January 28-February 1, 2013, EPA and its partners held meetings in Murmansk and Moscow with key Russian stakeholders to gather input into the project’s emissions inventory methodologies and potential pilot project ideas.

  4. Spectroscopic and Collisional Data for Tungsten from 1 eV to 20 keV. Summary Report of the Second Research Coordination Meeting

    International Nuclear Information System (INIS)

    Braams, Bastiaan J.

    2014-08-01

    The second Research Coordination Meeting of a coordinated research project (CRP) on spectroscopic and collisional data for tungsten ions in fusion plasma was held 29-31 August 2012 at Max-Planck- Institute for Nuclear Physics, Heidelberg, Germany. Thirteen projects participate in the CRP and were represented at the meeting together with 8 further experts and 2 IAEA scientific staff. Participants presented their research following which outstanding data needs were identified and a work plan was developed for the remainder of the CRP. The proceedings and conclusions of the meeting are summarized here. (author)

  5. NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development

    Science.gov (United States)

    Hendrix, T. Dean; Schneider, Michelle P.

    1998-01-01

    Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.

  6. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  7. Managing design with the effective use of communication media : the relationship between design dialogues and design team meetings

    NARCIS (Netherlands)

    Emmitt, S.; Otter, den A.F.H.J.

    2007-01-01

    Effective and efficient design team communication is an essential component of architectural design and construction projects. Face-to-face communication, via meetings and dialogue, is an essential means for design team members to discuss and communicate design ideas. Meetings represent an important

  8. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  9. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  10. Railway projects prioritisation for investment : application of goal programming

    OpenAIRE

    Ahern, Aoife; Anandarajah, Gabrial

    2007-01-01

    This research develops a weighted integer goal-programming model for prioritising railway projects for investment. The goal of the model is to prioritise the identified projects for investment while maximising the objectives and meeting the budget limit for capital investment. The model minimises the goal deviations of the objectives. The objectives of the model include quantitative and qualitative attributes. The model is applied to prioritise the new railway projects, which have a total cos...

  11. Proceedings of national avian-wind power planning meeting 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group`s recommendations for future research or associated activities. A final plenary session drew together the main recommendations.

  12. Proceedings of national avian-wind power planning meeting II

    International Nuclear Information System (INIS)

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group's recommendations for future research or associated activities. A final plenary session drew together the main recommendations

  13. Meeting Disorders.

    Science.gov (United States)

    Yager, Joel; Katzman, Jeffrey W

    2017-12-01

    Although meetings are central to organizational work, considerable time devoted to meetings in Academic Health Centers appears to be unproductively spent. The primary purposes of this article are to delineate and describe Meeting Disorders, pathological processes resulting in these inefficient and ineffective scenarios, and Meeting Fatigue Disorder (MFD), a clinical syndrome. The paper also offers preliminary approaches to remedies. The authors integrate observations made during tens of thousands of hours in administrative meetings in academic medical settings with information in the literature regarding the nature, causes and potential interventions for dysfunctional groups and meetings. Meeting Disorders, resulting from distinct pathologies of leadership and organization, constitute prevalent subgroups of the bureaucrapathologies, pathological conditions caused by dysfunctional bureaucratic processes that generate excesses of wasted time, effort, and other resources. These disorders also generate frustration and demoralization among participants, contributing to professional burnout. Meeting Fatigue Disorder (MFD) is a subjective condition that develops in individuals who overdose on these experiences and may reflect one manifestation of burnout. Meeting disorders and Meeting Fatigue Disorder occur commonly in bureaucratic life. Resources and potential remedies are available to help ameliorate their more deleterious effects.

  14. Minutes of the WG.2 meeting, 18 October 1978

    International Nuclear Information System (INIS)

    1978-10-01

    The meeting of WG.2B on 18 October 1978 and the meeting of WG.2 on 18-19 October 1978 are summarized. Both meetings gave attention to the projection of enrichment capacities through the year 2000 and to the content of the final report. An appendix presents French views on the proliferation risks of uranium enrichment. Obtaining highly enriched uranium involves the availability of natural uranium and the mastership of an appropriate enrichment technique. Natural uranium is relatively easily available, so proliferation resistance must be found in the enrichment technique. Some difficulties noted are: Bringing the technique to the level of possible utilization, manufacturing enrichment plant components, starting up, operating, concealing a clandestine plant, and converting an existing LEU plant into a HEU plant by re-arrangement or by batch recycling. A qualitative assessment of the major technologies in terms of these criteria is given

  15. 29 CFR 2701.2 - Open meetings policy; closure of meetings.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Open meetings policy; closure of meetings. 2701.2 Section... GOVERNMENT IN THE SUNSHINE ACT REGULATIONS § 2701.2 Open meetings policy; closure of meetings. (a) Policy. Commission meetings will generally be open to public observation, including meetings concerning the...

  16. 76 FR 17995 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam...

    Science.gov (United States)

    2011-03-31

    ... Small Business/Self Employed Correspondence Exam Practitioner Engagement Project Committee AGENCY... Taxpayer Advocacy Panel Small Business/ Self Employed Correspondence Exam Practitioner Engagement Project... Section 10(a)(2) of the Federal Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the...

  17. Proceedings of the Fifth Users Meeting for the Advanced Photon Source

    International Nuclear Information System (INIS)

    1992-12-01

    The Fifth Users Meeting for the Advanced Photon Source (APS) was held on October 14--15, 1992, at Argonne National Laboratory. Scientists and engineers from universities, industry, and national laboratories came to review the status of the facility and to look ahead to the types of forefront science that will be possible when the APS is completed. The presentations at the meeting included an overview of the project, funding opportunities, advances in synchrotron radiation applications, and technical developments at the APS. In addition, the 15 Collaborative Access Teams that have been approved to date participated in a poster session, and several vendors displayed their wares. The actions taken at the 1992 Business Meeting of the Advanced Photon Source Users Organization are also documented

  18. Meeting electrification's social objectives in South Africa, and implications for developing countries

    International Nuclear Information System (INIS)

    Gaunt, C.T.

    2005-01-01

    Electrification programmes and projects are usually planned and evaluated on the basis of their economic (financial) and socio-economic performance. It is not usually recognised that electrification is often carried out for social objectives of poverty alleviation and political effect. Examination of electrification in South Africa reveals clearly that initial electrification was to meet economic objectives, later socio-economic objectives were adopted, and recently the objectives were social. Social electrification, particularly rural electrification, is not viable according to usual assessment methods, which are frequently distorted to provide the justification for a project to proceed. The technology of network electrification changed to meet the constraints, challenging usual perceptions about the relative costs of urban and rural electrification and the potential for photovoltaic electrification. Adopting a specification for social electrification allows suitable tariffs for electrification to be identified, indicates how capital investment decisions might be modified for social electrification, and identifies implications for electricity industry restructuring. A better understanding of electrification's social objectives has implications for projects and programmes in other developing countries

  19. Improving Software Engineering on NASA Projects

    Science.gov (United States)

    Crumbley, Tim; Kelly, John C.

    2010-01-01

    Software Engineering Initiative: Reduces risk of software failure -Increases mission safety. More predictable software cost estimates and delivery schedules. Smarter buyer of contracted out software. More defects found and removed earlier. Reduces duplication of efforts between projects. Increases ability to meet the challenges of evolving software technology.

  20. 31 CFR 515.575 - Humanitarian projects.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Humanitarian projects. 515.575 Section 515.575 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE... meet basic human needs. Specific licenses may be issued authorizing transactions for multiple visits...

  1. Project LOCAL - Bridging The Gap

    Science.gov (United States)

    Haven, Robert N.

    1975-01-01

    Project LOCAL, a not-for-profit regional consortium, offers a broad spectrum of in-service training courses tailored to meet the needs of educators in various disciplines and levels of experience. The purpose of these offerings is to bridge the communication gap between innovative centers in computer-oriented education and staff members in Boston…

  2. Project VUE: Volunteers Upholding Education.

    Science.gov (United States)

    Thurber, John C.

    This document reports on a project aimed at developing, implementing, and evaluating a plan for using volunteer classroom aides in the Palm Beach County (Florida) schools as a means for meeting various financial, human, and community needs. The desirability of a comprehensive volunteer plan was presented in a 10-point summary by an ad hoc…

  3. Photovoltaic demonstration projects 2

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J [Halcrow (William) and Partners, Swindon (UK); Kaut, W [eds.

    1989-01-01

    This book, the proceedings of the third Photovoltaic Contractors' Meeting organised by the Commission of the European Communities, Directorate-General for Energy provides an overview of the photovoltaic demonstration projects which have been supported by the Energy Directorate of the Commission of the European Communities since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984 and 1985, describing progress with their projects. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of houses, villages, recreation centres, water desalination, communications, dairy farms, water pumping and warning systems. (author).

  4. Urban Agriculture in Thessaloniki. An academic project meets reality

    Directory of Open Access Journals (Sweden)

    Eleftheria Gavrilidou

    2015-12-01

    Full Text Available Nearly all projects with Urban Agriculture (UA impact in Western Europe, in the USA, and in the Developing World are started and thought by single initiatives. In so-called “bottom-up” processes of small scale, they gain energy and power by a fast and none formalized implementation. A master studio project at the Aristotle University of Thessaloniki, “Red and Green”, presents in contrast a proposal for a huge inner city area with focus on UA as generator for a socio-economic transformation towards a green economy based on social community spirit, considering in particular the crisis situation in Greece. The approach which combines the idea of integrating both top-down and bottom-up forces, attempts an integration of permanent and temporarily elements, and by this, the master plan searches qualities as an innovative planning tool. After a phase of intensive dissemination and evaluation on international level with encouraging attentiveness and recognition, a strategy for a realization in steps was created by KIPOS3, a start-up initiative organized by a group of master students to bring in the city of Thessaloniki the concept a common garden manageable by the residents under also the Municipality stewardship. A widespread network of small fallow islands in the city of Thessaloniki was detected and in a process of “mapping the city” several lots were analyzed referring for good chances of implementation. The description of the long way of discussions with landowners, the municipality and potentially users, the difficulties and obstacles, documents once more the initiators strong will and immense energy, which is necessary for a successful start-up. With financial support of a Greek Fellowship a first garden was created in 2015. The history of KIPOS3 garden in Thessaloniki consists finally a useful lesson on the role of “foodscape” on the reactivation of inactive institutions and communities, a lesson of resilience in a city of deep

  5. Summary record of the experts meeting on the proposed OECD-IRSN STLOC project

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this meeting was to determine the interest in member countries for the types of LOCA tests envisaged in the STLOC programme proposed by IRSN. The IRSN proposal was circulated among this Group in advance of the meeting. After the presentations and discussions, the Group recommendations were as follows: different views were expressed as to the need to perform the LOCA integral tests; there was an understanding that the results of separate effect tests (ANL, JAERI, Halden) would need to be obtained before deciding on the intended LOCA tests proposed in STLOC; IRSN and the OECD-NEA should explore the possibility to run the first ST test with air ingress (STLOC1), for which partial funding already exists (this test is foreseen for 2008); the need of LOCA tests as envisaged in STLOC should be re-assessed in about three years time (2006); analytical and experimental progress on LOCA tests should be monitored until then, through for instance the SEGFSM. An executive summary of the IRSN Source term LOCA program LOCA part is given in an appendix

  6. Delivery improvements for CANDU projects

    International Nuclear Information System (INIS)

    Stephen Yu; Ken Hedges

    1998-01-01

    Future CANDU design will continue to meet emerging design and performance requirements as expected by the operating utilities, and will integrate new technologies into both the product features and work processes. Elements of this risk reduction strategy include feedback of lessons learned from operating plants, project experiences from previous projects, and replication of successful systems and equipment. Project implementation risk is minimized by up-front engineering and licensing prior to contract start. Enhanced competitiveness of the CANDU products is ensured by incorporating improvements based on updated technology. This paper summarizes the strategy used to enhance competitiveness of the CANDU products and the measures introduced to minimize risk during project implementation. This strategy provides a balance between innovation and proven designs; and between the desire for safety and operational improvements and the cost to achieve the improvements

  7. Programme Directors' meeting of July 28-29, 1999

    International Nuclear Information System (INIS)

    Canobbio, E.

    1999-01-01

    Dr. Finzi reported in this meeting that, with the approval of the fifth Framework Programme of the EU, continued ITER activities and further operation of the JET facility are secured. Representatives from Japan and from the Russian Federation expressed the support of their governments for the reduced ITER model. The decision of the US party to withdraw from the ITER project was noted with regret

  8. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    Science.gov (United States)

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  9. Data for Erosion and Tritium Retention in Beryllium Plasma-Facing Materials. Summary Report of the First Research Coordination Meeting

    International Nuclear Information System (INIS)

    Braams, B.J.

    2013-04-01

    Nine experts in the field of plasma-wall interaction on beryllium surfaces together with IAEA staff met at IAEA Headquarters 26-28 September 2012 for the First Research Coordination Meeting of an IAEA Coordinated Research Project on data for erosion and tritium retention in beryllium plasma-facing materials. They described their on-going research, reviewed the main data needs and made plans for coordinated research during the remaining years of the project. The proceedings of the meeting are summarized in this report. (author)

  10. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  11. Meeting your financial pro forma in a competitive environment

    International Nuclear Information System (INIS)

    Klausner, C.J.; Pintcke, T.P.; Qadri, S.S.

    1996-01-01

    At times it may seem that the odds are stacked against today's independent power producer when seeking to bid and secure projects, and then having to meet financial obligations within the pro forma. However, many of the problems experienced at independent power plants in the US can be largely mitigated during the engineering and construction phases of the project. Once a plant is constructed, poor technology selection, design, and construction are difficult to correct. Good initial planning and design will optimize plant availability and performance, minimize construction schedule and cost, and control operating expenses over long-term operation

  12. Fourth and final research co-ordination meeting for the coordinated research project on 'Comparative international studies of osteoporosis using isotopic techniques'. Summary report

    International Nuclear Information System (INIS)

    Iyengar, G.V.; Mokhtar, N.

    2002-01-01

    In 1994, the International Atomic Energy Agency started the five-year Co-ordinated Research Project (CRP) on Comparative International Studies of Osteoporosis Using Isotope Techniques. The objectives of this study were: To harmonize the techniques of measuring BMD within the participating countries and to obtain data that can be compared between the different study groups (countries); To determine whether early adult PBM varies between populations over the age range from 15 to 50 years. In other words, to determine the age of peak bone mass in selected populations from developing countries; To explore environmental and nutritional contributions to any determined differences. Further information about the purpose and scope of the CRP may be found in the report of the Advisory Group Meeting (AGM) held in 19921 and other reports of this CRP. Since the last RCM held in 1998, the CRP participants have gathered up more data on BMD. Indeed 3488 subjects 15-50 years) have been recruited for the purpose of this project and have been stratified equally by sex and age into six -year age bands. Most of the participants have also completed collecting data on dietary intake, medical history, physical exercise, and lifestyle, as suggested in the VrHO questionnaire. Some participants have analyzed trace elements in a number of bone samples as well. One of the most important purposes of this CRP is to obtain harmonized data on BMD that is comparable from one study group to another. To ensure this quality insurance, the densitometers in each center were cross calibrated using a European Spine Phantom (ESP). Further-more, day-to-day control of DEXA machines was managed by each individual center. The fourth Research Co-ordination Meeting (RCM) for participants of the CRP, which is the subject of the present report, was held at the University of Sheffield Medical School; WHO Collaborating Center for Metabolic Bone Diseases in Sheffield, UK from 28 Feb. to 3 March 2000

  13. 76 FR 46897 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-08-03

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  14. 76 FR 6190 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-02-03

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  15. 76 FR 37893 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-06-28

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  16. 76 FR 10942 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Correspondence Exam Toll...

    Science.gov (United States)

    2011-02-28

    ... Small Business/Self Employed Correspondence Exam Toll Free Project Committee AGENCY: Internal Revenue... Panel Small Business/ Self Employed Correspondence Exam Toll Free Project Committee will be conducted....C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Small Business/Self Employed...

  17. Impacto dos modelos de referência e maturidade no gerenciamento de projetos: estudo exploratório em projetos de tecnologia da informação Impact of project management reference and project management maturity models on performance: an exploratory study in information technology projects

    Directory of Open Access Journals (Sweden)

    Fernando Tobal Berssaneti

    2012-08-01

    Full Text Available Modelos de maturidade e modelos de referência em gerenciamento de projetos têm sido implantados de forma crescente na área de tecnologia da informação (TI. Este artigo tem por objetivo analisar o impacto do grau de maturidade organizacional em gerenciamento de projetos e o da adoção de modelos de referência no sucesso de projetos de TI. Foi adotada a abordagem de pesquisa quantitativa, com levantamento junto a 51 profissionais da área. Os resultados apontam para correlação positiva entre o grau de maturidade organizacional em gerenciamento de projetos e a satisfação das demandas dos stakeholders (principais interessados no projeto. Também foi constatada relação estatística positiva entre a adoção do PMBoK e o sucesso de projetos de TI, no que concerne ao atendimento dos requisitos e satisfação das demandas dos stakeholders.Project management maturity and project management reference models have been widely adopted on information technology (IT companies. This article aims to analyze the impact of project management maturity level and adopt reference models on IT projects performance (success. A quantitative research approach was used, including a survey with 51 professionals from the sector. Results showed positive impact between project management maturity level and meeting of stakeholders' demands. A positive statistical correlation was also found in firms that develop information technology projects through PMBoK adoption concerning meeting requirements and meeting of stakeholders' demands.

  18. Interagency Advanced Power Group (IAPG) meeting compendium. October 1991--December 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Under the direction of the Interagency Advanced Power Group (IAPG), the Power Information Center (PIC) provides support services for each IAPG information exchange session. IAPG members meet a minimum of once each year to share programmatic and technical information on federally funded research and development (R&D) projects in the area of advanced power. This R&D is directed by one of the five IAPG member agencies-the US Army, US Navy, US Air Force, US Department of Energy, and the National Aeronautics and Space Administration. Affiliated Federal groups and federally funded research and development centers can also participate. To enhance the exchange of information between Government researchers, this 1992 IAPG Meeting Compendium has been assembled. This publication is a re-printing of abstracts of each IAPG presentation offered during 1991-1992. The information is arranged chronologically by IAPG meeting. During the 1992 IAPG meeting year, there were presentations restricted to Government audiences only. These ``Restricted`` minutes have not been included in this compilation.

  19. Minnesota STAR Project: Meeting the Needs of Struggling Adult Readers

    Science.gov (United States)

    Johnson, Kimberly A.; Frank, Margaret M.

    2012-01-01

    This paper reports on findings and implications from a two-year evaluation of the Minnesota STudent Achievement in Reading (STAR) Project. This long-term, job-embedded, professional development activity is provided for Minnesota Adult Basic Education (ABE) practitioners serving intermediate-level adult students reading between 4.0 to 8.9 grade…

  20. Summary Record of the Twenty-Sixth Meeting of the Working Party on International Nuclear Data Evaluation Co-operation

    International Nuclear Information System (INIS)

    Dupont, Emmeric

    2014-01-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document is the executive summary of WPEC's 26. meeting held in 2014. It presents a brief review of the 2 days meeting in particular the Reports on experimental activities in Europe, Japan, USA and China, the Brief progress reports from the evaluation projects (ENDF, JEFF, JENDL, ROSFOND, CENDL, IAEA, TENDL) with the discussion of future plans, the Review of final or near-final subgroup reports, the Status of ongoing subgroups, the Proposals for new subgroups and some information about Conferences and meetings of interest to the nuclear data community. A list of participants and a list of reports presented at this meeting are attached in appendix

  1. Summary report of consultants meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Plompen, A.; Mengoni, A.

    2007-10-01

    A Consultants Meeting on reaction cross section data for minor actinides was held at the IAEA Headquarters, in Vienna on 23 and 24 November, 2007. The main objective of the initiative was to define the detailed plan for the Co-ordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD) CRP. The details of the discussions which took place at the reported meeting include a review of the current activities in the field, a list of recommendations and a proposed timescale for the CRP. (author)

  2. Incorporating Gaming in Software Engineering Projects: Case of RMU Monopoly

    Directory of Open Access Journals (Sweden)

    Sushil Acharya

    2009-02-01

    Full Text Available A major challenge in engineering education is retaining student interest in the engineering discipline. Active student involvement in engineering projects is one way of retaining student interest. Such involvement can only be realized if project inception comes entirely from the student. This paper presents a software game, RMU Monopoly, developed as a project requirement for a software engineering course and describes the challenges and gains of implementing such a project. The RMU Monopoly was proposed by three junior software engineering students. The game is a multi-platform software program that allows up to eight players and implements the rules of the Monopoly board game. To ensure agility the game was developed using the spiral software development model. The Software Requirements Specification (SRS document was finalized through an iterative procedure. Standard Unified Modeling Language (UML diagrams were used for product design. A Risk Mitigation, Monitoring, and Management Plan (RMMM was developed to ensure proactive risk management. Gantt chart, weekly progress meetings and weekly scrum meetings were used to track project progress. C# and Sub- Version were used in a client-server architecture to develop the software. The project was successful in retaining student interest in the software engineering discipline

  3. 76 FR 70709 - Sunshine Act Meeting; Emergency Meeting Notice

    Science.gov (United States)

    2011-11-15

    ... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting; Emergency Meeting Notice This notice that an emergency meeting was held is published pursuant to the provisions of the Government in the Sunshine Act, Public Law 94-409, 5 U.S.C. 552b. AGENCY HOLDING THE MEETING: Commodity Futures Trading...

  4. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  5. XML Schema for Atoms, Molecules and Solids (XSAMS). Summary Report of an IAEA Consultants’ Meeting. Proceedings of a conference

    International Nuclear Information System (INIS)

    Braams, B.J.

    2013-12-01

    A Consultants’ Meeting on “XML Schema for Atoms, Molecules and Solids (XSAMS)” was held in conjunction with the Virtual Atomic and Molecular Data Centre (VAMDC) Cycle Three Project Meeting on the Campus of the University of Vienna on 20-22 February 2012. The meeting was to agree on the adoption of an international standard XSAMS version 1.0 and to discuss implementation activities and user experience with the schema. The proceedings of the meeting are summarized here. (author)

  6. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  7. Managing trade-offs in landscape restoration and revegetation projects.

    Science.gov (United States)

    Maron, Martine; Cockfield, Geoff

    2008-12-01

    Landscape restoration projects often have multiple and disparate conservation, resource enhancement, and sometimes economic objectives, since projects that seek to meet more than one objective tend to be viewed more positively by funding agencies and the community. The degree to which there are trade-offs among desired objectives is an important variable for decision makers, yet this is rarely explicitly considered. In particular, the existence of ecological thresholds has important implications for decision-making at both the project level and the regional level. We develop a model of the possibilities and choices for an agency seeking to achieve two environmental objectives in a region through revegetation of a number of sites. A graphical model of the production possibilities sets for a single revegetation project is developed, and different trade-off relationships are discussed and illustrated. Then the model is used to demonstrate the possibilities for managing all such projects within a region. We show that, where there are thresholds in the trade-off relationship between two objectives, specialization (single- or dominant-objective projects) should be considered. This is illustrated using a case study in which revegetation is used to meet avian biodiversity and salinity mitigation objectives. We conclude that where there are sufficient scientific data, explicit consideration of different types of trade-offs can assist in making decisions about the most efficient mix and type of projects to better achieve a range of objectives within a region.

  8. Cooperative Learning in Graduate Student Projects: Comparing Synchronous versus Asynchronous Collaboration

    Science.gov (United States)

    Strang, Kenneth

    2013-01-01

    Cooperative learning was applied in a graduate project management course to compare the effectiveness of asynchronous versus synchronous online team meetings. An experiment was constructed to allocate students to project teams while ensuring there was a balance of requisite skills, namely systems analysis and design along with HTML/Javascript…

  9. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  10. 78 FR 68044 - Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2013-11-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... Date filed: July 1, 2013. d. Applicant: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm...

  11. 76 FR 15964 - Funding Priorities: Disability and Rehabilitation Research Projects and Centers Program

    Science.gov (United States)

    2011-03-22

    ... of any further ways we could reduce potential costs or increase potential benefits while preserving... would also provide logistical and financial support for annual meetings of the Project Directors of the...) Organizing and providing logistical and financial support for annual meetings of the ADA Regional Centers...

  12. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  13. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  14. 78 FR 5413 - Agenda and Notice of Public Meetings of the Massachusetts Advisory Committee

    Science.gov (United States)

    2013-01-25

    .... The purpose of the meetings are orientation and project planning. Members of the public are entitled... needing accessibility services should contact the Eastern Regional Office at least 10 working days before...

  15. Using facilitative skills in project management

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard; Hansen, Mette Sanne; Jacobsen, Peter

    2013-01-01

    Project management can be seen as a profession, discipline and conceptual framework. It has been developed from different fields, including military engineering, mechanical engineering, social sciences and construction. During recent decades, there has been a number of challenges as to its efficacy...... cooperation, mediated by interconnected and diversified systems, is becoming more and more common. These relatively new forms of interaction imply new demands on skills and methods facilitating project cooperation within and among various organizations. Given the pervasiveness of these demands, project...... managers are frequently finding themselves in situations where using facilitating skills is not an option, but a requirement. Facilitation is to be viewed as a process of ‘obstetric’ aid to meet the challenges of coping with the changing conditions for project management described briefly above...

  16. International meeting 'Selected topics on nuclear methods for non-nuclear applications'. Proceedings

    International Nuclear Information System (INIS)

    Stoyanov, Ch.

    2007-01-01

    The volume includes the presentations given on the International Meeting 'Selected Topics on Nuclear Methods for Non-nuclear Applications'. The meeting was organized by the Project CECOA. The Project 'CEnter for COoerative Activities' (CECOA) of the Institute for Nuclear Research and Nuclear Energy (INRNE) of Bulgarian Academy of Sciences is part of the Program 'Creating of Infrastructure' of Bulgarian Ministry of Science and Education. The CECOA-project unifies the groups of INRNE doing research in the field of nuclear methods. Four Laboratories of INRNE are members of CECOA-project: Moessbauer Spectroscopy and Low Radioactivity Measurements, High-Resolution Gamma-Spectroscopy, Neutron Methods in Condensed Matter, Neutron Optics and Structure Analysis. Taking into account the leading role of education on nuclear physics the Project includes program devoted to the training on nuclear physics. The presented volume contains 23 contributed papers. The contributions are separated in 6 sections. The section 'Nano technology' includes 5 papers. The activity in this field within the Project reveals the collaboration with other Institutes of Bulgarian Academy of Sciences as well as large international contacts. The section 'Radioecology and Radioactive Waste' is two fold. Part of the contributions of the section manifests the connection of the CECOA with small enterprises. The contacts are on the level of common projects concerning the investigations, remediation and release of radioactively contaminated terrain, soils, water, buildings and materials around the former uranium processing industry. Another part of the section is devoted to the application of nuclear methods to the treatment of radioactive waste produced by nuclear power stations. The section 'Neutron Physics' reveals the activity within the Project connected with the study of new materials using polarized neutrons and neutron diffraction methods. The section 'Nuclear Physics' is an introduction to some

  17. My Most Memorable AAS Meeting-December 1957, Butler University, Indianapolis, Indiana

    Science.gov (United States)

    Edmondson, F. K.

    1999-05-01

    My attendance at AAS meetings began with the 46th meeting in September 1931 at the brand new Perkins Observatory. This was the first semester of my junior year at Indiana University. Professor Wilbur Cogshall, my astronomy professor, took me to the meeting, and paid my expenses for dormitory accommodations and meals. Hence, my attendance at AAS meetings covers a span of nearly 68 years. There have been so many "memorable" meetings that it is hard to pick just one. However, the 99th meeting in December 1957 at Butler University in Indianapolis, a joint meeting with the AAAS, is memorable because I was in a wheel chair and using crutches, following an injury to my right knee cap. I was a member of the AAAS Committee to select the "best paper" presented at the meeting to receive the Newcomb Cleveland Prize, and Martin Schwarzschild's first report of results from Project Stratoscope was on the program. I showed up at the Committee meeting in my wheel chair, and nominated Martin's paper for the "best paper" award. The Committee asked a lot of questions and then approved the paper by a unanimous vote. The wheel chair and crutches obviously played a role in convincing the Committee that I had strong feelings about the merits of Martin's paper. Allan Sandage was the Warner Prize Lecturer, and reported on the current status of his revision of the cosmic distance scale. Hubble's 1936 distances needed to be increased by a factor of five to ten.

  18. Proceedings of the nuclear criticality technology safety project

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, R.G. [comp.

    1997-06-01

    This document contains summaries of the most of the papers presented at the 1994 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 10 and 11 at Williamsburg, Va. The meeting was broken up into seven sessions, which covered the following topics: (1) Validation and Application of Calculations; (2) Relevant Experiments for Criticality Safety; (3) Experimental Facilities and Capabilities; (4) Rad-Waste and Weapons Disassembly; (5) Criticality Safety Software and Development; (6) Criticality Safety Studies at Universities; and (7) Training. The minutes and list of participants of the Critical Experiment Needs Identification Workgroup meeting, which was held on May 9 at the same venue, has been included as an appendix. A second appendix contains the names and addresses of all NCTSP meeting participants. Separate abstracts have been indexed to the database for contributions to this proceedings.

  19. Proceedings of the nuclear criticality technology safety project

    International Nuclear Information System (INIS)

    Sanchez, R.G.

    1997-06-01

    This document contains summaries of the most of the papers presented at the 1994 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 10 and 11 at Williamsburg, Va. The meeting was broken up into seven sessions, which covered the following topics: (1) Validation and Application of Calculations; (2) Relevant Experiments for Criticality Safety; (3) Experimental Facilities and Capabilities; (4) Rad-Waste and Weapons Disassembly; (5) Criticality Safety Software and Development; (6) Criticality Safety Studies at Universities; and (7) Training. The minutes and list of participants of the Critical Experiment Needs Identification Workgroup meeting, which was held on May 9 at the same venue, has been included as an appendix. A second appendix contains the names and addresses of all NCTSP meeting participants. Separate abstracts have been indexed to the database for contributions to this proceedings

  20. 75 FR 39492 - Major Capital Investment Projects

    Science.gov (United States)

    2010-07-09

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the date, time, and location of an...