  1. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  2. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  3. Knowledge Creation Through Development Projects

    DEFF Research Database (Denmark)

    Laursen, Erik

    2010-01-01

    The focus of the paper is set on efforts to produce and manage organizational learning and development through engagement in organizational development projects, involving the implementation of new methods, new technologies and new ways of organizing the work processes. The issues discussed...... study of four organizational development projects (covering the organizations as a whole) held by four Danish High Schools (“gymnasium”). The study included questionnaires as well as interviews with the management and staff, plus a survey of selected written materials and documents. The purpose...... of the paper is to describe the activities, actually organized by the projects., as well as the various ways in which different groupings among the staff and the management are relating to the project. A special focus is set on the different perspectives on the projects established by the staff...

  4. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  5. Energy Efficiency Project Development

    Energy Technology Data Exchange (ETDEWEB)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1

  6. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  7. Status of LMFBR development project in Japan

    International Nuclear Information System (INIS)

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  8. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  9. Developing Government Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  10. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  11. US heat pump research and development projects, 1976-1986

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  12. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    as a source of CO 2 emission. A separate chapter is dedicated to each of these sectors. However, the report starts with a summary of the emissions with a section for each of the pollutants treated. At the end of each of these section the main differences between the present calculation and the values in Denmark's Second National Communication on Climate Change are described shortly. For each of the pollutants the development of the emissions in the period 1972-2012 and the various emission targets in Danish sector plants or international conventions are shown on a figure. Below the figures the emissions for the main emitting sectors are shown in a table. The years shown in these tables are not the same for all pollutants. When a column is marked with '2010' it means that the values in the columns are averaged over the first commitment period 2008-2012. It is not possible in this report to present all the data from the emission calculations. The data is contained in an EXEL notebook model. Appendix 1 contains a table with time-series for 1975-2012 for the greenhouse gases CO 2 , CH 4 and N 2 O for all emitting sectors. In Appendix 2 the results of the projections 2000-2012 are shown in the IPCC/CRF Sectoral Tables format in CO 2 equivalents for each greenhouse gas and in total (only source and sink categories with greenhouse gas emissions or removals are shown). The model is structured as a set of worksheets for the primary energy consuming sector and the model contains similar sets for each of the pollutants. Additional sheets have been included for the relevant pollutants, where emissions originate from non-combustion processes. Each of these spreadsheets contains time-series for the emissions from each of the primary fuels consumed in the sector. (ba)

  13. Balbina's region sustainable development project

    International Nuclear Information System (INIS)

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  14. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  15. Minerals and energy: major development projects - April 2005 listing

    Energy Technology Data Exchange (ETDEWEB)

    Ian Haine (and others) [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2005-06-01

    The article describes trends in project development and investment in the minerals and energy sector in Australia. It lists competed projects and committed projects. Black coal projects completed during November 2004 to April 2005 were: Dendrobium underground and Mandalong longwall mining expansion projects in New South Wales and development of Curragh North and Eaglefield opencut mine in Queensland. One of the more significant newly listed projects is Macarthur Coal's Queensland Coke Project near Rockhampton. Capital cost and values of projects are included. The full listing of 229 projects is available electronically from ABARE. The list is released around May and November each year. 10 figs., 4 tabs.

  16. Examining Thai high school students' developing STEM projects

    Science.gov (United States)

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  17. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  18. Development and implementation of a residency project advisory board.

    Science.gov (United States)

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  19. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  20. Co-benefits of including CCS projects in the CDM in India's power sector

    International Nuclear Information System (INIS)

    Eto, R.; Murata, A.; Uchiyama, Y.; Okajima, K.

    2013-01-01

    This study examines the effects of the inclusion of the co-benefits on the potential installed capacity of carbon dioxide capture and storage (CCS) projects with a linear programming model by the clean development mechanism (CDM) in India's power sector. It is investigated how different marginal damage costs of air pollutants affect the potential installed capacity of CCS projects in the CDM with a scenario analysis. Three results are found from this analysis. First, large quantity of IGCC with CCS becomes realizable when the certified emission reduction (CER) prices are above US$56/tCO 2 in the integrated Northern, Eastern, Western, and North-Eastern regional grids (NEWNE) and above US $49/tCO 2 in the Southern grid. Second, including co-benefits contributes to decrease CO 2 emissions and air pollutants with introduction of IGCC with CCS in the CDM at lower CER prices. Third, the effects of the co-benefits are limited in the case of CCS because CCS reduces larger amount of CO 2 emissions than that of air pollutants. Total marginal damage costs of air pollutants of US$250/t and US$200/t lead to CER prices of US$1/tCO 2 reduction in the NEWNE grid and the Southern grid. - Highlights: • We estimate effects of co-benefits on installed capacity of CCS projects in the CDM. • We develop a linear programming (LP) model of two grids of India. • Including co-benefits contributes to introduce IGCC with CCS in the CDM at lower CER prices

  1. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  2. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    solvent use and other sources is included as a souce of CO{sub 2} emission. A separate chapter is dedicated to each of these sectors. However, the report starts with a summary of the emissions with a section for each of the pollutants treated. At the end of each of these section the main differences between the present calculation and thevalues in Denmark's Second National Communication on Climate Change are described shortly. For each of the pollutants the development of the emissions in the period 1972-2012 and the various emission targets in Danish sector plants or international conventions are shown on a figure. Below the figures the emissions for the main emitting sectors are shown in a table. The years shown in these tables are not the same for all pollutants. When a column is marked with '2010' it means that the values in the columns are averaged over the first commitment period 2008-2012. It is not possible in this report to present all the data from the emission calculations. The data is contained in an EXEL notebook model. Appendix 1 contains a table with time-series for 1975-2012 for the greenhouse gases CO{sub 2}, CH{sub 4} and N{sub 2}O for all emitting sectors. In Appendix 2 the results of the projections 2000-2012 are shown in the IPCC/CRF Sectoral Tables format in CO{sub 2} equivalents for each greenhouse gas and in total (only source and sink categories with greenhouse gas emissions or removals are shown). The model is structured as a set of worksheets for the primary energy consuming sector and the model contains similar sets for each of the pollutants. Additional sheets have been included for the relevant pollutants, where emissions originate from non-combustion processes. Each of these spreadsheets contains time-series for the emissions from each of the primary fuels consumed in the sector. (ba)

  3. Wake models developed during the Wind Shadow project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, S.; Ott, S.; Pena, A.; Berg, J.; Nielsen, M.; Rathmann, O.; Joergensen, H.

    2011-11-15

    The Wind Shadow project has developed and validated improved models for determining the wakes losses, and thereby the array efficiency of very large, closely packed wind farms. The rationale behind the project has been that the existing software has been covering these types of wind farms poorly, both with respect to the densely packed turbines and the large fetches needed to describe the collective shadow effects of one farm to the next. Further the project has developed the necessary software for the use of the models. Guidelines with recommendations for the use of the models are included in the model deliverables. The project has been carried out as a collaborative project between Risoe DTU, DONG, Vattenfall, DNV and VESTAS, and it has been financed by energinet.dk grant no. 10086. (Author)

  4. Hualapai Tribal Utility Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Hualapai Tribal Nation

    2008-05-25

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon

  5. Generation project development opportunities in Latin America

    International Nuclear Information System (INIS)

    Carter, R.W.

    1993-01-01

    This presentation addresses the pitfalls and benefits of developing power generation projects in Latin America. The topics of the presentation include the countries where there is opportunity for development, the opportunities that exist in these countries, the influence of geographic proximity, and competition from the Far East and the European Community

  6. Development of a major hydroelectric project in the Pacific Rim

    International Nuclear Information System (INIS)

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  7. The advanced software development workstation project

    Science.gov (United States)

    Fridge, Ernest M., III; Pitman, Charles L.

    1991-01-01

    The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

  8. The Development of Digital Collections and Resources Organization Related Projects in Taiwan

    Directory of Open Access Journals (Sweden)

    Hsueh-Hua Chen

    2001-12-01

    Full Text Available With the development of Internet, digital libraries/museums have received worldwide attention and many developed countries are doing extensive researches on digital libraries/museums. In Taiwan, many institutions have digitized their rare collections. This paper introduces the recent development of digital projects in Taiwan, including: Digital Museum Project, National Digital Collection Project and National Culture Database Project, and also especially introduces some resources organization related projects. [Article content in Chinese

  9. Roadmap for biofertilizer development project at Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Khairuddin Abdul Rahim; Ahmad Nazrul Abd Wahid; Phua Choo Kwai Hoe; Pauline Liew Woan Ying; Ahamad Sahali Mardi; Mat Rasol Awang

    2007-01-01

    This paper discusses the roadmap for the Biofertilizer Development Project conducted at the Malaysian Nuclear Agency (Nuclear Malaysia). The project started in 2003 and scheduled to end in 2008. Biofertilizer refers to living microorganisms or materials that contain living microorganisms that contributes to improvement in plant nutrition, soil fertility and crop productivity. The main components of the project are (a) biofertilizer substrate or carrier development, (b) biofertilizer inoculum development based on local indigenous microorganisms (c) biofertilizer product formulation and innovation, and (d) evaluation of efficiency of biofertilizer products on crops under different cropping systems, including under modern agriculture under soilless system. The above components may involve nuclear technology, viz, use of ionising radiation and the use of isotopic tracers. The paper also discusses local and international linkages, including with Forum for Nuclear Cooperation in Asia (FNCA) and the industry, and aspects of commercialisation and technology transfer. (Author)

  10. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  11. Development of an identification system for potential ICES projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    An earlier study by Real Estate Research Corporation (RERC) provides an overview of methods for developing marketing strategies for ICES. One aim of that document was to establish an information system for identifying areas, subareas, sites, or projects with substantial growth or development activity as potential candidates for the application of ICES. This report summarizes RERC's effort to implement and test such an information system. The specific objectives of this report are: (1) identify and collect basic information on 150 large-scale construction projects; (2) identify areas of the country, i.e., states and SMSAs that evidence general growth characteristics that would support ICES applications; (3) identify regions, states, and SMSAs that display higher-than-average energy costs; and (4) identify regions, states, and SMSAs that have experienced significant activity in identified land-use sectors and subsectors. Recent development activities in the commercial, industrial, residential, institutional, and transportation sectors are detailed. Mixed-use projects are included within the commercial sector. An annotated bibliography is included. (MCW)

  12. Social Licence to Operate through a gender lens : The challenges of including women’s interests in development assistance projects

    NARCIS (Netherlands)

    Jijelava, David; Vanclay, Frank

    2014-01-01

    The paper analyses the concept of social licence to operate from a gender perspective. We examine the challenges associated with obtaining a gender-aware social licence for development assistance organizations working in conservative, traditional rural societies. We argue that during project

  13. Project-Based Management Development: "The Volvo Story."

    Science.gov (United States)

    Branch, John; Smith, Bryan

    1992-01-01

    A modular group project-based approach to management development was implemented by Volvo Concessionaires (United Kingdom) in partnership with training consultants. Ingredients of its success included top-level commitment, investment in diagnosis and tailoring, and use of company-specific case studies. (SK)

  14. Development of Direct-Use Projects: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lund, J.

    2011-01-01

    A geothermal direct-use project utilizes a natural resource, a flow of geothermal fluid at elevated temperatures, which is capable of providing heat and/or cooling to buildings, greenhouses, aquaculture ponds, and industrial processes. Geothermal utilization requires matching the varied needs of the user and characteristics of the resource in order to development a successful project. Each application is unique; guidelines are provided for the logical steps required to implement a project. Recommended temperature and flows are suggested for spas and pools, space and district heating, greenhouse and aquaculture pond heating, and industrial applications. Guidelines are provided for selecting the necessary equipment for successfully implementing a direct-use project, including downhole pumps, piping, heat exchangers, and heat convectors. Additionally, the relationship between temperature, flow rate, and the use of heat exchangers to provide heat to a space with hot water or hot air is provided for a number of applications, with suggested 'rules of thumb'.

  15. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  16. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  17. CDM sustainable development impacts developed for the UNEP project 'CD4CDM'

    Energy Technology Data Exchange (ETDEWEB)

    Olhoff, Anne; Markandya, Anil; Halsnaes, Kirsten; Taylor, Tim

    2004-07-01

    The Clean Development Mechanism (CDM), an innovative cooperative mechanism under the Kyoto Protocol, is designed with the dual aim of assisting developing countries in achieving sustainable development (SD) and of assisting industrialised countries in achieving compliance with their greenhouse gas (GHG) emission reduction commitments. The SD dimension is not merely a requirement of the CDM; it should be seen as a main driver for developing country interest in participating in CDM projects. This is so, since apart from GHG emission reductions CDM projects will have a number of impacts in the host countries, including impacts on economic and social development and on the local environment. Furthermore, the selecting of the SD criteria and the assessment of the SD impacts are sovereign matters of the host countries in the current operationalisation of the Kyoto Protocol. National authorities can thus use the SD dimension to evaluate key linkages between national development goals and CDM projects, with the aim of selecting and designing CDM projects so that they create and maximise synergies with local development goals. (au)

  18. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  19. A Reformed CDM - including new mechanisms for sustainable development

    Energy Technology Data Exchange (ETDEWEB)

    Holm Olsen, K; Fenhann, J

    2009-07-01

    The annual CD4CDM Perspectives Series features a topic of pivotal importance to the global carbon market. The series seeks to communicate the diverse insights and visions of leading actors in the carbon market to better inform the decisions of professionals and policymakers in developing countries. The second theme of the series focuses on how the CDM can be reformed in a post-2012 climate regime, including new mechanism for sustainable development. Seventeen contributors from the private sector, Designated National Authorities, the Executive Board, research, and development agencies present their perspective on meeting challenges such as the unequal regional distribution of CDM projects, concerns about environmental integrity and technology transfer, complex governance procedures, and questions about the CDM's contribution to sustainable development. The new ideas and solutions to these challenges proposed by the authors in this edition of Perspectives have been solicited to help professionals and policy makers make the best decisions in the lead-up to COP 15 in Copenhagen and beyond. (au)

  20. A Reformed CDM - including new mechanisms for sustainable development

    Energy Technology Data Exchange (ETDEWEB)

    Holm Olsen, K.; Fenhann, J.

    2009-07-01

    The annual CD4CDM Perspectives Series features a topic of pivotal importance to the global carbon market. The series seeks to communicate the diverse insights and visions of leading actors in the carbon market to better inform the decisions of professionals and policymakers in developing countries. The second theme of the series focuses on how the CDM can be reformed in a post-2012 climate regime, including new mechanism for sustainable development. Seventeen contributors from the private sector, Designated National Authorities, the Executive Board, research, and development agencies present their perspective on meeting challenges such as the unequal regional distribution of CDM projects, concerns about environmental integrity and technology transfer, complex governance procedures, and questions about the CDM's contribution to sustainable development. The new ideas and solutions to these challenges proposed by the authors in this edition of Perspectives have been solicited to help professionals and policy makers make the best decisions in the lead-up to COP 15 in Copenhagen and beyond. (au)

  1. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  2. NASA Game Changing Development Program Manufacturing Innovation Project

    Science.gov (United States)

    Tolbert, Carol; Vickers, John

    2011-01-01

    This presentation examines the new NASA Manufacturing Innovation Project. The project is a part of the Game Changing Development Program which is one element of the Space Technology Programs Managed by Office of the Chief Technologist. The project includes innovative technologies in model-based manufacturing, digital additive manufacturing, and other next generation manufacturing tools. The project is also coupled with the larger federal initiatives in this area including the National Digital Engineering and Manufacturing Initiative and the Advanced Manufacturing Partnership. In addition to NASA, other interagency partners include the Department of Defense, Department of Commerce, NIST, Department of Energy, and the National Science Foundation. The development of game-changing manufacturing technologies are critical for NASA s mission of exploration, strengthening America s manufacturing competitiveness, and are highly related to current challenges in defense manufacturing activities. There is strong consensus across industry, academia, and government that the future competitiveness of U.S. industry will be determined, in large part, by a technologically advanced manufacturing sector. This presentation highlights the prospectus of next generation manufacturing technologies to the challenges faced NASA and by the Department of Defense. The project focuses on maturing innovative/high payoff model-based manufacturing technologies that may lead to entirely new approaches for a broad array of future NASA missions and solutions to significant national needs. Digital manufacturing and computer-integrated manufacturing "virtually" guarantee advantages in quality, speed, and cost and offer many long-term benefits across the entire product lifecycle. This paper addresses key enablers and emerging strategies in areas such as: Current government initiatives, Model-based manufacturing, and Additive manufacturing.

  3. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  4. 23 CFR 660.112 - Project development.

    Science.gov (United States)

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  5. Developing financeable projects in Central Europe

    Energy Technology Data Exchange (ETDEWEB)

    Chelberg, R.; Prerad, V. [POWER International, Josefov (Czechoslovakia)

    1995-12-01

    POWER`s engineering and development experience in the Czech Republic creating financeable projects within the power generation industry will be presented. POWER has been involved in the Czech Republic`s privatization process, environmental legislation as well as formation of the regulatory environment. Strategic methods for accomplishing the development of financeable projects often include ownership and financial restructuring of the projects. This is done by utilizing internal cash flows, external debt and equity placement (provided by international financial institutions) by restructuring the facility`s contractual relationships and operations (providing as least cost solution to engineering) and possibly using existing governmental guarantees. In order to make any recommendations on how to come into compliance with the country`s environmental legislation, it is necessary to begin with an analysis of the existing facility. This involves preparation of technical and economic feasibility study, evaluation of technology and preliminary engineering solutions. It further involves restructuring of power sales agreements, heat sales agreements, and fuel supply agreements. The goal is to provide suitable security for the equity and debt financing participants by mitigating risk and creating a single purpose business unit with predictable life and economics.

  6. Automotive Stirling Engine Development Project

    Science.gov (United States)

    Ernst, William D.; Shaltens, Richard K.

    1997-01-01

    The development and verification of automotive Stirling engine (ASE) component and system technology is described as it evolved through two experimental engine designs: the Mod 1 and the Mod 2. Engine operation and performance and endurance test results for the Mod 1 are summarized. Mod 2 engine and component development progress is traced from the original design through hardware development, laboratory test, and vehicle installation. More than 21,000 hr of testing were accomplished, including 4800 hr with vehicles that were driven more dm 59,000 miles. Mod 2 engine dynamometer tests demonstrated that the engine system configuration had accomplished its performance goals for power (60 kW) and efficiency (38.5%) to within a few percent. Tests with the Mod 2 engine installed in a delivery van demonstrated combined metro-highway fuel economy improvements consistent with engine performance goals and the potential for low emission levels. A modified version of the Mod 2 has been identified as a manufacturable design for an ASE. As part of the ASE project, the Industry Test and Evaluation Program (ITEP), NASA Technology Utilization (TU) project, and the industry-funded Stirling Natural Gas Engine program were undertaken to transfer ASE technology to end users. The results of these technology transfer efforts are also summarized.

  7. Gamification in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Platonova Valērija

    2017-12-01

    Full Text Available Gamification is one of the many ways to motivate employees and introduce more fun in daily activities. The aim of the paper is to analyse the impact of gamification method on the software development projects. The paper contains results of a literature review about application areas of gamification, methods, positive and negative effects on projects. The paper also presents an overview of the gamification tools used in software development projects and attempts to answer the question about benefits of gamification usage: whether gamification in the project leads to the desired results and increases the employee productivity and motivation.

  8. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  9. How to Optimally Interdict a Belligerent Project to Develop a Nuclear Weapon

    National Research Council Canada - National Science Library

    Skroch, Eric

    2004-01-01

    ... a large-scale project management model that includes alternate development paths to achieve certain key technical milestones We show how such a project can be optimally accelerated by expediting critical...

  10. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  11. All projects related to | Page 612 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    All projects related to ... Competitiveness on the part of Egyptian enterprises is regarded as one of the key factors in the country's economic development. ... Modernizing Agrifood Markets : Including Small Producers in Dynamic Markets.

  12. The Thai-Canadian nuclear human resources development linkage project

    International Nuclear Information System (INIS)

    Sumitra, Tatchai; Chankow, Nares; Bradley, K.; Bereznai, G.

    1998-01-01

    The Thai-Canadian Nuclear Human Resources Development Linkage Project (the P roject ) was initiated in 1994 in order to develop the engineering and scientific expertise needed for Thailand to decide whether and how the country can best benefit from the establishment of a nuclear power program. The Project was designed to upgrade current academics and people in industry, and to develop an adequate supply of new technical personnel for academic, industry, utility, regulatory and other government institutions. The key Project objectives included the establishment of a Chair in Nuclear Engineering at Chulalongkorn University, the upgrading of the current Masters level curriculum, the establishment of undergraduate and doctorate level curricula, development and delivery of an industrial training program for people in industry and government, exchanges of Thai and Canadian academics and industry experts to establish common research programs and teaching interests, and a public education program that was to test in Thailand some of the techniques that have been successfully used in Canada. (author)

  13. Influence of 4-H Horse Project Involvement on Development of Life Skills

    Science.gov (United States)

    Anderson, K. P.; Karr-Lilienthal, L.

    2011-01-01

    Four-H horse project members who competed in non-riding horse contests were surveyed to evaluate the influence of their horse project participation on life-skill development. Contests in which youth competed included Horse Bowl, Demonstrations, Public Speaking, and Art. Youth indicated a positive influence on both life-skill development and horse…

  14. All projects related to | Page 111 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Tanzania, along with most African countries, has been struggling to address persistent nutritional challenges, including vitamin A and iron deficiencies. Topic: AFRICA, CANADA, PILOT PROJECTS, MEDIUM ENTERPRISES, SMALL ENTERPRISES, SUSTAINABLE DEVELOPMENT, TANZANIA, NUTRITION. Region: ...

  15. Developing an action-based health and safety training project in southern China.

    Science.gov (United States)

    Szudy, Betty; O'Rourke, Dara; Brown, Garrett D

    2003-01-01

    A project brought together international footwear manufacturers, labor rights groups, local contract factories, and occupational health professionals to strengthen factory health and safety programs in southern China. Steps involved in the two-year project, including needs assessment, interviews and focus groups with workers and supervisors; design and development of a participatory workshop; development of plant-wide health and safety committees in three footwear factories; and evaluation project impact, are discussed. The project significantly increased occupational safety and health knowledge, and hazards in the factories were identified and corrected. Successes and challenges faced by three functioning worker-management health and safety committees are discussed. Key elements to create effective programs with meaningful participation by workers include: 1) developing clear guidelines that enable multi-stakeholder groups to collaborate; 2) obtaining top-level management support; 3) building workers' knowledge and capacity to fully participate; 4) involving local labor rights groups and occupational professionals in support and technical assistance; and 5) connecting project goals to larger issues within a country and the global economy.

  16. Including Energy Efficiency and Renewable Energy Policies in Electricity Demand Projections

    Science.gov (United States)

    Find more information on how state and local air agencies can identify on-the-books EE/RE policies, develop a methodology for projecting a jurisdiction's energy demand, and estimate the change in power sector emissions.

  17. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    Energy Technology Data Exchange (ETDEWEB)

    Hirsch, Brian [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Burman, Kari [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Davidson, Carolyn [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elchinger, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hardison, R. [Winrock International, Little Rock, AR (United States); Karsiwulan, D. [Winrock International, Little Rock, AR (United States); Castermans, B. [Winrock International, Little Rock, AR (United States)

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  18. The CAREM project: Present status and development activities

    International Nuclear Information System (INIS)

    Boado Magan, H.J.; Ordonez, J.P.; Hey, A.

    1997-01-01

    The CAREM Project is a low power NPP of 25 Mwe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type and several passive safety systems are included. The owner of the Project is Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, is the main contractor. The present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. A short description of the Experimental Facilities, listed below, already in operation and under construction are also included: CAPCN High Pressure Loop. Natural convection loop to verify dynamic response and critical heat flux; RA-8. Critical Facility, designed and constructed for the CAREM Project (that may be used as a general uses facility); RPV lnternals. The whole assembly of absorbent rods, connecting rods and the rode guides are being constructed in a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameters definitions. Control Drive Mechanisms. A series of verification and tests are being carried out on these within RPV Hydraulically driven mechanisms. Other development activities are mentioned in relation with the thermalhydraulics, Steam Generators and Control. (author)

  19. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  20. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  1. Energy Efficient Community Development in California: Chula Vista Research Project

    Energy Technology Data Exchange (ETDEWEB)

    Gas Technology Institute

    2009-03-31

    In 2007, the U.S. Department of Energy joined the California Energy Commission in funding a project to begin to examine the technical, economic and institutional (policy and regulatory) aspects of energy-efficient community development. That research project was known as the Chula Vista Research Project for the host California community that co-sponsored the initiative. The researches proved that the strategic integration of the selected and economically viable buildings energy efficiency (EE) measures, photovoltaics (PV), distributed generation (DG), and district cooling can produce significant reductions in aggregate energy consumption, peak demand and emissions, compared to the developer/builder's proposed baseline approach. However, the central power plant emission reductions achieved through use of the EE-DG option would increase local air emissions. The electric and natural gas utility infrastructure impacts associated with the use of the EE and EE-PV options were deemed relatively insignificant while use of the EE-DG option would result in a significant reduction of necessary electric distribution facilities to serve a large-scale development project. The results of the Chula Vista project are detailed in three separate documents: (1) Energy-Efficient Community Development in California; Chula Vista Research Project report contains a detailed description of the research effort and findings. This includes the methodologies, and tools used and the analysis of the efficiency, economic and emissions impacts of alternative energy technology and community design options for two development sites. Research topics covered included: (a) Energy supply, demand, and control technologies and related strategies for structures; (b) Application of locally available renewable energy resources including solar thermal and PV technology and on-site power generation with heat recovery; (c) Integration of local energy resources into district energy systems and existing

  2. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  3. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  4. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  5. The essential value of projects in faculty development.

    Science.gov (United States)

    Gusic, Maryellen E; Milner, Robert J; Tisdell, Elizabeth J; Taylor, Edward W; Quillen, David A; Thorndyke, Luanne E

    2010-09-01

    Projects--planned activities with specific goals and outcomes--have been used in faculty development programs to enhance participant learning and development. Projects have been employed most extensively in programs designed to develop faculty as educators. The authors review the literature and report the results of their 2008 study of the impact of projects within the Pennsylvania State University College of Medicine Junior Faculty Development Program, a comprehensive faculty development program. Using a mixed-methods approach, the products of project work, the academic productivity of program graduates, and the impact of projects on career development were analyzed. Faculty who achieved the most progress on their projects reported the highest number of academic products related to their project and the highest number of overall academic achievements. Faculty perceived that their project had three major effects on their professional development: production of a tangible outcome, development of a career focus, and development of relationships with mentors and peers. On the basis of these findings and a review of the literature, the authors conclude that projects are an essential element of a faculty development program. Projects provide a foundation for future academic success by enabling junior faculty to develop and hone knowledge and skills, identify a career focus and gain recognition within their community, generate scholarship, allocate time to academic work, and establish supportive relationships and collaborative networks. A list of best practices to successfully incorporate projects within faculty development programs is provided.

  6. Development of project financing in Russia

    Directory of Open Access Journals (Sweden)

    Nikonova Irina Aleksandrovna

    2012-07-01

    Full Text Available The implementation of effective investment projects is essential to the modernization of the Russian economy and its transition to a high-tech way of development. The most complex and risky form of financing projects is project financing (Project Finance.

  7. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  8. Development of the digital design environment ProjectWise(TM) - phase 1.

    Science.gov (United States)

    2017-04-28

    The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...

  9. On e-Government Project Development in Balmeda

    Science.gov (United States)

    Anagnostou, Miltiades E.; Lambrou, Maria A.

    An e-government project management and development scenario in a fictional country is described. Emphasis is given on how local culture undermines project quality. A detailed fictional project development scenario is presented. The interplay between different players, i.e. project developers, reviewers, and public services, is illustrated. While the rules of technology are the same everywhere, local adaptation due to socio-economic factors can bend them to the degree of making them ineffective.

  10. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  11. DEVELOPMENT OF A METADATA MANAGEMENT SYSTEM FOR AN INTERDISCIPLINARY RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    C. Curdt

    2012-07-01

    Full Text Available In every interdisciplinary, long-term research project it is essential to manage and archive all heterogeneous research data, produced by the project participants during the project funding. This has to include sustainable storage, description with metadata, easy and secure provision, back up, and visualisation of all data. To ensure the accurate description of all project data with corresponding metadata, the design and implementation of a metadata management system is a significant duty. Thus, the sustainable use and search of all research results during and after the end of the project is particularly dependent on the implementation of a metadata management system. Therefore, this paper will describe the practical experiences gained during the development of a scientific research data management system (called the TR32DB including the corresponding metadata management system for the multidisciplinary research project Transregional Collaborative Research Centre 32 (CRC/TR32 'Patterns in Soil-Vegetation-Atmosphere Systems'. The entire system was developed according to the requirements of the funding agency, the user and project requirements, as well as according to recent standards and principles. The TR32DB is basically a combination of data storage, database, and web-interface. The metadata management system was designed, realized, and implemented to describe and access all project data via accurate metadata. Since the quantity and sort of descriptive metadata depends on the kind of data, a user-friendly multi-level approach was chosen to cover these requirements. Thus, the self-developed CRC/TR32 metadata framework is designed. It is a combination of general, CRC/TR32 specific, as well as data type specific properties.

  12. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Directory of Open Access Journals (Sweden)

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  13. Students' Perceptions of Life Skill Development in Project-Based Learning Schools

    Science.gov (United States)

    Meyer, Kimberly; Wurdinger, Scott

    2016-01-01

    This research aimed to examine students' perceptions of their life skills while attending project-based learning (PBL) schools. The study focused on three questions including: (1) What are students' perceptions of their development of life skills in project-based learning schools?; (2) In what ways, if any, do students perceive an increase in…

  14. Final project report: High energy rotor development, test and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  15. IAEA Assistance in the development of new research reactor projects

    Energy Technology Data Exchange (ETDEWEB)

    Borio di Tigliole, Andrea; Bradley, Ed; Zhukova, Anastasia; Adelfang, Pablo [International Atomic Energy Agency, Research Reactor Section, Vienna (Austria); Shokr, Amgad [International Atomic Energy Agency, Research Reactor Safety Section, Vienna (Austria); Ridikas, Danas [International Atomic Energy Agency, Physics Section, Vienna (Austria)

    2015-08-15

    A research reactor (RR) project is a major undertaking that requires careful preparation, planning, implementation and investment in time, money, and human resources. In recent years, the interest of IAEA Member States in developing RR programmes has grown significantly, and currently, several Member States are in different stages of new RR projects. The majority of these countries are building their first RR as a key national facility for the development of their nuclear science and technology programmes, including nuclear power. In order to support Member States in such efforts, the IAEA in 2012 published the Nuclear Energy Series Report No. NP-T-5.1 on Specific Considerations and Milestones for a Research Reactor Project. To provide further support, the IAEA also published a document to assist Member States in the preparation of the bid invitation specification for the purchase of a RR. The IAEA will also continue to provide assistance for human resources development of the Member States establishing their first RR, and to facilitate sharing experience and knowledge among Member States through its programmatic activities including expert mission services, technical meetings, training courses and workshops addressing relevant technical and safety topics. This paper presents the IAEA assistance and services provided to the Member States considering new RRs, with particular emphasis on those establishing their first RR, including elaboration on the services mentioned above.

  16. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  17. Programmes and projects for high-temperature reactor development

    International Nuclear Information System (INIS)

    Bogusch, Edgar; Hittner, Dominique

    2009-01-01

    An increasing attention has to be recognised worldwide on the development of High-Temperature Reactors (HTR) which has started in Germany and other countries in the 1970ies. While pebble bed reactors with spherical fuel elements have been developed and constructed in Germany, countries such as France, the US and Russia investigated HTR concepts with prismatic block-type fuel elements. The concept of a modular HTR formerly developed by Areva NP was an essential basis for the HTR-10 in China. A pebble bed HTR for electricity production is developed in South Africa. The construction is planned after the completion of the licensing procedure. Also the US is planning an HTR under the NGNP (Next Generation Nuclear Plant) Project. Due to the high temperature level of the helium coolant, the HTR can be used not only for electricity production but also for supply of process heat. Including its inherent safety features the HTR is an attractive candidate for heat supply to various types of plants e.g. for hydrogen production or coal liquefactions. The conceptual design of an HTR with prismatic fuel elements for the cogeneration of electricity and process heat has been developed by Areva NP. On the European scale the HTR development is promoted by the RAPHAEL (ReActor for Process heat, Hydrogen And ELectricity generation) project. RAPHAEL is an Integrated Project of the Euratom 6th Framework Programme for the development of technologies towards a Very High-Temperature Reactor (VHTR) for the production of electricity and heat. It is financed jointly by the European Commission and the partners of the HTR Technology Network (HTR-TN) and coordinated by Areva NP. The RAPHAEL project not only promotes HTR development but also the cooperation with other European projects such as the material programme EXTREMAT. Furthermore HTR technology is investigated in the frame of Generation IV International Forum (GIF). The development of a VHTR with helium temperatures above 900 C for the

  18. Baseline methodologies for clean development mechanism projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.K. (ed.); Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-15

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  19. Baseline methodologies for clean development mechanism projects

    International Nuclear Information System (INIS)

    Lee, M.K.; Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-01

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  20. Manufacturing of cells and stacks for SOFC development, test and demonstration projects and SOFC hotbox design development

    Energy Technology Data Exchange (ETDEWEB)

    2008-09-15

    The purpose of this project is to support the continued SOFC development through manufacturing process optimization and manufacturing of SOFC cells and stacks. These cells and stacks will serve as a necessary base for the development activities and for the establishment of a number of test and demonstration activities. The manufacture will also help provide operating experience and reduce manufacturing cost. Another main focus of the manufacturing is to assure technical improvements and reliability. It is imperative to the eventual success of the technology that test and demonstration is carried out in the pre-market conditions that will exist for the next years in the three market segments targeted by TOFC (Distributed generation, micro CHP and APU incl. marine APU). Finally, the project also includes development activities focusing on the stack-system interface (hotbox design development) and on dealing with transients and start up and shut down times, which is of particular importance for APU and micro CHP applications. Three topics are addressed:1) Cell manufacture, including production development, capacity lift and manuf. of cells for test and demonstration; 2) Stack manufacture and test, including a test facility, stack manuf. and test of stacks in a system at HCV; 3) Hotbox design development, including design, prototype construction and testing. The progress of this project is documented. Major achievements are successful manufacture of adequate amounts of cells and stacks according to the application. Furthermore significant over-performance in design, construction and test of a methanol based hotbox prototype as well as publication of this. (au)

  1. Estimating software development project size, using probabilistic ...

    African Journals Online (AJOL)

    Estimating software development project size, using probabilistic techniques. ... of managing the size of software development projects by Purchasers (Clients) and Vendors (Development ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  2. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    Science.gov (United States)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  3. The NEED (National Energy Education Development) Project

    Science.gov (United States)

    Hogan, D.; Spruill, M.

    2012-04-01

    The NEED (National Energy Education Development) Project is a non-profit organization which provides a wide range of K-12 curriculum on energy education topics. The curriculum is specific for primary, elementary, intermediate and secondary levels with age appropriate activities and reading levels. The NEED Project covers a wide range of topics from wind energy, nuclear energy, solar energy, hydropower, hydrogen, fossil fuels, energy conservation, energy efficiency and much more. One of the major strengths of this organization is its Teacher Advisory Board. The curriculum is routinely revised and updated by master classroom teachers who use the lessons and serve on the advisory board. This ensures it is of the highest quality and a useful resource. The NEED Project through a variety of sponsors including businesses, utility companies and government agencies conducts hundreds of teacher professional development workshops each year throughout the United States and have even done some workshops internationally. These workshops are run by trained NEED facilitators. At the workshops, teachers gain background understanding of the energy topics and have time to complete the hands on activities which make up the curriculum. The teachers are then sent a kit of equipment after successfully completing the workshop. This allows them to teach the curriculum and have their students perform the hands on labs and activities in the classroom. The NEED Project is the largest provider of energy education related curriculum in the United States. Their efforts are educating teachers about energy topics and in turn educating students in the hope of developing citizens who are energy literate. Many of the hands on activities used to teach about various energy sources will be described and demonstrated.

  4. Impact of Personal Growth Projects on Leadership Identity Development

    Science.gov (United States)

    Odom, Summer F.; Boyd, Barry L.; Williams, Jennifer

    2012-01-01

    Within personal leadership education courses, leadership educators should include experiences which help students develop themselves as leaders. In this article, the authors discuss results from a qualitative research study involving the analysis of Personal Growth Project (PGP) assignments in a personal leadership education collegiate course. The…

  5. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    International Nuclear Information System (INIS)

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology

  6. Smart Grid Development: Multinational Demo Project Analysis

    OpenAIRE

    Oleinikova I.; Mutule A.; Obushevs A.; Antoskovs N.

    2016-01-01

    This paper analyses demand side management (DSM) projects and stakeholders’ experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR) and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO) and transmission system operator (TSO). This pape...

  7. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  8. Transportation risk management : international practices for program development and project delivery.

    Science.gov (United States)

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  9. 75 FR 22674 - Moynihan Station Development Project

    Science.gov (United States)

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Moynihan Station Development Project... availability of and public comment period for the Moynihan Station Development Project Environmental Assessment... 22675

  10. Sustainable Relations in International Development Cooperation Projects: The Role of Organizational Climate

    Directory of Open Access Journals (Sweden)

    Cosimo Rota

    2011-10-01

    Full Text Available  The importance of the human side of project management to assess the success of international development project has not been fully considered yet. An analysis of the literature on the project success definition, focused on the success criteria and success factors, was carried out. The organization’s effectiveness, in terms of Relations Sustainability, emerged as a criteria integrating the "time, cost, performance" approach to define a project success. Based on previous research contributions on the factors influencing the organization’s effectiveness, the paper expands the analysis of the influence of Organizational Climate on the Relation Sustainability between project manager and project team involved in international cooperation for development. The statistical methods used include confirmatory factors analysis and structural equation modeling. The results carry implications for project management identifying five dimensions of Organizational Climate (trust, innovation, social cohesion, communication and job challenge influencing Relations Sustainability. This finding suggests that Organizational Climate contributes to project success by creating trust, stimulating commitment and generating satisfaction to overcome conflicts between project manager and project team.

  11. Hierarchy Software Development Framework (h-dp-fwk) project

    International Nuclear Information System (INIS)

    Zaytsev, A

    2010-01-01

    Hierarchy Software Development Framework provides a lightweight tool for building portable modular applications for performing automated data analysis tasks in a batch mode. The history of design and development activities devoted to the project has begun in March 2005 and from the very beginning it was targeting the case of building experimental data processing applications for the CMD-3 experiment which is being commissioned at Budker Institute of Nuclear Physics (BINP, Novosibirsk, Russia). Its design addresses the generic case of modular data processing application operating within the well defined distributed computing environment. The main features of the framework are modularity, built-in message and data exchange mechanisms, XInclude and XML schema enabled XML configuration management tools, dedicated log management tools, internal debugging tools, both dynamic and static module chains support, internal DSO version and consistency checking, well defined API for developing specialized frameworks. It is supported on Scientific Linux 4 and 5 and planned to be ported to other platforms as well. The project is provided with the comprehensive set of technical documentation and users' guides. The licensing schema for the source code, binaries and documentation implies that the product is free for non-commercial use. Although the development phase is not over and many features are to be implemented yet the project is considered ready for public use and creating applications in various fields including development of events reconstruction software for small and moderate scale HEP experiments.

  12. Hierarchy Software Development Framework (h-dp-fwk) project

    Energy Technology Data Exchange (ETDEWEB)

    Zaytsev, A, E-mail: Alexander.S.Zaytsev@gmail.co [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)

    2010-04-01

    Hierarchy Software Development Framework provides a lightweight tool for building portable modular applications for performing automated data analysis tasks in a batch mode. The history of design and development activities devoted to the project has begun in March 2005 and from the very beginning it was targeting the case of building experimental data processing applications for the CMD-3 experiment which is being commissioned at Budker Institute of Nuclear Physics (BINP, Novosibirsk, Russia). Its design addresses the generic case of modular data processing application operating within the well defined distributed computing environment. The main features of the framework are modularity, built-in message and data exchange mechanisms, XInclude and XML schema enabled XML configuration management tools, dedicated log management tools, internal debugging tools, both dynamic and static module chains support, internal DSO version and consistency checking, well defined API for developing specialized frameworks. It is supported on Scientific Linux 4 and 5 and planned to be ported to other platforms as well. The project is provided with the comprehensive set of technical documentation and users' guides. The licensing schema for the source code, binaries and documentation implies that the product is free for non-commercial use. Although the development phase is not over and many features are to be implemented yet the project is considered ready for public use and creating applications in various fields including development of events reconstruction software for small and moderate scale HEP experiments.

  13. Methodology for economic evaluation of software development projects

    International Nuclear Information System (INIS)

    Witte, D.M.

    1990-01-01

    Many oil and gas exploration and production companies develop computer software in-house or with contract programmers to support their exploration activities. Software development projects compete for funding with exploration and development projects, though most companies lack valid comparison measures for the two types of projects. This paper presents a methodology of pro form a cash flow analysis for software development proposals intended for internal use. This methodology, based on estimates of development and support costs, exploration benefits, and probability of successful development and implementation, can be used to compare proposed software development projects directly with competing exploration proposals

  14. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  15. Proven approaches to organise a large decommissioning project, including the management of local stakeholder interests

    International Nuclear Information System (INIS)

    Rodriguez, A.

    2005-01-01

    Full text: Spanish experience holds a relatively important position in the field of the decommissioning of nuclear and radioactive facilities. Decommissioning projects of uranium concentrate mill facilities are near completion; some old uranium mine sites have already been restored; several projects for the dismantling of various small research nuclear reactors and a few pilot plants are at various phases of the dismantling process, with some already completed. The most notable Spanish project in this field is undoubtedly the decommissioning of the Vandellos 1 nuclear power plant that is currently ready to enter a safe enclosure, or dormancy, period. The management of radioactive wastes in Spain is undertaken by 'Empresa Nacional de Residuos Radioactivos, S.A.' (ENRESA), the Spanish national radioactive waste company, constituted in 1984. ENRESA operates as a management company, whose role is to develop radioactive waste management programmes in accordance with the policy and strategy approved by the Spanish Government. Its responsibilities include the decommissioning and dismantling of nuclear installations. Decommissioning and dismantling nuclear installations is an increasingly important topic for governments, regulators, industries and civil society. There are many aspects that have to be carefully considered, planned and organised in many cases well in advance of when they really need to be implemented. The goal of this paper is describe proven approaches relevant to organizing and managing large decommissioning projects, in particular in the case of Vandellos-1 NPP decommissioning. (author)

  16. Oxide fuel fabrication technology development of the FaCT project (1). Overall review of fuel technology development of the FaCT project

    International Nuclear Information System (INIS)

    Abe, Tomoyuki; Namekawa, Takashi; Tanaka, Kenya

    2011-01-01

    The FaCT project is in progress in Japan for the commercialization of fast reactor cycle system. The development goal of the fuel in the FaCT project is a low-decontaminated TRU homo-recycling in a closed cycle and extension in average discharge burn-up to 150 GWd/t. Research and development on innovative technologies concerning the short process, remote maintenance and cooling system of automatic fuel production equipments, long life cladding material and control of oxygen potential have been conducted in phase I of the FaCT project. As the result of various test including 600 g batch MOX tests, it is concluded that the short process is available to fuel pellet fabrication of the FaCT project. Although cold mock-up tests on test model of some typical process equipments suggest possibilities of remote maintenance of automatic fuel fabrication equipment, it is concluded that it still needs further efforts to judge the operability of the completely remote fabrication for low-decontaminated TRU fuel. A cold mock-up test on fuel pin assembling equipment show that influence of decay heat of MA can be managed by cooling system. Irradiation tests in BOR-60 indicate that 9Cr-ODS possess the satisfactory in-reactor performance as the long life cladding material if homogeneity of alloy element is adequately controlled. Modification of cladding tube fabrication process to ensure homogeneity and further development of measures to control oxygen potential inside the fuel pin are necessary to reach the burn-up target of the FaCT project. (author)

  17. Recent developments of the projected shell model based on many-body techniques

    Directory of Open Access Journals (Sweden)

    Sun Yang

    2015-01-01

    Full Text Available Recent developments of the projected shell model (PSM are summarized. Firstly, by using the Pfaffian algorithm, the multi-quasiparticle configuration space is expanded to include 6-quasiparticle states. The yrast band of 166Hf at very high spins is studied as an example, where the observed third back-bending in the moment of inertia is well reproduced and explained. Secondly, an angular-momentum projected generate coordinate method is developed based on PSM. The evolution of the low-lying states, including the second 0+ state, of the soft Gd, Dy, and Er isotopes to the well-deformed ones is calculated, and compared with experimental data.

  18. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  19. Project evaluation for energy supply in rural areas of developing countries

    DEFF Research Database (Denmark)

    Vidal, Rene Victor Valqui; Christensen, J. M.

    1990-01-01

    This paper reports the methodological experiences of the project: Energy Supply Technologies in Developing Countries, carried out in collaboration with the Department of Energy, Zambia. Existing methods for project evaluation, based on cost-benefit analysis, will be briefly presented, particularly...... as regards their inadequacy for assessing energy projects in rural areas.An alternative practical and PC-based approach will be presented in which emphasis is placed on the problem formulation phase, including the socio-economic, cultural and political aspects of the problem. This approach has been prepared...

  20. Research and development project plans for FY 1995; 1995 nendo kenkyu kaihatsu jigyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The present research and development project plans for FY 1995 administrated by NEDO consist of research and development of new energy, and research and development of industrial technology. Are illustrated further enhancement of new energy introduction promotion measures, new stage of international projects, promotion of new energy and new energy technology development, further enhancement of industrial and scientific technology research and development, integrated measures against global and urban environment problems, and budget of NEDO projects in FY 1995. The research and development of new energy includes coal conversion technology, solar energy technology, geothermal energy technology, energy conversion and storage technology, hydrogen, alcohol and biomass energy technology, geothermal energy resources, coal resources development, new energy promotion department activities, NEDO information center activities, and so on. On the other hand, the research and development of industrial technology includes research and development of industrial technology, and global environment technology. The research and development of industrial technology consists of superconductivity, new materials, biotechnology, electronics, information and communications, machinery and aerospace, natural resources, humanity, life and society, and various leading researches.

  1. Landfill Gas Energy Project Development Handbook

    Science.gov (United States)

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  2. 25 CFR 170.915 - May tribal employment taxes or fees be included in an IRR project budget?

    Science.gov (United States)

    2010-04-01

    ... Preference § 170.915 May tribal employment taxes or fees be included in an IRR project budget? Yes. The cost of tribal employment taxes or fees may be included in the budget for an IRR program or project... 25 Indians 1 2010-04-01 2010-04-01 false May tribal employment taxes or fees be included in an IRR...

  3. Guidebook on the development of projects for uranium mining and ore processing

    International Nuclear Information System (INIS)

    1991-04-01

    Bringing a uranium operation into production involves a sequence of interrelated steps. These are outlined in the simplified diagram of Fig. 1. The challenge is to determine how the various steps of the development sequence should function and whether the costs are sufficiently low to return a positive benefit to the owner. This Guidebook has been prepared to aid in the planning, development and implementation of feasible uranium projects. It is one in a series of publications by the IAEA. This guidebook is essentially the executive summary of the other publications. It is an overview of the systematic approach to project development. It might be viewed as the ''road map'' of a project. A list of other publications in this series is provided in the Bibliography. Each chapter of the Guidebook addresses a critical aspect of project development. Chapters follow a general sequence, but none should be considered in isolation. Each Chapter presents an overview of the requirements for reaching decisions necessary to advance a project. References are provided to more definitive information and to documents which will be required by technical personnel on a project. Such detailed publications include IAEA books such as ''An Instruction Manual on Methods for Estimation of Uranium Ore Reserves'', and the ''Significance of Mineralogy in the Development of Flow Sheets for Processing Uranium Ores''. This Guidebook does not detail how to do project development but rather what must be done to insure that all critical elements of a project are considered. Refs, figs and tabs

  4. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  5. The e7 guide to implementing projects under the Clean Development Mechanism

    International Nuclear Information System (INIS)

    2003-09-01

    The e7 was formed in 1992 to play an active role in global electricity issues and to promote sustainable development. It consists of nine leading electricity companies: American Electric Power (United States), Electricite de France (France), ENEL (Italy), Hydro-Quebec (Canada), The Kansai Electric Power Company, Inc. (Japan), Ontario Power Generation, Inc. (Canada), RWE (Germany), ScottishPower (United Kingdom), and Tokyo Electric Power Company (Japan). This report provides a guide to help develop projects under the Clean Development Mechanism (CDM), which is an instrument that allows public or private entities to invest in greenhouse gas (GHG) mitigating activities in developing countries and earn credits in an emission trading system. The dual objectives of the CDM, one of three mechanisms set out in the Kyoto Protocol, are the reduction of global GHG emissions and a contribution to sustainable development in the host country. The guidelines and procedures detailed by the United Nations Framework Convention on Climate Change (UN FCCC) and the related Protocols and Accords, were followed in the preparation of this document. Recommendations based on e7 experience were also included. The criteria for success were stated, and additionality was discussed. Additionality refers to the reductions of emissions that are additional to any that would occur in the absence of the certified project activity. The baseline methodology was described. Project Design Document (PDD) is the format that must be used for presenting the information pertaining to a project and its evaluation. PDD contents include: general description of the project activity, baseline methodology, identification of crediting period, monitoring methodology and plan, calculation of GHG emissions by sources, environmental impacts, and stakeholder comments. Third party verification, and project risk and transaction costs were also addressed. refs., tabs., figs

  6. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  7. Project finance and international energy development

    International Nuclear Information System (INIS)

    Pollio, G.

    1998-01-01

    This paper explores the preference for and the features unique to project finance, one of the favoured vehicles for funding energy development. Our main focus is on the interests of project sponsors, commercial banks and host governments. Inclusion of the latter reflects the fact host governments are often leading participants in primary energy and energy-related projects; more recently, they have come to use limited recourse structures to finance local infrastructure development. Traditional analyses, whilst providing useful insights into the interests of leading project participants, are incapable of isolation a single motive or set of motives that can comprehensively account for all of the features common to this form of debt. Within an options-theoretic framework, most of these ambiguities are resolved. Risk management, long recognised as one of the primary reasons for choosing project finance over rival debt structures, is affirmed as a key explanatory factor. One the other hand, options pricing theory provides a radically different perspective on how to project finance contributes to the realisation of these objectives. (author)

  8. Sniffer project development

    CERN Document Server

    Grau, S; CERN. Geneva. ST Division

    2002-01-01

    To ensure the safety of the personnel, and prevent major damage to the equipment in the LHC experiments, a combined fire and gas detection system is being developed in conjunction with the industry. This system named SNIFFER, shall detect fire, flammable gas leaks and oxygen deficiency. In addition it shall interface with the Experiments' Control System and the CERN Safety Alarm Monitoring system. The SNIFFER project is currently at the end of the prototyping phase, and the technical specification is being written for the outsourcing of the system. The purpose of this document is to describe the main functions, constraints and interfaces of the system, to present the status report and planning of the project, and to explain the preliminary conclusions of the prototyping phase.

  9. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  10. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  11. Renewable energy project development

    Energy Technology Data Exchange (ETDEWEB)

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  12. Leadership and Project Success in Development Sector

    Directory of Open Access Journals (Sweden)

    Saghir Ahmed

    2017-10-01

    Full Text Available Aim/purpose - The study aims to investigate the relationship among the leadership, operational efficiency and project success in general and the impact of transformational leadership and operational efficiency on project success in particular. Design/methodology/approach - Mean comparison from descriptive statistics and multiple linear regression from inferential statistics was used to determine the association between variables and further impact of the transformational leadership and operational efficiency on project success in the development sector. The paper presents the results of a survey conducted among 200 employees from the top, middle & lower management levels of various national & international development organizations working in Pakistan like Microfinance Banks and other Rural Support Programs. Statistical Package for Social Sciences (SPSS was used to process data. Findings - The result shows positive association among transformational leadership, operational efficiency and project success. In addition, it was found that transformational leadership and operational efficiency have a positive and statistically significant impact on the project success. It is concluded that both transformational leadership and operational efficiency are vital to achieving the optimum level of success in any project, especially in the development sector. Research implications/limitations - The integral limitation of the study was the respondents because most of the development organizations have their operations in rural areas where access was difficult because of limited time and resources. In addition, such organizations are always reluctant to provide survey feedback. Originality/value/contribution - The paper contribution is in the theoretical and practical knowledge of the project success factors in the development sector which is still a somehow unexplored area. Regulators of the development sector may be benefited from this study.

  13. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  14. Management and Development of the Western Resources Project

    Energy Technology Data Exchange (ETDEWEB)

    Terry Brown

    2009-03-09

    The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

  15. Research and development project report for FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report summarizes results of research and development projects administered by NEDO for FY 1996. Overview of new energy projects and twelve chapters for individual projects are provided in the report. The new energy technology development projects administered by NEDO are classified into twelve categories, i.e., Development of technologies for solar energy utilization, Development of geothermal resources, Development of technologies for exploration and utilization of geothermal energy, Development of coal energy utilization technologies, Development of coal resources, Development of energy conversion and storage technologies, Development of hydrogen, alcohol and biomass technologies, Development of other oil-alternative energy technologies, Introduction and promotion of new energy sources, International energy-promotion activities, Promotion of development and introduction, and Activities of the NEDO Information Center. To ensure energy security and actively cope with environmental problems such as by taking carbon dioxide emission control measures, NEDO has stepped up its efforts to develop new energy- and energy saving-related technologies and introduce and diffuse them. 79 figs., 37 tabs.

  16. Neighborhood Energy/Economic Development project

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    Energy costs impact low income communities more than anyone else. Low income residents pay a larger percentage of their incomes for energy costs. In addition, they generally have far less discretionary energy use to eliminate in response to increasing energy prices. Furthermore, with less discretionary income, home energy efficiency improvements are often too expensive. Small neighborhood businesses are in the same situation. Improved efficiency in the use of energy can improve this situation by reducing energy costs for residents and local businesses. More importantly, energy management programs can increase the demand for local goods and services and lead to the creation of new job training and employment opportunities. In this way, neighborhood based energy efficiency programs can support community economic development. The present project, undertaken with the support of the Urban Consortium Energy Task Force, was intended to serve as a demonstration of energy/economic programming at the neighborhood level. The San Francisco Neighborhood Energy/Economic Development (NEED) project was designed to be a visible demonstration of bringing the economic development benefits of energy management home to low-income community members who need it most. To begin, a Community Advisory Committee was established to guide the design of the programs to best meet needs of the community. Subsequently three neighborhood energy/economic development programs were developed: The small business energy assistance program; The youth training and weatherization program; and, The energy review of proposed housing development projects.

  17. Developing a stochastic traffic volume prediction model for public-private partnership projects

    Science.gov (United States)

    Phong, Nguyen Thanh; Likhitruangsilp, Veerasak; Onishi, Masamitsu

    2017-11-01

    Transportation projects require an enormous amount of capital investment resulting from their tremendous size, complexity, and risk. Due to the limitation of public finances, the private sector is invited to participate in transportation project development. The private sector can entirely or partially invest in transportation projects in the form of Public-Private Partnership (PPP) scheme, which has been an attractive option for several developing countries, including Vietnam. There are many factors affecting the success of PPP projects. The accurate prediction of traffic volume is considered one of the key success factors of PPP transportation projects. However, only few research works investigated how to predict traffic volume over a long period of time. Moreover, conventional traffic volume forecasting methods are usually based on deterministic models which predict a single value of traffic volume but do not consider risk and uncertainty. This knowledge gap makes it difficult for concessionaires to estimate PPP transportation project revenues accurately. The objective of this paper is to develop a probabilistic traffic volume prediction model. First, traffic volumes were estimated following the Geometric Brownian Motion (GBM) process. Monte Carlo technique is then applied to simulate different scenarios. The results show that this stochastic approach can systematically analyze variations in the traffic volume and yield more reliable estimates for PPP projects.

  18. The dynamics of software development project management: An integrative systems dynamic perspective

    Science.gov (United States)

    Vandervelde, W. E.; Abdel-Hamid, T.

    1984-01-01

    Rather than continuing to focus on software development projects per se, the system dynamics modeling approach outlined is extended to investigate a broader set of issues pertaining to the software development organization. Rather than trace the life cycle(s) of one or more software projects, the focus is on the operations of a software development department as a continuous stream of software products are developed, placed into operation, and maintained. A number of research questions are ""ripe'' for investigating including: (1) the efficacy of different organizational structures in different software development environments, (2) personnel turnover, (3) impact of management approaches such as management by objectives, and (4) the organizational/environmental determinants of productivity.

  19. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    OpenAIRE

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  20. 25 CFR 170.623 - How are IRR Program projects and activities included in a self-governance agreement?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program projects and activities included in a self-governance agreement? 170.623 Section 170.623 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE... self-governance agreement? To include an IRR Program project or activity in a self-governance agreement...

  1. Incentive Mechanism of Micro-grid Project Development

    Directory of Open Access Journals (Sweden)

    Yong Long

    2018-01-01

    Full Text Available Due to the issue of cost and benefit, the investment demand and consumption demand of micro-grids are insufficient in the early stages, which makes all parties lack motivation to participate in the development of micro-grid projects and leads to the slow development of micro-grids. In order to promote the development of micro-grids, the corresponding incentive mechanism should be designed to motivate the development of micro-grid projects. Therefore, this paper builds a multi-stage incentive model of micro-grid project development involving government, grid corporation, energy supplier, equipment supplier, and the user in order to study the incentive problems of micro-grid project development. Through the solution and analysis of the model, this paper deduces the optimal subsidy of government and the optimal cooperation incentive of the energy supplier, and calculates the optimal pricing strategy of grid corporation and the energy supplier, and analyzes the influence of relevant factors on optimal subsidy and incentive. The study reveals that the cost and social benefit of micro-grid development have a positive impact on micro-grid subsidy, technical level and equipment quality of equipment supplier as well as the fact that government subsidies positively adjust the level of cooperation incentives and price incentives. In the end, the validity of the model is verified by numerical analysis, and the incentive strategy of each participant is analyzed. The research of this paper is of great significance to encourage project development of micro-grids and to promote the sustainable development of micro-grids.

  2. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  3. Are Project Developers Knights and Researchers Queens?

    DEFF Research Database (Denmark)

    Vinstrup, Anya Bjørn

    2014-01-01

    How do project developers at universities view their customers – the researchers, and how do they see themselves as a profession? Does this view influence their motivation and what challenges does it impose? Taking elements of theory from Public Service Motivation (PSM) and linking it with a small...... empirically based survey among the project developers at a centrally located office at a university in Denmark – these questions are sought to be answered. The focal point being the motivation of the project developer, with special emphasis on their user perception, and the practical implications it has...... for leadership and organisational structures....

  4. Smart Grid Development: Multinational Demo Project Analysis

    Directory of Open Access Journals (Sweden)

    Oleinikova I.

    2016-12-01

    Full Text Available This paper analyses demand side management (DSM projects and stakeholders’ experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO and transmission system operator (TSO. This paper is prepared as an extract from the global smart grid best practices, smart solutions and business models.

  5. Smart Grid Development: Multinational Demo Project Analysis

    Science.gov (United States)

    Oleinikova, I.; Mutule, A.; Obushevs, A.; Antoskovs, N.

    2016-12-01

    This paper analyses demand side management (DSM) projects and stakeholders' experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR) and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO) and transmission system operator (TSO). This paper is prepared as an extract from the global smart grid best practices, smart solutions and business models.

  6. Product development projects dynamics and emergent complexity

    CERN Document Server

    Schlick, Christopher

    2016-01-01

    This book primarily explores two topics: the representation of simultaneous, cooperative work processes in product development projects with the help of statistical models, and the assessment of their emergent complexity using a metric from theoretical physics (Effective Measure Complexity, EMC). It is intended to promote more effective management of development projects by shifting the focus from the structural complexity of the product being developed to the dynamic complexity of the development processes involved. The book is divided into four main parts, the first of which provides an introduction to vector autoregression models, periodic vector autoregression models and linear dynamical systems for modeling cooperative work in product development projects. The second part presents theoretical approaches for assessing complexity in the product development environment, while the third highlights and explains closed-form solutions for the complexity metric EMC for vector autoregression models and linear dyn...

  7. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  8. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  9. Projected oriented organizations as development of enterprise management methods

    Directory of Open Access Journals (Sweden)

    S.I. Pavlova

    2016-12-01

    Full Text Available Dynamic external environment, significant shortage of product life cycle, increase of product technological difficulty, extension of innovative knowledge motivates managers to look for and use in their activities keys that will provide constant, stable development of organizational structures. The methodology of project enterprise management meets the requirements of «preservation through development». The articles researches the integration of methods and procedures of project management into the enterprise management system. Project management philosophy is the efficient way of existence in the competitive environment and the means for internal development of a company. The author conducts an analysis, determines the essence and peculiarities of a project-oriented enterprise, performs comparing characteristics of functional and project management, describes the stages of gradual transformation of an enterprise organizational structure into a project-oriented one. It is defined that a project-oriented enterprise is that one which functions on the base of innovative development and are scientific, creative and widely use the project activity as the means of a steady development. The article describes internal and external instruments of project management, base knowledge systems on project management and possibilities of enterprises on audit of state of system project management in an enterprise according to the IPMA certification program on the territory of Ukraine.

  10. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  11. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  12. Evaluating Tobacco Control Policies in 28 Countries (including 9 EU countries: The ITC Project

    Directory of Open Access Journals (Sweden)

    Geoffrey Fong

    2016-03-01

    Full Text Available Since its start in 2002, the ITC Project has been conducting evaluation studies of tobacco control policies via prospective cohort surveys of tobacco users in 28 countries, including 9 EU countries. This presentation will focus on the design of the ITC Project and how it differs from and complements existing evidence-gathering systems (monitoring and surveillance systems in measuring and understanding the impact of FCTC policies. The presentation will also describe the ITC Project's most recent initiatives: (1 the EUREST-PLUS study focusing on measuring the impact of the Tobacco Products Directive, and (2 a large-scale international cohort study of e-cigarettes starting in the United States, Canada, England, and Australia.

  13. Development of a multimode navigation system for an assistive robotics project

    OpenAIRE

    Cherubini , Andrea; Oriolo , G; Macri , F; Aloise , F; Babiloni , F; Cincotti , F; Mattia , D

    2007-01-01

    International audience; Assistive technology is an emerging area where robotic devices can be used to strengthen the residual abilities of individuals with motor disabilities or to help them achieve independence in the activities of daily living. This paper deals with a project aimed at designing a system that provides remote control of home-installed appliances, including the Sony AIBO, a commercial mobile robot. The development of the project is described by focusing on the design of the ro...

  14. Students’ intellectual development measures as an effective tool of personality development dynamics monitoring in project activities

    Directory of Open Access Journals (Sweden)

    Faleeva A.A.

    2017-04-01

    Full Text Available this article reveals the method of an educational technology project, which includes a set of research, problem of methods, creative by its very nature. The integration of knowledge is achieved by the method of projects. Individual style of student learning should be based on consideration of the individual characteristics of each student, mental development characteristics, temperament, type of nervous activity. It is important to show students their own interest to acquire the knowledge that they will need in life.

  15. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    Science.gov (United States)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  16. Social acceptability of new territorial development projects

    International Nuclear Information System (INIS)

    1993-05-01

    This paper reviews the historical evolution of environmental awareness over the last three decades. The aspects covered include: the growing economic interdependence of nations, the development of new technologies, the internationalization of human rights and the phenomenon of organized trans-nationalism. The paper then develops a framework of territorial development assessment criteria embodying the United Nation's approach towards sustainable growth in which the rights of the human individual to a healthy life in harmony with nature are placed at the forefront of all sustainable growth decision making. Examples of decisional processes during actual hearings to decide on the go-ahead of energy development projects in Italy (a district heating system and a combined cycle gas turbine power plant) are given to evidence optimum ways to have public participation and interaction with government and expert committees take place in line with the United Nation's approach towards development. An important element dealt with is how to optimize the dissemination and use of information

  17. What is ′Successful Development′ in Conservation and Development Projects? Insights from Two Nicaraguan Case Studies

    Directory of Open Access Journals (Sweden)

    Sandra K Znajda

    2014-01-01

    Full Text Available The lack of clear indications of success in integrated conservation and development projects has resulted in strong criticisms of these projects, and a call for the return to conservation activities that exclude local communities. Impeding this discussion is the lack of clarity around how project success is defined and measured in conservation and development projects, especially in terms of development goals. This study involved an in-depth exploration of two agroforestry-focused conservation and development projects in Nicaragua to provide insights into how success in reaching development goals is interpreted in such projects. In both projects, development was equated with increased household income, in contrast to more contemporary definitions that include aspects such as self-respect and social integration. Both projects in turn relied on income as a measure of development success, which ultimately lessened attention to impacts not easily measured quantitatively as well as participant perspectives on desired goals. The paper concludes with a discussion of implications for conservation practitioners; specifically the need for better alignment of project goals with contemporary explanations of development, and a need to move beyond primarily numerical indicators to measure change through an interdisciplinary approach in order to have a more comprehensive understanding of project impacts.

  18. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorus uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery levels which assure the project viability technicaly and economicaly. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  19. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorous uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery leves which assure the project viability technically and economically. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  20. A method to study the management of urban development projects

    NARCIS (Netherlands)

    Heurkens, E.

    2011-01-01

    The management of urban development projects in the Netherlands has changed significantly in recent years. These projects have become mainly ‘led’ by developers as they manage the entire life cycle of development projects, while public actors mainly facilitate development projects. This changes the

  1. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  2. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, Fanny; van Wissen, Leo J. G.; Kunst, Anton E.

    2013-01-01

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e 0) for the Netherlands up

  3. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, Fanny; van Wissen, Leo J. G.; Kunst, Anton E.

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e (0)) for the Netherlands up

  4. THE DEVELOPMENT OF SUSTAINABLE CROPPING SYSTEMS IN THE HIGHLANDS OF SOUTH-EAST ASIA: GENERAL LESSONS FOR DEVELOPMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Michael A. Fullen

    2005-05-01

    Full Text Available Soil conservation in the highlands of South-East Asia is essential for sustainable agro-environmental development. The effectiveness of soil conservation treatments developed in runoff plots was investigated in farmer-managed plots on a natural catchment. This wasachieved by the development and scientific evaluation of modified and novel cropping practices in a representative highland catchment in Yunnan Province, China. Wang Jia Catchment covers 40.1 hectares near Kedu, in Xundian County, north-east Yunnan (25o28'N, 102o53'E. The initial project consisted of an evaluation of the effects of modified cropping practices on maize productivity and soil properties. This programme was extended to investigate ways of increasing the productivity of maize, wheat and soybean on fragile slopes in a sustainable and environmentally-friendly way. The approach incorporates modified and novel agronomic and soil conservation measures, with the evaluation of their agricultural, environmental and socio-economic impacts using multidisciplinary approaches. This European Union funded project involved an international research team from Belgium, China, Ireland, Thailand and the U.K. Five co-ordinated work packages were implemented. Involving: (1 Background agricultural and environmental assessment of Wang Jia Catchment. (2Implementation and evaluation of modified and novel cropping systems for wheat, maize and soybean in the catchment. (3 Cost-benefit analyses of the socio-economic impacts of the changed cropping practices. (4 Comparative scientific evaluation of the cropping techniques in the highlands of northern Thailand. (5 Dissemination of project outcomes and establishment of training programmes for best practice in highland rural development. The lessons of the Project for promoting sustainable agro-environmental development in tropical and subtropical highlands include: (1 Recognizing the importance of both ‘north-south’ and ‘south-south’ co

  5. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, F.; van Wissen, L.J.G.; Kunst, A.E.

    2013-01-01

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e0) for the Netherlands up to

  6. Survey indicated that core outcome set development is increasingly including patients, being conducted internationally and using Delphi surveys.

    Science.gov (United States)

    Biggane, Alice M; Brading, Lucy; Ravaud, Philippe; Young, Bridget; Williamson, Paula R

    2018-02-17

    There are numerous challenges in including patients in a core outcome set (COS) study, these can vary depending on the patient group. This study describes current efforts to include patients in the development of COS, with the aim of identifying areas for further improvement and study. Using the COMET database, corresponding authors of COS projects registered or published from 1 January 2013 to 2 February 2017 were invited via a personalised email to participate in a short online survey. The survey and emails were constructed to maximise the response rate by following the academic literature on enhancing survey responses. Personalised reminder emails were sent to non-responders. This survey explored the frequency of patient input in COS studies, who was involved, what methods were used and whether or not the COS development was international. One hundred and ninety-two COS developers were sent the survey. Responses were collected from 21 February 2017 until 7 May 2017. One hundred and forty-six unique developers responded, yielding a 76% response rate and data in relation to 195 unique COSs (as some developers had worked on multiple COSs). Of focus here are their responses regarding 162 COSs at the published, completed or ongoing stages of development. Inclusion of patient participants was indicated in 87% (141/162) of COSs in the published completed or ongoing stages and over 94% (65/69) of ongoing COS projects. Nearly half (65/135) of COSs included patient participants from two or more countries and 22% (30/135) included patient participants from five or more countries. The Delphi survey was reported as being used singularly or in combination with other methods in 85% (119/140) of projects. Almost a quarter (16/65) of ongoing studies reported using a combination of qualitative interviews, Delphi survey and consensus meeting. These findings indicated that the Delphi survey is the most popular method of facilitating patient participation, while the combination of

  7. Development of a Career Enhancement Training is Inherent Part of an Educational Project

    Directory of Open Access Journals (Sweden)

    Gabdrakhmanova R.G.

    2015-11-01

    Full Text Available Career enhancement training is common for teachers, yet participating in the project requires special training. Project training courses expose project objectives and allow getting necessary skills, materials and tools to determine the results. Training course have to include a content for which teachers will need to make a report. R. A. Valeeva, Ph.D., Professor, was the manager of a projectDevelopment and testing of new modules and rules for the implementing of the basic bachelor educational program in an "Education and Pedagogy" aggregated group (psycho-pedagogical training direction, which implies academic mobility of students studying education science (non-educational training directions in the context of networking”. To implement the project, it was decided to establish close partnerships with five higher educational institutions in the country. We have developed training courses to prepare teaching and resource staff of our university, as well as our partners to strong partnership in the project execution.

  8. Energy research and development projects in the Nordic countries. Directory 1987

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This is the fifth directory of research, development and demonstration projects in the Nordic countries within the field of energy. The directory includes projects running in 1987. 2378 projects are described, all of them financed through special public funds (i.e. external funding). The energy research organisation in each Nordic country is briefly reviewed in the appendixes, and a list of relevant newsletters are given. The directory is published at the request of the Nordic Council of Ministers and a special Energy Research Committee set up by the Nordic energy ministers in order to coordinate and promote Nordic information sharing in the energy field. (author)

  9. Retrieval process development and enhancements project Fiscal year 1995: Simulant development technology task progress report

    International Nuclear Information System (INIS)

    Golcar, G.R.; Bontha, J.R.; Darab, J.G.

    1997-01-01

    The mission of the Retrieval Process Development and Enhancements (RPD ampersand E) project is to develop an understanding of retrieval processes, including emerging and existing technologies, gather data on these technologies, and relate the data to specific tank problems such that end-users have the requisite technical bases to make retrieval and closure decisions. The development of waste simulants is an integral part of this effort. The work of the RPD ampersand E simulant-development task is described in this document. The key FY95 accomplishments of the RPD ampersand E simulant-development task are summarized below

  10. Workforce development and effective evaluation of projects.

    Science.gov (United States)

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  11. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  12. Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods.

    Science.gov (United States)

    Devendra, C

    2013-01-01

    The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agro-ecological zones (AEZs), including 570 breeds and 64% share of the breeds. They occupy a very important biological and socio-economic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D) are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of ruminants in which

  13. Development and implementation of a science training course for breast cancer activists: Project LEAD (leadership, education and advocacy development).

    Science.gov (United States)

    Dickersin, K; Braun, L; Mead, M; Millikan, R; Wu, A M; Pietenpol, J; Troyan, S; Anderson, B; Visco, F

    2001-12-01

    To develop and implement Project LEAD (leadership, education, and advocacy development), a science course for breast cancer activists. Students were breast cancer activists and other consumers, mainly affiliated with advocacy organizations in the United States of America. Project LEAD is offered by the National Breast Cancer Coalition; the course takes place over 5 days and is offered 4 times a year, in various cities in the United States of America. The Project LEAD curriculum has developed over 5 years to include lectures, problem-based study groups, case studies, interactive critical appraisal sessions, a seminar by an 'expert' scientist, role play, and homework components. A core faculty has been valuable for evaluating and revising the course and has proved necessary to provide consistent high quality teaching. Course evaluations indicated that students gained critical appraisal skills, enhanced their knowledge and developed confidence in selected areas of basic science and epidemiology. Project LEAD comprises a unique curriculum for training breast cancer activists in science and critical appraisal. Course evaluations indicate that students gain confidence and skills from the course.

  14. Critical Success Factors of Mobile Application Development Projects: A Qualitative Study

    Directory of Open Access Journals (Sweden)

    Hamza Khastar

    2016-07-01

    Full Text Available This study seeks to identify the critical success factors of teams in the application-development project. To achieve this goal, a qualitative approach and content analysis was utilized. Semi-structured interviews with 14 developers and experts was performed for data collection. A systematic review of previous research shows that after 9 critical success factors. With the analysis interviews, the CSf's raised to 12; including user experience, strategy and project management, support and promotion, business models, planning and goal setting, financial and budgeting, marketing and customer needs, infrastructure, technical issues and design, contextual factors, teamwork and staffing. The results show that the customer experience, teamwork and contextual factors are core categories in the research paradigm model.

  15. Integrating HCI Specialists into Open Source Software Development Projects

    Science.gov (United States)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  16. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  17. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  18. Aurora Borealis. Project Cycle Management in Regional Development

    OpenAIRE

    Andra Aldea-Partanen; Heimo Keränen; Susanna Nevalainen

    2003-01-01

    This paper aims to analyse Project Cycle Management approach in the context of regional development. The theoretical framework covers contemporary concepts typical for regional development and specific project/programme management tools. The comparative approach is used to take into account the two versions of Project Cycle Management presented by European Commission among evaluation methods and instruments, in 1993 and 2001. A practical application is drawn using mid-term evaluation of Baren...

  19. Girassol I. Girassol development: project challenges and reservoir uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Bancelin, J.P.; Pelleau, R.; Serceau, A. [TotalFinaElf, la Defense 6, 92 - Courbevoie (France)

    2002-10-01

    The Girassol Field is located 210 km northwest of Luanda, the Angolan capital, and about 150 km from shore. Girassol was the first discovery made in the prolific Block 17. This was followed by Dalia, Rosa, Lirio, Jasmim, Cravo, Orchidea, etc. April 1996: Girassol field is discovered on Block 17 in deep waters, offshore Angola. July 1998: The Girassol development project is approved by all parties. December 2001: Less than three and a half years after approval, Girassol comes on-stream. By the end of 2001, daily production is 100000 b/d with the production plateau of 200000 b/d to be reached by April 2002. The reservoir, located in 1,400 m water depth, is large (10 km by 14 km). Estimated oil in place is 1,550 mmbbls with recoverable reserves put at 725 mmbbls. The oil quality of 32 deg API is close to Brent specifications. The Girassol development scheme is based on 39 sub-sea wells - 23 oil producers, 14 water injectors and two gas injectors. The field will be developed in two phases: the first phase, completed in December 2001, includes 11 wells - eight oil producers, two water injectors and one gas injector. The second phase development is ongoing and will be completed mid-2003. The overall investment for the two phases of the Girassol development is US$ 2.8 bn. The Girassol project team had to fulfill three main objectives: first priority was given to technical quality; second priority was to closely monitor the development budget and contain the final cost; third priority was to achieve first oil as early as possible. Describe the Girassol reservoir and explain the main subsurface uncertainties; describe the selected development scheme; explain Girassol's major challenges; describe the contractual strategy information on cost, schedule and the project organisation are given. (authors)

  20. U.S. Department of Energy Wind Turbine Development Projects

    International Nuclear Information System (INIS)

    Migliore, P.G.; Calvert, S.D.

    1999-01-01

    This paper provides an overview of wind-turbine development activities in the Unites States and relates those activities to market conditions and projections. Several factors are responsible for a surge in wind energy development in the United States, including a federal production tax credit, ''green power'' marketing, and improving cost and reliability. More development is likely, as approximately 363 GW of new capacity will be needed by 2020 to meet growing demand and replace retiring units. The U.S. Department of Energy (DOE) is helping two companies develop next-generation turbines intended to generate electricity for $0.025/kWh or less. We expect to achieve this objective through a combination of improved engineering methods and configuration advancements. This should ensure that wind power will compete effectively against advanced combined-cycle plants having projected generating costs of $0.031/kWh in 2005. To address the market for small and intermediate-size wind turbines, DOE is assisting five companies in their attempts to develop new turbines having low capital cost and high reliability. Additional information regarding U.S. wind energy programs is available on the internet site www.nrel.gov/wind/. E-mail addresses for the turbine manufacturers are found in the Acknowledgements

  1. New developments in Generator Services project

    International Nuclear Information System (INIS)

    Karneyeu, A; Kirsanov, M; Konstantinov, D; Ryabov, A; Zenin, O; Pokorski, W; Ribon, A

    2011-01-01

    The LOG Generator Services project provides validated, LOG compliant Monte Carlo generators code for both the theoretical and experimental communities at the LHC. In this paper we present the recent developments and the future plans of the project. We report on the current status of the generators repository, the new Autotools-based build system, as well as the new installation tools to create mirrors of the repository. We discuss new developments in testing and physics validation procedures in particular the use of HepMC Analysis Tool, as well as the Rivet validation tool. We also present a new activity, enlarging the scope of the Generator Services project, it is the involvement in the tuning of the Monte Carlo generators. This work, being essential for the understanding of the future LHC data, is now starting with the involvement of all the LHC experiments.

  2. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Bonnal, P. [CERN; Féral, B. [CERN; Kershaw, K. [CERN; Nicquevert, B. [CERN; Baudin, M. [Ecole Normale Superieure; Lari, L. [ESS, Lund; Le Cardinal, J. [Chatenay-Malabry, Ecole Centrale

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  3. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  4. Design considerations of the World Bank-assisted $55 million photovoltaic market development project in India

    International Nuclear Information System (INIS)

    Cabraal, A.; Bradley, J.

    1993-01-01

    The World Bank's first loan for photovoltaic (PV) power systems was approved on December 17, 1992. The $55-million project will offer concessional financing through the Indian Renewable Energy Development Agency (IREDA) for the purchase of PV systems. The objective of the PV Market Development Project is to encourage the establishment of sustainable product supply, delivery, after-sales service, and financing mechanisms to support marketing PV products on a commercial basis. This paper outlines the issues and steps involved in the project design including: (1) technical viability, (2) financial and economic viability, (3) infrastructure issues, and (4) the economic and financial viability of the project as a whole

  5. CMIP5-based global wave climate projections including the entire Arctic Ocean

    Science.gov (United States)

    Casas-Prat, M.; Wang, X. L.; Swart, N.

    2018-03-01

    This study presents simulations of the global ocean wave climate corresponding to the surface winds and sea ice concentrations as simulated by five CMIP5 (Coupled Model Intercomparison Project Phase 5) climate models for the historical (1979-2005) and RCP8.5 scenario future (2081-2100) periods. To tackle the numerical complexities associated with the inclusion of the North Pole, the WAVEWATCH III (WW3) wave model was used with a customized unstructured Spherical Multi-Cell grid of ∼100 km offshore and ∼50 km along coastlines. The climate model simulated wind and sea ice data, and the corresponding WW3 simulated wave data, were evaluated against reanalysis and hindcast data. The results show that all the five sets of wave simulations projected lower waves in the North Atlantic, corresponding to decreased surface wind speeds there in the warmer climate. The selected CMIP5 models also consistently projected an increase in the surface wind speed in the Southern Hemisphere (SH) mid-high latitudes, which translates in an increase in the WW3 simulated significant wave height (Hs) there. The higher waves are accompanied with increased peak wave period and increased wave age in the East Pacific and Indian Oceans, and a significant counterclockwise rotation in the mean wave direction in the Southern Oceans. The latter is caused by more intense waves from the SH traveling equatorward and developing into swells. Future wave climate in the Arctic Ocean in summer is projected to be predominantly of mixed sea states, with the climatological mean of September maximum Hs ranging mostly 3-4 m. The new waves approaching Arctic coasts will be less fetch-limited as ice retreats since a predominantly southwards mean wave direction is projected in the surrounding seas.

  6. Financing of nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1991-06-01

    This document is a summary of the ''Topical Seminar on Financing of Nuclear Power Projects in Developing Countries, held in Jakarta between 4-7 September, 1990. The seminar presentations were divided into the following sessions: Keynote session (3 papers), Perspective of Nuclear and Fossil-fired Generation Costs (9 papers), Assessment of Problems and Constraints for the Financing of Large Power Projects, with particular Attention to Nuclear Power Projects (9 papers), Mechanisms for Financing Nuclear Power Projects in Developing Countries (11 papers). A separate abstract was prepared for each of these papers. Refs, figs, tabs and charts

  7. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  8. 31 CFR 537.411 - Purchase of shares in economic development projects in Burma.

    Science.gov (United States)

    2010-07-01

    ... SANCTIONS REGULATIONS Interpretations § 537.411 Purchase of shares in economic development projects in Burma... Burma of shares of ownership, including an equity interest, in the economic development of resources... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Purchase of shares in economic...

  9. Youths Attitude To Rural Development Projects In Ogba ...

    African Journals Online (AJOL)

    ... encourage youths to participate more in rural development projects. Also, training in the form of participatory seminars and workshops would help the youths to be more proactive. Keywords: Youths attitude, rural development projects, Ogba communities, Rivers State, Nigeria Global Approaches to Extension Practice Vol.

  10. A policy for development of project management. Projektijuhtimise arendamise poliitika

    Directory of Open Access Journals (Sweden)

    Arvi Kuura

    2013-01-01

    Full Text Available The share of temporary tasks and activities organised through projects and/or programmes is increasing in modern societies and also in businesses, non-profit and public organisations. To manage an increasing load of projects and programmes, the majority of organisations employ more skilled project management professionals and develop their project management capabilities. Against that background, most governments globally have not paid much attention to the development of project management. In other words, the project management capability (or maturity has not been a macro-level or policy concern. The article explores the importance of project management capabilities and the need for suitable policies, and outlines a policy for the development of project management

  11. Sustainable development benefits of clean development mechanism projects

    International Nuclear Information System (INIS)

    Olsen, Karen Holm; Fenhann, Jorgen

    2008-01-01

    The clean development mechanism (CDM) is part of the global carbon market developing rapidly in response to global warming. It has the twin objective to achieve sustainable development (SD) in host countries and assist Annex-1 countries in achieving their emission reduction targets in a cost-efficient manner. However, research has shown that trade-offs between the two objectives exist in favour of cost-efficient emission reductions and that left to the market forces, the CDM does not significantly contribute to sustainable development. The main argument of the paper is the need for an international standard for sustainability assessment-additional to national definitions-to counter weaknesses in the existing system of sustainability approval by designated national authorities in host countries. The article develops a new methodology, i.e. a taxonomy for sustainability assessment based on text analysis of the 744 project design documents (PDDs) submitted for validation by 3 May 2006. Through analysis of the SD benefits of all CDM projects at aggregated levels, the strengths and limitations of the taxonomy are explored. The main policy implication of the research is to propose the taxonomy as the basis of an international verification protocol for designated operational entities (DOEs) for reporting, monitoring and verifying that potential SD benefits described in the PDDs are actually realized

  12. Optimising Impact in Astronomy for Development Projects

    Science.gov (United States)

    Grant, Eli

    2015-08-01

    Positive outcomes in the fields of science education and international development are notoriously difficult to achieve. Among the challenges facing projects that use astronomy to improve education and socio-economic development is how to optimise project design in order to achieve the greatest possible benefits. Over the past century, medical scientists along with statisticians and economists have progressed an increasingly sophisticated and scientific approach to designing, testing and improving social intervention and public health education strategies. This talk offers a brief review of the history and current state of `intervention science'. A similar framework is then proposed for astronomy outreach and education projects, with applied examples given of how existing evidence can be used to inform project design, predict and estimate cost-effectiveness, minimise the risk of unintended negative consequences and increase the likelihood of target outcomes being achieved.

  13. Hydropower in Hawaii: Developing the Wailuku River project

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  14. Framework for Project Development in the Renewable Energy Sector

    Energy Technology Data Exchange (ETDEWEB)

    Springer, R.

    2013-02-01

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  15. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  16. Mt. Apo geothermal project : a learning experience in sustainable development

    International Nuclear Information System (INIS)

    Ote, Leonardo M.; De Jesus, Agnes C.

    1997-01-01

    The Mt. Apo geothermal project, a critical component of the Philippine energy program met stiff opposition from 1988-1991. Seemingly unresolvable legal, environmental and cultural issues between the government developer, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) and various affected sectors delayed the project for two years. The paper discusses the efforts undertaken by the developer to resolve these conflicts through a series of initiatives that transformed the project into a legally, environmentally and socially acceptable project. Lastly, the PNOC-EDC experience has evolved a new set of procedures for the environmental evaluation of development project in the Philippines. (author)

  17. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  18. Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods

    Directory of Open Access Journals (Sweden)

    C. Devendra

    2013-01-01

    Full Text Available The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agro-ecological zones (AEZs, including 570 breeds and 64% share of the breeds. They occupy a very important biological and socio-economic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of

  19. Assessing health impacts of the Chad-Cameroon petroleum development and pipeline project: challenges and a way forward

    International Nuclear Information System (INIS)

    Utzinger, Juerg; Wyss, Kaspar; Moto, Daugla D.; Yemadji, N'Diekhor; Tanner, Marcel; Singer, Burton H.

    2005-01-01

    Health impact assessment (HIA) of projects, programmes and policies is increasingly recognized as a powerful methodology for mitigating negative health impacts and enhancing equitable and sustainable development, yet applications in the developing world are sparse. Here, we focus on a large infrastructure development in sub-Saharan Africa, namely the Chad-Cameroon petroleum development and pipeline project. We adapted a five-step process for HIA, consisting of (1) screening of project documents, (2) profiling of affected communities, (3) identifying priority health areas, predicting potential impacts, and proposing mitigation measures, (4) implementing interventions, and (5) monitoring and evaluation of health impacts. We found that project scoping was broad, including extensive environmental and social assessments. Innovative features of the project include the high degree of public-private partnerships, and the management of oil revenues for purposes of poverty reduction. The project also addressed occupational and public health issues, and developed and implemented measures to prevent or mitigate potential health impacts. However, there was a disproportionate emphasis on workers' health, particularly on the prevention/mitigation of construction-related injuries, sexually transmitted infections (STIs; mainly HIV/AIDS), and malaria. Health impacts among surrounding communities, and cumulative health impacts in the larger region were not considered in a comprehensive way. Concluding, there is a need for a more systemic approach to HIA and its incorporation within 'Equator Principles', which are increasingly adopted by the international financial community. This process would include clarification of corporate social responsibility beyond the project fence line in the mitigation of health problems at regional levels. Finally, we propose the establishment and running of a longitudinal demographic surveillance system, which--coupled with regular household surveys

  20. Geographic information system development in the CARETS project

    Science.gov (United States)

    Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.

    1977-01-01

    Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.

  1. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  2. Quality assurance in technology development for The Clinch River Breeder Reactor Plant Project

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1980-01-01

    The Clinch River Breeder Reactor Plant Project is the nation's first large-scale demonstration of the Liquid Metal Fast Breeder Reactor (LMFBR) concept. The Project has established an overall program of plans and actions to assure that the plant will perform as required. The program has been established and is being implemented in accordance with Department of Energy Standard RDT F 2-2. It is being applied to all parts of the plant, including the development of technology supporting its design and licensing activity. A discussion of the program as it is applied to development is presented

  3. Project management plan double-shell tank system specification development

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1998-01-01

    The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Energy (DOE) to support removal of wastes from the Hanford Site 200 Area tanks in two phases. The schedule for these phases allows focusing on requirements for the first phase of providing feed to the privatized vitrification plants. The Tank Waste Retrieval Division near-term goal is to focus on the activities to support Phase 1. These include developing an integrated (technical, schedule, and cost) baseline and, with regard to private contractors, establishing interface agreements, constructing infrastructure systems, retrieving and delivering waste feed, and accepting immobilized waste products for interim onsite storage. This document describes the process for developing an approach to designing a system for retrieving waste from double-shell tanks. It includes a schedule and cost account for the work breakdown structure task

  4. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  5. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  6. International R and D project on development of coated particle fuel for innovative reactors

    International Nuclear Information System (INIS)

    Kendall, J.M.

    2001-01-01

    The paper presents an outline for an international collaborative project of coated particle fuel development for innovative reactors. Specific issues include identification of R and D needs and the Member State facilities for meeting the needs followed by development and demonstration of technology. (author)

  7. Financing arrangements for nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1993-01-01

    This reference book reviews the main features and problems or difficulties involved in the financing of nuclear power projects with special reference to developing countries. It provides basic information and advice to developing countries interested in nuclear power projects as part of their power sector planning. The book outlines the general characteristics of financing a nuclear power project and presents innovative approaches for power generation financing. It discusses the special conditions and requirements of nuclear power projects and their financing complexities. The focus is on the practical issues that need to be dealt with in order to successfully finance these power projects, as well as the constraints faced by most developing countries. Possible ways and means of dealing with these constraints are presented. 58 refs, figs and tabs

  8. Institutional support for projects development

    International Nuclear Information System (INIS)

    Tobar, Carlos

    2000-01-01

    The paper describes the institutional support to develop projects on renewable energy, also describes the different ways to obtain financial support from the public sector and the interaction among private sector, universities and non governmental agencies in training, research and generation of energy

  9. Sustainability, creativity and innovation in project management – Model development for assessing organizational performance through projects

    OpenAIRE

    Szabó, Lajos

    2016-01-01

    Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relat...

  10. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  11. RegionsТ Competition for Investment Projects in Forest Development

    Directory of Open Access Journals (Sweden)

    Valentina Fedorovna Lapo

    2014-06-01

    Full Text Available The author considers the problem of competition between regions for investments. It is hypothesized that the presence of legislative stimulating benefits in a particular region, ceteris paribus, promotes investment flows in forest projects from other regions and is an instrumentl of inter-regional competition. To test the hypotheses the researcher uses a modified model with spatial weighted exogenous variables in order to assess the spatial effects. The obtained estimates indicate the presence of spatial effects, both negative (an inter-regional competition for investment and positive (agglomeration effects. The author argues that the process of inter-regional competition for investment in projects on forest development is caused by benefits under taxes and payments into the regional budget, regulation of pricing (including actions by natural and local monopolies and depreciation policy and solutions to put some forest projects in the list of priority ones. Along with this, the paper identifies agglomeration effects induced by a number of benefits: direct dealings in investment by financing or property contribution, subsidies, state guarantees, credit security and partial payment of interest

  12. Project development for mining-metallurgical complexes for production of uranium concentrates - an analysis and a methodology

    International Nuclear Information System (INIS)

    Ajuria G, S.; Blanco P, B.; Pena A, J.; Manzanera Q, C.

    1978-10-01

    Activities comprising the development of a project for a mining-metallurgical complex for production of uranium concentrates, from sampling and evaluation of an orebody until plant start-up, are analyzed. The analysis of the orebody, characterization of the ore, bench scale and pilot plant metallurgical studies, environmental studies and economic analyses of the project are described. The mining project and mine preparation and engineering and construction of the plant are reviewed in less detail. The estimated time lapse for the development of a typical project under ideal conditions is 66 months. A bar diagram is included showing an approximate timetable for each activity. (author)

  13. The Unseen Face of E-Business Project Development

    OpenAIRE

    Mesnita, Gabriela; Vasilica, Tiberiu

    2003-01-01

    The purpose of this paper is intent on identify and analyze the unseen factors of successful or failure of e-business project development. The IT managers must take into account both all costs involved in e-business development and all phases (analysis, design, testing, implementation, maintenance and operation) according to principle of project management for software/systems life cycle development. There are many solutions to exceed these factors of failure among could be counted outsourcin...

  14. Governance Factors Affecting Community Participation In Public Development Projects In Meru District In Arusha In Tanzania

    Directory of Open Access Journals (Sweden)

    Jackson Estomih Muro

    2015-06-01

    Full Text Available ABSTRACT The purpose of this study was to have a fresh look at the local governance status through exploring governance factors affecting community participation in public development projects. The study also has investigated the actors and factors shaping participation as well as causes for non-participation. For the purpose of the study six wards within two divisions of Poli and Mbuguni and Meru district headquarters were selected. In the wards a total of 80 respondents from among the community members were interviewed through a structured questionnaire. Others were Village chairman Village Executive Officers Ward Executive Officers and Councilors were also interviewed and involved in the FGD. Data were analyzed using SPSS. Simple descriptive statistics and cross tabulation and figures were used in the analysis. The analysis showed that the communities were participated in the public development projects and people were participating through financial material and labor contribution to the public development projects. The analysis also showed that the government supported the ongoing public development projects including through provision of fund and expertise. The study showed the benefit of community participation in the development projects or programs like ownership of the projects and enjoying the benefits accrued from the projects. The study also indicated that there is significant change in terms of governance as influencers of community participation in public development projects. Despite the fortunes study showed some challenges found in wards and villages being the incidence of corruptions and misuse of public resources which were mentioned to slow community participation in public development projects. It was therefore concluded that adhering to the good governance principles contribute positively towards community participation in public development projects.

  15. Project-based faculty development for e-learning.

    Science.gov (United States)

    Vyas, Rashmi; Faith, Minnie; Selvakumar, Dhayakani; Pulimood, Anna; Lee, Mary

    2016-12-01

    The Christian Medical College, Vellore, in collaboration with Tufts University, Boston, conducted an advanced workshop in e-learning for medical faculty members in India. E-learning can enhance educational reforms for today's computer-literate generation, and keep faculty members up to speed in a rapidly changing world. The purpose of this paper is to report on the design and evaluation of a project-based faculty member development programme focused on developing faculty members as educators and as peer trainers who can use e-learning for educational reforms. During a 2-day workshop, 29 participants in groups of two or three developed 13 e-learning projects for implementation in their institutions. Evaluation of the workshop was through written feedback from the participants at the end of the workshop and by telephone interview with one participant from each project group at the end of one year. Content analysis of qualitative data was perfomed. The participants reported that they were motivated to implement e-learning projects and recognised the need for and usefulness of e-learning. The majority of projects (10 out of 13) that were implemented 'to some extent' or 'to a great extent' faced challenges with a lack of resources and administrative support, but faculty members were able to overcome them. E-learning can enhance educational reforms for today's computer-literate generation IMPLICATIONS: Designing feasible e-learning projects in small groups and obtaining hands-on experience with e-learning tools enhance the effectiveness of subsequent implementation. To successfully incorporate e-learning when designing educational reforms, faculty member training, continuing support and infrastructure facilities are essential. © 2016 John Wiley & Sons Ltd.

  16. Strip reduction testing of lubricants developed during ENFORM project

    DEFF Research Database (Denmark)

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  17. Minerals and energy: major development projects - April 2006 listing

    Energy Technology Data Exchange (ETDEWEB)

    William Mollard [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2006-06-15

    ABARE's project list, released around May and November each year, lists completed and committed projects in the minerals and energy sector in Australia. Santos' $200 million Casino gas field project in Bass Strait will produce natural gas and condensate while output from Berwyndale South will be coal seam methane. Five coal projects were completed in the six months to April 2006. The largest of these was Xstrata's Newlands Northern underground mine. In the same region, BMA's (BHP Billiton Mitsubishi Alliance) $102 million Broadmeadow underground mine and BHP/Mitsui Coal's $50 million Poitrel opencut mine, both near Moranbah, were brought into production. In New South Wales, two projects a new mine and a mine infrastructure development, both near Singletonwere commissioned. Xstrata's new Ravensworth West opencut mine will produce up to 1.5 million tonnes a year of thermal coal. Excel Coal's $73 million Wambo Rail project involved building a rail loop and loading facilities at its Wambo operation. Queensland coal mine projects and coal infrastructure developments account for 19 per cent (or $6.3 billion) of the estimated capital cost of $34 billion for all advanced projects. The largest coal mine development is the $1 billion Dawson mine expansion which is expected to add around 12 million tonnes of coking and thermal coal capacity, commencing in early 2007. Anglo Coal/Mitsui is also developing the large new Lake Lindsay opencut mine. Rio Tinto is developing its $440 million Clermont opencut mine. Twelve other advanced coal mine developments in Queensland are expected to raise coal production capacity by around 30 million tonnes a year by 2008. 10 figs., 4 tabs.

  18. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  19. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  20. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  1. Governance factors enabling knowledge transfer in interorganisational development projects

    NARCIS (Netherlands)

    Bosch-Sijtsema, Petra M.; Postma, Theo J. B. M.

    2010-01-01

    In this study we examine governance factors affecting knowledge transfer in interorganisational development projects. There is a gap in the literature indicating a need for more insights into processes of knowledge sharing and governance of interorganisational development projects. By using cases

  2. Financing the development of renewable energy projects of territorial interest

    International Nuclear Information System (INIS)

    Regnier, Yannick; Bailleul, Esther; Claustre, Raphael; Bessiere, Patrick; Boumard, Erwan; Peulemeulle, Justine; Causse, Laurent; Coton, Patrice; Djemouai, Nadia; Dubus, Jean-Michel; Duffes, Thomas; Gauduchon, Marie-Veronique; Raguet, Alex; Ghewy, Etienne; Heitz, Philippe; Jedliczka, Marc; Jourdain, Pierre; Julien, Emmanuel; Marcenac, Guillaume; Marillier, Frederic; Massias, Louis; Picot, Roland; Poize, Noemie; Quantin, Jacques; Rabian, Jean; Rocaboy, Dominique; Rumolino, Claudio; Sabin, Patrick; Saultier, Patrick; Tincelin-Salomon, Claire; Trillaud, Nicolas; Vachette, Philippe; Verhaeghe, Laure

    2016-11-01

    This report highlights the relationship between a territorial project (its autonomous strategy) and projects of renewable energy which could and should be developed. It focuses on large projects of electric power production, notably those based on solar and wind energy for which such a territorial anchoring is not as obvious as for the production of heat or gas (heat networks are necessarily local, and biomass production and supply as well). Thus, its outlines how these projects can be a benefit for a territory, the stakes of participation for the different local actors, and discusses how such a participation is to be organised. It describes different aspects of the way a project development phase is to be financed: stakes (financing needs, risks, peculiarities of local financing, project management and governance), financing typologies, development ease and safety, support of development financing (capital-risk tools, intervention of local public companies, advance payments, subsidies). The last part addresses how to locally finance the other project phases (stakes during construction and exploitation, intervention modes by participation, financial tools or loans)

  3. What's new with nurseries and reforestation projects at the Missoula Technology and Development Center?

    Science.gov (United States)

    Bob Simonson

    2011-01-01

    The USDA Forest Service Missoula Technology and Development Center (MTDC) offers technical expertise, technology transfer, and new equipment development to federal, state, and private forest nurseries. Current and recently completed projects at MTDC include a front and mid-mount tractor evaluation, ATV-pulled mechanical tree planter, greenhouse snow remover, freeze...

  4. The supervisor in the project-organized group work should participate in developing the students' project competencies

    DEFF Research Database (Denmark)

    Hansen, Søren

    2004-01-01

    The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects.......The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects....

  5. All projects related to Ethiopia | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    A comparative study of child marriage and parenthood in Ethiopia, India, Peru and Zambia. Project. The aim of this project is to enhance the understanding of the complexities of ... Entrepreneurship and small business development in Ethiopia.

  6. Role of Halden Reactor Project for world-wide nuclear energy development

    Energy Technology Data Exchange (ETDEWEB)

    McGrath, M.A.; Volkov, B.

    2011-07-01

    The great interest for utilization of nuclear materials to produce energy in the middle of last century needed special investigations using first class research facilities. Common problems in the area of nuclear fuel development motivated the establishment of joint research efforts. The OECD Halden Reactor Project (HRP) is a good example of such a cooperative research effort, which has been performing for more than 50 years. During that time, the Halden Reactor evolved from a prototype heavy water reactor envisaged as a power source for different applications to a research reactor that is able to simulate in-core conditions of modern commercial power reactors. The adaptability of the Halden Reactor enables the HRP to be an important international test facility for nuclear fuels and materials development. The long-term international cooperation is based on the flexible HRP organizational structure which also provides the continued success. [1,2] This paper gives a brief history of the Halden Reactor Project and its contribution to world-wide nuclear energy development. Recent expansion of the Project to the East and Asian countries may also assist and stimulate the development of a nuclear industry within these countries. The achievements of the HRP rely on the versatility of the research carried out in the reactor with reliable testing techniques and in-pile instrumentation. Diversification of scientific activity in the areas of development of alternative energy resources and man-machine technology also provide the HRP with a stable position as one of the leaders in the world scientific community. All of these aspects are described in this paper together with current experimental works, including the investigation of ULBA (Kazakhstan) production fuel in comparison with other world fuel suppliers, as well as other future and prospective plans of the Project.(Author)

  7. Role of Halden Reactor Project for world-wide nuclear energy development

    International Nuclear Information System (INIS)

    McGrath, M.A.; Volkov, B.

    2011-01-01

    The great interest for utilization of nuclear materials to produce energy in the middle of last century needed special investigations using first class research facilities. Common problems in the area of nuclear fuel development motivated the establishment of joint research efforts. The OECD Halden Reactor Project (HRP) is a good example of such a cooperative research effort, which has been performing for more than 50 years. During that time, the Halden Reactor evolved from a prototype heavy water reactor envisaged as a power source for different applications to a research reactor that is able to simulate in-core conditions of modern commercial power reactors. The adaptability of the Halden Reactor enables the HRP to be an important international test facility for nuclear fuels and materials development. The long-term international cooperation is based on the flexible HRP organizational structure which also provides the continued success. [1,2] This paper gives a brief history of the Halden Reactor Project and its contribution to world-wide nuclear energy development. Recent expansion of the Project to the East and Asian countries may also assist and stimulate the development of a nuclear industry within these countries. The achievements of the HRP rely on the versatility of the research carried out in the reactor with reliable testing techniques and in-pile instrumentation. Diversification of scientific activity in the areas of development of alternative energy resources and man-machine technology also provide the HRP with a stable position as one of the leaders in the world scientific community. All of these aspects are described in this paper together with current experimental works, including the investigation of ULBA (Kazakhstan) production fuel in comparison with other world fuel suppliers, as well as other future and prospective plans of the Project.(Author)

  8. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  9. Institutions of Catching-up Development (On the Project of a New Model for Economic Development of Russia

    Directory of Open Access Journals (Sweden)

    Viktor Meerovich Polterovich

    2016-11-01

    Full Text Available The article shows that institutional trajectories of catching-up development in successful countries including similar interim institutions; this similarity is explained by common technological, institutional and cultural limitations which need to be taken into account and overcome. Corporatism, indicative planning, the availability of the “general” development agency with broad mandate, undervalued exchange rate – these and some other mechanisms provide the countries of the “economic miracle” with an opportunity to initiate and maintain rapid economic growth despite the low level of human capital, underdeveloped civic culture and market failures. Institutions of catching-up development contributed to the formation of collaborative relations between the government, business and society. They eased the limitations and were gradually modified, providing a transition to modern democracies with efficient market economy. The conducted analysis helps outline a plan for an institutional reform taking into account Russia’s institutional features. The principles of administrative reform are considered. The author also sets the objective of forming a “hybrid” system of national planning which includes indicative planning and program budgeting. A combination of public-private partnership and program financing is proposed for the financing of the planned projects. The author proposes to use Japanese experience of promoting temporary association of companies for the development of modernization projects. The principles of reforming the systems of state property and science management are discussed

  10. Developing Project Duration Models in Software Engineering

    Institute of Scientific and Technical Information of China (English)

    Pierre Bourque; Serge Oligny; Alain Abran; Bertrand Fournier

    2007-01-01

    Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group(ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframeplatforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projectsre quiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as asecond independent variable to explain duration is also analyzed. The opportunity to build duration models directly fromproject functional size in function points is investigated as well.

  11. Real options and volume uncertainty by field development projects

    International Nuclear Information System (INIS)

    Ekern, S.; Stensland, G.

    1993-12-01

    The report concerns a study on the use of option methodology in field development projects. The report shows how the value of flexibility in the different decision processes is to be found by means of real option methodology. Particular attention is laid on the uncertainty concerning the volume of reserves and production capacity. The results from the study were based on the research project dubbed ''Use of real options in field development projects''. The project is partially connected to another project dubbed ''Decisive behaviour and alternative action under uncertainty in the petroleum sector''. Main topics cover as follow: Example with volume uncertainty; real options and volume uncertainty; gradual disclosure of uncertainty in the production; value of flexible production equipment. 33 refs., 19 figs., 17 tabs

  12. Development and field evaluation of animal feed supplementation packages (AFRA project II-17 - RAF/5/041). Project summary

    International Nuclear Information System (INIS)

    Makkar, H.P.S.

    2002-01-01

    The Joint FAO/IAEA programme has supported animal production research in Africa for many years through country Technical Co-operation (TC) Projects, Regional Projects (AFRA) and Co-ordinated Research Project (CRP). These activities have helped to build up the infrastructure needed in the countries concerned to conduct much of the research in animal reproduction and nutrition. In the past the Agency has provided technical assistance in defining reproductive indices of ruminant livestock species and identifying nutritional constraints to productivity of animals maintained on smallholder farms under various topographical and environmental conditions. In view of the satisfactory progress of AFRA Project VIII in identifying the major constraints to livestock productivity in the region, and the recognition of many Member States of the importance of supplementary feeding for improving milk and meat production, a regional strategy was proposed for developing affordable and sustainable supplementation packages for improving productivity from smallholder farms using locally available feed resources. The new Regional Project was initiated in 1997 with the following objectives: 1. To produce a supplementary feed in the form of a convenient and easy-to-use package for improving milk and meat production in peri-urban areas 2. To promote the uptake of this technology through demonstrations of its advantages in terms of increased productivity and benefit: cost ratio 3. To maximize the use of locally available feed material such as molasses, cereal bran, legume tree leaves, oil seed meals, etc. for feeding ruminant livestock, thereby reducing the use of high cost concentrate feeds 4. To promote technical co-operation amongst developing countries (TCDC) in the region and take advantage of established infrastructure and available human and technical resources to solve problems of common interest. From 1997 until 2000 the project has been operational with 13 Member States

  13. Growth and project finance in the least developed countries

    OpenAIRE

    Lisbeth F. la Cour; Jennifer Müller

    2014-01-01

    This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of ...

  14. Evolution of the GATE project: new results and developments

    Energy Technology Data Exchange (ETDEWEB)

    Santin, G. [ESA-ESTEC, Keplerlaan 1, 2200 AG Noordwijk (Netherlands); Staelens, S. [ELIS Department, Ghent University, B-9000 Ghent (Belgium); Taschereau, R. [CRUMP Institute for Molecular Imaging, University of California Los Angeles, 700 Westwood Plaza A438, Los Angeles, CA 90095-1770 (United States); Descourt, P. [U650 INSERM, LaTIM, Brest (France); Schmidtlein, C.R. [Memorial Sloan-Kettering Cancer Center, New York, New York, US (United States); Simon, L. [Department of Radiation Oncology, Institut Curie, Paris (France); Visvikis, D. [U650 INSERM, LaTIM, Brest (France); Jan, S. [Service Hospitalier Frederic Joliot (SHFJ), CEA-Orsay, Orsay (France); Buvat, I. [U678 INSERM, CHU Pitie-Salpetriere, Paris (France)

    2007-10-15

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry.

  15. Evolution of the GATE project: new results and developments

    International Nuclear Information System (INIS)

    Santin, G.; Staelens, S.; Taschereau, R.; Descourt, P.; Schmidtlein, C.R.; Simon, L.; Visvikis, D.; Jan, S.; Buvat, I.

    2007-01-01

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry

  16. Fast Charging Electric Vehicle Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Heny, Michael

    2014-03-31

    The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment

  17. Overview of ACTYS project on development of indigenous state-of-the-art code suites for nuclear activation analysis

    International Nuclear Information System (INIS)

    Subhash, P.V.; Tadepalli, Sai Chaitanya; Deshpande, Shishir P.; Kanth, Priti; Srinivasan, R.

    2017-01-01

    Rigorous activation calculations are warranted for safer and efficient design of future fusion machines. Suitable activation codes, which yield accurate results with faster performance yet include all fusion relevant reactions are a prerequisite. To meet these, an indigenous project called ACTYS-Project is initiated and as a result, four state-of-art codes are developed so far. The goal of this project is to develop indigenous state-of-the-art code suites for nuclear activation analysis

  18. Optimal sampling plan for clean development mechanism energy efficiency lighting projects

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A metering cost minimisation model is built to assist the sampling plan for CDM projects. • The model minimises the total metering cost by the determination of optimal sample size. • The required 90/10 criterion sampling accuracy is maintained. • The proposed metering cost minimisation model is applicable to other CDM projects as well. - Abstract: Clean development mechanism (CDM) project developers are always interested in achieving required measurement accuracies with the least metering cost. In this paper, a metering cost minimisation model is proposed for the sampling plan of a specific CDM energy efficiency lighting project. The problem arises from the particular CDM sampling requirement of 90% confidence and 10% precision for the small-scale CDM energy efficiency projects, which is known as the 90/10 criterion. The 90/10 criterion can be met through solving the metering cost minimisation problem. All the lights in the project are classified into different groups according to uncertainties of the lighting energy consumption, which are characterised by their statistical coefficient of variance (CV). Samples from each group are randomly selected to install power meters. These meters include less expensive ones with less functionality and more expensive ones with greater functionality. The metering cost minimisation model will minimise the total metering cost through the determination of the optimal sample size at each group. The 90/10 criterion is formulated as constraints to the metering cost objective. The optimal solution to the minimisation problem will therefore minimise the metering cost whilst meeting the 90/10 criterion, and this is verified by a case study. Relationships between the optimal metering cost and the population sizes of the groups, CV values and the meter equipment cost are further explored in three simulations. The metering cost minimisation model proposed for lighting systems is applicable to other CDM projects as

  19. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    Document available in extended abstract form only. The successful implementation of a repository programme relies on both the technical aspects of a sound safety strategy, and scientific and engineering excellence, as well as on social aspects such as public acceptance. Monitoring has the potential to contribute to both of these aspects and thus to play an important role as national radioactive waste disposal programmes move forward towards safe and accepted implementation of geological disposal. The main goal of the 'Monitoring Developments for Safe Repository Operation and staged Closure' (MoDeRn) Project is to take the state-of-the-art of broadly accepted, main monitoring objectives and to develop these to a level of description that is closer to the actual implementation of monitoring during the staged approach of the disposal process. It should be noted that the MoDeRn project recognizes the diversity of monitoring activities that will be required in a repository, in particular related to operational safety, nuclear safeguards and environmental impact assessment. The projects emphasis, however, is on monitoring conducted to verify expected repository system evolutions - i.e. evolutions of the natural environment and the engineered system - during a phase of progressive construction, operation and closure that may last on the order of a century. This serves the purpose of confirming and possibly enhancing the prior license basis for safety and pre-closure management options. Achieving this goal includes analysis of whether the implementation of a realistic monitoring programme is likely to address expert and lay stakeholder expectations (objectives), to provide an understanding of monitoring activities and available technologies that can be implemented in a repository context (feasibility), and to provide recommendations for related, future stakeholder engagement activities (social acceptance). These are carried out by the 18 project partners representing 12

  20. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  1. Development of a large-screen high-definition laser video projection system

    Science.gov (United States)

    Clynick, Tony J.

    1991-08-01

    A prototype laser video projector which uses electronic, optical, and mechanical means to project a television picture is described. With the primary goal of commercial viability, the price/performance ratio of the chosen means is critical. The fundamental requirement has been to achieve high brightness, high definition images of at least movie-theater size, at a cost comparable with other existing large-screen video projection technologies, while having the opportunity of developing and exploiting the unique properties of the laser projected image, such as its infinite depth-of-field. Two argon lasers are used in combination with a dye laser to achieve a range of colors which, despite not being identical to those of a CRT, prove to be subjectively acceptable. Acousto-optic modulation in combination with a rotary polygon scanner, digital video line stores, novel specialized electro-optics, and a galvanometric frame scanner form the basis of the projection technique achieving a 30 MHz video bandwidth, high- definition scan rates (1125/60 and 1250/50), high contrast ratio, and good optical efficiency. Auditorium projection of HDTV pictures wider than 20 meters are possible. Applications including 360 degree(s) projection and 3-D video provide further scope for exploitation of the HD laser video projector.

  2. Role of Renewable Energy Certificates in Developing New Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Holt, E.; Sumner, J.; Bird, L.

    2011-06-01

    For more than a decade, renewable energy certificates (RECs) have grown in use, becoming a common way to track ownership of the renewable and environmental attributes of renewable electricity generation. In recent years, however, questions have risen about the role RECs play in the decision to build new renewable energy projects. Information from a variety of market participants suggests that the importance of RECs in building new projects varies depending on a number of factors, including electricity market prices, the cost-competitiveness of the project, the presence or absence of public policies supportive of new projects, contract duration, and the perspective of different market participants. While there is no single answer to the role that RECs play, there are situations in which REC revenues are essential to project economics, as well as some where REC revenues may have little impact. To strengthen the role RECs play in both compliance and voluntary markets, there are a number of options that could be considered. In compliance markets, lawmakers or regulators would have to adopt measures that strengthen the role of RECs in the development of new projects, while in voluntary markets, it would be up to program leaders and market participants themselves to implement measures.

  3. All projects related to | Page 303 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project is a joint initiative between the University of Nairobi, Kenya, and the ... grants and related support services, including short courses, workshops and supervision of research projects. ... Program: Food, Environment, and Health.

  4. The Empty Shops Project: Developing Rural Students' Sociological Insight

    Science.gov (United States)

    Willis, Evan; Burns, Edgar

    2011-01-01

    An informal research project with high local relevance was developed for a first-year sociology course at an Australian rural university campus. The project developed students' sociological insight by challenging them to investigate "truths" about their own region, rather than immediately pushing them to comprehend new and different…

  5. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  6. Implementation of an education development project in pathology to improve student competency-lessons learnt.

    Science.gov (United States)

    Negi, Gita; Harsh, Meena; Chauhan, Vijendra D; Kalra, Vinita; Agarwal, Pradeep; Kusum, Anuradha

    2015-08-01

    Basic medical sciences and clinical teachings are not coordinated in the present medical education system. They are not taught keeping in mind the outcomes required at the time of actual handling of patients in the community. An educational development project was implemented in the Department of Pathology with the aim that it will result in the student learning to link the pathophysiology of the disease to clinical scenarios and become fully competent for lifelong medical practice. The pathology teaching of the second professional batch was modified by starting with defining the desired outcomes/competencies in the student's knowledge, skills, and attitude which were then addressed by lectures, demonstrations, practical classes and small group activities where case scenarios and laboratory reports were included. The outcome was assessed by Objectively Structured Clinical/Practical Examination and multiple choice questions. Force field analysis, faculty and student interviews, and questionnaires were used to assess the factors affecting its implementation and impact. Totally 80 students of the 2(nd) Professional MBBS were exposed to a competency-based education development project. It was found that the system was appreciated by faculty and students, especially the integration with clinical scenarios. There were many factors which influenced the execution of this program, including motivation level of students and faculty, time, logistics and meticulous planning. There was a significant improvement in student's performance and satisfaction. Many factors including prior planning were a major determinant for the success of this education development project.

  7. Evaluation of the Benefits Attributable to Automotive Lighweight Materials Program Research and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.

    2002-01-11

    The purpose of this project is to identify and test methods appropriate for estimating the benefits attributable to research and development (R and D) projects funded by the Automotive Lightweight Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The program focuses on the development and validation of advanced lightweight materials technologies to significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. The work supports the goals of the Partnership for a New Generation of Vehicles (PNGV). Up to thirty percent of the improvement required to meet the PNGV goal of tripling vehicle fuel economy and much of its cost, safety, and recyclability goal depend on the lightweight materials. Funded projects range from basic materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers.

  8. All projects related to | Page 165 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Improving Knowledge Management and Utilization of Research Results in Ecohealth Projects. Project. This study brings together lead investigators from 11 past and ongoing Ecohealth projects across Latin America who are interested in achieving better development outcomes guided by research results. End Date: August ...

  9. All projects related to | Page 535 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Aligning the National S&T Policy with the National Sustainable Development ... Project. Sri Lanka does not have an official science and technology (S&T) policy. ... Project. This action research project will study innovation in service delivery by local ... Topic: SOLID WASTES, WASTE MANAGEMENT, WASTE DISPOSAL.

  10. All projects related to | Page 31 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... Miscellaneous, Natural Resources, Science and Technology, Social Policy. Project ... Agricultural water innovations in the tropics – AgWIT. Project. This project seeks to contribute to agricultural resilience to climate change in Costa Rica and Brazil by developing more sustainable soil and water management strategies.

  11. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  12. Use of Multi-Disciplinary Projects To Develop Competence.

    Science.gov (United States)

    Trotman-Dickenson, Danusia

    1992-01-01

    Undergraduate technology and business students at the Polytechnic of Wales (United Kingdom) participated in multi-disciplinary team projects to experience real life business challenges and develop competences that employers expect in professionals. Lists characteristics of successful multi-disciplinary projects, discusses cost and industry…

  13. Metrics-based control in outsourced software development projects

    NARCIS (Netherlands)

    Ponisio, Laura; van Eck, Pascal

    2012-01-01

    Measurements have been recognised as vital instruments to improve control in outsourced software development projects. However, project managers are still struggling with the design and implementation of effective measurement programs. One reason for this is that although there is a large body of

  14. The JET Project Scientific and technical developments 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The JET (Joint European Torus) Project is fully described in EUR 5516e (EUR-JET-R5) 'The JET Project - Design Proposal'. This report describes developments in the project from the stage described in EUR 5516e until late in 1976. An introductory chapter describes the present state of the project and subsequent chapters deal in detail with the following topics: experimental programme aspects; vacuum vessel, pumping system, activation studies; toroidal field coils and mechanical structure; poloidal field system; assembly and maintenance; power supplies; control and data acquisition system; site and buildings

  15. Project Development Specification for Special Protective Coating

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the Special Protective Coating. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  16. Project Development Specification for Valve Pit Manifold

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the valve pit manifolds. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  17. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  18. Leadership Development of Rehabilitation Professionals in a Low-Resource Country: A Transformational Leadership, Project-Based Model.

    Science.gov (United States)

    Pascal, Maureen Romanow; Mann, Monika; Dunleavy, Kim; Chevan, Julia; Kirenga, Liliane; Nuhu, Assuman

    2017-01-01

    This paper presents an overview of the activities and outcomes of the Leadership Institute (LI), a short-term leadership development professional development course offered to physiotherapists in a low-resource country. Previous studies have provided examples of the benefits of such programs in medicine and nursing, but this has yet to be documented in the rehabilitation literature. The prototype of leadership development presented may provide guidance for similar trainings in other low-resource countries and offer the rehabilitation community an opportunity to build on the model to construct a research agenda around rehabilitation leadership development. The course used a constructivist approach to integrate participants' experiences, background, beliefs, and prior knowledge into the content. Transformational leadership development theory was emphasized with the generation of active learning projects, a key component of the training. Positive changes after the course included an increase in the number of community outreach activities completed by participants and increased involvement with their professional organization. Thirteen leadership projects were proposed and presented. The LI provided present and future leaders throughout Rwanda with exposure to transformative leadership concepts and offered them the opportunity to work together on projects that enhanced their profession and met the needs of underserved communities. Challenges included limited funding for physiotherapy positions allocated to hospitals in Rwanda, particularly in the rural areas. Participants experienced difficulties in carrying out leadership projects without additional funding to support them. While the emphasis on group projects to foster local advocacy and community education is highly recommended, the projects would benefit from a strong long-term mentorship program and further budgeting considerations. The LI can serve as a model to develop leadership skills and spur professional

  19. Natural gas projects in the developing world: An empirical evaluation of merits, obstacles, and risks

    Science.gov (United States)

    Mor, Amit

    Significant amounts of natural gas have been discovered in developing countries throughout the years during the course of oil exploration. The vast majority of these resources have not been utilized. Some developing countries may benefit from a carefully planned utilization of their indigenous resources, which can either be exported or used domestically to substitute imported or exportable fuels or feedstock. Governments, potential private sector investors, and financiers have been searching for strategies to promote natural gas schemes, some of which have been in the pipeline for more than two decades. The purpose of this thesis is to identify the crucial factors determining the success or failure of launching natural gas projects in the developing world. The methodology used to evaluate these questions included: (1) establishing a representative sample of natural gas projects in developing countries that were either implemented or failed to materialize during the 1980-1995 period, (2) utilizing a Probit limited dependent variable econometric model in which the explained variable is project success or failure, and (3) choosing representing indicators to reflect the assumed factors affecting project success. The study identified two conditions for project success: (1) the economic viability of the project and (2) securing financing for the investment. The factors that explain the ability or inability of the sponsors to secure financing were: (1) the volume of investment that represented the large capital costs of gas transportation, distribution, and storage, (2) the level of foreign exchange constraint in the host country, and (3) the level of development of the country. The conditions for private sector participation in natural gas projects in developing countries were identified in the study by a Probit model in which the explained variable was private sector participation. The results showed that a critical condition for private sector participation is the

  20. Growth and Project Finance in the Least Developed Countries

    DEFF Research Database (Denmark)

    la Cour, Lisbeth F.; Müller, Jennifer

    2014-01-01

    for economic growth in LDCs. We find that a higher regulatory quality, lower government consumption and a higher level of education helps increase growth. The significance of these variables are, however, not as consistently robust as the results for project finance.......This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using...... data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of financing in the selected set of countries. Additionally, the project sheds light on other factors of importance...

  1. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  2. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  3. Project management initiative local development through specialized training.

    Directory of Open Access Journals (Sweden)

    Neisy Ramos Acevedo

    2013-09-01

    Full Text Available The local development should complete a group of basic principles, such as: the design for training and the tools information adapted to the particularity of each territory. This training facilitates, also, the articulation of the stocks deployed by the local leaders, and it increases the administration of the knowledge and the transfer of technologies, processes in those that the nexuses are enlarged between the structures and the population, and where the participation of different present actors is potentialized in the territory. During the year 2010 the Ministry of Economy and Planning begins to offer the possibility to finance projects for the local development, nevertheless these initiatives should be accompanied by a rigorous study of feasibility of the investments. The University of Sancti Spíritus, committed in this zeal, designs the Diplomate of Administration of Projects for Local Initiatives, which offers theoretical tools and it develops practical abilities in the different actors of the local development that facilitate the realization of these studies. The exercise of this graduate's culmination consists on the defence of the study of feasibility of those projects that each municipality identifies as priority for its development.

  4. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  5. A LOCAL DEVELOPMENT PROJECT IN THE FRAMEWORK OF PUBLIC POLICIES FOCUSED ON REGIONAL DEVELOPMENT STRATEGIES

    Directory of Open Access Journals (Sweden)

    George Schin

    2013-12-01

    Full Text Available This paper aims at outlining a successful implementation of a project within LEADER framework, which is a local development method which allows local actors to develop an area by using its endogenous development potential. After a brief presentation of the characteristics of regional development strategies in Romania, there were emphasized the objectives and activities encompassed in a local development plan, managed by the leaders of the local action group called ‘Vrancea County’. In order to reinforce the strengths of Vrancea County and implicitly to assure a sustainable development of this area from the South-East part of Romania, a LAG constituted through a partnership between public and private actors settled a set of priorities to be exploited by means of specific actions. The goal of this paper is to highlight these priorities, by integrating them in a project management approach. The paper concludes with specifications about how Microsoft Project software could support project management initiatives that will be developed by the LAG Vrancea County in the next period.

  6. Development of the Decommissioning Project Management System, DECOMMIS

    International Nuclear Information System (INIS)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B.

    2007-03-01

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies

  7. Pre-feasibility study template for nZEB pilot projects development

    OpenAIRE

    Crespo Sánchez, Eva

    2015-01-01

    This document corresponds to Task 5.2 NZEB pilot projects development, Deliverable 5.2 Basic project conceptual design with feasibility analysis for eight pilot project of the SUSTAINCO project and should present a structure of pre-feasibility studies for eight NZEB projects implementation. It aims to give an overview of how SUSTAINCO project implementation is to be prepared and which technical and financial parameters to concern.

  8. Design and Development of a New Multi-Projection X-Ray System for Chest Imaging

    Science.gov (United States)

    Chawla, Amarpreet S.; Boyce, Sarah; Washington, Lacey; McAdams, H. Page; Samei, Ehsan

    2009-02-01

    Overlapping anatomical structures may confound the detection of abnormal pathology, including lung nodules, in conventional single-projection chest radiography. To minimize this fundamental limiting factor, a dedicated digital multi-projection system for chest imaging was recently developed at the Radiology Department of Duke University. We are reporting the design of the multi-projection imaging system and its initial performance in an ongoing clinical trial. The system is capable of acquiring multiple full-field projections of the same patient along both the horizontal and vertical axes at variable speeds and acquisition frame rates. These images acquired in rapid succession from slightly different angles about the posterior-anterior (PA) orientation can be correlated to minimize the influence of overlying anatomy. The developed system has been tested for repeatability and motion blur artifacts to investigate its robustness for clinical trials. Excellent geometrical consistency was found in the tube motion, with positional errors for clinical settings within 1%. The effect of tube-motion on the image quality measured in terms of impact on the modulation transfer function (MTF) was found to be minimal. The system was deemed clinic-ready and a clinical trial was subsequently launched. The flexibility of image acquisition built into the system provides a unique opportunity to easily modify it for different clinical applications, including tomosynthesis, correlation imaging (CI), and stereoscopic imaging.

  9. Manpower development for nuclear power programme. China. Project findings and recommendations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1992-01-01

    The United Nations Development Program (UNDP) project was conceived in April 1985, implementation was started on preliminary authorization by summer 1986, and it was approved and signed in early 1987. The duration was originally planned for three years with a UNDP input of US$ 1,657.500 (including Government cost sharing of US$ 280,000). The project is now essentially completed with a few items still pending, though committed as firmly planned, and the current cost estimate is US$ 1,707.617. The objective of the project was to assist in establishing long-term training programmes in two training centres in the People's Republic of China (Qinshan and Suzhou) and strengthen the training capabilities at these centres. The two centres are intended to provide specialized comprehensive training in basic and applied nuclear power engineering disciplines as well as in construction, operation and maintenance of nuclear power plants to technical personnel assigned to the nuclear power plants in the People's Republic of China

  10. The Development of an Instrument to Measure the Project Competences of College Students in Online Project-Based Learning

    Science.gov (United States)

    Lin, Chien-Liang

    2018-01-01

    This study sought to develop a self-report instrument to be used in the assessment of the project competences of college students engaged in online project-based learning. Three scales of the KIPSSE instrument developed for this study, namely, the knowledge integration, project skills, and self-efficacy scales, were based on related theories and…

  11. The SIMRAND methodology - Simulation of Research and Development Projects

    Science.gov (United States)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  12. Theoretical background to orient the universitary projects management to local development.

    Directory of Open Access Journals (Sweden)

    Naybi Salas Vargas

    2012-03-01

    Full Text Available Nowadays the resources administration is a problem to be solved, and is remarkable the universities role to orient knowledge to the expected local development. With the communion of the university and the main decisors at local and territorial contexts, it is evident the development of alternatives that diminish existing breaches in the known projects management Anytime the projects development context is diverse and multicultural, all the knowledge elements that provide new forms are useful experiences without point out unique recipees. The development dynamic evolution in the territories continues being an urgency for human survival.The projects management, notable in international cooperation actions as the international dimension of the extensionist activity and in the science contributions, are reduced in their foccus to the promotion of local development, what points out the need to orient the universitary processes to the territorial development of the province, in particular the projects management. The objective of this work is to offer a guidance of foundations that allow to orient the management of universtary projects to local development.

  13. METHODICAL APPROACHES TO ASSESSMENT OF EFFICIENCY OF INVESTMENT PROJECTS OF DEVELOPMENT OF RURAL TERRITORIES

    Directory of Open Access Journals (Sweden)

    Nadejda Shatsilo

    2018-05-01

    expedient to calculate the efficiency of investments taking into account the effects that are determined in the economic, social and economic subsystems of the rural territory on the basis of the use of cost and natural indicators, as well as the integral indicator, which in dynamics will be able to characterize the achieved effect of investment activity. The necessity of using integral ecological norms in the assessment of investment projects of rural development developed on the basis of the energy approach is proved. It is determined that the quantitative criterion of the degree of balance of natural and productive potentials is an indicator of the ecological technical capacity of the territory, which can be expressed by the mass of the substance standardized according to danger (toxicity and presented in energy or money terms. Scientific novelty. The mechanism of estimation of efficiency of innovative-investment project of development of rural territory is substantiated. Practical significance. Adherence to the above-mentioned principles in assessing the effectiveness of rural development investments will take into account specific features, including the potential and problems of rural areas; To formulate a strategy and priorities for the development of rural areas; Define a circle of investors and coordinate their interests with the interests of the territory; To substantiate the mechanisms of interaction and coordination between the subjects of the system; Optimize the investment process. Using the indicator of environmental technology in the evaluation of investment projects will allow forecasting further development of investment projects and develop measures to prevent degradation of the environment during their implementation. The proposed mechanism for evaluating investment projects for rural development will form the basis for the correlation of the impact of planned activities and the possibilities of the natural complex to self-reproduction without the

  14. Renewable energy projects under the clean development mechanism : myth or reality?

    International Nuclear Information System (INIS)

    Timilsina, G.

    2005-01-01

    This paper discussed the fate of Renewable Energy (RE) in Canada. The importance of RE is now increasing from both an environmental and energy security perspective, and has been projected as a key solution to climate change problems. RE is also one of the key greenhouse gas (GHG) mitigation options to be considered under the Clean Development Mechanism (CDM). Canada possesses more than 100 GW of technical potential for RE resources, including wind, solar and small hydro. Less than 10 per cent of this potential has been exploited to date. A number of programs have been developed to facilitate the deployment of Renewable Energy Technologies (RETs), including financial incentives, renewable portfolio standards and green power procurement policies. However, Canadian policies are less aggressive than those of other countries. This study showed that the supply of certified emission reductions (CERs) resulting from negative and low cost CDM options, such as energy efficiency improvements, afforestation and reforestation, could surpass the total demand for CERs during the first commitment period of the Kyoto Protocol. Implementation of RE projects under the CDM could be undermined. It was recommended that increased support of the Global Environment Facility (GEF), use of the Special Climate Change Fund, and special attention to RE from both host and investing countries should become mandatory as alternative strategies to promote RE. In addition, it should be acknowledged that the development of RETs faces a number of barriers and challenges, including competition from conventional energy technologies; lack of customer and investor confidence; regulatory and institutional barriers; and technical barriers such as transmission access. 19 refs., 1 tab

  15. Development of the Decommissioning Project Management System, DECOMMIS

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-03-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies.

  16. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  17. Developing an online professional network for veterinary education: the NOVICE project.

    Science.gov (United States)

    Baillie, Sarah; Kinnison, Tierney; Forrest, Neil; Dale, Vicki H M; Ehlers, Jan P; Koch, Michael; Mándoki, Mira; Ciobotaru, Emilia; de Groot, Esther; Boerboom, Tobias B B; van Beukelen, Peter

    2011-01-01

    An online professional network for veterinarians, veterinary students, veterinary educationalists, and ICT (Information and Communication Technology) educationalists is being developed under the EU (European Union) Lifelong Learning Programme. The network uses Web 2.0, a term used to describe the new, more interactive version of the Internet, and includes tools such as wikis, blogs, and discussion boards. Focus groups conducted with qualified and student veterinarians within the project's five founding countries (The Netherlands, Germany, United Kingdom, Hungary, Romania) demonstrated that online professional communities can be valuable for accessing information and establishing contacts. Online networks have the potential to overcome common challenges to face-to-face communities-such as distance, cost, and timing-but they have their own drawbacks, such as security and professionalism issues. The Network Of Veterinary ICt in Education (NOVICE) was developed using Elgg, an open-source, free social networking platform, after several software options had been considered. NOVICE aims to promote the understanding of Web 2.0, confidence to use social software tools, and participation in an online community. Therefore, the Web site contains help sections, Frequently Asked Questions, and access to support from ICT experts. Five months after the network's launch (and just over one year into the project) 515 members from 28 countries had registered. Further research will include analysis of a core group's activities, which will inform ongoing support for and development of informal, lifelong learning in a veterinary context.

  18. Studies and analyses of the management of scientific research and development, including implementation and application at NASA centers

    Science.gov (United States)

    Rubenstein, A. H.

    1975-01-01

    Summary results obtained through the Program of Research on the Management of Research and Development (POMRAD) were presented. The nature of the overall program and the specific projects undertaken were described. Statistical data is also given concerning the papers, publications, people, and major program areas associated with the program. The actual list of papers, names of doctoral and masters theses, and other details of the program are included as appendices.

  19. Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects; TOPICAL

    International Nuclear Information System (INIS)

    Das, S

    2001-01-01

    The purpose of this project is to identify and test methods appropriate for estimating the benefits attributable to research and development (R and D) projects funded by the Automotive Lightweight Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). Funded projects range from basic materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R and D projects were chosen for this pilot evaluation: Low-Cost, Continuous Cast Aluminum Sheet; Advanced Forming Technologies for Aluminum; and Manufacturing of Composite Automotive Structures. These projects were chosen because they represent a range of benefits evaluation situations. The first project resulted in an improved process that may be commercialized. The second project is on going and has two distinct components. The third project has yielded an improved technology that has been commercialized. This completed project also benefited from numerous complementary projects

  20. Toward an effective implementation of clean development mechanism projects in China

    International Nuclear Information System (INIS)

    Zhang Zhongxiang

    2006-01-01

    With the already huge and growing amount of greenhouse gas emissions and a great deal of low-cost abatement options available, China is widely expected as the world's number one host country of clean development mechanism (CDM) projects. But, making this potential a reality represents a significant challenge for China, because there has been a general lack of awareness by both the Chinese government and business communities, clear institutional structure, and implementation strategy. This has raised great concern about China's ability to compete internationally for CDM projects and exploit fully its CDM potential. This paper aims to address how CDM projects will be effectively implemented in China by examining the major CDM capacity building projects in China with bilateral and multilateral donors, the treatment of low-cost, non-priority CDM projects, and how a system for application, approval, and implementation of CDM projects is set up in China and what roles the main institutional actors are going to play in the system. We conclude that these capacity building assistances, the establishment of streamlined and transparent CDM procedures and sound governance, and the lessons learned and experience gained from the implementation of the CDM project in Inner Mongolia and the two Prototype Carbon Fund' projects will help China to take advantage of CDM opportunities. Moreover, in order to further capitalize on its CDM potential, there is a pressing need for the Chinese government to amend its current interim CDM regulations, in particular those controversial provisions on the eligibility to participate in CDM projects in China and the distribution of the revenues derived from CDM project between the project developer and the Chinese government. We believe that taking these capacity building projects and the recommended actions to clearly define the sustainable development objective of the CDM and disseminate CDM knowledge to local authorities and project developers as

  1. A project-based system for including farmers in the EU ETS

    DEFF Research Database (Denmark)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-01-01

    as ‘the missing link’ in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system......Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices...... for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits...

  2. ) The Application of Remote Sensing to Exploration and Production Projects in Shell Petroleum Development Company for Effective Environmental Management

    International Nuclear Information System (INIS)

    Mpaka, O.E.

    2003-01-01

    Over the years (especially within the last decade) environmental issues have assumed a proportion that the oil industry appeared unprepared for. The oil industry has not been immune from the consequences of the awareness generated by various interest groups world-wide. Environmental Assessment has become an integral part of all projects in Shell Development Company [SPDC] and the remote sensing tool has shown to be vital for effective management of the environment. The Niger Delta operations area covers approximately 70.0002km, an area including mangrove swamps, extensive forest and agricultural development, and most SPDC onshore operations are carried out in this fragile environment. Project citing in this environment requires careful planning and articulation of environmentally friendly and cost effective routes and sites. The implementation of satellite image processing and analysis, using georeferenced multispectral imagery have provided information on vegetation and other land cover types, topography including drainage, and infrastructure. The derived information is used for planning new well locations; flowlines and location access routes; impact assessment and monitoring of the environment. This article discusses how the environment is better managed by applying the remote sensing technology in each project embarked upon in SPDC. Some of he projects discussed include: Forcados CCP, Oluwa-Ore and Awoba-Soku-Bonny gasline routes/site investigation and selection projects Oben, Uzere/Oroni Field Development Planning ;3D Ovio Seismic prospect planning ;Obigbo Pipeline squatter mapping

  3. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  4. Energy research and development projects in the Nordic countries. Directory 1985. Energiforskningsprojekter i Norden. Katalog 1985

    International Nuclear Information System (INIS)

    1985-01-01

    This is the third directory of research, development and demonstration projects in the Nordic countries within the field of energy. The 1985 directory includes projects running in 1985. 1757 projects are described and all of them are financed through special public funds (i.e. external funding). The directory is published at the request of the Nordic Council of Ministers and a special Energy Research Committee set up by the Nordic energy ministers in order to coordinate and promote Nordic information sharing in the energy field. (author)

  5. Development Approach of the Advanced Life Support On-line Project Information System

    Science.gov (United States)

    Levri, Julie A.; Hogan, John A.; Morrow, Rich; Ho, Michael C.; Kaehms, Bob; Cavazzoni, Jim; Brodbeck, Christina A.; Whitaker, Dawn R.

    2005-01-01

    The Advanced Life Support (ALS) Program has recently accelerated an effort to develop an On-line Project Information System (OPIS) for research project and technology development data centralization and sharing. There has been significant advancement in the On-line Project Information System (OPIS) over the past year (Hogan et al, 2004). This paper presents the resultant OPIS development approach. OPIS is being built as an application framework consisting of an uderlying Linux/Apache/MySQL/PHP (LAMP) stack, and supporting class libraries that provides database abstraction and automatic code generation, simplifying the ongoing development and maintenance process. Such a development approach allows for quick adaptation to serve multiple Programs, although initial deployment is for an ALS module. OPIS core functionality will involve a Web-based annual solicitation of project and technology data directly from ALS Principal Investigators (PIs) through customized data collection forms. Data provided by PIs will be reviewed by a Technical Task Monitor (TTM) before posting the information to OPIS for ALS Community viewing via the Web. Such Annual Reports will be permanent, citable references within OPIS. OPlS core functionality will also include Project Home Sites, which will allow PIS to provide updated technology information to the Community in between Annual Report updates. All data will be stored in an object-oriented relational database, created in MySQL(Reistered Trademark) and located on a secure server at NASA Ames Research Center (ARC). Upon launch, OPlS can be utilized by Managers to identify research and technology development (R&TD) gaps and to assess task performance. Analysts can employ OPlS to obtain the current, comprehensive, accurate information about advanced technologies that is required to perform trade studies of various life support system options. ALS researchers and technology developers can use OPlS to achieve an improved understanding of the NASA

  6. [Anthropology and oral health projects in developing countries].

    Science.gov (United States)

    Grasveld, A E

    2016-01-01

    The mouth and teeth play an important role in social interactions around the world. The way people deal with their teeth and mouth, however, is determined culturally. When oral healthcare projects are being carried out in developing countries, differing cultural worldviews can cause misunderstandings between oral healthcare providers and their patients. The oral healthcare volunteer often has to try to understand the local assumptions about teeth and oral hygiene first, before he or she can bring about a change of behaviour, increase therapy compliance and make the oral healthcare project sustainable. Anthropology can be helpful in this respect. In 2014, in a pilot project commissioned by the Dutch Dental Care Foundation, in which oral healthcare was provided in combination with anthropological research, an oral healthcare project in Kwale (Kenia) was evaluated. The study identified 6 primary themes that indicate the most important factors influencing the oral health of school children in Kwale. Research into the local culture by oral healthcare providers would appear to be an important prerequisite to meaningful work in developing countries.

  7. Implementing Climate-Compatible Development in the Context of Power: Lessons for Encouraging Procedural Justice through Community-Based Projects

    Directory of Open Access Journals (Sweden)

    Benjamin T. Wood

    2018-05-01

    Full Text Available Climate-compatible development (CCD is being operationalised across the developing world through projects that integrate development, adaptation and mitigation using community-based approaches—community-based CCD (CB-CCD. By incorporating and considering local people’s concerns, these projects are positioned as more effective, efficient and sustainable than ‘top-down’ climate and development solutions. However, the literature pays little attention to whether and how these projects achieve procedural justice by recognising local people’s identities, cultures and values; and providing local people with meaningful participatory opportunities. We address this gap through an analysis of two donor-funded CB-CCD projects in Malawi, drawing on household surveys, semi-structured interviews and documentary materials. Our findings show that the projects had only limited success in facilitating procedural justice for the target populations. Households’ meaningful engagement in project activities and decision-making was often curtailed because power asymmetries went unchallenged. While many households were well engaged in projects, the recognition and participation of others—including many of the most vulnerable households—was limited. Building on our findings, we present a six-step approach to help CB-CCD project staff understand, manage and challenge power asymmetries; and create widespread recognition of, and meaningful participatory opportunities for, local people.

  8. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  9. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  10. Role Of Non-Governmental Organizations Leadership In The Implementation Of Community Development Projects In Arumeru District Tanzania

    Directory of Open Access Journals (Sweden)

    Rajabu Ally Mtunge

    2015-08-01

    Full Text Available The purpose of this study was to examine the role of leadership in the implementation of community development projects by local non-governmental organizations in Arumeru District Tanzania. The study applied survey design which covered the sample of 46 respondents including District Executive Director District Social Workers Non-Governmental Organization leaders workers and volunteers and community members in Arumeru district Tanzania. The study employed simple random sampling technique in order to ensure equal chance of an individual being involved in this study as inferential statistics considered. Data collected from a sample of 46 NGOs employees using a semi-structured questionnaire with both closed and open-ended questions. The collected data analyzed using both descriptive and inferential statistics. The descriptive statistical tools used included frequencies mean and standard deviation while inferential statistical tool used was correlation. Statistical Package for the Social Sciences SPSS version 19 used for analyzing the data collected. The study achieved a response of 46 out of a sample of 47 representing a response rate of 97.87. The results show that a significant number of NGOs 34.8 had not completed their projects 21.7 stated that less than five projects were complete and 43.5 of the respondents confirmed that more than five projects not completed over the last one year. Regarding the influence of leadership on implementation of project spearmans rank correlation revealed a very strong positive correlation 0.910 between of leadership vision and implementation of community development projects a strong positive correlation between communication and implementation of community development projects rho 0.730 n 46 p .001 strong positive correlation between commitment and implementation of community developmental projects which was statistically significant rs .601 p .000 and a positive correlation between accountability and

  11. Holistic Approach to Secondary Earth Science Teacher Professional Development: the Triad of Project-based Instruction, Earth Science Content, and GIS Technology

    Science.gov (United States)

    Rubino-Hare, L.; Sample, J. C.; Fredrickson, K.; Claesgens, J.; Bloom, N.; Henderson-Dahms, C.; Manone, M.

    2011-12-01

    We have provided two years of professional development for secondary and middle school teachers with a focus on project-based instruction (PBI) using GIS. The EYE-POD project (funded by NSF-ITEST) involved pairs of teachers from Arizona and the surrounding region in two-week institutes during Summer, 2010, and an advanced institute in Summer, 2011. The NAz-POD project (funded by Arizona Department of Education and administered by Science Foundation Arizona) provided similar PD experiences, but the institutes occurred during weekends in the academic year. The institutes were led by a team with expertise in Earth science content, professional development and pedagogy, and GIS. The teachers developed learning modules using the project based learning instructional model. Pedagogy, content, and GIS skills were combined throughout the professional development activities. Academic year follow up by NAU personnel included classroom observations and technical support. For assessing student work we provided a rubric, but learned that teachers were not prepared to assess GIS products in order to determine the level of student understanding. In year two of the project we incorporated strategies for assessment of student products into the professional development. Teacher-participants and their students completed several pre- and post- assessments. Teacher assessments included a geospatial performance assessment, classroom observations, and content tests. Student data collection included attitude and efficacy questionnaires, content tests, and authentic assessments including products using GIS. Content tests were the same for teachers and students and included spatial reasoning, data analysis, and Earth science content. Data was also collected on teacher perception of professional development delivery and self-reported confidence in teaching with PBI and geospatial technology. Student assessments show that improvement occurred in all areas on the content test. Possible factors

  12. Design for sustainability: Countering the drivers of unsustainability in development projects

    CSIR Research Space (South Africa)

    Marais, Mario A

    2015-11-01

    Full Text Available The vast majority of development projects, and in particular Information and Communications Technology for Development (ICT4D) projects, fail to reach their objectives and only a small number of projects effect change that lasts... of the beneficiary system, and to meet the system at the current point in its development path. It may call for the development of modular interventions, parts of which can be rolled out as and when the system is ready for the adoption thereof. Is Current Change...

  13. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  14. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  15. MODELS OF AND APPROACHES TO MANAGEMENT OF REAL ESTATE DEVELOPMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2012-12-01

    Full Text Available The authors argue that globalization and the system-wide crisis jointly produce a strong impact onto real estate (RE development projects. As a result, intensive alterations in RE project development patterns have converted into a new trend of the present-day investment and construction industry. Therefore, alterations in the area of real estate management cause numerous problems. By virtue of this article, the authors make an attempt to provide their answer to the question whether it is possible to achieve such a sophisticated level of project management in the real estate development industry, so that project-related decisions encompassed supplementary potential opportunities in terms of social, economic and public development. Towards this end, the new concept of real estate development is proposed and the system of priorities has been developed. This concept is believed to enable all players of the construction market to make higher quality decisions at early stages of RE development projects. Besides, a lot of attention is driven to the term "potential of a construction facility", that is regarded as a set of yet unimplemented opportunities for improvements of the construction facility performance as a commercial and social vehicle.

  16. Great Plains Wind Energy Transmission Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task

  17. An Empirical Study of Capability Development within Product Innovation Projects

    Directory of Open Access Journals (Sweden)

    Alireza Javanmardi Kashan

    2015-04-01

    Full Text Available The objective of this paper is to develop insights into firms’ strategic capability development processes within product innovation projects. In particular, the research aims at investigating the interactions among product innovation, knowledge processes, and capability development within firms. Building on qualitative data from the auto-industry, our analysis reveals that across four product innovation projects, the case company developed architectural knowledge and capability. Findings reveal that, along with changes at each level of product architecture, “design knowledge” and “design capability” have been developed at the same level of product architecture, leading to capability development at that level. Furthermore, findings suggest that such capability transformation resulting from knowledge and capability creation over the course of case projects leads to modularization of product architecture. Overall, the research contributes to identifying and emphasizing the role of micro processes in capability development and renewal, which in turn enhances our understanding of strategic capability development processes.

  18. methanization of organic matters. Guide for project developers

    International Nuclear Information System (INIS)

    2015-02-01

    This document aims at informing potential project developers (farmers, local communities, industrials) all along the creation of a methanization unit. It precisely indicates administrative procedures required to complete a project. It first presents some generalities about methanization (matters and their performance, methanization cycle, biogas), describes methanization processes (dry and humid), and valorisation processes (co-generation, hot water production, gas injection into the public network), presents digestate characteristics, and discusses benefits and drawbacks of methanization. The different steps of a project management are then analysed. Additional procedures are indicated, and risks and traps of methanization projects are highlighted. The document comes along with a large number of appendices which can be documents released by professional or public bodies

  19. Sustainable energy for cashew production chain using innovative clean technology project developments

    Energy Technology Data Exchange (ETDEWEB)

    Pannir Selvam, P.V.; Nandenha, Julio; Santiago, Brunno Henrique de Souza; Silva, Rosalia Tatiane da [Universidade Federal do Rio Grande do Norte (GPEC/DEQ/UFRN), Lagoa Nova, RN (Brazil). Dept. de Engenharia Quimica. Grupo de Pesquisa em Engenharia de Custos e Processos], e-mail: pannirbr@gmail.com

    2006-07-01

    The main objective is to develop a new process synthesis based on the residual biomass waste for the energy production applied to the fruit processing plant with co-production of hot, cold thermal energy using biogas from the wood biomass and animal wastes. After carried out the bibliographical research about the current state of art technology, an engineering project had been developed with the use of the software Super Pro Designer V 4.9. Some simulations of processes of the fast pyrolysis, gasification, bio digestion, generation of energy have been realized including the system integration of energy production as innovation of the present work. Three cases study have been developed: first, the current process of conventional energy using combustion, another one using combined pyrolysis and gasification, and the last one with bio digestion for combined power, heat and chilling. The results about the project investment and the cost analysis, economic viability and cash balance were obtained using software Orc 2004. Several techno-economic parameters of the selected cases study involving process innovation were obtained and compared, where a better energy and materials utilization were observed in relation to conventional process. This project which is still in development phase, involves small scale energy integrated system design. The energy and the process integration cashew fruit production chain, based on the clean technology process design, has enable significant improvement in terms of economic and environmental using optimal system configurations with viability and sustainability. (author)

  20. All projects related to | Page 118 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Strengthening the Evidence Base for Open Government in Developing Countries. Project. The Open Government Partnership (OGP) is an ... Project. Despite growing philanthropy in emerging economies, there are significant data gaps on amounts and sources. Topic: POLICY MAKING, REGULATIONS, HUMANITARIAN ...

  1. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  2. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  3. Externally Funded Research and ‎Development ‎‎Projects in Perspective of Learning

    Directory of Open Access Journals (Sweden)

    Rauno Ilmari Pirinen

    2011-10-01

    Full Text Available The focus of this study is on stunted-centered learning activity ‎which ‎collaborates ‎learning ‎and research in an interoperative ‎way ‎and shares the regional-national ‎research ‎and development ‎‎(R&D capabilities, interests and agenda.‎ The study is addressed ‎to ‎the cooperation model and factors of learning within R&D ‎projects that develop ‎academic knowledge, competences and ‎regional—national capabilities for all ‎participants by ‎contributing ‎authentic R&D scopes or problems in real-life ‎situations. The study includes analysis of the ‎research data regarding ‎the R&D project, namely SATERISK (SATEllite ‎positioning ‎‎RISKs, which was initiated by two security ‎management students at Laurea University of ‎Applied ‎Sciences ‎and that has evolved into a substantial three-year R&D ‎project ‎between 2008 and 2011 and is funded by the ‎Finnish ‎Funding Agency for ‎Technology and Innovations (TEKES.‎

  4. Future development of project management competences.

    NARCIS (Netherlands)

    Silvius, A.J.G.; Batenburg, R.

    2009-01-01

    This paper describes a study into the expected development of the competences of the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  5. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  6. Laguna Verde: a 120% extended power up-rate project developed by Iberdrola

    International Nuclear Information System (INIS)

    Merino Teillet, A.; Garcia-Serrano Tapia, J. L.; Ruiz Gutierrez, L.

    2010-01-01

    The experience which this document wants to present, describes the work being developed by IBERDROLA Ingenieria y Construccion, for the Laguna Verde plant in Mexico, owned by the Federal Electricity Commission (CFE). This generation plant consists of two light boiling water type units (BWR) design by General Electric in the 80's. The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Up-rate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power, whilst upgrading and renovating plant equipment and installations to achieve a license renewal from 40 to 60 years of operation The consortium formed in 97% by IBERDROLA Ingenieria y Construccion SAU and in 3% by ALSTOM Mexicana, S.A. de CV, was awarded the contract in an international bid, competing against General Electric and Siemens. The project began in March 2007 and is scheduled to finalize in December 2010. At this point the work carried out include modifications of the main condenser replacement, moisture separator reheaters (MSR's) and feedwater heaters no. 5 and 6 in the two units, therefore having executed two out of four scheduled outages. The scope, development and organization of this project, whose basic elements include the design, engineering, training, supply of equipment, dismantling, installation, testing, commissioning, treatment and delivery of radioactive waste generated during the project implementation to CFE, is aimed to ensure a safe and reliable operation of the plant under the new conditions of increased thermal power of the reactor, with a thermal cycle optimized so that the gross power of the generator increase from the current 686.7 MWe to a value of 817.1 MWe in both units. An Extended Power Up-rate means an opportunity to modernize equipments, to improve maintenance, to get a better plant knowledge and to motivate the employees facing a challenging project. This project, being the

  7. Development of a Laboratory Project to Determine Human ABO Genotypes--Limitations Lead to Further Student Explorations

    Science.gov (United States)

    Salerno, Theresa A.

    2009-01-01

    A multiplex allele-specific PCR analysis was developed to identify six "common" genotypes: AA, AO, BB, BO, OO, and AB. This project included a pre-laboratory exercise that provided active learning experiences and developed critical thinking skills. This laboratory resulted in many successful analyses, which were verified by student knowledge of…

  8. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  9. INFLUENCES ON ORGANISATIONAL SLACK IN NEW PRODUCT DEVELOPMENT PROJECTS

    OpenAIRE

    ANDERS RICHTNÉR; PÄR ÅHLSTRÖM

    2006-01-01

    Programs to decrease cost and to increase operational efficiency may reduce a company's ability to innovate, by reducing organisational slack. Previous research on the relationship between organisational slack and innovation has been at level of the firm and has neglected the processes underlying the relationship, which takes place at the level of product development projects. In this paper, we identify organisational slack and its influences at the level of the product development project. T...

  10. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  11. Developing a Mathematical Model for Scheduling and Determining Success Probability of Research Projects Considering Complex-Fuzzy Networks

    Directory of Open Access Journals (Sweden)

    Gholamreza Norouzi

    2015-01-01

    Full Text Available In project management context, time management is one of the most important factors affecting project success. This paper proposes a new method to solve research project scheduling problems (RPSP containing Fuzzy Graphical Evaluation and Review Technique (FGERT networks. Through the deliverables of this method, a proper estimation of project completion time (PCT and success probability can be achieved. So algorithms were developed to cover all features of the problem based on three main parameters “duration, occurrence probability, and success probability.” These developed algorithms were known as PR-FGERT (Parallel and Reversible-Fuzzy GERT networks. The main provided framework includes simplifying the network of project and taking regular steps to determine PCT and success probability. Simplifications include (1 equivalent making of parallel and series branches in fuzzy network considering the concepts of probabilistic nodes, (2 equivalent making of delay or reversible-to-itself branches and impact of changing the parameters of time and probability based on removing related branches, (3 equivalent making of simple and complex loops, and (4 an algorithm that was provided to resolve no-loop fuzzy network, after equivalent making. Finally, the performance of models was compared with existing methods. The results showed proper and real performance of models in comparison with existing methods.

  12. USAID Anticorruption Projects Database

    Data.gov (United States)

    US Agency for International Development — The Anticorruption Projects Database (Database) includes information about USAID projects with anticorruption interventions implemented worldwide between 2007 and...

  13. Valuing and timing R and D using a real options pricing framework; including an application to the development of Lunar Helium-3 fusion

    International Nuclear Information System (INIS)

    Ott, S.H.

    1992-01-01

    This dissertation uses the real options framework to study the valuation and optimal investment policies for R and D projects. The models developed integrate and extend the literature by taking into account the unique characteristics of such projects including uncertain investment in R and D, time-to-build, and multiple investment opportunities. The models were developed to examine the optimal R and D investment policy for the Lunar Helium-3 fusion project but have general applicability. Models are development which model R and D investment as an information gathering process where R and D investment remaining changes as investment is expended. The value of the project increased as the variance of required investment increases. An extension of this model combines a stochastic benefit with stochastic investment. Both the value of the R and D project and the region prescribing continued investment increased. The policy implications are significant: When uncertainty of R and D investment is ignored, the value of the project is underestimated and a tendency toward underinvestment in R and D will result; the existence of uncertainty in R and D investment will cause R and D projects to experience larger declines in value before discontinuation of investment. The model combining stochastic investment with the stochastic benefit is applied to the Lunar Helium-3 fusion project. Investment in fusion should continue at the maximum level of $1 billion annually given current levels of costs of alternative fuels and the perceived uncertainty of R and D investment in the project. A model is developed to examine the valuation and optimal split of funding between R and D projects when there are two competing new technologies. Without interaction between research expenditures and benefits across technologies, the optimal investment strategy is to invest in one or the other technology or neither. The multiple technology model is applied to analyze competing R and D projects, namely

  14. Overview of ITER project. Objective, history, status of development, structure and its future

    International Nuclear Information System (INIS)

    Matsuda, S.

    2003-01-01

    The objective of ITER Project is to demonstrate the scientific and technological feasibility of fusion energy for peaceful use. To achieve this goal, the Conceptual Design Activities (CDA 1988-1990) and the Engineering Design Activities (EDA 1992-2001) were conducted by the joint effort of EU, Japan, RF and US under the auspices of IAEA. Engineering design has been developed consistently with plasma physics databases obtained by the world-wide magnetic fusion devices up to and during the EDA. Technology R and D including development, manufacturing and testing of scalable models of major components have been also conducted and ensured manufacturing and technical feasibility of ITER. Such technical readiness to start ITER construction urged formal government negotiation initially by Canada, EU, Japan and RF, and intense meetings have been held since November 2001. The US and China have joined since Feb. 2003. Four candidate sites have been proposed by Canada, EU and Japan for construction and have been evaluated. Once the agreement will be made, the construction takes about 10 years to complete, followed by the operation and exploitation phase lasting about 20 years. This paper gives an overview of ITER Project including its role in the long range fusion program, history, status of development, collaboration structure and its future program. (author)

  15. Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates

    Science.gov (United States)

    Cianfrani, C. M.

    2009-12-01

    Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates Christina M. Cianfrani Assistant Professor, School of Natural Science, Hampshire College, 893 West Avenue, Amherst, MA 01002 Sustainable water resources and low impact development principles are taught to first-year undergraduate students using an applied design project sited on campus. All students at Hampshire College are required to take at least one natural science course during their first year as part of their liberal arts education. This requirement is often met with resistance from non-science students. However, ‘sustainability’ has shown to be a popular topic on campus and ‘Sustainable Water Resources’ typically attracts ~25 students (a large class size for Hampshire College). Five second- or third-year students are accepted in the class as advanced students and serve as project leaders. The first-year students often enter the class with only basic high school science background. The class begins with an introduction to global water resources issues to provide a broad perspective. The students then analyze water budgets, both on a watershed basis and a personal daily-use basis. The students form groups of 4 to complete their semester project. Lectures on low impact design principles are combined with group work sessions for the second half of the semester. Students tour the physical site located across the street from campus and begin their project with a site analysis including soils, landcover and topography. They then develop a building plan and identify preventative and mitigative measures for dealing with stormwater. Each group completes TR-55 stormwater calculations for their design (pre- and post-development) to show the state regulations for quantity will be met with their design. Finally, they present their projects to the class and prepare a formal written report. The students have produced a wide variety of creative

  16. The Financing of Media Projects for Development.

    Science.gov (United States)

    Spain, Peter L.

    1978-01-01

    Discusses the financing of Third World media projects that are designed for development, and reports on five main sources of funding--government sources, international agencies, advertising sales, private local support, and self-support. (Author/JEG)

  17. The formation of a risk management system for projects in the field of aquaculture innovative development in the Kaliningrad region: a case study

    Directory of Open Access Journals (Sweden)

    Serbulov Alexey

    2012-03-01

    Full Text Available This article sets out to develop the concept and the principal scheme of the formation of a risk management system for innovative economic development projects in the field of aquaculture. The research carried out by the authors helps identify the main problems and characteristics of risk management projects for the development of aquaculture in presentday Russia. The authors outline the status and features of aquaculture development projects in the North-western federal district and the Kaliningrad region. The article formulates and justifies the concept of “risk management projects in innovative development of aquaculture in the region” focusing on the classification of aquaculture risks in relation to innovative development projects, which expands the conceptual framework of risk management in view of the specific risks relating to economic development projects in the field of aquaculture. The authors characterize modern methods and approaches to risk management projects and organizations in the context of their application in the framework of aquaculture development projects and offer mechanisms for risk management of aquaculture development projects, which make it possible to include risk management activity in the general context of activities of parent project organizations. The authors develop the concept and principal scheme of the formation of risk management system for innovative development projects in aquaculture.

  18. Sustainable development in city districts: BaLaLuZ project - Business

    International Nuclear Information System (INIS)

    Inderbitzin, J.

    2004-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This paper takes a look at business aspects in the four districts and examines the factors that influence the sustainable development of these districts. The functioning of each of the four districts in relation to their parent cities is discussed both in historical and present-day contexts. Economic aspects and the possibilities for future development are discussed, as are sustainability factors. The criteria for the four districts are compared. The influence expected with respect to projects in the four areas is discussed

  19. Impact of National Fadama Development Project II on Rice farmers ...

    African Journals Online (AJOL)

    ... examined the impact of National Fadama Development Project II on the profitability of rice farmers and assessed the extent to which the various innovations disseminated by the project were adopted by the rice farmer beneficiaries. The project which had all operating expenses cofinanced by the various key stakeholders ...

  20. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  1. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    Science.gov (United States)

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  2. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    Directory of Open Access Journals (Sweden)

    Christos Antonopoulos

    2016-06-01

    Full Text Available In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes, and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  3. Faculty development projects for international health professions educators: Vehicles for institutional change?

    Science.gov (United States)

    Burdick, William P; Friedman, Stacey R; Diserens, Deborah

    2012-01-01

    Projects are an important tool in faculty development, and project emphasis may offer insights into perceived education priorities. Impact of projects has been focused on individuals, not institutions or health. Education innovation projects of Fellows in an international faculty development program were examined to better understand perceived needs in health professions education and institutional impact of projects. Four hundred and thirty-five projects were analyzed to identify focus areas. Fellows were asked to identify changes in their schools and communities resulting from their projects. New education methods and curriculum change were common project focus areas. Regional differences were evident with a higher percentage of education methods projects by Fellows residing in India (52%), compared with South Africa (25%) and Brazil (24%). Fifty-six percent of projects were incorporated into the curriculum and/or incorporated as institutional policy. One-third to two-thirds of respondents noted improved teaching quality, collaboration, education research interest, assessment, student performance, and curriculum alignment with community health needs. National differences in project focus may offer insight into local conditions and needs. High rates of diffusion of projects and impact on faculty, students, and curriculum suggest that faculty development projects may be a strategy for institutional change in resource limited environments.

  4. Development of a website and an information system for an European R&D project : the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2003-01-01

    Full Text Available The multidisciplinary nature, the international partnership and the large amount of information to be managed in an European project such as STRATFEED, require the development of an information management system. Within the framework of this project, the development of the Internet-oriented computer system required three facets: the data and information collection, the database building and the development of different applications. A tool for the dissemination of results (STRATFEED website with both a public part and a confidential part, a tool for data management (STRATFEED manager, a tool for data queries (STRATFEED explorer and two tools for decision-making (ARIES Decision Support System –– CD-Rom release and STRATFEED Decision Support System – Internet release were developed. The modular concept, which relates to the different topics of the project, facilitates the updating and development of a system according to research progress and user needs. The concept developed for this project can be used for any other project and can easily be adapted to meet new requirements. The example of the STRATFEED project can be accessed at: http://stratfeed.cra.wallonie.be

  5. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    Directory of Open Access Journals (Sweden)

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  6. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  7. Entrepreneurship skills development through project-based activity in Bachelor of Pharmacy program.

    Science.gov (United States)

    Shahiwala, Aliasgar

    2017-07-01

    To provide pharmacy students with an opportunity to develop entrepreneurial thinking and skills. A business proposal building project-based activity was integrated into a two-credit hour pharmacy management course during the eighth semester of the bachelor of pharmacy degree program. The student groups submitted their proposals, mimicking the process of submitting business proposals and obtaining approval in the real world. Essential management tasks including operation procedures, location and layout design, inventory management, personnel management, marketing management, and finance management were taught step-by-step so that students could work on a similar scenario with their proposal building. Students' career preferences were also measured at the beginning and end of the course. Course was assessed by written exffigam and rubric based project evaluation. Student feedbacks of the project were collected using a five-point Likert scale. The project-based activity was well integrated in the course. The project helped the students (n=72) to understand management concepts more clearly, which was reflected by their significantly higher (pproject was successfully designed and executed in a pharmacy management course within a bachelor of pharmacy curriculum. Based on the response received in this project, efforts will be made to provide guidance and support to the students by calling field experts such as pharmacy owners and financiers. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. A Process Towards Societal Value within a Community-Based Regional Development Project

    Directory of Open Access Journals (Sweden)

    Anna Åslund

    2012-12-01

    Full Text Available Processes, activities and tasks of a community-based area development project are described. The main process has been used three times and a model is presented. An earlier developed process map has been verified. The description of the project can help other communities to plan development projects. The illustration can be valuable for entrepreneurs who are planning a societal value initiative and for decision-makers and stakeholders who can contribute to, are concerned with, or may be affected by societal entrepreneurship. Observation, participating studies, dokumentations and an interview with the project leader has been carried out. Data have been analyzed and compared with the previously developed process map to achieve a deeper understanding of the processes within societal entrepreneurship. The purpose was to study and describe the processes of a community-based area development project and to compare it with a previously developed process map and to verify the process map.

  9. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  10. Personalised nutritional powder for elderly developed in OPTIFEL European Project

    Directory of Open Access Journals (Sweden)

    Monica TRIF

    2016-11-01

    Developing innovative food and services tailored to elderly populations is a new challenge for key players involved in food industry and catering. The population targeted by the OPTIFEL project is elderly cooking at home or making use of meal-on-wheels services for whom the project will develop food products adapted to their taste, habits, needs and constraints.

  11. All projects related to | Page 209 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Project. Known for its dense human population, diverse wild animal species, and large population of domestic animals, Sri Lanka derives both risks and benefits from its wildlife. ... The Arab Council for the Social Sciences: Support for Institutional Development, Core Capacities, and an Inaugural Research Program. Project.

  12. All projects related to | Page 321 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Total Funding: CA$ 1,500,000.00. Universities and Councils Network on Innovation for Inclusive Development in Southeast Asia. Project. The recently completed IDRC-supported project, 104904 Science and Technology Innovation for the Base of the Pyramid (Southeast Asia), supported research on pro-poor innovations in ...

  13. Project Oasis : A Case Study in Jamaican Development Administration

    NARCIS (Netherlands)

    Gayle, Dennis J.; Drori, Israel D.

    1984-01-01

    This paper is concerned with development administration in practice, at the level of a particular project which was implemented in the Caribbean island of Jamaica in 1979. We are essentially concerned with the problem of the degree of fit between operational project objectives and the management of

  14. All projects related to | Page 25 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Bolivian public justice performance research study. Project. The Bolivian justice system obtains a conviction in less than 0. Topic: Gender ... Making trade work for small producers in Southeast Asia's least developed countries. Project. Low-income economies depend greatly on agriculture, and growth in this sector ...

  15. Economic Development Impacts of Community Wind Projects. A Review and Empirical Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2009-04-01

    "Community wind" refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an "absentee" project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  16. MARKETING STRATEGIES IN THE DEVELOPMENT AND IMPLEMENTATION OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-05-01

    Full Text Available The article is devoted to marketing in project management, as the scope of activities aimed at improving the quality characteristics of the project for its further effective market promotion in an increasingly competitive environment. Particular attention is paid to marketing strategies during the development and subsequent sale of the project to the investor. The problem of effective combination of marketing strategies and project management process is being solved.

  17. Cooperation and communication challenges in small-scale eHealth development projects.

    Science.gov (United States)

    Petersen, Lone Stub; Bertelsen, Pernille; Bjørnes, Charlotte

    2013-12-01

    In eHealth development there is an increasing focus on user participation inspired by the information systems field of practice and research. There are, however, many other challenges in developing information systems that fit healthcare practices. One of these is the challenge of cooperation and communication in development projects that are initiated and managed by clinicians e.g. cooperating with IT professionals in 'bottom up' health informatics projects that have been initiated and are managed by healthcare professional project managers. The analysis and results are drawn from a qualitative case study on a systems development project that was managed by a local, non-technical, healthcare professional and the complex blend and interactions with the IT professionals in the phases of ideas, design, development, implementation, maintenance and distribution. We analyze the challenges of cooperation and communication using perspectives from information systems research and the concepts of 'language-games' and 'shared design spaces', and thereby exploring the boundaries between the different communication, practice and culture of the IT professionals and the healthcare professionals. There is a need to (a) develop a better understanding of the development process from the point of view of the 'user' and (b) tools for making technical knowledge explicit in the development process. Cooperative and communicative methods are needed that support and develop the shared design spaces between IT professionals and the clinical context in order to strengthen small-scale health information systems projects. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  18. A role for NGOs in international renewable energy project development

    Energy Technology Data Exchange (ETDEWEB)

    Bartholf, T.R.

    1997-12-01

    An NGO is an international term for non-government organizations, often it is used in connection with non-profit, community-based and/or voluntary business activities. To be successful in supporting energy projects, these organizations generally exhibit certain characteristics: they are familiar with the end-use requirements; they are typically neutral to the technology; they emphasize training; they do not carry a large bureacratic structure, at home or in the field; they typically can adapt to do numerous functions; they can often attract other support. The author discusses several examples of such organizations who have been highly successful. The author sees a continuing role for such groups in developing renewable energy sources in the rural setting to include: continued development of new activity in rural areas; development of institutional framework for future market activity; an increased role in managing international development activities; more direct involvement with for-profit technical and financial organizations.

  19. Decision making and risk analysis during the development of wind energy projects

    International Nuclear Information System (INIS)

    Vanhaesebroeck, M.

    2004-11-01

    This study aims at determining a methodology or criteria which can be used as decision making tools for the development of wind power projects and for the objective profitability comparison between several projects. In the first part, the different steps of the development of a wind power project in France are described. For each step, the cost of the studies, the related approaches and the main risks of abandonment are precised. The potential time drifts in the planning of the project are identified on the basis of the experience feedback of the first years of wind power development in France. In the second part, the possibilities of using classical investment choice techniques are analyzed. The characteristics having more impact on the project profitability are identified. In the third part, the sequential models with increasing information are used to evaluate a project, whatever its level of development. Finally, a concrete case is considered to see how these models can be used as decision making tools during key steps of wind farms development. (J.S.)

  20. Explaining the differential distribution of Clean Development Mechanism projects across host countries

    International Nuclear Information System (INIS)

    Winkelman, Andrew G.; Moore, Michael R.

    2011-01-01

    The Clean Development Mechanism (CDM) of the Kyoto Protocol represents an opportunity to involve all developing countries in the effort to reduce greenhouse gas emissions while also promoting sustainable development. To date, however, the majority of CDM projects have gone to emerging markets such as China, India, Brazil, and Mexico, while very few least developed countries have hosted projects. This paper investigates the differential distribution of CDM activities across countries. We develop a conceptual model for project profitability, which helps to identify potential country-level determinants of CDM activity. These potential determinants are employed as explanatory variables in regression analysis to explain the actual distribution of projects. Human capital and greenhouse gas emission levels influenced which countries have hosted projects and the amount of certified emission reductions (CER) created. Countries that offered growing markets for CDM co-products, such as electricity, were more likely to be CDM hosts, while economies with higher carbon intensity levels had greater CER production. These findings work against the least developed countries and help to explain their lack of CDM activity. - Research Highlights: → Regression models are used to explain the inter-country distribution of CDM projects. → Emissions and human capital are significant for hosting projects and CER creation. → An economy's emissions intensity is significant in determining CERs created. → Capacity building and electricity sector growth are significant in hosting projects. → The experience level for host countries in the CDM is significant for CER creation.

  1. Project Morpheus: Lean Development of a Terrestrial Flight Testbed for Maturing NASA Lander Technologies

    Science.gov (United States)

    Devolites, Jennifer L.; Olansen, Jon B.

    2015-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a Liquid Oxygen (LOX)/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. In 2012, Morpheus began integrating the Autonomous Landing and Hazard Avoidance Technology (ALHAT) sensors and software onto the vehicle in order to demonstrate safe, autonomous landing and hazard avoidance. From the beginning, one of goals for the Morpheus Project was to streamline agency processes and practices. The Morpheus project accepted a challenge to tailor the traditional NASA systems engineering approach in a way that would be appropriate for a lower cost, rapid prototype engineering effort, but retain the essence of the guiding principles. This paper describes the tailored project life cycle and systems engineering approach for the Morpheus project, including the processes, tools, and amount of rigor employed over the project's multiple lifecycles since the project began in fiscal year (FY) 2011.

  2. CDM. Information and guidebook - Developed for the UNEP project 'CD4CDM'[Clean development nedianism

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.K. (ed.)

    2003-12-01

    Since the Clean Development Mechanism (CDM) was defined at Conference of the Parties 3 in Kyoto 1997, it took the international community another 4 years to reach the Marrakesh Accords in which the modalities and procedures to implement the CDM was elaborated. Even if more detailed rules, procedures and modalities have to be further developed a general framework to implement the CDM and other Kyoto mechanisms are now in place. This guidebook is produced to support the UNEP project 'Capacity Development for the Clean Development Mechanism'. Focus is on the CDM project cycle, the Project Design Document (PDD), and related issues such as sustainable development goals, financing and market intelligence. The appendices present frequently asked questions and answers, a short overview of existing guidelines and a possible future list of eligible CDM projects categories. (BA)

  3. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  4. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  5. Regional hydrogen roadmap. Project development framework for the Sahara Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Benhamou, Khalid [Sahara Wind Inc., Rabat (Morocco); Arbaoui, Abdelaziz [Ecole National Superieure des Arts et Metiers ENSAM Meknes (Morocco); Loudiyi, Khalid [Al Akhawayn Univ. (Morocco); Ould Mustapha, Sidi Mohamed [Nouakchott Univ. (Mauritania). Faculte des Sciences et Techniques

    2010-07-01

    The trade winds that blow along the Atlantic coast from Morocco to Senegal represent one of the the largest and most productive wind potentials available on earth. Because of the erratic nature of winds however, wind electricity cannot be integrated locally on any significant scale, unless mechanisms are developed for storing these intermittent renewable energies. Developing distributed wind energy solutions feeding into smaller electricity markets are essential for solving energy access issues and enabling the development of a local, viable renewable energy industry. These may be critical to address the region's economic challenges currently under pressure from Sub-Saharan migrant populations. Windelectrolysis for the production of hydrogen can be used in grid stabilization, as power storage, fuel or chemical feedstock in specific industries. The objective of the NATO SfP 'Sahara Trade Winds to Hydrogen' project is to support the region's universities through an applied research framework in partnership with industries where electrolysis applications are relevant. By powering two university campuses in Morocco and Mauritania with small grid connected wind turbines and 30 kW electrolyzers generating hydrogen for power back-up as part of ''green campus concepts'' we demonstrated that wind-electrolysis for the production of hydrogen could absorb larger quantities of cheap generated wind electricity in order to maximize renewable energy uptakes within the regions weaker grid infrastructures. Creating synergies with local industries to tap into a widely available renewable energy source opens new possibilities for end users such as utilities or mining industries when processing raw minerals, whose exports generates key incomes in regions most exposed to desertification and climate change issue. Initiated by Sahara Wind Inc. a company from the private sector, along with the Al Akhawayn University, the Ecole Nationale Superieure

  6. Texas LPG fuel cell development and demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units

  7. A reanalysis of a behavioral intervention to prevent incident HIV infections: Including indirect effects in modeling outcomes of Project EXPLORE

    Science.gov (United States)

    Eaton, Lisa A.; Kalichman, Seth C.; Kenny, David A.; Harel, Ofer

    2013-01-01

    Background Project EXPLORE -- a large-scale, behavioral intervention tested among men who have sex with men (MSM) at-risk for HIV infection --was generally deemed as ineffective in reducing HIV incidence. Using novel and more precise data analytic techniques we reanalyzed Project EXPLORE by including both direct and indirect paths of intervention effects. Methods Data from 4,296 HIV negative MSM who participated in Project EXPLORE, which included ten sessions of behavioral risk reduction counseling completed from 1999-2005, were included in the analysis. We reanalyzed the data to include parameters that estimate the overtime effects of the intervention on unprotected anal sex and the over-time effects of the intervention on HIV status mediated by unprotected anal sex simultaneously in a single model. Results We found the indirect effect of intervention on HIV infection through unprotected anal sex to be statistically significant up through 12 months post-intervention, OR=.83, 95% CI=.72-.95. Furthermore, the intervention significantly reduced unprotected anal sex up through 18 months post-intervention, OR=.79, 95% CI=.63-.99. Discussion Our results reveal effects not tested in the original model that offer new insight into the effectiveness of a behavioral intervention for reducing HIV incidence. Project EXPLORE demonstrated that when tested against an evidence-based, effective control condition can result in reductions in rates of HIV acquisition at one year follow-up. Findings highlight the critical role of addressing behavioral risk reduction counseling in HIV prevention. PMID:23245226

  8. Development of Entrepreneurship Competences from Project Based Learning Approaches

    Directory of Open Access Journals (Sweden)

    Lidia SÁNCHEZ GONZÁLEZ

    2017-02-01

    Full Text Available A key issue for any educational institution is to train individuals in such a way that they participate efficiently in their context. The current context where learning is carried out is digital era. With this landscape, and taking into account the current socioeconomic situation, it is necessary to increase students’ employability. This requires that what is taught in educational institutions fits with companies’ requirements. In this sense one of most common companies’ requirement is that students have knowledge about how to develop a project from scratch. In order to address this issue, the present paper poses the application of a project based learning methodology. This methodology is applied in an experiment that comprises two academic years. During each year, the students should develop complete projects working as teams and obtain final products. In this way, it was possible to develop competences that can be interesting for companies and also to increment students’ motivation.

  9. Developing Communities of Practice around e-Learning and Project Management

    Science.gov (United States)

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  10. 76 FR 9346 - Sun City Project LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2857-000] Sun City Project LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Sun City...

  11. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  12. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  13. All projects related to | Page 131 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Any -, Development, Economics, Environment, Evaluation, Food and Agriculture, Gender ... This project seeks to provide capacity-building support to develop and ... Topic: Climate change, ENVIRONMENTAL MANAGEMENT, POLICY MAKING, ... Inclusive Development and Chinese Foreign Direct Investment in the Greater ...

  14. Time for Decarbonization of Conservation and Development Projects? The Political Ecology of Carbon Projects

    Directory of Open Access Journals (Sweden)

    Pierre L. Ibisch

    2015-01-01

    Full Text Available The globe's first carbon projects were designed and implemented approximately 20 years ago following scientific insights that emissions of greenhouse gases needed to be mitigated. Visible in some of these early projects were the important aspects of social governance and local benefit sharing. The projects promised to be a panacea to environmental, social and economic problems in remote rural areas of developing countries. However, it took another decade before a wave of hundreds of carbon projects were launched. Many of the projects were offered under the mechanism of REDD+ (Reducing Emissions from Deforestation and forest Degradation, plus the role of conservation, sustainable forest management and carbon enhancement, as well as under a variety of voluntary schemes and national programs, public-private partnerships, and forestry-based investment initiatives. As decision-makers prepare the Conference of the Parties of the United Nations Framework Convention on Climatic Change in Paris (COP21, Earthscan has released a book entitled `Carbon conflicts and forest landscapes in Africa', edited by Melissa Leach and Ian Scoones. According to the editors, the focus of the book is on what happens on the ground when carbon forestry projects arrive, what types of projects work, and, equally important, what doesn’t work.

  15. Open Crowdsourcing: Leveraging Community Software Developers for IT Projects

    Science.gov (United States)

    Phair, Derek

    2012-01-01

    This qualitative exploratory single-case study was designed to examine and understand the use of volunteer community participants as software developers and other project related roles, such as testers, in completing a web-based application project by a non-profit organization. This study analyzed the strategic decision to engage crowd…

  16. The development of today's mineable oil sands projects, the key factors influencing economics

    International Nuclear Information System (INIS)

    Lynn, J.R.

    1991-01-01

    Many factors influence the perception of economic performance for developing projects. Some of these factors can be controlled by the developer, while some are outside the developer's sphere of influence. Technology selection, management systems, stakeholder involvement, environmental responsiveness and risk management are areas that may be influenced, however interest rates, product prices and currency exchange all have a measurable effect on project economics and are beyond a developer's control. Economic considerations for evaluating mineable oil sand development projects are outlined, focussing on the key factors unique to such developments in general and to the OSLO project in particular. The OSLO project is a proposed $5 billion energy development that entails constructing an open pit oil sands mine and a bitumen extraction facility north of Fort McMurray, Alberta, coupled with a bitumen upgrader in the Redwater area. 7 figs

  17. A project-based system for including farmers in the EU ETS.

    Science.gov (United States)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-04-01

    Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices as 'the missing link' in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits corresponding to the amount of reduction which can be stored for later use or sold in the EU ETS. Copyright © 2010 Elsevier Ltd. All rights reserved.

  18. Kikori River basin project to sustain environment alongside development

    International Nuclear Information System (INIS)

    Price, J.B.; Power, A.P.; Henry, D.

    1994-01-01

    Protecting people and the environment is an essential design and operational criteria for the Kutubu Petroleum Development Project to minimize the physical, social and economic impacts on the local people and their environment in Papua New Guinea. This paper describes how Kutubu was implemented, and how World Wildlife Fund is assisting the neighboring communities to utilize their natural resources for long term benefit. The objectives and first year expectations of a three year integrated conservation and development project are identified, and the progress is summarized

  19. Rock stress measurements. Preparatory stage of the equipment development project

    International Nuclear Information System (INIS)

    Mononen, S.; Hakala, M.; Mikkola, P.

    2002-01-01

    In recent years the rock stress measurement methods used in Finland have been overcoring and hydraulic fracturing. There have been mainly two companies involved in these measurements, namely Suomen Malmi Oy (Smoy) and SwedPower AB. Smoy has done measurements for mines and for rock engineering projects, whereas SwedPower AB has mainly been involved in nuclear waste disposal investigations and conducted hydraulic fracturing measurements in deep boreholes. Smoy together with its partners started in February 2001 a project named JTM, which was a preliminary stage for a future project, which aims to develop a device most suitable for rock stress measurements in Finland. The partners in the project were HUT Rock Engineering, Posiva Oy, Saanio and Riekkola Oy, Gridpoint Finland Oy and Geopros Oy. Tekes, the National Technology Agency, provided almost half of the project funding. In the management group of the project were Pekka Mikkola (chairman) and Tero Laurila from Smoy, Pekka Saerkkae and Sakari Mononen (full-time researcher) from HUT, Aimo Hautojaervi (Posiva Oy), Erik Johansson (Saanio and Riekkola Oy), Matti Hakala (Gridpoint Finland Oy) and Heikki Haemaelaeinen (Geopros Oy). The aim of the JTM-project was to find out the needs for the development of a device most suitable for rock stress measurements in Finnish mines and rock engineering projects. During the project work was done to find out the range of rock stress measurement devices available, to find out the needs for measurements, and to get acquainted to the measurements done in Scandinavia. Also a report of the most suitable methods for Finnish rock conditions was done based on literature and on interviews of rock stress experts. Based on all the information collected during the project a clear picture of the needs for rock stress measurements in Finland could be formed and a preliminary plan of a future project was done. The aim of the suggested project is to build a device based on hydraulic fracturing

  20. Automating the management of software projects in a developing it ...

    African Journals Online (AJOL)

    Software project management is the control of the transformation of users' ... Model from The American Systems Corporation (ASC) was used for risk management. ... Multi-site development approach facilitates large projects by using simple ...

  1. Coordinating Management Activities in Distributed Software Development Projects

    OpenAIRE

    Bendeck, Fawsy; Goldmann, Sigrid; Holz, Harald; Kötting, Boris

    1999-01-01

    Coordinating distributed processes, especially engineering and software design processes, has been a research topic for some time now. Several approaches have been published that aim at coordinating large projects in general, and large software development processes in specific. However, most of these approaches focus on the technical part of the design process and omit management activities like planning and scheduling the project, or monitoring it during execution. In this paper, we focus o...

  2. Organizational and Functional Modeling of Business Processes for Management of the Development Project Efficiency

    OpenAIRE

    Soboleva Elena

    2017-01-01

    The article is devoted to development project management issues in the current economic situation in Russia, to the construction industry, to the problems of development projects implementation in Russia and to the impact of the quality of projects in the construction industry, to assessment of the impact of external project environment on the effectiveness of project activities in crisis, as well as to project management quality. A methodological approach to qualitative management of develop...

  3. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  4. Complex New Product Development projects - How the Project Manager’s Information Sharing With Core Actors Changes Over Time

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde

    2013-01-01

    A heavily burdened project manager must ensure effective information sharing with actors inside and outside the organization because this is a necessary condition for a new product development (NPD) project to achieve its objectives. Knowledge, however, on who actually assists a project manager...... with the information sharing during NPD projects is limited; therefore, this study of longitudinal objective email data (4658 emails) during a NPD project contributes to theory and practice by advancing our understanding of when and how the project manager establishes relationships with different core actors inside...

  5. Purposeful Development: Being Ready When Your Project Moves From ‘Hobby’ to Mission Critical

    Directory of Open Access Journals (Sweden)

    Terry Reese

    2012-02-01

    Full Text Available Throughout the library community examples can be found of development projects evolving into mission critical components within an organization's workflow. How these projects make that move is unique and varied, but little discussion has been had about how these projects impact their developers and the project community. What responsibilities does a developer have to ensure the long-term viability of their project? Does simply freeing the code meet those long-term responsibilities, or is there an implied commitment to provide long-term "care and feeding" to project communities built up over time? Code4Lib represents a group of developers consistently looking to build the next big thing, I'd like to step back and look at some of my own experiences related to the long-term impacts that come with developing successful projects and communities, and try to provide library developers food for thought as they consider their own ongoing responsibilities to their projects and user communities.

  6. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order to accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.

  7. Development and Validation of a Project Package for Junior Secondary School Basic Science

    Science.gov (United States)

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  8. The Plasma Hearth Process Technology Development Project

    International Nuclear Information System (INIS)

    Geimer, R.; Batdorf, J.; Wolfe, P.

    1993-01-01

    The US DOE Office of Technology Development (OTD) is currently evaluating the Plasma Hearth Process (PHP) for potential treatment of several DOE waste types. The PHP is a high-temperature vitrification process that has potential application for a wide range of mixed waste types in both the low-level and transuranic mixed waste categories. The PHP is being tested under both the OTD Mixed Waste Integrated Program and the Buried Waste Integrated Demonstration. Initial testing has been completed on several different surrogate waste forms that are representative of some of the DOE mixed waste streams. Destruction of organic material exceeds that of conventional incineration technologies. The vitrified residual has leaching characteristics comparable to glass formulations produced in the high-level waste program. The first phase of the PHP demonstration project has been successfully completed, and the project is currently beginning a comprehensive second phase of development and testing

  9. Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.

    2003-01-23

    This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamental materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal

  10. Energy secretary's priorities include San Francisco area research projects

    CERN Multimedia

    Widener, A

    2003-01-01

    "Bay Area research labs got a big boost Monday when the Secretary of Energy unveiled his priorities for major research projects his agency hopes to fund over the next two decades. Among the agency's 28 top priorities are a major computer expansion and an experiment examining the expanding universe that could be housed at Lawrence Berkeley Lab and a powerful X-ray laser planned for the Stanford Linear Accelerator Center" (1 page).

  11. Development perspectives of alternative energy projects before the new energy regulation

    International Nuclear Information System (INIS)

    Valencia V; Jaime A; Perez O, Jaime A; Moreno O, German

    2000-01-01

    Large electric energy generation systems are dominant in the energy markets. This has been like that, because the economic balances have not included yet some parameters, and specifically environmental variables, that started being considered in the international markets. Colombian generation and transmission expanding plans are commented and the possibilities for the developing of alternative energy projects are referred to those plans. Additionally, a regional experience in the definition of criteria for electric energy service coverage enlargement allowing for alternative energy inclusion is presents, remarking their successful application as a competitive alternative for rural energizing

  12. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  13. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and

  14. Café seminars in a bottom-up organizational development project at a Danish radiology department

    DEFF Research Database (Denmark)

    Niss, Karsten Ulrik

    2010-01-01

    Participatory design includes engaging in large-scale information-systems development where participatory design approaches have been applied throughout design and organizational implementation. The keynote suggest to extend the iterative prototyping approach by (1) emphasizing participatory design...... and development into a sustained and ongoing implementation that constitutes an overall technology-driven organizational change. This sustained participatory design and implementation approach is exemplified through a large-scale project in the Danish healthcare sector...

  15. Defining project scenarios for the agile requirements engineering product-line development questionnaire

    OpenAIRE

    Feng, Kunwu; Lempert, Meli; Tang, Yan; Tian, Kun; Cooper, Kendra M.L.; Franch Gutiérrez, Javier

    2007-01-01

    Current agile methods are focused on practices of small, rapid developing and iteration, more people oriented, less documentation projects, and the use of the methods in large, product line projects are somehow difficult. UTD and GESSI have started a project to develop an expert system that can assist a requirements enginer in selecting a requirements engineering process that is well suited for their project, in particular with respect to the use of agile and product line engineering methods....

  16. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  17. Materials Development Program: Ceramic Technology Project bibliography, 1984--1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

  18. Energy Storage Project

    Science.gov (United States)

    Mercer, Carolyn R.; Jankovsky, Amy L.; Reid, Concha M.; Miller, Thomas B.; Hoberecht, Mark A.

    2011-01-01

    NASA's Exploration Technology Development Program funded the Energy Storage Project to develop battery and fuel cell technology to meet the expected energy storage needs of the Constellation Program for human exploration. Technology needs were determined by architecture studies and risk assessments conducted by the Constellation Program, focused on a mission for a long-duration lunar outpost. Critical energy storage needs were identified as batteries for EVA suits, surface mobility systems, and a lander ascent stage; fuel cells for the lander and mobility systems; and a regenerative fuel cell for surface power. To address these needs, the Energy Storage Project developed advanced lithium-ion battery technology, targeting cell-level safety and very high specific energy and energy density. Key accomplishments include the development of silicon composite anodes, lithiated-mixed-metal-oxide cathodes, low-flammability electrolytes, and cell-incorporated safety devices that promise to substantially improve battery performance while providing a high level of safety. The project also developed "non-flow-through" proton-exchange-membrane fuel cell stacks. The primary advantage of this technology set is the reduction of ancillary parts in the balance-of-plant--fewer pumps, separators and related components should result in fewer failure modes and hence a higher probability of achieving very reliable operation, and reduced parasitic power losses enable smaller reactant tanks and therefore systems with lower mass and volume. Key accomplishments include the fabrication and testing of several robust, small-scale nonflow-through fuel cell stacks that have demonstrated proof-of-concept. This report summarizes the project s goals, objectives, technical accomplishments, and risk assessments. A bibliography spanning the life of the project is also included.

  19. Private Sector-led Urban Development Projects. Management, Partnerships and Effects in the Netherlands and the UK

    Directory of Open Access Journals (Sweden)

    Erwin Heurkens

    2012-09-01

    development projects, and our view of management as any type of direct influencing, results in constructing a conceptual public-private urban management model (see Figure SUM.1. This model is based on both theoretical concepts and empirical reflection. In this research, the management of project processes by public and private actors contains applying both management activities and instruments. Project management (Wijnen et al., 2004 includes development stage-oriented initiating, designing, planning, and operating activities. Process management (Teisman, 2003 includes interaction-oriented negotiating, decision-making, and communicating activities. Management tools consist of legal-oriented shaping, regulating, stimulating, and capacity building planning tools (Adams et al., 2004. And management resources consist of crucial necessities (Burie, 1978 for realizing urban projects like land, capital and knowledge. In essence, all these management measures can be applied by public and private actors to influence (private sector-led urban development projects. These management measures can be used by actors to reach project effects. In this research, project effects are perceived as judgment criteria for indicating the success of the management of private sector-led urban development projects. They consist of cooperation effectiveness, process efficiency, and spatial quality. Effectiveness involves the degree to which objectives are achieved and problems are resolved. Ef ficiency is the degree to which the process is considered as efficiently realizing projects within time and budget. Finally, spatial quality is the degree to which the project contributes to responding to user, experience and future values of involved actors (Hooijmeijer et al., 2001. Such process and product effects are a crucial addition to understand the results of private sector-led urban development projects. Comparative case study research using a lesson-drawing method This research systematically analyzes

  20. Energy research and development projects in the Nordic countries. Directory 1986. Energiforskningsprojekter i Norden. Katalog 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This is the fourth directory of research, development and demonstration projects in the Nordic countries within the field of energy. The 1986 directory includes projects running in 1986. 2172 projects are described and all of them are financed through special public funds (i.e. external funding). The energy research organisation in each Nordic country is briefly reviewed in the appendixes, and a list of relevant newsletters are given. The directory is published at the request if the Nordic Council of Ministers and a special Energy Reseach Committee set up by the Nordic energy ministers in order to coordinate and promote Nordic information sharing in the energy field. (author)

  1. Developing innovative training protocol for export personnel in the fashion industries through “Extro Skills” project

    Science.gov (United States)

    Ursache, M.; Avădanei, M. L.; Ciobanu, L.; Loghin, M. C.; Ionesi, D. S.; Loghin, E.

    2017-10-01

    The paper presents the objectives, the planned outputs and the innovative aspects of the project entitled “Developing new skills for the extroversion specializations of fashion industry in Europe”, acronym EXTRO SKILLS, which is co-financed by the European Commission under the Erasmus+ Programme, Key Action 2 - Strategic Partnerships. This is a 30 months project and started on December 1-st, 2015. The project aims to bridge the gap between fashion industries and lack of specific expertise and experts of SMEs in these industries. Fashion industries require a more qualified workforce and, therefore, the availability of adequately skilled workers and trained and qualified personnel for their export and fashion marketing departments has become one of the major issues. The new curricula that will be developed in the project will offer essential transversal skills for a quick and qualified response to the international trade and market demands and for enhancing the extroversion and the competitiveness of the fashion industry. The learning content will be tailored to the needs of export and fashion marketing personnel. The constitution of the partnership was based on the cooperation between education and employment in order to better achieve the objectives of the project. The project consortium includes six partners from five countries (Greece, Belgium, Romania, Spain and UK).

  2. The Halden Reactor Project workshop meeting on control room development

    International Nuclear Information System (INIS)

    Miberg, Ann Britt; Green, Marie; Haukenes, Hanne; Larsen, Marit; Seim, Lars Aage; Veland, Oeystein

    1999-03-01

    The 'Control Room Development' workshop was organised in. Halden, November 5-6, 1998. The purpose of the workshop was to bring forward recommendations for the future use of HAMMLAB with respect to control room development. The workshop comprised thirteen presentations summarising current issues and status in control room development projects and related projects. Following the presentations, five working groups were formed. The purpose of the working groups was to establish a set of recommendations for the future use of HAMMLAB. Each working group developed a set of recommendations. The outcomes of the working groups' discussions were summarised in plenum by the working group chairs. During the workshop, all participants excluding the Halden Project staff were asked to fill in a questionnaire indicating which research topics they found most interesting to pursue in future HAMMLAB research. The purpose of this report is to summarise the workshop participants' presentations, the working groups' discussions, and the recommendations given by the workshop participants concerning the future use of HAMMLAB (author) (ml)

  3. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  4. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  5. All projects related to Algeria | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Developing and piloting business models to achieve impact at scale with mechanized forage processing in Tunisia. Project ... Topic: Gender. Region: Tunisia ... Topic: BRAIN, MATERNAL AND CHILD HEALTH, CANCER, THERAPY, CANADA.

  6. The Ikhil Gas Project: developing the first commercial natural gas project north of the Arctic Circle

    Energy Technology Data Exchange (ETDEWEB)

    Malin, G. [AltaGas Services Inc., AB (Canada)

    2001-07-01

    Development of the Ikhil Natural Gas Project by the Inuvialuit Petroleum Corporation in partnership with Enbridge and AltaGas Services are described in a step-by-step fashion. A minimum of 11 Bcf of recoverable natural gas reserves have been established to date. The Northwest Territories Power Corporation is committed under a 15-year take-or-pay contract to take the gas, and the Town of Inuvik also has a franchise agreement with the project owners for a 15-year period. Challenges faced and overcome in adapting to the regulatory process, the engineering problems that required special solutions (e.g. ice/snow roads, gravel pad to support wellhead and production facilities, reducing temperature of gas to avoid disturbing the permafrost, sand-padding pipeline to supplement high ice/content material), converting a diesel town to a natural gas town, and installing an underground distribution system in ground that is constantly shifting due to permafrost, are some of the examples discussed. Benefits accruing to local people and businesses during construction and the production phases of the project are described, along with details of an assessment and discussion of lessons learned after two years of operation. Overall, the project is considered to have been an engineering success. Financially, it is too early to judge, but it is expected that with economic development in Inuvik taking off, demand for natural gas and electricity will develop and justify the confidence of the developers.

  7. Renewable Energy Project Development Assistance (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  8. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  9. A Grant Project to Initiate School Counselors' Development of a Multi-Tiered System of Supports Based on Social-Emotional Data

    Science.gov (United States)

    Harrington, Karen; Griffith, Catherine; Gray, Katharine; Greenspan, Scott

    2016-01-01

    This article provides an overview of a grant project designed to create a district-wide elementary school counseling program with a strong data-based decision-making process. Project goals included building data literacy skills among school counselors and developing the infrastructure to efficiently collect important social-emotional indicators…

  10. Analysis of projects development of enterprises in engineering industries in Khmelnytskyi region

    OpenAIRE

    SHKODA M.S.

    2012-01-01

    This article analyzes the use of development projects in the engineering industry of Khmelnitsky region. The current state of engineering field. Solves warehouse development projects engineering enterprises and activities to enhance their implementation.

  11. Coal-fired MHD combustor development project: Phase 3D

    Science.gov (United States)

    1985-05-01

    This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase 3D) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.

  12. Applying Cultural Project Based Learning to Develop Students’ Academic Writing

    Directory of Open Access Journals (Sweden)

    Lulus Irawati

    2015-06-01

    Full Text Available Writing is considered to be the most demanding and difficult skill for many college students, since there are some steps to be followed such as prewriting, drafting, editing, revising and publishing. The interesting topic like culture including lifestyle, costume, and custom is necessary to be offered in Academic Writing class. Accordingly, this article aims to elaborate the application of a cultural project based learning to develop students’ ability in academic writing. This descriptive qualitative research was conducted in Academic Writing class consisting of 20 students of the fourth semester. The students were divided into some groups, each consisting of 4-5 people assigned to make a cultural project within 6 weeks, in the form of essay. Each member of the groups has to create his/ her own essay and then compile the essays to be a mini-journal. Therefore, one group has one mini-journal consisting of 4-5 essays. To check the content of mini-journal, the lecturer also asked the groups to present in front of the class to get some suggestions, feedback, or comments.

  13. The Impact of the Project K Youth Development Program on Self-Efficacy: A Randomized Controlled Trial.

    Science.gov (United States)

    Deane, Kelsey L; Harré, Niki; Moore, Julie; Courtney, Matthew G R

    2017-03-01

    A key issue for youth development programs is whether the learning they provide is transferred to participants' daily lives. It is also important that they are effective for the diverse range of participants they attract. This study used a randomized controlled trial design to measure the impact of Project K, a New Zealand-based youth development program, on academic and social self-efficacy. Project K combines a 3-week wilderness adventure, a 10 day community service component, and 1 year of mentoring to promote positive growth in 14-15 year olds with low self-efficacy. At baseline, the evaluation included 600 Project K (46 % female) and 577 Control participants (48 % female) and revealed that Project K was effective in improving both social and academic self-efficacy from pre- to post-program with effects being sustained 1 year later. Parents' perceptions of changes in the participants' interpersonal skills supported these findings. Differential program effects were found across participant subgroups, particularly 1 year after program completion. The implications of these differences are discussed.

  14. Constraints To Effective Community Development Projects Among ...

    African Journals Online (AJOL)

    The study focused on the perceived constraints to effective community development projects among rural households in Calabar agricultural zone of Cross River State, Nigeria. Data were collected with the aid of structured questionnaire from 104 randomly selected respondents in the study area. Data analysis was by the ...

  15. Developing Critical Thinking through Student Consulting Projects

    Science.gov (United States)

    Canziani, Bonnie; Tullar, William L.

    2017-01-01

    The authors present survey results from faculty at 44 universities on the role of student consulting projects in developing business students' critical thinking. They conclude that students can improve critical thinking by engaging in guided primary and secondary research to inform their business assumptions that underpin business planning and…

  16. Successes and challenges of north-south partnerships - key lessons from the African/Asian Regional Capacity Development projects.

    Science.gov (United States)

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Increasing efforts are being made globally on capacity building. North-south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north-south and south-south partnerships that evolved during the project were the main achievement. However, others found there to be a 'north-south divide' in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner institutions. Some challenges were underestimated

  17. Project of Atomic Energy Technology Record

    International Nuclear Information System (INIS)

    Song, K. C.; Ko, Y. C.; Kwon, K. C.

    2012-12-01

    Project of the Atomic Energy Technology Record is the project that summarizes and records whole process, from the background to the performance, of each category in all fields of nuclear science technology which have been researched and developed at KAERI. This project includes development of Data And Documents Advanced at KAERI. This project includes development of Data And Documents Advanced Management System(DADAMS) to collect, organize and preserve various records occurred in each research and development process. In addition, it means the whole records related to nuclear science technology for the past, present and future. This report summarizes research contents and results of 'Project of Atomic Energy Technology Record'. Section 2 summarizes the theoretical background, the current status of records management in KAERI and the overview of this project. And Section 3 to 6 summarize contents and results performed in this project. Section 3 is about the process of sectoral technology record, Section 4 summarizes the process of Information Strategy Master Plan(ISMP), Section 5 summarizes the development of Data And Documents Advanced Management System(DADAMS) and Section 6 summarizes the process of collecting, organizing and digitalizing of records

  18. How does technological regime affect performance of technology development projects?

    NARCIS (Netherlands)

    Song, Michael; Hooshangi, Soheil; Zhao, Y. Lisa; Halman, Johannes I.M.

    2014-01-01

    In this study, we examine how technological regime affects the performance of technology development projects (i.e., project quality, sales, and profit). Technological regime is defined as the set of attributes of a technological environment where the innovative activities of firms take place.

  19. All projects related to | Page 129 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2017-10-17

    Project. Over the past two decades, the Greater Mekong Subregion has become increasingly integrated. End Date: October 17, 2017. Topic: FOREIGN INVESTMENT, ASIA, INDUSTRIAL DEVELOPMENT, ECONOMIC DEVELOPMENT. Region: Cambodia, China, Laos, Viet Nam, Thailand. Program: Employment and Growth.

  20. Dynamics and structure of project performers of the «Federal target program for research and development in priority areas of development of the Russian scientific and technological complex for 2014–2020»

    Directory of Open Access Journals (Sweden)

    I. N. Chernova

    2017-01-01

    Full Text Available The article considers socio-demographic issues of research and development of the «Federal Target Program for Research and Development in Priority Areas of Development of the Russian Scientific and Technological Complex for 2014–2020». Analysis based on project's documents in the Program from 2014 to 2016. We studied the dynamics in both quantitative and qualitative characteristics of project performers – applied research and experimental development, and defined trends of project R&D personnel changes, including sociodemographic characteristics: age, size and composition of performers, the proportion of researchers with academic degree, and the proportion of women-researchers. In the article it is shown that specialists under 40 years of age are the largest part of project performers. The renewal of project personnel in time of projects is 65 percent. In the article it is also shown a strong correlation between project academic personnel and academic personnel of Russia as a whole. We devised proposals for tracking quantitative and qualitative parameters of project performers and for securing growth the skill level of young specialists in projects.

  1. Economic Development Impacts of Community Wind Projects: A Review and Empirical Evaluation; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Tegen, S.

    2009-04-01

    'Community wind' refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an 'absentee' project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  2. Evaluation system of Research and Development projects and services from ININ

    International Nuclear Information System (INIS)

    Reglero, R.

    1994-01-01

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author)

  3. The profitability of photovoltaic projects in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Covell, Philip W.; Hansen, Richard D. [Enersol Associates, Inc., (United states)

    1995-12-31

    This paper shows that it is possible to recover costs and profit from photovoltaic projects, even in relatively poor countries. It explains three basic financial arrangements for full cost recovery used in several developing countries for solar home and business systems: self financing; term financing through equipment vendors, banks and non-governmental organizations, and leasing. It also describes potential sources of cost recovery (besides the end-users), including CO{sub 2} offsets. Finally, it concludes that given the success of some projects, recent efforts toward market conditioning, and the effect of environmental concerns, there are good PV business opportunities for electric power utilities in developing countries. This is an adapted and abbreviated version of a paper entitled Full Cost Recovery in Photovoltaic Projects: Debunking the Myths about Equipment Subsidization. Much of the information has been drawn from the field experiences of Enersol Associates, Inc., a nonprofit organization specializing in PV project implementation; and SOLUZ, Inc., a Massachusetts based company affiliated with Industria Electrica Bella Vista, which operates a PV System Leasing Business in the Dominican Republic. Together, these organizations have facilitated the installation of over 5000 systems on a full cost recovery basis. [Espanol] Este articulo muestra que es posible recuperar los costos y sacar provecho de los proyectos fotovoltaicos, aun en paises relativamente pobres. Explica tres arreglos financieros basicos para la recuperacion total de los gastos usados en varios paises en desarrollo para sistemas solares domesticos y de negocios: autofinanciamiento, financiamiento por un periodo dado a traves de los vendedores de equipo, bancos y organizaciones no gubernamentales y renta. Tambien describe fuentes potenciales para la recuperacion de costos (ademas de los usuarios finales), incluyendo las compensaciones por CO{sub 2}. Finalmente concluye que dado el exito de

  4. The profitability of photovoltaic projects in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Covell, Philip W; Hansen, Richard D [Enersol Associates, Inc., (United states)

    1996-12-31

    This paper shows that it is possible to recover costs and profit from photovoltaic projects, even in relatively poor countries. It explains three basic financial arrangements for full cost recovery used in several developing countries for solar home and business systems: self financing; term financing through equipment vendors, banks and non-governmental organizations, and leasing. It also describes potential sources of cost recovery (besides the end-users), including CO{sub 2} offsets. Finally, it concludes that given the success of some projects, recent efforts toward market conditioning, and the effect of environmental concerns, there are good PV business opportunities for electric power utilities in developing countries. This is an adapted and abbreviated version of a paper entitled Full Cost Recovery in Photovoltaic Projects: Debunking the Myths about Equipment Subsidization. Much of the information has been drawn from the field experiences of Enersol Associates, Inc., a nonprofit organization specializing in PV project implementation; and SOLUZ, Inc., a Massachusetts based company affiliated with Industria Electrica Bella Vista, which operates a PV System Leasing Business in the Dominican Republic. Together, these organizations have facilitated the installation of over 5000 systems on a full cost recovery basis. [Espanol] Este articulo muestra que es posible recuperar los costos y sacar provecho de los proyectos fotovoltaicos, aun en paises relativamente pobres. Explica tres arreglos financieros basicos para la recuperacion total de los gastos usados en varios paises en desarrollo para sistemas solares domesticos y de negocios: autofinanciamiento, financiamiento por un periodo dado a traves de los vendedores de equipo, bancos y organizaciones no gubernamentales y renta. Tambien describe fuentes potenciales para la recuperacion de costos (ademas de los usuarios finales), incluyendo las compensaciones por CO{sub 2}. Finalmente concluye que dado el exito de

  5. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  6. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  7. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Energy Technology Data Exchange (ETDEWEB)

    Brower, Richard [Boston U.; Christ, Norman [Columbia U.; DeTar, Carleton [Utah U.; Edwards, Robert [Jefferson Lab; Mackenzie, Paul [Fermilab

    2017-10-30

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  8. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Science.gov (United States)

    Brower, Richard; Christ, Norman; DeTar, Carleton; Edwards, Robert; Mackenzie, Paul

    2018-03-01

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  9. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Directory of Open Access Journals (Sweden)

    Brower Richard

    2018-01-01

    Full Text Available In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020’s. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  10. NASA Ames DEVELOP Interns: Helping the Western United States Manage Natural Resources One Project at a Time

    Science.gov (United States)

    Justice, Erin; Newcomer, Michelle

    2010-01-01

    The western half of the United States is made up of a number of diverse ecosystems ranging from arid desert to coastal wetlands and rugged forests. Every summer for the past 7 years students ranging from high school to graduate level gather at NASA Ames Research Center (ARC) as part of the DEVELOP Internship Program. Under the guidance of Jay Skiles [Ames Research Center (ARC) - Ames DEVELOP Manager] and Cindy Schmidt [ARC/San Jose State University Ames DEVELOP Coordinator] they work as a team on projects exploring topics including: invasive species, carbon flux, wetland restoration, air quality monitoring, storm visualizations, and forest fires. The study areas for these projects have been in Washington, Utah, Oregon, Nevada, Hawaii, Alaska and California. Interns combine data from NASA and partner satellites with models and in situ measurements to complete prototype projects demonstrating how NASA data and resources can help communities tackle their Earth Science related problems.

  11. Science teachers' meaning-making when involved in a school-based professional development project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    2012-01-01

    A group of teachers’ meaning-making when they are collaboratively analyzing artifacts from practice in local science classrooms in a school-based professional development (PD) project is examined through repeated interviews and represented as meaning-making maps. The interpretation of the teachers......’ meaningmaking includes both their reference to outcomes from the project and their expressed ideas about teaching and learning of science. All four teachers refer to experiences from experimenting in their classrooms and interpret the collected artifacts in relation to students’ learning. Furthermore, they all...... felt encouraged to continue collaboration around science. During the interviews, the teachers emphasize various elements apparently connected to concrete challenges they each experience in their professional work. Implications in relation to the design of PD are discussed....

  12. Science teachers' meaning-making when involved in a school-based professional development project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    2012-01-01

    A group of teachers' meaning-making when they are collaboratively analyzing artifacts from practice in local science classrooms in a school-based professional development (PD) project is examined through repeated interviews and represented as meaning-makig maps. The interpretation of the teachers......' meaning-making includes both their reference to outcomes from the project and their expressed ideas about teaching and learning of science. All four teachers refer to experiences from experimenting in their classrooms and interpret the collected artifacts in relation to students' learning. Furthermore......, they all felt encouraged to continue collaboration around science. During the interviews, the teachers emphasize various elements apparently connected to concrete challenges they each experience in their professional work. Implications in relation to the design of PD are discussed....

  13. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  14. All projects related to Tanzania | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2018-03-21

    DataHack for financial inclusion: Creating a platform for young innovators to develop their ideas and take them to scale. Project ... Region: Argentina, Bangladesh, Cambodia, Colombia, Ghana, Guatemala, India, ... End Date: March 21, 2018.

  15. View all projects | IDRC - International Development Research Centre

    International Development Research Centre (IDRC) Digital Library (Canada)

    Education is a pillar of development. ... How can information and technology increase economic opportunities in the ... This project aims to strengthen the accountability and legitimacy of public institutions, improve public services, and fuel ...

  16. All projects related to Brazil | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    All projects related to Brazil ... Cellular senescence is a programmed response to oncogenic (tumour-causing) stress that aims to halt the expansion of cells ... Tackling online inequality: Making digital platforms work for inclusive development.

  17. The success of international development projects, trust and communication: an African perspective

    Energy Technology Data Exchange (ETDEWEB)

    Diallo, A.; Thuillier, D. [Universite du Quebec a Montreal (Canada). Dept. Management et Technologie

    2005-04-01

    Project success is strongly linked to communication and cooperation between stakeholders. This research explores the relationship between trust and communication and tests the influence of these factors upon project success and success criteria for international development projects financed by multilateral institutions in sub-Saharan Africa. The research analyses the coordinators' perceptions of project success, communication climate and interpersonal relationship between himself and his stakeholders (task manager in the multilateral agency, national supervisor) and within the project team. Data were collected from questionnaires completed by project coordinators of development projects. The statistical analysis confirms that trust and communication between players are proxy variables. Trust between the task manager and the coordinator is the key success factor, whereas team cohesion is the second most important factor. Trust between the coordinator and his national supervisor does not play a prominent role, although the task manager considers significant local autonomy for the coordinator a prerequisite for funding a subsequent phase when the project comes to an end. (author)

  18. All projects related to | Page 8 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Improving early childhood development and well-being in refugee and other marginalized countries. Project. Early childhood development research has traditionally focused on single-intervention initiatives and non-refugee populations. Region: Kenya, Bangladesh, India, Canada, South Africa, Pakistan. Program: Maternal ...

  19. Stakeholder preferences towards the sustainable development of CDM projects: Lessons from biomass (rice husk) CDM project in Thailand

    International Nuclear Information System (INIS)

    Parnphumeesup, Piya; Kerr, Sandy A.

    2011-01-01

    This research applies both quantitative and qualitative methods to investigate stakeholder preferences towards sustainable development (SD) priorities in Clean Development Mechanism (CDM) projects. The CDM's contribution to SD is explored in the context of a biomass (rice husk) case study conducted in Thailand. Quantitative analysis ranks increasing the usage of renewable energy as the highest priority, followed by employment and technology transfer. Air pollution (dust) is ranked as the most important problem. Preference weights expressed by experts and local resident are statistically different in the cases of: employment generation; emission reductions; dust; waste disposal; and noise. Qualitative results, suggest that rice husk CDM projects contribute significantly to SD in terms of employment generation, an increase in usage of renewable energy, and transfer of knowledge. However, rice husk biomass projects create a potential negative impact on air quality. In order to ensure the environmental sustainability of CDM projects, stakeholders suggest that Thailand should cancel an Environmental Impact Assessment (EIA) exemption for CDM projects with an installed capacity below 10 MW and apply it to all CDM projects. - Highlights: → Stakeholders rank increasing the usage of renewable energy as the highest priority. → Biomass (rice husk) CDM projects create a potential negative impact on air quality. → Rice husk CDM projects cannot give an extra income to farmers. → Preference weights expressed by experts and local residents are statistically different.

  20. Greenhouse Emission Reductions and Natural Gas Vehicles: A Resource Guide on Technology Options and Project Development

    Energy Technology Data Exchange (ETDEWEB)

    Orestes Anastasia; NAncy Checklick; Vivianne Couts; Julie Doherty; Jette Findsen; Laura Gehlin; Josh Radoff

    2002-09-01

    Accurate and verifiable emission reductions are a function of the degree of transparency and stringency of the protocols employed in documenting project- or program-associated emissions reductions. The purpose of this guide is to provide a background for law and policy makers, urban planners, and project developers working with the many Greenhouse Gas (GHG) emission reduction programs throughout the world to quantify and/or evaluate the GHG impacts of Natural Gas Vehicle (NGVs). In order to evaluate the GHG benefits and/or penalties of NGV projects, it is necessary to first gain a fundamental understanding of the technology employed and the operating characteristics of these vehicles, especially with regard to the manner in which they compare to similar conventional gasoline or diesel vehicles. Therefore, the first two sections of this paper explain the basic technology and functionality of NGVs, but focus on evaluating the models that are currently on the market with their similar conventional counterparts, including characteristics such as cost, performance, efficiency, environmental attributes, and range. Since the increased use of NGVs, along with Alternative Fuel Vehicle (AFVs) in general, represents a public good with many social benefits at the local, national, and global levels, NGVs often receive significant attention in the form of legislative and programmatic support. Some states mandate the use of NGVs, while others provide financial incentives to promote their procurement and use. Furthermore, Federal legislation in the form of tax incentives or procurement requirements can have a significant impact on the NGV market. In order to implement effective legislation or programs, it is vital to have an understanding of the different programs and activities that already exist so that a new project focusing on GHG emission reduction can successfully interact with and build on the experience and lessons learned of those that preceded it. Finally, most programs

  1. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    Science.gov (United States)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  2. All projects related to Uruguay | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    English · Français ... Business Cooperation and Regional Productive Development in Chile, El Salvador, Paraguay, and Uruguay (TTI). Project. Several studies have shown that some forms of collaborative business networking can have a ...

  3. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  4. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  5. Double beta decay: recent developments and projections

    International Nuclear Information System (INIS)

    Avignone, F.T. III; Brodzinski, R.L.; Brown, D.P.; Evans, J.C. Jr.; Hensley, W.K.; Reeves, J.H.; Wogman, N.A.

    1983-08-01

    A report of recent events in both theoretical and experimental aspects of double beta decay is given. General theoretical considerations, recent developments in nuclear structure theory, geochronological determinations of half lives and ratios as well as laboratory experiments are discussed with emphasis on the past three years. Some projections are given. 28 references

  6. Application of demography to energy facility development projects. Working Paper No. 39

    International Nuclear Information System (INIS)

    Krannich, R.S.; Stanfield, G.G.

    1977-01-01

    The emergence of concern regarding socioeconomic consequences of large-scale development projects has resulted in a growing literature directed as estimating the types and levels of various impact dimensions which can be expected to result in human communities experiencing such development. Among these dimensions, a focus on population change has been prevalent. Accurate demographic predictions may be viewed as critical for the adequate comprehension of and preparation for impacts deriving from projects such as energy facility developments. Unfortunately, the state of the art in projecting demographic consequences of energy projects has been generally inadequate. Several of the more influential prior methods for estimating local demographic effects of developing energy facilities are critiqued, although their specific prediction figures are not summarized. The studies reviewed were found to be of dubious practical utility, probably due in part to the failure of basic demography to provide a base of support for applied demographic research. This report sets forth recommendations for the development of a theoretical perspective which would more adequately serve the needs of practitioners attempting to predict local demographic effects of energy facility development

  7. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  8. All projects related to Malawi | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Improved municipal planning in African CiTies – IMPACT for a climate resilient future ... Expanding Business Opportunities for African Youth in Agricultural Value ... This project will develop and test novel, creative, and bold business models ...

  9. Community health outreach program of the Chad-Cameroon petroleum development and pipeline project.

    Science.gov (United States)

    Utzinger, Jürg; Wyss, Kaspar; Moto, Daugla D; Tanner, Marcel; Singer, Burton H

    2004-02-01

    A critical appraisal has been presented of the CHOP for a large-scale energy infrastructure development project that was implemented in two of the world's poorest countries. The project is under close scrutiny from various independent monitoring groups, civil society organizations, and human rights groups. Reviewing the achievements and shortcomings permits the extraction of important lessons that will be critical for the future adoption of the CHOP in the current setting and for the implementation of additional CHOPs elsewhere in the developing world. The authors believe that the design must be flexible, efficient, and innovative so that a CHOP promptly can address pressing public health issues as they arise (eg, epidemic outbreak) and include the needs and demands of the concerned communities. An innovative feature of the current project is the high degree and mix of public-private partnerships. The project's CHOP also relies on partnerships. As elaborated elsewhere, public-private partnerships should be seen as a social experiment--they reveal promise but are not the solution for every problem. For this CHOP, the focus is on partnerships between a multinational consortium, government agencies, and international organizations. The partnerships also include civil society organizations for monitoring and evaluation and local NGOs designated for the implementation of the selected public health interventions within the CHOP. The governments and their respective health policies often form the umbrella under which the partnerships operate. With the increase in globalization, however, the importance and capacities of governments have diminished, and there is growing private-sector involvement. Private enterprise is seen as an efficient, innovative, pragmatic, and powerful means to achieve environmental and social sustainability. Experiences with the partnership configurations in the current CHOP are of importance for tackling grand challenges in global health by

  10. Sustainable development in city districts: BaLaLuZ project - Society; Schlussbericht 'Gesellschaft' - Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Arend, M

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This paper takes a look at society aspects in the four districts and examines the factors that influence the sustainable development of the districts. Topics discussed include basic residential needs, safety, health, and supply along with culture and education. Also examined are the possible topics equality and fairness and participation along with geographical reference and neighbourhood relations. A project for this area of investigation is suggested.

  11. Projets de developpement de curriculum niveau secondaire (Secondary Level Curriculum Development Projects).

    Science.gov (United States)

    Martin, Anne L.

    Two Australian language curriculum development projects are discussed: the Australian Language Levels (ALL) Project and the National Assessment Framework for Languages at Senior Secondary Level (NAFLSSL). While distinct, both projects are closely linked. Each project was launched in 1985 in a favorable climate and in response to cost, enrollment,…

  12. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  13. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  14. The integrated project SOFC600 development of low-temperature SOFC

    DEFF Research Database (Denmark)

    Rietveld, B.; Van Berkel, F.; Zhang-Steenwinkel, Y.

    2009-01-01

    The Integrated Project SOFC600 unites 21 partners jointly working on the research and development of SOFC stack components for operation at 600oC. The project is funded by the European Commission within the 6th Framework Programme. Low-temperature operation is considered essential for achieving c...

  15. Key Findings from the U.S.-India Partnership for Climate Resilience Workshop on Development and Application of Downscaling Climate Projections

    Science.gov (United States)

    Kunkel, K.; Dissen, J.; Easterling, D. R.; Kulkarni, A.; Akhtar, F. H.; Hayhoe, K.; Stoner, A. M. K.; Swaminathan, R.; Thrasher, B. L.

    2017-12-01

    s part of the Department of State U.S.-India Partnership for Climate Resilience (PCR), scientists from NOAA NCEI, CICS-NC, Texas Tech University (TTU), Stanford University (SU), and the Indian Institute of Tropical Meteorology (IITM) held a workshop at IITM in Pune, India during 7-9 March 2017 on the development, techniques and applications of downscaled climate projections. Workshop participants from TTU, SU, and IITM presented state-of-the-art climate downscaling techniques using the ARRM method, NASA NEX climate products, CORDEX-South Asia and analysis tools for resilience planning and sustainable development. PCR collaborators in attendance included Indian practitioners, researchers and other NGO including the WRI Partnership for Resilience and Preparedness (PREP), The Energy and Resources Institute (TERI), and NIH. The scientific techniques were provided to workshop participants in a software package written in R by TTU scientists and several sessions were devoted to hands-on experience with the software package. The workshop further examined case studies on the use of downscaled climate data for decision making in a range of sectors, including human health, agriculture, and water resources management as well as to inform the development of the India State Action Plans. This talk will discuss key outcomes including information needs for downscaling climate projections, importance of QA/QC of the data, key findings from select case studies, and the importance of collaborations and partnerships to apply downscaling projections to help inform the development of the India State Action Plans.

  16. The short- and long-term effects of development projects:evidence from Ethiopia

    OpenAIRE

    Petrikova, Ivica

    2014-01-01

    This paper examines the short-term and long-term impact of development projects on recipients’ wellbeing in Ethiopia. Specifically, it compares the effects of five types of development projects – unconditional and conditional direct transfers, agricultural and social-infrastructure knowledge transfers, and credit projects – on children’s nutrition and on household consumption and income levels. The main finding is that knowledge transfers have the largest positive impact on children’s nutriti...

  17. Unrealized Architectural Projects in Lithuania: Historical Development

    Directory of Open Access Journals (Sweden)

    Indrė Gudelytė

    2012-05-01

    Full Text Available The “unrealized architectural projects” are the building projects, carried out under the specific design task and intended to be built in a particular place (site, though, for certain reasons and circumstances, have never been constructed. However, up to the present day, the topic of the “unbuilt” has been analyzed just episodically in literature and sources. The article touches upon the historical development of unrealized architectural works, as well as their artistic value and role within various historical periods of Lithuanian architecture. One of the chapters briefly reviews the relevance and development of unrealized projects during the period since Czarist Russian occupation (1795 to the restoration of Lithuanian independence (1990. Furthermore, the deeper analysis of the Soviet period (1940–1990 “dead” architecture is presented. While exploring “the unrealized”, attention has been also paid to what was actu ally built, therefore the prevailing architectural styles, tendencies and examples of the corresponding decade (in Lithuania and worldwide have been studied.Article in Lithuanian

  18. Some aspects of the development of the Brazilian Synchroton Radiation Project

    International Nuclear Information System (INIS)

    Danon, J.

    1987-01-01

    The history and development of the Brazilian Synchroton Radiation Project are presented. Several aspects of this project may serve as a guide to achieve success in North-South cooperation. (M.W.O.) [pt

  19. Controlling the Instructional Development Process. Training Development and Research Center Project Number Fifteen.

    Science.gov (United States)

    Sleezer, Catherine M.; Swanson, Richard A.

    Process control is a way of training managers in business and industry to plan, monitor, and communicate the instructional development process of training projects. Two simple and useful tools that managers use in controlling the process of instructional development are the Process Control Planning Sheet and the Process Control Record. The Process…

  20. Neighborhood electric vehicle market test development project: Sacramento electric transportation consortium Ra 93-23 program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Warf, W.R.

    1997-02-01

    The neighborhood electric vehicle (NEV) niche is the object of this market and product test project. The project availed itself of a limited production three wheel, single passenger low performance NEV designed and produced in Denmark to determine the acceptability of the design for production and use in North America. This vehicle, as well as a prototype four wheel vehicle designed and constructed through this project, are entirely reinforced plastic chassis and body. Pacific Electric Vehicles was the primary participant in the Project. Included are the evaluation of drive system components, battery charging schemes, body and chassis and glazing material suitability. The project determined and/or verified many of the realities of motor vehicle development and usage in the U.S., which remain more restrictive than elsewhere. Statistical usage data, maintenance requirements, and user experiences are reported and analyzed.

  1. PROBLEM-SOLVING METHODS OF PROJECT MANAGEMENT OF TECHNICAL DEVELOPMENT FOR AGRICULTURAL PRODUCERS

    Directory of Open Access Journals (Sweden)

    Александр Васильевич СИДОРЧУК

    2015-05-01

    Full Text Available There have been proposed projects of technical development for agricultural producers. The conclusions about system features research projects that underlie the problem-solving methods of project management, have been made. There have been proved these projects (systems that can be simulated with the help of the research and formalization of many events. These events are components of the seven main factors of the agricultural production. The conclusion about the using the research method of the probabilistic nature events in the field of the crops projects with the help of the statistical and imitational models, have been developed. There have been considered the relation between the forecasting of functional marks of the technological systems and the estimation of their cost. And there have been found the optimum correspondence between parameters of the technical supply and planned features of the crops projects.

  2. Large-scale water projects in the developing world: Revisiting the past and looking to the future

    Science.gov (United States)

    Sivakumar, Bellie; Chen, Ji

    2014-05-01

    During the past half a century or so, the developing world has been witnessing a significant increase in freshwater demands due to a combination of factors, including population growth, increased food demand, improved living standards, and water quality degradation. Since there exists significant variability in rainfall and river flow in both space and time, large-scale storage and distribution of water has become a key means to meet these increasing demands. In this regard, large dams and water transfer schemes (including river-linking schemes and virtual water trades) have been playing a key role. While the benefits of such large-scale projects in supplying water for domestic, irrigation, industrial, hydropower, recreational, and other uses both in the countries of their development and in other countries are undeniable, concerns on their negative impacts, such as high initial costs and damages to our ecosystems (e.g. river environment and species) and socio-economic fabric (e.g. relocation and socio-economic changes of affected people) have also been increasing in recent years. These have led to serious debates on the role of large-scale water projects in the developing world and on their future, but the often one-sided nature of such debates have inevitably failed to yield fruitful outcomes thus far. The present study aims to offer a far more balanced perspective on this issue. First, it recognizes and emphasizes the need for still additional large-scale water structures in the developing world in the future, due to the continuing increase in water demands, inefficiency in water use (especially in the agricultural sector), and absence of equivalent and reliable alternatives. Next, it reviews a few important success and failure stories of large-scale water projects in the developing world (and in the developed world), in an effort to arrive at a balanced view on the future role of such projects. Then, it discusses some major challenges in future water planning

  3. Smart grid development and households in experimental projects

    DEFF Research Database (Denmark)

    Hansen, Meiken

    to the electricity grids and call for the development of smart grids. The Danish Smart Grid Strategy states that ‘flexible electricity consumption’ is the main purpose of smart grids in Denmark, envisioning that future consumers will have flexible consumption of electricity. Thus, they are expected to respond...... to the supply side and consume energy when it is available. The goal of this thesis is to investigate how household consumers are integrated in smart grid development activities. More specifically, it focuses on household consumers, as they are represented in experimental projects in the smart grid area...... been little research on the area in Danish smart grid experimental projects. Overall, the consumers are expected, to some extent, to provide flexibility by changing their energy-consuming practices because of economic incentives by means of manual or automated control of devices. Moreover, the Danish...

  4. Bioenergy Project Development and Biomass Supply

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    Modern biomass, and the resulting useful forms of bioenergy produced from it, are anticipated by many advocates to provide a significant contribution to the global primary energy supply of many IEA member countries during the coming decades. For non-member countries, particularly those wishing to achieve economic growth as well as meet the goals for sustainable development, the deployment of modern bioenergy projects and the growing international trade in biomass-based energy carriers offer potential opportunities.

  5. Personal skills and abilities in curriculum development planning for Project Oriented and Problem-Based Learning (POPBL)

    DEFF Research Database (Denmark)

    Moesby, Egon

    2005-01-01

    In this article, the author is giving examples on an approach to include the personal competences in the initial phase of the planning process for a change towards project organized and problem-based learning ? POPBL. A model is presented on how to have trainees recognize the necessity to include...... professional competences as well as personal competences in a new POPBL based curriculum. The article continues by giving an example of a possible method to be used in the developing of a curriculum where the personal skills and abilities are an active and equally valued as the development of the students...

  6. Projects of SR sources including research and development for insertion devices in the USSR

    International Nuclear Information System (INIS)

    Kulipanov, G.

    1990-01-01

    Some technical information on the electron and positron storage rings - SR sources that are being constructed, used or developed at the Novosibirsk Institute of Nuclear Physics (INP), is given. The parameters and construction of wigglers and undulators (electromagnetic, superconducting, and based on permanent magnets) that are intended to be used at such storage rings are described. Various schemes of installation of wigglers, undulators and FEL at storage rings is considered. The ways of minimizing the influence of their magnetic fields on particle motion in storage rings are treated. (author)

  7. Recent Results from NASA's Morphing Project

    Science.gov (United States)

    McGowan, Anna-Maria R.; Washburn, Anthony E.; Horta, Lucas G.; Bryant, Robert G.; Cox, David E.; Siochi, Emilie J.; Padula, Sharon L.; Holloway, Nancy M.

    2002-01-01

    The NASA Morphing Project seeks to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include macro, micro, structural and/or fluidic approaches. The project includes research on smart materials, adaptive structures, micro flow control, biomimetic concepts, optimization and controls. This paper presents an updated overview of the content of the Morphing Project including highlights of recent research results.

  8. RECENT DEVELOPMENTS OF THE IRIS PROJECT OF INTEREST FOR LATIN AMERICA

    International Nuclear Information System (INIS)

    Carelli, M.D.; Petrovic, B.

    2004-01-01

    The IRIS (International Reactor Innovative and Secure) reactor design is being developed by an international consortium of 21 organizations from ten countries, including three members from Brazil and one from Mexico. This reflects the interest that Latin America has for a project which addresses the energy needs of the region. Presented here are some of the most recent developments in the IRIS project. The project's highest priority is the current pre-application licensing with the US NRC, which has required an investigation of the major accident sequences and a preliminary probabilistic risk assessment (PRA). The results of the accident analyses confirmed the outstanding inherent safety of the IRIS configuration and the PRA analyses indicated a core damage frequency due to internal events of the order of 2E-8. This not only highlights the enhanced safety characteristic of IRIS which should enhance its public acceptance, but it has also prompted IRIS to consider the possibility of being licensed without the need for off-site emergency response planning which would have a very positive economic implication. The modular IRIS, with each module rated at ∼ 335 MWe, is of course an ideal size for developing countries as it allows to easily introduce a moderate amount of power on limited electric grids. IRIS can be deployed in single modules in regions only requiring a few hundred MWs or in multiple modules deployed successively at time intervals in large urban areas requiring a larger amount of power increasing with time. IRIS is designed to operate ''hands-off'' as much as possible, with a small crew, having in mind deployment in areas with limited infrastructure. Thus IRIS has a 48-months maintenance interval, long refueling cycles in excess of three years, and is designed to increase as much as possible operational reliability. For example, the project has recently adopted internal control rod drive mechanisms to eliminate vessel head penetrations and the

  9. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  10. Potential of wind power projects under the Clean Development Mechanism in India

    Directory of Open Access Journals (Sweden)

    Michaelowa Axel

    2007-07-01

    Full Text Available Abstract Background So far, the cumulative installed capacity of wind power projects in India is far below their gross potential (≤ 15% despite very high level of policy support, tax benefits, long term financing schemes etc., for more than 10 years etc. One of the major barriers is the high costs of investments in these systems. The Clean Development Mechanism (CDM of the Kyoto Protocol provides industrialized countries with an incentive to invest in emission reduction projects in developing countries to achieve a reduction in CO2 emissions at lowest cost that also promotes sustainable development in the host country. Wind power projects could be of interest under the CDM because they directly displace greenhouse gas emissions while contributing to sustainable rural development, if developed correctly. Results Our estimates indicate that there is a vast theoretical potential of CO2 mitigation by the use of wind energy in India. The annual potential Certified Emissions Reductions (CERs of wind power projects in India could theoretically reach 86 million. Under more realistic assumptions about diffusion of wind power projects based on past experiences with the government-run programmes, annual CER volumes by 2012 could reach 41 to 67 million and 78 to 83 million by 2020. Conclusion The projections based on the past diffusion trend indicate that in India, even with highly favorable assumptions, the dissemination of wind power projects is not likely to reach its maximum estimated potential in another 15 years. CDM could help to achieve the maximum utilization potential more rapidly as compared to the current diffusion trend if supportive policies are introduced.

  11. New developments in IPD-projects

    NARCIS (Netherlands)

    Ir. Dick van Schenk Brill; Ir. K. Kater

    2004-01-01

    Our IPD-projects have changed: more international partners became involved and simultaneously we started to carry out real projects for real companies. This caused a number of problems. In order to be able to give full support to the projects and conclude them with a nice, formal symposium we need

  12. A project to develop restoration methods for buildings and facilities after a terrorist attack

    Energy Technology Data Exchange (ETDEWEB)

    Fingas, M.F. [Environment Canada, Ottawa, ON (Canada). Emergencies Science and Technology Div]|[Environment Canada, Ottawa, ON (Canada). River Road Environmental Technology Centre; Volchek, K.; Hornof, M.; Boudreau, L.; Punt, M. [SAIC Canada, Ottawa, ON (Canada); Payette, P.; Best, M. [Health Canada, Ottawa, ON (Canada); Garbutt, M.; Krishnan, J.; Wagener, S.; Bernard, K. [Health Canada, Winnipeg, MB (Canada); Cousins, T.; Haslip, D. [Defence Research and Development Canada, Ottawa, ON (Canada)

    2004-07-01

    A multi-agent project was initiated to review site restoration after a terrorist attack. The objective was to acquire and compile information on all known restoration procedures for buildings, exteriors of buildings, their interior contents, and adjacent areas such as parking lots, lawns and vehicles. All procedures were then tested and validated. Restoration procedures included pickup, neutralization, decontamination, removal and final destruction/deposition of the contaminant, cleaning material and contaminated debris resulting from the terrorist act. This research and development project considered chemical, biological and nuclear contamination with the intent to develop methods to decontaminate and restore buildings after a chemical, biological and radiological (CBR) attack. Ideas were collected from work conducted around the world. The efficacy of best candidates was tested along with all selected chemical target items. The project also involved the preparation of procedures for decontamination and restoration. Ultimately, a tradeoff decision basis will be developed to provide information on abandonment and quarantine versus cleanup. The study revealed that there are several technologies that can be used for the decontamination of structures and equipment after acts of terrorism, however, no one technique will work for all contaminants on all surfaces. The selection of a decontamination method depends on the contaminant, the surface being decontaminated and economic, social and health factors. The amount of waste generated by decontamination is a major feasibility factor. 25 refs., 6 tabs.

  13. Student project of optical system analysis API-library development

    Science.gov (United States)

    Ivanova, Tatiana; Zhukova, Tatiana; Dantcaranov, Ruslan; Romanova, Maria; Zhadin, Alexander; Ivanov, Vyacheslav; Kalinkina, Olga

    2017-08-01

    In the paper API-library software developed by students of Applied and Computer Optics Department (ITMO University) for optical system design is presented. The library performs paraxial and real ray tracing, calculates 3d order (Seidel) aberration and real ray aberration of axis and non-axis beams (wave, lateral, longitudinal, coma, distortion etc.) and finally, approximate wave aberration by Zernike polynomials. Real aperture can be calculated by considering of real rays tracing failure on each surface. So far we assume optical system is centered, with spherical or 2d order aspherical surfaces. Optical glasses can be set directly by refraction index or by dispersion coefficients. The library can be used for education or research purposes in optical system design area. It provides ready to use software functions for optical system simulation and analysis that developer can simply plug into their software development for different purposes, for example for some specific synthesis tasks or investigation of new optimization modes. In the paper we present an example of using the library for development of cemented doublet synthesis software based on Slusarev's methodology. The library is used in optical system optimization recipes course for deep studying of optimization model and its application for optical system design. Development of such software is an excellent experience for students and help to understanding optical image modeling and quality analysis. This development is organized as student group joint project. We try to organize it as a group in real research and development project, so each student has his own role in the project and then use whole library functionality in his own master or bachelor thesis. Working in such group gives students useful experience and opportunity to work as research and development engineer of scientific software in the future.

  14. Cyrogenic Life Support Technology Development Project

    Science.gov (United States)

    Bush, David R.

    2015-01-01

    KSC has used cryogenic life support (liquid air based) technology successfully for many years to support spaceflight operations. This technology has many benefits unique to cryogenics when compared to traditional compressed gas systems: passive cooling, lighter, longer duration, and lower operating pressure. However, there are also several limiting factors that have prevented the technology from being commercialized. The National Institute of Occupational Safety and Health, Office of Mine Safety and Health Research (NIOSH-OMSHR) has partnered with NASA to develop a complete liquid air based life support solution for emergency mine escape and rescue. The project will develop and demonstrate various prototype devices and incorporate new technological innovations that have to date prevented commercialization.

  15. Software development infrastructure for the HYBRID modeling and simulation project

    International Nuclear Information System (INIS)

    Epiney, Aaron S.; Kinoshita, Robert A.; Kim, Jong Suk; Rabiti, Cristian; Greenwood, M. Scott

    2016-01-01

    One of the goals of the HYBRID modeling and simulation project is to assess the economic viability of hybrid systems in a market that contains renewable energy sources like wind. The idea is that it is possible for the nuclear plant to sell non-electric energy cushions, which absorb (at least partially) the volatility introduced by the renewable energy sources. This system is currently modeled in the Modelica programming language. To assess the economics of the system, an optimization procedure is trying to find the minimal cost of electricity production. The RAVEN code is used as a driver for the whole problem. It is assumed that at this stage, the HYBRID modeling and simulation framework can be classified as non-safety “research and development” software. The associated quality level is Quality Level 3 software. This imposes low requirements on quality control, testing and documentation. The quality level could change as the application development continues.Despite the low quality requirement level, a workflow for the HYBRID developers has been defined that include a coding standard and some documentation and testing requirements. The repository performs automated unit testing of contributed models. The automated testing is achieved via an open-source python script called BuildingsP from Lawrence Berkeley National Lab. BuildingsPy runs Modelica simulation tests using Dymola in an automated manner and generates and runs unit tests from Modelica scripts written by developers. In order to assure effective communication between the different national laboratories a biweekly videoconference has been set-up, where developers can report their progress and issues. In addition, periodic face-face meetings are organized intended to discuss high-level strategy decisions with management. A second means of communication is the developer email list. This is a list to which everybody can send emails that will be received by the collective of the developers and managers

  16. Software development infrastructure for the HYBRID modeling and simulation project

    Energy Technology Data Exchange (ETDEWEB)

    Epiney, Aaron S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinoshita, Robert A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kim, Jong Suk [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rabiti, Cristian [Idaho National Lab. (INL), Idaho Falls, ID (United States); Greenwood, M. Scott [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    One of the goals of the HYBRID modeling and simulation project is to assess the economic viability of hybrid systems in a market that contains renewable energy sources like wind. The idea is that it is possible for the nuclear plant to sell non-electric energy cushions, which absorb (at least partially) the volatility introduced by the renewable energy sources. This system is currently modeled in the Modelica programming language. To assess the economics of the system, an optimization procedure is trying to find the minimal cost of electricity production. The RAVEN code is used as a driver for the whole problem. It is assumed that at this stage, the HYBRID modeling and simulation framework can be classified as non-safety “research and development” software. The associated quality level is Quality Level 3 software. This imposes low requirements on quality control, testing and documentation. The quality level could change as the application development continues.Despite the low quality requirement level, a workflow for the HYBRID developers has been defined that include a coding standard and some documentation and testing requirements. The repository performs automated unit testing of contributed models. The automated testing is achieved via an open-source python script called BuildingsP from Lawrence Berkeley National Lab. BuildingsPy runs Modelica simulation tests using Dymola in an automated manner and generates and runs unit tests from Modelica scripts written by developers. In order to assure effective communication between the different national laboratories a biweekly videoconference has been set-up, where developers can report their progress and issues. In addition, periodic face-face meetings are organized intended to discuss high-level strategy decisions with management. A second means of communication is the developer email list. This is a list to which everybody can send emails that will be received by the collective of the developers and managers

  17. Performance Criteria of Spatial Development Projects Based on Interregional Integration

    Directory of Open Access Journals (Sweden)

    Elena Viktorovna Kurushina

    2018-03-01

    Full Text Available The search of efficient ways for the development of regional socio-economic space is a relevant problem. The authors consider the models of spatial organization according to the Spatial Development Strategy of the Russian Federation until 2030. We conduct the comparative analysis of scenarios for the polarized and diversified spatial growth. Many investigations consider the concepts of polarized and endogenous growth. This study proposes a methodology to assess the development of macroregions and to increase the viability of interregional integration projects. To develop this methodology, we formulate scientific principles and indirect criteria of the project performance conforming to the theory of regional integration. In addition to the territorial community and complementarity of the development potentials, regional integration in the country should be based on the principles of security, networking, limited quantity and awareness of the potential project participants. Integration should ensure synergetic effects and take into account cultural and historical closeness, that manifests in the common mentality and existing economic relations among regions. The calculation results regarding the indirect criteria are obtained using the methods of classification and spatial correlation. This study confirms the hypothesis, that the formation of the Western Siberian and Ural macro-regions is appropriate. We have concluded this on the basis of the criteria of economic development, economic integration, the similarity of regional spaces as habitats, and a number of participants for the subjects of the Ural Federal District. The projection of the patterns of international economic integration to the interregional level allows predicting the highest probability for the successful cooperation among the Western Siberian regions with a high level of economic development. The authors’ method has revealed a high synchronization between the economies of

  18. RadGenomics project

    Energy Technology Data Exchange (ETDEWEB)

    Iwakawa, Mayumi; Imai, Takashi; Harada, Yoshinobu [National Inst. of Radiological Sciences, Chiba (Japan). Frontier Research Center] [and others

    2002-06-01

    Human health is determined by a complex interplay of factors, predominantly between genetic susceptibility, environmental conditions and aging. The ultimate aim of the RadGenomics (Radiation Genomics) project is to understand the implications of heterogeneity in responses to ionizing radiation arising from genetic variation between individuals in the human population. The rapid progression of the human genome sequencing and the recent development of new technologies in molecular genetics are providing us with new opportunities to understand the genetic basis of individual differences in susceptibility to natural and/or artificial environmental factors, including radiation exposure. The RadGenomics project will inevitably lead to improved protocols for personalized radiotherapy and reductions in the potential side effects of such treatment. The project will contribute to future research into the molecular mechanisms of radiation sensitivity in humans and will stimulate the development of new high-throughput technologies for a broader application of biological and medical sciences. The staff members are specialists in a variety of fields, including genome science, radiation biology, medical science, molecular biology, and informatics, and have joined the RadGenomics project from various universities, companies, and research institutes. The project started in April 2001. (author)

  19. RadGenomics project

    International Nuclear Information System (INIS)

    Iwakawa, Mayumi; Imai, Takashi; Harada, Yoshinobu

    2002-01-01

    Human health is determined by a complex interplay of factors, predominantly between genetic susceptibility, environmental conditions and aging. The ultimate aim of the RadGenomics (Radiation Genomics) project is to understand the implications of heterogeneity in responses to ionizing radiation arising from genetic variation between individuals in the human population. The rapid progression of the human genome sequencing and the recent development of new technologies in molecular genetics are providing us with new opportunities to understand the genetic basis of individual differences in susceptibility to natural and/or artificial environmental factors, including radiation exposure. The RadGenomics project will inevitably lead to improved protocols for personalized radiotherapy and reductions in the potential side effects of such treatment. The project will contribute to future research into the molecular mechanisms of radiation sensitivity in humans and will stimulate the development of new high-throughput technologies for a broader application of biological and medical sciences. The staff members are specialists in a variety of fields, including genome science, radiation biology, medical science, molecular biology, and informatics, and have joined the RadGenomics project from various universities, companies, and research institutes. The project started in April 2001. (author)

  20. Faculty Development and Quality Assurance in the EU ERAMIS Project

    Directory of Open Access Journals (Sweden)

    Agathe Merceron

    2012-07-01

    Full Text Available The aim of the ERAMIS project is to create a
    network of Masters degrees “Informatics as a Second
    Competence” in nine beneficiary universities of Kazakhstan,
    Kyrgyzstan and Russia. This contribution presents how
    faculty development is organized and quality assurance
    implemented inside this project.

  1. View all projects | Page 3 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Project. Sri Lanka is turning to aquaculture to diversify its rural economy and increase food production, particularly in the northern and eastern provinces, which are recovering from the civil conflict. Topic(s): AQUACULTURE, AGRICULTURAL EXTENSION, GENDER ANALYSIS, DEVELOPMENT COMMUNICATION, Gender.

  2. Development of heat pump technology in eco-energy city project

    Energy Technology Data Exchange (ETDEWEB)

    Omata, Tomio [New Energy Development Organization (Japan); Ogisu, Yoshihiro [Office of Eco-Energy City Project, Energy Conservation Center (Japan)

    1999-07-01

    In the New Sunshine Project conducted by MITI Japan, Eco-Energy City-Project covers the research area of utilization of industrial and municipal waste heat. For the further utilization of waste heat, several research programs are carried out for recovery and conversion of waste heat, transportation and storage of waste heat and final use of rather low temperature heat transported. Various types of heat driven heat pumps are developed in the Eco-Energy City Project. Concept of the Project is to utilize industrial and municipal waste heat for the city where energy demand is increasing. These heat pumps will contribute for the reduction of CO{sub 2} emission. (orig.)

  3. Next Generation Life Support Project: Development of Advanced Technologies for Human Exploration Missions

    Science.gov (United States)

    Barta, Daniel J.

    2012-01-01

    Next Generation Life Support (NGLS) is one of several technology development projects sponsored by the National Aeronautics and Space Administration s Game Changing Development Program. NGLS is developing life support technologies (including water recovery, and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processing. The selected technologies within each of these areas are focused on increasing affordability, reliability, and vehicle self sufficiency while decreasing mass and enabling long duration exploration. The RCA and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Exploration Extravehicular Mobility Unit (EMU), with focus on prototyping and integrated testing. The focus of the Rapid Cycle Amine (RCA) swing-bed ventilation task is to provide integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The Variable Oxygen Regulator technology will significantly increase the number of pressure settings available to the space suit. Current spacesuit pressure regulators are limited to only two settings while the adjustability of the advanced regulator will be nearly continuous. The Alternative Water Processor efforts will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water, based on natural biological processes and membrane-based post treatment. The technologies will support a capability-driven architecture for extending human presence beyond low Earth orbit to potential destinations such as the Moon, near Earth asteroids and Mars.

  4. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    Science.gov (United States)

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Introduction Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner

  5. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    Directory of Open Access Journals (Sweden)

    Rosanna Färnman

    2016-10-01

    Full Text Available Introduction: Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design: Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results: The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion: The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed

  6. The surgical care improvement project and prevention of post-operative infection, including surgical site infection.

    Science.gov (United States)

    Rosenberger, Laura H; Politano, Amani D; Sawyer, Robert G

    2011-06-01

    In response to inconsistent compliance with infection prevention measures, the Centers for Medicare & Medicaid Services collaborated with the U.S. Centers for Disease Control and Prevention on the Surgical Infection Prevention (SIP) project, introduced in 2002. Quality improvement measures were developed to standardize processes to increase compliance. In 2006, the Surgical Care Improvement Project (SCIP) developed out of the SIP project and its process measures. These initiatives, published in the Specifications Manual for National Inpatient Quality Measures, outline process and outcome measures. This continually evolving manual is intended to provide standard quality measures to unify documentation and track standards of care. Seven of the SCIP initiatives apply to the peri-operative period: Prophylactic antibiotics should be received within 1 h prior to surgical incision (1), be selected for activity against the most probable antimicrobial contaminants (2), and be discontinued within 24 h after the surgery end-time (3); (4) euglycemia should be maintained, with well-controlled morning blood glucose concentrations on the first two post-operative days, especially in cardiac surgery patients; (6) hair at the surgical site should be removed with clippers or by depilatory methods, not with a blade; (9) urinary catheters are to be removed within the first two post-operative days; and (10) normothermia should be maintained peri-operatively. There is strong evidence that implementation of protocols that standardize practices reduce the risk of surgical infection. The SCIP initiative targets complications that account for a significant portion of preventable morbidity as well as cost. One of the goals of the SCIP guidelines was a 25% reduction in the incidence of surgical site infections from implementation through 2010. Process measures are becoming routine, and as we practice more evidence-based medicine, it falls to us, the surgeons and scientists, to be active

  7. Risks and chances of combined forestry and biomass projects under the Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Dutschke, Michael; Kapp, Gerald; Lehmann, Anna; Schaefer, Volkmar (Hamburg Inst. International Economics (Germany))

    2006-06-15

    The Clean Development Mechanism (CDM) aims at reducing greenhouse gas (GHG) emissions, while at the same time taking up CO{sub 2} from the atmosphere in vegetation by means of afforestation and reforestation. In spite of these options being complementary, rules and modalities for both project classes are being treated separately in the relevant decisions by the Conference of the Parties to the UN Framework Convention on Climate Change. The present study reviews the state of bioenergy use in developing countries, modalities and procedures under the CDM, and the potential for transaction cost reduction in climate mitigation projects. There are four potential types of combinations in the matrix between small-scale - large-scale / afforestation and reforestation - bioenergy activities. We develop criteria for assessing sustainable development benefits and present an example project for each of the potential project types. We find that the individual risks of single-category projects do not increase when combining project categories and that each combination holds potential for integrated sustainability benefits. Risks for local livelihoods do increase with project size, but a transparent, participatory planning phase is able to counterbalance smallholders' lack of negotiation power. Further research will have to develop concrete project examples and blueprints with approved CDM methodologies, thereby decreasing transaction costs and risk for all potential project partners. (au)

  8. The Development of an Instrument to Measure the Project Competences of College Students in Online Project-Based Learning

    Science.gov (United States)

    Lin, Chien-Liang

    2018-02-01

    This study sought to develop a self-report instrument to be used in the assessment of the project competences of college students engaged in online project-based learning. Three scales of the KIPSSE instrument developed for this study, namely, the knowledge integration, project skills, and self-efficacy scales, were based on related theories and the analysis results of three project advisor interviews. Those items of knowledge integration and project skill scales focused on the integration of different disciplines and technological skills separately. Two samples of data were collected from information technology-related courses taught with an online project-based learning strategy over different semesters at a college in southern Taiwan. The validity and reliability of the KIPSSE instrument were confirmed through item analysis and confirmatory factor analysis using structural equation modeling of two samples of students' online response sets separately. The Cronbach's alpha reliability coefficient for the entire instrument was 0.931; for each scale, the alpha ranged from 0.832 to 0.907. There was also a significant correlation ( r = 0.55, p < 0.01) between the KIPSSE instrument results and the students' product evaluation scores. The findings of this study confirmed the validity and reliability of the KIPSSE instrument. The confirmation process and related implications are also discussed.

  9. Fundraising Strategies Developed by MBA students in Project-Based Learning Courses

    Directory of Open Access Journals (Sweden)

    Joao Alberto Arantes do Amaral

    2016-12-01

    Full Text Available The ability to raise funds is a skill that most modern project managers need. While a good deal of literature exists on the strategies NGOs employ to raise funds for their operations, less attention has been paid to the strategies used by students involved in Project-Based Learning courses that often partner with NGOs. Fundraising is an important skill that not only provides students with opportunities for creativity, but also helps them develop the communication skills they will need in the work they do after they graduate.In this paper, we discuss the fundraising strategies developed by MBA students in 204 social projects completed between 2002 and 2014. The projects were done in partnership with 39 community partners in Sao Paulo, Brazil (NGOs and Public Institutions. In our study, we followed quantitative and qualitative research methods, analyzing data and documents from the projects’ databases. We identified six different fundraising strategies: organizing raffles, soliciting donations from private corporations, organizing paying events, utilizing online social networks developing crowdfunding, and soliciting individual donations.

  10. Hamaca Heavy Oil Project : lessons learned and an evolving development strategy

    Energy Technology Data Exchange (ETDEWEB)

    Gipson, L.J.; Owen, R.; Robertson, C.R. [Petrolera Ameriven/Phillips Petroleum, Caracas, (Venezuela)

    2002-07-01

    The Hamaca extra-heavy crude oil project is one of four integrated extra-heavy crude oil development projects underway in the Faja stratigraphic trap in the Orinoco heavy oil belt of eastern Venezuela. The Faja contains about 1.2 trillion barrels of heavy and extra heavy crude oil. It is divided into the Machete, Zuata, Hamaca and Cerro Negro regions that have been developed by Petroleos de Venezuela SA (PDVSA). The Hamaca region is further subdivided into 25 blocks. The Hamaca integrated project will involve the drilling of more than 1000 horizontal wells over a 35 year period. The project will also involve the installation of more than 200 miles of crude and naptha pipelines, plus an upgrading refinery to convert the 8 API extra heavy crude into a 26 API final product. This presentation describes the performance of the different well types and highlights Petrolera Ameriven's criteria and strategy for future development. Openhole log data superimposed on 2D and 3D seismic displays are presented to show how they can be used for geosteering. 2 refs., 10 figs.

  11. FEASIBILITY AND FINANCIAL ISSUES OF CLEAN PROJECT DEVELOPMENT MECHANISM IN ARGENTINA

    Directory of Open Access Journals (Sweden)

    García Fronti, Inés

    2013-01-01

    Full Text Available The objective of the research is to determine the current status and perspectives presented in Argentina in 2011 for different stakeholders regarding the development, execution and implementation of projects of clean development mechanism (CDM under the Kioto Protocol, with emphasis on the analysis of accounting issues.In the Argentinean research there is an analysis of the accounting issues under discussion and -taking as theirtory the Brazilian study mentioned- has surveyed and interviewed stakeholders belonging to government agencies, professional bodies such as councils accounting professionals in economics from different jurisdictions, academics, consultants and companies that deal or CDM projects plan to address issues relating to general and their views on potential regulations from bodies of the accounting profession and/or governmental and motivation of business and accounting issues of CDM projects such as moments of recognition of accounting entries and the different forms of the same recognition. The results showed that knowledge on the subject of stakeholders is initial but is possible an important increase in the future, accompanied by the development in Argentina of such projects.

  12. Energy: options for the future. Curriculum development project for high school teachers. Final report. [Packet

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, T.O.

    1978-04-01

    Recent state and regional energy crises demonstrate the delicate balance between energy systems, the environment, and the economy. Indeed, the interaction between these three elements of society is very complex. This project develops curriculum materials that would better provide students with an understanding and awareness of fundamental principles of energy supply, conversion processes, and utilization now and in the future. The project had two specific objectives: to transfer knowledge of energy systems, analysis techniques, and advanced technologies from the energy analyst community to the teacher participants; and to involve teachers in the preparation of modular case studies on energy issues for use within the classroom. These curriculum modules are intended to enhance the teacher's ability to provide energy-related education to students within his or her own academic setting. The project is organized as a three-week summer program, as noted in the flyer (Appendix A). Mornings are spent in seminars with energy and environmental specialists (their handout lecture notes are included as Appendix B); afternoons are devoted to high school curriculum development based on the seminar discussions. The curriculum development is limited to five areas: conservation, electricity demand scheduling, energy in the food system, new technologies (solar, wind, biomass), and environment. Appendix C consists of one-day lession plans in these areas.

  13. All projects related to | Page 178 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Brazil, South America, China, Far East Asia, India, South Africa, North of Sahara, South of Sahara, North and Central America, Central Asia, South Asia. Total Funding: CA$ 95,730.00. Analyzing Financial Flows from Emerging Economies to the Developing World. Project. The context of development assistance is ...

  14. Developing Novel Reservoir Rule Curves Using Seasonal Inflow Projections

    Science.gov (United States)

    Tseng, Hsin-yi; Tung, Ching-pin

    2015-04-01

    Due to significant seasonal rainfall variations, reservoirs and their flexible operational rules are indispensable to Taiwan. Furthermore, with the intensifying impacts of climate change on extreme climate, the frequency of droughts in Taiwan has been increasing in recent years. Drought is a creeping phenomenon, the slow onset character of drought makes it difficult to detect at an early stage, and causes delays on making the best decision of allocating water. For these reasons, novel reservoir rule curves using projected seasonal streamflow are proposed in this study, which can potentially reduce the adverse effects of drought. This study dedicated establishing new rule curves which consider both current available storage and anticipated monthly inflows with leading time of two months to reduce the risk of water shortage. The monthly inflows are projected based on the seasonal climate forecasts from Central Weather Bureau (CWB), which a weather generation model is used to produce daily weather data for the hydrological component of the GWLF. To incorporate future monthly inflow projections into rule curves, this study designs a decision flow index which is a linear combination of current available storage and inflow projections with leading time of 2 months. By optimizing linear relationship coefficients of decision flow index, the shape of rule curves and the percent of water supply in each zone, the best rule curves to decrease water shortage risk and impacts can be developed. The Shimen Reservoir in the northern Taiwan is used as a case study to demonstrate the proposed method. Existing rule curves (M5 curves) of Shimen Reservoir are compared with two cases of new rule curves, including hindcast simulations and historic seasonal forecasts. The results show new rule curves can decrease the total water shortage ratio, and in addition, it can also allocate shortage amount to preceding months to avoid extreme shortage events. Even though some uncertainties in

  15. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  16. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  17. The value of flexibility in offshore oil field development projects

    Energy Technology Data Exchange (ETDEWEB)

    Lund, Morten Wattengaard

    1997-12-31

    Offshore oil field development projects often face substantial uncertainties and the operator`s ability to take corrective actions is very important. The main objective of this thesis was to identify the value of flexibility in such projects. Estimates obtained from exploratory wells can be dependent through common information. The effect of stochastic dependence was illustrated by an analytical model, where the dependence was expressed in terms of correlation between estimate errors. It was found that a high degree of correlation might distort the benefit of additional exploration. A prototype that covered the major phases of the project was developed to study the value of flexibility. The prototype was a Markov decision process, solved by stochastic dynamic programming. Based on discussions with Norwegian oil companies, three uncertain variables were addressed: the reservoir volume, the well rate, and the oil price. Simple descriptions were used to mimic the uncertainty. The reservoir was thus depicted as a tank model, and the well rate and oil prices were assumed to follow Markov processes. Flexibility was restricted to managerial as opposed to financial flexibility. Application of the prototype to a case study, based on an ongoing field development, showed that flexibility might be of considerable value to the project. In particular, capacity flexibility and initiation flexibility were identified as important aspects of the development. The results also emphasized the importance of a joint assessment, as the values of different flexibility types are not additive. In conclusion, the proposed model motivates further development of the decision support system presently available. Future decision making should therefore be made within a framework that gives consideration to flexibility. 129 refs., 46 figs., 23 tabs.

  18. Using commodity-indexed financing to fund OPEC/Alaska's development projects

    International Nuclear Information System (INIS)

    Essayyad, Musa

    1992-01-01

    An impediment to the process of economic diversification in OPEC and Alaska is the lack of favourable access to local and international capital markets to finance development projects, particularly mineral resource development. This paper highlights the importance of commodity-indexed bonds, including oil- and gold- indexed bonds, as a financing alternative to supplement the supply shortage of loanable funds from conventional, local and international commercial banks. The indexation concept is discussed, features of different bonds issued to date are contrasted and the benefits and risks for borrowers and investors are highlighted. An analysis is made of the experience of OPEC and Alaska in using commodity-indexed bonds and the feasibility of Alaska and some OPEC countries entering into commodity-linked-financed joint ventures is examined. Future prospects for commodity-linked bonds are explored. Not withstanding the fact that the immediate market timing is unfavourable, the long-term benefits of commodity-indexed securities are recognized. (U.K.)

  19. Development of a 3D Finite Element code for Forging - An overview of the Brite/Euram project EFFORTS

    DEFF Research Database (Denmark)

    Bay, Niels; Andreasen, Jan Lasson; Olsson, David Dam

    2001-01-01

    The present paper presents an overview of the Brite/EuRam project EFFORTS (Enhanced Framework for FOrging design using Reliable Three-dimensional Simulation). A short description is given of methodologies developed including improvements of the numerical analysis, establishment of new constitutive...

  20. The UNC/UMN Baby Connectome Project (BCP): An overview of the study design and protocol development.

    Science.gov (United States)

    Howell, Brittany R; Styner, Martin A; Gao, Wei; Yap, Pew-Thian; Wang, Li; Baluyot, Kristine; Yacoub, Essa; Chen, Geng; Potts, Taylor; Salzwedel, Andrew; Li, Gang; Gilmore, John H; Piven, Joseph; Smith, J Keith; Shen, Dinggang; Ugurbil, Kamil; Zhu, Hongtu; Lin, Weili; Elison, Jed T

    2018-03-22

    The human brain undergoes extensive and dynamic growth during the first years of life. The UNC/UMN Baby Connectome Project (BCP), one of the Lifespan Connectome Projects funded by NIH, is an ongoing study jointly conducted by investigators at the University of North Carolina at Chapel Hill and the University of Minnesota. The primary objective of the BCP is to characterize brain and behavioral development in typically developing infants across the first 5 years of life. The ultimate goals are to chart emerging patterns of structural and functional connectivity during this period, map brain-behavior associations, and establish a foundation from which to further explore trajectories of health and disease. To accomplish these goals, we are combining state of the art MRI acquisition and analysis techniques, including high-resolution structural MRI (T1-and T2-weighted images), diffusion imaging (dMRI), and resting state functional connectivity MRI (rfMRI). While the overall design of the BCP largely is built on the protocol developed by the Lifespan Human Connectome Project (HCP), given the unique age range of the BCP cohort, additional optimization of imaging parameters and consideration of an age appropriate battery of behavioral assessments were needed. Here we provide the overall study protocol, including approaches for subject recruitment, strategies for imaging typically developing children 0-5 years of age without sedation, imaging protocol and optimization, a description of the battery of behavioral assessments, and QA/QC procedures. Combining HCP inspired neuroimaging data with well-established behavioral assessments during this time period will yield an invaluable resource for the scientific community. Copyright © 2018 Elsevier Inc. All rights reserved.

  1. Research Projects for Interrogations of Biological Systems: Training for the Development of Novel Radiotracers

    International Nuclear Information System (INIS)

    Jurisson, Silvia S.; Lever, Susan Z.; Robertson, J. David

    2016-01-01

    This grant was situated at the University of Missouri to train Ph.D. scientists in radiochemistry and synthetic chemistry in conjunction with Faculty from the Interdisciplinary Plant Group, Division of Biological Sciences, the MU Research Reactor Center, Molecular Biology and the Radiopharmaceutical Sciences Institute. This project was collaborative with Brookhaven National Laboratory (Richard Ferrieri, PI). Projects for the Ph.D. candidates included novel probe development for peptides, nucleosides, small molecules or radiometals, the direct use of radiometals as probes, or nuclear techniques for analysis. The projects for the postdoctoral fellow involved synthetic chemistry for the preparation of precursors for novel tracers that will be radiolabeled with "1"8F or other appropriate radionuclides. The skill sets of our team members allowed us to prepare probes with positron or single photon emitters, as well as ones that are dual-labeled (fluorescent and radiolabeled). We focused our technical advances to those that will be broadly applicable to any research field.

  2. Research Projects for Interrogations of Biological Systems: Training for the Development of Novel Radiotracers

    Energy Technology Data Exchange (ETDEWEB)

    Jurisson, Silvia S. [Univ. of Missouri, Columbia, MO (United States); Lever, Susan Z. [Univ. of Missouri, Columbia, MO (United States); Robertson, J. David [Univ. of Missouri, Columbia, MO (United States)

    2016-10-04

    This grant was situated at the University of Missouri to train Ph.D. scientists in radiochemistry and synthetic chemistry in conjunction with Faculty from the Interdisciplinary Plant Group, Division of Biological Sciences, the MU Research Reactor Center, Molecular Biology and the Radiopharmaceutical Sciences Institute. This project was collaborative with Brookhaven National Laboratory (Richard Ferrieri, PI). Projects for the Ph.D. candidates included novel probe development for peptides, nucleosides, small molecules or radiometals, the direct use of radiometals as probes, or nuclear techniques for analysis. The projects for the postdoctoral fellow involved synthetic chemistry for the preparation of precursors for novel tracers that will be radiolabeled with 18F or other appropriate radionuclides. The skill sets of our team members allowed us to prepare probes with positron or single photon emitters, as well as ones that are dual-labeled (fluorescent and radiolabeled). We focused our technical advances to those that will be broadly applicable to any research field.

  3. SEU blending project concept to commercial operation. Part 1: process development

    International Nuclear Information System (INIS)

    Ioffe, M.S.; Bhattacharjee, S.; Oliver, A.J.; Ozberk, E.

    2004-01-01

    The process development test program for production of Slightly Enriched Uranium (SEU) dioxide powder had started with 100 g Low Enriched Uranium (LEU) dioxide powder samples obtained from different suppliers. Encouraging results obtained in the initial test program established a basis for working with 9.5 kg LEU powder samples and production of larger quantities of SEU powder for characterization to meet the target quality and ensuring development of process design criteria for the commercial scale plant design. Similarly, the process development test program for production of Blended Dysprosium and Uranium (BDU) oxide powders was initiated using different Dy 2 O 3 powder samples from different suppliers. The variability of the quality of Dy 2 O 3 powder samples received from different suppliers resulted in substantial investigation in characterization of Dy 2 O 3 powders. The test program for both products required forming a cross-functional project team from several departments within Cameco with the focus of the development work to be carried out at the Cameco Technology Development. Many aspects of developing two new products were addressed. These included developing design criteria for preparation of SEU and BDU powders for a Demonstration Irradiation (DI) program and commercial scale plant, Quality Assurance program (including specifications for SEU and BDU powder products, SEU and BDU scraps, Cameco Quality Specifications for purchasing LEU and Dy 2 O 3 powders, and Inspection and Test Plan for SEU and BDU powder production), accurate uranium accountability, enhanced safety requirements, bench and laboratory test safety and operability manuals and procedures for analysis. (author)

  4. In-house developed methodologies and tools for decommissioning projects

    International Nuclear Information System (INIS)

    Detilleux, Michel; Centner, Baudouin

    2007-01-01

    The paper describes different methodologies and tools developed in-house by Tractebel Engineering to facilitate the engineering works to be carried out especially in the frame of decommissioning projects. Three examples of tools with their corresponding results are presented: - The LLWAA-DECOM code, a software developed for the radiological characterization of contaminated systems and equipment. The code constitutes a specific module of more general software that was originally developed to characterize radioactive waste streams in order to be able to declare the radiological inventory of critical nuclides, in particular difficult-to-measure radionuclides, to the Authorities. In the case of LLWAA-DECOM, deposited activities inside contaminated equipment (piping, tanks, heat exchangers...) and scaling factors between nuclides, at any given time of the decommissioning time schedule, are calculated on the basis of physical characteristics of the systems and of operational parameters of the nuclear power plant. This methodology was applied to assess decommissioning costs of Belgian NPPs, to characterize the primary system of Trino NPP in Italy, to characterize the equipment of miscellaneous circuits of Ignalina NPP and of Kozloduy unit 1 and, to calculate remaining dose rates around equipment in the frame of the preparation of decommissioning activities; - The VISIMODELLER tool, a user friendly CAD interface developed to ease the introduction of lay-out areas in a software named VISIPLAN. VISIPLAN is a 3D dose rate assessment tool for ALARA work planning, developed by the Belgian Nuclear Research Centre SCK.CEN. Both softwares were used for projects such as the steam generators replacements in Belgian NPPs or the preparation of the decommissioning of units 1 and 2 of Kozloduy NPP; - The DBS software, a software developed to manage the different kinds of activities that are part of the general time schedule of a decommissioning project. For each activity, when relevant

  5. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  6. Development of a time projection chamber for Crystal Ball at MAMI

    Energy Technology Data Exchange (ETDEWEB)

    Steffen, Oliver; Wolfes, Martin; Gradl, Wolfgang [Mainz Univ. (Germany). Inst. fuer Kernphysik; Collaboration: A2-Collaboration

    2013-07-01

    The Crystal Ball Collaboration uses energy tagged bremstrahlung photons produced from the MAMI electron beam to study photo-induced reactions on nucleons and nuclei. The Crystal Ball/TAPS 4π calorimeter setup is optimized for the detection of neutral final states. Charged particles are identified and measured by the inner detector system including a two layer MWPC. The increased rate of charged particles in current and future experiments exceeds the rate capability of these MWPCs. We are developing a small Time Projection Chamber with triple GEM readout meeting the stringent space requirements of the Crystal Ball experiment. This new tracking detector will feature higher rate capabilities and allows better track reconstruction. % A small GEM-TPC prototype has successfully been tested in the MAMI electron beam, showing good first results on rate capability and track reconstruction. Additional simulation studies on track resolution, detector geometry and acceptance are done to optimize the design. This poster gives an overview of the current status of the project and present the latest results.

  7. Can enterprise architectures reduce failure in development projects?

    NARCIS (Netherlands)

    Janssen, M.F.W.H.A.; Klievink, B.

    2012-01-01

    Purpose: Scant attention has been given to the role of enterprise architecture (EA) in relationship to risk management in information system development projects. Even less attention has been given to the inter-organizational setting. The aim of this paper is to better understand this relationship.

  8. Co-operation of the CMEA member countries in the development of different reactor types, including certain aspects of their nuclear fuel cycle

    International Nuclear Information System (INIS)

    Panasenkov, A.; Barbur, I.; Barchenkov, A.; Molnar, L.; Tolpygo, V.; Khake, V.; Shcherbinin, B.

    1977-01-01

    The report gives an account of the problems of the projected development of atomic power and evaluates its role in the fuel and power complex and long-range development of interconnected power systems of the CMEA member countries. The report emphasizes the importance of scientific and technical co-operation in the creation of thermal and fast-neutron power reactors with 1000-1500MW(e) units, and in the elaboration of nuclear plants for heating services. The positive experience of the international scientific and research group of scientists of the CMEA member countries carrying out reactor-physics studies on critical assemblies is mentioned. The report contains basic conclusions from the forecasts for nuclear power in the CMEA member countries up to 1990, including forecasting methodology; the role of nuclear power plants in saving natural and enriched uranium for a projected period; and the impact of nuclear power development rates on its structure (thermal and fast reactor ratio). It lists the impacts of scientific and technical co-operation of the CMEA member countries on the fuel cycle, including the transport of spent nuclear fuel, its recovery, reprocessing and radioactive waste disposal. Particular effects of co-operation of the CMEA member countries on the radiation safety of nuclear power plants and environmental protection are analysed. The report notes the role of the international economic associations Interatomenergo and Interatominstrument in the accelerated development of nuclear power. (author)

  9. Development of TRU transmuters for optimization of the global fuel cycle. Final Report for the NERI Project

    International Nuclear Information System (INIS)

    Lee, John C.

    2009-01-01

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report

  10. Developing Federated Services within Seismology: IRIS' involvement in the CoopEUS Project

    Science.gov (United States)

    Ahern, T. K.; Trabant, C. M.; Stults, M.

    2014-12-01

    As a founding member of the CoopEUS initiative, IRIS Data Services has partnered with five data centers in Europe and the UC Berkeley (NCEDC) in the US to implement internationally standardized web services to access seismological data using identical methodologies. The International Federation of Digital Seismograph Networks (FDSN) holds commission status within IASPEI/IUGG and as such is the international body that governs data exchange formats and access protocols within seismology. The CoopEUS project involves IRIS and UNAVCO as part of the EarthScope project and the European collaborators are all members of the European Plate Observing System (EPOS). CoopEUS includes one work package that attempts to coordinate data access between EarthScope and EPOS facilities. IRIS has worked with its partners in the FDSN to develop and adopt three key international service standards within seismology. These include 1) fdsn-dataselect, a service that returns time series data in a variety of standard formats, 2) fdsn-station, a service that returns related metadata about a seismic station in stationXML format, and 3) fdsn-event, a service that returns information about earthquakes and other seismic events in QuakeML format. Currently the 5 European data centers supporting these services include the ORFEUS Data Centre in the Netherlands, the GFZ German Research Centre for Geosciences in Potsdam, Germany, ETH Zurich in Switzerland, INGV in Rome, Italy, and the RESIF Data Centre in Grenoble France. Presently these seven centres can all be accessed using standardized web services with identical service calls and returns results in standardized ways. IRIS is developing an IRIS federator that will allow a client to seamlessly access information across the federated centers. Details and current status of the IRIS Federator will be presented.

  11. Project Report on Development of a Safeguards Approach for Pyroprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Robert Bean

    2010-09-01

    The Idaho National Laboratory has undertaken an effort to develop a standard safeguards approach for international commercial pyroprocessing facilities. This report details progress for the fiscal year 2010 effort. A component by component diversion pathway analysis has been performed, and has led to insight on the mitigation needs and equipment development needed for a valid safeguards approach. The effort to develop an in-hot cell detection capability led to the digital cloud chamber, and more importantly, the significant potential scientific breakthrough of the inverse spectroscopy algorithm, including the ability to identify energy and spatial location of gamma ray emitting sources with a single, non-complex, stationary radiation detector system. Curium measurements were performed on historical and current samples at the FCF to attempt to determine the utility of using gross neutron counting for accountancy measurements. A solid cost estimate of equipment installation at FCF has been developed to guide proposals and cost allocations to use FCF as a test bed for safeguards measurement demonstrations. A combined MATLAB and MCNPX model has been developed to perform detector placement calculations around the electrorefiner. Early harvesting has occurred wherein the project team has been requested to provide pyroprocessing technology and safeguards short courses.

  12. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  13. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  14. Elaboration of a guide including relevant project and logistic information: a case study

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Tchaikowisky M. [Faculdade de Tecnologia e Ciencias (FTC), Itabuna, BA (Brazil); Bresci, Claudio T.; Franca, Carlos M.M. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    For every mobilization of a new enterprise it is necessary to quickly obtain the greatest amount of relative information in regards to location and availability of infra-structure, logistics, and work site amenities. Among this information are reports elaborated for management of the enterprise, (organizational chart, work schedule, objectives, contacts, etc.) as well as geographic anomalies, social-economic and culture of the area to be developed such as territorial extension, land aspects, local population, roads and amenities (fuel stations ,restaurants and hotels), infra-structure of the cities (health, education, entertainment, housing, transport, etc.) and logistically the distance between cities the estimated travel time, ROW access maps and notable points, among other relevant information. With the idea of making this information available for everyone involved in the enterprise, it was elaborated for GASCAC Spread 2A a rapid guide containing all the information mentioned above and made it available for all the vehicles used to transport employees and visitors to the spread. With this, everyone quickly received the majority of information necessary in one place, in a practical, quick, and precise manner, since the information is always used and controlled by the same person. This study includes the model used in the gas pipeline GASCAC Spread 2A project and the methodology used to draft and update the information. Besides the above, a file in the GIS format was prepared containing all necessary planning, execution and tracking information for enterprise activities, from social communication to the execution of the works previously mentioned. Part of the GIS file information was uploaded to Google Earth so as to disclose the information to a greater group of people, bearing in mind that this program is free of charge and easy to use. (author)

  15. SHynergie: Development of a virtual project laboratory for monitoring hydraulic stimulations

    Science.gov (United States)

    Renner, Jörg; Friederich, Wolfgang; Meschke, Günther; Müller, Thomas; Steeb, Holger

    2016-04-01

    Hydraulic stimulations are the primary means of developing subsurface reservoirs regarding the extent of fluid transport in them. The associated creation or conditioning of a system of hydraulic conduits involves a range of hydraulic and mechanical processes but also chemical reactions, such as dissolution and precipitation, may affect the stimulation result on time scales as short as hours. In the light of the extent and complexity of these processes, the steering potential for the operator of a stimulation critically depends on the ability to integrate the maximum amount of site-specific information with profound process understanding and a large spectrum of experience. We report on the development of a virtual project laboratory for monitoring hydraulic stimulations within the project SHynergie (http://www.ruhr-uni-bochum.de/shynergie/). The concept of the laboratory envisioned product that constitutes a preparing and accompanying rather than post-processing instrument ultimately accessible to persons responsible for a project over a web-repository. The virtual laboratory consists of a data base, a toolbox, and a model-building environment. Entries in the data base are of two categories. On the one hand, selected mineral and rock properties are provided from the literature. On the other hand, project-specific entries of any format can be made that are assigned attributes regarding their use in a stimulation problem at hand. The toolbox is interactive and allows the user to perform calculations of effective properties and simulations of different types (e.g., wave propagation in a reservoir, hydraulic test). The model component is also hybrid. The laboratory provides a library of models reflecting a range of scenarios but also allows the user to develop a site-specific model constituting the basis for simulations. The laboratory offers the option to use its components following the typical workflow of a stimulation project. The toolbox incorporates simulation

  16. Minimizing Investment Risk of Integrated Rail and Transit-Oriented-Development Projects over Years in a Linear Monocentric City

    Directory of Open Access Journals (Sweden)

    Ding Liu

    2016-01-01

    Full Text Available Rail and transit-oriented-development (TOD projects are simultaneously optimized in this paper, with special consideration given to yearly variation and spatial and temporal correlation of population densities. In the proposed model, the objective is to minimize the investment risk of integrated rail and TOD projects with a given required expected return on investment. The investment risk is optimized based on closed-form solutions of the design variables, including rail line length, the number of TOD projects, and the number of housing units in each TOD project. The closed-form solutions are given explicitly under the assumption of social welfare maximization. It is found that underestimation exists for rail and TOD projects without consideration of the correlation of spatial and temporal population densities. TOD projects can greatly improve the return on investment of the rail operator. A numerical example is also presented.

  17. Vehicle to Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

    2010-12-31

    This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

  18. DEVELOPMENT OF METHODOLOGY FOR THE CALCULATION OF THE PROJECT INNOVATION INDICATOR AND ITS CRITERIA COMPONENTS

    Directory of Open Access Journals (Sweden)

    Mariya Vishnevskaya

    2017-12-01

    Full Text Available Two main components of the problem studied in the article are revealed. At the practical level, the provision of the convenient tools allowing a comprehensive evaluation the proposed innovative project in terms of its possibilities for inclusion in the portfolio or development program, and on the level of science – the need for improvement and complementing the existing methodology of assessment of innovative projects attractiveness in the context of their properties and a specific set of components. The research is scientifically applied since the problem solution involves the science-based development of a set of techniques, allowing the practical use of knowledge gained from large information arrays at the initialization stage. The purpose of the study is the formation of an integrated indicator of the project innovation, with a substantive justification of the calculation method, as a tool for the evaluation and selection of projects to be included in the portfolio of projects and programs. The theoretical and methodological basis of the research is the conceptual provisions and scientific developments of experts on project management issues, published in monographs, periodicals, materials of scientific and practical conferences on the topic of research. The tasks were solved using the general scientific and special methods, mathematical modelling methods based on the system approach. Results. A balanced system of parametric single indicators of innovation is presented – the risks, personnel, quality, innovation, resources, and performers, which allows getting a comprehensive idea of any project already in the initial stages. The choice of a risk tolerance as a key criterion of the “risks” element and the reference characteristics is substantiated, in relation to which it can be argued that the potential project holds promise. A tool for calculating the risk tolerance based on the use of matrices and vector analysis is proposed

  19. Technology Cooperation Agreement Pilot Project: Development-Friendly Greenhouse Gas Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Keegan, P.

    1998-10-30

    This paper provides an overview of TCAPP, including the methodology, the results to date, and proposed future activities. It includes a detailed description of the technology cooperation frameworks completed by each country, the process that produced them and the plans for how TCAPP will help to implement the directions articulated by the country teams. The US Government initiated the Technology Cooperation Agreement Pilot Project (TCAPP) in August 1997 in recognition of the need to establish a mechanism for implementing Article 4.5 of the Framework Convention on Climate Change. ''The developed country partners shall take all practicable steps to promote, facilitate and finance, as appropriate, the transfer of, or access to, environmentally sound technologies and know-how to other Parties, particularly developing country Parties, to enable them to implement the provisions of the Convention.'' TCAPP builds support for implementing clean energy technologies by facilitating collaboration among the participating countries, the US and other OECD countries, international donors, and the private sector. The governments of Brazil, China, Kazakhstan, Mexico and the Philippines are currently participating and helping to shape this initiative. International donors and the private sector have also been actively engaged in the design and implementation of this pilot program.

  20. All projects related to | Page 530 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Topic: Internet, CENSORSHIP, FREEDOM OF INFORMATION, FREEDOM OF SPEECH ... a driver of economic growth, social empowerment and citizen engagement. ... to broaden and deepen the impact of IFAD-funded development projects.

  1. A three-year teacher research–to–practice collaborative professional development project

    DEFF Research Database (Denmark)

    Hilton, Annette; Hilton, Geoff; Zeuschner, Michael

    The theme is successful implementation of a research-to-practice collaborative teacher professional development project aimed at enhancing the teaching and learning of proportional reasoning. The objectives are to outline the project goals, provide an overview of the key research findings regardi...

  2. High-school software development project helps increasing students' awareness of geo-hydrological hazards and their risks

    Science.gov (United States)

    Marchesini, Ivan; Rossi, Mauro; Balducci, Vinicio; Salvati, Paola; Guzzetti, Fausto; Bianchini, Andrea; Grzeleswki, Emanuell; Canonico, Andrea; Coccia, Rita; Fiorucci, Gianni Mario; Gobbi, Francesca; Ciuchetti, Monica

    2015-04-01

    In Italy, inundation and landslides are widespread phenomena that impact the population and cause significant economic damage to private and public properties. The perception of the risk posed by these natural geo-hydrological hazards varies geographically and in time. The variation in the perception of the risks has negative consequences on risk management, and limits the adoption of effective risk reduction strategies. We maintain that targeted education can foster the understanding of geo-hydrological hazards, improving their perception and the awareness of the associated risk. Collaboration of a research center experienced in geo-hydrological hazards and risks (CNR IRPI, Perugia) and a high school (ITIS Alessandro Volta, Perugia) has resulted in the design and execution of a project aimed at improving the perception of geo-hydrological risks in high school students and teachers through software development. In the two-year project, students, high school teachers and research scientists have jointly developed software broadly related to landslide and flood hazards. User requirements and system specifications were decided to facilitate the distribution and use of the software among students and their peers. This allowed a wider distribution of the project results. We discuss two prototype software developed by the high school students, including an application of augmented reality for improved dissemination of information of landslides and floods with human consequences in Italy, and a crowd science application to allow students (and others, including their families and friends) to collect information on landslide and flood occurrence exploiting modern mobile devices. This information can prove important e.g., for the validation of landslide forecasting models.

  3. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  4. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    International Nuclear Information System (INIS)

    Joseph, Shijo; Sunderlin, William D; Verchot, Louis V; Herold, Martin

    2013-01-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 REDD+ projects in Brazil, Peru, Cameroon, Tanzania, Indonesia and Vietnam, using a questionnaire survey and field visits. Nineteen performance criteria with 76 indicators were formulated in three categories, and capacity was measured with respect to each category. Of the 20 projects, 11 were found to have very high or high overall MRV capacity and readiness. At the regional level, capacity and readiness tended to be highest in the projects in Brazil and Peru and somewhat lower in Cameroon, Tanzania, Indonesia and Vietnam. Although the MRV capacities of half the projects are high, there are capacity deficiencies in other projects that are a source of concern. These are not only due to limitations in technical expertise, but can also be attributed to the slowness of international REDD+ policy formulation and the unclear path of development of the forest carbon market. Based on the study results, priorities for MRV development and increased investment in readiness are proposed. (letter)

  5. Composting projects under the Clean Development Mechanism: Sustainable contribution to mitigate climate change

    International Nuclear Information System (INIS)

    Rogger, Cyrill; Beaurain, Francois; Schmidt, Tobias S.

    2011-01-01

    The Clean Development Mechanism (CDM) of the Kyoto Protocol aims to reduce greenhouse gas emissions in developing countries and at the same time to assist these countries in sustainable development. While composting as a suitable mitigation option in the waste sector can clearly contribute to the former goal there are indications that high rents can also be achieved regarding the latter. In this article composting is compared with other CDM project types inside and outside the waste sector with regards to both project numbers and contribution to sustainable development. It is found that, despite the high number of waste projects, composting is underrepresented and a major reason for this fact is identified. Based on a multi-criteria analysis it is shown that composting has a higher potential for contribution to sustainable development than most other best in class projects. As these contributions can only be assured if certain requirements are followed, eight key obligations are presented.

  6. Research, development and demonstration in the energy area in Switzerland - List of projects 2000/2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report prepared by the Swiss Federal Office of Energy (SFOE) reviews research, development and demonstration projects in the energy area that were partly or wholly supported by the Swiss Federation in the years 2000/2001. A list of over 1,000 projects is presented, whereby many projects supported by the Swiss Cantons and local authorities are not included in the statistics. The report also contains figures on the efforts made by the private economy in these areas. The classification of the projects in the four main areas 'efficient use of energy', 'renewable energy sources', 'nuclear energy' and 'energy economics' is presented. This allows comparison with other publications such as the Federal Energy-Research Concept or the Overviews of the Energy-Research Programme Managers. The classification system is also compared with that used by the International Energy Agency (IEA). The Network for Information and Technology Transfer (ENET) is also presented, which has a comprehensive data base at its disposal and which maintains a systematic collection of energy-relevant publications. Details on these projects can be obtained from the appropriate heads of programmes and SFOE departmental heads, whose addresses are given in the report

  7. Regional Development and Management of Sunk Capital: Some Issues in Project Evaluation

    OpenAIRE

    Gyles, Oliver

    1995-01-01

    Government intervention aimed at regional development can be justified where there are opportunities for profitable investement of public funds. Benefit: cost analysis can be an effective tool for economic evaluation of regional development project proposals, providcd the distinction between sunk costs and historical outlays is recognised. Because the cost of previous development is sunk, it is appropriate to value existing assets at their opportunity cost. In terms or ex ante project apprais...

  8. Software development project success and failure from the supplier's perspective: A systematic literature review

    OpenAIRE

    Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita

    2012-01-01

    peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...

  9. Professional Development for Researchers in Solid Earth Science Evolved to Include Scientific and Educational Content

    Science.gov (United States)

    Eriksson, S. C.; Arrowsmith, R.; Olds, S. E.

    2011-12-01

    Integrated measures of crustal deformation provide valuable insight about tectonic and human-induced processes for scientists and educators alike. UNAVCO in conjunction with EarthScope initiated a series of short courses for researchers to learn the processing and interpretation of data from new technologies such as high precision GPS, Strainmeter, InSar and LiDAR that provide deformation information relevant to many geoscience sub-disciplines. Intensive short courses of a few days and the widespread availability of processed data through large projects such as EarthScope and GEON enable more geoscientists to incorporate these data into diverse projects. Characteristics of the UNAVCO Short Course Series, reaching over 400 participants since 2005, include having short course faculty who have pioneered development of each technology; open web-access to course materials; processing software installed on class-ready computers; no course fees; scholarships for students, post-doctoral fellows, and emerging faculty when needed; formative evaluation of the courses; community-based decisions on topics; and recruitment of participants across relevant geoscience disciplines. In 2009, when EarthScope airborne LiDAR data became available to the public through OpenTopographhy, teaching materials were provided to these researchers to incorporate the latest technologies into teaching. Multiple data sets across technologies have been developed with instructions on how to access the various data sets and incorporate them into geological problem sets. Courses in GPS, airborne LiDAR, strainmeter, and InSAR concentrate on data processing with examples of various geoscience applications. Ground-based LiDAR courses also include data acquisition. Google Earth is used to integrate various forms of data in educational applications. Various types of EarthScope data can now be used by a variety of geoscientists, and the number of scientists who have the skills and tools to use these various

  10. Plutonium Immobilization Project - Can-In-Canister Hardware Development/Selection

    International Nuclear Information System (INIS)

    Hamilton, L.

    2001-01-01

    The Plutonium Immobilization Project (PIP) is a program funded by the U.S. Department of Energy to develop technology to disposition excess weapons grade plutonium. This program introduces the ''Can-in-Canister'' (CIC) technology that immobilizes the plutonium by encapsulating it in ceramic forms (or pucks) and ultimately surrounding it with high-level waste glass to provide a deterrent to recovery. Since there are significant radiation, contamination and security concerns, the project team is developing unique technologies to remotely perform plutonium immobilization tasks. This paper covers the design, development and testing of the magazines (cylinders containing cans of ceramic pucks) and the rack that holds them in place inside the waste glass canister. Several magazine and rack concepts were evaluated to produce a design that gives the optimal balance between resistance to thermal degradation and facilitation of remote handling. This paper also reviews the effort to develop a jointed arm robot that can remotely load seven magazines into defined locations inside a stationary canister working only through the 4 inch (102 mm) diameter canister throat

  11. Plutonium Immobilization Project - Can-In-Canister Hardware Development/Selection

    International Nuclear Information System (INIS)

    Hamilton, L.

    2001-01-01

    The Plutonium Immobilization Project (PIP) is a program funded by the U.S. Department of Energy to develop technology to disposition excess weapons grade plutonium. This program introduces the ''Can-in-Canister'' (CIC) technology that immobilizes the plutonium by encapsulating it in ceramic forms (or pucks) and ultimately surrounding it with high-level waste glass to provide a deterrent to recovery. Since there are significant radiation, contamination and security concerns, the project team is developing unique technologies to remotely perform plutonium immobilization tasks. This paper covers the design, development and testing of the magazines (cylinders containing cans of ceramic pucks) and the rack that holds them in place inside the waste glass canister. Several magazine and rack concepts were evaluated to produce a design that gives the optimal balance between resistance to thermal degradation and facilitation of remote handling. This paper also reviews the effort to develop a join ted arm robot that can remotely load seven magazines into defined locations inside a stationary canister working only through the 4 inch (102 mm) diameter canister throat

  12. All projects related to | Page 132 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project will analyze three state institutions in Tunisia, Egypt, and Yemen - the ... state-controlled religious institutions, and state-owned media - to assess the ... POLICY MAKING, MIDDLE EAST, Civil society, SOCIAL DEVELOPMENT.

  13. Project Management in Development Aid Industry – Public vs. Private

    Directory of Open Access Journals (Sweden)

    Simović Dragana

    2015-02-01

    Full Text Available This article examines the relationship between the type of a development aid implementing organisation (public or private and the quality of project management in development aid. The author begins with main public administration considerations - how public aid administration is different from private and furthermore, how particular sectoral characteristics of organisations influence the quality of the management process. The article combines empirical findings on the differences between the public and private sector with a complex setting of development aid and main success factors in development aid activity, in order to determine whether for-profit or public companies are more likely to achieve better project management processes. The article identifies some indices that favorise private companies, and outlines further necessary steps that should be taken in order to broaden the argumentation and confirm or reject this assertion

  14. Identification of remediation needs and technology development focus areas for the Environmental Restoration (ER) Project at Sandia National Laboratories/New Mexico (SNL/NM)

    International Nuclear Information System (INIS)

    Tucker, M.D.

    1995-06-01

    The Environmental Restoration (ER) Project has been tasked with the characterization, assessment, remediation and long-term monitoring of contaminated waste sites at Sandia National Laboratories/New Mexico (SNL/NM). Many of these sites will require remediation which will involve the use of baseline technologies, innovative technologies that are currently under development, and new methods which will be developed in the near future. The Technology Applications Program (TAP) supports the ER Project and is responsible for development of new technologies for use at the contaminated waste sites, including technologies that will be used for remediation and restoration of these sites. The purpose of this report is to define the remediation needs of the ER Project and to identify those remediation needs for which the baseline technologies and the current development efforts are inadequate. The area between the remediation needs and the existing baseline/innovative technology base represents a technology gap which must be filled in order to remediate contaminated waste sites at SNL/NM economically and efficiently. In the first part of this report, the remediation needs of the ER Project are defined by both the ER Project task leaders and by TAP personnel. The next section outlines the baseline technologies, including EPA defined Best Demonstrated Available Technologies (BDATs), that are applicable at SNL/NM ER sites. This is followed by recommendations of innovative technologies that are currently being developed that may also be applicable at SNL/NM ER sites. Finally, the gap between the existing baseline/innovative technology base and the remediation needs is identified. This technology gap will help define the future direction of technology development for the ER Project

  15. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  16. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  17. The development of a wood fuel gasification plant utilising short rotation coppice and forestry residues: project ARBRE

    International Nuclear Information System (INIS)

    Pitcher, K.F.; Lundbergt, H.

    1997-01-01

    This paper will discuss the development of ARBRE Energy, a joint venture company that includes Yorkshire Environmental of the United Kingdom and Tenniska Processer AB of Sweden. The project will establish 2000 hectares of short rotation coppices, some of which will be organically fertilized with digested sewage sludges, to provide 80% of the fuel requirements of a biomass integrated gasification combined cycle (BIGCC) electricity generation plant. The remaining 20% of the fuel requirements will come from forestry waste, although in the first 5 years all the fuel will come from the forestry sources until the coppices are mature. The project will construct a gasification plant at Eggborough, North Yorkshire, England, which will provide gas to a gas turbine and steam turbine generation system, producing 10 MW and exporting 8 MW of electricity. It has been included in the 1993 tranche of the UK's Non Fossil Fuel Obligation (NFFO) and has gained financial support from the European Commission's THERMIE programme as a targeted BIGCC project. The project's technical and environmental effects and benefits will be examined in detail, together with the award of its planning permit and agreement on its operating license. (author)

  18. Meeting the challenges of developing LED-based projection displays

    Science.gov (United States)

    Geißler, Enrico

    2006-04-01

    The main challenge in developing a LED-based projection system is to meet the brightness requirements of the market. Therefore a balanced combination of optical, electrical and thermal parameters must be reached to achieve these performance and cost targets. This paper describes the system design methodology for a digital micromirror display (DMD) based optical engine using LEDs as the light source, starting at the basic physical and geometrical parameters of the DMD and other optical elements through characterization of the LEDs to optimizing the system performance by determining optimal driving conditions. LEDs have a luminous flux density which is just at the threshold of acceptance in projection systems and thus only a fully optimized optical system with a matched set of LEDs can be used. This work resulted in two projection engines, one for a compact pocket projector and the other for a rear projection television, both of which are currently in commercialization.

  19. Perceived Benefits of National Fadama Development Project III ...

    African Journals Online (AJOL)

    The study was conducted to appraise the perceived benefits of third national fadama development project III among rural farmers in Kwara state, Nigeria. A multi-stage random sampling technique was employed in selecting 225 Fadama III users as respondents. Data were collected by well trained fadama community ...

  20. Impacts of commercial agricultural development project (CADP) on ...

    African Journals Online (AJOL)

    The study evaluates the impacts of the Commercial Agricultural Development Project (CADP) on the empowerment of farmers in Kaduna State with specific reference to Lere, Giwa and Kubau Local Government Areas for the period of 2010-2016. Survey and documentary research design were employed and data sourced ...