WorldWideScience

Sample records for project evaluation team

  1. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  2. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  3. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  4. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  5. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  6. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  7. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  8. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  9. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  10. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  11. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  12. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  13. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  14. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  15. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  16. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  17. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  18. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  19. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  20. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  1. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  2. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  3. Intellectual Data Analysis Method for Evaluation of Virtual Teams

    Directory of Open Access Journals (Sweden)

    Sandra Strigūnaitė

    2013-01-01

    Full Text Available The purpose of the article is to present a method for virtual team performance evaluation based on intelligent team member collaboration data analysis. The motivation for the research is based on the ability to create an evaluation method that is similar to ambiguous expert evaluations. The concept of the hierarchical fuzzy rule based method aims to evaluate the data from virtual team interaction instances related to implementation of project tasks. The suggested method is designed for project managers or virtual team leaders to help in virtual teamwork evaluation that is based on captured data analysis. The main point of the method is the ability to repeat human thinking and expert valuation process for data analysis by applying fuzzy logic: fuzzy sets, fuzzy signatures and fuzzy rules. The fuzzy set principle used in the method allows evaluation criteria numerical values to transform into linguistic terms and use it in constructing fuzzy rules. Using a fuzzy signature is possible in constructing a hierarchical criteria structure. This structure helps to solve the problem of exponential increase of fuzzy rules including more input variables. The suggested method is aimed to be applied in the virtual collaboration software as a real time teamwork evaluation tool. The research shows that by applying fuzzy logic for team collaboration data analysis it is possible to get evaluations equal to expert insights. The method includes virtual team, project task and team collaboration data analysis. The advantage of the suggested method is the possibility to use variables gained from virtual collaboration systems as fuzzy rules inputs. Information on fuzzy logic based virtual teamwork collaboration evaluation has evidence that can be investigated in the future. Also the method can be seen as the next virtual collaboration software development step.

  4. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  5. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  6. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  7. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  8. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  10. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  11. Assessing and evaluating multidisciplinary translational teams: a mixed methods approach.

    Science.gov (United States)

    Wooten, Kevin C; Rose, Robert M; Ostir, Glenn V; Calhoun, William J; Ameredes, Bill T; Brasier, Allan R

    2014-03-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed-methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed-methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team-type taxonomy. Based on team maturation and scientific progress, teams were designated as (a) early in development, (b) traditional, (c) process focused, or (d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored.

  12. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  13. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  14. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  15. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  16. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  17. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  18. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  19. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  20. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  1. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  2. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  3. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  4. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  5. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  6. Study on team evaluation (4). Reliability and validity of questionnaire survey-based team work evaluation method of power plant operator team

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Hirose, Ayako; Misawa, Ryou; Yamaguchi, Hiroyuki

    2006-01-01

    The series of this study describes the necessity of the evaluation of team work from two aspects of operator's behavior and operators' mind. The authors propose Team Work Element Model which consists of necessary elements to build high performance team. This report discusses a method to evaluate team work from the second aspect, that is, competency trust, competition, for-the team spirit, etc. The authors survey the previous studies on psychological measures and organize a set of questions to evaluate 10 team work sub elements that are the parts of Team Work Element Model. The factor analysis shows that this set of questions is consists of 13 factors such as task-oriented leadership, harmony-oriented team atmosphere, etc. Close examination of the questions in each factor shows that 8 of 10 team work sub elements can be evaluated by this questionnaire. In addition, this questionnaire comprises scales additional 8 scales such as job satisfaction, leadership, etc. As a result, it is possible to evaluate team work from more comprehensive view points. (author)

  7. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  8. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  9. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  10. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  11. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  12. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  13. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  14. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  15. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  16. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  17. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  18. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  19. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  20. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  1. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  2. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  3. Study on dynamic team performance evaluation methodology based on team situation awareness model

    International Nuclear Information System (INIS)

    Kim, Suk Chul

    2005-02-01

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  4. Study on dynamic team performance evaluation methodology based on team situation awareness model

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk Chul

    2005-02-15

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  5. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  6. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  7. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  8. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  9. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  10. Development and evaluation of a decision-based simulation for assessment of team skills.

    Science.gov (United States)

    Andrew, Brandon; Plachta, Stephen; Salud, Lawrence; Pugh, Carla M

    2012-08-01

    There is a need to train and evaluate a wide variety of nontechnical surgical skills. The goal of this project was to develop and evaluate a decision-based simulation to assess team skills. The decision-based exercise used our previously validated Laparoscopic Ventral Hernia simulator and a newly developed team evaluation survey. Five teams of 3 surgical residents (N = 15) were tasked with repairing a 10 × 10-cm right upper quadrant hernia. During the simulation, independent observers (N = 6) completed a 6-item survey assessing: (1) work quality; (2) communication; and (3) team effectiveness. After the simulation, team members self-rated their performance by using the same survey. Survey reliability revealed a Cronbach's alpha of r = .811. Significant differences were found when we compared team members' (T) and observers' (O) ratings for communication (T = 4.33/5.00 vs O = 3.00/5.00, P work quality (T = 4.33/5.00 vs O = 3.33/5.00, P performance on the simulator. Our current and previous work provides strong evidence that nontechnical and team related skills can be assessed without simulating a crisis situation. Copyright © 2012 Mosby, Inc. All rights reserved.

  11. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  12. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  13. Evaluation of team skills for control room crews

    International Nuclear Information System (INIS)

    Gaddy, C.D.; Koontz, J.L.

    1987-01-01

    Although team training has received considerable attention throughout industry, a systematic approach to team skills training has only recently been proposed for control room crews. One important step of the approach to team skills training is evaluation of team skills. This paper describes methods and resources, and program considerations in team skills evaluation. The three areas pertaining to methods and resources are: development of evaluation criteria, preparation of event scenarios, and instructor training and additional resources. The program considerations include sequencing and coordination of team skills evaluation in the context of an overall operator training program

  14. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  15. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  16. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  17. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  18. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  19. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  20. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  1. TEAM ATTITUDE EVALUATION: AN EVALUATION IN HOSPITAL COMMITTEES.

    Science.gov (United States)

    Hekmat, Somayeh Noori; Dehnavieh, Reza; Rahimisadegh, Rohaneh; Kohpeima, Vahid; Jahromi, Jahromi Kohpeima

    2015-12-01

    Patients' health and safety is not only a function of complex treatments and advanced therapeutic technologies but also a function of a degree based on which health care professionals fulfill their duties effectively as a team. The aim of this study was to determine the attitude of hospital committee members about teamwork in Kerman hospitals. This study was conducted in 2014 on 171 members of clinical teams and committees of four educational hospitals in Kerman University of Medical Sciences. To collect data, the standard "team attitude evaluation" questionnaire was used. This questionnaire consisted of five domains which evaluated the team attitude in areas related to the team structure, leadership, situation monitoring, mutual support, and communication in the form of a 5-point Likert type scale. To analyze data, descriptive statistical tests, T-test, ANOVA, and linear regression were used. The average score of team attitude for hospital committee members was 3.9 out of 5. The findings showed that leadership had the highest score among the subscales of team work attitude, while mutual support had the lowest score. We could also observe that responsibility was an important factor in participants' team work attitude (β = -0.184, p = 0.024). Comparing data in different subgroups revealed that employment, marital status, and responsibility were the variables affecting the participants' attitudes in the team structure domain. Marital status played a role in leadership; responsibility had a role in situation monitoring; and work experience played a role in domains of communication and mutual support. Hospital committee members had a positive attitude towards teamwork. Training hospital staff and paying particular attention to key elements of effectiveness in a health care team can have a pivotal role in promoting the team culture.

  2. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  3. Experimental evaluation of the influence of the team members' personalities on the team performance

    International Nuclear Information System (INIS)

    Nagasaka, Akihiko

    1998-01-01

    This report deals with the result of the experiment that testees' teams had coped with abnormal events on power plant simulator. 8 teams were AAA1, AAA2, ACD1, ACD2, CCC1, CCC2, DDD1 and DDD2 consist of 3 members. Members of teams were intentionally united by his personality with the results examined by Yatabe-Guilford personality test (A: Average type, C: Calm type, D: Director type). Each team coped with 8 abnormal events (leak from the pipe after the condensate booster pump-A and feedwater control system failure, vacuum pump-A failure, etc.). Teams' behaviors were evaluated and calculated the evaluated values about 3 team's functions: (1) direction and orientation (11 items), (2) recovery (13 items) and (3) maintenance of cooperation (13 items). The order of the evaluated values were almost AAAs≤ACDs≤CCCs< DDDs with each function. And the results on multiple comparison of the evaluated values are as follows: (a) There are remarkable significances between DDDs and other combinations of personalities (32 cases per 36 cases). (b) Some cases are significant among 2 teams of same combination of personalities (4 cases per 12 cases). Also the results on analysis of utterances of team member are as follows: (c) There is good correspondence of the number of utterances to the evaluated values. (d) With AAAs, the number of 'Instruction' is very small. (e) With CCCs, utterances related to maintenance of cooperation are relatively few. On these results, the author is convinced that combination of personalities in not matured team certainly relates team performance and utterances among the members. (author)

  4. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  5. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  6. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  7. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  8. Study on team evaluation (5). On application of behavior observation-based teamwork evaluation sheet for power plant operator team

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Sugihara, Yoshikuni

    2009-01-01

    This report discusses the range of application of the behavior observation-based teamwork evaluation sheet. Under the concept of this method, teamwork evaluation sheet is developed, which assumes a certain single failure (failure of feed water transmitter). The evaluation sheets are applied to evaluate team work of 26 thermal power plant operator teams in combined under abnormal operating conditions of failure of feed water transmitter, feed draft fan or steam flow governor. As a result of ANOVA, it finds that there are no differences between 3 kinds of single failure. In addition, the similar analysis is executed to 3 kinds of multiple failures (steam generator tube rapture, loss of coolant accident and loss of secondary coolant accident) under which 7 PWR nuclear power plant operator teams are evaluated. As a result, ANOVA shows no differences between 3 kinds of multiple failures. These results indicate that a behavior observation-based team work evaluation sheet, which is designed for a certain abnormal condition, is applicable to the abnormal conditions that have the same development of abnormal conditions. (author)

  9. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  10. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  11. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  12. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  13. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  14. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  15. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  16. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  17. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  18. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  19. Mid-term evaluation of the Climate Change Action Fund: Technology Early Action Measures (TEAM) block

    International Nuclear Information System (INIS)

    2001-11-01

    To assist Canada in meeting its commitments under the Kyoto Protocol for the reduction of greenhouse gas emissions, the Government of Canada established the Climate Change Action Fund (CCAF) in 1998. Under the CCAF umbrella, the Technology Early Action Measures (TEAM) Block was initially allocated 60 million dollars over a three-year period for the provision of cost-shared support to speed up the development and deployment of cost-effective near market-ready greenhouse gases emission reducing technologies. The main avenues adopted by TEAM in its mandate were: supporting technology development and deployment, overcoming obstacles to technology development and deployment, and piloting technology transfer to developing countries and countries in transition. A mid-term evaluation of its performance to date was conducted. It proved to be too early for an adequate assessment of the extent to which the projects sponsored by TEAM demonstrated technical success in reducing greenhouse gases emissions, considering the time-consuming tasks required for the development and negotiation of technology projects. Most projects to date have not moved beyond the early stages benchmark. It was determined that the expected outcomes will be achieved. The innovative approach selected by TEAM, building on existing programs, appeared to be very effective. Findings and recommendations were discussed in this report

  20. Evaluating the effectiveness of health care teams.

    Science.gov (United States)

    Mickan, Sharon M

    2005-05-01

    While it is recognised that effective health care teams are associated with quality patient care, the literature is comparatively sparse in defining the outcomes of effective teamwork. This literature review of the range of organisational, team and individual benefits of teamwork complements an earlier article which summarised the antecedent conditions for (input) and team processes (throughput) of effective teams. This article summarises the evidence for a range of outcome measures of effective teams. Organisational benefits of teamwork include reduced hospitalisation time and costs, reduced unanticipated admissions, better accessibility for patients, and improved coordination of care. Team benefits include efficient use of health care services, enhanced communication and professional diversity. Patients report benefits of enhanced satisfaction, acceptance of treatment and improved health outcomes. Finally, team members report enhanced job satisfaction, greater role clarity and enhanced well-being. Due to the inherent complexity of teamwork, a constituency model of team evaluation is supported where key stakeholders identify and measure the intended benefits of a team.

  1. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  2. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  3. American Fuel Cell Bus Project Evaluation. Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  4. Evaluating the Impact and Determinants of Student Team Performance: Using LMS and CATME Data

    Science.gov (United States)

    Braender, Lynn M.; Naples, Michele I.

    2013-01-01

    Practitioners find it difficult to allocate grades to individual students based on their contributions to the team project. They often use classroom observation of teamwork and student peer evaluations to differentiate an individual's grade from the group's grade, which can be subjective and imprecise. We used objective data from student activity…

  5. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  6. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  7. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  8. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  9. Evaluation of a Team Project Based Learning Module for Developing Employability Skills

    OpenAIRE

    Janice Whatley

    2012-01-01

    This paper presents a case study, in which a new module, aimed at enhancing students’ employ-ability skills, is evaluated. Employability skills for graduates from higher education are regarded as essential outcomes from their degree programmes, but it can be difficult to provide appropriate opportunities to develop these skills in the context of their studies. This paper describes a new module, called Live Projects, designed to provide project based learning on campus, but involv-ing local bu...

  10. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  11. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  12. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  13. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  14. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  15. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  16. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  17. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  18. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  19. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  20. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  1. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  2. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  3. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  4. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  5. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    OpenAIRE

    William R. Doucette; Cailin Lickteig; Stevie Veach; Barry Carter; Barcey Levy

    2014-01-01

    Objectives: 1) Conduct team building activities for provider-community pharmacist teams in small communities and 2) Determine the impact of the team approach on practitioner-reported consequences and 3) Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisio...

  6. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  7. Development and Evaluation of a Home Enteral Nutrition Team

    Directory of Open Access Journals (Sweden)

    Sarah Dinenage

    2015-03-01

    Full Text Available The organisation of services to support the increasing number of people receiving enteral tube feeding (ETF at home varies across regions. There is evidence that multi-disciplinary primary care teams focussed on home enteral nutrition (HEN can provide cost-effective care. This paper describes the development and evaluation of a HEN Team in one UK city. A HEN Team comprising dietetians, nurses and a speech and language therapist was developed with the aim of delivering a quality service for people with gastrostomy tubes living at home. Team objectives were set and an underpinning framework of organisation developed including a care pathway and a schedule of training. Impact on patient outcomes was assessed in a pre-post test evaluation design. Patients and carers reported improved support in managing their ETF. Cost savings were realised through: (1 prevention of hospital admission and related transport for ETF related issues; (2 effective management and reduction of waste of feed and thickener; (3 balloon gastrostomy tube replacement by the HEN Team in the patient’s home, and optimisation of nutritional status. This service evaluation demonstrated that the establishment of a dedicated multi-professional HEN Team focussed on achievement of key objectives improved patient experience and, although calculation of cost savings were estimates, provided evidence of cost-effectiveness.

  8. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  9. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  10. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  11. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  12. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  13. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  14. The use of a rehabilitation team for stroke patients.

    Science.gov (United States)

    Pendarvis, J F; Grinnell, R M

    1980-01-01

    A multidisciplinary team affiliated with a large urban hospital is described and evaluated with respect to its effects on stroke patients. Twenty-six patients who had been referred to the team in a 7-month period were compared with a group of 32 patients who had not been referred to the team. Patients were evaluated on the basis of their scores on a functional health scale mailed to them 3 months after their discharge from the hospital. The results of this project indicate that patients seen by the team scored higher on functional health than those not seen by the team.

  15. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  16. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  17. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  18. Validity of Peer Evaluation for Team-Based Learning in a Dental School in Japan.

    Science.gov (United States)

    Nishigawa, Keisuke; Hayama, Rika; Omoto, Katsuhiro; Okura, Kazuo; Tajima, Toyoko; Suzuki, Yoshitaka; Hosoki, Maki; Ueda, Mayu; Inoue, Miho; Rodis, Omar Marianito Maningo; Matsuka, Yoshizo

    2017-12-01

    The aim of this study was to determine the validity of peer evaluation for team-based learning (TBL) classes in dental education in comparison with the term-end examination records and TBL class scores. Examination and TBL class records of 256 third- and fourth-year dental students in six fixed prosthodontics courses from 2013 to 2015 in one dental school in Japan were investigated. Results of the term-end examination during those courses, individual readiness assurance test (IRAT), group readiness assurance test (GRAT), group assignment projects (GAP), and peer evaluation of group members in TBL classes were collected. Significant positive correlations were found between all combinations of peer evaluation, IRAT, and term-end examination. Individual scores also showed a positive correlation with group score (total of GRAT and GAP). From the investigation of the correlations in the six courses, significant positive correlations between peer evaluation and individual score were found in four of the six courses. In this study, peer evaluation seemed to be a valid index for learning performance in TBL classes. To verify the effectiveness of peer evaluation, all students have to realize the significance of scoring the team member's performance. Clear criteria and detailed instruction for appropriate evaluation are also required.

  19. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  20. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  1. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  2. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  3. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    Science.gov (United States)

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  4. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  5. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  6. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  7. Evaluation of a Pilot Project to Introduce Simulation-Based Team Training to Pediatric Surgery Trauma Room Care

    Directory of Open Access Journals (Sweden)

    Markus Lehner

    2017-01-01

    Full Text Available Introduction. Several studies in pediatric trauma care have demonstrated substantial deficits in both prehospital and emergency department management. Methods. In February 2015 the PAEDSIM collaborative conducted a one and a half day interdisciplinary, simulation based team-training course in a simulated pediatric emergency department. 14 physicians from the medical fields of pediatric surgery, pediatric intensive care and emergency medicine, and anesthesia participated, as well as four pediatric nurses. After a theoretical introduction and familiarization with the simulator, course attendees alternately participated in six simulation scenarios and debriefings. Each scenario incorporated elements of pediatric trauma management as well as Crew Resource Management (CRM educational objectives. Participants completed anonymous pre- and postcourse questionnaires and rated the course itself as well as their own medical qualification and knowledge of CRM. Results. Participants found the course very realistic and selected scenarios highly relevant to their daily work. They reported a feeling of improved medical and nontechnical skills as well as no uncomfortable feeling during scenarios or debriefings. Conclusion. To our knowledge this pilot-project represents the first successful implementation of a simulation-based team-training course focused on pediatric trauma care in German-speaking countries with good acceptance.

  8. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  9. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  10. Evaluating the effect of a reader worker program on team performance

    International Nuclear Information System (INIS)

    Hahn, H.A.; Alvarez, Y.P.

    1994-01-01

    When safety, security, or other logistical concerns prevent direct objective assessment of team performance, other evaluation techniques become necessary. In this paper, the effect of a Department of Energy-mandated reader worker program on team performance at a particular DOE facility was evaluated using unstructured observations, informal discussions with technicians, and human reliability analysis. The reader worker program is intended to enhance nuclear explosive safety by improving the reliability of team performance. The three methods used for the evaluation combine to provide a strong indication that team performance is in fact enhanced by a properly implemented reader worker procedure. Because direct quantitative data on dependent variables particular to the task of interest is not available, however, there has been some skepticism regarding the results by staff at the facility

  11. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  12. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  13. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  14. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  15. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  16. Impacts of dairy diagnostic teams on herd performance.

    Science.gov (United States)

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  17. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  18. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  19. Evaluation of a diabetes nurse specialist prescribing project.

    Science.gov (United States)

    Wilkinson, Jill; Carryer, Jenny; Adams, Jeffery

    2014-08-01

    To evaluate the diabetes nurse specialist prescribing project with the aim of determining whether diabetes nurse specialist prescribing is safe and effective and to inform the implementation and extension of registered nurse prescribing. Registered nurses in many countries are able to prescribe medicines, but in New Zealand, prior to the diabetes nurse specialist project, nurse practitioners were the only nurses who could prescribe medicines. New regulations allowed the nurses to prescribe a limited number of prescription medicines. The study was a process and outcome clinical programme evaluation. The project took place between April-September 2011 and involved 12 diabetes nurse specialist in four localities. Quantitative data were collected from clinical records maintained by the diabetes nurse specialist for the project (1274 patients and 3402 prescribing events), from surveys with stakeholders (general practitioners, n = 30; team members, n = 19; and patients, n = 89) and audits from patient notes (n = 117) and prescriptions (n = 227), and qualitative data from interviews with project participants (n = 18) and patients (n = 19). All data were analysed descriptively. Diabetes nurse specialist prescribing was determined to be safe, of high quality and appropriate. It brought important benefits to the effectiveness of specialist diabetes services, was acceptable to patients and was supported by the wider healthcare team. These findings are consistent with the findings reported in the international literature about nurse prescribing in a range of different practice areas. Clarification of the education and competence requirements and resourcing for the ongoing supervision of nurses is recommended if the prescribing model is to be extended. Diabetes nurse specialist prescribing improved access to medicines by providing a more timely service. Nurses felt more satisfied with their work because they could independently provide a complete episode of care

  20. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  1. Evaluating trauma team performance in a Level I trauma center: Validation of the trauma team communication assessment (TTCA-24).

    Science.gov (United States)

    DeMoor, Stephanie; Abdel-Rehim, Shady; Olmsted, Richard; Myers, John G; Parker-Raley, Jessica

    2017-07-01

    Nontechnical skills (NTS), such as team communication, are well-recognized determinants of trauma team performance and good patient care. Measuring these competencies during trauma resuscitations is essential, yet few valid and reliable tools are available. We aimed to demonstrate that the Trauma Team Communication Assessment (TTCA-24) is a valid and reliable instrument that measures communication effectiveness during activations. Two tools with adequate psychometric strength (Trauma Nontechnical Skills Scale [T-NOTECHS], Team Emergency Assessment Measure [TEAM]) were identified during a systematic review of medical literature and compared with TTCA-24. Three coders used each tool to evaluate 35 stable and 35 unstable patient activations (defined according to Advanced Trauma Life Support criteria). Interrater reliability was calculated between coders using the intraclass correlation coefficient. Spearman rank correlation coefficient was used to establish concurrent validity between TTCA-24 and the other two validated tools. Coders achieved an intraclass correlation coefficient of 0.87 for stable patient activations and 0.78 for unstable activations scoring excellent on the interrater agreement guidelines. The median score for each assessment showed good team communication for all 70 videos (TEAM, 39.8 of 54; T-NOTECHS, 17.4 of 25; and TTCA-24, 87.4 of 96). A significant correlation between TTTC-24 and T-NOTECHS was revealed (p = 0.029), but no significant correlation between TTCA-24 and TEAM (p = 0.77). Team communication was rated slightly better across all assessments for stable versus unstable patient activations, but not statistically significant. TTCA-24 correlated with T-NOTECHS, an instrument measuring nontechnical skills for trauma teams, but not TEAM, a tool that assesses communication in generic emergency settings. TTCA-24 is a reliable and valid assessment that can be a useful adjunct when evaluating interpersonal and team communication during trauma

  2. Systematic evaluation of nuclear operator team skills training

    International Nuclear Information System (INIS)

    Harrington, D.K.; Kello, J.E.

    1991-01-01

    In recent years, the nuclear industry has increasingly recognized with the technical training given its control room operators. As yet, however, little has been done to determine the actual effectiveness of such nontechnical training. Thus, the questions of how team training should be carried out for maximum impact on the safety and efficiency of control room operation and just what the benefits of such training might be remain open. We are in the early stages of establishing a systematic evaluation process that will help nuclear utilities assess the effectiveness of their existing team skills training programs for control room operators. Research focuses on defining the specific behavioral and attitudinal objectives of team skills training. Simply put, what does good practice look like and sound like in the control room environment? What specific behaviors and attitudes should the training be directed toward? Obviously, the answers to the questions have clear implications for the design of nuclear team skills training programs

  3. Interprofessional Health Team Communication About Hospital Discharge: An Implementation Science Evaluation Study.

    Science.gov (United States)

    Bahr, Sarah J; Siclovan, Danielle M; Opper, Kristi; Beiler, Joseph; Bobay, Kathleen L; Weiss, Marianne E

    The Consolidated Framework for Implementation Research guided formative evaluation of the implementation of a redesigned interprofessional team rounding process. The purpose of the redesigned process was to improve health team communication about hospital discharge. Themes emerging from interviews of patients, nurses, and providers revealed the inherent value and positive characteristics of the new process, but also workflow, team hierarchy, and process challenges to successful implementation. The evaluation identified actionable recommendations for modifying the implementation process.

  4. Interprofessional team building in the palliative home care setting: Use of a conceptual framework to inform a pilot evaluation.

    Science.gov (United States)

    Shaw, James; Kearney, Colleen; Glenns, Brenda; McKay, Sandra

    2016-01-01

    Home-based palliative care is increasingly dependent on interprofessional teams to deliver collaborative care that more adequately meets the needs of clients and families. The purpose of this pilot evaluation was to qualitatively explore the views of an interprofessional group of home care providers (occupational therapists, nurses, personal support work supervisors, community care coordinators, and a team coordinator) regarding a pilot project encouraging teamwork in interprofessional palliative home care services. We used qualitative methods, informed by an interprofessional conceptual framework, to analyse participants' accounts and provide recommendations regarding strategies for interprofessional team building in palliative home health care. Findings suggest that encouraging practitioners to share past experiences and foster common goals for palliative care are important elements of team building in interprofessional palliative care. Also, establishing a team leader who emphasises sharing power among team members and addressing the need for mutual emotional support may help to maximise interprofessional teamwork in palliative home care. These findings may be used to develop and test more comprehensive efforts to promote stronger interprofessional teamwork in palliative home health care delivery.

  5. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  6. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  7. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  8. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  9. Project Management in the Universidad de Oriente: Improvement of the Ex-Antes Evaluation

    Directory of Open Access Journals (Sweden)

    Yilian Rodríguez-Clavijo

    2017-06-01

    Full Text Available The objective of this study was to demonstrate the importance of ex-ante evaluation as a tool for the management of science and innovation projects at the Universidad de Oriente. For the theoretical analysis we used the methods analysis - synthesis and historical - logic. In the empirical analysis, participant observation, work with a team of experts and brainstorming were used as techniques and tools. The methodological design of the evaluation was defined according to four aspects established by the Organization for Economic Cooperation and Development: field, purpose, criteria and organization. The results of the application of the methodology are presented to the projects to selected projects; which allowed diagnosing the quality of the projects, the areas with the most deficiencies, as well as the aspects that limit the design of the proposals.

  10. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  11. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  12. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  13. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  14. American Fuel Cell Bus Project Evaluation: Third Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB, which was developed as part of the Federal Transit Administration's (FTA) National Fuel Cell Bus Program, was delivered to SunLine in November 2011 and was put in revenue service in mid-December 2011. Two new AFCBs with an upgraded design were delivered in June/July of 2014 and a third new AFCB was delivered in February 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report covers the performance of the AFCBs from July 2015 through December 2016.

  15. Evaluation of communication characteristics of operating teams in NPPs using SNA technique

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H. J.; Lee, S. W.; Kang, H. G.; Seong, P. H. [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Park, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kang, H. G. [Khalifa Univ. of Science, Abu Dhabi (United Arab Emirates)

    2012-03-15

    Inappropriate communications within operational teams can lead to serious consequences of a system since it can cause lack of exchange of important information to perform the task to secure the safety of the system in nuclear power plants (NPPs). For that reason, we studied the communication characteristics However, existing studies on the communication characteristics seem to have problem since they have characterized team communications from a single perspective. According that, we have developed an evaluation method to characterize team communications using social network techniques which can evaluate them from various perspectives which are group cohesiveness, frequency of communications, degree of hierarchy, and communication contents. In addition, we suggested some kids of specific communication characteristics of operating teams that can reduce the occurrence of inappropriate communications. Eight verbal protocol data which are audio-visual recorded under emergency training sessions by main control room (MCR) operating teams are used. As a result of the study, there was negative relationship between group cohesiveness and the ratio of inappropriate communications. Moreover, some kinds of specific communication contents are related to the ratio of inappropriate communications. Consequently, we can evaluate communications characteristics of operating teams in NPPs and suggest specific characteristics to provide useful insights to prevent inappropriate communications.

  16. Evaluation of communication characteristics of operating teams in NPPs using SNA technique

    International Nuclear Information System (INIS)

    Kim, H. J.; Lee, S. W.; Kang, H. G.; Seong, P. H.; Park, J. K.; Kang, H. G.

    2012-01-01

    Inappropriate communications within operational teams can lead to serious consequences of a system since it can cause lack of exchange of important information to perform the task to secure the safety of the system in nuclear power plants (NPPs). For that reason, we studied the communication characteristics However, existing studies on the communication characteristics seem to have problem since they have characterized team communications from a single perspective. According that, we have developed an evaluation method to characterize team communications using social network techniques which can evaluate them from various perspectives which are group cohesiveness, frequency of communications, degree of hierarchy, and communication contents. In addition, we suggested some kids of specific communication characteristics of operating teams that can reduce the occurrence of inappropriate communications. Eight verbal protocol data which are audio-visual recorded under emergency training sessions by main control room (MCR) operating teams are used. As a result of the study, there was negative relationship between group cohesiveness and the ratio of inappropriate communications. Moreover, some kinds of specific communication contents are related to the ratio of inappropriate communications. Consequently, we can evaluate communications characteristics of operating teams in NPPs and suggest specific characteristics to provide useful insights to prevent inappropriate communications

  17. Team Psychological Safety and Team Learning: A Cultural Perspective

    Science.gov (United States)

    Cauwelier, Peter; Ribière, Vincent M.; Bennet, Alex

    2016-01-01

    Purpose: The purpose of this paper was to evaluate if the concept of team psychological safety, a key driver of team learning and originally studied in the West, can be applied in teams from different national cultures. The model originally validated for teams in the West is applied to teams in Thailand to evaluate its validity, and the views team…

  18. Evaluation of transversal competencies: pilot project in a maths course for first-year business

    OpenAIRE

    Bosch Príncep, Manuela; Morillo, Isabel

    2013-01-01

    The aim of this communication is to describe the results of a pilot project for the assessment of the transversal competency "the capacity for learning and responsibility". This competency is centred on the capacity for the analysis, synthesis, overview, and practical application of newly acquired knowledge. It is proposed by the University of Barcelona in its undergraduate degree courses, through multidisciplinary teaching teams. The goal of the pilot project is to evaluate this competenc...

  19. An Evaluation Method for Team Competencies to Enhance Nuclear Safety Culture

    International Nuclear Information System (INIS)

    Hang, S. M.; Seong, P. H.; Kim, A. R.

    2016-01-01

    Safety culture has received attention in safety-critical industries, including nuclear power plants (NPPs), due to various prominent accidents such as concealment of a Station Blackout (SBO) of Kori NPP unit 1 in 2012, the Sewol ferry accident in 2014, and the Chernobyl accident in 1986. Analysis reports have pointed out that one of the major contributors to the cause of the accidents is ‘the lack of safety culture’. The term, nuclear safety culture, was firstly defined after the Chernobyl accident by the IAEA in INSAG report no. 4, as follows “Safety culture is that assembly of characteristics and attitudes in organizations and individuals which establishes that, as an overriding priority, nuclear plant safety issues receive the attention warranted their significance.” Afterwards, a wide consensus grew among researchers and nuclear-related organizations, that safety culture should be evaluated and managed in a certain manner. Consequently, each nuclear-related organization defined and developed their own safety culture definitions and assessment methods. However, none of these methods provides a way for an individual or a team to enhance the safety culture of an organization. Especially for a team, which is the smallest working unit in NPPs, team members easily overlook their required practices to improve nuclear safety culture. Therefore in this study, we suggested a method to estimate nuclear safety culture of a team, by approaching with the ‘competency’ point of view. The competency is commonly focused on individuals, and defined as, “underlying characteristics of an individual that are causally related to effective or superior performance in a job.” Similar to safety culture, the definition of competency focuses on characteristics and attitudes of individuals. Thus, we defined ‘safety culture competency’ as “underlying characteristics and outward attitudes of individuals that are causally related to a healthy and strong nuclear safety

  20. Intensive care unit nurses' evaluation of simulation used for team training.

    Science.gov (United States)

    Ballangrud, Randi; Hall-Lord, Marie Louise; Hedelin, Birgitta; Persenius, Mona

    2014-07-01

    To implement a simulation-based team training programme and to investigate intensive care nurses' evaluations of simulation used for team training. Simulation-based training is recommended to make health care professionals aware of and understand the importance of teamwork related to patient safety. The study was based on a questionnaire evaluation design. A total of 63 registered nurses were recruited: 53 from seven intensive care units in four hospitals in one hospital trust and 10 from an intensive care postgraduate education programme. After conducting a simulation-based team training programme with two scenarios related to emergency situations in the intensive care, the participants evaluated each simulation activity with regard to: (i) outcome of satisfaction and self-confidence in learning, (ii) implementation of educational practice and (iii) simulation design/development. Intensive care nurses were highly satisfied with their simulation-based learning, and they were mostly in agreement with the statements about self-confidence in learning. They were generally positive in their evaluation of the implementation of the educational practice and the simulation design/development. Significant differences were found with regard to scenario roles, prior simulation experience and area of intensive care practice. The study indicates a positive reception of a simulation-based programme with regard to team training in emergency situations in an intensive care unit. The findings may motivate and facilitate the use of simulation for team training to promote patient safety in intensive care and provide educators with support to develop and improve simulation-based training programmes. © 2013 British Association of Critical Care Nurses.

  1. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition

  2. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  3. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  4. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  5. Learning from Evaluation by Peer Team: A Case Study of a Family Counselling Organization

    Science.gov (United States)

    Muniute-Cobb, Eivina I.; Alfred, Mary V.

    2010-01-01

    This qualitative study explores how employees learn from Team Primacy Concept-based employee evaluation and how they use the feedback in performing their jobs. Team Primacy Concept-based evaluation is a type of multirater evaluation. The distinctive characteristic of such evaluation is its peer feedback component during which the employee's…

  6. Emotional Dissonance and Burnout: The Moderating Role of Team Reflexivity and Re-Evaluation.

    Science.gov (United States)

    Andela, Marie; Truchot, Didier

    2017-08-01

    The aim of the present study was to better understand the relationship between emotional dissonance and burnout by exploring the buffering effects of re-evaluation and team reflexivity. The study was conducted with a sample of 445 nurses and healthcare assistants from a general hospital. Team reflexivity was evaluated with the validation of the French version of the team reflexivity scale (Facchin, Tschan, Gurtner, Cohen, & Dupuis, 2006). Burnout was measured with the MBI General Survey (Schaufeli, Leiter, Maslach, & Jackson, 1996). Emotional dissonance and re-evaluation were measured with the scale developed by Andela, Truchot, & Borteyrou (2015). With reference to Rimé's theoretical model (2009), we suggested that both dimensions of team reflexivity (task and social reflexivity) respond to both psychological necessities induced by dissonance (cognitive clarification and socio-affective necessities). Firstly, results indicated that emotional dissonance was related to burnout. Secondly, regression analysis confirmed the buffering role of re-evaluation and social reflexivity on the emotional exhaustion of emotional dissonance. Overall, results contribute to the literature by highlighting the moderating effect of re-evaluation and team reflexivity in analysing the relationship between emotional dissonance and burnout. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  7. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  8. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  9. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  10. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  11. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  12. How do primary health care teams learn to integrate intimate partner violence (IPV) management? A realist evaluation protocol.

    Science.gov (United States)

    Goicolea, Isabel; Vives-Cases, Carmen; San Sebastian, Miguel; Marchal, Bruno; Kegels, Guy; Hurtig, Anna-Karin

    2013-03-23

    and how team learning is connected with changes in organizational culture and values, and in service delivery. This realist evaluation protocol aims to contribute to this knowledge by conducting this project in a country, Spain, where great endeavours have been made towards the integration of IPV management within the health system.

  13. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shipp, S. S.; Allen, J.; Kring, D. A.

    2012-12-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA's Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA's and NLSI's objective to train the next generation of scientists, CLSE's High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 140 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research. Three instruments have been developed or modified to evaluate the extent to which the High School Lunar Research Projects meets its objectives. These three instruments measure changes in student views of the nature of science, attitudes towards science and science careers, and knowledge of lunar science. Exit surveys for teachers, students, and mentors were also developed to elicit general feedback about the program and its impact. The nature of science

  14. The Climate Impacts Research Consortium: Lessons Learned from the Evaluation of Co-production projects

    Science.gov (United States)

    Sokolovska, I.; Andrepont, J. A.; Lach, D.

    2017-12-01

    The Pacific Northwest Climate Impacts Research Consortium (CIRC) is a climate-science-to-climate-action team funded by the National Oceanic and Atmospheric Administration (NOAA), member of NOAA's Regional Integrated Sciences and Assessments (RISA) program. The internal evaluation of the last 6 years of CIRC's work focused on the co-production of knowledge process. The evaluation was based on CIRC's Reflection and Logic model and used a mixed methods design. During regular monthly meetings in 2014/15, all CIRC PIs reflected on the co-production process and presented their evaluation of the projects they worked on. Additionally, we conducted semi-structured interviews with CIRC participants, purposefully targeting key informants. The Climate Impacts Research Consortium teams also administered surveys to assess participants' experiences of the coproduction process as they were engaging in it. Identifying and cultivating an informant from the local stakeholder group with deep, accessible roots within the target community can lead to better coproduction results than having to build those relationships from naught. Across projects, most participants agreed that the project increased their understanding of their area's hazards and by the end of the project most participants were confident the project would produce useful results for themselves. Finally, most participants intended to share what they had learned from this experience with their colleagues and we found that co-production built capacities necessary for communities to incorporate climate change in discussions even after the end of CIRC's participation. During the projects, the involvement of non-traditional participants along with experts was critical to success and a lot of work and preparation needs to be put into the planning of any co-production meeting to overcome various barriers to communication and build trust.

  15. Using practice development methodology to develop children's centre teams: ideas for the future.

    Science.gov (United States)

    Hemingway, Ann; Cowdell, Fiona

    2009-09-01

    The Children's Centre Programme is a recent development in the UK and brings together multi-agency teams to work with disadvantaged families. Practice development methods enable teams to work together in new ways. Although the term practice development remains relatively poorly defined, its key properties suggest that it embraces engagement, empowerment, evaluation and evolution. This paper introduces the Children's Centre Programme and practice development methods and aims to discuss the relevance of using this method to develop teams in children's centres through considering the findings from an evaluation of a two-year project to develop inter-agency public health teams. The evaluation showed that practice development methods can enable successful team development and showed that through effective facilitation, teams can change their practice to focus on areas of local need. The team came up with their own process to develop a strategy for their locality.

  16. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  17. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  18. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  19. Ergonomic evaluation model of operational room based on team performance

    Directory of Open Access Journals (Sweden)

    YANG Zhiyi

    2017-05-01

    Full Text Available A theoretical calculation model based on the ergonomic evaluation of team performance was proposed in order to carry out the ergonomic evaluation of the layout design schemes of the action station in a multitasking operational room. This model was constructed in order to calculate and compare the theoretical value of team performance in multiple layout schemes by considering such substantial influential factors as frequency of communication, distance, angle, importance, human cognitive characteristics and so on. An experiment was finally conducted to verify the proposed model under the criteria of completion time and accuracy rating. As illustrated by the experiment results,the proposed approach is conductive to the prediction and ergonomic evaluation of the layout design schemes of the action station during early design stages,and provides a new theoretical method for the ergonomic evaluation,selection and optimization design of layout design schemes.

  20. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    Directory of Open Access Journals (Sweden)

    William R. Doucette

    2014-01-01

    Full Text Available Objectives: 1 Conduct team building activities for provider-community pharmacist teams in small communities and 2 Determine the impact of the team approach on practitioner-reported consequences and 3 Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisions included patient identification, practitioner roles, and communications. Most pharmacists conducted blood pressure (BP checks in the pharmacy and assessed the anti-hypertensive medications. If the BP was not at goal, the pharmacist worked with the patient and provider to make improvements. Teams followed their strategies for 3-5 months. Data were collected from pharmacy logs and on-line surveys of team members before and after the team period. Results: Using a multi-case approach, 4 cases were classified as Worked-Well, 5 as Limited-Success, and 2 as No-Team-Care. The Worked-Well teams provided an average of 26.5 BP visits per team, while the Limited-Success teams averaged 6.8 BP visits. The Worked-Well teams established and used a system to support the team approach. The Limited-Success teams either didn't fully establish their team system, or used it sparingly. The No-Team-Care cases did not provide any team care. Conclusions: Factors supporting success were: positive provider-pharmacist relations, established team system, commitment to team care, and patient willingness to participate. While this program had some success, potential improvements were identified: more follow-up after the team building session, additional patient materials, and guidance for practice changes.   Type: Case Study

  1. User evaluation of a GUI for controlling an autonomous persistent surveillance team

    Science.gov (United States)

    Scerri, Paul; Owens, Sean; Sycara, Katia; Lewis, Michael

    2010-04-01

    In future military missions, there will be many sensor assets collecting much important information about the environment. User control over surveillance assets is important to ensure that the specific data collected is appropriate for the current mission. Unfortunately, previous work has shown that individual users cannot effectively control more than about four assets, even if the assets have significant autonomy. In the ACCAST project, we hypothesized that by including autonomous teamwork between the assets and allowing users to interact by describing what the team as a whole and specific sub-teams should do, we could dramatically scale up the number of assets an individual user could effectively control. In this paper, we present the results of an experiment where users controlled up to 30 autonomous assets performing a complex mission. The assets autonomously worked together using sophisticated teamwork and the user could tell sub-teams to execute team oriented plans which described the steps required to achieve a team objective without describing exactly which asset performed which role and without having to specify how the team should handle routine information sharing, communications and failure circumstances. The users, soldiers from Fort Benning, were surprisingly good at managing the assets and were all able to complete the complex mission with extremely low friendly and civilian casualties.

  2. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  3. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  4. Sport fans: evaluating the consistency between implicit and explicit attitudes toward favorite and rival teams.

    Science.gov (United States)

    Wenger, Jay L; Brown, Roderick O

    2014-04-01

    Sport fans often foster very positive attitudes for their favorite teams and less favorable attitudes for opponents. The current research was designed to evaluate the consistency that might exist between implicit and explicit measures of those attitudes. College students (24 women, 16 men) performed a version of the Implicit Association Test related to their favorite and rival teams. Participants also reported their attitudes for these teams explicitly, via self-report instruments. When responding to the IAT, participants' responses were faster when they paired positive words with concepts related to favorite teams and negative words with rival teams, indicating implicit favorability for favorite teams and implicit negativity for rival teams. This pattern of implicit favorability and negativity was consistent with what participants reported explicitly via self-report. The importance of evaluating implicit attitudes and the corresponding consistency with explicit attitudes are discussed.

  5. Structuring Effective Student Teams.

    Science.gov (United States)

    Dickson, Ellen L.

    1997-01-01

    Experience with student teams working on policy analysis projects indicates the need for faculty supervision of teams in the process of addressing complex issues. The problem-solving approach adopted in one policy analysis course is described, including assignments and tasks, issues and sponsors, team dynamics, conflict management, and the…

  6. A root cause analysis project in a medication safety course.

    Science.gov (United States)

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  7. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  8. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2017-10-01

    provision of training is not a major focus of this project, trainees were able to practice trauma management skills as well as leadership skills...SUBJECT TERMS Military healthcare team; Trauma teams; Team training; Teamwork; Adaptive performance; Leadership ; Simulation; Modeling; Bayesian belief...ABBREVIATIONS Healthcare team Trauma Trauma teams Team training Teamwork Adaptability Adaptive performance Leadership Simulation Modeling

  9. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  10. A cluster-randomized controlled study to evaluate a team coaching concept for improving teamwork and patient-centeredness in rehabilitation teams.

    Directory of Open Access Journals (Sweden)

    Mirjam Körner

    Full Text Available Although the relevance of interprofessional teamwork in the delivery of patient-centered care is well known, there is a lack of interventions for improving team interaction in the context of rehabilitation in Germany. The aim of the present study is to evaluate whether a specially developed team coaching concept (TCC could improve both teamwork and patient-centeredness.A multicenter, cluster-randomized controlled intervention study was conducted with both staff and patient questionnaires. Data was collected at ten German rehabilitation clinics (five clusters of different indication fields before (t1 and after (t2 the intervention. Intervention clinics received the TCC, while control clinics did not receive any treatment. Staff questionnaires were used to measure internal participation and other aspects of teamwork, such as team organization, while patient questionnaires assessed patient-centeredness. A multivariate analysis of variance was applied for data analysis.In order to analyze the effect of TCC on internal participation and teamwork, 305 questionnaires were included for t1 and 213 for t2 in the staff survey. In the patient survey, 523 questionnaires were included for t1 and 545 for t2. The TCC improved team organization, willingness to accept responsibility and knowledge integration according to staff, with small effect sizes (univariate: η2=.010-.017, whereas other parameters including internal participation, team leadership and cohesion did not improve due to the intervention. The patient survey did not show any improvements on the assessed dimensions.The TCC improved dimensions that were addressed directly by the approach and were linked to the clinics' needs, such as restructured team meetings and better exchange of information. The TCC can be used to improve team organization, willingness to accept responsibility, and knowledge integration in rehabilitation practice, but some further evaluation is needed to understand contextual

  11. A cluster-randomized controlled study to evaluate a team coaching concept for improving teamwork and patient-centeredness in rehabilitation teams.

    Science.gov (United States)

    Körner, Mirjam; Luzay, Leonie; Plewnia, Anne; Becker, Sonja; Rundel, Manfred; Zimmermann, Linda; Müller, Christian

    2017-01-01

    Although the relevance of interprofessional teamwork in the delivery of patient-centered care is well known, there is a lack of interventions for improving team interaction in the context of rehabilitation in Germany. The aim of the present study is to evaluate whether a specially developed team coaching concept (TCC) could improve both teamwork and patient-centeredness. A multicenter, cluster-randomized controlled intervention study was conducted with both staff and patient questionnaires. Data was collected at ten German rehabilitation clinics (five clusters) of different indication fields before (t1) and after (t2) the intervention. Intervention clinics received the TCC, while control clinics did not receive any treatment. Staff questionnaires were used to measure internal participation and other aspects of teamwork, such as team organization, while patient questionnaires assessed patient-centeredness. A multivariate analysis of variance was applied for data analysis. In order to analyze the effect of TCC on internal participation and teamwork, 305 questionnaires were included for t1 and 213 for t2 in the staff survey. In the patient survey, 523 questionnaires were included for t1 and 545 for t2. The TCC improved team organization, willingness to accept responsibility and knowledge integration according to staff, with small effect sizes (univariate: η2=.010-.017), whereas other parameters including internal participation, team leadership and cohesion did not improve due to the intervention. The patient survey did not show any improvements on the assessed dimensions. The TCC improved dimensions that were addressed directly by the approach and were linked to the clinics' needs, such as restructured team meetings and better exchange of information. The TCC can be used to improve team organization, willingness to accept responsibility, and knowledge integration in rehabilitation practice, but some further evaluation is needed to understand contextual factors and

  12. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  13. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  14. When Teams Go Crazy

    DEFF Research Database (Denmark)

    Kuhrmann, Marco; Münch, Jürgen

    2016-01-01

    Software development consists to a large extend of human-based processes with continuously increasing demands regarding interdisciplinary team work. Understanding the dynamics of software teams can be seen as highly important to successful project execution. Hence, for future project managers......, knowledge about non-technical processes in teams is significant. In this paper, we present a course unit that provides an environment in which students can learn and experience the impact of group dynamics on project performance and quality. The course unit uses the Tuckman model as theoretical framework......, and borrows from controlled experiments to organize and implement its practical parts in which students then experience the effects of, e.g., time pressure, resource bottlenecks, staff turnover, loss of key personnel, and other stress factors. We provide a detailed design of the course unit to allow...

  15. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  16. Performance of Student Software Development Teams: The Influence of Personality and Identifying as Team Members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms…

  17. Broadening participation in Research Experiences for Undergraduates (REU) programs: an evaluation of the team research model for undergraduate research experiences

    Science.gov (United States)

    Berthelote, A. R.; Geraghty Ward, E. M.; Dalbotten, D. M.

    2014-12-01

    The REU site on sustainable land and water resources has a goal of broadening participation in the geosciences by underrepresented groups and particularly Native American students. We are evaluating modifications to the traditional REU model in order to better support these students. First, we review a team research model for REU students, where students are placed on teams and work together in peer groups supported by a team of mentors. Second, the REU takes place in locations that have high populations of Native American students to remove barriers to participation for non-traditional students. Finally, the teams do research on issues related to local concerns with cultural focus. Traditional REU models (1 faculty to 1 student/on campus) have been shown to be effective in supporting student movement into graduate programs but often fail to attract a diverse group of candidates. In addition, they rely for success on the relationship between faculty and student, which can often be undermined by unrealistic expectations on the part of the student about the mentor relationship, and can be exacerbated by cultural misunderstanding, conflicting discourse, or students' personal or family issues. At this REU site, peer mentorship and support plays a large role. Students work together to select their research question, follow the project to completion and present the results. Students from both native and non-native backgrounds learn about the culture of the partner reservations and work on a project that is of immediate local concern. The REU also teaches students protocols for working on Native American lands that support good relations between reservation and University. Analysis of participant data gathered from surveys and interview over the course of our 3-year program indicates that the team approach is successful. Students noted that collaborating with other teams was rewarding and mentors reported positively about their roles in providing guidance for the student

  18. The innovative rehabilitation team: an experiment in team building.

    Science.gov (United States)

    Halstead, L S; Rintala, D H; Kanellos, M; Griffin, B; Higgins, L; Rheinecker, S; Whiteside, W; Healy, J E

    1986-06-01

    This article describes an effort by one rehabilitation team to create innovative approaches to team care in a medical rehabilitation hospital. The major arena for implementing change was the weekly patient rounds. We worked to increase patient involvement, developed a rounds coordinator role, used a structured format, and tried to integrate research findings into team decision making. Other innovations included use of a preadmission questionnaire, a discharge check list, and a rounds evaluation questionnaire. The impact of these changes was evaluated using the Group Environment Scale and by analyzing participation in rounds based on verbatim transcripts obtained prior to and 20 months after formation of the Innovative Rehabilitation Team (IRT). The results showed decreased participation by medical personnel during rounds, and increased participation by patients. The rounds coordinator role increased participation rates of staff from all disciplines and the group environment improved within the IRT. These data are compared with similar evaluations made of two other groups, which served as control teams. The problems inherent in making effective, lasting changes in interdisciplinary rehabilitation teams are reviewed, and a plea is made for other teams to explore additional ways to use the collective creativity and resources latent in the team membership.

  19. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  20. FMEA team performance in health care: A qualitative analysis of team member perceptions.

    Science.gov (United States)

    Wetterneck, Tosha B; Hundt, Ann Schoofs; Carayon, Pascale

    2009-06-01

    : Failure mode and effects analysis (FMEA) is a commonly used prospective risk assessment approach in health care. Failure mode and effects analyses are time consuming and resource intensive, and team performance is crucial for FMEA success. We evaluate FMEA team members' perceptions of FMEA team performance to provide recommendations to improve the FMEA process in health care organizations. : Structured interviews and survey questionnaires were administered to team members of 2 FMEA teams at a Midwest Hospital to evaluate team member perceptions of FMEA team performance and factors influencing team performance. Interview transcripts underwent content analysis, and descriptive statistics were performed on questionnaire results to identify and quantify FMEA team performance. Theme-based nodes were categorized using the input-process-outcome model for team performance. : Twenty-eight interviews and questionnaires were completed by 24 team members. Four persons participated on both teams. There were significant differences between the 2 teams regarding perceptions of team functioning and overall team effectiveness that are explained by difference in team inputs and process (e.g., leadership/facilitation, team objectives, attendance of process owners). : Evaluation of team members' perceptions of team functioning produced useful insights that can be used to model future team functioning. Guidelines for FMEA team success are provided.

  1. Midwifery students' evaluation of team-based academic assignments involving peer-marking.

    Science.gov (United States)

    Parratt, Jenny A; Fahy, Kathleen M; Hastie, Carolyn R

    2014-03-01

    Midwives should be skilled team workers in maternity units and in group practices. Poor teamwork skills are a significant cause of adverse maternity care outcomes. Despite Australian and International regulatory requirements that all midwifery graduates are competent in teamwork, the systematic teaching and assessment of teamwork skills is lacking in higher education. How do midwifery students evaluate participation in team-based academic assignments, which include giving and receiving peer feedback? First and third year Bachelor of Midwifery students who volunteered (24 of 56 students). Participatory Action Research with data collection via anonymous online surveys. There was general agreement that team based assignments; (i) should have peer-marking, (ii) help clarify what is meant by teamwork, (iii) develop communication skills, (iv) promote student-to-student learning. Third year students strongly agreed that teams: (i) are valuable preparation for teamwork in practice, (ii) help meet Australian midwifery competency 8, and (iii) were enjoyable. The majority of third year students agreed with statements that their teams were effectively coordinated and team members shared responsibility for work equally; first year students strongly disagreed with these statements. Students' qualitative comments substantiated and expanded on these findings. The majority of students valued teacher feedback on well-developed drafts of the team's assignment prior to marking. Based on these findings we changed practice and created more clearly structured team-based assignments with specific marking criteria. We are developing supporting lessons to teach specific teamwork skills: together these resources are called "TeamUP". TeamUP should be implemented in all pre-registration Midwifery courses to foster students' teamwork skills and readiness for practice. Copyright © 2013 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  2. Improving motivation and engagement in core engineering courses with student teams

    Science.gov (United States)

    Trenshaw, Kathryn Faye

    Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation

  3. Development of an Evaluation Method for Team Safety Culture Competencies using Social Network Analysis

    International Nuclear Information System (INIS)

    Han, Sang Min; Kim, Ar Ryum; Seong, Poong Hyun

    2016-01-01

    In this study, team safety culture competency of a team was estimated through SNA, as a team safety culture index. To overcome the limit of existing safety culture evaluation methods, the concept of competency and SNA were adopted. To estimate team safety culture competency, we defined the definition, range and goal of team safety culture competencies. Derivation of core team safety culture competencies is performed and its behavioral characteristics were derived for each safety culture competency, from the procedures used in NPPs and existing criteria to assess safety culture. Then observation was chosen as a method to provide the input data for the SNA matrix of team members versus insufficient team safety culture competencies. Then through matrix operation, the matrix was converted into the two meaningful values, which are density of team members and degree centralities of each team safety culture competency. Density of tem members and degree centrality of each team safety culture competency represent the team safety culture index and the priority of team safety culture competency to be improved

  4. Development of an Evaluation Method for Team Safety Culture Competencies using Social Network Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Han, Sang Min; Kim, Ar Ryum; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of)

    2016-05-15

    In this study, team safety culture competency of a team was estimated through SNA, as a team safety culture index. To overcome the limit of existing safety culture evaluation methods, the concept of competency and SNA were adopted. To estimate team safety culture competency, we defined the definition, range and goal of team safety culture competencies. Derivation of core team safety culture competencies is performed and its behavioral characteristics were derived for each safety culture competency, from the procedures used in NPPs and existing criteria to assess safety culture. Then observation was chosen as a method to provide the input data for the SNA matrix of team members versus insufficient team safety culture competencies. Then through matrix operation, the matrix was converted into the two meaningful values, which are density of team members and degree centralities of each team safety culture competency. Density of tem members and degree centrality of each team safety culture competency represent the team safety culture index and the priority of team safety culture competency to be improved.

  5. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  6. Enhancing interdisciplinary climate change work through comprehensive evaluation

    Directory of Open Access Journals (Sweden)

    Jenna Klink

    2017-01-01

    Full Text Available This paper shares the details of an evaluation plan from an interdisciplinary climate change project that developed decision support tools (DSTs for agricultural advisors and farmers. It showcases how evaluation enhanced the project work by providing opportunities for the team to reflect on and use data to improve performance. The plan included both formative and summative approaches, team member interviews to assess team functioning, usability testing of DSTs, outreach and marketing campaign evaluation. Outreach evaluation included surveying those reached, monitoring project website traffic, and tracking and mapping outreach details. Marketing evaluation included pre-testing campaign materials, assessing open and click rates of email campaign, and monitoring associated traffic to website. The Useful to Usable (U2U team was generally high functioning, but team interviews allowed the evaluators and leaders to discern factors that were influencing intended outcomes, respond to needs, assign resources, and catalyze activities that were crucial in shaping the outcomes. Usability testing surfaced issues related to default values and search and help features that were addressed by the team and resulted in improved usability. Outreach evaluation found geographic and methodological gaps that were filled, resulting in more target audiences reached and more effective methods used (e.g., hands-on events. Marketing evaluation allowed for improving contact lists over time and improving campaign messaging before deployment. Evaluators and project leaders working on similar projects may adapt or utilize methods detailed in this paper, along with the recommendations, while designing and implementing improvement-oriented evaluation plans.

  7. Factors Contributing to Research Team Effectiveness: Testing a Model of Team Effectiveness in an Academic Setting

    Science.gov (United States)

    Omar, Zoharah; Ahmad, Aminah

    2014-01-01

    Following the classic systems model of inputs, processes, and outputs, this study examined the influence of three input factors, team climate, work overload, and team leadership, on research project team effectiveness as measured by publication productivity, team member satisfaction, and job frustration. This study also examined the mediating…

  8. A conceptual model to improve performance in virtual teams

    Directory of Open Access Journals (Sweden)

    Shopee Dube

    2016-09-01

    Full Text Available Background: The vast improvement in communication technologies and sophisticated project management tools, methods and techniques has allowed geographically and culturally diverse groups to operate and function in a virtual environment. To succeed in this virtual environment where time and space are becoming increasingly irrelevant, organisations must define new ways of implementing initiatives. This virtual environment phenomenon has brought about the formation of virtual project teams that allow organisations to harness the skills and knowhow of the best resources, irrespective of their location. Objectives: The aim of this article was to investigate performance criteria and develop a conceptual model which can be applied to enhance the success of virtual project teams. There are no clear guidelines of the performance criteria in managing virtual project teams. Method: A qualitative research methodology was used in this article. The purpose of content analysis was to explore the literature to understand the concept of performance in virtual project teams and to summarise the findings of the literature reviewed. Results: The research identified a set of performance criteria for the virtual project teams as follows: leadership, trust, communication, team cooperation, reliability, motivation, comfort and social interaction. These were used to conceptualise the model. Conclusion: The conceptual model can be used in a holistic way to determine the overall performance of the virtual project team, but each factor can be analysed individually to determine the impact on the overall performance. The knowledge of performance criteria for virtual project teams could aid project managers in enhancing the success of these teams and taking a different approach to better manage and coordinate them.

  9. Wahlfach Teamarbeit: Ergebnisse eines Pilotprojektes zur interprofessionellen und interdisziplinären Ausbildung mit formativem Team-OSCE (TOSCE [Teamwork elective: Results of a German pilot project on interprofessional and interdisciplinary education with formative team OSCE

    Directory of Open Access Journals (Sweden)

    Schmidt, Anita

    2010-08-01

    Full Text Available [english] Aims: There is a growing need to implement teamworking in medical education. In reality, interdisciplinary and interprofessional education is often absent. Here we describe a pilot trial developed jointly by the nursing college and the medical faculty in Erlangen (Germany in which nursing students and undergraduate medical students formed interprofessional teams and were confronted with interprofessional cases using simulated patients (SPs and phantoms. The elective was planned using standard curriculum planning instruments and finally evaluated with a novel formative team OSCE (Objective Structured Clinical Evaluation instrument.Methods: During one year, 20 nursing students participated voluntarily in the project and 10 medical students took the course as an elective. Results: The pilot project was first performed with two tutors, one from the medical school and one from the nursing school, as well as one to two SPs. During the second course, there was only one tutor. Overall evaluation of the voluntary students was good, with some elements (acute stroke, factual knowledge, and general organizational problems that needed to be improved. Performance of a four-station team OSCE was feasible, but raters reported problems in assessing individuals and the team at the same time. Interobserver agreement was satisfactory (kappa 0.35.Conclusions: Interdisciplinary and interprofessional education between a nursing school and a medical school is feasible within an elective, but requires substantial personnel resources. Design and performance of a team OSCE is possible. The validity of the test has to be shown on follow-up.[german] Zielsetzung: Das Lernziel „Fähigkeit zur interprofessionellen und interdisziplinären Teamarbeit“ wird sowohl in der aktuellen Approbationsordnung für Ärzte als auch im Krankenpflegegesetz gefordert. In der Realität gibt es in beiden Ausbildungen kaum gemeinsame Lehreinheiten. Wir beschreiben ein Pilotprojekt

  10. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  11. A cluster-randomized controlled study to evaluate a team coaching concept for improving teamwork and patient-centeredness in rehabilitation teams

    OpenAIRE

    K?rner, Mirjam; Luzay, Leonie; Plewnia, Anne; Becker, Sonja; Rundel, Manfred; Zimmermann, Linda; M?ller, Christian

    2017-01-01

    Purpose Although the relevance of interprofessional teamwork in the delivery of patient-centered care is well known, there is a lack of interventions for improving team interaction in the context of rehabilitation in Germany. The aim of the present study is to evaluate whether a specially developed team coaching concept (TCC) could improve both teamwork and patient-centeredness. Method A multicenter, cluster-randomized controlled intervention study was conducted with both staff and patient qu...

  12. Advice networks in teams: the role of transformational leadership and members' core self-evaluations.

    Science.gov (United States)

    Zhang, Zhen; Peterson, Suzanne J

    2011-09-01

    This article examines the team-level factors promoting advice exchange networks in teams. Drawing upon theory and research on transformational leadership, team diversity, and social networks, we hypothesized that transformational leadership positively influences advice network density in teams and that advice network density serves as a mediating mechanism linking transformational leadership to team performance. We further hypothesized a 3-way interaction in which members' mean core self-evaluation (CSE) and diversity in CSE jointly moderate the transformational leadership-advice network density relationship, such that the relationship is positive and stronger for teams with low diversity in CSE and high mean CSE. In addition, we expected that advice network centralization attenuates the positive influence of network density on team performance. Results based on multisource data from 79 business unit management teams showed support for these hypotheses. The results highlight the pivotal role played by transformational leadership and team members' CSEs in enhancing team social networks and, ultimately, team effectiveness. PsycINFO Database Record (c) 2011 APA, all rights reserved

  13. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  14. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  15. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  16. Evaluating multidisciplinary health care teams: taking the crisis out of CRM.

    Science.gov (United States)

    Sutton, Gigi

    2009-08-01

    High-reliability organisations are those, such as within the aviation industry, which operate in complex, hazardous environments and yet despite this are able to balance safety and effectiveness. Crew resource management (CRM) training is used to improve the non-technical skills of aviation crews and other high-reliability teams. To date, CRM within the health sector has been restricted to use with "crisis teams" and "crisis events". The purpose of this discussion paper is to examine the application of CRM to acute, ward-based multidisciplinary health care teams and more broadly to argue for the repositioning of health-based CRM to address effective everyday function, of which "crisis events" form just one part. It is argued that CRM methodology could be applied to evaluate ward-based health care teams and design non-technical skills training to increase their efficacy, promote better patient outcomes, and facilitate a range of positive personal and organisational level outcomes.

  17. Microbial Murders Crime Scene Investigation: An Active Team-Based Learning Project that Enhances Student Enthusiasm and Comprehension of Clinical Microbial Pathogens.

    Science.gov (United States)

    Steel, J Jordan

    2017-01-01

    Microbial disease knowledge is a critical component of microbiology courses and is beneficial for many students' future careers. Microbiology courses traditionally cover core concepts through lectures and labs, but specific instruction on microbial diseases varies greatly depending on the instructor and course. A common project involves students researching and presenting a disease to the class. This method alone is not very effective, and course evaluations have consistently indicated that students felt they lacked adequate disease knowledge; therefore, a more hands-on and interactive disease project was developed called Microbial Murders. For this team-based project, a group of students chooses a pathogen, researches the disease, creates a "mugshot" of the pathogen, and develops a corresponding "crime scene," where a hypothetical patient has died from the microbe. Each group gives a presentation introducing the microbial pathogen, signs/symptoms, treatments, and overall characteristics. The students then visit each other's crime scenes to match the pathogen with the correct crime scene by critically thinking through the clues. This project has shown remarkable success. Surveys indicate that 73% of students thought the project helped them understand the material and 84% said it was worth their time. Student participation, excitement, understanding, and application of microbial disease knowledge have increased and are evident through an increase in course evaluations and in student assessment scores. This project is easy to implement and can be used in a wide variety of biology, microbiology, or health classes for any level (middle school through college).

  18. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  19. Development and validation of a heuristic model for evaluation of the team performance of operators in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Sa Kil; Byun, Seong Nam; Lee, Dhong Hoon

    2011-01-01

    Highlights: → We develop an estimation model for evaluation of the team performance of MCR. → To build the model, we extract team performance factors through reviewing literatures and identifying behavior markers. → We validate that the model is adaptable to the advanced MCR of nuclear power plants. → As a result, we find that the model is a systematic and objective to measure team performance. - Abstract: The global concerns about safety in the digital technology of the main control room (MCR) are growing as domestic and foreign nuclear power plants are developed with computerized control facilities and human-system interfaces. In a narrow space, the digital technology contributes to a control room environment, which can facilitate the acquisition of all the information needed for operation. Thus, although an individual performance of the advanced MCR can be further improved; there is a limit in expecting an improvement in team performance. The team performance depends on organic coherence as a whole team rather than on the knowledge and skill of an individual operator. Moreover, a good team performance improves communication between and within teams in an efficient manner, and then it can be conducive to addressing unsafe conditions. Respecting this, it is important and necessary to develop methodological technology for the evaluation of operators' teamwork or collaboration, thus enhancing operational performance in nuclear power plant at the MCR. The objectives of this research are twofold: to develop a systematic methodology for evaluation of the team performance of MCR operators in consideration of advanced MCR characteristics, and to validate that the methodology is adaptable to the advanced MCR of nuclear power plants. In order to achieve these two objectives, first, team performance factors were extracted through literature reviews and methodological study concerning team performance theories. Second, the team performance factors were identified and

  20. Evaluation of different Project Based Learning designs in an MSc degree

    Directory of Open Access Journals (Sweden)

    Carmen García Berdonés

    2014-03-01

    Full Text Available The design and implementation of different Project Based Learning (PBL approaches are presented in this paper. All of them were carried out in the framework of the MSc degree in Electronic Systems for Smart Environments from the University of Malaga. Four subjects were developed using different values of the three main parameters of PBL: teamwork, self-guided learning and project complexity. During two academic years, several indicators were used to evaluate these experiences: compliance with subject time schedules, scores obtained for the students, interaction of each student in his team and satisfaction of students with the experiences. Our results encourage the use of PBL in bachelor degrees but, at the same time, confirm that PBL implementation is not a trivial task when projects are complex or when a high level of autonomous learning is required from students. Teamwork difficulties have also been found. So, we discuss the need of reaching a minimum level of proficiency in some key competencies before using PBL.

  1. Project evaluation: one framework - four approaches

    DEFF Research Database (Denmark)

    Rode, Anna Le Gerstrøm; Svejvig, Per

    . Introducing a framework that can help structure such evaluations, the aim of this paper is to contribute to project theory and practice by inspiring project researchers and aiding project workers in their efforts to open up the black box of projects and deliver relevant and valuable results......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on projects as well as normative arguments focusing on developing prescriptive knowledge of project management. Despite the need for effective...... project management and research methods that can assess effective project management methodologies, extant literature on evaluation procedures or guidelines on how to evaluate projects and/or project management is scarce. To address this challenge, this paper introduces an evaluation framework consisting...

  2. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  3. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  4. Continued multidisciplinary project-based learning - implementation in health informatics.

    Science.gov (United States)

    Wessel, C; Spreckelsen, C

    2009-01-01

    Problem- and project-based learning are approved methods to train students, graduates and post-graduates in scientific and other professional skills. The students are trained on realistic scenarios in a broader context. For students specializing in health informatics we introduced continued multidisciplinary project-based learning (CM-PBL) at a department of medical informatics. The training approach addresses both students of medicine and students of computer science. The students are full members of an ongoing research project and develop a project-related application or module, or explore or evaluate a sub-project. Two teachers guide and review the students' work. The training on scientific work follows a workflow with defined milestones. The team acts as peer group. By participating in the research team's work the students are trained on professional skills. A research project on a web-based information system on hospitals built the scenario for the realistic context. The research team consisted of up to 14 active members at a time, who were scientists and students of computer science and medicine. The well communicated educational approach and team policy fostered the participation of the students. Formative assessment and evaluation showed a considerable improvement of the students' skills and a high participant satisfaction. Alternative education approaches such as project-based learning empower students to acquire scientific knowledge and professional skills, especially the ability of life-long learning, multidisciplinary team work and social responsibility.

  5. Reliability assessment of a peer evaluation instrument in a team-based learning course

    Directory of Open Access Journals (Sweden)

    Wahawisan J

    2016-03-01

    Full Text Available Objective: To evaluate the reliability of a peer evaluation instrument in a longitudinal team-based learning setting. Methods: Student pharmacists were instructed to evaluate the contributions of their peers. Evaluations were analyzed for the variance of the scores by identifying low, medium, and high scores. Agreement between performance ratings within each group of students was assessed via intra-class correlation coefficient (ICC. Results: We found little variation in the standard deviation (SD based on the score means among the high, medium, and low scores within each group. The lack of variation in SD of results between groups suggests that the peer evaluation instrument produces precise results. The ICC showed strong concordance among raters. Conclusions: Findings suggest that our student peer evaluation instrument provides a reliable method for peer assessment in team-based learning settings.

  6. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  7. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  8. [Team training and assessment in mixed reality-based simulated operating room : Current state of research in the field of simulation in spine surgery exemplified by the ATMEOS project].

    Science.gov (United States)

    Stefan, P; Pfandler, M; Wucherer, P; Habert, S; Fürmetz, J; Weidert, S; Euler, E; Eck, U; Lazarovici, M; Weigl, M; Navab, N

    2018-04-01

    Surgical simulators are being increasingly used as an attractive alternative to clinical training in addition to conventional animal models and human specimens. Typically, surgical simulation technology is designed for the purpose of teaching technical surgical skills (so-called task trainers). Simulator training in surgery is therefore in general limited to the individual training of the surgeon and disregards the participation of the rest of the surgical team. The objective of the project Assessment and Training of Medical Experts based on Objective Standards (ATMEOS) is to develop an immersive simulated operating room environment that enables the training and assessment of multidisciplinary surgical teams under various conditions. Using a mixed reality approach, a synthetic patient model, real surgical instruments and radiation-free virtual X‑ray imaging are combined into a simulation of spinal surgery. In previous research studies, the concept was evaluated in terms of realism, plausibility and immersiveness. In the current research, assessment measurements for technical and non-technical skills are developed and evaluated. The aim is to observe multidisciplinary surgical teams in the simulated operating room during minimally invasive spinal surgery and objectively assess the performance of the individual team members and the entire team. Moreover, the effectiveness of training methods and surgical techniques or success critical factors, e. g. management of crisis situations, can be captured and objectively assessed in the controlled environment.

  9. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  10. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    Science.gov (United States)

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  11. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  12. Gender, ethnicity and teaching evaluations : Evidence from mixed teaching teams

    NARCIS (Netherlands)

    N. Wagner (Natascha); M. Rieger (Matthias); K.J. Voorvelt (Katherine)

    2016-01-01

    textabstractThis paper studies the effect of teacher gender and ethnicity on student evaluations of teaching quality at university. We analyze a unique data-set featuring mixed teaching teams and a diverse, multicultural, multi-ethnic group of students and teachers. Co-teaching allows us to study

  13. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  14. Career Education Evaluation in the State of Missouri

    Science.gov (United States)

    Lady, Robin E.; Wilhelm, Eric

    2010-01-01

    This doctoral team project focused on the state policies and procedures for evaluation of career education programs in Missouri. The project team worked with the Career Education department at the Missouri Department of Elementary and Secondary Education to investigate the current evaluation policies used. It was determined that the Career…

  15. Changes in information behavior in clinical teams after introduction of a clinical librarian service

    Science.gov (United States)

    Urquhart, Christine; Turner, Janet; Durbin, Jane; Ryan, Jean

    2007-01-01

    Objectives: The eighteen-month evaluation of a clinical librarian project (October 2003–March 2005) conducted in North Wales, United Kingdom (UK) assessed the benefits of clinical librarian support to clinical teams, the impact of mediated searching services, and the effectiveness of information skills training, including journal club support. Methods: The evaluation assessed changes in teams' information-seeking behavior and their willingness to delegate searching to a clinical librarian. Baseline (n = 69 responses, 73% response rate) and final questionnaire (n = 57, 77% response rate) surveys were complemented by telephone and face-to-face interviews (n = 33) among 3 sites served. Those attending information skills training sessions (n = 130) completed evaluations at the session and were surveyed 1 month after training (n = 24 questionnaire responses, n = 12 interviews). Results: Health professionals in clinical teams reported that they were more willing to undertake their own searching, but also more willing to delegate some literature searching, than at the start of the project. The extent of change depended on the team and the type of information required. Information skills training was particularly effective when organized around journal clubs. Conclusions: Collaboration with a clinical librarian increased clinician willingness to seek information. Clinical librarian services should leverage structured training opportunities such as journal clubs. PMID:17252062

  16. Impact of a multidisciplinary rehabilitation nutrition team on evaluating sarcopenia, cachexia and practice of rehabilitation nutrition.

    Science.gov (United States)

    Kokura, Yoji; Wakabayashi, Hidetaka; Maeda, Keisuke; Nishioka, Shinta; Nakahara, Saori

    2017-01-01

    To determine whether the presence of a multidisciplinary rehabilitation nutrition team affects sarcopenia and cachexia evaluation and practice of rehabilitation nutrition. A cross-sectional study using online questionnaire among members of the Japanese Association of Rehabilitation Nutrition (JARN) was conducted. Questions were related to sarcopenia and cachexia evaluation and practice of rehabilitation nutrition. 677 (14.7%) questionnaires were analysed. 44.5% reported that their institution employed a rehabilitation nutrition team, 20.2% conducted rehabilitation nutrition rounds and 26.1% conducted rehabilitation nutrition meetings. A total of 51.7%, 69.7%, 69.0% and 17.8% measured muscle mass, muscle strength, physical function and cachexia, respectively. For those with a rehabilitation nutrition team, 63.5%, 80.7%, 82.4% and 22.9% measured muscle mass, muscle strength, physical function and cachexia, respectively, whereas 46.7%, 78.0% and 78.1% of the respondents reported implementation of nutrition planning strategies in consideration of energy accumulation, rehabilitation training in consideration of nutritional status and use of dietary supplements, respectively. Multivariate logistic regression analysis showed that the use of a rehabilitation nutrition team independently affected sarcopenia evaluation and practice of rehabilitation nutrition but not cachexia evaluation. The presence of a multidisciplinary rehabilitation nutrition team increased the frequency of sarcopenia evaluation and practice of rehabilitation nutrition. J. Med. Invest. 64: 140-145, February, 2017.

  17. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  18. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  19. Green shoots of recovery: a realist evaluation of a team to support change in general practice.

    Science.gov (United States)

    Bartlett, Maggie; Basten, Ruth; McKinley, Robert K

    2017-02-08

    A multidisciplinary support team for general practice was established in April 2014 by a local National Health Service (NHS) England management team. This work evaluates the team's effectiveness in supporting and promoting change in its first 2 years, using realist methodology. Primary care in one area of England. Semistructured interviews were conducted with staff from 14 practices, 3 key senior NHS England personnel and 5 members of the support team. Sampling of practice staff was purposive to include representatives from relevant professional groups. The team worked with practices to identify areas for change, construct action plans and implement them. While there was no specified timescale for the team's work with practices, it was tailored to each. In realist evaluations, outcomes are contingent on mechanisms acting in contexts, and both an understanding of how an intervention leads to change in a socially constructed system and the resultant changes are outcomes. The principal positive mechanisms leading to change were the support team's expertise and its relationships with practice staff. The 'external view' provided by the team via its corroborative and normalising effects was an important mechanism for increasing morale in some practice contexts. A powerful negative mechanism was related to perceptions of 'being seen as a failing practice' which included expressions of 'shame'. Outcomes for practices as perceived by their staff were better communication, improvements in patients' access to appointments resulting from better clinical and managerial skill mix, and improvements in workload management. The support team promoted change within practices leading to signs of the 'green shoots of recovery' within the time frame of the evaluation. Such interventions need to be tailored and responsive to practices' needs. The team's expertise and relationships between team members and practice staff are central to success. Published by the BMJ Publishing Group

  20. Gender, ethnicity and teaching evaluations : Evidence from mixed teaching teams

    OpenAIRE

    Wagner, Natascha; Rieger, Matthias; Voorvelt, Katherine

    2016-01-01

    textabstractThis paper studies the effect of teacher gender and ethnicity on student evaluations of teaching quality at university. We analyze a unique data-set featuring mixed teaching teams and a diverse, multicultural, multi-ethnic group of students and teachers. Co-teaching allows us to study the impact of teacher gender and ethnicity on students’ evaluations of teaching exploiting within course variation in an empirical model with course-year fixed effects. We document a negative effect ...

  1. A Measure of Team Resilience: Developing the Resilience at Work Team Scale.

    Science.gov (United States)

    McEwen, Kathryn; Boyd, Carolyn M

    2018-03-01

    This study develops, and initial evaluates, a new measure of team-based resilience for use in research and practice. We conducted preliminary analyses, based on a cross-sectional sample of 344 employees nested within 31 teams. Seven dimensions were identified through exploratory and confirmatory factor analyses. The measure had high reliability and significant discrimination to indicate the presence of a unique team-based aspect of resilience that contributed to higher work engagement and higher self-rated team performance, over and above the effects of individual resilience. Multilevel analyses showed that team, but not individual, resilience predicted self-rated team performance. Practice implications include a need to focus on collective as well as individual behaviors in resilience-building. The measure provides a diagnostic instrument for teams and a scale to evaluate organizational interventions and research the relationship of resilience to other constructs.

  2. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  3. Ranking and evaluating the factors affecting the success of ...

    African Journals Online (AJOL)

    Ranking and evaluating the factors affecting the success of management team in construction projects. ... Journal of Fundamental and Applied Sciences. Journal Home ... The project management team is one of these important factors.

  4. The DLESE Evaluation Toolkit Project

    Science.gov (United States)

    Buhr, S. M.; Barker, L. J.; Marlino, M.

    2002-12-01

    The Evaluation Toolkit and Community project is a new Digital Library for Earth System Education (DLESE) collection designed to raise awareness of project evaluation within the geoscience education community, and to enable principal investigators, teachers, and evaluators to implement project evaluation more readily. This new resource is grounded in the needs of geoscience educators, and will provide a virtual home for a geoscience education evaluation community. The goals of the project are to 1) provide a robust collection of evaluation resources useful for Earth systems educators, 2) establish a forum and community for evaluation dialogue within DLESE, and 3) disseminate the resources through the DLESE infrastructure and through professional society workshops and proceedings. Collaboration and expertise in education, geoscience and evaluation are necessary if we are to conduct the best possible geoscience education. The Toolkit allows users to engage in evaluation at whichever level best suits their needs, get more evaluation professional development if desired, and access the expertise of other segments of the community. To date, a test web site has been built and populated, initial community feedback from the DLESE and broader community is being garnered, and we have begun to heighten awareness of geoscience education evaluation within our community. The web site contains features that allow users to access professional development about evaluation, search and find evaluation resources, submit resources, find or offer evaluation services, sign up for upcoming workshops, take the user survey, and submit calendar items. The evaluation resource matrix currently contains resources that have met our initial review. The resources are currently organized by type; they will become searchable on multiple dimensions of project type, audience, objectives and evaluation resource type as efforts to develop a collection-specific search engine mature. The peer review

  5. Resilient behaviour in innovation teams for better project results

    NARCIS (Netherlands)

    Oeij, P.R.A.

    2017-01-01

    Extenden abstract. Organising in a mindful way is a central aspect to making innovation teams become more resilient and enahnce their chances of innovation success. Such organising, called mindful infrastructure, implies creating the right conditions for teams to excel. Four elements are crucial to

  6. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  7. A pleasure working together? : the effects of dissimilarity in team member conscientiousness on team temporal processes and individual satisfaction

    NARCIS (Netherlands)

    Gevers, J.M.P.; Peeters, M.A.G.

    2009-01-01

    In this study of 43 student project teams, we tested a multi-level mediation model of the relationship between dissimilarity in conscientiousness, team temporal processes, and team member satisfaction. We distinguished between individual-level dissimilarity in conscientiousness (i.e., the distance

  8. Teamwork in perioperative nursing. Understanding team development, effectiveness, evaluation.

    Science.gov (United States)

    Farley, M J

    1991-03-01

    Teams are an essential part of perioperative nursing practice. Nurses who have a knowledge of teamwork and experience in working on teams have a greater understanding of the processes and problems involved as teams develop from new, immature teams to those that are mature and effective. This understanding will assist nurses in helping their teams achieve a higher level of productivity, and members will be more satisfied with team efforts. Team development progresses through several stages. Each stage has certain characteristics and desired outcomes. At each stage, team members and leaders have certain responsibilities. Team growth does not take place automatically and inevitably, but as a consequence of conscious and unconscious efforts of its leader and members to solve problems and satisfy needs. Building and maintaining a team is certainly work, but work that brings a great deal of satisfaction and feelings of pride in accomplishment. According to I Tenzer, RN, MS, teamwork "is not a panacea; it is a viable approach to developing a hospital's most valuable resource--people."

  9. Biomedical engineering education through global engineering teams.

    Science.gov (United States)

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  10. Change champions at the grassroots level: practice innovation using team process.

    Science.gov (United States)

    Scott, J; Rantz, M

    1994-01-01

    A nursing administrative group recognized the critical value of staff participation in the formulation of a restructuring project and guidance throughout the project. Using a team approach, a task force of three staff nurses, two assistant nurse managers, a nurse clinician, a nursing practice specialist, and a representative from nursing administration came together. They were given responsibility for researching and setting the course for restructuring change. A unit-based team including a unit secretary, a nursing attendant, licensed practical nurse (LPN), and six staff nurses was formed from volunteers from the 40-bed medicine unit to develop that unit's plan for restructuring. The unit-based team analyzed patient care needs and staff member roles. They created a new patient care technician role as well as a nurse care coordinator role. The role of the LPN was envisioned as providing technical support. Staffing mix was also determined by the unit-based team. Both the task force and the unit-based team continue to evaluate, troubleshoot, and take every opportunity to sell their vision to solidify it further as the foundation for the future of patient care services at the hospital. The process will soon move forward to a large surgical unit.

  11. Virtual worlds and team training.

    Science.gov (United States)

    Dev, Parvati; Youngblood, Patricia; Heinrichs, W Leroy; Kusumoto, Laura

    2007-06-01

    An important component of all emergency medicine residency programs is managing trauma effectively as a member of an emergency medicine team, but practice on live patients is often impractical and mannequin-based simulators are expensive and require all trainees to be physically present at the same location. This article describes a project to develop and evaluate a computer-based simulator (the Virtual Emergency Department) for distance training in teamwork and leadership in trauma management. The virtual environment provides repeated practice opportunities with life-threatening trauma cases in a safe and reproducible setting.

  12. NASA technology applications team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

  13. Team Sport in the Workplace? A RE-AIM Process Evaluation of ‘Changing the Game’

    OpenAIRE

    Andrew Brinkley; Hilary McDermot; Fehmidah Munir

    2017-01-01

    Background: The workplace is a priority setting to promote health. Team sports can be an effective way to promote both physical and social health. This study evaluated the potential enablers and barriers for outcomes of a workplace team sports intervention programme‘Changing the Game’ (CTG). This study was conducted in a FTSE 100 services organisation. This process evaluation was conducted using the RE-AIM framework. Methods: A mixed methods approach was used. Data were collected from the par...

  14. Incorporating Virtually Immersive Environments as a Collaborative Medium for Virtual Teaming

    Directory of Open Access Journals (Sweden)

    Charles J. Lesko, Jr.

    2012-08-01

    Full Text Available Virtually immersive environments incorporate the use of various computer modelling and simulation techniques enabling geographically dispersed virtual project teams to interact within an artificially projected three-dimensional space online. This study focused on adoption of virtually immersive technologies as a collaborative media to support virtual teaming of both graduate and undergraduate-level project management students. The data and information from this study has implications for educators using virtually immersive environments in the classroom. In this study, we specifically evaluated two key components in this paper: 1 students’ level of trust and; 2 students’ willingness to use the technology, along with their belief about the virtual environment’s ability to extend and improve knowledge sharing in their team work environment. We learned that while students did find the environment a positive add on for working collaboratively, there were students who were neither more nor less likely to use the technology for future collaborative ventures. Most of the students who were not very positive about the environment were “fence sitters” likely indicating needs related to additional training to improve communication skills. Finally, based on the full study results we have provided basic recommendations designed to support team trust building in the system along with interpersonal trust building to facilitate knowledge transfer and better strategic us of the technology.

  15. Multivariate Analysis of Students Perception on Teaching with Client Based and Non-Client Based Team Projects

    Directory of Open Access Journals (Sweden)

    Philip Appiah-Kubi

    2018-05-01

    Full Text Available The classroom experience has evolved from traditional lecture, PowerPoint and whiteboards to a more active environment where students and instructors work together more on hands-on activities to achieve the course objectives. Various names have been given to this pedagogy; experiential learning, project-based learning, active learning, problem-based learning are a handful of names used to describe this evolving pedagogy. The main challenge faced by educators in educating undergraduate students to be independent thinkers and problem solvers, has been the driving force fueling the shift in pedagogy. The skill sets needed to be successful in the workforce has also evolved over the years. Today’s employees are not only expected to demonstrate proficiency in green skills in their field of study, but must also possess soft skills required to be competitive in the industry. Gone are the days where engineers worked in silos applying their green skills to create for the common good. To be productive, employers expect today’s engineer to demonstrate the ability to work in teams, communicate effectively, while applying the technical and analytical know-how needed to achieve a desired goal. To ensure that undergraduate students have these desired skills, most engineering educators have shifted away from the traditional all lecture classes and are applying active learning pedagogies. This research looks into student’s perception on project-based learning with client based and non-client based projects in terms of: the project as a learning device, contribution to research knowledge, motivation to learn, contribution to skills and personal benefits, and their effects on student evaluation of teaching and motivation to learn.

  16. Sustainable assessment of learning experiences based on projects

    Directory of Open Access Journals (Sweden)

    Ignacio TRAVERSO RIBÓN

    2016-05-01

    Full Text Available In a project-based learning experience, the detailed monitoring of the activities in which team members participate can be useful to evaluate their work. Using learning-oriented assessment procedures, supervisors can assess the teamwork abilities with a formative purpose. Evaluation strategies such as self-assessment, peer assessment and co-assessment are often used to make evaluation formative and sustainable. Conducting an assessment strategy is not easy for team members, since they need before to have a reasonable understanding of the evaluation process and criteria. This paper describes a learning-oriented evaluation methodology and an open data framework that can be applied to collaborative project settings. An evaluation rubric and a series of indicators that provide evidences about the developed skills have been elaborated and applied in a small-scale project-based course. Projects were managed and developed with the help of an open source software forge that contains a ticketing tool for planning and tracking of tasks, a version control repository to save the software outcomes, and using a wiki to host text deliverables. The experience provides evidences in favor of using the assessment method and open data framework to make teamwork evaluation more sustainable.

  17. Innovative nuclear thermal propulsion technology evaluation: Results of the NASA/DOE Task Team study

    International Nuclear Information System (INIS)

    Howe, S.; Borowski, S.; Helms, I.; Diaz, N.; Anghaie, S.; Latham, T.

    1991-01-01

    In response to findings from two NASA/DOE nuclear propulsion workshops held in the summer of 1990, six task teams were formed to continue evaluation of various nuclear propulsion concepts. The Task Team on Nuclear Thermal Propulsion (NTP) created the Innovative Concepts Subpanel to evaluate thermal propulsion concepts which did not utilize solid fuel. The Subpanel endeavored to evaluate each of the concepts on a ''level technological playing field,'' and to identify critical technologies, issues, and early proof-of-concept experiments. The concepts included the liquid core fission, the gas core fission, the fission foil reactors, explosively driven systems, fusion, and antimatter. The results of the studies by the panel will be provided. 13 refs., 6 figs., 2 tabs

  18. Implementation of a self-directed work team in a TLD Processing Center

    International Nuclear Information System (INIS)

    Arnwine, A.A.; Bogard, R.S.; Teasley, N.A.; Somers, D.E.; Souleyrette, M.L.

    1994-01-01

    In an effort to maintain productivity with a decreasing work force, the Oak Ridge Y-12 Plant has adopted the concept of Self-Directed Work Teams in various disciplines. The plant's Health Physics Department was able to eliminate a layer of front-line supervisors by establishing four self-directed work teams. Each team was able to choose their method of implementation. The TLD Processing Center Team chose to use project managment tools to ensure a smooth transition from the traditional work group to a self-directed approach. This process focused on establishing responsibilities, determining training requirements, determining a leadership style for the group, and performing a potential problem analysis for the transition. The transition also reviewed interface issues that could occur with upper management, matrix management, technical oversight, and organizational peers. The team's experience is also evaluated in comparison to other Self-Directed Work Teams

  19. Evaluating impact of clinical guidelines using a realist evaluation framework.

    Science.gov (United States)

    Reddy, Sandeep; Wakerman, John; Westhorp, Gill; Herring, Sally

    2015-12-01

    The Remote Primary Health Care Manuals (RPHCM) project team manages the development and publication of clinical protocols and procedures for primary care clinicians practicing in remote Australia. The Central Australian Rural Practitioners Association Standard Treatment Manual, the flagship manual of the RPHCM suite, has been evaluated for accessibility and acceptability in remote clinics three times in its 20-year history. These evaluations did not consider a theory-based framework or a programme theory, resulting in some limitations with the evaluation findings. With the RPHCM having an aim of enabling evidence-based practice in remote clinics and anecdotally reported to do so, testing this empirically for the full suite is vital for both stakeholders and future editions of the RPHCM. The project team utilized a realist evaluation framework to assess how, why and for what the RPHCM were being used by remote practitioners. A theory regarding the circumstances in which the manuals have and have not enabled evidence-based practice in the remote clinical context was tested. The project assessed this theory for all the manuals in the RPHCM suite, across government and aboriginal community-controlled clinics, in three regions of Australia. Implementing a realist evaluation framework to generate robust findings in this context has required innovation in the evaluation design and adaptation by researchers. This article captures the RPHCM team's experience in designing this evaluation. © 2015 John Wiley & Sons, Ltd.

  20. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  1. Experience as Knowledge in a New Product Development Team: Implications for Knowledge Management

    Science.gov (United States)

    Cooper, Lynne P.

    2009-01-01

    This study was conducted to better understand how New Product Development (NPD) team members apply their experiences to meet the task needs of their project. Although "experience" is highly valued in team members, little research has looked specifically at experiences as a type of knowledge, and how this knowledge is used in work settings. This research evaluated nearly 200 instances where team members referenced past experiences during team meetings. During these experience exchanges, team members structured the sharing of their experiences to include three common elements: the source of the experience, the nature of the experience, and the degree of relevance to the current work of the team. The experiences fell into four categories: people (relationships), process, product, and politics. This paper describes how team members structured, applied, and integrated their individual experiences and presents the resulting implications for knowledge management systems that wish to exploit experience knowledge.

  2. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  3. Improving Engineering Student Team Collaborative Discussions by Moving Them Online: An Investigation of Synchronous Chat and Face-to-Face Team Conversations

    Science.gov (United States)

    Fowler, Robin Revette

    2014-01-01

    Collaborative learning, particularly in the context of team-based, project-based learning, is common in undergraduate engineering education and is associated with deeper learning and enhanced student motivation and retention. However, grouping students in teams for project-based learning sometimes has negative outcomes, which can include lowered…

  4. Task conflict and team creativity: a question of how much and when.

    Science.gov (United States)

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  5. Conceptualizing Interprofessional Teams as Multi-Team Systems-Implications for Assessment and Training.

    Science.gov (United States)

    West, Courtney; Landry, Karen; Graham, Anna; Graham, Lori; Cianciolo, Anna T; Kalet, Adina; Rosen, Michael; Sherman, Deborah Witt

    2015-01-01

    SGEA 2015 CONFERENCE ABSTRACT (EDITED). Evaluating Interprofessional Teamwork During a Large-Scale Simulation. Courtney West, Karen Landry, Anna Graham, and Lori Graham. CONSTRUCT: This study investigated the multidimensional measurement of interprofessional (IPE) teamwork as part of large-scale simulation training. Healthcare team function has a direct impact on patient safety and quality of care. However, IPE team training has not been the norm. Recognizing the importance of developing team-based collaborative care, our College of Nursing implemented an IPE simulation activity called Disaster Day and invited other professions to participate. The exercise consists of two sessions: one in the morning and another in the afternoon. The disaster scenario is announced just prior to each session, which consists of team building, a 90-minute simulation, and debriefing. Approximately 300 Nursing, Medicine, Pharmacy, Emergency Medical Technicians, and Radiology students and over 500 standardized and volunteer patients participated in the Disaster Day event. To improve student learning outcomes, we created 3 competency-based instruments to evaluate collaborative practice in multidimensional fashion during this exercise. A 20-item IPE Team Observation Instrument designed to assess interprofessional team's attainment of Interprofessional Education Collaborative (IPEC) competencies was completed by 20 faculty and staff observing the Disaster Day simulation. One hundred sixty-six standardized patients completed a 10-item Standardized Patient IPE Team Evaluation Instrument developed from the IPEC competencies and adapted items from the 2014 Henry et al. PIVOT Questionnaire. This instrument assessed the standardized or volunteer patient's perception of the team's collaborative performance. A 29-item IPE Team's Perception of Collaborative Care Questionnaire, also created from the IPEC competencies and divided into 5 categories of Values/Ethics, Roles and Responsibilities

  6. Evaluation of KFB-funded research on transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, D.; Knudsen, T.; Wegener, M.

    1999-09-01

    This report presents an evaluation of two research projects on transport systems, which have been financed fully or partially by KFB. The projects are: l. Systems analysis of transport markets at the Division of Transport and Location Analysis in the Department of Infrastructure and Planning of the Royal Institute of Technology, Stockholm; and 2. Planning, analysis and management in traffic networks - optimization models and methods at the Division of Optimization in the Department of Mathematics at Linkoeping University. The evaluation seeks to examine the scientific quality of the research and its relevance to the academic world and society. The two project teams prepared a self-assessment of their research activities and submitted copies of relevant publications. The evaluation committee visited both institutions and engaged the teams in discussions of their results and methodology. These visits occurred on June 1 and 2, 1999. This report is based on the self-assessments of the teams, the materials submitted and the meetings with the project teams. The evaluation and recommendations presented in the report are those of the reviewers and do not necessarily represent the views of KFB

  7. Pedagogical innovation in teacher teams

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This paper presents findings from a longitudinal design-based research project examining how to enable reflection and pedagogical innovation in teacher teams. The article identifies and analyses the teachers’ learning trajectories and innovative strategies when working together in the IT...... learning designs, the research aims to clarify what kind of knowledge is being developed and shared in the teacher teams, and how this contributes to the organisational learning process. The context is Global Classroom, an innovative synchronous hybrid videoconference concept, where adult students can......-pedagogical Think Tank for Teacher Teams (after this: ITP4T) (Weitze, 2014a), a competence development model, which was developed in an earlier phase of the research project. By using theoretical lenses from innovative knowledge development frameworks to examine the teachers’ utterances, interactions and new...

  8. Crisis Team Management in a Scarce Resource Setting: Angkor Hospital for Children in Siem Reap, Cambodia

    Directory of Open Access Journals (Sweden)

    Richard Alynn Henker

    2017-07-01

    Full Text Available IntroductionA crisis team management (CTM simulation course was developed by volunteers from Health Volunteers Overseas for physicians and nurses at Angkor Hospital for Children (AHC in Siem Reap, Cambodia. The framework for the course was adapted from crisis resource management (1, 2, crisis team training (3, and TeamSTEPPs© models (4. The CTM course focused on teaching physicians and nurses on the development of team performance knowledge, skills, and attitudes. Challenges to providing this course at AHC included availability of simulation equipment, cultural differences in learning, and language barriers. The purpose of this project was to evaluate the impact of a CTM simulation course at AHC on attitudes and perceptions of participants on concepts related to team performance.MethodsEach of the CTM courses consisted of three lectures, including team performance concepts, communication, and debriefing followed by rotation through four simulation scenarios. The evaluation instrument used to evaluate the AHC CTM course was developed for Cambodian staff at AHC based on TeamSTEPPs© instruments evaluating attitude and perceptions of team performance (5. CTM team performance concepts included in lectures, debriefing sessions, and the evaluation instrument were: team structure, leadership, situation monitoring, mutual support, and communication. The Wilcoxon signed-rank test was used to analyze pre- and post-test paired data from participants in the course.ResultsOf the 54 participants completing the three CTM courses at AHC, 27 were nurses, 6 were anesthetists, and 21 were physicians. Attitude and perception scores were found to significantly improve (p < 0.05 for team structure, leadership, situation monitoring, and communication. Team performance areas that improved the most were: discussion of team performance, communication, and exchange of information.ConclusionTeaching of non-technical skills can be effective in a setting with scarce

  9. Crisis Team Management in a Scarce Resource Setting: Angkor Hospital for Children in Siem Reap, Cambodia.

    Science.gov (United States)

    Henker, Richard Alynn; Henker, Hiroko; Eng, Hor; O'Donnell, John; Jirativanont, Tachawan

    2017-01-01

    A crisis team management (CTM) simulation course was developed by volunteers from Health Volunteers Overseas for physicians and nurses at Angkor Hospital for Children (AHC) in Siem Reap, Cambodia. The framework for the course was adapted from crisis resource management (1, 2), crisis team training (3), and TeamSTEPPs© models (4). The CTM course focused on teaching physicians and nurses on the development of team performance knowledge, skills, and attitudes. Challenges to providing this course at AHC included availability of simulation equipment, cultural differences in learning, and language barriers. The purpose of this project was to evaluate the impact of a CTM simulation course at AHC on attitudes and perceptions of participants on concepts related to team performance. Each of the CTM courses consisted of three lectures, including team performance concepts, communication, and debriefing followed by rotation through four simulation scenarios. The evaluation instrument used to evaluate the AHC CTM course was developed for Cambodian staff at AHC based on TeamSTEPPs© instruments evaluating attitude and perceptions of team performance (5). CTM team performance concepts included in lectures, debriefing sessions, and the evaluation instrument were: team structure, leadership, situation monitoring, mutual support, and communication. The Wilcoxon signed-rank test was used to analyze pre- and post-test paired data from participants in the course. Of the 54 participants completing the three CTM courses at AHC, 27 were nurses, 6 were anesthetists, and 21 were physicians. Attitude and perception scores were found to significantly improve ( p  < 0.05) for team structure, leadership, situation monitoring, and communication. Team performance areas that improved the most were: discussion of team performance, communication, and exchange of information. Teaching of non-technical skills can be effective in a setting with scarce resources in a Southeastern Asian country.

  10. Technology Applications Team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.

  11. Collaborative Evaluation and Market Research Converge: An Innovative Model Agricultural Development Program Evaluation in Southern Sudan

    Science.gov (United States)

    O'Sullivan, John M.; O'Sullivan, Rita

    2012-01-01

    In June and July 2006 a team of outside experts arrived in Yei, Southern Sudan through an AID project to provide support to a local agricultural development project. The team brought evaluation, agricultural marketing and financial management expertise to the in-country partners looking at steps to rebuild the economy of the war ravaged region. A…

  12. Exploring the concept of a team approach to wound care: Managing wounds as a team.

    Science.gov (United States)

    Moore, Zena; Butcher, Gillian; Corbett, Lisa Q; McGuiness, William; Snyder, Robert J; van Acker, Kristien

    2014-05-01

    Background - The growing prevalence and incidence of nonhealing acute and chronic wounds is a worrying concern. A major challenge is the lack of united services aimed at addressing the complex needs of individuals with wounds. However, the WHO argues that interprofessional collaboration in education and practice is key to providing the best patient care, enhancing clinical and health-related outcomes and strengthening the health system. It is based on this background that the team approach to wound care project was conceptualised. The project was jointly initiated and realised by the Association for the Advancement of Wound Care (AAWC-USA), the Australian Wound Management Association (AWMA) and the European Wound Management Association (EWMA). Aim - The aim of this project was to develop a universal model for the adoption of a team approach to wound care. Objective The overarching objective of this project was to provide recommendations for implementing a team approach to wound care within all clinical settings and through this to develop a model for advocating the team approach toward decision makers in national government levels. Method An integrative literature review was conducted. Using this knowledge, the authors arrived at a consensus on the most appropriate model to adopt and realise a team approach to wound care. Results - Eighty four articles met the inclusion criteria. Following data extraction, it was evident that none of the articles provided a definition for the terms multidisciplinary, interdisciplinary or transdisciplinary in the context of wound care. Given this lack of clarity within the wound care literature, the authors have here developed a Universal Model for the Team Approach to Wound Care to fill this gap in our current understanding. Conclusion - We advocate that the patient should be at the heart of all decision-making, as working with the Universal Model for the Team Approach to Wound Care begins with the needs of the patient. To

  13. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    Science.gov (United States)

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  14. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  15. Team Emergency Assessment Measure (TEAM) for the assessment of non-technical skills during resuscitation: Validation of the French version.

    Science.gov (United States)

    Maignan, Maxime; Koch, François-Xavier; Chaix, Jordane; Phellouzat, Pierre; Binauld, Gery; Collomb Muret, Roselyne; Cooper, Simon J; Labarère, José; Danel, Vincent; Viglino, Damien; Debaty, Guillaume

    2016-04-01

    Evaluation of team performances during medical simulation must rely on validated and reproducible tools. Our aim was to build and validate a French version of the Team Emergency Assessment Measure (TEAM) score, which was developed for the assessment of team performance and non-technical skills during resuscitation. A forward and backward translation of the initial TEAM score was made, with the agreement and the final validation by the original author. Ten medical teams were recruited and performed a standardized cardiac arrest simulation scenario. Teams were videotaped and nine raters evaluate non-technical skills for each team thanks to the French TEAM Score. Psychometric properties of the score were then evaluated. French TEAM score showed an excellent reliability with a Cronbach coefficient of 0.95. Mean correlation coefficient between each item and the global score range was 0.78. The inter-rater reliability measured by intraclass correlation coefficient of the global score was 0.93. Finally, expert teams had higher French TEAM score than intermediate and novice teams. The French TEAM score shows good psychometric properties to evaluate team performance during cardiac arrest simulation. Its utilization could help in the assessment of non-technical skills during simulation. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  16. Development and psychometric evaluation of a new team effectiveness scale for all types of community adult mental health teams: a mixed-methods approach.

    Science.gov (United States)

    El Ansari, Walid; Lyubovnikova, Joanne; Middleton, Hugh; Dawson, Jeremy F; Naylor, Paul B; West, Michael A

    2016-05-01

    Defining 'effectiveness' in the context of community mental health teams (CMHTs) has become increasingly difficult under the current pattern of provision required in National Health Service mental health services in England. The aim of this study was to establish the characteristics of multi-professional team working effectiveness in adult CMHTs to develop a new measure of CMHT effectiveness. The study was conducted between May and November 2010 and comprised two stages. Stage 1 used a formative evaluative approach based on the Productivity Measurement and Enhancement System to develop the scale with multiple stakeholder groups over a series of qualitative workshops held in various locations across England. Stage 2 analysed responses from a cross-sectional survey of 1500 members in 135 CMHTs from 11 Mental Health Trusts in England to determine the scale's psychometric properties. Based on an analysis of its structural validity and reliability, the resultant 20-item scale demonstrated good psychometric properties and captured one overall latent factor of CMHT effectiveness comprising seven dimensions: improved service user well-being, creative problem-solving, continuous care, inter-team working, respect between professionals, engagement with carers and therapeutic relationships with service users. The scale will be of significant value to CMHTs and healthcare commissioners both nationally and internationally for monitoring, evaluating and improving team functioning in practice. © 2015 John Wiley & Sons Ltd.

  17. Transport Project Evaluation

    DEFF Research Database (Denmark)

    Leleur, Steen

    1996-01-01

    Two main project evaluation approaches exist: cost-benefit analysis (CBA) and multi-criteria analysis (MCA). Related to a European road evaluation method (EURET 1.1) and the MCA-method, WARP, the paper proposes a set of so-called segregated investment return rates (SIRR) to integrate advantages...

  18. Virtual Teams and Knowledge Communication

    DEFF Research Database (Denmark)

    Lehtonen, Miikka; Kampf, Constance Elizabeth

    2014-01-01

    How does culture affect virtual teams and the knowledge communication processes in which they engage? As virtual spaces are increasingly used to support teams and establish collaboration in cross-cultural projects, the notion of cross-cultural communication can be understood as shifting from...... contextual perspective to a semiotic perspective. That is to say, although the team members are using the same vocabulary they might attach different meanings to and have different knowledge about them thus highlighting the importance of approaching virtual teams and collaboration from a semiotic perspective....... To look at how knowledge about virtual work is established in a multinational context, we interviewed members of a team that connects Finland and India. Results reveal five objects shared between the team members with varying knowledge about them. By making these differences in knowledge visible through...

  19. Volunteer Team Management

    OpenAIRE

    Monych, Maria

    2015-01-01

    This thesis looked into volunteer team management in a project in AIESEC in Finland through the action research method. AIESEC in Finland is a non-profit non-government organization with a purpose of “peace and fulfilment of humankinds potential” through development of the youth’s future leadership. AIESEC was not a commissioning party; the project was the basis for the thesis without the supervision of the company. The thesis is based on a project that the author was in charge of, in ...

  20. An Evaluation of the British Red Cross’ Educational Pilot Project for Young People Serving Reparation Orders

    OpenAIRE

    Dresser, Paul; Irving, Adele; Soppitt, Sarah

    2015-01-01

    Using Newcastle Youth Offending Team (YOT) as a case-study, this report presents the findings of the evaluation of the British Red Cross (BRC) Educational Pilot Project (EPP) for service users serving reparation as part of Community Orders. The EPP was implemented between November 2011 and June 2012. However prior to this development, the BRC and Newcastle YOT had been working in partnership since 2005, to offer young people alternative forms of youth justice, focused around more physical tas...

  1. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  2. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  3. Assessing the impact on intercultural competencies when engineering students solve problems in multicultural teams

    DEFF Research Database (Denmark)

    Jensen, Lars Peter; Nygaard, Bjørn; Madsen, Linda

    2011-01-01

    solving problems in teams two times a year in all of their bachelor education. In at least four of the engineering education institutes in Denmark experiments on helping mixed student teams to perform better in their project work have been carried out for some years using a classic engineering trial......’ intercultural competencies. It was decided to start a formal research project to investigate some of the existing experiments helping mixed teams to cope with project work in intercultural teams. During spring 2010 the setup for the research project was developed by a group of representatives from...... as exchange students or to take a full degree. Project organized Problem based Learning is used to a high extent at most of the engineering educations in Denmark, using large scale project work (up to 15 ECTS each semester) solved in teams (3-7 students in each team). In more and more situations the teams...

  4. Every team needs a coach: Training for interprofessional clinical placements.

    Science.gov (United States)

    Grymonpre, Ruby; Bowman, Susan; Rippin-Sisler, Cathy; Klaasen, Kathleen; Bapuji, Sunita B; Norrie, Ola; Metge, Colleen

    2016-09-01

    Despite growing awareness of the benefits of interprofessional education and interprofessional collaboration (IPC), understanding how teams successfully transition to IPC is limited. Student exposure to interprofessional teams fosters the learners' integration and application of classroom-based interprofessional theory to practice. A further benefit might be reinforcing the value of IPC to members of the mentoring team and strengthening their IPC. The research question for this study was: Does training in IPC and clinical team facilitation and mentorship of pre-licensure learners during interprofessional clinical placements improve the mentoring teams' collaborative working relationships compared to control teams? Statistical analyses included repeated time analysis multivariate analysis of variance (MANOVA). Teams on four clinical units participated in the project. Impact on intervention teams pre- versus post-interprofessional clinical placement was modest with only the Cost of Team score of the Attitudes Towards Healthcare Team Scale improving relative to controls (p = 0.059) although reflective evaluations by intervention team members noted many perceived benefits of interprofessional clinical placements. The significantly higher group scores for control teams (geriatric and palliative care) on three of four subscales of the Assessment of Interprofessional Team Collaboration Scale underscore our need to better understand the unique features within geriatric and palliative care settings that foster superior IPC and to recognise that the transition to IPC likely requires a more diverse intervention than the interprofessional clinical placement experience implemented in this study. More recently, it is encouraging to see the development of innovative tools that use an evidence-based, multi-dimensional approach to support teams in their transition to IPC.

  5. Developing leadership in rural interprofessional palliative care teams.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Handfield-Jones, Richard; Bouvette, Maryse

    2008-01-01

    This project brought together community-based practitioners and academics to develop and deliver interventions designed to enhance the leadership abilities of the designated leaders of seven rural/small town-based palliative care teams. Members of these community-based teams have already gained recognition for their teams' leadership and service delivery in their communities. All of the teams had worked closely with most members of the academic team prior to this project. The team members participated in a needs assessment exercise developed by the Sisters of Charity of Ottawa Health Service and University of Ottawa academic team. Results of the needs assessment identified leadership qualities that had contributed to their success, as well as their needs to further enhance their individual leadership qualities. The team effort, however, was the most important factor contributing to the success of their work. The interventions developed to address the identified needs had to be adapted creatively through the collaborative efforts of both the community and academic teams. The educational interventions facilitated the integration of learning at the individual and community level into the busy work schedules of primary health care providers.

  6. 12 strategies for managing capital projects.

    Science.gov (United States)

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods.

  7. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  8. Gender and tenure diversity in GitHub teams

    NARCIS (Netherlands)

    Vasilescu, B.N.; Posnett, D.; Ray, B.; Brand, van den M.G.J.; Serebrenik, A.; Devanbu, P.; Filkov, V.

    2015-01-01

    Software development is usually a collaborative venture. Open Source Software (OSS) projects are no exception; indeed, by design, the OSS approach can accommodate teams that are more open, geographically distributed, and dynamic than commercial teams. This, we find, leads to OSS teams that are quite

  9. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  10. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  11. Teaching MBA Students Teamwork and Team Leadership Skills: An Empirical Evaluation of a Classroom Educational Program

    Science.gov (United States)

    Hobson, Charles J.; Strupeck, David; Griffin, Andrea; Szostek, Jana; Rominger, Anna S.

    2014-01-01

    A comprehensive educational program for teaching behavioral teamwork and team leadership skills was rigorously evaluated with 148 MBA students enrolled at an urban regional campus of a Midwestern public university. Major program components included (1) videotaped student teams in leaderless group discussion (LGD) exercises at the course beginning…

  12. IT Project Evaluation and Investment Decision

    Institute of Scientific and Technical Information of China (English)

    黄东兵; 张世英

    2004-01-01

    There are many kinds of real options,which are valuable,in each phase of the lifetime of an information technology(IT)project.However,in the current IT investment decision theory,real options that embedded in IT projects are not considered. In this paper, the process of IT project decision and implementation is fully analyzed, the real options that may be embedded in an IT project are identified, and a real option analysis (ROA) method is proposed for evaluation of an IT project under uncertain business environment. ROA employs Black-Scholes expansion model and cancels the assumption that the cost of project is certain. The numerical example manifests that the ROA can better evaluate IT project and select the IT investment alternative. Finally, a road map is provided to help selecting the suitable evaluation method to make IT investment decision.

  13. Longitudinal observations of globally distributed design teams: The impacts on Product Development

    DEFF Research Database (Denmark)

    Taylor, Thomas Paul; Ahmed-Kristensen, Saeema

    2015-01-01

    Factors impacting the success of Product Development (PD) projects are intensified when teams are distributed globally, making it a challenging task for project management to deal with effects on time, cost and quality. It is important for project management to understand when challenges......, such as communication difficulties, a lack of common vision between team members or issues related to documentation, may occur during PD projects, enabling them to take the necessary preventative action (Edmondson and Nembhard, 2009). When investigating factors impacting the success of PD, the majority of research...... studies of globally distributed design teams in PD projects. This paper aims to contribute to the further understanding of the factors impacting the success of PD projects when teams are distributed globally. With the results from a longitudinal observational study over 8 months, the factors impacting...

  14. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  15. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  16. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  17. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  18. Can an interprofessional tracheostomy team improve weaning to decannulation times? A quality improvement evaluation

    Science.gov (United States)

    Morrison, Melissa; Catalig, Marifel; Chris, Juliana; Pataki, Janos

    2016-01-01

    BACKGROUND: Percutaneous tracheostomy is a common procedure in the intensive care unit and, on patient transfer to the wards, there is a gap in ongoing tracheostomy management. There is some evidence that tracheostomy teams can shorten weaning to decannulation times. In response to lengthy weaning to decannulation times at Trillium Health Partners – Credit Valley Hospital site (Mississauga, Ontario), an interprofessional tracheostomy team, led by respiratory therapists and consisting of speech-language pathologists and intensive care physicians, was implemented. OBJECTIVE: To evaluate the interprofessional tracheostomy team and its impact on time from weaning off mechanical ventilation to decannulation; and time from weaning to speech-language pathology referral. METHODS: Performance metrics were collected retrospectively through chart review pre- and post-team implementation. The primary metrics evaluated were the time from weaning off mechanical ventilation to decannulation, and time to referral to speech-language pathology. RESULTS: Following implementation of the interprofessional tracheostomy team, there was no improvement in decannulation times or time from weaning to speech-language pathology referral. A significant improvement was noted in the average time to first tracheostomy tube change (36.2 days to 22.9 days; P=0.01) and average time to speech-language pathology referral following initial tracheostomy insertion (51.8 days to 26.3 days; P=0.01). CONCLUSION: An interprofessional tracheostomy team can improve the quality of tracheostomy care through earlier tracheostomy tube changes and swallowing assessment referrals. The lack of improved weaning to decannulation time was potentially due to poor adherence with established protocols as well as a change in mechanical ventilation practices. To validate the findings from this particular institution, a more rigorous quality improvement methodology should be considered in addition to strategies to improve

  19. Performance Evaluation and Opportunity Assessment for St. Bernard Project

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, B.

    2011-06-01

    This report describes efforts by IBACOS, a Department of Energy Building America research team, in the St. Bernard Project, a nonprofit, community-based organization whose mission is to assist Hurricane Katrina survivors return to their homes in the New Orleans area. The report focuses on energy modeling results of two plans that the St. Bernard Project put forth as 'typical' building types and on quality issues that were observed during the field walk and Best Practice recommendations that could improve the energy efficiency and durability of the renovated homes.

  20. Performance Evaluation and Opportunity Assessment for St. Bernard Project

    Energy Technology Data Exchange (ETDEWEB)

    Dickson, Bruce [IBACOS, Inc., Pittsburgh, PA (United States)

    2011-06-01

    This report describes efforts by IBACOS, a Building America research team, in the St. Bernard Project, a nonprofit, community-based organization whose mission is to assist Hurricane Katrina survivors to return to their homes in the New Orleans area. The report focuses on energy modeling results of two plans that the St. Bernard Project put forth as 'typical' building types and on quality issues that were observed during the field walk and best practice recommendations that could improve the energy efficiency and durability of the renovated homes.

  1. Team Work and Democratic Learning in Projectmanagement Training

    DEFF Research Database (Denmark)

    Lidon, Ivan; Rebollar, Ruben; Qvist, Palle

    of Zaragoza, which makes it possible to detect problems of teamwork functioning in groups while they develop their projects, in order to prevent possible failure once projects are completed. The Democratic Learning Questionnaire developed at Aalborg University, which studies the decision-making process within...... it possible to establish a correlation between a group's decision making process and the quality of its functioning as a team.......Project Management is a discipline of a basically professional nature. Training in Project Management must provide students with a series of professional competencies, among which teamwork stands out as one of the most important, since all projects, by definition, must be carried out by teams...

  2. Evaluation of Team-Based Care in an Urban Free Clinic Setting.

    Science.gov (United States)

    Iddins, Brenda W; Frank, Jennifer Sandson; Kannar, Pegah; Curry, William A; Mullins, Melissa; Hites, Lisle; Selleck, Cynthia

    2015-01-01

    This article reports the experiences of a school of nursing, academic health center, and community-based organization working via an interprofessional collaborative practice model to meet the mutual goal of serving the health care needs of an indigent, largely minority population in Birmingham, Alabama. The population suffers disproportionately from chronic health problems including diabetes, obesity, cardiovascular disease, asthma, and mental health disorders. The program emphasizes diabetes management because the academic health center recognized the need for transitional and primary care, including mental health services, for the increasing numbers of uninsured patients with diabetes and its comorbidities. Half of the clinicians involved in this project had no prior experience with interprofessional collaborative practice, and there was confusion regarding the roles of team members from the partnering institutions. Activities involving care coordination consistently received low scores on weekly rating scales leading to the creation of positions for a nurse care manager and pharmaceutical patient assistance program coordinator. Conversely, shared decision making and cooperation ratings were consistently high. Evaluation identified the need for reliable, accessible data and data analysis to target clinically effective interventions and care coordination and to assess cost effectiveness. The strengths, challenges, lessons learned, and next steps required for sustainability of this alignment are discussed.

  3. Safety investigation of team performance in accidents

    International Nuclear Information System (INIS)

    Petkov, G.; Todorov, V.; Takov, T.; Petrov, V.; Stoychev, K.; Vladimirov, V.; Chukov, I.

    2004-01-01

    The paper presents the capacities of the performance evaluation of teamwork (PET) method. Its practicability and efficiency are illustrated by retrospective human reliability analyse of the famous nuclear and maritime accidents. A quantitative assessment of operators' performance on the base of thermo-hydraulic (T/H) calculations and full-scope simulator data for set of NPP design basic accidents with WWER is demonstrated. The last data are obtained on the 'WWER-1000' full-scope simulator of Kozloduy NPP during the regular practical training of the operators' teams. An outlook on the 'evaluation system of main control room (MCR) operators' reliability' project, based on simulator data of operators' training is given

  4. Evaluating the High School Lunar Research Projects Program

    Science.gov (United States)

    Shaner, A. J.; Shupla, C.; Shipp, S.; Allen, J.; Kring, D. A.

    2013-01-01

    The Center for Lunar Science and Exploration (CLSE), a collaboration between the Lunar and Planetary Institute and NASA s Johnson Space Center, is one of seven member teams of the NASA Lunar Science Institute (NLSI). In addition to research and exploration activities, the CLSE team is deeply invested in education and outreach. In support of NASA s and NLSI s objective to train the next generation of scientists, CLSE s High School Lunar Research Projects program is a conduit through which high school students can actively participate in lunar science and learn about pathways into scientific careers. The objectives of the program are to enhance 1) student views of the nature of science; 2) student attitudes toward science and science careers; and 3) student knowledge of lunar science. In its first three years, approximately 168 students and 28 teachers from across the United States have participated in the program. Before beginning their research, students undertake Moon 101, a guided-inquiry activity designed to familiarize them with lunar science and exploration. Following Moon 101, and guided by a lunar scientist mentor, teams choose a research topic, ask their own research question, and design their own research approach to direct their investigation. At the conclusion of their research, teams present their results to a panel of lunar scientists. This panel selects four posters to be presented at the annual Lunar Science Forum held at NASA Ames. The top scoring team travels to the forum to present their research in person.

  5. The influence of personality and ability on undergraduate teamwork and team performance.

    Science.gov (United States)

    Rhee, Jinny; Parent, David; Basu, Anuradha

    2013-12-01

    The ability to work effectively on a team is highly valued by employers, and collaboration among students can lead to intrinsic motivation, increased persistence, and greater transferability of skills. Moreover, innovation often arises from multidisciplinary teamwork. The influence of personality and ability on undergraduate teamwork and performance is not comprehensively understood. An investigation was undertaken to explore correlations between team outcomes, personality measures and ability in an undergraduate population. Team outcomes included various self-, peer- and instructor ratings of skills, performance, and experience. Personality measures and ability involved the Five-Factor Model personality traits and GPA. Personality, GPA, and teamwork survey data, as well as instructor evaluations were collected from upper division team project courses in engineering, business, political science, and industrial design at a large public university. Characteristics of a multidisciplinary student team project were briefly examined. Personality, in terms of extraversion scores, was positively correlated with instructors' assessment of team performance in terms of oral and written presentation scores, which is consistent with prior research. Other correlations to instructor-, students' self- and peer-ratings were revealed and merit further study. The findings in this study can be used to understand important influences on successful teamwork, teamwork instruction and intervention and to understand the design of effective curricula in this area moving forward. The online version of this article (doi:10.1186/2193-1801-2-16) contains supplementary material, which is available to authorized users.

  6. Creating Robust Evaluation of ATE Projects

    Science.gov (United States)

    Eddy, Pamela L.

    2017-01-01

    Funded grant projects all involve some form of evaluation, and Advanced Technological Education (ATE) grants are no exception. Program evaluation serves as a critical component not only for evaluating if a project has met its intended and desired outcomes, but the evaluation process is also a central feature of the grant application itself.…

  7. Douglass Rationalization: An Evaluation of a Team Environment and a Computer-Based Task in Academic Libraries

    Science.gov (United States)

    Denda, Kayo; Smulewitz, Gracemary

    2004-01-01

    In the contemporary library environment, the presence of the Internet and the infrastructure of the integrated library system suggest an integrated internal organization. The article describes the example of Douglass Rationalization, a team-based collaborative project to refocus the collection of Rutgers' Douglass Library, taking advantage of the…

  8. Tiger Team Assessment of the Strategic Petroleum Reserve

    International Nuclear Information System (INIS)

    1992-04-01

    This report documents the Tiger Team Assessment of the Strategic Petroleum Reserves (SPR) located in Louisiana and Texas, which consists of a project management office in New Orleans, a marine terminal located on the Mississippi River in Louisiana, and five crude oil storage sites in Louisiana and Texas. SPR is operated by Boeing Petroleum Services, Inc. for the US Department of Energy (DOE). DOE's Office of Fossil Energy (FE) is the responsible program organization and the Department of Energy Strategic Petroleum Reserve Project Management Office (SPRPMO) in Louisiana provides local oversight. The Tiger Team Assessment was conducted from March 9 to April 10, 1992, under the auspices of DOE's Office of Special Projects (OSP) under the Office of Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES ampersand H), and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, States of Louisiana and Texas, and local regulations; applicable DOE Orders; best management practices; and internal SPR requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of SPRPMO and BPS management of the ES ampersand H/QA and self-assessment programs was conducted. 6 fig., 22 tab

  9. Evaluation of microfinance projects.

    Science.gov (United States)

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  10. Patient Centeredness in Electronic Communication: Evaluation of Patient-to-Health Care Team Secure Messaging

    Science.gov (United States)

    Luger, Tana M; Volkman, Julie E; Rocheleau, Mary; Mueller, Nora; Barker, Anna M; Nazi, Kim M; Houston, Thomas K; Bokhour, Barbara G

    2018-01-01

    Background As information and communication technology is becoming more widely implemented across health care organizations, patient-provider email or asynchronous electronic secure messaging has the potential to support patient-centered communication. Within the medical home model of the Veterans Health Administration (VA), secure messaging is envisioned as a means to enhance access and strengthen the relationships between veterans and their health care team members. However, despite previous studies that have examined the content of electronic messages exchanged between patients and health care providers, less research has focused on the socioemotional aspects of the communication enacted through those messages. Objective Recognizing the potential of secure messaging to facilitate the goals of patient-centered care, the objectives of this analysis were to not only understand why patients and health care team members exchange secure messages but also to examine the socioemotional tone engendered in these messages. Methods We conducted a cross-sectional coding evaluation of a corpus of secure messages exchanged between patients and health care team members over 6 months at 8 VA facilities. We identified patients whose medical records showed secure messaging threads containing at least 2 messages and compiled a random sample of these threads. Drawing on previous literature regarding the analysis of asynchronous, patient-provider electronic communication, we developed a coding scheme comprising a series of a priori patient and health care team member codes. Three team members tested the scheme on a subset of the messages and then independently coded the sample of messaging threads. Results Of the 711 messages coded from the 384 messaging threads, 52.5% (373/711) were sent by patients and 47.5% (338/711) by health care team members. Patient and health care team member messages included logistical content (82.6%, 308/373 vs 89.1%, 301/338), were neutral in tone (70

  11. Managing Communication among Geographically Distributed Teams: A Brazilian Case

    Science.gov (United States)

    Almeida, Ana Carina M.; de Farias Junior, Ivaldir H.; de S. Carneiro, Pedro Jorge

    The growing demand for qualified professionals is making software companies opt for distributed software development (DSD). At the project conception, communication and synchronization of information are critical factors for success. However problems such as time-zone difference between teams, culture, language and different development processes among sites could difficult the communication among teams. In this way, the main goal of this paper is to describe the solution adopted by a Brazilian team to improve communication in a multisite project environment. The purposed solution was based on the best practices described in the literature, and the communication plan was created based on the infrastructure needed by the project. The outcome of this work is to minimize the impact of communication issues in multisite projects, increasing productivity, good understanding and avoiding rework on code and document writing.

  12. Promoting teamwork and surgical optimization: combining TeamSTEPPS with a specialty team protocol.

    Science.gov (United States)

    Tibbs, Sheila Marie; Moss, Jacqueline

    2014-11-01

    This quality improvement project was a 300-day descriptive preintervention and postintervention comparison consisting of a convenience sample of 18 gynecology surgical team members. We administered the Team Strategies & Tools to Enhance Performance and Patient Safety (TeamSTEPPS®) Teamwork Perception Questionnaire to measure the perception of teamwork. In addition, we collected data regarding rates of compliance (ie, huddle, time out) and measurable surgical procedure times. Results showed a statistically significant increase in the number of team members present for each procedure, 2.34 μ before compared with 2.61 μ after (P = .038), and in the final time-out (FTO) compliance as a result of a clarification of the definition of FTO, 1.05 μ before compared with 1.18 μ after (P = .004). Additionally, there was improvement in staff members' perception of teamwork. The implementation of team training, protocols, and algorithms can enhance surgical optimization, communication, and work relationships. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  13. Facilitating Transition to Team Based Design Education

    DEFF Research Database (Denmark)

    Tollestrup, Christian

    2014-01-01

    profession, but at the same time it becomes very difficult to identify where and how the design is created since form-giving now becomes a group effort. So as a way to ease the transition from highly framed and facilitated high school learning context to university self-driven learning context a small...... given to two set of students; one set that received the survival kit in 2011 and 2012 and one set that did not. The questionnaire inquires the students’ attitude towards 4 aspects: 1.General level of preparedness for team and problem based project work 2.Level of information of expectations from...... supervisors and programme 3.Reflection of the role in a team, problem based project work 4.The level of information of special expectations from the Industrial Design program towards team and problem based project work. Results indicates that Class receiving the “Survival Kit” improved in the calibration...

  14. A mixed methods evaluation of team-based learning for applied pathophysiology in undergraduate nursing education.

    Science.gov (United States)

    Branney, Jonathan; Priego-Hernández, Jacqueline

    2018-02-01

    It is important for nurses to have a thorough understanding of the biosciences such as pathophysiology that underpin nursing care. These courses include content that can be difficult to learn. Team-based learning is emerging as a strategy for enhancing learning in nurse education due to the promotion of individual learning as well as learning in teams. In this study we sought to evaluate the use of team-based learning in the teaching of applied pathophysiology to undergraduate student nurses. A mixed methods observational study. In a year two, undergraduate nursing applied pathophysiology module circulatory shock was taught using Team-based Learning while all remaining topics were taught using traditional lectures. After the Team-based Learning intervention the students were invited to complete the Team-based Learning Student Assessment Instrument, which measures accountability, preference and satisfaction with Team-based Learning. Students were also invited to focus group discussions to gain a more thorough understanding of their experience with Team-based Learning. Exam scores for answers to questions based on Team-based Learning-taught material were compared with those from lecture-taught material. Of the 197 students enrolled on the module, 167 (85% response rate) returned the instrument, the results from which indicated a favourable experience with Team-based Learning. Most students reported higher accountability (93%) and satisfaction (92%) with Team-based Learning. Lectures that promoted active learning were viewed as an important feature of the university experience which may explain the 76% exhibiting a preference for Team-based Learning. Most students wanted to make a meaningful contribution so as not to let down their team and they saw a clear relevance between the Team-based Learning activities and their own experiences of teamwork in clinical practice. Exam scores on the question related to Team-based Learning-taught material were comparable to those

  15. Learning to evaluate multidisciplinary crisis-management team exercises

    NARCIS (Netherlands)

    Berlo, M.P.W. van; Dommele, R. van; Schneider, P.; Veerdonk, I. van de; Braakhekke, E.; Hendriks van de Weem, N.; Dijkman, E. van; Wartna, S.

    2007-01-01

    Training of multidisciplinary crisis management teams is becoming more common practice. Nevertheless, the value of these trainings and exercises is questionable. Scenarios are quite often realistic and challenging to the trainees: the team members are heavily engaged in doing their jobs in a

  16. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  17. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  18. Habitat Evaluation Procedures (HEP) Report; Calispell Creek Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Calispell Creek property, an acquisition completed by the Kalispel Tribe of Indians in February 2004. Evaluation species and appropriate models include Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Calispell Creek Project provides a total of 138.17 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 5.16 HUs for mallard and muskrat. Grassland provides 132.02 HUs for mallard and Canada goose. Scrub-shrub vegetation provides 0.99 HUs for yellow warbler and white-tailed deer. The objective of using HEP at the Calispell Creek Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  19. Uranium resource evaluation project quality assurance evaluation

    International Nuclear Information System (INIS)

    Grimes, J.G.

    1981-01-01

    This evaluation was conducted over an eight-month period from February 4 through October 1, 1980. During this time, field sampling was suspended for an indefinite time period while the National Uranium Resource Evaluation (NURE) Program underwent restructuring. In addition, the Uranium Resource Evaluation (URE) Project archives are being restructured. Since it is difficult to evaluate quality assurance needs of a program that is undergoing drastic change and because sections of the evaluation were well along before these changes were announced, this evaluation reflects the situation as it was during February 1980. The following quality assurance related programs are continuing to date: (1) periodic checks of field sampling procedures by the Supervising Field Geologist and the Director of Field Operations; (2) verification of field form information and laboratory analytical data verification for all geochemical surveys; (3) URE Project laboratory quality control program (all elements routinely analyzed); and (4) Ames interlaboratory quality control program (uranium only). UCC-ND was given the responsibility of conducting a Hydrogeochemical and Stream Sediment Reconnaissance (HSSR) survey in the Central United States (Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Nebraska, North Dakota, Oklahoma, Texas, South Dakota, and Wisconsin). During 1979 and 1980, 13 detailed surveys were conducted by the URE Project in the Central and Western United States to characterize the hydrogeochemistry, stream sediment geochemistry, and/or radiometric patterns of known or potential uranium occurrences. Beginning in 1980, the HSSR surveys were modified to the Regional Hydrogeochemical and Stream Sediment (RHSS) surveys

  20. Intercultural Competence – Key Competence of Multicultural Teams

    Directory of Open Access Journals (Sweden)

    Diana Bebenova - Nikolova

    2014-08-01

    Full Text Available The article deals with intercultural competence of multicultural teams elaborating European projects. Firstly, it discusses basic theoretical aspects of the related concepts: culture and intercultural competence, then presents its impact on multicultural team effectiveness and models for improving it. The article finds ground on studies of intercultural competence as a set of strategic, personal, social and professional competences. The paper uses the project cycle management theory and proves that in multi-ethnic surroundings, the project membersř communication skills might not be sufficient to generate mutual understanding. Provisionally, the study performed a standardized Internet survey on self-assessment of intercultural competence among 50 experts on European projects. Another applied approach is field observation (attendance and note-taking of the 5- day training "To become diplomats between cultures", based on Bennettřs theoretical model for "Development of Intercultural Sensitivity". A training model for improving intercultural competence of multicultural team members. Possible approach for improvement of project management of crossborder or trans-border funding programs. Building intercultural competence in European project management is important, timely and necessity-driven, especially under the framework of the Danube Region Strategy.

  1. Effects of Individual Success on Globally Distributed Team Performance

    OpenAIRE

    Yılmaz, Onur

    2013-01-01

    Necessity of different competencies with high level of knowledge makes it inevitable that software development is a team work. With the today's technology, teams can communicate both synchronously and asynchronously using different online collaboration tools throughout the world. Researches indicate that there are many factors that affect the team success and in this paper, effect of individual success on globally distributed team performance will be analyzed. Student team projects undertaken...

  2. The Team to Address Bariatric Care in Canadian Children (Team ABC3): Team Grant Research Proposal.

    Science.gov (United States)

    2017-10-05

    Severe obesity (SO) in Canadian children remains poorly understood. However, based on international data, the prevalence of SO appears to be increasing and is associated with a number of psychosocial, bio-mechanical, and cardiometabolic health risks. The purpose of our national Team to Address Bariatric Care in Canadian Children (Team ABC3) is to develop and lead a series of inter-related studies to enhance the understanding and management of SO in Canadian children and adolescents (0-18 years). From 2015 to 2019, Team ABC3 will conduct a series of projects at the regional, provincial, and national levels using multiple methods and study designs to respond to key knowledge gaps by (i) generating evidence on the prevalence of SO and its impact on health services utilization in children using existing Canadian data sources from primary care settings, (ii) exploring contemporary definitions of SO that link with health outcomes, (iii) comparing and contrasting health risks across the continuum of SO, (iv) understanding potential barriers to and facilitators of treatment success in children with SO, and (v) examining innovative lifestyle and behavioral interventions designed to successfully manage SO in children and their families. Furthermore, to examine the impact of innovative interventions on the management SO, we will (vi) evaluate whether adding a health coach, who provides support via text, email, and/or phone, improves children's ability to adhere to a web-based weight management program and (vii) test the feasibility and impact of a community-based weight management program for pre-school children with SO and their parents that combines group-based parenting sessions with in-home visits. Our research aligns with national priorities in obesity research, brings together leading scientists, clinicians, and stakeholders from across Canada, and will inform health services delivery throughout the country to provide the best care possible for children with SO and

  3. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    International Nuclear Information System (INIS)

    Andersson, J.

    1993-01-01

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reason for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments

  4. Red Teaming of Advanced Information Assurance Concepts

    International Nuclear Information System (INIS)

    DUGGAN, RUTH A.; WOOD, BRADLEY

    1999-01-01

    Red Teaming is an advanced form of assessment that can be used to identify weaknesses in a variety of cyber systems. it is especially beneficial when the target system is still in development when designers can readily affect improvements. This paper discusses the red team analysis process and the author's experiences applying this process to five selected Information Technology Office (ITO) projects. Some detail of the overall methodology, summary results from the five projects, and lessons learned are contained within this paper

  5. Teaming. The Key to World Class Manufacturing.

    Science.gov (United States)

    Wright, John R.

    1999-01-01

    Lean manufacturing, a streamlined system of flow and job shop techniques, relies on self-directed work teams. Technology educators can prepare students for work in this environment by using problem-solving teams in the classroom to work on design briefs and other group projects. (SK)

  6. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  7. Team physicians in college athletics.

    Science.gov (United States)

    Steiner, Mark E; Quigley, D Bradford; Wang, Frank; Balint, Christopher R; Boland, Arthur L

    2005-10-01

    There has been little documentation of what constitutes the clinical work of intercollegiate team physicians. Team physicians could be recruited based on the needs of athletes. A multidisciplinary team of physicians is necessary to treat college athletes. Most physician evaluations are for musculoskeletal injuries treated nonoperatively. Descriptive epidemiology study. For a 2-year period, a database was created that recorded information on team physician encounters with intercollegiate athletes at a major university. Data on imaging studies, hospitalizations, and surgeries were also recorded. The diagnoses for physician encounters with all undergraduates through the university's health service were also recorded. More initial athlete evaluations were for musculoskeletal diagnoses (73%) than for general medical diagnoses (27%) (P respiratory infections and dermatologic disorders, or multiple visits for concussions. Football accounted for 22% of all physician encounters, more than any other sport (P athletes did not require a greater number of physician encounters than did the general undergraduate pool of students on a per capita basis. Intercollegiate team physicians primarily treat musculoskeletal injuries that do not require surgery. General medical care is often single evaluations of common conditions and repeat evaluations for concussions.

  8. Payment Mechanisms for Integrated Teams in Construction

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available The overwhelming consensus for process andteam integration has emerged as an enabler tomanage construction projects. Theperformance of integrated teams is highlyaffected by the adopted payment mechanism.However, the payment mechanisms availablefor a project may need the team tocompromise in order to agree on a fairmechanism for as many members as possible.This paper introduces a methodology tosimulate the profiles of alternative paymentmechanisms. The methodology aims to helpproject teams define the most appropriatemechanism for each member. The proposedmethodology is therefore novel and superior toexisting cash flow models where the focus hasbeen limited to main contractors only. Topromote its use as a performance enablingmechanism, the methodology utilizes “theproject process map”, “the stakeholders &supply chain”, “the pricing method” and “thepayment mechanism”. This will act as an aid todesign or “fine-tune” payment mechanisms toindividual projects characteristics consideringpayment for off-site materials andcomponents, which always concerns projectfabricators and supply chain.

  9. Creating Shared Understanding in Product development Teams

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller; Tollestrup, Christian

    , they also have to figure out what their users and stakeholders find important. In other words, the team has to frame their project around real user needs, problems or opportunities – and figure out what people really want, and at the same time come to an agreement about this framing within the team......It is the first meeting in a new promising project. Everyone around the table is enthusiastic about the project and excited to get going. There is a good atmos¬phere and the discussion travels back and forth. Everyone tries to present their point of view, which results in a broad discussion on very...... if they have reached an agreement and everyone nods their approval. Everyone leaves the meeting, confident that they know what to do. A few weeks after, it is time for the second meeting. The team spirit is still high and there is a nice buzz in the meeting room, before the meeting starts. The introduction...

  10. Practice effects on intra-team synergies in football teams.

    Science.gov (United States)

    Silva, Pedro; Chung, Dante; Carvalho, Thiago; Cardoso, Tiago; Davids, Keith; Araújo, Duarte; Garganta, Júlio

    2016-04-01

    Developing synchronised player movements for fluent competitive match play is a common goal for coaches of team games. An ecological dynamics approach advocates that intra-team synchronization is governed by locally created information, which specifies shared affordances responsible for synergy formation. To verify this claim we evaluated coordination tendencies in two newly-formed teams of recreational players during association football practice games, weekly, for fifteen weeks (thirteen matches). We investigated practice effects on two central features of synergies in sports teams - dimensional compression and reciprocal compensation here captured through near in-phase modes of coordination and time delays between coupled players during forward and backwards movements on field while attacking and defending. Results verified that synergies were formed and dissolved rapidly as a result of the dynamic creation of informational properties, perceived as shared affordances among performers. Practising once a week led to small improvements in the readjustment delays between co-positioning team members, enabling faster regulation of coordinated team actions. Mean values of the number of player and team synergies displayed only limited improvements, possibly due to the timescales of practice. No relationship between improvements in dimensional compression and reciprocal compensation were found for number of shots, amount of ball possession and number of ball recoveries made. Findings open up new perspectives for monitoring team coordination processes in sport. Copyright © 2015 Elsevier B.V. All rights reserved.

  11. Patient Centeredness in Electronic Communication: Evaluation of Patient-to-Health Care Team Secure Messaging.

    Science.gov (United States)

    Hogan, Timothy P; Luger, Tana M; Volkman, Julie E; Rocheleau, Mary; Mueller, Nora; Barker, Anna M; Nazi, Kim M; Houston, Thomas K; Bokhour, Barbara G

    2018-03-08

    As information and communication technology is becoming more widely implemented across health care organizations, patient-provider email or asynchronous electronic secure messaging has the potential to support patient-centered communication. Within the medical home model of the Veterans Health Administration (VA), secure messaging is envisioned as a means to enhance access and strengthen the relationships between veterans and their health care team members. However, despite previous studies that have examined the content of electronic messages exchanged between patients and health care providers, less research has focused on the socioemotional aspects of the communication enacted through those messages. Recognizing the potential of secure messaging to facilitate the goals of patient-centered care, the objectives of this analysis were to not only understand why patients and health care team members exchange secure messages but also to examine the socioemotional tone engendered in these messages. We conducted a cross-sectional coding evaluation of a corpus of secure messages exchanged between patients and health care team members over 6 months at 8 VA facilities. We identified patients whose medical records showed secure messaging threads containing at least 2 messages and compiled a random sample of these threads. Drawing on previous literature regarding the analysis of asynchronous, patient-provider electronic communication, we developed a coding scheme comprising a series of a priori patient and health care team member codes. Three team members tested the scheme on a subset of the messages and then independently coded the sample of messaging threads. Of the 711 messages coded from the 384 messaging threads, 52.5% (373/711) were sent by patients and 47.5% (338/711) by health care team members. Patient and health care team member messages included logistical content (82.6%, 308/373 vs 89.1%, 301/338), were neutral in tone (70.2%, 262/373 vs 82.0%, 277/338), and

  12. Assessment of a Statewide Palliative Care Team Training Course: COMFORT Communication for Palliative Care Teams.

    Science.gov (United States)

    Wittenberg, Elaine; Ferrell, Betty; Goldsmith, Joy; Ragan, Sandra L; Paice, Judith

    2016-07-01

    Despite increased attention to communication skill training in palliative care, few interprofessional training programs are available and little is known about the impact of such training. This study evaluated a communication curriculum offered to interprofessional palliative care teams and examined the longitudinal impact of training. Interprofessional, hospital-based palliative care team members were competitively selected to participate in a two-day training using the COMFORT(TM SM) (Communication, Orientation and options, Mindful communication, Family, Openings, Relating, Team) Communication for Palliative Care Teams curriculum. Course evaluation and goal assessment were tracked at six and nine months postcourse. Interprofessional palliative care team members (n = 58) representing 29 teams attended the course and completed course goals. Participants included 28 nurses, 16 social workers, 8 physicians, 5 chaplains, and one psychologist. Precourse surveys assessed participants' perceptions of institution-wide communication performance across the continuum of care and resources supporting optimum communication. Postcourse evaluations and goal progress monitoring were used to assess training effectiveness. Participants reported moderate communication effectiveness in their institutions, with the weakest areas being during bereavement and survivorship care. Mean response to course evaluation across all participants was greater than 4 (scale of 1 = low to 5 = high). Participants taught an additional 962 providers and initiated institution-wide training for clinical staff, new hires, and volunteers. Team member training improved communication processes and increased attention to communication with family caregivers. Barriers to goal implementation included a lack of institutional support as evidenced in clinical caseloads and an absence of leadership and funding. The COMFORT(TM SM) communication curriculum is effective palliative care communication

  13. The big five personality traits and individual satisfaction with the team

    NARCIS (Netherlands)

    Peeters, Miranda A.G.; Rutte, Christel G.; van Tuijl, Harrie F.J.M.; Reymen, Isabelle

    2006-01-01

    Relationships between team composition in terms of team members' Big Five personality traits and individual satisfaction with the team after project completion were researched. Questionnaires were filled out by 310 undergraduate students (N= 68 teams) working on an engineering design assignment.

  14. Evaluation of a collaborative project to develop sustainable healthcare education in eight UK medical schools.

    Science.gov (United States)

    Walpole, S C; Mortimer, F

    2017-09-01

    Environmental change poses pressing challenges to public health and calls for profound and far-reaching changes to policy and practice across communities and health systems. Medical schools can act as a seedbed where knowledge, skills and innovation to address environmental challenges can be developed through innovative and collaborative approaches. The objectives of this study were to (1) explore drivers and challenges of collaboration for educational development between and within medical schools; (2) evaluate the effectiveness of a range of pedagogies for sustainable healthcare education; and (3) identify effective strategies to facilitate the renewal of medical curricula to address evolving health challenges. Participatory action research. Medical school teams participated in a nine-month collaborative project, including a one-day seminar to learn about sustainable healthcare education and develop a project plan. After the seminar, teams were supported to develop, deliver and evaluate new teaching at their medical school. New teaching was introduced at seven medical schools. A variety of pedagogies were represented. Collaboration between schools motivated and informed participants. The main challenges faced related to time pressures. Educators and students commented that new teaching was enjoyable and effective at improving knowledge and skills. Collaborative working supported educators to develop and implement new teaching sessions rapidly and effectively. Collaboration can help to build educators' confidence and capacity in a new area of education development. Different forms of collaboration may be appropriate for different circumstances and at different stages of education development. Copyright © 2017 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  15. Using realist evaluation to assess primary healthcare teams' responses to intimate partner violence in Spain.

    Science.gov (United States)

    Goicolea, Isabel; Hurtig, Anna-Karin; San Sebastian, Miguel; Marchal, Bruno; Vives-Cases, Carmen

    2015-01-01

    Few evaluations have assessed the factors triggering an adequate health care response to intimate partner violence. This article aimed to: 1) describe a realist evaluation carried out in Spain to ascertain why, how and under what circumstances primary health care teams respond to intimate partner violence, and 2) discuss the strengths and challenges of its application. We carried out a series of case studies in four steps. First, we developed an initial programme theory (PT1), based on interviews with managers. Second, we refined PT1 into PT2 by testing it in a primary healthcare team that was actively responding to violence. Third, we tested the refined PT2 by incorporating three other cases located in the same region. Qualitative and quantitative data were collected and thick descriptions were produced and analysed using a retroduction approach. Fourth, we analysed a total of 15 cases, and identified combinations of contextual factors and mechanisms that triggered an adequate response to violence by using qualitative comparative analysis. There were several key mechanisms -the teams' self-efficacy, perceived preparation, women-centred care-, and contextual factors -an enabling team environment and managerial style, the presence of motivated professionals, the use of the protocol and accumulated experience in primary health care- that should be considered to develop adequate primary health-care responses to violence. The full application of this realist evaluation was demanding, but also well suited to explore a complex intervention reflecting the situation in natural settings. Copyright © 2015 SESPAS. Published by Elsevier Espana. All rights reserved.

  16. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  17. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  18. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  19. Team Training for Dynamic Cross-Functional Teams in Aviation: Behavioral, Cognitive, and Performance Outcomes.

    Science.gov (United States)

    Littlepage, Glenn E; Hein, Michael B; Moffett, Richard G; Craig, Paul A; Georgiou, Andrea M

    2016-12-01

    This study evaluates the effectiveness of a training program designed to improve cross-functional coordination in airline operations. Teamwork across professional specializations is essential for safe and efficient airline operations, but aviation education primarily emphasizes positional knowledge and skill. Although crew resource management training is commonly used to provide some degree of teamwork training, it is generally focused on specific specializations, and little training is provided in coordination across specializations. The current study describes and evaluates a multifaceted training program designed to enhance teamwork and team performance of cross-functional teams within a simulated airline flight operations center. The training included a variety of components: orientation training, position-specific declarative knowledge training, position-specific procedural knowledge training, a series of high-fidelity team simulations, and a series of after-action reviews. Following training, participants demonstrated more effective teamwork, development of transactive memory, and more effective team performance. Multifaceted team training that incorporates positional training and team interaction in complex realistic situations and followed by after-action reviews can facilitate teamwork and team performance. Team training programs, such as the one described here, have potential to improve the training of aviation professionals. These techniques can be applied to other contexts where multidisciplinary teams and multiteam systems work to perform highly interdependent activities. © 2016, Human Factors and Ergonomics Society.

  20. The importance of team level tacit knowledge and related characteristics of high-performing health care teams.

    Science.gov (United States)

    Friedman, Leonard H; Bernell, Stephanie L

    2006-01-01

    Team level tacit knowledge is related to the collective knowledge of the team members. It is the shared experience that results in the ability to successfully anticipate the reactions of teammates in typical and nontypical situations. This study evaluates how tacit knowledge and related team characteristics influence the performance of cardiothoracic surgery teams.

  1. A theory-driven, longitudinal evaluation of the impact of team training on safety culture in 24 hospitals.

    Science.gov (United States)

    Jones, Katherine J; Skinner, Anne M; High, Robin; Reiter-Palmon, Roni

    2013-05-01

    Effective teamwork facilitates collective learning, which is integral to safety culture. There are no rigorous evaluations of the impact of team training on the four components of safety culture-reporting, just, flexible and learning cultures. We evaluated the impact of a year-long team training programme on safety culture in 24 hospitals using two theoretical frameworks. We used two quasi-experimental designs: a cross-sectional comparison of hospital survey on patient safety culture (HSOPS) results from an intervention group of 24 hospitals to a static group of 13 hospitals and a pre-post comparison of HSOPS results within intervention hospitals. Dependent variables were HSOPS items representing the four components of safety culture; independent variables were derived from items added to the HSOPS that measured the extent of team training, learning and transfer. We used a generalised linear mixed model approach to account for the correlated nature of the data. 59% of 2137 respondents from the intervention group reported receiving team training. Intervention group HSOPS scores were significantly higher than static group scores in three dimensions assessing the flexible and learning components of safety culture. The distribution of the adoption of team behaviours (transfer) varied in the intervention group from 2.8% to 31.0%. Adoption of team behaviours was significantly associated with odds of an individual reacting more positively at reassessment than baseline to nine items reflecting all four components of safety culture. Team training can result in transformational change in safety culture when the work environment supports the transfer of learning to new behaviour.

  2. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN

    International Nuclear Information System (INIS)

    Silva, Eduardo de Assumpcao

    2017-01-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  3. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  4. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  5. Evaluation of aviation-based safety team training in a hospital in The Netherlands

    NARCIS (Netherlands)

    de Korne, Dirk F.; van Wijngaarden, Jeroen D. H.; van Dyck, Cathy; Hiddema, U. Francis; Klazinga, Niek S.

    2014-01-01

    Purpose - The purpose of this paper is to evaluate the implementation of a broad-scale team resource management (TRM) program on safety culture in a Dutch eye hospital, detailing the program's content and procedures. Aviation-based TRM training is recognized as a useful approach to increase patient

  6. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  7. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  8. A Phenomenological Study of Teamwork in Online and Face-to-Face Student Teams

    Science.gov (United States)

    Saghafian, Marzieh; O'Neill, D. Kevin

    2018-01-01

    Team-based projects are widely used in both traditional face-to-face and online programs in higher education. To date, the teamwork experiences of students in each modality have been documented primarily through evaluative research conducted over short spans of time and limited by a priori frameworks. The literature also reflects a lack of…

  9. Habitat Evaluation Procedures (HEP) Report; Priest River Project, Technical Report 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 140.73 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 60.05 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland meadow habitat provides 7.39 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 71.13 HUs for mallard, yellow warbler, and white-tailed deer. Open water habitat provides 2.16 HUs for Canada goose and mallard. The objective of using HEP at the Priest River Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  10. Making star teams out of star players.

    Science.gov (United States)

    Mankins, Michael; Bird, Alan; Root, James

    2013-01-01

    Top talent is an invaluable asset: In highly specialized or creative work, for instance, "A" players are likely to be six times as productive as "B" players. So when your company has a crucial strategic project, why not multiply all that firepower and have a team of your best performers tackle it? Yet many companies hesitate to do this, believing that all-star teams don't work: Big egos will get in the way. The stars won't be able to work with one another. They'll drive the team Leader crazy. Mankins, Bird, and Root of Bain & Company believe it's time to set aside that thinking. They have seen all-star teams do extraordinary work. But there is a right way and a wrong way to organize them. Before you can even begin to assemble such a team, you need to have the right talent management practices, so you hire and develop the best people and know what they're capable of. You have to give the team appropriate incentives and leaders and support staffers who are stars in their own right. And projects that are ill-defined or small scale are not for all-star teams. Use them only for critical missions, and make sure their objectives are clear. Even with the right setup, things can still go wrong. The wise executive will take steps to manage egos, prune non-team-players, and prevent average coworkers from feeling completely undervalued. She will also invest a lot of time in choosing the right team Leader and will ask members for lots of feedback to monitor how that leader is doing.

  11. Managing Global Virtual Teams across Classrooms, Students and Faculty

    Science.gov (United States)

    Shea, Timothy P.; Sherer, Pamela D.; Quilling, Rosemary D.; Blewett, Craig N.

    2011-01-01

    Virtual teams are becoming commonplace in business today so our business school students should have experience in effectively working in virtual teams. Based on a month-long virtual team project conducted by the authors between classes in South Africa and the United States, this paper discusses the opportunities and challenges of using global…

  12. Evaluation of Current Automated Civil Engineer System Non-Appropriated Funds Project Programming Procedures

    National Research Council Canada - National Science Library

    Ligday, Joshua

    2004-01-01

    ...) project programming business rules within ACES. These problem areas were not addressed until recently when an integrated process team met and proposed numerous changes to how NAF programming is accomplished in ACES...

  13. Evaluation of aviation-based safety team training in a hospital in The Netherlands

    NARCIS (Netherlands)

    de Korne, D.F.; van Wijngaarden, J.D.H.; van Dyck, C.; Hiddema, F.; Klazinga, N.S.

    2014-01-01

    Purpose – The purpose of this paper is to evaluate the implementation of a broad-scale team resource management (TRM) program on safety culture in a Dutch eye hospital, detailing the program’s content and procedures. Aviation-based TRM training is recognized as a useful approach to increase patient

  14. Evaluation of aviation-based safety team training in a hospital in The Netherlands

    NARCIS (Netherlands)

    D.F. de Korne (Dirk); J.D.H. van Wijngaarden (Jeroen); C. van Dyck (Cathy); U.F. Hiddema (Frans); N.S. Klazinga (Niek)

    2014-01-01

    textabstractPurpose – The purpose of this paper is to evaluate the implementation of a broad-scale team resource management (TRM) program on safety culture in a Dutch eye hospital, detailing the program’s content and procedures. Aviation-based TRM training is recognized as a useful approach to

  15. The Team Up for School Nutrition Success workshop evaluation study: 3-month results

    Science.gov (United States)

    The purpose of this study was to evaluate the Team Up for School Nutrition Success pilot initiative, conducted by the Institute of Child Nutrition (ICN), on meeting the objectives of the individual action plans created by school food authorities (SFAs) during the workshop. The action plans could add...

  16. Evaluation of an institutional project to improve venous thromboembolism prevention.

    Science.gov (United States)

    Minami, Christina A; Yang, Anthony D; Ju, Mila; Culver, Eckford; Seifert, Kathryn; Kreutzer, Lindsey; Halverson, Terri; O'Leary, Kevin J; Bilimoria, Karl Y

    2016-12-01

    Northwestern Memorial Hospital (NMH) was historically a poor performer on the venous thromboembolism (VTE) outcome measure. As this measure has been shown to be flawed by surveillance bias, NMH embraced process-of-care measures to ensure appropriate VTE prophylaxis to assess healthcare-associated VTE prevention efforts. To evaluate the impact of an institution-wide project aimed at improving hospital performance on VTE prophylaxis measures. A retrospective observational study. NMH, an 885-bed academic medical center in Chicago, Illinois PATIENTS: Inpatients admitted to NMH from January 1, 2013 to May 1, 2013 and from October 1, 2014 to April 1, 2015 were eligible for evaluation. Using the define-measure-analyze-improve-control (DMAIC) process-improvement methodology, a multidisciplinary team implemented and iteratively improved 15 data-driven interventions in 4 broad areas: (1) electronic medical record (EMR) alerts, (2) education initiatives, (3) new EMR order sets, and (4) other EMR changes. The Joint Commission's 6 core measures and the Surgical Care Improvement Project (SCIP) SCIP-VTE-2 measure. Based on 3103 observations (1679 from January 1, 2013 to May 1, 2013, and 1424 from October 1, 2014 to April 1, 2015), performance on the core measures improved. Performance on measure 1 (chemoprophylaxis) improved from 82.5% to 90.2% on medicine services, and from 94.4% to 97.6% on surgical services. The largest improvements were seen in measure 4 (platelet monitoring), with a performance increase from 76.7% adherence to 100%, and measure 5 (warfarin discharge instructions), with a performance increase from 27.4% to 88.8%. A systematic hospital-wide DMAIC project improved VTE prophylaxis measure performance. Sustained performance has been observed, and novel control mechanisms for continued performance surveillance have been embedded in the hospital system. Journal of Hospital Medicine 2016;11:S29-S37. © 2016 Society of Hospital Medicine. © 2016 Society of Hospital

  17. Habitat Evaluation Procedures (HEP) Report; West Beaver Lake Project, Technical Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 82.69 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 8.80 HUs for mallard, muskrat, and Canada goose. Conifer forest habitat provides 70.33 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Open water provides 3.30 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  18. Habitat Evaluation Procedures (HEP) Report; Upper Trimble Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Upper Trimble property, an acquisition completed by the Kalispel Tribe of Indians in March 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Upper Trimble Project provides a total of 250.67 Habitat Units (HUs) for the species evaluated. Wet meadow provides 136.92 HUs for mallard, muskrat, and Canada goose. Mixed forest habitat provides 111.88 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub vegetation provides 1.87 HUs for yellow warbler, and white-tailed deer. The objective of using HEP at the Upper Trimble Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  19. The role of social capital on trust development and dynamics: Implications for cooperation, monitoring and team performance

    NARCIS (Netherlands)

    Costa, A.C.; Bijlsma-Frankema, K.M.; de Jong, B.A.

    2009-01-01

    This study examined the development and dynamics of trust in project teams and explored the relation with cooperation, monitoring and team performance. Two types of teams were distinguished at the start of the projects: low prior social-capital teams (teams composed of members that have no previous

  20. Patients as team members: opportunities, challenges and paradoxes of including patients in multi-professional healthcare teams.

    Science.gov (United States)

    Martin, Graham P; Finn, Rachael

    2011-11-01

    Current healthcare policy emphasises the need for more collaborative, team-based approaches to providing care, and for a greater voice for service users in the management and delivery of care. Increasingly, policy encourages 'partnerships' between users and professionals so that users, too, effectively become team members. In examining this phenomenon, this paper draws on insights from the organisational-sociological literature on team work, which highlights the challenges of bringing together diverse professional groups, but which has not, to date, been applied in contexts where users, too, are included in teams. Using data from a qualitative study of five pilot cancer-genetics projects, in which service users were included in teams responsible for managing and developing new services, it highlights the difficulties involved in making teams of such heterogeneous members-and the paradoxes that arise when this task is achieved. It reveals how the tension between integration and specialisation of team members, highlighted in the literature on teams in general, is especially acute for service users, the distinctiveness of whose contribution is more fragile, and open to blurring. © 2011 The Authors. Sociology of Health & Illness © 2011 Foundation for the Sociology of Health & Illness/Blackwell Publishing Ltd.

  1. A Descriptive Account of an Inter-Professional Collaborative Leadership Project

    Directory of Open Access Journals (Sweden)

    Maura MacPhee

    2014-09-01

    Full Text Available A collaborative project between an academic healthcare faculty and a professional development director resulted in the design, delivery and evaluation of an inter-professional collaborative leadership workshop with ongoing leadership development activities. The workshop attendees were five inter-professional teams from one large, urban cancer care center in Taipei, Taiwan. The workshop included didactic instruction complemented with team discussions and interactive exercises. Continued practice was encouraged, such as appreciative inquiry exercises and rotated team leadership. Evaluation involved the use of a cross-culturally validated collaborative practice tool and follow-up interviews and focus groups. Although the formal workshop was a 1-day session, continued organizational support and systematic approaches to collaborative leadership practice in clinical settings were necessary components for transfer of learning from the workshop to real life. This paper will include an overview of the foundational leadership concepts covered in the workshop. The instructional strategies, evaluation methods and outcomes will be discussed. The limitations and strengths of this collaborative leadership project will be provided, as well as future plans for a collaborative leadership development program.

  2. The European Union's four-man team of experts attending a demonstration of the DataGrid Project at CERN in early February.

    CERN Multimedia

    2003-01-01

    The DataGrid Project is reviewed by a team of European experts on a yearly basis. At the beginning of February it passed the second of these reviews with flying colours, the four experts issuing enthusiastic statements on the latest progress made, which was quite considerable in 2002.

  3. The Team up for School Nutrition Success Workshop Evaluation Study: Three Month Results

    Science.gov (United States)

    Cullen, Karen Weber; Rushing, Keith

    2017-01-01

    Purpose/Objectives: The purpose of this study was to evaluate the "Team Up for School Nutrition Success" pilot initiative, conducted by the Institute of Child Nutrition (ICN), on meeting the objectives of the individual action plans created by school food authorities (SFAs) during the workshop. The action plans could address improving…

  4. Ada training evaluation and recommendations from the Gamma Ray Observatory Ada Development Team

    International Nuclear Information System (INIS)

    1985-10-01

    The Ada training experiences of the Gamma Ray Observatory Ada development team are related, and recommendations are made concerning future Ada training for software developers. Training methods are evaluated, deficiencies in the training program are noted, and a recommended approach, including course outline, time allocation, and reference materials, is offered

  5. A Multidisciplinary Research Team Approach to Computer-Aided Drafting (CAD) System Selection. Final Report.

    Science.gov (United States)

    Franken, Ken; And Others

    A multidisciplinary research team was assembled to review existing computer-aided drafting (CAD) systems for the purpose of enabling staff in the Design Drafting Department at Linn Technical College (Missouri) to select the best system out of the many CAD systems in existence. During the initial stage of the evaluation project, researchers…

  6. Experiences of multidisciplinary development team members during user-centered design of telecare products and services: a qualitative study.

    Science.gov (United States)

    Vermeulen, Joan; Verwey, Renée; Hochstenbach, Laura M J; van der Weegen, Sanne; Man, Yan Ping; de Witte, Luc P

    2014-05-19

    User-centered design (UCD) methodologies can help take the needs and requirements of potential end-users into account during the development of innovative telecare products and services. Understanding how members of multidisciplinary development teams experience the UCD process might help to gain insight into factors that members with different backgrounds consider critical during the development of telecare products and services. The primary objective of this study was to explore how members of multidisciplinary development teams experienced the UCD process of telecare products and services. The secondary objective was to identify differences and similarities in the barriers and facilitators they experienced. Twenty-five members of multidisciplinary development teams of four Research and Development (R&D) projects participated in this study. The R&D projects aimed to develop telecare products and services that can support self-management in elderly people or patients with chronic conditions. Seven participants were representatives of end-users (elderly persons or patients with chronic conditions), three were professional end-users (geriatrician and nurses), five were engineers, four were managers (of R&D companies or engineering teams), and six were researchers. All participants were interviewed by a researcher who was not part of their own development team. The following topics were discussed during the interviews: (1) aim of the project, (2) role of the participant, (3) experiences during the development process, (4) points of improvement, and (5) what the project meant to the participant. Experiences of participants related to the following themes: (1) creating a development team, (2) expectations regarding responsibilities and roles, (3) translating user requirements into technical requirements, (4) technical challenges, (5) evaluation of developed products and services, and (6) valorization. Multidisciplinary team members from different backgrounds often

  7. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  8. Intra project team disagreement, conflict communications, and team performance in cross-functional new product teams: A decision-making quality perspective

    Directory of Open Access Journals (Sweden)

    Tsun Jin Chang

    2014-02-01

    Full Text Available This paper develops and examines a model of the antecedents and consequences of decision-making comprehensiveness during the new product development process. This model firstly suggests a concave relationship between intrateam task disagreement and decision-making comprehensiveness. It also conjectures that conflict communications influence the effectiveness of decision-making comprehensiveness on new product teams’ performance. An empirical test of the proposed framework involves a survey of 220 cross-functional new product teams. The findings show that an inverse U-shaped relationship exists between intrateam task disagreement and decision-making comprehensiveness. It also indicates that collaborative communication has a negative effect on innovativeness, whereas contentious communication adversely affects constraint adherence. However, decision-making comprehensiveness partially moderates the relationships between conflict communications and team performance. Some managerial and research implications of the findings were also discussed in this study.

  9. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Evaluation of alternative studies determine what decontamination and decommissioning (D ampersand D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams

  10. Enhancing Mathematical Communication for Virtual Math Teams

    Science.gov (United States)

    Stahl, Gerry; Çakir, Murat Perit; Weimar, Stephen; Weusijana, Baba Kofi; Ou, Jimmy Xiantong

    2010-01-01

    The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT) service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies…

  11. Development and validation of an instrument for measuring the quality of teamwork in teaching teams in postgraduate medical training (TeamQ).

    Science.gov (United States)

    Slootweg, Irene A; Lombarts, Kiki M J M H; Boerebach, Benjamin C M; Heineman, Maas Jan; Scherpbier, Albert J J A; van der Vleuten, Cees P M

    2014-01-01

    Teamwork between clinical teachers is a challenge in postgraduate medical training. Although there are several instruments available for measuring teamwork in health care, none of them are appropriate for teaching teams. The aim of this study is to develop an instrument (TeamQ) for measuring teamwork, to investigate its psychometric properties and to explore how clinical teachers assess their teamwork. To select the items to be included in the TeamQ questionnaire, we conducted a content validation in 2011, using a Delphi procedure in which 40 experts were invited. Next, for pilot testing the preliminary tool, 1446 clinical teachers from 116 teaching teams were requested to complete the TeamQ questionnaire. For data analyses we used statistical strategies: principal component analysis, internal consistency reliability coefficient, and the number of evaluations needed to obtain reliable estimates. Lastly, the median TeamQ scores were calculated for teams to explore the levels of teamwork. In total, 31 experts participated in the Delphi study. In total, 114 teams participated in the TeamQ pilot. The median team response was 7 evaluations per team. The principal component analysis revealed 11 factors; 8 were included. The reliability coefficients of the TeamQ scales ranged from 0.75 to 0.93. The generalizability analysis revealed that 5 to 7 evaluations were needed to obtain internal reliability coefficients of 0.70. In terms of teamwork, the clinical teachers scored residents' empowerment as the highest TeamQ scale and feedback culture as the area that would most benefit from improvement. This study provides initial evidence of the validity of an instrument for measuring teamwork in teaching teams. The high response rates and the low number of evaluations needed for reliably measuring teamwork indicate that TeamQ is feasible for use by teaching teams. Future research could explore the effectiveness of feedback on teamwork in follow up measurements.

  12. Enhancing Mathematical Communication for Virtual Math Teams

    Directory of Open Access Journals (Sweden)

    Gerry Stahl

    2010-06-01

    Full Text Available The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies the online math discourse that takes place during sessions of virtual math teams working on open-ended problem-solving tasks. In particular, it investigates methods of group cognition that are employed by teams in this setting. The VMT environment currently integrates social networking, synchronous text chat, a shared whiteboard for drawing, web browsers and an asynchronous wiki for exchanging findings within the larger community. A simple version of MathML is supported in the whiteboard, chat and wiki for displaying mathematical expressions. The VMT Project is currently integrating the dynamic mathematics application, GeoGebra, into its collaboration environment. This will create a multi-user version of GeoGebra, which can be used in concert with the chat, web browsers, curricular topics and wiki repository.

  13. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  14. Foundations for a Team Oriented Curriculum

    Science.gov (United States)

    Neal, Brandi; Martz, Ben

    2016-01-01

    The business world today values collaboration and team work skills such as those found in the area of project management, business process reengineering, quality circles, etc. In response, the use of group projects permeates many curricula today with varying consequences and levels of success. Technology claims to enhance collaboration in…

  15. Are High Achievers Successful in Collaborative Learning? An Explorative Study of College Students' Learning Approaches in Team Project-Based Learning

    Science.gov (United States)

    Lee, Hye-Jung; Kim, Hyekyung; Byun, Hyunjung

    2017-01-01

    This study analyses how high-achieving students approach team project-based learning (TPBL) and aims to identify the implications and challenges of TPBL practice in higher education. After interviewing 32 high-achieving students and surveying 1022 additional students at a South Korean university, we found that four factors were particularly…

  16. Turbine and Structural Seals Team Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — Seals Team Facilities conceive, develop, and test advanced turbine seal concepts to increase efficiency and durability of turbine engines. Current projects include...

  17. 5 CFR 470.317 - Project evaluation.

    Science.gov (United States)

    2010-01-01

    ... law and/or regulation should be considered or proposed. Where the project plan provides for agency... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration...

  18. Cooperating with a palliative home-care team: expectations and evaluations of GPs and district nurses

    DEFF Research Database (Denmark)

    Goldschmidt, Dorthe; Groenvold, Mogens; Johnsen, Anna Thit

    2005-01-01

    BACKGROUND: Palliative home-care teams often cooperate with general practitioners (GPs) and district nurses. Our aim was to evaluate a palliative home-care team from the viewpoint of GPs and district nurses. METHODS: GPs and district nurses received questionnaires at the start of home-care and one...... month later. Questions focussed on benefits to patients, training issues for professionals and cooperation between the home-care team and the GP/ district nurse. A combination of closed- and open-ended questions was used. RESULTS: Response rate was 84% (467/553). Benefits to patients were experienced...... by 91 %, mainly due to improvement in symptom management, 'security', and accessibility of specialists in palliative care. After one month, 57% of the participants reported to have learnt aspects of palliative care, primarily symptom control, and 89% of them found cooperation satisfactory...

  19. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  20. Team Organization Method Using Salary Auction Game for Sustainable Motivation

    Directory of Open Access Journals (Sweden)

    Sangkyun Kim

    2015-10-01

    Full Text Available In performing team-based projects in engineering class, students usually face many problems, such as free-riding, lack of responsibility, boredom, and insufficient initiative. This papers proposes a new method for performing team-based projects in engineering class—specifically, a gamified method for team organization using a salary auction game. On the description of the design and use of a salary auction game in engineering class, a case study conducted using a survey method is reported to validate the practical value of the proposed auction game. The salary auction game proposed in this paper demonstrates that a gamified team organization method in engineering class could be used as an effective tool to enhance motivation and to improve learning outcomes of engineering students.

  1. Project desk evaluation of a model project CPR/5/009 industrial scale irradiation of rice and other foodstuffs

    International Nuclear Information System (INIS)

    1996-11-01

    The project CPR/5/009 was approved in 1993 as a model project. The project objective was to build an industrial food irradiation facility for high quality rice and other foodstuffs, with a processing capacity of 5000-9000 tonnes per year. This capacity is large compared to many other facilities of the same type elsewhere. The success of the project waste to be measured against the full utilization of the facility with an acceptable availability factor. Disbursements on Agency inputs up to the end of June 1996 were $294,716 and consisted of one 100 kCi Co-60 source, quality control equipment, bag heat sealers, one expert mission and 13.5 months of training abroad. The current budget is $323,870, following two programme changes. The total cost of the project was estimated at $1,331,300 with the Chinese Government providing the balance. The major conclusions of this evaluation are as follows: Initially, the Agency overestimated the project and business management experience of the counterpart, and consequently underestimated the extent of support required. Providing support to counterparts in facing the key challenges of project management and business operation must be considered by the Agency in future projects of this type. The counterpart institution is also encouraged to emphasize these management issues in order to maximize sustainable and cost-effective utilization of such facilities. A new operational plan has been prepared by the counterpart for 1996 through 1998 which identifies seven customers requiring treatment of a total of 1000 tonnes per year of cereal grains and 1500 tonnes per year of other foodstuffs. This plan reflects a change in overall emphasis from supporting food supply security to ensuring the safety of foodstuffs. It is not clear whether this plan will support operation of the facility at full capacity. The team in place to operate the facility also needs further strengthening. (author). Figs, tabs

  2. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  3. The return map: tracking product teams.

    Science.gov (United States)

    House, C H; Price, R L

    1991-01-01

    With a new product, time is now more valuable than money. The costs of conceiving and designing a product are less important to its ultimate success than timeliness to market. One of the most important ways to speed up product development is through interfunctional teamwork. The "Return Map," developed at Hewlett-Packard, provides a way for people from different functions to triangulate on the product development process as a whole. It graphically represents the contributions of all team members to the moment when a project breaks even. It forces the team to estimate and re-estimate the time it will take to perform critical tasks, so that products can get out fast. It subjects the team to the only discipline that works, namely, self-discipline. The map is, in effect, a graph representing time and money, where the time line is divided into three phases: investigation, development, and manufacturing and sales. Meanwhile, costs are plotted against time--as are revenues when they are realized after manufacturing release. Within these points of reference, four novel metrics emerge: Break-Even-Time, Time-to-Market, Break-Even-After-Release, and the Return Factor. All metrics are estimated at the beginning of a project to determine its feasibility, then they are tracked carefully while the project evolves to determine its success. Missed forecasts are inevitable, but managers who punish employees for missing their marks will only encourage them to estimate conservatively, thus building slack into a system meant to eliminate slack. Estimates are a team responsibility, and deviations provide valuable information that spurs continuous investigation and improvement.

  4. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…

  5. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  6. Tiger Team Assessment of the Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    1991-11-01

    This report documents the Tiger Team Assessment of the Los Alamos National Laboratory (LANL) located in Los Alamos, New Mexico. LANL is operated for the US Department of Energy (DOE) by the University of California. The Tiger Team Assessment was conducted from September 23 to November 8, 1991, under the auspices of the DOE Office of Special Projects, Office of Assistant Secretary for Environment, Safety and Health. The assessment was comprehensive, encompassing environmental, safety, and health (ES ampersand H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal LANL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors' management of ES ampersand H/quality assurance programs was conducted. This volume discusses findings concerning the environmental assessment

  7. Measuring cognition in teams: a cross-domain review.

    Science.gov (United States)

    Wildman, Jessica L; Salas, Eduardo; Scott, Charles P R

    2014-08-01

    The purpose of this article is twofold: to provide a critical cross-domain evaluation of team cognition measurement options and to provide novice researchers with practical guidance when selecting a measurement method. A vast selection of measurement approaches exist for measuring team cognition constructs including team mental models, transactive memory systems, team situation awareness, strategic consensus, and cognitive processes. Empirical studies and theoretical articles were reviewed to identify all of the existing approaches for measuring team cognition. These approaches were evaluated based on theoretical perspective assumed, constructs studied, resources required, level of obtrusiveness, internal consistency reliability, and predictive validity. The evaluations suggest that all existing methods are viable options from the point of view of reliability and validity, and that there are potential opportunities for cross-domain use. For example, methods traditionally used only to measure mental models may be useful for examining transactive memory and situation awareness. The selection of team cognition measures requires researchers to answer several key questions regarding the theoretical nature of team cognition and the practical feasibility of each method. We provide novice researchers with guidance regarding how to begin the search for a team cognition measure and suggest several new ideas regarding future measurement research. We provide (1) a broad overview and evaluation of existing team cognition measurement methods, (2) suggestions for new uses of those methods across research domains, and (3) critical guidance for novice researchers looking to measure team cognition.

  8. Who Gets to Lead the Multinational Team?

    DEFF Research Database (Denmark)

    Paunova, Minna

    2017-01-01

    of their core self-evaluations. A study of over 230 individuals from 46 nationalities working in 36 self-managing teams generally supports the expected main and moderation effects. Individual core self-evaluations enhance an otherwise weak effect of English proficiency, but compensate for low levels of national......This article examines the emergence of informal leadership in multinational teams. Building on and extending status characteristics theory, the article proposes and tests a model that describes how global inequalities reproduce in multinational teams, and accounts for who gets to lead these teams...

  9. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  10. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  11. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. Study on team evaluation (6). Relationships among technical skill proficiency, leadership, and teamwork behaviors

    International Nuclear Information System (INIS)

    Misawa, Ryo; Sasou, Kunihide

    2011-01-01

    To maintain and improve the efficiency and safety of operations in numerous industries, it is necessary to develop programs that enhance teamwork. This can be achieved through empirical investigations that identify influential factors contributing to teamwork. This study focused on technical skill proficiency and leadership as influential factors and examined the relationships among these factors and teamwork behaviors. A series of measurements was performed on 54 operations teams with the cooperation of the training center of thermal power plants. Teamwork behaviors in training under simulated abnormal conditions were evaluated through instructors' observation using a behavior checklist. Technical skill proficiency was measured by conducting a brief survey on instructors. Leadership was measured on the basis of followers' responses on questionnaire scales. Based on the scores of technical skill proficiency and leadership, hierarchical cluster analysis revealed three types of teams: (a) F-type - the technical skills of followers are superior to those of leaders; (b) LF-type - both leaders and followers are proficient in technical skills; and (c) L-type - the technical skills of leaders are superior to those of followers. ANOVAs were conducted to examine differences in teamwork behavior for the three types of teams. The main results revealed that LF-type teams actively engaged in information gathering and that leaders played a central role in these activities. In addition, the followers of F-type teams freely exchanged their ideas and opinions regarding problems and actively discussed how to solve them. These findings suggest that teamwork behaviors can vary depending on technical skill proficiency and leadership in teams. Future research is needed to identify additional factors affecting teamwork that are not measured in this study. (author)

  13. Geospace exploration project: Arase (ERG)

    Science.gov (United States)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  14. Evaluation of aviation-based safety team training in a hospital in The Netherlands.

    Science.gov (United States)

    De Korne, Dirk F; Van Wijngaarden, Jeroen D H; Van Dyck, Cathy; Hiddema, U Francis; Klazinga, Niek S

    2014-01-01

    The purpose of this paper is to evaluate the implementation of a broad-scale team resource management (TRM) program on safety culture in a Dutch eye hospital, detailing the program's content and procedures. Aviation-based TRM training is recognized as a useful approach to increase patient safety, but little is known about how it affects safety culture. Pre- and post-assessments of the hospitals' safety culture was based on interviews with ophthalmologists, anesthesiologists, residents, nurses, and support staff. Interim observations were made at training sessions and in daily hospital practice. The program consisted of safety audits of processes and (team) activities, interactive classroom training sessions by aviation experts, a flight simulator session, and video recording of team activities with subsequent feedback. Medical professionals considered aviation experts inspiring role models and respected their non-hierarchical external perspective and focus on medical-technical issues. The post-assessment showed that ophthalmologists and other hospital staff had become increasingly aware of safety issues. The multidisciplinary approach promoted social (team) orientation that replaced the former functionally-oriented culture. The number of reported near-incidents greatly increased; the number of wrong-side surgeries stabilized to a minimum after an initial substantial reduction. The study was observational and the hospital's variety of efforts to improve safety culture prevented us from establishing a causal relation between improvement and any one specific intervention. Aviation-based TRM training can be a useful to stimulate safety culture in hospitals. Safety and quality improvements are not single treatment interventions but complex socio-technical interventions. A multidisciplinary system approach and focus on "team" instead of "profession" seems both necessary and difficult in hospital care.

  15. Leading teaming: Evidence from Jazz

    OpenAIRE

    Araújo, Francisco Maria Trigo da Roza Carvalho

    2013-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics In this research we conducted qualitative analysis to study the team dynamics of jazz combos in order to explore deeper the leadership behaviors in a creative environment where teaming occurs. We found evidence of a dual leader, one that shifts his/her role between ‘leader as leader’ and ‘leader as member’, embracing both leaderfulness an...

  16. Toward a User Driven Innovation for Distributed Software Teams

    Science.gov (United States)

    Hossain, Liaquat; Zhou, David

    The software industry has emerged to include some of the most revolutionized distributed work groups; however, not all such groups achieve their set goals and some even fail miserably. The distributed nature of open source software project teams provides an intriguing context for the study of distributed coordination. OSS team structures have traditionally been geographically dispersed and, therefore, the coordination of post-release activities such as testing are made difficult due to the fact that the only means of communication is via electronic forms, such as e-mail or message boards and forums. Nevertheless, large scale, complex, and innovative software packages have been the fruits of labor for some OSS teams set in such coordination-unfriendly environments, while others end in flames. Why are some distributed work groups more effective than others? In our current communication-enriched environment, best practices for coordination are adopted by all software projects yet some still fall by the wayside. Does the team structure have bearing on the success of the project? How does the communication between the team and external parties affect the project's ultimate success or failure? In this study, we seek to answer these questions by applying existing theories from social networks and their analytical methods in the coordination of defect management activities found in OSS projects. We propose the social network based theoretical model for exploring distributed coordination structures and apply that for the case of the OSS defect management process for exploring the structural properties, which induce the greatest coordination performance. The outcome suggests that there is correlation between certain network measures such as density, centrality, and betweenness and coordination performance measures of defect management systems such as quality and timeliness.

  17. Exploration of Team Integration in Spanish Multifamily Residential Building Construction

    OpenAIRE

    Pellicer, Eugenio; Sanz Benlloch, María Amalia; Esmaeili, B.; MOLENAAR, KEITH ROBERT

    2016-01-01

    Project delivery team integration generally involves early involvement of general contractors and key specialty contractors in the design process. Team integration has been found to improve an owner’s probability of success. However, during difficult economic times, owners can forego early team involvement and move toward low bid procurement to take advantage of competitive markets. This study explores the performance of integrated teams in the Spanish multifamily building constructi...

  18. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  19. Development and Validation of an Instrument for Measuring the Quality of Teamwork in Teaching Teams in Postgraduate Medical Training (TeamQ)

    Science.gov (United States)

    Slootweg, Irene A.; Lombarts, Kiki M. J. M. H.; Boerebach, Benjamin C. M.; Heineman, Maas Jan; Scherpbier, Albert J. J. A.; van der Vleuten, Cees P. M.

    2014-01-01

    Background Teamwork between clinical teachers is a challenge in postgraduate medical training. Although there are several instruments available for measuring teamwork in health care, none of them are appropriate for teaching teams. The aim of this study is to develop an instrument (TeamQ) for measuring teamwork, to investigate its psychometric properties and to explore how clinical teachers assess their teamwork. Method To select the items to be included in the TeamQ questionnaire, we conducted a content validation in 2011, using a Delphi procedure in which 40 experts were invited. Next, for pilot testing the preliminary tool, 1446 clinical teachers from 116 teaching teams were requested to complete the TeamQ questionnaire. For data analyses we used statistical strategies: principal component analysis, internal consistency reliability coefficient, and the number of evaluations needed to obtain reliable estimates. Lastly, the median TeamQ scores were calculated for teams to explore the levels of teamwork. Results In total, 31 experts participated in the Delphi study. In total, 114 teams participated in the TeamQ pilot. The median team response was 7 evaluations per team. The principal component analysis revealed 11 factors; 8 were included. The reliability coefficients of the TeamQ scales ranged from 0.75 to 0.93. The generalizability analysis revealed that 5 to 7 evaluations were needed to obtain internal reliability coefficients of 0.70. In terms of teamwork, the clinical teachers scored residents' empowerment as the highest TeamQ scale and feedback culture as the area that would most benefit from improvement. Conclusions This study provides initial evidence of the validity of an instrument for measuring teamwork in teaching teams. The high response rates and the low number of evaluations needed for reliably measuring teamwork indicate that TeamQ is feasible for use by teaching teams. Future research could explore the effectiveness of feedback on teamwork in

  20. Putting the MeaT into TeaM Training: Development, Delivery, and Evaluation of a Surgical Team-Training Workshop.

    Science.gov (United States)

    Seymour, Neal E; Paige, John T; Arora, Sonal; Fernandez, Gladys L; Aggarwal, Rajesh; Tsuda, Shawn T; Powers, Kinga A; Langlois, Gerard; Stefanidis, Dimitrios

    2016-01-01

    Despite importance to patient care, team training is infrequently used in surgical education. To address this, a workshop was developed by the Association for Surgical Education Simulation Committee to teach team training using high-fidelity patient simulators and the American College of Surgeons-Association of Program Directors in Surgery team-training curriculum. Workshops were conducted at 3 national meetings. Participants completed preworkshop and postworkshop questionnaires to define experience, confidence in using simulation, intention to implement, as well as workshop content quality. The course consisted of (A) a didactic review of Preparation, Implementation, and Debriefing and (B) facilitated small group simulation sessions followed by debriefings. Of 78 participants, 51 completed the workshops. Overall, 65% indicated that residents at their institutions used patient simulation, but only 33% used the American College of Surgeons-the Association of Program Directors in Surgery team-training modules. The workshop increased confidence to implement simulation team training (3.4 ± 1.3 vs 4.5 ± 0.9). Quality and importance were rated highly (5.4 ± 00.6, highest score = 6). Preparation for simulation-based team training is possible in this workshop setting, although the effect on actual implementation remains to be determined. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  1. GEAR UP Aspirations Project Evaluation

    Science.gov (United States)

    Trimble, Brad A.

    2013-01-01

    The purpose of this study was to conduct a formative evaluation of the first two years of the Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP) Aspirations Project (Aspirations) using a Context, Input, Process, and Product (CIPP) model so as to gain an in-depth understanding of the project during the middle school…

  2. Group facilitation: building that winning team.

    Science.gov (United States)

    Krumberger, J M

    1992-12-01

    Team building does not occur by chance; it involves using techniques to make it easier for members to contribute their expertise while working with others to achieve quality results. Evaluation of team effectiveness involves assessing both the processes (team interactions and work processes) and accomplishment of goals (out-comes; see box). Productivity and quality that could not be accomplished by individual efforts may be enhanced by effectively working teams.

  3. The contextualized participative mode of evaluation (CPME applied to “Granada-Employment” project / El modelo de evaluación participativo contextualizado (MEPAC aplicado al proyecto “Granada-Empleo”

    Directory of Open Access Journals (Sweden)

    Margarita Pérez Sánchez

    2013-10-01

    Full Text Available This article presents the evaluation of 2009-2010 “Granada-Employment” Project financed by the European Social Fund and coordinated by the Granada County Council. The evaluation -developed between September of 2010 and July of 2011- was designed by the Departments of Political Science and Public Administration, and Sociology from the University of Granada. This research offers a Contextualized Participative Mode of Evaluation (CPME case study, which is ad hoc designed by the external evaluation team. The summative evaluation of the Project undergoes the main objectives pursed and the measures developed by the programme, and it reveals key points for the territorial pacts future development for employment and actions addressed to improve the job seekers’ labour integration.

  4. Innovative team approach to seal the water inflow at Cigar Lake mine

    International Nuclear Information System (INIS)

    King, C.; Steele, R.; Dixon, B.; Spence, J.; Bazin, K.; Dent, A.; Carreiro, J.; Goddard, G.

    2010-01-01

    'Full text:' In a world where underground mining is more commonly deeper than 5,000 ft., and 8,000-10,000 ft is becoming less extraordinary, new techniques and technologies are in demand to reverse the trend of increasing costs per ton mined. So when a company using their own internal engineering, project and operating resources achieve a true technical first, and moves from concept, through research and development, to successful implementation at the pace of regular production, this is an important event. While the technological details of how the inflow into the flooded Cigar Lake Mine was identified and sealed are tantalising, the value lies in reviewing the repeatability of how to achieve this kind of extraordinary result, which raises people-in-team related questions like; how were they led? How did the working environment get created and sustained that allowed the team to operate in a consistently innovative mindset? How did they maintain a pace that relegated research, development and testing to a pace which is common in a regular operating function? How was the risk of these new techniques and technologies evaluated in a timely and effective manner that was considered normal rather than abnormal, and did not retard the pace of the team progress? If repeatable in regular team project and operating environs, then challenging and improving accepted mining methods, practice and technologies could become the norm rather than the exception. (author)

  5. Tiger Team Assessment of the National Institute for Petroleum and Energy Research

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the Tiger Team Assessment of the National Institute for Petroleum and Energy Research (NIPER) and the Bartlesville Project Office (BPO) of the Department of Energy (DOE), co-located in Bartlesville, Oklahoma. The assessment investigated the status of the environmental, safety, and health (ES ampersand H) programs of the two organizations. The Tiger Team Assessment was conducted from April 6 to May 1, 1992, under the auspices of DOE's Office of Special Projects (OSP) in the Office of the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health issues; management practices; quality assurance; and NIPER and BPO self-assessments. Compliance with Federal, state, and local regulations; DOE Orders; best management practices; and internal IITRI requirements was assessed. In addition, an evaluation was conducted of the adequacy and effectiveness of BPO and IITRI management of the ES ampersand H and self-assessment processes. The NIPER/BPO Tiger Team Assessment is part of a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary with information on the compliance status of DOE facilities with regard to ES ampersand H requirements, root causes for noncompliance, adequacy of DOE and contractor ES ampersand H management programs, response actions to address the identified problem areas, and DOE-wide ES ampersand H compliance trends and root causes

  6. Effect on work ability after team evaluation of functioning regarding pain, self-rated disability, and work ability assessment.

    Science.gov (United States)

    Norrefalk, Jan-Rickard; Littwold-Pöljö, Agneta; Ryhle, Leif; Jansen, Gunilla Brodda

    2010-08-26

    To evaluate the effect of a 1-2 week multiprofessional team assessment, without a real rehabilitation effort, 60 patients suffering from long-standing pain and on long-lasting time on sick leave were studied. A questionnaire concerning their daily activities, quality of life, pain intensity, sick-leave level, and their work state was filled out by all patients before starting the assessment and at a 1-year follow-up. The results from the assessment period and the multiprofessional team decision of the patient's working ability were compared with the actual working rate after 1 year. The follow-up showed a significant reduction of sick leave and a higher level of activity (P work. However, the team evaluation of the patient's work ability did not correlate to predict the actual outcome. The patient's pain intensity, life satisfaction, gender, age, ethnic background, and time absent from work before the start of the evaluation showed no correlation to reduction on time on sickness benefit level. These parameters could not be used as predictors in this study.

  7. Investigating the effects of time pressure on new product development teams

    NARCIS (Netherlands)

    Chong, D.S.F.

    2010-01-01

    The need for innovation has led high-technology organizations to use project teams as the method of choice to bring new products to market under demanding schedules. Adopting a team approach, however, is not always fruitful and often depends on whether team members can work effectively together.

  8. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-10-01

    Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated. This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering. The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging service and multimedia messaging service (SMS & MMS or what some people refer to as ‘texting’, and email were mainly used to share knowledge and were perceived to reduce knowledge transfer time more than voice facilities. Our findings indicate that most students do not utilise the affordances of mobile phones for tacit knowledge transfer. Sharing of tacit knowledge needs to be encouraged

  9. Stakeholder approach for evaluating organizational change projects.

    Science.gov (United States)

    Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri

    2008-01-01

    This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.

  10. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of senior YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.

  11. Professional Team Foundation Server 2012

    CERN Document Server

    Blankenship, Ed; Holliday, Grant; Keller, Brian

    2012-01-01

    A comprehensive guide to using Microsoft Team Foundation Server 2012 Team Foundation Server has become the leading Microsoft productivity tool for software management, and this book covers what developers need to know to use it effectively. Fully revised for the new features of TFS 2012, it provides developers and software project managers with step-by-step instructions and even assists those who are studying for the TFS 2012 certification exam. You'll find a broad overview of TFS, thorough coverage of core functions, a look at extensibility options, and more, written by Microsoft ins

  12. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  13. Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry

    Directory of Open Access Journals (Sweden)

    Odubiyi Tawakalitu Bisola

    2016-12-01

    Full Text Available The rationale behind any construction project varies; it might be to achieve value, time, quality, cost or just satisfaction for the client. Irrespective of any or all of these reasons, the team members involved in conception, inception, construction and delivery of a project are aware that a good teamwork is of essence. This is in the context of growing needs of client and the ever-growing improvement in methods of project delivery as influenced by technology. This article looks into the team type in the Nigerian construction industry from the angle of a virtual team (VT using the mixed-method research design. VT is simply a type of team wherein the members operate from different geographical regions and function majorly with the aid of information and communications technology media. Data for the study were collected from relevant literature, interviews were conducted with 20 selected professionals in the construction industry and, thereafter, a questionnaire was drafted from the results of the interviews and administered to selected relevant professionals. The study revealed that communication among team members, flexibility of operation and decision making are usually the most influencing strengths of the VT, while some of its weaknesses are a need for special training, conflict among team members and client’s acceptance of team type. Reduction in time-to-market, collaboration ability of team members and delivery time of project were seen as opportunities, while recognized threats were members’ performance level and complexity of technical application. The study concludes that the success of the VT depends highly on exploiting the opportunities opened to it.

  14. Developing team leadership to facilitate guideline utilization: planning and evaluating a 3-month intervention strategy.

    Science.gov (United States)

    Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy

    2011-01-01

    Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.

  15. THE DEVELOPMENT OF A MODEL INITIATION OF PROJECT IN A FORM OF MARKOV CHAIN

    Directory of Open Access Journals (Sweden)

    Катерина Вікторівна КОЛЕСНІКОВА

    2017-03-01

    Full Text Available The model of the initiation of projects which reproduces a fragment of the general scheme of interaction between the main entities in the project initiation phase is created. Determined that the project initiation through communication links between the four main entities: projects team, environment, the project itself and the customer. The result of the initiation of projects in the emerging communications referred to objects in the design phase through consistency requirements of stakeholders and the adoption of the basic concepts of projects, goal-projects, project planning, evaluation requirements of specialization and competence required for the formation of the project team. This Markov chain is part of the control circuit that includes elements such as the temporary organizational structure of the project design, project team, customer, and environment project. It is shown that the Markov model of interaction between project participants in their initiation phase, taking into account the role of a key player in the project ‑ the customer can determine changes of state and generate recommendations for initiating projects. Results of the study can serve as a basis for creating models of control objects that contain its organizational structure and reflect the parametric properties of the system to obtain information needed for decision making to initiate projects

  16. Team skills training

    International Nuclear Information System (INIS)

    Coe, R.P.; Carl, D.R.

    1991-01-01

    Numerous reports and articles have been written recently on the importance of team skills training for nuclear reactor operators, but little has appeared on the practical application of this theoretical guidance. This paper describes the activities of the Training and Education Department at GPU Nuclear (GPUN). In 1987, GPUN undertook a significant initiative in its licensed operator training programs to design and develop initial and requalification team skills training. Prior to that time, human interaction skills training (communication, stress management, supervisory skills, etc.) focused more on the individual rather than a group. Today, GPU Nuclear conducts team training at both its Three Mile Island (YMI), PA and Oyster Creek (OC), NJ generating stations. Videotaped feedback is sued extensively to critique and reinforce targeted behaviors. In fact, the TMI simulator trainer has a built-in, four camera system specifically designed for team training. Evaluations conducted on this training indicated these newly acquired skills are being carried over to the work environment. Team training is now an important and on-going part of GPUN operator training

  17. Intelligent Virtual Assistant's Impact on Technical Proficiency within Virtual Teams

    Science.gov (United States)

    Graham, Christian; Jones, Nory B.

    2016-01-01

    Information-systems development continues to be a difficult process, particularly for virtual teams that do not have the luxury of meeting face-to-face. The research literature on this topic reinforces this point: the greater part of database systems development projects ends in failure. The use of virtual teams to complete projects further…

  18. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  19. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  20. The Delta Cooperative Model: a Dynamic and Innovative Team-Work Activity to Develop Research Skills in Microbiology

    Directory of Open Access Journals (Sweden)

    Ivan Baez-Santos

    2006-12-01

    Full Text Available The Delta Cooperative Model (DCM is a dynamic and innovative teamwork design created to develop fundamentals in research skills. High school students in the DCM belong to the Upward Bound Science and Math (UBSM program at the Inter American University, Ponce Campus. After workshops on using the scientific method, students were organized into groups of three students with similar research interests. Each student had to take on a role within the group as either a researcher, data analyst, or research editor. Initially, each research team developed hypothesis-driven ideas on their proposed project. In intrateam research meetings, they emphasized team-specific tasks. Next, interteam meetings were held to present ideas and receive critical input. Finally, oral and poster research presentations were conducted at the UBSM science fair. Several team research projects covered topics in medical, environmental, and general microbiology. The three major assessment areas for the workshop and DCM included: (i student’s perception of the workshops’ effectiveness in developing skills, content, and values; (ii research team self- and group participation evaluation, and (iii oral and poster presentation during the science fair. More than 91% of the students considered the workshops effective in the presentation of scientific method fundamentals. The combination of the workshop and the DCM increased student’s knowledge by 55% from pre- to posttests. Two rubrics were designed to assess the oral presentation and poster set-up. The poster and oral presentation scores averaged 83%and 75%respectively. Finally, we present a team assessment instrument that allows the self- and group evaluation of each research team. While the DCM has educational plasticity and versatility, here we document how this model has been successfully incorporated in training and engaging students in scientific research in microbiology.

  1. The Delta Cooperative Model: a Dynamic and Innovative Team-Work Activity to Develop Research Skills in Microbiology

    Directory of Open Access Journals (Sweden)

    Carlos Rios-Velazquez

    2009-12-01

    Full Text Available The Delta Cooperative Model (DCM is a dynamic and innovative teamwork design created to develop fundamentals in research skills. High school students in the DCM belong to the Upward Bound Science and Math (UBSM program at the Inter American University, Ponce Campus. After workshops on using the scientific method, students were organized into groups of three students with similar research interests. Each student had to take on a role within the group as either a researcher, data analyst, or research editor. Initially, each research team developed hypothesis-driven ideas on their proposed project. In intrateam research meetings, they emphasized team-specific tasks. Next, interteam meetings were held to present ideas and receive critical input. Finally, oral and poster research presentations were conducted at the UBSM science fair. Several team research projects covered topics in medical, environmental, and general microbiology. The three major assessment areas for the workshop and DCM included: (i student’s perception of the workshops’ effectiveness in developing skills, content, and values; (ii research team self- and group participation evaluation, and (iii oral and poster presentation during the science fair. More than 91% of the students considered the workshops effective in the presentation of scientific method fundamentals. The combination of the workshop and the DCM increased student’s knowledge by 55% from pre- to posttests. Two rubrics were designed to assess the oral presentation and poster set-up. The poster and oral presentation scores averaged 83%and 75%respectively. Finally, we present a team assessment instrument that allows the self- and group evaluation of each research team. While the DCM has educational plasticity and versatility, here we document how this model has been successfully incorporated in training and engaging students in scientific research in microbiology.

  2. AA magnet measurement team

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    Quickly improvised measurement equipment for the AA (Antiproton Accumulator) was all the tight schedule permitted, but the high motivation of the team made up for the lack of convenience. From left to right: Roy Billinge (Joint AA Project Leader, the other one was Simon van der Meer); Bruno Autin, Brian Pincott, Colin Johnson.

  3. Project SEARCH UK--Evaluating Its Employment Outcomes

    Science.gov (United States)

    Kaehne, Axel

    2016-01-01

    Background: The study reports the findings of an evaluation of Project SEARCH UK. The programme develops internships for young people with intellectual disabilities who are about to leave school or college. The aim of the evaluation was to investigate at what rate Project SEARCH provided employment opportunities to participants. Methods: The…

  4. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  5. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR-06 are highlighted, and the future of the two projects is discussed

  6. Improving collaborative work and project management in a nuclear power plant design team: A human-centered design approach

    International Nuclear Information System (INIS)

    Boy, Guy André; Jani, Gopal; Manera, Annalisa; Memmott, Matthew; Petrovic, Bojan; Rayad, Yassine; Stephane, Lucas; Suri, Neha

    2016-01-01

    This article presents a collaborative system, called SCORE, useful for a multi-disciplinary team designing a new nuclear power plant (NPP). It was developed during the first phase of the I 2 S-LWR project (Integral Inherently Safe Light Water Reactor). SCORE enables the generation of design cards (DCs). A DC includes four main spaces (Boy, 2005): (1) a rationalization space where the various components of the system being designed (SBD) are described in terms of design rationale, integration and requirements; this space includes declarative and procedural descriptions and statements; (2) an activity space where the current version of the SBD is displayed; it includes static and dynamic features; this space enables SBD manipulation; (3) a structure space where the various components and their inter-relations are formally and declaratively described as systems of systems; (4) a function space where the various functions of the SBD are described in terms of procedural knowledge and dynamic processes involved; this space includes qualitative and quantitative physical and cognitive models. The rationalization space is informed using an adapted version of the QOC method (Questions, Options, Criteria), which was tested within the I 2 S-LWR design team. The activity space contains 3D models developed using AutoDesk Inventor, and transferred into the Unity game engine web player in order to facilitate integration within the DC spaces and enable intuitive manipulation of objects in the activity space. Two additional spaces were added: an instant messaging capability that allows design team members (DTMs) to exchange with one another on a DC; and a structured evaluation space. DCs are cooperatively created and refined by DTMs, and synthesized during periodic design meetings, the frequency of which may vary. Incrementally combining abstract explanations of designed elements and integration with their explicit visual representation improves mutual understanding among DTMs, and

  7. Documentation assessment, Project C-018H, 200-E area effluent treatment facility

    International Nuclear Information System (INIS)

    Peres, M.W.; Connor, M.D.; Mertelendy, J.I.

    1994-01-01

    Project C-018H is one of the fourteen subprojects to the Hanford Environmental Compliance (HEC) Project. Project C-018H provides treatment and disposal for the 242-A Evaporator and PUREX plant process condensate waste streams. This project used the Integrated Management Team (IMT) approach proposed by RL. The IMT approach included all affected organizations on the project team to coordinate and execute all required project tasks, while striving to integrate and satisfy all technical, operational, functional, and organizational objectives. The HEC Projects were initiated in 1989. Project C-018H began in early 1990, with completion of construction currently targeted for mid-1995. This assessment was performed to evaluate the effectiveness of the management control on design documents and quality assurance records developed and submitted for processing, use, and retention for the Project. The assessment focused primarily on the overall adequacy and quality of the design documentation currently being submitted to the project document control function

  8. Experimental Evaluation of Instructional Consultation Teams on Teacher Beliefs and Practices

    Science.gov (United States)

    Vu, Phuong; Shanahan, Katherine Bruckman; Rosenfield, Sylvia; Gravois, Todd; Koehler, Jessica; Kaiser, Lauren; Berger, Jill; Vaganek, Megan; Gottfredson, Gary D.; Nelson, Deborah

    2013-01-01

    Instructional Consultation Teams (IC Teams) are an early intervention service intended to support teachers in working with struggling students. This is a large-scale experimental trial investigating the effects of IC Teams on teacher efficacy, instructional practices, collaboration, and job satisfaction. Public elementary schools (N = 34) were…

  9. A Method for Knowledge Management and Communication Within and Across Multidisciplinary Teams

    Directory of Open Access Journals (Sweden)

    Don Flynn

    2009-06-01

    Full Text Available The use of knowledge management (KM and communication tools in an applied scientific arena where research is performed and knowledge must be managed within and across multidisciplinary teams and organizations is a challenge. Teams of scientists and engineers from up to 17 different technical specialties required knowledge management tools for developing multiple environmental impact statements under challenging circumstances. Factors that contributed to the success of the KM tools included 1 pairing of project staff with Knowledge Systems staff to determine system requirements, 2 the use of the tools by the team as they were being developed thus allowing many opportunities for feedback and interaction, 3 developing the tools to approximate the overall project structure and work flow already in place, 4 providing immediate assistance to the project team as they learned to use the new KM tools, and 5 replacing earlier practices with the new KM approach by "burning the bridges" to past practices after the team had learned to use the new KM tools.

  10. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  11. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  12. CROSS: A GDSS for the Evaluation and Prioritization of Engineering Support Requests and Advanced Technology Projects at NASA

    Science.gov (United States)

    Tavana, Madjid; Lee, Seunghee

    1996-01-01

    Objective evaluation and prioritization of engineering support requests (ESRs) is a difficult task at the Kennedy Space Center (KSC) Shuttle Project Engineering Office. The difficulty arises from the complexities inherent in the evaluation process and the lack of structured information. The purpose of this project is to implement the consensus ranking organizational support system (CROSS), a multiple criteria decision support system (DSS) developed at KSC that captures the decision maker's beliefs through a series of sequential, rational, and analytical processes. CROSS utilizes the analytic hierarchy process (AHP), subjective probabilities, entropy concept, and maximize agreement heuristic (MAH) to enhance the decision maker's intuition in evaluation ESRs. Some of the preliminary goals of the project are to: (1) revisit the structure of the ground systems working team (GWST) steering committee, (2) develop a template for ESR originators to provide more comple and consistent information to the GSWT steering committee members to eliminate the need for a facilitator, (3) develop an objective and structured process for the initial screening of ESRs, (4) extensive training of the stakeholders and the GWST steering committee to eliminate the need for a facilitator, (5) automate the process as much as possible, (6) create an environment to compile project success factor data on ESRs and move towards a disciplined system that could be used to address supportability threshold issues at the KSC, and (7) investigate the possibility of an organization-wide implementation of CROSS.

  13. Team incentives in relational contracts

    International Nuclear Information System (INIS)

    Kvaloey, Ola

    2003-01-01

    Incentive schemes for teams are compared. I ask: under which conditions are relational incentive contracts based on joint performance evaluation, relative performance evaluation and independent performance evaluation self-enforceable. The framework of Che and Yoo (2001) on team incentives is combined with the framework of Baker, Gibbons and Murphy (2002) on relational contracts. In a repeated game between one principal and two agents, I find that incentives based on relative or independent performance are expected to dominate when the productivity of effort is high, while joint performance evaluation dominates when productivity is low. Incentives based on independent performance are more probable if the agents own critical assets. (author)

  14. The Team Climate Inventory as a Measure of Primary Care Teams' Processes: Validation of the French Version

    OpenAIRE

    Beaulieu, Marie-Dominique; Dragieva, Nataliya; Del Grande, Claudio; Dawson, Jeremy; Haggerty, Jeannie L.; Barnsley, Jan; Hogg, William E.; Tousignant, Pierre; West, Michael A.

    2014-01-01

    Purpose: Evaluate the psychometric properties of the French version of the short 19-item Team Climate Inventory (TCI) and explore the contributions of individual and organizational characteristics to perceived team effectiveness.

  15. Advanced engineering environment collaboration project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-12-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

  16. Advanced engineering environment collaboration project

    International Nuclear Information System (INIS)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-01-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications

  17. Criticality safety benchmark evaluation project: Recovering the past

    Energy Technology Data Exchange (ETDEWEB)

    Trumble, E.F.

    1997-06-01

    A very brief summary of the Criticality Safety Benchmark Evaluation Project of the Westinghouse Savannah River Company is provided in this paper. The purpose of the project is to provide a source of evaluated criticality safety experiments in an easily usable format. Another project goal is to search for any experiments that may have been lost or contain discrepancies, and to determine if they can be used. Results of evaluated experiments are being published as US DOE handbooks.

  18. Development of a quantitative evaluation method for non-technical skills preparedness of operation teams in nuclear power plants to deal with emergency conditions

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, Ar Ryum; Seong, Poong Hyun

    2013-01-01

    Highlights: ► We selected important non-technical skills for emergency conditions in NPPs. ► We proposed an evaluation method for the selected non-technical skills. ► We conducted two sets of training, 9 experiments each, with real plant operators. ► Teams showed consistent non-technical skills preparedness with changing scenarios. ► Non-technical skills preparedness gives plausible explanations why teams fail tasks. -- Abstract: Many statistical results from safety reports tell that human related errors are the dominant influencing factor on the safe operation of power plants. Fortunately, training operators for the technical and non-technical skills can prevent many types of human errors. In this study, four important non-technical skills in safety critical industries – medical, aviation, and nuclear – were selected to describe behaviors of operation teams in emergency conditions of nuclear power plants (NPPs): communication, leadership, situation awareness, and decision-making skills. Also, preparedness of the non-technical skills was defined, and a quantification method of those skills called NoT-SkiP (Non-Technical Skills Preparedness) was developed to represent ‘how well operation teams are prepared to deal with emergency conditions’ in the non-technical skills aspect by analyzing monitoring-control patterns and a verbal protocol. Two case studies were conducted to validate the method. The first case was applied to Loss of Coolant Accident (LOCA) and Steam Generator Tube Rupture (SGTR) training. Independent variables were scenario, training repetition, and members. Relative values of the NoT-SkiP showed a consistent trend with changing scenarios. However, when training was repeated with the same scenario, NoT-SkiP values of some team were changed. It was supposed that leaders of some teams exerted their knowledge acquired from the previous training and gave up thoroughness of using procedures. When members especially who play a dominant role

  19. Development of a quantitative evaluation method for non-technical skills preparedness of operation teams in nuclear power plants to deal with emergency conditions

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, Ar Ryum [Department of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Seong, Poong Hyun, E-mail: phseong@kaist.ac.kr [Department of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, 373-1, Guseong-dong, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2013-02-15

    Highlights: ► We selected important non-technical skills for emergency conditions in NPPs. ► We proposed an evaluation method for the selected non-technical skills. ► We conducted two sets of training, 9 experiments each, with real plant operators. ► Teams showed consistent non-technical skills preparedness with changing scenarios. ► Non-technical skills preparedness gives plausible explanations why teams fail tasks. -- Abstract: Many statistical results from safety reports tell that human related errors are the dominant influencing factor on the safe operation of power plants. Fortunately, training operators for the technical and non-technical skills can prevent many types of human errors. In this study, four important non-technical skills in safety critical industries – medical, aviation, and nuclear – were selected to describe behaviors of operation teams in emergency conditions of nuclear power plants (NPPs): communication, leadership, situation awareness, and decision-making skills. Also, preparedness of the non-technical skills was defined, and a quantification method of those skills called NoT-SkiP (Non-Technical Skills Preparedness) was developed to represent ‘how well operation teams are prepared to deal with emergency conditions’ in the non-technical skills aspect by analyzing monitoring-control patterns and a verbal protocol. Two case studies were conducted to validate the method. The first case was applied to Loss of Coolant Accident (LOCA) and Steam Generator Tube Rupture (SGTR) training. Independent variables were scenario, training repetition, and members. Relative values of the NoT-SkiP showed a consistent trend with changing scenarios. However, when training was repeated with the same scenario, NoT-SkiP values of some team were changed. It was supposed that leaders of some teams exerted their knowledge acquired from the previous training and gave up thoroughness of using procedures. When members especially who play a dominant role

  20. Shared Leadership Improves Team Novelty: The Mechanism and Its Boundary Condition

    Science.gov (United States)

    Sun, Xiaomin; Jie, Yuan; Wang, Yilu; Xue, Gang; Liu, Yan

    2016-01-01

    Previous research has revealed the significant impact of shared leadership on team creativity, yet the mechanism underlying this relationship has rarely been investigated. The current research examined how shared leadership influenced team creativity (novelty and usefulness) across 3 studies using both long-term project teams and temporal task teams in the laboratory. The results showed that shared leadership enhanced the novelty dimension of team creativity by improving constructive controversy. Furthermore, team goal orientation moderated this effect. The indirect effect of constructive controversy holds for teams with learning goal orientation but not for those with performance goal orientation. Such patterns were not found in the usefulness dimension of team creativity. PMID:28066289

  1. Team Sport in the Workplace? A RE-AIM Process Evaluation of ‘Changing the Game’

    Directory of Open Access Journals (Sweden)

    Andrew Brinkley

    2017-10-01

    Full Text Available Background: The workplace is a priority setting to promote health. Team sports can be an effective way to promote both physical and social health. This study evaluated the potential enablers and barriers for outcomes of a workplace team sports intervention programme‘Changing the Game’ (CTG. This study was conducted in a FTSE 100 services organisation. This process evaluation was conducted using the RE-AIM framework. Methods: A mixed methods approach was used. Data were collected from the participants in the intervention group prior to, during and at the end of the intervention using interviews (n = 12, a focus group (n = 5, and questionnaires (n = 17. Organisational documentation was collected, and a research diary was recorded by the lead author. The evidence collected was triangulated to examine the reach, efficacy, adoption, implementation and maintenance of the programme. Data was assessed through template analysis, and questionnaire data were analysed using multiple regression and a series of univariate ANOVAs. Results: CTG improved VO2 Max, interpersonal communication, and physical activity behaviour (efficacy over 12-weeks. This may be attributed to the supportive approach adopted within the design and delivery of the programme (implementation. Individual and organisational factors challenged the adoption and maintenance of the intervention. The recruitment and communication strategy limited the number of employees the programme could reach. Conclusion: The process evaluation suggests addressing the culture within workplaces may better support the reach, adoption and maintenance of workplace team sport programmes. Future research should consider investigating and applying these findings across a range of industries and sectors.

  2. The Benefits of Team Teaching.

    Science.gov (United States)

    Morganti, Deena J.; Buckalew, Flora C.

    1991-01-01

    Discussion of team teaching focuses on librarians team teaching a course on information search strategy at the Pennsylvania State Berks Campus Library. Course requirements are described, planning for the course is discussed, grading practices are reviewed, and course and instructor evaluations are described. (two references) (LRW)

  3. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-03-01

    Full Text Available Group learning plays a key role in the transfer of knowledge. In institutions of learning, it enhances students’ understanding, critical thinking, integration of knowledge and knowledge sharing. However, the transfer of knowledge in group projects is often impeded by factors such as time and budget constraints, individual and social barriers, and a lack of motivation.Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated.This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering.The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging

  4. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  5. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  6. Tiger Team Assessment of the Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1992-06-01

    This draft report documents the Tiger Team Assessment of the Fermi National Accelerator Laboratory (Fermilab) located in Batavia, Illinois. Fermilab is a program-dedicated national laboratory managed by the Universities Research Association, Inc. (URA) for the US Department of Energy (DOE). The Tiger Team Assessment was conducted from May 11 to June 8, 1992, under the auspices of DOE's Office of Special Projects (OSP) under the Office of the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety and health (ES ampersand H), and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal , State of Illinois, and local regulations; applicable DOE Orders; best management practices; and internal Fermilab requirements was addressed. In addition, an evaluation of the effectiveness of DOE and Fermilab management of the ES ampersand H/QA and self-assessment programs was conducted. The Fermilab Tiger Team Assessment is part a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary of Energy with information on the compliance status of DOE facilities with regard to ES ampersand H requirements, root causes for noncompliance, adequacy of DOE and contractor ES ampersand H management programs, response actions to address the identified problem areas, and DOE-wide ES ampersand H compliance trends and root causes

  7. Workforce development and effective evaluation of projects.

    Science.gov (United States)

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  8. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  9. Development of Nuclear Safety Culture evaluation method for an operation team based on the probabilistic approach

    International Nuclear Information System (INIS)

    Han, Sang Min; Lee, Seung Min; Yim, Ho Bin; Seong, Poong Hyun

    2018-01-01

    Highlights: •We proposed a Probabilistic Safety Culture Healthiness Evaluation Method. •Positive relationship between the ‘success’ states of NSC and performance was shown. •The state probability profile showed a unique ratio regardless of the scenarios. •Cutset analysis provided not only root causes but also the latent causes of failures. •Pro-SCHEMe was found to be applicable to Korea NPPs. -- Abstract: The aim of this study is to propose a new quantitative evaluation method for Nuclear Safety Culture (NSC) in Nuclear Power Plant (NPP) operation teams based on the probabilistic approach. Various NSC evaluation methods have been developed, and the Korea NPP utility company has conducted the NSC assessment according to international practice. However, most of methods are conducted by interviews, observations, and the self-assessment. Consequently, the results are often qualitative, subjective, and mainly dependent on evaluator’s judgement, so the assessment results can be interpreted from different perspectives. To resolve limitations of present evaluation methods, the concept of Safety Culture Healthiness was suggested to produce quantitative results and provide faster evaluation process. This paper presents Probabilistic Safety Culture Healthiness Evaluation Method (Pro-SCHEMe) to generate quantitative inputs for Human Reliability Assessment (HRA) in Probabilistic Safety Assessment (PSA). Evaluation items which correspond to a basic event in PSA are derived in the first part of the paper through the literature survey; mostly from nuclear-related organizations such as the International Atomic Energy Agency (IAEA), the United States Nuclear Regulatory Commission (U.S.NRC), and the Institute of Nuclear Power Operations (INPO). Event trees (ETs) and fault trees (FTs) are devised to apply evaluation items to PSA based on the relationships among such items. The Modeling Guidelines are also suggested to classify and calculate NSC characteristics of

  10. Equitable Financial Evaluation Method for Public-Private Partnership Projects

    Institute of Scientific and Technical Information of China (English)

    KE Yongjian; LIU Xinping; WANG Shouqing

    2008-01-01

    The feasibility study of a public-private partnership (PPP) project is regarded as one of the critical factors for successful implementation,but unfortunately the common financial evaluation methods currently used only represent the benefits of the private sector.There is,therefore,an urgent need to develop an equitable financial evaluation method for PPP projects.This paper presents a comprehensive literature review that examines international practices.An equitable financial evaluation method was then developed taking into account the inherent characteristics of PPP projects using six separate indicators and Monte Carlo simulations.The result for a bridge project in Romania shows that the method combines the viewpoints of all the relevant stakeholders to achieve an equitable financial evaluation of PPP projects.

  11. Implementation of team training in medical education in Denmark

    DEFF Research Database (Denmark)

    Østergaard, H T; Østergaard, Ditte; Lippert, A

    2008-01-01

    In the field of medicine, team training aiming at improving team skills such as leadership, communication, co-operation, and followership at the individual and the team level seems to reduce risk of serious events and therefore increase patient safety. The preferred educational method for this type...... of training is simulation. Team training is not, however, used routinely in the hospital. In this paper, we describe a framework for the development of a team training course based on need assessment, learning objectives, educational methods including full-scale simulation and evaluations strategies. The use...... of this framework is illustrated by the present multiprofessional team training in advanced cardiac life support, trauma team training and neonatal resuscitation in Denmark. The challenges of addressing all aspects of team skills, the education of the facilitators, and establishment of evaluation strategies...

  12. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  13. CAUSE AND EFFECT IN PROMOTING A PROJECT

    Directory of Open Access Journals (Sweden)

    SEVERIAN-VLĂDUȚ IACOB

    2013-12-01

    Full Text Available For a project to be considered successful it is necessary, besides a proper coordination, to be also done a good and wide promotion. In view of communication, promotion and maintenance ensures the organization's image. Disturbances occurring in any type of project, as a result of poor promotion, affect the image of the team and highlight the weaknesses in its management. Therefore, the promotion should be permanently monitored and evaluated. Cause-effect analysis is one of the ways we can identify some of nonconformities of the promotion process within a project.

  14. A Systematic Review of Developing Team Competencies in Information Systems Education

    Science.gov (United States)

    Figl, Kathrin

    2010-01-01

    The ability to work effectively in teams has been a key competence for information systems engineers for a long time. Gradually, more attention is being paid to developing this generic competence as part of academic curricula, resulting in two questions: how to best promote team competencies and how to implement team projects successfully. These…

  15. Developing Expert Teams with a Strong Safety Culture

    Science.gov (United States)

    Rogers, David G.

    2010-01-01

    Would you like to lead a world renowned team that draws out all the talents and expertise of its members and consistently out performs all others in the industry? Ever wonder why so many organizations fail to truly learn from past mistakes only to repeat the same ones at a later date? Are you a program/project manager or team member in a high-risk organization where the decisions made often carry the highest of consequences? Leadership, communication, team building, critical decision-making and continuous team improvement skills and behaviors are mere talking points without the attitudes, commitment and strategies necessary to make them the very fabric of a team. Developing Expert Teams with a Strong Safety Culture, will provide you with proven knowledge and strategies to take your team soaring to heights you may have not thought possible. A myriad of teams have applied these strategies and techniques within their organization team environments: military and commercial aviation, astronaut flight crews, Shuttle flight controllers, members of the Space Shuttle Program Mission Management Team, air traffic controllers, nuclear power control teams, surgical teams, and the fire service report having spectacular success. Many industry leaders are beginning to realize that although the circumstances and environments of these teams may differ greatly to their own, the core elements, governing principles and dynamics involved in managing and building a stellar safety conscious team remain identical.

  16. Reflecting Team as an Evaluation/learning Instrument for Self-reflection of Teachers

    Directory of Open Access Journals (Sweden)

    Michling Malgorzata D.

    2017-12-01

    Full Text Available The Reflecting Team (RT is a method derived from systemic therapy in the 1980s by the social psychiatrist Tom Andersen. It is increasingly being used in training and evaluation contexts. The aim of the method is to create a space for the development of diverse perspectives and appropriate ideas and solutions in which the integrity of the students/customers/clients is preserved and the acceptance of proposals is facilitated. To this end, the systems involved (advice seekers, consultants, and observers enter a common process of alternately directed and non-directed communication. The RT is not only suitable to address communication problems in group work and other educational situations, but it can also help to consider the traditional teaching and learning processes in a reflective way. Reflecting teams can also significantly improve the feedback and quality of teaching and learning. The article deals with the use of RT in the context of the collective exchange of teaching staff with their students. It uses a problem as an evaluation form and learning instrument to reflect on their pedagogical approach and, at the same time, their relationship with students during the lessons. This is to present the RT method for collegial exchange (Process Flow: Advice-seeker, teacher, Interviewer, RT and their need for teacher reflection as well as the experience of self-efficacy (empowerment and self-sufficiency.

  17. Peer mentored teams to support undergraduate group work in higher education

    Science.gov (United States)

    Cinderey, Lynn Elizabeth

    This research starts with a set of practical research questions to investigate a problem which occurs in some computing undergraduate modules that use group work as part of the learning and assessment strategy. In this study final year students with experience in information systems project work and trained in team processes met with small groups of first year computing students with the aim of turning the first year project group into a team. This study seeks to explore the experience of the final year students as they take on the role of peer tutor looking at the problems they perceive within the first year teams and the skills and knowledge they use to help them. The study includes the recruitment and training of final year students (n=9) and allocation to first year teams. The final year students acted as co-researchers and team leaders in L4 Information Systems project work and recorded their thoughts and observations in a diary during the first semester of 2008/9 academic year. Diary data was supplemented by interview data from a sample of final year students (n=4). The sample was selected based on the richness of the data provided in the diaries and the number of meetings held with their teams. Rich data and thick descriptions were essential for a phenomenological examination of the experience of the final year students. A number of findings emerged. A critical approach to analysis revealed ongoing conflicts occurred across cultural divides within the first year teams that final year leaders did not articulate or appear fully aware of. This had important implications for individual team members. Other findings which relate to issues of changing levels of motivation in the teams over the ten weeks, roles adopted by the leaders, ability to systematize the project or team processes and the ability to reflect on unsuccessful strategies also had implications for peer mentoring training and support. The picture that emerged from the data suggested that lack of

  18. Solving challenges in inter- and trans-disciplinary working teams: Lessons from the surgical technology field.

    Science.gov (United States)

    Korb, Werner; Geißler, Norman; Strauß, Gero

    2015-03-01

    Engineering a medical technology is a complex process, therefore it is important to include experts from different scientific fields. This is particularly true for the development of surgical technology, where the relevant scientific fields are surgery (medicine) and engineering (electrical engineering, mechanical engineering, computer science, etc.). Furthermore, the scientific field of human factors is important to ensure that a surgical technology is indeed functional, process-oriented, effective, efficient as well as user- and patient-oriented. Working in such trans- and inter-disciplinary teams can be challenging due to different working cultures. The intention of this paper is to propose an innovative cooperative working culture for the interdisciplinary field of computer-assisted surgery (CAS) based on more than ten years of research on the one hand and the interdisciplinary literature on working cultures and various organizational theories on the other hand. In this paper, a retrospective analysis of more than ten years of research work in inter- and trans-disciplinary teams in the field of CAS will be performed. This analysis is based on the documented observations of the authors, the study reports, protocols, lab reports and published publications. To additionally evaluate the scientific experience in an interdisciplinary research team, a literature analysis regarding scientific literature on trans- and inter-disciplinarity was performed. Own research and literature analyses were compared. Both the literature and the scientific experience in an interdisciplinary research team show that consensus finding is not always easy. It is, however, important to start trans- and interdisciplinary projects with a shared mental model and common goals, which include communication and leadership issues within the project teams, i.e. clear and unambiguous information about the individual responsibilities and objectives to attain. This is made necessary due to differing

  19. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  20. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  1. Introducing a New Concept Inventory on Climate Change to Support Undergraduate Instruction, Teacher Education, Education Research, and Project Evaluation (Invited)

    Science.gov (United States)

    Morrow, C. A.; Monsaas, J.; Katzenberger, J.; Afolabi, C. Y.

    2013-12-01

    The Concept Inventory on Climate Change (CICC) is a new research-based, multiple-choice 'test' that provides a powerful new assessment tool for undergraduate instructors, teacher educators, education researchers, and project evaluators. This presentation will describe the features and the development process of the (CICC). This includes insights about how the development team (co-authors) integrated and augmented their multi-disciplinary expertise. The CICC has been developed in the context of a popular introductory undergraduate weather and climate course at a southeastern research university (N~400-500 per semester). The CICC is not a test for a grade, but is intended to be a useful measure of how well a given teaching and learning experience has succeeded in improving understanding about climate change and related climate concepts. The science content addressed by the CICC is rooted in the national consensus document, 'Climate Literacy: The Essential Principles of Climate Science'. The CICC has been designed to support undergraduate instruction, and may be valuable in comparable contexts that teach about climate change. CICC results can help to inform decisions about the effectiveness of teaching strategies by 1) flagging conceptual issues (PRE-instruction); and 2) detecting conceptual change (POST-instruction). Specific CICC items and their answer choices are informed by the research literature on common misunderstandings about climate and climate change. Each CICC item is rated on a 3-tier scale of the cognitive sophistication the item is calling for, and there is a balance among all three tiers across the full instrument. The CICC development process has involved data-driven changes to successive versions. Data sources have included item statistics from the administration of progressively evolved versions of the CICC in the weather and climate course, group interviews with students, and expert review by climate scientists, educators, and project evaluators

  2. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  3. Hearing Conservation Team

    Data.gov (United States)

    Federal Laboratory Consortium — The Hearing Conservation Team focuses on ways to identify the early stages of noise-induced damage to the human ear.Our current research involves the evaluation of...

  4. Team Danmarks støttekoncept

    DEFF Research Database (Denmark)

    Storm, Rasmus K.

    Evaluering af Team Danmarks støttekoncept 2005-2008 med omfattende analyser af Team Danmarks virke, dets støttekoncept og de samarbejdsrelationer med specialforbund, udøvere, politisk valgte ledere, trænere mv., som udmøntningen af støttekonceptet forudsætter. Herunder analyse af...

  5. The Mental Health Team: Evaluation From a Professional Viewpoint. A Qualitative Study.

    Science.gov (United States)

    Pileño, María Elena; Morillo, Javier; Morillo, Andrea; Losa-Iglesias, Marta

    2018-04-01

    Health care institutions include workers who must operate in accordance with the requirements of the position, even though there are psychosocial influences that can affect the stability of the worker. To analyze the organizational culture of the team of professionals who work in the mental health network. A qualitative methodology was used to assess a sample of 55 mental health professionals who have been practicing for at least 5years. "Team" was the overall topic. The subtopics within "Team" were: getting along in the unit, getting along with the patient, personal resources for dealing with patients, adaptive resources of team members and, resources that the team uses in their group activities. It was observed that the team does not work with a common objective and needs an accepted leader to manage the group. The definition and acceptance of roles can result in conflict. By increasing the skill level of each worker, the multidisciplinary team would be more collaborative. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Perturbed Communication in a Virtual Environment to Train Medical Team Leaders

    OpenAIRE

    Huguet , Lauriane; Lourdeaux , Domitile; Sabouret , Nicolas; Ferrer , Marie-Hélène

    2016-01-01

    International audience; The VICTEAMS project aims at designing a virtual environment for training medical team leaders to non-technical skills. The virtual environment ispopulated with autonomous virtual agents who are able to make mistakes (in action or communication) in order to train rescue team leaders and to make them adaptive with all kinds of situations or teams.

  7. Do Different Training Conditions Facilitate Team Implementation?

    DEFF Research Database (Denmark)

    Nielsen, Karina; Randall, Raymond; Christensen, Karl B.

    2017-01-01

    A mixed methods approach was applied to examine the effects of a naturally occurring teamwork intervention supported with training. The first objective was to integrate qualitative process evaluation and quantitative effect evaluation to examine how and why the training influence intervention...... outcomes. The intervention (N = 328) was supplemented with four training conditions (no training, team member training, team leader training, and a combination of training types). The second objective was to examine whether different training conditions support team member training in isolation......, but not in combination, led to positive outcomes. The integrated analysis of qualitative and quantitative data indicated that a number of contextual factors interacted with training experiences and outcomes to influence the success of team intervention....

  8. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  9. Implementation of a team-based learning course: Work required and perceptions of the teaching team.

    Science.gov (United States)

    Morris, Jenny

    2016-11-01

    Team-based learning was selected as a strategy to help engage pre-registration undergraduate nursing students in a second-year evidence-informed decision making course. To detail the preparatory work required to deliver a team-based learning course; and to explore the perceptions of the teaching team of their first experience using team-based learning. Descriptive evaluation. Information was extracted from a checklist and process document developed by the course leader to document the work required prior to and during implementation. Members of the teaching team were interviewed by a research assistant at the end of the course using a structured interview schedule to explore perceptions of first time implementation. There were nine months between the time the decision was made to use team-based learning and the first day of the course. Approximately 60days were needed to reconfigure the course for team-based learning delivery, develop the knowledge and expertise of the teaching team, and develop and review the resources required for the students and the teaching team. This reduced to around 12days for the subsequent delivery. Interview data indicated that the teaching team were positive about team-based learning, felt prepared for the course delivery and did not identify any major problems during this first implementation. Implementation of team-based learning required time and effort to prepare the course materials and the teaching team. The teaching team felt well prepared, were positive about using team-based learning and did not identify any major difficulties. Crown Copyright © 2016. Published by Elsevier Ltd. All rights reserved.

  10. Uncertainties in Transport Project Evaluation: Editorial

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Nielsen, Otto Anker

    2015-01-01

    University of Denmark, September 2013. The conference was held under the auspices of the project ‘Uncertainties in transport project evaluation’ (UNITE) which is a research project (2009-2014) financed by the Danish Strategic Research Agency. UNITE was coordinated by the Department of Transport......This following special issue of the European Journal of Transport Infrastructure Research (EJTIR) containing five scientific papers is the result of an open call for papers at the 1st International Conference on Uncertainties in Transport Project Evaluation that took place at the Technical...

  11. Research on evaluation of enterprise project culture based on Denison model

    Directory of Open Access Journals (Sweden)

    Yucheng Zeng

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to build enterprise project culture evaluation model and search for the best evaluation method for Chinese enterprise project culture on the basis of studying and drawing lessons from enterprise culture evaluation theory and method at home and abroad. Design/methodology/approach: Referring to the Denison enterprise culture evaluation model, this paper optimizes it according to the difference of enterprise project culture, designs the enterprise project culture evaluation model and proves the practicability of the model through empirical. Finding: This paper finds that it`s more applicable to use the Denison model for enterprise project culture evaluation through the comparative analysis of domestic and foreign enterprise culture evaluation theory and method, the systematic project culture management framework of Chinese enterprises has not yet formed through empirical research, and four factors in enterprise project culture have important influence on project operation performance improvement. Research limitations/implications: The research on evaluation of enterprise project culture based on Denison model is a preliminary attempt, the design of evaluation index system, evaluation model and scale structure also need to be improved, but the thinking of this paper in this field provides a valuable reference for future research. Practical Implications: This paper provides the support of theory and practice for evaluating the present situation of enterprise project culture construction and analyzing the advantages and disadvantages of project culture, which contributes to the "dialectical therapy" of enterprise project management, enterprise management and enterprise project culture construction. Originality/value: The main contribution of this paper is the introduction of Denison enterprise culture model. Combining with the actual situation of enterprises, this paper also builds the evaluation model for

  12. The Workings of a Multicultural Research Team

    Science.gov (United States)

    Friedemann, Marie-Luise; Pagan-Coss, Harald; Mayorga, Carlos

    2013-01-01

    Purpose Transcultural nurse researchers are exposed to the challenges of developing and maintaining a multiethnic team. With the example of a multicultural research study of family caregivers conducted in the Miami-Dade area, the authors guide the readers through steps of developing a culturally competent and effective team. Design Pointing out challenges and successes, the authors illustrate team processes and successful strategies relative to recruitment of qualified members, training and team maintenance, and evaluation of team effectiveness. Method With relevant concepts from the literature applied to practical examples, the authors demonstrate how cultural team competence grows in a supportive work environment. PMID:18390824

  13. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  14. Helping fluid teams work: A research agenda for effective team adaptation in healthcare.

    Science.gov (United States)

    Bedwell, Wendy L; Ramsay, P Scott; Salas, Eduardo

    2012-12-01

    Although membership changes within teams are a common practice, research into this phenomenon is relatively nascent (Summers et al.; Acad Manag J 55:314-338, 2012). The small literature base, however, does provide insight into skills required for effective adaptation. The purpose of this effort is to provide a brief research synopsis, leading to research hypotheses about medical team training. By generalizing previous scientific findings regarding skills required for effective membership adaptation in different kinds of teams, we posit mechanisms whereby teamwork training might also support adaptation among medical teams (Burke et al.; Qual & Saf Health Care 13:i96-i104, 2004 and Salas et al.; Theor Issues Ergon Sci 8:381-394, 2007). We provide an overview of the membership change literature. Drawing upon literature from both within and outside of the medical domain, we suggest a framework and research propositions to aid in research efforts designed to determine the best content for helping to create adaptable medical teams through team training efforts. For effective adaptation, we suggest ad hoc teams should be trained on generalizable teamwork skills, to share just "enough" and the "right" information, to engage in shared leadership, and to shift from explicit to implicit coordination. Our overarching goal was to present what is known from the general research literature on successful team adaptation to membership changes, and to propose a research agenda to evaluate whether findings generalize to member changes in medical teams.

  15. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  16. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  17. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  18. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  19. The importance of trust in virtual team knowledge mediation

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    For transnational companies, virtual project teams are a means of overcoming temporal, geographical and organizational boundaries between team members. However, because the level of knowledge communication has been shown to be influenced by trust (e.g. Staples & Webster 2008; Quigley, Tesluk, Locke......, and will examine how the corporate context, consisting of embedded cultures, corporate structures and orgamizational communities of practice (CoP) support relationships, identity, trust and knowledge communication. According to the literature review on virtual teams conducted by Martins, Gilson & Maynard (2004...

  20. First responder resuscitation teams in a rural Norwegian community: sustainability and self-reports of meaningfulness, stress and mastering

    Directory of Open Access Journals (Sweden)

    Meland Eivind

    2010-05-01

    Full Text Available Abstract Background Training of lay first responder personnel situated closer to the potential victims than medical professionals is a strategy potentially capable of shortening the interval between collapse and start of cardiopulmonary resuscitation (CPR in cases of out-of-hospital cardiac arrest. In this study we trained lay first responders personnel in basic life support (BLS and defibrillation for cases of cardiac arrest and suspected acute myocardial infarction (AMI. Methods Forty-two lay first responders living in remote areas or working in industries in the island community of Austevoll, Western Norway, were trained in CPR and defibrillation. We placed particular emphasis on the first responders being able to defibrillate a primary ventricular fibrillation (PVF in patients with AMI. The trainees were organised in four teams to attend victims of AMI and cardiac arrest while awaiting the arrival of the community emergency medical services. The purpose of the study was to find out whether the teams were able to function during the five-year study project, and to examine whether lives could be saved. The first responders completed questionnaires each year on their experiences of participation. Data on the medical actions of the teams were also collected. Results By the end of the project all groups were functioning. The questionnaires evidenced a reasonable degree of motivation and self-evaluated competence in both types of group organisation, but in spite of this attrition effects in the first responders were considerable. The first responders were called out on 24 occasions, for a total of 17 patients. During the study period no case of PVF occurred after the arrival of the first responders, and the number of AMIs was very low, strongly deviating from what was anticipated. No lives were saved by the project. Conclusions The teams were sustained for almost five years without any significant deterioration of self-reported stress or mastering