WorldWideScience

Sample records for project gasbuggy site

  1. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  2. Long-Term Hydrologic Monitoring Program: Project Gasbuggy Rio Arriba County, New Mexico

    International Nuclear Information System (INIS)

    1986-10-01

    The Gasbuggy site is located in Rio Arriba County, New Mexico, approximately 55 air miles (88.6 kilometers) east of Farmington, New Mexico. The Gasbuggy device with a yield of 29 kilotons, was detonated December 10, 1967. It was the first US underground nuclear experiment for the stimulation of low-productive natural gas reservoirs. The purpose of the Long-Term Hydrologic Monitoring Program at the Gasbuggy site is to obtain data that will assure the public safety; inform the public, the news media, and the scientific community relative to radiological contamination; and to document compliance with federal, state, and local antipollution requirements. The Gasbuggy site geographical setting, climate, geology, and hydrology are described. Site history, including Gasbuggy event information and Gasbuggy monitoring by the US Public Health is described. Site cleanup activities conducted in 1978 are described. Postoperational surveys indicate that the Gasbuggy site is well below the established decontamination criteria and that no hazard exists or will likely occur during public use of the land surface of the Gasbuggy site

  3. Gasbuggy Site Assessment and Risk Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-03-01

    This report describes the geologic and hydrologic conditions and evaluates potential health risks to workers in the natural gas industry in the vicinity of the Gasbuggy, New Mexico, site, where the U.S. Atomic Energy Commission detonated an underground nuclear device in 1967. The 29-kiloton detonation took place 4,240 feet below ground surface and was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation in the San Juan Basin, Rio Arriba County, New Mexico, on land administered by Carson National Forest. A site-specific conceptual model was developed based on current understanding of the hydrologic and geologic environment. This conceptual model was used for establishing plausible contaminant exposure scenarios, which were then evaluated for human health risk potential. The most mobile and, therefore, the most probable contaminant that could result in human exposure is tritium. Natural gas production wells were identified as having the greatest potential for bringing detonation-derived contaminants (tritium) to the ground surface in the form of tritiated produced water. Three exposure scenarios addressing potential contamination from gas wells were considered in the risk evaluation: a gas well worker during gas-well-drilling operations, a gas well worker performing routine maintenance, and a residential exposure. The residential exposure scenario was evaluated only for comparison; permanent residences on national forest lands at the Gasbuggy site are prohibited

  4. Gasbuggy Site Assessment and Risk Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-03-01

    The Gasbuggy site is in northern New Mexico in the San Juan Basin, Rio Arriba County (Figure 1-1). The Gasbuggy experiment was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation, a tight, gas-bearing sandstone formation. The 29-kiloton-yield nuclear device was placed in a 17.5-inch wellbore at 4,240 feet (ft) below ground surface (bgs), approximately 40 ft below the Pictured Cliffs/Lewis shale contact, in an attempt to force the cavity/chimney formed by the detonation up into the Pictured Cliffs Sandstone. The test was conducted below the southwest quarter of Section 36, Township 29 North, Range 4 West, New Mexico Principal Meridian. The device was detonated on December 10, 1967, creating a 335-ft-high chimney above the detonation point and a cavity 160 ft in diameter. The gas produced from GB-ER (the emplacement and reentry well) during the post-detonation production tests was radioactive and diluted, primarily by carbon dioxide. After 2 years, the energy content of the gas had recovered to 80 percent of the value of gas in conventionally developed wells in the area. There is currently no technology capable of remediating deep underground nuclear detonation cavities and chimneys. Consequently, the U.S. Department of Energy (DOE) must continue to manage the Gasbuggy site to ensure that no inadvertent intrusion into the residual contamination occurs. DOE has complete control over the 1/4 section (160 acres) containing the shot cavity, and no drilling is permitted on that property. However, oil and gas leases are on the surrounding land. Therefore, the most likely route of intrusion and potential exposure would be through contaminated natural gas or contaminated water migrating into a producing natural gas well outside the immediate vicinity of ground zero. The purpose of this report is to describe the current site conditions and evaluate the potential health risks posed by the most plausible

  5. Gasbuggy, New Mexico Long-Term Hydrologic Monitoring Program Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-06-01

    This report summarizes an evaluation of the Long-Term Hydrologic Monitoring Program (LTHMP) that has been conducted since 1972 at the Gasbuggy, New Mexico underground nuclear detonation site. The nuclear testing was conducted by the U.S. Atomic Energy Commission under the Plowshare program, which is discussed in greater detail in Appendix A. The detonation at Gasbuggy took place in 1967, 4,240 feet below ground surface, and was designed to fracture the host rock of a low-permeability natural gas-bearing formation in an effort to improve gas production. The site has historically been managed under the Nevada Offsites Project. These underground nuclear detonation sites are within the United States but outside of the Nevada Test Site where most of the experimental nuclear detonations conducted by the U.S. Government took place. Gasbuggy is managed by the U.S. Department of Energy (DOE) Office of Legacy Management (LM ).

  6. An aerial radiological survey of Project Gasbuggy and surrounding area, Rio Arriba County, New Mexico. Date of survey: October 27, 1994

    International Nuclear Information System (INIS)

    1995-08-01

    An aerial radiological survey was conducted over the Project Gasbuggy site, 55 miles (89 kilometers) east of Farmington, New Mexico, on October 27, 1994. Parallel lines were flown at intervals of 300 feet (91 meters) over a 16-square-mile (41-square-kilometer) area at a 150-foot (46-meter) altitude centered on the Gasbuggy site. The gamma energy spectra obtained were reduced to an exposure rate contour map overlaid on a high altitude aerial photograph of the area. The terrestrial exposure rate varied from 14 to 20 microR/h at 1 meter above ground level. No anomalous or man-made isotopes were found

  7. Gasbuggy in perspective

    International Nuclear Information System (INIS)

    Holzer, Alfred

    1970-01-01

    The Gasbuggy experiment set out to answer a number of questions: To what degree could a low-permeability, gas-bearing formation be stimulated? What were the mechanisms responsible for stimulation of gas? What were the problems of product contamination and potential ground shock damage? After two years of postshot work, some of these questions are being answered; more precisely, pressures, temperatures and concentrations of radioactive and non-radioactive constituents of the gas are being established. However, analyzing these quantities and their dependence on variables such as flow rates in terms of a self-consistent model of all the detonation phenomena has been a difficult and slow process. The validity of such a model must be tested by data from other detonations with geologies, reservoir properties and, perhaps, explosive yields different than those of Gasbuggy. The gas stimulation projects now being planned must be capable of furnishing some of these data before they can be called experiments in the fullest sense. (author)

  8. Gasbuggy in perspective

    Energy Technology Data Exchange (ETDEWEB)

    Holzer, Alfred [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    The Gasbuggy experiment set out to answer a number of questions: To what degree could a low-permeability, gas-bearing formation be stimulated? What were the mechanisms responsible for stimulation of gas? What were the problems of product contamination and potential ground shock damage? After two years of postshot work, some of these questions are being answered; more precisely, pressures, temperatures and concentrations of radioactive and non-radioactive constituents of the gas are being established. However, analyzing these quantities and their dependence on variables such as flow rates in terms of a self-consistent model of all the detonation phenomena has been a difficult and slow process. The validity of such a model must be tested by data from other detonations with geologies, reservoir properties and, perhaps, explosive yields different than those of Gasbuggy. The gas stimulation projects now being planned must be capable of furnishing some of these data before they can be called experiments in the fullest sense. (author)

  9. Gas quality analysis and evaluation program for project Gasbuggy

    Energy Technology Data Exchange (ETDEWEB)

    Smith, C F [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    Experimental results of the gas quality analysis program for Project Gasbuggy through August 1969 are presented graphically, addressing the questions raised by the preshot program goals. The chemical composition and the concentrations of tritium, krypton-85, carbon-14 and argon-37, 39 are presented as a function of time and gas production from the nuclear chimney. Chemically, the presence of CO{sub 2}, CO and H{sub 2} served to dilute the formation gas and caused reactions which significantly altered the gas composition at early times. The radionuclide content of the chimney gas at reentry was some 800 pCi/cm{sup 3} of which about 80% was CH{sub 3}T. Lesser quantities of tritium were observed as HT, C{sub 2}H{sub 5}T and C{sub 3}H{sub 7}T. The other major contaminant was Kr{sup 85} which was present at about one-fifth the level of CH{sub 3}T. Small quantities of carbon-14 and argon-39 were also identified. The only other radionuclides identified in the gas were relatively short-lived rare gases. During the production testing, about two and one-half chimney volumes of gas at formation pressure were removed. This removal, accompanied by dilution, has reduced the radionuclide concentrations to about 7% of their levels at reentry. The production characteristics of the Gasbuggy environment prevented an adequate test of the effectiveness of chimney flushing. However, the rapid drawdown concept is supported by the available data as an effective means of reducing contaminant levels. The changes in composition during production or testing are seen to be consistent with a model involving a non-uniform gas influx rate and flow distribution over the chimney region. Mixing times are estimated to be on the order of a few days, so that increasing concentrations following a sudden gas influx can be explained. (author)

  10. Gasbuggy, New Mexico, Hydrologic and Natural Gas Sampling and Analysis Results for 2009

    International Nuclear Information System (INIS)

    2009-11-01

    The U.S. Department of Energy (DOE) Office of Legacy Management conducted hydrologic and natural gas sampling for the Gasbuggy, New Mexico, site on June 16, and 17, 2009. Hydrologic sampling consists of collecting water samples from water wells and surface water locations. Natural gas sampling consists of collecting both gas samples and samples of produced water from gas production wells. The water well samples were analyzed for gamma-emitting radionuclides and tritium. Surface water samples were analyzed for tritium. Water samples from gas production wells were analyzed for gamma-emitting radionuclides, gross alpha, gross beta, and tritium. Natural gas samples were analyzed for tritium and carbon-14. Water samples were analyzed by ALS Laboratory Group in Fort Collins, Colorado, and natural gas samples were analyzed by Isotech Laboratories in Champaign, Illinois. Concentrations of tritium and gamma-emitting radionuclides in water samples collected in the vicinity of the Gasbuggy site continue to demonstrate that the sample locations have not been impacted by detonation-related contaminants. Results from the sampling of natural gas from producing wells demonstrate that the gas wells nearest the Gasbuggy site are not currently impacted by detonation-related contaminants. Annual sampling of the gas production wells nearest the Gasbuggy site for gas and produced water will continue for the foreseeable future. The sampling frequency of water wells and surface water sources in the surrounding area will be reduced to once every 5 years. The next hydrologic sampling event at water wells, springs, and ponds will be in 2014.

  11. Assessment of hydrologic transport of radionuclides from the Gasbuggy underground nuclear test site, New Mexico

    International Nuclear Information System (INIS)

    Earman, S.; Chapman, J.; Andricevic, R.

    1996-09-01

    The U.S. Department of Energy (DOE) is operating an environmental restoration program to characterize, remediate, and close non-Nevada Test Site locations that were used for nuclear testing. Evaluation of radionuclide transport by groundwater from these sites is an important part of the preliminary risk analysis. These evaluations are undertaken to allow prioritization of the test areas in terms of risk, provide a quantitative basis for discussions with regulators and the public about future work at the sites, and provide a framework for assessing data needs to be filled by site characterization. The Gasbuggy site in northwestern New Mexico was the location of an underground detonation of a 29-kiloton nuclear device in 1967. The test took place in the Lewis Shale, approximately 182 m below the Ojo Alamo Sandstone, which is the aquifer closest to the detonation horizon. The conservative assumption was made that tritium was injected from the blast-created cavity into the Ojo Alamo Sandstone by the force of the explosion, via fractures created by the shot. Model results suggest that if radionuclides produced by the shot entered the Ojo Alamo, they are most likely contained within the area currently administered by DOE. The transport calculations are most sensitive to changes in the mean groundwater velocity, followed by the variance in hydraulic conductivity, the correlation scale of hydraulic conductivity, the transverse hydrodynamic dispersion coefficient, and uncertainty in the source size. This modeling was performed to investigate how the uncertainty in various physical parameters affects calculations of radionuclide transport at the Gasbuggy site, and to serve as a starting point for discussion regarding further investigation at the site; it was not intended to be a definitive simulation of migration pathways or radionuclide concentration values

  12. Gasbuggy reservoir evaluation - 1969 report

    International Nuclear Information System (INIS)

    Atkinson, C.H.; Ward, Don C.; Lemon, R.F.

    1970-01-01

    The December 10, 1967, Project Gasbuggy nuclear detonation followed the drilling and testing of two exploratory wells which confirmed reservoir characteristics and suitability of the site. Reentry and gas production testing of the explosive emplacement hole indicated a collapse chimney about 150 feet in diameter extending from the 4,240-foot detonation depth to about 3,900 feet, the top of the 300-foot-thick Pictured Cliffs gas sand. Production tests of the chimney well in the summer of 1968 and during the last 12 months have resulted in a cumulative production of 213 million cubic feet of hydrocarbons, and gas recovery in 20 years is estimated to be 900 million cubic feet, which would be an increase by a factor of at least 5 over estimated recovery from conventional field wells in this low permeability area. At the end of production tests the flow rate was 160,000 cubic feet per day, which is 6 to 7 times that of an average field well in the area. Data from reentry of a pre-shot test well and a new postshot well at distances from the detonation of 300 and 250 feet, respectively, indicate low productivity and consequently low permeability in any fractures at these locations. (author)

  13. Gasbuggy reservoir evaluation - 1969 report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H; Ward, Don C [Bureau of Mines, U.S. Department of the Interior (United States); Lemon, R F [El Paso Natural Gas Company (United States)

    1970-05-01

    The December 10, 1967, Project Gasbuggy nuclear detonation followed the drilling and testing of two exploratory wells which confirmed reservoir characteristics and suitability of the site. Reentry and gas production testing of the explosive emplacement hole indicated a collapse chimney about 150 feet in diameter extending from the 4,240-foot detonation depth to about 3,900 feet, the top of the 300-foot-thick Pictured Cliffs gas sand. Production tests of the chimney well in the summer of 1968 and during the last 12 months have resulted in a cumulative production of 213 million cubic feet of hydrocarbons, and gas recovery in 20 years is estimated to be 900 million cubic feet, which would be an increase by a factor of at least 5 over estimated recovery from conventional field wells in this low permeability area. At the end of production tests the flow rate was 160,000 cubic feet per day, which is 6 to 7 times that of an average field well in the area. Data from reentry of a pre-shot test well and a new postshot well at distances from the detonation of 300 and 250 feet, respectively, indicate low productivity and consequently low permeability in any fractures at these locations. (author)

  14. Project Gasbuggy well plugging and site restoration plan

    International Nuclear Information System (INIS)

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  15. Tritium migration at the Gasbuggy site: Evaluation of possible hydrologic pathways

    International Nuclear Information System (INIS)

    Chapman, J.; Mihevc, T.; Lyles, B.

    1996-09-01

    An underground nuclear test named Gasbuggy was conducted in northwestern New Mexico in 1967. Subsequent groundwater monitoring in an overlying aquifer by the U.S. Environmental Protection Agency revealed increasing levels of tritium in monitoring well EPNG 10-36, located 132 m from the test, suggesting migration of contaminants from the nuclear cavity. There are three basic scenarios that could explain the occurrence of tritium in well 10-36: (1) introduction of tritium into the well from the land surface, (2) migration of tritium through the Ojo Alamo Formation, and (3) migration through the Pictured Cliffs Formation. The two subsurface transport scenarios were evaluated with a travel time analysis. In one, transport occurs to the Ojo Alamo sandstone either up the emplacement hole or through fractures created by the blast, and then laterally through the aquifer to the monitoring well. In the other, lateral transport occurs through fractures in the underlying Pictured Cliffs detonation horizon and then migrates up the monitoring well through plugged casing connecting the two formations. The travel time analysis indicates that the hydraulic conductivity measured in the Ojo Alamo Formation is too low for lateral transport to account for the observed arrival of tritium at the monitoring well. This suggests transport either through fractures intersecting the Ojo Alamo close to well EPNG 10-36, or through fractures in the Pictured Cliffs and up through the bottom plug in the well. The transport scenarios were investigated using hydrologic logging techniques and sampling at the monitoring well, with the fieldwork conducted after the removal of a string of 0.05-m-diameter tubing that had previously provided the only monitoring access

  16. Interpreting the chemical results of the Gasbuggy experiment

    International Nuclear Information System (INIS)

    Taylor, R.W.; Lee, E.L.; Hill, J.H.

    1970-01-01

    Nuclear explosions in carbonate-bearing rocks release large amounts of CO 2 . In some cases, for example, when the explosion is contained and dolomite is the principal carbonate mineral, sufficient CO 2 may be generated to drive the formation gas away from the chimney. Rocks which contain free carbon, such as the shales of the recent Gasbuggy and proposed Bronco and Dragon Trail experiments, will liberate CO and H 2 in amounts predicted from the yield of the explosive and the C, CO 2 and H 2 O concentration in the rock. In general, the greater the amount of free carbon in a rock, the more H 2 will be produced and the higher will be the fraction of tritium in the gas phase. (author)

  17. Interpreting the chemical results of the Gasbuggy experiment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R W; Lee, E L; Hill, J H [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    Nuclear explosions in carbonate-bearing rocks release large amounts of CO{sub 2}. In some cases, for example, when the explosion is contained and dolomite is the principal carbonate mineral, sufficient CO{sub 2} may be generated to drive the formation gas away from the chimney. Rocks which contain free carbon, such as the shales of the recent Gasbuggy and proposed Bronco and Dragon Trail experiments, will liberate CO and H{sub 2} in amounts predicted from the yield of the explosive and the C, CO{sub 2} and H{sub 2}O concentration in the rock. In general, the greater the amount of free carbon in a rock, the more H{sub 2} will be produced and the higher will be the fraction of tritium in the gas phase. (author)

  18. AEC controlled area safety program

    Energy Technology Data Exchange (ETDEWEB)

    Hendricks, D W [Nevada Operations Office, Atomic Energy Commission, Las Vegas, NV (United States)

    1969-07-01

    The detonation of underground nuclear explosives and the subsequent data recovery efforts require a comprehensive pre- and post-detonation safety program for workers within the controlled area. The general personnel monitoring and environmental surveillance program at the Nevada Test Site are presented. Some of the more unusual health-physics aspects involved in the operation of this program are also discussed. The application of experience gained at the Nevada Test Site is illustrated by description of the on-site operational and safety programs established for Project Gasbuggy. (author)

  19. AEC controlled area safety program

    International Nuclear Information System (INIS)

    Hendricks, D.W.

    1969-01-01

    The detonation of underground nuclear explosives and the subsequent data recovery efforts require a comprehensive pre- and post-detonation safety program for workers within the controlled area. The general personnel monitoring and environmental surveillance program at the Nevada Test Site are presented. Some of the more unusual health-physics aspects involved in the operation of this program are also discussed. The application of experience gained at the Nevada Test Site is illustrated by description of the on-site operational and safety programs established for Project Gasbuggy. (author)

  20. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  1. Near-Site Transportation Infrastructure Project

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities

  2. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  3. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  4. Geospatial Optimization of Siting Large-Scale Solar Projects

    Energy Technology Data Exchange (ETDEWEB)

    Macknick, Jordan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Quinby, Ted [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caulfield, Emmet [Stanford Univ., CA (United States); Gerritsen, Margot [Stanford Univ., CA (United States); Diffendorfer, Jay [U.S. Geological Survey, Boulder, CO (United States); Haines, Seth [U.S. Geological Survey, Boulder, CO (United States)

    2014-03-01

    Recent policy and economic conditions have encouraged a renewed interest in developing large-scale solar projects in the U.S. Southwest. However, siting large-scale solar projects is complex. In addition to the quality of the solar resource, solar developers must take into consideration many environmental, social, and economic factors when evaluating a potential site. This report describes a proof-of-concept, Web-based Geographical Information Systems (GIS) tool that evaluates multiple user-defined criteria in an optimization algorithm to inform discussions and decisions regarding the locations of utility-scale solar projects. Existing siting recommendations for large-scale solar projects from governmental and non-governmental organizations are not consistent with each other, are often not transparent in methods, and do not take into consideration the differing priorities of stakeholders. The siting assistance GIS tool we have developed improves upon the existing siting guidelines by being user-driven, transparent, interactive, capable of incorporating multiple criteria, and flexible. This work provides the foundation for a dynamic siting assistance tool that can greatly facilitate siting decisions among multiple stakeholders.

  5. Site characterization activities at Stripa and other Swedish projects

    International Nuclear Information System (INIS)

    Ahlstroehm, P.E.

    1991-01-01

    The Swedish research programme concerning spent nuclear fuel disposal aims for submitting a siting license application around the year 2000. An important step towards that goal will be the detailed characterization of at least two potential sites in late 1990s. In preparation for such characterization several research projects are conducted. One is the international Stripa Project that includes a site characterization and validation project for a small size granite rock body. The Stripa work also includes further development of instrumentation and measurement techniques. Another project is the Finnsjoen Fracture Zone Project, which is characterizing a subhorizontal zone at depths from 100 to 350 meters. The third project is the new Swedish Hard Rock Laboratory planned at the site of the Oskarshamn nuclear power plant. The preinvestigations and construction of this laboratory include major efforts in development, application and validation of site characterization methodology. (author) 6 figs., 9 refs

  6. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  7. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  8. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  9. Site identification presentation: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-11-01

    The final step in the site identification process for the Basalt Waste Isolation Project is described. The candidate sites are identified. The site identification methodology is presented. The general objectives which must be met in selecting the final site are listed. Considerations used in the screening process are also listed. Summary tables of the guidelines used are included

  10. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  11. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  12. Yucca Mountain Project Site Atlas: Volume 1: Draft

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project Site Atlas is a reference document of field activities which have been, or are being, conducted by the US Department of Energy (DOE) to support investigations of Yucca Mountain as a potential site for an underground repository for high-level radioactive waste. These investigations, as well as future investigations, will yield geologic, geophysical, geochemical, geomechanical, hydrologic, volcanic, seismic, and environmental data necessary to characterize Yucca Mountain and its regional setting. This chapter summarizes the background of the NNWSI Project and the objective, scope, structure, and preparation of the Site Atlas. Chapter 2 describes in more detail the bibliography and map portfolio portions of the Atlas, which are presented in Chapter 4 and Volume 2, respectively. Chapter 3 describes how to use the Atlas. The objective of the Site Atlas is to create a management tool for the DOE Waste Management Project Office (WMPO) that will allow the WMPO to compile and disseminate information regarding the location of NNWSI Project field investigations, and document the permits acquired and the environmental, archaeological, and socioeconomic surveys conducted to support those investigations. The information contained in the Atlas will serve as a historical reference of site investigation field activities. A companion document to the Atlas is the NNWSI Project Surface Based Investigations Plan (SBIP)

  13. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  14. Yucca Mountain Site characterization project bibliography, January--June 1991

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Science and Technology Database from January 1, 1990, through December 31, 1991

  15. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  16. Area 5 Site characterization project report, FY 1994

    International Nuclear Information System (INIS)

    Albright, W.; Tyler, S.; Chapman, J.; Miller, M.; Estrella, R.

    1994-09-01

    The Area 5 Site Characterization Project is designed to determine the suitability of the Radioactive Waste Management Site (RWMS) for disposal of low-level waste (LLW), mixed waste (MW) and transuranic waste (TRU). The Desert Research institute (DRI) has conducted this study for the Area 5 Site Characterization Project for the US Department of Energy, Nevada Operations Office (DOE/NV), Waste Management Division (WMD). The purpose of DRI's Area 5 Site Characterization Project is to characterize important properties of the upper vadose zone which influence infiltration and redistribution of water and transport of solutes as well as to characterize the water quality and hydrologic conditions of the uppermost aquifer. This report describes methods and presents a summary of all data and results from laboratory physical and chemical testing from borehole samples through September 1994. DRI laboratories performed soil water content, soil water potential, soil bulk density, and soil water extract isotope analyses

  17. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  18. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  19. Yucca Mountain Site characterization project bibliography, January--June 1991

    International Nuclear Information System (INIS)

    Lorenz, J.J.; Stephan, P.M.

    1991-09-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1991 through June 1991. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  20. Yucca Mountain Site Characterization Project bibliography, January--June 1992

    International Nuclear Information System (INIS)

    1992-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1993, through June 30, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  1. Yucca Mountain Site Characterization Project Bibliography, July--December 1990

    International Nuclear Information System (INIS)

    1991-05-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountains Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from July 1990 through December 1990. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers and articles are included in the sponsoring organizations list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  2. Yucca Mountain Site characterization project bibliography, January--June 1992

    International Nuclear Information System (INIS)

    1992-09-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through June 30, 1992. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor resorts, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  3. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  4. The SKI SITE-94 project approach to analyzing confidence in site-specific data

    International Nuclear Information System (INIS)

    Dverstorp, B.; Andersson, J.

    1995-01-01

    The ongoing SKI SITE-94 project is a fully integrated performance assessment based on a hypothetical repository at 500 m depth in crystalline rock. One main objective of the project is to develop a methodology for incorporating data from a site characterization into the performance assessment. The hypothetical repository is located at SKB's Hard Rock Laboratory at Aspo in south-eastern Sweden. The site evaluation in SITE-94 uses data from the pre-excavation phase that comprised measurements performed on the ground and in boreholes, including cross-hole hydraulic and tracer experiments. Uncertainties related to measurement technique, equipment and methods for interpretation were evaluated through a critical review of geohydraulic measurement methods and a complete re-evaluation of the hydraulic packer tests using the generalised radial flow (GRF) theory. Groundwater chemistry samples were analyzed for representativeness and sampling errors. A wide range of site models within geology, hydrogeology, geochemistry and rock mechanics has been developed and tested with the site characterization data. (authors). 10 refs., 3 figs., 2 tabs

  5. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  6. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  7. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  8. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  9. Outdoor radon monitoring plan for the UMTRA Project sites

    International Nuclear Information System (INIS)

    1986-02-01

    This document describes the monitoring schedules and methods used to measure ambient radon concentrations around Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Radon monitoring at both processing sites and disposal sites is performed primarily for two reasons. The first, and foremost, of these is to provide a means to keep the off-site radon concentrations during the construction activities As Low As Reasonably Achievable (ALARA). The second purpose is to provide a basis for comparison with the EPA standards developed for the UMTRA Project. Radon monitoring data are also used to demonstrate compliance with ambient concentration standards and for public information due to concern about potential radiation releases during construction. 1 fig., 1 tab

  10. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  11. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  12. Development of a site analysis tool for distributed wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Shawn [The Cadmus Group, Inc., Waltham MA (United States)

    2012-02-28

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

  13. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    International Nuclear Information System (INIS)

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy's Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it

  14. Yucca Mountain site characteriztion project bibliography. Progress Report, 1994--1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project which was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994, through December 31, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology database which were not sponsored by the project but have some relevance to it.

  15. Site characterization quality assurance for the California LLRW Disposal Site Project

    International Nuclear Information System (INIS)

    Hanrahan, T.P.; Ench, J.E.; Serlin, C.L.; Bennett, C.B.

    1988-01-01

    In December of 1985 US Ecology was chosen as the license designee for the State of California's low-level radioactive waste disposal facility. In early 1987, three candidate sites were selected for characterization studies in preparation for identifying the preferred site. The geotechnical characterization activities along with studies of the ecological and archaeological attributes, as well as assessments of the socio-economic impacts and cultural resources all provide input towards selection of the proposed site. These technical studies in conjunction with comments from local citizen committees and other interested parties are used as a basis for determining the proposed site for which full site characterization as required by California licensing requirements are undertaken. The purpose of this paper is to present an overview of the program for Quality Assurance and Quality Control for the site characterization activities on the California LLRW Disposal Site Project. The focus is on three major perspectives: The composite QA Program and two of the primary characterization activities, the geotechnical and the meteorological investigations

  16. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  17. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  18. Global Land Survey Impervious Mapping Project Web Site

    Science.gov (United States)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  19. An evaluation of water production from the Gasbuggy reentry well

    International Nuclear Information System (INIS)

    Power, Dean V.; Bowman, Charles R.

    1970-01-01

    During the gas production testing of the Gasbuggy chimney, water production rates increased from an initial 4 to 5 barrels per 10 6 standard cubic feet of gas to 40 to 50 barrels per 10 6 standard cubic feet of gas. This unexpected occurrence hampered operations and increased waste disposal costs. A model is developed which calculates the amount of water produced from condensation of water vapor through the cooling and expansion of the gas in the production tubing. Results from this model are compared with the observed water production from November of 1968 through May of 1969. This comparison shows that up to seven times more water is being produced at high gas flow rates than can be explained by condensed vapor, indicating that water is being introduced into the production tubing in particulate or liquid form. A correlation of excess water with the pressure, temperature and gas flow velocity parameters is performed to determine the relationship between this excess water and these parameters. It is found that the excess produced water varied linearly with downhole pressure when a threshold gas flow velocity was exceeded. The relationship is expressed by the equation H 2 0 (in barrels per day) =126.5-0.1473 BHP (in pounds per square inch). The threshold gas velocity for excess water production was found to be about 6 feet per second in the 7 in casing or 40 feet per second in the 2 7/8 in tubing. An examination of the radioactivity of the gas and water produced from GB-E indicates that the tritiated water vapor in the chimney and tubing has been diluted by extraneous water. The tritium in the gas decreased as expected from about 10.9 μCi/SCF in November 1968 to 6.2 μCi/SCF in late February 1969. During this same period, the tritium in the water decreased from about 1.2 μCi/ml to 0.12 μCi/ml. Examination of water chemistry, preshot and during the production testing, indicates that at early times when there was no excess water, the produced water was distilled

  20. SKI SITE-94. Deep Repository Performance Assessment Project. Summary

    International Nuclear Information System (INIS)

    1997-02-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is neither a safety assessment nor a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The main report (SKI-R--96-36) gives a detailed description of the many inter-related studies undertaken as part of the research project, while the present report presents a condensed summary of the main report. 46 refs

  1. Multi-Site Project Management A Program for Reducing the Cost of Technology Deployment at Department of Energy Sites

    International Nuclear Information System (INIS)

    Davis, N.R.; Selden, E.R.; Little, D.B.; Coleman, M.C.; Bennett, J.T.

    2009-01-01

    Retrieval and processing of High Level Waste (HLW) stored in Department of Energy (DOE) waste tanks is performed to support closure of the tanks as required by site specific regulatory agreements. Currently, there are four sites in the DOE Complex that have HLW tanks and must process and disposition HLW. As such, there is an opportunity to achieve an economy of scale and reduce duplication of efforts. Two or more sites typically have similar technology development and deployment needs. Technology development is already executed at the national level. As the technology is matured, the next step is to commission a design/build project. Typically each site performs this separately due to differences in waste type, tank design, site specific considerations such as proximity to the water table or to the site boundary. The focus of the individual sites tends to be on the differences between sites versus on the similarities thus there is an opportunity to minimize the cost for similar deployments. A team of engineers and project management professionals from the Savannah River Site has evaluated technology needs at the four HLW sites and determined that there is an economy of scale that can be achieved by specific technology deployments in the area of waste retrieval, waste pretreatment and waste disposition. As an example, the Waste on Wheels tank retrieval system (presented in the 2006 Waste Management Symposium) was designed and fabricated in portable modules that could be installed in HLW tanks at Hanford, Savannah River or Idaho. This same concept could be used for modular in-tank cesium removal process and equipment, tank cleaning mechanical equipment, and chemical tank cleaning process and equipment. The purpose of this paper is to present a multi-site project management approach that will reduce deployment costs and be consistent with DOE Order 413.3 project management principles. The approach will describe how projects can be managed by a lead site with

  2. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  3. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  4. Yucca Mountain Site Characterization Project Bibliography, July--December 1994: An update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Charactrization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Science and Technology Database from July 1, 1994 through December 31, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  5. Yucca Mountain Site Characterization Project Bibliography, July, December 194: An update

    International Nuclear Information System (INIS)

    1995-03-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Charactrization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Science and Technology Database from July 1, 1994 through December 31, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  6. Site observational work plan for the UMTRA Project Site at Riverton, Wyoming. Revision 3/95

    International Nuclear Information System (INIS)

    1995-03-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Riverton, Wyoming, site, is governed by the Uranium Mill Tailings Radiation Control Act and the US Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. The compliance strategy proposed for this site is natural flushing in conjunction with institutional controls. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels or alternate concentration limits that do not pose a risk to human health or the environment within 100 years. This document contains the following sections. Section 2.0 of this SOWP describes the requirements for meeting standards at UMTRA Project sites. Section 3.0 provides site-specific data and the related conceptual model. Section 4.0 provides the justification for the recommended ground water compliance strategy for the Riverton site. Section 5.0 provides the justification and process for collection and assessment of additional required data. Section 6.0 provides a list of the references cited. The appendixes include data on monitor wells and lithography, ground water, surface water, and sediment quality

  7. Software quality assurance on the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Matras, J.R.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) has been involved over the years in the continuing struggle with establishing acceptable Software Quality Assurance (SQA) requirements for the development, modification, and acquisition of computer programs used to support the Mined Geologic Disposal System. These computer programs will be used to produce or manipulate data used directly in site characterization, design, analysis, performance assessment, and operation of repository structures, systems, and components. Scientists and engineers working on the project have claimed that the SQA requirements adopted by the project are too restrictive to allow them to perform their work. This paper will identify the source of the original SQA requirements adopted by the project. It will delineate the approach used by the project to identify concerns voiced by project engineers and scientists regarding the original SQA requirements. It will conclude with a discussion of methods used to address these problems in the rewrite of the original SQA requirements

  8. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  9. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  10. Living memorials project: year 1 social and site assessment

    Science.gov (United States)

    Erika S. Svendsen; Lindsay K. Campbell

    2005-01-01

    The Living Memorials Project (LMP) social and site assessment identified more than 200 public open spaces created, used, or enhanced in memory of the tragic events of September 11, 2001 (9-11). A national registry of these sites is available for viewing and updating online. Researchers interviewed 100 community groups using social ecology methods of observation,...

  11. An evaluation of water production from the Gasbuggy reentry well

    Energy Technology Data Exchange (ETDEWEB)

    Power, Dean V; Bowman, Charles R [El Paso Natural Gas Company (United States)

    1970-05-01

    During the gas production testing of the Gasbuggy chimney, water production rates increased from an initial 4 to 5 barrels per 10{sup 6} standard cubic feet of gas to 40 to 50 barrels per 10{sup 6} standard cubic feet of gas. This unexpected occurrence hampered operations and increased waste disposal costs. A model is developed which calculates the amount of water produced from condensation of water vapor through the cooling and expansion of the gas in the production tubing. Results from this model are compared with the observed water production from November of 1968 through May of 1969. This comparison shows that up to seven times more water is being produced at high gas flow rates than can be explained by condensed vapor, indicating that water is being introduced into the production tubing in particulate or liquid form. A correlation of excess water with the pressure, temperature and gas flow velocity parameters is performed to determine the relationship between this excess water and these parameters. It is found that the excess produced water varied linearly with downhole pressure when a threshold gas flow velocity was exceeded. The relationship is expressed by the equation H{sub 2}0 (in barrels per day) =126.5-0.1473 BHP (in pounds per square inch). The threshold gas velocity for excess water production was found to be about 6 feet per second in the 7 in casing or 40 feet per second in the 2 7/8 in tubing. An examination of the radioactivity of the gas and water produced from GB-E indicates that the tritiated water vapor in the chimney and tubing has been diluted by extraneous water. The tritium in the gas decreased as expected from about 10.9 {mu}Ci/SCF in November 1968 to 6.2 {mu}Ci/SCF in late February 1969. During this same period, the tritium in the water decreased from about 1.2 {mu}Ci/ml to 0.12 {mu}Ci/ml. Examination of water chemistry, preshot and during the production testing, indicates that at early times when there was no excess water, the produced

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  14. Yucca Mountain Site Characterization Project bibliography, 1992--1994. Supplement 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE).

  15. Yucca Mountain Site Characterization Project bibliography, 1992--1993. Supplement 4

    International Nuclear Information System (INIS)

    1992-06-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1992, through December 31, 1993. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it. Earlier information on this project can be found in the first bibliography DOE/TIC-3406, which covers 1977--1985, and its three supplements DOE/OSTI-3406(Suppl.1), DOE/OSTI-3406(Suppl.2), and DOE/OSTI-3406(Suppl.3), which cover information obtained during 1986--1987, 1988--1989, and 1990--1991, respectively. All entries in the bibliographies are searchable online on the NNW database file. This file can be accessed through the Integrated Technical Information System (ITIS) of the US Department of Energy (DOE)

  16. Project M: Scale Model of Lunar Landing Site of Apollo 17

    Science.gov (United States)

    O'Brien, Hollie; Crain, Timothy P.

    2010-01-01

    The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize

  17. CosmoQuest Year 1.5: Citizen Scientist Behaviors and Site Usage Across Multiple Projects

    Science.gov (United States)

    Gugliucci, Nicole E.; Gay, P. L.; Bracey, G.; CosmoQuest Team

    2013-06-01

    CosmoQuest launched as a citizen science portal in January 2012 and has since expanded to include three projects in planetary surface mapping, one completed project searching for KBOs, and several more on the way with various astrophysical science goals. We take a close look at how our users move through the site, how much time they spend on various tasks, project retention rate, and how many use multiple projects on the site. We are also piloting a citizen science motivation survey given to random site users to find out why citizen scientists join new projects and continue to participate. This is part of a larger project using online and real-life interactions to study citizen scientist behaviors, motivations, and learning with a goal of building better community with researchers, volunteers, educators, and developers.

  18. Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

    International Nuclear Information System (INIS)

    Mctaggart, Jerri Lynne; Lott, Sheila; Gadbury, Casey

    2009-01-01

    Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has

  19. Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ''limited use.''

  20. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  1. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  2. Draft site characterization analysis of the site characterization report for the Basalt Waste Isolation Project, Hanford, Washington Site. Main report and Appendices A through D

    International Nuclear Information System (INIS)

    1983-03-01

    On November 12, 1982, the US Department of Energy submitted to the US Nuclear Regulatory Commission the Site Characterization Report for the Basalt Waste Isolation Project (DOE/RL 82-3). The Basalt Waste Isolation Project is located on DOE's Hanford Reservation in the State of Washington. NUREG-0960 contains the detailed analysis, by the NRC staff, of the site characterization report. Supporting technical material is contained in Appendices A through W

  3. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  4. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  5. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.; Metzler, D.

    1994-01-01

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequately attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars

  6. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  7. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  8. Yucca Mountain Site Characterization Project technical data catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  9. SKI SITE-94, deep repository performance assessment project, summary

    International Nuclear Information System (INIS)

    1999-01-01

    SITE-94 is a comprehensive performance assessment exercise for a hypothetical repository for spent nuclear fuel at a real site in Sweden. SITE-94 was carried out to develop the capability and tools to enable Swedish Nuclear Power Inspectorate (SKI) to review fully the proposals for a deep repository which are expected to be made by the Swedish Nuclear Fuel and Waste Management Company, SKB (the implementor). Sweden is one of the leading countries in the research and development of geological disposal of radioactive waste. The developed methodology for performance assessment has attracted interests from other countries. The Summary of the main report of the SITE-94 project is translated here into Japanese to allow to make the information on the methodology and the related issues available among Japanese concerned. (author)

  10. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  12. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  13. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  14. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    Science.gov (United States)

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  15. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry`s R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI`s capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs.

  16. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    International Nuclear Information System (INIS)

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI's capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs

  17. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  18. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  19. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  20. The project on site - setting the scene for successful industrial relations

    International Nuclear Information System (INIS)

    Morris, D.; Kershaw, A.R.

    1989-01-01

    The site construction performance at Torness and Heysham 2 has been described in various other papers during the Conference and in common with other large projects undertaken over the last 20 years a final judgement will be made as to whether, in simple terms, they were ''good'' or ''bad'' sites. Although there are many individuals or organisations who may make this judgement, it is unlikely that the basic conclusion will differ. What may differ however is the list of reasons that will be advanced to explain the final result. Looking at the investigations made into past projects, the reasons advanced for their success or otherwise can range from the geographical location of the site to material delivery problems, design changes, safety issues, or even the state of the overall national economic climate during the period under scrutiny. Where industrial relations problems are singled out, they can usually be linked to one or more of the factors mentioned. When looking at the complexity of projects such as Torness and Heysham, it is to be expected that unlooked for difficulties and problems will always arise but it is equally true that there is sufficient experience and expertise available in the industry for many possible problem areas to be anticipated and ''designed'' out before work even commences on site. This paper will be looking at the clients' role in creating a suitable environment for contractors to fully manage all aspects of their site operation and to ensure that acute problems can receive the full attention of all parties and not have to be set against a continuing background of unnecessary irritations. (author)

  1. The Cigeo project: an industrial storage site for radioactive wastes in deep underground

    International Nuclear Information System (INIS)

    Krieguer, Jean-Marie

    2017-01-01

    In 2006, France has decided to store its high-level and long-lived radioactive wastes, mostly issued from the nuclear industry, in a deep geological underground disposal site. This document presents the Cigeo project, a deep underground disposal site (located in the East of France) for such radioactive wastes, which construction is to be started in 2021 (subject to authorization in 2018). After a brief historical review of the project, started 20 years ago, the document presents the radioactive waste disposal context, the ethical choice of underground storage (in France and elsewhere) for these types of radioactive wastes, the disposal site safety and financing aspects, the progressive development of the underground facilities and, of most importance, its reversibility. In a second part, the various works around the site are presented (transport, buildings, water and power supply, etc.) together with a description of the various radioactive wastes (high and intermediate level and long-lived wastes and their packaging) that will be disposed in the site. The different steps of the project are then reviewed (the initial design and initial construction phases, the pilot industrial phase (expected in 2030), the operating phase, and the ultimate phases that will consist in the definitive closure of the site and its monitoring), followed by an extensive description of the various installations of surface and underground facilities, their architecture and their equipment

  2. Latest development in project site radwaste treatment facility (SRTF) Sanmen

    International Nuclear Information System (INIS)

    Mennicken, K.; Lohmann, P.

    2015-01-01

    Westinghouse Electric Germany GmbH (WEG) was successful in being awarded a contract as to the planning, delivery, installation and commissioning of radwaste treatment systems for the AP1000 units at Sanmen site, PR China. Operational low and intermediate level radioactive waste will be processed in the Site Radwaste Treatment Facility (SRTF). This paper explains the latest developments of the project, especially the experience with customer-hired Chinese planning partners, installation companies and Customer operating personnel. (authors)

  3. Hydrologic site characterization - the UMTRA project approach

    International Nuclear Information System (INIS)

    Binkman, J.E.; Hoopes, J.R.

    1985-01-01

    The United States Environmental Protection Agency (EPA) Standards (40 CFR 192) require site characterization of the hydrogeologic regime at and around each Uranium Mill Tailings Remedial Action (UMTRA) Project site. Also, ''judgements on the possible need for remedial or protective actions for groundwater aquifers should be guided by relevant considerations described in EPA's hazardous waste management system (47 CFR 32274).'' To address those two sets of rules and regulations, a generic approach is being developed. Fourteen primary issues were determined. These issues can be grouped into those that can be determined by documentation of available information and present conditions, those that require extensive field investigations and those that require some form of predictive modeling. To address the various issues requires an integrated effort of hydrogeologists, environmental engineers or scientists and health physicists. In this paper, the approach to the resolution of these fourteen issues is described briefly

  4. GENISES: A GIS Database for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Beckett, J.

    1991-01-01

    This paper provides a general description of the Geographic Nodal Information Study and Evaluation System (GENISES) database design. The GENISES database is the Geographic Information System (GIS) component of the Yucca Mountain Site Characterization Project Technical Database (TDB). The GENISES database has been developed and is maintained by EG ampersand G Energy Measurements, Inc., Las Vegas, NV (EG ampersand G/EM). As part of the Yucca Mountain Project (YMP) Site Characterization Technical Data Management System, GENISES provides a repository for geographically oriented technical data. The primary objective of the GENISES database is to support the Yucca Mountain Site Characterization Project with an effective tool for describing, analyzing, and archiving geo-referenced data. The database design provides the maximum efficiency in input/output, data analysis, data management and information display. This paper provides the systematic approach or plan for the GENISES database design and operation. The paper also discusses the techniques used for data normalization or the decomposition of complex data structures as they apply to GIS database. ARC/INFO and INGRES files are linked or joined by establishing ''relate'' fields through the common attribute names. Thus, through these keys, ARC can allow access to normalized INGRES files greatly reducing redundancy and the size of the database

  5. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    International Nuclear Information System (INIS)

    Andersson, J.

    1993-01-01

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reason for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments

  6. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  7. Policy and procedures for classification of Class III groundwater at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy's )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters

  8. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  9. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-04

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  10. ENHANCING EFFECTIVENESS OF EMSP PROJECTS THROUGH STRONG CONNECTIONS TO SITE PROBLEMS

    International Nuclear Information System (INIS)

    Josephson, Gary B.; Hale, Donna

    2003-01-01

    The Environmental Management Science Program (EMSP) funds basic science research that will lead to reduced remediation cost, schedule, technical uncertainties, and risk for DOE's environmental clean up. The Tanks Focus Area (TFA) has partnered with EMSP to accomplish those same objectives for DOE's largest and most expensive remediation effort - to retrieve and immobilize the highly radioactive wastes that are our nation's chief nuclear defense program legacy. TFA has been tasked to facilitate success of the EMSP investment. The key for EMSP projects to contribute to this remediation effort is communication. First, the scientist needs to understand much more about how his scientific results would be used than he could ever learn from the original EMSP solicitation or by reading the referenced DOE needs statements. Second, the scientist's results must be communicated to the site problem holders in a usable form and in a timely manner such that important information gaps can still be filled by the EMSP project. Research results can be used in a variety of ways besides deployment of new hardware or a new process. When results are USED the site problem holders become 'users'. The important aspect that research results are to be used is captured in the TFA lexicon for their clients, the DOE sites--'USERS'. The best method observed, so far, to accomplish the indispensable communication necessary for success is through direct contact between EMSP researchers and TFA/site problem holders, person to person. The observation that direct contact is the best medium for exchange of complex information may seem inanely obvious. However, it is not the normal procedure in the more academic world of the fundamental scientists, where publishing of results in a peer-reviewed journal completes the transmittal of scientific results. Direct communication between EMSP researchers and site users doesn't occur naturally. TFA actively bridges this gap between science and technology

  11. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  12. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-04-05

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm.

  13. Ponnequin Wind Energy Project: Reference site avian study, January 1, 1998--December 31, 1998

    International Nuclear Information System (INIS)

    Kerlinger, P.; Curry, R.; Ryder, R.

    2000-01-01

    This report summarizes the results of surveys completed during the period January 1, 1998, through December 31, 1998, at the Ponnequin Wind Energy Project in Weld County, Colorado. The surveys were conducted at two reference sites, and include a pre-construction avian abundance and use survey and raptor nesting, prey, and carcass surveys. The reference sites were situated immediately to the west of the project site in Weld County, Colorado, and 4.8 kilometers to the north of the site in Laramie County, Wyoming. The surveys were conducted along two 800-meter (m) main transects at each site with two 400-m (by 100-m) perpendicular transects. About 30 complete surveys were completed during the year, with a greater frequency of surveys in the late spring and early autumn. The surveys revealed mostly common species, with no endangered or threatened species on the sites. Small numbers of raptors were observed on or near the project and reference areas. During the winter, avian use and abundance was minimal. Prey species consisted primarily of thirteen-lined ground squirrels and northern pocket gophers. Two songbird carcasses were found. The results of these surveys, combined with data from several more months of surveys, will be compared to surveys conducted after construction of the wind farm

  14. Yucca Mountain Site Characterization Project bibliography, July--December 1992: An update, Supplement 3, Addendum 2

    International Nuclear Information System (INIS)

    1993-04-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from July 1, 1992, through December 31, 1992. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  15. Yucca Mountain Site Characterization Project bibliography, January--June 1995. Supplement 4, Add.3: An update

    Energy Technology Data Exchange (ETDEWEB)

    Stephan, P.M. [ed.

    1996-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1995, through June 30, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  16. Yucca Mountain Site Characterization Project Bibliography, January--June 1993. An update: Supplement 4, Addendum 1

    Energy Technology Data Exchange (ETDEWEB)

    Stephan, P.M. [ed.

    1995-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy`s Energy Science and Technology Database from January 1, 1994 through June 30, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers,and articles are included in the sponsoring organization`s list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it.

  17. Yucca Mountain Site Characterization Project Bibliography, January--June 1993. An update: Supplement 4, Addendum 1

    International Nuclear Information System (INIS)

    Stephan, P.M.

    1995-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1994 through June 30, 1994. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers,and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  18. Yucca Mountain Site Characterization Project bibliography, January--June 1995. Supplement 4, Add.3: An update

    International Nuclear Information System (INIS)

    Stephan, P.M.

    1996-01-01

    Following a reorganization of the Office of Civilian Radioactive Waste Management in 1990, the Yucca Mountain Project was renamed Yucca Mountain Site Characterization Project. The title of this bibliography was also changed to Yucca Mountain Site Characterization Project Bibliography. Prior to August 5, 1988, this project was called the Nevada Nuclear Waste Storage Investigations. This bibliography contains information on this ongoing project that was added to the Department of Energy's Energy Science and Technology Database from January 1, 1995, through June 30, 1995. The bibliography is categorized by principal project participating organization. Participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's list. Another section contains information about publications on the Energy Science and Technology Database that were not sponsored by the project but have some relevance to it

  19. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    Science.gov (United States)

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  20. The Rocky Flats Environmental Technology Site beryllium characterization project

    International Nuclear Information System (INIS)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-01-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found

  1. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  2. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  3. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  4. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  5. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  6. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  7. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  8. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  9. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status of project to date January 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fourth year (1996) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). The fourth year at the Weldon Springs Site shows sustained progress as the project moves through the final design and into the remedial action phases of the Chemical Plant Operable Unit. The remedial action phase includes the Foundations Removal work package, Chemical Solidification and Stabilization, and disposal cell

  10. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  11. DECHEM: A remedial planning tool for metallic contaminants in soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The DECHEM (DEcontamination of CHEMicals) method was developed for the Uranium Mill Tailings Remedial Action (UMTRA) Project to guide characterization and remedial planning for metals contamination in soils. This is necessary because non-radiological hazardous constituents may be more mobile than radium-226 (Ra-226), and hence may migrate more deeply into subpile soils (beneath tailings that are to be relocated) or into adjacent contaminated soils at UMTRA Project sites. The result is that remedial action to the Ra-226 excavation limit, as specified in the US Environmental Protection Agency (EPA) standards, may not adequately remove hazardous non-radiological contamination. Unmitigated, these contaminants in soil may cause health risks because of their presence in resuspended particles, their uptake by crops or fodder their seepage into aquifers used for drinking water or other possible exposure pathways. The DECHEM method was developed in response to the need for advanced planning for the remediation of chemical contaminants at UMTRA Project sites, and includes the following elements: Establishment of acceptable exposure rates for humans to chemicals, based on EPA guidelines or other toxicological literature. Modeling of chemical migration through environmental pathways from a remediated UMTRA Project site to humans. Determination of allowable residual concentrations (i.e., cleanup guidelines) for chemicals in soils that results in doses to humans that are below established acceptable exposure rates. The initial development and application of the DECHEM method has focused upon hazardous metallic contaminants such as arsenic, lead, molybdenum, and selenium, which are known to occur in elevated concentrations at some UMTRA Project sites

  12. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  13. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  14. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  15. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  16. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  17. Basalt Waste Isolation Project exploratory shaft site: Final reclamation report

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs

  18. Safety analysis and hazard classification for the 100-B/C Site Remediation Project, Phase 1. Revision 1

    International Nuclear Information System (INIS)

    Adam, W.J.; Lehrschall, R.R.; Oestreich, D.K.

    1996-07-01

    The purpose of this report is to document the preliminary hazard classification (PHC) for the initial group of sites to be remediated by the 100-B/C Site Remediation Project. The project is targeted at excavation of contaminated solid from seven waste sites, and the transportation and disposal of these wastes at the Environmental Restoration Disposal Facility. The PHC for these remediation activities is rated as radiological

  19. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  20. Assessment of the Nevada Test Site as a Site for Distributed Resource Testing and Project Plan: March 2002

    Energy Technology Data Exchange (ETDEWEB)

    Horgan, S.; Iannucci, J.; Whitaker, C.; Cibulka, L.; Erdman, W.

    2002-05-01

    The objective of this project was to evaluate the Nevada Test Site (NTS) as a location for performing dedicated, in-depth testing of distributed resources (DR) integrated with the electric distribution system. In this large scale testing, it is desired to operate multiple DRs and loads in an actual operating environment, in a series of controlled tests to concentrate on issues of interest to the DR community. This report includes an inventory of existing facilities at NTS, an assessment of site attributes in relation to DR testing requirements, and an evaluation of the feasibility and cost of upgrades to the site that would make it a fully qualified DR testing facility.

  1. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  2. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  3. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  4. U.S. Department of Energy Grand Junction Projects Office site environmental report for calendar year 1995

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatability studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits

  5. Enhancing Effectiveness of EMSP Projects Through Strong Connections to Site Problems

    International Nuclear Information System (INIS)

    Guillen, D. P.; Josephson, G. B.

    2002-01-01

    The Environmental Management Science Program (EMSP) funds basic science research that will lead to reduced remediation cost, schedule, technical uncertainties, and risk for DOE's environmental clean up. The Tanks Focus Area (TFA) has partnered with EMSP to accomplish those same objectives for DOE's largest and most expensive remediation effort--to retrieve and immobilize the highly radioactive wastes that are our nation's chief nuclear defense program legacy. TFA has been tasked to facilitate success of the EMSP investment. The key for EMSP projects to contribute to this remediation effort is communication. First, scientists need to understand much more about how their scientific results would be used than they could ever learn from the original EMSP solicitation or by reading the referenced DOE needs statements. Second, the scientists' results must be communicated to the site problem holders in a usable form and in a timely manner such that important information gaps can still be filled by the EMSP project. Research results can be used in a variety of ways besides deployment of new hardware or a new process. When results are USED the site problem holders become ''users''. The important aspect that research results are to be used is captured in the TFA lexicon for their clients, the DOE sites--''users''. This paper will show, through several examples, significant contributions EMSP scientists have made to solving DOE's high-level waste challenges through direct and enhanced communication with TFA and site users

  6. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    International Nuclear Information System (INIS)

    Prendergast-Kennedy, Ellen L.; Harvey, David W.

    2006-01-01

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  7. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    Energy Technology Data Exchange (ETDEWEB)

    Kennedy, Ellen P.; Harvey, David W.

    2006-09-08

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  8. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  9. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  10. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Brock Presgrove, S.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste currently stored at the DOE Savannah River Site Tank Farm. Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on the project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review: Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator; The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. (author)

  11. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    International Nuclear Information System (INIS)

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  12. Site observational work plan for the UMTRA project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1994-09-01

    During surface remedial action, an estimated 7.0 million tons (6.4 million tonnes) of uranium mill tailings and other contaminated materials were consolidated and stabilized on the Falls City site. The ground water protection strategy at the Falls City disposal site for the UMTRA Surface Project (Subpart A of 40 CFR Part 192 (1994)) was an application for supplemental standards, based on Class III (limited use) ground water in the uppermost aquifer. This water is not a current or potential source of drinking water. Ground water from the uppermost aquifer (ground water from the Deweesville/Conquista Members and the Dilworth Member) contains widespread ambient contamination resulting from naturally occurring conditions and from the effects of human activity not related to uranium milling operations (uranium exploration and mining activities). The ground water cannot be effectively cleaned up for drinking or other beneficial purposes using treatment methods reasonably employed by public water supply systems. The U.S. Nuclear Regulatory Commission (NRC) and the state of Texas concurred with the ground water protection strategy for the disposal site in September 1992. Surface remedial action in accord with Subpart A was completed in April 1994. The proposed ground water compliance strategy (Subpart B of 40 CFR Part 192 (1994)) at the Falls City site is to perform no remedial action based on application for supplemental standards because the ground water in the uppermost aquifer is classified as Class III ground water. Class III ground water includes ground water that is not a current or potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed by public water supply systems (40 CFR section 192.11 (e) (1994)). Although supplemental standards are being applied, the potential use of ground water in the site vicinity will be protected

  13. Site observational work plan for the UMTRA Project Site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd 3 ) (1,100,000 cubic meters [m 3 ]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. A total of 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. Two processes were used to refine the ore: an acid leach process and a sodium carbonate alkaline process. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The preliminary ground water compliance strategy at the Tuba City site is active remediation. The specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource

  14. Towards canine rabies elimination: Economic comparisons of three project sites.

    Science.gov (United States)

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  16. Tenure Issues in REDD+ Pilot Project Sites in Tanzania

    Directory of Open Access Journals (Sweden)

    Therese Dokken

    2014-02-01

    Full Text Available REDD+ has been proposed as a viable option for addressing climate change in the near term, and at relatively low cost. There is a broad consensus that clearly defined tenure rights are important for the implementation and success of REDD+, both to manage forests effectively and to protect local communities’ livelihoods. We use primary data from 23 villages in six REDD+ pilot sites in Tanzania to identify causes of deforestation and forest degradation, and tenure rights issues, at the village level prior to project implementation. Further, interviews with project proponents and examination of project documents yields insights into how the proponents plan to address tenure issues. Most villages perceive their tenure as secure and have exclusion rights, while collective action challenges are prevalent in villages experiencing deforestation and forest degradation. These findings suggest that the main tenure issues are related to internal institutional arrangements. While we find that tenure is high on the agenda for all the project proponents, they are mainly focusing on formalization and securing tenure rights from state to community level. Though we do find this to be a precondition for reducing deforestation and degradation, some of their focus should be shifted to strengthening village institutions and enhancing internal compliance.

  17. Industrial Sites Project Establishment of Final Action Levels

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  18. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  1. Summary of field operations Technical Area I well PGS-1. Site-Wide Hydrogeologic Characterization Project

    International Nuclear Information System (INIS)

    Fritts, J.E.; McCord, J.P.

    1995-02-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories, New Mexico is managing the project to assess and, when necessary, to remediate sites contaminated by the lab operations. Within the ER project, the site-wide hydrogeologic characterization task is responsible for the area-wide hydrogeologic investigation. The purpose of this task is to reduce the uncertainty about the rate and direction of groundwater flow beneath the area and across its boundaries. This specific report deals with the installation of PGS-1 monitoring well which provides information on the lithology and hydrology of the aquifer in the northern area of the Kirtland Air Force Base. The report provides information on the well design; surface geology; stratigraphy; structure; drilling, completion, and development techniques; and borehole geophysics information

  2. The Bonebrake Theological Seminary: Top-Secret Manhattan Project Site

    Science.gov (United States)

    Sopka, Katherine R.; Sopka, Elisabeth M.

    2010-09-01

    We discuss the top-secret Manhattan Project site established at the Bonebrake Theological Seminary in 1943 in Dayton, Ohio, where research on polonium and its production was carried out. The polonium produced there was then transported to Los Alamos to be used in a polonium-beryllium neutron source whose purpose was to ignite the plutonium implosion bomb that would be dropped on Nagasaki, Japan, on August 9, 1945. Our account is based primarily on the recollections of John J. Sopka, research physicist at the Bonebrake laboratory.

  3. Value of Information Analysis Project Gnome Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, Greg; Chapman, Jenny

    2010-01-01

    The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

  4. Progress report on decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    International Nuclear Information System (INIS)

    1998-01-01

    The Fernald Environmental Management Project (FEMP), is located about 18 miles northwest of Cincinnati, Ohio. Between 1953 and 1989, the facility, then called the Feed Material Production Center or FMPC, produced uranium metal products used in the eventual production of weapons grade material for use by other US Department of Energy (DOE) sites. In 1989, FMPC's production was suspended by the federal government in order to focus resources on environmental restoration versus defense production. In 1992, Fluor Daniel Fernald assumed responsibility for managing all cleanup activities at the FEMP under contract to the DOE. In 1990, as part of the remediation effort, the site was divided into five operable units based on physical proximity of contaminated areas, similar amounts of types of contamination, or the potential for a similar technology to be used in cleanup activities. This report continues the outline of the decontamination and decommissioning (D and D) activities at the FEMP site Operable Unit 3 (OU3) and provides an update on the status of the decommissioning activities. OU3, the Facilities Closure and Demolition Project, involves the remediation of more than 200 uranium processing facilities. The mission of the project is to remove nuclear materials stored in these buildings, then perform the clean out of the buildings and equipment, and decontaminate and dismantle the facilities

  5. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  6. The use of on-site Project Officers by a nuclear regulatory body

    International Nuclear Information System (INIS)

    Beare, J.W.

    1977-01-01

    In Canada consideration of applications for licensing nuclear installations is entrusted to the Reactor Safety Advisory Committee within the Atomic Energy Control Board (AECB). The licensing procedure is conducted in three stages (site approval, construction licence, operating licence). In order to control construction and operation of nuclear installations Project Officers are assigned to each particular installation. The policy of AECB is to send these officers on site several months before the reactor reaches criticality; and during reactor operation. This system clearly provides great practical advantages. (NEA) [fr

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  9. Determining the explosion effects on the Gasbuggy reservoir from computer simulation of the postshot gas production history

    International Nuclear Information System (INIS)

    Rogers, Leo A.

    1970-01-01

    Analysis of the gas production data from Gasbuggy to deduce reservoir properties outside the chimney is complicated by the large gas storage volume in the chimney because the gas flow from the surrounding reservoir into the chimney cannot be directly measured. This problem was overcome by developing a chimney volume factor F (M 2 CF/PSI) based upon analysis of rapid drawdowns during the production tests. The chimney volume factor was in turn used to construct the time history of the required influx of gas into the chimney from the surrounding reservoir. The most probable value of F to describe the chimney is found to be 0.150 M 2 CF/PSI. Postulated models of the reservoir properties outside the chimney are examined by calculating the pressure distribution and flow of gas through the reservoir with the experimentally observed chimney pressure history applied to the cavity wall. The calculated influx from the reservoir into the chimney is then compared to the required influx and the calculated pressure at a radius of 300 feet is compared to the observed pressures in a shut-in satellite well (GB-2RS) which intersects the gas-bearing formation 300 feet from the center of the chimney. A description of the mathematics in the computer program used to perform the calculations is given. Gas flow for a radial model wherein permeability and porosity are uniform through the gas producing sand outside the chimney was calculated for several values of permeability. These calculations indicated that for the first drawdown test (July 1968) the permeability-producing height product (kh) was in the region of 15 to 30 millidarcy-feet (md-ft) and that after several months of testing, the effective kh had dropped to less than 8 md-ft. Calculations wherein (1) the permeability decreases from the chimney out to the 'fracture' radius, and (2) an increased production height is used near the chimney, match the data better than the simple radial model. Reasonable fits to the data for the

  10. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  11. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  12. SITEX 2.0: Projections of protein functional sites on eukaryotic genes. Extension with orthologous genes.

    Science.gov (United States)

    Medvedeva, Irina V; Demenkov, Pavel S; Ivanisenko, Vladimir A

    2017-04-01

    Functional sites define the diversity of protein functions and are the central object of research of the structural and functional organization of proteins. The mechanisms underlying protein functional sites emergence and their variability during evolution are distinguished by duplication, shuffling, insertion and deletion of the exons in genes. The study of the correlation between a site structure and exon structure serves as the basis for the in-depth understanding of sites organization. In this regard, the development of programming resources that allow the realization of the mutual projection of exon structure of genes and primary and tertiary structures of encoded proteins is still the actual problem. Previously, we developed the SitEx system that provides information about protein and gene sequences with mapped exon borders and protein functional sites amino acid positions. The database included information on proteins with known 3D structure. However, data with respect to orthologs was not available. Therefore, we added the projection of sites positions to the exon structures of orthologs in SitEx 2.0. We implemented a search through database using site conservation variability and site discontinuity through exon structure. Inclusion of the information on orthologs allowed to expand the possibilities of SitEx usage for solving problems regarding the analysis of the structural and functional organization of proteins. Database URL: http://www-bionet.sscc.ru/sitex/ .

  13. Summary of results of underground engineering experience

    Energy Technology Data Exchange (ETDEWEB)

    Holzer, F [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1969-07-01

    Results pertinent to the use of nuclear explosives in underground engineering applications have been accumulating for the past 10 years from the Plowshare and Weapons tests of the AEC. Thus, predictive and measurement techniques of shock effects and chimney formation were developed in the course of analyzing explosions in granite, salt, and dolomite. The ability to predict effects related specifically to safety has resulted from many measurements on detonations at the Nevada Test Site, where also many of the techniques for handling, emplacing, and firing the explosive have been developed. This gestation period culminated in the execution of Project Gasbuggy, jointly sponsored by industry and government, and the first nuclear explosion in a gasbearing formation. The Gasbuggy explosive had a nominal yield of 25 kt and was detonated 4240 ft below the surface in the San Juan Basin in northwestern New Mexico on December 10, 1967. The shot point was 40 ft below the lower boundary of a 285-ft-thick gas-bearing sandstone formation of very low permeability. No radioactive venting occurred, and no damage to surrounding gas wells or structures resulted. Post-shot geophysical exploration and gas production tests have revealed that the nuclear explosion created a subsurface chimney approximately 160 ft in diameter and 335 ft high. Fractures appear to extend to about 400 ft symmetrically from the detonation point, with shifts or offsets along geological weaknesses extending out to perhaps 750 ft. Presently, radioactive constituents in the gas consist of tritium and krypton-85, with concentrations of approximately 10 {mu}Ci/ft{sup 3} and 1.5 {mu}Ci/ft{sup 3} respectively. These concentrations are decreasing a gas withdrawn from the chimney is replaced by formation gas. Tests to evaluate the increase in productivity and ultimate recovery are currently in progress. (author)

  14. Summary of results of underground engineering experience

    International Nuclear Information System (INIS)

    Holzer, F.

    1969-01-01

    Results pertinent to the use of nuclear explosives in underground engineering applications have been accumulating for the past 10 years from the Plowshare and Weapons tests of the AEC. Thus, predictive and measurement techniques of shock effects and chimney formation were developed in the course of analyzing explosions in granite, salt, and dolomite. The ability to predict effects related specifically to safety has resulted from many measurements on detonations at the Nevada Test Site, where also many of the techniques for handling, emplacing, and firing the explosive have been developed. This gestation period culminated in the execution of Project Gasbuggy, jointly sponsored by industry and government, and the first nuclear explosion in a gasbearing formation. The Gasbuggy explosive had a nominal yield of 25 kt and was detonated 4240 ft below the surface in the San Juan Basin in northwestern New Mexico on December 10, 1967. The shot point was 40 ft below the lower boundary of a 285-ft-thick gas-bearing sandstone formation of very low permeability. No radioactive venting occurred, and no damage to surrounding gas wells or structures resulted. Post-shot geophysical exploration and gas production tests have revealed that the nuclear explosion created a subsurface chimney approximately 160 ft in diameter and 335 ft high. Fractures appear to extend to about 400 ft symmetrically from the detonation point, with shifts or offsets along geological weaknesses extending out to perhaps 750 ft. Presently, radioactive constituents in the gas consist of tritium and krypton-85, with concentrations of approximately 10 μCi/ft 3 and 1.5 μCi/ft 3 respectively. These concentrations are decreasing a gas withdrawn from the chimney is replaced by formation gas. Tests to evaluate the increase in productivity and ultimate recovery are currently in progress. (author)

  15. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  16. Siting Conflicts in Renewable Energy Projects in Sweden: Experiences From the Siting of a Biogas Plant

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Jamil

    2001-05-01

    This paper seeks to contribute to an increased understanding of what characterises conflicts regarding the siting of renewable energy facilities. The paper starts out with a brief introduction to different types of renewable energy and the conflicts they might generate as well as a discussion about the differences and similarities in comparison with conflicts over more controversial issues, such as nuclear plants, chemical factories and the construction of roads. The main part of the paper discusses the results from a case study on a failed attempt to site a biogas plant in southern Sweden. The results show that there was a lack of public participation in the early stages of planning, and that peoples negative perceptions of the possibilities to influence the decision-making and of the attitude of the developer, contributed to the development of a public opposition and a polarisation of the conflict. There is also a discussion about the reasons for a shift in the political support for the project and about the role of the legislation in shaping planning processes that either handle conflicts or make them worse. The paper concludes with the observation that the biogas case, in many ways, resembled traditional siting conflicts and that further research is needed to explore the nature of different renewable energy siting conflicts.

  17. CAREM-25. Project recovery plan of the site at Lima

    International Nuclear Information System (INIS)

    De Arenaza, Ignacio J.

    2009-01-01

    In a current global context where the pro-environmental, preservation and recycling trends are more and more strong and influential, it was decided to lay out the CAREM-25 Reactor in the Site of the ex PEAP (Heavy Water Experimental Plant) at Lima (Province of Buenos Aires). This is the reason why it was decided to recover the great part of the facilities located in that Site for the current Project; not only to be used during the construction period but also for the subsequent operation of the CAREM-25 Nuclear Power Plant. Likewise, it was proposed to project the 'Nuclear Power Plants Services Centre', which will provide services to the power plants located in the area. On the other hand, with the transference of the Site it was also 'inherited' an environmental liability, whose dangerousness or harmfulness should have been evaluated. Given that CAREM-25 prototype is presented as a non-pollutant, innovative and next generation alternative, it is the intention of the Management to remedy those potentially dangerous environmental situations. During year 2003 the ex PEAP was dismantled, and the great part of its civil works where retained (buildings, basis, pools, sheds). Most of these facilities will be recycled to satisfy the new uses. The before mentioned recovery was put forward in such a way to pursue some basic guidelines, such as: a)To maintain the historical origin of the buildings; b)To consolidate the condition of the facility as a prototype; c)To confirm the environmentally friendly condition of the CAREM-25 Project. In addition to the adaptation and renovation of the buildings persistent of the ex PEAP, it will be reused the sanitary and services infrastructure, whose adaptation should be to respond to the amount of personnel expected both for the carrying out of the construction and the future operation condition of the plant and the operation of the Services Centre. The remaining fire facilities, which are of vital importance in this kind of projects

  18. Site specific statutory compliance planning for the salt repository project at the Deaf Smith County Site, Texas: Requirements, strategy, and status: Revision 4

    International Nuclear Information System (INIS)

    1986-06-01

    This document and the requirements and actions it presents are addressed to the Deaf Smith County Site, Texas. The proposed actions upon which the plan is based are those described in Chapters 4 and 5 of the final EA for the site. Similarly, the environmental and health and safety requirements covered in the plan are those identified in the EA as being potentially applicable to the salt repository project at the Deaf Smith site. 12 figs., 8 tabs

  19. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  20. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  1. Yucca Mountain Site Characterization Project Waste Package Plan

    International Nuclear Information System (INIS)

    Harrison-Giesler, D.J.; Jardine, L.J.

    1991-02-01

    The goal of the US Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP) waste package program is to develop, confirm the effectiveness of, and document a design for a waste package and associated engineered barrier system (EBS) for spent nuclear fuel and solidified high-level nuclear waste (HLW) that meets the applicable regulatory requirements for a geologic repository. The Waste Package Plan describes the waste package program and establishes the technical approach against which overall progress can be measured. It provides guidance for execution and describes the essential elements of the program, including the objectives, technical plan, and management approach. The plan covers the time period up to the submission of a repository license application to the US Nuclear Regulatory Commission (NRC). 1 fig

  2. Determining the explosion effects on the Gasbuggy reservoir from computer simulation of the postshot gas production history

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Leo A [El Paso Natural Gas Company (United States)

    1970-05-01

    Analysis of the gas production data from Gasbuggy to deduce reservoir properties outside the chimney is complicated by the large gas storage volume in the chimney because the gas flow from the surrounding reservoir into the chimney cannot be directly measured. This problem was overcome by developing a chimney volume factor F (M{sup 2}CF/PSI) based upon analysis of rapid drawdowns during the production tests. The chimney volume factor was in turn used to construct the time history of the required influx of gas into the chimney from the surrounding reservoir. The most probable value of F to describe the chimney is found to be 0.150 M{sup 2}CF/PSI. Postulated models of the reservoir properties outside the chimney are examined by calculating the pressure distribution and flow of gas through the reservoir with the experimentally observed chimney pressure history applied to the cavity wall. The calculated influx from the reservoir into the chimney is then compared to the required influx and the calculated pressure at a radius of 300 feet is compared to the observed pressures in a shut-in satellite well (GB-2RS) which intersects the gas-bearing formation 300 feet from the center of the chimney. A description of the mathematics in the computer program used to perform the calculations is given. Gas flow for a radial model wherein permeability and porosity are uniform through the gas producing sand outside the chimney was calculated for several values of permeability. These calculations indicated that for the first drawdown test (July 1968) the permeability-producing height product (kh) was in the region of 15 to 30 millidarcy-feet (md-ft) and that after several months of testing, the effective kh had dropped to less than 8 md-ft. Calculations wherein (1) the permeability decreases from the chimney out to the 'fracture' radius, and (2) an increased production height is used near the chimney, match the data better than the simple radial model. Reasonable fits to the data for

  3. Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-11-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented

  4. Control of tracers, fluids, and materials for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1993-01-01

    This paper describes use and control of tracers, fluids, and materials (TFM) at the Yucca Mountain Site Characterization Project, Management of TFM is necessary to ensure that site characterization activity does not introduce TFM that may have impact on Yucca Mountain's ability to isolate high-level radioactive waste from the accessible environment. All participants must identify TFM used for testing and construction and have the TFM evaluated to ascertain any impact on waste isolation capabilities of the site or on adjacent tests. Two data bases are created to track TFM: a working data base managed by Los Alamos National Lab. and a permanent data base managed by EG ampersand G, which will contain information on actual TFM used

  5. Off-site source recovery project case study: disposal of high activity cobalt 60 sources at the Nevada test site 2008

    International Nuclear Information System (INIS)

    Cocina, Frank G.; Stewart, William C.; Wald-Hopkins, Mark; Hageman, John P.

    2009-01-01

    The Off-Site Source Recovery Project has been operating at Los Alamos National Laboratory since 1998 to address the U.S. Department of Energy responsibility for collection and management of orphaned or disused radioactive sealed sources which may represent a risk to public health and national security if not properly managed.

  6. Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida

    Energy Technology Data Exchange (ETDEWEB)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.; Walker, Brian K., Ph.D.; Reed, John K., Ph.D.

    2012-02-28

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight

  7. Salt repository project site study plan for water resources: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs

  8. Technical data management at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-01-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner

  9. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  10. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  11. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  12. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  13. Completion report for the UMTRA Project Vitro Processing Site. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approved design and that all US Environmental Protection Agency (EPA) standards have been satisfied. Included as appendixes to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawings, the EPA standards (40 CFR Part 192); the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objective of the remedial action at Salt Lake City is to remove the tailings from the Vitro processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. The final remedial action plan (RAP), which is approved by the US Department of Energy (DOE) and concurred upon by the US Nuclear Regulatory Commission (NRC) and the state of Utah, contains the conceptual design used to develop the final approved design. During remedial action construction operations, conditions were encountered that required design features that differed from the conceptual design. These conditions and the associated design changes are noted in the record drawings. All remedial action activities were completed in conformance with the specifications and drawings; the record drawings, in the state of Utah's opinion, reflect an accurate depiction of the existing property conditions at the processing site. 25 refs., 3 figs., 22 tabs

  14. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    International Nuclear Information System (INIS)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland

  15. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland.

  16. Probabilistic 21st and 22nd Century Sea-Level Projections at a Global Network of Tide-Gauge Sites

    Science.gov (United States)

    Kopp, Robert E.; Horton, Radley M.; Little, Christopher M.; Mitrovica, Jerry X.; Oppenheimer, Michael; Rasmussen, D. J.; Strauss, Benjamin H.; Tebaldi, Claudia

    2014-01-01

    Sea-level rise due to both climate change and non-climatic factors threatens coastal settlements, infrastructure, and ecosystems. Projections of mean global sea-level (GSL) rise provide insufficient information to plan adaptive responses; local decisions require local projections that accommodate different risk tolerances and time frames and that can be linked to storm surge projections. Here we present a global set of local sea-level (LSL) projections to inform decisions on timescales ranging from the coming decades through the 22nd century. We provide complete probability distributions, informed by a combination of expert community assessment, expert elicitation, and process modeling. Between the years 2000 and 2100, we project a very likely (90% probability) GSL rise of 0.5–1.2?m under representative concentration pathway (RCP) 8.5, 0.4–0.9?m under RCP 4.5, and 0.3–0.8?m under RCP 2.6. Site-to-site differences in LSL projections are due to varying non-climatic background uplift or subsidence, oceanographic effects, and spatially variable responses of the geoid and the lithosphere to shrinking land ice. The Antarctic ice sheet (AIS) constitutes a growing share of variance in GSL and LSL projections. In the global average and at many locations, it is the dominant source of variance in late 21st century projections, though at some sites oceanographic processes contribute the largest share throughout the century. LSL rise dramatically reshapes flood risk, greatly increasing the expected number of “1-in-10” and “1-in-100” year events.

  17. Archaeological Investigations at Sites 45-OK-287 and 45-OK-288, Chief Joseph Dam Project, Washington.

    Science.gov (United States)

    1984-01-01

    cells dis- closed six prehistoric components contained in overbank, colluvial and aeoi ian deposits. The first occupation, dated prior to 4800 B.P...location, colluvial and aeoi Ian deposition have been relatively more Important at the site than at many other * project sites. The sites are at the...varying contib’itlons of colluvium, slopewash, and aeoi Ian sedimensts (Tables 2-3 and 2-4). All of the * cultural zones are associated with deposits above

  18. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  19. Environmental project and public space rehabilitation: the great project for the historic center of Naples Unesco World Heritage Site

    Directory of Open Access Journals (Sweden)

    Mario Losasso

    2014-05-01

    Full Text Available “Historic Centre of Naples, World Heritage Site Enhancement” project has as its goal the rehabilitation of the oldest part of the historic center of Naples, one of the largest and most representative of Europe. The research reference field is placed on the level of strategic approach to the project and process management downstream of EU funding in large cities, with particular multidisciplinary relevance and urban issues of a complex nature. The scientific products of study, training and research were collected in Guidelines for the rehabilitation of public spaces and for sustainable performance of interventions on roads, walkways, squares and urban facilities.

  20. Application of QA grading to Yucca Mountain Site Characterization Project items and activities

    International Nuclear Information System (INIS)

    Murthy, R.B.; Smith, S.C.

    1991-01-01

    Grading is the act of selecting the quality assurance (QA) measures necessary to develop and maintain confidence in the quality of an item or activity. The list of QA measures from which this selection is made are the 20 criteria of the Yucca Mountain Site Characterization Project Quality Assurance Requirements Document

  1. Application of biosphere models in the Biomosa project: a comparative assessment of five European radioactive waste disposal sites

    International Nuclear Information System (INIS)

    Kowe, R.; Mobbs, S.; Proehl, G.; Bergstrom, U.; Kanyar, B.; Olyslaegers, G.; Zeevaert, T.; Simon, I.

    2004-01-01

    The BIOMOSA (Biosphere Models for Safety Assessment of Radioactive Waste Disposal) project is a part of the EC fifth framework research programme. The main goal of this project is the improvement of the scientific basis for the application of biosphere models in the framework of long-term safety studies of radioactive waste disposal facilities. Furthermore, the outcome of the project will provide operators and regulatory bodies with guidelines for performance assessments of repository systems. The study focuses on the development and application of site-specific models and a generic biosphere tool BIOGEM (Biosphere Generic Model), using the experience from the national programmes and the IAEA BIOMASS reference biosphere methodology. The models were applied to 5 typical locations in the EU, resulting in estimates of the annual individual doses to the critical groups and the ranking of the importance of the pathways for each of the sites. The results of the site-specific and generic models were then compared. In all cases the doses calculated by the generic model were less than the doses obtained from the site-specific models. Uncertainty in the results was estimated by means of stochastic calculations which allow a comparison of the overall model uncertainty with the variability across the different sites considered. (author)

  2. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993

  3. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  4. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  5. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project's (YMP's) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis

  6. Nondestructive Examination Equipment in the Hanford Site WRAP 1 and Retrieval Project

    International Nuclear Information System (INIS)

    Keve, J.K.; Weber, J.R.

    1994-08-01

    The Waste Receiving and Processing Facility, Module 1 (WRAP-1) is currently under construction at the Hanford Nuclear Site in south-central Washington Stage. The facility is scheduled to begin operation in 1996. Its mission is to annually receive more than 6,800 55-gallon drums of both newly generated and retrieved contact-handled solid waste and prepare them for certification and disposal. WRAP 1, the Nondestructive Examination (NDE) System has two primary functions: To identify the presence or verify the absence of non-compliant materials in the un-manifested, retrieved drums, and to certify that all outgoing drums of TRU waste (newly generated and processed) are free of liquids and other non-compliant items. The Solid Waste Retrieval Facility, Phase 1 Project will unearth and recover the first 10,000 of 38,000 drums of suspect TRU waste buried between 1970 and 1985 for which no detailed contents manifests exist. Follow-on projects will recover the balance of the buried drums. To resolve safely issues about storing the newly unearthed drums, the containers and contents will be examined at the recovery site before the containers are placed in storage facilities

  7. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  8. Gnome site decontamination and decommissioning project radiation contamination clearance report, March 28, 1979-September 23, 1979

    International Nuclear Information System (INIS)

    Berry, H.A.

    1981-08-01

    This report describes the operations and radiological activities conducted during Phase II and Phase III of the Gnome site decontamination and decommissioning (D/D) project in Carlsbad, New Mexico. The onsite radiological monitoring and documentation activities were performed for the Department of Energy, Nevada Operations (DOE/NV) by Reynolds Electrical and Engineering Co., Inc. (REECo) and EG and G, Inc., from March 28, 1979 to September 23, 1979. The monitoring program included soil sampling and analyses, portable instrument area surveys, thermoluminescent dosimeter (TLD) measurements and a post-operational aerial survey to document the final site status and to insure public and occupational health and safety. Although the analysis of data gathered during the final stages of the D/D project will provide the information necessary for DOE to return the Gnome site to the Department of the Interior, Bureau of Land Management (BLM) for unrestricted use of the land surface, there are permanent restrictions on excavation and/or drilling on the site at any depth between the surface and 1500 feet

  9. Completion of the uranium mill tailings remedial project and cleanup of the former mill site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    Rael, G.J.; Cox, S.W.; Artiglia, E.W.

    2000-01-01

    The United States Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Surface Project has successfully completed the cleanup of 22 former uranium mill sites, more than 5400 vicinity properties, and has constructed 18 entombment cells. The Project has recently received the United States Nuclear Regulatory Commission's approval and certification for the last two disposal sites, with these sites being placed under the general license for long term custodial care of residual radioactive material. The UMTRA site located at Grand Junction, Colorado is a good example of the technical, political, economic, and public relations challenges that were overcome in achieving success. The UMTRA Team discussed, negotiated, planned, and eventually acted on this uranium mill tailings problem and brought the project to a successful conclusion for the community. From the early 1940s through the 1970s, uranium ore was mined in significant quantities under United States federal contracts for the government's national defence programmes, i.e. the Manhattan Engineering District and Atomic Energy Commission programmes. The problem started as the need for uranium decreased in the late 1960s, resulting in mills shutting down, leaving behind large quantities of process waste tailings and contaminated mill buildings. The former Climax Uranium Company mill site in Grand Junction was one of the largest of these sites. (author)

  10. Hydrocarbon production with nuclear explosives

    International Nuclear Information System (INIS)

    Wade Watkins, J.

    1970-01-01

    The tremendous energy of nuclear explosives and the small dimensions of the explosive package make an ideal combination for drill-hole explosive emplacement in deep, thick hydrocarbon deposits. Potential applications exist in fracturing low permeability natural-gas and petroleum formations for stimulating production, fracturing oil shale to permit in situ retorting, and creating storage chimneys for natural gas, liquefied petroleum gas, petroleum, petroleum products, helium, and other fluids. Calculations show, for example, that less than 100 shots per year would be needed to stabilize the natural gas reserves to production ratio. Under the Government-industry Plowshare program, two experiments, Projects Gasbuggy and Rulison, were conducted to stimulate natural gas production from low-permeability formations. Incomplete information indicates that both were technically successful. Potential problems associated with the use of nuclear explosives for underground engineering applications are radioactive contamination, maximum yield limitations, high costs of detonating contained nuclear explosives, and adverse public opinion. Results at Project Gasbuggy and other considerations indicated that the problem of radioactive contamination was about as predicted and not an insurmountable one. Also, it was demonstrated that shots at adequate depths could be detonated without appreciable damage to existing surface and subsurface buildings, natural features, and equipment. However, costs must be reduced and the public must be better informed before these techniques can be widely used in field operations. On the basis of present knowledge, the potential of nuclear-explosive stimulation of hydrocarbon production appears good. Additional field experiments will be required to adequately explore that potential. (author)

  11. Hydrocarbon production with nuclear explosives

    Energy Technology Data Exchange (ETDEWEB)

    Wade Watkins, J [Petroleum Research, Bureau of Mines, U.S. Department of the Interior, Washington, DC (United States)

    1970-05-01

    The tremendous energy of nuclear explosives and the small dimensions of the explosive package make an ideal combination for drill-hole explosive emplacement in deep, thick hydrocarbon deposits. Potential applications exist in fracturing low permeability natural-gas and petroleum formations for stimulating production, fracturing oil shale to permit in situ retorting, and creating storage chimneys for natural gas, liquefied petroleum gas, petroleum, petroleum products, helium, and other fluids. Calculations show, for example, that less than 100 shots per year would be needed to stabilize the natural gas reserves to production ratio. Under the Government-industry Plowshare program, two experiments, Projects Gasbuggy and Rulison, were conducted to stimulate natural gas production from low-permeability formations. Incomplete information indicates that both were technically successful. Potential problems associated with the use of nuclear explosives for underground engineering applications are radioactive contamination, maximum yield limitations, high costs of detonating contained nuclear explosives, and adverse public opinion. Results at Project Gasbuggy and other considerations indicated that the problem of radioactive contamination was about as predicted and not an insurmountable one. Also, it was demonstrated that shots at adequate depths could be detonated without appreciable damage to existing surface and subsurface buildings, natural features, and equipment. However, costs must be reduced and the public must be better informed before these techniques can be widely used in field operations. On the basis of present knowledge, the potential of nuclear-explosive stimulation of hydrocarbon production appears good. Additional field experiments will be required to adequately explore that potential. (author)

  12. Los Alamos National Laboratory Yucca Mountain Site Characterization Project: 1991 quality program status report

    International Nuclear Information System (INIS)

    1992-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project's (YMP) quality assurance program for calendar year 1991. The report is divided into three Sections: Program Activities, Verification Activities, and Trend Analysis

  13. Conceptual Design Report: Nevada Test Site Mixed Waste Disposal Facility Project

    International Nuclear Information System (INIS)

    2009-01-01

    Environmental cleanup of contaminated nuclear weapons manufacturing and test sites generates radioactive waste that must be disposed. Site cleanup activities throughout the U.S. Department of Energy (DOE) complex are projected to continue through 2050. Some of this waste is mixed waste (MW), containing both hazardous and radioactive components. In addition, there is a need for MW disposal from other mission activities. The Waste Management Programmatic Environmental Impact Statement Record of Decision designates the Nevada Test Site (NTS) as a regional MW disposal site. The NTS has a facility that is permitted to dispose of onsite- and offsite-generated MW until November 30, 2010. There is not a DOE waste management facility that is currently permitted to dispose of offsite-generated MW after 2010, jeopardizing the DOE environmental cleanup mission and other MW-generating mission-related activities. A mission needs document (CD-0) has been prepared for a newly permitted MW disposal facility at the NTS that would provide the needed capability to support DOE's environmental cleanup mission and other MW-generating mission-related activities. This report presents a conceptual engineering design for a MW facility that is fully compliant with Resource Conservation and Recovery Act (RCRA) and DOE O 435.1, 'Radioactive Waste Management'. The facility, which will be located within the Area 5 Radioactive Waste Management Site (RWMS) at the NTS, will provide an approximately 20,000-cubic yard waste disposal capacity. The facility will be licensed by the Nevada Division of Environmental Protection (NDEP)

  14. The SKI SITE-94 Project: An International Peer Review Carried out by an OECD/NEA Team of Experts

    International Nuclear Information System (INIS)

    Sagar, Budhi; Devillers, C.; Smith, Paul; Laliuex, P.; Pescatore, C.

    1997-10-01

    The recently completed SITE-94 project is an SKI effort directed at building competence and capacity in the assessment of safety of a spent-fuel geologic repository. Emphasis is given to the assimilation of site-specific data, with its associated uncertainties, into the performance assessment. Specific attention is also given to improving the understanding of mechanisms that might compromise canister integrity. This report represents the common views of an International Review Team (IRT) established by the NEA Secretariat, at the request of SKI, to perform a peer review of SITE-94. The basis for the report is the understanding of SITE-94 and its background obtained by IRT in the course of several months of study of SITE-94 documentation, internal discussions and a meeting with SKI in Stockholm. The report is limited to the main findings of IRT. The intended audience of the report is the staff of SKI and, accordingly, the style of the report is suited to a technical audience familiar with the contents of the SITE-94 project

  15. A preliminary assessment of the radiological implications of commercial utilization of natural gas from a nuclearly stimulated well

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, D G; Struxness, E G [Health Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN (United States); Bowman, C R [El Paso Natural Gas Company, El Paso, TX (United States)

    1970-05-01

    Widespread utilization of nuclear explosives, in conjunction with the natural gas industry, can result in radiation exposure of sizable population groups. It is prudent to make realistic assessments of such potential radiation exposures before they occur and, unless the expected exposures are clearly insignificant, to consider these exposures in evaluating the net benefit of this particular use of nuclear energy. All pertinent facts relating to such assessments should be made public and presented in such a way that those who are to assume the risks, if any, can make a reasonable judgment as to whether the risks are acceptable. Radioactivity in natural gas from the Gasbuggy cavity has been analyzed prior to and during flaring operations. None of this gas has entered the collection and distribution system, but a theoretical analysis has been made of the hypothetical impact on members of the public that would have occurred if the gas had been introduced into the commercial stream. Dose equivalents have been estimated for both workers and consumers. In this analysis, Gasbuggy gas has been traced through a real gas-collection system and processing plant, as represented by the present situation existing in the San Juan Production Division, El Paso Natural Gas Company. In addition, a number of considerations are presented which would apply to radiation exposure in metropolitan areas. Results of this analysis for the Gasbuggy well indicate hypothetical dose equivalents to various population groups to be well within the annual dose limits suggested by the International Commission on Radiological Protection. Projection to a steady-state situation involving extensive natural gas production from many producing wells also resulted in hypothetical dose equivalents within the annual dose limits. Simple extrapolation of the results from this analysis to potential exposures resulting from nuclear stimulation of other gas reservoirs cannot be made on a direct basis, but this method

  16. A preliminary assessment of the radiological implications of commercial utilization of natural gas from a nuclearly stimulated well

    International Nuclear Information System (INIS)

    Jacobs, D.G.; Struxness, E.G.; Bowman, C.R.

    1970-01-01

    Widespread utilization of nuclear explosives, in conjunction with the natural gas industry, can result in radiation exposure of sizable population groups. It is prudent to make realistic assessments of such potential radiation exposures before they occur and, unless the expected exposures are clearly insignificant, to consider these exposures in evaluating the net benefit of this particular use of nuclear energy. All pertinent facts relating to such assessments should be made public and presented in such a way that those who are to assume the risks, if any, can make a reasonable judgment as to whether the risks are acceptable. Radioactivity in natural gas from the Gasbuggy cavity has been analyzed prior to and during flaring operations. None of this gas has entered the collection and distribution system, but a theoretical analysis has been made of the hypothetical impact on members of the public that would have occurred if the gas had been introduced into the commercial stream. Dose equivalents have been estimated for both workers and consumers. In this analysis, Gasbuggy gas has been traced through a real gas-collection system and processing plant, as represented by the present situation existing in the San Juan Production Division, El Paso Natural Gas Company. In addition, a number of considerations are presented which would apply to radiation exposure in metropolitan areas. Results of this analysis for the Gasbuggy well indicate hypothetical dose equivalents to various population groups to be well within the annual dose limits suggested by the International Commission on Radiological Protection. Projection to a steady-state situation involving extensive natural gas production from many producing wells also resulted in hypothetical dose equivalents within the annual dose limits. Simple extrapolation of the results from this analysis to potential exposures resulting from nuclear stimulation of other gas reservoirs cannot be made on a direct basis, but this method

  17. Status of the ground water flow model for the UMTRA Project, Shiprock, New Mexico, site

    International Nuclear Information System (INIS)

    1995-01-01

    A two-dimensional numerical model was constructed for the alluvial aquifer in the area of the Uranium Mill Tailings Remedial Action (UMTRA) Project Shiprock, New Mexico, site. This model was used to investigate the effects of various hydrologic parameters on the evolution of the ground water flow field. Results of the model are useful for defining uncertainties in the site conceptual model and suggesting data collection efforts to reduce these uncertainties. The computer code MODFLOW was used to simulate the two-dimensional flow of ground water in the alluvium. The escarpment was represented as a no-flow boundary. The San Juan River was represented with the MODFLOW river package. A uniform hydraulic conductivity distribution with the value estimated by the UMTRA Project Technical Assistance Contractor (TAC) and a uniform recharge distribution was used. Infiltration from the flowing artesian well was represented using the well package. The ground water flow model was calibrated to ground water levels observed in April 1993. Inspection of hydrographs shows that these levels are representative of typical conditions at the site

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. Behavior of radionuclides in nuclear gas stimulation applications

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Jr, C F [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    The Gasbuggy experiment has presented a unique opportunity to investigate the behavior of radionuclides over an extended period of time in a somewhat unusual environment. In addition to the obvious practical utility of this investigation for Plowshare applications, the information gained has value of a purely scientific nature. Both aspects of the Gas Quality program for Gasbuggy are discussed in this presentation. The study of Gasbuggy results is divided into two distinct periods, according to the field operations. During the initial six months following detonation, the chimney reentry well was shut-in, and the nuclear chimney served as a chemical and radiochemical reaction vessel. A detailed examination of the concentrations and specific activities of tritium and C{sup 14} is presented as a function of the changing chemical composition of the chimney gas and as a function of time. The effects of radiochemical exchange reactions, together with the tritium isotope effect, are demonstrated. Following this shut-in period, a series of production and flushing tests was conducted. During these experiments, the chimney gas composition was seen to change about as would be expected due to dilution of the chimney gas with formation gas. An examination of radionuclide concentrations and specific activities during the production tests demonstrated the relative unimportance of isotopic exchange and chemical reactions during this period, as compared to the early shut-in periods. Within the limitations of the Gasbuggy experience a generalized model of the behavior of tritium and C{sup 14} can be deduced. The discussion involves estimation of initial distribution of activities, the effects of chemical reactions and isotopic exchange on this distribution, and the importance of the environment in determining the level of radioactivity contamination to be expected. (author)

  3. Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.

    Science.gov (United States)

    Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J

    2016-04-01

    Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.

  4. Supplement to the site observational work plan for the UMTRA Project Site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1996-02-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of (1) the average linear velocity of the ground water in the alluvium; (2) the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale; and (3) the fate and transport of contaminants from the uppermost aquifer to the Westwater Canyon Member of the Morrison Formation. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Shale unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. Figure 1 is a geologic cross section depicting the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Table 1 presents hydrogeologic information of each hydrostratigraphic unit

  5. Estimation of expenses for low and intermediate level radioactive waste repository project in Croatia up to site license acquisition

    International Nuclear Information System (INIS)

    Schaller, A.; Lokner, V.; Subasic, D.

    2003-01-01

    The expenses needed for development of low- and intermediate level radioactive waste (LILW) repository project in Croatia include: (a) preliminary activities, (b) preparatory activities, and (c) preparing of environmental impact study. The first group of expenses are referring to the project leading activities, project plan updating, build-up of required infrastructure, preparing of licensing documentation, site investigations, data acquisition programme, pre-operational radio-ecological monitoring, modelling, safety analysis (first iteration) and public related activities. Preparatory activities are referring to purchasing of land for repository and preparatory activities for carrying out of on-site investigations, while third group of expenses are related to preparation and validation of Environmental impact study. It was found out that about 50 % of total expenses refer to build-up of infrastructure. Additional 25 % finances are related to radio-ecological monitoring, site investigations and development of calculations and models, while remaining 25 % of total estimated sum is expected to be spent for repository safety assessment, public relations, purchasing and preparing the on-site terrain for construction, etc. It was calculated 607 EUR per m3 of LILW to be needed up to site license acquisition. According to the world-wide practice, by extrapolating of additional expenses necessary for construction of the repository and acquisition of operational license, it comes out the cost of 1.723 EUR per m3 of LILW for shallow-ground and 2.412 EUR per m3 of LILW for tunnel repository. The estimated expenses for Croatia are within the span of expenses for the same purpose in the countries considered. Expected duration of the project performance up to acquisition of the site license is 4 years and 3 months. (author)

  6. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  7. Surface and subsurface cleanup protocol for radionuclides Gunnison, Colorado, UMTRA Project Processing Site

    International Nuclear Information System (INIS)

    1994-05-01

    The supplemental standards provisions of Title 40, Code of Federal Regulations, Part 192 (40 CFR Part 192) require the cleanup of radionuclides other than radium-226 (Ra-226) to levels ''as low as reasonably achievable'' (ALARA), taking into account site-specific conditions, if sufficient quantities and concentrations are present to constitute a significant radiation hazard. In this context, thorium-230 (Th-230) at the Gunnison, Colorado, processing site will require remediation. However, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Characterization data indicate that in the offpile areas, the removal of residual in situ bulk Ra-226 and Th-230 such that the 1000-year projected Ra-226 concentration (Ra-226 concentration in 1000 years due to the decay of in situ Ra-226 and the in-growth of Ra-226 from in situ Th-230) complies with the US Environmental Protection Agency (EPA) cleanup standard for in situ Ra-226 and the cleanup protocol for in situ Th-230 can be readily achieved using conventional excavation techniques for bulk contamination without encountering significant impacts due to groundwater. The EPA cleanup standard and criterion for Ra-226 and the 1000-year projected Ra-226 are 5 and 15 picocuries per gram (pCi/g) above background, respectively, averaged over 15-centimeter (cm) deep surface and subsurface intervals and 100-square-meter (m 2 ) grid areas. Significant differential migration of Th-230 relative to Ra-226 has occurred over 40 percent of the subpile area. To effectively remediate the site with respect to Ra-226 and Th-230, supplemental standard is proposed and discussed in this report

  8. Quarry geotechnical report for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-11-01

    This report has been prepared for the United States Department of Energy's (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which is MK-Ferguson Company (MK-Ferguson) with Jacobs Engineering Group (JEG) as its designated subcontractor. The Weldon Spring site (WSS) comprises the Weldon Spring quarry area and the Weldon Spring chemical plant and raffinate pit areas. This report presents the results of geotechnical investigations conducted during 1989--1990 at the proposed Weldon Spring quarry staging and water treatment facilities in the quarry area. The facilities are intended for treatment of water removed from the quarry area. An access road and a decontamination pad will be necessary for handling and transportation of bulk waste. Results of previous geotechnical investigations performed by other geoscience and environmental engineering firms in the quarry area, were reviewed, summarized and incorporated into this report. Well logging, stratigraphy data, piezometer data, elevations, and soil characteristics are also included

  9. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  10. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  11. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2002-01-01

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA)

  12. Long-Term Hydrologic Monitoring Program. Project Shoal site, Sand Springs Range, Churchill County, Nevada

    International Nuclear Information System (INIS)

    1984-05-01

    The Shoal site is located in Churchill County in the northern part of the Sand Springs Range, approximately 30 miles (48.3 kilometers) southeast of Fallon, Nevada. Project Shoal, with a yield of 12 kilotons, was detonated October 26, 1963. It was conducted as part of the Vela program to obtain event measurements relating to the detection of underground nuclear detonations. The purpose of the Long-Term Hydrologic Monitoring Program at the Shoal site is to obtain data that will assure public safety; inform the public, the news media, and the scientific community relative to radiological contamination; and to document compliance with federal, state, and local antipollution requirements. The Shoal site geographical setting, climate, geology, and hydrology are described. Site history, including Shoal event information and Shoal monitoring is described. The final radiological surveys following the Shoal site cleanup described in this report indicate that there are no radiation levels above natural background on or near the land surface and that no hazard exists or is likely to occur during public use of the surface of the Shoal site. The Long-Term Hydrologic Monitoring Program for the Shoal site is described. 17 references, 4 figures

  13. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  14. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of senior YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. Nuclear project sites on Shimokita Peninsula in summer 1989

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The present report outlines the current progress in the nuclear projects implemented on the Shimokita Peninsula. At Rokkashomura, Japan Nuclear Fuel Industries is building a uranium enrichment plant. The basic work began in October 1988 and was completed by the end of May, and building work on the plant began. The plant building construction has now progressed to 50% for the first unit of 150,000 SUW/year. The site for the low level radioactive waste storage facility is still flat ground. For the reprocessing plant, Japan Nuclear Fuel Service's permit for waste management business is still before STA. Only road construction, unrelated to licensing, is going on. The completion of the safety examination for reprocessing is expected around 1991. At Higashidorimura, a fishery cooperative has rejected the proposal of compensation, and the compensation problem is at a stalemate. Following a zig-zag course in political disturbances, the Nuclear Ship Mutsu entered its port at Sekinehama in January 1988. Corrosion dots were found on some of the fuel assemblies, and Japan Atomic Energy Research Institute plans to carry out the recovery work in this autumn. Site acquisition procedures for building an Ohma nuclear power plant are now under way. (N.K.)

  19. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  20. RELIABILITY AND ACCURACY ASSESSMENT OF INVASIVE AND NON- INVASIVE SEISMIC METHODS FOR SITE CHARACTERIZATION: FEEDBACK FROM THE INTERPACIFIC PROJECT

    OpenAIRE

    Garofalo , F.; Foti , S.; Hollender , F.; Bard , P.-Y.; Cornou , C.; Cox , B.R.; Dechamp , A.; Ohrnberger , M.; Sicilia , D.; Vergniault , C.

    2017-01-01

    International audience; The InterPacific project (Intercomparison of methods for site parameter and velocity profile characterization) aims to assess the reliability of seismic site characterization methods (borehole and surface wave methods) used for estimating shear wave velocity (VS) profiles and other related parameters (e.g., VS30). Three sites, representative of different geological conditions relevant for the evaluation of seismic site response effects, have been selected: (1) a hard r...

  1. Nuclear site selection studies

    International Nuclear Information System (INIS)

    Gharib, A.; Zohoorian Izadpanah, A.A.; Iranmanesh, H.

    2000-01-01

    It is of special importance, especially from the nuclear safety viewpoint, to select suitable sites for different nuclear structures with the considered future activities. Site selection sometimes involves high costs not necessarily for merely selecting of site but for some preliminary measures to be taken so as the site may have the necessary characteristics. The more suitable the natural characteristics of the site for the considered project, the more successful and efficient the project, the lower the project costs and the longer the project operation period. If so, the project will cause the growth of public culture and sustainable socioeconomic development. This paper is the result of the conclusion of numerous massive reports of this activity in the preliminary phase based on theories, practices and the related safety principles on this ground as well as the application of data and information of the past and a glance to the future. The conception of need for a site for medium structures and nuclear research projects and how to perform this process are presented step by step here with a scientific approach to its selection during the investigations. In this study, it is practically described how the site is selected, by determining and defining the characteristics of research and nuclear projects with medium structures and also its fitting to the optimum site. The discovered sites typically involve the best advantages in technical and economic aspects and no particular contrast with the concerned structures

  2. Radiation safety study for conventional facility and siting pre project phase of International Linear Collider

    International Nuclear Information System (INIS)

    Sanami, Toshiya; Ban, Syuichi; Sasaki, Shin-ichi

    2015-01-01

    The International Linear Collider (ILC) is a proposed high-energy collider consisting of two linear accelerators, two dumping rings, electron and positron sources, and a single colliding hall with two detectors. The total length and CMS energy of the ILC will be 31 km and 500 GeV, respectively (and 50 km and 1 TeV after future upgrade). The design of the ILC has entered the pre-project phase, which includes site-dependent design. Radiation safety design for the ILC is on-going as a part of conventional facility and siting activities of the pre-project phase. The thickness of a central wall of normal concrete is designed to be 3.5 m under a pessimistic assumption of beam loss. The beam loss scenario is under discussion. Experience and knowledge relating to shielding design and radiation control operational work at other laboratories are required. (authors)

  3. Impact of a decommissioning project on the site area, the federal state, and their economic development

    International Nuclear Information System (INIS)

    Spies, B.G.; Butt, G.M.

    1996-01-01

    Greifswald-Lubmin is a site situated in a border region of Germany, but in the center of eastern Europe and the Baltic countries. The chances of the area are a high vocational qualification of the population and the economic potential opened up by the planned decommissioning of the Greifswald nuclear power plant. A decisive factor for the region's future is to interlace the decommissioning and dismantling activities on site with suitable action taken in support of improvement of the infrastructure and the economic life of the region, as a joint effort of local decision-taking bodies and authorities as well as the Land government. Commitment of private firms from Germany and abroad in the project management and performance of project tasks can contribute valuable stimulation and support. (orig.)

  4. Salt Repository Project site study plan for seismographic monitoring: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the seismographic monitoring activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field programs has been designed to provide data useful in addressing information/data needs resulting from Federal/State/local regulatory requirements and repository program requirements. Sixteen new and three relocated seismographic stations will be added to the now existing network of 13 stations for a total of 32 stations in the network. The areal extent is being expanded and selected regions covered more densely to provide more accurate monitoring and location of microearthquakes. More sophisticated instruments are being used at selected locations to allow for more detailed analysis. A few seismographs are being installed at depth to provide a limited 3-D monitoring network in the area of the repository. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technique Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 32 refs., 11 figs., 4 tabs

  5. Intensive archaeological survey of the F/H Surface Enhancement Project Area, Savannah River Site, Aiken and Barnwell Counties, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Sassaman, K.E.; Gillam, J.C.

    1993-08-01

    Twelve archaeological sites and four artifact occurrences were located by intensive survey of two tracts of land for the F and H Surface Enhancement Project on the Savannah River Site, Aiken and Barnwell Counties, South Carolina. Fieldwork in the 480-acre project area included surface reconnaissance of 3.6 linear kilometers of transects, 140 shovel tests along 4.2 linear kilometers of transects, an additional 162 shovel tests at sites and occurrences, and the excavation of six l {times} 2 m test units. All but one of the sites contained artifacts of the prehistoric era; the twelfth site consists of the remains of a twentieth-century home place. The historic site and six of the prehistoric sites consist of limited and/or disturbed contexts of archaeological deposits that have little research potential and are therefore considered ineligible for nomination to the National Register of Historic Places (NRHP). The remaining five sites have sufficient content and integrity to yield information important to ongoing investigations into upland site use. These sites (38AK146, 38AK535, 38AK539, 38AK541, and 38AK543) are thus deemed eligible for nomination to the NRHP and the Savannah River Archaeological Research Program (SRARP) recommends that they be preserved through avoidance or data recovery.

  6. The ICDP-Hominin Sites and Paleolakes Drilling Project (HSPDP): new data from the Chew Bahir site in Ethiopia

    Science.gov (United States)

    Leng, Melanie; Dean, Jonathan; Asrat, Asfawossen; Cohen, Andrew; Foerster, Verena; Just, Janna; Klasen, Nicole; Lamb, Henry; Schäbitz, Frank; Trauth, Martin; Viehberg, Finn; Wagner, Bernd

    2016-04-01

    There are currently few long, continuous, Pleistocene records from East Africa, meaning it has been difficult to establish the relative influence of low- versus high-latitude forcing on East African climate and climatic conditions at the time of anatomically modern human origin and subsequent dispersal. We have been attempting to address these gaps in our knowledge by analysing lake sediments taken from Chew Bahir, an area of playa mudflats in southern Ethiopia close to the site of the oldest-known anatomically modern human fossils at Omo-Kibish. In March 2014, Chew Bahir was cored to a depth of ~40 metres, and the resulting sediment sequence is estimated to cover the last ~115ka. In December 2014, a nearby site was drilled to a depth of ~280 metres as part of the International Continental scientific Drilling Programme - Hominin Sites and Paleolakes Drilling Project (HSPDP). The oxygen and carbon isotope composition of endogenic calcite and other data from these cores will be presented. The data show some significant changes in water balance variability, the period prior to 70ka appears very unstable with some significant periods of drought and flood. Between 70-20ka the lake was stable and evaporative. The last 20ka years was wetter.

  7. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  8. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  9. Optimal Locations for Siting Wind Energy Projects: Technical Challenges, Economics, and Public Preferences

    Science.gov (United States)

    Lamy, Julian V.

    Increasing the percentage of wind power in the United States electricity generation mix would facilitate the transition towards a more sustainable, low-pollution, and environmentally-conscious electricity grid. However, this effort is not without cost. Wind power generation is time-variable and typically not synchronized with electricity demand (i.e., load). In addition, the highest-output wind resources are often located in remote locations, necessitating transmission investment between generation sites and load. Furthermore, negative public perceptions of wind projects could prevent widespread wind development, especially for projects close to densely-populated communities. The work presented in my dissertation seeks to understand where it's best to locate wind energy projects while considering these various factors. First, in Chapter 2, I examine whether energy storage technologies, such as grid-scale batteries, could help reduce the transmission upgrade costs incurred when siting wind projects in distant locations. For a case study of a hypothetical 200 MW wind project in North Dakota that delivers power to Illinois, I present an optimization model that estimates the optimal size of transmission and energy storage capacity that yields the lowest average cost of generation and transmission (/MWh). I find that for this application of storage to be economical, energy storage costs would have to be 100/kWh or lower, which is well below current costs for available technologies. I conclude that there are likely better ways to use energy storage than for accessing distant wind projects. Following from this work, in Chapter 3, I present an optimization model to estimate the economics of accessing high quality wind resources in remote areas to comply with renewable energy policy targets. I include temporal aspects of wind power (variability costs and correlation to market prices) as well as total wind power produced from different farms. I assess the goal of providing

  10. MODELING OF FLOW AND TRANSPORT INDUCED BY PRODUCTION OF HYDROFRACTURE-STIMULATED GAS WELLS NEAR THE RULISON NUCLEAR TEST

    Energy Technology Data Exchange (ETDEWEB)

    Hodges, Rex A. [Navarro Research and Engineering; Cooper, Clay [Desert Research Inst. (DRI), Reno, NV (United States); Falta, Ronald [Clemson Univ., SC (United States)

    2012-09-17

    The Piceance Basin in western Colorado contains significant reserves of natural gas in poorly connected, low-permeability (tight) sandstone lenses of the Mesaverde Group. The ability to enhance the production of natural gas in this area has long been a goal of the oil and gas industry. The U.S. Atomic Energy Commission, a predecessor agency to the U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission, participated in three tests using nuclear detonations to fracture tight formations in an effort to enhance gas production. The tests were conducted under Project Plowshare, a program designed to identify peaceful, beneficial uses for nuclear devices. The first, Project Gasbuggy, was conducted in 1967 in the San Juan Basin of New Mexico. The two subsequent tests, Project Rulison in 1969 and Project Rio Blanco in 1973, were in the Piceance Basin. The ability to enhance natural gas production from tight sands has become practical through advances in hydraulic fracturing technology (hydrofracturing). This technology has led to an increase in drilling activity near the Rulison site, raising concerns that contamination currently contained in the subsurface could be released through a gas well drilled too close to the site. As wells are drilled nearer the site, the DOE Office of Legacy Management has taken the approach outlined in the June 2010 Rulison Path Forward document (DOE 2010), which recommends a conservative, staged approach to gas development. Drillers are encouraged to drill wells in areas with a low likelihood of encountering contamination (both distance and direction from the detonation zone are factors) and to collect data from these wells prior to drilling nearer the site’s 40 acre institutional control boundary (Lot 11). Previous modeling results indicate that contamination has been contained within Lot 11 (Figure 1). The Path Forward document couples the model predictions with the monitoring of gas and produced water from the gas wells

  11. Annual report on the U.S. Department of Energy's cultural resource activities at Colorado UMTRA Project sites for October 1995--September 1996

    International Nuclear Information System (INIS)

    1996-09-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1995 through September 30, 1996. The inactive uranium mill tailings sites in Colorado are at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of understanding (PMOU). This PMOU requires the DOE to fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report provides the state of Colorado with an annual report on the cultural resource activities performed for all UMTRA Project sites in Colorado. Due to the completion of surface activities at the UMTRA Project sites, this will be the last annual report to the state of Colorado. Cultural resources activities subsequent to this report will be reported to the state through site-specific correspondence

  12. Archive of Core and Site/Hole Data and Photographs from the Deep Sea Drilling Project (DSDP)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Deep Sea Drilling Project (DSDP) operated the D/V GLOMAR CHALLENGER from 1968-1983, drilling 1,112 holes at 624 sites worldwide. The DSDP was funded by the US...

  13. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  14. Recycled Uranium Mass Balance Project Y-12 National Security Complex Site Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    This report has been prepared to summarize the findings of the Y-12 National Security Complex (Y-12 Complex) Mass Balance Project and to support preparation of associated U. S. Department of Energy (DOE) site reports. The project was conducted in support of DOE efforts to assess the potential for health and environmental issues resulting from the presence of transuranic (TRU) elements and fission products in recycled uranium (RU) processed by DOE and its predecessor agencies. The United States government used uranium in fission reactors to produce plutonium and tritium for nuclear weapons production. Because uranium was considered scarce relative to demand when these operations began almost 50 years ago, the spent fuel from U.S. fission reactors was processed to recover uranium for recycling. The estimated mass balance for highly enriched RU, which is of most concern for worker exposure and is the primary focus of this project, is summarized in a table. A discrepancy in the mass balance between receipts and shipments (plus inventory and waste) reflects an inability to precisely distinguish between RU and non-RU shipments and receipts involving the Y-12 Complex and Savannah River. Shipments of fresh fuel (non-RU) and sweetener (also non-RU) were made from the Y-12 Complex to Savannah River along with RU shipments. The only way to distinguish between these RU and non-RU streams using available records is by enrichment level. Shipments of {le}90% enrichment were assumed to be RU. Shipments of >90% enrichment were assumed to be non-RU fresh fuel or sweetener. This methodology using enrichment level to distinguish between RU and non-RU results in good estimates of RU flows that are reasonably consistent with Savannah River estimates. Although this is the best available means of distinguishing RU streams, this method does leave a difference of approximately 17.3 MTU between receipts and shipments. Slightly depleted RU streams received by the Y-12 Complex from ORGDP and

  15. Providing an integrated waste management strategy and operation focused on project end states at the Hanford site

    International Nuclear Information System (INIS)

    Blackford, L.

    2009-01-01

    CH2M HILL Plateau Remediation Company (CHPRC) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Central Plateau of the Hanford Site. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington State. A plutonium production complex with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in the world's largest environmental cleanup project. The Plateau Remediation Contract (PRC) is a 10-year project paving the way for closure of the Hanford Site through demolition of the Plutonium Finishing Plant; remediation of six burial grounds and 11 groundwater systems; treatment of 43.8 meters of sludge; and disposition of 8,200 meters of transuranic waste, 800 spent nuclear material containers, 2,100 metric tons of spent nuclear fuel, and two reactors. The $4.5 billion project, funded through the U.S. DOE Office of Environmental Management, focuses equally on reducing risks to workers, the public, and the environment and on protecting the Columbia River. The DOE, which operates the Hanford Site, the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology) signed a comprehensive cleanup and compliance agreement on May 15, 1989. The Hanford Federal Facility Agreement and Consent Order, or Tri-Party Agreement (TPA), is an agreement for achieving compliance with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) remedial action provisions and with the Resource Conservation and Recovery Act (RCRA) treatment, storage, and disposal (TSD) unit regulations and corrective action provisions . More specifically, the Tri-Party Agreement does the following: 1) defines and ranks CERCLA and RCRA cleanup commitments; 2) establishes

  16. Annual report on the U.S. Department of Energy's Cultural Resource Activities at Colorado UMTRA Project Sites for October 1993 through September 1994

    International Nuclear Information System (INIS)

    1994-11-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1993, through September 30, 1994. The UMTRA Project is a cooperative (state and federal) program mandated by the Uranium Mill Tailings Radiation Control Act, Public Law 95-604 (42 USC section 7901 et seq.). This law requires the timely cleanup of 24 inactive uranium mill tailings sites throughout the United States. Nine of these inactive uranium mill tailings sites are in Colorado at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, Advisory Council on Historic Preservation, and Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of agreement (PMOA) (DOE, 1984). This PMOA specifies requirements for the DOE's fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report fulfills the requirement for the DOE to provide the state of Colorado with an annual report on the cultural resource activities performed for all of the UMTRA Project sites in Colorado. This report is organized by UMTRA Project site. For each site, the general remedial action activities and cultural resource activities performed during the period of record are summarized. When known, the DOE's plans for future cultural resource activities at the site are summarized

  17. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    Energy Technology Data Exchange (ETDEWEB)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  18. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    International Nuclear Information System (INIS)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal

  19. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  20. Completion report for the UMTRA project Vitro processing site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-08-01

    This completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approval design and that all U.S. Environmental Protection Agency (EPA) standards have been satisfied. Included as appendixes to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawing and the EPA standards; the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objectives of remedial action at Salt Lake City were to remove the tailings from the former processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. The final remedial action plan, which is approved by the U.S. Department of Energy and concurred upon by the U.S. Nuclear Regulator Commission and the state of Utah, contains the conceptual design used to develop the final approved design. During remedial action construction operations, conditions were encountered that required design features that differed form the conceptual design. These conditions and the associated design changes are noted in the record drawings. All remedial action activities were completed in conformance with the specifications and drawings. In the opinion of the state of Utah, the record drawings accurately reflect existing property conditions at the processing site

  1. Land-use changes on the proposed Clinch River Breeder Reactor demonstration. Project site: 1924 to 1972

    International Nuclear Information System (INIS)

    McConathy, R.K.

    1976-02-01

    A report is presented which documents the use history of the CRBRDP site and is also the first in a series to describe ecological areas on the ERDA Oak Ridge Reservation meeting criteria for scientific study sites or natural areas worthy of preservation. The CRBRDP area under discussion is located in Roane County, Tennessee and is a part of the land purchased in 1942 by the United States Government for the Manhattan Project, now known as the ERDA Oak Ridge Reservation

  2. Evaluation of the radionuclide tracer test conducted at the project Gnome Underground Nuclear Test Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, G.; Pohlmann, K.

    1996-08-01

    A radionuclide tracer test was conducted in 1963 by the U.S. Geological Survey at the Project Gnome underground nuclear test site, approximately 40 km southeast of Carlsbad, New Mexico. The tracer study was carried out under the auspices of the U.S. Atomic Energy Commission (AEC) to study the transport behavior of radionuclides in fractured rock aquifers. The Culebra Dolomite was chosen for the test because it was considered to be a reasonable analogue of the fractured carbonate aquifer at the Nevada Test Site (NTS), the principal location of U.S. underground nuclear tests. Project Gnome was one of a small number of underground nuclear tests conducted by the AEC at sites distant from the NTS. The Gnome device was detonated on December 10, 1961 in an evaporate unit at a depth of 360 m below ground surface. Recently, the U.S. Department of Energy (DOE) implemented an environmental restoration program to characterize, remediate, and close these offsite nuclear test areas. An early step in this process is performance of a preliminary risk analysis of the hazard posed by each site. The Desert Research Institute has performed preliminary hydrologic risk evaluations for the groundwater transport pathway at Gnome. That evaluation included the radioactive tracer test as a possible source because the test introduced radionuclides directly into the Culebra Dolomite, which is the only aquifer at the site. This report presents a preliminary evaluation of the radionuclide tracer test as a source for radionuclide migration in the Culebra Dolomite. The results of this study will assist in planning site characterization activities and refining estimates of the radionuclide source for comprehensive models of groundwater transport st the Gnome site

  3. Calculational techniques for estimating population doses from radioactivity in natural gas from nuclearly stimulated wells

    International Nuclear Information System (INIS)

    Barton, C.J.; Moore, R.E.; Rohwer, P.S.; Kaye, S.V.

    1975-01-01

    Techniques for estimating radiation doses from exposure to combustion products of natural gas obtained from wells created by use of nuclear explosives were first developed in the Gasbuggy Project. These techniques were refined and extended by development of a number of computer codes in studies related to the Rulison Project, the second in the series of joint government-industry efforts to demonstrate the feasibility of increasing natural gas production from low-permeability rock formations by use of nuclear explosives. These techniques are described and dose estimates that illustrate their use are given. These dose estimation studies have been primarily theoretical, but we have tried to make our hypothetical exposure conditions correspond as closely as possible with conditions that could exist if nuclearly stimulated natural gas is used commercially. (author)

  4. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    International Nuclear Information System (INIS)

    Survochak, Scott; Daniel, Joe

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)-trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  5. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Energy Technology Data Exchange (ETDEWEB)

    Survochak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarrao Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  6. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  7. Bure's underground research laboratory: general framework, objectives, siting process and schedule of the URL project

    International Nuclear Information System (INIS)

    Gaussen, J.L.

    2001-01-01

    Bure URL project is one of the components of the French research program dedicated to the study of HLLLW (High Level Long Lived Radioactive Waste) disposal in geologic repository within the framework of the 1991 Radioactive Waste Act. Pursuant to the said act, the objective of the URL project is to participate in the ''evaluation of options for retrievable or non- retrievable disposal in deep geologic formations''. More precisely, the goal of this URL, which is situated 300 km East of Paris, is to gain a better knowledge of a site capable of hosting a geologic repository. (author)

  8. Hominin Sites and Paleolakes Drilling Project: A 500,000-year climate record from Chew Bahir, a key site in southern Ethiopia

    Science.gov (United States)

    Foerster, Verena E.; Asrat, Asfawossen; Chapot, Melissa S.; Cohen, Andrew S.; Dean, Jonathan R.; Deino, Alan; Günter, Christina; Junginger, Annett; Lamb, Henry F.; Leng, Melanie J.; Roberts, Helen M.; Schaebitz, Frank; Trauth, Martin H.

    2017-04-01

    What is the environmental context of human evolution and dispersal? In order to evaluate the impact that different timescales and magnitude of climatic shifts have had on the living conditions of anatomically modern humans, the Hominin Sites and Paleolakes Drilling Project (HSPDP) has cored five predominantly-lacustrine sequences to investigate climate change in East Africa (Cohen et al., 2016). The five high-priority areas in Ethiopia and Kenya are located in close proximity to key paleoanthropological sites covering various steps in evolution. One of the five cores is from Chew Bahir. Chew Bahir is a deep tectonically-bound basin in the southern Ethiopian rift, close to the Lower Omo valley, site of the earliest known fossil of anatomically modern humans. As part of the deep drilling initiative between ICDP-HSPDP and the Collaborative Research Center (CRC806), the Chew Bahir sedimentary deposits were cored in late 2014, yielding in two parallel cores reaching 280 m depth and which cover the last 550 ka of environmental history. We present the initial results of on-going lithologic and stratigraphic investigation of the composite core, the results of high resolution MSCL and XRF scanning data, as well as the first results of detailed multi-proxy analysis of the Chew Bahir cores. These analyses are based on more than 14,000 discrete subsamples. An initial chronology, based on Ar/Ar and OSL dating, allows the first reconstructions of dry-wet cycles during the last 550 ka. Both geochemical and sedimentological results show that the Chew Bahir deposits are sensitive recorders of changes in moisture, sediment influx, provenance, transport and diagenetic processes. The core records will allow tests of the various hypotheses regarding the impact of climate variability -from climate flickers to orbital driven transitions- on the evolution and dispersal of anatomically modern humans. References: Cohen, A. et al., 2016. The Hominin Sites and Paleolakes Drilling Project

  9. Comment and response document for the UMTRA Project vitro processing site completion report Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This Comment and Response Document is a series of UMTRA document review forms regarding the UMTRA Project Vitro Processing Site Completion Report for Salt Lake City, Utah in March, 1995. The completion report provides evidence that the final Salt Lake City, Utah, processing site property conditions are in accordance with the approved design and that all U.S. Environmental Protection Agency (EPA) standards have been satisfied. Included as appendices to support the stated conclusions are the record drawings; a summary of grid test results; contract specifications and construction drawings, the EPA standards (40 CFR Part 192); the audit, inspection, and surveillance summary; the permit information; and project photographs. The principal objective of the remedial action at Salt Lake City is to remove the tailings from the processing site, render the site free of contamination to EPA standards, and restore the site to the final design grade elevations. Each section is evaluated in detail to check all aspects of above report, especially the inclusion of adequate verification data. Each review form contains a section entitled State of Utah Response and Action, which is an explanation or correction of DOE criticisms of the report

  10. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    International Nuclear Information System (INIS)

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  11. 77 FR 12002 - Mount Baker-Snoqualmie National Forest Site-Specific Invasive Plant Treatment Project and Forest...

    Science.gov (United States)

    2012-02-28

    ... Invasive Plant Treatment Project and Forest Plan Amendment Number 28 AGENCY: Forest Service, USDA. ACTION... Forest. The current Forest-wide treatment approach pre-dates the Pacific Northwest Region Invasive Plant... interdisciplinary analysis: (1) Whether or not to authorize site- specific invasive plant treatments using...

  12. Give Water a Hand. School Site Action Guide. Organizing Water Conservation and Pollution Prevention Service Projects in Your Community.

    Science.gov (United States)

    Wisconsin Univ., Madison. Coll. of Agricultural and Life Sciences.

    Students grades 4-8 can use this guide to explore the topics of water, and water conservation at a school site, while conducting an environmental community service project. Youth groups, led by a group leader, work with local experts from business, government, or environmental organizations to complete the project. Nine activity sections involve…

  13. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  14. Rhode Island crystalline repository siting project: Technical progress report, Calendar year 1986

    International Nuclear Information System (INIS)

    Vild, B.

    1987-01-01

    A Nuclear Waste Fund established by the Nuclear Waste Policy Act of 1982 provides financial support to affected states to participate in the high-level radioactive waste repository siting program of the US Department of Energy. In Rhode Island, that function was performed by a multidisciplinary Project Review Team consisting of staff from three State agencies. Members of the Review Team attended several meetings in 1986 to discuss mutual concerns with Federal, State and Tribal officials. Comments were developed on DOE's Draft Area Recommendation Report. Members of the Review Team also testified at a public hearing in Providence on the Draft ARR, and developed and distributed a public information booklet. In May, Secretary of Energy John Herrington announced the suspension of the crystalline repository siting program. The remainder of the year was spent monitoring litigation challenging that decision and pending legislation. Administrative phase-down of the program was essentially complete by the close of the calendar year

  15. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  16. The Italian forest sites of FunDivEUROPE: a new FP7 project on the functional significance of forest biodiversity in Europe

    Directory of Open Access Journals (Sweden)

    Bussotti F

    2012-12-01

    Full Text Available The Italian forest sites of FunDivEUROPE: a new FP7 project on the functional significance of forest biodiversity in Europe. FunDivEUROPE is a new project aiming at a deeper understanding of the role of forest diversity on ecosystem functions and service provisioning for society. This project combines three scientific platforms: experimental, exploratory and inventory. The exploratory platform is based on the observation of a broad range of properties, traits and ecological processes on a network of ca. 240 natural forest sites representing a gradient of tree species diversity in six focal regions of Europe (Spain, Italy, Germany, Poland, Finland and Romania. The Italian sites are located on the hills of central and Southern Tuscany and represent the category “thermophilous deciduous forest”. Almost one year of fieldwork was needed to select and characterize 36 plots measuring 30 x 30 m. Selection was based on criteria concerning tree mixtures and richness, structural parameters and main environmental variables. The main features of these sites are synthetically presented in this paper together with a short description of the project structure and scope. The aim is also to enhance dissemination of the potential implications for a sustainable forest management in Italy.

  17. Fernald Environmental Management Project 1995 site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  18. The Australian national reactive phosphate rock project - Aims, experimental approach, and site characteristics

    International Nuclear Information System (INIS)

    McLaughlin, M.J.

    2002-01-01

    Field-based cutting trials were established across Australia in a range of environments to evaluate the agronomic effectiveness of 5 phosphate rocks, and 1 partially acidulated phosphate rock, relative to either single super-phosphate or triple superphosphate. The phosphate rocks differed in reactivity, as determined by the degree of carbonate substitution for phosphate in the apatite structure and solubility of phosphorus present in the fertilizers in 2% formic acid, 2% citric acid and neutral ammonium citrate. Sechura (Bayovar) and North Carolina phosphate rocks were highly reactive (>70% solubility in 2% formic acid), whilst Khouribja (Moroccan) and Hamrawein (Egypt) phosphate rock were moderately reactive. Duchess phosphate rock from Queensland was relatively unreactive ( 2 , from 4.0 to 5.1, and Colwell extractable phosphorus ranged from 3 to 47 μg/g prior to fertilizer application. Two core experiments were established at each site. The first measured the effects of phosphate rock reactivity on agronomic effectiveness, while the second core experiment measured the effects of the degree of water solubility of the phosphorus source on agronomic effectiveness. The National Reactive Phosphate Rock Project trials provided the opportunity to confirm the suitability of accepted procedures to model fertilizer response and to develop new approaches for comparing different fertilizer responses. The Project also provided the framework for subsidiary studies such as the effect of fertilizer source on soil phosphorus extractability; cadmium and fluorine concentrations in herbage; evaluation of soil phosphorus tests; and the influence of particle size on phosphate rock effectiveness. The National Reactive Phosphate Rock Project presents a valuable model for a large, Australia-wide, collaborative team approach to an important agricultural issue. The use of standard and consistent experimental methodologies at every site ensured that maximum benefit was obtained from data

  19. Summary of operations and performance of the Murdock site restoration project in 2008.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  20. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. Management and Beneficial Reuse of Overburden Material - Linde Formerly Utilized Sites Remedial Action Program (FUSRAP) Remediation Project

    International Nuclear Information System (INIS)

    Boyle, J.D.; Schwippert, M.; Lorenz, W.D.

    2009-01-01

    This paper outlines three separate and distinct situations where the proper management of overburden material allows for the beneficial reuse of overburden material. Beneficial reuse of overburden material at the Linde Project was made possible by a simultaneous combination of physical conditions at the site in conjunction with collaborative planning and cooperation between U.S. Army Corps of Engineers - Buffalo District, New York State Department of Energy and Conservation, the Owner and Shaw Environmental and Infrastructure. Efforts by the project team focused on maintaining compliance with project plan requirements, communicating the plan to all parties, executing the plan safely and efficiently, and emphasizing fiscal responsibility to ensure maximum cost savings. (authors)

  6. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  8. Project VISION (Very Intensive Scientific Intercurricular On-Site Education

    Science.gov (United States)

    Roig, Gustavo A.

    1999-01-01

    Project VISION (Very Intensive Scientific Intercurricular On-Site Education) is a joint effort among NASA/John F. Kennedy Space Center, Florida International University, Universidad del Turabo, Miami-Dade County Public Schools and the Caguas/Gurabo Public Schools in Puerto Rico. The project's main mission is to institutionalize change among the elementary and middle school science and math teachers at participating schools so that their students receive continuously enriched instruction in the principles of science and math through the use of hands-on and minds-on experiments called learning modules. These leaming modules incorporate the national science and math education standards provided by the National Committee on Science Education Standards and Assessments and the National Council of Teachers of Mathematics, respectively. The use of learning modules that require hands-on and minds-on activities in a classroom setting garners great enthusiasm and motivation on the part of the target students for the understanding of the lesson's underlying math and science principles. With this enthusiasm and motivation, comes acceptance, attention, participation, discipline, acquiescence, and collaboration. Additionally, the use of hands-on activities may also require learning through a gamut of senses. Not only can the student use his/her eyes and ears during these activities, but most times, they can also use their senses of touch, smell, and taste, as well as intuition. Learning is, therefore, achieved using most or all the human senses. The combination of motivation/enthusiasm and the use of multiple senses creates an ideal environment conducive to leaming at a profound level.

  9. Yucca Mountain Site Characterization Project: Technical Data Catalog (quarterly supplement), June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The DOE/NRC Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the date, place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  10. THE GEOMATICS CONTRIBUTION FOR THE VALORISATION PROJECT IN THE ROCCA OF SAN SILVESTRO LANDSCAPE SITE

    Directory of Open Access Journals (Sweden)

    D. Brocchini

    2017-05-01

    Full Text Available This paper proposes an emblematic project where several multi-sensor strategies for spatial data acquisition and management, range based and image based, were combined to create a series of integrated territorial and architectural scale products characterized by a rich multi-content nature. The work presented here was finalized in a test site that is composed by an ensemble of diversified cultural deposits; the objects that were surveyed and modelled range from the landscape with its widespread mining sites, the main tower with its defensive role, the urban configuration of the settlement, the building systems and techniques, a medieval mine. For this reason, the Rocca of San Silvestro represented a perfect test case, due to its complex and multi-stratified character. This archaeological site is a medieval fortified village near the municipality of Campiglia Marittima (LI, Italy. The Rocca is part of an Archaeological Mines Park and is included in the Parchi della Val di Cornia (a system of archaeological parks, natural parks and museums in the south-west of Tuscany. The fundamental role of a deep knowledge about a cultural artefact before the planning of a restoration and valorisation project is globally recognized; the qualitative and quantitative knowledge provided by geomatics techniques is part of this process. The paper will present the different techniques that were used, the products that were obtained and will focus on some mapping and WEB GIS applications and analyses that were performed and considerations that were made.

  11. The Geomatics Contribution for the Valorisation Project in the Rocca of San Silvestro Landscape Site

    Science.gov (United States)

    Brocchini, D.; Chiabrando, F.; Colucci, E.; Sammartano, G.; Spanò, A.; Teppati Losè, L.; Villa, A.

    2017-05-01

    This paper proposes an emblematic project where several multi-sensor strategies for spatial data acquisition and management, range based and image based, were combined to create a series of integrated territorial and architectural scale products characterized by a rich multi-content nature. The work presented here was finalized in a test site that is composed by an ensemble of diversified cultural deposits; the objects that were surveyed and modelled range from the landscape with its widespread mining sites, the main tower with its defensive role, the urban configuration of the settlement, the building systems and techniques, a medieval mine. For this reason, the Rocca of San Silvestro represented a perfect test case, due to its complex and multi-stratified character. This archaeological site is a medieval fortified village near the municipality of Campiglia Marittima (LI), Italy. The Rocca is part of an Archaeological Mines Park and is included in the Parchi della Val di Cornia (a system of archaeological parks, natural parks and museums in the south-west of Tuscany). The fundamental role of a deep knowledge about a cultural artefact before the planning of a restoration and valorisation project is globally recognized; the qualitative and quantitative knowledge provided by geomatics techniques is part of this process. The paper will present the different techniques that were used, the products that were obtained and will focus on some mapping and WEB GIS applications and analyses that were performed and considerations that were made.

  12. Status of initial phase of site-specific seismic monitoring: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Rohay, A.C.

    1981-01-01

    This report presents the status of the initial phase of site-specific seismic monitoring work conducted under the Basalt Waste Isolation Project. This work is currently organized under two main elements: (1) a portable array; and (2) a baseline data collection array. Progress toward the development of each array is discussed along with an interpretation of preliminary data obtained from the test of a borehole seismometer at potential repository depths. The text is supplemented by nine figures and one table. 9 figs., 1 tab

  13. Rebaselining of the plutonium residue elimination project at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Sailor, W.C.; Catlett, D.S.; Burns, T.P.

    1997-01-01

    Systems Engineering and Value Engineering principles were put into practice in rebaselining the Pu Residue Stabilization and Elimination Project at the Rocky Flats Environmental Technology Site. Tradeoff studies were conducted as to how to best rebaseline the system under the new Safeguards Termination Limits (STSs) issued by the Department of Energy. Through the use of a computerized database, the means by which Stakeholder values and other high-level requirements have been included in the tradeoff studies were documented. 13 refs., 2 figs., 1 tab

  14. Rebaselining of the plutonium residue elimination project at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    Sailor, W.C.; Catlett, D.S.; Burns, T.P. [and others

    1997-03-01

    Systems Engineering and Value Engineering principles were put into practice in rebaselining the Pu Residue Stabilization and Elimination Project at the Rocky Flats Environmental Technology Site. Tradeoff studies were conducted as to how to best rebaseline the system under the new Safeguards Termination Limits (STSs) issued by the Department of Energy. Through the use of a computerized database, the means by which Stakeholder values and other high-level requirements have been included in the tradeoff studies were documented. 13 refs., 2 figs., 1 tab.

  15. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site's contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b)

  16. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  17. Monitoring ground deformation of cultural heritage sites using UAVs and geodetic techniques: the case study of Choirokoitia, JPI PROTHEGO project

    Science.gov (United States)

    Themistocleous, Kyriacos; Danezis, Chris; Mendonidis, Evangelos; Lymperopoulou, Efstathia

    2017-10-01

    This paper presents the integrated methods using UAVs and geodetic techniques to monitor ground deformation within the Choirokoitia UNESCO World Heritage Site in Cyprus. The Neolithic settlement of Choirokoitia, occupied from the 7th to the 4th millennium B.C., is one of the most important prehistoric sites in the eastern Mediterranean. The study is conducted under the PROTHEGO (PROTection of European Cultural HEritage from GeO-hazards) project, which is a collaborative research project funded in the framework of the Joint Programming Initiative on Cultural Heritage and Global Change (JPICH) - Heritage Plus in 2015-2018 (www.prothego.eu) and through the Cyprus Research Promotion Foundation. PROTHEGO aims to make an innovative contribution towards the analysis of geo-hazards in areas of cultural heritage, and uses novel space technology based on radar interferometry to retrieve information on ground stability and motion in the 400+ UNESCO's World Heritage List monuments and sites of Europe. The field measurements collected at the Choirokoitia site will be later compared with SAR data to verify micro-movements in the area to monitor potential geo-hazards. The site is located on a steep hill, which makes it vulnerable to rock falls and landslides.

  18. Fernald Environmental Management Project 1995 site environmental report

    International Nuclear Information System (INIS)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA

  19. Work plan for monitor well installation water and sediment sample collection aquifer testing and topographic surveying at the Riverton, Wyoming, UMTRA Project Site

    International Nuclear Information System (INIS)

    1995-06-01

    Investigations conducted during preparation of the site observational work plan (SOWP) at the Uranium Mill Tailings Remedial Action (UMTRA) Project site support a proposed natural flushing ground water compliance strategy, with institutional controls. However, additional site-specific data are needed to reduce uncertainties in order to confirm the applicability and feasibility of this proposed compliance strategy option. This proposed strategy will be analyzed in the site-specific environmental assessment. The purpose of this work plan is to summarize the data collection objectives to fill those data needs, describe the data collection activities that will be undertaken to meet those objectives, and elaborate on the data quality objectives which define the procedures that will be followed to ensure that the quality of these data meet UMTRA Project needs

  20. Implementing ‘Site BIM’

    DEFF Research Database (Denmark)

    Davies, Richard; Harty, Chris

    2013-01-01

    Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation...... of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM...

  1. The CHT2 Project: Diachronic 3d Reconstruction of Historic Sites

    Science.gov (United States)

    Guidi, G.; Micoli, L.; Gonizzi Barsanti, S.; Malik, U.

    2017-08-01

    Digital modelling archaeological and architectural monuments in their current state and in their presumed past aspect has been recognized not only as a way for explaining to the public the genesis of a historical site, but also as an effective tool for research. The search for historical sources, their proper analysis and interdisciplinary relationship between technological disciplines and the humanities are fundamental for obtaining reliable hypothetical reconstructions. This paper presents an experimental activity defined by the project Cultural Heritage Through Time - CHT2 (http://cht2-project.eu), funded in the framework of the Joint Programming Initiative on Cultural Heritage (JPI-CH) of the European Commission. Its goal is to develop time-varying 3D products, from landscape to architectural scale, deals with the implementation of the methodology on one of the case studies: the late Roman circus of Milan, built in the era when the city was the capital of the Western Roman Empire (286-402 A.D). The work presented here covers one of the cases in which the physical evidences have now been almost entirely disappeared. The diachronic reconstruction is based on a proper mix of quantitative data originated by 3D surveys at present time, and historical sources like ancient maps, drawings, archaeological reports, archaeological restrictions decrees and old photographs. Such heterogeneous sources have been first georeferenced and then properly integrated according to the methodology defined in the framework of the CHT2 project, to hypothesize a reliable reconstruction of the area in different historical periods.

  2. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  3. Prognostic simulation of reinjection-research project geothermal site Neustadt-Glewe/Germany

    Energy Technology Data Exchange (ETDEWEB)

    Poppei, J. [Geothermie Neubrandenburg GmbH (Germany)

    1995-03-01

    For the first time after political and economical changes in Germany a hydrothermal site was put into operation in December 1994. Due to prevailing conditions extraordinary in Central Europe (reservoir temperature 99{degrees}C; 220 g/l salinity) the project Neustadt-Glewe is supported by a comprehensive research program. The wells concerned (a doublet with an internal distance of 1.400 m) open the porous sandstone aquifer with an average thickness of about 53 m in a depth of 2.240m. One point of interest was the pressure and temperature behavior over a period of 10 years considering the fluid viscosity changes due to variable injection temperature. For means of reservoir simulation and prognosing the injection behavior and simulator code TOUGH2 was used.

  4. Fire hazards analysis for the replacement cross-site transfer system, project W-058

    International Nuclear Information System (INIS)

    Sepahpur, J.B.

    1996-01-01

    The fire hazards analysis assess the risk from fire and determines compliance with the applicable criteria of DOE 5480.7A, DOE 6430.1A, and RLID 5480.7. (Project W-058 will provide encased pipelines to connect the SY Tank Farms in 200 West Area with the tank farms in 200 East Area via an interface with the 244-A lift station. Function of the cross-site transfer system will be to transfer radioactive waste from the SY Tank Farm to treatment, storage, and disposal facilities in 200 East Area.)

  5. Computer analysis of protein functional sites projection on exon structure of genes in Metazoa.

    Science.gov (United States)

    Medvedeva, Irina V; Demenkov, Pavel S; Ivanisenko, Vladimir A

    2015-01-01

    Study of the relationship between the structural and functional organization of proteins and their coding genes is necessary for an understanding of the evolution of molecular systems and can provide new knowledge for many applications for designing proteins with improved medical and biological properties. It is well known that the functional properties of proteins are determined by their functional sites. Functional sites are usually represented by a small number of amino acid residues that are distantly located from each other in the amino acid sequence. They are highly conserved within their functional group and vary significantly in structure between such groups. According to this facts analysis of the general properties of the structural organization of the functional sites at the protein level and, at the level of exon-intron structure of the coding gene is still an actual problem. One approach to this analysis is the projection of amino acid residue positions of the functional sites along with the exon boundaries to the gene structure. In this paper, we examined the discontinuity of the functional sites in the exon-intron structure of genes and the distribution of lengths and phases of the functional site encoding exons in vertebrate genes. We have shown that the DNA fragments coding the functional sites were in the same exons, or in close exons. The observed tendency to cluster the exons that code functional sites which could be considered as the unit of protein evolution. We studied the characteristics of the structure of the exon boundaries that code, and do not code, functional sites in 11 Metazoa species. This is accompanied by a reduced frequency of intercodon gaps (phase 0) in exons encoding the amino acid residue functional site, which may be evidence of the existence of evolutionary limitations to the exon shuffling. These results characterize the features of the coding exon-intron structure that affect the functionality of the encoded protein and

  6. Salt Repository Project site study plan for background environmental radioactivity: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Background Environmental Radioactivity describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study the need for the study, the study design, data management, and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 43 refs., 10 figs., 7 tabs

  7. Procedural justice in wind facility siting: Recommendations for state-led siting processes

    International Nuclear Information System (INIS)

    Ottinger, Gwen; Hargrave, Timothy J.; Hopson, Eric

    2014-01-01

    Evidence suggests that state control of wind facility siting decisions fosters new project development more effectively than local control, yet the literature suggests that affected citizens tend to be more fairly represented in local siting processes. We argue that successful renewable energy policy must satisfy both the need for new project development and the obligation to procedural justice. To suggest how it can do so, we analyze existing state- and county-level siting processes in Washington state, finding that both fall short on measures of procedural justice. To overcome this limitation and address the tension between procedural justice and project development, we then propose a collaborative governance approach to wind facility siting, in which state governments retain ultimate authority over permitting decisions but encourage and support local-level deliberations as the primary means of making those decisions. Such an approach, we argue, would be more just, facilitate wind development by addressing community concerns constructively and result in better projects through the input of diverse stakeholders. - Highlights: • States have made wind energy development a priority. • Local opposition to new projects could hinder future wind energy development. • Procedural justice is necessary to resolve local issues and ensure timely wind facility siting. • Both state- and county-led siting processes fall short with respect to criteria for procedural justice, though local processes have some advantages. • States could instead induce counties, developers to engage in deliberation

  8. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  9. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs

  10. A future for nuclear sites beyond their service life. Nuclear site value development; Un avenir pour les sites nucleaires en fin de cycle. Valorisation des sites nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    As the nuclear industry moves into a new development phase, many facilities built in the fifties and sixties are reaching the end of their service life. Dismantling them and rehabilitating the sites on which they stand is a major industrial challenge which will give rise to a number of new projects. AREVA has more than 20 years' experience in these highly technical fields. As more and more sites reach the end of their service life, AREVA considers nuclear site value development as a fully-fledged industrial activity. The group's competencies in this field have been grouped together to form a dedicated entity: the Nuclear Site Value Development Business Unit, created in 2008. Several billion euros are invested in site value development projects which are far-reaching and complex, and often last for several decades. Long before work actually begins, lengthy studies and preparations are required to schedule operations, select the techniques to be used and optimize costs and deadlines. The Nuclear Site Value Development BU is currently working on four major projects involving its own facilities and those of the CEA: - La Hague: dismantling of the first generation of used fuel recycling facilities. Between 1966 and 1998, almost 5,000 tons of used fuel from graphite-moderated gas-cooled reactors, 4,500 tons of light water reactor fuel, as well as fuel from fast reactors and research reactors, were treated at UP2 400, the very first industrial recycling plant on the La Hague site. - Marcoule: first-time dismantling of a recycling plant. 1,000 rooms to be cleaned up, 30,000 tons of waste to be treated, 30 years of work. - Cadarache: first-time dismantling of a Mox fuel fabrication plant. The Cadarache plant was commissioned in 1962 to fabricate fuel for fast reactors; this was followed by MOX fuel for light water reactors, an activity which continued until the plant was shut down in 2003. - Annecy and Veurey: giving a new lease of life to former industrial sites

  11. mHealth Series: mHealth project in Zhao County, rural China – Description of objectives, field site and methods

    Directory of Open Access Journals (Sweden)

    Michelle Helena van Velthoven

    2013-12-01

    Full Text Available We set up a collaboration between researchers in China and the UK that aimed to explore the use of mHealth in China. This is the first paper in a series of papers on a large mHealth project part of this collaboration. This paper included the aims and objectives of the mHealth project, our field site, and the detailed methods of two studies.

  12. Summary of operations and performance of the Murdock site restoration project in 2007.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  13. mHealth Series: mHealth project in Zhao County, rural China – Description of objectives, field site and methods

    Science.gov (United States)

    van Velthoven, Michelle Helena; Li, Ye; Wang, Wei; Du, Xiaozhen; Wu, Qiong; Chen, Li; Majeed, Azeem; Rudan, Igor; Zhang, Yanfeng; Car, Josip

    2013-01-01

    Background We set up a collaboration between researchers in China and the UK that aimed to explore the use of mHealth in China. This is the first paper in a series of papers on a large mHealth project part of this collaboration. This paper included the aims and objectives of the mHealth project, our field site, and the detailed methods of two studies. Field site The field site for this mHealth project was Zhao County, which lies 280 km south of Beijing in Hebei Province, China. Methods We described the methodology of two studies: (i) a mixed methods study exploring factors influencing sample size calculations for mHealth–based health surveys and (ii) a cross–over study determining validity of an mHealth text messaging data collection tool. The first study used mixed methods, both quantitative and qualitative, including: (i) two surveys with caregivers of young children, (ii) interviews with caregivers, village doctors and participants of the cross–over study, and (iii) researchers’ views. We combined data from caregivers, village doctors and researchers to provide an in–depth understanding of factors influencing sample size calculations for mHealth–based health surveys. The second study, a cross–over study, used a randomised cross–over study design to compare the traditional face–to–face survey method to the new text messaging survey method. We assessed data equivalence (intrarater agreement), the amount of information in responses, reasons for giving different responses, the response rate, characteristics of non–responders, and the error rate. Conclusions This paper described the objectives, field site and methods of a large mHealth project part of a collaboration between researchers in China and the UK. The mixed methods study evaluating factors that influence sample size calculations could help future studies with estimating reliable sample sizes. The cross–over study comparing face–to–face and text message survey data collection

  14. The public visits a nuclear waste site: Survey results from the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Hoffman, W.D.

    1987-01-01

    This paper discusses the results of the 1986 survey taken at the West Valley Demonstration Project Open House where a major nuclear waste cleanup is in progress. Over 1400 people were polled on what they think is most effective in educating the public on nuclear waste. A demographic analysis describes the population attending the event and their major interests in the project. Responses to attitudinal questions are examined to evaluate the importance of radioactive waste cleanup as an environmental issue and a fiscal responsibility. Additionally, nuclear power is evaluated on its public perception as an energy resource. The purpose of the study is to find out who visits a nuclear waste site and why, and to measure their attitudes on nuclear issues

  15. The strontium isotopic composition of interstitial waters from sites 245 and 336 of the deep sea drilling project

    International Nuclear Information System (INIS)

    Hawkesworth, C.J.; Elderfield, H.

    1978-01-01

    Measurements of 87 Sr/ 86 Sr ratios of interstitial waters from leg 25, site 245 and leg 38, site 336 of the Deep Sea Drilling Project show that the enrichment of Sr 2+ with depth is caused both by the alteration of volcanic material and by the introduction of strontium derived from calcium carbonate. 87 Sr/ 86 Sr ratios range from 0.70913 to 0.70794 at site 245 and from 0.70916 to 0.70694 at site 336. The low ratios compared with contemporaneous seawater reflect the release of Sr from a volcanic source having, according to material-balance calculations, a 87 Se/ 86 Sr ratio of about 0.7034 at site 336. At this site the source appears to be volcanic ash and not basaltic basement which acts as a sink for Sr 2+ during in situ low-temperature weathering. The volcanic contribution to the strontium enrichment in the basal interstitial waters varies from 50% at site 336. The remaining Sr 2+ is derived from Sr-rich biogenic carbonate during diagenetic recrystallization to form Sr-poor calcite. (Auth.)

  16. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  17. Use of project management approach for planning of decommissioning activities of a uranium mining site

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Saulo F.Q.; Lage, Ricardo F.; Gomes, Danielle E.; Ogawa, Iukio, E-mail: quintao.saulo@gmail.com, E-mail: rflage@gmail.com, E-mail: danielle@inb.gov.br, E-mail: iukio@inb.gov.br [Indústrias Nucleares do Brasil (INB), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    The decommissioning of nuclear facilities in the fuel cycle is an extremely important factor for the continuity of nuclear program in any country, especially in that countries such as Brazil, where there are some facilities are in process of being dismantled or must be decommissioned in the medium and long term. Since the decommissioning is a process quite complex and expensive and for this reason, it must be handle with modern management practices for so that the chances of success are increased. This work aims to describe the management plan and the strategy adopted for the execution of the decommissioning and environmental remediation (D and ER) activities for the first uranium mine in Brazil, located in the Minas Gerais State and known as Unidade de Tratamento de Minério (UTM). This facility was operated between 1982 and 1995. All the economically recoverable uranium was extracted and nowadays there is no mining activity is underway and there are only research and laboratory activities are running in the site. The conceptual plans for decommissioning and remediation for this unit have been prepared and emergency activities were recommended. These activities are related to studies about drainage acid, ensure safety of dams, adequacy of CAKE II storage conditions and request for operating licenses for the decommissioning from IBAMA and the authorization from CNEN. The majority of the critical factors for decommissioning had their origin due the characteristics of the project have been implemented and has remained due to uncertainties in the decision-making process over time. This project has a set of variables that need to be analyzed considering different aspects as licensing and regulatory framework, radiological, technical and engineering issues, beyond costs, schedule, risks and human resources. In this sense, it was decided to adopt the good practices of project management, published by the Project Management Institute - PMI and to give a differentiated

  18. Use of project management approach for planning of decommissioning activities of a uranium mining site

    International Nuclear Information System (INIS)

    Ribeiro, Saulo F.Q.; Lage, Ricardo F.; Gomes, Danielle E.; Ogawa, Iukio

    2017-01-01

    The decommissioning of nuclear facilities in the fuel cycle is an extremely important factor for the continuity of nuclear program in any country, especially in that countries such as Brazil, where there are some facilities are in process of being dismantled or must be decommissioned in the medium and long term. Since the decommissioning is a process quite complex and expensive and for this reason, it must be handle with modern management practices for so that the chances of success are increased. This work aims to describe the management plan and the strategy adopted for the execution of the decommissioning and environmental remediation (D and ER) activities for the first uranium mine in Brazil, located in the Minas Gerais State and known as Unidade de Tratamento de Minério (UTM). This facility was operated between 1982 and 1995. All the economically recoverable uranium was extracted and nowadays there is no mining activity is underway and there are only research and laboratory activities are running in the site. The conceptual plans for decommissioning and remediation for this unit have been prepared and emergency activities were recommended. These activities are related to studies about drainage acid, ensure safety of dams, adequacy of CAKE II storage conditions and request for operating licenses for the decommissioning from IBAMA and the authorization from CNEN. The majority of the critical factors for decommissioning had their origin due the characteristics of the project have been implemented and has remained due to uncertainties in the decision-making process over time. This project has a set of variables that need to be analyzed considering different aspects as licensing and regulatory framework, radiological, technical and engineering issues, beyond costs, schedule, risks and human resources. In this sense, it was decided to adopt the good practices of project management, published by the Project Management Institute - PMI and to give a differentiated

  19. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  20. Salt Repository Project site study plan for stratigraphic boreholes: Revision 1, December 18, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This site study describes the Stratigraphic Boreholes field work to be conducted during the early stages of Site Characterization at the Deaf Smith County, Texas site. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/local regulations, and repository program requirements. Four Stratigraphic Holes will be drilled near the perimeter of the site to document the subsurface geologic conditions in that area and to provide data necessary for design and construction of the Exploratory Shaft Facilities. Continuous samples will be recovered from the ground surface to the total depth of each sell. Geophysical well logs will provide additional coverage of the stratigraphic section. In-situ down hole testing will include short term hydrologic tests and hydraulic fracture tests to provide information on deep groundwater characteristics and regional stress patterns, respectively. Field methods/tests are chosen that provide the best or only means of obtaining the required data. The Salt Repository Project (SRP) Networks specify the schedule which the program will operate. The Technical Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 30 refs., 13 figs., 4 tabs

  1. Pulling History from the Waste Stream: Identification and Collection of Manhattan Project and Cold War Era Artifacts on the Hanford Site

    International Nuclear Information System (INIS)

    Marceau, Thomas E.; Watson, Thomas L.

    2013-01-01

    One man's trash is another man's treasure. Not everything called 'waste' is meant for the refuse pile. The mission of the Curation Program is at direct odds with the remediation objectives of the Hanford Site. While others are busily tearing down and burying the Site's physical structures and their associated contents, the Curation Program seeks to preserve the tangible elements of the Site's history from these structures for future generations before they flow into the waste stream. Under the provisions of a Programmatic Agreement, Cultural Resources staff initiated a project to identify and collect artifacts and archives that have historic or interpretive value in documenting the role of the Hanford Site throughout the Manhattan Project and Cold War Era. The genesis of Hanford's modern day Curation Program, its evolution over nearly two decades, issues encountered, and lessons learned along the way -- particularly the importance of upper management advocacy, when and how identification efforts should be accomplished, the challenges of working within a radiological setting, and the importance of first hand information -- are presented

  2. Pulling History from the Waste Stream: Identification and Collection of Manhattan Project and Cold War Era Artifacts on the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Marceau, Thomas E.; Watson, Thomas L.

    2013-11-13

    One man's trash is another man's treasure. Not everything called "waste" is meant for the refuse pile. The mission of the Curation Program is at direct odds with the remediation objectives of the Hanford Site. While others are busily tearing down and burying the Site's physical structures and their associated contents, the Curation Program seeks to preserve the tangible elements of the Site's history from these structures for future generations before they flow into the waste stream. Under the provisions of a Programmatic Agreement, Cultural Resources staff initiated a project to identify and collect artifacts and archives that have historic or interpretive value in documenting the role of the Hanford Site throughout the Manhattan Project and Cold War Era. The genesis of Hanford's modern day Curation Program, its evolution over nearly two decades, issues encountered, and lessons learned along the way -- particularly the importance of upper management advocacy, when and how identification efforts should be accomplished, the challenges of working within a radiological setting, and the importance of first hand information -- are presented.

  3. The use of UAVs to monitor archeological sites: the case study of Choirokoitia within the PROTHEGO project

    Science.gov (United States)

    Themistocleous, K.

    2017-09-01

    PROTHEGO (PROTection of European Cultural HEritage from GeO-hazards) is a collaborative research project funded in the framework of the Joint Programming Initiative on Cultural Heritage and Global Change (JPICH) - Heritage Plus in 2015-2018 (www.prothego.eu). PROTHEGO aims to make an innovative contribution towards the analysis of geo-hazards in areas of cultural heritage, and uses novel space technology for the management of sites and world heritage monuments located throughout Europe, using specialized remote sensing techniques. Τhe methodology will include the 395 monuments of UNESCO in Europe, with case studies conducted in 4 UNESCO sites in England, Spain, Italy and Cyprus. For the Cyprus case study in Choirokoitia, Unmanned Aerial Vehicles (UAVs) are used to monitor and assess the risk from natural hazards on the archaeological site to evaluate cultural heritage sites deformation. The UAVs were flown over the study area to produce time-series data, including orthoimages, 3D models and digital elevation models of the Choirokoitia site in order to identify changes in the area caused by natural hazards.

  4. Preliminary Site Characterization Report, Rulsion Site, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    This report is a summary of environmental information gathered during a review of the documents pertaining to Project Rulison and interviews with personnel who worked on the project. Project Rulison was part of Operation Plowshare (a program designed to explore peaceful uses for nuclear devices). The project consisted of detonating a 43-kiloton nuclear device on September 10, 1969, in western Colorado to stimulate natural gas production. Following the detonation, a reentry well was drilled and several gas production tests were conducted. The reentry well was shut-in after the last gas production test and was held in standby condition until the general cleanup was undertaken in 1972. A final cleanup was conducted after the emplacement and testing wells were plugged in 1976. However, some surface radiologic contamination resulted from decontamination of the drilling equipment and fallout from the gas flaring during drilling operations. With the exception of the drilling effluent pond, all surface contamination at the Rulison Site was removed during the cleanup operations. All mudpits and other excavations were backfilled, and both upper and lower drilling pads were leveled and dressed. This report provides information regarding known or suspected areas of contamination, previous cleanup activities, analytical results, a review of the regulatory status, the site`s physical environment, and future recommendations for Project Ruhson. Based on this research, several potential areas of contamination have been identified. These include the drilling effluent pond and mudpits used during drilling operations. In addition, contamination could migrate in the gas horizon.

  5. Ground Characterization Studies in Canakkale Pilot Site of LIQUEFACT Project

    Science.gov (United States)

    Ozcep, F.; Oztoprak, S.; Aysal, N.; Bozbey, I.; Tezel, O.; Ozer, C.; Sargin, S.; Bekin, E.; Almasraf, M.; Cengiz Cinku, M.; Ozdemir, K.

    2017-12-01

    The our aim is to outline the ground characterisation studies in Canakkale test site. Study is based on the EU H2020 LIQUEFACT project entitled "Liquefact: Assessment and mitigation of liquefaction potential across Europe: a holistic approach to protect structures / infrastructures for improved resilience to earthquake-induced liquefaction disasters". Objectives and extent of ground characterization for Canakkale test site includes pre-existing soil investigation studies and complementary field studies. There were several SPT and geophysical tests carried out in the study area. Within the context of the complementary tests, six (6) study areas in the test site were chosen and complementary tests were carried out in these areas. In these areas, additional boreholes were opened and SPT tests were performed. It was decided that additional CPT (CPTU and SCPT) and Marchetti Dilatometer (DMT) tests should be carried out within the scope of the complementary testing. Seismic refraction, MASW and micro tremor measurements had been carried out in pre-existing studies. Shear wave velocities obtained from MASW measurements were evaluated to the most rigorous level. These tests were downhole seismic, PS-logging, seismic refraction, 2D-ReMi, MASW, micro tremor (H/V Nakamura method), 2D resistivity and resonance acoustic profiling (RAP). RAP is a new technique which will be explained briefly in the relevant section. Dynamic soil properties had not been measured in pre-existing studies, therefore these properties were investigated within the scope of the complementary tests. Selection of specific experimental tests of the complementary campaign was based on cost-benefit considerations Within the context of complementary field studies, dynamic soil properties were measured using resonant column and cyclic direct shear tests. Several sieve analyses and Atterberg Limits tests which were documented in the pre-existing studies were evaluated. In the complementary study carried out

  6. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site: Final

    International Nuclear Information System (INIS)

    1994-01-01

    Thorium 230 (Th-230) at the Gunnison, Colorado processing site will require remediation, however, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Therefore, to effectively remediate the site with respect to Radium 226 (Ra-226) and Th-230, the following supplemental standard is proposed: In situ Ra-26 will be remediated to the EPA soil cleanup standards independent of groundwater considerations. In situ Th-230 concentrations will be remediated in the region above the encountered water table so the 1000-year projected Ra-226 concentration complies with the EPA soil cleanup concentration limits. If elevated Th-230 persists to the water table, an additional foot of excavation will be performed and the grid will be backfilled. Excavated grids will be backfilled to the final remedial action grade with clean cobbly soil. Final grid verification that is required below the water table will be performed by extracting and analyzing a single bulk soil sample with the bucket of a backhoe. Modeled surface radon flux values will be estimated and documented. A recommendation will be made that land records should be annotated to identify the presence of residual Th-230

  7. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    International Nuclear Information System (INIS)

    Boliver, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP

  8. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

  9. Project Strategy For The Remediation And Disposition Of Legacy Transuranic Waste At The Savannah River Site, South Carolina, USA

    International Nuclear Information System (INIS)

    Rodriguez, M.

    2010-01-01

    This paper discusses the Savannah River Site Accelerated Transuranic (TRU) Waste Project that was initiated in April of 2009 to accelerate the disposition of remaining legacy transuranic waste at the site. An overview of the project execution strategy that was implemented is discussed along with the lessons learned, challenges and improvements to date associated with waste characterization, facility modifications, startup planning, and remediation activities. The legacy waste was generated from approximately 1970 through 1990 and originated both on site as well as at multiple US Department of Energy sites. Approximately two thirds of the waste was previously dispositioned from 2006 to 2008, with the remaining one third being the more hazardous waste due to its activity (curie content) and the plutonium isotope Pu-238 quantities in the waste. The project strategy is a phased approach beginning with the lower activity waste in existing facilities while upgrades are made to support remediation of the higher activity waste. Five waste remediation process lines will be used to support the full remediation efforts which involve receipt of the legacy waste container, removal of prohibited items, venting of containers, and resizing of contents to fit into current approved waste shipping containers. Modifications have been minimized to the extent possible to meet the accelerated goals and involve limited upgrades to address life safety requirements, radiological containment needs, and handling equipment for the larger waste containers. Upgrades are also in progress for implementation of the TRUPACT III for the shipment of Standard Large Boxes to the Waste Isolation Pilot Plant, the US TRU waste repository. The use of this larger shipping container is necessary for approximately 20% of the waste by volume due to limited size reduction capability. To date, approximately 25% of the waste has been dispositioned, and several improvements have been made to the overall processing

  10. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    Ground water in the uppermost aquifer beneath and downgradient from the Spook site was contaminated by uranium-processing activities that occurred from 1962 until 1966. Contamination from the tailings pile and the acid pond (including uranium, selenium, nitrate, and radium-226 and -228) leached into the subsurface by infiltration and migrated into ground water, forming a plume extending approximately 2,500 feet (ft) (760 meters [m]) downgradient from the site. The surface remedial action at the Spook site under Subpart A of 40 CFR Part 192 consisted of stabilizing the uranium mill tailings and other residual radioactive materials in a disposal cell in the bottom of the Spook open-pit mine and covering the cell with overburden material. The ground water protection strategy was supplemental standards based on Class 3 ground water in the uppermost aquifer because of widespread ambient contamination. The proposed ground water protection strategy to comply with Subpart B of 40 CFR Part 192 at the Spook site is to perform no remediation. This strategy is based on ground water in the uppermost aquifer (also the zone of contamination) being classified as Class 3, which allows the application of supplemental standards. Class 3 ground water beneath the Spook site is neither a current nor a potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed in public water supply systems

  11. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  12. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  13. Technical know-how of site descriptive modeling for site characterization - 59089

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Doke, Ryosuke; Niizato, Tadafumi; Yasue, Ken-ichi

    2012-01-01

    The site descriptive model covering the current status of characteristics of geological environment and the site evolution model for estimation of the long-term evolution of site conditions are used to integrate multi-disciplinary investigation results. It is important to evaluate uncertainties in the models, to specify issues regarding the uncertainties and to prioritize the resolution of specified issues, for the planning of site characterization. There is a large quantity of technical know-how in the modeling process. It is important to record the technical know-how with transparency and traceability, since site characterization projects generally need long duration. The transfer of the technical know-how accumulated in the research and development (R and D) phase to the implementation phase is equally important. The aim of this study is to support the planning of initial surface-based site characterizations based on the technical know-how accumulated from the underground research laboratory projects. These projects are broad scientific studies of the deep geological environment and provide a technical basis for the geological disposal of high-level radioactive wastes. In this study, a comprehensive task flow from acquisition of existing data to planning of field investigations through the modeling has been specified. Specific task flow and decision-making process to perform the tasks have been specified. (authors)

  14. Ground motion predictions

    Energy Technology Data Exchange (ETDEWEB)

    Loux, P C [Environmental Research Corporation, Alexandria, VA (United States)

    1969-07-01

    Nuclear generated ground motion is defined and then related to the physical parameters that cause it. Techniques employed for prediction of ground motion peak amplitude, frequency spectra and response spectra are explored, with initial emphasis on the analysis of data collected at the Nevada Test Site (NTS). NTS postshot measurements are compared with pre-shot predictions. Applicability of these techniques to new areas, for example, Plowshare sites, must be questioned. Fortunately, the Atomic Energy Commission is sponsoring complementary studies to improve prediction capabilities primarily in new locations outside the NTS region. Some of these are discussed in the light of anomalous seismic behavior, and comparisons are given showing theoretical versus experimental results. In conclusion, current ground motion prediction techniques are applied to events off the NTS. Predictions are compared with measurements for the event Faultless and for the Plowshare events, Gasbuggy, Cabriolet, and Buggy I. (author)

  15. Ground motion predictions

    International Nuclear Information System (INIS)

    Loux, P.C.

    1969-01-01

    Nuclear generated ground motion is defined and then related to the physical parameters that cause it. Techniques employed for prediction of ground motion peak amplitude, frequency spectra and response spectra are explored, with initial emphasis on the analysis of data collected at the Nevada Test Site (NTS). NTS postshot measurements are compared with pre-shot predictions. Applicability of these techniques to new areas, for example, Plowshare sites, must be questioned. Fortunately, the Atomic Energy Commission is sponsoring complementary studies to improve prediction capabilities primarily in new locations outside the NTS region. Some of these are discussed in the light of anomalous seismic behavior, and comparisons are given showing theoretical versus experimental results. In conclusion, current ground motion prediction techniques are applied to events off the NTS. Predictions are compared with measurements for the event Faultless and for the Plowshare events, Gasbuggy, Cabriolet, and Buggy I. (author)

  16. Bayesian spatial prediction of the site index in the study of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Xiaoqian Sun; Zhuoqiong He; John Kabrick

    2008-01-01

    This paper presents a Bayesian spatial method for analysing the site index data from the Missouri Ozark Forest Ecosystem Project (MOFEP). Based on ecological background and availability, we select three variables, the aspect class, the soil depth and the land type association as covariates for analysis. To allow great flexibility of the smoothness of the random field,...

  17. Rock mass mechanical property estimations for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Lin, M.; Hardy, M.P.; Bauer, S.J.

    1993-06-01

    Rock mass mechanical properties are important in the design of drifts and ramps. These properties are used in evaluations of the impacts of thermomechanical loading of potential host rock within the Yucca Mountain Site Characterization Project. Representative intact rock and joint mechanical properties were selected for welded and nonwelded tuffs from the currently available data sources. Rock mass qualities were then estimated using both the Norwegian Geotechnical Institute (Q) and Geomechanics Rating (RMR) systems. Rock mass mechanical properties were developed based on estimates of rock mass quality, the current knowledge of intact properties, and fracture/joint characteristics. Empirical relationships developed to correlate the rock mass quality indices and the rock mass mechanical properties were then used to estimate the range of rock mass mechanical properties

  18. Borehole induction logging for the Dynamic Underground Stripping Project LLNL gasoline spill site

    International Nuclear Information System (INIS)

    Boyd, S.; Newmark, R.; Wilt, M.

    1994-01-01

    Borehole induction logs were acquired for the purpose of characterizing subsurface physical properties and monitoring steam clean up activities at the Lawrence Livermore National Laboratory. This work was part of the Dynamic Underground Stripping Project's demonstrated clean up of a gasoline spin. The site is composed of unconsolidated days, sands and gravels which contain gasoline both above and below the water table. Induction logs were used to characterize lithology, to provide ''ground truth'' resistivity values for electrical resistance tomography (ERT), and to monitor the movement of an underground steam plume used to heat the soil and drive volatile organic compounds (VOCs) to the extraction wells

  19. A future for nuclear sites beyond their service life. Nuclear site value development

    International Nuclear Information System (INIS)

    2008-01-01

    As the nuclear industry moves into a new development phase, many facilities built in the fifties and sixties are reaching the end of their service life. Dismantling them and rehabilitating the sites on which they stand is a major industrial challenge which will give rise to a number of new projects. AREVA has more than 20 years' experience in these highly technical fields. As more and more sites reach the end of their service life, AREVA considers nuclear site value development as a fully-fledged industrial activity. The group's competencies in this field have been grouped together to form a dedicated entity: the Nuclear Site Value Development Business Unit, created in 2008. Several billion euros are invested in site value development projects which are far-reaching and complex, and often last for several decades. Long before work actually begins, lengthy studies and preparations are required to schedule operations, select the techniques to be used and optimize costs and deadlines. The Nuclear Site Value Development BU is currently working on four major projects involving its own facilities and those of the CEA: - La Hague: dismantling of the first generation of used fuel recycling facilities. Between 1966 and 1998, almost 5,000 tons of used fuel from graphite-moderated gas-cooled reactors, 4,500 tons of light water reactor fuel, as well as fuel from fast reactors and research reactors, were treated at UP2 400, the very first industrial recycling plant on the La Hague site. - Marcoule: first-time dismantling of a recycling plant. 1,000 rooms to be cleaned up, 30,000 tons of waste to be treated, 30 years of work. - Cadarache: first-time dismantling of a Mox fuel fabrication plant. The Cadarache plant was commissioned in 1962 to fabricate fuel for fast reactors; this was followed by MOX fuel for light water reactors, an activity which continued until the plant was shut down in 2003. - Annecy and Veurey: giving a new lease of life to former industrial sites in built

  20. A review and assessment of variable density ground water flow effects on plume formation at UMTRA project sites

    International Nuclear Information System (INIS)

    1995-01-01

    A standard assumption when evaluating the migration of plumes in ground water is that the impacted ground water has the same density as the native ground water. Thus density is assumed to be constant, and does not influence plume migration. This assumption is valid only for water with relatively low total dissolved solids (TDS) or a low difference in TDS between water introduced from milling processes and native ground water. Analyses in the literature suggest that relatively minor density differences can significantly affect plume migration. Density differences as small as 0.3 percent are known to cause noticeable effects on the plume migration path. The primary effect of density on plume migration is deeper migration than would be expected in the arid environments typically present at Uranium Mill Tailings Remedial Action (UMTRA) Project sites, where little or no natural recharge is available to drive the plume into the aquifer. It is also possible that at some UMTRA Project sites, a synergistic affect occurred during milling operations, where the mounding created by tailings drainage (which created a downward vertical gradient) and the density contrast between the process water and native ground water acted together, driving constituents deeper into the aquifer than either process would alone. Numerical experiments were performed with the U.S. Geological Survey saturated unsaturated transport (SUTRA) model. This is a finite-element model capable of simulating the effects of variable fluid density on ground water flow and solute transport. The simulated aquifer parameters generally are representative of the Shiprock, New Mexico, UMTRA Project site where some of the highest TDS water from processing has been observed

  1. Determination of aerosol size distributions at uranium mill tailings remedial action project sites

    International Nuclear Information System (INIS)

    Newton, G.J.; Reif, R.H.; Hoover, M.D.

    1994-01-01

    The U.S. Department of Energy (DOE) has an ongoing program, the Uranium Mill Tailings Remedial Action (UMTRA) Project, to stabilize piles of uranium mill tailings in order to reduce the potential radiological hazards to the public. Protection of workers and the general public against airborne radioactivity during remedial action is a top priority at the UMTRA Project. The primary occupational radionuclides of concern are 230 Th, 226 Ra, 210 Pb, 210 Po, and the short-lived decay products of 222 Rn with 230 Th causing the majority of the committed effective dose equivalent (CEDE) from inhaling uranium mill tailings. Prior to this study, a default particle size of 1.0 μm activity median aerodynamic diameter (AMAD) was assumed for airborne radioactive tailings dust. Because of recent changes in DOE requirements, all DOE operations are now required to use the CEDE methodology, instead of the annual effective dose equivalent (AEDE) methodology, to evaluate internal radiation exposures. Under the transition from AEDE to CEDE, with a 1.0 μm AMAD particle size, lower bioassay action levels would be required for the UMTRA Project. This translates into an expanded internal dosimetry program where significantly more bioassay monitoring would be required at the UMTRA Project sites. However, for situations where the particle size distribution is known to differ significantly from 1.0 μm AMAD, the DOE allows for corrections to be made to both the estimated dose to workers and the derived air concentration (DAC) values. For particle sizes larger than 1.0 μm AMAD, the calculated CEDE from inhaling tailings would be relatively lower

  2. Report of early site suitability evaluation of the potential repository site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Younker, J.L.; Andrews, W.B.; Fasano, G.A.; Herrington, C.C.; Mattson, S.R.; Murray, R.C. [Science Applications International Corp., Las Vegas, NV (United States); Ballou, L.B.; Revelli, M.A. [Lawrence Livermore National Lab., CA (United States); Ducharme, A.R.; Shephard, L.E. [Sandia National Labs., Albuquerque, NM (United States); Dudley, W.W.; Hoxie, D.T. [Geological Survey, Denver, CO (United States); Herbst, R.J.; Patera, E.A. [Los Alamos National Lab., NM (United States); Judd, B.R. [Decision Analysis Co., Portola Valley, CA (United States); Docka, J.A.; Rickertsen, L.D. [Weston Technical Associates, Washington, DC (United States)

    1992-01-01

    This study evaluated the technical suitability of Yucca Mountain, Nevada, as a potential site for a mined geologic repository for the permanent disposal of radioactive waste. The evaluation was conducted primarily to determine early in the site characterization program if there are any features or conditions at the site that indicate it is unsuitable for repository development. A secondary purpose was to determine the status of knowledge in the major technical areas that affect the suitability of the site. This early site suitability evaluation (ESSE) was conducted by a team of technical personnel at the request of the Associate Director of the US Department of Energy (DOE) Office of Geologic Disposal, a unit within the DOE`s Office of Civilian Radioactive Waste Management. The Yucca Mountain site has been the subject of such evaluations for over a decade. In 1983, the site was evaluated as part of a screening process to identify potentially acceptable sites. The site was evaluated in greater detail and found suitable for site characterization as part of the Environmental Assessment (EA) (DOE, 1986) required by the Nuclear Waste Policy Act of 1982 (NWPA). Additional site data were compiled during the preparation of the Site Characterization Plan (SCP) (DOE, 1988a). This early site suitability evaluation has considered information that was used in preparing both-documents, along with recent information obtained since the EA and SCP were published. This body of information is referred to in this report as ``current information`` or ``available evidence.``

  3. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  4. Evaluation of surface water treatment and discharge options for the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Goyette, M.L.; MacDonell, M.M.

    1992-01-01

    The US Department of Energy (DOE), under its Environmental Restoration and Waste Management Program, is responsible for conducting response actions at the Weldon Spring site in St. Charles County, Missouri. The site consists of two noncontiguous areas: (1) the chemical plant area, which includes four raffinate pits and two small ponds, and (2) a 3.6-ha (9-acre) quarry located about 6.4 km (4 mi) southwest of the chemical plant area. Both of these areas became chemically and radioactively contaminated as a result of processing and disposal activities that took place from the 1940s through 1960s. The Weldon Spring site, located about 48 km (30 mi) west of St. Louis, is listed on the National Priorities List of the US Environmental Protection Agency. Nitroaromatic explosives were processed by the Army at the chemical plant area during the 1940s, and radioactive materials were processed by DOE's predecessor agency (the Atomic Energy Commission) during the 1950s and 1960s. Overall remediation of the Weldon Spring site is being addressed through the Weldon Spring Site Remedial Action Project, and it consists of several components. One component is the management of radioactively and chemically contaminated surface water impoundments at the chemical plant area -- i.e., the four raffinate pits, Frog Pond, and Ash Pond which was addressed under a separate action and documented in an engineering evaluation/cost analysis report. This report discusses the evaluation of surface water treatment at the Weldon Spring site

  5. A tool for improving the management of social and human rights risks at project sites: The Human Rights Sphere

    NARCIS (Netherlands)

    van der Ploeg, Lidewij; Vanclay, Frank

    2017-01-01

    This paper identifies and addresses the challenges of implementing the corporate responsibility to respect human rights in practice at project sites. To support on-ground operational staff, we offer the Human Rights Sphere (HRS), a practical tool we developed from empirical research in three

  6. A tool for improving the management of social and human rights risks at project sites : The Human Rights Sphere

    NARCIS (Netherlands)

    van der Ploeg, Lidewij; Vanclay, Frank

    2017-01-01

    This paper identifies and addresses the challenges of implementing the corporate responsibility to respect human rights in practice at project sites. To support on-ground operational staff, we offer the Human Rights Sphere (HRS), a practical tool we developed from empirical research in three

  7. Site characterization report for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1982-11-01

    This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues

  8. Fernald Environmental Management Project 1995 site environmental report summary

    International Nuclear Information System (INIS)

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment

  9. The Hanford Site solid waste treatment project; Waste Receiving and Processing (WRAP) Facility

    International Nuclear Information System (INIS)

    Roberts, R.J.

    1991-01-01

    The Waste Receiving and Processing (WRAP) Facility will provide treatment and temporary storage (consisting of in-process storage) for radioactive and radioactive/hazardous mixed waste. This facility must be constructed and operated in compliance with all appropriate US Department of Energy (DOE) orders and Resource Conservation and Recovery Act (RCRA) regulations. The WRAP Facility will examine and certify, segregate/sort, and treat for disposal suspect transuranic (TRU) wastes in drums and boxes placed in 20-yr retrievable storage since 1970; low-level radioactive mixed waste (RMW) generated and placed into storage at the Hanford Site since 1987; designated remote-handled wastes; and newly generated TRU and RMW wastes from high-level waste (HLW) recovery and processing operations. In order to accelerated the WRAP Project, a partitioning of the facility functions was done in two phases as a means to expedite those parts of the WRAP duties that were well understood and used established technology, while allowing more time to better define the processing functions needed for the remainder of WRAP. The WRAP Module 1 phase one, is to provide the necessary nondestructive examination and nondestructive assay services, as well as all transuranic package transporter (TRUPACT-2) shipping for both WRAP Project phases, with heating, ventilation, and air conditioning; change rooms; and administrative services. Phase two of the project, WRAP Module 2, will provide all necessary waste treatment facilities for disposal of solid wastes. 1 tab

  10. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  11. Shippingport Station Decommissioning Project site release protocol

    International Nuclear Information System (INIS)

    Handy, J.W.

    1988-01-01

    The Richland, Washington field office of the DOE and its Remedial Actions Contractor, GE, took possession of the SSDP site in September 1984. In February of the following year, DOE-HQ issued generic, site independent guidelines taken from existing radiation protection standards. Basic generic dose limits were English equivalents of 1 mSv (100 mrem) per year averaged over the lifetime of any individual member of the general public. Hot spot limits were given. Occupied or habitable structures were limited to 5.2 x 10 -9 C/Kg h (20mR/h). Surface contamination was limited to standards plus average and maximum contact dose rates of 2 microGy (0.2 mrad) per hour and 10 microGy (1 mrad) per hour respectively. In addition, ''all exposures ... were to be limited to levels that (were) as low as reasonably achievable (ALARA).'' Authorized limits higher than these guidelines were allowed under given exceptional circumstances. GE determined the allowable radionuclide concentrations that could remain in soil and included rubble, and not dose the resident farmer to more than 1 mSv (100 mrem) per year. Under more conservative scenarios, however, exposures were controlled for buried, potentially occupationally occupiable, concrete substructures, to souvenir items, or to buried, but potentially exposed, concrete slabs. GE incorporated the scenario's pathways into a document implementing specific site release criteria which cannot be exceeded if the site is to be released unconditionally. 3 refs., 1 fig

  12. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  13. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-04-23

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  14. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2003-01-01

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  15. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  16. Prediction of Pseudo relative velocity response spectra at Yucca Mountain for underground nuclear explosions conducted in the Pahute Mesa testing area at the Nevada testing site; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, J.S.

    1991-12-01

    The Yucca Mountain Site Characterization Project (YMP), managed by the Office of Geologic Disposal of the Office of Civilian Radioactive Waste Management of the US Department of Energy, is examining the feasibility of siting a repository for commercial, high-level nuclear wastes at Yucca Mountain on and adjacent to the Nevada Test Site (NTS). This work, intended to extend our understanding of the ground motion at Yucca Mountain resulting from testing of nuclear weapons on the NTS, was funded by the Yucca Mountain project and the Military Applications Weapons Test Program. This report summarizes one aspect of the weapons test seismic investigations conducted in FY88. Pseudo relative velocity response spectra (PSRV) have been calculated for a large body of surface ground motions generated by underground nuclear explosions. These spectra have been analyzed and fit using multiple linear regression techniques to develop a credible prediction technique for surface PSRVs. In addition, a technique for estimating downhole PSRVs at specific stations is included. A data summary, data analysis, prediction development, prediction evaluation, software summary and FORTRAN listing of the prediction technique are included in this report.

  17. Site productivity and forest carbon stocks in the United States: Analysis and implications for forest offset project planning

    Science.gov (United States)

    Coeli M. Hoover; James E. Smith

    2012-01-01

    The documented role of United States forests in sequestering carbon, the relatively low cost of forest-based mitigation, and the many co-benefits of increasing forest carbon stocks all contribute to the ongoing trend in the establishment of forest-based carbon offset projects. We present a broad analysis of forest inventory data using site quality indicators to provide...

  18. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  19. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  20. Predictions of tracer transport in interwell tracer tests at the C-Hole complex. Yucca Mountain site characterization project report milestone 4077

    International Nuclear Information System (INIS)

    Reimus, P.W.

    1996-09-01

    This report presents predictions of tracer transport in interwell tracer tests that are to be conducted at the C-Hole complex at the Nevada Test Site on behalf of the Yucca Mountain Site Characterization Project. The predictions are used to make specific recommendations about the manner in which the tracer test should be conducted to best satisfy the needs of the Project. The objective of he tracer tests is to study flow and species transport under saturated conditions in the fractured tuffs near Yucca Mountain, Nevada, the site of a potential high-level nuclear waste repository. The potential repository will be located in the unsaturated zone within Yucca Mountain. The saturated zone beneath and around the mountain represents the final barrier to transport to the accessible environment that radionuclides will encounter if they breach the engineered barriers within the repository and the barriers to flow and transport provided by the unsaturated zone. Background information on the C-Holes is provided in Section 1.1, and the planned tracer testing program is discussed in Section 1.2

  1. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  2. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  3. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Science.gov (United States)

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  4. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  5. Hanford Site sustainable development initiatives

    International Nuclear Information System (INIS)

    Sullivan, C.T.

    1994-05-01

    Since the days of the Manhattan Project of World War II, the economic well being of the Tri-Cities (Pasco, Kennewick, and Richland) of Washington State has been tied to the US Department of Energy missions at the nearby Hanford Site. As missions at the Site changed, so did the economic vitality of the region. The Hanford Site is now poised to complete its final mission, that of environmental restoration. When restoration is completed, the Site may be closed and the effect on the local economy will be devastating if action is not taken now. To that end, economic diversification and transition are being planned. To facilitate the process, the Hanford Site will become a sustainable development demonstration project

  6. Radiotracer studies in cavernous marble at Kamathikhairy Dam site, Pench Project (Maharashtra)

    International Nuclear Information System (INIS)

    Nath, Ravendra; Mahajan, N.M.; Vaidya, S.D.

    1982-01-01

    Radiotracer studies with tritiated water at Pench Project site conclusively proved that the cavernous marble upstream of the saddle dam is continuous with the marble occuring near the spillway portion of the main dam and that there is fast subterranean flow of water through the cavernous marble here. It is also established that this marble band upstream of the dam is interconnected with the marble band occuring in the vicinity of Pali village about 3 km downstream of the dam. Though big unclogged subterranean channels do not seem to exist in this region, which might have resulted in heavy leakage from the impounded reservoir, yet the possibility of some leakage of the water through the cavernous marble cannot be ruled out, due to the interconnection of the marble occuring upstream of the dam with the downstream marble band. (author)

  7. Hanford Site Composite Analysis Technical Approach Description: Radionuclide Inventory and Waste Site Selection Process.

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Will E.; Mehta, Sunil

    2017-09-13

    The updated Hanford Site Composite Analysis will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at Hanford following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management (DOE, 2001), related to managing low-level waste disposal facilities at the Hanford Site.

  8. Ground-water monitoring compliance projects for Hanford Site Facilities: Progress report for the period April 1--June 30, 1988: Volume 1, Text

    International Nuclear Information System (INIS)

    1988-09-01

    This is Volume 1 of a two-volume set of documents that describes the progress of 10 Hanford Site ground-water monitoring projects for the period April 1 to June 30, 1988. This volume discusses the projects; Volume 2 provides as-built diagrams, drilling logs, and geophysical logs for wells drilled during this period in the 100-N Area and near the 216-A-36B Crib

  9. Site Restoration

    Energy Technology Data Exchange (ETDEWEB)

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2001-04-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations.

  10. Site Restoration

    International Nuclear Information System (INIS)

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A.

    2001-01-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations

  11. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  12. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002); FINAL

    International Nuclear Information System (INIS)

    2002-01-01

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document

  13. Numerical simulation of stress wave propagation from underground nuclear explosions

    Energy Technology Data Exchange (ETDEWEB)

    Cherry, J T; Petersen, F L [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1970-05-01

    This paper presents a numerical model of stress wave propagation (SOC) which uses material properties data from a preshot testing program to predict the stress-induced effects on the rock mass involved in a Plowshare application. SOC calculates stress and particle velocity history, cavity radius, extent of brittle failure, and the rock's efficiency for transmitting stress. The calculations are based on an equation of state for the rock, which is developed from preshot field and laboratory measurements of the rock properties. The field measurements, made by hole logging, determine in situ values of the rock's density, water content, and propagation velocity for elastic waves. These logs also are useful in judging the layering of the rock and in choosing which core samples to test in the laboratory. The laboratory analysis of rock cores includes determination of hydrostatic compressibility to 40 kb, triaxial strength data, tensile strength, Hugoniot elastic limit, and, for the rock near the point of detonation, high-pressure Hugoniot data. Equation-of-state data are presented for rock from three sites subjected to high explosive or underground nuclear shots, including the Hardhat and Gasbuggy sites. SOC calculations of the effects of these two shots on the surrounding rock are compared with the observed effects. In both cases SOC predicts the size of the cavity quite closely. Results of the Gasbuggy calculations indicate that useful predictions of cavity size and chimney height can be made when an adequate preshot testing program is run to determine the rock's equation of state. Seismic coupling is very sensitive to the low-pressure part of the equation of state, and its successful prediction depends on agreement between the logging data and the static compressibility data. In general, it appears that enough progress has been made in calculating stress wave propagation to begin looking at derived numbers, such as number of cracks per zone, for some insight into the

  14. Numerical simulation of stress wave propagation from underground nuclear explosions

    International Nuclear Information System (INIS)

    Cherry, J.T.; Petersen, F.L.

    1970-01-01

    This paper presents a numerical model of stress wave propagation (SOC) which uses material properties data from a preshot testing program to predict the stress-induced effects on the rock mass involved in a Plowshare application. SOC calculates stress and particle velocity history, cavity radius, extent of brittle failure, and the rock's efficiency for transmitting stress. The calculations are based on an equation of state for the rock, which is developed from preshot field and laboratory measurements of the rock properties. The field measurements, made by hole logging, determine in situ values of the rock's density, water content, and propagation velocity for elastic waves. These logs also are useful in judging the layering of the rock and in choosing which core samples to test in the laboratory. The laboratory analysis of rock cores includes determination of hydrostatic compressibility to 40 kb, triaxial strength data, tensile strength, Hugoniot elastic limit, and, for the rock near the point of detonation, high-pressure Hugoniot data. Equation-of-state data are presented for rock from three sites subjected to high explosive or underground nuclear shots, including the Hardhat and Gasbuggy sites. SOC calculations of the effects of these two shots on the surrounding rock are compared with the observed effects. In both cases SOC predicts the size of the cavity quite closely. Results of the Gasbuggy calculations indicate that useful predictions of cavity size and chimney height can be made when an adequate preshot testing program is run to determine the rock's equation of state. Seismic coupling is very sensitive to the low-pressure part of the equation of state, and its successful prediction depends on agreement between the logging data and the static compressibility data. In general, it appears that enough progress has been made in calculating stress wave propagation to begin looking at derived numbers, such as number of cracks per zone, for some insight into the

  15. Symposium on Engineering With Nuclear Explosives January 14-16, 1970, Las Vegas, Nevada. Volume 1

    Science.gov (United States)

    1970-05-01

    by Senator Mike Gravel (D. - Alas .) and co- sponsored by Senator Edmund A. Muskie (D. -Me.) to establish a 15-member commission to examine the potential...Gasbuggy was an experiment in nuclear stimulation. of a gas-bearing formation in Rio Arriba County, New Mexico, sponsored jointly by the U. S. Atomic

  16. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  17. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  18. An assessment of potential hydrologic and ecologic impacts of constructing mitigation wetlands, Rifle, Colorado, UMTRA project sites

    International Nuclear Information System (INIS)

    1995-04-01

    This-assessment examines the consequences and risks that could result from the proposed construction of mitigation wetlands at the New and Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Rifle, Colorado. Remediation of surface contamination at those sites is now under way. Preexisting wetlands at or near the Old and New Rifle sites have been cleaned up, resulting in the loss of 0.7 and 10.5 wetland acres (ac) (0.28 and 4.2 hectares [ha]) respectively. Another 9.9 ac (4.0 ha) of wetlands are in the area of windblown contamination west of the New Rifle site. The US Army Corps of Engineers (USACE) has jurisdiction over the remediated wetlands. Before remedial action began, and before any wetlands were eliminated, the USACE issued a Section 404 Permit that included a mitigation plan for the wetlands to be lost. The mitigation plan calls for 34.2 ac (1 3.8 ha) of wetlands to be constructed at the south end and to the west of the New Rifle site. The mitigation wetlands would be constructed over and in the contaminated alluvial aquifer at the New Rifle site. As a result of the hydrologic characteristics of this aquifer, contaminated ground water would be expected to enter the environment through the proposed wetlands. A preliminary assessment was therefore required to assess any potential ecological risks associated with constructing the mitigation wetlands at the proposed location

  19. The surgical care improvement project and prevention of post-operative infection, including surgical site infection.

    Science.gov (United States)

    Rosenberger, Laura H; Politano, Amani D; Sawyer, Robert G

    2011-06-01

    In response to inconsistent compliance with infection prevention measures, the Centers for Medicare & Medicaid Services collaborated with the U.S. Centers for Disease Control and Prevention on the Surgical Infection Prevention (SIP) project, introduced in 2002. Quality improvement measures were developed to standardize processes to increase compliance. In 2006, the Surgical Care Improvement Project (SCIP) developed out of the SIP project and its process measures. These initiatives, published in the Specifications Manual for National Inpatient Quality Measures, outline process and outcome measures. This continually evolving manual is intended to provide standard quality measures to unify documentation and track standards of care. Seven of the SCIP initiatives apply to the peri-operative period: Prophylactic antibiotics should be received within 1 h prior to surgical incision (1), be selected for activity against the most probable antimicrobial contaminants (2), and be discontinued within 24 h after the surgery end-time (3); (4) euglycemia should be maintained, with well-controlled morning blood glucose concentrations on the first two post-operative days, especially in cardiac surgery patients; (6) hair at the surgical site should be removed with clippers or by depilatory methods, not with a blade; (9) urinary catheters are to be removed within the first two post-operative days; and (10) normothermia should be maintained peri-operatively. There is strong evidence that implementation of protocols that standardize practices reduce the risk of surgical infection. The SCIP initiative targets complications that account for a significant portion of preventable morbidity as well as cost. One of the goals of the SCIP guidelines was a 25% reduction in the incidence of surgical site infections from implementation through 2010. Process measures are becoming routine, and as we practice more evidence-based medicine, it falls to us, the surgeons and scientists, to be active

  20. The Niagara Falls Storage Site Remedial Action Project. Status update and summary of special features

    International Nuclear Information System (INIS)

    Campbell, L.F.; Coxon, G.D.

    1986-01-01

    The U.S. Department of Energy (DOE) and its Project Management Contractor, Bechtel National, Inc., are conducting remedial action at the Niagara Falls Storage Site (NFSS) near Lewiston, New York to stabilize low-level radioactive wastes stored at the site and to decontaminate over two dozen contaminated vicinity properties. Over the past 4 years a 10-acre interim waste containment facility has been developed at the site to hold the approximately 250,000 yd/sup 3/ of contaminated soil and rubble from the cleanup operations. Several existing buildings were demolished or modified for burial inside the containment area. In addition, residues inside a 165-ft-high concrete tower were transferred to one of the buildings inside the containment area using hydraulic mining techniques. The residues were dewatered and covered with clay to minimize radom emanation; the tower was demolished and the rubble disposed of in the containment area. Environmental monitoring will continue throughout the interim storage period. In addition, the surface and subsurface condition of the containment structure will be monitored to ensure that undesirable trends are detected in time for corrective action to be taken. The DOE Record of Decision on the long-term disposition of the NFSS is expected to be made by the end of April, 1986

  1. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    International Nuclear Information System (INIS)

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs

  2. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs.

  3. Hanford Site environmental management specification

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  4. Hanford Site environmental management specification

    International Nuclear Information System (INIS)

    Grygiel, M.L.

    1998-01-01

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL's application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents

  5. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  6. Site characterization in fractured crystalline rock

    International Nuclear Information System (INIS)

    Andersson, Peter; Andersson, J.E.; Gustafsson, E.; Nordqvist, R.; Voss, C.

    1993-03-01

    This report concerns a study which is part of the SKI performance assessment project SITE-94. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate Quality Assurance plan for Performance Assessments. (111 refs.)

  7. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N. J.

    2008-01-01

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project

  8. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  9. Industry potential of large scale uses for peaceful nuclear explosives

    Energy Technology Data Exchange (ETDEWEB)

    Russell, P L [Bureau of Mines, Denver, CO (United States)

    1969-07-01

    The industrial potential for peaceful uses of nuclear explosions entering a critical stage of development. Should Project Gasbuggy, an experiment to determine to what extent an underground nuclear explosion can stimulate the production of natural gas from low-permeability formations, prove a technical or economic success, a great step forward will have been made. Should other experiments now being considered in natural gas, oil shale, copper, coal, water resources, underground storage, and others, also demonstrate technical or economic advantage, it is conceivable to expect peaceful nuclear explosion to grow from our current rate of one or two experimental shots per year to hundreds of production explosions per year. This growth rate could be severely restricted or reduced to zero if public safety and environmental control cannot be exercised. (author)

  10. Industry potential of large scale uses for peaceful nuclear explosives

    International Nuclear Information System (INIS)

    Russell, P.L.

    1969-01-01

    The industrial potential for peaceful uses of nuclear explosions entering a critical stage of development. Should Project Gasbuggy, an experiment to determine to what extent an underground nuclear explosion can stimulate the production of natural gas from low-permeability formations, prove a technical or economic success, a great step forward will have been made. Should other experiments now being considered in natural gas, oil shale, copper, coal, water resources, underground storage, and others, also demonstrate technical or economic advantage, it is conceivable to expect peaceful nuclear explosion to grow from our current rate of one or two experimental shots per year to hundreds of production explosions per year. This growth rate could be severely restricted or reduced to zero if public safety and environmental control cannot be exercised. (author)

  11. Direct-current resistivity profiling at the Pecos River Ecosystem Project study site near Mentone, Texas, 2006

    Science.gov (United States)

    Teeple, Andrew; McDonald, Alyson K.; Payne, Jason; Kress, Wade H.

    2009-01-01

    The U.S. Geological Survey, in cooperation with Texas A&M University AgriLife, did a surface geophysical investigation at the Pecos River Ecosystem Project study site near Mentone in West Texas intended to determine shallow (to about 14 meters below the water [river] surface) subsurface composition (lithology) in and near treated (eradicated of all saltcedar) and control (untreated) riparian zone sites during June-August 2006. Land-based direct-current resistivity profiling was applied in a 240-meter section of the riverbank at the control site, and waterborne direct-current continuous resistivity profiling (CRP) was applied along a 2.279-kilometer reach of the river adjacent to both sites to collect shallow subsurface resistivity data. Inverse modeling was used to obtain a nonunique estimate of the true subsurface resistivity from apparent resistivity calculated from the field measurements. The land-based survey showed that the sub-surface at the control site generally is of relatively low resis-tivity down to about 4 meters below the water surface. Most of the section from about 4 to 10 meters below the water surface is of relatively high resistivity. The waterborne CRP surveys convey essentially the same electrical representation of the lithology at the control site to 10 meters below the water surface; but the CRP surveys show considerably lower resistivity than the land-based survey in the subsection from about 4 to 10 meters below the water surface. The CRP surveys along the 2.279-kilometer reach of the river adjacent to both the treated and control sites show the same relatively low resistivity zone from the riverbed to about 4 meters below the water surface evident at the control site. A slightly higher resistivity zone is observed from about 4 to 14 meters below the water surface along the upstream approximately one-half of the profile than along the downstream one-half. The variations in resistivity could not be matched to variations in lithology because

  12. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  13. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  14. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  15. Heat-flow and lateral seismic-velocity heterogeneities near Deep Sea Drilling Project-Ocean Drilling Program Site 504

    Science.gov (United States)

    Lowell, Robert P.; Stephen, Ralph A.

    1991-11-01

    Both conductive heat-flow and seismic-velocity data contain information relating to the permeability of the oceanic crust. Deep Sea Drilling Project-Ocean Drilling Program Site 504 is the only place where both detailed heat-flow and seismic-velocity field studies have been conducted at the same scale. In this paper we examine the correlation between heat flow and lateral heterogeneities in seismic velocity near Site 504. Observed heterogeneities in seismic velocity, which are thought to be related to variations in crack density in the upper 500 m of the basaltic crust, show little correlation with the heat-flow pattern. This lack of correlation highlights some of the current difficulties in using seismic-velocity data to infer details of spatial variations in permeability that are significant in controlling hydrothermal circulation.

  16. SYSTHESIS OF VOLCANISM STUDIES FOR THE YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT

    International Nuclear Information System (INIS)

    FV PERRY; GA CROWE; GA VALENTINE; LM BOWKER

    1997-01-01

    This report synthesizes the results of volcanism studies conducted by scientists at the Los Alamos National Laboratory and collaborating institutions on behalf of the Department of Energy's Yucca Mountain Project. Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The hazard of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Future volcanic events cannot be predicted with certainty but instead are estimated using formal methods of probabilistic volcanic hazard assessment (PVHA). Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The distribution, eruptive history, and geochronology of Plio-Quaternary basalt centers are described by individual center emphasizing the younger postcaldera basalt ( -7 events per year. Bounding probability estimates are used to assess possible implications of not drilling aeromagnetic anomalies in the Arnargosa Valley and Crater Flat. The results of simulation modeling are used to assess the sensitivity of the disruption probability for the location of northeast boundaries of volcanic zones near the Yucca Mountain site. A new section on modeling of radiological releases associated with surface and subsurface magmatic activity has been added to chapter 6. The modeling results are consistent with past total system performance assessments that show future volcanic and magmatic events are not significant components of repository performance and volcanism is not a priority issue for performance assessment studies

  17. Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2018-01-01

    The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who were independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.

  18. Preliminary site description Forsmark area - version 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina [ed.

    2005-06-01

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is undertaking site characterisation at two different locations, the Forsmark and Simpevarp areas, with the objective of siting a geological repository for spent nuclear fuel. An integrated component in the characterisation work is the development of a site descriptive model that constitutes a description of the site and its regional setting, covering the current state of the geosphere and the biosphere as well as those ongoing natural processes that affect their long-term evolution. The present report documents the site descriptive modelling activities (version 1.2) for the Forsmark area. The overall objectives of the version 1.2 site descriptive modelling are to produce and document an integrated description of the site and its regional environments based on the site-specific data available from the initial site investigations and to give recommendations on continued investigations. The modelling work is based on primary data, i.e. quality-assured, geoscientific and ecological field data available in the SKB databases SICADA and GIS, available July 31, 2004. The work has been conducted by a project group and associated discipline-specific working groups. The members of the project group represent the disciplines of geology, rock mechanics, thermal properties, hydrogeology, hydrogeochemistry, transport properties and surface ecosystems (including overburden, surface hydrogeochemistry and hydrology). In addition, some group members have specific qualifications of importance in this type of project e.g. expertise in RVS (Rock Visualisation System) modelling, GIS-modelling and in statistical data analysis. The overall strategy to achieve a site description is to develop discipline-specific models by interpretation and analyses of the primary data. The different discipline-specific models are then integrated into a site description. Methodologies for developing the discipline-specific models are documented in

  19. Preliminary site description Forsmark area - version 1.2

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2005-06-01

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is undertaking site characterisation at two different locations, the Forsmark and Simpevarp areas, with the objective of siting a geological repository for spent nuclear fuel. An integrated component in the characterisation work is the development of a site descriptive model that constitutes a description of the site and its regional setting, covering the current state of the geosphere and the biosphere as well as those ongoing natural processes that affect their long-term evolution. The present report documents the site descriptive modelling activities (version 1.2) for the Forsmark area. The overall objectives of the version 1.2 site descriptive modelling are to produce and document an integrated description of the site and its regional environments based on the site-specific data available from the initial site investigations and to give recommendations on continued investigations. The modelling work is based on primary data, i.e. quality-assured, geoscientific and ecological field data available in the SKB databases SICADA and GIS, available July 31, 2004. The work has been conducted by a project group and associated discipline-specific working groups. The members of the project group represent the disciplines of geology, rock mechanics, thermal properties, hydrogeology, hydrogeochemistry, transport properties and surface ecosystems (including overburden, surface hydrogeochemistry and hydrology). In addition, some group members have specific qualifications of importance in this type of project e.g. expertise in RVS (Rock Visualisation System) modelling, GIS-modelling and in statistical data analysis. The overall strategy to achieve a site description is to develop discipline-specific models by interpretation and analyses of the primary data. The different discipline-specific models are then integrated into a site description. Methodologies for developing the discipline-specific models are documented in

  20. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  1. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  2. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  3. VT Biodiversity Project - Aquatic Sites boundary lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) Exemplary aquatic sites in Vermont, both standing water and running water, are represented in this dataset. It is the result of an analysis by the...

  4. VT Biodiversity Project - Aquatic Sites boundary polygons

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) Exemplary aquatic sites in Vermont, both standing water and running water, are represented in this dataset. It is the result of an analysis by the...

  5. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  6. Projecting future solid waste management requirements on the Hanford Site

    International Nuclear Information System (INIS)

    Shaver, S.R.; Stiles, D.L.; Holter, G.M.; Anderson, B.C.

    1990-09-01

    The problem of treating and disposing of hazardous transuranic (TRU), low-level radioactive, and mixed waste has become a major concern of the public and the government. At the US Department of Energy's Hanford Site in Washington state, the problem is compounded by the need to characterize, retrieve, and treat the solid waste that was generated and stored for retrieval during the past 20 years. This paper discusses the development and application of a Solid Waste Projection Model that uses forecast volumes and characteristics of existing and future solid waste to address the treatment, storage, and disposal requirements at Hanford. The model uses a data-driven, object-oriented approach to assess the storage and treatment throughout requirements for each operation for each of the distinct waste classes and the accompanying cost of the storage and treatment operations. By defining the elements of each alternative for the total waste management system, the same database can be used for numerous analyses performed at different levels of detail. This approach also helps a variety of users with widely varying information requirements to use the model and helps achieve the high degree of flexibility needed to cope with changing regulations and evolving treatment and disposal technologies. 2 figs

  7. Bibliography of publications related to the Yucca Mountain Site Characterization Project prepared by U.S. Geological Survey personnel through April 1991

    International Nuclear Information System (INIS)

    Glanzman, V.M.

    1991-01-01

    Personnel of the US Geological Survey have participated in nuclear-waste management studies in the State of Nevada since the mid-1970's. A bibliography of publications prepared principally for the US Department of Energy Yucca Mountain Site Characterization Project (formerly Nevada Nuclear Waste Storage Investigations) through April 1991 contains 475 entries in alphabetical order. The listing includes publications prepared prior to the inception of the Nevada Nuclear Waste Storage Investigations Project in April 1977 and selected publications of interest to the Yucca Mountain region. 480 refs

  8. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  9. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  10. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  11. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  12. 78 FR 26356 - Notice of Environmental Site Review

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Environmental Site Review York Haven Power Company, LLC Project No. 1888-030. Exelon Generation Company, LLC Project No. 405-106. Exelon Generation Company, LLC Project No. 2355-018. On May 21, 22, and 23, 2013, Commission staff will hold an environmental site review for the...

  13. Site remediation: The naked truth

    International Nuclear Information System (INIS)

    Calloway, J.M.

    1991-01-01

    The objective of any company faced with an environmental site remediation project is to perform the cleanup effectively at the lowest possible cost. Today, there are a variety of techniques being applied in the remediation of sites involving soils and sludges. The most popular include: stabilization, incineration, bioremediation and off-site treatment. Dewatering may also play an integral role in a number of these approaches. Selecting the most cost-effective technique for remediation of soils and sludges can be a formidable undertaking, namely because it is often difficult to quantify certain expenses in advance of the project. In addition to providing general cost guidelines for various aspects of soil and sludge remediation, this paper will show how some significant cost factors can be affected by conditions related to specific remediation projects and the cleanup technology being applied

  14. Site characterization report for the basalt waste isolation project. Volume III

    International Nuclear Information System (INIS)

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 3 contains chapters 13 through 19: site issues and plans; geoengineering and repository design issues and plans; waste package and site geochemistry issues and plans; performance-assessment issues and plans; site characterization program; quality assurance; and identification of alternate sites

  15. Oil field rejuvenation work starts at 14 project sites

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  16. Method for assigning sites to projected generic nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date.

  17. Method for assigning sites to projected generic nuclear power plants

    International Nuclear Information System (INIS)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date

  18. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  19. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI

  20. Treatment of Berkeley boilers in Studsvik. Project description and experiences - Berkeley Boilers Project

    International Nuclear Information System (INIS)

    Saul, Dave; Davidson, Gavin; Wirendal, Bo

    2014-01-01

    In November 2011 Studsvik was awarded a contract to transport five decommissioned boilers from the Berkeley Nuclear Licensed Site in the UK to the Studsvik Nuclear Site in Sweden for metal treatment and recycling. A key objective of the project was to remove the boilers from the site by 31 March 2012 and this was successfully achieved with all boilers off site by 22 March and delivered to Studsvik on 6 April. In November 2012 Studsvik was awarded a further contract for the remaining ten Berkeley Boilers with the requirement to remove all boilers from the Berkeley site by 31 March 2013. Again this was successfully achieved ahead of programme with all boilers in Sweden by 1 April 2013. A total of nine boilers have now been processed and all remaining boilers will be completed by end of September 2014. The projects have had many challenges including a very tight timescale and both have been successfully delivered to cost and ahead of the baseline programme. This paper describes the project and the experience gained from treatment of the boilers to date. (authors)

  1. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A. [Los Alamos National Lab., NM (United States); Wells, S. [Univ. of California, Riverside, CA (United States); Bowker, L.; Finnegan, K. [Univ. of Nevada, Las Vegas, NV (United States); Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report.

  2. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A.; Wells, S.; Bowker, L.; Finnegan, K.; Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report

  3. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  4. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  5. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Science.gov (United States)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  6. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  7. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  8. YUCCA MOUNTAIN SITE DESCRIPTION

    International Nuclear Information System (INIS)

    Simmons, A.M.

    2004-01-01

    The ''Yucca Mountain Site Description'' summarizes, in a single document, the current state of knowledge and understanding of the natural system at Yucca Mountain. It describes the geology; geochemistry; past, present, and projected future climate; regional hydrologic system; and flow and transport within the unsaturated and saturated zones at the site. In addition, it discusses factors affecting radionuclide transport, the effect of thermal loading on the natural system, and tectonic hazards. The ''Yucca Mountain Site Description'' is broad in nature. It summarizes investigations carried out as part of the Yucca Mountain Project since 1988, but it also includes work done at the site in earlier years, as well as studies performed by others. The document has been prepared under the Office of Civilian Radioactive Waste Management quality assurance program for the Yucca Mountain Project. Yucca Mountain is located in Nye County in southern Nevada. The site lies in the north-central part of the Basin and Range physiographic province, within the northernmost subprovince commonly referred to as the Great Basin. The basin and range physiography reflects the extensional tectonic regime that has affected the region during the middle and late Cenozoic Era. Yucca Mountain was initially selected for characterization, in part, because of its thick unsaturated zone, its arid to semiarid climate, and the existence of a rock type that would support excavation of stable openings. In 1987, the United States Congress directed that Yucca Mountain be the only site characterized to evaluate its suitability for development of a geologic repository for high-level radioactive waste and spent nuclear fuel

  9. Chew Bahir: A Key Site within the Hominin Sites and Paleolakes Drilling Project, towards a Half Million-Year Climate Record from Southern Ethiopia

    Science.gov (United States)

    Schaebitz, F.; Asrat, A.; Lamb, H. F.; Trauth, M. H.; Foerster, V. E.; Junginger, A.; Raub, T. D.; Gromig, R.; Viehberg, F. A.; Roberts, H. M.; Cohen, A.

    2015-12-01

    Chew Bahir, a saline mudflat today, is one of the five sites in East Africa, drilled within the framework of HSPDP (Hominin Site and Paleolakes Drilling Project). It is also one of the key sites of the Collaborative Research Centre (CRC-806) "Our way to Europe" aiming at the reconstruction of environmental conditions in the source region of modern man (H. sapiens). It is suggested that a changing environment could have triggered the mobility and dispersal of modern man. The oldest known fossils of anatomical modern humans (~195 ka BP) were found in the Omo basin, not more than 90km westwards of our drill site. The deposits in the tectonic basin of Chew Bahir in southern Ethiopia were cored in Nov. 2014 in two boreholes down to 280 m and 260 m below surface respectively. The overlapping long cores (drilled ~20 m apart from each other), were opened, scanned, described and sampled in low resolution in April 2015. The recovered sediments mostly contain green-greyish to light coloured and brown to reddish clays and silty clays, interbedded with some laminated mica-rich sand layers and occurrences of carbonate concretions and nodules, which decrease upcore. Here we will present a first set of results on the composite core, comprising mainly lithology and magnetic susceptibility (MS). Based on known sedimentation rates from pre-studies performed on short cores across the basin, we anticipate the deep drilled cores to cover at least 500 ka BP. Moreover, new insights into the role of post-depositional alteration, especially of clay minerals and zeolites, will be presented as a contribution to an improved understanding of formation processes. The results support the identification of wet and dry climate periods in the past. Those pronounced variations of moisture availability, are thought to have influenced the evolution and mobility of Homo sapiens sapiens.

  10. Site description of the SFR area at Forsmark at completion of the site investigation phase. SDM-PSU Forsmark

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-05-15

    The site descriptive model (SDM) presented in this report is an integrated model for bedrock geology, rock mechanics, bedrock hydrogeology and bedrock hydrogeochemistry of the site investigated in the SFR extension project (PSU). A description of the surface system is also included in the report. However, the surface system is not integrated with the other disciplines as new data regarding the surface system will not be available until after the completion of SDM-PSU. It is noted that SDM-PSU does not include all disciplines handled in SDM-Site Forsmark (SKB 2008b), the focus is to produce a site description that meets the needs of the SFR extension project. The overall objective of the SFR extension project is to have the application for the extension ready by 2013. This report presents an integrated site model incorporating the historic data acquired from the investigations for and construction of the existing SFR facility (1980-1986), as well as from the recent investigations for the planned extension of SFR (2008-2009). It also provides a summary of the abundant underlying data and the discipline-specific models that support the integrated site model. The description relies heavily on background reports concerning detailed data analyses and modelling in the different disciplines. It is noteworthy that the investigations conducted during the SFR extension project were guided by the choice of site prior to the investigations, which was based on the experience gained during the construction of the existing SFR facility.

  11. Site description of the SFR area at Forsmark at completion of the site investigation phase. SDM-PSU Forsmark

    International Nuclear Information System (INIS)

    2013-05-01

    The site descriptive model (SDM) presented in this report is an integrated model for bedrock geology, rock mechanics, bedrock hydrogeology and bedrock hydrogeochemistry of the site investigated in the SFR extension project (PSU). A description of the surface system is also included in the report. However, the surface system is not integrated with the other disciplines as new data regarding the surface system will not be available until after the completion of SDM-PSU. It is noted that SDM-PSU does not include all disciplines handled in SDM-Site Forsmark (SKB 2008b), the focus is to produce a site description that meets the needs of the SFR extension project. The overall objective of the SFR extension project is to have the application for the extension ready by 2013. This report presents an integrated site model incorporating the historic data acquired from the investigations for and construction of the existing SFR facility (1980-1986), as well as from the recent investigations for the planned extension of SFR (2008-2009). It also provides a summary of the abundant underlying data and the discipline-specific models that support the integrated site model. The description relies heavily on background reports concerning detailed data analyses and modelling in the different disciplines. It is noteworthy that the investigations conducted during the SFR extension project were guided by the choice of site prior to the investigations, which was based on the experience gained during the construction of the existing SFR facility

  12. Ames expedited site characterization demonstration at the former manufactured gas plant site, Marshalltown, Iowa

    International Nuclear Information System (INIS)

    Bevolo, A.J.; Kjartanson, B.H.; Wonder, J.D.

    1996-03-01

    The goal of the Ames Expedited Site Characterization (ESC) project is to evaluate and promote both innovative technologies (IT) and state-of-the-practice technologies (SOPT) for site characterization and monitoring. In April and May 1994, the ESC project conducted site characterization, technology comparison, and stakeholder demonstration activities at a former manufactured gas plant (FMGP) owned by Iowa Electric Services (IES) Utilities, Inc., in Marshalltown, Iowa. Three areas of technology were fielded at the Marshalltown FMGP site: geophysical, analytical and data integration. The geophysical technologies are designed to assess the subsurface geological conditions so that the location, fate and transport of the target contaminants may be assessed and forecasted. The analytical technologies/methods are designed to detect and quantify the target contaminants. The data integration technology area consists of hardware and software systems designed to integrate all the site information compiled and collected into a conceptual site model on a daily basis at the site; this conceptual model then becomes the decision-support tool. Simultaneous fielding of different methods within each of the three areas of technology provided data for direct comparison of the technologies fielded, both SOPT and IT. This document reports the results of the site characterization, technology comparison, and ESC demonstration activities associated with the Marshalltown FMGP site. 124 figs., 27 tabs

  13. Fermilab History and Archives Project | Home

    Science.gov (United States)

    Special Events Early Users Meetings (1979 - 1989) The Tevatron Natural History Discoveries Technology Site Fermilab History and Archives Project Fermilab History and Archives Project Fermi National Accelerator Laboratory Home About the Archives History & Archives Online Request Contact Us Site Index

  14. A biosphere model for use in the SKI Project SITE-94

    International Nuclear Information System (INIS)

    Barrdahl, R.A.G.

    1995-04-01

    A simple biosphere model has been designed for use in the SKI Project SITE-94 related to a hypothetical repository for spent nuclear fuel on the island of Aespoe near Oskarshamn in southern Sweden. The model provides results in terms of radiation dose per Bq/y, unless otherwise indicated, and results will thus have to be scaled with actual flux of radionuclides per year entering the primary biosphere recipients. The model does not include radioactive decay as there is assumed no delay in the model system, except for where explicitly mentioned. Specifically, no radioactive transitions resulting in daughter nuclides are considered. Calculated yearly individual and population committed (50 years) radiation doses to man are expressed in terms of Sv/y and radiation dose rates to fish are expressed as mSv/h. Calculated radiation doses resulting from the present biosphere model are hypothetical, and should under no circumstances be considered as real. Neither should they be used as quantitative information for decision purposes. The biosphere model is of a rough and primitive character and its precision, relative to the real biosphere in the surroundings of Aespoe is envisaged to be several orders of magnitude

  15. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    International Nuclear Information System (INIS)

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-01-01

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely

  16. Usability Testing in a Library Web Site Redesign Project.

    Science.gov (United States)

    McMullen, Susan

    2001-01-01

    Discusses the need for an intuitive library information gateway to meet users' information needs and describes the process involved in redesigning a library Web site based on experiences at Roger Williams University. Explains usability testing methods that were used to discover how users were interacting with the Web site interface. (Author/LRW)

  17. Web Site Optimisation

    OpenAIRE

    Petrželka, Jiří

    2007-01-01

    This BSc Project was performed during a study stay at the Coventry University, UK. The goal of this project is to enhance the accessibility and usability of an existing company presentation located at http://www.hcc.cz, boost the site's traffic and so increase the company's revenues. The project follows these steps to accomplish this: a ) A partial refactoring of the back-end (PHP scripts). b ) Transformation of the website contents according to the recommendations of the World Wide Web conso...

  18. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  19. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  20. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  1. Prediction of seismic motion from contained and excavation nuclear detonations

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, R A [Environmental Research Corp., Alexandria, VA (United States)

    1970-05-15

    Capability to predict ground motions from nuclear events is developed on empirical and theoretical bases. Analyses of the experimental data provide basic predictions of peak particle motions and spectra which follow a (yield){sup m} times (distance){sup -n} relationship. The exponents on yield and distance are frequency dependent and derived from experiment and theory. Theory provides a physical understanding of the phenomena which allows extrapolation to off-NTS and atypical events. For example, yield scaling theory predicts significantly higher frequency motions and consequently larger ground accelerations for overburied events such as Gasbuggy, Rulison, Wasp and Wagon Wheel. These conclusions are observed from Gasbuggy (26 kt) which generated ground accelerations comparable to a normal buried event of 200 kt. This result is important in avoiding personal injury and assessing the probability of property damage. Conversely, theory predicts lower ground accelerations and seismic efficiencies for excavation events; these effects are observed from the Cabriolet and Schooner events and consequently predicted for the Sturtevant and Yawl events. With regard to the distance exponent, scattering theory determines a distance exponent which predicts greater attenuation effects on higher frequency motions. This trend is verified experimentally by regression analyses on a large number of data points which determine the distance exponent to range from -1.1 at low frequencies to -1.6 at high frequencies. Results indicate that cube root similarity scaling is not appropriate in the far field except possibly for peak particle displacements at the low frequency end of the spectrum. In addition to the source and transmission factors, current ground motion prediction techniques, on and off-NTS, take into account local site characteristics. Experimental evidence and theoretical models--layered media elastic theory, finite element modeling, and building response modeling

  2. Temelin 3,4 Siting

    International Nuclear Information System (INIS)

    Kubanova, Iva; Fuzer, Jiri

    2011-01-01

    In the future the Czech Republic will need new energetic resources in spite of current decrease of electricity consumption due to economical crisis. Nuclear power generation is considered as important part of energetic mix of the Czech Republic and this opinion is newly reflected in new government official statement issued in August 2010. CEZ, a. s. prepares new nuclear power plants projects accordingly governmental expectations. Currently 3 projects are in preparation. Temelin 3, 4 project is in the most advanced status, tender is in progress. Potential construction of Dukovany unit 5 and new Jaslovske Bohunice units are analyzed in feasibility studies. Temelin 3, 4 project activities were started 4 years ago. Preparatory analyses, market investigation, feasibility study including many particular studies were elaborated in years 2006-2008. Later on decision to work on bid invitation specification was done and followed. EIA process was started in July 2008 by Intention Announcement and continues. Public tender for EPC contract was announced in August 2009 and it is in progress accordingly schedule. Siting process is in the initial stage. EIA process started in July 2008 through Intention Announcement in spite of anti - nuclear political climate in the Czech Republic. EIA process is interstate process, Austria and Germany participate. Investigation Process Protocol was issued by Ministry of Environment in February 2009 with 34 main conditions and 165 additional comments, requirements, statements. CEZ, a. s. adopted the positive approach with philosophy to deal with all conditions and requirements properly. Elaboration of EIA documentation took 18 months. In May 2010 CEZ, a. s. handed over the EIA documentation to the Ministry of Environment and consequently all legal steps followed including hand-over of EIA documentation to Austria and Germany. In next weeks and months all comments will be gathered by Ministry of Environment and relevant decisions and legal steps

  3. An international research project on Armenian archaeological sites: fission-track dating of obsidians

    Energy Technology Data Exchange (ETDEWEB)

    Badalian, R.; Bigazzi, G. E-mail: g.bigazzi@iggi.pi.cnr.it; Cauvin, M.-C.; Chataigner, C.; Jrbashyan, R.; Karapetyan, S.G.; Oddone, M.; Poidevin, J.-L

    2001-06-01

    In the Mediterranean and adjacent regions, the Caucasus is one of the less studied areas in relation to provenance studies of prehistoric obsidian artefacts. In the frame of an international INTAS research project, an extensive surveying and sampling campaign was carried out in the numerous obsidian bearing volcanic complexes of Armenia. 33 obsidian samples were analysed using the fission-track dating method in order to characterise the potential sources of the numerous artefacts found in prehistoric sites. Ages cluster into five groups--Upper Neopleistocene Q{sub III}, Middle Neopleistocene Q{sub II}, Lower Neopleistocene Q{sub I}, Lower Eopleistocene Q{sub EI} and Lower Pliocene N{sub 3}{sup 1} groups. This research represents a significant contribution to a better knowledge of chronology of Armenian volcanism for which only few data were available. The resulting data-set appears to be a solid base for future provenance studies.

  4. Site study plan for Playa investigations, Deaf Smith County, Texas: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    This plan defines the purpose and objectives of the Playa Investigation Study, presents a plan of work to provide the information necessary to resolve issues, and discusses the rationale for test method selection. The required information will be obtained from existing well drilling records, describing and testing of soil and rock samples recovered from project test holes, geophysical well logs, seismic surveys, and shallow test pits excavated at ground surface. There have been numerous, often conflicting, theories presented to explain the origin(s) of the playas of the Texas High Plains. The primary purpose of this study is to establish if existing playas and playa alignments are related to deeper subsurface structure, such as faulting or salt dissolution, the potential for future playa development, and the significance of existing and/or future playas on siting a repository in Deaf Smith County, Texas. 11 refs

  5. Participation of concerned citizens in site selection decisions

    International Nuclear Information System (INIS)

    Appel, D.

    2003-01-01

    The contribution presents preliminary results of two international projects aimed at integrating the general public, or parts thereof, in the decision process of selecting ultimate storage sites. The author participated in these projects and is a former member of the task group for selection of ultimate storage sites (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd). The two projects are: Forum on Stakeholder Confidence (FSC) of the Nuclear Energy Agency (NEA) OECD, Project 'COWAM' (Community Waste Management) of the European Commission. The participants, goals and methods of the two projects were different, but they both presented concrete methods of selecting ultimate storage sites from the view of different actors in the form of case studies. The focus was on the participation of the public and its importance for success. Apart from meeting technical requirements the selection process should also take account of the requirements of democracy and citizens' participation in order to gain wide acceptance for its results. Deficiencies and advantages of the proposed selection processes are analyzed, and general requirements on the decision process in site selection are derived. (orig.) [de

  6. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  7. YUCCA MOUNTAIN SITE DESCRIPTION

    Energy Technology Data Exchange (ETDEWEB)

    A.M. Simmons

    2004-04-16

    The ''Yucca Mountain Site Description'' summarizes, in a single document, the current state of knowledge and understanding of the natural system at Yucca Mountain. It describes the geology; geochemistry; past, present, and projected future climate; regional hydrologic system; and flow and transport within the unsaturated and saturated zones at the site. In addition, it discusses factors affecting radionuclide transport, the effect of thermal loading on the natural system, and tectonic hazards. The ''Yucca Mountain Site Description'' is broad in nature. It summarizes investigations carried out as part of the Yucca Mountain Project since 1988, but it also includes work done at the site in earlier years, as well as studies performed by others. The document has been prepared under the Office of Civilian Radioactive Waste Management quality assurance program for the Yucca Mountain Project. Yucca Mountain is located in Nye County in southern Nevada. The site lies in the north-central part of the Basin and Range physiographic province, within the northernmost subprovince commonly referred to as the Great Basin. The basin and range physiography reflects the extensional tectonic regime that has affected the region during the middle and late Cenozoic Era. Yucca Mountain was initially selected for characterization, in part, because of its thick unsaturated zone, its arid to semiarid climate, and the existence of a rock type that would support excavation of stable openings. In 1987, the United States Congress directed that Yucca Mountain be the only site characterized to evaluate its suitability for development of a geologic repository for high-level radioactive waste and spent nuclear fuel.

  8. SWEIS Yearbook-2012 Comparison of 2012 Data to Projections of the 2008 Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Mahowald, Hallie B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wright, Marjorie Alys [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-01-16

    Los Alamos National Laboratory (LANL or the Laboratory) operations data for Calendar Year (CY) 2012 mostly fell within the 2008 Site-Wide Environmental Impact Statement (SWEIS) projections. Operation levels for one LANL facility exceeded the 2008 SWEIS capability projections—Radiochemistry Facility; however, none of the capability increases caused exceedances in radioactive air emissions, waste generation, or National Pollutant Discharge Elimination System (NPDES) discharge. Several facilities exceeded the2008 SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for all waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 27 million gallons in CY 2012.

  9. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch reg-sign) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch reg-sign and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points

  10. Characterization of materials for a reactive transport model validation experiment: Interim report on the caisson experiment. Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Siegel, M.D.; Cheng, W.C.; Ward, D.B.; Bryan, C.R.

    1995-08-01

    Models used in performance assessment and site characterization activities related to nuclear waste disposal rely on simplified representations of solute/rock interactions, hydrologic flow field and the material properties of the rock layers surrounding the repository. A crucial element in the design of these models is the validity of these simplifying assumptions. An intermediate-scale experiment is being carried out at the Experimental Engineered Test Facility at Los Alamos Laboratory by the Los Alamos and Sandia National Laboratories to develop a strategy to validate key geochemical and hydrological assumptions in performance assessment models used by the Yucca Mountain Site Characterization Project

  11. Characterization of materials for a reactive transport model validation experiment: Interim report on the caisson experiment. Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Siegel, M.D.; Cheng, W.C. [Sandia National Labs., Albuquerque, NM (United States); Ward, D.B.; Bryan, C.R. [Univ. of New Mexico, Albuquerque, NM (United States). Dept. of Earth and Planetary Sciences

    1995-08-01

    Models used in performance assessment and site characterization activities related to nuclear waste disposal rely on simplified representations of solute/rock interactions, hydrologic flow field and the material properties of the rock layers surrounding the repository. A crucial element in the design of these models is the validity of these simplifying assumptions. An intermediate-scale experiment is being carried out at the Experimental Engineered Test Facility at Los Alamos Laboratory by the Los Alamos and Sandia National Laboratories to develop a strategy to validate key geochemical and hydrological assumptions in performance assessment models used by the Yucca Mountain Site Characterization Project.

  12. Site characterization report for the basalt waste isolation project. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.

  13. Site characterization report for the basalt waste isolation project. Volume II

    International Nuclear Information System (INIS)

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987, and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment

  14. Missouri Department of Natural Resources Hazardous Waste Program Weldon Spring site remedial action project. Status to date January 1998

    International Nuclear Information System (INIS)

    1998-01-01

    This document describes the progress made by the Missouri Department of Natural Resources (MDNR) during the fifth year (1997) of the Agreement in Support (AIS) in its oversight role of the Weldon Springs Site Remedial Action Project (WSSRAP). Staffing issues this year have been a challenge with the resignation of an Environmental Specialist (ES) in June 1997, and the death of Robert Stovall, an Environmental Engineer (EE) II in August 1997. Progress made during this period includes securing a contract laboratory, participation in several workgroup meetings for activities at the site, oversight of the Feasibility Study/Proposed Plan (FS/PP), coordination between the US Department of Energy and the various State regulatory programs and interactions with the local public drinking water supply agency and health departments

  15. Technology application analyses at five Department of Energy Sites

    International Nuclear Information System (INIS)

    1995-05-01

    The Hazardous Waste Remedial Actions Program (HAZWRAP), a division of Lockheed Martin Energy Systems, Inc., managing contractor for the Department of Energy (DOE) facilities in Oak Ridge, Tennessee, was tasked by the United States Air Force (USAF) through an Interagency Agreement between DOE and the USAF, to provide five Technology Application Analysis Reports to the USAF. These reports were to provide information about DOE sites that have volatile organic compounds contaminating soil or ground water and how the sites have been remediated. The sites were using either a pump-and-treat technology or an alternative to pump-and-treat. The USAF was looking at the DOE sites for lessons learned that could be applied to Department of Defense (DoD) problems in an effort to communicate throughout the government system. The five reports were part of a larger project undertaken by the USAF to look at over 30 sites. Many of the sites were DoD sites, but some were in the private sector. The five DOE projects selected to be reviewed came from three sites: the Savannah River Site (SRS), the Kansas City Site, and Lawrence Livermore National Laboratory (LLNL). SRS and LLNL provided two projects each. Both provided a standard pump-and-treat application as well as an innovative technology that is an alternative to pump-and-treat. The five reports on these sites have previously been published separately. This volume combines them to give the reader an overview of the whole project

  16. Restoration of areas disturbed by site studies for a mined commercial radioactive waste repository: The Basalt Waste Isolation Project [BWIP

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.; Biehert, R.W.; Newell, R.L.; Page, T.L.

    1989-01-01

    The Basalt Waste Isolation Project (BWIP) was undertaken to environmentally characterize a portion of the US Department of Energy's Hanford Site in Washington State as a potential host for the nation's first mined commercial nuclear waste repository. Studies were terminated by Congress in 1987. Between 1976 and 1987, 72 areas located across the Hanford Site were disturbed by the BWIP. These areas include borehole pads, a large Exploratory Shaft Facility, and the Near Surface Test Facility. Most boreholes were cleared of vegetation, leveled, and stabilized with a thick layer of compacted pit-run gravel and sand. The Near Surface Test Facility consists of three mined adits, a rock-spoils bench, and numerous support facilities. Restoration began in 1988 with the objective of returning sites to pre-existing conditions using native species. The Hanford Site retains some of the last remnants of the shrub-steppe ecosystem in Washington. The primary constraints to restoring native vegetation at Hanford are low precipitation and the presence of cheatgrass, an extremely capable alien competitor. 5 figs

  17. Hanford Site Infrastructure Plan

    International Nuclear Information System (INIS)

    1990-01-01

    The Hanford Site Infrastructure Plan (HIP) has been prepared as an overview of the facilities, utilities, systems, and services that support all activities on the Hanford Site. Its purpose is three-fold: to examine in detail the existing condition of the Hanford Site's aging utility systems, transportation systems, Site services and general-purpose facilities; to evaluate the ability of these systems to meet present and forecasted Site missions; to identify maintenance and upgrade projects necessary to ensure continued safe and cost-effective support to Hanford Site programs well into the twenty-first century. The HIP is intended to be a dynamic document that will be updated accordingly as Site activities, conditions, and requirements change. 35 figs., 25 tabs

  18. MPL-net at ARM Sites

    Science.gov (United States)

    Spinhirne, J. D.; Welton, E. J.; Campbell, J. R.; Berkoff, T. A.; Starr, David OC. (Technical Monitor)

    2002-01-01

    The NASA MPL-net project goal is consistent data products of the vertical distribution of clouds and aerosol from globally distributed lidar observation sites. The four ARM micro pulse lidars are a basis of the network to consist of over twelve sites. The science objective is ground truth for global satellite retrievals and accurate vertical distribution information in combination with surface radiation measurements for aerosol and cloud models. The project involves improvement in instruments and data processing and cooperation with ARM and other partners.

  19. Cleanup protocols when encountering thorium-230 at U.S. DOE Uranium Mill Tailings Remedial Action (UMTRA) Project sites

    International Nuclear Information System (INIS)

    Miller, M.L.; Hylko, J.M.; Cornish, R.E.

    1995-01-01

    The passage of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, established the regulatory framework, under which the US EPA charged with developing standards for the cleanup and disposal of tailings at 24 designated inactive uranium processing sites located in 10 states. 40 CFR 192.12 requires that the concentration of Ra-226 in land averaged over any area of 100 square meters shall not exceed the background level by more than 5 pCi/g, averaged over the first 15 cm of soil below the surface, 15 pCi/g, averaged over 15-cm-thick layers of soils more than 15 cm below the surface. However, Th-230 is not specifically addressed by the EPA in 40 CFR 192.12, which naturally decays with a half-life of 77,000 years to form Ra-226. Consequently, the cleanup of the initial Ra-226 contamination according to the standards will not necessarily mitigate against the eventual ingrowth of residual Ra-226 with time, due to the radioactive decay of residual Th-230. Therefore, to direct the excavation of residual Th-230, four generic protocols are being used at Uranium Mill Tailings Remedial Action (UMTRA) Project sites, as follows: Determining the allowable remaining concentration of Th-230 in surface and subsurface soils; Encountering Th-230 contamination in the unsaturated subsurface soil; Encountering Th-230 contamination in the saturated zone; and Verification sampling. The four generic protocols, developed in conjunction with the supplemental standards provision, ensure protection of the general public by reducing exposures to levels that are As Low As Reasonably Achievable, while considering practical measures necessary to excavate Th-230 under conditions encountered at the UMTRA Project site

  20. Stimulation sites in the subthalamic nucleus projected onto a mean 3-D atlas of the thalamus and basal ganglia.

    Science.gov (United States)

    Sarnthein, Johannes; Péus, Dominik; Baumann-Vogel, Heide; Baumann, Christian R; Sürücü, Oguzkan

    2013-09-01

    In patients with severe forms of Parkinson's disease (PD), deep brain stimulation (DBS) commonly targets the subthalamic nucleus (STN). Recently, the mean 3-D Morel-Atlas of the basal ganglia and the thalamus was introduced. It combines information contained in histological data from ten post-mortem brains. We were interested whether the Morel-Atlas is applicable for the visualization of stimulation sites. In a consecutive PD patient series, we documented preoperative MRI planning, intraoperative target adjustment based on electrophysiological and neurological testing, and perioperative CT target reconstruction. The localization of the DBS electrodes and the optimal stimulation sites were projected onto the Morel-Atlas. We included 20 patients (median age 62 years). The active contact had mean coordinates Xlat = ±12.1 mm, Yap = -1.8 mm, Zvert = -3.2 mm. There was a significant difference between the initially planned site and the coordinates of the postoperative active contact site (median 2.2 mm). The stimulation site was, on average, more anterior and more dorsal. The electrode contact used for optimal stimulation was found within the STN of the atlas in 38/40 (95 %) of implantations. The cluster of stimulation sites in individual patients-as deduced from preoperative MR, intraoperative electrophysiology and neurological testing-showed a high degree of congruence with the atlas. The mean 3D Morel Atlas is thus a useful tool for postoperative target visualization. This represents the first clinical evaluation of the recently created atlas.

  1. Annual report on the US Department of Energy's cultural resource activities at Colorado UMTRA Project sites for October 1991--September 1992

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the US Department of Energy's (DOE) cultural resource studies that were undertaken in support of the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project in the state of Colorado for the period of October 1, 1991, through September 30, 1992. This report fulfills the DOE's obligation to provide an annual report to the state of Colorado on the status and results of cultural resource studies conducted during the above period of record. This requirement is stated in a programmatic memorandum of agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Previous reports were based on a calendar year reporting period. However, in order to be more consistent with the programmatic memorandum of agreement, the period of record for this and subsequent annual reports has been changed to the Federal fiscal year. The current status and summaries of 1992 cultural resource surveys are provided for all UMTRA Project sites in Colorado. The sites are Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock

  2. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  3. Interim reclamation report: Basalt Waste Isolation Project exploration shaft site

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.; Hefty, M.G.

    1990-02-01

    In 1968, a program was started to assess the feasibility of storing Hanford Site defense waste in deep caverns constructed in basalt. This program was expanded in 1976 to include investigations of the Hanford Site as a potential location for a mined commercial nuclear waste repository. Extensive studies of the geotechnical aspects of the site were undertaken, including preparations for drilling a large diameter Exploratory Shaft. This report describes the development of the reclamation program for the Exploratory Shaft Facility, its implementation, and preliminary estimates of its success. The goal of the reclamation program is to return sites disturbed by the repository program as nearly as practicable to their original conditions using native plant species. 43 refs., 19 figs., 9 tabs

  4. Siting factors for the Swedish deep repository for spent fuel

    International Nuclear Information System (INIS)

    Stroem, A.; Ericsson, Lars O.; Svemar, C.; Almen, K.E.; Andersson, Johan

    1998-01-01

    A project entitled Siting factors and criteria for site evaluation was initiated at the SKB in 1997. The project comprises an important part of the work of siting and site selection that is being pursued within SKB. The purpose of the project is to create a logical structure for the continued siting work, and its results should also be able to be used to assist in evaluating sites. The project will thereby also provide a means - in accordance with the Government's decision regarding Research Programme 95 - to obtain more detailed and quantified siting factors and criteria than those previously presented in the supplement to Research Programme 92. The overall goals of the project are to identify and quantify requirements and preferences regarding the properties of the rock and the soil from the perspectives of long-term safety, performance and planning and design of the rock works, and to identify siting factors and criteria. The latter should be able to be used to determine whether requirements and preferences are satisfied, both when screening sites for site investigation and after completed site investigation. Presented requirements, preferences, factors and criteria must be acceptable to national and municipal authorities or others with influence over the siting work. To start with, requirements and preferences regarding the performance of the rock in a deep repository have been clarified. These requirements and preferences are based on many years of experience of safety assessments and construction analyses within SKB. What is new here is the structuring that has been done, where a classification is made into different geoscientific disciplines, and the formalism that has been developed for the concepts requirements, preferences and performance. This is a prerequisite for a consistent and hopefully comprehensive set of requirements from a functional perspective. Work has continued on siting factors with reference to a coming site investigation programme. A

  5. Feedback from performance assessment to site characterisation. The SITE-94 example

    International Nuclear Information System (INIS)

    Dverstorp, B.; Geier, J.

    1999-01-01

    Interaction and information exchange between site characterisation and performance assessment are key features of any successful radioactive waste management programme. Some examples are presented of the types of feedback that can be offered from performance assessment to site characterisation, based on SKI's most recent performance assessment project, SITE-94. SITE-94 in Sweden was an assessment of a hypothetical repository for spent nuclear fuel, based on real data gathered in the surface-based investigation of the Aespoe Hard Rock Laboratory site. Examples of feedback are given concerning quality control of data and site investigation procedures, identification of key parameters for the performance assessment, use of models for planning and evaluation of a site investigation, data sampling strategies, and guidance on future priorities for further development of site investigation methods. Because site characterisation serves multiple purposes, including provision of data for repository design and construction, it must account for and compromise among requirements from several lines of analyses in the performance assessment. (author)

  6. Environmental restoration of uranium contaminated sites in Estonia within the framework of IAEA project (RER/9/022) in 1995-1996

    International Nuclear Information System (INIS)

    Ratas, R.

    1997-01-01

    In Estonia there are several radioactively contaminated sites left from the military and uranium progressing activities by the former Soviet Union. Enhanced radiation levels are prevalent in the Paldiski area, a former nuclear submarine training centre; on the territory of the waste depository at Saku/Tammiku and at Sillamae, where a large depository of uranium milling tailings is situated. During the last two years considerable effort has been put into restoration of these sites. To start with, designing of reasonably achievable remediation projects have been taken up. Estonia has received large contributions from many western countries and organisations. Practical remediation work on contaminated areas, e.g. at Sillamae is, however, delayed due to lack of funds. (author)

  7. Financing Renewable Energy Projects on Contaminated Lands, Landfills, and Mine Sites

    Science.gov (United States)

    Provides information concerning financing tools and structures, as well as federal financial incentives that may be available for redeveloping potentially contaminated sites, landfills, or mine sites for renewable energy for site owners.

  8. Activities and interim outcomes of a multi-site development project to promote cognitive support technology use and employment success among postsecondary students with traumatic brain injuries.

    Science.gov (United States)

    Hendricks, Deborah J; Sampson, Elaine; Rumrill, Phillip; Leopold, Anne; Elias, Eileen; Jacobs, Karen; Nardone, Amanda; Scherer, Marcia; Stauffer, Callista

    2015-01-01

    This article describes the activities and interim outcomes of a multi-site development project called Project Career, designed to promote cognitive support technology (CST) use and employment success for college and university students with traumatic brain injuries (TBIs). To obtain early intervention results from participants in Project Career's first 18 months of operation. Fifty-six students with TBI have participated to date across three implementation sites in Massachusetts, Ohio, and West Virginia, with 25 of these participants being military veterans. Descriptive analyses provide information regarding the participants, the barriers they face due to their TBI in obtaining a post-secondary education, and the impact services provided by Project Career have had to date in ameliorating those difficulties. Inferential statistical analyses provide preliminary results regarding program effectiveness. Preliminary results indicate the program is encouraging students to use CST strategies in the form of iPads and cognitive enhancement applications (also known as 'apps'). Significant results indicate participants are more positive, independent, and social; participants have a more positive attitude toward technology after six months in the program; and participants reported significantly improved experiences with technology during their first six months in the program. Participating students are actively preparing for their careers after graduation through a wide range of intensive vocational supports provided by project staff members.

  9. Coal refuse reclamation project

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.

    1979-04-06

    A 13.8 ha abandoned coal refuse site in southwestern Illinois was reclaimed by recontouring the refuse material and covering it with a minimum 30 cm of soil. The reclamation procedure included determination of the site's final land use, collection of preconstruction environmental data, and development and implementation of engineering plans. The project is demonstrating methods that can be used to reclaim abandoned coal refuse sites, and a multidisciplinary approach is being used to evaluate postconstruction environmental and economic effects of the reclamation effort. Surface water quality has shown significant improvement and plant cover is becoming established on the site. Soil microbial populations are developing and wildlife habitats are forming. The economic value of the site and adjacent properties has increased substantially and the area's aesthetic value has been enhanced. This project is providing valuable design data for future reclamation efforts of this type.

  10. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  11. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    International Nuclear Information System (INIS)

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  12. The Millennium Villages Project: a retrospective, observational, endline evaluation

    Directory of Open Access Journals (Sweden)

    Shira Mitchell, PhD

    2018-05-01

    Full Text Available Summary: Background: The Millennium Villages Project (MVP was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs. In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. Methods: In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Findings: Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero. Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the

  13. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.; Burningham, A.; Chavez, P.

    1994-03-01

    This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project's quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal

  14. Engineered materials characterization report for the Yucca Mountain Site Characterization Project. Volume 1, Introduction, history, and current candidates

    International Nuclear Information System (INIS)

    Van Konynenburg, R.A.; McCright, R.D.; Roy, A.K.; Jones, D.A.

    1995-08-01

    The purpose of the Yucca Mountain Site Characterization Project is to evaluate Yucca Mountain for its suitability as a potential site for the nation's first high-level nuclear waste repository. As part of this effort, Lawrence Livermore National Laboratory (LLNL) has been occupied for a number of years with developing and evaluating the performance of waste packages for the potential repository. In recent years this work has been carried out under the guidance of and in collaboration with the Management and Operating contractor for the Civilian Radioactive Waste Management System, TRW Environmental Safety Systems, Inc., which in turn reports to the Office of Civilian Radioactive Waste Management of the US Department of Energy. This report summarizes the history of the selection and characterization of materials to be used in the engineered barrier system for the potential repository at Yucca Mountain, describes the current candidate materials, presents a compilation of their properties, and summarizes available corrosion data and modeling. The term ''engineered materials'' is intended to distinguish those materials that are used as part of the engineered barrier system from the natural, geologic materials of the site

  15. Natural phenomena hazards project for Department of Energy sites

    International Nuclear Information System (INIS)

    Coats, D.W.

    1985-01-01

    Lawrence Livermore National Laboratory (LLNL) has developed seismic and wind hazard models for the Office of Nuclear Safety (ONS), Department of Energy (DOE). The work is part of a three-phase effort aimed at establishing uniform building design criteria for seismic and wind hazards at DOE sites throughout the United States. In Phase 1, LLNL gathered information on the sites and their critical facilities, including nuclear reactors, fuel-reprocessing plants, high-level waste storage and treatment facilities, and special nuclear material facilities. In Phase 2, development of seismic and wind hazard models, was initiated. These hazard models express the annual probability that the site will experience an earthquake or wind speed greater than some specified magnitude. In the final phase, it is anticipated that the DOE will use the hazard models to establish uniform criteria for the design and evaluation of critical facilities. 13 references, 2 figures, 1 table

  16. Nanotechnology for Site Remediation: Fact Sheet

    Science.gov (United States)

    This fact sheet presents a snapshot of nanotechnology and its current uses in remediation. It presents information to help site project managers understand the potential applications of this group of technologies at their sites.

  17. India: From SITE to INSAT.

    Science.gov (United States)

    Chaudhri, M. M.

    1986-01-01

    Identifies core of India's illiteracy problem and describes use of educational technology to educate rural children. Highlights include descriptions of the Satellite Instructional Television Experiment (SITE) project; motivation behind low-cost educational aids development in rural areas; an educational radio pilot project; and development and…

  18. Site Selection for Surplus Plutonium Disposition Facilities at the Savannah River Site

    International Nuclear Information System (INIS)

    Wike, L.D.

    2000-01-01

    A site selection study was conducted to evaluate locations for the proposed Surplus Plutonium Disposition Facilities. Facilities to be located include the Mixed Oxide (MOX) Fuel Fabrication Facility, the Pit Disassembly and Conversion Facility (PDCF), and the Plutonium Immobilization Project (PIP) facility. Objectives of the study include: (1) Confirm that the Department of Energy (DOE) selected locations for the MOX and PDCF were suitable based on selected siting criteria, (2) Recommend a site in the vicinity of F Area that is suitable for the PIP, and (3) Identify alternative suitable sites for one or more of these facilities in the event that further geotechnical characterization or other considerations result in disqualification of a currently proposed site

  19. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    International Nuclear Information System (INIS)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository

  20. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    Energy Technology Data Exchange (ETDEWEB)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository.

  1. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  2. Small Reactors without On-site Refuelling: Neutronic Characteristics, Emergency Planning and Development Scenarios. Final Report of an IAEA Coordinated Research Project

    International Nuclear Information System (INIS)

    2010-09-01

    Small reactors without on-site refuelling have a capability to operate without reloading or shuffling of fuel in their cores for reasonably long periods of time consistent with plant economy and considerations of energy security, with no fresh or spent fuel being stored at the site during reactor operation. In 2009, more than 25 design concepts of such reactors were analyzed or developed in IAEA Member States, representing both developed and developing countries. Small reactors without on-site refuelling are being developed for several reactor lines, including water cooled reactors, sodium cooled fast reactors, lead and lead bismuth cooled reactors, and also include some non-conventional concepts. Most of the concepts of small reactors without on-site refuelling reactors are at early design stages. To make such reactors viable, further research and development (R and D) is necessary, inter alia, to validate long-life core operation, define and validate new robust types of fuel, justify an option of plant location in the proximity to its users, and examine possible niches that such reactors could fill in future energy systems. To further research and development (R and D) in the areas mentioned above and several others, and to facilitate progress in Member States in design and technology development for small reactors without on-site refueling, the IAEA has conducted a dedicated Coordinated Research Project (CRP) entitled 'Small Reactors without On-site Refuelling' (CRPi25001). The project started late in 2004 and, after a review in 2008, was extended for one more year to be ended in 2009. The project has created a network of 18 research institutions from 10 Member States, representing both developed and developing countries. Over the CRP period, collaborative results were achieved for many of the abovementioned research areas. Some studies highlighted new directions of research to be furthered after the CRP completion. Some studies remained the efforts of

  3. Risk assessment-led characterisation of the SiteChar UK north sea site for the geological storage of CO2

    International Nuclear Information System (INIS)

    Akhurst, Maxine; Hannis, Sarah D.; Quinn, Martyn F.; Long, David; Shi, Ji-Quan; Koenen, Marielle; Pluymaekers, Maarten; Delprat-Jannaud, Florence; Lecomte, Jean-Claude; Bossie-Codreanu, Daniel; Nagy, Stanislaw; Klimkowski, Lukas; Gei, Davide

    2015-01-01

    Risk assessment-led characterisation of a site for the geological storage of CO 2 in the UK northern North Sea was performed for the EU SiteChar research project as one of a portfolio of sites. Implementation and testing of the SiteChar project site characterisation work-flow has produced a 'dry-run' storage permit application that is compliant with regulatory requirements. A site suitable for commercial-scale storage was characterised, compatible with current and future industrial carbon dioxide (CO 2 ) sources in the northern UK. Pre-characterisation of the site, based on existing information acquired during hydrocarbon exploration and production, has been achieved from publicly available data. The project concept is to store captured CO 2 at a rate of 5 Mt per year for 20 years in the Blake Oil Field and surrounding Captain Sandstone saline aquifer. This commercial-scale storage of 100 Mt CO 2 can be achieved through a storage scenario combining injection of CO 2 into the oil field and concurrent water production down-dip of the field. There would be no encroachment of supercritical phase CO 2 for more than two kilometres beyond the field boundary and no adverse influence on operating hydrocarbon fields provided there is pressure management. Components of a storage permit application for the site are presented, developed as far as possible within a research project. Characterisation and technical investigations were guided by an initial assessment of perceived risks to the prospective site and a need to provide the information required for the storage permit application. The emphasis throughout was to reduce risks and uncertainty on the subsurface containment of stored CO 2 , particularly with respect to site technical performance, monitoring and regulatory issues, and effects on other resources. The results of selected risk assessment-led site characterisation investigations and the subsequent risk reassessments are described together with their

  4. Site selection

    International Nuclear Information System (INIS)

    Olsen, C.W.

    1983-07-01

    The conditions and criteria for selecting a site for a nuclear weapons test at the Nevada Test Site are summarized. Factors considered are: (1) scheduling of drill rigs, (2) scheduling of site preparation (dirt work, auger hole, surface casing, cementing), (3) schedule of event (when are drill hole data needed), (4) depth range of proposed W.P., (5) geologic structure (faults, Pz contact, etc.), (6) stratigraphy (alluvium, location of Grouse Canyon Tuff, etc.), (7) material properties (particularly montmorillonite and CO 2 content), (8) water table depth, (9) potential drilling problems (caving), (10) adjacent collapse craters and chimneys, (11) adjacent expended but uncollapsed sites, (12) adjacent post-shot or other small diameter holes, (13) adjacent stockpile emplacement holes, (14) adjacent planned events (including LANL), (15) projected needs of Test Program for various DOB's and operational separations, and (16) optimal use of NTS real estate

  5. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs.

  6. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    International Nuclear Information System (INIS)

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  7. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  8. Projecting future precipitation and temperature at sites with diverse climate through multiple statistical downscaling schemes

    Science.gov (United States)

    Vallam, P.; Qin, X. S.

    2017-10-01

    Anthropogenic-driven climate change would affect the global ecosystem and is becoming a world-wide concern. Numerous studies have been undertaken to determine the future trends of meteorological variables at different scales. Despite these studies, there remains significant uncertainty in the prediction of future climates. To examine the uncertainty arising from using different schemes to downscale the meteorological variables for the future horizons, projections from different statistical downscaling schemes were examined. These schemes included statistical downscaling method (SDSM), change factor incorporated with LARS-WG, and bias corrected disaggregation (BCD) method. Global circulation models (GCMs) based on CMIP3 (HadCM3) and CMIP5 (CanESM2) were utilized to perturb the changes in the future climate. Five study sites (i.e., Alice Springs, Edmonton, Frankfurt, Miami, and Singapore) with diverse climatic conditions were chosen for examining the spatial variability of applying various statistical downscaling schemes. The study results indicated that the regions experiencing heavy precipitation intensities were most likely to demonstrate the divergence between the predictions from various statistical downscaling methods. Also, the variance computed in projecting the weather extremes indicated the uncertainty derived from selection of downscaling tools and climate models. This study could help gain an improved understanding about the features of different downscaling approaches and the overall downscaling uncertainty.

  9. A West Valley Demonstration Project Milestone - Achieving Certification to Ship Waste to the Nevada Test Site

    International Nuclear Information System (INIS)

    Jackson, J. P.; Pastor, R. S.

    2002-01-01

    The West Valley Demonstration Project (WVDP) has successfully pretreated and vitrified nearly all of the 600,000 gallons of liquid high-level radioactive waste that was generated at the site of the only commercial nuclear fuel reprocessing plant to have operated in the United States. Low-level waste (LLW) generated during the course of the cleanup effort now requires disposal. Currently the WVDP only ships Class A LLW for off-site disposal. It has been shipping Class A wastes to Envirocare of Utah, Inc. since 1997. However, the WVDP may also have a future need to ship Class B and Class C waste, which Envirocare is not currently authorized to accept. The Nevada Test Site (NTS), a U.S. Department of Energy (DOE) facility, can accept all three waste classifications. The WVDP set a goal to receive certification to begin shipping Class A wastes to NTS by 2001. Formal certification/approval was granted by the DOE Nevada Operations Office on July 12, 2001. This paper discusses how the WVDP contractor, West Valley Nuclear Services Company (WVNSCO), completed the activities required to achieve NTS certification in 2001 to ship waste to its facility. The information and lessons learned provided are significant because the WVDP is the only new generator receiving certification based on an NTS audit in January 2001 that resulted in no findings and only two observations--a rating that is unparalleled in the DOE Complex

  10. Projecting the Mental Model of Social Networking Site Usage

    Directory of Open Access Journals (Sweden)

    Chun-Hui Wu

    2018-01-01

    Full Text Available The growth of online social networking sites (SNS has created a new world of connection and communication for online users. SNS usage has become an important part of people’s daily lives. This study aims to obtain new insights towards SNS usage behaviour. Based on participants’ mental models, it is hoped to make more clear exposition about their perceptions and experiences as well as to explore what factors affect their behaviour for using social networking sites. A blend of qualitative methodologies was adopted for data collection and analysis, including the Zaltman metaphor elicitation technique (ZMET method, the laddering technique, and the means-end chain theory. The results of this study show that the most important values of using SNS include its convenience, maintaining relationship, gaining relaxation, as well as reaching coherence. Additionally, participants pointed out they cared about their online privacy issues very much and had found some potential dangers; however, they continued to use these sites because of the great benefits and enjoyment.

  11. Final Report for Project ''Role of Metal Bioavailability in In Situ Bioremediation of Metal and Organic Co-Contaminated Sites''; FINAL

    International Nuclear Information System (INIS)

    Raina M. Maier

    2002-01-01

    A large proportion of hazardous waste sites are co-contaminated with organics and various metals. Such co-contaminated sites are difficult to bioremediate due to the nature of the mixed contaminants. Specifically, the presence of a co-contaminating metal imposes increased stress on indigenous populations already impacted by organic contaminant stress. The overall objective of this research is to investigate the effect of varying metal bioavailability on microbial populations and biodegradation of organics to allow a better understanding of how optimize remediation of co-contaminated sites. The hypothesis for this project is that metal bioavailability is not directly correlated with metal stress imposed on microbial populations that are degrading organics in soil and that further understanding of the relationship between metal bioavailability and metal stress is required for successful treatment of sites contaminated with mixtures of organics and metals. The specific objectives to be addressed to accomplish this goal are: (1) To determine the influence of metal bioavailability in soil microcosms co-contaminated with organics and metals on degradation of the organic contaminants and on mechanisms of metal resistance and (2) To determine the efficacy of different bioremediation strategies for co-contaminated soils based on metal bioavailability

  12. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  13. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  14. An international peer review of the biosphere modelling programme of the US Department of Energy's Yucca mountain site characterization project. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2001-04-01

    The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review

  15. Decommissioning of Malargue site: Engineering solution

    International Nuclear Information System (INIS)

    Liseno, Aldo; Giordano, Nolberto L.

    2000-01-01

    This paper provides a brief comment related with a projected repository to managed tailings of Malargue Plant, located in the city of Malargue (Mendoza province). The approved plan for restoration of Malargue consist of on site relocation of tailings to an engineered repository. The Site is located too close of Malargue city. To isolate tailings from the environment a multilayer system has been projected, in order to keep humidity of residues and multilayer, to avoid migration of contaminant to the environment. (author)

  16. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  17. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  18. The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project

    International Nuclear Information System (INIS)

    Presgrove, S.B.

    1992-01-01

    The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref

  19. Kotka ecopower IGCC-project, the attempt to transfer the biocycle project to Finland

    International Nuclear Information System (INIS)

    Salo, K.

    1998-01-01

    The Danish utilities Elsam and Elkraft planned to build a small (7 MW e ) IGCC-plant in Denmark, called Biocycle Project, based on the gasification and gas clean-up technology of Enviropower Inc. EU/THERMIE program committed to finance part of the investment. The project, however, was not feasible due to the difficulty of finding a suitable customer and sufficient amount of reasonably priced biomass. For this reason a new host and site was found for the Biocycle project. The new site was in Kotka, Finland, where Kotka Energy Ltd., the Energy Board of the City of Kotka acted as the main partner. The fuel of the IGCC project would have been sugar mill wood residue from Xyrofin Inc. During the feasibility investigation (project definition phase) Xyrofin Inc. made the decision to change the production process which eliminated the wood waste production. Without no-cost fuel and due to the low electricity price in Finland the small size IGCC power plant proved not to be feasible. (author)

  20. The Millennium Villages Project: a retrospective, observational, endline evaluation.

    Science.gov (United States)

    Mitchell, Shira; Gelman, Andrew; Ross, Rebecca; Chen, Joyce; Bari, Sehrish; Huynh, Uyen Kim; Harris, Matthew W; Sachs, Sonia Ehrlich; Stuart, Elizabeth A; Feller, Avi; Makela, Susanna; Zaslavsky, Alan M; McClellan, Lucy; Ohemeng-Dapaah, Seth; Namakula, Patricia; Palm, Cheryl A; Sachs, Jeffrey D

    2018-05-01

    The Millennium Villages Project (MVP) was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs). In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero) and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero). Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the project sites. Total on-site spending decreased from US$132