WorldWideScience

Sample records for project information systems

  1. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  2. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  3. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  4. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  5. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  6. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  7. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  8. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  9. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  10. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  11. IAEA safeguards information system re-engineering project (IRP)

    International Nuclear Information System (INIS)

    Whitaker, G.; Becar, J.-M.; Ifyland, N.; Kirkgoeze, R.; Koevesd, G.; Szamosi, L.

    2007-01-01

    The Safeguards Information System Re-engineering Project (IRP) was initiated to assist the IAEA in addressing current and future verification and analysis activities through the establishment of a new information technology framework for strengthened and integrated safeguards. The Project provides a unique opportunity to enhance all of the information services for the Department of Safeguards and will require project management 'best practices' to balance limited funds, available resources and Departmental priorities. To achieve its goals, the Project will require the participation of all stakeholders to create a comprehensive and cohesive plan that provides both a flexible and stable foundation for address changing business needs. The expectation is that high quality integrated information systems will be developed that incorporate state-of-the-art technical architectural standards, improved business processes and consistent user interfaces to store various data types in an enterprise data repository which is accessible on-line in a secure environment. (author)

  12. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  13. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  14. Project Management Information System: the Role and the Issues of Implementation

    Directory of Open Access Journals (Sweden)

    Dumitru OPREA

    2006-01-01

    Full Text Available We are coping more and more with the project and project management in day by day life. Even if some activities are the similarly with common organization actions, the life cycle project activities request more information and more actions. So it is necessary to have some tools, methods and rules to manage a large amount of information which must be disseminated to numerous stakeholders. This need could be solved by project management information systems (PMIS. PMIS is a complex one, with various components which are depending on type of project, type of organization etc. The latest evolution of information and communication technology was favorable to our research field. Therefore, there are different tools to support the structure, automation and efficiency of PMIS. Moreover from several years it is spread the following notions: web-based project management, project management office, enterprise project management. So, we can see the fast evolution of this field. But, our paper will bring general ideas relating to project management information systems, like definition of PMIS, the project life cycle and the information needed of each stage, various tools to support the PMIS procedures. The characteristics, tools, trends will be our future research.

  15. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  16. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  17. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  18. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  19. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  20. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  1. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  2. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Schillinger, Wolfgang; Weidemann, Rainer

    2016-01-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  3. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  4. The Middle Eastern Regional Irrigation Management Information Systems project-update

    Science.gov (United States)

    The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...

  5. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  6. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  7. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  8. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  9. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  10. Architecture and Functionality of the Advanced Life Support On-Line Project Information System

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriguez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Ames Research Center (ARC) to develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a Web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an research and technology development (R&TD) status information hub that can potentially serve as the primary annual reporting mechanism for ALS-funded projects. Using OPIS, ALS managers and element leads will be able to carry out informed R&TD investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, Controls and Systems Analysis). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  11. Development of a website and an information system for an European R&D project : the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2003-01-01

    Full Text Available The multidisciplinary nature, the international partnership and the large amount of information to be managed in an European project such as STRATFEED, require the development of an information management system. Within the framework of this project, the development of the Internet-oriented computer system required three facets: the data and information collection, the database building and the development of different applications. A tool for the dissemination of results (STRATFEED website with both a public part and a confidential part, a tool for data management (STRATFEED manager, a tool for data queries (STRATFEED explorer and two tools for decision-making (ARIES Decision Support System –– CD-Rom release and STRATFEED Decision Support System – Internet release were developed. The modular concept, which relates to the different topics of the project, facilitates the updating and development of a system according to research progress and user needs. The concept developed for this project can be used for any other project and can easily be adapted to meet new requirements. The example of the STRATFEED project can be accessed at: http://stratfeed.cra.wallonie.be

  12. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  13. PROJECT MANAGEMENT INFORMATION SYSTEM: STUDY IN SMALL AND MEDIUM ENTERPRISES OF INDUSTRIAL AUTOMATION

    Directory of Open Access Journals (Sweden)

    Paulo Eduardo Mondin

    2016-12-01

    Full Text Available This article aims to analyze the structuring stage and use of information systems in project management in small and medium-sized companies in the business of providing services in industrial automation. Information systems applied to project management - SIGPs can contribute to decision-making on projects, assisting in the management of reliable information in real time, making it a natural choice for most companies looking to increase performance management of their projects. The research method used was multiple case study, in line with the explanatory nature of the study, when to investigate and perform analytical comparisons on how small and medium-sized enterprises of the studied branch structure and use the SIGPs, considering the contemporary character theme and the possibility of direct observation of the object of study, in addition to conducting interviews. The main results were identified the main gaps in project management in companies and research as the management characteristics of these SMEs have influence in how their projects are managed. It was observed that there is a predominance of features involving scope, time and resources on projects, whereas aspects related to costs, risks, quality, procurement and communications have unimpressive results in relation to structuring.

  14. Information System Development: Can Traditional Project Management Tools Be Successful in Post-Industrial Organizations?

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2002-01-01

    Literature on project management of information systems development suggests practices based on success stories in industrial organizations. Recent trends towards post-industrial organizational forms and loosely coupled networked organizations raise questions regarding the applicability of these ...... of information systems development projects in post-industrial organizations. The guidelines are both the result of post-rationalization of the team members and of the case analysis....

  15. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  16. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  17. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  18. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  19. An Empirical Examination of Factors Affecting Group Effectiveness in Information Systems Projects

    Science.gov (United States)

    Hasan, Bassam; Ali, Jafar

    2007-01-01

    Although group project concepts and skills have become a major component in most information systems (IS) academic programs, very little research has attempted to examine factors that may improve or undermine effectiveness of IS group projects. Accordingly, based on relevant literatures, this study develops and empirically tests a model of factors…

  20. Metaphors in Managerial and Employee Sensemaking in an Information Systems Project

    DEFF Research Database (Denmark)

    Hekkala, Riitta; Stein, Mari-Klara; Rossi, Matti

    2018-01-01

    This longitudinal study looks at the metaphors used in a public sector information systems development project from the perspective of cognitive metaphor theory (Lakoff & Johnson,). We examine the use of metaphors by project team members, including representatives of the users, software developers......-intensive situations, metaphor use with unclear intentions and purpose hinders learning and creates more chaos than order. From a practical perspective, our study highlights the relevance of metaphor use for project management. We suggest that intentional selection of metaphors by management could be beneficial...

  1. Geographic information system development in the CARETS project

    Science.gov (United States)

    Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.

    1977-01-01

    Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.

  2. GRIN-Global: An International Project to Develop a Global Plant Genebank Information Management System

    Science.gov (United States)

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...

  3. Investments in information systems and technology in the healthcare: Project management mediation

    Directory of Open Access Journals (Sweden)

    Jorge Gomes

    2017-03-01

    Full Text Available Healthcare organisations must improve their business practices and internal procedures in order to answer the increasing demand of health professionals and the general public for more and better information. Hospitals invest massively in information systems and technology (IS/IT in the hope that these investments will improve healthcare and meet patients’ demands. The main objective of our research is to study how organisational maturity, enhanced by investments in IS/IT, project management and best practices, leads to successful projects in public healthcare organisations. The rational of our model is that organisational maturity has a positive effect on IS/IT project success, and that this success is also positively enhanced by the use of project management practices. We emphasise that this combination of approaches can increase the effectiveness of projects. Furthermore, it can also improve the confidence that the results of investments will meet stakeholders’ expectations.

  4. GlobePort Faces Global Business Challenges--Assessing the Organizational Side of Information Systems Projects

    Science.gov (United States)

    Ghosh, Biswadip

    2011-01-01

    Published studies have reported that Information System (IS) projects succeed or fail based on how effectively the organizational issues were understood and addressed in the specification, development and implementation stages of the project. This is particularly true in the design and delivery of Inter-Organizational Systems (IOS) that can affect…

  5. Deaf Effect for Risk Warnings: A Causal Examination applied to Information Systems Projects

    NARCIS (Netherlands)

    A.L.P. Nuijten (Arno)

    2012-01-01

    textabstractEscalation of commitment to a chosen course of action is a phenomenon that shows for example when failing strategic Information Systems (IS) projects are continued for much too long. With this study we contribute to the explanation of why managers (Project Owners) respond with the Deaf

  6. Development Approach of the Advanced Life Support On-line Project Information System

    Science.gov (United States)

    Levri, Julie A.; Hogan, John A.; Morrow, Rich; Ho, Michael C.; Kaehms, Bob; Cavazzoni, Jim; Brodbeck, Christina A.; Whitaker, Dawn R.

    2005-01-01

    The Advanced Life Support (ALS) Program has recently accelerated an effort to develop an On-line Project Information System (OPIS) for research project and technology development data centralization and sharing. There has been significant advancement in the On-line Project Information System (OPIS) over the past year (Hogan et al, 2004). This paper presents the resultant OPIS development approach. OPIS is being built as an application framework consisting of an uderlying Linux/Apache/MySQL/PHP (LAMP) stack, and supporting class libraries that provides database abstraction and automatic code generation, simplifying the ongoing development and maintenance process. Such a development approach allows for quick adaptation to serve multiple Programs, although initial deployment is for an ALS module. OPIS core functionality will involve a Web-based annual solicitation of project and technology data directly from ALS Principal Investigators (PIs) through customized data collection forms. Data provided by PIs will be reviewed by a Technical Task Monitor (TTM) before posting the information to OPIS for ALS Community viewing via the Web. Such Annual Reports will be permanent, citable references within OPIS. OPlS core functionality will also include Project Home Sites, which will allow PIS to provide updated technology information to the Community in between Annual Report updates. All data will be stored in an object-oriented relational database, created in MySQL(Reistered Trademark) and located on a secure server at NASA Ames Research Center (ARC). Upon launch, OPlS can be utilized by Managers to identify research and technology development (R&TD) gaps and to assess task performance. Analysts can employ OPlS to obtain the current, comprehensive, accurate information about advanced technologies that is required to perform trade studies of various life support system options. ALS researchers and technology developers can use OPlS to achieve an improved understanding of the NASA

  7. Creating Business Value through Agile Project Management and Information Systems Development

    DEFF Research Database (Denmark)

    Kautz, Karlheinz; Johansen, Thomas Heide; Uldahl, Andreas

    2014-01-01

    Value creation through information systems (IS) and information technology (IT) is a major IS research topic. However there still exists an ambiguity and fuzziness of the ‘IS business value’ concept and a lack of clarity surrounding the value creation process. This also true for organizations...... that develop IS/IT and for development technologies like information systems development and project management methods that are applied in the production of IS/IT. The agile method Scrum is one such technology. In the research presented here we studied productivity, quality and employee satisfaction...... with some of the deficiencies in current IS business value research and contribute to filling existing gaps in an IS business value research agenda....

  8. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  9. Architecture and Functionality of the Advanced Life Support On-Line Project Information System (OPIS)

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriquez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Amcs Research Center (ARC) tu develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL(Trademark) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an R&TD status information hub that can potentially serve as the primary annual reporting mechanism. Using OPIS, ALS managers and element leads will be able to carry out informed research and technology development investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, and Control). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  10. Witwatersrand Water Ingress Project - Information Management System (WWIPIMS), South Africa

    Energy Technology Data Exchange (ETDEWEB)

    Hild, S.; Sieste, M.; Barth, A.; Rudinskaya, J. [Beak Consultants GmbH, Freiberg (Germany); Croukamp, L.; Roos, M. [Council for Geoscience (CGS), Pretoria (South Africa)

    2006-07-01

    The Witwatersrand Water Ingress Project at the Council for Geoscience, South Africa (CGS) deals with an inventory, a risk assessment and the development of rehabilitation strategies for abandoned mining sites in the Witwatersrand Mining Basin. The main focus is the prevention of water ingress and to understand the future decanting scenario. An Information Management System consisting of both a relational database and an application for the Witwatersrand Water Ingress Project is established for accessing and managing all project-related data. This easy to use application makes the data available to all staff at the CGS via several modules as well as a GIS-component for accessing and querying spatial data. This will enable the scientists to derive further knowledge of the water flowing processes by directly using all of the existing up-to-date data. Many additional functions, such as the support for map printing on demand, extensive possibilities for inquiries, data import and export, diagrams and a GIS-viewer for spatial inquiries do complete the system. (orig.)

  11. A highly scalable information system as extendable framework solution for medical R&D projects.

    Science.gov (United States)

    Holzmüller-Laue, Silke; Göde, Bernd; Stoll, Regina; Thurow, Kerstin

    2009-01-01

    For research projects in preventive medicine a flexible information management is needed that offers a free planning and documentation of project specific examinations. The system should allow a simple, preferably automated data acquisition from several distributed sources (e.g., mobile sensors, stationary diagnostic systems, questionnaires, manual inputs) as well as an effective data management, data use and analysis. An information system fulfilling these requirements has been developed at the Center for Life Science Automation (celisca). This system combines data of multiple investigations and multiple devices and displays them on a single screen. The integration of mobile sensor systems for comfortable, location-independent capture of time-based physiological parameter and the possibility of observation of these measurements directly by this system allow new scenarios. The web-based information system presented in this paper is configurable by user interfaces. It covers medical process descriptions, operative process data visualizations, a user-friendly process data processing, modern online interfaces (data bases, web services, XML) as well as a comfortable support of extended data analysis with third-party applications.

  12. The Eruption Forecasting Information System (EFIS) database project

    Science.gov (United States)

    Ogburn, Sarah; Harpel, Chris; Pesicek, Jeremy; Wellik, Jay; Pallister, John; Wright, Heather

    2016-04-01

    The Eruption Forecasting Information System (EFIS) project is a new initiative of the U.S. Geological Survey-USAID Volcano Disaster Assistance Program (VDAP) with the goal of enhancing VDAP's ability to forecast the outcome of volcanic unrest. The EFIS project seeks to: (1) Move away from relying on the collective memory to probability estimation using databases (2) Create databases useful for pattern recognition and for answering common VDAP questions; e.g. how commonly does unrest lead to eruption? how commonly do phreatic eruptions portend magmatic eruptions and what is the range of antecedence times? (3) Create generic probabilistic event trees using global data for different volcano 'types' (4) Create background, volcano-specific, probabilistic event trees for frequently active or particularly hazardous volcanoes in advance of a crisis (5) Quantify and communicate uncertainty in probabilities A major component of the project is the global EFIS relational database, which contains multiple modules designed to aid in the construction of probabilistic event trees and to answer common questions that arise during volcanic crises. The primary module contains chronologies of volcanic unrest, including the timing of phreatic eruptions, column heights, eruptive products, etc. and will be initially populated using chronicles of eruptive activity from Alaskan volcanic eruptions in the GeoDIVA database (Cameron et al. 2013). This database module allows us to query across other global databases such as the WOVOdat database of monitoring data and the Smithsonian Institution's Global Volcanism Program (GVP) database of eruptive histories and volcano information. The EFIS database is in the early stages of development and population; thus, this contribution also serves as a request for feedback from the community.

  13. Management system information of characterization of the dismantling project of Jose Cabrera

    International Nuclear Information System (INIS)

    Gimeno Blesa, M. E.; Martin Palomo, N.; Gomez Rodriguez, C. A.

    2011-01-01

    In the proposed dismantling and decommissioning of the Jose Cabrera NPP is designed and implemented a database of physical and radiological inventory, which provides a powerful tool to optimize the storage, monitoring and control of the characterization data. The database is a useful and reliable management system characterization information that facilitates access and information processing, and ensures their integrity and traceability along of the dismantling project.

  14. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  15. Project Management Effectiveness: the choice - formal or informal controls

    Directory of Open Access Journals (Sweden)

    Jon Heales

    2007-12-01

    Full Text Available Development failures and runaway projects in the information systems (IS area can result in substantial losses to organizations, either financially or to a company’s reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.

  16. Change management in information systems projects for public organizations

    Directory of Open Access Journals (Sweden)

    Ewa Ziemba

    2015-08-01

    Full Text Available It can be argued that public organizations, in order to provide the public with sufficient services in the current, highly competitive and continuously evolving environment, require changes. The changes that become necessary are often related to the implementation of information systems (IS. Moreover, when organizations are faced with changes, a change management (CM process needs to be put in place. CM theories that are currently available to practitioners and academics are often contradictory; they mostly lack empirical evidence and are supported by unchallenged hypotheses concerning the nature of the contemporary CM. The aim of this paper is, therefore, to identify critical success factors (CFSs for CM in IS projects. In order to reach this aim an explanation of changes in public organizations and the nature of CM are presented. Following this, a framework of CFSs for CM in IS projects are identified based on the literature review. The paper also examines two IS projects and uses them to demonstrate CFSs influencing CM in IS projects in Polish pubic organizations. A discussion of the research findings is provided and the paper concludes with a presentation of the study’s contributions and limitations as well as the stream of future work.

  17. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  18. Majoring in Information Systems: Reasons Why Students Select (or Not) Information Systems as a Major

    Science.gov (United States)

    Snyder, Johnny; Slauson, Gayla Jo

    2014-01-01

    Filling the pipeline for information systems workers is critical in the information era. Projected growth rates for jobs requiring information systems expertise are significantly higher than the projected growth rates for other jobs. Why then do relatively few students choose to major in information systems? This paper reviews survey results from…

  19. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  20. Z-Plant material information tracking system (ZMITS) software development and integration project management plan

    International Nuclear Information System (INIS)

    IBSEN, T.G.

    1999-01-01

    This document plans for software and interface development governing the implementation of ZMITS and other supporting systems necessary to manage information for material stabilization needs of the Project Hanford Management Contract (PHMC)

  1. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  2. Privacy impact assessment in the design of transnational public health information systems: the BIRO project.

    Science.gov (United States)

    Di Iorio, C T; Carinci, F; Azzopardi, J; Baglioni, V; Beck, P; Cunningham, S; Evripidou, A; Leese, G; Loevaas, K F; Olympios, G; Federici, M Orsini; Pruna, S; Palladino, P; Skeie, S; Taverner, P; Traynor, V; Benedetti, M Massi

    2009-12-01

    To foster the development of a privacy-protective, sustainable cross-border information system in the framework of a European public health project. A targeted privacy impact assessment was implemented to identify the best architecture for a European information system for diabetes directly tapping into clinical registries. Four steps were used to provide input to software designers and developers: a structured literature search, analysis of data flow scenarios or options, creation of an ad hoc questionnaire and conduction of a Delphi procedure. The literature search identified a core set of relevant papers on privacy (n = 11). Technicians envisaged three candidate system architectures, with associated data flows, to source an information flow questionnaire that was submitted to the Delphi panel for the selection of the best architecture. A detailed scheme envisaging an "aggregation by group of patients" was finally chosen, based upon the exchange of finely tuned summary tables. Public health information systems should be carefully engineered only after a clear strategy for privacy protection has been planned, to avoid breaching current regulations and future concerns and to optimise the development of statistical routines. The BIRO (Best Information Through Regional Outcomes) project delivers a specific method of privacy impact assessment that can be conveniently used in similar situations across Europe.

  3. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  4. Integrating Soft Skill Competencies through Project-Based Learning across the Information Systems Curriculum

    Science.gov (United States)

    Woodward, Belle S.; Sendall, Patricia; Ceccucci, Wendy

    2010-01-01

    Contemporary Information Systems graduates will be more marketable in the workplace upon graduation if they have combined competencies in both technical and soft skills: interpersonal communication, teamwork, time management, planning and organizational skills. Team and project-based learning can be used to incorporate soft skill competencies with…

  5. INFORMATION TECHNOLOGIES IN MANAGEMENT OF ENERGY SAVING PROJECTS

    Directory of Open Access Journals (Sweden)

    Дмитро Валерійович МАРГАСОВ

    2015-06-01

    Full Text Available The information technology structure is considered of energy saving projects. The project management diagram of energy saving projects is developed, using GIS, ICS, BIM and other control and visual systems.

  6. Effort assessment in the development of information systems projects

    Directory of Open Access Journals (Sweden)

    Živadinović Jovan

    2015-01-01

    Full Text Available There is a great lack of methods and techniques in the software development process itself, as well as the lack of the appropriate tools that would make it more efficient. The significance of the problem is repeatedly emphasized by the need to ensure a high quality of software and software-based systems. The main objective of this work is to develop and systematize the original formal procedure for assessing the development of information systems in the early stages of the software life cycle, through metrics of the data model. We calculate the metrics of data model by using data that can be read off from a base data model, which is represented with an Entity-Relationship (ER diagram that is defined with four basic concepts: entities, relationships, attributes of entities or relationships and values. The idea is to present the complexity of the process with a function of a number of these concepts and a number of attributes for entity types. Assessment techniques represent the basis for planning and successful performance of software projects. Statistical method was used in this paper and these assessment processes go under the category of empirical parametric methods, although they have some characteristics of the expert estimation method. A developed assessment process represents a step in the efforts to reach suitable measures which we would use to assess the size and complexity of the data model and also to estimate the amount of costs and resources necessary for the development of information systems. Likewise, certain metrics are developed. By being familiar with the data model, we can use these metrics to quantify characteristics of an information system as a whole in the logic design phase. Suggested metrics were tested on specific models and the results are shown here.

  7. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  8. Application of a Sediment Information System to the Three Gorges Project on Yangtze River, China

    Science.gov (United States)

    Cao, Shuyou; Liu, Xingnian; Yang, Kejun; Li, Changzhi

    Based on survey and analysis of a huge number of observed entrance sediment transport data and the research results of physical and numerical modeling of Three Gorges Reservoir on the Yangtze River, a sediment information system was designed. The basis of this system includes spatial data and properties of geographic elements, and various documents involved to the Three Gorges Project (TGP). Database and knowledge base are constructed as the information bank. The running environment is constructed by the general control program to realize requirements about various sediment information. The system chooses the window software as the system software. The techniques of graphical user interfaces and groupware geographic information system are applied in this system. In this phase, the emphases of the system are development of document system, map system, and presentation system. Cross-section system of the TGP was also attached. For further improvement of the system, a prepared interface of decision supporting subsystem is finished.

  9. Smart use of data, information and communication: the INFORM-ed Best Local Practice Project--Grafton Base Hospital.

    Science.gov (United States)

    Lloyd, Sheree; Collie, Jean; McInnes, Alastair; King, Kevin; Lollback, Alison; Garland, Angie

    This paper describes current progress for an information management project in a medium-sized rural hospital after the first four months of the one-year project. In particular, the article examines some of the project outcomes to date as these relate to the National Hospitals and Health Reform recommendations for the smart use of data, information and communication. The paper identifies a number of important challenges and issues that have been addressed by the project and proposes that the project findings may be used to inform similar projects in other settings. These findings relate to clinician requirements for reports, investment in human resources, development, and time for information management activities. An understanding of data collected, information systems, and presentation of clinician data are also important. The benefits of information sharing in assisting quality improvement activities are particularly relevant but, more importantly, they can engage and involve clinicians in the use of information. The importance of local data, information, and knowledge is described. Finally, issues for the health information management profession, such as working collegially and sharing knowledge and expertise, are outlined.

  10. Improving a health information system for real-time data entries: An action research project using socio-technical systems theory.

    Science.gov (United States)

    Adaba, Godfried Bakiyem; Kebebew, Yohannes

    2018-03-01

    This paper presents the findings of an action research (AR) project to improve a health information system (HIS) at the Operating Theater Department (OTD) of a National Health Service (NHS) hospital in South East England, the UK. Informed by socio-technical systems (STS) theory, AR was used to design an intervention to enhance an existing patient administration system (PAS) to enable data entries in real time while contributing to the literature. The study analyzed qualitative data collected through interviews, participant observations, and document reviews. The study found that the design of the PAS was unsuitable to the work of the three units of the OTD. Based on the diagnoses and STS theory, the project developed and implemented a successful intervention to enhance the legacy system for data entries in real time. The study demonstrates the value of AR from a socio-technical perspective for improving existing systems in healthcare settings. The steps adopted in this study could be applied to improve similar systems. A follow-up study will be essential to assess the sustainability of the improved system.

  11. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  12. Research and Development for an Operational Information Ecology: The User-System Interface Agent Project

    Science.gov (United States)

    Srivastava, Sadanand; deLamadrid, James

    1998-01-01

    The User System Interface Agent (USIA) is a special type of software agent which acts as the "middle man" between a human user and an information processing environment. USIA consists of a group of cooperating agents which are responsible for assisting users in obtaining information processing services intuitively and efficiently. Some of the main features of USIA include: (1) multiple interaction modes and (2) user-specific and stereotype modeling and adaptation. This prototype system provides us with a development platform towards the realization of an operational information ecology. In the first phase of this project we focus on the design and implementation of prototype system of the User-System Interface Agent (USIA). The second face of USIA allows user interaction via a restricted query language as well as through a taxonomy of windows. In third phase the USIA system architecture was revised.

  13. Djeen (Database for Joomla!'s Extensible Engine): a research information management system for flexible multi-technology project administration.

    Science.gov (United States)

    Stahl, Olivier; Duvergey, Hugo; Guille, Arnaud; Blondin, Fanny; Vecchio, Alexandre Del; Finetti, Pascal; Granjeaud, Samuel; Vigy, Oana; Bidaut, Ghislain

    2013-06-06

    With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. We developed Djeen (Database for Joomla!'s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group.Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material.

  14. Status of the Decommissioning Project Management Information System Development of KAERI in 2015

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho

    2015-01-01

    Various information systems have been developed and used at decommissioning sites for planning a project, record keeping for a post management and cost estimation. KAERI is the only one expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR-1 and 2 and UCP (Uranium Conversion Plant) decommission. KRR-1 and KRR-2 are TRIGA MARK type of research reactor which were constructed worldwide. Hence, there are many chance to use decommissioning experiences and data when other TRIGA MARK type of research reactors start to decommission. KAERI DPMIS stands for Decommissioning Project Management Information System, which is aiming to re-use of data effectively. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DPMIS application program, which is going to be an important mile stone of decommission industry in Korea. User friendly graphical interface and lots of actual data let people well understood on decommission planning. It is expected that continuous effort and funds will be delivered to this research

  15. Status of the Decommissioning Project Management Information System Development of KAERI in 2015

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    Various information systems have been developed and used at decommissioning sites for planning a project, record keeping for a post management and cost estimation. KAERI is the only one expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR-1 and 2 and UCP (Uranium Conversion Plant) decommission. KRR-1 and KRR-2 are TRIGA MARK type of research reactor which were constructed worldwide. Hence, there are many chance to use decommissioning experiences and data when other TRIGA MARK type of research reactors start to decommission. KAERI DPMIS stands for Decommissioning Project Management Information System, which is aiming to re-use of data effectively. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DPMIS application program, which is going to be an important mile stone of decommission industry in Korea. User friendly graphical interface and lots of actual data let people well understood on decommission planning. It is expected that continuous effort and funds will be delivered to this research.

  16. JUICE: a data management system that facilitates the analysis of large volumes of information in an EST project workflow.

    Science.gov (United States)

    Latorre, Mariano; Silva, Herman; Saba, Juan; Guziolowski, Carito; Vizoso, Paula; Martinez, Veronica; Maldonado, Jonathan; Morales, Andrea; Caroca, Rodrigo; Cambiazo, Veronica; Campos-Vargas, Reinaldo; Gonzalez, Mauricio; Orellana, Ariel; Retamales, Julio; Meisel, Lee A

    2006-11-23

    Expressed sequence tag (EST) analyses provide a rapid and economical means to identify candidate genes that may be involved in a particular biological process. These ESTs are useful in many Functional Genomics studies. However, the large quantity and complexity of the data generated during an EST sequencing project can make the analysis of this information a daunting task. In an attempt to make this task friendlier, we have developed JUICE, an open source data management system (Apache + PHP + MySQL on Linux), which enables the user to easily upload, organize, visualize and search the different types of data generated in an EST project pipeline. In contrast to other systems, the JUICE data management system allows a branched pipeline to be established, modified and expanded, during the course of an EST project. The web interfaces and tools in JUICE enable the users to visualize the information in a graphical, user-friendly manner. The user may browse or search for sequences and/or sequence information within all the branches of the pipeline. The user can search using terms associated with the sequence name, annotation or other characteristics stored in JUICE and associated with sequences or sequence groups. Groups of sequences can be created by the user, stored in a clipboard and/or downloaded for further analyses. Different user profiles restrict the access of each user depending upon their role in the project. The user may have access exclusively to visualize sequence information, access to annotate sequences and sequence information, or administrative access. JUICE is an open source data management system that has been developed to aid users in organizing and analyzing the large amount of data generated in an EST Project workflow. JUICE has been used in one of the first functional genomics projects in Chile, entitled "Functional Genomics in nectarines: Platform to potentiate the competitiveness of Chile in fruit exportation". However, due to its ability to

  17. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  18. Implementation of Service Learning and Civic Engagement for Computer Information Systems Students through a Course Project at the Hashemite University

    Science.gov (United States)

    Al-Khasawneh, Ahmad; Hammad, Bashar K.

    2013-01-01

    Service learning methodologies provide information systems students with the opportunity to create and implement systems in real-world, public service-oriented social contexts. This paper presents a case study of integrating a service learning project into an undergraduate Computer Information Systems course titled "Information Systems"…

  19. How do top managers support strategic information system projects and why do they sometimes withhold this support?

    NARCIS (Netherlands)

    Boonstra, A.

    Top management support is an important determinant of information system project success. This is especially the case in complex and large-scale IS projects. Surprisingly, however, there is only limited reliable knowledge about the types of behavior that underlie top management support. Further,

  20. Information management for nuclear power stations: project description

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  1. Concept and Establishment of the Mine Information System within the CROMAC GIP Project

    Directory of Open Access Journals (Sweden)

    Zvonko Biljecki

    2006-12-01

    Full Text Available In order to solve mine problems in the Republic of Croatia, a unique project CROMAC GIP (Croatian Mine Action Centre Geoinformation Project has been initiated significantly increasing the functional quality of the existing Mine Information System (MIS. Since mine problems are closely related to space, geodata are a crucial part of MIS intended for monitoring and planning of demining. Since the moment the Croatian Mine Action Centre was funded till today, the process of demining has progressed. The implementation of a topographic database in accordance with the CROTIS data model and the usage of orthophoto data produced according to the official product specifications can be pointed out in that progress. Usage of such geodata requires a sophisticated information system that enables a simultaneous usage of geodata and other data connected with solving mine problems. In order to reach all goals in demining and to use all advantages of geodata, it was indispensable to upgrade the existing Mine Information System by merging geodata and HCR data and to collect new data according to the standardized procedures, but controlling at the same time the quality and automated procedures of uploading into the system. Apart from being constructed in accordance with the Standard Operative Procedures (SOP, the modernised MIS is also based on generally accepted standards in the field of geoinformation and it is implemented on advanced technology. The core of the system is the Oracle database, and GeoMedia is a WebMap Professional tool on the basis of which the distribution and the work with spatial data is possible on intranet/Internet. In order to achieve full efficiency of the system, it is necessary to provide high quality and updated geodata. In this respect, photogrammetric data are the most efficient solution.

  2. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  3. Customization of Project Management Techniques for the Construction of IT - Information Technology Systems with the Development Methodologies Known as Agile Processes

    Directory of Open Access Journals (Sweden)

    Altino José Mentzingen de Moraes

    2016-08-01

    Full Text Available The theory presented by PMBoK© - Project Management Book of Knowledge [1], edited and maintained by PMI - Project Management Institute, which deals with the issues of how to administrate a Project efficiently and planned, is already widely known and recognized by the world professional community as a strong orientation of best practices and effective working tool in this field. The PMBoK© - Project Management Book of Knowledge directs the Phases and the Disciplines that must be addressed in leading a Project, whether it be, both to meet the construction of projects in Engineering Area or to meet the System Development Projects in the Area of IT - Information Technology. In the latter Area, namely the area of IT - Information Technology, the theory presented by PMBoK© - Project Management Book of Knowledge is already intensively applied for some decades. However, the System Development Methodologies in IT - Information Technology area is being reviewed by the emergence of new technical resources and new visions of interpretation of the business by the Organizations. In that way, this study intends to evaluate the current impact of these revisions (in System Development Methodologies in IT - Information Technology area may result in new versions of the PMBoK© - Project Management Book of Knowledge, which, also implemented revisions and at this moment is in its 5th.Edition. In conclusion, after some simulations in a practical environment, it is verified the usefulness of this paper (and its "Table of Definition of Specific Features of Project", which try to support the decision about what is the best System Development Methodology in IT - Information Technology area to be applied to a specific Project as an effective management and planning tool in corporate real world.

  4. Djeen (Database for Joomla!’s Extensible Engine): a research information management system for flexible multi-technology project administration

    Science.gov (United States)

    2013-01-01

    Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665

  5. JUICE: a data management system that facilitates the analysis of large volumes of information in an EST project workflow

    Directory of Open Access Journals (Sweden)

    Martinez Veronica

    2006-11-01

    Full Text Available Abstract Background Expressed sequence tag (EST analyses provide a rapid and economical means to identify candidate genes that may be involved in a particular biological process. These ESTs are useful in many Functional Genomics studies. However, the large quantity and complexity of the data generated during an EST sequencing project can make the analysis of this information a daunting task. Results In an attempt to make this task friendlier, we have developed JUICE, an open source data management system (Apache + PHP + MySQL on Linux, which enables the user to easily upload, organize, visualize and search the different types of data generated in an EST project pipeline. In contrast to other systems, the JUICE data management system allows a branched pipeline to be established, modified and expanded, during the course of an EST project. The web interfaces and tools in JUICE enable the users to visualize the information in a graphical, user-friendly manner. The user may browse or search for sequences and/or sequence information within all the branches of the pipeline. The user can search using terms associated with the sequence name, annotation or other characteristics stored in JUICE and associated with sequences or sequence groups. Groups of sequences can be created by the user, stored in a clipboard and/or downloaded for further analyses. Different user profiles restrict the access of each user depending upon their role in the project. The user may have access exclusively to visualize sequence information, access to annotate sequences and sequence information, or administrative access. Conclusion JUICE is an open source data management system that has been developed to aid users in organizing and analyzing the large amount of data generated in an EST Project workflow. JUICE has been used in one of the first functional genomics projects in Chile, entitled "Functional Genomics in nectarines: Platform to potentiate the competitiveness of Chile in

  6. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  7. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  8. Future-oriented computerized information system for power plant process control in a pilot project at Philippsburg nuclear power plant

    International Nuclear Information System (INIS)

    Woehrle, G.; Kraft, M.

    1988-01-01

    The motivation for the pilot project at Philippsburg nuclear power plant resulted from the Three Mile Island accident in 1979. The primary task embraces an efficient computer-aided reduction of information when a fault occurs based on a process engineering analysis of the information accrued. Accompanying this are a consolidation and evaluation of the information available in the control room. In this pilot project the new tasks of status monitoring, information reduction and operationalcontrol have been realized for the first time using a computer-aided process information system. In addition to the existing control computer, an information computer with approximately 1200 analogue and about 10000 binary signals has been installed. The installation of the system was completed in 1984 and in the meantime initial operational experience has become available. (orig.) [de

  9. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  10. Acousto-optic laser projection systems for displaying TV information

    International Nuclear Information System (INIS)

    Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M; Shakin, O V

    2015-01-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  11. Acousto-optic laser projection systems for displaying TV information

    Science.gov (United States)

    Gulyaev, Yu V.; Kazaryan, M. A.; Mokrushin, Yu M.; Shakin, O. V.

    2015-04-01

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation.

  12. Acousto-optic laser projection systems for displaying TV information

    Energy Technology Data Exchange (ETDEWEB)

    Gulyaev, Yu V [V.A.Kotel' nikov Institute of Radio Engineering and Electronics, Russian Academy of Sciences, Moscow (Russian Federation); Kazaryan, M A [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation); Mokrushin, Yu M [D.V. Efremov Scientific Research Institute of Electrophysical Apparatus (Russian Federation); Shakin, O V [Ioffe Physical Technical Institute, Russian Academy of Sciences, St. Petersburg (Russian Federation)

    2015-04-30

    This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)

  13. Knowledge-based geographic information systems on the Macintosh computer: a component of the GypsES project

    Science.gov (United States)

    Gregory Elmes; Thomas Millette; Charles B. Yuill

    1991-01-01

    GypsES, a decision-support and expert system for the management of Gypsy Moth addresses five related research problems in a modular, computer-based project. The modules are hazard rating, monitoring, prediction, treatment decision and treatment implementation. One common component is a geographic information system designed to function intelligently. We refer to this...

  14. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16; UIS BW Umweltinformationssystem Baden-Wuerttemberg. F+E-Vorhaben INOVUM. Innovative Umweltinformationssysteme. Phase I 2014/16

    Energy Technology Data Exchange (ETDEWEB)

    Weissenbach, Kurt [Ministerium fuer Umwelt, Klima und Energiewirtschaft Baden-Wuerttemberg, Stuttgart (Germany); Schillinger, Wolfgang [Landesanstalt fuer Umwelt, Messungen und Naturschutz Baden-Wuerttemberg (LUBW), Karlsruhe (Germany); Weidemann, Rainer (ed.) [Karlsruher Institut fuer Technologie (Germany). Inst. fuer Angewandte Informatik

    2016-07-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  15. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  16. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  17. Solid waste information and tracking system client-server conversion project management plan

    International Nuclear Information System (INIS)

    May, D.L.

    1998-01-01

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion. It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  18. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    International Nuclear Information System (INIS)

    Joyner, William Scott; Knight, Mark A.

    2013-01-01

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information

  19. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    Energy Technology Data Exchange (ETDEWEB)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  20. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  1. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  2. Tourism information system

    OpenAIRE

    Ulevičius, Žygimantas

    2017-01-01

    The goal of this project is to create responsive design portal with the tools for its administration which lets users to access tourist relevant information. In order to achieve the goal certain tasks were formulated, few technical analysis were done and similar systems which already exist were reviewed. The result is creation of information system with administrative tools, which can be used by several user types which have rights to take adequate actions. The system has account control modu...

  3. PORTFOLIO SELECTION OF INFORMATION SYSTEMS PROJECTS USING PROMETHEE V WITH C-OPTIMAL CONCEPT

    Directory of Open Access Journals (Sweden)

    Jonatas A. de Almeida

    2014-05-01

    Full Text Available This paper presents a multicriteria decision model for selecting a portfolio of information system (IS projects, which integrates strategic and organizational view within a multicriteria decision structure. The PROMETHEE V method, based on outranking relations is applied, considering the c-optimal concept in order to overcome some scaling problems found in the classical PROMETHEE V approach. Then, a procedure is proposed in order to make a final analysis of the c-optimal portfolios found as a result of using PROMETHEE V. Also, the organizational view is discussed, including some factors that may influence decision making on IS projects to be included in the portfolio, such as adding the company's strategic vision and technical aspects that demonstrate how IS contributes value to a company's business.

  4. Implementation of Service Learning and Civic Engagement for Students of Computer Information Systems through a Course Project at the Hashemite University

    Science.gov (United States)

    Al-Khasawneh, Ahmad; Hammad, Bashar K.

    2015-01-01

    Service learning methodologies provide students of information systems with the opportunity to create and implement systems in real-world, public service-oriented social contexts. This paper presents a case study which involves integrating a service learning project into an undergraduate Computer Information Systems course entitled…

  5. JPL Project Information Management: A Continuum Back to the Future

    Science.gov (United States)

    Reiz, Julie M.

    2009-01-01

    This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.

  6. Development of technical information processing systems

    International Nuclear Information System (INIS)

    Lee, Ji Ho; Kim, Tae Whan; Kim, Sun Ja; Kim, Young Min; Choi, Kwang; Oh, Joung Hun; Choung, Hyun Suk; Keum, Jong Yong; Yoo, An Na; Harn, Deuck Haing; Choun, Young Chun

    1993-12-01

    The major goal of this project is to develop a more efficient information management system by connecting the KAREI serials database which enable the users to access from their own laboratory facilities through KAREI-NET. The importance of this project is to make the serials information of KAERI easily accessible to users as valuable resources for R and D activities. The results of the project are as follows. 1) Development of the serials database and retrieval system enabled us to access to the serials holding information through KAERI-NET. 2) The database construction establishes a foundation for the management of 1,600 serials held in KAERI. 3) The system can be applied not only to KAERI but also to similar medium-level libraries. (Author)

  7. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  8. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  9. EKORISK project - an information system for prediction and expert evaluation of environmental impact

    International Nuclear Information System (INIS)

    Zaimov, V.; Antonov, A.

    1993-01-01

    The aim of this project is to create an expert system for prediction, evaluation and decision making support in case of accidents. The system consists of the following modules: 1) A data base containing information about the situation - geographical and demographical data for the region of the accident as well as data about the contaminants. The data about geographic objects (boundaries, rivers, roads, towns, soils, etc.) is managed and visualized by a geographic information system (GIS), which produces multi-layer geographical maps, showing different viewpoints of the region of interest. Information about the pollutants, their use and storage, as well as data about the available resources for action in case of accidents, are stored in relational data bases which guarantee easy access, search, sorting and proper visualisation. 2) Predicting the propagation of contamination by using actual meteorological information and applying mathematical models for propagation of the spilled substances in the air, water and ground. They calculate the concentration of the substance as a function of time and distance from the initial spill location. The choice of the proper model is made by applying expert knowledge for evaluation of situation and comparing the model characteristics. 3) Suggesting actions for minimising the accident's impact. Expert knowledge is used for recommendations concerning deactivating of the region as well as actions for reducing the absorbed radiation doses of population. The modern technologies for knowledge processing and the object-oriented approach ensure flexibility and integration of all subsystems. (author)

  10. Recommendations for an Executive Information System (EIS) for the NASA Accounting and Financial Information System (NAFIS)

    Science.gov (United States)

    Goss, Ernest Preston

    1991-01-01

    The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.

  11. Activity System Theory Approach to Healthcare Information System

    OpenAIRE

    Bai, Guohua

    2004-01-01

    Healthcare information system is a very complex system and has to be approached from systematic perspectives. This paper presents an Activity System Theory (ATS) approach by integrating system thinking and social psychology. First part of the paper, the activity system theory is presented, especially a recursive model of human activity system is introduced. A project ‘Integrated Mobile Information System for Diabetic Healthcare (IMIS)’ is then used to demonstrate a practical application of th...

  12. ON EXPERIENCE OF THE COLLABORATION AND PROJECT MANAGEMENT INFORMATION SYSTEM PODIO IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    Andrii V. Semenets

    2014-12-01

    Full Text Available The Information Technologies role in the medical university management is analyzed. The importance of the application of the electronic document management in the medical universities is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. A Podio collaboration and project management cloud service features overview is presented. The methodology of the Podio capabilities usage to the medical university task management solving is developed. An approaches to the Podio Workspaces and Applications development for the faculties collaboration and project management in the departments of the medical universities are presented. The examples of the Podio features usage to the work-flow automation of the information-analytical and hardware and software support departments of the Ternopil State Medical University named after I. Ja. Horbachevsky are shown.

  13. Is ‘Community’ Important for Community Information Systems?

    DEFF Research Database (Denmark)

    Freeman, Alison; Hyland, Peter; Freeman, Mark Bruce

    2013-01-01

    that inform viability (i.e. leadership, active membership, funding, awareness, and system design and functionality), and also considers the impact of community context. This study argues that the viability of a Community Information System cannot be considered in isolation. All factors are directly impacted......Community information systems have the power to transform communities. However, without fully understanding the pre-requisite factors affecting community information system viability, and the complex relationships between these factors, communities struggle to manage such projects in a way...... that leads to viable systems that deliver real benefits. This paper develops and presents a Model of Community Information System Viability Pre-requisite Factors, based on both existing literature and the study of three community information system projects. This Model represents the generic factors...

  14. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  15. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  16. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  17. Development of technical information processing system(VI)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jee Hoh; Kim, Tae Hwan; Choi, Kwang; Chung, Hyun Sook; Keum, Jong Yong [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-12-01

    This project is to establish high-quality information circulation system by developing serials-control system to improve serials management from ordering to distributing and availability on R and D and to advance in quality of information service needed in R and D by fast retrieval and providing of research information with CD-Net. The results of the project are as follows. 1. Serials management process which covers from ordering to distributing have higher efficiency by development of subscription information system. 2. Systematic control on each issue of serials is achieved by development of serials checking system. 3. It is possible to provide vol. and no. information of issue received currently to researchers promptly by improvement of serials holding information system. 4. Retrieval of research information contained in various CD-ROM DB throughout KAERI-NET is possible by research on construction methods of CD-Net. 2 figs, 25 refs. (Author).

  18. Development of technical information processing system(VI)

    International Nuclear Information System (INIS)

    Lee, Jee Hoh; Kim, Tae Hwan; Choi, Kwang; Chung, Hyun Sook; Keum, Jong Yong

    1994-12-01

    This project is to establish high-quality information circulation system by developing serials-control system to improve serials management from ordering to distributing and availability on R and D and to advance in quality of information service needed in R and D by fast retrieval and providing of research information with CD-Net. The results of the project are as follows. 1. Serials management process which covers from ordering to distributing have higher efficiency by development of subscription information system. 2. Systematic control on each issue of serials is achieved by development of serials checking system. 3. It is possible to provide vol. and no. information of issue received currently to researchers promptly by improvement of serials holding information system. 4. Retrieval of research information contained in various CD-ROM DB throughout KAERI-NET is possible by research on construction methods of CD-Net. 2 figs, 25 refs. (Author)

  19. Nuclear Criticality Information System. Database examples

    Energy Technology Data Exchange (ETDEWEB)

    Foret, C.A.

    1984-06-01

    The purpose of this publication is to provide our users with a guide to using the Nuclear Criticality Information System (NCIS). It is comprised of an introduction, an information and resources section, a how-to-use section, and several useful appendices. The main objective of this report is to present a clear picture of the NCIS project and its available resources as well as assisting our users in accessing the database and using the TIS computer to process data. The introduction gives a brief description of the NCIS project, the Technology Information System (TIS), online user information, future plans and lists individuals to contact for additional information about the NCIS project. The information and resources section outlines the NCIS database and describes the resources that are available. The how-to-use section illustrates access to the NCIS database as well as searching datafiles for general or specific data. It also shows how to access and read the NCIS news section as well as connecting to other information centers through the TIS computer.

  20. Nuclear Criticality Information System. Database examples

    International Nuclear Information System (INIS)

    Foret, C.A.

    1984-06-01

    The purpose of this publication is to provide our users with a guide to using the Nuclear Criticality Information System (NCIS). It is comprised of an introduction, an information and resources section, a how-to-use section, and several useful appendices. The main objective of this report is to present a clear picture of the NCIS project and its available resources as well as assisting our users in accessing the database and using the TIS computer to process data. The introduction gives a brief description of the NCIS project, the Technology Information System (TIS), online user information, future plans and lists individuals to contact for additional information about the NCIS project. The information and resources section outlines the NCIS database and describes the resources that are available. The how-to-use section illustrates access to the NCIS database as well as searching datafiles for general or specific data. It also shows how to access and read the NCIS news section as well as connecting to other information centers through the TIS computer

  1. 基于UML的PPP项目融资管理信息系统的分析%Analysis of PPP Project Financing Management Information System Based on UML

    Institute of Scientific and Technical Information of China (English)

    郭卫萍; 何楠

    2012-01-01

    PPP项目融资过程中,为便于各主体之间以及主体与外部环境之间信息的流通与传递,实现PPP项目融资过程中的信息化管理,运用UML可视化建模语言对PPP项目融资管理信息系统进行功能分析,创建用例图、类图和顺序图等,从而为后期开发PPP项目融资管理信息系统奠定基础。%In the process of PPP project financing, in order to facilitate the circulation and transmission of information between the main bodies and between the subject and external environment, and realize the process of information management of the PPP project fi- nancing, this paper uses the visualized modeling language UML throughout the whole process of the design of the PPP project financing management information system, and introduces the concept and features of PPP financing model and the related concepts of UML mod- eling firstly, then analyses the function of the PPP project financing management information system, and finally, analyses PPP project financing management information system with the UML modeling. It creates the use case diagram, the class diagram and the sequence diagram for the PPP project financing management information system. Thus it lays foundation for the later development of PPP project financing management information system.

  2. Onondaga Lake Watershed – A Geographic Information System Project Phase I – Needs assessment and spatial data framework

    Science.gov (United States)

    Freehafer, Douglas A.; Pierson, Oliver

    2004-01-01

    In the fall of 2002, the Onondaga Lake Partnership (OLP) formed a Geographic Information System (GIS) Planning Committee to begin the process of developing a comprehensive watershed geographic information system for Onondaga Lake. The goal of the Onondaga Lake Partnership geographic information system is to integrate the various types of spatial data used for scientific investigations, resource management, and planning and design of improvement projects in the Onondaga Lake Watershed. A needs-assessment survey was conducted and a spatial data framework developed to support the Onondaga Lake Partnership use of geographic information system technology. The design focused on the collection, management, and distribution of spatial data, maps, and internet mapping applications. A geographic information system library of over 100 spatial datasets and metadata links was assembled on the basis of the results of the needs assessment survey. Implementation options were presented, and the Geographic Information System Planning Committee offered recommendations for the management and distribution of spatial data belonging to Onondaga Lake Partnership members. The Onondaga Lake Partnership now has a strong foundation for building a comprehensive geographic information system for the Onondaga Lake watershed. The successful implementation of a geographic information system depends on the Onondaga Lake Partnership’s determination of: (1) the design and plan for a geographic information system, including the applications and spatial data that will be provided and to whom, (2) the level of geographic information system technology to be utilized and funded, and (3) the institutional issues of operation and maintenance of the system.

  3. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Crump, K.

    1978-01-01

    An Australian university architect studying management information systems programs at academic institutions in the United States visited 26 universities and colleges and nine educational and professional associations, including extended visits at the University of Wisconsin and the National Center of Higher Education Management Systems. During these visits, he investigated university and college space utilization programs, gained operational and developmental experience at institutions with education philosophies similar to those in Australia, and examined trends in low cost student housing. This report of his observations focusses on management information systems projects throughout the academic community, resource accountability, energy conservation, facilities planning for the handicapped, student housing, and interdisciplinary approaches to education.

  4. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    Energy Technology Data Exchange (ETDEWEB)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  5. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  6. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  7. Stakeholder Analysis as a Medium to Aid Change in Information System Reengineering Projects

    Directory of Open Access Journals (Sweden)

    Jean Davison

    2004-04-01

    Full Text Available The importance of involving stakeholders within a change process is well recognised, and successfully managed change is equally important. Information systems development and redesign is a form of change activity involving people and social issues and therefore resistance to change may occur. A stakeholder identification and analysis (SIA technique has been developed as an enhancement to PISO® (Process Improvement for Strategic Objectives, a method that engages the users of a system in the problem solving and reengineering of their own work-based problem areas. The SIA technique aids the identification and analysis of system stakeholders, and helps view the projected outcome of system changes and their effect on relevant stakeholders with attention being given to change resistance to ensure smooth negotiation and achieve consensus. A case study is presented here describing the successful implementation of a direct appointment booking system for patients within the National Health Service in the UK, utilising the SIA technique, which resulted in a feeling of empowerment and ownership of the change of those involved.

  8. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  9. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  10. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  11. Photogrammetry, Digital mapping and Land Informations Systems

    DEFF Research Database (Denmark)

    Frederiksen, Poul

    1998-01-01

    Monitoring activities on photogrammetry, digital mapping and land information systems in State Land Service in Latvia in relation to the EU Phare Project Phase II, Technical Assistance to land Privatisation and registration in Latvia.......Monitoring activities on photogrammetry, digital mapping and land information systems in State Land Service in Latvia in relation to the EU Phare Project Phase II, Technical Assistance to land Privatisation and registration in Latvia....

  12. Columbia River Coordinated Information System (CIS); Information Needs, 1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Petrosky, Charlie (Idaho Department of Fish and Game, Boise, ID); Kinney, William J. (Washington Department of Fishereis, Olympia, WA); Rowe, Mike (Shoshone-Bannock Tribes, Fort Hall, ID)

    1993-05-01

    Successful application of adaptive management to rebuilding the Columbia Basin`s anadromous fish resources requires that available information and experience be organized and shared between numerous organizations and individuals. Much of this knowledge exists only in unpublished form in agency and individual files. Even that information which is published in the form of technical and contract reports receives only limited distribution and is often out of print and unavailable after a few years. Only a small fraction of the basin`s collective knowledge is captured in permanent and readily available databases and recognized journals. State, tribal, and federal fishery managers have recognize these information management problems and have committed to a program, the Coordinated Information System Project, to capture and share more easily the core data and other information upon which management decisions are based. That project is now completing the process of scoping and identification of information needs. Construction of prototype systems will begin in 1992. This report is one in a series of seven describing the results of the Coordinated Information on System scoping and needs identification phase.

  13. Using accounting information systems by operations managers in a project company

    NARCIS (Netherlands)

    Wouters, Marc; van der Veeken, Henk J.M.

    2002-01-01

    This paper describes the results of a case study that investigated the use of accounting information by operations managers in a road building company. There was considerable preplanning before the execution of project activities, but task uncertainty during execution created the need to take

  14. Development of a network-based information infrastructure for fisheries and hydropower information in the Columbia River Basin : Final project report; TOPICAL

    International Nuclear Information System (INIS)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-01-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program

  15. MEMS - Munich Energy Management System. FIA Project: Exchange of research information; MEMS - Muenchner Energiemanagement-System. FIA-Projekt - Forschungs-Informations-Austausch

    Energy Technology Data Exchange (ETDEWEB)

    Funk, H.; Fries, W.

    2001-10-01

    The City of Munich developed the project 'Munich Energy-Management-Systems (MEMS)' with financial support from the Federal Ministry of Economy and Technology. The project is based on a system of building automation using as many standard elements of hardware and software as possible. This will guarantee a high degree of independence from suppliers and subcontractors. The project has led to a reliable working base for the evaluation, measuring and control for ca. 150 municipal buildings. (orig.) [German] Mit dem Projekt 'Muenchner Energie-Management-System (MEMS)' erstellte die Landeshauptstadt Muenchen mit finanzieller Unterstuetzung des Bundesministeriums fuer Wirtschaft und Technologie ein auf der Leitzentrale Haustechnik (LZH) basierendes zentrales Energiemanagementsystem. Die Verwendung moeglichst vieler Standards in Hard- und Software ist dabei ein wesentlicher Gesichtspunkt. Dadurch wurde eine weitgehende Unabhaengigkeit von einem einzelnen Hersteller erreicht. Damit wurde ein Erfassungs-, Auswerte- und Steuerungssystem fuer derzeit rund 150 staedtische Gebaeude geschaffen. (orig.)

  16. The intelligent user interface for NASA's advanced information management systems

    Science.gov (United States)

    Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.

    1987-01-01

    NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.

  17. Business Analytics as a Tool to Transforming Information into an Informing System: The Case of the On-Line Course Registration System

    Directory of Open Access Journals (Sweden)

    Dimitar Grozdanov Christozov

    2017-06-01

    Impact on Society\tTransforming Information towards Informing Systems has a significant impact by allowing users to make rational data driven decisions in an efficient way. Future Research:\tThe future of this project is implementation of developed ideas and assessment of the results. Impact on Society\t: Transforming Information towards Informing Systems has a significant impact by allowing users to make rational data driven decisions in an efficient way. Future Research: The future of this project is implementation of developed ideas and assessment of the results.

  18. Information System through ANIS at CeSAM

    Science.gov (United States)

    Moreau, C.; Agneray, F.; Gimenez, S.

    2015-09-01

    ANIS (AstroNomical Information System) is a web generic tool developed at CeSAM to facilitate and standardize the implementation of astronomical data of various kinds through private and/or public dedicated Information Systems. The architecture of ANIS is composed of a database server which contains the project data, a web user interface template which provides high level services (search, extract and display imaging and spectroscopic data using a combination of criteria, an object list, a sql query module or a cone search interfaces), a framework composed of several packages, and a metadata database managed by a web administration entity. The process to implement a new ANIS instance at CeSAM is easy and fast : the scientific project has to submit data or a data secure access, the CeSAM team installs the new instance (web interface template and the metadata database), and the project administrator can configure the instance with the web ANIS-administration entity. Currently, the CeSAM offers through ANIS a web access to VO compliant Information Systems for different projects (HeDaM, HST-COSMOS, CFHTLS-ZPhots, ExoDAT,...).

  19. A Costing Model for Project-Based Information and Communication Technology Systems

    Science.gov (United States)

    Stewart, Brian; Hrenewich, Dave

    2009-01-01

    A major difficulty facing IT departments is ensuring that the projects and activities to which information and communications technologies (ICT) resources are committed represent an effective, economic, and efficient use of those resources. This complex problem has no single answer. To determine effective use requires, at the least, a…

  20. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  1. Space Geodesy Project Information and Configuration Management Procedure

    Science.gov (United States)

    Merkowitz, Stephen M.

    2016-01-01

    This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.

  2. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  3. Developing a knowledge system for information operations

    CSIR Research Space (South Africa)

    Leenen, L

    2011-03-01

    Full Text Available In this paper we describe a research project to develop an optimal information retrieval system in an Information Operations domain. Information Operations is the application and management of information to gain an advantage over an opponent...

  4. Study of system safety evaluation on LTO of national project. NISA safety research project on system safety of nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Masayuki; Sekimura, Naoto; Miyano, Hiroshi; Aoyama, Katsunobu

    2012-01-01

    Japanese safety regulatory body, that is, Nuclear and Industrial Safety Agency (NISA) started a 5-year national safety research project as 'the first stage' from 2006 FY to 2010 FY whose objective is 'Improve the technical information basis in order to utilize knowledge as well as information related to ageing management and maintenance of NPPs. Fukushima disaster happened in March 2011, and the priority of research needs for ageing management dramatically changed in Japan. The second-stage national project started in October 2011 with the concept of 'system safety' of NNPs where not only ageing management on degradation phenomena of important components but also safety management on total plant systems are paid attention to. The second-stage project is so called 'Japanese Ageing Management Program for System Safety (JAMPSS)'. (author)

  5. The Oklahoma Geographic Information Retrieval System

    Science.gov (United States)

    Blanchard, W. A.

    1982-01-01

    The Oklahoma Geographic Information Retrieval System (OGIRS) is a highly interactive data entry, storage, manipulation, and display software system for use with geographically referenced data. Although originally developed for a project concerned with coal strip mine reclamation, OGIRS is capable of handling any geographically referenced data for a variety of natural resource management applications. A special effort has been made to integrate remotely sensed data into the information system. The timeliness and synoptic coverage of satellite data are particularly useful attributes for inclusion into the geographic information system.

  6. Development of technical information processing system (VII)

    International Nuclear Information System (INIS)

    Kim, Tae Whan; Choi, Kwang; Oh, Jeong Hoon; Jeong, Hyun Sook; Keum, Jong Yong

    1995-12-01

    The goal of this project is to establish integrated environment focused on enhanced information services to researchers through the providing of acquisition information, key phrase retrieval function, journal content information linked with various subsystems already developed. The results of the project are as follows. 1. It is possible to serve information on unreceivable materials among required materials throughout the system. 2. Retrieval efficiency is increased by the adding of key phrase retrieval function. 3. Rapidity of information service is enhanced by the providing of journal contents of each issue received and work performance of contents service is become higher. 4. It is possible to acquire, store, serve technical information needed in R and D synthetically and systematically throughout the development of total system linked with various subsystems required to technical information management and service. 21 refs. (Author)

  7. Nuclear employee data system (NEDS), a pilot project

    International Nuclear Information System (INIS)

    Britz, W.L.

    1984-01-01

    This paper describes a pilot project being funded by six east coast nuclear utilities: the Nuclear Employee Data System (NEDS). The NEDS is to be a customized computer-based information management system that will receive, update, and maintain in-processing information among the NEDS participating utilities. A comprehensive set of data requirements has been preliminarily identified and characterized into areas of: personal information, security information, health physics information, respiratory protective equipment information, medical information, and training information. The NEDS is expected to become operational next summer

  8. Energy research information system (eris) projects report. volume 4, number 1. Report for December 1978-June 1979

    International Nuclear Information System (INIS)

    Boyd, C.A.; Jelinek, J.

    1979-06-01

    The goal of the Energy Research Information System (ERIS) is to provide an inventory of the energy related programs and research activities from 1974 to the present in the States of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include: coal, petroleum, oil shales, fission fuels, synthetic fuels, hydro-energy, renewable energy, resources, energy policy, reclamation, socioeconomic impacts, environmental impacts and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and the titles of reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords

  9. Using geographic information systems

    International Nuclear Information System (INIS)

    Winsor, R.W.

    1997-01-01

    A true Geographic Information System (GIS) is a computer mapping system with spatial analysis ability and cartographic accuracy that will offer many different projections. GIS has evolved to become an everyday tool for a wide range of users including oil companies, worldwide. Other systems are designed to allow oil and gas companies to keep their upstream data in the same format. Among these are the Public Petroleum Data Model developed by Gulf Canada, Digitech and Applied Terravision Systems of Calgary, the system developed and marketed by the Petrotechnical Open Software Corporation in the United States, and the Mercury projects by IBM. These have been developed in an effort to define an industry standard. The advantages and disadvantages of open and closed systems were discussed. Factors to consider when choosing a GIS system such as overall performance, area of use and query complexity, were reviewed. 3 figs

  10. Systems for the management of information in a university context: an investigation of user need. Information systems, Universities, Information strategy

    Directory of Open Access Journals (Sweden)

    Marcella R.

    2004-01-01

    Full Text Available The accessibility, reliability, consistency, and relevance of data underpinning information systems are crucial to its use and effectiveness in a university setting. This article reports on the findings of a research project carried out at a new university, which highlighted the role information plays in the success of the operation and in allowing the institution to evolve and meet the challenges posed by the government, students and other stakeholders. Data were gathered from the academic and administrative staff of the university through interviews with senior managers, and a Web-based questionnaire completed by 863 respondents (a 47.9% response rate. The project aimed to explore data and information activities supporting management and strategic decision making in a new university. Project results indicate that there are real deficiencies in the realization of the case institution's information strategy and that these deficiencies must be addressed in developments focusing on improving strategic effectiveness in the future. Particular issues identified included the lack of clarity in responsibility regarding information and concerns about the validity of much of the internally created and maintained data.

  11. Reframing Success and Failure of Information Systems

    DEFF Research Database (Denmark)

    Cecez-Kecmanovic, Dubravka; Kautz, Karlheinz; Abrahall, Rebecca

    2014-01-01

    -networks of developers, managers, technologies, project documents, methodologies, and other actors. Drawing from a controversial case of a highly innovative information system in an insurance company-considered a success and failure at the same time- the paper reveals the inherent indeterminacy of IS success and failure......he paper questions common assumptions in the dominant representational framings of information systems success and failure and proposes a performative perspective that conceives IS success and failure as relational effects performed by sociomaterial practices of IS project actor...... that performed both different IS realities and competing IS assessments. The analysis shows that the IS project and the implemented system as objects of assessment are not given and fixed, but are performed by the agencies of assessment together with the assessment outcomes of success and failure. The paper...

  12. 75 FR 23834 - Occupational Information System

    Science.gov (United States)

    2010-05-04

    ... Development and Research, Occupational Information Development Project, Social Security Administration, 3-E-26... the unit's emerging and ongoing ideas, research, and methods. 5. Need for Basic & Applied Research The... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2010-0018] Occupational Information System AGENCY...

  13. Disposal Site Information Management System

    International Nuclear Information System (INIS)

    Larson, R.A.; Jouse, C.A.; Esparza, V.

    1986-01-01

    An information management system for low-level waste shipped for disposal has been developed for the Nuclear Regulatory Commission (NRC). The Disposal Site Information Management System (DSIMS) was developed to provide a user friendly computerized system, accessible through NRC on a nationwide network, for persons needing information to facilitate management decisions. This system has been developed on NOMAD VP/CSS, and the data obtained from the operators of commercial disposal sites are transferred to DSIMS semiannually. Capabilities are provided in DSIMS to allow the user to select and sort data for use in analysis and reporting low-level waste. The system also provides means for describing sources and quantities of low-level waste exceeding the limits of NRC 10 CFR Part 61 Class C. Information contained in DSIMS is intended to aid in future waste projections and economic analysis for new disposal sites

  14. Design and Management of Networked Information Systems

    DEFF Research Database (Denmark)

    Havn, Erling; Bansler, Jørgen P.

    1996-01-01

    In this paper, we present a newly started research project at the Center for Tele-Information at the Technical University of Denmark. The project focuses on the design and management of networked information systems, that is computer-based IS linked by a wide area network and supporting...... research questions:1. What is the essence of the new managerial theories and models and how do they define the role of telecommunications and IT in organizations?2. How are these organizational theories and models implemented in practice?3. How is the design and implementation of information systems...... and networks actually organized and carried out?4. What are the consequences for work content, skills, working conditions, etc.? The research project consists of a theoretical analysis of contemporary management theories as well as a number of in-depth case studies of firms engaged in the design...

  15. Report of the Project Research on Disaster Reduction using Disaster Mitigating Information Sharing Technology

    Science.gov (United States)

    Suzuki, Takeyasu

    For the purpose of reducing disaster damage by applying information sharing technologies, "the research on disaster reduction using crisis-adaptive information sharing technologies" was carried out from July, 2004 through March 2007, as a three year joint project composed of a government office and agency, national research institutes, universities, lifeline corporations, a NPO and a private company. In this project, the disaster mitigating information sharing platform which is effective to disaster response activities mainly for local governments was developed, as a framework which enables information sharing in disasters. A prototype of the platform was built by integrating an individual system and tool. Then, it was applied to actual local governments and proved to be effective to disaster responses. This paper summarizes the research project. It defines the platform as a framework of both information contents and information systems first and describes information sharing technologies developed for utilization of the platform. It also introduces fields tests in which a prototype of the platform was applied to local governments.

  16. Information System Specific in Achievement of Construction Projects

    Directory of Open Access Journals (Sweden)

    Cătălin Onuţu

    2005-01-01

    Full Text Available Because of the economic changes from our country and also of the rapid adjusting necessity to the requirement of a market economy, it is observed a huge request for information, and especially techniques, tools, methodologies that would facilitate the managerial activity in any field. In the construction field the problem is even more serious because of specific aspects and of the traditional information system that is very stiff. Formal and bureaucratic, and this makes the adjusting process of specialist to the economic realities to be more difficult.

  17. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  18. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  19. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  20. Designing a public web-based information system to illustrate and disseminate the development and results of the DESIRE Project to combat desertification.

    Science.gov (United States)

    Geeson, Nichola; Brandt, Jane; Quaranta, Giovanni; Salvia, Rosanna

    2014-11-01

    Until around 1995 it was challenging to make the scientific results of research projects publicly available except through presentations at meetings or conferences, or as papers in academic journals. Then it began to be clear that the Internet could become the main medium to publish and share new information with a much wider audience. The DESIRE Project (desertification mitigation and remediation of land-a global approach for local solutions) has built on expertise gained in previous projects to develop an innovative online 'Harmonized Information System' (HIS). This documents the context, delivery and evaluation of all tasks in the DESIRE Project using non-scientific terminology, with much of it also available in the local languages of the study sites. The DESIRE-HIS makes use of new possibilities for communication, including video clips, interactive tools, and links to social media networks such as Twitter. Dissemination of research results using this approach has required careful planning and design. This paper sets out the steps that have culminated in a complete online Information System about local solutions to global land management problems in desertification-affected areas, including many practical guidelines for responsible land management. As many of those who are affected by desertification do not have Internet access, printable dissemination materials are also available on the DESIRE-HIS.

  1. Designing a Public Web-Based Information System to Illustrate and Disseminate the Development and Results of the DESIRE Project to Combat Desertification

    Science.gov (United States)

    Geeson, Nichola; Brandt, Jane; Quaranta, Giovanni; Salvia, Rosanna

    2014-11-01

    Until around 1995 it was challenging to make the scientific results of research projects publicly available except through presentations at meetings or conferences, or as papers in academic journals. Then it began to be clear that the Internet could become the main medium to publish and share new information with a much wider audience. The DESIRE Project (desertification mitigation and remediation of land—a global approach for local solutions) has built on expertise gained in previous projects to develop an innovative online `Harmonized Information System' (HIS). This documents the context, delivery and evaluation of all tasks in the DESIRE Project using non-scientific terminology, with much of it also available in the local languages of the study sites. The DESIRE-HIS makes use of new possibilities for communication, including video clips, interactive tools, and links to social media networks such as Twitter. Dissemination of research results using this approach has required careful planning and design. This paper sets out the steps that have culminated in a complete online Information System about local solutions to global land management problems in desertification-affected areas, including many practical guidelines for responsible land management. As many of those who are affected by desertification do not have Internet access, printable dissemination materials are also available on the DESIRE-HIS.

  2. Information and image integration: project spectrum

    Science.gov (United States)

    Blaine, G. James; Jost, R. Gilbert; Martin, Lori; Weiss, David A.; Lehmann, Ron; Fritz, Kevin

    1998-07-01

    The BJC Health System (BJC) and the Washington University School of Medicine (WUSM) formed a technology alliance with industry collaborators to develop and implement an integrated, advanced clinical information system. The industry collaborators include IBM, Kodak, SBC and Motorola. The activity, called Project Spectrum, provides an integrated clinical repository for the multiple hospital facilities of the BJC. The BJC System consists of 12 acute care hospitals serving over one million patients in Missouri and Illinois. An interface engine manages transactions from each of the hospital information systems, lab systems and radiology information systems. Data is normalized to provide a consistent view for the primary care physician. Access to the clinical repository is supported by web-based server/browser technology which delivers patient data to the physician's desktop. An HL7 based messaging system coordinates the acquisition and management of radiological image data and sends image keys to the clinical data repository. Access to the clinical chart browser currently provides radiology reports, laboratory data, vital signs and transcribed medical reports. A chart metaphor provides tabs for the selection of the clinical record for review. Activation of the radiology tab facilitates a standardized view of radiology reports and provides an icon used to initiate retrieval of available radiology images. The selection of the image icon spawns an image browser plug-in and utilizes the image key from the clinical repository to access the image server for the requested image data. The Spectrum system is collecting clinical data from five hospital systems and imaging data from two hospitals. Domain specific radiology imaging systems support the acquisition and primary interpretation of radiology exams. The spectrum clinical workstations are deployed to over 200 sites utilizing local area networks and ISDN connectivity.

  3. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  4. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem...

  5. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...

  6. Energy research information system projects report, volume 5, number 1

    Science.gov (United States)

    Johnson, J.; Schillinger, L.

    1980-07-01

    The system (ERIS) provides an inventory of the energy related programs and research activities from 1974 to the present in the states of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include coal, reclamation, water resources, environmental impacts, socioeconomic impacts, energy conversion, mining methodology, petroleum, natural gas, oilshale, renewable energy resources, nuclear energy, energy conservation and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and title reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords.

  7. MyOcean Information System : achievements and perspectives

    Science.gov (United States)

    Loubrieu, T.; Dorandeu, J.; Claverie, V.; Cordier, K.; Barzic, Y.; Lauret, O.; Jolibois, T.; Blower, J.

    2012-04-01

    MyOcean system (http://www.myocean.eu) objective is to provide a Core Service for the Ocean. This means MyOcean is setting up an operational service for forecasts, analysis and expertise on ocean currents, temperature, salinity, sea level, primary ecosystems and ice coverage. The production of observation and forecasting data is distributed through 12 production centres. The interface with the external users (including web portal) and the coordination of the overall service is managed by a component called service desk. Besides, a transverse component called MIS (myOcean Information System) aims at connecting the production centres and service desk together, manage the shared information for the overall system and implement a standard Inspire interface for the external world. 2012 is a key year for the system. The MyOcean, 3-year project, which has set up the first versions of the system is ending. The MyOcean II, 2-year project, which will upgrade and consolidate the system is starting. Both projects are granted by the European commission within the GMES Program (7th Framework Program). At the end of the MyOcean project, the system has been designed and the 2 first versions have been implemented. The system now offers an integrated service composed with 237 ocean products. The ocean products are homogeneously described in a catalogue. They can be visualized and downloaded by the user (identified with a unique login) through a seamless web interface. The discovery and viewing interfaces are INSPIRE compliant. The data production, subsystems availability and audience are continuously monitored. The presentation will detail the implemented information system architecture and the chosen software solutions. Regarding the information system, MyOcean II is mainly aiming at consolidating the existing functions and promoting the operations cost-effectiveness. In addition, a specific effort will be done so that the less common data features of the system (ocean in

  8. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  9. The Perceived Impact of the Agile Development and Project Management Method Scrum on Information Systems and Software Development Productivity

    DEFF Research Database (Denmark)

    Kautz, Karlheinz; Johansen, Thomas Heide; Uldahl, Andreas

    2013-01-01

    This research contributes to the body of knowledge in information systems development (ISD) with an empirical investigation in form of a case study that demonstrates the positive impact of the agile development and project management method Scrum on information systems and software development...... productivity and it provides a useful operationalization of the concept through seven identified indicators for productivity. Despite the fact that the case unit had challenges with the use of Scrum, the indicators identified the areas where the company had managed to exploit the potential of Scrum and its...... practices with regard to increasing productivity. The research results are discussed both with regard to the existing Scrum literature as well as to complex adaptive systems (CAS) as a foundation for ISD and agile development....

  10. OWEGIS : case study of the development of an ecospatial information system

    Energy Technology Data Exchange (ETDEWEB)

    Graham, P.N.; Elston, S.A. [James W. Sewall Co., Old Town, ME (United States)

    2010-07-01

    This PowerPoint presentation discussed an ecospatial information system designed for use in the siting and permitting of wind power projects. The offshore wind energy geographic information system (OWEGIS) combined ecological and geospatial information systems within a GIS framework in order to support the integration, analysis and display of critical ecological, environmental, and infrastructure information in relation to the siting and permitting of renewable energy projects. The OWEGIS system was designed to provide a mechanism for assessing the multiple impacts of ocean renewable energy in an intuitive, interactive manner in order to educate project stakeholders and regulators. Key assessment criteria were identified to evaluate offshore wind sites and relevant state and federal permitting regulations. Existing GIS data were combined with observational and value-added data. The criteria included physical characteristics, coastal restrictions, human activities, infrastructure, and legal, technical, and permitting boundaries. The system has been used during the development of wind projects located off the coast of Maine. tabs., figs.

  11. Intelligent Information System for Waste Management; Jaetehuollon aelykaes tietojaerjestelmae iWaste

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, T. [Kuopio Univ. (Finland)

    2003-07-01

    'iWaste' is a project for developing and testing intelligent computational methods for more comprehensive waste management. Important issues are automated reporting, optimisation of waste collection, forecasting of waste formation, data handling of waste disposal sites and simulation and modelling of regional waste management. The main objective of the project is to identify and analyse known sources of information and to link them to the existing information processing systems in the field of waste management. Additionally, the goal is to identify and test functional elements that could be developed further to software products and services. The results of the project can be categorized into three sectors. Firstly, the guidelines for a comprehensive information system in waste management will be created. This includes the requirement specifications of different parties, definitions for the data exchange interfaces and an architectural plan for software products capable of co-operative processing. Secondly, the central parts of the intelligent information system will be piloted using the research database collected in the early stage of the project. The main topics investigated are data quality, the use of Geographical Information Systems (GIS), automated reporting, optimisation of waste collection and forecasting of waste formation. Additionally, the pilot information system can be utilized in derivative projects to speed up the starting phases of them. This makes it possible to create persistent development of waste management information systems both academically and commercially. (orig.)

  12. The Impact of PMIS Training: Patterns of Benefit Realization in Project Management Information Systems Training

    Directory of Open Access Journals (Sweden)

    Andrew McCarty

    2017-01-01

    Full Text Available The benefits of project, program, and portfolio management software toolsets can be enhanced through training. Little is known about the realization of positive, beneficial outcomes and Project Management Information System (PMIS training. This research seeks to improve understanding of project management software toolset training practices and outcomes. This study examines the prevalence, effectiveness, and impact-per-hour efficiency of training in real-world organizations. We further explore relationships between individual and organizational characteristics and training outcomes. Formulae for estimating training costs are derived using regression modeling. Surveys were collected from 1,021 active professionals and analyzed using quantitative methods. Research participants were practitioners recruited by eight different companies, industry groups, and professional organizations within the PMIS community. The findings of this research indicate significant differences in utilization, efficacy, and efficiency of PMIS training in practice. The outcomes and methodologies of this study are being incorporated into ongoing research that focuses on improving PMIS training delivery, evaluation, and planning. The outcomes of this research may result in more effective, efficient, and economical PMIS training that is better tailored to the unique needs of each organization.

  13. Distance courses on the subject «Management of information projects» based on technology Moodle

    OpenAIRE

    ZIANGIROVA LINEZA FAATOVNA

    2016-01-01

    The article is devoted to development of a remote course on discipline "Management of information projects" in the direction of preparation "Applied informatics" on the basis of distance learning MOODLE (Modular Object-Oriented Dynamic Learning Environment) system. There are considered the methodology of information systems introduction, decisions introduction organization unified model in the methodologies of Microsoft Solutions Framework (MSF), the project integration and contents managemen...

  14. A cost-benefit analysis for materials management information systems.

    Science.gov (United States)

    Slapak-Iacobelli, L; Wilde, A H

    1993-02-01

    The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.

  15. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  16. Research and Development Information System (RDIS)

    Data.gov (United States)

    Department of Veterans Affairs — The Research and Development Information System (RDIS) is the Veterans Affairs Central Office budgetary and project data repository for managing the VA Research and...

  17. NCPC Central Files Information System (CFIS)

    Data.gov (United States)

    National Capital Planning Commission — This dataset contains records from NCPC's Central Files Information System (CFIS), which is a comprehensive database of projects submitted to NCPC for design review...

  18. Intelligent information system for waste management; Jaetehuollon aelykaes tietojaerjestelmae

    Energy Technology Data Exchange (ETDEWEB)

    Nuortio, T. [Kuopio Univ. (Finland)

    2005-07-01

    'iWaste - Intelligent Information System for Waste Management' - was a joint project of the University of Kuopio and the Tampere University of Technology. The main objective of the project was to improve the management and use of waste management data. Also the project focused on the development of information management systems. The results of the project are numerous. A study of the present state of information management in the field of waste management was carried out. The studied aspects were for example information needs of different actors and their requirements for the information quality, communication requirements among different actors, and the characteristics and applications of the software products. The conceptual data model of waste management was developed and resulted as the hyper document for connecting waste and information management specialists, and for research and educational purposes. Also, this model can be used for the development of political regulation. Methodologies and models for processing data into information for decision making were developed. The methodologies and models include e.g. data mining techniques, prediction of waste generation and optimisation of waste pick-up and transport. (orig.)

  19. Creating a management system for customer information for a small business CASE: Botisto

    OpenAIRE

    Aho, Timo

    2012-01-01

    The purpose of this thesis project was to find and create a better solution for handling customer information at Botisto. Botisto is Spanish company selling mass customized men’s footwear. Before this thesis project, the customer information was collected manually. This information consisted, for example, of names, preferred shoe sizes and address information. During this project, it was decided that a customer information system will to be created from scratch. The system was develop...

  20. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  1. Lessons learned in the deployment of a HIV counseling and testing management information system on a new project.

    Science.gov (United States)

    Makinde, Olusesan A; Ezomike, Chioma F; Lehmann, Harold P; Ibanga, Iko J

    2011-11-28

    To share our experience on how we used simple but detailed processes and deployed a management information system on a new HIV counseling and testing (HCT) project in Nigeria. The procedures used in this study were adopted for their strength in identifying areas of continuous improvement as the project was implemented. We used an iterative brainstorming technique among 30 participants (volunteer counselors and project management staff) as well as iterative quality audits to identify several limitations to the success of the project and to propose solutions. We then implemented the solutions and reevaluated for performance. Findings from the evaluations were then reintroduced into the brainstorming and planning sessions. Several limitations were identified with the most prominent being the poor documentation of records at the site and the lack of a document transfer trail for audit purposes. Communication, cohesion and team focus are necessary to achieve success on any new project. Institutionalizing routine HIV behavioral surveillance using data collected at HCT will help in streamlining interventions that will be evidence-based. 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins

  2. Project financing versus corporate financing under asymmetric information

    OpenAIRE

    Anton Miglo

    2008-01-01

    In recent years financing through the creation of an independent project company or financing by non-recourse debt has become an important part of corporate decisions. Shah and Thakor (JET, 1987) argue that project financing can be optimal when asymmetric information exists between firm's insiders and market participants. In contrast to that paper, we provide an asymmetric information argument for project financing without relying on corporate taxes, costly information production or an assump...

  3. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  4. Software engineering principles applied to large healthcare information systems--a case report.

    Science.gov (United States)

    Nardon, Fabiane Bizinella; de A Moura, Lincoln

    2007-01-01

    São Paulo is the largest city in Brazil and one of the largest cities in the world. In 2004, São Paulo City Department of Health decided to implement a Healthcare Information System to support managing healthcare services and provide an ambulatory health record. The resulting information system is one of the largest public healthcare information systems ever built, with more than 2 million lines of code. Although statistics shows that most software projects fail, and the risks for the São Paulo initiative were enormous, the information system was completed on-time and on-budget. In this paper, we discuss the software engineering principles adopted that allowed to accomplish that project's goals, hoping that sharing the experience of this project will help other healthcare information systems initiatives to succeed.

  5. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  6. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  7. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  8. The Perceived Impact of the Agile Development and Project Management Method Scrum on Information Systems and Software Development Productivity

    Directory of Open Access Journals (Sweden)

    Karlheinz Kautz

    2014-11-01

    Full Text Available This research contributes to the body of knowledge in information systems development (ISD with an empirical investigation in form of a case study that demonstrates the positive impact of the agile development and project management method Scrum on information systems and software development productivity and it provides a useful operationalization of the concept through seven identified indicators for productivity. Despite the fact that the case unit had challenges with the use of Scrum, the indicators identified the areas where the company had managed to exploit the potential of Scrum and its practices with regard to increasing productivity. The research results are discussed both with regard to the existing Scrum literature as well as to complex adaptive systems (CAS as a foundation for ISD and agile development.

  9. Free and Open Source Management Information Systems and ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    What is the impact of introducing an automated management information system within a microfinance institution or savings and credit cooperative on the employees, the clients and the business processes? The project will involve deployment of an open source management information system (Mifos Vanilla) in two ...

  10. Surface Waters Information Management System (SWIMS)

    Data.gov (United States)

    Kansas Data Access and Support Center — The Surface Waters Information Management System (SWIMS) has been designed to meet multi-agency hydrologic database needs for Kansas. The SWIMS project was supported...

  11. Supporting data and calculations for the NNWSI [Nevada Nuclear Waste Storage Investigations] project information management system concepts evaluation report

    International Nuclear Information System (INIS)

    1986-12-01

    This report presents the supporting data and calculations that provided the basis for the NNWSI Project Information Management System Concepts Evaluation Report. Project documentation estimates for numbers of documents and pages are presented for all nine Project participants. These estimates cover the time period from 1980 to 1990. In addition, the report presents a calculational method for estimating document and page volumes beyond the year 1990. Electronic character code and bit-mapped image storage requirements associated with the page volumes are also shown and the calculational method described. Six conceptual system approaches capable of satisfying NNWSI Project requirements are defined and described. These approaches include: fully centralized microfilm system based on computer-assisted retrieval (CAR) (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical disk system based on electronic image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). All assumptions associated with these approaches are given. Data sheets in an appendix describe the capital equipment and labor components that were used as the basis of the cost evaluation. Definitions of two cost scenarios cover: (1) processing of all documents and pages and (2) processing of 10% of the total documents and 30% of the total pages. Capital equipment, labor, and summary cost tables for the years from 1987 through 1991 are presented for both scenarios. The report also describes a case for starting system operations in 1988 instead of 1987 and complete cost tables for the 1988 start-up case are given. 1 ref

  12. Considerations on Risk in Supply Chain Management Information Systems Implementation

    Directory of Open Access Journals (Sweden)

    Valentin-Petru Măzăreanu

    2013-02-01

    Full Text Available Innovation in information and communication technologies resulted in the digital revolution. This kind of revolution is changing the way people work, learn, communicate and manage their businesses. Due to the need to achieve the competitive advantage and to meet the business requirements, we are witnessing an increasing shift from business to e-business and mobile business. In this kind of world solutions like Supply Chain Management (SCM are increasingly appearing. The business success depends on how effective the information system works. Any interruption of the information system will inevitably lead to business loss. To ensure the successful implementation of a SCM project it is necessary to study even from the early stages which are the possible actions / risks / obstacles which might damage in one way or another the execution of the project. The role of the literature and case studies review in the field of interest is undeniable because it provides us with access to the so-called lessons-learned. By using this approach, in this paper, we present the most common risks and risk sources encountered in the implementation projects of SCM type information systems. We also propose a risk identification framework that can be used in the early stages of the implementation project of a Supply Chain Management information system.

  13. The Sellafield repository project information programme

    Energy Technology Data Exchange (ETDEWEB)

    Curd, P J [United Kingdom Nirex Limited (United Kingdom)

    1993-07-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  14. The Sellafield repository project information programme

    International Nuclear Information System (INIS)

    Curd, P.J.

    1993-01-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  15. Managing collaboration across boundaries in health information technology projects.

    Science.gov (United States)

    Garrety, Karin; Dalley, Andrew; McLoughlin, Ian; Wilson, Rob; Yu, Ping

    2012-01-01

    One reason that it is so difficult to build electronic systems for collecting and sharing health information is that their design and implementation requires clear goals and a great deal of collaboration among people from diverse social and occupational worlds. This paper uses empirical examples from two Australian health informatics projects to illustrate the importance of boundary objects and boundary spanning activities in facilitating the high degree of collaboration required for the design and implementation of workable systems.

  16. Liquid Effluent Monitoring Information System (LEMIS) System Construction

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The liquid effluent sampling program is part of the effort to minimize adverse environmental impact during the cleanup operation at the Hanford Site. Of the 33 Phase I and Phase II liquid effluents, all streams actively discharged to the soil column will be sampled. The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Construction document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  17. Development of an identification system for potential ICES projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    An earlier study by Real Estate Research Corporation (RERC) provides an overview of methods for developing marketing strategies for ICES. One aim of that document was to establish an information system for identifying areas, subareas, sites, or projects with substantial growth or development activity as potential candidates for the application of ICES. This report summarizes RERC's effort to implement and test such an information system. The specific objectives of this report are: (1) identify and collect basic information on 150 large-scale construction projects; (2) identify areas of the country, i.e., states and SMSAs that evidence general growth characteristics that would support ICES applications; (3) identify regions, states, and SMSAs that display higher-than-average energy costs; and (4) identify regions, states, and SMSAs that have experienced significant activity in identified land-use sectors and subsectors. Recent development activities in the commercial, industrial, residential, institutional, and transportation sectors are detailed. Mixed-use projects are included within the commercial sector. An annotated bibliography is included. (MCW)

  18. Project Integration Architecture: A Practical Demonstration of Information Propagation

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  19. Information and Communications Technologies Health Projects in Panama: A Systematic Review and their Relation with Public Policies.

    Science.gov (United States)

    Sánchez, Gema Anabel Castillo; Berbey, Aranzazu; de la Torre-Díez, Isabel; López-Coronado, Miguel

    2017-07-01

    This paper presents a review about Information and Communications Technologies (ICTs) health projects in Panama. The main contribution is to provide a vision of the situation in Panama, allowing an understanding of the dynamics of health policies and how they have affected the implementation of ICT's Projects to improve the health of Panamanians. We analyze the projects found with ICT's in health of Panama, which allow us to see a perspective of projects information is obtained from 2000 to 2016, however it is important to highlight that there may be other projects that we do not know because we did not find enough information or evidence of the same. That is why this review has interviews with key personnel, who have guided us with the search for information. 56% of technology projects are concentrated in the capital city and only 16% in the province of Chiriquí. 64% of these projects are focused on the development of information systems, mainly focused on electronic patient registration. And 60% refers to projects related to primary health care. The MINSA and CSS both with a 20% participation in ICT project, in addition we can notice the dispersion of projects for hospitals, where each one is developing programs per their needs or priorities. The national information about ICT projects of Health, it has been notorious the state of dispersion and segmented of public health information. We consider that it is a natural consequence of Policy in Panamanian Health System. This situation limits the information retrieval and knowledge of ICT in Health of Panama. To stakeholders, this information is directed so that health policies are designed towards a more effective and integral management, administering the ICT's as tools for the well-being of most the Panamanian population, including indigenous group.

  20. Information system development activities and inquiring systems

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2008-01-01

    This article presents a framework that maps information system development (ISD) activities on systems for the creation of knowledge. This work addresses the relevant and persisting problem of improving the chances of ISD success. The article builds upon previous research on knowledge aspects...... based on ISD literature and on Churchman's (1971) inquiring systems. The second part presents the use of the framework in an ISD project. The case is used to show the applicability of the framework and to highlight the advantages of this approach. The main theoretical implication is that the framework...

  1. Grand societal challenges in information systems research and education

    CERN Document Server

    vom Brocke, Jan; Hofmann, Sara; Tumbas, Sanja

    2015-01-01

    This book examines how information systems research and education can play a major role in contributing to solutions to the Societal Grand Challenges formulated in "The Millennium Project" (millenium-project.org). Individual chapters focus on specific challenges, review existing approaches and contributions towards solutions in information systems research and outline a research agenda for these challenges. The topics considered in this volume range from climate change, population growth, global ICT availability, breakthroughs in science and technology and energy demand to ethical decision-making, policymaking, gender status and transnational crime prevention. It is the first book to present ideas on how the Information Systems discipline can contribute to the solution on this wide spectrum of grand societal challenges.

  2. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  3. Domesday 2000 - a National Land Information System for Britain

    DEFF Research Database (Denmark)

    Sabel, C. E.; Ralphs, M. P.

    1992-01-01

    The Domesday 2000 Project aims to ensure that by the year 2000 there will be a National Land Information System for Britain, containing up to date information on land and property ownership, value and use. It is proposed that the system will make use of distributed databases connected over a wide......-area network, to integrate data from a wide variety of sources, using GIS technology to enable interested parties to access the on-line information via locally based terminals. This article explains the background to the project, before moving on to discuss the proposed format and data holdings...

  4. Outage information system

    International Nuclear Information System (INIS)

    Svengren, Haakan; Meyer, Brita Diskerud

    2005-09-01

    Today's control room systems are designed to operate during power operation, and there is clearly a need for a system to support control room personnel in automatically supervising the status of the plant during the outage period. In order to improve the supervision of Nuclear Power Plants during outages, three prototypes of the Outage Information system have been designed by the Halden Project, one for PWR and two for BWR. The Outage Information System is presented on a large screen, centrally placed in the control room. There will be a PC connected to manage the system. By using signals from the process as input to logic diagrams reflecting the plant's Safety Technical Specifications, the system automatically is supervising that requirements in Safety Technical Specifications are fulfilled during all plant states of the outage period. The system also automatically gives an overview of the status of safety systems and electrical bus bars. Alarm will occur if a requirement in the Safety Technical Specifications is not fulfilled or if a component planned to be ready for operation, is inoperable. In addition, selected measurements being important during the outage period are presented on the large screen. Which measurements and in which way the values will be presented, depends on the plant's control room design and work practice. (Author)

  5. Nuclear technology databases and information network systems

    International Nuclear Information System (INIS)

    Iwata, Shuichi; Kikuchi, Yasuyuki; Minakuchi, Satoshi

    1993-01-01

    This paper describes the databases related to nuclear (science) technology, and information network. Following contents are collected in this paper: the database developed by JAERI, ENERGY NET, ATOM NET, NUCLEN nuclear information database, INIS, NUclear Code Information Service (NUCLIS), Social Application of Nuclear Technology Accumulation project (SANTA), Nuclear Information Database/Communication System (NICS), reactor materials database, radiation effects database, NucNet European nuclear information database, reactor dismantling database. (J.P.N.)

  6. Columbia River Coordinated Information System (CIS), 1992-1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, Mike; Roger, Phillip B.; O' Connor, Dick

    1993-11-01

    The purposes of this report are to: (1) describe the project to date; (2) to document the work and accomplishments of the (CIS) project for Fiscal Year 1993; and (3) to provide a glimpse of future project direction. The concept of a Coordinated Information System (CIS) as an approach to meeting the growing needs for regionally standardized anadromous fish information.

  7. Information management for nuclear power stations: System Design Concept

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  8. South Ukraine Nuclear Power Plant. Advanced Computer Information System Project

    International Nuclear Information System (INIS)

    Hord, J.; Afanasiev, N.; Smith, C.; Kudinov, Yu.

    1997-01-01

    The South Ukraine upgrade is the first of many that will take place in the former eastern bloc countries over the next several years. Westron is currently developing a similar system for the Zaporozhe nuclear power plant. In addition, there are eleven other WWER type units in operation in the Ukraine, as well as twenty seven others in operation throughout Eastern and Central Europe and Russia - all potential upgrade projects. (author)

  9. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  10. Presenting a Framework for Evaluating and Prioritizing Risk of Information Technology Outsourcing: Perspective of Experts in Information Systems Design

    Directory of Open Access Journals (Sweden)

    abbas Keramati

    2012-06-01

    Full Text Available Information technology outsourcing projects have advantages including: reduced costs, improved service quality, creation of competitive advantage, etc. When these projects are being outsourced, lack of attention to their risks causes the lost of anticipated benefits and contributes to failure. As for the growing trend of information technology outsourcing projects in Iran, the purpose of this study is to identify the risks of information technology outsourcing projects, evaluate and prioritize them based on the perspective of experts in information systems design. For achieving these goals, key articles were reviewed and comprehensive list of 12 risk factors were identified. For prioritizing, a Fuzzy Analytical Network Process (F-ANP structure has been provided and the risk factors were laid in it. Then, by using a questionnaire, 13 experts' viewpoints were collected. The results show that the factor of "supplier" and the sub-factor of "Lack of skills of supplier in IT operations" are the most important factors for success and failure of information technology outsourcing projects in the perspective of experts in information systems design.

  11. Management systems oriented to projects: need for its implementation in sports academic institutions

    Directory of Open Access Journals (Sweden)

    Maidelyn Díaz Pérez

    2017-12-01

    Full Text Available The literature refers to the need that all academic institutions have today to use information systems articulated with the different processes that the organization executes. The idea of using this type of system is to convert the available information into knowledge that represents a competitive advantage for the organization. However, despite being a strength for any organization both to manage their strategic information and to manage the information generated by research projects, they are still not widely used. The reality shows that the academic sports institutions of the country and mainly the faculties of physical culture lack a culture in the use of systems to manage different substantive tasks of the center, such as the activity of research projects. It is estimated that if they rely more on the optimal use of the information and knowledge they have at the group level, all their scientific production indicators will be significantly increased. From this scenario, this research aims to expose the main strengths of information and knowledge management systems, mainly those aimed at projects for the stimulation of their use and implementation in academic institutions associated with sports. To achieve this objective, the logical historical method, direct observation, the method of analysis and synthesis, etc. were used. And among the main results obtained in this research there  is the relevance of the use of information management systems and knowledge aimed at projects to contribute to the promotion and success of research activities generated by projects.

  12. Need an Information Security in Access Control System?

    Directory of Open Access Journals (Sweden)

    V. R. Petrov

    2011-12-01

    Full Text Available The purpose of this paper is the general problems of information security in access control system. The field of using is the in project of reconstruction Physical protection system.

  13. Methodology of Adaptive Integrated Accounting System in Information Environment

    Directory of Open Access Journals (Sweden)

    Bochulya Tetyana V.

    2013-12-01

    Full Text Available The goal of the article lies in the study of logical and methodological justification of formation of the integrated system of accounting based on realities of the co-ordinated transformation of the society and economy and development of a new knowledge about formation and adjustment of the accounting system in it’s a priori new information competence with expansion of functionality for the justified idea of existence and development of business. Taking developments of the best representatives of the leading scientific society as a basis, the article offers a new vision of organisation of the accounting system, based on the modern projection of information competence and harmonisation of main processes of information service for adaptation of the system for multi-vector inquiries of consumers of information. Pursuant to results of the conducted study, the article makes an effort to change the established opinion about information and professional competences of the accounting system and attach a new qualitative significance to them. The article makes a proposal with respect to calculation of quality of the information system on the basis of key indicators of its information service. It lays the foundation of the prospective study of the problems of building the accounting system in such a projection, so that realities of internal and external processes were maximally co-ordinated based on the idea of their information development.

  14. World Key Information Service System Designed For EPCOT Center

    Science.gov (United States)

    Kelsey, J. A.

    1984-03-01

    An advanced Bell Laboratories and Western Electric designed electronic information retrieval system utilizing the latest Information Age technologies, and a fiber optic transmission system is featured at the Walt Disney World Resort's newest theme park - The Experimental Prototype Community of Tomorrow (EPCOT Center). The project is an interactive audio, video and text information system that is deployed at key locations within the park. The touch sensitive terminals utilizing the ARIEL (Automatic Retrieval of Information Electronically) System is interconnected by a Western Electric designed and manufactured lightwave transmission system.

  15. Clinicians' perceptions of organizational readiness for change in the context of clinical information system projects: insights from two cross-sectional surveys.

    Science.gov (United States)

    Paré, Guy; Sicotte, Claude; Poba-Nzaou, Placide; Balouzakis, George

    2011-02-28

    The adoption and diffusion of clinical information systems has become one of the critical benchmarks for achieving several healthcare organizational reform priorities, including home care, primary care, and integrated care networks. However, these systems are often strongly resisted by the same community that is expected to benefit from their use. Prior research has found that early perceptions and beliefs play a central role in shaping future attitudes and behaviors such as negative rumors, lack of involvement, and resistance to change. In this line of research, this paper builds on the change management and information systems literature and identifies variables associated with clinicians' early perceptions of organizational readiness for change in the specific context of clinical information system projects. Two cross-sectional surveys were conducted to test our research model. First, a questionnaire was pretested and then distributed to the future users of a mobile computing technology in 11 home care organizations. The second study took place in a large teaching hospital that had approved a budget for the acquisition of an electronic medical records system. Data analysis was performed using partial least squares. Scale items used in this study showed adequate psychometric properties. In Study 1, four of the hypothesized links in the research model were supported, with change appropriateness, organizational flexibility, vision clarity, and change efficacy explaining 75% of the variance in organizational readiness. In Study 2, four hypotheses were also supported, two of which differed from those supported in Study 1: the presence of an effective project champion and collective self-efficacy. In addition to these variables, vision clarity and change appropriateness also helped explain 75% of the variance in the dependent variable. Explanations for the similarities and differences observed in the two surveys are provided. Organizational readiness is arguably a key

  16. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  17. Web-Based Naval Fleet Logistics Information System

    National Research Council Canada - National Science Library

    Li, Yanfeng

    2007-01-01

    .... This project proposes the implementation of a Web-Based Logistics Information System to act as a single platform for Naval supply chain and shipboard customers for effective logistics planning...

  18. Information Theoretic Characterization of Physical Theories with Projective State Space

    Science.gov (United States)

    Zaopo, Marco

    2015-08-01

    Probabilistic theories are a natural framework to investigate the foundations of quantum theory and possible alternative or deeper theories. In a generic probabilistic theory, states of a physical system are represented as vectors of outcomes probabilities and state spaces are convex cones. In this picture the physics of a given theory is related to the geometric shape of the cone of states. In quantum theory, for instance, the shape of the cone of states corresponds to a projective space over complex numbers. In this paper we investigate geometric constraints on the state space of a generic theory imposed by the following information theoretic requirements: every non completely mixed state of a system is perfectly distinguishable from some other state in a single shot measurement; information capacity of physical systems is conserved under making mixtures of states. These assumptions guarantee that a generic physical system satisfies a natural principle asserting that the more a state of the system is mixed the less information can be stored in the system using that state as logical value. We show that all theories satisfying the above assumptions are such that the shape of their cones of states is that of a projective space over a generic field of numbers. Remarkably, these theories constitute generalizations of quantum theory where superposition principle holds with coefficients pertaining to a generic field of numbers in place of complex numbers. If the field of numbers is trivial and contains only one element we obtain classical theory. This result tells that superposition principle is quite common among probabilistic theories while its absence gives evidence of either classical theory or an implausible theory.

  19. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  20. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  1. Grid interoperability: joining grid information systems

    International Nuclear Information System (INIS)

    Flechl, M; Field, L

    2008-01-01

    A grid is defined as being 'coordinated resource sharing and problem solving in dynamic, multi-institutional virtual organizations'. Over recent years a number of grid projects, many of which have a strong regional presence, have emerged to help coordinate institutions and enable grids. Today, we face a situation where a number of grid projects exist, most of which are using slightly different middleware. Grid interoperation is trying to bridge these differences and enable Virtual Organizations to access resources at the institutions independent of their grid project affiliation. Grid interoperation is usually a bilateral activity between two grid infrastructures. Recently within the Open Grid Forum, the Grid Interoperability Now (GIN) Community Group is trying to build upon these bilateral activities. The GIN group is a focal point where all the infrastructures can come together to share ideas and experiences on grid interoperation. It is hoped that each bilateral activity will bring us one step closer to the overall goal of a uniform grid landscape. A fundamental aspect of a grid is the information system, which is used to find available grid services. As different grids use different information systems, interoperation between these systems is crucial for grid interoperability. This paper describes the work carried out to overcome these differences between a number of grid projects and the experiences gained. It focuses on the different techniques used and highlights the important areas for future standardization

  2. HUD INFORMATION SYSTEMS: Immature Software Acquisition Capability Increases Project Risks

    National Research Council Canada - National Science Library

    2001-01-01

    .... GAO has designated HUD's major program areas as high risk, in part because the department's information and financial management systems were poorly integrated, ineffective, and generally unreliable...

  3. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  4. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects.

    Science.gov (United States)

    Kreps, Gary L

    2005-10-01

    This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations.

  5. Methodology for Measuring the Complexity of Enterprise Information Systems

    Directory of Open Access Journals (Sweden)

    Ilja Holub

    2016-07-01

    Full Text Available The complexity of enterprise information systems is currently a challenge faced not only by IT professionals and project managers, but also by the users of such systems. Current methodologies and frameworks used to design and implement information systems do not specifically deal with the issue of their complexity and, apart from few exceptions, do not at all attempt to simplify the complexity. This article presents the author's own methodology for managing complexity, which can be used to complement any other methodology and which helps limit the growth of complexity. It introduces its own definition and metric of complexity, which it defines as the sum of entities of the individual UML models of the given system, which are selected according to the MMDIS methodology so as to consistently describe all relevant content dimensions of the system. The main objective is to propose a methodology to manage information system complexity and to verify it in practice on a real-life SAP implementation project.

  6. Library Information System Time-Sharing (LISTS) Project. Final Report.

    Science.gov (United States)

    Black, Donald V.

    The Library Information System Time-Sharing (LISTS) experiment was based on three innovations in data processing technology: (1) the advent of computer time-sharing on third-generation machines, (2) the development of general-purpose file-management software and (3) the introduction of large, library-oriented data bases. The main body of the…

  7. FY 2000 report on the research cooperation project on the research cooperative follow-up for development of the manufacturing technology supported by advanced and integrated information system through cooperation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The manufacturing technology supported by advanced and integrated information system through cooperation (MATIC), that is, a project supporting the production technology including the international information system and CAD/CAM system, etc. was carried out from FY 1994 to FY 1998. From FY 1999, the follow-up project is being implemented for the spread of the MATIC results, support for the independent R and D and the technical guidance. China, Indonesia, Malaysia and Singapore participated in this project, by which the support and technical guidance were given in three fields: automobiles/the parts; household electric appliances/the parts; fiber/apparel. At present, each country is continuing its own activity for using the system developed in the MATIC project in its country. In this fiscal year, researchers were sent to each country for supporting the activities. Further, the MATIC follow-up committee was established to conduct the drawing-up of a business plan, grasp of the state of the spread/R and D, discussion about problems/subjects, comprehensive evaluation of the MATIC project, etc. (NEDO)

  8. Multi-Modal Traveler Information System - Gateway Functional Requirements

    Science.gov (United States)

    1997-11-17

    The Multi-Modal Traveler Information System (MMTIS) project involves a large number of Intelligent Transportation System (ITS) related tasks. It involves research of all ITS initiatives in the Gary-Chicago-Milwaukee (GCM) Corridor which are currently...

  9. Intelligent Information System for Waste Management; Jaetehuollon aelykaes tietojaerjestelmae - iWaste

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, T. [Kuopio Univ. (Finland); Isoaho, S. [Tampere Univ. (Finland)

    2004-07-01

    ''Waste'' - Intelligent Information System for Waste Management - is a joint project of the University of Kuopio and the Tampere University of Technology. The main objective of the project is to create a basis for more comprehensive utilisation and management of waste management data and for the development of database management systems. The results of the project are numerous. A study of the present state of data management in the field of waste management was carried out. The studied aspects were for example information needs of different actors and their requirements for the information quality, interfaces for information exchange between different actors, and the characteristics of the software products. During the second phase of the project, a hyper document describing waste management systems, and a software application for describing material flows and their management will be finalized. Also methodologies and practices for processing data into information, which is needed in the decision making process, will be developed. The developed methodologies include e.g. data mining techniques, and the practices include e.g. the prediction of waste generation and optimisation of waste collection and transport. (orig.)

  10. Information flow in the DAMA Project beyond database managers: Information flow managers

    Energy Technology Data Exchange (ETDEWEB)

    Russell, L. [Argonne National Lab., IL (United States); Wolfson, O.; Yu, C. [Illinois Univ., Chicago, IL (United States)

    1996-03-01

    To meet the demands of commercial data traffic on the information highway, a new look at managing data is necessary. One projected activity, sharing of point-of-sale information, is being considered in the Demand Activated Manufacturing Project of the American Textile Partnership project. A scenario is examined in which 100,000 retail outlets communicate over a period of days. They provide the latest estimate of demand for sewn products across a chain of 26,000 suppliers through the use of bill-of-materials explosions at four levels of detail. A new paradign the information flow manager, is developed to handle this situation, including the case where members of the supply chain fail to communicate and go out of business. Techniques for approximation are introduced to keep estimates of demand as current as possible.

  11. Appropriate information systems in underdeveloped countries: The case of the Sudan

    International Nuclear Information System (INIS)

    Wesley, C.; Weyers, R.

    1990-05-01

    Considers the application of new technology to information systems in underdeveloped countries taking the case of the National Documentation Centre (NDC) in Khartoum, Sudan as an example. Describes the implementation of a project there to improve information collection and dissemination using microcomputers and micrographics. The scope of the project is to collect conventional and non-conventional documents produced in and about Sudan in the areas of science, technology and the social sciences, and to maintain databases containing bibliographic, research project, institutional and personnel data. Examines the advantages of microcomputers for underdeveloped countries and other technological developments such as CD-ROM, desktop publishing, expert systems and factors such as exchange of data, repackaging of information, and cooperation, all of which are likely to have an impact on scientific and technological information provision in the 1990s. Considers constraints to introducing new technology (hardware/software procurement and maintenance, operating conditions, existing document delivery systems, absence of information sharing culture) but argues that a longer term development strategy which allows for training, long term funding, cooperation and appropriate computer applications will result in sustainable information systems development in underdeveloped countries. (author). 11 refs

  12. Appropriate information systems in underdeveloped countries: The case of the Sudan

    Energy Technology Data Exchange (ETDEWEB)

    Wesley, C; Weyers, R [National Council for Research, Khartoum (Sudan). National Documentation Centre

    1990-05-01

    Considers the application of new technology to information systems in underdeveloped countries taking the case of the National Documentation Centre (NDC) in Khartoum, Sudan as an example. Describes the implementation of a project there to improve information collection and dissemination using microcomputers and micrographics. The scope of the project is to collect conventional and non-conventional documents produced in and about Sudan in the areas of science, technology and the social sciences, and to maintain databases containing bibliographic, research project, institutional and personnel data. Examines the advantages of microcomputers for underdeveloped countries and other technological developments such as CD-ROM, desktop publishing, expert systems and factors such as exchange of data, repackaging of information, and cooperation, all of which are likely to have an impact on scientific and technological information provision in the 1990s. Considers constraints to introducing new technology (hardware/software procurement and maintenance, operating conditions, existing document delivery systems, absence of information sharing culture) but argues that a longer term development strategy which allows for training, long term funding, cooperation and appropriate computer applications will result in sustainable information systems development in underdeveloped countries. (author). 11 refs.

  13. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  14. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  15. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  16. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  17. Impacts of the Implementation of a Project Management Information System – a Case Study of a Small R

    Directory of Open Access Journals (Sweden)

    Borštnar Mirjana Kljajić

    2014-02-01

    Full Text Available Background: The problems of resources management (human, financial, time in multi-project companies are inherently complex and need to be addressed systematically, in both small and large organizations. Furthermore, there is a need for transparent communication and collaboration within the organization as well as with partnering organizations. There are many methodologies and tools supporting project management, which are themselves complex and are therefore not widely adopted, especially among small companies. Objectives: The aim of this paper is to analyse impact of the implementation of a flexible cloud-based project management information system (PMIS from the human resources, financial management, and collaboration points of view. Method: We have conducted a case study in a small Slovenian research and development company, that has implemented the 4PM PMIS. Results: The findings imply the importance of keeping the balance of the creative processes that are unstructured, rule free and even chaotic, with structured processes monitor and control. Conclusions: The results of the study suggest that the use of “4PM” in support of multi-project management improves human resources and financial management in a collaborative and transparent way when implemented in an open and highly motivated environment

  18. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  19. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects*

    Science.gov (United States)

    Kreps, Gary L.

    2005-01-01

    Objective: This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. Method: The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. Results: The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. Implications: The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations. PMID:16239960

  20. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    Science.gov (United States)

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  1. Use of a Knowledge Management System in Waste Management Projects

    International Nuclear Information System (INIS)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.; Nies, R.A.

    2006-01-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspect will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)

  2. Integrate offsites management with information systems

    Energy Technology Data Exchange (ETDEWEB)

    Valleur, M. (TECHNIP, Paris (France))

    1993-11-01

    Computerized offsites management systems in oil refineries offer a unique opportunity to integrate advanced technology into a coherent refinery information system that contributes to benefits-driven optimal operations: from long-term, multirefinery linear programming (LP) models to sequential control of transfer lineups in the tank farm. There are strong incentives to automate and optimize the offsites operations, and benefits can be quantified to justify properly sized projects. The paper discusses the following: business opportunities, oil movement and advanced technology, project scoping and sizing, review of functional requirements, transfer automation, blending optimal control, on-line analyzers, oil movement and scheduling, organizational issues, and investment and benefits analysis.

  3. A projective surgical navigation system for cancer resection

    Science.gov (United States)

    Gan, Qi; Shao, Pengfei; Wang, Dong; Ye, Jian; Zhang, Zeshu; Wang, Xinrui; Xu, Ronald

    2016-03-01

    Near infrared (NIR) fluorescence imaging technique can provide precise and real-time information about tumor location during a cancer resection surgery. However, many intraoperative fluorescence imaging systems are based on wearable devices or stand-alone displays, leading to distraction of the surgeons and suboptimal outcome. To overcome these limitations, we design a projective fluorescence imaging system for surgical navigation. The system consists of a LED excitation light source, a monochromatic CCD camera, a host computer, a mini projector and a CMOS camera. A software program is written by C++ to call OpenCV functions for calibrating and correcting fluorescence images captured by the CCD camera upon excitation illumination of the LED source. The images are projected back to the surgical field by the mini projector. Imaging performance of this projective navigation system is characterized in a tumor simulating phantom. Image-guided surgical resection is demonstrated in an ex-vivo chicken tissue model. In all the experiments, the projected images by the projector match well with the locations of fluorescence emission. Our experimental results indicate that the proposed projective navigation system can be a powerful tool for pre-operative surgical planning, intraoperative surgical guidance, and postoperative assessment of surgical outcome. We have integrated the optoelectronic elements into a compact and miniaturized system in preparation for further clinical validation.

  4. Third generation participatory design in health informatics--making user participation applicable to large-scale information system projects.

    Science.gov (United States)

    Pilemalm, Sofie; Timpka, Toomas

    2008-04-01

    Participatory Design (PD) methods in the field of health informatics have mainly been applied to the development of small-scale systems with homogeneous user groups in local settings. Meanwhile, health service organizations are becoming increasingly large and complex in character, making it necessary to extend the scope of the systems that are used for managing data, information and knowledge. This study reports participatory action research on the development of a PD framework for large-scale system design. The research was conducted in a public health informatics project aimed at developing a system for 175,000 users. A renewed PD framework was developed in response to six major limitations experienced to be associated with the existing methods. The resulting framework preserves the theoretical grounding, but extends the toolbox to suit applications in networked health service organizations. Future research should involve evaluations of the framework in other health service settings where comprehensive HISs are developed.

  5. Aiming for knowledge information processing systems

    Energy Technology Data Exchange (ETDEWEB)

    Fuchi, K

    1982-01-01

    The Fifth Generation Computer Project in Japan intends to develop a new generation of computers by extensive research in many areas. This paper discusses many research topics which the Japanese are hoping will lead to a radical new knowledge information processing system. Topics discussed include new computer architecture, programming styles, semantics of programming languages, relational databases, linguistics theory, artificial intelligence, functional images and interference systems.

  6. Management information systems software evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  7. Management information systems software evaluation

    International Nuclear Information System (INIS)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D.

    1995-01-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco

  8. Development of a Hospital Information System

    Science.gov (United States)

    1984-01-01

    4~4and overused statement but true nonrAýheless. Arid, if some- "thing is information fur one and not Cor another, what is it for the latter? It is...scheduling your projects, fantastic! Keep doing itl If you schedule your projects according to a combination of your horoscope , the stock market, and...hospital functions. It is true that knowledge of the tools used in the Systems Development Life Cycle can allow one to go into 4.. any setting and

  9. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  10. Culvert information management system : demonstration project, final report, August 2009.

    Science.gov (United States)

    2009-08-01

    The overall objective of the research was to develop a pilot scale Culvert Information Management System (CIMS) that will : comply with both requirements stipulated by the Governmental Accounting Standards Board (GASB-34) and new federal : storm wate...

  11. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  12. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  13. MULTIPLE PROJECTIONS SYSTEM (MPS) - USER'S MANUAL VERSION 1.0

    Science.gov (United States)

    The report is a user's manual for version 1.0 of the Multiple Projections Systems (MPS), a computer system that can perform "what if" scenario analysis and report the final results (i.e., Rate of Further Progress - ROP - inventories) to EPA (i.e., the Aerometric Information Retri...

  14. Development of a geo-information system for the evaluation of active faults

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Sang Gi; Lee, G. B.; Kim, H. J. [Paichai Univ., Taejon (Korea, Republic of)] (and others)

    2002-03-15

    This project aims to assist the participants of the active fault project by computerizing the field and laboratory data of the study area. The geo-information system, therefore, not only contributes to the participants while they are organizing and analyzing their data but also gathers detailed information in digital form. A geological database can be established by organizing the gathered digital information from the participants, and the database can easily be sheared among specialists. In such purpose, a field system, which can be used by the project participants, has been attempting to be developed during the first project year. The field system contains not only a software but also available topographic and geological maps of the study area. The field system is coded by visual basic, and the mapobject component of ESRI and the TrueDBGrid OCX are also utilized. Major functions of the system are tools for vector and raster form topographic maps, database design and application, geological symbol plot, and the database search for the plotted geological symbol.

  15. Master thesis - Constructing an information system for advice on antibiotic therapy

    DEFF Research Database (Denmark)

    Gardi, Jonathan Eyal; Nielsen, Anders Møller

    used. The framework has been implemented in Java using client/server-architecture. The proposed framework consists of four components: a database, a decision support system, a client component handling interaction with the system, and a component handling the exchange of information between the clients......This report documents the development of a framework for medical information systems. The framework consists of connectivity between the users, the clinical database and the decision support system. This framework is designed to be independent of the information type and the decision support system......, the database and the decision support system. The method of communication between those three components is based CORBA and XML, thus providing portability and context free framework. Applying it to the TREAT project will validate the functionality and usability of the framework. The goal of TREAT project...

  16. Cost-volume-profit and net present value analysis of health information systems.

    Science.gov (United States)

    McLean, R A

    1998-08-01

    The adoption of any information system should be justified by an economic analysis demonstrating that its projected benefits outweigh its projected costs. Analysis differ, however, on which methods to employ for such a justification. Accountants prefer cost-volume-profit analysis, and economists prefer net present value analysis. The article explains the strengths and weaknesses of each method and shows how they can be used together so that well-informed investments in information systems can be made.

  17. [Application of classified protection of information security in the information system of air pollution and health impact monitoring].

    Science.gov (United States)

    Hao, Shuxin; Lü, Yiran; Liu, Jie; Liu, Yue; Xu, Dongqun

    2018-01-01

    To study the application of classified protection of information security in the information system of air pollution and health impact monitoring, so as to solve the possible safety risk of the information system. According to the relevant national standards and requirements for the information system security classified protection, and the professional characteristics of the information system, to design and implement the security architecture of information system, also to determine the protection level of information system. Basic security measures for the information system were developed in the technical safety and management safety aspects according to the protection levels, which effectively prevented the security risk of the information system. The information system established relatively complete information security protection measures, to enhanced the security of professional information and system service, and to ensure the safety of air pollution and health impact monitoring project carried out smoothly.

  18. The EU-project United4Health: User-centred design of an information system for a Norwegian telemedicine service.

    Science.gov (United States)

    Smaradottir, Berglind; Gerdes, Martin; Martinez, Santiago; Fensli, Rune

    2016-10-01

    Organizational changes of health care services in Norway brought to light a need for new clinical pathways. This study presents the design and evaluation of an information system for a new telemedicine service for chronic obstructive pulmonary disease patients after hospital discharge. A user-centred design approach was employed composed of a workshop with end-users, two user tests and a field trial. For data collection, qualitative methods such as observations, semi-structured interviews and a questionnaire were used. User workshop's outcome informed the implementation of the system initial prototype, evaluated by end-users in a usability laboratory. Several usability and functionality issues were identified and solved, such as the interface between the initial colour scheme and the triage colours. Iterative refinements were made and a second user evaluation showed that the main issues were solved. The responses to a questionnaire presented a high score of user satisfaction. In the final phase, a field trial showed satisfactory use of the system. This study showed how the target end-users groups were actively involved in identifying the needs, suggestions and preferences. These aspects were addressed in the development of an information system through a user-centred design process. The process efficiently enabled users to give feedback about design and functionality. Continuous refinement of the system was the key to full development and suitability for the telemedicine service. This research was a result of the international cooperation between partners within the project United4Health, a part of the Seventh Framework Programme for Research of the European Union. © The Author(s) 2015.

  19. Using Executive Information Systems to Manage Capital Projects and Facilities.

    Science.gov (United States)

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  20. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  1. The AMMA information system

    Science.gov (United States)

    Fleury, Laurence; Brissebrat, Guillaume; Boichard, Jean-Luc; Cloché, Sophie; Eymard, Laurence; Mastrorillo, Laurence; Moulaye, Oumarou; Ramage, Karim; Favot, Florence; Roussot, Odile

    2014-05-01

    In the framework of the African Monsoon Multidisciplinary Analyses (AMMA) programme, several tools have been developed in order to facilitate and speed up data and information exchange between researchers from different disciplines. The AMMA information system includes (i) a multidisciplinary user-friendly data management and dissemination system, (ii) report and chart archives associated with display websites and (iii) a scientific paper exchange system. The AMMA information system is enriched by several previous (IMPETUS...) and following projects (FENNEC, ESCAPE, QweCI, DACCIWA…) and is becoming a reference information system about West Africa monsoon. (i) The AMMA project includes airborne, ground-based and ocean measurements, satellite data use, modelling studies and value-added product development. Therefore, the AMMA database user interface enables to access a great amount and a large variety of data: - 250 local observation datasets, that cover many geophysical components (atmosphere, ocean, soil, vegetation) and human activities (agronomy, health). They have been collected by operational networks from 1850 to present, long term monitoring research networks (CATCH, IDAF, PIRATA...) or scientific campaigns; - 1350 outputs of a socio-economics questionnaire; - 60 operational satellite products and several research products; - 10 output sets of meteorological and ocean operational models and 15 of research simulations. All the data are documented in compliance with metadata international standards, and delivered into standard formats. The data request user interface takes full advantage of the data and metadata base relational structure and enables users to elaborate easily multicriteria data requests (period, area, property, property value…). The AMMA data portal counts around 800 registered users and process about 50 data requests every month. The AMMA databases and data portal have been developed and are operated jointly by SEDOO and ESPRI in France

  2. Geographical information systems and computer cartography

    CERN Document Server

    Jones, Chris B

    2014-01-01

    A concise text presenting the fundamental concepts in Geographical Information Systems (GIS), emphasising an understanding of techniques in management, analysis and graphic display of spatial information. Divided into five parts - the first part reviews the development and application of GIS, followed by a summary of the characteristics and representation of geographical information. It concludes with an overview of the functions provided by typical GIS systems. Part Two introduces co-ordinate systems and map projections, describes methods for digitising map data and gives an overview of remote sensing. Part Three deals with data storage and database management, as well as specialised techniques for accessing spatial data. Spatial modelling and analytical techniques for decision making form the subject of Part Four, while the final part is concerned with graphical representation, emphasising issues of graphics technology, cartographic design and map generalisation.

  3. ISCRAM: Information systems for crisis response and management

    International Nuclear Information System (INIS)

    Carle, B.

    2006-01-01

    Information sharing and communication is a key challenge in any crisis situation. With new technologies appearing increasingly faster, and crisis management becoming more complex as more stakeholders get a say in emergency preparedness, the research in the information systems used in emergency preparedness and crisis management is emerging as a multi-disciplinary area. Research and development on decision support systems for radiation protection experts and decision makers and organising complex emergency response exercises are traditionally key domains of expertise in our research group. Together with the UvT (University of Tilburg), and other research groups, we started a series of activities to build a community allowing us to set up collaboration structures and participate in larger projects. The focus of the activities is on all the aspects of design, development, use and evaluation of information systems for crisis response and management. The main objective of this project is to establish a community where both information systems researchers and practitioners (crisis managers and field responders) exchange their experiences and opinions, and learn from each others work. The community helps researchers to get an insight on real life cases and informs professionals about new developments and research. The first goal is to close the loop between research and reality. Formulating new ideas and priorities for research policy makers is an important spin-off of our community building work

  4. Design principles for achieving integrated healthcare information systems.

    Science.gov (United States)

    Jensen, Tina Blegind

    2013-03-01

    Achieving integrated healthcare information systems has become a common goal for many countries in their pursuit of obtaining coordinated and comprehensive healthcare services. This article focuses on how a small local project termed 'Standardized pull of patient data' expanded and is now used on a large scale providing a majority of hospitals, general practitioners and citizens across Denmark with the possibility of accessing healthcare data from different electronic patient record systems and other systems. I build on design theory for information infrastructures, as presented by Hanseth and Lyytinen, to examine the design principles that facilitated this smallscale project to expand and become widespread. As a result of my findings, I outline three lessons learned that emphasize: (i) principles of flexibility, (ii) expansion from the installed base through modular strategies and (iii) identification of key healthcare actors to provide them with immediate benefits.

  5. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-12-01

    BNL is developing and implementing the project ``Geographic Information System (GIS) for Long Island`` to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ``Feasibility of a Geographic Information System for Long Island.`` It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP).

  6. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    International Nuclear Information System (INIS)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-01-01

    BNL is developing and implementing the project ''Geographic Information System (GIS) for Long Island'' to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ''Feasibility of a Geographic Information System for Long Island.'' It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP)

  7. Information Service System For Small Forestowners

    Science.gov (United States)

    Zhang, Shaochen; Li, Yun

    Individual owned forests have boomed in the last decade in China. Hundreds of millions of private forest owners have emerged since years of afforestation practice and collective forest ownership reform. Most of those private forest owners are former peasants living in afforestation areas. They thirst for forestry information, such as technique knowledge, forestry policies, finance, marketing, etc. Unfortunately the ways they could get certain information are very limit. Before internet time, Local governments are the main channel they search helps for useful information and technique supports. State and local governments have paid much attention to provide necessary forestry technique supports to those small forest owners and provided varies training projects, issued official forestry information through their websites. While, as state government expands household contract system in the management of collective forestry land, the number of individual forest owners is bumping up in future 5 years. There is still a gap between supplying ability and requirement of forestry information. To construct an effective forestry information service system in next 3-5 year can bridge the gap. This paper discusses the framework of such an information service system.

  8. Information flow in the DAMA project beyond database managers: information flow managers

    Science.gov (United States)

    Russell, Lucian; Wolfson, Ouri; Yu, Clement

    1996-12-01

    To meet the demands of commercial data traffic on the information highway, a new look at managing data is necessary. One projected activity, sharing of point of sale information, is being considered in the Demand Activated Manufacturing Project (DAMA) of the American Textile Partnership (AMTEX) project. A scenario is examined in which 100 000 retail outlets communicate over a period of days. They provide the latest estimate of demand for sewn products across a chain of 26 000 suppliers through the use of bill of materials explosions at four levels of detail. Enabling this communication requires an approach that shares common features with both workflows and database management. A new paradigm, the information flow manager, is developed to handle this situation, including the case where members of the supply chain fail to communicate and go out of business. Techniques for approximation are introduced so as to keep estimates of demand as current as possible.

  9. The architecture of enterprise hospital information system.

    Science.gov (United States)

    Lu, Xudong; Duan, Huilong; Li, Haomin; Zhao, Chenhui; An, Jiye

    2005-01-01

    Because of the complexity of the hospital environment, there exist a lot of medical information systems from different vendors with incompatible structures. In order to establish an enterprise hospital information system, the integration among these heterogeneous systems must be considered. Complete integration should cover three aspects: data integration, function integration and workflow integration. However most of the previous design of architecture did not accomplish such a complete integration. This article offers an architecture design of the enterprise hospital information system based on the concept of digital neural network system in hospital. It covers all three aspects of integration, and eventually achieves the target of one virtual data center with Enterprise Viewer for users of different roles. The initial implementation of the architecture in the 5-year Digital Hospital Project in Huzhou Central hospital of Zhejiang Province is also described.

  10. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  11. The Secure Information Exchange (SIX) Project at the OPCW

    International Nuclear Information System (INIS)

    Gulay, M.; Milenkovic, G.

    2015-01-01

    The Chemical Weapons Convention (CWC) entered into force in 1997 and the member states of the Organisation for the Prohibition of Chemical Weapons (OPCW) have obligations for making declarations under various articles of the convention. These declarations could contain confidential information and until recently the only mechanism to submit confidential information to the OPCW Technical Secretariat was through physical delivery by the permanent representatives of the member states which introduced delays in the exchange of information in general. In 2012, the Technical Secretariat initiated a strategic project to establish a secure electronic transmission channel that could be used as an alternative option for the exchange of information between the Technical Secretariat and the member states. The Secure Information Exchange (SIX) Project has been given priority by the Director-General and it received support from the member states. A core project team comprising representatives of the main business unit, the office of legal affairs, IT security and implementation teams were established. Following a feasibility study and with continuous communication with the representatives of the member states, the pilot phase of the project was completed successfully in 2013. In the near future, the project will go live and the member states and the Technical Secretariat will benefit from this key initiative. This paper aims to provide an overview of the project: the solution approach, data gathered in order to assess the delays in communication through traditional means, IT security and implementation issues as well as the legal considerations. (author)

  12. Analysis of methods. [information systems evolution environment

    Science.gov (United States)

    Mayer, Richard J. (Editor); Ackley, Keith A.; Wells, M. Sue; Mayer, Paula S. D.; Blinn, Thomas M.; Decker, Louis P.; Toland, Joel A.; Crump, J. Wesley; Menzel, Christopher P.; Bodenmiller, Charles A.

    1991-01-01

    Information is one of an organization's most important assets. For this reason the development and maintenance of an integrated information system environment is one of the most important functions within a large organization. The Integrated Information Systems Evolution Environment (IISEE) project has as one of its primary goals a computerized solution to the difficulties involved in the development of integrated information systems. To develop such an environment a thorough understanding of the enterprise's information needs and requirements is of paramount importance. This document is the current release of the research performed by the Integrated Development Support Environment (IDSE) Research Team in support of the IISEE project. Research indicates that an integral part of any information system environment would be multiple modeling methods to support the management of the organization's information. Automated tool support for these methods is necessary to facilitate their use in an integrated environment. An integrated environment makes it necessary to maintain an integrated database which contains the different kinds of models developed under the various methodologies. In addition, to speed the process of development of models, a procedure or technique is needed to allow automatic translation from one methodology's representation to another while maintaining the integrity of both. The purpose for the analysis of the modeling methods included in this document is to examine these methods with the goal being to include them in an integrated development support environment. To accomplish this and to develop a method for allowing intra-methodology and inter-methodology model element reuse, a thorough understanding of multiple modeling methodologies is necessary. Currently the IDSE Research Team is investigating the family of Integrated Computer Aided Manufacturing (ICAM) DEFinition (IDEF) languages IDEF(0), IDEF(1), and IDEF(1x), as well as ENALIM, Entity

  13. "Information in Context": Co-Designing Workplace Structures and Systems for Organizational Learning

    Science.gov (United States)

    Somerville, Mary M.; Howard, Zaana

    2010-01-01

    Introduction: This paper discusses an "information in context" design project at Auraria Library in Denver, Colorado which aims to collaboratively create organizational structures and communication systems with and for library employees. Method: This action research project is founded within shared leadership, informed learning and…

  14. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  15. Web based concept project for information and communication of monitoring policy and techniques

    International Nuclear Information System (INIS)

    Levy, D. S.; Sordi, G. M. A. A.

    2014-08-01

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  16. Web based concept project for information and communication of monitoring policy and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Levy, D. S.; Sordi, G. M. A. A., E-mail: info@uniprorad.com.br [Instituto de Pesquisas Energeticas e Nucleares / CNEN, Av. Lineu Prestes 2242, Cidade Universitaria, 05508-000 Sao Paulo (Brazil)

    2014-08-15

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  17. Columbia River Coordinated Information System (CIS); Data Catalog, 1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Dick (Washington Department of Fisheries, Olympia, WA); Allen, Stan; Reece, Doug (Idaho Department of Fish and Game, Boise, ID)

    1993-05-01

    The Columbia River Coordinated Information system (CIS) Project started in 1989 to address regional data sharing. Coordinated exchange and dissemination of any data must begin with dissemination of information about those data, such as: what is available; where the data are stored; what form they exist in; who to contact for further information or access to these data. In Phase II of this Project (1991), a Data Catalog describing the contents of regional datasets and less formal data collections useful for system monitoring and evaluation projects was built to improve awareness of their existence. Formal datasets are described in a `Dataset Directory,` while collections of data are Used to those that collect such information in the `Data Item Directory.` The Data Catalog will serve regional workers as a useful reference which centralizes the institutional knowledge of many data contacts into a single source. Recommendations for improvement of the Catalog during Phase III of this Project include addressing gaps in coverage, establishing an annual maintenance schedule, and loading the contents into a PC-based electronic database for easier searching and cross-referencing.

  18. Environmental Information System Baden-Wuerttemberg, RIPS 2016. Spatial information and planning system

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Czommer, Olaf; Ellmenreich, Bastian

    2016-01-01

    The Spatial Information and Planning System (RIPS), as the overarching component of the Environmental Information System Baden-Wuerttemberg (UIS BW), implements the environmental and nature conservation-specific geoinformation-related requirements taking into account applicable framework conditions. To this end, RIPS offers tailor-made services on the basis of a standardized and in transnational cooperation developed technical kit for the areas of geodata processing and management as well as the development and provision of software components with geo-functions and geodata services as part of the technical and information procedures. The coordination and steering takes place via project development offices, working groups and committees in close coordination with the departments of environmental and nature conservation administration as well as further cooperation and in coordination with other specialist administrations. Taking into account changed framework conditions and new geo-referenced requirements in UIS BW, the present RIPS concept focuses on future-oriented geofunction and geodata management in the field of environmental and nature conservation management as well as the provision of geo-specialized environmental and nature conservation data for policy makers, administrators and the public on innovative technologies Applications and Services. [de

  19. Hypertext and hypermedia systems in information retrieval

    Science.gov (United States)

    Kaye, K. M.; Kuhn, A. D.

    1992-01-01

    This paper opens with a brief history of hypertext and hypermedia in the context of information management during the 'information age.' Relevant terms are defined and the approach of the paper is explained. Linear and hypermedia information access methods are contrasted. A discussion of hyperprogramming in the handling of complex scientific and technical information follows. A selection of innovative hypermedia systems is discussed. An analysis of the Clinical Practice Library of Medicine NASA STI Program hypermedia application is presented. The paper concludes with a discussion of the NASA STI Program's future hypermedia project plans.

  20. The impacts of smart cards on hospital information systems--an investigation of the first phase of the national health insurance smart card project in Taiwan.

    Science.gov (United States)

    Liu, Chien-Tsai; Yang, Pei-Tun; Yeh, Yu-Ting; Wang, Bin-Long

    2006-02-01

    To investigate the impacts of the first phase of Taiwan's Bureau of National Health Insurance (TBNHI) smart card project on existing hospital information systems. TBNHI has launched a nationwide project for replacement of its paper-based health insurance cards by smart cards (or NHI-IC cards) since November 1999. The NHI-IC cards have been used since 1 July 2003, and they have fully replaced the paper-based cards since 1 January 2004. Hospitals must support the cards in order to provide medical services for insured patients. We made a comprehensive study of the current phase of the NHI-IC card system, and conducted a questionnaire survey (from 1 October to 30 November, 2003) to investigate the impacts of NHI-IC cards on the existing hospital information systems. A questionnaire was distributed by mail to 479 hospitals, including 23 medical centers, 71 regional hospitals, and 355 district hospitals. The returned questionnaires were also collected by prepaid mail. The questionnaire return rates of the medical centers, regional hospitals and district hospitals were 39.1, 29.6 and 20.9%, respectively. In phase 1 of the project, the average number of card readers purchased per medical center, regional hospital, and district hospital were 202, 45 and 10, respectively. The average person-days for the enhancement of existing information systems of a medical center, regional hospital and district hospital were 175, 74 and 58, respectively. Three months after using the NHI-IC cards most hospitals (60.6%) experienced prolonged service time for their patients due to more interruptions caused mainly by: (1) impairment of the NHI-IC cards (31.2%), (2) failure in authentication of the SAMs (17.0%), (3) malfunction in card readers (15.3%) and (4) problems with interfaces between the card readers and hospital information systems (15.8%). The overall hospital satisfaction on the 5-point Likert scale was 2.86. Although most hospitals were OK with the project, there was about 22

  1. Assessing the maturity and re-usability of NASA's Advanced Information System Technology (AIST) Projects

    Science.gov (United States)

    Little, M. M.; Hines, K.

    2016-12-01

    Considerable funding has been invested in Earth science information technology (IT) projects by NASA over the past 15 years. While many of these projects succeeded at completing their objectives, rapid improvements in technology and growth in available data could further enhance the capabilities available to the Earth science community. Independent evaluation of these projects has become more and more important. Not only do they qualify the maturity of the work, but they give potential adopters the chance to kick the tires. One approach that has been used is to task Federally Funded Research and Development Corporations (FFRDC) with reviews and paper studies. Another approach involves field testing by third parties. Over the past three years, the AIST Program has tried both. This paper will describe both approaches and lessons learned from the experiences. The audience will be asked for their suggestions as to how to qualify and value these results.

  2. Multidisciplinary approach to successful implementation of production information system (PRISM)

    Energy Technology Data Exchange (ETDEWEB)

    Shariff, M.R.; Gopalakrishnan, S.G.; Francis, N. [and others

    1995-12-31

    A company wide corporate and regional production database supporting all production areas was envisaged critical to the current expansion within Petronas Carigali Sdn Bhd (PCSB). A multi disciplinary project team was thus formed to analyze the requirements prior to developing, testing, implementing and training users. PCSB has currently evolved into a mature E & P company on par with other E & P companies within the region. This expansion necessitates a common Production Information System for the efficient dissemination of vital Production Information for Production Surveillance, Reservoir Management, Reserve Assessment, Special Studies and Standardized Group-wide Reporting. This paper will discuss all the phases involved in the project which includes Systems Requirement Study, Data Migration, System Development, System Implementation and Post-Implementation Plan.

  3. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  4. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  5. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    Energy Technology Data Exchange (ETDEWEB)

    Girolami, Davide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-17

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  6. The AMMA information system

    Science.gov (United States)

    Fleury, Laurence; Brissebrat, Guillaume; Boichard, Jean-Luc; Cloché, Sophie; Mière, Arnaud; Moulaye, Oumarou; Ramage, Karim; Favot, Florence; Boulanger, Damien

    2015-04-01

    In the framework of the African Monsoon Multidisciplinary Analyses (AMMA) programme, several tools have been developed in order to boost the data and information exchange between researchers from different disciplines. The AMMA information system includes (i) a user-friendly data management and dissemination system, (ii) quasi real-time display websites and (iii) a scientific paper exchange collaborative tool. The AMMA information system is enriched by past and ongoing projects (IMPETUS, FENNEC, ESCAPE, QweCI, ACASIS, DACCIWA...) addressing meteorology, atmospheric chemistry, extreme events, health, adaptation of human societies... It is becoming a reference information system on environmental issues in West Africa. (i) The projects include airborne, ground-based and ocean measurements, social science surveys, satellite data use, modelling studies and value-added product development. Therefore, the AMMA data portal enables to access a great amount and a large variety of data: - 250 local observation datasets, that cover many geophysical components (atmosphere, ocean, soil, vegetation) and human activities (agronomy, health). They have been collected by operational networks since 1850, long term monitoring research networks (CATCH, IDAF, PIRATA...) and intensive scientific campaigns; - 1350 outputs of a socio-economics questionnaire; - 60 operational satellite products and several research products; - 10 output sets of meteorological and ocean operational models and 15 of research simulations. Data documentation complies with metadata international standards, and data are delivered into standard formats. The data request interface takes full advantage of the database relational structure and enables users to elaborate multicriteria requests (period, area, property, property value…). The AMMA data portal counts about 900 registered users, and 50 data requests every month. The AMMA databases and data portal have been developed and are operated jointly by SEDOO and

  7. A Pedagogical Approach toward Teaching an Information Systems Student How to Conduct a Web Usability Study for an Honors Project: A Case Study

    Science.gov (United States)

    Jesse, Gayle

    2013-01-01

    The purpose of this paper is to provide educators with a course model and pedagogy to teach a computer information systems usability course. This paper offers a case study based on an honors student project titled "Web Usability: Phases of Developing an Interactive Event Database." Each individual phase--creating a prototype along with…

  8. APPLICATION OF OLAP SYSTEM IN INFORMATION SUB-SYSTEM OF QMS INCOSISTENCY ANALYSIS

    Directory of Open Access Journals (Sweden)

    Alempije Veljovic

    2008-03-01

    Full Text Available Records of inconsistencies arise as a result of incompliance of certain requirements during the execution of the process for the quality management system (QMS functioning. In this study, the established connection between QMS and projected information sub-system for inconsistencies management is presented. The information model of inconsistencies management provides a possibility to analyse inconsistencies from the aspect of interactive analytical data processing (OLAPsystems on the basis of multi-dimensional tables (OLAPcubes created in MSSQL Server-Analysis Services programme.

  9. Tight integration of computerized procedures with plant information at the South Texas Project

    International Nuclear Information System (INIS)

    Brtis, J.S.; Green, T.

    1996-01-01

    This paper describes a unique undertaking that is underway at Houston Lighting and Power's South Texas Project (STP). The paper presents an information upgrade project that uses expert system technologies to computerize design change procedures and to tightly integrate the resulting on-line, interactive procedures with the on-line information that design change activities use and generate. This effort will show how procedure computerization can leverage the large investments in plant data. The expected benefits include reduced costs and improved quality of design change work, plus a significant reduction in the burden of configuration management that comes from design changes. Both process computerization and the integration of process with data are being implemented at STP. This work is part of a major migration of information from a mainframe to a LAN platform. This paper will be of greatest interest to those involved in: (1) configuration management, (2) coordinating information to support design change procedures, (3) plant information management, and (4) business process reengineering

  10. A Systems Perspective on Volunteered Geographic Information

    Directory of Open Access Journals (Sweden)

    Victoria Fast

    2014-12-01

    Full Text Available Volunteered geographic information (VGI is geographic information collected by way of crowdsourcing. However, the distinction between VGI as an information product and the processes that create VGI is blurred. Clearly, the environment that influences the creation of VGI is different than the information product itself, yet most literature treats them as one and the same. Thus, this research is motivated by the need to formalize and standardize the systems that support the creation of VGI. To this end, we propose a conceptual framework for VGI systems, the main components of which—project, participants, and technical infrastructure—form an environment conducive to the creation of VGI. Drawing on examples from OpenStreetMap, Ushahidi, and RinkWatch, we illustrate the pragmatic relevance of these components. Applying a system perspective to VGI allows us to better understand the components and functionality needed to effectively create VGI.

  11. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    The pattern of information flow through the network of interdependent design activities is thought to be an important determinant of engineering design process results. A previously unexplored aspect of such patterns relates to the temporal dynamics of information transfer between activities...... design process and thus support theory-building toward the evolution of information flows through systems engineering stages. Implications include guidance on how to analyze and predict information flows as well as better planning of information flows in engineering design projects according...

  12. Process system of radiometric and magnetometric aerial information

    International Nuclear Information System (INIS)

    Bazua Rueda, L.F.

    1985-01-01

    The author has been working first in the National Institute of Nuclear Energy (Mexico) and then in URAMEX (Uranio Mexicano) since 1975 to 1983, integrated to radiometric and magnetometric aerial prospecting projects in computerized processing of information aspects. During this period the author participated in the work out of computing systems, information processing and mathematical procedures definition for the geophysical reduction of the calibration equipment data. With cumulated experience, in this thesis are presented aspects concerning to management and operation of computerized processing of information systems. Operation handbooks of the majority of modules are presented. Program lists are not included. (Author)

  13. Promoting system-level learning from project-level lessons

    Energy Technology Data Exchange (ETDEWEB)

    Jong, Amos A. de, E-mail: amosdejong@gmail.com [Innovation Management, Utrecht (Netherlands); Runhaar, Hens A.C., E-mail: h.a.c.runhaar@uu.nl [Section of Environmental Governance, Utrecht University, Utrecht (Netherlands); Runhaar, Piety R., E-mail: piety.runhaar@wur.nl [Organisational Psychology and Human Resource Development, University of Twente, Enschede (Netherlands); Kolhoff, Arend J., E-mail: Akolhoff@eia.nl [The Netherlands Commission for Environmental Assessment, Utrecht (Netherlands); Driessen, Peter P.J., E-mail: p.driessen@geo.uu.nl [Department of Innovation and Environment Sciences, Utrecht University, Utrecht (Netherlands)

    2012-02-15

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This 'indirect' learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, 'indirect' learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, 'indirect' learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better

  14. Promoting system-level learning from project-level lessons

    International Nuclear Information System (INIS)

    Jong, Amos A. de; Runhaar, Hens A.C.; Runhaar, Piety R.; Kolhoff, Arend J.; Driessen, Peter P.J.

    2012-01-01

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This ‘indirect’ learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, ‘indirect’ learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, ‘indirect’ learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better information

  15. Vulnerability in Determining the Cost of Information System Project to Avoid Loses

    Science.gov (United States)

    Haryono, Kholid; Ikhsani, Zulfa Amalia

    2018-03-01

    Context: This study discusses the priority of cost required in software development projects. Objectives: To show the costing models, the variables involved, and how practitioners assess and decide the priorities of each variable. To strengthen the information, each variable also confirmed the risk if ignored. Method: The method is done by two approaches. First, systematic literature reviews to find the models and variables used to decide the cost of software development. Second, confirm and take judgments about the level of importance and risk of each variable to the software developer. Result: Obtained about 54 variables that appear on the 10 models discussed. The variables are categorized into 15 groups based on the similarity of meaning. Each group becomes a variable. Confirmation results with practitioners on the level of importance and risk. It shown there are two variables that are considered very important and high risk if ignored. That is duration and effort. Conclusion: The relationship of variable rates between the results of literature studies and confirmation of practitioners contributes to the use of software business actors in considering project cost variables.

  16. Regulatory authority information system RAIS

    International Nuclear Information System (INIS)

    Ortiz, P.; Mrabit, K.; Miaw, S.

    2000-01-01

    In this lecture the principles of the regulatory authority information system (RAIS) are presented. RAIS is a tool currently being developed by the IAEA for the Regulatory Authorities. It is a part of a set of supporting actions designed to assist member states in achieving the objectives of the Model project on radiation and waste safety infrastructure. RAIS is a tool that provides the management of the Regulatory Authority with the key information needed for the planning and implementation of activities and to ensure confidence that resources are optimally used. The RAIS contains five modules: Inventory of installations and radiation sources; Authorization process; Inspection and follow-up actions; Information on personal dosimetry; Assessment of effectiveness by means of performance indicators

  17. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Systems Integration and Operationalization (SIO) Demonstration

    Science.gov (United States)

    Swieringa, Kurt

    2018-01-01

    The UAS-NAS Project hosted a Systems Integration Operationalization (SIO) Industry Day for the SIO Request for Information (RFI) on November 30, 2017 in San Diego, California. This presentation is being presented to the same group as a follow up regarding the progress that the UAS-NAS project has made on the SIO RFI. The presentation will be virtual with a teleconference

  18. System Engineering Analysis For Improved Scout Business Information Systems

    Energy Technology Data Exchange (ETDEWEB)

    Van Slyke, D. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-01-30

    The project uses system engineering principles to address the need of Boy Scout leaders for an integrated system to facilitate advancement and awards records, leader training and planning for meetings and activities. Existing products to address needs of Scout leaders and relevant stakeholders function to support record keeping and some communication functions but opportunity exists for a better system to fully integrate these functions with training delivery and recording, activity planning along with feedback and information gathering from stakeholders. Key stakeholders for the sytem include Scouts and their families, leaders, training providers, sellers of supplies and awards, content generators and facilities that serve Scout activities. Key performance parameters for the system are protection of personal information, availability of current information, information accuracy and information content that has depth. Implementation concepts considered for the system include (1) owned and operated by Boy Scouts of America, (2) Contracted out to a vendor (3) distributed system that functions with BSA managed interfaces. The selected concept is to contract out to a vendor to maximize the likelihood of successful integration and take advantage of the best technology. Development of requirements considers three key use cases (1) System facilitates planning a hike with training needed satisfied in advance and advancement recording real time (2) Scheduling and documenting in-person training, (3) Family interested in Scouting receives information and can request follow-up. Non-functional requirements are analyzed with the Quality Function Deployment tool. Requirement addressing frequency of backup, compatibility with legacy and new technology, language support, software update are developed to address system reliability and intuitive interface. System functions analyzed include update of activity database, maintenance of advancement status, archive of documents, and

  19. SUCCESS CONCEPT ANALYSIS APPLIED TO THE INFORMATION TECHNOLOGY PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cassio C. Montenegro Duarte

    2012-05-01

    Full Text Available This study evaluates the concept of success in project management that is applicable to the IT universe, from the classical theory associated with the techniques of project management. Therefore, it applies the theoretical analysis associated to the context of information technology in enterprises as well as the classic literature of traditional project management, focusing on its application in business information technology. From the literature developed in the first part of the study, four propositions were prepared for study which formed the basis for the development of the field research with three large companies that develop projects of Information Technology. The methodology used in the study predicted the development of the multiple case study. Empirical evidence suggests that the concept of success found in the classical literature in project management adjusts to the environment management of IT projects. Showed that it is possible to create the model of standard IT projects in order to replicate it in future derivatives projects, which depends on the learning acquired at the end of a long and continuous process and sponsorship of senior management, which ultimately results in its merger into the company culture.

  20. The nuclear criticality information system's project to archive unpublished critical experiment data

    International Nuclear Information System (INIS)

    Koponen, B.L.; Doherty, A.L.; Clayton, E.D.

    1991-01-01

    Critical experiment facilities produced a large amount of important data during the past forty-five years. However, much useful data remains unpublished. The unpublished material exists in the form of experimenters' logbooks, notes, photographs, material descriptions, etc. These data could be important for computer code validation, understanding the physics of criticality, facility design, or for setting process limits. In the past, criticality specialists have been able to obtain unpublished details by direct contact with the experimenters. The closure of facilities and the loss of personnel is likely to lead to the loss of the facility records unless an effort is made to ensure that the records are preserved. It has been recognized for some time that the unpublished records of critical experiment facilities comprise a valuable resource, thus the Nuclear Criticality Information System (NCIS) is working to ensure that the records are preserved and made available via NCIS. As a first step in the archiving project, we identified criteria to help judge which series of experiments should be considered for archiving. Data that are used for validating calculations or the basis for subcritical limits in standards, handbooks, and guides are of particular importance. In this paper we will discuss the criteria for archiving, the priority list of experiments for archiving, and progress in developing an NCIS image database using current CD-ROM technology. (Author)

  1. Information dissemination and training: two key issues for consolidating and strengthening the results of health telematic projects.

    Science.gov (United States)

    Arcarese, T; Boi, S; Gagliardi, R

    2000-01-01

    The concepts expressed in this paper concerns the activities to be developed within HEALTHLINE, a European project under the Telematics Application programme. HEALTHLINE is an umbrella project which takes initiatives and provides links to other international projects on health telematics. The projects involved are NIVEMES and RISE; they represent the starting point from which a common approach will be developed. The experience gained from these projects has highlighted two emerging requirements: information dissemination and training. To fulfil the needs of information, an Internet corner will be set up; it will allow citizens and health professionals to find and exchange information as well as to discuss themes concerning health care. Due to the most advanced technologies recently introduced, the Health care sector has had to modify its traditional ways of working to aid professionals in exploiting new training techniques and Health Care provision methods. HEALTHLINE will focus on training and on the development of the use of new tools and services. Furthermore, the project will exploit the training methodologies based on multimedia technology for developing training-on-the-job modules. The entire system, in its final stage, will consist of a network for co-operating training and information dissemination; European sites in the project will share information, training material and provide education and information on tele-health, medical and health-care issues to health care providers, beneficiaries and the general public.

  2. Systems Book for a Student Information System. End of Project Report, 1968-1971, Volume II.

    Science.gov (United States)

    Western Nevada Regional Education Center, Lovelock.

    The necessary handbooks for use of the Student Information System (SIS), developed and tested by the Western Nevada Regional Education Center under a 1968-71 Title III (Elementary and Secondary Education Act) grant, are presented in this volume. As noted, the purpose of the SIS is to supply data and information to persons or organizations who make…

  3. Liquid Effluent Monitoring Information System test plans release 1.2

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  4. Multi-Modal Traveler Information System - GCM Corridor Architecture Functional Requirements

    Science.gov (United States)

    1997-11-17

    The Multi-Modal Traveler Information System (MMTIS) project involves a large number of Intelligent Transportation System (ITS) related tasks. It involves research of all ITS initiatives in the Gary-Chicago-Milwaukee (GCM) Corridor which are currently...

  5. Management Information System Project. Data Processors Manual to the Program Oriented Accounting System: The Budgetary Process.

    Science.gov (United States)

    Foley, Walter; Harr, Gordon

    The purpose of this manual is to serve the needs of a data processing facility in the operation of a management information system (MIS). Included in the manual are system flowcharts, job control language, and system documentation. The system has been field tested and operates under IBM System 360/Model 65-05-MVT-HASP. The programing language is…

  6. High-level-waste records management system: the NRC pilot project

    International Nuclear Information System (INIS)

    Bender, A.; Altomare, P.

    1987-01-01

    The US Nuclear Regulatory Commission (NRC) and the US Dept. of Energy (DOE) have agreed to develop a licensing support system (LSS) to address the records management requirements created by the Nuclear Waste Policy Act (NWPA). The NRC is planning to conduct a negotiated rule making the modify 10CFR2, including rules governing discovery, so that parties to the licensing process will use a single information management system as a source for all licensing-related documents. The successful demonstration of the pilot project has resulted in an operational on-line record management system for NRC-related HLW documents. Both incoming and outgoing documents are being scanned and stored on a mainframe system and on an optical disk. At this writing the optical disk portion of the system is being tested to evaluate its potential use as a future archival and distribution medium for licensing records. Experience gained from this project is being shared with other government agencies that are in the process of using similar technologies to come to grips with the complex records management problem endemic to our information-based society

  7. Asan medical information system for healthcare quality improvement.

    Science.gov (United States)

    Ryu, Hyeon Jeong; Kim, Woo Sung; Lee, Jae Ho; Min, Sung Woo; Kim, Sun Ja; Lee, Yong Su; Lee, Young Ha; Nam, Sang Woo; Eo, Gi Seung; Seo, Sook Gyoung; Nam, Mi Hyun

    2010-09-01

    This purpose of this paper is to introduce the status of the Asan Medical Center (AMC) medical information system with respect to healthcare quality improvement. Asan Medical Information System (AMIS) is projected to become a completely electronic and digital information hospital. AMIS has played a role in improving the health care quality based on the following measures: safety, effectiveness, patient-centeredness, timeliness, efficiency, privacy, and security. AMIS CONSISTED OF SEVERAL DISTINCTIVE SYSTEMS: order communication system, electronic medical record, picture archiving communication system, clinical research information system, data warehouse, enterprise resource planning, IT service management system, and disaster recovery system. The most distinctive features of AMIS were the high alert-medication recognition & management system, the integrated and severity stratified alert system, the integrated patient monitoring system, the perioperative diabetic care monitoring and support system, and the clinical indicator management system. AMIS provides IT services for AMC, 7 affiliated hospitals and over 5,000 partners clinics, and was developed to improve healthcare services. The current challenge of AMIS is standard and interoperability. A global health IT strategy is needed to get through the current challenges and to provide new services as needed.

  8. Teaching Information Systems Development via Process Variants

    Science.gov (United States)

    Tan, Wee-Kek; Tan, Chuan-Hoo

    2010-01-01

    Acquiring the knowledge to assemble an integrated Information System (IS) development process that is tailored to the specific needs of a project has become increasingly important. It is therefore necessary for educators to impart to students this crucial skill. However, Situational Method Engineering (SME) is an inherently complex process that…

  9. The coordinate transforming in geography information system

    International Nuclear Information System (INIS)

    Zhao Xiang; Chen Gang

    2003-01-01

    The coordinate transforming of geography information system includes two kinds of transforming, map projection and coordinate-transforming. This paper proposed a arithmetic of coordinate-transforming, it implement the transforming between the longitude-latitude coordinate and the screen coordinate and apply it in the GIS. The preferable effect was made. (authors)

  10. Evaluation system of Research and Development projects and services from ININ

    International Nuclear Information System (INIS)

    Reglero, R.

    1994-01-01

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author)

  11. Leadership Styles: Perceptions in Information Technology Project Teams

    Science.gov (United States)

    Fune, Roy P.

    2013-01-01

    The purpose of this study was to uncover Information Technology (IT) Project Managers' and IT Professionals' perceptions of effective leadership styles as they apply to project success. There have been prior studies dealing with the differences in perceptions between IT Functional Manager's leadership self-perception versus staff perceptions of…

  12. Biodiversity information system of the national parks administration of Argentina

    Directory of Open Access Journals (Sweden)

    Leonidas Lizarraga

    2014-06-01

    Full Text Available Introduction The Biodiversity Information System (BIS of the National Parks Administration of Argentina (NPA was launched in 2002, with the support of the Global Environmental Fund (GEF through the Biodiversity Conservation Project in Argentina. The BIS consists of a set of thematic databases and Geographic Information System (GIS set to support management decisions, and to provide information to the general public on the national protected areas of Argentina. Currently, the BIS-NPA progr...

  13. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  14. System design description for Waste Information and Control System

    International Nuclear Information System (INIS)

    Harris, R.R.

    1994-01-01

    The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as the Waste Information and Control System (WICS). WICS shall partially automate the procedure for acquisition, tracking and reporting of the container, drum, and waste data that is currently manually processed. The WICS project shall use handheld computer units (HCU) to collect laboratory data, a local database with an user friendly interface to import the laboratory data from the HCUs, and barcode technology with associated software and operational procedures. After the container, drum, and waste data has been collected and verified, WICS shall be manipulated to provide informal reports containing data required to properly document waste disposal. 8 refs, 82 figs, 69 tabs

  15. Complex New Product Development projects - How the Project Manager’s Information Sharing With Core Actors Changes Over Time

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde

    2013-01-01

    A heavily burdened project manager must ensure effective information sharing with actors inside and outside the organization because this is a necessary condition for a new product development (NPD) project to achieve its objectives. Knowledge, however, on who actually assists a project manager...... with the information sharing during NPD projects is limited; therefore, this study of longitudinal objective email data (4658 emails) during a NPD project contributes to theory and practice by advancing our understanding of when and how the project manager establishes relationships with different core actors inside...

  16. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  17. Recording information on protein complexes in an information management system.

    Science.gov (United States)

    Savitsky, Marc; Diprose, Jonathan M; Morris, Chris; Griffiths, Susanne L; Daniel, Edward; Lin, Bill; Daenke, Susan; Bishop, Benjamin; Siebold, Christian; Wilson, Keith S; Blake, Richard; Stuart, David I; Esnouf, Robert M

    2011-08-01

    The Protein Information Management System (PiMS) is a laboratory information management system (LIMS) designed for use with the production of proteins in a research environment. The software is distributed under the CCP4 licence, and so is available free of charge to academic laboratories. Like most LIMS, the underlying PiMS data model originally had no support for protein-protein complexes. To support the SPINE2-Complexes project the developers have extended PiMS to meet these requirements. The modifications to PiMS, described here, include data model changes, additional protocols, some user interface changes and functionality to detect when an experiment may have formed a complex. Example data are shown for the production of a crystal of a protein complex. Integration with SPINE2-Complexes Target Tracker application is also described. Copyright © 2011 Elsevier Inc. All rights reserved.

  18. INFORMATION SYSTEM OF AUTOMATION OF PREPARATION EDUCATIONAL PROCESS DOCUMENTS

    Directory of Open Access Journals (Sweden)

    V. A. Matyushenko

    2016-01-01

    Full Text Available Information technology is rapidly conquering the world, permeating all spheres of human activity. Education is not an exception. An important direction of information of education is the development of university management systems. Modern information systems improve and facilitate the management of all types of activities of the institution. The purpose of this paper is development of system, which allows automating process of formation of accounting documents. The article describes the problem of preparation of the educational process documents. Decided to project and create the information system in Microsoft Access environment. The result is four types of reports obtained by using the developed system. The use of this system now allows you to automate the process and reduce the effort required to prepare accounting documents. All reports was implement in Microsoft Excel software product and can be used for further analysis and processing.

  19. Progress Scored in Management Information System at CAS

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ CAS initiative to upgrade its management information system (MIS) is making significant progress. Recently, 116 CAS subordinates have completed their online trial operation of a MIS project at the Academy, called Academia Resource Planning (ARP), marking an important phased achievement of the initiative.

  20. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  1. Earth Observing Data System Data and Information System (EOSDIS) Overview

    Science.gov (United States)

    Klene, Stephan

    2016-01-01

    The National Aeronautics and Space Administration (NASA) acquires and distributes an abundance of Earth science data on a daily basis to a diverse user community worldwide. The NASA Big Earth Data Initiative (BEDI) is an effort to make the acquired science data more discoverable, accessible, and usable. This presentation will provide a brief introduction to the Earth Observing System Data and Information System (EOSDIS) project and the nature of advances that have been made by BEDI to other Federal Users.

  2. TxDOT's pavement management information system : current status and future directions

    Science.gov (United States)

    1997-12-01

    Phase 2 focuses on improving The Texas Pavement Management Information System (PMIS) implementation at the district level, the goal being to provide sufficient information to move from network to project level decision making. Phase 2 implementation ...

  3. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    Science.gov (United States)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  4. User-led approach to information system investments

    International Nuclear Information System (INIS)

    Pferd, J.W.; Fuller, A.G.

    1992-01-01

    Information system (IS) expenditures for upstream E and P have come under strong review along with other overhead expenses. Increasing frustration with IS budgets and concern about their business value have led Unocal to change the way it starts, manages and implements IS projects. Successful IS investments are aligned with the goals and functions of work groups and are balanced against other investments. The twin axes of business need and technical excellence must be served together to fully achieve successful IS investments. This paper describes project organizations and methods to achieve these dual objectives

  5. Implementing a regional oncology information system: approach and lessons learned.

    Science.gov (United States)

    Evans, W K; Ashbury, F D; Hogue, G L; Smith, A; Pun, J

    2014-10-01

    Paper-based medical record systems are known to have major problems of inaccuracy, incomplete data, poor accessibility, and challenges to patient confidentiality. They are also an inefficient mechanism of record-sharing for interdisciplinary patient assessment and management, and represent a major problem for keeping current and monitoring quality control to facilitate improvement. To address those concerns, national, regional, and local health care authorities have increased the pressure on oncology practices to upgrade from paper-based systems to electronic health records. Here, we describe and discuss the challenges to implementing a region-wide oncology information system across four independent health care organizations, and we describe the lessons learned from the initial phases that are now being applied in subsequent activities of this complex project. The need for change must be shared across centres to increase buy-in, adoption, and implementation. It is essential to establish physician leadership, commitment, and engagement in the process. Work processes had to be revised to optimize use of the new system. Culture change must be included in the change management strategy. Furthermore, training and resource requirements must be thoroughly planned, implemented, monitored, and modified as required for effective adoption of new work processes and technology. Interfaces must be established with multiple existing electronic systems across the region to ensure appropriate patient flow. Periodic assessment of the existing project structure is necessary, and adjustments are often required to ensure that the project meets its objectives. The implementation of region-wide oncology information systems across different health practice locations has many challenges. Leadership is essential. A strong, collaborative information-sharing strategy across the region and with the supplier is essential to identify, discuss, and resolve implementation problems. A structure

  6. Innovations and Advances in Computer, Information, Systems Sciences, and Engineering

    CERN Document Server

    Sobh, Tarek

    2013-01-01

    Innovations and Advances in Computer, Information, Systems Sciences, and Engineering includes the proceedings of the International Joint Conferences on Computer, Information, and Systems Sciences, and Engineering (CISSE 2011). The contents of this book are a set of rigorously reviewed, world-class manuscripts addressing and detailing state-of-the-art research projects in the areas of  Industrial Electronics, Technology and Automation, Telecommunications and Networking, Systems, Computing Sciences and Software Engineering, Engineering Education, Instructional Technology, Assessment, and E-learning.

  7. Gulf of Mexico Integrated Science - Tampa Bay Study - Data Information Management System (DIMS)

    Science.gov (United States)

    Johnston, James

    2004-01-01

    The Tampa Bay Integrated Science Study is an effort by the U.S. Geological Survey (USGS) that combines the expertise of federal, state and local partners to address some of the most pressing ecological problems of the Tampa Bay estuary. This project serves as a template for the application of integrated research projects in other estuaries in the Gulf of Mexico. Efficient information and data distribution for the Tampa Bay Study has required the development of a Data Information Management System (DIMS). This information system is being used as an outreach management tool, providing information to scientists, decision makers and the public on the coastal resources of the Gulf of Mexico.

  8. Action Information Management System (AIMS): a User's View

    Science.gov (United States)

    Wiskerchen, M.

    1984-01-01

    The initial approach used in establishing a user-defined information system to fulfill the needs of users at NASA Headquarters was unsuccessful in bringing this pilot endeaveor to full project status. The persistence of several users and the full involvement of the Ames Research Center were the ingredients needed to make the AIMS project a success. The lesson learned from this effort is that NASA should always work from its organizational strengths as a Headquarters-Center partnership.

  9. Development of a Carbon Management Geographic Information System (GIS) for the United States

    Energy Technology Data Exchange (ETDEWEB)

    Howard Herzog; Holly Javedan

    2009-12-31

    In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Cost Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.

  10. National Carbon Sequestration Database and Geographic Information System (NatCarb)

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth Nelson; Timothy Carr

    2009-03-31

    This annual and final report describes the results of the multi-year project entitled 'NATional CARBon Sequestration Database and Geographic Information System (NatCarb)' (http://www.natcarb.org). The original project assembled a consortium of five states (Indiana, Illinois, Kansas, Kentucky and Ohio) in the midcontinent of the United States (MIDCARB) to construct an online distributed Relational Database Management System (RDBMS) and Geographic Information System (GIS) covering aspects of carbon dioxide (CO{sub 2}) geologic sequestration. The NatCarb system built on the technology developed in the initial MIDCARB effort. The NatCarb project linked the GIS information of the Regional Carbon Sequestration Partnerships (RCSPs) into a coordinated regional database system consisting of datasets useful to industry, regulators and the public. The project includes access to national databases and GIS layers maintained by the NatCarb group (e.g., brine geochemistry) and publicly accessible servers (e.g., USGS, and Geography Network) into a single system where data are maintained and enhanced at the local level, but are accessed and assembled through a single Web portal to facilitate query, assembly, analysis and display. This project improves the flow of data across servers and increases the amount and quality of available digital data. The purpose of NatCarb is to provide a national view of the carbon capture and storage potential in the U.S. and Canada. The digital spatial database allows users to estimate the amount of CO{sub 2} emitted by sources (such as power plants, refineries and other fossil-fuel-consuming industries) in relation to geologic formations that can provide safe, secure storage sites over long periods of time. The NatCarb project worked to provide all stakeholders with improved online tools for the display and analysis of CO{sub 2} carbon capture and storage data through a single website portal (http://www.natcarb.org/). While the external

  11. Geographic information systems, remote sensing, and spatial analysis activities in Texas, 2008-09

    Science.gov (United States)

    ,

    2009-01-01

    Geographic information system (GIS) technology has become an important tool for scientific investigation, resource management, and environmental planning. A GIS is a computer-aided system capable of collecting, storing, analyzing, and displaying spatially referenced digital data. GIS technology is useful for analyzing a wide variety of spatial data. Remote sensing involves collecting remotely sensed data, such as satellite imagery, aerial photography, or radar images, and analyzing the data to gather information or investigate trends about the environment or the Earth's surface. Spatial analysis combines remotely sensed, thematic, statistical, quantitative, and geographical data through overlay, modeling, and other analytical techniques to investigate specific research questions. It is the combination of data formats and analysis techniques that has made GIS an essential tool in scientific investigations. This fact sheet presents information about the technical capabilities and project activities of the U.S. Geological Survey (USGS) Texas Water Science Center (TWSC) GIS Workgroup during 2008 and 2009. After a summary of GIS Workgroup capabilities, brief descriptions of activities by project at the local and national levels are presented. Projects are grouped by the fiscal year (October-September 2008 or 2009) the project ends and include overviews, project images, and Internet links to additional project information and related publications or articles.

  12. Consumer health information partnerships: the health science library and multitype library system.

    Science.gov (United States)

    Hollander, S

    1996-04-01

    The University of Illinois Library of the Health Sciences at Rockford (LHS-Rockford) long has honored a commitment to serving the health information needs of the greater Rockford community. Utilization data collected over the past five years indicate that approximately 50% of reference transactions involve persons not affiliated with the university. In early 1994, LHS-Rockford submitted a proposal to the Northern Illinois Library System (NILS), a multitype system spanning twelve counties in northwestern Illinois, asking to serve as a resource library for improving medical and health information services provided by the 138 NILS member libraries. The NILS funded this pilot project as part of an effort to implement a new strategic plan, which encouraged member libraries to form networks to provide reference back-up service. LHS-Rockford acquired InfoTrac's Health Reference Center, a consumer health information database, and set up a dedicated workstation near the information and circulation desk. Referral guidelines were established and the project was promoted among NILS member libraries. Activities were documented in order to track project success in terms of referrals and outcomes. The demonstration project was very successful, and it proves public consumers seeking health information can benefit greatly from this type of cooperative arrangement.

  13. River Basin Information System: Open Environmental Data Management for Research and Decision Making

    Directory of Open Access Journals (Sweden)

    Franziska Zander

    2016-07-01

    Full Text Available An open, standardized data management and related service infrastructure is a crucial requirement for a seamless storage and exchange of data and information within research projects, for the dissemination of project results and for their application in decision making processes. However, typical project databases often refer to only one research project and are limited to specific purposes. Once implemented, those systems are often not further maintained and updated, rendering the stored information useless once the system stops operating. The River Basin Information System (RBIS presented here is designed to fit not only the requirements of one research project, but focuses on generic functions, extensibility and standards compliance typically found in interdisciplinary environmental research. Developed throughout more than 10 years of research cooperation worldwide, RBIS is designed to manage different types of environmental data with and without spatial context together with a rich set of metadata. Beside data management and storage, RBIS provides functions for the visualization, linking, analysis and processing of different types of data to support research, decision making, result dissemination and information discovery for all kinds of users. The focus of this paper is on the description of the technical implementation and the presentation of functions. This will be complemented by an overview of example applications and experiences during RBIS development and operation.

  14. The definition, selection and implementation of a new Clinical Information System to prepare the hospital for the electronic future : an example of project-based education

    NARCIS (Netherlands)

    Spil, Antonius A.M.; van de Meeberg, Henk J.; Sikkel, Nicolaas

    The software supplier of a large hospital has been taken over. The hospital gets notice that the central hospital information system (HIS) will no longer be maintained, starting next year. This problem, not uncommon in business today, is used as a real-life case in a project-based course for first

  15. Framework for a comprehensive bridge management and information system.

    Science.gov (United States)

    2011-11-01

    "The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...

  16. An information theoretic model of information processing in the Drosophila olfactory system: the role of inhibitory neurons for system efficiency.

    Science.gov (United States)

    Faghihi, Faramarz; Kolodziejski, Christoph; Fiala, André; Wörgötter, Florentin; Tetzlaff, Christian

    2013-12-20

    Fruit flies (Drosophila melanogaster) rely on their olfactory system to process environmental information. This information has to be transmitted without system-relevant loss by the olfactory system to deeper brain areas for learning. Here we study the role of several parameters of the fly's olfactory system and the environment and how they influence olfactory information transmission. We have designed an abstract model of the antennal lobe, the mushroom body and the inhibitory circuitry. Mutual information between the olfactory environment, simulated in terms of different odor concentrations, and a sub-population of intrinsic mushroom body neurons (Kenyon cells) was calculated to quantify the efficiency of information transmission. With this method we study, on the one hand, the effect of different connectivity rates between olfactory projection neurons and firing thresholds of Kenyon cells. On the other hand, we analyze the influence of inhibition on mutual information between environment and mushroom body. Our simulations show an expected linear relation between the connectivity rate between the antennal lobe and the mushroom body and firing threshold of the Kenyon cells to obtain maximum mutual information for both low and high odor concentrations. However, contradicting all-day experiences, high odor concentrations cause a drastic, and unrealistic, decrease in mutual information for all connectivity rates compared to low concentration. But when inhibition on the mushroom body is included, mutual information remains at high levels independent of other system parameters. This finding points to a pivotal role of inhibition in fly information processing without which the system efficiency will be substantially reduced.

  17. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  18. Experience of the pilot implementation of the european information sharing and alerting system in the field of information security

    Directory of Open Access Journals (Sweden)

    Anatoly A. Malyuk

    2018-03-01

    Full Text Available The formation of a global information society poses a particular challenge to the development of an information security culture. In the Doctrine of Information Security of the Russian Federation, adopted in December 2016, one of the main threats is the low awareness of citizens in matters of ensuring personal information security. One of the most important mechanisms for increasing competence and forming an in-formation security culture, in addition to mass training of people, are methods of propaganda and creation of "hot lines". They allow the general public to take the initiative in monitoring and reporting computer incidents. The development of such approaches should be carried out taking into account the international experience accumulated today. To this end, the article examines the European experience of creating a system of information and advisory assistance in the field of preventing threats to the security of public and corporate information systems, primarily information and telecommunications networks, as well as eliminating the consequences of threats in the information sphere. The analysis of the experience of implementing the pilot project of the European Information Sharing and Alert System has revealed the advisability of designing such systems on the basis of a management model with four players that unites network operators, information producers (who are IT product suppliers or IT security specialists; local information intermediaries and consumers of information. As a model of the information flow, a node can be selected that runs a local web portal that provides information to end users, generates new information, adapts information to the constraints of various distribution channels, and to the characteristics of end-user target groups. The methodology of the pilot project can be used in the design and deployment of a notification and information exchange system aimed at end-users of several regions or countries

  19. Integrating a project monitoring system into a public health network: experiences from Alive & Thrive Vietnam.

    Science.gov (United States)

    Tuan, Nguyen Thanh; Alayon, Silvia; Do, Tran Thanh; Ngan, Tran Thi; Hajeebhoy, Nemat

    2015-01-01

    Little information is available about how to build a monitoring system to measure the output of preventive nutrition interventions, such as counselling on infant and young child feeding. This paper describes the Alive & Thrive Vietnam (A&T) project experience in nesting a large-scale project monitoring system into the existing public health information system (e.g. using the system and resources), and in using monitoring data to strengthen service delivery in 15 provinces with A&T franchises. From January 2012 to April 2014, the 780 A&T franchises provided 1,700,000 counselling contacts (~3/4 by commune franchises). In commune franchises in April 2014, 80% of mothers who were pregnant or with children under two years old had been to the counselling service at least one time, and 87% of clients had been to the service earlier. Monitoring data are used to track the progress of the project, make decisions, provide background for a costing study and advocate for the integration of nutrition counselling indicators into the health information system nationwide. With careful attention to the needs of stakeholders at multiple levels, clear data quality assurance measures and strategic feedback mechanisms, it is feasible to monitor the scale-up of nutrition programmes through the existing routine health information system.

  20. The sustainable IT architecture resilient information systems

    CERN Document Server

    Bonnet, P

    2009-01-01

    This book focuses on Service Oriented Architecture (SOA), the basis of sustainable and more agile IT systems that are able to adapt themselves to new trends and manage processes involving a third party. The discussion is based on the public Praxeme method and features a number of examples taken from large SOA projects which were used to rewrite the information systems of an insurance company; as such, decision-makers, creators of IT systems, programmers and computer scientists, as well as those who will use these new developments, will find this a useful resource

  1. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  2. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  3. Geographic Information Systems-Transportation ISTEA management systems server-net prototype pooled fund study: Phase B summary

    Energy Technology Data Exchange (ETDEWEB)

    Espinoza, J. Jr.; Dean, C.D.; Armstrong, H.M. [and others

    1997-06-01

    The Geographic Information System-Transportation (GIS-T) ISTEA Management Systems Server Net Prototype Pooled Fund Study represents the first national cooperative effort in the transportation industry to address the management and monitoring systems as well as the statewide and metropolitan transportation planning requirements of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The Study was initiated in November 1993 through the Alliance for Transportation Research and under the leadership of the New Mexico State Highway and Transportation Department. Sandia National Laboratories, an Alliance partner, and Geographic Paradigm Computing. Inc. provided technical leadership for the project. In 1992, the Alliance for Transportation Research, the New Mexico State Highway and Transportation Department, Sandia National Laboratories, and Geographic Paradigm Computing, Inc., proposed a comprehensive research agenda for GIS-T. That program outlined a national effort to synthesize new transportation policy initiatives (e.g., management systems and Intelligent Transportation Systems) with the GIS-T server net ideas contained in the NCHRP project {open_quotes}Adaptation of GIS to Transportation{close_quotes}. After much consultation with state, federal, and private interests, a project proposal based on this agenda was prepared and resulted in this Study. The general objective of the Study was to develop GIS-T server net prototypes supporting the ISTEA requirements for transportation planning and management and monitoring systems. This objective can be further qualified to: (1) Create integrated information system architectures and design requirements encompassing transportation planning activities and data. (2) Encourage the development of functional GIS-T server net prototypes. (3) Demonstrate multiple information systems implemented in a server net environment.

  4. Qualitative Phenomenological Study of Data Management Information System Deployments: Financial Services Industry

    Science.gov (United States)

    Kerns, Dannie J.

    2014-01-01

    The qualitative phenomenological study explored the lived experiences of financial services industry change managers to understand the genesis of low data management information system project adoption rates. The goal of the study was to find methods to improve data management information system adoption rates. The participant pool consisted of 19…

  5. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.0

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  6. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.1

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  7. Intelligent Data Analysis in the EMERCOM Information System

    Science.gov (United States)

    Elena, Sharafutdinova; Tatiana, Avdeenko; Bakaev, Maxim

    2017-01-01

    The paper describes an information system development project for the Russian Ministry of Emergency Situations (MES, whose international operations body is known as EMERCOM), which was attended by the representatives of both the IT industry and the academia. Besides the general description of the system, we put forward OLAP and Data Mining-based approaches towards the intelligent analysis of the data accumulated in the database. In particular, some operational OLAP reports and an example of multi-dimensional information space based on OLAP Data Warehouse are presented. Finally, we outline Data Mining application to support decision-making regarding security inspections planning and results consideration.

  8. Multi-Modal Traveler Information System - GCM Corridor Architecture Interface Control Requirements

    Science.gov (United States)

    1997-10-31

    The Multi-Modal Traveler Information System (MMTIS) project involves a large number of Intelligent Transportation System (ITS) related tasks. It involves research of all ITS initiatives in the Gary-Chicago-Milwaukee (GCM) Corridor which are currently...

  9. Decontamination systems information and research program. Quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The projects reported during this period are categorized into the following three areas: 1.0 Site Remediation Technologies, 2.0 Advanced Product Applications Testing, and 3.0 Information Systems, Public Policy, Community Outreach, and Economics. Summaries of the significant accomplishments for the projects reported during this period, are presented.

  10. Information Technology in Engineering and Project Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2017-01-01

    Full Text Available Information Technology (IT can be regarded as the use of computers to store, analyze, and manipulate data (Daintith, 2009. With the rapid development of personal computers, IT has been widely applied in nearly every field (Davenport, 2013. This issue presents five papers covering engineering and project management, three of which focus on the application of IT to solve engineering and project management issues, while one presents research into public private partnerships, and another into cash flow forecasting.

  11. Spiral model pilot project information model

    Science.gov (United States)

    1991-01-01

    The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

  12. Mallik data and information system : development of a scientific data exchange platform

    Energy Technology Data Exchange (ETDEWEB)

    Lowner, R.; Conze, R. [GeoForschungsZentrum Potsdam, Potsdam (Germany)

    2005-07-01

    The Mallik Data and Information System (Mallik DIS) includes 3 main components which make it possible to acquire, integrate and disseminate interdisciplinary data from the Mallik 2002 Gas Hydrate Production Research Well Program. The system provides a secure and accessible archive of quality controlled scientific results of the project. The 3 main components are: (1) a digital scanner which produces a catalogue of digital core images, (2) the data warehouse which is a vital database and archive that provides members of the Mallik team with access to project data sets via Internet, and (3) the web portal of the International Continental Scientific Drilling Program information network which allows the separate data sets to be retrieved, viewed and integrated with other project data sets.

  13. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  14. Disabilities Information Flow: A Disabilities Information Management System

    Science.gov (United States)

    Ling, Bin; Allison, Colin; Nicholl, J. Ross; Moodley, Luke; Roberts, Dave

    2006-01-01

    The Disabilities Information Flow (DIF) project at the University of St Andrews has sought to provide a means of efficiently managing all student disabilities information within the institution and provide appropriate role-based service interfaces for all staff who need to routinely interact with this information. This paper describes the software…

  15. Three-tiered integration of PACS and HIS toward next generation total hospital information system.

    Science.gov (United States)

    Kim, J H; Lee, D H; Choi, J W; Cho, H I; Kang, H S; Yeon, K M; Han, M C

    1998-01-01

    The Seoul National University Hospital (SNUH) started a project to innovate the hospital information facilities. This project includes installation of high speed hospital network, development of new HIS, OCS (order communication system), RIS and PACS. This project aims at the implementation of the first total hospital information system by seamlessly integrating these systems together. To achieve this goal, we took three-tiered systems integration approach: network level, database level, and workstation level integration. There are 3 loops of networks in SNUH: proprietary star network for host computer based HIS, Ethernet based hospital LAN for OCS and RIS, and ATM based network for PACS. They are linked together at the backbone level to allow high speed communication between these systems. We have developed special communication modules for each system that allow data interchange between different databases and computer platforms. We have also developed an integrated workstation in which both the OCS and PACS application programs run on a single computer in an integrated manner allowing the clinical users to access and display radiological images as well as textual clinical information within a single user environment. A study is in progress toward a total hospital information system in SNUH by seamlessly integrating the main hospital information resources such as HIS, OCS, and PACS. With the three-tiered systems integration approach, we could successfully integrate the systems from the network level to the user application level.

  16. DBMS as a Tool for Project Management

    Science.gov (United States)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  17. [Project summarize of "reestablishing disease prevention and control system of China"].

    Science.gov (United States)

    Hao, Mo; Yu, Jingjin; Yu, Mingzhu; Duan, Yong

    2005-01-01

    This paper introduced the project of "reestablishing the disease control and prevention system of China" in brief, including background, objectives, funding resources, researching objects and sampling methods. This project which funded by National Outstanding Younger Fund and the research fund of MOH aimed at nailing down the key problem existed in disease control and prevention system of China, demonstrating the reasons and mechanism of key problem, developing feasible policy idea and strategy. This paper also introduced some issues concerning the reestablishing of the disease control and prevention system of China: the definition of public function, the standard of human resource allocation and the standard of financing. The Centers for Disease Control and Prevention in 8 provinces, 80 cities and 80 counties have been sampled to provide information that project needed. In addition, this project also cited some data which come from the early study, in which 3 provinces, 12 counties, 49 towns, 179 villages and 9781 rural families have been sampled and investigated.

  18. Information retrieval system: impacts of water-level changes on uses of federal storage reservoirs of the Columbia River.

    Energy Technology Data Exchange (ETDEWEB)

    Fickeisen, D.H.; Cowley, P.J.; Neitzel, D.A.; Simmons, M.A.

    1982-09-01

    A project undertaken to provide the Bonneville Power Administration (BPA) with information needed to conduct environmental assessments and meet requirements of the National Environmental Policy Act (NEPA) and the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act) is described. Access to information on environmental effects would help BPA fulfill its responsibilities to coordinate power generation on the Columbia River system, protect uses of the river system (e.g., irrigation, recreation, navigation), and enhance fish and wildlife production. Staff members at BPA identified the need to compile and index information resources that would help answer environmental impact questions. A computer retrieval system that would provide ready access to the information was envisioned. This project was supported by BPA to provide an initial step toward a compilation of environmental impact information. Scientists at Pacific Northwest Laboratory (PNL) identified, gathered, and evaluated information related to environmental effects of water level on uses of five study reservoirs and developed and implemented and environmental data retrieval system, which provides for automated storage and retrieval of annotated citations to published and unpublished information. The data retrieval system is operating on BPA's computer facility and includes the reservoir water-level environmental data. This project was divided into several tasks, some of which were conducted simultaneously to meet project deadlines. The tasks were to identify uses of the five study reservoirs, compile and evaluate reservoir information, develop a data entry and retrieval system, identify and analyze research needs, and document the data retrieval system and train users. Additional details of the project are described in several appendixes.

  19. Project Integration Architecture: Inter-Application Propagation of Information

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    A principal goal of the Project Integration Architecture (PIA) is to facilitate the meaningful inter-application transfer of application-value-added information. Such exchanging applications may be largely unrelated to each other except through their applicability to an overall project; however, the PIA effort recognizes as fundamental the need to make such applications cooperate despite wide disparaties either in the fidelity of the analyses carried out, or even the disciplines of the analysis. This paper discusses the approach and techniques applied and anticipated by the PIA project in treating this need.

  20. Web-based Construction Information Management System

    Directory of Open Access Journals (Sweden)

    David Scott

    2012-11-01

    Full Text Available Centralised information systems that are accessible to all parties in a construction project are powerful tools in the quest to improve efficiency and to enhance the flow of information within the construction industry. This report points out the maturity of the necessary IT technology, the availability and the suitability of existing commercial products.Some of these products have been studied and analysed. An evaluation and selection process based on the functions offered in the products and their utility is presented. A survey of local construction personnel has been used to collect typical weighting data and performance criteria used in the evaluation process.

  1. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  2. Preliminary study on the three-dimensional geoscience information system of high-level radioactive waste geological disposal

    International Nuclear Information System (INIS)

    Li Peinan; Zhu Hehua; Li Xiaojun; Wang Ju; Zhong Xia

    2010-01-01

    The 3D geosciences information system of high-level radioactive waste geological disposal is an important research direction in the current high-level radioactive waste disposal project and a platform of information integration and publishing can be used for the relevant research direction based on the provided data and models interface. Firstly, this paper introduces the basic features about the disposal project of HLW and the function and requirement of the system, which includes the input module, the database management module, the function module, the maintenance module and the output module. Then, the framework system of the high-level waste disposal project information system has been studied, and the overall system architecture has been proposed. Finally, based on the summary and analysis of the database management, the 3D modeling, spatial analysis, digital numerical integration and visualization of underground project, the implementations of key functional modules and the platform have been expounded completely, and the conclusion has been drawn that the component-based software development method should be utilized in system development. (authors)

  3. Factors Affecting Successful Implementation of Hospital Information Systems.

    Science.gov (United States)

    Farzandipur, Mehrdad; Jeddi, Fatemeh Rangraz; Azimi, Esmaeil

    2016-02-01

    Today, the use of information systems in health environments, like any other fields, is necessary and organizational managers are convinced to use these systems. However, managers' satisfaction is not the only factor in successfully implementing these systems and failed information technology projects (IT) are reported despite the consent of the directors. Therefore, this study aims to determine the factors affecting the successful implementation of a hospital information system. The study was carried out as a descriptive method in 20 clinical hospitals that the hospital information system (HIS) was conducted in them. The clinical and paraclinical users of mentioned hospitals are the study group. 400 people were chosen as samples in scientific method and the data was collected using a questionnaire consisted of three main human, managerial and organizational, and technological factors, by questionnaire and interview. Then the data was scored in Likert scale (score of 1 to 5) and were analyzed using the SPSS software. About 75 percent of the population were female, with average work experience of 10 years and the mean age was 30 years. The human factors affecting the success of hospital information system implementation achieved the mean score of 3.5, both organizational and managerial factors 2.9 and technological factors the mean of 3. Human factors including computer skills, perceiving usefulness and perceiving the ease of a hospital information system use are more effective on the acceptance and successful implementation of hospital information systems; then the technological factors play a greater role. It is recommended that for the successful implementation of hospital information systems, most of these factors to be considered.

  4. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  5. Justifying an information system.

    Science.gov (United States)

    Neal, T

    1993-03-01

    A four-step model for the hospital pharmacist to use in justifying a computerized information system is described. In the first step, costs are identified and analyzed. Both the costs and the advantages of the existing system are evaluated. A request for information and a request for proposal are prepared and sent to vendors, who return estimates of hardware, software, and support costs. Costs can then be merged and analyzed as one-time costs, recurring annual costs, and total costs annualized over five years. In step 2, benefits are identified and analyzed. Tangible economic benefits are those that directly reduce or avoid costs or directly enhance revenues and can be measured in dollars. Intangible economic benefits are realized through a reduction in overhead and reallocation of labor and are less easily measured in dollars. Noneconomic benefits, some involving quality-of-care issues, can also be used in the justification. Step 3 consists of a formal risk assessment in which the project is broken into categories for which specific questions are answered by assigning a risk factor. In step 4, both costs and benefits are subjected to a financial analysis, the object of which is to maximize the return on investment to the institution from the capital being requested. Calculations include return on investment based on the net present value of money, internal rate of return, payback period, and profitability index. A well-designed justification for an information system not only identifies the costs, risks, and benefits but also presents a plan of action for realizing the benefits.

  6. Modernizing Corporate MIS: from Information System Modelling to Implementation

    CERN Document Server

    Dheur, E; Martens, R; Petrilli, A; Smale, B

    1992-01-01

    This paper presents CERN's Advanced Informatics Support (AIS) project which aims at an innovative modernization of all aspects of informatics applied to the administrative processes of the Laboratory. The project began in August 1990 and is based on a proprietary operating system, relational data base system and scalable multi-processor server hardware. An analysis of the existing applications environment and its weaknesses is given in the introduction. The objectives of the project are then described. A justification of the strategic choices is given in the CERN context. The Information System Study, leading to a global data and function model for the Laboratory and the detailed area analysis of the top priority three areas are then described. An analysis is made of the benefits and disadvantages of the use of Oracle CASE in such a study and the compromises required when commercial applications packages were chosen.

  7. National Parks of New York Harbor Traveler Information System : Functional Requirements

    Science.gov (United States)

    2011-12-23

    The purpose of this planning project is to analyze alternatives and design a Traveler Information System (TIS) that will enhance the experience of visitors to the NYNH parks and other sites managed by federal, state and local partners. The system wil...

  8. The water reactor safety research project index: a description of the computerized system for its databank

    International Nuclear Information System (INIS)

    Della Loggia, E.; Primavera, R.

    1993-01-01

    The water reactor nuclear safety research project index has been published by the CEC for many years as a compilation of information on research projects relating to LWR nuclear safety. Since 1981, it has been published, alternatively with NEA (OECD), every second year. The number of contributions from research organizations in Community member countries has steadily increased and reached the level of 1 700 pages, in which more than 600 project descriptions have been collected. In 1988, for the first time, the document was produced using a computerized system developed with the assistance of the ISEI (Institute for Systems Engineering and Informatics) of JRC Ispra. The data have been stored in a computer based in Ispra. The system allows searching a preselected set of subjects through the information stored in the computer: it makes the updating of the projects description much easier and makes the retrieval of the data possible. This report presents a short description of the computerized system developed for the databank of the index. The computerized system presented in this report is structured in a quite general way and for that reason can be adapted very easily to every field where a databank needs to be constituted in order to collect extended information on several projects. (authors). 6 figs., 5 tabs., 5 refs

  9. The ADAM project: a generic web interface for retrieval and display of ATLAS TDAQ information

    International Nuclear Information System (INIS)

    Harwood, A; Miotto, G Lehmann; Magnoni, L; Vandelli, W; Savu, D

    2012-01-01

    This paper describes a new approach to the visualization of information about the operation of the ATLAS Trigger and Data Acquisition system. ATLAS is one of the two general purpose detectors positioned along the Large Hadron Collider at CERN. Its data acquisition system consists of several thousand computers interconnected via multiple gigabit Ethernet networks, that are constantly monitored via different tools. Operational parameters ranging from the temperature of the computers to the network utilization are stored in several databases for later analysis. Although the ability to view these data-sets individually is already in place, currently there is no way to view this data together, in a uniform format, from one location. The ADAM project has been launched in order to overcome this limitation. It defines a uniform web interface to collect data from multiple providers that have different structures. It is capable of aggregating and correlating the data according to user defined criteria. Finally, it visualizes the collected data using a flexible and interactive front-end web system. Structurally, the project comprises of 3 main levels of the data collection cycle: The Level 0 represents the information sources within ATLAS. These providers do not store information in a uniform fashion. The first step of the project was to define a common interface with which to expose stored data. The interface designed for the project originates from the Google Data Protocol API. The idea is to allow read-only access to data providers, through HTTP requests similar in format to the SQL query structure. This provides a standardized way to access this different information sources within ATLAS. The Level 1 can be considered the engine of the system. The primary task of the Level 1 is to gather data from multiple data sources via the common interface, to correlate this data together, or over a defined time series, and expose the combined data as a whole to the Level 2 web

  10. The ADAM project: a generic web interface for retrieval and display of ATLAS TDAQ information

    Science.gov (United States)

    Harwood, A.; Lehmann Miotto, G.; Magnoni, L.; Vandelli, W.; Savu, D.

    2012-06-01

    This paper describes a new approach to the visualization of information about the operation of the ATLAS Trigger and Data Acquisition system. ATLAS is one of the two general purpose detectors positioned along the Large Hadron Collider at CERN. Its data acquisition system consists of several thousand computers interconnected via multiple gigabit Ethernet networks, that are constantly monitored via different tools. Operational parameters ranging from the temperature of the computers to the network utilization are stored in several databases for later analysis. Although the ability to view these data-sets individually is already in place, currently there is no way to view this data together, in a uniform format, from one location. The ADAM project has been launched in order to overcome this limitation. It defines a uniform web interface to collect data from multiple providers that have different structures. It is capable of aggregating and correlating the data according to user defined criteria. Finally, it visualizes the collected data using a flexible and interactive front-end web system. Structurally, the project comprises of 3 main levels of the data collection cycle: The Level 0 represents the information sources within ATLAS. These providers do not store information in a uniform fashion. The first step of the project was to define a common interface with which to expose stored data. The interface designed for the project originates from the Google Data Protocol API. The idea is to allow read-only access to data providers, through HTTP requests similar in format to the SQL query structure. This provides a standardized way to access this different information sources within ATLAS. The Level 1 can be considered the engine of the system. The primary task of the Level 1 is to gather data from multiple data sources via the common interface, to correlate this data together, or over a defined time series, and expose the combined data as a whole to the Level 2 web

  11. The enhanced mine communications and information systems. The development of the Nexsys realtime risk management system

    Energy Technology Data Exchange (ETDEWEB)

    Haustein, K.; Rowan, G. [CSIRO Exploration and Mining (Australia)

    2007-03-15

    The article describes two safety projects under way between JCOAL in Japan and CSIRO (Australia) which are concluding in March 2007. The first was to develop a real-time roof fall monitoring and warning system for underground coal mines. The system consisted of extensometers, stress meters and a seismic monitoring system. It was installed at the Ulan colliery in New South Wales. The output of the system is a set of probabilities of a roof fall happening within various periods of time. The three instruments have colour-coded warning lights. The second project, the enhanced mine communications and information systems for real-time risk analysis project, collects and analyses data from diverse sources with the Nexsys{trademark} hardware and software system. It is now installed in two mines in Australia and one in Japan. The system is described in detail in the article. 2 refs., 6 figs.

  12. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  13. A Framework for BIM-Enabled Life-Cycle Information Management of Construction Project

    Directory of Open Access Journals (Sweden)

    Xun Xu

    2014-08-01

    Full Text Available BIM has been widely used in project management, but on the whole the applications have been scattered and the BIM models have not been deployed throughout the whole project life-cycle. Each participant builds their own BIM, so there is a major problem in how to integrate these dynamic and fragmented data together. In order to solve this problem, this paper focuses on BIM-based life-cycle information management and builds a framework for BIM-enabled life-cycle information management. To organize the life-cycle information well, the information components and information flow during the project life-cycle are defined. Then, the application of BIM in life-cycle information management is analysed. This framework will provide a unified platform for information management and ensure data integrity.

  14. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  15. Models, Metaphors and Symbols for Information and Knowledge Systems

    Directory of Open Access Journals (Sweden)

    David Williams

    2014-01-01

    Full Text Available A literature search indicates that Data, Information and Knowledge continue to be placed into a hierarchical construct where it is considered that information is more valuable than data and that information can be processed into becoming precious knowledge. Wisdom continues to be added to the model to further confuse the issue. This model constrains our ability to think more logically about how and why we develop knowledge management systems to support and enhance knowledge- intensive processes, tasks or projects. This paper seeks to summarise development of the Data-Information-Knowledge-Wisdom hierarchy, explore the extensive criticism of it and present a more logical (and accurate construct for the elements of intellectual capital when developing and managing Knowledge Management Systems.

  16. Information, Vol. 1, Number 4. Teacher Corps Dissemination Project Bulletin.

    Science.gov (United States)

    Rosenau, Fred S., Ed.

    Guidelines are provided for disseminating information on teacher corps projects. Information is given on experienced disseminators such as existing networks that are available to help in planning. Suggestions are made on targeting information and marketing. (JD)

  17. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  18. An overview of the evaluation plan for PC/MISI: PC-based Multiple Information System Interface

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Lim, Bee Lee; Hall, Philip P.

    1985-01-01

    An initial evaluation plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intend to be used as a blueprint for the evaluation of this system. Each objective of the design project is discussed along with the evaluation parameters and methodology to be used in the evaluation of the implementation's achievement of those objectives. The potential of the system for research activities related to more general aspects of information retrieval is also discussed.

  19. INSPIRE: A new scientific information system for HEP

    International Nuclear Information System (INIS)

    Ivanov, R; Raae, L

    2010-01-01

    The status of high-energy physics (HEP) information systems has been jointly analyzed by the libraries of CERN, DESY, Fermilab and SLAC. As a result, the four laboratories have started the INSPIRE project - a new platform built by moving the successful SPIRES features and content, curated at DESY, Fermilab and SLAC, into the open-source CDS Invenio digital library software that was developed at CERN. INSPIRE will integrate current acquisition workflows and databases to host the entire body of the HEP literature (about one million records), aiming to become the reference HEP scientific information platform worldwide. It will provide users with fast access to full text journal articles and preprints, but also material such as conference slides and multimedia. INSPIRE will empower scientists with new tools to discover and access the results most relevant to their research, enable novel text- and data-mining applications, and deploy new metrics to assess the impact of articles and authors. In addition, it will introduce the 'Web 2.0' paradigm of user-enriched content in the domain of sciences, with community-based approaches to scientific publishing. INSPIRE represents a natural evolution of scholarly communication built on successful community-based information systems, and it provides a vision for information management in other fields of science. Inspired by the needs of HEP, we hope that the INSPIRE project will be inspiring for other communities.

  20. Data Systems vs. Information Systems

    OpenAIRE

    Amatayakul, Margret K.

    1982-01-01

    This paper examines the current status of “hospital information systems” with respect to the distinction between data systems and information systems. It is proposed that the systems currently existing are incomplete data dystems resulting in ineffective information systems.

  1. EUnetHTA information management system: development and lessons learned.

    Science.gov (United States)

    Chalon, Patrice X; Kraemer, Peter

    2014-11-01

    The aim of this study was to describe the techniques used in achieving consensus on common standards to be implemented in the EUnetHTA Information Management System (IMS); and to describe how interoperability between tools was explored. Three face to face meetings were organized to identify and agree on common standards to the development of online tools. Two tools were created to demonstrate the added value of implementing interoperability standards at local levels. Developers of tools outside EUnetHTA were identified and contacted. Four common standards have been agreed on by consensus; and consequently all EUnetHTA tools have been modified or designed accordingly. RDF Site Summary (RSS) has demonstrated a good potential to support rapid dissemination of HTA information. Contacts outside EUnetHTA resulted in direct collaboration (HTA glossary, HTAi Vortal), evaluation of options for interoperability between tools (CRD HTA database) or a formal framework to prepare cooperation on concrete projects (INAHTA projects database). While being entitled a project on IT infrastructure, the work program was also about people. When having to agree on complex topics, fostering a cohesive group dynamic and hosting face to face meetings brings added value and enhances understanding between partners. The adoption of widespread standards enhanced the homogeneity of the EUnetHTA tools and should thus contribute to their wider use, therefore, to the general objective of EUnetHTA. The initiatives on interoperability of systems need to be developed further to support a general interoperable information system that could benefit the whole HTA community.

  2. Development of 3D VR plant digital information system

    International Nuclear Information System (INIS)

    Suh, Kune Y.; Ryu, Joong W.; Kang, Myung G.; Kim, H. Y.; Cho, J. G.; Kim, D. H.; Park, J. W.

    2006-07-01

    Currently, there are many ongoing efforts to shorten the plant refueling and maintenance outage durations, and it is expected to become more active as the time goes on. Improved training and education system are required for the personnel to perform efficient inspection on time. This work is focused on establishing virtual Nuclear Power Plant system which will help train the personnel to understand the system characteristics of the plant by creating navigation enabled 3D plant mockups. Furthermore, this project is aimed at constructing information management system over the whole plant area, by integrating safety related data and combining it with web based GUI technology, to make search and management activities easy. This project spans three years. The forst year was spent in 3D mockup modeling of most part of the plant, and prototyping the web based VR plant digital information system. Plant environment, buildings, reactor structure, steam generator, pressurizer, fuel assemblies, pressurizer safety valve, main steamline safety valve, reactor coolant system, main steamline system, auxiliary and main coolant supply system were modeled into 3D mockups. Control functions such as magnification, rotation, movement, transparency, location detection, cross-cut view, full screen toggle and screen capture were implemented to facilitate manipulation of and navigation through the VR mockups. It is expected that the VR plant will serve as an effective support system for power plant regulation and inspection

  3. The EHR-ARCHE project: Satisfying clinical information needs in a Shared Electronic Health Record System based on IHE XDS and Archetypes☆

    Science.gov (United States)

    Duftschmid, Georg; Rinner, Christoph; Kohler, Michael; Huebner-Bloder, Gudrun; Saboor, Samrend; Ammenwerth, Elske

    2013-01-01

    Purpose While contributing to an improved continuity of care, Shared Electronic Health Record (EHR) systems may also lead to information overload of healthcare providers. Document-oriented architectures, such as the commonly employed IHE XDS profile, which only support information retrieval at the level of documents, are particularly susceptible for this problem. The objective of the EHR-ARCHE project was to develop a methodology and a prototype to efficiently satisfy healthcare providers’ information needs when accessing a patient's Shared EHR during a treatment situation. We especially aimed to investigate whether this objective can be reached by integrating EHR Archetypes into an IHE XDS environment. Methods Using methodical triangulation, we first analysed the information needs of healthcare providers, focusing on the treatment of diabetes patients as an exemplary application domain. We then designed ISO/EN 13606 Archetypes covering the identified information needs. To support a content-based search for fine-grained information items within EHR documents, we extended the IHE XDS environment with two additional actors. Finally, we conducted a formative and summative evaluation of our approach within a controlled study. Results We identified 446 frequently needed diabetes-specific information items, representing typical information needs of healthcare providers. We then created 128 Archetypes and 120 EHR documents for two fictive patients. All seven diabetes experts, who evaluated our approach, preferred the content-based search to a conventional XDS search. Success rates of finding relevant information was higher for the content-based search (100% versus 80%) and the latter was also more time-efficient (8–14 min versus 20 min or more). Conclusions Our results show that for an efficient satisfaction of health care providers’ information needs, a content-based search that rests upon the integration of Archetypes into an IHE XDS-based Shared EHR system is

  4. The EHR-ARCHE project: satisfying clinical information needs in a Shared Electronic Health Record system based on IHE XDS and Archetypes.

    Science.gov (United States)

    Duftschmid, Georg; Rinner, Christoph; Kohler, Michael; Huebner-Bloder, Gudrun; Saboor, Samrend; Ammenwerth, Elske

    2013-12-01

    While contributing to an improved continuity of care, Shared Electronic Health Record (EHR) systems may also lead to information overload of healthcare providers. Document-oriented architectures, such as the commonly employed IHE XDS profile, which only support information retrieval at the level of documents, are particularly susceptible for this problem. The objective of the EHR-ARCHE project was to develop a methodology and a prototype to efficiently satisfy healthcare providers' information needs when accessing a patient's Shared EHR during a treatment situation. We especially aimed to investigate whether this objective can be reached by integrating EHR Archetypes into an IHE XDS environment. Using methodical triangulation, we first analysed the information needs of healthcare providers, focusing on the treatment of diabetes patients as an exemplary application domain. We then designed ISO/EN 13606 Archetypes covering the identified information needs. To support a content-based search for fine-grained information items within EHR documents, we extended the IHE XDS environment with two additional actors. Finally, we conducted a formative and summative evaluation of our approach within a controlled study. We identified 446 frequently needed diabetes-specific information items, representing typical information needs of healthcare providers. We then created 128 Archetypes and 120 EHR documents for two fictive patients. All seven diabetes experts, who evaluated our approach, preferred the content-based search to a conventional XDS search. Success rates of finding relevant information was higher for the content-based search (100% versus 80%) and the latter was also more time-efficient (8-14min versus 20min or more). Our results show that for an efficient satisfaction of health care providers' information needs, a content-based search that rests upon the integration of Archetypes into an IHE XDS-based Shared EHR system is superior to a conventional metadata-based XDS

  5. Development of Nuclear Control and Management Information Treatment System

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, J. G.; Lee, B. D.; So, D. S. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2007-07-01

    To implement obligations under the Non-Proliferation Treaty (NPT) and the bilateral agreements more effectively, we proposed a computerized system named the Nuclear Control and Management Information Treatment System (NCAMITS) as a part of the Nuclear Transparency Enhancement Project at the Korea Atomic Energy Research Institute (KAERI). The database system is designed not only to undertake the facility-level accounting for and control of nuclear material at KAERI, but also to meet the requirements of the State (National) System of Accounting and Control (SSAC). Since the NCAMITS will provide services for the facility operators as well as the safeguard information managers at KAERI, the development of the system is supposed to accommodate the end-user's convenience and the manager's sophisticated specifications as well.

  6. Language analysis for dialogue management in a theatre information and booking system

    NARCIS (Netherlands)

    Andernach, T.; Andernach, J.A.; ter Doest, H.W.L.; op den Akker, Hendrikus J.A.; van der Hoeven, Gerrit; Schaake, Jan; Schaake, J.; van der Burgt, S.; Nijholt, Antinus

    SCHISMA is a joint research project of KPN (Royal PTT Nederland) and the University of Twente. The project aims at providing a natural language dialogue system which interfaces a database containing information about theatre performances in a certain city or region. The interface should make it

  7. Laboratory information management system: an example of international cooperation in Namibia.

    Science.gov (United States)

    Colangeli, Patrizia; Ferrilli, Monica; Quaranta, Fabrizio; Malizia, Elio; Mbulu, Rosa-Stella; Mukete, Esther; Iipumbu, Lukas; Kamhulu, Anna; Tjipura-Zaire, Georgina; Di Francesco, Cesare; Lelli, Rossella; Scacchia, Massimo

    2012-01-01

    The authors describe the project undertaken by the Istituto G. Caporale to provide a laboratory information management system (LIMS) to the Central Veterinary Laboratory (CVL) in Windhoek, Namibia. This robust laboratory management tool satisfies Namibia's information obligations under international quality standard ISO 17025:2005. The Laboratory Information Management System (LIMS) for Africa was designed to collect and manage all necessary information on samples, tests and test results. The system involves the entry of sample data on arrival, as required by Namibian sampling plans, the tracking of samples through the various sections of the CVL, the collection of test results, generation of test reports and monitoring of outbreaks through data interrogation functions, eliminating multiple registrations of the same data on paper records. It is a fundamental component of the Namibian veterinary information system.

  8. Materials Information for Science and Technology (MIST): Project overview: Phase 1 and 2 and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-11-01

    The National Bureau of Standards and the Department of Energy have embarked on a program to build a demonstration computerized materials data system called Materials Information for Science and Technology (MIST). This report documents the first two phases of the project. The emphasis of the first phase was on determining what information was needed and how it could impact user productivity. The second phase data from the Aerospace Metal Handbook on a set of alloys was digitized and incorporated in the system.

  9. A laboratory information management system for DNA barcoding workflows

    NARCIS (Netherlands)

    Vu, D.; Eberhardt, U.; Szöke, S.; Groenewald, M.; Robert, V.

    2012-01-01

    This paper presents a laboratory information management system for DNA sequences (LIMS) created and based on the needs of a DNA barcoding project at the CBS-KNAW Fungal Biodiversity Centre (Utrecht, the Netherlands). DNA barcoding is a global initiative for species identification through simple DNA

  10. Decontamination systems information and research program. Quarterly report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The projects reported for the WVU Cooperative Agreement are categorized into the following three areas: (1) in situ remediation process development; (2) advanced product applications testing; and (3) information systems, public policy, community outreach, and economics. Summaries of the significant accomplishments for the projects reported during the period 1 July 1995 through 30 September 1995 are presented.

  11. Information technology project risk management in Peru

    OpenAIRE

    Del Carpio Gallegos, Javier

    2014-01-01

    This article shows how some principles, uses, and practices of risk management are applied in information technology projects in Peru; in the last four years, in representative sectors like manufacturing, banking, information and communications, academics institutions, construction, government, consulting, services, and others. El presente artículo muestra algunos principios, usos y prácticas de cómo la gestión de riesgos de proyectos de tecnología se ha llevado a cabo en los últimos cuatr...

  12. Formalization of software requirements for information systems using fuzzy logic

    Science.gov (United States)

    Yegorov, Y. S.; Milov, V. R.; Kvasov, A. S.; Sorokoumova, S. N.; Suvorova, O. V.

    2018-05-01

    The paper considers an approach to the design of information systems based on flexible software development methodologies. The possibility of improving the management of the life cycle of information systems by assessing the functional relationship between requirements and business objectives is described. An approach is proposed to establish the relationship between the degree of achievement of business objectives and the fulfillment of requirements for the projected information system. It describes solutions that allow one to formalize the process of formation of functional and non-functional requirements with the help of fuzzy logic apparatus. The form of the objective function is formed on the basis of expert knowledge and is specified via learning from very small data set.

  13. An ontologically founded architecture for information systems in clinical and epidemiological research.

    Science.gov (United States)

    Uciteli, Alexandr; Groß, Silvia; Kireyev, Sergej; Herre, Heinrich

    2011-08-09

    This paper presents an ontologically founded basic architecture for information systems, which are intended to capture, represent, and maintain metadata for various domains of clinical and epidemiological research. Clinical trials exhibit an important basis for clinical research, and the accurate specification of metadata and their documentation and application in clinical and epidemiological study projects represents a significant expense in the project preparation and has a relevant impact on the value and quality of these studies.An ontological foundation of an information system provides a semantic framework for the precise specification of those entities which are presented in this system. This semantic framework should be grounded, according to our approach, on a suitable top-level ontology. Such an ontological foundation leads to a deeper understanding of the entities of the domain under consideration, and provides a common unifying semantic basis, which supports the integration of data and the interoperability between different information systems.The intended information systems will be applied to the field of clinical and epidemiological research and will provide, depending on the application context, a variety of functionalities. In the present paper, we focus on a basic architecture which might be common to all such information systems. The research, set forth in this paper, is included in a broader framework of clinical research and continues the work of the IMISE on these topics.

  14. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  15. NASA Intelligent Systems Project: Results, Accomplishments and Impact on Science Missions

    Science.gov (United States)

    Coughlan, Joseph C.

    2005-01-01

    The Intelligent Systems Project was responsible for much of NASA's programmatic investment in artificial intelligence and advanced information technologies. IS has completed three major project milestones which demonstrated increased capabilities in autonomy, human centered computing, and intelligent data understanding. Autonomy involves the ability of a robot to place an instrument on a remote surface with a single command cycle. Human centered computing supported a collaborative, mission centric data and planning system for the Mars Exploration Rovers and data understanding has produced key components of a terrestrial satellite observation system with automated modeling and data analysis capabilities. This paper summarizes the technology demonstrations and metrics which quantify and summarize these new technologies which are now available for future Nasa missions.

  16. Collaborative ethnography for information systems research Studying knowledge work practices and designing supportive information systems

    Directory of Open Access Journals (Sweden)

    Ronald Maier

    2012-04-01

    Full Text Available Understanding knowledge work and supporting it with information systems (ISs are challenging tasks. Knowledge work has changed substantially recently and studies on how knowledge work is currently performed are scarce. Ethnography is the most suitable qualitative research method for studying knowledge work, yet too time-consuming, costly and unfocused for the fast changing IS domain. Moreover, results from qualitative studies need to be transformed into artefacts useful for IS requirements engineering and design. This paper proposes a procedure for collaborative ethnography to study knowledge work practices and inform IS requirements gathering and design illustrated with the case of a collaborative ethnographic study of seven organisations in four European countries performed in a large-scale international IS research and development project. The paper also critically discusses the procedure’s applicability and limitations.

  17. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing

    Science.gov (United States)

    2011-12-31

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  18. Designing information systems

    CERN Document Server

    Blethyn, Stanley G

    2014-01-01

    Designing Information Systems focuses on the processes, methodologies, and approaches involved in designing information systems. The book first describes systems, management and control, and how to design information systems. Discussions focus on documents produced from the functional construction function, users, operators, analysts, programmers and others, process management and control, levels of management, open systems, design of management information systems, and business system description, partitioning, and leveling. The text then takes a look at functional specification and functiona

  19. Method Engineering: Engineering of Information Systems Development Methods and Tools

    OpenAIRE

    Brinkkemper, J.N.; Brinkkemper, Sjaak

    1996-01-01

    This paper proposes the term method engineering for the research field of the construction of information systems development methods and tools. Some research issues in method engineering are identified. One major research topic in method engineering is discussed in depth: situational methods, i.e. the configuration of a project approach that is tuned to the project at hand. A language and support tool for the engineering of situational methods are discussed.

  20. Hospital information system: reusability, designing, modelling, recommendations for implementing.

    Science.gov (United States)

    Huet, B

    1998-01-01

    The aims of this paper are to precise some essential conditions for building reuse models for hospital information systems (HIS) and to present an application for hospital clinical laboratories. Reusability is a general trend in software, however reuse can involve a more or less part of design, classes, programs; consequently, a project involving reusability must be precisely defined. In the introduction it is seen trends in software, the stakes of reuse models for HIS and the special use case constituted with a HIS. The main three parts of this paper are: 1) Designing a reuse model (which objects are common to several information systems?) 2) A reuse model for hospital clinical laboratories (a genspec object model is presented for all laboratories: biochemistry, bacteriology, parasitology, pharmacology, ...) 3) Recommendations for generating plug-compatible software components (a reuse model can be implemented as a framework, concrete factors that increase reusability are presented). In conclusion reusability is a subtle exercise of which project must be previously and carefully defined.

  1. Internet-based information system of digital geological data providing

    Science.gov (United States)

    Yuon, Egor; Soukhanov, Mikhail; Markov, Kirill

    2015-04-01

    One of the Russian Federal аgency of mineral resources problems is to provide the geological information which was delivered during the field operation for the means of federal budget. This information should be present in the current, conditional form. Before, the leading way of presenting geological information were paper geological maps, slices, borehole diagrams reports etc. Technologies of database construction, including distributed databases, technologies of construction of distributed information-analytical systems and Internet-technologies are intensively developing nowadays. Most of geological organizations create their own information systems without any possibility of integration into other systems of the same orientation. In 2012, specialists of VNIIgeosystem together with specialists of VSEGEI started the large project - creating the system of providing digital geological materials with using modern and perspective internet-technologies. The system is based on the web-server and the set of special programs, which allows users to efficiently get rasterized and vectorised geological materials. These materials are: geological maps of scale 1:1M, geological maps of scale 1:200 000 and 1:2 500 000, the fragments of seamless geological 1:1M maps, structural zoning maps inside the seamless fragments, the legends for State geological maps 1:200 000 and 1:1 000 000, full author's set of maps and also current materials for international projects «Atlas of geological maps for Circumpolar Arctic scale 1:5 000 000» and «Atlas of Geologic maps of central Asia and adjacent areas scale 1:2 500 000». The most interesting and functional block of the system - is the block of providing structured and well-formalized geological vector materials, based on Gosgeolkart database (NGKIS), managed by Oracle and the Internet-access is supported by web-subsystem NGKIS, which is currently based on MGS-Framework platform, developed by VNIIgeosystem. One of the leading elements

  2. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  3. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  4. Developing common information elements for renewable energy systems: summary and proceedings of the SERI/AID workshop

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, J.H.; Neuendorffer, J.W.

    1980-06-01

    This report describes the activities, conclusions, and recommendations of the Workshop on Evaluation Systems for Renewable Energy Systems sponsored by the Agency for International Development and SERI, held 20-22 February 1980 in Golden, Colorado. The primary objectives of the workshop was to explore whether it was possible to establish common information elements that would describe the operation and impact of renewable energy projects in developing countries. The workshop provided a forum for development program managers to discuss the information they would like to receive about renewable energy projects and to determine whether common data could be agreed on to facilitate information exchange among development organizations. Such information could be shared among institutions and used to make informed judyments on the economic, technical, and social feasibility of the technologies. Because developing countries and foreign assistance agencies will be financing an increasing number of renewable energy projects, these organizations need information on the field experience of renewable energy technologies. The report describes the substance of the workshop discussions and includes the papers presented on information systems and technology evaluation and provides lists of important information elements generated by both the plenary sessions and the small working groups.

  5. Laboratory information management system: an example of international cooperation in Namibia

    Directory of Open Access Journals (Sweden)

    Patrizia Colangeli

    2012-09-01

    Full Text Available The authors describe the project undertaken by the Istituto G. Caporale to provide a laboratory information management system (LIMS to the Central Veterinary Laboratory (CVL in Windhoek, Namibia. This robust laboratory management tool satisfies Namibia’s information obligations under international quality standard ISO 17025:2005. The Laboratory Information Management System (LIMS for Africa was designed to collect and manage all necessary information on samples, tests and test results. The system involves the entry of sample data on arrival, as required by Namibian sampling plans, the tracking of samples through the various sections of the CVL, the collection of test results, generation of test reports and monitoring of outbreaks through data interrogation functions, eliminating multiple registrations of the same data on paper records. It is a fundamental component of the Namibian veterinary information system.

  6. Integrated Information System for Higher Education Qualifications

    Directory of Open Access Journals (Sweden)

    Catalin Ionut SILVESTRU

    2012-10-01

    Full Text Available In the present article we aim to study thoroughly and detail aspects related to architectures specific for e-learning and management of human resources training interconnected to management of qualifications. In addition, we take into consideration combining e-learning architectures with software in an e-learning system interconnected with the National Registry of Qualifications of Higher Education, in view of developing and information system that correlates educational supply from higher education from Romania with labor market demands through qualifications. The scientific endeavor consists of original architectural solutions to integrate data, systems, processes, services from various sources and to use them in the proposed system. The practical result of the scientific endeavor is represented by design of architectures required for developing an e-learning system interconnected with the National Registry of Qualifications from Romania, which involve in first stage the qualifications provided by higher education. The proposed innovative solution consists in the fact that the proposed information system combines the advantages of content management system (CMS with learning content management system (LCMS and with reusable learning objects (RLO. Thus, the architecture proposed in the research ensures the integration of a content management system with a portal for information, guidance and support in making a professional project. The integration enables correlation of competences with content areas and specific items from various teaching subjects, thus evaluating the usefulness for this registry from learning/educational perspective. Using the proposed information system in enables correlation among qualifications, content of educational program and continuous self-evaluation opportunities, which facilitate monitoring of progress and adjustment of learning content.

  7. Research cooperation project on manufacturing technology supported by advanced and integrated information system through international cooperation (MATIC); Kan`i sosagata denshi sekkei seisan shien system no kaihatsu ni kansuru kenkyu kyoryoku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    To support the advancement of basic industries including machine industry in Asian countries, research cooperation has been conducted for developing the manufacturing technology supported by advanced and integrated information system suitable for actual circumstances of individual countries. For the automotive and the parts industries, it is significant for the preparation works of manufacturing in overseas factories to possess common information between Japan and overseas factories. In this project, a system is constructed, which can be used in industries surrounding automotive industry, such as parts and facility industries, as well as in the automotive industry. In FY 1996, a primary system has been developed, and the demonstration tests were carried out. For the home electric machine and the parts industries, the technology applicable to the design of printed board circuit was developed, and the catalog of electronic parts was constructed. In FY 1996, a preliminary prototype system of the electronic parts catalog system was designed and developed. For the textile and apparel industries, the EDI, exchange system of CAD/CAM data, and construction of data bank were investigated. 87 figs., 19 tabs.

  8. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  9. A user-led approach to information systems investments

    International Nuclear Information System (INIS)

    Pferd, J.W.; Fuller, A.G.

    1993-01-01

    Information-system (IS) expenditures for upstream E ampersand P have come under strong review along with other overhead expenses. Increasing frustration with IS budgets and concern about their business value led Unocal Corp. to change the way it begins, manages, and implements IS projects. Successful IS investments are aligned with the goals and functions of work groups or business units and are balanced against other investments. The twin demands of business needs and sound technical design must be served together to achieve long-term success from IS investments. This paper describes project organizations and methods to achieve these two objectives

  10. System and technique for retrieving depth information about a surface by projecting a composite image of modulated light patterns

    Science.gov (United States)

    Hassebrook, Laurence G. (Inventor); Lau, Daniel L. (Inventor); Guan, Chun (Inventor)

    2010-01-01

    A technique, associated system and program code, for retrieving depth information about at least one surface of an object, such as an anatomical feature. Core features include: projecting a composite image comprising a plurality of modulated structured light patterns, at the anatomical feature; capturing an image reflected from the surface; and recovering pattern information from the reflected image, for each of the modulated structured light patterns. Pattern information is preferably recovered for each modulated structured light pattern used to create the composite, by performing a demodulation of the reflected image. Reconstruction of the surface can be accomplished by using depth information from the recovered patterns to produce a depth map/mapping thereof. Each signal waveform used for the modulation of a respective structured light pattern, is distinct from each of the other signal waveforms used for the modulation of other structured light patterns of a composite image; these signal waveforms may be selected from suitable types in any combination of distinct signal waveforms, provided the waveforms used are uncorrelated with respect to each other. The depth map/mapping to be utilized in a host of applications, for example: displaying a 3-D view of the object; virtual reality user-interaction interface with a computerized device; face--or other animal feature or inanimate object--recognition and comparison techniques for security or identification purposes; and 3-D video teleconferencing/telecollaboration.

  11. Democratizing Human Genome Project Information: A Model Program for Education, Information and Debate in Public Libraries.

    Science.gov (United States)

    Pollack, Miriam

    The "Mapping the Human Genome" project demonstrated that librarians can help whomever they serve in accessing information resources in the areas of biological and health information, whether it is the scientists who are developing the information or a member of the public who is using the information. Public libraries can guide library…

  12. A knowledge based system for linking information to support decision making in construction

    NARCIS (Netherlands)

    Al-Jibouri, Saad H.S.; Mawdesley, Michael J.

    2002-01-01

    This work describes the development of a project model centred on the information and knowledge generated and used by managers. It describes a knowledge-based system designed for this purpose. A knowledge acquisition exercise was undertaken to determine the tasks of project managers and the

  13. Management system information of characterization of the dismantling project of Jose Cabrera; Sistema de Gestion de la informacion de caracterizacion del proyecto de desmantelamiento de la CN Jose Cabrera

    Energy Technology Data Exchange (ETDEWEB)

    Gimeno Blesa, M. E.; Martin Palomo, N.; Gomez Rodriguez, C. A.

    2011-07-01

    In the proposed dismantling and decommissioning of the Jose Cabrera NPP is designed and implemented a database of physical and radiological inventory, which provides a powerful tool to optimize the storage, monitoring and control of the characterization data. The database is a useful and reliable management system characterization information that facilitates access and information processing, and ensures their integrity and traceability along of the dismantling project.

  14. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  15. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  16. Micro Information Systems

    DEFF Research Database (Denmark)

    Ulslev Pedersen, Rasmus; Kühn Pedersen, Mogens

    2014-01-01

    such as medical and manufacturing. These new sensor applications have implications for information systems (IS) and, the authors visualize this new class of information systems as fractals growing from an established class of systems; namely that of information systems (IS). The identified applications...... and implications are used as an empirical basis for creating a model for these small new information systems. Such sensor systems are called embedded systems in the technical sciences, and the authors want to couple it with general IS. They call the merger of these two important research areas (IS and embedded...... systems) for micro information systems (micro-IS). It is intended as a new research field within IS research. An initial framework model is established, which seeks to capture both the possibilities and constraints of this new paradigm, while looking simultaneously at the fundamental IS and ICT aspects...

  17. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  18. Hanford Environmental Information System (HEIS) user's manual

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. Data stored in the HEIS are collected under several regulatory programs. Currently these include the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA); the Resource Conservation and Recovery Act of 1976 (RCRA); and the Ground-Water Environmental Surveillance Project, managed by the Pacific Northwest Laboratory. The HEIS is an information system with an inclusive database. The manual, the HEIS User's Manual, describes the facilities available to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines

  19. ISAIA: Interoperable Systems for Archival Information Access

    Science.gov (United States)

    Hanisch, Robert J.

    2002-01-01

    The ISAIA project was originally proposed in 1999 as a successor to the informal AstroBrowse project. AstroBrowse, which provided a data location service for astronomical archives and catalogs, was a first step toward data system integration and interoperability. The goals of ISAIA were ambitious: '...To develop an interdisciplinary data location and integration service for space science. Building upon existing data services and communications protocols, this service will allow users to transparently query hundreds or thousands of WWW-based resources (catalogs, data, computational resources, bibliographic references, etc.) from a single interface. The service will collect responses from various resources and integrate them in a seamless fashion for display and manipulation by the user.' Funding was approved only for a one-year pilot study, a decision that in retrospect was wise given the rapid changes in information technology in the past few years and the emergence of the Virtual Observatory initiatives in the US and worldwide. Indeed, the ISAIA pilot study was influential in shaping the science goals, system design, metadata standards, and technology choices for the virtual observatory. The ISAIA pilot project also helped to cement working relationships among the NASA data centers, US ground-based observatories, and international data centers. The ISAIA project was formed as a collaborative effort between thirteen institutions that provided data to astronomers, space physicists, and planetary scientists. Among the fruits we ultimately hoped would come from this project would be a central site on the Web that any space scientist could use to efficiently locate existing data relevant to a particular scientific question. Furthermore, we hoped that the needed technology would be general enough to allow smaller, more-focused community within space science could use the same technologies and standards to provide more specialized services. A major challenge to searching

  20. A stream-based mathematical model for distributed information processing systems - SysLab system model

    OpenAIRE

    Klein, Cornel; Rumpe, Bernhard; Broy, Manfred

    2014-01-01

    In the SysLab project we develop a software engineering method based on a mathematical foundation. The SysLab system model serves as an abstract mathematical model for information systems and their components. It is used to formalize the semantics of all used description techniques such as object diagrams state automata sequence charts or data-flow diagrams. Based on the requirements for such a reference model, we define the system model including its different views and their relationships.

  1. Decontamination systems information and research program. Quarterly report, October 1995--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    West Virginia University (WVU) and the U.S. Department of Energy Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement on August 29, 1992 titled {open_quotes}Decontamination Systems Information and Research programs{close_quotes} (DOE Instrument No. DE-FC21-92MC29467) This report contains the efforts of the research projects comprising the Agreement for the 4th calendar quarter of 1995, and is the final quarterly report deliverable required for the period ending 31 December 1995. The projects reported for the WVU Cooperative Agreement are categorized into the following three areas: 1.0 In Situ Remediation Process Development, 2.0 Advanced Product Applications Testing, and 3.0 Information Systems, Public Policy, Community Outreach, and Economics. Summaries of the significant accomplishments for the projects reported during the period 1 October 95 through 31 December 95 are presented in the following discussions.

  2. AIAA/NASA International Symposium on Space Information Systems, 2nd, Pasadena, CA, Sept. 17-19, 1990, Proceedings. Vols. 1 & 2

    Science.gov (United States)

    Tavenner, Leslie A. (Editor)

    1991-01-01

    These proceedings overview major space information system projects and lessons learned from current missions. Other topics include the science information system requirements for the 1990s, an information systems design approach for major programs, the technology needs and projections, the standards for space data information systems, the artificial intelligence technology and applications, international interoperability, and spacecraft data systems and architectures advanced communications. Other topics include the software engineering technology and applications, the multimission multidiscipline information system architectures, the distributed planning and scheduling systems and operations, and the computer and information systems architectures. Paper presented include prospects for scientific data analysis systems for solar-terrestrial physics in the 1990s, the Columbus data management system, data storage technologies for the future, the German aerospace research establishment, and launching artificial intelligence in NASA ground systems.

  3. The hypertext information system on pulsed neutron sources and scientific investigations based on these sources

    International Nuclear Information System (INIS)

    Litvinenko, E.I; Astakhov, Yu.A.; Akishina, E.P.; Semenov, R.N.; Smol'kov, I.S.

    1998-01-01

    The work on the creation of the hypertext information system has been performed on the basis of the web-server of the Frank Laboratory of Neutron Physics, JINR. The initial project proposed the creation of HTML information resources and did not consider the usage of any database for the information management. During the project implementation it became obvious that the system should have well defined structured informational model and it might be helpful to imply the relational database as a part of the system. The ORACLE server at the Laboratory of Computing Techniques and Automation (LCTA) of the JINR has been used for this task. Now we have a set of ORACLE tables designed using CASE tools for the informational model of the system, structured information about neutron sources, neutron instruments, printed publications and URL addresses. We have also the web interface to these tables using free ware gateway ORALINK installed on our Pentium PC with Windows NT and some tools to administer database and view pictures stored in the tables. We took into account NeXuS specifications while tried to design the informational model of the system, and we continue to work on its creation

  4. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  5. Patient-centred hand hygiene information in orthopaedics units: an evidence-based implementation project.

    Science.gov (United States)

    Ong, Arielle Yi Jia; Tan, Joanne; Yeo, Hui Ling; Goh, Mien Li

    2017-03-01

    This project aimed to improve patients' knowledge on the importance of hand hygiene. It involved providing patients with a patient and family education on the importance of hand hygiene using a patient information leaflet that introduces the rationale of hand hygiene, possible consequences of poor hand hygiene, and the seven steps of hand hygiene. This projected used a preimplementation and postimplementation audit strategy using the Joanna Briggs Institute Practical Application of Clinical Evidence System and Getting Research Into Practice programs. The implementation occurred in three phases over a period of 6 months from January 2014 to June 2014. The audits took place in two orthopaedic wards in a large acute care setting tertiary hospital in Singapore and involved a sample size of 54 patients. It involved going through the medical records of the cases, assessment of patient knowledge based on the audit criteria, and checking if the patients received the patient information leaflet on hand hygiene. The postimplementation audit found significant improvements in all three audit criteria. The percentage of patients who demonstrated knowledge in the importance of hand hygiene saw an improvement of 48.1%. There was an improvement of 44.5% in nurses' compliance to the documentation of patient education being carried out. The percentage of patients who received a patient information leaflet on hand hygiene saw an increase of 36.1%. This project demonstrated that a preimplementation and postimplementation audit is a viable method to implement change and translate evidence into practice. Through this project, patients gained an understanding on the importance of hand hygiene and could take better ownership of their well being. This may potentially improve hospitalization experience and benefit health outcomes. The positive results of this project are contributed by the enthusiastic involvement of all the stakeholders, from patients and their caregivers to the bedside

  6. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  7. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  8. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  9. Factors that influence the outcome of information technology projects in South Africa: An empirical investigation

    Directory of Open Access Journals (Sweden)

    Carl Marnewick

    2009-12-01

    Full Text Available Purpose: In developing countries such as South Africa, many organisations are reliant on information and communication technology (ICT to provide accurate, relevant and timely information. For organisations to obtain and sustain a competitive advantage, ICT systems are constantly implemented, upgraded, modified or replaced. These initiatives are often managed as projects. While there is an increasing amount of both financial resources and effort being spent on ICT, these projects are not always delivered within the predetermined project constraints. This implies additional time to complete, as well as additional costs, as resources are not released in time to participate in other projects. It is therefore important to understand the factors that influence the outcome of South African ICT projects relative to their original constraints. Problem Investigated: The goal of this article is to determine the factors that influence South African ICT projects, taking into consideration the fact that most current published research on this topic was done within the context of a developed country such as the USA and Europe. Design and/or methodology: The outcomes of ICT projects in South Africa as well as the factors that influence them were determined through an extensive survey. An analysis was done on the factors together with a correlation between the main factors contributing to project outcomes. The purpose of this was to establish if a factor's presence or absence influenced the eventual outcome. Findings: The factors that contribute to a successful outcome are often outside the direct control of the project manager and tend to be complex in nature. One factor that does stand out is that the alignment of projects with business objectives influences their perceived success. Originality/Value: The benefits of this article are that it firstly provides a South African perspective of current ICT project management practices, and secondly, it highlights

  10. NEDO information dissemination subcommittee. 18th project report meeting; NEDO joho fukyu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Explained in detail in a report on NEDO (New Energy and Industrial Technology Development Organization) information center activities is the exchange of information, which is accomplished through IEA (International Energy Agency) Energy Technology Data Exchange (ETDE) implementing agreement; IEA Coal Research implementing agreement; Center for the Analysis and Dissemination of Demonstrated Energy Technologies (CADDET); and IEA Greenhouse Gas Technology Information Exchange (GREENTIE). Described in relation with information dissemination activities are the opening to the public of NEDO achievement reports, NEDO Energy Database System (NEDO-EDBS), management of the library and data room, information available at Internet web sites, and so forth. Other project reports presented at the meeting include a survey of new energy actualities, publication of dedicated information journals, and so forth. At the second session of the project report meeting, a lecture is delivered, entitled Network Age and Information Distribution Revolution. (NEDO)

  11. ASEAN Mineral Database and Information System (AMDIS)

    Science.gov (United States)

    Okubo, Y.; Ohno, T.; Bandibas, J. C.; Wakita, K.; Oki, Y.; Takahashi, Y.

    2014-12-01

    AMDIS has lunched officially since the Fourth ASEAN Ministerial Meeting on Minerals on 28 November 2013. In cooperation with Geological Survey of Japan, the web-based GIS was developed using Free and Open Source Software (FOSS) and the Open Geospatial Consortium (OGC) standards. The system is composed of the local databases and the centralized GIS. The local databases created and updated using the centralized GIS are accessible from the portal site. The system introduces distinct advantages over traditional GIS. Those are a global reach, a large number of users, better cross-platform capability, charge free for users, charge free for provider, easy to use, and unified updates. Raising transparency of mineral information to mining companies and to the public, AMDIS shows that mineral resources are abundant throughout the ASEAN region; however, there are many datum vacancies. We understand that such problems occur because of insufficient governance of mineral resources. Mineral governance we refer to is a concept that enforces and maximizes the capacity and systems of government institutions that manages minerals sector. The elements of mineral governance include a) strengthening of information infrastructure facility, b) technological and legal capacities of state-owned mining companies to fully-engage with mining sponsors, c) government-led management of mining projects by supporting the project implementation units, d) government capacity in mineral management such as the control and monitoring of mining operations, and e) facilitation of regional and local development plans and its implementation with the private sector.

  12. IMIS, an integrated measuring and information system for environmental radioactivity monitoring

    International Nuclear Information System (INIS)

    Dornstetter, P.; Sell, J.; Schumacher, H.; Helms, D.

    1989-01-01

    The IMIS project system consists of a nationwide information network of interlinked data processing systems installed at 38 regional measuring stations, 11 regional data collecting centres, 5 key stations of the Federal German measuring network, 7 supervisory stations on Federal level, of the BMU, BMVg, and one central Federal office. The systems are equipped with VAX computers using the Ultric operating system and the ORACLE data base system. (DG) [de

  13. 3D fingerprint imaging system based on full-field fringe projection profilometry

    Science.gov (United States)

    Huang, Shujun; Zhang, Zonghua; Zhao, Yan; Dai, Jie; Chen, Chao; Xu, Yongjia; Zhang, E.; Xie, Lili

    2014-01-01

    As an unique, unchangeable and easily acquired biometrics, fingerprint has been widely studied in academics and applied in many fields over the years. The traditional fingerprint recognition methods are based on the obtained 2D feature of fingerprint. However, fingerprint is a 3D biological characteristic. The mapping from 3D to 2D loses 1D information and causes nonlinear distortion of the captured fingerprint. Therefore, it is becoming more and more important to obtain 3D fingerprint information for recognition. In this paper, a novel 3D fingerprint imaging system is presented based on fringe projection technique to obtain 3D features and the corresponding color texture information. A series of color sinusoidal fringe patterns with optimum three-fringe numbers are projected onto a finger surface. From another viewpoint, the fringe patterns are deformed by the finger surface and captured by a CCD camera. 3D shape data of the finger can be obtained from the captured fringe pattern images. This paper studies the prototype of the 3D fingerprint imaging system, including principle of 3D fingerprint acquisition, hardware design of the 3D imaging system, 3D calibration of the system, and software development. Some experiments are carried out by acquiring several 3D fingerprint data. The experimental results demonstrate the feasibility of the proposed 3D fingerprint imaging system.

  14. Evaluating Managerial Styles for System Development Life Cycle Stages to Ensure Software Project Success

    Science.gov (United States)

    Kocherla, Showry

    2012-01-01

    Information technology (IT) projects are considered successful if they are completed on time, within budget, and within scope. Even though, the required tools and methodologies are in place, IT projects continue to fail at a higher rate. Current literature lacks explanation for success within the stages of system development life-cycle (SDLC) such…

  15. A review of community-based solar home system projects in the Philippines

    Directory of Open Access Journals (Sweden)

    Macabebe Erees Queen B.

    2016-01-01

    Full Text Available Solar Home Systems (SHS are easy to deploy in island and in remote communities where grid connection is costly. However, issues related to maintenance of these systems emerge after they are deployed because of the remoteness and inaccessibility of the communities. This study looked into community-based programs in the Philippines and investigated the following: (1 social preparation, (2 role of the community in the project, and (3 sustainability of the program. In this paper, three communities under two government programs offering SHS are presented. These programs are the Solar Power Technology Support (SPOTS program of the Department of Agrarian Reform (DAR and the Household Electrification Program (HEP of the Department of Energy (DOE. A focused group discussion and key informant interviews were conducted in two communities in Bukidnon province and in a community in Kalinga to obtain information from the project beneficiaries and SHS users on the preparation, implementation and maintenance of the projects. The results revealed that emphasis on the economic value of the technology, proper training of the locals on the technical and management aspects of the project, as well as the establishment of a supply chain for replacement parts are crucial factors for the sustainability of the programs.

  16. Geoinformatics meets education for a peat bog information system

    Science.gov (United States)

    Michel, Ulrich; Fiene, Christina; Plass, Christian

    2010-10-01

    Within the project "Expedition Bog: Young researchers are experimenting, exploring and discovering" a bog-information- system is developed by the Department of Geography (University of Education Heidelberg, Germany), the Institute for Geoinformatics and Remote Sensing (University of Osnabrueck, Germany; the NABU Umweltpyramide gGmbH. This information system will be available for schools and to the public. It is supplemented by teaching units on various topics around the bog via an online platform. The focus of the project, however, is the original encounter with the bog habitat. This is realized by a GPS scavenger hunt with small research tasks and observations, mapping and experiments. The project areas are the Huvenhoops bog and the Lauenbruecker bog in Rotenburg in Lower Saxony, Germany. Equipped with a researcher backpack, GPS device and a mobile bog book by means of a pocket PC, students can discover different learning stations in the project bogs. In our areas the students can learn more about different topics such as "the historical memory of the bog", "water", "peat moss and other plants" and "animals of the bog". Moreover small inquiry research projects can be executed. Experimenting on site helps students to develop important scientific findings and increases their curiosity and enthusiasm for nature. It also promotes a number of other basic skills such as literacy, language skills, social skills or fine motor skills. Moreover it also fosters the development of a positive attitude to science in general. The main objective of the project is to promote sustainable environmental education, as well as the development of environmental awareness. This will be accomplished through the imparting of knowledge but also through experiencing nature with all senses in the context of original encounters.

  17. Drilling Information System (DIS and Core Scanner

    Directory of Open Access Journals (Sweden)

    Ronald Conze

    2016-04-01

    Full Text Available The Drilling Information System is a modular structure of databases, tailored user applications as well as web services and instruments including appropriate interfaces to DIS. This tool set has been developed for geoscientific drilling projects but is applicable to other distributed scientific operations. The main focuses are the data acquisition on drill sites (ExpeditionDIS, and the curation of sample material e.g., in core repositories (CurationDIS. Due to the heterogeneity of scientific drilling projects, a project-specific DIS is arranged and adjusted from a collection of existing templates and modules according to the user requirements during a one week training course. The collected data are provided to the Science Team of the drilling project by secured Web services, and stored in long-term archives hosted at GFZ. At the end the data sets and sample material are documented in an Operational Report (e.g., Lorenz et al., 2015 and published with assigned DOI (Digital Object Identifier and IGSN (International Geo Sample Number; for physical samples by GFZ Data Services.

  18. Liquid Effluent Monitoring Information System test plans releases 2.0 and 3.0

    International Nuclear Information System (INIS)

    Guettler, D.A.

    1995-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  19. Assessing the Alignment of Information Security with Strategic Business, and Strategic Information System Planning: A Department of Defense Perspective

    Science.gov (United States)

    2010-06-01

    Wolfgang. "Appraisal of the effectivness and efficiency of an Information Security Management System based on ISO 27001 ." International Conference on...of corporate information resources (Doherty and 29 Fulford, 2006) ( ISO /IEC 17799, 2005). Both public and private sectors of business have...Science Ltd, 2002. Iacovou, Charalambos L. "The IPACS project: when IT hits the fan." Journal of Information Technology, 1999: 267-275. ISO /IEC 17799

  20. Development of a geo-information system for the evaluation of active faults

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Sang Gi; Lim, Yu Jin [Paichai Univ., Taejon (Korea, Republic of)

    2001-04-15

    This project aims to develop an effective field system and database structure by analyzing the quantitative and qualitative geological data and establish its application plan. The contents and the scope of this study are as follows : developing a geo-information software, producing digital data from previous works and information-geological, age dating, trench information, topographic and geologic maps, establish a home page.

  1. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  2. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  3. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive

  4. Formal and informal land tenure systems in Afar region, Ethiopia ...

    African Journals Online (AJOL)

    commercial agriculture, land investments and development projects. Using data obtained ... tenure systems in Afar region, 2) to analyse the dynamics in land use and land administration from ..... According to the information obtained from the .... and land administration that take into account differences in economic, socio-.

  5. A scalable healthcare information system based on a service-oriented architecture.

    Science.gov (United States)

    Yang, Tzu-Hsiang; Sun, Yeali S; Lai, Feipei

    2011-06-01

    Many existing healthcare information systems are composed of a number of heterogeneous systems and face the important issue of system scalability. This paper first describes the comprehensive healthcare information systems used in National Taiwan University Hospital (NTUH) and then presents a service-oriented architecture (SOA)-based healthcare information system (HIS) based on the service standard HL7. The proposed architecture focuses on system scalability, in terms of both hardware and software. Moreover, we describe how scalability is implemented in rightsizing, service groups, databases, and hardware scalability. Although SOA-based systems sometimes display poor performance, through a performance evaluation of our HIS based on SOA, the average response time for outpatient, inpatient, and emergency HL7Central systems are 0.035, 0.04, and 0.036 s, respectively. The outpatient, inpatient, and emergency WebUI average response times are 0.79, 1.25, and 0.82 s. The scalability of the rightsizing project and our evaluation results show that the SOA HIS we propose provides evidence that SOA can provide system scalability and sustainability in a highly demanding healthcare information system.

  6. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    Energy Technology Data Exchange (ETDEWEB)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  7. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  8. A Concept of Constructing a Common Information Space for High Tech Programs Using Information Analytical Systems

    Science.gov (United States)

    Zakharova, Alexandra A.; Kolegova, Olga A.; Nekrasova, Maria E.

    2016-04-01

    The paper deals with the issues in program management used for engineering innovative products. The existing project management tools were analyzed. The aim is to develop a decision support system that takes into account the features of program management used for high-tech products: research intensity, a high level of technical risks, unpredictable results due to the impact of various external factors, availability of several implementing agencies. The need for involving experts and using intelligent techniques for information processing is demonstrated. A conceptual model of common information space to support communication between members of the collaboration on high-tech programs has been developed. The structure and objectives of the information analysis system “Geokhod” were formulated with the purpose to implement the conceptual model of common information space in the program “Development and production of new class mining equipment - “Geokhod”.

  9. EUGRIS: ''European Substainable Land and Groundwater Management Information System''

    Energy Technology Data Exchange (ETDEWEB)

    Frauenstein, J. [Federal Environmental Agency (UBA), Berlin (Germany)

    2003-07-01

    The presentation outlines and Accompanying Measure with the FP 5 to develop an web based EUropean Sustainable Land and GRoundwater Management Information System information system (EUGRIS). The management of contaminated land and groundwater requires an interdisciplinary approach and a considerable amount of supporting technical information and knowledge. EUGRIS will provide a generally available comprehensive and overarching information and innovation resource, to support both research and practical contaminated land and groundwater management. EUGRI is a gateway to provide a 'one stop shop' for information provided by research projects, legislation, standards, best practice and other technical guidance and policy/regulatory publications from the EC, participating Member and Accession States and from various international networks dealing with groundwater and land management issues. Different types of user can access information through different windows according to their needs. EUGRIS will provide its visitors with summary information (digests) and links to sources of more detailed and/or original information in a scaleable holistic and contexturally meaningful way. EUGRIS is being built in three stages: the design of the information system, the development of its software implementation, and the population of the system with information. The presentation is focussed on the concept of the development of the information system with the individual work packages. In the second part of the lecture in particular the work procedures are presented for the content wise replenishment by EUGRIS. The data collation for the proven pilot countries and the production of a European research data base, which opens contents and results of European-wide locked and current projects, form the emphasis thereby. (orig.)

  10. PRIDE Surveillance Projects Data Packaging Project Information Package Specification Version 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Kelleher, D. M.; Shipp, R. L.; Mason, J. D.

    2010-08-31

    Information Package Specification version 1.1 describes an XML document format called an information package that can be used to store information in information management systems and other information archives. An information package consists of package information, the context required to understand and use that information, package metadata that describes the information, and XML signatures that protect the information. The information package described in this specification was designed to store Department of Energy (DOE) and National Nuclear Security Administration (NNSA) information and includes the metadata required for that information: a unique package identifier, information marking that conforms to DOE and NNSA requirements, and access control metadata. It is an implementation of the Open Archival Information System (OAIS) Reference Model archival information package tailored to meet NNSA information storage requirements and designed to be used in the computing environments at the Y-12 National Security Complex and at other NNSA sites.

  11. Informed Systems: Enabling Collaborative Evidence Based Organizational Learning

    Directory of Open Access Journals (Sweden)

    Mary M. Somerville

    2015-12-01

    theoretical approach. Results – Over time and with practice, as co-workers design and enact information-focused and evidence based learning experiences, they learn the way to decision-making and action-taking. Increasingly more complex experiences of information exchange, sense making, and knowledge creation, well supported by workplace communication systems and professional practices, further dialogue and reflection and thereby enrich analysis and interpretation of complexities and interdependencies. Conclusions - Research projects and evaluation studies conducted since 2003 demonstrate the transformative potential of the holistic Informed Systems approach to creating robust workplace learning environments. Leaders are responsible for design of workplace environments supportive of well contextualized, information-rich conversations. Co-workers revisit both the nature of organizational information and the purpose of organizational work. As colleagues better understand the complexities of the organization and its situation, they learn to diagnose problems and identify consequences, guided by Informed Systems models. Systemic activity and process models activate collaborative evidence based information processes within enabling conditions for thought leadership and workplace learning that recognize learning is social. Enabling communication systems and professional practices therefore intentionally catalyze and support collegial inquiry to co-create information experiences and organizational knowledge through evidence based practice to enliven capacity, inform decisions, produce improvements, and sustain relationships. The Informed Systems approach is thereby a contribution to professional practice and workplace renewal through evidence based decision-making and action-taking in contemporary organizations.

  12. Nordic system for data and information exchange. Report from meetings with the authorities, and proposal for further work

    International Nuclear Information System (INIS)

    Walderhaug, T.; Rikisins, G.

    1996-11-01

    The EKO-4.2 project involves investigating approaches to setting up a new reliable system based on computer internet technology for exchange of information between the Nordic countries. According to the project plans this information exchange is to be based on bulletin board systems in the different countries. It was required that the system should not set any restriction of type of data or information to be exchanged, nor should it involve any standardization of data, and above all, it was not intended as an alert system. A bulletin board system is passive in the sense that no information is actually sent, instead it is the receiver who is responsible for approaching the information and transferring it to own system. This feature makes the system unsuitable for alert purposes. Since a potential system will have to be implemented by the authorities in the respective countries, the first part of the project was to survey their interest and emphasis. This was done in meetings in the different countries. The conclusion from those meetings was an overall interest in establishing a system as described, and several requirements concerning security and reliability of the system were proposed. The implication of the requirements by the authorities is discussed and a practical solution of an information exchange system based on the World Wide Web (WWW), the File Transfer Protocol (FTP), and the Internet is outlined. The continuation of the project must be based on operable servers in the different countries, whose configuration and connection with the local network are the responsibility of the institution owning the server. The selected system will depend on hardware and on the overall security policy of the institution involved. It is proposed that further work concentrates on a general testing of the system, standardizing of server user interfaces and testing of encryption software for transfer of passwords. (au)

  13. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  14. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  15. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Science.gov (United States)

    Bril, Aleksander; Kalinina, Olga; Levina, Anastasia

    2018-03-01

    The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.

  16. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Directory of Open Access Journals (Sweden)

    Bril Aleksander

    2018-01-01

    Full Text Available The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.

  17. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  18. Computer-Aided Systems Engineering for Flight Research Projects Using a Workgroup Database

    Science.gov (United States)

    Mizukami, Masahi

    2004-01-01

    An online systems engineering tool for flight research projects has been developed through the use of a workgroup database. Capabilities are implemented for typical flight research systems engineering needs in document library, configuration control, hazard analysis, hardware database, requirements management, action item tracking, project team information, and technical performance metrics. Repetitive tasks are automated to reduce workload and errors. Current data and documents are instantly available online and can be worked on collaboratively. Existing forms and conventional processes are used, rather than inventing or changing processes to fit the tool. An integrated tool set offers advantages by automatically cross-referencing data, minimizing redundant data entry, and reducing the number of programs that must be learned. With a simplified approach, significant improvements are attained over existing capabilities for minimal cost. By using a workgroup-level database platform, personnel most directly involved in the project can develop, modify, and maintain the system, thereby saving time and money. As a pilot project, the system has been used to support an in-house flight experiment. Options are proposed for developing and deploying this type of tool on a more extensive basis.

  19. WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

    International Nuclear Information System (INIS)

    Zhang, H; Kong, V; Jin, J; Ren, L; Zhang, Y; Giles, W

    2015-01-01

    Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose

  20. WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, H; Kong, V; Jin, J [Georgia Regents University Cancer Center, Augusta, GA (Georgia); Ren, L; Zhang, Y; Giles, W [Duke University Medical Center, Durham, NC (United States)

    2015-06-15

    Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose.

  1. Data Entities and Information System Matrix for Integrated Agriculture Information System (IAIS)

    Science.gov (United States)

    Budi Santoso, Halim; Delima, Rosa

    2018-03-01

    Integrated Agriculture Information System is a system that is developed to process data, information, and knowledge in Agriculture sector. Integrated Agriculture Information System brings valuable information for farmers: (1) Fertilizer price; (2) Agriculture technique and practise; (3) Pest management; (4) Cultivation; (5) Irrigation; (6) Post harvest processing; (7) Innovation in agriculture processing. Integrated Agriculture Information System contains 9 subsystems. To bring an integrated information to the user and stakeholder, it needs an integrated database approach. Thus, researchers describes data entity and its matrix relate to subsystem in Integrated Agriculture Information System (IAIS). As a result, there are 47 data entities as entities in single and integrated database.

  2. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  3. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  4. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  5. Materials information for science and technology (MIST): Project overview: Phases I and II and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-01-01

    This report documents the initial phases of the Materials Information for Science and Technology (MIST) project jointly supported by the Department of Energy and the National Bureau of Standards. The purpose of MIST is to demonstrate the power and utility of computer access to materials property data. The initial goals include: to exercise the concept of a computer network of materials databases and to build a demonstration of such a system suitable for use as the core of operational systems in the future. Phases I and II are described in detail herein. In addition, a discussion is given of the expected usage of the system. The primary MIST prototype project is running on an IBM 3084 under STS at the Stanford University's Information Technology Services (ITS). Users can access the Stanford system via ARPANET, TELENET, and TYMNET, as well as via commercial telephone lines. For fastest response time and use of the full screen PRISM interface, direct connection using a 2400 baud modem with the MNP error-correcting protocol over standard telephone lines gives the best results - though slower speed connections and a line-oriented interface are also available. This report gives detailed plans regarding the properties to be enterend and the materials to be entered into the system.

  6. An information management system for a spent nuclear fuel interim storage facility

    International Nuclear Information System (INIS)

    Horak, K.; Giles, T.; Finch, R.; Jow, H.N.; Chiu, H.L.

    2010-01-01

    We describe an integrated information management system for an independent spent fuel dry-storage installation (ISFSI) that can provide for (1) secure and authenticated data collection, (2) data analysis, (3) dissemination of information to appropriate stakeholders via a secure network, and (4) increased public confidence and support of the facility licensing and operation through increased transparency. This information management system is part of a collaborative project between Sandia National Laboratories, Taiwan Power Co., and the Fuel Cycle Materials Administration of Taiwan's Atomic Energy Council, which is investigating how to implement this concept.

  7. An information management system for a spent nuclear fuel interim storage facility.

    Energy Technology Data Exchange (ETDEWEB)

    Finch, Robert J.; Chiu, Hsien-Lang (Taiwan Power Co., Taipei, 10016 Taiwan); Giles, Todd; Horak, Karl Emanuel; Jow, Hong-Nian (Jow International, Kirkland, WA)

    2010-12-01

    We describe an integrated information management system for an independent spent fuel dry-storage installation (ISFSI) that can provide for (1) secure and authenticated data collection, (2) data analysis, (3) dissemination of information to appropriate stakeholders via a secure network, and (4) increased public confidence and support of the facility licensing and operation through increased transparency. This information management system is part of a collaborative project between Sandia National Laboratories, Taiwan Power Co., and the Fuel Cycle Materials Administration of Taiwan's Atomic Energy Council, which is investigating how to implement this concept.

  8. A survey of the use of database management systems in accelerator projects

    CERN Document Server

    Poole, John

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accelerator projects and what they are being used for. Initially introduced to handle equipment builders' data, commercial DBMS are now being used in almost all areas of accelerators from on-line control to personnel data. A variety of commercial systems are being used in conjunction with a diverse selection of application software for data maintenance/manipulation and controls. This paper reviews the database activities known to IADBG.

  9. Integrated Information Systems Across the Weather-Climate Continuum

    Science.gov (United States)

    Pulwarty, R. S.; Higgins, W.; Nierenberg, C.; Trtanj, J.

    2015-12-01

    The increasing demand for well-organized (integrated) end-to-end research-based information has been highlighted in several National Academy studies, in IPCC Reports (such as the SREX and Fifth Assessment) and by public and private constituents. Such information constitutes a significant component of the "environmental intelligence" needed to address myriad societal needs for early warning and resilience across the weather-climate continuum. The next generation of climate research in service to the nation requires an even more visible, authoritative and robust commitment to scientific integration in support of adaptive information systems that address emergent risks and inform longer-term resilience strategies. A proven mechanism for resourcing such requirements is to demonstrate vision, purpose, support, connection to constituencies, and prototypes of desired capabilities. In this presentation we will discuss efforts at NOAA, and elsewhere, that: Improve information on how changes in extremes in key phenomena such as drought, floods, and heat stress impact management decisions for resource planning and disaster risk reduction Develop regional integrated information systems to address these emergent challenges, that integrate observations, monitoring and prediction, impacts assessments and scenarios, preparedness and adaptation, and coordination and capacity-building. Such systems, as illustrated through efforts such as NIDIS, have strengthened the integration across the foundational research enterprise (through for instance, RISAs, Modeling Analysis Predictions and Projections) by increasing agility for responding to emergent risks. The recently- initiated Climate Services Information System, in support of the WMO Global Framework for Climate Services draws on the above models and will be introduced during the presentation.

  10. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  11. Landsat Pathfinder tropical forest information management system

    Science.gov (United States)

    Salas, W.; Chomentowski, W.; Harville, J.; Skole, D.; Vellekamp, K.

    1994-01-01

    A Tropical Forest Information Management System_(TFIMS) has been designed to fulfill the needs of HTFIP in such a way that it tracks all aspects of the generation and analysis of the raw satellite data and the derived deforestation dataset. The system is broken down into four components: satellite image selection, processing, data management and archive management. However, as we began to think of how the TFIMS could also be used to make the data readily accessible to all user communities we realized that the initial system was too project oriented and could only be accessed locally. The new system needed development in the areas of data ingest and storage, while at the same time being implemented on a server environment with a network interface accessible via Internet. This paper summarizes the overall design of the existing prototype (version 0) information management system and then presents the design of the new system (version 1). The development of version 1 of the TFIMS is ongoing. There are no current plans for a gradual transition from version 0 to version 1 because the significant changes are in how the data within the HTFIP will be made accessible to the extended community of scientists, policy makers, educators, and students and not in the functionality of the basic system.

  12. Addressing critical issues in the development of an Oncology Information System.

    Science.gov (United States)

    Urda, D; Ribelles, N; Subirats, J L; Franco, L; Alba, E; Jerez, J M

    2013-05-01

    This paper presents the experience on the design and implementation of a user-centered Oncology Information System developed for the Medical Oncology Department at the "Hospital Universitario Virgen de la Victoria", in Málaga, Spain. The project focused on the aspects considered in the literature as critical factors for a successful deployment and usage of a health information system. System usability, adequate technology, integration of clinical routines, real-time statistical analysis of data, information confidentiality and standard protocol-based external interconnection were the key aspects considered. The developed system is based on a web application with a modular and layered architecture accounting for usability, ease of maintenance and further system development. Evaluation of system usability was carried at three and fifteen months after system deployment to analyze the advantages/disadvantages experienced by the end-users. A thorough prior analysis of clinical activities and workflows, the use of the adequate technology, and the availability of data analysis tools will almost guarantee success in the deployment of an Oncology Information System. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  13. Majority of Enterprise Resource Planning (ERP) Projects Fail--M-DCPS Is a Rare Exception. Information Capsule. Volume 1108

    Science.gov (United States)

    Blazer, Christie

    2012-01-01

    A high percentage of ERP projects are classified as failures, leaving organizations with only partially functioning systems or, worse yet, with no ERP systems at all. Those that do succeed usually take significantly longer than expected and encounter staggering budget overruns. This Information Capsule summarizes 10 high profile ERP implementation…

  14. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  15. Application of PMU-Based Information in the Indian Power System

    Science.gov (United States)

    Agarwal, P. K.; Agarwal, V. K.; Rathour, Harish

    2013-05-01

    SCADA/EMS system has been the most commonly used tool for real-time power system operation and control throughout the world. This system has been found to be very useful in steady-state analysis of the power system. The ever-increasing dependence of human society and every country's economy on electrical energy calls for reliable power delivery. In order to meet these expectations, engineers across the globe have been exploring such new technologies that can improve upon the limitations of SCADA and provide dynamic visibility of the power system. A breakthrough has now been achieved in the form of synchrophasor technology. Synchrophasor measurements using phasor measurement units (PMUs) deployed over a wide area, facilitate dynamic state measurement and visualization of a power system, which are useful in monitoring safety and security of the grid. The Power System Operation Corporation (POSOCO) has taken initiative and implemented a pilot project wherein nine phasor measurement units (PMUs) along with one phasor data concentrator (PDC) were commissioned in the Northern Region (NR) of India. The primary objective of this pilot project was to comprehend the synchrophasor technology and its applications in power system operation. The data received and information derived from the pilot project have been found to be very useful and helped in improving the performance of the grid operation in several ways. The pilot project is operational for the last two years; in the meanwhile, many other initiatives have also been taken in other regions by POSOCO. This article details the utilization of the data collected from the pilot projects and the application of the data in the improvement of Indian power grid.

  16. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  17. International Virtual Observatory System for Water Resources Information

    Science.gov (United States)

    Leinenweber, Lewis; Bermudez, Luis

    2013-04-01

    Sharing, accessing, and integrating hydrologic and climatic data have been identified as a critical need for some time. The current state of data portals, standards, technologies, activities, and expertise can be leverage to develop an initial operational capability for a virtual observatory system. This system will allow to link observations data with stream networks and models, and to solve semantic inconsistencies among communities. Prototyping a virtual observatory system is an inter-disciplinary, inter-agency and international endeavor. The Open Geospatial Consortium (OGC) within the OGC Interoperability Program provides the process and expertise to run such collaborative effort. The OGC serves as a global forum for the collaboration of developers and users of spatial data products and services, and to advance the development of international standards for geospatial interoperability. The project coordinated by OGC that is advancing an international virtual observatory system for water resources information is called Climatology-Hydrology Information Sharing Pilot, Phase 1 (CHISP-1). It includes observations and forecasts in the U.S. and Canada levering current networks and capabilities. It is designed to support the following use cases: 1) Hydrologic modeling for historical and near-future stream flow and groundwater conditions. Requires the integration of trans-boundary stream flow and groundwater well data, as well as national river networks (US NHD and Canada NHN) from multiple agencies. Emphasis will be on time series data and real-time flood monitoring. 2) Modeling and assessment of nutrient load into the lakes. Requires accessing water-quality data from multiple agencies and integrating with stream flow information for calculating loads. Emphasis on discrete sampled water quality observations, linking those to specific NHD stream reaches and catchments, and additional metadata for sampled data. The key objectives of these use cases are: 1) To link

  18. Report: EPA Needs to Improve Oversight of Its Information Technology Projects

    Science.gov (United States)

    Report #2005-P-00023, September 14, 2005. EPA’s Office of Environmental Information (OEI) did not sufficiently oversee information technology projects to ensure they met planned budgets and schedules.

  19. Implementation HR information system – part of a unified information environment of MPEI

    Directory of Open Access Journals (Sweden)

    I. M. Krepkov

    2016-01-01

    Full Text Available The article is devoted to the unified information environment of National Research University “Moscow Power Engineering Institute” (MPEI, and its most important component – the HR information system. The article describes the architecture of the unified information space of MPEI. The main objective of the development of the HR information system – to provide access to users, including other information systems, to actual information about employees of MPEI.HR information system are based on many years of operating experience of the previous system and the like, are available on the market today, taking into account the decisions of personnel. The earlier HR information system was developed in 1995–1997 and used until mid-2015. In the process of its using it has accumulated a large number of «patches» and requests for revision that was stopped by limitations in the platform and solutions architecture. Comparative analysis of 1C and SAP products showed that the cost of implementation, configuration and maintenance of these products is higher than developing new solutions. Package of Microsoft technology software was chosen as a platform. These technologies have proven themselves in the development of similar projects, and vendor solutions for a long time support all key processes of information systems. Important is the presence of the selected software Microsoft FSTEC certificates (Federal Service for Technical and Export Control, which support the use of these products for storing and processing information in accordance with the laws of the Russian Federation. The MPEI has already implemented a number of systems on the Microsoft platform – postgraduate register, an Internet portal, etc. The use of technology of one supplier facilitates the integration processes and products into a unified information environment. The article details the technical and hardware specifications of the HR information system. The result of the work on

  20. Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-211. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  1. a Cultural Landscape Information System Developed with Open Source Tools

    Science.gov (United States)

    Chudyk, C.; Müller, H.; Uhler, M.; Würriehausen, F.

    2013-07-01

    Since 2010, the state of Rhineland-Palatinate in Germany has developed a cultural landscape information system as a process to secure and further enrich aggregate data about its cultural assets. In an open dialogue between governing authorities and citizens, the intention of the project is an active cooperation of public and private actors. A cultural landscape information system called KuLIS was designed as a web platform, combining semantic wiki software with a geographic information system. Based on data sets from public administrations, the information about cultural assets can be extended and enhanced by interested participants. The developed infrastructure facilitates local information accumulation through a crowdsourcing approach. This capability offers new possibilities for e-governance and open data developments. The collaborative approach allows governing authorities to manage and supervise official data, while public participation enables affordable information acquisition. Gathered cultural heritage information can provide incentives for touristic valorisation of communities or concepts for strengthening regional identification. It can also influence political decisions in defining significant cultural regions worth of protecting from industrial influences. The presented cultural landscape information allows citizens to influence the statewide development of cultural landscapes in a democratic way.

  2. Clinical information system based on the medical smart card.

    Science.gov (United States)

    Danon, Y L; Saiag, E

    2000-07-01

    Over the last 5 years Israel has implemented a nationwide health insurance plan covering the entire population of the country. We have developed a clinical information system based on electronic-chip health care medical smart cards. Health care cards are used in several European countries and chip smart cards have been successful in many sectors. Our project involves the community use of the MSC, thereby enabling health care professionals to skillfully employ card systems in the health care sector. This system can easily arrange electronic medical charts in clinics, facilitating the confidential sharing of personal health databases among health professionals. To develop an MSC applicable for daily use in the community and hospital system. The MSC project, currently underway in Israel and the USA, will aid in determining the costs, benefits and feasibility of the MSC. Successful implementation of the MSC in chosen clinics will promote a nationwide willingness to adopt this promising technology.

  3. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2013-02-06

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave... to industry's drug development processes and (2) a venue for sharing information about project...

  4. Empowering Students in Information Literacy Practices Using a Collaborative Digital Library for School Projects

    Directory of Open Access Journals (Sweden)

    Abrizah Abdullah

    2008-09-01

    Full Text Available This paper examines the affordances that a collaborative digital library (CDL can bring to bear on supporting information literacy practices in the digital information environment. It suggests that the digital library can contribute to student empowerment in information literacy practices while searching, using and collaboratively building the digital library resources. To illustrate this, the authors have been experimenting with the implementation of an integrated information literacy model based on Eisenberg and Berkowitz’ Big 6 Model and describes the CDL features in association with the information literacy dimensions in this model. The CDL focuses on the project-based learning approach to conduct students’ project, which supports specific information behaviors that underpin research and learning such as information seeking, browsing, encountering, foraging, sharing, gathering, filtering, and using. Findings regarding teachers’ reception of the digital library are encouraging as they feel the relevance of the digital library to the current requirement of the students’ project and its potential to entrench information and resource study skills through project-based learning.

  5. Why Phishing Works: Project for an Information Security Capstone Course

    Science.gov (United States)

    Pollacia, Lissa; Ding, Yan Zong; Yang, Seung

    2015-01-01

    This paper presents a project which was conducted in a capstone course in Information Security. The project focused on conducting research concerning the various aspects of phishing, such as why phishing works and who is more likely to be deceived by phishing. Students were guided through the process of conducting research: finding background and…

  6. Community-Level Impacts Projection System (CLIPS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Monts, J.K.; Bareiss, E.R.

    1979-02-01

    The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands and spatial location; to estimate how many in-migrating workers will be required; to estimate the demographic characteristics of the in-migrating workers (e.g., how many elementary school children they will bring); to estimate how many additional secondary employment opportunities (e.g., employment in eating and drinking establishments and grocery stores) will be generated; to estimate what the local area's population levels in various age groups would be both with the project and without it; to estimate community population levels for both the impact case and the baseline case; and to estimate the approximate resource requirements and costs for providing additional municipal facilities and services (e.g., water treatment and distribution, wastewater treatment and collection, gas and electric distribution, police and fire protection, etc.)

  7. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  8. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  9. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  10. A state-of-the-art production information management system: Conception to completion

    International Nuclear Information System (INIS)

    Parker, A.R.; Corston, S.P.; Abdallah, F.F.

    1994-01-01

    The task of hydrocarbon production accounting for oil and gas development projects can be extremely complex and time consuming, especially if Joint Venture Partner (JVP) ownership varies over several inter-related producing projects. For this task to be carried out quickly and accurately a diverse range of computer software and hardware is usually employed. This paper explains the planning, specifications and construction of an online Management Information System for hydrocarbon production balancing, reconciliation and reporting over the North West Shelf Gas Project

  11. A state-of-the-art production information management system: Conception to completion

    Energy Technology Data Exchange (ETDEWEB)

    Parker, A.R.; Corston, S.P.; Abdallah, F.F.

    1994-12-31

    The task of hydrocarbon production accounting for oil and gas development projects can be extremely complex and time consuming, especially if Joint Venture Partner (JVP) ownership varies over several inter-related producing projects. For this task to be carried out quickly and accurately a diverse range of computer software and hardware is usually employed. This paper explains the planning, specifications and construction of an online Management Information System for hydrocarbon production balancing, reconciliation and reporting over the North West Shelf Gas Project.

  12. The interplay between formal and informal contracting in integrated project delivery

    NARCIS (Netherlands)

    Bygballe, L.E.; Dewulf, Geert P.M.R.; Levitt, R.

    2015-01-01

    This research examines the interplay between formal and informal contracting in integrated project delivery (IPD). It investigates how the interplay enables parties in health-care construction projects to cope with uncertainty and complexities, due to, among others, changing demands. New delivery

  13. Using hub technology to facilitate information system integration in a health-care enterprise.

    Science.gov (United States)

    Gendler, S M; Friedman, B A; Henricks, W H

    1996-04-01

    The deployment and maintenance of multiple point-to-point interfaces between a clinical information system, such as a laboratory information system, and other systems within a healthcare enterprise is expensive and time consuming. Moreover, the demand for such interfaces is increasing as hospitals consolidate and clinical laboratories participate in the development of regional laboratory networks and create host-to-host links with laboratory outreach clients. An interface engine, also called a hub, is an evolving technology that could replace multiple point-to-point interfaces from a laboratory information system with a single interface to the hub, preferably HL7 based. The hub then routes and translates laboratory information to other systems within the enterprise. Changes in application systems in an enterprise where a centralized interface engine has been implemented then amount to thorough analysis, an update of the enterprise's data dictionary, purchase of a single new vendor-supported interface, and table-based parameter changes on the hub. Two other features of an interface engine, support for structured query language and information store-and-forward, will facilitate the development of clinical data repositories and provide flexibility when interacting with other host systems. This article describes the advantages and disadvantages of an interface engine and lists some problems not solved by the technology. Finally, early developmental experience with an interface engine at the University of Michigan Medical Center and the benefits of the project on system integration efforts are described, not the least of which has been the enthusiastic adoption of the HL7 standard for all future interface projects.

  14. A state-of-the-art report on international nuclear information system

    International Nuclear Information System (INIS)

    Lee, Sung Ho; Keum, Jong Yong

    1997-02-01

    INIS (International Nuclear Information System) established in 1969 by IAEA, is the world's leading information system for the peaceful uses of nuclear energy in collaboration with its 98 member states and 17 international organizations. As a member state, Korea has participated in the INIS activities from the beginning of INIS establishment. The technical information department of KAERI plays the role of the National Center of the Republic of Korea. The purpose of this study is to prepare the method for the activation of domestic INIS operation. To accomplish the purpose, we investigated and analyzed the status of INIS, domestic INIS activities, and the recent INIS projects. Especially some projects are expected to influence domestic INIS activities deeply in the near future. The analyzed results show that for better INIS activities in Korea, we need to review politically and technically on the methods to amplify the rate of the INIS input, to construct and manage the INIS local host, and to use the source documents on CD-ROMs. (author). 24 refs., 6 tabs., 6 figs

  15. An information system for the building industries: A communication approach based on industrial components

    Directory of Open Access Journals (Sweden)

    A F Cutting-Decelle

    2006-01-01

    Full Text Available This paper presents the SYDOX/MATCOMP/Xi project, funded by the French Ministry of Industry. The goal of the project was to provide the construction professionals with an on-line aid for component specification and selection at different levels of the construction life cycle. This two years project started in 1997 and involved several partners. This paper describes the main features of the information system: databases, query and communication systems. SYDOX(SYstème de DOnnées compleXes is aimed at defining and demonstrating a prototype to access information about MATerials and COMPonents used in construction, implemented on a WWW server. Though the objective is general, the work was focused on a restricted sub-section of the construction domain. We describe the domain and the scope of the project, the starting point and the lessons learnt from the development of the prototype. We also propose some important ideas on which this research is based.

  16. Integrated monitoring and information systems for managing aquatic invasive species in a changing climate

    Science.gov (United States)

    Lee, Henry; Reusser, Deborah A.; Olden, Julian D.; Smith, Scott S.; Graham, Jim; Burkett, Virginia; Dukes, Jeffrey S.; Piorkowski, Robert J.; Mcphedran, John

    2008-01-01

    Changes in temperature, precipitation, and other climatic drivers and sea-level rise will affect populations of existing native and non-native aquatic species and the vulnerability of aquatic environments to new invasions. Monitoring surveys provide the foundation for assessing the combined effects of climate change and invasions by providing baseline biotic and environmental conditions, although the utility of a survey depends on whether the results are quantitative or qualitative, and other design considerations. The results from a variety of monitoring programs in the United States are available in integrated biological information systems, although many include only non-native species, not native species. Besides including natives, we suggest these systems could be improved through the development of standardized methods that capture habitat and physiological requirements and link regional and national biological databases into distributed Web portals that allow drawing information from multiple sources. Combining the outputs from these biological information systems with environmental data would allow the development of ecological-niche models that predict the potential distribution or abundance of native and non-native species on the basis of current environmental conditions. Environmental projections from climate models can be used in these niche models to project changes in species distributions or abundances under altered climatic conditions and to identify potential high-risk invaders. There are, however, a number of challenges, such as uncertainties associated with projections from climate and niche models and difficulty in integrating data with different temporal and spatial granularity. Even with these uncertainties, integration of biological and environmental information systems, niche models, and climate projections would improve management of aquatic ecosystems under the dual threats of biotic invasions and climate change

  17. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  18. [An information system for injuries from external causes (SILEX): a successful project in El Salvador].

    Science.gov (United States)

    Salinas, Oscar; de Cosío, Gerardo; Clavel-Arcas, Carme; Montoya, Jeannette; Serpas, Mario; Morán de García, Silvia; Concha-Eastman, Alberto

    2008-12-01

    This article examines the stages in developing an information system for injuries from external causes (Sistema de Información de Lesiones de Causa Externa-SILEX), as well as its limitations and achievements. SILEX is a Web-based application for collection, quality control, presentation, and analysis of data available from the hospital system for surveillance of injuries from external causes created by Ministry of Health of El Salvador with data from the hospital emergency services. This system maintains comprehensive information on the injured person-type of injury, intention, injury site, activity being performed at the time of injury, risk factors, etc.-in the form of tables, graphs, and maps, which streamlines the development of intervention plans and prevention initiatives for these types of injuries in El Salvador. This experience is an example of what can be done to close the information gap on injuries by external causes in the Region of the Americas.

  19. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  20. The intellectual core of enterprise information systems: a co-citation analysis

    Science.gov (United States)

    Shiau, Wen-Lung

    2016-10-01

    Enterprise information systems (EISs) have evolved in the past 20 years, attracting the attention of international practitioners and scholars. Although literature reviews and analyses have been conducted to examine the multiple dimensions of EISs, no co-citation analysis has been conducted to examine the knowledge structures involved in EIS studies; thus, the current study fills this research gap. This study investigated the intellectual structures of EISs. All data source documents (1083 articles and 24,090 citations) were obtained from the Institute for Scientific Information Web of Knowledge database. A co-citation analysis was used to analyse EIS data. By using factor analysis, we identified eight critical factors: (a) factors affecting the implementation and success of information systems (ISs); (b) the successful implementation of enterprise resource planning (ERP); (c) IS evaluation and success, (d) system science studies; (e) factors influencing ERP success; (f) case research and theoretical models; (g) user acceptance of information technology; and (h) IS frameworks. Multidimensional scaling and cluster analysis were used to visually map the resultant EIS knowledge. It is difficult to implement an EIS in an enterprise and each organisation exhibits specific considerations. The current findings indicate that managers must focus on ameliorating inferior project performance levels, enabling a transition from 'vicious' to 'virtuous' projects. Successful EIS implementation yields substantial organisational advantages.