WorldWideScience

Sample records for project impact implementing

  1. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  2. Impact of project funding on the implementation of LEEMP ...

    African Journals Online (AJOL)

    The implementation process could make a project succeed, fail or even abandoned midstream. Information gathered from LEEMP in Imo State indicates that out of the 258 development projects embarked upon by LEEMP, only 24.4% have been completed while 75.6% are at their various completion stages after committing ...

  3. 197 impact of project funding on the implementation of leemp

    African Journals Online (AJOL)

    2007-10-31

    Oct 31, 2007 ... the positive growth of the social welfare and functions of the populace. ... In the light of the above, this study has the objective of examining the effectiveness of the funds budgeted for LEEMP projects since inception by the ...

  4. IMPACT OF GRANT PROJECTS IMPLEMENTATION IN ROMANIAN HIGHER EDUCATION INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Vlad S. PETCU

    2016-07-01

    Full Text Available Romanian Higher Education Institutions were one of the main beneficiaries of European funding in the 2007-2013 funding excercise, especially in the Sectoral Operational Programme Human Resources Development. Analyzing the data provided by 21 public universities in Romania, we find that Universities have accessed in a significant proportion two types of projects: those dedicated to transition from school to active life and those dedicated to doctoral studies. Also, the proportion of the European funds attracted by HEIs is an overwhelming part of the allocation of reference (over 40% since 2011, and also a significant proportion of total revenues universities (~15.5 % for 2011-2014.

  5. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  6. Implementing parallel spreadsheet models for health policy decisions: The impact of unintentional errors on model projections.

    Science.gov (United States)

    Bailey, Stephanie L; Bono, Rose S; Nash, Denis; Kimmel, April D

    2018-01-01

    Spreadsheet software is increasingly used to implement systems science models informing health policy decisions, both in academia and in practice where technical capacity may be limited. However, spreadsheet models are prone to unintentional errors that may not always be identified using standard error-checking techniques. Our objective was to illustrate, through a methodologic case study analysis, the impact of unintentional errors on model projections by implementing parallel model versions. We leveraged a real-world need to revise an existing spreadsheet model designed to inform HIV policy. We developed three parallel versions of a previously validated spreadsheet-based model; versions differed by the spreadsheet cell-referencing approach (named single cells; column/row references; named matrices). For each version, we implemented three model revisions (re-entry into care; guideline-concordant treatment initiation; immediate treatment initiation). After standard error-checking, we identified unintentional errors by comparing model output across the three versions. Concordant model output across all versions was considered error-free. We calculated the impact of unintentional errors as the percentage difference in model projections between model versions with and without unintentional errors, using +/-5% difference to define a material error. We identified 58 original and 4,331 propagated unintentional errors across all model versions and revisions. Over 40% (24/58) of original unintentional errors occurred in the column/row reference model version; most (23/24) were due to incorrect cell references. Overall, >20% of model spreadsheet cells had material unintentional errors. When examining error impact along the HIV care continuum, the percentage difference between versions with and without unintentional errors ranged from +3% to +16% (named single cells), +26% to +76% (column/row reference), and 0% (named matrices). Standard error-checking techniques may not

  7. Variables that impact the implementation of project-based learning in high school science

    Science.gov (United States)

    Cunningham, Kellie

    Wagner and colleagues (2006) state the mediocrity of teaching and instructional leadership is the central problem that must be addressed if we are to improve student achievement. Educational reform efforts have been initiated to improve student performance and to hold teachers and school leaders accountable for student achievement (Wagner et al., 2006). Specifically, in the area of science, goals for improving student learning have led reformers to establish standards for what students should know and be able to do, as well as what instructional methods should be used. Key concepts and principles have been identified for student learning. Additionally, reformers recommend student-centered, inquiry-based practices that promote a deep understanding of how science is embedded in the everyday world. These new approaches to science education emphasize inquiry as an essential element for student learning (Schneider, Krajcik, Marx, & Soloway, 2002). Project-based learning (PBL) is an inquiry-based instructional approach that addresses these recommendations for science education reform. The objective of this research was to study the implementation of project-based learning (PBL) in an urban school undergoing reform efforts and identify the variables that positively or negatively impacted the PBL implementation process and its outcomes. This study responded to the need to change how science is taught by focusing on the implementation of project-based learning as an instructional approach to improve student achievement in science and identify the role of both school leaders and teachers in the creation of a school environment that supports project-based learning. A case study design using a mixed-method approach was used in this study. Data were collected through individual interviews with the school principal, science instructional coach, and PBL facilitator. A survey, classroom observations and interviews involving three high school science teachers teaching grades 9

  8. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  9. Development of a Blueprint Impact System of the risks on construction projects Implementation

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2015-08-01

    Full Text Available In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization. The research aims to develop a blue print to analyze the relationship between the impact of risk and stages of implementing of the project and, the effect of risk relationship with the type of contract, and the impact of risks to do with the type of construction works. In this paper a number of risks has been identified that have already occurred from the study of a number of construction projects completed and theoretical studies and interview a number of construction industry experts to determine the extent of the impact of these risks in each of these three axes in construction projects in Iraq for the purpose of responding and management. The study found a set of conclusions such as existing of priority in happiness of risks which proof that there is an relationship between the risks and sort of stage, contract and constructional work. In the light of what has been reached for the purpose of benefiting from the computer automated features a program have been used ( Vanguard Software System to build the decision tree in order to manage the risks according to their priority in happiness.

  10. The Impact of an Implementation Project on Primary Care Staff Perceptions of Delivering Brief Alcohol Advice

    Directory of Open Access Journals (Sweden)

    Hanna Reinholdz

    2016-01-01

    Full Text Available Objective. To explore how the perceptions and experiences of working with risky drinkers change over time among primary health care staff during a systematic implementation project. Methods. Qualitative focus group interviews took place before and after the implementation of the project. Results. The staff displayed a positive change during the implementation period with regard to awareness, knowledge, and confidence that led to a change in routine practice. Throughout the project, staff were committed to engaging with risky drinkers and appeared to have been learning-by-doing. Conclusions. The results indicated a positive attitude to alcohol prevention work but staff lack knowledge and confidence in the area. The more practical experience during the study is, the more confidence seems to have been gained. This adds new knowledge to the science of implementation studies concerning alcohol prevention measures, which have otherwise shown disappointing results, emphasizing the importance of learning in practice.

  11. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  12. Impacts of the Implementation of a Project Management Information System – a Case Study of a Small R

    Directory of Open Access Journals (Sweden)

    Borštnar Mirjana Kljajić

    2014-02-01

    Full Text Available Background: The problems of resources management (human, financial, time in multi-project companies are inherently complex and need to be addressed systematically, in both small and large organizations. Furthermore, there is a need for transparent communication and collaboration within the organization as well as with partnering organizations. There are many methodologies and tools supporting project management, which are themselves complex and are therefore not widely adopted, especially among small companies. Objectives: The aim of this paper is to analyse impact of the implementation of a flexible cloud-based project management information system (PMIS from the human resources, financial management, and collaboration points of view. Method: We have conducted a case study in a small Slovenian research and development company, that has implemented the 4PM PMIS. Results: The findings imply the importance of keeping the balance of the creative processes that are unstructured, rule free and even chaotic, with structured processes monitor and control. Conclusions: The results of the study suggest that the use of “4PM” in support of multi-project management improves human resources and financial management in a collaborative and transparent way when implemented in an open and highly motivated environment

  13. Impact of a national specialty e-consultation implementation project on access.

    Science.gov (United States)

    Kirsh, Susan; Carey, Evan; Aron, Dacid C; Cardenas, Omar; Graham, Glenn; Jain, Rajiv; Au, David H; Tseng, Chin-Lin; Franklin, Heather; Ho, P Michael

    2015-12-01

    To assess the early impact of implementation of the electronic consults (e-consults) initiative by the Veterans Health Administration (VHA), designed to improve specialty care access. Observational cohort study exploiting a natural experiment begun in May 2011 at 12 VHA medical centers and expanded to 122 medical centers by December 2013. The following were assessed: 1) growth of e-consults by VHA regional networks, medical centers, and specialty; 2) location of patient's primary care provider (medical center vs community-based outpatient clinic [CBOC]); 3) potential patient miles needed to travel for a specialty care face-to-face consult in place of the observed e-consults using estimated geodesic distance; 4) use of specialty care subsequent to the e-consult. Of 11,270,638 consults completed in 13 clinics of interest, 217,014 were e-consults (adjusted rate, 1.93 e-consults per 100 consults). The e-consult rate was highest in endocrinology (5.0 per 100), hematology (3.0 per 100), and gastroenterology (3.0 per 100). The percentage of e-consult patients with CBOC-based primary care grew from 28.5% to 44.4% in the first year of implementation and to 45.6% at year 3. Of those e-consult patients from community clinics, the average potential miles needed to travel was 72.1 miles per patient (SD = 72.6; median = 54.6; interquartile range = 17.1-108), translating to a potential savings of 6,875,631 total miles and travel reimbursement costs of $2,853,387. E-consult volume increased significantly since inception within many medical and surgical specialties. For patients receiving primary care at one of more than 800 CBOCs, e-consults may decrease travel burden and direct travel costs for patients.

  14. The Impact of Implementing an Educational Project, the Solar Village, on Pupils, Teachers, and Parents

    Science.gov (United States)

    Hugerat, Muhamad; Ilaiyan, Salman; Zadik, Rena; Zidani, Saleem; Zidan, Raid; Toren, Zehava

    2004-01-01

    In this project, we suggest building a real model of solar village inside schools, which use only solar energy. Such projects emphasize the importance of energy for a technological society and the advantage of alternative energy sources. In this study, we report on pupils in the 6th grade in three elementary schools in Israel who were active…

  15. PROJECT IMPLEMENTATION IN ORGANISATIONS OF REPETITIVE ACTIVITIES

    Directory of Open Access Journals (Sweden)

    Marek WIRKUS

    2015-04-01

    Full Text Available The study presents the implementation of projects in organisations that achieve business objectives through the imple-mentation of repetitive actions. Projects in these organisations are, on the one hand, treated as marginal activities, while the results of these projects have significant impact on the delivery of main processes, e.g. through the introduction of new products. Human capital and solutions in this field bear impact on the success of projects in these organisations, which is not always conducive to smooth implementation of projects. Conflict results from the nature of a project, which is a one-time and temporary process, so organisational solutions are also temporary. It influences on attitudes and com-mitment of the project contractors. The paper identifies and analyses factors which affect the success of the projects.

  16. Perspectives of joint implementation projects in Lithuania

    OpenAIRE

    Štreimikienė, Dalia; Mikalauskienė, Asta

    2004-01-01

    The paper deals with the perspectives of joint implementation (JI) projects in Lithuania. The analysis of flexible mechanisms under the Kyoto protocol including Jl benefits is presented in the paper. The main aim of the article is to analyze current macroeconomic environment which has impact on the JI perspectives in Lithuania and based on this analysis to define activities, measures and institutions necessary for the implementation of these projects. A very important issue in this context is...

  17. Impact of the implementation of an online network support tool among clinicians of primary health care and specialists: ECOPIH Project.

    Science.gov (United States)

    Lacasta Tintorer, David; Flayeh Beneyto, Souhel; Alzaga Reig, Xavier; Mundet Tuduri, Xavier; De la Fuente, Josep Anton; Manresa, Josep Maria; Torán Monserrat, Pere; Saigí Rubió, Francesc

    2013-10-03

    There has been created an online communication tool with the objective to improve the communication among different levels of care, between Primary Care clinicians and Specialists. This tool is web 2.0 based technology (ECOPIH project). It allows to review clinical cases and to share knowledge. Our study will evaluate its impact in terms of reduction on the number of referrals to three specialties two years after the use of this tool. Open, multicenter, controlled, non random intervention study over 24 months. Study population includes 131 Primary Care Physicians assigned to nine health centers. The study will compare the clinicians that use the ECOPIH with the ones that do not use the tool. Also, professionals that start to use the tool during the period time of the study will be included.The number of annual referrals during the first and second year will be analyzed and retrospectively compared with the previous year to the implementation of the tool. Moreover, it will be assessed the level of satisfaction of the professionals with the tool and to what extend the tool responds to their needs. The implementation of ECOPIH in the field of Primary Health Care can decrease the number of referrals from primary care to specialist care.It is expected that the reduction will be more noticeable in the group of professionals that use more intensively the tool. Furthermore, we believe that it can be also observed with the professionals that read the contributions of the others.We anticipate high degree of customer satisfaction as it is a very helpful resource never used before in our environment.

  18. FAA Loran early implementation project

    Science.gov (United States)

    1990-03-01

    The Early Implementation Project (EIP), established by FAA Administrator Admiral : Donald C. Engen, was the initial step in the process of Loran integration into the : National Airsace System (NAS). The EIP was designed to give the FAA and the Loran ...

  19. Overview of the OGAP Formative Assessment Project and CPRE's Large-Scale Experimental Study of Implementation and Impacts

    Science.gov (United States)

    Supovitz, Jonathan

    2016-01-01

    In this presentation discussed in this brief abstracted report, the author presents about an ongoing partnership with the Philadelphia School District (PSD) to implement and research the Ongoing Assessment Project (OGAP). OGAP is a systematic, intentional and iterative formative assessment system grounded in the research on how students learn…

  20. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  1. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  2. Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: a case study using simulation modelling

    Science.gov (United States)

    Fryling, Meg

    2010-11-01

    Organisations often make implementation decisions with little consideration for the maintenance phase of an enterprise resource planning (ERP) system, resulting in significant recurring maintenance costs. Poor cost estimations are likely related to the lack of an appropriate framework for enterprise-wide pre-packaged software maintenance, which requires an ongoing relationship with the software vendor (Markus, M.L., Tanis, C., and Fenema, P.C., 2000. Multisite ERP implementation. CACM, 43 (4), 42-46). The end result is that critical project decisions are made with little empirical data, resulting in substantial long-term cost impacts. The product of this research is a formal dynamic simulation model that enables theory testing, scenario exploration and policy analysis. The simulation model ERPMAINT1 was developed by combining and extending existing frameworks in several research domains, and by incorporating quantitative and qualitative case study data. The ERPMAINT1 model evaluates tradeoffs between different ERP project management decisions and their impact on post-implementation total cost of ownership (TCO). Through model simulations a variety of dynamic insights were revealed that could assist ERP project managers. Major findings from the simulation show that upfront investments in mentoring and system exposure translate to long-term cost savings. The findings also indicate that in addition to customisations, add-ons have a significant impact on TCO.

  3. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  4. Implementing clinical process management of vascular wounds in a tertiary facility: impact evaluation of a performance improvement project.

    Science.gov (United States)

    Avruscio, Giampiero; Tocco-Tussardi, Ilaria; Bordignon, Greta; Vindigni, Vincenzo

    2017-01-01

    Chronic vascular wounds have a significant economic and social impact on our society calling for allocation of a great deal of attention and resources. Efforts should be oriented toward the achievement of the most effective and efficient clinical management. The Angiology Unit at the University Hospital of Padova, Italy, developed a performance improvement project to enhance the quality of practice for vascular ulcers. The project consisted in a multistep process comprising a critical revision of the previous clinical process management, staff education, tightening connections between operators and services, and creation of a position for a wound care nurse. The previous standard of practice was modified according to the results of revision and the current evidence-based practice. The new standard of practice reached its full application in September 2015. The number of patients treated and the number of visits in 2015 remained almost unvaried from 2014. However, the total annual expenditure for treating vascular ulcers was reduced by ~60% from the previous year. Standardization of guidelines and practice is effective in creating an efficient clinical management and in reducing the economic burden of vascular ulcers.

  5. Implementing clinical process management of vascular wounds in a tertiary facility: impact evaluation of a performance improvement project

    Directory of Open Access Journals (Sweden)

    Avruscio G

    2017-10-01

    Full Text Available Giampiero Avruscio,1,* Ilaria Tocco-Tussardi,1,2,* Greta Bordignon,3 Vincenzo Vindigni2 1Angiology Unit, Department of Cardiac, Thoracic and Vascular Sciences, University Hospital of Padova, Padova, Italy; 2Clinic of Plastic and Reconstructive Surgery, Department of Neurosciences, University Hospital of Padova, Padova, Italy; 3Clinical Management, University Hospital of Padova, Padova, Italy *These authors contributed equally to this work Background: Chronic vascular wounds have a significant economic and social impact on our society calling for allocation of a great deal of attention and resources. Efforts should be oriented toward the achievement of the most effective and efficient clinical management. The Angiology Unit at the University Hospital of Padova, Italy, developed a performance improvement project to enhance the quality of practice for vascular ulcers.Methods: The project consisted in a multistep process comprising a critical revision of the previous clinical process management, staff education, tightening connections between operators and services, and creation of a position for a wound care nurse. The previous standard of practice was modified according to the results of revision and the current evidence-based practice.Results: The new standard of practice reached its full application in September 2015. The number of patients treated and the number of visits in 2015 remained almost unvaried from 2014. However, the total annual expenditure for treating vascular ulcers was reduced by ~60% from the previous year.Conclusion: Standardization of guidelines and practice is effective in creating an efficient clinical management and in reducing the economic burden of vascular ulcers. Keywords: chronic wounds, clinical process management, cost-effectiveness, vascular ulcers

  6. Reducing Nutrients and Nutrient Impacts Priority Issue Team - St. Louis Bay Project: Implementing Nutrients PIT Action Step 1.1

    Science.gov (United States)

    Mason, Ted

    2011-01-01

    The NASA Applied Science & Technology Project Office at Stennis Space Center(SSC) used satellites, in-situ measurements and computational modeling to study relationships between water quality in St. Louis Bay, Mississippi and the watershed characteristics of the Jourdan and Wolf rivers from 2000-2010.

  7. Implementing REDD+ (Reducing Emissions from Deforestation and Degradation): evidence on governance, evaluation and impacts from the REDD-ALERT project

    NARCIS (Netherlands)

    Matthews, R.B.; Noordwijk, van M.; Lambin, E.; Meyfroidt, P.; Gupta, J.; Verschot, L.; Hergoualc'h, K.; Veldkamp, E.

    2014-01-01

    Abstract The REDD-ALERT (Reducing Emissions from Deforestation and Degradation from Alternative Land Uses in the Rainforests of the Tropics) project started in 2009 and finished in 2012, and had the aim of evaluating mechanisms that translate international-level agreements into instruments that

  8. Implementing REDD+ (Reducing Emissions from Deforestation and Degradation): evidence on governance, evaluation and impacts from the REDD-ALERT project

    NARCIS (Netherlands)

    Mathews, R.B.; van Noordwijk, M.; Lambin, E.; Meyfroidt, P.; Gupta, J.; Verchot, L.; Hergoualc'h, K.; Veldkamp, E.

    2014-01-01

    The REDD-ALERT (Reducing Emissions from Deforestation and Degradation from Alternative Land Uses in the Rainforests of the Tropics) project started in 2009 and finished in 2012, and had the aim of evaluating mechanisms that translate international-level agreements into instruments that would help

  9. Implementing Livestock Anaerobic Digestion Projects

    Science.gov (United States)

    Page provides information to help make an informed decision about installing an anaerobic digester. Is it a good match for a farm’s organic waste, project financing, development guidelines and permit requirements?

  10. Classification of Implemented Foreign Assisted Projects into ...

    African Journals Online (AJOL)

    Classification of Implemented Foreign Assisted Projects into Sustainable And. Non-sustainable ... services or benefits is the most discriminating factor. Key Words: ..... Table 2: Relative discriminatory power of the variables equation (18).

  11. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  12. Implementation impacts of PRL methodology

    International Nuclear Information System (INIS)

    Caudill, J.A.; Krupa, J.F.; Meadors, R.E.; Odum, J.V.; Rodrigues, G.C.

    1993-02-01

    This report responds to a DOE-SR request to evaluate the impacts from implementation of the proposed Plutonium Recovery Limit (PRL) methodology. The PRL Methodology is based on cost minimization for decisions to discard or recover plutonium contained in scrap, residues, and other plutonium bearing materials. Implementation of the PRL methodology may result in decisions to declare as waste certain plutonium bearing materials originally considered to be a recoverable plutonium product. Such decisions may have regulatory impacts, because any material declared to be waste would immediately be subject to provisions of the Resource Conservation and Recovery Act (RCRA). The decision to discard these materials will have impacts on waste storage, treatment, and disposal facilities. Current plans for the de-inventory of plutonium processing facilities have identified certain materials as candidates for discard based upon the economic considerations associated with extending the operating schedules for recovery of the contained plutonium versus potential waste disposal costs. This report evaluates the impacts of discarding those materials as proposed by the F Area De-Inventory Plan and compares the De-Inventory Plan assessments with conclusions from application of the PRL. The impact analysis was performed for those materials proposed as potential candidates for discard by the De-Inventory Plan. The De-Inventory Plan identified 433 items, containing approximately 1% of the current SRS Pu-239 inventory, as not appropriate for recovery as the site moves to complete the mission of F-Canyon and FB-Line. The materials were entered into storage awaiting recovery as product under the Department's previous Economic Discard Limit (EDL) methodology which valued plutonium at its incremental cost of production in reactors. An application of Departmental PRLs to the subject 433 items revealed that approximately 40% of them would continue to be potentially recoverable as product plutonium

  13. Decoupling, re-Engaging: managing trust relationships in implementation projects

    DEFF Research Database (Denmark)

    Rose, Jeremy; Schlichter, Bjarne Rerup

    2012-01-01

    , and the complex demands of managing those fluctuations. We investigate evolving trust relationships in a longitudinal case analysis of a large Integrated Hospital System implementation for the Faroe Islands. Trust relationships suffered various breakdowns, but the project was able to recover and eventually meet...... its goals. Based on concepts from Giddens’ later work on modernity, we develop two approaches for managing dynamic trust relationships in implementation projects: decoupling and re-engaging.......An important aspect of the successful implementation of large information systems (such as ERP systems) is trust. These implementations impact the legitimate interests of many groups of stakeholders, and trust is a critical factor for success. Trust in the project is contingent upon many factors...

  14. 30 CFR 880.13 - Project implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project implementation. 880.13 Section 880.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... on Indian lands under the jurisdiction of tribes not having approved AML reclamation plans and on...

  15. Data collected on TPAD implementation projects.

    Science.gov (United States)

    2014-11-01

    TPAD testing was conducted by CTR personnel at the following locations during TxDOT Project : 5-6005-01: Statewide Implementation of Total Pavement Acceptance Device (TPAD) (January : 2013 through August 2014): : (1) San Marcos Airport, : (2) IH 10 i...

  16. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  17. Implementation of the model project: Ghanaian experience

    International Nuclear Information System (INIS)

    Schandorf, C.; Darko, E.O.; Yeboah, J.; Asiamah, S.D.

    2003-01-01

    Upgrading of the legal infrastructure has been the most time consuming and frustrating part of the implementation of the Model project due to the unstable system of governance and rule of law coupled with the low priority given to legislation on technical areas such as safe applications of Nuclear Science and Technology in medicine, industry, research and teaching. Dwindling Governmental financial support militated against physical and human resource infrastructure development and operational effectiveness. The trend over the last five years has been to strengthen the revenue generation base of the Radiation Protection Institute through good management practices to ensure a cost effective use of the limited available resources for a self-reliant and sustainable radiation and waste safety programme. The Ghanaian experience regarding the positive and negative aspects of the implementation of the Model Project is highlighted. (author)

  18. Development and implementation of the Qatargas project

    International Nuclear Information System (INIS)

    Abdulrahman, A.

    1997-01-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs

  19. Development and implementation of the Qatargas project

    Energy Technology Data Exchange (ETDEWEB)

    Abdulrahman, A [Qatar Liquefied Gas Company Ltd., Doha (Qatar)

    1997-06-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs.

  20. PERFORMANCE ANALYSIS OF PROJECTS IMPLEMENTATION IN HEIS

    Directory of Open Access Journals (Sweden)

    Sergiu-Vlad PETCU

    2015-04-01

    Full Text Available According to the European Commission, Romania is still facing significant mismatch between the skills of graduates of tertiary education and the market needs. This paper is highly relevant for the future implementation of HEIs, since they have a strong economic role and they can significantly influence long-term national social and economical development. Romania did not manage to materialize community funds allocated for the 2007-2013 programming period to its full potential. Accordingly, the proposed thesis intends to analyse how Romanian HEIs were able to manage community resources attracted by grants and how the implemented projects achieved their set objectives. According to the data collected so far, the results will show that the performance of the projects is directly dependent on the proportion of fully dedicated staff in organizational design of the project. The originality of the undertaken study is that it starts from a realistic approach, according to which the rules of the game should be adapted, depending on the players (in our case – HEIs.

  1. Social impact assessment in energy projects

    International Nuclear Information System (INIS)

    Koivujaervi, S.; Kantola, I.; Maekinen, P.

    1998-01-01

    , interviews and earlier experience, a suggestion has been given for the implementation of the SIA for future energy projects. Several methods should be used in the assessment of the social impact, and the methods should be chosen case by case according to the specific features of each project. Good information is a prerequisite for the interaction between citizens and the operator, which is essential for the assessment of social impact. Citizens should be activated to participate and efforts should be made to use the received feedback information. (orig.) 83 refs

  2. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  3. The Impact of Student-Directed Projects in Introductory Statistics

    Science.gov (United States)

    Spence, Dianna J.; Bailey, Brad; Sharp, Julia L.

    2017-01-01

    A multi-year study investigated the impact of incorporating student-directed discovery projects into introductory statistics courses. Pilot instructors at institutions across the United States taught statistics implementing student-directed projects with the help of a common set of instructional materials designed to facilitate such projects.…

  4. The Optimizing Patient Transfers, Impacting Medical Quality, andImproving Symptoms:Transforming Institutional Care approach: preliminary data from the implementation of a Centers for Medicare and Medicaid Services nursing facility demonstration project.

    Science.gov (United States)

    Unroe, Kathleen T; Nazir, Arif; Holtz, Laura R; Maurer, Helen; Miller, Ellen; Hickman, Susan E; La Mantia, Michael A; Bennett, Merih; Arling, Greg; Sachs, Greg A

    2015-01-01

    The Optimizing Patient Transfers, Impacting Medical Quality, and Improving Symptoms: Transforming Institutional Care (OPTIMISTIC) project aims to reduce avoidable hospitalizations of long-stay residents enrolled in 19 central Indiana nursing facilities. This clinical demonstration project, funded by the Centers for Medicare and Medicaid Services Innovations Center, places a registered nurse in each nursing facility to implement an evidence-based quality improvement program with clinical support from nurse practitioners. A description of the model is presented, and early implementation experiences during the first year of the project are reported. Important elements include better medical care through implementation of Interventions to Reduce Acute Care Transfers tools and chronic care management, enhanced transitional care, and better palliative care with a focus on systematic advance care planning. There were 4,035 long-stay residents in 19 facilities enrolled in OPTIMISTIC between February 2013 and January 2014. Root-cause analyses were performed for all 910 acute transfers of these long stay residents. Of these transfers, the project RN evaluated 29% as avoidable (57% were not avoidable and 15% were missing), and opportunities for quality improvement were identified in 54% of transfers. Lessons learned in early implementation included defining new clinical roles, integrating into nursing facility culture, managing competing facility priorities, communicating with multiple stakeholders, and developing a system for collecting and managing data. The success of the overall initiative will be measured primarily according to reduction in avoidable hospitalizations of long-stay nursing facility residents. © 2014, Copyright the Authors Journal compilation © 2014, The American Geriatrics Society.

  5. Opportunities for AFRA NC implementing Projects

    International Nuclear Information System (INIS)

    2017-01-01

    Some of the AFRA Objectives are to Establish common understanding that all networks operate under the AFRA framework as an African single intergovernmental body Align these networks with the common objectives of AFRA for strengthening activities and to define the modalities for collaboration within AFRA MSs. Some of the achievements in 2016 are: Under RAF/0/038 “Promoting Technical Cooperation among Developing Countries (TCDC) in Africa through Triangular Partnerships”, adequate support was provided to facilitate the implementation of several joint project proposals submitted by Member States in various fields of activity including NDT, Radiation processing, and Education and Training in nuclear science and technology. Under RAF0041: “Sharing Best Practices in Preventive Maintenance of Nuclear Equipment”, support was provided to Member States at the Seibersdorf Laboratory to improve the maintenance of medical and scientific instrumentation through capacity development for repair services, preventive maintenance, and cost recovery through income generated from the provision of services

  6. Leadership in Real Time : A Model of Attributes Needed by a Project Manager in ERP Implementations

    OpenAIRE

    Gunson, John; De Blasis, Jean-Paul; Neary, Mary

    2003-01-01

    The characteristics and organizational impacts of an Enterprise Resource Planning (ERP) Implementation Project requires highly professional Project Manager skills and attributes. Some may be learned or bought but the more important skills need to be part of the Project Manager's personal makeup. Coaching, mentoring and leadership skills (and beyond) help the Project Manager to take right decisions as even unknown-unknown situations arise during the implementation. This paper contributes to id...

  7. Analysis of renewable energy projects' implementation in Russia

    Science.gov (United States)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  8. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  9. Sizing ERP implementation projects: an activity-based approach

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.

    2008-01-01

    ERP implementation projects affect large parts of an implementing organization and lead to changes in the way an organization performs its tasks. The costs needed for the effort to implement these systems are hard to estimate. Research indicates that the size of an ERP project can be a useful

  10. How internal audit can contribute to the success of ERP implementation projects in an Irish context.

    OpenAIRE

    Bennett, John Michael Anthony

    2014-01-01

    non-peer-reviewed The aim of this study is to explore how Internal Audit can contribute towards the successful implementation of ERP (Enterprise Resource Planning) projects in an Irish context. ERP projects are well documented for high failure rates and adverse impact on receiving businesses. Although there is limited literature available concerning the role of Internal Audit within ERP implementations, there is plenty available relating to ERP implementations which document risks, problem...

  11. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  12. Implementing Large Projects in Software Engineering Courses

    Science.gov (United States)

    Coppit, David

    2006-01-01

    In software engineering education, large projects are widely recognized as a useful way of exposing students to the real-world difficulties of team software development. But large projects are difficult to put into practice. First, educators rarely have additional time to manage software projects. Second, classrooms have inherent limitations that…

  13. Efficient and effective implementation of alternative project delivery methods.

    Science.gov (United States)

    2017-05-01

    Over the past decade, the Maryland Department of Transportation State Highway : Administration (MDOT SHA) has implemented Alternative Project Delivery (APD) methods : in a number of transportation projects. While these innovative practices have produ...

  14. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  15. Socio-economic Impact of Sethusamudram Project

    OpenAIRE

    Kannan, Srinivasan

    2007-01-01

    Any major development project has both benefits and disadvantages to the society. Many development projects have very high economic benefit and at the same time lead to environmental hazard. One such project is Sethudamudram project initiated by Government of India. This is a project which aims at minimising the distance of navigation for the goods transport in the sea. This paper is an attempt to study the socio-economic impact of the project based on the secondary data.

  16. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  17. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  18. Implementing Distance Education: Issues Impacting Administration

    Science.gov (United States)

    Schauer, Jolene; Rockwell, S. Kay; Fritz, Susan M.; Marx, Dave B.

    2005-01-01

    Through a modified Delphi study, an expert panel identified 62 concepts organized in eight issue categories that impact administrative decisions as higher education institutions commit to implementing distance education courses and programs. Using a mail survey, 62 department chairs in Colleges of Agriculture in Land-Grant Universities ranked the…

  19. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  20. Decommissioning Project Manager's Implementing Instructions (PMII)

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    Decommissioning Project personnel are responsible for complying with these PMII. If at any time in the performance of their duties a conflict between these instructions and other written or verbal direction is recognized or perceived, the supervisor or worker shall place his/her work place in a safe condition, stop work, and seek resolution of the conflict from the Decommissioning Project Manager or his designee

  1. Important projects are being implemented jointly

    International Nuclear Information System (INIS)

    Medeliene, D.

    1998-01-01

    Full text: Sweden is continuing its support to Lithuania in the field of nuclear safety. The major current projects include the testing of gap between graphite and pressure tube measuring device, the pressure tube investigation of material properties, content of hydrogen, microstructure, etc., ALS Structure verification using non-destructive testing, Conceptual study on Leak Before Break, Management seminars for VATESI, Multimedia System for the Ignalina NPP's Information Center and Waste management projects. Some of the projects are partially financed by Ignalina NPP. Sweden and Norway provide financing for the extremely important and expensive project - Physical protection: perimeter around the plant. Two new EC projects, Continuation of support to VATESI: licensing, inservice and decommissioning, and Phare TSO project to help building up TSO competence in Lithuania are no less important. In the beginning of September a functional exercise was organised with the Ignalina NPP emergency preparedness Information unit. This exercise was the second one of the two to prepare the personnel for the problems they have to solve in communication with public and media in the case of an accident at the Ignalina NPP

  2. Jerneh gas project challenges and implementation performance

    International Nuclear Information System (INIS)

    Perreau, M.E.

    1993-01-01

    The Jerneh gas project is part of Peninsular Malaysia's Gas Utilization Project, a mammoth undertaking to provide gas from the offshore fields off Malaysia's East Coast, to power stations and other industrial users throughout Peninsular Malaysia and Singapore. Prior to 1992, the only customers of the offshore Peninsular Malaysia gas were a local power station, and a steel mill in Terengganu, linked to the Phase 1 pipeline system. The Bekok platform is Esso Production Malaysia Inc. (EPMI)'s gas collection platform for existing associated gas fields. The Duyong and Sotong platforms are gas production/compression platforms operated by PETRONAS. In late 1991, the onshore pipeline system was extended by PETRONAS to cover the west and south coasts of Peninsular Malaysia and Singapore depicted in the map as the Phase 2 system. With the completion of the Jerneh platform and offshore trunklines, Jerneh became the primary source of supply to an increased number of customers in the wider Phase 2 gas network. Jerneh is estimated to have three TCF of non-associated gas. Phase 1 customers were utilizing about 120 MSCFD and the demand is expected to initially step-up to 400 MSCFD in 1992 and progressively increase thereafter. This paper provides an overview of the US$400 M Jerneh project for which detailed design commenced in 1989 and was commissioned in 1992. The paper describes the technical challenges, project execution, safety record and actions to achieve the fast track schedule for this project

  3. 5 CFR 470.313 - Project implementation regulations.

    Science.gov (United States)

    2010-01-01

    ... project must be approved by OPM and shall have full force and authority pursuant to Title VI of the Civil... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project implementation regulations. 470... PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  4. Development and implementation of a residency project advisory board.

    Science.gov (United States)

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  5. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  6. 44 CFR 80.17 - Project implementation.

    Science.gov (United States)

    2010-10-01

    ... property, the method of valuation and basis for the purchase offer, and the final offer amount. The offer... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND.... The subgrantee shall take steps to ensure it does not acquire or include in the project properties...

  7. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  8. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  9. Spent Nuclear Fuel (SNF) Project Safety Basis Implementation Strategy

    International Nuclear Information System (INIS)

    TRAWINSKI, B.J.

    2000-01-01

    The objective of the Safety Basis Implementation is to ensure that implementation of activities is accomplished in order to support readiness to move spent fuel from K West Basin. Activities may be performed directly by the Safety Basis Implementation Team or they may be performed by other organizations and tracked by the Team. This strategy will focus on five key elements, (1) Administration of Safety Basis Implementation (general items), (2) Implementing documents, (3) Implementing equipment (including verification of operability), (4) Training, (5) SNF Project Technical Requirements (STRS) database system

  10. Implementing Climate Services in Peru: CLIMANDES Project

    Science.gov (United States)

    Lavado-Casimiro, Waldo; Mauchle, Fabian; Diaz, Amelia; Seiz, Gabriela; Rubli, Alex; Rossa, Andrea; Rosas, Gabriela; Ita, Niceforo; Calle, Victoria; Villegas, Esequiel; Ambrosetti, Paolo; Brönnimann, Stefan; Hunziker, Stefan; Jacques, Martin; Croci-Maspoli, Mischa; Konzelmann, Thomas; Gubler, Stefanie; Rohrer, Mario

    2014-05-01

    The climate variability and change will have increasing influence on the economic and social development of all countries and regions, such as the Andes in Latin America. The CLIMANDES project (Climate services to support decision-making in the Andean Region) will address these issues in Peru. CLIMANDES supports the WMO Regional Training Centre (RTC) in Lima, which is responsible for the training of specialized human resources in meteorology and climatology in the South American Andes (Module 1). Furthermore, CLIMANDES will provide high-quality climate services to inform policy makers in the Andean region (Module 2). It is coordinated by the World Meteorological Organization (WMO) and constitutes a pilot project under the umbrella of the WMO-led Global Framework for Climate Services (GFCS). The project is funded by the Swiss Agency for Development and Cooperation (SDC) and runs from August 2012 - July 2015. Module 1 focuses on restructuring the curricula of Meteorology at the La Molina Agraria University (UNALM) and applied training of meteorologists of the Peruvian National Service of Meteorology and Hydrology (SENAMHI). In Module 2, the skills will be shared and developed in the production and delivery of high-quality climate products and services tailored to the needs of the decision makers in the pilot regions Cusco and Junín. Such services will benefit numerous sectors including agriculture, education, health, tourism, energy, transport and others. The goals of the modules 1 and 2 will be achieved through the collaboration of the UNALM, SENAMHI and the Federal Office of Meteorology and Climatology MeteoSwiss, with the support of the University of Bern (UNIBE), Meteodat and WMO.

  11. Experience in implementing projects in Eastern Europe

    International Nuclear Information System (INIS)

    Weichard, A.; Bauer, I.; Rieck, R.; Ziehm, R.

    2007-01-01

    The article covers the present projects and activities in Eastern Europe of Nukem Technologies GmbH. The company's East European business began in 1973 in the field of uranium trading. After difficult negotiations in the period of the ''cold war'' it became possible to enter into an agreement with the Soviet foreign trade organization, Techsnabexport, about purchases of uranium for Western nuclear power plants. In the course of Nukem's realignment in the late 1980s, the focus was shifted more and more to the possibility of exporting into other countries the technologies developed and proven in Germany. This included countries in Eastern Europe. The situation changed abruptly with the political opening of Eastern Europe. A large potential market opened to Nukem as a supplier of technologies and plants for waste treatment and, later, the wider area of decommissioning. The partners in Eastern Europe were interested in proven, modern solutions. The ensuing success was also due to the fact that Nukem, in the early nineties, hired specialists from the new German federal states who had studied in the Soviet Union and were familiar with Russian technology, language, and culture. Soliciting analogous projects in the countries of Eastern Europe other than the former Soviet Union was begun in a parallel process. Very soon it turned out that also the interim storage of spent fuel elements constituted a potential market. (orig.)

  12. Experience of international projects implementation at Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Zavialov, L.A. [Leningrad Nuclear Power Plant ' Rosenergoatom' , Leningrad Region, 188540, Sosnovy Bor (Russian Federation)

    2008-07-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  13. Experience of international projects implementation at Leningrad Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zavialov, L.A.

    2008-01-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  14. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  15. Napa River Sediment TMDL Implementation and Habitat Enhancement Project

    Science.gov (United States)

    Information about the SFBWQP Napa River Sediment TMDL Implementation and Habitat Enhancement Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  16. Analysis and Countermeasures of PPP Project Implementation Difficulties

    Directory of Open Access Journals (Sweden)

    Xu Yifeng

    2017-01-01

    Full Text Available Since the beginning of 1995, the model of PPP project construction was introduced in China. It has been widely used in many fields such as energy, municipal, and so on. It has accumulated a lot of experience in improving the investment system structure and guiding the social capital into the infrastructure field. But the mode of PPP project construction in the implementing process in different environment often encounters a lot of problems. Based on a large amount of analysis on the existing literature, this paper resorts out the PPP project model combining the problems occurred in the implementation process of PPP project, and summarizes corresponding countermeasures aiming at the problems in order to provide help for PPP project implementation in the future.

  17. Causes of project implementation delay in the Ethiopian Electric ...

    African Journals Online (AJOL)

    This study identifies the major sources of delay in the implementation of construction projects in the Ethiopian electric utility enterprise. It also investigates the magnitude of schedule variance and cost overrun experienced by the Universal Electric Access Program (UEAP)due to implementation delay. Primary data were ...

  18. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  19. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  20. Systemwide Implementation of Project-Based Learning: The Philadelphia Approach

    Science.gov (United States)

    Schwalm, Jason; Tylek, Karen Smuck

    2012-01-01

    Citywide implementation of project-based learning highlights the benefits--and the challenges--of promoting exemplary practices across an entire out-of-school time (OST) network. In summer 2009, the City of Philadelphia and its intermediary, the Public Health Management Corporation (PHMC), introduced project-based learning to a network of more…

  1. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  2. Challenges in Implementing FP7 Projects in the Public Institutions

    Directory of Open Access Journals (Sweden)

    Viorel VULTURESCU

    2012-06-01

    Full Text Available National Authority for Scientific Research (ANCS and Executive Unit for Higher Education, Research and Development and Innovation Funding (UEFISCDI participate to several projects funded under the Framework Programmes, since 1998. The staff from each the two organisations participating in projects are merely the same, typically from “international cooperation” departments. In each of the two organisations, dedicated teams were set and a distinct specialization emerged. In this respect, dedicated procedures and good practices in project management were developed. Even the Framework Programs had different structures and the focused was different (e.g. knowledge creation, EU problem solving, scientific support for policies and programs, etc., the funding instruments (projects were not radically different from a Framework Program to another, so the staff could gain experience in managing this type of projects. Experience and expertise gained during this long period of time led to definition of a general framework within the two institutions and setting up of a general guideline for participation to this type of projects. The main dimensions of this framework are: project team organization, project management process, managing results and risk, organisational framework, good practices, factors which ensure success in project implementation.The paper presents a specific framework for FP 7 project implementation and how this framework is applied by both organisations, a set of rules and procedures that should be followed by any organisation, in particular governmental ones, participating in FP 7 projects and a set of good practices developed by ANCS and UEFISCDI.

  3. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  4. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  5. Yakima Fisheries Project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (open-quotes adaptive managementclose quotes); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery

  6. Yakima Fisheries Project : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  7. GREENWAY IN ITALY: EXAMPLES OF PROJECTS AND IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Pasquale Dal Sasso

    2012-06-01

    Full Text Available The study analyses the greenway projects implemented in Italy, summarising their characteristics in a table that contains basic information concerning the geographical location, year of implementation, the type of layout and size, the state of implementation; the Institution that proposed the implementation, the official name, the territorial feature, the socio-economic and cultural aims, references to bibliographic and web resources and to their inclusion in plans and projects. The analysis has allowed to verify the compliance of individual contributions to the definitions attributed to the greenway from national and international associations. It has been possible to verify the use of greenways as physical support to spatial planning and the promotion of economic and productive development of rural areas.

  8. Ecological impact study methodology for hydrotechnical projects

    International Nuclear Information System (INIS)

    Manoliu, Mihai; Toculescu, Razvan

    1993-01-01

    Besides the expected benefits, hydrotechnical projects may entail unfavorable effects on the hydrological regime, environment, health and living conditions of the population. Rational water resource management should take into consideration both the favorable and unfavorable effects. This implies the assessment of socio-economic and environmental impacts of the changes of the hydrological regime. The paper proposes a methodology for carrying out impact studies of hydrotechnical projects. The results of the work are presented graphically on the basis of composite programing. A summary of mathematical methods involved in impact study design is also presented. (authors)

  9. Methodology of impact assessment of research projects

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2014-01-01

    In the context of the management of research projects development it is necessary to have tools to monitor and evaluate progress and the performance of the projects, as well as their results and the impact on society (international agencies of the United Nations and the States 2002 and 2005 Paris Declaration), with the objective of to ensure their contribution to the social and economic development of countries. Many organizations, agencies and Governments apply different methodologies (IDB, World Bank, UNDP, ECLAC, UNESCO; UNICEF, Canada, Japan, other) for these purposes. In the results-based project management system not only paramount is the process or product itself, but also the result or impact of the project (if the program/project produced the effects desired persons, households and institutions and whether those effects are attributable to the intervention of the program / project). The work shows a methodology that allows for a qualitative and quantitative evaluation of impact of research projects and has been result of experience in project management of international collaboration with the International Agency for Atomic Energy (IAEA) and the Cuban Nuclear programme. (author)

  10. From innovation to implementation - SME collaboration in student projects

    DEFF Research Database (Denmark)

    Bridgwood, Ian

    The Center for Bachelor of Engineering Studies at the Technical University of Denmark (DTU Diplom) [1] provides B.Eng. programs with the Conceive Design Implement and Operate framework [2] as a central element. Courses are designed to be a source of innovation, particularly in relation to small a...... and medium sized enterprises (SME) in the region. The project based courses teach students to undertake the analysis, design and implementation of systems which are relevant to and in cooperation with SMEs....

  11. Implementation of NUREG-1318 guidance within the Yucca Mountain Project

    International Nuclear Information System (INIS)

    La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

    1990-01-01

    The US Department of Energy's Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ''Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements'' for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs

  12. An empirical identification and categorisation of training best practices for ERP implementation projects

    Science.gov (United States)

    Esteves, Jose Manuel

    2014-11-01

    Although training is one of the most cited critical success factors in Enterprise Resource Planning (ERP) systems implementations, few empirical studies have attempted to examine the characteristics of management of the training process within ERP implementation projects. Based on the data gathered from a sample of 158 respondents across four stakeholder groups involved in ERP implementation projects, and using a mixed method design, we have assembled a derived set of training best practices. Results suggest that the categorised list of ERP training best practices can be used to better understand training activities in ERP implementation projects. Furthermore, the results reveal that the company size and location have an impact on the relevance of training best practices. This empirical study also highlights the need to investigate the role of informal workplace trainers in ERP training activities.

  13. REGULATORY FUNDAMENTALS FOR IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS IN INDUSTRY

    Directory of Open Access Journals (Sweden)

    L. V. Gubich

    2016-01-01

    Full Text Available The article provides an overview of the existing regulatory basis for the development of IIST. The features of IT projects management and a brief description of methodological recommendations on implementation of IT projects of the State scientific and technical Program «Electronic enterprise resource planning (CALS-ERP-technology» for 2011–2015 are considered.

  14. Watershed manipulation project: Field implementation plan for 1990-1992

    International Nuclear Information System (INIS)

    Erickson, H.; Narahara, A.M.; Rustad, L.E.; Mitchell, M.; Lee, J.

    1993-02-01

    The Bear Brook Watershed in Maine (BBWM) was established in 1986 at Lead Mountain, Maine as part of the Environmental Protection Agency's (EPA) Watershed Manipulation Project (WPM). The goals of the project are to: (1) assess the chemical response of a small upland forested watershed to increased loadings of SO4, (2) determine interactions among biogeochemical mechanisms controlling watershed response to acidic deposition, and (3) test the assumptions of the Direct/Delayed Response Programs (DDRP) computer models of watershed acidification. The document summarizes the field procedures used in the establishment and initial implementation of the plot- and catchment- scale activities at the BBWM, and outlines plans for 1990-02 project activities

  15. Results of nine Connecticut Cancer Partnership implementation projects.

    Science.gov (United States)

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  16. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  17. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  18. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  19. Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

    Directory of Open Access Journals (Sweden)

    Mohammed Sani

    2018-03-01

    Full Text Available Public Private Partnership (PPP Housing scheme in Nigeria is intended to complement government effort toward increasing housing stock and providing affordable housing in the country. However, Bauchi state government adopted the construction of 5,000 phases PPP Housing. But 6 years after the commencement of the scheme, only a few numbers of housing units were completed and commissioned. Therefore, it becomes imperative to carry out research on the impact level of those factors affecting the implementation of the scheme. The aim of the study is to investigate impact level of factors affecting the implementation of PPP housing projects in Bauchi state with a view to find out possible ways that will improve the implementation of the scheme. The descriptive and explorative research design was adopted for this study. 54 structured Questionnaires were administered to construction professional’s staff under private housing developers and relevant government agencies in Bauchi state. 42 valid Questionnaires were retrieved and analysed with SPSS software. The result of the quantitative data analysis shows that creation of favourable investment environment and government support have very high Impact on the implementation of Bauchi PPP housing projects. Therefore, this study recommends that government and other stakeholders should give more attention to the creation of favourable investment environment, support in policy formulation and managerial strategies in the future for improving the implementation of PPP housing projects.

  20. Identifying and prioritizing barriers to implementation of smart energy city projects in Europe: An empirical approach

    International Nuclear Information System (INIS)

    Mosannenzadeh, Farnaz; Di Nucci, Maria Rosaria; Vettorato, Daniele

    2017-01-01

    Successful implementation of smart energy city projects in Europe is crucial for a sustainable transition of urban energy systems and the improvement of quality of life for citizens. We aim to develop a systematic classification and analysis of the barriers hindering successful implementation of smart energy city projects. Through an empirical approach, we investigated 43 communities implementing smart and sustainable energy city projects under the Sixth and Seventh Framework Programmes of the European Union. Validated through literature review, we identified 35 barriers categorized in policy, administrative, legal, financial, market, environmental, technical, social, and information-and-awareness dimensions. We prioritized these barriers, using a novel multi-dimensional methodology that simultaneously analyses barriers based on frequency, level of impact, causal relationship among barriers, origin, and scale. The results indicate that the key barriers are lacking or fragmented political support on the long term at the policy level, and lack of good cooperation and acceptance among project partners, insufficient external financial support, lack of skilled and trained personnel, and fragmented ownership at the project level. The outcome of the research should aid policy-makers to better understand and prioritize implementation barriers to develop effective action and policy interventions towards more successful implementation of smart energy city projects. - Highlights: • A solid empirical study on the implementation of European smart energy city projects. • We found 35 barriers in nine dimensions; e.g. policy, legal, financial, and social. • We suggested a new multi-dimensional methodology to prioritize barriers. • Lacking or fragmented political support on the long term is a key barrier. • We provided insights for action for project coordinators and policy makers.

  1. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  2. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  3. The project organization as a policy tool in implementing welfare reforms in the public sector.

    Science.gov (United States)

    Jensen, Christian; Johansson, Staffan; Löfström, Mikael

    2013-01-01

    Organizational design is considered in policy literature as a forceful policy tool to put policy to action. However, previous research has not analyzed the project organization as a specific form of organizational design and, hence, has not given much attention to such organizations as a strategic choice when selecting policy tools. The purpose of the article is to investigate the project as a policy tool; how do such temporary organizations function as a specific form of organization when public policy is implemented? The article is based on a framework of policy implementation and is illustrated with two welfare reforms in the Swedish public sector, which were organized and implemented as project organizations. The case studies and the analysis show that it is crucial that a project organization fits into the overall governance structure when used as a policy tool. If not, the project will remain encapsulated and will not have sufficient impact on the permanent organizational structure. The concept of encapsulation indicates a need to protect the project from a potential hostile environment. The implication of this is that organizational design as a policy tool is a matter that deserves more attention in the strategic discussion on implementing public policies and on the suitability of using certain policy tools. Copyright © 2012 John Wiley & Sons, Ltd.

  4. Geopolitical model of investment power station construction project implementation

    Science.gov (United States)

    Malafeyev, Oleg; Farvazov, Konstantin; Zenovich, Olga; Zaitseva, Irina; Kostyukov, Konstantin; Svechinskaya, Tatiana

    2018-04-01

    Two geopolitical actors implement a geopolitical project that involves transportaion and storage of some commodities. They interact with each other through a transport network. The network consists of several interconnected vertices. Some of the vetrices are trading hubs, storage spaces, production hubs and goods buyers. Actors wish to satify the demand of buyers and recieve the highest possible profit subject to compromise solution principle. A numerical example is given.

  5. PRINCIPLES OF ASSESSING THE SOCIAL EFFECTS BY IMPLEMENTING INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Denis SIMOV

    2013-12-01

    Full Text Available Financial instruments are efficient – in terms of resource – mobilization of cohesion policy resources to achieve the objectives of the strategy. Rules of forming the investment strategy, particularly in State structures, by using the budget funds of the Republic of Moldova, must include as one of the criteria for project selection, the achieve of a positive social effect associated with its implementation.

  6. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  7. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  8. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  9. Implementation of a pollution control projects as a mitigating measure for the environmental impacts in UN-RIO production platforms; Implementacao de um projeto de controle da poluicao como medida mitigadora de impactos ambientais em plataformas de producao da UN-RIO

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Ana Paula A.; Machado, Mariana E.R.; Rocha, Valmir G. da [PETROBRAS, Rio de Janeiro, RJ (Brazil). Unidade de Negocio de Exploracao e Producao

    2004-07-01

    The activity of offshore oil and gas exploration and production (E and P) has the potential to cause environmental impacts, mainly due to the nature of the products involved. Therefore, it is of fundamental importance that all possible impacts derived from this activity be identified so that mitigating measures can be taken. The work described here proposes, as a mitigating measure for some of the more relevant environmental impacts related to the offshore E and P activity, the implementation of a Pollution Control Project at UN-RIO's oil and gas platforms. The Project includes actions for the adequate environmental management of the atmospheric emissions, effluents and solid residues generated during oil and gas production activities. The Project also proposes actions related to the monitoring of relevant parameters during the operations, the elaboration of operational procedures for the pollution control systems and equipment, a preventive equipment maintenance policy and the training in standard procedures for critical activities. Therefore, the implementation of such a Project is intrinsically related to the maintenance of the environmental quality in the area where UN-RIO's E and P activities take place. (author)

  10. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  11. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  12. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  13. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  14. Impact of the Implementation of the 9- Years Universal Basic ...

    African Journals Online (AJOL)

    The study focuses on the impact of the implementation of the Universal Basic Education 9-3-4 system of education. Its general objective is to identify and access the impact of the implementation of the Universal Basic Education 9- 3-4 programme while the scope covers the public primary and junior secondary schools in Imo ...

  15. Enhancing public project implementation in Botswana during the NDP 11 period

    Directory of Open Access Journals (Sweden)

    Emmanuel Botlhale

    2017-08-01

    Full Text Available Successful project implementation is critical in development planning. If there is poor project implementation, economic development will be stalled. Generally, public project implementation has a chequered history. This is particularly true in developing countries which are characterised by low levels of project management maturity. The objective of this article is to review public project implementation in Botswana and recommend improvements for the National Development Plan (NDP 11 period (2017/2018-2022/2023. The article used the survey strategy and adopted the descriptive approach. Data collection sources were mixed, that is, primary and secondary sources. It concluded that public projects are either poorly implemented (i.e. not implemented in accordance with the ‘Project Management Triple Constraint’ of cost, time and scope or not implemented at all. Given a constrained revenue envelope post 2008, there is a need for improved project implementation. Amongst others, this calls for professional public project implementation so that NDPs become a reality.

  16. Price anderson nuclear safety rules: Impacts of implementation

    International Nuclear Information System (INIS)

    Varchol, B.D.; Alhadeff, N.

    1995-01-01

    New nuclear safety rules are being implemented at Department of Energy sites. This paper examines the impacts of these rules as each site decides where rules will be implemented, whether implementation activities will be centralized, and how the site management and staff will be introduced to the new rules

  17. Environmental impact assessment: Process and implementation

    International Nuclear Information System (INIS)

    Chen, S.Y.; Tsai, S.Y.

    1989-01-01

    In this paper, the procedures and issues regarding the preparation of an environmental impact assessment in accordance with the National Environmental Policy Act (NEPA) as promulgated by the US Congress in 1969 are discussed. NEPA procedures and requirements are covered in general, while particular attention is given to the preparation of the environmental impact assessment. Also included is a discussion of the social impact assessment. The aim of the social impact assessment is to address the social issues involved in enhancing public understanding of the hazardous risks, thereby mitigating any conflicts that may arise in the NEPA process. 3 refs., 1 fig., 1 tab

  18. Application of environmental impact assessment in Spain (1989-2008): the case of Road Projects

    International Nuclear Information System (INIS)

    Barbero Rodriguez, J.; Espigares Pinilla, T.

    2010-01-01

    In this study we analyze the application in Spain of the Environmental Impact Assessment (EIA) along the first 20 years since its implementation, paying special attention to road projects. We revised all Environmental Impact Statement (EISs) published during the period 1989-2008 and monitored, among others, the following variables; the record of decision (favorable or unfavorable) of the State Authority, the type of ecosystem affected by the projects and the mitigation measures required to the developer to implement the project. The results allow us to evaluate the effectiveness of EIA procedure for road projects and to suggest some practical recommendations to improve the quality of EISs. (Author) 13 refs.

  19. Training implementation matrix. Spent Nuclear Fuel Project (SNFP)

    International Nuclear Information System (INIS)

    EATON, G.L.

    2000-01-01

    This Training Implementation Matrix (TIM) describes how the Spent Nuclear Fuel Project (SNFP) implements the requirements of DOE Order 5480.20A, Personnel Selection, Qualification, and Training Requirements for Reactor and Non-Reactor Nuclear Facilities. The TIM defines the application of the selection, qualification, and training requirements in DOE Order 5480.20A at the SNFP. The TIM also describes the organization, planning, and administration of the SNFP training and qualification program(s) for which DOE Order 5480.20A applies. Also included is suitable justification for exceptions taken to any requirements contained in DOE Order 5480.20A. The goal of the SNFP training and qualification program is to ensure employees are capable of performing their jobs safely and efficiently

  20. Economic Efficiency and Investment Implementation in Energy Saving Projects

    Directory of Open Access Journals (Sweden)

    Venelin Terziev

    2017-09-01

    Full Text Available Investment in building thermoinsulation is a subject to appraisal for efficiency from the position of discounted cash flows taken specifically by energy saving. The appraisal of investment as optimal is attended by achieving the shortest term for investment implementation, the lowest investment outlays, the maximum total net value of energy savings, the shortest investment payback period. The complex application of the dynamic methods for appraising economic efficiency of an investment – net present value, internal rate of return, profitability index and discounted payback period, involves drawing of particular values which comparison definitely will show if this kind of investment is practically “attractive”. However, the question for significance weight of each of these indicators above in decision making for implementation a particular real investment still remains unsolved. This requires working out a system of criteria, priorities that can determine which of the indicators for economic efficiency of specific investment project will have the highest significance.

  1. Implementation of the e-Bug Project in Greece.

    Science.gov (United States)

    Gennimata, Dimitra; Merakou, Kyriakoula; Barbouni, Anastasia; Kremastinou, Jenny

    2011-06-01

    The e-Bug pack and web site educational material has been translated and adapted to the Greek language and educational background, and implemented throughout Greece as a supplementary educational resource in elementary and junior high schools. Elementary and junior high school teachers in Greece have actively participated in the development of the e-Bug educational resource and supported the implementation of all e-Bug activities. Dissemination to all key national stakeholders has been undertaken, and endorsement has been obtained from educational and medical associations, societies and institutions. Independent evaluation has been carried out, as part of dissertation thesis projects, for postgraduate studies. The e-Bug educational resource provides all the essentials for the dissemination of good health behaviours in hygiene, monitoring the spread of infection and the prudent use of antibiotics, to the youth of this country. Its contribution is expected to be evident in the next adult generation.

  2. Assessing human rights impacts in corporate development projects

    International Nuclear Information System (INIS)

    Salcito, Kendyl; Utzinger, Jürg; Weiss, Mitchell G.; Münch, Anna K.; Singer, Burton H.; Krieger, Gary R.; Wielga, Mark

    2013-01-01

    Human rights impact assessment (HRIA) is a process for systematically identifying, predicting and responding to the potential impact on human rights of a business operation, capital project, government policy or trade agreement. Traditionally, it has been conducted as a desktop exercise to predict the effects of trade agreements and government policies on individuals and communities. In line with a growing call for multinational corporations to ensure they do not violate human rights in their activities, HRIA is increasingly incorporated into the standard suite of corporate development project impact assessments. In this context, the policy world's non-structured, desk-based approaches to HRIA are insufficient. Although a number of corporations have commissioned and conducted HRIA, no broadly accepted and validated assessment tool is currently available. The lack of standardisation has complicated efforts to evaluate the effectiveness of HRIA as a risk mitigation tool, and has caused confusion in the corporate world regarding company duties. Hence, clarification is needed. The objectives of this paper are (i) to describe an HRIA methodology, (ii) to provide a rationale for its components and design, and (iii) to illustrate implementation of HRIA using the methodology in two selected corporate development projects—a uranium mine in Malawi and a tree farm in Tanzania. We found that as a prognostic tool, HRIA could examine potential positive and negative human rights impacts and provide effective recommendations for mitigation. However, longer-term monitoring revealed that recommendations were unevenly implemented, dependent on market conditions and personnel movements. This instability in the approach to human rights suggests a need for on-going monitoring and surveillance. -- Highlights: • We developed a novel methodology for corporate human rights impact assessment. • We piloted the methodology on two corporate projects—a mine and a plantation. • Human

  3. Assessing human rights impacts in corporate development projects

    Energy Technology Data Exchange (ETDEWEB)

    Salcito, Kendyl, E-mail: kendyl.salcito@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Utzinger, Jürg, E-mail: juerg.utzinger@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); Weiss, Mitchell G., E-mail: Mitchell-g.Weiss@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); Münch, Anna K., E-mail: annak.muench@gmail.com [Emerging Pathogens Institute, University of Florida, Gainesville, FL 32610 (United States); Singer, Burton H., E-mail: bhsinger@epi.ufl.edu [Emerging Pathogens Institute, University of Florida, Gainesville, FL 32610 (United States); Krieger, Gary R., E-mail: gkrieger@newfields.com [NewFields, LLC, Denver, CO 80202 (United States); Wielga, Mark, E-mail: wielga@nomogaia.org [NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States)

    2013-09-15

    Human rights impact assessment (HRIA) is a process for systematically identifying, predicting and responding to the potential impact on human rights of a business operation, capital project, government policy or trade agreement. Traditionally, it has been conducted as a desktop exercise to predict the effects of trade agreements and government policies on individuals and communities. In line with a growing call for multinational corporations to ensure they do not violate human rights in their activities, HRIA is increasingly incorporated into the standard suite of corporate development project impact assessments. In this context, the policy world's non-structured, desk-based approaches to HRIA are insufficient. Although a number of corporations have commissioned and conducted HRIA, no broadly accepted and validated assessment tool is currently available. The lack of standardisation has complicated efforts to evaluate the effectiveness of HRIA as a risk mitigation tool, and has caused confusion in the corporate world regarding company duties. Hence, clarification is needed. The objectives of this paper are (i) to describe an HRIA methodology, (ii) to provide a rationale for its components and design, and (iii) to illustrate implementation of HRIA using the methodology in two selected corporate development projects—a uranium mine in Malawi and a tree farm in Tanzania. We found that as a prognostic tool, HRIA could examine potential positive and negative human rights impacts and provide effective recommendations for mitigation. However, longer-term monitoring revealed that recommendations were unevenly implemented, dependent on market conditions and personnel movements. This instability in the approach to human rights suggests a need for on-going monitoring and surveillance. -- Highlights: • We developed a novel methodology for corporate human rights impact assessment. • We piloted the methodology on two corporate projects—a mine and a plantation.

  4. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  5. Implementing local projects to reduce the stigma of mental illness.

    Science.gov (United States)

    Warner, Richard

    2008-01-01

    This editorial describes strategies used and the lessons learned in implementing two local anti-stigma projects. The WPA Programme to Reduce Stigma and Discrimination Because of Schizophrenia established projects to fight stigma in 20 countries, using social-marketing techniques to enhance their effectiveness. First steps at each site were to establish an action committee and conduct a survey of perceived stigma. Based on survey results, the action committees selected a few homogeneous and accessible target groups, such as employers, and criminal justice personnel. Messages and media were selected, tested, and refined. Guidelines are provided for setting up a consumer (service-user) speakers' bureau and for establishing a media-watch organization, which can lobby news and entertainment media to exclude negative portrayals of people with mental illness. Improvements in knowledge about mental illness were effected in high school students and criminal justice personnel. Positive changes in attitude towards people with mental illness were achieved with high school students, but were more difficult to achieve with police officers. Local antistigma projects can be effective in reducing stigma and relatively inexpensive. The involvement of consumers is important in working with police officers. Project organizers should be on the lookout for useful changes that can become permanent.

  6. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  7. The Formation of the Model of Diagnosing the Results Implementation of of Consulting Projects for Enterprises

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-11-01

    Full Text Available In the article the graphic-analytical model of diagnostics of results of implementation of consulting projects is formed, which allows to: take into consideration interests of participants to the project on choice of methods and methodologies of diagnosing; allocate alternative sets of business indicators for each object of impact in terms of consulting project; establish economic and non-economic criteria for evaluating the effectiveness of consulting, as well as monitoring of indicators and automated processing of diagnostic results to control deviations from the optimal values of the diagnosed project results. A structural-logical model of formation of alternative sets of indicators and choice of indicators for diagnostics of results of consulting projects has been developed. The elements of the enterprise management system have been codified to harmonize the corresponding indicators with their subsequent combination within the proposed sets. The control system objects and their elements have been allocated. The groups of indicators according to the technology of Balanced Score Card (BSC have been presented. The prospect of further research is the economic assessment of implementation of the diagnosed consulting projects, which will reveal the links between the parameters of production-economic activity and the assessment of projects, and allows choose the most significant ones.

  8. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  10. Implementation and Impact of ISO 9001

    NARCIS (Netherlands)

    B. Manders (Basak)

    2015-01-01

    markdownabstract__Abstract __ The ISO 9001 quality management standard has been implemented by more than one million organizations in 187 countries since its introduction in 1987. A newer version of ISO 9001 is planned to be introduced in 2015. Even though it is widely used by organizations to

  11. Designing, implementing and monitoring social impact mitigation strategies: Lessons from Forest Industry Structural Adjustment Packages

    International Nuclear Information System (INIS)

    Loxton, Edwina A.; Schirmer, Jacki; Kanowski, Peter

    2013-01-01

    Social impact mitigation strategies are implemented by the proponents of policies and projects with the intent of reducing the negative, and increasing the positive social impacts of their activities, and facilitating the achievement of policy/project goals. Evaluation of mitigation strategies is critical to improving their future success and cost-effectiveness. This paper evaluates two Forest Industry Structural Adjustment Packages (FISAP) implemented in Australia in the 1990s to 2000s as part of broader policy changes that reduced access to timber from publicly owned native forests. It assesses the effectiveness of the structure, design, implementation and monitoring of the FISAPs, and highlights the interactions between these four elements and their influence on social impacts. The two FISAPs were found to be effective in terms of reducing negative impacts, encouraging positive impacts and contributing towards policy goals, although they did not mitigate negative impacts in all cases, and sometimes interacted with external factors and additional policy changes to contribute to significant short and long term negative impacts. -- Highlights: ► Mitigation strategies aim to reduce negative and enhance positive social impacts ► Mitigation strategy design, implementation, and monitoring are critical to success ► Effective mitigation enhanced the capacity of recipients to respond to change ► Mitigation strategies influenced multiple interacting positive and negative impacts ► Success required good communication, transparency, support, resources and timing

  12. Russian energy efficiency projects: lessons learnt from Activities Implemented Jointly pilot phase

    International Nuclear Information System (INIS)

    Korppoo, Anna

    2005-01-01

    Russia needs to improve the efficiency of energy. Failure to do so will retard the economic recovery of the country, but the energy sector is lacking both domestic and foreign investments. JI projects could provide the underfinanced Russian energy sector with additional investments. AIJ pilot project experiences provide an overview of the potential difficulties for future JI projects. Institutional problems were the most important category. Most of these problems remain, and the lack of ratification of the Kyoto Protocol by Russia has formed a new very significant barrier. Implementation level problems caused some problems to AIJ projects, but they are likely to have less impact on the better prepared JI projects. The character of funding-related problems has changed: for AIJ projects the main problem was that emission reductions could not be credited, whereas future JI projects will experience more competition in the Kyoto market where the overall investment climate and the availability of local cofunding are more relevant. Therefore, the unfinished economic and energy sector reforms currently discourage JI investments. The project experiences so far have been dismal, and if Russian policy-makers cannot improve this performance, only few JI projects can be expected in the future

  13. Assessing corporate project impacts in changeable contexts: A human rights perspective

    International Nuclear Information System (INIS)

    Salcito, Kendyl; Singer, Burton H.; Krieger, Gary R.; Weiss, Mitchell G.; Wielga, Mark; Utzinger, Jürg

    2014-01-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact assessment

  14. Assessing corporate project impacts in changeable contexts: A human rights perspective

    Energy Technology Data Exchange (ETDEWEB)

    Salcito, Kendyl, E-mail: kendyl.salcito@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Singer, Burton H., E-mail: bhsinger@epi.ufl.edu [Emerging Pathogens Institute, University of Florida, Gainesville, FL 32610 (United States); Krieger, Gary R., E-mail: gkrieger@newfields.com [NewFields, LLC, Denver, CO 80202 (United States); Weiss, Mitchell G., E-mail: mitchell-g.weiss@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); Wielga, Mark, E-mail: wielga@nomogaia.org [NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Utzinger, Jürg, E-mail: juerg.utzinger@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland)

    2014-07-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact

  15. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  16. Investigating the Practical Impact of Agile Practices on the Quality of Software Projects in Continuous Delivery

    OpenAIRE

    Olumide Akerele; Muthu Ramachandran; Mark Dixon

    2014-01-01

    Various factors affect the impact of agile factors on the continuous delivery of software projects. This is a major reason why projects perform differently- some failing and some succeeding- when they implement some agile practices in various environments. This is not helped by the fact that many projects work within limited budget while project plans also change-- making them to fall into some sort of pressure to meet deadline when they fall behind in their planned work. This study investiga...

  17. Implementing Kernel Methods Incrementally by Incremental Nonlinear Projection Trick.

    Science.gov (United States)

    Kwak, Nojun

    2016-05-20

    Recently, the nonlinear projection trick (NPT) was introduced enabling direct computation of coordinates of samples in a reproducing kernel Hilbert space. With NPT, any machine learning algorithm can be extended to a kernel version without relying on the so called kernel trick. However, NPT is inherently difficult to be implemented incrementally because an ever increasing kernel matrix should be treated as additional training samples are introduced. In this paper, an incremental version of the NPT (INPT) is proposed based on the observation that the centerization step in NPT is unnecessary. Because the proposed INPT does not change the coordinates of the old data, the coordinates obtained by INPT can directly be used in any incremental methods to implement a kernel version of the incremental methods. The effectiveness of the INPT is shown by applying it to implement incremental versions of kernel methods such as, kernel singular value decomposition, kernel principal component analysis, and kernel discriminant analysis which are utilized for problems of kernel matrix reconstruction, letter classification, and face image retrieval, respectively.

  18. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  19. PROSPECTS OF CCS PROJECTS IMPLEMENTATION IN RUSSIA: ENVIRONMENTAL PROTECTION AND ECONOMIC OPPORTUNITIES

    Directory of Open Access Journals (Sweden)

    Pavel Tcvetkov

    2016-04-01

    Full Text Available The urgency of environmental protection is determined by its intensive change because of human impact, which, among other things, accompanied by an increasing of carbon dioxide (CO2 emissions. One of the ways to reduce the emission is Carbon Capture and Storage (CCS technologies. To date, developed countries have successfully implemented a number of CCS demonstration projects. Their main purpose is to study the effectiveness of CO2 storage. Russia is one of the world’s largest producers of CO2 emissions. However, CO2 capture and storage issues are not studied by Russian enterprises due to the absence of environmental taxes. The experience of developed countries shows that CO2 storage projects, in addition to the reduction of anthropogenic impact, can be commercially effective not only by reducing the tax burden. This review presents the analysis of international experience in the field of CO2 capture and storage. Given the immaturity of technology and lack of the necessary volume of statistical data, it was an attempt to determine the minimum conditions, which permit the implementation of CCS projects in Russian oil fields. On the basis of the Russian development forecast and the fuel balance structure the volumes of CO2 emissions in the 2016–2030 years were calculated. According to significant difference in opinions about the feasibility of CCS implementation in Russia, this review presents the main arguments for and against such projects. Evaluation of the potential effectiveness of CCS projects to enhance oil recovery factor showed that in spite of the absence of CO2 emissions taxes, such projects could be commercially effective in Russia due to the increase in oil recovery.

  20. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  1. Survey to promote an action implemented jointly project; Kyodo jisshi katsudo project suishin chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the 1st (1995) conference of the nations which concluded the Framework Convention on Climate Change, decided on was a trial implementation of an action implemented jointly (AIJ) project with developing countries on the voluntary basis. In the Asia region, emission of greenhouse effect gas is remarkably increasing in accordance with rapid development of economy, and it is important to appropriately support through this project both economic development and energy demand in Asia. Taking the circumstance into consideration, the survey was conducted to contribute to activating the AIJ Japan Program. As the AIJ of leading developed countries, recognized were 25 (U.S.), 6 (Holland), 8 (Germany), 2 (Norway) projects. As to the AIJ in Southeast Asia, China and India, Indonesia is actively participating in the project, but others less actively. Concerning the project needs in every country, heightening of power plant efficiency, enhancement of efficiency in the transportation sector, new energy utilization, recovery of methane gas, etc. acquire a priority. 21 figs., 31 tabs.

  2. Implementation of the Hungarian RW management project: Results and lessons

    International Nuclear Information System (INIS)

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-01-01

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding

  3. Implementing Brief Interventions in Health Care: Lessons Learned from the Swedish Risk Drinking Project

    Directory of Open Access Journals (Sweden)

    Per Nilsen

    2011-09-01

    Full Text Available The Risk Drinking Project was a national implementation endeavour in Sweden, carried out from 2004 to 2010, based on a government initiative to give alcohol issues a more prominent place in routine primary, child, maternity and occupational health care. The article describes and analyses the project. Critical factors that were important for the results are identified. The magnitude of the project contributed to its reach and impact in terms of providers’ awareness of the project goals and key messages. The timing of the project was appropriate. The increase in alcohol consumption in Sweden and diminished opportunities for primary prevention strategies since entry to the European Union in 1995 have led to increased expectations for health care providers to become more actively involved in alcohol prevention. This awareness provided favourable conditions for this project. A multifaceted approach was used in the project. Most educational courses were held in workshops and seminars to encourage learning-by-doing. Motivational interviewing was an integral aspect. The concept of risk drinking was promoted in all the activities. Subprojects were tailored to the specific conditions of each respective setting, building on the skills the providers already had to modify existing work practices. Nurses were afforded a key role in the project.

  4. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    Science.gov (United States)

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  5. Assessment on the impact of plasma television implementation on ...

    African Journals Online (AJOL)

    Assessment on the impact of plasma television implementation on the teaching learning process of mathematics class: the case on selected practicum sites (high schools) for education faculty of Jimma University.

  6. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  7. Waste-to-energy technologies and project implementation

    CERN Document Server

    Rogoff, Marc J

    2011-01-01

    This book covers in detail programs and technologies for converting traditionally landfilled solid wastes into energy through waste-to-energy projects. Modern Waste-to-Energy plants are being built around the world to reduce the levels of solid waste going into landfill sites and contribute to renewable energy and carbon reduction targets. The latest technologies have also reduced the pollution levels seen from early waste incineration plants by over 99 per cent. With case studies from around the world, Rogoff and Screve provide an insight into the different approaches taken to the planning and implementation of WTE. The second edition includes coverage of the latest technologies and practical engineering challenges as well as an exploration of the economic and regulatory context for the development of WTE.

  8. Impact of staff organizational culture on the implementation of ...

    African Journals Online (AJOL)

    This study surveyed the Impact of Library Staff Organizational Culture on the Implementation of Automation in Libraries of Federal Universities in the North- East Zone of Nigeria. The objectives of the Study were to determine: the level of implementation of automation of libraries in Federal Universities of the North- East Zone ...

  9. ERP implementations and their impact upon management accountants

    OpenAIRE

    Sangster, Alan; Leech, Stewart A.; Grabski, Severin

    2009-01-01

    This paper considers the impact of ERP implementations upon the role of management accountants, upon management accounting in general, and upon business processes. It does so in the context of the perceived success of the ERP implementation. A postal questionnaire was circulated to almost 700 management accountants working in large UK-based organisations. It finds that under successful ERP implementations, management accountants have time for other, less mundane activities and their role beco...

  10. Impact of National Culture Dimensions on Scrum Implementations

    OpenAIRE

    Zhao, Chengqian

    2015-01-01

    Context. Scrum is one of the most common used Agile method. It is based on empiricism. Scrum only provides a framework but the detailed implementations in practice are very different. and the environment has a big influence on it. National culture is proven to have an impact on Agile methodology. The implementation of Scrum practices should be influenced by national culture as well. Objectives. This paper reveals the relationship between national culture and Scrum implementation. It explores ...

  11. A Conflict’s Impact on Project Goals and Reputation Risk : Lessons from Kosovo Privatization Program

    OpenAIRE

    Bach, Karl

    2008-01-01

    When designing and implementing a project in a conflict-affected country, some of the conflict's more obvious impacts-damage to infrastructure and energy supplies, are apt to immediately come to mind. However, based on the experiences with the Kosovo privatization program, there are additional problems related to a conflict's aftermath that may be overlooked during a project's design but w...

  12. Implementation and impact of ICD-10 (Part II).

    Science.gov (United States)

    Rahmathulla, Gazanfar; Deen, H Gordon; Dokken, Judith A; Pirris, Stephen M; Pichelmann, Mark A; Nottmeier, Eric W; Reimer, Ronald; Wharen, Robert E

    2014-01-01

    The transition from the International Classification of Disease-9(th) clinical modification to the new ICD-10 was all set to occur on 1 October 2015. The American Medical Association has previously been successful in delaying the transition by over 10 years and has been able to further postpone its introduction to 2015. The new system will overcome many of the limitations present in the older version, thus paving the way to more accurate capture of clinical information. The benefits of the new ICD-10 system include improved quality of care, potential cost savings, reduction of unpaid claims, and improved tracking of healthcare data. The areas where challenges will be evident include planning and implementation, the cost to transition, a shortage of qualified coders, training and education of the healthcare workforce, and a loss of productivity when this occurs. The impacts include substantial costs to the healthcare system, but the projected long-term savings and benefits will be significant. Improved fraud detection, accurate data entry, ability to analyze cost benefits with procedures, and enhanced quality outcome measures are the most significant beneficial factors with this change. The present Current Procedural Terminology and Healthcare Common Procedure Coding System code sets will be used for reporting ambulatory procedures in the same manner as they have been. ICD-10-PCS will replace ICD-9 procedure codes for inpatient hospital services. The ICD-10-CM will replace the clinical code sets. Our article will focus on the challenges to execution of an ICD change and strategies to minimize risk while transitioning to the new system. With the implementation deadline gradually approaching, spine surgery practices that include multidisciplinary health specialists have to anticipate and prepare for the ICD change in order to mitigate risk. Education and communication is the key to this process in spine practices.

  13. Economic Impact of CDM Implementation through Alternate Energy Resource Substitution

    Directory of Open Access Journals (Sweden)

    K.J. Sreekanth

    2013-02-01

    Full Text Available Since the Kyoto protocol agreement, Clean Development Mechanism (CDM hasgarnered large emphasis in terms of certified emission reductions (CER not only amidst the globalcarbon market but also in India. This paper attempts to assess the impact of CDM towardssustainable development particularly in rural domestic utility sector that mainly includes lightingand cooking applications, with electricity as the source of energy. A detailed survey has undertakenin the state of Kerala, in southern part of India to study the rural domestic energy consumptionpattern. The data collected was analyzed that throws insight into the interrelationships of thevarious parameters that influence domestic utility sector pertaining to energy consumption byusing electricity as the source of energy. The interrelationships between the different parameterswere modeled that optimizes the contribution of electricity on domestic utility sector. The resultswere used to estimate the feasible extent of CO2 emission reduction through use of electricity as theenergy resources, vis-à-vis its economic viability through cost effectiveness. The analysis alsoprovides a platform for implementing CDM projects in the sector and related prospects withrespects to the Indian scenario.

  14. Implementing Biogas Technology Project in Malvar, Batangas, Philippines

    Directory of Open Access Journals (Sweden)

    Juvy G. Mojares

    2015-11-01

    Full Text Available This study sought to determine the environmental and social impacts of the biogas technology project of the municipal government of Malvar, Batangas, Philippines, through the Municipal Environment and Natural Resources Office. Document analysis and interview were employed in this study. Results showed that heat and electricity generation from biogas decreased dependency on electricity and fuel oil.In terms of social impacts, the biogas technology contributed to socio-economic improvement of the barangay in the form of job creation, technological and skills transfer through training in biogas production, contribution to continuous pursuing of energy neutrality and encouraged sustainability development at the community level. Aside from these, the technology was a source of organic fertilizer for the farming community of Malvar. It is recommended that commercial farms be strictly monitored and ordinances be imposed on them specifically on the use of biogas technology. The municipal government could partner with GOs and NGOs providing grant or equipment for such technology. For the monitoring of backyard farms, develop close coordination with barangay officials, if it does not work, plan a consultative meeting with agencies concerned to explain the hazards of improper disposal of hog wastes.

  15. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    Science.gov (United States)

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  16. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  17. Seismic microzoning projects and their implementation in Venezuela

    Science.gov (United States)

    Schmitz, M.; Cano, V.; Olbrich, F.; Vallee, M.; Morales, C.; Arreaza, A.; Mendes, K.; Klarica, S.; Alvarez Gomez, J.; Aray, J.; Vielma, J.; Pombo, A.; Diaz, J.; Grupo de trabajo

    2013-05-01

    Site effects have been recognized to play an important role in damage distribution of destructive earthquakes. These effects have been observed in Venezuela especially during the 1967 Caracas earthquake, when 4 buildings with 10 and more storeys during the Caracas 1967 earthquake collapsed, and a big number of them in the same deep sediment area have been seriously damaged. This motivated the development of studies regarding the subsurface configuration of Caracas and Barquisimeto during the last decade, with a seismic microzoning project realized in both cities from 2005 to 2009. The main results of this project were the development of design response spectra for the different microzones within the sedimentary basin, as well as estimates of landslide hazard. Implementation of the results in municipality ordinances is actually discussed with local authorities. They are aimed to address mitigation for new constructions by the application of the specific design spectra, for existing buildings via evaluation and retrofitting strategies, and for slope areas (informal, as well as formal developments) due to the identification of areas that may not be developed or require detailed studies of slope stabilities. Since then, seismic microzoning studies were started in Cumaná, Guarenas/Guatire and Lara state, and within a broader context of integrated risk management, which includes flooding, landslide and technological risks, in Mérida, Valencia, Maracay, Barcelona/Puerto La Cruz and Valle de la Pascua. The projects are coordinated by the Venezuelan Foundation for Seismological Research (FUNVISIS) in cooperation with local universities. Efforts are done to unable local researchers to apply the methodologies in other cities as Valera, Trujillo, Boconó, San Cristóbal and Tucacas. A unified seismic hazard map as input motion to these studies is actually in development. Depending on the local characteristics, building inventory and vulnerability analysis are done for risk

  18. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    Science.gov (United States)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  19. Socio-economic drivers in implementing bioenergy projects

    International Nuclear Information System (INIS)

    Domac, J.; Richards, K.; Risovic, S.

    2005-01-01

    Within the international community there is considerable interest in the socio-economic implications of moving society towards the more widespread use of renewable energy resources. Such change is seen to be very necessary but is often poorly communicated to people and communities who need to accept such changes. There are pockets of activity across the world looking at various approaches to understand this fundamental matter. Typically, socio-economic implications are measured in terms of economic indices, such as employment and monetary gains, but in effect the analysis relates to a number of aspects which include social, cultural, institutional, and environmental issues. The extremely complex nature of bioenergy, many different technologies involved and a number of different, associated aspects (socio-economics, greenhouse gas mitigation potential, environment, ?) make this whole topic a complex subject. This paper is primarily a descriptive research and review of literature on employment and other socio-economic aspects of bioenergy systems as drivers for implementing bioenergy projects. Due to the limited information, this paper does not provide absolute quantification on the multiplier effects of local and or national incomes of any particular country or region. The paper intends to trigger a more in-depth discussion of data gaps, potentials, opportunities and challenges. An encouraging trend is that in many countries policy makers are beginning to perceive the potential economic benefits of commercial biomass e.g. employment/earnings, regional economic gain, contribution to security of energy supply and all others

  20. Characterizing the impact of projected changes in climate and ...

    Science.gov (United States)

    The impact of climate change on human and environmental health is of critical concern. Population exposures to air pollutants both indoors and outdoors are influenced by a wide range of air quality, meteorological, behavioral, and housing-related factors, many of which are also impacted by climate change. An integrated methodology for modeling changes in human exposures to tropospheric ozone (O3) owing to potential future changes in climate and demographics was implemented by linking existing modeling tools for climate, weather, air quality, population distribution, and human exposure. Human exposure results from the Air Pollutants Exposure Model (APEX) for 12 US cities show differences in daily maximum 8-h (DM8H) exposure patterns and levels by sex, age, and city for all scenarios. When climate is held constant and population demographics are varied, minimal difference in O3 exposures is predicted even with the most extreme demographic change scenario. In contrast, when population is held constant, we see evidence of substantial changes in O3 exposure for the most extreme change in climate. Similarly, we see increases in the percentage of the population in each city with at least one O3 exposure exceedance above 60 p.p.b and 70 p.p.b thresholds for future changes in climate. For these climate and population scenarios, the impact of projected changes in climate and air quality on human exposure to O3 are much larger than the impacts of changing demographics.

  1. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    Science.gov (United States)

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  2. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  3. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  4. Yakima fisheries project. Revised draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (adaptive management); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery. Only minor differences in environmental consequences were found between Alternatives 1 and 2. Potentially high impacts on wild, native, and non-target fish populations under both alternatives would be mitigated through careful adherence to the adaptive management process outlined in the EIS

  5. Overcoming Barriers in the Implementation of Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-15

    One of the IAEA's statutory objectives is to ''seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world.'' One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish ''standards of safety for protection of health and minimization of danger to life and property''. The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The IAEA attaches great importance to the dissemination of information that can assist Member States with the development, implementation, maintenance and continuous improvement of systems, programmes and activities that support the nuclear fuel cycle and nuclear applications, including the legacy of past practices and accidents. The IAEA has initiated a comprehensive programme of work covering all aspects of environmental remediation: technical and non-technical factors, including costs, that influence environmental remediation strategies and pertinent decision making; site

  6. Overcoming Barriers in the Implementation of Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2013-01-01

    One of the IAEA's statutory objectives is to ''seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world.'' One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish ''standards of safety for protection of health and minimization of danger to life and property''. The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The IAEA attaches great importance to the dissemination of information that can assist Member States with the development, implementation, maintenance and continuous improvement of systems, programmes and activities that support the nuclear fuel cycle and nuclear applications, including the legacy of past practices and accidents. The IAEA has initiated a comprehensive programme of work covering all aspects of environmental remediation: technical and non-technical factors, including costs, that influence environmental remediation strategies and pertinent decision making; site

  7. Effective and efficient implementation of alternative project delivery : research summary.

    Science.gov (United States)

    2017-05-01

    Alternative project delivery (APD) methods such as Design Build (DB) and Construction Manager at Risk (CMAR), are used by state departments of transportation to improve the efficiency and effectiveness of project delivery. The Maryland Department of ...

  8. MARKETING STRATEGIES IN THE DEVELOPMENT AND IMPLEMENTATION OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-05-01

    Full Text Available The article is devoted to marketing in project management, as the scope of activities aimed at improving the quality characteristics of the project for its further effective market promotion in an increasingly competitive environment. Particular attention is paid to marketing strategies during the development and subsequent sale of the project to the investor. The problem of effective combination of marketing strategies and project management process is being solved.

  9. Implementing GEOSS Goals in Mesoamerica through the SERVIR Project

    Science.gov (United States)

    Hardin, D. M.; Graves, S.; Sever, T.; Irwin, D.

    2006-05-01

    On February 16, 2005 a ten-year plan for implementation of the Global Earth Observation System of Systems (GEOSS) was adopted by the European Commission and nearly 60 governments worldwide. The plan was the culmination of an effort initiated in 2002 when the World Summit on Sustainable Development highlighted the urgent need for coordinated observations relating to the state of the Earth. The plan defined nine societal benefit areas that could be addressed with a coordinated global observation system. Mesoamerica is a prime example of a multi-national region with natural and human induced stresses that can benefit from information provided by observation systems as defined by GEOSS. The region is severely threatened by extensive deforestation, illegal logging, water pollution, and uncontrolled slash and burn agriculture. Additionally, Mesoamerica's distinct geology and geography result in disproportionate vulnerability of its population to natural disasters such as earthquakes, hurricanes, drought, and volcanic eruptions. In Mesoamerica the SERVIR* project has achieved early success in many of the GEOSS societal benefit areas. Overcoming roadblocks to coordination and data sharing between countries, organizations and disciplines SERVIR is providing environmental monitoring and decision support products and applications that directly map to several GEOSS societal benefit areas. Mesoamerica is particularly prone to natural disasters. There are many instances such as Hurricane Mitch in 1998 that resulted in the death of thousands of people. As recently as 2005, natural disasters took the lives of 1,500 people when Hurricane Stan struck Guatemala, El Salvador, Mexico and Nicaragua. Within 48 hours of landfall data products were generated by the SERVIR team and SERVIR partners and made available via the SERVIR website to disaster response teams in Guatemala and El Salvador. In the true spirit of GEOSS, data from a variety of Earth observing satellites such as RADARSAT

  10. The implementation of sustainability principles in project management

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Debby Goedknegt

    2012-01-01

    It is becoming clear that the project management practice must embrace sustainability in order to develop into a 'true profession' (Silvius et al., 2012). In project management, sustainability can be gained in both the product of the project and in the process of delivering the product. (Gareis et

  11. 33 CFR 385.13 - Projects implemented under additional program authority.

    Science.gov (United States)

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  12. South Carolina: Charleston County Area Project Impact Environmental Education Program (A Former EPA CARE Project)

    Science.gov (United States)

    The Charleston County Area Project Impact is the recipient of a Level II CARE cooperative agreement. The project is under the direction of the Charleston County Building Services Department, in Charleston, S.C.

  13. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  14. Project implementation : classification of organic soils and classification of marls - training of INDOT personnel.

    Science.gov (United States)

    2012-09-01

    This is an implementation project for the research completed as part of the following projects: SPR3005 Classification of Organic Soils : and SPR3227 Classification of Marl Soils. The methods developed for the classification of both soi...

  15. Alcolocks : factors influencing implementation, participation and compliance : literature review contributed to the EU project Alcolock Implementation in the European Union.

    NARCIS (Netherlands)

    Mathijssen, M.P.M.

    2007-01-01

    In 2004-2005, a series of alcolock field trials were conducted in four European countries, in the framework of the EU research project Alcolock Implementation in the European Union. This project was granted by the European Commission, Directorate-General for Energy and Transport (DG-TREN). As part

  16. Implementation of an education development project in pathology to improve student competency-lessons learnt.

    Science.gov (United States)

    Negi, Gita; Harsh, Meena; Chauhan, Vijendra D; Kalra, Vinita; Agarwal, Pradeep; Kusum, Anuradha

    2015-08-01

    Basic medical sciences and clinical teachings are not coordinated in the present medical education system. They are not taught keeping in mind the outcomes required at the time of actual handling of patients in the community. An educational development project was implemented in the Department of Pathology with the aim that it will result in the student learning to link the pathophysiology of the disease to clinical scenarios and become fully competent for lifelong medical practice. The pathology teaching of the second professional batch was modified by starting with defining the desired outcomes/competencies in the student's knowledge, skills, and attitude which were then addressed by lectures, demonstrations, practical classes and small group activities where case scenarios and laboratory reports were included. The outcome was assessed by Objectively Structured Clinical/Practical Examination and multiple choice questions. Force field analysis, faculty and student interviews, and questionnaires were used to assess the factors affecting its implementation and impact. Totally 80 students of the 2(nd) Professional MBBS were exposed to a competency-based education development project. It was found that the system was appreciated by faculty and students, especially the integration with clinical scenarios. There were many factors which influenced the execution of this program, including motivation level of students and faculty, time, logistics and meticulous planning. There was a significant improvement in student's performance and satisfaction. Many factors including prior planning were a major determinant for the success of this education development project.

  17. Adapting the Consolidated Framework for Implementation Research to Create Organizational Readiness and Implementation Tools for Project ECHO.

    Science.gov (United States)

    Serhal, Eva; Arena, Amanda; Sockalingam, Sanjeev; Mohri, Linda; Crawford, Allison

    2018-03-01

    The Project Extension for Community Healthcare Outcomes (ECHO) model expands primary care provider (PCP) capacity to manage complex diseases by sharing knowledge, disseminating best practices, and building a community of practice. The model has expanded rapidly, with over 140 ECHO projects currently established globally. We have used validated implementation frameworks, such as Damschroder's (2009) Consolidated Framework for Implementation Research (CFIR) and Proctor's (2011) taxonomy of implementation outcomes, combined with implementation experience to (1) create a set of questions to assess organizational readiness and suitability of the ECHO model and (2) provide those who have determined ECHO is the correct model with a checklist to support successful implementation. A set of considerations was created, which adapted and consolidated CFIR constructs to create ECHO-specific organizational readiness questions, as well as a process guide for implementation. Each consideration was mapped onto Proctor's (2011) implementation outcomes, and questions relating to the constructs were developed and reviewed for clarity. The Preimplementation list included 20 questions; most questions fall within Proctor's (2001) implementation outcome domains of "Appropriateness" and "Acceptability." The Process Checklist is a 26-item checklist to help launch an ECHO project; items map onto the constructs of Planning, Engaging, Executing, Reflecting, and Evaluating. Given that fidelity to the ECHO model is associated with robust outcomes, effective implementation is critical. These tools will enable programs to work through key considerations to implement a successful Project ECHO. Next steps will include validation with a diverse sample of ECHO projects.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-No Derivatives License 4.0 (CCBY-NC-ND), where it is permissible to download and share the work provided it is properly cited

  18. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    Document available in extended abstract form only. The successful implementation of a repository programme relies on both the technical aspects of a sound safety strategy, and scientific and engineering excellence, as well as on social aspects such as public acceptance. Monitoring has the potential to contribute to both of these aspects and thus to play an important role as national radioactive waste disposal programmes move forward towards safe and accepted implementation of geological disposal. The main goal of the 'Monitoring Developments for Safe Repository Operation and staged Closure' (MoDeRn) Project is to take the state-of-the-art of broadly accepted, main monitoring objectives and to develop these to a level of description that is closer to the actual implementation of monitoring during the staged approach of the disposal process. It should be noted that the MoDeRn project recognizes the diversity of monitoring activities that will be required in a repository, in particular related to operational safety, nuclear safeguards and environmental impact assessment. The projects emphasis, however, is on monitoring conducted to verify expected repository system evolutions - i.e. evolutions of the natural environment and the engineered system - during a phase of progressive construction, operation and closure that may last on the order of a century. This serves the purpose of confirming and possibly enhancing the prior license basis for safety and pre-closure management options. Achieving this goal includes analysis of whether the implementation of a realistic monitoring programme is likely to address expert and lay stakeholder expectations (objectives), to provide an understanding of monitoring activities and available technologies that can be implemented in a repository context (feasibility), and to provide recommendations for related, future stakeholder engagement activities (social acceptance). These are carried out by the 18 project partners representing 12

  19. An evaluation of the total quality management implementation strategy for the advanced solid rocket motor project at NASA's Marshall Space Flight Center. M.S. Thesis - Tennessee Univ.

    Science.gov (United States)

    Schramm, Harry F.; Sullivan, Kenneth W.

    1991-01-01

    An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.

  20. Implementation of health impact assessment in Danish municipal context

    DEFF Research Database (Denmark)

    Kraemer, Stella R. J.; Nikolajsen, Louise Theilgaard; Gulis, Gabriel

    2014-01-01

    . Conclusions: Systematic and sustainable capacity building is needed to achieve high level implementation of HIA in Danish municipalities. Development of validated tools, most importantly screening tools with focus on priorities of national public health policy would enhance implementation on municipal level.......Aims: Implementation of Health Impact Assessment (HIA) in Danish municipalities has been analyzed using the Roger's Diffusion of Innovation Theory. Municipalities were chosen from among those who presented their health policies on websites according to the status of inclusion of HIA into health...... policy. Methods: Qualitative interviews were conducted in 6 municipalities (3 with HIA inducted in their health policy and 3 without it) gathering information on knowledge and attitudes to HIA, barriers to its implementation, social system and communication channels used or expected to be used...

  1. Social and Economic Impact of the Candle Light Source Project Candle project impact

    Science.gov (United States)

    Baghiryan, M.

    Social and economic progress related to the realization of the CANDLE synchrotron light source creation project in Armenia is discussed. CANDLE service is multidisciplinary and long-lasting. Its impacts include significant improvement in science capacities, education quality, industrial capabilities, investment climate, country image, international relations, health level, restraining the "brain-drain", new workplaces, etc. CANDLE will serve as a universal national infrastructure assuring Armenia as a country with knowledge-based economy, a place for doing high-tech business, and be a powerful tool in achieving the country's jump forward in general.

  2. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  3. Impact of National Fadama Development Project II on Rice farmers ...

    African Journals Online (AJOL)

    ... examined the impact of National Fadama Development Project II on the profitability of rice farmers and assessed the extent to which the various innovations disseminated by the project were adopted by the rice farmer beneficiaries. The project which had all operating expenses cofinanced by the various key stakeholders ...

  4. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Gilbert Gilbert Silvius; Jasper van den Brink

    2011-01-01

    Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management. Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of sustainability in

  5. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Jasper van den Brink; Gilbert Gilbert Silvius

    2012-01-01

    Full text via link Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of

  6. Evidence utilisation project: Management of inadvertent perioperative hypothermia. The challenges of implementing best practice recommendations in the perioperative environment.

    Science.gov (United States)

    Munday, Judy; Hines, Sonia Jane; Chang, Anne M

    2013-12-01

    The prevention of inadvertent perioperative hypothermia (IPH) remains an important issue in perioperative healthcare. The aims of this project were to: (i) assess current clinical practice in the management of IPH and (ii) promote best practice in the management of IPH in adult operating theatres. This project from August 2010 to March 2012 utilised a system of audit and feedback to implement best practice recommendations. Data were collected via chart audits against criteria developed from best practice recommendations for managing IPH. Evidence-based best practices, such as consistent temperature monitoring and patient warming, were implemented using multifaceted interventions. Perioperative records for 73 patients (baseline) and 72 patients (post-implementation) were audited. Post-implementation audit showed an increase in patients with temperatures >36°C admitted to the post-anaesthetic care unit (PACU) (8%) and discharged from PACU (28%). The percentage of patients receiving preoperative temperature monitoring increased (38%); however, low levels of intraoperative monitoring remained (31% of patients with surgery of 30 min or longer duration). Small increases were found in patient warming of 5% intraoperatively and 8% postoperatively. Preoperative warming was not successfully implemented during this phase of the project. Temperature monitoring, warming and rates of normothermia improved; however, barriers to best practice of IPH management were experienced, which negatively impacted on the project. Further stages of implementation and audit were added to further address IPH management in this department. © 2013 The Authors. International Journal of Evidence-Based Healthcare © 2013 The Joanna Briggs Institute.

  7. Governance of Higher Education--Implementation of Project Governance

    Science.gov (United States)

    Macheridis, Nikos

    2017-01-01

    This article focuses on coordination between governance actors in higher education. The object of the study is a department at a public university, seen as a multi-project environment. The purpose of this article is to illustrate and analyze project governance as a tool that allows departmental management to coordinate with the authorities, the…

  8. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    Science.gov (United States)

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  9. Aerosol cluster impact and break-up: model and implementation

    International Nuclear Information System (INIS)

    Lechman, Jeremy B.

    2010-01-01

    In this report a model for simulating aerosol cluster impact with rigid walls is presented. The model is based on JKR adhesion theory and is implemented as an enhancement to the granular (DEM) package within the LAMMPS code. The theory behind the model is outlined and preliminary results are shown. Modeling the interactions of small particles is relevant to a number of applications (e.g., soils, powders, colloidal suspensions, etc.). Modeling the behavior of aerosol particles during agglomeration and cluster dynamics upon impact with a wall is of particular interest. In this report we describe preliminary efforts to develop and implement physical models for aerosol particle interactions. Future work will consist of deploying these models to simulate aerosol cluster behavior upon impact with a rigid wall for the purpose of developing relationships for impact speed and probability of stick/bounce/break-up as well as to assess the distribution of cluster sizes if break-up occurs. These relationships will be developed consistent with the need for inputs into system-level codes. Section 2 gives background and details on the physical model as well as implementations issues. Section 3 presents some preliminary results which lead to discussion in Section 4 of future plans.

  10. Continued multidisciplinary project-based learning - implementation in health informatics.

    Science.gov (United States)

    Wessel, C; Spreckelsen, C

    2009-01-01

    Problem- and project-based learning are approved methods to train students, graduates and post-graduates in scientific and other professional skills. The students are trained on realistic scenarios in a broader context. For students specializing in health informatics we introduced continued multidisciplinary project-based learning (CM-PBL) at a department of medical informatics. The training approach addresses both students of medicine and students of computer science. The students are full members of an ongoing research project and develop a project-related application or module, or explore or evaluate a sub-project. Two teachers guide and review the students' work. The training on scientific work follows a workflow with defined milestones. The team acts as peer group. By participating in the research team's work the students are trained on professional skills. A research project on a web-based information system on hospitals built the scenario for the realistic context. The research team consisted of up to 14 active members at a time, who were scientists and students of computer science and medicine. The well communicated educational approach and team policy fostered the participation of the students. Formative assessment and evaluation showed a considerable improvement of the students' skills and a high participant satisfaction. Alternative education approaches such as project-based learning empower students to acquire scientific knowledge and professional skills, especially the ability of life-long learning, multidisciplinary team work and social responsibility.

  11. Ubiquitous-severance hospital project: implementation and results.

    Science.gov (United States)

    Chang, Bung-Chul; Kim, Nam-Hyun; Kim, Young-A; Kim, Jee Hea; Jung, Hae Kyung; Kang, Eun Hae; Kang, Hee Suk; Lee, Hyung Il; Kim, Yong Ook; Yoo, Sun Kook; Sunwoo, Ilnam; An, Seo Yong; Jeong, Hye Jeong

    2010-03-01

    The purpose of this study was to review an implementation of u-Severance information system with focus on electronic hospital records (EHR) and to suggest future improvements. Clinical Data Repository (CDR) of u-Severance involved implementing electronic medical records (EMR) as the basis of EHR and the management of individual health records. EHR were implemented with service enhancements extending to the clinical decision support system (CDSS) and expanding the knowledge base for research with a repository for clinical data and medical care information. The EMR system of Yonsei University Health Systems (YUHS) consists of HP integrity superdome servers using MS SQL as a database management system and MS Windows as its operating system. YUHS is a high-performing medical institution with regards to efficient management and customer satisfaction; however, after 5 years of implementation of u-Severance system, several limitations with regards to expandability and security have been identified.

  12. Implementing a Zero Energy Ready Home Multifamily Project

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation, Davis, CA (United States); German, Alea [Alliance for Residential Building Innovation, Davis, CA (United States)

    2015-08-01

    An objective of this project was to gain a highly visible foothold for residential buildings built to the U.S. Department of Energy's Zero Energy Ready Home (ZERH) specification that can be used to encourage participation by other California builders. This report briefly describes two single family homes that were ZERH-certified, and focuses on the experience of working with developer Mutual Housing on a 62 unit multi-family community at the Spring Lake subdivision in Woodland, CA. The Spring Lake project is expected to be the first ZERH certified multi-family project nationwide. This report discusses challenges encountered, lessons learned, and how obstacles were overcome.

  13. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  14. Implementation of health impact assessment in Danish municipal context.

    Science.gov (United States)

    Kraemer, Stella Rebecca Johnsdatter; Nikolajsen, Louise Theilgaard; Gulis, Gabriel

    2014-12-01

    Implementation of Health Impact Assessment (HIA) in Danish municipalities has been analyzed using the Roger's Diffusion of Innovation Theory. Municipalities were chosen from among those who presented their health policies on websites according to the status of inclusion of HIA into health policy. Qualitative interviews were conducted in 6 municipalities (3 with HIA inducted in their health policy and 3 without it) gathering information on knowledge and attitudes to HIA, barriers to its implementation, social system and communication channels used or expected to be used for implementation of HIA. No significant differences were found among analyzed municipalities by status of HIA inclusion into health policy. Among barriers; a lack of tools with general validity, a lack of intersectoral working culture, balance between centralized versus participatory way of working and organizational structure of a municipality, and a lack of capacities were enlisted as most relevant. The last one is a crucial factor of an internal social system of a municipality. With regards to communication channels, reporting and presentation skills of implementers and doers are of key importance. Systematic and sustainable capacity building is needed to achieve high level implementation of HIA in Danish municipalities. Development of validated tools, most importantly screening tools with focus on priorities of national public health policy would enhance implementation on municipal level.

  15. Optimising Impact in Astronomy for Development Projects

    Science.gov (United States)

    Grant, Eli

    2015-08-01

    Positive outcomes in the fields of science education and international development are notoriously difficult to achieve. Among the challenges facing projects that use astronomy to improve education and socio-economic development is how to optimise project design in order to achieve the greatest possible benefits. Over the past century, medical scientists along with statisticians and economists have progressed an increasingly sophisticated and scientific approach to designing, testing and improving social intervention and public health education strategies. This talk offers a brief review of the history and current state of `intervention science'. A similar framework is then proposed for astronomy outreach and education projects, with applied examples given of how existing evidence can be used to inform project design, predict and estimate cost-effectiveness, minimise the risk of unintended negative consequences and increase the likelihood of target outcomes being achieved.

  16. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects, National Research Council

    2007-01-01

    .... Although the use of wind energy to generate electricity is increasing rapidly in the United States, government guidance to help communities and developers evaluate and plan proposed wind-energy projects is lacking...

  17. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  18. Towards implementing climate services in Peru – The project CLIMANDES

    Directory of Open Access Journals (Sweden)

    G. Rosas

    2016-12-01

    The efforts accomplished within CLIMANDES improved the quality of the climate services provided by SENAMHI. The project hence contributed successfully to higher awareness and higher confidence in the climate information by SENAMHI.

  19. Bottlenecks in Software Defect Prediction Implementation in Industrial Projects

    OpenAIRE

    Hryszko Jarosław; Madeyski Lech

    2015-01-01

    Case studies focused on software defect prediction in real, industrial software development projects are extremely rare. We report on dedicated R&D project established in cooperation between Wroclaw University of Technology and one of the leading automotive software development companies to research possibilities of introduction of software defect prediction using an open source, extensible software measurement and defect prediction framework called DePress (Defect Prediction in Software Syst...

  20. D6.4 Implementation: Project Knowledge Management

    DEFF Research Database (Denmark)

    Dolog, Peter; Durao, Frederico; Jahn, Karsten

    2009-01-01

    This report presents the prototype for the project knowledge management in Logica. We describe the related theories and our approach, the ‘circle of knowledge’. According to our analysis it results in the data-based import or update process between two specialized applications, one for project...... management and one for knowledge sharing. We describe the applications involved and the features used. The main component here is a templating mechanism in the KiWi system....

  1. Pilot project for implementing corporate governance of IT

    OpenAIRE

    Fernández Martínez, Antonio; Gumbau Mezquita, José Pascual; Llorens Largo, Faraón

    2012-01-01

    This article presents the results of the IT Governance Enhancement Project (ITGEP) carried out in three Spanish universities (the University of Murcia, Jaume I University and the Polytechnic University of Cartagena) on the initiative of the IT Commission of the Spanish Association of University Rectors (CRUE). The aim of the project was to apply the reference framework of Governance of IT for Universities (GTI4U) in order to determine the best practices currently carried out in the three univ...

  2. Defining and implementing a model for pharmacy resident research projects

    Directory of Open Access Journals (Sweden)

    Dick TB

    2015-09-01

    Full Text Available Objective: To describe a standard approach to provide a support structure for pharmacy resident research that emphasizes self-identification of a residency research project. Methods: A subcommittee of the residency advisory committee was formed at our institution. The committee was initially comprised of 2 clinical pharmacy specialists, 1 drug information pharmacist, and 2 pharmacy administrators. The committee developed research guidelines that are distributed to residents prior to the residency start that detail the research process, important deadlines, and available resources. Instructions for institutional review board (IRB training and deadlines for various assignments and presentations throughout the residency year are clearly defined. Residents conceive their own research project and emphasis is placed on completing assignments early in the residency year. Results: In the 4 years this research process has been in place, 15 of 16 (94% residents successfully identified their own research question. All 15 residents submitted a complete research protocol to the IRB by the August deadline. Four residents have presented the results of their research at multi-disciplinary national professional meetings and 1 has published a manuscript. Feedback from outgoing residents has been positive overall and their perceptions of their research projects and the process are positive. Conclusion: Pharmacy residents selecting their own research projects for their residency year is a feasible alternative to assigning or providing lists of research projects from which to select a project.

  3. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  4. MANAGEMENT OF A COMPANY’S ECONOMIC SUSTAINABILITY IN THE PROCESS OF INNOVATIVE PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Juliana M. Sulejmanova

    2013-01-01

    Full Text Available The article is devoted to management of a company’s sustainability in the process of innovative projects implementation. The author suggests using dynamic index named aggregated index of a company’s economic stability. Criteria of choosing innovative projects to be implemented are worked out. These criteria add traditional estimation and take into account changing company’s economic stability at every stage of project lifecycle.

  5. Personalized Training in Romanian SME’s ERP Implementation Projects

    Directory of Open Access Journals (Sweden)

    Iuliana DOROBAT

    2010-01-01

    Full Text Available Many practitioners and IS researchers have stated that the overwhelming majority of Enter-prise Resource Planning (ERP systems implementations exceed their training budget and their time allocations. In consequence many Romanian SMEs that implement an ERP system are looking to new approaches of knowledge transfer and performance support that are better aligned with business goals, deliver measurable results and are cost effective. Thus, we have begun to analyze the training methods used in ERP implementation in order to provide a so-lution that could help us maximize the efficiency of an ERP training program. We proposed a framework of an ERPTraining module that can be integrated with a Romanian ERP system and which provides a training management that is more personalized, effective and less ex-pensive.

  6. Draft environmental impact statement. Bison basin project, Fremont County, Wyoming

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Construction and operation of leach uranium mine and recovery plant designed to produce one million lb of U 3 O 8 per year at a rate not to exceed 400,000 lb/y in Fremont County, Wyoming are proposed. The project site would consist of 761 acres lying 50 miles south of Riverton and 30 miles southwest of Jeffery City. The in situ leach process, implemented to mine ore contained in the Laney member of the Green River formation, would involve use of sodium carbonate-bicarbonate solution and an oxidizing agent injected and recovered through a complex of well patterns. Each well pattern would consist of six injection wells surrounding a central production well. Only about 40 acres would be mined, while another 13.5 acres would be excavated for equipment foundations and evaporation ponds. Recycling of mined formation water through a reverse osmosis cleanup system and placing it back into the formation after mining was complete would restore the groundwater system to its former potential. Solid wastes produced by the mining process would be removed to a licensed disposal site. Positive Impacts: Uranium ore produced by the mine and refined by the plant would aid in meeting demand for this resource which is estimated to double to a level of 15,000 tons per year within the next 5 years and to reach 45,000-50,000 tons per year by 1990. Some monetary benefits would accrue to local communities due to local expenditures resulting from construction and operation. Negative Impacts: Project activities would result in displacement of livestock grazing practices from 57 acres of land. Some local deterioration of groundwater quality would be expected, and approximately 240 acre-feet of groundwater would be removed from the aquifer permanently. Radon-222 and other small radioactive emissions would result from the solution mining process

  7. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  8. Implementation of NUREG 1318 guidance within the Yucca Mountain Project

    International Nuclear Information System (INIS)

    La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

    1990-01-01

    This paper discusses the implementation of a quality assurance program that fulfills the requirements of the U.S. Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements for the identification of items and activities important to public radiological safety and waste isolation for placement on a Q-List and Quality Activities List and also for graded application of QA measures. The process and organization for implementing this guidance is discussed

  9. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  10. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  11. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  12. Measuring Systemic Impacts of Bike Infrastructure Projects

    Science.gov (United States)

    2018-05-01

    This paper qualitatively identifies the impacts of bicycle infrastructure on all roadway users, including safety, operations, and travel route choice. Bicycle infrastructure includes shared lanes, conventional bike lanes, and separated bike lanes. Th...

  13. Climate Change in Environmental Impact Assessment of Renewable Energy Projects

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen

    2012-01-01

    Many renewable energy projects are subject to EIA. However a question that surfaces is what use an impact assessment is when the project is ‘good for the environment’? One of the current topics receiving much attention in impact assessment is climate change and how this factor is integrated...... in impact assessments. This warrants the question: How do we assess the climate change related impacts of a project that inherently has a positive effect on climate? This paper is based on a document study of EIA reports from Denmark. The results show that climate change is included in most of the EIA...... reports reviewed, and that only climate change mitigation is in focus while adaptation is absent. Also the results point to focus on positive impacts, while the indirect negative impacts are less apparent. This leads to a discussion of the results in the light of the purpose of EIA....

  14. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  15. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  16. Analysis of the Status and Impacts of NCTR Projects

    Science.gov (United States)

    2012-08-01

    The National Center for Transit Research (NCTR) at the University of South Florida (USF) assessed the implementation status and identified the outcomes and impacts of the results of 30 Florida Department of Transportation -sponsored NCTR research pro...

  17. Principal results of 'DEWAM' project implementation, Russian Federation

    International Nuclear Information System (INIS)

    Nechaev, A.F.

    2002-01-01

    This overview summarizes the key results of the four-year project 'Decontamination and Waste Management in the Course of Research Reactors Decommissioning' carried out within the framework of the IAEA's CRP 'Decommissioning Techniques for Research Reactors'. The project included two principal components: (1) info-analytical studies and development of a database system, and (2) research and development in the areas of decontamination and waste management technologies applicable to decommissioning. Details of the work are expounded in 29 publications and annual Progress Reports; the results of the study are used in corresponding university courses; and innovative technologies for radwaste processing and environmental restoration are planned to be introduced into practice. (author)

  18. GASB's New Financial Reporting Model: Implementation Project for School Districts.

    Science.gov (United States)

    Bean, David; Glick, Paul

    1999-01-01

    In June 1999, the Governmental Accounting Standards Board (GASB) issued its statement on the structure of the basic financial reporting model for state and local governments. Explains the new financial reporting model and reviews the implementation issues that school districts will need to address. (MLF)

  19. Project W-320, WRSS PCP: Procedure implementation verification

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the methodology for the safe retrieval of high-heat waste from Tank 241-C-106 as specified in the WRSS Process Control Plan HNF-SD-PCP-013, Revision 1, has been adequately implemented into the Tank Waste Remediation System (TWRS) operational procedures. Tank 241-C-106 is listed on the High Heat Load Watch List

  20. Implementing Problem Based Learning through Engineers without Borders Student Projects

    Science.gov (United States)

    Wittig, Ann

    2013-01-01

    Engineers Without Borders USA (EWB) is a nonprofit organization that partners student chapters with communities in fundamental need of potable water, clean air, sanitation, irrigation, energy, basic structures for schools and clinics, roads and bridges, etc. While EWB projects may vary in complexity, they are all realistic, ill-structured and…

  1. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  2. Employment impacts of CDM projects in China's power sector

    International Nuclear Information System (INIS)

    Wang, Can; Zhang, Weishi; Cai, Wenjia; Xie, Xi

    2013-01-01

    There are continuous debates around the question of whether CDM really contributes to sustainable development (SD) in host countries. Employment impact is an essential indicator of SD. Based on an input-out approach this research builds a quantitative assessment model to evaluate the employment impacts of CDM. Both direct and indirect jobs creation and job losses of CDM projects in the power sector registered by the end of 2011 are calculated by project types and power grids where the project is located. Results of this study show that, although the above mentioned CDM projects causes about 99,000 net direct job losses, they also create about 3.08 million indirect jobs, resulting in the gross employment of CDM to be about 2.98 million. Thereof, hydro projects induce both direct and indirect job losses, which comes to approximately 0.89 million. Solar projects have the most potential since they own the highest indirect jobs created by one GWh generation, about 104 jobs/GWh. - Highlights: • An input–output model was built for assessment of CDM projects' employment impact; • CDM projects create direct and indirect jobs while cause some losses in short. • Significant indirect job gains of CDM projects were found; • Solar projects cause 104 jobs/GWh in average, ranking as the highest contributor

  3. Impact of a quality improvement project to strengthen infection ...

    African Journals Online (AJOL)

    Impact of a quality improvement project to strengthen infection prevention and control training at rural healthcare facilities. ... African Journal of Health Professions Education. Journal Home · ABOUT THIS JOURNAL · Advanced Search ...

  4. Impact of promoting sustainable agriculture project on livelihood ...

    African Journals Online (AJOL)

    This study on impact assessment of Promoting Sustainable Agriculture Project ... the Fisher Index, Focused Group Discussion and descriptive statistical analysis. ... The qualitative analysis showed that 30%, 45% and 10% of men, women and ...

  5. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  6. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  7. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  8. Employee impact and attitude analysis for GHS implementation in Taiwan.

    Science.gov (United States)

    Chang, Yi-Kuo; Su, Teh-Sheng; Ouyang, Yun; Tseng, Jo-Ming

    2013-01-01

    The employee impact and attitude analysis for GHS implementation in Taiwan was investigated in this study. An impact assessment on the new regulations or changes in regulations for government, potential costs, benefits, and the global trade in chemicals to industries and hazard communication program for workers was studied by the methods of the questionnaire design and Delphi expert method. A survey was conducted using questionnaires and taking 200 experts from government's expert database and 500 selected respondents from case company. Results from present study revealed that the barrier associated with GHS implementation is existed; it is feasible to overcome. Both experts and employees think that business entities are insufficient to test and classify chemicals on their own, and the technical guidance from the government is needed. Data analyzed by the logistic regression revealed that more hours an employee spends on education and trainings of new GHS systems; the employee thinks implementation of GHS will improve hazard awareness for transporters. The weak labeling ability affects deployment of the new GHS system.

  9. Implementing a Zero Energy Ready Home Multifamily Project

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [National Renewable Energy Laboratory (NREL), Golden, CO (United States); German, Alea [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-08-17

    Building cost-effective, high-performance homes that provide superior comfort, health, and durability is the goal of the U.S. Department of Energy’s (DOE’s) Zero Energy Ready Home (ZERH) program. Building America research and other innovative programs throughout the country have addressed many of the technical challenges of building to the ZERH standard. The cost-effectiveness of measure packages that result in 30% source energy savings compared to a code-compliant home have been demonstrated. However, additional challenges remain, particularly with respect to convincing production builders of the strong business case for ZERH. The Alliance for Residential Building Innovation (ARBI) team believes that the keys to successfully engaging builders and developers in the California market are to help them leverage development agreement requirements, code compliance requirements, incentives, and competitive market advantages of ZERH certification, and navigate through this process. A primary objective of this project was to gain a highly visible foothold for residential buildings that are built to the DOE ZERH specification that can be used to encourage participation by other California builders. This report briefly describes two single-family homes that were ZERH certified and focuses on the experience of working with developer Mutual Housing on a 62-unit multifamily community at the Spring Lake subdivision in Woodland, California. The Spring Lake project is expected to be the first ZERH-certified multifamily project in the country. This report discusses the challenges encountered, lessons learned, and how obstacles were overcome.

  10. Joint implementation initiatives in South Africa: A case study of two energy-efficiency projects

    Energy Technology Data Exchange (ETDEWEB)

    Van Horen, C.; Simmonds, G.; Parker, G.

    1998-11-01

    This paper explores the issues pertinent to Joint Implementation (JI) in South Africa by examining two prototype potential projects on energy efficiency with the potential for reducing greenhouse gas (GHG) emissions. The first is an energy-efficient lighting project based on the public electricity utility, Eskom's plan for a compact fluorescent lighting program in the residential sector. The analysis indicates that the CFL program could avoid emissions of up to 243 thousand tons of carbon over the first five years, at negative cost (that is, with a positive economic return). The second project involves the delivery of passive solar, energy-efficient housing to a low-income township in the Western Cape Province, at an incremental capital cost of approximately $2.5m for the 6000 houses. In this case, the avoided GHG emissions over the first five years amount to between 14 and 20 tons of carbon, and over the 50 year life-span of the project it will result to 140 to 200 thousand tons of avoided emissions at a cost of $13 to $17 per ton. The housing project has significant non-GHG benefits such as savings on energy bills and health, which accrue to the low-income dwellers. A number of important JI-specific issues and concerns emerge with respect to the two projects, which can also be applied to other potential JI opportunities in the country generally. These include the issues of carbon credit sharing, for which a number of scenarios are suggested, as well as estimating unknown macroeconomic impacts, such as the effects of CFLs on the country's incandescent lighting industry. Findings from an examination of both potential projects conclude that capacity-building within the country is critical to ensure that the technology being transferred balances efficiency, cost and quality appropriate to the South African context. Finally, assessment and evaluation, monitoring and verification criteria and institutions are called for to guarantee measurable long

  11. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  12. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    2009-12-01

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  13. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  14. West Valley demonstration project: Implementation of the kerosene mitigation plan

    International Nuclear Information System (INIS)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab

  15. Engineering estimates versus impact evaluation of energy efficiency projects: Regression discontinuity evidence from a case study

    International Nuclear Information System (INIS)

    Lang, Corey; Siler, Matthew

    2013-01-01

    Energy efficiency upgrades have been gaining widespread attention across global channels as a cost-effective approach to addressing energy challenges. The cost-effectiveness of these projects is generally predicted using engineering estimates pre-implementation, often with little ex post analysis of project success. In this paper, for a suite of energy efficiency projects, we directly compare ex ante engineering estimates of energy savings to ex post econometric estimates that use 15-min interval, building-level energy consumption data. In contrast to most prior literature, our econometric results confirm the engineering estimates, even suggesting the engineering estimates were too modest. Further, we find heterogeneous efficiency impacts by time of day, suggesting select efficiency projects can be useful in reducing peak load. - Highlights: • Regression discontinuity used to estimate energy savings from efficiency projects. • Ex post econometric estimates validate ex ante engineering estimates of energy savings. • Select efficiency projects shown to reduce peak load

  16. Conditions, factors and criteria for successful project implementation: generalization of experience of project management

    Directory of Open Access Journals (Sweden)

    Feraru Galina Sergeevna

    2014-11-01

    Full Text Available The article addresses issues characterizing features of project management contributing to their competitive advantage; shows the factors and criteria of success of projects and the main reasons for their failures, making the failed efforts of developers to create projects.

  17. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  18. Implementation of technical stage of ITER project in Kazakstan

    International Nuclear Information System (INIS)

    Shkol'nik, V.S.; Shemanskij, V.A.; Cherepnin, Yu.S.; Skoz, E.Ya.; Nazarenko, L.I.; Shestakov, V.P.; Tazhibaeva, I.L.

    1996-01-01

    The main executors of ITER project in Kazakstan are: National nuclear Centre; National Joint-stock Co. of the enterprises on atomic engineering and industry (KATEP) and Science and Research Inst. of Experimental and Theoretical Physics of the Kazakh National Univ. Principle directions of Kazakhstan Republic works in 1996/97 under the ITER project is possible to formulate as follows: - irradiation test of materials on the BN-350 reactor; -continuation of in-pile experiments on determination of deuterium interaction parameters with beryllium samples, manufactured by Ulba Metallurgical Plant (KATEP), using Research Water Heterogeneous Reactor; - conducting of in-pile experiments on determination of hydrogen isotope permeation parameters through vanadium alloys using Research Water Heterogeneous Reactor. Conducting of out-pile experiments with beryllium, and vanadium alloys; - investigation of beryllium structure and properties in respect to hydrogen in condition, simulating gas impurities inventory, under thermal and neutron influence; -simulation of plasma disruption on divertor; -simulation of water steam interaction with beryllium; - determination of hydrogen permeation parameters for various materials with 'in situ' surface by electronic spectroscopy; -development of manufacturing technology of beryllium connections with copper alloys

  19. Impact of Stakeholder Psychological Empowerment on Project Success

    Directory of Open Access Journals (Sweden)

    Herry Pintardi Chandra

    2011-05-01

    Full Text Available The relationship between psychological empowerment of stakeholders and project success is an important thing that must be known by project manager. This research developed and tested the model to predict how well the impact of stakeholder psychological empowerment on project success. Stakeholder psychological empowerment was defined to have five indicator variables covering intrinsic motivation, opportunity to perform, ability to perform, task behaviors, and contextual behaviors. Meanwhile, project success can be measured by cost performance, time performance, quality performance, profitability, and customer satisfaction. In this study, it was hypothesized that stakeholder psychological empowerment influenced project success. Based on the data obtained from a questionnaire survey carried out to 204 respondents, structural equation modeling (SEM was used for predicting the performance of project success. It was found that stakeholder psychological empowerment influenced project success, especially on the ability to perform of stakeholders.

  20. Bill project for a new organisation of the electricity market (NOME): impact study

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports a study of the impact of the implementation of regulated access to electricity, of a capacity obligation, and of the evolution of regulated selling prices. It outlines that the progressive opening to concurrence of electricity in European markets did not reach in France the expected objectives: to let consumers get the benefit of investment in nuclear energy, incentives for innovation and demand reduction, promotion of investments within the frame of the electricity European market, etc. The authors describe the electricity market new organisation which is defined in the bill project, and the expected impacts on the different actors, macro-economical impacts, impacts on public finance and employment, environmental impacts, social impacts, and legal impacts

  1. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  2. The Conception of the Information Management of Innovation Project and the Stages of its Implementation

    Directory of Open Access Journals (Sweden)

    Babinska Solomiia Ya.

    2017-01-01

    Full Text Available The informational support plays an important role in the development and implementation of innovative projects, is a prerequisite for development of its conception. Proceeding from this, the article considers approaches of scientists to components of the life cycle of innovation project, revealing that the most of them would allocate three phases (development, implementation, and completion. In terms of the information support for each of these stages were defined objectives, tasks, managerial decisions (selecting of an innovation object; choosing the economy sector; identifying sources of financing; costing; substantiating expediency as to implementing a project; choosing counter-parties; product pricing; selecting markets; further use of the property objects, information arrays, necessary sources of information, it was considered how the conception of information management of innovation project is being implemented in stages.

  3. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  4. Implementation of a project-based engineering school: increasing student motivation and relevant learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-11-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the contents and competencies of several courses. This paper presents the academic context under which this experience has been implemented, and a summary of the work done to design and implement the Project-Based Engineering School at the UEM. The steps followed, the structure used, some sample projects, as well as the difficulties and benefits of implementing the programme are discussed in this paper. The results are encouraging as students are more motivated and the initial set objectives were accomplished.

  5. Classroom Environment in the Implementation of an Innovative Curriculum Project in Science Education.

    Science.gov (United States)

    Suarez, Mercedes; Pias, Rosa; Membiela, Pedro; Dapia, Dolores

    1998-01-01

    Analyzes the perceptions of students, teachers, and external observers in order to study the influence of classroom environment on the implementation of an innovative project in science education. Contains 33 references. (DDR)

  6. State and Federal project development procedures for bus rapid transit : managing differences and reducing implementation delays

    Science.gov (United States)

    2011-08-01

    This report documents an investigation into the transportation project development process in the : context of the implementation of bus rapid transit systems on the State Highway System as well as such : systems being part of the Federal New Starts ...

  7. Measurements and controls implementation for the WEST project

    International Nuclear Information System (INIS)

    Daniel, Raju; Bhandarkar, Manisha; Moreau, P.

    2015-01-01

    This paper provides an overview of the diagnostics implemented on WEST and gives more details on the infra-red system which is one of the main systems used to analyze the heat loads and ensure the machine protection. The modification of the CODAC and communications networks is also discussed. The new functionalities and architecture of the WEST PCS are detailed; especially it ensures the orchestration of many subsystems such as diagnostics, actuators and allows handling asynchronous off-normal events during the plasma discharge. In correlation the plasma discharge is now seen as a set of elementary pieces (called segments) joints together. Development of new plasma controllers will be addressed. An overview of the first wall monitoring activity and development is provided. Finally preparing the plasma restart requires control oriented modelling and simulations devoted to the control of the plasma shape will be presented

  8. Some aspects concerning the implementation of a fuel technology project

    International Nuclear Information System (INIS)

    Andreescu, N.; Alecu, M.; Mirion, I.

    1977-01-01

    The nuclear power programme in Romania envisages that until 1990 there will be installed about 6000 MWe in nuclear power plants. In order to put into practice such a nuclear programme there will be necessary high investments, possible to be achieved only by the ever increasing participation of the Romanian industry. With a view to this purpose, the Romanian authorities pay great attention to the research and development of the nuclear fuel manufacturing technology. Some research started in 1968-1969 and was intensified later in 1971 when the Institute for Nuclear Technology was founded and in 1972 when the IAEA-UNDP programme ''Development of Nuclear Technology in Romania'' started. This programme was conceived to deal with; 1. technology of UO2 powder and pellet fabrication; 2. manufacturing technology of fuel rods and bundle; 3. irradiation test of fuel rods; 4. development of various activities connected to fuel technology (thermal transfer loops, corrosion tests, neutronic, thermal and hydrodynamical calculations). Within the IAEA-UNDP project a demonstration facility was installed at INT where a great number of the works, resulting from the above mentioned directions, were performed. As a result of these works, at the end of 1975 in the demonstration facility there were manufactured in a reproducible way fuel rods according to the required specifications. The paper further presents the adopted irradiation testing programme, the out-of-pile testing programme, as well as some performances obtained during the different phases of the whole project. There have been conceived and manufactured some equipment meant for fabrication, tests, or for current control. The paper also shows some aspects connected to the personnel formation, as well as some aspects that will have to be solved in order to make possible the step from the demonstration facility to a fuel plant

  9. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  10. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  11. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  12. Social Impact Assessment : Guidance for assessing and managing the social impacts of projects

    NARCIS (Netherlands)

    Vanclay, Francis; Esteves, Ana Maria; Aucamp, Ilse; Franks, Daniel

    2015-01-01

    The purpose of this Guidance Note is to provide advice to various stakeholders about what is expected in good practice social impact assessment (SIA) and social impact management processes, especially in relation to project development. Project development refers to dams, mines, oil and gas

  13. Exploring the Effects of Technology Overload on the Outcomes of Enterprise Resource Planning (ERP) Implementation Projects

    Science.gov (United States)

    Kates, Earl B.

    2016-01-01

    Despite significant investments made by organizations to implement ERP systems and prior research that explored contributing factors of ERP failure, the ERP implementation success rate continues to remain low in practice. Increased technology usage in the workplace coupled with higher dependency on technology to complete project tasks often leads…

  14. Implementation through Innovation: A Literature-Based Analysis of the Tuning Project

    Science.gov (United States)

    Pálvölgyi, Krisztián

    2017-01-01

    Tuning Educational Structures in Europe is perhaps the most important higher education innovation platform nowadays. The main objective of the Tuning Project is to develop a tangible approach to implement the action lines of the Bologna Process; thus, implementation and innovation are closely linked in Tuning. However, during its development,…

  15. Project and implementation of the human/system interface laboratory

    International Nuclear Information System (INIS)

    Carvalho, Paulo Victor R. de; Obadia, Isaac Jose; Vidal, Mario Cesar Rodriguez

    2002-01-01

    Analog instrumentation is being increasingly replaced by digital technology in new nuclear power plants, such as Angra III, as well as in existing operating plants, such as Angra I and II, for modernization and life-extension projects. In this new technological environment human factors issues aims to minimize failures in nuclear power plants operation due to human error. It is well known that 30% to 50% of the detected unforeseen problems involve human errors. Presently, human factors issues must be considered during the development of advanced human-system interfaces for the plant. IAEA has considered the importance of those issues and has published TECDOC's and Safety Series Issues on the matter. Thus, there is a need to develop methods and criteria to asses, compare, optimize and validate the human-system interface associated with totally new or hybrid control rooms. Also, the use of computer based operator aids is en evolving area. In order to assist on the development of methods and criteria and to evaluate the effects of the new design concepts and computerized support systems on operator performance, research simulators with advanced control rooms technology, such the IEN's Human System Interface Laboratory, will provide the necessary setting. (author)

  16. Storytelling Practices in Project Management : Exploratory study in new business process implementation in Information and Communication Technology projects

    OpenAIRE

    Abdubaliev, Ulukbek; Akysheva, Aizhan

    2017-01-01

    Stories have always been present in the life of people as a part of their culture, it is a rather ancient narrative technique. The message delivered in a form of a story is specifically appealing to listeners, which makes it a powerful communication tool. The thesis explores storytelling practices in project management by answering the question: “How project managers use storytelling in new business process implementation in ICT projects?” The choice of the topic was driven by the gap in the ...

  17. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  18. Improving Science Attitude and Creative Thinking through Science Education Project: A Design, Implementation and Assessment

    Science.gov (United States)

    Sener, Nilay; Türk, Cumhur; Tas, Erol

    2015-01-01

    The purpose of this study is to examine the effects of a science education project implemented in different learning environments on secondary school students' creative thinking skills and their attitudes to science lesson. Within this scope, a total of 50 students who participated in the nature education project in Samsun City in 2014 make up the…

  19. From Project Management Capabilities to ERP Implementation Success: The Mediating Effect of IT Executives' Capabilities

    Science.gov (United States)

    Touir, Maatallah

    2016-01-01

    Enterprise resource planning project implementation success is necessary for organizations to enhance productivity and achieve operational efficiency; however, the failure rates of ERP projects remain high, ranging between 10% and 90%, and costing organizations $500,000 to $300 million. The problem addressed in this study was the low success rate…

  20. Implementation of a Project-Based Engineering School: Increasing Student Motivation and Relevant Learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-01-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the…

  1. Implementing care programmes for frail older people: A project management perspective

    NARCIS (Netherlands)

    Bindels, J.; Cox, K.; Abma, T.A.; van Schayck, O.C.P.; Widdershoven, G.

    2015-01-01

    Objective: To examine the issues that influenced the implementation of programmes designed to identify and support frail older people in the community in the Netherlands. Methods: Qualitative research methods were used to investigate the perspectives of project leaders, project members and members

  2. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  3. System implementation: managing project and post project stage - case study in an Indonesian company

    NARCIS (Netherlands)

    Govindaraju, Rajesri; de Bruijn, E.J.; Fisscher, O.A.M.; Laptaned, U

    2007-01-01

    The research reported in this paper aims to get a better understanding of how the implementation process of enterprise systems (ES) can be managed, by studying the process from an organisational perspective. A review of the literature on previous research in ES implementation has been carried out

  4. Innovative Startup-Projects: Experience, Evaluation, Implementation Contradictions

    Directory of Open Access Journals (Sweden)

    Inshakov Maksim Olegovich

    2015-09-01

    Full Text Available Innovative companies in the conditions of global post-crisis economic recovery and increased economic activity become again a promising area for investments of large investment and venture capital funds, venture divisions of large transnational corporations, business angels and other private investors. This is confirmed by the data on the increase in the volume of venture capital market in the US and Europe and on a significant increase in the cost of the leading foreign and Russian start-up companies which are rated as of 2014 in the present article. The comparative analysis of the leading Russian and foreign start-ups showed the prevalence of companies engaged in the field of IT-Internet-Mobile and focused on the provision of various kinds of innovative services to consumers among the foreign participants of the rating. Among Russian startups-winners the companies of technological orientation (biological, medical, and “clean” technologies dominate. They reflect the increasing importance of start-ups in the innovative development of the Russian economy. Participation in such competitions and ratings is a favorable factor of promoting start-ups, increasing awareness of potential investors and consumers of start-up products. The importance of start-ups formation and the development of effective regional and national innovation systems update the studies related to the identification of the fundamental contradictions in the activities of Russian start-ups and to the development of recommendations for their resolution. The article identifies the key issues of economic, organizational, informational and marketing character causing the collapse of start-up projects in the Russian economy in modern conditions.

  5. Features of conflict sensitivity implementation mechanisms’ in the public sector projects

    Directory of Open Access Journals (Sweden)

    T. V. Маматоvа

    2017-08-01

    Full Text Available It has been found in the study that potential conflicts are natural for public sector projects. Among the factors, that predetermine it, one can distinguish the following: the opposite to the processes of making changes; competition of participants during the allocation of project resources; different opportunities to access the project product; insufficient consideration of interested parties’ interests; context conflicts; directing the project to resolve the conflict in the territory; unsuccessful selection of the project team. Consequently, the article deals with the issues related to the definition of the peculiarities of the «conflict sensitivity» implementation mechanisms in the public sector projects. This topic has not been studied thoroughly in the specialized publications on public administration in Ukraine. Definitions of main related categories of the «conflict sensitivity» domain based on Conflict Sensitivity Consortium guidelines have been described in the study: «conflict sensitivity», «conflict», «conflict analysis», «conflict sensitivity analysis». The main ideas on the peculiarities of conflict-sensitive project / program management implementation mechanisms in the context of ensuring the success of local development projects by the integration of «conflict sensitivity» into all three phases of the project cycle, under which the intervention is implemented, are as follows: conflict-sensitive planning; conflict-sensitive implementation; conflict-sensitive monitoring and evaluation. The example of the conflict-sensitive project management use is: EUNPACK international project «Good intentions, mixed results – A conflict sensitive understanding of the EU comprehensive approach to conflict and crisis mechanisms», which aims to develop recommendations on the improvement of the EU crises response mechanisms by the increase of their sensitivity to conflict and context. As a result, prospects for further research

  6. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...

  7. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  8. Risks in ERP projects implementation : How communication and business processes re-engineering risks effect ERP projects

    OpenAIRE

    Aslanyan, Armine

    2017-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized by large capital outlay, long duration, and high might be a solution to ensure the success of ERP system implementations in organizations. The overall objective of this research is to to provide detailed analysis and impacts of busines...

  9. Implementation of knowledge management approach in project oriented activities. Experience from simulator upgrade project

    International Nuclear Information System (INIS)

    Pironkov, L.

    2010-01-01

    Project specifics: Replacement of analogue process control system with Ovation®based Distributed Control System; Hybrid solution with simulated I&C logic and stimulated Human Machine Interface; Initial design ‐“turn‐key” project based on standard relationship “single customer –single contractor

  10. Consensus implementation of a groundwater remediation project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hastings, K.R.; Carlson, D.S.

    1996-01-01

    Because of significant characterization uncertainties existing when the Record of Decision was signed and the unfavorable national reputation of groundwater pump and treat remediation projects, the Test Area North (TAN) groundwater ROD includes the evaluation of five emerging technologies that show potential for treating the organic contamination in situ or reducing the toxicity of contaminants above ground. Treatability studies will be conducted to ascertain whether any may be suitable for implementation at TAN to yield more timely or cost effective restoration of the aquifer. The implementation approach established for the TAN groundwater project is a consensus approach, maximizing a partnership relation with stakeholders in constant, iterative implementation decision making

  11. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  12. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  13. Implementation of Programmatic Quality and the Impact on Safety

    Science.gov (United States)

    Huls, Dale Thomas; Meehan, Kevin

    2005-01-01

    The purpose of this paper is to discuss the implementation of a programmatic quality assurance discipline within the International Space Station Program and the resulting impact on safety. NASA culture has continued to stress safety at the expense of quality when both are extremely important and both can equally influence the success or failure of a Program or Mission. Although safety was heavily criticized in the media after Colimbiaa, strong case can be made that it was the failure of quality processes and quality assurance in all processes that eventually led to the Columbia accident. Consequently, it is possible to have good quality processes without safety, but it is impossible to have good safety processes without quality. The ISS Program quality assurance function was analyzed as representative of the long-term manned missions that are consistent with the President s Vision for Space Exploration. Background topics are as follows: The quality assurance organizational structure within the ISS Program and the interrelationships between various internal and external organizations. ISS Program quality roles and responsibilities with respect to internal Program Offices and other external organizations such as the Shuttle Program, JSC Directorates, NASA Headquarters, NASA Contractors, other NASA Centers, and International Partner/participants will be addressed. A detailed analysis of implemented quality assurance responsibilities and functions with respect to NASA Headquarters, the JSC S&MA Directorate, and the ISS Program will be presented. Discussions topics are as follows: A comparison of quality and safety resources in terms of staffing, training, experience, and certifications. A benchmark assessment of the lessons learned from the Columbia Accident Investigation (CAB) Report (and follow-up reports and assessments), NASA Benchmarking, and traditional quality assurance activities against ISS quality procedures and practices. The lack of a coherent operational

  14. Chesapeake Bay Impact Structure Deep Drilling Project Completes Coring

    Directory of Open Access Journals (Sweden)

    the Scientific Staff of the Chesapeake Bay Impact Structure Deep Drilling Project

    2006-09-01

    Full Text Available The Chesapeake Bay Impact Structure Deep Drilling Project (CBIS Project completed its coring operations during September–December 2005 and April–May 2006. Cores were collected continuously to a total depth of 1766 m. The recovered section consists of 1322 m of impactites beneath 444 m of post-impact continental shelf sediments.The CBIS Project is a joint venture of the International Continental Scientifi c Drilling Program (ICDP and the U.S. Geological Survey (USGS. Project activities began with a planning workshop in September 2003 attended by sixtythree scientists from ten countries. Field operations began with site preparation in July 2005, and coring began in September 2005. Drilling, Observation and Sampling of theEarth’s Continental Crust (DOSECC was the general contractor for the drilling operations throughout 2005.

  15. IMPLEMENTING SMALL AND MEDIUM IT PROJECTS IN SMALL AND MEDIUM ENERPRISES

    Directory of Open Access Journals (Sweden)

    Felix DUMITRESCU

    2014-06-01

    Full Text Available Information technology is essential nowadays for all companies. Small enterprises are an important part of the economy and this article aims at providing some useful insight in implementing modern IT projects to their benefit. Due to the limited funding available for the IT infrastructure in most start-ups and small businesses, the projects should be adapted to fulfill the needs of the company for the lowest cost. The paper will start by defining small and medium project management theory and outlining the target of the study, small and medium sized companies. Next it will show a number of case studies of IT projects implemented in different types of small companies in Romania. Based on these implementations the article will draw some conclusions relevant to most small companies which need to design or improve their IT infrastructure.

  16. Contributions of the PMBok to the Project Management of an ERP System Implementation

    Directory of Open Access Journals (Sweden)

    Rui Manuel da Silva Gomes

    2013-12-01

    Full Text Available The implementation of Enterprise Resource Planning (ERP Systems has become generalized in companies and organizations, as a way to achieve the supply chain integration, to improve productivity and gain competitive advantages. Those implementations, more than simple technology projects, have revealed to be complex and time consuming business projects due to the structural and behaviour changes involved. This article analyzes, through the Project Coordinator’s point of view, two real cases of ERP implementation projects at Ibico Portuguesa, comparing the project management methodology adopted by Ibico with the Project Management Body of Knowledge (PMBoK, coming to the conclusion that the use of the PMBoK norms and best practices by the Project Manager could have been a success factor in those implementations, particularly referring to the elements that have been pointed as the most critical: planning, involvement and commitment of top management as well as stakeholders’ management.DOI:10.5585/gep.v4i2.37

  17. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  18. Investigating Time-Varying Drivers of Grid Project Emissions Impacts

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, Emily L.; Thayer, Brandon L.; Pal, Seemita; Studarus, Karen E.

    2017-11-15

    The emissions consequences of smart grid technologies depend heavily on their context and vary not only by geographical location, but by time of year. The same technology operated to meet the same objective may increase the emissions associated with energy generation for part of the year and decrease emissions during other times. The Grid Project Impact Quantification (GridPIQ) tool provides the ability to estimate these seasonal variations and garner insight into the time-varying drivers of grid project emissions impacts. This work leverages GridPIQ to examine the emissions implications across years and seasons of adding energy storage technology to reduce daily peak demand in California and New York.

  19. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  20. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  1. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  2. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts

  3. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  4. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  5. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  6. Lessons from implementation of ecohealth projects in Southern Africa: A principal investigator's perspective.

    Science.gov (United States)

    Chimbari, Moses John

    2017-11-01

    Ecohealth projects are designed to garner ownership among all stakeholders, such as researchers, communities, local leadership and policy makers. Ideally, designs should ensure that implementation goes smoothly and that findings from studies benefit the stakeholders, particularly bringing changes to the communities researched. Paradoxically, the process is fraught with challenges associated with implementation. Notwithstanding these challenges, evidence from projects implemented in southern Africa justify the need to invest in the subject of ecohealth. This paper describes and discusses a principal investigator's experience of leading ecohealth projects in Zimbabwe between 2002 and 2005, in Botswana between 2010 and 2014 and in South Africa (ongoing). The discourse is centred on issues of project management and leadership, transdisciplinarity, students' involvement, data management, community engagement, dissemination of research findings and the role of institutions in project management and implementation. The paper concludes that the ecohealth approach is valuable and should be encouraged making the following recommendations; 1) principal investigators must have a good understanding of socio-ecological systems, have excellent project management and writing skills, 2) more than one PI should be involved in the day-to-day running of the project in order to avoid disruption of project activities in the event that the PI leaves the project before it ends, 3) researchers should be trained in ecohealth principles and methodologies at the time of building the research teams, 4) full proposals should be developed with active participation of communities and stakeholders in order to develop a shared vision, 5) involvement of postdoctoral fellows and dedicated researchers with postgraduate students should be encouraged to avoid situations where some objectives are not fully addressed because of the narrow nature of students' work; and 6) citizen science should be

  7. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  8. Half Double Methodology – Leading projects to impact in half the time with double the impact

    DEFF Research Database (Denmark)

    Ehlers, Michael; Svejvig, Per

    this presentation to learn about the three core elements of the half-double methodology so that you can lead your projects to double the impact in half the time. Objectives: Summarize the half-double methodology and core elements of impact, flow, and leadership; explain how PMI’s project management tools can......Despite developments in agile methodologies over the last 20 years, the potential for optimization in projects is still significant. Current research shows that there are methodologies that can be used to reduce lead time and increase value creation of projects by 30% or more. Join...

  9. Assessment of an implementation project for a voip system: a case in the food industry

    Directory of Open Access Journals (Sweden)

    Tiago José Menezes Gonçalves

    2011-09-01

    Full Text Available In the twenty-first century, all organizations are affected directly or indirectly by the use of information technology and communication (ICT. The preparation of good projects to implement these technologies is relevant for a company to remain competitive compared to its competitors. In this context, this study analyzes the economic viability for the implementation of a communication system based on VoIP (Voice on Internet Protocol in a food company of the industrial sector. In this way, we compared the existing telephony system in the company with a proposed project for implementation of a VoIP system. Therefore, we performed the modeling of costs incurred through of equations and we used as indicators of project viability the break-even point analysis, the payback period analysis, the net present value and the internal rate of return. As result, it was concluded that the implementation of VoIP-based systems can result in large cost saving, allowing rapidly recovering of the capital invested in the project. This conclusion was confirmed by the analysis of all the indicators cited above, which allowed to recommend the implementation of the project and verify the applicability of cost models developed.

  10. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  11. Toward an effective implementation of clean development mechanism projects in China

    International Nuclear Information System (INIS)

    Zhang Zhongxiang

    2006-01-01

    With the already huge and growing amount of greenhouse gas emissions and a great deal of low-cost abatement options available, China is widely expected as the world's number one host country of clean development mechanism (CDM) projects. But, making this potential a reality represents a significant challenge for China, because there has been a general lack of awareness by both the Chinese government and business communities, clear institutional structure, and implementation strategy. This has raised great concern about China's ability to compete internationally for CDM projects and exploit fully its CDM potential. This paper aims to address how CDM projects will be effectively implemented in China by examining the major CDM capacity building projects in China with bilateral and multilateral donors, the treatment of low-cost, non-priority CDM projects, and how a system for application, approval, and implementation of CDM projects is set up in China and what roles the main institutional actors are going to play in the system. We conclude that these capacity building assistances, the establishment of streamlined and transparent CDM procedures and sound governance, and the lessons learned and experience gained from the implementation of the CDM project in Inner Mongolia and the two Prototype Carbon Fund' projects will help China to take advantage of CDM opportunities. Moreover, in order to further capitalize on its CDM potential, there is a pressing need for the Chinese government to amend its current interim CDM regulations, in particular those controversial provisions on the eligibility to participate in CDM projects in China and the distribution of the revenues derived from CDM project between the project developer and the Chinese government. We believe that taking these capacity building projects and the recommended actions to clearly define the sustainable development objective of the CDM and disseminate CDM knowledge to local authorities and project developers as

  12. Attention to impact pathways in EISs of large dam projects

    International Nuclear Information System (INIS)

    Brismar, Anna

    2004-01-01

    The importance of addressing cumulative environmental impacts in Environmental Impact Statements (EISs) of large development projects is increasingly underlined. However, cumulative impacts are generated through complex impact pathways, involving multiple root causes and lower and higher order effects, interlinked by cause-effect relationships. Consideration to potential impact pathways may thus be difficult without appropriate analytical methods, expertise, and supportive Environmental Impact Assessment guidelines and terms-of-references (TOR). This paper presents the results of an analysis of six EISs prepared for large dam projects between 1994 and 2001. The objective was to analyze if, how, and to what extent potential impact pathways involved in the generation of dam-related cumulative impacts have been addressed in the analyzed material. For this purpose, a theoretical framework was developed, which identifies four key root causes, their potential effects, and associated cause-effect relationships. The analysis revealed various shortcomings. Important imbalances were found in the degree of attention given to effects of different categories. Lower order effects received greater attention than higher order, and the potential effects of reservoir filling were more extensively attended to than those of flow blockage, storage, and regulation. Most importantly, little effort was made to carefully explain the potential impact pathways involved; root causes were often referred to in general terms only, and potential pathways leading up to an anticipated higher order effect or following upon an expected lower order effect were often inadequately addressed or ignored. Probable reasons for the discovered shortcomings are discussed and recommendations are presented for improving the World Bank EIA guidelines for large dam projects

  13. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  14. Impact of an aquaculture extension project in Bangladesh

    DEFF Research Database (Denmark)

    Rand, John; Tarp, Finn

    2009-01-01

    productivity and the value of fish production per capita among participants. However, in the long run no similar well-determined effect emerges. Second, MAEP appears to have had no significant impact on socioeconomic status as measured by consumption expenditure of participating households. The authors argue......This paper is an impact study of key short- and long-run effects of the Danida supported Mymensingh Aquaculture Extension Project (MAEP) in Bangladesh, applying different matching and double difference estimators. Results are mixed. First, the paper finds a positive short-run impact on pond...

  15. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  16. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  17. Radiological impact assessment within the IAEA Arctic Assessment Project (IASAP)

    DEFF Research Database (Denmark)

    Scott, E.M.; Gurbutt, P.; Harmes, I.

    1998-01-01

    As part of the International Arctic Seas Assessment Project (IASAP) of IAEA, a working group was created to model the dispersal and transfer of radionuclides released from radioactive waste disposed of in the Kara Sea and bays of Novaya Zemlya and to assess the radiological impact. Existing models...

  18. Livelihood impacts of forest carbon project and its implications for ...

    African Journals Online (AJOL)

    This study examines the impacts of forest carbon project on the livelihoods of rural households and its implications for the sustainability of forest by focusing on a regenerated forest in Humbo district of Southwestern Ethiopia. The methods through which primary data were gathered are a triangulation of household survey, ...

  19. Impact of externally funded projects on development of research ...

    African Journals Online (AJOL)

    Impact of externally funded projects on development of research capability of national agricultural research system. S K Sharma. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · AJOL African Journals Online. HOW TO USE AJOL.

  20. Projected impacts of climate change on Indian agriculture

    Indian Academy of Sciences (India)

    First page Back Continue Last page Overview Graphics. Projected impacts of climate change on Indian agriculture. Increase in CO2 to 550 ppm increases yields of rice, wheat, legumes and oilseeds by 10-20%. A 1oC increase in temperature may reduce yields of wheat, soybean, mustard, groundnut, and potato by 3-7%.

  1. Projected climate change impacts in rainfall erosivity over Brazil

    Science.gov (United States)

    Climate change projections and historical analyses have shown alterations in global precipitation dynamics, and therefore, it is also expected that there will be associated changes to soil erosion rates. The impacts of climate change on soil erosion may bring serious economic, social, and environmen...

  2. Impacts of commercial agricultural development project (CADP) on ...

    African Journals Online (AJOL)

    The study evaluates the impacts of the Commercial Agricultural Development Project (CADP) on the empowerment of farmers in Kaduna State with specific reference to Lere, Giwa and Kubau Local Government Areas for the period of 2010-2016. Survey and documentary research design were employed and data sourced ...

  3. Impact of Community Driven Development Project: A Case of ...

    African Journals Online (AJOL)

    This paper evaluates impact of Community Driven Development programme on infrastructure under National Fadama II Project in Oyo State Nigeria. Data were collected from two hundred and sixty-four farmers using multistage sampling procedures. Data were analyzed using descriptive statistics and infrastructure index.

  4. Key Success Factors of Renewable Energy Projects Implementation in Rural Areas of Indonesia

    Directory of Open Access Journals (Sweden)

    Wati Hermawati

    2017-12-01

    Full Text Available This paper is an exploratory study on renewable energy implementation in the rural areas of Indonesia. The study aim was to investigate the factors contributing to the sustainability of renewable energy projects in the rural areas. It mostly uses a qualitative approach. Primary data was mainly obtained from in-depth interviews conducted in site areas with the project owners, project managers, a key person in each local government, industry representatives, and the local community, including local leaders and users of renewable energy. Secondary data in the form of various official project reports was also used. The results indicated that the success of energy project implementation lay not only in good technology performance and long-term maintenance, but was also highly dependent on six key factors, namely: (1 project planning and development; (2 community participation; (3 active communication and beneficiaries; (4 availability of maintenance program, workshop and technician; (5 project management and institutionalization; (6 local government support and networks. The findings from this study provide useful insights to all stakeholders involved in the implementation of renewable energy technology for the rural areas in Indonesia.

  5. Biomass energy projects for joint implementation of the UN FCCC [Framework Convention on Climate Change

    International Nuclear Information System (INIS)

    Swisher, Joel N.; Renner, Frederick P.

    1998-01-01

    The UN Framework Convention on Climate Change (FCCC) allows for the joint implementation (JI) of measures to mitigate the emissions of greenhouse gases. The concept of JI refers to the implementation of such measures in one country with partial or full financial and/or technical support from another country, potentially fulfilling some of the supporting country's emission-reduction commitment under the FCCC. This paper addresses some key issues related to JI under the FCCC as they relate to the development of biomass energy projects for carbon offsets in developing countries. Issues include the reference case or baseline, carbon accounting and net carbon storage, potential project implementation barriers and risks, monitoring and verification, local agreements and host-country approval. All of these issues are important in project design and evaluation. We discuss briefly several case studies, which consist of a biomass-fueled co-generation projects under development at large sugar mills in the Philippines, India and Brazil, as potential JI projects. The case studies illustrate the benefits of bioenergy for reducing carbon emissions and some of the important barriers and difficulties in developing and crediting such projects. Results to date illustrate both the achievements and the difficulties of this type of project. (author)

  6. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    International Nuclear Information System (INIS)

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  7. Projected impacts of climate change on marine fish and fisheries

    DEFF Research Database (Denmark)

    Hollowed, Anne B.; Barange, Manuel; Beamish, Richard J.

    2013-01-01

    This paper reviews current literature on the projected effects of climate change on marine fish and shellfish, their fisheries, and fishery-dependent communities throughout the northern hemisphere. The review addresses the following issues: (i) expected impacts on ecosystem productivity and habitat......) implications for food security and associated changes; and (v) uncertainty and modelling skill assessment. Climate change will impact fish and shellfish, their fisheries, and fishery-dependent communities through a complex suite of linked processes. Integrated interdisciplinary research teams are forming...... in many regions to project these complex responses. National and international marine research organizations serve a key role in the coordination and integration of research to accelerate the production of projections of the effects of climate change on marine ecosystems and to move towards a future where...

  8. Quantitative indicators of the impacts generated in lineal development projects

    International Nuclear Information System (INIS)

    Ospina N, Jesus Efren; Lema T, Alvaro de J.

    2002-01-01

    This work outlines a methodological proposal for the elaboration of quantitative indicators of the impact caused by electrical power transmission projects, using the perspective of the model of environmental administration by dimensions (physical, biotic, cultural, economic, and political). The model achieved an integral and interdisciplinary analysis, managing to determine what the degree of impact that a project generates on a dimension and its relationships to the others, moreover the indicators identified are useful tools that should help support planning, project formulation, decisions making, and environmental studies, such as: environmental management plans and greater efficiency in the estimation of administrative costs, as well as in the techniques of generating location alternatives, and also may lead to better administration of economic and human resources, among others

  9. Environmentally Sustainable Transport. Implementation and Impacts for the Netherlands for 2030

    International Nuclear Information System (INIS)

    Van Wee, G.P.; Geurs, K.T.

    2000-02-01

    Dutch transport scenarios for the OECD project on Environmental Sustainable Transport (EST) are described in this Phase 3 report of the project. The EST project contains a business-as-usual scenario (BAU) and three EST scenarios which attain the EST criteria (i.e. a reduction of CO2 by 80%, NOx by 90%, VOC by 90%, PM10 by 90%): (1) a 'high-technology' scenario containing only technological changes, (2) a 'mobility-management' scenario containing only mobility changes, (3) a combination scenario containing a combination of technological and mobility changes. Furthermore, the report describes possible instrument packages for the implementation of EST and the social and economic impacts of EST. The main conclusions are: (1) only if a high increase in technological developments and/or very stringent behaviour adaptations and changes in spatial and economic structures at the national and international level are assumed, the EST criteria can be met, (2) if EST is to be realised, measures will have to be taken in the short term and innovative policy instruments must be developed and implemented. The implementation of the tradeable CO2 emission permit system for passenger and freight transport is crucial for the attainment of EST, (3) a timely implementation of the policy instruments for the attainment of EST means that the current policy life cycle must radically change, (4) the level of material wealth (expressed in GDP) and employment will be somewhat slower in EST compared to BAU, but several social factors will improve. Firstly, differences between societal groups in (a) travel behaviour, (b) the level of accessibility of economic and social opportunities and (c) (perceived) environmental quality will decrease. Secondly, the level of motorised transport will be strongly reduced which will improve traffic safety and reduce health problems caused by local air pollution and noise nuisance from road traffic and aviation

  10. Environmental impact assessments of wind energy projects: An Alberta example

    International Nuclear Information System (INIS)

    Brown, W.K.

    1993-01-01

    A description is presented of the environmental impact assessment for an Alberta windfarm, summarizing the rationale, process and results of the assessment, costs involved, and recommendations made. The Pe-kun-nee windfarm was designed as a 44 turbine, 9.9 kW windfarm. The assessment included consideration of the complete range of environmental impacts of the windfarm, including reviews of impacts associated with similar developments elsewhere. From an environmental perspective, the proposed site and transmission line route were exceedingly suitable for development. No major potential impacts were identified. Most impacts that could occur, including terrain and vegetation disturbance, were associated with the construction phase of the project. A series of mitigation measures were developed to minimize each identified impact. Monitoring during the operations phase of the development was recommended to: ensure that the revegetation of disturbed areas was adequate; verify the sound level model; and document the incidence of bird strikes. Potential aesthetic impacts were addressed through a proposed interpretive project designed to educate visitors, enhance the profile of the wind-energy industry, and provide local employment. The assessment was completed within 8 months of initiation at a cost less than $200,000

  11. Gas Regional Initiative. North West Regional Energy Market. Transmission Transparency Project. First Implementation Report

    International Nuclear Information System (INIS)

    2008-07-01

    The purpose of this report is to comment on the implementation of the TSO Transmission Transparency Project. In December 2007 sixteen TSOs presented a project plan which committed them to publishing information on capacity availability and gas flows at crossborder interconnection points in the North-West gas region. The data types to be published were agreed between TSOs and network users. It was agreed that TSOs would release new information on capacity and actual gas flows at crossborder interconnection points. The TSOs have committed to publishing the agreed information by three project milestones May, September or December 2008. At the end of May 2008 the TSOs submitted initial data to Ofgem (Office of the Gas and Electricity Markets) on implementation. This report presents the data submitted by the TSOs, provides comment on implementation progress and explains the next steps. This report does not approve or guarantee the accuracy of the data submitted by TSOs

  12. Appreciation of a Child’s Journey: Implementation of a Cardiac Action Research Project

    Directory of Open Access Journals (Sweden)

    Kate Alexa Dengler

    2012-01-01

    Full Text Available The aim of this paper is to provide an overview of the phases of the action research process involved in developing, implementing, and evaluating the Heart Beads program. The aim of the project is to enrich the hospital experience of children with cardiac conditions. Heart Beads involves children receiving unique beads specific to each cardiac treatment, procedure or event in recognition of their experiences, and endurance. An action research approach, involving a partnership between clinicians and researchers and emphasising the involvement of patients and their families, was used to guide the Heart Beads program. The project followed the five phases of action research: identification, investigation, program development, implementation, and evaluation. Heart Beads began as a small project which continues to grow in popularity and significance with children at a tertiary paediatric hospital in Sydney, Australia. The program is now being implemented nationwide with the vision that all Australian children hospitalised with cardiac conditions can benefit from Heart Beads.

  13. Governance Impact Assessment on Large Infrastructure Project (LIP Delivery

    Directory of Open Access Journals (Sweden)

    G. A. Zarewa

    2018-01-01

    Full Text Available The linkage of failures of many projects, including Large Infrastructure Projects (LIPs, to governance problems by previous studies implies that governance impacts projects’ performance. Identification and understanding of the impacts have therefore become necessary in order to ensure that projects are governed in a way that will ensure their successful delivery. This study assessed impact of governance on delivery of Large Infrastructure Projects (LIPs through a three phase research approach. The first phase involved literature review followed by semi-structured interviews with key stakeholders/role players in the governance of eight LIPs in different locations in Nigeria in the second phase. A thematic data analysis of the study’s findings was finally conducted in the third phase to identify themes and sub-themes after which conclusions were drawn. The study established that governance impacts LIPs delivery both positively and negatively depending on how the governance is approached. Four LIPs were successful due to proper initiation, setting aside funds for the projects at the onset, proactive risk management, top management support, and simple governance policies and structures. Intuitive initiation on political exigencies, tying funding to erratic sources of funding without contingency arrangement, Procuring Authorities’ (PAs disregard for due process and consultants’ advice, failure of a Procuring Authority (PA to meet contractual obligations and change of government were identified by the study as major governance aspects that led to the abandonment of 4 LIPs. The study concluded that there was a need for significant improvement and standardisation of approaches to governance of LIPs particularly in developing countries like Nigeria and accordingly recommends the development of a governance framework containing guidelines, including sanctions for violators, to guide the governance of the projects in the country.

  14. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  15. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  16. Using implementation tools to design and conduct quality improvement projects for faster and more effective improvement.

    Science.gov (United States)

    Ovretveit, John; Mittman, Brian; Rubenstein, Lisa; Ganz, David A

    2017-10-09

    Purpose The purpose of this paper is to enable improvers to use recent knowledge from implementation science to carry out improvement changes more effectively. It also highlights the importance of converting research findings into practical tools and guidance for improvers so as to make research easier to apply in practice. Design/methodology/approach This study provides an illustration of how a quality improvement (QI) team project can make use of recent findings from implementation research so as to make their improvement changes more effective and sustainable. The guidance is based on a review and synthesis of improvement and implementation methods. Findings The paper illustrates how research can help a quality project team in the phases of problem definition and preparation, in design and planning, in implementation, and in sustaining and spreading a QI. Examples of the use of different ideas and methods are cited where they exist. Research limitations/implications The example is illustrative and there is little limited experimental evidence of whether using all the steps and tools in the one approach proposed do enable a quality team to be more effective. Evidence supporting individual guidance proposals is cited where it exists. Practical implications If the steps proposed and illustrated in the paper were followed, it is possible that quality projects could avoid waste by ensuring the conditions they need for success are in place, and sustain and spread improvement changes more effectively. Social implications More patients could benefit more quickly from more effective implementation of proven interventions. Originality/value The paper is the first to describe how improvement and implementation science can be combined in a tangible way that practical improvers can use in their projects. It shows how QI project teams can take advantage of recent advances in improvement and implementation science to make their work more effective and sustainable.

  17. Implementing the Next Generation Science Standards: Impacts on Geoscience Education

    Science.gov (United States)

    Wysession, M. E.

    2014-12-01

    This is a critical time for the geoscience community. The Next Generation Science Standards (NGSS) have been released and are now being adopted by states (a dozen states and Washington, DC, at the time of writing this), with dramatic implications for national K-12 science education. Curriculum developers and textbook companies are working hard to construct educational materials that match the new standards, which emphasize a hands-on practice-based approach that focuses on working directly with primary data and other forms of evidence. While the set of 8 science and engineering practices of the NGSS lend themselves well to the observation-oriented approach of much of the geosciences, there is currently not a sufficient number of geoscience educational modules and activities geared toward the K-12 levels, and geoscience research organizations need to be mobilizing their education & outreach programs to meet this need. It is a rare opportunity that will not come again in this generation. There are other significant issues surrounding the implementation of the NGSS. The NGSS involves a year of Earth and space science at the high school level, but there does not exist a sufficient workforce is geoscience teachers to meet this need. The form and content of the geoscience standards are also very different from past standards, moving away from a memorization and categorization approach and toward a complex Earth Systems Science approach. Combined with the shift toward practice-based teaching, this means that significant professional development will therefore be required for the existing K-12 geoscience education workforce. How the NGSS are to be assessed is another significant question, with an NRC report providing some guidance but leaving many questions unanswered. There is also an uneasy relationship between the NGSS and the Common Core of math and English, and the recent push-back against the Common Core in many states may impact the implementation of the NGSS.

  18. Implementation of municipal health promoting projects in primary schools: teachers perspective

    DEFF Research Database (Denmark)

    Nordin, Lone Lindegard

    2013-01-01

    . The project is funded by the Danish Ministry of Science, University of Aarhus and Silkeborg municipality, and involves 5 primary schools, 23 teachers and 233 pupils from 7th to 9 class. The project is positioned within the critical approach to school health education and health promotion, developed......Implementation of municipally health promoting projects' in primary schools: teachers perspective Research question This paper discusses the findings from a qualitative research, that aimed to investigate how teachers in primary schools implemented municipal health promoting projects focusing...... that there is a “gap” between policy and practice according to aim, content and methods, and that teachers practice can be explained as coping mechanism. The key findings include: • Teachers practice is closer to traditional health education than critical health education. • Teachers priorities the mandatory teaching...

  19. Implementing practice management strategies to improve patient care: the EPIC project.

    Science.gov (United States)

    Attwell, David; Rogers-Warnock, Leslie; Nemis-White, Joanna

    2012-01-01

    Healthcare gaps, the difference between usual care and best care, are evident in Canada, particularly with respect to our aging, ailing population. Primary care practitioners are challenged to identify, prevent and close care gaps in their practice environment given the competing demands of informed, litigious patients with complex medical needs, ever-evolving scientific evidence with new treatment recommendations across many disciplines and an enhanced emphasis on quality and accountability in healthcare. Patient-centred health and disease management partnerships using measurement, feedback and communication of practice patterns and outcomes have been shown to narrow care gaps. Practice management strategies such as the use of patient registries and recall systems have also been used to help practitioners better understand, follow and proactively manage populations of patients in their practice. The Enhancing Practice to Improve Care project was initiated to determine the impact of a patient-centred health and disease management partnership using practice management strategies to improve patient care and outcomes for patients with chronic kidney disease (CKD). Forty-four general practices from four regions of British Columbia participated and, indeed, demonstrated that care and outcomes for patients with CKD could be improved via the implementation of practice management strategies in a patient-centred partnership measurement model of health and disease management.

  20. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  1. Economics of forests and REDD+ projects: Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2012-11-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. (Author)

  2. United States-Mexico Border Diabetes Prevalence Survey: lessons learned from implementation of the project.

    Science.gov (United States)

    de Cosío, Federico G; Díaz-Apodaca, Beatriz A; Ruiz-Holguín, Rosalba; Lara, Agustín; Castillo-Salgado, Carlos

    2010-09-01

    This paper reviews and discusses the main procedures and policies that need to be followed when designing and implementing a binational survey such as the United States of America (U.S.)-Mexico Border Diabetes Prevalence Study that took place between 2001 and 2002. The main objective of the survey was to determine the prevalence of diabetes in the population 18 years of age or older along U.S.-Mexico border counties and municipalities. Several political, administrative, financial, legal, and cultural issues were identified as critical factors that need to be considered when developing and implementing similar binational projects. The lack of understanding of public health practices, implementation of existing policies, legislation, and management procedures in Mexico and the United States may delay or cancel binational research, affecting the working relation of both countries. Many challenges were identified: multiagency/multifunding, ethical/budget clearances, project management, administrative procedures, laboratory procedures, cultural issues, and project communications. Binational projects are complex; they require coordination between agencies and institutions at federal, state, and local levels and between countries and need a political, administrative, bureaucratic, cultural, and language balance. Binational agencies and staff should coordinate these projects for successful implementation.

  3. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  4. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  5. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  6. Projected wood energy impact on US forest wood resources

    Energy Technology Data Exchange (ETDEWEB)

    Skog, K.E. [USDA Forest Service, Madison, WI (United States)

    1993-12-31

    The USDA Forest Service has developed long-term projections of wood energy use as part of a 1993 assessment of demand for and supply of resources from forest and range lands in the United States. To assess the impact of wood energy demand on timber resources, a market equilibrium model based on linear programming was developed to project residential, industrial, commercial, and utility wood energy use from various wood energy sources: roundwood from various land sources, primary wood products mill residue, other wood residue, and black liquor. Baseline projections are driven by projected price of fossil fuels compared to price of wood fuels and the projected increase in total energy use in various end uses. Wood energy use is projected to increase from 2.67 quad in 1986 to 3.5 quad in 2030 and 3.7 quad in 2040. This is less than the DOE National Energy Strategy projection of 5.5 quad in 2030. Wood energy from forest sources (roundwood) is projected to increase from 3.1 billion (10{sup 9}) ft{sup 3} in 1986 to 4.4. billion ft{sup 3} in 2030 and 4.8 billion ft{sup 3} in 2040 (88, 124 and 136 million m{sup 3}, respectively). This rate of increase of roundwood use for fuel -- 0.8 percent per year -- is virtually the same as the projected increase rate for roundwood for pulpwood. Pulpwood roundwood is projected to increase from 4.2 billion ft{sup 3} in 1986 to 6.0 billion ft{sup 3} in 2030 and 6.4 billion ft{sup 3} in 2040 (119, 170 and 183 million m{sup 3}, respectively).

  7. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  8. The SISTEMA Project contribution in the implementation of the GEO Geohazards Supersite initiative

    Science.gov (United States)

    Vilardo, Giuseppe; Sangianantoni, Agata; Borgstrom, Sven; D'Auria, Luca; De Martino, Prospero; Dolce, Mario; Isaia, Roberto; Marotta, Enrica; Martini, Marcello; Obrizzo, Francesco; Peluso, Rosario; Sansivero, Fabio; Scarpato, Giovanni; Siniscalchi, Valeria; Tammaro, Umberto; Tulino, Sabrina; Castellano, Mario; Bianco, Francesca

    2017-04-01

    permanent thermal infrared imagery monitoring network operating at Campi Flegrei has also been improved. Furthermore, an innovative method based on drone-borne IR cameras has been developed in order to measure the time variations of heat flux and chemical emissions. This will boost the definition of the activity state of a volcano allowing a better assessment of the related hazard and risk mitigation through the design and installation of two drones equipped with thermal camera. The impact of SISTEMA project is measured through the implementation of its services, the continued and further engagement of different stakeholders and the delivery of crucial communication for decision makers and end-users. The research promoted by its multidisciplinary data can have a crucial impact on the advancement of the Emergency Plans, contributing to a safe and sustainable society and economic development, geo-hazards assessment and a sustainable management of geo-resources.

  9. Environmental impact assessment for uranium mine, mill and in situ leach projects

    International Nuclear Information System (INIS)

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries

  10. Environmental impact assessment for uranium mine, mill and in situ leach projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries. 1 fig., 5 tabs.

  11. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  12. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    Energy Technology Data Exchange (ETDEWEB)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig [Atomic Energy of Canada Limited, Whiteshell Laboratories, Pinawa, Manitoba (Canada)

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysics and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits

  13. ANALYTICAL AND SCIENTIFIC REVIEW OF PROJECTS AND PROGRAMMES ON CHANGES STRATEGY IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    MLODETSKYY V. R.

    2017-01-01

    Full Text Available Formulation of the problem. Sustainable and successful functioning of the organization in today's competitive market conditions is possible if the organization is an open dynamic system capable of timely and adequately adapt to changes in the environment, this organization should initiate the implementation of innovations, both in production and organizational structure. Most suited for these conditions are project-oriented organizations, when the program's development strategy is developed with a detailed individual relatively independent stages, which are implemented as part of projects. In accordance with the development and improvement of the organization of control systems in the direction of increasing emphasis on the development strategy in relation to operating activities is an important task. Goal and tasks. Explore the hierarchical control system of project-oriented organization towards establishing information flows combine program management system with project management subsystems, included in this program. Conclusions. Concretized the concept of "program" and "project" as a result assumed that the program management is a permanent process in the organization that is adaptable to external changes, and project management (as defined is temporary, so the project management structure are subject to program management structures and are not permanent in the organization's management system.

  14. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  15. ON THE QUESTION OF CORPORATE FUNDING IMPLEMENTATION OF EXPLORATION AND PRODUCTION INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Voronin D. M.

    2016-03-01

    Full Text Available As part of the research, the content of the required theoretical and methodological tools in the field of corporate finance investment projects of exploration and production of hydrocarbons described. Indicated cash flow characteristics of such projects in accordance with the phases of the project, identified the risks associated with cash flows. In practical terms, the proposed approach to the financing of projects includes sequential algorithm deciding on the implementation of funding is considered on case studies and can be used in the process of financial planning oil and gas companies, in building policy project financing, corporate procedures and regulations. In solving problems of theoretical and applied scientific methods used in the study, including methods of logical, comparative and systematic analysis, as well as methods of economic-mathematical modeling.

  16. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  17. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  18. Some environmental impacts associated with project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    1976-01-01

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kiloton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. Based on overall results it appears important to give adequate attention to environmental effects resulting from nuclear fracturing experiments

  19. Project IVOR - Implementing victim-oriented reform of the criminal justice system in the European Union

    NARCIS (Netherlands)

    Biffi, Emanuela; Mulder, Eva; Pemberton, Antony; Santos, Manuela; Valério, Mafalda; Vanfraechem, Inge; van der Vorm, Benny

    2016-01-01

    Project IVOR – Implementing victim-oriented reform of the criminal justice system in the European Union (2014-2016) offers an overview of current research into and with victims’ rights and services, identifying lacunas in the knowledge base and offering a model which can serve to connect experience

  20. Implementing CDM projects. A guidebook to host country legal issues; CDM - Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Curnow, P [Baker and McKenzie, London (United Kingdom); Hodes, G [UNEP Risoe Centre on Energy, Climate and Sustainable Development, DTU, Roskilde (Denmark)

    2009-08-15

    The Clean Development Mechanism (CDM) continues to evolve organically, and many legal issues remain to be addressed in order to maximise its effectiveness. This Guidebook explains through case studies how domestic laws and regulatory frameworks in CDM Host Countries interact with international rules on carbon trading, and how the former can be enhanced to facilitate the implementation and financing of CDM projects. (author)

  1. Improving Astronomy Achievement and Attitude through Astronomy Summer Project: A Design, Implementation and Assessment

    Science.gov (United States)

    Türk, Cumhur; Kalkan, Hüseyin; Iskeleli', Nazan Ocak; Kiroglu, Kasim

    2016-01-01

    The purpose of this study is to examine the effects of an astronomy summer project implemented in different learning activities on elementary school students, pre-service elementary teachers and in-service teachers' astronomy achievement and their attitudes to astronomy field. This study is the result of a five-day, three-stage, science school,…

  2. Implementing the "Marketing You" Project in Large Sections of Principles of Marketing

    Science.gov (United States)

    Smith, Karen H.

    2004-01-01

    There is mounting pressure on business education to increase experiential learning at the same time that budget constraints are forcing universities to increase class size. This article explains the design and implementation of the "Marketing You" project in two large sections of Principles of Marketing to bring experiential learning into the…

  3. Implementing the Project Approach: A Case Study of Hybrid Pedagogy in a Hong Kong Kindergarten

    Science.gov (United States)

    Chen, Jennifer J.; Li, Hui; Wang, Jing-ying

    2017-01-01

    The Project Approach has been promoted in Hong Kong kindergartens since the 1990s. However, the dynamic processes and underlying mechanisms involved in the teachers' implementation of this pedagogical method there have not yet been fully investigated. This case study of one typical kindergarten in Hong Kong documented how and why eight teachers…

  4. Solution and implementation of project ''Simulator of WWER-440 nuclear power plant''

    International Nuclear Information System (INIS)

    Koukal, V.

    1985-01-01

    The time data are given of the development and construction of the simulator of a WWER-440 nuclear power plant unit. The individual tasks are summed up which are related to the project implementation, and cooperating institutions and enterprises are listed. (J.C.)

  5. Examining Success Factors Related to ERP Implementations in Higher Education Shared Services Projects

    Science.gov (United States)

    Stoyanoff, Dawn Galadriel Pfeiffer

    2012-01-01

    This study examined the enterprise resource planning (ERP) implementations that utilized a shared services model in higher education. The purpose of this research was to examine the critical success factors which were perceived to contribute to project success. This research employed a quantitative non-experimental correlational design and the…

  6. Effectiveness-implementation hybrid designs: combining elements of clinical effectiveness and implementation research to enhance public health impact.

    Science.gov (United States)

    Curran, Geoffrey M; Bauer, Mark; Mittman, Brian; Pyne, Jeffrey M; Stetler, Cheryl

    2012-03-01

    This study proposes methods for blending design components of clinical effectiveness and implementation research. Such blending can provide benefits over pursuing these lines of research independently; for example, more rapid translational gains, more effective implementation strategies, and more useful information for decision makers. This study proposes a "hybrid effectiveness-implementation" typology, describes a rationale for their use, outlines the design decisions that must be faced, and provides several real-world examples. An effectiveness-implementation hybrid design is one that takes a dual focus a priori in assessing clinical effectiveness and implementation. We propose 3 hybrid types: (1) testing effects of a clinical intervention on relevant outcomes while observing and gathering information on implementation; (2) dual testing of clinical and implementation interventions/strategies; and (3) testing of an implementation strategy while observing and gathering information on the clinical intervention's impact on relevant outcomes. The hybrid typology proposed herein must be considered a construct still in evolution. Although traditional clinical effectiveness and implementation trials are likely to remain the most common approach to moving a clinical intervention through from efficacy research to public health impact, judicious use of the proposed hybrid designs could speed the translation of research findings into routine practice.

  7. Project IMPACT: a report on barriers and facilitators to sustainability.

    Science.gov (United States)

    Blasinsky, Margaret; Goldman, Howard H; Unützer, Jürgen

    2006-11-01

    Project IMPACT is a collaborative care intervention to assist older adults suffering from major depressive disorder or dysthymia. Qualitative research methods were used to determine the barriers and facilitators to sustaining IMPACT in a primary care setting. Strong evidence supports the program's sustainability, but considerable variation exists in continuation strategies and operationalization across sites. Sustainability depended on the organizations' support of collaborative care models, the availability of staff trained in the intervention, and funding. The intervention's success was the most important sustainability factor, as documented by outcome data and through the "real world" experience of treating patients with this intervention.

  8. The Social and Economic Impacts of Space Weather (US Project)

    Science.gov (United States)

    Pulkkinen, A. A.; Bisi, M. M.; Webb, D. F.; Oughton, E. J.; Worman, S. L.; Taylor, S. M.; Onsager, T. G.; Adkins, J. E.; Baker, D. N.; Forbes, K. F.; Basoli, D.; Griot, O.

    2017-12-01

    The National Space Weather Action Plan calls for new research into the social and economic impacts of space weather and for the development of quantitative estimates of potential costs. In response to this call, NOAA's Space Weather Prediction Center (SWPC) and Abt Associates are working together to identify, describe, and quantify the impact of space weather to U.S. interests. This study covers impacts resulting from both moderate and severe space weather events across four technological sectors: Electric power, commercial aviation, satellites, and Global Navigation Satellite System (GNSS) users. It captures the full range of potential impacts, identified from an extensive literature review and from additional conversations with more than 50 sector stakeholders of diverse expertise from engineering to operations to end users. We organize and discuss our findings in terms of five broad but interrelated impact categories including Defensive Investments, Mitigating Actions, Asset Damages, Service Interruptions, and Health Effects. We also present simple, tractable estimates of the potential costs where we focused on quantifying a subset of all identified impacts that are apt to be largest and are also most plausible during moderate and more severe space weather scenarios. We hope that our systematic exploration of the social and economic impacts provides a foundation for the future work that is critical for designing technologies, developing procedures, and implementing policies that can effectively reduce our known and evolving vulnerabilities to this natural hazard.

  9. Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-08-01

    Full Text Available The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract The question is, was the optimum implementation accomplished? The provision for the success of the project is how are the daily activities managed by the three stakeholders of the project (contractor, owner, and consultant and their technical and practical capability to attain the balance of the project fundamental points (cost, time and quality taking into account the project objectives that were set by the owner. Despite the way, logical framework management and project’s major steps there is a group of elements which become major measures to determine the success or failure of the project, the research interested in these elements by a thorough study of references related to the success of a constructional project. To reinforce the theoretical study a field assessment of the housing project; this led to the recognition of the major elements that caused breaches of the evaluation criteria. The closed questionnaire and the regular forms based on the data and information collected through the theoretical review and the closed questionnaire to conclude and examine some concepts related by assessing the quality of building materials used in residential investment projects through the stages (planning - design-implementation Through the research a lot of deductions were made, the most important is that there cannot be an evaluation system

  10. A financing model to solve financial barriers for implementing green building projects.

    Science.gov (United States)

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  11. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    Science.gov (United States)

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  12. Chromosomocentric approach to overcoming difficulties in implementation of international project Human Proteome

    Directory of Open Access Journals (Sweden)

    A. I. Archakov

    2013-12-01

    Full Text Available The international project Human Proteome (PHP, being a logical continuation of the project Human Genome, was started on September 23, 2010. In correspondence with the genocentric approach, the PHP aim is to prepare a catalogue of all human proteins and to decipher a network of their interactions. The PHP implementation difficulties arise because the research subject itself – proteome – is much more complicated than genome. The major problem is the insufficient sensitivity of proteome methods that does not allow detecting low- and ultralow-copy proteins. Bad reproducibility of proteome methods and the lack of so-called “gold standard” is the second major complicacy in PHP implementation. The third problem is the dynamic character of proteome, its instabili­ty in time. The paper deals with possible variants of overcoming these complicacies, preventing from successful implementation of PHP.

  13. Joint implementation demo project between Denmark and Estonia - Phase 1. Final report

    International Nuclear Information System (INIS)

    2003-09-01

    This project is meant to contribute to form the basis of co-operation between Denmark and Estonia as regards Joint Implementation (JI) and thus gather experience in preparation for practical use of JI. A number of questions can be raised for discussion within this project: What is the scope for JI? What is the role of the host country government? Will JI survive the emerging Emission Trading? The project report gives a status of the present situation within the area of JI both internationally and in Estonia, including a resume of the Estonian National Climate Programme. Furthermore, a stakeholder analysis is presented, along with an illustration of the effect of Joint Implementation in the various energy sectors. (BA)

  14. Development and implementation of the regulatory control of sources in Latin American Model Project countries

    International Nuclear Information System (INIS)

    Ferruz Cruz, P.

    2001-01-01

    After a general assessment of the situation regarding radiation safety and the radiation protection infrastructure in Latin American countries, several of them were invited to participate in a Model Project oriented, in some cases, towards establishing a mechanism for national regulatory control of radiation sources, and in others, towards upgrading their national control programme. All these activities aimed at reaching an effective and sustainable radiation protection infrastructure based on international basic safety standards. The paper presents a general overview of the current situation with regard to radiation protection within the Model Project countries in Latin America after almost five years of activities. It includes: the implementation of regulatory issues; the control of occupational, medical and public exposures; emergency response and waste safety issues. The paper also presents some lessons learned during implementation concerning the numerous activities involved in this interregional project. (author)

  15. Institutional repository in communication: the REPOSCOM project implemented in the digital libraries federation of communication science

    Directory of Open Access Journals (Sweden)

    Sueli Mara Soares Pinto Ferreira

    2007-01-01

    Full Text Available Considering the conceptualization, characterization and context of the institutional repositories (IR this paper discuss the procedures, policies and strategies delineated to the implementation of IR in a research environment. The object of discussion is the project called Reposcom - Institutional Repository of Intercom (Brazilian Society of Interdisciplinary Studies of Communication – which is part of a broader project managed by the Portcom – Information Network in Communication Sciences of Countries of Portuguese Language – and called Digital Libraries Federation in the Communication Sciences. Aiming to share the knowledge and experience acquired with the implementation of the Reposcom, this paper describes its work activities, the decisions made, the customization of the software DSpace (the technological solution and the initial results achieved with the project.

  16. Implementing an interprofessional first-year teamwork project: some key reflections.

    Science.gov (United States)

    McNaughton, Susan Maree

    2013-09-01

    Implementing an interprofessional teamwork project for first-year students presents pedagogical and practical challenges. While transferable skills and attributes are important, engagement of students with limited professional experience in teamwork depends on relevance to current learning needs. This report outlines principles learned from planning and implementing a teamwork project for an interprofessional health administration and service development course. Practising interprofessional teamwork as leaders and teachers, aligning with previous, current and future teamwork content and processes and responding to student feedback and achievement have been the key factors in shaping the project over three semesters. Face-to-face and online interprofessional teamwork learning has necessitated developing resources that support self-direction, using familiar technology and providing enabling physical environments. Implications for first-year interprofessional teamwork are that structured well-resourced processes, responsiveness and alignment of learning all improve student outcomes.

  17. Practical implementation of joint projects for offshore wind; Praktiskt genomfoerande av gemensamma projekt foer havsbaserad vindkraft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    Cooperation mechanisms are part of the renewable s directive and aims to member countries to cooperate on renewable energy to meet their national targets a cost effective way. The Energy Agency has in previous assignments analyzed the possibilities and limitations of cooperation mechanisms and other countries' interest in the cooperation mechanisms. In the Appropriation Directions for 2013, the Energy Agency has been asked to contribute to the continued analysis and practical preparations for a possible cooperation with other member countries. The assignment covers several different types of cooperation. This report represents the Agency's accounting of the part of the commission on cooperation through joint projects. This part include, in consultation with the industry to develop a proposal for the practical use for the implementation of possible joint projects for offshore wind power. The mission aims to create greater clarity and facilitate the possible implementation of joint projects.

  18. Health Impact Assessment of an oil drilling project in California

    OpenAIRE

    Lindsay C. McCallum; Kathleen Souweine; Mary McDaniel; Bart Koppe; Christine McFarland; Katherine Butler; Christopher A. Ollson

    2016-01-01

    Objectives: The Health Impact Assessment (HIA) was conducted to evaluate the potential community health implications of a proposed oil drilling and production project in Hermosa Beach, California. The HIA considered 17 determinants of health that fell under 6 major categories (i.e., air quality, water and soil quality, upset conditions, noise and light emissions, traffic, and community livability). Material and Methods: This paper attempts to address some of the gaps within the HIA practice b...

  19. Uncertainties in projecting climate-change impacts in marine ecosystems

    DEFF Research Database (Denmark)

    Payne, Mark; Barange, Manuel; Cheung, William W. L.

    2016-01-01

    with a projection and building confidence in its robustness. We review how uncertainties in such projections are handled in marine science. We employ an approach developed in climate modelling by breaking uncertainty down into (i) structural (model) uncertainty, (ii) initialization and internal variability......Projections of the impacts of climate change on marine ecosystems are a key prerequisite for the planning of adaptation strategies, yet they are inevitably associated with uncertainty. Identifying, quantifying, and communicating this uncertainty is key to both evaluating the risk associated...... and highlight the opportunities and challenges associated with doing a better job. We find that even within a relatively small field such as marine science, there are substantial differences between subdisciplines in the degree of attention given to each type of uncertainty. We find that initialization...

  20. Impact of the Implementation of Information Technology on the Center for Army Lessons Learned

    National Research Council Canada - National Science Library

    Wizner, Anthony

    2001-01-01

    .... This research evaluates the impact that the implementation of an Information Technology infrastructure has had on the efficiency of Army's Lessons Learned Process and the overall effectiveness...

  1. EFFECTIVENESS OF AGILE COMPARED TO WATERFALL IMPLEMENTATION METHODS IN IT PROJECTS: ANALYSIS BASED ON BUSINESS INTELLIGENCE PROJECTS

    Directory of Open Access Journals (Sweden)

    Kisielnicki Jerzy

    2017-10-01

    Full Text Available The global Business Intelligence (BI market grew by 7.3% in 2016 according to the Gartner report (2017. Today, organizations require better use of data and analytics to support their business decisions. Internet power and business trend changes have provided a broad term for data analytics - Big Data. To be able to handle it and leverage a value of having access to Big Data, organizations have no other choice than to get proper systems implemented and working. However, traditional methods are not efficient for changing business needs. Long time between project start and go-live causes a gap between initial solution blueprint and actual user requirements at the end of the project. This article presents the latest market trends in BI systems implementation by comparing agile with traditional methods. It presents a case study provided in a large telecommunications company (350 BI users and the results of a pilot research provided in the three large companies: media, digital, and insurance. Both studies prove that agile methods might be more effective in BI projects from an end-user perspective and give first results and added value in a much shorter time compared to a traditional approach.

  2. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    Science.gov (United States)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  3. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  4. Factors Affecting Process Innovation Teams’ Learning and Their Impact on the Success of the Process Innovation Projects

    Directory of Open Access Journals (Sweden)

    İbrahim H. Seyrek

    2007-06-01

    Full Text Available Based on 145 process innovation teams, we have studied factors supporting team learning and their impact on the success of the process innovation projects. As a result, we have found that team vision, recording and reviewing project related information, filing, following a structural development process and co-location of team members are factors supporting team learning and project success. Also, two dimensions of learning, information acquisition and information implementation, are positively related to the success of the process innovation projects

  5. Impact of the implementation of electronic guidelines for cardiovascular prevention in primary care: study protocol

    Directory of Open Access Journals (Sweden)

    Eva Comin

    2013-03-01

    Full Text Available Background The electronic medical records software of the Catalan Institute of Health has recently incorporated an electronic version of clinical practice guidelines (e-CPGs. This study aims to assess the impact of the implementation of e-CPGs on the diagnosis, treatment, control and management of hypercholesterolaemia, diabetes mellitus type 2 and hypertension.Methods Eligible study participants are those aged 35–74 years assigned to family practitioners (FPs of the Catalan Institute of Health. Routinely collected data from electronic primary care registries covering 80% of the Catalan population will be analysed using two approaches: (1 a cross-sectional study to describe the characteristics of the sample before e-CPG implementation; (2 a controlled before-and-after study with 1-year follow-up to ascertain the effect of e-CPG implementation. Patients of FPs who regularly use the e-CPGs will constitute the intervention group; the control group will comprise patients assigned to FPs not regularly using the e-CPG. The outcomes are: (1 suspected and confirmed diagnoses, (2 control of clinical variables, (3 requests for tests and (4 proportions of patients with adequate drug prescriptions.Results This protocol should represent a reproducible process to assess the impact of the implementation of e-CPGs. We anticipate reporting results in late 2013.Conclusion This project will assess the effectiveness of e-CPGs to improve clinical decisions and healthcare procedures in the three disorders analysed. The results will shed light on the use of evidence-based medicine to improve clinical practice of FPs.

  6. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  7. Radioactive environmental impact assessment for a production project of titanium dioxide by chlorination process

    International Nuclear Information System (INIS)

    Qiu Guohua

    2010-01-01

    Based on the analysis of shifting direction of radionuclide in production process and the environmental investigation and monitoring, the radioactive environmental impact from a production project of titanium dioxide by chlorination process has been analyzed and assessed. The result of radioactive environmental investigation shows that values of assessment factors are in the range of environmental radioactive background. The radioactive environmental sensitive spot has been delineated. The results of radioactive environmental prediction show that the additional doses to workers and residents are 0.59 mSv/a and 9.28 × 10-4 mSv/a respectively which are less than the annual dose limits of administration. The radioactive environmental impact of the production project of the titanium dioxide by chlorination process will meet the needs of national regulations and standards if radiation protection and environmental protection measures are implemented and radioactive environmental monitoring are strengthened. (author)

  8. Impact of the implementation of a well-designed electronic laboratory notebook on bioanalytical laboratory function.

    Science.gov (United States)

    Zeng, Jianing; Hillman, Mark; Arnold, Mark

    2011-07-01

    This paper shares experiences of the Bristol-Myers Squibb Company during the design, validation and implementation of an electronic laboratory notebook (ELN) into the GLP/regulated bioanalytical analysis area, as well as addresses the impact on bioanalytical laboratory functions with the implementation of the electronic notebook. Some of the key points covered are: knowledge management - the project-based electronic notebook takes full advantage of the available technology that focuses on data organization and sharing so that scientific data generated by individual scientists became department knowledge; bioanalytical workflows in the ELN - the custom-built workflows that include data entry templates, validated calculation processes, integration with laboratory information management systems/laboratory instruments, and reporting capability improve the data quality and overall workflow efficiency; regulatory compliance - carefully designed notebook reviewing processes, cross referencing of distributed information, audit trail and software validation reduce compliance risks. By taking into consideration both data generation and project documentation needs, a well-designed ELN can deliver significant improvements in laboratory efficiency, work productivity, and regulatory compliance.

  9. Using implementation science as the core of the doctor of nursing practice inquiry project.

    Science.gov (United States)

    Riner, Mary E

    2015-01-01

    New knowledge in health care needs to be implemented for continuous practice improvement. Doctor of nursing practice (DNP) programs are designed to increase clinical practice knowledge and leadership skills of graduates. This article describes an implementation science course developed in a DNP program focused on advancing graduates' capacity for health systems leadership. Curriculum and course development are presented, and the course is mapped to depict how the course objectives and assignments were aligned with DNP Essentials. Course modules with rational are described, and examples of how students implemented assignments are provided. The challenges of integrating this course into the life of the school are discussed as well as steps taken to develop faculty for this capstone learning experience. This article describes a model of using implementation science to provide DNP students an experience in designing and managing an evidence-based practice change project. Copyright © 2015 Elsevier Inc. All rights reserved.

  10. PROJECT IMPLEMENTATION OF LEAN MANUFACTURING: A STUDY IN AUTOMOTIVE SUPPLY CHAIN

    Directory of Open Access Journals (Sweden)

    Marodin, G. A.

    2015-06-01

    Full Text Available Despite the fact that lean production (LP is widely used by companies from a broad number of countries and sectors, to achieve a mature LP project implementation is still considered hard to accomplish and sustain. The fact that LP is highly context dependent is one of the major difficulties that hinder its implementation. The extant knowledge about LP implementation from emerging markets is still murky and substantially lower than from developed countries This paper emphasizes LP in Brazil, one of the emerging economies where there is relatively little knowledge about how companies are implementing LP. The existing literature of LP in this country is rare and focused mainly on case studies with a few selected companies. For that, a survey with 49 firms of the automotive supply chain of Brazil was carried out and data collected was analyzed by means of multivariate techniques.

  11. Impact of metals recycling on a Swedish BWR decommissioning project

    International Nuclear Information System (INIS)

    Larsson, Arne; Lidar, Per; Hedin, Gunnar; Bergh, Niklas

    2014-01-01

    Decommissioning of nuclear power plants generates large volumes of radioactive or potentially contaminated metals. By proper management of the waste streams significant amounts can be free released and recycled either directly or after decontamination and melting. A significant part of the required work should be performed early in the process to make the project run smoothly without costly surprises and delays. A large portion of the clearance activities can be performed on-site. This on-site work should focus on the so called low-risk for contamination material. Other material can be decontaminated and released on site if schedule and the available facility areas so allow. It should be noted that the on-site decontamination and clearance activities can be a significant bottle neck for a decommissioning project. The availability of and access to a specialized metals recycling facility is an asset for a decommissioning project. This paper will describe the forecasted positive impact of a well-structured metals characterisation, categorisation and clearance process for a BWR plant decommissioning project. The paper is based on recent studies, performed projects and recent in-house development. (authors)

  12. EVALUATION OF THE IMPACT OF INNOVATIVE PROJECTS ON THE COMPETITIVENESS OF AGRICULTURAL HOLDINGS IN SLOVAK REPUBLIC

    Directory of Open Access Journals (Sweden)

    Ľubica RUMANOVSKÁ

    2013-01-01

    Full Text Available The scientific paper evaluates the impact of innovative projects on the competitiveness of agricultural holdings in SR. Evaluation of the impact of innovative projects on competitiveness of agricultural holdings was realized on the selected holdings in Nitra and Trnava region. For the evaluation was used RCR coefficient. With the use of RCR coefficient could be confirmed the scientific hypothesis - The innovative projects realized through Program for rural development SR 2007-2013 have positive impact on competitiveness of agricultural holdings. The possibilities for EU financial support for innovative projects in SR represent important source for introduction of new innovative technologies into production process and in future they can significantly contribute to the growth of competitiveness of agricultural subjects. Therefore, to increase competitiveness of agricultural holdings it is important to focus on modernization of machinery and buildings, use of natural sources for energy production, but also to increase the education and the flow of information between rural inhabitants, mainly farmers. In competitive area of EU agricultural sector it is necessary that agricultural holdings will innovate, not only to create independent flow of innovative products and knowledge, but also to increase its value on internal market. Agricultural holdings –receivers of financial support – have expressed the opinion that financial support realized through PRD SR 2007-2013 had definitely allowed them to implement new processes and products.

  13. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  14. [Results of the implementation of the Bacteremia Zero project in Catalonia, Spain].

    Science.gov (United States)

    Alvarez-Lerma, Francisco; Oliva, Glòria; Ferrer, Joan M; Riera, Alba; Palomar, Mercedes

    2014-07-01

    The nationwide Bacteremia Zero (BZ) Project consists in the simultaneous implementation of measures to prevent central venous catheter-related bacteremia (CVC-B) in critically ill patients and in the development of an integral safety plan. The objective is to present the results obtained after the implementation of the BZ project in the ICUs of the Autonomous Community of Catalonia, Spain. All patients admitted to ICUs in Catalonia participating in the ENVIN-HELICS registry between January 2009 and June 2010 were included. Information was provided by 36 (92.3%) of the total possible 39 ICUs. A total of 281 episodes of CVC-B were diagnosed (overall rate of 2.53 episodes per 1000 days of CVC). The rates have varied significantly between ICUs that participated in the project for more or less than 12 months (2.17 vs. 4.27 episodes per 1000 days of CVC, respectively; p<.0001). The implementation of the BZ Project in Catalonia has been associated with a decrease greater than 40% in the CVC-B rates in the ICUs of this community, which is much higher than the initial objective of 4 episodes per 1000 days of CVC). Copyright © 2014. Published by Elsevier Espana.

  15. Potential implementation of light steel housing system for affordable housing project in Malaysia

    Science.gov (United States)

    Saikah, M.; Kasim, N.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. A.

    2017-11-01

    An unparalleled number between housing demand and housing supply in Malaysia has increased the housing prices, which gives consequences to the homeownership issue. One way to reduce the housing price is by faster increase the number of affordable housing, but the construction sector faces difficulties in delivering as expected number by using conventional and current industrialised building system (IBS) due to the issue related high project cost, time and labour. Therefore, light steel housing (LSH) system as one of another type of IBS method can be utilised in housing construction project. This method can replace the conventional method that was currently used in the construction of affordable housing project. The objectives of this study are to identify the potential of LSH and influencing factors of system implementation. This is an initial stage to review the previous study related to LSH implementation in developed and developing countries. The previous study will be analysed regarding advantages and disadvantages of LSH and factors that influence the implementation of the system. Based on the literature review it is expected to define the potential and influencing factors of the LSH system. The findings are meaningful in framing and enhance construction housing method of an affordable housing project in Malaysia.

  16. Hidropower project implementation. Public investment priorities of Romanian Electricity Authority (RENEL)

    International Nuclear Information System (INIS)

    Bogdan Valeriu; Pencea, Doru

    1994-01-01

    RENEL manages more than 20 hydropower projects in various construction stages. Some of them are multipurpose projects designed for water supply, flood control and irrigation. The construction schedules and completion terms are prolonged for all of them due to insufficient investment funds. Priority in public investment for hydropower projects is necessary because it generates favorable effects for both local communities and national economy. Appropriate methodology and suitable criteria should be established in order to select the projects to be financed taking into account the large initial investments and long implementation terms. The national hydropower potential is around 40,000 GWh/year and the corresponding installed power would be 14,800 MW. At present, the power production capacity is 16,240 GWh/year and the installed hydropower is 5,880 MW. (authors)

  17. Impact of mining projects on the socio-economics of the region

    International Nuclear Information System (INIS)

    Rao, K.R.; Yerpude, R.R.

    1994-01-01

    Mining of mineral deposits, if exploited economically, would generate prospects of significant employment of non-inflationary nature, in developing countries. Exploitation of remotely located mineral deposits contributes in developing inaccessible regions thereby improving socio-economics of the region benefiting the local inhabitants and supplementing the efforts towards national integration. However, an indifferent attitude of the project management towards environment and welfare of local population will result in clash of interests and perpetual litigations which not only impede progress of the project but also lead to law and order problems. A precondition for successful implementation of any project is to understand the possible impact it has, on the socio-economics of the region and educate the local inhabitants to derive optimum advantage from the project. In this paper, two cases of mining projects, one located remotely and the other close to a well developed city are studied and their impact on the socio-economics of the respective regions is presented. 5 refs., 2 figs., 1 tab

  18. Impact of internal variability on projections of Sahel precipitation change

    Science.gov (United States)

    Monerie, Paul-Arthur; Sanchez-Gomez, Emilia; Pohl, Benjamin; Robson, Jon; Dong, Buwen

    2017-11-01

    The impact of the increase of greenhouse gases on Sahelian precipitation is very uncertain in both its spatial pattern and magnitude. In particular, the relative importance of internal variability versus external forcings depends on the time horizon considered in the climate projection. In this study we address the respective roles of the internal climate variability versus external forcings on Sahelian precipitation by using the data from the CESM Large Ensemble Project, which consists of a 40 member ensemble performed with the CESM1-CAM5 coupled model for the period 1920-2100. We show that CESM1-CAM5 is able to simulate the mean and interannual variability of Sahel precipitation, and is representative of a CMIP5 ensemble of simulations (i.e. it simulates the same pattern of precipitation change along with equivalent magnitude and seasonal cycle changes as the CMIP5 ensemble mean). However, CESM1-CAM5 underestimates the long-term decadal variability in Sahel precipitation. For short-term (2010-2049) and mid-term (2030-2069) projections the simulated internal variability component is able to obscure the projected impact of the external forcing. For long-term (2060-2099) projections external forcing induced change becomes stronger than simulated internal variability. Precipitation changes are found to be more robust over the central Sahel than over the western Sahel, where climate change effects struggle to emerge. Ten (thirty) members are needed to separate the 10 year averaged forced response from climate internal variability response in the western Sahel for a long-term (short-term) horizon. Over the central Sahel two members (ten members) are needed for a long-term (short-term) horizon.

  19. The use of high impact practices (HIPs) on chemistry lesson design and implementation by pre-service teachers

    Science.gov (United States)

    Chamrat, Suthida; Apichatyotin, Nattaya; Puakanokhirun, Kittaporn

    2018-01-01

    The quality of lesson design is essential to learning effectiveness. Research shows some characteristics of lessons have strong effect on learning which were grouped into "High Impact Practices or HIPs. This research aims to examine the use of HIPs on chemistry lesson design as a part of Teaching Science Strand in Chemistry Concepts course. At the first round of lesson design and implementing in classroom, 14 chemistry pre-services teachers freely selected topics, designed and implemented on their own ideas. The lessons have been reflected by instructors and their peers. High Impact Practices were overtly used as the conceptual framework along with the After-Action Review and Reflection (AARR). The selected High Impact practice in this study consisted of 6 elements: well-designed lesson, vary cognitive demand/academic challenge, students center approach, opportunity of students to reflect by discussion or writing, the assignment of project based learning or task, and the lesson reflects pre-service teachers' Technological Pedagogical Content Knowledge (TPACK). The second round, pre-service teachers were encouraged to explicitly used 6 High Impact Practices in cooperated with literature review specified on focused concepts for bettering designed and implemented lessons. The data were collected from 28 lesson plans and 28 classroom observations to compare and discuss between the first and second lesson and implementation. The results indicated that High Impact Practices effect on the quality of delivered lesson. However, there are some elements that vary on changes which were detailed and discussed in this research article.

  20. Assessing health impacts of the Chad-Cameroon petroleum development and pipeline project: challenges and a way forward

    International Nuclear Information System (INIS)

    Utzinger, Juerg; Wyss, Kaspar; Moto, Daugla D.; Yemadji, N'Diekhor; Tanner, Marcel; Singer, Burton H.

    2005-01-01

    Health impact assessment (HIA) of projects, programmes and policies is increasingly recognized as a powerful methodology for mitigating negative health impacts and enhancing equitable and sustainable development, yet applications in the developing world are sparse. Here, we focus on a large infrastructure development in sub-Saharan Africa, namely the Chad-Cameroon petroleum development and pipeline project. We adapted a five-step process for HIA, consisting of (1) screening of project documents, (2) profiling of affected communities, (3) identifying priority health areas, predicting potential impacts, and proposing mitigation measures, (4) implementing interventions, and (5) monitoring and evaluation of health impacts. We found that project scoping was broad, including extensive environmental and social assessments. Innovative features of the project include the high degree of public-private partnerships, and the management of oil revenues for purposes of poverty reduction. The project also addressed occupational and public health issues, and developed and implemented measures to prevent or mitigate potential health impacts. However, there was a disproportionate emphasis on workers' health, particularly on the prevention/mitigation of construction-related injuries, sexually transmitted infections (STIs; mainly HIV/AIDS), and malaria. Health impacts among surrounding communities, and cumulative health impacts in the larger region were not considered in a comprehensive way. Concluding, there is a need for a more systemic approach to HIA and its incorporation within 'Equator Principles', which are increasingly adopted by the international financial community. This process would include clarification of corporate social responsibility beyond the project fence line in the mitigation of health problems at regional levels. Finally, we propose the establishment and running of a longitudinal demographic surveillance system, which--coupled with regular household surveys

  1. Toward Elimination of Dog-Mediated Human Rabies: Experiences from Implementing a Large-scale Demonstration Project in Southern Tanzania.

    Science.gov (United States)

    Mpolya, Emmanuel Abraham; Lembo, Tiziana; Lushasi, Kennedy; Mancy, Rebecca; Mbunda, Eberhard M; Makungu, Selemani; Maziku, Matthew; Sikana, Lwitiko; Jaswant, Gurdeep; Townsend, Sunny; Meslin, François-Xavier; Abela-Ridder, Bernadette; Ngeleja, Chanasa; Changalucha, Joel; Mtema, Zacharia; Sambo, Maganga; Mchau, Geofrey; Rysava, Kristyna; Nanai, Alphoncina; Kazwala, Rudovick; Cleaveland, Sarah; Hampson, Katie

    2017-01-01

    A Rabies Elimination Demonstration Project was implemented in Tanzania from 2010 through to 2015, bringing together government ministries from the health and veterinary sectors, the World Health Organization, and national and international research institutions. Detailed data on mass dog vaccination campaigns, bite exposures, use of post-exposure prophylaxis (PEP), and human rabies deaths were collected throughout the project duration and project areas. Despite no previous experience in dog vaccination within the project areas, district veterinary officers were able to implement district-wide vaccination campaigns that, for most part, progressively increased the numbers of dogs vaccinated with each phase of the project. Bite exposures declined, particularly in the southernmost districts with the smallest dog populations, and health workers successfully transitioned from primarily intramuscular administration of PEP to intradermal administration, resulting in major cost savings. However, even with improved PEP provision, vaccine shortages still occurred in some districts. In laboratory diagnosis, there were several logistical challenges in sample handling and submission but compared to the situation before the project started, there was a moderate increase in the number of laboratory samples submitted and tested for rabies in the project areas with a decrease in the proportion of rabies-positive samples over time. The project had a major impact on public health policy and practice with the formation of a One Health Coordination Unit at the Prime Minister's Office and development of the Tanzania National Rabies Control Strategy, which lays a roadmap for elimination of rabies in Tanzania by 2030 by following the Stepwise Approach towards Rabies Elimination (SARE). Overall, the project generated many important lessons relevant to rabies prevention and control in particular and disease surveillance in general. Lessons include the need for (1) a specific unit in the

  2. IMPROVING THE PROVISION OF STATE GUARANTEES UNDER CREDITS OR BONDED LOANS RAISED FOR INVESTMENT PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Lola D. Sanginova

    2015-01-01

    Full Text Available Importance: Under current conditions, the Russian economy needs investment resources to ensure sustainable social and economic development. One of instruments of state-financing backing that can be used to support capital intensive, economically viable, financially and socially efficient investment projects that create "growing points" are state guarantees of theRussian Federation.Objective: The objective of this study is to identify possible ways to improve the requirements and procedures of providing state guarantees of theRussian Federationwhich contribute to the increase in the quantity and quality of investment projects of high social importance. Methods: Through the use of general scientific methods, analysis and synthesis, induction and deduction the possibility of creating a more attractive environment for principals is analyzed, measures to reduce the risk for public legal entities in providing state guarantees of theRussian Federationunder credits or bonded loans raised for investment projects implementation.Results: Principles of state guarantee support that ensure the interests of both the principals and the guarantor are defined. The basic directions for improving the mechanism how state guarantees of theRussian Federationsupport investment projects are justified. These directions include increasing availability of obtaining state guarantee support by lowering the cost of investment projects for which the state guarantees may be provided; reducing time of decision making on granting a state guarantee; increasing the creditors’ responsibility for a qualitative assessment of the creditworthiness of principals and investment projects; changing the methodology for assessing the social efficiency of investment projects; increasing the information transparency of provided state guarantees of the Russian Federation.Conclusions: The main result of this study is that under current conditions of economic turbulence state guarantees of the

  3. Implementation of targeted medication adherence interventions within a community chain pharmacy practice: The Pennsylvania Project.

    Science.gov (United States)

    Bacci, Jennifer L; McGrath, Stephanie Harriman; Pringle, Janice L; Maguire, Michelle A; McGivney, Melissa Somma

    2014-01-01

    To identify facilitators and barriers to implementing targeted medication adherence interventions in community chain pharmacies, and describe adaptations of the targeted intervention and organizational structure within each individual pharmacy practice. Qualitative study. Central and western Pennsylvania from February to April 2012. Rite Aid pharmacists staffed at the 118 Pennsylvania Project intervention sites. Qualitative analysis of pharmacists' perceptions of facilitators and barriers experienced, targeted intervention and organizational structure adaptations implemented, and training and preparation prior to implementation. A total of 15 key informant interviews were conducted from February to April 2012. Ten pharmacists from "early adopter" practices and five pharmacists from "traditionalist" practices were interviewed. Five themes emerged regarding the implementation of targeted interventions, including all pharmacists' need to understand the relationship of patient care programs to their corporation's vision; providing individualized, continual support and mentoring to pharmacists; anticipating barriers before implementation of patient care programs; encouraging active patient engagement; and establishing best practices regarding implementation of patient care services. This qualitative analysis revealed that there are a series of key steps that can be taken before the execution of targeted interventions that may promote successful implementation of medication therapy management in community chain pharmacies.

  4. Implementation of visitor pattern in processing a syntax tree in Qlab project

    Directory of Open Access Journals (Sweden)

    Đenić Aleksandar

    2012-01-01

    Full Text Available Qlab is an open-source project that supports various mathematical calculations, specialized for academic use. It has been developed at the Faculty of Mathematics, University of Belgrade, and is supported by Microsoft Serbia. In this paper we present some of Qlab’s successfully implemented core solutions. More precisely, in our approach we use a specialized Visitor pattern to optimize the management of syntax tree commands that our parser sends to our engine. This allows the processing of a larger scale of tree implementation using the Visitor interface.

  5. Modelling income distribution impacts of water sector projects in Bangladesh.

    Science.gov (United States)

    Ahmed, C S; Jones, S

    1991-09-01

    Dynamic analysis was conducted to assess the long-term impacts of water sector projects on agricultural income distribution, and sensitivity analysis was conducted to check the robustness of the 5 assumptions in this study of income distribution and water sector projects in Bangladesh. 7 transitions are analyzed for mutually exclusive irrigation and flooding projects: Nonirrigation to 1) LLP irrigation, 2) STW irrigation, 3) DTW irrigation, 4) major gravity irrigation, and manually operated shallow tubewell irrigation (MOSTI) and Flood Control Projects (FCD) of 6) medium flooded to shallow flooded, and 7) deeply flooded to shallow flooded. 5 analytical stages are involved: 1) farm budgets are derived with and without project cropping patterns for each transition. 2) Estimates are generated for value added/hectare from each transition. 3) Assumptions are made about the number of social classes, distribution of land ownership between classes, extent of tenancy for each social class, term of tenancy contracts, and extent of hiring of labor for each social class. 4) Annual value added/hectare is distributed among social classes. 5) Using Gini coefficients and simple ratios, the distribution of income between classes is estimated for with and without transition. Assumption I is that there are 4 social classes defined by land acreage: large farmers (5 acres), medium farmers (1.5-5.0), small farmers, (.01-1.49), and landless. Assumption II is that land distribution follows the 1978 Land Occupancy Survey (LOS). Biases, if any, are indicated. Assumption III is that large farmers sharecrop out 15% of land to small farmers. Assumption IV is that landlords provide nonirrigated crop land and take 50% of the crop, and, under irrigation, provide 50% of the fertilizer, pesticide, and irrigation costs and take 50% of the crop. Assumption V is that hired and family labor is assumed to be 40% for small farmers, 60% for medium farmers, and 80% for large farmers. It is understood that

  6. Tensions related to implementation of postgraduate degree projects in specialist nursing education.

    Science.gov (United States)

    German Millberg, Lena; Berg, Linda; Lindström, Irma; Petzäll, Kerstin; Öhlén, Joakim

    2011-04-01

    In conjunction with the introduction of the Bologna process in Sweden, specialist nursing education programmes were moved up to the second cycle of higher education with the opportunity to take a one-year master's degree, which also meant that students would undertake a degree project carrying 15 ECTS. The purpose of this study was to examine the introduction of postgraduate degree projects on the second-cycle level into Swedish specialist nursing programmes in accordance with the Bologna process. Five universities were involved and the study design took the form of action research. Problem formulation, planning, evaluation and follow-up with reflection led to new actions over a period of 2 1/2 years. Through a review of local curriculum documents, the implementation of a postgraduate degree project was monitored and these reviews, together with field notes, were analysed by means of constant comparative analysis. The results revealed a variety of tensions that arose when postgraduate degree projects were introduced, taking the form of differing views on the relationship between research, clinical development, specific professional objectives and academic objectives. These tensions were reflected in six areas of change. In summary, it can be noted that implementation of the postgraduate degree projects highlighted tensions related to basic views of learning. Copyright © 2010 Elsevier Ltd. All rights reserved.

  7. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  8. Influence of the choice of projection manifolds in the CASPT2 implementation

    Czech Academy of Sciences Publication Activity Database

    Yanai, T.; Kurashige, Y.; Saitow, M.; Chalupský, Jakub; Lindh, R.; Malmqvist, P. A.

    2017-01-01

    Roč. 115, 17/18 (2017), s. 2077-2085 ISSN 0026-8976 R&D Projects: GA ČR GA15-19143S Institutional support: RVO:61388963 Keywords : multireference theory * CASPT2 * MOLCAS * computer-aided programming Subject RIV: CF - Physical ; Theoretical Chemistry OBOR OECD: Physical chemistry Impact factor: 1.870, year: 2016

  9. Implementation of quality management in early stages of research and development projects at a university.

    Science.gov (United States)

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  10. Effort estimation for enterprise resource planning implementation projects using social choice - a comparative study

    Science.gov (United States)

    Koch, Stefan; Mitlöhner, Johann

    2010-08-01

    ERP implementation projects have received enormous attention in the last years, due to their importance for organisations, as well as the costs and risks involved. The estimation of effort and costs associated with new projects therefore is an important topic. Unfortunately, there is still a lack of models that can cope with the special characteristics of these projects. As the main focus lies in adapting and customising a complex system, and even changing the organisation, traditional models like COCOMO can not easily be applied. In this article, we will apply effort estimation based on social choice in this context. Social choice deals with aggregating the preferences of a number of voters into a collective preference, and we will apply this idea by substituting the voters by project attributes. Therefore, instead of supplying numeric values for various project attributes, a new project only needs to be placed into rankings per attribute, necessitating only ordinal values, and the resulting aggregate ranking can be used to derive an estimation. We will describe the estimation process using a data set of 39 projects, and compare the results to other approaches proposed in the literature.

  11. Impacts of James Bay project on Cree communities

    International Nuclear Information System (INIS)

    Senecal, P.; Egre, D.

    1993-01-01

    The LaGrande hydroelectric project in northwest Quebec, originally begun in 1972, was blocked by the Cree Indians and a negotiated settlement was reached in 1975 to continue it in exchange for compensation, land rights, and other matters. The James Bay and Northern Quebec Agreement contained provisions regulating the use of land and aimed at preserving the traditional Cree way of life. Other complementary agreements were signed in the 1980s. The impact of river-system modifications on wildlife harvesting and the effect of access roads on Cree communities are discussed. Flooding of hunting lands affected some traplines, and the low productivity of shore habitats and the high levels of mercury in some fish have greatly limited use of the LaGrande reservoirs for other purposes. Stream navigation at some communities was made more difficult because of changed river flows. The impact of the roads has been more positive, since the roads have facilitated trade and reduced local prices of many goods, and made wildlife harvesting easier and more evenly distributed. An income security program for hunters, fishers, and trappers has helped preserve a traditional lifestyle. A sharp increase in salary income, indicating consolidation of the employment market in the region, is the most significant economic impact of the LaGrande project agreement. 6 refs

  12. Uncertainty in projected impacts of climate change on biodiversity

    DEFF Research Database (Denmark)

    Garcia, Raquel A.

    Evidence for shifts in the phenologies and distributions of species over recent decades has often been attributed to climate change. The prospect of greater and faster changes in climate during the 21st century has spurred a stream of studies anticipating future biodiversity impacts. Yet, uncerta......Evidence for shifts in the phenologies and distributions of species over recent decades has often been attributed to climate change. The prospect of greater and faster changes in climate during the 21st century has spurred a stream of studies anticipating future biodiversity impacts. Yet......, uncertainty is inherent to both projected climate changes and their effects on biodiversity, and needs to be understood before projections can be used. This thesis seeks to elucidate some of the uncertainties clouding assessments of biodiversity impacts from climate change, and explores ways to address them...... models, are shown to be affected by multiple uncertainties. Different model algorithms produce different outputs, as do alternative future climate models and scenarios of future emissions of greenhouse gases. Another uncertainty arises due to omission of species with small sample sizes, which...

  13. Impact of Staff Organizational Culture on the Implementation of ...

    African Journals Online (AJOL)

    values and norms on the implementation of automation in libraries of Federal Universities in the North. East Zone of Nigeria. .... performance, etc. that is, values influence a person's or .... clientele/customer service satisfaction, and a concern for ...

  14. LIFE+ TRUST project: tool to assist the implementation of the Framework Directive 2000/60/CE, methodology and results

    Directory of Open Access Journals (Sweden)

    Vincenzo Marsala

    2014-09-01

    Full Text Available The TRUST project is funded by the European Commission’s by the Life+ Programme. The aim of the TRUST project is the identification of the adaption and mitigation measures to counteract the impacts of climate change on the groundwater of the Upper Plain in the Veneto and Friuli region in North-Eastern Italy. The TRUST project aims at implementing a water balance modelling tool to support institutions in formulating sustainable water management planning policies and best practices. This paper reviews the development and application of the tools for the groundwater balance model that simulate the groundwater deficit. Projections on the water deficit as a function of Climate Change have used future precipitation and evapotranspiration patterns derived from climate simulations (SRES-IPCC scenarios A1B and A2 of the Mediterranean region for the 20th and 21st centuries. Model outputs showed that a significant part of future water deficit might be recovered with Managed Aquifer Recharge that will permit the groundwater management preventing the climate change effect.

  15. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    DEFF Research Database (Denmark)

    Zaballa Romero, Mauricio Ernesto; Trærup, Sara Lærke Meltofte; Wieben, Emilie

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource...... but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private...... needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences...

  16. CONTRIBUTIONS OF CAD / CAE TECHNOLOGY IN DEVELOPMENT PROJECTS OF AGRICULTURAL MACHINERY AND IMPLEMENTS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Flavio Ricci Martinez

    2017-12-01

    Full Text Available This work aims to understand the contributions of CAD / CAE technology development projects Agricultural Machinery and Implements. The segment of Agricultural Machinery and Implements part of capital goods, which provides items that will be used to produce goods and services in other sectors and that is strategic in many economically and for innovation and technological diffusion in the country sector. To achieve the proposed objective a case study was conducted at a manufacturer of this type of product (combines, planters, tractors, etc. located in the region of Ribeirão Preto. Among the main contributions can excel found to reduce the time and costs of the project, the largest customer interaction, integration with the staff and the increased ability to test alternative solutions for solving problems.

  17. Environmental impact directory system: preliminary implementation for geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Hess, F.D.; Hall, R.T.; Fullenwider, E.D.

    1976-07-01

    An Environmental Impact Directory System (EIDS) was proposed as a method for a computerized search of the widely distributed data files and models pertaining to energy-related environmental effects. To define the scope and content of the system, an example was prepared for the case of geothermal energy. The resulting sub-directory is known as GEIDs (Geothermal Environmental Impact Directory System). In preparing or reviewing an Environmental Impact Statement (EIS), the user may employ GEIDS as an extensive checklist to make sure he has taken into account all predictable impacts at any level of severity.

  18. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  19. A National Implementation Project to Prevent Catheter-Associated Urinary Tract Infection in Nursing Home Residents.

    Science.gov (United States)

    Mody, Lona; Greene, M Todd; Meddings, Jennifer; Krein, Sarah L; McNamara, Sara E; Trautner, Barbara W; Ratz, David; Stone, Nimalie D; Min, Lillian; Schweon, Steven J; Rolle, Andrew J; Olmsted, Russell N; Burwen, Dale R; Battles, James; Edson, Barbara; Saint, Sanjay

    2017-08-01

    Catheter-associated urinary tract infection (UTI) in nursing home residents is a common cause of sepsis, hospital admission, and antimicrobial use leading to colonization with multidrug-resistant organisms. To develop, implement, and evaluate an intervention to reduce catheter-associated UTI. A large-scale prospective implementation project was conducted in community-based nursing homes participating in the Agency for Healthcare Research and Quality Safety Program for Long-Term Care. Nursing homes across 48 states, Washington DC, and Puerto Rico participated. Implementation of the project was conducted between March 1, 2014, and August 31, 2016. The project was implemented over 12-month cohorts and included a technical bundle: catheter removal, aseptic insertion, using regular assessments, training for catheter care, and incontinence care planning, as well as a socioadaptive bundle emphasizing leadership, resident and family engagement, and effective communication. Urinary catheter use and catheter-associated UTI rates using National Healthcare Safety Network definitions were collected. Facility-level urine culture order rates were also obtained. Random-effects negative binomial regression models were used to examine changes in catheter-associated UTI, catheter utilization, and urine cultures and adjusted for covariates including ownership, bed size, provision of subacute care, 5-star rating, presence of an infection control committee, and an infection preventionist. In 4 cohorts over 30 months, 568 community-based nursing homes were recruited; 404 met inclusion criteria for analysis. The unadjusted catheter-associated UTI rates decreased from 6.78 to 2.63 infections per 1000 catheter-days. With use of the regression model and adjustment for facility characteristics, the rates decreased from 6.42 to 3.33 (incidence rate ratio [IRR], 0.46; 95% CI, 0.36-0.58; P project. Catheter utilization remained unchanged (4.50 at baseline, 4.45 at conclusion of project; IRR, 0

  20. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  1. Community Awareness on Rabies Prevention and Control in Bicol, Philippines: Pre- and Post-Project Implementation

    Directory of Open Access Journals (Sweden)

    Toni Rose M. Barroga

    2018-02-01

    Full Text Available Rabies is endemic in the Philippines. To support the rabies campaign in the Bicol region at the southeastern part of Luzon, the BAI-OIE Stop Transboundary Animal Diseases and Zoonoses (STANDZ Rabies project was implemented in the pilot provinces of Camarines Norte, Camarines Sur, Albay, and Masbate. A community awareness survey was conducted with the residents of these provinces to determine their knowledge, attitude, and practices (KAP on rabies during the start and end of the project. Qualitative, descriptive research was done with a structured KAP questionnaire. Pet owners in the pilot provinces were chosen as respondents. Results showed that respondents know that they can acquire rabies in animals through the bite of a rabid dog (pre-project implementation (PRI: 19.6%, post-project implementation (POI: 38.0%. Vaccination was the top rabies preventive measure (PRI: 61.8%, POI: 92.8%. Biting incidents were noted in some respondents, and observing the dog and killing it immediately were some of the actions taken by bite victims. If a supposed rabid dog was seen, respondents would either: immediately kill the dog (PRI: 20.3%, POI: 13.7%, report it to authorities (PRI: 26.3%, POI: 63.1%, and capture and observe the dog concerned (PRI: 13.5%, POI: 6.0%. Pet owners increased their KAP about rabies prevention and control as compared to the pre-implementation study. However, certain gaps in their KAP need to be given attention; thus continuous education of pet owners must be done.

  2. Implementing CDIO project-based learning in training of Heat and Power engineers

    Science.gov (United States)

    Boiko, E. A.; Shishmarev, P. V.; Karabarin, D. I.; Yanov, S. R.; Pikalova, A. A.

    2017-11-01

    This paper presents the experience and current results of CDIO standards implementation in training of bachelors in Heat and Power Engineering at Thermal Power Stations academic department in Siberian Federal University. It provides information on methodology of modernization of educational programs, curricula and programs of disciplines in transition to CDIO project-based learning technology. Preliminary assessment and analysis of lessons learned and scaling perspectives are given.

  3. IMPACT2C: Quantifying projected impacts under 2°C warming

    Science.gov (United States)

    Jacob, D.; Kotova, L.; Impact2C Team

    2012-04-01

    Political discussions on the European goal to limit global warming to 2°C demand, that information is provided to society by the best available science on projected impacts and possible benefits. The new project IMPACT2C is supported by the European Commission's 7th Framework Programme as a 4 year large-scale integrating project. IMPACT2C is coordinated by the Climate Service Center, Helmholtz-Zentrum Geesthacht. IMPACT2C enhances knowledge, quantifies climate change impacts, and adopts a clear and logical structure, with climate and impacts modelling, vulnerabilities, risks and economic costs, as well as potential responses, within a pan-European sector based analysis. The project utilises a range of models within a multi-disciplinary international expert team and assesses effects on water, energy, infrastructure, coasts, tourism, forestry, agriculture, ecosystems services, and health and air quality-climate interactions. IMPACT2C introduces key innovations. First, harmonised socio-economic assumptions/scenarios will be used, to ensure that both individual and cross-sector assessments are aligned to the 2°C (1.5°C) scenario for both impacts and adaptation, e.g. in relation to land-use pressures between agriculture and forestry. Second, it has a core theme of uncertainty, and will develop a methodological framework integrating the uncertainties within and across the different sectors, in a consistent way. In so doing, analysis of adaptation responses under uncertainty will be enhanced. Finally, a cross-sectoral perspective is adopted to complement the sector analysis. A number of case studies will be developed for particularly vulnerable areas, subject to multiple impacts (e.g. the Mediterranean), with the focus being on cross-sectoral interactions (e.g. land use competition) and cross-cutting themes (e.g. cities). The project also assesses climate change impacts in some of the world's most vulnerable regions: Bangladesh, Africa (Nile and Niger basins), and the

  4. Regional projection of climate impact indices over the Mediterranean region

    Science.gov (United States)

    Casanueva, Ana; Frías, M.; Dolores; Herrera, Sixto; Bedia, Joaquín; San Martín, Daniel; Gutiérrez, José Manuel; Zaninovic, Ksenija

    2014-05-01

    Climate Impact Indices (CIIs) are being increasingly used in different socioeconomic sectors to transfer information about climate change impacts and risks to stakeholders. CIIs are typically based on different weather variables such as temperature, wind speed, precipitation or humidity and comprise, in a single index, the relevant meteorological information for the particular impact sector (in this study wildfires and tourism). This dependence on several climate variables poses important limitations to the application of statistical downscaling techniques, since physical consistency among variables is required in most cases to obtain reliable local projections. The present study assesses the suitability of the "direct" downscaling approach, in which the downscaling method is directly applied to the CII. In particular, for illustrative purposes, we consider two popular indices used in the wildfire and tourism sectors, the Fire Weather Index (FWI) and the Physiological Equivalent Temperature (PET), respectively. As an example, two case studies are analysed over two representative Mediterranean regions of interest for the EU CLIM-RUN project: continental Spain for the FWI and Croatia for the PET. Results obtained with this "direct" downscaling approach are similar to those found from the application of the statistical downscaling to the individual meteorological drivers prior to the index calculation ("component" downscaling) thus, a wider range of statistical downscaling methods could be used. As an illustration, future changes in both indices are projected by applying two direct statistical downscaling methods, analogs and linear regression, to the ECHAM5 model. Larger differences were found between the two direct statistical downscaling approaches than between the direct and the component approaches with a single downscaling method. While these examples focus on particular indices and Mediterranean regions of interest for CLIM-RUN stakeholders, the same study

  5. Health Impact Assessment of an oil drilling project in California

    Directory of Open Access Journals (Sweden)

    Lindsay C. McCallum

    2016-04-01

    Full Text Available Objectives: The Health Impact Assessment (HIA was conducted to evaluate the potential community health implications of a proposed oil drilling and production project in Hermosa Beach, California. The HIA considered 17 determinants of health that fell under 6 major categories (i.e., air quality, water and soil quality, upset conditions, noise and light emissions, traffic, and community livability. Material and Methods: This paper attempts to address some of the gaps within the HIA practice by presenting the methodological approach and results of this transparent, comprehensive HIA; specifically, the evaluation matrix and decision-making framework that have been developed for this HIA and form the basis of the evaluation and allow for a clear conclusion to be reached in respect of any given health determinant (i.e., positive, negative, neutral. Results: There is a number of aspects of the project that may positively influence health (e.g., increased education funding, ability to enhance green space, and at the same time there have been potential negative effects identified (e.g., odor, blowouts, property values. Except for upset conditions, the negative health outcomes have been largely nuisance-related (e.g., odor, aesthetics without irreversible health impacts. The majority of the health determinants, that had been examined, have revealed that the project would have no substantial effect on the health of the community. Conclusions: Using the newly developed methodology and based on established mitigation measures and additional recommendations provided in the HIA, the authors have concluded that the project will have no substantial effect on community health. This approach and methodology will assist practitioners, stakeholders and decision-makers in advancing the HIA as a useful, reproducible, and informative tool.

  6. Health Impact Assessment of an oil drilling project in California.

    Science.gov (United States)

    McCallum, Lindsay C; Souweine, Kathleen; McDaniel, Mary; Koppe, Bart; McFarland, Christine; Butler, Katherine; Ollson, Christopher A

    2016-01-01

    The Health Impact Assessment (HIA) was conducted to evaluate the potential community health implications of a proposed oil drilling and production project in Hermosa Beach, California. The HIA considered 17 determinants of health that fell under 6 major categories (i.e., air quality, water and soil quality, upset conditions, noise and light emissions, traffic, and community livability). This paper attempts to address some of the gaps within the HIA practice by presenting the methodological approach and results of this transparent, comprehensive HIA; specifically, the evaluation matrix and decision-making framework that have been developed for this HIA and form the basis of the evaluation and allow for a clear conclusion to be reached in respect of any given health determinant (i.e., positive, negative, neutral). There is a number of aspects of the project that may positively influence health (e.g., increased education funding, ability to enhance green space), and at the same time there have been potential negative effects identified (e.g., odor, blowouts, property values). Except for upset conditions, the negative health outcomes have been largely nuisance-related (e.g., odor, aesthetics) without irreversible health impacts. The majority of the health determinants, that had been examined, have revealed that the project would have no substantial effect on the health of the community. Using the newly developed methodology and based on established mitigation measures and additional recommendations provided in the HIA, the authors have concluded that the project will have no substantial effect on community health. This approach and methodology will assist practitioners, stakeholders and decision-makers in advancing the HIA as a useful, reproducible, and informative tool. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  7. The Project Towards No Drug Abuse (TND) dissemination trial: implementation fidelity and immediate outcomes.

    Science.gov (United States)

    Rohrbach, Louise Ann; Gunning, Melissa; Sun, Ping; Sussman, Steve

    2010-03-01

    One of the important research issues in the emerging area of research on dissemination of prevention programs relates to the type and extent of training needed by program providers to prepare them to implement effective programs with fidelity. The present paper describes the immediate outcomes of a dissemination and implementation trial of Project Toward No Drug Abuse, an evidence-based prevention program for high school students. A total of 65 high schools in 14 school districts across the USA were recruited and randomly assigned to one of three experimental conditions: comprehensive implementation support for teachers, regular workshop training only, or standard care control. The comprehensive intervention was comprised of on-site coaching, web-based support, and technical assistance, in addition to the regular workshop. Students (n = 2,983) completed self-report surveys before and immediately after program implementation. Fidelity of implementation was assessed with a classroom observation procedure that focused on program process. Results indicated that relative to the controls, both intervention conditions produced effects on hypothesized program mediators, including greater gains in program-related knowledge; greater reductions in cigarette, marijuana and hard drug use intentions; and more positive changes in drug-related beliefs. There were stronger effects on implementation fidelity in the comprehensive, relative to the regular, training condition. However, seven of the ten immediate student outcome measures showed no significant differences between the two training conditions. The implications of these findings for dissemination research and practice are discussed.

  8. The Critical Factors of Scrum Implementation in IT Project - the Case Study

    Directory of Open Access Journals (Sweden)

    Aneta Ozierańska

    2016-07-01

    Full Text Available The paper first presents basic information about the Scrum method. Then it summarizes the state of art in the domain of Scrum implementation, especially as far as the critical factors of its success are concerned. On the basis of literature survey a new model classifying Scrum implementation critical factors is proposed. The model divides Scrum implementation critical factors into five categories: Project Team factors, Psychological and cultural factors, Process and Method, Environment and Technology. The model is then developed and verified using the case study method. The research was carried out in a French IT company by means of a participating observation. The company was implementing Scrum, which ended up as a success. A journal of the Scrum implementation was conducted, presenting the experiences of the Scrum Team, their opinions and changes in the Scrum method which were introduced. On its basis critical factors, crucial for the success of Scrum implementation, classified according to the above mentioned model, were identified, completing those which had been found in the literaturę.

  9. INTEGRATION OF ECONOMIC AND COMPUTER SKILLS AT IMPLEMENTATION OF STUDENTS PROJECT «BUSINESS PLAN PRODUCING IN MICROSOFT WORD»

    Directory of Open Access Journals (Sweden)

    Y.B. Samchinska

    2012-07-01

    Full Text Available In the article expedience at implementation of economic specialities by complex students project on Informatics and Computer Sciences is grounded on creation of business plan by modern information technologies, and also methodical recommendations are presented on implementation of this project.

  10. Using the partial least squares (PLS) method to establish critical success factor interdependence in ERP implementation projects

    OpenAIRE

    Esteves, José; Pastor Collado, Juan Antonio; Casanovas Garcia, Josep

    2002-01-01

    This technical research report proposes the usage of a statistical approach named Partial Least squares (PLS) to define the relationships between critical success factors for ERP implementation projects. In previous research work, we developed a unified model of critical success factors for ERP implementation projects. Some researchers have evidenced the relationships between these critical success factors, however no one has defined in a form...

  11. Evolution of environmental impact assessment as applied to watershed modification projects in Canada

    Science.gov (United States)

    Dirschl, Herman J.; Novakowski, Nicholas S.; Sadar, M. Husain

    1993-07-01

    This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the

  12. Severe accident analysis code Sampson for impact project

    International Nuclear Information System (INIS)

    Hiroshi, Ujita; Takashi, Ikeda; Masanori, Naitoh

    2001-01-01

    Four years of the IMPACT project Phase 1 (1994-1997) had been completed with financial sponsorship from the Japanese government's Ministry of Economy, Trade and Industry. At the end of the phase, demonstration simulations by combinations of up to 11 analysis modules developed for severe accident analysis in the SAMPSON Code were performed and physical models in the code were verified. The SAMPSON prototype was validated by TMI-2 and Phebus-FP test analyses. Many of empirical correlation and conventional models have been replaced by mechanistic models during Phase 2 (1998-2000). New models for Accident Management evaluation have been also developed. (author)

  13. Project Experiences of the Implementation of the Primary Bleed and Feed System

    International Nuclear Information System (INIS)

    Sanz, S.; Lang, J.; Schmid, J.

    2015-01-01

    Modernization activities play a very important role in the enhancement of the safety and reliability of nuclear power plants. The main focus is on increasing the plant availability, the operational flexibility or the integration of new, additional equipment to satisfy safety requirements, as in this case with the implementation of the design modification primary circuit “Primary Bleed & Feed” (PB&F) of the primary circuit, in the consideration of a beyond design basis accident. Primary B&F prevents the high pressure core melt path and allows an additional alternative heat removal by depressurising the primary system and coolant injection with passive and/or active low pressure systems, when the normal core cooling is not available because of loss of water inventory in the steam generators. The goal of this paper is to show some general good practices gained during the implementation of the Primary Bleed and Feed, System from the project conception to the system implementation. Basically, practice shows that some of the crucial factors which contributed to a successful project execution were based on (i) good interface management between the new system and the existing plant components, (ii) a close coordination of the single engineering disciplines and simultaneous activities, (iii) safety culture and quality assurance were set as priority during the entire project development. (author)

  14. The radiological impact of the LEP project on the environment

    International Nuclear Information System (INIS)

    Goebel, K.

    1981-01-01

    The siting of the large electron-positron (LEP) accelerator, its experimental areas, and its supporting infrastructure are discussed with respect to the radiological impact on the surrounding areas and on the population in the Pays de Gex and the Canton de Geneve. The final conclusions are based on work done by the former LEP Study Group and by the LEP Radiation Working Group. The calculations and estimates show that the stray ionizing radiation, the radioactivity, and the radiation-induced noxious chemical products released by the LEP installation will have only an insignificant impact on the area, the individual members of the public, and the population as a whole. This result for LEP 'phase 85' can also be extrapolated under reasonable assumptions for LEP 125 - a possible future development phase of the present project. (orig.)

  15. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them.

  16. PRACTICE OF DRAFTING AND IMPLEMENTING OF FINANCING PROJECTS IN NON-FORMAL EDUCATION

    Directory of Open Access Journals (Sweden)

    BUZOIANU Daniela Angela

    2015-06-01

    Full Text Available In Petroleum and Gas University, besides teaching and research activities, a priority is non-formal education area. In the academic center of Ploiesti, the activities of non-formal education take place through Center for Porjects, Programs and Cultural - Artistic events (CPPECA and Student’s Culture House, located in the University campus (CCS. The mission of the Center for Projects, Programs and Cultural - Artistic events and Student’s Culture House is: - To offer a big diversity of activities in non-formal education area for students and teachers; - To become an essential and defining pillar in continous formation of young people. The purpose is to promote excellence also in non-formal education fied , starting from the value and tradition of university education in Romanian oil area The Center for Project, Programs and Cultural - Artistic events (CPPECA and Student’s House of Culture have: • An educational function; • A real multidirectional cultural vocation through: - initiating,implementing and developing cultural projects and programs; - organizing and developing specific events like shows, festivals, national and international contests. The paper presents practical aspects in development and implementation of financing projects in non-formal education field.

  17. Noxious facility impact projection: Incorporating the effects of risk aversion

    International Nuclear Information System (INIS)

    Nieves, L.A.

    1993-01-01

    Developing new sites for noxious facilities has become a complex process with many potential pitfalls. In addition to the need to negotiate conditions acceptable to the host community, siting success may depend on the facility proposer's ability to identify a candidate site that not only meets technical requirements, but that is located in a community or region whose population is not highly averse to the risks associated with the type of facility being proposed. Success may also depend on the proposer accurately assessing potential impacts of the facility and offering an equitable compensation package to the people affected by it. Facility impact assessments, as typically performed, include only the effects of changes in population, employment and economic activity associated with facility construction and operation. Because of their scope, such assessments usually show a short-run, net economic benefit for the host region, making the intensely negative public reaction to some types and locations of facilities seem unreasonable. The impact component excluded from these assessments is the long-run economic effect of public perceptions of facility risk and nuisance characteristics. Recent developments in psychological and economic measurement techniques have opened the possibility of correcting this flaw by incorporating public perceptions in projections of economic impacts from noxious facilities

  18. Competence raising through teaching of ESD environmental key topics implementingproject technology”

    Directory of Open Access Journals (Sweden)

    Gayane Poghosyan

    2015-06-01

    The UNESCO Chair on “Education for Sustainable Development” at the Center for Ecological-Noosphere Studies of the National Academy of Sciences of the Republic of Armenia in cooperation with the National Institute of Education of the Armenian Ministry of Education and Science are carrying out a series of trainings and seminars for educators and students from pedagogical institutes to increase their competence on key environmental topics in the context of sustainable development implementing project method of teaching. Pedagogical-oriented universities and vocational training institutions have been chosen, where trainings and seminars have been carried out with the best students and the teaching staff using project method. In the result of the trainings and seminars 44 teachers and learners from 5 universities, 3 vocational colleges, 5 high schools, 3 NGOs were trained in 3 regions of the Republic of Armenia (with different environmental problems. Evaluations were carried out and the best tested projects were presented at round table discussions.

  19. Joint implementation - project simulation and organisation. Operationalization of a new instrument of climate policy

    International Nuclear Information System (INIS)

    Luhmann, H.J.; Ott, H.E.; Beuermann, C.; Fischedick, M.; Hennicke, P.; Bakker, L.

    1997-01-01

    The study served to analyze the practical aspects of 'Joint Implementation' (JI) under the Framework Convention on Climate Change, in which measures to reduce greenhouse gas emissions are carried out jointly by several countries. As a first step, possible climate protection measures were assessed with respect to their suitability for JI and an overview of suitable JI projects was compiled. In a further step, carried out in cooperation with partners from industry, four specific projects (coal-fired power plant, solar-thermal power plant, cement factory, least-cost planning) were used to simulate JI. In this work, solutions were developed for the calculation of greenhouse gas emissions avoided as well as for project reporting. In addition, proposals were made with respect to the organizational and institutional design on an international JI mechanism. (orig.) [de

  20. High impact of implementation on school-based smoking prevention

    DEFF Research Database (Denmark)

    Bast, Lotus Sofie; Due, Pernille; Bendtsen, Pernille

    2016-01-01

    prevention trial-the X:IT study. METHODS: A cluster-randomized trial testing is a multi-component intervention to prevent smoking among adolescents in 94 Danish elementary schools (51 intervention, 43 control schools). Participants were grade 7 pupils (mean age 12.5 years). Data was collected by electronic...... into account the complexity of the concept nor the intervention. The objective of the present study was to develop an overall quantitative measure of implementation fidelity, to examine the degree of implementation fidelity and the association of implementation and effect of a randomized school-based smoking...... questionnaires among pupils at baseline (n = 4161), the first follow-up (n = 3764), and the second follow-up (n = 3269) and among school coordinators at intervention schools at the first and second follow-up (50 and 39 coordinators). INTERVENTION: The intervention included three components: (1) smoke-free school...

  1. A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

    OpenAIRE

    Chia-Ling Huang; Rong-Kwei Li; Chih-Hung Tsai; Yi-Chan Chung; Yao-Wen Hsu

    2014-01-01

    Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by...

  2. Patient-centred hand hygiene information in orthopaedics units: an evidence-based implementation project.

    Science.gov (United States)

    Ong, Arielle Yi Jia; Tan, Joanne; Yeo, Hui Ling; Goh, Mien Li

    2017-03-01

    This project aimed to improve patients' knowledge on the importance of hand hygiene. It involved providing patients with a patient and family education on the importance of hand hygiene using a patient information leaflet that introduces the rationale of hand hygiene, possible consequences of poor hand hygiene, and the seven steps of hand hygiene. This projected used a preimplementation and postimplementation audit strategy using the Joanna Briggs Institute Practical Application of Clinical Evidence System and Getting Research Into Practice programs. The implementation occurred in three phases over a period of 6 months from January 2014 to June 2014. The audits took place in two orthopaedic wards in a large acute care setting tertiary hospital in Singapore and involved a sample size of 54 patients. It involved going through the medical records of the cases, assessment of patient knowledge based on the audit criteria, and checking if the patients received the patient information leaflet on hand hygiene. The postimplementation audit found significant improvements in all three audit criteria. The percentage of patients who demonstrated knowledge in the importance of hand hygiene saw an improvement of 48.1%. There was an improvement of 44.5% in nurses' compliance to the documentation of patient education being carried out. The percentage of patients who received a patient information leaflet on hand hygiene saw an increase of 36.1%. This project demonstrated that a preimplementation and postimplementation audit is a viable method to implement change and translate evidence into practice. Through this project, patients gained an understanding on the importance of hand hygiene and could take better ownership of their well being. This may potentially improve hospitalization experience and benefit health outcomes. The positive results of this project are contributed by the enthusiastic involvement of all the stakeholders, from patients and their caregivers to the bedside

  3. Quality of diabetes care worldwide and feasibility of implementation of the Alphabet Strategy: GAIA project (Global Alphabet Strategy Implementation Audit).

    Science.gov (United States)

    Lee, James D; Saravanan, Ponnusamy; Varadhan, Lakshminarayanan; Morrissey, John R; Patel, Vinod

    2014-10-11

    The Alphabet Strategy (AS) is a diabetes care checklist ensuring "important, simple things are done right all the time." Current audits of diabetes care in developed countries reveal wide variations in quality with performance of care processes frequently sub-optimal. This study had three components:• an audit to assess diabetes care quality worldwide,• a questionnaire study seeking opinions on the merits of the AS,• a pilot study to assess the practicality of implementation of the AS in a low socioeconomic setting. Audit data was collected from 52 centres across 32 countries. Data from 4537 patients were converted to Quality and Outcome Framework (QOF) scores to enable inter-centre comparison. These were compared to each country's Gross Domestic Product (GDP), and Total Health Expenditure percentage per capita (THE%). The opinions of diabetes patients and healthcare professionals from the diabetes care team at each of these centres were sought through a structured questionnaire. A retrospective audit on 100 randomly selected case notes was conducted prior to AS implementation in a diabetes outpatient clinic in India, followed by a prospective audit after four months to assess its impact on care quality. QOF scores showed wide variation across the centres (mean 49.0, range 10.2-90.1). Although there was a positive relationship between GDP and THE% to QOF scores, there were exceptions. 91% of healthcare professionals felt the AS approach was practical. Patients found the checklist to be a useful education tool. Significant improvements in several aspects of care as well as 36% improvement in QOF score were seen following implementation. International centres observed large variations in care quality, with standards frequently sub-optimal. 71% of health care professionals would consider adopting the AS in their daily practice. Implementation in a low resource country resulted in significant improvements in some aspects of diabetes care. The AS checklist for

  4. Community-Level Impacts Projection System (CLIPS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Monts, J.K.; Bareiss, E.R.

    1979-02-01

    The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands and spatial location; to estimate how many in-migrating workers will be required; to estimate the demographic characteristics of the in-migrating workers (e.g., how many elementary school children they will bring); to estimate how many additional secondary employment opportunities (e.g., employment in eating and drinking establishments and grocery stores) will be generated; to estimate what the local area's population levels in various age groups would be both with the project and without it; to estimate community population levels for both the impact case and the baseline case; and to estimate the approximate resource requirements and costs for providing additional municipal facilities and services (e.g., water treatment and distribution, wastewater treatment and collection, gas and electric distribution, police and fire protection, etc.)

  5. Psychiatry Morbidity and Mortality Rounds: Implementation and Impact

    Science.gov (United States)

    Goldman, Stuart; Demaso, David R.; Kemler, Beth

    2009-01-01

    Objective: This study assessed the implementation of psychiatry morbidity and mortality rounds (M&Ms) on the clinical and educational practice in a children's hospital. Methods: Attendees to monthly M&Ms between July 2005 and May 2007 included staff and trainees from psychiatry, psychology, nursing, and social work. Cases were selected based on a…

  6. The Internet in the Workplace: Issues of Implementation and Impact.

    Science.gov (United States)

    Anderson, Byron

    1996-01-01

    As the Internet (with pluses and minuses) creeps forward, many work environments, business practices, and consumer processes will change significantly. Manufacturing, electronic commerce, health care, education, environmental monitoring, libraries, and government services will be profoundly affected. Fully implementing the Internet will take…

  7. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  8. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  9. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  10. Projected electricity savings from implementing minimum energy efficiency standard for household refrigerators in Malaysia

    International Nuclear Information System (INIS)

    Mahlia, T.M.I.; Masjuki, H.H.; Saidur, R.; Choudhury, I.A.; NoorLeha, A.R.

    2003-01-01

    The Malaysian economy has grown rapidly in the last two decades. This growth has increased the ownership of household electrical appliances, especially refrigerator-freezers. Almost every house in Malaysia owns a refrigerator-freezer. The Malaysia Energy Center considered implementing a minimum energy efficiency standard for household refrigerator-freezers sometime in the coming year. This paper attempts to predict the amount of energy savings in the residential sector by implementing a minimum energy efficiency standard for household refrigerator-freezers. The calculations are based on the growth of refrigerator-freezer ownership data in Malaysian households. By implementing the programs in 2004, about 8722 GWh will be saved in the year 2013. Therefore, efficiency improvement of this appliance will provide a significant impact in future electricity consumption in Malaysia

  11. Management systems oriented to projects: need for its implementation in sports academic institutions

    Directory of Open Access Journals (Sweden)

    Maidelyn Díaz Pérez

    2017-12-01

    Full Text Available The literature refers to the need that all academic institutions have today to use information systems articulated with the different processes that the organization executes. The idea of using this type of system is to convert the available information into knowledge that represents a competitive advantage for the organization. However, despite being a strength for any organization both to manage their strategic information and to manage the information generated by research projects, they are still not widely used. The reality shows that the academic sports institutions of the country and mainly the faculties of physical culture lack a culture in the use of systems to manage different substantive tasks of the center, such as the activity of research projects. It is estimated that if they rely more on the optimal use of the information and knowledge they have at the group level, all their scientific production indicators will be significantly increased. From this scenario, this research aims to expose the main strengths of information and knowledge management systems, mainly those aimed at projects for the stimulation of their use and implementation in academic institutions associated with sports. To achieve this objective, the logical historical method, direct observation, the method of analysis and synthesis, etc. were used. And among the main results obtained in this research there  is the relevance of the use of information management systems and knowledge aimed at projects to contribute to the promotion and success of research activities generated by projects.

  12. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  13. Problems of Research, Projects and Mechanisms for Their Implementation in Chelyabinsk City Agglomeration

    Science.gov (United States)

    Bolshakov, V. V.

    2017-11-01

    The article analyzes the research and design methods of urban agglomerations in the context of the Chelyabinsk agglomeration from the point of view of correctness, objectivity and consistency of the results obtained. The completed and approved project of the Chelyabinsk agglomeration is analysed to provide architectural and planning solutions for sustainable social and economic development according to the theories that have been formed to date. The possibility of effectuation and implementation of the approved project of the Chelyabinsk agglomeration taking in account existing specific natural, historical and socio-economic factors characteristic for the territory under consideration is examined. The authors draw the conclusions the project of the Chelyabinsk agglomeration has been developed in line with the town-planning solutions that do not reflect modern approaches based on the competitive advantages of territories and do not form a space providing transition to a modernized and innovative economy. Specific town-planning decisions have a weak justification and an undeveloped methodology for pre-project analysis and methodology for designing urban agglomerations because of absence of a full study of the phenomenon of urban agglomeration and processes occurring in it today. It is necessary to continue research in the field of development of the Chelyabinsk agglomeration with the use of a logical and objective methodology to analyze the territory and design which can lead to the formation of an urban-planning information model that reflects all the system processes and allows for predicting project solutions.

  14. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  15. Projecting the Hydrologic Impacts of Climate Change on Montane Wetlands.

    Science.gov (United States)

    Lee, Se-Yeun; Ryan, Maureen E; Hamlet, Alan F; Palen, Wendy J; Lawler, Joshua J; Halabisky, Meghan

    2015-01-01

    Wetlands are globally important ecosystems that provide critical services for natural communities and human society. Montane wetland ecosystems are expected to be among the most sensitive to changing climate, as their persistence depends on factors directly influenced by climate (e.g. precipitation, snowpack, evaporation). Despite their importance and climate sensitivity, wetlands tend to be understudied due to a lack of tools and data relative to what is available for other ecosystem types. Here, we develop and demonstrate a new method for projecting climate-induced hydrologic changes in montane wetlands. Using observed wetland water levels and soil moisture simulated by the physically based Variable Infiltration Capacity (VIC) hydrologic model, we developed site-specific regression models relating soil moisture to observed wetland water levels to simulate the hydrologic behavior of four types of montane wetlands (ephemeral, intermediate, perennial, permanent wetlands) in the U. S. Pacific Northwest. The hybrid models captured observed wetland dynamics in many cases, though were less robust in others. We then used these models to a) hindcast historical wetland behavior in response to observed climate variability (1916-2010 or later) and classify wetland types, and b) project the impacts of climate change on montane wetlands using global climate model scenarios for the 2040s and 2080s (A1B emissions scenario). These future projections show that climate-induced changes to key driving variables (reduced snowpack, higher evapotranspiration, extended summer drought) will result in earlier and faster drawdown in Pacific Northwest montane wetlands, leading to systematic reductions in water levels, shortened wetland hydroperiods, and increased probability of drying. Intermediate hydroperiod wetlands are projected to experience the greatest changes. For the 2080s scenario, widespread conversion of intermediate wetlands to fast-drying ephemeral wetlands will likely reduce

  16. Projecting the Hydrologic Impacts of Climate Change on Montane Wetlands

    Science.gov (United States)

    Hamlet, Alan F.; Palen, Wendy J.; Lawler, Joshua J.; Halabisky, Meghan

    2015-01-01

    Wetlands are globally important ecosystems that provide critical services for natural communities and human society. Montane wetland ecosystems are expected to be among the most sensitive to changing climate, as their persistence depends on factors directly influenced by climate (e.g. precipitation, snowpack, evaporation). Despite their importance and climate sensitivity, wetlands tend to be understudied due to a lack of tools and data relative to what is available for other ecosystem types. Here, we develop and demonstrate a new method for projecting climate-induced hydrologic changes in montane wetlands. Using observed wetland water levels and soil moisture simulated by the physically based Variable Infiltration Capacity (VIC) hydrologic model, we developed site-specific regression models relating soil moisture to observed wetland water levels to simulate the hydrologic behavior of four types of montane wetlands (ephemeral, intermediate, perennial, permanent wetlands) in the U. S. Pacific Northwest. The hybrid models captured observed wetland dynamics in many cases, though were less robust in others. We then used these models to a) hindcast historical wetland behavior in response to observed climate variability (1916–2010 or later) and classify wetland types, and b) project the impacts of climate change on montane wetlands using global climate model scenarios for the 2040s and 2080s (A1B emissions scenario). These future projections show that climate-induced changes to key driving variables (reduced snowpack, higher evapotranspiration, extended summer drought) will result in earlier and faster drawdown in Pacific Northwest montane wetlands, leading to systematic reductions in water levels, shortened wetland hydroperiods, and increased probability of drying. Intermediate hydroperiod wetlands are projected to experience the greatest changes. For the 2080s scenario, widespread conversion of intermediate wetlands to fast-drying ephemeral wetlands will likely reduce

  17. Evaluating the implementation and impacts of middle grades inquiry-based engineering design modules

    Science.gov (United States)

    Harlan, Jessica M.

    This dissertation uses a format where I present and discuss three articles that were written in conjunction with my work on a research and evaluation team. The articles are based on a multi-year project researching and evaluating the design, development, and implementation of a middle grades integrated Science, Technology, Engineering, and Mathematics (STEM) program. Each of the articles demonstrates the complexity in researching and evaluating curricular development in multifaceted, rapidly changing environments. While the focus of each article differs, they all examine research and evaluation in the context of the design and development of middle grades engineering-design modules. The selected articles address challenges associated with assessing program objectives and evaluating program quality in complex education programs.The first article, presented in Chapter 2, provides an overview of the nature of the EYE program and examines the extent to which participation in the EYE program resulted in the achievement of program objectives. There is evidence that EYE Module participation has a positive impact on participating students as well as teachers. This study also revealed challenges associated with determining the impact of program participation simultaneously with program revisions and assessment development. The second article, presented in Chapter 3, examined the evaluation of fidelity of implementation of inquiry-oriented educational programs. This article was intended to examine one way of triangulating information to determine fidelity while considering variation in implementation consistent with program theories of learning. When applying this model to implementation of the EYE program, we found many teachers were implementing the modules with low to moderate fidelity, especially math teachers. The third article, presented in Chapter 4, examined the factor structure of an occupational values scale intended to measure student interest in STEM careers

  18. Development of the evaluation instrument use CIPP on the implementation of project assessment topic optik

    Science.gov (United States)

    Asfaroh, Jati Aurum; Rosana, Dadan; Supahar

    2017-08-01

    This research aims to develop an evaluation instrument models CIPP valid and reliable as well as determine the feasibility and practicality of an evaluation instrument models CIPP. An evaluation instrument models CIPP to evaluate the implementation of the project assessment topic optik to measure problem-solving skills of junior high school class VIII in the Yogyakarta region. This research is a model of development that uses 4-D. Subject of product trials are students in class VIII SMP N 1 Galur and SMP N 1 Sleman. Data collection techniques in this research using non-test techniques include interviews, questionnaires and observations. Validity in this research was analyzed using V'Aikens. Reliability analyzed using ICC. This research uses 7 raters are derived from two lecturers expert (expert judgment), two practitioners (science teacher) and three colleagues. The results of this research is the evaluation's instrument model of CIPP is used to evaluate the implementation of the implementation of the project assessment instruments. The validity result of evaluation instrument have V'Aikens values between 0.86 to 1, which means a valid and 0.836 reliability values into categories so well that it has been worth used as an evaluation instrument.

  19. Napping on the Night Shift: A Two-Hospital Implementation Project

    Science.gov (United States)

    Brown, Jeanne Geiger; Sagherian, Knar; Zhu, Shijun; Wieroniey, Margaret; Blair, Lori; Warren, Joan; Hinds, Pamela; Szeles, Rose

    2015-01-01

    Some nurses who work the night shift experience high levels of sleepiness. Napping has been adopted as an effective countermeasure to sleepiness and fatigue in other safety-sensitive industries but has not had widespread acceptance in nursing. In this two-hospital implementation project, napping was offered to six nursing units where nurse executives had previously approved nap implementation for the night shift as a pilot project. Successful implementation occurred in only one of the six units with partial success in a second unit. Barriers primarily occurred at the point of seeking unit-based nursing leadership approval. On the successful unit, one hundred fifty three 30-minutes naps were taken during the 3-month pilot period. A Nap Experience Survey measured sleepiness prior to the nap, the nap duration and perceived sleep, sleep inertia after the nap, and the perceived helpfulness of the nap. A high level of sleepiness was present at the beginning of 44% of naps. For over half of naps, nurses reported sleeping slightly (43%) or deeply (14%). Sleep inertia was rare (very groggy or sluggish on arising, 1.3%). The average score of helpfulness of napping was high (7.3 on a 1–10 scale). Nurses who napped reported being less drowsy while driving home after their shift. These data suggest that when barriers to napping are overcome, napping on the nightshift is feasible and can reduce sleepiness and drowsy driving in nurses. PMID:27082421

  20. Learning autonomy in writing class: Implementation of project-based learning in english for spesific purposes

    Science.gov (United States)

    Ayu Sukerti, G. N.; Yuliantini, Ny

    2018-01-01

    This research was aimed to analyze students’ attitude on learning autonomy through the implementation of project-based learning (PBL). Writing has been considered one of the most difficult competencies to master as it incorporates several integrated language skills. Thus, teaching writing in English for Specific Class posts a huge challenge as students often feel discouraged by the complex series of processes involved in producing a well-structured piece of writing. This research implemented PBL as the learning model to boost students’ learning outcomes and construct self-directed learning. Participants were 25 second semester students enrolled in a three-year undergraduate program in Informatics Management. The implementation of PBL in writing class contributed real advantages since it allowed students to collaboratively arrange outline in order to produce individual drafts and final essays. The study revealed that students were able to be involved in a more deep and autonomous learning as they helped each other during group discussion. The students autonomously engaged in the completion of the project in a more positive attitude. They also acquired more knowledge in the aspect of grammar and learned how to use language in proper context based on the feedbacks they got during revising their writing.

  1. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  2. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  3. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  4. Effectiveness of Agile Implementation Methods in Business Intelligence Projects from an End-user Perspective

    Directory of Open Access Journals (Sweden)

    Anna Maria Misiak

    2016-06-01

    Full Text Available The global Business Intelligence (BI market grew by 10% in 2013 according to the Gartner Report. Today organizations require better use of data and analytics to support their business decisions. Internet power and business trend changes have provided a broad term for data analytics – Big Data. To be able to handle it and leverage a value of having access to Big Data, organizations have no other choice than to get proper systems implemented and working. However traditional methods are not efficient for changing business needs. The long time between project start and go-live causes a gap between initial solution blueprint and actual user requirements in the end of the project. This article presents the latest market trends in BI systems implementation by comparing Agile with traditional methods. It presents a case study provided in a large telecommunications company (20K employees and the results of a pilot research provided in the three large companies: telecommunications, digital, and insurance. Both studies prove that Agile methods might be more effective in BI projects from an end-user perspective and give first results and added value in a much shorter time compared to a traditional approach.

  5. DIFFICULTIES ENCOUNTERED IN ISO 9001:2008 IMPLEMENTATION PROJECTS IN INCUBATED TECHNOLOGY-BASED COMPANIES

    Directory of Open Access Journals (Sweden)

    Eduardo Gome Salgado

    2014-09-01

    Full Text Available Quality Management Systems (QMS are designed to continuously improve the performance of organizations aiming to constantly improve their services seeking to overcome their results. Thus, for the services and/or products offered to transmit confidence and credibility, they should be designed within appropriate norms and standards. This research aims to assess the difficulties encountered by the incubated companies participating in the PRIME-FINEP project and developing projects for certification of their QMS in accordance with ISO 9001:2008. An exploratory survey was performed in nine incubated technology-based companies (TBC, through a questionnaire with 21 questions totaling the opinion of 20 respondents. After analyzing the data it is concluded, with statistical meaning, that the TBC's with little incubation time present difficulties in implementing the quality policy (5.3, difficulty not identified in other studies conducted in large companies. However difficulties similar to those of the large companies are present in the incubated TBC, and are the following: documentation requirements (4.2 present in all incubated companies (regardless of incubation time, and design and development (7.3 present in companies with little incubation time. The difficulty in implementing the quality policy (5.3 is reflected in the achievement of the QMS certification project in accordance with ISO 9001:2008.

  6. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  7. 76 FR 63346 - Environmental Impact Statement, Tappan Zee Bridge/I-287 Corridor Project (Rockland and...

    Science.gov (United States)

    2011-10-12

    ... review and the State project manager. Because of the current economic realities which severely limit... and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental...

  8. The impact of applying product-modelling techniques in configurator projects

    DEFF Research Database (Denmark)

    Hvam, Lars; Kristjansdottir, Katrin; Shafiee, Sara

    2018-01-01

    This paper aims to increase understanding of the impact of using product-modelling techniques to structure and formalise knowledge in configurator projects. Companies that provide customised products increasingly apply configurators in support of sales and design activities, reaping benefits...... that include shorter lead times, improved quality of specifications and products, and lower overall product costs. The design and implementation of configurators are a challenging task that calls for scientifically based modelling techniques to support the formal representation of configurator knowledge. Even...... the phenomenon model and information model are considered visually, (2) non-UML-based modelling techniques, in which only the phenomenon model is considered and (3) non-formal modelling techniques. This study analyses the impact to companies from increased availability of product knowledge and improved control...

  9. Assessing the impacts of implementing lean construction Evaluando los impactos de la implementación de lean construction

    Directory of Open Access Journals (Sweden)

    Luis F Alarcón

    2008-04-01

    Full Text Available Over the last 10 years an increasing number of companies have implemented lean construction practices in an attempt to improve performance in construction projects. Most companies, and also some researchers, have reported satisfactory results from their implementation. However, there is still a need to provide more extensive analysis of the empirical evidence available to assess the impact of the implementation of lean construction. The authors have researched the implementation of the Last Planner System and other Lean Construction techniques in over one hundred construction projects over the last five years. They have also developed strategies and support tools for implementation. This paper analyzes some of the main impacts observed in the studied projects, and some of the lessons learned from implementations. The paper discusses difficulties and barriers for implementation, productivity improvements, variability reduction and effectiveness of implementation strategies. The paper also provides recommendations for future implementation and researchEn los últimos 10 años un creciente número de empresas constructoras ha implementado prácticas de Lean Construction para mejorar el desempeño de sus proyectos. La mayor parte de estas empresas, y también algunos investigadores, han informado sobre buenos resultados obtenidos en los proyectos. Sin embargo, todavía es necesario un análisis más completo de la evidencia empírica disponible para evaluar así el impacto de Lean Construction en los proyectos y empresas. Los autores han investigado la implementación del Sistema Ultimo Planificador y otras técnicas de Lean Construction en mas de un centenar de proyectos en los últimos 5 años y han desarrollado estrategias y herramientas de apoyo para su implementación. Este artículo analiza algunos de los principales impactos observados en los proyectos estudiados y las lecciones aprendidas en este proceso. Se discuten dificultades y barreras

  10. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  11. The Climaware project: Impacts of climate change on water resources management - regional strategies and European view

    Science.gov (United States)

    Thirel, Guillaume; D'Agostino, Daniela; Démerliac, Stéphane; Dorchies, David; Flörke, Martina; Jay-Allemand, Maxime; Jost, Claudine; Kehr, Katrin; Perrin, Charles; Scardigno, Alessandra; Schneider, Christof; Theobald, Stephan; Träbing, Klaus

    2014-05-01

    Climate projections produced with CMIP5 and applied by the Intergovernmental Panel on Climate Change (IPCC) in its fifth assessment report indicate that changes in precipitation and temperature are expected to occur throughout Europe in the 21th century, with a likely decrease of water availability in many regions. Besides, water demand is also expected to increase, in link with these expected climate modifications, but also due to socio-economic and demographic changes. In this respect, the use of future freshwater resources may not be sustainable from the current water management perspective. Therefore adaptation strategies will most likely be needed to cope with these evolutions. In this context, the main objective of the ClimAware project (2010-2013 - www.uni-kassel.de/fb14/wasserbau/CLIMAWARE/, a project implemented within the IWRM-NET Funding Initiative) was to analyse the impacts of climate change (CC) on freshwater resources at the continental and regional scales and to identify efficient adaptation strategies to improve water management for various socio-economic sectors. This should contribute to a more effective implementation of the Water Framework Directive (WFD) and its instruments (river basin management plans, programmes of measures). The project developed integrated measures for improved freshwater management under CC constraints. More specifically, the objectives of the ClimAware project were to: • elaborate quantitative projections of changes in river flows and consequences such as flood frequency, drought occurrence and sectorial water uses. • analyse the effect of CC on the hydromorphological reference conditions of rivers and therefore the definition of "good status". • define management rules/strategies concerning dam management and irrigation practices on different time perspectives. • investigate uncertainties in climate model - scenario combinations. The research approach considered both European and regional perspectives, to get

  12. Conflict free implementation of strategic project management office at the Entitie level utilizing “Evaporated cloud” diagram

    OpenAIRE

    Oganov, A.; Gogunsky, V.

    2015-01-01

    The analysis of reports on the last researches in area of project management office (PMO) in the organizations is carried out. Comparison of approaches in project management at the entities with PMO of different levels of a maturity and without it is executed. It is shown that the effectiveness of organizations orientation determined by the level of activity on project approaches, implemented with the help of Project Management Office through continuous improvement of design processes and ope...

  13. Implementation of project Safe in Amber. Verification study for SFR 1 SAR-08

    Energy Technology Data Exchange (ETDEWEB)

    Thomson, Gavin; Herben, Martin; Lloyd, Pam; Rose, Danny; Smith, Chris; Barraclough, Ian (Enviros Consulting Ltd (GB))

    2008-03-15

    This report documents an exercise in which AMBER has been used to represent the models used in Project SAFE, a safety assessment undertaken on SFR 1. (AMBER is a flexible, graphical-user-interface based tool that allows users to build their own dynamic compartmental models to represent the migration, degradation and fate of contaminants in an environmental system. AMBER allows the user to assess routine, accidental and long-term contaminant release.) AMBER has been used to undertake assessment calculations on all of the disposal system, including all disposal tunnels and the Silo, the geosphere and several biosphere modules. The near-field conceptual models were implemented with minimal changes to the approach undertaken previously in Project SAFE. Model complexity varied significantly between individual disposal facilities increasing significantly from the BLA to the BTF and BMA tunnels and Silo. Radionuclide transport through the fractured granite geosphere was approximated using a compartment model approach in AMBER. Several biosphere models were implemented in AMBER including reasonable biosphere development, which considered the evolution of the Forsmark area from coastal to lacustrine to agricultural environments in response to land uplift. Parameters were sampled from distributions and simulations were run for 1,000 realisations. In undertaking the comparison of AMBER with the various codes and calculation tools used in Project SAFE it was necessary to undertake a detailed analysis of the modelling approach previously adopted, with particular focus given to the near-field models. As a result some discrepancies in the implementation of the models and documentation were noted. The exercise demonstrates that AMBER is fully capable of representing the features of the SFR 1 disposal system in a safety assessment suitable for SAR-08

  14. Implementation of project Safe in Amber. Verification study for SFR 1 SAR-08

    International Nuclear Information System (INIS)

    Thomson, Gavin; Herben, Martin; Lloyd, Pam; Rose, Danny; Smith, Chris; Barra clough, Ian

    2008-03-01

    This report documents an exercise in which AMBER has been used to represent the models used in Project SAFE, a safety assessment undertaken on SFR 1. (AMBER is a flexible, graphical-user-interface based tool that allows users to build their own dynamic compartmental models to represent the migration, degradation and fate of contaminants in an environmental system. AMBER allows the user to assess routine, accidental and long-term contaminant release.) AMBER has been used to undertake assessment calculations on all of the disposal system, including all disposal tunnels and the Silo, the geosphere and several biosphere modules. The near-field conceptual models were implemented with minimal changes to the approach undertaken previously in Project SAFE. Model complexity varied significantly between individual disposal facilities increasing significantly from the BLA to the BTF and BMA tunnels and Silo. Radionuclide transport through the fractured granite geosphere was approximated using a compartment model approach in AMBER. Several biosphere models were implemented in AMBER including reasonable biosphere development, which considered the evolution of the Forsmark area from coastal to lacustrine to agricultural environments in response to land uplift. Parameters were sampled from distributions and simulations were run for 1,000 realisations. In undertaking the comparison of AMBER with the various codes and calculation tools used in Project SAFE it was necessary to undertake a detailed analysis of the modelling approach previously adopted, with particular focus given to the near-field models. As a result some discrepancies in the implementation of the models and documentation were noted. The exercise demonstrates that AMBER is fully capable of representing the features of the SFR 1 disposal system in a safety assessment suitable for SAR-08

  15. Implementing pharmacogenomics decision support across seven European countries: The Ubiquitous Pharmacogenomics (U-PGx) project.

    Science.gov (United States)

    Blagec, Kathrin; Koopmann, Rudolf; Crommentuijn-van Rhenen, Mandy; Holsappel, Inge; van der Wouden, Cathelijne H; Konta, Lidija; Xu, Hong; Steinberger, Daniela; Just, Enrico; Swen, Jesse J; Guchelaar, Henk-Jan; Samwald, Matthias

    2018-02-09

    Clinical pharmacogenomics (PGx) has the potential to make pharmacotherapy safer and more effective by utilizing genetic patient data for drug dosing and selection. However, widespread adoption of PGx depends on its successful integration into routine clinical care through clinical decision support tools, which is often hampered by insufficient or fragmented infrastructures. This paper describes the setup and implementation of a unique multimodal, multilingual clinical decision support intervention consisting of digital, paper-, and mobile-based tools that are deployed across implementation sites in seven European countries participating in the Ubiquitous PGx (U-PGx) project. © The Author(s) 2018. Published by Oxford University Press on behalf of the American Medical Informatics Association.

  16. Implementing a Systematic Process for Consistent Nursing Care in a NICU: A Quality Improvement Project.

    Science.gov (United States)

    McCarley, Renay Marie; Dowling, Donna A; Dolansky, Mary A; Bieda, Amy

    2018-03-01

    The global aim of this quality improvement project was to develop and implement a systematic process to assign and maintain consistent bedside nurses for infants and families. A systematic process based on a primary care nursing model was implemented to assign consistent care for a 48-bed, single-family room NICU. Four PDSA cycles were necessary to obtain agreement from the nursing staff as to the best process for assigning primary nurses. Post-intervention data revealed a 9.5 percent decrease of consistent caregivers for infants in the NICU ≤ 28 days and a 2.3 percent increase of consistent caregivers for infants in the NICU ≥ 29 days. Although these findings did not meet the goal of the specific aim, a systematic process was created to assign bedside nurses to infants. Further PDSAs will be needed to refine the process to reach the aim.

  17. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    International Nuclear Information System (INIS)

    Joyner, William Scott; Knight, Mark A.

    2013-01-01

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information

  18. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    Energy Technology Data Exchange (ETDEWEB)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  19. The iMPACT project tracker and calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Mattiazzo, S., E-mail: serena.mattiazzo@pd.infn.it [Dipartimento di Ingegneria dell' Informazione, Università di Padova, Padova (Italy); Bisello, D. [Dipartimento di Fisica e Astronomia, Università di Padova, Padova (Italy); INFN Sezione di Padova, Padova (Italy); Giubilato, P. [Dipartimento di Fisica e Astronomia, Università di Padova, Padova (Italy); INFN Sezione di Padova, Padova (Italy); CERN, Geneve (Switzerland); Pantano, D.; Pozzobon, N. [Dipartimento di Fisica e Astronomia, Università di Padova, Padova (Italy); INFN Sezione di Padova, Padova (Italy); Snoeys, W. [CERN, Geneve (Switzerland)

    2017-02-11

    In recent years the use of hadrons for cancer radiation treatment has grown in importance, and many facilities are currently operational or under construction worldwide. To fully exploit the therapeutic advantages offered by hadron therapy, precise body imaging for accurate beam delivery is decisive. While traditional X-ray Computed Tomography (xCT) fails in providing 3D images with the precision required for hadrons treatment guidance, Proton Computer Tomography (pCT) scanners, currently in their R&D phase, can. A pCT scanner consists of a tracker system, to track protons, and of a calorimeter, to measure their residual energy. In this paper we will present the iMPACT project, which foresees a novel proton tracking detector with higher scanning speed, better spatial resolution and lower material budget with respect to present state-of-the-art detectors, leading to enhanced performances. The tracker will be matched to a fast, highly segmented proton range calorimeter.

  20. The importance of cultural aspects in impact assessment and project: developmentreflections from a case study of a hydroelectric dam in Brazil

    NARCIS (Netherlands)

    Hanna de Almeida Oliveira, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2016-01-01

    Failure to consider the cultural and social factors of projects can lead to situations where mitigation does not effectively address the impacts they were intended to alleviate, and can even create other impacts. We critically analyse the processes of designing and implementing a social and

  1. Economic and ecological advantages of innovative project implementation at woodworking industry

    Directory of Open Access Journals (Sweden)

    Irina N. Yepifanova

    2015-03-01

    Full Text Available Orientation to innovative development involves the strategic focus onto manufacturing high-tech products in the priority sectors of the economy. Implementation of innovative projects aimed at reducing the energy component in overall costs of enterprise is demanded and necessary. The aim of the research is to prove the economic and ecological benefits of using at domestic wood industry enterprises the wood pellets as an alternative biofuel. The main economic indicators of the project for the pellets production presented indicate the expenses-to-profits ratio; studied is the cost of season heating in Ukraine of 1000 m2 with both traditional and alternative fuels. Noted is that the use of pellets as ecological biofuel is more economical in comparison with electricity and gas. Exposed are the economic benefits of the pellet boiler heating by different fuels.

  2. European dimension of the implementation of the IAEA TC model project 'Upgrading radiation protection infrastructure'

    International Nuclear Information System (INIS)

    Sabol, J.

    2001-01-01

    A comprehensive evaluation carried out by the IAEA during the period 1984-1995 showed that eleven countries in Europe -- Albania, Armenia, Belarus, Bosnia and Herzegovina, Cyprus, Estonia, Georgia, Latvia, Lithuania, the Republic of Moldova, The Former Yugoslav Republic (TFYR) of Macedonia -- did not have a satisfactory system for radiation protection and the safety of radiation sources in accordance with the recommended international requirements. During the past four years, these countries have been participating in a Model Project aimed at upgrading radiation protection infrastructure in the Europe region with special emphasis on the establishment of an effective legal framework for adequate regulatory control of radiation sources and facilities. This paper analyses the results accomplished in the implementation of this project. It presents the main objectives, based on the present achievements for a follow-up programme to be carried out in participating and also in some other Member States with insufficient national infrastructures for assuring adequate safety in nuclear and radiation technologies. (author)

  3. ON EXPERIENCE OF THE COLLABORATION AND PROJECT MANAGEMENT INFORMATION SYSTEM PODIO IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    Andrii V. Semenets

    2014-12-01

    Full Text Available The Information Technologies role in the medical university management is analyzed. The importance of the application of the electronic document management in the medical universities is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. A Podio collaboration and project management cloud service features overview is presented. The methodology of the Podio capabilities usage to the medical university task management solving is developed. An approaches to the Podio Workspaces and Applications development for the faculties collaboration and project management in the departments of the medical universities are presented. The examples of the Podio features usage to the work-flow automation of the information-analytical and hardware and software support departments of the Ternopil State Medical University named after I. Ja. Horbachevsky are shown.

  4. Design and implementation of real-time wireless projection system based on ARM embedded system

    Science.gov (United States)

    Long, Zhaohua; Tang, Hao; Huang, Junhua

    2018-04-01

    Aiming at the shortage of existing real-time screen sharing system, a real-time wireless projection system is proposed in this paper. Based on the proposed system, a weight-based frame deletion strategy combined sampling time period and data variation is proposed. By implementing the system on the hardware platform, the results show that the system can achieve good results. The weight-based strategy can improve the service quality, reduce the delay and optimize the real-time customer service system [1].

  5. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  6. Project-Based Emissions Trading. The Impact of Institutional Arrangements on Cost-Effectiveness

    International Nuclear Information System (INIS)

    Woerdman, E.; Van der Gaast, W.

    2001-01-01

    In this paper we demonstrate that the institutional arrangement (or: design) of Joint Implementation (JI) and the Clean Development Mechanism (CDM) has a decisive impact on their cost-effectiveness. We illustrate our arguments by statistically analyzing the costs from 94 Activities Implemented Jointly (AIJ) pilot phase projects as well as by adjusting these data on the basis of simple mathematical formulas. These calculations explicitly take into account the institutional differences between JI (sinks, no banking) and the CDM (banking, no sinks) under the Kyoto Protocol and also show the possible effects on credit costs of alternative design options. However, our numerical illustrations should be viewed with caution, because AIJ is only to a limited extent representative of potential future JI and CDM projects and because credit costs are not credit prices. Some of the main figures found in this study are: an average cost figure per unit of emission reduction for AIJ projects of 46 dollar per ton of carbon dioxide equivalent ($/Mg CO 2 -eq), an average potential JI credit cost figure which is lowered to 37 $/Mg CO 2 -eq by introducing banking and an average of 6 $/Mg CO 2 -eq per credit for potential low-cost CDM projects which includes sinks. However, at CoP6 in November 2000 in The Hague (The Netherlands), the Parties to the Framework Convention on Climate Change (FCCC) did not (yet) reach consensus on the institutional details of the project-based mechanisms, such as the possible arrangement of early JI action or the inclusion of sinks under the CDM. 55 refs

  7. [Implementation of the eLearning project NESTOR. A network for students in traumatology and orthopedics].

    Science.gov (United States)

    Back, D A; Haberstroh, N; Hoff, E; Plener, J; Haas, N P; Perka, C; Schmidmaier, G

    2012-01-01

    Modern internet-based information technologies offer great possibilities to create and improve teaching methods for students. The eLearning tool NESTOR (Network for Students in Traumatology and Orthopedics) presented here was designed to complement the existing clinical teaching in orthopedics and traumatology at the Charité, University Medicine Berlin. Using a learning management system, videos, podcasts, X-ray diagnosis, virtual patients, tests and further tools for learning and study information were combined. After implementation the eLearning project was evaluated by students. The NESTOR project offers various possibilities for knowledge acquisition. Students using the program voluntarily showed a high acceptance whereby 82.4% were very satisfied with the contents offered and 95.3% supported the idea of a future use of NESTOR in teaching. The blended learning approach was positively evaluated by 93.5% of the students. The project received the eLearning seal of quality of the Charité University Medicine Berlin. Using complex eLearning tools, such as the NESTOR project represents a contemporary teaching approach in the teaching of traumatology and orthopedics and should be offered in a blended learning context as they are well accepted by students.

  8. Basic survey for Joint Implementation on Jinling Petrochemical Corporation, China. Energy conservation project for Nanjing Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, the basic survey was conducted on potential energy conservation at Nanjing Refinery, Jiangsu Nanjing city, China. Investigational studies were made on the repair of the power recovery system in line with the plan to enlarge the fluid catalytic cracker (FCC) and the power recovery using exhaust gas from the RFCC catalytic regeneration system. Moreover, the energy conservation technology to reduce power loads of the refining system was adopted to this project. As a result, it was found out that this repair plan makes recovery of the power equivalent to 10.6MW possible and produces the effect of reducing the fuel to be used. The realization of this project brings the CO2 reduction amount of approximately 70,000 t/y. It was also found out that this project not only reduces a large amount of greenhouse effect gas emissions, but contributes to profits of the plant concerned and helps improve the environment in the area concerned. For the implementation of this project, the detailed plan is expected to be further discussed. (NEDO)

  9. A Case Study on the Implementation of a Positive Youth Development Program (Project P.A.T.H.S. in Hong Kong: Learning from the Experimental Implementation Phase

    Directory of Open Access Journals (Sweden)

    Tak Yan Lee

    2008-01-01

    Full Text Available This investigation of the implementation of a positive youth development program (Project P.A.T.H.S. was part of a large study undertaken comprehensively to explore how effective the Tier 1 Program was in practice and how the results can shed light on future developments. Utilizing a case study approach, individual and focus group interviews were conducted in 2007 to examine the factors that influence the process and quality of implementation of the Tier 1 Program of the Project P.A.T.H.S. The focus of this study was on how the implementers of a school made use of the experience gained in the Experimental Implementation Phase (EIP in 2005/06 to improve the program implementation quality in the Full Implementation Phase (FIP in 2006/07. Results showed that the program implementation in the FIP was generally high and the program was well received by the implementers. Factors that facilitated the implementation of the program were identified, including the adoption of an incremental change strategy, the incorporation of the program into both formal and informal curricula, positive perceptions of the program among staff and agency social workers, sufficient school administrative support, excellent cooperation between the school and the social work agency, presence of a dedicated school contact person and instructors who engaged themselves in continuous quality improvement of the implementation, and an emphasis on application of what had been learned. Difficulties encountered by the school in the process of implementation were also observed. Based on the present findings, key process variables that facilitate or impede the implementation of positive youth development programs are discussed. Implications for future program implementation are also discussed.

  10. Implementation of Agile project management in spent nuclear fuel characterization process

    International Nuclear Information System (INIS)

    Vinas Pena, P.

    2015-01-01

    Full text of publication follows. Spent nuclear fuel characterization (SNFC) is a complex process that covers different areas of analysis and whose final goal is to provide an accurate description of spent nuclear fuel (SNF) status for its future classification for storage and transport. The need to reduce the SNFC processing time maintaining the quality of the product has motivated ENUSA to research and implement Agile project management and human performance techniques. The Agile management techniques are focused in accommodate changes or new requirements in the project during the elaboration process without suffering delays or lose of quality. For its SNF projects ENUSA uses 2 complementary techniques: SCRUM and Kanban. SCRUM methodology is based on divide the process into activities blocks. Each block is a finished part of the final product which allows periodical deliveries of the product and the easy introduction of changes if they are necessary. The characterization process is formed by blocks of activities based on different analysis for every fuel assembly as the existence of leaking rods; the analysis of the structural integrity considering the existence of missing rods, broken or missing grids or grid straps or grid springs...; the corrosion phenomenon on the rod that could affect its integrity during the storage and transport; the burnup of the fuel assembly; the analysis of the rod internal pressure and its effect on rod failure mechanism as creep or on the material embrittlement due to the radial hydride precipitation; the compatibility with the container to avoid operational problems during cask loading and unloading, and any new input based on the regulatory evolution and the industry state of the art. The different analysis can be developed at the same time as they are independent. Kanban methodology consists in a visual representation of the evolution of the process. In a chart, the different activities needed to perform any of the analysis

  11. Measuring efficiency of lean six sigma project implementation using data envelopment analysis at Nasa

    Directory of Open Access Journals (Sweden)

    David Meza

    2013-06-01

    Full Text Available Purpose: This study aims to review the implementation of the Lean Six Sigma project methodology in the Johnson Space Center (JSC business environment of National Aeronautics and Space Administration (NASA with an objective of evaluating performance of individual projects and to develop recommendation for strategies to improve operational efficiencies based on Data Envelopment Analysis (DEA.Design/methodology/approach: In this study, authors propose the Lean Six Sigma project performance evaluation model (LSS-PPEM based on Data DEA where Critical Success Factors (CSFs and Total Team Hours serve as inputs while Process Sigma and Cost avoidance are used as outputs. The CSFs are factors that critically affect the performance of LSS at JSC. Six of those are identified by the Black Belts through Analytical Hierarchical Process, and the values of those are decided by project leaders and Green Belts through survey. Eighteen LSS projects are evaluated, and their results are analyzed.Findings and Originality/value: Eventually, four out of the six CSFs are adopted for this study based upon Pearson correlation analysis, and those four include Project execution and follow up of results; Top management’s commitment and participation; The use of data analysis with easily obtainable data; Attention given to both long and short term targets. Using data between the years 2009 and 2011, seven of the eighteen projects are found to be efficient. The benchmark analysis and slack analysis are conducted to provide further recommendation for JSC managers. Three out of those seven efficient projects are most frequently used as an efficient peer.Practical implications: Traditionally, DEA has been considered as a data-driven approach. In this study, authors incorporate the survey-based CSFs into the DEA frame. Since many organizations may have different CSFs, the framework presented in this study can be easily applied to other organizations.Originality/value: This study

  12. The Impact of Law on Syndromic Disease Surveillance Implementation.

    Science.gov (United States)

    Purtle, Jonathan; Field, Robert I; Hipper, Thomas; Nash-Arott, Jillian; Chernak, Esther; Buehler, James W

    Legal environments influence how health information technologies are implemented in public health practice settings. Syndromic disease surveillance (SyS) is a relatively new approach to surveillance that depends heavily on health information technologies to achieve rapid awareness of disease trends. Evidence suggests that legal concerns have impeded the optimization of SyS. To (1) understand the legal environments in which SyS is implemented, (2) determine the perceived legal basis for SyS, and (3) identify perceived legal barriers and facilitators to SyS implementation. Multisite case study in which 35 key informant interviews and 5 focus groups were conducted with 75 SyS stakeholders. Interviews and focus groups were audio recorded, transcribed, and analyzed by 3 coders using thematic content analysis. Legal documents were reviewed. Seven jurisdictions (5 states, 1 county, and 1 city) that were purposively selected on the basis of SyS capacity and legal environment. Health department directors, SyS system administrators, legal counsel, and hospital personnel. Federal (eg, HIPAA) and state (eg, notifiable disease reporting) laws that authorize traditional public health surveillance were perceived as providing a legal basis for SyS. Financial incentives for hospitals to satisfy Meaningful Use regulations have eased concerns about the legality of SyS and increased the number of hospitals reporting SyS data. Legal issues were perceived as barriers to BioSense 2.0 (the federal SyS program) participation but were surmountable. Major legal reforms are not needed to promote more widespread use of SyS. The current legal environment is perceived by health department and hospital officials as providing a firm basis for SyS practice. This is a shift from how law was perceived when SyS adoption began and has policy implications because it indicates that major legal reforms are not needed to promote more widespread use of the technology. Beyond SyS, our study suggests that

  13. Impact of Redevelopment Projects on Waste Water Infrastructure

    Science.gov (United States)

    Bhave, Prashant; Rahate, Sarvesh

    2018-05-01

    In the last few decades there has been a tremendous increase in urban population globally. Metropolitan cities in India are experiencing rapid change in their population due to migration from rural to urban areas. Due to limited land Mumbai city is experiencing vertical growth in the form of redevelopment projects, signifying a change in population density. Wastewater collection systems greatly contribute to the cost of the overall municipal sewerage system. Present study is an attempt to understand the impact of the redevelopment activities on the wastewater infrastructure. Existing sewerage network of an urban area in Central Mumbai was redesigned and analysed for four different planning scenarios with Bentley's SewerGEM. Results have shown significant change in diameters of the conduits within the sewer network, thus making it inefficient by 13, 19, 31 and 42% with each changing scenario. The results and analysis derived from the study are significant with respect to the urban town planners, developing solutions in alleviating the rising problem of sewer overflows and the economic impact being caused.

  14. Environmental impacts of the extraction of forestry residues. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Brierley, E.; Truckell, I.; Brewer, T.; Towers, W.; Malcolm, A.; Walker, W.

    2004-07-01

    The environmental implications of the changes in forestry operations and practices necessary to remove significant quantities of forest residues for use as a fuel were investigated in this study commissioned by the UK Department of Trade and Industry. The project involved: a review of current practices for the treatment of residues and the production of wood fuels in Great Britain; an assessment of the impact of these practices on soils, landscape, water, flora, fauna and air; and the modelling of scenarios to identify the quantity of forestry land from which residues could be obtained to help meet UK targets for the use of renewable energy. This allowed an assessment of how practices may develop and how environmental impacts may change as a result of increased removal of forestry residues. The study included a literature review, discussions with the forestry and biomass industries and the selection of case study areas with a range of soil types. Differences in opportunities for residue harvesting between upland forestry in the north and west of the UK and lowland forestry in the south of the UK were highlighted by the model outputs.

  15. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2013-01-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences and lessons learned with policymakers, project developers and stakeholders, with the objective to inform forest project and strategy development. It presents experiences and advice on the risks, costs and revenues of forest projects, thereby informing not only the development of future REDD+ initiatives but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private financial institutions and comparable with other investment opportunities. It is therefore important to include robust analysis of the operations business case and its financial attractiveness to commercial investors, early in the design process. As for the economics of forest and forest carbon projects, it appears that REDD+ payments alone, especially at current prices, will not deliver the revenues that cover all expenses of transparent and long-term mitigation of forest carbon emissions. Instead the findings underline the importance of building up forest operations which effectively manages risk and delivers several revenue streams. These findings are aligned with the advocacy efforts of UNEP and the UN-REDD Programme on multiple benefits and the combination of various funding and

  16. Renewable energy supply systems in Indonesia. The Activities Implemented Jointly (AIJ) project of the E7 initiative. A case study

    Energy Technology Data Exchange (ETDEWEB)

    Betz, R.

    1999-02-01

    The Renewable Energy Supply System Project, short RESS project, is an Activities Implemented Jointly (AIJ) project carried out by the E7-Initiative combining eight of the world's largest electric utilities of G7 countries (RWE AG Germany is the main coordinator of this project). The first part of the chapter gives a description of the project's background, organisation and different components including the financial aspects and the present state of implementation of the RESS project. The second part presents the evaluation of the project: on the one hand primary objectives will be analysed from the investor's view, on the other hand secondary objectives from a more development co-operation and political point of view. In the final part general problems and especially problems relevant to the further development of the Clean Development Mechanism (CDM) will be summed up. (orig.)

  17. Measuring the socio-economic impacts of agroforestry projects in the Philippines

    Science.gov (United States)

    Evan Mercer; Belita Vega; Hermie Francisco; Robin Maille

    1994-01-01

    Conventional wisdom suggests that agroforestry projects can provide both ecological and economic benefits. Most agroforestry project evaluations, however, have failed to adequately assess the soci0-economic impacts. For example, a review of 108 agroforestry project impact evaluations by Sara Scherr of IFPRJ reported that only 8% assessed economic costs or benefits, 5%...

  18. Evaluating the Impact of Regional Marketing Projects on the Development of Regions from Different Stakeholder Perspectives

    Directory of Open Access Journals (Sweden)

    Kunze Kim-Kathrin

    2014-01-01

    Full Text Available In the competition for economically attractive stakeholders, regions have to implement strategies to gain and adhere those interest groups. Empirical studies concerning the migration motivations show that it is not only labor market but also soft locational factors of the social environment, nature and landscape that are of high importance: A majority of the population is willing to move or rather stay at a special place because of such soft locational factors. This study examines the impact of regional marketing projects on the development of regions from the perspectives of inhabitants and tourists as well as general attributes to measure a region’s attractiveness from the perspective of high potentials. We argue that those projects that fit to the region and its unique selling propositions contribute to positioning and building location brand value. We show that projects have a socio-economic effect on the attitude towards regions and contribute to building location brand value. An analysis of group differences shows that the project influence on the region and region attractiveness are perceived in significantly different manner depending on the knowledge level of the stakeholder group. Consequently, one should increase the awareness of marketing activities and regions and focus on soft locational factors while establishing and positioning a region brand.

  19. Discussion after implementation of possible ergonomics contributions in production lines automation project

    Directory of Open Access Journals (Sweden)

    José Adriano Canton

    2016-11-01

    Full Text Available This paper addresses the issue of work spaces designed based on Activity-Centered Ergonomics. The aim was to reflect on the role of Ergonomics in the design of productive situations in order to anticipate and mitigate the emergence of new constraints. This study was developed using a case study from the packaging industry, where an automated line was implemented to mitigate the injuries suffered as result of the manual system. This article was based on the results of an Ergonomic Work Analysis of the solution implemented, and the subsequent analysis of this design process. It was found that the adopted solution does not have enough leeway for dealing with variations inherent to the process, requiring constant interventions in the operation, by the operators in order to free the line to continue work. It was evident that the adopted solution did not involve the participation of important agents such as the operators and the maintenance crew, giving the project a technical vision that was concerned with eliminating the human factor. The conclusion of this study was that the Ergonomics integrated into the project development favors the collective construction of analysis of the research, and consequently, the development of more effective solutions.

  20. The e7 guide to implementing projects under the Clean Development Mechanism

    International Nuclear Information System (INIS)

    2003-09-01

    The e7 was formed in 1992 to play an active role in global electricity issues and to promote sustainable development. It consists of nine leading electricity companies: American Electric Power (United States), Electricite de France (France), ENEL (Italy), Hydro-Quebec (Canada), The Kansai Electric Power Company, Inc. (Japan), Ontario Power Generation, Inc. (Canada), RWE (Germany), ScottishPower (United Kingdom), and Tokyo Electric Power Company (Japan). This report provides a guide to help develop projects under the Clean Development Mechanism (CDM), which is an instrument that allows public or private entities to invest in greenhouse gas (GHG) mitigating activities in developing countries and earn credits in an emission trading system. The dual objectives of the CDM, one of three mechanisms set out in the Kyoto Protocol, are the reduction of global GHG emissions and a contribution to sustainable development in the host country. The guidelines and procedures detailed by the United Nations Framework Convention on Climate Change (UN FCCC) and the related Protocols and Accords, were followed in the preparation of this document. Recommendations based on e7 experience were also included. The criteria for success were stated, and additionality was discussed. Additionality refers to the reductions of emissions that are additional to any that would occur in the absence of the certified project activity. The baseline methodology was described. Project Design Document (PDD) is the format that must be used for presenting the information pertaining to a project and its evaluation. PDD contents include: general description of the project activity, baseline methodology, identification of crediting period, monitoring methodology and plan, calculation of GHG emissions by sources, environmental impacts, and stakeholder comments. Third party verification, and project risk and transaction costs were also addressed. refs., tabs., figs

  1. Method of computer generation and projection recording of microholograms for holographic memory systems: mathematical modelling and experimental implementation

    International Nuclear Information System (INIS)

    Betin, A Yu; Bobrinev, V I; Evtikhiev, N N; Zherdev, A Yu; Zlokazov, E Yu; Lushnikov, D S; Markin, V V; Odinokov, S B; Starikov, S N; Starikov, R S

    2013-01-01

    A method of computer generation and projection recording of microholograms for holographic memory systems is presented; the results of mathematical modelling and experimental implementation of the method are demonstrated. (holographic memory)

  2. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  3. Quality and Safety Assurance - Priority Task at Nuclear Power Projects Implementation

    International Nuclear Information System (INIS)

    Nenkova, B.; Manchev, B.; Tomov, E.

    2010-01-01

    Quality and safety assurance at implementation of nuclear power engineering projects is important and difficult task for realization. Many problems arise during this process, when many companies from different countries participate, with various kinds of activities and services provided. The scope of activities necessary for quality and safety assurance is therefore quite expanded and diverse. In order to increase the safety and reliability of Kozloduy NPP Plc (KNPP) Units 5 and 6, as well as to bring the units in conformity with the newest international requirements for quality and safety in the field of nuclear energy, a program for their modernization on the basis of different technical studies and assessments was implemented. The Units 5 and 6 Modernization Program of Kozloduy Nuclear Power Plant was composed of 212 modifications aimed to improve the safety, operability, and reliability of the Units. The Program was realized by stages during yearly planned outages since year 2002 to 2007, without additional outages. A major Program Objective was to extend the Units Life Time in at least 15 Years, under a continuous, safe, and reliable operation. The Modernization Program of Units 5 and 6 of the Bulgarian Nuclear Power Plant in Kozloduy was the first and for the time being the only one in the world, program in the field of nuclear power engineering, by which the full scope of recommendations for improvement of the Kozloduy NPP units was applied. The main goal of the National Electric Company, which is the Employer for the construction of new nuclear facility in Bulgaria, is after completion of all activities regarding construction of Belene NPP the plant to meet or exceed the requirements of the respective national and international quality and safety codes and standards, as well as the IAEA guidelines, as they are established. The objective of this report is to describe different aspects of the quality assurance according to the requirements of quality and

  4. Hierarchical biodiversity and environment impact assessment of South-to-North Water Diversion Project of China

    OpenAIRE

    Youhua Chen

    2013-01-01

    In this brief review, the potential environmental and biodiversity impact of South-to-North Water Diversion (SNWD) project in China on regional environments was assessed. I used the hierarchical environmental impact assessment to classify the possible impacts into three orders caused by the construction of SNWD and then presented the current research advances on each order of the impacts. Further impact assessments should be reinforced during the construction period of SNDW project for the su...

  5. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  6. Landslide risk impact management and web services for improving resilience: the LIFE+IMAGINE project approach

    Science.gov (United States)

    Congi, Maria Pia; Campo, Valentina; Cipolloni, Carlo; Delmonaco, Giuseppe; Guerrieri, Luca; Iadanza, Carla; Spizzichino, Daniele; Trigila, Alessandro

    2014-05-01

    The increasing damage caused by natural disasters in the last decades points out the need for interoperable added-value services to support environmental safety and human protection, by reducing vulnerability of exposed elements as well as improving the resilience of the involved communities. For this reason, to provide access to harmonized and customized data is only one of several steps towards delivering adequate support to risk assessment, reduction and management. Scope of the present work is to illustrate a methodology under development for analysis of potential impacts in areas prone to landslide hazard in the framework of the EC project LIFE+IMAGINE. The project aims to implement an infrastructure based on web services for environmental analysis, that integrates in its own architecture specifications and results from INSPIRE, SEIS and GMES. Existing web services will be customized during the project to provide functionalities for supporting the environmental integrated management. The implemented infrastructure will be applied to landslide risk scenarios, to be developed in selected pilot areas, aiming at: i) application of standard procedures to implement a landslide risk analysis; ii) definition of a procedure for assessment of potential environmental impacts, based on a set of indicators to estimate the different exposed elements with their specific vulnerability in the pilot area. More in detail, the landslide pilot will be aimed at providing a landslide risk scenario through the implementation and analysis of: 1) a landslide inventory from available historical databases and maps; 2) landslide susceptibility and hazard maps; 3) assessment of exposure and vulnerability on selected typologies of elements at risk; 4) implementation of a landslide risk scenario for different sets of exposed elements (e.g. population, road network, residential area, cultural heritage). The pilot will be implemented in Liguria, Italy, in two different catchment areas located

  7. Socio-economic impacts - an overview based on coal mining projects

    International Nuclear Information System (INIS)

    Singh, V.K.

    1994-01-01

    Socio-economic impacts of coal projects have assumed importance as new projects are affecting tribal/underdeveloped areas. The paper highlights the impacts on land uses and on life and culture of the habitats. It assesses socio-economic impacts and furnishes financial implications of rehabilitation. Some suggestions have also been given to neutralize the stresses developed due to development of coal fields

  8. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  9. Impact on cost accuracy and profitability from implementing product configuration system – A case-study

    DEFF Research Database (Denmark)

    Myrodia, Anna; Kristjansdottir, Katrin; Hvam, Lars

    2015-01-01

    This article aims at analyzing the impacts from implementing a product configuration system (PCS) on company profitability and improved cost estimations in the sales phase. Companies that have implemented PCSs have achieved substantial benefits in terms of being more in control of their product...... assortment, making the right decisions in the sales phase and increased sales of optimal products. Those benefits should have direct impact on improved profitability in terms of increased contribution ratios and more accurate cost estimations used to determine the price in the budgetary quotations...... and accuracy of the cost estimation in the sales phase can be achieved from implementing a PCS....

  10. 76 FR 62144 - Environmental Impact Statement for Implementation of Passenger Rail Service Between Tucson, AZ...

    Science.gov (United States)

    2011-10-06

    ... impacts to the natural and built environment of those alternatives, and invite public participation in the... will provide programmatic assessment of environmental effects associated with the construction... Environmental Impact Statement for Implementation of Passenger Rail Service Between Tucson, AZ and Phoenix, AZ...

  11. Using Travel Diary Data to Estimate the Emissions Impacts of Transportation Strategies: The Puget Sound Telecommuting Demonstration Project

    OpenAIRE

    Henderson, Dennis K.; Koenig, Brett E.; Mokhtarian, Patricia L.

    1996-01-01

    Transportation control measures are often implemented for their environmental benefits, but there is a need to quantify what benefits actually occur. Telecommuting has the potential to reduce the number of daily trips and miles traveled with personal vehicles and, consequently, the overall emissions resulting from vehicle activity. This search studies the emissions impacts of telecommuting for the participants of the Puget Sound Telecommuting Demonstration Project (PSTDP). The California Air ...

  12. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  13. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rios O, J. E.; Martinez L, A. G.

    2008-01-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  14. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  15. Impacts of the Three Gorges Project on Local Climate

    Science.gov (United States)

    Song, Z.; Liang, S.; Feng, L.

    2015-12-01

    Three Gorges Project (TGP) is the largest hydroelectric project in the world and has led to significant land cover changes in Three Gorges Reservoir Area (TGRA). Since its construction the debates on its environmental and climatic impacts have never stopped, especially after the extreme drought and flood in Yangtze River Basin these years. TGP reached its final impounding water level in 2010. However, studies on systematically monitoring the long-term variations in surface and atmospheric parameters in TGRA are still lacking. In this study, three important surface parameters - surface albedo, land surface temperature (LST) and evapotranspiration (ET) and two climatic parameters - air temperature and precipitation were investigated from 2000 to 2013 by combining multiple remote sensing data and ground measurements. Results showed that along the reservoir albedo decreased significantly as a result of water impounding. Correspondingly, in the same region daytime LST decreased in spring and summer and nighttime LST increased in autumn and winter. In the western region of TGRA, albedo increased due to resettlement and LST also changed. The average ET increased by 20% in TGR but kept stable in the whole TGRA. In contrast to LST, air temperature showed less apparent spatial and temporal variability. Only in the region near the dam air temperature experienced a decrease at daytime and an increase at nighttime. Further analysis demonstrated precipitation revealed no apparent changes in TGRA and the precipitation anomaly in northwest of TGRA may not be connected with TGP. All of the findings provide a more substantial clues of local climate change caused by TGP.

  16. THE FEATURES OF THE PROCEDURE FOR MAKING THE DECISION ON THE IMPLEMENTATION OF PROJECTS THE PUBLIC-PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    M. Vorobiova

    2018-01-01

    Full Text Available The procedure for making a decision on the implementation of public-private partnership, which has developed in Ukraine was examined in the article. Three consecutive stages of preparation for the implementation of projects of partnership between the state and business were сomprehensively considered. The main disadvantages of each stage were determined and suggestions for their improvement were given.

  17. Evaluation of the Strategy Management Implementation in Project- Oriented Service Organizations

    Directory of Open Access Journals (Sweden)

    Abolfazl Sherafat

    2014-02-01

    Full Text Available Although developing strategic and operational plans is a difficult and complicated process, their successful implementation is much more difficult. Many organizations fail in the full implementation of their strategies. This is not due to the partial definition of strategies and organization‘s operational plan, but this is likely due to the lack of strong framework for creating alignment between employees and operational process and the organizational goals. To implement strategies effectively and to develop a comprehensive management system and to improve the performance, Robert Kaplan and David Norton introduced a modern management system which is Balanced ScoreCard. Likewise they introduced five main criteria: leadership, translation, alignment, every day process and ongoing process for a strategy oriented organization. This paper is intended to offer a systematic approach for measuring the effectiveness and efficiency of the strategic plan performance. For this study the questionnaire was distributed in a project- orientated service organization and after collection, by the use of statistical. Analysis especially factor analysis the grouping of sub-criteria under the five main criteria was confirmed. The statistical analysis showed that, two criteria of alignment and every day work had the lowest scores in terms of both implementation and effectiveness in the organization‘s senior and executive manager‘s point of view. With deep interview, studying of scorecards and meeting of the strategic committee of the studied organization, the two dimension of alignment and every day work were further examined and after identifying upgradeable areas, some suggestions for improving the effectiveness and efficiency of the studied organization were presented.

  18. CE: Original Research: Napping on the Night Shift: A Two-Hospital Implementation Project.

    Science.gov (United States)

    Geiger-Brown, Jeanne; Sagherian, Knar; Zhu, Shijun; Wieroniey, Margaret Ann; Blair, Lori; Warren, Joan; Hinds, Pamela S; Szeles, Rose

    2016-05-01

    : Nurses who work the night shift often experience high levels of sleepiness. Napping has been adopted as an effective countermeasure to sleepiness and fatigue in other safety-sensitive industries, but has not had widespread acceptance in nursing. To assess the barriers to successful implementation of night-shift naps and to describe the nap experiences of night-shift nurses who took naps. In this two-hospital pilot implementation project, napping on the night shift was offered to six nursing units for which the executive nursing leadership had given approval. Unit nurse managers' approval was sought, and where granted, further explanation was given to the unit's staff nurses. A nap experience form, which included the Karolinska Sleepiness Scale, was used to assess pre-nap sleepiness level, nap duration and perceived sleep experience, post-nap sleep inertia, and the perceived helpfulness of the nap. Nurse managers and staff nurses were also interviewed at the end of the three-month study period. Successful implementation occurred on only one of the six units, with partial success seen on a second unit. Barriers primarily occurred at the point of seeking the unit nurse managers' approval. On the successful unit, 153 30-minutes naps were taken during the study period. A high level of sleepiness was present at the beginning of 44% of the naps. For more than half the naps, nurses reported achieving either light (43%) or deep (14%) sleep. Sleep inertia was rare. The average score of helpfulness of napping was high (7.3 on a 1-to-10 scale). Nurses who napped reported being less drowsy while driving home after their shift. These data suggest that when barriers to napping are overcome, napping on the night shift is feasible and can reduce nurses' workplace sleepiness and drowsy driving on the way home. Addressing nurse managers' perceptions of and concerns about napping may be essential to successful implementation.

  19. Designing and Implementing an Online GIS Tool for Schools: The Finnish Case of the PaikkaOppi Project

    Science.gov (United States)

    Riihelä, Juha; Mäki, Sanna

    2015-01-01

    This article describes initiatives implemented in Finland to create an online learning environment for studying geographic information systems (GIS). A development project produced an online GIS tool called PaikkaOppi, aimed at promoting GIS studies and spatial thinking skills in upper secondary schools. The project is reviewed through analysis of…

  20. Evaluation of the Parent-Implemented Communication Strategies (PiCS) Project Using the Multiattribute Utility (MAU) Approach

    Science.gov (United States)

    Stoner, Julia B.; Meadan, Hedda; Angell, Maureen E.; Daczewitz, Marcus

    2012-01-01

    We conducted a multiattribute utility (MAU) evaluation to assess the Parent-Implemented Communication Strategies (PiCS) project which was funded by the Institute of Education Sciences (IES). In the PiCS project parents of young children with developmental disabilities are trained and coached in their homes on naturalistic and visual teaching…