WorldWideScience

Sample records for project implementation funding

  1. 197 impact of project funding on the implementation of leemp

    African Journals Online (AJOL)

    2007-10-31

    Oct 31, 2007 ... the positive growth of the social welfare and functions of the populace. ... In the light of the above, this study has the objective of examining the effectiveness of the funds budgeted for LEEMP projects since inception by the ...

  2. Impact of project funding on the implementation of LEEMP ...

    African Journals Online (AJOL)

    The implementation process could make a project succeed, fail or even abandoned midstream. Information gathered from LEEMP in Imo State indicates that out of the 258 development projects embarked upon by LEEMP, only 24.4% have been completed while 75.6% are at their various completion stages after committing ...

  3. ON THE QUESTION OF CORPORATE FUNDING IMPLEMENTATION OF EXPLORATION AND PRODUCTION INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Voronin D. M.

    2016-03-01

    Full Text Available As part of the research, the content of the required theoretical and methodological tools in the field of corporate finance investment projects of exploration and production of hydrocarbons described. Indicated cash flow characteristics of such projects in accordance with the phases of the project, identified the risks associated with cash flows. In practical terms, the proposed approach to the financing of projects includes sequential algorithm deciding on the implementation of funding is considered on case studies and can be used in the process of financial planning oil and gas companies, in building policy project financing, corporate procedures and regulations. In solving problems of theoretical and applied scientific methods used in the study, including methods of logical, comparative and systematic analysis, as well as methods of economic-mathematical modeling.

  4. Decommissioning funding: ethics, implementation, uncertainties

    International Nuclear Information System (INIS)

    2006-01-01

    This status report on Decommissioning Funding: Ethics, Implementation, Uncertainties also draws on the experience of the NEA Working Party on Decommissioning and Dismantling (WPDD). The report offers, in a concise form, an overview of relevant considerations on decommissioning funding mechanisms with regard to ethics, implementation and uncertainties. Underlying ethical principles found in international agreements are identified, and factors influencing the accumulation and management of funds for decommissioning nuclear facilities are discussed together with the main sources of uncertainties of funding systems. (authors)

  5. Kryolize - KT Fund Project

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    Safety standards and best practices do exist in the field of cryogenics but, as in most domains, they are generally inserted in a few ‘envelope’ cases commonly used in the industry, whereas applicability to the particularity of research facilities are not fully tailored to its needs. The main objective in these cases is to find a harmonised approach, based on lessons learnt and scientific knowledge. The Kryolize Project was created in order to produce tools with a harmonized approach to size pressure relief devices for cryogenic applications. In view of disseminating such tools to other institutes and industrial partners, the project was submitted to CERN’s KT Fund committee. This talk will focus on the process and deliverables of the KT-Funded Kryolize project, including the method on how to cope with the sizing of pressure relief devices and the R&D collaboration agreement between CERN and Karlsruhe Institute of Technology for an experimental programme.

  6. Decommissioning Funding: Ethics, Implementation, Uncertainties

    International Nuclear Information System (INIS)

    2007-01-01

    This status report on decommissioning funding: ethics, implementation, uncertainties is based on a review of recent literature and materials presented at NEA meetings in 2003 and 2004, and particularly at a topical session organised in November 2004 on funding issues associated with the decommissioning of nuclear power facilities. The report also draws on the experience of the NEA Working Party on Decommissioning and Dismantling (WPDD). This report offers, in a concise form, an overview of relevant considerations on decommissioning funding mechanisms with regard to ethics, implementation and uncertainties. Underlying ethical principles found in international agreements are identified, and factors influencing the accumulation and management of funds for decommissioning nuclear facilities are discussed together with the main sources of uncertainties of funding systems

  7. Innovative funding solution for special projects: Crowd funding

    Directory of Open Access Journals (Sweden)

    Sentot Imam Wahjono

    2015-06-01

    Full Text Available The aim of this paper is to examine the influence of crowd funding knowledge, applica-tion, platform, and project initiator toward successful crowd funding. This study conducted by quantitative approach, data have been collected with web-based ques-tionnaires via Kickstarter.com direct message and e-mail to 200 successful crowd funding project initiators as a sample and as much 152 sets questionnaire returned by a complete answer and should be analyzed further. Deployment and data collection take 3 month from October to December 2013. This study found evidence that crowd funding knowledge, crowd funding application, crowd funding platform, and project initiator has positive and significant relationship toward the success of crowd funding. The implication from this research is crowd funding can be a source of capital to finance the projects, not just rely on traditional sources of financing just like banking and capital markets. Crowd funding can be innovative funding solution.

  8. Terms and conditions for Diesel Emissions Reduction Act Smartway financing projects where an eligible nonprofit grantee is implementing a loan program and loan Recipients will use the loan funds for activities that trigger Davis Bacon

    Science.gov (United States)

    Use this T&C for DERA Smartway financing projects where an eligible nonprofit grantee is implementing a loan program and loan Recipients will use the loan funds for activities that trigger Davis Bacon.

  9. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  10. Influence of Intelletual Stimulation and Conflict Resolution on Project Implementation: A case of Constituency Development Fund Construction Projects in Public Secondary Schools in Kisumu County, Kenya

    Directory of Open Access Journals (Sweden)

    Janet Wagude

    2015-11-01

    Full Text Available Intellectual stimulation is one of the manifestations of transformational leadership. Intellectual stimulation is the aspect of leadership where the leader encourages teams’ ingenuity, creativity and innovative thinking, urging them to keenly question the status quo in order to make discoveries. The purpose of this study was to explore the Influence of intellectual stimulation and conflict resolution on projects implementation. The objective was to determine the Influence of intellectual stimulation and conflict resolution on projects implementation. The study used Expost facto design. Multifactor leadership Questionnaire, Thomas Kilman Instruments, Interview, and documentary analysis were used as tools for data collection. The probability sampling used was stratified and simple random sampling technique. Data was analyzed both quantitatively and qualitatively. Multiple linear regression analysis was used as tool of analysis to test for significance in the hypothesis. One hypothesis was formulated and subsequently tested in the study in order to establish the influence of conflict resolution thereof, in hypothesis H1,( H0: The strength of the relationship between intellectual stimulation and implementation of CDF construction projects does not depend on conflict resolution., it was concluded that the strength of the relationship between intellectual stimulation and implementation of CDF construction projects depends on conflict resolution(P=0.001˂P=0.05,using multiple linear regression analysis the following results were obtained- F value of 7.788,d.f (2,59 and (P-value 0.00˂P= 0.05 significance level which was statistically significant. It was therefore concluded that there is a regression relationship between intellectual stimulation with conflict resolution and implementation of CDF projects. It is therefore recommended that accredited MLQ coaching is desirable, coaching from the systems’ psychodynamic stance could equip the leader in

  11. The Control of the Implementation and Management of European Funds

    Directory of Open Access Journals (Sweden)

    Vasile Burja

    2018-03-01

    Full Text Available Effective implementation and management of European funds is of major importance for the new members of the European Union. Controlling these funds aims to increase the performance of their use. European regulations require Member States to take appropriate measures to properly maintain and operate their management and control systems so that they can offer the necessary assurances regarding the correct use of the allocated funds. This article highlights the importance of control exercised within institutions that implement and manage European funds. There have been many irregularities in the implementation of projects funded by European funds. In order to determine the most frequent types of irregularities, a questionnaire was applied to the experts responsible for controlling European funds in intermediary bodies. In this article we will present the results obtained after the centralization of expert responses and the importance of control in the prevention of irregularities and fraud.

  12. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  13. Funding and Implementing Universal Access

    International Development Research Centre (IDRC) Digital Library (Canada)

    The principles for the subsidy awards are based not only on the experience of ... the best-practice model for special funding to support access to communications .... Malaysia, Russia, Mongolia and elsewhere).5 The Ugandan model uses the ...... services or serve additional areas, access to radio spectrum and lower taxes.

  14. Implementing the global plan to stop TB, 2011-2015--optimizing allocations and the Global Fund's contribution: a scenario projections study.

    Directory of Open Access Journals (Sweden)

    Eline L Korenromp

    Full Text Available BACKGROUND: The Global Plan to Stop TB estimates funding required in low- and middle-income countries to achieve TB control targets set by the Stop TB Partnership within the context of the Millennium Development Goals. We estimate the contribution and impact of Global Fund investments under various scenarios of allocations across interventions and regions. METHODOLOGY/PRINCIPAL FINDINGS: Using Global Plan assumptions on expected cases and mortality, we estimate treatment costs and mortality impact for diagnosis and treatment for drug-sensitive and multidrug-resistant TB (MDR-TB, including antiretroviral treatment (ART during DOTS for HIV-co-infected patients, for four country groups, overall and for the Global Fund investments. In 2015, China and India account for 24% of funding need, Eastern Europe and Central Asia (EECA for 33%, sub-Saharan Africa (SSA for 20%, and other low- and middle-income countries for 24%. Scale-up of MDR-TB treatment, especially in EECA, drives an increasing global TB funding need--an essential investment to contain the mortality burden associated with MDR-TB and future disease costs. Funding needs rise fastest in SSA, reflecting increasing coverage need of improved TB/HIV management, which saves most lives per dollar spent in the short term. The Global Fund is expected to finance 8-12% of Global Plan implementation costs annually. Lives saved through Global Fund TB support within the available funding envelope could increase 37% if allocations shifted from current regional demand patterns to a prioritized scale-up of improved TB/HIV treatment and secondly DOTS, both mainly in Africa--with EECA region, which has disproportionately high per-patient costs, funded from alternative resources. CONCLUSIONS/SIGNIFICANCE: These findings, alongside country funding gaps, domestic funding and implementation capacity and equity considerations, should inform strategies and policies for international donors, national governments and

  15. FINANCIAL INDICATORS FOR THE IMPLEMENTATION OF AN EUROPEAN FUNDED INVESTMENT PROJECT UNDER SOP IEC PROGRAMME – CASE STUDY OF A ROMANIAN SME

    Directory of Open Access Journals (Sweden)

    Droj Laurentiu

    2010-07-01

    Full Text Available The European Integration came with new challenges for the Romanian enterprises especially for the SMEs, the opportunities arising from operating on the European Single Market and the possibility for accession of European Regional Development Funds. The main programme designed to offer access for small, medium and large Romanian enterprises to European funding is the Sectorial Operational Programme “Increase of Economic Competitiveness”- SOP IEC. This paper will analyze the area of intervention “D1.1. Productive and environment friendly investments and preparation for market competition in which Romanian SMEs” are competing to access European funding in order to develop their activities or to extend them into new ones. One of the main challenges for these SMEs is to generate, fulfil and to respect the financial indicators of the programme, which are part of the financial analysis of the project.

  16. Student Projects as a Funding Source

    Science.gov (United States)

    Henson, Kerry L.

    2010-01-01

    Prompted by restricted funding for a lab which supported student software development work on real-world projects, a contribution program was established to facilitate monetary support from the external clients. The paper explores the relationships between instructor, students and client and how a funding component can affect these ties.…

  17. Budgeting, funding, and managing clinical research projects.

    Science.gov (United States)

    Hatfield, Elizabeth; Dicks, Elizabeth; Parfrey, Patrick

    2009-01-01

    Large, integrated multidisciplinary teams have become recognized as an efficient means by which to drive innovation and discovery in clinical research. This chapter describes how to budget and fund these large studies and effectively manage the large, often dispersed teams involved. Sources of funding are identified; budget development, justification, reporting, financial governance, and accountability are described; in addition to the creation and management of the multidisciplinary team that will implement the research plan.

  18. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  19. Implementing the global plan to stop TB, 2011-2015 - optimizing allocations and the global fund's contribution: A scenario projections study

    NARCIS (Netherlands)

    E.L. Korenromp (Eline); P. Glaziou (Philippe); C. Fitzpatrick (Christopher); K. Floyd (Katherine); M. Hosseini (Mehran); M.C. Raviglione (Mario); R. Atun (Rifat); B. Williams (Brian)

    2012-01-01

    textabstractBackground: The Global Plan to Stop TB estimates funding required in low- and middle-income countries to achieve TB control targets set by the Stop TB Partnership within the context of the Millennium Development Goals. We estimate the contribution and impact of Global Fund investments

  20. A method for evaluating the funding of components of natural resource and conservation projects

    Energy Technology Data Exchange (ETDEWEB)

    Wellington, John F., E-mail: welling@ipfw.edu [Indiana University – Purdue University Fort Wayne (IPFW), Doermer School of Business, 203 Stonegate Drive Erie, PA 16505 (United States); Lewis, Stephen A., E-mail: lewis.sa07@gmail.com [Mongrel Works, LLC., Columbus, OH 43209 (United States)

    2016-02-15

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided.

  1. A method for evaluating the funding of components of natural resource and conservation projects

    International Nuclear Information System (INIS)

    Wellington, John F.; Lewis, Stephen A.

    2016-01-01

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided

  2. CRITICAL SUCCESS FACTORS FOR INFRASTRUCTURE EUROPEAN FUNDED PROJECTS

    Directory of Open Access Journals (Sweden)

    Sebastian-Ion Ceptureanu

    2016-07-01

    Full Text Available Absorption of European funds is on top of Romania’s public agenda for the last years although the first programming period has ended and the necessary lessons were learned so far. To have a high degree of absorption of funds provided by the EU must be of quality projects and their implementation to be successful. Through this work we aimed to investigate the success factors of infrastructure projects with European funding in Romania, Bulgaria, Moldova, Ukraine, Serbia and Kosovo, and identify critical success factors of these projects through a research surveying the teams of consultants and support personnel from the countries in an international consulting company. The research results are therefore constitute the empirical evidence of what constitutes critical success factors of infrastructure projects financed by the European Union and can be used as a starting point for scientific studies of the management of European projects or other actions that investigates measures that can be taken to improve the success rate of projects implemented in the area mentioned above.One of the contributions of this paper is to identify the critical success factors of success factors present in literature. With more so as they are critical success factors of infrastructure projects with European funding still required field studies and analysis performed in the present context. In addition, the critical factors were operationalized in a conceptual framework. Moreover, this framework includes leadership style of project manager as critical success factor has been identified in the research as the most important in the context in which it was conducted. As such, this paper demonstrates, with the necessary limitations, the importance of management style of project managers in the context of specific European funded infrastructure projects. And this is happening even though there are sophisticated project management tools availabe and relevant knowledge exists

  3. 15 CFR 917.22 - National Projects funding.

    Science.gov (United States)

    2010-01-01

    ... Projects funding proposals will be expected to address: (1) The relevance of the proposed project to a... projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed... National Projects can be up to 100 percent of the total cost of the project involved. ...

  4. FAA Loran early implementation project

    Science.gov (United States)

    1990-03-01

    The Early Implementation Project (EIP), established by FAA Administrator Admiral : Donald C. Engen, was the initial step in the process of Loran integration into the : National Airsace System (NAS). The EIP was designed to give the FAA and the Loran ...

  5. Dissemination and Implementation Research Funded by the US National Institutes of Health, 2005–2012

    OpenAIRE

    Tinkle, Mindy; Kimball, Richard; Haozous, Emily A.; Shuster, George; Meize-Grochowski, Robin

    2013-01-01

    Dissemination and implementation (D&I) research is a growing area of science focused on overcoming the science-practice gap by targeting the distribution of information and adoption of interventions to public health and clinical practice settings. This study examined D&I research projects funded under specific program announcements by the US National Institutes of Health (NIH) from 2005 to 2012. The authors described the projects' D&I strategies, funding by NIH Institute, focus, characteristi...

  6. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  7. Results of nine Connecticut Cancer Partnership implementation projects.

    Science.gov (United States)

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  8. 45 CFR 2553.72 - What are project funding requirements?

    Science.gov (United States)

    2010-10-01

    ... local funding sources during the first three years of operations; or (2) An economic downturn, the... sources of local funding support; or (3) The unexpected discontinuation of local support from one or more... 45 Public Welfare 4 2010-10-01 2010-10-01 false What are project funding requirements? 2553.72...

  9. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  10. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  11. Australia to fund HIV / AIDS projects in Southeast Asia.

    Science.gov (United States)

    1994-12-19

    Australia will fund 23 new HIV-AIDS projects in Southeast Asian countries, the government announced. "Asia is predicted to be the major growth area for human immunodeficiency virus (HIV) infections over the next decade, " Minister for Development Cooperation Gordon Bilney said. "These projects, worth some $4.35 million over three years, will help meet the challenge of preventing the spread of the disease in the region." The projects--in Thailand, Vietnam, the Philippines, Indonesia, Malaysia and Cambodia--emphasize education and prevention activities as well as programs which focus on the care and support of people living with HIV, Bilney said. He also said a variety of Australian and overseas organizations will implement the projects, many of which will feature the significant involvement of communities at risk and people with HIV. "It is in keeping with the fundamental spirit of the aid program that we should seek to share this expertise with our neighbors in the region." Bilney said one Australian success story--the creative "Streetwize comics" (publications in Australia which help street kids and under privileged kids understand HIV/AIDS problems)--will be piloted in Vietnam in conjunction with the Vietnam Youth Federation. He said Vietnamese staff will be trained in the production of a series of bilingual mini-comics on HIV-AIDS prevention for youth. "This project will receive funding of $187,500 over three years," Bilney said. Bilney said the projects would help minimize the individual and social impact of the epidemic in the targeted countries. full text

  12. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    Science.gov (United States)

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  13. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  14. Reality check in the project management of EU funding

    Science.gov (United States)

    Guo, Chenbo

    2015-04-01

    A talk addressing workload, focuses, impacts and outcomes of project management (hereinafter PM) Two FP7 projects serve as objects for investigation. In the Earth Science sector NACLIM is a large scale collaborative project with 18 partners from North and West Europe. NACLIM aims at investigating and quantifying the predictability of the North Atlantic/Arctic sea surface temperature, sea ice variability and change on seasonal to decadal time scales which have a crucial impact on weather and climate in Europe. PRIMO from Political Science is a global PhD program funded by Marie Curie ITN instrument with 11 partners from Europe, Eurasia and BRICS countries focusing on the rise of regional powers and its impact on international politics at large. Although the two projects are granted by different FP7 funding instruments, stem from different cultural backgrounds and have different goals, the inherent processes and the key focus of the PM are quite alike. Only the operational management is at some point distinguished from one another. From the administrative point of view, understanding of both EU requirements and the country-specific regulations is essential; it also helps us identifying the grey area in order to carry out the projects more efficiently. The talk will focus on our observation of the day-to-day PM flows - primarily the project implementation - with few particular cases: transparency issues, e.g. priority settings of non-research stakeholders including the conflict in the human resources field, End-User integration, gender issues rising up during a monitoring visit and ethical aspects in field research. Through a brief comparison of both projects we summarize a range of dos and don'ts, an "acting instead of reacting" line of action, and the conclusion to a systematic overall management instead of exclusively project controlling. In a nutshell , the talk aims at providing the audience a summary of the observation in management methodologies and toolkits

  15. Smokefree implementation in Colombia: Monitoring, outside funding, and business support

    Directory of Open Access Journals (Sweden)

    Randy Uang

    2017-03-01

    Full Text Available Objective. To analyze successful national smokefree policy implementation in Colombia, a middle income country. Materials and methods. Key informants at the national and local levels were interviewed and news sources and government ministry resolutions were reviewed. Results.Colombia’s Ministry of Health coordinated local implementation practices, which were strongest in larger cities with supportive leadership. Nongovernmental organizations provided technical assistance and highlighted noncompliance. Organizations outside Colombia funded some of these efforts. The bar owners’ association provided concerted education campaigns. Tobacco interests did not openly challenge implementation. Conclusions. Health organization monitoring, external funding, and hospitality industry support contributed to effective implementation, and could be cultivated in other low and middle income countries.

  16. Evaluation of the Higher Education Active Community Fund Project in Bournemouth

    OpenAIRE

    Apostolakis, Christos

    2005-01-01

    This report evaluates the Higher Education Active Community Fund (HEACF) Project from its first year in September 2002 to May 2005.The principle objective of the study was to evaluate the implementation of the HEACF project, its impact and its capacity to achieve the aims during this time. Based on research evidence the HEACF project introduced a holistic and systematic way of organising and developing volunteer activity at Bournemouth University. In addition to this, the project provided an ...

  17. Teacher Incentive Fund: First Implementation Report, 2006 and 2007 Grantees

    Science.gov (United States)

    Humphrey, Daniel C.; Gallagher, H. Alix; Yee, Kaily M.; Goss, G. Kyle; Campbell, Ashley Z.; Cassidy, Lauren J.; Mitchell, Nyema M.

    2012-01-01

    The Teacher Incentive Fund (TIF) supports projects that are designed to reform teacher and principal compensation. Initially, the Department of Education (the Department) made two rounds of awards, in 2006 and 2007, to a total of 34 grantees. The specific goals of TIF were to reward teachers and principals for improving student achievement,…

  18. LVIF announces eight more funded projects | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2018-04-05

    Apr 5, 2018 ... It brings vaccine researchers, manufacturers, and distributors together to achieve lasting impact. Read more about the newest projects being funded under the Livestock Vaccine Innovation Fund: Newcastle disease · Contagious caprine pleuropneumonia – Heartwater · CRISPR/cas9 gene editing platform ...

  19. Caltrans : transit funding manual : managing the delivery of transit projects

    Science.gov (United States)

    2001-05-01

    This manual attempts to provide a step by step transit funding process. Included in this manual : is an overview of Caltrans Division of Mass Transportation, roles and responsibilities in : assisting local agencies to deliver transit projects. Transi...

  20. SF Bay Water Quality Improvement Fund: Projects and Accomplishments

    Science.gov (United States)

    San Francisco Bay Water Quality Improvement Fund (SFBWQIF) projects listed here are part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  1. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    International Nuclear Information System (INIS)

    Shonder, John A.; Hughes, Patrick; Atkin, Erica

    2006-01-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  2. PERFORMANCE ANALYSIS OF PROJECTS IMPLEMENTATION IN HEIS

    Directory of Open Access Journals (Sweden)

    Sergiu-Vlad PETCU

    2015-04-01

    Full Text Available According to the European Commission, Romania is still facing significant mismatch between the skills of graduates of tertiary education and the market needs. This paper is highly relevant for the future implementation of HEIs, since they have a strong economic role and they can significantly influence long-term national social and economical development. Romania did not manage to materialize community funds allocated for the 2007-2013 programming period to its full potential. Accordingly, the proposed thesis intends to analyse how Romanian HEIs were able to manage community resources attracted by grants and how the implemented projects achieved their set objectives. According to the data collected so far, the results will show that the performance of the projects is directly dependent on the proportion of fully dedicated staff in organizational design of the project. The originality of the undertaken study is that it starts from a realistic approach, according to which the rules of the game should be adapted, depending on the players (in our case – HEIs.

  3. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    OpenAIRE

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  4. The Drawbacks of Project Funding for Epistemic Innovation: Comparing Institutional Affordances and Constraints of Different Types of Research Funding

    Science.gov (United States)

    Franssen, Thomas; Scholten, Wout; Hessels, Laurens K.; de Rijcke, Sarah

    2018-01-01

    Over the past decades, science funding shows a shift from recurrent block funding towards project funding mechanisms. However, our knowledge of how project funding arrangements influence the organizational and epistemic properties of research is limited. To study this relation, a bridge between science policy studies and science studies is…

  5. Challenges in Implementing FP7 Projects in the Public Institutions

    Directory of Open Access Journals (Sweden)

    Viorel VULTURESCU

    2012-06-01

    Full Text Available National Authority for Scientific Research (ANCS and Executive Unit for Higher Education, Research and Development and Innovation Funding (UEFISCDI participate to several projects funded under the Framework Programmes, since 1998. The staff from each the two organisations participating in projects are merely the same, typically from “international cooperation” departments. In each of the two organisations, dedicated teams were set and a distinct specialization emerged. In this respect, dedicated procedures and good practices in project management were developed. Even the Framework Programs had different structures and the focused was different (e.g. knowledge creation, EU problem solving, scientific support for policies and programs, etc., the funding instruments (projects were not radically different from a Framework Program to another, so the staff could gain experience in managing this type of projects. Experience and expertise gained during this long period of time led to definition of a general framework within the two institutions and setting up of a general guideline for participation to this type of projects. The main dimensions of this framework are: project team organization, project management process, managing results and risk, organisational framework, good practices, factors which ensure success in project implementation.The paper presents a specific framework for FP 7 project implementation and how this framework is applied by both organisations, a set of rules and procedures that should be followed by any organisation, in particular governmental ones, participating in FP 7 projects and a set of good practices developed by ANCS and UEFISCDI.

  6. PROJECT ABANDONMENT, CORRUPTION AND RECOVERY OF UNSPENT BUDGETED PUBLIC FUNDS IN NIGERIA

    Directory of Open Access Journals (Sweden)

    Richard INGWE

    2012-06-01

    Full Text Available Large amounts of unspent funds budgeted for implementing development projects have been recovered from Nigeria’s public officials since President Yar Adua directed in 2007 that responsible Nigerian Ministries, Departments and Agencies (MDAs must refund such funds at the end of every fiscal year. While unspent funds recovery represents some progress in the “war on corruption” entrenched by previous governments in the 1980s, the current policy limited by concentrating narrowly on recovery of financial resources thereby excluding accounting for other project resources (human skills application, time management or optimization among others that are usually applied to project implementation but lost through public officers’ failure and/or delays to implement planned projects. This article examines the magnitude of unspent funds recently recovered by the government from its various ministries, departments and agencies (MDAs. The general objective of this article is to contribute towards improving the development project management culture in Nigeria. The specific objectives are: To highlight the magnitude of unspent funds in Nigeria’s MDAs; and to show some adverse consequences of failing (or delaying to spend funds allocated in the budget forimplementing projects in economic sectors and on the pursuit of development objectives. Survey and description methods were used. Data on the refund of unspent funds was obtained from secondary sources (records of MDAs and analysed using qualitative and simple quantitative techniques. Results show that a high rate of projects delay and /or abandonment was discovered shortly after the inauguration of President Yar’ Adua and his administration in May 2007. Although some project funds have been recovered, other project resources (time wasted, human skills/hours and development benefits that would have accrued from completion of the planned and financed projects have not been recovered but lost. The fact

  7. Community Project Funding in Malawi under the Malawi Social ...

    African Journals Online (AJOL)

    This paper gives an overview of the kind of community development projects that the Malawi Social Action Fund (MASAF) has supported since its inception in July 1996. The MASAF has tended to subscribe to a demand-driven approach in its evaluation of projects, thereby introducing an element of competition in commu ...

  8. LVIF announces five more funded projects | CRDI - Centre de ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    10 avr. 2018 ... To date, 11 projects are being supported for a combined CA$13.6 million in research funding. The projects are driving innovation in livestock vaccines by accelerating the development of new vaccines and overcoming production challenges for existing vaccines. Collectively, these world-class research ...

  9. VERIFICATION PROCEDURE EUROPEAN FUNDED PROJECTS THROUGH FINANCIAL AUDITS

    Directory of Open Access Journals (Sweden)

    Riana Iren RADU

    2014-06-01

    Full Text Available The work developed by the authors assumes a definite need for reflection on funding mechanisms and macroeconomic management at all levels of budget deficit, amid the economic crisis unprecedented in the recent history of Romania and the whole of Europe. In this direction, this paper attempts to highlight issues that arise in terms of absorption of European funds for economic development based on this absorption emphasizing the role of grants in the economy and the need to audit projects.

  10. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  11. Crowdfunding: an innovative way to fund your project.

    Science.gov (United States)

    Walker, Dawn-Marie

    2017-06-22

    Background Getting research funded is extremely difficult, with research councils rejecting more than 70% of grant applications ( Else 2014 ). It is even more difficult if you are a junior researcher who doesn't have a track record of being awarded grant money or leading a research project. Crowdfunding may offer a solution. It is a method of raising funds from members of the public online and can offer an alternative to the more formal methods of research funding. Aim To outline how this model works and provide tips on designing a campaign. Discussion The authors provide an overview of the literature regarding this model, as well as a set of resources for future reference when designing a campaign. Conclusion Crowdfunding can provide small amounts of money for your first project. Implications for practice It is expected that clinicians practice evidence based medicine, and research in health environments is commonplace. Crowdfunding can offer you support in becoming more engaged in research.

  12. Financing and funding health care: Optimal policy and political implementability.

    Science.gov (United States)

    Nuscheler, Robert; Roeder, Kerstin

    2015-07-01

    Health care financing and funding are usually analyzed in isolation. This paper combines the corresponding strands of the literature and thereby advances our understanding of the important interaction between them. We investigate the impact of three modes of health care financing, namely, optimal income taxation, proportional income taxation, and insurance premiums, on optimal provider payment and on the political implementability of optimal policies under majority voting. Considering a standard multi-task agency framework we show that optimal health care policies will generally differ across financing regimes when the health authority has redistributive concerns. We show that health care financing also has a bearing on the political implementability of optimal health care policies. Our results demonstrate that an isolated analysis of (optimal) provider payment rests on very strong assumptions regarding both the financing of health care and the redistributive preferences of the health authority. Copyright © 2015 Elsevier B.V. All rights reserved.

  13. The carbon market: major operational carbon funds and financed projects

    International Nuclear Information System (INIS)

    Markandya, A.; Nobili, V.

    2008-01-01

    The flexible mechanisms envisaged by the Kyoto Protocol have led gradually to a global carbon market that has become very appetizing for companies operating in the sector. Financial instruments such as carbon funds, and investments in greenhouse-gas-reduction projects, now operate at the international level, counting on the development of new technologies and energy efficiency, and contributing to sustainable development in the countries that host the projects [it

  14. 42 CFR 86.16 - Use of project funds.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Use of project funds. 86.16 Section 86.16 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES GRANTS FOR EDUCATION PROGRAMS IN OCCUPATIONAL SAFETY AND HEALTH Occupational Safety and Health Training Grants § 86.16...

  15. Impact of externally funded projects on development of research ...

    African Journals Online (AJOL)

    Impact of externally funded projects on development of research capability of national agricultural research system. S K Sharma. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · AJOL African Journals Online. HOW TO USE AJOL.

  16. Research projects in family medicine funded by the European Union.

    Science.gov (United States)

    Pavličević, Ivančica; Barać, Lana

    2014-01-01

    This study aimed at synthesizing funding opportunities in the field of family medicine by determining the number of family medicine projects, as well as number of project leaderships and/ or participations by each country. This was done in order to encourage inclusion of physicians in countries with underdeveloped research networks in successful research networks or to encourage them to form new ones. We searched the Community Research and Development Information Service project database in February 2013. Study covered the period from years 1992 - 2012, selecting the projects within the field of general/family medicine. The search was conducted in February 2013. First search conducted in the CORDIS database came up with a total of 466 projects. After excluding 241 projects with insufficient data, we analysed 225 remaining projects; out of those, 22 (9.8%) were in the field of family medicine and 203 (90.2%) were from other fields of medicine. Sorted by the number of projects per country, Dutch institutions had the highest involvement in family medicine projects and were partners or coordinators in 18 out of 22 selected projects (81.8%), followed by British institutions with 15 (68.8%), and Spanish with 10 projects (45.5%). Croatia was a partner in a single FP7 Health project. Research projects in family medicine funded by the European Union show significant differences between countries. Constant and high-quality international cooperation in family medicine is the prerequisite for improvement and development of scientific research and the profession. Copyright © 2014 by Academy of Sciences and Arts of Bosnia and Herzegovina.

  17. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    Science.gov (United States)

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  18. 34 CFR 272.10 - What types of projects may be funded?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false What types of projects may be funded? 272.10 Section... Activities Does the Secretary Fund Under This Program? § 272.10 What types of projects may be funded? (a) The Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  19. PROJECT IMPLEMENTATION IN ORGANISATIONS OF REPETITIVE ACTIVITIES

    Directory of Open Access Journals (Sweden)

    Marek WIRKUS

    2015-04-01

    Full Text Available The study presents the implementation of projects in organisations that achieve business objectives through the imple-mentation of repetitive actions. Projects in these organisations are, on the one hand, treated as marginal activities, while the results of these projects have significant impact on the delivery of main processes, e.g. through the introduction of new products. Human capital and solutions in this field bear impact on the success of projects in these organisations, which is not always conducive to smooth implementation of projects. Conflict results from the nature of a project, which is a one-time and temporary process, so organisational solutions are also temporary. It influences on attitudes and com-mitment of the project contractors. The paper identifies and analyses factors which affect the success of the projects.

  20. Implementing Livestock Anaerobic Digestion Projects

    Science.gov (United States)

    Page provides information to help make an informed decision about installing an anaerobic digester. Is it a good match for a farm’s organic waste, project financing, development guidelines and permit requirements?

  1. MANAGEMENT ACCOUNTING IN EUROPEAN SOCIAL FUND FINANCED PROJECTS IN ROMANIA

    OpenAIRE

    Dogar Cristian; Tatiana Dãnescu

    2012-01-01

    Associating spent amounts in European Social Fund (ESF) financed interventions to eligible activities could be important premises for safeguarding the sound financial management principle. Incorporating management accounting in the beneficiaries accounting systems may provide primary warranties about compliance to the above mentioned principle as described in the EC Regulation 1605-2002 This study aims to explore some facts in actual accounting management implementation, as a base for future ...

  2. MANAGEMENT ACCOUNTING IN EUROPEAN SOCIAL FUND FINANCED PROJECTS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Dogar Cristian

    2012-12-01

    Full Text Available Associating spent amounts in European Social Fund (ESF financed interventions to eligible activities could be important premises for safeguarding the sound financial management principle. Incorporating management accounting in the beneficiaries accounting systems may provide primary warranties about compliance to the above mentioned principle as described in the EC Regulation 1605-2002 This study aims to explore some facts in actual accounting management implementation, as a base for future improvements of Romanian ESF beneficiary’s accounting systems ESF financed interventions covers a large range of labor market related services, delivered to the people to increase adaptability and occupational mobility with the aim of allowing or improving labor market access. Even if these services are diverse and delivered by various entities such as government agencies, enterprises or NGO’s, they do have something in common; they cannot generate incomes, but costs for implementing entities. But costs according to the sound financial management principle calls for tracing money with eligible activities using at least some if not all of management accounting concepts. Without some specifics from the donor or a mutual accepted best practice model, most of the ESF beneficiaries are reporting their efforts to actual researches and specialized literature regarding management accounting implementation in services delivering activities. This study was realized in March 2012 by applying an investigation instrument, an on-line questionnaire collecting both opinions and factual data as well to a number of 962 members of a practice community for ESF interventions implementation. This technique was used to test hypotheses regarding the premises for a future improvement of the existing accounting system model by incorporating management accounting. 130 members of this community answered anonymously, revealing an important concern for management accounting

  3. PROJECTS PORTOFOLIO FOR ECOLOGICAL RECONSTRUCTION OF THE IER VALLEZ AND THEIR FUNDING

    Directory of Open Access Journals (Sweden)

    Doru Ioan Ardelean

    2013-12-01

    Full Text Available The Ier Valley has been taken into the survey as it is drained by a polluted river and strongly affected by sewerages and inning, with the aim to establish ecological reabilitation measures. In this view, a SWOT analysis was carried out, which highlighted a number of weaknessess regarding the ecological status of the river, and in order to remove them, a portofolio of 14 environment projects was drawn. Their implementation would require over than 40 millions lei that means in a proportion of 91% other resources, especially European Funds. The environment investment projects were evaluated at a total economical value of about 40 millions lei. Their funding was conceived in partnership terms and accessing funds from several sources, mainly on short term.

  4. PRINCIPLES OF ASSESSING THE SOCIAL EFFECTS BY IMPLEMENTING INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Denis SIMOV

    2013-12-01

    Full Text Available Financial instruments are efficient – in terms of resource – mobilization of cohesion policy resources to achieve the objectives of the strategy. Rules of forming the investment strategy, particularly in State structures, by using the budget funds of the Republic of Moldova, must include as one of the criteria for project selection, the achieve of a positive social effect associated with its implementation.

  5. Experience of international projects implementation at Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Zavialov, L.A. [Leningrad Nuclear Power Plant ' Rosenergoatom' , Leningrad Region, 188540, Sosnovy Bor (Russian Federation)

    2008-07-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  6. Experience of international projects implementation at Leningrad Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zavialov, L.A.

    2008-01-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  7. The EU funded PARTNER project for ICTR-PHE 2012

    CERN Multimedia

    Greco, V

    2012-01-01

    PARTNER is a 4-­‐‑year Marie Curie Training project funded by the European Commission that aimed at the creation of the next generation of experts in hadron-­‐‑therapy. Ten academic institutes and research centres and two leading companies (Siemens and IBA) are participating in PARTNER, which is coordinated by CERN, forming a unique multidisciplinary and multinational European network.

  8. State write-ups on EERE funded projects

    Energy Technology Data Exchange (ETDEWEB)

    Hurwitch, J.; Klareich, F.; Surek, D.

    1997-03-04

    Short summaries are presented on 43 projects funded under the hydrogen program in FY 1997 in California, Colorado, Connecticut, the District of Columbia, Florida, Hawaii, Maryland, Massachusetts, Michigan, New Jersey, New Mexico, New York, Oklahoma, Pennsylvania, South Carolina, Tennessee, and Virginia. The studies involve hydrogen production processes, hydrogen storage and delivery systems, environmental impacts, hydrogen fuel cells, information dissemination, marketing research, separation processes, transportation safety, materials corrosion and stability, hydrogen recovery at refineries, and infrastructure planning.

  9. Financial auditing at enterprises for control of projects realized with credit fund-raising

    Science.gov (United States)

    Lukmanova, Inessa

    2017-10-01

    The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.

  10. Evaluation of implementation viability gap funding (VGF) policy on toll road investment in Indonesia

    Science.gov (United States)

    Mahani, Iris; Tamin, Rizal Z.; Pribadi, Krishna S.; Wibowo, Andreas

    2017-11-01

    VGF policy for toll road investment in Indonesia must be reviewed. Since 2012 the Government of Indonesia (GOI) has issued viability gap funding (VGF) policy for PPP infrastructure project through ministry of finance decision (PMK) No.223/2012. One of VGF purpose is to improve the financial feasibility. In the toll road investment in Indonesia, the implementation of this policy has some problems. This study aimed to evaluate the policy by seeking implementation constraints so can be given an alternative. This research was conducted qualitatively, included aspects of implementation process VGF policy. The analysis process is based on literature study and in-depth interviews to related parties include business entity, ministry of finance, and the ministry of public works, Indonesia Toll Road Authority (BPJT) and professional societies. The literature review conducted by reviewing existing policies and best practices in countries that already practice VGF. The conclusion of this study are 1) There is a conflict of regulation in viability gap funding (VGF) for toll road investment in Indonesia; 2) If Government of Indonesia (GOI) want implement construction grant as VGF, so the regulation must improve in time limited for submission and clearly define limited given in regulation; 3) If GOI want implement partial construction as VGF, so the regulation must be improve in guideline for submission and given.

  11. Beleaguered Egypt project running out of funds and time.

    Science.gov (United States)

    1992-01-01

    Started in 1979 as part of the International Planned Parenthood Federation (IPPF), the Family of the Future (FOF) social marketing project accounts for 35% of all contraceptives used in Egypt. FOF left the IPPF in 1981 to work as a nonprofit, semiprivate organization under the supervision of Egypt's Ministry of Health and has become the third largest social marketing project in the world. FOF has, however, gone through 5 executive directors in the last 6 years, prompting critics to think that the Board of Directors is hand-picked by the Egyptian Ministry of Health. additional allegations of financial mismanagement have caused the U.S. Agency for International Development (USAID) to cancel over $1.5 million in annual funding and product support for the program. Until recently, FOF has benefited from products and operations and technical assistance totalling near $20 million as part of a USAID 10-year, $118-million Egyptian effort. FOF has responded to the funding cut by downsizing its staff and preparing to raise contraceptive prices. Even though USAID has solicited proposals for competitive replacement programs, the new executive director is optimistic that funding cuts leading to organizational change and price increases will ultimately help FOF become self-sufficient. Once USAID-provided supplies have been depleted, FOF will most likely turn to IPPF for assistance.

  12. Classification of Implemented Foreign Assisted Projects into ...

    African Journals Online (AJOL)

    Classification of Implemented Foreign Assisted Projects into Sustainable And. Non-sustainable ... services or benefits is the most discriminating factor. Key Words: ..... Table 2: Relative discriminatory power of the variables equation (18).

  13. ENLIGHT and other EU-funded projects in hadron therapy

    CERN Document Server

    Dosanjh, M; Meyer, R

    2010-01-01

    Following impressive results from early phase trials in Japan and Germany, there is a current expansion in European hadron therapy. This article summarises present European Union-funded projects for research and co-ordination of hadron therapy across Europe. Our primary focus will be on the research questions associated with carbon ion treatment of cancer, but these considerations are also applicable to treatments using proton beams and other light ions. The challenges inherent in this new form of radiotherapy require maximum interdisciplinary co-ordination. On the basis of its successful track record in particle and accelerator physics, the internationally funded CERN laboratories (otherwise known as the European Organisation for Nuclear Research) have been instrumental in promoting collaborations for research purposes in this area of radiation oncology. There will soon be increased opportunities for referral of patients across Europe for hadron therapy. Oncologists should be aware of these developments, whi...

  14. Perspectives of joint implementation projects in Lithuania

    OpenAIRE

    Štreimikienė, Dalia; Mikalauskienė, Asta

    2004-01-01

    The paper deals with the perspectives of joint implementation (JI) projects in Lithuania. The analysis of flexible mechanisms under the Kyoto protocol including Jl benefits is presented in the paper. The main aim of the article is to analyze current macroeconomic environment which has impact on the JI perspectives in Lithuania and based on this analysis to define activities, measures and institutions necessary for the implementation of these projects. A very important issue in this context is...

  15. Research capacity building integrated into PHIT projects: leveraging research and research funding to build national capacity.

    Science.gov (United States)

    Hedt-Gauthier, Bethany L; Chilengi, Roma; Jackson, Elizabeth; Michel, Cathy; Napua, Manuel; Odhiambo, Jackline; Bawah, Ayaga

    2017-12-21

    Inadequate research capacity impedes the development of evidence-based health programming in sub-Saharan Africa. However, funding for research capacity building (RCB) is often insufficient and restricted, limiting institutions' ability to address current RCB needs. The Doris Duke Charitable Foundation's African Health Initiative (AHI) funded Population Health Implementation and Training (PHIT) partnership projects in five African countries (Ghana, Mozambique, Rwanda, Tanzania and Zambia) to implement health systems strengthening initiatives inclusive of RCB. Using Cooke's framework for RCB, RCB activity leaders from each country reported on RCB priorities, activities, program metrics, ongoing challenges and solutions. These were synthesized by the authorship team, identifying common challenges and lessons learned. For most countries, each of the RCB domains from Cooke's framework was a high priority. In about half of the countries, domain specific activities happened prior to PHIT. During PHIT, specific RCB activities varied across countries. However, all five countries used AHI funding to improve research administrative support and infrastructure, implement research trainings and support mentorship activities and research dissemination. While outcomes data were not systematically collected, countries reported holding 54 research trainings, forming 56 mentor-mentee relationships, training 201 individuals and awarding 22 PhD and Masters-level scholarships. Over the 5 years, 116 manuscripts were developed. Of the 59 manuscripts published in peer-reviewed journals, 29 had national first authors and 18 had national senior authors. Trainees participated in 99 conferences and projects held 37 forums with policy makers to facilitate research translation into policy. All five PHIT projects strongly reported an increase in RCB activities and commended the Doris Duke Charitable Foundation for prioritizing RCB, funding RCB at adequate levels and time frames and for allowing

  16. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Directory of Open Access Journals (Sweden)

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  17. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  18. The EU-funded EuropeanaTravel project

    Directory of Open Access Journals (Sweden)

    Paul Ayris

    2009-10-01

    Full Text Available EuropeanaTravel is a targeted project for cultural content in the target area digital libraries of the eContentplus 2008 Work Programme funded by the European Commission. Its overall objective is to digitise content on the theme of travel and tourism for use in Europeana as requested by the EDL Foundation. The themed content will come from the wonderful collections of major university libraries and national libraries. The project is supported by CENL and LIBER, two founder members of the EDL Foundation, and by the Foundation itself. A secondary objective of the project is further to strengthen collaboration between CENL and LIBER by extending their experience of joint working, thus increasing human interoperability in support of Europeana. Other objectives include creating a LIBER closed access aggregation service to aggregate material from LIBER members for Europeana, continuing to mobilise support for Europeana amongst university libraries in a systematic way, and supporting the spread of best practice in digitisation by libraries. The consortium’s 19 members include 17 library members providing content from 16 countries drawn roughly equally from the membership of CENL and LIBER and from all European regions. The project will run for two years and work closely and flexibly with the Europeana team. The EuropeanaTravel project was launched in Tallinn on 11 May 2009 and this article has been compiled to celebrate that event.

  19. Leaders' experiences and perceptions implementing activity-based funding and pay-for-performance hospital funding models: A systematic review.

    Science.gov (United States)

    Baxter, Pamela E; Hewko, Sarah J; Pfaff, Kathryn A; Cleghorn, Laura; Cunningham, Barbara J; Elston, Dawn; Cummings, Greta G

    2015-08-01

    Providing cost-effective, accessible, high quality patient care is a challenge to governments and health care delivery systems across the globe. In response to this challenge, two types of hospital funding models have been widely implemented: (1) activity-based funding (ABF) and (2) pay-for-performance (P4P). Although health care leaders play a critical role in the implementation of these funding models, to date their perspectives have not been systematically examined. The purpose of this systematic review was to gain a better understanding of the experiences of health care leaders implementing hospital funding reforms within Organisation for Economic Cooperation and Development countries. We searched literature from 1982 to 2013 using: Medline, EMBASE, CINAHL, Academic Search Complete, Academic Search Elite, and Business Source Complete. Two independent reviewers screened titles, abstracts and full texts using predefined criteria. We included 2 mixed methods and 12 qualitative studies. Thematic analysis was used in synthesizing results. Five common themes and multiple subthemes emerged. Themes include: pre-requisites for success, perceived benefits, barriers/challenges, unintended consequences, and leader recommendations. Irrespective of which type of hospital funding reform was implemented, health care leaders described a complex process requiring the following: organizational commitment; adequate infrastructure; human, financial and information technology resources; change champions and a personal commitment to quality care. Crown Copyright © 2015. Published by Elsevier Ireland Ltd. All rights reserved.

  20. Building local human resources to implement SLMTA with limited donor funding: The Ghana experience.

    Science.gov (United States)

    Nkrumah, Bernard; van der Puije, Beatrice; Bekoe, Veronica; Adukpo, Rowland; Kotey, Nii A; Yao, Katy; Fonjungo, Peter N; Luman, Elizabeth T; Duh, Samuel; Njukeng, Patrick A; Addo, Nii A; Khan, Fazle N; Woodfill, Celia J I

    2014-11-03

    In 2009, Ghana adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme in order to improve laboratory quality. The programme was implemented successfully with limited donor funding and local human resources. To demonstrate how Ghana, which received very limited PEPFAR funding, was able to achieve marked quality improvement using local human resources. Local partners led the SLMTA implementation and local mentors were embedded in each laboratory. An in-country training-of-trainers workshop was conducted in order to increase the pool of local SLMTA implementers. Three laboratory cohorts were enrolled in SLMTA in 2011, 2012 and 2013. Participants from each cohort attended in a series of three workshops interspersed with improvement projects and mentorship. Supplemental training on internal audit was provided. Baseline, exit and follow-up audits were conducted using the Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist. In November 2013, four laboratories underwent official SLIPTA audits by the African Society for Laboratory Medicine (ASLM). The local SLMTA team successfully implemented three cohorts of SLMTA in 15 laboratories. Seven out of the nine laboratories that underwent follow-up audits have reached at least one star. Three out of the four laboratories that underwent official ASLM audits were awarded four stars. Patient satisfaction increased from 25% to 70% and sample rejection rates decreased from 32% to 10%. On average, $40 000 was spent per laboratory to cover mentors' salaries, SLMTA training and improvement project support. Building in-country capacity through local partners is a sustainable model for improving service quality in resource-constrained countries such as Ghana. Such models promote country ownership, capacity building and the use of local human resources for the expansion of SLMTA.

  1. Building local human resources to implement SLMTA with limited donor funding: The Ghana experience

    Directory of Open Access Journals (Sweden)

    Bernard Nkrumah

    2014-11-01

    Full Text Available Background: In 2009, Ghana adopted the Strengthening Laboratory Management Toward Accreditation (SLMTA programme in order to improve laboratory quality. The programme was implemented successfully with limited donor funding and local human resources. Objectives: To demonstrate how Ghana, which received very limited PEPFAR funding, was able to achieve marked quality improvement using local human resources. Method: Local partners led the SLMTA implementation and local mentors were embedded in each laboratory. An in-country training-of-trainers workshop was conducted in order to increase the pool of local SLMTA implementers. Three laboratory cohorts were enrolled in SLMTA in 2011, 2012 and 2013. Participants from each cohort attended in a series of three workshops interspersed with improvement projects and mentorship. Supplemental trainingon internal audit was provided. Baseline, exit and follow-up audits were conducted using the Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA checklist. In November 2013, four laboratories underwent official SLIPTA audits by the African Society for Laboratory Medicine (ASLM. Results: The local SLMTA team successfully implemented three cohorts of SLMTA in 15 laboratories. Seven out of the nine laboratories that underwent follow-up audits have reached at least one star. Three out of the four laboratories that underwent official ASLM audits were awarded four stars. Patient satisfaction increased from 25% to 70% and sample rejection rates decreased from 32% to 10%. On average, $40 000 was spent per laboratory to cover mentors’salaries, SLMTA training and improvement project support. Conclusion: Building in-country capacity through local partners is a sustainable model for improving service quality in resource-constrained countries such as Ghana. Such modelspromote country ownership, capacity building and the use of local human resources for the expansion of SLMTA.

  2. Sustainability of donor-funded rural water supply and sanitation projects in Mbire district, Zimbabwe

    Science.gov (United States)

    Kwangware, Johnson; Mayo, Aloyce; Hoko, Zvikomborero

    The sustainability of donor-funded rural water supply and sanitation projects was assessed in Mbire district, Zimbabwe in terms of level of community participation, quality of implementation and reliability of the systems. The study was carried out through questionnaires, focus group discussions, interviews and field observations. The results show that the quality of implementation of the projects was deemed to be good and participation of the communities in project ideas initiation and choice of technology was found to be very low. Reliability of the systems was found to be very high with 97% of the boreholes in all the three wards studied being functional. Financial management mechanisms were very poor because water consumers were not willing to pay for operation and maintenance. The projects were classified as potentially sustainable with sustainability index between 5.00 and 6.67. Poor financial management mechanisms for effective borehole maintenance, poor quality of construction and lack of community participation in project planning were found to be potential threats to the sustainability of the projects. Future projects should establish the need for the service and should thus be demand driven to ensure effective participation of the water consumers and enhance project's potential for sustainability.

  3. [Overview of research projects funding in traditional Chinese medicine oncology field supported by National Natural Science Foundation of China].

    Science.gov (United States)

    Tang, Dong-Xin; Chen, Lian-Yu; Guo, Shu-Zhen; Han, Li-Wei; Zhang, Feng-Zhu

    2017-05-01

    In this paper, the funding situation of traditional Chinese medicine oncology research projects supported by National Natural Science Fund from 1986-2016 was reviewed. The characteristics of funded projects were summarized from funding amount, funding expenses, funding category, and the main research contents of projects, etc. At the same time, the main problems in the projects were analyzed in this paper, in order to provide reference for the relevant fund applicants. Copyright© by the Chinese Pharmaceutical Association.

  4. Geothermal projects funded under the NER 300 programme - current state of development and knowledge gained

    Science.gov (United States)

    Shortall, Ruth; Uihlein, Andreas

    2017-04-01

    Introduction The NER 300 programme, managed by the European Commission is one of the largest funding programmes for innovative low-carbon energy demonstration projects. NER 300 is so called because it is funded from the sale of 300 million emission allowances from the new entrants' reserve (NER) set up for the third phase of the EU emissions trading system (ETS). The programme aims to successfully demonstrate environmentally safe carbon capture and storage (CCS) and innovative renewable energy (RES) technologies on a commercial scale with a view to scaling up production of low-carbon technologies in the EU. Consequently, it supports a wide range of CCS and RES technologies (bioenergy, concentrated solar power, photovoltaics, geothermal, wind, ocean, hydropower, and smart grids). Funded projects and the role of geothermal projects for the programme In total, about EUR 2.1 billion have been awarded through the programme's 2 calls for proposals (the first awarded in December 2012, the second in July 2014). The programme has awarded around EUR 70 million funding to 3 geothermal projects in Hungary, Croatia and France. The Croatian geothermal project will enter into operation during 2017 the Hungarian in 2018, and the French in 2020. Knowledge Sharing Knowledge sharing requirements are built into the legal basis of the programme as a critical tool to lower risks in bridging the transition to large-scale production of innovative renewable energy and CCS deployment. Projects have to submit annually to the European Commission relevant knowledge gained during that year in the implementation of their project. The relevant knowledge is aggregated and disseminated by the European Commission to industry, research, government, NGO and other interest groups and associations in order to provide a better understanding of the practical challenges that arise in the important step of scaling up technologies and operating them at commercial scale. The knowledge sharing of the NER 300

  5. 34 CFR 200.86 - Use of MEP funds in schoolwide projects.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Use of MEP funds in schoolwide projects. 200.86 Section... SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED Migrant Education Program § 200.86 Use of MEP funds in schoolwide projects. Funds available under part C...

  6. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    Science.gov (United States)

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural

  7. 30 CFR 880.13 - Project implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project implementation. 880.13 Section 880.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... on Indian lands under the jurisdiction of tribes not having approved AML reclamation plans and on...

  8. Data collected on TPAD implementation projects.

    Science.gov (United States)

    2014-11-01

    TPAD testing was conducted by CTR personnel at the following locations during TxDOT Project : 5-6005-01: Statewide Implementation of Total Pavement Acceptance Device (TPAD) (January : 2013 through August 2014): : (1) San Marcos Airport, : (2) IH 10 i...

  9. The importance of a project level risk management methodology for EU Structural and Investment Funds accession in Romania

    Directory of Open Access Journals (Sweden)

    Nicolae Ciprian

    2017-07-01

    Full Text Available Accessing EU funds is considered to be an important development chance for all type of beneficiaries in Romania: public bodies, nongovernmental organizations and firms. The grounds for this are the amount of funds available per beneficiary and the co financing rate (for example, the investment projects for firms amounted up to 5 million Euro of EU funding at a EU co financing rate up to 70%. As the Romanian responsible authorities strive to conduct a fast and smooth process, the reality shows the funds accession is rather unpredictable and costly, both in terms of time consumption and financial resources. Lots of causes contribute to this situation, amongst which the inefficient risk management conducted, both by the state authorities responsible with the EU funds management and by the beneficiaries of funds. The effects are visible: a poor absorption rate of the EU structural and cohesion funds (79,23% at the level of January 2017 for the 2007-2013 financial period. The authors' research follows the importance that risk management should have in the process of managing and accessing EU funds. The research methodology starts from the responses that 170 people involved in managing EU funded projects within 2007-2013 financial period gave to an online questionnaire carried on in 2016. The focus was to establish if and how risk management methodologies/procedures/guidelines were used within the implementation of projects and in what measure this kind of approach should be compulsory or optional for the financial period 2014-2020. The research methodology further implied the analysis of key issues for projects financing such as: feasibility and opportunity determination, budgeting, projects' evaluation, etc. The main finding of the research is that applicants and beneficiaries need to implement project level risk management methodologies. Based on this, the authors propose a guideline for drafting project level risk management methodologies, that

  10. Assessment of Contributions to Patient Safety Knowledge by the Agency for Healthcare Research and Quality-Funded Patient Safety Projects

    Science.gov (United States)

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-01-01

    Objective To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)' patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Data Sources Information abstracted from proposals for projects funded in AHRQ' patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. Study Design This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. Principal Findings The 234 projects funded through AHRQ' patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. Conclusions The projects funded in AHRQ' patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results. PMID:21456108

  11. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  12. 23 CFR 661.43 - Can other sources of funds be used to finance a queued project in advance of receipt of IRRBP funds?

    Science.gov (United States)

    2010-04-01

    ... PROGRAM § 661.43 Can other sources of funds be used to finance a queued project in advance of receipt of... project that has been approved for funding and placed on the queue and then be reimbursed when IRRBP funds... 23 Highways 1 2010-04-01 2010-04-01 false Can other sources of funds be used to finance a queued...

  13. Qualitative analysis of the dynamics of policy design and implementation in hospital funding reform.

    Directory of Open Access Journals (Sweden)

    Karen S Palmer

    Full Text Available As in many health care systems, some Canadian jurisdictions have begun shifting away from global hospital budgets. Payment for episodes of care has begun to be implemented. Starting in 2012, the Province of Ontario implemented hospital funding reforms comprising three elements: Global Budgets; Health Based Allocation Method (HBAM; and Quality-Based Procedures (QBP. This evaluation focuses on implementation of QBPs, a procedure/diagnosis-specific funding approach involving a pre-set price per episode of care coupled with best practice clinical pathways. We examined whether or not there was consensus in understanding of the program theory underpinning QBPs and how this may have influenced full and effective implementation of this innovative funding model.We undertook a formative evaluation of QBP implementation. We used an embedded case study method and in-depth, one-on-one, semi-structured, telephone interviews with key informants at three levels of the health care system: Designers (those who designed the QBP policy; Adoption Supporters (organizations and individuals supporting adoption of QBPs; and Hospital Implementers (those responsible for QBP implementation in hospitals. Thematic analysis involved an inductive approach, incorporating Framework analysis to generate descriptive and explanatory themes that emerged from the data.Five main findings emerged from our research: (1 Unbeknownst to most key informants, there was neither consistency nor clarity over time among QBP designers in their understanding of the original goal(s for hospital funding reform; (2 Prior to implementation, the intended hospital funding mechanism transitioned from ABF to QBPs, but most key informants were either unaware of the transition or believe it was intentional; (3 Perception of the primary goal(s of the policy reform continues to vary within and across all levels of key informants; (4 Four years into implementation, the QBP funding mechanism remains

  14. Qualitative analysis of the dynamics of policy design and implementation in hospital funding reform.

    Science.gov (United States)

    Palmer, Karen S; Brown, Adalsteinn D; Evans, Jenna M; Marani, Husayn; Russell, Kirstie K; Martin, Danielle; Ivers, Noah M

    2018-01-01

    As in many health care systems, some Canadian jurisdictions have begun shifting away from global hospital budgets. Payment for episodes of care has begun to be implemented. Starting in 2012, the Province of Ontario implemented hospital funding reforms comprising three elements: Global Budgets; Health Based Allocation Method (HBAM); and Quality-Based Procedures (QBP). This evaluation focuses on implementation of QBPs, a procedure/diagnosis-specific funding approach involving a pre-set price per episode of care coupled with best practice clinical pathways. We examined whether or not there was consensus in understanding of the program theory underpinning QBPs and how this may have influenced full and effective implementation of this innovative funding model. We undertook a formative evaluation of QBP implementation. We used an embedded case study method and in-depth, one-on-one, semi-structured, telephone interviews with key informants at three levels of the health care system: Designers (those who designed the QBP policy); Adoption Supporters (organizations and individuals supporting adoption of QBPs); and Hospital Implementers (those responsible for QBP implementation in hospitals). Thematic analysis involved an inductive approach, incorporating Framework analysis to generate descriptive and explanatory themes that emerged from the data. Five main findings emerged from our research: (1) Unbeknownst to most key informants, there was neither consistency nor clarity over time among QBP designers in their understanding of the original goal(s) for hospital funding reform; (2) Prior to implementation, the intended hospital funding mechanism transitioned from ABF to QBPs, but most key informants were either unaware of the transition or believe it was intentional; (3) Perception of the primary goal(s) of the policy reform continues to vary within and across all levels of key informants; (4) Four years into implementation, the QBP funding mechanism remains misunderstood; and

  15. 45 CFR 2551.92 - What are project funding requirements?

    Science.gov (United States)

    2010-10-01

    ... local funding sources during the first three years of operations; or (2) An economic downturn, the... sources of local funding support; or (3) The unexpected discontinuation of local support from one or more... local funding sources during the first three years of operations; (ii) An economic downturn, the...

  16. 45 CFR 2552.92 - What are project funding requirements?

    Science.gov (United States)

    2010-10-01

    ... local funding sources during the first three years of operations; or (2) An economic downturn, the... sources of local funding support; or (3) The unexpected discontinuation of local support from one or more... the development of local funding sources during the first three years of operations; or (ii) An...

  17. Economics, funding and the influence of politics on the UMTRA Project

    International Nuclear Information System (INIS)

    Hamp, S.

    1993-01-01

    This presentation discusses the factors contributing to the cost of the Uranium Mill Tailings Remediation Action Project and the political process involved in the funding. Topics covered include the following: Funding estimate and growth of estimate; Management actions during process; how the political process worked; cost of completed sites; economic benefit analysis of the project to Colorado; cost reduction program for the UMTRA project

  18. 34 CFR 271.10 - What types of projects may be funded?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false What types of projects may be funded? 271.10 Section... Activities Does the Secretary Assist Under This Program? § 271.10 What types of projects may be funded? The Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  19. 34 CFR 429.10 - What types of projects may be funded?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What types of projects may be funded? 429.10 Section... of projects may be funded? The Secretary provides assistance through grants, contracts, or... instructional and curriculum materials, methods, or techniques; (c) Training projects to familiarize State...

  20. Influence to the financial situation of hospitals for projects financed from the EU structural funds

    Directory of Open Access Journals (Sweden)

    Aleksandra ŁĘGA

    2015-05-01

    Full Text Available The European Union gives many opportunities for development to member countries, including raising founds for its funds. This money could be sought in many sectors of the economy. One of them is health care. The goal of this study is to assess the impact of the financial situation of hospitals in the Kuyavian-Pomeranian for projects financed by the Structural Funds European Union (EU in programming period 2007-2013. The money from the European Regional Development Fund and European Social Fund provided an opportunity to introduce the latest technology and equipment in medical entities, as well as allowed skilled in the art. Of medicine to acquire knowledge and skills to develop their potential. The paper discusses issues related to the possibilities of support by EU funding to health care. Based on the data contained in the financial statements of an analysis of data from the balance sheet, characterized projects in hospitals as part of financing from the EU and the influence of the material in the therapeutic entities for their implementation through the analyses of correlation. The possibility of providing health services requires appropriate  regulations in law, system and organization. This is necessary in order to achieve the main goal of any entity that is take care of the welfare of the patient. Health and its protection is the highest value for the individual and for society, so Poland and the European Union is committed to the protection of the priority objective through enhanced organizational and legal actions and investments in the health sector.

  1. Implementation of the model project: Ghanaian experience

    International Nuclear Information System (INIS)

    Schandorf, C.; Darko, E.O.; Yeboah, J.; Asiamah, S.D.

    2003-01-01

    Upgrading of the legal infrastructure has been the most time consuming and frustrating part of the implementation of the Model project due to the unstable system of governance and rule of law coupled with the low priority given to legislation on technical areas such as safe applications of Nuclear Science and Technology in medicine, industry, research and teaching. Dwindling Governmental financial support militated against physical and human resource infrastructure development and operational effectiveness. The trend over the last five years has been to strengthen the revenue generation base of the Radiation Protection Institute through good management practices to ensure a cost effective use of the limited available resources for a self-reliant and sustainable radiation and waste safety programme. The Ghanaian experience regarding the positive and negative aspects of the implementation of the Model Project is highlighted. (author)

  2. Development and implementation of the Qatargas project

    International Nuclear Information System (INIS)

    Abdulrahman, A.

    1997-01-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs

  3. Development and implementation of the Qatargas project

    Energy Technology Data Exchange (ETDEWEB)

    Abdulrahman, A [Qatar Liquefied Gas Company Ltd., Doha (Qatar)

    1997-06-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs.

  4. 75 FR 4769 - Availability of Grant Funds and Proposed Implementation Guidelines; Withdrawal of Solicitation...

    Science.gov (United States)

    2010-01-29

    ..., 2010, the National Oceanic and Atmospheric Administration published its annual notice entitled... Atmospheric Administration Availability of Grant Funds and Proposed Implementation Guidelines; Withdrawal of Solicitation for the Marine Aquaculture Initiative AGENCY: National Oceanic and Atmospheric Administration...

  5. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  6. Mass Transit: Implementation of FTA's New Starts Evaluation Process and FY 2001 Funding Proposals

    National Research Council Canada - National Science Library

    2000-01-01

    .... Much of this investment has come through the Federal Transit Administration's (FTA) New Starts program, which helps pay for certain rail, bus, and trolley projects through full funding grant agreements...

  7. The Impact of Dwindling Donor Funding on HIV and AIDS Projects in ...

    African Journals Online (AJOL)

    This study seeks to investigate the impact of dwindling donor funding on HIV and AIDS projects in Sub-Saharan Africa. The study surveyed literature on the effects of diminishing donor funding on people living with HIV and AIDS in Sub-Saharan Africa. Factors associated with reduced donor funding identified in this study ...

  8. 24 CFR 200.54 - Project completion funding.

    Science.gov (United States)

    2010-04-01

    ... Endorsement Generally Applicable to Multifamily and Health Care Facility Mortgage Insurance Programs; and...-income housing tax credit syndication proceeds, historic tax credit syndication proceeds, or funds...

  9. State Revolving Funds: Financing Drought Resilient Water Infrastructure Projects

    Science.gov (United States)

    This report highlights innovative funding policies and programmatic actions that states are using to support drought resilient investment and operations through incentives, state requirements, and technical assistance.

  10. The French Muskoka Fund: origin, objectives, and implementation.

    Science.gov (United States)

    Aboubaker, S; Grimaldi, C

    2016-11-01

    Through its Priority Solidarity Fund, France set up a partnership with four United Nations agencies, WHO, UNICEF, UNFPA, and UN WOMEN for the years 2011-2015 with an annual budget of 19 M €. An additional sixth year supplementary is underway. The program was developed through a common framework of actions coordinated and harmonized at the level of the target countries: integrated management of childhood diseases, mother-child nutrition, prenatal, perinatal, and postpartum follow-up, sexual and reproductive health, and adolescent health. The contribution of WHO was based on its normative role; UNICEF offered its operational capacity in the field, and UNFPA its focus on reproductive health, while UN WOMEN dealt with gender questions. The countries targeted specifically were: Benin, Burkina Faso, Côte d'Ivoire, Guinea, Haiti, Mali, Nigeria, Central Africa Republic, Democratic Republic of the Congo, Senegal, Chad, and Togo.

  11. International funding opportunities for ideas of collaboration projects in OOHP

    Directory of Open Access Journals (Sweden)

    Ilin, Corina

    2012-04-01

    Full Text Available The present paper is presenting the exploratory workshop organized by the OOHP Master team in December 2011, which opened paths for theoretical knowledge and for collaboration with researchers having international prestige. Also, the paper presents funding opportunities available in national grants, and the strategy chosen by the team to prepare a two-step access to funds.

  12. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  13. 75 FR 5765 - NOAA Coastal and Marine Habitat Restoration Project Supplemental Funding

    Science.gov (United States)

    2010-02-04

    ...-02] RIN 0648-ZC05 NOAA Coastal and Marine Habitat Restoration Project Supplemental Funding AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of supplemental funding for NOAA Coastal and Marine Habitat Restoration Projects. SUMMARY...

  14. 34 CFR 222.192 - What local funds may be considered as available for this project?

    Science.gov (United States)

    2010-07-01

    ... § 222.192 What local funds may be considered as available for this project? To determine the amount of... 34 Education 1 2010-07-01 2010-07-01 false What local funds may be considered as available for this project? 222.192 Section 222.192 Education Regulations of the Offices of the Department of...

  15. Implications of Project-Based Funding of Research on Budgeting and Financial Management in Public Universities

    Science.gov (United States)

    Raudla, Ringa; Karo, Erkki; Valdmaa, Kaija; Kattel, Rainer

    2015-01-01

    The main goal of the paper is to explore--both theoretically and empirically--the implications of project-based research funding for budgeting and financial management at public universities. The theoretical contribution of the paper is to provide a synthesized discussion of the possible impacts of project-based funding on university financial…

  16. Implementing Climate Services in Peru: CLIMANDES Project

    Science.gov (United States)

    Lavado-Casimiro, Waldo; Mauchle, Fabian; Diaz, Amelia; Seiz, Gabriela; Rubli, Alex; Rossa, Andrea; Rosas, Gabriela; Ita, Niceforo; Calle, Victoria; Villegas, Esequiel; Ambrosetti, Paolo; Brönnimann, Stefan; Hunziker, Stefan; Jacques, Martin; Croci-Maspoli, Mischa; Konzelmann, Thomas; Gubler, Stefanie; Rohrer, Mario

    2014-05-01

    The climate variability and change will have increasing influence on the economic and social development of all countries and regions, such as the Andes in Latin America. The CLIMANDES project (Climate services to support decision-making in the Andean Region) will address these issues in Peru. CLIMANDES supports the WMO Regional Training Centre (RTC) in Lima, which is responsible for the training of specialized human resources in meteorology and climatology in the South American Andes (Module 1). Furthermore, CLIMANDES will provide high-quality climate services to inform policy makers in the Andean region (Module 2). It is coordinated by the World Meteorological Organization (WMO) and constitutes a pilot project under the umbrella of the WMO-led Global Framework for Climate Services (GFCS). The project is funded by the Swiss Agency for Development and Cooperation (SDC) and runs from August 2012 - July 2015. Module 1 focuses on restructuring the curricula of Meteorology at the La Molina Agraria University (UNALM) and applied training of meteorologists of the Peruvian National Service of Meteorology and Hydrology (SENAMHI). In Module 2, the skills will be shared and developed in the production and delivery of high-quality climate products and services tailored to the needs of the decision makers in the pilot regions Cusco and Junín. Such services will benefit numerous sectors including agriculture, education, health, tourism, energy, transport and others. The goals of the modules 1 and 2 will be achieved through the collaboration of the UNALM, SENAMHI and the Federal Office of Meteorology and Climatology MeteoSwiss, with the support of the University of Bern (UNIBE), Meteodat and WMO.

  17. Implementation of the Hungarian RW management project: Results and lessons

    International Nuclear Information System (INIS)

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-01-01

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding

  18. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  19. Funding Water Reuse and Conservation Projects with the Clean Water State Revolving Fund

    Science.gov (United States)

    This fact sheet demonstrates how the CWSRF provides assistance to eligible recipients for projects promoting water reuse and conservation. It highlights successful projects for these communities in California, Virginia and Texas.

  20. Using real options to determine optimal funding strategies for CO2 capture, transport and storage projects in the European Union

    International Nuclear Information System (INIS)

    Eckhause, Jeremy; Herold, Johannes

    2014-01-01

    Several projects in the European Union (EU) are currently under development to implement the carbon capture, transport and storage (CCS) technology on a large scale and may be subject to public funding under EU support initiatives. These CCS projects may develop any combination of three types of operating levels: pilot, demonstration and full-scale, representing progressing levels of electric power generation capability. Several projects have commenced at the demonstration level, with full-scale commercial levels planned for approximately 2020. Taking the perspective of a funding agency, we employ a real options framework for determining an optimal project selection and funding strategy for the development of full-scale CCS plants. Specifically, we formulate and solve a stochastic dynamic program (SDP) for obtaining optimal funding solutions in order to achieve at least one successfully operating full-scale CCS plant by a target year. The model demonstrates the improved risk reduction by employing such a multi-stage competition. We then extend the model to consider two sensitivities: (1) the flexibility to spend that budget among the time periods and (2) optimizing the budget, but specifying each time period's allocation a priori. State size and runtimes of the SDP model are provided. - Highlights: • Projects implementing three different CCS technology types are described. • We obtain projects’ transition probabilities and costs from expert interviews. • We use a multi-stage real options model to obtain optimal funding strategies. • Using this approach, actual decision-makers could reduce risks in CCS development

  1. Opportunities for AFRA NC implementing Projects

    International Nuclear Information System (INIS)

    2017-01-01

    Some of the AFRA Objectives are to Establish common understanding that all networks operate under the AFRA framework as an African single intergovernmental body Align these networks with the common objectives of AFRA for strengthening activities and to define the modalities for collaboration within AFRA MSs. Some of the achievements in 2016 are: Under RAF/0/038 “Promoting Technical Cooperation among Developing Countries (TCDC) in Africa through Triangular Partnerships”, adequate support was provided to facilitate the implementation of several joint project proposals submitted by Member States in various fields of activity including NDT, Radiation processing, and Education and Training in nuclear science and technology. Under RAF0041: “Sharing Best Practices in Preventive Maintenance of Nuclear Equipment”, support was provided to Member States at the Seibersdorf Laboratory to improve the maintenance of medical and scientific instrumentation through capacity development for repair services, preventive maintenance, and cost recovery through income generated from the provision of services

  2. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  3. Analysis of agency relationships in the design and implementation process of the equity fund in Madagascar.

    Science.gov (United States)

    Honda, Ayako

    2015-02-04

    There are large gaps in the literature relating to the implementation of user fee policy and fee exemption measures for the poor, particularly on how such schemes are implemented and why many have not produced expected outcomes. In October 2003, Madagascar instituted a user fee exemption policy which established "equity funds" at public health centres, and used medicine sales revenue to subsidise the cost of medicine for the poor. This study examines the policy design and implementation process of the equity fund in Madagascar in an attempt to explore factors influencing the poor equity outcomes of the scheme. This study applied an agency-incentive framework to investigate the equity fund policy design and implementation practices. It analysed agency relationships established during implementation; examined incentive structures given to the agency relationships in the policy design; and considered how incentive structures were shaped and how agents responded in practice. The study employed a case-study approach with in-depth analysis of three equity fund cases in Madagascar's Boeny region. Policy design problems, triggering implementation problems, caused poor equity performance. These problems were compounded by the re-direction of policy objectives by health administrators and strong involvement of the administrators in the implementation of policy. The source of the policy design and implementation failure was identified as a set of principal-agent problems concerning: monitoring mechanisms; facility-based fund management; and the nature and level of community participation. These factors all contributed to the financial performance of the fund receiving greater attention than its ability to financially protect the poor. The ability of exemption policies to protect the poor from user fees can be found in the details of the policy design and implementation; and implications of the policy design and implementation in a specific context determine whether a policy

  4. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. A bank-fund projection framework with CGE features

    DEFF Research Database (Denmark)

    Jensen, Henning Tarp; Tarp, Finn

    2006-01-01

    In this paper, we present a SAM-based methodology for integrating standard CGE features with a macroeconomic World Bank–International Monetary Fund (IMF) modelling framework. The resulting macro–micro framework is based on optimising agents, but it retains key features from the macroeconomic model...

  6. A Standard Bank-Fund Projection Framework with CGE Features

    DEFF Research Database (Denmark)

    Jensen, Henning Tarp; Tarp, Finn

    2006-01-01

    In this paper, we present a SAM-based methodology for integrating standard CGE features with a macroeconomic World Bank–International Monetary Fund (IMF) modelling framework. The resulting macro–micro framework is based on optimising agents, but it retains key features from the macroeconomic model...

  7. Asia Research News features IDRC-funded projects | CRDI - Centre ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    18 juin 2014 ... From combating chronic malnutrition to improving health care for women, exploring the causes of violence in cities, or understanding the needs of small and medium enterprises, the 2014 edition of Asia Research News provides a snapshot of IDRC-funded research in Asia.

  8. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  9. The current state of funded NIH grants in implementation science in genomic medicine: a portfolio analysis.

    Science.gov (United States)

    Roberts, Megan C; Clyne, Mindy; Kennedy, Amy E; Chambers, David A; Khoury, Muin J

    2017-10-26

    PurposeImplementation science offers methods to evaluate the translation of genomic medicine research into practice. The extent to which the National Institutes of Health (NIH) human genomics grant portfolio includes implementation science is unknown. This brief report's objective is to describe recently funded implementation science studies in genomic medicine in the NIH grant portfolio, and identify remaining gaps.MethodsWe identified investigator-initiated NIH research grants on implementation science in genomic medicine (funding initiated 2012-2016). A codebook was adapted from the literature, three authors coded grants, and descriptive statistics were calculated for each code.ResultsForty-two grants fit the inclusion criteria (~1.75% of investigator-initiated genomics grants). The majority of included grants proposed qualitative and/or quantitative methods with cross-sectional study designs, and described clinical settings and primarily white, non-Hispanic study populations. Most grants were in oncology and examined genetic testing for risk assessment. Finally, grants lacked the use of implementation science frameworks, and most examined uptake of genomic medicine and/or assessed patient-centeredness.ConclusionWe identified large gaps in implementation science studies in genomic medicine in the funded NIH portfolio over the past 5 years. To move the genomics field forward, investigator-initiated research grants should employ rigorous implementation science methods within diverse settings and populations.Genetics in Medicine advance online publication, 26 October 2017; doi:10.1038/gim.2017.180.

  10. Estimating Required Contingency Funds for Construction Projects using Multiple Linear Regression

    National Research Council Canada - National Science Library

    Cook, Jason J

    2006-01-01

    Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund...

  11. Implementing California's School Funding Formula: Will High-Need Students Benefit? Technical Appendix

    Science.gov (United States)

    Hill, Laura; Ugo, Iwunze

    2015-01-01

    Intended to accompany "Implementing California's School Funding Formula: Will High-Need Students Benefit?," this appendix examines the extent to which school shares of high-need students vary relative to their district concentrations by grouping approximately 950 school districts by their share of high-need students, arraying them into…

  12. Priority Determination for AVC Funded R&D Projects.

    Science.gov (United States)

    Wilkinson, Gene L.

    As an extension of ideas suggested in an earlier paper which proposed a project control system for Indiana University's Audio-Visual Center (see EM 010 306), this paper examines the establishment of project legitimacy and priority within the system and reviews the need to stimulate specific research proposals as well as generating a matrix of…

  13. [Review and analysis of transplant biological research projects funded by National Natural Science Foundation of China].

    Science.gov (United States)

    Gong, Weihua; Sun, Ruijuan; Dong, Erdan

    2015-08-01

    To study the funding and achievements in the field of organ transplantation support by the National Natural Science Foundation of China (NSFC). A search of NSFC database was made by using the key word "transplantation" and excluding "bone marrow transplantation" for the projects funded between 1988 and 2013. SCI indexed publications that marked with NSFC project number were collected by searching each grant number in the database of the Web of Science. Six hundreds fifty-five projects were identified and received about 220 million yuan in grant funding. These funded research projects were distributed among 25 provinces and autonomous regions, however, which were mainly in the developed coastal areas; of them, 43 (6.56%) projects were granted in xenotransplantation and 17 projects (2.60%) were funded in the field of traditional Chinese medicine-related organ transplantation; Transplantation on blood vessels, heart, kidney, liver, lung, small intestine, pancreatic, cornea, trachea, skin, etc. were primarily performed in research. Nine hundreds and sixty-one SCI-indexed publications were achieved. Magnitude and intensity of NSFC funding, output of SCI publications have been increasing, suggesting that NSFC positively promotes the development of organ transplantation. Although a great progress of transplantation has been made, basic and translational studies should be vigorously strengthened.

  14. Sizing ERP implementation projects: an activity-based approach

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.

    2008-01-01

    ERP implementation projects affect large parts of an implementing organization and lead to changes in the way an organization performs its tasks. The costs needed for the effort to implement these systems are hard to estimate. Research indicates that the size of an ERP project can be a useful

  15. Issues of Auditing Non-Reimbursable Financing Funding Projects

    Directory of Open Access Journals (Sweden)

    Andrei FLOREA

    2017-12-01

    Full Text Available The paper aims to deal both empirically and critically with the topical issues regarding the absorption of European funds and the role of the audit in this process. The paper contain an empirical study regarding general aspects of auditing with emphasis on commitment of agreed procedures. We will consider the main normative framework (ISRS 4400 and ISA 500 to expose a coherent and relevant synthesis of the agreed procedures engagement. The research will focus on presenting a critical study of dynamics of audit activity in Romania in the last 10 years based on data collected from the CAFR annual reports and website. Through this study, the authors propose, based on statistical functions, an evaluation of quality level in audit and the development of a comparative risk analysis based on the qualitative-value indicators.

  16. Models of Charity Donations and Project Funding in Social Networks

    Science.gov (United States)

    Wojciechowski, Adam

    One of the key fundaments of building a society is common interest or shared aims of the group members. This research work is a try to analyze web-based services oriented towards money collection for various social and charity projects. The phenomenon of social founding is worth a closer look at because its success strongly depends on the ability to build an ad-hoc or persistent groups of people sharing their believes and willing to support external institutions or individuals. The paper presents a review of money collection sites, various models of donation and money collection process as well as ways how the projects' results are reported to their founders. There is also a proposal of money collection service, where donators are not charged until total declared help overheads required resources to complete the project. The risk of missing real donations for declared payments, after the collection is closed, can be assessed and minimized by building a social network.

  17. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  18. Implementing Large Projects in Software Engineering Courses

    Science.gov (United States)

    Coppit, David

    2006-01-01

    In software engineering education, large projects are widely recognized as a useful way of exposing students to the real-world difficulties of team software development. But large projects are difficult to put into practice. First, educators rarely have additional time to manage software projects. Second, classrooms have inherent limitations that…

  19. IMPACT OF GRANT PROJECTS IMPLEMENTATION IN ROMANIAN HIGHER EDUCATION INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Vlad S. PETCU

    2016-07-01

    Full Text Available Romanian Higher Education Institutions were one of the main beneficiaries of European funding in the 2007-2013 funding excercise, especially in the Sectoral Operational Programme Human Resources Development. Analyzing the data provided by 21 public universities in Romania, we find that Universities have accessed in a significant proportion two types of projects: those dedicated to transition from school to active life and those dedicated to doctoral studies. Also, the proportion of the European funds attracted by HEIs is an overwhelming part of the allocation of reference (over 40% since 2011, and also a significant proportion of total revenues universities (~15.5 % for 2011-2014.

  20. Efficient and effective implementation of alternative project delivery methods.

    Science.gov (United States)

    2017-05-01

    Over the past decade, the Maryland Department of Transportation State Highway : Administration (MDOT SHA) has implemented Alternative Project Delivery (APD) methods : in a number of transportation projects. While these innovative practices have produ...

  1. The Council of Academic Hospitals of Ontario (CAHO) Adopting Research to Improve Care (ARTIC) Program: Reach, Sustainability, Spread and Lessons Learned from an Implementation Funding Model.

    Science.gov (United States)

    Moore, Julia E; Grouchy, Michelle; Graham, Ian D; Shandling, Maureen; Doyle, Winnie; Straus, Sharon E

    2016-05-01

    Despite evidence on what works in healthcare, there is a significant gap in the time it takes to bring research into practice. The Council of Academic Hospitals of Ontario's Adopting Research to Improve Care program addresses this research-to-practice gap by incorporating the following components into its funding program: strategic selection of evidence for implementation, education and training for implementation, implementation supports, executive champions and governance, and evaluation. Funded projects have been sustained (76% reported full sustainability) and spread to over 200 new sites. Lessons learned include the following: assess readiness, develop tailored implementation materials, consider characteristics of implementation supports, protect champion time and consider evaluation feasibility. Copyright © 2016 Longwoods Publishing.

  2. 7 CFR 3405.19 - Monitoring progress of funded projects.

    Science.gov (United States)

    2010-01-01

    ... RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE HIGHER EDUCATION CHALLENGE GRANTS... reform, and opportunities to enhance dissemination of exemplary end products/results. (b) An Annual..., including: A review of project objectives and accomplishments; a description of any products and outcomes...

  3. Open Access Policy for IDRC-Funded Project Outputs | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Open access is of fundamental importance to IDRC's mandate and to ... Grey literature must be placed in the IDRC Digital Library;; All project outputs identified ... website or in a reasonably well-established and high quality repository[1]. ... The Directory of Open Access Journals,maintained by Infrastructure Services for Open ...

  4. Evaluation of the Parent-Implemented Communication Strategies (PiCS) Project Using the Multiattribute Utility (MAU) Approach

    Science.gov (United States)

    Stoner, Julia B.; Meadan, Hedda; Angell, Maureen E.; Daczewitz, Marcus

    2012-01-01

    We conducted a multiattribute utility (MAU) evaluation to assess the Parent-Implemented Communication Strategies (PiCS) project which was funded by the Institute of Education Sciences (IES). In the PiCS project parents of young children with developmental disabilities are trained and coached in their homes on naturalistic and visual teaching…

  5. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  6. Causes of time overrun of education trust fund building projects in ...

    African Journals Online (AJOL)

    The study surveyed Education Trust Fund building projects in some tertiary institutions in north central Nigeria with the aim of ascertaining the causes of time overrun of these projects. The survey was carried out with the help of a structured questionnaire administered to clients, consultants and contractors' alike.

  7. IMPLEMENTING SMALL AND MEDIUM IT PROJECTS IN SMALL AND MEDIUM ENERPRISES

    Directory of Open Access Journals (Sweden)

    Felix DUMITRESCU

    2014-06-01

    Full Text Available Information technology is essential nowadays for all companies. Small enterprises are an important part of the economy and this article aims at providing some useful insight in implementing modern IT projects to their benefit. Due to the limited funding available for the IT infrastructure in most start-ups and small businesses, the projects should be adapted to fulfill the needs of the company for the lowest cost. The paper will start by defining small and medium project management theory and outlining the target of the study, small and medium sized companies. Next it will show a number of case studies of IT projects implemented in different types of small companies in Romania. Based on these implementations the article will draw some conclusions relevant to most small companies which need to design or improve their IT infrastructure.

  8. Hypersonic Technology Developments with EU Co-Funded Projects

    Science.gov (United States)

    2010-09-01

    and Hypersonic Systems and Technologies Conference, AIAA-2006-8109, 06-09/11 2006, Canberra, Australia. [18] Karl S., Hannemann K., Steelant J. and...Canberra, Australia. [23] Haidn, O., Ciezki, H., Hannemann , K. and Karl., S., Selected Supersonic Combustion Activities at DLR within the European...LAPCAT Project, 2nd European Conference for Aerospace Sciences (EUCASS), July 2007, Brussels, Belgium. [24] Martinez-Schram J. , Karl S., Hannemann K

  9. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... bridge project be programmed for funding once eligibility has been determined? (a) All projects will be... time, the project will be acknowledged as either BIA and Tribally owned, or non-BIA owned and placed in...

  10. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  11. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  12. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  13. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  14. Decommissioning Project Manager's Implementing Instructions (PMII)

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    Decommissioning Project personnel are responsible for complying with these PMII. If at any time in the performance of their duties a conflict between these instructions and other written or verbal direction is recognized or perceived, the supervisor or worker shall place his/her work place in a safe condition, stop work, and seek resolution of the conflict from the Decommissioning Project Manager or his designee

  15. Important projects are being implemented jointly

    International Nuclear Information System (INIS)

    Medeliene, D.

    1998-01-01

    Full text: Sweden is continuing its support to Lithuania in the field of nuclear safety. The major current projects include the testing of gap between graphite and pressure tube measuring device, the pressure tube investigation of material properties, content of hydrogen, microstructure, etc., ALS Structure verification using non-destructive testing, Conceptual study on Leak Before Break, Management seminars for VATESI, Multimedia System for the Ignalina NPP's Information Center and Waste management projects. Some of the projects are partially financed by Ignalina NPP. Sweden and Norway provide financing for the extremely important and expensive project - Physical protection: perimeter around the plant. Two new EC projects, Continuation of support to VATESI: licensing, inservice and decommissioning, and Phare TSO project to help building up TSO competence in Lithuania are no less important. In the beginning of September a functional exercise was organised with the Ignalina NPP emergency preparedness Information unit. This exercise was the second one of the two to prepare the personnel for the problems they have to solve in communication with public and media in the case of an accident at the Ignalina NPP

  16. Jerneh gas project challenges and implementation performance

    International Nuclear Information System (INIS)

    Perreau, M.E.

    1993-01-01

    The Jerneh gas project is part of Peninsular Malaysia's Gas Utilization Project, a mammoth undertaking to provide gas from the offshore fields off Malaysia's East Coast, to power stations and other industrial users throughout Peninsular Malaysia and Singapore. Prior to 1992, the only customers of the offshore Peninsular Malaysia gas were a local power station, and a steel mill in Terengganu, linked to the Phase 1 pipeline system. The Bekok platform is Esso Production Malaysia Inc. (EPMI)'s gas collection platform for existing associated gas fields. The Duyong and Sotong platforms are gas production/compression platforms operated by PETRONAS. In late 1991, the onshore pipeline system was extended by PETRONAS to cover the west and south coasts of Peninsular Malaysia and Singapore depicted in the map as the Phase 2 system. With the completion of the Jerneh platform and offshore trunklines, Jerneh became the primary source of supply to an increased number of customers in the wider Phase 2 gas network. Jerneh is estimated to have three TCF of non-associated gas. Phase 1 customers were utilizing about 120 MSCFD and the demand is expected to initially step-up to 400 MSCFD in 1992 and progressively increase thereafter. This paper provides an overview of the US$400 M Jerneh project for which detailed design commenced in 1989 and was commissioned in 1992. The paper describes the technical challenges, project execution, safety record and actions to achieve the fast track schedule for this project

  17. 5 CFR 470.313 - Project implementation regulations.

    Science.gov (United States)

    2010-01-01

    ... project must be approved by OPM and shall have full force and authority pursuant to Title VI of the Civil... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project implementation regulations. 470... PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  18. Funding Medical Research Projects: Taking into Account Referees' Severity and Consistency through Many-Faceted Rasch Modeling of Projects' Scores.

    Science.gov (United States)

    Tesio, Luigi; Simone, Anna; Grzeda, Mariuzs T; Ponzio, Michela; Dati, Gabriele; Zaratin, Paola; Perucca, Laura; Battaglia, Mario A

    2015-01-01

    The funding policy of research projects often relies on scores assigned by a panel of experts (referees). The non-linear nature of raw scores and the severity and inconsistency of individual raters may generate unfair numeric project rankings. Rasch measurement (many-facets version, MFRM) provides a valid alternative to scoring. MFRM was applied to the scores achieved by 75 research projects on multiple sclerosis sent in response to a previous annual call by FISM-Italian Foundation for Multiple Sclerosis. This allowed to simulate, a posteriori, the impact of MFRM on the funding scenario. The applications were each scored by 2 to 4 independent referees (total = 131) on a 10-item, 0-3 rating scale called FISM-ProQual-P. The rotation plan assured "connection" of all pairs of projects through at least 1 shared referee.The questionnaire fulfilled satisfactorily the stringent criteria of Rasch measurement for psychometric quality (unidimensionality, reliability and data-model fit). Arbitrarily, 2 acceptability thresholds were set at a raw score of 21/30 and at the equivalent Rasch measure of 61.5/100, respectively. When the cut-off was switched from score to measure 8 out of 18 acceptable projects had to be rejected, while 15 rejected projects became eligible for funding. Some referees, of various severity, were grossly inconsistent (z-std fit indexes less than -1.9 or greater than 1.9). The FISM-ProQual-P questionnaire seems a valid and reliable scale. MFRM may help the decision-making process for allocating funds to MS research projects but also in other fields. In repeated assessment exercises it can help the selection of reliable referees. Their severity can be steadily calibrated, thus obviating the need to connect them with other referees assessing the same projects.

  19. Development and implementation of a residency project advisory board.

    Science.gov (United States)

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  20. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  1. 44 CFR 80.17 - Project implementation.

    Science.gov (United States)

    2010-10-01

    ... property, the method of valuation and basis for the purchase offer, and the final offer amount. The offer... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND.... The subgrantee shall take steps to ensure it does not acquire or include in the project properties...

  2. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  3. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  4. Implementation of municipal health promoting projects in primary schools: teachers perspective

    DEFF Research Database (Denmark)

    Nordin, Lone Lindegard

    2013-01-01

    . The project is funded by the Danish Ministry of Science, University of Aarhus and Silkeborg municipality, and involves 5 primary schools, 23 teachers and 233 pupils from 7th to 9 class. The project is positioned within the critical approach to school health education and health promotion, developed......Implementation of municipally health promoting projects' in primary schools: teachers perspective Research question This paper discusses the findings from a qualitative research, that aimed to investigate how teachers in primary schools implemented municipal health promoting projects focusing...... that there is a “gap” between policy and practice according to aim, content and methods, and that teachers practice can be explained as coping mechanism. The key findings include: • Teachers practice is closer to traditional health education than critical health education. • Teachers priorities the mandatory teaching...

  5. Analysis of Propagation Plans in NSF-Funded Education Development Projects

    Science.gov (United States)

    Stanford, Courtney; Cole, Renee; Froyd, Jeff; Henderson, Charles; Friedrichsen, Debra; Khatri, Raina

    2017-08-01

    Increasing adoption and adaptation of promising instructional strategies and materials has been identified as a critical component needed to improve science, technology, engineering, and mathematics (STEM) education. This paper examines typical propagation practices and resulting outcomes of proposals written by developers of educational innovations. These proposals were analyzed using the Designing for Sustained Adoption Assessment Instrument (DSAAI), an instrument developed to evaluate propagation plans, and the results used to predict the likelihood that a successful project would result in adoption by others. We found that few education developers propose strong propagation plans. Afterwards, a follow-up analysis was conducted to see which propagation strategies developers actually used to help develop, disseminate, and support their innovations. A web search and interviews with principal investigators were used to determine the degree to which propagation plans were actually implemented and to estimate adoption of the innovations. In this study, we analyzed 71 education development proposals funded by the National Science Foundation and predicted that 80% would be unsuccessful in propagating their innovations. Follow-up data collection with a subset of these suggests that the predictions were reasonably accurate.

  6. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  7. Spent Nuclear Fuel (SNF) Project Safety Basis Implementation Strategy

    International Nuclear Information System (INIS)

    TRAWINSKI, B.J.

    2000-01-01

    The objective of the Safety Basis Implementation is to ensure that implementation of activities is accomplished in order to support readiness to move spent fuel from K West Basin. Activities may be performed directly by the Safety Basis Implementation Team or they may be performed by other organizations and tracked by the Team. This strategy will focus on five key elements, (1) Administration of Safety Basis Implementation (general items), (2) Implementing documents, (3) Implementing equipment (including verification of operability), (4) Training, (5) SNF Project Technical Requirements (STRS) database system

  8. [The analysis on the funding of Natural Science Foundation of China for acupuncture projects from 2005 to 2015].

    Science.gov (United States)

    Deng, Hongyong; Xu, Ji

    2017-05-12

    The funding of Natural Science Foundation of China (NSFC) for acupuncture projects from 2005 to 2015 was summarized and analyzed. The results indicated during past 11 years, 711 projects regarding acupuncture were funded by NSFC, with a total of 281 million RMB, accounting for 12.39% in TCM projects. It was concluded the funding for acupuncture projects was increased year by year, but was still relatively weak; in addition, the funding was unbalanced in different areas and organizations, mainly in Beijing, Shanghai, Sichuan, Guangdong, Tianjin, and the continuity and variability both existed in research content and direction.

  9. Experience in implementing projects in Eastern Europe

    International Nuclear Information System (INIS)

    Weichard, A.; Bauer, I.; Rieck, R.; Ziehm, R.

    2007-01-01

    The article covers the present projects and activities in Eastern Europe of Nukem Technologies GmbH. The company's East European business began in 1973 in the field of uranium trading. After difficult negotiations in the period of the ''cold war'' it became possible to enter into an agreement with the Soviet foreign trade organization, Techsnabexport, about purchases of uranium for Western nuclear power plants. In the course of Nukem's realignment in the late 1980s, the focus was shifted more and more to the possibility of exporting into other countries the technologies developed and proven in Germany. This included countries in Eastern Europe. The situation changed abruptly with the political opening of Eastern Europe. A large potential market opened to Nukem as a supplier of technologies and plants for waste treatment and, later, the wider area of decommissioning. The partners in Eastern Europe were interested in proven, modern solutions. The ensuing success was also due to the fact that Nukem, in the early nineties, hired specialists from the new German federal states who had studied in the Soviet Union and were familiar with Russian technology, language, and culture. Soliciting analogous projects in the countries of Eastern Europe other than the former Soviet Union was begun in a parallel process. Very soon it turned out that also the interim storage of spent fuel elements constituted a potential market. (orig.)

  10. Napa River Sediment TMDL Implementation and Habitat Enhancement Project

    Science.gov (United States)

    Information about the SFBWQP Napa River Sediment TMDL Implementation and Habitat Enhancement Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  11. Evaluation of the Navy Implementation of DOD Financial Management Regulation, Volume 14, Administrative Control of Funds and Antideficiency Act Violations

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    On August 1, 1995, the Under Secretary of Defense (Comptroller) released for implementation Financial Management Regulation, volume 14, "Administrative Control of Funds and Antideficiency Act Violations," August 1, 1995...

  12. Overcoming Barriers in the Implementation of Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-15

    characterization techniques and strategies; assessment of remediation technologies; techniques and strategies for post-remediation compliance monitoring; special issues such as the remediation of sites with dispersed radioactive contamination or mixed contamination by hazardous and radioactive substances, as well as monitored natural attenuation; and long term management issues at sites with residual contamination. It was noted that, although the understanding of the need to address radiological liabilities had gained considerable momentum since the end of the Cold War, in many Member States actual remediation programmes have made little progress beyond the assessment and perhaps the planning phase. This publication analyses the various drivers for remediation projects, possible obstacles and potential solutions to overcome those obstacles. It is noted that care must be taken when establishing measures that are intended to foster increased protection, for example a very prescriptive regulatory framework, as such measures may turn out to be counterproductive. The main obstacle in most cases is a lack of funding. A number of creative ways to structure projects and to identify sources of funds are discussed in this book.

  13. Overcoming Barriers in the Implementation of Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2013-01-01

    characterization techniques and strategies; assessment of remediation technologies; techniques and strategies for post-remediation compliance monitoring; special issues such as the remediation of sites with dispersed radioactive contamination or mixed contamination by hazardous and radioactive substances, as well as monitored natural attenuation; and long term management issues at sites with residual contamination. It was noted that, although the understanding of the need to address radiological liabilities had gained considerable momentum since the end of the Cold War, in many Member States actual remediation programmes have made little progress beyond the assessment and perhaps the planning phase. This publication analyses the various drivers for remediation projects, possible obstacles and potential solutions to overcome those obstacles. It is noted that care must be taken when establishing measures that are intended to foster increased protection, for example a very prescriptive regulatory framework, as such measures may turn out to be counterproductive. The main obstacle in most cases is a lack of funding. A number of creative ways to structure projects and to identify sources of funds are discussed in this book.

  14. Analysis and Countermeasures of PPP Project Implementation Difficulties

    Directory of Open Access Journals (Sweden)

    Xu Yifeng

    2017-01-01

    Full Text Available Since the beginning of 1995, the model of PPP project construction was introduced in China. It has been widely used in many fields such as energy, municipal, and so on. It has accumulated a lot of experience in improving the investment system structure and guiding the social capital into the infrastructure field. But the mode of PPP project construction in the implementing process in different environment often encounters a lot of problems. Based on a large amount of analysis on the existing literature, this paper resorts out the PPP project model combining the problems occurred in the implementation process of PPP project, and summarizes corresponding countermeasures aiming at the problems in order to provide help for PPP project implementation in the future.

  15. The Role of Policy Champions and Learning in Implementing Horizontal Environmental Policy Integration: Comparative Insights from European Structural Fund Programmes in the U.K.

    Directory of Open Access Journals (Sweden)

    Tony Gore

    2014-08-01

    Full Text Available This paper examines attempts to integrate environmental sustainability goals into the design and implementation of projects funded by the EU Structural Funds programmes in the U.K. between 2000 and 2006. It does so by comparing how the two “horizontal priorities” (environmental sustainability and gender equality fared in terms of understanding and acceptance by project applicants. It places this material within the wider context of literature on environmental policy integration and inter-agency cooperation. A “policy coordination” framework is used as a heuristic device to construct an account of the ways in which the two themes were handled through the interplay of the myriad of actors and organisations involved in the process. A key part in this involved the deployment of “policy champions” to work with external organisations bidding for funding to support projects that formed the core of programme implementation. The paper also examines the variable reactions on the part of project designers to the requirement to incorporate environmental and gender goals and the greater inter-professional networking that these implied. The comparison between the two priorities clearly demonstrates the difficulties inherent in the breadth and complexity of environmental issues and the need in the first instance to link them to relatively simple actions directly associated with economic development activity. The study concludes that this is essentially the first step in a more protracted “policy learning” process.

  16. Causes of project implementation delay in the Ethiopian Electric ...

    African Journals Online (AJOL)

    This study identifies the major sources of delay in the implementation of construction projects in the Ethiopian electric utility enterprise. It also investigates the magnitude of schedule variance and cost overrun experienced by the Universal Electric Access Program (UEAP)due to implementation delay. Primary data were ...

  17. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  18. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  19. Systemwide Implementation of Project-Based Learning: The Philadelphia Approach

    Science.gov (United States)

    Schwalm, Jason; Tylek, Karen Smuck

    2012-01-01

    Citywide implementation of project-based learning highlights the benefits--and the challenges--of promoting exemplary practices across an entire out-of-school time (OST) network. In summer 2009, the City of Philadelphia and its intermediary, the Public Health Management Corporation (PHMC), introduced project-based learning to a network of more…

  20. Poland - Electricity and gas marked development study and practical guidelines for using EU funds. Practical guidelines for using EU funds for energy projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-12-01

    The present report is prepared as part of the project 'Poland - Electricity and gas market development study and practical guidelines for using EU - funds'. The EU structural and cohesion funds are presently considered the most relevant funds concerning support to energy projects. In general, the Polish administration of the EU structural funds is strongly decentralized. The eligible project types to be supported from the various structural funds are described in a number of sector programmes. The sector programmes are described in vertical view, meaning that it is difficult to assess what kind of energy projects are eligible for support and, if eligible, then under which programme. This report presents a horizontal view of the various programmes in order to give an overview of the possibilities of support to energy related projects. The background for this report is a study of the following sector programmes: 1. Improvement of the competitiveness of enterprises. 2. Human resources development. 3. Restructuring and modernization of food sector and rural development. 4. Fisheries and fish processing. 5. Transport - maritime economy. 6. Integrated regional operational programme. 7. Technical assistance. Based on this review, it can be stated that energy projects in general have a low priority but can be supported under various measures within the programmes. (BA)

  1. 42 CFR 137.338 - Must funds from other sources be incorporated into a construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Project Assumption Process § 137.338 Must funds from other sources be... 42 Public Health 1 2010-10-01 2010-10-01 false Must funds from other sources be incorporated into a construction project agreement? 137.338 Section 137.338 Public Health PUBLIC HEALTH SERVICE...

  2. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  3. Decoupling, re-Engaging: managing trust relationships in implementation projects

    DEFF Research Database (Denmark)

    Rose, Jeremy; Schlichter, Bjarne Rerup

    2012-01-01

    , and the complex demands of managing those fluctuations. We investigate evolving trust relationships in a longitudinal case analysis of a large Integrated Hospital System implementation for the Faroe Islands. Trust relationships suffered various breakdowns, but the project was able to recover and eventually meet...... its goals. Based on concepts from Giddens’ later work on modernity, we develop two approaches for managing dynamic trust relationships in implementation projects: decoupling and re-engaging.......An important aspect of the successful implementation of large information systems (such as ERP systems) is trust. These implementations impact the legitimate interests of many groups of stakeholders, and trust is a critical factor for success. Trust in the project is contingent upon many factors...

  4. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  5. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  6. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  7. Hidropower project implementation. Public investment priorities of Romanian Electricity Authority (RENEL)

    International Nuclear Information System (INIS)

    Bogdan Valeriu; Pencea, Doru

    1994-01-01

    RENEL manages more than 20 hydropower projects in various construction stages. Some of them are multipurpose projects designed for water supply, flood control and irrigation. The construction schedules and completion terms are prolonged for all of them due to insufficient investment funds. Priority in public investment for hydropower projects is necessary because it generates favorable effects for both local communities and national economy. Appropriate methodology and suitable criteria should be established in order to select the projects to be financed taking into account the large initial investments and long implementation terms. The national hydropower potential is around 40,000 GWh/year and the corresponding installed power would be 14,800 MW. At present, the power production capacity is 16,240 GWh/year and the installed hydropower is 5,880 MW. (authors)

  8. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  9. Fiscal Year 2011 Afghanistan Infrastructure Fund Projects Are Behind Schedule and Lack Adequate Sustainment Plans

    Science.gov (United States)

    2012-07-30

    International Security Assistance Force Dr . S. Ken Yamashita USAID Mission Director for Afghanistan This report discusses the results of the Office...committees, in addition to AIF, Congress noted that State planned to fund AIP projects by reprogramming existing foreign assistance resources to...availability by up to 25-27 megawatts (MW)22 and extended availability to two previously underserved areas of Kandahar City in the west and southeast

  10. The implementation of a global fund grant in Lesotho: applying a framework on knowledge absorptive capacity.

    Science.gov (United States)

    Biesma, Regien; Makoa, Elsie; Mpemi, Regina; Tsekoa, Lineo; Odonkor, Philip; Brugha, Ruairi

    2012-02-01

    One of the biggest challenges in scaling up health interventions in sub-Saharan Africa for government recipients is to effectively manage the rapid influx of aid from different donors, each with its own requirements and conditions. However, there is little empirical evidence on how governments absorb knowledge from new donors in order to satisfy their requirements. This case study applies Cuellar and Gallivan's (2006) framework on knowledge absorptive capacity (AC) to illustrate how recipient government organisations in Lesotho identified, assimilated and utilised knowledge on how to meet the disbursement and reporting requirements of Lesotho's Round 5 grant from the Global Fund to Fight AIDS, TB and Malaria (Global Fund). In-depth topic guided interviews with 22 respondents and document reviews were conducted between July 2008 and February 2009. Analysis focused on six organisational determinants that affect an organisation's absorptive capacity: prior-related knowledge, combinative capabilities, motivation, organisational structure, cultural match, and communication channels. Absorptive capacity was mostly evident at the level of the Principal Recipient, the Ministry of Finance, who established a new organisational unit to meet the requirements of Global Fund Grants, while the level of AC was less advanced among the Ministry of Health (Sub-Recipient) and district level implementers. Recipient organisations can increase their absorptive capacity, not only through prior knowledge of donor requirements, but also by deliberately changing their organisational form and through combinative capabilities. The study also revealed how vulnerable African governments are to loss of staff capacity. The application of organisational theory to analyse the interactions of donor agencies with public and non-public country stakeholders illustrates the complexity of the environment that aid recipient governments have to manage. Copyright © 2011 Elsevier Ltd. All rights reserved.

  11. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  12. Toward an effective implementation of clean development mechanism projects in China

    International Nuclear Information System (INIS)

    Zhang Zhongxiang

    2006-01-01

    With the already huge and growing amount of greenhouse gas emissions and a great deal of low-cost abatement options available, China is widely expected as the world's number one host country of clean development mechanism (CDM) projects. But, making this potential a reality represents a significant challenge for China, because there has been a general lack of awareness by both the Chinese government and business communities, clear institutional structure, and implementation strategy. This has raised great concern about China's ability to compete internationally for CDM projects and exploit fully its CDM potential. This paper aims to address how CDM projects will be effectively implemented in China by examining the major CDM capacity building projects in China with bilateral and multilateral donors, the treatment of low-cost, non-priority CDM projects, and how a system for application, approval, and implementation of CDM projects is set up in China and what roles the main institutional actors are going to play in the system. We conclude that these capacity building assistances, the establishment of streamlined and transparent CDM procedures and sound governance, and the lessons learned and experience gained from the implementation of the CDM project in Inner Mongolia and the two Prototype Carbon Fund' projects will help China to take advantage of CDM opportunities. Moreover, in order to further capitalize on its CDM potential, there is a pressing need for the Chinese government to amend its current interim CDM regulations, in particular those controversial provisions on the eligibility to participate in CDM projects in China and the distribution of the revenues derived from CDM project between the project developer and the Chinese government. We believe that taking these capacity building projects and the recommended actions to clearly define the sustainable development objective of the CDM and disseminate CDM knowledge to local authorities and project developers as

  13. GREENWAY IN ITALY: EXAMPLES OF PROJECTS AND IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Pasquale Dal Sasso

    2012-06-01

    Full Text Available The study analyses the greenway projects implemented in Italy, summarising their characteristics in a table that contains basic information concerning the geographical location, year of implementation, the type of layout and size, the state of implementation; the Institution that proposed the implementation, the official name, the territorial feature, the socio-economic and cultural aims, references to bibliographic and web resources and to their inclusion in plans and projects. The analysis has allowed to verify the compliance of individual contributions to the definitions attributed to the greenway from national and international associations. It has been possible to verify the use of greenways as physical support to spatial planning and the promotion of economic and productive development of rural areas.

  14. The Positive Impacts Of American Reinvestment And Recovery Act (ARRA) Funding To The Waste Management Program On Hanford's Plateau Remediation Project

    International Nuclear Information System (INIS)

    Blackford, L.T.

    2010-01-01

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

  15. From innovation to implementation - SME collaboration in student projects

    DEFF Research Database (Denmark)

    Bridgwood, Ian

    The Center for Bachelor of Engineering Studies at the Technical University of Denmark (DTU Diplom) [1] provides B.Eng. programs with the Conceive Design Implement and Operate framework [2] as a central element. Courses are designed to be a source of innovation, particularly in relation to small a...... and medium sized enterprises (SME) in the region. The project based courses teach students to undertake the analysis, design and implementation of systems which are relevant to and in cooperation with SMEs....

  16. Implementation of NUREG-1318 guidance within the Yucca Mountain Project

    International Nuclear Information System (INIS)

    La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

    1990-01-01

    The US Department of Energy's Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ''Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements'' for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs

  17. A financing model to solve financial barriers for implementing green building projects.

    Science.gov (United States)

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  18. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    Science.gov (United States)

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  19. Russian energy efficiency projects: lessons learnt from Activities Implemented Jointly pilot phase

    International Nuclear Information System (INIS)

    Korppoo, Anna

    2005-01-01

    Russia needs to improve the efficiency of energy. Failure to do so will retard the economic recovery of the country, but the energy sector is lacking both domestic and foreign investments. JI projects could provide the underfinanced Russian energy sector with additional investments. AIJ pilot project experiences provide an overview of the potential difficulties for future JI projects. Institutional problems were the most important category. Most of these problems remain, and the lack of ratification of the Kyoto Protocol by Russia has formed a new very significant barrier. Implementation level problems caused some problems to AIJ projects, but they are likely to have less impact on the better prepared JI projects. The character of funding-related problems has changed: for AIJ projects the main problem was that emission reductions could not be credited, whereas future JI projects will experience more competition in the Kyoto market where the overall investment climate and the availability of local cofunding are more relevant. Therefore, the unfinished economic and energy sector reforms currently discourage JI investments. The project experiences so far have been dismal, and if Russian policy-makers cannot improve this performance, only few JI projects can be expected in the future

  20. REGULATORY FUNDAMENTALS FOR IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS IN INDUSTRY

    Directory of Open Access Journals (Sweden)

    L. V. Gubich

    2016-01-01

    Full Text Available The article provides an overview of the existing regulatory basis for the development of IIST. The features of IT projects management and a brief description of methodological recommendations on implementation of IT projects of the State scientific and technical Program «Electronic enterprise resource planning (CALS-ERP-technology» for 2011–2015 are considered.

  1. Responsibilities of the active participation of geoscientists in public funded projects

    Science.gov (United States)

    Correia, Victor; Fernandez, Isabel

    2016-04-01

    The European Federation of Geologists (EFG) is based in 24 European countries and represents over 50,000 geoscientists in Europe, working in organisations dealing with many of the critical societal challenges that came with fast population growing: soils fertility; fresh water; energy; and raw materials supply. This calls for the concerted contribution of networks of geoscientists to frame and answer the global challenges we are facing. In Europe, the Research and Innovation funding program Horizon 2020 provided a unique opportunity for EFG to play an active role in this context, and this justifies the direct involvement of EFG in several funded projects, ranging from international cooperation on raw materials supply to groundwater research or combined heat, power and metal extraction from ultra-deep ore bodies. But an active participation of a not for profit organization of geoscientists in such public funded projects brings responsibilities and reputational risks. The authors will describe how EFG is taking these responsibilities and facing the correspondent risks, through the involvement of certified professionals. The authors will highlight why EFG is keen in promoting the EurGeol professional title, ensuring title holders are skilled and competent to deliver high quality services within the practice of geology, framed by a Code of Ethics and a commitment towards continuing professional development.

  2. Watershed manipulation project: Field implementation plan for 1990-1992

    International Nuclear Information System (INIS)

    Erickson, H.; Narahara, A.M.; Rustad, L.E.; Mitchell, M.; Lee, J.

    1993-02-01

    The Bear Brook Watershed in Maine (BBWM) was established in 1986 at Lead Mountain, Maine as part of the Environmental Protection Agency's (EPA) Watershed Manipulation Project (WPM). The goals of the project are to: (1) assess the chemical response of a small upland forested watershed to increased loadings of SO4, (2) determine interactions among biogeochemical mechanisms controlling watershed response to acidic deposition, and (3) test the assumptions of the Direct/Delayed Response Programs (DDRP) computer models of watershed acidification. The document summarizes the field procedures used in the establishment and initial implementation of the plot- and catchment- scale activities at the BBWM, and outlines plans for 1990-02 project activities

  3. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  4. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  5. Determination of the optimal proportions of public and private funds in project budget management

    Science.gov (United States)

    Pykhtin, Kirill; Simankina, Tatyana; Karmokova, Kristina; Zonova, Alevtina

    2017-10-01

    Although the historical period of public-private partnership in the Russian federation is rather short, yet this type of cooperation of private entrepreneurs and authorities became the major driver of growth in such areas as construction, utilities, infrastructure and energetics. However, even though the experience of foreign countries is much larger than of Russia, great number of human resources are still consumed within disputes and disquisitions in order to assess the ratio of private and public funds. The present paper is based on the idea that this ratio can be determined for each of the industries with the use of statistical data. The authors offered the change in project cost range within the project classification regarding to the “project scale” characteristic.

  6. San Francisco Bay Water Quality Improvement Fund Project Locations, San Francisco CA, 2017, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — The San Francisco Bay Water Quality Improvement Fund is a competitive grant program that is helping implement TMDLs to improve water quality, protect wetlands, and...

  7. 78 FR 25291 - Announcement of Funding Awards; Section 3 Program Coordination and Implementation; Fiscal Year 2010

    Science.gov (United States)

    2013-04-30

    ... funding under the Notice of Funding Availability (NOFA) for the Section 3 Program Coordination and.... (The Catalog of Federal Domestic Assistance Number for currently funded Initiatives under the Section 3... Valentine Reid, 816-777-2390. 7 50,000.00 East Armour Boulevard, Jackson, MO 64112-1254. Section 3 Program...

  8. Transforming School Funding: A Guide to Implementing Student-Based Budgeting (SBB)

    Science.gov (United States)

    Rosenberg, David; Gordon, Jeff; Hsu, Betty

    2014-01-01

    Student-Based Budgeting (sometimes called Weighted Student Funding, or Fair Student Funding, depending on the district) differs fundamentally from the traditional funding model, which distributes resources to schools in the form of staff and dollars designated for specific purposes. Student-Based Budgeting (SBB) allocates dollars to schools based…

  9. Implementing a Student-Based Funding Policy: Considerations for School Districts

    Science.gov (United States)

    Shambaugh, Larisa S.; Chambers, Jay G.

    2009-01-01

    As education budgets continue to tighten, increased attention is focused on how school districts can best distribute existing funds to schools and how schools can best use these funds. Student-based funding (SBF)--sometimes referred to as a weighted student formula--is one approach that school districts have taken during the past decade. SBF…

  10. Involvement of the US Department of Defense in Civilian Assistance, Part I: a quantitative description of the projects funded by the Overseas Humanitarian, Disaster, and Civic Aid Program.

    Science.gov (United States)

    Bourdeaux, Margaret Ellis; Lawry, Lynn; Bonventre, Eugene V; Burkle, Frederick M

    2010-03-01

    To review the history and goals of the US Department of Defense's largest civilian assistance program, the Overseas Humanitarian, Disaster and Civic Aid Program and to describe the number, geographic regions, years, key words, countries, and types of projects carried out under this program since 2001. Using the program's central database, we reviewed all approved projects since 2001 and tabulated them by year, combatant command, country, and key word. We also reviewed the project descriptions of projects funded between January 1, 2006, and February 9, 2008, and examined how their activities varied by combatant command and year. Of the 5395 projects in the database, 2097 were funded. Projects took place in more than 90 countries, with Southern, Pacific, and Africa Command hosting the greatest number. The most common types of projects were school, health, disaster response, and water infrastructure construction, and disaster-response training. The "global war on terror" was the key word most frequently tagged to project descriptions. Project descriptions lacked stated goals as well as implementation and coordination strategies with potential partners, and did not report outcome or impact indicators. The geographic reach of the program is vast and projects take place in a wide variety of public sectors. Yet their security and civilian assistance value remains unclear given the lack of stated project goals, implementation strategies, or measures of effectiveness. To facilitate transparency and policy discussion, we recommend project proposals include hypotheses as to how they will enhance US security, their relevance to the public sector they address, and outcome and impact indicators that can assess their value and effectiveness.

  11. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Science.gov (United States)

    2010-04-01

    ... INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian... funds be used for road construction and other projects? Yes, any tribe can request to have its planning... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road...

  12. Operational research within a Global Fund supported tuberculosis project in India: why, how and its contribution towards change in policy and practice

    Science.gov (United States)

    Sagili, Karuna D; Satyanarayana, Srinath; Chadha, Sarabjit S; Wilson, Nevin C; Kumar, Ajay M V; Oeltmann, John E; Chadha, Vineet K; Nagaraja, Sharath Burugina; Ghosh, Smita; Q Lo, Terrence; Volkmann, Tyson; Willis, Matthew; Shringarpure, Kalpita; Reddy, Ravichandra Chinnappa; Kumar, Prahlad; Nair, Sreenivas A; Rao, Raghuram; Yassin, Mohammed; Mwangala, Perry; Zachariah, Rony; Tonsing, Jamhoih; Harries, Anthony D; Khaparde, Sunil

    2018-01-01

    ABSTRACT Background: The Global Fund encourages operational research (OR) in all its grants; however very few reports describe this aspect. In India, Project Axshya was supported by a Global Fund grant to improve the reach and visibility of the government Tuberculosis (TB) services among marginalised and vulnerable communities. OR was incorporated to build research capacity of professionals working with the national TB programme and to generate evidence to inform policies and practices. Objectives: To describe how Project Axshya facilitated building OR capacity within the country, helped in addressing several TB control priority research questions, documented project activities and their outcomes, and influenced policy and practice. Methods: From September 2010 to September 2016, three key OR-related activities were implemented. First, practical output-oriented modular training courses were conducted (n = 3) to build research capacity of personnel involved in the TB programme, co-facilitated by The Union, in collaboration with the national TB programme, WHO country office and CDC, Atlanta. Second, two large-scale Knowledge, Attitude and Practice (KAP) surveys were conducted at baseline and mid-project to assess the changes pertaining to TB knowledge, attitudes and practices among the general population, TB patients and health care providers over the project period. Third, studies were conducted to describe the project’s core activities and outcomes. Results: In the training courses, 44 participant teams were supported to develop research protocols on topics of national priority, resulting in 28 peer-reviewed scientific publications. The KAP surveys and description of project activities resulted in 14 peer-reviewed publications. Of the published papers at least 12 have influenced change in policy or practice. Conclusions: OR within a Global Fund supported TB project has resulted in building OR capacity, facilitating research in areas of national priority and

  13. Funding and Strategic Alignment Guidance for Infusing Small Business Innovation Research Technology into Aeronautics Research Mission Directorate Projects for 2016

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2017-01-01

    This report is intended to help NASA program and project managers incorporate Small Business Innovation Research (SBIR) technologies into NASA Aeronautics Research Mission Directorate (ARMD) projects. Other Government and commercial project managers interested in ARMD funding opportunities through NASA's SBIR program will find this report useful as well.

  14. Externally Funded Research and ‎Development ‎‎Projects in Perspective of Learning

    Directory of Open Access Journals (Sweden)

    Rauno Ilmari Pirinen

    2011-10-01

    Full Text Available The focus of this study is on stunted-centered learning activity ‎which ‎collaborates ‎learning ‎and research in an interoperative ‎way ‎and shares the regional-national ‎research ‎and development ‎‎(R&D capabilities, interests and agenda.‎ The study is addressed ‎to ‎the cooperation model and factors of learning within R&D ‎projects that develop ‎academic knowledge, competences and ‎regional—national capabilities for all ‎participants by ‎contributing ‎authentic R&D scopes or problems in real-life ‎situations. The study includes analysis of the ‎research data regarding ‎the R&D project, namely SATERISK (SATEllite ‎positioning ‎‎RISKs, which was initiated by two security ‎management students at Laurea University of ‎Applied ‎Sciences ‎and that has evolved into a substantial three-year R&D ‎project ‎between 2008 and 2011 and is funded by the ‎Finnish ‎Funding Agency for ‎Technology and Innovations (TEKES.‎

  15. A study on the funding system for efficient implementation of nuclear R and D

    International Nuclear Information System (INIS)

    Chung, Whan Sam; Yang, M. H.; Song, K. D.; Kim, H. J.; Yun, S. W.

    2000-08-01

    This study is investigated and analysed as follows : first, investigation on the general account, special account, fund system as a financial source and deep analysis on charging fee of Nuclear R and D Fund; second, background of the establishment on Nuclear R and D Fund; third, investigation on the domestic and oversea's R and D Fund system; fourth, searching for the objective and basic guideline for the reshuffle of electric power industry and the issues on public charging fee; fifth, in depth analysis on the legal background and the main issues of Nuclear R and D Fund; and sixth, comprehensive arrangement on the main issues through the study

  16. 24 CFR 1000.103 - How may IHBG funds be used for tenant-based or project-based rental assistance?

    Science.gov (United States)

    2010-04-01

    ... Housing Activities § 1000.103 How may IHBG funds be used for tenant-based or project-based rental assistance? (a) IHBG funds may be used for project-based or tenant-based rental assistance. (b) IHBG funds may be used for project-based or tenant-based rental assistance that is provided in a manner...

  17. UK's Brexit battle casts shadow over funding for international fusion projects

    International Nuclear Information System (INIS)

    Shepherd, John

    2017-01-01

    The ramifications of Brexit - the UK's decision to leave the European Union - have continued to send shockwaves through the nuclear energy community, since I explained in this column recently that the move also means withdrawing from the Euratom Treaty. Now the UK's divorce from the EU is posing a threat that could deal a major blow to international efforts in fusion research. In fact, confusing signals from the UK have cast doubt on future funding and support for two key areas of world fusion cooperation: the Oxfordshire-based Joint European Torus (Jet) programme and the International Thermonuclear Experimental Reactor (Iter) project at Cadarache in France.

  18. UK's Brexit battle casts shadow over funding for international fusion projects

    Energy Technology Data Exchange (ETDEWEB)

    Shepherd, John [nuclear 24, Redditch (United Kingdom)

    2017-04-15

    The ramifications of Brexit - the UK's decision to leave the European Union - have continued to send shockwaves through the nuclear energy community, since I explained in this column recently that the move also means withdrawing from the Euratom Treaty. Now the UK's divorce from the EU is posing a threat that could deal a major blow to international efforts in fusion research. In fact, confusing signals from the UK have cast doubt on future funding and support for two key areas of world fusion cooperation: the Oxfordshire-based Joint European Torus (Jet) programme and the International Thermonuclear Experimental Reactor (Iter) project at Cadarache in France.

  19. RO1 Funding for Mixed Methods Research: Lessons learned from the Mixed-Method Analysis of Japanese Depression Project

    OpenAIRE

    Arnault, Denise Saint; Fetters, Michael D.

    2011-01-01

    Mixed methods research has made significant in-roads in the effort to examine complex health related phenomenon. However, little has been published on the funding of mixed methods research projects. This paper addresses that gap by presenting an example of an NIMH funded project using a mixed methods QUAL-QUAN triangulation design entitled “The Mixed-Method Analysis of Japanese Depression.” We present the Cultural Determinants of Health Seeking model that framed the study, the specific aims, ...

  20. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  1. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  2. Collection and sharing of data and experience from EC-funded decommissioning projects

    International Nuclear Information System (INIS)

    Pflugrad, K.; Colquhoun, A.P.; Schreck, G.; Huske, M.; Petrasch, P.; Tuenckens, L.R.J.

    1999-01-01

    The European Commission's Fourth Framework Programme (1994-1998) on Nuclear Fission Safety includes the funding of projects relevant to the decommissioning of nuclear installations. The objectives of the programme for decommissioning are to continue the development of technology (a) to collect and analyse relevant data (b) to test and evaluate strategies and techniques and to stimulate the exchange of information and experience. Objective (b) involves related projects aimed at collecting and analysing data from past, current and future EC programmes and making them understandable and readily available in databases as well as studying how these and other databases might be integrated in a decommissioning strategic planning tool (SPT). This aims to assist EU organizations in making strategic choices for optimizing decommissioning programmes. This paper gives an update on database work, a progress report on the development of an EU access network and work on the standardization of cost item definitions. Progress on the SPT study is reviewed. (author)

  3. Lessons from comparative effectiveness research methods development projects funded under the Recovery Act.

    Science.gov (United States)

    Zurovac, Jelena; Esposito, Dominick

    2014-11-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) directed nearly US$29.2 million to comparative effectiveness research (CER) methods development. To help inform future CER methods investments, we describe the ARRA CER methods projects, identify barriers to this research and discuss the alignment of topics with published methods development priorities. We used several existing resources and held discussions with ARRA CER methods investigators. Although funded projects explored many identified priority topics, investigators noted that much work remains. For example, given the considerable investments in CER data infrastructure, the methods development field can benefit from additional efforts to educate researchers about the availability of new data sources and about how best to apply methods to match their research questions and data.

  4. The Determinants of State Spending on Higher Education: How Capital Project Funding Differs from General Fund Appropriations

    Science.gov (United States)

    Ness, Erik C.; Tandberg, David A.

    2013-01-01

    Our fixed-effects panel data analysis of state spending on higher education fills a near void of studies examining capital expenditures on higher education. In our study, we found that political characteristics (e.g., interest group activity, organizational structure, and formal powers) largely account for differences between general fund and…

  5. Analysis of renewable energy projects' implementation in Russia

    Science.gov (United States)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  6. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  7. Implementing Knowledge Translation Strategies in Funded Research in Canada and Australia: A Case Study

    Directory of Open Access Journals (Sweden)

    Gabriel Moore

    2016-09-01

    Full Text Available There is an emerging literature describing the use of knowledge translation strategies to increase the relevance and usability of research, yet there are few real-world examples of how this works in practice. This case study reports on the steps taken to embed knowledge translation strategies in the Movember Foundation's Men’s Mental Health Grant Rounds in 2013–14, which were implemented in Australia and Canada, and on the support provided to the applicants in developing their knowledge translation plans. It identifies the challenges faced by the Men’s Mental Health Program Team and how these were resolved. The strategies explored include articulating knowledge translation requirements, ensuring a common understanding of knowledge translation, assessing knowledge translation plans, methods of engaging end users, and building capacity with applicants. An iterative approach to facilitating knowledge translation planning within project development was rolled out in Australia just prior to Canada so that lessons learned were immediately available to refine the second roll out. Implementation included the use of external knowledge translation expertise, the development of knowledge translation plans, and the need for internal infrastructure to support monitoring and reporting. Differences in the Australian and Canadian contexts may point to differential exposure to the concepts and practices of knowledge translation. This case study details an example of designing and implementing an integrated knowledge translation strategy that moves beyond traditional dissemination models. Lessons learned point to the importance of a long lead-up time, the use of knowledge translation expertise for capacity building, the need for flexible implementation, and the need for efficiencies in supporting applicants.

  8. Geopolitical model of investment power station construction project implementation

    Science.gov (United States)

    Malafeyev, Oleg; Farvazov, Konstantin; Zenovich, Olga; Zaitseva, Irina; Kostyukov, Konstantin; Svechinskaya, Tatiana

    2018-04-01

    Two geopolitical actors implement a geopolitical project that involves transportaion and storage of some commodities. They interact with each other through a transport network. The network consists of several interconnected vertices. Some of the vetrices are trading hubs, storage spaces, production hubs and goods buyers. Actors wish to satify the demand of buyers and recieve the highest possible profit subject to compromise solution principle. A numerical example is given.

  9. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  10. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  11. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  12. [Research progresses of the completed pediatrics projects funded by National Natural Science Foundation of China from 2002 to 2006].

    Science.gov (United States)

    Xu, Ling; Hao, Jie; Deng, Min; Xu, Yan-ying

    2009-05-01

    To understand the projects completion and research progresses in pediatrics which were funded by the National Natural Science Foundation of China (NSFC), and evaluate the accomplishment objectively and justly. The completion status of projects in pediatrics funded by department of clinical medicine II from 2002 to 2006 was analysed retrospectively, and important research achievement and outstanding development in some projects were reported. During the period between 2002 and 2006, 420 articles were published, and the average was 8.1 papers per project, which included 56 papers that were published in journals indexed by SCI (the average was 1.1 papers per project). The completion of general project was better than that of "the Young Researchers Fund" and small grant project. Ten post-doctors, 102 doctors and 109 masters were trained. Two projects were awarded with the first grade prize and another 2 with the second grade prize at the provincial and ministerial level, 4 items applied for patent and 1 was granted. These completed projects, which were mainly related to 7 of 12 subspecialties in the field of pediatrics, such as the respiratory disease, nephrology, neurology, cardiology, endocrinology, hematology, neonatology, are the major portion of the application projects and subsidized projects funded by NSFC, and achieved great research progresses. During the period between 2002 and 2006, the 52 completed projects in pediatrics showed difference in the distribution and quality of accomplishment among subspecialties and among types of supported projects; there are some gaps between pediatrics and some other clinical basic subspecialties II, this situation released the research status and problems in development of pediatrics in China. The general projects completion was good, and many projects obtained research achievements, which reflect the leading function of NSFC in pediatric research.

  13. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  14. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  15. An Opportunity to Lead Sustainably: The Benefits and Considerations of Student-Led Green Revolving Fund Projects

    Science.gov (United States)

    Kononenko, Kevin

    2012-01-01

    In recent years, energy- and resource-reduction projects have compelled student leaders to create sustainability projects on campuses across the country. This paper examines the role that students play in green revolving funds, including identification, approval, and management. After speaking with numerous students on a variety of campuses, it is…

  16. Transferring water management knowledge: how actors, interaction and context influence the effectiveness of Dutch-funded projects in Romania

    NARCIS (Netherlands)

    Vinke-de Kruijf, Joanne

    2013-01-01

    Countries around the world face pressing, often similar, water problems. International projects in which knowledge is transferred from one country to another can contribute to solving these problems. Building on the experiences of three Dutch-funded flood risk management projects in Romania, this

  17. A study on the implementation of joint research projects in the field of nuclear technology between Korea and China

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Joon Keuk; Suh, In Suk; Lee, Eui Jin; Kim, Kyoung Pyo; Lee, Jeong Kong; Lee, Byung Wook; Yang, Maeng Ho; Lee, Tae Jun; Chung, Whan Sam; Lee, Man Ki; Lee, Hyo Se; Jun, Byung Jin; Park, Byung Bae; Hong, Young Don; Lee, Chang Woo; Chung, Moon Ki; Sim, Suk Ku; Hwang, Dae Hyun; Oh, Won Zin

    1999-11-01

    In an effort to achieve the objectives, the following provisions were made. First of all, the current status of energy industry was carefully reviewed. An increase of energy consumption, both in industrial and home purposes, implored introduction of nuclear power as an alternative energy production source. Secondly, the current status of China's nuclear development programs together with future prospects was reviewed. Through this review, more effective implementation of nuclear cooperative programs could be devised. Thirdly, China's newly developed nuclear infrastructure was analyzed. The re-structuring of the CNNC was reviewed. Based on this analysis, future cooperative programs could be identified. Lastly, proper strategies for future cooperation between the two countries on a complementary basis were studied. Recommendations for better cooperation programs, particularly for the nuclear policy-making process, were presented. For fruitful cooperation, it is naturally needed match funds to support the implementation of joint projects. It is basically China's idea that Korea provides the funds and China provides manpower. China has a great potential market. The Korean Governments support for key funds for cooperative programs will thus have a sincere meaning. For fruitful cooperation, it is naturally needed match funds to support the implementation of joint projects. It is basically China's idea that Korea provides the funds and China provides manpower. China has a great potential market. The Korean Governments support for key funds for cooperative programs will thus have a sincere meaning. The findings of this study could serve as the database for future nuclear cooperation between the two countries. It is hoped that all local nuclear related organizations in Korea could use some valuable references derived from the study. Information generated from the study could also be used as a benchmark for continued cooperation with China. Various

  18. A study on the implementation of joint research projects in the field of nuclear technology between Korea and China

    International Nuclear Information System (INIS)

    Chung, Joon Keuk; Suh, In Suk; Lee, Eui Jin; Kim, Kyoung Pyo; Lee, Jeong Kong; Lee, Byung Wook; Yang, Maeng Ho; Lee, Tae Jun; Chung, Whan Sam; Lee, Man Ki; Lee, Hyo Se; Jun, Byung Jin; Park, Byung Bae; Hong, Young Don; Lee, Chang Woo; Chung, Moon Ki; Sim, Suk Ku; Hwang, Dae Hyun; Oh, Won Zin

    1999-11-01

    In an effort to achieve the objectives, the following provisions were made. First of all, the current status of energy industry was carefully reviewed. An increase of energy consumption, both in industrial and home purposes, implored introduction of nuclear power as an alternative energy production source. Secondly, the current status of China's nuclear development programs together with future prospects was reviewed. Through this review, more effective implementation of nuclear cooperative programs could be devised. Thirdly, China's newly developed nuclear infrastructure was analyzed. The re-structuring of the CNNC was reviewed. Based on this analysis, future cooperative programs could be identified. Lastly, proper strategies for future cooperation between the two countries on a complementary basis were studied. Recommendations for better cooperation programs, particularly for the nuclear policy-making process, were presented. For fruitful cooperation, it is naturally needed match funds to support the implementation of joint projects. It is basically China's idea that Korea provides the funds and China provides manpower. China has a great potential market. The Korean Governments support for key funds for cooperative programs will thus have a sincere meaning. For fruitful cooperation, it is naturally needed match funds to support the implementation of joint projects. It is basically China's idea that Korea provides the funds and China provides manpower. China has a great potential market. The Korean Governments support for key funds for cooperative programs will thus have a sincere meaning. The findings of this study could serve as the database for future nuclear cooperation between the two countries. It is hoped that all local nuclear related organizations in Korea could use some valuable references derived from the study. Information generated from the study could also be used as a benchmark for continued cooperation with China. Various contacts by experts from

  19. Implementing Global Fund programs: a survey of opinions and experiences of the Principal Recipients across 69 countries.

    Science.gov (United States)

    Wafula, Francis; Marwa, Charles; McCoy, David

    2014-03-24

    Principal Recipients (PRs) receive money from the Global Fund to fight AIDS, Tuberculosis and Malaria (Global Fund) to manage and implement programs. However, little research has gone into understanding their opinions and experiences. This survey set out to describe these, thereby providing a baseline against which changes in PR opinions and experiences can be assessed as the recently introduced new funding model is rolled out. An internet based questionnaire was administered to 315 PRs. A total of 115 responded from 69 countries in Africa, Asia, Eastern Europe and Latin America. The study was conducted between September and December 2012. Three quarters of PRs thought the progress update and disbursement request (PU/DR) system was a useful method of reporting grant progress. However, most felt that the grant negotiation processes were complicated, and that the grant rating system did not reflect performance.While nearly all PRs were happy with the work being done by sub-Recipients (92%) and Fund Portfolio Managers (86%), fewer were happy with the Office of the Inspector General (OIG). Non-government PRs were generally less happy with the OIG's work compared to government PRs.Most PRs thought the Global Fund's Voluntary Pooled Procurement system made procurement easier. However, only 29% said the system should be made compulsory.When asked which aspects of the Global Fund's operations needed improvement, most PRs said that the Fund should re-define and clarify the roles of different actors, minimize staff turnover at its Secretariat, and shorten the grant application and approval processes. All these are currently being addressed, either directly or indirectly, under a new funding model. Vigorous assessments should nonetheless follow the roll-out of the new model to ensure the areas that are most likely to affect PR performance realize sustained improvement. Opinions and experiences with the Global Fund were varied, with PRs having good communication with Fund

  20. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  1. Enhancing public project implementation in Botswana during the NDP 11 period

    Directory of Open Access Journals (Sweden)

    Emmanuel Botlhale

    2017-08-01

    Full Text Available Successful project implementation is critical in development planning. If there is poor project implementation, economic development will be stalled. Generally, public project implementation has a chequered history. This is particularly true in developing countries which are characterised by low levels of project management maturity. The objective of this article is to review public project implementation in Botswana and recommend improvements for the National Development Plan (NDP 11 period (2017/2018-2022/2023. The article used the survey strategy and adopted the descriptive approach. Data collection sources were mixed, that is, primary and secondary sources. It concluded that public projects are either poorly implemented (i.e. not implemented in accordance with the ‘Project Management Triple Constraint’ of cost, time and scope or not implemented at all. Given a constrained revenue envelope post 2008, there is a need for improved project implementation. Amongst others, this calls for professional public project implementation so that NDPs become a reality.

  2. A lead for transvaluation of global nuclear energy research and funded projects in Japan

    International Nuclear Information System (INIS)

    Kiriyama, Eriko; Kajikawa, Yuya; Fujita, Katsuhide; Iwata, Shuichi

    2013-01-01

    Highlights: • Chernobyl accident had limited influence on basic research in nuclear energy. • Budget allocation to R and D and number of published papers have recently decreased. • Citation network analysis revealed reactor safety and fusion as current research trend. • Nuclear energy research policy will change after Fukushima disaster. - Abstract: The decision-making process that precedes the introduction of a new energy system should strive for a balance among human security, environmental safeguards, energy security, proliferation risk, economic risks, etc. For nuclear energy, the Fukushima Daiichi nuclear disaster (Fukushima disaster) has brought forth a strong need for transvaluation of the present technology. Here, we analyzed bibliographic records of publications in nuclear science and technology to illustrate an overview and trends in nuclear energy technology and related fields by using citation network analysis. We also analyzed funding data and keywords assigned for each project by co-occurrence network analysis. This research integrates citation network analysis and bibliometric keyword analysis to compare the global trends in nuclear energy research and characteristics of research conducted at universities and institutes in Japan. We show that the Chernobyl accident had only a limited influence on basic research. The results of papers are dispersed in diverse areas of nuclear energy technology research, and the results of KAKEN projects in Japan are highly influenced by national energy policy with a focus on nuclear fuel cycle for energy security, although KAKEN allows much freedom in the selection of research projects to academic community

  3. The Future of Utility Customer-Funded Energy Efficiency Programs in the United States: Projected Spending and Savings to 2025

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoffman, Ian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Billingsley, Megan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-09-11

    We develop projections of future spending on, and savings from, energy efficiency programs funded by electric and gas utility customers in the United States, under three scenarios through 2025. Our analysis, which updates a previous LBNL study, relies on detailed bottom-up modeling of current state energy efficiency policies, regulatory decisions, and demand-side management and utility resource plans. The three scenarios are intended to represent a range of potential outcomes under the current policy environment (i.e., without considering possible major new policy developments). By 2025, spending on electric and gas efficiency programs (excluding load management programs) is projected to double from 2010 levels to $9.5 billion in the medium case, compared to $15.6 billion in the high case and $6.5 billion in the low case. Compliance with statewide legislative or regulatory savings or spending targets is the primary driver for the increase in electric program spending through 2025, though a significant share of the increase is also driven by utility DSM planning activity and integrated resource planning. Our analysis suggests that electric efficiency program spending may approach a more even geographic distribution over time in terms of absolute dollars spent, with the Northeastern and Western states declining from over 70% of total U.S. spending in 2010 to slightly more than 50% in 2025, with the South and Midwest splitting the remainder roughly evenly. Under our medium case scenario, annual incremental savings from customer-funded electric energy efficiency programs increase from 18.4 TWh in 2010 in the U.S. (which is about 0.5% of electric utility retail sales) to 28.8 TWh in 2025 (0.8% of retail sales). These savings would offset the majority of load growth in the Energy Information Administration’s most recent reference case forecast, given specific assumptions about the extent to which future energy efficiency program savings are captured in that forecast

  4. The future of utility customer-funded energy efficiency programs in the USA. Projected spending and savings to 2025

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, G.L.; Goldman, C.A.; Hoffman, I.M.; Billingsley, M. [Ernest Orlando Lawrence Berkeley National Laboratory, One Cyclotron Road, MS 90R4000, Berkeley, CA 94720-8136 (United States)

    2013-08-15

    We develop projections of future spending on, and savings from, energy efficiency programs funded by electric and gas utility customers in the USA, under three scenarios through 2025. Our analysis, which updates a previous LBNL study, relies on detailed bottom-up modeling of current state energy efficiency policies, regulatory decisions, and demand-side management and utility resource plans. The three scenarios are intended to represent a range of potential outcomes under the current policy environment (i.e., without considering possible major new policy developments). Key findings from the analysis are as follows: (1) By 2025, spending on electric and gas efficiency programs (excluding load management programs) is projected to double from 2010 levels to USD 9.5 billion in the medium case, compared to USD 15.6 billion in the high case and USD 6.5 billion in the low case; (2) Compliance with statewide legislative or regulatory savings or spending targets is the primary driver for the increase in electric program spending through 2025, though a significant share of the increase is also driven by utility DSM planning activity and integrated resource planning; (3) Our analysis suggests that electric efficiency program spending may approach a more even geographic distribution over time in terms of absolute dollars spent, with the Northeastern and Western states declining from over 70 % of total USA spending in 2010 to slightly more than 50 % in 2025, and the South and Midwest splitting the remainder roughly evenly; (4) Under our medium case scenario, annual incremental savings from customer-funded electric energy efficiency programs increase from 18.4 TWh in 2010 in the USA (which is about 0.5 % of electric utility retail sales) to 28.8 TWh in 2025 (0.8 % of retail sales); (5) These savings would offset the majority of load growth in the Energy Information Administration's most recent reference case forecast, given specific assumptions about the extent to which future

  5. Competition for public project funding in a small research system: the case of Estonia

    OpenAIRE

    Jaan Masso; Kadri Ukrainski

    2009-01-01

    The extensive literature that deals with competition for research funding has focused on the mechanisms and outcomes of funding, but has not systematically studied the allocation of funding among research performers across different financing instruments. The analysis of a small research system on the basis of funding volumes disaggregated according to beneficiaries and funding instruments showed a very high and growing degree of market concentration strengthening existing dominant research i...

  6. Low Energy Nuclear Reaction Aircraft- 2013 ARMD Seedling Fund Phase I Project

    Science.gov (United States)

    Wells, Douglas P.; McDonald, Robert; Campbell, Robbie; Chase, Adam; Daniel, Jason; Darling, Michael; Green, Clayton; MacGregor, Collin; Sudak, Peter; Sykes, Harrison; hide

    2014-01-01

    This report serves as the final written documentation for the Aeronautic Research Mission Directorate (ARMD) Seedling Fund's Low Energy Nuclear Reaction (LENR) Aircraft Phase I project. The findings presented include propulsion system concepts, synergistic missions, and aircraft concepts. LENR is a form of nuclear energy that potentially has over 4,000 times the energy density of chemical energy sources. It is not expected to have any harmful emissions or radiation which makes it extremely appealing. There is a lot of interest in LENR, but there are no proven theories. This report does not explore the feasibility of LENR. Instead, it assumes that a working system is available. A design space exploration shows that LENR can enable long range and high speed missions. Six propulsion concepts, six missions, and four aircraft concepts are presented. This report also includes discussion of several issues and concerns that were uncovered during the study and potential research areas to infuse LENR aircraft into NASA's aeronautics research.

  7. Using commodity-indexed financing to fund OPEC/Alaska's development projects

    International Nuclear Information System (INIS)

    Essayyad, Musa

    1992-01-01

    An impediment to the process of economic diversification in OPEC and Alaska is the lack of favourable access to local and international capital markets to finance development projects, particularly mineral resource development. This paper highlights the importance of commodity-indexed bonds, including oil- and gold- indexed bonds, as a financing alternative to supplement the supply shortage of loanable funds from conventional, local and international commercial banks. The indexation concept is discussed, features of different bonds issued to date are contrasted and the benefits and risks for borrowers and investors are highlighted. An analysis is made of the experience of OPEC and Alaska in using commodity-indexed bonds and the feasibility of Alaska and some OPEC countries entering into commodity-linked-financed joint ventures is examined. Future prospects for commodity-linked bonds are explored. Not withstanding the fact that the immediate market timing is unfavourable, the long-term benefits of commodity-indexed securities are recognized. (U.K.)

  8. Year 4 Of The NSF-funded PAARE Project At SC State

    Science.gov (United States)

    Walter, Donald K.; Brittain, S. D.; Cash, J. L.; Hartmann, D. H.; Howell, S. B.; King, J. R.; Leising, M. D.; Mayo, E. A.; Mighell, K. J.; Smith, D. M.

    2012-01-01

    We summarize the progress made through Year 4 of "A Partnership in Observational and Computational Astronomy (POCA)". This NSF-funded project is part of the "Partnerships in Astronomy and Astrophysics Research and Education (PAARE)" program. Our partnership includes South Carolina State University (a Historically Black College/University), Clemson University (a Ph.D. granting institution) and the National Optical Astronomy Observatory. Fellowships provided by POCA as well as recruitment efforts on the national level have resulted in enrolling a total of four underrepresented minorities into the Ph.D. program in astronomy at Clemson. We report on the success and challenges to recruiting students into the undergraduate physics major with astronomy option at SC State. Our summer REU program under POCA includes underrepresented students from across the country conducting research at each of our three institutions. Examples are given of our inquiry-based, laboratory exercises and web- based activities related to cosmology that have been developed with PAARE funding. We discuss our ground-based photometric and spectroscopic study of RV Tauri and Semi-Regular variables which has been expanded to include successful Cycle 2 Kepler observations of a dozen of these objects reported elsewhere at this conference (see D.K. Walter, et.al.). Support for the POCA project is provided by the NSF PAARE program to South Carolina State University under award AST-0750814 as well as resources and support provided by Clemson University and the National Optical Astronomy Observatory. Support for the Kepler observations is provided by NASA to South Carolina State University under award NNX11AB82G.

  9. Training implementation matrix. Spent Nuclear Fuel Project (SNFP)

    International Nuclear Information System (INIS)

    EATON, G.L.

    2000-01-01

    This Training Implementation Matrix (TIM) describes how the Spent Nuclear Fuel Project (SNFP) implements the requirements of DOE Order 5480.20A, Personnel Selection, Qualification, and Training Requirements for Reactor and Non-Reactor Nuclear Facilities. The TIM defines the application of the selection, qualification, and training requirements in DOE Order 5480.20A at the SNFP. The TIM also describes the organization, planning, and administration of the SNFP training and qualification program(s) for which DOE Order 5480.20A applies. Also included is suitable justification for exceptions taken to any requirements contained in DOE Order 5480.20A. The goal of the SNFP training and qualification program is to ensure employees are capable of performing their jobs safely and efficiently

  10. Economic Efficiency and Investment Implementation in Energy Saving Projects

    Directory of Open Access Journals (Sweden)

    Venelin Terziev

    2017-09-01

    Full Text Available Investment in building thermoinsulation is a subject to appraisal for efficiency from the position of discounted cash flows taken specifically by energy saving. The appraisal of investment as optimal is attended by achieving the shortest term for investment implementation, the lowest investment outlays, the maximum total net value of energy savings, the shortest investment payback period. The complex application of the dynamic methods for appraising economic efficiency of an investment – net present value, internal rate of return, profitability index and discounted payback period, involves drawing of particular values which comparison definitely will show if this kind of investment is practically “attractive”. However, the question for significance weight of each of these indicators above in decision making for implementation a particular real investment still remains unsolved. This requires working out a system of criteria, priorities that can determine which of the indicators for economic efficiency of specific investment project will have the highest significance.

  11. Implementation of the e-Bug Project in Greece.

    Science.gov (United States)

    Gennimata, Dimitra; Merakou, Kyriakoula; Barbouni, Anastasia; Kremastinou, Jenny

    2011-06-01

    The e-Bug pack and web site educational material has been translated and adapted to the Greek language and educational background, and implemented throughout Greece as a supplementary educational resource in elementary and junior high schools. Elementary and junior high school teachers in Greece have actively participated in the development of the e-Bug educational resource and supported the implementation of all e-Bug activities. Dissemination to all key national stakeholders has been undertaken, and endorsement has been obtained from educational and medical associations, societies and institutions. Independent evaluation has been carried out, as part of dissertation thesis projects, for postgraduate studies. The e-Bug educational resource provides all the essentials for the dissemination of good health behaviours in hygiene, monitoring the spread of infection and the prudent use of antibiotics, to the youth of this country. Its contribution is expected to be evident in the next adult generation.

  12. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  13. Implementing local projects to reduce the stigma of mental illness.

    Science.gov (United States)

    Warner, Richard

    2008-01-01

    This editorial describes strategies used and the lessons learned in implementing two local anti-stigma projects. The WPA Programme to Reduce Stigma and Discrimination Because of Schizophrenia established projects to fight stigma in 20 countries, using social-marketing techniques to enhance their effectiveness. First steps at each site were to establish an action committee and conduct a survey of perceived stigma. Based on survey results, the action committees selected a few homogeneous and accessible target groups, such as employers, and criminal justice personnel. Messages and media were selected, tested, and refined. Guidelines are provided for setting up a consumer (service-user) speakers' bureau and for establishing a media-watch organization, which can lobby news and entertainment media to exclude negative portrayals of people with mental illness. Improvements in knowledge about mental illness were effected in high school students and criminal justice personnel. Positive changes in attitude towards people with mental illness were achieved with high school students, but were more difficult to achieve with police officers. Local antistigma projects can be effective in reducing stigma and relatively inexpensive. The involvement of consumers is important in working with police officers. Project organizers should be on the lookout for useful changes that can become permanent.

  14. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  15. RESEARCH ON PROBLEMS WITH PROJECTS AND PARTNERSHIPS THAT PUBLIC INSTITUTIONS IN THE CENTRE REGION FACED IN ACCESSING EUROPEAN FUNDS

    Directory of Open Access Journals (Sweden)

    DUMITRASCU DANUT

    2012-12-01

    Full Text Available European project management is the main filed of the article. Assuming a connection between the degree of absorption of European funds and the degree of maturity of the Romanian society in terms of project management, the article seeks to identify the negative factors on accessing and carrying out European projects. The identified problem is a low degree of absorption of European funds in Romania, and the main objective of the research is to identify the problems faced by the public institutions in the Centre Region in accessing European funds and also the causes that led to the low absorption of European funds. This article’s research is based on a preliminary analysis performed by the authors on the rate of accessing of European funds published in the article called “The current state of European funds absorption through funding programmes – measure of the Romanian performances in the project management practice”. The conclusion of this article was a low rate of absorption of European funds in Romania, a fact that reveals a poor practice of the theory on project management. This article identifies part of the causes of this situation by identifying a part of the problems that stood in the way of beneficiaries of European funds The qualitative and quantitative research methods are used in combination in the research. The investigation has however a highly quantitative character, the purpose of the qualitative research being to provide the prerequisites for achieving the quantitative research. The interview-based qualitative research enabled the researcher to get acquainted with the subjects’ problems related to the theme of investigation, the causes that have generated these problems. This preliminary investigation to the questionnaire-based research aims to provide information that would help the researcher prepare the questionnaire, so that the questions allow getting the most comprehensive information to

  16. TEMPO: an ESA-funded project for uncovering significant features of the South Atlantic Anomaly

    Science.gov (United States)

    Pavón-Carrasco, F. Javier; De Santis, Angelo

    2016-04-01

    In this work we provide the last results of the ESA (European Space Agency) funded project TEMPO ("Is The Earth's Magnetic field POtentially reversing? New insights from Swarm mission"). The mail goal of this project is to analyse the time and spatial evolution of one of the most important features of the present geomagnetic field, i.e. the South Atlantic Anomaly (SAA). The region covered by this anomaly is characterized by values of geomagnetic field intensity around 30% lower than expected for those latitudes and extends over a large area in the South Atlantic Ocean, South America, South Africa and the Eastern Pacific Ocean. This large depression of the geomagnetic field strength has its origin in a prominent patch of reversed polarity flux in the Earth's outer core. The study of the SAA is an important challenge nowadays not only for the geomagnetic and paleomagnetic community, but also for other areas focused on the Earth Observation due to the protective role of this potential field against the charged particles forming the solar wind. A further increase of the SAA surface extent could have dramatic consequences for human health and technologies because a larger number of solar charged particles could reach the Earth's surface.

  17. [Characteristics and innovation in projects of ethnomedicine and ethnopharmacology funded by National Natural Science Foundation of China].

    Science.gov (United States)

    Han, Li-wei

    2015-09-01

    The overall situation of projects of ethnomedicine and ethnopharmacology funded by the National Natural Science Foundation of China (NSFC) since 2008 has been presented in this paper. The main source of characteristics and innovation of the funded projects were summarized, which may come from several aspects, such as the ethnomedical theories, the dominant diseases of ethnomedicine, special diseases in ethnic minorities inhabited areas, unique ethnomedical therapy, special methods for applying medication, endemic medicinal materials in ethnic minorities inhabited areas, same medicinal materials with different applications. Examples have been provided to give references to the applicants in the fields of ethnomedicine and ethnopharmacology.

  18. Unliquidated Obligations for Air Force-Funded Projects Administered by The Naval Facilities Engineering Command

    National Research Council Canada - National Science Library

    2001-01-01

    ... consolidated financial statements. The Air Force Audit Agency requested us to assist in its review of the Statement of Budgetary Resources for the Air Force General Fund by reviewing unliquidated obligations for Air Force-funded...

  19. Implementing Kernel Methods Incrementally by Incremental Nonlinear Projection Trick.

    Science.gov (United States)

    Kwak, Nojun

    2016-05-20

    Recently, the nonlinear projection trick (NPT) was introduced enabling direct computation of coordinates of samples in a reproducing kernel Hilbert space. With NPT, any machine learning algorithm can be extended to a kernel version without relying on the so called kernel trick. However, NPT is inherently difficult to be implemented incrementally because an ever increasing kernel matrix should be treated as additional training samples are introduced. In this paper, an incremental version of the NPT (INPT) is proposed based on the observation that the centerization step in NPT is unnecessary. Because the proposed INPT does not change the coordinates of the old data, the coordinates obtained by INPT can directly be used in any incremental methods to implement a kernel version of the incremental methods. The effectiveness of the INPT is shown by applying it to implement incremental versions of kernel methods such as, kernel singular value decomposition, kernel principal component analysis, and kernel discriminant analysis which are utilized for problems of kernel matrix reconstruction, letter classification, and face image retrieval, respectively.

  20. A Mixed Methods Approach to Evaluate Partnerships and Implementation of the Massachusetts Prevention and Wellness Trust Fund

    Directory of Open Access Journals (Sweden)

    Rebekka M. Lee

    2018-06-01

    Full Text Available Background: Strong partnerships are critical to integrate evidence-based prevention interventions within clinical and community-based settings, offering multilevel and sustainable solutions to complex health issues. As part of Massachusetts' 2012 health reform, The Prevention and Wellness Trust Fund (PWTF funded nine local partnerships throughout the state to address hypertension, pediatric asthma, falls among older adults, and tobacco use. The initiative was designed to improve health outcomes through prevention and disease management strategies and reduce healthcare costs.Purpose: Describe the mixed-methods study design for investigating PWTF implementation.Methods: The Consolidated Framework for Implementation Research guided the development of this evaluation. First, the study team conducted semi-structured qualitative interviews with leaders from each of nine partnerships to document partnership development and function, intervention adaptation and delivery, and the influence of contextual factors on implementation. The interview findings were used to develop a quantitative survey to assess the implementation experiences of 172 staff from clinical and community-based settings and a social network analysis to assess changes in the relationships among 72 PWTF partner organizations. The quantitative survey data on ratings of perceived implementation success were used to purposively select 24 staff for interviews to explore the most successful experiences of implementing evidence-based interventions for each of the four conditions.Conclusions: This mixed-methods approach for evaluation of implementation of evidence-based prevention interventions by PWTF partnerships can help decision-makers set future priorities for implementing and assessing clinical-community partnerships focused on prevention.

  1. Direct facility funding as a response to user fee reduction: implementation and perceived impact among Kenyan health centres and dispensaries.

    Science.gov (United States)

    Opwora, Antony; Kabare, Margaret; Molyneux, Sassy; Goodman, Catherine

    2010-09-01

    There is increasing pressure for reduction of user fees, but this can have adverse effects by decreasing facility-level funds. To address this, direct facility funding (DFF) was piloted in Coast Province, Kenya, with health facility committees (HFCs) responsible for managing the funds. We evaluated the implementation and perceived impact 2.5 years after DFF introduction. Quantitative data collection at 30 public health centres and dispensaries included a structured interview with the in-charge, record reviews and exit interviews. In addition, in-depth interviews were conducted with the in-charge and HFC members at 12 facilities, and with district staff and other stakeholders. DFF procedures were well established: HFCs met regularly and accounting procedures were broadly followed. DFF made an important contribution to facility cash income, accounting for 47% in health centres and 62% in dispensaries. The main items of expenditure were wages for support staff (32%), travel (21%), and construction and maintenance (18%). DFF was perceived to have a highly positive impact through funding support staff such as cleaners and patient attendants, outreach activities, renovations, patient referrals and increasing HFC activity. This was perceived to have improved health worker motivation, utilization and quality of care. A number of problems were identified. HFC training was reportedly inadequate, and no DFF documentation was available at facility level, leading to confusion. Charging user fees above those specified in the national policy remained common, and understanding of DFF among the broader community was very limited. Finally, relationships between HFCs and health workers were sometimes characterized by mistrust and resentment. Relatively small increases in funding may significantly affect facility performance when the funds are managed at the periphery. Kenya plans to scale up DFF nationwide. Our findings indicate this is warranted, but should include improved training

  2. 78 FR 78486 - Notice of Funding Availability for Resilience Projects in Response to Hurricane Sandy

    Science.gov (United States)

    2013-12-26

    ... service. This resilience funding is intended to protect public transportation infrastructure that has been... infrastructure after a future major storm or natural disaster. Furthermore, the activities funded under this... billion to other agencies to fund programs authorized under titles 23 and 49, United States Code, in order...

  3. Survey to promote an action implemented jointly project; Kyodo jisshi katsudo project suishin chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the 1st (1995) conference of the nations which concluded the Framework Convention on Climate Change, decided on was a trial implementation of an action implemented jointly (AIJ) project with developing countries on the voluntary basis. In the Asia region, emission of greenhouse effect gas is remarkably increasing in accordance with rapid development of economy, and it is important to appropriately support through this project both economic development and energy demand in Asia. Taking the circumstance into consideration, the survey was conducted to contribute to activating the AIJ Japan Program. As the AIJ of leading developed countries, recognized were 25 (U.S.), 6 (Holland), 8 (Germany), 2 (Norway) projects. As to the AIJ in Southeast Asia, China and India, Indonesia is actively participating in the project, but others less actively. Concerning the project needs in every country, heightening of power plant efficiency, enhancement of efficiency in the transportation sector, new energy utilization, recovery of methane gas, etc. acquire a priority. 21 figs., 31 tabs.

  4. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    Science.gov (United States)

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  5. Scenarios for the implementation of daytime running lights in the European Union : study in the framework of a European Commission project, Work Package 4.

    NARCIS (Netherlands)

    Commandeur, J.J.F. Mathijssen, M.P.M. Elvik, R. Janssen, W. & Kallberg, V.-P.

    2004-01-01

    This report is the last part of the documentation of a project funded by the European Commission, designed to assess the effects of Daytime Running Lights (DRL) and possible strategies for implementing the use of DRL in the European Union (EU). The general objective of the present report is to

  6. [Analysis of projects funded by NSFC in field of processing Chinese materia medica in recent five years].

    Science.gov (United States)

    Chen, Lei; Xia, Xing; He, Bo-sai; Hah, Li-wei

    2015-05-01

    The general situation of the approved and concluded projects of National Natural Science Foundation of China in the field of processing Chinese Materia Medica in recent five years has been reviewed. The progresses and achievements of some projects have been summarized in accordance with research area such as the processing principle, the processing technology, quality evaluation, toxicity and safety evaluation, etc. The researchers and project support units of the funded projects have been analyzed, and the problems of the applications have been also summarized.

  7. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  8. Waste-to-energy technologies and project implementation

    CERN Document Server

    Rogoff, Marc J

    2011-01-01

    This book covers in detail programs and technologies for converting traditionally landfilled solid wastes into energy through waste-to-energy projects. Modern Waste-to-Energy plants are being built around the world to reduce the levels of solid waste going into landfill sites and contribute to renewable energy and carbon reduction targets. The latest technologies have also reduced the pollution levels seen from early waste incineration plants by over 99 per cent. With case studies from around the world, Rogoff and Screve provide an insight into the different approaches taken to the planning and implementation of WTE. The second edition includes coverage of the latest technologies and practical engineering challenges as well as an exploration of the economic and regulatory context for the development of WTE.

  9. How sustainable is Japan's foreign aid policy? An analysis of Japan's official development assistance and funding for energy sector projects

    Science.gov (United States)

    Yamaguchi, Hideka

    Japan has adopted a sustainable development strategy since the late 1980s in the effort to address social and environmental damages caused by past Japan-funded projects in partner nations. Even after about a decade and a half of the policy implementation, however, there are few reports which critically examine effects of the adoption of the idea of sustainable development. This dissertation evaluates Japan's foreign aid policy to determine the extent to which new revisions of aid policy have improved the environmental sustainability of the policy. This dissertation reviews the mainstream idea of sustainable development (also known as the sustainable development paradigm in this dissertation) to reveal the nature of the idea of sustainable development that Japan's foreign aid policy depends on. A literature review of two development discourses---modernization theory and ecological modernization theory---and three types of critiques against the sustainable development paradigm---focused on adverse impacts of modern science, globalization, and environmental overuse---reveals core logics of and problems with the sustainable development paradigm. Japan's foreign aid policy impacts on energy sector development in recipient countries is examined by means of a quantitative analysis and a qualitative analysis. Specifically, it examines the effect of Japan's ODA program over fifteen years that proposed to facilitate sustainable development in developing countries. Special emphasis is given to investigation of ODA disbursements in the energy sector and detailed case studies of several individual energy projects are performed. The dissertation discovers that the sustainable development paradigm guiding Japan's ODA has little capacity to accomplish its goals to bring about social and ecological improvement in developing countries. This dissertation finds three fundamental weaknesses in Japanese ODA policy on energy sector development as well as the sustainable development

  10. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  11. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  12. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  13. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  14. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  15. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  16. Innovative Startup-Projects: Experience, Evaluation, Implementation Contradictions

    Directory of Open Access Journals (Sweden)

    Inshakov Maksim Olegovich

    2015-09-01

    Full Text Available Innovative companies in the conditions of global post-crisis economic recovery and increased economic activity become again a promising area for investments of large investment and venture capital funds, venture divisions of large transnational corporations, business angels and other private investors. This is confirmed by the data on the increase in the volume of venture capital market in the US and Europe and on a significant increase in the cost of the leading foreign and Russian start-up companies which are rated as of 2014 in the present article. The comparative analysis of the leading Russian and foreign start-ups showed the prevalence of companies engaged in the field of IT-Internet-Mobile and focused on the provision of various kinds of innovative services to consumers among the foreign participants of the rating. Among Russian startups-winners the companies of technological orientation (biological, medical, and “clean” technologies dominate. They reflect the increasing importance of start-ups in the innovative development of the Russian economy. Participation in such competitions and ratings is a favorable factor of promoting start-ups, increasing awareness of potential investors and consumers of start-up products. The importance of start-ups formation and the development of effective regional and national innovation systems update the studies related to the identification of the fundamental contradictions in the activities of Russian start-ups and to the development of recommendations for their resolution. The article identifies the key issues of economic, organizational, informational and marketing character causing the collapse of start-up projects in the Russian economy in modern conditions.

  17. The Implementation of Enrollment Management at Two Public Universities Experiencing Demographic and Funding Challenges

    Science.gov (United States)

    Lee, Stephen

    2010-01-01

    The purpose of this study was to evaluate the implementation of enrollment management at two public universities. The theoretical framework was conceptual and centered on the effectiveness of the implementation process as a pivotal factor in the development of a comprehensive enrollment management operation. This multi-site case study included 14…

  18. ROMANIA’S FACTS ABOUT INTERNAL CONTROL ENVIRONMENT OF EUROPEAN SOCIAL FUND FINANCED PROJECTS

    Directory of Open Access Journals (Sweden)

    Dogar Cristian

    2012-07-01

    Full Text Available The malfunctioning of internal control system of European Social Fund (ESF financed interventions may prejudice the sound financial management principle. Incorporating COSO principles in the beneficiary’s internal control systems may provide some warranties about compliance to the above mentioned principle as described in the EC Regulation 1605-2002. This study aims to explore some facts in actual internal control environment, as a base for future improvements of Romanian ESF beneficiary’s internal control systems ESF financed interventions covers a large range of costs for implementing labor market related services. But supporting costs according to the sound financial management principle calls for best value for money in real and legal operations. Without some specifics from the donor or a mutual accepted best practice model, most of the ESF beneficiaries are reporting their efforts to actual researches and specialized literature regarding internal control system implementation in services. This study was realized in April 2012 by applying an investigation instrument, an on-line questionnaire collecting both opinions and factual data as well to a number of 962 members of a practice community for ESF interventions implementation. This technique was used to test hypotheses regarding the premises existence for a future improvement of the existing internal control system model. 100 members of this community: managers, accountants, auditors financial responsible and other team members answered anonymously, revealing a real concern for internal control, providing as well a different side image for this. Analyzing all stakeholder answers, we may consider that our hypothesis is correct and there is a real need for internal control environment improvements. This study is a part of a larger research “New models of the accounting and internal control systems of ESF financed interventions in Romania”, addressing a qualitative

  19. Financing CHP Projects at Wastewater Treatment Facilities with Clean Water State Revolving Funds

    Science.gov (United States)

    This factsheet provides information about CHP at wastewater treatment facilities, including applications, financial challenges, and financial opportunities, such as the Clean Water State Revolving Fund.

  20. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Science.gov (United States)

    2010-07-01

    ... who teaches modern foreign languages or area studies in an institution of higher education; (2) Is a... institution of higher education, who plans a teaching career in modern foreign languages or area studies... 34 Education 3 2010-07-01 2010-07-01 false Who is eligible to participate in projects funded under...

  1. Are we investing wisely? A systematic analysis of nationally funded antimicrobial resistance projects in Republic of Korea, 2003-2013.

    Science.gov (United States)

    Ryu, Sukhyun; Head, Michael G; Kim, Bryan I; Hwang, Juchul; Cho, En-Hi

    2016-09-01

    From 2003 to 2013, South Korea has conducted the National Antimicrobial Resistance Safety Control Program (NARSCP). The purpose of the current study was to systematically review national antimicrobial resistance (AMR) research trends and to provide guidance on future allocation of research funding to enable a comprehensive approach in AMR control. This study collected project reports related to AMR published by the Ministry of Food and Drug Safety, the Ministry of Health and Welfare and the Korea Centers for Disease Control and Prevention between 2003 and 2013. These reports were analysed by topics based on the AMR action plan of the World Health Organization (WHO), period of study, categories along the research pipeline and types of receiving institution. A total of 198 project reports were included, with total funding of US$18.3 million. Mean funding per award was US$92,750, with a median of US$71,714. Among the WHO-suggested criteria, the basic microbial research and surveillance sector accounts for 143 (72.2%) of all awards. Yearly project funding increased from US$961,476 in 2003 to US$1,553,294 in 2013. Operational research was 61.5% and product development was 0.7% of the basic microbial research and surveillance sector. By institution, academia received 145 awards (73.2%). During progress of the NARSCP, total research funding increased significantly, but most awards were focused on understanding the overall picture of the nationwide AMR status. More balanced funding is needed, and encouraging active participation of private and international sectors is also required in reducing AMR. Copyright © 2016 International Society for Chemotherapy of Infection and Cancer. Published by Elsevier Ltd. All rights reserved.

  2. A funding model for health visiting (part 2): impact and implementation.

    Science.gov (United States)

    Cowley, Sarah

    2007-12-01

    This is the second of two papers offering the information required to work out how to fund a health visiting service. The first paper gave the basic requirements, while this one identifies and explains the separate components of the service along with issues of scope and skillmix. In this way, it starts to describe the programmes embedded within a generic health visiting service, which is helpful in terms of what might be expected in terms of impact and outcomes. These are described with reference to the new Public Service Agreement targets and other relevant policy.

  3. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    Science.gov (United States)

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  4. [Analysis of the application and funding projects of National Natural Science Foundation of China in the field of burns and plastic surgery from 2010 to 2016].

    Science.gov (United States)

    Zhang, Z C; Dou, D; Wang, X Y; Xie, D H; Yan, Z C

    2017-02-20

    We analyzed the data of application and funding projects of the National Natural Science Foundation of China (NSFC) during 2010-2016 in the field of burns and plastic surgery and summarized the NSFC funding pattern, the research hotspots, and weaknesses in this field. The NSFC has funded 460 projects in the field of burns and plastic surgery, with total funding of RMB 227.96 million. The scientific issues involved in the funding projects include orthotherapy against malformations, wound repair, basic research of burns, skin grafting, scars prevention, and regeneration of hair follicle and sweat glands. The research techniques involved in the funding projects are diversified. NSFC plays an important role in the scientific research and talents training in the field of burns and plastic surgery.

  5. Seismic microzoning projects and their implementation in Venezuela

    Science.gov (United States)

    Schmitz, M.; Cano, V.; Olbrich, F.; Vallee, M.; Morales, C.; Arreaza, A.; Mendes, K.; Klarica, S.; Alvarez Gomez, J.; Aray, J.; Vielma, J.; Pombo, A.; Diaz, J.; Grupo de trabajo

    2013-05-01

    Site effects have been recognized to play an important role in damage distribution of destructive earthquakes. These effects have been observed in Venezuela especially during the 1967 Caracas earthquake, when 4 buildings with 10 and more storeys during the Caracas 1967 earthquake collapsed, and a big number of them in the same deep sediment area have been seriously damaged. This motivated the development of studies regarding the subsurface configuration of Caracas and Barquisimeto during the last decade, with a seismic microzoning project realized in both cities from 2005 to 2009. The main results of this project were the development of design response spectra for the different microzones within the sedimentary basin, as well as estimates of landslide hazard. Implementation of the results in municipality ordinances is actually discussed with local authorities. They are aimed to address mitigation for new constructions by the application of the specific design spectra, for existing buildings via evaluation and retrofitting strategies, and for slope areas (informal, as well as formal developments) due to the identification of areas that may not be developed or require detailed studies of slope stabilities. Since then, seismic microzoning studies were started in Cumaná, Guarenas/Guatire and Lara state, and within a broader context of integrated risk management, which includes flooding, landslide and technological risks, in Mérida, Valencia, Maracay, Barcelona/Puerto La Cruz and Valle de la Pascua. The projects are coordinated by the Venezuelan Foundation for Seismological Research (FUNVISIS) in cooperation with local universities. Efforts are done to unable local researchers to apply the methodologies in other cities as Valera, Trujillo, Boconó, San Cristóbal and Tucacas. A unified seismic hazard map as input motion to these studies is actually in development. Depending on the local characteristics, building inventory and vulnerability analysis are done for risk

  6. Socio-economic drivers in implementing bioenergy projects

    International Nuclear Information System (INIS)

    Domac, J.; Richards, K.; Risovic, S.

    2005-01-01

    Within the international community there is considerable interest in the socio-economic implications of moving society towards the more widespread use of renewable energy resources. Such change is seen to be very necessary but is often poorly communicated to people and communities who need to accept such changes. There are pockets of activity across the world looking at various approaches to understand this fundamental matter. Typically, socio-economic implications are measured in terms of economic indices, such as employment and monetary gains, but in effect the analysis relates to a number of aspects which include social, cultural, institutional, and environmental issues. The extremely complex nature of bioenergy, many different technologies involved and a number of different, associated aspects (socio-economics, greenhouse gas mitigation potential, environment, ?) make this whole topic a complex subject. This paper is primarily a descriptive research and review of literature on employment and other socio-economic aspects of bioenergy systems as drivers for implementing bioenergy projects. Due to the limited information, this paper does not provide absolute quantification on the multiplier effects of local and or national incomes of any particular country or region. The paper intends to trigger a more in-depth discussion of data gaps, potentials, opportunities and challenges. An encouraging trend is that in many countries policy makers are beginning to perceive the potential economic benefits of commercial biomass e.g. employment/earnings, regional economic gain, contribution to security of energy supply and all others

  7. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2013-01-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences and lessons learned with policymakers, project developers and stakeholders, with the objective to inform forest project and strategy development. It presents experiences and advice on the risks, costs and revenues of forest projects, thereby informing not only the development of future REDD+ initiatives but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private financial institutions and comparable with other investment opportunities. It is therefore important to include robust analysis of the operations business case and its financial attractiveness to commercial investors, early in the design process. As for the economics of forest and forest carbon projects, it appears that REDD+ payments alone, especially at current prices, will not deliver the revenues that cover all expenses of transparent and long-term mitigation of forest carbon emissions. Instead the findings underline the importance of building up forest operations which effectively manages risk and delivers several revenue streams. These findings are aligned with the advocacy efforts of UNEP and the UN-REDD Programme on multiple benefits and the combination of various funding and

  8. The effects of anticipated funding changes on maternal and child health projects: a case study of uncertainty.

    Science.gov (United States)

    Schlesinger, E R; Skoner, M M; Trooskin, E D; Markel, J R; North, A F

    1976-04-01

    A questionnaire survey of Title V special projects--Maternal and Infant Care (M&I), Comprehensive Care for Children and Youth (C&Y), Neonatal Intensive Care and Children's Dental Care--indicated that the anticipated change from federal project grants to state formula grants caused anxiety among project directors, low morale and high turnover in project staff, difficulty in filling staff positions, and anticipation of service reductions. These effects were much more prevalent and severe in projects which could realistically be expected to suffer budget cuts as a result of the shift in funding method. Despite the widespread anxiety, low morale and adverse effects reported by program directors, there was no reduction in the number of patients served, the scope of services offered, or the number of staff employed.

  9. Active Aging and Elderly's Quality of Life: Comparing the Impact on Literature of Projects Funded by the European Union and USA.

    Science.gov (United States)

    Kirilov, I; Atzeni, M; Perra, A; Moro, D; Carta, M G

    2018-01-01

    The objective of this research is to verify whether European projects on Active Aging (AA) and Elderly Quality of Life (Qol) funded by the Seventh Framework Programme (FP7) produce an impact on literature similar to projects funded by the National Health Institute (NHI) of the United States on international literature using well-known bibliometric indicators. This effort may be useful in developing standardized and replicable procedures. Fifteen randomly selected projects on AA and Elderly Qol concluded in August 2017 and funded by FP7 were compared to similar projects funded by the US NHI with reference to papers published (Scopus and Scholar), papers published in Q1 journals, and the number of citations of the papers linked to the projects. In all the indicators considered, the European projects showed no difference with the US NHI projects. The EU-funded AA and Qol Elderly projects have an impact on scientific literature comparable to projects funded in the United States by the NHI Agency.Our results are consistent with the data on general medical research, which indicates that, European research remains at a high level of competitiveness.In this experimental study, our methodology appeared to be convincing and reliable and it could be applied to the extent of the impact of more extensive research areas.Our research did not evaluate the relationship between funding required by research and scientific productivity.

  10. Function of Management Consultation in Implementation of ERP Project

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    ERP(enterprise resource planning) is a huge and com pl ex system engineering which costs a great lot of fund and manpower. It is a refo rm in the enterprise management mode, management idea and management method whi ch needs mass fund import, with long period, full of risk, hard to perform and can't show its effects at once. The essence of the enterprise performing in ERP system is to run a "management engineering", which involves integration of opera tion process. The integration will touch business ...

  11. IDENTIFICATION OF EXAMPLES OF GOOD PRACTICE IN ABSORPTION OF STRUCTURAL FUNDS, CASE STUDY PROJECT "CHRISTIAN DAY CENTER"

    Directory of Open Access Journals (Sweden)

    CEAUSESCU IONUT

    2016-08-01

    Full Text Available The main purpose of this study is to capture the practical point of view, the main issues in examples of best practices in the application for funding for the project "Christian Day Center- Support for young people and adults with disabilities" project benefited the City Council Târgu Jiu, is a project which was realized in the Regional Operational Programme, Priority Axis 3 DMI 3.2 - "Rehabilitation / modernization / development and equipping of social services", the total value of the project was 3,373,722.72 lei, of which non-repayable funding over was worth 2,592,251.08 lei. Through its general objective, the project "Day Center Christian - Support for young people and adults with disabilities" aims to contribute to improving the quality of infrastructure for social services by ensuring equal access of citizens of Tg-Jiu such services. Christian Day Center- support for young people and adults with physical disabilities, musculoskeletal, neuro, somatic and visual has already proposed to the idea of the project, to be a center which will ensure the social inclusion of these vulnerable and contribute to increasing the quality of life, improve communication and information on the rights and benefits of social services to improve the management and organization of the system of providing social services and facilitating the participation of all stakeholders in the development of social services.

  12. 75 FR 78725 - Recreational Boating Safety Projects, Programs and Activities Funded Under Provisions of the...

    Science.gov (United States)

    2010-12-16

    ...: Funding was provided for this program which provides full marketing, media, public information, and... media and boating safety information at http://www.uscgboating.org for a worldwide audience. It covers a...

  13. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  14. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    Science.gov (United States)

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  15. Implementation of Improved Management Control of Aviation Depot Level Repairable Funds

    Science.gov (United States)

    1986-12-01

    for comparing and testing. Pf ter Drucker states that ". . . control is an ambiguous word. It means the abiliti to direct oneself and one’s work. It...Frequency 50 LIST OF REFERENCES 1. Drucker , Peter F., The Practice of Management , Harper and Brothers Publishers, 1954. 2. Terry, George R., Principles of...NAVAL POSTGRADUATE SCHOOLMonterey, California 0- 6~~VI E1B9 87THESIS I IMPLEMENTATION OF IMPROVED MANAGEMENT CONTROL OF AVIATION DEPOT LEVEL

  16. Effective and efficient implementation of alternative project delivery : research summary.

    Science.gov (United States)

    2017-05-01

    Alternative project delivery (APD) methods such as Design Build (DB) and Construction Manager at Risk (CMAR), are used by state departments of transportation to improve the efficiency and effectiveness of project delivery. The Maryland Department of ...

  17. MARKETING STRATEGIES IN THE DEVELOPMENT AND IMPLEMENTATION OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-05-01

    Full Text Available The article is devoted to marketing in project management, as the scope of activities aimed at improving the quality characteristics of the project for its further effective market promotion in an increasingly competitive environment. Particular attention is paid to marketing strategies during the development and subsequent sale of the project to the investor. The problem of effective combination of marketing strategies and project management process is being solved.

  18. Implementing GEOSS Goals in Mesoamerica through the SERVIR Project

    Science.gov (United States)

    Hardin, D. M.; Graves, S.; Sever, T.; Irwin, D.

    2006-05-01

    On February 16, 2005 a ten-year plan for implementation of the Global Earth Observation System of Systems (GEOSS) was adopted by the European Commission and nearly 60 governments worldwide. The plan was the culmination of an effort initiated in 2002 when the World Summit on Sustainable Development highlighted the urgent need for coordinated observations relating to the state of the Earth. The plan defined nine societal benefit areas that could be addressed with a coordinated global observation system. Mesoamerica is a prime example of a multi-national region with natural and human induced stresses that can benefit from information provided by observation systems as defined by GEOSS. The region is severely threatened by extensive deforestation, illegal logging, water pollution, and uncontrolled slash and burn agriculture. Additionally, Mesoamerica's distinct geology and geography result in disproportionate vulnerability of its population to natural disasters such as earthquakes, hurricanes, drought, and volcanic eruptions. In Mesoamerica the SERVIR* project has achieved early success in many of the GEOSS societal benefit areas. Overcoming roadblocks to coordination and data sharing between countries, organizations and disciplines SERVIR is providing environmental monitoring and decision support products and applications that directly map to several GEOSS societal benefit areas. Mesoamerica is particularly prone to natural disasters. There are many instances such as Hurricane Mitch in 1998 that resulted in the death of thousands of people. As recently as 2005, natural disasters took the lives of 1,500 people when Hurricane Stan struck Guatemala, El Salvador, Mexico and Nicaragua. Within 48 hours of landfall data products were generated by the SERVIR team and SERVIR partners and made available via the SERVIR website to disaster response teams in Guatemala and El Salvador. In the true spirit of GEOSS, data from a variety of Earth observing satellites such as RADARSAT

  19. The implementation of sustainability principles in project management

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Debby Goedknegt

    2012-01-01

    It is becoming clear that the project management practice must embrace sustainability in order to develop into a 'true profession' (Silvius et al., 2012). In project management, sustainability can be gained in both the product of the project and in the process of delivering the product. (Gareis et

  20. 33 CFR 385.13 - Projects implemented under additional program authority.

    Science.gov (United States)

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  1. Implementation of Work Package 7 (WP7) - a condition for achieving the CORONA project goals

    International Nuclear Information System (INIS)

    Tsakov, T.; Ilieva, M.; Miteva, R.

    2013-01-01

    Project CORONA 'Construction of a regional center for WWER competencies and nuclear technology' is a three year project co-funded by the European Commission coordinated by Kozloduy NPP and another 10 participants from eight countries. Work Package 7 (WP7) - 'Assessment and recommendations for sustainable development of regional Center for WWER nuclear technology and competence', aims to summarize and analyzing the results of the implementation of activities within the defined work packages: WP1 - Identification of training needs for all target groups; WP2 - Creating a scheme for training of nuclear scientists and researchers with the technology of WWER; WP3 - Create a schedule for training of non-nuclear specialists and subcontractors with the basics of technology WWER; WP4 - Establishing a scheme for specialized training of students with technology WWER; WP5 - Creation of a scheme for implementing and enhancing safety culture; WP6 - Creating a portal for knowledge management technology with WWER; Analysis of the results of the activity should provide conditions for creation of conditions for continued development of a regional center for obtaining and maintaining the knowledge of professionals applying WWER technology by integrating the experience of different organizations, research centers and the WWER units, in the process of creating frames for maintenance and development of this technology. By establishing the regional center will be unified schemes for qualification of personnel applying WWER technology in accordance with the standards of the International Atomic Energy Agency and the generally accepted criteria for education and vocational training in the European Community. Integrating the experience of different organizations NPP and research centers will enable to define schemes and programs for continuous education and training to be recognized in the EU from around the nuclear sector and the European Credit System for Vocational

  2. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  3. Project implementation : classification of organic soils and classification of marls - training of INDOT personnel.

    Science.gov (United States)

    2012-09-01

    This is an implementation project for the research completed as part of the following projects: SPR3005 Classification of Organic Soils : and SPR3227 Classification of Marl Soils. The methods developed for the classification of both soi...

  4. Alcolocks : factors influencing implementation, participation and compliance : literature review contributed to the EU project Alcolock Implementation in the European Union.

    NARCIS (Netherlands)

    Mathijssen, M.P.M.

    2007-01-01

    In 2004-2005, a series of alcolock field trials were conducted in four European countries, in the framework of the EU research project Alcolock Implementation in the European Union. This project was granted by the European Commission, Directorate-General for Energy and Transport (DG-TREN). As part

  5. Arctic Research Mapping Application (ARMAP): visualize project-level information for U.S. funded research in the Arctic

    Science.gov (United States)

    Kassin, A.; Cody, R. P.; Barba, M.; Escarzaga, S. M.; Score, R.; Dover, M.; Gaylord, A. G.; Manley, W. F.; Habermann, T.; Tweedie, C. E.

    2015-12-01

    The Arctic Research Mapping Application (ARMAP; http://armap.org/) is a suite of online applications and data services that support Arctic science by providing project tracking information (who's doing what, when and where in the region) for United States Government funded projects. In collaboration with 17 research agencies, project locations are displayed in a visually enhanced web mapping application. Key information about each project is presented along with links to web pages that provide additional information. The mapping application includes new reference data layers and an updated ship tracks layer. Visual enhancements are achieved by redeveloping the front-end from FLEX to HTML5 and JavaScript, which now provide access to mobile users utilizing tablets and cell phone devices. New tools have been added that allow users to navigate, select, draw, measure, print, use a time slider, and more. Other module additions include a back-end Apache SOLR search platform that provides users with the capability to perform advance searches throughout the ARMAP database. Furthermore, a new query builder interface has been developed in order to provide more intuitive controls to generate complex queries. These improvements have been made to increase awareness of projects funded by numerous entities in the Arctic, enhance coordination for logistics support, help identify geographic gaps in research efforts and potentially foster more collaboration amongst researchers working in the region. Additionally, ARMAP can be used to demonstrate past, present, and future research efforts supported by the U.S. Government.

  6. Joint Industry-Funded R and D Projects in Exploration and Production

    Energy Technology Data Exchange (ETDEWEB)

    Guerillot, D.; Eschard, R.; Malla, M.; Van Buchem, F.; Baghbani, D.; Granjeon, D.; Wolf, S.; Callot, J.P.; Jardin, A.; Kirkwood, D.; Rodriguez, S.; Abadi, A.; Roure, F.; Ghandriche, F.; Prinzhofer, A.; Moretti, I.; Le Melinaire, P.; Vizika, O.; Bekri, S.; Zinszner, B.; Lucet, N.; Rasologosaon, P.; Duquet, B.; Tonellot, T.; Nivlet, P.; Le Ravalec, M.; Bennis, C.; Barroux, C.; Hu, L.Y.; Doligez, B.; Vidal-Gilbert, S.; Zabalza-Mezghani, I.; Caillabet, Y.; Sarda, S.; Ricois, O.; Mouchel, R.; Behar, E.; Nabzar, L.; Zaitoun, A.; Audibert-Hayet, A.; Sauvant, V.; Chauchot, P.; Ropital, F.; Sinquin, A.; Decarre, S.; Larsen, R.; Biolley, F.; Brucy, F.; Charron, Y.; Averbuch, D.; Perrin, G.; Falcimaigne, J.; Roux, P.; Paen, D.; Broutin, P.; Renard, G.; Egermann, P.; Lombard, J.M.; Le Thiez, P.; Fries, G.

    2005-07-01

    IFP, the French Institute of Petroleum, spends more than 40% of its R and D budget on Exploration and Production. Part of this program is open to participation in the form of Joint Industry-Funded Projects (JIPs). This gives companies an opportunity to take part in the latest advances in research sponsoring the projects with others. They can steer their programs according to their needs and evaluate the practical contribution of these new technologies improving exploration and production. This document gathers the transparencies of the presentations given at the 2005 JIP seminar. Content: Opening Address; Session 1: Exploration and Petroleum System Evaluation: Berkine Gas with Sonatrach: an Evaluation of the Gas Potential of the Berkine Basin (Algeria), MEC with National Iran Oil Company: Middle East Cretaceous Sequence Stratigraphy Study, Dionisos: 3D Multi-lithological Stratigraphic Modeling for Basin and Reservoir, Scopes: Southern Cordillera Petroleum System Appraisal, Gaspe with Laval University (Quebec): Integrated Geophysical and Geological Study of the Gaspe Fold and Thrust Belt (Canada), Deep Sirt with the Petroleum Research Center (Libya): Deep Seismic Investigation in the Sirt Basin, Tell-offshore with Sonatrach: Petroleum Re-appraisal of North Algeria, Gong: Isotope Geochemistry of Natural Gases, Industrial JIP: Kine 3D Industrial with Earth Decision System: Putting Structural Geology Back into Structure Modeling; - Session 2: Petro-physics and Reservoir Characterization: PNM Car: Pore Scale Network Modeling for Carbonate Rocks, Pacs: Petro-acoustics of Carbonate Rocks for 4D Seismic Feasibility Studies, Safe: Seismic Analysis of Fracture Networks, Borneo 4D: 4D Time Lapse Seismic Modeling, Presti: Pre-stack Stratigraphic Inversion, Paris: Pseudo-Wells Applied to Reservoir Oriented Interpretation of Seismic Data, Muscat: Multi-scale Reservoir Description on Flexible Grids with Up-scaling and Down-scaling Techniques; - Session 3, Reservoir Engineering

  7. 34 CFR 426.4 - What activities does the Secretary fund under the Demonstration Projects?

    Science.gov (United States)

    2010-07-01

    ... Secretary supports the following types of projects: (a) Model projects providing improved access to quality... institutions; and (6) Men and women seeking to enter nontraditional occupations. (b)(1) Projects that are... and apprenticeship projects; (ii) Transitional work site job training for vocational education...

  8. Leadership in Real Time : A Model of Attributes Needed by a Project Manager in ERP Implementations

    OpenAIRE

    Gunson, John; De Blasis, Jean-Paul; Neary, Mary

    2003-01-01

    The characteristics and organizational impacts of an Enterprise Resource Planning (ERP) Implementation Project requires highly professional Project Manager skills and attributes. Some may be learned or bought but the more important skills need to be part of the Project Manager's personal makeup. Coaching, mentoring and leadership skills (and beyond) help the Project Manager to take right decisions as even unknown-unknown situations arise during the implementation. This paper contributes to id...

  9. Adapting the Consolidated Framework for Implementation Research to Create Organizational Readiness and Implementation Tools for Project ECHO.

    Science.gov (United States)

    Serhal, Eva; Arena, Amanda; Sockalingam, Sanjeev; Mohri, Linda; Crawford, Allison

    2018-03-01

    The Project Extension for Community Healthcare Outcomes (ECHO) model expands primary care provider (PCP) capacity to manage complex diseases by sharing knowledge, disseminating best practices, and building a community of practice. The model has expanded rapidly, with over 140 ECHO projects currently established globally. We have used validated implementation frameworks, such as Damschroder's (2009) Consolidated Framework for Implementation Research (CFIR) and Proctor's (2011) taxonomy of implementation outcomes, combined with implementation experience to (1) create a set of questions to assess organizational readiness and suitability of the ECHO model and (2) provide those who have determined ECHO is the correct model with a checklist to support successful implementation. A set of considerations was created, which adapted and consolidated CFIR constructs to create ECHO-specific organizational readiness questions, as well as a process guide for implementation. Each consideration was mapped onto Proctor's (2011) implementation outcomes, and questions relating to the constructs were developed and reviewed for clarity. The Preimplementation list included 20 questions; most questions fall within Proctor's (2001) implementation outcome domains of "Appropriateness" and "Acceptability." The Process Checklist is a 26-item checklist to help launch an ECHO project; items map onto the constructs of Planning, Engaging, Executing, Reflecting, and Evaluating. Given that fidelity to the ECHO model is associated with robust outcomes, effective implementation is critical. These tools will enable programs to work through key considerations to implement a successful Project ECHO. Next steps will include validation with a diverse sample of ECHO projects.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-No Derivatives License 4.0 (CCBY-NC-ND), where it is permissible to download and share the work provided it is properly cited

  10. An impact evaluation of the safe motherhood promotion project in Bangladesh: evidence from Japanese aid-funded technical cooperation.

    Science.gov (United States)

    Kamiya, Yusuke; Yoshimura, Yukie; Islam, Mohammad Tajul

    2013-04-01

    This paper reports the findings from a quasi-experimental impact evaluation of the Safe Motherhood Promotion Project (SMPP) conducted in the Narsingdi district of Bangladesh. SMPP is a Japanese aid-funded technical cooperation project aimed at developing local capacities to tackle maternal and newborn health problems in rural areas. We assessed whether the project interventions, in particular, community-based activities under the Model Union approach, had a favorable impact on women's access to and knowledge of maternal health care during pregnancy and childbirth. The project comprises a package of interlinked interventions to facilitate safe motherhood practices at primary and secondary care levels. The primary-level activities focused on community mobilization through participatory approaches. The secondary-level activities aimed at strengthening organizational and personnel capacities for delivering emergency obstetric care (EmOC) at district and sub-district level hospitals. The project impact was estimated by difference-in-differences logistic regressions using two rounds of cross-sectional household survey data. The results showed that the project successfully increased the utilization of antenatal visits and postpartum EmOC services and also enhanced women's knowledge of danger signs during pregnancy and delivery. The project also reduced income inequalities in access to antenatal care. In contrast, we found no significant increase in the use of skilled birth attendants (SBA) in the project site. Nonetheless, community mobilization activities and the government's voucher scheme played a complementary role in promoting the use of SBA. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Ways to Evaluate the Success of Your Teacher Incentive Fund Project in Meeting TIF Goals

    Science.gov (United States)

    Milanowski, Anthony; Finster, Matthew

    2016-01-01

    This brief outlines some simple methods that Teacher Incentive Fund grants could add to their local evaluations to find out how well they are promoting attainment of the four overall TIF goals. The methods described in this brief can help grantees determine if they are moving toward improving effectiveness, student achievement, and equity.…

  12. 78 FR 18617 - Recreational Boating Safety Projects, Programs and Activities Funded Under Provisions of the...

    Science.gov (United States)

    2013-03-27

    ... nationally for more real time accident information and to identify accidents that may involve regulatory non... associated lead and processing times resulting in a lag time between available funds and spending. The total... Factory Visit Program/Boat Testing Program, with an additional $857 for travel expenses. ($1,985,478).\\1...

  13. A Goal Programming R&D (Research and Development) Project Funding Model of the U.S. Army Strategic Defense Command Using the Analytic Hierarchy Process.

    Science.gov (United States)

    1987-09-01

    A187 899 A GOAL PROGRANNIN R&D (RESEARCH AND DEVELOPMENT) 1/2 PROJECT FUNDING MODEL 0 (U) NAVAL POSTGRADUATE SCHOOL MONTEREY CA S M ANDERSON SEP 87...PROGRAMMING R&D PROJECT FUNDING MODEL OF THE U.S. ARMY STRATEGIC DEFENSE COMMAND USING THE ANALYTIC HIERARCHY PROCESS by Steven M. Anderson September 1987...jACCESSION NO TITI E (Influde Securt ClauAIcatsrn) A Goal Programming R&D Project Funding Model of the U.S. Army Strategic Defense Command Using the

  14. The Arctic Research Mapping Application (ARMAP): a Geoportal for Visualizing Project-level Information About U.S. Funded Research in the Arctic

    Science.gov (United States)

    Kassin, A.; Cody, R. P.; Barba, M.; Gaylord, A. G.; Manley, W. F.; Score, R.; Escarzaga, S. M.; Tweedie, C. E.

    2016-12-01

    The Arctic Research Mapping Application (ARMAP; http://armap.org/) is a suite of online applications and data services that support Arctic science by providing project tracking information (who's doing what, when and where in the region) for United States Government funded projects. In collaboration with 17 research agencies, project locations are displayed in a visually enhanced web mapping application. Key information about each project is presented along with links to web pages that provide additional information, including links to data where possible. The latest ARMAP iteration has i) reworked the search user interface (UI) to enable multiple filters to be applied in user-driven queries and ii) implemented ArcGIS Javascript API 4.0 to allow for deployment of 3D maps directly into a users web-browser and enhanced customization of popups. Module additions include i) a dashboard UI powered by a back-end Apache SOLR engine to visualize data in intuitive and interactive charts; and ii) a printing module that allows users to customize maps and export these to different formats (pdf, ppt, gif and jpg). New reference layers and an updated ship tracks layer have also been added. These improvements have been made to improve discoverability, enhance logistics coordination, identify geographic gaps in research/observation effort, and foster enhanced collaboration among the research community. Additionally, ARMAP can be used to demonstrate past, present, and future research effort supported by the U.S. Government.

  15. The Council of Academic Hospitals of Ontario (CAHO) Adopting Research to Improve Care (ARTIC) Program: Reach, Sustainability, Spread and Lessons Learned from an Implementation Funding Model

    OpenAIRE

    Moore, Julia E.; Grouchy, Michelle; Graham, Ian D.; Shandling, Maureen; Doyle, Winnie; Straus, Sharon E.

    2016-01-01

    Despite evidence on what works in healthcare, there is a significant gap in the time it takes to bring research into practice. The Council of Academic Hospitals of Ontario's Adopting Research to Improve Care program addresses this research-to-practice gap by incorporating the following components into its funding program: strategic selection of evidence for implementation, education and training for implementation, implementation supports, executive champions and governance, and evaluation. F...

  16. Governance of Higher Education--Implementation of Project Governance

    Science.gov (United States)

    Macheridis, Nikos

    2017-01-01

    This article focuses on coordination between governance actors in higher education. The object of the study is a department at a public university, seen as a multi-project environment. The purpose of this article is to illustrate and analyze project governance as a tool that allows departmental management to coordinate with the authorities, the…

  17. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    Science.gov (United States)

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  18. Continued multidisciplinary project-based learning - implementation in health informatics.

    Science.gov (United States)

    Wessel, C; Spreckelsen, C

    2009-01-01

    Problem- and project-based learning are approved methods to train students, graduates and post-graduates in scientific and other professional skills. The students are trained on realistic scenarios in a broader context. For students specializing in health informatics we introduced continued multidisciplinary project-based learning (CM-PBL) at a department of medical informatics. The training approach addresses both students of medicine and students of computer science. The students are full members of an ongoing research project and develop a project-related application or module, or explore or evaluate a sub-project. Two teachers guide and review the students' work. The training on scientific work follows a workflow with defined milestones. The team acts as peer group. By participating in the research team's work the students are trained on professional skills. A research project on a web-based information system on hospitals built the scenario for the realistic context. The research team consisted of up to 14 active members at a time, who were scientists and students of computer science and medicine. The well communicated educational approach and team policy fostered the participation of the students. Formative assessment and evaluation showed a considerable improvement of the students' skills and a high participant satisfaction. Alternative education approaches such as project-based learning empower students to acquire scientific knowledge and professional skills, especially the ability of life-long learning, multidisciplinary team work and social responsibility.

  19. Ubiquitous-severance hospital project: implementation and results.

    Science.gov (United States)

    Chang, Bung-Chul; Kim, Nam-Hyun; Kim, Young-A; Kim, Jee Hea; Jung, Hae Kyung; Kang, Eun Hae; Kang, Hee Suk; Lee, Hyung Il; Kim, Yong Ook; Yoo, Sun Kook; Sunwoo, Ilnam; An, Seo Yong; Jeong, Hye Jeong

    2010-03-01

    The purpose of this study was to review an implementation of u-Severance information system with focus on electronic hospital records (EHR) and to suggest future improvements. Clinical Data Repository (CDR) of u-Severance involved implementing electronic medical records (EMR) as the basis of EHR and the management of individual health records. EHR were implemented with service enhancements extending to the clinical decision support system (CDSS) and expanding the knowledge base for research with a repository for clinical data and medical care information. The EMR system of Yonsei University Health Systems (YUHS) consists of HP integrity superdome servers using MS SQL as a database management system and MS Windows as its operating system. YUHS is a high-performing medical institution with regards to efficient management and customer satisfaction; however, after 5 years of implementation of u-Severance system, several limitations with regards to expandability and security have been identified.

  20. Introduction to biomass energy project financing, funding sources and government strategies

    Energy Technology Data Exchange (ETDEWEB)

    Nordlinger, D E [Skadden, Arps, Slate, Meagher and Flom, London (United Kingdom); Shaw, F C [Skadden, Arps, Slate, Meagher and Flom, Washington, D.C. (United States)

    1995-12-01

    Biomass projects can help developing countries to protect their environment as well as to build a modem infrastructure. However, such projects present, in addition to the more typical risks associated with fossil-fuel projects, certain risks relating to the unique technologies and fuels used in such projects. Further, their location in developing countries regularly creates enhanced political and credit risk as well. Biomass power projects, like any other power project, must be financed. To be financeable, a power project should allocate risk in the most efficient way, so as to maximize return on investment. This paper examines the way in which various project documents can be structured to allocate most efficiently the technology and fuel risks unique to biomass projects, as well as the more typical risks, such as construction risk, permitting risk, expropriation risk, currency risk, country risk, sovereign risks, operating risks and credit risk. In addition, this paper summarizes the public financing sources and support that are available to assist in meeting the unique risk profiles of biomass projects. Specifically, it examines some of the principal multilateral and export credit agencies having involvement in this area. Finally, it examines potential strategies available to the developer of a biomass project for soliciting the involvement of, and negotiating with, local governments and public financing agencies. (author)

  1. Introduction to biomass energy project financing, funding sources and government strategies

    International Nuclear Information System (INIS)

    Nordlinger, D.E.; Shaw, F.C.

    1995-01-01

    Biomass projects can help developing countries to protect their environment as well as to build a modem infrastructure. However, such projects present, in addition to the more typical risks associated with fossil-fuel projects, certain risks relating to the unique technologies and fuels used in such projects. Further, their location in developing countries regularly creates enhanced political and credit risk as well. Biomass power projects, like any other power project, must be financed. To be financeable, a power project should allocate risk in the most efficient way, so as to maximize return on investment. This paper examines the way in which various project documents can be structured to allocate most efficiently the technology and fuel risks unique to biomass projects, as well as the more typical risks, such as construction risk, permitting risk, expropriation risk, currency risk, country risk, sovereign risks, operating risks and credit risk. In addition, this paper summarizes the public financing sources and support that are available to assist in meeting the unique risk profiles of biomass projects. Specifically, it examines some of the principal multilateral and export credit agencies having involvement in this area. Finally, it examines potential strategies available to the developer of a biomass project for soliciting the involvement of, and negotiating with, local governments and public financing agencies. (author)

  2. Implementing a Zero Energy Ready Home Multifamily Project

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation, Davis, CA (United States); German, Alea [Alliance for Residential Building Innovation, Davis, CA (United States)

    2015-08-01

    An objective of this project was to gain a highly visible foothold for residential buildings built to the U.S. Department of Energy's Zero Energy Ready Home (ZERH) specification that can be used to encourage participation by other California builders. This report briefly describes two single family homes that were ZERH-certified, and focuses on the experience of working with developer Mutual Housing on a 62 unit multi-family community at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH certified multi-family project nationwide. This report discusses challenges encountered, lessons learned, and how obstacles were overcome.

  3. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  4. Healthcare for migrants, participatory health research and implementation science--better health policy and practice through inclusion. The RESTORE project.

    Science.gov (United States)

    MacFarlane, Anne; O'Reilly-de Brún, Mary; de Brún, Tomas; Dowrick, Christopher; O'Donnell, Catherine; Mair, Frances; Spiegel, Wolfgang; van den Muijsenbergh, Maria; van Weel Baumgarten, Evelyn; Lionis, Christos; Clissmann, Ciaran

    2014-06-01

    This is a time of unprecedented mobility across the globe. Healthcare systems need to adapt to ensure that primary care is culturally and linguistically appropriate for migrants. Evidence-based guidelines and training interventions for cultural competence and the use of professional interpreters are available across European healthcare settings. However, in real-world practice migrants and their healthcare providers 'get by' with a range of informal and inadequate strategies. RESTORE is an EU FP7 funded project, which is designed to address this translational gap. The objective of RESTORE is to investigate and support the implementation of guidelines and training initiatives to support communication in cross-cultural consultations in selected European primary care settings. RESTORE is a qualitative, participatory health project running from 2011-2015. It uses a novel combination of normalization process theory and participatory learning and action research to follow and shape the implementation journeys of relevant guidelines and training initiatives. Research teams in Ireland, England, the Netherlands, Austria and Greece are conducting similar parallel qualitative case study fieldwork, with a complementary health policy analysis led by Scotland. In each setting, key stakeholders, including migrants, are involved in participatory data generation and analysis. RESTORE will provide knowledge about the levers and barriers to the implementation of guidelines and training initiatives in European healthcare settings and about successful, transferrable strategies to overcome identified barriers. RESTORE will elucidate the role of policy in shaping these implementation journeys; generate recommendations for European policy driving the development of culturally and linguistically appropriate healthcare systems.

  5. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  6. Towards implementing climate services in Peru – The project CLIMANDES

    Directory of Open Access Journals (Sweden)

    G. Rosas

    2016-12-01

    The efforts accomplished within CLIMANDES improved the quality of the climate services provided by SENAMHI. The project hence contributed successfully to higher awareness and higher confidence in the climate information by SENAMHI.

  7. 42 CFR 137.4 - May Title V be construed to limit or reduce in any way the funding for any program, project, or...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Title V be construed to limit or reduce in any way the funding for any program, project, or activity serving an Indian Tribe under this or other... General Provisions § 137.4 May Title V be construed to limit or reduce in any way the funding for any...

  8. Bottlenecks in Software Defect Prediction Implementation in Industrial Projects

    OpenAIRE

    Hryszko Jarosław; Madeyski Lech

    2015-01-01

    Case studies focused on software defect prediction in real, industrial software development projects are extremely rare. We report on dedicated R&D project established in cooperation between Wroclaw University of Technology and one of the leading automotive software development companies to research possibilities of introduction of software defect prediction using an open source, extensible software measurement and defect prediction framework called DePress (Defect Prediction in Software Syst...

  9. D6.4 Implementation: Project Knowledge Management

    DEFF Research Database (Denmark)

    Dolog, Peter; Durao, Frederico; Jahn, Karsten

    2009-01-01

    This report presents the prototype for the project knowledge management in Logica. We describe the related theories and our approach, the ‘circle of knowledge’. According to our analysis it results in the data-based import or update process between two specialized applications, one for project...... management and one for knowledge sharing. We describe the applications involved and the features used. The main component here is a templating mechanism in the KiWi system....

  10. Pilot project for implementing corporate governance of IT

    OpenAIRE

    Fernández Martínez, Antonio; Gumbau Mezquita, José Pascual; Llorens Largo, Faraón

    2012-01-01

    This article presents the results of the IT Governance Enhancement Project (ITGEP) carried out in three Spanish universities (the University of Murcia, Jaume I University and the Polytechnic University of Cartagena) on the initiative of the IT Commission of the Spanish Association of University Rectors (CRUE). The aim of the project was to apply the reference framework of Governance of IT for Universities (GTI4U) in order to determine the best practices currently carried out in the three univ...

  11. Defining and implementing a model for pharmacy resident research projects

    Directory of Open Access Journals (Sweden)

    Dick TB

    2015-09-01

    Full Text Available Objective: To describe a standard approach to provide a support structure for pharmacy resident research that emphasizes self-identification of a residency research project. Methods: A subcommittee of the residency advisory committee was formed at our institution. The committee was initially comprised of 2 clinical pharmacy specialists, 1 drug information pharmacist, and 2 pharmacy administrators. The committee developed research guidelines that are distributed to residents prior to the residency start that detail the research process, important deadlines, and available resources. Instructions for institutional review board (IRB training and deadlines for various assignments and presentations throughout the residency year are clearly defined. Residents conceive their own research project and emphasis is placed on completing assignments early in the residency year. Results: In the 4 years this research process has been in place, 15 of 16 (94% residents successfully identified their own research question. All 15 residents submitted a complete research protocol to the IRB by the August deadline. Four residents have presented the results of their research at multi-disciplinary national professional meetings and 1 has published a manuscript. Feedback from outgoing residents has been positive overall and their perceptions of their research projects and the process are positive. Conclusion: Pharmacy residents selecting their own research projects for their residency year is a feasible alternative to assigning or providing lists of research projects from which to select a project.

  12. ROMANIAâ€(tm)S FACTS ABOUT INTERNAL CONTROL ENVIRONMENT OF EUROPEAN SOCIAL FUND FINANCED PROJECTS

    OpenAIRE

    Danescu Tatiana; Dogar Cristian

    2012-01-01

    The malfunctioning of internal control system of European Social Fund (ESF) financed interventions may prejudice the sound financial management principle. Incorporating COSO principles in the beneficiaryâ€(tm)s internal control systems may provide some warranties about compliance to the above mentioned principle as described in the EC Regulation 1605-2002. This study aims to explore some facts in actual internal control environment, as a base for future improvements of Romanian ESF beneficiar...

  13. ROMANIA’S FACTS ABOUT INTERNAL CONTROL ENVIRONMENT OF EUROPEAN SOCIAL FUND FINANCED PROJECTS

    OpenAIRE

    Dogar Cristian; Dãnescu Tatiana

    2012-01-01

    The malfunctioning of internal control system of European Social Fund (ESF) financed interventions may prejudice the sound financial management principle. Incorporating COSO principles in the beneficiary’s internal control systems may provide some warranties about compliance to the above mentioned principle as described in the EC Regulation 1605-2002. This study aims to explore some facts in actual internal control environment, as a base for future improvements of Romanian ESF beneficiaryâ€...

  14. How internal audit can contribute to the success of ERP implementation projects in an Irish context.

    OpenAIRE

    Bennett, John Michael Anthony

    2014-01-01

    non-peer-reviewed The aim of this study is to explore how Internal Audit can contribute towards the successful implementation of ERP (Enterprise Resource Planning) projects in an Irish context. ERP projects are well documented for high failure rates and adverse impact on receiving businesses. Although there is limited literature available concerning the role of Internal Audit within ERP implementations, there is plenty available relating to ERP implementations which document risks, problem...

  15. MANAGEMENT OF A COMPANY’S ECONOMIC SUSTAINABILITY IN THE PROCESS OF INNOVATIVE PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Juliana M. Sulejmanova

    2013-01-01

    Full Text Available The article is devoted to management of a company’s sustainability in the process of innovative projects implementation. The author suggests using dynamic index named aggregated index of a company’s economic stability. Criteria of choosing innovative projects to be implemented are worked out. These criteria add traditional estimation and take into account changing company’s economic stability at every stage of project lifecycle.

  16. Adequate Education: Issues in Its Definition and Implementation. School Finance Project, Working Papers.

    Science.gov (United States)

    Tron, Esther, Ed.

    Section 1203 of the Education Amendments of 1978 mandated the undertaking of studies concerning the adequate financing of elementary and secondary education in the 1980s. Created to carry out this mandate, the School Finance Project established as one of its goals reporting to Congress on issues implicit in funding educational adequacy. Several…

  17. Personalized Training in Romanian SME’s ERP Implementation Projects

    Directory of Open Access Journals (Sweden)

    Iuliana DOROBAT

    2010-01-01

    Full Text Available Many practitioners and IS researchers have stated that the overwhelming majority of Enter-prise Resource Planning (ERP systems implementations exceed their training budget and their time allocations. In consequence many Romanian SMEs that implement an ERP system are looking to new approaches of knowledge transfer and performance support that are better aligned with business goals, deliver measurable results and are cost effective. Thus, we have begun to analyze the training methods used in ERP implementation in order to provide a so-lution that could help us maximize the efficiency of an ERP training program. We proposed a framework of an ERPTraining module that can be integrated with a Romanian ERP system and which provides a training management that is more personalized, effective and less ex-pensive.

  18. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  19. The Perceptions of Stakeholders of the Implementation of a State Funding Model in South African Public Schools

    Science.gov (United States)

    Mestry, Raj; Berry, Brian

    2016-01-01

    The government has made great strides in redressing past imbalances in education through the National Norms and Standards for School Funding (NNSSF) policy that focuses on equity in school funding. This NNSSF model compels the state to fund public schools according to a poverty quintile system, where poor schools are allocated much more funding…

  20. Implementation of NUREG 1318 guidance within the Yucca Mountain Project

    International Nuclear Information System (INIS)

    La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

    1990-01-01

    This paper discusses the implementation of a quality assurance program that fulfills the requirements of the U.S. Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements for the identification of items and activities important to public radiological safety and waste isolation for placement on a Q-List and Quality Activities List and also for graded application of QA measures. The process and organization for implementing this guidance is discussed

  1. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  2. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  3. Examining to what extent the source of competitive funding influences scientific impact. A case study of Danish EU FP7 funded projects

    Energy Technology Data Exchange (ETDEWEB)

    Ryan, Thomas K.; Schneider, J.W.

    2016-07-01

    To many researchers the ability to secure external competitive funding is a basic premise for engaging in substantial research activities and subsequent career progression. In many countries competitive funding is increasingly incentivised, but like other social activities in science, funding success is skewed with marked cumulative advantages to those who already have (Merton, 1968). The ability to obtain competitive funding is clearly connected with prestige, nevertheless, while “money is money”, funding instruments supporting “curiositydriven”, “blue sky” research1 may still be more appealing and prestigious to many researchers. Such funding instruments are typically less restrictive in their calls on matters such as research topics, collaborative requirements and societal impact. The latter requirements are often present in more strategic funding programmes and especially the European Framework Programmes have stipulated a social contract between science and society in Europe, increasingly requiring research to be oriented towards addressing social, economic, cultural, and political challenges. Application for such “challenged-oriented” international research funding is perceived by some as over-complicated and too resource demanding and anecdotal evidence from Denmark suggests that high performing research groups opt to bypass such calls because they prefer and indeed are able to secure sufficient “curiosity-driven” funding with less obligations (UFM Report, 2015). (Author)

  4. DG Connect Funded Projects on Information and Communication Technologies (ICT) for Old Age People: Beyond Silos, CareWell and SmartCare.

    Science.gov (United States)

    Keijser, W; de Manuel-Keenoy, E; d'Angelantonio, M; Stafylas, P; Hobson, P; Apuzzo, G; Hurtado, M; Oates, J; Bousquet, J; Senn, A

    2016-01-01

    Information and communication technologies (ICT) are promising for the long-term care of older and frequently frail people. These innovations can improve health outcomes, quality of life and efficiency of care processes, while supporting independent living. However, they may be disruptive innovations. As all European member states are facing an increasing complexity of health and social care, good practices in ICT should be identified and evaluated. Three projects funded by DG CNECT are related to Active and Healthy Ageing (AHA) and frailty: (i) BeyondSilos, dealing with independent living and integrated services, (ii) CareWell, providing integrated care coordination, patient empowerment and home support and (iii) SmartCare, proposing a common set of standard functional specifications for an ICT platform enabling the delivery of integrated care to older patients. The three projects described in this paper provide a unique pan-European research field to further study implementation efforts and outcomes of new technologies. Below, based on a description of the projects, the authors display four domains that are in their views fundamental for in-depth exploration of heterogeneity in the European context: 1. Definition of easily transferable, high level pathways with solid evidence-base; 2. Change management in implementing ICT enabled integrated care; 3. Evaluation and data collection methodologies based on existing experience with MAST and MEDAL methodologies; and 4. Construction of new models for delivery of health and social care. Understanding complementarity, synergies and differences between the three unique projects can help to identify a more effective roll out of best practices within a varying European context.

  5. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  6. Principal results of 'DEWAM' project implementation, Russian Federation

    International Nuclear Information System (INIS)

    Nechaev, A.F.

    2002-01-01

    This overview summarizes the key results of the four-year project 'Decontamination and Waste Management in the Course of Research Reactors Decommissioning' carried out within the framework of the IAEA's CRP 'Decommissioning Techniques for Research Reactors'. The project included two principal components: (1) info-analytical studies and development of a database system, and (2) research and development in the areas of decontamination and waste management technologies applicable to decommissioning. Details of the work are expounded in 29 publications and annual Progress Reports; the results of the study are used in corresponding university courses; and innovative technologies for radwaste processing and environmental restoration are planned to be introduced into practice. (author)

  7. EBRD accelerates funding of energy projects in former USSR and East European countries

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    In the period mid November 1996 to mid January 1997, the European Bank for Reconstruction and Development announced involvement in seven projects. The largest was a 220 million loan to Gazprom. The financial arrangements for each of the seven projects are detailed. (author)

  8. An Analysis of Internally Funded Learning and Teaching Project Evaluation in Higher Education

    Science.gov (United States)

    Huber, Elaine; Harvey, Marina

    2016-01-01

    Purpose: In the higher education sector, the evaluation of learning and teaching projects is assuming a role as a quality and accountability indicator. The purpose of this paper is to investigate how learning and teaching project evaluation is approached and critiques alignment between evaluation theory and practice. Design/Methodology/Approach:…

  9. GASB's New Financial Reporting Model: Implementation Project for School Districts.

    Science.gov (United States)

    Bean, David; Glick, Paul

    1999-01-01

    In June 1999, the Governmental Accounting Standards Board (GASB) issued its statement on the structure of the basic financial reporting model for state and local governments. Explains the new financial reporting model and reviews the implementation issues that school districts will need to address. (MLF)

  10. Project W-320, WRSS PCP: Procedure implementation verification

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List

  11. Implementing Problem Based Learning through Engineers without Borders Student Projects

    Science.gov (United States)

    Wittig, Ann

    2013-01-01

    Engineers Without Borders USA (EWB) is a nonprofit organization that partners student chapters with communities in fundamental need of potable water, clean air, sanitation, irrigation, energy, basic structures for schools and clinics, roads and bridges, etc. While EWB projects may vary in complexity, they are all realistic, ill-structured and…

  12. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  13. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    Energy Technology Data Exchange (ETDEWEB)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  14. The adolescent family life program: a multisite evaluation of federally funded projects serving pregnant and parenting adolescents.

    Science.gov (United States)

    Kan, Marni L; Ashley, Olivia Silber; LeTourneau, Kathryn L; Williams, Julia Cassie; Jones, Sarah B; Hampton, Joel; Scott, Alicia Richmond

    2012-10-01

    We evaluated the effectiveness of care demonstration projects supported by the Title XX Adolescent Family Life (AFL) program, which serves pregnant and parenting adolescents in an effort to mitigate the risks associated with adolescent childbearing. This cross-site evaluation involved 12 projects and 1038 adolescents who received either enhanced services funded by the AFL program or usual care. We examined the effects of enhanced services on health, educational, and child care outcomes approximately 6 months to 2 years after intake and explored moderation of program effects by time since intake and project characteristics associated with outcomes. The odds of using long-acting reversible contraception (odds ratio [OR] = 1.58) and receiving regular child care (OR = 1.50) in the past month were higher in the intervention group than in the comparison group. Odds of a repeat pregnancy were lower (OR = 0.39) among intervention group adolescents than among comparison group adolescents within 12 months of intake. Several project characteristics were associated with adolescent health outcomes. These projects show promise in improving effective contraceptive use, increasing routine child care, and yielding short-term decreases in repeat pregnancy.

  15. EC-funded project (HTR-L) for the definition of a European safety approach for HTR's

    International Nuclear Information System (INIS)

    Ehster, S.; Dominguez, M.T.; Coe, I.; Brinkmann, G.; Lensa, W. von; Mheen, W. van der; Alessandroni, C.; Pirson, J.

    2002-01-01

    The inherent safety features of the HTRs make events leading to severe core damage highly unlikely and constitute the main differentiating aspects compared to LWRs. While a known and stable regulatory environment has long been established for Light Water Reactors, a different approach is necessary for the licensing of HTR based power plants. Among the R and D projects funded by the European Commission for HTR reactors, the HTR-L project is dedicated to the definition of a common and coherent European safety approach and the identification of the main licensing issues for the licensing framework of the Modular HTRs. Other specific objectives of this project are : To develop a methodology to classify the accidental conditions; To define the preliminary requirements for the confinement of radioactive products and to assess the need for a 'conventional' containment structure; To establish a SSC (2) classification and to define the rules for equipment qualification; To identify the key issues that need to be addressed in the licensing process of the HTRs; To organize a workshop with the concerned Safety Authorities at the end of the project. This paper will explain the project objectives and its final expected outcomes. (author)

  16. Development and implementation of a 600-MW natural gas cogeneration project - a financial case history

    International Nuclear Information System (INIS)

    Quinn, N.K.; Sherrill, R.L.

    1992-01-01

    In February 1990, General Electric Capital Corporation (GECC), through its wholly owned subsidiary, General Electric Power Funding Corporation (GEPFC), provided a number of commitments to a partnership (the Partnership) formed by a company that develops, owns, and operates cogeneration facilities to fund the development, construction, and permanent debt and equity financing of a 614 megawatt (M) cogeneration facility (the Project) to be located near a large refinery in the northeastern United States. The Project is unusual both for the magnitude of its natural gas requirements and for its contractual configuration. The Project's entire transportation needs and a substantial portion of its gas requirements will be met by a joint venture between two local gas distribution companies (the Joint Venture), one of which is a large gas-consuming utility in the eastern United States. The Project's power purchase customer, (the Utility Host), is another very large gas-consuming utility. Thus, the fuel cost recovery of the Project is determined by the Utility Host's gas costs while its actual bill for fuel will be heavily influenced by the Joint Venture's gas commodity and transportation costs. Therefore, in appraising the credit quality of the Project's proposed fuel supply arrangements, the key issue to be answered is: Are the Project's natural gas supply and transportation arrangements compatible with the fuel cost recovery provisions of the power sales agreement with the Utility Host? If so, then the sensitivity of the Project's financing to adverse gas price movements would be minimized

  17. North Region ROW tool implementation workshop.

    Science.gov (United States)

    2010-08-02

    Welcome to the North Region ROW Tool Workshop. This workshop is funded under an implementation project sponsored by TxDOTs Research & Technology Implementation Office (RTI). This is the second of four regional workshops being planned for this summ...

  18. 7 CFR 3402.23 - Documentation of progress on funded projects.

    Science.gov (United States)

    2010-01-01

    ... RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE FOOD AND AGRICULTURAL SCIENCES... of Fellows supported by any special international study or thesis/dissertation research allowance and... Research Information System (CRIS). The CRIS database contains narrative project information, progress...

  19. Report: Response to Congressional Request on Signage Requirements for Projects Funded by the Recovery Act

    Science.gov (United States)

    Report #10-X-0175, August 2, 2010. EPA developed two forms of guidance that discuss the need for recipients to display a Recovery Act logo to communicate to the public that the project is a Recovery Act investment.

  20. Evaluation of Current Automated Civil Engineer System Non-Appropriated Funds Project Programming Procedures

    National Research Council Canada - National Science Library

    Ligday, Joshua

    2004-01-01

    ...) project programming business rules within ACES. These problem areas were not addressed until recently when an integrated process team met and proposed numerous changes to how NAF programming is accomplished in ACES...

  1. 75 FR 33769 - Manufacturing Extension Partnership (MEP) Availability of Funds for Projects To Develop and...

    Science.gov (United States)

    2010-06-15

    ... to the long-term economic stability of the region. Please see the NIST MEP Web site, http://www.nist... region, and contribute to the long-term economic stability of the region. Competitive projects will use...

  2. A Multi-Level Examination of Stakeholder Perspectives of Implementation of Evidence-Based Practices in a Large Urban Publicly-Funded Mental Health System.

    Science.gov (United States)

    Beidas, Rinad S; Stewart, Rebecca E; Adams, Danielle R; Fernandez, Tara; Lustbader, Susanna; Powell, Byron J; Aarons, Gregory A; Hoagwood, Kimberly E; Evans, Arthur C; Hurford, Matthew O; Rubin, Ronnie; Hadley, Trevor; Mandell, David S; Barg, Frances K

    2016-11-01

    Our goal was to identify barriers and facilitators to the implementation of evidence-based practices from the perspectives of multiple stakeholders in a large publicly funded mental health system. We completed 56 interviews with three stakeholder groups: treatment developers (n = 7), agency administrators (n = 33), and system leadership (n = 16). The three stakeholder groups converged on the importance of inner (e.g., agency competing resources and demands, therapist educational background) and outer context (e.g., funding) factors as barriers to implementation. Potential threats to implementation and sustainability included the fiscal landscape of community mental health clinics and an evolving workforce. Intervention characteristics were rarely endorsed as barriers. Inner context, outer context, and intervention characteristics were all seen as important facilitators. All stakeholders endorsed the importance of coordinated collaboration across stakeholder groups within the system to successfully implement evidence-based practices.

  3. Implementing a Zero Energy Ready Home Multifamily Project

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [National Renewable Energy Laboratory (NREL), Golden, CO (United States); German, Alea [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-08-17

    Building cost-effective, high-performance homes that provide superior comfort, health, and durability is the goal of the U.S. Department of Energy’s (DOE’s) Zero Energy Ready Home (ZERH) program. Building America research and other innovative programs throughout the country have addressed many of the technical challenges of building to the ZERH standard. The cost-effectiveness of measure packages that result in 30% source energy savings compared to a code-compliant home have been demonstrated. However, additional challenges remain, particularly with respect to convincing production builders of the strong business case for ZERH. The Alliance for Residential Building Innovation (ARBI) team believes that the keys to successfully engaging builders and developers in the California market are to help them leverage development agreement requirements, code compliance requirements, incentives, and competitive market advantages of ZERH certification, and navigate through this process. A primary objective of this project was to gain a highly visible foothold for residential buildings that are built to the DOE ZERH specification that can be used to encourage participation by other California builders. This report briefly describes two single-family homes that were ZERH certified and focuses on the experience of working with developer Mutual Housing on a 62-unit multifamily community at the Spring Lake subdivision in Woodland, California. The Spring Lake project is expected to be the first ZERH-certified multifamily project in the country. This report discusses the challenges encountered, lessons learned, and how obstacles were overcome.

  4. FY 1999 report on basic survey project for joint implementations, etc. Feasibility study on energy conservation at Norsi Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project is to link in the future to COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) joint implementations, etc. Taken up in this survey are a topping unit, vacuum distillation unit, catalytic reforming unit, and a middle cut desulfurization unit. The purpose of the refurbishment is to conserve energy. It is estimated that 48000 TOE/year of energy will be saved and that there will be a 1.2-million tons-CO2/year reduction in greenhouse gas emissions. It is predicted that an amount equivalent to 1.3% of Russia's 1997 oil consumption will be saved across Russia and that there will be a greenhouse gas reduction equivalent to 8.8% of what Japan plans to reduce. The main problem to solve before execution of this project is in the raising of funds. Although Russia hopes that Japan will invest in the project, such at the present stage will be a high-risk venture now that the Russian economic situation and the details (CO2 emission trading, etc.) of its joint implementation framework are not yet definite. The reasonable way for Japan to follow will be to support Russia as a buyer using credits with Russia acting as the principle party. (NEDO)

  5. FY 1999 report on basic survey project for joint implementations, etc. Feasibility study on energy conservation at Norsi Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project is to link in the future to COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) joint implementations, etc. Taken up in this survey are a topping unit, vacuum distillation unit, catalytic reforming unit, and a middle cut desulfurization unit. The purpose of the refurbishment is to conserve energy. It is estimated that 48000 TOE/year of energy will be saved and that there will be a 1.2-million tons-CO2/year reduction in greenhouse gas emissions. It is predicted that an amount equivalent to 1.3% of Russia's 1997 oil consumption will be saved across Russia and that there will be a greenhouse gas reduction equivalent to 8.8% of what Japan plans to reduce. The main problem to solve before execution of this project is in the raising of funds. Although Russia hopes that Japan will invest in the project, such at the present stage will be a high-risk venture now that the Russian economic situation and the details (CO2 emission trading, etc.) of its joint implementation framework are not yet definite. The reasonable way for Japan to follow will be to support Russia as a buyer using credits with Russia acting as the principle party. (NEDO)

  6. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  7. West Valley demonstration project: Implementation of the kerosene mitigation plan

    International Nuclear Information System (INIS)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab

  8. [Applications and spproved projects of general program, young scientist fund and fund for less developed region of national natural science funds in discipline of Chinese materia medica, NSFC in 2011].

    Science.gov (United States)

    Han, Liwei; Wang, Yueyun; He, Wenbin; Zhang, Junjie; Bi, Minggang; Shang, Hongcai; Shang, Deyang; Wang, Chang'en

    2012-03-01

    The applications accepted and approved by general program, young scientist fund and fund for less developed region of national natural science funds in the discipline of Chinese materia medica, NSFC in 2011 have been introduced. The character and problems in these applications have been analyzed to give a reference to the scientists in the field of Chinese material medica.

  9. NASA Innovation Fund 2010 Project Elastically Shaped Future Air Vehicle Concept

    Science.gov (United States)

    Nguyen, Nhan

    2010-01-01

    This report describes a study conducted in 2010 under the NASA Innovation Fund Award to develop innovative future air vehicle concepts. Aerodynamic optimization was performed to produce three different aircraft configuration concepts for low drag, namely drooped wing, inflected wing, and squashed fuselage. A novel wing shaping control concept is introduced. This concept describes a new capability of actively controlling wing shape in-flight to minimize drag. In addition, a novel flight control effector concept is developed to enable wing shaping control. This concept is called a variable camber continuous trailing edge flap that can reduce drag by as much as 50% over a conventional flap. In totality, the potential benefits of fuel savings offered by these concepts can be significant.

  10. CONFIGURATION OF THE BUDGET IN THE “VILLA THEONELIS AGROTOURISM” STRUCTURAL FUNDS INVESTMENT PROJECT

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2013-11-01

    Full Text Available In order to anticipate the future of an investment project, we must understand the past and present of an enterprise. The income and expenses budget in an investment project, is drafted based on the enterprise’s historical data, carrying out all the profitability calculations on existing cash flows, supporting an anticipation, a full forecast of all the elements targeting the future investment project. The budget is an operational plan, a planning and control tool, based on knowledge. The financial projections are aimed at three or five years timeframes and they include the company’s revenue and expenditure forecasting, taking into account the need for capital coming from the company’s own sources, additional capital needs and the financing methods, based on professional judgment that scientifically calculates the expected efficiency. The procedure for having an investment project approved implies the existence of a typical documentation, involving, besides the financing request, the drafting of an income and expenses budget, for a 3 to 5 years timeframe.

  11. Day-to-day management of EU projects: Implementation of a local manager network to secure knowledge transfer

    Science.gov (United States)

    Hoffmann, Friederike; Meyer, Stefanie; de Vareilles, Mahaut

    2017-04-01

    In the past years there has been a strong push in Norway for increasing participation in the EU Framework Programmes for Research and Innovation. EU projects coordinated by the University of Bergen (UiB) usually receive management support from the central administration (mostly financial) in collaboration with a full- or part-time scientific project manager working on a fixed-term contract at the same institute as the project's principal scientist. With an increasing amount of granted EU projects, the number of scientific project managers employed across the whole university has also increased, and a need for coordination and professionalization of this service became obvious. Until recently, UiB had no unified structures and routines for training of newly recruited project managers, or for archiving and transferring routines and skills after the end of the project and the manager's employment contract. To overcome this administrative knowledge gap, the "Forum for scientific EU project managers at UiB" was founded in spring 2016 as an informal communication platform. Its purpose is to bring together current and previous scientific EU project managers from different disciplines to share their experiences. The main aim of the forum is to transfer and improve knowledge, skills and routines on effective management of EU funded projects, but also to function as a discussion forum where issues arising from handling international consortia can be reviewed. The group meets monthly and discusses current challenges from on-going EU projects as well as routines for specific project operation tasks. These routines are archived in an online best-practise guide which the group currently develops. The regular personal meetings are supplemented with an intense communication via a group mailing list and several individual mail- and phone-meetings. Since lessons learned during project implementation may improve future proposals, UiB research advisors for proposal support frequently

  12. National strategy for suicide prevention in Japan: impact of a national fund on progress of developing systems for suicide prevention and implementing initiatives among local authorities.

    Science.gov (United States)

    Nakanishi, Miharu; Yamauchi, Takashi; Takeshima, Tadashi

    2015-01-01

    In Japan, the Cabinet Office released the 'General Principles of Suicide Prevention Policy' in 2007 and suggested nine initiatives. In 2009, a national fund was launched to help prefectures (the administrative divisions of Japan) and local authorities implement five categories of suicide-prevention programs. This paper examines the impact of the national fund on the establishment of the systems for suicide prevention and the implementation of these initiatives among local authorities. The present study included 1385 local authorities (79.5%) from all 47 prefectures that responded to the cross-sectional questionnaire survey. Improved suicide-prevention systems and the implementation of nine initiatives in April 2013 were observed among 265 local authorities (19.1%) that implemented 'Training of community service providers' and 'Public awareness campaigns'; 178 local authorities (12.9%) that implemented 'Face-to-face counseling', 'Training of community service providers' and 'Public awareness campaigns'; and 324 local authorities (23.4%) that implemented 'Trauma-informed policies and practices'. There was no significant difference in suicide-prevention systems and the implementation of nine initiatives between 203 local authorities (14.7%) that implemented only 'Public awareness campaigns' and 231 local authorities (16.7%) that did not implement any suicide-prevention programs. The results of our study suggest that the national fund promoted the establishment of community systems for suicide prevention and helped implement initiatives among local authorities. The national suicide-prevention strategy in Japan should explore a standard package of programs to guide community suicide-prevention efforts with a sustained workforce among local authorities. © 2014 The Authors. Psychiatry and Clinical Neurosciences © 2014 Japanese Society of Psychiatry and Neurology.

  13. Conditions, factors and criteria for successful project implementation: generalization of experience of project management

    Directory of Open Access Journals (Sweden)

    Feraru Galina Sergeevna

    2014-11-01

    Full Text Available The article addresses issues characterizing features of project management contributing to their competitive advantage; shows the factors and criteria of success of projects and the main reasons for their failures, making the failed efforts of developers to create projects.

  14. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  15. Implementation of technical stage of ITER project in Kazakstan

    International Nuclear Information System (INIS)

    Shkol'nik, V.S.; Shemanskij, V.A.; Cherepnin, Yu.S.; Skoz, E.Ya.; Nazarenko, L.I.; Shestakov, V.P.; Tazhibaeva, I.L.

    1996-01-01

    The main executors of ITER project in Kazakstan are: National nuclear Centre; National Joint-stock Co. of the enterprises on atomic engineering and industry (KATEP) and Science and Research Inst. of Experimental and Theoretical Physics of the Kazakh National Univ. Principle directions of Kazakhstan Republic works in 1996/97 under the ITER project is possible to formulate as follows: - irradiation test of materials on the BN-350 reactor; -continuation of in-pile experiments on determination of deuterium interaction parameters with beryllium samples, manufactured by Ulba Metallurgical Plant (KATEP), using Research Water Heterogeneous Reactor; - conducting of in-pile experiments on determination of hydrogen isotope permeation parameters through vanadium alloys using Research Water Heterogeneous Reactor. Conducting of out-pile experiments with beryllium, and vanadium alloys; - investigation of beryllium structure and properties in respect to hydrogen in condition, simulating gas impurities inventory, under thermal and neutron influence; -simulation of plasma disruption on divertor; -simulation of water steam interaction with beryllium; - determination of hydrogen permeation parameters for various materials with 'in situ' surface by electronic spectroscopy; -development of manufacturing technology of beryllium connections with copper alloys

  16. Achievements and bottlenecks in humanitarian demining EU-funded research: final results from the EC DELVE project

    Science.gov (United States)

    Sahli, Hichem; Bruschini, Claudio; Van Kempen, Luc; Schleijpen, Ric; den Breejen, Eric

    2008-04-01

    The EC DELVE Support Action project has analyzed the bottlenecks in the transfer of Humanitarian Demining (HD) technology from technology development to the use in the field, and drawn some lessons learned, basing itself on the assessment of the European Humanitarian Demining Research and Technology Development (RTD) situation from early 1990 until 2006. The situation at the European level was analyzed with emphasis on activities sponsored by the European Commission (EC). This was also done for four European countries and Japan, with emphasis on national activities. The developments in HD during the last 10 years underline the fact that in a number of cases demining related developments have been terminated or at least put on hold. The study also showed that the funding provided by the EC under the Framework Program for RTD has led directly to the creation of an extensive portfolio of Humanitarian Demining technology development projects. The latter provided a range of research and supporting measures addressing the critical issues identified as a result of the regulatory policies developed in the field of Humanitarian Demining over the last ten years. However, the range of instruments available to the EC to finance the necessary research and development were limited, to pre-competitive research. The EC had no tools or programs to directly fund actual product development. As a first consequence, the EC funding program for development of technology for Humanitarian Demining unfortunately proved to be largely unsuitable for the small-scale development needed in a field where there is only a very limited market. As a second consequence, most of the research has been demonstrator-oriented. Moreover, the timeframe for RTD in Humanitarian Demining has not been sufficiently synchronized with the timeframe of the EC policies and regulations. The separation of the Mine Action and RTD funding streams in the EC did also negatively affect the take-up of new technologies. As a

  17. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  18. The Conception of the Information Management of Innovation Project and the Stages of its Implementation

    Directory of Open Access Journals (Sweden)

    Babinska Solomiia Ya.

    2017-01-01

    Full Text Available The informational support plays an important role in the development and implementation of innovative projects, is a prerequisite for development of its conception. Proceeding from this, the article considers approaches of scientists to components of the life cycle of innovation project, revealing that the most of them would allocate three phases (development, implementation, and completion. In terms of the information support for each of these stages were defined objectives, tasks, managerial decisions (selecting of an innovation object; choosing the economy sector; identifying sources of financing; costing; substantiating expediency as to implementing a project; choosing counter-parties; product pricing; selecting markets; further use of the property objects, information arrays, necessary sources of information, it was considered how the conception of information management of innovation project is being implemented in stages.

  19. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  20. Implementation of a project-based engineering school: increasing student motivation and relevant learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-11-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the contents and competencies of several courses. This paper presents the academic context under which this experience has been implemented, and a summary of the work done to design and implement the Project-Based Engineering School at the UEM. The steps followed, the structure used, some sample projects, as well as the difficulties and benefits of implementing the programme are discussed in this paper. The results are encouraging as students are more motivated and the initial set objectives were accomplished.

  1. Classroom Environment in the Implementation of an Innovative Curriculum Project in Science Education.

    Science.gov (United States)

    Suarez, Mercedes; Pias, Rosa; Membiela, Pedro; Dapia, Dolores

    1998-01-01

    Analyzes the perceptions of students, teachers, and external observers in order to study the influence of classroom environment on the implementation of an innovative project in science education. Contains 33 references. (DDR)

  2. State and Federal project development procedures for bus rapid transit : managing differences and reducing implementation delays

    Science.gov (United States)

    2011-08-01

    This report documents an investigation into the transportation project development process in the : context of the implementation of bus rapid transit systems on the State Highway System as well as such : systems being part of the Federal New Starts ...

  3. Measurements and controls implementation for the WEST project

    International Nuclear Information System (INIS)

    Daniel, Raju; Bhandarkar, Manisha; Moreau, P.

    2015-01-01

    This paper provides an overview of the diagnostics implemented on WEST and gives more details on the infra-red system which is one of the main systems used to analyze the heat loads and ensure the machine protection. The modification of the CODAC and communications networks is also discussed. The new functionalities and architecture of the WEST PCS are detailed; especially it ensures the orchestration of many subsystems such as diagnostics, actuators and allows handling asynchronous off-normal events during the plasma discharge. In correlation the plasma discharge is now seen as a set of elementary pieces (called segments) joints together. Development of new plasma controllers will be addressed. An overview of the first wall monitoring activity and development is provided. Finally preparing the plasma restart requires control oriented modelling and simulations devoted to the control of the plasma shape will be presented

  4. 76 FR 15964 - Funding Priorities: Disability and Rehabilitation Research Projects and Centers Program

    Science.gov (United States)

    2011-03-22

    ... of any further ways we could reduce potential costs or increase potential benefits while preserving... would also provide logistical and financial support for annual meetings of the Project Directors of the...) Organizing and providing logistical and financial support for annual meetings of the ADA Regional Centers...

  5. Achievements & bottlenecks in humanitarian demining EU-funded research: Final results from the EC DELVE project

    NARCIS (Netherlands)

    Sahli, H.; Bruschini, C.; Kempen, L. van; Schleijpen, H.M.A.; Breejen, E. den

    2008-01-01

    The EC DELVE Support Action project has analyzed the bottlenecks in the transfer of Humanitarian Demining (HD) technology from technology development to the use in the field, and drawn some lessons learned, basing itself on the assessment of the European Humanitarian Demining Research and Technology

  6. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  7. 7 CFR 4280.15 - Ultimate Recipient Projects eligible for Rural Economic Development Loan funding.

    Science.gov (United States)

    2010-01-01

    ... Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF... may only be used to provide the following assistance: (a) Start-Up Venture costs, including, but not... capital; (b) Business expansion; (c) Business Incubators; (d) Technical Assistance; (e) Project...

  8. Some aspects concerning the implementation of a fuel technology project

    International Nuclear Information System (INIS)

    Andreescu, N.; Alecu, M.; Mirion, I.

    1977-01-01

    The nuclear power programme in Romania envisages that until 1990 there will be installed about 6000 MWe in nuclear power plants. In order to put into practice such a nuclear programme there will be necessary high investments, possible to be achieved only by the ever increasing participation of the Romanian industry. With a view to this purpose, the Romanian authorities pay great attention to the research and development of the nuclear fuel manufacturing technology. Some research started in 1968-1969 and was intensified later in 1971 when the Institute for Nuclear Technology was founded and in 1972 when the IAEA-UNDP programme ''Development of Nuclear Technology in Romania'' started. This programme was conceived to deal with; 1. technology of UO2 powder and pellet fabrication; 2. manufacturing technology of fuel rods and bundle; 3. irradiation test of fuel rods; 4. development of various activities connected to fuel technology (thermal transfer loops, corrosion tests, neutronic, thermal and hydrodynamical calculations). Within the IAEA-UNDP project a demonstration facility was installed at INT where a great number of the works, resulting from the above mentioned directions, were performed. As a result of these works, at the end of 1975 in the demonstration facility there were manufactured in a reproducible way fuel rods according to the required specifications. The paper further presents the adopted irradiation testing programme, the out-of-pile testing programme, as well as some performances obtained during the different phases of the whole project. There have been conceived and manufactured some equipment meant for fabrication, tests, or for current control. The paper also shows some aspects connected to the personnel formation, as well as some aspects that will have to be solved in order to make possible the step from the demonstration facility to a fuel plant

  9. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  10. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  11. [Implementing population-based integrated care for a region: a work-in-progress report on the project "Gesundes Kinzigtal"].

    Science.gov (United States)

    Hildebrandt, Helmut; Schmitt, Gwendolyn; Roth, Monika; Stunder, Brigitte

    2011-01-01

    The regional integrated care model "Gesundes Kinzigtal" pursues the idea of integrated health care with special focus on increasing the health gain of the served population. Physicians (general practitioners) and psychotherapists, physiotherapists, hospitals, nursing services, non-profit associations, fitness centers, and health insurance companies work closely together with a regional management company and its programs on prevention and care coordination and enhancement. The 10 year-project is run by a company that was founded by the physician network "MQNK" and "OptiMedis AG", a corporation with public health background specialising in integrated health care. The aim of this project is to enhance prevention and quality of health care for a whole region in a sustainable way, and to decrease costs of care. The article describes the special funding model of the project, the engagement of patients, and the different health and prevention programmes. The programmes and projects are developed, implemented, and evaluated by multidisciplinary teams. Copyright © 2011. Published by Elsevier GmbH.

  12. LIFE+ TRUST project: tool to assist the implementation of the Framework Directive 2000/60/CE, methodology and results

    Directory of Open Access Journals (Sweden)

    Vincenzo Marsala

    2014-09-01

    Full Text Available The TRUST project is funded by the European Commission’s by the Life+ Programme. The aim of the TRUST project is the identification of the adaption and mitigation measures to counteract the impacts of climate change on the groundwater of the Upper Plain in the Veneto and Friuli region in North-Eastern Italy. The TRUST project aims at implementing a water balance modelling tool to support institutions in formulating sustainable water management planning policies and best practices. This paper reviews the development and application of the tools for the groundwater balance model that simulate the groundwater deficit. Projections on the water deficit as a function of Climate Change have used future precipitation and evapotranspiration patterns derived from climate simulations (SRES-IPCC scenarios A1B and A2 of the Mediterranean region for the 20th and 21st centuries. Model outputs showed that a significant part of future water deficit might be recovered with Managed Aquifer Recharge that will permit the groundwater management preventing the climate change effect.

  13. An assessment of EU-funded research projects: innovators and their innovative potential

    Energy Technology Data Exchange (ETDEWEB)

    Nepelski, D.; Pesole, A.; Van Roy, V.; O’Neill, E.

    2016-07-01

    The European Commission's Framework Programme constitutes an important share in R&D expenditures in Europe. A number of FP7 projects certainly produce cutting-edge technologies and a significant percentage of these technologies could be commercialized. However, there is a general feeling that not all these technologies and innovations with commercial potential reach the market. The question is why? The Innovation Radar (IR) is a support initiative that focuses on the identification of high-potential innovations in the ICT FP7 projects and the key organization in delivering these innovations to the market. The current paper documents the details of the IR methodology and the results of its first application. (Author)

  14. Funding Continuum for Private Business Owners: Evidence from the Pepperdine Private Capital Markets Project Survey

    OpenAIRE

    Maretno A. Harjoto; John K. Paglia

    2011-01-01

    The Pepperdine Private Capital Markets Project survey for business owners, administered during the spring of 2010, reveals an increasingly important role of friends and family (Friends/Family) to provide capital for privately-held businesses. Examining business owners’ perceptions of their sources of capital reveals that, overall, business owners prefer Friends/Family and angel financing as well as asset-based lenders and banks (ABL/Bank). Business owners consider Friends/Family financing to ...

  15. Funding innovation

    CERN Multimedia

    Marina Giampietro

    2012-01-01

    For the first time, six knowledge and technology transfer activities are set to benefit from a dedicated fund made available by the Knowledge Transfer group. This initiative cements CERN’s commitment to sharing its technological knowledge and expertise with society.   GEM detectors for flame detection and early earthquake prediction, radio-frequency absorbers for energy recovery, and exotic radioisotopes for medical applications are among the projects funded by the recently introduced KT Fund. “CERN’s scientific programme generates a considerable amount of intellectual property, a natural driver for innovation,” explains Giovanni Anelli, Head of the Knowledge Transfer Group. “Very often, though, financial support is needed to bring the newly-born technologies a step further and make them ready for transfer to other research institutes or to companies.” This is where the KT fund comes into play. It provides vital support in the early sta...

  16. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    Science.gov (United States)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  17. A locally funded Puerto Rican parrot (Amazona vittata genome sequencing project increases avian data and advances young researcher education

    Directory of Open Access Journals (Sweden)

    Oleksyk Taras K

    2012-09-01

    Full Text Available Abstract Background Amazona vittata is a critically endangered Puerto Rican endemic bird, the only surviving native parrot species in the United States territory, and the first parrot in the large Neotropical genus Amazona, to be studied on a genomic scale. Findings In a unique community-based funded project, DNA from an A. vittata female was sequenced using a HiSeq Illumina platform, resulting in a total of ~42.5 billion nucleotide bases. This provided approximately 26.89x average coverage depth at the completion of this funding phase. Filtering followed by assembly resulted in 259,423 contigs (N50 = 6,983 bp, longest = 75,003 bp, which was further scaffolded into 148,255 fragments (N50 = 19,470, longest = 206,462 bp. This provided ~76% coverage of the genome based on an estimated size of 1.58 Gb. The assembled scaffolds allowed basic genomic annotation and comparative analyses with other available avian whole-genome sequences. Conclusions The current data represents the first genomic information from and work carried out with a unique source of funding. This analysis further provides a means for directed training of young researchers in genetic and bioinformatics analyses and will facilitate progress towards a full assembly and annotation of the Puerto Rican parrot genome. It also adds extensive genomic data to a new branch of the avian tree, making it useful for comparative analyses with other avian species. Ultimately, the knowledge acquired from these data will contribute to an improved understanding of the overall population health of this species and aid in ongoing and future conservation efforts.

  18. Exploring the Effects of Technology Overload on the Outcomes of Enterprise Resource Planning (ERP) Implementation Projects

    Science.gov (United States)

    Kates, Earl B.

    2016-01-01

    Despite significant investments made by organizations to implement ERP systems and prior research that explored contributing factors of ERP failure, the ERP implementation success rate continues to remain low in practice. Increased technology usage in the workplace coupled with higher dependency on technology to complete project tasks often leads…

  19. Implementation through Innovation: A Literature-Based Analysis of the Tuning Project

    Science.gov (United States)

    Pálvölgyi, Krisztián

    2017-01-01

    Tuning Educational Structures in Europe is perhaps the most important higher education innovation platform nowadays. The main objective of the Tuning Project is to develop a tangible approach to implement the action lines of the Bologna Process; thus, implementation and innovation are closely linked in Tuning. However, during its development,…

  20. Project and implementation of the human/system interface laboratory

    International Nuclear Information System (INIS)

    Carvalho, Paulo Victor R. de; Obadia, Isaac Jose; Vidal, Mario Cesar Rodriguez

    2002-01-01

    Analog instrumentation is being increasingly replaced by digital technology in new nuclear power plants, such as Angra III, as well as in existing operating plants, such as Angra I and II, for modernization and life-extension projects. In this new technological environment human factors issues aims to minimize failures in nuclear power plants operation due to human error. It is well known that 30% to 50% of the detected unforeseen problems involve human errors. Presently, human factors issues must be considered during the development of advanced human-system interfaces for the plant. IAEA has considered the importance of those issues and has published TECDOC's and Safety Series Issues on the matter. Thus, there is a need to develop methods and criteria to asses, compare, optimize and validate the human-system interface associated with totally new or hybrid control rooms. Also, the use of computer based operator aids is en evolving area. In order to assist on the development of methods and criteria and to evaluate the effects of the new design concepts and computerized support systems on operator performance, research simulators with advanced control rooms technology, such the IEN's Human System Interface Laboratory, will provide the necessary setting. (author)

  1. Implementing Biogas Technology Project in Malvar, Batangas, Philippines

    Directory of Open Access Journals (Sweden)

    Juvy G. Mojares

    2015-11-01

    Full Text Available This study sought to determine the environmental and social impacts of the biogas technology project of the municipal government of Malvar, Batangas, Philippines, through the Municipal Environment and Natural Resources Office. Document analysis and interview were employed in this study. Results showed that heat and electricity generation from biogas decreased dependency on electricity and fuel oil.In terms of social impacts, the biogas technology contributed to socio-economic improvement of the barangay in the form of job creation, technological and skills transfer through training in biogas production, contribution to continuous pursuing of energy neutrality and encouraged sustainability development at the community level. Aside from these, the technology was a source of organic fertilizer for the farming community of Malvar. It is recommended that commercial farms be strictly monitored and ordinances be imposed on them specifically on the use of biogas technology. The municipal government could partner with GOs and NGOs providing grant or equipment for such technology. For the monitoring of backyard farms, develop close coordination with barangay officials, if it does not work, plan a consultative meeting with agencies concerned to explain the hazards of improper disposal of hog wastes.

  2. Storytelling Practices in Project Management : Exploratory study in new business process implementation in Information and Communication Technology projects

    OpenAIRE

    Abdubaliev, Ulukbek; Akysheva, Aizhan

    2017-01-01

    Stories have always been present in the life of people as a part of their culture, it is a rather ancient narrative technique. The message delivered in a form of a story is specifically appealing to listeners, which makes it a powerful communication tool. The thesis explores storytelling practices in project management by answering the question: “How project managers use storytelling in new business process implementation in ICT projects?” The choice of the topic was driven by the gap in the ...

  3. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  4. Improving Science Attitude and Creative Thinking through Science Education Project: A Design, Implementation and Assessment

    Science.gov (United States)

    Sener, Nilay; Türk, Cumhur; Tas, Erol

    2015-01-01

    The purpose of this study is to examine the effects of a science education project implemented in different learning environments on secondary school students' creative thinking skills and their attitudes to science lesson. Within this scope, a total of 50 students who participated in the nature education project in Samsun City in 2014 make up the…

  5. From Project Management Capabilities to ERP Implementation Success: The Mediating Effect of IT Executives' Capabilities

    Science.gov (United States)

    Touir, Maatallah

    2016-01-01

    Enterprise resource planning project implementation success is necessary for organizations to enhance productivity and achieve operational efficiency; however, the failure rates of ERP projects remain high, ranging between 10% and 90%, and costing organizations $500,000 to $300 million. The problem addressed in this study was the low success rate…

  6. Implementation of a Project-Based Engineering School: Increasing Student Motivation and Relevant Learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-01-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the…

  7. Implementing care programmes for frail older people: A project management perspective

    NARCIS (Netherlands)

    Bindels, J.; Cox, K.; Abma, T.A.; van Schayck, O.C.P.; Widdershoven, G.

    2015-01-01

    Objective: To examine the issues that influenced the implementation of programmes designed to identify and support frail older people in the community in the Netherlands. Methods: Qualitative research methods were used to investigate the perspectives of project leaders, project members and members

  8. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  9. System implementation: managing project and post project stage - case study in an Indonesian company

    NARCIS (Netherlands)

    Govindaraju, Rajesri; de Bruijn, E.J.; Fisscher, O.A.M.; Laptaned, U

    2007-01-01

    The research reported in this paper aims to get a better understanding of how the implementation process of enterprise systems (ES) can be managed, by studying the process from an organisational perspective. A review of the literature on previous research in ES implementation has been carried out

  10. Features of conflict sensitivity implementation mechanisms’ in the public sector projects

    Directory of Open Access Journals (Sweden)

    T. V. Маматоvа

    2017-08-01

    Full Text Available It has been found in the study that potential conflicts are natural for public sector projects. Among the factors, that predetermine it, one can distinguish the following: the opposite to the processes of making changes; competition of participants during the allocation of project resources; different opportunities to access the project product; insufficient consideration of interested parties’ interests; context conflicts; directing the project to resolve the conflict in the territory; unsuccessful selection of the project team. Consequently, the article deals with the issues related to the definition of the peculiarities of the «conflict sensitivity» implementation mechanisms in the public sector projects. This topic has not been studied thoroughly in the specialized publications on public administration in Ukraine. Definitions of main related categories of the «conflict sensitivity» domain based on Conflict Sensitivity Consortium guidelines have been described in the study: «conflict sensitivity», «conflict», «conflict analysis», «conflict sensitivity analysis». The main ideas on the peculiarities of conflict-sensitive project / program management implementation mechanisms in the context of ensuring the success of local development projects by the integration of «conflict sensitivity» into all three phases of the project cycle, under which the intervention is implemented, are as follows: conflict-sensitive planning; conflict-sensitive implementation; conflict-sensitive monitoring and evaluation. The example of the conflict-sensitive project management use is: EUNPACK international project «Good intentions, mixed results – A conflict sensitive understanding of the EU comprehensive approach to conflict and crisis mechanisms», which aims to develop recommendations on the improvement of the EU crises response mechanisms by the increase of their sensitivity to conflict and context. As a result, prospects for further research

  11. The SMILING project

    DEFF Research Database (Denmark)

    Berger, Jacques; Blanchard, Gentiane; Ponce, Maiza Campos

    2013-01-01

    The "Sustainable Micronutrient Interventions to Control Deficiencies and Improve Nutritional Status and General Health in Asia" project (SMILING), funded by the European Commission, is a transnational collaboration of research institutions and implementation agencies in five Southeast Asian count...

  12. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...

  13. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  14. Implementation of knowledge management approach in project oriented activities. Experience from simulator upgrade project

    International Nuclear Information System (INIS)

    Pironkov, L.

    2010-01-01

    Project specifics: Replacement of analogue process control system with Ovation®based Distributed Control System; Hybrid solution with simulated I&C logic and stimulated Human Machine Interface; Initial design ‐“turn‐key” project based on standard relationship “single customer –single contractor

  15. Consensus implementation of a groundwater remediation project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hastings, K.R.; Carlson, D.S.

    1996-01-01

    Because of significant characterization uncertainties existing when the Record of Decision was signed and the unfavorable national reputation of groundwater pump and treat remediation projects, the Test Area North (TAN) groundwater ROD includes the evaluation of five emerging technologies that show potential for treating the organic contamination in situ or reducing the toxicity of contaminants above ground. Treatability studies will be conducted to ascertain whether any may be suitable for implementation at TAN to yield more timely or cost effective restoration of the aquifer. The implementation approach established for the TAN groundwater project is a consensus approach, maximizing a partnership relation with stakeholders in constant, iterative implementation decision making

  16. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  17. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  18. The concept of health technology assessment. Views of applicants to funding of HTA projects.

    Science.gov (United States)

    Lange, M; Jørgensen, T; Kristensen, F B; Stilvén, S

    2000-01-01

    The purpose of this study is to analyze the perception of the content of health technology assessment (HTA) among health professionals applying for a state grant of DKK 10 million. A total of 113 applications were received and analyzed. When conducting the analysis, it was assumed that the applicants' maximum five-page project description would reflect: a) the applicants' perception of what an HTA is; b) how the assessment was to be conducted; and c) what the results were going to be used for. More than 40% of all applications focused on treatment; in 51% only one or two professional groups were to be involved (thus interdisciplinarity was questionable); only 22% of the HTA cases were intended to form the basis for political/administrative decisions; in general, the HTAs were planned far less comprehensively than was relevant; 76% of the projects did not include a formal synthesis phase; 41% intended to use diffusion as the only method for publication of the HTA result. The analysis reveals several areas where DIHTA has to make an effort in order to secure that HTA in fact constitutes a comprehensive and well-documented basis for decision making. These areas concern the following topics: multidisciplinarity, the objective of HTA, comprehensiveness, the synthesis phase, and publication and utilization of the HTA result.

  19. The Impact of an Implementation Project on Primary Care Staff Perceptions of Delivering Brief Alcohol Advice

    Directory of Open Access Journals (Sweden)

    Hanna Reinholdz

    2016-01-01

    Full Text Available Objective. To explore how the perceptions and experiences of working with risky drinkers change over time among primary health care staff during a systematic implementation project. Methods. Qualitative focus group interviews took place before and after the implementation of the project. Results. The staff displayed a positive change during the implementation period with regard to awareness, knowledge, and confidence that led to a change in routine practice. Throughout the project, staff were committed to engaging with risky drinkers and appeared to have been learning-by-doing. Conclusions. The results indicated a positive attitude to alcohol prevention work but staff lack knowledge and confidence in the area. The more practical experience during the study is, the more confidence seems to have been gained. This adds new knowledge to the science of implementation studies concerning alcohol prevention measures, which have otherwise shown disappointing results, emphasizing the importance of learning in practice.

  20. An empirical identification and categorisation of training best practices for ERP implementation projects

    Science.gov (United States)

    Esteves, Jose Manuel

    2014-11-01

    Although training is one of the most cited critical success factors in Enterprise Resource Planning (ERP) systems implementations, few empirical studies have attempted to examine the characteristics of management of the training process within ERP implementation projects. Based on the data gathered from a sample of 158 respondents across four stakeholder groups involved in ERP implementation projects, and using a mixed method design, we have assembled a derived set of training best practices. Results suggest that the categorised list of ERP training best practices can be used to better understand training activities in ERP implementation projects. Furthermore, the results reveal that the company size and location have an impact on the relevance of training best practices. This empirical study also highlights the need to investigate the role of informal workplace trainers in ERP training activities.

  1. The SISTEMA Project contribution in the implementation of the GEO Geohazards Supersite initiative

    Science.gov (United States)

    Vilardo, Giuseppe; Sangianantoni, Agata; Borgstrom, Sven; D'Auria, Luca; De Martino, Prospero; Dolce, Mario; Isaia, Roberto; Marotta, Enrica; Martini, Marcello; Obrizzo, Francesco; Peluso, Rosario; Sansivero, Fabio; Scarpato, Giovanni; Siniscalchi, Valeria; Tammaro, Umberto; Tulino, Sabrina; Castellano, Mario; Bianco, Francesca

    2017-04-01

    SISTEMA Project has been funded by the PO FESR 2007-2013 action, supported by the Campania Region (Italy). The project fosters the integrated use of multidisciplinary data in order to improve the understanding of the volcanic processes at Campi Flegrei and Ischia and to progress in science and surveillance of the territory according to the rationale of Supersite GEO initiative to Campi Flegrei, currently identified as Permanent Supersite. The mission of SISTEMA is to upgrade the existing monitoring and surveillance systems through the design, purchase and installation of new instrumentation, equipment, technology and methods addressing the need of delivering, with improved rapidity, scientific information for decision makers and end-users. The redundancy of monitoring systems is an important issue to guarantee the full operability during emergencies. The Monitoring Centre of INGV-Osservatorio Vesuviano is currently located within the red zone (potentially at risk of invasion by pyroclastic flows in case of eruption) of Campi Flegrei volcano. Its position offers various logistic benefits but at the onset of a volcanic crisis, of course it will be required to shift this Center in a safer area. For this reason, within the SISTEMA project, we envisioned a backup system which, when needed, could guarantee a shift of the Center in a virtually zero time. This can be achieved by fully duplicating the processing system and the data storage. In case of emergency, it would be required only to switch on the visualization systems in the new Center and transferring the personnel involved in the surveillance activities. SISTEMA project has also enabled the development of a permanent GPS and CRs (Corner Reflectors) networks, the latter supporting SAR Interferometry, by helping to improve knowledge of the Campi Flegrei deformation field, both on local and wide scale. In addition, in order to enhance the heat flux measurements from ground based thermal camera observations, the

  2. Structural equation model for the evaluation of national funding on R&D project of SMEs in consideration with MBNQA criteria.

    Science.gov (United States)

    Sohn, S Y; Gyu Joo, Yong; Kyu Han, Hong

    2007-02-01

    Financial support on the R&D in Science & Technology for SMEs at the governmental level plays a crucial role on the improvement of the national competitiveness. Korea Science & Engineering Foundation (KOSEF) has supported the R&D projects of SMEs with the competitive technology ability by way of the Science and Technology Promotion Fund. In this paper, we propose a structural equation model (SEM) to evaluate the performance of such a funding program in terms of three aspects: output, outcome and impact under given funding inputs, R&D environment of a recipient company, and external evaluation programs of funding organization. We adopt Malcolm Baldrige National Quality Award (MBNQA) criteria to assess the R&D environmental factors of recipient companies. In addition, we test the effect of interim evaluation of the funded project. The proposed model is applied to the real case and is used to identify the best practices as well as to provide feedback information for the improvement of the government funding programs of the R&D projects of SMEs.

  3. Contributions of the PMBok to the Project Management of an ERP System Implementation

    Directory of Open Access Journals (Sweden)

    Rui Manuel da Silva Gomes

    2013-12-01

    Full Text Available The implementation of Enterprise Resource Planning (ERP Systems has become generalized in companies and organizations, as a way to achieve the supply chain integration, to improve productivity and gain competitive advantages. Those implementations, more than simple technology projects, have revealed to be complex and time consuming business projects due to the structural and behaviour changes involved. This article analyzes, through the Project Coordinator’s point of view, two real cases of ERP implementation projects at Ibico Portuguesa, comparing the project management methodology adopted by Ibico with the Project Management Body of Knowledge (PMBoK, coming to the conclusion that the use of the PMBoK norms and best practices by the Project Manager could have been a success factor in those implementations, particularly referring to the elements that have been pointed as the most critical: planning, involvement and commitment of top management as well as stakeholders’ management.DOI:10.5585/gep.v4i2.37

  4. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  5. Recent status and prospects of the EU-funded ALPINE project

    Science.gov (United States)

    Selleri, Stefano; Cucinotta, Annamaria; Poli, Federica; Coscelli, Enrico; Passaro, Davide; Leick, Lasse; Hernandez, Yves; Bermudez, Veronica; Zibik, Evgeny; Lichtenstein, Norbert; Lotter, Erwin; Bosio, Alessio; Polverini, Davide

    2011-03-01

    The ALPINE project is developing innovative fiber lasers for the scribing of new thin film photovoltaic modules with the aims to push forward the European research and development of fiber laser systems and solar energy exploitation. The fiber lasers will be based on photonic crystal fibers, which are characterized by unusual and interesting light guiding properties exploited to deliver high power with excellent beam quality and high resonator stability and efficiency, and will be applied to substitute mechanical scribing steps in the photovoltaic module production. In addition, new photovoltaic thin film technologies is applied, which is based on cadmium telluride and copper indium diselenide materials. With a potential conversion efficiency just below that of crystalline silicon, these new material approaches are ready to enter the market with low manufacturing costs for immediate economic or environment impact.

  6. A new EU-funded project for enhanced real-time imaging for radiotherapy

    CERN Multimedia

    KTT Life Sciences Unit

    2011-01-01

    ENTERVISION (European training network for digital imaging for radiotherapy) is a new Marie Curie Initial Training Network coordinated by CERN, which brings together multidisciplinary researchers to carry out R&D in physics techniques for application in the clinical environment.   ENTERVISION was established in response to a critical need to reinforce research in online 3D digital imaging and to train professionals in order to deliver some of the key elements for early detection and more precise treatment of tumours. The main goal of the project is to train researchers who will help contribute to technical developments in an exciting multidisciplinary field, where expertise from physics, medicine, electronics, informatics, radiobiology and engineering merges and catalyses the advancement of cancer treatment. With this aim in mind, ENTERVISION brings together ten academic institutes and research centres, as well as the two leading European companies in particle therapy, IBA and Siemens. &ldq...

  7. Identifying and prioritizing barriers to implementation of smart energy city projects in Europe: An empirical approach

    International Nuclear Information System (INIS)

    Mosannenzadeh, Farnaz; Di Nucci, Maria Rosaria; Vettorato, Daniele

    2017-01-01

    Successful implementation of smart energy city projects in Europe is crucial for a sustainable transition of urban energy systems and the improvement of quality of life for citizens. We aim to develop a systematic classification and analysis of the barriers hindering successful implementation of smart energy city projects. Through an empirical approach, we investigated 43 communities implementing smart and sustainable energy city projects under the Sixth and Seventh Framework Programmes of the European Union. Validated through literature review, we identified 35 barriers categorized in policy, administrative, legal, financial, market, environmental, technical, social, and information-and-awareness dimensions. We prioritized these barriers, using a novel multi-dimensional methodology that simultaneously analyses barriers based on frequency, level of impact, causal relationship among barriers, origin, and scale. The results indicate that the key barriers are lacking or fragmented political support on the long term at the policy level, and lack of good cooperation and acceptance among project partners, insufficient external financial support, lack of skilled and trained personnel, and fragmented ownership at the project level. The outcome of the research should aid policy-makers to better understand and prioritize implementation barriers to develop effective action and policy interventions towards more successful implementation of smart energy city projects. - Highlights: • A solid empirical study on the implementation of European smart energy city projects. • We found 35 barriers in nine dimensions; e.g. policy, legal, financial, and social. • We suggested a new multi-dimensional methodology to prioritize barriers. • Lacking or fragmented political support on the long term is a key barrier. • We provided insights for action for project coordinators and policy makers.

  8. Seismology in Schools an integrated approach to funding developing and implementing a coordinated programme for teachers and high school students

    Science.gov (United States)

    Blake, T. A.; Jones, A. G.; Campbell, G.

    2010-12-01

    Statistics in Ireland show that physics at Advanced Level in Secondary Schools is declining in popularity and is the most likely subject to be cut first from the curriculum in a curriculum readjustment by school authorities. In an attempt to attract students to study Earth science and seismology the School of Cosmic Physics, DIAS embarked on an outreach programme in 2007 to promote Earth science, particularly seismology, in schools at both Primary and Secondary Levels. Since its inception, DIAS's Seismology in Schools programme has been very well received, with seismometers installed in over fifty schools across the State. Although this number may appear small, given that the population of Ireland is 4M this number of 1 per 80,000 compares favourably with the U.K. (70 in a population of 70M, 1 per 1M) and the U.S.A. (200 in a population of 300M, 1 per 1.5M) with an penetration of 15-20 times greater. The phenomenal success of our Seismology in Schools programme has been helped significantly by the support we have received from the British Geological Survey (BGS) and IRIS (Incorporated Research Institutions for Seismology) in terms of hardware, software and advice. Similarly, the programme would be a pale reflection of what it is today if the Directors of the Educational Centres (ATECI, Association of Teacher's/Education Centres in Ireland) across Ireland had not become enthused and funded the purchase of 34 additional seismometers, and the Geological Survey of Ireland purchased a further six. Also, funding support from Discover Science and Engineering (DSE) was absolutely critical for us to roll out this hugely enlarged programme of 50 seismometers from the originally envisioned four. As this programme is an initiation into seismology for students, it is important to stress that the seismometer is not used in the schools as a professional recording instrument but helps students visualize what seismology and the recording of earthquakes comprises. Essential to the

  9. What Happens When the Musicians Leave? Case Study of a Jessie’s Fund Project to Develop Teachers’ Skills and Confidence

    Directory of Open Access Journals (Sweden)

    Tom Northey

    2013-07-01

    Full Text Available This article describes a project delivered by Jessie’s Fund, a UK charity which supports children through music therapy and creative music work. The project took place between January and July 2012 and involved staff and pupils from a special school in the north of England. The article describes briefly how music is delivered in special schools across the UK and explains some of the challenges Jessie’s Fund has faced in having a lasting impact on how schools cover the music curriculum for children with complex needs. In 2012 Jessie’s Fund partnered with a special school in the north of England to design a new approach which focused intensively on the development needs of staff. Jessie’s Fund musicians visited pairs of staff over a period of six months to build their skills and confidence in leading music sessions with their pupils. The project was considerably more effective than some previous ‘musician-led’ activities and had a significant, whole-school impact. This article describes the work that took place, the responses from the staff involved and how Jessie’s Fund intends to use this learning for future projects.

  10. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  11. Lessons from implementation of ecohealth projects in Southern Africa: A principal investigator's perspective.

    Science.gov (United States)

    Chimbari, Moses John

    2017-11-01

    Ecohealth projects are designed to garner ownership among all stakeholders, such as researchers, communities, local leadership and policy makers. Ideally, designs should ensure that implementation goes smoothly and that findings from studies benefit the stakeholders, particularly bringing changes to the communities researched. Paradoxically, the process is fraught with challenges associated with implementation. Notwithstanding these challenges, evidence from projects implemented in southern Africa justify the need to invest in the subject of ecohealth. This paper describes and discusses a principal investigator's experience of leading ecohealth projects in Zimbabwe between 2002 and 2005, in Botswana between 2010 and 2014 and in South Africa (ongoing). The discourse is centred on issues of project management and leadership, transdisciplinarity, students' involvement, data management, community engagement, dissemination of research findings and the role of institutions in project management and implementation. The paper concludes that the ecohealth approach is valuable and should be encouraged making the following recommendations; 1) principal investigators must have a good understanding of socio-ecological systems, have excellent project management and writing skills, 2) more than one PI should be involved in the day-to-day running of the project in order to avoid disruption of project activities in the event that the PI leaves the project before it ends, 3) researchers should be trained in ecohealth principles and methodologies at the time of building the research teams, 4) full proposals should be developed with active participation of communities and stakeholders in order to develop a shared vision, 5) involvement of postdoctoral fellows and dedicated researchers with postgraduate students should be encouraged to avoid situations where some objectives are not fully addressed because of the narrow nature of students' work; and 6) citizen science should be

  12. Assessment of an implementation project for a voip system: a case in the food industry

    Directory of Open Access Journals (Sweden)

    Tiago José Menezes Gonçalves

    2011-09-01

    Full Text Available In the twenty-first century, all organizations are affected directly or indirectly by the use of information technology and communication (ICT. The preparation of good projects to implement these technologies is relevant for a company to remain competitive compared to its competitors. In this context, this study analyzes the economic viability for the implementation of a communication system based on VoIP (Voice on Internet Protocol in a food company of the industrial sector. In this way, we compared the existing telephony system in the company with a proposed project for implementation of a VoIP system. Therefore, we performed the modeling of costs incurred through of equations and we used as indicators of project viability the break-even point analysis, the payback period analysis, the net present value and the internal rate of return. As result, it was concluded that the implementation of VoIP-based systems can result in large cost saving, allowing rapidly recovering of the capital invested in the project. This conclusion was confirmed by the analysis of all the indicators cited above, which allowed to recommend the implementation of the project and verify the applicability of cost models developed.

  13. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  14. The project organization as a policy tool in implementing welfare reforms in the public sector.

    Science.gov (United States)

    Jensen, Christian; Johansson, Staffan; Löfström, Mikael

    2013-01-01

    Organizational design is considered in policy literature as a forceful policy tool to put policy to action. However, previous research has not analyzed the project organization as a specific form of organizational design and, hence, has not given much attention to such organizations as a strategic choice when selecting policy tools. The purpose of the article is to investigate the project as a policy tool; how do such temporary organizations function as a specific form of organization when public policy is implemented? The article is based on a framework of policy implementation and is illustrated with two welfare reforms in the Swedish public sector, which were organized and implemented as project organizations. The case studies and the analysis show that it is crucial that a project organization fits into the overall governance structure when used as a policy tool. If not, the project will remain encapsulated and will not have sufficient impact on the permanent organizational structure. The concept of encapsulation indicates a need to protect the project from a potential hostile environment. The implication of this is that organizational design as a policy tool is a matter that deserves more attention in the strategic discussion on implementing public policies and on the suitability of using certain policy tools. Copyright © 2012 John Wiley & Sons, Ltd.

  15. 40 CFR 93.128 - Traffic signal synchronization projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Traffic signal synchronization... synchronization projects. Traffic signal synchronization projects may be approved, funded, and implemented without... include such regionally significant traffic signal synchronization projects. ...

  16. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  17. Key Success Factors of Renewable Energy Projects Implementation in Rural Areas of Indonesia

    Directory of Open Access Journals (Sweden)

    Wati Hermawati

    2017-12-01

    Full Text Available This paper is an exploratory study on renewable energy implementation in the rural areas of Indonesia. The study aim was to investigate the factors contributing to the sustainability of renewable energy projects in the rural areas. It mostly uses a qualitative approach. Primary data was mainly obtained from in-depth interviews conducted in site areas with the project owners, project managers, a key person in each local government, industry representatives, and the local community, including local leaders and users of renewable energy. Secondary data in the form of various official project reports was also used. The results indicated that the success of energy project implementation lay not only in good technology performance and long-term maintenance, but was also highly dependent on six key factors, namely: (1 project planning and development; (2 community participation; (3 active communication and beneficiaries; (4 availability of maintenance program, workshop and technician; (5 project management and institutionalization; (6 local government support and networks. The findings from this study provide useful insights to all stakeholders involved in the implementation of renewable energy technology for the rural areas in Indonesia.

  18. Biomass energy projects for joint implementation of the UN FCCC [Framework Convention on Climate Change

    International Nuclear Information System (INIS)

    Swisher, Joel N.; Renner, Frederick P.

    1998-01-01

    The UN Framework Convention on Climate Change (FCCC) allows for the joint implementation (JI) of measures to mitigate the emissions of greenhouse gases. The concept of JI refers to the implementation of such measures in one country with partial or full financial and/or technical support from another country, potentially fulfilling some of the supporting country's emission-reduction commitment under the FCCC. This paper addresses some key issues related to JI under the FCCC as they relate to the development of biomass energy projects for carbon offsets in developing countries. Issues include the reference case or baseline, carbon accounting and net carbon storage, potential project implementation barriers and risks, monitoring and verification, local agreements and host-country approval. All of these issues are important in project design and evaluation. We discuss briefly several case studies, which consist of a biomass-fueled co-generation projects under development at large sugar mills in the Philippines, India and Brazil, as potential JI projects. The case studies illustrate the benefits of bioenergy for reducing carbon emissions and some of the important barriers and difficulties in developing and crediting such projects. Results to date illustrate both the achievements and the difficulties of this type of project. (author)

  19. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    International Nuclear Information System (INIS)

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  20. Gas Regional Initiative. North West Regional Energy Market. Transmission Transparency Project. First Implementation Report

    International Nuclear Information System (INIS)

    2008-07-01

    The purpose of this report is to comment on the implementation of the TSO Transmission Transparency Project. In December 2007 sixteen TSOs presented a project plan which committed them to publishing information on capacity availability and gas flows at crossborder interconnection points in the North-West gas region. The data types to be published were agreed between TSOs and network users. It was agreed that TSOs would release new information on capacity and actual gas flows at crossborder interconnection points. The TSOs have committed to publishing the agreed information by three project milestones May, September or December 2008. At the end of May 2008 the TSOs submitted initial data to Ofgem (Office of the Gas and Electricity Markets) on implementation. This report presents the data submitted by the TSOs, provides comment on implementation progress and explains the next steps. This report does not approve or guarantee the accuracy of the data submitted by TSOs

  1. Appreciation of a Child’s Journey: Implementation of a Cardiac Action Research Project

    Directory of Open Access Journals (Sweden)

    Kate Alexa Dengler

    2012-01-01

    Full Text Available The aim of this paper is to provide an overview of the phases of the action research process involved in developing, implementing, and evaluating the Heart Beads program. The aim of the project is to enrich the hospital experience of children with cardiac conditions. Heart Beads involves children receiving unique beads specific to each cardiac treatment, procedure or event in recognition of their experiences, and endurance. An action research approach, involving a partnership between clinicians and researchers and emphasising the involvement of patients and their families, was used to guide the Heart Beads program. The project followed the five phases of action research: identification, investigation, program development, implementation, and evaluation. Heart Beads began as a small project which continues to grow in popularity and significance with children at a tertiary paediatric hospital in Sydney, Australia. The program is now being implemented nationwide with the vision that all Australian children hospitalised with cardiac conditions can benefit from Heart Beads.

  2. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  3. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  4. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  5. Using implementation tools to design and conduct quality improvement projects for faster and more effective improvement.

    Science.gov (United States)

    Ovretveit, John; Mittman, Brian; Rubenstein, Lisa; Ganz, David A

    2017-10-09

    Purpose The purpose of this paper is to enable improvers to use recent knowledge from implementation science to carry out improvement changes more effectively. It also highlights the importance of converting research findings into practical tools and guidance for improvers so as to make research easier to apply in practice. Design/methodology/approach This study provides an illustration of how a quality improvement (QI) team project can make use of recent findings from implementation research so as to make their improvement changes more effective and sustainable. The guidance is based on a review and synthesis of improvement and implementation methods. Findings The paper illustrates how research can help a quality project team in the phases of problem definition and preparation, in design and planning, in implementation, and in sustaining and spreading a QI. Examples of the use of different ideas and methods are cited where they exist. Research limitations/implications The example is illustrative and there is little limited experimental evidence of whether using all the steps and tools in the one approach proposed do enable a quality team to be more effective. Evidence supporting individual guidance proposals is cited where it exists. Practical implications If the steps proposed and illustrated in the paper were followed, it is possible that quality projects could avoid waste by ensuring the conditions they need for success are in place, and sustain and spread improvement changes more effectively. Social implications More patients could benefit more quickly from more effective implementation of proven interventions. Originality/value The paper is the first to describe how improvement and implementation science can be combined in a tangible way that practical improvers can use in their projects. It shows how QI project teams can take advantage of recent advances in improvement and implementation science to make their work more effective and sustainable.

  6. ECONOMIC ASPECTS OF THE IMPLEMENTATION OF THE RURAL DEVELOPMENT PROGRAMME 2014–2020. REMINISCENCES AND PROJECTION

    Directory of Open Access Journals (Sweden)

    Sebastian Stępień

    2016-12-01

    Full Text Available The second pillar of the Common Agricultural Policy is an important element of support for Polish rural areas, due to the need to improve the competitiveness of agricultural producers, to transform the employment structure, to boost infrastructure development and to implement tasks related to the protection of the environment. Thus, the size of the funds of the Rural Development Programme (RDP for 2014–2020 and their allocation to different tasks is essential for the future of rural areas. The aim of the article was to evaluate the RDP for 2014–2020 from the point of view of the potential economic consequences of its implementation. This rating was made in two areas: the budget, and the construction of selected activities. Data on the budget and the allocation of funds in the new financial period indicate that the RDP limits expenditures on some of the objectives, primarily related to infrastructure and entrepreneurship. The priority actions are, however, pro-investment and modernization, and improving the position of farmers in the food chain. There are also programs of a social nature, aimed at small farms and activities with low added value (e.g. less favored areas, or LFA. Reducing the budget of the RDP forced implementation of some solutions, e.g. degressive payments and limits on the area and economic size of farms; thereby both the smallest and larger farms could be excluded from part of the support.

  7. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  8. Economics of forests and REDD+ projects: Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2012-11-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. (Author)

  9. United States-Mexico Border Diabetes Prevalence Survey: lessons learned from implementation of the project.

    Science.gov (United States)

    de Cosío, Federico G; Díaz-Apodaca, Beatriz A; Ruiz-Holguín, Rosalba; Lara, Agustín; Castillo-Salgado, Carlos

    2010-09-01

    This paper reviews and discusses the main procedures and policies that need to be followed when designing and implementing a binational survey such as the United States of America (U.S.)-Mexico Border Diabetes Prevalence Study that took place between 2001 and 2002. The main objective of the survey was to determine the prevalence of diabetes in the population 18 years of age or older along U.S.-Mexico border counties and municipalities. Several political, administrative, financial, legal, and cultural issues were identified as critical factors that need to be considered when developing and implementing similar binational projects. The lack of understanding of public health practices, implementation of existing policies, legislation, and management procedures in Mexico and the United States may delay or cancel binational research, affecting the working relation of both countries. Many challenges were identified: multiagency/multifunding, ethical/budget clearances, project management, administrative procedures, laboratory procedures, cultural issues, and project communications. Binational projects are complex; they require coordination between agencies and institutions at federal, state, and local levels and between countries and need a political, administrative, bureaucratic, cultural, and language balance. Binational agencies and staff should coordinate these projects for successful implementation.

  10. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  11. The funding of dangerous nuclear projects. Nuclear trade and safety: the role of French private banks. What are we talking about?

    International Nuclear Information System (INIS)

    Philippe, Isabelle

    2011-01-01

    Countries which export nuclear technologies, notably France, have developed mechanisms of financial support to incite private banks to finance the sale of reactors to foreign countries, notably EPRs in the case of France. After having briefly introduced this issue, and dealing with the French case, this publication indicates the concerned banks, and outlines that some of them finance nuclear projects which have been assessed by NGOs as dangerous in terms of nuclear safety. It notably presents the Angra 3 project in Brazil: its cost, its planning, its main safety problems (obsolete technology, building authorization awarded without any actual safety analysis, situation of conflict of interest for the Brazilian regulator). It also presents the Jaitapur project in India in which Areva is as well involved: costs, funding, planning, main risks (seismic risk area, safety level much lower than the one required in France, controversy on the impact study). The document finally explains why banks must not fund nuclear projects

  12. [Analysis of funding of projects on obstetrics and gynecology supported by National Natural Science Foundation of China from 2007 to 2016].

    Science.gov (United States)

    Qin, S H; Huang, Q S; Yao, S Z

    2017-04-25

    Objective: To summarize the funding of scientific research projects on obstetrics and gynecology by National Natural Science Foundation of China (NSFC) from 2007 to 2016 and to display the hotspots of scientific research on obstetrics and gynecology. Methods: A systemic search was performed for the information of projects supported by NSFC from 2007 to 2016. The indicators for analysis included the number of projects, total investment, project categories, research units and research field. The research direction of each project was decided based on title, summary and key words provided by the profile of each project. Results: The total investment on obstetrics and gynecology by NSFC was 23.214 million with a total of 82 projects in 2007. It increased year by year and reached the peak in 2014 (359 projects 208.990 million). The investment and number of projects remained stable after 2014. General projects (1 109 projects 608.000 million) formed the majority of projects. Youth science fund projects (1 035 projects 214.976 million) increased steadily and the number was nearly equal to general projects. There were only a small amount of key projects (20 projects 54.720 million) and major projects (7 projects 38.400 million). The investment varied in different research units. The greatest 10 units (less than 6% of total), including 7 comprehensive universities, 2 medical universities and 1 institute of medicine, got 1 113 projects invested (43.84% of total, 1 113/2 539). The hot areas like gynecological tumor (920 projects 350.615 million), hypertensive disorders complicating pregnancy (91 projects 37.470 million) and polycystic ovarian syndrome (77 projects 29.540 million) were more likely to receive investment, while some interdisciplinary science like maternal and child health (28 projects 12.050 million), imaging and biomedicine (37 projects 14.770 million) began to achieve attention in recent years. Conclusions: The number of researches invested will be increased

  13. Implementing LCFF: Building Capacity to Realize the Promises of California's New Funding System. Policy and Practice Brief

    Science.gov (United States)

    Knudson, Joel

    2014-01-01

    California's Local Control Funding Formula (LCFF) has introduced changes that alter the conditions under which educators, administrators, and community leaders approach their roles in the K-12 education system. Consequently, leaders at all levels may need to build the capacity--both the knowledge and skills and the resources--that they need to…

  14. Early Implementation Experiences of the 2010 Teacher Incentive Fund Grantees. NCEE Study Snapshot. NCEE 2014-4021

    Science.gov (United States)

    National Center for Education Evaluation and Regional Assistance, 2014

    2014-01-01

    The Teacher Incentive Fund (TIF) provides grants to support performance-based compensation systems for teachers and principals in high-need schools. The study measures the impact of pay-for-performance bonuses as part of a comprehensive compensation system within a large, multisite random assignment study design. The treatment schools were to…

  15. Evaluation of the Teacher Incentive Fund: Implementation and Impacts of Pay-for-Performance after Two Years

    Science.gov (United States)

    Chiang, Hanley; Wellington, Alison; Hallgren, Kristin; Speroni, Cecilia; Herrmann, Mariesa; Glazerman, Steven; Constantine, Jill

    2016-01-01

    Recent efforts to attract and retain effective educators and to improve teaching practices have focused on reforming evaluation and compensation systems for teachers and principals. In 2006, Congress established the Teacher Incentive Fund (TIF), which provides grants to support performance-based compensation systems for teachers and principals in…

  16. 32 CFR 37.685 - May I allow for-profit firms to purchase real property and equipment with project funds?

    Science.gov (United States)

    2010-07-01

    ... property and equipment with project funds? 37.685 Section 37.685 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Affecting Participants' Financial, Property, and Purchasing Systems Property § 37.685 May I...

  17. Business Model Canvas and Strategies to Develop Biodiesel Industry of PT. XYZ in Order to Implement CPO Supporting Fund Policy

    Directory of Open Access Journals (Sweden)

    Aman Mustika

    2017-09-01

    Full Text Available Biodiesel is considered as one of the alternative eco-friendly fuels. Besides, the government also issued policy related to biodiesel that is CPO Supporting Fund (CSF Policy. The aim of the research is to identify Business model canvas (BMC biodiesel industry in PT XYZ and to know the strategies to develop business from biodiesel industry in line with the CPO supporting fund policy. The analysis tool used in this research is BMC, SWOT and Quantitative Strategic Planning Matrix (QSPM. The research results in identifying BMC of PT XYZ is customer segment that the company serves in the form of domestic as well international customers. The value the company offers is biodiesel quality that is in accordance with SNI standard and the distribution is at the company’s cost; the relationship built with the customers is by communities and co-creation; the marketing network through stock exchanges and commodity exchanges; the revenue obtained from selling biodiesel and the price difference between biodiesel and solar from BPDPKS; the company’s resources are human resource, raw material resource, and financial resource; the main activities carried out by the company is CPO process to become biodiesel and sale; the company’s partners are GAPKI, BPDPKS and APROBI; the cost structure is operational cost, workers’ salary, and CPO levy fund. Furthermore, the strategy to develop biodiesel industry in line with the rapid increase of competitiveness is to increase the biodiesel production capacity and communication improvement and CRM to improve customers’ service.Keywords: biodiesel, CPO supporting fund (CSF, levy fund, vegetable oil (BBN, business model canvas (BMC

  18. ANALYTICAL AND SCIENTIFIC REVIEW OF PROJECTS AND PROGRAMMES ON CHANGES STRATEGY IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    MLODETSKYY V. R.

    2017-01-01

    Full Text Available Formulation of the problem. Sustainable and successful functioning of the organization in today's competitive market conditions is possible if the organization is an open dynamic system capable of timely and adequately adapt to changes in the environment, this organization should initiate the implementation of innovations, both in production and organizational structure. Most suited for these conditions are project-oriented organizations, when the program's development strategy is developed with a detailed individual relatively independent stages, which are implemented as part of projects. In accordance with the development and improvement of the organization of control systems in the direction of increasing emphasis on the development strategy in relation to operating activities is an important task. Goal and tasks. Explore the hierarchical control system of project-oriented organization towards establishing information flows combine program management system with project management subsystems, included in this program. Conclusions. Concretized the concept of "program" and "project" as a result assumed that the program management is a permanent process in the organization that is adaptable to external changes, and project management (as defined is temporary, so the project management structure are subject to program management structures and are not permanent in the organization's management system.

  19. The Formation of the Model of Diagnosing the Results Implementation of of Consulting Projects for Enterprises

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-11-01

    Full Text Available In the article the graphic-analytical model of diagnostics of results of implementation of consulting projects is formed, which allows to: take into consideration interests of participants to the project on choice of methods and methodologies of diagnosing; allocate alternative sets of business indicators for each object of impact in terms of consulting project; establish economic and non-economic criteria for evaluating the effectiveness of consulting, as well as monitoring of indicators and automated processing of diagnostic results to control deviations from the optimal values of the diagnosed project results. A structural-logical model of formation of alternative sets of indicators and choice of indicators for diagnostics of results of consulting projects has been developed. The elements of the enterprise management system have been codified to harmonize the corresponding indicators with their subsequent combination within the proposed sets. The control system objects and their elements have been allocated. The groups of indicators according to the technology of Balanced Score Card (BSC have been presented. The prospect of further research is the economic assessment of implementation of the diagnosed consulting projects, which will reveal the links between the parameters of production-economic activity and the assessment of projects, and allows choose the most significant ones.

  20. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  1. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  2. Project IVOR - Implementing victim-oriented reform of the criminal justice system in the European Union

    NARCIS (Netherlands)

    Biffi, Emanuela; Mulder, Eva; Pemberton, Antony; Santos, Manuela; Valério, Mafalda; Vanfraechem, Inge; van der Vorm, Benny

    2016-01-01

    Project IVOR – Implementing victim-oriented reform of the criminal justice system in the European Union (2014-2016) offers an overview of current research into and with victims’ rights and services, identifying lacunas in the knowledge base and offering a model which can serve to connect experience

  3. Implementing CDM projects. A guidebook to host country legal issues; CDM - Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Curnow, P [Baker and McKenzie, London (United Kingdom); Hodes, G [UNEP Risoe Centre on Energy, Climate and Sustainable Development, DTU, Roskilde (Denmark)

    2009-08-15

    The Clean Development Mechanism (CDM) continues to evolve organically, and many legal issues remain to be addressed in order to maximise its effectiveness. This Guidebook explains through case studies how domestic laws and regulatory frameworks in CDM Host Countries interact with international rules on carbon trading, and how the former can be enhanced to facilitate the implementation and financing of CDM projects. (author)

  4. Improving Astronomy Achievement and Attitude through Astronomy Summer Project: A Design, Implementation and Assessment

    Science.gov (United States)

    Türk, Cumhur; Kalkan, Hüseyin; Iskeleli', Nazan Ocak; Kiroglu, Kasim

    2016-01-01

    The purpose of this study is to examine the effects of an astronomy summer project implemented in different learning activities on elementary school students, pre-service elementary teachers and in-service teachers' astronomy achievement and their attitudes to astronomy field. This study is the result of a five-day, three-stage, science school,…

  5. Implementing the "Marketing You" Project in Large Sections of Principles of Marketing

    Science.gov (United States)

    Smith, Karen H.

    2004-01-01

    There is mounting pressure on business education to increase experiential learning at the same time that budget constraints are forcing universities to increase class size. This article explains the design and implementation of the "Marketing You" project in two large sections of Principles of Marketing to bring experiential learning into the…

  6. Implementing the Project Approach: A Case Study of Hybrid Pedagogy in a Hong Kong Kindergarten

    Science.gov (United States)

    Chen, Jennifer J.; Li, Hui; Wang, Jing-ying

    2017-01-01

    The Project Approach has been promoted in Hong Kong kindergartens since the 1990s. However, the dynamic processes and underlying mechanisms involved in the teachers' implementation of this pedagogical method there have not yet been fully investigated. This case study of one typical kindergarten in Hong Kong documented how and why eight teachers…

  7. Solution and implementation of project ''Simulator of WWER-440 nuclear power plant''

    International Nuclear Information System (INIS)

    Koukal, V.

    1985-01-01

    The time data are given of the development and construction of the simulator of a WWER-440 nuclear power plant unit. The individual tasks are summed up which are related to the project implementation, and cooperating institutions and enterprises are listed. (J.C.)

  8. Examining Success Factors Related to ERP Implementations in Higher Education Shared Services Projects

    Science.gov (United States)

    Stoyanoff, Dawn Galadriel Pfeiffer

    2012-01-01

    This study examined the enterprise resource planning (ERP) implementations that utilized a shared services model in higher education. The purpose of this research was to examine the critical success factors which were perceived to contribute to project success. This research employed a quantitative non-experimental correlational design and the…

  9. Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

    Directory of Open Access Journals (Sweden)

    Mohammed Sani

    2018-03-01

    Full Text Available Public Private Partnership (PPP Housing scheme in Nigeria is intended to complement government effort toward increasing housing stock and providing affordable housing in the country. However, Bauchi state government adopted the construction of 5,000 phases PPP Housing. But 6 years after the commencement of the scheme, only a few numbers of housing units were completed and commissioned. Therefore, it becomes imperative to carry out research on the impact level of those factors affecting the implementation of the scheme. The aim of the study is to investigate impact level of factors affecting the implementation of PPP housing projects in Bauchi state with a view to find out possible ways that will improve the implementation of the scheme. The descriptive and explorative research design was adopted for this study. 54 structured Questionnaires were administered to construction professional’s staff under private housing developers and relevant government agencies in Bauchi state. 42 valid Questionnaires were retrieved and analysed with SPSS software. The result of the quantitative data analysis shows that creation of favourable investment environment and government support have very high Impact on the implementation of Bauchi PPP housing projects. Therefore, this study recommends that government and other stakeholders should give more attention to the creation of favourable investment environment, support in policy formulation and managerial strategies in the future for improving the implementation of PPP housing projects.

  10. Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-08-01

    Full Text Available The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract The question is, was the optimum implementation accomplished? The provision for the success of the project is how are the daily activities managed by the three stakeholders of the project (contractor, owner, and consultant and their technical and practical capability to attain the balance of the project fundamental points (cost, time and quality taking into account the project objectives that were set by the owner. Despite the way, logical framework management and project’s major steps there is a group of elements which become major measures to determine the success or failure of the project, the research interested in these elements by a thorough study of references related to the success of a constructional project. To reinforce the theoretical study a field assessment of the housing project; this led to the recognition of the major elements that caused breaches of the evaluation criteria. The closed questionnaire and the regular forms based on the data and information collected through the theoretical review and the closed questionnaire to conclude and examine some concepts related by assessing the quality of building materials used in residential investment projects through the stages (planning - design-implementation Through the research a lot of deductions were made, the most important is that there cannot be an evaluation system

  11. [Prioritization and Consentation of Criteria for the Appraisal, Funding and Evaluation of Projects from the German Innovationsfonds: A multi-perspective Delphi study].

    Science.gov (United States)

    Schmitt, J; Petzold, T; Nellessen-Martens, G; Pfaff, H

    2015-09-01

    The German Innovationsfonds provides the chance for evidence-based developments of the German healthcare system. Prioritization of recommendations for an effective, efficient, fair, transparent, and sustainable granting of funds through a transparent, evidence-driven consensus-process involving all relevant stakeholder groups. Representatives from health and research policy, payers, patient representatives, healthcare providers, and scientists were invited to nominate participants for an electronic 3 round iterative Delphi-study to prioritize the thematic focus, requirements concerning study methods, the team of applicants, evaluation, utilization of study results, and for the selection of reviewers. Criteria considered as relevant by at least 60% of the panel (consensus definition) in the first 2 Delphi rounds were rated as facultative, preferable, or obligatory criteria for project funding. Data were analyzed descriptively. ( Datenbank Versorgungsforschung Deutschland VfD_15_003561). All invited stakeholder groups except payers participated. 34 (85%) of 40 nominated representatives participated in the Delphi-study. A total of 64 criteria were consented as relevant for project review and funding concerning the thematic focus (n=28), methodological requirements (n=13), requirements for applicants (n=4), for the evaluation (n=4), utilization (n=6), and selection of peer reviewers (n=9). It is the collective responsibility of all stakeholders to spend the designated funds as efficient and sustainable as possible. The consented recommendations shall serve decision makers as a resource for the granting of funds and the evaluation of the Innovationsfonds. © Georg Thieme Verlag KG Stuttgart · New York.

  12. Chromosomocentric approach to overcoming difficulties in implementation of international project Human Proteome

    Directory of Open Access Journals (Sweden)

    A. I. Archakov

    2013-12-01

    Full Text Available The international project Human Proteome (PHP, being a logical continuation of the project Human Genome, was started on September 23, 2010. In correspondence with the genocentric approach, the PHP aim is to prepare a catalogue of all human proteins and to decipher a network of their interactions. The PHP implementation difficulties arise because the research subject itself – proteome – is much more complicated than genome. The major problem is the insufficient sensitivity of proteome methods that does not allow detecting low- and ultralow-copy proteins. Bad reproducibility of proteome methods and the lack of so-called “gold standard” is the second major complicacy in PHP implementation. The third problem is the dynamic character of proteome, its instabili­ty in time. The paper deals with possible variants of overcoming these complicacies, preventing from successful implementation of PHP.

  13. Joint implementation demo project between Denmark and Estonia - Phase 1. Final report

    International Nuclear Information System (INIS)

    2003-09-01

    This project is meant to contribute to form the basis of co-operation between Denmark and Estonia as regards Joint Implementation (JI) and thus gather experience in preparation for practical use of JI. A number of questions can be raised for discussion within this project: What is the scope for JI? What is the role of the host country government? Will JI survive the emerging Emission Trading? The project report gives a status of the present situation within the area of JI both internationally and in Estonia, including a resume of the Estonian National Climate Programme. Furthermore, a stakeholder analysis is presented, along with an illustration of the effect of Joint Implementation in the various energy sectors. (BA)

  14. Development and implementation of the regulatory control of sources in Latin American Model Project countries

    International Nuclear Information System (INIS)

    Ferruz Cruz, P.

    2001-01-01

    After a general assessment of the situation regarding radiation safety and the radiation protection infrastructure in Latin American countries, several of them were invited to participate in a Model Project oriented, in some cases, towards establishing a mechanism for national regulatory control of radiation sources, and in others, towards upgrading their national control programme. All these activities aimed at reaching an effective and sustainable radiation protection infrastructure based on international basic safety standards. The paper presents a general overview of the current situation with regard to radiation protection within the Model Project countries in Latin America after almost five years of activities. It includes: the implementation of regulatory issues; the control of occupational, medical and public exposures; emergency response and waste safety issues. The paper also presents some lessons learned during implementation concerning the numerous activities involved in this interregional project. (author)

  15. Institutional repository in communication: the REPOSCOM project implemented in the digital libraries federation of communication science

    Directory of Open Access Journals (Sweden)

    Sueli Mara Soares Pinto Ferreira

    2007-01-01

    Full Text Available Considering the conceptualization, characterization and context of the institutional repositories (IR this paper discuss the procedures, policies and strategies delineated to the implementation of IR in a research environment. The object of discussion is the project called Reposcom - Institutional Repository of Intercom (Brazilian Society of Interdisciplinary Studies of Communication – which is part of a broader project managed by the Portcom – Information Network in Communication Sciences of Countries of Portuguese Language – and called Digital Libraries Federation in the Communication Sciences. Aiming to share the knowledge and experience acquired with the implementation of the Reposcom, this paper describes its work activities, the decisions made, the customization of the software DSpace (the technological solution and the initial results achieved with the project.

  16. Implementing an interprofessional first-year teamwork project: some key reflections.

    Science.gov (United States)

    McNaughton, Susan Maree

    2013-09-01

    Implementing an interprofessional teamwork project for first-year students presents pedagogical and practical challenges. While transferable skills and attributes are important, engagement of students with limited professional experience in teamwork depends on relevance to current learning needs. This report outlines principles learned from planning and implementing a teamwork project for an interprofessional health administration and service development course. Practising interprofessional teamwork as leaders and teachers, aligning with previous, current and future teamwork content and processes and responding to student feedback and achievement have been the key factors in shaping the project over three semesters. Face-to-face and online interprofessional teamwork learning has necessitated developing resources that support self-direction, using familiar technology and providing enabling physical environments. Implications for first-year interprofessional teamwork are that structured well-resourced processes, responsiveness and alignment of learning all improve student outcomes.

  17. Practical implementation of joint projects for offshore wind; Praktiskt genomfoerande av gemensamma projekt foer havsbaserad vindkraft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    Cooperation mechanisms are part of the renewable s directive and aims to member countries to cooperate on renewable energy to meet their national targets a cost effective way. The Energy Agency has in previous assignments analyzed the possibilities and limitations of cooperation mechanisms and other countries' interest in the cooperation mechanisms. In the Appropriation Directions for 2013, the Energy Agency has been asked to contribute to the continued analysis and practical preparations for a possible cooperation with other member countries. The assignment covers several different types of cooperation. This report represents the Agency's accounting of the part of the commission on cooperation through joint projects. This part include, in consultation with the industry to develop a proposal for the practical use for the implementation of possible joint projects for offshore wind power. The mission aims to create greater clarity and facilitate the possible implementation of joint projects.

  18. Implementing an authentic research project on eastern coyotes at an urban high school

    Directory of Open Access Journals (Sweden)

    David L. Eatough

    2008-01-01

    Full Text Available The need for inquiry oriented authentic activities is imperative to engage high school students in the active involvement and associated learning of science. Herein, we describe our experience of involving high school students in the process of studying wild coyotes in and around the communities where they live. We found that many became aware and familiar with the program but few participated to the point of being contributing members of the scientific community. To make this project sustainable in the long-run three important things must happen: one, there must be reliable point person (such as a graduate student who can focus on the ecology side of the coyote project while others can focus on the educational components of the collaboration; two, mechanisms must be put in place to provide incentives for participants; and three, funding must be reliable and substantial over time.

  19. EFFECTIVENESS OF AGILE COMPARED TO WATERFALL IMPLEMENTATION METHODS IN IT PROJECTS: ANALYSIS BASED ON BUSINESS INTELLIGENCE PROJECTS

    Directory of Open Access Journals (Sweden)

    Kisielnicki Jerzy

    2017-10-01

    Full Text Available The global Business Intelligence (BI market grew by 7.3% in 2016 according to the Gartner report (2017. Today, organizations require better use of data and analytics to support their business decisions. Internet power and business trend changes have provided a broad term for data analytics - Big Data. To be able to handle it and leverage a value of having access to Big Data, organizations have no other choice than to get proper systems implemented and working. However, traditional methods are not efficient for changing business needs. Long time between project start and go-live causes a gap between initial solution blueprint and actual user requirements at the end of the project. This article presents the latest market trends in BI systems implementation by comparing agile with traditional methods. It presents a case study provided in a large telecommunications company (350 BI users and the results of a pilot research provided in the three large companies: media, digital, and insurance. Both studies prove that agile methods might be more effective in BI projects from an end-user perspective and give first results and added value in a much shorter time compared to a traditional approach.

  20. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  1. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  2. Using Quantitative Data in World Bank Per-Student Funding Reform Projects: Data, Designs and Dilemmas in Transition Countries

    Science.gov (United States)

    Levacic, Rosalind

    2014-01-01

    Since the late 1980s, education systems have increasingly moved to allocating funding for general education by means of a per-student formula. The trend started with developed economies and moved to transition and developing economies, where the World Bank has promoted the adoption of per-student funding (PSF). But promoting a particular reform,…

  3. Meeting the Challenges of Fiscal and Programmatic Sustainability: Lessons from Teacher Incentive Fund Grantees. The Harvesting Project

    Science.gov (United States)

    Schuermann, Patrick; Archibald, Sarah; Kluender, Ray; Ptak, Kirsten

    2011-01-01

    A total of 33 sites, including states, school districts, charter school coalitions, and other education organizations make up Cohorts 1 and 2 of the Teacher Incentive Fund (TIF). These sites received funds beginning in the fall of 2006 and spring of 2007 to redesign compensation programs for teachers and principals. The U.S. Department of…

  4. Implementing Brief Interventions in Health Care: Lessons Learned from the Swedish Risk Drinking Project

    Directory of Open Access Journals (Sweden)

    Per Nilsen

    2011-09-01

    Full Text Available The Risk Drinking Project was a national implementation endeavour in Sweden, carried out from 2004 to 2010, based on a government initiative to give alcohol issues a more prominent place in routine primary, child, maternity and occupational health care. The article describes and analyses the project. Critical factors that were important for the results are identified. The magnitude of the project contributed to its reach and impact in terms of providers’ awareness of the project goals and key messages. The timing of the project was appropriate. The increase in alcohol consumption in Sweden and diminished opportunities for primary prevention strategies since entry to the European Union in 1995 have led to increased expectations for health care providers to become more actively involved in alcohol prevention. This awareness provided favourable conditions for this project. A multifaceted approach was used in the project. Most educational courses were held in workshops and seminars to encourage learning-by-doing. Motivational interviewing was an integral aspect. The concept of risk drinking was promoted in all the activities. Subprojects were tailored to the specific conditions of each respective setting, building on the skills the providers already had to modify existing work practices. Nurses were afforded a key role in the project.

  5. Using implementation science as the core of the doctor of nursing practice inquiry project.

    Science.gov (United States)

    Riner, Mary E

    2015-01-01

    New knowledge in health care needs to be implemented for continuous practice improvement. Doctor of nursing practice (DNP) programs are designed to increase clinical practice knowledge and leadership skills of graduates. This article describes an implementation science course developed in a DNP program focused on advancing graduates' capacity for health systems leadership. Curriculum and course development are presented, and the course is mapped to depict how the course objectives and assignments were aligned with DNP Essentials. Course modules with rational are described, and examples of how students implemented assignments are provided. The challenges of integrating this course into the life of the school are discussed as well as steps taken to develop faculty for this capstone learning experience. This article describes a model of using implementation science to provide DNP students an experience in designing and managing an evidence-based practice change project. Copyright © 2015 Elsevier Inc. All rights reserved.

  6. PROJECT IMPLEMENTATION OF LEAN MANUFACTURING: A STUDY IN AUTOMOTIVE SUPPLY CHAIN

    Directory of Open Access Journals (Sweden)

    Marodin, G. A.

    2015-06-01

    Full Text Available Despite the fact that lean production (LP is widely used by companies from a broad number of countries and sectors, to achieve a mature LP project implementation is still considered hard to accomplish and sustain. The fact that LP is highly context dependent is one of the major difficulties that hinder its implementation. The extant knowledge about LP implementation from emerging markets is still murky and substantially lower than from developed countries This paper emphasizes LP in Brazil, one of the emerging economies where there is relatively little knowledge about how companies are implementing LP. The existing literature of LP in this country is rare and focused mainly on case studies with a few selected companies. For that, a survey with 49 firms of the automotive supply chain of Brazil was carried out and data collected was analyzed by means of multivariate techniques.

  7. [Results of the implementation of the Bacteremia Zero project in Catalonia, Spain].

    Science.gov (United States)

    Alvarez-Lerma, Francisco; Oliva, Glòria; Ferrer, Joan M; Riera, Alba; Palomar, Mercedes

    2014-07-01

    The nationwide Bacteremia Zero (BZ) Project consists in the simultaneous implementation of measures to prevent central venous catheter-related bacteremia (CVC-B) in critically ill patients and in the development of an integral safety plan. The objective is to present the results obtained after the implementation of the BZ project in the ICUs of the Autonomous Community of Catalonia, Spain. All patients admitted to ICUs in Catalonia participating in the ENVIN-HELICS registry between January 2009 and June 2010 were included. Information was provided by 36 (92.3%) of the total possible 39 ICUs. A total of 281 episodes of CVC-B were diagnosed (overall rate of 2.53 episodes per 1000 days of CVC). The rates have varied significantly between ICUs that participated in the project for more or less than 12 months (2.17 vs. 4.27 episodes per 1000 days of CVC, respectively; p<.0001). The implementation of the BZ Project in Catalonia has been associated with a decrease greater than 40% in the CVC-B rates in the ICUs of this community, which is much higher than the initial objective of 4 episodes per 1000 days of CVC). Copyright © 2014. Published by Elsevier Espana.

  8. Potential implementation of light steel housing system for affordable housing project in Malaysia

    Science.gov (United States)

    Saikah, M.; Kasim, N.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. A.

    2017-11-01

    An unparalleled number between housing demand and housing supply in Malaysia has increased the housing prices, which gives consequences to the homeownership issue. One way to reduce the housing price is by faster increase the number of affordable housing, but the construction sector faces difficulties in delivering as expected number by using conventional and current industrialised building system (IBS) due to the issue related high project cost, time and labour. Therefore, light steel housing (LSH) system as one of another type of IBS method can be utilised in housing construction project. This method can replace the conventional method that was currently used in the construction of affordable housing project. The objectives of this study are to identify the potential of LSH and influencing factors of system implementation. This is an initial stage to review the previous study related to LSH implementation in developed and developing countries. The previous study will be analysed regarding advantages and disadvantages of LSH and factors that influence the implementation of the system. Based on the literature review it is expected to define the potential and influencing factors of the LSH system. The findings are meaningful in framing and enhance construction housing method of an affordable housing project in Malaysia.

  9. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  10. IMPROVING THE PROVISION OF STATE GUARANTEES UNDER CREDITS OR BONDED LOANS RAISED FOR INVESTMENT PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Lola D. Sanginova

    2015-01-01

    Full Text Available Importance: Under current conditions, the Russian economy needs investment resources to ensure sustainable social and economic development. One of instruments of state-financing backing that can be used to support capital intensive, economically viable, financially and socially efficient investment projects that create "growing points" are state guarantees of theRussian Federation.Objective: The objective of this study is to identify possible ways to improve the requirements and procedures of providing state guarantees of theRussian Federationwhich contribute to the increase in the quantity and quality of investment projects of high social importance. Methods: Through the use of general scientific methods, analysis and synthesis, induction and deduction the possibility of creating a more attractive environment for principals is analyzed, measures to reduce the risk for public legal entities in providing state guarantees of theRussian Federationunder credits or bonded loans raised for investment projects implementation.Results: Principles of state guarantee support that ensure the interests of both the principals and the guarantor are defined. The basic directions for improving the mechanism how state guarantees of theRussian Federationsupport investment projects are justified. These directions include increasing availability of obtaining state guarantee support by lowering the cost of investment projects for which the state guarantees may be provided; reducing time of decision making on granting a state guarantee; increasing the creditors’ responsibility for a qualitative assessment of the creditworthiness of principals and investment projects; changing the methodology for assessing the social efficiency of investment projects; increasing the information transparency of provided state guarantees of the Russian Federation.Conclusions: The main result of this study is that under current conditions of economic turbulence state guarantees of the

  11. Implementation of targeted medication adherence interventions within a community chain pharmacy practice: The Pennsylvania Project.

    Science.gov (United States)

    Bacci, Jennifer L; McGrath, Stephanie Harriman; Pringle, Janice L; Maguire, Michelle A; McGivney, Melissa Somma

    2014-01-01

    To identify facilitators and barriers to implementing targeted medication adherence interventions in community chain pharmacies, and describe adaptations of the targeted intervention and organizational structure within each individual pharmacy practice. Qualitative study. Central and western Pennsylvania from February to April 2012. Rite Aid pharmacists staffed at the 118 Pennsylvania Project intervention sites. Qualitative analysis of pharmacists' perceptions of facilitators and barriers experienced, targeted intervention and organizational structure adaptations implemented, and training and preparation prior to implementation. A total of 15 key informant interviews were conducted from February to April 2012. Ten pharmacists from "early adopter" practices and five pharmacists from "traditionalist" practices were interviewed. Five themes emerged regarding the implementation of targeted interventions, including all pharmacists' need to understand the relationship of patient care programs to their corporation's vision; providing individualized, continual support and mentoring to pharmacists; anticipating barriers before implementation of patient care programs; encouraging active patient engagement; and establishing best practices regarding implementation of patient care services. This qualitative analysis revealed that there are a series of key steps that can be taken before the execution of targeted interventions that may promote successful implementation of medication therapy management in community chain pharmacies.

  12. Assessment of Non-Financial Criteria in the Selection of Investment Projects for Seed Capital Funding: the Contribution of Scientometrics and Patentometrics

    Directory of Open Access Journals (Sweden)

    Gustavo da Silva Motta

    2012-09-01

    Full Text Available The aim of this article is to assess the potential of using scientometric and patentometric indicators as a way of instrumentalizing the selection process of projects for seed capital funding. There is an increasing interest in technology based enterprises for their capacity to contribute to economic and social development, but there is also some difficulty in assessing non-financial criteria associated with technology for the purposes of financial funding. Thus, this research selected the case of the first enterprise invested in by the largest seed capital fund in Brazil, in order to create scientific and technological indicators and to assess the extent to which these indicators may contribute to understanding the market potential of the technology once it is assessed. It was concluded that scientometric and patentometric indicators favour the assessment process for non-financial criteria, in particular those criteria dealt with in this study: technology, market, divestment, and team.

  13. PROSPECTS OF CCS PROJECTS IMPLEMENTATION IN RUSSIA: ENVIRONMENTAL PROTECTION AND ECONOMIC OPPORTUNITIES

    Directory of Open Access Journals (Sweden)

    Pavel Tcvetkov

    2016-04-01

    Full Text Available The urgency of environmental protection is determined by its intensive change because of human impact, which, among other things, accompanied by an increasing of carbon dioxide (CO2 emissions. One of the ways to reduce the emission is Carbon Capture and Storage (CCS technologies. To date, developed countries have successfully implemented a number of CCS demonstration projects. Their main purpose is to study the effectiveness of CO2 storage. Russia is one of the world’s largest producers of CO2 emissions. However, CO2 capture and storage issues are not studied by Russian enterprises due to the absence of environmental taxes. The experience of developed countries shows that CO2 storage projects, in addition to the reduction of anthropogenic impact, can be commercially effective not only by reducing the tax burden. This review presents the analysis of international experience in the field of CO2 capture and storage. Given the immaturity of technology and lack of the necessary volume of statistical data, it was an attempt to determine the minimum conditions, which permit the implementation of CCS projects in Russian oil fields. On the basis of the Russian development forecast and the fuel balance structure the volumes of CO2 emissions in the 2016–2030 years were calculated. According to significant difference in opinions about the feasibility of CCS implementation in Russia, this review presents the main arguments for and against such projects. Evaluation of the potential effectiveness of CCS projects to enhance oil recovery factor showed that in spite of the absence of CO2 emissions taxes, such projects could be commercially effective in Russia due to the increase in oil recovery.

  14. Implementation of visitor pattern in processing a syntax tree in Qlab project

    Directory of Open Access Journals (Sweden)

    Đenić Aleksandar

    2012-01-01

    Full Text Available Qlab is an open-source project that supports various mathematical calculations, specialized for academic use. It has been developed at the Faculty of Mathematics, University of Belgrade, and is supported by Microsoft Serbia. In this paper we present some of Qlab’s successfully implemented core solutions. More precisely, in our approach we use a specialized Visitor pattern to optimize the management of syntax tree commands that our parser sends to our engine. This allows the processing of a larger scale of tree implementation using the Visitor interface.

  15. NEN Division Funding Gap Analysis

    International Nuclear Information System (INIS)

    Esch, Ernst I.; Goettee, Jeffrey D.; Desimone, David J.; Lakis, Rollin E.; Miko, David K.

    2012-01-01

    The work in NEN Division revolves around proliferation detection. The sponsor funding model seems to have shifted over the last decades. For the past three lustra, sponsors are mainly interested in funding ideas and detection systems that are already at a technical readiness level 6 (TRL 6 -- one step below an industrial prototype) or higher. Once this level is reached, the sponsoring agency is willing to fund the commercialization, implementation, and training for the systems (TRL 8, 9). These sponsors are looking for a fast turnaround (1-2 years) technology development efforts to implement technology. To support the critical national and international needs for nonprolifertion solutions, we have to maintain a fluent stream of subject matter expertise from the fundamental principals of radiation detection through prototype development all the way to the implementation and training of others. NEN Division has large funding gaps in the Valley of Death region. In the current competitive climate for nuclear nonproliferation projects, it is imminent to increase our lead in this field.

  16. Tensions related to implementation of postgraduate degree projects in specialist nursing education.

    Science.gov (United States)

    German Millberg, Lena; Berg, Linda; Lindström, Irma; Petzäll, Kerstin; Öhlén, Joakim

    2011-04-01

    In conjunction with the introduction of the Bologna process in Sweden, specialist nursing education programmes were moved up to the second cycle of higher education with the opportunity to take a one-year master's degree, which also meant that students would undertake a degree project carrying 15 ECTS. The purpose of this study was to examine the introduction of postgraduate degree projects on the second-cycle level into Swedish specialist nursing programmes in accordance with the Bologna process. Five universities were involved and the study design took the form of action research. Problem formulation, planning, evaluation and follow-up with reflection led to new actions over a period of 2 1/2 years. Through a review of local curriculum documents, the implementation of a postgraduate degree project was monitored and these reviews, together with field notes, were analysed by means of constant comparative analysis. The results revealed a variety of tensions that arose when postgraduate degree projects were introduced, taking the form of differing views on the relationship between research, clinical development, specific professional objectives and academic objectives. These tensions were reflected in six areas of change. In summary, it can be noted that implementation of the postgraduate degree projects highlighted tensions related to basic views of learning. Copyright © 2010 Elsevier Ltd. All rights reserved.

  17. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  18. Implementation of quality management in early stages of research and development projects at a university.

    Science.gov (United States)

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  19. Effort estimation for enterprise resource planning implementation projects using social choice - a comparative study

    Science.gov (United States)

    Koch, Stefan; Mitlöhner, Johann

    2010-08-01

    ERP implementation projects have received enormous attention in the last years, due to their importance for organisations, as well as the costs and risks involved. The estimation of effort and costs associated with new projects therefore is an important topic. Unfortunately, there is still a lack of models that can cope with the special characteristics of these projects. As the main focus lies in adapting and customising a complex system, and even changing the organisation, traditional models like COCOMO can not easily be applied. In this article, we will apply effort estimation based on social choice in this context. Social choice deals with aggregating the preferences of a number of voters into a collective preference, and we will apply this idea by substituting the voters by project attributes. Therefore, instead of supplying numeric values for various project attributes, a new project only needs to be placed into rankings per attribute, necessitating only ordinal values, and the resulting aggregate ranking can be used to derive an estimation. We will describe the estimation process using a data set of 39 projects, and compare the results to other approaches proposed in the literature.

  20. Lessons Learnt in the Development of Level 1 PUSPATI TRIGA Reactor Probability Safety Assessment: A Collaboration Project under the Norwegian Extra Budgetary Fund

    International Nuclear Information System (INIS)

    Mazleha Maskin; Tom, P.P.; Ahmad Hassan Sallehudin Mohd Sarif; Faizal Mohamed; Mohd Fazli Zakaria; Muhamad Puad Abu

    2014-01-01

    This article reports about the lessons learnt from the development of level 1 probabilistic safety assessment (PSA) project that was implemented under the IAEA mentoring program for TRIGA MARK II PUSPATI research reactor (RTP). As a project that involved more than 3 organizations, a strategic planning of the management and implementation of individual assignment is truly a hectic task. This report compiles all related activities from the forming of the Malaysian PSA team up to the final report submitted to the IAEA. (author)