WorldWideScience

Sample records for project included work

  1. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  2. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  3. Problem-Oriented Project Work

    DEFF Research Database (Denmark)

    Olsen, Poul Bitsch; Pedersen, Nils Kaare

    This book is meant to support problem-oriented learning activities. Problem-orientation concerns the reasoning about lack of knowledge, while project work includes the ethnomethods that are practiced when collectives produce scientific knowledge. This book reflects particular methods related...

  4. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  5. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  6. Restucturing the Project Work Format

    DEFF Research Database (Denmark)

    Dupont, Søren

    2015-01-01

    The chapter is based on an evaluation of a pedagogical experiment at Roskilde University, the Antology Experiment. The objective of the experiment was to develop and expand the framework for project work through the production of anthologies compiled collectively by a number of project groups....... The novel aspects of the Anthology Experiment were most notably its magnitude and complexity. In this experiment the groups were totalling some 50 students who were working together. The experiment used a well-known publishing format from research, namely the anthology form, which usually focuses...... on a specific research topic and includes contributions from various researchers. In the Anthology Experiment, the project groups could be viewed as ‘research units’ that produce the contributions to the anthology. The complexity of the experiment offered challenges, both for students and supervisors...

  7. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  8. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    -study, whereas the project study form is based on collaboration and dialogue. Consequently, successful implementation of project work in distance education requires extensive utilisation of new information and communication technology. In this paper the experiences of project work in a new Master of Industrial...... devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons...

  9. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  10. Teaching mathematical modelling through project work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2006-01-01

    are reported in manners suitable for internet publication for colleagues. The reports and the related discussions reveal interesting dilemmas concerning the teaching of mathematical modelling and how to cope with these through “setting the scene” for the students modelling projects and through dialogues......The paper presents and analyses experiences from developing and running an in-service course in project work and mathematical modelling for mathematics teachers in the Danish gymnasium, e.g. upper secondary level, grade 10-12. The course objective is to support the teachers to develop, try out...... in their own classes, evaluate and report a project based problem oriented course in mathematical modelling. The in-service course runs over one semester and includes three seminars of 3, 1 and 2 days. Experiences show that the course objectives in general are fulfilled and that the course projects...

  11. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  12. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons....... As the experience since then has proven this to be a very successful innovation in higher education [1], it seems to be an obvious idea also to base our new distance educations on the project study form. Traditionally, however, distance education has been characterized by one-way communication and self...

  13. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  14. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  15. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  16. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  17. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  18. Interdisciplinary Problem Oriented Project Work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2018-01-01

    In this chapter, we analyze the problem oriented project work practiced at the Bachelor Study Program in Natural Science (Nat Bach) at Roskilde University (RU) as a learning environment for developing students’ mathematical modelling competence. The projects are conducted in a rather sophisticated...... and radical learning environment grounded on the four pedagogical key principles of, problem orientation, participant directed group work, interdisciplinarity and exemplarity. We illustrate and discuss the interplay between the aim of developing the students’ modelling competence on the one hand...

  19. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  20.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  1. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  2. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  3. Group Organized Project Work in Distance Education

    DEFF Research Database (Denmark)

    Helbo, Jan; Knudsen, Morten; Jensen, Lars Peter

    2001-01-01

    Project organized problem based learning is a successful concept for on-campus education at Aalborg University. Recently this "Aalborg concept" has been used in networked distance education as well. This paper describes the experiences from two years of Internet-mediated project work in a new...... Master of Information Technology education. The main conclusions are, that the project work is a strong learning motivator, enhancing peer collaboration, for off-campus students as well. However, the concept cannot be directly transferred to off-campus learning. The main reasons are that the students...... must communicate electronically, and that they are under a fierce time strain, studying part time and typically with a full time job and a family. In this paper, the main problems experienced with group organized project work in distance education are described, and some possible solutions are listed...

  4. Legacy material work-off project

    International Nuclear Information System (INIS)

    Sloan, T.J.; Baker, D.H. IV

    1999-01-01

    Los Alamos National Laboratory (LANL) and its subcontractors recently completed a nine-month legacy material clean-up effort. Legacy materials were defined as chemicals, hazardous, non-hazardous, and both hazardous and radioactive (mixed), that no longer served a programmatic use and had no identified individual owner within the Laboratory. Once personnel identified the legacy materials, the items were transferred to Solid Waste Operation's (EM-SWO) control. Upon completing this process, the responsible division-level manager was required to certify that all non-radioactive hazardous and non-hazardous materials and acceptable mixed legacy materials had been identified and transferred to EM-SWO for proper handling or disposal. The major expense in this project was the cost of actual chemical and radiological analysis. This expense was the result of items not having an identified individual owner. The major benefit of this project is that LANL is now in an excellent position to implement its Integrated Safety Management (ISM) Plan, which requires the implementation of safe work practices, including requirements for removing unused items when vacating workspaces. Effective implementation of ISM will go a long way toward ensuring that legacy materials are no longer an issue at the Laboratory

  5. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  6. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  7. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  8. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  9. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  10. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  11. Dust as a Working Fluid for Heat Transfer Project

    Science.gov (United States)

    Mantovani, James G.

    2015-01-01

    The project known as "Dust as a Working Fluid" demonstrates the feasibility of a dust-based system for transferring heat radiatively into space for those space applications requiring higher efficiency, lower mass, and the need to operate in extreme vacuum and thermal environments - including operating in low or zero gravity conditions in which the dust can be conveyed much more easily than on Earth.

  12. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  13. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem...

  14. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...

  15. Work Breakdown Structures The Foundation for Project Management Excellence

    CERN Document Server

    Norman, Eric S; Fried, Robert T

    2011-01-01

    Understand and apply new concepts regarding Work Breakdown Structures The Work Breakdown Structure (WBS) has emerged as a foundational concept and tool in Project Management. It is an enabler that ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool. Created by the three experts who led the development of PMI's Practice Standard for Work Breakdown Structures, Second Edition, this much-needed text expands on what the standard covers and describes how to go about successfully implementing the WBS within the project life

  16. Constructing new working practices through project narratives

    NARCIS (Netherlands)

    Veenswijk, M.B.; Berendse, M.

    2008-01-01

    In this article we focus on the (internal and external) dynamics of New Public Management (NPM) in the daily life of project management. We concentrate on the ways NPM concepts work out in the realities of project actors. Based on recent research within the Dutch infrastructure sector, we analyse

  17. Service user integration into social work education: lessons learned from nordic participatory action projects.

    Science.gov (United States)

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education.

  18. Project Work in Social Biology at GCE Advanced Level

    Science.gov (United States)

    Gadd, P.; Smith, S. Tyrell

    1977-01-01

    The system by which projects are submitted, modified, and approved is outlined and an indication is given of the standards and quantity of work expected. Criteria on which assessment is based are explained, the range of individual studies is summarized, and cases for and against project work are given. (Author/AJ)

  19. Conceptual design statement of work for the immobilized low-activity waste disposal facility, project W-520

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1998-01-01

    This Statement of Work outlines the deliverables and schedule for preparation of the Project W-520 Conceptual Design Report, including, work plans, site development plan, preliminary safety evaluation, and conceptual design

  20. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  1. Does assessing project work enhance the validity of qualifications? The case of GCSE coursework

    Directory of Open Access Journals (Sweden)

    Victoria Crisp

    2009-03-01

    Full Text Available This paper begins by describing current views on validity and how certain assessment forms, such as school-based project work, may enhance validity. It then touches on debates about the dependability of assessment by teachers. GCSEs and GCSE coursework are then described along with the reasons for the inclusion of coursework in many GCSEs. Crooks, Kane and Cohen’s (1996 chain model of eight linked stages of validity enquiry is then used as a structure within which to consider the validity of project work assessments, and specifically GCSE coursework assessment, drawing on the available literature. Strengths for validity include the ability to assess objectives that are difficult to test in written examinations, promoting additional skills such as critical thinking, creativity and independent thinking, and improving motivation. Possible threats to validity include the potential for internet and other types of plagiarism, tasks becoming overly structured and formulaic thus reducing the positive impact on learning, and the potentially heavy workload for teachers and students. The paper concludes by describing current policy changes in the UK with regard to GCSE coursework and relates this to strong and weak validity links for project work as a mode of assessment.

  2. Evaluation of the Work-Place Cooperative Project in Geography Degrees at the University of Leeds.

    Science.gov (United States)

    Hogg, James

    1998-01-01

    Describes the context and objective of a Work-Place Cooperative Project (WPCP) established in the School of Geography at the University of Leeds in 1995. The project presents students with business, commerce, industry, and environmental research issues that have geographical dimensions. Includes a number of examples from the WPCP. (MJP)

  3. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  4. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  5. 49 CFR 30.13 - Restrictions on Federal public works projects: Certification.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects... WORKS CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.13 Restrictions on Federal public works projects: Certification. As prescribed...

  6. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  7. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  8. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  9. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  10. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 . The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF 6 -emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from solvent use and other sources is included

  11. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  12. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  13. Collaborative Projects: A Study of Paired Work in a Malaysian University.

    Science.gov (United States)

    Holmes, Richard

    2003-01-01

    Examines the project work of university students in a TESOL (Teaching of English as a Second Language) program in Malaysia. Compares phonetics and phonology projects completed by students working in pairs with those completed by students alone and reports student attitudes and strategies. (Author/LRW)

  14. Infusing and sustaining aging content in social work education: findings from GeroRich projects.

    Science.gov (United States)

    Hash, Kristina M; Gottlieb, Jody; Harper-Dorton, Karen V; Crawley-Woods, Geraldine; Shelek-Furbee, Katherine; Smith, John David; Brown, Rita

    2007-01-01

    This article presents findings from experiences of 67 projects involved in GeroRich, an initiative funded by the John A. Hartford Foundation designed to infuse, enrich and sustain aging content in BSW and MSW curricula. Thematic qualitative analysis was used to uncover themes in answers to open-ended questions contained in End-of-Year 2 project reports. Content areas addressed by open-ended answers were: (1) successes and innovations, and (2) challenges requiring responses. Primary successes and innovations identified were as follows: curriculum enrichment, faculty and student involvement, student-learning activities and community. Challenges to be responded to were identified as lack of faculty involvement, competing demands on faculty and programs, and sustainability of project efforts. Examples of strategies implemented to overcome these obstacles include providing teaching resources, instituting financial and other supports, and developing strategic plans for sustaining content infusion post-funding. Experiences of the GeroRich projects offer practical considerations for other social work programs that accept the challenge of attracting and preparing students to work with the increasing population of older adults.

  15. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Science.gov (United States)

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  16. Projects for increasing job satisfaction and creating a healthy work environment.

    Science.gov (United States)

    Brunges, Michele; Foley-Brinza, Christine

    2014-12-01

    Workplace culture is one of the biggest factors driving employee commitment and engagement. Multiple studies have shown that hospitals will perform better over time if employees are committed to their jobs and engaged in what they do. By creating and implementing multiple projects during a three-year period, a team at the University of Florida Health Shands Hospital, Gainesville, increased job satisfaction. Projects included ensuring meal breaks were offered, creating a serenity area, developing the patient ambassador role, actively addressing bullying and unprofessional behavior, assigning a student mentee to work with staff members on culture change, offering regular fun activities, redesigning the unit, reorganizing schedules to reduce stress, implementing education and training initiatives, establishing a Unit Practice Council, and implementing reward and recognition programs. Survey results and anecdotal evidence suggest that these projects combined to increase employee satisfaction and employee retention rates. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  17. Fundamental Aeronautics Program: Overview of Project Work in Supersonic Cruise Efficiency

    Science.gov (United States)

    Castner, Raymond

    2011-01-01

    The Supersonics Project, part of NASA?s Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2011) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  18. CRITICAL TEACHING WORK AS DIMENSION OF UNIVERSITY PROJECT

    Directory of Open Access Journals (Sweden)

    Roberto Leher

    2014-06-01

    Full Text Available The article analyzes the heteronomy of academic work in Brazil, particularly public higher education. It discusses the meaning of rupture of the national-developmentalist project by the irruption of the corporate-military coup and the combined process of coercion (AI-5/1968 and Decree 477/1969 and of the subordination of research and postgraduate studies to monopolistic capitalism in counterreformation of 1968, through programs to encourage science and technology geared to the concerns of bourgeois fractions that sustained the regime. Facing the processes of dispossession and alienation of academic work in the dictatorship, the study examines the organization of teaching movement, its first strikes and the centrality given to career university project of ANDES. Finally, it presents as deepening the dependent capitalism over the last three decades reoriented public university and private higher education, indicating effects on teaching work and the struggles for affirmation of the public sphere as antimercantile.

  19. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  20. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  1. Mirage project. Second summary progress report (Work period January to December 1984)

    International Nuclear Information System (INIS)

    Come, B.

    1985-01-01

    This report summarizes the second year of work (1984) in the CEC project MIRAGE on migration of radionuclides in the geosphere. It complements CEC reports EUR 9304 (Description of the project) and EUR 9543 (Works carried out in 1983) on the same topic

  2. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    Science.gov (United States)

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following

  3. Overview of the ACEX project iodine work

    International Nuclear Information System (INIS)

    Merilo, M.

    1996-01-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. The results of this work are expected to identify where additional data

  4. Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    Simonsen, J. (2006): Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens, Paper presented at the PDC 2006 workshop on: Reconfiguring Healthcare: Issues in Computer Supported Cooperative Work in Healthcare Environments. Participatory Design Conference, Trento, Italy, August...

  5. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  6. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  7. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  8. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  9. Topical and working papers on nuclear power capacity projections

    International Nuclear Information System (INIS)

    As a part of the overall work programme of WG. 1, Sub-Group 1A/2A was formed jointly with WG. 2 and given the responsibility for estimating the growth of nuclear power up to the year 2025 and the associated demands for nuclear fuels, heavy water, enrichment and other fuel cycle services. In carrying out the first part of its task, the estimation of nuclear power capacity growth, sub-Group 1A/2A prepared 6 working papers which contain the following information: A critique of recent world energy demand forecasts; world energy demand and installed capacity to the year 2025; nuclear power growth projections 1977-2000 for developing countries; long range world nuclear power growth projections; INFCE forecasts of nuclear generating capacity 1985-2025

  10. Student-Identified Strengths and Challenges of Using Blackboard for Group Projects in a Social Work Course

    Directory of Open Access Journals (Sweden)

    Melissa B. Littlefield

    2002-05-01

    Full Text Available Blackboard (TM provides social work educators integrated online communication tools that they can employ to facilitate student learning through features such as e-mail, discussion forums, file exchange, virtual classroom, and links to online resources. This study describes students’ experiences using Blackboard (TM to support a group project assignment. The majority of students found it easy to use and useful for the project, and indicated that they would like to use it in other courses. In addition, students gained technical skills as a result of the group project. Students’ group project grades and final course grades were comparable to those in other sections of the same course taught by this investigator. The findings of this study suggest that online technology can be used to facilitate group assignments for MSW students. The benefits include increased efficiency of group functioning and increased accountability of group members. The challenges include technical problems and student resistance to using the technology.

  11. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  12. Why Phishing Works: Project for an Information Security Capstone Course

    Science.gov (United States)

    Pollacia, Lissa; Ding, Yan Zong; Yang, Seung

    2015-01-01

    This paper presents a project which was conducted in a capstone course in Information Security. The project focused on conducting research concerning the various aspects of phishing, such as why phishing works and who is more likely to be deceived by phishing. Students were guided through the process of conducting research: finding background and…

  13. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    Kazakhstan takes part in ITER project in partnership with Russian Federation since the year of 1994. At present the technical stage of the project is completed and ITER Council should take a decision on the site for international reactor. Four countries such as Canada, Japan, Spain and France have offered their territories for being used as site for launching ITER construction. ITER partners started preparing new international agreement that will cover activities on construction, operation and decommissioning of ITER. It will also include the list of research and experimental work that is conducted in support of ITER project. Kazakhstan has already made an important contribution into technical stage realization of ITER project due to scientific and technical researches conducted by National Nuclear Center, by Institute of Experimental and Theoretical Physics and by JSC 'Ulba Metallurgical plant' ('UMP'). Research activity carried out for the support of ITER project is performed in accordance with the following main trends: Tritium safety (permeability and retentin of hydrogen isotopes during in-pile irradiation in various structural materials, co-deposed layers and protective coatings); Verification of computer codes (LOCA type) loss of coolant accidents modeling in ITER reactor; Investigation of liquid metal blanket of thermonuclear reactor (tritium production in lithium containing eutectics Li17Pb83 and ceramics Li 2 TiO 3 , study of tritium permeability). At present the working group of ITER project participants started introducing proposals for cost distribution and for placing the orders on reactor construction. Further Kazakhstan participation in ITER project may be in manufacturing high-tech parts and assemblies from commercial grades of beryllium. They will be used for armouring the reactor first wall, for its thermal protection and for protection of superconductor's components for magnetic systems that are at JSC U MP'. Scientific and technical support of

  14. Working Group 7.0 Environmental Transport and Health Effects, Chernobyl Studies Project. Progress report, October 1994 -- March 1995

    International Nuclear Information System (INIS)

    Anspaugh, L.R.; Hendrickson, S.M.

    1995-01-01

    This document presents the details from the working group 7.0 Chernobyl Studies Project. This working group looked at the environmental transport and health effects from the fallout due to the meltdown of Chernobylsk-4 reactor. Topics include: hydrological transport; chromosome painting dosimetry; EPR, TL and OSL dosimetry; stochastic effects; thyroid studies; and leukemia studies

  15. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    OpenAIRE

    Junwei Zheng; Guangdong Wu

    2018-01-01

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizati...

  16. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  17. Championing mental health at work: emerging practice from innovative projects in the UK.

    Science.gov (United States)

    Robinson, Mark; Tilford, Sylvia; Branney, Peter; Kinsella, Karina

    2014-09-01

    This paper examines the value of participatory approaches within interventions aimed at promoting mental health and wellbeing in the workplace. Specifically the paper explores data from the thematic evaluation of the Mental Health and Employment project strand within the Altogether Better programme being implemented in England in the Yorkshire and Humber region, which was funded through the BIG Lottery and aimed to empower people across the region to lead better lives. The evaluation combined a systematic evidence review with semi-structured interviews across mental health and employment projects. Drawing on both evaluation elements, the paper examines the potential of workplace-based 'business champions' to facilitate organizational culture change within enterprises within a deprived regional socio-economic environment. First, the paper identifies key policy drivers for interventions around mental health and employment, summarizes evidence review findings and describes the range of activities within three projects. The role of the 'business champion' emerged as crucial to these interventions and therefore, secondly, the paper examines how champions' potential to make a difference depends on the work settings and their existing roles, skills and motivation. In particular, champions can proactively coordinate project strands, embed the project, encourage participation, raise awareness, encourage changes to work procedures and strengthen networks and partnerships. The paper explores how these processes can facilitate changes in organizational culture. Challenges of implementation are identified, including achieving leverage with senior management, handover of ownership to fellow employees, assessing impact and sustainability. Finally, implications for policy and practice are discussed, and conclusions drawn concerning the roles of champions within different workplace environments. © The Author (2013). Published by Oxford University Press. All rights reserved. For

  18. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...

  19. Oil field rejuvenation work starts at 14 project sites

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  20. Keynote presentation: Project Management, Technology and Evolving Work Processes

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    not be used in the workplace when students graduate, but rather on the ”engine” of problem solving and communication strategies which drives projects and affects project success from the stakeholders point of view. Once students understand the engine, they are able to not only use software tools...... management documents looked like, but also how these documents are interconnected and work together to solve a problem. In addition, as they were in communication with a real client, they needed to work iteratively, ch anging their understanding of the problem, which in turn changed their options for solving...... the problem as well as planning and communicating the solution. This dynamic participation in problem solving helped students gain experience beyond recognition and reproduction  Campus Encounters – Bridging Learners Conference “Developing Competences for Next Generation Service Sectors” April 13–14, 2011...

  1. The Application of Neutron and X-Ray Techniques to Analyze Works of Art: Examples from The Unvarnished Truth Project

    Science.gov (United States)

    MacDonald, Brandi Lee

    2017-01-01

    When considered as an object, a painting consists of multiple components that, when analyzed together, have a unique story to tell about the artist, their practice, and the history of the work of art. Techniques traditionally applied in physics, including neutron-, x-radiographic and near-infrared imaging, and surface elemental analysis via x-ray fluorescence, are useful for generating significant insight into works of art. By examining the supporting material, grounds, pigments, and varnishes that a painter chose to utilize, we generate new knowledge regarding the composition, context, and decision-making involved in the creation of a work. The project `The Unvarnished Truth: exploring the material history of paintings' is an interdisciplinary initiative that incorporated the expertise of forensic art historians, conservation scientists, physicists, and biomedical engineers. Through the technical analysis of nine paintings from the McMaster Museum of Art permanent collection, we explored research questions related to painting technique, attribution, authenticity, connoisseurship, and object condition and stability. The paintings span over 500 years of European art history, and include works from Vincent Van Gogh, Alexander Rodchenko, and A. van der Neer. This project highlights the multitude of ways in which micro- and non-destructive methods can be used to answer art historical questions. This project is supported by grants from Canadian Heritage and Ontario Arts Council.

  2. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals.

    Science.gov (United States)

    Zheng, Junwei; Wu, Guangdong

    2018-02-15

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility.

  3. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    Science.gov (United States)

    2018-01-01

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility. PMID:29462860

  4. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2018-02-01

    Full Text Available Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility.

  5. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  6. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  7. The rationale for selecting the method of calculation of project products coast (works, services

    Directory of Open Access Journals (Sweden)

    O. V. Molchanova

    2017-01-01

    Full Text Available In modern conditions of management it is necessary to develop a number of recommendations on the introduction of management accounting at state-owned enterprises that carry out revenue-generating activities or based on the right of economic management. It is necessary to apply the correct cost-accounting method for the production of products, works, services for a more rational calculation of the cost price. This will allow management personnel to receive timely objective information about their cost price, identify the feasibility of production and sales, justify the assortment, plan profits. The procedure for determining the cost price of the project products (works, services in the theory and practice of the state enterprise of the Astrakhan region “Kasprybproekt” is investigated in the work. With the existing practice of planning in design organizations, the planned cost price of design and survey works for established cost items is planned in the cost estimate for production by the design organization as a whole and by the types of work: design, survey and others, without subdividing it by orders (projects. According to this, accounting of the actual costs for work in the design organizations is based. The study showed that the state enterprise of the Astrakhan region “Kasprybproyekt” performs different projects with different execution periods; therefore, it is advisable to use one method of calculating the cost price - job (order costing method, and link it to the responsibility centers depending on the department of the performer. Based on the research of the used method to the cost price calculate of the project products (works, services in the state enterprise of the Astrakhan region “Kasprybproekt”, it was proposed to use the job (order costing method that allows to detail all the project costs without distorting the final financial result and optimize the project costs. If the calculation method is correctly determined

  8. Work Breakdown Structure (WBS) Handbook

    Science.gov (United States)

    2010-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  9. 25 CFR 170.915 - May tribal employment taxes or fees be included in an IRR project budget?

    Science.gov (United States)

    2010-04-01

    ... Preference § 170.915 May tribal employment taxes or fees be included in an IRR project budget? Yes. The cost of tribal employment taxes or fees may be included in the budget for an IRR program or project... 25 Indians 1 2010-04-01 2010-04-01 false May tribal employment taxes or fees be included in an IRR...

  10. How is the artist role affected when artists are participating in projects in work life?

    Science.gov (United States)

    Stenberg, Henrik

    2016-01-01

    In Sweden, during the last decade, the artist has come to function as a creative resource in workplaces. There are two organisations, Skiss (Contemporary Artist in the Contemporary Society) and Airis (Artist in Residence), that organise projects for artists and coworkers. These projects are intended to have a positive effect on the well-being of organisations and their employees through artistic means, and the artist often focuses on the social interaction between the employees in their work. The artists' work involves frequent interaction with coworkers. The aim of this article was to describe how visual artists' roles as artists are affected by their engagement in artistic and social projects at workplaces in Sweden. The focus in the article is on the social interaction between artists and employees. The study is a qualitative narrative interview study with fine artists participating in different projects in work life. Since the artist's intervention is usually directed towards social relations in the workplaces, a social perspective on well-being is from a micro-sociological point of view. The categories in the interviews were how the artists worked with the projects, how the social interaction between artists and coworkers worked out, and how the artists evaluated the projects in relation to their ambitions. The results show that, many times, the artistic projects promote well-being in organisations and to some extent benefit the artist, but that the ability of the artists to actually function as artists can be problematic.

  11. Elaboration of a guide including relevant project and logistic information: a case study

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Tchaikowisky M. [Faculdade de Tecnologia e Ciencias (FTC), Itabuna, BA (Brazil); Bresci, Claudio T.; Franca, Carlos M.M. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    For every mobilization of a new enterprise it is necessary to quickly obtain the greatest amount of relative information in regards to location and availability of infra-structure, logistics, and work site amenities. Among this information are reports elaborated for management of the enterprise, (organizational chart, work schedule, objectives, contacts, etc.) as well as geographic anomalies, social-economic and culture of the area to be developed such as territorial extension, land aspects, local population, roads and amenities (fuel stations ,restaurants and hotels), infra-structure of the cities (health, education, entertainment, housing, transport, etc.) and logistically the distance between cities the estimated travel time, ROW access maps and notable points, among other relevant information. With the idea of making this information available for everyone involved in the enterprise, it was elaborated for GASCAC Spread 2A a rapid guide containing all the information mentioned above and made it available for all the vehicles used to transport employees and visitors to the spread. With this, everyone quickly received the majority of information necessary in one place, in a practical, quick, and precise manner, since the information is always used and controlled by the same person. This study includes the model used in the gas pipeline GASCAC Spread 2A project and the methodology used to draft and update the information. Besides the above, a file in the GIS format was prepared containing all necessary planning, execution and tracking information for enterprise activities, from social communication to the execution of the works previously mentioned. Part of the GIS file information was uploaded to Google Earth so as to disclose the information to a greater group of people, bearing in mind that this program is free of charge and easy to use. (author)

  12. Developing Mathematical Literacy through project work: A teacher/teaching perspective

    Directory of Open Access Journals (Sweden)

    Renuka Vithal

    2006-10-01

    Full Text Available The implementation of the new Mathematical Literacy curriculum in South Africa is assuming several different conceptions of mathematics and therefore also being realised through a range of different pedagogies. In this paper I begin from a particular privileging of a critical perspective in mathematics education, which I argue is one (among others of the forces shaping the new South African curriculum reforms, particularly the Mathematical Literacy curriculum. If so, then the case for a specific pedagogy, that of project work, can be shown to support the development of a mathematical literacy from a critical perspective. In this paper a particular set of conceptual tools, principles and practices associated with project work, as developed in the Scandanavian context but researched in South Africa, are elaborated from the perspective of teachers/teaching of mathematical literacy.

  13. RFP to work on formation flying capabilities for spacecrafts for the GRACE project

    DEFF Research Database (Denmark)

    Riis, Troels; Thuesen, Gøsta; Kilsgaard, Søren

    1999-01-01

    The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts.......The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts....

  14. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projectsincluding explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  15. Factors of human capital related to project success in health care work units.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  16. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Guenter (RISA Sicherheitsanalysen GmbH (DE)); Jaenkaelae, Kalle (Fortum Nuclear Services Oy (FI)); Johanson, Gunnar; Lindberg, Sandra (ES Konsult, Stockholm (SE)); Knochenhauer, Michael (Relcon Scandpower AB, Stockholm (SE)); Schubert, Bernd (Vattenfall Europe (DE)); Vaurio, Jussi (Prometh Solutions (FI)); Wohlstein, Ralf (E.ON Kernkraft, Maschinentechnik (DE))

    2007-10-15

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  17. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    International Nuclear Information System (INIS)

    Becker, Guenter; Jaenkaelae, Kalle; Johanson, Gunnar; Lindberg, Sandra; Knochenhauer, Michael; Sc hubert, Bernd; Vaurio, Jussi; Wohlstei n, Ralf

    2007-10-01

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  18. Production of NDA Working Reference Materials for the Capability Evaluation Project

    International Nuclear Information System (INIS)

    Noll, P.D. Jr.; Marshall, R.S.

    1998-01-01

    The production of Non Destructive Assay (NDA) Working Reference Materials (WRMs) that are traceable to nationally recognized standards was undertaken to support implementation of the Idaho National Engineering and Environmental Laboratory (INEEL) Nondestructive Waste Assay Capability Evaluation Project (CEP). The WRMs produced for the CEP project consist of Increased Am/Pu mass ration (IAP) and depleted Uranium (DU) WRMs. The CEP IAP/DU WRM set provides radioactive material standards for use in combination with 55 gallon drum waste matrix surrogates for the assessment of waste NDA assay system performance. The Production of WRMs is a meticulous process that is not without certain trials and tribulations. Problems may arise at any of the various stages of WRM production which include, but are not limited to; material characterization (physical, chemical, and isotopic), material blend parameters, personnel radiation exposure, gas generation phenomenon, traceability to national standards, encapsulation, statistical evaluation of the data, and others. Presented here is an overall description of the process by which the CEP WRMs were produced and certified as well as discussions pertaining to some of the problems encountered and how they were solved

  19. Deep Help in Complex Project Work: Guiding and Path-Clearing Across Difficult Terrain

    OpenAIRE

    Fisher, Colin M.; Pillemer, Julianna; Amabile, Teresa M.

    2017-01-01

    How do teams working on complex projects get the help they need? Our qualitative investigation of the help provided to project teams at a prominent design firm revealed two distinct helping processes, both characterized by deep, sustained engagement that far exceeds the brief interactions described in the helping literature. Such deep help consisted of (1) guiding a team through a difficult juncture by working with its members in several prolonged, tightly clustered sessions, or (2) path-clea...

  20. Innovation in POPBL teaching and learning methods by embedding individual activities as an integrated part of project work

    DEFF Research Database (Denmark)

    Moesby, Egon; W., Hans Henrik; Kørnøv, Lone

    2005-01-01

    activity embedded as an integrated part of the project work. Students work in the solution phase of the project on an individual activity that is separately assessed. The results of these individual activities form the platform for students’ final work with the project as a team. They have to evaluate......In this paper, the authors describe a way to increase student learning through social constructed teamwork by adding an individual activity to the project work. This can be achieved not just by adding an individual activity outside or parallel to the project work, but by having the individual...... the individual solutions and find the one solution to work on in the final phases of the project. On top of that, it helps train students’ abilities to make evaluations among various solutions of which one is their own, thereby learning how to evaluate their personal solutions against another person’s solutions...

  1. Actividades comunicativas en la clase de Inglés : project work. News about your city

    OpenAIRE

    Valero Garcés, Carmen

    1991-01-01

    In the context of language learning, projects are multiskill activities focusing on topics or themes rather than on specific language targets. Students themselves playa crucial part in the initial choice of subject matter and the decisions related to appropiate working method, the project timetable and the eventual «end product». Project work provides students with opportunities to recycle know language and skills in a relatively natural context because specific language a...

  2. Analisis Kecelakaan Kerja Pada Proyek Bangunan Gedung (Analysis of Work Accident on Building Construction Projects)

    OpenAIRE

    Ferdiansyah, Deni; Winarno, Setya; M, Faisol A

    2009-01-01

    Work accidents and fatalities often happen in construction industry, thus a study on this matter to promote safety management needs a thorough analysis of their elements. The purpose of this paper is to identify various types of accidents, cost of accident and insurance premium, and also the correlation between the types of accidents and their costs. The data was collected from thirty construction projects around Daerah Istimewa Yogyakarta province and surrounding areas. These data included t...

  3. 25 CFR 170.623 - How are IRR Program projects and activities included in a self-governance agreement?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program projects and activities included in a self-governance agreement? 170.623 Section 170.623 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE... self-governance agreement? To include an IRR Program project or activity in a self-governance agreement...

  4. Web Environments for Group-Based Project Work in Higher Education

    NARCIS (Netherlands)

    Andernach, J.A.; van Diepen, N.M.; Collis, Betty; Andernach, Toine

    1997-01-01

    We discuss problems confronting the use of group-based project work as an instructional strategy in higher education and describe two courses in which course-specific World Wide Web (Web) environments have evolved over a series of course sequences and are used both as tool environments for

  5. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  6. Evaluating Tobacco Control Policies in 28 Countries (including 9 EU countries: The ITC Project

    Directory of Open Access Journals (Sweden)

    Geoffrey Fong

    2016-03-01

    Full Text Available Since its start in 2002, the ITC Project has been conducting evaluation studies of tobacco control policies via prospective cohort surveys of tobacco users in 28 countries, including 9 EU countries. This presentation will focus on the design of the ITC Project and how it differs from and complements existing evidence-gathering systems (monitoring and surveillance systems in measuring and understanding the impact of FCTC policies. The presentation will also describe the ITC Project's most recent initiatives: (1 the EUREST-PLUS study focusing on measuring the impact of the Tobacco Products Directive, and (2 a large-scale international cohort study of e-cigarettes starting in the United States, Canada, England, and Australia.

  7. Project Work Management Addressing the Needs of BVI Learners of EFL

    Directory of Open Access Journals (Sweden)

    Tatiana S. Makarova

    2017-12-01

    Full Text Available Introduction: it is known that inclusive education that opens access to education and facilitates students with special educational needs to socialize successfully is concentrated in special schools whilst mainstream teachers generally lack the methodology of teaching disabled students inclusively. The aim of the article is searching the best ways of educating students with special needs and providing specific conditions of the educational process in mainstream schools. Materials and Methods: the research is based on the results of fulfillment of a number of projects that deal with teaching and educating blind and visually impaired learners and in which all the authors of the article were involved. The problematic approach, the logical method and observation were applied to the research; analysis, comparison, generalization being the most important components of the study. The quantitative data were collected, analyzed and resumed as well. Results: the impact of project work implementation on academic and social skills development of blind and visually impaired students is shown and various types of projects that can be made by visually impaired learners are presented. The authors give their comments when analyzing different ways of adapting research activities to the needs of BVI learners. When speaking in detail on the role of web tools as maximizers of students’ potential the authors refer to their own experience in implementing web tools in project work with blind and visually impaired learners. Discussion and Conclusions: university teacher-training programs should be revised and improved by offering additional courses aimed at educating impaired students through doing research or project work. Special attention should be paid to developing the instructors’ project management skills in terms of teaching English as a foreign language to learners with special needs. It should be noted that different methods and various technological tools

  8. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  9. Life project of adolescents, a product of socio-educational work of school

    Directory of Open Access Journals (Sweden)

    Maibel Rebollar-Ferrer

    2016-10-01

    Full Text Available The improvement of formative work, through a life orientation that is characterized by the correspondence of aspirations or individual goals, potentials and social demands is a challenge to Junior high school in the design and implementation of sócio–educative system of actions, that led by principals and teachers, integrates socializing agents, in order to prepare adolescents in managing a developmental life project to ensure their integration into dynamic and complex society. This research paper nowadays, from the pedagogical, psychological and sociological references, a conceptual basis for understanding adolescents’ life project as an expression of integral formation and the product of social and educational work of school.

  10. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  11. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  12. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  13. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, Fanny; van Wissen, Leo J. G.; Kunst, Anton E.

    2013-01-01

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e 0) for the Netherlands up

  14. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, Fanny; van Wissen, Leo J. G.; Kunst, Anton E.

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e (0)) for the Netherlands up

  15. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  16. Including the smoking epidemic in internationally coherent mortality projections

    NARCIS (Netherlands)

    Janssen, F.; van Wissen, L.J.G.; Kunst, A.E.

    2013-01-01

    We present a new mortality projection methodology that distinguishes smoking- and non-smoking-related mortality and takes into account mortality trends of the opposite sex and in other countries. We evaluate to what extent future projections of life expectancy at birth (e0) for the Netherlands up to

  17. Senate works: law project on the energy policy (first reading)

    International Nuclear Information System (INIS)

    2004-01-01

    This synthesis of the Senate works on the law project on the energy policy, comments each article of the law text. It concerns: the energy demand control, the renewable energies, the equilibrium and the quality of the transport and distribution networks of electric power, taxation and financial incentives. (A.L.B.)

  18. Time, Place and Identity in Project Work on the Net

    DEFF Research Database (Denmark)

    Heilesen, Simon; Jensen, Sisse Siggaard

    2005-01-01

    This chapter identifies some of the fundamental conditions and factors that affect collaborative project work on the Net. Understanding them is fundamental to developing key qualities in Net-based collaborative learning such as confidence, reliability, and trust. We argue that: (1) Collaboration...... of Computer-Mediated Communication program at Roskilde University, Denmark....

  19. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong.

    Science.gov (United States)

    Wong, Francis K W; Chan, Albert P C; Wong, Andy K D; Hon, Carol K H; Choi, Tracy N Y

    2018-03-10

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the "Public Works Programme Construction Site Safety and Environmental Statistics" (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to 'fall of person from height'; (2) electricians with zero to five years of experience were prone to 'slip, trip or fall on same level'; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  20. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Directory of Open Access Journals (Sweden)

    Francis K. W. Wong

    2018-03-01

    Full Text Available A study on electrical and mechanical (E&M works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1 electricians with over 15 years of experience were prone to ‘fall of person from height’; (2 electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3 air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  1. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Science.gov (United States)

    Wong, Francis K. W.; Chan, Albert P. C.; Wong, Andy K. D.; Choi, Tracy N. Y.

    2018-01-01

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to ‘fall of person from height’; (2) electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched. PMID:29534429

  2. Collaborative Writing to Enhance Academic Writing Development through Project Work

    Science.gov (United States)

    Robayo Lun, Alma Milena; Hernandez Ortiz, Luz Stella

    2013-01-01

    Advanced students at university level struggle with many aspects of academic writing in English as a foreign language. The purpose of this article is to report on an investigation aimed at analyzing what collaborative writing through project work tells us about students' academic writing development at the tertiary level. The compositions written…

  3. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  4. Developing Employment Interview and Interviewing Skills in Small-group Project Work.

    Science.gov (United States)

    Hindle, Paul

    2000-01-01

    Discusses the value of communications skills in geographical education. Describes the use of realistic interviews that were a part of small-group project work. Explains that students wrote job specifications, a curriculum vitae, a cover letter, and conducted interview panels. (CMK)

  5. Learning to make technology work - a study of learning in technology demonstration projects

    DEFF Research Database (Denmark)

    Sutherland Olsen, Dorothy; Andersen, Per Dannemand

    2014-01-01

    Building working demonstrations of new technologies within sustainable energy and transport has become an important activity in the move towards a more energy efficient society. The work involved in building these demonstrations is usually organised in a project with a variety of different partic...

  6. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  7. NASA Work Breakdown Structure (WBS) Handbook

    Science.gov (United States)

    Terrell, Stefanie M.

    2018-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

  8. EDITORIAL: Student undergraduate laboratory and project work

    Science.gov (United States)

    Schumacher, Dieter

    2007-05-01

    that new experiments which illustrate both fundamental physics and modern technology can be realized even with a small budget. Traditional labwork courses often provide a catalogue of well known experiments. The students must first learn the theoretical background. They then assemble the setup from specified equipment, collect the data and perform the default data processing. However, there is no way to learn to swim without water. In order to achieve a constructivist access to learning, 'project labs' are needed. In a project labwork course a small group of students works as a team on a mini research project. The students have to specify the question of research, develop a suitable experimental setup, conduct the experiment and find a suitable way to evaluate the data. Finally they must present their results e.g. in the framework of a public poster session. Three contributions refer to this approach, however they focus on different aspects: 'Project laboratory for first-year students' by Gorazd Planinšič, 'RealTime Physics: active learning laboratories' by David Sokoloff et al and 'Labs outside labs: miniprojects at a spring camp for future physics teachers' by Leos Dvorák. Is it possible to prepare the students specifically for project labwork? This question is answered by the contribution 'A new labwork course for physics students: devices, methods and research projects' by Knut Neumann and Manuela Welzel. The two main parts of the labwork course cover first experimental devices (e.g. multimeters, oscilloscopes, different sensors, operational amplifiers, step motors, AD/DA-converters). Then subjects such as data processing, consideration of measurement uncertainties, keeping records or using tools like LABVIEW etc are focused on. Another concrete proposal for a new curriculum is provided by James Sharp et al, in 'Computer based learning in an undergraduate physics laboratory: interfacing and instrument control using MATLAB'. One can well imagine that project labs

  9. Including women in work | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2017-06-13

    Jun 13, 2017 ... ... near the production site to limit their travel to and from work, and she designed a ... Counting Women's Work found that the time women and girls spend ... the creation of jobs based on the real needs of women and families.

  10. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  11. A Model to Investigate the Effect of Work Ethic Culture on Dynamics of Rework in Management of Projects

    Directory of Open Access Journals (Sweden)

    Hossein Kiani

    2018-03-01

    Full Text Available The present study aims to investigate the effect of work ethic culture on rework in construction projects through a review of literature, surveys, and interviews with project managers. The main research question is what mechanisms can project manager use to balance the costs of personnel training, financial and language incentives, and implementation costs to finish the project with more profit and less rework. In this regard, modelling and data analysis is done using System Dynamics methodology. The results show that by considering work ethic, rework in the project is reduced from 46 % to 39 %. However, the project has been completed with 10 % lower cost and 26 % lower variance. Integrating the issue of rework with the culture of work ethic in the field of project management by at least one exogenous parameter has been studied, while in this study qualitative parameters have been converted to quantitative parameters using fuzzy inference system. The change in management approach to the issue of work ethics and the formulation of human resource strategies of large projects by human resource managers is one of the applications of this study.

  12. The Pedagogic Project as Provocative of the Collective Work in the School

    Directory of Open Access Journals (Sweden)

    Elaine Sampaio Araujo

    2007-06-01

    Full Text Available The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projects configured as activity don't just legitimate the collective participation as it establish a new theoretical and/or methodological order in the organization of the pedagogic work, provoking a school that learns and grows in the search of forming men and women of the best human quality.

  13. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  14. Co-benefits of including CCS projects in the CDM in India's power sector

    International Nuclear Information System (INIS)

    Eto, R.; Murata, A.; Uchiyama, Y.; Okajima, K.

    2013-01-01

    This study examines the effects of the inclusion of the co-benefits on the potential installed capacity of carbon dioxide capture and storage (CCS) projects with a linear programming model by the clean development mechanism (CDM) in India's power sector. It is investigated how different marginal damage costs of air pollutants affect the potential installed capacity of CCS projects in the CDM with a scenario analysis. Three results are found from this analysis. First, large quantity of IGCC with CCS becomes realizable when the certified emission reduction (CER) prices are above US$56/tCO 2 in the integrated Northern, Eastern, Western, and North-Eastern regional grids (NEWNE) and above US $49/tCO 2 in the Southern grid. Second, including co-benefits contributes to decrease CO 2 emissions and air pollutants with introduction of IGCC with CCS in the CDM at lower CER prices. Third, the effects of the co-benefits are limited in the case of CCS because CCS reduces larger amount of CO 2 emissions than that of air pollutants. Total marginal damage costs of air pollutants of US$250/t and US$200/t lead to CER prices of US$1/tCO 2 reduction in the NEWNE grid and the Southern grid. - Highlights: • We estimate effects of co-benefits on installed capacity of CCS projects in the CDM. • We develop a linear programming (LP) model of two grids of India. • Including co-benefits contributes to introduce IGCC with CCS in the CDM at lower CER prices

  15. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  16. Overview of the ACEX project iodine work

    Energy Technology Data Exchange (ETDEWEB)

    Merilo, M

    1996-12-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. (Abstract Truncated)

  17. Nuclear data development work in support of the National Bureau of Standards ISNF Project. Status report, February 1976-July 1980

    International Nuclear Information System (INIS)

    LaBauve, R.J.; George, D.C.; Muir, D.W.; Soran, P.D.; Eisenhauer, C.M.

    1980-12-01

    Work in several areas was completed by the Los Alamos Scientific Laboratory for the National Bureau of Standards in connection with the Intermediate-Energy Standard Neutron Field (ISNF) project during this reporting period. These areas include supplying multigroup cross section sets from ENDF/B-IV appropriate for ISNF calculations; determining the effects of small changes in calculational parameters, including cross section changes, in LSNF results; providing additional selected multigroup cross section sets from both ENDF/B-IV and ENDF/B-V; and performing comparison ISNF calculations using discrete ordinates and Monte Carlo codes. Plans for future work are briefly mentioned. 12 figures, 5 tables

  18. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  19. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    This is the nineteenth annual Report on the OECD Halden Reactor Project, describing activities at the Project during 1978, the last year of the 1976-1978 Halden Agreement. Work continued in two main fields: test fuel irradiation and fuel research, and computer-based process supervision and control. Project research on water reactor fuel focusses on various aspects of fuel behavior under normal, and off-normal transient conditions. In 1978, participating organisations continued to submit test fuel for irradiation in the Halden boiling heavy-water reactor, in instrumented test assemblies designed and manufactured by the Project. Work included analysis of the impact of fuel design and reactor operating conditions on fuel cladding behavior. Fuel performance modelling included characterization of thermal and mechanical behavior at high burn-up, of fuel failure modes, and improvement of data qualification procedures to reduce and quantify error bands on in-reactor measurements. Instrument development yielded new or improved designs for measuring rod temperature, internal pressure, axial neutron flux shape determination, and for detecting cladding defects. Work on computer-based methods of reactor supervision and control included continued development of a system for predictive core surveillance, and of special mathematical methods for core power distribution control

  20. Ergonomics work assessment in rural industrial settings: a student occupational therapy project.

    Science.gov (United States)

    Bowman, Peter J

    2012-01-01

    This case study describes a student occupational therapy (OT) program, the creation of a worksite assessment project as a part of a Community Connections: Partners for Learning and Service grant funded by Health Resources and Services Administration. The primary goals were to design occupation-based community learning experiences in a variety of rural community settings, so that students might benefit from participating in the community based learning and: based on the results, embed occupation-based learning into existing occupational therapy curriculum. The components of the project and the ergonomics content of the OT education program are described; details of the work assessment are presented with analysis of data from the student evaluation of this project.

  1. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2009). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. Presented at the 'Open workshop of TENCompetence - Rethinking Learning and Employment at a Time of Economic Uncertainty-event'. November, 19, 2009,

  2. Inhibition, Updating Working Memory, and Shifting Predict Reading Disability Symptoms in a Hybrid Model: Project KIDS.

    Science.gov (United States)

    Daucourt, Mia C; Schatschneider, Christopher; Connor, Carol M; Al Otaiba, Stephanie; Hart, Sara A

    2018-01-01

    Recent achievement research suggests that executive function (EF), a set of regulatory processes that control both thought and action necessary for goal-directed behavior, is related to typical and atypical reading performance. This project examines the relation of EF, as measured by its components, Inhibition, Updating Working Memory, and Shifting, with a hybrid model of reading disability (RD). Our sample included 420 children who participated in a broader intervention project when they were in KG-third grade (age M = 6.63 years, SD = 1.04 years, range = 4.79-10.40 years). At the time their EF was assessed, using a parent-report Behavior Rating Inventory of Executive Function (BRIEF), they had a mean age of 13.21 years ( SD = 1.54 years; range = 10.47-16.63 years). The hybrid model of RD was operationalized as a composite consisting of four symptoms, and set so that any child could have any one, any two, any three, any four, or none of the symptoms included in the hybrid model. The four symptoms include low word reading achievement, unexpected low word reading achievement, poorer reading comprehension compared to listening comprehension, and dual-discrepancy response-to-intervention, requiring both low achievement and low growth in word reading. The results of our multilevel ordinal logistic regression analyses showed a significant relation between all three components of EF (Inhibition, Updating Working Memory, and Shifting) and the hybrid model of RD, and that the strength of EF's predictive power for RD classification was the highest when RD was modeled as having at least one or more symptoms. Importantly, the chances of being classified as having RD increased as EF performance worsened and decreased as EF performance improved. The question of whether any one EF component would emerge as a superior predictor was also examined and results showed that Inhibition, Updating Working Memory, and Shifting were equally valuable as predictors of the hybrid model of RD

  3. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  4. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  5. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  6. What a Joint. Youth Training Scheme. Core Exemplar Work Based Project.

    Science.gov (United States)

    Further Education Staff Coll., Blagdon (England).

    This trainer's guide is intended to assist supervisors of work-based career training projects in helping students become familiar with meat processing--livestock at the stockyards, meat packers (wholesalers), and butcher shops--to the cooked state and to become familiar with the different joints (cuts or parts) of beef, lamb, and pork. The guide…

  7. Win-Win-Win: Reflections from a Work-Integrated Learning Project in a Non-Profit Organization

    Directory of Open Access Journals (Sweden)

    Dale C MacKrell

    2016-05-01

    Full Text Available This paper reports on the educational aspects of an information systems work-integrated learning (WIL capstone project for an organization which operates to alleviate homelessness in the Australian non-profit sector. The methodology adopted for the study is Action Design Research (ADR which draws on action research and design research as a means for framing a project's progress. Reflective insights by the project stakeholders, namely, students, academics, and the non-profit client, reveal a curriculum at work through internal features of the organization; personal features of the participants and features of the external environment. Preliminary findings suggest that students in a WIL project for a non-profit are highly engaged, especially when they become aware of the project’s social value. As well, the improvement of professional skills and emotional intelligence by students is more likely in real-life practice settings than in other less authentic WIL activities, equipping graduates for the workforce with both strong disciplinary and generic skills. Win-win-win synergies through project collaboration represent worthwhile outcomes to education, industry and research.

  8. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  9. Project Kaleidoscope: Advancing What Works in Undergraduate STEM Education

    Science.gov (United States)

    Elrod, S.

    2011-12-01

    In 1989, Project Kaleidoscope (PKAL) published its first report, What Works: Building Natural Science Communities, on reforming undergraduate STEM (science, technology, engineering and mathematics) education. Since then, PKAL has grown into a national organization comprised of a diverse group of over 6500 STEM educators who are committed to advancing "what works." The PKAL mission is to be a national leader in catalyzing the efforts of people, institutions, organizations and networks to move from analysis to action in significantly improving undergraduate student learning and achievement in STEM (science, technology, engineering and mathematics). Specifically, PKAL's strategic goals are to: 1) Promote the development and wider use of evidence-based teaching, learning and assessment approaches, 2) Build individual and organizational capacity to lead change in STEM education, and 3) Engage the broader community of external stakeholders - professional and disciplinary societies, business and industry groups, accreditation organizations, educational associations, governmental agencies, philanthropic organizations - in achieving our mission. PKAL achieves these goals by serving as the nexus of an interconnected and multidisciplinary web of people, ideas, strategies, evidence and resources focused on systemic change in undergraduate STEM education. PKAL also provides resources on critical issues, such as teaching using pedagogies of engagement, and engages interested faculty, campuses and professional societies in national projects and programs focused on cutting edge issues in STEM education. One of these projects - Mobilizing Disciplinary Societies for a Sustainable Future - is engaging eleven disciplinary societies, including the National Association of Geoscience Teachers, in defining specific resources, faculty development programs and goals focused on promoting undergraduate STEM courses that: 1) provide more knowledge about real-world issues; 2) connect these real

  10. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open

  11. Chernobyl Studies Project. Working Group 7.0, environmental transport and health effects

    International Nuclear Information System (INIS)

    Hendrickson, S.M.

    1994-01-01

    The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams

  12. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  13. The projects of skunk works 75 years of Lockheed Martin's advanced development programs

    CERN Document Server

    Pace, Steve

    2016-01-01

    The Projects of Skunk Works examines 75 years of Lockheed Martin's advanced development programs, from jet fighters to missiles, heavy-lift helicopters, a lighter-than-air ship, drones, and a stealth boat.

  14. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  15. A critical Social Work project

    Directory of Open Access Journals (Sweden)

    Carlos Montaño

    2006-04-01

    Full Text Available Contemporary social transformations, operated by the neoliberal program under the command of financial capital, bring new challenges to the group of citizens and men and women who live by the sale of their labor power. Social workers, individually and collectively, are not separate from this reality. The profession was characterized by its confrontation with these challenges and its questioning and analysis of its role in society, in its attempt to assume more critical profiles and commitments to the interests of workers and the subaltern sectors. An example of this is the “Reconceptualization Movement” and the later attempt to define na “Alternative Social Service” concerned with the meaning of its practice, with the process of critical knowledge, with a criticism of capitalism and its situations of social injustice. The current challenges include overcoming earlier weaknesses, collectively constructing an ethicalpolitical professional project that can competently and committedly confront, at the heart of progressive social forces, the conditions in which workers live (with or without employment as well as other subaltern populations.

  16. Learning network theory : its contribution to our understanding of work-based learning projects and learning climate

    OpenAIRE

    Poell, R.F.; Moorsel, M.A.A.H. van

    1996-01-01

    This paper discusses the relevance of Van der Krogt's learning network theory (1995) for our understanding of the concepts of work-related learning projects and learning climate in organisations. The main assumptions of the learning network theory are presented and transferred to the level of learning groups in organisations. Four theoretical types of learning projects are distinguished. Four different approaches to the learning climate of work groups are compared to the approach offered by t...

  17. Project management in libraries, archives and museums working with government and other external partners

    CERN Document Server

    Carpenter, Julie

    2010-01-01

    Aimed at practitioners and managers, this practical handbook provides a source of guidance on project management techniques for the academic and cultural heritage sectors, focusing on managing projects involving public sector and other external partners. Issues under consideration and illustration include: different approaches to managing projects and how to select appropriate methods; using project management tools and other applications in project development and implementation; ensuring the sustainability of project outcomes and transferability into practice; realistic monitoring methodolog

  18. Web application to access U.S. Army Corps of Engineers Civil Works and Restoration Projects information for the Rio Grande Basin, southern Colorado, New Mexico, and Texas

    Science.gov (United States)

    Archuleta, Christy-Ann M.; Eames, Deanna R.

    2009-01-01

    The Rio Grande Civil Works and Restoration Projects Web Application, developed by the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers (USACE) Albuquerque District, is designed to provide publicly available information through the Internet about civil works and restoration projects in the Rio Grande Basin. Since 1942, USACE Albuquerque District responsibilities have included building facilities for the U.S. Army and U.S. Air Force, providing flood protection, supplying water for power and public recreation, participating in fire remediation, protecting and restoring wetlands and other natural resources, and supporting other government agencies with engineering, contracting, and project management services. In the process of conducting this vast array of engineering work, the need arose for easily tracking the locations of and providing information about projects to stakeholders and the public. This fact sheet introduces a Web application developed to enable users to visualize locations and search for information about USACE (and some other Federal, State, and local) projects in the Rio Grande Basin in southern Colorado, New Mexico, and Texas.

  19. Radioactivity in north European waters: report of Working Group 2 of CEC project MARINA

    International Nuclear Information System (INIS)

    Camplin, W.C.; Aarkrog, A.

    1989-01-01

    The primary objective of Working Group 2 of Project MARINA was to consider recent measurements of environmental radioactivity in north European waters and to use this, and other information, to report likely magnitude of doses to the critical group from marine pathways. The monitoring data were supplemented, where appropriate, with predictions from simple models. The major sources of radioactivity studied were as follows: (i) liquid wastes from nuclear fuel reprocessing plants, (Sellafield, Dounreay, Cap de la Hague); (ii) liquid wastes from nuclear power plants and other major nuclear industry sites, (including Belgium, Denmark, France, Finland, GDR, FDR, Netherlands, Sweden, UK, USSR); (iii) solid waste disposal in the deep north-east Atlantic; (iv) fallout from Chernobyl; and (v) naturally-occurring radionuclides. (author)

  20. Flexible work hours, health and well-being in the European Union: preliminary data from a SALTSA project.

    Science.gov (United States)

    Costa, G; Akerstedt, T; Nachreiner, F; Baltieri, F; Folkard, S; Frings Dresen, M; Gadbois, C; Gartner, J; Grzech Sukalo, H; Harma, M; Kandolin, I; Silverio, J; Simoes, A

    2001-12-01

    Demand for flexible work hours (FWH) is increasing in Europe aimed at increasing the number of production hours on one hand, and, on the other, reducing individual working hours and/or increasing autonomy and control on them. In view of the lack of knowledge of the effects of FWH on health and safety, we started a pilot project, funded by the Joint Programme for Working Life Research in Europe (SALTSA), aimed at: a) comparing the most relevant national legislation and how the EU Directive 93/104 "concerning certain aspects of working time" has been implemented in the member States; b) reporting prevalence and trend of FWH in Europe according to the three EU Surveys on Working Conditions carried out in the last decade; c) collecting practical examples of innovative FWH; d) evaluating their impact on health and safety in relation to work sectors, job demands, social life, aging and gender. Consequent actions are going to include information and consultancy for pertinent authorities and social parties involved, as well as training programmes for Union officials and similar groups concerning the organisation of FWH according to ergonomic principles.

  1. How Undergraduate Students Use Social Media Technologies to Support Group Project Work

    Science.gov (United States)

    McAliney, Peter J.

    2013-01-01

    Technology continues to evolve and become accessible to students in higher education. Concurrently, teamwork has become an important skill in academia and the workplace and students have adopted established technologies to support their learning in both individual and team project work. Given the emergence of social media technologies, I examined…

  2. The Chicken and Egg Project

    Science.gov (United States)

    Alkon, Ivette

    2004-01-01

    This article describes a project on chickens and eggs undertaken by 5-year-old children in a bilingual school in Mexico City. It describes the three phases of the project and includes photographs and other documentation of the children's work.

  3. The TRAIN-project: railway safety and the train driver information environment and work situation. A summary of the main results

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, L. [MTO Psychology and Swedish National Rail Administration (Sweden); Ingre, M.; Kecklund, G.; Soederstroem, M.; Aakerstedt, T. [National Inst. for Psychosocial Factors and Health (Sweden); Lindberg, E. [Swedish National Rail Administration (Sweden); Jansson, A.; Olsson, E.; Sandblad, B. [Uppsala Univ. (Sweden). Dept. of Human-Computer Interaction; Almqvist, P. [Swedish State Railways (Sweden)

    2001-07-01

    The TRAIN project investigates traffic safety related risks, focusing in particular on the train driver work situation, use of information but also on the supporting safety organisation. It is an on-going project funded and managed by Swedish National Rail Administration and carried out by independent researchers. The project provides a multi-disciplinary investigation by use of a man-technology-organisation (MTO) perspective. Activities performed are task analysis, evaluation of the drivers use of information and interaction with the ATP system as well as analyses of stress, mental workload and work hours. Several methods are being used such as interviews, questionnaires, diaries, activity monitoring and videotapes. This paper gives an overview of the project as well as a short summary of the main results. Detailed results are presented in separate reports as started in the reference list. Some of the main results are that the drivers report severe problems concerning sleepiness on early morning shifts, problems with maintenance on vehicles, lack of information supporting the planning task as well as problems in understanding ATP functions. Two groups of drivers having a feed-back related as opposed to a feed-forward driving style could be identified. In conclusion there is a great need to perform more scientific studies of human factors and railway safety as well as to implement safety management programs including professional human factors competence in the railway industries. (orig.)

  4. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  5. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  6. Addiction and Lifestyles in Contemporary Europe: Reframing Addictions Project (ALICE RAP). Final Evaluation Report Deliverable 21.1, Work Package 21

    OpenAIRE

    Mittelmark, Maurice B.

    2016-01-01

    At the onset of the ALICE RAP project, the following objectives, description of work, and main tasks were agreed for Work Package 21: 1. To evaluate the overall functioning of the collaborative research project, using a state-of-art systems model of partnership functioning. 2. To document the interactions and linkages between project inputs, throughputs and outputs as the project unfolds over five years. 3. To facilitate structured discussions involving all pa...

  7. Inhibition, Updating Working Memory, and Shifting Predict Reading Disability Symptoms in a Hybrid Model: Project KIDS

    Directory of Open Access Journals (Sweden)

    Mia C. Daucourt

    2018-03-01

    Full Text Available Recent achievement research suggests that executive function (EF, a set of regulatory processes that control both thought and action necessary for goal-directed behavior, is related to typical and atypical reading performance. This project examines the relation of EF, as measured by its components, Inhibition, Updating Working Memory, and Shifting, with a hybrid model of reading disability (RD. Our sample included 420 children who participated in a broader intervention project when they were in KG-third grade (age M = 6.63 years, SD = 1.04 years, range = 4.79–10.40 years. At the time their EF was assessed, using a parent-report Behavior Rating Inventory of Executive Function (BRIEF, they had a mean age of 13.21 years (SD = 1.54 years; range = 10.47–16.63 years. The hybrid model of RD was operationalized as a composite consisting of four symptoms, and set so that any child could have any one, any two, any three, any four, or none of the symptoms included in the hybrid model. The four symptoms include low word reading achievement, unexpected low word reading achievement, poorer reading comprehension compared to listening comprehension, and dual-discrepancy response-to-intervention, requiring both low achievement and low growth in word reading. The results of our multilevel ordinal logistic regression analyses showed a significant relation between all three components of EF (Inhibition, Updating Working Memory, and Shifting and the hybrid model of RD, and that the strength of EF’s predictive power for RD classification was the highest when RD was modeled as having at least one or more symptoms. Importantly, the chances of being classified as having RD increased as EF performance worsened and decreased as EF performance improved. The question of whether any one EF component would emerge as a superior predictor was also examined and results showed that Inhibition, Updating Working Memory, and Shifting were equally valuable as predictors of the

  8. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  9. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  10. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  11. Social Licence to Operate through a gender lens : The challenges of including women’s interests in development assistance projects

    NARCIS (Netherlands)

    Jijelava, David; Vanclay, Frank

    2014-01-01

    The paper analyses the concept of social licence to operate from a gender perspective. We examine the challenges associated with obtaining a gender-aware social licence for development assistance organizations working in conservative, traditional rural societies. We argue that during project

  12. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  13. Work-based learning experiences help students with disabilities transition to careers: a case study of University of Washington projects.

    Science.gov (United States)

    Bellman, Scott; Burgstahler, Sheryl; Ladner, Richard

    2014-01-01

    This case study describes evidence-based practices employed by a collection of University of Washington projects that engage high school and postsecondary students with disabilities in work-based learning experiences such as industry and research internships, career development activities, job shadows, field trips, and mock interviews. The purpose of the article is two-fold. First, authors share best practices with others who wish to increase the participation of students with disabilities in work-based learning and thereby contribute to their academic and career success. The article discusses methods used to recruit students, employers and mentors, match students with specific opportunities, and prepare students for success. Second, authors share outcomes from studies regarding participation in these work-based learning opportunities, which include increased employment success, motivation to work toward a career, knowledge about careers and the workplace, job-related skills, ability to work with supervisors and coworkers, skills in self-advocating for accommodations, and perceived career options.

  14. The Educational Work and Life Project Professional college student. A necessary relationship in Higher Education

    Directory of Open Access Journals (Sweden)

    Noraida Garbizo Flores Montes de Oca

    2014-06-01

    Full Text Available The new tendencies of the superior Cuban education, require of an educational renewing practice after contributing to the integral formation of the graduate future university, by achieving it harmonize the formation of sk ills and attitudes habits knowledges and the construction of a project of professional life sustained in values. In this sense the academic year constitutes the cell of the educational work to this level. Therefore at present it works try to get evaluate the necessary question between the educational labor and the project of professional life of the university student, with emphasis in the |protagónico| role of the social actors of the educational process.

  15. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  16. Report on research and development work 1985 on the nuclear fusion project. Annual report of the Association KfK-Euratom

    International Nuclear Information System (INIS)

    Finken, D.

    1986-05-01

    The Nuclear Research Centre Karlsruhe and the Max Planck Institute for Plasma Physics together form the Nuclear Fusion Development Association. The partners collaborate with the aim of creating the physical and technical preconditions for the use of the energy released by nuclear fusion and to plan and carry out future large-scale experiments. The work of the Nuclear Research Centre Karlsruhe on fusion with magnetic containment is included in the nuclear fusion project and is part of the European fusion technology programme. The work is supported by an association contract between KfK and Euratom by the European Commission. Connections are built up between areas of work and new projects are prepared by supplementary KfK contributions, mostly studies. This is done with regard to the expansion of the technology programme to be expected for future years and the planning activities for NET. The reports collected here are contributions of the KfK institutes in 1985. The appendix contains a list of the tasks which KfK has taken over from the fusion technology programme of the EEC. References to the institutes' contributions make the assignment of textual contributions easier. (orig.) [de

  17. Including Organizational Cultural Parameters in Work Processes

    National Research Council Canada - National Science Library

    Handley, Holly A; Heacox, Nancy J

    2004-01-01

    ... between decision-makers of different nationalities. In addition to nationality, a decision-maker is also a member of an organization and brings this organizational culture to his role in the work process, where it may also affect his task performance...

  18. Reducing Stress within the Rehabilitative Work Setting - A Report on the ROSE Project

    Science.gov (United States)

    Wells, John S. G.; Denny, Margaret

    Reducing Occupational Stress in Employment (ROSE) is an EU funded project which aims to develop a combined person and work directed stress management programme in order to improve the long-term retention of staff in the vocational rehabilitation sector for mental health and intellectual disabilities.

  19. Waste Contaminants at Military Bases Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    The Waste Contaminants at Military Bases Working Group has screened six prospective demonstration projects for consideration by the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT). These projects include the Kirtland Air Force Base Demonstration Project, the March Air Force Base Demonstration Project, the McClellan Air Force Base Demonstration Project, the Williams Air Force Base Demonstration Project, and two demonstration projects under the Air Force Center for Environmental Excellence. A seventh project (Port Hueneme Naval Construction Battalion Center) was added to list of prospective demonstrations after the September 1993 Working Group Meeting. This demonstration project has not been screened by the working group. Two additional Air Force remediation programs are also under consideration and are described in Section 6 of this document. The following information on prospective demonstrations was collected by the Waste Contaminants at Military Bases Working Group to assist the DOIT Committee in making Phase 1 Demonstration Project recommendations. The remainder of this report is organized into seven sections: Work Group Charter's mission and vision; contamination problems, current technology limitations, and institutional and regulatory barriers to technology development and commercialization, and work force issues; screening process for initial Phase 1 demonstration technologies and sites; demonstration descriptions -- good matches;demonstration descriptions -- close matches; additional candidate demonstration projects; and next steps

  20. The work and recovery project: changing organizational culture and practice in New York City outpatient services.

    Science.gov (United States)

    Pascaris, Alysia; Shields, Leslie Reed; Wolf, Jessica

    2008-01-01

    Complex and multiple barriers confront out-patient programs in promoting recovery and addressing mental health recipients' work-related goals. This article describes a focused organizational change project utilizing intensive consultation and technical assistance within five New York City outpatient psychiatric services. The project aimed to increase staff exposure to, understanding and use of work-related and recovery-based concepts to promote consumers' recovery and attainment of employment goals. Tailored assessment, curriculum delivery, and identification and implementation of change objectives were useful strategies in promoting change. This change model can serve to assist programs in their efforts to integrate new approaches and to better understand changes among leadership, staff and consumers, and changes in organizational culture and practice required to support a work and recovery-oriented service paradigm. The project experience suggests that adopting and embracing new practices takes time. Varied and incremental steps toward programmatic and operational changes can be significant and can reap authentic sustainable change occurring in the process of learning, experiencing, internalizing and adjusting to new methods of practice.

  1. Interdisciplinary Action in Halls of EJA: the projects work in the light of focus-cultural history

    Directory of Open Access Journals (Sweden)

    Cyntia Graziella Guizelim Simões Girotto

    2009-11-01

    Full Text Available This article aims to discuss the organization of work teaching in classrooms of Pejão (Program of Education for Youth and Adult - Unesp - Linda through the Work Projects, which underlie actions from the perspective of interdisciplinary Theory History-Culture. Pointing to the pedagogical implications of this conception of education, considering the formation of educating young adults and forth the use of time and space for education, production of knowledge, the procedure to information given to school subjects, the development / implementation / development / evaluation of projects of interdisciplinary work in the light of the focus vygotiskiano. Therefore, our gaze is theoretical and methodological back-up for a particular context: the classes of its shares in EJA interdisciplinary. Discuss such issues as follows: the first section, we present the general theory, discussing key concepts such as mediation, activity, learning, development, and then inserted the actions of students and educators of EJA. In a second section, we draw some lessons of that theory, to (re present and (re thinking projects in the EJA, resignified and resizing them by vygotiskiano bias.

  2. A project-based system for including farmers in the EU ETS

    DEFF Research Database (Denmark)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-01-01

    as ‘the missing link’ in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system......Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices...... for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits...

  3. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  4. CTOs at work

    CERN Document Server

    Donaldson, Scott; Donaldson, Gary

    2012-01-01

    Scott Donaldson, Stanley Siegel and Gary Donaldson interview many of the world's most influential chief technology officers in CTOs at Work, offering a brand-new companion volume to the highly acclaimed elite At Work books including Coders at Work, CIOS at Work and Venture Capitalists at Work. As the words "at work" suggest, the authors focus on how their interviewees tackle the day-to-day work of the CTO while revealing much more: how they got there, how they manage and allocate projects, and how they interact with business units and ensure that their companies take advantage of technologies,

  5. Collective Efficacy and Its Relationship with Leadership in a Computer-Mediated Project-Based Group Work

    Science.gov (United States)

    Huh, Yeol; Reigeluth, Charles M.; Lee, Dabae

    2014-01-01

    Based on Bandura's work, the four sources of efficacy shaping were examined in regard to frequency and students' perception of importance in a computer-mediated, project-based high school classroom. In a context of group work where there was no designated leader, groups' collective efficacy was examined if it has any relationship with individual's…

  6. Maya Studio Projects Photorealistic Characters

    CERN Document Server

    Palamar, Todd

    2011-01-01

    Create realistic characters with Maya tools and this project-based book Maya character generation tools are extremely sophisticated, and there's no better way to learn all their capabilities than by working through the projects in this hands-on book. This official guide focuses on understanding and implementing Maya's powerful tools for creating realistic characters for film, games, and TV. Use a variety of tools to create characters from skeleton to clothing, including hairstyles and facial hair, and learn how to use Performance Capture. A DVD includes supplementary videos, project support fi

  7. Application of performance assessment as a tool for guiding project work

    International Nuclear Information System (INIS)

    McCombie, C.; Zuidema, P.

    1992-01-01

    The ultimate aim of the performance assessment methodology developed over the last 10-15 years is to predict quantitatively the behavior of disposal systems over periods of time into the far future. The methodology can, however, also be applied in range of tasks during repository development and is in many programmes used as a tool for improving or optimizing the design of subsystem components of for guiding the course of project planning. In Swiss waste management program, there are several examples of the use of performance assessment as a tool in the manner mentioned above. The interaction between research models, assessment models and simplified models is considered to be of key importance and corresponding measures are taken to properly structure the process and to track the data: first, the results of all applications of the models are included in a consistent manner in the scenario analyses for the different sites and systems and, second, consistency in the underlying assumptions and in the data used in the different model calculations is assured by the consequent application of a configuration data management system (CDM). Almost all the applications of performance assessment have been included in Swiss work, but for this paper, only two examples have been selected: applications of performance assessment in both the HLW and the LLW program; and acceptance of specific waste types and their allocation to an appropriate repository on the basis of simplified safety analyses

  8. The greenGain project - Biomass from landscape conservation and maintenance work for renewable energy production in the EU

    Science.gov (United States)

    Clalüna, Aline; Baumgarten, Wibke; García Galindo, Daniel; Lenz, Klaus; Doležal, Jan; De Filippi, Federico; Lorenzo, Joaquín; Montagnoli, Louis

    2017-04-01

    The project greenGain is looking for solutions to increase the energy production with regional and local biomass from landscape conservation and maintenance work, which is performed in the public interest. The relevant resources analysed in the greenGain model regions are, among others, biomass residues from clearing invasive vegetation in marginal agricultural lands in Spain, and residues from abandoned vineyards and olive groves in landscape protected areas in Italy. The main target groups are regional and local players who are responsible for maintenance and conservation work and for the biomass residue management in their regions. Moreover, the focus will be on service providers - including farmers and forest owners, their associations, NGOs, energy providers and consumers. Local companies, municipalities and public authorities are collaborating to identify the still underutilised non-food biomass resources and to discuss the way to integrate them into the local and regional biomass markets. Since the start of the three year project in January 2015, the partners from Italy, Spain, Czech Republic and Germany analysed, among other, the biomass feedstock potential coming from landscape maintenance work, and assessed various technological options to utilise this type of biomass. Further, political, legal and environmental aspects as well as awareness raising and public acceptance actions regarding the energetic use of biomass from public areas were assessed. greenGain also facilitates the exchange between model regions and other similar relevant players in the EU and shares examples of good practice. General guidelines will be prepared to guarantee a wide dissemination to other regions in the EU. Thus, the project shows how to build-up reliable knowledge on local availability of this feedstock and provides know-how concerning planning, harvesting, pre-treatment, storage and sustainable conversion pathways to a wide range of stakeholders in the EU.

  9. Knowledge Translation of Interprofessional Collaborative Patient-Centred Practice: The Working Together Project Experience

    Science.gov (United States)

    MacDonald, Colla J.; Archibald, Douglas; Stodel, Emma; Chambers, Larry W.; Hall, Pippa

    2008-01-01

    The Working Together (WT) project involved the design and delivery of an online learning resource for healthcare teams in long-term care (LTC) so that knowledge regarding interprofessional collaborative patient-centred practice (ICPCP) could be readily accessed and then transferred to the workplace. The purpose of this paper is to better…

  10. Electron ring design for HERA, including spin-matching

    International Nuclear Information System (INIS)

    Skuja, A.; Hand, L.; Steffen, K.; Barber, D.

    1984-01-01

    A. Skuja has been working in collaboration with Professor Lou Hand in obtaining an optics for the electron ring at HERA that satisfies the usual constraints of an electron storage ring, but in addition allows longitudinal polarization in the interaction region without depolarizing the electron beam completely. This collaboration effort grew out of their work on a possible electron ring at Fermilab. When this project was degraded in priority at Fermilab, they turned their attention to the HERA project at DESY. The HERA project will have an electron ring of about 30 GeV e - (or e + ) incident on 800 GeV protons. Recently it has been decided that the collisions should be head on (0 0 crossing), although all previous designs had a crossing angle of the 2 beams of 20 mrad. Professors Hand and Skuja implemented a complete program in the last year and a half that could fit the usual Turis parameters as well as the so called 12 spin-matching conditions of Chao and Yukoya for all possible machine elements including solenoids. The program has the possibility of fully coupling vertical and horizontal motion using the usual eigenvalue method

  11. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  12. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  13. NASA/ORNL/AFRL Project Work on EBM LSHR: Additive Manufacturing of High-Temperature Gamma-Prime Strengthened Ni-Based Superalloys

    Science.gov (United States)

    Sudbrack, Chantal K.; Kirka, Michael M.; Dehoff, Ryan R.; Carter, Robert W.; Semiatin, Sheldon L.; Gabb, Timothy P.

    2016-01-01

    Powder-bed fabrication of aerospace alloys may revolutionize production by eliminating the need for extensive machining and expensive tooling. Heated-bed electron-beam melting (EBM) offers advantages over non-heated laser additive manufacturing (AM) methods, including lower residual stress, reduced risk of contamination, slower cooling rates, and faster build times. NASA Glenn Research Center has joint project work with Oak Ridge National Lab and the Air Force Research Laboratory to explore the feasibility of fabricating advanced Ni-based gamma-prime superalloys with EBM AM.

  14. Lead user projects in practice

    DEFF Research Database (Denmark)

    Brem, Alexander; Gutstein, Adele

    2018-01-01

    Earlier research on the lead user method is focused on individual case studies and how the method was applied in a specific context. In this paper, we take a broader approach, analyzing a sample of 24 lead user projects, which included working with 188 lead users. These projects were analyzed...

  15. Project management the agile way making it work in the enterprise

    CERN Document Server

    Goodpasture, John C

    2016-01-01

    Widely acclaimed as one of the top Agile books and a recommended resource for the PMI-ACP Exam in its first edition, Project Management the Agile Way by popular demand has been updated and redesigned. This second edition is in modular format to facilitate training and advanced course instruction, and provides new coverage of Agile, such as hybrid agile methods, the latest public sector practices, and a chapter dedicated to transitioning to agile. It discusses the "grand bargain" between project management and business, the shift in dominance from plans to product, and from input to output, and introduces new concepts such as return on benefit. Experienced practitioners and students that want to learn how to make agile work effectively in the enterprise should read this book. Individuals preparing for the PMI Agile Certified Practitioner (PMI-ACP) examination, and training providers developing courses, will find this second edition quite helpful.

  16. Record of the first meeting of the working group, London, 6-7 December 1977 (includes terms of reference)

    International Nuclear Information System (INIS)

    The items discussed include the presentation and adoption of the Group Working Paper on: terms of reference, prime objectives, topics and assessments, criteria for proliferation resistance, the organization of the Group, including the establishment of two sub-groups, schedule of work, assignment of work to be done, and the contributions to be made by international organizations

  17. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  18. Proven approaches to organise a large decommissioning project, including the management of local stakeholder interests

    International Nuclear Information System (INIS)

    Rodriguez, A.

    2005-01-01

    Full text: Spanish experience holds a relatively important position in the field of the decommissioning of nuclear and radioactive facilities. Decommissioning projects of uranium concentrate mill facilities are near completion; some old uranium mine sites have already been restored; several projects for the dismantling of various small research nuclear reactors and a few pilot plants are at various phases of the dismantling process, with some already completed. The most notable Spanish project in this field is undoubtedly the decommissioning of the Vandellos 1 nuclear power plant that is currently ready to enter a safe enclosure, or dormancy, period. The management of radioactive wastes in Spain is undertaken by 'Empresa Nacional de Residuos Radioactivos, S.A.' (ENRESA), the Spanish national radioactive waste company, constituted in 1984. ENRESA operates as a management company, whose role is to develop radioactive waste management programmes in accordance with the policy and strategy approved by the Spanish Government. Its responsibilities include the decommissioning and dismantling of nuclear installations. Decommissioning and dismantling nuclear installations is an increasingly important topic for governments, regulators, industries and civil society. There are many aspects that have to be carefully considered, planned and organised in many cases well in advance of when they really need to be implemented. The goal of this paper is describe proven approaches relevant to organizing and managing large decommissioning projects, in particular in the case of Vandellos-1 NPP decommissioning. (author)

  19. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  20. Nuclear Safety Project

    International Nuclear Information System (INIS)

    1978-11-01

    The 13th semi-annual report 1/78 is a description of work within the Nuclear Safety Project performed in the first six months of 1978 in the nuclear safety field by KFK institutes and departments and by external institutions on behalf of KfK. It includes for each individual research activity short summaries on - work completed, - essential results, - plans for the near future. (orig./RW) [de

  1. The Impact of Project Work and the Writing Process Method on Writing Production

    Science.gov (United States)

    Díaz Ramírez, Marcela

    2014-01-01

    This article presents the outcomes of an investigation whose main goal was to implement the methodology of project work and a process approach in order to improve writing production in an English class of Colombian university students since their diagnostic tests showed that their written production had the lowest score. Based on data collected,…

  2. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  3. Working conditions in nuclear reprocessing plants

    International Nuclear Information System (INIS)

    1986-12-01

    In the context of the project, the working conditions of workers in reprocessing plants and associated plant of the fuel circuit were thoroughly examined. The project design and course of the project are a good example of a precautionary technical assessment necessary for social policy reasons, which is in the public interest and is required by the Trade Unions. By working conditions, one means the whole set of scientific/technical, medical, legal, economic and political conditions for the permanent employment of workers in reprocessing plants including the associated parts of the fuel circuit. (orig./HP) [de

  4. Characteristics of the process of culture development project activities (culture of social engineering) at the future bachelors of social work

    OpenAIRE

    Natalya I. Nikitina; Elena Yu. Romanovaa; Tatyana V. Vasilyeva; Irina N. Nikishina; Veronica M. Grebennikova

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate`s (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of young specialists in social sphere institutions. The article discusses various aspects of future social work bachelors` vocational project activity cult...

  5. Educational Interdisciplinarity in the High School through working with Pedagogical Projects

    Directory of Open Access Journals (Sweden)

    Irinéa de Lourdes Batista

    2008-08-01

    Full Text Available In this research, an understanding about scholar interdisciplinarity and project working is brought, aiming at showing that the last one is an alternative methodological to promote an interdisciplinary educative practice. Therefore a pedagogical proposal was built to implement interdisciplinarity in Science and Mathematics Education in High School. It is exposed the theoretical syntheses, analysis and discussions concerning the pertinence and possibility to implement the proposal studied by the teachers and pedagogical staff in a public High School in the State of Paraná, Brazil.

  6. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  7. Looking after Lawns and Bedding. Youth Training Scheme. Core Exemplar Work Based Project.

    Science.gov (United States)

    Further Education Staff Coll., Blagdon (England).

    This trainer's guide is intended to assist supervisors of work-based career training projects in teaching students about lawn care. The guide is one in a series of core curriculum modules that is intended for use in combination on- and off-the-job programs to familiarize youth with the skills, knowledge, and attitudes necessary for success in the…

  8. Transfer of innovation, knowledge and competencies on the care service for people with acquired disabilities: the European Project "Care for Work".

    Science.gov (United States)

    Barchitta, M; Fragapane, S; Consoli, M T; Pennisi, C; Agodi, A

    2012-01-01

    The growing needs of people with disabilities require to integrate this issue into public health in order to improve political feasibility and to ensure that disability will not be left off from any strategic table. The main aim of the "Care for Work" project was to provide training contents to help workers and unemployed people to adapt their knowledge, skills and competencies to the care services sector in order to facilitate their insertion in a new employment source. The partners participating in the project are Organizations from 5 European countries. The project has been divided into seven Work Packages (WPs): three transversal WPs and four specific WPs, each addressing specific activities necessary to achieve the final objectives of the project. The "Care for Work" learning environment contains specific information and training on the techniques for caring people with acquired physical disabilities, as text documents and short training films. The project combines e-learning (Web 2.0) and mobile learning providing a flexible training platform for workers of care services sector. The "Care for Work" project offers specific training addressed to meet the new existing needs of workers of the care services sector and/or unemployed people. All the information and results of the project are available on the web page: www.careforwork.eu, and the present article is part of the WP "Valorization".

  9. A reanalysis of a behavioral intervention to prevent incident HIV infections: Including indirect effects in modeling outcomes of Project EXPLORE

    Science.gov (United States)

    Eaton, Lisa A.; Kalichman, Seth C.; Kenny, David A.; Harel, Ofer

    2013-01-01

    Background Project EXPLORE -- a large-scale, behavioral intervention tested among men who have sex with men (MSM) at-risk for HIV infection --was generally deemed as ineffective in reducing HIV incidence. Using novel and more precise data analytic techniques we reanalyzed Project EXPLORE by including both direct and indirect paths of intervention effects. Methods Data from 4,296 HIV negative MSM who participated in Project EXPLORE, which included ten sessions of behavioral risk reduction counseling completed from 1999-2005, were included in the analysis. We reanalyzed the data to include parameters that estimate the overtime effects of the intervention on unprotected anal sex and the over-time effects of the intervention on HIV status mediated by unprotected anal sex simultaneously in a single model. Results We found the indirect effect of intervention on HIV infection through unprotected anal sex to be statistically significant up through 12 months post-intervention, OR=.83, 95% CI=.72-.95. Furthermore, the intervention significantly reduced unprotected anal sex up through 18 months post-intervention, OR=.79, 95% CI=.63-.99. Discussion Our results reveal effects not tested in the original model that offer new insight into the effectiveness of a behavioral intervention for reducing HIV incidence. Project EXPLORE demonstrated that when tested against an evidence-based, effective control condition can result in reductions in rates of HIV acquisition at one year follow-up. Findings highlight the critical role of addressing behavioral risk reduction counseling in HIV prevention. PMID:23245226

  10. 76 FR 9346 - Sun City Project LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2857-000] Sun City Project LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Sun City...

  11. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  12. The MANGO FET-HPC Project: an overview

    OpenAIRE

    Flich Cardo, José; Agosta, Giovanni; Ampletzer, Philipp; Atienza Alonso, David; Cilardo, Alessandro; Fornaciari, William; Kovac, Mario; Roudet, Fabrice; Zoni, Davide

    2015-01-01

    © 2015 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works. In this paper, we provide an overview of the MANGO project and its goal. The MANGO project aims at address...

  13. Chernobyl Studies Project: Working group 7.0, Environmental transport and health effects. Progress report, March--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anspaugh, L.R.; Hendrickson, S.M. [eds.

    1994-12-01

    In April 1988, the US and the former-USSR signed a Memorandum of Cooperation (MOC) for Civilian Nuclear Reactor Safety; this MOC was a direct result of the accident at the Chernobyl Nuclear Power Plant Unit 4 and the following efforts by the two countries to implement a joint program to improve the safety of nuclear power plants and to understand the implications of environmental releases. A Joint Coordinating Committee for Civilian Nuclear Reactor Safety (JCCCNRS) was formed to implement the MOC. The JCCCNRS established many working groups; most of these were the responsibility of the Nuclear Regulatory Commission, as far as the US participation was concerned. The lone exception was Working Group 7 on Environmental Transport and Health Effects, for which the US participation was the responsibility of the US Department of Energy (DOE). The purpose of Working Group 7 was succintly stated to be, ``To develop jointly methods to project rapidly the health effects of any future nuclear reactor accident.`` To implement the work DOE then formed two subworking groups: 7.1 to address Environmental Transport and 7.2 to address Health Effects. Thus, the DOE-funded Chernobyl Studies Project began. The majority of the initial tasks for this project are completed or near completion. The focus is now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are currently working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.

  14. The Influence of tolerance on the Learning Processes in Project Group Work

    DEFF Research Database (Denmark)

    Wiberg, Merete

    This paper presents a moral perspective on group work in higher education by addressing tolerance as a moral value of practice which is intertwined with learning of disciplinary knowledge. The relevance of tolerance among students is discussed in relation to Dewey's ideas of learning through...... participation. A link between morality and learning via knowledge production is to be found in the concept of participation due to an understanding of education as constitutive for a democratic society.The aim is to sharpen and discuss the concept of tolerance with respect to both strength and limits...... of the concept. Project group work is an example of a social setting in an educational context where collaboration between students on the one hand is seen as a way to stimulate processes of learning  and on the other hand to strengthen social and moral competences. To be discussed in the paper is how group work...

  15. Writing the Book…Literally: The Convergence of Authentic Intellectual Work (AIW) and Project-Based Learning (PBL)

    Science.gov (United States)

    Buckmiller, Tom M.; Kruse, Jerrid W.

    2015-01-01

    Using the Project-Based Learning (PBL) and Authentic Intellectual Work (AIW) models, we sought to create coursework that had value beyond the classroom. Refinements in the self-publishing book industry provide the opportunity to present student work to a larger audience and in a different, more engaging format. With the help of free software, our…

  16. A project-based system for including farmers in the EU ETS.

    Science.gov (United States)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-04-01

    Farmers in the EU do not trade greenhouse gases under the Kyoto agreement. This is an empirical puzzle because agriculture is a significant contributor of greenhouse gases (GHG) in the EU and may harvest private net gains from trade. Furthermore, the US has strongly advocated land-use practices as 'the missing link' in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system for including the farming practices in the EU ETS that reduces the uncertainty from measuring emission reduction in this sector. The system encourages GHG reduction either by introducing a new and less polluting practice or by reducing the polluting activity. When doing so, farmers will receive GHG permits corresponding to the amount of reduction which can be stored for later use or sold in the EU ETS. Copyright © 2010 Elsevier Ltd. All rights reserved.

  17. [Experience of knowledge translation in the ITSAL (immigration, work and health) research project with representatives of the target population].

    Science.gov (United States)

    Ronda, Elena; López-Jacob, M José; Paredes-Carbonell, Joan J; López, Pilar; Boix, Pere; García, Ana M

    2014-01-01

    This article describes the experience of knowledge translation between researchers of the ITSAL (immigration, work and health) project and representatives of organizations working with immigrants to discuss the results obtained in the project and future research lines. A meeting was held, attended by three researchers and 18 representatives from 11 institutions. Following a presentation of the methodology and results of the project, the participants discussed the results presented and research areas of interest, thus confirming matches between the two sides and obtaining proposals of interest for the ITSAL project. We understand the process described as an approach to social validation of some of the main results of this project. This experience has allowed us to open a channel of communication with the target population of the study, in line with the necessary two-way interaction between researchers and users. Copyright © 2013 SESPAS. Published by Elsevier Espana. All rights reserved.

  18. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    OpenAIRE

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open workshop (pp. 22-33). November, 19-20, 2009, Manchester, UK. Bolton, UK: Institute for Educational Cybernetics, The University of Bolton. For the complete book please see http://hdl.handle.net/1820/3191

  19. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  20. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  1. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  2. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  3. Energy secretary's priorities include San Francisco area research projects

    CERN Multimedia

    Widener, A

    2003-01-01

    "Bay Area research labs got a big boost Monday when the Secretary of Energy unveiled his priorities for major research projects his agency hopes to fund over the next two decades. Among the agency's 28 top priorities are a major computer expansion and an experiment examining the expanding universe that could be housed at Lawrence Berkeley Lab and a powerful X-ray laser planned for the Stanford Linear Accelerator Center" (1 page).

  4. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  5. National Writing Project. 2011-2012 Report

    Science.gov (United States)

    National Writing Project (NJ1), 2012

    2012-01-01

    This National Writing Project 2011-2012 Report describes how Writing Project teacher-leaders study and share effective practices that enhance student writing and learning, work collaboratively with other educators, design resources, and take on new roles in effecting positive change. It includes a financial summary for years ended September 30 for…

  6. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  7. Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa.

    Science.gov (United States)

    Aranda-Jan, Clara B; Mohutsiwa-Dibe, Neo; Loukanova, Svetla

    2014-02-21

    Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Forty-four studies on mHealth projects in Africa were included and classified as: "patient follow-up and medication adherence" (n = 19), "staff training, support and motivation" (n = 2), "staff evaluation, monitoring and guidelines compliance" (n = 4), "drug supply-chain and stock management" (n = 2), "patient education and awareness" (n = 1), "disease surveillance and intervention monitoring" (n = 4), "data collection/transfer and reporting" (n = 10) and "overview of mHealth projects" (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or lack of resources. mHealth in Africa is an innovative approach

  8. Learning to work together - lessons from a reflective analysis of a research project on public involvement.

    Science.gov (United States)

    Howe, A; Mathie, E; Munday, D; Cowe, M; Goodman, C; Keenan, J; Kendall, S; Poland, F; Staniszewska, S; Wilson, P

    2017-01-01

    Patient and public involvement (PPI) in research is very important, and funders and the NHS all expect this to happen. What this means in practice, and how to make it really successful, is therefore an important research question. This article analyses the experience of a research team using PPI, and makes recommendations on strengthening PPI in research. There were different PPI roles in our study - some people were part of the research team: some were on the advisory group; and there were patient groups who gave specific feedback on how to make research work better for their needs. We used minutes, other written documents, and structured individual and group reflections to learn from our own experiences over time. The main findings were:- for researchers and those in a PPI role to work in partnership, project structures must allow flexibility and responsiveness to different people's ideas and needs; a named link person can ensure support; PPI representatives need to feel fully included in the research; make clear what is expected for all roles; and ensure enough time and funding to allow meaningful involvement. Some roles brought more demands but also more rewards than others - highlighting that it is important that people giving up their time to help with research experience gains from doing so. Those contributing to PPI on a regular basis may want to learn new skills, rather than always doing the same things. Researchers and the public need to find ways to develop roles in PPI over time. We also found that, even for a team with expertise in PPI, there was a need both for understanding of different ways to contribute, and an evolving 'normalisation' of new ways of working together over time, which both enriched the process and the outputs. Background Patient and public involvement (PPI) is now an expectation of research funders, in the UK, but there is relatively little published literature on what this means in practice - nor is there much evaluative research

  9. Fourth natural analogue working group meeting and Pocos de Caldas project final workshop

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1991-01-01

    The fourth meeting of the CEC-sponsored natural analogue working group (NAWG) was held in Pitlochry, Scotland, from 18 to 22 June 1990, and also included the final workshop of the Pocos de Caldas (Brazil) natural analogue project, sponsored by Nagra (CH), SKB (S) UK-DOE and US-DOE. About 80 specialists attended this meeting, originating from EC Member States and also Australia, Brazil, Canada, Finland, Japan, Sweden, Switzerland and the USA. The IAEA and OCDE-NEA were also represented. This plenary meeting was the opportunity to review and discuss five years of progress and activities of natural analogues in central areas of performance assessment: waste forms and engineered barriers, geochemistry and radionuclide speciation, radionuclide migration and the overall geological context of radwaste disposal. In addition, a feedback session provided the opportunity for regulators and those individuals who had advisory roles to give their views and impressions on the significance of natural analogue research. These proceedings, divided into two sessions, contain 32 technical papers and 14 abstracts of published papers

  10. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  11. Earth-moving equipment as base machines in forest work. Final report of an NSR project

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Jerry [ed.

    1997-12-31

    Excavators have been used for forest draining for a long time in the Nordic countries. Only during the 1980s they were introduced as base machines for other forest operations, such as mounding, processing, harvesting, and road construction and road maintenance. Backhoe loaders were introduced in forestry at a somewhat later stage and to a smaller degree. The number of this type of base machines in forestry is so far small and is increasing very slowly. The NSR project `Earth moving equipment as base machines in forest work` started in 1993 and the project ended in 1995. The objective of the project was to obtain an overall picture of this type of machines up to a point where the logs are at landing site, ready for transportation to the industry. The project should cover as many aspects as possible. In order to obtain this picture, the main project was divided into sub projects. The sub projects separately described in this volume are (1) Excavators in ditching operations and site preparation, (2) Backhoe loaders in harvesting operations, (3) Excavators in wood cutting operations, (4) Tracked excavators in forestry operations, (5) Crawler versus wheeled base machines for single-grip harvester, and (6) Soil changes - A comparison between a wheeled and a tracked forest machine

  12. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  13. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  14. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  15. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  16. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  17. Fabrication and installment of hard-wired I and C works for the neutral beam injection system of the KSTAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun; In, Sang Ryul; Yoon, Jae Sung

    2004-01-01

    Instrumentation and Control(I and C) of the neutral beam injection(NBI) system for the K-STAR national fusion research project has been working from the start of the project to answer diverse requests arising from various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Some examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. They are one of those integral parts for the proper operation of the NBI system. Examples of those hard-wired I and C works are introduced in this presentation

  18. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  19. Improved business driveway delineation in urban work zones.

    Science.gov (United States)

    2015-04-01

    This report documents the efforts and results of a two-year research project aimed at improving driveway : delineation in work zones. The first year of the project included a closed-course study to identify the most : promising driveway delineation a...

  20. Advanced Engineering Environment FY09/10 pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  1. The GENERATE Project: Curricular and Pedagogical Inspiration from Parents and Their Children Working Together

    Science.gov (United States)

    Barnes, Jonathan

    2010-01-01

    This report summarizes GENERATE, a pilot research project conducted by 12 artists and their children 3-14. Simply put, these artist/art educator/parents allowed their own children unlimited access to their studios, materials, equipment and workspaces for two years. During that time the children were able to work alongside their parents on making…

  2. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  3. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  4. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  5. Ergonomic project of the work and innovation in the virtual-actual dynamic: a theoretical-conceptual contribution

    Directory of Open Access Journals (Sweden)

    Gilbert Cardoso Bouyer

    2015-12-01

    Full Text Available The main purpose of this paper is to amplify the current theoretical scenario of “Ergonomics of Project” area, according to the knowledge creation/innovation theory, and his concepts of virtual and subjectivity in the Work. This theoretical-conceptual article aims to shed new light on the relations between innovation and present-day efforts toward a scientific theory of knowledge in the Work, with its complex structure of theories, hypotheses and disciplines. There is in this paper a new approach to understand  the Contemporary Ergonomic Project in a kind of Socio-Epistemological Engineering initiated by Markus F. Peschl in the University of Vienna. The methods employed were the systematic review and adaptation of Socio-Epistemological Engineering’s concepts in the actual context of epistemological and ontological principles of Ergonomics of Project.

  6. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO)

  7. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  8. Report on the research and development work of 1984 in the project atomic fusion

    International Nuclear Information System (INIS)

    Finken, D.

    1985-02-01

    The work done by the Nuclear Research Centre in Karlsruhe on fusion under magnetic influence is compiled in the project atomic fusion and put in the programme for European Fusion Technology. The work is supported by an association contract between KfK and Euratom via the European Commission. Some of the work exceeds the volume defined in the E.E.C's technology programme. Using these papers, mostly studies, connections are established between the various fields of work and new tasks prepared. This is taking place in the light of the expected extension of the technology programme in the coming year and the plans for NET. The reports compiled here are the 1984 papers from the KfK institute. The appendix contains a compilation of the tasks undertaken by KfK from the EEC's fusion technology programme. (orig./GG) [de

  9. Identification of Design Work Patterns by Retrospective Analysis of Work Sheets

    DEFF Research Database (Denmark)

    Hansen, Claus Thorp

    1999-01-01

    project is carried out where we seek to identify design work patterns by retrospective analysis of documentation created during design projects.An elements to satisfy the wish for an efficient design process could be to identify work patterns applied by engineering designers, evaluate these patterns...... with respect to their efficiency, and reuse the most efficient in future projects. Thus, the objective of this research is to analyse design projects in order to identify the work patterns applied. Based on an evaluation of identified work patterns we expect a recommendation of work patterns supporting...... an efficient design process can be established.In this paper we describe the analysis method, and present observations from analyses of three projects....

  10. Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa

    Science.gov (United States)

    2014-01-01

    Background Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. Methods A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Results Forty-four studies on mHealth projects in Africa were included and classified as: “patient follow-up and medication adherence” (n = 19), “staff training, support and motivation” (n = 2), “staff evaluation, monitoring and guidelines compliance” (n = 4), “drug supply-chain and stock management” (n = 2), “patient education and awareness” (n = 1), “disease surveillance and intervention monitoring” (n = 4), “data collection/transfer and reporting” (n = 10) and “overview of mHealth projects” (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or

  11. EASYTRACK Project: Work package 3

    DEFF Research Database (Denmark)

    Savio, Enrico; De Chiffre, Leonardo

    ). For this project, the Centre for Geometrical Metrology (CGM) at the Technical University of Denmark (DTU) has taken care of freeform measurements, in collaboration with the Dipartimento di Innovazione Meccanica e Gestionale (DIMEG) - University of Padova - Italy. The present report describes feasibility...... and experimental results of calibrations of freeform parts on CMMs as contribution to development of the ISO 15530 series of standards currently under consideration by the ISO TC 213/WG10....

  12. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  13. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  14. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  15. Social assessment of energy projects. How?

    International Nuclear Information System (INIS)

    Munksgaard, J.; Larsen, A.

    1997-08-01

    This is the final report of the project: Social assessment of Energy Projects. The aim of the project is to improve the basis of working out social assessments of energy projects in practice. The report raises the question: How should social assessments of energy projects be made? A social assessment is using a national perspective, i.e. it accounts the effects of the project for individuals and institutions in Denmark. The assessment is based on economics which means that effects generated by the project are valuated in DKK - as far as possible. The aim of the social assessment is to support a more effective use of the resources in Denmark. A social assessment should include an analysis of the distributional effects. The analysis can be made as an account including a social cash flow analysis. The distribution analysis will illustrate the gains and losses for the different groups of individuals affected carrying out the project. In that way the analysis will show who potentially will support the project and who will be against the project. (EG) EFP-92. 37 refs

  16. The Kintyre uranium project

    International Nuclear Information System (INIS)

    Larson, B.

    1997-01-01

    The Kintyre Uranium Project is being developed by Canning Resources Pty Ltd, a subsidiary of Rio Tinto (formerly CRA). The work on the project includes the planning and management of a number of background environmental studies. The company has also commissioned studies by external consultants into process technologies, mining strategies and techniques for extracting the uranium ore from the waste rock. In addition, Canning Resources has made a detailed assessment of the worldwide market potential for Australian uranium in the late 1990s and into the 21st century. The most significant factor affecting the future of this project is the current product price. This price is insufficient to justify the necessary investment to bring this project into production

  17. Flexible working hours, health, and well-being in Europe: some considerations from a SALTSA project

    NARCIS (Netherlands)

    Costa, Giovanni; Akerstedt, Torbjorn; Nachreiner, Friedhelm; Baltieri, Federica; Carvalhais, José; Folkard, Simon; Frings-Dresen, Monique; Gadbois, Charles; Gartner, Johannes; Sukalo, Hiltraud Grzech; Härmä, Mikko; Kandolin, Irja; Sartori, Samantha; Silvério, Jorge

    2004-01-01

    The project brought together researchers from 9 EU-Countries and resulted in a number of actions, in particular the following: (a) There is an urgent need of defining the concept of flexible working hours, since it has been used in many different and even counterintuitive ways; the most obvious

  18. CMIP5-based global wave climate projections including the entire Arctic Ocean

    Science.gov (United States)

    Casas-Prat, M.; Wang, X. L.; Swart, N.

    2018-03-01

    This study presents simulations of the global ocean wave climate corresponding to the surface winds and sea ice concentrations as simulated by five CMIP5 (Coupled Model Intercomparison Project Phase 5) climate models for the historical (1979-2005) and RCP8.5 scenario future (2081-2100) periods. To tackle the numerical complexities associated with the inclusion of the North Pole, the WAVEWATCH III (WW3) wave model was used with a customized unstructured Spherical Multi-Cell grid of ∼100 km offshore and ∼50 km along coastlines. The climate model simulated wind and sea ice data, and the corresponding WW3 simulated wave data, were evaluated against reanalysis and hindcast data. The results show that all the five sets of wave simulations projected lower waves in the North Atlantic, corresponding to decreased surface wind speeds there in the warmer climate. The selected CMIP5 models also consistently projected an increase in the surface wind speed in the Southern Hemisphere (SH) mid-high latitudes, which translates in an increase in the WW3 simulated significant wave height (Hs) there. The higher waves are accompanied with increased peak wave period and increased wave age in the East Pacific and Indian Oceans, and a significant counterclockwise rotation in the mean wave direction in the Southern Oceans. The latter is caused by more intense waves from the SH traveling equatorward and developing into swells. Future wave climate in the Arctic Ocean in summer is projected to be predominantly of mixed sea states, with the climatological mean of September maximum Hs ranging mostly 3-4 m. The new waves approaching Arctic coasts will be less fetch-limited as ice retreats since a predominantly southwards mean wave direction is projected in the surrounding seas.

  19. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  20. A systematic review including meta-analysis of work environment and depressive symptoms.

    Science.gov (United States)

    Theorell, Töres; Hammarström, Anne; Aronsson, Gunnar; Träskman Bendz, Lil; Grape, Tom; Hogstedt, Christer; Marteinsdottir, Ina; Skoog, Ingmar; Hall, Charlotte

    2015-08-01

    Depressive symptoms are potential outcomes of poorly functioning work environments. Such symptoms are frequent and cause considerable suffering for the employees as well as financial loss for the employers. Accordingly good prospective studies of psychosocial working conditions and depressive symptoms are valuable. Scientific reviews of such studies have pointed at methodological difficulties but still established a few job risk factors. Those reviews were published some years ago. There is need for an updated systematic review using the GRADE system. In addition, gender related questions have been insufficiently reviewed. Inclusion criteria for the studies published 1990 to June 2013: 1. European and English speaking countries. 2. Quantified results describing the relationship between exposure (psychosocial or physical/chemical) and outcome (standardized questionnaire assessment of depressive symptoms or interview-based clinical depression). 3. Prospective or comparable case-control design with at least 100 participants. 4. Assessments of exposure (working conditions) and outcome at baseline and outcome (depressive symptoms) once again after follow-up 1-5 years later. 5. Adjustment for age and adjustment or stratification for gender. Studies filling inclusion criteria were subjected to assessment of 1.) relevance and 2.) quality using predefined criteria. Systematic review of the evidence was made using the GRADE system. When applicable, meta-analysis of the magnitude of associations was made. Consistency of findings was examined for a number of possible confounders and publication bias was discussed. Fifty-nine articles of high or medium high scientific quality were included. Moderately strong evidence (grade three out of four) was found for job strain (high psychological demands and low decision latitude), low decision latitude and bullying having significant impact on development of depressive symptoms. Limited evidence (grade two) was shown for psychological

  1. Antelope--Fossil rebuild project

    International Nuclear Information System (INIS)

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project

  2. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  3. 76 FR 29797 - Westpoint Home, Inc., New York Corporate Sales Office, New York, NY, Including Employees Working...

    Science.gov (United States)

    2011-05-23

    ... Home, Inc., New York Corporate Sales Office, working off-site in Illinois, Georgia, Minnesota, Indiana...,218B, TA-W-74,218C, TA-W-74,218D] Westpoint Home, Inc., New York Corporate Sales Office, New York, NY, Including Employees Working Off-Site in Illinois, Georgia, Minnesota, Indiana, North Carolina; Westpoint...

  4. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  5. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  6. The interdisciplinary nature of the skills needed by project managers

    Directory of Open Access Journals (Sweden)

    Trevor Nesbit

    Full Text Available The purpose of this paper is to explore and analyse the additional skills that are transferrable across different sectors, that project managers require and that go beyond technical project management skills to enable them to be successful in what is becoming an increasingly interdisciplinary role.The conclusions highlight that the project management role requires a range of non- technical project management skills and characteristics to enable project management to be carried out successfully. These non- technical project management skills and characteristics include the ability to build relationships with stakeholders; possessing formal project management certification; understanding the creation and functioning of project teams; understanding the political environment that the project exists in; the ability to work in a team; possessing leadership and management skills; possessing interpersonal and communication skills and possessing a strategic orientation.The skills and characteristics that are perceived by the cross section of project managers as being the most important are possessing interpersonal and communication skills; possessing leadership and management skills; the ability to work in a team and the ability to build relationships with stakeholders. Interpersonal and communication skills along with the ability to work in a team are not included significantly in job advertisements for project managers, with the requirement to have them potentially being assumed and not needed to be stated.This research provides a basis for a further study involving in-depth interviews with project managers from the information technology sector with the aim of highlighting specific projects where these additional skills have been vital to the success of these projects.Issues surrounding the political environment of the project from the perspective of different genders; the importance interpersonal and communication skills along with team work for

  7. Including Energy Efficiency and Renewable Energy Policies in Electricity Demand Projections

    Science.gov (United States)

    Find more information on how state and local air agencies can identify on-the-books EE/RE policies, develop a methodology for projecting a jurisdiction's energy demand, and estimate the change in power sector emissions.

  8. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  9. Understanding the Meaning of “Project Success”

    Directory of Open Access Journals (Sweden)

    Goparaju Purna Sudhakar

    2016-09-01

    Full Text Available Fortune 500 organizations are executing their tasks using projects. Project management is the area of concentration across the world. Different stakeholders have a different perspective about project success. The meaning of project success had been explained in this article. In addition, the Project Critical Success Factors (CSFs were mentioned. The research of Standish Group on project success and project success metrics was presented. Earlier research on the meaning of project success and project critical success factors was highlighted. The works of Jeffery K. Pinto and Dennis P. Slevin, David and Adam, DeLone and McLean, and The Standish Group Research were discussed in this article. The methodology included secondary research based on literature view of prominent empirical studies and the literature reviews by making note of findings and observations from those studies. The initial literature collected led to further search of articles based on their references. The research findings indicate that the top of the most success factors for many projects include project objective, top management commitment, competent project team, and user involvement.

  10. Advanced engineering environment collaboration project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-12-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

  11. Advanced engineering environment collaboration project

    International Nuclear Information System (INIS)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-01-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications

  12. The Web as process tool and product environment for group-based project work in higher education

    NARCIS (Netherlands)

    Collis, Betty; Andernach, Toine; van Diepen, N.M.; Maurer, Hermann

    1996-01-01

    This paper discusses problems confronting the use of group-based project work as an instructional strategy in higher education, and describes two technical courses (i.e., courses in online learning and applications of business information technology) at the University of Twente (Netherlands) in

  13. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  14. DEVELOPMENT OF DIGITAL COMPETENCIES OF PRIMARY SCHOOL TEACHERS THROUGH BUILDING KNOWLEDGE AND SKILLS FOR WORKING WITH VISUAL PROGRAMMING ENVIRONMENT WITHIN MATH PROJECT WORK

    Directory of Open Access Journals (Sweden)

    Rumyana Y. Papancheva

    2017-07-01

    Full Text Available The paper presents a review of the contemporary school, the digital generation and the need of teachers equipped with new knowledge and skills, in particular – basic programming skills. The last change of educational system in Bulgaria after the adoption of the new pre-school and general school education act is analysed. New primary school curricula and new standards for teacher’s qualification were implemented. The new school subject “Computer modelling” is presented. Some experience of the authors from project-based work in mathematics with teachers and students is described. The aim is the formation of skills of programming by working within Scratch – visual environment for block-based coding. Some conclusions and ideas for future work are formulated.

  15. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  16. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  17. Learning network theory : its contribution to our understanding of work-based learning projects and learning climate

    NARCIS (Netherlands)

    Poell, R.F.; Moorsel, M.A.A.H. van

    1996-01-01

    This paper discusses the relevance of Van der Krogt's learning network theory (1995) for our understanding of the concepts of work-related learning projects and learning climate in organisations. The main assumptions of the learning network theory are presented and transferred to the level of

  18. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  19. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  20. New way of working: Professionals' expectations and experiences of the Culture and Health Project for clients with psychiatric disabilities: A focus group study.

    Science.gov (United States)

    Wästberg, Birgitta A; Sandström, Boel; Gunnarsson, Anna Birgitta

    2018-02-01

    There is a need for various types of interventions when meeting needs of clients with psychiatric disabilities and complementary interventions may also influence their well-being. The Culture and Health project, based on complementary interventions with 270 clients, was created in a county in Sweden for clients with psychiatric disabilities and for professionals to carry out the interventions. The aim of this study was to investigate the professionals' expectations regarding the project and their clients' possibilities for participating, and to investigate the professionals' experiences of the project after its completion. Focus group data with a total of 30 professionals participating were collected. A qualitative content analysis revealed four categories of the professionals' expectations before entering the project: "Clients' own possibilities and limitations for their development and independence", "Professionals' possibilities for supporting the clients", "Societal prerequisites", and "Expectations of a new way of working". Furthermore, the analysis regarding professionals' experiences after working with the project revealed three categories: "Adopting the challenges", "Having ways of working that function - prerequisites and possibilities", and "Meeting the future - an ambition to continue". Working in the Culture and Health project together with the clients in group-based activities was perceived as beneficial, although challenges arose. When implementing cultural activities, support from stakeholder organisations is needed. © 2017 Australian College of Mental Health Nurses Inc.

  1. Teaching and Learning English through the Project Work. Innovative Pilot Teaching Project in the Pre-school and Primary School Pompeu Fabra, Vallirana, Barcelona. Investigation in Action comprehension in Primary Education

    Directory of Open Access Journals (Sweden)

    Verónica Asensio Arjona

    2017-12-01

    Full Text Available In order to impulse a methodology focused on the student, teachers have to establish the learning conditions that allow them to develop the experimentation, creativity, challenge and individual development. Below this framework, a Project Work of Teaching-Learning English as a foreign language is designed and applied at the state school Pompeu Fabra, Vallirana, Barcelona during the scholar year 2013-2014. The methodology of project work is chosen because it is the most appropriated methodology to achieve a learning focused on the student. It is executed an Action Research of the application of this Project in order to evaluate the competential progress of students. Quantitative and qualitative tools are used to execute the research. The quantitative tools are a standardized test and a Survey. The first one is applied in two moments, in October and in June, to evaluate the progress. The results are analyzed with Excel Tools to calculate the general average and each competence average. On the other hand, the qualitative tools that are used are: The Satisfaction and Self-perception Survey, validated by the University of Barcelona; the Teacher Diary of Observation; and an Evaluation Table for the Speaking. The triangulation of all the information show the English competence of student’s increase; as well as the interest of students in the English learning and the satisfaction in doing it also increases. Moreover, the Project Work is highly qualified by students as: the best activity to learn and enjoy it. This research obtains satisfactory results. It is a sample of innovation in teaching and learning English as a foreign language. As a result, the school decides to continue using the Project Work in the next scholar year.

  2. Midwestern High-Level Radioactive Waste Transportation Project

    International Nuclear Information System (INIS)

    1993-01-01

    On February 17,1989, the Midwestern Office of The Council of State Governments and the US Department of Energy entered into a cooperative agreement authorizing the initiation of the Midwestern High-Level Radioactive Waste Transportation Project. The transportation project continued to receive funding from DOE through amendments to the original cooperative agreement, with December 31, 1993, marking the end of the initial 5-year period. This progress report reflects the work completed by the Midwestern Office from February 17,1989, through December 31,1993. In accordance with the scopes of work governing the period covered by this report, the Midwestern Office of The Council of State Governments has worked closely with the Midwestern High-Level Radioactive Waste Committee. Project staff have facilitated all eight of the committee's meetings and have represented the committee at meetings of DOE's Transportation Coordination Group (TCG) and Transportation External Coordination Working Group (TEC/WG). Staff have also prepared and submitted comments on DOE activities on behalf of the committee. In addition to working with the committee, project staff have prepared and distributed 20 reports, including some revised reports (see Attachment 1). Staff have also developed a library of reference materials for the benefit of committee members, state officials, and other interested parties. To publicize the library, and to make it more accessible to potential users, project staff have prepared and distributed regular notices of resource availability

  3. Balbina's region sustainable development project

    International Nuclear Information System (INIS)

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  4. The WorkQueue project - a task queue for the CMS workload management system

    Science.gov (United States)

    Ryu, S.; Wakefield, S.

    2012-12-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  5. The WorkQueue project - a task queue for the CMS workload management system

    International Nuclear Information System (INIS)

    Ryu, S; Wakefield, S

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  6. The WorkQueue project: A task queue for the CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, S. [Fermilab; Wakefield, Stuart [Imperial Coll., London

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  7. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  8. Analysis of the economic impact of environmental biosafety works projects in healthcare centres in extremadura (spain)

    OpenAIRE

    García Sanz-Calcedo, Justo; Monzón-González, Pedro

    2014-01-01

    The aim of this paper is to analyze the results obtained in the methodological application of techniques aimed at the maintenance of environmental biosafety in works of reform and expansion of healthcare centres in Extremadura, Spain during 2004-2010, assessing the costs of its implementation and contrasting if the use of a BSA project in phase of works affects the probability of nosocomial infection and the conditions of health and safety. The average investment accounted for a cost of 5.5 €...

  9. Improving Project Management Using Formal Models and Architectures

    Science.gov (United States)

    Kahn, Theodore; Sturken, Ian

    2011-01-01

    This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

  10. Los Alamos Science: The Human Genome Project. Number 20, 1992

    Science.gov (United States)

    Cooper, N. G.; Shea, N. eds.

    1992-01-01

    This document provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  11. Los Alamos Science: The Human Genome Project. Number 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, N G; Shea, N [eds.

    1992-01-01

    This article provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  12. Promises, Premises and Risks: Sharing Responsibilities, Working Up Trust and Sustaining Commitment in Participatory Design Projects

    DEFF Research Database (Denmark)

    Büscher, Monika; Hartswood, Mark; Mogensen, Preben Holst

    2002-01-01

    While participatory design crosses the boundaries between technology production and use, it does not erase them. In accounts of participatory projects, the work of negotiating and changing these boundaries often recedes into the background, yet it is crucial in shaping the very nature and scope o...

  13. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  14. A temperature dependent cyclic plasticity model for hot work tool steel including particle coarsening

    Science.gov (United States)

    Jilg, Andreas; Seifert, Thomas

    2018-05-01

    Hot work tools are subjected to complex thermal and mechanical loads during hot forming processes. Locally, the stresses can exceed the material's yield strength in highly loaded areas as e.g. in small radii in die cavities. To sustain the high loads, the hot forming tools are typically made of martensitic hot work steels. While temperatures for annealing of the tool steels usually lie in the range between 400 and 600 °C, the steels may experience even higher temperatures during hot forming, resulting in softening of the material due to coarsening of strengthening particles. In this paper, a temperature dependent cyclic plasticity model for the martensitic hot work tool steel 1.2367 (X38CrMoV5-3) is presented that includes softening due to particle coarsening and that can be applied in finite-element calculations to assess the effect of softening on the thermomechanical fatigue life of hot work tools. To this end, a kinetic model for the evolution of the mean size of secondary carbides based on Ostwald ripening is coupled with a cyclic plasticity model with kinematic hardening. Mechanism-based relations are developed to describe the dependency of the mechanical properties on carbide size and temperature. The material properties of the mechanical and kinetic model are determined on the basis of tempering hardness curves as well as monotonic and cyclic tests.

  15. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  16. Civilian Agency Industry Working Group EVM World Update

    Science.gov (United States)

    Kerby, Jerald

    2013-01-01

    Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.

  17. The EU-funded EuropeanaTravel project

    Directory of Open Access Journals (Sweden)

    Paul Ayris

    2009-10-01

    Full Text Available EuropeanaTravel is a targeted project for cultural content in the target area digital libraries of the eContentplus 2008 Work Programme funded by the European Commission. Its overall objective is to digitise content on the theme of travel and tourism for use in Europeana as requested by the EDL Foundation. The themed content will come from the wonderful collections of major university libraries and national libraries. The project is supported by CENL and LIBER, two founder members of the EDL Foundation, and by the Foundation itself. A secondary objective of the project is further to strengthen collaboration between CENL and LIBER by extending their experience of joint working, thus increasing human interoperability in support of Europeana. Other objectives include creating a LIBER closed access aggregation service to aggregate material from LIBER members for Europeana, continuing to mobilise support for Europeana amongst university libraries in a systematic way, and supporting the spread of best practice in digitisation by libraries. The consortium’s 19 members include 17 library members providing content from 16 countries drawn roughly equally from the membership of CENL and LIBER and from all European regions. The project will run for two years and work closely and flexibly with the Europeana team. The EuropeanaTravel project was launched in Tallinn on 11 May 2009 and this article has been compiled to celebrate that event.

  18. NASA Pathways: Intern Employment Program Work Report Summer 2014

    Science.gov (United States)

    Davidson, Kyle B.

    2014-01-01

    This report documents the work experience and project involvement of Kyle Davidson during his tenure at Kennedy Space Center for the summer of 2014. Projects include the Nitrogen Oxygen Recharge System (NORS), Restore satellite servicing program, and mechanical handling operations for the SAGE III and Rapidscat payloads.

  19. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  20. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  1. Predicting changes in sleep complaints from baseline values and changes in work demands, work control, and work preoccupation--the WOLF-project.

    Science.gov (United States)

    Åkerstedt, Torbjörn; Nordin, Maria; Alfredsson, Lars; Westerholm, Peter; Kecklund, Göran

    2012-01-01

    Stress as a cause of disturbed sleep is often taken for granted, but the longitudinal evidence is limited. The aim of this study was to evaluate new cases of poor sleep as a function of changes in reported work demands, work control, and work preoccupation. Longitudinal study of change with measures occurring twice within a 5-year interval during a period when the prevalence of impaired sleep was increasing in Sweden. The sample of companies was taken from northern Sweden (Norrland) and included 3637 individuals from the "WOLF Norrland" longitudinal cohort, collected through company health services. During the measurement period, 16% of those studied developed new cases of impaired sleep. Logistic regressions adjusted for demographics, work environment factors, and disturbed sleep at T1 period one showed a significant increase in new cases for high work demands and high work preoccupation (OR=1.37; Ci=1.09-1.72 and OR=1.80; CI=1.42-2.28, respectively). The analysis of change in the predictors showed effects of a change from low to high work demands (OR=1.39; Ci=1.00-1.95) on new cases of impaired sleep. Consistent high work demands (high at both points) showed a similar increase (OR=1.49; Ci=1.06-2.11) but no effect was seen for reduced demands. Change in work preoccupation yielded stronger effects with OR=2.47 (1.78-2.47) for increased work preoccupation and OR=3.79 (2.70-5.31) for consistent high work preoccupation. Also, a reduction in work preoccupation was associated with a reduction in new cases of disturbed sleep. Control at work was not related to sleep. Stratification with respect to gender mainly led to fewer significant results (particularly for women) due to larger confidence intervals. It was concluded that self-reported work preoccupation predicts subsequent impairment of sleep and that increased preoccupation is associated with new cases of impaired sleep. Similar, but weaker, results were obtained for work demands. Copyright © 2011 Elsevier B

  2. FY95 software project management plan: TMACS, CASS computer systems

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule

  3. The Key Lake project

    International Nuclear Information System (INIS)

    1991-01-01

    Key Lake is located in the Athabasca sand stone basin, 640 kilometers north of Saskatoon, Saskatchewan, Canada. The three sources of ore at Key Lake contain 70 100 tonnes of uranium. Features of the Key Lake Project were described under the key headings: work force, mining, mill process, tailings storage, permanent camp, environmental features, worker health and safety, and economic benefits. Appendices covering the historical background, construction projects, comparisons of western world mines, mining statistics, Northern Saskatchewan surface lease, and Key Lake development and regulatory agencies were included

  4. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  5. A project-based system for including farmers in the EU ETS

    DEFF Research Database (Denmark)

    Brandt, Urs Steiner; Svendsen, Gert Tinggaard

    2011-01-01

    as ‘the missing link’ in past climate negotiations. We argue that farmers have relatively low marginal reduction costs and that consequences in terms of the effect on permit price and technology are overall positive in the EU Emission Trading System (ETS). Thus, we propose a project-based system...

  6. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  7. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  8. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  9. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  10. Hanford analytical sample projections FY 1998 - FY 2002

    International Nuclear Information System (INIS)

    Joyce, S.M.

    1998-01-01

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs

  11. Hanford analytical sample projections FY 1998--FY 2002

    Energy Technology Data Exchange (ETDEWEB)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.

  12. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  13. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  14. Working by projects: A way to enrich critical thinking and the writing process in a third grade eflclassroom

    Directory of Open Access Journals (Sweden)

    Sandra Dolores Ruiz

    2014-01-01

    Full Text Available This document presents the result of a qualitative action research developed with thirty-three third grade students at a public school in Bogota. This action research aimed at describing and analyzing the role of project work in the development of critical thinking in third grade efl students and to describe and document the way in which those students developed their writing skills through this methodology. The participants developed different inquiries related to topics they were interested in exploring and related to the recycling project of the school. The data were collected during eleven sessions carried out along eight months through field notes, artifacts, and audio recordings. The results show that through project work the students enhanced their emerging critical thinking skills and their writing process; improved their interactions with their classmates, discovered that learning English was something useful for their lives, and therefore they acquired more confidence in writing and speaking in English. Additionally, they became more reflective, organized and critical about what they think, what they say, and about what happens around them.

  15. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  16. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  17. Site characterization activities at Stripa and other Swedish projects

    International Nuclear Information System (INIS)

    Ahlstroehm, P.E.

    1991-01-01

    The Swedish research programme concerning spent nuclear fuel disposal aims for submitting a siting license application around the year 2000. An important step towards that goal will be the detailed characterization of at least two potential sites in late 1990s. In preparation for such characterization several research projects are conducted. One is the international Stripa Project that includes a site characterization and validation project for a small size granite rock body. The Stripa work also includes further development of instrumentation and measurement techniques. Another project is the Finnsjoen Fracture Zone Project, which is characterizing a subhorizontal zone at depths from 100 to 350 meters. The third project is the new Swedish Hard Rock Laboratory planned at the site of the Oskarshamn nuclear power plant. The preinvestigations and construction of this laboratory include major efforts in development, application and validation of site characterization methodology. (author) 6 figs., 9 refs

  18. Equal Opportunity, Equal Work: Increasing Women's Participation in the U.S. President's Malaria Initiative Africa Indoor Residual Spraying Project.

    Science.gov (United States)

    Donner, Abigail; Belemvire, Allison; Johns, Ben; Mangam, Keith; Fiekowsky, Elana; Gunn, Jayleen; Hayden, Mary; Ernst, Kacey

    2017-12-28

    One of the primary control measures for malaria transmission is indoor residual spraying (IRS). Historically, few women have worked in IRS programs, despite the income-generating potential. Increasing women's roles in IRS requires understanding the barriers to women's participation and implementing measures to address them. The U.S. President's Malaria Initiative (PMI) Africa Indoor Residual Spraying (AIRS) Project is the largest implementer of IRS globally. To address gender inequity in IRS operations, PMI AIRS assessed the barriers to the participation of women and developed and implemented policies to address these barriers. The PMI AIRS Project initially identified barriers through a series of informal assessments with key stakeholders. PMI AIRS then implemented a series of gender-guided policies, starting in 2015, in Benin, Ethiopia, Ghana, Mali, Madagascar, Mozambique, Rwanda, Senegal, Zambia, and Zimbabwe. The policies included adapting physical work environments to ensure privacy for women; ensuring the safety of women in the workplace; guaranteeing safety and job security of women during pregnancy; and encouraging qualified women to apply for supervisory positions. The project collected routine programmatic data on staff, spray quality, and spray efficiency; data from 2012 through the end of 2015 were analyzed (up through 1 year after implementation of the gender policies). In addition, PMI AIRS conducted surveys in 2015, 2016, and 2017 before and after the spray campaigns in 4 countries to determine changes in gender norms among spray operators through questions about decision making and agency. The PMI AIRS Project increased women's employment with the program. Specifically, women's employment increased overall from 23% in 2012 to 29% in 2015, with a 2015 range from 16% (Mali) to 40% (Madagascar). Growth among supervisor roles was even stronger, with the percentage of women in supervisory roles increasing from 17% in 2012 to 46% in 2015, with a 2015

  19. PROJECT-BASED LEARNING IN ENGLISH FOR MEDICINE

    Directory of Open Access Journals (Sweden)

    Zorica Antić

    2012-06-01

    Full Text Available Project-based learning facilitates hands-on learning in student-driven investigations, resulting in high-quality, challenging activities. Students participate actively in projects that revolve around their interests, questions or needs. PBL also develops the 21st century skills including critical thinking, collaboration and communication. The essence of PBL is problem-solving, a key critical thinking skill. Since problem-solving is an integral part of medicine, projects represent a significant method of instruction in English for Medical Purposes. Depending on their individual interests and abilities, each student contributes to the whole group work and the final outcome. The approach also requires students to work in teams and to communicate their findings. Using real-life problems to motivate students, challenging them to think deeply about meaningful content, and enabling them to work collaboratively are practices that yield benefits for all students and their future careers.

  20. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  1. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  2. Work-based Project Overcomes Basic Skills Stigma.

    Science.gov (United States)

    Wallis, Emma

    2002-01-01

    A project to provide steel workers in North Wales with guidance about learning opportunities and to promote lifelong learning in the workplace focused on the development of basic information technology skills. (JOW)

  3. Transformational Leadership and Proactive Work Behavior: A Moderated Mediation Model Including Work Engagement and Job Strain

    NARCIS (Netherlands)

    Schmitt, A.; den Hartog, D.N.; Belschak, F.D.

    2016-01-01

    This study explores the role of work engagement as an affective–motivational mechanism through which transformational leadership may relate to proactive behaviour. In line with a resource-based approach (Hobfoll, 1989), we hypothesize that employees only invest resources provided through work

  4. Institutional Ethnography as Materialist Framework for Writing Program Research and the Faculty-Staff Work Standpoints Project

    Science.gov (United States)

    LaFrance, Michelle; Nicolas, Melissa

    2012-01-01

    Institutional ethnography seeks to uncover how things happen--how institutional discourse compels and shapes practice(s) and how norms of practice speak to, for, and over individuals. The Faculty and Staff Standpoints project is shaped by this methodology, as it explores writing center staff and faculty relationships to their work. (Contains 10…

  5. A Preliminary Review of U.S. Forest Service Business Practices To Authorize Special Uses, Including Energy Infrastructure Projects, on National Forest System Lands

    Energy Technology Data Exchange (ETDEWEB)

    Wescott, K. L. [Argonne National Lab. (ANL), Argonne, IL (United States); May, J. E. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, H. R. [Argonne National Lab. (ANL), Argonne, IL (United States); Brunner, D. L. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-01

    The U.S. Forest Service (USFS) Special Uses-Lands Program is in jeopardy. Although this program, authorized in Title 36, Part 251, of the U.S. Code of Federal Regulations (36 CFR Part 251), ranks among the top four revenue-generating programs for use of National Forest System (NFS) lands, along with the Timber, Minerals, and Special Uses-Recreation Programs, the Special Uses-Lands Program is in a state of neglect. Repeated cuts in funding (a decrease of 26% from fiscal years 2010 to 2014) are adversely affecting staffing and training, which in turn is affecting timely permit processing and ultimately the public’s ability to use and benefit from NFS lands. In addition, highly experienced staff with valuable institutional knowledge of the program have begun to retire. The ability of the program to function under these dire circumstances can be attributed to the dedication of Special Uses staff to the program and their commitment to the public. The initial focus of this report was to identify opportunities for improving performance of permitting and review for large energy infrastructure-related projects. However, it became clear during this analysis that these projects are generally adequately staffed and managed. This is due in large part to the availability of cost-recovery dollars and the high-profile nature of these projects. However, it also became apparent that larger issues affecting the bulk of the work of the Special Uses-Lands Program need to be addressed immediately. This report is a preliminary examination of the state of the Special Uses-Lands Program and focuses on a few key items requiring immediate attention. Further investigation through case studies is recommended to dig deeper into the Special Uses-Lands Program business process to determine the most costeffective strategies for streamlining the overall process and the metrics by which performance can be evaluated, including for the permitting and tracking of energy infrastructure projects.

  6. IPAD project overview

    Science.gov (United States)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  7. Pupils' Views about Spiders. Learning in Science Project (Primary). Working Paper No. 123.

    Science.gov (United States)

    Hawe, Eleanor

    The Learning in Science Project (Primary)--LISP(P)--investigated the ideas and interests about spiders held by 8- to 10-year-old children. Data included 303 questions--and answers to some of the questions--about spiders obtained from children in four classes and from responses obtained during individual interviews with 10 children from each age…

  8. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  9. Two studies: working in public

    OpenAIRE

    Sleeper, Clinton James

    2014-01-01

    Two Studies: Working in Public is comprised of release of an artist book and the presentation of several large-scale projections created from original recombinant video. Developed around research into generosity, maintenance, urbanism, and novel practices, this ambitious investigation of Mierle Laderman Ukeles’ Manifesto for Maintenance Art includes a generative video system; which sorts through source footage of the artist repairing public benches and playgrounds. The artwork also includes a...

  10. Nuclear Safety Project - annual report 1980

    International Nuclear Information System (INIS)

    1981-08-01

    The Annual Report 1980 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1980 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work completed, essential results, plans for the near future. (orig./RW) [de

  11. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  12. Public Health Nurses in Israel: A Case Study on a Quality Improvement Project of Nurse's Work Life.

    Science.gov (United States)

    Kagan, Ilya; Shachaf, Sara; Rapaport, Zofia; Livne, Tzipi; Madjar, Batya

    2017-01-01

    Public health nurses (PHNs) working in Well Baby Clinic in Israel's Haifa district were voicing great distress to inspectors-the impossibility of meeting their workload, feeling overwhelmed, poor physical, and technological conditions. They were feeling tired and frustrated and burn-out was rising. The district's nursing management took the decision, together with Tel Aviv University's nursing research unit, to conduct a quality improvement project based on issues that arose from meetings with focus groups on the nurses' difficulties. This paper is a case study of a quality improvement project targeting nurses daily working life. One of its chief contributions is as a study of meeting PHNs' frustration by integrating focus groups and round-table brainstorming (involving nurses, clinic managers and nursing inspectors) in order to identify targets for practical intervention. This strategy has been very successful. It has provided the district's nursing management a battery of forcefully argued and realistically grounded proposals for making the work of Well Baby clinics more relevant to their communities and giving nurses (a) the conditions to meet their assignments and (b) greater professional self-respect. © 2016 Wiley Periodicals, Inc.

  13. NOAA's Coral Reef Conservation Program's 2016 Projects that Work Towards Stratefic Goals to Reduce Fishing Impacts on Coral

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In 2016 the following projects will take place to work towards CRCP's strategic goals to reduce fishing impacts on coral reefs Building GIS Long-term Capacity:...

  14. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  15. Research work for improving LWR safety

    International Nuclear Information System (INIS)

    Bork, G.

    1993-09-01

    The work performed in 1992 for the PSF project centers on various phenomena of severe fuel damage and on selected aspects of a core meltdown accident, relating to aerosol behaviour and filter engineering, and to methods of assessing and minimizing the radiological impacts of a reactor accident. The 1992 task programme of the project included research into extreme load conditions affecting the containment in a core meltdown accident: first results are given of the experiments performed. (orig./HP) [de

  16. Undernutrition and its determinants among daily laborers working in Cobblestone project in Ethiopia

    Directory of Open Access Journals (Sweden)

    Geteneh Moges

    2016-01-01

    Full Text Available Background Undernutrition is among the most significant public health problems in the world. It is an important underlying cause of illness and death in Africa and imposes a huge cost both in human and economic terms. The aim of this study is to assess the level of undernutrition and its determinants among daily laborers working in cobblestone projects, Yeka Sub City, Addis Ababa, Ethiopia. Methods A workplace-based cross-sectional study was conducted among 423 cobblestone daily laborers from February 20 to April 1, 2015. Systematic random sampling method was employed (with proportional allocation in three cobblestone project sites. An interviewer-administered questionnaire and anthropometric measurements (weight and height were used to collect the data. The data was entered by Epi Info version 3.5.3 then transferred to SPSS version 20 for data analysis. Results Overall, 423 respondents (of which 300, or 71%, were male participated in this study, making the response rate 100%. Among the study participants, 141 (33.3%; 95% CI: 28.8 - 38.0 were underweight (BMI<18.50. Males were more likely to experience underweight than their female counterparts: 112 (37.3% versus 29 (23.6%. Educational status, family size, income, dietary diversity and smoking had statistical significance with undernutrition in multivariate analysis. Study participants who had no education were significantly more likely to be undernourished [AOR = 7.83; 95% CI (3.78, 16.22] compared with those above secondary level education. Daily laborers with a larger family size (≥3 were three times [AOR=2.88; 95%CI; 1.54-5.40] more likely to be undernourished compared to low family size (≤2. Daily laborers who had low monthly income (<1500 ETB were significantly more likely to be undernourished [AOR= 9.77; 95%CI (4.92, 19.39] than those with high income (≥2500 ETB. Daily laborers who smoke were significantly more likely to be undernourished [AOR = 2.02; 95% CI (1.06 – 3

  17. Adjuvant occupational therapy for work-related major depression works: randomized trial including economic evaluation

    NARCIS (Netherlands)

    Schene, Aart H.; Koeter, Maarten W. J.; Kikkert, Martijn J.; Swinkels, Jan A.; McCrone, Paul

    2007-01-01

    BACKGROUND: Major depression has far-reaching consequences for work functioning and absenteeism. In most cases depression is treated by medication and clinical management. The addition of occupational therapy (OT) might improve outcome. We determined the cost-effectiveness of the addition of OT to

  18. [Project work: formation of health-care personnel for self-care of tunnelled central venous catheters in hemodialysis patients of the territory].

    Science.gov (United States)

    Morale, Walter; Patanè, D; Incardona, C; Seminara, G; Malfa, P; L'Anfusa, G; Calcara, G; Bisceglie, P; Puliatti, D; Di Landro, D

    2013-01-01

    the stakeholder as well as a swot analysis on the feasibility of the project were used to determine ad interim and final targets of the study. A summary of operative planning is included to explain in greater detail the study design, timing and costs of the various phases. Risk management and corrective measures adopted during the project are also mentioned and monitoring of the phases is described in relation to the fulfilling of intermediate goals. The prompt correction of mistakes allows for safer realisation of outcomes. From our experience with this work project, we can conclude that a more accurate management of tCVCs can significantly reduce the morbidity and mortality of patients. The project offers a positive cost-benefit balance through a decrease in costs of hospitalisation for tCVC-related infections and other life.threatening conditions related to the use of tCVCs an important goal for any spending review.

  19. Knowledge Creation Through Development Projects

    DEFF Research Database (Denmark)

    Laursen, Erik

    2010-01-01

    The focus of the paper is set on efforts to produce and manage organizational learning and development through engagement in organizational development projects, involving the implementation of new methods, new technologies and new ways of organizing the work processes. The issues discussed...... study of four organizational development projects (covering the organizations as a whole) held by four Danish High Schools (“gymnasium”). The study included questionnaires as well as interviews with the management and staff, plus a survey of selected written materials and documents. The purpose...... of the paper is to describe the activities, actually organized by the projects., as well as the various ways in which different groupings among the staff and the management are relating to the project. A special focus is set on the different perspectives on the projects established by the staff...

  20. American Recovery and Reinvestment Act: Clean Cities Project Awards

    Energy Technology Data Exchange (ETDEWEB)

    2016-08-01

    Each Clean Cities project award under the American Recovery and Reinvestment Act included a diverse group of stakeholders who worked together to lay the foundation for their communities to adopt alternative fuels and petroleum reduction strategies. This document provides a snapshot of the impact of each project and highlights the partners and Clean Cities coalitions who helped transform local and regional transportation markets through 25 projects impacting 45 states.

  1. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  2. Biorefinery Demonstration Project Final Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, David [University of Georgia Research Foundation, Inc., Athens, GA (United States)

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  3. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  4. Characteristics of the Process of Culture Development Project Activities (Culture of Social Engineering) at the Future Bachelors of Social Work

    Science.gov (United States)

    Nikitina, Natalya I.; Romanova, Elena Yu.; Vasilyeva, Tatyana V.; Nikishina, Irina N.; Grebennikova, Veronica M.

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate's (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of…

  5. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to

  6. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    International Nuclear Information System (INIS)

    Walker, Randy M.; Gross, Ian G.; Smith, Cyrus M.; Hill, David E.

    2011-01-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  7. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  8. Working Relationships for Sustainability: Improving Work-based Relationships in Local Government to bring about Sustainability Goals

    Directory of Open Access Journals (Sweden)

    Jade Herriman

    2012-08-01

    Full Text Available There’s no escape: we are always in relationship. Being aware of this matters. Doing something to build constructive relationships for sustainability, matters even more. This paper considers the connection between good relationships and effective sustainability work in local government. It draws on the collective experiences of four practitioners who have worked over many years in, with or for local government and argues that a good deal of project success is contingent upon the development of positive relationships with stakeholders, contractors, communities, businesses, colleagues, partners and other agencies and agency officers. Relationships can help or hinder project process, progress and outcomes. This paper identifies some approaches for building quality relationships and uses examples to highlight these strategies. These include: recognising that developing and maintaining resilient relationships and high quality communication is a critical foundation for success; designing projects with explicit relationship outcomes; and allocating time, money and other resources to support the development of effective relationships.

  9. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  10. Lead user projects in practice

    DEFF Research Database (Denmark)

    Brem, Alexander; Gutstein, Adele

    2018-01-01

    Earlier research on the lead user method is focused on individual case studies and how the method was applied in a specific context. In this paper, we take a broader approach, analyzing a sample of 24 lead user projects, which included working with 188 lead users. These projects were analyzed....... Moreover, crowdsourcing contests and netnography proved to be of significant value for the need, trend, and lead user identification phases. This paper concludes by discussing theoretical and practical implications, the limitations of this study, and recommendations for future studies....

  11. Promoting Safe Work for Young Workers: A Community-Based Approach. A Resource Guide Documenting the Experiences of Three Young Worker Projects.

    Science.gov (United States)

    Bush, Diane; Gonzalez-Arroyo, Michele; Stock, Laura; Delp, Linda; Miara, Christine; Dewey, Robin; Sinclair, Raymond C.; Ortega, Maria J.

    This guide presents the lessons learned from three health education projects that focused on young worker issues and were funded by the National Institute for Occupational Safety and Health. In these projects, occupational health educators worked for 3 years, in three different communities, to raise the awareness of young worker issues, including…

  12. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  13. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  14. Smart Grid Communications Security Project, U.S. Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, Frank [Univ. of Colorado, Boulder, CO (United States)

    2012-09-01

    There were four groups that worked on this project in different areas related to Smart Girds and Security. They included faculty and students from electric computer and energy engineering, law, business and sociology. The results of the work are summarized in a verity of reports, papers and thesis. A major report to the Governor of Colorado’s energy office with contributions from all the groups working on this project is given bellow. Smart Grid Deployment in Colorado: Challenges and Opportunities, Report to Colorado Governor’s Energy Office and Colorado Smart Grid Task Force(2010) (Kevin Doran, Frank Barnes, and Puneet Pasrich, eds.) This report includes information on the state of the grid cyber security, privacy, energy storage and grid stability, workforce development, consumer behavior with respect to the smart grid and safety issues.

  15. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  16. Polyfire project- an example of an industrial research project promoting safe industrial production of fire-resistant nanocomposites

    International Nuclear Information System (INIS)

    Vaquero, C; Lopez de Ipina, J; Galarza, N; Hargreaves, B; Weager, B; Breen, C

    2011-01-01

    New developments based on nanotechnology have to guarantee safe products and processes to be accepted by society. The Polyfire project will develop and scale-up techniques for processing halogen-free, fire-retardant nanocomposite materials and coatings based on unsaturated polyester resins and organoclays. The project includes a work package that will assess the Health and Environmental impacts derived from the manipulation of nanoparticles. This work package includes the following tasks: (1) Identification of Health and Environment Impacts derived from the processes, (2) Experimentation to study specific Nanoparticle Emissions, (3) Development of a Risk Management Methodology for the process, and (4) A Comparison of the Health and Environmental Impact of New and Existing Materials. To date, potential exposure scenarios to nanomaterials have been identified through the development of a Preliminary Hazard Analysis (PHA) of the new production processes. In the next step, these scenarios will be studied and simulated to evaluate potential emissions of nanomaterials. Polyfire is a collaborative European project, funded by the European Commission 7th Framework Programme (Grant Agreement No 229220). It features 11 partners from 5 countries (5 SMEs, 3 research institutes, 2 large companies, 1 association) and runs for three years (1st September 2009 - 31st August 2012). This project is an example of an industrial research development which aims to introduce to the market new products promoting the safe use of nanomaterials.

  17. Polyfire project- an example of an industrial research project promoting safe industrial production of fire-resistant nanocomposites

    Energy Technology Data Exchange (ETDEWEB)

    Vaquero, C; Lopez de Ipina, J; Galarza, N [TECNALIA, Leonardo Da Vinci No 11, 01510 Minano (Alava) (Spain); Hargreaves, B; Weager, B [NetComposites Ltd, 4A Broom Business Park, Chesterfield S41 9QG (United Kingdom); Breen, C, E-mail: celinav@leia.es [Materials and Engineering Research Institute, Sheffield Hallam University, Sheffield S1 1WB (United Kingdom)

    2011-07-06

    New developments based on nanotechnology have to guarantee safe products and processes to be accepted by society. The Polyfire project will develop and scale-up techniques for processing halogen-free, fire-retardant nanocomposite materials and coatings based on unsaturated polyester resins and organoclays. The project includes a work package that will assess the Health and Environmental impacts derived from the manipulation of nanoparticles. This work package includes the following tasks: (1) Identification of Health and Environment Impacts derived from the processes, (2) Experimentation to study specific Nanoparticle Emissions, (3) Development of a Risk Management Methodology for the process, and (4) A Comparison of the Health and Environmental Impact of New and Existing Materials. To date, potential exposure scenarios to nanomaterials have been identified through the development of a Preliminary Hazard Analysis (PHA) of the new production processes. In the next step, these scenarios will be studied and simulated to evaluate potential emissions of nanomaterials. Polyfire is a collaborative European project, funded by the European Commission 7th Framework Programme (Grant Agreement No 229220). It features 11 partners from 5 countries (5 SMEs, 3 research institutes, 2 large companies, 1 association) and runs for three years (1st September 2009 - 31st August 2012). This project is an example of an industrial research development which aims to introduce to the market new products promoting the safe use of nanomaterials.

  18. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  19. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  20. Lessons learned at the Fernald thorium removal project

    International Nuclear Information System (INIS)

    Boyd, R.

    1990-01-01

    In 1987, IT Corporation was awarded a subcontract through Rust Engineering Co. to provide decontamination and decommissioning services at the US Department of Energy Feed Materials Production Center (FMPC) near Fernald, Ohio. The work included the removal and repackaging of approximately 8,000 cubic feet of thorium oxide from several structures, including a silo, elevated bins, bucket elevators, and the silo understructure. The removal and repackaging project was undertaken because the integrity of the containment structures was questionable. Rust and Westinghouse (the operating contractor at FMPC) also felt that the repackaging and warehousing of the thorium would reduce occupational radiation exposure to site workers. Worker safety and environmental protection being of primary importance, the removal work was performed within specially-designed radiological containment facilities. The project presented challenges which, according to Westinghouse and Rust personnel, made it one of the most hazardous projects ever attempted at Fernald. Challenges included relations between non-union and union personnel, a strike by craft labor, interactions among DOE, EPA, and Westinghouse and their impact on a fixed-price contract, the impact of hazardous waste regulations, safe operations, and the contamination-free release of materials

  1. Tackling the work-life balance challenge in Professional Service Firms: the impact of projects, organizing and service characteristics

    NARCIS (Netherlands)

    Noury, L.C.; Gand, Sébastien; Sardas, Jean-Claude

    2017-01-01

    Professional Service Firms (PSFs) are currently under considerable pressure for economic reasons (low growth, pressure on cost), but also from the emergence of individual demands for work-life balance (WLB) from professionals, which challenge traditional ways of organizing both projects and careers.

  2. Factors associated with shift work disorder in nurses working with rapid-rotation schedules in Japan: the nurses' sleep health project.

    Science.gov (United States)

    Asaoka, Shoichi; Aritake, Sayaka; Komada, Yoko; Ozaki, Akiko; Odagiri, Yuko; Inoue, Shigeru; Shimomitsu, Teruichi; Inoue, Yuichi

    2013-05-01

    Workers who meet the criteria for shift work disorder (SWD) have elevated levels of risk for various health and behavioral problems. However, the impact of having SWD on shiftworkers engaged in rapid-rotation schedules is unknown. Moreover, the risk factors for the occurrence of SWD remain unclear. To clarify these issues, we conducted a questionnaire-based, cross-sectional survey on a sample of shiftworking nurses. Responses were obtained from 1202 nurses working at university hospitals in Tokyo, Japan, including 727 two-shift workers and 315 three-shift workers. The questionnaire included items relevant to age, gender, family structure, work environment, health-related quality of life (QOL), diurnal type, depressive symptoms, and SWD. Participants who reported insomnia and/or excessive sleepiness for at least 1 mo that was subjectively relevant to their shiftwork schedules were categorized as having SWD. The prevalence of SWD in the sampled shiftworking nurses was 24.4%; shiftworking nurses with SWD showed lower health-related QOL and more severe depressive symptoms, with greater rates of both actual accidents/errors and near misses, than those without SWD. The results of logistic regression analyses showed that more time spent working at night, frequent missing of nap opportunities during night work, and having an eveningness-oriented chronotype were significantly associated with SWD. The present study indicated that SWD might be associated with reduced health-related QOL and decreased work performance in shiftworking nurses on rapid-rotation schedules. The results also suggested that missing napping opportunities during night work, long nighttime working hours, and the delay of circadian rhythms are associated with the occurrence of SWD among shiftworking nurses on rapid-rotation schedules.

  3. Management of Teacher Scientific-Methodical Work in Vocational Educational Institutions on the Basis of Project-Target Approach

    Science.gov (United States)

    Shakuto, Elena A.; Dorozhkin, Evgenij M.; Kozlova, Anastasia A.

    2016-01-01

    The relevance of the subject under analysis is determined by the lack of theoretical development of the problem of management of teacher scientific-methodical work in vocational educational institutions based upon innovative approaches in the framework of project paradigm. The purpose of the article is to develop and test a science-based…

  4. A Collaborative Approach to Defining the Usefulness of Impact: Lessons from a Knowledge Exchange Project Involving Academics and Social Work Practitioners

    Science.gov (United States)

    Wilkinson, Heather; Gallagher, Michael; Smith, Mark

    2012-01-01

    This paper reports on a knowledge exchange project involving academics and practitioners in six local authority social work departments. It contributes to recent debates about the coproduction of knowledge, presenting findings in three key areas: the importance of relationships for knowledge exchange; "what works" for practitioners…

  5. Identification of promising Twin Hub networks : Report of Work Package 1 of the Intermodal rail freight Twin hub Network Northwest Europe - project (final report)

    NARCIS (Netherlands)

    Kreutzberger, E.D.; Konings, J.W.; Meijer, S.; Witteveen, C.; Meijers, B.M.; Pekin, E.; Macharis, C.; Kiel, J.; Kawabata, Y.; Vos, W.

    2014-01-01

    This report is the first deliverable of the project Intermodal Rail Freight Twin Hub Network Northwest Europe. We call its subject Twin hub network and the organisational entity to carry out the actions the Twin hub project. The project is funded by INTERREG NWE (programme IVb). Its work started in

  6. [Implementing population-based integrated care for a region: a work-in-progress report on the project "Gesundes Kinzigtal"].

    Science.gov (United States)

    Hildebrandt, Helmut; Schmitt, Gwendolyn; Roth, Monika; Stunder, Brigitte

    2011-01-01

    The regional integrated care model "Gesundes Kinzigtal" pursues the idea of integrated health care with special focus on increasing the health gain of the served population. Physicians (general practitioners) and psychotherapists, physiotherapists, hospitals, nursing services, non-profit associations, fitness centers, and health insurance companies work closely together with a regional management company and its programs on prevention and care coordination and enhancement. The 10 year-project is run by a company that was founded by the physician network "MQNK" and "OptiMedis AG", a corporation with public health background specialising in integrated health care. The aim of this project is to enhance prevention and quality of health care for a whole region in a sustainable way, and to decrease costs of care. The article describes the special funding model of the project, the engagement of patients, and the different health and prevention programmes. The programmes and projects are developed, implemented, and evaluated by multidisciplinary teams. Copyright © 2011. Published by Elsevier GmbH.

  7. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  8. Enhancing interdisciplinary climate change work through comprehensive evaluation

    Directory of Open Access Journals (Sweden)

    Jenna Klink

    2017-01-01

    Full Text Available This paper shares the details of an evaluation plan from an interdisciplinary climate change project that developed decision support tools (DSTs for agricultural advisors and farmers. It showcases how evaluation enhanced the project work by providing opportunities for the team to reflect on and use data to improve performance. The plan included both formative and summative approaches, team member interviews to assess team functioning, usability testing of DSTs, outreach and marketing campaign evaluation. Outreach evaluation included surveying those reached, monitoring project website traffic, and tracking and mapping outreach details. Marketing evaluation included pre-testing campaign materials, assessing open and click rates of email campaign, and monitoring associated traffic to website. The Useful to Usable (U2U team was generally high functioning, but team interviews allowed the evaluators and leaders to discern factors that were influencing intended outcomes, respond to needs, assign resources, and catalyze activities that were crucial in shaping the outcomes. Usability testing surfaced issues related to default values and search and help features that were addressed by the team and resulted in improved usability. Outreach evaluation found geographic and methodological gaps that were filled, resulting in more target audiences reached and more effective methods used (e.g., hands-on events. Marketing evaluation allowed for improving contact lists over time and improving campaign messaging before deployment. Evaluators and project leaders working on similar projects may adapt or utilize methods detailed in this paper, along with the recommendations, while designing and implementing improvement-oriented evaluation plans.

  9. Project SEED. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2012

    2012-01-01

    "Project SEED" is a supplemental mathematics program for low-achieving students in grades 3 through 8 and is intended to prepare students to be successful in high school and college math. Based on the Socratic method, instruction is delivered through a series of questions to the class. In addition to individual responses, the instructor…

  10. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  11. Delivery improvements for CANDU projects

    International Nuclear Information System (INIS)

    Stephen Yu; Ken Hedges

    1998-01-01

    Future CANDU design will continue to meet emerging design and performance requirements as expected by the operating utilities, and will integrate new technologies into both the product features and work processes. Elements of this risk reduction strategy include feedback of lessons learned from operating plants, project experiences from previous projects, and replication of successful systems and equipment. Project implementation risk is minimized by up-front engineering and licensing prior to contract start. Enhanced competitiveness of the CANDU products is ensured by incorporating improvements based on updated technology. This paper summarizes the strategy used to enhance competitiveness of the CANDU products and the measures introduced to minimize risk during project implementation. This strategy provides a balance between innovation and proven designs; and between the desire for safety and operational improvements and the cost to achieve the improvements

  12. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  13. The safe home project.

    Science.gov (United States)

    Arphorn, Sara; Jiraniratisai, Sopaphan; Rungtakul, Rungsri; Phutta, Nikom

    2011-12-01

    The Thai Health Promotion Foundation supported the Improvement of Quality of Life of Informal Workers project in Ban Luang District, Amphur Photaram, Ratchaburi Province. There were many informal workers in Ban Luang District. Sweet-crispy fish producers in Ban Luang were the largest group among the sweet-crispy fish producers in Thailand. This project was aimed at improving living and working conditions of informal workers, with a focus on the sweet-crispy fish group. Good practices of improved living and working conditions were used to help informal workers build safe, healthy and productive work environments. These informal workers often worked in substandard conditions and were exposed to various hazards in the working area. These hazards included risk of exposure to hot work environment, ergonomics-related injuries, chemical hazards, electrical hazards etc. Ergonomics problems were commonly in the sweet-crispy fish group. Unnatural postures such as prolonged sitting were performed dominantly. One hundred and fifty informal workers participated in this project. Occupational health volunteers were selected to encourage occupational health and safety in four groups of informal workers in 2009. The occupational health volunteers trained in 2008 were farmers, beauty salon workers and doll makers. The occupational health and safety knowledge is extended to a new informal worker group: sweet-crispy fish producer, in 2009. The occupational health and safety training for sweet-crispy fish group is conducted by occupational health volunteers. The occupational health volunteers increased their skills and knowledge assist in to make safe home and safe community through participatory oriented training. The improvement of living and working condition is conducted by using a modified WISH, Work Improvement for Safe Home, checklist. The plans of improvement were recorded. The informal workers showed improvement mostly on material handling and storage. The safe uses and safe

  14. Learning and Optimization of Cognitive Capabilities. Final Project Report.

    Science.gov (United States)

    Lumsdaine, A.A.; And Others

    The work of a three-year series of experimental studies of human cognition is summarized in this report. Proglem solving and learning in man-machine interaction was investigated, as well as relevant variables and processes. The work included four separate projects: (1) computer-aided problem solving, (2) computer-aided instruction techniques, (3)…

  15. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  16. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    Science.gov (United States)

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  17. [Manufacture of upholstered furniture and work-related upper limb musculoskeletal disorders: an industrial sector prevention project].

    Science.gov (United States)

    Di Leone, G; Carino, M; Nicoletti, S; Trani, G; Ambrosi, L

    2008-01-01

    In cooperation with the IRCCS Fondazione Maugeri and the IRCCS Fondazione Ospedale Maggiore Policlinico - EPM-CEMOC, of Milan, the Local Health Unit in Bari, Italy carried out a research project, sponsored partly by the Italian Ministry of Health, on upper limb work-related musculoskeletal disorders (UL-WMSDs) in a specific manufacturing sector, the upholstered furniture industry. This "sofa district" is widely represented with approximately 14,000 workers and 500 factories over a wide geographic area of southern Italy. Advanced technology in the manufacturing process is combined with workers performing intensive arm-hand tasks. The aim of the study included: a) assessment of exposure to repetitive strain and movements of the upper limb in a representative sample of the factories using the OCRA method, b) analysis of the annual prevalence and incidence rates, c) definition of possible improvement via ergonomic solutions in the various factories. Via a network of occupational physicians a total of more than 6000 subjects were examined over a 5-year period. Case-definition was assessed through standardized procedures. A detailed description of the manufacturing process of the upholstered furniture industry and of the characteristics of the working population is provided Exposed groups at risk were:filling preparation workers, leather-cutting operators, sewing and upholstery-assembly workers. Data collected in private companies of different size in this extensive industrial "sofa area" emphasize the importance of prevention through adequate ergonomic solutions and the need to improve training programmes covering the whole area.

  18. Canons and Heroes: The Reception of the Complete Works Translation Project in Finland, 2002-13

    Directory of Open Access Journals (Sweden)

    Keinänen Nely

    2017-12-01

    Full Text Available This essay examines the reception of the ten-year Complete Works translation project undertaken by the Finnish publishing company Werner Söderström Oy (WSOY in 2004-13. Focusing on reviews published in the first and last years of the project, the essay details ongoing processes of Shakespeare (re-canonization in Finland, as each new generation explains to itself what Shakespeare means to them, and why it continues to read, translate and perform Shakespeare. These processes are visible in comments from the series editors and translators extolling the importance of Shakespeare’s work and the necessity of creating new, modern translations so Finns can read Shakespeare in their mother tongue; in discussions of the literary qualities of a good Shakespeare translation, e.g. whether it is advisable to use iambic pentameter in Finnish, a trochaic language; and in the creation of publisher and translator “heroes,” who at significant cost to themselves, whether in money in terms of the publisher, or time and effort in terms of the translators, labour to provide the public with their Shakespeare in modern Finnish. While on the whole reviewers celebrated the new translations, there was some resistance to changes in familiar lines from older translations, such as Macbeth’s “tomorrow” speech, suggesting that there are nevertheless some limits on modernizing “classic” translations.

  19. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  20. Report on all ARRA Funded Technical Work

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. This project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.

  1. A meta-analysis including dose-response relationship between night shift work and the risk of colorectal cancer.

    Science.gov (United States)

    Wang, Xiao; Ji, Alin; Zhu, Yi; Liang, Zhen; Wu, Jian; Li, Shiqi; Meng, Shuai; Zheng, Xiangyi; Xie, Liping

    2015-09-22

    A meta-analysis was conducted to quantitatively evaluate the correlation between night shift work and the risk of colorectal cancer. We searched for publications up to March 2015 using PubMed, Web of Science, Cochrane Library, EMBASE and the Chinese National Knowledge Infrastructure databases, and the references of the retrieved articles and relevant reviews were also checked. OR and 95% CI were used to assess the degree of the correlation between night shift work and risk of colorectal cancer via fixed- or random-effect models. A dose-response meta-analysis was performed as well. The pooled OR estimates of the included studies illustrated that night shift work was correlated with an increased risk of colorectal cancer (OR = 1.318, 95% CI 1.121-1.551). No evidence of publication bias was detected. In the dose-response analysis, the rate of colorectal cancer increased by 11% for every 5 years increased in night shift work (OR = 1.11, 95% CI 1.03-1.20). In conclusion, this meta-analysis indicated that night shift work was associated with an increased risk of colorectal cancer. Further researches should be conducted to confirm our findings and clarify the potential biological mechanisms.

  2. 18 CFR 367.1070 - Account 107, Construction work in progress.

    Science.gov (United States)

    2010-04-01

    ... NATURAL GAS ACT Balance Sheet Chart of Accounts § 367.1070 Account 107, Construction work in progress. (a) This account must include the total of the balances of construction projects for service company..., Construction work in progress. 367.1070 Section 367.1070 Conservation of Power and Water Resources FEDERAL...

  3. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  4. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  5. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  6. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  7. Economics, funding and the influence of politics on the UMTRA Project

    International Nuclear Information System (INIS)

    Hamp, S.

    1993-01-01

    This presentation discusses the factors contributing to the cost of the Uranium Mill Tailings Remediation Action Project and the political process involved in the funding. Topics covered include the following: Funding estimate and growth of estimate; Management actions during process; how the political process worked; cost of completed sites; economic benefit analysis of the project to Colorado; cost reduction program for the UMTRA project

  8. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  9. MORE - Management of requirements in NPP modernisation projects. Project report 2006

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Thunem, H.P.J. [IFE (Norway); Valkonen, J. [VTT (Finland)

    2007-02-15

    The purpose of the report is to document the work and related activities in the period January 1 December 31 in 2006, including dissemination activities. The work in this period has been concentrated on further research for adopting an approach for dependable requirements engineering and its supporting tool. The majority of the efforts in 2006, however, was spent on making the researchers, developers, utilities and licensees more aware of the importance of the area of requirements engineering, and in that respect organising an international seminar on dependable requirements engineering. This seminar was defined as a deliverable in the Activity Plan for 2006 and became also the most important deliverable for 2006. Therefore, this report naturally features a detailed summary of the seminar, which proved to be a true success and at the same time a door opener for more initiatives within the topic, proposed by several participants. More efforts within dissemination of the background and objectives of the project MORE within the nuclear community and towards NPPs that do carry out modernisation projects continued to be one important focus. (au)

  10. MORE - Management of requirements in NPP modernisation projects. Project report 2006

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Thunem, H.P.J.; Valkonen, J.

    2007-02-01

    The purpose of the report is to document the work and related activities in the period January 1 December 31 in 2006, including dissemination activities. The work in this period has been concentrated on further research for adopting an approach for dependable requirements engineering and its supporting tool. The majority of the efforts in 2006, however, was spent on making the researchers, developers, utilities and licensees more aware of the importance of the area of requirements engineering, and in that respect organising an international seminar on dependable requirements engineering. This seminar was defined as a deliverable in the Activity Plan for 2006 and became also the most important deliverable for 2006. Therefore, this report naturally features a detailed summary of the seminar, which proved to be a true success and at the same time a door opener for more initiatives within the topic, proposed by several participants. More efforts within dissemination of the background and objectives of the project MORE within the nuclear community and towards NPPs that do carry out modernisation projects continued to be one important focus. (au)

  11. The supervisor in the project-organized group work should participate in developing the students' project competencies

    DEFF Research Database (Denmark)

    Hansen, Søren

    2004-01-01

    The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects.......The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects....

  12. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  13. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  14. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  15. Quality of Work and Team- and Project Based Work Practices in Engineering

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    It is the aim of this paper to investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals and eventually their quality of work. The paper investigates how professional engineering...... ractices are enacted in two engineering consultancy companies in Denmark where ‘teamwork’ has been or is an ideal for organizing work....

  16. Safety at Work : Research Methodology

    NARCIS (Netherlands)

    Beurden, van K. (Karin); Boer, de J. (Johannes); Brinks, G. (Ger); Goering-Zaburnenko, T. (Tatiana); Houten, van Y. (Ynze); Teeuw, W. (Wouter)

    2012-01-01

    In this document, we provide the methodological background for the Safety atWork project. This document combines several project deliverables as defined inthe overall project plan: validation techniques and methods (D5.1.1), performanceindicators for safety at work (D5.1.2), personal protection

  17. Project Management Web Tools at the MICE experiment

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    Project management tools like Trac are commonly used within the open-source community to coordinate projects. The Muon Ionization Cooling Experiment (MICE) uses the project management web application Redmine to host mice.rl.ac.uk. Many groups within the experiment have a Redmine project: analysis, computing and software (including offline, online, controls and monitoring, and database subgroups), executive board, and operations. All of these groups use the website to communicate, track effort, develop schedules, and maintain documentation. The issue tracker is a rich tool that is used to identify tasks and monitor progress within groups on timescales ranging from immediate and unexpected problems to milestones that cover the life of the experiment. It allows the prioritization of tasks according to time-sensitivity, while providing a searchable record of work that has been done. This record of work can be used to measure both individual and overall group activity, identify areas lacking sufficient personne...

  18. ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project

    Science.gov (United States)

    Baresi, Larry

    1989-03-01

    The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.

  19. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  20. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  1. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included.

  2. Transition projects FY 1995 multi-year program/fiscal year work plan WBS 1.3.1. and 7.1

    International Nuclear Information System (INIS)

    1994-09-01

    The primary Transition Projects mission is to deactivate facilities on the Hanford site, in preparation for decontamination and decommissioning, and secondarily to provide safe and secure storage of special nuclear materials, nuclear materials, and nuclear fuel. Transition projects will protect the health and safety of the public and of workers, protect the environment, and provide beneficial use of the facilities and other resources. Goals include the following: Achieve deactivation of facilities for transfer to the Hanford Surplus Facility Program, suing PUREX plant deactivation as a model; Achieve excellence in the conduct of operations and maintenance of nuclear facilities in support of the Hanford Site Mission; manage nuclear materials in a safe and secure condition; treat nuclear materials as necessary and store onsite in long-term interim safe storage awaiting a final disposition decision. Description of the program and projects is included

  3. Managing the Right Projects: Best Practices to Align Project and Corporate Strategies

    Science.gov (United States)

    Watkins, Bobby

    2012-01-01

    If there's a human endeavor that exemplifies teamwork, it is space exploration. And that teamwork absolutely cannot happen effectively if the boots on the ground the people doing the work - don't understand how their work aligns with the larger goal. This presentation will discuss some best management practices from NASA's Marshall Space Flight Center that have succeeded in helping employees become informed, engaged and committed to the space agency's important missions. Specific topics include: Alignment Criteria: Linking Projects To Corporate Strategy. Resource Management: Best Practices For Resource Management. Strategic Analysis: Supporting Decision Making In A Changing Environment. Communication Strategies: Best Practices To Communicate Change. Benefits Achieved And Lessons Learned.

  4. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  5. Statements of work for FY 1996 to 2001 for the Hanford Low-Level Tank Waste Performance Assessment Project

    International Nuclear Information System (INIS)

    Mann, F.M.

    1995-01-01

    The statements of work for each activity and task of the Hanford Low-Level Tank Waste Performance Assessment project are given for the fiscal years 1996 through 2001. The end product of this program is approval of a final performance assessment by the Department of Energy in the year 2000

  6. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  7. The times they are a-changing: Self-directed long-term services and supports and gerontological social work.

    Science.gov (United States)

    Sciegaj, Mark; Hooyman, Nancy R; Mahoney, Kevin J; DeLuca, Casey

    2018-03-05

    The Partnerships for Person-Centered (PC) and Participant-Directed (PD) Long-Term Services and Supports (LTSS) Project (Partnerships Project) was a three-year effort funded by the New York Community Trust to develop and implement social work curriculum that would better prepare students for the changing practice demands of the aging and disability services network for self-directed LTSS (SD-LTSS). This article first describes the growth of SD-LTSS and the need for trained social workers on this service delivery model. The paper then describes the Partnerships Project that involved schools of social work along and aging and disability network organization partners in nine states. This description includes the major activities of the project including the creation of SD-LTSS competencies for social work education, the infusion of these competencies in beginning and advanced social work classes, and student assessment of their attainment of these competencies. This article then discusses the challenges to institutionalizing such curricular changes within social work programs and the need for a national strategy to train social workers for the demands of SD-LTSS.

  8. Including solar energy in the local heat supply of the Goettingen city works; Einbindung von Sonnenenergie in die Nahwaermeversorgung der Stadtwerke Goettingen AG

    Energy Technology Data Exchange (ETDEWEB)

    Tepe, R. [ISFH - Institut fuer Solarenergieforschung Hameln-Emmerthal GmbH, Emmerthal (Germany); Schreitmueller, K.R. [ISFH - Institut fuer Solarenergieforschung Hameln-Emmerthal GmbH, Emmerthal (Germany); Vanoli, K. [ISFH - Institut fuer Solarenergieforschung Hameln-Emmerthal GmbH, Emmerthal (Germany)

    1996-11-01

    The research project `Solar local heat Goettingen` was started in 1992 in which, by including a 785 m{sup 2} flat collector plant in the return of the local heat supply of the Goettingen City Works; the potential of the combined system of solar plant and conventional heat supply system is to be proved. The size of the collector plant and inclusion in an existing local heat network promised an advantageous combination due to appreciably lower investment costs (lower collector installation costs) and savings in system technique, reduced operating costs, and higher income due to favourable operating conditions with even low collector operating temperatures and reduced piping losses. In parallel with this system, the Goettingen City Works installed an air collector plant which is used to preheat the combustion air taken to the conventional burners. (orig./HW) [Deutsch] Es entstand im Jahr 1992 das Forschungsvorhaben `Solare Nahwaerme Goettingen`, in dem durch die Einbindung einer 785 m{sup 2} grossen Flachkollektoranlage in den Ruecklauf der Nahwaermeversorgung der Stadtwerke Goettingen AG das Potential der Systemkombination Solaranlage und konventionelle Waermeversorgungssystem nachgewiesen werden sollte. Die Groesse der Kollektoranlage sowie die Einbindung in ein bestehendes Nahwaermenetz versprachen eine vorteilhafte Kombination aufgrund - deutlich geringerer Investionskosten (geringe Kollektorinstallationskosten sowie Einsparungen bei der Systemtechnik); - reduzierter Betriebskosten; - hoher Ertraege durch guenstige Betriebsbedingungen wie gleichbleibend niedriger Kollektorbetriebstemperaturen und reduzierter Leitungsverluste. Parallel zu diesem System installierten die Stadtwerke Goettingen AG eine Luftkollektoranlage, die der Vorwaermung der den konventionellen Brennern zugefuehrten Verbrennungsluft dient. (orig./HW)

  9. Working in the informal economy.

    Science.gov (United States)

    Kidder, T

    2000-07-01

    Informal ways of working are widespread and central to the economy and markets. This paper explores what informal economy is and how it could be more valuable for men and women. The informal economy is a mix of the following activities: 1) subsistence work which includes agriculture, marginal economic projects, and unpaid work in the home; 2) informal work which includes unregistered businesses, and illegal or criminal activities; 3) casual production, a sub-contracted or ¿off-the-books¿ work which deprives workers of the benefits tied to recognized employment; and 4) community work and barter. It is shown that more women, when compared to men, work and live on the border between the household and the market economy. Usually men do more technical or mechanized production while women tend to do activities within traditional women's roles. Men and women often have different understanding of what work is. Men consistently underestimate the women's contribution to the household income. To improve this critical issue of gender differences, rules, norms, and laws that cause problems must be identified, and then work can begin with both men and women to change laws and policies, as well as ideas and beliefs about women's contribution to the economy.

  10. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    Energy Technology Data Exchange (ETDEWEB)

    Kupferman, S.L. (ed.)

    1987-05-01

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group has also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base.

  11. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    International Nuclear Information System (INIS)

    Kupferman, S.L.

    1987-05-01

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group has also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base

  12. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  13. Report of investigation into allegations of retaliation for raising safety and quality of work issues regarding Argonne National Laboratory's Integral Fast Reactor project

    International Nuclear Information System (INIS)

    1991-12-01

    In August 1990 James A. Smith resigned his position as an experimenter at Argonne National Laboratory-West (ANL-W), located near Idaho Falls, Idaho. Smith who holds a Ph.D. in metallurgy, had worked at the Laboratory since 1988, primarily on its Integral Fast Reactor (IFR) project. He alleged that the quality of the Laboratory's work on that project had been undermined by fundamental errors in metallurgy and related sciences, at least some of which had nuclear safety implications; that the Laboratory had published false and misleading accounts of its work; that prevailing attitudes at the Laboratory were antithetical to quality scientific work; and that because he had expressed concerns about these matters his job was threatened by his managers. Evidence gathered during an investigation by the Department of Energy's Office of Nuclear Safety (NS) is presented and conclusions and recommendations are provided

  14. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria.

  15. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria. 

  16. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  17. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  18. Summer Student Project: Collecting and disseminating CDS KPIs

    CERN Document Server

    Alvarez Perez, Carmen

    2010-01-01

    CDS (CERN Document Server) stores over 900,000 bibliographic records, including 360,000 fulltext documents, of interest to people working in particle physics and related areas. My project consisted on extracting KPIs (Key Performance Indicators) from it and feeding them to a central IT KPI system. To achieve this, I learned the CDS-Invenio open source digital library software, and worked with its statistic module.

  19. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  20. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  1. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    International Nuclear Information System (INIS)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A.; Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A.; Turland, B.D.; Dobson, G.P.; Siccama, A.; Ikonen, K.; Parozzi, F.; Kolev, N.; Caira, M.

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues

  2. Ceramic Technology Project. Semiannual progress report for April 1993 through September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Ceramic Technology Project was originally developed by the Department of Energy`s Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS`s Materials Development Program, was developed to meet the ceramic technology requirements of the OTS`s automotive technology programs. During the course of the Ceramic Technology Project, remarkable progress has been made in the development of reliable structural ceramics. However, further work is needed to reduce the cost of ceramics to facilitate their commercial introduction, especially in the highly cost-sensitive automotive market. The work described in this report is organized according to the following WBS project elements: Project Management and Coordination; Materials and Processing; Materials Design Methodology; Data Base and Life Prediction; and Technology Transfer. This report includes contributions from all currently active project participants. Separate abstracts were prepared for the 47 projects reported here.

  3. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  4. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    are varying depending on the working time possessions presented through the closure of the railway line. The effective working hours, type of construction work and construction speed are used as constraints to ensure the track closure plan remains feasible. To demonstrate the approach a Danish railway...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  5. Early awareness of emerging risks associated with food and feed production: Synopsis of pertinent work carried out within the SAFE FOODS project

    NARCIS (Netherlands)

    Marvin, H.J.P.; Kleter, G.A.

    2009-01-01

    This introduction to the journal¿s supplement on emerging food and feed safety issues summarizes the objectives and activities of the EU-funded SAFE FOODS project in general and its work package focusing on the early identification of emerging food safety risks, in particular. Within this work

  6. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  7. Nuclear safety project

    International Nuclear Information System (INIS)

    1984-11-01

    The semiannual progress report 1984/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1984 in the nuclear safety field by KfK institutes and departements and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./RW) [de

  8. Project Nuclear Safety

    International Nuclear Information System (INIS)

    1981-11-01

    The semiannual progress report 1981/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1981 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics, work performed, results obtained, plans for future work. This report was compiled by the project management. (orig.) [de

  9. CEC project Mirage - second phase on migration of radionuclides in the geosphere. Third (and final) summary progress report (work period 1989)

    International Nuclear Information System (INIS)

    Come, B.

    1990-01-01

    A second phase of the Community coordinated project Mirage (migration of radionuclides in the geosphere) was launched in 1986. The present report brings together reviews of work done in the four research areas of this phase for 1989, and therefore constitutes an update of the previous reports, ref. EUR 11589 and 12229. This project is part of the CEC R and D programme on radioactive waste management (1985-89)

  10. A systematic review including meta-analysis of work environment and burnout symptoms.

    Science.gov (United States)

    Aronsson, Gunnar; Theorell, Töres; Grape, Tom; Hammarström, Anne; Hogstedt, Christer; Marteinsdottir, Ina; Skoog, Ingmar; Träskman-Bendz, Lil; Hall, Charlotte

    2017-03-16

    Practitioners and decision makers in the medical and insurance systems need knowledge on the relationship between work exposures and burnout. Many burnout studies - original as well as reviews - restricted their analyses to emotional exhaustion or did not report results on cynicism, personal accomplishment or global burnout. To meet this need we carried out this review and meta-analyses with the aim to provide systematically graded evidence for associations between working conditions and near-future development of burnout symptoms. A wide range of work exposure factors was screened. Inclusion criteria were: 1) Study performed in Europe, North America, Australia and New Zealand 1990-2013. 2) Prospective or comparable case control design. 3) Assessments of exposure (work) and outcome at baseline and at least once again during follow up 1-5 years later. Twenty-five articles met the predefined relevance and quality criteria. The GRADE-system with its 4-grade evidence scale was used. Most of the 25 studies focused emotional exhaustion, fewer cynicism and still fewer personal accomplishment. Moderately strong evidence (grade 3) was concluded for the association between job control and reduced emotional exhaustion and between low workplace support and increased emotional exhaustion. Limited evidence (grade 2) was found for the associations between workplace justice, demands, high work load, low reward, low supervisor support, low co-worker support, job insecurity and change in emotional exhaustion. Cynicism was associated with most of these work factors. Reduced personal accomplishment was only associated with low reward. There were few prospective studies with sufficient quality on adverse chemical, biological and physical factors and burnout. While high levels of job support and workplace justice were protective for emotional exhaustion, high demands, low job control, high work load, low reward and job insecurity increased the risk for developing exhaustion. Our

  11. A systematic review including meta-analysis of work environment and burnout symptoms

    Directory of Open Access Journals (Sweden)

    Gunnar Aronsson

    2017-03-01

    Full Text Available Abstract Background Practitioners and decision makers in the medical and insurance systems need knowledge on the relationship between work exposures and burnout. Many burnout studies – original as well as reviews - restricted their analyses to emotional exhaustion or did not report results on cynicism, personal accomplishment or global burnout. To meet this need we carried out this review and meta-analyses with the aim to provide systematically graded evidence for associations between working conditions and near-future development of burnout symptoms. Methods A wide range of work exposure factors was screened. Inclusion criteria were: 1 Study performed in Europe, North America, Australia and New Zealand 1990–2013. 2 Prospective or comparable case control design. 3 Assessments of exposure (work and outcome at baseline and at least once again during follow up 1–5 years later. Twenty-five articles met the predefined relevance and quality criteria. The GRADE-system with its 4-grade evidence scale was used. Results Most of the 25 studies focused emotional exhaustion, fewer cynicism and still fewer personal accomplishment. Moderately strong evidence (grade 3 was concluded for the association between job control and reduced emotional exhaustion and between low workplace support and increased emotional exhaustion. Limited evidence (grade 2 was found for the associations between workplace justice, demands, high work load, low reward, low supervisor support, low co-worker support, job insecurity and change in emotional exhaustion. Cynicism was associated with most of these work factors. Reduced personal accomplishment was only associated with low reward. There were few prospective studies with sufficient quality on adverse chemical, biological and physical factors and burnout. Conclusion While high levels of job support and workplace justice were protective for emotional exhaustion, high demands, low job control, high work load, low reward and job

  12. Organizational Enablers for Project Governance

    DEFF Research Database (Denmark)

    Müller, Ralf; Shao, Jingting; Pemsel, Sofia

    and their relationships to organizational success. Based on these results, the authors discovered that organizational enablers (including key factors such as leadership, governance, and influence of project managers) have a critical impact on how organizations operate, adapt to market fluctuations and forces, and make......While corporate culture plays a significant role in the success of any corporation, governance and “governmentality” not only determine how business should be conducted, but also define the policies and procedures organizations follow to achieve business functions and goals. In their book......, Organizational Enablers for Project Governance, Ralf Müller, Jingting Shao, and Sofia Pemsel examine the interaction of governance and governmentality in various types of companies and demonstrate how these factors drive business success and influence project work, efficiency, and profitability. The data...

  13. A work bibliography on native food consumption, demography and lifestyle. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Murray, C.E.; Lee, W.J.

    1992-12-01

    The purpose of this report is to provide a bibliography for the Native American tribe participants in the Hanford Environmental Dose Reconstruction (HEDR) Project to use. The HEDR Project`s primary objective is to estimate the radiation dose that individuals could have received as a result of emissions since 1944 from the US Department of Energy`s Hanford Site near Richland, Washington. Eight Native American tribes are responsible for estimating daily and seasonal consumption of traditional foods, demography, and other lifestyle factors that could have affected the radiation dose received by tribal members. This report provides a bibliography of recorded accounts that tribal researchers may use to verify their estimates. The bibliographic citations include references to information on the specific tribes, Columbia River plateau ethnobotany, infant feeding practices and milk consumption, nutritional studies and radiation, tribal economic and demographic characteristics (1940--1970), research methods, primary sources from the National Archives, regional archives, libraries, and museums.

  14. What drives continuous improvement project success in healthcare?

    Science.gov (United States)

    Stelson, Paul; Hille, Joshua; Eseonu, Chinweike; Doolen, Toni

    2017-02-13

    Purpose The purpose of this paper is to present findings from a study of factors that affect continuous improvement (CI) project success in hospitals. Design/methodology/approach Quantitative regression analysis was performed on Likert scale survey responses. Qualitative thematic analysis was performed on open-ended survey responses and written reports on CI projects. Findings The paper identifies managerial and employee factors that affect project success. These factors include managerial support, communication, and affective commitment. Affective commitment is the extent to which employees perceive the change as being needed or necessary. Practical implications The results highlight how managerial decisions, approaches to communication - including communication before, during and after CI projects affect project success. The results also show that success depends on the way employees perceive proposed changes. This suggests the need for a more individualized approach to CI, lean, and broader change initiatives. Originality/value This research is the first to fuse project success and sustainability theory to CI projects, beyond Kaizen events, in healthcare environments. The research is particularly important at a time when healthcare organizations are required to make rapid changes with limited resources as they work toward outcome-based assessment and reimbursement rules.

  15. Report about drilling works made in 13 Anomaly de Taylor and in the N- NE of its, around Fraile Muerto (Cerro Largo district): Uranium project

    International Nuclear Information System (INIS)

    Massa, J; Pirelli, H.

    1983-01-01

    The perforations were carried out to investigate in depth denominated anomaly 13 detected during the Taylor Mission (1975) and extended the punch area of study during you are suitable DINAMIGE-BRGM (Project the present report details the activities realised in the environs Fraile Muerto (Cerro Largo district) by the command team of perforations of the uranium project. Previously and contemporarily to the executed works, prospection became geophysical ground geochemistry geology and, works. (Uranium)

  16. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  17. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    Energy Technology Data Exchange (ETDEWEB)

    Wade, F. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-04-21

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for the chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.

  18. Earth Systems Field Work: Service Learning at Local and Global Scales

    Science.gov (United States)

    Moore, A.; Derry, L. A.

    2016-12-01

    The Earth & Environmental Systems (EES) Field Program engages students in hands-on exploration along the boundaries of the living earth, solid earth, ocean, and atmosphere. Based on Hawaíi Island, the semester-length program integrates scientific study with environmental stewardship and service learning. Each year EES students contribute 3000 hours of service to their host community. Throughout the semester students engage in different service activities. Most courses includes a service component - for example - study of the role of invasive species in native ecosystems includes an invasive species removal project. Each student completes a 4-week service internship with a local school, NGO, state or federal agency. Finally, the student group works to offset the carbon footprint of the program in collaboration with local conservation projects. This effort sequesters CO2 emissions while at the same time contributing to reforestation of degraded native ecosystems. Students learn that expertise is not confined to "the academy," and that wisdom and inspiration can be found in unexpected venues. Much of the service learning in the EES Program occurs in collaboration with local partners. Service internships require students to identify a partner and to design a tractable project. Students work daily with their sponsor and make a formal presentation of their project at the end of the internship period. This includes speaking to a non-technical community gathering as well as to a scientific audience. For many students the opportunity to work on a real problem, of interest in the real world, is a highlight of the semester. Beyond working in support of local community groups, the EES Prograḿs C-neutral project engages students with work in service to the global commons. Here the outcome is not measurable within the time frame of a semester, yet the intangible result makes the experience even more powerful. Students take responsibility for an important issue that is not

  19. Hanford Works monthly report, February 1953

    Energy Technology Data Exchange (ETDEWEB)

    1953-03-18

    This document presents a summary of work and progress at the Hanford Engineer Works for February 1953. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Service departments have sections presenting their monthly statistics, work, progress, and summaries.

  20. Hanford Works monthly report, October 1952

    Energy Technology Data Exchange (ETDEWEB)

    1952-11-20

    this document presents a summary of work and progress at the Hanford Engineer works for October 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  1. Hanford Works monthly report, October 1951

    Energy Technology Data Exchange (ETDEWEB)

    1951-11-21

    This document presents a summary of work and progress at the Hanford Engineer Works for October 1951. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  2. Hanford Works monthly report, August 1952

    Energy Technology Data Exchange (ETDEWEB)

    1952-09-24

    This document presents a summary of work and progress at the Hanford Engineer Works for August 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department` section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical,Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  3. Hanford Works monthly report, September 1952

    Energy Technology Data Exchange (ETDEWEB)

    1952-10-20

    This document presents a summary of work and progress at the Hanford Engineer Works for September 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  4. Hanford Works monthly report, December 1952

    Energy Technology Data Exchange (ETDEWEB)

    1953-01-23

    This document presents a summary of work and progress at the Hanford Engineer Works for December 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  5. Preservation of Records, Knowledge and Memory Across Generations. An emerging Multidisciplinary Work Area and an NEA Project - 12218

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, Jantine [Belgian Nuclear Research Institute SCK.CEN, Mol (Belgium); Pescatore, Claudio [OECD NEA, Paris (France)

    2012-07-01

    Disposal in engineered facilities built in stable, deep geological formations is the reference means for permanently isolating long-lived radioactive waste from the human biosphere. This management method is designed to be intrinsically safe and final, i.e. not dependent on human presence and intervention in order to fulfil its safety goal. There is however no intention to forgo, at any time, knowledge and awareness either of the repository or of the waste that it contains. The preservation of Records, Knowledge and Memory (RK and M) is seen as an integral part of radioactive waste management, supporting lengthy and complex socio-technical processes across pre-operational, operational and post-operational lifetimes. Long-term preservation of RK and M is an emerging multidisciplinary work area in which much learning is expected over the coming years. Novel methods are being sought that are least vulnerable to both natural degradation and to changes in socio-economic conditions. Progress has been made in individual countries, but there is a need to internationalise the thinking, compare approaches, investigate potential solutions and share decisions. This is the task of the NEA RK and M project. A major outcome of the project will be a 'menu-driven document' that will allow people to identify the main elements of a strategic action plan for RK and M preservation. In sum, the preservation of RK and M is a unprecedented task in which technical, scientific and social information is interwoven and needs to be developed and preserved across generations and across specialist boundaries. Important studies have been undertaken in the past decades to explore a variety of approaches to preserving RK and M across different timescales, including archives and markers. The work of the past in this area is useful, but innovative thinking is also needed. Seen from today's perspective, very little work is available on for example the contextualization of data for later

  6. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  7. Separations innovative concepts: Project summary

    Energy Technology Data Exchange (ETDEWEB)

    Lee, V.E. (ed.)

    1988-05-01

    This project summary includes the results of 10 innovations that were funded under the US Department's Innovative Concept Programs. The concepts address innovations that can substantially reduce the energy used in industrial separations. Each paper describes the proposed concept, and discusses the concept's potential energy savings, market applications, technical feasibility, prior work and state of the art, and future development needs.

  8. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  9. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  10. In situ stresses in rock masses: methodology for its study in tunnel projects in Spain

    International Nuclear Information System (INIS)

    Madirolas Perez, G.; Perucho Martinez, A.

    2014-01-01

    In situ stress is one of the main factors to be taken into account in the design of tunnels, as it can cause inadmissible stresses and strains leading to high deviations in the budgets. For that reason, the stress state is directly introduced into the numerical models used for the design of tunnels. In Spain, although several tunnels have been carried out with an important overburden in tectonically relevant zones, a quantitative determination of the stresses has not been usually included in civil work projects. Therefore, it is considered necessary to implement a routine procedure of study of civil work projects involving tunnels excavated in rock, and a new detailed methodology is proposed. The challenge is that project managers, who face works in which stresses may play a determinant role, may have a practical reference enabling them to optimize available resources and to include the real stress information in the design of underground works. (Author)

  11. Causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait

    OpenAIRE

    Naser S. Almutairi

    2016-01-01

    This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative impor...

  12. Internal evaluation of the European network for health technology assessment project.

    Science.gov (United States)

    Håheim, Lise Lund; Imaz, Iñaki; Loud, Marlène Läubli; Gasparetto, Teresa; González-Enriquez, Jesús; Dahlgren, Helena; Trofimovs, Igor; Berti, Elena; Mørland, Berit

    2009-12-01

    The internal evaluation studied the development of the European network for Health Technology Assessment (EUnetHTA) Project in achieving the general objective of establishing an effective and a sustainable network of health technology assessment (HTA) in Europe. The Work Package 3 group was dedicated to this task and performed the work. Information on activities during the project was collected from three sources. First, three yearly cross-sectional studies surveyed the participants' opinions. Responses were by individuals or by institutions. The last round included surveys to the Steering Committee, the Stakeholder Forum, and the Secretariat. Second, the Work Package Lead Partners were interviewed bi-annually, five times in total, to update the information on the Project's progress. Third, additional information was sought in available documents. The organizational structure remained stable. The Project succeeded in developing tools aimed at providing common methodology with intent to establish a standard of conducting and reporting HTA and to facilitate greater collaboration among agencies. The participants/agencies expressed their belief in a network and in maintaining local/national autonomy. The Work Package Leaders expressed a strong belief in the solid base of the Project for a future network on which to build, but were aware of the need for funding and governmental support. Participants and Work Package Leaders have expressed support for a future network that will improve national and international collaboration in HTA based on the experience from the EUnetHTA project.

  13. DO INTERVENTION STRATEGIES OF WOMEN HEALTHY HEART PROJECT (WHHP IMPACT ON DIFFERENTLY ON WORKING AND HOUSEWIVES?

    Directory of Open Access Journals (Sweden)

    Masoumeh Sadeghi

    2011-03-01

    Full Text Available BACKGROUND: The purpose of this study is to evaluate the possible difference of the impact of Women Healthy Heart Project on lifestyle, as well as physical/biochemical parameters of working women and housewives.    METHODS: This was a community-based intervention study conducted over 5 years (2002-2007 in the counties of Isfahan and Najafabad (intervention areas and Arak (control. Pre-study situation analysis of women was followed by 5 years of wide-ranging interventions (educational/environmental conducted by various organizations using different methodologies. The interventions were aimed at modifying/improving lifestyle by increasing physical activity, encouraging healthy eating, and tobacco use cessation. The organizations involved in performing the interventions included the local radio and television authority, health/treatment centers, the Red Crescent Society, Municipalities, the Relief Committee, the Center for Retirees’ Welfare, and the Literacy Campaign Organization. After 5 years, final phase same as first phase was planed. The subjects studied in all phases` the pre- and post-intervention phases consisted of 10586 women aged above 18 years. Demographic data, obesity index, smoking, physical activity and eating habit were assessed before and after the study. Data were analyzed using SPSS-15 using Student’s t-test, chi-square test, the general linear model of ANOVA, and logistic regression.    RESULTS: We studied 10586 women (6105 and 4481 women, pre- and post-intervention, respectively. Mean age of working women was 34.14 ± 10.09 and 34.08 ± 9.35 years before and after the study, respectively. Mean age of housewives before and after the study was 40.05 ± 14.61 and 40.36 ± 15.32 years, respectively. Interventions conducted during 5 years improved eating habits and decreased tobacco use in working women and housewives. In every phase of the study, there was a significant age difference between housewives and working women

  14. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  15. 1986 progress report on R and D work of the Nuclear Fusion Project (PKF)

    International Nuclear Information System (INIS)

    Kast, G.

    1987-03-01

    The Kernforschungszentrum Karlsruhe (KfK) and the Max-Planck-Institute for Plasma Physics, Garching, have joined to form the Entwicklungsgemeinschaft Kernfusion, and under this roof perform research work on the physical and technical conditions and requirements of using the energy from nuclear fusion, and to plan the design and the construction of the necessary equipment for future large-scale experiments. The activities of the KfK for the development of fusion devices with magnetic confinement have been concentrated in the Nuclear Fusion Project, which cooperates in the European Fusion Technology Programme, on the basis of an association agreement between KfK and Euratom, supported by the European Commission. Supplementary KfK contributions, studies in most cases, create a connection between various fields of work, and prepare the road for new tasks, which in the years to come will be found in the extension of the Fusion Technology Programme and the planning work for NET. The reports collected in this annual survey are contributions from KfK Institutes of the year 1986. An annex presents the Easks taken over by KfK within the Fusion Technology Programme of the EC, and notes on the KfK Institutes taking part in the particular activities facilitate reference to the individual, full-text reports. (orig.) [de

  16. Project Physics Tests 4, Light and Electromagnetism.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 4 are presented in this booklet. Included are 70 multiple-choice and 22 problem-and-essay questions. Concepts of light and electromagnetism are examined on charges, reflection, electrostatic forces, electric potential, speed of light, electromagnetic waves and radiations, Oersted's and Faraday's work,…

  17. Annual report of the Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusin Working Group (FWG))

    International Nuclear Information System (INIS)

    1987-04-01

    The Summit Members' Working Group on Controlled Thermonuclear Fusion [Fusion Working Group (FWG)] was established in 1983 in response to the Declaration of the Heads of State and Government at the Versailles Economic Summit meeting of 1982, and in response to the subsequent report of the Working Group in Technology, Growth and Employment (TGE) as endorsed at the Williamsburg Summit meeting, 1983. This document contains the complete written record of each of the three FWG meetings which include the minutes, lists of attendees, agendas, statements, and summary conclusions as well as the full reports of the Technical Working Party. In addition, there is a pertinent exchange of correspondence between FWG members on the role of the Technical Working Party and a requested background paper on the modalities associated with a possible future ETR project

  18. Business in Social Work Education: A Historically Black University's Social Work Entrepreneurship Project

    Science.gov (United States)

    Archibald, Paul; Muhammad, Omar; Estreet, Anthony

    2016-01-01

    The destabilization of the current economy has sparked increased interest in entrepreneurship, especially for underrepresented minority social work students. The entrepreneurial thinking of these social work students entering social work programs at historically Black colleges and universities needs to be fostered in a learning environment. This…

  19. Tkinter GUI application development blueprints build nine projects by working with widgets, geometry management, event handling, and more

    CERN Document Server

    Chaudhary, Bhaskar

    2018-01-01

    Tkinter is the built-in GUI package that comes with standard Python distributions. It is a cross-platform package, which means you build once and deploy everywhere. It is simple to use and intuitive in nature, making it suitable for learners. This book will enable you to use Tkinter effectively through working on nine versatile projects.

  20. The "Project": Putting Student Controlled, Small Group Work and Transferable Skills at the Core of a Geography Course.

    Science.gov (United States)

    Hindle, Brian Paul

    1993-01-01

    Describes how a cooperative group project has become a foundation of the first two years of a three-year program in college-level geography. Discusses the origin, development, and topic selection for each of the cohort groups working in the program. Asserts that the program has been favorably received by both students and faculty members. (CFR)

  1. Project Management as a means of knowledge communication for the Information economy

    DEFF Research Database (Denmark)

    Kampf, Constance

    Currently Project Management as a field is understood from an engineering and management perspective as a system of planning, managing and monitoring work processes involved in projects.  The systems focus does not preclude communication as an important element, but it does not synthesize...... communication concepts with project management practices. Understanding Project Management from a communication perspective entails synthesizing key concepts from Knowledge Communication, Knowledge Management and Rhetoric.  From Knowledge Communication, key concepts include Wenger's Communities of Practice...... (1998), Nonaka & Takeuchi´s' SECI model describing the relationship between tacit and explicit knowledge in the context of knowledge creation (1995), and Davenport & Prusak's problematization of knowledge definitions in Working Knowledge (1998, 2000).  From a Knowledge Management Perspective, key...

  2. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-02

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

  3. Proposal for the extension of a partner project agreement with ISTC ? ATLAS collaboration

    CERN Document Server

    2000-01-01

    This document concerns the extension of the scope of work covered by a partner project agreement with the ISTC, namely Partner Project Agreement 1800p for Manufacturing, Assembly and Testing of the End-cap Transition Radiation Tracker (TRT) for the ATLAS Experiment at the CERN LHC. This Partner Project Agreement was approved by Council on 23 June 2000 (c.f. draft minutes of the meeting CERN/2340/Draft). For reasons set out in this document the Finance Committee is invited to approve the extension of the scope of work covered by Partner Project Agreement 1800p to include the Manufacturing, Assembly and Testing of type C End-cap support rings for a total amount of 503 720 Swiss francs.

  4. On A Project Work for International Students Paired with Japanese Partners in a Summer Intensive Japanese Program for Science and Technology

    Science.gov (United States)

    Fudano, Hiroko

    A project work in which learners of a foreign language engage in a task with the native speakers is one of the effective ways to bring in ample real communication opportunities to a classroom. This scheme also gives both parties meaningful experiences for intercultural understanding. This paper reports a “Pythagoras” machine production project in which international students were paired up with Japanese students as a part of a Japanese for science and technology course in a summer intensive program. Based on the participants‧ course evaluation data, the paper also discusses the effectiveness of the project for Japanese language learning and for promoting intercultural understanding.

  5. Marine radioecology. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-06-01

    The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs

  6. Utah Text Retrieval Project

    Energy Technology Data Exchange (ETDEWEB)

    Hollaar, L A

    1983-10-01

    The Utah Text Retrieval project seeks well-engineered solutions to the implementation of large, inexpensive, rapid text information retrieval systems. The project has three major components. Perhaps the best known is the work on the specialized processors, particularly search engines, necessary to achieve the desired performance and cost. The other two concern the user interface to the system and the system's internal structure. The work on user interface development is not only concentrating on the syntax and semantics of the query language, but also on the overall environment the system presents to the user. Environmental enhancements include convenient ways to browse through retrieved documents, access to other information retrieval systems through gateways supporting a common command interface, and interfaces to word processing systems. The system's internal structure is based on a high-level data communications protocol linking the user interface, index processor, search processor, and other system modules. This allows them to be easily distributed in a multi- or specialized-processor configuration. It also allows new modules, such as a knowledge-based query reformulator, to be added. 15 references.

  7. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  8. UBERA-6 project: Achievements of 4 working years

    International Nuclear Information System (INIS)

    Blaumann, H; Fernandez, C; Dell Occhio, L; D Ovidio, C; Fabro, J; Miceli, M; Novara O; Perez, A; Taboada, H

    2009-01-01

    On May 2005 the President of CNEA created the UBERA-6 project, belonging to the former Technology and Environmental Management, with the aim to convert to Low Enriched Uranium (LEU) the RA-6 reactor core, to swap with the US Department of Energy (US-DoE) equivalent inventories of High Enriched Uranium (HEU) for LEU, to export to USA the spent HEU core and to recover and downblend to LEU remnant HEU inventories contained in fuel and irradiation target scraps. By means of two contracts signed by CNEA and US-DoE, acquisition of consumables and graphite reflectors, the fabrication of LEU core replacement, conditioning, transport and exportation of spent HEU core and subsequent supply of fresh LEU for fuel and irradiation targets used in our research reactors were costed. During July, 2006 468 HEU based fresh plates were exported to USA. On June 30th, 2007 the RA-6 reactor temporarily stopped working and its personnel remover the HEU core to the auxiliary pool. On November 7th the former spent HEU based core was exported to USA. During May and July, 2008 the new RA-6 reactor LEU based core and control assemblies were provided. During March, 2009 the RA-6 reactor became critical. For recovering and blending down of remnant HEU inventories, the Triple Height Laboratory (LTA) was refurbished. A Supplemental Agreement to one of the original contract between CNEA and US-DoE will financially support the refurbishment of the Radiochemical Facility Laboratory (LFR) and so reprocess irradiated HEU retained in radioisotope production filters to downblend into LEU, as well as the separation of the pair Sr90-Y90 and of Cs137 inventories for further application in Nuclear Medicine. [es

  9. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  10. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  11. The Aeolus project: Science outreach through art.

    Science.gov (United States)

    Drumm, Ian A; Belantara, Amanda; Dorney, Steve; Waters, Timothy P; Peris, Eulalia

    2015-04-01

    With a general decline in people's choosing to pursue science and engineering degrees there has never been a greater need to raise the awareness of lesser known fields such as acoustics. Given this context, a large-scale public engagement project, the 'Aeolus project', was created to raise awareness of acoustics science through a major collaboration between an acclaimed artist and acoustics researchers. It centred on touring the large singing sculpture Aeolus during 2011/12, though the project also included an extensive outreach programme of talks, exhibitions, community workshops and resources for schools. Described here are the motivations behind the project and the artwork itself, the ways in which scientists and an artist collaborated, and the public engagement activities designed as part of the project. Evaluation results suggest that the project achieved its goal of inspiring interest in the discipline of acoustics through the exploration of an other-worldly work of art. © The Author(s) 2013.

  12. Smart and intelligent sensor payload project

    Science.gov (United States)

    2009-01-01

    Engineers working on the smart and intelligent sensor payload project include (l to r): Ed Conley (NASA), Mark Mitchell (Jacobs Technology), Luke Richards (NASA), Robert Drackett (Jacobs Technology), Mark Turowski (Jacobs Technology) , Richard Franzl (seated, Jacobs Technology), Greg McVay (Jacobs Technology), Brianne Guillot (Jacobs Technology), Jon Morris (Jacobs Technology), Stephen Rawls (NASA), John Schmalzel (NASA) and Andrew Bracey (NASA).

  13. Fabrication and installment of the hard-wired I and C works for the neutral beam injection test stand of the K-STAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun

    2004-12-01

    Instrumentation and Control(I and C) of the neutral beam injection test stand (NBI-TS) for the K-STAR national fusion research project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. Another one to be mentioned is the interlock circuitry. One of the interlock circuits are related to the coolant flow failure. The other is the interlock circuit related to the vacuum failure. All of the above mentioned circuitry now constitutes integral parts for the proper operation of the NBI system; details of those hard-wired I and C work are described in this report

  14. Project for a renewable energy research centre

    Directory of Open Access Journals (Sweden)

    Andrea Giachetta

    2011-04-01

    Full Text Available In Liguria, where sustainable approaches to the design, construction and management of buildings enjoy scant currency, the idea of a company from Milan (FERA s.r.l. setting up a research centre for studies into renewable energy resources, could well open up very interesting development opportunities.The project includes: environmental rehabilitation (restoration projects; strategies for the protection of water resources and waste management systems; passive and active solar systems (solar thermal and experiments with thermodynamic solar energy; hyperinsulation systems, passive cooling of buildings; use of natural materials; bio-climatic use of vegetation. The author describes the project content within the context of the multidisciplinary work that has gone into it.

  15. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    Energy Technology Data Exchange (ETDEWEB)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A. [Royal Inst. of Tech., Stockholm (Sweden). Div. of Nuclear Power Safety; Helle, M.; Kymaelaeinen, O.; Tuomisto, H. [IVO Power Engineering Ltd., Vantaa (Finland); Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A. [CEA - Grenoble (France); Turland, B.D.; Dobson, G.P. [AEA Technology plc, Dorchester (United Kingdom); Siccama, A. [ECN Nuclear Research, Petten (Netherlands); Ikonen, K. [VTT Energy, Helsinki (Finland); Parozzi, F. [ENEL - SRI/PAM/GRA, Segrate, MI (Italy); Kolev, N. [Siemens AG, Erlangen (Germany); Caira, M. [Univ. of Roma (Italy)

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues.

  16. Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH) | Division of Cancer Prevention

    Science.gov (United States)

    Speaker | "Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH)" will be presented by Lorna H. McNeill, PhD, MPH, Chair of the Department of Health Disparities at the University of Texas MD Anderson Cancer Center in Houston, TX. Date: 2/20/2018; Time: 11:00am - 12:00pm; Location: NCI Shady Grove Campus,

  17. Myoglobin structure and function: A multiweek biochemistry laboratory project.

    Science.gov (United States)

    Silverstein, Todd P; Kirk, Sarah R; Meyer, Scott C; Holman, Karen L McFarlane

    2015-01-01

    We have developed a multiweek laboratory project in which students isolate myoglobin and characterize its structure, function, and redox state. The important laboratory techniques covered in this project include size-exclusion chromatography, electrophoresis, spectrophotometric titration, and FTIR spectroscopy. Regarding protein structure, students work with computer modeling and visualization of myoglobin and its homologues, after which they spectroscopically characterize its thermal denaturation. Students also study protein function (ligand binding equilibrium) and are instructed on topics in data analysis (calibration curves, nonlinear vs. linear regression). This upper division biochemistry laboratory project is a challenging and rewarding one that not only exposes students to a wide variety of important biochemical laboratory techniques but also ties those techniques together to work with a single readily available and easily characterized protein, myoglobin. © 2015 International Union of Biochemistry and Molecular Biology.

  18. Description of SODAR data storage. WISE project WP2

    International Nuclear Information System (INIS)

    Barhorst, S.A.M.; Verhoef, J.P.; Van der Werff, P.A.; Eecen, P.J.

    2003-10-01

    The partners in the WISE project are investigating whether application of the SODAR (sonic detection and ranging) measurement technique in wind energy experimental work is feasible as a replacement for cup anemometers and wind direction sensors mounted on tall meteorological masts both from the view of accuracy and cost. In Work Package 2 (WP2) of the WISE project extensive controlled experiments with the SODAR have been performed. For example, SODAR measurements have been compared with measurements from nearby masts and different brands of SODARs have been compared. Part of the work package was the creation of a database to gather the measured SODAR data. The database was created by ECN in order to enable further analysis by the partners in the project. The database structure that has been defined by ECN is described in full detail. The database is based on SQL (structured query language), and care is taken that data that is unchanged during a measurement period is only stored once. The logic behind the structure is described and the relations between the various tables are described. Up to now the description of the database is limited to include SODAR data measured close to a meteorological mast. Power measurements from wind turbines are not yet included. However, the database can easily be extended to include these data. The data measured by means of the ECN SODAR have completely been re-processed. A new directory structure was defined which is accessible from both the Unix (Linux) and the Microsoft Windows platform. The processed and validated data have been stored in a database to make retrieval of specific data sets possible. The database is also accessible from the Windows platform. The defined format is available for the WISE project, so that the database containing data from all partners can be created

  19. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  20. The Third Annual NASA Science Internet User Working Group Conference

    Science.gov (United States)

    Lev, Brian S. (Editor); Gary, J. Patrick (Editor)

    1993-01-01

    The NASA Science Internet (NSI) User Support Office (USO) sponsored the Third Annual NSI User Working Group (NSIUWG) Conference March 30 through April 3, 1992, in Greenbelt, MD. Approximately 130 NSI users attended to learn more about the NSI, hear from projects which use NSI, and receive updates about new networking technologies and services. This report contains material relevant to the conference; copies of the agenda, meeting summaries, presentations, and descriptions of exhibitors. Plenary sessions featured a variety of speakers, including NSI project management, scientists, and NSI user project managers whose projects and applications effectively use NSI, and notable citizens of the larger Internet community. The conference also included exhibits of advanced networking applications; tutorials on internetworking, computer security, and networking technologies; and user subgroup meetings on the future direction of the conference, networking, and user services and applications.

  1. Annual report of the Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusin Working Group (FWG))

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1987-04-01

    The Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusion Working Group (FWG)) was established in 1983 in response to the Declaration of the Heads of State and Government at the Versailles Economic Summit meeting of 1982, and in response to the subsequent report of the Working Group in Technology, Growth and Employment (TGE) as endorsed at the Williamsburg Summit meeting, 1983. This document contains the complete written record of each of the three FWG meetings which include the minutes, lists of attendees, agendas, statements, and summary conclusions as well as the full reports of the Technical Working Party. In addition, there is a pertinent exchange of correspondence between FWG members on the role of the Technical Working Party and a requested background paper on the modalities associated with a possible future ETR project.

  2. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  3. Evaluation of the Self-Employment for Gecekondu Women Project, November 1995-June 1998. Working Papers in Early Childhood Development.

    Science.gov (United States)

    Aksoy, Asu; Schilen, Sandra; Ulgen, Tulu

    This paper stems from an evaluation of Turkey's first microcredit project aimed specifically at women, which was carried out with data derived through the Foundation for the Support of Women's Work (FFSW)'s Management Information System (which tracks credit users and repayment performance), application forms from women who applied for and received…

  4. Implementation of Work Package 7 (WP7) - a condition for achieving the CORONA project goals

    International Nuclear Information System (INIS)

    Tsakov, T.; Ilieva, M.; Miteva, R.

    2013-01-01

    Project CORONA 'Construction of a regional center for WWER competencies and nuclear technology' is a three year project co-funded by the European Commission coordinated by Kozloduy NPP and another 10 participants from eight countries. Work Package 7 (WP7) - 'Assessment and recommendations for sustainable development of regional Center for WWER nuclear technology and competence', aims to summarize and analyzing the results of the implementation of activities within the defined work packages: WP1 - Identification of training needs for all target groups; WP2 - Creating a scheme for training of nuclear scientists and researchers with the technology of WWER; WP3 - Create a schedule for training of non-nuclear specialists and subcontractors with the basics of technology WWER; WP4 - Establishing a scheme for specialized training of students with technology WWER; WP5 - Creation of a scheme for implementing and enhancing safety culture; WP6 - Creating a portal for knowledge management technology with WWER; Analysis of the results of the activity should provide conditions for creation of conditions for continued development of a regional center for obtaining and maintaining the knowledge of professionals applying WWER technology by integrating the experience of different organizations, research centers and the WWER units, in the process of creating frames for maintenance and development of this technology. By establishing the regional center will be unified schemes for qualification of personnel applying WWER technology in accordance with the standards of the International Atomic Energy Agency and the generally accepted criteria for education and vocational training in the European Community. Integrating the experience of different organizations NPP and research centers will enable to define schemes and programs for continuous education and training to be recognized in the EU from around the nuclear sector and the European Credit System for Vocational

  5. Working group report on forestry

    International Nuclear Information System (INIS)

    MacIver, D.

    1991-01-01

    The results and conclusions of a working group held to discuss the state of knowledge and information needs concerning potential climate change implications for forestry are presented. The lack of knowledge in some basic processes, for example physiological and genetics, limits ability to evaluate and project the adaptation and responses to climate change. Areas where knowledge is weak include: the potential maximum productivity for a given climate region; the extent to which climate change can be accomodated by genetic adaptation; ways to improve the temporal/spatial distribution of projected precipitation and temperature changes and their magnitudes; the effect of global warming on fire severity and behavior; the current lightning distribution and relationship to fire and the response of this to global warming; socio-economic needs and constraints for management of wilderness areas; carbon dioxide enrichment effects on forest growth and water use efficiency; carbon benefits associated with afforestation and other carbon sequestering programs; impacts of forest practices on the carbon cycle; and the definition of biological diversity on the Great Plains. Recommended research initiatives include improving climate projections, targetted biological process research, monitoring for change and adaptive management, and development of decision support systems

  6. The Chernobyl reactor accident, ten years on. Teaching projects for mathematics instruction in interdisciplinary working groups

    International Nuclear Information System (INIS)

    Boer, H.; Delle, E.; Mies, K.; Warmeling, A.

    1996-01-01

    The booklet presents background information and addresses the following aspects: ionizing radiation and radiation effects; safety of German nuclear power plants; statistical evidence of radiation injuries; short-lived and long-lived ionizing radiation; radioactive waste; CO 2 emissions as an argument in favour of nuclear power generation. The material presented is intended for use by a school project team interested in the subjects, or as a basis for collaborative, interdisciplinary teaching in working groups, and it offers information and problems for mathematics teaching. (HP) [de

  7. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  8. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  9. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  10. The National Program for Occupational Safety and Health in Agriculture. 1992 Project Facts.

    Science.gov (United States)

    National Inst. for Occupational Safety and Health (DHHS/PHS), Cincinnati, OH.

    This book contains information about a project instituted in 1990 by the National Institute for Occupational Safety and Health (NIOSH) to prevent work-related diseases and injuries among agricultural workers. Included are facts about 25 projects within NIOSH and 42 cooperative agreements between NIOSH and institutions in 25 states. These…

  11. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  12. Project Soar.

    Science.gov (United States)

    Austin, Marion

    1982-01-01

    Project Soar, a Saturday enrichment program for gifted students (6-14 years old), allows students to work intensively in a single area of interest. Examples are cited of students' work in crewel embroidery, creative writing, and biochemistry. (CL)

  13. Evaluation of a workplace engagement project for people with younger onset dementia.

    Science.gov (United States)

    Robertson, Jacinta; Evans, David

    2015-08-01

    In 2011, a workplace project was established to provide a small group of people who had younger onset dementia with the opportunity to return to the workplace. The project sought to explore the feasibility and safety of engaging these younger people in workplace activities if an appropriate framework of support was provided. Opportunities to engage in meaningful activities are quite limited for younger people with dementia because services are targeted at an older client population. A qualitative exploratory approach was used for the project evaluation. Participants were people who were 65 years or younger and had a diagnosis of dementia. They attended a large metropolitan hardware store one day per week and worked beside a store employee for a four hour work shift. Evaluation of the project included observation of participant's engagement in the workplace, adverse events and a qualitative analysis that used participant-nominated good project outcomes. Nine people with a mean age of 58·8 years participated in the project. Six of these participants have been engaged at the workplace for more than two years. All participants were able to gain the skills needed to complete their respective work duties. Participants initially assisted with simple work tasks, but over time, they were able to expand their range of duties to include more complex activities such as customer sales. Participants achieved their nominated good outcomes of improved well-being, engaging in worthwhile activities, contributing to society and socialisation. The evaluation has shown that this workplace programme is a viable model of engagement for younger people with dementia. This evaluation offers a practical demonstration that it is feasible and safe to provide opportunities for younger people with dementia to engage in meaningful activities in the community if appropriate support is provided. © 2015 John Wiley & Sons Ltd.

  14. Methodology for quantification of waste generated in Spanish railway construction works

    International Nuclear Information System (INIS)

    Guzmán Báez, Ana de; Villoria Sáez, Paola; Río Merino, Mercedes del; García Navarro, Justo

    2012-01-01

    Highlights: ► Two equations for C and D waste estimation in railway construction works are developed. ► Mixed C and D waste is the most generated category during railway construction works. ► Tunnel construction is essential to quantify the waste generated during the works. ► There is a relationship between C and D waste generated and railway functional units. ► The methodology proposed can be used to obtain new constants for other areas. - Abstract: In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C and D) waste. Specifically, in 2006, Spain generated roughly 47 million tons of C and D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C and D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C and D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C and D waste management in railway projects, by developing a model for C and D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C and D waste likely to be generated in railway construction projects, including the category of C and D waste generated for the entire project.

  15. Physics from angular projection of rectangular grids

    International Nuclear Information System (INIS)

    Singh, Ashmeet

    2015-01-01

    In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple yet interesting, problem has both scholarly value and applications for data extraction techniques to study the physics of various systems. Our work may help undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential applications in various branches of physical sciences, including crystallography, astrophysics, and bulk properties of materials. (paper)

  16. The work of the NRPB 1974/76

    International Nuclear Information System (INIS)

    1977-01-01

    The report on the work of the (UK) National Radiological Protection Board is in sections entitled: functions and organisation; general survey (including activities relating to nuclear power, the newly established arrangements with the Health and Safety Commission, and International cooperation); the assessment of human exposure to ionising radiations; technical services (including personal monitoring, and assessment of radiation hazards in various incidents); instrumentation and equipment; research in biology; research in physics (including various projects on dosimetry); list of publications by Board Staff; Radiological Protection Bulletin 1974 to 1976 (contents). (U.K.)

  17. Summary of the activities of the ISAM Confidence Building Working Group

    International Nuclear Information System (INIS)

    Dolinar, G.M.; Batandjieva, B.

    2002-01-01

    During the early stages of the ISAM project confidence building was a relatively new topic in the radioactive waste disposal literature, but it was beginning to receive some attention. Although almost all safety assessment activities are intended to provide a level of confidence in the results of the assessment, considering the activities from the viewpoint of how they contributed to the decision making of various 'audiences' was relatively new. The ISAM project included the Confidence Building Working Group (CBWG) to examine the topic of Confidence Building and this paper provides a summary of the working group findings. (author)

  18. Research work for improving LWR safety. 1991 annual report

    International Nuclear Information System (INIS)

    1992-08-01

    The work performed in 1991 for the PNS project centers on various phenomena of severe fuel damage and on selected aspects of a core meltdown accident, relating to aerosol behaviour and filter engineering, and to methods of assessing and minimizing the radiological impacts of a reactor accident. One paper included in this annual report summarizes the evaluation of experiments carried out in 1990 at the Wuerenlingen PROTEUS reactor. The 1991 task programme of the project for the first time included research into extreme load conditions affecting the containment in a core meltdown accident; first results are given of the experiments performed. (orig./DG) [de

  19. Optimizing strategy software for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1 Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2 Visualizing and viewing the generated optimal trade-off; and (3 Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; (4 A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS to an optimization expressway of repetitive construction project.

  20. Site observational work plan for the UMTRA Project Site at Riverton, Wyoming. Revision 3/95

    International Nuclear Information System (INIS)

    1995-03-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Riverton, Wyoming, site, is governed by the Uranium Mill Tailings Radiation Control Act and the US Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. The compliance strategy proposed for this site is natural flushing in conjunction with institutional controls. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels or alternate concentration limits that do not pose a risk to human health or the environment within 100 years. This document contains the following sections. Section 2.0 of this SOWP describes the requirements for meeting standards at UMTRA Project sites. Section 3.0 provides site-specific data and the related conceptual model. Section 4.0 provides the justification for the recommended ground water compliance strategy for the Riverton site. Section 5.0 provides the justification and process for collection and assessment of additional required data. Section 6.0 provides a list of the references cited. The appendixes include data on monitor wells and lithography, ground water, surface water, and sediment quality