WorldWideScience

Sample records for project involved revising

  1. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  2. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  3. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  4. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  5. Origin and diversification of hoverflies: a revision of the genera Asarkina and Allobaccha – A BIG4 Consortium PhD project

    Directory of Open Access Journals (Sweden)

    Trevor Burt

    2017-08-01

    Full Text Available This BIG4 PhD project involves the overall taxonomic revision of the genera Allobaccha Curran and Asarkina Macquart (Diptera: Syrphidae. The revisions will be divided by biogeographic region (Afrotropical and Indomalayan and published accordingly. The publications will be collated as a thesis for submission to the University of Bonn (Rheinische Friedrich-Wilhelms-Universität Bonn, Germany doctoral program of biology. The goal of this project is to resolve alpha taxonomy and to infer the phylogenetic placement of these genera within the Syrphidae using Next-Generation Sequencing and Anchored Hybrid Enrichment techniques. The techniques undertaken in this project will be applied to future systematic problems in Diptera and testing future phylogenetic hypotheses.

  6. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  7. Revision of migrated pelvic acetabular components in THA with or without vascular involvement

    Directory of Open Access Journals (Sweden)

    Ștefan Cristea

    2016-05-01

    Full Text Available Purpose. The literature describes a high rate of mortality in cases of intrapelvic acetabular component migration, which is a rare but serious complication. Our aim is to establish and propose a treatment protocol according to our results and experience. Material and Methods. We performed eight (8 total hip revisions with acetabular cup migration between 2006 and 2012. A vascular graft was needed in four (4 of these cases. Two (2 cases were revisions after a spacer for infected arthroplasties. The protocol included the following: X-Ray examination (frontal and lateral views, CT angiography, a biological evaluation, a suitable pre-operative plan, at least six (6 units of blood stock, an experienced anesthesiologist, an experienced surgical team that included a vascular surgeon and a versatile arsenal of revision prostheses, bone grafts and vascular grafts. The anterolateral approach was generally used for hip revisions and the retroperitoneal approach in the dorsal decubitus position was used when vascular risk was involved. Results: The acetabular defect was reconstructed using bone grafts and tantalum revision cups in 4 cases, Burch-Schneider cages in 2 cases, a Kerboull ring in 1 case and a cementless oblong cup (Cotyle Espace in 1 case. In 4 cases, an iliac vessel graft procedure was conducted by the vascular surgeon. All patients survived the revision procedures and returned regularly for subsequent check-ups, during which they did not show any septic complications. Conclusions: Intrapelvic acetabular cup migration is a rare but serious complication that can occur after total hip arthroplasty in either septic or aseptic cases. An experienced, multidisciplinary team of surgeons should be involved in planning and conducting such complicated revisions.

  8. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  9. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    International Nuclear Information System (INIS)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process

  10. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  11. Hanford analytical sample projections FY 1996 - FY 2001. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Joyce, S.M.

    1997-07-02

    This document summarizes the biannual Hanford sample projections for fiscal year 1997-2001. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Wastes Remediation Systems, Solid Wastes, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition to this revision, details on Laboratory scale technology (development), Sample management, and Data management activities were requested. This information will be used by the Hanford Analytical Services program and the Sample Management Working Group to assure that laboratories and resources are available and effectively utilized to meet these documented needs.

  12. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  13. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  14. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  15. Response to state comments on the revised draft northeastern regional characterization reports for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1985-08-01

    The purpose of this document is to respond to the comments received from the States of the Northeastern Region on the revised draft Northeastern Regional Characterization Reports (RCRs). The responses in this document indicate the manner in which the suggestions or comments received have been considered in modifying the revised draft Northeastern RCRs. Both general comments related to the overall Crystalline Repository Project (CRP) and comments on specific sections of the RCRs are addressed. This document responds to Northeastern State comments on both the revised draft Northeastern Regional Geologic Characterization Report (RGCR) and the revised draft Northeastern Regional Environmental Characterization Report (RECR)

  16. Response to state comments on the revised draft Southeastern Regional Characterization Reports for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1985-08-01

    The purpose of this document is to respond to the comments received from the states of the Southeastern Region on the revised draft Southeastern Regional Characterization Reports (RCRs). The responses in this document indicate the manner in which the suggestions or comments received have been considered in modifying the revised draft Southeastern RCRs. Both general comments related to the overall Crystalline Repository Project (CRP) and comments on specific sections of the RCRs are addressed. This document responds to Southeastern State comments on both the revised draft Southeastern Regional Geologic Characterization Report (RGCR) and the revised draft Southeastern Regional Environmental Characterization Report (RECR)

  17. The evolution of a doctor of nursing practice capstone process: programmatic revisions to improve the quality of student projects.

    Science.gov (United States)

    Nelson, Joan M; Cook, Paul F; Raterink, Ginger

    2013-01-01

    The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.

  18. Response to state comments on the revised draft North Central Regional characterization reports for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1985-08-01

    The purpose of this document is to respond to the comments received from the states of the North Central Region on the revised draft North Central Regional Characterization Reports (RCRs). The responses in this document indicate the manner in which the suggestions or comments received have been considered in modifying the revised draft North Central RCRs. Both general comments related to the overall Crystalline Repository Project (CRP) and comments on specific sections of the RCRs are addressed. This document responds to North Central State comments on both the revised draft North Central Regional Geologic Characterization Report (RGCR) and the revised draft North Central Regional Environmental Characterization Report (RECR)

  19. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  20. 76 FR 5735 - Revisions to EPA's Rule on Protections for Subjects in Human Research Involving Pesticides

    Science.gov (United States)

    2011-02-02

    ... addressed in EPA science and ethics reviews of proposed and completed human research with pesticides, drawn..., which suggest ethical considerations relevant to evaluation of human studies. Third, Petitioners argued... Revisions to EPA's Rule on Protections for Subjects in Human Research Involving Pesticides AGENCY...

  1. 75 FR 62738 - Revisions to EPA's Rule on Protections for Subjects in Human Research Involving Pesticides...

    Science.gov (United States)

    2010-10-13

    ... addressed in EPA science and ethics reviews of proposed and completed human research for pesticides, based... Revisions to EPA's Rule on Protections for Subjects in Human Research Involving Pesticides; Notification to... protection of human subjects of research that apply to third parties who conduct or support research for...

  2. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    International Nuclear Information System (INIS)

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98

  3. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  4. Public involvement in multi-objective water level regulation development projects-evaluating the applicability of public involvement methods

    International Nuclear Information System (INIS)

    Vaentaenen, Ari; Marttunen, Mika

    2005-01-01

    Public involvement is a process that involves the public in the decision making of an organization, for example a municipality or a corporation. It has developed into a widely accepted and recommended policy in environment altering projects. The EU Water Framework Directive (WFD) took force in 2000 and stresses the importance of public involvement in composing river basin management plans. Therefore, the need to develop public involvement methods for different situations and circumstances is evident. This paper describes how various public involvement methods have been applied in a development project involving the most heavily regulated lake in Finland. The objective of the project was to assess the positive and negative impacts of regulation and to find possibilities for alleviating the adverse impacts on recreational use and the aquatic ecosystem. An exceptional effort was made towards public involvement, which was closely connected to planning and decision making. The applied methods were (1) steering group work, (2) survey, (3) dialogue, (4) theme interviews, (5) public meeting and (6) workshops. The information gathered using these methods was utilized in different stages of the project, e.g., in identifying the regulation impacts, comparing alternatives and compiling the recommendations for regulation development. After describing our case and the results from the applied public involvement methods, we will discuss our experiences and the feedback from the public. We will also critically evaluate our own success in coping with public involvement challenges. In addition to that, we present general recommendations for dealing with these problematic issues based on our experiences, which provide new insights for applying various public involvement methods in multi-objective decision making projects

  5. 7 CFR 3015.115 - Budget revisions.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budget revisions. 3015.115 Section 3015.115..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Programmatic Changes and Budget Revisions § 3015.115 Budget revisions. (a) Nonconstruction projects. (1) Except as provided in paragraph (a)(2) of...

  6. Revising Lecture Notes: How Revision, Pauses, and Partners Affect Note Taking and Achievement

    Science.gov (United States)

    Luo, Linlin; Kiewra, Kenneth A.; Samuelson, Lydia

    2016-01-01

    Note taking has been categorized as a two-stage process: the recording of notes and the review of notes. We contend that note taking might best involve a three-stage process where the missing stage is revision. This study investigated the benefits of revising lecture notes and addressed two questions: First, is revision more effective than…

  7. Yakima fisheries project. Revised draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (adaptive management); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery. Only minor differences in environmental consequences were found between Alternatives 1 and 2. Potentially high impacts on wild, native, and non-target fish populations under both alternatives would be mitigated through careful adherence to the adaptive management process outlined in the EIS

  8. Low-level radioactive waste in the northeast: revised waste volume projections

    International Nuclear Information System (INIS)

    1984-06-01

    The volume of low-level radioactive waste generated in the eleven Northeast states has undergone significant change since the inital 1982 analysis and projection. These revised projections incorporate improved data reporting and evidence of sharp declines in certain categories of waste. Volumes in the 1982-1983 period reflect waste shipped for disposal as reported by disposal site operators. Projected waste volumes represent waste intended for disposal. The recent dramatic changes in source reduction and waste management practices underscore the need for annual review of waste volume projections. The volume of waste shipped for off-site disposal has declined approximately 12% in two years, from an average 1,092,500 ft 3 annually in 1979 to 1981 to an average annual 956,500 ft 3 in 1982 to 1983; reactor waste disposal volumes declined by about 39,000 ft 3 or 7% during this period. Non-reactor waste volumes shipped for disposal declined by over 70,000 ft 3 or 15% during this period. The data suggest that generators increased their use of such management practices as source reduction, compaction, or, for carbon-14 and tritium, temporary storage followed by disposal as non-radioactive waste under the NRC de minimus standard effective March 1981. Using the Technical Subcommittee projection methodology, the volume of low-level waste produced annually in the eleven states, individually and collectively, is expected to increase through the year 2000, but at a significantly lower rate of increase than initially projected. By the year 2000, the Northeast is projected to generate 1,137,600 ft 3 of waste annually, an increase of about 20% over 1982 to 1983 average volume

  9. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  10. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  11. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  12. Informed Consent and Clinical Research Involving Children and Adolescents: Implications of the Revised APA Ethics Code and HIPAA

    Science.gov (United States)

    Fisher, Celia B.

    2004-01-01

    In 2003, 2 new sets of rules and regulations affecting the conduct of clinical research involving children and adolescents went into effect: the revised American Psychological Association's (APA) Ethical Principles of Psychologists and Code of Conduct (APA, 2002; effective June 1, 2003) and the Privacy Rule (45 CFR Part 160 and A and E of Part…

  13. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  14. Fabrication drawings of fuel pins for FUJI project among PSI, JNC and NRG. Revised version 2

    International Nuclear Information System (INIS)

    Ozawa, Takayuki; Nakazawa, Hiroaki; Abe, Tomoyuki; Nagayama, Masahiro

    2002-10-01

    Irradiation tests and post-irradiation examinations in the framework of JNC-PSI-NRG collaboration project will be performed in 2003-2005. Irradiation fuel pins will be fabricated by the middle of 2003. The fabrication procedure for irradiation fuel pins has been started in 2001. Several fabrication tests and qualification tests in JNC and PSI (Paul Scherrer Institut, Switzerland) have been performed before the fuel pin fabrication. According to the design assignment between PSI and JNC in the frame of this project, PSI should make specification documents for the fuel pellet, the sphere-pac fuel particles, the vipac fuel fragments, and the fuel segment fabrication. JNC should make the fabrication drawings for irradiation pins. JNC has been performed the fuel design in cooperation with PSI and NRG (Nuclear Research and Consultancy Group, Holland). In this project, the pelletized fuel, the sphere-pac fuel, and the vipac fuel will be simultaneously irradiated on HFR (High Flux Reactor, Holland). The fabrication drawings have been made under the design assignment with PSI, and consist of the drawings of MOX pellet, thermal insulator pellet, pin components, fuel segments, and the constructed pin. The fabrication drawings were approved in October 2001, but after that, the optimization of specifications was discussed and agreed among all partners. According to this agreement, the fabrication drawings were revised in January 2002. After the earlier revision, the shape of particle retainer to be made by PSI was modified from its drawing beforehand delivered. In this report, the fabrication drawings revised again will be shown, and the fabrication procedure (welding Qualification Tests) will be modified in accordance with the result of discussion on the 3rd technical meeting held in September 2002. These design works have been performed in Fuel Design and Evaluation Group, Plutonium Fuel Fabrication Division, Plutonium Fuel Center under the commission of Plutonium Fuel

  15. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  16. A taxonomic revision of the genus Podocarpus

    NARCIS (Netherlands)

    Laubenfels, de D.J.

    1985-01-01

    In connection with the forthcoming revision of the Coniferae for the Flora Malesiana, the author thought it necessary to revise the genus Podocarpus. Although this genus has a substantial representation in Malesia (30 species), the revision is too involved to be appropriate with the Flora Malesiana

  17. Revised Rules for Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Jensen, F. M.; Middleton, C.

    This paper is based on research performed for the Highway Agency, London, UK under the project DPU/9/44 "Revision of Bridge Assessment Rules Based on Whole Life Performance: Concrete Bridges" It contains details of a methodology which can be used to generate Whole Life (WL) reliability profiles....... These WL reliability profiles may be used to establish revised rules for Concrete Bridges....

  18. Project Earth Science

    CERN Document Server

    Holt, Geoff

    2011-01-01

    Project Earth Science: Astronomy, Revised 2nd Edition, involves students in activities that focus on Earth's position in our solar system. How do we measure astronomical distances? How can we look back in time as we gaze across vast distances in space? How would our planet be different without its particular atmosphere and distance to our star? What are the geometries among Earth, the Moon, and the Sun that yield lunar phases and seasons? Students explore these concepts and others in 11 teacher-tested activities.

  19. Integrating Community into the Classroom: Community Gardening, Community Involvement, and Project-Based Learning.

    Science.gov (United States)

    Langhout, Regina Day; Rappaport, Julian; Simmons, Doretha

    2002-01-01

    Culturally relevant, ongoing project-based learning was facilitated in a predominantly African American urban elementary school via a community garden project. The project involved teachers, students, university members, and community members. This article evaluates the project through two classroom-community collaboration models, noting common…

  20. Functions and requirements for Project W-236B, Initial Pretreatment Module: Revision 1

    International Nuclear Information System (INIS)

    Swanson, L.M.

    1994-01-01

    Hanford Site tank waste supernatants will be pretreated to separate the low-level and high-level fractions. The low-level waste fraction, containing the bulk of the chemical constituents, must be processed into a vitrified waste product which will be disposed of onsite, in a safe, environmentally sound, and cost effective manner. The high-level waste fraction separated during supernatant pretreatment (primarily cesium) will be recombined with an additional high-level waste fraction generated from pretreatment of the tank waste sludges and solids. This combined high-level waste fraction will be immobilized as glass and disposed in a geological repository. The purpose of this document is to establish the functional requirements baseline for Project W-236B, Initial Pretreatment Module, by defining the level 5 and 6 functions and requirements for the project. A functional analysis approach has been used to break down the program functions and associated physical requirements that each function must meet. As the systems engineering process evolves, the design requirements document will replace this preliminary functions and requirements document. The design requirements document (DRD) will identify key decisions and associated uncertainties that impact the project. A revision of this document to a DRD is not expected to change the performance requirements or open issues. However, additional requirements and issues may be identified

  1. Revising REACH guidance on information requirements and chemical safety assessment for engineered nanomaterials for aquatic ecotoxicity endpoints: recommendations from the EnvNano project

    DEFF Research Database (Denmark)

    Hansen, Steffen Foss; Sørensen, Sara Nørgaard; Skjolding, Lars Michael

    2017-01-01

    be made applicable to nanomaterials. European Research Council project EnvNano—Environmental Effects and Risk Evaluation of Engineered, which ran from 2011 to 2016, took another outset by assuming that: “The behaviour of nanoparticles in suspension is fundamentally different from that of chemicals......The European Chemical Agency (ECHA) is in the process of revising its guidance documents on how to address the challenges of ecotoxicological testing of nanomaterials. In these revisions, outset is taken in the hypothesis that ecotoxicological test methods, developed for soluble chemicals, can...... in solution”. The aim of this paper is to present the findings of the EnvNano project and through these provide the scientific background for specific recommendations on how ECHA guidance could be further improved. Key EnvNano findings such as the need to characterize dispersion and dissolution rates in stock...

  2. Partners in projects: preparing for public involvement in health and social care research.

    Science.gov (United States)

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  3. Revision 2 of the NPP Krsko Decommissioning Program Is Stalled

    International Nuclear Information System (INIS)

    Levanat, I.; Lokner, V.; Rapic, A.; Zeleznik, N.; Kralj, M.

    2012-01-01

    Revision 2 of the joint Slovenian-Croatian Program of NPP Krsko Decommissioning and SF andLILW Disposal was scheduled to be finished and formally approved by the end of 2009, in accordance with the bilateral Agreement on the NPP. Slightly behind the schedule, the Project team completed the entire document during spring of 2010, and in June 2010 drafted a proposal for a peer review of the Program by a dedicated IAEA expert mission. This procedure was agreed upon at the last session (May 2010) of the Intergovernmental Commission for implementation of the Agreement, when the Commission was acquainted with the five scenarios of the Revision 2 and with the estimates of their costs/financing. It was expected that the peer review would be performed soon, and that formal adoption of the Revision 2 would follow. Although in this process of approval some decisions remained to be made by the stakeholders, the Project team did select and recommend one scenario to be used for costing purposes, in order to ensure that most necessary corrections in Program financing would be timely adopted. However, the planned IAEA review was cancelled by the Advisory board, the body nominated by the Commission ''to supervise the activities and resolve the issues raised by the Project team''. By this cancellation, the process of Program revision was effectively stalled, because the Advisory board could not clearly define further course of action: differing views between the Slovenian and the Croatian part of the Advisory board appeared, in particular regarding the set of Program scenarios and regarding the appropriateness of the Revision 2 document for the IAEA review; nonetheless, the Advisory board sent to the Project team a compilation of requests to modify Revision 2 document. The Project team determined that some minor requests were easy to fulfill, but other modifications could only be carried out after changes in the boundary conditions (approved by the Commission), or changes in national

  4. Ten Projects to Involve Your Students Directly in French.

    Science.gov (United States)

    van Lent, Peter C.

    1981-01-01

    Proposes 10 activities to provide French classes of all levels with a broad spectrum of language projects involving direct and active use of French including students polling each other, skits based on television commercials, geographical "show and tell," cooking French dishes, writing a monthly newspaper, and field trips. (BK)

  5. The Nordic nuclear safety program 1994-1997. Project handbook

    International Nuclear Information System (INIS)

    1997-06-01

    This is a new revision of the handbook for administrators of the Nordic reactor safety program NKS. The most important administrative functions in project management are described, which should secure a uniform management approach in all the projects. The description of the organizational scheme of the NKS and distribution of responsibilities is followed by examples of various administrative routines and document forms. In the annex the names and addresses of the staff involved in administration of the NKS program are listed. (EG)

  6. Students in a School Environment: A Project Focused on Family Involvement of At-Risk

    Science.gov (United States)

    Denney, Pat

    2011-01-01

    This project examined family involvement of at risk students in mid-west communities. The purpose of this project was to study the affect of family involvement on at-risk student achievement. The redefining of the perception of America has resulted in a crisis of academic performance in the traditionally slow-changing education systems. This topic…

  7. A taxonomic revision of the genus Podocarpus

    OpenAIRE

    Laubenfels, de, D.J.

    1985-01-01

    In connection with the forthcoming revision of the Coniferae for the Flora Malesiana, the author thought it necessary to revise the genus Podocarpus. Although this genus has a substantial representation in Malesia (30 species), the revision is too involved to be appropriate with the Flora Malesiana per se. One new subgenus and 17 new sections are described, and 94 species are enumerated, of which 11 species and 1 variety are described as new, and 3 varieties have been raised to specific rank....

  8. Undergraduate Research Involving Deaf and Hard-of-Hearing Students in Interdisciplinary Science Projects

    Directory of Open Access Journals (Sweden)

    Todd Pagano

    2015-05-01

    Full Text Available Scientific undergraduate research in higher education often yields positive outcomes for student and faculty member participants alike, with underrepresented students often showing even more substantial gains (academic, professional, and personal as a result of the experience. Significant success can be realized when involving deaf and hard-of-hearing (d/hh undergraduate students, who are also vastly underrepresented in the sciences, in interdisciplinary research projects. Even d/hh Associate degree level students and those in the first two years of their postsecondary careers can contribute to, and benefit from, the research process when faculty mentors properly plan/design projects. We discuss strategies, including the dissemination/communication of research results, for involving these students in research groups with different communication dynamics and share both findings of our research program and examples of successful chemical and biological research projects that have involved d/hh undergraduate students. We hope to stimulate a renewed interest in encouraging diversity and involving students with disabilities into higher education research experiences globally and across multiple scientific disciplines, thus strengthening the education and career pipeline of these students.

  9. Communication and Stakeholder Involvement in Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2014-01-01

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  10. Communication and Stakeholder Involvement in Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  11. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    International Nuclear Information System (INIS)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-01-01

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also

  12. Yakima Fisheries Project revised Draft Environmental Impact Statement: Summary

    International Nuclear Information System (INIS)

    1995-05-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and enhancement activities in the Yakima River Basin. The State of Washington and the Yakima Indian Nation would jointly direct the project. The Yakima River system is a promising location for mitigation and enhancement to compensate for stock losses from development and operation of hydroelectric projects elsewhere in the Columbia Basin. The YFP would help determine the role that supplementation might play in increasing natural production of anadromous salmonids throughout the Columbia Basin. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities. The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two alternatives have been proposed: Alternative 1 would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative 2 (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin. (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  13. HEDR modeling approach: Revision 1

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.

    1994-05-01

    This report is a revision of the previous Hanford Environmental Dose Reconstruction (HEDR) Project modeling approach report. This revised report describes the methods used in performing scoping studies and estimating final radiation doses to real and representative individuals who lived in the vicinity of the Hanford Site. The scoping studies and dose estimates pertain to various environmental pathways during various periods of time. The original report discussed the concepts under consideration in 1991. The methods for estimating dose have been refined as understanding of existing data, the scope of pathways, and the magnitudes of dose estimates were evaluated through scoping studies

  14. The use of public participation and economic appraisal for public involvement in large-scale hydropower projects: Case study of the Nam Theun 2 Hydropower Project

    International Nuclear Information System (INIS)

    Mirumachi, Naho; Torriti, Jacopo

    2012-01-01

    Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, public involvement is necessary in the decision-making process (). As financially-significant actors in the planning and implementation of large-scale hydropower projects in developing country contexts, the paper examines the ways in which public involvement may be influenced by international financial institutions. Using the case study of the Nam Theun 2 Hydropower Project in Laos, the paper analyses how public involvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of public participation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the project appraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the project appraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs. - Highlights: ► Public acceptance in large-scale hydropower projects is examined. ► Both procedural and distributional justice are important for public acceptance. ► International Financial Institutions can influence the level of public involvement. ► Public involvement benefits consideration of non-market values and discount rates.

  15. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  16. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  17. [An overview on the collation and revision of medical books by the Bureau for Revising Medical Books in the Northern Song Dynasty].

    Science.gov (United States)

    Meng, Yongliang; Liang, Yongxuan

    2014-07-01

    The Bureau for Revising Medical Books was a temporary agency established by the government of the Northern Song Dynasty in 1057, the 2nd year of Jiayou of Emperor Renzong, exclusively for the edition, revision and publishing of ancient medical books. 11 medical books were revised and edited by 13 Bureau members in a period of 12 years until 1069, the 2nd year of Xining of Emperor ShenZong, which eventually became the final versions until today. 8 medical books were initially planned for the revision, but 11 were actually completed in the end. The time for completing a revision varied from over 10 years at most to less than 1 year at least. Instead of working in the office, the officers of the Bureau for Revising Medical Books did their works at home. The members of the said Bureau came from the Tiju officer of the Bureau for Revising Medical Books and the officials of revising medical books, consisting of both Confucian ministers and medical officers. Confucian ministers played an important role in revising medical books. The Bureau had a strict workflow in electing revising officials, making the project, and the determination of the principles and arrangements of the tasks of editing and proofreading.

  18. Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2017-03-01

    Full Text Available Private investors have been encouraged to participate in the development and operation of urban rail projects in China through Public-Private Partnerships (PPPs, given the fact that subnational governments are suffering from urgent development demands and severe fiscal pressure. However, there is no formal assessment to determine the private involvement in a PPP project. This problem is particularly critical in the sector of urban rail, in which the huge investment cannot rely on the private sector alone. This study hence aimed to uncover and identify the influencing factors. Multiple research methods, including content analysis, case study and focus group discussion were adopted to achieve the research purpose. Seven types of influencing factors were identified, including project financial model, government fiscal commitment, risk allocation, public accountability, efficiency considerations, policy and regulations, and organisational marketing strategies. The findings add to the current knowledge base by uncovering the drivers behind private involvement in a PPP project. They are also beneficial for industry practitioners as a basis/checklist to determine the private involvement.

  19. Operational waste volume projection. Revision 20

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  20. Inquiry, A Project of the Wisconsin Bar Foundation. Vols. 1 and 2, Revised.

    Science.gov (United States)

    Scheurich, G. Michael, Ed.

    This new, revised edition of the Inquiry instructional materials is designed for use in teaching high school students about the U. S. laws and legal systems. The revised outlines, designed for instructors who have had legal training, are less technical and more informal, include new concepts and many current relevant topics, and de-emphasize…

  1. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  2. A Project in Thermal Physics Involving a Car Parked in Direct Sunlight

    Science.gov (United States)

    Lee, Wei; Gilley, Heidi L.; Caris, Joshua B.

    1997-05-01

    A research project for introductory physics students, involving an estimate of the surface temperature of the Sun using a parked car, was carried out in the Summer 1995 Research Apprenticeships in Science Program, sponsored by Edison Industrial Systems Center, for local-area high school students. This activity entails both outdoor quantitative observations and theoretical analysis, and yields a result within 12 percent of the accepted value. It was demonstrated that the use of everyday materials and outdoor observations, such as those in this project, is not only educational but also intriguing. The success of this experiment as a summer research project will be discussed.

  3. Early Involvement and Integration in Construction Projects: The Benefits of DfX in Elimination of Wastes

    Directory of Open Access Journals (Sweden)

    Heikki Halttula

    2017-12-01

    Full Text Available Typical construction processes provide waste: material waste but especially process-related waste. The majority of this waste can be avoided with efficient planning in the front end of projects. The main aim is to describe how the concept of Design for Excellence (DfX can reduce the most severe waste in construction projects. Based on a literature review of waste and requirements that aid early involvement and integration, we created a survey for analyzing and prioritizing types of waste in the construction industry. We describe how DFX reduces this waste, especially through the use of early involvement and integration. When applied, DfX creates incentives for project stakeholders to eliminate waste automatically through early involvement and integration.

  4. Descriptor revision belief change through direct choice

    CERN Document Server

    Hansson, Sven Ove

    2017-01-01

    This book provides a critical examination of how the choice of what to believe is represented in the standard model of belief change. In particular the use of possible worlds and infinite remainders as objects of choice is critically examined. Descriptors are introduced as a versatile tool for expressing the success conditions of belief change, addressing both local and global descriptor revision. The book presents dynamic descriptors such as Ramsey descriptors that convey how an agent’s beliefs tend to be changed in response to different inputs. It also explores sentential revision and demonstrates how local and global operations of revision by a sentence can be derived as a special case of descriptor revision. Lastly, the book examines revocation, a generalization of contraction in which a specified sentence is removed in a process that may possibly also involve the addition of some new information to the belief set.

  5. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Science.gov (United States)

    2012-07-17

    ...-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a... licenses for the proposed Uniontown Hydroelectric Project and Newburgh Hydroelectric Project. The...

  6. Korean Medication Algorithm Project for Bipolar Disorder: third revision.

    Science.gov (United States)

    Woo, Young Sup; Lee, Jung Goo; Jeong, Jong-Hyun; Kim, Moon-Doo; Sohn, Inki; Shim, Se-Hoon; Jon, Duk-In; Seo, Jeong Seok; Shin, Young-Chul; Min, Kyung Joon; Yoon, Bo-Hyun; Bahk, Won-Myong

    2015-01-01

    To constitute the third revision of the guidelines for the treatment of bipolar disorder issued by the Korean Medication Algorithm Project for Bipolar Disorder (KMAP-BP 2014). A 56-item questionnaire was used to obtain the consensus of experts regarding pharmacological treatment strategies for the various phases of bipolar disorder and for special populations. The review committee included 110 Korean psychiatrists and 38 experts for child and adolescent psychiatry. Of the committee members, 64 general psychiatrists and 23 child and adolescent psychiatrists responded to the survey. The treatment of choice (TOC) for euphoric, mixed, and psychotic mania was the combination of a mood stabilizer (MS) and an atypical antipsychotic (AAP); the TOC for acute mild depression was monotherapy with MS or AAP; and the TOC for moderate or severe depression was MS plus AAP/antidepressant. The first-line maintenance treatment following mania or depression was MS monotherapy or MS plus AAP; the first-line treatment after mania was AAP monotherapy; and the first-line treatment after depression was lamotrigine (LTG) monotherapy, LTG plus MS/AAP, or MS plus AAP plus LTG. The first-line treatment strategy for mania in children and adolescents was MS plus AAP or AAP monotherapy. For geriatric bipolar patients, the TOC for mania was AAP/MS monotherapy, and the TOC for depression was AAP plus MS or AAP monotherapy. The expert consensus in the KMAP-BP 2014 differed from that in previous publications; most notably, the preference for AAP was increased in the treatment of acute mania, depression, and maintenance treatment. There was increased expert preference for the use of AAP and LTG. The major limitation of the present study is that it was based on the consensus of Korean experts rather than on experimental evidence.

  7. Fabrication drawings of fuel pins for FUJI project among PSI, JNC and NRG. Revised version

    International Nuclear Information System (INIS)

    Ozawa, Takayuki; Nakazawa, Hiroaki; Abe, Tomoyuki; Nagayama, Masahiro

    2002-02-01

    Irradiation tests and post-irradiation examinations in the framework of JNC-PSI-NRG collaboration project will be performed in 2003-2005. Irradiation fuel pins will be fabricated by the middle of 2003. The fabrication procedure for irradiation fuel pins has been started in 2001. Several fabrication tests and qualification tests in JNC and PSI (Paul Scherrer Institute, Switzerland) have been performed before the fuel pin fabrication. According to the design assignment between PSI and JNC in the frame of this project, PSI should make a specification document for the fuel pellet, the sphere-pac fuel particles, the vipac fuel particles, and the fuel pin. JNC should make a fabrication drawing for irradiation pins. JNC has been performed the fuel design in cooperation with PSI and NRG (Nuclear Research and Consultancy Group, Netherlands). In this project, the pelletized fuel, the sphere-pac fuel, and the vipac fuel will be simultaneously irradiated on HFR (High Flux Reactor, Netherlands). This fabrication drawing has been made under the design assignment with PSI, and consists of the drawing of MOX pellet, thermal insulator pellet, pin components, fuel segments, and the constructed pin. The fabrication drawings were approved in October 2001, but after that, the optimization of specifications has been discussed and agreed among all partners. In this report, the revised fabrication drawings will be shown. Based on the commission of Plutonium Fuel Technology Group, Advanced Fuel Recycle Technology Division, this design work has been performed in Fuel Design and Evaluation Group, Plutonium Fuel Fabrication Division, Plutonium Fuel Center. (author)

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  9. Mecanismos envolvidos na cicatrização: uma revisão Mechanisms involved in wound healing: a revision

    Directory of Open Access Journals (Sweden)

    Carlos Aberto Balbino

    2005-03-01

    Full Text Available Os mecanismos envolvidos no processo de reparo de tecidos estão revisados nesse trabalho. O processo de cicatrização ocorre fundamentalmente em três fases: inflamação, formação de tecido de granulação e deposição de matriz extracelular e remodelação. Os eventos celulares e tissulares de cada uma dessas fases estão descritos e discutidos. Os mediadores químicos estão correlacionados com os eventos do processo de cicatrização e as células envolvidas. Especial ênfase é dada à participação dos fatores de crescimento.The mechanisms involved in tissue repair are revised. The wound healing process occurs basically in three phases: inflammation, formation of granulating tissue and extracellular tissue deposition, and tissue remodeling. The cellular and tissue events of each phase are described and discussed. The chemical mediators and their interplay with the wound healing events and cells involved are also discussed. However, especial attention was given to the role played by the growth factors in the tissue repair process.

  10. Migrant Education Administrative Handbook. Revised April 1973.

    Science.gov (United States)

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    The revised handbook provides specific references to the legislation and the National Migrant Program Guidelines, while setting forth the administrative procedures required for migrant projects in North Carolina. Specific topics of discussion in migrant program administration cover Public Law 89-750, state and local educational agency…

  11. The Memory-Impairing Effects of Septal GABA Receptor Activation Involve GABAergic Septo-Hippocampal Projection Neurons

    Science.gov (United States)

    Krebs-Kraft, Desiree L.; Wheeler, Marina G.; Parent, Marise B.

    2007-01-01

    Septal infusions of the [gamma]-aminobutyric acid (GABA)[subscript A] agonist muscimol impair memory, and the effect likely involves the hippocampus. GABA[subscript A] receptors are present on the perikarya of cholinergic and GABAergic septo-hippocampal (SH) projections. The current experiments determined whether GABAergic SH projections are…

  12. Description of Project Sapphire. Revision 1

    International Nuclear Information System (INIS)

    Taylor, R.G.

    1995-01-01

    The mission of Project Sapphire was to repackage approximately 600 kg of highly enriched uranium (HEU) in the Republic of Kazakhstan into internationally acceptable shipping packages and transport the material to a storage location in the United States. There were four material types to be repackaged: metal; oxide; uranium/beryllium (U/Be) alloy; and residues from U/Be alloy production. Seven major steps described in this report were necessary for successful execution of the project: planning and training; readiness assessment; deployment; set up; process; take down; and transport. Nuclear criticality safety especially affected several of these steps

  13. Radioactive air emissions notice of construction for Canister Storage Building (revised sealing configuration for spent nuclear fuel) - Project W-379

    International Nuclear Information System (INIS)

    Kamberg, L.D.

    1998-01-01

    The purpose of this Notice of Construction (NOC) is to provide a rewritten NOC for obtaining regulatory approval for changes to the previous Canister Storage Building (CSB) NOCs (WDOH, 1996 and EPA, 1996) as were approved by the Washington State Department of Health (WDOH, 1996a) and US Environmental Protection Agency (EPA, 1996a). These changes are because of a revised sealing configuration of the multi-canister overpacks (MCOS) that are used to store the SNF. A flow schematic of the SNF Project is provided in Figure 1-1. A separate notification of startup will be provided apart from this NOC

  14. 32 CFR 37.220 - How involved should the Government program official be in the project?

    Science.gov (United States)

    2010-07-01

    ... official be in the project? 37.220 Section 37.220 National Defense Department of Defense OFFICE OF THE... Technology Investment Agreements § 37.220 How involved should the Government program official be in the project? (a) TIAs are used to carry out cooperative relationships between the Federal Government and the...

  15. Structuring and financing new nuclear power plant projects in Europe: selected remarks

    International Nuclear Information System (INIS)

    Belchev, A.

    2004-01-01

    Project financing in the field of nuclear energy is discussed taking into account the changes and new challenges in Europe. Bringing a project to maturity under 'revised' assumptions is likely to be a complex task for all parties involved, but there is a real potential for an enhanced role for stake holders from the private sector. There is a more realistic understanding about how the public and the private sectors can work together. Successfully combining public and private, national and foreign stake holders is likely to be a critical factor of success. The alignment of interest over the long term best serves a projects business case. In that context, a Governments policies are increasingly under the spotlight

  16. Structured Head and Neck CT Angiography Reporting Reduces Resident Revision Rates.

    Science.gov (United States)

    Johnson, Tucker F; Brinjikji, Waleed; Doolittle, Derrick A; Nagelschneider, Alex A; Welch, Brian T; Kotsenas, Amy L

    2018-04-12

    This resident-driven quality improvement project was undertaken to assess the effectiveness of structured reporting to reduce revision rates for afterhours reports dictated by residents. The first part of the study assessed baseline revision rates for head and neck CT angiography (CTA) examinations dictated by residents during afterhours call. A structured report was subsequently created based on templates on the RSNA informatics reporting website and critical findings that should be assessed for on all CTA examinations. The template was made available to residents through the speech recognition software for all head and neck CTA examinations for a duration of 2 months. Report revision rates were then compared with and without use of the structured template. The structured template was found to reduce revision rates by approximately 50% with 10/41 unstructured reports revised and 2/17 structured reports revised. We believe that structured reporting can help reduce reporting errors, particularly in term of typographical errors, train residents to evaluate complex examinations in a systematic fashion, and assist them in recalling critical findings on these examinations. Copyright © 2018 Elsevier Inc. All rights reserved.

  17. Revising Translations

    DEFF Research Database (Denmark)

    Rasmussen, Kirsten Wølch; Schjoldager, Anne

    2011-01-01

    The paper explains the theoretical background and findings of an empirical study of revision policies, using Denmark as a case in point. After an overview of important definitions, types and parameters, the paper explains the methods and data gathered from a questionnaire survey and an interview...... survey. Results clearly show that most translation companies regard both unilingual and comparative revisions as essential components of professional quality assurance. Data indicate that revision is rarely fully comparative, as the preferred procedure seems to be a unilingual revision followed by a more...... or less comparative rereading. Though questionnaire data seem to indicate that translation companies use linguistic correctness and presentation as the only revision parameters, interview data reveal that textual and communicative aspects are also considered. Generally speaking, revision is not carried...

  18. Current Epidemiology of Revision Total Knee Arthroplasty in the United States.

    Science.gov (United States)

    Delanois, Ronald E; Mistry, Jaydev B; Gwam, Chukwuweike U; Mohamed, Nequesha S; Choksi, Ujval S; Mont, Michael A

    2017-09-01

    Revision surgery for failed total knee arthroplasty (TKA) continues to pose a substantial burden for the United States healthcare system. The predominant etiology of TKA failure has changed over time and may vary between studies. This report aims to update the current literature on this topic by using a large national database. Specifically, we analyzed: (1) etiologies for revision TKA; (2) frequencies of revision TKA procedures; (3) various demographics including payer type and region; and (4) the length of stay (LOS) and total charges based on type of revision TKA procedure. The Healthcare Cost and Utilization Project (HCUP) National Inpatient Sample (NIS) database was used to identify all revision TKA procedures performed between 2009 and 2013. Clinical, economic, and demographic data were collected and analyzed for 337,597 procedures. Patients were stratified according to etiology of failure, age, sex, race, US census region, and primary payor class. The mean LOS and total charges were also calculated. Infection was the most common etiology for revision TKA (20.4%), closely followed by mechanical loosening (20.3%). The most common revision TKA procedure performed was all component revision (31.3%). Medicare was the primary payor for the greatest proportion of revisions (57.7%). The South census region performed the most revision TKAs (33.2%). The overall mean LOS was 4.5 days, with arthrotomy for removal of prosthesis without replacement procedures accounting for the longest stays (7.8 days). The mean total charge for revision TKAs was $75,028.07. Without appropriate measures in place, the burden of revision TKAs may become overwhelming and pose a strain on providers and institutions. Continued insight into the etiology and epidemiology of revision TKAs may be the principle step towards improving outcomes and mitigating the need for future revisions. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Revision total hip arthoplasty: factors associated with re-revision surgery.

    Science.gov (United States)

    Khatod, Monti; Cafri, Guy; Inacio, Maria C S; Schepps, Alan L; Paxton, Elizabeth W; Bini, Stefano A

    2015-03-04

    The survivorship of implants after revision total hip arthroplasty and risk factors associated with re-revision are not well defined. We evaluated the re-revision rate with use of the institutional total joint replacement registry. The purpose of this study was to determine patient, implant, and surgeon factors associated with re-revision total hip arthroplasty. A retrospective cohort study was conducted. The total joint replacement registry was used to identify patients who had undergone revision total hip arthroplasty for aseptic reasons from April 1, 2001, to December 31, 2010. The end point of interest was re-revision total hip arthroplasty. Risk factors evaluated for re-revision total hip arthroplasty included: patient risk factors (age, sex, body mass index, race, and general health status), implant risk factors (fixation type, bearing surface, femoral head size, and component replacement), and surgeon risk factors (volume and experience). A multivariable Cox proportional hazards model was used. Six hundred and twenty-nine revision total hip arthroplasties with sixty-three (10%) re-revisions were evaluated. The mean cohort age (and standard deviation) was 57.0 ± 12.4 years, the mean body mass index (and standard deviation) was 29.5 ± 6.1 kg/m(2), and most of the patients were women (64.5%) and white (81.9%) and had an American Society of Anesthesiologists score of associated with the risk of re-revision. For every ten-year increase in patient age, the hazard ratio for re-revision decreases by a factor of 0.72 (95% confidence interval, 0.58 to 0.90). For every five revision surgical procedures performed by a surgeon, the risk of revision decreases by a factor of 0.93 (95% confidence interval, 0.86 to 0.99). At the time of revision, a new or retained cemented femoral implant or all-cemented hip implant increases the risk of revision by a factor of 3.19 (95% confidence interval, 1.22 to 8.38) relative to a retained or new uncemented hip implant. A ceramic on a

  20. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  1. Sumario de Reglamentos Revisados de Titulo I - Educacion Migrante (Summary of Revised Title I - Migrant Regulations).

    Science.gov (United States)

    Gonzalez, Ramon

    Extracted from the April 3, 1980 Federal Register, revisions of the Migrant Education regulations are synthesized in this Spanish-English booklet. Revised regulations address program planning and evaluation; needs assessment; identification and recruitment of migrant children; and special discretionary projects for the coordination of migrant…

  2. Draft revision of human factors guideline HF-010

    International Nuclear Information System (INIS)

    Lee, Hyun Chul; Lee, Yong Hee; Oh, In Seok; Lee, Jung Woon; Cha, Woo Chang; Lee, Dhong Ha

    2003-05-01

    The Application of Human Factors to the design of Man-Machine Interfaces System(MMIS) in the nuclear power plant is essential to the safety and productivity of the nuclear power plants, human factors standards and guidelines as well as human factors analysis methods and experiments are weightily used to the design application. A Korean engineering company has developed a human factors engineering guideline, so-call HF-010, and has used it for human factors design, however the revision of HF-010 is necessary owing to lack of the contents related to the advanced MMI(Man-Machine Interfaces). As the results of the reviews of HF-010, it is found out that the revision of Section 9. Computer Displays of HF-010 is urgent, thus the revision was drafted on the basis of integrated human factors design guidelines for VDT, human factors design guidelines for PMAS SPADES display, human factors design guidelines for PMAS alarm display, and human factors design guidelines for electronic displays developed by the surveillance and operation support project of KOICS. The draft revision of HF-010 Section 9 proposed in this report can be utilized for the human factors design of the advanced MMI, and the high practical usability of the draft can be kept up through the continuous revision according to the advancement of digital technology

  3. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  4. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ''Draft'' Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ''Draft'' MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million

  5. Public involvement plan for the Oak Ridge Reservation. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    For the past few years, the Department of Energy (DOE) has increased its efforts to involve the public in environmental management decisions. On the national level, Energy Secretary Hazel O'Leary has declared public involvement one of DOE's most important objectives. On the local level, citizens are taking the microphone at DOE public hearings to voice their opinions and ask tough, detailed questions about proposed cleanup plans. To ensure that it hears, understands and responds to public input from all of its neighbors, DOE-Oak Ridge Operations has developed an Environmental Management Public Involvement Program to keep stakeholders--those affected or potentially affected by cleanup programs--informed about environmental management work on the Oak Ridge Reservation and opportunities for public comment. This Public Involvement Plan contains information about the Oak Ridge Public Involvement Program its history, goals and proposed interactions with stakeholders. It also contains information to help area citizens become involved or increase their involvement in helping DOE make responsible environmental management decisions

  6. Fast flux test facility, transition project plan

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1994-01-01

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  7. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  8. Proceedings of the topical session on stakeholder involvement in decommissioning projects

    International Nuclear Information System (INIS)

    Santiago, Juan Luis; Chandler, Steve; Metcalfe, Doug; Le Bars, Yves

    2006-01-01

    Set up by the Radioactive Waste Management Committee (RWMC), the WPDD brings together senior representatives of national organisations who have a broad overview of Decommissioning and Dismantling (D and D) issues through their work as regulators, implementers, R and D experts or policy makers. These include representatives from regulatory authorities, industrial decommissioners from the NEA Co-operative Programme on Exchange of Scientific and Technical Information on Nuclear Installation Decommissioning Projects (CPD), and cross-representation from the other NEA Committees. The EC is a member of the WPDD and the IAEA is participating as an observer. This broad participation provides good possibilities for the co-ordination efforts amongst activities in the international programmes. At its sixth meeting, in Paris, 14-16 November 2005, the WPDD held a topical session on the 'Stakeholder Involvement in Decommissioning Projects'. The topical session was jointly planned and run with members of the NEA Forum on Stakeholder Confidence (FSC). This report documents the topical session. The main text summarises the lessons learnt and includes the rapporteurs reports. Appendix 1 and 2 provide the agenda of the topical session and all contributed papers respectively. The Topical session also provided a stimuli to review all the contributions in the area of stakeholder involvement that the WPDD has received since its inception. A list of references is provided in Appendix 3. The topical session was meant to provide an exchange of information and experience on the following issues: - Views from Stakeholders Regarding Stakeholder Involvement and Their Own Role. - Case Studies on Stakeholders Confidence. At the end of each session time was allotted for a plenary discussion. The Rapporteur reviewed the main points and the lessons learnt at the end of the whole Topical Session. (authors)

  9. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  10. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site's contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b)

  11. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  12. Hanford Internal Dosimetry Project manual. Revision 1

    International Nuclear Information System (INIS)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.; Long, M.P.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, and guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program

  13. Hanford Internal Dosimetry Project manual. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.; Long, M.P.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, and guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program.

  14. Revision Total Hip Arthoplasty: Factors Associated with Re-Revision Surgery

    OpenAIRE

    Khatod, M; Cafri, G; Inacio, MCS; Schepps, AL; Paxton, EW; Bini, SA

    2015-01-01

    The survivorship of implants after revision total hip arthroplasty and risk factors associated with re-revision are not well defined. We evaluated the re-revision rate with use of the institutional total joint replacement registry. The purpose of this study was to determine patient, implant, and surgeon factors associated with re-revision total hip arthroplasty.A retrospective cohort study was conducted. The total joint replacement registry was used to identify patients who had undergone revi...

  15. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  16. Development of the Wechsler Memory Scale--Revised.

    Science.gov (United States)

    Herman, David O.; Young, Laura

    A study involving a sample of people selected to represent the nonimpaired American population, aged 16 to 74 years, was undertaken to determine the effectiveness of the Wechsler Memory Scale--Revised. The scale's subtests were designed to assess memory of personal and general knowledge, logical memory, verbal paired association, figural memory,…

  17. Teacher Learning within a Multinational Project in an Upper Secondary School

    Directory of Open Access Journals (Sweden)

    Liisa Ilomäki

    2017-01-01

    Full Text Available In this case study, we investigated teachers’ professional learning within a multinational project in an upper secondary school. The aim of the study was to investigate how the participating teachers adopted and applied the trialogical approach (TLA in their pedagogical practices and their challenges in doing that. The mixed method approach was used for data collection and analysis. About one-fourth of the teachers participated in the activities, ten females and three males. Three groups were identified, based on their activity in the project: pilot teachers, active adopters, and adopters. Altogether 79 students (38 males and 41 females answered a questionnaire concerning the pedagogical practices. The pedagogical revisions were well in line with TLA; the revised courses as well as new iterations and new ideas were indicators of the teachers’ creative implementation processes. However, some of the TLA ideas were more difficult to apply in an upper secondary school context; for example, the implementation of ideas involving cross-fertilization with other organizations and cultures was rare. In order to learn new pedagogical practices, teachers need organized time for collaborative planning, for reflecting, and for sharing.

  18. Discovering beaten paths in collaborative ontology-engineering projects using Markov chains.

    Science.gov (United States)

    Walk, Simon; Singer, Philipp; Strohmaier, Markus; Tudorache, Tania; Musen, Mark A; Noy, Natalya F

    2014-10-01

    Biomedical taxonomies, thesauri and ontologies in the form of the International Classification of Diseases as a taxonomy or the National Cancer Institute Thesaurus as an OWL-based ontology, play a critical role in acquiring, representing and processing information about human health. With increasing adoption and relevance, biomedical ontologies have also significantly increased in size. For example, the 11th revision of the International Classification of Diseases, which is currently under active development by the World Health Organization contains nearly 50,000 classes representing a vast variety of different diseases and causes of death. This evolution in terms of size was accompanied by an evolution in the way ontologies are engineered. Because no single individual has the expertise to develop such large-scale ontologies, ontology-engineering projects have evolved from small-scale efforts involving just a few domain experts to large-scale projects that require effective collaboration between dozens or even hundreds of experts, practitioners and other stakeholders. Understanding the way these different stakeholders collaborate will enable us to improve editing environments that support such collaborations. In this paper, we uncover how large ontology-engineering projects, such as the International Classification of Diseases in its 11th revision, unfold by analyzing usage logs of five different biomedical ontology-engineering projects of varying sizes and scopes using Markov chains. We discover intriguing interaction patterns (e.g., which properties users frequently change after specific given ones) that suggest that large collaborative ontology-engineering projects are governed by a few general principles that determine and drive development. From our analysis, we identify commonalities and differences between different projects that have implications for project managers, ontology editors, developers and contributors working on collaborative ontology

  19. Discovering Beaten Paths in Collaborative Ontology-Engineering Projects using Markov Chains

    Science.gov (United States)

    Walk, Simon; Singer, Philipp; Strohmaier, Markus; Tudorache, Tania; Musen, Mark A.; Noy, Natalya F.

    2014-01-01

    Biomedical taxonomies, thesauri and ontologies in the form of the International Classification of Diseases as a taxonomy or the National Cancer Institute Thesaurus as an OWL-based ontology, play a critical role in acquiring, representing and processing information about human health. With increasing adoption and relevance, biomedical ontologies have also significantly increased in size. For example, the 11th revision of the International Classification of Diseases, which is currently under active development by the World Health Organization contains nearly 50, 000 classes representing a vast variety of different diseases and causes of death. This evolution in terms of size was accompanied by an evolution in the way ontologies are engineered. Because no single individual has the expertise to develop such large-scale ontologies, ontology-engineering projects have evolved from small-scale efforts involving just a few domain experts to large-scale projects that require effective collaboration between dozens or even hundreds of experts, practitioners and other stakeholders. Understanding the way these different stakeholders collaborate will enable us to improve editing environments that support such collaborations. In this paper, we uncover how large ontology-engineering projects, such as the International Classification of Diseases in its 11th revision, unfold by analyzing usage logs of five different biomedical ontology-engineering projects of varying sizes and scopes using Markov chains. We discover intriguing interaction patterns (e.g., which properties users frequently change after specific given ones) that suggest that large collaborative ontology-engineering projects are governed by a few general principles that determine and drive development. From our analysis, we identify commonalities and differences between different projects that have implications for project managers, ontology editors, developers and contributors working on collaborative ontology

  20. Revised

    DEFF Research Database (Denmark)

    Johannsen, Vivian Kvist; Nord-Larsen, Thomas; Riis-Nielsen, Torben

    This report is a revised analysis of the Danish data on CO2 emissions from forest, afforestation and deforestation for the period 1990 - 2008 and a prognosis for the period until 2020. Revision have included measurements from 2009 in the estimations. The report is funded by the Ministry of Climate...

  1. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  2. Groundwater Pathway Model for the Los Alamos National Laboratory Technical Area 54, Area G, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Chu, Shaoping [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Miller, Terry A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Strobridge, Daniel M. [Neptune Inc., Los Alamos, NM (United States); Cole, Gregory L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Birdsell, Kay H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Robinson, Bruce Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gable, Carl Walter [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Broxton, David E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Springer, Everett P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Schofield, Tracy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-10

    This report consists of four major sections, including this introductory section. Section 2 provides an overview of previous investigations related to the development of the current sitescale model. The methods and data used to develop the 3-D groundwater model and the techniques used to distill that model into a form suitable for use in the GoldSim models are discussed in Section 3. Section 4 presents the results of the model development effort and discusses some of the uncertainties involved. Eight attachments that provide details about the components and data used in this groundwater pathway model are also included with this report. The groundwater modeling effort reported here is a revision of the work that was conducted in 2005 (Stauffer et al., 2005a) in support of the 2008 Area G performance assessment and composite analysis (LANL, 2008). The revision effort was undertaken primarily to incorporate new geologic information that has been collected since 2003 at, and in the vicinity of, Area G. The new data were used to create a more accurate geologic framework model (GFM) that forms the basis of the numerical modeling of the site’s long-term performance. The groundwater modeling uses mean hydrologic properties of the geologic strata underlying Area G; this revision includes an evaluation of the impacts that natural variability in these properties may have on the model projections.

  3. Comparative Analysis of Direct Hospital Care Costs between Aseptic and Two-Stage Septic Knee Revision

    Science.gov (United States)

    Kasch, Richard; Merk, Sebastian; Assmann, Grit; Lahm, Andreas; Napp, Matthias; Merk, Harry; Flessa, Steffen

    2017-01-01

    Background The most common intermediate and long-term complications of total knee arthroplasty (TKA) include aseptic and septic failure of prosthetic joints. These complications cause suffering, and their management is expensive. In the future the number of revision TKA will increase, which involves a greater financial burden. Little concrete data about direct costs for aseptic and two-stage septic knee revisions with an in depth-analysis of septic explantation and implantation is available. Questions/Purposes A retrospective consecutive analysis of the major partial costs involved in revision TKA for aseptic and septic failure was undertaken to compare 1) demographic and clinical characteristics, and 2) variable direct costs (from a hospital department’s perspective) between patients who underwent single-stage aseptic and two-stage septic revision of TKA in a hospital providing maximum care. We separately analyze the explantation and implantation procedures in septic revision cases and identify the major cost drivers of knee revision operations. Methods A total of 106 consecutive patients (71 aseptic and 35 septic) was included. All direct costs of diagnosis, surgery, and treatment from the hospital department’s perspective were calculated as real purchase prices. Personnel involvement was calculated in units of minutes. Results Aseptic versus septic revisions differed significantly in terms of length of hospital stay (15.2 vs. 39.9 days), number of reported secondary diagnoses (6.3 vs. 9.8) and incision-suture time (108.3 min vs. 193.2 min). The management of septic revision TKA was significantly more expensive than that of aseptic failure ($12,223.79 vs. $6,749.43) (p costs of explantation stage ($4,540.46) were lower than aseptic revision TKA ($6,749.43) which were again lower than those of the septic implantation stage ($7,683.33). All mean costs of stays were not comparable as they differ significantly (p cost drivers were the cost of the implant and

  4. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  5. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  6. Evaluation of revised trauma score in poly- traumatized patients

    International Nuclear Information System (INIS)

    Ahmad, H.N.

    2004-01-01

    Objective: To determine the prognostic value and reliability of revised trauma score (RTS) in polytraumatized patients. Subjects and Methods: Thirty adult patients of road traffic accidents sustaining multisystem injuries due to high energy blunt trauma were managed according to the protocols of advanced trauma life support (ATLS) and from their first set of data RTS was calculated. Score of each patient was compared with his final outcome at the time of discharge from the hospital. Results: The revised trauma score was found to be a reliable predictor of prognosis of polytraumatized patients but a potentially weak predictor for those patients having severe injury involving a single anatomical region. The higher the RTS the better the prognosis of polytrauma patient and vice versa. Revised trauma score <8 turned out to be an indicator of severe injury with high mortality and morbidity and overall mortality in polytraumatized patients was 26.66%. However, RTS-6 was associated with 50% mortality. Conclusion: The revised trauma score is a reliable indicator of prognosis of polytraumatized patients. Therefore, it can be used for field and emergency room triage. (author)

  7. AAEC nuclear power projections

    International Nuclear Information System (INIS)

    Khoe, G.; Fredsall, J.; Scurr, I.; Plotnikoff, W.

    1981-01-01

    The nuclear power capacity projections developed in the May-June period of 1981 by the AAEC are presented. There have been downward revisions for nearly all countries with centrally planned economies. Projections for the year 2000 for the Western World have decreased in aggregate by 4.7% (27Gw) compared to those of 1980. However, this reduction is less than the previous estimate reduction and there appears to have been a stabilisation in the projection

  8. Beginning analog electronics through projects

    CERN Document Server

    Singmin, Andrew

    2001-01-01

    Analog electronics is the simplest way to start a fun, informative, learning program. Beginning Analog Electronics Through Projects, Second Edition was written with the needs of beginning hobbyists and students in mind. This revision of Andrew Singmin's popular Beginning Electronics Through Projects provides practical exercises, building techniques, and ideas for useful electronics projects. Additionally, it features new material on analog and digital electronics, and new projects for troubleshooting test equipment.Published in the tradition of Beginning Electronics Through Projects an

  9. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  10. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  11. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  12. Standard-Setters Versus Big4 Opinion, Concerning Iasb Revision Project of the Conceptual Framework for Financial Reporting. the Case of Presentation and Disclosures Chapter

    Directory of Open Access Journals (Sweden)

    Burca Valentin

    2015-07-01

    Full Text Available On the last decades the accounting system haven‘t been able to follow the dynamics of the economic systems generated by the globalization process. In order to reduce the lag between the demand of financial information and the offer of financial information, IASB has started numerous initiatives aiming the increase on the quality of the financial information. Among the current list of current IASB major projects there is also the project of revising the actual conceptual framework for financial reporting. This study is designed to give some directions that will be considered on the exposure draft of this project, analyzing the comment letters submitted by the members of ASAF and the Big4 as well. The study reveals the increasing importance the preparers and users give to the disclosures included on the notes to the primary financial statements. Moreover, on this study we emphasize several challenges that IASB has to face on issuing the exposure draft for this important project. Some of the main challenges refer to the narrow scope of the financial statements, the criteria used on classification, aggregation and offsetting, or the use of the materiality concept

  13. Project quality assurance plan for research and development services provided by Oak Ridge National Laboratory in support of the Hanford Grout Disposal Program

    Energy Technology Data Exchange (ETDEWEB)

    Spence, R.D.; Gilliam, T.M.

    1991-11-01

    This Project Quality Assurance Plan (PQAP) is being published to provide the sponsor with referenceable documentation for work conducted in support of the Hanford WHC Grout Disposal Program. This plan, which meets NQA-1 requirements, is being applied to work performed at Oak Ridge National Laboratory (ORNL) during FY 1991 in support of this program. It should also be noted that with minor revisions, this plan should be applicable to other projects involving research and development that must comply with NQA-1 requirements.

  14. Project quality assurance plan for research and development services provided by Oak Ridge National Laboratory in support of the Hanford Grout Disposal Program

    International Nuclear Information System (INIS)

    Spence, R.D.; Gilliam, T.M.

    1991-11-01

    This Project Quality Assurance Plan (PQAP) is being published to provide the sponsor with referenceable documentation for work conducted in support of the Hanford WHC Grout Disposal Program. This plan, which meets NQA-1 requirements, is being applied to work performed at Oak Ridge National Laboratory (ORNL) during FY 1991 in support of this program. It should also be noted that with minor revisions, this plan should be applicable to other projects involving research and development that must comply with NQA-1 requirements

  15. 75 FR 19467 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Science.gov (United States)

    2010-04-14

    ... Rules Revisions; 112(g) Revisions (Rule Project No. 98001-116-AI). Under the Settlement Agreement in... provisions that either prohibit future increases at the Qualified Facility, or ensure that any future... commenters do not want coal to stand in the way of a clean energy future in Texas. Strong rules are needed to...

  16. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  17. Accident consequence calculations for project W-058 safetyanalysis

    Energy Technology Data Exchange (ETDEWEB)

    Van Keuren, J.C.

    1997-06-10

    Accident consequence analyses have been performed for Project W-058, the Replacement Cross Site Transfer System. using the assumption and analysis techniques developed for the Tank Remediation Waste system Basis for Interim Operation. most potential accident involving the FISTS are bounded by the TWRS BIO analysis. However, the spray leak and pool leak scenarios require revised analyses since the RCSTS design utilizes larger diameter pipe and higher pressures than those analyzed in the TWRS BIO. Also the volume of diversion box and vent station are larger than that assumed for the valve pits in the TWRS BIO, which effects results of sprays or spills into the pits. the revised analysis for the spray leak is presented in Section 2, for the above ground spill in Section 3, for the presented in Section 2, for the above ground spill in Section 3, for the subsurface spill forming a pool in Section 4, and for the subsurface pool remaining subsurface in Section 5. The conclusion from these sections are summarized below.

  18. 36 CFR 1210.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... may, at its option, restrict the transfer of funds among direct cost categories or programs, functions... or the objective of the project or program (even if there is no associated budget revision requiring... funds allotted for training allowances (direct payment to trainees) to other categories of expense. (8...

  19. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  20. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-03-01

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  1. 10 CFR 600.315 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... revisions: (1) The transfer of funds among direct cost categories, functions, and activities for awards in... change in the scope or the objective of the project or program (even if there is no associated budget... accordance with the applicable costs principles for Federal funds and the requirements applicable to the...

  2. 78 FR 46314 - Request for Revision of a Currently Approved Information Collection

    Science.gov (United States)

    2013-07-31

    ... development and job creation projects such as business start-up costs, business expansion, community... DEPARTMENT OF AGRICULTURE Rural Business-Cooperative Service Request for Revision of a Currently Approved Information Collection AGENCY: Rural Business-Cooperative Service, USDA. ACTION: Notice; proposed...

  3. The Situation-Specific Theory of Heart Failure Self-Care: Revised and Updated.

    Science.gov (United States)

    Riegel, Barbara; Dickson, Victoria Vaughan; Faulkner, Kenneth M

    2016-01-01

    Since the situation-specific theory of heart failure (HF) self-care was published in 2008, we have learned much about how and why patients with HF take care of themselves. This knowledge was used to revise and update the theory. The purpose of this article was to describe the revised, updated situation-specific theory of HF self-care. Three major revisions were made to the existing theory: (1) a new theoretical concept reflecting the process of symptom perception was added; (2) each self-care process now involves both autonomous and consultative elements; and (3) a closer link between the self-care processes and the naturalistic decision-making process is described. In the revised theory, HF self-care is defined as a naturalistic decision-making process with person, problem, and environmental factors that influence the everyday decisions made by patients and the self-care actions taken. The first self-care process, maintenance, captures those behaviors typically referred to as treatment adherence. The second self-care process, symptom perception, involves body listening, monitoring signs, as well as recognition, interpretation, and labeling of symptoms. The third self-care process, management, is the response to symptoms when they occur. A total of 5 assumptions and 8 testable propositions are specified in this revised theory. Prior research illustrates that all 3 self-care processes (ie, maintenance, symptom perception, and management) are integral to self-care. Further research is greatly needed to identify how best to help patients become experts in HF self-care.

  4. 32 CFR 34.15 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... prior approvals are not required): (i) The transfer of funds among direct cost categories, functions and... or the objective of the project or program (even if there is no associated budget revision requiring... principles for Federal funds and recipients' cost share or match, in § 34.17 and § 34.13, respectively. (iv...

  5. Inferring category characteristics from sample characteristics: inductive reasoning and social projection.

    Science.gov (United States)

    Krueger, J; Clement, R W

    1996-03-01

    Inductive reasoning involves generalization from sample observations to categories. This research examined the conditions under which generalizations go beyond the boundaries of the sampled categories. In Experiment 1, participants sampled colored chips from urns. When categorization was not salient, participants revised their estimates of the probability of a particular color even in urns they had not sampled. As categorization became more salient, generalization became limited to the sampled urn. In Experiment 2 the salience of categorization in social induction was varied. When social categorization was not salient, participants projected their own responses to test items to members of a laboratory group even when they themselves did not belong to this group. When salience increased, projection decreased among nonmembers but not among members. In Experiment 3 these results were replicated in a field setting.

  6. Stake holder involvement in the Canadian review process for uranium production projects in Northern Saskatchewan

    International Nuclear Information System (INIS)

    Underhill, D.

    2004-01-01

    This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by

  7. Revised accident source terms for light-water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Soffer, L. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-02-01

    This paper presents revised accident source terms for light-water reactors incorporating the severe accident research insights gained in this area over the last 15 years. Current LWR reactor accident source terms used for licensing date from 1962 and are contained in Regulatory Guides 1.3 and 1.4. These specify that 100% of the core inventory of noble gases and 25% of the iodine fission products are assumed to be instantaneously available for release from the containment. The chemical form of the iodine fission products is also assumed to be predominantly elemental iodine. These assumptions have strongly affected present nuclear air cleaning requirements by emphasizing rapid actuation of spray systems and filtration systems optimized to retain elemental iodine. A proposed revision of reactor accident source terms and some im implications for nuclear air cleaning requirements was presented at the 22nd DOE/NRC Nuclear Air Cleaning Conference. A draft report was issued by the NRC for comment in July 1992. Extensive comments were received, with the most significant comments involving (a) release fractions for both volatile and non-volatile species in the early in-vessel release phase, (b) gap release fractions of the noble gases, iodine and cesium, and (c) the timing and duration for the release phases. The final source term report is expected to be issued in late 1994. Although the revised source terms are intended primarily for future plants, current nuclear power plants may request use of revised accident source term insights as well in licensing. This paper emphasizes additional information obtained since the 22nd Conference, including studies on fission product removal mechanisms, results obtained from improved severe accident code calculations and resolution of major comments, and their impact upon the revised accident source terms. Revised accident source terms for both BWRS and PWRS are presented.

  8. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    Accident consequence analyses have been performed for Project W-058, the Replacement Cross Site Transfer System. using the assumption and analysis techniques developed for the Tank Remediation Waste system Basis for Interim Operation. most potential accident involving the FISTS are bounded by the TWRS BIO analysis. However, the spray leak and pool leak scenarios require revised analyses since the RCSTS design utilizes larger diameter pipe and higher pressures than those analyzed in the TWRS BIO. Also the volume of diversion box and vent station are larger than that assumed for the valve pits in the TWRS BIO, which effects results of sprays or spills into the pits. the revised analysis for the spray leak is presented in Section 2, for the above ground spill in Section 3, for the presented in Section 2, for the above ground spill in Section 3, for the subsurface spill forming a pool in Section 4, and for the subsurface pool remaining subsurface in Section 5. The conclusion from these sections are summarized below

  9. A revised econometric model of the domestic pallet market

    Science.gov (United States)

    Albert T. Schuler; Walter B. Wallin

    1983-01-01

    The purpose of this revised model is to project estimates of consumption and price of wooden pallets in the short term. This model differs from previous ones developed by Schuler and Wallin (1979 and 1980) in the following respects: The structure of the supply side of the market is more realistically identified (from an economic theory point of view) by including...

  10. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  11. Summary of case studies presented at the WPDD topical session on stakeholder involvement in decommissioning projects - november 14, 2005

    International Nuclear Information System (INIS)

    Metcalfe, Doug

    2006-01-01

    Full text of publication follows: Two case studies were presented on experiences with stakeholder involvement in decommissioning projects. The first paper described the development of the United Kingdom Atomic Energy Authority's (UKAEA) stakeholder involvement activities for the Dounreay Nuclear Reactor Test Establishment. The second paper presented the US Nuclear Regulatory Commission regulatory process for decommissioning that includes opportunities for public involvement. The presentation contrasted the stakeholder involvement for two commercial US nuclear power plants (NPPs) that completed decommissioning in 2005, the Trojan NPP and the Maine Yankee NPP. The two case studies highlighted the importance of involving stakeholders in decommissioning projects, and provide important lessons learned. The Dounreay case study demonstrated the UKAEA's determination and commitment to continuously improve its stakeholder engagement program. In 2002, the UKAEA set out to broaden its stakeholder program by improving both public understanding and participation. With regard to public understanding, the UKAEA committed to keep the public informed on decommissioning developments, and ensure that communication was in an understandable form. To improve participation, the UKAEA actively worked to identify and engage stakeholders. The UKAEA then made efforts to involve stakeholders in decision-making activities, including the use of stakeholder panels to discuss and consider options for specific aspects of the Dounreay decommissioning and site restoration plan. In 2004, the UKAEA commissioned an independent review of its stakeholder involvement program to assess the program's effectiveness and benchmark it against best practices. The program was found to be useful, and positive feedback was provided on the use of stakeholder panels and the UKAEA's determination to deliver a broad based and effective stakeholder strategy. Recommendations to UKAEA included involving stakeholders

  12. A revised Self- and Family Management Framework.

    Science.gov (United States)

    Grey, Margaret; Schulman-Green, Dena; Knafl, Kathleen; Reynolds, Nancy R

    2015-01-01

    Research on self- and family management of chronic conditions has advanced over the past 6 years, but the use of simple frameworks has hampered the understanding of the complexities involved. We sought to update our previously published model with new empirical, synthetic, and theoretical work. We used synthesis of previous studies to update the framework. We propose a revised framework that clarifies facilitators and barriers, processes, proximal outcomes, and distal outcomes of self- and family management and their relationships. We offer the revised framework as a model that can be used in studies aimed at advancing self- and family management science. The use of the framework to guide studies would allow for the design of studies that can address more clearly how self-management interventions work and under what conditions. Copyright © 2015 Elsevier Inc. All rights reserved.

  13. Revision hip replacement for recurrent Hydatid disease of the pelvis: a case report and review of the literature

    Directory of Open Access Journals (Sweden)

    Chandrasekar Coonoor R

    2010-03-01

    Full Text Available Abstract A case of a large recurrent hydatid cyst involving the right ilium and right hip treated with excision of the cyst, Total hip replacement and revision of the acetabular component with a Tripolar articulation for cyst recurrence and acetabular component loosening is presented along with a review of the relevant literature. To our knowledge there is no reported case of Total Hip replacement and revision for hydatid disease involving the bony pelvis.

  14. Are revised models better models? A skill score assessment of regional interannual variability

    Science.gov (United States)

    Sperber, Kenneth R.; Participating AMIP Modelling Groups

    1999-05-01

    Various skill scores are used to assess the performance of revised models relative to their original configurations. The interannual variability of all-India, Sahel and Nordeste rainfall and summer monsoon windshear is examined in integrations performed under the experimental design of the Atmospheric Model Intercomparison Project. For the indices considered, the revised models exhibit greater fidelity at simulating the observed interannual variability. Interannual variability of all-India rainfall is better simulated by models that have a more realistic rainfall climatology in the vicinity of India, indicating the beneficial effect of reducing systematic model error.

  15. Revising and editing for translators

    CERN Document Server

    Mossop, Brian

    2014-01-01

    Revising and Editing for Translators provides guidance and learning materials for translation students learning to edit texts written by others, and professional translators wishing to improve their self-revision ability or learning to revise the work of others. Editing is understood as making corrections and improvements to texts, with particular attention to tailoring them to the given readership. Revising is this same task applied to draft translations. The linguistic work of editors and revisers is related to the professional situations in which they work. Mossop offers in-depth coverage of a wide range of topics, including copyediting, style editing, structural editing, checking for consistency, revising procedures and principles, and translation quality assessment. This third edition provides extended coverage of computer aids for revisers, and of the different degrees of revision suited to different texts. The inclusion of suggested activities and exercises, numerous real-world examples, a proposed gra...

  16. Comparison of mode of failure between primary and revision total knee arthroplasties.

    Science.gov (United States)

    Liang, H; Bae, J K; Park, C H; Kim, K I; Bae, D K; Song, S J

    2018-04-01

    Cognizance of common reasons for failure in primary and revision TKA, together with their time course, facilitates prevention. However, there have been few reports specifically comparing modes of failure for primary vs. revision TKA using a single prosthesis. The goal of the study was to compare the survival rates, modes of failure, and time periods associated with each mode of failure, of primary vs. revision TKA. The survival rates, modes of failure, time period for each mode of failure, and risk factors would differ between primary and revision TKA. Data from a consecutive cohort comprising 1606 knees (1174 patients) of primary TKA patients, and 258 knees (224 patients) of revision TKA patients, in all of whom surgery involved a P.F.C ® prosthesis (Depuy, Johnson & Johnson, Warsaw, IN), was retrospectively reviewed. The mean follow-up periods of primary and revision TKAs were 9.2 and 9.8 years, respectively. The average 10- and 15-year survival rates for primary TKA were 96.7% (CI 95%,±0.7%) and 85.4% (CI 95%,±2.0%), and for revision TKA 91.4% (CI 95%,±2.5%) and 80.5% (CI 95%,±4.5%). Common modes of failure included polyethylene wear, loosening, and infection. The most common mode of failure was polyethylene wear in primary TKA, and infection in revision TKA. The mean periods (i.e., latencies) of polyethylene wear and loosening did not differ between primary and revision TKAs, but the mean period of infection was significantly longer for revision TKA (1.2 vs. 4.8 years, P=0.003). Survival rates decreased with time, particularly more than 10 years post-surgery, for both primary and revision TKAs. Continuous efforts are required to prevent and detect the various modes of failure during long-term follow-up. Greater attention is necessary to detect late infection-induced failure following revision TKA. Case-control study, Level III. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  17. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  18. A revision of the Academic Locus of Control Scale for College Students.

    Science.gov (United States)

    Curtis, Nicholas A; Trice, Ashton D

    2013-06-01

    This study presents a revision of Trice's (1985) Academic Locus of Control Scale for College Students. A principal component analysis involving 322 college students produced four factors including 21 of the original 28 items. Inspection of the seven items not included in the four-factor solution suggested that they could be eliminated on both content and technical grounds. The resulting revised scale was similar to the original scale with respect to its relations with GPA, attendance, and measures of Academic Entitlement, procrastination, depression, and anxiety.

  19. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  20. Loosening After Acetabular Revision

    DEFF Research Database (Denmark)

    Beckmann, Nicholas A.; Weiss, Stefan; Klotz, Matthias C.M.

    2014-01-01

    The best method of revision acetabular arthroplasty remains unclear. Consequently, we reviewed the literature on the treatment of revision acetabular arthroplasty using revision rings (1541 cases; mean follow-up (FU) 5.7 years) and Trabecular Metal, or TM, implants (1959 cases; mean FU 3.7 years...

  1. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Science.gov (United States)

    2011-06-29

    ... Western office responsible for marketing power from a specific project will identify the need for a long... appropriate level of NEPA review. Factors affecting the level of NEPA review include whether the project... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of...

  2. Gordon Craig's Scene Project: a history open to revision

    Directory of Open Access Journals (Sweden)

    Luiz Fernando

    2014-09-01

    Full Text Available The article proposes a review of Gordon Craig’s Scene project, an invention patented in 1910 and developed until 1922. Craig himself kept an ambiguous position whether it was an unfulfilled project or not. His son and biographer Edward Craig sustained that Craig’s original aims were never achieved because of technical limitation, and most of the scholars who examined the matter followed this position. Departing from the actual screen models saved in the Bibliothèque Nationale de France, Craig’s original notebooks, and a short film from 1963, I defend that the patented project and the essay published in 1923 mean, indeed, the materialisation of the dreamed device of the thousand scenes in one scene

  3. Being useful: achieving indigenous youth involvement in a community-based participatory research project in Alaska

    Directory of Open Access Journals (Sweden)

    Tara Ford

    2012-05-01

    Full Text Available Objectives. To report on a participatory research process in southwest Alaska focusing on youth involvement as a means to facilitate health promotion. We propose youth-guided community-based participatory research (CBPR as way to involve young people in health promotion and prevention strategizing as part of translational science practice at the community-level. Study design. We utilized a CBPR approach that allowed youth to contribute at all stages. Methods. Implementation of the CBPR approach involved the advancement of three key strategies including: (a the local steering committee made up of youth, tribal leaders, and elders, (b youth-researcher partnerships, and (c youth action-groups to translate findings. Results. The addition of a local youth-action and translation group to the CBPR process in the southwest Alaska site represents an innovative strategy for disseminating findings to youth from a research project that focuses on youth resilience and wellbeing. This strategy drew from two community-based action activities: (a being useful by helping elders and (b being proud of our village. Conclusions. In our study, youth informed the research process at every stage, but most significantly youth guided the translation and application of the research findings at the community level. Findings from the research project were translated by youth into serviceable action in the community where they live. The research created an experience for youth to spend time engaged in activities that, from their perspectives, are important and contribute to their wellbeing and healthy living. Youth-guided CBPR meant involving youth in the process of not only understanding the research process but living through it as well.

  4. Graphic Display Development Program. Volume II, Revision 0. Appendices

    International Nuclear Information System (INIS)

    1984-12-01

    The objective of this project is to demonstrate the feasibility and utility of developing a set of graphic displays to support symptom-based emergency operating procedures (EOPs). Development of generic graphic displays is based on Revision 3 of the symptomatic Emergency Procedure Guidelines (EPGs) prepared by the BWR Owners' Group (BWROG), and development of plant-specific graphic displays is based on a set of emergency operating procedures developed from these EPGs

  5. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  6. The National Ignition Facility Project. Revision 1

    International Nuclear Information System (INIS)

    Paisner, J.A.; Campbell, E.M.; Hogan, W.J.

    1994-01-01

    The mission of the National Ignition Facility is to achieve ignition and gain in inertial confinement fusion targets in the laboratory. The facility will be used for defense applications such as weapons physics and weapons effects testing, and for civilian applications such as fusion energy development and fundamental studies of matter at high temperatures and densities. This paper reviews the design, schedule, and costs associated with the construction project

  7. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  8. Global Dynamical Systems Involving Generalized -Projection Operators and Set-Valued Perturbation in Banach Spaces

    Directory of Open Access Journals (Sweden)

    Yun-zhi Zou

    2012-01-01

    Full Text Available A new class of generalized dynamical systems involving generalized f-projection operators is introduced and studied in Banach spaces. By using the fixed-point theorem due to Nadler, the equilibrium points set of this class of generalized global dynamical systems is proved to be nonempty and closed under some suitable conditions. Moreover, the solutions set of the systems with set-valued perturbation is showed to be continuous with respect to the initial value.

  9. Overview of US heavy-ion fusion commercial electric power systems assessment project. Revision

    International Nuclear Information System (INIS)

    Dudziak, D.J.; Pendergrass, J.H.; Saylor, W.W.

    1986-01-01

    The US heavy-ion fusion (HIF) research program is oriented toward development of multiple-beam induction linacs. Over the last two years an assessment has been performed of the potential of HIF as a competitive commercial electric power source. This assessment involved several technology performance and cost issues (e.g., final beam transport system, target manufacturing, beam stability in reactor cavity environments, and reactor cavity clearing), as well as overall power plant systems integration and tradeoff studies. Results from parametric analyses using a systems code developed in the project show cost of electricity (COE) values comparable with COEs from other magnetic fusion and inertial confinement fusion (ICF) plant studies; viz, 50-60 mills/kWh (1985 dollars) for 1-GWe plants. Also, significant COE insensitivity to major accelerator, target, and reactor parameters was demonstrated

  10. 75 FR 27286 - Notice of Request for Revision of a Currently Approved Information Collection

    Science.gov (United States)

    2010-05-14

    ... development and job creation projects such as business start-up costs, business expansion, community... DEPARTMENT OF AGRICULTURE Rural Business-Cooperative Service Notice of Request for Revision of a Currently Approved Information Collection AGENCY: Rural Business-Cooperative Service, USDA. ACTION: Proposed...

  11. Job Satisfaction, Organizational Commitment and Job Involvement: The Mediating Role of Job Involvement.

    Science.gov (United States)

    Ćulibrk, Jelena; Delić, Milan; Mitrović, Slavica; Ćulibrk, Dubravko

    2018-01-01

    We conducted an empirical study aimed at identifying and quantifying the relationship between work characteristics, organizational commitment, job satisfaction, job involvement and organizational policies and procedures in the transition economy of Serbia, South Eastern Europe. The study, which included 566 persons, employed by 8 companies, revealed that existing models of work motivation need to be adapted to fit the empirical data, resulting in a revised research model elaborated in the paper. In the proposed model, job involvement partially mediates the effect of job satisfaction on organizational commitment. Job satisfaction in Serbia is affected by work characteristics but, contrary to many studies conducted in developed economies, organizational policies and procedures do not seem significantly affect employee satisfaction.

  12. Job Satisfaction, Organizational Commitment and Job Involvement: The Mediating Role of Job Involvement

    Science.gov (United States)

    Ćulibrk, Jelena; Delić, Milan; Mitrović, Slavica; Ćulibrk, Dubravko

    2018-01-01

    We conducted an empirical study aimed at identifying and quantifying the relationship between work characteristics, organizational commitment, job satisfaction, job involvement and organizational policies and procedures in the transition economy of Serbia, South Eastern Europe. The study, which included 566 persons, employed by 8 companies, revealed that existing models of work motivation need to be adapted to fit the empirical data, resulting in a revised research model elaborated in the paper. In the proposed model, job involvement partially mediates the effect of job satisfaction on organizational commitment. Job satisfaction in Serbia is affected by work characteristics but, contrary to many studies conducted in developed economies, organizational policies and procedures do not seem significantly affect employee satisfaction. PMID:29503623

  13. The revised International Commission on Radiological Protection (ICRP) dosimetric model for the human respiratory tract

    International Nuclear Information System (INIS)

    Bair, W.J.

    1992-05-01

    A task group has revised the dosimetric model of the respiratory tract used to calculate annual limits on intake of radionuclides. The revised model can be used to project respiratory tract doses for workers and members of the public from airborne radionuclides and to assess past exposures. Doses calculated for specific extrathoracic and thoracic tissues can be adjusted to account for differences in radiosensitivity and summed to yield two values of dose for the respiratory tract that are applicable to the ICRP tissue weighted dosimetry system

  14. National Ignition Facility project acquisition plan revision 1

    International Nuclear Information System (INIS)

    Clobes, A.R.

    1996-01-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager

  15. Functions and Requirements for Debris Removal System-Project A.2

    International Nuclear Information System (INIS)

    PRECECHTEL, D.R.

    1999-01-01

    This revision of the Functions and Requirements Document updates the approved Functions and Requirements for Debris Removal Subproject WHC-SD-SNF-FRD-009, Rev. 0. It has been revised in its entirety to reflect the current scope of work for Debris Removal as canisters and lids under the K Basin Projects work breakdown structure (WBS). In this revision the canisters and lids will be consider debris and a new set of Functions and Requirements have been developed to remove the canisters and lids from the basin

  16. The Fast Forward MBA in Project Management

    CERN Document Server

    Verzuh, Eric

    2011-01-01

    An updated and revised edition of the bestselling guide to managing projects For any professional responsible for coordinating projects among different departments, across executive levels, or with technical complexity, The Fast Forward MBA in Project Management offers comprehensive instruction on how to deliver on time and on budget. Get the step-by-step advice you need to find the right sponsor, clarify objectives, and set realistic schedules and budget projections. This Fourth Edition of the 200,000-copy bestseller now covers critical new topics including: software and IT projects, agile te

  17. Agencies revise standards for radiation protection

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    The article deals with a guideline, compiled by the IAEA, for radiation protection. The guidelines aim at the control of individual risk through specified limits, optimisation of protection and the justification of all practices involving exposure to radiation. The guideline is a revision of the 1967 publication of the IAEA, Basic safety standards for radiation protection. According to the document the main resposibility for radiation protection lies with the employer. The workers should be responsible for observing protection procedures and regulations for their own as well as others' safety

  18. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  19. Revision surgery due to magnet dislocation in cochlear implant patients: an emerging complication.

    Science.gov (United States)

    Hassepass, Frederike; Stabenau, Vanessa; Maier, Wolfgang; Arndt, Susan; Laszig, Roland; Beck, Rainer; Aschendorff, Antje

    2014-01-01

    To analyze the cause and effect of magnet dislocation in cochlear implant (CI) recipients requiring magnet revision surgery for treatment. Retrospective study. Tertiary referral center. Case reports from 1,706 CI recipients consecutively implanted from January 2000 to December 2011 were reviewed. The number of cases requiring magnet revision surgery was assessed. Revision surgery involving magnet removal or replacement was indicated in 1.23% (21/1,706), of all CI recipients. Magnet dislocation occurring during magnetic resonance tomography (MRI), at 1.5 Tesla (T), with the magnet in place and with the application of compression bandaging around the head, was the main cause for revision surgery in 47.62% (10/21) of the affected cases. All 10 cases were implanted with Cochlear Nucleus cochlear implants. These events occurred, despite adherence to current recommendations of the manufacturer. The present study underlines that MRI examination is the main cause of magnet dislocation. The use of compressive bandaging when using 1.5-T MRI does not eliminate the risk of magnet dislocation. Additional cautionary measures are for required for conditional MRI. We recommend X-ray examination after MRI to determine magnet dislocation and avoid major complications in all cases reporting pain during or after MRI. Additional research regarding silicon magnet pocket design for added retention is needed. Effective communication of guidelines for precautionary measures during MRI examination in CI patients is mandatory for all clinicians involved. MRI in CI recipients should be indicated with caution.

  20. Acetabular Cup Revision.

    Science.gov (United States)

    Kim, Young-Ho

    2017-09-01

    The use of acetabular cup revision arthroplasty is on the rise as demands for total hip arthroplasty, improved life expectancies, and the need for individual activity increase. For an acetabular cup revision to be successful, the cup should gain stable fixation within the remaining supportive bone of the acetabulum. Since the patient's remaining supportive acetabular bone stock plays an important role in the success of revision, accurate classification of the degree of acetabular bone defect is necessary. The Paprosky classification system is most commonly used when determining the location and degree of acetabular bone loss. Common treatment options include: acetabular liner exchange, high hip center, oblong cup, trabecular metal cup with augment, bipolar cup, bulk structural graft, cemented cup, uncemented cup including jumbo cup, acetabular reinforcement device (cage), trabecular metal cup cage. The optimal treatment option is dependent upon the degree of the discontinuity, the amount of available bone stock and the likelihood of achieving stable fixation upon supportive host bone. To achieve successful acetabular cup revision, accurate evaluation of bone defect preoperatively and intraoperatively, proper choice of method of acetabular revision according to the evaluation of acetabular bone deficiency, proper technique to get primary stability of implant such as precise grafting technique, and stable fixation of implant are mandatory.

  1. Failure of aseptic revision total knee arthroplasties.

    Science.gov (United States)

    Leta, Tesfaye H; Lygre, Stein Håkon L; Skredderstuen, Arne; Hallan, Geir; Furnes, Ove

    2015-02-01

    In Norway, the proportion of revision knee arthroplasties increased from 6.9% in 1994 to 8.5% in 2011. However, there is limited information on the epidemiology and causes of subsequent failure of revision knee arthroplasty. We therefore studied survival rate and determined the modes of failure of aseptic revision total knee arthroplasties. This study was based on 1,016 aseptic revision total knee arthroplasties reported to the Norwegian Arthroplasty Register between 1994 and 2011. Revisions done for infections were not included. Kaplan-Meier and Cox regression analyses were used to assess the survival rate and the relative risk of re-revision with all causes of re-revision as endpoint. 145 knees failed after revision total knee arthroplasty. Deep infection was the most frequent cause of re-revision (28%), followed by instability (26%), loose tibial component (17%), and pain (10%). The cumulative survival rate for revision total knee arthroplasties was 85% at 5 years, 78% at 10 years, and 71% at 15 years. Revision total knee arthroplasties with exchange of the femoral or tibial component exclusively had a higher risk of re-revision (RR = 1.7) than those with exchange of the whole prosthesis. The risk of re-revision was higher for men (RR = 2.0) and for patients aged less than 60 years (RR = 1.6). In terms of implant survival, revision of the whole implant was better than revision of 1 component only. Young age and male sex were risk factors for re-revision. Deep infection was the most frequent cause of failure of revision of aseptic total knee arthroplasties.

  2. Supporting the Creation and Publication of Reviewed and Tested Teaching Modules through the InTeGrate Project

    Science.gov (United States)

    Bruckner, M. Z.; Birnbaum, S. J.; Bralower, T. J.; Egger, A. E.; Fox, S.; Gosselin, D. C.; Iverson, E. A. R.; Manduca, C. A.; Mcconnell, D. A.; Steer, D. N.; Taber, J. J.

    2016-12-01

    InTeGrate is dedicated to providing robust curricular materials that increase Earth literacy among undergraduate students. As of August 2016, 14 modules that use an interdisciplinary approach to teach about Earth-related sustainability issues across the curriculum have been published, and 19 courses and modules are undergoing final revisions. Materials are designed for undergraduate courses and have been tested in a variety of disciplines including geoscience, engineering, humanities, ethics, and Spanish language courses. The materials were developed, tested, revised, and reviewed using a two-year, highly scaffolded process that involves meeting a series of checkpoints, and is supported by a team of experts who provide guidance and formative feedback throughout the process. A series of webinars also supported teams in the development process. Author teams comprise 3-6 faculty members from at least three different institutions. Authors work collaboratively in a templated webspace designed specifically for creating materials, and representatives from the InTeGrate leadership, assessment, and web teams support each group of authors. This support team provides guidance and feedback on content, pedagogy, and web layout as authors develop materials. Authors attend two face-to-face meetings, one at the beginning of the process and another after materials are piloted in authors' classes. These meetings serve to initially orient authors to the development process, including the rubric that will guide their work, and in making revisions following the piloting phase of the project. Authors report that the meetings also provide professional development experience wherein they learn about pedagogy from each other and team leaders. The bulk of the materials development occurs remotely, with teams meeting regularly via teleconference as they follow the project timeline. All materials undergo review against the Materials Design and Refinement Rubric to ensure they meet project

  3. Inclusive Briefing and User Involvement

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    Briefing is not just about specifying needs as requirements but also about evaluating how well design proposals fulfil needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the preproject stage to create a basis for the project decision and can include...... by top management. The article describes the briefing processes and the methods for user involvement, identifies problem areas and points out possible improvements. The author was actively involved in the project as deputy project director, with responsibility for the briefing process, and is now...... includes a literature study on briefing and user involvement in building projects, and presents a case study of a major building project of a new headquarters and media centre for the Danish Broadcasting Corporation in Copenhagen. The building project was actively used as part of a corporate change process...

  4. The revised Generalized Expectancy for Success Scale: a validity and reliability study.

    Science.gov (United States)

    Hale, W D; Fiedler, L R; Cochran, C D

    1992-07-01

    The Generalized Expectancy for Success Scale (GESS; Fibel & Hale, 1978) was revised and assessed for reliability and validity. The revised version was administered to 199 college students along with other conceptually related measures, including the Rosenberg Self-Esteem Scale, the Life Orientation Test, and Rotter's Internal-External Locus of Control Scale. One subsample of students also completed the Eysenck Personality Inventory, while another subsample performed a criterion-related task that involved risk taking. Item analysis yielded 25 items with correlations of .45 or higher with the total score. Results indicated high internal consistency and test-retest reliability.

  5. 75 FR 2846 - Plan Revision for Prescott National Forest, Yavapai and Coconino Counties, AZ

    Science.gov (United States)

    2010-01-19

    .... Finally, this notice briefly describes the applicable planning rule and how work done on the plan revision... addressed project specific needs and the balance addressed programmatic needs. Programmatic needs for... guidelines; Suitability of lands for timber production, grazing, and recreation opportunities; Monitoring and...

  6. Single-stage Acetabular Revision During Two-stage THA Revision for Infection is Effective in Selected Patients.

    Science.gov (United States)

    Fink, Bernd; Schlumberger, Michael; Oremek, Damian

    2017-08-01

    The treatment of periprosthetic infections of hip arthroplasties typically involves use of either a single- or two-stage (with implantation of a temporary spacer) revision surgery. In patients with severe acetabular bone deficiencies, either already present or after component removal, spacers cannot be safely implanted. In such hips where it is impossible to use spacers and yet a two-stage revision of the prosthetic stem is recommended, we have combined a two-stage revision of the stem with a single revision of the cup. To our knowledge, this approach has not been reported before. (1) What proportion of patients treated with single-stage acetabular reconstruction as part of a two-stage revision for an infected THA remain free from infection at 2 or more years? (2) What are the Harris hip scores after the first stage and at 2 years or more after the definitive reimplantation? Between June 2009 and June 2014, we treated all patients undergoing surgical treatment for an infected THA using a single-stage acetabular revision as part of a two-stage THA exchange if the acetabular defect classification was Paprosky Types 2B, 2C, 3A, 3B, or pelvic discontinuity and a two-stage procedure was preferred for the femur. The procedure included removal of all components, joint débridement, definitive acetabular reconstruction (with a cage to bridge the defect, and a cemented socket), and a temporary cemented femoral component at the first stage; the second stage consisted of repeat joint and femoral débridement and exchange of the femoral component to a cementless device. During the period noted, 35 patients met those definitions and were treated with this approach. No patients were lost to followup before 2 years; mean followup was 42 months (range, 24-84 months). The clinical evaluation was performed with the Harris hip scores and resolution of infection was assessed by the absence of clinical signs of infection and a C-reactive protein level less than 10 mg/L. All

  7. The Disgust Propensity and Sensitivity Scale - Revised : Its predictive value for avoidance behavior

    NARCIS (Netherlands)

    van Overveld, Mark; de Jong, Peter J.; Peters, Madelon L.

    Disgust propensity appears involved in psychopathology. However, current disgust propensity indices display inflated correlations with psychopathology indices due to conceptual overlap. The recently developed Disgust Propensity and Sensitivity Scale - Revised (DPSS-R) is unique in that it measures

  8. Projecting Fatalities in Crashes Involving Older Drivers, 2000-2025

    Energy Technology Data Exchange (ETDEWEB)

    Hu, P.S.

    2001-03-23

    As part of this research effort, we developed a new methodology for projecting elderly traffic crash fatalities. This methodology separates exposure to crashes from crash risk per se, and further divides exposure into two components, the number of miles driven and the likelihood of being a driver. This component structure permits conceptually different determinants of traffic fatalities to be projected separately and has thorough motivation in behavioral theory. It also permits finer targeting of particular aspects of projections that need improvement and closer linking of projections to possible policy instruments for influencing them.

  9. Revision of the Euratom basic safety standards directive-current status

    International Nuclear Information System (INIS)

    Mundig, S.

    2011-01-01

    The European Commission is currently developing a revised Euratom Basic Safety Standards (BSS) Directive covering two major objectives: the consolidation of existing Euratom Radiation Protection legislation and the revision of the Euratom BSS. The consolidation will merge the following five Directives into one single Directive: the BSS Directive, the Medical Exposures Directive, the Public Information Directive, the Outside Workers Directive and the Directive on the Control of high-activity sealed radioactive sources and orphan sources. The revision of the Euratom BSS will take account of the latest recommendations by the International Commission on Radiological Protection and shall improve clarity of the requirements where appropriate. It is planned to introduce more binding requirements on natural radiation sources, on criteria for exemption and clearance, and on the cooperation between Member States for emergency planning and response. The provisions for regulatory control of planned exposure situations foresee a graded approach commensurate to the magnitude and likelihood of exposures from a practice. Finally, the new BSS shall take account of recent scientific developments. One additional goal is to achieve greater harmonisation between the Euratom BSS and the international BSS. While the requirements on the protection of workers, apprentices and students remain nearly unchanged, the revised BSS will clarify the roles and responsibilities of services and experts involved in technical and practical aspects of radiation protection, such as the occupational health services, the dosimetry services, the radiation protection expert and the medical physics expert. The requirements in the BSS on individual monitoring of category A workers remain unchanged, but the existing guidance on individual monitoring was revised and updated-the technical recommendations for monitoring individuals occupationally exposed to external radiation are published by the European

  10. UMTRA Surface Project management action process document: Final. Revision 2

    International Nuclear Information System (INIS)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites

  11. UMTRA Surface Project management action process document: Final. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  12. Occupational exposures worldwide and revision of international standards for protection

    International Nuclear Information System (INIS)

    Czarwinski, R.; Crick, M. J.

    2011-01-01

    United Nations Scientific Committee on the Effects of Atomic Radiation (UNSCEAR) has become the world authority on the levels and effects of ionising radiation. Since 1975, UNSCEAR has evaluated inter alia the level of occupational exposure worldwide. Based on revised questionnaires, more detailed information is now available. The results of the last evaluation (1995-2002) will be shown in the paper. Lessons learned from the responses by UN Member States will be given, as well as an outline of plans for data collection in future cycles. The requirements for protection against exposure to ionising radiation of workers, the public and patients are established in the International Basic Safety Standards for Protection against Ionising Radiation and for the Safety of Radiation Sources (BSS), published in 1996. As a result of a review of the BSS in 2006, the International Atomic Energy Agency (IAEA) started a process for the revision of these standards in 2007. International organisations including the joint sponsoring organisations of the BSS-IAEA, FAO, ILO, OECD/NEA, PAHO and WHO-as well as potential new joint sponsoring organisations of the revised BSS-the European Commission and UNEP-were involved from the beginning in the revision process. The paper also provides a summary of the status of the Draft Revised BSS and describes the new format. The paper focuses, in particular, on requirements for the protection of workers as well as record keeping requirements, which provide the legal basis for the collection of specific data; these data are of the type that can be used by UNSCEAR. (authors)

  13. Kinder Lernen Deutsch. Materials Project Part I. Revised.

    Science.gov (United States)

    American Association of Teachers of German.

    The Kinder Lernen Deutsch (LKD) materials evaluation project identifies materials appropriate for the elementary school German classrooms in grades K-8. This guide consists of an annotated bibliography, with ratings, of these materials. The guiding principles by which the materials were assessed were: use of the communicative approach; integration…

  14. Bibliocable. Revised Edition.

    Science.gov (United States)

    Cable Television Information Center, Washington, DC.

    This selective, annotated bibliography is a revision of the original published in 1972 (ED 071 402). Some 104 books, articles, and reports included here deal with access, applications, franchising, regulation, technology, and other aspects of cable television. The listings are of two types in each category. First are revisions of the original…

  15. Emerging Societal Involvement in City Management : the case of Cape Town

    Directory of Open Access Journals (Sweden)

    Neil Dewar

    1999-02-01

    Full Text Available Since the advent of full participatory democracy in South Africa in April 1994, a fundamental revision of the norms, values and practices of urban management has occurred. A central feature of this is expressed commitment to greater transparency and public participation in decision-making and project execution. Manegerial practice has moved from being essentially technocratic and control-oriented to more pluralistic and development-oriented. The previously disenfranchised and largely impoverished sectors of the community have moved from exclusion and confrontation toward greater involvement and empowerment. This has not been without problems however. The current status of community participation in Cape Town is reviewed and explored against a theoretical model. The conclusion drawn is that, political impediments notwithstanding, a considerable energy and momentum has been generated at local level in civil society towards the goal of improvement in social and living environments in the city.

  16. Korean Medication Algorithm Project for Bipolar Disorder: third revision

    Directory of Open Access Journals (Sweden)

    Woo YS

    2015-02-01

    Full Text Available Young Sup Woo,1 Jung Goo Lee,2,3 Jong-Hyun Jeong,1 Moon-Doo Kim,4 Inki Sohn,5 Se-Hoon Shim,6 Duk-In Jon,7 Jeong Seok Seo,8 Young-Chul Shin,9 Kyung Joon Min,10 Bo-Hyun Yoon,11 Won-Myong Bahk1 1Department of Psychiatry, College of Medicine, The Catholic University of Korea, Seoul, South Korea; 2Department of Psychiatry, Inje University Haeundae Paik Hospital, Busan, South Korea;3Paik Institute for Clinical Research, Inje Univeristy, Busan, South Korea; 4Department of Psychiatry, Jeju National University Hospital, Jeju, South Korea; 5Department of Psychiatry, Keyo Hospital, Keyo Medical Foundation, Uiwang, South Korea; 6Department of Psychiatry, Soonchunhyang University Cheonan Hospital, Soonchunhyang University, Cheonan, South Korea; 7Department of Psychiatry, Sacred Heart Hospital, Hallym University, Anyang, South Korea; 8Department of Psychiatry, School of Medicine, Konkuk University, Chungju, South Korea; 9Department of Psychiatry, Kangbuk Samsung Hospital, School of Medicine, Sungkyunkwan University, Seoul, South Korea; 10Department of Psychiatry, College of Medicine, Chung-Ang University, Seoul, South Korea; 11Department of Psychiatry, Naju National Hospital, Naju, South Korea Objective: To constitute the third revision of the guidelines for the treatment of bipolar disorder issued by the Korean Medication Algorithm Project for Bipolar Disorder (KMAP-BP 2014. Methods: A 56-item questionnaire was used to obtain the consensus of experts regarding pharmacological treatment strategies for the various phases of bipolar disorder and for special populations. The review committee included 110 Korean psychiatrists and 38 experts for child and adolescent psychiatry. Of the committee members, 64 general psychiatrists and 23 child and adolescent psychiatrists responded to the survey. Results: The treatment of choice (TOC for euphoric, mixed, and psychotic mania was the combination of a mood stabilizer (MS and an atypical antipsychotic (AAP; the TOC for

  17. A mechanism for revising accreditation standards: a study of the process, resources required and evaluation outcomes.

    Science.gov (United States)

    Greenfield, David; Civil, Mike; Donnison, Andrew; Hogden, Anne; Hinchcliff, Reece; Westbrook, Johanna; Braithwaite, Jeffrey

    2014-11-21

    The study objective was to identify and describe the process, resources and expertise required for the revision of accreditation standards, and report outcomes arising from such activities. Secondary document analysis of materials from an accreditation standards development agency. The Royal Australian College of General Practitioners' (RACGP) documents, minutes and reports related to the revision of the accreditation standards were examined. The RACGP revision of the accreditation standards was conducted over a 12 month period and comprised six phases with multiple tasks, including: review methodology planning; review of the evidence base and each standard; new material development; constructing field trial methodology; drafting, trialling and refining new standards; and production of new standards. Over 100 individuals participated, with an additional 30 providing periodic input and feedback. Participants were drawn from healthcare professional associations, primary healthcare services, accreditation agencies, government agencies and public health organisations. Their expertise spanned: project management; standards development and writing; primary healthcare practice; quality and safety improvement methodologies; accreditation implementation and surveying; and research. The review and development process was shaped by five issues: project expectations; resource and time requirements; a collaborative approach; stakeholder engagement; and the product produced. The RACGP evaluation was that participants were positive about their experience, the standards produced and considered them relevant for the sector. The revision of accreditation standards requires considerable resources and expertise, drawn from a broad range of stakeholders. Collaborative, inclusive processes that engage key stakeholders helps promote greater industry acceptance of the standards.

  18. Remote material handling in the Plutonium Immobilization Project. Revision 1

    International Nuclear Information System (INIS)

    Brault, J.R.

    2000-01-01

    With the downsizing of the US and Russian nuclear stockpiles, large quantities of weapons-usable plutonium in the US are being declared excess and will be disposed of by the Department of Energy Fissile Materials Disposition Program. To implement this program, DOE has selected the Savannah River Site (SRS) for the construction and operation of three new facilities: pit disassembly and conversion; mixed oxide fuel fabrication; and plutonium immobilization. The Plutonium Immobilization Project (PIP) will immobilize a portion of the excess plutonium in a hybrid ceramic and glass form containing high level waste for eventual disposal in a geologic repository. The PIP is divided into three distinct operating areas: Plutonium Conversion, First Stage Immobilization, and Second Stage Immobilization. Processing technology for the PIP is being developed jointly by the Lawrence Livermore National Laboratory and Westinghouse Savannah River Company. This paper will discuss development of the automated unpacking and sorting operations in the conversion area, and the automated puck and tray handling operations in the first stage immobilization area. Due to the high radiation levels and toxicity of the materials to be disposed of, the PIP will utilize automated equipment in a contained (glovebox) facility. Most operations involving plutonium-bearing materials will be performed remotely, separating personnel from the radiation source. Source term materials will be removed from the operations during maintenance. Maintenance will then be performed hands on within the containment using glove ports

  19. Development of the EU Ecolabel Criteria and Revision of the EU Green Public Procurement Criteria for Cleaning Services

    OpenAIRE

    DE ALMEIDA FERREIRA NETO BELMIRA; WOLF Oliver; FIELD Bethany; JENKIN Nicola; TAM Max; BENJAMIN Oscar

    2016-01-01

    The objective of this project is to develop a new EU Ecolabel and revise the existing EU Green Public Procurement (GPP) criteria for professional cleaning services (hereafter referred to as cleaning services). This preliminary report investigates the market, operational and sustainability aspects of cleaning services, with a goal to develop a robust evidence base and prioritise key environmental and social issues to support the development of EU Ecolabel criteria and the revision of the EU GP...

  20. User and stakeholder involvement for relevant, reliable and robust local-scale climate projections in Norway

    Science.gov (United States)

    Neby, Simon; Sobolowski, Stefan

    2017-04-01

    How can users and stakeholders be actively involved with providing input to and using output from local-scale climate projections? How can the scientific community better understand the needs of local actors? And how should communication and cooperation efforts be organized? These are critical questions we aim to answer in a climate services project funded by the Norwegian Research Council (R3: Relevant, Reliable and Robust local-scale climate projections for Norway). The project takes into consideration not only the scientific issues in establishing useful local-scale climate projections, but also addresses the "usability gap" between climate information and decision-making. The lack of effective communication between scientists and user communities often result in outputs and products that are not matched with decision-relevant climate information. In the R3 project, the scientific participants actively engage with a range of users that have quite different information needs: municipalities, infrastructure developers, agriculture, energy producers, insurance companies, and more. In this particular presentation, we present our experiences concerning three specific issues that relate to the stakeholder-science interface: 1) Preferences are not clear-cut and pre-defined. In practice, this means that stakeholders often do not have precise information about their needs, nor precise information about how, where and whether their needs can be voiced. Similarly, science communities tend to presuppose that stakeholders are interested and have well-articulated needs, which is hardly the case. Collectively, that means that there is a need for an approach that guides the articulation and prioritization of preferences in a manner that integrates both scientific and stakeholder perspectives and takes the integrity of both perspectives seriously. 2) Technologies are unclear. Although information may be produced and used, past experiences, trial and error processes and pragmatic

  1. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  2. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  3. [Osteosynthesis and cup revision in periprosthetic acetabulum fractures using a Kocher-Langenbeck approach].

    Science.gov (United States)

    Schwabe, P; Märdian, S; Perka, C; Schaser, K-D

    2016-04-01

    Reconstruction/stable fixation of the acetabular columns to create an adequate periacetabular requirement for the implantation of a revision cup. Displaced/nondisplaced fractures with involvement of the posterior column. Resulting instability of the cup in an adequate bone stock situation. Periprosthetic acetabulum fractures with inadequate bone stock. Extended periacetabular defects with loss of anchorage options. Isolated periprosthetic fractures of the anterior column. Septic loosening. Dorsal approach. Dislocation of hip. Mechanical testing of inlaying acetabular cup. With unstable cup situation explantation of the cup, fracture fixation of acetabulum with dorsal double plate osteosynthesis along the posterior column. Cup revision. Hip joint reposition. Early mobilization; partial weight bearing for 12 weeks. Thrombosis prophylaxis. Clinical and radiological follow-ups. Periprosthetic acetabular fracture in 17 patients with 9 fractures after primary total hip replacement (THR), 8 after revision THR. Fractures: 12 due to trauma, 5 spontaneously; 7 anterior column fractures, 5 transverse fractures, 4 posterior column fractures, 1 two column fracture after hemiendoprosthesis. 5 type 1 fractures and 12 type 2 fractures. Operatively treated cases (10/17) received 3 reinforcement ring, 2 pedestal cup, 1 standard revision cup, cup-1 cage construct, 1 ventral plate osteosynthesis, 1 dorsal plate osteosynthesis, and 1 dorsal plate osteosynthesis plus cup revision (10-month Harris Hip Score 78 points). Radiological follow-up for 10 patients: consolidation of fractures without dislocation and a fixed acetabular cup. No revision surgeries during follow-up; 2 hip dislocations, 1 transient sciatic nerve palsy.

  4. Guidance document for revision of DOE Order 5820.2A, Radioactive Waste Technical Support Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Kudera, D.E.; McMurtrey, C.D.; Meagher, B.G.

    1993-04-01

    This document provides guidance for the revision of DOE Order 5820.2A, ``Radioactive Waste Management.`` Technical Working Groups have been established and are responsible for writing the revised order. The Technical Working Groups will use this document as a reference for polices and procedures that have been established for the revision process. The overall intent of this guidance is to outline how the order will be revised and how the revision process will be managed. In addition, this document outlines technical issues considered for inclusion by a Department of Energy Steering Committee.

  5. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  6. A revision of the genus Aphalloides (Digenea: Cryptogonimidae), parasites of European brackish water fishes

    Czech Academy of Sciences Publication Activity Database

    Kvach, Yuriy; Bryjová, Anna; Sasal, P.; Winkler, H. M.

    2017-01-01

    Roč. 116, č. 7 (2017), s. 1973-1980 ISSN 0932-0113 R&D Projects: GA ČR(CZ) GBP505/12/G112 Institutional support: RVO:68081766 Keywords : Aphalloides * Taxonomic revision * Zoogeography * Molecular study Subject RIV: EG - Zoology OBOR OECD: Parasitology Impact factor: 2.329, year: 2016

  7. Deep Borehole Emplacement Mode Hazard Analysis Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Sevougian, S. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-08-07

    This letter report outlines a methodology and provides resource information for the Deep Borehole Emplacement Mode Hazard Analysis (DBEMHA). The main purpose is identify the accident hazards and accident event sequences associated with the two emplacement mode options (wireline or drillstring), to outline a methodology for computing accident probabilities and frequencies, and to point to available databases on the nature and frequency of accidents typically associated with standard borehole drilling and nuclear handling operations. Risk mitigation and prevention measures, which have been incorporated into the two emplacement designs (see Cochran and Hardin 2015), are also discussed. A key intent of this report is to provide background information to brief subject matter experts involved in the Emplacement Mode Design Study. [Note: Revision 0 of this report is concentrated more on the wireline emplacement mode. It is expected that Revision 1 will contain further development of the preliminary fault and event trees for the drill string emplacement mode.

  8. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

  9. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    International Nuclear Information System (INIS)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document

  10. Individualized In-Service Teacher Education. (Project IN-STEP). Evaluation Report, Phase II.

    Science.gov (United States)

    Thurber, John C.

    Phase 2 of Project IN-STEP was conducted to revise, refine, and conduct further field testing of a new inservice teacher education model. The method developed (in Phase 1--see ED 003 905 for report) is an individualized, multi-media approach. Revision activities, based on feedback provided for Phase 1, include the remaking of six videotape…

  11. UMTRA project disposal cell cover biointrusion sensitivity assessment, Revision 1

    International Nuclear Information System (INIS)

    1995-10-01

    This study provides an analysis of potential changes that may take place in a Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cell cover system as a result of plant biointrusion. Potential changes are evaluated by performing a sensitivity analysis of the relative impact of root penetrations on radon flux out of the cell cover and/or water infiltration into the cell cover. Data used in this analysis consist of existing information on vegetation growth on selected cell cover systems and information available from published studies and/or other available project research. Consistent with the scope of this paper, no new site-specific data were collected from UMTRA Project sites. Further, this paper does not focus on the issue of plant transport of radon gas or other contaminants out of the disposal cell cover though it is acknowledged that such transport has the potential to be a significant pathway for contaminants to reach the environment during portions of the design life of a disposal cell where plant growth occurs. Rather, this study was performed to evaluate the effects of physical penetration and soil drying caused by plant roots that have and are expected to continue to grow in UMTRA Project disposal cell covers. An understanding of the biological and related physical processes that take place within the cover systems of the UMTRA Project disposal cells helps the U.S. Department of Energy (DOE) determine if the presence of a plant community on these cells is detrimental, beneficial, or of mixed value in terms of the cover system's designed function. Results of this investigation provide information relevant to the formulation of a vegetation control policy

  12. 50 CFR 81.6 - Project Agreement.

    Science.gov (United States)

    2010-10-01

    ...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM CONSERVATION OF ENDANGERED AND THREATENED..., the period of time necessary to accomplish the objectives, and both the Federal and State costs. All... Office of Management and Budget Circular No. A-95 (as revised). (d) The Project Agreement will follow...

  13. Project B-610 instrument data base. Revision 6

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The following technical information document contains the published data base listing for the instrumentation to be connected into the new MICON distributed control computer. Project B-610 PFP Instrument Upgrade (PFP HVAC Control Room Upgrade) will install the MICON system in PFP and provide for a new control room at the present site of the new SWP change room EDT-150750 1/11/93

  14. Quality assurance plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, K.A.; Rasch, K.A.; Reid, R.W.

    1996-11-01

    This document establishes the Quality Assurance Plan (QAP) for the National Guard Bureau Objective Supply Capability Adaptive Redesign (OSCAR) project activities under the Oak Ridge National Laboratory (ORNL) management. It defines the requirements and assigns responsibilities for ensuring, with a high degree of confidence, that project objectives will be achieved as planned. The QAP outlined herein is responsive to and meets the Quality Assurance Program standards for the U.S. Department of Energy (DOE), Lockheed Martin Energy Research Corporation and ORNL and the ORNL Computing, Robotics, and Education Directorate (CRE). This document is intended to be in compliance with DOE Order 5700.6C, Quality Assurance Program, and the ORNL Standard Practice Procedure, SPP X-QA-8, Quality Assurance for ORNL Computing Software. This standard allows individual organizations to apply the stated requirements in a flexible manner suitable to the type of activity involved. Section I of this document provides an introduction to the OSCAR project QAP; Sections 2 and 3 describe the specific aspects of quality assurance as applicable to the OSCAR project. Section 4 describes the project approach to risk management. The Risk Management Matrix given in Appendix A is a tool to assess, prioritize, and prevent problems before they occur. Therefore, the matrix will be reviewed and revised on a periodic basis.

  15. Project GICC-Rhone revised final report - short version february 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The GICC-Rhone project concerns the impacts on the french part of the Rhone basin, in the case of a climatic change which double the atmospheric CO 2 . This situation is possible for the year 2050. The document precises the place of the project in the general scientifical context, the planning and the engaged teams, the experimental methodology, the used and developed simulation, a discussion on the data uncertainties and the obtained results. (A.L.B.)

  16. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation. Volume 2; Revised

    Science.gov (United States)

    Mueller, James L. (Editor); Fargion, Giulietta S. (Editor); Trees, C.; Austin, R. W.; Pietras, C. (Editor); Hooker, S.; Holben, B.; McClain, Charles R.; Clark, D. K.; Yuen, M.

    2002-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the SIMBIOS Project. It supersedes the earlier version, and is organized into four parts: Introductory Background, Instrument Characteristics, Field Measurements and Data Analysis, Data Reporting and Archival. Changes in this revision include the addition of three new chapters: (1) Fundamental Definitions, Relationships and Conventions; (2) MOBY, A Radiometric Buoy for Performance Monitoring and Vicarious Calibration of Satellite Ocean Color Sensors: Measurement and Data Analysis Protocols; and (3) Normalized Water-Leaving Radiance and Remote Sensing Reflectance: Bidirectional Reflectance and Other Factors. Although the present document represents another significant, incremental improvement in the ocean optics protocols, there are several protocols that have either been overtaken by recent technological progress, or have been otherwise identified as inadequate. Revision 4 is scheduled for completion sometime in 2003. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational Project. The contributions are published as submitted, after only minor editing to correct obvious grammatical or clerical errors.

  17. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation. Volume 1; Revised

    Science.gov (United States)

    Mueller, James L. (Editor); Fargion, Giulietta (Editor); Mueller, J. L.; Trees, C.; Austin, R. W.; Pietras, C.; Hooker, S.; Holben, B.; McClain, Charles R.; Clark, D. K.; hide

    2002-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the SIMBIOS Project. It supersedes the earlier version, and is organized into four parts: Introductory Background, Instrument Characteristics, Field Measurements and Data Analysis, Data Reporting and Archival. Changes in this revision include the addition of three new chapters: (1) Fundamental Definitions, Relationships and Conventions; (2) MOBY, A Radiometric Buoy for Performance Monitoring and Vicarious Calibration of Satellite Ocean Color Sensors: Measurement and Data Analysis Protocols; and (3) Normalized Water-Leaving Radiance and Remote Sensing Reflectance: Bidirectional Reflectance and Other Factors. Although the present document represents another significant, incremental improvement in the ocean optics protocols, there are several protocols that have either been overtaken by recent technological progress, or have been otherwise identified as inadequate. Revision 4 is scheduled for completion sometime in 2003. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational Project. The contributions are published as submitted, after only minor editing to correct obvious grammatical or clerical errors.

  18. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  19. A revision of the genus Aphalloides (Digenea: Cryptogonimidae), parasites of European brackish water fishes

    Czech Academy of Sciences Publication Activity Database

    Kvach, Yuriy; Bryjová, A.; Sasal, P.; Winkler, H. M.

    2017-01-01

    Roč. 116, č. 7 (2017), s. 1973-1980 ISSN 0932-0113 R&D Projects: GA ČR(CZ) GBP505/12/G112 Institutional support: RVO:60077344 Keywords : Aphalloides * Taxonomic revision * Zoogeography * Molecular study Subject RIV: GJ - Animal Vermins ; Diseases, Veterinary Medicine OBOR OECD: Veterinary science Impact factor: 2.329, year: 2016

  20. 48 CFR 15.307 - Proposal revisions.

    Science.gov (United States)

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 15.307 Proposal revisions. (a) If an... allow proposal revisions to clarify and document understandings reached during negotiations. At the... submit a final proposal revision. The contracting officer is required to establish a common cut-off date...

  1. Revision 2 of the Program of NPP Krsko Decommissioning and SF and LILW Disposal

    International Nuclear Information System (INIS)

    Levanat, I.; Lokner, V.; Rapic, A.

    2010-01-01

    First joint Slovenian-Croatian Program of NPP Krsko Decommissioning and SF and LILW Disposal (DP) was completed in 2004 and formally adopted in 2005. As bilateral agreement on the NPP requires periodic revisions at least each 5 years, revision 2 of DP was started in September 2008, with the purpose to incorporate relevant developments since the 1st revision, to improve the level of details and reliability of DP, and to propose updated and more accurate cost estimates and appropriate financing models. In the first phase of the revision, new supporting studies for DP modules were prepared. Among these studies, the most demanding was the NPP Krsko specific Preliminary Decommissioning Plan (PDP), complying with the IAEA-recommended format, which included development of the NPP decommissioning inventory database. For upgrade of SF management, new and more detailed descriptions with improved cost estimates were prepared. Update of LILW disposal concept was based on new developments and projects prepared for the Slovenian repository. In the second phase of the revision, integrated DP scenarios were formulated and analyzed. They integrate NPP decommissioning together with RW and SF management/disposal into rationally inter-related sequences. Boundary conditions for this revision required: (a) that the reference scenario from the previous revision should be re-examined, with appropriate variations or new alternatives; (b) that the option of the NPP Krsko life extension should also be included; and (c) that the possibility of diverging interests of the contracting parties should also be analyzed (i.e. waste division and separate management). Finally, scenario evaluation is intended to compare the analyzed scenarios taking into account both their feasibility and estimated costs. It should provide the basis for determining future financing of DP, namely the annuities to be paid by the NPP Krsko owners into the national decommissioning funds.(author).

  2. Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    1986-09-01

    This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs

  3. A study on scar revision

    Directory of Open Access Journals (Sweden)

    Ashutosh Talwar

    2016-04-01

    Full Text Available Introduction: Scars are psychologically distressing for the patients and have an impact on the quality of life and self esteem of the patients. Scar revision is an aesthetic skill which is mastered by plastic surgeons and encroached now by dermatosurgeons. Scars on the face are aesthetically unacceptable and various techniques have been improvised for making a scar aesthetically acceptable. Various types of techniques are used for scar revision like W plasty, Z plasty and VY plasty. Aims: To see the efficacy of various scar revision techniques including Z plasty, VY plasty and W plasty in 30 patients with disfiguring scars. Methods: We selected twenty patients of disfiguring scars for the study. The scars from various causes including trauma and burns were included in our study. Various techniques of scar revision include Z plasty, W plasty and VY plasty were performed according to the type and site of scar. Results: Male: female was 1.5: 1. The scar revision surgery yielded excellent results with minimal complications including haematoma formation, secondary infection and delayed healing seen in 5% patients each. Regarding the efficacy of scar revision, excellent improvement was seen in 60% patients, moderate improvement was seen in 30% patients and mild improvement was seen in 10% patients. Conclusions: Dermatologists can employ a number of surgical scar revision techniques. While some are better suited to treat specific types of scars, they can be used in combination with each other or with adjunctive therapies to achieve optimal results.

  4. A revised limbic system model for memory, emotion and behaviour.

    Science.gov (United States)

    Catani, Marco; Dell'acqua, Flavio; Thiebaut de Schotten, Michel

    2013-09-01

    Emotion, memories and behaviour emerge from the coordinated activities of regions connected by the limbic system. Here, we propose an update of the limbic model based on the seminal work of Papez, Yakovlev and MacLean. In the revised model we identify three distinct but partially overlapping networks: (i) the Hippocampal-diencephalic and parahippocampal-retrosplenial network dedicated to memory and spatial orientation; (ii) The temporo-amygdala-orbitofrontal network for the integration of visceral sensation and emotion with semantic memory and behaviour; (iii) the default-mode network involved in autobiographical memories and introspective self-directed thinking. The three networks share cortical nodes that are emerging as principal hubs in connectomic analysis. This revised network model of the limbic system reconciles recent functional imaging findings with anatomical accounts of clinical disorders commonly associated with limbic pathology. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Structural analysis of the ITER Vacuum Vessel regarding 2012 ITER Project-Level Loads

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, J.-M., E-mail: jean-marc.martinez@live.fr [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Jun, C.H.; Portafaix, C.; Choi, C.-H.; Ioki, K.; Sannazzaro, G.; Sborchia, C. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Cambazar, M.; Corti, Ph.; Pinori, K.; Sfarni, S.; Tailhardat, O. [Assystem EOS, 117 rue Jacquard, L' Atrium, 84120 Pertuis (France); Borrelly, S. [Sogeti High Tech, RE2, 180 rue René Descartes, Le Millenium – Bat C, 13857 Aix en Provence (France); Albin, V.; Pelletier, N. [SOM Calcul – Groupe ORTEC, 121 ancien Chemin de Cassis – Immeuble Grand Pré, 13009 Marseille (France)

    2014-10-15

    Highlights: • ITER Vacuum Vessel is a part of the first barrier to confine the plasma. • ITER Vacuum Vessel as Nuclear Pressure Equipment (NPE) necessitates a third party organization authorized by the French nuclear regulator to assure design, fabrication, conformance testing and quality assurance, i.e. Agreed Notified Body (ANB). • A revision of the ITER Project-Level Load Specification was implemented in April 2012. • ITER Vacuum Vessel Loads (seismic, pressure, thermal and electromagnetic loads) were summarized. • ITER Vacuum Vessel Structural Margins with regards to RCC-MR code were summarized. - Abstract: A revision of the ITER Project-Level Load Specification (to be used for all systems of the ITER machine) was implemented in April 2012. This revision supports ITER's licensing by accommodating requests from the French regulator to maintain consistency with the plasma physics database and our present understanding of plasma transients and electro-magnetic (EM) loads, to investigate the possibility of removing unnecessary conservatism in the load requirements and to review the list and definition of incidental cases. The purpose of this paper is to present the impact of this 2012 revision of the ITER Project-Level Load Specification (LS) on the ITER Vacuum Vessel (VV) loads and the main structural margins required by the applicable French code, RCC-MR.

  6. 76 FR 2684 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2011-01-14

    ... construction, not to delay shovel ready projects by requiring entities, like Lake County, to revise their... thus displace the ``shovel ready'' status for this project. Further delay of this project would...

  7. Ghrelin fibers from lateral hypothalamus project to nucleus tractus solitaries and are involved in gastric motility regulation in cisplatin-treated rats.

    Science.gov (United States)

    Gong, Yanling; Liu, Yang; Liu, Fei; Wang, Shasha; Jin, Hong; Guo, Feifei; Xu, Luo

    2017-03-15

    Ghrelin can alleviate cancer chemotherapy-induced dyspepsia in rodents, though the neural mechanisms involved are not known. Therefore, ghrelin projections from the lateral hypothalamus (LH) and its involvement in the regulation of gastric motility in cisplatin-treated rats were investigated with a multi-disciplined approach. Retrograde tracing combined with fluoro-immunohistochemical staining were used to investigate ghrelin fiber projections arising from LH and projecting to nucleus tractus solitaries (NTS). Results revealed that ghrelin fibers originating in LH project to NTS. Expression of ghrelin and its receptor growth hormone secretagogue receptor (GHS-R1a) in LH and NTS were detected by Western Blot. 2days after cisplatin dosing, expression of ghrelin in LH decreased while GHS-R1a in both LH and NTS increased. In electrophysiological experiments, the effects of N-methyl-d-aspartate (NMDA) microinjection in LH on neuronal discharge of gastric distension-responsive neurons in NTS and gastric motility were assessed. NMDA in LH excited most of ghrelin-responsive gastric distension (GD)-sensitive neurons in NTS and promoted gastric motility. This effect was partially blocked by ghrelin antibody in NTS. Furthermore, the excitatory effects of NMDA in cisplatin-treated rats were weaker than those in saline-treated rats. Behaviorally, cisplatin induced a significant increase of kaolin consumption and decrease of food intake. These studies reveal a decreased expression of ghrelin in LH and up-regulation of GHS-R1a in LH and NTS, which are involved in the regulation of GD neuronal discharge in NTS and gastric motility. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  9. 76 FR 2683 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2011-01-14

    ... to delay shovel ready projects by requiring entities, like the IEUA, to revise their design and... the ``shovel ready'' status for this project. Further delay of this project would contravene the most...

  10. Ventriculoperitoneal shunt complications needing shunt revision in children: A review of 5 years of experience with 48 revisions

    Directory of Open Access Journals (Sweden)

    Rajendra K Ghritlaharey

    2012-01-01

    Full Text Available Background: The aim of this study was to review the management of ventriculoperitoneal (VP shunt complications in children. Patients and Methods: During the last 5 years (January 1, 2006 to December 31, 2010, 236 VP shunt operations were performed in children under 12 years of age; of these, 40 (16.94% developed shunt complications and those who underwent VP shunt revisions were studied. Results: This prospective study included 40 (28 boys and 12 girls children and required 48 shunt revisions. Complications following VP shunts that required shunt revisions were peritoneal catheter/peritoneal end malfunction (18, shunt/shunt tract infections (7, extrusion of peritoneal catheter through anus (5, ventricular catheter malfunction (4, cerebrospinal fluid (CSF leak from abdominal wound (4, shunt system failure (2, ventricular end/shunt displacement (2, CSF pseudocysts peritoneal cavity (2, extrusion of peritoneal catheter from neck, chest, abdominal scar and through umbilicus, one each. Four-fifth of these shunt complications occurred within 6 months of previous surgery. Surgical procedures done during shunt revisions in order of frequency were revision of peritoneal part of shunt (27, 56.25%, revision of entire shunt system (6, 12.5%, extra ventricular drainage and delayed re-shunt (5, 10.41%, shunt removal and delayed re-shunt (5, 10.41%, opposite side shunting (2, 4.16%, cysts excision and revision of peritoneal catheter (2, 4.16% and revision of ventricular catheter (1, 2.08%. The mortalities following VP shunt operations were 44 (18.64% and following shunt revisions were 4 (10%. Conclusions: VP shunt done for hydrocephalus in children is not only prone for complications and need for revision surgery but also associated with considerable mortality.

  11. UMTRA Surface Project management action process document. Final report: Revision 1

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC section 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project

  12. Learning with Multiple Representations: An Example of a Revision Lesson in Mathematics

    Science.gov (United States)

    Wong, Darren; Poo, Sng Peng; Hock, Ng Eng; Kang, Wee Loo

    2011-01-01

    We describe an example of learning with multiple representations in an A-level revision lesson on mechanics. The context of the problem involved the motion of a ball thrown vertically upwards in air and studying how the associated physical quantities changed during its flight. Different groups of students were assigned to look at the ball's motion…

  13. Cochlear implant revision surgeries in children.

    Science.gov (United States)

    Amaral, Maria Stella Arantes do; Reis, Ana Cláudia Mirândola B; Massuda, Eduardo T; Hyppolito, Miguel Angelo

    2018-02-16

    The surgery during which the cochlear implant internal device is implanted is not entirely free of risks and may produce problems that will require revision surgeries. To verify the indications for cochlear implantation revision surgery for the cochlear implant internal device, its effectiveness and its correlation with certain variables related to language and hearing. A retrospective study of patients under 18 years submitted to cochlear implant Surgery from 2004 to 2015 in a public hospital in Brazil. Data collected were: age at the time of implantation, gender, etiology of the hearing loss, audiological and oral language characteristics of each patient before and after Cochlear Implant surgery and any need for surgical revision and the reason for it. Two hundred and sixty-five surgeries were performed in 236 patients. Eight patients received a bilateral cochlear implant and 10 patients required revision surgery. Thirty-two surgeries were necessary for these 10 children (1 bilateral cochlear implant), of which 21 were revision surgeries. In 2 children, cochlear implant removal was necessary, without reimplantation, one with cochlear malformation due to incomplete partition type I and another due to trauma. With respect to the cause for revision surgery, of the 8 children who were successfully reimplanted, four had cochlear calcification following meningitis, one followed trauma, one exhibited a facial nerve malformation, one experienced a failure of the cochlear implant internal device and one revision surgery was necessary because the electrode was twisted. The incidence of the cochlear implant revision surgery was 4.23%. The period following the revision surgeries revealed an improvement in the subject's hearing and language performance, indicating that these surgeries are valid in most cases. Copyright © 2018 Associação Brasileira de Otorrinolaringologia e Cirurgia Cérvico-Facial. Published by Elsevier Editora Ltda. All rights reserved.

  14. 76 FR 18218 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2011-04-01

    ... delay projects that are ``shovel ready'' by requiring cities such as Salt Lake City to revise their... unreasonable delay and thus displace the ``shovel ready'' status for this project. To further delay project...

  15. Revising the WHO verbal autopsy instrument to facilitate routine cause-of-death monitoring

    Science.gov (United States)

    Leitao, Jordana; Chandramohan, Daniel; Byass, Peter; Jakob, Robert; Bundhamcharoen, Kanitta; Choprapawon, Chanpen; de Savigny, Don; Fottrell, Edward; França, Elizabeth; Frøen, Frederik; Gewaifel, Gihan; Hodgson, Abraham; Hounton, Sennen; Kahn, Kathleen; Krishnan, Anand; Kumar, Vishwajeet; Masanja, Honorati; Nichols, Erin; Notzon, Francis; Rasooly, Mohammad Hafiz; Sankoh, Osman; Spiegel, Paul; AbouZahr, Carla; Amexo, Marc; Kebede, Derege; Alley, William Soumbey; Marinho, Fatima; Ali, Mohamed; Loyola, Enrique; Chikersal, Jyotsna; Gao, Jun; Annunziata, Giuseppe; Bahl, Rajiv; Bartolomeus, Kidist; Boerma, Ties; Ustun, Bedirhan; Chou, Doris; Muhe, Lulu; Mathai, Matthews

    2013-01-01

    Objective Verbal autopsy (VA) is a systematic approach for determining causes of death (CoD) in populations without routine medical certification. It has mainly been used in research contexts and involved relatively lengthy interviews. Our objective here is to describe the process used to shorten, simplify, and standardise the VA process to make it feasible for application on a larger scale such as in routine civil registration and vital statistics (CRVS) systems. Methods A literature review of existing VA instruments was undertaken. The World Health Organization (WHO) then facilitated an international consultation process to review experiences with existing VA instruments, including those from WHO, the Demographic Evaluation of Populations and their Health in Developing Countries (INDEPTH) Network, InterVA, and the Population Health Metrics Research Consortium (PHMRC). In an expert meeting, consideration was given to formulating a workable VA CoD list [with mapping to the International Classification of Diseases and Related Health Problems, Tenth Revision (ICD-10) CoD] and to the viability and utility of existing VA interview questions, with a view to undertaking systematic simplification. Findings A revised VA CoD list was compiled enabling mapping of all ICD-10 CoD onto 62 VA cause categories, chosen on the grounds of public health significance as well as potential for ascertainment from VA. A set of 221 indicators for inclusion in the revised VA instrument was developed on the basis of accumulated experience, with appropriate skip patterns for various population sub-groups. The duration of a VA interview was reduced by about 40% with this new approach. Conclusions The revised VA instrument resulting from this consultation process is presented here as a means of making it available for widespread use and evaluation. It is envisaged that this will be used in conjunction with automated models for assigning CoD from VA data, rather than involving physicians. PMID

  16. 24 CFR 968.225 - Budget revisions.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Budget revisions. 968.225 Section... Fewer Than 250 Units) § 968.225 Budget revisions. (a) A PHA shall not incur any modernization cost in excess of the total HUD-approved CIAP budget. A PHA shall submit a budget revision, in a form prescribed...

  17. Benchmarking and validation activities within JEFF project

    OpenAIRE

    Cabellos O.; Alvarez-Velarde F.; Angelone M.; Diez C.J.; Dyrda J.; Fiorito L.; Fischer U.; Fleming M.; Haeck W.; Hill I.; Ichou R.; Kim D. H.; Klix A.; Kodeli I.; Leconte P.

    2017-01-01

    The challenge for any nuclear data evaluation project is to periodically release a revised, fully consistent and complete library, with all needed data and covariances, and ensure that it is robust and reliable for a variety of applications. Within an evaluation effort, benchmarking activities play an important role in validating proposed libraries. The Joint Evaluated Fission and Fusion (JEFF) Project aims to provide such a nuclear data library, and thus, requires a coherent and efficient be...

  18. Revision of the International Pharmaceutical Federation's Basel Statements on the future of hospital pharmacy: From Basel to Bangkok.

    Science.gov (United States)

    Vermeulen, Lee C; Moles, Rebekah J; Collins, Jack C; Gray, Andy; Sheikh, Abdul Latif; Surugue, Jacqueline; Moss, Robert J; Ivey, Marianne F; Stevenson, James G; Takeda, Yasuo; Ranjit, Eurek; Chaar, Betty; Penm, Jonathan

    2016-07-15

    The processes used to revise the 2008 Basel Statements on the future of hospital pharmacy are summarized, and the revised statements are presented. The process for revising the Basel Statements followed an approach similar to that used during their initial development. The Hospital Pharmacy Section (HPS) of the International Pharmaceutical Federation (FIP) revised the 2008 FIP Basel Statements in four phases, including a survey of hospital pharmacists worldwide, an internal review, online forums, and a face-to-face "World Café" workshop in Bangkok, Thailand. The global survey on the initial Basel Statements included input from 334 respondents from 62 countries. The majority of respondents agreed that most of the initial Basel Statements were acceptable as written and did not require revision. In total, 11 statements were judged by more than 10% of respondents as needing revision or deletion. The FIP HPS executive committee used the survey results to develop 69 initial revised draft statements. After an online discussion with the international hospital pharmacy community, including individuals from 28 countries representing all six World Health Organization regions, a final set of draft statements was prepared for the live discussion involving participants from 20 countries. The final 65 revised Basel Statements were voted on and accepted. Systematic revision of the FIP Basel Statements resulted in an updated reflection of aspirational goals for the future of hospital pharmacy practice. While this revision reflects the development of new goals for hospital pharmacy practice, the core principles of the Basel Statements remain an essential foundation for the discipline. Copyright © 2016 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  19. Special Analysis: Revision of Saltstone Vault 4 Disposal Limits (U)

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J

    2005-05-26

    New disposal limits have been computed for Vault 4 of the Saltstone Disposal Facility based on several revisions to the models in the existing Performance Assessment and the Special Analysis issued in 2002. The most important changes are the use of a more rigorous groundwater flow and transport model, and consideration of radon emanation. Other revisions include refinement of the aquifer mesh to more accurately model the footprint of the vault, a new plutonium chemistry model accounting for the different transport properties of oxidation states III/IV and V/VI, use of variable infiltration rates to simulate degradation of the closure system, explicit calculation of gaseous releases and consideration of the effects of settlement and seismic activity on the vault structure. The disposal limits have been compared with the projected total inventory expected to be disposed in Vault 4. The resulting sum-of-fractions of the 1000-year disposal limits is 0.2, which indicates that the performance objectives and requirements of DOE 435.1 will not be exceeded. This SA has not altered the conceptual model (i.e., migration of radionuclides from the Saltstone waste form and Vault 4 to the environment via the processes of diffusion and advection) of the Saltstone PA (MMES 1992) nor has it altered the conclusions of the PA (i.e., disposal of the proposed waste in the SDF will meet DOE performance measures). Thus a PA revision is not required and this SA serves to update the disposal limits for Vault 4. In addition, projected doses have been calculated for comparison with the performance objectives laid out in 10 CFR 61. These doses are 0.05 mrem/year to a member of the public and 21.5 mrem/year to an inadvertent intruder in the resident scenario over a 10,000-year time-frame, which demonstrates that the 10 CFR 61 performance objectives will not be exceeded. This SA supplements the Saltstone PA and supersedes the two previous SAs (Cook et al. 2002; Cook and Kaplan 2003).

  20. Revised National Pressure Ulcer Advisory Panel Pressure Injury Staging System: Revised Pressure Injury Staging System.

    Science.gov (United States)

    Edsberg, Laura E; Black, Joyce M; Goldberg, Margaret; McNichol, Laurie; Moore, Lynn; Sieggreen, Mary

    Our understanding of pressure injury etiology and development has grown in recent years through research, clinical expertise, and global interdisciplinary expert collaboration. Therefore, the National Pressure Ulcer Advisory Panel (NPUAP) has revised the definition and stages of pressure injury. The revision was undertaken to incorporate the current understanding of the etiology of pressure injuries, as well as to clarify the anatomical features present or absent in each stage of injury. An NPUAP-appointed Task Force reviewed the literature and created drafts of definitions, which were then reviewed by stakeholders and the public, including clinicians, educators, and researchers around the world. Using a consensus-building methodology, these revised definitions were the focus of a multidisciplinary consensus conference held in April 2016. As a result of stakeholder and public input, along with the consensus conference, important changes were made and incorporated into the new staging definitions. The revised staging system uses the term injury instead of ulcer and denotes stages using Arabic numerals rather than Roman numerals. The revised definition of a pressure injury now describes the injuries as usually occurring over a bony prominence or under a medical or other device. The revised definition of a Stage 2 pressure injury seeks to clarify the difference between moisture-associated skin damage and injury caused by pressure and/or shear. The term suspected has been removed from the Deep Tissue Pressure Injury diagnostic label. Each definition now describes the extent of tissue loss present and the anatomical features that may or may not be present in the stage of injury. These important revisions reflect the methodical and collaborative approach used to examine the available evidence and incorporate current interdisciplinary clinical expertise into better defining the important phenomenon of pressure injury etiology and development.

  1. Microcomputers and the Improvement of Revision Skills.

    Science.gov (United States)

    Balajthy, Ernest; And Others

    1987-01-01

    Discusses use of word processing software as an effective tool in writing and revision instruction, and describes the role of the teacher. Examples of exercises that encourage revision and of software designed to teach effective revision skills are reviewed. (MBR)

  2. Individual questions of financial control and revision

    Directory of Open Access Journals (Sweden)

    В. М. Глібко

    2015-05-01

    Full Text Available Problem setting. In modern conditions at investigation and gathering of proofs in criminal proceedings according to item 93 CPC of Ukraine collecting of proofs which is carried out by the criminal proceedings parties, victim is important, the representative of the legal person, in which relation carries out manufacture, including a way истребования and receptions from public authorities, local governments, the enterprises, establishments and organisations, official and physical persons of things, documents, data, conclusions of experts, conclusions of revisions and certificates of checks. Recent research and publications analisis. In scientific sources questions of carrying out of revisions S. B.Zhivko, V.V.Akimov, G.Demjanchuk, J.Buzdugan is considered. Paper objective. Article purpose is studying and definition of a place of revision among forms of inspection of the state control and use of results of revision in criminal proceedings. Paper main body. Off-schedule exit revision that is revision which is not provided in plans of work of body of the state financial control is considered and is spent at presence at least one of the circumstances listed in item 11 of the Law of Ukraine «About main principles of realisation of the state financial control in Ukraine». If revision is carried out on request of investigating bodies it is spent on the basis of the petition of the inspector and accepted by the results of consideration of this petition of the decision of the investigatory judge. The primary goal of revision on request of investigating bodies or on the basis of court definition is reception of proofs on business. Therefore the revision certificate admits the written proof as on the basis of its conclusion of the inspector, the public prosecutor receives the information on a perfect crime, abusing, and also on the persons who have committed a crime, on the period of commission of crime and an amount of damage. In criminal

  3. Outcome, revision rate and indication for revision following resurfacing hemiarthroplasty for osteoarthritis of the shoulder

    DEFF Research Database (Denmark)

    Rasmussen, J V; Polk, A; Sorensen, A K

    2014-01-01

    In this study, we evaluated patient-reported outcomes, the rate of revision and the indications for revision following resurfacing hemiarthroplasty of the shoulder in patients with osteoarthritis. All patients with osteoarthritis who underwent primary resurfacing hemiarthroplasty and reported...... to the Danish Shoulder Arthroplasty Registry (DSR), between January 2006 and December 2010 were included. There were 772 patients (837 arthroplasties) in the study. The Western Ontario Osteoarthritis of the Shoulder (WOOS) index was used to evaluate patient-reported outcome 12 months (10 to 14) post......-operatively. The rates of revision were calculated from the revisions reported to the DSR up to December 2011 and by checking deaths with the Danish National Register of Persons. A complete questionnaire was returned by 688 patients (82.2%). The mean WOOS was 67 (0 to 100). A total of 63 hemiarthroplasties (7...

  4. A note on the implementation of variational procedures involving Green's operators

    Energy Technology Data Exchange (ETDEWEB)

    Blakemore, M; Evans, G A; Hyslop, J

    1975-12-01

    The numerical implementation of a minimum energy principle for atoms and molecules involving integral operators is discussed. It is demonstrated that the use of unscaled trial functions may be as convenient computationally as the earlier procedures involving scaled trial functions and that the revised prescription has advantages, mainly in ease of interpretation and comparison of results. By way of illustration, some earlier calculations on the hydrogen ion are reconsidered and compared. (auth)

  5. Experimental in-vitro bone cements disintegration with ultrasonic pulsating water jet for revision arthroplasty

    Czech Academy of Sciences Publication Activity Database

    Hloch, Sergej; Foldyna, Josef; Pude, F.; Kloc, J.; Zeleňák, Michal; Hvizdoš, P.; Monka, P.; Smolko, I.; Ščučka, Jiří; Kozak, D.; Sedmak, A.; Mihalčinová, E.

    2015-01-01

    Roč. 22, č. 6 (2015), s. 1609-1616 ISSN 1330-3651 R&D Projects: GA MŠk ED2.1.00/03.0082; GA MŠk(CZ) LO1406 Institutional support: RVO:68145535 Keywords : bone cement * revision arthroplasty * ultrasonic pulsating water jet Subject RIV: JQ - Machines ; Tools Impact factor: 0.464, year: 2015 http://www.tehnicki-vjesnik.com/web/public/archive

  6. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA

  7. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  8. Circumcision revision in male children

    Directory of Open Access Journals (Sweden)

    Mohammed A. Al-Ghazo

    2006-08-01

    Full Text Available OBJECTIVE: To determine indications for circumcision revision and to identify the specialty of the person who performed unsatisfactory primary circumcision. MATERIALS AND METHODS: The authors reviewed medical records of 52 cases that underwent circumcision revision over a 6-year period (1998 to 2004. Sleeve surgical technique was used for revision in patients with redundant foreskin or concealed penis, penoplasty for partial or complete degloving of the penis and meatotomy for external meatal stenosis. The mean age of children was 32 months (range 6 months to 9 years. RESULTS: Most of unsatisfactory primary circumcisions (86.7% were performed by laymen. All patients who underwent circumcision revision had good to excellent cosmetic results. CONCLUSION: Primary circumcision performed by laymen carry a high complication rate and serious complications may occur. A period of training and direct supervision by physicians is required before allowing laymen to perform circumcision independently.

  9. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  10. Children's high-level writing skills: development of planning and revising and their contribution to writing quality.

    Science.gov (United States)

    Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel

    2014-06-01

    It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.

  11. The economic impact of revision otologic surgery.

    Science.gov (United States)

    Nadimi, Sahar; Leonetti, John P; Pontikis, George

    2016-03-01

    Revision otologic surgery places a significant economic burden on patients and the healthcare system. We conducted a retrospective chart analysis to estimate the economic impact of revision canal-wall-down (CWD) mastoidectomy. We reviewed the medical records of all 189 adults who had undergone CWD mastoidectomy performed by the senior author between June 2006 and August 2011 at Loyola University Medical Center in Maywood, Ill. Institutional charges and collections for all patients were extrapolated to estimate the overall healthcare cost of revision surgery in Illinois and at the national level. Of the 189 CWD mastoidectomies, 89 were primary and 100 were revision procedures. The total charge for the revision cases was $2,783,700, and the net reimbursement (collections) was $846,289 (30.4%). Using Illinois Hospital Association data, we estimated that reimbursement for 387 revision CWD mastoidectomies that had been performed in fiscal year 2011 was nearly $3.3 million. By extrapolating our data to the national level, we estimated that 9,214 patients underwent revision CWD mastoidectomy in the United States during 2011, which cost the national healthcare system roughly $76 million, not including lost wages and productivity. Known causes of failed CWD mastoidectomies that often result in revision surgery include an inadequate meatoplasty, a facial ridge that is too high, residual diseased air cells, and recurrent cholesteatoma. A better understanding of these factors can reduce the need for revision surgery, which could have a positive impact on the economic strain related to this procedure at the local, state, and national levels.

  12. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  13. UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements

  14. How to Revise, and Revise Really Well, for Premier Academic Journals

    DEFF Research Database (Denmark)

    LaPlaca, Peter J.; Lindgreen, Adam; Vanhamme, Joelle

    2018-01-01

    Most of the premier academic journals in all fields routinely have rejection rates of 80%, 95%, or higher. All journals prefer articles that make significant contributions to the field. Revising a manuscript and responding properly to the comments of reviewers and editors often is challenging....... This article discusses how to revise effectively a manuscript according to the (minor or major) comments of reviewers and editors for premier academic journals. We provide a series of tips for helping the authors in their endeavor, making the process less arduous and improving the possibility of a positive...

  15. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  16. Nevada Test Site Radiological Control Manual. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-02-09

    This document supersedes DOE/NV/25946--801, “Nevada Test Site Radiological Control Manual,” Revision 0 issued in October 2009. Brief Description of Revision: A minor revision to correct oversights made during revision to incorporate the 10 CFR 835 Update; and for use as a reference document for Tenant Organization Radiological Protection Programs.

  17. Harmonization of ethics in health technology assessment: a revision of the Socratic approach.

    Science.gov (United States)

    Hofmann, Bjørn; Droste, Sigrid; Oortwijn, Wija; Cleemput, Irina; Sacchini, Dario

    2014-01-01

    Ethics has been part of health technology assessment (HTA) from its beginning in the 1970s, and is currently part of HTA definitions. Several methods in ethics have been used in HTA. Some approaches have been developed especially for HTA, such as the Socratic approach, which has been used for a wide range of health technologies. The Socratic approach is used in several ways, and there is a need for harmonization to promote its usability and the transferability of its results. Accordingly, the objective of this study was to stimulate experts in ethics and HTA to revise the Socratic approach. Based on the current literature and experiences in applying methods in ethics, a panel of ethics experts involved in HTA critically analyzed the limitations of the Socratic approach during a face-to-face workshop. On the basis of this analysis a revision of the Socratic approach was agreed on after deliberation in several rounds through e-mail correspondence. Several limitations with the Socratic approach are identified and addressed in the revised version which consists of a procedure of six steps, 7 main questions and thirty-three explanatory and guiding questions. The revised approach has a broader scope and provides more guidance than its predecessor. Methods for information retrieval have been elaborated. The presented revision of the Socratic approach is the result of a joint effort of experts in the field of ethics and HTA. Consensus is reached in the expert panel on an approach that is considered to be more clear, comprehensive, and applicable for addressing ethical issues in HTA.

  18. The impact of consumer involvement in research: an evaluation of consumer involvement in the London Primary Care Studies Programme.

    Science.gov (United States)

    Wyatt, Katrina; Carter, Mary; Mahtani, Vinita; Barnard, Angela; Hawton, Annie; Britten, Nicky

    2008-06-01

    The value of consumer involvement in health services research is widely recognized. While there is a growing body of evidence about the principles of good consumer involvement, there is little research about the effect that involvement can have on the research. This evaluation assessed the level and impact of consumer involvement in the London Primary Care Studies Programme (LPCSP), all of whose individual projects had to demonstrate substantial involvement as a condition of funding. To evaluate consumer involvement in the LPSCP and understand what impact consumers had on the research process and outcomes. A multi-method case study approach was undertaken, using survey techniques, interviews, focus groups, observation and scrutiny of written documents. The overall data set comprised 61 questionnaires, 44 semi-structured interviews, 2 focus groups and 15 hours of observation of meetings. Eleven primary care-based research projects which together made up the LPCSP. An in-depth description of consumer involvement in the Programme was produced. Nine projects had consumers as co-applicants, four projects had been completed before the evaluation began and one was still ongoing at the time of the evaluation. Of the eight projects which have produced final reports, all met their aims and objectives. Consumers had had an additional impact in the research, in the initial design of the study, in recruitment of the research subjects, in developing data collection tools, in collecting the data, in analysis and disseminating the findings. Consumer involvement in National Health Service research is a relatively recent policy development and while there is an increasing amount of literature about how and why consumers should be involved in research, there is less evidence about the impact of such involvement. This evaluation provides evidence about the impact that consumers have not only on the research process but also on the outcomes of the research.

  19. Cosmic radiation and airline pilots. Exposure patterns of Norwegian SAS-pilots 1960 to 1994. Revised Version

    International Nuclear Information System (INIS)

    Tveten, U.

    1999-02-01

    The present report is a revised version of an earlier report (IFE/KR/E-96/008). The revision has been carried out since a completely new version of the computational tool has recently been released. All calculations have been redone. The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institute for Energy Technology (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). Originating from the Norwegian project, a number of similar projects have been started in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots employed by the the Scandinavian Airlines System (SAS). The result presented in this report (radiation dose rates for the different types of aircraft in the different years) were calculated with the most recent computer program for this purpose, the CARI-5E from the United States Civil Aviation Authority. The other major sources of information used as basis for this work is the collection of old SAS time tables found the the SAS Museum at Fornebu Airport in Oslo, and information provided by members of the Pilots Association in Norway

  20. Cosmic radiation and airline pilots. Exposure patterns of Norwegian SAS-pilots 1960 to 1994. Revised Version

    Energy Technology Data Exchange (ETDEWEB)

    Tveten, U

    1999-02-01

    The present report is a revised version of an earlier report (IFE/KR/E-96/008). The revision has been carried out since a completely new version of the computational tool has recently been released. All calculations have been redone. The work which is presented in this report is part of a Norwegian epidemiological project, carried out in cooperation between Institute for Energy Technology (IFE), the Norwegian Cancer Registry (NCR) and the Norwegian Radiation Protection Authority (NRPA). Originating from the Norwegian project, a number of similar projects have been started in a number of European countries. The present report lays the ground for estimation of individual exposure histories to cosmic radiation of pilots employed by the the Scandinavian Airlines System (SAS). The result presented in this report (radiation dose rates for the different types of aircraft in the different years) were calculated with the most recent computer program for this purpose, the CARI-5E from the United States Civil Aviation Authority. The other major sources of information used as basis for this work is the collection of old SAS time tables found the the SAS Museum at Fornebu Airport in Oslo, and information provided by members of the Pilots Association in Norway.

  1. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  2. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 8

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Bjornstad, B.N.; Fosmire, C.J.; Fowler, R.A. [and others

    1996-08-01

    This eighth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, historical, archaeological and cultural resources, socioeconomics, and noise. Chapter 6 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. The following sections were updated in this revision: climate and meteorology; ecology (threatened and endangered species section only); historical; archaeological and cultural resources; and all of chapter 6. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the hanford Site and its past activities by which to evaluate projected activities and their impacts.

  3. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 8

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Bjornstad, B.N.; Fosmire, C.J.; Fowler, R.A.

    1996-08-01

    This eighth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, historical, archaeological and cultural resources, socioeconomics, and noise. Chapter 6 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. The following sections were updated in this revision: climate and meteorology; ecology (threatened and endangered species section only); historical; archaeological and cultural resources; and all of chapter 6. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the hanford Site and its past activities by which to evaluate projected activities and their impacts

  4. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  5. Annual energy outlook 1993 with projections to 2010

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Information Administration's (EIA's) Annual Energy Outlook 1993 (AEO93) presents forecasts for energy prices, supply, demand, and imports over the period 1990 to 2010. These projections take into account existing legislation, including the Energy Policy Act of 1992. Even though the world oil market remains relatively tight, the long-term outlook for oil prices has been revised downward since the Annual Energy Outlook 1992 as expectations for both the Organization of Petroleum Exporting Countries (OPEC) and non-OPEC production potential have been revised upward. Domestic natural gas prices are also expected to be lower than projected last year, in part because of a more optimistic outlook for drilling technology. Finally, lower growth in the demand for electricity is expected because of the Energy Policy Act of 1992, which mandates efficiency standards for new energy-using equipment. These are the most striking differences between last year's EIA evaluation of long-term energy market trends and this year's evaluation

  6. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  7. Deconstructing Engineering Education Programmes: The DEEP Project to Reform the Mechanical Engineering Curriculum

    Science.gov (United States)

    Busch-Vishniac, Ilene; Kibler, Tom; Campbell, Patricia B.; Patterson, Eann; Guillaume, Darrell; Jarosz, Jeffrey; Chassapis, Constantin; Emery, Ashley; Ellis, Glenn; Whitworth, Horace; Metz, Susan; Brainard, Suzanne; Ray, Pradosh

    2011-01-01

    The goal of the Deconstructing Engineering Education Programmes project is to revise the mechanical engineering undergraduate curriculum to make the discipline more able to attract and retain a diverse community of students. The project seeks to reduce and reorder the prerequisite structure linking courses to offer greater flexibility for…

  8. Interdisciplinary Collaboration: Librarian Involvement in Grant Projects

    Science.gov (United States)

    Brandenburg, Marci D.; Cordell, Sigrid Anderson; Joque, Justin; MacEachern, Mark P.; Song, Jean

    2017-01-01

    Librarians are excellent research collaborators, although librarian participation is not usually considered, thereby making access to research funds difficult. The University of Michigan Library became involved in the university's novel funding program, MCubed, which supported innovative interdisciplinary research on campus, primarily by funding…

  9. Revised energy levels of singly ionized lanthanum

    Science.gov (United States)

    Güzelçimen, Feyza; Tonka, Mehdi; Uddin, Zaheer; Bhatti, Naveed Anjum; Windholz, Laurentius; Kröger, Sophie; Başar, Gönül

    2018-05-01

    Based on the experimental wavenumbers of 344 spectral lines from calibrated Fourier transform (FT) spectra as well as wavenumbers of 81 lines from the wavelength tables from literature, the energy of 115 fine structure levels of singly ionized lanthanum has been revised by weighted global fits. The classifications of the lines are provided by numerous previous investigations of lanthanum by different spectroscopic methods and authors. For the high accurate determination of the center of gravity wavenumbers from the experimental spectrum, the hyperfine constants of the involved levels have been taken into account, if possible. For the 94 levels with known hyperfine constants the accuracy of energy values is better than 0.01 cm-1. For 34 levels the magnetic dipole hyperfine constants A have been determined from FT spectra as part of this work. For four of these 34 levels even electric quadrupole hyperfine constants B could be estimated. For levels, which have experimentally unknown hyperfine constants and which are connected only by lines not found in the FT spectra but taken from literature, the uncertainties of energy values are about a factor of 10 higher. A list of all revised level energies together with a compilation of hyperfine structure data is given as well as a list of all lines used.

  10. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  11. Patterns in professional growth of science teachers involved in a team-based PD project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    and learning and subsequent discussion of this material. Repeated interviews were analyzed using an adapted version of the interconnected model of teachers’ professional growth. The results show various ways of experimenting with new approaches to be important for three of the teachers while a novice teacher...... the participants refer to. Conclusion is that there are professional growth patterns, especially a pattern involving experimenting, which have a forward-pointing potential to be used to inform school based PD. The results implicate that the same PD project can frame experimenting into practice in various tempi...... and with differentiated facilitation aligned to the individual teacher’s current needs and that external support of science resource teachers can be an integrated part of school based PD....

  12. Emotion Processes in Knowledge Revision

    Science.gov (United States)

    Trevors, Gregory J.; Kendeou, Panayiota; Butterfuss, Reese

    2017-01-01

    In recent years, a number of insights have been gained into the cognitive processes that explain how individuals overcome misconceptions and revise their previously acquired incorrect knowledge. The current study complements this line of research by investigating the moment-by-moment emotion processes that occur during knowledge revision using a…

  13. 75 FR 57597 - Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a Federal...

    Science.gov (United States)

    2010-09-21

    ... Revisions to the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal... railroad safety laws and regulations are necessary because many of FRA's civil penalties have not been..., et al. Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a...

  14. Involving Customer Relations in Contextual Design

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    1996-01-01

    This paper presents a case study in the form of a contextual design project, the aim of which was to design a system for a particular organization. The starting point in the case was a need in the organization for a specific system. The case involved an analysis of the organizations customer...... point of the design project, how the project was conducted, and which results it ended up with. This is followed by a discussion of the effects of, and lessons learned by, involving customer relations in contextual design....

  15. Revise and Re-evaluate Cross Cultural Understanding Curriculum at Akademi Bahasa Asing Balikpapan (Foriegn Language Academy of Balikpapan

    Directory of Open Access Journals (Sweden)

    Rachmi Sari Baso

    2014-02-01

    Full Text Available The study is about the project to revise and re-evaluate the unit of Cross Cultural Understanding curriculum which is taught in the Akademi Bahasa Asing Ballikpapan. The unit is for fifth semester students. The project aimed to provide students' perspectives of cross cultural differences in the workplace with the materials and knowledge that suitable for workplace demands. The information was gained by distributing questionnaires to 2 teachers and 2 employers of multinational companies in Balikpapan. The investigations for teachers were focused on the content, learning activities and materials of the current curriculum. The investigations for the employers were focused on their perspectives on the cross cultural understanding taught in the higher education. The project used Nicholls' cycle model that will be a useful tool to regularly evaluate curriculum based on the situational analysis. As the result, there were some of materials of American business cultural encounter should be revised to meet the companies demands and additional table manners in cultural perspectives should be included in the curriculum. Therefore, the new curriculum will be applied by these materials as the demands of the workplace.

  16. Revising the Depreciation and Investment Credit Lessons for Farm Management and Supervised Occupational Experience for Use in Missouri Programs of Vocational Agriculture. Final Report.

    Science.gov (United States)

    Rohrbach, Norman; And Others

    This project developed four lessons that reflect the 1981 tax laws as they relate to the use of investment credit and depreciation in farm accounting systems. Project staff reviewed tax laws and related materials and identified four lessons in farm management and supervised occupational experience that needed revision. Materials were then…

  17. Involving the public into HEP through IT challenges and projects

    CERN Document Server

    Adam Bourdarios, Claire; The ATLAS collaboration

    2016-01-01

    The ATLAS collaboration has recently setup three outreach projects and global challenges which have a strong IT component and could not have been envisaged without the growth of general public computing resources and network connectivity. HEP has exciting and difficult problems like the extraction of the Higgs boson signal, and at the same time data scientists have advanced algorithms. The goal of the Higgs Machine Learning (HiggsML) project was to bring the two together by a “challenge”: machine learning experts could compete online to obtain the best Higgs→ττ signal significance on a set of ATLAS fully simulated Monte Carlo signal and background events. The first challenge of this kind ran from May to September 2014, drawing considerable attention, and new projects followed in the context of the CERN open data initiative. Higgs Hunters is the only physics-related project hosted on a web-based citizen science platform called Zooniverse. Volunteers usually contributing to space, natural world and huma...

  18. The Revised Animal Preference Test: An Implicit Probe of Tendencies Toward Psychopathy.

    Science.gov (United States)

    Penzel, Ian B; Bair, Jessica; Liu, Tianwei; Robinson, Michael D

    2018-05-01

    At least some forms of interpersonal violence could follow from a vision of the self as a fierce, dominant creature. This should be particularly true when psychopathic (more proactive, less reactive) tendencies are involved. Possible relations of this type were examined in two studies (total N = 278) in which college student samples were presented with a new, structured version of an old projective test typically used in psychotherapy contexts. Participants were presented with predator-prey animal pairs (e.g., lion-zebra) that were not explicitly labeled as such. For each pair, the person was asked to choose the animal that they would more prefer to be. Participants who desired to be predator animals more often, on this Revised Animal Preference Test (RAPT), tended toward psychopathy to a greater extent. In Study 1, such relations were manifest in terms of correlations with psychopathic traits and with an interpersonal style marked by hostile dominance. Further analyses, though, revealed that predator self-identifications were more strongly related to primary psychopathy than secondary psychopathy. Study 2 replicated the interpersonal style correlates of the RAPT. In addition, photographs were taken of the participants in the second study and these photographs were rated for apparent hostility and dominance. As hypothesized, participants who wanted to be predator animals to a greater extent also appeared more hostile and dominant in their nonverbal behaviors. These studies suggest that projective preferences can be assessed in a reliable manner through the use of standardizing procedures. Furthermore, the studies point to some of the motivational factors that may contribute to psychopathy and interpersonal violence.

  19. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  20. 78 FR 64002 - South Farallon Islands Invasive House Mouse Eradication Project; Farallon National Wildlife...

    Science.gov (United States)

    2013-10-25

    ...-FF08RSFC00] South Farallon Islands Invasive House Mouse Eradication Project; Farallon National Wildlife... Statement (revised DEIS) for the South Farallon Islands Invasive House Mouse Eradication Project on the... non-native invasive house mice from the South Farallon Islands, part of the Farallon National Wildlife...

  1. Hanford analytical sample projections FY 1995--FY 2000. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, F.M.

    1994-12-02

    Sample projections have been categorized into 7 major areas: Environmental Restoration, Tank Waste Remediation, Solid Waste, Liquid Effluents, Site Monitoring, Industrial Hygiene, and General Process Support Programs. The estimates are through the Fiscal Year 2000 and are categorized by radiation level. The yearly sample projection for each program will be categorized as follows: Category 1: Non-Radioactive; Category 2: <1 mR/hr {beta}/{gamma}; <10 nCi/g {alpha}; Category 3: 1 mR/hr {beta}/{gamma} to <10 mR/hr {beta}/{gamma}; and <10 nCi/g {alpha}; Category 4: <10 mR/hr {beta}/{gamma}; and <200 nCi/g {alpha}; Category 5: 10 mR/hr {beta}/{gamma} to <100 mR/hr {beta}/{gamma}; and <200 nCi/g {alpha}; Category 6: >100 mR/hr {beta}/{gamma}; and Category 7: >200 nCi/g {alpha}.

  2. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  3. Student-initiated revision in child health.

    Science.gov (United States)

    Alfaham, M; Gray, O P; Davies, D P

    1994-03-01

    Most teaching of child health in Cardiff takes place in block attachments of 8 weeks. There is an introductory seminar of 2 days followed by a 6-week clinical attachment in a district general hospital in Wales, and then a revision period of one week designed to help students formalize and structure their basic knowledge and to clarify aspects of child health which they may have had difficulty in understanding. The revision programme has to take into account: the short time available, the small number of teaching staff, the most relevant basic knowledge and active participation by the student. This paper describes how this week has been improved through the use of student-initiated revision (SIR). The students' appraisal of this revision and in particular SIR is presented.

  4. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993

  5. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.; Burningham, A.; Chavez, P.

    1994-03-01

    This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project's quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal

  6. Solid waste integrated forecast technical (SWIFT) report: FY1997 to FY 2070, Revision 1

    International Nuclear Information System (INIS)

    Valero, O.J.

    1997-01-01

    This web site provides an up-to-date report on the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: an overview of Hanford-wide solid waste to be managed by the WM Project; program-level and waste class-specific estimates; background information on waste sources; and comparisons with previous forecasts and with other national data sources. This web site does not include: liquid waste (current or future generation); waste to be managed by the Environmental Restoration (EM-40) contractor (i.e., waste that will be disposed of at the Environmental Restoration Disposal Facility (ERDF)); or waste that has been received by the WM Project to date (i.e., inventory waste). The focus of this web site is on low-level mixed waste (LLMW), and transuranic waste (both non-mixed and mixed) (TRU(M)). Some details on low-level waste and hazardous waste are also provided. Currently, this web site is reporting data that was requested on 10/14/96 and submitted on 10/25/96. The data represent a life cycle forecast covering all reported activities from FY97 through the end of each program's life cycle. Therefore, these data represent revisions from the previous FY97.0 Data Version, due primarily to revised estimates from PNNL. There is some useful information about the structure of this report in the SWIFT Report Web Site Overview

  7. Completing the third person's perspective on patients' involvement in medical decision-making: approaching the full picture.

    Science.gov (United States)

    Kasper, Jürgen; Hoffmann, Frauke; Heesen, Christoph; Köpke, Sascha; Geiger, Friedemann

    2012-01-01

    Shared decision making is based on the idea of cooperation and partnership between patients and doctors. In this concept both parties may initiate and perform specific decision-making steps. However, the common observation-based instruments focus solely on doctors' behaviour. Content and quality of information provided to involve patients in medical decisions are hardly considered in evaluation of SDM. This study investigates the advantages of a revised observer inventory taking into account these aspects. Based on the OPTION scale, a more comprehensive observation-based inventory was developed, additionally considering both the patient-sided indicators for patient involvement and the criteria of evidence-based patient information. The inventory comprises three scales (doctor, patient, doctor-patient dyad) and 15 indicators each. Rater training and re-analyses of 76 consultations previously analysed using the OPTION scale were conducted. Convergent validities were calculated between the observer-based scales and the patients' ratings on the Shared Decision Making Questionnaire, the Decisional Conflict Scale and the Control Preference Scale. Interrater reliabilities of the revised scales were high (r=.87 to .74) and even higher when only the dyadic perspective was coded (.86). The revised inventory provided additional information on the involvement taking place. No substantive correlations were found between observation-based and patients' subjective judgments. The observers' perspective on patient involvement needs to consider patient activities. Inconsistencies of patients' and observers' judgements concerning patient participation need further investigation. Copyright © 2012. Published by Elsevier GmbH.

  8. Nozzle evaluation for Project W-314

    International Nuclear Information System (INIS)

    Galbraith, J.D.

    1998-01-01

    Revisions to the waste transfer system piping to be implemented by Project W-314 will eliminate the need to access a majority of interfarm jumper connections associated with specific process pits. Additionally, connections that formerly facilitated waste transfers from the Plutonium-Uranium Extraction (PUREX) Plant are no longer required. This document identified unneeded process pit jumper connections, describes former designated routing, denotes current status (i.e., open or blanked), and recommends appropriate disposition for all. Blanking of identified nozzles should be accomplished by Project W-314 upon installation of jumpers and acceptance by Tank Waste Remediation System (TWRS) Tank Farm Operations

  9. Revised licensee event report system

    International Nuclear Information System (INIS)

    Mays, G.T.; Poore, W.P.

    1985-01-01

    Licensee Event Reports (LERs) provide the basis for evaluating and assessing operating experience information from nuclear power plants. The reporting requirements for submitting LERs to the Nuclear Regulatory Commission have been revised. Effective Jan. 1, 1984, all events were to be submitted in accordance with 10 CFR 50.73 of the Code of Federal Regulations. Report NUREG-1022, Licensee Event Report System-Description of System and Guidelines for Reporting, describes the guidelines on reportability of events. This article summarizes the reporting requirements as presented in NUREG-1022, high-lights differences in data reported between the revised and previous LER systems, and presents results from a preliminary assessment of LERs submitted under the revised LER reporting system

  10. Clinical and Economic Burden of Revision Knee Arthroplasty

    Directory of Open Access Journals (Sweden)

    Mohit Bhandari

    2012-01-01

    Full Text Available Surgery is indicated for symptomatic knee osteoarthritis (OA when conservative measures are unsuccessful. High tibial osteotomy (HTO, unicompartmental knee arthroplasty (UKA, and total knee arthroplasty (TKA are surgical options intended to relieve knee OA pain and dysfunction. The choice of surgical intervention is dependent on several factors such as disease location, patient age, comorbidities, and activity levels. Regardless of surgical treatment, complications such as infection, loosening or lysis, periprosthetic fracture, and postoperative pain are known risks and are indications for revision surgery. The clinical and economic implications for revision surgery are underappreciated. Over 55,000 revision surgeries were performed in 2010 in the US, with 48% of these revisions in patients under 65 years. Total costs associated with each revision TKA surgery have been estimated to be in excess of $49,000. The current annual economic burden of revision knee OA surgery is $2.7 billion for hospital charges alone. By 2030, assuming a 5-fold increase in the number of revision procedures, this economic burden will exceed $13 billion annually. It is appealing to envision a therapy that could delay or obviate the need for arthroplasty. From an actuarial standpoint, this would have the theoretical downstream effect of substantially reducing the number of revision procedures. Although no known therapies currently meet these criteria, such a breakthrough would have a tremendous impact in lessening the clinical and economic burden of knee OA revision surgery.

  11. Local involvement in CDM biogas projects: Argentine experiences

    NARCIS (Netherlands)

    Serna Martín, A.; Dietz, T.

    2008-01-01

    Mitigating climate change and contributing to the sustainable development of host countries are the goals of the CDM. In order to achieve these goals, projects follow an implementation chain, which starts with the design and ends with the issuance of Certified Emission Reductions (CERs). During the

  12. Humeral windows in revision total elbow arthroplasty.

    Science.gov (United States)

    Peach, Chris A; Salama, Amir; Stanley, David

    2016-04-01

    The use of cortical windows for revision elbow arthroplasty has not previously been widely reported. Their use aids safe revision of a well fixed humeral prosthesis and can be used in the setting of dislocation, periprosthetic fracture or aseptic loosening of the ulnar component. We describe our technique and results of cortical windows in the distal humerus for revision elbow arthroplasty surgery.

  13. Diet History Questionnaire: Database Revision History

    Science.gov (United States)

    The following details all additions and revisions made to the DHQ nutrient and food database. This revision history is provided as a reference for investigators who may have performed analyses with a previous release of the database.

  14. Recurrent instability after revision anterior shoulder stabilization surgery.

    Science.gov (United States)

    Friedman, Lisa Genevra Mandeville; Griesser, Michael J; Miniaci, Anthony A; Jones, Morgan H

    2014-03-01

    The purpose of this study was to perform a systematic review of the literature to compare outcomes of revision anterior stabilization surgeries based on technique. This study also sought to compare the impact of bone defects on outcomes. A systematic review of the electronic databases PubMed, Cochrane Central Register of Controlled Trials, and Scopus was performed in July 2012 and March 2013. Of 345 articles identified in the search, 17 studies with Level I to IV Evidence satisfied the inclusion criteria and were analyzed according to PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) guidelines. Recurrent instability was defined as redislocation, resubluxation, or a positive apprehensive test after revision surgery. Procedures were categorized as arthroscopic Bankart repair, open Bankart repair, Bristow-Latarjet procedure, and other open procedures. In total, 388 shoulders were studied. Male patients comprised 74.1% of patients, 66.7% of cases involved the dominant shoulder, the mean age was 28.2 years, and the mean follow-up period was 44.2 months. The surgical procedures classified as "other open procedures" had the highest rate of recurrent instability (42.7%), followed by arthroscopic Bankart repair (14.7%), the Bristow-Latarjet procedure (14.3%), and open Bankart repair (5.5%). Inconsistent reporting of bone defects precluded drawing significant conclusions. A number of different procedures are used to address recurrent instability after a primary operation for anterior shoulder instability has failed. There is significant variability in the rate of recurrent instability after revision anterior shoulder stabilization surgery. Level IV, systematic review of Level I to IV studies. Copyright © 2014 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  15. Recent experiences with independent power projects

    International Nuclear Information System (INIS)

    Kline, R.H.; Fitzowitch, J.R.; Dalla-Longa, L.

    1999-01-01

    New opportunities are making it possible to develop independent power projects involving partnerships with the electric power industry, and the petroleum and natural gas industry . This paper described those opportunities, the impediments and the risks involved. Mercury Electric Corp. has been involved in power projects at remote gas field and oil field sites where they use of a turbogenerator which runs on flare gas to generate electricity. TransCanada Power's involvement in independent power projects includes the supply and transport of gas and their ability to provide gas fired combined cycle technology. They are involved in a project at Hermiston, Oregon and also in a cogeneration project in Medicine Hat, Alberta. The CanCarb City of Medicine Hat project makes use of waste heat at an industrial facility. 11 figs

  16. Revision surgery for failed thermal capsulorrhaphy.

    Science.gov (United States)

    Park, Hyung Bin; Yokota, Atsushi; Gill, Harpreet S; El Rassi, George; McFarland, Edward G

    2005-09-01

    With the failure of thermal capsulorrhaphy for shoulder instability, there have been concerns with capsular thinning and capsular necrosis affecting revision surgery. To report the findings at revision surgery for failed thermal capsulorrhaphy and to evaluate the technical effects on subsequent revision capsular plication. Case series; Level of evidence, 4. Fourteen patients underwent arthroscopic evaluation and open reconstruction for a failed thermal capsulorrhaphy. The cause of the failure, the quality of the capsule, and the ability to suture the capsule were recorded. The patients were evaluated at follow-up for failure, which was defined as recurrent subluxations or dislocations. The origin of the instability was traumatic (n = 6) or atraumatic (n = 8). At revision surgery in the traumatic group, 4 patients sustained failure of the Bankart repair with capsular laxity, and the others experienced capsular laxity alone. In the atraumatic group, all patients experienced capsular laxity as the cause of failure. Of the 14 patients, the capsule quality was judged to be thin in 5 patients and ablated in 1 patient. A glenoid-based capsular shift could be accomplished in all 14 patients. At follow-up (mean, 35.4 months; range, 22 to 48 months), 1 patient underwent revision surgery and 1 patient had a subluxation, resulting in a failure rate of 14%. Recurrent capsular laxity after failed thermal capsular shrinkage is common and frequently associated with capsular thinning. In most instances, the capsule quality does not appear to technically affect the revision procedure.

  17. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  18. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  19. Dual Headquarters Involvement in Multibusiness Firms

    DEFF Research Database (Denmark)

    Nell, Phillip Christopher; Kappen, Philip; Dellestrand, Henrik

    The strategy literature has shown that headquarters involve themselves into subsidiary operations to add value. Yet, little is known about the extent to which multiple headquarters do so. Therefore, we investigate antecedents of corporate and divisional headquarters’ involvement in innovation...... development projects of subsidiaries. Analyses of 85 innovation development projects reveal that dual innovation importance (innovation that is important for the division and the rest of the firm), and dual dual embeddedness (innovating subsidiary is embedded both within the division and in the rest...... of the firm) lead to greater dual headquarters involvement, especially when the innovation development network is large. The results contribute to the literature on complex parenting and theory of selective headquarters involvement....

  20. A Collaborative Approach to Defining the Usefulness of Impact: Lessons from a Knowledge Exchange Project Involving Academics and Social Work Practitioners

    Science.gov (United States)

    Wilkinson, Heather; Gallagher, Michael; Smith, Mark

    2012-01-01

    This paper reports on a knowledge exchange project involving academics and practitioners in six local authority social work departments. It contributes to recent debates about the coproduction of knowledge, presenting findings in three key areas: the importance of relationships for knowledge exchange; "what works" for practitioners…

  1. Conversion projects program plan WBS 7.4.9. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The mission of Conversion Projects (CP) is to transfer physical, intellectual, human and fiscal resources that advance the Hanford cleanup mission, support new missions, and that may inherently also benefit the economic transition of the region. This implements Function 6.0 of the Hanford Cleanup Technical Baseline

  2. Learning autonomy in writing class: Implementation of project-based learning in english for spesific purposes

    Science.gov (United States)

    Ayu Sukerti, G. N.; Yuliantini, Ny

    2018-01-01

    This research was aimed to analyze students’ attitude on learning autonomy through the implementation of project-based learning (PBL). Writing has been considered one of the most difficult competencies to master as it incorporates several integrated language skills. Thus, teaching writing in English for Specific Class posts a huge challenge as students often feel discouraged by the complex series of processes involved in producing a well-structured piece of writing. This research implemented PBL as the learning model to boost students’ learning outcomes and construct self-directed learning. Participants were 25 second semester students enrolled in a three-year undergraduate program in Informatics Management. The implementation of PBL in writing class contributed real advantages since it allowed students to collaboratively arrange outline in order to produce individual drafts and final essays. The study revealed that students were able to be involved in a more deep and autonomous learning as they helped each other during group discussion. The students autonomously engaged in the completion of the project in a more positive attitude. They also acquired more knowledge in the aspect of grammar and learned how to use language in proper context based on the feedbacks they got during revising their writing.

  3. Introductory Business Textbook Revision Cycles: Are They Getting Shorter?

    Science.gov (United States)

    Zinser, Brian; Brunswick, Gary

    2010-01-01

    The rate of textbook revision cycles is examined in light of the recent trend towards more rapid revisions (and adoptions of textbooks). The authors conduct background research to better understand the context for textbook revision cycles and the environmental forces that have been influencing what appears to be more rapid textbook revisions. A…

  4. Inferential revision in narrative texts: An ERP study.

    Science.gov (United States)

    Pérez, Ana; Cain, Kate; Castellanos, María C; Bajo, Teresa

    2015-11-01

    We evaluated the process of inferential revision during text comprehension in adults. Participants with high or low working memory read short texts, in which the introduction supported two plausible concepts (e.g., 'guitar/violin'), although one was more probable ('guitar'). There were three possible continuations: a neutral sentence, which did not refer back to either concept; a no-revise sentence, which referred to a general property consistent with either concept (e.g., '…beautiful curved body'); and a revise sentence, which referred to a property that was consistent with only the less likely concept (e.g., '…matching bow'). Readers took longer to read the sentence in the revise condition, indicating that they were able to evaluate their comprehension and detect a mismatch. In a final sentence, a target noun referred to the alternative concept supported in the revise condition (e.g., 'violin'). ERPs indicated that both working memory groups were able to evaluate their comprehension of the text (P3a), but only high working memory readers were able to revise their initial incorrect interpretation (P3b) and integrate the new information (N400) when reading the revise sentence. Low working memory readers had difficulties inhibiting the no-longer-relevant interpretation and thus failed to revise their situation model, and they experienced problems integrating semantically related information into an accurate memory representation.

  5. Programme for the Environmental Control at the Swedish Nuclear Facilities, Revision; Omgivningskontrollprogram foer de kaerntekniska anlaeggningarna, revision

    Energy Technology Data Exchange (ETDEWEB)

    Linden, Ann-Marie

    2004-12-01

    This report contains a revised version of the Environmental Monitoring Programme for the Swedish Nuclear Facilities. The revision is based on earlier experiences and evaluations. Some samples have been excluded. Some have been added, for example spruce cone and the food products apple and currant. The sediment samples of 2 cm length have been completed with samples of 10 cm length every fourth year to follow the migration of radio nuclides down the sediment layers over time. The revised Environmental Monitoring Programme is valid from the 1st of January 2005.

  6. Revising Nabokov Revising”

    Directory of Open Access Journals (Sweden)

    Marie Bouchet

    2010-10-01

    Full Text Available Nabokov revised his works as he translated them and, on another plane, canon revisionism has been having its backlash and provoked other refracting waves. The purpose of the conference was to advance Nabokov studies through the discussion of how our view of Nabokov’s standing and his works today should be revised, especially after the publication of The Original of Laura. However the conference was not confined to just this theme, since “revising” is a word rich with implications. To borrow s...

  7. Collateral Projections Innervate the Mammillary Bodies and Retrosplenial Cortex: A New Category of Hippocampal Cells

    Science.gov (United States)

    O’Mara, Shane M.

    2018-01-01

    To understand the hippocampus, it is necessary to understand the subiculum. Unlike other hippocampal subfields, the subiculum projects to almost all distal hippocampal targets, highlighting its critical importance for external networks. The present studies, in male rats and mice, reveal a new category of dorsal subiculum neurons that innervate both the mammillary bodies (MBs) and the retrosplenial cortex (RSP). These bifurcating neurons comprise almost half of the hippocampal cells that project to RSP. The termination of these numerous collateral projections was visualized within the medial mammillary nucleus and the granular RSP (area 29). These collateral projections included subiculum efferents that cross to the contralateral MBs. Within the granular RSP, the collateral projections form a particularly dense plexus in deep Layer II and Layer III. This retrosplenial termination site colocalized with markers for VGluT2 and neurotensin. While efferents from the hippocampal CA fields standardly collateralize, subiculum projections often have only one target site. Consequently, the many collateral projections involving the RSP and the MBs present a relatively unusual pattern for the subiculum, which presumably relates to how both targets have complementary roles in spatial processing. Furthermore, along with the anterior thalamic nuclei, the MBs and RSP are key members of a memory circuit, which is usually described as both starting and finishing in the hippocampus. The present findings reveal how the hippocampus simultaneously engages different parts of this circuit, so forcing an important revision of this network. PMID:29527569

  8. Deep prosthetic joint infection: a qualitative study of the impact on patients and their experiences of revision surgery

    Science.gov (United States)

    Blom, Ashley W; Whitehouse, Michael R; Gooberman-Hill, Rachael

    2015-01-01

    Objectives Around 1% of patients who have a hip replacement have deep prosthetic joint infection (PJI) afterwards. PJI is often treated with antibiotics plus a single revision operation (1-stage revision), or antibiotics plus a 2-stage revision process involving more than 1 operation. This study aimed to characterise the impact and experience of PJI and treatment on patients, including comparison of 1-stage with 2-stage revision treatment. Design Qualitative semistructured interviews with patients who had undergone surgical revision treatment for PJI. Patients were interviewed between 2 weeks and 12 months postdischarge. Data were audio-recorded, transcribed, anonymised and analysed using a thematic approach, with 20% of transcripts double-coded. Setting Patients from 5 National Health Service (NHS) orthopaedic departments treating PJI in England and Wales were interviewed in their homes (n=18) or at hospital (n=1). Participants 19 patients participated (12 men, 7 women, age range 56–88 years, mean age 73.2 years). Results Participants reported receiving between 1 and 15 revision operations after their primary joint replacement. Analysis indicated that participants made sense of their experience through reference to 3 key phases: the period of symptom onset, the treatment period and protracted recovery after treatment. By conceptualising their experience in this way, and through themes that emerged in these periods, they conveyed the ordeal that PJI represented. Finally, in light of the challenges of PJI, they described the need for support in all of these phases. 2-stage revision had greater impact on participants’ mobility, and further burdens associated with additional complications. Conclusions Deep PJI impacted on all aspects of patients’ lives. 2-stage revision had greater impact than 1-stage revision on participants’ well-being because the time in between revision procedures meant long periods of immobility and related psychological distress

  9. Developing Federated Services within Seismology: IRIS' involvement in the CoopEUS Project

    Science.gov (United States)

    Ahern, T. K.; Trabant, C. M.; Stults, M.

    2014-12-01

    As a founding member of the CoopEUS initiative, IRIS Data Services has partnered with five data centers in Europe and the UC Berkeley (NCEDC) in the US to implement internationally standardized web services to access seismological data using identical methodologies. The International Federation of Digital Seismograph Networks (FDSN) holds commission status within IASPEI/IUGG and as such is the international body that governs data exchange formats and access protocols within seismology. The CoopEUS project involves IRIS and UNAVCO as part of the EarthScope project and the European collaborators are all members of the European Plate Observing System (EPOS). CoopEUS includes one work package that attempts to coordinate data access between EarthScope and EPOS facilities. IRIS has worked with its partners in the FDSN to develop and adopt three key international service standards within seismology. These include 1) fdsn-dataselect, a service that returns time series data in a variety of standard formats, 2) fdsn-station, a service that returns related metadata about a seismic station in stationXML format, and 3) fdsn-event, a service that returns information about earthquakes and other seismic events in QuakeML format. Currently the 5 European data centers supporting these services include the ORFEUS Data Centre in the Netherlands, the GFZ German Research Centre for Geosciences in Potsdam, Germany, ETH Zurich in Switzerland, INGV in Rome, Italy, and the RESIF Data Centre in Grenoble France. Presently these seven centres can all be accessed using standardized web services with identical service calls and returns results in standardized ways. IRIS is developing an IRIS federator that will allow a client to seamlessly access information across the federated centers. Details and current status of the IRIS Federator will be presented.

  10. Revision of failed shoulder hemiarthroplasty to reverse total arthroplasty: analysis of 157 revision implants.

    Science.gov (United States)

    Merolla, Giovanni; Wagner, Eric; Sperling, John W; Paladini, Paolo; Fabbri, Elisabetta; Porcellini, Giuseppe

    2018-01-01

    There remains a paucity of studies examining the conversion of failed hemiarthroplasty (HA) to reverse total shoulder arthroplasty (RTSA). Therefore, the purpose of this study was to examine a large series of revision HA to RTSA. A population of 157 patients who underwent conversion of a failed HA to a revision RTSA from 2006 through 2014 were included. The mean follow-up was 49 months (range, 24-121 months). The indications for revision surgery included instability with rotator cuff insufficiency (n = 127) and glenoid wear (n = 30); instability and glenoid wear were associated in 38 cases. Eight patients with infection underwent 2-stage reimplantation. Patients experienced significant improvements in their preoperative to postoperative pain and shoulder range of motion (P surgeries, secondary to glenoid component loosening (n = 3), instability (n = 3), humeral component disassembly (n = 2), humeral stem loosening (n = 1), and infection (n = 2). Implant survivorship was 95.5% at 2 years and 93.3% at 5 years. There were 4 reoperations including axillary nerve neurolysis (n = 2), heterotopic ossification removal (n = 1), and hardware removal for rupture of the metal cerclage for an acromial fracture (n = 1). At final follow-up, there were 5 "at-risk" glenoid components. Patients experience satisfactory pain relief and recovery of reasonable shoulder function after revision RTSA from a failed HA. There was a relatively low revision rate, with glenoid loosening and instability being the most common causes. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  11. The NASA CSTI High Capacity Power Project

    International Nuclear Information System (INIS)

    Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Schmitz, P.; Vandersande, J.

    1992-01-01

    This paper describes the elements of NASA's CSTI High Capacity Power Project which include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timeliness recently developed

  12. Managing supplier involvement in new product development: a portfolio approach

    NARCIS (Netherlands)

    Wynstra, Finn; ten Pierick, E.

    2000-01-01

    Supplier involvement in new product development projects has become an increasingly popular method for improving project effectiveness (product costs and quality) and project efficiency (development costs and time). One of the key issues in managing this involvement is determining which type of

  13. Revision of the DELFIC Particle Activity Module

    Energy Technology Data Exchange (ETDEWEB)

    Hooper, David A [ORNL; Jodoin, Vincent J [ORNL

    2010-09-01

    The Defense Land Fallout Interpretive Code (DELFIC) was originally released in 1968 as a tool for modeling fallout patterns and for predicting exposure rates. Despite the continual advancement of knowledge of fission yields, decay behavior of fission products, and biological dosimetry, the decay data and logic of DELFIC have remained mostly unchanged since inception. Additionally, previous code revisions caused a loss of conservation of radioactive nuclides. In this report, a new revision of the decay database and the Particle Activity Module is introduced and explained. The database upgrades discussed are replacement of the fission yields with ENDF/B-VII data as formatted in the Oak Ridge Isotope Generation (ORIGEN) code, revised decay constants, revised exposure rate multipliers, revised decay modes and branching ratios, and revised boiling point data. Included decay logic upgrades represent a correction of a flaw in the treatment of the fission yields, extension of the logic to include more complex decay modes, conservation of nuclides (including stable nuclides) at all times, and conversion of key variables to double precision for nuclide conservation. Finally, recommended future work is discussed with an emphasis on completion of the overall radiation physics upgrade, particularly for dosimetry, induced activity, decay of the actinides, and fractionation.

  14. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    This document describes the calculations performed to determine the accident consequences for the W-058 safety analysis. Project W-058 is the replacement cross site transfer system (RCSTS), which is designed to transort liquid waste between the 200 W and 200 E areas. Calculations for RCSTS safety analyses used the same methods as the calculations for the Tank Waste Remediation System (TWRS) Basis for Interim Operation (BIO) and its supporting calculation notes. Revised analyses were performed for the spray and pool leak accidents since the RCSTS flows and pressures differ from those assumed in the TWRS BIO. Revision 1 of the document incorporates review comments

  15. A revision of the Haploporinae Nicoll, 1914 (Digenea: Haploporidae) from mullets (Mugilidae): Haploporus Looss, 1902 and Lecithobotrys Looss, 1902

    Czech Academy of Sciences Publication Activity Database

    Blasco-Costa, I.; Gibson, D. I.; Balbuena, J. A.; Raga, J. A.; Kostadinova, Aneta

    2009-01-01

    Roč. 73, č. 2 (2009), s. 107-133 ISSN 0165-5752 R&D Projects: GA MŠk LC522 Institutional research plan: CEZ:AV0Z60220518 Keywords : taxonomic revision * Haploporidae * Haploporus * Lecithobothrys * Mugilidae Subject RIV: GJ - Animal Vermins ; Diseases, Veterinary Medicine Impact factor: 0.911, year: 2009

  16. Stakeholder Salience in ERP Projects

    OpenAIRE

    Salhotra, Eashan

    2014-01-01

    The aim of this study is to examine stakeholder involvement in an Enterprise Resource Planning (ERP) System project that involves implementation and improvement of the implemented system. The study targets stakeholders, their classification, and their degree of importance during different phases of an ERP project life cycle, i.e. planning, implementation, stabilisation and improvement. The study shows that stakeholder involvement and their salience vary along the ERP project life cycle a...

  17. DECOVALEX II PROJECT. Technical report - Task 2A and 2B. (Revised edition)

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX 1, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 2A and 2B - the predictions and model calibration for the hydro-mechanical effect of the excavation of the test pit for the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan. Presented in this report are the descriptions of the project, definition of Task 2, and approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  18. Using Project-Based Learning and Google Docs to Support Diversity

    Science.gov (United States)

    Leh, Amy

    2014-01-01

    A graduate course, ETEC543 ("Technology and Learning I"), was revised to better serve increasing new student population, international students, in an academic program. Project-based learning, Google Docs, and instructional strategies fostering diversity and critical thinking were incorporated into the course redesign. Observations,…

  19. Integrating Relational Reasoning and Knowledge Revision during Reading

    Science.gov (United States)

    Kendeou, Panayiota; Butterfuss, Reese; Van Boekel, Martin; O'Brien, Edward J.

    2017-01-01

    Our goal in this theoretical contribution is to connect research on knowledge revision and relational reasoning. To achieve this goal, first, we review the "knowledge revision components framework" (KReC) that provides an account of knowledge revision processes, specifically as they unfold during reading of texts. Second, we review a…

  20. Different Moves, Similar Outcomes: A Comparison of Chinese and Swedish Preschool Teacher Education Programmes and the Revisions

    Science.gov (United States)

    Vong, Keang-ieng Peggy; Hu, Bi Ying; Xia, Yan-ping

    2015-01-01

    A Chinese and a Swedish preschool teacher education programme were examined in search for commonalities and differences of the curriculum decision-making considerations involved in the respective programme revision process. Findings include: (1) the two programmes have shifted orientations and become similar, yet there was no fundamental…

  1. Digital Problems and Strategies of Partial Revision in Overall Plan of Land Use

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The technical route of partial revision in overall plan of land use is briefly described.It is pointed out that problems of area measuring in the technical route are mainly due to the digital process.The digital problems of partial revision in overall plan of land use are presented as follows:the maps are not proofread before digitalization;the coordinate matching and projection transformation are not conducted on the maps;the information is asymmetrical pre and post the digitalization;the location lacks precision;the result maps are substandard.The causes of these problems are analyzed,which cover the following aspects.The lack of united management regulations;uneven working abilities of the staff in the compilation units;unawareness of the importance of map digilalization;poor basic conclitions of the original plan maps.At last,the relevant suggestions are put forward,for instance,releasing the national united management methods and technical criteria,establishing industrial admittance system and qualification system of complication units,setting up the mechanism of supervising digitalized results and controlling the quality,conducting coordinate matching and projection transformation and unifying the specification and mode of the results of maps so as to provide technical support for the overall plan of land use,play the micro-regulating role of land use and take a leading role in the sustainable development of social economy.

  2. The Impact of a Revised Curriculum on Academic Motivation, Burnout, and Quality of Life Among Medical Students.

    Science.gov (United States)

    Lyndon, Mataroria P; Henning, Marcus A; Alyami, Hussain; Krishna, Sanjeev; Yu, Tzu-Chieh; Hill, Andrew G

    2017-01-01

    The purpose of this study was to determine the impact of a revised curriculum on medical student academic motivation, burnout, and quality of life. This cross-sectional comparative study involved 2 medical school cohorts of second year and fourth year medical students at The University of Auckland: a cohort under a traditional curriculum (n = 437) and a cohort under a revised curriculum (n = 446). Participants completed self-reported questionnaires measuring academic motivation, burnout, and quality of life. Two multivariate analyses of covariance (MANCOVAs) were conducted. The response rate was 48%. No statistically significant differences were found between curriculum cohorts for mean scores of academic motivation, personal burnout, and quality of life. However, differences were found when comparing preclinical medical students and students in their clinical years of training. In comparison with Year 2 medical students, the MANCOVA for Year 4 students showed a significant main effect for the revised curriculum with respect to both physical and environmental quality of life. A revised medical curriculum had a differential effect on quality of life for Year 4 students in the latter years of medical school who are based in a clinical learning environment.

  3. Project GICC-Rhone revised final report - short version february 2005; Projet GICC-Rhone rapport final revise - version courte fevrier 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The GICC-Rhone project concerns the impacts on the french part of the Rhone basin, in the case of a climatic change which double the atmospheric CO{sub 2}. This situation is possible for the year 2050. The document precises the place of the project in the general scientifical context, the planning and the engaged teams, the experimental methodology, the used and developed simulation, a discussion on the data uncertainties and the obtained results. (A.L.B.)

  4. EPRI BWR Water Chemistry Guidelines Revision

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Giannelli, Joseph F.

    2014-01-01

    BWRVIP-190: BWR Water Chemistry Guidelines – 2008 Revision has been revised. The revision committee consisted of U.S. and non-U.S. utilities (members of the BWR Vessel and Internals Protection (BWRVIP) Mitigation Committee), reactor system manufacturers, fuel suppliers, and EPRI and industry experts. The revised document, BWRVIP-190 Revision 1, was completely reformatted into two volumes, with a simplified presentation of water chemistry control, diagnostic and good practice parameters in Volume 1 and the technical bases in Volume 2, to facilitate use. The revision was developed in parallel and in coordination with preparation of the Fuel Reliability Guidelines Revision 1: BWR Fuel Cladding Crud and Corrosion. Guidance is included for plants operating under normal water chemistry (NWC), moderate hydrogen water chemistry (HWC-M), and noble metal application (GE-Hitachi NobleChem™) plus hydrogen injection. Volume 1 includes significant changes to BWR feedwater and reactor water chemistry control parameters to provide increased assurance of intergranular stress corrosion cracking (IGSCC) mitigation of reactor materials and fuel reliability during all plant conditions, including cold shutdown (≤200°F (93°C)), startup/hot standby (>200°F (93°C) and ≤ 10%) and power operation (>10% power). Action Level values for chloride and sulfate have been tightened to minimize environmentally assisted cracking (EAC) of all wetted surfaces, including those not protected by hydrogen injection, with or without noble metals. Chemistry control guidance has been enhanced to minimize shutdown radiation fields by clarifying targets for depleted zinc oxide (DZO) injection while meeting requirements for fuel reliability. Improved tabular presentations of parameter values explicitly indicate levels at which actions are to be taken and required sampling frequencies. Volume 2 provides the technical bases for BWR water chemistry control for control of EAC, flow accelerated corrosion

  5. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  6. Parental Involvement and Academic Achievement

    Science.gov (United States)

    Goodwin, Sarah Christine

    2015-01-01

    This research study examined the correlation between student achievement and parent's perceptions of their involvement in their child's schooling. Parent participants completed the Parent Involvement Project Parent Questionnaire. Results slightly indicated parents of students with higher level of achievement perceived less demand or invitations…

  7. 18 CFR 380.4 - Projects or actions categorically excluded.

    Science.gov (United States)

    2010-04-01

    ... water power projects under Part I of the Federal Power Act, of “as built” or revised drawings or... facility (other than compression) solely within an existing building within a natural gas facility (other...) Wilderness areas; (iii) Wild and scenic rivers; (iv) Wetlands; (v) Units of the National Park System...

  8. Report on the second meeting of the project advisory committee (technical) for IAEA/WHO project EGY/6/004 (Egyptian Cancer Project) 3-9 April 1984, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.G.B.

    1984-07-01

    The purpose of the meeting was to review the first year's work and make recommendations for the future. The Committee dealt mainly with the Training Course, the selection of cases suitable for treatment by simple means, the revision of treatment notes and protocols, planning for the cytology (early diagnosis) programme, the collection and manipulation of data, the extension of the Project in Egypt, and its possible extension to other countries

  9. Raster-based derivation of a flood runoff susceptibility map using the revised runoff curve number (CN) for the Kuantan watershed, Malaysia

    DEFF Research Database (Denmark)

    Akbari, Abolghasem; Samah, Azizan Abu; Daryabor, Farshid

    2016-01-01

    This study aims to develop a methodology for generating a flood runoff susceptibility (FRS) map using a revised curve number (CN) method. The study area is in the Kuantan watershed (KW), Malaysia, which was seriously affected by floods in December 2013 and December 2014. A revised runoff CN map w......, the finding of this research provides a road map for government agencies to effectively implement flood mitigation projects in the study area.......This study aims to develop a methodology for generating a flood runoff susceptibility (FRS) map using a revised curve number (CN) method. The study area is in the Kuantan watershed (KW), Malaysia, which was seriously affected by floods in December 2013 and December 2014. A revised runoff CN map....... Approximately 5% of the study area was identified as a very high-risk zone and 13% as high-risk zone. However, the spatial extent of a high-risk zone in the downstream end and lowland areas of the KW could be considered to be the main cause of flood damage in recent years. From practical point of view...

  10. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  11. Revised Human Health Risk Assessment on Chlorpyrifos

    Science.gov (United States)

    We have revised our human health risk assessment and drinking water exposure assessment for chlorpyrifos that supported our October 2015 proposal to revoke all food residue tolerances for chlorpyrifos. Learn about the revised analysis.

  12. REVISION PERMISSIABILITY IN CIVIL PROCEDURE IN REPUBLIC OF MACEDONIA

    Directory of Open Access Journals (Sweden)

    Marina Gligorova

    2015-04-01

    Full Text Available The revision as an extraordinary legal remedy is one more legal instrument for litigant in the effort to achieve protection of the rights or to defend against ungrounded claims of the other party. Litigants may declare revision of the litigation process due to substantive violations of the provisions of Civil Procedure and incorrect application of substantive law. Declaring revision because of a substantive violation of the provisions of Civil Procedure is limited. The purpose of this research paper is to investigate the most common reasons for filing revision of the litigation process in the period from June 2011 to June in 2012. The research includes what kind of reasons are often repeated, and the volume, or the number of reviews submitted to the Supreme Court of the Republic of Macedonia. As general hypothesis is that most of the adopted revisions are due to substantial violations of the provisions of civil procedure. Two-thirds of the stated revisions in front of the Supreme Court of Republic of Macedonia were rejected as unfounded and only one third of the submitted revisions from June 2011 to June 2012 were grounded. Since accepted revisions 59% due to incorrect application of substantive law, and 41% due to substantial violations of the provisions of Civil Procedure.

  13. Test-Retest Reliability of the Parent Behavior Importance Questionnaire-Revised and the Parent Behavior Frequency Questionnaire-Revised

    Science.gov (United States)

    Mowder, Barbara A.; Shamah, Renee

    2011-01-01

    This study evaluated the test-retest reliability of two parenting measures: the Parent Behavior Importance Questionnaire-Revised (PBIQ-R) and Parent Behavior Frequency Questionnaire-Revised (PBFQ-R). These self-report parenting behavior assessment measures may be utilized as pre- and post-parent education program measures, with parents as well as…

  14. Involvement Without Participation?

    DEFF Research Database (Denmark)

    Olsén, Peter

    2012-01-01

    The article presents a case study of a knowledge-intensive company that launched a 2-year project to improve their psychosocial working environment. All parties agreed on the project, and the methods used aimed to promote the involvement of the employees. Surprisingly, the psychosocial working...... environment did not improve; on the contrary, it deteriorated. The article highlights cultural and structural obstacles to the process, including an inadequate understanding of organisational learning and a narrow focus on market and competition. The endeavours did not consistently increase delegation...

  15. Dual Headquarters Involvement in Subsidiary Innovation

    DEFF Research Database (Denmark)

    Dellestrand, Henrik; Kappen, Philip; Nell, Phillip Christopher

    2014-01-01

    The strategy and international business literature has identified the overall potential for headquarters to add value by allocating resources to subsidiary activities, but little is known about the extent to which multiple headquarters simultaneously involves itself in subsidiary operations....... The current paper takes on this neglected question by empirically investigating corporate and divisional headquarters direct involvement in innovation development projects at the subsidiary level. Analyses that draw upon 85 innovation development projects in 23 multinational enterprises reveal that dual...... of the developing subsidiary positively moderates the two aforementioned effects on dual headquarters involvement in innovation development. The results lend support for the notion that parenting in complex structures entails complex headquarters structures. Thus, the results question simplistic views...

  16. Maximum surgical blood ordering schedules for revision lower limb arthroplasty.

    Science.gov (United States)

    Mahadevan, Devendra; Challand, Christopher; Clarke, Andrew; Keenan, Jonathan

    2011-05-01

    Effective utilisation of blood products is fundamental. The introduction of maximum surgical blood ordering schedules (MSBOS) for operations has been shown to improve transfusion services. A retrospective analysis was undertaken to establish an evidence-based MSBOS for revision total hip replacement (THR) and total knee revision (TKR). The impact of this schedule on blood conservation was analysed. A retrospective analysis was undertaken on 397 patients who underwent revision THR and TKR over a 4-year period. The cross-match-to-transfusion ratio (CTR) and transfusion index (TI) were calculated. A MSBOS protocol was created based on the TIs and its' impact on transfusion services was assessed prospectively on 125 patients by comparing CTRs. In revision THR, TI was 1.19 for elective cases, 1.55 for emergency cases and 2.35 for infected cases. There was no difference in TI for revisions of cemented and uncemented components. Single component THR revision required less transfusion. In revision TKR, TI was 0.31 for elective cases, 2.0 for emergency cases and 1.23 for cases with infection. The introduction of the MSBOS protocol had resulted in a considerable improvement in blood ordering. Reductions in the CTR were seen for all types of revision surgery, but most evident in elective revision THR (3.24-2.18) and elective revision TKR (7.95-1.2). Analysis confirmed that excessive cross-matching occurred for revision lower limb arthroplasty. The introduction of our MSBOS protocol promoted blood conservation and compliance with established national guidelines.

  17. Risk factors for total hip arthroplasty aseptic revision.

    Science.gov (United States)

    Khatod, Monti; Cafri, Guy; Namba, Robert S; Inacio, Maria C S; Paxton, Elizabeth W

    2014-07-01

    The purpose of this study was to evaluate patient, operative, implant, surgeon, and hospital factors associated with aseptic revision after primary THA in patients registered in a large US Total Joint Replacement Registry. A total of 35,960 THAs registered from 4/2001-12/2010 were evaluated. The 8-year survival rate was 96.7% (95% CI 96.4%-97.0%). Females had a higher risk of aseptic revision than males. Hispanic and Asian patients had a lower risk of revision than white patients. Ceramic-on-ceramic, ceramic-on-conventional polyethylene, and metal-on-conventional polyethylene bearing surfaces had a higher risk of revision than metal-on-highly cross-linked polyethylene. Body mass index, health status, diabetes, diagnosis, fixation, approach, bilateral procedures, head size, surgeon fellowship training, surgeon and hospital volume were not revision risk factors. Copyright © 2014 Elsevier Inc. All rights reserved.

  18. The longevity risk of the Dutch Actuarial Association’s projection model

    NARCIS (Netherlands)

    F. Peters (Frederick); W.J. Nusselder (Wilma); J.P. Mackenbach (Johan)

    2012-01-01

    markdownabstractAccurate assessment of the risk that arises from further increases in life expectancy is crucial for the financial sector, in particular for pension funds and life insurance companies. The Dutch Actuarial Association presented a revised projection model in 2010, while in the same

  19. Students as agents – connecting faculty with industry and creating collaborative projects

    DEFF Research Database (Denmark)

    Jensen, Lotte Bjerregaard

    2015-01-01

    Collaborative projects between partners in the building industry and students constitute important means for addressing more advanced parts of the CDIO Syllabus 4. In this paper an existing internship program is revised in order to enhance collaboration between industry and faculty...

  20. Involving women.

    Science.gov (United States)

    Agbo, J

    1994-01-01

    I am a primary health care (PHC) coordinator working with the May Day Rural project, a local NGO involved in integrated approaches and programs with rural communities in the Ga District of the Greater-Accra region in Ghana. When we talk about the community development approach we must first and foremost recognize that we are talking about women, because in the developing world frequent childbirths mean that her burden of mortality is higher than a man's; her workload is extremely heavy--whether in gardening, farming, other household duties, caring for the sick, or the rearing of children; she has a key role in PHC and community development, because men are always looking for greener pastures elsewhere, leaving the women behind. Women's concerns are critical in most health care projects and women and children are their main beneficiaries. Why not include women in the management team, project design, implementation and evaluation processes? That is what the May Day Rural project is practicing, encouraging women's participation and creating a relationship of trust. full text

  1. Revision of infected knee arthroplasties in Denmark

    DEFF Research Database (Denmark)

    Lindberg-Larsen, Martin; Jørgensen, Christoffer C; Bagger, Jens

    2016-01-01

    Background and purpose - The surgical treatment of periprosthetic knee infection is generally either a partial revision procedure (open debridement and exchange of the tibial insert) or a 2-stage exchange arthroplasty procedure. We describe the failure rates of these procedures on a nationwide...... basis. Patients and methods - 105 partial revisions (100 patients) and 215 potential 2-stage revision procedures (205 patients) performed due to infection from July 1, 2011 to June 30, 2013 were identified from the Danish Knee Arthroplasty Register (DKR). Failure was defined as surgically related death...

  2. 75 FR 60485 - NRC Enforcement Policy Revision

    Science.gov (United States)

    2010-09-30

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0497] NRC Enforcement Policy Revision AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement. SUMMARY: The Nuclear Regulatory Commission (NRC or Commission) is publishing a major revision to its Enforcement Policy (Enforcement Policy or Policy) to...

  3. [Revised practice guideline 'Anaemia in midwifery practice'

    NARCIS (Netherlands)

    Beentjes, M.; Jans, S.M.P.J.

    2012-01-01

    The practice guideline of the Royal Dutch Organization of Midwives 'Anaemia in primary care midwifery practice' published in 2000, has recently been revised. The revised guideline takes physiological haemodilution during pregnancy into consideration and provides gestation specific reference values

  4. 77 FR 14272 - Review and Approval of Projects

    Science.gov (United States)

    2012-03-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...

  5. Analysis of NRC Regulatory Guide 1.21 Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il; Yook, Dae Sik; Lee, Byung Soo [KINS, Daejeon (Korea, Republic of)

    2015-05-15

    It is essential to have a degree of uniformity in the methods used for measuring, evaluating, recording, and reporting data on radioactive material in effluents and solid wastes. For this purpose, the U.S. Nuclear Regulatory Commission (NRC) released a revised version of the Regulatory Guide 1.21 'Measuring, evaluating, and reporting radioactive material in liquid and gaseous effluents and solid waste' (revision 2) in 2009, updating the revision 1 version released in 1974. This study compares the previous revision 1 (1974) version with the revision 2 (2009) version to elaborate on the application of the guidelines to Korea. This study consists of an analysis of the 2009 Revision 2 version of the U.S. NRC Regulatory Guidelines 1.21 and an exposition of methods for its application in the domestic environment. Major revisions were made to allow for the adoption of a risk informed approach. Radionuclides with lower than 1% contribution to emission or radiation levels can be selected as principal radionuclides. Requirements for analysis of leaks and spills have been reinforced, with additional groundwater monitoring and hydrological data analysis becoming necessary.

  6. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [Karinta-Konsult, Taeby (Sweden); Chataignier, Stephane [Electricite de France (France); Drottz-Sjoeberg, Britt-Marie [BMD Research (Sweden)] [and others

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  7. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    International Nuclear Information System (INIS)

    Andersson, Kjell; Chataignier, Stephane; Drottz-Sjoeberg, Britt-Marie

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  8. Belief Revision in the GOAL Agent Programming Language

    DEFF Research Database (Denmark)

    Spurkeland, Johannes Svante; Jensen, Andreas Schmidt; Villadsen, Jørgen

    2013-01-01

    Agents in a multiagent system may in many cases find themselves in situations where inconsistencies arise. In order to properly deal with these, a good belief revision procedure is required. This paper illustrates the usefulness of such a procedure: a certain belief revision algorithm is consider...... in order to deal with inconsistencies and, particularly, the issue of inconsistencies, and belief revision is examined in relation to the GOAL agent programming language....

  9. Safety basis for selected activities in single-shell tanks with flammable gas concerns. Revision 1

    International Nuclear Information System (INIS)

    Schlosser, R.L.

    1996-01-01

    This is full revision to Revision 0 of this report. The purpose of this report is to provide a summary of analyses done to support activities performed for single-shell tanks. These activities are encompassed by the flammable gas Unreviewed Safety Question (USQ). The basic controls required to perform these activities involve the identification, elimination and/or control of ignition sources and monitoring for flammable gases. Controls are implemented through the Interim Safety Basis (ISB), IOSRs, and OSDs. Since this report only provides a historical compendium of issues and activities, it is not to be used as a basis to perform USQ screenings and evaluations. Furthermore, these analyses and others in process will be used as the basis for developing the Flammable Gas Topical Report for the ISB Upgrade

  10. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  11. The Impact of a Revised Curriculum on Academic Motivation, Burnout, and Quality of Life Among Medical Students

    Directory of Open Access Journals (Sweden)

    Mataroria P Lyndon

    2017-07-01

    Full Text Available Objective: The purpose of this study was to determine the impact of a revised curriculum on medical student academic motivation, burnout, and quality of life. Methods: This cross-sectional comparative study involved 2 medical school cohorts of second year and fourth year medical students at The University of Auckland: a cohort under a traditional curriculum (n = 437 and a cohort under a revised curriculum (n = 446. Participants completed self-reported questionnaires measuring academic motivation, burnout, and quality of life. Two multivariate analyses of covariance (MANCOVAs were conducted. Results: The response rate was 48%. No statistically significant differences were found between curriculum cohorts for mean scores of academic motivation, personal burnout, and quality of life. However, differences were found when comparing preclinical medical students and students in their clinical years of training. In comparison with Year 2 medical students, the MANCOVA for Year 4 students showed a significant main effect for the revised curriculum with respect to both physical and environmental quality of life. Conclusions: A revised medical curriculum had a differential effect on quality of life for Year 4 students in the latter years of medical school who are based in a clinical learning environment.

  12. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G.J. [Dept. of Energy, Washington, DC (United States); Williams, R.E.; Kudera, D.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Bailey, D.E. [NJG, Inc. (United States)

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  13. Parent Involvement in Education Project (PIEP): Annual Report.

    Science.gov (United States)

    Southwest Educational Development Lab., Austin, TX.

    This survey is the fifth in a series conducted to gather information about attitudinal barriers to parent involvement and to examine their implications for teacher training. In six states (Arkansas, Louisiana, Mississippi, New Mexico, Oklahoma, and Texas), school superintendents, school board presidents, and state agency officials were asked about…

  14. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  15. The Use of Personal Projects Analysis to Enhance Occupational Therapy Goal Identification

    Directory of Open Access Journals (Sweden)

    Mary Egan

    2016-01-01

    Full Text Available Background: Client-centered occupational therapy begins with the identification of personally-relevant patient goals. This study aimed to determine whether the elicitation module of Personal Projects Analysis (PPA could help patients in an acquired brain injury day hospital program identify more meaningful goals than those identified using the Canadian Occupational Performance Measure (COPM alone. Method: Ten patients completed the COPM. They rated the importance of each goal and their confidence that they could attain each goal. During the next session, using the elicitation module of PPA, they identified personal projects just prior to their brain injuries, current personal projects, and future desired personal projects. They were then invited to revise their COPM goals and re-rate them for importance and confidence. Results: Following completion of the elicitation module of PPA, seven participants changed at least one goal. Of the goals that were changed, half were revised to include the mention of another person. There were no significant changes in average goal importance or perceived attainability. Occupational therapists reported that the elicitation module of PPA helped them get to know their patients better and identify potential therapeutic occupations. Discussion: The elicitation module of PPA may help people develop goals that are more embedded in their social contexts.

  16. Human-system interface design review guideline -- Review software and user's guide: Final report. Revision 1, Volume 3

    International Nuclear Information System (INIS)

    1996-06-01

    NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant's HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 3 contains an interactive software application of the NUREG-0700, Revision 1 guidance and a user's guide for this software. The software supports reviewers during review preparation, evaluation design using the human factors engineering guidelines, and in report preparation. The user's guide provides system requirements and installation instructions, detailed explanations of the software's functions and features, and a tutorial on using the software

  17. Involving stakeholders in the commissioning and implementation of fishery science projects: experiences from the U.K. Fisheries Science Partnership.

    Science.gov (United States)

    Armstrong, M J; Payne, A I L; Deas, B; Catchpole, T L

    2013-10-01

    Following from similar initiatives worldwide, the U.K.'s Fisheries Science Partnership (FSP) was established in 2003 to provide the fishing industry with opportunities to propose and participate in scientific studies in collaboration with fishery scientists. Key concepts were that most of the available funding would support industry participation, that industry, not scientists, would come up with the ideas for projects, and that commercial fishing vessels and fishing methods would be used to address specific concerns of the fishing industry in a scientifically controlled manner. Nearly 100 projects had been commissioned by March 2012, covering annual time-series surveys of stocks subject to traditional assessment, and ad hoc projects on, e.g. gear selectivity, discard survival, tagging and migration and fishery development. The extent to which the results of the projects have been used by stakeholders, fishery scientists and fishery managers at a national and E.U. level is evaluated, along with the degree of industry interest and involvement, and reasons are identified for successes or failures in the uptake of the results into management and policy. Finally, the question is posed whether the programme has been successful in improving the engagement of the fishing community in the science-management process and in fostering communication and greater trust between fishers, scientists and managers. © 2013 Crown Copyright. © 2013 The Fisheries Society of the British Isles.

  18. Explanatory Coherence and Belief Revision in Naive Physics

    Science.gov (United States)

    1988-07-01

    continental drift (Thagard & Nowak, 1988), and debates about why the dinosaurs became extinct . Application of ECHO to the belief revisions in Pat and Hal...rewono of nocuamy Idid 4onoly by bodck number) Students of reasoning have long tried to understand how people revise systems of beliefs. We maintain...Princeton University Students of reasoning have long tried to understand how people revise systems of beliefs (see Wertheimer, 1945, for example). We will

  19. Results of revision anterior shoulder stabilization surgery in adolescent athletes.

    Science.gov (United States)

    Blackman, Andrew J; Krych, Aaron J; Kuzma, Scott A; Chow, Roxanne M; Camp, Christopher; Dahm, Diane L

    2014-11-01

    The purpose of this study was to determine failure rates, functional outcomes, and risk factors for failure after revision anterior shoulder stabilization surgery in high-risk adolescent athletes. Adolescent athletes who underwent primary anterior shoulder stabilization were reviewed. Patients undergoing subsequent revision stabilization surgery were identified and analyzed. Failure rates after revision surgery were assessed by Kaplan-Meier analysis. Failure was defined as recurrent instability requiring reoperation. Functional outcomes included the Marx activity score; American Shoulder and Elbow Surgeons score; and University of California, Los Angeles score. The characteristics of patients who required reoperation for recurrent instability after revision surgery were compared with those of patients who required only a single revision to identify potential risk factors for failure. Of 90 patients who underwent primary anterior stabilization surgery, 15 (17%) had failure and underwent revision surgery (mean age, 16.6 years; age range, 14 to 18 years). The mean follow-up period was 5.5 years (range, 2 to 12 years). Of the 15 revision patients, 5 (33%) had recurrent dislocations and required repeat revision stabilization surgery at a mean of 50 months (range, 22 to 102 months) after initial revision. No risk factors for failure were identified. The Kaplan-Meier reoperation-free estimates were 86% (95% confidence interval, 67% to 100%) at 24 months and 78% (95% confidence interval, 56% to 100%) at 48 months after revision surgery. The mean final Marx activity score was 14.8 (range, 5 to 20); American Shoulder and Elbow Surgeons score, 82.1 (range, 33 to 100); and University of California, Los Angeles score, 30.8 (range, 16 to 35). At 5.5 years' follow-up, adolescent athletes had a high failure rate of revision stabilization surgery and modest functional outcomes. We were unable to convincingly identify specific risk factors for failure of revision surgery. Level IV

  20. Plan-Belief Revision in Jason

    DEFF Research Database (Denmark)

    Jensen, Andreas Schmidt; Villadsen, Jørgen

    2015-01-01

    When information is shared between agents of unknown reliability, it is possible that their belief bases become inconsistent. In such cases, the belief base must be revised to restore consistency, so that the agent is able to reason. In some cases the inconsistent information may be due to use of...... of incorrect plans. We extend work by Alechina et al. to revise belief bases in which plans can be dynamically added and removed. We present an implementation of the algorithm in the AgentSpeak implementation Jason....

  1. Revised Huang-Yang multipolar pseudopotential

    International Nuclear Information System (INIS)

    Derevianko, Andrei

    2005-01-01

    A number of authors have recently pointed out inconsistencies of results obtained with the Huang-Yang multipolar pseudopotential for low-energy scattering [K. Huang and K. C. Yang, Phys. Rev. 105, 767 (1957); later revised by Huang, Statistical Mechanics (Wiley, New York, 1963)]. The conceptual validity of their original derivation has been questioned. Here I show that these inconsistencies are rather due to an algebraic mistake made by Huang and Yang. With the corrected error, I present the revised version of the multipolar pseudopotential

  2. Factors contributing to the waste generation in building projects of Pakistan

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.

    2016-01-01

    Generation of construction waste is a worldwide issue that concerns not only governments but also the building actors involved in construction industry. For developing countries like Pakistan, rising levels of waste generation, due to the rapid growth of towns and cities have become critical issue. Therefore this study is aimed to detect the factors, which are the main causes of construction waste generation. Questionnaire survey has been conducted to achieve this task and RIW (Relative Importance Weight) method has been used to analyze the results of this study. The important factors contributing to the generation of construction as identified in this study are: frequent changes/ revision in design during construction process; poor scheduling; unavailability of storage; poor workmanship; poor layout; inefficient planning and scheduling of resources and lack of coordination among supervision staff deployed at site. Based on the identified factors, the study also has presented some suggestions for the reduction of construction waste in building construction projects of Pakistan. (author)

  3. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation, Revision 4, Volume IV: Inherent Optical Properties: Instruments, Characterizations, Field Measurements and Data Analysis Protocols

    Science.gov (United States)

    Mueller, J. L.; Fargion, G. S.; McClain, C. R. (Editor); Pegau, S.; Zanefeld, J. R. V.; Mitchell, B. G.; Kahru, M.; Wieland, J.; Stramska, M.

    2003-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the Sensor Intercomparision and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities and algorithm development. The document is organized into 6 separate volumes as Ocean Optics Protocols for Satellite Ocean Color Sensor Validation, Revision 4. Volume I: Introduction, Background, and Conventions; Volume II: Instrument Specifications, Characterization and Calibration; Volume III: Radiometric Measurements and Data Analysis Methods; Volume IV: Inherent Optical Properties: Instruments, Characterization, Field Measurements and Data Analysis Protocols; Volume V: Biogeochemical and Bio-Optical Measurements and Data Analysis Methods; Volume VI: Special Topics in Ocean Optics Protocols and Appendices. The earlier version of Ocean Optics Protocols for Satellite Ocean Color Sensor Validation, Revision 3 is entirely superseded by the six volumes of Revision 4 listed above.

  4. Problems and risks involved in the projected storage of radioactive waste in a salt dome in the northwest of the FRG

    International Nuclear Information System (INIS)

    Mauthe, F.

    1979-01-01

    Current planning envisages long-term intermediate storage of radioactive waste and the exploration of the Gorleben salt dome by deep drilling in order to start appropriate mining work in case of favourable drilling results. The statements presented here on the problem of the 'Feasibility of ultimate storage of radioactive waste in salt deposits' (subject selected by the Government of the land Lower-Saxony) are aimed at informing the general public about the difficulties and problems involved in this waste disposal project and critically assess the arguments put forward by industry and licensing authorities in order to gain acceptance for this politically delicate project; the argumentation discussed here mainly refers to the field of geological science. (orig.) [de

  5. Revised spatially distributed global livestock emissions

    Science.gov (United States)

    Asrar, G.; Wolf, J.; West, T. O.

    2015-12-01

    Livestock play an important role in agricultural carbon cycling through consumption of biomass and emissions of methane. Quantification and spatial distribution of methane and carbon dioxide produced by livestock is needed to develop bottom-up estimates for carbon monitoring. These estimates serve as stand-alone international emissions estimates, as input to global emissions modeling, and as comparisons or constraints to flux estimates from atmospheric inversion models. Recent results for the US suggest that the 2006 IPCC default coefficients may underestimate livestock methane emissions. In this project, revised coefficients were calculated for cattle and swine in all global regions, based on reported changes in body mass, quality and quantity of feed, milk production, and management of living animals and manure for these regions. New estimates of livestock methane and carbon dioxide emissions were calculated using the revised coefficients and global livestock population data. Spatial distribution of population data and associated fluxes was conducted using the MODIS Land Cover Type 5, version 5.1 (i.e. MCD12Q1 data product), and a previously published downscaling algorithm for reconciling inventory and satellite-based land cover data at 0.05 degree resolution. Preliminary results for 2013 indicate greater emissions than those calculated using the IPCC 2006 coefficients. Global total enteric fermentation methane increased by 6%, while manure management methane increased by 38%, with variation among species and regions resulting in improved spatial distributions of livestock emissions. These new estimates of total livestock methane are comparable to other recently reported studies for the entire US and the State of California. These new regional/global estimates will improve the ability to reconcile top-down and bottom-up estimates of methane production as well as provide updated global estimates for use in development and evaluation of Earth system models.

  6. Trends in Revision Elbow Ulnar Collateral Ligament Reconstruction in Professional Baseball Pitchers.

    Science.gov (United States)

    Wilson, Alexander T; Pidgeon, Tyler S; Morrell, Nathan T; DaSilva, Manuel F

    2015-11-01

    To determine the frequency of revision elbow ulnar collateral ligament (UCL) reconstruction in professional baseball pitchers. Data were collected on 271 professional baseball pitchers who underwent primary UCL reconstruction. Each player was evaluated retrospectively for occurrence of revision UCL reconstructive surgery to treat failed primary reconstruction. Data on players who underwent revision UCL reconstruction were compiled to determine total surgical revision incidence and revision rate by year. The incidence of early revision was analyzed for trends. Average career length after primary UCL reconstruction was calculated and compared with that of players who underwent revision surgery. Logistic regression analysis was performed to assess risk factors for revision including handedness, pitching role, and age at the time of primary reconstruction. Between 1974 and 2014, the annual incidence of primary UCL reconstructions among professional pitchers increased, while the proportion of cases being revised per year decreased. Of the 271 pitchers included in the study, 40 (15%) required at least 1 revision procedure during their playing career. Three cases required a second UCL revision reconstruction. The average time from primary surgery to revision was 5.2 ± 3.2 years (range, 1-13 years). The average length of career following primary reconstruction for all players was 4.9 ± 4.3 years (range, 0-22 years). The average length of career following revision UCL reconstruction was 2.5 ± 2.4 years (range, 0-8 years). No risk factors for needing revision UCL reconstruction were identified. The incidence of primary UCL reconstructions among professional pitchers is increasing; however, the rate of primary reconstructions requiring revision is decreasing. Explanations for the decreased revision rate may include improved surgical technique and improved rehabilitation protocols. Therapeutic IV. Copyright © 2015 American Society for Surgery of the Hand. Published by

  7. Revision and psychometric testing of the City of Hope Quality of Life-Ostomy Questionnaire.

    Science.gov (United States)

    Grant, Marcia; Ferrell, Betty; Dean, Grace; Uman, Gwen; Chu, David; Krouse, Robert

    2004-10-01

    Ostomies may be performed for bowel or urinary diversion, and occur in both cancer and non-cancer patients. Impact on physical, psychological, social and spiritual well-being is not unexpected, but has been minimally described in the literature. The City of Hope Quality of Life (COH-QOL)-Ostomy Questionnaire is an adult patient self-report instrument designed to assess quality of life. This report focuses on the revision and psychometric testing of this questionnaire. The revised COH-QOL-Ostomy Questionnaire involved in-depth patient interviews and expert panel review. The format consisted of a 13-item disease and demographic section, a 34-item forced-choice section, and a 41-item linear analogue scaled section. A mailed survey to California members of the United Ostomy Association resulted in a 62% response rate (n = 1513). Factor analysis was conducted to refine the instrument. Construct validity involved testing a number of hypotheses identifying contrasting groups. Factor analysis confirmed the conceptual framework. Reliability of subscales ranged from 0.77 to 0.90. The questionnaire discriminated between subpopulations with specific concerns. Overall, the analyses provide evidence for the validity and reliability of the COH-QOL-Ostomy Questionnaire as a comprehensive, multidimensional self-report questionnaire for measuring quality of life in patients with intestinal ostomies.

  8. The nuclear liability conventions revised

    International Nuclear Information System (INIS)

    Reyners, P.

    2004-01-01

    The signature on 12 February 2004 of the Protocols amending respectively the 1960 Paris Convention and the 1963 Brussels Supplementary Convention was the second step of the process of modernisation of the international nuclear liability regime after the adoption in September 1997 of a Protocol revising the 1963 Vienna Convention and of a new Convention on Supplementary Compensation for Nuclear Damage. The common objective of the new instruments is to provide more funds to compensate a larger number of potential victims in respect of a broader range of damage. Another goal of the revision exercise was to maintain the compatibility between the Paris and Vienna based systems, a commitment enshrined in the 1988 Joint Protocol, as well as to ascertain that Paris/Brussels countries could also become a Party to the Convention on Supplementary Compensation. However, while generally consistent vis a vis the Joint Protocol, the provisions of the Paris and Vienna Conventions, as revised, differ on some significant aspects. Another remaining issue is whether the improved international nuclear liability regime will succeed in attracting in the future a larger number of countries, particularly outside Europe, and will so become truly universal. Therefore, the need for international co-operation to address these issues, to facilitate the adoption of new implementing legislation and to ensure that this special regime keeps abreast of economic and technological developments, is in no way diminished after the revision of the Conventions.(author)

  9. Involving users in the development of embedded technology in construction

    DEFF Research Database (Denmark)

    Storgaard, Kresten; Buch-Hansen, Thomas Cornelius; Ærenlund, Lærke

    2011-01-01

    Based on a project about user driven innovation and embedded technology in construction (BIIB), the paper discusses methodological issues on user involvement. In the paper especially focus is on the experiences on involving users in collaborative development of scenarios, in the validation...... of scenarios and in developing innovative solutions on a conceptual level. The project discusses 1) concepts of users and 2) methods for collaborative involvement. The first discussion involves presentation of an extended user concept and a discussion of differences between lead users and need-advanced users....... The second discussion on collaborative involvement, discuss experiences with methods for communication across cultural and professional competences with reference to boundary objects, tangible systems and visualization. In the project four segments of situations for use of embedded technology in construction...

  10. Participatory action research: involving students in parent education.

    Science.gov (United States)

    Fowler, Cathrine; Wu, Cynthia; Lam, Winsome

    2014-01-01

    Competition for scarce clinical placements has increased requiring new and innovative models to be developed to meet the growing need. A participatory action research project was used to provide a community nursing clinical experience of involvement in parent education. Nine Hong Kong nursing students self-selected to participate in the project to implement a parenting program called Parenting Young Children in a Digital World. Three project cycles were used: needs identification, skills development and program implementation. Students were fully involved in each cycle's planning, action and reflection phase. Qualitative and quantitative data were collected to inform the project. The overall outcome of the project was the provision of a rich and viable clinical placement experience that created significant learning opportunities for the students and researchers. This paper will explore the student's participation in this PAR project as an innovative clinical practice opportunity. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Sequenced Peer Revision: Creating Competence and Community

    Science.gov (United States)

    Bowman, Ingrid K.; Robertson, John

    2013-01-01

    Mastering techniques of self- and peer revision is a valuable tool for all writers, especially US-educated Generation 1.5 students, whose near fluency enables them to dialogue successfully about their writing. Using action research, 2 academic writing instructors systematically trained students to more responsibly and effectively revise their…

  12. Quantum interaction. Revised selected papers

    International Nuclear Information System (INIS)

    Song, Dawei; Zhang, Peng; Wang, Lei; Arafat, Sachi

    2011-01-01

    This book constitutes the thoroughly refereed post-conference proceedings of the 5th International Symposium on Quantum Interaction, QI 2011, held in Aberdeen, UK, in June 2011. The 26 revised full papers and 6 revised poster papers, presented together with 1 tutorial and 1 invited talk were carefully reviewed and selected from numerous submissions during two rounds of reviewing and improvement. The papers show the cross-disciplinary nature of quantum interaction covering topics such as computation, cognition, mechanics, social interaction, semantic space and information representation and retrieval. (orig.)

  13. Fast-track revision knee arthroplasty

    DEFF Research Database (Denmark)

    Husted, Henrik; Otte, Niels Kristian Stahl; Kristensen, Billy B

    2011-01-01

    Abstract Background and purpose Fast-track surgery has reduced the length of hospital stay (LOS), morbidity, and convalescence in primary hip and knee arthroplasty (TKA). We assessed whether patients undergoing revision TKA for non-septic indications might also benefit from fast-track surgery....... Methods 29 patients were operated with 30 revision arthroplasties. Median age was 67 (34-84) years. All patients followed a standardized fast-track set-up designed for primary TKA. We determined the outcome regarding LOS, morbidity, mortality, and satisfaction. Results Median LOS was 2 (1-4) days...

  14. Quantum interaction. Revised selected papers

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dawei; Zhang, Peng; Wang, Lei [Aberdeen Univ. (United Kingdom). School of Computing; Melucci, Massimo [Padua Univ., Padova (Italy). Dept. of Information Engineering; Frommholz, Ingo [Bedfordshire Univ. (United Kingdom); Arafat, Sachi (eds.) [Glasgow Univ. (United Kingdom). School of Computing Science

    2011-07-01

    This book constitutes the thoroughly refereed post-conference proceedings of the 5th International Symposium on Quantum Interaction, QI 2011, held in Aberdeen, UK, in June 2011. The 26 revised full papers and 6 revised poster papers, presented together with 1 tutorial and 1 invited talk were carefully reviewed and selected from numerous submissions during two rounds of reviewing and improvement. The papers show the cross-disciplinary nature of quantum interaction covering topics such as computation, cognition, mechanics, social interaction, semantic space and information representation and retrieval. (orig.)

  15. Medical writing, revising and editing

    DEFF Research Database (Denmark)

    Pilegaard, Morten

    2006-01-01

    The globalization of science makes medical writing, editing and revision a rapidly growing field of linguistic study and practice. Medical science texts are written according to uniform, general guidelines and medical genres have become highly conventionalized in terms of structure and linguistic...... form. Medical editing often takes the form of peer review and mainly addresses issues of contents and overall validity. Medical revision incorporates the checking of the macrostructure and the microstructure of the text, its language and style and its suitability for the target reader or client...

  16. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    International Nuclear Information System (INIS)

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  17. A Survey of Industrial Involvement in Open Source

    OpenAIRE

    Røsdal, Andreas

    2006-01-01

    This thesis presents the results of an explorative survey of industrial involvement in open source. The survey is performed in collaboration with participants from the European ITEA project, COSI (Co-development using inner & Open source in Software Intensive products). The survey was performed to explore aspects of industrial involvement in open source, as industrial management of open source project, industrial use of open source components, related development, and communication processes,...

  18. Microbiological diagnosis in revision of infected knee arthroplasties in Denmark

    DEFF Research Database (Denmark)

    Lindberg-Larsen, Martin; Pitter, Frederik Taylor; Voldstedlund, Marianne

    2017-01-01

    . METHODS: One hundred and two partial revisions (open debridement and exchange of tibial insert) and 213 two-stage procedures performed due to infection in 275 patients from 1 July 2011 to 30 June 2013 were included and analysed by linkage to data from a nationwide registry on microbiological test results....... RESULTS: 78 (24.8%) revisions were culture negative, 192 (60.9%) showed monomicrobial growth and 43 (14.3%) polymicrobial growth. Staphylococcus aureus was the most frequent isolate in mono-culture in 70 (22.2%) revisions and in polymicrobial culture in 15 revisions with a total frequency of 27.0%. Only...... one case (1.4%) of methicillin-resistance was registered. Coagulase-negative staphylococci (CoNS) were frequent, sole pathogen in 65 revisions and in polymicrobial cultures in 28 revisions with a total frequency of 29.5%. A pre-operative knee aspiration was performed in 50% and preoperative blood...

  19. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  20. 30 CFR 285.617 - What activities require a revision to my SAP, and when will MMS approve the revision?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What activities require a revision to my SAP, and when will MMS approve the revision? 285.617 Section 285.617 Mineral Resources MINERALS MANAGEMENT...: (1) Designed not to cause undue harm or damage to natural resources; life (including human and...

  1. Particulate Air Contamination in Puerto Rico: A Student Involvement Project.

    Science.gov (United States)

    Eckert, Richard R.

    1979-01-01

    Describes a research project undertaken by physics undergraduate students to monitor particulate air contamination in Ponce, Puerto Rico, and to determine the meteorological factors which contribute to it. (GA)

  2. Test Standard Revision Update: JESD57, "Procedures for the Measurement of Single-Event Effects in Semiconductor Devices from Heavy-Ion Irradiation"

    Science.gov (United States)

    Lauenstein, Jean-Marie

    2015-01-01

    The JEDEC JESD57 test standard, Procedures for the Measurement of Single-Event Effects in Semiconductor Devices from Heavy-Ion Irradiation, is undergoing its first revision since 1996. In this talk, we place this test standard into context with other relevant radiation test standards to show its importance for single-event effect radiation testing for space applications. We show the range of industry, government, and end-user party involvement in the revision. Finally, we highlight some of the key changes being made and discuss the trade-space in which setting standards must be made to be both useful and broadly adopted.

  3. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  4. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  5. Mathematics Curriculum in Ireland: The Influence of PISA on the Development of Project Maths

    Directory of Open Access Journals (Sweden)

    Liz KIRWAN

    2015-12-01

    Full Text Available This article interrogates the extent to which the Organization for Economic Cooperation and Development (OECD through its Programme for International Student Assessment (PISA influenced the development of Project Maths, a new second-level mathematics education policy in Ireland. It argues that the Irish government, in its revision of mathematics education policy, was strongly influenced by PISA and that concern with the country’s ‘average’ placement in the international assessment was instrumental in defining the direction of the revision. It traces the genetic imprint of PISA on the development of curriculum policy, the new mathematics syllabus, its content and assessment. It argues that Project Maths sets out to follow closely the PISA conceptual framework. However, the analysis finds that Project Maths is not a mini-PISA but that the programme is comprised of two distinct approaches, on the one hand retaining the abstract, symbolic mathematics of sections of the pre-existing curriculum, while on the other emphasizing a PISA-like approach to pedagogy and to real-life problem solving.

  6. Engineering drawing field verification program. Revision 3

    International Nuclear Information System (INIS)

    Ulk, P.F.

    1994-01-01

    Safe, efficient operation of waste tank farm facilities is dependent in part upon the availability of accurate, up-to-date plant drawings. Accurate plant drawings are also required in support of facility upgrades and future engineering remediation projects. This supporting document establishes the procedure for performing a visual field verification of engineering drawings, the degree of visual observation being performed and documenting the results. A copy of the drawing attesting to the degree of visual observation will be paginated into the released Engineering Change Notice (ECN) documenting the field verification for future retrieval and reference. All waste tank farm essential and support drawings within the scope of this program will be converted from manual to computer aided drafting (CAD) drawings. A permanent reference to the field verification status will be placed along the right border of the CAD-converted drawing, referencing the revision level, at which the visual verification was performed and documented

  7. NV/YMP radiological control manual, Revision 2

    International Nuclear Information System (INIS)

    Gile, A.L.

    1996-11-01

    The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations

  8. NV/YMP radiological control manual, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Gile, A.L. [comp.

    1996-11-01

    The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations.

  9. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  10. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    International Nuclear Information System (INIS)

    Hall, L.R.

    1995-01-01

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1

  11. Study of Faculty Viewpoints on Challenges and Factors Influencing Curriculum Development/Revision

    Directory of Open Access Journals (Sweden)

    Deepa Bhat

    2017-10-01

    Full Text Available Introduction: Curriculum Development (CD is an on-going process and not just a product. It must be responsive to changing values and expectations in education if it has to remain useful. Aim: To investigate the perspectives of educators on challenges and factors affecting the curriculum development/revision in health profession education courses. Materials and Methods: Mixed method approach was used for data collection. The faculties involved in curriculum development/revision were administered structured validated questionnaire (n=8, in depth interviews (n=3 and focus group discussion (n=3. Rigor was ensured through triangulation of data. The questionnaire data was analysed using descriptive statistics. Results: Faculties opined that 87.5% of courses are running successfully, 75% developed curriculum as team, 50% expressed that all stake holders were involved and 75% CD process did not turn out to be an organised approach. Needs assessment was not done in every course and some faculties did not have prior experience in CD. Time allotted was just sufficient and planning was fair. The allocation of finance and resources were just adequate. Team work and cooperation followed by qualified expert panel were the leading facilitating factors whereas lack of awareness on steps involved in CD and infrastructure were the significant hindering contributors. About 87.5% expressed their concern that addition of new courses affected their basic course they had to teach. Global requirements were not taken into account in several courses but reasonable number of courses was adequately monitored. Conclusion: Formal training of faculty in CD must be made mandatory in any health profession education. Understanding the facilitating and hindering factors with systematic monitoring of each step would impact the outcome of a program.

  12. Pain and Function Following Revision Cubital Tunnel Surgery.

    Science.gov (United States)

    Davidge, Kristen M; Ebersole, Gregory C; Mackinnon, Susan E

    2017-11-01

    The purpose of this study was to determine pain and functional outcomes following revision cubital tunnel surgery and to identify predictors of poor postoperative outcome. A retrospective cohort study was conducted of all patients undergoing revision cubital tunnel surgery over a 5-year period at a high-volume peripheral nerve center. Intraoperative findings, demographic and injury factors, and outcomes were reviewed. Average pain, worst pain, and impact of pain on self-perceived quality of life were each measured using a 10-cm visual analog scale (VAS). Function was evaluated using pinch and grip strength, as well as the Disabilities of the Arm, Shoulder and Hand (DASH) questionnaire. Differences in preoperative and postoperative pain, strength, and DASH were analyzed using nonparametric tests. Predictors of postoperative average pain were evaluated using odds ratios and linear regression analyses. The final cohort consisted of 50 patients (mean age: 46.3 ± 12.5 years; 29 [68%] male) undergoing 52 revision ulnar nerve transpositions (UNTs). Pain VAS scores decreased significantly following revision UNT. Strength and DASH scores demonstrated nonsignificant improvements postoperatively. Worse preoperative pain and greater than 1 prior cubital tunnel procedure were significant predictors of worse postoperative average pain VAS scores. Patients can and do improve following revision cubital tunnel surgery, particularly as it relates to pain. Intraoperative findings during the revision procedure suggest that adherence to specific principles in the primary operation is key to prevention of secondary cubital tunnel syndrome.

  13. Revision hip preservation surgery with hip arthroscopy: clinical outcomes.

    Science.gov (United States)

    Domb, Benjamin G; Stake, Christine E; Lindner, Dror; El-Bitar, Youseff; Jackson, Timothy J

    2014-05-01

    To analyze and report the clinical outcomes of a cohort of patients who underwent revision hip preservation with arthroscopy and determine predictors of positive and negative outcomes. During the study period from April 2008 to December 2010, all patients who underwent revision hip preservation with arthroscopy were included. This included patients who had previous open surgery and underwent revision with arthroscopy. Patient-reported outcome (PRO) scores were obtained preoperatively and at 3-month, 1-year, 2-year, and 3-year follow-up time points. Any revision surgeries and conversions to total hip arthroplasty were noted. A multiple regression analysis was performed to look for positive and negative predictive factors for improvement in PROs after revision hip arthroscopy. Forty-seven hips in 43 patients had completed 2 years' follow-up or needed total hip arthroplasty. The mean length of follow-up was 29 months (range, 24 to 47 months). Of the hips, 31 (66%) had either unaddressed or incompletely treated femoroacetabular impingement. There was a significant improvement in all PRO scores at a mean of 29 months after revision (P arthroscopy can achieve moderately successful outcomes and remains a viable treatment strategy after failed primary hip preservation surgery. Preoperative predictors of success after revision hip arthroscopy include segmental labral defects, unaddressed or incompletely addressed femoroacetabular impingement, heterotopic ossification, and previous open surgery. Level IV, therapeutic case series. Copyright © 2014 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  14. A successful effort to involve stakeholders in a facility siting decision using LIPS with stakeholder involvement

    International Nuclear Information System (INIS)

    Merkhofer, L.; Conway, R.; Anderson, B.

    1995-01-01

    Local public opposition to federal bureaucratic decisions has resulted in public agencies rethinking the role of stakeholders in decision making. Efforts to include stakeholders directly in the decision-making process are on the increase. Unfortunately, many attempts to involve members of the public in decisions involving complex technical issues have failed. A key problem has been defining a meaningful role for the public in the process of arriving at a technical decision. This paper describes a successful effort by Sandia National Laboratories (SNL) in New Mexico to involve stakeholders in an important technical decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), a facility intended to consolidate and store wastes generated from the cleanup of hazardous waste sites. A formal priority setting process known as the Laboratory Integration Prioritization System (LIPS) was adapted to provide an approach for involving the public. Although rarely applied to stakeholder participation, the LIPS process proved surprisingly effective. It produced a consensus over a selected site and enhanced public trust and understanding of Project activities

  15. Activity Management System user reference manual. Revision 1

    International Nuclear Information System (INIS)

    Gates, T.A.; Burdick, M.B.

    1994-01-01

    The Activity Management System (AMS) was developed in response to the need for a simple-to-use, low-cost, user interface system for collecting and logging Hanford Waste Vitrification Plant Project (HWVP) activities. This system needed to run on user workstations and provide common user access to a database stored on a local network file server. Most important, users wanted a system that provided a management tool that supported their individual process for completing activities. Existing system treated the performer as a tool of the system. All AMS data is maintained in encrypted format. Users can feel confident that any activities they have entered into the database are private and that, as the originator, they retain sole control over who can see them. Once entered into the AMS database, the activities cannot be accessed by anyone other than the originator, the designated agent, or by authorized viewers who have been explicitly granted the right to look at specific activities by the originator. This user guide is intended to assist new AMS users in learning how to use the application and, after the initial learning process, will serve as an ongoing reference for experienced users in performing infrequently used functions. Online help screens provide reference to some of the key information in this manual. Additional help screens, encompassing all the applicable material in this manual, will be incorporated into future AMS revisions. A third, and most important, source of help is the AMS administrator(s). This guide describes the initial production version of AMS, which has been designated Revision 1.0

  16. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  17. A reliability analysis of the revised competitiveness index.

    Science.gov (United States)

    Harris, Paul B; Houston, John M

    2010-06-01

    This study examined the reliability of the Revised Competitiveness Index by investigating the test-retest reliability, interitem reliability, and factor structure of the measure based on a sample of 280 undergraduates (200 women, 80 men) ranging in age from 18 to 28 years (M = 20.1, SD = 2.1). The findings indicate that the Revised Competitiveness Index has high test-retest reliability, high inter-item reliability, and a stable factor structure. The results support the assertion that the Revised Competitiveness Index assesses competitiveness as a stable trait rather than a dynamic state.

  18. Baseline comparison report for Project W-058, Replacement of the cross-site transfer system. Revision 1

    International Nuclear Information System (INIS)

    Mendoza, D.P.

    1995-01-01

    This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed

  19. Impact of the economic downturn on total joint replacement demand in the United States: updated projections to 2021.

    Science.gov (United States)

    Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J

    2014-04-16

    Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total

  20. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  1. Digital Handover of Data from Building Projects to Building Operation

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  2. Electricity generation projections of the world and Brazil

    International Nuclear Information System (INIS)

    Dias, Marcio Soares

    2002-01-01

    The world use of electricity is projected to increase by 9,570 billions kWh over a span of 20 years. Natural gas is expected to account for the largest increment in electricity generation. As a result of high oil and natural gas consumption fuel prices are projected to rise in nominal dollars over the forecast horizon. Higher capacity utilisation and fewer expected retirements of running nuclear plants have resulted in a revision of EIA's projected consumption of electricity from nuclear power. Projection of 3.6%/year in the electricity consumption in Brazil is lower than the historical correlation given by the GDP (5%) growth rate plus 1.2 to 1.7%. GDP and energy consumption growth rates for Brazil are projected to be higher than the world value, but are lower than the projected values for countries like Mexico and China. Trends in primary fuel prices and external dependence on fuel supply are important factors for the Brazilian investments on electricity generation due their impact on costs and standard of living. (author)

  3. A Study of the Relationship of Geological Formation to the NORM

    International Nuclear Information System (INIS)

    Bursh, Talmage P.; Chriss, Derald

    1999-01-01

    Naturally Occurring Radioactive Materials (NORM) is a common and costly contaminant of produced waters associated with natural gas production and exploration. One way of combating this problem is by identifying the problem beforehand. Our approach to this problem involves development of NORM prediction capabilities based on the geological environment. During the tenth quarter of this project, emphasis again remained on two major tasks; identifying new sampling sites and seeking approval for final project revisions. In light of the delays experienced, the project has been granted a one year extension, and a revision is currently under review

  4. Ontario: linking nursing outcomes, workload and staffing decisions in the workplace: the Dashboard Project.

    Science.gov (United States)

    Fram, Nancy; Morgan, Beverley

    2012-03-01

    Research shows that nurses want to provide more input into assessing patient acuity, changes in patient needs and staffing requirements. The Dashboard Project involved the further development and application of an electronic monitoring tool that offers a single source of nursing, patient and organizational information. It is designed to help inform nurse staffing decisions within a hospital setting. The Dashboard access link was installed in computers in eight nursing units within the Hamilton Health Sciences (HHS) network. The Dashboard indicators are populated from existing information/patient databases within the Decision Support Department at HHS. Committees composed of the unit manager, staff nurses, project coordinator, financial controller and an information controller met regularly to review the Dashboard indicators. Participants discussed the ability of the indicators to reflect their patients' needs and the feasibility of using the indicators to inform their clinical staffing plans. Project findings suggest that the Dashboard is a work in progress. Many of the indicators that had originally been incorporated were refined and will continue to be revised based on suggestions from project participants and further testing across HHS. Participants suggested the need for additional data, such as the time that nurses are off the unit (for code blue response, patient transfers and accompanying patients for tests); internal transfers/bed moves to accommodate patient-specific issues and particularly to address infection control issues; deaths and specific unit-centred data in addition to the generic indicators. The collaborative nature of the project enabled staff nurses and management to work together on a matter of high importance to both, providing valuable recommendations for shared nursing and interprofessional planning, further Dashboard development and project management.

  5. Descriptive epidemiology of the Multicenter ACL Revision Study (MARS) cohort.

    Science.gov (United States)

    Wright, Rick W; Huston, Laura J; Spindler, Kurt P; Dunn, Warren R; Haas, Amanda K; Allen, Christina R; Cooper, Daniel E; DeBerardino, Thomas M; Lantz, Brett Brick A; Mann, Barton J; Stuart, Michael J

    2010-10-01

    Revision anterior cruciate ligament (ACL) reconstruction has worse outcomes than primary reconstructions. Predictors for these worse outcomes are not known. The Multicenter ACL Revision Study (MARS) Group was developed to perform a multisurgeon, multicenter prospective longitudinal study to obtain sufficient subjects to allow multivariable analysis to determine predictors of clinical outcome. To describe the formation of MARS and provide descriptive analysis of patient demographics and clinical features for the initial 460 enrolled patients to date in this prospective cohort. Cross-sectional study; Level of evidence, 2. After training and institutional review board approval, surgeons began enrolling patients undergoing revision ACL reconstruction, recording patient demographics, previous ACL reconstruction methods, intra-articular injuries, and current revision techniques. Enrolled subjects completed a questionnaire consisting of validated patient-based outcome measures. As of April 1, 2009, 87 surgeons have enrolled a total of 460 patients (57% men; median age, 26 years). For 89%, the reconstruction was the first revision. Mode of failure as deemed by the revising surgeon was traumatic (32%), technical (24%), biologic (7%), combination (37%), infection (MARS Group has been able to quickly accumulate the largest revision ACL reconstruction cohort reported to date. Traumatic reinjury is deemed by surgeons to be the most common single mode of failure, but a combination of factors represents the most common mode of failure. Allograft graft choice is more common in the revision setting than autograft. Concomitant knee injury is extremely common in this population.

  6. CDIO Projects in DTU’s B.Eng. in IT Study Program

    DEFF Research Database (Denmark)

    Sparsø, Jens; Bolander, Thomas; Fischer, Paul

    2011-01-01

    Since the fall 2008 all B.Eng. study programs at the Technical University of Denmark have been based on the CDIO concept. The adoption of the CDIO standards and principles resulted in new or significantly revised study programs. As part of this effort design-build projects have been introduced...... on each of the first 4 semesters, and each semester-project spans several courses. The aim of this paper is to describe the four CDIO semester projects in the B.Eng. in IT study, and – along with similar papers describing the other six B.Eng. programs – to provide documentation to accompany an exposition...

  7. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  8. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  9. Japan's involvement in oil sands development

    International Nuclear Information System (INIS)

    Sugiura, T.

    1994-01-01

    According to Japanese national policy, exploration and development by Japanese companies in overseas countries are promoted in order to ensure stable oil supplies. Japan Canada Oil Sands Limited (JACOS), part of the JAPEX group, was established during the 1978 world oil crisis to explore and develop Canadian oil sand resources in accordance with Japan's national policy. The JAPEX group, including JACOS, has invested $123 million in oil sands projects in Alberta. JAPEX's first involvement in oil sands was in the Primrose Project operated by Norcen in the Cold Lake area. Five years of cyclic steam stimulation pilot tests did not produce sufficiently good results to justify further operation. The second involvement was the PCEJ Project, a joint effort by four companies that are participating in a bitumen recovery test project in the Athabasca Deposit. JACOS holds 2,452 km 2 of oil sands leases in Alberta. Tests conducted since 1978 in the PCEJ Project include multiwell steam injection pilot tests, some of which showed promise. JACOS is also participating in steam assisted gravity drainage projects and in federal/provincial research programs. Obstacles identified in developing Alberta oil sands are the lack of a bitumen pipeline to Edmonton and the insufficient length of oil sands leases (currently 10 years), given the difficulties of oil sand development. 10 figs

  10. Letter of Map Revision

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — The National Flood Hazard Layer (NFHL) data incorporates all Digital Flood Insurance Rate Map(DFIRM) databases published by FEMA, and any Letters Of Map Revision...

  11. Revision without ordinals

    NARCIS (Netherlands)

    Rivello, Edoardo

    2013-01-01

    We show that Herzberger’s and Gupta’s revision theories of truth can be recast in purely inductive terms, without any appeal neither to the transfinite ordinal numbers nor to the axiom of Choice. The result is presented in an abstract and general setting, emphasising both its validity for a wide

  12. Program plan for shipment, receipt, and storage of the TMI-2 core. Revision 1

    International Nuclear Information System (INIS)

    Quinn, G.J.; Reno, H.W.; Schmitt, R.C.

    1985-01-01

    This plan addresses the preparation and shipment of core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL) and receipt and storage of that core debris. The Manager of the Nuclear Materials Evaluation Programs Division of EG and G Idaho, Inc. will manage two separate but integrated programs, one located at TMI (Part 1) and the other at INEL (Part 2). The Technical Integration Office (at TMI) is responsible for developing and implementing Part 1, TMI-2 Core Shipment Program. The Technical Support Branch (at INEL) is responsible for developing and implementing Part 2, TMI-2 Core Receipt and Storage. The plan described herein is a revision of a previous document entitled Plan for Shipment, Storage, and Examination of TMI-2 Fuel. This revision was required to delineate changes, primarily in Part 2, Core Activities Program, of the previous document. That part of the earlier document related to core examination was reidentified in mid-FY-1984 as a separate trackable entity entitled Core Sample Acquisition and Examination Project, which is not included here

  13. Smoking is associated with earlier time to revision of total knee arthroplasty.

    Science.gov (United States)

    Lim, Chin Tat; Goodman, Stuart B; Huddleston, James I; Harris, Alex H S; Bhowmick, Subhrojyoti; Maloney, William J; Amanatullah, Derek F

    2017-10-01

    Smoking is associated with early postoperative complications, increased length of hospital stay, and an increased risk of revision after total knee arthroplasty (TKA). However, the effect of smoking on time to revision TKA is unknown. A total of 619 primary TKAs referred to an academic tertiary center for revision TKA were retrospectively stratified according to the patient smoking status. Smoking status was then analyzed for associations with time to revision TKA using a Chi square test. The association was also analyzed according to the indication for revision TKA. Smokers (37/41, 90%) have an increased risk of earlier revision for any reason compared to non-smokers (274/357, 77%, p=0.031). Smokers (37/41, 90%) have an increased risk of earlier revision for any reason compared to ex-smokers (168/221, 76%, p=0.028). Subgroup analysis did not reveal a difference in indication for revision TKA (p>0.05). Smokers are at increased risk of earlier revision TKA when compared to non-smokers and ex-smokers. The risk for ex-smokers was similar to that of non-smokers. Smoking appears to have an all-or-none effect on earlier revision TKA as patients who smoked more did not have higher risk of early revision TKA. These results highlight the need for clinicians to urge patients not to begin smoking and encourage smokers to quit smoking prior to primary TKA. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. Hanford Site technical baseline database. Revision 1

    International Nuclear Information System (INIS)

    Porter, P.E.

    1995-01-01

    This report lists the Hanford specific files (Table 1) that make up the Hanford Site Technical Baseline Database. Table 2 includes the delta files that delineate the differences between this revision and revision 0 of the Hanford Site Technical Baseline Database. This information is being managed and maintained on the Hanford RDD-100 System, which uses the capabilities of RDD-100, a systems engineering software system of Ascent Logic Corporation (ALC). This revision of the Hanford Site Technical Baseline Database uses RDD-100 version 3.0.2.2 (see Table 3). Directories reflect those controlled by the Hanford RDD-100 System Administrator. Table 4 provides information regarding the platform. A cassette tape containing the Hanford Site Technical Baseline Database is available

  15. Publishing and Revising Content

    Science.gov (United States)

    Editors and Webmasters can publish content without going through a workflow. Publishing times and dates can be set, and multiple pages can be published in bulk. Making an edit to published content created a revision.

  16. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  17. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  18. Development and Psychometric Validation of the Family Outcomes Survey-Revised

    Science.gov (United States)

    Bailey, Donald B., Jr.; Raspa, Melissa; Olmsted, Murrey G.; Novak, Scott P.; Sam, Ann M.; Humphreys, Betsy P.; Nelson, Robin; Robinson, Nyle; Guillen, Chelsea

    2011-01-01

    Few psychometrically valid scales exist to assess family outcomes and the helpfulness of early intervention. This article describes the development and psychometric properties of the Family Outcomes Survey-Revised. The revision was prompted by the need to (a) create a new format that would be easier for parents to understand, (b) revise and expand…

  19. Influence of 4-H Horse Project Involvement on Development of Life Skills

    Science.gov (United States)

    Anderson, K. P.; Karr-Lilienthal, L.

    2011-01-01

    Four-H horse project members who competed in non-riding horse contests were surveyed to evaluate the influence of their horse project participation on life-skill development. Contests in which youth competed included Horse Bowl, Demonstrations, Public Speaking, and Art. Youth indicated a positive influence on both life-skill development and horse…

  20. Engaging clinicians in health informatics projects.

    Science.gov (United States)

    Caballero Muñoz, Erika; Hullin Lucay Cossio, Carola M

    2010-01-01

    This chapter gives an educational overview of: * The importance of the engagement of clinicians within a health informatics project * Strategies required for an effective involvement of clinicians throughout a change management process within a clinical context for the implementation of a health informatics project * The critical aspects for a successful implementation of a health informatics project that involves clinicians as end users * Key factors during the administration of changes during the implementation of an informatics project for an information system in clinical practice.

  1. Mathematics curriculum in Ireland: The ınfluence of PISA on the development of project maths

    Directory of Open Access Journals (Sweden)

    Liz Kirwan

    2015-12-01

    Full Text Available This article interrogates the extent to which the Organization for Economic Cooperation and Development (OECD through its Programme for International Student Assessment (PISA influenced the development of Project Maths, a new second-level mathematics education policy in Ireland. It argues that the Irish government, in its revision of mathematics education policy, was strongly influenced by PISA and that concern with the country’s ‘average’ placement in the international assessment was instrumental in defining the direction of the revision. It traces the genetic imprint of PISA on the development of curriculum policy, the new mathematics syllabus, its content and assessment. It argues that Project Maths sets out to follow closely the PISA conceptual framework. However, the analysis finds that Project Maths is not a mini-PISA but that the programme is comprised of two distinct approaches, on the one hand retaining the abstract, symbolic mathematics of sections of the pre-existing curriculum, while on the other emphasizing a PISA-like approach to pedagogy and to real-life problem solving.

  2. Age and Early Revision After Primary Total Hip Arthroplasty for Osteoarthritis.

    Science.gov (United States)

    Meyer, Zachary; Baca, Geneva; Rames, Richard; Barrack, Robert; Clohisy, John; Nam, Denis

    2017-11-01

    Prior reports have noted an increased risk of early revision among younger patients undergoing total hip arthroplasty (THA) but have been confounded by the inclusion of various diagnoses. The purpose of this study was to assess the revision rate and the time to revision for patients undergoing THA for osteoarthritis based on age. Patients with a diagnosis of osteoarthritis who underwent both primary and revision THA at the same institution were identified. The time between primary and revision surgery and the indication for revision were collected. Patients were stratified into 2 groups based on age at the time of primary THA: 64 years or younger (group 1) or 65 years or older (group 2). Between 1996 and 2016, a total of 4662 patients (5543 hips) underwent primary THA for a diagnosis of osteoarthritis. Of these, 100 patients (104 hips) received a revision THA (62 in group 1 and 42 in group 2). Mean age was 52.7±8.4 years in group 1 vs 73.4±6.3 years in group 2 (Pprimary to revision surgery was 3.0±3.2 years for group 1 and 1.1±2.1 years for group 2 (P=.001). Among patients undergoing primary THA for a diagnosis of osteoarthritis, younger age is not associated with an increased rate of early failure or revision. [Orthopedics. 2017; 40(6):e1069-e1073.]. Copyright 2017, SLACK Incorporated.

  3. Revision washout decreases implant capsule tissue culture positivity: a multicenter study.

    Science.gov (United States)

    Henry, Gerard D; Carson, Culley C; Wilson, Steven K; Wiygul, Jeremy; Tornehl, Chris; Cleves, Mario A; Simmons, Caroline J; Donatucci, Craig F

    2008-01-01

    Positive cultures, visible biofilm and confocal micrography confirm bacterial presence on clinically uninfected inflatable penile prostheses at revision surgery. Salvage irrigation has been proved to rescue patients with clinically infected inflatable penile prostheses. Similar washout at revision for noninfectious reasons significantly lowers subsequent infection rates. We investigated a larger series of patients for positive culture rates and evaluated implant capsule tissue culture rates before and after revision washout. At 4 institutions a total of 148 patients with inflatable penile prostheses underwent revision surgery for noninfectious reasons between June 2001 and September 2005. Swab cultures of the fluid around the pump and visible biofilm were obtained. Also, in 65 patients a wedge of tissue from the capsule that forms around the pump was cultured. After implant removal revision washout of the implant spaces was performed and a second wedge of tissue was cultured. Of the 148 patients 97 (66%) had positive bacterial swab cultures of the fluid around the pump or biofilm. A total of 124 isolates were cultured. Of the 65 implant capsule tissue cultures obtained before washout 28 (43%) were positive for bacteria, while 16 (25%) obtained after revision washout were positive. Positive cultures and visible bacterial biofilm are present on clinically uninfected inflatable penile prostheses at revision surgery in most patients. Revision washout appears to decrease the bacterial load on implant capsule tissue at revision surgery of inflatable penile prostheses for noninfectious reasons.

  4. Reaping the harvest: nursing student service involvement with a campus gardening project.

    Science.gov (United States)

    Ahonen, Kathleen; Lee, Carolyn; Daker, Emily

    2012-01-01

    The authors describe the development and incorporation of a multidisciplinary community garden as a service project in a baccalaureate nursing cohort in an urban university. The concepts of professional ethics and service, application of nutritional theory to a community cohort, and competencies in community health nursing are briefly discussed and applied to this service project.

  5. High proximal migration in cemented acetabular revisions operated with bone impaction grafting; 47 revision cups followed with RSA for 17 years.

    Science.gov (United States)

    Mohaddes, Maziar; Herberts, Peter; Malchau, Henrik; Johanson, Per-Erik; Kärrholm, Johan

    2017-05-12

    Bone impaction grafting is a biologically and mechanically appealing option in acetabular revision surgery, allowing restitution of the bone stock and restoration of the biomechanics. We analysed differences in proximal migration of the revision acetabular components when bone impaction grafting is used together with a cemented or an uncemented cup. 43 patients (47 hips), revised due to acetabular loosening and judged to have less than 50% host bone-implant contact were included. The hips were randomised to either an uncemented (n = 20) or a cemented (n = 27) revision cup. Radiostereometry and radiography was performed postoperatively, at 3 and 6 months, 1, 2, 3, 5, 7, 10 and 13 and 17 years postoperatively. Clinical follow-up was performed at 1, 2 and 5 years postoperatively and thereafter at the same interval as in the radiographic follow-up. There were no differences in the base line demographic data between the 2 groups. At the last follow-up (17 years) 14 hips (10 cemented, 4 uncemented) had been re-revised due to loosening. 3 additional cups (1 uncemented and 2 cemented) were radiographically loose. There was a higher early proximal migration in the cemented cups. Cups operated on with cement showed a higher early migration measured with RSA and also a higher number of late revisions. The reason for this is not known, but factors such as inclusion of cases with severe bone defects, use of smaller bone chips and issues related to the impaction technique might have had various degrees of influence.

  6. RCBI-II: The Second Revision of the Revised Cyber Bullying Inventory

    Science.gov (United States)

    Topcu, Çigdem; Erdur-Baker, Özgür

    2018-01-01

    The aim of this study is to update the Turkish version of the Revised Cyber Bullying Inventory (RCBI) and eliminate specific technology names. Validity and reliability tests were carried out with 1,803 high school students. The updated version of the RCBI yields valid and reliable scores measuring cyberbullying and victimization.

  7. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  8. Department of Physics' Involvement of the Impact Testing Project of the High Speed Civil Transport Program (HSCT)

    Science.gov (United States)

    VonMeerwall, Ernst D.

    1994-01-01

    The project involved the impact testing of a kevlar-like woven polymer material, PBO. The purpose was to determine whether this material showed any promise as a lightweight replacement material for jet engine fan containment. The currently used metal fan containment designs carry a high drag penalty due to their weight. Projectiles were fired at samples of PBO by means of a 0.5 inch diameter Helium powered gun. The Initial plan was to encase the samples inside a purpose-built steel "hot box" for heating and ricochet containment. The research associate's responsibility was to develop the data acquisition programs and techniques necessary to determine accurately the impacting projectile's velocity. Beyond this, the Research Associate's duties include any physical computations, experimental design, and data analysis necessary.

  9. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  10. The physics of the Manhattan Project

    CERN Document Server

    Reed, Bruce Cameron

    2015-01-01

    The development of nuclear weapons during the Manhattan Project is one of the most significant scientific events of the twentieth century. This revised and updated 3rd edition explores the challenges that faced the scientists and engineers of the Manhattan Project. It gives a clear introduction to fission weapons at the level of an upper-year undergraduate physics student by examining the details of nuclear reactions, their energy release, analytic and numerical models of the fission process, how critical masses can be estimated, how fissile materials are produced, and what factors complicate bomb design. An extensive list of references and a number of exercises for self-study are included. Links are given to several freely-available spreadsheets which users can use to run many of the calculations for themselves.

  11. Acidentes de trânsito: caracterização das vitimas segundo o "Revised Trauma Score" medido no período pré-hospitalar Accidentes de transito: caracterización de las víctimas según el "Revised Trauma Score" medido en el periodo pre-hospitalario Motor vehicle crash: victims' characterization throughout prehospital "Revised Trauma Score"

    Directory of Open Access Journals (Sweden)

    Marisa Amaro Malvestio

    2002-12-01

    Full Text Available O estudo descreve idade, sexo, aspectos do mecanismo e procedimentos realizados em. 643 acidentados de trânsito atendidos nas Marginais Tietê e Pinheiros, considerando os valores do Revised Trauma Score (RTS do período pré-hospitalar. As vítimas com RTS=12 somaram 90,8%, com RTS=11, 4,0% e RTSEste estudio tiene como obje tivo describer, considerando el Revised Trauma Score (RTS obtenido en el periodo pré hospitalario, edad, sexo, aspectos del mecanismo e procedimientos realizados en 643 víctimas de accidente de tránsito. Las víctimas con RTS=12 sumaron 90,8%, con RTS=11, 4,0% y RTSThis report describes age, gender, trauma mechanics aspects and procedures from 643 motor vehicle crashes, MVC, victims in Tietê and Pinheiros expressways, by considering the prehospital Revised Trauma Score (RTS. The RTS=12 victims' were 90,8%, with RTS=11 added 4,0% and in group with RTS<10, 5,2%. Among the RTS<10 victims, the pedestrians stand out (36,4%, the frontal impacts (24,2% and the projected (36,4% or trapped victims (15,1%, and those that received advanced life support procedures.The motorcyclists and the male victims with 21 with 30 years of age were predominant. This study is expected to contribute to a better assistance to MVC victims.

  12. Postoperative pain outcomes after transvaginal mesh revision.

    Science.gov (United States)

    Danford, Jill M; Osborn, David J; Reynolds, W Stuart; Biller, Daniel H; Dmochowski, Roger R

    2015-01-01

    Although the current literature discusses mesh complications including pain, as well as suggesting different techniques for removing mesh, there is little literature regarding pain outcomes after surgical removal or revision. The purpose of this study is to determine if surgical removal or revision of vaginal mesh improves patient's subjective complaints of pelvic pain associated with original placement of mesh. After obtaining approval from the Vanderbilt University Medical Center Institutional Review Board, a retrospective review of female patients with pain secondary to previous mesh placement who underwent excision or revision of vaginal mesh from January 2000 to August 2012 was performed. Patient age, relevant medical history including menopause status, previous hysterectomy, smoking status, and presence of diabetes, fibromyalgia, interstitial cystitis, and chronic pelvic pain, was obtained. Patients' postoperative pain complaints were assessed. Of the 481 patients who underwent surgery for mesh revision, removal or urethrolysis, 233 patients met our inclusion criteria. One hundred and sixty-nine patients (73 %) reported that their pain improved, 19 (8 %) reported that their pain worsened, and 45 (19 %) reported that their pain remained unchanged after surgery. Prior history of chronic pelvic pain was associated with increased risk of failure of the procedure to relieve pain (OR 0.28, 95 % CI 0.12-0.64, p = 0.003). Excision or revision of vaginal mesh appears to be effective in improving patients' pain symptoms most of the time. Patients with a history of chronic pelvic pain are at an increased risk of no improvement or of worsening pain.

  13. [The Use of Jumbo Cups in Revision Total Hip Arthroplasty].

    Science.gov (United States)

    von Roth, Philipp; Wassilew, Georgi I

    2017-10-01

    Extra-large uncemented jumbo cups are among the most common methods of acetabular revision. Jumbo cups do not contribute to bone stock restoration, and in the case of a subsequent revision, an even larger bone defect is to be expected. Thus, understanding long-term survival is essential. The present article discusses the literature relevant to this topic and addresses technical and implant-specific characteristics of jumbo cups. In summary, jumbo cups show an acceptable long-term survival rate, with aseptic loosening as the most common reason for revision and dislocation being the most common complication. Through the development of alternative revision systems, jumbo cups have lost their importance in today's practice. However, they can serve as a benchmark for studies of newer technologies in revision total hip arthroplasty. Georg Thieme Verlag KG Stuttgart · New York.

  14. Cement-in-cement acetabular revision with a constrained tripolar component.

    Science.gov (United States)

    Leonidou, Andreas; Pagkalos, Joseph; Luscombe, Jonathan

    2012-02-17

    Dislocation of a total hip replacement (THR) is common following total hip arthroplasty (THA). When nonoperative management fails to maintain reduction, revision surgery is considered. The use of constrained acetabular liners has been extensively described. Complete removal of the old cement mantle during revision THA can be challenging and is associated with significant complications. Cement-in-cement revision is an established technique. However, the available clinical and experimental studies focus on femoral stem revision. The purpose of this study was to present a case of cement-in-cement acetabular revision with a constrained component for recurrent dislocations and to investigate the current best evidence for this technique. This article describes the case of a 74-year-old woman who underwent revision of a Charnley THR for recurrent low-energy dislocations. A tripolar constrained acetabular component was cemented over the primary cement mantle following removal of the original liner by reaming, roughening the surface, and thoroughly irrigating and drying the primary cement. Clinical and radiological results were good, with the Oxford Hip Score improving from 11 preoperatively to 24 at 6 months postoperatively. The good short-term results of this case and the current clinical and biomechanical data encourage the use of the cement-in-cement technique for acetabular revision. Careful irrigation, drying, and roughening of the primary surface are necessary. Copyright 2012, SLACK Incorporated.

  15. Understanding errors in EIA projections of energy demand

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Carolyn; Herrnstadt, Evan; Morgenstern, Richard [Resources for the Future, 1616 P St. NW, Washington, DC 20036 (United States)

    2009-08-15

    This paper investigates the potential for systematic errors in the Energy Information Administration's (EIA) widely used Annual Energy Outlook, focusing on the near- to mid-term projections of energy demand. Based on analysis of the EIA's 22-year projection record, we find a fairly modest but persistent tendency to underestimate total energy demand by an average of 2 percent per year after controlling for projection errors in gross domestic product, oil prices, and heating/cooling degree days. For 14 individual fuels/consuming sectors routinely reported by the EIA, we observe a great deal of directional consistency in the errors over time, ranging up to 7 percent per year. Electric utility renewables, electric utility natural gas, transportation distillate, and residential electricity show significant biases on average. Projections for certain other sectors have significant unexplained errors for selected time horizons. Such independent evaluation can be useful for validating analytic efforts and for prioritizing future model revisions. (author)

  16. Learning effects of active involvement of secondary school students in scientific research within the Sparkling Science project "FlussAu:WOW!"

    Science.gov (United States)

    Poppe, Michaela; Zitek, Andreas; Scheikl, Sigrid; Heidenreich, Andrea; Kurz, Roman; Schrittwieser, Martin; Muhar, Susanne

    2014-05-01

    Due to immense technological and economic developments, human activities producing greenhouse gases, destructing ecosystems, changing landscapes and societies are influencing the world to such a degree, that the environment and human well-being are significantly affected. This results in a need to educate citizens towards a scientific understanding of complex socio-environmental systems. The OECD programme for international student assessment (PISA - http://www.pisa.oecd.org) investigated in detail the science competencies of 15-year-old students in 2006. The report documented that teenagers in OECD countries are mostly well aware of environmental issues but often know little about their causes or options to tackle these challenges in the future. For the integration of science with school learning and involving young people actively into scientific research Sparkling Science projects are funded by the Federal Ministry of Science and Research in Austria. Within the Sparkling Science Project "FlussAu:WOW!" (http://www.sparklingscience.at/de/projekte/574-flussau-wow-/) scientists work together with 15 to 18-year-old students of two Austrian High Schools over two years to assess the functions and processes in near natural and anthropogenically changed river floodplains. Within the first year of collaboration students, teachers and scientists elaborated on abiotic, biotic and spatial indicators for assessing and evaluating the ecological functionality of riverine systems. After a theoretical introduction students formulated research questions, hypotheses and planned and conducted field work in two different floodplain areas in Lower Austria. From the second year on, students are going to develop qualitative models on processes in river floodplain systems by means of the learning software "DynaLearn". The "DynaLearn" software is an engaging, interactive, hierarchically structured learning environment that was developed within the EU-FP7 project "DynaLearn" (http

  17. 14 CFR 152.323 - Budget revision: Airport development.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Budget revision: Airport development. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.323 Budget... change in the budget estimates, the sponsor shall submit a request for budget revision on a form...

  18. Pending revisions to ANS 56.8-81 containment systems leakage testing requirements

    International Nuclear Information System (INIS)

    Brown, T.M.

    1986-01-01

    The US Nuclear Regulatory Commission is currently processing a revision to Appendix J of Part 50, Title 10 of the Code of Federal Regulations. The revised Appendix J will not reference any ANSI standard. Processed concurrently with the revised Appendix J is a draft Regulatory Guide which does endorse ANS Standard 56.8. The draft Regulatory Guide currently takes many exceptions to the Standard. Many of the exceptions are changes the Working Group had in process and the exceptions are to bring the draft Regulatory Guide in line with the future Standard. The Working Group has completed their revisions to the Standard and its appendices. These revisions have been submitted to the Nuclear Power Plants Standards Committee (NUPPSCO). The NUPPSCO comments have recently been addressed by the Working Group and the Working Group response has been sent to the NUPPSCO commentators. This paper will discuss the revisions made to the Standard, the significance of the revisions and future tasks or Standard revisions which the ANS 56.8 Working Group may address

  19. Facility Interface Capability Assessment (FICA) project report

    International Nuclear Information System (INIS)

    Pope, R.B.; MacDonald, R.R.; Viebrock, J.M.; Mote, N.

    1995-09-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from commercial facilities. The objective of the Facility Interface Capability Assessment (FICA) project was to assess the capability of each commercial spent nuclear fuel (SNF) storage facility, at which SNF is stored, to handle various SNF shipping casks. The purpose of this report is to present and analyze the results of the facility assessments completed within the FICA project. During Phase 1, the data items required to complete the facility assessments were identified and the database for the project was created. During Phase 2, visits were made to 122 facilities on 76 sites to collect data and information, the database was updated, and assessments of the cask-handling capabilities at each facility were performed. Each assessment of cask-handling capability contains three parts: the current capability of the facility (planning base); the potential enhanced capability if revisions were made to the facility licensing and/or administrative controls; and the potential enhanced capability if limited physical modifications were made to the facility. The main conclusion derived from the planning base assessments is that the current facility capabilities will not allow handling of any of the FICA Casks at 49 of the 122 facilities evaluated. However, consideration of potential revisions and/or modifications showed that all but one of the 49 facilities could be adapted to handle at least one of the FICA Casks. For this to be possible, facility licensing, administrative controls, and/or physical aspects of the facility would need to be modified

  20. Facility Interface Capability Assessment (FICA) project report

    Energy Technology Data Exchange (ETDEWEB)

    Pope, R.B. [ed.] [Oak Ridge National Lab., TN (United States); MacDonald, R.R. [ed.] [Civilian Radioactive Waste Management System, Vienna, VA (United States); Viebrock, J.M.; Mote, N. [Nuclear Assurance Corp., Norcross, GA (United States)

    1995-09-01

    The US Department of Energy`s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from commercial facilities. The objective of the Facility Interface Capability Assessment (FICA) project was to assess the capability of each commercial spent nuclear fuel (SNF) storage facility, at which SNF is stored, to handle various SNF shipping casks. The purpose of this report is to present and analyze the results of the facility assessments completed within the FICA project. During Phase 1, the data items required to complete the facility assessments were identified and the database for the project was created. During Phase 2, visits were made to 122 facilities on 76 sites to collect data and information, the database was updated, and assessments of the cask-handling capabilities at each facility were performed. Each assessment of cask-handling capability contains three parts: the current capability of the facility (planning base); the potential enhanced capability if revisions were made to the facility licensing and/or administrative controls; and the potential enhanced capability if limited physical modifications were made to the facility. The main conclusion derived from the planning base assessments is that the current facility capabilities will not allow handling of any of the FICA Casks at 49 of the 122 facilities evaluated. However, consideration of potential revisions and/or modifications showed that all but one of the 49 facilities could be adapted to handle at least one of the FICA Casks. For this to be possible, facility licensing, administrative controls, and/or physical aspects of the facility would need to be modified.

  1. Comparing contemporary revision burden among hip and knee joint replacement registries

    Directory of Open Access Journals (Sweden)

    Brian J. McGrory, MD, MS

    2016-06-01

    Conclusions: Revision burden has gradually decreased for hip replacements and has remained relatively constant for knee replacements both for the last 4 years and compared to historic controls. Knee revision burden was lower than hip revision burden for each period examined. Revision burden is one measure that may be helpful in following the effect of changes in surgical technique and implant design over time in registry populations and may be a helpful way to compare overall results between registries.

  2. Using SQUIRE 2.0 as a Guide for Planning Your Quality Improvement Project.

    Science.gov (United States)

    Stausmire, Julie M; Ulrich, Charla

    2017-12-01

    This article is the third of a 4-part quality improvement resource series for critical care nurses interested in implementing system process or performance improvement projects. Part 1 defined the differences between research and quality improvement. Part 2 discussed how nurses and managers could identify meaningful quality improvement projects that will make a real difference in their critical care unit while fitting within their time constraints and resources. Part 3 uses the recently revised Standards for Quality Improvement Reporting Excellence guidelines as a basis for designing, implementing, documenting, and publishing quality improvement projects. © 2017 American Association of Critical-Care Nurses.

  3. Revision Hip Arthroscopy Indications and Outcomes: A Systematic Review.

    Science.gov (United States)

    Sardana, Vandit; Philippon, Marc J; de Sa, Darren; Bedi, Asheesh; Ye, Lily; Simunovic, Nicole; Ayeni, Olufemi R

    2015-10-01

    To identify the indications and outcomes in patients undergoing revision hip arthroscopy. The electronic databases Embase, Medline, HealthStar, and PubMed were searched from 1946 to July 19, 2014. Two blinded reviewers searched, screened, and evaluated the data quality of the studies using the Methodological Index for Non-Randomized Studies scale. Data were abstracted in duplicate. Agreement and descriptive statistics are presented. Six studies were included (3 prospective case series and 3 retrospective chart reviews), with a total of 448 hips examined. The most common indications for revision hip arthroscopy included residual femoroacetabular impingement (FAI), labral tears, and chondral lesions. The mean interval between revision arthroscopy and the index procedure was 25.6 months. Overall, the modified Harris Hip Score improved by a mean of 33.6% (19.3 points) from the baseline score at 1-year follow-up. In 14.6% of patients, further surgical procedures were required, including re-revision hip arthroscopy (8.0%), total hip replacement (5.6%), and hip resurfacing (1.0%). Female patients more commonly underwent revision hip arthroscopy (59.7%). The current evidence examined in this review supports revision hip arthroscopy as a successful intervention to improve functional outcomes (modified Harris Hip Score) and relieve pain in patients with residual symptoms after primary FAI surgery, although the outcomes are inferior when compared with a matched cohort of patients undergoing primary hip arthroscopy for FAI. The main indication for revision is a candidate who has symptoms due to residual cam- or pincer-type deformity that was either unaddressed or under-resected during the index operation. However, it is important to consider that the studies included in this review are of low-quality evidence. Surgeons should consider incorporating a minimum 2-year follow-up for individuals after index hip-preservation surgery because revisions tended to occur within this

  4. Recombination pattern reanalysis of some HIV-1 circulating recombination forms suggest the necessity and difficulty of revision.

    Directory of Open Access Journals (Sweden)

    Lei Jia

    Full Text Available Recombination is one of the major mechanisms underlying the generation of HIV-1 variability. Currently 61 circulating recombinant forms of HIV-1 have been identified. With the development of recombination detection techniques and accumulation of HIV-1 reference stains, more accurate mosaic structures of circulating recombinant forms (CRFs, like CRF04 and CRF06, have undergone repeated analysis and upgrades. Such revisions may also be necessary for other CRFs. Unlike previous studies, whose results are based primarily on a single recombination detection program, the current study was based on multiple recombination analysis, which may have produced more impartial results.Representative references of 3 categories of intersubtype recombinants were selected, including BC recombinants (CRF07 and CRF08, BG recombinants (CRF23 and CRF24, and BF recombinants (CRF38 and CRF44. They were reanalyzed in detail using both the jumping profile hidden Markov model and RDP3.The results indicate that revisions and upgrades are very necessary and the entire re-analysis suggested 2 types of revision: (i length of inserted fragments; and (ii number of inserted fragments. The reanalysis also indicated that determination of small regions of about 200 bases or fewer should be performed with more caution.Results indicated that the involvement of multiple recombination detection programs is very necessary. Additionally, results suggested two major challenges, one involving the difficulty of accurately determining the locations of breakpoints and the second involving identification of small regions of about 200 bases or fewer with greater caution. Both indicate the complexity of HIV-1 recombination. The resolution would depend critically on development of a recombination analysis algorithm, accumulation of HIV-1 stains, and a higher sequencing quality. With the changes in recombination pattern, phylogenetic relationships of some CRFs may also change. All these results may

  5. Revision of the tsunami catalogue affecting Turkish coasts and surrounding regions

    Directory of Open Access Journals (Sweden)

    Y. Altinok

    2011-02-01

    Full Text Available The coasts of Turkey have been hit by tsunamis in the past. The first national earthquake-tsunami catalogues were compiled in the early 1980s while the most up-to-date tsunami catalogues are mainly the products of recent European projects. The EU projects GITEC and GITEC-TWO (Genesis and Impact of Tsunamis on the European Coasts and TRANSFER (Tsunami Risk ANd Strategies For the European Region have added important contributions in establishing and developing unified criteria for tsunami parameterisation, standards for the quality of the data, the data format and the database general architecture. On the basis of these new aspects and based on recent marine geophysical data, tsunamigenic earthquakes, tsunami intensities and their reliability have been revised. The current version of the database contains 134 events, most of which have affected the Turkish coasts seriously during the last 3500 years. The reliability index of 76 events was "probable" and "definite", so that they could be used for assessment of the risk along the Turkish coastal region and for implementation of prevention policies.

  6. Rhinoplasty for the multiply revised nose.

    Science.gov (United States)

    Foda, Hossam M T

    2005-01-01

    To evaluate the problems encountered on revising a multiply operated nose and the methods used in correcting such problems. The study included 50 cases presenting for revision rhinoplasty after having had 2 or more previous rhinoplasties. An external rhinoplasty approach was used in all cases. Simultaneous septal surgery was done whenever indicated. All cases were followed for a mean period of 32 months (range, 1.5-8 years). Evaluation of the surgical result depended on clinical examination, comparison of pre- and postoperative photographs, and degree of patients' satisfaction with their aesthetic and functional outcome. Functionally, 68% suffered nasal obstruction that was mainly caused by septal deviations and nasal valve problems. Aesthetically, the most common deformities of the upper two thirds of the nose included pollybeak (64%), dorsal irregularities (54%), dorsal saddle (44%), and open roof deformity (42%), whereas the deformities of lower third included depressed tip (68%), tip contour irregularities (60%), and overrotated tip (42%). Nasal grafting was necessary in all cases; usually more than 1 type of graft was used in each case. Postoperatively, 79% of the patients, with preoperative nasal obstruction, reported improved breathing; 84% were satisfied with their aesthetic result; and only 8 cases (16%) requested further revision to correct minor deformities. Revision of a multiply operated nose is a complex and technically demanding task, yet, in a good percentage of cases, aesthetic as well as functional improvement are still possible.

  7. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2003-02-12

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

  8. The Effects of the Revised CPPNM on Legislative Framework

    International Nuclear Information System (INIS)

    Kwak, Sung-Woo; Yoo, Ho-Sik; Shim, Hye-Won; Chang, Sun-Young; Lee, Jong-Uk

    2006-01-01

    A Diplomatic Conference was held last July at Vienna of Austria and adopted an important Convention in physical protection field. The Convention is the revised Convention on Physical Protection of Nuclear Material. A State Party to the revised CPPNM has obligation to meet the Convention. Since the Amendment to CPPNM is expected to enter into force in near future, there is an urgent need to prepare for implementing the international obligation. Thus, it is important to assess the effect of the revised Convention on national legislative and regulatory framework to govern physical protection of domestic nuclear material and facilities. The objective of this paper is to perform comparative assessment between new provisions of the revised Convention and national law in order to prepare for the implementation of the international norm

  9. Goal-Oriented Data Collection Framework in Configuration Projects

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Kristjansdottir, Katrin

    2015-01-01

    project. The framework consists of five steps, which are; establishing a goal and the methods for stakeholder analysis, categorize and group the data collection, prioritizing of products and functionalities, collection and validation of the data by domain experts and finally analysis, documentation......This article proposes a systematic framework for data collection when executing Product Configuration System (PCS) projects. Since the data collection in PCS is one of the most time consuming tasks, a systematic framework to handle and manage the large amount of complex data in the early stages...... of the PCS project is needed. The framework was developed based on the current literature in the field and revised during testing at a case company. The framework has proven to provide a structural approach for data collection, which saved the company both time and money in the initial phases of the PCS...

  10. Committees for Ethics in Research involving human subjects.

    Science.gov (United States)

    Hossne, William Saad; Vieira, Sonia; De Freitas, Corina Bontempo Duca

    2008-01-01

    In Brazil since October 1996 there have been guidelines for research involving human subjects. Now human subjects know when their treatment is part of research. Deceit is no longer tolerated. But is not enough to say we offer an explanation to the potential subject and we offer a choice before he or she is confronted with an informed consent form. As in all professional activity, scientific investigation needs social controls. In Brazil, the ultimate responsibility of an investigation lies on the investigator, but in every institution where research is carried out there is a Committee for Ethics in Research. All Committees are subordinated to the National Commission of Ethics in Research, which is submitted to the Brazilian Institute of Health. During 2005 around 17,000 protocols involving 700,000 human subjects were revised by 475 Committees distributed all over the country. Approximately 7,000 people are now working in these Committees.

  11. Involvement of Amylin and Leptin in the Development of Projections from the Area Postrema to the Nucleus of the Solitary Tract

    Directory of Open Access Journals (Sweden)

    Kathrin Abegg

    2017-11-01

    Full Text Available The area postrema (AP and the nucleus of the solitary tract (NTS are important hindbrain centers involved in the control of energy homeostasis. The AP mediates the anorectic action and the inhibitory effect on gastric emptying induced by the pancreatic hormone amylin. Amylin’s target cells in the AP project to the NTS, an integrative relay center for enteroceptive signals. Perinatal hormonal and metabolic factors influence brain development. A postnatal surge of the adipocyte-derived hormone leptin represents a developmental signal for the maturation of projections between hypothalamic nuclei controlling energy balance. Amylin appears to promote neurogenesis in the AP in adult rats. Here, we examined whether amylin and leptin are required for the development of projections from the AP to the NTS in postnatal and adult mice by conducting neuronal tracing studies with DiI in amylin- (IAPP−/− and leptin-deficient (ob/ob mice. Compared to wild-type littermates, postnatal (P10 and adult (P60 IAPP−/− mice showed a significantly reduced density of AP-NTS projections. While AP projections were also reduced in postnatal (P14 ob/ob mice, AP-NTS fiber density did not differ between adult ob/ob and wild-type animals. Our findings suggest a crucial function of amylin for the maturation of neuronal brainstem pathways controlling energy balance and gastrointestinal function. The impaired postnatal development of neuronal AP-NTS projections in ob/ob mice appears to be compensated in this experimental model during later brain maturation. It remains to be elucidated whether an amylin- and leptin-dependent modulation in neuronal development translates into altered AP/NTS-mediated functions.

  12. Learning with multiple representations: an example of a revision lesson in mechanics

    Science.gov (United States)

    Wong, Darren; Poo, Sng Peng; Eng Hock, Ng; Loo Kang, Wee

    2011-03-01

    We describe an example of learning with multiple representations in an A-level revision lesson on mechanics. The context of the problem involved the motion of a ball thrown vertically upwards in air and studying how the associated physical quantities changed during its flight. Different groups of students were assigned to look at the ball's motion using various representations: motion diagrams, vector diagrams, free-body diagrams, verbal description, equations and graphs, drawn against time as well as against displacement. Overall, feedback from students about the lesson was positive. We further discuss the benefits of using computer simulation to support and extend student learning.

  13. Biomedical research involving patients with disorders of consciousness: ethical and legal dimensions

    Directory of Open Access Journals (Sweden)

    Michele Farisco

    2014-09-01

    Full Text Available The directive 2001/20/UE and the research involving patients with docs. Research involving patients with disorders of consciousness (DOCs deserves special ethical and legal attention because of its Janus-faced nature. On the one hand, it raises concerns about the risk to expose the involved subjects to disproportionate risks not respecting their individual dignity, particularly their right to be cared for; on the other hand, research is an essential tool in order to improve the clinical condition of patients with DOCs. The present paper concerns the ethical and legal dimensions of biomedical research involving patients with disorders of consciousness. In particular, it focuses on informed consent to experimental treatments, which is a challenging issue both from an ethical and legal point of view. The first part reads the Directive 2001/20/EU in the light of the experimentation of patients with DOCs, and suggests a revision in order to better assess the issue of informed consent. The particular case of informed consent for observational studies of non-communicative patients. The second part presents an informed consent form for studies through video-recording of patients unable to communicate their own consent. This form has been elaborated by the bioethics unit of the project "Review of the nosography of vegetative states: application of methods of behavioral analysis to individuals in coma or vegetative state" developed at the Italian National Institute of Health. Relevance of the suggested form. The paper describes the conceptual framework of the form for informed consent to studies through video-recoding, which is a relevant example of what issues should be included in an informed consent for any type of studies through video-recording of patients unable to express their own consent. The article has been sent on November the 7th 2013, before the adoption of the Regulation (EU no. 536/2014 (and consequent abrogation of the Directive 2001

  14. The Asian Development Bank's past and future involvement in financing gas projects in developing member countries of the Bank

    International Nuclear Information System (INIS)

    Chua, S.B.

    1991-01-01

    This paper presents a review of the Bank's involvement in financing gas projects in its developing member countries (DMC's). The paper highlights the scope of the Bank's past activities in the sector, the DMC's which had received assistance from the Bank, the types of projects financed by the Bank, the benefits expected to be derived from the projects, and the past problems encountered by the Bank. The operational framework under which past Bank lending to the gas sector was conducted is also described. The prospects of natural gas playing a prominent role as an environmentally preferred energy source to oil and coal are outlined. Indications of the direction of the Bank's future efforts to help its gas-resource-rich as well as its gas-resource-poor DMC's to quicken the use of natural gas are given. While emphasizing the Bank's contributions in helping its DMC's to increase gas supply to alleviate energy shortages, the paper stresses the important role the Bank has played and will play in institution-building and sector-development work. The paper explores the possibility for the Bank to expand its operations in the gas sector which will lead to the efficient and accelerated development of a clean energy source that will help its DMC's avoid a third oil crisis and reduce the damaging build-up of a greenhouse gas which now threatens to harm the global environment

  15. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  16. Application of environmental impact assessment in Spain (1989-2008): the case of Road Projects

    International Nuclear Information System (INIS)

    Barbero Rodriguez, J.; Espigares Pinilla, T.

    2010-01-01

    In this study we analyze the application in Spain of the Environmental Impact Assessment (EIA) along the first 20 years since its implementation, paying special attention to road projects. We revised all Environmental Impact Statement (EISs) published during the period 1989-2008 and monitored, among others, the following variables; the record of decision (favorable or unfavorable) of the State Authority, the type of ecosystem affected by the projects and the mitigation measures required to the developer to implement the project. The results allow us to evaluate the effectiveness of EIA procedure for road projects and to suggest some practical recommendations to improve the quality of EISs. (Author) 13 refs.

  17. NRC revision to 10 CFR Part 20

    International Nuclear Information System (INIS)

    Baker, R.E.; Cool, W.S.; Mills, W.A.

    1983-01-01

    The Nuclear Regulatory Commission's pollution standards have been revised since publication in the late 1950s, but the basic approach has not changed. The revisions resulted in inaccuracies, conflicts, and ambiguities in requirements. The need for comprehensive updating including radiation-protection principles, risk, occupational exposure dose limits, standards for the public (including de minimis level), surveys and monitoring, disposal into sewerage systems, and records is discussed. 2 tables

  18. The TULIP Project.

    Science.gov (United States)

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  19. Evidence-based development of school-based and family-involved prevention of overweight across Europe: The ENERGY-project's design and conceptual framework

    Directory of Open Access Journals (Sweden)

    Klepp Knut

    2010-05-01

    Full Text Available Abstract Background There is an urgent need for more carefully developed public health measures in order to curb the obesity epidemic among youth. The overall aim of the "EuropeaN Energy balance Research to prevent excessive weight Gain among Youth" (ENERGY-project is the development and formative evaluation of a theory-informed and evidence-based multi-component school-based and family-involved intervention program ready to be implemented and evaluated for effectiveness across Europe. This program aims at promoting the adoption or continuation of health behaviors that contribute to a healthy energy balance among school-aged children. Earlier studies have indicated that school and family environments are key determinants of energy-balance behaviors in schoolchildren. Schools are an important setting for health promotion in this age group, but school-based interventions mostly fail to target and involve the family environment. Methods Led by a multidisciplinary team of researchers from eleven European countries and supported by a team of Australian experts, the ENERGY-project is informed by the Environmental Research Framework for Weight gain Prevention, and comprises a comprehensive epidemiological analysis including 1 systematic reviews of the literature, 2 secondary analyses of existing data, 3 focus group research, and 4 a cross European school-based survey. Results and discussion The theoretical framework and the epidemiological analysis will subsequently inform stepwise intervention development targeting the most relevant energy balance-related behaviors and their personal, family-environmental and school-environmental determinants applying the Intervention Mapping protocol. The intervention scheme will undergo formative and pilot evaluation in five countries. The results of ENERGY will be disseminated among key stakeholders including researchers, policy makers and the general population. Conclusions The ENERGY-project is an international

  20. Model-based and model-free Pavlovian reward learning: revaluation, revision, and revelation.

    Science.gov (United States)

    Dayan, Peter; Berridge, Kent C

    2014-06-01

    Evidence supports at least two methods for learning about reward and punishment and making predictions for guiding actions. One method, called model-free, progressively acquires cached estimates of the long-run values of circumstances and actions from retrospective experience. The other method, called model-based, uses representations of the environment, expectations, and prospective calculations to make cognitive predictions of future value. Extensive attention has been paid to both methods in computational analyses of instrumental learning. By contrast, although a full computational analysis has been lacking, Pavlovian learning and prediction has typically been presumed to be solely model-free. Here, we revise that presumption and review compelling evidence from Pavlovian revaluation experiments showing that Pavlovian predictions can involve their own form of model-based evaluation. In model-based Pavlovian evaluation, prevailing states of the body and brain influence value computations, and thereby produce powerful incentive motivations that can sometimes be quite new. We consider the consequences of this revised Pavlovian view for the computational landscape of prediction, response, and choice. We also revisit differences between Pavlovian and instrumental learning in the control of incentive motivation.

  1. Potential Involvement of Draxin in the Axonal Projection of Cranial Nerves, Especially Cranial Nerve X, in the Chick Hindbrain.

    Science.gov (United States)

    Zhang, Sanbing; Cui, Huixian; Wang, Lei; Kang, Lin; Huang, Guannan; Du, Juan; Li, Sha; Tanaka, Hideaki; Su, Yuhong

    2016-07-01

    The appropriate projection of axons within the nervous system is a crucial component of the establishment of neural circuitry. Draxin is a repulsive axon guidance protein. Draxin has important functions in the guidance of three commissures in the central nervous system and in the migration of neural crest cells and dI3 interneurons in the chick spinal cord. Here, we report that the distribution of the draxin protein and the location of 23C10-positive areas have a strong temporal and spatial correlation. The overexpression of draxin, especially transmembrane draxin, caused 23C10-positive axon bundles to misproject in the dorsal hindbrain. In addition, the overexpression of transmembrane draxin caused abnormal formation of the ganglion crest of the IX and X cranial nerves, misprojection of some anti-human natural killer-1 (HNK-1)-stained structures in the dorsal roof of the hindbrain, and a simultaneous reduction in the efferent nerves of some motoneuron axons inside the hindbrain. Our data reveal that draxin might be involved in the fascicular projection of cranial nerves in the hindbrain. © 2016 The Histochemical Society.

  2. Revised CDM baseline study on fuel use and manure management at household level

    Energy Technology Data Exchange (ETDEWEB)

    Buysman, E.; Bryan, S.; Pino, M.

    2010-05-15

    This report presents the revised study of the original CDM baseline study conducted in 2006. The original study was conducted under the authority of the National Biogas Program (NBP), to study the potential GHG mitigation resulting from the adoption of domestic biodigesters. In the beginning of June 2006, a survey amongst 300 randomly selected households with the technical potential for a biodigester was conducted in the NBP's 6-targeted provinces (Kampong Cham, Svay Rieng, Prey Veng, Kampong Speu, Takeo and Kandal) in southeast Cambodia. The revised baseline study includes two additional provinces, Kampot and Kampong Chhnang. The survey showed that a significant proportion of the households have no access to basic sanitation and often have health problems. They consume mainly wood as cooking fuel and the majority use inefficient cooking stoves. The main lighting fuel is kerosene. The GHG emissions were calculated for each type of Animal Waste Management System (AWMS) and the baseline fuel consumption. The main methodology used is the GS-VER biodigester methodology and the IPCC 2006 guidelines to ex-ante estimate baseline, project and the emission reductions. The GHG emission from wood burning is only considered when it originates from a non-renewable source. The NRB analysis determined a NRB share of 70.7% for both collected and purchased wood. Total GHG emission is calculated by combining AWMS and wood fuels emissions. The annual baseline and project emission was estimated to be respectively 5.38 tCO2eq and 0.46 tCO2eq per average household, the emission reductions (ER) are therefore 4.92 tCO2eq/household/year.

  3. Sum rules and other properties involving resonance projection operators. [for optical potential description of electron scattering from atoms and ions

    Science.gov (United States)

    Berk, A.; Temkin, A.

    1985-01-01

    A sum rule is derived for the auxiliary eigenvalues of an equation whose eigenspectrum pertains to projection operators which describe electron scattering from multielectron atoms and ions. The sum rule's right-hand side depends on an integral involving the target system eigenfunctions. The sum rule is checked for several approximations of the two-electron target. It is shown that target functions which have a unit eigenvalue in their auxiliary eigenspectrum do not give rise to well-defined projection operators except through a limiting process. For Hylleraas target approximations, the auxiliary equations are shown to contain an infinite spectrum. However, using a Rayleigh-Ritz variational principle, it is shown that a comparatively simple aproximation can exhaust the sum rule to better than five significant figures. The auxiliary Hylleraas equation is greatly simplified by conversion to a square root equation containing the same eigenfunction spectrum and from which the required eigenvalues are trivially recovered by squaring.

  4. Effect of graft choice on the outcome of revision anterior cruciate ligament reconstruction in the Multicenter ACL Revision Study (MARS) Cohort

    Science.gov (United States)

    Wright, Rick W.; Huston, Laura J.; Haas, Amanda K.; Spindler, Kurt P.; Nwosu, Sam K.; Allen, Christina R.; Anderson, Allen F.; Cooper, Daniel E.; DeBerardino, Thomas M.; Dunn, Warren R.; Lantz, Brett (Brick) A.; Stuart, Michael J.; Garofoli, Elizabeth A.; Albright, John P.; Amendola, Annunziato (Ned); Andrish, Jack T.; Annunziata, Christopher C.; Arciero, Robert A.; Bach, Bernard R.; Baker, Champ L.; Bartolozzi, Arthur R.; Baumgarten, Keith M.; Bechler, Jeffery R.; Berg, Jeffrey H.; Bernas, Geoffrey A.; Brockmeier, Stephen F.; Brophy, Robert H.; Bush-Joseph, Charles A.; Butler, J. Brad; Campbell, John D.; Carey, James L.; Carpenter, James E.; Cole, Brian J.; Cooper, Jonathan M.; Cox, Charles L.; Creighton, R. Alexander; Dahm, Diane L.; David, Tal S.; Flanigan, David C.; Frederick, Robert W.; Ganley, Theodore J.; Gatt, Charles J.; Gecha, Steven R.; Giffin, James Robert; Hame, Sharon L.; Hannafin, Jo A.; Harner, Christopher D.; Harris, Norman Lindsay; Hechtman, Keith S.; Hershman, Elliott B.; Hoellrich, Rudolf G.; Hosea, Timothy M.; Johnson, David C.; Johnson, Timothy S.; Jones, Morgan H.; Kaeding, Christopher C.; Kamath, Ganesh V.; Klootwyk, Thomas E.; Levy, Bruce A.; Ma, C. Benjamin; Maiers, G. Peter; Marx, Robert G.; Matava, Matthew J.; Mathien, Gregory M.; McAllister, David R.; McCarty, Eric C.; McCormack, Robert G.; Miller, Bruce S.; Nissen, Carl W.; O'Neill, Daniel F.; Owens, Brett D.; Parker, Richard D.; Purnell, Mark L.; Ramappa, Arun J.; Rauh, Michael A.; Rettig, Arthur C.; Sekiya, Jon K.; Shea, Kevin G.; Sherman, Orrin H.; Slauterbeck, James R.; Smith, Matthew V.; Spang, Jeffrey T.; Svoboda, Steven J.; Taft, Timothy N.; Tenuta, Joachim J.; Tingstad, Edwin M.; Vidal, Armando F.; Viskontas, Darius G.; White, Richard A.; Williams, James S.; Wolcott, Michelle L.; Wolf, Brian R.; York, James J.

    2015-01-01

    Background Most surgeons believe that graft choice for ACL reconstruction is an important factor related to outcome. Although graft choice may be limited in the revision setting based on previously used grafts, it is still felt to be important. Hypothesis The purpose of this study was to determine if revision ACL graft choice predicts outcomes related to sports function, activity level, OA symptoms, graft re-rupture, and reoperation at two years following revision reconstruction. We hypothesized that autograft use would result in increased sports function, increased activity level, and decreased OA symptoms (as measured by validated patient reported outcome instruments). Additionally, we hypothesized that autograft use would result in decreased graft failure and reoperation rate 2 years following revision ACL reconstruction. Study Design Prospective cohort study; Level of evidence, 2. Methods Revision ACL reconstruction patients were identified and prospectively enrolled by 83 surgeons over 52 sites. Data collected included baseline demographics, surgical technique and pathology, and a series of validated patient reported outcome instruments (IKDC, KOOS, WOMAC, and Marx activity rating score). Patients were followed up at 2 years, and asked to complete the identical set of outcome instruments. Incidence of additional surgery and reoperation due to graft failure were also recorded. Multivariate regression models were used to determine the predictors (risk factors) of IKDC, KOOS, WOMAC, Marx scores, graft re-rupture, and reoperation rate at 2 years following revision surgery. Results 1205 patients were successfully enrolled with 697 (58%) males. Median age was 26. In 88% this was their first revision. 341 (28%) were undergoing revision by the surgeon that had performed the previous reconstruction. 583 (48%) underwent revision reconstruction utilizing an autograft, 590 (49%) allograft, and 32 (3%) both autograft and allograft. Median time since their last ACL

  5. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  6. 9 CFR 108.6 - Revision of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Revision of plot plans, blueprints... FACILITY REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.6 Revision of plot plans, blueprints, and legends... changes affecting the workflow are to be made. The licensee shall: (a) Prepare revised plot plans...

  7. Poorer survival after a primary implant during revision total knee arthroplasty

    NARCIS (Netherlands)

    Meijer, Marrigje F.; Reininga, Inge H. F.; Boerboom, Alexander L.; Stevens, Martin; Bulstra, Sjoerd K.

    Revision total knee arthroplasty (rTKA) is a complex procedure. Depending on the degree of ligament and bone damage, either primary or revision implants are used. The purpose of this study was to compare survival rates of primary implants with revision implants when used during rTKA. A retrospective

  8. Identifying challenges in project consultants engagement practices

    Science.gov (United States)

    Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul

    2017-10-01

    Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.

  9. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  10. Revision of Pachycentria (Melastomataceae)

    NARCIS (Netherlands)

    Clausing, Gudrun

    2000-01-01

    A revision of Pachycentria Blume, which includes the monotypic Pogonanthera Blume, is presented. Pachycentria comprises eight species and one subspecies. Two species, P. vogelkopensis and P. hanseniana, are newly described. The genus is distinguished from other genera in the Medinillinae by a small

  11. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  12. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  13. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  14. Human-system interface design review guideline -- Reviewer`s checklist: Final report. Revision 1, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant`s HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 2 is a complete set of the guidelines contained in Volume 1, Part 2, but in a checklist format that can be used by reviewers to assemble sets of individual guidelines for use in specific design reviews. The checklist provides space for reviewers to enter guidelines evaluations and comments.

  15. Human-system interface design review guideline -- Process and guidelines: Final report. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    1996-06-01

    NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant's HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 1 consists of two major parts. Part 1 describes those aspects of the review process of the HSI design that are important to identifying and resolving human engineering discrepancies. Part 2 contains detailed guidelines for a human factors engineering review which identify criteria for assessing the implementation of an applicant's or licensee's HSI design

  16. Revised accident source terms and control room habitability

    International Nuclear Information System (INIS)

    Lahti, G.P.; Hubner, R.S.; Johnson, W.J.; Schwartz, B.C.

    1993-01-01

    In April 1992, the NRC staff presented to the Commissioners the draft NUREG open-quotes Revised Accident Source Terms for Light-Water Nuclear Power Plants.close quotes This document is the culmination of more than ten years of NRC-sponsored research and represents the first change in the NRC's position on source terms since TID-14844 was issued in 1962. The purpose of this paper is to investigate the impact of the revised source terms on the current approach to analyzing control room habitability as required by 10 CFR 50. Sample calculations are presented that identify aspects of the model requiring clarification before the implementation of the revised source terms. 6 refs., 4 tabs

  17. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 7

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. [ed.; Baker, D.A.; Chamness, M.A. [and others

    1995-09-01

    This seventh revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology, hydrology, environmental monitoring, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors. Chapter 5.0 was not updated from the sixth revision (1994). It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE Orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

  18. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. [ed.; Baker, D.A.; Chamness, M.A. [and others

    1994-08-01

    This sixth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors; Chapter 5.0 has been significantly updated from the fifth revision. It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions; The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be utilized directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

  19. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 6

    International Nuclear Information System (INIS)

    Cushing, C.E.; Baker, D.A.; Chamness, M.A.

    1994-08-01

    This sixth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors; Chapter 5.0 has been significantly updated from the fifth revision. It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions; The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be utilized directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts

  20. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  1. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  2. Quantifying Engagement: Measuring Player Involvement in Human-Avatar Interactions

    Science.gov (United States)

    Norris, Anne E.; Weger, Harry; Bullinger, Cory; Bowers, Alyssa

    2014-01-01

    This research investigated the merits of using an established system for rating behavioral cues of involvement in human dyadic interactions (i.e., face-to-face conversation) to measure involvement in human-avatar interactions. Gameplay audio-video and self-report data from a Feasibility Trial and Free Choice study of an effective peer resistance skill building simulation game (DRAMA-RAMA™) were used to evaluate reliability and validity of the rating system when applied to human-avatar interactions. The Free Choice study used a revised game prototype that was altered to be more engaging. Both studies involved girls enrolled in a public middle school in Central Florida that served a predominately Hispanic (greater than 80%), low-income student population. Audio-video data were coded by two raters, trained in the rating system. Self-report data were generated using measures of perceived realism, predictability and flow administered immediately after game play. Hypotheses for reliability and validity were supported: Reliability values mirrored those found in the human dyadic interaction literature. Validity was supported by factor analysis, significantly higher levels of involvement in Free Choice as compared to Feasibility Trial players, and correlations between involvement dimension sub scores and self-report measures. Results have implications for the science of both skill-training intervention research and game design. PMID:24748718

  3. A summary of the environmental restoration program retrieval demonstration project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    McQuary, J.

    1991-02-01

    This report provides a summary of the Environmental Restoration Program's Retrieval Demonstration Project at the Idaho National Engineering Laboratory. This project developed concepts for demonstrating facilities and equipment for the retrieval of buried transuranic mixed waste at the INEL. Included is a brief assessment of the viability, cost effectiveness, and safety of retrieval based on the developed concept. Changes made in Revision 1 reflect editorial changes only. 31 refs., 1 fig

  4. Worldwide transportation/energy demand, 1975-2000. Revised Variflex model projections

    Energy Technology Data Exchange (ETDEWEB)

    Ayres, R.U.; Ayres, L.W.

    1980-03-01

    The salient features of the transportation-energy relationships that characterize the world of 1975 are reviewed, and worldwide (34 countries) long-range transportation demand by mode to the year 2000 is reviewed. A worldwide model is used to estimate future energy demand for transportation. Projections made by the forecasting model indicate that in the year 2000, every region will be more dependent on petroleum for the transportation sector than it was in 1975. This report is intended to highlight certain trends and to suggest areas for further investigation. Forecast methodology and model output are described in detail in the appendices. The report is one of a series addressing transportation energy consumption; it supplants and replaces an earlier version published in October 1978 (ORNL/Sub-78/13536/1).

  5. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  6. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  7. Revised SWAT. The integrated burnup calculation code system

    International Nuclear Information System (INIS)

    Suyama, Kenya; Mochizuki, Hiroki; Kiyosumi, Takehide

    2000-07-01

    SWAT is an integrated burnup code system developed for analysis of post irradiation examination, transmutation of radioactive waste, and burnup credit problem. This report shows an outline and a user's manual of revised SWAT. This revised SWAT includes expansion of functions, increasing supported machines, and correction of several bugs reported from users of previous SWAT. (author)

  8. Revised SWAT. The integrated burnup calculation code system

    Energy Technology Data Exchange (ETDEWEB)

    Suyama, Kenya; Mochizuki, Hiroki [Department of Fuel Cycle Safety Research, Nuclear Safety Research Center, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai, Ibaraki (Japan); Kiyosumi, Takehide [The Japan Research Institute, Ltd., Tokyo (Japan)

    2000-07-01

    SWAT is an integrated burnup code system developed for analysis of post irradiation examination, transmutation of radioactive waste, and burnup credit problem. This report shows an outline and a user's manual of revised SWAT. This revised SWAT includes expansion of functions, increasing supported machines, and correction of several bugs reported from users of previous SWAT. (author)

  9. Text Revision in Deaf and Hearing Bilingual Students

    Science.gov (United States)

    Teruggi, Lilia A.; Gutiérrez-Cáceres, Rafaela

    2016-01-01

    In this study we explored the revision process and strategies implemented by deaf and hearing students who attend the same bilingual school context (LIS and Italian). For that we analysed and compared the types and quality of revisions made by deaf and hearing participants to their first draft of a narrative text ("Frog, Where Are You?")…

  10. Revised Paris and Vienna Nuclear Liability Conventions - Challenges for Nuclear Insurers

    International Nuclear Information System (INIS)

    Tetley, M.

    2006-01-01

    The revisions recently implemented to both the Vienna and Paris nuclear liability Conventions are intended to widen significantly the amount and scope of compensation payable in the event of a nuclear accident. Whilst this is a laudable objective, the final extent of the revisions leaves nuclear site operators and their insurers with greater uncertainty as a result of the wider and unquantifiable nature of some aspects of the revised nuclear damage definition, in particular where reference is made to environmental reinstatement and extended prescription periods. Incorporating broader definitions in the Convention revisions will therefore leave gaps in the insurance cover where insurers are unable to insure the new, wider scope of cover. If no insurance is available, then the liability for the revised scope of cover must fall upon either the operator or the national Government. This presentation will give an overview of where and why the major gaps in nuclear liability insurance cover will occur in the revised Conventions; it will also examine the problems in defining the revised scope of cover and will look at where these unquantifiable risks should now reside, to ensure there is equity between the liabilities imposed on the nuclear industry and those imposed on other industrial sectors. (author)

  11. The Cedar Project: resilience in the face of HIV vulnerability within a cohort study involving young Indigenous people who use drugs in three Canadian cities.

    Science.gov (United States)

    Pearce, Margo E; Jongbloed, Kate A; Richardson, Chris G; Henderson, Earl W; Pooyak, Sherri D; Oviedo-Joekes, Eugenia; Christian, Wunuxtsin M; Schechter, Martin T; Spittal, Patricia M

    2015-10-29

    Indigenous scholars have long argued that it is critical for researchers to identify factors related to cultural connectedness that may protect against HIV and hepatitis C infection and buffer the effects of historical and lifetime trauma among young Indigenous peoples. To our knowledge, no previous epidemiological studies have explored the effect of historical and lifetime traumas, cultural connectedness, and risk factors on resilience among young, urban Indigenous people who use drugs. This study explored risk and protective factors associated with resilience among participants of the Cedar Project, a cohort study involving young Indigenous peoples who use illicit drugs in three cities in British Columbia, Canada. We utilized the Connor-Davidson Resilience Scale to measure resilience, the Childhood Trauma Questionnaire to measure childhood maltreatment, and the Symptom-Checklist 90-Revised to measure psychological distress among study participants. Multivariate linear mixed effects models (LME) estimated the effect of study variables on mean change in resilience scores between 2011-2012. Among 191 participants, 92 % had experienced any form of childhood maltreatment, 48 % had a parent who attended residential school, and 71 % had been in foster care. The overall mean resilience score was 62.04, with no differences between the young men and women (p = 0.871). Adjusted factors associated with higher mean resilience scores included having grown up in a family that often/always lived by traditional culture (B = 7.70, p = 0.004) and had often/always spoken their traditional language at home (B = 10.52, p resilience scores. Adjusted factors associated with diminished mean resilience scores included severe childhood emotional neglect (B = -13.34, p = 0.001), smoking crack daily (B = -5.42, p = 0.044), having been sexual assaulted (B =  14.42, p = 0.041), and blackout drinking (B = -6.19, p = 0.027). Young people in this study have faced multiple complex challenges to

  12. The impact of subsidence on straight and curved modular cementless revision stems in hip revision surgery.

    Science.gov (United States)

    Fraile Suari, A; Gil González, S; Pérez Prieto, D; León García, A; Mestre Cortadellas, C; Tey Pons, M; Marqués López, F

    Subsidence is one of the potential complications in femoral stem revision total hip arthroplasty surgery, and can affect stability and osseointegration. A retrospective study was conducted on the outcomes at one year and 5 years (specifically subsidence and clinical relevance) of 40 consecutive femoral total hip arthroplasty revisions, comparing two modular cementless revision stems, Straight vs. Curved, with 20 patients in each group. No mechanical failure was observed, and there was an improvement in functional outcomes. Mean radiological subsidence was 9.9±4.9mm (straight=10.75mm vs. curved=9.03mm), with no statistically significant difference between groups (p=0,076). Fourteen patients (35%) had ≥10mm of subsidence, up to a maximum of 22mm. The subsidence found in this study is similar to published series, with no short-term clinical manifestations, or an increased number of complications or stem loosening in either the Straight or Curved group. No differences in subsidence were observed at one year and 5 years after surgery between the 2 types of stems. Copyright © 2017 SECOT. Publicado por Elsevier España, S.L.U. All rights reserved.

  13. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  14. Customer Involvement in the Game Development Process

    Directory of Open Access Journals (Sweden)

    Kaja Prystupa-Rządca

    2015-01-01

    Full Text Available The creative industry is a fast developing sector of economy in many countries. Growing competition in this area has led many companies to implement strategy of users' involvement in product development in order to deliver products that are more aligned with customers’ needs. On the other hand, the attempt to align the customers’ expectations with artistic creativity may create tensions. Therefore, the aim of the research is to examine the methods of users’ involvement in product development and real impact of the users on project design. The obtained findings are based on two-year qualitative research project conducted in game development companies.

  15. EPR first responders revision test

    International Nuclear Information System (INIS)

    2011-01-01

    In this revision test evaluates the acquired knowledge in case of radiological emergency confront. Actions to be taken in relation to people, equipment and the environment. Doses, radioactive sources, pollution

  16. Mathematics Curriculum in Ireland: The Influence of PISA on the Development of Project Maths

    Science.gov (United States)

    Kirwan, Liz

    2015-01-01

    This article interrogates the extent to which the Organization for Economic Cooperation and Development (OECD) through its Programme for International Student Assessment (PISA) influenced the development of Project Maths, a new second-level mathematics education policy in Ireland. It argues that the Irish government, in its revision of mathematics…

  17. Peritoneal Dialysis Access Revision in Children: Causes, Interventions, and Outcomes.

    Science.gov (United States)

    Borzych-Duzalka, Dagmara; Aki, T Fazil; Azocar, Marta; White, Colin; Harvey, Elizabeth; Mir, Sevgi; Adragna, Marta; Serdaroglu, Erkin; Sinha, Rajiv; Samaille, Charlotte; Vanegas, Juan Jose; Kari, Jameela; Barbosa, Lorena; Bagga, Arvind; Galanti, Monica; Yavascan, Onder; Leozappa, Giovanna; Szczepanska, Maria; Vondrak, Karel; Tse, Kei-Chiu; Schaefer, Franz; Warady, Bradley A

    2017-01-06

    Little published information is available about access failure in children undergoing chronic peritoneal dialysis. Our objectives were to evaluate frequency, risk factors, interventions, and outcome of peritoneal dialysis access revision. Data were derived from 824 incident and 1629 prevalent patients from 105 pediatric nephrology centers enrolled in the International Pediatric Peritoneal Dialysis Network Registry between 2007 and 2015. In total, 452 access revisions were recorded in 321 (13%) of 2453 patients over 3134 patient-years of follow-up, resulting in an overall access revision rate of 0.14 per treatment year. Among 824 incident patients, 186 (22.6%) underwent 188 access revisions over 1066 patient-years, yielding an access revision rate of 0.17 per treatment year; 83% of access revisions in incident patients were reported within the first year of peritoneal dialysis treatment. Catheter survival rates in incident patients were 84%, 80%, 77%, and 73% at 12, 24, 36, and 48 months, respectively. By multivariate logistic regression analysis, risk of access revision was associated with younger age (odds ratio, 0.93; 95% confidence interval, 0.92 to 0.95; P<0.001), diagnosis of congenital anomalies of the kidney and urinary tract (odds ratio, 1.28; 95% confidence interval, 1.03 to 1.59; P=0.02), coexisting ostomies (odds ratio, 1.42; 95% confidence interval, 1.07 to 1.87; P=0.01), presence of swan neck tunnel with curled intraperitoneal portion (odds ratio, 1.30; 95% confidence interval, 1.04 to 1.63; P=0.02), and high gross national income (odds ratio, 1.10; 95% confidence interval, 1.02 to 1.19; P=0.01). Main reasons for access revisions included mechanical malfunction (60%), peritonitis (16%), exit site infection (12%), and leakage (6%). Need for access revision increased the risk of peritoneal dialysis technique failure or death (hazard ratio, 1.35; 95% confidence interval, 1.10 to 1.65; P=0.003). Access dysfunction due to mechanical causes doubled the risk

  18. Peritoneal Dialysis Access Revision in Children: Causes, Interventions, and Outcomes

    Science.gov (United States)

    Aki, T. Fazil; Azocar, Marta; White, Colin; Harvey, Elizabeth; Mir, Sevgi; Adragna, Marta; Serdaroglu, Erkin; Sinha, Rajiv; Samaille, Charlotte; Vanegas, Juan Jose; Kari, Jameela; Barbosa, Lorena; Bagga, Arvind; Galanti, Monica; Yavascan, Onder; Leozappa, Giovanna; Szczepanska, Maria; Vondrak, Karel; Tse, Kei-Chiu; Schaefer, Franz; Warady, Bradley A.

    2017-01-01

    Background and objectives Little published information is available about access failure in children undergoing chronic peritoneal dialysis. Our objectives were to evaluate frequency, risk factors, interventions, and outcome of peritoneal dialysis access revision. Design, setting, participants, & measurements Data were derived from 824 incident and 1629 prevalent patients from 105 pediatric nephrology centers enrolled in the International Pediatric Peritoneal Dialysis Network Registry between 2007 and 2015. Results In total, 452 access revisions were recorded in 321 (13%) of 2453 patients over 3134 patient-years of follow-up, resulting in an overall access revision rate of 0.14 per treatment year. Among 824 incident patients, 186 (22.6%) underwent 188 access revisions over 1066 patient-years, yielding an access revision rate of 0.17 per treatment year; 83% of access revisions in incident patients were reported within the first year of peritoneal dialysis treatment. Catheter survival rates in incident patients were 84%, 80%, 77%, and 73% at 12, 24, 36, and 48 months, respectively. By multivariate logistic regression analysis, risk of access revision was associated with younger age (odds ratio, 0.93; 95% confidence interval, 0.92 to 0.95; P<0.001), diagnosis of congenital anomalies of the kidney and urinary tract (odds ratio, 1.28; 95% confidence interval, 1.03 to 1.59; P=0.02), coexisting ostomies (odds ratio, 1.42; 95% confidence interval, 1.07 to 1.87; P=0.01), presence of swan neck tunnel with curled intraperitoneal portion (odds ratio, 1.30; 95% confidence interval, 1.04 to 1.63; P=0.02), and high gross national income (odds ratio, 1.10; 95% confidence interval, 1.02 to 1.19; P=0.01). Main reasons for access revisions included mechanical malfunction (60%), peritonitis (16%), exit site infection (12%), and leakage (6%). Need for access revision increased the risk of peritoneal dialysis technique failure or death (hazard ratio, 1.35; 95% confidence interval, 1

  19. The outlook for natural gas markets in the GRI baseline projection

    International Nuclear Information System (INIS)

    Holtberg, P.D.

    1990-01-01

    Gas Research Institute is an independent, not-for-profit organization that plans, manages, and develops financing for a cooperative research and development program for the mutual benefit of the natural gas industry and its customers. The research program consists of over 500 active research projects in natural gas supply and end use, and in gas industry operations, as well as related basic research. This paper summarizes the U.S. natural gas demand and supply outlook projected in a preliminary version of the 191 edition of the GRI Baseline Projection of U.S. Energy Supply and Demand. The projection used for this paper is from an early run of the GRI modeling structure. As such, it is subject to substantial revision before the Baseline Projection is finalized. The paper presents a projection of natural gas demand in the major end-use sectors and the slate of supply sources expected to meet that demand over the period from 1989 to 2010

  20. Phase unwrapping algorithm based on multi-frequency fringe projection and fringe background for fringe projection profilometry

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Gu, Feifei; Ma, Yueyang

    2015-01-01

    A phase unwrapping algorithm specially designed for the phase-shifting fringe projection profilometry (FPP) is proposed. It combines a revised dual-frequency fringe projectionalgorithm and a proposed fringe background based quality guided phase unwrapping algorithm (FB-QGPUA). Phase demodulated from the high-frequency fringe patterns is partially unwrapped by that demodulated from the low-frequency ones. Then FB-QGPUA is adopted to further unwrap the partially unwrapped phase. Influences of the phase error on the measurement are researched. Strategy to select the fringe pitch is given. Experiments demonstrate that the proposed method is very robust and efficient. (paper)

  1. Resource description and access 2013 revision

    CERN Document Server

    2013-01-01

    This e-book contains the 2013 Revision of RDA: Resource Description and Access, and includes the July 2013 Update. This e-book offers links within the RDA text and the capability of running rudimentary searches of RDA, but please note that this e-book does not have the full range of content or functionality provided by the subscription product RDA Toolkit. Included: A full accumulation of RDA- the revision contains a full set of all current RDA instructions. It replaces the previous version of RDA Print as opposed to being an update packet to that version. RDA has gone through many changes sin

  2. International Regional Patterns of R&D Networks Involving Low Tech SMEs

    Directory of Open Access Journals (Sweden)

    Aurora A.C. Teixeira

    2013-03-01

    Full Text Available A large number of studies have emphasized the spatial proximity of economic activity and its relation to the spatiality of knowledge creation in various types of connections. Far less attention has been paid to the understanding of the determinants of ‘cultural’ and geographical proximity in international R&D cooperation projects involving SMEs and the role of the quality of the Regional Innovation System (RIS. Using a database of completed European Cooperative Research projects, we conclude that: 1 technologically more complex projects are more likely to involve ‘culturally’ and geographically distant partners; 2 RIS related variables determine ‘cultural’ proximity but not geographical proximity; 3 at first sight surprisingly, international cooperation projects involving the 1st promoters of innovation-led regions (high patent propensity and high human capital levels are culturally more distant.

  3. Risk factors for revision of primary total hip arthroplasty: a systematic review

    Directory of Open Access Journals (Sweden)

    Prokopetz Julian JZ

    2012-12-01

    Full Text Available Abstract Background Numerous papers have been published examining risk factors for revision of primary total hip arthroplasty (THA, but there have been no comprehensive systematic literature reviews that summarize the most recent findings across a broad range of potential predictors. Methods We performed a PubMed search for papers published between January, 2000 and November, 2010 that provided data on risk factors for revision of primary THA. We collected data on revision for any reason, as well as on revision for aseptic loosening, infection, or dislocation. For each risk factor that was examined in at least three papers, we summarize the number and direction of statistically significant associations reported. Results Eighty-six papers were included in our review. Factors found to be associated with revision included younger age, greater comorbidity, a diagnosis of avascular necrosis (AVN as compared to osteoarthritis (OA, low surgeon volume, and larger femoral head size. Male sex was associated with revision due to aseptic loosening and infection. Longer operating time was associated with revision due to infection. Smaller femoral head size was associated with revision due to dislocation. Conclusions This systematic review of literature published between 2000 and 2010 identified a range of demographic, clinical, surgical, implant, and provider variables associated with the risk of revision following primary THA. These findings can inform discussions between surgeons and patients relating to the risks and benefits of undergoing total hip arthroplasty.

  4. Perioperative transfusion threshold and ambulation after hip revision surgery

    DEFF Research Database (Denmark)

    Nielsen, Kamilla; Johansson, Pär I; Dahl, Benny

    2014-01-01

    BACKGROUND: Transfusion with red blood cells (RBC) may be needed during hip revision surgery but the appropriate haemoglobin concentration (Hb) threshold for transfusion has not been well established. We hypothesized that a higher transfusion threshold would improve ambulation after hip revision...... surgery. METHODS: The trial was registered at Clinicaltrials.gov ( NCT00906295). Sixty-six patients aged 18 years or older undergoing hip revision surgery were randomized to receive RBC at a Hb threshold of either 7.3 g/dL (restrictive group) or 8.9 g/dL (liberal group). Postoperative ambulation...... received RBC. CONCLUSIONS: A Hb transfusion threshold of 8.9 g/dL was associated with a statistically significantly faster TUG after hip revision surgery compared to a threshold of 7.3 g/dL but the clinical importance is questionable and the groups did not differ in Hb at the time of testing....

  5. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  6. EPRI PWR primary water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Fruzzetti, Keith

    2014-01-01

    EPRI periodically updates the PWR Primary Water Chemistry Guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). The last revision of the PWR water chemistry guidelines identified an optimum primary water chemistry program based on then-current understanding of research and field information. This new revision provides further details with regard to primary water stress corrosion cracking (PWSCC), fuel integrity, and shutdown dose rates. A committee of industry experts, including utility specialists, nuclear steam supply system (NSSS) and fuel vendor representatives, Institute of Nuclear Power Operations (INPO) representatives, consultants, and EPRI staff collaborated in reviewing the available data on primary water chemistry, reactor water coolant system materials issues, fuel integrity and performance issues, and radiation dose rate issues. From the data, the committee updated the water chemistry guidelines that all PWR nuclear plants should adopt. The committee revised guidance with regard to optimization to reflect industry experience gained since the publication of Revision 6. Among the changes, the technical information regarding the impact of zinc injection on PWSCC initiation and dose rate reduction has been updated to reflect the current level of knowledge within the industry. Similarly, industry experience with elevated lithium concentrations with regard to fuel performance and radiation dose rates has been updated to reflect data collected to date. Recognizing that each nuclear plant owner has a unique set of design, operating, and corporate concerns, the guidelines committee has retained a method for plant-specific optimization. Revision 7 of the Pressurized Water Reactor Primary Water Chemistry Guidelines provides guidance for PWR primary systems of all manufacture and design. The guidelines continue to emphasize plant

  7. New Mandates and Imperatives in the Revised "ACA Code of Ethics"

    Science.gov (United States)

    Kaplan, David M.; Kocet, Michael M.; Cottone, R. Rocco; Glosoff, Harriet L.; Miranti, Judith G.; Moll, E. Christine; Bloom, John W.; Bringaze, Tammy B.; Herlihy, Barbara; Lee, Courtland C.; Tarvydas, Vilia M.

    2009-01-01

    The first major revision of the "ACA Code of Ethics" in a decade occurred in late 2005, with the updated edition containing important new mandates and imperatives. This article provides interviews with members of the Ethics Revision Task Force that flesh out seminal changes in the revised "ACA Code of Ethics" in the areas of confidentiality,…

  8. Cost Implications of Primary Versus Revision Surgery in Adult Spinal Deformity.

    Science.gov (United States)

    Qureshi, Rabia; Puvanesarajah, Varun; Jain, Amit; Kebaish, Khaled; Shimer, Adam; Shen, Francis; Hassanzadeh, Hamid

    2017-08-01

    Adult spinal deformity (ASD) is an important problem to consider in the elderly. Although studies have examined the complications of ASD surgery and have compared functional and radiographic results of primary surgery versus revision, no studies have compared the costs of primary procedures with revisions. We assessed the in-hospital costs of these 2 surgery types in patients with ASD. The PearlDiver Database, a database of Medicare records, was used in this study. Mutually exclusive groups of patients undergoing primary or revision surgery were identified. Patients in each group were queried for age, sex, and comorbidities. Thirty-day readmission rates, 30-day and 90-day complication rates, and postoperative costs of care were assessed with multivariate analysis. For analyses, significance was set at P average reimbursement of the primary surgery cohort was $57,078 ± $30,767. Reimbursement of revision surgery cohort was $52,999 ± $27,658. The adjusted difference in average costs between the 2 groups is $4773 ± $1069 (P day and 90-day adjusted difference in cost of care when sustaining any of the major medical complications in primary surgery versus revision surgery was insignificant. Patients undergoing primary and revision corrective procedures for ASD have similar readmission rates, lengths of stays, and complication rates. Our data showed a higher cost of primary surgery compared with revision surgery, although costs of sustaining postoperative complications were similar. This finding supports the decision to perform revision procedures in patients with ASD when indicated because neither outcomes nor costs are a hindrance to correction. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. Benchmarking and validation activities within JEFF project

    Directory of Open Access Journals (Sweden)

    Cabellos O.

    2017-01-01

    Full Text Available The challenge for any nuclear data evaluation project is to periodically release a revised, fully consistent and complete library, with all needed data and covariances, and ensure that it is robust and reliable for a variety of applications. Within an evaluation effort, benchmarking activities play an important role in validating proposed libraries. The Joint Evaluated Fission and Fusion (JEFF Project aims to provide such a nuclear data library, and thus, requires a coherent and efficient benchmarking process. The aim of this paper is to present the activities carried out by the new JEFF Benchmarking and Validation Working Group, and to describe the role of the NEA Data Bank in this context. The paper will also review the status of preliminary benchmarking for the next JEFF-3.3 candidate cross-section files.

  10. Benchmarking and validation activities within JEFF project

    Science.gov (United States)

    Cabellos, O.; Alvarez-Velarde, F.; Angelone, M.; Diez, C. J.; Dyrda, J.; Fiorito, L.; Fischer, U.; Fleming, M.; Haeck, W.; Hill, I.; Ichou, R.; Kim, D. H.; Klix, A.; Kodeli, I.; Leconte, P.; Michel-Sendis, F.; Nunnenmann, E.; Pecchia, M.; Peneliau, Y.; Plompen, A.; Rochman, D.; Romojaro, P.; Stankovskiy, A.; Sublet, J. Ch.; Tamagno, P.; Marck, S. van der

    2017-09-01

    The challenge for any nuclear data evaluation project is to periodically release a revised, fully consistent and complete library, with all needed data and covariances, and ensure that it is robust and reliable for a variety of applications. Within an evaluation effort, benchmarking activities play an important role in validating proposed libraries. The Joint Evaluated Fission and Fusion (JEFF) Project aims to provide such a nuclear data library, and thus, requires a coherent and efficient benchmarking process. The aim of this paper is to present the activities carried out by the new JEFF Benchmarking and Validation Working Group, and to describe the role of the NEA Data Bank in this context. The paper will also review the status of preliminary benchmarking for the next JEFF-3.3 candidate cross-section files.

  11. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  12. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  13. 76 FR 1440 - Notice of Revised Child Outcomes Framework

    Science.gov (United States)

    2011-01-10

    ... Outcomes Framework, renamed The Head Start Child Development and Learning Framework: Promoting Positive Outcomes in Early Childhood Programs Serving Children 3-5 Years Old. The Framework was revised to give more... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Notice of Revised...

  14. Involving Employees in Strategy innovation

    DEFF Research Database (Denmark)

    Friis, Ole Uhrskov; Koch, Christian

    2011-01-01

    Strategy as a practice and continuous innovation approaches are combined to conceptualise dilemmas of short versus long term and to analyse a case of employee participation as a particular example of strategy innovation. The case is a medium size textile company developing its strategy involving ...... and Balanced Score Card consultancy, an ‘open space’ workshop and organized strategy projects. Especially the latter two are important in facilitating the employee involvement. The case however also exhibit enterprise situated praxis’s like mitigation of taboos....

  15. Parental Involvement in Children's Education : A Gendered Perspective

    OpenAIRE

    Stanikzai, Razia

    2013-01-01

    The importance of parental involvement as an enabling factor in children’s education is well evidenced. Teachers have a critical role in facilitating or hindering parents’ involvement in their children’s learning. The research project provides an analysis of what teachers view as parents’ role in their children’s education with an emphasis on gender-differentiated involvement. It also discusses the barriers to parents’ involvement as well as explores whether teachers understand the importance...

  16. INDIRECT WRITTEN CORRECTIVE FEEDBACK, REVISION, AND LEARNING

    Directory of Open Access Journals (Sweden)

    Fatemeh Poorebrahim

    2017-01-01

    Full Text Available Corrective feedback, the necessity of providing it, and how it should be provided has been one of the hot topics in the area of ELT. Amid continuing controversies over whether providing feedback helps L2 learners improve their writing accuracy, many research studies have been undertaken to compare the relative effectiveness of different types of feedback. However, the difference between two types of indirect corrective feedback, namely indication and indication plus location, have not been properly examined yet. Motivated to narrow this gap, this study is designed to compare two groups of Iranian learners, each revising their papers based on one of the aforementioned options. For data analysis, a series of independent samples t tests were employed. The results revealed that the difference between the two groups in their reduction of errors from the original draft to the revision of each task followed a growing trend and became significant. Nonetheless, the difference in accuracy of new pieces of writing fell short of significance. Finally, it was found that error reduction in revision stage cannot be considered as learning. The results of the study, discussed in relation to that of others, implicate that the purpose for which feedback is provided is essential in determining the type of feedback; more explicit feedback is better for revising purposes while more implicit feedback is good for learning purposes.

  17. Entertainment-education and recruitment of cornea donors: the role of emotion and issue involvement.

    Science.gov (United States)

    Bae, Hyuhn-Suhck

    2008-01-01

    This study examined the role of emotional responses and viewer's level of issue involvement to an entertainment-education show about cornea donation in order to predict intention to register as cornea donors. Results confirmed that sympathy and empathy responses operated as a catalyst for issue involvement, which emerged as an important intermediary in the persuasion process. Issue involvement also was found to be a common causal antecedent of attitude, subjective norm, and perceived behavioral control, the last two of which predict intentions unlike attitude, which does not. The revised path model confirmed that involvement directly influences intention. The findings of this study suggest that adding emotion and involvement in the Theory of Planned Behavior (TPB) enhances the explanatory power of the theory in predicting intentions, which indicates the possibility of combining the Elaboration Likelihood Model (ELM) and the TPB in the prediction of human behaviors.

  18. Methodology for the selection of routes for international cross-border line projects involving multiple objectives and decision-makers in the analyses of restrictions and environmental possibilities

    International Nuclear Information System (INIS)

    Angel S, Enrique; Cadena, Luis Fernando

    2005-01-01

    A scheme was developed and applied to select the optimum environmental route for international cross-border line projects, in a decision making context involving multiple objectives and multiple decision-makers, the project studied was the electricity interconnection for central America (SIEPAC) for which a prospective assessment was carried out regarding the restrictions and possibilities in the light of the Colombian environmental dimensions management model. The methodology proposed followed these stages: Definition and approval of the structure of environmental restriction and criticality variables, sectorization and selection of complex sections, definition of decision-makers for multi-objective analysis; design and application of consultation tool; definition and modeling of options applying SIG; sensitivity analysis of alternative routes and project's environment management. Different options were identified for insertion and permanence of the project according to the criteria of various interest groups and actors consulted: environmental authorities, electricity companies, scientific community and civil society

  19. Revision Hip Arthroscopy: A Systematic Review of Diagnoses, Operative Findings, and Outcomes.

    Science.gov (United States)

    Cvetanovich, Gregory L; Harris, Joshua D; Erickson, Brandon J; Bach, Bernard R; Bush-Joseph, Charles A; Nho, Shane J

    2015-07-01

    To determine indications for, operative findings of, and outcomes of revision hip arthroscopy. A systematic review was registered with PROSPERO and performed based on PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) guidelines. Therapeutic clinical outcome studies reporting the indications for, operative findings of, and outcomes of revision hip arthroscopy were eligible for inclusion. All study-, patient-, and hip-specific data were extracted and analyzed. The Modified Coleman Methodology Score was used to assess study quality. Five studies were included (348 revision hip arthroscopies; 333 patients; mean age, 31.4 ± 4.2 years; 60% female patients). All 5 studies were either Level III or IV evidence. The surgeon performing revision hip arthroscopy was the same as the primary hip surgeon in only 25% of cases. The mean time between primary and revision hip arthroscopy was 27.8 ± 7.0 months (range, 2 to 193 months). Residual femoroacetabular impingement was the most common indication for and operative finding of revision hip arthroscopy (81% of cases). The most commonly reported revision procedures were femoral osteochondroplasty (24%) and acetabuloplasty (18%). The modified Harris Hip Score was used in all 5 analyzed studies, with significant (P arthroscopy, subsequent reported operations were hip arthroplasty in 11 patients and re-revision hip arthroscopy in 8 patients (5% total reoperation rate). Revision hip arthroscopy is most commonly performed for residual femoroacetabular impingement, with statistically significant and clinically relevant improvements shown in multiple patient-reported clinical outcome scores at short-term follow-up. The reoperation rate after revision hip arthroscopy is 5% within 2 years, including further arthroscopy or conversion to hip arthroplasty. Level IV, systematic review of Level III and IV studies. Copyright © 2015 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  20. Corporate Author Entries. Revision 5

    International Nuclear Information System (INIS)

    Hendricks, P.L.

    1986-05-01

    This reference authority has been created and is maintained to provide standard forms for recording the names of organizations consistently in bibliographic citations. This revision includes approximately 42,000 entries established since 1973