WorldWideScience

Sample records for project evaluation standards

  1. The Final Year Project (FYP) in Social Sciences: Establishment of Its Associated Competences and Evaluation Standards

    Science.gov (United States)

    Mateo, Joan; Escofet, Anna; Martinez, Francesc; Ventura, Javier; Vlachopoulos, Dimitrios

    2012-01-01

    This paper presents the fundamental characteristics of the Final Year Project (FYP), its associated competences and some evaluation standards that derived from a research conducted by the regional government of Catalonia (Spain) and the Catalan University Quality Assurance Agency. More analytically, the paper begins with the definition of the…

  2. Nuclear data standards - International Evaluation Co-operation volume 7

    International Nuclear Information System (INIS)

    Carlson, A.D.; Shibata, K.; Vonach, H.; Hambsch, F.J.; Chen, Z.; Hofmann, H.M.; Oh, S.Y.; Badikov, S.A.; Gai, E.V.; Pronyaev, V.G.; Smith, D.L.; Hale, G.M.; Kawano, T.; Larson, N.M.

    2006-01-01

    A Working Party on International Evaluation Co-operation was established under the sponsorship of the OECD/NEA Nuclear Science Committee (NSC) to promote the exchange of information on nuclear data evaluations, validation and related topics. Its aim is also to provide a framework for co-operative activities between members of the major nuclear data evaluation projects. This includes the possible exchange of scientists in order to encourage co-operation. Requirements for experimental data resulting from this activity are compiled. The working party determines common criteria for evaluated nuclear data files with a view to assessing and improving the quality and completeness of evaluated data. The parties to the project are: ENDF (United States), JEFF/EFF (NEA Data Bank member countries) and JENDL (Japan). Co-operation with evaluation projects of non-OECD countries is organised through the Nuclear Data Section of the International Atomic Energy Agency (IAEA). This report was issued by Subgroup 7, which was in charge of producing new evaluated neutron cross-section standards. When starting the project, there was a general consensus on the need to update these standards, as significant improvements had been made to the experimental database since 1991 when the last evaluation of these standards was performed. The present work was accomplished through efficient collaboration between a task force of the US Cross-section Evaluation Working Group (CSEWG), a Co-ordinated Research Project (CRP) of the International Atomic Energy Agency (IAEA) and Subgroup 7 of the Working Party on International Evaluation Co-operation (WPEC) of the NEA Nuclear Science Committee. Work is reported on the results of an international effort to evaluate the neutron cross-section standards. The evaluations include the H(n,n), 6 Li(n,t), 10 B(n,α), 10 B(n,α1γ), 197 Au(n,γ), 235 U(n,f) and 238 U(n,f) standard reactions. Evaluations were also produced for the non-standard 238 U(n,γ) and 239 Pu

  3. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  4. Evaluation of the INTERGROWTH-21st project newborn standard for use in Canada.

    Science.gov (United States)

    Liu, Shiliang; Metcalfe, Amy; León, Juan Andrés; Sauve, Reg; Kramer, Michael S; Joseph, K S

    2017-01-01

    To evaluate the performance of the INTERGROWTH-21st Project newborn standard vis-a-vis the current Canadian birth weight-for-gestational age reference. All hospital-based singleton live births in Canada (excluding Quebec) between 2002 and 2012 with a gestational age between 33 and 42 weeks were included using information obtained from the Canadian Institute for Health Information. Small- and large-for gestational age centile categories of the INTERGROWTH standard and Canadian reference were contrasted in terms of frequency distributions and rates of composite neonatal morbidity/mortality. Among 2,753,817 singleton live births, 0.87% and 9.63% were 97th centile, respectively, of the INTERGROWTH standard, while 2.27% and 3.55% were 97th centile, respectively, of the Canadian reference. Infants 97th centile had a composite neonatal morbidity/mortality rate of 46.4 and 12.9 per 1,000 live births, respectively, under the INTERGROWTH standard and 30.9 and 16.6 per 1,000 live births, respectively, under the Canadian reference. The INTERGROWTH standard 97th centile categories had detection rates of 3.14% and 9.74%, respectively, for composite neonatal morbidity/ mortality compared with 5.48% and 4.60%, respectively for the Canadian reference. Similar patterns were evident in high- and low-risk subpopulations. The centile distribution of the INTERGROWTH newborn standard is left shifted compared with the Canadian reference, and this shift alters the frequencies and neonatal morbidity/mortality rates associated with specific centile categories. Further outcome-based research is required for defining abnormal growth categories before the INTERGROWTH newborn standard can be used.

  5. Evaluation of the INTERGROWTH-21st project newborn standard for use in Canada.

    Directory of Open Access Journals (Sweden)

    Shiliang Liu

    Full Text Available To evaluate the performance of the INTERGROWTH-21st Project newborn standard vis-a-vis the current Canadian birth weight-for-gestational age reference.All hospital-based singleton live births in Canada (excluding Quebec between 2002 and 2012 with a gestational age between 33 and 42 weeks were included using information obtained from the Canadian Institute for Health Information. Small- and large-for gestational age centile categories of the INTERGROWTH standard and Canadian reference were contrasted in terms of frequency distributions and rates of composite neonatal morbidity/mortality.Among 2,753,817 singleton live births, 0.87% and 9.63% were 97th centile, respectively, of the INTERGROWTH standard, while 2.27% and 3.55% were 97th centile, respectively, of the Canadian reference. Infants 97th centile had a composite neonatal morbidity/mortality rate of 46.4 and 12.9 per 1,000 live births, respectively, under the INTERGROWTH standard and 30.9 and 16.6 per 1,000 live births, respectively, under the Canadian reference. The INTERGROWTH standard 97th centile categories had detection rates of 3.14% and 9.74%, respectively, for composite neonatal morbidity/ mortality compared with 5.48% and 4.60%, respectively for the Canadian reference. Similar patterns were evident in high- and low-risk subpopulations.The centile distribution of the INTERGROWTH newborn standard is left shifted compared with the Canadian reference, and this shift alters the frequencies and neonatal morbidity/mortality rates associated with specific centile categories. Further outcome-based research is required for defining abnormal growth categories before the INTERGROWTH newborn standard can be used.

  6. USL/DBMS NASA/PC R and D project system design standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  7. Summative and Formative Evaluations, National Skill Standards Project. Prepared for the National Grocers Association.

    Science.gov (United States)

    Hamm, Michael S.

    In 1993-1996, the Grocers Research and Educational Foundation of the National Grocers Association developed entry-level skill standards for the food marketing industry. A coalition formed early in the project directed the skill standard development process and solicited input from major organizations involved in the industry. The validity of the…

  8. Evaluation of measurement reproducibility using the standard-sites data, 1994 Fernald field characterization demonstration project

    International Nuclear Information System (INIS)

    Rautman, C.A.

    1996-02-01

    The US Department of Energy conducted the 1994 Fernald (Ohio) field characterization demonstration project to evaluate the performance of a group of both industry-standard and proposed alternative technologies in describing the nature and extent of uranium contamination in surficial soils. Detector stability and measurement reproducibility under actual operating conditions encountered in the field is critical to establishing the credibility of the proposed alternative characterization methods. Comparability of measured uranium activities to those reported by conventional, US Environmental Protection Agency (EPA)-certified laboratory methods is also required. The eleven (11) technologies demonstrated included (1) EPA-standard soil sampling and laboratory mass-spectroscopy analyses, and currently-accepted field-screening techniques using (2) sodium-iodide scintillometers, (3) FIDLER low-energy scintillometers, and (4) a field-portable x-ray fluorescence spectrometer. Proposed advanced characterization techniques included (5) alpha-track detectors, (6) a high-energy beta scintillometer, (7) electret ionization chambers, (8) and (9) a high-resolution gamma-ray spectrometer in two different configurations, (10) a field-adapted laser ablation-inductively coupled plasma-atomic emission spectroscopy (ICP-AES) technique, and (11) a long-range alpha detector. Measurement reproducibility and the accuracy of each method were tested by acquiring numerous replicate measurements of total uranium activity at each of two ''standard sites'' located within the main field demonstration area. Meteorological variables including temperature, relative humidity. and 24-hour rainfall quantities were also recorded in conjunction with the standard-sites measurements

  9. Evaluation of the WIPP Project's compliance with the EPA radiation protection standards for disposal of transuranic waste

    International Nuclear Information System (INIS)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M.

    1998-03-01

    The US Environmental Protection Agency's (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP's compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy's (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA's proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA's responses to EEG's comments

  10. Evaluating miscible flood projects for acquisition or viability

    International Nuclear Information System (INIS)

    Cassinat, J.C.

    1991-01-01

    Very little information exists regarding evaluating enhanced oil recovery (EOR) projects, in particular miscible floods. Due to the size and scope of most tertiary recovery projects, standard evaluation rules and techniques are too general and vague to adequately model these schemes. A procedure for identifying the risks associated with miscible EOR projects is presented. It is essential to set up a cash flow model that accurately represents the future performance of a miscible flood. Included in the model are the timing of crucial events such as expected solvent breakthrough and the injection of trace gas. The cash flow analysis allows a quick audit procedure and converts production into a monetary or economic evaluation criteria that can easily be compared to other investment alternatives. When evaluating a miscible flood project, forecasting production, solvent and chase gas recovery costs can become quite complex. An organized procedure for an evaluation will ensure that a comprehensive and thorough examination of all the data is completed, and will increase confidence levels associated with decision making. 32 refs., 4 figs., 4 tabs

  11. Does the Gold Standard label hold its promise in delivering higher Sustainable Development benefits? A multi-criteria comparison of CDM projects

    International Nuclear Information System (INIS)

    Drupp, Moritz A.

    2011-01-01

    The Clean Development Mechanism (CDM) has a twin objective: to help developed countries reduce GHG emissions, and to support developing countries in achieving Sustainable Development (SD). As a response to the widespread criticism of the CDM's unsatisfactory SD record, initiatives have developed premium labels like the Gold Standard, which applies two additional 'screens' to filter CDM projects for higher SD benefits. In order to determine whether Gold Standard projects can be associated with higher local SD benefits, this paper evaluates the potential benefits of 48 CDM projects using a multi-criteria method and building on existing work. The 18 evaluated Gold Standard projects are compared to a 'representative portfolio' of 30 unlabeled CDM projects in order to capture the 'full' effect of the additional Gold Standard requirements, which is further decomposed into the two 'screen' effects. The results suggest that Gold Standard Certified Emission Reductions can be associated with higher potential local SD benefits when compared to the 'representative portfolio' of unlabeled CDM projects, while the comparison of projects of the same type remains inconclusive. The results support previous findings showing that renewable energy projects may deliver comparatively high SD benefits. - Research highlights: → This study evaluates and compares the potential contribution of unlabeled- and Gold Standard labeled CDM projects to Sustainable Development (SD), extending the previously assessed projects as well as the methodological approach. → Gold Standard labeled Certified Emission Reductions (CER) can be associated with higher potential SD benefits compared to unlabeled projects. → A decomposition analysis shows that the Gold Standard s SD surplus must be primarily attributed to the favorable contribution of renewable energy projects to SD. → Policy makers might thus shift incentives towards renewable energy projects and buyers of CERs may shift their offset

  12. Statistical methods for evaluating the attainment of cleanup standards

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, R.O.; Simpson, J.C.

    1992-12-01

    This document is the third volume in a series of volumes sponsored by the US Environmental Protection Agency (EPA), Statistical Policy Branch, that provide statistical methods for evaluating the attainment of cleanup Standards at Superfund sites. Volume 1 (USEPA 1989a) provides sampling designs and tests for evaluating attainment of risk-based standards for soils and solid media. Volume 2 (USEPA 1992) provides designs and tests for evaluating attainment of risk-based standards for groundwater. The purpose of this third volume is to provide statistical procedures for designing sampling programs and conducting statistical tests to determine whether pollution parameters in remediated soils and solid media at Superfund sites attain site-specific reference-based standards. This.document is written for individuals who may not have extensive training or experience with statistical methods. The intended audience includes EPA regional remedial project managers, Superfund-site potentially responsible parties, state environmental protection agencies, and contractors for these groups.

  13. A Randomized Controlled Exploratory Evaluation of Standardized Ayurvedic Formulations in Symptomatic Osteoarthritis Knees: A Government of India NMITLI Project

    Directory of Open Access Journals (Sweden)

    Arvind Chopra

    2011-01-01

    Full Text Available The multidisciplinary “New Millennium Indian Technology Leadership Initiative” Arthritis Project was undertaken to validate Ayurvedic medicines. Herbal formulations in popular use were selected by expert consensus and standardized using modern tools. Our clinical strategy evolved from simple exploratory evaluations to better powered statistically designed drug trials. The results of the first drug trial are presented here. Five oral formulations (coded A, B, C, D and E, with a common base of Zingiber officinale and Tinospora cordifolia with a maximum of four plant extracts, were evaluated; with placebo and glucosamine as controls. 245 patients suffering from symptomatic OA knees were randomized into seven arms (35 patients per arm of a double blind, parallel efficacy, multicentric trial of sixteen weeks duration. The groups matched well at baseline. There were no differences for patient withdrawals (17.5% or adverse events (AE of mild nature. Intention-to-treat efficacy analysis, demonstrated no significant differences (P<.05 for pain (weight bearing and WOMAC questionnaire (knee function; placebo response was high. Based on better pain relief, significant (P<.05 least analgesic consumption and improved knee status, “C” formulation was selected for further development. Controlled exploratory drug trials with multiple treatment arms may be used to economically evaluate several candidate standardized formulations.

  14. Summary Report from the Technical Meeting Toward a New Evaluation of Neutron Standards, 8-12 July 2013, IAEA, Vienna

    International Nuclear Information System (INIS)

    Pronyaev, V.G.; Carlson, A.D.; Capote Noy, R.

    2013-07-01

    Updated standards evaluations for national cross section libraries (e.g. ENDF/B, JENDL, CENDL and JEFF) are needed as new versions of those libraries are anticipated. Also improvements made in the database and evaluation techniques for the standards can suggest that a new version of a library should be undertaken. A collaboration supported by an IAEA Data Development Project, was established in 2008 after the completion of the last standards evaluation in 2006. Before this project was initiated, there were very long periods between standards evaluations that can now be significantly shortened. The anticipation is that a new standards evaluation can be available whenever one is needed by a major evaluation library. The main objectives of this project are to continuously and critically review new experiments for inclusion in the standards database, and to consider extensions in energy of some of the standards. Other goals are to study improved evaluation procedures and codes for performing the evaluations, maintain those codes, and investigate inclusion of reference data that are not as well-known as the standards but are being widely used as reference in relative measurements of certain types of cross sections. Also included is an effort to improve evaluations of 235 U thermal and 252 Cf spontaneous fission neutron spectra. (author)

  15. Pre-Calculus California Content Standards: Standards Deconstruction Project. Version 1.0

    Science.gov (United States)

    Arnold, Bruce; Cliffe, Karen; Cubillo, Judy; Kracht, Brenda; Leaf, Abi; Legner, Mary; McGinity, Michelle; Orr, Michael; Rocha, Mario; Ross, Judy; Teegarden, Terrie; Thomson, Sarah; Villero, Geri

    2008-01-01

    This project was coordinated and funded by the California Partnership for Achieving Student Success (Cal-PASS). Cal-PASS is a data sharing system linking all segments of education. Its purpose is to improve student transition and success from one educational segment to the next. Cal-PASS' standards deconstruction project was initiated by the…

  16. Japanese national project for establishment of codes and standards for stationary PEFC system

    International Nuclear Information System (INIS)

    Sumi, S.; Ohmura, T.; Yamaguchi, R.; Kikuzawa, H.

    2003-01-01

    For the purpose of practical utilization of the PEFC cogeneration system, we are promoting the national projects of the 'Establishment of Codes and Standards for Stationary PEFC System'. The objective is to prepare the software platforms for wide spreading use, which are required in the introduction stage of the PEFC cogeneration systems, such as code and standards for safety, reliability, performance and so on. For this objective, using test samples of the systems and the stacks, developments of test and evaluation devices, collection of various kinds of data and establishment of test and evaluation methods are under way. (author)

  17. Standard protocol for evaluation of environmental transfer factors around NPP sites

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rao, D.D.

    2009-01-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for evaluation of environmental transfer factors around NPP sites. The studies on transfer factors are being carried out at various NPP sites under DAE-BRNS projects for evaluation of site specific transfer factors for radionuclides released from power plants. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  18. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  19. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  20. Standardizing the performance evaluation of short-term wind prediction models

    DEFF Research Database (Denmark)

    Madsen, Henrik; Pinson, Pierre; Kariniotakis, G.

    2005-01-01

    Short-term wind power prediction is a primary requirement for efficient large-scale integration of wind generation in power systems and electricity markets. The choice of an appropriate prediction model among the numerous available models is not trivial, and has to be based on an objective...... evaluation of model performance. This paper proposes a standardized protocol for the evaluation of short-term wind-poser preciction systems. A number of reference prediction models are also described, and their use for performance comparison is analysed. The use of the protocol is demonstrated using results...... from both on-shore and off-shore wind forms. The work was developed in the frame of the Anemos project (EU R&D project) where the protocol has been used to evaluate more than 10 prediction systems....

  1. Workshop : ACPSEM/ARPS competency based standards project

    International Nuclear Information System (INIS)

    Collins, L.

    1996-01-01

    The ACPSEM together with the Australian Radiation Protection Society has been working for nearly two years now on a competency based standards project for the professions of medical and health physicists. Competencies are being used increasingly in industry and the professions as a means of determining skill levels. For example, all the medical radiation technology streams have a CBS system in the final stages of development, and our engineering colleagues have completed theirs. Last year there was a draft document sent to all members asking for feedback. Following a vote of funding by both bodies, a project offect (Dr David Waggett) has been appointed, and has produced a very much improved set of competency standards covering all significant subspecialties in our profession. This workshop will detail the work done so far, and preview the draft document. A healthy discussion will be encouraged, as the project steering group will shortly be arranging the next steps in process. (author)

  2. A Standardized Evaluation System for Decadal Climate Prediction

    Science.gov (United States)

    Kadow, C.; Cubasch, U.

    2012-12-01

    The evaluation of decadal prediction systems is a scientific challenge as well as a technical challenge in the climate research. The major project MiKlip (www.fona-miklip.de) for medium-term climate prediction funded by the Federal Ministry of Education and Research in Germany (BMBF) has the aim to create a model system that can provide reliable decadal forecasts on climate and weather. The model system to be developed will be novel in several aspects, with great challenges for the methodology development. This concerns especially the determination of the initial conditions, the inclusion into the model of processes relevant to decadal predictions, the increase of the spatial resolution through regionalisation, the improvement or adjustment of statistical post-processing, and finally the synthesis and validation of the entire model system. Therefore, a standardized evaluation system will be part of the MiKlip system to validate it - developed by the project 'Integrated data and evaluation system for decadal scale prediction' (INTEGRATION). The presentation gives an overview of the different linkages of such a project, shows the different development stages and gives an outlook for users and possible end users in climate service. The technical interface combines all projects inside of MiKlip and invites them to participate in a common evaluation system. The system design and the validation strategy from a standalone tool in the beginning to a user friendly web based system using GRID technologies to an integrated part of the operational MiKlip system for industry and society will give the opportunity to enhance the MiKlip strategy. First results of different possibilities of such a system will be shown to present the scientific background through Taylor diagrams, ensemble skill scores and e.g. climatological means to show the usability and possibilities of MiKlip and the INTEGRATION project.

  3. Interim radiological safety standards and evaluation procedures for subseabed high-level waste disposal

    International Nuclear Information System (INIS)

    Klett, R.D.

    1997-06-01

    The Seabed Disposal Project (SDP) was evaluating the technical feasibility of high-level nuclear waste disposal in deep ocean sediments. Working standards were needed for risk assessments, evaluation of alternative designs, sensitivity studies, and conceptual design guidelines. This report completes a three part program to develop radiological standards for the feasibility phase of the SDP. The characteristics of subseabed disposal and how they affect the selection of standards are discussed. General radiological protection standards are reviewed, along with some new methods, and a systematic approach to developing standards is presented. The selected interim radiological standards for the SDP and the reasons for their selection are given. These standards have no legal or regulatory status and will be replaced or modified by regulatory agencies if subseabed disposal is implemented. 56 refs., 29 figs., 15 tabs

  4. Evaluation of a new 10 mA DC current reference standard

    CERN Document Server

    Fernqvist, G; Power, F

    2002-01-01

    A new DC current reference standard has been developed as a component in a Current calibration hierarchy in the LHC project at CERN. The standard provides 10 mA DC current with an accuracy less than 0.5 ppm, drift less than 2 ppm/year and compliance error less than 0.1 ppm for 0-10 V. The paper gives the results from two years evaluation of a series of 5 units.

  5. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.

    Science.gov (United States)

    Volden, Gro Holst

    2018-08-01

    Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  6. Project evaluation: one framework - four approaches

    DEFF Research Database (Denmark)

    Rode, Anna Le Gerstrøm; Svejvig, Per

    . Introducing a framework that can help structure such evaluations, the aim of this paper is to contribute to project theory and practice by inspiring project researchers and aiding project workers in their efforts to open up the black box of projects and deliver relevant and valuable results......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on projects as well as normative arguments focusing on developing prescriptive knowledge of project management. Despite the need for effective...... project management and research methods that can assess effective project management methodologies, extant literature on evaluation procedures or guidelines on how to evaluate projects and/or project management is scarce. To address this challenge, this paper introduces an evaluation framework consisting...

  7. Projected Standard on neutron skyshine

    International Nuclear Information System (INIS)

    Westfall, R.M.; Williams, D.S.

    1987-07-01

    Current interest in neutron skyshine arises from the application of dry fuel handling and storage techniques at reactor sites, at the proposed monitored retrievable storage facility and at other facilities being considered as part of the civilian radioactive waste management programs. The chairman of Standards Subcommittee ANS-6, Radiation Protection and Shielding, has requested that a work group be formed to characterize the neutron skyshine problem and, if necessary, prepare a draft Standard. The work group is comprised of representatives of storage cask vendors, architect engineering firms, nuclear utilities, the academic community and staff members of national laboratories and government agencies. The purpose of this presentation summary is to describe the activities of the work group and the scope and contents of the projected Standard, ANS-6.6.2, ''Calculation and Measurement of Direct and Scattered Neutron Radiation from Nuclear Power Operations.'' The specific source under consideration by the work group is an array of dry fuel casks located at a reactor site. However, it is recognized that the scope of the standard should be broad enough to encompass other neutron sources. The Standard will define appropriate methodology for properly characterizing the neutron dose due to skyshine. This dose characterization is necessary, for example, in demonstrating compliance with pertinent regulatory criteria

  8. IPMA STANDARD ELEMENTS AND FEEDBACK IN PROJECT MANAGEMENT TEACHING

    Directory of Open Access Journals (Sweden)

    BARTOŠKA, Jan

    2011-09-01

    Full Text Available The paper proposes the concept of project management teaching including the International Project Management Association (IPMA standard. The concept of teaching is theoretical and derives from the notion of competence, which the IPMA standard is based on. The paper presents a brief description of the IPMA standard and endeavours to define the notion of competence. The competence is worked with in respect to hierarchical recognition. The proposed teaching concept works with the concepts of information, knowledge and skills. The teaching proposal stems from the structure and contents of the IPMA standard elements. Furthermore, the paper elaborates the issue of embedding the elements of the IPMA standard competences into training courses. In the article, the eye of the IPMA competences is further enhanced with possible training courses and specialist areas in which the standard elements can thematically be included. The paper states that the competence elements and training courses cross one another and overlap in a manifold way. The authors also propose a way which could verify into what extent the students have actually acquired taught IPMA competence elements. The paper contains the proposal of feedback quantification for the IPMA standard and project management teaching. The results of the paper can be used as a starting premise for future research. Both the verification proposal and the embedding of the elements into teaching are derived from on-going academic experience of the authors of the article.

  9. IPMA Standard Competence Scope in Project Management Education

    Science.gov (United States)

    Bartoška, Jan; Flégl, Martin; Jarkovská, Martina

    2012-01-01

    The authors of the paper endeavoured to find out key competences in IPMA standard for educational approaches in project management. These key competences may be used as a basis for project management university courses. An incidence matrix was set up, containing relations between IPMA competences described in IPMA competence baseline. Further,…

  10. Standard characterization of phosphate rock samples from the FAO/IAEA phosphate project

    International Nuclear Information System (INIS)

    Binh, Truong; Zapata, F.

    2002-01-01

    Phosphate rocks (PR) are phosphate-bearing minerals that vary widely in their inherent characteristics and consequently their agronomic potential. In the framework of a FAO/IAEA networked research project, the evaluation of the agronomic effectiveness of natural and modified PR products under a variety of soil climate and crop management conditions was carried out. The characterization of phosphate rocks is the first and essential step in evaluating their suitability for direct application. If several PR sources are utilized, standardized methods should be used for comparison purposes to determine their agronomic potential. This paper describes the standard characterization of phosphate rock products utilized in the project, in particular the mineralogical and crystallographic analyses, physical analyses, chemical composition and solubility in conventional reagents. A total of 28 phosphate rock samples from 15 countries were collected and analyzed in specialized laboratories. The data on mineralogy, chemical composition and solubility in conventional reagents are closely interrelated. An arbitrary classification of the reactivity of the PR samples was made based on the solubility indices in conventional reagents. On another hand, the results of the crystallographic parameters, calculated indices of absolute solubility, specific surface and porosity reflect the variability of the physical state and the sample pre-conditioning treatment of the analyzed products. A proper characterization of phosphate rock samples should provide the maximum of basic information that can be obtained in a cost-effective manner in normal chemical laboratories. Based on the results of this characterization, the following determinations are recommended: a description of the sample, major elemental (total P, Ca, Mg) composition, solubility in conventional reagents (neutral ammonium citrate, citric and formic acid) and particle size analysis. The classification of PR samples for direct

  11. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  12. Manual for research, development and technology program and project evaluations : final report.

    Science.gov (United States)

    2016-04-01

    This manual provides the Federal Railroad Administrations (FRA) Office of Research, Development and Technology (RD&T) a : framework, standards, and procedures for planning, conducting, reporting, and using sound evaluations of RD&Ts projects fo...

  13. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Design and evaluation of a 10-mA DC current reference standard

    CERN Document Server

    Fernqvist, G; Pickering, J; Power, F

    2003-01-01

    A new DC current reference standard has been developed for high- current power converter calibration in the large hadron collider (LHC) project at the European Organization for Nuclear Research (CERN). This standard provides a near ideal 10-mA DC current with long-term drift of one part in 10/sup 6/ per year. The paper describes the requirements and the detailed design and evaluation of the unit. Since similar 10-V standards are commercially available, the paper concentrates on the unique current output capability of this device. (4 refs).

  15. Evaluation of the Neutron Data Standards

    Science.gov (United States)

    Carlson, A. D.; Pronyaev, V. G.; Capote, R.; Hale, G. M.; Chen, Z.-P.; Duran, I.; Hambsch, F.-J.; Kunieda, S.; Mannhart, W.; Marcinkevicius, B.; Nelson, R. O.; Neudecker, D.; Noguere, G.; Paris, M.; Simakov, S. P.; Schillebeeckx, P.; Smith, D. L.; Tao, X.; Trkov, A.; Wallner, A.; Wang, W.

    2018-02-01

    With the need for improving existing nuclear data evaluations, (e.g., ENDF/B-VIII.0 and JEFF-3.3 releases) the first step was to evaluate the standards for use in such a library. This new standards evaluation made use of improved experimental data and some developments in the methodology of analysis and evaluation. In addition to the work on the traditional standards, this work produced the extension of some energy ranges and includes new reactions that are called reference cross sections. Since the effort extends beyond the traditional standards, it is called the neutron data standards evaluation. This international effort has produced new evaluations of the following cross section standards: the H(n,n), 6Li(n,t), 10B(n,α), 10B(n,α1 γ), natC(n,n), Au(n,γ), 235U(n,f) and 238U(n,f). Also in the evaluation process the 238U(n,γ) and 239Pu(n,f) cross sections that are not standards were evaluated. Evaluations were also obtained for data that are not traditional standards: the Maxwellian spectrum averaged cross section for the Au(n,γ) cross section at 30 keV; reference cross sections for prompt γ-ray production in fast neutron-induced reactions; reference cross sections for very high energy fission cross sections; the 252Cf spontaneous fission neutron spectrum and the 235U prompt fission neutron spectrum induced by thermal incident neutrons; and the thermal neutron constants. The data and covariance matrices of the uncertainties were obtained directly from the evaluation procedure.

  16. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  17. Radiographic analysis of the temporomandibular joint by the standardized projection technique

    International Nuclear Information System (INIS)

    Choe, Han Up; Park, Tae Won

    1983-01-01

    The purpose of this study was to investigate the radiographic images of the condylar head in clinically normal subjects and the TMJ patients using standardized projection technique. 45 subjects who have not clinical evidence of TMJ problems and 96 patients who have the clinical evidence of TMJ problems were evaluated, but the patients who had fracture, trauma and tumor on TMJ area were discluded in this study. For the evaluation of radiographic images, the author has observed the condylar head positions in closed mouth and 2.54 cm open mouth position taken by the standardized transcranial oblique lateral projection technique. The results were as follow: 1. In closed mouth position, the crest of condylar head took relatively posterior position to the deepest point of the glenoid fossa in 8.9% of the normals and in 26.6% of TMJ patients. 2. In 2.54 cm open mouth position, condylar head took relatively posterior position to the articular eminence in 2 .2% of TMJ patients and 39.6% of the normals. 3. In open mouth position, the horizontal distance from the deepest point of the glenoid fossa to the condylar head was 13.96 mm in the normals and 10.68 mm in TMJ patients. 4. The distance of true movement of condylar head was 13.49 mm in the normals and 10.27 mm in TMJ patients. 5. The deviation of mandible in TMJ patients was slightly greater than of the normals.

  18. The DLESE Evaluation Toolkit Project

    Science.gov (United States)

    Buhr, S. M.; Barker, L. J.; Marlino, M.

    2002-12-01

    The Evaluation Toolkit and Community project is a new Digital Library for Earth System Education (DLESE) collection designed to raise awareness of project evaluation within the geoscience education community, and to enable principal investigators, teachers, and evaluators to implement project evaluation more readily. This new resource is grounded in the needs of geoscience educators, and will provide a virtual home for a geoscience education evaluation community. The goals of the project are to 1) provide a robust collection of evaluation resources useful for Earth systems educators, 2) establish a forum and community for evaluation dialogue within DLESE, and 3) disseminate the resources through the DLESE infrastructure and through professional society workshops and proceedings. Collaboration and expertise in education, geoscience and evaluation are necessary if we are to conduct the best possible geoscience education. The Toolkit allows users to engage in evaluation at whichever level best suits their needs, get more evaluation professional development if desired, and access the expertise of other segments of the community. To date, a test web site has been built and populated, initial community feedback from the DLESE and broader community is being garnered, and we have begun to heighten awareness of geoscience education evaluation within our community. The web site contains features that allow users to access professional development about evaluation, search and find evaluation resources, submit resources, find or offer evaluation services, sign up for upcoming workshops, take the user survey, and submit calendar items. The evaluation resource matrix currently contains resources that have met our initial review. The resources are currently organized by type; they will become searchable on multiple dimensions of project type, audience, objectives and evaluation resource type as efforts to develop a collection-specific search engine mature. The peer review

  19. Structural requirements of research tissue banks derived from standardized project surveillance.

    Science.gov (United States)

    Herpel, E; Koleganova, N; Schreiber, B; Walter, B; Kalle, C V; Schirmacher, P

    2012-07-01

    Tissue banks constitute decisive and rate-limiting resource and technology platforms for basic and translational biomedical research, notably in the area of cancer. Thus, it is essential to plan and structure tissue banking and allocate resources according to research needs, but essential requirements are still incompletely defined. The tissue bank of the National Center of Tumor Diseases Heidelberg (NCT) was founded with the intention to provide tissues of optimal quality and to prioritize the realization of research projects. We analysed its structure and prospective project management registration as well as tracking records for all projects of the NCT tissue bank as of its start in 2005 in order to obtain information that may be relevant for tissue bank planning. All project proposals submitted to the NCT tissue bank (n = 681) were included in the study. For a detailed evaluation of provided services, only projects that were completed until July 2011 (n = 605) were analysed. For these 605 projects, NCT tissue bank provided 769 specific services. In all projects/services, we recorded project leader, type and amount of material provided, type of research (basic/translational), work load of project and project completion. Furthermore, all completed projects were tracked after 90 days according to a standard protocol to determine principal investigators' (PI) satisfaction and quality of the provided material. Until July 2011, 605 projects had been successfully completed as documented by material transfer agreement. Of the projects, 72.7 % addressed basic research, 22.3 % were translational research projects and 3 % concerned epidemiological research; 91 % (n = 546) concerned a single PI and the NTC tissue bank. For these projects, 769 specific services were provided. Of these services, 288 concerned providing formalin-fixed and paraffin-embedded (FFPE) tissue (extracts, full size sections), 126 providing fresh frozen materials (including fresh frozen

  20. Cryogenic Insulation Standard Data and Methodologies Project

    Science.gov (United States)

    Summerfield, Burton; Thompson, Karen; Zeitlin, Nancy; Mullenix, Pamela; Fesmire, James; Swanger, Adam

    2015-01-01

    Extending some recent developments in the area of technical consensus standards for cryogenic thermal insulation systems, a preliminary Inter-Laboratory Study of foam insulation materials was performed by NASA Kennedy Space Center and LeTourneau University. The initial focus was ambient pressure cryogenic boil off testing using the Cryostat-400 flat-plate instrument. Completion of a test facility at LETU has enabled direct, comparative testing, using identical cryostat instruments and methods, and the production of standard thermal data sets for a number of materials under sub-ambient conditions. The two sets of measurements were analyzed and indicate there is reasonable agreement between the two laboratories. Based on cryogenic boiloff calorimetry, new equipment and methods for testing thermal insulation systems have been successfully developed. These boiloff instruments (or cryostats) include both flat plate and cylindrical models and are applicable to a wide range of different materials under a wide range of test conditions. Test measurements are generally made at large temperature difference (boundary temperatures of 293 K and 78 K are typical) and include the full vacuum pressure range. Results are generally reported in effective thermal conductivity (ke) and mean heat flux (q) through the insulation system. The new cryostat instruments provide an effective and reliable way to characterize the thermal performance of materials under subambient conditions. Proven in through thousands of tests of hundreds of material systems, they have supported a wide range of aerospace, industry, and research projects. Boiloff testing technology is not just for cryogenic testing but is a cost effective, field-representative methodology to test any material or system for applications at sub-ambient temperatures. This technology, when adequately coupled with a technical standards basis, can provide a cost-effective, field-representative methodology to test any material or system

  1. Standard development at the Human Variome Project.

    Science.gov (United States)

    Smith, Timothy D; Vihinen, Mauno

    2015-01-01

    The Human Variome Project (HVP) is a world organization working towards facilitating the collection, curation, interpretation and free and open sharing of genetic variation information. A key component of HVP activities is the development of standards and guidelines. HVP Standards are systems, procedures and technologies that the HVP Consortium has determined must be used by HVP-affiliated data sharing infrastructure and should be used by the broader community. HVP guidelines are considered to be beneficial for HVP affiliated data sharing infrastructure and the broader community to adopt. The HVP also maintains a process for assessing systems, processes and tools that implement HVP Standards and Guidelines. Recommended System Status is an accreditation process designed to encourage the adoption of HVP Standards and Guidelines. Here, we describe the HVP standards development process and discuss the accepted standards, guidelines and recommended systems as well as those under acceptance. Certain HVP Standards and Guidelines are already widely adopted by the community and there are committed users for the others. © The Author(s) 2015. Published by Oxford University Press.

  2. Evaluating Living Standard Indicators

    Directory of Open Access Journals (Sweden)

    Birčiaková Naďa

    2015-09-01

    Full Text Available This paper deals with the evaluation of selected available indicators of living standards, divided into three groups, namely economic, environmental, and social. We have selected six countries of the European Union for analysis: Bulgaria, the Czech Republic, Hungary, Luxembourg, France, and Great Britain. The aim of this paper is to evaluate indicators measuring living standards and suggest the most important factors which should be included in the final measurement. We have tried to determine what factors influence each indicator and what factors affect living standards. We have chosen regression analysis as our main method. From the study of factors, we can deduce their impact on living standards, and thus the value of indicators of living standards. Indicators with a high degree of reliability include the following factors: size and density of population, health care and spending on education. Emissions of carbon dioxide in the atmosphere also have a certain lower degree of reliability.

  3. International Reactor Physics Experiment Evaluation (IRPhE) Project

    International Nuclear Information System (INIS)

    2013-01-01

    The International Reactor Physics Experiment Evaluation (IRPhE) Project aims to provide the nuclear community with qualified benchmark data sets by collecting reactor physics experimental data from nuclear facilities, worldwide. More specifically the objectives of the expert group are as follows: - maintaining an inventory of the experiments that have been carried out and documented; - archiving the primary documents and data released in computer-readable form; - promoting the use of the format and methods developed and seek to have them adopted as a standard. For those experiments where interest and priority is expressed by member countries or working parties and executive groups within the NEA provide guidance or co-ordination in: - compiling experiments into a standard international agreed format; - verifying the data, to the extent possible, by reviewing original and subsequently revised documentation, and by consulting with the experimenters or individuals who are familiar with the experimenters or the experimental facility; - analysing and interpreting the experiments with current state-of-the-art methods; - publishing electronically the benchmark evaluations. The expert group will: - identify gaps in data and provide guidance on priorities for future experiments; - involve the young generation (Masters and PhD students and young researchers) to find an effective way of transferring know-how in experimental techniques and analysis methods; - provide a tool for improved exploitation of completed experiments for Generation IV reactors; - coordinate closely its work with other NSC experimental work groups in particular the International Criticality Safety Benchmark Evaluation Project (ICSBEP), the Shielding Integral Benchmark Experiment Data Base (SINBAD) and others, e.g. knowledge preservation in fast reactors of the IAEA, the ANS Joint Benchmark Activities; - keep a close link with the working parties on scientific issues of reactor systems (WPRS), the expert

  4. [Evaluation standards and application for photography of schistosomiasis control theme].

    Science.gov (United States)

    Chun-Li, Cao; Qing-Biao, Hong; Jing-Ping, Guo; Fang, Liu; Tian-Ping, Wang; Jian-Bin, Liu; Lin, Chen; Hao, Wang; You-Sheng, Liang; Jia-Gang, Guo

    2018-02-26

    To set up and apply the evaluation standards for photography of schistosomiasis control theme, so as to offer the scientific advice for enriching the health information carrier of schistosomiasis control. Through the literature review and expert consultation, the evaluation standard for photography of schistosomiasis control theme was formulated. The themes were divided into 4 projects, such as new construction, natural scenery, working scene, and control achievements. The evaluation criteria of the theme photography were divided into the theme (60%), photographic composition (15%), focus exposure (15%), and color saturation (10%) . A total of 495 pictures (sets) from 59 units with 77 authors were collected from schistosomiasis epidemic areas national wide. After the first-step screening and second-step evaluation, the prizes of 3 themes of control achievements and new construction, working scene, and natural scenery were selected, such as 6 pictures of first prize, 12 pictures of second prize, 18 pictures of third prize, and 20 pictures of honorable prize. The evaluation standards of theme photography should be taken into the consideration of the technical elements of photography and the work specification of schistosomiasis prevention and control. In order to improve the ability of records for propaganda purpose of schistosomiasis control and better play a role of guiding correct propaganda, the training and guidance of photography of professionals should be carried out.

  5. Evaluation of helium impurity impacts on Spent Nuclear Fuel project processes (OCRWM)

    International Nuclear Information System (INIS)

    SHERRELL, D.L.

    1999-01-01

    This document identifies the types and quantities of impurities that may be present within helium that is introduced into multi-canister overpacks (MCO)s by various SNF Project facilities, including, but not limited to the Cold Vacuum Drying (CVD) Facility (CVDF). It then evaluates possible impacts of worst case impurity inventories on MCO drying, transportation, and storage processes. Based on the evaluation results, this document: (1) concludes that the SNF Project helium procurement specification can be a factor-of-ten less restrictive than a typical vendor's standard offering (99.96% pure versus the vendor's 99.997% pure standard offering); (2) concludes that the CVDF's current 99.5% purity requirement is adequate to control the quality of the helium that is delivered to the MCO by the plant's helium distribution system; and (3) recommends specific impurity limits for both of the above cases

  6. Status of Standardization Projects

    Science.gov (United States)

    1993-12-31

    A5 B 942 943 943 ASM SA 69 D, 8115 056; ASTM D 5118 FABRICATION OF FIBERBOARD SM AS B 941 943 943 A SM SA 69 Di- N 8115 0562 ASTM D 5168 FAB AND...DR&E(AR)759 STANDARDIZATION PROJECTS REPORT - 1ST QTR FY 1994 PREPARING ACTIVITY LISTING PA AAPAA p BPP .A- G/ASA NC AC 21 RC G CSOL- Qý yqFyýFT7RL AL...941 943 943 A SM SA 69 DH N 8115 0562 ASTM D 5168 FAB AND CLOSURE TRIPLE WALL SM AS B 941 943 943 A SM SA 69 DH N 8125 0379 V’L-B-61000 BOTTLES

  7. Evaluation system of Research and Development projects and services from ININ

    International Nuclear Information System (INIS)

    Reglero, R.

    1994-01-01

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author)

  8. Production of NDA Working Reference Materials for the Capability Evaluation Project

    International Nuclear Information System (INIS)

    Noll, P.D. Jr.; Marshall, R.S.

    1998-01-01

    The production of Non Destructive Assay (NDA) Working Reference Materials (WRMs) that are traceable to nationally recognized standards was undertaken to support implementation of the Idaho National Engineering and Environmental Laboratory (INEEL) Nondestructive Waste Assay Capability Evaluation Project (CEP). The WRMs produced for the CEP project consist of Increased Am/Pu mass ration (IAP) and depleted Uranium (DU) WRMs. The CEP IAP/DU WRM set provides radioactive material standards for use in combination with 55 gallon drum waste matrix surrogates for the assessment of waste NDA assay system performance. The Production of WRMs is a meticulous process that is not without certain trials and tribulations. Problems may arise at any of the various stages of WRM production which include, but are not limited to; material characterization (physical, chemical, and isotopic), material blend parameters, personnel radiation exposure, gas generation phenomenon, traceability to national standards, encapsulation, statistical evaluation of the data, and others. Presented here is an overall description of the process by which the CEP WRMs were produced and certified as well as discussions pertaining to some of the problems encountered and how they were solved

  9. Mark 4A project training evaluation

    Science.gov (United States)

    Stephenson, S. N.

    1985-01-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  10. Mark 4A project training evaluation

    Science.gov (United States)

    Stephenson, S. N.

    1985-11-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  11. Evaluation of helium impurity impacts on Spent Nuclear Fuel project processes (OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    SHERRELL, D.L.

    1999-09-21

    This document identifies the types and quantities of impurities that may be present within helium that is introduced into multi-canister overpacks (MCO)s by various SNF Project facilities, including, but not limited to the Cold Vacuum Drying (CVD) Facility (CVDF). It then evaluates possible impacts of worst case impurity inventories on MCO drying, transportation, and storage processes. Based on the evaluation results, this document: (1) concludes that the SNF Project helium procurement specification can be a factor-of-ten less restrictive than a typical vendor's standard offering (99.96% pure versus the vendor's 99.997% pure standard offering); (2) concludes that the CVDF's current 99.5% purity requirement is adequate to control the quality of the helium that is delivered to the MCO by the plant's helium distribution system; and (3) recommends specific impurity limits for both of the above cases.

  12. Validation of evaluated neutron standard cross sections

    International Nuclear Information System (INIS)

    Badikov, S.; Golashvili, T.

    2008-01-01

    Some steps of the validation and verification of the new version of the evaluated neutron standard cross sections were carried out. In particular: -) the evaluated covariance data was checked for physical consistency, -) energy-dependent evaluated cross-sections were tested in most important neutron benchmark field - 252 Cf spontaneous fission neutron field, -) a procedure of folding differential standard neutron data in group representation for preparation of specialized libraries of the neutron standards was verified. The results of the validation and verification of the neutron standards can be summarized as follows: a) the covariance data of the evaluated neutron standards is physically consistent since all the covariance matrices of the evaluated cross sections are positive definite, b) the 252 Cf spectrum averaged standard cross-sections are in agreement with the evaluated integral data (except for 197 Au(n,γ) reaction), c) a procedure of folding differential standard neutron data in group representation was tested, as a result a specialized library of neutron standards in the ABBN 28-group structure was prepared for use in reactor applications. (authors)

  13. Transport Project Evaluation

    DEFF Research Database (Denmark)

    Leleur, Steen

    1996-01-01

    Two main project evaluation approaches exist: cost-benefit analysis (CBA) and multi-criteria analysis (MCA). Related to a European road evaluation method (EURET 1.1) and the MCA-method, WARP, the paper proposes a set of so-called segregated investment return rates (SIRR) to integrate advantages...

  14. The International Criticality Safety Benchmark Evaluation Project

    International Nuclear Information System (INIS)

    Briggs, B. J.; Dean, V. F.; Pesic, M. P.

    2001-01-01

    In order to properly manage the risk of a nuclear criticality accident, it is important to establish the conditions for which such an accident becomes possible for any activity involving fissile material. Only when this information is known is it possible to establish the likelihood of actually achieving such conditions. It is therefore important that criticality safety analysts have confidence in the accuracy of their calculations. Confidence in analytical results can only be gained through comparison of those results with experimental data. The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the US Department of Energy. The project was managed through the Idaho National Engineering and Environmental Laboratory (INEEL), but involved nationally known criticality safety experts from Los Alamos National Laboratory, Lawrence Livermore National Laboratory, Savannah River Technology Center, Oak Ridge National Laboratory and the Y-12 Plant, Hanford, Argonne National Laboratory, and the Rocky Flats Plant. An International Criticality Safety Data Exchange component was added to the project during 1994 and the project became what is currently known as the International Criticality Safety Benchmark Evaluation Project (ICSBEP). Representatives from the United Kingdom, France, Japan, the Russian Federation, Hungary, Kazakhstan, Korea, Slovenia, Yugoslavia, Spain, and Israel are now participating on the project In December of 1994, the ICSBEP became an official activity of the Organization for Economic Cooperation and Development - Nuclear Energy Agency's (OECD-NEA) Nuclear Science Committee. The United States currently remains the lead country, providing most of the administrative support. The purpose of the ICSBEP is to: (1) identify and evaluate a comprehensive set of critical benchmark data; (2) verify the data, to the extent possible, by reviewing original and subsequently revised documentation, and by talking with the

  15. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  16. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    Science.gov (United States)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  17. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  18. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  19. IT Project Evaluation and Investment Decision

    Institute of Scientific and Technical Information of China (English)

    黄东兵; 张世英

    2004-01-01

    There are many kinds of real options,which are valuable,in each phase of the lifetime of an information technology(IT)project.However,in the current IT investment decision theory,real options that embedded in IT projects are not considered. In this paper, the process of IT project decision and implementation is fully analyzed, the real options that may be embedded in an IT project are identified, and a real option analysis (ROA) method is proposed for evaluation of an IT project under uncertain business environment. ROA employs Black-Scholes expansion model and cancels the assumption that the cost of project is certain. The numerical example manifests that the ROA can better evaluate IT project and select the IT investment alternative. Finally, a road map is provided to help selecting the suitable evaluation method to make IT investment decision.

  20. Notification: Evaluation of EPA’s Management Controls to Implement and Enforce Pesticide Worker Protection Standards

    Science.gov (United States)

    Project #OPE-FY17-0008, Feb 9, 2017.The EPA OIG plans to begin research to evaluate EPA’s management controls implementing the revised Worker Protection Standards (WPS) requirements to reduce pesticide exposure and risks to agricultural workers.

  1. Creating Robust Evaluation of ATE Projects

    Science.gov (United States)

    Eddy, Pamela L.

    2017-01-01

    Funded grant projects all involve some form of evaluation, and Advanced Technological Education (ATE) grants are no exception. Program evaluation serves as a critical component not only for evaluating if a project has met its intended and desired outcomes, but the evaluation process is also a central feature of the grant application itself.…

  2. Evaluation of microfinance projects.

    Science.gov (United States)

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  3. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  4. Uranium resource evaluation project quality assurance evaluation

    International Nuclear Information System (INIS)

    Grimes, J.G.

    1981-01-01

    This evaluation was conducted over an eight-month period from February 4 through October 1, 1980. During this time, field sampling was suspended for an indefinite time period while the National Uranium Resource Evaluation (NURE) Program underwent restructuring. In addition, the Uranium Resource Evaluation (URE) Project archives are being restructured. Since it is difficult to evaluate quality assurance needs of a program that is undergoing drastic change and because sections of the evaluation were well along before these changes were announced, this evaluation reflects the situation as it was during February 1980. The following quality assurance related programs are continuing to date: (1) periodic checks of field sampling procedures by the Supervising Field Geologist and the Director of Field Operations; (2) verification of field form information and laboratory analytical data verification for all geochemical surveys; (3) URE Project laboratory quality control program (all elements routinely analyzed); and (4) Ames interlaboratory quality control program (uranium only). UCC-ND was given the responsibility of conducting a Hydrogeochemical and Stream Sediment Reconnaissance (HSSR) survey in the Central United States (Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Nebraska, North Dakota, Oklahoma, Texas, South Dakota, and Wisconsin). During 1979 and 1980, 13 detailed surveys were conducted by the URE Project in the Central and Western United States to characterize the hydrogeochemistry, stream sediment geochemistry, and/or radiometric patterns of known or potential uranium occurrences. Beginning in 1980, the HSSR surveys were modified to the Regional Hydrogeochemical and Stream Sediment (RHSS) surveys

  5. Computer-aided detection of breast carcinoma in standard mammographic projections with digital mammography

    Energy Technology Data Exchange (ETDEWEB)

    Destounis, Stamatia [Elizabeth Wende Breast Care, LLC, Rochester, NY (United States); University of Rochester, School of Medicine and Dentistry, Rochester, NY (United States); Hanson, Sarah; Morgan, Renee; Murphy, Philip; Somerville, Patricia; Seifert, Posy; Andolina, Valerie; Arieno, Andrea; Skolny, Melissa; Logan-Young, Wende [Elizabeth Wende Breast Care, LLC, Rochester, NY (United States)

    2009-06-15

    A retrospective evaluation of the ability of computer-aided detection (CAD) ability to identify breast carcinoma in standard mammographic projections. Forty-five biopsy proven lesions in 44 patients imaged digitally with CAD applied at examination were reviewed. Forty-four screening BIRADS {sup registered} category 1 digital mammography examinations were randomly identified to serve as a comparative normal/control population. Data included patient age; BIRADS {sup registered} breast density; lesion type, size, and visibility; number, type, and location of CAD marks per image; CAD ability to mark lesions; needle core and surgical pathologic correlation. The CAD lesion/case sensitivity of 87% (n=39), image sensitivity of 69% (n=31) for mediolateral oblique view and 78% (n=35) for the craniocaudal view was found. The average false positive rate in 44 normal screening cases was 2.0 (range 1-8). The 2.0 figure is based on 88 reported false positive CAD marks in 44 normal screening exams: 98% (n=44) lesions proceeded to excision; initial pathology upgraded at surgical excision from in situ to invasive disease in 24% (n=9) lesions. CAD demonstrated potential to detect mammographically visible cancers in standard projections for all lesion types. (orig.)

  6. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  7. EVALUATION OF THE PROJECT MANAGEMENT ORGANISATIONAL ABILITY OF PUBLIC ORGANISATIONS

    OpenAIRE

    Florescu Margareta

    2012-01-01

    The quality of the results of a project or a public programme, as well as the quality of project management consist in management process performance.This analysis tool promotes the idea of initiating a new organisational/functional policy – organisational tools regarding project management, a new standard concerning the complexity of the project and the associated risk, as well as a new standard concerning the project management organisational/functional ability. Political decision makers,...

  8. ESCC standards, evaluation and qualification of optical fiber connectors for space application

    Science.gov (United States)

    Taugwalder, Frédéric

    2017-11-01

    Optical fiber connectors have been used for the past fifteen years in space application. Reviewing the heritage left from past and current mission, the status of ESCC standards for these components and assemblies will help future use of fiber in space applications. In the frame of the ESA ECI program, Diamond has evaluated and is currently qualifying according to ESCC standards the AVIM and Mini-AVIM connectors. The configuration retained to qualify the connector sets is using a polarization maintaining fiber at 1550nm with a loose tube in PEEK as cable structure. The evaluation has been used to step-stress specific characteristics of the optical fiber connectors with a particular aim at possible failure modes to establish a safety factor for the qualification. The evaluation results presented can be used on a case by case to evaluate special applications that would require to extend the specification. The qualification components can be extended further and a structure for assemblies is proposed in order to simplify fiber optics implementation in space projects.

  9. USL/DBMS NASA/PC R and D project C programming standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of programming standards intended to promote reliability, readability, and portability of C programs written for PC research and development projects is established. These standards must be adhered to except where reasons for deviation are clearly identified and approved by the PC team. Any approved deviation from these standards must also be clearly documented in the pertinent source code.

  10. Evaluation of a draft standard on performance specifications for health physics instrumentation - program overview

    International Nuclear Information System (INIS)

    Kathren, R.L.; Selby, J.M.; Kenoyer, J.L.; Swinth, K.L.

    1983-01-01

    The draft ANSI Standard N42.17 on performance specifications for health physics instrumentation was written in 1981 by a task group that included both manufacturers and users of these instruments as well as representation from the regulatory bodies; the second draft of this standard is currently being evaluated by Pacific Northwest Laboratory. Objectives of this project include the evaluation of the applicability and practicality of the proposed standard and the determination of the degree of conformance of a cross-section of currently available commercial instruments to the proposed standard. This standard is being tested against such instruments as ionization chambers. G.M. detectors, alpha survey meters, and neutron dose equivalent survey meters. Radiological, electrical, mechanical, safety, and environmental performance criteria are specified and tests to evaluate conformance are detailed. Specific criteria which are discussed in this draft standard include inspection tests (e.g., readout units, scaling and zero set, decontamination, moisture protection, alarm threshold, battery status indication), AC and battery power requirements, alarm reset, stability, geotropism, response time, accuracy, precision, IER, beta, and neutron energy dependence, radiation overloads, angular dependence, extracameral response, nonionizing electromagnetic radiations, magnetic fields, interfering ionizing radiations, and effect of temperature, humidity, ambient pressure, shock, and vibration. The testing procedures were developed with emphasis on the requirements found in ANSI N42.17 with additional criteria from other draft and current ANSI and IEC standards

  11. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  12. Technical evaluation of draft ANSI Standard N13.30, ''Performance Criteria for Radiobioassay''

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1986-01-01

    To evaluate the appropriateness of the draft Standard, a research program, entitled Technical Evaluation of Draft ANSI Standard N13.30, ''Performance Criteria for Radiobioassay,'' was initiated at the Pacific Northwest Laboratory (PNL). This program incorporates a number of tasks including a nationwide, two-round intercomparison study to test the analytical performance of both in-vitro and in-vivo bioassay laboratories and determine their ability to meet the minimum performance criteria specified in the American National Standards Institute (ANSI) draft Standard, and other tasks related to the establishment of an accreditation laboratory. Based on two rounds of in-vitro testing and the in-vivo pilot study, the project staff has concluded that the criteria selected are appropriate for the existing state of the industry and achievable by most participating laboratories. Specific conclusions are as follows: the AMDA criteria are most difficult for the laboratories to achieve, the relative bias criterion is second in difficulty, and the precision criterion presents no problem for the laboratories, most of the participating laboratories can meet the Standard, and failure rates may decrease as the laboratories become knowledgeable of the performance criteria

  13. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  14. Oblique projections and standard-form transformations for discrete inverse problems

    DEFF Research Database (Denmark)

    Hansen, Per Christian

    2013-01-01

    This tutorial paper considers a specific computational tool for the numerical solution of discrete inverse problems, known as the standard-form transformation, by which we can treat general Tikhonov regularization problems efficiently. In the tradition of B. N. Datta's expositions of numerical li...... linear algebra, we use the close relationship between oblique projections, pseudoinverses, and matrix computations to derive a simple geometric motivation and algebraic formulation of the standard-form transformation....

  15. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  16. Evaluation of Pacific Islands Early Childhood Caries Prevention Project: Republic of the Marshall Islands.

    Science.gov (United States)

    Milgrom, Peter; Tut, Ohnmar K

    2009-01-01

    This communication reports an outcomes evaluation of the Pacific Islands Early Childhood Caries Prevention Project. The evaluation includes children in three conditions: a) topical fluoride varnish three times per school year; b) varnish plus twice-per-day toothbrushing; and c) intervention 2 plus three-times-per-day xylitol containing gummy bear snacks at school and home visits to encourage parental involvement. For this evaluation, groups 2 and 3 have been combined. One year after project implementation, mean decayed, extracted, or filled primary teeth was 10.3 [standard deviation (SD)= 4.3] teeth for group 1, and 8.2 (SD = 4.0) teeth for the combination of groups 2 and 3 (P 0.05). Evaluation confirms the outcome of a program including both in-school twice-daily toothbrushing with fluoridated toothpaste and frequent applications of fluoride varnish.

  17. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  18. 5 CFR 470.317 - Project evaluation.

    Science.gov (United States)

    2010-01-01

    ... law and/or regulation should be considered or proposed. Where the project plan provides for agency... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration...

  19. Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Smith, I.M.; Sale, M.J.

    1993-06-01

    Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.

  20. Computer-aided detection of breast carcinoma in standard mammographic projections with digital mammography

    International Nuclear Information System (INIS)

    Destounis, S.; Hanson, S.

    2007-01-01

    This study was conducted to retrospectively evaluate a computer-aided detection system's ability to detect breast carcinoma in multiple standard mammographic projections. Forty-five lesions in 44 patients imaged with digital mammography (Selenia registered , Hologic, Bedford, MA; Senographe registered , GE, Milwaukee, WI) and had computer-aided detection (CAD, Image-checker registered V 8.3.15, Hologic/R2, Santa Clara, CA) applied at the time of examination were identified for review; all were subsequently recommended to biopsy where cancer was revealed. These lesions were determined by the study Radiologist to be visible in both standard mammographic images (mediolateral oblique, MLO; craniocaudal, CC). For each patient, case data included patient age, tissue density, lesion type, BIRADS registered assessment, lesion size, lesion visibility-visible on MLO and/or CC view, ability of CAD to correctly mark the cancerous lesion, number of CAD marks per image, needle core biopsy results and surgical pathologic correlation. For this study cohort. CAD lesion/case sensitivity of 87% (n = 39) was found and image sensitivity was found to be 69% (n = 31) for MLO view and 78% (n = 35) for the CC view. For the study cohort, cases presented with a median of four marks per cases (range 0-13). Eighty-four percent (n = 38) of lesions proceeded to excision; initial needle biopsy pathology was upgraded at surgical excision from in situ disease to invasive for 24% (n = 9) lesions. CAD has demonstrated the potential to detect mammographically visible cancers in multiple standard mammographic projections in all categories of lesions in this study cohort. (orig.)

  1. Requirement Volatility, Standardization and Knowledge Integration in Software Projects: An Empirical Analysis on Outsourced IS Development Projects

    Directory of Open Access Journals (Sweden)

    Rajesri Govindaraju

    2015-08-01

    Full Text Available Information systems development (ISD projects are highly complex, with different groups of people having  to collaborate and exchange their knowledge. Considering the intensity of knowledge exchange that takes place in outsourced ISD projects, in this study a conceptual model was developed, aiming to examine the influence of four antecedents, i.e. standardization, requirement volatility, internal integration, and external integration, on two dependent variables, i.e. process performance and product performance. Data  were collected from 46 software companies in four big cities in Indonesia. The collected data were examined to verify the proposed theoretical model using the partial least square structural equation modeling (PLS-SEM technique. The results show that process performance is significantly influenced by internal integration and standardization, while product performance is  significantly influenced by external integration and  requirement volatility. This study contributes  to a better understanding of how knowledge integration can be managed in outsourced ISD projects in view of increasing their success.

  2. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. EVALUATION OF DIFFERENT INTERNAL STANDARDS FOR ...

    African Journals Online (AJOL)

    internal standard addition method was evaluated with the variation in solution ... background emissions involved in generating accurate and reliable .... The most suitable atomic and ionic wavelengths (λ) for the internal standards and precious ..... spectral interferences occur and using validation parameters is currently ...

  4. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  5. Neutron cross section standards evaluations for ENDF/B-VI

    International Nuclear Information System (INIS)

    Carlson, A.D.; Poenitz, W.P.; Hale, G.M.; Peelle, R.W.

    1985-01-01

    The neutron cross section standards are now being evaluated as the initial phase in the development of the new ENDF/B-VI file. These standards evaluations are following a somewhat different process compared with that used for earlier versions of ENDF. The primary effort is concentrated on a simultaneous evaluation using a generalized least squares program, R-matrix evaluations, and a procedure for combining the results of these evaluations. The ENDF/B-VI standards evaluation procedure is outlined, and preliminary simultaneous evaluation and R-matrix results are presented. 16 refs., 7 figs

  6. The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

    Science.gov (United States)

    Suhaida, S. K.; Wong, Z. D.

    2017-11-01

    Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.

  7. GEAR UP Aspirations Project Evaluation

    Science.gov (United States)

    Trimble, Brad A.

    2013-01-01

    The purpose of this study was to conduct a formative evaluation of the first two years of the Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP) Aspirations Project (Aspirations) using a Context, Input, Process, and Product (CIPP) model so as to gain an in-depth understanding of the project during the middle school…

  8. The Human Variome Project (HVP) 2009 Forum "Towards Establishing Standards".

    Science.gov (United States)

    Howard, Heather J; Horaitis, Ourania; Cotton, Richard G H; Vihinen, Mauno; Dalgleish, Raymond; Robinson, Peter; Brookes, Anthony J; Axton, Myles; Hoffmann, Robert; Tuffery-Giraud, Sylvie

    2010-03-01

    The May 2009 Human Variome Project (HVP) Forum "Towards Establishing Standards" was a round table discussion attended by delegates from groups representing international efforts aimed at standardizing several aspects of the HVP: mutation nomenclature, description and annotation, clinical ontology, means to better characterize unclassified variants (UVs), and methods to capture mutations from diagnostic laboratories for broader distribution to the medical genetics research community. Methods for researchers to receive credit for their effort at mutation detection were also discussed. (c) 2010 Wiley-Liss, Inc.

  9. Stakeholder approach for evaluating organizational change projects.

    Science.gov (United States)

    Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri

    2008-01-01

    This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.

  10. Evaluation of Public Service Electric & Gas Company`s standard offer program, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Kito, M.S.; Moezzi, M.M.

    1995-07-01

    In May 1993, Public Service Electric and Gas (PSE&G), the largest investor-owned utility in New Jersey, initiated the Standard Offer program, an innovative approach to acquiring demand-side management (DSM) resources. In this program, PSE&G offers longterm contracts with standard terms and conditions to project sponsors, either customers or third-party energy service companies (ESCOs), on a first-come, first-serve basis to fill a resource block. The design includes posted, time-differentiated prices which are paid for energy savings that will be verified over the contract term (5, 10, or 15 years) based on a statewide measurement and verification (M&V) protocol. The design of the Standard Offer differs significantly from DSM bidding programs in several respects. The eligibility requirements and posted prices allow ESCOs and other energy service providers to market and develop projects among customers with few constraints on acceptable end use efficiency technologies. In contrast, in DSM bidding, ESCOs typically submit bids without final commitments from customers and the utility selects a limited number of winning bidders who often agree to deliver a pre-specified mix of savings from various end uses in targeted markets. The major objectives of the LBNL evaluation were to assess market response and customer satisfaction; analyze program costs and cost-effectiveness; review and evaluate the utility`s administration and delivery of the program; examine the role of PSE&G`s energy services subsidiary (PSCRC) in the program and the effect of its involvement on the development of the energy services industry in New Jersey; and discuss the potential applicability of the Standard Offer concept given current trends in the electricity industry (i.e., increasing competition and the prospect of industry restructuring).

  11. A mechanism for revising accreditation standards: a study of the process, resources required and evaluation outcomes.

    Science.gov (United States)

    Greenfield, David; Civil, Mike; Donnison, Andrew; Hogden, Anne; Hinchcliff, Reece; Westbrook, Johanna; Braithwaite, Jeffrey

    2014-11-21

    The study objective was to identify and describe the process, resources and expertise required for the revision of accreditation standards, and report outcomes arising from such activities. Secondary document analysis of materials from an accreditation standards development agency. The Royal Australian College of General Practitioners' (RACGP) documents, minutes and reports related to the revision of the accreditation standards were examined. The RACGP revision of the accreditation standards was conducted over a 12 month period and comprised six phases with multiple tasks, including: review methodology planning; review of the evidence base and each standard; new material development; constructing field trial methodology; drafting, trialling and refining new standards; and production of new standards. Over 100 individuals participated, with an additional 30 providing periodic input and feedback. Participants were drawn from healthcare professional associations, primary healthcare services, accreditation agencies, government agencies and public health organisations. Their expertise spanned: project management; standards development and writing; primary healthcare practice; quality and safety improvement methodologies; accreditation implementation and surveying; and research. The review and development process was shaped by five issues: project expectations; resource and time requirements; a collaborative approach; stakeholder engagement; and the product produced. The RACGP evaluation was that participants were positive about their experience, the standards produced and considered them relevant for the sector. The revision of accreditation standards requires considerable resources and expertise, drawn from a broad range of stakeholders. Collaborative, inclusive processes that engage key stakeholders helps promote greater industry acceptance of the standards.

  12. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  13. Definition and compositions of standard wastestreams for evaluation of Buried Waste Integrated Demonstration treatment technologies

    International Nuclear Information System (INIS)

    Bates, S.O.

    1993-06-01

    The Buried Waste Integrated Demonstration (BWID) Project was organized at the Idaho National Engineering Laboratory to support research, development, demonstration, testing, and evaluation of emerging technologies that offer promising solutions to remediation of buried waste. BWID will identify emerging technologies, screen them for applicability to the identified needs, select technologies for demonstration, and then evaluate the technologies based on prescribed performance objectives. The technical objective of the project is to establish solutions to Environmental Restoration and Waste Management's technological deficiencies and improve baseline remediation systems. This report establishes a set of standard wastestream compositions that will be used by BWID to evaluate the emerging technologies. Five wastestreams are proposed that use four types of waste and a nominal case that is a homogenized combination of the four wastes. The five wastestreams will provide data on the compositional extremes and indicate the technologies' effectiveness over the complete range of expected wastestream compositions

  14. Standards, intercomparisons and performance evaluations for low-level and environmental radionuclide mass spectrometry and atom counting

    International Nuclear Information System (INIS)

    Inn, K.G.W.; McCurdy, D.; Bell III, T.; Loesch, R.; Barss, N.M.; Morton, J.S.; Povinec, P.; Burns, K.; Henry, R.

    2001-01-01

    Because of the demand for higher sensitivity radionuclide measurements, atom counting technology will become an increasingly used modality in geo-and bio-studies, and process control operations. It is anticipated that requests, intercomparisons and performance evaluations services will surge in near future. In anticipation of such requests, the state-of-the-art needed to be assessed for proactive planning purposes. The results of a workshop focused on these issues indicated that there are several ongoing standards, intercomparisons and performance evaluations thrusts which are expected to expand in the future. Furthermore, new projects were planned and the Council on Ionizing Radiation Measurements and Standards (Public and Environmental Radiation Protection subcommittee) ws proposed as an information coordinator. (author)

  15. Green and sustainable remediation (GSR) evaluation: framework, standards, and tool. A case study in Taiwan.

    Science.gov (United States)

    Huang, Wen-Yen; Hung, Weiteng; Vu, Chi Thanh; Chen, Wei-Ting; Lai, Jhih-Wei; Lin, Chitsan

    2016-11-01

    Taiwan has a large number of poorly managed contaminated sites in need of remediation. This study proposes a framework, a set of standards, and a spreadsheet-based evaluation tool for implementing green and sustainable principles into remediation projects and evaluating the projects from this perspective. We performed a case study to understand how the framework would be applied. For the case study, we used a spreadsheet-based evaluation tool (SEFA) and performed field scale cultivation tests on a site contaminated with total petroleum hydrocarbons (TPHs). The site was divided into two lots: one treated by chemical oxidation and the other by bioremediation. We evaluated five core elements of green and sustainable remediation (GSR): energy, air, water resources, materials and wastes, and land and ecosystem. The proposed evaluation tool and field scale cultivation test were found to efficiently assess the effectiveness of the two remediation alternatives. The framework and related tools proposed herein can potentially be used to support decisions about the remediation of contaminated sites taking into account engineering management, cost effectiveness, and social reconciliation.

  16. Project SEARCH UK--Evaluating Its Employment Outcomes

    Science.gov (United States)

    Kaehne, Axel

    2016-01-01

    Background: The study reports the findings of an evaluation of Project SEARCH UK. The programme develops internships for young people with intellectual disabilities who are about to leave school or college. The aim of the evaluation was to investigate at what rate Project SEARCH provided employment opportunities to participants. Methods: The…

  17. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  18. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR-06 are highlighted, and the future of the two projects is discussed

  19. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  20. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  1. Criticality safety benchmark evaluation project: Recovering the past

    Energy Technology Data Exchange (ETDEWEB)

    Trumble, E.F.

    1997-06-01

    A very brief summary of the Criticality Safety Benchmark Evaluation Project of the Westinghouse Savannah River Company is provided in this paper. The purpose of the project is to provide a source of evaluated criticality safety experiments in an easily usable format. Another project goal is to search for any experiments that may have been lost or contain discrepancies, and to determine if they can be used. Results of evaluated experiments are being published as US DOE handbooks.

  2. Evolving Our Evaluation of Lighting Environments Project

    Science.gov (United States)

    Terrier, Douglas; Clayton, Ronald; Clark, Toni Anne

    2016-01-01

    Imagine you are an astronaut on their 100th day of your three year exploration mission. During your daily routine to the small hygiene compartment of the spacecraft, you realize that no matter what you do, your body blocks the light from the lamp. You can clearly see your hands or your toes but not both! What were those design engineers thinking! It would have been nice if they could have made the walls glow instead! The reason the designers were not more innovative is that their interpretation of the system lighting requirements didn't allow them to be so! Currently, our interior spacecraft lighting standards and requirements are written around the concept of a quantity of light illuminating a spacecraft surface. The natural interpretation for the engineer is that a lamp that throws light to the surface is required. Because of certification costs, only one lamp is designed and small rooms can wind up with lamps that may be inappropriate for the room architecture. The advances in solid state light emitting technologies and optics for lighting and visual communication necessitates the evaluation of how NASA envisions spacecraft lighting architectures and how NASA uses industry standards for the design and evaluation of lighting system. Current NASA lighting standards and requirements for existing architectures focus on the separate ability of a lighting system to throw light against a surface or the ability of a display system to provide the appropriate visual contrast. Realization that these systems can be integrated is not realized. The result is that the systems are developed independent from one another and potential efficiencies that could be realized from borrowing from the concept of one technology and applying it for the purpose of the other does not occur. This project investigated the possibility of incorporating large luminous surface lamps as an alternative or supplement to overhead lighting. We identified existing industry standards for architectural

  3. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential

  4. Evaluation methods for neutron cross section standards

    International Nuclear Information System (INIS)

    Bhat, M.R.

    1980-01-01

    Methods used to evaluate the neutron cross section standards are reviewed and their relative merits, assessed. These include phase-shift analysis, R-matrix fit, and a number of other methods by Poenitz, Bhat, Kon'shin and the Bayesian or generalized least-squares procedures. The problems involved in adopting these methods for future cross section standards evaluations are considered, and the prospects for their use, discussed. 115 references, 5 figures, 3 tables

  5. European Standards and Guidelines in a Nordic Perspective: Joint Nordic Project 2005-2006. ENQA Occasional Papers 11

    Science.gov (United States)

    Vinther-Jorgensen, Tue, Ed.; Hansen, Signe Ploug, Ed.

    2006-01-01

    This report presents the results of the joint 2005-06 project of the Nordic Quality Assurance Network in Higher Education (NOQA). The project focused on the European standards and guidelines for quality assurance agencies, examining them in a Nordic perspective. The project aimed at interpreting and clarifying the European standards and guidelines…

  6. Workforce development and effective evaluation of projects.

    Science.gov (United States)

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  7. Application of scenario analysis in the investment projects evaluation

    Directory of Open Access Journals (Sweden)

    Brzaković Tomislav

    2016-01-01

    Full Text Available Investing represents an investment in the present to achieve certain effects in the future, and risk is an essential part of the investment process. Scenario analysis involves key risk factors of the project, its sensitivity to changes in key factors and the likelihood of their changes. Scenario analysis allows us to assign probabilities to the base case, the best case and the worst case so that we can find the expected value and standard deviation of the project's NPV to get a better idea of the project's risk. The goal is to determine whether it is possible to make relevant investment decisions on the basis of the parameters of projects risk, such as the standard deviation and the coefficient of variation. The paper is based on a mathematical model, applied to a specific agricultural company. In our case, the project has a wide range of possibilities and a large potential negative value, which suggests a great risk of the project. Although the scenario analysis shows a higher risk, it is not clear if the project should be accepted or not, and therefore, it is necessary to conduct simulation analysis, in order to get reliable answers.

  8. On the contribution of labelled Certified Emission Reductions to sustainable development: A multi-criteria evaluation of CDM projects

    International Nuclear Information System (INIS)

    Nussbaumer, Patrick

    2009-01-01

    The Clean Development Mechanism (CDM) has a twofold objective, to offset greenhouse gas emissions and to contribute to sustainable development in the host country. The contribution to the latter objective seems marginal in most CDM activities. Also, CDM activities are unevenly spread among developing countries. In response to these concerns, initiatives with the objective of promoting CDM projects with broad local sustainable development dividends have been launched, such as the Gold Standard and the Community Development Carbon Fund. The Gold Standard label rewards best-practice CDM projects while the Community Development Carbon Fund focuses on promoting CDM activities in underprivileged communities. Using a multi-criteria method, the potential contribution to local sustainable development of those CDM projects with particular attributes is compared with ordinary ones. This evaluation suggests that labelled CDM activities tend to slightly outperform comparable projects, although not unequivocally

  9. Equitable Financial Evaluation Method for Public-Private Partnership Projects

    Institute of Scientific and Technical Information of China (English)

    KE Yongjian; LIU Xinping; WANG Shouqing

    2008-01-01

    The feasibility study of a public-private partnership (PPP) project is regarded as one of the critical factors for successful implementation,but unfortunately the common financial evaluation methods currently used only represent the benefits of the private sector.There is,therefore,an urgent need to develop an equitable financial evaluation method for PPP projects.This paper presents a comprehensive literature review that examines international practices.An equitable financial evaluation method was then developed taking into account the inherent characteristics of PPP projects using six separate indicators and Monte Carlo simulations.The result for a bridge project in Romania shows that the method combines the viewpoints of all the relevant stakeholders to achieve an equitable financial evaluation of PPP projects.

  10. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  11. Payment card industry data security standard : readiness project

    OpenAIRE

    Βεργέτης, Μιχαήλ

    2015-01-01

    This paper is my thesis as part of my studies at the Department of Informatics, at University of Piraeus for the Postgraduate Programme in “Techno-economic Management & Security of Digital Systems”. Scope of this paper is to introduce to the reader with the basics of PCI DSS and to guide and provide any sort of assistance to organizations willing to achieve compliance with the Payment Card Industry Data Security Standard (PCI DSS). As for its practical section, a PCI DSS readiness project has...

  12. Uncertainties in Transport Project Evaluation: Editorial

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Nielsen, Otto Anker

    2015-01-01

    University of Denmark, September 2013. The conference was held under the auspices of the project ‘Uncertainties in transport project evaluation’ (UNITE) which is a research project (2009-2014) financed by the Danish Strategic Research Agency. UNITE was coordinated by the Department of Transport......This following special issue of the European Journal of Transport Infrastructure Research (EJTIR) containing five scientific papers is the result of an open call for papers at the 1st International Conference on Uncertainties in Transport Project Evaluation that took place at the Technical...

  13. Research on evaluation of enterprise project culture based on Denison model

    Directory of Open Access Journals (Sweden)

    Yucheng Zeng

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to build enterprise project culture evaluation model and search for the best evaluation method for Chinese enterprise project culture on the basis of studying and drawing lessons from enterprise culture evaluation theory and method at home and abroad. Design/methodology/approach: Referring to the Denison enterprise culture evaluation model, this paper optimizes it according to the difference of enterprise project culture, designs the enterprise project culture evaluation model and proves the practicability of the model through empirical. Finding: This paper finds that it`s more applicable to use the Denison model for enterprise project culture evaluation through the comparative analysis of domestic and foreign enterprise culture evaluation theory and method, the systematic project culture management framework of Chinese enterprises has not yet formed through empirical research, and four factors in enterprise project culture have important influence on project operation performance improvement. Research limitations/implications: The research on evaluation of enterprise project culture based on Denison model is a preliminary attempt, the design of evaluation index system, evaluation model and scale structure also need to be improved, but the thinking of this paper in this field provides a valuable reference for future research. Practical Implications: This paper provides the support of theory and practice for evaluating the present situation of enterprise project culture construction and analyzing the advantages and disadvantages of project culture, which contributes to the "dialectical therapy" of enterprise project management, enterprise management and enterprise project culture construction. Originality/value: The main contribution of this paper is the introduction of Denison enterprise culture model. Combining with the actual situation of enterprises, this paper also builds the evaluation model for

  14. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  15. Processes in the development of international specialist competencies and standards: the Sports Physiotherapy for All Project.

    Science.gov (United States)

    Bulley, Catherine; Donaghy, Marie

    2008-01-01

    In a world of rapidly developing knowledge it is important that professions describe their roles and capabilities. The need for a thorough description of sports physiotherapy was addressed through collaboration between the International Federation of Sports Physiotherapy (IFSP) and five European higher education institutions. This resulted in the Sports Physiotherapy for All Project, which has been successful in developing internationally accepted competencies and standards for sports physiotherapists. This article describes and reflects on the process to communicate useful lessons. A competency model was chosen to facilitate differentiation and communication of aspects of sports physiotherapy practice. Documentation relating to sports physiotherapy practice was collected from 16 countries and analysed thematically. A cut and paste method was used by a panel of experts to allocate themes to areas of practice within the competency model. Theme groups were used to select areas of practice for description in competency form. Standards were derived from competencies following in depth discussion with the expert panel, and triangulation with themes derived from international documentation. A rigorous process of international review and revision led to the final list of 11 competencies and related standards, both accepted by the IFSP. This work provides a foundation for the development of an audit toolkit to guide demonstration and evaluation of competencies and standards. This provides a foundation for targeted career development activities, appropriate provision of training opportunities, and quality enhancement. The experiences gained during this project can inform other health professions and their specialisms when embarking on a similar journey.

  16. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  17. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  18. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  19. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  20. Survey of an evaluation method for research and development projects; Kenkyu kaihatsu project no hyoka shuho ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report describes an interim evaluation method and a concrete evaluation method for projects promoted by the Agency of Industrial Science and Technology, and NEDO. As a result of the survey, a method of highly practical interim evaluation, concrete evaluation items, and evaluation criteria have been proposed by assuming that the projects are evaluated by the project evaluation department independent of the project promotion department. Long-term issues for constructing the evaluation system are also described. It is the most essential for the evaluation to fulfill the function of effective promotion of the following projects. It is also indispensable for the evaluation method and issues proposed in this report to communicate closely to project promoters and researchers, and to reassess the projects continuously. Continuous consideration for the feedback of evaluation process and the improvement of evaluation are significant for the long-term construction of system. 21 refs., 9 figs., 23 tabs.

  1. Designing an evaluation framework for WFME basic standards for medical education.

    Science.gov (United States)

    Tackett, Sean; Grant, Janet; Mmari, Kristin

    2016-01-01

    To create an evaluation plan for the World Federation for Medical Education (WFME) accreditation standards for basic medical education. We conceptualized the 100 basic standards from "Basic Medical Education: WFME Global Standards for Quality Improvement: The 2012 Revision" as medical education program objectives. Standards were simplified into evaluable items, which were then categorized as inputs, processes, outputs and/or outcomes to generate a logic model and corresponding plan for data collection. WFME standards posed significant challenges to evaluation due to complex wording, inconsistent formatting and lack of existing assessment tools. Our resulting logic model contained 244 items. Standard B 5.1.1 separated into 24 items, the most for any single standard. A large proportion of items (40%) required evaluation of more than one input, process, output and/or outcome. Only one standard (B 3.2.2) was interpreted as requiring evaluation of a program outcome. Current WFME standards are difficult to use for evaluation planning. Our analysis may guide adaptation and revision of standards to make them more evaluable. Our logic model and data collection plan may be useful to medical schools planning an institutional self-review and to accrediting authorities wanting to provide guidance to schools under their purview.

  2. Evaluation of Service Station Attendant-Auto Care Project.

    Science.gov (United States)

    Cress, Ronald J.

    The project described offers an approach to providing occupational skills to socially and educationally handicapped youth, specifically the skills necessary for a service station attendant in driveway salesmanship and auto care. The 10-page evaluation report presents project goals and objectives with evaluation data (represented graphically) and…

  3. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Guidelines and standards for museum conservation projects. 1180.70 Section 1180.70 Public Welfare Regulations Relating to Public Welfare (Continued..., as applied to art, history, natural history, science and technology, and living collections: (1...

  4. The Scalable Coherent Interface and related standards projects

    International Nuclear Information System (INIS)

    Gustavson, D.B.

    1991-09-01

    The Scalable Coherent Interface (SCI) project (IEEE P1596) found a way to avoid the limits that are inherent in bus technology. SCI provides bus-like services by transmitting packets on a collection of point-to-point unidirectional links. The SCI protocols support cache coherence in a distributed-shared-memory multiprocessor model, message passing, I/O, and local-area-network-like communication over fiber optic or wire links. VLSI circuits that operate parallel links at 1000 MByte/s and serial links at 1000 Mbit/s will be available early in 1992. Several ongoing SCI-related projects are applying the SCI technology to new areas or extending it to more difficult problems. P1596.1 defines the architecture of a bridge between SCI and VME; P1596.2 compatibly extends the cache coherence mechanism for efficient operation with kiloprocessor systems; P1596.3 defines new low-voltage (about 0.25 V) differential signals suitable for low power interfaces for CMOS or GaAs VLSI implementations of SCI; P1596.4 defines a high performance memory chip interface using these signals; P1596.5 defines data transfer formats for efficient interprocessor communication in heterogeneous multiprocessor systems. This paper reports the current status of SCI, related standards, and new projects. 16 refs

  5. Comprehensive Evaluation of Large Infrastructure Project Plan with ANP

    Institute of Scientific and Technical Information of China (English)

    HAN Chuan-feng; CHEN Jian-ye

    2005-01-01

    Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.

  6. Evaluation of the pilot procurement project in Germany

    International Nuclear Information System (INIS)

    Ostertag, Katrin

    2003-01-01

    Energy+ represents a European cooperative procurement initiative which aims at increasing the market share of highly energy-efficient cold appliances. Three years after its start, the project was recently evaluated in Germany. This paper discusses the main evaluation results and their implications for the project's further development. It covers the impacts of Energy+ on technology development and the commercial importance of the targeted appliances. Due to the project's relatively recent start, however, the main focus of the evaluation lies on the procurement process and practical implementation elements. Of particular interest are the specificities of the considered market segment which, in Germany and also in other participating countries, is characterised by highly dispersed consumers and the lack of large institutional buyers as candidates for a buyer group. The project therefore developed a new approach emphasising the role of retail organisations and of marketing activities by the project coordinators. The evaluation discusses several challenges related to this approach. This includes issues concerning the interfaces between international producers, their national branch offices and retailers as well as conflicts between the marketing approaches of producers and retailers, in particular with respect to the use of brand names and trade marks. Further, in Energy+ the communication between users and producers, an essential innovative element of cooperative procurement, cannot take its usual role, since consumers are not directly involved in the process. The paper shows how the project has dealt with these challenges and provides recommendations for the future project design

  7. Evaluating the Capacity of Standard Investment Appraisal Methods

    NARCIS (Netherlands)

    M.M. Akalu

    2002-01-01

    textabstractThe survey findings indicate the existence of gap between theory and practice of capital budgeting. Standard appraisal methods have shown a wider project value discrepancy, which is beyond and above the contingency limit. In addition, the research has found the growing trend in the use

  8. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  9. Development of fire protection standards for the EPR project

    International Nuclear Information System (INIS)

    Frank, H.J.; Kaercher, M.; Wittmann, R.

    2000-01-01

    In 1989 Framatome and Siemens decided by setting up their joint subsidiary NPI (Nuclear Power International) to co-operate in designing a new European Pressurised Water Reactor, the EPR. French and German utilities decided to participate in this project. In parallel to the co-operation on supplier's and utility's side, the French and German safety authorities and safety experts wanted to work closely together in order to harmonise and further develop the outstanding safety standards in France and Germany. An organisation has been set up to elaborate common codes related to the EPR design, at the level of the French design and construction rules (RCC) of the German KTA safety standards and DIN standards for nuclear technology, the so-called EPR technical codes (ETC). In this context the decision was made to develop a new fire protection code, the ETC-F, which should be harmonised between France and Germany. The article gives an insight in the developing process of the ETC-F and an outlook on existing and perhaps further national activities. (orig.) [de

  10. FY 2000 Project of developing international standards for supporting new industries. Comprehensive study for promotion of the international standardization; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru hokatsuteki chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This project studies the schemes for the international standardization, trends of the international standardization by the international standardization organizations and related organizations, and activities for the international standardization by the enterprises in the advanced countries, among others, in order to promote the international standardization for the 8 research and development themes. These themes are SMIL (synchronized multimedia integration language) tag standard of the three-dimensional image data, based on MXL; systems for detecting gene recombination products; methods for testing mileage of gas-fueled automobiles; measurement of multi-colors; testing/evaluation methods for highly coherent lasers; methods of evaluating optical performance of microlenses for optical information processing; recycled CFRPs; and devices for measuring marine environments. The study results indicate that progress of the development of the international standardization of the advanced technologies can be followed by investigating the characteristics of the ISO publications; ISO is studying the business plans being developed by each TC, in order to improve market adaptability of the international standards; and the European countries add conditions for standardization when the research and development themes are contracted. (NEDO)

  11. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

  12. Evaluation of rubber modified asphalt demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    As part of the Ontario Government's medium-term scrap tire management strategy, 11 rubber modified asphalt demonstration projects were funded or completed, with 13 additional projects from small to large (1,500-65,000 passenger tire equivalents) approved for the 1993 paving season. This report presents the results of an August to November 1993 study of the 11 demonstration projects. The evaluation included a description of the technology; technical review of the projects; economic analysis; review of the environmental literature; environmental review of the projects; comparison of the projects with similar ones in other jurisdictions; and recommendations. Detailed information on asphalt technology is included in an appendix.

  13. Internal evaluation of the European network for health technology assessment project.

    Science.gov (United States)

    Håheim, Lise Lund; Imaz, Iñaki; Loud, Marlène Läubli; Gasparetto, Teresa; González-Enriquez, Jesús; Dahlgren, Helena; Trofimovs, Igor; Berti, Elena; Mørland, Berit

    2009-12-01

    The internal evaluation studied the development of the European network for Health Technology Assessment (EUnetHTA) Project in achieving the general objective of establishing an effective and a sustainable network of health technology assessment (HTA) in Europe. The Work Package 3 group was dedicated to this task and performed the work. Information on activities during the project was collected from three sources. First, three yearly cross-sectional studies surveyed the participants' opinions. Responses were by individuals or by institutions. The last round included surveys to the Steering Committee, the Stakeholder Forum, and the Secretariat. Second, the Work Package Lead Partners were interviewed bi-annually, five times in total, to update the information on the Project's progress. Third, additional information was sought in available documents. The organizational structure remained stable. The Project succeeded in developing tools aimed at providing common methodology with intent to establish a standard of conducting and reporting HTA and to facilitate greater collaboration among agencies. The participants/agencies expressed their belief in a network and in maintaining local/national autonomy. The Work Package Leaders expressed a strong belief in the solid base of the Project for a future network on which to build, but were aware of the need for funding and governmental support. Participants and Work Package Leaders have expressed support for a future network that will improve national and international collaboration in HTA based on the experience from the EUnetHTA project.

  14. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  15. UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3. Revision E

    Science.gov (United States)

    Marston, Michael

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  16. A critical evaluation of the STRATEGY project

    DEFF Research Database (Denmark)

    Howard, B.J.; Liland, A.; Beresford, N.A.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management...... of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried...... out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated....

  17. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B. J.; Liland, A.; Beresford, N. A.; Andersson, K. G.; Cox, G.; Gil, J. M.; Hunt, J.; Nisbet, A.; Oughton, D. H.; Voigt, G.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated. (authors)

  18. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  19. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  20. Project Aprendizaje. Final Evaluation Report 1992-93.

    Science.gov (United States)

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  1. The Jeff evaluated nuclear data project

    Energy Technology Data Exchange (ETDEWEB)

    Koning, A.J.; Duijvestijn, M.C.; Hogenbirk, A.; Van der Marck, S.C.; Avrigeanu, M.; Avrigeanu, V.; Batistoni, P.; Pillon, M.; Bauge, E.; Bersillon, O.; Dos-Santos-Uzarralde, P.; Lopez Jimenez, M.J.; Morillon, B.; Romain, P.; Be, M.M.; Duchemin, B.; Huynh, T.D.; Jouanne, C.; Mounier, C.; Bem, P.; Bernard, D.; Bouland, O.; Courcelle, A.; Dupont, E.; Jacqmin, R.; Litaize, O.; Noguere, G.; Saint Jean, C. de; Santamarina, A.; Serot, O.; Sublet, J.Ch.; Bidaud, A.; Dean, C.J.; Perry, R.J.; Duhamel, I.; Nouri, A.; Gunsing, F.; Ridikas, D.; Fischer, U.; Leichtle, D.; Pereslavtsev, P.; Simakov, S.; Forrest, R.A.; Haeck, W.; Henriksson, H.; Kodeli, I.; Nordborg, C.; Rugama, Y.; Sartori, E.; Keinert, J.; Mattes, M.; Kellett, M.A.; Nichols, A.L.; Kopecky, J.; Leeb, H.; Leppanen, J.; Menapace, E.; Pescarini, M.; Mills, R.W.; Perel, R.L.; Plompen, A.J.M.; Rullhusen, P.; Seidel, K.; Tagesen, S.; Vonach, H.; Trkov, A

    2008-07-01

    The status of the Joint Evaluated Fission and Fusion file (JEFF) is described. JEFF-3.1 comprises a significant update of actinide evaluations, materials evaluations that have emerged from various European nuclear data projects, the activation library JEFF-3.1/A, the decay data and fission yield sub-libraries, and fusion-related data files from the EFF project. The revisions were motivated by the availability of new measurements, modelling capabilities and trends from integral experiments. Validations have been performed, mainly for criticality, reactivity temperature coefficients, fuel inventory and shielding of thermal and fast systems. Compared with earlier releases, JEFF-3.1 provides improved performance with respect to a variety of scientific and industrial applications. Following on from the public release of JEFF-3.1, the French nuclear power industry has selected this suite of nuclear applications libraries for inclusion in their production codes. (authors)

  2. The Jeff evaluated nuclear data project

    International Nuclear Information System (INIS)

    Koning, A.J.; Duijvestijn, M.C.; Hogenbirk, A.; Van der Marck, S.C.; Avrigeanu, M.; Avrigeanu, V.; Batistoni, P.; Pillon, M.; Bauge, E.; Bersillon, O.; Dos-Santos-Uzarralde, P.; Lopez Jimenez, M.J.; Morillon, B.; Romain, P.; Be, M.M.; Duchemin, B.; Huynh, T.D.; Jouanne, C.; Mounier, C.; Bem, P.; Bernard, D.; Bouland, O.; Courcelle, A.; Dupont, E.; Jacqmin, R.; Litaize, O.; Noguere, G.; Saint Jean, C. de; Santamarina, A.; Serot, O.; Sublet, J.Ch.; Bidaud, A.; Dean, C.J.; Perry, R.J.; Duhamel, I.; Nouri, A.; Gunsing, F.; Ridikas, D.; Fischer, U.; Leichtle, D.; Pereslavtsev, P.; Simakov, S.; Forrest, R.A.; Haeck, W.; Henriksson, H.; Kodeli, I.; Nordborg, C.; Rugama, Y.; Sartori, E.; Keinert, J.; Mattes, M.; Kellett, M.A.; Nichols, A.L.; Kopecky, J.; Leeb, H.; Leppanen, J.; Menapace, E.; Pescarini, M.; Mills, R.W.; Perel, R.L.; Plompen, A.J.M.; Rullhusen, P.; Seidel, K.; Tagesen, S.; Vonach, H.; Trkov, A.

    2008-01-01

    The status of the Joint Evaluated Fission and Fusion file (JEFF) is described. JEFF-3.1 comprises a significant update of actinide evaluations, materials evaluations that have emerged from various European nuclear data projects, the activation library JEFF-3.1/A, the decay data and fission yield sub-libraries, and fusion-related data files from the EFF project. The revisions were motivated by the availability of new measurements, modelling capabilities and trends from integral experiments. Validations have been performed, mainly for criticality, reactivity temperature coefficients, fuel inventory and shielding of thermal and fast systems. Compared with earlier releases, JEFF-3.1 provides improved performance with respect to a variety of scientific and industrial applications. Following on from the public release of JEFF-3.1, the French nuclear power industry has selected this suite of nuclear applications libraries for inclusion in their production codes. (authors)

  3. The European Union CREATE project: a model for international standardization of allergy diagnostics and vaccines

    NARCIS (Netherlands)

    Chapman, Martin D.; Ferreira, Fatima; Villalba, Mayte; Cromwell, Oliver; Bryan, Donna; Becker, Wolf-Meinhard; Fernández-Rivas, Montserrat; Durham, Stephen; Vieths, Stefan; van Ree, Ronald; Aalbers, M.; Notten, S.; Ooievaar-de Heer, P.; Ferreira, F.; Gademaier, G.; Wallner, M.; Villalba, M.; Rodriguez, R.; Becker, W.-M.; Eberhardt, F.; Lepp, U.; Raulf-Heimsoth, M.; Valenta, R.; Focke, M.; Bryan, D.; Dolman, C.; Das, R. G.; Vieths, S.; Fötisch, K.; Di Felice, G.; Pini, C.; Cromwell, O.; Fiebig, H.; Weber, B.; van Schijndel, H.; Dorpema, J. W.; Marco, F. M.; Monsalve, R.; Barber, D.; Caldas, E. Fernandez; Moingeon, P.; Didierlaurent, A.; André, C.; Kroon, A.; Neubauer, A.; Chapman, M.; Vailes, L.; Tsay, A.; Durham, S.; Custovic, A.; Simpson, B.; Knulst, A.; Rivas, M. Fernández; Mancebo, E. Gonzalez; Bahima, A. Cistero; Moncin, M. M. San Miguel; Mari, A.; Kinaciyan, T.; Quiralte, J.; Pauli, G.; de Blay, F.; Purohit, A.; Rak, S.

    2008-01-01

    Allergen measurements are used extensively in the formulation of allergy diagnostics and vaccines, yet no purified international allergen standards are available for calibration purposes. The aims of the European Union CREATE project were to develop international standards with verifiable allergen

  4. Student evaluation of research projects in a first-year physics laboratory

    International Nuclear Information System (INIS)

    Sharma, Manjula D; Mendez, Alberto; Sefton, Ian M; Khachan, Joe

    2014-01-01

    We describe the evaluation by students of a scheme of open-ended, research-based group project work which has become a standard component of first-year physics courses at the University of Sydney and is now in its 19th year of operation. Data were gathered from two sources: direct observations of the classes and a written survey. A summary of the classroom observations and the results from a detailed analysis of the survey responses are presented. The feedback from the cohort of approximately 800 students is largely positive but we identify a few discrepancies between stated course goals and the results from the survey. (paper)

  5. A new evaluation of the neutron data standards

    Directory of Open Access Journals (Sweden)

    Carlson A.D.

    2017-01-01

    Full Text Available Evaluations are being done for the H(n,n, 6Li(n,t, 10B(n,αγ, 10B(n,α, C(n,n, Au(n,γ, 235U(n,f and 238U(n,f standard cross sections. Evaluations are also being done for data that are not traditional standards including: the Au(n,γ cross section at energies below where it is considered a standard; reference cross sections for prompt gamma-ray production in fast neutron-induced reactions; reference cross sections for very high energy fission cross sections; the 235U thermal neutron fission spectrum and the 252Cf spontaneous fission neutron spectrum and the thermal constants.

  6. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  7. Monitoring the effectiveness evaluation of investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex O.

    2012-02-01

    Full Text Available The article raised the question of monitoring regulatory evaluation of the effectiveness of regional investment projects. This is justified by the fact that the current regulatory framework defined indicators for measuring the effectiveness of regional investment projects, but these figures are usually used only at the design stage of the project, an interim assessment of the effectiveness of a sufficiently simplified and based on the level of exploration investment.

  8. Economic Evaluation Methodology Review on KAERI's Recent Projects

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jin Sam; Kim, Jee Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    In technology utilization, economics evaluation is helpful to R and D program managers by giving them economic information needed to improve the usefulness of their projects. Moreover it can help them to communicate to others participants keeping all of them value-oriented minded through the whole development process. In this context, KAERI(Korea Atomic Energy Research Institute) has been performed economic evaluation on recent some projects. So, in this study, it has been made brief reviews on KAERI's economic evaluation methodology to its recent some projects of which evaluation we engage in, especially PEFP(Proton Engineering frontier Project) and SMART(Small Medium advanced ReacTor): Methodology comparison and their pros and cons

  9. Methodology for evaluation of railroad technology research projects

    Science.gov (United States)

    1981-04-01

    This Project memorandum presents a methodology for evaluating railroad research projects. The methodology includes consideration of industry and societal benefits, with special attention given to technical risks, implementation considerations, and po...

  10. Stress Optical Coefficient, Test Methodology, and Glass Standard Evaluation

    Science.gov (United States)

    2016-05-01

    ARL-TN-0756 ● MAY 2016 US Army Research Laboratory Stress Optical Coefficient, Test Methodology , and Glass Standard Evaluation...Stress Optical Coefficient, Test Methodology , and Glass Standard Evaluation by Clayton M Weiss Oak Ridge Institute for Science and Education...ORISE), Belcamp, MD Parimal J Patel Weapons and Materials Research Directorate, ARL Approved for public release; distribution is

  11. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  12. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  13. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  14. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  15. Continuous evaluation of midwives as to professional standards

    Directory of Open Access Journals (Sweden)

    ZAHRA YAZDANPANAHI

    2013-07-01

    Full Text Available Introduction: Implementation of professional standards as well as evaluation and assessments of providers has an important role in health promotion of each society. The purpose of this study was to assess the midwives working at midwifery offices as to performance of professional standards and effectiveness of continuous evaluation and education on them. Methods: This is an interventional study in which all of midwifery offices (110 were evaluated. The study was done in three stages using standard checklist observation and interview in each step. Based on detected errors, appropriate education was done and their performance was reevaluated in the next step of supervision. Finally total scores in each step as well as scores in different subjects were compared among three evaluated stages. Results: Overall mean score of faults at midwifery offices decreased from step 1 to step 3 in the following fields: environmental health and infection control (P<0.0002, personal and patient care (P=0.0005, individual health (P=0.003 and adherence to laws and rules (P<0.0001. Conclusion: Continuous evaluation is essential for assessing the effectiveness and improvement of our educational program. With continuous evaluation, correction of observed defects will be done at an early stage by appropriate intervention and education. So our medical and health programs will attain the planned goals.

  16. A portfolio evaluation framework for air transportation improvement projects

    Science.gov (United States)

    Baik, Hyeoncheol

    This thesis explores the application of portfolio theory to the Air Transportation System (ATS) improvement. The ATS relies on complexly related resources and different stakeholder groups. Moreover, demand for air travel is significantly increasing relative to capacity of air transportation. In this environment, improving the ATS is challenging. Many projects, which are defined as technologies or initiatives, for improvement have been proposed and some have been demonstrated in practice. However, there is no clear understanding of how well these projects work in different conditions nor of how they interact with each other or with existing systems. These limitations make it difficult to develop good project combinations, or portfolios that maximize improvement. To help address this gap, a framework for identifying good portfolios is proposed. The framework can be applied to individual projects or portfolios of projects. Projects or portfolios are evaluated using four different groups of factors (effectiveness, time-to-implement, scope of applicability, and stakeholder impacts). Portfolios are also evaluated in terms of interaction-determining factors (prerequisites, co-requisites, limiting factors, and amplifying factors) because, while a given project might work well in isolation, interdependencies between projects or with existing systems could result in lower overall performance in combination. Ways to communicate a portfolio to decision makers are also introduced. The framework is unique because (1) it allows using a variety of available data, and (2) it covers diverse benefit metrics. For demonstrating the framework, an application to ground delay management projects serves as a case study. The portfolio evaluation approach introduced in this thesis can aid decision makers and researchers at universities and aviation agencies such as Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD), in

  17. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  18. Survey report for fiscal 1999. Reference book for standard heat calculations in high-performance industrial furnace introduction field test project; 1999 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Hyojun netsu keisanshiki kijunsho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective to verify in a short time the heat recovery capability being the evaluation parameter for the technologies to develop the high-performance industrial furnace, a standard calculation book will be prepared, which standardizes the data collection methods and heat calculation methods, and is used as the standard data sheets and bases. Evaluations and analyses will be given on business types, furnace constructions, thermal technologies, and functions in the research items adopted in the field test project. The results will be used to recognize the business entities engaged in the project in the next fiscal year, furnace types and sizes, establish the industrial furnace subjected to researches in the next fiscal year, and proliferate and expand the related business entities. Standard data sheets will be prepared on seven kinds of furnaces, heating furnaces (continuous and batch types), ladles, heat treatment furnaces (continuous and batch types), gas treatment furnaces, and melting furnaces. The standard data sheets will cover the following items: evaluation parameters (energy saving rate, thermal efficiency, and waste heat recovery rate), calculating conditions to be the base for the evaluation parameters, a heat production book to be the base for calculating the heat unit requirement, and a standard calculation book to be the base for the heat production table. The standard data sheets (including the standard calculation book) and floppy disks are submitted. (NEDO)

  19. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Science.gov (United States)

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  20. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  1. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  2. Evaluation of ANSI/ASHRAE/USGBC/IES Standard 189.1-2009

    Energy Technology Data Exchange (ETDEWEB)

    Long, N.; Bonnema, E.; Field, K.; Torcellini, P.

    2010-07-01

    The National Renewable Energy Laboratory (NREL) evaluated ANSI/ASHRAE/USGBC/IES Standard 189.1-2009, 'The Standard for High-Performance Green Buildings Except Low-Rise Residential Buildings'. NREL performed this evaluation by examining the results of predictions for site energy use from a comprehensive set of EnergyPlus models. NREL has conducted an 'order-of-magnitude' analysis in this study to identify the likely overall impact of adopting Standard 189.1-2009 over ANSI/ASHRAE/IESNA Standard 90.1-2007.

  3. Production of Working Reference Materials for the Capability Evaluation Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillip D. Noll, Jr.; Robert S. Marshall

    1999-03-01

    Nondestructive waste assay (NDA) methods are employed to determine the mass and activity of waste-entrained radionuclides as part of the National TRU (Trans-Uranic) Waste Characterization Program. In support of this program the Idaho National Engineering and Environmental Laboratory Mixed Waste Focus Area developed a plan to acquire capability/performance data on systems proposed for NDA purposes. The Capability Evaluation Project (CEP) was designed to evaluate the NDA systems of commercial contractors by subjecting all participants to identical tests involving 55 gallon drum surrogates containing known quantities and distributions of radioactive materials in the form of sealed-source standards, referred to as working reference materials (WRMs). Although numerous Pu WRMs already exist, the CEP WRM set allows for the evaluation of the capability and performance of systems with respect to waste types/configurations which contain increased amounts of {sup 241}Am relative to weapons grade Pu, waste that is dominantly {sup 241}Am, as well as wastes containing various proportions of depleted uranium. The CEP WRMs consist of a special mixture of PuO{sub 2}/AmO{sub 2} (IAP) and diatomaceous earth (DE) or depleted uranium (DU) oxide and DE and were fabricated at Los Alamos National Laboratory. The IAP WRMS are contained inside a pair of welded inner and outer stainless steel containers. The DU WRMs are singly contained within a stainless steel container equivalent to the outer container of the IAP standards. This report gives a general overview and discussion relating to the production and certification of the CEP WRMs.

  4. Evaluation of a draft standard on performance specifications for health physics instrumentation. Initial results for radiological tests

    International Nuclear Information System (INIS)

    Swinth, K.L.; Kenoyer, J.L.; Mileham, A.P.; Kathren, R.L.; Selby, J.M.

    1983-06-01

    The draft ANSI standard N42.17D2 on performance specifications for health physics instrumentation is currently being evaluated by the Pacific Northwest Laboratory. The primary objective of the project is the evaluation of the applicability and practicality of the proposed standard through testing of a cross-section of currently available commercial instruments to determine how well they conform to the standard. The standard is being tested against instruments such as ionization chambers, G.M. detectors, alpha survey meters, and neutron dose equivalent survey meters. This paper presents results of the preliminary radiological performance tests on ionization chambers and G.M. detectors. This includes both the data generated during the tests and a discussion of procedures developed to perform the testing. Results are reported for response time, accuracy, precision, radiation overloads, and angular dependence. In addition, results are reported for parameters that affect instrument performance including battery lifetime, geotropism and stability. Initial test indicates that some of the instruments will not meet the criteria specified in ANSI N42.17D2. Results cover approximately 40 instruments that have been obtained by direct purchase, by loan from instrument vendors or by loan from others including DOE licensees

  5. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  6. Performance Evaluation of Five Turbidity Sensors in Three Primary Standards

    Science.gov (United States)

    Snazelle, Teri T.

    2015-10-28

    Open-File Report 2015-1172 is temporarily unavailable.Five commercially available turbidity sensors were evaluated by the U.S. Geological Survey, Hydrologic Instrumentation Facility (HIF) for accuracy and precision in three types of turbidity standards; formazin, StablCal, and AMCO Clear (AMCO–AEPA). The U.S. Environmental Protection Agency (EPA) recognizes all three turbidity standards as primary standards, meaning they are acceptable for reporting purposes. The Forrest Technology Systems (FTS) DTS-12, the Hach SOLITAX sc, the Xylem EXO turbidity sensor, the Yellow Springs Instrument (YSI) 6136 turbidity sensor, and the Hydrolab Series 5 self-cleaning turbidity sensor were evaluated to determine if turbidity measurements in the three primary standards are comparable to each other, and to ascertain if the primary standards are truly interchangeable. A formazin 4000 nephelometric turbidity unit (NTU) stock was purchased and dilutions of 40, 100, 400, 800, and 1000 NTU were made fresh the day of testing. StablCal and AMCO Clear (for Hach 2100N) standards with corresponding concentrations were also purchased for the evaluation. Sensor performance was not evaluated in turbidity levels less than 40 NTU due to the unavailability of polymer-bead turbidity standards rated for general use. The percent error was calculated as the true (not absolute) difference between the measured turbidity and the standard value, divided by the standard value.The sensors that demonstrated the best overall performance in the evaluation were the Hach SOLITAX and the Hydrolab Series 5 turbidity sensor when the operating range (0.001–4000 NTU for the SOLITAX and 0.1–3000 NTU for the Hydrolab) was considered in addition to sensor accuracy and precision. The average percent error in the three standards was 3.80 percent for the SOLITAX and -4.46 percent for the Hydrolab. The DTS-12 also demonstrated good accuracy with an average percent error of 2.02 percent and a maximum relative standard

  7. The EPIC nutrient database project (ENDB): a first attempt to standardize nutrient databases across the 10 European countries participating in the EPIC study

    DEFF Research Database (Denmark)

    Slimani, N.; Deharveng, G.; Unwin, I.

    2007-01-01

    because there is currently no European reference NDB available. Design: A large network involving national compilers, nutritionists and experts on food chemistry and computer science was set up for the 'EPIC Nutrient DataBase' ( ENDB) project. A total of 550-1500 foods derived from about 37 000...... standardized EPIC 24-h dietary recalls (24-HDRS) were matched as closely as possible to foods available in the 10 national NDBs. The resulting national data sets ( NDS) were then successively documented, standardized and evaluated according to common guidelines and using a DataBase Management System...

  8. 24 CFR 982.504 - Voucher tenancy: Payment standard for family in restructured subsidized multifamily project.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Voucher tenancy: Payment standard... ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM Rent and Housing Assistance Payment § 982.504 Voucher tenancy: Payment standard for family in restructured subsidized multifamily project. (a) This section applies to...

  9. Stress Corrosion Cracking of Pipeline Steels in Fuel Grade Ethanol and Blends - Study to Evaluate Alternate Standard Tests and Phenomenological Understanding of SCC

    Science.gov (United States)

    2011-10-30

    Main aim of this project was to evaluate alternate standard test methods for stress corrosion cracking (SCC) and compare them with the results from slow strain rate test (SSRT) results under equivalent environmental conditions. Other important aim of...

  10. Development of a volumetric projection technique for the digital evaluation of field of view.

    Science.gov (United States)

    Marshall, Russell; Summerskill, Stephen; Cook, Sharon

    2013-01-01

    Current regulations for field of view requirements in road vehicles are defined by 2D areas projected on the ground plane. This paper discusses the development of a new software-based volumetric field of view projection tool and its implementation within an existing digital human modelling system. In addition, the exploitation of this new tool is highlighted through its use in a UK Department for Transport funded research project exploring the current concerns with driver vision. Focusing specifically on rearwards visibility in small and medium passenger vehicles, the volumetric approach is shown to provide a number of distinct advantages. The ability to explore multiple projections of both direct vision (through windows) and indirect vision (through mirrors) provides a greater understanding of the field of view environment afforded to the driver whilst still maintaining compatibility with the 2D projections of the regulatory standards. Field of view requirements for drivers of road vehicles are defined by simplified 2D areas projected onto the ground plane. However, driver vision is a complex 3D problem. This paper presents the development of a new software-based 3D volumetric projection technique and its implementation in the evaluation of driver vision in small- and medium-sized passenger vehicles.

  11. Crew Transportation Technical Standards and Design Evaluation Criteria

    Science.gov (United States)

    Lueders, Kathryn L.; Thomas, Rayelle E. (Compiler)

    2015-01-01

    Crew Transportation Technical Standards and Design Evaluation Criteria contains descriptions of technical, safety, and crew health medical processes and specifications, and the criteria which will be used to evaluate the acceptability of the Commercial Providers' proposed processes and specifications.

  12. Features of the standard evaluation of agricultural land in 2017

    Directory of Open Access Journals (Sweden)

    Володимир Опара

    2017-09-01

    Full Text Available Normative pecuniary valuation of land belongs to important economic regulators of land relations in Ukraine. Indicators of monetary valuation of land plots are used to determine the size of the land tax, the State duty at exchange, inheritance and the donation of land rent for land plots of the state and communal property, loss of agricultural and forestry production, as well as in the development of indicators and economic mechanisms to stimulate rational use and protection of lands. Normative monetary valuation of agricultural land is defined according to the standards of capitalized rent income on land for agricultural purposes and indicators of soils bonitet by drafting evaluation scales of agroindustrial groups of soils in natural agricultural areas. Index of standard capitalized rent on income reflects the profitability of a business. The soil differences appear on soil maps and they are the main target of the regulatory evaluation. The main source of information about the soil cover of agricultural land should actually be made by Derzhgeocadastr archives and its subordinate State enterprises according to the results of standard evaluation of a single agricultural land plot under the territorial authority of Derzhgeocadastr through administrative services at the location of the land. An extract from the technical documentation about the regulatory assessments of land must be published in time not exceeding three working days from the date of receipt of the corresponding application. The introduction of new methodological approach to the standard evaluation of agricultural lands involves the simplification of access of landowners and land users to data evaluation, based on possible continuous evaluation of administrative districts and providing information about the assessment of the particular land plot in the form of extract from the technical documentation of the standard evaluation, which will be determined on the basis of standard

  13. Projection pursuit water quality evaluation model based on chicken swam algorithm

    Science.gov (United States)

    Hu, Zhe

    2018-03-01

    In view of the uncertainty and ambiguity of each index in water quality evaluation, in order to solve the incompatibility of evaluation results of individual water quality indexes, a projection pursuit model based on chicken swam algorithm is proposed. The projection index function which can reflect the water quality condition is constructed, the chicken group algorithm (CSA) is introduced, the projection index function is optimized, the best projection direction of the projection index function is sought, and the best projection value is obtained to realize the water quality evaluation. The comparison between this method and other methods shows that it is reasonable and feasible to provide decision-making basis for water pollution control in the basin.

  14. Nuclear data project evaluation activity report. October 1998 - October 2000

    Energy Technology Data Exchange (ETDEWEB)

    Akovali, Y; Blackmon, J; Radford, D; Smith, M [Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN (United States)

    2001-02-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report.

  15. Nuclear data project evaluation activity report. October 1998 - October 2000

    International Nuclear Information System (INIS)

    Akovali, Y.; Blackmon, J.; Radford, D.; Smith, M.

    2001-01-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report

  16. EVALUATION CRITERIA OF INNOVATIVE SOCIAL INVESTMENT PROJECTS IN HEALTH CARE

    Directory of Open Access Journals (Sweden)

    Vadim Aleksandrovich Lomazov

    2013-11-01

    Full Text Available Purpose: analysis of key indicators and creation of evaluation criteria of innovative socio-economic investment projects in healthcare, implemented on the basis of public-private partnerships.Methodology: there has been performed comprehensive assessment of specialized socio-economic projects in health sector taking into consideration interests of participants in the project (public and private, main aspects (medical, social, economic, scientific and innovative, and assessment components (presumable effectiveness or risk during implementation of the project. The degree of relative importance of the factors considered in each level, and the levels themselves are determined by experts with the help of paired comparisons method. The values of the project indicators are estimated against nonuniform grading scale, both the results of direct measurements and expert information being used.Results: There has been suggested an approach and a procedure for evaluating projects based on the allocation of interests, issues and evaluation components of the project as sub-criteria levels of the hierarchy analysis method; there has been developed research prototype of information analysis system for assessment of projects on the basis of the proposed approach.DOI: http://dx.doi.org/10.12731/2218-7405-2013-8-48

  17. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  18. Standard characterization of soils employed in the FAO/IAEA phosphate project

    International Nuclear Information System (INIS)

    Montange, D.; Zapata, F.

    2002-01-01

    In the frame of the FAO/IAEA networked research project, the agronomic effectiveness of natural and modified phosphate rock (PR) products was evaluated using nuclear and related techniques under a variety of soil, climate and management conditions. In addition to the local soil analyses, it was decided to make a standard characterization of the soils employed in the project to gather direct and comparable information on the relevant soil properties affecting the suitability of PRs for direct application and to better interpret the results from the agronomic evaluation, including the creation of a database for phosphate modelling. This paper describes the standard characterization of soils, that was mainly made at CIRAD, Montpellier, France. A total of 51 soil samples were analyzed from 15 countries including Belarus (1), Brazil (2), Chile (3), China (20), Cuba (2) Ghana (6), Hungary (2), Indonesia (3), Kenya (1), Malaysia (1), Poland (1), Romania (2), Russia (1), Thailand (3) and Venezuela (3). Methods of analyses used for the soil characterization included textural class, pH, chemical analysis for total N and P, and exchangeable elements (CEC, saturation). Available P was measured using 4 methods including Olsen, Bray II, Pi paper and Resin. Available P measurements using resin method were made at CENA, Piracicaba, Brazil. The soil P dynamics was described using the 32 P isotope exchange kinetic method at CEN Cadarache, France with the same soil samples. As a result of the worldwide distribution of the soils employed in the project, the results showed a very large diversity in each of the measured soil characteristics. The analysis of the data focused on the most representative tropical acid soils, i.e. Ultisols and Oxisols. Inceptisols have also been included because most of them were acid and located in the tropics and subtropics. Results are synthesized and analyzed with particular emphasis on: i) identification of the most relevant soil characteristics

  19. Standardization of MIP technique in three-dimensional CT portography: usefulness in evaluation of portosystemic collaterals in cirrhotic patients

    International Nuclear Information System (INIS)

    Kim, Jong Gi; Kim, Yong; Kim, Chang Won; Lee, Jun Woo; Lee, Suk Hong

    2003-01-01

    To assess the usefulness of three-dimensional CT portography using a standardized maximum intensity projection (MIP) technique for the evaluation of portosystemic collaterals in cirrhotic patients. In 25 cirrhotic patients with portosystemic collaterals, three-phase CT using a multide-tector-row helical CT scanner was performed to evaluate liver disease. Late arterial-phase images were transferred to an Advantage Windows 3.1 workstation (Gener Electric). Axial images were reconstructed by means of three-dimensional CT portography, using both a standardized and a non-standardized MIP technique, and the respective reconstruction times were determined. Three-dimensional CT portography with the standardized technique involved eight planes, namely the spleno-portal confluence axis (coronal, lordotic coronal, lordotic coronal RAO 30 .deg. C, and lordotic coronal LAO 30 .deg. C), the left renal vein axis (lordotic coronal), and axial MIP images (lower esophagus level, gastric fundus level and splenic hilum). The eight MIP images obtained in each case were interpreted by two radiologists, who reached a consensus in their evaluation. The portosystemic collaterals evaluated were as follows: left gastric vein dilatation; esophageal, paraesophageal, gastric, and splenic varix; paraumbilical vein dilatation; gastro-renal, spleno-renal, and gastro-spleno-renal shunt; mesenteric, retroperitoneal, and omental collaterals. The average reconstruction time using the non-standardized MIP technique was 11 minutes 23 seconds, and with the standardized technique, the time was 6 minutes 5 seconds. Three-dimensional CT portography with the standardized technique demonstrated left gastric vein dilatation (n=25), esophageal varix (n=18), paraesophageal varix (n=13), gastric varix (n=4), splenic varix (n=4), paraumbilical vein dilatation (n=4), gastro-renal shunt (n=3), spleno-renal shunt (n=3), and gastro-spleno-renal shunt (n=1). Using three-dimensional CT protography and the non-standardized

  20. Evaluation of China's local enforcement of energy efficiency standards and labeling programs for appliances and equipment

    International Nuclear Information System (INIS)

    Khanna, Nina Zheng; Zhou, Nan; Fridley, David; Fino-Chen, Cecilia

    2013-01-01

    Aims: This paper aims to evaluate local enforcement of China's mandatory appliance and equipment energy efficiency standards and labeling programs, two increasingly important policies for meeting national energy and carbon reduction targets. The expected energy savings of efficiency standards and labels can be fully realized only with strong enforcement to ensure compliance for all products sold. This paper provides comprehensive retrospective evaluation of the methodologies, results, progress and remaining challenges in pilot enforcement projects initiated in the absence of consistent national check-testing focused on energy efficiency. Scope: This paper's scope is focused on 2006–2009 pilot local check-tests conducted to verify appliance and equipment compliance with China's mandatory energy label and efficiency standards. Conclusions: This paper finds both improvement and some backsliding in compliance rates over time. Compared to earlier efforts, 2009 check-tests covered a wider regional and product scope but demonstrated greater variation in compliance rates. Labeling display and energy efficiency compliance was generally high across regions and most products, but lower compliance rates were observed in less economically developed regions and for lighting and industrial products. Based on these findings, areas for improvement in local awareness, product sampling methodology, check-testing tools and procedures are identified. - Highlights: • China's mandatory standards and labeling crucial to national energy saving goals. • China's 2006–2009 pilot efficiency check-testing for standards and labeling evaluated. • Wider geographic and product scope in 2009, but greater variation in compliance. • Generally high compliance, but lower rates for less economically developed region. • Local check-test capacity improving but methodological challenges remain

  1. Evaluation of Patient-Oriented Standards of Joint Commission International in Gilan and Mazandaran Teaching Hospitals

    Directory of Open Access Journals (Sweden)

    Ghaseminejhad

    2016-08-01

    Full Text Available Background Medical tourism, a multi-million-dollar industry, has had a significant effect in economic flourishing, creating jobs, and preventing the outflow of currency. Objectives The aim of this study was to evaluate teaching hospitals affiliated to Gilan and Mazandaran University of Medical Sciences, according to joint commission international (JCI standards. Methods This was a descriptive cross sectional study conducted among teaching hospitals affiliated to Gilan and Mazandaran University of Medical Sciences during year 2015. To collect data and evaluate the hospitals, patient-oriented standards of JCI was applied. Results Amongst the eight standards, international patient safety goals (IPSG (with a score of 87.5% had the highest, and patient and family education (PFE (with a score of 53.75% had the lowest score. Hospital “4” with a score of 90.41%, had the highest, and hospital “7” with 58.90%, had the lowest rate of compliance to the standards. According to the Mann-Whitney test, the observed statistics considering a P value of ≤ 0.05 level, was not significant, therefore on a 95% certainty level, there was no significant difference between hospitals in Gilan and Mazandaran, regarding compliance with standards. Overall, the hospitals under study were relatively prepared for attracting medical tourists. Conclusions According to the results, it seems that more planning and implementation of projects is required to strengthen the axes of the joint commission regarding accreditation of hospitals and attraction of medical tourists to these centers, especially foreign tourists. Researchers are recommended to pay special attention to the university of medical sciences of two provinces for the establishment of standards and utilization of professional consultants.

  2. Business transactions and standards. Towards a system of concepts and a method for early problem identification in standard implementation projects

    NARCIS (Netherlands)

    Rukanova, B.D.

    2005-01-01

    To summarize, with respect to research question one we constructed a system of concepts, while in answer to research question two we proposed a method of how to apply this system of concepts in practice in order to identify potential problems in early stages of standard implementation projects.

  3. CHARACTERISTICS OF MIRR METHOD IN EVALUATION OF INVESTMENT PROJECTS' EFFECTIVENESS

    OpenAIRE

    P. Kukhta

    2014-01-01

    There were analyzed characteristics of the Modified Internal Rate of Return method in the evaluation of investment projects, restrictions connected with its application, advantages and disadvantages compared with indicators of the original Internal Rate of Return and Net Present Value for projects with certain baseline characteristics. It was determined opportunities to adapt the method of Modified Internal Rate of Return to alternative computational approaches of the project cash flows evalu...

  4. Evaluating Stream Restoration Projects: What Do We Learn from Monitoring?

    Directory of Open Access Journals (Sweden)

    Zan Rubin

    2017-02-01

    Full Text Available Two decades since calls for stream restoration projects to be scientifically assessed, most projects are still unevaluated, and conducted evaluations yield ambiguous results. Even after these decades of investigation, do we know how to define and measure success? We systematically reviewed 26 studies of stream restoration projects that used macroinvertebrate indicators to assess the success of habitat heterogeneity restoration projects. All 26 studies were previously included in two meta-analyses that sought to assess whether restoration programs were succeeding. By contrast, our review focuses on the evaluations themselves, and asks what exactly we are measuring and learning from these evaluations. All 26 studies used taxonomic diversity, richness, or abundance of invertebrates as biological measures of success, but none presented explicit arguments why those metrics were relevant measures of success for the restoration projects. Although changes in biodiversity may reflect overall ecological condition at the regional or global scale, in the context of reach-scale habitat restoration, more abundance and diversity may not necessarily be better. While all 26 studies sought to evaluate the biotic response to habitat heterogeneity enhancement projects, about half of the studies (46% explicitly measured habitat alteration, and 31% used visual estimates of grain size or subjectively judged ‘habitat quality’ from protocols ill-suited for the purpose. Although the goal of all 26 projects was to increase habitat heterogeneity, 31% of the studies either sampled only riffles or did not specify the habitats sampled. One-third of the studies (35% used reference ecosystems to define target conditions. After 20 years of stream restoration evaluation, more work remains for the restoration community to identify appropriate measures of success and to coordinate monitoring so that evaluations are at a scale capable of detecting ecosystem change.

  5. Evaluating Development Projects and Programmes in Africa: The ...

    African Journals Online (AJOL)

    evaluation. It is indicated that NEPAD has not prescribed any internal or external monitoring and evaluation of its projects and programmes, and therefore calls into doubt the level of professional competence in its delivery strategies. The article also examines selected monitoring and evaluation strategies such as the African

  6. Evaluation model applied to TRANSPETRO's Marine Terminals Standardization Program

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de; Mueller, Gabriela [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Garcia, Luciano Maldonado [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes an innovative evaluation model applied to TRANSPETRO's 'Marine Terminals Standardization Program' based on updating approaches of programs evaluation and organizational learning. Since the program was launched in 2004, the need for having an evaluation model able to evaluate its implementation progress, to measure the degree of standards compliance and its potential economic, social and environmental impacts has become evident. Within a vision of safe and environmentally responsible operations of marine terminals, this evaluation model was jointly designed by TRANSPETRO and PUC-Rio to promote continuous improvement and learning in operational practices and in the standardization process itself. TRANSPETRO believes that standardization supports its services and management innovation capability by creating objective and internationally recognized parameters, targets and metrology for its business activities. The conceptual model and application guidelines for this important tool are presented in this paper, as well as the next steps towards its implementation. (author)

  7. CHARACTERISTICS OF MIRR METHOD IN EVALUATION OF INVESTMENT PROJECTS' EFFECTIVENESS

    Directory of Open Access Journals (Sweden)

    P. Kukhta

    2014-09-01

    Full Text Available There were analyzed characteristics of the Modified Internal Rate of Return method in the evaluation of investment projects, restrictions connected with its application, advantages and disadvantages compared with indicators of the original Internal Rate of Return and Net Present Value for projects with certain baseline characteristics. It was determined opportunities to adapt the method of Modified Internal Rate of Return to alternative computational approaches of the project cash flows evaluation.

  8. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of thermal environment for creating comfortable living space; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kaitekina seikatsu kukan no sozo no tame no onnetsu kankyo no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of proposing to ISO a thermal environment evaluation method, development has been performed on an evaluation technology to evaluate comfort and discomfort in non-constant and non-uniform thermal environment, and research has been carried out on structuring an evaluation standard. This paper summarizes the achievements in fiscal 2000. In developing the evaluation technology by using a 'human body thermal model' it was verified that the 'human body thermal model' being the achievement of the project to develop the human sensitivity measurement applied technology is effective as a method to evaluate non-uniform thermal environment, as a result of the experimental verification of the human testees. With regard to the effects on human body of thermal transient based on the testee experiment, such basic findings were derived that the thermal transient affects the psychological reaction even after movement, and that thermal sensitivity of aged persons of both sexes, and young generation shows greater positional difference in peripheral sections than in the trunk sections. The major standard being the object of this research is ISO 7730, for which discussions were given on the revision draft for the floor heating standard and the transient standard, the evaluation method using a human body model, and the evaluation method using a thermal mannequin as the new standards. (NEDO)

  9. International Reactor Physics Experiment Evaluation (IRPhE) Project. IRPhE Handbook - 2015 edition

    International Nuclear Information System (INIS)

    Bess, John D.; Gullifor, Jim

    2015-03-01

    The purpose of the International Reactor Physics Experiment Evaluation (IRPhE) Project is to provide an extensively peer-reviewed set of reactor physics-related integral data that can be used by reactor designers and safety analysts to validate the analytical tools used to design next-generation reactors and establish the safety basis for operation of these reactors. This work of the IRPhE Project is formally documented in the 'International Handbook of Evaluated Reactor Physics Benchmark Experiments', a single source of verified and extensively peer-reviewed reactor physics benchmark measurements data. The evaluation process entails the following steps: Identify a comprehensive set of reactor physics experimental measurements data, Evaluate the data and quantify overall uncertainties through various types of sensitivity analysis to the extent possible, verify the data by reviewing original and subsequently revised documentation, and by talking with the experimenters or individuals who are familiar with the experimental facility, Compile the data into a standardized format, Perform calculations of each experiment with standard reactor physics codes where it would add information, Formally document the work into a single source of verified and peer reviewed reactor physics benchmark measurements data. The International Handbook of Evaluated Reactor Physics Benchmark Experiments contains reactor physics benchmark specifications that have been derived from experiments that were performed at nuclear facilities around the world. The benchmark specifications are intended for use by reactor designers, safety analysts and nuclear data evaluators to validate calculation techniques and data. Example calculations are presented; these do not constitute a validation or endorsement of the codes or cross-section data. The 2015 edition of the International Handbook of Evaluated Reactor Physics Benchmark Experiments contains data from 143 experimental series that were

  10. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  11. Evaluation of Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Thom, Ronald M.; Roegner, G. Curtis; Ebberts, Blaine D.; Skalski, John R.; Borde, Amy B.; Dawley, Earl; Coleman, Andre M.; Woodruff, Dana L.; Breithaupt, Stephen A.; Cameron, April; Corbett, C.; Donley, Erin E.; Jay, D. A.; Ke, Yinghai; Leffler, K.; McNeil, C.; Studebaker, Cindy; Tagestad, Jerry D.

    2012-05-01

    This is the seventh and final annual report of a project (2004–2010) addressing evaluation of the cumulative effects of habitat restoration actions in the 235-km-long lower Columbia River and estuary. The project, called the Cumulative Effects (CE) study, was conducted for the U.S. Army Corps of Engineers Portland District by a collaboration of research agencies led by the Pacific Northwest National Laboratory. We achieved the primary goal of the CE study to develop a methodology to evaluate the cumulative effects of habitat actions in the Columbia Estuary Ecosystem Restoration Program. We delivered 1) standard monitoring protocols and methods to prioritize monitoring activities; 2) the theoretical and empirical basis for a CE methodology using levels-of-evidence; 3) evaluations of cumulative effects using ecological relationships, geo-referenced data, hydrodynamic modeling, and meta-analyses; and 4) an adaptive management process to coordinate and coalesce restoration efforts in the LCRE. A solid foundation has been laid for future comprehensive evaluations of progress made by the Columbia Estuary Ecosystem Restoration Program to understand, conserve, and restore ecosystems in the lower Columbia River and estuary.

  12. The Second Futamura Projection for Type-Directed Partial Evaluation

    DEFF Research Database (Denmark)

    Grobauer, Bernd; Yang, Zhe

    2001-01-01

    ', syntax-directed partial evaluation and TDPE, this derivation involves several conceptual and technical steps. These include a suitable formulation of the second Futamura projection and techniques for using TDPE to specialize type-indexed programs. In the context of the second Futamura projection, we also...... compare and relate TDPE with conventional offline partial evaluation. We demonstrate our technique with several examples, including compiler generation for Tiny, a prototypical imperative language....

  13. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  14. A method multi criterio to evaluate projects of rural electrification

    International Nuclear Information System (INIS)

    Gonzalez Posse, E.

    1994-01-01

    In this document about the problem of the evaluation projects methodologies in rural electrification.The low analysis problem is of complex nature, because each project is evaluation object and an economic agent. One of these agents identifies different benefits and cost, and also has a different approaches for value them.In consequence, the form in that it is carried out the evaluation of the one project for each one of this agents that it is usually solved for mechanisms linked to the capacity of incidence or of determination of each one of them, this does not assures a satisfactory results for the general interest

  15. Fiscal 2000 comprehensive survey. Project for development of international standards for supporting novel industries; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo. Sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Research and development for creation of international standards had been under way for three years since fiscal 1998 for the sustenance and securement of Japan's technical advantage and for the enhancement of the international competitiveness of its industries. In the ultimate fiscal year for the project, studies were made for establishing standards relative to 13 subjects, involving the management of color reproduction, assurance of interoperability of optical disk systems, digital image processing for home-use digital electronic appliances, securement of connection between information devices for home-use electric appliances, production process system, method for testing and evaluating fine ceramics for communication equipment, method for evaluating high-temperature properties of new glass, method for testing and evaluating corrosion resistance of surface treated steel sheets, method for testing and evaluating pure titanium, method for testing and evaluating plastic optical fiber, method for evaluating properties of high-strength large-diameter steel pipe for ultrahigh-pressure natural gas pipeline, method for measuring fuel consumption of hybrid electric vehicles, method for calculating the recycling rate of automotive products, or the like. The fruits of 77% of the efforts have already been proposed as international standards or have arrived at a stage where they may be proposed as such. (NEDO)

  16. Fiscal 2000 comprehensive survey. Project for development of international standards for supporting novel industries; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo. Sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Research and development for creation of international standards had been under way for three years since fiscal 1998 for the sustenance and securement of Japan's technical advantage and for the enhancement of the international competitiveness of its industries. In the ultimate fiscal year for the project, studies were made for establishing standards relative to 13 subjects, involving the management of color reproduction, assurance of interoperability of optical disk systems, digital image processing for home-use digital electronic appliances, securement of connection between information devices for home-use electric appliances, production process system, method for testing and evaluating fine ceramics for communication equipment, method for evaluating high-temperature properties of new glass, method for testing and evaluating corrosion resistance of surface treated steel sheets, method for testing and evaluating pure titanium, method for testing and evaluating plastic optical fiber, method for evaluating properties of high-strength large-diameter steel pipe for ultrahigh-pressure natural gas pipeline, method for measuring fuel consumption of hybrid electric vehicles, method for calculating the recycling rate of automotive products, or the like. The fruits of 77% of the efforts have already been proposed as international standards or have arrived at a stage where they may be proposed as such. (NEDO)

  17. Evaluation of Building Projects Using Earned Value Technique ...

    African Journals Online (AJOL)

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  18. Evaluation of the Higher Education Active Community Fund Project in Bournemouth

    OpenAIRE

    Apostolakis, Christos

    2005-01-01

    This report evaluates the Higher Education Active Community Fund (HEACF) Project from its first year in September 2002 to May 2005.The principle objective of the study was to evaluate the implementation of the HEACF project, its impact and its capacity to achieve the aims during this time. Based on research evidence the HEACF project introduced a holistic and systematic way of organising and developing volunteer activity at Bournemouth University. In addition to this, the project provided an ...

  19. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  20. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  1. Compilation and evaluation of high energy γ-ray standards from nuclear reactions. Work performed under the coordinated research project 'Update of X- and γ-ray decay data standards for detector calibration'

    International Nuclear Information System (INIS)

    Marcinkowski, A.; Marianski, B.

    1999-02-01

    The report presents the following aspects needed for the compilation and evaluation of high energy γ-ray standards from nuclear reactions: evaluation of emission probabilities of γ-rays with energies 4.44 MeV and 15.11 MeV from 12 C * , preparation of the list of reactions suitable for production of the above mentioned excited radionuclide, and compilation and evaluation of cross sections for these reactions, including inelastic proton scattering on 12 C and radiative capture on 11 B

  2. ASEAN-USAID buildings energy conservation project. Volume 1, Energy standards: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.D.; Busch, J.F. [eds.][Lawrence Berkeley Lab., CA (United States); Deringer, J.J. [Deringer Group, Riva, MD (United States)

    1992-06-01

    Mandatory or voluntary energy-efficiency standards for new or existing buildings can play an important role in a national program aimed at promoting energy conservation. Building codes and standards can provide a degree of control over design and building practices throughout the construction process, and encourage awareness of energy-conscious design. Studies in developed countries indicate that efficiency standards can produce energy reductions on the order of 20 to 40% or more. Within ASEAN, analyses of the savings potential from the proposed standards suggest that if implemented, these standards would produce savings over current new design practice of 19% to 24%. In this volume we provide an overview of the ASEAN-USAID project aimed at promulgating standards for energy efficiency in commercial buildings. The process of developing and implementing energy-efficiency standards for buildings can be subdivided into two key components: policy development; and technical and economic analysis. Each of these involves a number of steps and processes, as outlined in Figure 1-1. This volume describes the technical and economic analyses used to develop the proposed energy efficiency standards for four countries (Malaysia, Thailand, the Philippines, and Indonesia), and to refine an energy standard existing in Singapore since 1979. Though oriented toward the ASEAN region, the analysis methods described here are applicable in a range of settings, provided appropriate modifications are made for local building construction, climatic, economic, and political conditions. Implementation issues are not specifically addressed here; rather this volume is oriented towards the analytical work needed to establish or revise an energy standard for buildings.

  3. Expert system for economic evaluation of technological projects

    Directory of Open Access Journals (Sweden)

    Bohumil Hlavenka

    2001-01-01

    Full Text Available Apart from the technical level, a basic tool for decision-making and realization of the technical innovation project is also its economic effectiveness. It is assessed by comparing expenses and effects with respect to all-society interests and standards valid in a relevant period for the areas of technology, economy, ecology, safety of work, etc.

  4. Aligning research assessment in the Humanities to the national Standard Evaluation Protocol Challenges and developments in the Dutch research landscape

    Energy Technology Data Exchange (ETDEWEB)

    Prins, A.; Spaapen, J.; Van Vree, F

    2016-07-01

    The purpose of this session is a debate about innovation in comprehensive methods for the assessment of humanities research. Input will come from preliminary outcomes of an ongoing project in the Netherlands to find adequate indicators for humanities research that will fit in the national Standard Evaluation Protocol. The project includes processes of ‘bottom up’ data collection (that is, with input coming from the research community) and discussion with Humanities researchers, investigating the specific characteristics of publication and communication cultures in the Humanities, and the prospects for the use of quantitative and qualitative indicators. (Author)

  5. Virtual language learning environments: the standardization of evaluation

    Directory of Open Access Journals (Sweden)

    Francesca Romero Forteza

    2014-03-01

    Full Text Available Nowadays there are many approaches aimed at helping learners acquire knowledge through the Internet. Virtual Learning Environments (VLE facilitate the acquisition and practice of skills, but some of these learning platforms are not evaluated or do not follow a standard that guarantees the quality of the tasks involved. In this paper, we set out a proposal for the standardization of the evaluation of VLEs available on the World Wide Web. Thus, the main objective of this study is to establish an evaluation template with which to test whether a VLE is appropriate for computer-assisted language learning (CALL. In the methodology section, a learning platform is analysed and tested to establish the characteristics learning platforms must have. Having established the design of the template for language learning environments, we concluded that a VLE must be versatile enough for application with different language learning and teaching approaches.

  6. Computational methods for planning and evaluating geothermal energy projects

    International Nuclear Information System (INIS)

    Goumas, M.G.; Lygerou, V.A.; Papayannakis, L.E.

    1999-01-01

    In planning, designing and evaluating a geothermal energy project, a number of technical, economic, social and environmental parameters should be considered. The use of computational methods provides a rigorous analysis improving the decision-making process. This article demonstrates the application of decision-making methods developed in operational research for the optimum exploitation of geothermal resources. Two characteristic problems are considered: (1) the economic evaluation of a geothermal energy project under uncertain conditions using a stochastic analysis approach and (2) the evaluation of alternative exploitation schemes for optimum development of a low enthalpy geothermal field using a multicriteria decision-making procedure. (Author)

  7. FY 1999 project on the development of new industry support type international standards. Standardization of evaluation method of the genetic testing system (Separate volume); 1999 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka (bessatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The separate volume included the proceedings of the re-consignee joint meeting on the standardization of evaluation method of the genetic testing system, the proceedings/data of the meeting of the committee of the standardization of evaluation method of the genetic testing system, etc. The data of the meeting are about a plan to execute the standardization of evaluation method of the genetic testing system, standardization of forms for reporting the results of the genetic test, a trial guideline for standardization of the genetic testing, standardization of evaluation method of the genetic testing system, etc. Moreover, the volume included 11 literature papers overseas on the above-mentioned themes, 'reports on the surveys in Europe and the U.S. on the standardization of evaluation method of the genetic testing system,' etc. (NEDO)

  8. FY 1999 project on the development of new industry support type international standards. Standardization of evaluation method of the genetic testing system (Separate volume); 1999 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka (bessatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The separate volume included the proceedings of the re-consignee joint meeting on the standardization of evaluation method of the genetic testing system, the proceedings/data of the meeting of the committee of the standardization of evaluation method of the genetic testing system, etc. The data of the meeting are about a plan to execute the standardization of evaluation method of the genetic testing system, standardization of forms for reporting the results of the genetic test, a trial guideline for standardization of the genetic testing, standardization of evaluation method of the genetic testing system, etc. Moreover, the volume included 11 literature papers overseas on the above-mentioned themes, 'reports on the surveys in Europe and the U.S. on the standardization of evaluation method of the genetic testing system,' etc. (NEDO)

  9. Evaluation guide for the international reactor physics experiments evaluation project (IRPhEP)

    International Nuclear Information System (INIS)

    Yamaji, Akifumi

    2013-01-01

    At present, there is an urgent need to preserve integral reactor physics experimental data including separate or special effects data for nuclear energy and technology applications and the knowledge and competence contained therein. The International Reactor Physics Evaluation Project (IRPhEP) was initiated as a pilot activity in 1999 by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy Agency (NEA) Nuclear Science Committee (NSC). The project was endorsed as an official activity of the NSC in June of 2003. While coordination and administration of the IRPhEP takes place at an international level, each participating country is responsible for the administration, technical direction, and priorities of the project within their respective countries. This document outlines the general presentation guidelines that evaluators should follow for the description of the experiments and all relevant experimental data in order to ensure the consistency between the evaluations published in the final Handbook. Publication templates will be used to ensure this consistency and will follow the general scheme below: 1 - Experiment identification number; 2- Date; 3 - Name of experiment (Purpose of experiment, Phenomena measured and scope); 4 - Name or designation of experimental programme; 5 - Description of facility; 6 - Description of test or experiment (Experimental configuration, Core life cycle, Experimental limitations or shortcomings); 7 - Phenomena measured (Description of results and analysis, Special features and characteristics of experiment, Measurement systems/methods and uncertainties); 8 - Duplicate or complementary experiments / other related experiments; 9 - Status of completion of the evaluation; 10 - References (pointer to evaluation, archive if available, otherwise generic bibliographic reference); 11 - Authors/ organisers 12 - Material available

  10. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  11. Using Vector Projection Method to evaluate maintainability of mechanical system in design review

    International Nuclear Information System (INIS)

    Chen Lu; Cai Jianguo

    2003-01-01

    Maintainability of a mechanical system is one of the system design parameters that has a great impact in terms of ease of maintenance. In this article, based on the definition of the terms of maintenance and maintainability, an important tool of Design for Maintenance is developed as a way to improve maintainability through design. A set of standard and organized guidelines is provided and maintainability factors in terms of physical design, logistics support and ergonomics are identified. As a specific application of design review, a methodology so called Vector Projection Method is developed to evaluate the maintainability of the mechanical system. Lastly, an example is discussed

  12. National Skills Standards Development Program: Organization and Operation of Technical Committees To Develop National Skill Standards for Competency in the Electronics Industry. The Third Party Summative Evaluation of the Electronic Industries Foundation Project. Phase I & II. Final Report.

    Science.gov (United States)

    Losh, Charles

    The Electronics Industries Foundation was awarded a project to develop national entry-level standards and a certification system. Ten specialties were included: automotive electronics, avionics, biomedical electronics, business machines, consumer products electronics, general electronics, industrial electronics, instrumentation, microcomputer, and…

  13. APPROACHES FOR EVALUATING AND FINANCING INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    MARIA-LOREDANA POPESCU

    2011-04-01

    Full Text Available This article presents the financial investment approach and the investment evaluation methods, which are criteria for assessing both investment projects and their funding sources. An important role in the analysis carried out is played by the investment decision and financing decision quality. Making an investment decision implies computing the related investment efficiency indicators. They allow the comparison of several variants of the same investment project as well as their comparison with other projects in the same industry or in other industries. The financing decision concerns the selection between their own sources (share capital, depreciation fund, profits, reserve funds, additional capital, revenues from investments, attracted sources (domestic resource mobilization and borrowed sources (credits.

  14. Project Evaluation under Inflation Condition

    International Nuclear Information System (INIS)

    Hindy, M.; El Missiry, P.

    2004-01-01

    This paper analyzes the role of inflation in capital budgeting and attempts to introduce solutions to such implication in order to make the appropriate decision for the firm' stockholders under these circumstances. Inflation leads to biasness in evaluating the investment projects, due to its impact on the cash flow, the discount rate, the initial investment cost, and the depreciation. This paper has shown that the capital budgeting process is not neutral with respect to inflation, as the output prices will raise as well as the operating and capital expenditures will also be adjusted due to inflation. In addition, it has shown that it is reasonable to expect that the cost of capital will increase as a result of an increase in the real interest rate, the inflation premium, and the cost of equity. Of critical importance is the basis used in calculating the annual depreciation which may lead to the transfer of wealth from the investment projects to the government and will result in underestimating the net present value of the investment projects, if these depreciation charges is calculated based upon the historical values and not on the replacement cost of the fixed assets

  15. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B.J.; Liland, A.

    2003-01-01

    Full text: Experience after the Chernobyl accident has shown that remediation strategies need to consider a wide range of different issues to ensure the long-term sustainability of radioactively contaminated areas. The STRATEGY project (Sustainable Restoration And Long-Term Management Of Contaminated Rural, Urban And Industrial Ecosystems (www.strategy-ec.org.uk) had the overall objective of establishing a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project carried out a critical evaluation of a series of countermeasures and waste disposal options including a consideration of their technical feasibility and practicality and whether they (i) incur considerable direct or side-effect costs; (ii) have significant environmental side effects; and (iii) are acceptable to society. A main output was a comprehensive, documented evaluation of more than 100 countermeasures (in the form of standardized templates) that would be relevant for off-site nuclear emergency management in the mid to long term. Stakeholder participation is an important mechanism to explore these additional benefits or disadvantages to the use of countermeasures, and is an essential step in developing a decision framework which avoids problems previously experienced in emergency management. Close liaison with the FARMING stakeholder network facilitated evaluation of countermeasure templates for rural ecosystems. Stakeholder opinion suggested that some countermeasures were as likely to be rejected an socio-ethical grounds as technical and economic grounds. Rejection of specific countermeasures would be expected to show site, context and national differences. Suitable approaches for successfully communicating with a wide range of stakeholders were explored. The way in which countermeasure evaluation and selection is carried out is particularly relevant for ethical evaluation of remediation

  16. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Science.gov (United States)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  17. Evaluation of Virtual Teaching-Learning Environments based on usability standards

    Directory of Open Access Journals (Sweden)

    Jose I. Cocunubo-Suarez

    2018-01-01

    Full Text Available The main objective of this review article is to determine the necessary sub-characteristics or aspects for the evaluation of Virtual Teaching-Learning Environments (VTLEs as final or finished products based on ISO 9126, 14598 and 25000-SQuaRE standards. A systematic information search was carried out. A total of 108 documents were retrieved about subjects such as web usability, virtual learning environments, usability, educational software, educational web evaluation, usability evaluation and web usability evaluation. Out of the 108 documents, 70 were selected by inclusion and exclusion analysis. The eight subfeatures of greater statistical frequency were identified among the subset of documents and then integrated as a proposal for standard 25000-SQuaRE.

  18. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  19. Standard practice for conducting and evaluating laboratory corrosions tests in soils

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1999-01-01

    1.1 This practice covers procedures for conducting laboratory corrosion tests in soils to evaluate the corrosive attack on engineering materials. 1.2 This practice covers specimen selection and preparation, test environments, and evaluation of test results. 1.3 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  20. EMPLACEMENT GANTRY ITS STANDARDS IDENTIFICATION STUDY

    International Nuclear Information System (INIS)

    Voegele, M.

    2005-01-01

    To date, the project has established ITS performance requirements for SSCs based on identification and categorization of event sequences that may result in a radiological release. These performance requirements are defined within the NSDB. Further, SSCs credited with performing safe functions are classified as ITS. In turn, perform confirmation for these SSCs is sought through the use of consensus code and standards. The purpose of this study is to identify applicable codes and standards for the WP Emplacement Gantry ITS SSCs. Further, this study will form the basis for selection and the extent of applicability of each code and standard. This study is based on the design development completed for LA only. Accordingly, identification of ITS SSCs beyond those defined within the NSDB are based on designs that may be subject to further development during detail design. Furthermore, several design alternatives may still be under consideration to satisfy certain safety functions, and that final selection will not be determined until further design development has occurred. Therefore, for completeness, throughout this study alternative designs currently under considered will be discussed. Further, the results of this study will be subject to evaluation as part of a follow-on GAP analysis study. Based on the results of this study the GAP analysis will evaluate each code and standard to ensure each ITS performance requirement is fully satisfied. When a performance requirement is not fully satisfied a ''gap'' is highlighted. Thereafter, the study will identify supplemental requirements to augment the code or standard to meet performance requirements. Further, the GAP analysis will identify non-standard areas of the design that will be subject to a Development Plan. Non-standard components and non-standard design configurations are defined as areas of the design that do not follow standard industry practices or codes and standards. Whereby, performance confirmation cannot be

  1. Clinical Image Evaluation of Film Mammograms in Korea: Comparison with the ACR Standard

    International Nuclear Information System (INIS)

    Gwak, Yeon Joo; Kim, Hye Jung; Kwak, Jin Young; Son, Eun Ju; Ko, Kyung Hee; Lee, Jin Hwa; Lim, Hyo Soon; Lee, You Jin; Park, Ji Won; Shin, Kyung Min; Jang, Yun-Jin

    2013-01-01

    The goal of this study is to compare the overall quality of film mammograms taken according to the Korean standards with the American College of Radiology (ACR) standard for clinical image evaluation and to identify means of improving mammography quality in Korea. Four hundred and sixty eight sets of film mammograms were evaluated with respect to the Korean and ACR standards for clinical image evaluation. The pass and failure rates of mammograms were compared by medical facility types. Average scores in each category of the two standards were evaluated. Receiver operating characteristic curve analysis was used to identify an optimal Korean standard pass mark by taking the ACR standard as the reference standard. 93.6% (438/468) of mammograms passed the Korean standard, whereas only 80.1% (375/468) passed the ACR standard (p < 0.001). Non-radiologic private clinics had the lowest pass rate (88.1%: Korean standard, 71.8%: ACR standard) and the lowest total score (76.0) by the Korean standard. Average scores of positioning were lowest (19.3/29 by the Korean standard and 3.7/5 by the ACR standard). A cutoff score of 77.0 for the Korean standard was found to correspond to a pass level when the ACR standard was applied. We suggest that tighter regulations, such as, raising the Korean pass mark, subtracting more for severe deficiencies, or considering a very low scores in even a single category as failure, are needed to improve the quality of mammography in Korea

  2. Using ISO 25040 standard for evaluating electronic health record systems.

    Science.gov (United States)

    Oliveira, Marília; Novaes, Magdala; Vasconcelos, Alexandre

    2013-01-01

    Quality of electronic health record systems (EHR-S) is one of the key points in the discussion about the safe use of this kind of system. It stimulates creation of technical standards and certifications in order to establish the minimum requirements expected for these systems. [1] In other side, EHR-S suppliers need to invest in evaluation of their products to provide systems according to these requirements. This work presents a proposal of use ISO 25040 standard, which focuses on the evaluation of software products, for define a model of evaluation of EHR-S in relation to Brazilian Certification for Electronic Health Record Systems - SBIS-CFM Certification. Proposal instantiates the process described in ISO 25040 standard using the set of requirements that is scope of the Brazilian certification. As first results, this research has produced an evaluation model and a scale for classify an EHR-S about its compliance level in relation to certification. This work in progress is part for the acquisition of the degree of master in Computer Science at the Federal University of Pernambuco.

  3. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  4. A methodology to choose appropriate procurement standards in water and sewage projects

    Directory of Open Access Journals (Sweden)

    Pezhman Kouravand

    2013-12-01

    Full Text Available During the past few years, there have been increasing trend on building appropriate model for supplier selection and a good supplier, indeed, is capable of providing better quality products, which could lead to increase the productivity of an organization. In this paper, we present an empirical investigation to find the effect of monitoring three different standards, namely, domestic, national and international standard on improving the quality of products in rural water and sewage projects. The proposed model of this paper designs a questionnaire and distributes it among some experts in a Water & Sewage firm located in city of Ahvaz, Iran. Using the Pearson correlation ratio, the study examines three hypotheses of the survey and the results indicate that there were poor relationship between carefully considering domestic, national and international standards and improvement on quality of products offered by various suppliers. In addition, job experience and type of employment also do not seem to have any meaningful effect on quality assessment of suppliers.

  5. Assessment of external costs for transport project evaluation: Guidelines in some European countries

    Energy Technology Data Exchange (ETDEWEB)

    Petruccelli, Umberto, E-mail: umberto.petruccelli@unibas.it

    2015-09-15

    Many studies about the external costs generated by the transport system have been developed in the last twenty years. To standardize methodologies and assessment procedures to be used in the evaluation of the projects, some European countries recently have adopted specific guidelines that differ from each other in some aspects even sensibly. This paper presents a critical analysis of the British, Italian and German guidelines and is aimed at cataloguing the external cost types regarded and the assessment methods indicated as well as to highlight the differences of the results, in terms of applicability and reliability. The goal is to contribute to a European standardization process that would lead to the drafting of guidelines suited for all EU countries. - Highlights: • The analyzed guidelines agree on the methods to evaluate costs from air pollution, greenhouse gases and accidents. • They recommend respectively: dose-resp. approach; costs to reduce/permit emissions; whole direct, indirect and social costs. • For noise, DE guide indicates defensive expenditure or SP methods; IT guide, SP method; UK guide, the hedonic prices one. • For on territory impact, DE guide regards only the barrier effect; the IT one, also the soil consumption and system effects. • British guide proposes a qualitative methodology to estimate the impact on various landscapes and environments.

  6. Growth and Expansion of the International Criticality Safety Benchmark Evaluation Project and the Newly Organized International Reactor Physics Experiment Evaluation Project

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Yolanda Rugama; Enrico Satori

    2007-01-01

    Since ICNC 2003, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) has continued to expand its efforts and broaden its scope. Criticality-alarm/shielding type benchmarks and fundamental physics measurements that are relevant to criticality safety applications are not only included in the scope of the project, but benchmark data are also included in the latest version of the handbook. A considerable number of improvements have been made to the searchable database, DICE and the criticality-alarm/shielding benchmarks and fundamental physics measurements have been included in the database. There were 12 countries participating on the ICSBEP in 2003. That number has increased to 18 with recent contributions of data and/or resources from Brazil, Czech Republic, Poland, India, Canada, and China. South Africa, Germany, Argentina, and Australia have been invited to participate. Since ICNC 2003, the contents of the ''International Handbook of Evaluated Criticality Safety Benchmark Experiments'' have increased from 350 evaluations (28,000 pages) containing benchmark specifications for 3070 critical or subcritical configurations to 442 evaluations (over 38,000 pages) containing benchmark specifications for 3957 critical or subcritical configurations, 23 criticality-alarm-placement/shielding configurations with multiple dose points for each, and 20 configurations that have been categorized as fundamental physics measurements that are relevant to criticality safety applications in the 2006 Edition of the ICSBEP Handbook. Approximately 30 new evaluations and 250 additional configurations are expected to be added to the 2007 Edition of the Handbook. Since ICNC 2003, a reactor physics counterpart to the ICSBEP, The International Reactor Physics Experiment Evaluation Project (IRPhEP) was initiated. Beginning in 1999, the IRPhEP was conducted as a pilot activity by the by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy Agency

  7. Evaluation of Career Education Projects, 1976-1977. Report #7829.

    Science.gov (United States)

    Chern, Hermine J.; And Others

    Evaluations of thirty career education projects in the school district of Philadelphia, Pennsylvania are contained in this report. Fifteen of the projects concern classroom or shop instruction, six concern development and/or field testing of curriculum materials, and the remainder involve staff development, installation of shop equipment, job…

  8. Laboratory Evaluation of Air Flow Measurement Methods for Residential HVAC Returns for New Instrument Standards

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Iain [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stratton, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-08-01

    This project improved the accuracy of air flow measurements used in commissioning California heating and air conditioning systems in Title 24 (Building and Appliance Efficiency Standards), thereby improving system performance and efficiency of California residences. The research team at Lawrence Berkeley National Laboratory addressed the issue that typical tools used by contractors in the field to test air flows may not be accurate enough to measure return flows used in Title 24 applications. The team developed guidance on performance of current diagnostics as well as a draft test method for use in future evaluations. The study team prepared a draft test method through ASTM International to determine the uncertainty of air flow measurements at residential heating ventilation and air conditioning returns and other terminals. This test method, when finalized, can be used by the Energy Commission and other entities to specify required accuracy of measurement devices used to show compliance with standards.

  9. Chapter 2: Commercial and Industrial Lighting Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Energy Technology Data Exchange (ETDEWEB)

    Kurnik, Charles W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gowans, Dakers [Left Fork Energy, Harrison, NY (United States); Telarico, Chad [DNV GL, Mahwah, NJ (United States)

    2017-11-02

    The Commercial and Industrial Lighting Evaluation Protocol (the protocol) describes methods to account for gross energy savings resulting from the programmatic installation of efficient lighting equipment in large populations of commercial, industrial, and other nonresidential facilities. This protocol does not address savings resulting from changes in codes and standards, or from education and training activities. A separate Uniform Methods Project (UMP) protocol, Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol, addresses methods for evaluating savings resulting from lighting control measures such as adding time clocks, tuning energy management system commands, and adding occupancy sensors.

  10. Analysis and Development of a Project Evaluation Process.

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C.; Cada Glenn F.

    1985-01-01

    The Bonneville Power Administration has responsibility, assigned by the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (Public Law 96-501; 16 USC 839), for implementing the Columbia River Basin Fish and Wildlife Program of the Northwest Power Planning Council. One aspect of this responsibility is evaluation of project proposals and ongoing and completed projects. This report recommends formalized procedures for conducting this work in an accurate, professional, and widely respected manner. Recommendations and justifications are based largely on interviews with federal and state agencies and Indian tribes in the Northwest and nationally. Organizations were selected that have evaluation systems of their own, interact with the Fish and Wildlife Program, or have similar objectives or obligations. Perspective on aspects to be considered were obtained from the social science of evaluation planning. Examples of procedures and quantitative criteria are proposed. 1 figure, 2 tables.

  11. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  12. Standard guide for conducting and evaluating galvanic corrosion tests in electrolytes

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1981-01-01

    1.1 This guide covers conducting and evaluating galvanic corrosion tests to characterize the behavior of two dissimilar metals in electrical contact in an electrolyte under low-flow conditions. It can be adapted to wrought or cast metals and alloys. 1.2 This guide covers the selection of materials, specimen preparation, test environment, method of exposure, and method for evaluating the results to characterize the behavior of galvanic couples in an electrolyte. Note 1—Additional information on galvanic corrosion testing and examples of the conduct and evaluation of galvanic corrosion tests in electrolytes are given in Refs (1) through (7). 1.3 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicabil...

  13. Meeting the Standards for Foreign Language Leaming through an Internet-Based Newspaper Project: Case Studies of Advanced-Level Japanese Learners

    Directory of Open Access Journals (Sweden)

    Miyuki Fukai

    2005-01-01

    Full Text Available Published in 1996, the Standards far Foreign Language Learning (Standards, define knowledge and abilities that foreign language learners should acquire in the U.S. The Internet is believed to facilitate standards-based instruction because of its capabilities as a communication medium, information provider, and publication tool. This paper presents one part of a study that investigated this claim through examining an Internet-based newspaper project in an advanced-level college Japanese course in light of the Japanese Standards. Six students were selected to serve as case studies, with their experiences in relation to this project analyzed in depth. The results show that the students found using the Internet to read authentic materials with the help of an online dictionary to be a positive experience. This then resulted in their actively using Japanese for personal enjoyment outside the classroom. These results suggest that the project was particularly successful in two goal areas: Communication and Communities.

  14. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  15. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    Science.gov (United States)

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  16. THESEUS - a research project to improve the safety standard of tank vehicles for dangerous goods

    International Nuclear Information System (INIS)

    Guenther, B.

    1992-01-01

    A research project reffered to as THESEUS was initiated by the Federal Ministry of Research and Technology of Germany. The intent of the investigation is to generate measures designed to enhance the safety standard of commercial transports of dangerous goods in tank vehicles. Hereby, the analysis of real accidents by teams within the project will provide the relevant parameters for the experimental and theoretical investigation of vehicles, tank components and safety devices. The project started in summer 1990. This paper will focus main features and the work done so far. Special consideration will be made to the failure behaviour of tank components as the authors field of activity. (orig.)

  17. Socio-economic project evaluation in practice

    International Nuclear Information System (INIS)

    Larsen, A.

    1995-01-01

    The theoretical basis for a socio-economic project evaluation can be doubtful and specific analyses can involve quite essential uncertainty. Among serious theoretical problems of the energy sector there should be named the price distortions, due to various taxes. The choice of the presumed calculation interest can be difficult, due to the extremely long-range energy-political planning. (EG) 10 refs

  18. Evaluating Clustering in Subspace Projections of High Dimensional Data

    DEFF Research Database (Denmark)

    Müller, Emmanuel; Günnemann, Stephan; Assent, Ira

    2009-01-01

    Clustering high dimensional data is an emerging research field. Subspace clustering or projected clustering group similar objects in subspaces, i.e. projections, of the full space. In the past decade, several clustering paradigms have been developed in parallel, without thorough evaluation...... and comparison between these paradigms on a common basis. Conclusive evaluation and comparison is challenged by three major issues. First, there is no ground truth that describes the "true" clusters in real world data. Second, a large variety of evaluation measures have been used that reflect different aspects...... of the clustering result. Finally, in typical publications authors have limited their analysis to their favored paradigm only, while paying other paradigms little or no attention. In this paper, we take a systematic approach to evaluate the major paradigms in a common framework. We study representative clustering...

  19. Setting standards and detecting intrajudge inconsistency using interdependent evaluation of response alternatives

    NARCIS (Netherlands)

    Chang, Lei; van der Linden, Willem J.; Vos, Hendrik J.

    2004-01-01

    This article introduces a new test-centered standard-setting method as well as a procedure to detect intrajudge inconsistency of the method. The standard-setting method that is based on interdependent evaluations of alternative responses has judges closely evaluate the process that examinees use to

  20. Anthropometric protocols for the construction of new international fetal and newborn growth standards: the INTERGROWTH-21st Project.

    Science.gov (United States)

    Cheikh Ismail, L; Knight, H E; Bhutta, Z; Chumlea, W C

    2013-09-01

    The primary aim of the INTERGROWTH-21(st) Project is to construct new, prescriptive standards describing optimal fetal and preterm postnatal growth. The anthropometric measurements include the head circumference, recumbent length and weight of the infants, and the stature and weight of the parents. In such a large, international, multicentre project, it is critical that all study sites follow standardised protocols to ensure maximal validity of the growth and nutrition indicators used. This paper describes, in detail, the selection of anthropometric personnel, equipment, and measurement and calibration protocols used to construct the new standards. Implementing these protocols at each study site ensures that the anthropometric data are of the highest quality to construct the international standards. © 2013 Royal College of Obstetricians and Gynaecologists.

  1. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  2. An Overview of the International Reactor Physics Experiment Evaluation Project

    International Nuclear Information System (INIS)

    Briggs, J. Blair; Gulliford, Jim

    2014-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties associated with advanced modeling and simulation accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. Two Organization for Economic Cooperation and Development (OECD) Nuclear Energy Agency (NEA) activities, the International Criticality Safety Benchmark Evaluation Project (ICSBEP), initiated in 1992, and the International Reactor Physics Experiment Evaluation Project (IRPhEP), initiated in 2003, have been identifying existing integral experiment data, evaluating those data, and providing integral benchmark specifications for methods and data validation for nearly two decades. Data provided by those two projects will be of use to the international reactor physics, criticality safety, and nuclear data communities for future decades. An overview of the IRPhEP and a brief update of the ICSBEP are provided in this paper.

  3. Carbon finance and pro-poor co-benefits: The Gold Standard and Climate, Community and Biodiversity Standards

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Rachel

    2011-04-15

    This paper assesses the practical contribution of the Gold Standard (GS) and Climate Community and Biodiversity (CCB) Standards to local development through the identification of high quality carbon offset projects and ensuring high standards of consultation with local communities during project development and implementation. It is based on desk research, involving analysis of the GS and CCB Standards' project databases, project design documents, and secondary literature. In addition, over 20 representatives of the two standards systems, project developers, NGO representatives, and researchers were interviewed. The paper concludes that both standard systems successfully reward high quality projects which have a demonstrated commitment to local consultations and sustainable development benefits. Moreover, they serve to give well-meaning project developers frameworks with which to ensure that a wide range of criteria are considered in planning and implementing projects. As voluntary standards, it is unrealistic to expect either the GS or CCB Standards to improve poor-quality or unsustainable projects.

  4. Carbon finance and pro-poor co-benefits: The Gold Standard and Climate, Community and Biodiversity Standards

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Rachel

    2011-04-15

    This paper assesses the practical contribution of the Gold Standard (GS) and Climate Community and Biodiversity (CCB) Standards to local development through the identification of high quality carbon offset projects and ensuring high standards of consultation with local communities during project development and implementation. It is based on desk research, involving analysis of the GS and CCB Standards' project databases, project design documents, and secondary literature. In addition, over 20 representatives of the two standards systems, project developers, NGO representatives, and researchers were interviewed. The paper concludes that both standard systems successfully reward high quality projects which have a demonstrated commitment to local consultations and sustainable development benefits. Moreover, they serve to give well-meaning project developers frameworks with which to ensure that a wide range of criteria are considered in planning and implementing projects. As voluntary standards, it is unrealistic to expect either the GS or CCB Standards to improve poor-quality or unsustainable projects.

  5. Overview and Evaluation of the NESC Projects for Fracture Assessments of Nuclear Components

    International Nuclear Information System (INIS)

    Sattari-Far, Iradj; Lorentzon, Mikael

    2011-02-01

    The overall objective of the NESC network has been to examine the reliability of the entire process of structural integrity assessment within an international framework. Within this network, six projects were conducted under the period of 1993-2008. The main targets of these projects were: NESC-I: This project evaluated the interactions among various technical disciplines applied to the integrity assessment of a large-scale thermally shocked spinning cylinder experiment. The cylinder test was designed to simulate selected conditions associated with an ageing flawed reactor pressure vessel. NESC-II: This project was on brittle crack initiation, propagation and arrest of shallow cracks in clad vessels under PTS loading. The results of this project underlined the conservatism of existing defects assessment procedures for shallow RPV flaws. NESC-III: This project was to quantify the accuracy of structural integrity assessment procedures for defects in dissimilar welds. The project was built around the conducted ADIMEW-project to share its overall objectives and to provide additional input. NESC-IV: This project was an experimental/analytical program to develop validated analysis methods for transferring fracture toughness data generated on standard test specimens to shallow flaws in reactor pressure vessel welds subject to biaxial loading in the lower-transition temperature region. NESC-V: This project aimed to develop a European multi-level procedure for handling of thermal fatigue phenomena in the nuclear power plant components. It also aimed to create a database of service and mock-up data for better understanding of thermal fatigue damage mechanisms. NESC-VI: This project was an extension of the NESC-IV project. Embedded subclad racks in beam specimens under uniaxial loading were studied to study the transferability of fracture toughness data between different crack configurations. This report gives an overview report of these six NESC projects. The reports cover

  6. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  7. National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Schiller Consulting, Inc.; Schiller, Steven R.; Goldman, Charles A.; Galawish, Elsia

    2011-02-04

    This report is a scoping study that identifies issues associated with developing a national evaluation, measurement and verification (EM&V) standard for end-use, non-transportation, energy efficiency activities. The objectives of this study are to identify the scope of such a standard and define EM&V requirements and issues that will need to be addressed in a standard. To explore these issues, we provide and discuss: (1) a set of definitions applicable to an EM&V standard; (2) a literature review of existing guidelines, standards, and 'initiatives' relating to EM&V standards as well as a review of 'bottom-up' versus 'top-down' evaluation approaches; (3) a summary of EM&V related provisions of two recent federal legislative proposals (Congressman Waxman's and Markey's American Clean Energy and Security Act of 2009 and Senator Bingaman's American Clean Energy Leadership Act of 2009) that include national efficiency resource requirements; (4) an annotated list of issues that that are likely to be central to, and need to be considered when, developing a national EM&V standard; and (5) a discussion of the implications of such issues. There are three primary reasons for developing a national efficiency EM&V standard. First, some policy makers, regulators and practitioners believe that a national standard would streamline EM&V implementation, reduce costs and complexity, and improve comparability of results across jurisdictions; although there are benefits associated with each jurisdiction setting its own EM&V requirements based on their specific portfolio and evaluation budgets and objectives. Secondly, if energy efficiency is determined by the US Environmental Protection Agency to be a Best Available Control Technology (BACT) for avoiding criteria pollutant and/or greenhouse gas emissions, then a standard can be required for documenting the emission reductions resulting from efficiency actions. The third reason for a national

  8. Growth and Expansion of the International Criticality Safety Benchmark Evaluation Project and the Newly Organized International Reactor Physics Experiment Evaluation Project

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Yolanda Rugama; Enrico Satori

    2007-05-01

    Since ICNC 2003, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) has continued to expand its efforts and broaden its scope. Criticality-alarm / shielding type benchmarks and fundamental physics measurements that are relevant to criticality safety applications are not only included in the scope of the project, but benchmark data are also included in the latest version of the handbook. A considerable number of improvements have been made to the searchable database, DICE and the criticality-alarm / shielding benchmarks and fundamental physics measurements have been included in the database. There were 12 countries participating on the ICSBEP in 2003. That number has increased to 18 with recent contributions of data and/or resources from Brazil, Czech Republic, Poland, India, Canada, and China. South Africa, Germany, Argentina, and Australia have been invited to participate. Since ICNC 2003, the contents of the “International Handbook of Evaluated Criticality Safety Benchmark Experiments” have increased from 350 evaluations (28,000 pages) containing benchmark specifications for 3070 critical or subcritical configurations to 442 evaluations (over 38,000 pages) containing benchmark specifications for 3957 critical or subcritical configurations, 23 criticality-alarm-placement / shielding configurations with multiple dose points for each, and 20 configurations that have been categorized as fundamental physics measurements that are relevant to criticality safety applications in the 2006 Edition of the ICSBEP Handbook. Approximately 30 new evaluations and 250 additional configurations are expected to be added to the 2007 Edition of the Handbook. Since ICNC 2003, a reactor physics counterpart to the ICSBEP, The International Reactor Physics Experiment Evaluation Project (IRPhEP) was initiated. Beginning in 1999, the IRPhEP was conducted as a pilot activity by the by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy

  9. Portland Public Schools Project Chrysalis: Year 2 Evaluation Report.

    Science.gov (United States)

    Mitchell, Stephanie J.; Gabriel, Roy M.; Hahn, Karen J.; Laws, Katherine E.

    In 1994, the Chrysalis Project in Portland Public Schools received funding to prevent or delay the onset of substance abuse among a special target population: high-risk, female adolescents with a history of childhood abuse. Findings from the evaluation of the project's second year of providing assistance to these students are reported here. During…

  10. Real Option--A New Approach in the Evaluation of Telecom Investment Projects

    Institute of Scientific and Technical Information of China (English)

    WU Hong

    2005-01-01

    This paper gives a new method into the evaluating system of telecom investment projects, I.e. Real Option. This may overcome the defects resulted from employing Net Present Value (NPV), which is now used in the evaluation of telecom projects. A theoretical analysis of Real Option is provided, followed by an example of telecom investment project to illustrate the differences between the two methods.

  11. Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Energy Technology Data Exchange (ETDEWEB)

    Kurnik, Charles W. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Carlson, Stephen [DNV GL, Madison, WI (United States)

    2017-10-04

    This Commercial and Industrial Lighting Controls Evaluation Protocol (the protocol) describes methods to account for energy savings resulting from programmatic installation of lighting control equipment in large populations of commercial, industrial, government, institutional, and other nonresidential facilities. This protocol does not address savings resulting from changes in codes and standards, or from education and training activities. When lighting controls are installed in conjunction with a lighting retrofit project, the lighting control savings must be calculated parametrically with the lighting retrofit project so savings are not double counted.

  12. Use of Open Standards and Technologies at the Lunar Mapping and Modeling Project

    Science.gov (United States)

    Law, E.; Malhotra, S.; Bui, B.; Chang, G.; Goodale, C. E.; Ramirez, P.; Kim, R. M.; Sadaqathulla, S.; Rodriguez, L.

    2011-12-01

    The Lunar Mapping and Modeling Project (LMMP), led by the Marshall Space Flight center (MSFC), is tasked by NASA. The project is responsible for the development of an information system to support lunar exploration activities. It provides lunar explorers a set of tools and lunar map and model products that are predominantly derived from present lunar missions (e.g., the Lunar Reconnaissance Orbiter (LRO)) and from historical missions (e.g., Apollo). At Jet Propulsion Laboratory (JPL), we have built the LMMP interoperable geospatial information system's underlying infrastructure and a single point of entry - the LMMP Portal by employing a number of open standards and technologies. The Portal exposes a set of services to users to allow search, visualization, subset, and download of lunar data managed by the system. Users also have access to a set of tools that visualize, analyze and annotate the data. The infrastructure and Portal are based on web service oriented architecture. We designed the system to support solar system bodies in general including asteroids, earth and planets. We employed a combination of custom software, commercial and open-source components, off-the-shelf hardware and pay-by-use cloud computing services. The use of open standards and web service interfaces facilitate platform and application independent access to the services and data, offering for instances, iPad and Android mobile applications and large screen multi-touch with 3-D terrain viewing functions, for a rich browsing and analysis experience from a variety of platforms. The web services made use of open standards including: Representational State Transfer (REST); and Open Geospatial Consortium (OGC)'s Web Map Service (WMS), Web Coverage Service (WCS), Web Feature Service (WFS). Its data management services have been built on top of a set of open technologies including: Object Oriented Data Technology (OODT) - open source data catalog, archive, file management, data grid framework

  13. Standardized evaluation of tumor-infiltrating lymphocytes in breast cancer: results of the ring studies of the international immuno-oncology biomarker working group.

    Science.gov (United States)

    Denkert, Carsten; Wienert, Stephan; Poterie, Audrey; Loibl, Sibylle; Budczies, Jan; Badve, Sunil; Bago-Horvath, Zsuzsanna; Bane, Anita; Bedri, Shahinaz; Brock, Jane; Chmielik, Ewa; Christgen, Matthias; Colpaert, Cecile; Demaria, Sandra; Van den Eynden, Gert; Floris, Giuseppe; Fox, Stephen B; Gao, Dongxia; Ingold Heppner, Barbara; Kim, S Rim; Kos, Zuzana; Kreipe, Hans H; Lakhani, Sunil R; Penault-Llorca, Frederique; Pruneri, Giancarlo; Radosevic-Robin, Nina; Rimm, David L; Schnitt, Stuart J; Sinn, Bruno V; Sinn, Peter; Sirtaine, Nicolas; O'Toole, Sandra A; Viale, Giuseppe; Van de Vijver, Koen; de Wind, Roland; von Minckwitz, Gunter; Klauschen, Frederick; Untch, Michael; Fasching, Peter A; Reimer, Toralf; Willard-Gallo, Karen; Michiels, Stefan; Loi, Sherene; Salgado, Roberto

    2016-10-01

    Multiple independent studies have shown that tumor-infiltrating lymphocytes (TIL) are prognostic in breast cancer with potential relevance for response to immune-checkpoint inhibitor therapy. Although many groups are currently evaluating TIL, there is no standardized system for diagnostic applications. This study reports the results of two ring studies investigating TIL conducted by the International Working Group on Immuno-oncology Biomarkers. The study aim was to determine the intraclass correlation coefficient (ICC) for evaluation of TIL by different pathologists. A total of 120 slides were evaluated by a large group of pathologists with a web-based system in ring study 1 and a more advanced software-system in ring study 2 that included an integrated feedback with standardized reference images. The predefined aim for successful ring studies 1 and 2 was an ICC above 0.7 (lower limit of 95% confidence interval (CI)). In ring study 1 the prespecified endpoint was not reached (ICC: 0.70; 95% CI: 0.62-0.78). On the basis of an analysis of sources of variation, we developed a more advanced digital image evaluation system for ring study 2, which improved the ICC to 0.89 (95% CI: 0.85-0.92). The Fleiss' kappa value for international standardization project shows that reproducible evaluation of TIL is feasible in breast cancer. This opens the way for standardized reporting of tumor immunological parameters in clinical studies and diagnostic practice. The software-guided image evaluation approach used in ring study 2 may be of value as a tool for evaluation of TIL in clinical trials and diagnostic practice. The experience gained from this approach might be applicable to the standardization of other diagnostic parameters in histopathology.

  14. Internationally Standardized Cost Item Definitions for Decommissioning of Nuclear Installations

    International Nuclear Information System (INIS)

    Lucien Teunckens; Kurt Pflugrad; Candace Chan-Sands; Ted Lazo

    2000-01-01

    The European Commission (EC), the International Atomic Energy Agency (IAEA), and the Organization for Economic Cooperation and Development/Nuclear Energy Agency (OECD/NEA) have agreed to jointly prepare and publish a standardized list of cost items and related definitions for decommissioning projects. Such a standardized list would facilitate communication, promote uniformity, and avoid inconsistency or contradiction of results or conclusions of cost evaluations for decommissioning projects carried out for specific purposes by different groups. Additionally, a standardized structure would also be a useful tool for more effective cost management. This paper describes actual work and result thus far

  15. Evaluation of double drop beads pavement edge lines : SPR project description.

    Science.gov (United States)

    2009-01-01

    In UTCA projects 01465 and 04405, the retroreflectivities and the life cycle costs were measured and compared for standard Alabama Department of Transportation (ALDOT) thermoplastic edge : stripes that contained only one size of retroreflective beads...

  16. [Evaluation of 12 pilot projects to improve outpatient palliative care].

    Science.gov (United States)

    Schmidt-Wolf, G; Elsner, F; Lindena, G; Hilgers, R-D; Heussen, N; Rolke, R; Ostgathe, C; Radbruch, L

    2013-12-01

    With a priority programme the German Cancer Aid supported the development of quality-assured outpatient palliative care to cover the whole country. The 12 regional pilot projects funded with the aim to improve outpatient palliative care in different models and different frameworks were concurrently monitored and evaluated. The supported projects, starting and ending individually, documented all patients who were cared for using HOPE (Hospice and palliative care evaluation) and MIDOS (Minimal documentation system for palliative patients). Total data were analyzed for 3239 patients decriptively. In addition to the quantitative data the experiences of the projects were recorded in a number of workshops (2008, 2009, 2010, and 2012). In particular, the experiences reported in the final meeting in July 2012 were considered for this article as well as the final reports for the German Cancer Aid. In the quantitative evaluation 85.6% of 3239 palliative care patients had a cancer diagnosis. In all model projects the goal of a network with close cooperation of primary providers, social support, and outpatient and inpatient specialist services has been achieved. For all projects, the initial financing of the German Cancer Aid was extremely important, because contracts with health insurance funds were negotiated slowly, and could then be built on the experiences with the projects. The participants of the project-completion meeting emphasized the need to carry out a market analysis before starting palliative care organizations considering the different regional structures and target groups of patients. Education, training and continuing education programs contribute significantly to the network. A reliably funded coordination center/case management across all institutions is extremely important. © Georg Thieme Verlag KG Stuttgart · New York.

  17. Federal Workplace Literacy Project. Internal Evaluation Report.

    Science.gov (United States)

    Matuszak, David J.

    This report describes the following components of the Nestle Workplace Literacy Project: six job task analyses, curricula for six workplace basic skills training programs, delivery of courses using these curricula, and evaluation of the process. These six job categories were targeted for training: forklift loader/checker, BB's processing systems…

  18. Standard guidelines for the chromosome-centric human proteome project.

    Science.gov (United States)

    Paik, Young-Ki; Omenn, Gilbert S; Uhlen, Mathias; Hanash, Samir; Marko-Varga, György; Aebersold, Ruedi; Bairoch, Amos; Yamamoto, Tadashi; Legrain, Pierre; Lee, Hyoung-Joo; Na, Keun; Jeong, Seul-Ki; He, Fuchu; Binz, Pierre-Alain; Nishimura, Toshihide; Keown, Paul; Baker, Mark S; Yoo, Jong Shin; Garin, Jerome; Archakov, Alexander; Bergeron, John; Salekdeh, Ghasem Hosseini; Hancock, William S

    2012-04-06

    The objective of the international Chromosome-Centric Human Proteome Project (C-HPP) is to map and annotate all proteins encoded by the genes on each human chromosome. The C-HPP consortium was established to organize a collaborative network among the research teams responsible for protein mapping of individual chromosomes and to identify compelling biological and genetic mechanisms influencing colocated genes and their protein products. The C-HPP aims to foster the development of proteome analysis and integration of the findings from related molecular -omics technology platforms through collaborations among universities, industries, and private research groups. The C-HPP consortium leadership has elicited broad input for standard guidelines to manage these international efforts more efficiently by mobilizing existing resources and collaborative networks. The C-HPP guidelines set out the collaborative consensus of the C-HPP teams, introduce topics associated with experimental approaches, data production, quality control, treatment, and transparency of data, governance of the consortium, and collaborative benefits. A companion approach for the Biology and Disease-Driven HPP (B/D-HPP) component of the Human Proteome Project is currently being organized, building upon the Human Proteome Organization's organ-based and biofluid-based initiatives (www.hupo.org/research). The common application of these guidelines in the participating laboratories is expected to facilitate the goal of a comprehensive analysis of the human proteome.

  19. Teacher Perceptions of Their Curricular and Pedagogical Shifts: Outcomes of a Project-Based Model of Teacher Professional Development in the Next Generation Science Standards

    OpenAIRE

    David J. Shernoff; David J. Shernoff; Suparna Sinha; Denise M. Bressler; Dawna Schultz

    2017-01-01

    In this study, we conducted a model of teacher professional development (PD) on the alignment of middle and high school curricula and instruction to the Next Generation Science Standards (NGSSs), and evaluated the impact of the PD on teacher participants’ development. The PD model included a 4-day summer academy emphasizing project-based learning (PBL) in the designing of NGSS-aligned curricula and instruction, as well as monthly follow-up Professional Learning Community meetings throughout t...

  20. Evaluation system of Research and Development projects and services from ININ; Sistema de Evaluacion de Proyectos de Investigacion y Desarrollo y Servicios del ININ

    Energy Technology Data Exchange (ETDEWEB)

    Reglero, R [Instituto Nacional de Investigaciones Nucleares, Mexico City (Mexico)

    1994-12-31

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author).

  1. The Heartfile Lodhran CVD prevention project--end of project evaluation.

    Science.gov (United States)

    Nishtar, Sania; Badar, Asma; Kamal, Mohammad Umer; Iqbal, Azhar; Bajwa, Rashid; Shah, Tauqeer; Larik, Zahid; Karim, Fazle; Mehmood, Mahmood ul Hassan; Jehangir, Haroon; Azam, Syed Iqbal; Mirza, Yasir Abbas; Khan, Shahzad Ali; Qayyum, Aamra; Aqeel, Fauzia; Bakir, Abdul; Rahim, Ejaz

    2007-01-01

    Mainstream preventive interventions often fail to reach poor populations with a high risk of cardiovascular diseases (CVDs) in Pakistan. A community-based CVD primary prevention project aimed at developing approaches to reduce risk factors in such populations was established by Heartfile in collaboration with the National Rural Support Program in the district of Lodhran. The project implemented a range of activities integrated with existing social and health service mechanisms during a three year intervention period 2000/01-03/04. These were targeted in 4 key settings: community health education, mass media interventions, training of health professionals and health education through Lady Health Workers. The project received support from the Department for International Development, U.K. At the community level, a pre-test-post-test quasi-experimental design was used for examining project outcomes related to the community component of the intervention. Pre and post-intervention (training) evaluations were conducted involving all health care providers in randomly selected workshops in order to determine baseline levels of knowledge and the impact of training on knowledge level. In order to assess practices of physician and non-physician health care providers patient interviews, with control comparisons were conducted at each health care facility. Significant positive changes were observed in knowledge levels at a community level in the district of intervention compared with baseline knowledge levels particularly in relation to a heart healthy diet, beneficial level of physical activity, the causes of high blood pressure and heart attack and the effects of high blood pressure and active and passive smoking on health. Significant changes in behaviors at a practice level were not shown in the district of intervention. However the project played a critical role in spurring national action for the prevention and control of non-communicable diseases and introducing

  2. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  3. Decay data evaluation project: Evaluation of 52Mn and 52mMn nuclear decay data

    Science.gov (United States)

    Luca, Aurelian

    2017-09-01

    All nuclear decay data within the 52Fe-52m,52Mn-52Cr decay chain have been evaluated at IFIN-HH, Romania, as part of an IAEA coordinated research project (F41029) and incorporated into the Decay Data Evaluation Project (DDEP). Both 52Fe and daughter 52Mn are two potentially promising radionuclides to be incorporated into suitable radiopharmaceuticals for PET and SPECT imaging. The decay data evaluation of 52Fe has previously been published and reported to the IAEA Nuclear Data Section. Equivalent DDEP evaluations for 52Mn and 52mMn have also been completed recently, and are presented in summary form below. These improved decay data sets have also been reported to the IAEA in detail, and are highly suitable in dose rate calculations for their application in nuclear medicine.

  4. An investigation on comprehensive evaluation and standard of image quality of high voltage chest radiograph

    International Nuclear Information System (INIS)

    Yan Shulin; Li Shuopeng; Zhao Bo; Niu Yantao

    1998-01-01

    Purpose: Based on clinical diagnostic demand, patient irradiation dose and imaging technical parameters, to establish a comprehensive evaluation method and standard in chest radiograph. Methods: (1) From 10 normal chest radiographs, the authors selected the evaluation area on thoracic PA (posteroanterior) radiographs and set up standard for diagnostic demand; (2) Using chest CT scans of 20 males and 20 females, the authors calculated the ratio of lung field to mediastinum; (3) Selecting 100 chest films using 125 kVp, the authors measured the standard density values of each evaluation area; (4) Body surface irradiation doses of 478 normal adults were measured. Results: (1) Based on diagnostic demand, the authors confirmed 7 evaluation areas and 4 physical evaluation factors. At the same time, evaluation standards were obtained; (2) Comprehensive evaluation methods were established; (3) Standard height, weight and body surface irradiation dose of Chinese normal adults were investigated preliminarily. Conclusion: Based on the concept of comprehensive evaluation, investigation on the evaluation methods and standard in chest PA radiograph was carried out which might be taken as the foundation for future approach on nation-wide basis

  5. Evaluation of the Relational Competence Project 2012-16

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    2017-01-01

    The relational competence project was initiated by a broad group of stakeholders, referring to both research and to concrete experiences of a need for development in schools and teacher education. The evaluation of the project has been based on a retrospective survey with answers and reflections......, and the same was new insight into the importance of relations and the concrete tools and approaches tried with students in schools. Some of the challenges emphasised was about the so-called “inner exercises”. It seems that systematic enactments with these exercises was perceived as extremely beneficial...... the project aspects to frame their inquiries for the final bachelor-project. Those students have experienced the highest level of professional outcomes. Relational competence has in their bachelor-inquiries been used in a very wide range of pedagogical and subject matter contexts, emphasizing relational...

  6. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Agol, Dorice, E-mail: d.agol@uea.a.c.uk [University of East Anglia, School of International Development, Norwich NR4 7TJ (United Kingdom); Latawiec, Agnieszka E., E-mail: a.latawiec@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Opole University of Technology, Department of Production Engineering and Logistics, Luboszycka 5, 45-036 Opole (Poland); University of East Anglia, School of Environmental Sciences, Norwich NR4 7TJ (United Kingdom); Strassburg, Bernardo B.N., E-mail: b.strassburg@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Department of Geography and the Environment, Pontificia Universidade Catolica, 22453-900 Rio de Janeiro (Brazil)

    2014-09-15

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  7. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    International Nuclear Information System (INIS)

    Agol, Dorice; Latawiec, Agnieszka E.; Strassburg, Bernardo B.N.

    2014-01-01

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  8. Malaysian NDT standards

    International Nuclear Information System (INIS)

    Khazali Mohd Zin

    2001-01-01

    In order to become a developed country, Malaysia needs to develop her own national standards. It has been projected that by the year 2020, Malaysia requires about 8,000 standards (Department of Standard Malaysia). Currently more than 2,000 Malaysian Standards have been gazette by the government which considerably too low before tire year 2020. NDT standards have been identified by the standard working group as one of the areas to promote our national standards. In this paper the author describes the steps taken to establish the Malaysian very own NDT standards. The project starts with the establishment of radiographic standards. (Author)

  9. Introduction course on the economical evaluation of energy projects

    International Nuclear Information System (INIS)

    Jansen, J.C.

    1992-06-01

    A theoretical course on the financial and economical evaluation of energy projects is presented. The course was organized by the Banque Mondiale in Bujumbura, Burundi, from 11 to 16 November 1991. Subsequently attention is paid to the basics of economic analysis, the financial and the economical analysis of an investment project, and finally the prices of energy products. 4 figs., 13 refs

  10. A Gold Standards Approach to Training Instructors to Evaluate Crew Performance

    Science.gov (United States)

    Baker, David P.; Dismukes, R. Key

    2003-01-01

    The Advanced Qualification Program requires that airlines evaluate crew performance in Line Oriented Simulation. For this evaluation to be meaningful, instructors must observe relevant crew behaviors and evaluate those behaviors consistently and accurately against standards established by the airline. The airline industry has largely settled on an approach in which instructors evaluate crew performance on a series of event sets, using standardized grade sheets on which behaviors specific to event set are listed. Typically, new instructors are given a class in which they learn to use the grade sheets and practice evaluating crew performance observed on videotapes. These classes emphasize reliability, providing detailed instruction and practice in scoring so that all instructors within a given class will give similar scores to similar performance. This approach has value but also has important limitations; (1) ratings within one class of new instructors may differ from those of other classes; (2) ratings may not be driven primarily by the specific behaviors on which the company wanted the crews to be scored; and (3) ratings may not be calibrated to company standards for level of performance skill required. In this paper we provide a method to extend the existing method of training instructors to address these three limitations. We call this method the "gold standards" approach because it uses ratings from the company's most experienced instructors as the basis for training rater accuracy. This approach ties the training to the specific behaviors on which the experienced instructors based their ratings.

  11. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  12. Color back projection for fruit maturity evaluation

    Science.gov (United States)

    Zhang, Dong; Lee, Dah-Jye; Desai, Alok

    2013-12-01

    In general, fruits and vegetables such as tomatoes and dates are harvested before they fully ripen. After harvesting, they continue to ripen and their color changes. Color is a good indicator of fruit maturity. For example, tomatoes change color from dark green to light green and then pink, light red, and dark red. Assessing tomato maturity helps maximize its shelf life. Color is used to determine the length of time the tomatoes can be transported. Medjool dates change color from green to yellow, and the orange, light red and dark red. Assessing date maturity helps determine the length of drying process to help ripen the dates. Color evaluation is an important step in the processing and inventory control of fruits and vegetables that directly affects profitability. This paper presents an efficient color back projection and image processing technique that is designed specifically for real-time maturity evaluation of fruits. This color processing method requires very simple training procedure to obtain the frequencies of colors that appear in each maturity stage. This color statistics is used to back project colors to predefined color indexes. Fruit maturity is then evaluated by analyzing the reprojected color indexes. This method has been implemented and used for commercial production.

  13. Basalt Waste Isolation Project Technical Program Evaluation Process: a criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, G.C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP wll be further formalized and further applied to the review of BWIP technical activities

  14. Success factors for international HTA projects: evaluating EUnetHTA Joint Action as an exemplar.

    Science.gov (United States)

    Guegan, Eleanor Woodford; Cook, Andrew

    2014-11-01

    Evaluation is essential for the management of international projects or networks in health technology assessment (HTA). It extends beyond the normal process of project management by incorporating qualitative dimensions and provides information about a project's effectiveness and achievements. This article aimed to identify the factors that are important for the success of international HTA projects. The European network for Health Technology Assessment Joint Action (EUnetHTA JA) is presented as an exemplar. METHODS for the evaluation of international HTA projects include interviews, focus groups, questionnaires, observations and documentary review, and the key points of these approaches have been summarized. The impact and effectiveness of the EUnetHTA JA was evaluated by questionnaires of project participants and external stakeholders, and by documentary review. The response rate for the three annual questionnaires sent to project participants ranged from 86 percent to 88 percent and for external stakeholders ranged from 65 percent to 88 percent. Key factors for project success included production of deliverables according to the workplan, achievement of objectives, added value generated, effective communication, involvement of external stakeholders, workstream management and progress from the preceding EUnetHTA 2006-2008 project. The experience of this project can inform the evaluation of future international HTA collaborations, such as the EUnetHTA 2nd Joint Action and HTAsiaLink. A high response rate was achieved to the self-completion questionnaires and the strategy followed is recommended for evaluation of international HTA projects. Future assessments of international HTA projects should strive to measure outcomes and impact, not just outputs and process.

  15. Formative evaluation of the telecare fall prevention project for older veterans.

    Science.gov (United States)

    Miake-Lye, Isomi M; Amulis, Angel; Saliba, Debra; Shekelle, Paul G; Volkman, Linda K; Ganz, David A

    2011-05-23

    Fall prevention interventions for community-dwelling older adults have been found to reduce falls in some research studies. However, wider implementation of fall prevention activities in routine care has yielded mixed results. We implemented a theory-driven program to improve care for falls at our Veterans Affairs healthcare facility. The first project arising from this program used a nurse advice telephone line to identify patients' risk factors for falls and to triage patients to appropriate services. Here we report the formative evaluation of this project. To evaluate the intervention we: 1) interviewed patient and employee stakeholders, 2) reviewed participating patients' electronic health record data and 3) abstracted information from meeting minutes. We describe the implementation process, including whether the project was implemented according to plan; identify barriers and facilitators to implementation; and assess the incremental benefit to the quality of health care for fall prevention received by patients in the project. We also estimate the cost of developing the pilot project. The project underwent multiple changes over its life span, including the addition of an option to mail patients educational materials about falls. During the project's lifespan, 113 patients were considered for inclusion and 35 participated. Patient and employee interviews suggested support for the project, but revealed that transportation to medical care was a major barrier in following up on fall risks identified by nurse telephone triage. Medical record review showed that the project enhanced usual medical care with respect to home safety counseling. We discontinued the program after 18 months due to staffing limitations and competing priorities. We estimated a cost of $9194 for meeting time to develop the project. The project appeared feasible at its outset but could not be sustained past the first cycle of evaluation due to insufficient resources and a waning of local

  16. Formative evaluation of the telecare fall prevention project for older veterans

    Directory of Open Access Journals (Sweden)

    Saliba Debra

    2011-05-01

    Full Text Available Abstract Background Fall prevention interventions for community-dwelling older adults have been found to reduce falls in some research studies. However, wider implementation of fall prevention activities in routine care has yielded mixed results. We implemented a theory-driven program to improve care for falls at our Veterans Affairs healthcare facility. The first project arising from this program used a nurse advice telephone line to identify patients' risk factors for falls and to triage patients to appropriate services. Here we report the formative evaluation of this project. Methods To evaluate the intervention we: 1 interviewed patient and employee stakeholders, 2 reviewed participating patients' electronic health record data and 3 abstracted information from meeting minutes. We describe the implementation process, including whether the project was implemented according to plan; identify barriers and facilitators to implementation; and assess the incremental benefit to the quality of health care for fall prevention received by patients in the project. We also estimate the cost of developing the pilot project. Results The project underwent multiple changes over its life span, including the addition of an option to mail patients educational materials about falls. During the project's lifespan, 113 patients were considered for inclusion and 35 participated. Patient and employee interviews suggested support for the project, but revealed that transportation to medical care was a major barrier in following up on fall risks identified by nurse telephone triage. Medical record review showed that the project enhanced usual medical care with respect to home safety counseling. We discontinued the program after 18 months due to staffing limitations and competing priorities. We estimated a cost of $9194 for meeting time to develop the project. Conclusions The project appeared feasible at its outset but could not be sustained past the first cycle of

  17. Building a partnership to evaluate school-linked health services: the Cincinnati School Health Demonstration Project.

    Science.gov (United States)

    Rose, Barbara L; Mansour, Mona; Kohake, Kelli

    2005-12-01

    The Cincinnati School Health Demonstration Project was a 3-year collaboration that evaluated school-linked health services in 6 urban elementary (kindergarten to eighth grade) schools. Partners from the Cincinnati Health Department, Cincinnati Public Schools, Cincinnati Children's Hospital Medical Center, and The Health Foundation of Greater Cincinnati wanted to determine if levels of school-linked care made a difference in student quality of life, school connectedness, attendance, emergency department use, and volume of referrals to health care specialists. School nurses, principals and school staff, parents and students, upper-level managers, and health service researchers worked together over a 2.5-year period to learn about and use new technology to collect information on student health, well-being, and outcome measures. Varying levels of school health care intervention models were instituted and evaluated. A standard model of care was compared with 2 models of enhanced care and service. The information collected from students, parents, nurses, and the school system provided a rich database on the health of urban children. School facilities, staffing, and computer technology, relationship building among stakeholders, extensive communication, and high student mobility were factors that influenced success and findings of the project. Funding for district-wide computerization and addition of school health staff was not secured by the end of the demonstration project; however, relationships among the partners endured and paved the way for future collaborations designed to better serve urban school children in Cincinnati.

  18. An Analysis of Internally Funded Learning and Teaching Project Evaluation in Higher Education

    Science.gov (United States)

    Huber, Elaine; Harvey, Marina

    2016-01-01

    Purpose: In the higher education sector, the evaluation of learning and teaching projects is assuming a role as a quality and accountability indicator. The purpose of this paper is to investigate how learning and teaching project evaluation is approached and critiques alignment between evaluation theory and practice. Design/Methodology/Approach:…

  19. Evaluation of four building energy analysis computer programs against ASHRAE standard 140-2007

    CSIR Research Space (South Africa)

    Szewczuk, S

    2014-08-01

    Full Text Available ) standard or code of practice. Agrément requested the CSIR to evaluate a range of building energy simulation computer programs. The standard against which these computer programs were to be evaluated was developed by the American Society of Heating...

  20. Research on Comprehensive Evaluation Method for Heating Project Based on Analytic Hierarchy Processing

    Science.gov (United States)

    Han, Shenchao; Yang, Yanchun; Liu, Yude; Zhang, Peng; Li, Siwei

    2018-01-01

    It is effective to reduce haze in winter by changing the distributed heat supply system. Thus, the studies on comprehensive index system and scientific evaluation method of distributed heat supply project are essential. Firstly, research the influence factors of heating modes, and an index system with multiple dimension including economic, environmental, risk and flexibility was built and all indexes were quantified. Secondly, a comprehensive evaluation method based on AHP was put forward to analyze the proposed multiple and comprehensive index system. Lastly, the case study suggested that supplying heat with electricity has great advantage and promotional value. The comprehensive index system of distributed heating supply project and evaluation method in this paper can evaluate distributed heat supply project effectively and provide scientific support for choosing the distributed heating project.

  1. Formative Evaluation of a Nutritional Marketing Project in City-Center Restaurants.

    Science.gov (United States)

    Demers, Andree; Renaud, Lise

    1992-01-01

    Formative evaluation of a community health project providing and promoting low-fat foods in five restaurants in Montreal (Canada) shows that restaurateurs are willing to collaborate in project implementation but not in training waiters and that the project did not cause an increase in market demand for low-fat menu offerings. (SLD)

  2. Extensive Evaluation of Using a Game Project in a Software Architecture Course

    Science.gov (United States)

    Wang, Alf Inge

    2011-01-01

    This article describes an extensive evaluation of introducing a game project to a software architecture course. In this project, university students have to construct and design a type of software architecture, evaluate the architecture, implement an application based on the architecture, and test this implementation. In previous years, the domain…

  3. Performance Evaluation of Public-Private Partnership Projects from the Perspective of Efficiency, Economic, Effectiveness, and Equity: A Study of Residential Renovation Projects in China

    Directory of Open Access Journals (Sweden)

    Xuhui Cong

    2018-06-01

    Full Text Available The performance evaluation index system was established on the basis of 4E (Efficiency, Economic, Effectiveness, Equity theory to improve performance evaluation of Public-Private Partnership Projects for Residential Renovation (4P2R. Moreover, the index weighting model was demonstrated based on Ordered Weighted Averaging (OWA. Finally, the cloud model was used for performance evaluation, through the cloud uncertainty reasoning to determine the quantitative performance evaluation index value, the positive reverse cloud to calculate the qualitative performance evaluation index value, and the normal cloud to measure the project performance. The proof-of-concept application shows that the performance evaluation index system and evaluation model can better identify the deficiencies in the project, and provide targeted improvement measures for similar projects in the future.

  4. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    Science.gov (United States)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  5. Data standards for the international virtual observatory

    Directory of Open Access Journals (Sweden)

    R J Hanisch

    2006-11-01

    Full Text Available A primary goal of the International Virtual Observatory Alliance, which brings together Virtual Observatory Projects from 16 national and international development projects, is to develop, evaluate, test, and agree upon standards for astronomical data formatting, data discovery, and data delivery. In the three years that the IVOA has been in existence, substantial progress has been made on standards for tabular data, imaging data, spectroscopic data, and large-scale databases and on managing the metadata that describe data collections and data access services. In this paper, I describe how the IVOA operates and give my views as to why such a broadly based international collaboration has been able to make such rapid progress.

  6. pep-up: a review of the umgeni valley pro.ject evaluation process

    African Journals Online (AJOL)

    The evaluation process at the Umgeni Valle~ Project is.described. Its evolution, background and ... mental Education circles in Southern Africa. The ... t? the percei~ed need for evaluation of the Umgen1 Valley ProJect. ... This group, insisting that they were facilitating .... Phase : An integrated summary of all fielc and working ...

  7. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  8. NASA's Software Safety Standard

    Science.gov (United States)

    Ramsay, Christopher M.

    2007-01-01

    NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those

  9. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  10. Semi-automatic construction of reference standards for evaluation of image registration

    NARCIS (Netherlands)

    Murphy, K.; Ginneken, van B.; Klein, S.; Staring, M.; Hoop, de B.J.; Viergever, M.A.; Pluim, J.P.W.

    2011-01-01

    Quantitative evaluation of image registration algorithms is a difficult and under-addressed issue due to the lack of a reference standard in most registration problems. In this work a method is presented whereby detailed reference standard data may be constructed in an efficient semi-automatic

  11. Evaluating the US government's crude oil price projections

    International Nuclear Information System (INIS)

    Williams, M.D.

    1992-01-01

    The U.S. Department of Energy's (DOE) 1991 official long run crude oil price projections are evaluated by comparing parameter averages for the forecast period (1991-2010) to parameter averages from crude oil price history (1859-1990). The parameters used in the evaluation are average price, average annual price changes, and average cycle duration (in years). All prices used in the analysis are annual prices in constant 1990 dollars per barrel. 13 figs

  12. Using Evaluability Assessment to Improve Program Evaluation for the Blue-Throated Macaw Environmental Education Project in Bolivia

    Science.gov (United States)

    Salvatierra da Silva, Daniela; Jacobson, Susan K.; Monroe, Martha C.; Israel, Glenn D.

    2016-01-01

    An evaluability assessment of a program to save a critically endangered bird helped prepare the Blue-throated Macaw Environmental Education Project for evaluation and program improvement. The evaluability assessment facilitated agreement among key stakeholders on evaluation criteria and intended uses of evaluation information in order to maximize…

  13. Process evaluation of a community-based adolescent obesity prevention project in Tonga.

    Science.gov (United States)

    Fotu, Kalesita F; Moodie, Marj M; Mavoa, Helen M; Pomana, Siosifa; Schultz, Jimaima T; Swinburn, Boyd A

    2011-05-09

    The rising burden of obesity in Tonga is alarming. The promotion of healthy behaviours and environments requires immediate urgent action and a multi-sectoral approach. A three-year community based study titled the Ma'alahi Youth Project (MYP) conducted in Tonga from 2005-2008 aimed to increase the capacity of the whole community (schools, churches, parents and adolescents) to promote healthy eating and regular physical activity and to reduce the prevalence of overweight and obesity amongst youth and their families. This paper reflects on the process evaluation for MYP, against a set of Best Practice Principles for community-based obesity prevention. MYP was managed by the Fiji School of Medicine. A team of five staff in Tonga were committed to planning, implementation and evaluation of a strategic plan, the key planks of which were developed during a two day community workshop. Intervention activities were delivered in villages, churches and schools, on the main island of Tongatapu. Process evaluation data covering the resource utilisation associated with all intervention activities were collected, and analysed by dose, frequency and reach for specific strategies. The action plan included three standard objectives around capacity building, social marketing and evaluation; four nutrition; two physical activity objectives; and one around championing key people as role models. While the interventions included a wide mix of activities straddling across all of these objectives and in both school and village settings, there was a major focus on the social marketing and physical activity objectives. The intervention reach, frequency and dose varied widely across all activities, and showed no consistent patterns. The adolescent obesity interventions implemented as part of the MYP program comprised a wide range of activities conducted in multiple settings, touched a broad spectrum of the population (wider than the target group), but the dose and frequency of activities were

  14. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  15. Sustainability Evaluation of Power Grid Construction Projects Using Improved TOPSIS and Least Square Support Vector Machine with Modified Fly Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available The electric power industry is of great significance in promoting social and economic development and improving people’s living standards. Power grid construction is a necessary part of infrastructure construction, whose sustainability plays an important role in economic development, environmental protection and social progress. In order to effectively evaluate the sustainability of power grid construction projects, in this paper, we first identified 17 criteria from four dimensions including economy, technology, society and environment to establish the evaluation criteria system. After that, the grey incidence analysis was used to modify the traditional Technique for Order Preference by Similarity to an Ideal Solution (TOPSIS, which made it possible to evaluate the sustainability of electric power construction projects based on visual angle of similarity and nearness. Then, in order to simplify the procedure of experts scoring and computation, on the basis of evaluation results of the improved TOPSIS, the model using Modified Fly Optimization Algorithm (MFOA to optimize the Least Square Support Vector Machine (LSSVM was established. Finally, a numerical example was given to demonstrate the effectiveness of the proposed model.

  16. TRIM timber projections: an evaluation based on forest inventory measurements.

    Science.gov (United States)

    John R. Mills

    1989-01-01

    Two consecutive timberland inventories collected from permanent plots in the natural pine type in North Carolina were used to evaluate the timber resource inventory model (TRIM). This study compares model predictions with field measurements and examines the effect of inventory data aggregation on the accuracy of projections. Projections were repeated for two geographic...

  17. Safety standards for express roads : research in the framework of the European research project Safety Standards for Road Design and Redesign SAFESTAR, Workpackages 3.4.

    NARCIS (Netherlands)

    Hummel, T.

    1999-01-01

    The objective of the SAFESTAR project is the formulation of design standards or recommendations exclusively based on safety arguments. Workpackage 3 (WP3) of SAFESTAR, of which this report is the concluding report, should result in design recommendations for single and dual-carriageway express roads

  18. Evaluation of Nuclear Facility Decommissioning Projects program

    International Nuclear Information System (INIS)

    Baumann, B.L.

    1983-01-01

    The objective of the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program is to provide the NRC licensing staff with data which will allow an assessment of radiation exposure during decommissioning and the implementation of ALARA techniques. The data will also provide information to determine the funding level necessary to ensure timely and safe decommissioning operations. Actual decommissioning costs, methods and radiation exposures are compared with those estimated by the Battelle-PNL and ORNL NUREGs on decommissioning. Exposure reduction techniques applied to decommissioning activities to meet ALARA objectives are described. The lessons learned concerning various decommissioning methods are evaluated

  19. Standard practice for production and evaluation of field metallographic replicas

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2001-01-01

    1.1 This practice covers recognized methods for the preparation and evaluation of cellulose acetate or plastic film replicas which have been obtained from metallographically prepared surfaces. It is designed for the evaluation of replicas to ensure that all significant features of a metallographically prepared surface have been duplicated and preserved on the replica with sufficient detail to permit both LM and SEM examination with optimum resolution and sensitivity. 1.2 This practice may be used as a controlling document in commercial situations. 1.3 The values stated in SI units are to be regarded as the standard. Inch-pound units given in parentheses are for information only. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

  20. The Coding Causes of Death in HIV (CoDe) Project: initial results and evaluation of methodology

    DEFF Research Database (Denmark)

    Kowalska, Justyna D; Friis-Møller, Nina; Kirk, Ole

    2011-01-01

    The Coding Causes of Death in HIV (CoDe) Project aims to deliver a standardized method for coding the underlying cause of death in HIV-positive persons, suitable for clinical trials and epidemiologic studies.......The Coding Causes of Death in HIV (CoDe) Project aims to deliver a standardized method for coding the underlying cause of death in HIV-positive persons, suitable for clinical trials and epidemiologic studies....

  1. Fuzzy logic approach for energetic and economic evaluation of hydroelectric projects

    International Nuclear Information System (INIS)

    Iliev, Atanas M.

    2003-01-01

    A mathematical model for energetic and economic evaluation of hydroelectric projects is developed. The main advantage of the proposed methodology is that the model considers uncertainty and vagueness which appears during the decision making process. Due to modeling of variables that are non statistical in their character, fuzzy logic approach is fully incorporated in the model. The first step in energetic evaluation of the hydro power projects is determination of the characteristic of the efficiency of the units to be installed in hydro power plants. For this purpose the model which uses the best characteristics of Artificial Network Fuzzy Inference System (ANFIS) is applied. The method is tested on real systems: HPP Tikves- the power plant in operation and HPP Kozjak - the power plant in construction. The results obtained from practical implementation show that the proposed approach gives superior results than classical polynomial approximation. The model for determining the consumption characteristic of hydro power plant is developed by Sugeno Fuzzy Logic System with polynomials in the consequent part of the rules. Model takes into account the variable gross head of HPP, as well as, the number of units which will be in operation for given output. Modeling of the gross head and power output are performed by expert's design membership functions. This model is practically applied on HPP Tikves for determination of the consumption characteristic for several gross head. The plausible yearly production of electricity from hydro power project, which is important for estimation of the benefit from the project, is calculated by mixed fuzzy-statistical model. hi this approach fuzzy set of the inflow is constructed according to the statistical parameters. The calculation of the production of electricity is realized for a several hydrological conditions which are described by linguistic variables. Finally, Mamdani Fuzzy Inference System with fuzzy number in consequent part

  2. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Directory of Open Access Journals (Sweden)

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  3. Realization of economic evaluation expert system for uranium mine project

    International Nuclear Information System (INIS)

    Wang Haifeng

    1993-01-01

    By studying the EVALUATOR, economic evaluation expert system of uranium mine project, the theoretical fundamentals of expert system, principle of inference mechanism, implementation of knowledge base, realization of explanation mechanism, acquisition of domain knowledge and representation of knowledge were described, especially the subjective Bayes approach for inexact reasoning problem used in EVALUATOR was discussed in detail

  4. Integrated evaluation framework. Based on the logical framework approach for project cycle management

    International Nuclear Information System (INIS)

    1996-11-01

    This Integrated Evaluation Framework (IEF) was developed by TC Evaluation with the aim of presenting in a comprehensive manner the logic of thinking used when evaluating projects and programmes. Thus, in the first place, the intended audience for this report are evaluation officers, so that when applying the evaluation procedures and check lists, data can be organized following a systematic and logical scheme and conclusions can be derived ''objectively''. The value of such a framework for reporting on performance and in providing a quality reference for disbursements represents one of its major advantages. However, when developing and applying the IEF, it was realized that a Logical Framework Approach (LFA), like the one upon which the IEF is based, needs to be followed throughout the project life cycle, from the Country Programme Framework planning stage, through project design and implementation. Then, the helpful consequences flow into project design quality and smooth implementation. It is only in such an environment that meaningful and consistent evaluation can take place. Therefore the main audience for this report are Agency staff involved in planning, designing and implementing TC projects as well as their counterparts in Member States. In this understanding, the IEF was subjected to review by a consultants meeting, which included both external consultants and Agency staff. This Consultants Review Meeting encouraged the Secretariat to further adopt the LFA into the TC management process

  5. Standard Terminology for Phenotypic Variations: The Elements of Morphology Project, Its Current Progress, and Future Directions

    NARCIS (Netherlands)

    Carey, John C.; Allanson, Judith E.; Hennekam, Raoul C. M.; Biesecker, Leslie G.

    2012-01-01

    In 2005, the authors of this article formed an international working group to develop standardized definitions and terms to describe the physical variations used in human phenotypic analyses. This project, which came to be known as the Elements of Morphology, resulted in six articles proposing

  6. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    Science.gov (United States)

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  7. Technical evaluation of draft ANSI Standard N13.30, ''performance criteria for radiobioassay''

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1986-03-01

    The Pacific Northwest Laboratory (PNL) is conducting a research program to evaluate the appropriateness of criteria in the ANSI draft Standard N13.30, ''Performance Criteria for Radiobioassay.'' The evaluation has progressed parallel with the preparation of the Standard by evaluating the performance of existing bioassay laboratories against the criteria specified. Recommendations for revision of the Standard and implementation of a testing/accreditation program have been formulated based on study results. The current performance testing program includes both in-vivo counting and in-vitro sample measurements. Test criteria specified in the Standard include relative bias, relative precision, and acceptable minimum detectable activity (AMDA). Results to date have indicated that the acceptance criteria in the Standard are appropriate for the existing state of the industry and are achievable by a majority of the participating laboratories. Specific conclusions are that the AMDA criteria are most difficult for the laboratories to achieve; the relative bias criterion is second in difficulty, and the precision criterion presents no problem for the laboratories; most of the participating laboratories can meet the Standard; and failure rates may decrease as the laboratories become more knowledgeable of the performance criteria. 3 refs., 11 figs., 6 tabs

  8. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    Science.gov (United States)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  9. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  10. Evaluation of the indexes of income yield capacity of energetic projects

    International Nuclear Information System (INIS)

    Villanueva M, C.

    2008-01-01

    An economic-financial model to evaluate in the class living room those indexes of profitability of projects of productive infrastructure of the energy sector was developed, as for example: generation projects, transmission and electric energy distribution; projects of transport and distribution of natural gas; projects of cogeneration of vapor and electricity; projects of refinement of petroleum; and other industrial projects. It is described the structure and operation of the pattern, which has been implemented in an Excel calculation sheet that the students use in their personal computers to apply it to the evaluation of the indexes of profitability, specified by the Secretaria de Hacienda y Credito Publico (SHCP) in their limits for the elaboration and presentation of the cost and benefit analysis of the programs and projects of investment of the public sector. The indicators are: present net value VPN, quotient benefits cost B/C, return internal rate TIR, and equivalent annual cost CAE, which should be calculated with methodological rigor according to the SHCP lineaments. The pattern uses the pre-programmed financial functions in the Excel calculation sheet to carry out the compute of the indicators starting from the effective flow of the projects. It is described the technician-economic configuration and the effective flows during the useful life of three power stations of electric power generation that are designed, builds and operated to sell electric power to the national interconnected system in a nodal marginal prices market: a hydroelectric one, a combined cycle power station that uses natural gas, and a nucleo electric. The effective flows are developed and the central profitability of three centrals are evaluated and they are also carried out the corresponding sensitivity analyses and indifference required by the SHCP in their lineaments. Finally, the conditions in that the projects should operate and the prices in those that should sell their

  11. Findings and recommendations of the competency based standards project for radiography

    International Nuclear Information System (INIS)

    Egan, Ingrid

    1993-01-01

    In February 1992, the National Office of Overseas Skills Recognition funded a $150,000 research project for the development of Competency Based Standards for the professions of Medical Radiation Science (MRS). The four professions of MRS are now considered to be: Radiography, Radiation Therapy, Nuclear Medicine Science and Sonography. The four national documents have aimed at describing the performances of the MRS practitioner at entry level to the profession. Findings from survey and interviews indicate that the existing structure of the undergraduate courses should be reviewed with emphasis on: problem solving skills, theater radiography, paediatric radiography, image interpretation or radiography pathology as well as venepuncture, if accepted nationally. . 5 refs., 1 tab., 5 figs

  12. Standard Reference Development of nuclear material for Tensile and Hardness Test Properties

    International Nuclear Information System (INIS)

    Choo, Y. S.; Kim, D. S.; Yoo, B. O.; Ahn, S. B.; Baik, S. J.; Chun, Y. B.; Kim, K. H.; Hong, K. P.; Ryu, W. S.

    2007-12-01

    Standard reference is a official approved data such a coefficient of physics, approved material properties, and etc., which should be analyzed and evaluated by scientific method to acquire official approval for accuracy and credibility of measured data and information. So it could be used broadly and continuously by various fields of nation and society. It is classified to effective standard reference, verified standard reference, and certified standard reference. There are sixteen fields in designated standard references such a physical chemistry field, material field, metal field, and the others. The standard reference of neutron irradiated nuclear structural material is classified to metal field. This report summarized the whole processes about data collection, data production, data evaluation and the suggestion of details evaluation technical standard for tensile and hardness properties, which were achieved by carry out the project 'nuclear material standard reference development' as a result

  13. Standard Reference Development of nuclear material for Tensile and Hardness Test Properties

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Y. S.; Kim, D. S.; Yoo, B. O.; Ahn, S. B.; Baik, S. J.; Chun, Y. B.; Kim, K. H.; Hong, K. P.; Ryu, W. S

    2007-12-15

    Standard reference is a official approved data such a coefficient of physics, approved material properties, and etc., which should be analyzed and evaluated by scientific method to acquire official approval for accuracy and credibility of measured data and information. So it could be used broadly and continuously by various fields of nation and society. It is classified to effective standard reference, verified standard reference, and certified standard reference. There are sixteen fields in designated standard references such a physical chemistry field, material field, metal field, and the others. The standard reference of neutron irradiated nuclear structural material is classified to metal field. This report summarized the whole processes about data collection, data production, data evaluation and the suggestion of details evaluation technical standard for tensile and hardness properties, which were achieved by carry out the project 'nuclear material standard reference development' as a result.

  14. The Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the BWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (NWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities

  15. Data Availability in Appliance Standards and Labeling Program Development and Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Romankiewicz, John [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Khanna, Nina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Vine, Edward [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Zhou, Nan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-05-01

    In this report, we describe the necessary data inputs for both standards development and program evaluation and perform an initial assessment of the availability and uncertainty of those data inputs in China. For standards development, we find that China and its standards and labeling program administrators currently has access to the basic market and technical data needed for conducting market and technology assessment and technological and economic analyses. Some data, such as shipments data, is readily available from the China Energy Label product registration database while the availability of other data, including average unit energy consumption, prices and design options, needs improvement. Unlike some other countries such as the United States, most of the necessary data for conducting standards development analyses are not publicly available or compiled in a consolidated data source. In addition, improved data on design and efficiency options as well as cost data (e.g., manufacturing costs, mark-ups, production and product use-phase costs) – key inputs to several technoeconomic analyses – are particularly in need given China’s unconsolidated manufacturing industry. For program evaluation, we find that while China can conduct simple savings evaluations on its incentive programs with the data it currently has available from the Ministry of Finance – the program administrator, the savings estimates produced by such an evaluation will carry high uncertainty. As such, China could benefit from an increase in surveying and metering in the next one to three years to decrease the uncertainty surrounding key data points such as unit energy savings and free ridership.

  16. An economic analysis methodology for project evaluation and programming.

    Science.gov (United States)

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  17. THE POLITICS OF EVALUATION IN CO-FINANCED PROJECTS: THE CASE OF THE SCOTTISH EXECUTIVE AND THE EVALUATION OF THE STRUCTURAL FUNDS

    Directory of Open Access Journals (Sweden)

    Delia M. Costân

    2009-06-01

    Full Text Available This paper combines an analysis of the different theories expressed in the literature in relation to the process of evaluation and their empirical application to the case of a project evaluation undertaken by the Scottish Executive. The evaluation undertaken by the Scottish Executive is analysed in the context of the various theories and hypotheses expressed in the evaluation literature. Insight into the activity undertaken by the Scottish Executive and access to primary documents used, was facilitated by the author’s participation in a six week internship within the Structural Funds Division of the Scottish Executive. The analysis of the evaluation of the co-financed projects in Scotland revealed that the challenges to the process of evaluation in Scotland resulted in part from the existence of different understandings by the various stakeholders involved in the setting of the goals of the evaluation process. The author’s findings on the application of Article 4 in Scotland are that the different interpretations of Article 4 come from the European Commissions’ general approach to evaluation;, the Scottish Executives’ emphasis on meeting the absorption requirements of the Structural Funds and less on detailed evaluation, and the Programme Management Executives’ focus on supporting the project beneficiaries and less on evaluating the projects.

  18. Evaluation of spectrographic standards for the carrier-distillation analysis of PuO2

    International Nuclear Information System (INIS)

    Martell, C.J.; Myers, W.M.

    1976-05-01

    Three plutonium metals whose impurity contents have been accurately determined are used to evaluate spectrographic standards. Best results are obtained when (1) highly impure samples are diluted, (2) the internal standard, cobalt, is used, (3) a linear curve is fitted to the standard data that bracket the impurity concentration, and (4) plutonium standards containing 22 impurities are used

  19. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, M. [Inst. of Terrestrial Ecology, Grange-over-Sands (United Kingdom); Kellomaeki, S. [Joensuu Univ. (Finland). Dept. of Forestry; Larsen, J.B. [Royal Veterinary Univ., Fredriksberg (Denmark). Dept. of Economics and Natural Resources

    1995-12-31

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  20. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, M [Inst. of Terrestrial Ecology, Grange-over-Sands (United Kingdom); Kellomaeki, S [Joensuu Univ. (Finland). Dept. of Forestry; Larsen, J B [Royal Veterinary Univ., Fredriksberg (Denmark). Dept. of Economics and Natural Resources

    1996-12-31

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  1. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    International Nuclear Information System (INIS)

    Hornung, M.; Kellomaeki, S.; Larsen, J.B.

    1995-01-01

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK's aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  2. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume I: Summary Volume.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the first of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  3. An Effective Model for Efficiency Evaluation of Strategic Project Based on

    Directory of Open Access Journals (Sweden)

    Virgil ROTARU

    2015-10-01

    Full Text Available When analyzing a strategic development project implemented by universities both the system created, as a temporary organization having the participant organizations as distinctive actors and the universities have to be seen as learning organizations. As a consequence, the evaluation of such projects should always be more complex since there are intangible results and outcomes to be considered and an appropriate method for analyze is a must. Such a complex method, initially introduced by Caplan and Norton (1992 as balanced scorecard (BSC was later on developed based on frequently addressed critics. Nevertheless, more than 40% of the biggest 500 companies in the world, use BSC as an evaluation method for their strategic performance and almost all of strategic development projects analysis includes financial and non-financial perspectives as those of BSC. Although a lot of improvements have been done already, there are still very few steps done in the direction of connection BSC with the social networking analysis. This study reflects our actual research aiming to design a more effectiv system for strategic analysis, that to integrate social network analysis and a system dynamics BSC in a more complex analysis method for efficiency evaluation of the strategic project

  4. Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Musante, Patricia

    This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…

  5. Evaluation of the Family/School Partnership Project, Year III, 1996-97.

    Science.gov (United States)

    Kester, Donald L.; Plakos, John; Santos, Will

    The report details the third-year evaluation of a transitional bilingual education project at Chester W. Nimitz Middle School in Huntington Park, California. The Family/School Partnership Project is designed to assist limited English proficient students in mastering English skills to transition to regular classroom activities by integrating…

  6. FY 1999 Report on the technical results. Research and development project for creation of the quick-effect type international standards (Comprehensive surveys); 1999 nendo sokkogata kokusai hyojun sosei kenkyu kaihatsu jigyo seika hokokusho. Sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Safety, environment protection and internationality are most important product qualities, and international standardization of product qualities and testing methods are essential for strengthening international competitiveness. Viewed from this angle, the R and D project is conducted to propose the international standards for the following 5 areas related to environment and safety, selected in expectation that the results could be obtained in short time for preparation of the international proposals; (1) standardization of the wireless IC tags for logistics management, (2) standardization of quality and testing methods of automobile fuels and lubricants, (3) research and development for international standards in the field of safety of machinery, (4) standardization of evaluation methods for electronic data security system, and (5) standardization for the safety of light emitting diodes. The results are obtained for preparation of the international standard drafts, interim or final. The activities are directed to promotion of international interchangeability of radio frequency identification (RFID) systems for area (1); to standardization of the systems for emergency stopping/controlling machines for the area (3), to improvement of security evaluation standards of existing information systems for the area (4), and to unification of the ISO/IEC safety standards for the area (5). (NEDO)

  7. Perioperative Colonic Evaluation in Patients with Rectal Cancer; MR Colonography Versus Standard Care

    DEFF Research Database (Denmark)

    Achiam, Michael Patrick; Løgager, Vibeke; Lund Rasmussen, Vera

    2015-01-01

    RATIONALE AND OBJECTIVES: Preoperative colonic evaluation is often inadequate because of cancer stenosis making a full conventional colonoscopy (CC) impossible. In several studies, cancer stenosis has been shown in up to 16%-34% of patients with colorectal cancer. The purpose of this study...... was to prospectively evaluate the completion rate of preoperative colonic evaluation and the quality of perioperative colonic evaluation using magnetic resonance colonography (MRC) in patients with rectal cancer. MATERIALS AND METHODS: Patients diagnosed with rectal cancer were randomized to either group A: standard...... preoperative diagnostic work-up or group B: preoperative MR diagnostic work-up (standard preoperative diagnostic work-up + MRC). A complete and adequate perioperative clean-colon evaluation (PCE) was defined as either a complete preoperative colonic evaluation or a complete colonic evaluation within 3 months...

  8. Evaluating IPCC AR4 cool-season precipitation simulations and projections for impacts assessment over North America

    Energy Technology Data Exchange (ETDEWEB)

    McAfee, Stephanie A. [The University of Arizona, Department of Geosciences, Tucson, AZ (United States); The Wilderness Society, Anchorage, AK (United States); Russell, Joellen L.; Goodman, Paul J. [The University of Arizona, Department of Geosciences, Tucson, AZ (United States)

    2011-12-15

    General circulation models (GCMs) have demonstrated success in simulating global climate, and they are critical tools for producing regional climate projections consistent with global changes in radiative forcing. GCM output is currently being used in a variety of ways for regional impacts projection. However, more work is required to assess model bias and evaluate whether assumptions about the independence of model projections and error are valid. This is particularly important where models do not display offsetting errors. Comparing simulated 300-hPa zonal winds and precipitation for the late 20th century with reanalysis and gridded precipitation data shows statistically significant and physically plausible associations between positive precipitation biases across all models and a marked increase in zonal wind speed around 30 N, as well as distortions in rain shadow patterns. Over the western United States, GCMs project drier conditions to the south and increasing precipitation to the north. There is a high degree of agreement between models, and many studies have made strong statements about implications for water resources and about ecosystem change on that basis. However, since one of the mechanisms driving changes in winter precipitation patterns appears to be associated with a source of error in simulating mean precipitation in the present, it suggests that greater caution should be used in interpreting impacts related to precipitation projections in this region and that standard assumptions underlying bias correction methods should be scrutinized. (orig.)

  9. Performance and Complexity Co-evaluation of the Advanced Video Coding Standard for Cost-Effective Multimedia Communications

    Directory of Open Access Journals (Sweden)

    Saponara Sergio

    2004-01-01

    Full Text Available The advanced video codec (AVC standard, recently defined by a joint video team (JVT of ITU-T and ISO/IEC, is introduced in this paper together with its performance and complexity co-evaluation. While the basic framework is similar to the motion-compensated hybrid scheme of previous video coding standards, additional tools improve the compression efficiency at the expense of an increased implementation cost. As a first step to bridge the gap between the algorithmic design of a complex multimedia system and its cost-effective realization, a high-level co-evaluation approach is proposed and applied to a real-life AVC design. An exhaustive analysis of the codec compression efficiency versus complexity (memory and computational costs project space is carried out at the early algorithmic design phase. If all new coding features are used, the improved AVC compression efficiency (up to 50% compared to current video coding technology comes with a complexity increase of a factor 2 for the decoder and larger than one order of magnitude for the encoder. This represents a challenge for resource-constrained multimedia systems such as wireless devices or high-volume consumer electronics. The analysis also highlights important properties of the AVC framework allowing for complexity reduction at the high system level: when combining the new coding features, the implementation complexity accumulates, while the global compression efficiency saturates. Thus, a proper use of the AVC tools maintains the same performance as the most complex configuration while considerably reducing complexity. The reported results provide inputs to assist the profile definition in the standard, highlight the AVC bottlenecks, and select optimal trade-offs between algorithmic performance and complexity.

  10. Evaluation of a diabetes nurse specialist prescribing project.

    Science.gov (United States)

    Wilkinson, Jill; Carryer, Jenny; Adams, Jeffery

    2014-08-01

    To evaluate the diabetes nurse specialist prescribing project with the aim of determining whether diabetes nurse specialist prescribing is safe and effective and to inform the implementation and extension of registered nurse prescribing. Registered nurses in many countries are able to prescribe medicines, but in New Zealand, prior to the diabetes nurse specialist project, nurse practitioners were the only nurses who could prescribe medicines. New regulations allowed the nurses to prescribe a limited number of prescription medicines. The study was a process and outcome clinical programme evaluation. The project took place between April-September 2011 and involved 12 diabetes nurse specialist in four localities. Quantitative data were collected from clinical records maintained by the diabetes nurse specialist for the project (1274 patients and 3402 prescribing events), from surveys with stakeholders (general practitioners, n = 30; team members, n = 19; and patients, n = 89) and audits from patient notes (n = 117) and prescriptions (n = 227), and qualitative data from interviews with project participants (n = 18) and patients (n = 19). All data were analysed descriptively. Diabetes nurse specialist prescribing was determined to be safe, of high quality and appropriate. It brought important benefits to the effectiveness of specialist diabetes services, was acceptable to patients and was supported by the wider healthcare team. These findings are consistent with the findings reported in the international literature about nurse prescribing in a range of different practice areas. Clarification of the education and competence requirements and resourcing for the ongoing supervision of nurses is recommended if the prescribing model is to be extended. Diabetes nurse specialist prescribing improved access to medicines by providing a more timely service. Nurses felt more satisfied with their work because they could independently provide a complete episode of care

  11. An Evaluation of the Agriculture Science Project in Mauritius. African Studies in Curriculum Development & Evaluation No. 102.

    Science.gov (United States)

    Jeeroburkhan, M. Fazal

    This study evaluated the Agricultural Curriculum Project which is being implemented in 16 secondary schools in Mauritius. Specific areas examined included: (1) the relevance, appropriateness, and practicability of the project's general objectives; (2) the relevance, balance, and organization of the course content; (3) the effectiveness and…

  12. Evaluation on applicability of the rules, regulations, and industrial codes and standards for SMART development

    International Nuclear Information System (INIS)

    Choi, Suhn; Lee, C C.; Lee, C.K.; Kim, K.K.; Kim, J.P.; Kim, J.H.; Cho, B.H.; Kang, D J.; Bae, G.H.; Chung, M.; Chang, M.H.

    1999-03-01

    In this report, evaluation on applicability of the rules, regulations, and industrial codes and standards for SMART has been made. As the first step, past-to-present status of licensing structures were reviewed. Then, the rules, regulations, and standards applied to YGN 3-6 were listed and reviewed. Finally, evaluation on applicability of such rules and standards for SMART are made in each design fields. During this step technical evaluations on each items of rules, regulations and standards are made and the possible remedies or comments are suggested. The results are summarized in a tabular form and enclosed as Appendix. (Author). 8 refs., 5 tabs., 3 figs

  13. Performance evaluation of emerging JPEGXR compression standard for medical images

    International Nuclear Information System (INIS)

    Basit, M.A.

    2012-01-01

    Medical images require loss less compression as a small error due to lossy compression may be considered as a diagnostic error. JPEG XR is the latest image compression standard designed for variety of applications and has a support for lossy and loss less modes. This paper provides in-depth performance evaluation of latest JPEGXR with existing image coding standards for medical images using loss less compression. Various medical images are used for evaluation and ten images of each organ are tested. Performance of JPEGXR is compared with JPEG2000 and JPEGLS using mean square error, peak signal to noise ratio, mean absolute error and structural similarity index. JPEGXR shows improvement of 20.73 dB and 5.98 dB over JPEGLS and JPEG2000 respectively for various test images used in experimentation. (author)

  14. Evaluating the Effectiveness of Collaborative Computer-Intensive Projects in an Undergraduate Psychometrics Course

    Science.gov (United States)

    Barchard, Kimberly A.; Pace, Larry A.

    2010-01-01

    Undergraduate psychometrics classes often use computer-intensive active learning projects. However, little research has examined active learning or computer-intensive projects in psychometrics courses. We describe two computer-intensive collaborative learning projects used to teach the design and evaluation of psychological tests. Course…

  15. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  16. Workplace Literacy Program (WPL) at Chinatown Manpower Project, Inc. Final Evaluation.

    Science.gov (United States)

    Friedenberg, Joan E.

    This document describes the procedures for and results of the external evaluation of the workplace literacy program for underemployed garment industry workers with low English skills at Chinatown Manpower Project, Inc. in Chinatown in New York City. The document describes the evaluation design and methodology as well as the evaluation results,…

  17. ACCOUNTING STANDARD SETTING IN THE INTERNATIONAL ARENA: UPDATE ON THE CONVERGENCE PROJECT

    Directory of Open Access Journals (Sweden)

    Bonaci Carmen Giorgiana

    2012-07-01

    Full Text Available Our paper contributes to the literature on international accounting by focusing on the standard setting process. As documented by research literature, accounting regulation can enhance corporate governance (Melis and Carta, 2010, corporate reporting being expected to reduce information asymmetry. Based on accounting research and trade literature we first synthesize recent evolutions in the international accounting arena. We therefore position our study within current realities significantly marked by uncertainty in relation to the world wide globalization process. The objective of our paper is to perform an analysis that would help assess further developments of the convergence project. This is done by looking at the current status of the projects being developed under the IASB –FASB collaboration, as well as by developing a comparison between IFRS and US GAAP. The employed research methodology relies on analyzing data provided through the IASB and the FASB’s websites, as well as other official documents being issued by the two Boards. The assessment of the projects was done by reviewing exposure documents and monitoring the Boards’ deliberations, while the developed comparison requires accounting regulations content analysis. Concluding upon the Boards’ ongoing projects, we might identify areas in which convergence seems to be quite close (such as revenue recognition and leasing, but also areas in which convergence becomes even more challenging (such as financial instruments or the particular case of offsetting. Similar to other studies being developed within accounting research and trade literature (SEC 2011: 8 we may conclude that, generally, US GAAP present more detailed, specific requirements than IFRS.

  18. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  19. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  20. The effect of the SQUIRE (Standards of QUality Improvement Reporting Excellence) guidelines on reporting standards in the quality improvement literature: a before-and-after study.

    Science.gov (United States)

    Howell, Victoria; Schwartz, Amanda Eva; O'Leary, James Daniel; Mc Donnell, Conor

    2015-06-01

    The SQUIRE (Standards of QUality Improvement Reporting Excellence) guidelines were developed to improve the reporting of quality improvement (QI) projects. The effect of the guidelines on the completeness of reporting in the QI literature is unknown. Our primary objective was to determine if the completeness of reporting in the QI literature has been improved[OUP_CE13] since the introduction of the SQUIRE guidelines. We performed a before-and-after evaluation of QI articles selected from four prominent journals of healthcare quality. Twenty-five articles published in each of two time periods (2006-2008 and 2010-2011) were confirmed to be QI projects using a standardised definition and were independently evaluated by two investigators as an interim evaluation of a planned larger sample. Articles were assessed using 50 statements of the SQUIRE guidelines, and the overall change in the completeness of reporting between the two groups was determined. The value of pimprovement observed in the completeness of reporting of QI projects after the publication of the SQUIRE guidelines, and the study was stopped early. There is potential for improvement in reporting standards, particularly for those guideline items or statements specific to QI projects. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  1. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  2. Project Rulison: post-shot plans and evaluations

    Energy Technology Data Exchange (ETDEWEB)

    1969-12-01

    Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.

  3. Parent Early Evaluation of Kids: PEEK Outreach Training Project. Final Report.

    Science.gov (United States)

    Squires, Jane; Twombly, Liz; Yockelson, Sue

    This report describes achievements and activities of the Parent Early Evaluation of Kids (PEEK) Outreach Project at the University of Oregon. This project focused on assisting state agencies, regional and tribal entities, and local health and education programs to develop comprehensive, low-cost systems for child-find and referral. Rural and inner…

  4. Process evaluation of a community-based adolescent obesity prevention project in Tonga

    Directory of Open Access Journals (Sweden)

    Pomana Siosifa

    2011-05-01

    Full Text Available Abstract Background The rising burden of obesity in Tonga is alarming. The promotion of healthy behaviours and environments requires immediate urgent action and a multi-sectoral approach. A three-year community based study titled the Ma'alahi Youth Project (MYP conducted in Tonga from 2005-2008 aimed to increase the capacity of the whole community (schools, churches, parents and adolescents to promote healthy eating and regular physical activity and to reduce the prevalence of overweight and obesity amongst youth and their families. This paper reflects on the process evaluation for MYP, against a set of Best Practice Principles for community-based obesity prevention. Methods MYP was managed by the Fiji School of Medicine. A team of five staff in Tonga were committed to planning, implementation and evaluation of a strategic plan, the key planks of which were developed during a two day community workshop. Intervention activities were delivered in villages, churches and schools, on the main island of Tongatapu. Process evaluation data covering the resource utilisation associated with all intervention activities were collected, and analysed by dose, frequency and reach for specific strategies. The action plan included three standard objectives around capacity building, social marketing and evaluation; four nutrition; two physical activity objectives; and one around championing key people as role models. Results While the interventions included a wide mix of activities straddling across all of these objectives and in both school and village settings, there was a major focus on the social marketing and physical activity objectives. The intervention reach, frequency and dose varied widely across all activities, and showed no consistent patterns. Conclusions The adolescent obesity interventions implemented as part of the MYP program comprised a wide range of activities conducted in multiple settings, touched a broad spectrum of the population (wider

  5. Evaluation of a workplace engagement project for people with younger onset dementia.

    Science.gov (United States)

    Robertson, Jacinta; Evans, David

    2015-08-01

    In 2011, a workplace project was established to provide a small group of people who had younger onset dementia with the opportunity to return to the workplace. The project sought to explore the feasibility and safety of engaging these younger people in workplace activities if an appropriate framework of support was provided. Opportunities to engage in meaningful activities are quite limited for younger people with dementia because services are targeted at an older client population. A qualitative exploratory approach was used for the project evaluation. Participants were people who were 65 years or younger and had a diagnosis of dementia. They attended a large metropolitan hardware store one day per week and worked beside a store employee for a four hour work shift. Evaluation of the project included observation of participant's engagement in the workplace, adverse events and a qualitative analysis that used participant-nominated good project outcomes. Nine people with a mean age of 58·8 years participated in the project. Six of these participants have been engaged at the workplace for more than two years. All participants were able to gain the skills needed to complete their respective work duties. Participants initially assisted with simple work tasks, but over time, they were able to expand their range of duties to include more complex activities such as customer sales. Participants achieved their nominated good outcomes of improved well-being, engaging in worthwhile activities, contributing to society and socialisation. The evaluation has shown that this workplace programme is a viable model of engagement for younger people with dementia. This evaluation offers a practical demonstration that it is feasible and safe to provide opportunities for younger people with dementia to engage in meaningful activities in the community if appropriate support is provided. © 2015 John Wiley & Sons Ltd.

  6. Valuation of Construction Projects Based on of Quantity Scale by using Expert System

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-02-01

    Full Text Available The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation. The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

  7. Project, construction and characterization of ionization chambers for use as standard systems in X and gamma radiation beams

    International Nuclear Information System (INIS)

    Perini, Ana Paula

    2013-01-01

    Ionization chambers present some advantages in relation to other dosimeters: easiness of handling, low energy dependence and high precision. The advantages associated to ionization chambers and the large number of diagnostic radiology exams and therapeutic treatments motivated the development of this PhD program. In this project ionization chambers were developed and characterized to be applied in diagnostic radiology and therapy beam dosimetry, with high precision and performance, in compliance with international recommendations. They were assembled in a simple way, utilizing low-cost national materials, so they can be reproduced and applied at calibration laboratories. The project of these ionization chambers presents some differences in relation to commercial ionization chambers, as the materials utilized and geometrical arrangements. Besides the development of the ionization chambers to be utilized in standard X-ray beam dosimetry as work standard systems, two graphite parallel-plate ionization chambers were developed and characterized to be applied as reference standard systems for determining the air kerma rates of gamma radiation sources. Comparing the air kerma rates determined with the reference standard of the Calibration Laboratory of IPEN, a Farmer ionization chamber, with the values of the air kerma rates obtained with the graphite ionization chambers, the maximum differences obtained were only 1.7% and 1.2% for the G1 and G2 graphite ionization chambers, respectively. Moreover, these ionization chambers presented correction factors close to 1.000, which is ideal for an ionization chamber be characterized as a reference standard system. (author)

  8. Fiscal 1999 technical achievement report. Research and development project on the quickly effective international standards creation (Standardization of information security system evaluating methods); 1999 nendo sokkogata kokusai hyojun sosei kenkyu kaihatsu jigyo seika hokokusho. Joho security system no hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For standardization under information security evaluation criteria, an evaluating technique CEM (Common Methodology for Information Technology Security Evaluation) was constructed as ISI/IEC15408. The method, however, is abstract in content and the evaluation work thereunder requires much time and accompanies economic difficulties. In dealing with the situation, investigations were conducted into security evaluation related techniques and manufacturing/quality control techniques in use at information processing product developing sites, and a CEM technique is materialized. Using the proposed technique, developers themselves can evaluate security in the development process and workloads imposed on evaluating organizations may be reduced because evidential items necessary for 3rd party evaluation may be gathered. Since the developed technique is verified by an official evaluating organization, it is expected to be an effective techniques not contradicting existing operating techniques. It may be also said that this technique is a method whereby developers will collect evidential items necessary for their development efforts. The result will be presented in the form of a proposal for an evaluating techniques standard for ISO/IEC JTC1 SC27. (NEDO)

  9. No-gold-standard evaluation of image-acquisition methods using patient data.

    Science.gov (United States)

    Jha, Abhinav K; Frey, Eric

    2017-02-11

    Several new and improved modalities, scanners, and protocols, together referred to as image-acquisition methods (IAMs), are being developed to provide reliable quantitative imaging. Objective evaluation of these IAMs on the clinically relevant quantitative tasks is highly desirable. Such evaluation is most reliable and clinically decisive when performed with patient data, but that requires the availability of a gold standard, which is often rare. While no-gold-standard (NGS) techniques have been developed to clinically evaluate quantitative imaging methods, these techniques require that each of the patients be scanned using all the IAMs, which is expensive, time consuming, and could lead to increased radiation dose. A more clinically practical scenario is where different set of patients are scanned using different IAMs. We have developed an NGS technique that uses patient data where different patient sets are imaged using different IAMs to compare the different IAMs. The technique posits a linear relationship, characterized by a slope, bias, and noise standard-deviation term, between the true and measured quantitative values. Under the assumption that the true quantitative values have been sampled from a unimodal distribution, a maximum-likelihood procedure was developed that estimates these linear relationship parameters for the different IAMs. Figures of merit can be estimated using these linear relationship parameters to evaluate the IAMs on the basis of accuracy, precision, and overall reliability. The proposed technique has several potential applications such as in protocol optimization, quantifying difference in system performance, and system harmonization using patient data.

  10. Preparation, Delivery, and Evaluation of Picomole Vapor Standards

    Science.gov (United States)

    2013-07-10

    trace vapor standards is consistent production and a reliable means to transport and deliver the vapor to the analytical system being evaluated...8 32.6 8.92 Ethylbenzene 100-41-4 9.21 8.31x10-9 32.8 8.41 1,7-Octadiene 3710-30-3 22.5 4.74x10-9 31.8 10.7 Styrene 100-42-5 6.21 2.77x10-9 31.9

  11. Evaluating IS/IT Projects: Revealing the Causes of Equivocality

    NARCIS (Netherlands)

    Arviansyah, A.; Spil, Antonius A.M.; van Hillegersberg, Jos

    2013-01-01

    Evaluating IS/IT projects and deciding on their continuation has been hampered by the problem of equivocality. Equivocal situations hinder decision-makers to clearly recognise potential problems and implications of these decisions, as well as to decide the course of action in a purposeful fashion.

  12. The Millennium Villages Project: a retrospective, observational, endline evaluation

    Directory of Open Access Journals (Sweden)

    Shira Mitchell, PhD

    2018-05-01

    Full Text Available Summary: Background: The Millennium Villages Project (MVP was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs. In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. Methods: In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Findings: Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero. Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the

  13. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    Science.gov (United States)

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  14. DOE technical standards list. Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listing of current DOE technical standards, non-Government standards that have been adopted by DOE, other Government documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  15. Project evaluation for energy supply in rural areas of developing countries

    DEFF Research Database (Denmark)

    Vidal, Rene Victor Valqui; Christensen, J. M.

    1990-01-01

    This paper reports the methodological experiences of the project: Energy Supply Technologies in Developing Countries, carried out in collaboration with the Department of Energy, Zambia. Existing methods for project evaluation, based on cost-benefit analysis, will be briefly presented, particularly...... as regards their inadequacy for assessing energy projects in rural areas.An alternative practical and PC-based approach will be presented in which emphasis is placed on the problem formulation phase, including the socio-economic, cultural and political aspects of the problem. This approach has been prepared...

  16. METHODOLOGY FOR PROJECTION OF OCCUPATIONAL TRENDS IN THE DENVER STANDARD METROPOLITAN STATISTICAL AREA.

    Science.gov (United States)

    FISHMAN, LESLIE; AND OTHERS

    THE FINAL STAGE OF A PROGRAM FOR ACHIEVING A BALANCE BETWEEN THE AGGREGATE SUPPLY AND DEMAND FOR LABOR IS THE DISTRIBUTION OF THE INDUSTRY EMPLOYMENT ESTIMATES INTO OCCUPATIONAL REQUIREMENTS BASED ON PROJECTIONS OF OCCUPATIONAL PATTERNS BY INDUSTRY. THIS CAN BE USED TO EVALUATE POTENTIAL AREAS OF SUBSTANTIAL SURPLUS OR SHORTAGE, AND PROVIDE THE…

  17. Task-based evaluation of segmentation algorithms for diffusion-weighted MRI without using a gold standard

    International Nuclear Information System (INIS)

    Jha, Abhinav K; Kupinski, Matthew A; Rodríguez, Jeffrey J; Stephen, Renu M; Stopeck, Alison T

    2012-01-01

    In many studies, the estimation of the apparent diffusion coefficient (ADC) of lesions in visceral organs in diffusion-weighted (DW) magnetic resonance images requires an accurate lesion-segmentation algorithm. To evaluate these lesion-segmentation algorithms, region-overlap measures are used currently. However, the end task from the DW images is accurate ADC estimation, and the region-overlap measures do not evaluate the segmentation algorithms on this task. Moreover, these measures rely on the existence of gold-standard segmentation of the lesion, which is typically unavailable. In this paper, we study the problem of task-based evaluation of segmentation algorithms in DW imaging in the absence of a gold standard. We first show that using manual segmentations instead of gold-standard segmentations for this task-based evaluation is unreliable. We then propose a method to compare the segmentation algorithms that does not require gold-standard or manual segmentation results. The no-gold-standard method estimates the bias and the variance of the error between the true ADC values and the ADC values estimated using the automated segmentation algorithm. The method can be used to rank the segmentation algorithms on the basis of both the ensemble mean square error and precision. We also propose consistency checks for this evaluation technique. (paper)

  18. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  19. Current situation of International Organization for Standardization/Technical Committee 249 international standards of traditional Chinese medicine.

    Science.gov (United States)

    Liu, Yu-Qi; Wang, Yue-Xi; Shi, Nan-Nan; Han, Xue-Jie; Lu, Ai-Ping

    2017-05-01

    To review the current situation and progress of traditional Chinese medicine (TCM) international standards, standard projects and proposals in International Organization for Standardization (ISO)/ technical committee (TC) 249. ISO/TC 249 standards and standard projects on the ISO website were searched and new standard proposals information were collected from ISO/TC 249 National Mirror Committee in China. Then all the available data were summarized in 5 closely related items, including proposed time, proposed country, assigned working group (WG), current stage and classifification. In ISO/TC 249, there were 2 international standards, 18 standard projects and 24 new standard proposals proposed in 2014. These 44 standard subjects increased year by year since 2011. Twenty-nine of them were proposed by China, 15 were assigned to WG 4, 36 were in preliminary and preparatory stage and 8 were categorized into 4 fifields, 7 groups and sub-groups based on International Classifification Standards. A rapid and steady development of international standardization in TCM can be observed in ISO/TC 249.

  20. Adoption of projected mortality table for the Slovenian market using the Poisson log-bilinear model to test the minimum standard for valuing life annuities

    Directory of Open Access Journals (Sweden)

    Darko Medved

    2015-01-01

    Full Text Available With the introduction of Solvency II a consistent market approach to the valuation of insurance assets and liabilities is required. For the best estimate of life annuity provisions one should estimate the longevity risk of the insured population in Slovenia. In this paper the current minimum standard in Slovenia for calculating pension annuities is tested using the Lee-Carter model. In particular, the mortality of the Slovenian population is projected using the best fit from the stochastic mortality projections method. The projected mortality statistics are then corrected with the selection effect and compared with the current minimum standard.

  1. ANSI/ASHRAE/IES Standard 90.1-2013 Determination of Energy Savings: Qualitative Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, Mark A.; Rosenberg, Michael I.; Hart, Philip R.; Richman, Eric E.; Athalye, Rahul A.; Winiarski, David W.

    2014-09-04

    This report provides a final qualitative analysis of all addenda to ANSI/ASHRAE/IES Standard 90.1-2010 (referred to as Standard 90.1-2010 or 2010 edition) that were included in ANSI/ASHRAE/IES Standard 90.1-2013 (referred to as Standard 90.1-2013 or 2013 edition). All addenda in creating Standard 90.1-2013 were evaluated for their projected impact on energy efficiency. Each addendum was characterized as having a positive, neutral, or negative impact on overall building energy efficiency.

  2. Evaluation of the Treatment of Diabetic Retinopathy A Research Project

    Science.gov (United States)

    Kupfer, Carl

    1973-01-01

    Evaluated is the treatment of diabetic retinopathy (blindness due to ruptured vessels of the retina as a side effect of diabetes), and described is a research project comparing two types of photocoagulation treatment. (DB)

  3. Minimum intensity projection technique in the evaluation of pulmonary emphysema

    International Nuclear Information System (INIS)

    Ishii, Chikako; Tada, Shinpei; Fukuda, Kunihiko; Hayashi, Naganobu

    2000-01-01

    Clinically diagnosed 30 pulmonary emphysema patients were evaluated with helical CT. From 10 mm thickness and 10 mm/sec table speed helical CT date set, minimum intensity projection (Min-IP) were generated. Min-IP coronal images were well demonstrated distribution and degree of emphysema. Compared to the high resolution CT images (2 mm thickness), Min-IP images were as same as well evaluated the disease. Min-IP technique seem to be useful for evaluate distribution and degree of pulmonary emphysema. (author)

  4. AN EVALUATION OF SELECTED MOROCCAN ELT TEXTBOOKS: A STANDARDS-BASED APPROACH PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    Hassan Ait Bouzid

    2017-05-01

    Full Text Available Standards-Based Approach to textbook evaluation has been blooming in recent decades. Nevertheless, this practice has received very little attention in Morocco.  The present study aims to bridge a gap in the literature of the Moroccan context by investigating the extent to which three locally designed ELT textbooks conform to the theoretical principles of the Standards-Based Approach which defines the teaching of English as a foreign language in the country (Ministry of National Education, 2007. Its objective is to examine whether and how these textbooks present contents that enable learners to meet the content standards included in the goal areas of Communications, Cultures, Connections and Comparisons. The study is informed by the theoretical framework of the Standards-Based Approach. It adopts a mixed-methods design that uses content analysis as a mixed data analysis method combining both quantitative and qualitative techniques. The findings reveal a number of shortcomings relevant to the representation of the content standards as several standards are not sufficiently addressed in the activities included in these textbooks. Eventually, some suggestions are addressed to policy makers, textbook designers and teachers to overcome the identified problems in current and future textbooks. The study is expected to sensitize ELT practitioners about the viability of using textbook evaluation in boosting both the quality of ELT textbooks and the quality of the teaching learning outcomes.

  5. Fiscal 2000 project for development of international standards for supporting novel industries. Standardization for securement of interconnection between intelligent home electric appliances; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo. Johokadenkiki kan no sogo setsuzokusei kakuho no tameno hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Research and development had been under way since fiscal 1998 for working out propositions relating to the international standardization of connection interface systems for digital AV (audio-visual) equipment. This report outlines the result of the project in its fiscal last year. The link working group (WG) actually built a transceiver at 5 mm pitch in its second trial, measured and evaluated its behavior under high-temperature and high-humidity circumstances, and acquired numerical data for interface specifications. The connection interface WG in its second trial fabricated a tiny optical connector for POF (plastic optical fiber) and evaluated its resistance to environment. As the result, sufficient resistance to environment was detected in the connector, and then a proposition was presented to IEC/TC86 that the connector be standardized as an optical connector for intelligent home electric appliances. The POF optimization WG performed an environment resistant test for POF, similar to those for transceivers and connectors, and then recognized that POF of the GI type was low in transmission loss and that it stably retained its wide-band feature. (NEDO)

  6. The rate commitment to ISO 214 standard among the persian abstracts of approved research projects at school of health management and medical informatics, Isfahan University of Medical Sciences, Isfahan, Iran.

    Science.gov (United States)

    Papi, Ahmad; Khalaji, Davoud; Rizi, Hasan Ashrafi; Shabani, Ahmad; Hassanzadeh, Akbar

    2014-01-01

    Commitment to abstracting standards has a very significant role in information retrieval. The present research aimed to evaluate the rate of Commitment to ISO 214 Standard among the Persian abstracts of approved research projects at School of Health Management and Medical Informatics, Isfahan University of Medical Sciences, Isfahan, Iran. This descriptive study used a researcher-made checklist to collect data, which was then analyzed through content analysis. The studied population consisted of 227 approved research projects in the School of Health Management and Medical Informatics, Isfahan University of Medical Sciences during 2001-2010. The validity of the checklist was measured by face and content validity. Data was collected through direct observations. Statistical analyzes including descriptive (frequency distribution and percent) and inferential statistics (Chi-square test) were performed in SPSS-16. The highest and lowest commitment rates to ISO 214 standard were in using third person pronouns (100%) and using active verbs (34/4%), respectively. In addition, the highest commitment rates to ISO 214 standard (100%) related to mentioning third person pronouns, starting the abstract with a sentence to explain the subject of the research, abstract placement, and including keyword in 2009. On the other hand, during 2001-2003, the lowest commitment rate was observed in reporting research findings (16/7%). Moreover, various educational groups differed significantly only in commitment to study goals, providing research findings, and abstaining from using abbreviations, signs, and acronyms. Furthermore, educational level of the corresponding author was significantly related with extracting the keywords from the text. Other factors of ISO 214 standard did not have significant relations with the educational level of the corresponding author. In general, a desirable rate of commitment to ISO 214 standard was observed among the Persian abstracts of approved research

  7. Radiation therapy: model standards for determination of need

    International Nuclear Information System (INIS)

    Lagasse, L.G.; Devins, T.B.

    1982-03-01

    Contents: Health planning process; Health care requirements (model for projecting need for megavoltage radiation therapy); Operational objectives (manpower, megavoltage therapy and treatment planning equipment, support services, management and evaluation of patient care, organization and administration); Compliance with other standards imposed by law; Financial feasibility and capability; Reasonableness of expenditures and costs; Relative merit; Environmental impact

  8. Service Learning in Medical Education: Project Description and Evaluation

    Science.gov (United States)

    Borges, Nicole J.; Hartung, Paul J.

    2007-01-01

    Although medical education has long recognized the importance of community service, most medical schools have not formally nor fully incorporated service learning into their curricula. To address this problem, we describe the initial design, development, implementation, and evaluation of a service-learning project within a first-year medical…

  9. Efficiency in the execution of environmental standards for hydropower projects; Eficiencia na execucao das normas ambientais para empreendimentos hidreletricos

    Energy Technology Data Exchange (ETDEWEB)

    Nadaud, Gabriela Caiuby Ariani; Young, Carlos Eduardo Frickmann [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil)

    2010-07-01

    In the search for greater efficiency in meeting environmental standards related to hydropower projects, this article presents a proposal of indicators that can guide the entrepreneur. From the observation that the mere compliance with legal requirements for obtaining licenses does not minimize the risks of conflicts and their resulting expenses, this methodology of indicators is presented as a tool that allows more efficient compensation measures and consequent social-environmental cost reductions of hydroelectric projects. (author)

  10. Construction Projects Focus on Evaluation and Its Benefits by Pre-planning

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    are evaluations carried out? And which trade group focus most on evaluations? The study is based on a questionnaire survey for the most common trade groups in the Danish construction industry, where 167 respondents completed the survey. Findings indicate that the architect’s has most focus on evaluation in both...... internal and external project association; and evaluation has a minor focus for all the respondents where 64.5 % answer that they never, or rarely evaluate; and only a third 34.9 % of the respondents indicate that they evaluate sometimes or frequently....

  11. Project Management in the Universidad de Oriente: Improvement of the Ex-Antes Evaluation

    Directory of Open Access Journals (Sweden)

    Yilian Rodríguez-Clavijo

    2017-06-01

    Full Text Available The objective of this study was to demonstrate the importance of ex-ante evaluation as a tool for the management of science and innovation projects at the Universidad de Oriente. For the theoretical analysis we used the methods analysis - synthesis and historical - logic. In the empirical analysis, participant observation, work with a team of experts and brainstorming were used as techniques and tools. The methodological design of the evaluation was defined according to four aspects established by the Organization for Economic Cooperation and Development: field, purpose, criteria and organization. The results of the application of the methodology are presented to the projects to selected projects; which allowed diagnosing the quality of the projects, the areas with the most deficiencies, as well as the aspects that limit the design of the proposals.

  12. Standardized cardiovascular data for clinical research, registries, and patient care: a report from the Data Standards Workgroup of the National Cardiovascular Research Infrastructure project.

    Science.gov (United States)

    Anderson, H Vernon; Weintraub, William S; Radford, Martha J; Kremers, Mark S; Roe, Matthew T; Shaw, Richard E; Pinchotti, Dana M; Tcheng, James E

    2013-05-07

    Relatively little attention has been focused on standardization of data exchange in clinical research studies and patient care activities. Both are usually managed locally using separate and generally incompatible data systems at individual hospitals or clinics. In the past decade there have been nascent efforts to create data standards for clinical research and patient care data, and to some extent these are helpful in providing a degree of uniformity. Nonetheless, these data standards generally have not been converted into accepted computer-based language structures that could permit reliable data exchange across computer networks. The National Cardiovascular Research Infrastructure (NCRI) project was initiated with a major objective of creating a model framework for standard data exchange in all clinical research, clinical registry, and patient care environments, including all electronic health records. The goal is complete syntactic and semantic interoperability. A Data Standards Workgroup was established to create or identify and then harmonize clinical definitions for a base set of standardized cardiovascular data elements that could be used in this network infrastructure. Recognizing the need for continuity with prior efforts, the Workgroup examined existing data standards sources. A basic set of 353 elements was selected. The NCRI staff then collaborated with the 2 major technical standards organizations in health care, the Clinical Data Interchange Standards Consortium and Health Level Seven International, as well as with staff from the National Cancer Institute Enterprise Vocabulary Services. Modeling and mapping were performed to represent (instantiate) the data elements in appropriate technical computer language structures for endorsement as an accepted data standard for public access and use. Fully implemented, these elements will facilitate clinical research, registry reporting, administrative reporting and regulatory compliance, and patient care

  13. Imperfect Gold Standards for Kidney Injury Biomarker Evaluation

    Science.gov (United States)

    Betensky, Rebecca A.; Emerson, Sarah C.; Bonventre, Joseph V.

    2012-01-01

    Clinicians have used serum creatinine in diagnostic testing for acute kidney injury for decades, despite its imperfect sensitivity and specificity. Novel tubular injury biomarkers may revolutionize the diagnosis of acute kidney injury; however, even if a novel tubular injury biomarker is 100% sensitive and 100% specific, it may appear inaccurate when using serum creatinine as the gold standard. Acute kidney injury, as defined by serum creatinine, may not reflect tubular injury, and the absence of changes in serum creatinine does not assure the absence of tubular injury. In general, the apparent diagnostic performance of a biomarker depends not only on its ability to detect injury, but also on disease prevalence and the sensitivity and specificity of the imperfect gold standard. Assuming that, at a certain cutoff value, serum creatinine is 80% sensitive and 90% specific and disease prevalence is 10%, a new perfect biomarker with a true 100% sensitivity may seem to have only 47% sensitivity compared with serum creatinine as the gold standard. Minimizing misclassification by using more strict criteria to diagnose acute kidney injury will reduce the error when evaluating the performance of a biomarker under investigation. Apparent diagnostic errors using a new biomarker may be a reflection of errors in the imperfect gold standard itself, rather than poor performance of the biomarker. The results of this study suggest that small changes in serum creatinine alone should not be used to define acute kidney injury in biomarker or interventional studies. PMID:22021710

  14. Evaluation of the midwifery pilot projects in Quebec: an overview. L'Equipe d'Evaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Blais, R; Joubert, P

    2000-01-01

    In 1990, the province of Quebec adopted a law authorizing the evaluation of the practice of midwifery through eight pilot projects. The projects, which took the form of birth centres outside hospitals, started operating in 1994. The objectives of the evaluation were 1) to compare midwives' services to current physician services with regard to maternal and neonatal mortality and morbidity, the use of obstetrical intervention, individualization and continuity of care as perceived by clients, and cost; and 2) to identify the professional and organizational factors associated with the integration of midwives into the health care system. A mixed evaluative design was used: a multiple case study with each pilot project representing a case and a cohort study where 1,000 women followed by midwives in the birth centres were matched with 1,000 women followed by physicians in the usual hospital-based services. Various quantitative and qualitative data collection instruments were used. Overall, many results were favourable to midwifery practice, while some were favourable to medical care. Following the evaluation, the Government of Quebec decided to legalize the practice of midwifery.

  15. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  16. The Millennium Villages Project: a retrospective, observational, endline evaluation.

    Science.gov (United States)

    Mitchell, Shira; Gelman, Andrew; Ross, Rebecca; Chen, Joyce; Bari, Sehrish; Huynh, Uyen Kim; Harris, Matthew W; Sachs, Sonia Ehrlich; Stuart, Elizabeth A; Feller, Avi; Makela, Susanna; Zaslavsky, Alan M; McClellan, Lucy; Ohemeng-Dapaah, Seth; Namakula, Patricia; Palm, Cheryl A; Sachs, Jeffrey D

    2018-05-01

    The Millennium Villages Project (MVP) was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs). In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero) and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero). Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the project sites. Total on-site spending decreased from US$132

  17. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  18. JUPITER PROJECT - JOINT UNIVERSAL PARAMETER IDENTIFICATION AND EVALUATION OF RELIABILITY

    Science.gov (United States)

    The JUPITER (Joint Universal Parameter IdenTification and Evaluation of Reliability) project builds on the technology of two widely used codes for sensitivity analysis, data assessment, calibration, and uncertainty analysis of environmental models: PEST and UCODE.

  19. Reliability of early radiographic evaluations for canine hip dysplasia obtained from the standard ventrodorsal radiographic projection

    International Nuclear Information System (INIS)

    Corley, E.A.; Keller, G.G.; Lattimer, J.C.; Ellersieck, M.R.

    1997-01-01

    To determine reliability of preliminary evaluations for canine hip dysplasia (CHD) performed by the Orthopedic Foundation for Animals on dogs between 3 and 18 months of age. Retrospective analysis of data from the Orthopedic Foundation for Animals database. 2,332 Golden Retrievers, Labrador Retrievers, German Shepherd Dogs, and Rottweilers for which preliminary evaluation had been performed between 3 and 18 months of age and for which results of a definitive evaluation performed after 24 months of age were available. Each radiograph was evaluated, and hip joint status was graded as excellent, good, fair, or borderline phenotype or mild, moderate, or severe dysplasia. Preliminary evaluations were performed by 1 radiologist; definitive evaluations were the consensus of 3 radiologists. Reliability of preliminary evaluations was calculated as the percentage of definitive evaluations (normal vs dysplastic) that were unchanged from preliminary evaluations. Reliability of a preliminary evaluation of normal hip joint phenotype decreased significantly as the preliminary evaluation changed from excellent (100%) to good (97.9%) to fair (76.9%) phenotype. Reliability of a preliminary evaluation of CHD increased significantly as the preliminary evaluation changed from mild (84.4%) to moderate (97.4%) CHD. Reliability of preliminary evaluations increased significantly as age at the time of preliminary evaluation increased, regardless of whether dogs received a preliminary evaluation of normal phenotype or CHD. Results suggest that preliminary evaluations of hip joint status in dogs are generally reliable. However, dogs that receive a preliminary evaluation of fair phenotype of mild CHD should be reevaluated after 24 months of age

  20. Energy Utilization Evaluation of Carbon Performance in Public Projects by FAHP and Cloud Model

    Directory of Open Access Journals (Sweden)

    Lin Li

    2016-07-01

    Full Text Available With the low-carbon economy advocated all over the world, how to use energy reasonably and efficiently in public projects has become a major issue. It has brought many open questions, including which method is more reasonable in evaluating the energy utilization of carbon performance in public projects when the evaluation information is fuzzy; whether an indicator system can be constructed; and which indicators have more impact on carbon performance. This article aims to solve these problems. We propose a new carbon performance evaluation system for energy utilization based on project processes (design, construction, and operation. Fuzzy Analytic Hierarchy Process (FAHP is used to accumulate the indicator weights and cloud model is incorporated when the indicator value is fuzzy. Finally, we apply our indicator system to a case study of the Xiangjiang River project in China, which demonstrates the applicability and efficiency of our method.

  1. Standard review plan for applications for sealed source and device evaluations and registrations

    International Nuclear Information System (INIS)

    1996-11-01

    The purpose of this document is to provide the reviewer of a request for a sealed source or device safety evaluation with the information and materials necessary to make a determination that the product is acceptable for licensing purposes. It provides the reviewer with a listing of the applicable regulations and industry standards, policies affecting evaluation and registration, certain administrative procedures to be followed, and information on how to perform the evaluation and write the registration certificate. Standard review plans are prepared for the guidance of the Office of Nuclear Material Safety and Safeguards staff responsible for the review of a sealed source or device application. This document is made available to the public as part of the Commission's policy to inform the nuclear industry and the general public of regulatory procedures and policies. Standard review plans are not substitutes for regulatory guides or the Commission's regulations and compliance with them is not required

  2. Standard review plan for applications for sealed source and device evaluations and registrations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The purpose of this document is to provide the reviewer of a request for a sealed source or device safety evaluation with the information and materials necessary to make a determination that the product is acceptable for licensing purposes. It provides the reviewer with a listing of the applicable regulations and industry standards, policies affecting evaluation and registration, certain administrative procedures to be followed, and information on how to perform the evaluation and write the registration certificate. Standard review plans are prepared for the guidance of the Office of Nuclear Material Safety and Safeguards staff responsible for the review of a sealed source or device application. This document is made available to the public as part of the Commission`s policy to inform the nuclear industry and the general public of regulatory procedures and policies. Standard review plans are not substitutes for regulatory guides or the Commission`s regulations and compliance with them is not required.

  3. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  4. Standard practice for preparing, cleaning, and evaluating corrosion test specimens

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2003-01-01

    1.1 This practice covers suggested procedures for preparing bare, solid metal specimens for tests, for removing corrosion products after the test has been completed, and for evaluating the corrosion damage that has occurred. Emphasis is placed on procedures related to the evaluation of corrosion by mass loss and pitting measurements. (Warning—In many cases the corrosion product on the reactive metals titanium and zirconium is a hard and tightly bonded oxide that defies removal by chemical or ordinary mechanical means. In many such cases, corrosion rates are established by mass gain rather than mass loss.) 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific precautionary statements, see 1 and 7.2.

  5. Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects; TOPICAL

    International Nuclear Information System (INIS)

    Das, S

    2001-01-01

    The purpose of this project is to identify and test methods appropriate for estimating the benefits attributable to research and development (R and D) projects funded by the Automotive Lightweight Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). Funded projects range from basic materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R and D projects were chosen for this pilot evaluation: Low-Cost, Continuous Cast Aluminum Sheet; Advanced Forming Technologies for Aluminum; and Manufacturing of Composite Automotive Structures. These projects were chosen because they represent a range of benefits evaluation situations. The first project resulted in an improved process that may be commercialized. The second project is on going and has two distinct components. The third project has yielded an improved technology that has been commercialized. This completed project also benefited from numerous complementary projects

  6. American Fuel Cell Bus Project Evaluation. Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  7. American Fuel Cell Bus Project Evaluation: Third Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB, which was developed as part of the Federal Transit Administration's (FTA) National Fuel Cell Bus Program, was delivered to SunLine in November 2011 and was put in revenue service in mid-December 2011. Two new AFCBs with an upgraded design were delivered in June/July of 2014 and a third new AFCB was delivered in February 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report covers the performance of the AFCBs from July 2015 through December 2016.

  8. Attractiveness Evaluation of Investment in Wind Energy Projects

    Directory of Open Access Journals (Sweden)

    Paulius Rudzkis

    2012-07-01

    Full Text Available Last decade as prices of fossil energy resources were almost constantly going upwards, increasing flow of investments is directed to renewable energy resources. Development and application of green energy became one of priority objectives in many countries. While in the context of wind energy production Lithuania lags behind the EU average, its potential of wind energy usage has great perspective. In this article using random processes, cost-benefit and financial analysis, attractiveness of investment in wind energy projects is examined. Given the stochastic nature of wind energy and by looking into investment profitableness and risk factors, effectiveness of wind turbine is evaluated. Analysis showed that wind energy projects could be considered as having high profit-to-risk factor and should generate significant interest of investment community.

  9. Project and standardization of piping support and models for strain analysis with the use of a data bank system and scale model

    International Nuclear Information System (INIS)

    Paula Freitas, F.E. de; Vecchi, J.L.; Paula Freitas, M.E. de

    1994-01-01

    The Angra-2 pipe support project is presented, beginning with the selection of a standardized support from the Standard Support Catalogue approved by independent technical authorities, together with the backup to the verification and incorporation of the support in the Scale-Model. (author). 5 refs, 3 tabs

  10. FY 1999 project on the development of new industry support type international standards. Standardization of a testing/evaluation method of biological use fine ceramics; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Seitaiyo fine ceramics no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of standardizing/international standardizing an evaluation method of the characteristics required for biological use fine ceramics, and the FY 1999 results were summed up. In the study of characteristics of biological use fine ceramic materials, it was confirmed that zirconia ceramics are more excellent than alumina ceramics in static strength, repeated loads and fatigue properties in the atmospheric air at room temperature. In the study of the evaluation method of biological affinity, the standardization of the simulated body liquid preparation process was studied, and the simulated body liquid was prepared. To evaluate the bioactivity of biological use fine ceramics without making animal experiments, the simulated body liquid in which the ion concentration was made exactly equal to that of human being was prepared using 2-hydroxyethyl-1-piperazinyl ethane sulfonic acid as buffer. There were seen no changes in ion concentration for four weeks at longest as long as this liquid is kept in airtight container at temperature of 36.5 degrees C or below. The present situation of the standardization of bioceramics was surveyed. (NEDO)

  11. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  12. The impact and applicability of critical experiment evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Brewer, R. [Los Alamos National Lab., NM (United States)

    1997-06-01

    This paper very briefly describes a project to evaluate previously performed critical experiments. The evaluation is intended for use by criticality safety engineers to verify calculations, and may also be used to identify data which need further investigation. The evaluation process is briefly outlined; the accepted benchmark critical experiments will be used as a standard for verification and validation. The end result of the project will be a comprehensive reference document.

  13. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  14. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  15. Alternative Evaluation Designs for Data-Centered Technology-Based Geoscience Education Projects

    Science.gov (United States)

    Zalles, D. R.

    2012-12-01

    This paper will present different strategies for how to evaluate contrasting K-12 geoscience classroom-based interventions with different goals, leveraging the first author's experiences as principal investigator of four NSF and NASA-funded geoscience education projects. Results will also be reported. Each project had its own distinctive features but all had in common the broad goal of bringing to high school classrooms uses of real place-based geospatial data to study the relationships of Earth system phenomena to climate change and sustainability. The first project's goal was to produce templates and exemplars for curriculum and assessment designs around studying contrasting geoscience topics with different data sets and forms of data representation. The project produced a near transfer performance assessment task in which students who studied climate trends in Phoenix turned their attention to climate in Chicago. The evaluation looked at the technical quality of the assessment instrument as measured by inter-rater reliability. It then analyzed the assessment results against student responses to the instructional tasks about Phoenix. The evaluation proved useful in pinpointing areas of student strength and weakness on different inquiry tasks, from simple map interpretation to analysis of contrasting claims about what the data indicate. The goal of the second project was to produce an exemplar curriculum unit that bridges Western science and traditional American Indian ecological knowledge for student learning and skill building about local environmental sustainability issues. The evaluation looked at the extent to which Western and traditional perspectives were incorporated into the design of the curriculum. The curriculum was not constructed with a separate assessment, yet evidence centered design was utilized to extrapolate from the exemplar unit templates for future instructional and assessment tasks around other places, other sustainability problems, and

  16. ENDF/B-VIII.0: The 8th Major Release of the Nuclear Reaction Data Library with CIELO-project Cross Sections, New Standards and Thermal Scattering Data

    Science.gov (United States)

    Brown, D. A.; Chadwick, M. B.; Capote, R.; Kahler, A. C.; Trkov, A.; Herman, M. W.; Sonzogni, A. A.; Danon, Y.; Carlson, A. D.; Dunn, M.; Smith, D. L.; Hale, G. M.; Arbanas, G.; Arcilla, R.; Bates, C. R.; Beck, B.; Becker, B.; Brown, F.; Casperson, R. J.; Conlin, J.; Cullen, D. E.; Descalle, M.-A.; Firestone, R.; Gaines, T.; Guber, K. H.; Hawari, A. I.; Holmes, J.; Johnson, T. D.; Kawano, T.; Kiedrowski, B. C.; Koning, A. J.; Kopecky, S.; Leal, L.; Lestone, J. P.; Lubitz, C.; Márquez Damián, J. I.; Mattoon, C. M.; McCutchan, E. A.; Mughabghab, S.; Navratil, P.; Neudecker, D.; Nobre, G. P. A.; Noguere, G.; Paris, M.; Pigni, M. T.; Plompen, A. J.; Pritychenko, B.; Pronyaev, V. G.; Roubtsov, D.; Rochman, D.; Romano, P.; Schillebeeckx, P.; Simakov, S.; Sin, M.; Sirakov, I.; Sleaford, B.; Sobes, V.; Soukhovitskii, E. S.; Stetcu, I.; Talou, P.; Thompson, I.; van der Marck, S.; Welser-Sherrill, L.; Wiarda, D.; White, M.; Wormald, J. L.; Wright, R. Q.; Zerkle, M.; Žerovnik, G.; Zhu, Y.

    2018-02-01

    We describe the new ENDF/B-VIII.0 evaluated nuclear reaction data library. ENDF/B-VIII.0 fully incorporates the new IAEA standards, includes improved thermal neutron scattering data and uses new evaluated data from the CIELO project for neutron reactions on 1H, 16O, 56Fe, 235U, 238U and 239Pu described in companion papers in the present issue of Nuclear Data Sheets. The evaluations benefit from recent experimental data obtained in the U.S. and Europe, and improvements in theory and simulation. Notable advances include updated evaluated data for light nuclei, structural materials, actinides, fission energy release, prompt fission neutron and γ-ray spectra, thermal neutron scattering data, and charged-particle reactions. Integral validation testing is shown for a wide range of criticality, reaction rate, and neutron transmission benchmarks. In general, integral validation performance of the library is improved relative to the previous ENDF/B-VII.1 library.

  17. ENDF/B-VIII.0: The 8 th Major Release of the Nuclear Reaction Data Library with CIELO-project Cross Sections, New Standards and Thermal Scattering Data

    Energy Technology Data Exchange (ETDEWEB)

    Brown, D. A.; Chadwick, M. B.; Capote, R.; Kahler, A. C.; Trkov, A.; Herman, M. W.; Sonzogni, A. A.; Danon, Y.; Carlson, A. D.; Dunn, M.; Smith, D. L.; Hale, G. M.; Arbanas, G.; Arcilla, R.; Bates, C. R.; Beck, B.; Becker, B.; Brown, F.; Casperson, R. J.; Conlin, J.; Cullen, D. E.; Descalle, M. -A.; Firestone, R.; Gaines, T.; Guber, K. H.; Hawari, A. I.; Holmes, J.; Johnson, T. D.; Kawano, T.; Kiedrowski, B. C.; Koning, A. J.; Kopecky, S.; Leal, L.; Lestone, J. P.; Lubitz, C.; Márquez Damián, J. I.; Mattoon, C. M.; McCutchan, E. A.; Mughabghab, S.; Navratil, P.; Neudecker, D.; Nobre, G. P. A.; Noguere, G.; Paris, M.; Pigni, M. T.; Plompen, A. J.; Pritychenko, B.; Pronyaev, V. G.; Roubtsov, D.; Rochman, D.; Romano, P.; Schillebeeckx, P.; Simakov, S.; Sin, M.; Sirakov, I.; Sleaford, B.; Sobes, V.; Soukhovitskii, E. S.; Stetcu, I.; Talou, P.; Thompson, I.; van der Marck, S.; Welser-Sherrill, L.; Wiarda, D.; White, M.; Wormald, J. L.; Wright, R. Q.; Zerkle, M.; Žerovnik, G.; Zhu, Y.

    2018-02-01

    We describe the new ENDF/B-VIII.0 evaluated nuclear reaction data library. ENDF/B-VIII.0 fully incorporates the new IAEA standards, includes improved thermal neutron scattering data and uses new evaluated data from the CIELO project for neutron reactions on 1H, 16O, 56Fe, 235U, 238U and 239Pu described in companion papers in the present issue of Nuclear Data Sheets. The evaluations benefit from recent experimental data obtained in the U.S. and Europe, and improvements in theory and simulation. Notable advances include updated evaluated data for light nuclei, structural materials, actinides, fission energy release, prompt fission neutron and γ-ray spectra, thermal neutron scattering data, and charged-particle reactions. Integral validation testing is shown for a wide range of criticality, reaction rate, and neutron transmission benchmarks. In general, integral validation performance of the library is improved relative to the previous ENDF/B-VII.1 library.

  18. Annual report of the project CIS-03-95, `evaluation of actinide nuclear data`

    Energy Technology Data Exchange (ETDEWEB)

    Maslov, V.M. [Radiation Physics and Chemistry Problems Inst., Minsk-Sosny (Belarus)

    1997-03-01

    The evaluation of neutron data for {sup 243}Cm, {sup 245}Cm and {sup 246}Cm is made in the energy region from 10-5 eV up to 20 MeV. The results of the evaluation are compiled in the ENDF/B-VI format. This work is performed under the Project Agreement CIS-03-95 with the International Science and Technology Center (Moscow). This is the annual report of the project CIS-03-95. (author)

  19. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  20. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    Science.gov (United States)

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  1. FY 2000 Immediate-effect type project for research and development for international standards supporting information technology industries. Standardization of the testing/evaluation methods for displays for information processing devices; 2000 nendo joho sangyo shien sokkogata kokusai hyojun kaihatsu jigyo seika hokokusho. Joho shori kikiyo display no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of the tests and studies for the methods of testing and evaluating the transparent electroconductive films necessary for production and product evaluation of liquid crystal displays, for their international standardization. The studies are directed to the testing/evaluation methods for internal stresses and adhesion force, surface shapes, and microstructures, and also to surveys on the market/technology trends, and preparation of the international standard drafts, among others. These result in, e.g., development of the quantitative evaluation technologies for internal stresses by the micro-sheet glass method, and surface shapes by atomic force microscopy. The local grain size and orientation are elucidated by transmission electron microscopy, to obtain new knowledge of the microstructures. Various technologies related to adhesion testing/evaluation methods are proposed for ISO/TC206, but it is found none is applicable to transparent electroconductive films. The standard drafts are prepared for standardization of the testing/evaluation methods for internal stresses, adhesion force and surface shapes. (NEDO)

  2. Collaborative International Evaluated Library Organisation Pilot Project. CIELO meeting, NEA Headquarters, 18-20 May 2015

    International Nuclear Information System (INIS)

    Mattoon, Caleb; Brown, David; Trkov, Andrej; Plompen, Arjan; Hawari, Ayman I.; Roubtsov, Danila; Kim, Do Heon; Bauge, Eric; Palmiotti, Giuseppe; Kessedjian, Gregoire; Conlin, Jeremy Lloyd; Qian, Jing; Leal, Luiz Carlos; Chadwick, Mark; Herman, Michal Wladyslaw; White, Morgan C.; Cabellos, Oscar; Romain, Pascal; Schillebeeckx, Peter; Ichou, Raphaelle; Jacqmin, Robert; Hilaire, Stephane; Danon, Yaron; Ge, Zhigang; Malvagi, Fausto; Kahler, Albert C. Skip; Morillon, Benjamin; Mcnabb, Dennis P.; Oleynik, Dmitry S.; Wu, Haicheng; Marquez Damian, Jose Ignacio; Yokoyama, Kenji; Dunn, Michael; Cho, Young-Sik; Pignet, Sophie; Ignatyuk, Anatoly V.; Leeb, Helmut; Wang, Wenming; Ruan, Xichao

    2015-05-01

    WPEC subgroup 40-CIELO (Collaborative International Evaluated Library Organization) provides a new working paradigm to facilitate evaluated nuclear reaction data advances. It brings together experts from across the international nuclear reaction data community to identify and document discrepancies among existing evaluated data libraries, measured data, and model calculation interpretations, and aims to make progress in reconciling these discrepancies to create more accurate ENDF-formatted files. SG40-CIELO focusses on 6 important isotopes: "1H, "1"6O, "5"6Fe, "2"3"5","2"3"8U, "2"3"9Pu. This document is the proceedings of the CIELO meeting, held at the NEA Headquarters on 18-20 May 2015. It comprises all the available presentations (slides) given by the participants: A - CIELO project: - 1: Status of Cross Section Progress (M. Chadwick); - 2: Update on CIELO Related Measurements at RPI (Y. Danon); - 3: IAEA-NDS and the CIELO Project (A. Trkov); - 4: LANL Criticality Data Testing using CIELO Candidate Evaluations (S. Kahler); - 5: ENDF/B-VII.1 vs. CIELO (R. Cullen); B - O"1"6: - 6: n+"1"6O (A. Plompen); - 7: Resonance Evaluations for "1"6O for the CIELO Project (L. Leal); - 8: Validation of Leal and Hale O-16 Evaluations against FNS/JAEA Liquid Oxygen ToF Benchmark (I. Kodeli); - 9: Cierjacks 1968, Cierjacks 1980 and RPI 2015 (C.R. Lubitz); - 10: O"1"6 Items (C.R. Lubitz); C - Fe"5"6: - 11: Iron in fast neutron range, beta-0 evaluation for "5"6Fe (M. Herman); - 12: Data Evaluation at ORNL (L. Leal); - 13: IAEA-NDS and the CIELO Project Fe-56 (A. Trkov); - 14: The evaluation of experimental data in fast range for "5"6Fe (Z. Ge); D - H1 - 15: Reactivity effect of New Light and Heavy Water TSL on Critical Systems (J.I. Marquez); E - Big3: - 16: Resonance Evaluations of "2"3"5U for the CIELO Project (L. Leal); - 17: IAEA-NDS and the CIELO Project U-235 (A. Trkov); - 18: Status of "2"3"5U CIELO evaluation (B. Morillon); - 19: U"2"3"5 Items (C.R. Lubitz); - 20: Fission

  3. Standards and reliability in evaluation: when rules of thumb don't apply.

    Science.gov (United States)

    Norcini, J J

    1999-10-01

    The purpose of this paper is to identify situations in which two rules of thumb in evaluation do not apply. The first rule is that all standards should be absolute. When selection decisions are being made or when classroom tests are given, however, relative standards may be better. The second rule of thumb is that every test should have a reliability of .80 or better. Depending on the circumstances, though, the standard error of measurement, the consistency of pass/fail classifications, and the domain-referenced reliability coefficients may be better indicators of reproducibility.

  4. Core Abilities Evaluation Index System Exploration and Empirical Study on Distributed PV-Generation Projects

    Directory of Open Access Journals (Sweden)

    Lin He

    2017-12-01

    Full Text Available In line with the constraints of environmental problems and economic development, large-scale renewable-generation projects have been planned and constructed in recent years. In order to achieve sustainable power development and improve the power supply structure, China’s government has focused on distributed photovoltaic (PV generation projects due to their advantages of clean emission and local consumption. However, their unstable output power still brings a series of problems concerning reliability, investment income, and available substitution proportion to traditional power, and so on. Therefore, it is imperative to understand the competitive development abilities of distributed PV generation projects and measure them effectively. First, through various investigation methods such as literature reviews, feasibility report analysis and expert interviews, the factors that influence the core abilities of distributed PV-generation projects were explored based on the micro-grid structure. Then, with the indexed exploration results, the factors were classified into 6 dimensions, i.e., investment and earning ability, production and operation ability, power-grid coordination ability, energy-conservation and emission-reduction ability, sustainable development ability, and society-serving ability. Meanwhile, an evaluation index system for core abilities of distributed PV-generation project was constructed using all quantitative indicators. Third, for examining the availability of the evaluation index system, combination weighting and techniques for order preference by similarity to an ideal solution (TOPSIS methods were adopted to assess the practical distributed PV-generation projects. The case study results showed that installed capacity, local economy development, and grid-connected power quantity will influence the core abilities of distributed PV-generation project, obviously. The conclusions of the evaluation analysis on core abilities can

  5. International evaluation of Swedish research projects in the field of short rotation forestry for energy

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, W M [N.I. Horticulture and Plant Breeding Station, Armagh (Ireland); Isebrands, J [USDA Forest Service, North Central Forest Experiment Station, Rhinelander, WI (United States); Namkoong, G [Univ. of British Columbia, Vancouver, BC (Canada). Dept. of Forest Sciences; Tahvanainen, J [Univ. of Joensuu (Finland). Dept. of Biology

    1996-11-01

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme in the field of Short Rotation Forestry for Energy. Thereafter, the 16 projects are evaluated separately

  6. Economic and environmental evaluation of investment projects of biogas plants

    International Nuclear Information System (INIS)

    Guzmán Marrero, Elizabeth; Guzmán Chinea, Jesús Manuel; Mata Varela, Milagros C.; Pérez González, Yanet

    2015-01-01

    The economic evaluation of the implementation and use of renewable energy is an issue of paramount importance and has been approached from different perspectives by different authors in different countries. Biogas technology has its own characteristics that make it more complex analysis involved not only in this case the energy aspect but there is also a significant impact on health assessment difficult, fertilization, soil improvement, animal feed and improved conditions of life. The capital budgeting, in conjunction with the planning process, is a key economic tool for decision making and in turn represents an ongoing challenge for the agricultural sector. It is a necessity of our country, together with the entire world, potentiate the action to correct management of organic waste generated in intensive pig farming, to contribute to the reduction of environmental impacts that this work causes. Studies in this area show the shortcomings that exist in Cuban law established for the evaluation of investment projects, both in its structure and in its cycle, without taking into account important elements such as risk analysis. This research evaluates the economic and financial feasibility of an investment project, including a social and environmental assessment of the same financial justification for the inclusion of risk analysis in the evaluation process (full text)

  7. The Fort McMurray Demonstration Project in Social Marketing: theory, design, and evaluation.

    Science.gov (United States)

    Guidotti, T L; Ford, L; Wheeler, M

    2000-02-01

    The Fort McMurray Demonstration Project in Social Marketing is a multifaceted program that applies the techniques of social marketing to health and safety. This paper describes the origins of the project and the principles on which it was based. VENUE: Fort McMurray, in the province of Alberta, Canada, was selected because the community had several community initiatives already underway and the project had the opportunity to demonstrate "value added." The project is distinguished from others by a model that attempts to achieve mutually reinforcing effects from social marketing in the community as a whole and from workplace safety promotion in particular. Specific interventions sponsored by the project include a media campaign on cable television, public activities in local schools, a community safety audit, and media appearance by a mascot that provides visual identity to the project, a dinosaur named "Safetysaurus." The project integrated its activities with other community initiatives. The evaluation component emphasizes outcome measures. A final evaluation based on injury rates and attitudinal surveys is underway. Baseline data from the first round of surveys have been compiled and published. In 1995, Fort McMurray became the first city in North America to be given membership in the World Health Organization's Safe Community Network.

  8. Radiological Evaluation Standards in the Radiology Department of Shahid Beheshti Hospital (RAH) YASUJ Based on Radiology standards in 92

    OpenAIRE

    A َKalantari; SAM Khosravani

    2014-01-01

    Background & aim: Radiology personnel’s working in terms of performance and safety is one of the most important functions in order to increase the quality and quantity. This study aimed to evaluate the radiological standards in Shahid Beheshti Hospital of Yasuj, Iran, in 2013. Methods: The present cross-sectional study was based on a 118 randomly selected graphs and the ranking list, with full knowledge of the standards in radiology was performed two times. Data were analyzed using descri...

  9. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    Science.gov (United States)

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  10. Evaluation of template-based models in CASP8 with standard measures

    KAUST Repository

    Cozzetto, Domenico; Kryshtafovych, Andriy; Fidelis, Krzysztof; Moult, John; Rost, Burkhard; Tramontano, Anna

    2009-01-01

    The strategy for evaluating template-based models submitted to CASP has continuously evolved from CASP1 to CASP5, leading to a standard procedure that has been used in all subsequent editions. The established approach includes methods

  11. Methodology to evaluate the site standard seismic motion for a nuclear facility

    International Nuclear Information System (INIS)

    Soares, W.A.

    1983-03-01

    An overall view of the subjects involved in the determination of the site standard seismic motion to a nuclear facility is presented. The main topics discussed are: basic priciples of seismic instrumentation; dynamic and spectral concepts; design earthquakes definitions; fundamentals of seismology; empirical curves developed from prior seismic data; avalable methodologies and recommended procedures to evaluate the site standard seismic motion. (E.G.) [pt

  12. Evaluation of the Standard Setting on the 2005 Grade 12 National Assessment of Educational Progress Mathematics Test

    Science.gov (United States)

    Sireci, Stephen G.; Hauger, Jeffrey B.; Wells, Craig S.; Shea, Christine; Zenisky, April L.

    2009-01-01

    The National Assessment Governing Board used a new method to set achievement level standards on the 2005 Grade 12 NAEP Math test. In this article, we summarize our independent evaluation of the process used to set these standards. The evaluation data included observations of the standard-setting meeting, observations of advisory committee meetings…

  13. Evaluated Data Projects at the NEA

    International Nuclear Information System (INIS)

    Henriksson, H.; Rugama, Y.

    2006-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank is part of an international network of data centres in charge of the compilation and dissemination of basic nuclear data. The NEA offers easy access to the main nuclear databases with bibliographical information, evaluated libraries, e.g. the Joint Evaluated Fission and Fusion (JEFF) library, and experimental data in the EXFOR database, comprising published neutron induced as well as charged particle induced nuclear reaction data. The NEA Working Party on international nuclear data Evaluation Co-operation (WPEC) is established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations and validation. WPEC provides a framework for co-operative activities between six major evaluation projects (BROND, CENDL, Endf, FENDL, JEFF and JENDL). The NEA Data Bank administrates the collection and validation as well as the distribution of the JEFF library. The latest version, JEFF-3.1, was released in May 2005 and it contains a neutron data library, a proton data library and thermal scattering law data. The special purpose library on activation data contains 774 nuclei with over 12600 neutron induced reactions. Included is also radioactive decay data, with 3852 isotopes, and spontaneous and neutron induced fission yield data. The full documentation of the library is being prepared for publication in 2006. Processed JEFF-3.1 data files in ACE format, mainly for reactor physics applications, have been prepared and were distributed in spring 2006 with documentation. The processed files have been validated for criticality calculations, as well as for radiation physics application. The detailed analysis of the validation results will be very useful for improving the accuracy of evaluated data libraries. The display program JANIS has been developed at the NEA, and the latest version (JANIS-2.21) was released in October 2005. JANIS is designed to facilitate the visualisation and

  14. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  15. [Outcomes evaluation of the school staff health promotion project].

    Science.gov (United States)

    Woynarowska-Sołdan, Magdalena

    This article presents selected outcomes of a 3-year project "Health promotion of school staff in health-promoting schools," as well as the achievements and difficulties in its implementation. The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62-93%) and the physical and social environment of the school (50-92%). Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2):187-200. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  16. Outcomes evaluation of the school staff health promotion project

    Directory of Open Access Journals (Sweden)

    Magdalena Woynarowska-Sołdan

    2016-04-01

    Full Text Available Background: This article presents selected outcomes of a 3-year project “Health promotion of school staff in health-promoting schools,” as well as the achievements and difficulties in its implementation. Material and Methods: The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Results: Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62–93% and the physical and social environment of the school (50–92%. Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. Conclusions: The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2:187–200

  17. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  18. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  19. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  20. The International Criticality Safety Benchmark Evaluation Project (ICSBEP)

    International Nuclear Information System (INIS)

    Briggs, J.B.

    2003-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in 1992 by the United States Department of Energy. The ICSBEP became an official activity of the Organisation for Economic Cooperation and Development (OECD) - Nuclear Energy Agency (NEA) in 1995. Representatives from the United States, United Kingdom, France, Japan, the Russian Federation, Hungary, Republic of Korea, Slovenia, Yugoslavia, Kazakhstan, Israel, Spain, and Brazil are now participating. The purpose of the ICSBEP is to identify, evaluate, verify, and formally document a comprehensive and internationally peer-reviewed set of criticality safety benchmark data. The work of the ICSBEP is published as an OECD handbook entitled 'International Handbook of Evaluated Criticality Safety Benchmark Experiments.' The 2003 Edition of the Handbook contains benchmark model specifications for 3070 critical or subcritical configurations that are intended for validating computer codes that calculate effective neutron multiplication and for testing basic nuclear data. (author)

  1. Creation of minimum standard tool for palliative care in India and self-evaluation of palliative care programs using it

    Directory of Open Access Journals (Sweden)

    M R Rajagopal

    2014-01-01

    Full Text Available Background: It is important to ensure that minimum standards for palliative care based on available resources are clearly defined and achieved. Aims: (1 Creation of minimum National Standards for Palliative Care for India. (2 Development of a tool for self-evaluation of palliative care organizations. (3 Evaluation of the tool in India. In 2006, Pallium India assembled a working group at the national level to develop minimum standards. The standards were to be evaluated by palliative care services in the country. Materials and Methods: The working group prepared a "standards" document, which had two parts - the first composed of eight "essential" components and the second, 22 "desirable" components. The working group sent the document to 86 hospice and palliative care providers nationwide, requesting them to self-evaluate their palliative care services based on the standards document, on a modified Likert scale. Results: Forty-nine (57% palliative care organizations responded, and their self-evaluation of services based on the standards tool was analyzed. The majority of the palliative care providers met most of the standards identified as essential by the working group. A variable percentage of organizations had satisfied the desirable components of the standards. Conclusions: We demonstrated that the "standards tool" could be applied effectively in practice for self-evaluation of quality of palliative care services.

  2. 75 FR 61413 - Notice of Availability of Biotechnology Quality Management System Audit Standard and Evaluation...

    Science.gov (United States)

    2010-10-05

    ...] Notice of Availability of Biotechnology Quality Management System Audit Standard and Evaluation of... the public that the Animal and Plant Health Inspection Service has developed an audit standard for its biotechnology compliance assistance program. The audit standard, which was made available in draft form for...

  3. FY 1999 project on the development of new industry support type international standards. Standardization of test/evaluation methods of telecommunication use fine ceramics; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Tsushin kikiyo fine ceramics no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As to high frequency/ultra-high frequency band use fine ceramics, the R and D were conducted with the aim of establishing the evaluation method of electric characteristics such as dielectric constants and dielectric losses, and at standardizing and internationally standardizing the principle of the measuring method, preparation method of equipment and test pieces, measuring procedures, etc. The FY 1999 results were summed up. As to the measuring method of electric characteristics, enhancement of measuring accuracy was made for the millimeter wave coaxial exciting cavity resonator method and the Fabry Perot method. Further, field survey was made of the developmental trend of the measuring method in Europe and the U.S. Concerning measuring use standard test pieces, candidate materials were trially manufactured, and the shape/dimension of a part of the candidate materials were determined. As to surface basic properties, effects of surface shape and convex/concave faces of test pieces on characteristic evaluation were studied, and it was made clear that convex/concave faces were greatly influential. In the technical committee, how to proceed with the development was discussed in the first meeting, and evaluation methods and candidate standard substances were selected in the second meeting. (NEDO)

  4. Establishment of quality assessment standard for mammographic equipment: evaluation of phantom and clinical images

    International Nuclear Information System (INIS)

    Lee, Sung Hoon; Choe, Yeon Hyeon; Chung, Soo Young

    2005-01-01

    The purpose of this study was to establish a quality standard for mammographic equipment Korea and to eventually improve mammographic quality in clinics and hospitals throughout Korea by educating technicians and clinic personnel. For the phantom test and on site assessment, we visited 37 sites and examined 43 sets of mammographic equipment. Items that were examined include phantom test, radiation dose measurement, developer assessment, etc. The phantom images were assessed visually and by optical density measurements. For the clinical image assessment, clinical images from 371 sites were examined following the new Korean standard for clinical image evaluation. The items examined include labeling, positioning, contrast, exposure, artifacts, collimation among others. Quality standard of mammographic equipment was satisfied in all equipment on site visits. Average mean glandular dose was 114.9 mRad. All phantom image test scores were over 10 points (average, 10.8 points). However, optical density measurements were below 1.2 in 9 sets of equipment (20.9%). Clinical image evaluation revealed appropriate image quality in 83.5%, while images from non-radiologist clinics were adequate in 74.6% (91/122), which was the lowest score of any group. Images were satisfactory in 59.0% (219/371) based on evaluation by specialists following the new Korean standard for clinical image evaluation. Satisfactory images had a mean score of 81.7 (1 S.D. =8.9) and unsatisfactory images had a mean score of 61.9 (1 S.D = 11). The correlation coefficient between the two observers was 0.93 (ρ < 0.01) in 49 consecutive cases. The results of the phantom tests suggest that optical density measurements should be performed as part of a new quality standard for mammographic equipment. The new clinical evaluation criteria that was used in this study can be implemented with some modifications for future mammography quality control by the Korean government

  5. Geological events in submerged areas: attributes and standards in the EMODnet Geology Project

    Science.gov (United States)

    Fiorentino, A.; Battaglini, L.; D'Angelo, S.

    2017-12-01

    EMODnet Geology is a European Project which promotes the collection and harmonization of marine geological data mapped by various national and regional mapping projects and recovered in the literature, in order to make them freely available through a web portal. Among the several features considered within the Project, "Geological events and probabilities" include submarine landslides, earthquakes, volcanic centers, tsunamis, fluid emissions and Quaternary faults in European Seas. Due to the different geological settings of European sea areas it was necessary to elaborate a comprehensive and detailed pattern of Attributes for the different features in order to represent the diverse characteristics of each occurrence. Datasets consist of shapefiles representing each event at 1:250,000 scale. The elaboration of guidelines to compile the shapefiles and attribute tables was aimed at identifying parameters that should be used to characterize events and any additional relevant information. Particular attention has been devoted to the definition of the Attribute table in order to achieve the best degree of harmonization and standardization according to the European INSPIRE Directive. One of the main objectives is the interoperability of data, in order to offer more complete, error-free and reliable information and to facilitate exchange and re-use of data even between non-homogeneous systems. Metadata and available information collected during the Project is displayed on the Portal (http://www.emodnet-geology.eu/) as polygons, lines and points layers according to their geometry. By combining all these data it might be possible to elaborate additional thematic maps which could support further research as well as land planning and management. A possible application is being experimented by the Geological Survey of Italy - ISPRA which, in cooperation with other Italian institutions contributing to EMODnet Geology, is working at the production of an update for submerged areas

  6. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  7. An analysis of the demonstration projects for renewable energy application buildings in China

    International Nuclear Information System (INIS)

    Liu, Xingmin; Ren, Hong; Wu, Yong; Kong, Deping

    2013-01-01

    During the 2006–2008 period, there were 386 demonstration projects for renewable energy application buildings (REAB) organised by Chinese government, with a total area of approximately 40,420,000 m 2 . By the end of 2011, the vast majority of these projects had been completed and had passed the final acceptance. This paper analyses the measures taken by the Chinese government, including economic incentive mechanisms, organising agencies, application and evaluation systems, online monitoring platforms, acceptance inspections, assessment systems, standard criteria and so forth. This paper then evaluates the policy effects. The paper shows that there has been a satisfactory effect in the development of the REAB market, mobilising the enthusiasm of the government, equipment manufacturers and scientific research institutions, and promoting energy conservation. In addition, this paper analyses the suitability of different technological types in different climatic zones, which provides further guidance for the development of the REAB. Finally, based on the analyses of the problems met in the implementation of the demonstration projects, this paper proposes some policy suggestions concerning standard criteria, technological development, project management, incentive mechanisms and so on, to promote the development of the REAB more effectively in the future in China. - Highlights: • The policy measures to promote the development of renewable energy application buildings in China. • Evaluation of the demonstration policy effects in the market development and other aspects. • Analyses of the regional applicability for renewable energy application buildings in China. • Analyses of problems met in the implementation of the demonstration projects. • Put forward some policy suggestions on standard, technology, management, etc

  8. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  9. Improving Quality Assurance with CDIO Self-Evaluation: Experiences From a Nordic Project

    DEFF Research Database (Denmark)

    Kontio, Juha; Roslöf, Janne; Edström, Kristina

    2012-01-01

    The main goal of the Nordic project Quality Assurance in Higher Education was to develop and implement a self-evaluation model in the participating Higher Education Institutes (HEIs) to support their quality assurance work and continuous curriculum development. Furthermore, the project aimed...... programme and new ideas and support for quality assurance work in other higher education institutes have been produced....

  10. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken

  11. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken. (Author)

  12. Evaluation of the AccessIT Project and the Distance LearningProgramme on Digitization

    Directory of Open Access Journals (Sweden)

    Bülent Yılmaz

    2013-11-01

    Full Text Available AccessIT is an EU-funded project under EU’s Education and Culture Program aiming to digitize a certain amount of sources that are part of the cultural heritage, to transfer them to Europeana, and to sustain the education infrastructure to achieve this goal in the partner countries of Greece, Poland, Serbia, Turkey and UK. In this study, in addition to the general evaluation of the AccessIT Project, it is aimed to investigate the awareness of participants in thefield on digitization and digital content management, their self-efficiency perceptions, and to evaluate the education program based on the data acquired from the survey of544participants who were enrolled in the distance education program offered within the scope of the project.It was found out in the study that the AccessIT Project has had an important function in Turkey and the distance education program significantly contributed to participants ’ self-efficiency perceptions about digitization.

  13. Evaluation of the Standard Ion Transfer Potentials for PVC Plasticized Membranes from Voltammetric Measurements

    Czech Academy of Sciences Publication Activity Database

    Langmaier, Jan; Stejskalová, Květoslava; Samec, Zdeněk

    2001-01-01

    Roč. 496, č. 1 (2001), s. 143-147 ISSN 0022-0728. [Symposium in Kyoto. Kyoto, 02.03.2000] R&D Projects: GA AV ČR IAA4040902 Institutional research plan: CEZ:AV0Z4040901 Keywords : ion voltammetry * PVC plasticized membrane * standard ion transfer potential Subject RIV: CG - Electrochemistry Impact factor: 1.960, year: 2001

  14. International Criticality Safety Benchmark Evaluation Project (ICSBEP) - ICSBEP 2015 Handbook

    International Nuclear Information System (INIS)

    Bess, John D.

    2015-01-01

    The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the United States Department of Energy (DOE). The project quickly became an international effort as scientists from other interested countries became involved. The International Criticality Safety Benchmark Evaluation Project (ICSBEP) became an official activity of the Nuclear Energy Agency (NEA) in 1995. This handbook contains criticality safety benchmark specifications that have been derived from experiments performed at various critical facilities around the world. The benchmark specifications are intended for use by criticality safety engineers to validate calculation techniques used to establish minimum subcritical margins for operations with fissile material and to determine criticality alarm requirements and placement. Many of the specifications are also useful for nuclear data testing. Example calculations are presented; however, these calculations do not constitute a validation of the codes or cross-section data. The evaluated criticality safety benchmark data are given in nine volumes. These volumes span approximately 69000 pages and contain 567 evaluations with benchmark specifications for 4874 critical, near-critical or subcritical configurations, 31 criticality alarm placement/shielding configurations with multiple dose points for each, and 207 configurations that have been categorised as fundamental physics measurements that are relevant to criticality safety applications. New to the handbook are benchmark specifications for neutron activation foil and thermoluminescent dosimeter measurements performed at the SILENE critical assembly in Valduc, France as part of a joint venture in 2010 between the US DOE and the French Alternative Energies and Atomic Energy Commission (CEA). A photograph of this experiment is shown on the front cover. Experiments that are found unacceptable for use as criticality safety benchmark experiments are discussed in these

  15. Comparison of test protocols for standard room/corner tests

    Science.gov (United States)

    R. H. White; M. A. Dietenberger; H. Tran; O. Grexa; L. Richardson; K. Sumathipala; M. Janssens

    1998-01-01

    As part of international efforts to evaluate alternative reaction-to-fire tests, several series of room/comer tests have been conducted. This paper reviews the overall results of related projects in which different test protocols for standard room/corner tests were used. Differences in the test protocols involved two options for the ignition burner scenario and whether...

  16. American National Standard: guidelines for evaluating site-related geotechnical parameters at nuclear power sites

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    This standard presents guidelines for evaluating site-related geotechnical parameters for nuclear power sites. Aspects considered include geology, ground water, foundation engineering, and earthwork engineering. These guidelines identify the basic geotechnical parameters to be considered in site evaluation, and in the design, construction, and performance of foundations and earthwork aspects for nuclear power plants. Also included are tabulations of typical field and laboratory investigative methods useful in identifying geotechnical parameters. Those areas where interrelationships with other standards may exist are indicated

  17. The development of STS payload environmental engineering standards

    Science.gov (United States)

    Bangs, W. F.

    1982-01-01

    The presently reported effort to provide a single set of standards for the design, analysis and testing of Space Transportation System (STS) payloads throughout the NASA organization must be viewed as essentially experimental, since the concept of incorporating the diverse opinions and experiences of several separate field research centers may in retrospect be judged too ambitious or perhaps even naive. While each STS payload may have unique characteristics, and the project should formulate its own criteria for environmental design, testing and evaluation, a reference source document providing coordinated standards is expected to minimize the duplication of effort and limit random divergence of practices among the various NASA payload programs. These standards would provide useful information to all potential STS users, and offer a degree of standardization to STS users outside the NASA organization.

  18. International Reactor Physics Experiment Evaluation (IRPhE) Project. IRPhE Handbook - 2017 edition

    International Nuclear Information System (INIS)

    2017-01-01

    The International Reactor Physics Evaluation (IRPhE) Project was initiated as a pilot in 1999 by the Nuclear Energy Agency (NEA) Nuclear Science Committee (NSC). The project was endorsed as an official activity of the NSC in June 2003. While the NEA co-ordinates and administers the IRPhE Project at the international level, each participating country is responsible for the administration, technical direction and priorities of the project within their respective countries. The information and data included in this handbook are available to NEA member countries, to all contributing countries and to others on a case-by-case basis. The IRPhE Project is patterned after the International Criticality Safety Benchmark Evaluation Project (ICSBEP). It closely co-ordinates with the ICSBEP to avoid duplication of efforts and publication of conflicting information. Some benchmark data are applicable to both nuclear criticality safety and reactor physics technology. Some have already been evaluated and published by the ICSBEP, but have been extended to include other types of measurements in addition to the critical configuration. Through this effort, the IRPhE Project will be able to 1) consolidate and preserve the existing worldwide information base; 2) retrieve lost data; 3) identify areas where more data are needed; 4) draw upon the resources of the international reactor physics community to help fill knowledge gaps; 5) identify discrepancies between calculations and experiments due to deficiencies in reported experimental data, cross-section data, cross-section processing codes and neutronics codes; 6) eliminate a large amount of redundant research and processing of reactor physics experiment data, and 7) improve future experimental planning, execution and reporting. This handbook contains reactor physics benchmark specifications that have been derived from experiments performed at nuclear facilities around the world. The benchmark specifications are intended for use by

  19. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  20. GROWTH OF THE INTERNATIONAL CRITICALITY SAFETY AND REACTOR PHYSICS EXPERIMENT EVALUATION PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; John D. Bess; Jim Gulliford

    2011-09-01

    Since the International Conference on Nuclear Criticality Safety (ICNC) 2007, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and the International Reactor Physics Experiment Evaluation Project (IRPhEP) have continued to expand their efforts and broaden their scope. Eighteen countries participated on the ICSBEP in 2007. Now, there are 20, with recent contributions from Sweden and Argentina. The IRPhEP has also expanded from eight contributing countries in 2007 to 16 in 2011. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Criticality Safety Benchmark Experiments1' have increased from 442 evaluations (38000 pages), containing benchmark specifications for 3955 critical or subcritical configurations to 516 evaluations (nearly 55000 pages), containing benchmark specifications for 4405 critical or subcritical configurations in the 2010 Edition of the ICSBEP Handbook. The contents of the Handbook have also increased from 21 to 24 criticality-alarm-placement/shielding configurations with multiple dose points for each, and from 20 to 200 configurations categorized as fundamental physics measurements relevant to criticality safety applications. Approximately 25 new evaluations and 150 additional configurations are expected to be added to the 2011 edition of the Handbook. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Reactor Physics Benchmark Experiments2' have increased from 16 different experimental series that were performed at 12 different reactor facilities to 53 experimental series that were performed at 30 different reactor facilities in the 2011 edition of the Handbook. Considerable effort has also been made to improve the functionality of the searchable database, DICE (Database for the International Criticality Benchmark Evaluation Project) and verify the accuracy of the data contained therein. DICE will be discussed in separate papers at ICNC 2011. The status of the

  1. Gold-standard evaluation of a folksonomy-based ontology learning model

    Science.gov (United States)

    Djuana, E.

    2018-03-01

    Folksonomy, as one result of collaborative tagging process, has been acknowledged for its potential in improving categorization and searching of web resources. However, folksonomy contains ambiguities such as synonymy and polysemy as well as different abstractions or generality problem. To maximize its potential, some methods for associating tags of folksonomy with semantics and structural relationships have been proposed such as using ontology learning method. This paper evaluates our previous work in ontology learning according to gold-standard evaluation approach in comparison to a notable state-of-the-art work and several baselines. The results show that our method is comparable to the state-of the art work which further validate our approach as has been previously validated using task-based evaluation approach.

  2. Digital subtraction radiographic evaluation of the standardize periapical intraoral radiographs

    International Nuclear Information System (INIS)

    Cho, Bong Hae; Nah, Kyung Soo

    1993-01-01

    The geometrically standardized intraoral radiographs using 5 occlusal registration material were taken serially from immediate, 1 day, 2, 4, 8, 12 and 16 weeks after making the bite blocks. The qualities of those subtracted images were evaluated to check the degree of reproducibility of each impression material. The results were as follows: 1. The standard deviations of the grey scales of the overall subtracted images were 4.9 for Exaflex, 7.2 for Pattern resin, 9.0 for Tooth Shade Acrylic, 12.2 for XCP only, 14.8 for Impregum. 2. The standard deviation of the grey scales of the overall subtracted images were grossly related to those of the localized horizontal line of interest. 3. Exaflex which showed the best subtracted image quality had 15 cases of straight, 14 cases of wave, 1 case of canyon shape. Impregum which showed the worst subtracted image quality had 4 cases of straight, 8 cases of wave, 18 cases of canyon shape respectively.

  3. Performance evaluation of grid-enabled registration algorithms using bronze-standards

    CERN Document Server

    Glatard, T; Montagnat, J

    2006-01-01

    Evaluating registration algorithms is difficult due to the lack of gold standard in most clinical procedures. The bronze standard is a real-data based statistical method providing an alternative registration reference through a computationally intensive image database registration procedure. We propose in this paper an efficient implementation of this method through a grid-interfaced workflow enactor enabling the concurrent processing of hundreds of image registrations in a couple of hours only. The performances of two different grid infrastructures were compared. We computed the accuracy of 4 different rigid registration algorithms on longitudinal MRI images of brain tumors. Results showed an average subvoxel accuracy of 0.4 mm and 0.15 degrees in rotation.

  4. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  5. Report on Evaluation of Tender for the Valentine Iron Ore Project in Uruguay

    International Nuclear Information System (INIS)

    1981-01-01

    This report prepared by Dastur Engineering International GmbH (DEI)Consulting Engineers, Dusseldorf at the instance of United Nations Industrial Development Organization (UNIDO) seeks to present an evaluation of the feasibility study presented by Republica Oriental del Uruguay, Ministerio de Industria y- Energia (Project Authority) by the Brazilian Consortium (comprising Tenenga, Coferraz, Cimetal and Interbras) along with a project BID including financing possibilities. In accordance with the contract requirements, this Draft Final Report is being submitted. Based on the comments to be received on the findings incorporated in this Draft Final Report from UNIDO and Project Authorities in Uruguay, the Final Report will be prepared and submitted to UNIDO in accordance with the time schedule stipulated in the contract between UNIDO and DEI. The aims of the Project are:a) The development objective is the utilisation of the country's natural resources by exploiting the iron ore deposits of Valentines, for iron and steel production. b)The immediate objective is to evaluate the tenders for the execution of a project to undertake the industrial exploitation of the iron or deposits in close co-operation and co-ordination with the Uruguayan authorities.

  6. Standardized evaluation framework for evaluating coronary artery stenosis detection, stenosis quantification and lumen segmentation algorithms in computed tomography angiography.

    Science.gov (United States)

    Kirişli, H A; Schaap, M; Metz, C T; Dharampal, A S; Meijboom, W B; Papadopoulou, S L; Dedic, A; Nieman, K; de Graaf, M A; Meijs, M F L; Cramer, M J; Broersen, A; Cetin, S; Eslami, A; Flórez-Valencia, L; Lor, K L; Matuszewski, B; Melki, I; Mohr, B; Oksüz, I; Shahzad, R; Wang, C; Kitslaar, P H; Unal, G; Katouzian, A; Örkisz, M; Chen, C M; Precioso, F; Najman, L; Masood, S; Ünay, D; van Vliet, L; Moreno, R; Goldenberg, R; Vuçini, E; Krestin, G P; Niessen, W J; van Walsum, T

    2013-12-01

    Though conventional coronary angiography (CCA) has been the standard of reference for diagnosing coronary artery disease in the past decades, computed tomography angiography (CTA) has rapidly emerged, and is nowadays widely used in clinical practice. Here, we introduce a standardized evaluation framework to reliably evaluate and compare the performance of the algorithms devised to detect and quantify the coronary artery stenoses, and to segment the coronary artery lumen in CTA data. The objective of this evaluation framework is to demonstrate the feasibility of dedicated algorithms to: (1) (semi-)automatically detect and quantify stenosis on CTA, in comparison with quantitative coronary angiography (QCA) and CTA consensus reading, and (2) (semi-)automatically segment the coronary lumen on CTA, in comparison with expert's manual annotation. A database consisting of 48 multicenter multivendor cardiac CTA datasets with corresponding reference standards are described and made available. The algorithms from 11 research groups were quantitatively evaluated and compared. The results show that (1) some of the current stenosis detection/quantification algorithms may be used for triage or as a second-reader in clinical practice, and that (2) automatic lumen segmentation is possible with a precision similar to that obtained by experts. The framework is open for new submissions through the website, at http://coronary.bigr.nl/stenoses/. Copyright © 2013 Elsevier B.V. All rights reserved.

  7. THE MODEL OF EXPERT SYSTEM FOR SCIENTIFIC PROJECTS EVALUATION IN HIGHER EDUCATIONAL INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2015-05-01

    Full Text Available There have been proposed the model of the expert system for the assessment of research projects in higher educational institutions, based on estimates of probability. It allows to rank alternative projects and scenarios. The model is implemented through the software "Small expert system." The principle of calculating the probability of approval of research projects, which form the basis of the expert system, is based on Bayes' theorem. Expert system calculates the probability of approval of research projects by Ministry of Science and Education on the basis of the responses to questions about the content of the request for the execution of research projects. Questions are formed on the basis of the criteria by which experts of state authorities evaluate scientific research projects.

  8. Improvement of methods of evaluation of investment projects in the context of import substitution

    Directory of Open Access Journals (Sweden)

    Kuvshinov M.S.

    2017-01-01

    Full Text Available Due to the imposition of sanctions, based more on geopolitical interests, there were additional essential restrictions on sources of external credits, use of import raw materials and technologies, possibilities of attraction to work of the qualified employees which do not have the Russian nationality, participation in the international technology and scientific projects. At similar restrictions of different resources investment decisions are made extremely carefully, and especially careful and reasonable efficiency evaluation of the investments is required. Traditionally used techniques of efficiency evaluation of investment projects not fully consider strategic interests of owners of industrial enterprises and investors. Decrease in risks requires higher quality of project evaluation. In this work the method of multi-level consistently complex integral assessment of investment projects on an indicator of the integral indicator of their efficiency implementing consecutive selection of investment projects from a portfolio on essential indicators of commercial effectiveness, efficiency of production business activities, a financial state and productivity of activity is provided. The developed method of a complex assessment of investment projects is implemented for practical application by the software product allowing to create on the basis of economic-mathematical modeling specific recommendations in economic practice of industrial enterprises during the developing and implementation of investment strategies. The conclusion that for the Russian economy in the conditions of import substitution accounting of all set of interests of investors and owners of the enterprises provides development and implementation of reasonable investment strategies is drawn.

  9. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  10. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  11. Standards and Specifications for Ground Processing of Space Vehicles: From an Aviation-Based Shuttle Project to Global Application

    Science.gov (United States)

    Ingalls, John; Cipolletti, John

    2011-01-01

    and methods are incongruent. Some processing products are still done on paper, some electronic, and many being converted in between. Business systems then are not fully compatible, and paper as well as electronic conversions are time-consuming and costly. NASA and its Shuttle contractors setup rules and systems to handle what has produced over 130 RLV launches, but they have had many challenges. Attempts have been made to apply aviation industry specifications to make the Shuttle more efficient with its ground processing. One efficiency project example was to make a Shuttle Maintenance Manual (SMM) based on the commercial ATA (Air Transport Association of America) Spec 100 for technical publications. This industry standard, along with others, has been a foundation for efficient global MRO of commercial airlines for years. A modified version was also made for some military aircraft. The SMM project found many similarities in Spec 100 which apply to the Shuttle, and room for expansion for space systems/structures not in aircraft. The SMM project team met with the ATA and representatives from NASA's X-33 and X-34 programs to discuss collaboration on a national space standard based on Spec 100. A pilot project was enabled for a subset of Shuttle systems. Full implementation was not yet achieved, X-33 and X-34 were cancelled, and the Shuttles were then designated for retirement. Nonetheless, we can learn from this project how to expand this concept to all space vehicle products. Since then, ATA has joined with ASD (AeroSpace and Defence Industries Association of Europe) and AIA (Aerospace Industries Association) to form a much-enhanced and expanded international specification: Sl000D, International Specification for Technical Publications. It includes air, land, and sea vehicles, missiles, support equipment, ordnance, and communications. It is used by a growing number of countries for commercial and government products. Its modular design is supported by a Common Source

  12. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  13. Project Evaluation and Cash Flow Forecasting by Stochastic Simulation

    Directory of Open Access Journals (Sweden)

    Odd A. Asbjørnsen

    1983-10-01

    Full Text Available The net present value of a discounted cash flow is used to evaluate projects. It is shown that the LaPlace transform of the cash flow time function is particularly useful when the cash flow profiles may be approximately described by ordinary linear differential equations in time. However, real cash flows are stochastic variables due to the stochastic nature of the disturbances during production.

  14. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  15. Analysis and evaluation of the Electronic Health Record standard in China: a comparison with the American national standard ASTM E 1384.

    Science.gov (United States)

    Xu, Wei; Guan, Zhiyu; Cao, Hongxin; Zhang, Haiyan; Lu, Min; Li, Tiejun

    2011-08-01

    To analyze and evaluate the newly issued Electronic Health Record (EHR) Architecture and Data Standard of China (Chinese EHR Standard) and identify areas of improvement for future revisions. We compared the Chinese EHR Standard with the standard of the American Society for Testing and Materials Standard Practice for Content and Structure of Electronic Health Records in the United States (ASTM E 1384 Standard). The comparison comprised two steps: (1) comparing the conformance of the two standards to the international standard: Health Informatics-Requirements for an Electronic Health Record Architecture (ISO/TS 18308), and showing how the architectures of the two standards satisfy or deviate from the ISO requirements and (2) comparing the detailed data structures between the two standards. Of the 124 requirement items in ISO/TS 18308, the Chinese EHR Standard and the ASTM E 1384 Standard conformed to 77 (62.1%) and 111 (89.5%), respectively. The Chinese EHR Standard conformed to 34 of 50 Structure requirements (68.0%), 22 of 24 Process requirements (91.7%), and 21 of 50 Other requirements (42.0%). The ASTM E 1384 Standard conformed to 49 of 50 Structure requirements (98.0%), 23 of 24 Process requirements (95.8%), and 39 of 40 Other requirements (78.0%). Further development of the Chinese EHR Standard should focus on supporting privacy and security mechanism, diverse data types, more generic and extensible lower level data structures, and relational attributes for data elements. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  16. Expedited Permanency Planning: Evaluation of the Kentucky Adoptions Opportunities Project.

    Science.gov (United States)

    Martin, Mavin H.; Barbee, Anita P.; Antle, Becky F.; Sar, Bibhuti

    2002-01-01

    Presents evaluation findings of a 3-year Kentucky Adoptions Opportunities Project. Notes that a majority of children had one or both parents coping with multiple risk factors including mental illness, substance abuse, mental retardation, or family violence. Discusses major barriers to permanency, as well as policy and practice implications in the…

  17. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  18. The importance of standardized observations to evaluate nutritional care quality in the survey process.

    Science.gov (United States)

    Schnelle, John F; Bertrand, Rosanna; Hurd, Donna; White, Alan; Squires, David; Feuerberg, Marvin; Hickey, Kelly; Simmons, Sandra F

    2009-10-01

    Guidelines written for government surveyors who assess nursing home (NH) compliance with federal standards contain instructions to observe the quality of mealtime assistance. However, these instructions are vague and no protocol is provided for surveyors to record observational data. This study compared government survey staff observations of mealtime assistance quality to observations by research staff using a standardized protocol that met basic standards for accurate behavioral measurement. Survey staff used either the observation instructions in the standard survey process or those written for the revised Quality Improvement Survey (QIS). Trained research staff observed mealtime care in 20 NHs in 5 states during the same time period that survey staff evaluated care in the same facilities, although it could not be determined if survey and research staff observed the same residents during the same meals. Ten NHs were evaluated by government surveyors using the QIS survey instructions and 10 NHs were evaluated by surveyors using the standard survey instructions. Research staff observations using a standardized observation protocol identified a higher proportion of residents receiving inadequate feeding assistance during meals relative to survey staff using either the standard or QIS survey instructions. For example, more than 50% of the residents who ate less than half of their meals based on research staff observation were not offered an alternative to the served meal, and the lack of alternatives, or meal substitutions, was common in all 20 NHs. In comparison, the QIS survey teams documented only 2 instances when meal substitutes were not offered in 10 NHs and the standard survey teams documented no instances in 10 NHs. Standardized mealtime observations by research staff revealed feeding assistance care quality issues in all 20 study NHs. Surveyors following the instructions in either the standard or revised QIS surveys did not detect most of these care quality

  19. Steep cut slope composting : field trials and evaluation : project summary report.

    Science.gov (United States)

    2011-04-01

    This project is a continuation of earlier work performed by Montana State University (Jennings et al. 2007) evaluating compost application on, and incorporation into, soils on steep cut slopes for the Montana Department of Transportation (MDT). The e...

  20. The first technical report for the improvement of R and D evaluation : Focusing on the evaluation reaction of R and D project investigator

    Energy Technology Data Exchange (ETDEWEB)

    Yeo, Ji Won; Kim, I.C.; Won, B.C.; Kim, M.R. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1997-12-01

    The main objectives of this report are as follows. - Measuring the project manager's reaction on R and D evaluation and determining its influencing factors. - Testing the relationship between personal characteristics (tolence for ambiguity, risk-taking propensity, self-efficacy, Turn-over intention) and the outcome of Project Evaluation. - Presenting the useful information related to rebuilding a R and D Evaluation System of KAERI (Korea Atomic Energy Research Institute). 72 refs., 6 figs., 41 tabs. (Author)

  1. On certain development aspects of an ipsas-based system-target approach to evaluation of net asset sustainability level projects in high-rise construction

    Directory of Open Access Journals (Sweden)

    Kazaryan Ruben

    2018-01-01

    Full Text Available Problems of accounting and reporting of net assets and the procedure of their formation taking into account the specifics of the economic and legal status of property of a non-commercial autonomous institution are some of the most controversial in the accounting for entities of the public sector. The study focuses on justification of accounting rules for net assets of public sector entities. The methods used in the study are as follows: comparison, synthesis, analysis, logical approach, and system approach. The article examines legal aspects and specifics of recognition of assets of public sector entities in accordance with IPSAS standards (International Public Sector Accounting Standards are a set of accounting standards issued by IPSASB (Council for International Financial Reporting Standards for Public Sector Organizations used by state-owned enterprises worldwide in preparation of financial statements as of the 31st of August, 2015. The most crucial factor in the modeling of key performance indicators of the system-target approach to estimation of the sustainability level of net assets on the basis of IPSAS is a multicriterial evaluation of the basic management strategy for quality system elements used in operational and strategic planning projects operations in high-rise construction. We offer an alternative evaluation of assets due to be returned to the right holder (the state controller in the event of liquidation of a public sector entity.

  2. On certain development aspects of an ipsas-based system-target approach to evaluation of net asset sustainability level projects in high-rise construction

    Science.gov (United States)

    Kazaryan, Ruben

    2018-03-01

    Problems of accounting and reporting of net assets and the procedure of their formation taking into account the specifics of the economic and legal status of property of a non-commercial autonomous institution are some of the most controversial in the accounting for entities of the public sector. The study focuses on justification of accounting rules for net assets of public sector entities. The methods used in the study are as follows: comparison, synthesis, analysis, logical approach, and system approach. The article examines legal aspects and specifics of recognition of assets of public sector entities in accordance with IPSAS standards (International Public Sector Accounting Standards are a set of accounting standards issued by IPSASB (Council for International Financial Reporting Standards for Public Sector Organizations) used by state-owned enterprises worldwide in preparation of financial statements as of the 31st of August, 2015. The most crucial factor in the modeling of key performance indicators of the system-target approach to estimation of the sustainability level of net assets on the basis of IPSAS is a multicriterial evaluation of the basic management strategy for quality system elements used in operational and strategic planning projects operations in high-rise construction. We offer an alternative evaluation of assets due to be returned to the right holder (the state controller) in the event of liquidation of a public sector entity.

  3. Long-Term Evaluation of SSL Field Performance in Select Interior Projects

    Energy Technology Data Exchange (ETDEWEB)

    Perrin, Tess E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-02-28

    This GATEWAY project evaluated four field installations to better understand the long-term performance of a number of LED products, which can hopefully stimulate improvements in designing, manufacturing, specifying, procuring, and installing LED products. Field studies provide the opportunity to discover and investigate issues that cannot be simulated or uncovered in a laboratory, but the installed performance over time of commercially available LED products has not been well documented. Improving long-term performance can provide both direct energy savings by reducing the need to over-light to account for light loss and indirect energy savings through better market penetration due to SSL’s competitive advantages over less-efficient light source technologies. The projects evaluated for this report illustrate that SSL use is often motivated by advantages other than energy savings, including maintenance savings, easier integration with control systems, and improved lighting quality.

  4. Evaluation of the Project Management Competences Based on the Semantic Networks

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta BODEA

    2008-01-01

    Full Text Available The paper presents the testing and evaluation facilities of the SinPers system. The SinPers is a web based learning environment in project management, capable of building and conducting a complete and personalized training cycle, from the definition of the learning objectives to the assessment of the learning results for each learner. The testing and evaluation facilities of SinPers system are based on the ontological approach. The educational ontology is mapped on a semantic network. Further, the semantic network is projected into a concept space graph. The semantic computability of the concept space graph is used to design the tests. The paper focuses on the applicability of the system in the certification, for the knowledge assessment, related to each element of competence. The semantic computability is used for differentiating between different certification levels.

  5. Vascular diameter measurement in CT angiography: comparison of model-based iterative reconstruction and standard filtered back projection algorithms in vitro.

    Science.gov (United States)

    Suzuki, Shigeru; Machida, Haruhiko; Tanaka, Isao; Ueno, Eiko

    2013-03-01

    The purpose of this study was to evaluate the performance of model-based iterative reconstruction (MBIR) in measurement of the inner diameter of models of blood vessels and compare performance between MBIR and a standard filtered back projection (FBP) algorithm. Vascular models with wall thicknesses of 0.5, 1.0, and 1.5 mm were scanned with a 64-MDCT unit and densities of contrast material yielding 275, 396, and 542 HU. Images were reconstructed images by MBIR and FBP, and the mean diameter of each model vessel was measured by software automation. Twenty separate measurements were repeated for each vessel, and variance among the repeated measures was analyzed for determination of measurement error. For all nine model vessels, CT attenuation profiles were compared along a line passing through the luminal center on axial images reconstructed with FBP and MBIR, and the 10-90% edge rise distances at the boundary between the vascular wall and the lumen were evaluated. For images reconstructed with FBP, measurement errors were smallest for models with 1.5-mm wall thickness, except those filled with 275-HU contrast material, and errors grew as the density of the contrast material decreased. Measurement errors with MBIR were comparable to or less than those with FBP. In CT attenuation profiles of images reconstructed with MBIR, the 10-90% edge rise distances at the boundary between the lumen and vascular wall were relatively short for each vascular model compared with those of the profile curves of FBP images. MBIR is better than standard FBP for reducing reconstruction blur and improving the accuracy of diameter measurement at CT angiography.

  6. Standardized evaluation of accident victims: demands on diagnostic trauma

    International Nuclear Information System (INIS)

    Kanz, K.G.; Mutschler, W.; Linsenmaier, U.; Pfeifer, K.J.

    2002-01-01

    Introduction. Evaluation of trauma systems requires a complete and exact injury classification. The purpose of this study was the introduction of the Abbreviated injury scale (AIS) for radiological trauma scoring. The development of these easy to use coding tools is essential for prompt quality management of trauma.Material and methods. Standardized radiological injury description using a modified Abbreviated injury scale in combination with a Microsoft Excel trademark spreadsheet allows an immediate calculation of the probability of survival according to TRISS methodology.Results. Computed tomography is the main instrument for injury scoring in trauma care. Postmortem scanning provides a direct feedback for trauma teams especially in cases when autopsy is not possible.Conclusion. Computed tomography enables in combination with a standardized injury description exact trauma scoring. Quality management of trauma care depends on a valid and reliable calculation of the probability of survival using TRISS. (orig.) [de

  7. Fiscal 2000 project for development of international standards for supporting novel industries. Standardization of methods for evaluating high-temperature physical properties of new glass; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo. New garasu koonbussei no hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Research and development is under way about methods for evaluating the physical properties of high-temperature glass melt for the development of the methods into international standards. In this fiscal year, a technique of measuring high-temperature physical properties of amino silicate glass melt was developed, and the techniques of measuring high-temperature physical properties of molten soda lime glass and borate-silicate glass were improved. As the result, evaluation techniques compatible with international standards were developed for high-temperature glass melt physical properties such as viscosity, density, coefficient of volume expansion, surface tension, specific heat, thermal conductivity, electric conductivity, oxidation/reduction potentials, and the structure of molten glass. Techniques of evaluating gas solubility and the coefficient of gas diffusion, however, need further basic research and development. The author took part in a round robin test relating to the measurement of glass melt density and heat conductivity at CG/TC18, and measured the said two properties. The result of the round robin test was discussed at TC18 held in Amsterdam in May this year. (NEDO)

  8. Fuzzy system for risk analysis in software projects through the attributes of quality standards iso 25000

    Directory of Open Access Journals (Sweden)

    Chau Sen Shia

    2014-02-01

    Full Text Available With the growth in demand for products and services in the IT area, companies encounter difficulties in establishing a metric or measure of quality of services to address measurably qualitative values in their planning. In this work fuzzy logic, standard SQuaRE (measurement of the quality of software products, Likertscale, GQM method (Goal-Question-Metric -indicator of quality of Software and the project risk analysis model of Boehm were used to assess the quality of services and decision-making, according to your demand and requests for software development. With the aim of improving the quality in the provision of services, the application is used to integrate the team and follow the life cycle of a project from its initial phase, and to assist in the comparison with the proposed schedule during the requirements elicitation.

  9. DOE technical standards list: Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    This Department of Energy (DOE) technical standards list (TSL) has been prepared by the Office of Nuclear Safety Policy and Standards (EH-31) on the basis of currently available technical information. Periodic updates of this TSL will be issued as additional information is received on standardization documents being issued, adopted, or canceled by DOE. This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listings of current DOE technical standards, non-Government standards that have been adopted by DOE, other standards-related documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  10. Evaluation of the RAIN project

    International Nuclear Information System (INIS)

    Stuanes, A.; Dickson, W.; Jenkins, A.; Rasmussen, L.; Stordal, F.

    1991-11-01

    This report presents a scientific assessment of the RAIN project. It describes the main hypotheses tested and the applied methods. The major results of the research are highlighted and discussed, and they are placed in the perspective of national and international acid rain research. An important part of the RAIN project has been to provide information to the public about the acid rain problem, and in this way it has performed an important background role in influencing political decisions and legislation. The RAIN project is regarded as a cost effective research effort, and the novel approach and capital investment will enable further manipulation studies at these sites in the future. It is recommended that the project is continued in the immediate future, with some modification to answer specific questions resulting from the collected data. 24 refs., 6 figs., 1 tab

  11. Importance of standardization in magnetic resonance imaging evaluation of multiple sclerosis

    International Nuclear Information System (INIS)

    Gheuens, J.; Van de Vyver, F.L.; Truyen, L.; Parizel, P.M.; Degryse, H.R.; Peersman, G.V.; De Schepper, A.M.; Martin, J.-J.

    1989-01-01

    Two different MR-procedures for evaluation of MS have been compared. It was found that an extensive and standardized MR-protocol that included parasagittal with intermediate TR as well as axial images with long TR, offered improved sensitivity, better evaluation of the intracranial infratentorial compartment and the cervical part of the spinal cord, and better correlation between clinical disability and MR results. Preliminary results of serial MR in a small group of MS patients are also reported. (author). 6 refs.; 2 figs.; 2 tabs

  12. Radiation-protection standards and waste management

    International Nuclear Information System (INIS)

    Rowe, W.D.

    1976-01-01

    This paper reviews some of the difficult questions to be addressed in the development of fundamental environmental criteria and standards for radioactive waste management. A short discussion is included of the need to develop more precise definitions of terminology, better conceptualization of long-term problems, and new concepts to express risks from waste management and to evaluate the ability of proposed technical alternatives to control such risks. EPA's plans to develop fundamental environmental criteria and generally applicable environmental radiation-protection standards for waste disposal are summarized. Finally, the principal projects in EPA's planned near-future programs are reviewed in the areas of high-level waste, transuranic solid waste, low-level waste, residual decommissioning waste, ocean disposal, and wastes containing natural radioactivity

  13. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  14. Research on evaluating water resource resilience based on projection pursuit classification model

    Science.gov (United States)

    Liu, Dong; Zhao, Dan; Liang, Xu; Wu, Qiuchen

    2016-03-01

    Water is a fundamental natural resource while agriculture water guarantees the grain output, which shows that the utilization and management of water resource have a significant practical meaning. Regional agricultural water resource system features with unpredictable, self-organization, and non-linear which lays a certain difficulty on the evaluation of regional agriculture water resource resilience. The current research on water resource resilience remains to focus on qualitative analysis and the quantitative analysis is still in the primary stage, thus, according to the above issues, projection pursuit classification model is brought forward. With the help of artificial fish-swarm algorithm (AFSA), it optimizes the projection index function, seeks for the optimal projection direction, and improves AFSA with the application of self-adaptive artificial fish step and crowding factor. Taking Hongxinglong Administration of Heilongjiang as the research base and on the basis of improving AFSA, it established the evaluation of projection pursuit classification model to agriculture water resource system resilience besides the proceeding analysis of projection pursuit classification model on accelerating genetic algorithm. The research shows that the water resource resilience of Hongxinglong is the best than Raohe Farm, and the last 597 Farm. And the further analysis shows that the key driving factors influencing agricultural water resource resilience are precipitation and agriculture water consumption. The research result reveals the restoring situation of the local water resource system, providing foundation for agriculture water resource management.

  15. Methodology to evaluate the site standard seismic motion to a nuclear facility

    International Nuclear Information System (INIS)

    Soares, W.A.

    1983-01-01

    For the seismic design of nuclear facilities, the input motion is normally defined by the predicted maximum ground horizontal acceleration and the free field ground response spectrum. This spectrum is computed on the basis of records of strong motion earthquakes. The pair maximum acceleration-response spectrum is called the site standard seismic motion. An overall view of the subjects involved in the determination of the site standard seismic motion to a nuclear facility is presented. The main topics discussed are: basic principles of seismic instrumentation; dynamic and spectral concepts; design earthquakes definitions; fundamentals of seismology; empirical curves developed from prior seismic data; available methodologies and recommended procedures to evaluate the site standard seismic motion. (Author) [pt

  16. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    Science.gov (United States)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  17. Standardized evaluation of lung congestion during COPD exacerbation better identifies patients at risk of dying

    Directory of Open Access Journals (Sweden)

    Høiseth AD

    2013-12-01

    Full Text Available Arne Didrik Høiseth,1 Torbjørn Omland,1 Bo Daniel Karlsson,2 Pål H Brekke,1 Vidar Søyseth11Cardiothoracic Research Group, Division of Medicine, Akershus University Hospital and Institute of Clinical Medicine, University of Oslo, Oslo, Norway; 2Deptartment of Radiology, Akershus University Hospital, Lørenskog, NorwayBackground: Congestive heart failure is underdiagnosed in patients with chronic obstructive pulmonary disease (COPD. Pulmonary congestion on chest radiograph at admission for acute exacerbation of COPD (AECOPD is associated with an increased risk of mortality. A standardized evaluation of chest radiographs may enhance prognostic accuracy.Purpose: We aimed to evaluate whether a standardized, liberal assessment of pulmonary congestion is superior to the routine assessment in identifying patients at increased risk of long-term mortality, and to investigate the association of heart failure with N-terminal prohormone of brain natriuretic peptide (NT-proBNP concentrations.Material and methods: This was a prospective cohort study of 99 patients admitted for AECOPD. Chest radiographs obtained on admission were routinely evaluated and then later evaluated by blinded investigators using a standardized protocol looking for Kerley B lines, enlarged vessels in the lung apex, perihilar cuffing, peribronchial haze, and interstitial or alveolar edema, defining the presence of pulmonary congestion. Adjusted associations with long-term mortality and NT-proBNP concentration were calculated.Results: The standardized assessment was positive for pulmonary congestion in 32 of the 195 radiographs (16% ruled negative in the routine assessment. The standardized assessment was superior in predicting death during a median follow up of 1.9 years (P=0.022, and in multivariable analysis, only the standardized assessment showed a significant association with mortality (hazard ratio 2.4, 95% confidence interval [CI] 1.2–4.7 (P=0.016 and NT-proBNP (relative

  18. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  19. Anatomy of isolated monopole in Abelian projection od SU(2) lattice gauge theory

    CERN Document Server

    Belavin, V A; Veselov, A I

    2001-01-01

    The structure of the isolated static monopolies in the maximum Abelian projection of the SU(2) gluodynamics on the lattice studied. The standard parametrization of the coupling matrix was used by determining the maximum Abelian projection of the R functional maximization relative to all scale transformations. The monopole radius R approx = 0.06 fm is evaluated

  20. Analysis of energy consumption, indoor climate, occupant satisfaction and overall evaluation of the project

    DEFF Research Database (Denmark)

    Zanghirella, Fabio; Thomsen, Kirsten Engelund; Knudsen, Henrik Nellemose

    . Deliverable 23 Deliverable 23 is a deliverable produced as part of the final reporting of the project. It is meant to provide an overview of energy consumption analysis, indoor climate and occupants satisfaction investigations and an overall evaluation of the project. The distribution is public....

  1. Evaluation model for enterprise standardization programs: the case of Petrobras Transporte's marine terminals unit

    Energy Technology Data Exchange (ETDEWEB)

    Maldonado, Luciano; De Ludovico Almeida, Maria Fatima; Penchino Pereira, Paulo Penchina; Santos, Ubirajara; Henrique Ferreira, Manoel; Muller, Gabriela [Petrobras Transporte - Transpetro (Brazil)

    2010-07-01

    With the economic opening and the globalization process, standardization, metrology and quality activities have become known among companies as knowledge areas with direct impact on their search for operational excellence and competitiveness. Petrobras Transporte's Marine Terminal Units has been working over the last years to be recognized as a reference in the activities it pursues. This is based on the Petrobras Transporte's strategic plan 2020, which foresees amongst others, the specialization of technical workforce, operational safety excellence, capital discipline, customer satisfaction, the search for new technologies and markets and the rendering of new services. To achieve these goals, the Marine Terminals Standardization Program must be adhered to. Since that program was launched in 2004, the need for an evaluation model to evaluate its implementation progress, measure the degree of standards compliance and its potential economic, social and environmental impacts have become evident. This paper describes the innovative evaluation model applied to Petrobras Transporte's marine terminals standardization program.

  2. Regional Development and Management of Sunk Capital: Some Issues in Project Evaluation

    OpenAIRE

    Gyles, Oliver

    1995-01-01

    Government intervention aimed at regional development can be justified where there are opportunities for profitable investement of public funds. Benefit: cost analysis can be an effective tool for economic evaluation of regional development project proposals, providcd the distinction between sunk costs and historical outlays is recognised. Because the cost of previous development is sunk, it is appropriate to value existing assets at their opportunity cost. In terms or ex ante project apprais...

  3. Commercial Discount Rate Estimation for Efficiency Standards Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, K. Sydny [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-04-13

    Underlying each of the Department of Energy's (DOE's) federal appliance and equipment standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). A proposed standard is considered economically justified when its benefits exceed its burdens, as represented by the projected net present value of costs and benefits. DOE performs multiple analyses to evaluate the balance of costs and benefits of commercial appliance and equipment e efficiency standards, at the national and individual building or business level, each framed to capture different nuances of the complex impact of standards on the commercial end user population. The Life-Cycle Cost (LCC) analysis models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample in order to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels.1 Thus, the choice of commercial discount rate value(s) used to calculate the present value of energy cost savings within the Life-Cycle Cost model implicitly plays a key role in estimating the economic impact of potential standard levels.2 This report is intended to provide a more in-depth discussion of the commercial discount rate estimation process than can be readily included in standard rulemaking Technical Support Documents (TSDs).

  4. Standard protocol for conducting pre-operational environmental surveillance around nuclear facilities

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rajan, M.P.

    2009-02-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for conducting pre-operational environmental surveillance around nuclear facilities. Such surveillances have been proposed to be carried out by university professionals under DAE-BRNS projects. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  5. Standard protocol for conducting pre-operational environmental surveillance around nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hegde, A G; Verma, P C; Rajan, M P [Health Safety and Environment Group, Bhabha Atomic Research Centre, Mumbai (India)

    2009-02-15

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for conducting pre-operational environmental surveillance around nuclear facilities. Such surveillances have been proposed to be carried out by university professionals under DAE-BRNS projects. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  6. "Heidelberg standard examination" and "Heidelberg standard procedures" - Development of faculty-wide standards for physical examination techniques and clinical procedures in undergraduate medical education.

    Science.gov (United States)

    Nikendei, C; Ganschow, P; Groener, J B; Huwendiek, S; Köchel, A; Köhl-Hackert, N; Pjontek, R; Rodrian, J; Scheibe, F; Stadler, A-K; Steiner, T; Stiepak, J; Tabatabai, J; Utz, A; Kadmon, M

    2016-01-01

    The competent physical examination of patients and the safe and professional implementation of clinical procedures constitute essential components of medical practice in nearly all areas of medicine. The central objective of the projects "Heidelberg standard examination" and "Heidelberg standard procedures", which were initiated by students, was to establish uniform interdisciplinary standards for physical examination and clinical procedures, and to distribute them in coordination with all clinical disciplines at the Heidelberg University Hospital. The presented project report illuminates the background of the initiative and its methodological implementation. Moreover, it describes the multimedia documentation in the form of pocketbooks and a multimedia internet-based platform, as well as the integration into the curriculum. The project presentation aims to provide orientation and action guidelines to facilitate similar processes in other faculties.

  7. IAEA nuclear data for applications: Cross section standards and the reference input parameter library (RIPL)

    International Nuclear Information System (INIS)

    Capote Noy, Roberto; Nichols, Alan L.; Pronyaev, Vladimir G.

    2003-01-01

    An integral part of the activities of the IAEA Nuclear Data Section involves the development of nuclear data for a wide range of user applications. When considering low-energy nuclear reactions induced by neutrons, photons and charged particles, a detailed knowledge is required of the production cross sections over a wide energy range, spectra of emitted particles and their angular distributions. Two highly relevant IAEA data development projects are considered in this paper. Neutron reaction cross-section standards represent the basic quantities needed in nuclear reaction cross-section measurements and evaluations. These standards and the covariance matrices of their uncertainties were previously evaluated and released in 1987. However, the derived uncertainties were subsequently considered to be unrealistic low due to the effect of the low uncertainties obtained in fitting the light element standards to the R-matrix model; as a result, evaluators were forced to scale up the uncertainties to 'expected values'. An IAEA Coordinated Research Project (CRP) entitled 'Improvement of the Standard Cross Sections for Light Elements' was initiated in 2002 to improve the evaluation methodology for the covariance matrix of uncertainty in the R-matrix model fits, and to produce R-matrix evaluations of the important light element standards. The scope of this CRP has been substantially extended to include the preparation of a full set of evaluated standard reactions and covariance matrices of their uncertainties. While almost all requests for nuclear data were originally addressed through measurement programmes, our theoretical understanding of nuclear phenomena has reached a reasonable degree of reliability and nuclear modeling has become standard practice in nuclear data evaluations (with measurements remaining crucial for data testing and benchmarking). Since nuclear model codes require a considerable amount of numerical input, the IAEA has instigated extensive efforts to

  8. Economic evaluation of environmental impacts of open cast mining project - an approach

    International Nuclear Information System (INIS)

    Maiti, S.K.; Pathak, K.

    1998-01-01

    Economic valuation of environmental attributes are pragmatic approach to evaluating the impacts and it helps decision makers to arrive at objective decisions on the basis of cost benefit ratio. For determining the physical impact and its quantification, four evaluation methods, namely-market price method, surrogate market price, survey based and cost based approaches are generally used. The present paper reviews the importance of environmental evaluation of impacts of mining and also reviews a few suitable methodologies that could be effectively used for economic evaluation of environmental impacts in open cast mining projects. (author)

  9. Project monitoring and evaluation: an enhancing method for health research system management

    Directory of Open Access Journals (Sweden)

    Shirin Djalalinia

    2014-01-01

    Conclusions: We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  10. Effectiveness evaluation of the R&D projects in organizations financed by the budget expenses

    Science.gov (United States)

    Yakovlev, D.; Yushkov, E.; Pryakhin, A.; Bogatyreova, M.

    2017-01-01

    The issues of R&D project performance and their prospects are closely concerned with knowledge management. In the initial stages of the project development, it is the quality of the project evaluation that is crucial for the result and generation of future knowledge. Currently there does not exist any common methodology for the evaluation of new R&D financed by the budget. Suffice it to say, the assessment of scientific and technical projects (ST projects) varies greatly depending on the type of customer - government or business structures. An extensive methodological groundwork was formed with respect to orders placed by business structures. It included “an internal administrative order” by the company management for the results of STA intended for its own ST divisions. Regretfully this is not the case with state orders in the field of STA although the issue requires state regulation and official methodological support. The article is devoted to methodological assessment of scientific and technical effectiveness of studies performed at the expense of budget funds, and suggests a new concept based on the definition of the cost-effectiveness index. Thus, the study reveals it necessary to extend the previous approach to projects of different levels - micro-, meso-, macro projects. The preliminary results of the research show that there must be a common methodological approach to underpin the financing of projects under government contracts within the framework of budget financing and stock financing. This should be developed as general guidelines as well as recommendations that reflect specific sectors of the public sector, various project levels and forms of financing, as well as different stages of project life cycle.

  11. FY 1999 project on the development of new industry support type international standards. Standardization of evaluation method of the genetic testing system; 1999 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Aiming at applying standards as international standards, an experimental study was conducted on the standardization of the genetic testing system in Japan and abroad. The FY 1999 results were summarized. As to the unification of testing data processing, analysis of the present state and experimental study were made on the following: sampling method for appropriate testing, selection of anti-coagulants, method to preserve specimens, method to transport them, description of clinical observations in test request paper, method to evaluate performance of test reagents including restriction enzyme, temperature calibration method for equipment, sterilization method, incineration method of specimens, long-term storage of DNA samples, etc. The results were proposed as standard operation procedures after study/discussion at the comprehensive survey committee. Concerning the setting of criteria values in data analysis and the standardization of report form, survey/study were conducted also on ethical/legal/social problems from an aspect of privacy protection of patients. As a result, a total system from the reception of genetic testing to the report making was prepared. (NEDO)

  12. A modification of projective spacetime by finite self-interaction models of virtual leptons and quarks and the electroweak GWS standard model

    International Nuclear Information System (INIS)

    Scheurich, H.

    1986-01-01

    From the projective Dirac equation in a six-dimensional Kleinian space R(3, 3) are derived finite-rotation-group models as self-interaction models of virtual leptons and quarks. The quaternion group underlying them is considered as a substructure group of projective spacetime. A finite hyperspherical carrier of the self-interaction models is embedded into projective spacetime by means of the Planck length L 0 = (hG/c 3 )/sup 1/2/ as a physical unit length. The corresponding modification of metrics in the Planck domain becomes apparent to be equivalent to the role of the Higgs field in the electroweak GWS standard model. (author)

  13. Meeting the government renewable portfolio standard requirements

    International Nuclear Information System (INIS)

    Crawley, M.

    2004-01-01

    This Power Point presentation reviewed renewable portfolio standards (RPSs) from the perspective of AIM PowerGen Corp, an Ontario based wind power development company. Details of AIM's wind projects and wind projects development team were presented and details of the Erie Shores Wind Farm were discussed. New power supply needs in Ontario were evaluated, and challenges with the current energy mix were examined. It was noted that Ontario has significant low-cost, large-scale hydro assets and proven private sector nuclear operational success, as well as an aging transmission system connecting coal-fired assets. Wind, hydro and natural gas generation options were reviewed. Details of Ontario's objectives for enabling renewable energy sources were presented. Challenges with 2007 deadlines, European feed-in tariffs and negotiated contracts were discussed. The Federal government's role in stimulating resource and energy sectors was evaluated. Renewable energy policies were discussed, including the recent wind power production incentive (WPPI) expansion. It was recommended that Ontario stick with current targets and move quickly to the next procurement phase. A review of targets based on the success of earlier projects was recommended. tabs., figs

  14. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    Science.gov (United States)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  15. Economic competitiveness gap related to the application of the GAEC standards of cross-compliance on farms: evaluation methodology

    Directory of Open Access Journals (Sweden)

    Marco Fedrizzi

    2015-12-01

    Full Text Available This paper describes the methods used in the monitoring carried out in the farms of the MO.NA.CO. project, to calculate the economic competitiveness gap faced by agricultural holdings that accede to the commitments imposed by the standards included in the project. The monitoring works were performed in agricultural holdings in relation to the particular reference condition of each standard. The processing of the information acquired allowed us to define the working times of each cultivation operation by means of the indications in the recommendations of the Associazione Italiana di Genio Rurale - Italian Rural Engineering Association, that considers the official methodology of the International Commission of the Organisation Scientifique du Travail en Agriculture (C.I.O.S.T.A.. The overall costs and revenues in case of compliance or non-compliance with the commitments of the standard were calculated by using Biondi’s methodology and other norms that indicate the technical and economic coefficients to be used in the calculations (EP 496.2 and D 497.4 ASAE standards. With the data related to the unit cost of ploughing a model Partial Least Squares (PLS has been achieved and validated, and it makes possible to predict the unit cost of this agricultural operation. Finally, the values of the variation of the economic competitiveness gap are reported for each standard.

  16. Multidetector CT evaluation of central airways stenoses: Comparison of virtual bronchoscopy, minimal-intensity projection, and multiplanar reformatted images

    Directory of Open Access Journals (Sweden)

    Dinesh K Sundarakumar

    2011-01-01

    Full Text Available Aims: To evaluate the diagnostic utility of virtual bronchoscopy, multiplanar reformatted images, and minimal-intensity projection in assessing airway stenoses. Settings and Design: It was a prospective study involving 150 patients with symptoms of major airway disease. Materials and Methods: Fifty-six patients were selected for analysis based on the detection of major airway lesions on fiber-optic bronchoscopy (FB or routine axial images. Comparisons were made between axial images, virtual bronchoscopy (VB, minimal-intensity projection (minIP, and multiplanar reformatted (MPR images using FB as the gold standard. Lesions were evaluated in terms of degree of airway narrowing, distance from carina, length of the narrowed segment and visualization of airway distal to the lesion. Results: MPR images had the highest degree of agreement with FB (Κ = 0.76 in the depiction of degree of narrowing. minIP had the least degree of agreement with FB (Κ = 0.51 in this regard. The distal visualization was best on MPR images (84.2%, followed by axial images (80.7%, whereas FB could visualize the lesions only in 45.4% of the cases. VB had the best agreement with FB in assessing the segment length (Κ = 0.62. Overall there were no statistically significant differences in the measurement of the distance from the carina in the axial, minIP, and MPR images. MPR images had the highest overall degree of confidence, namely, 70.17% (n = 40. Conclusion: Three-dimensional reconstruction techniques were found to improve lesion evaluation compared with axial images alone. The technique of MPR images was the most useful for lesion evaluation and provided additional information useful for surgical and airway interventions in tracheobronchial stenosis. minIP was useful in the overall depiction of airway anatomy.

  17. An acute stroke evaluation app: a practice improvement project.

    Science.gov (United States)

    Rubin, Mark N; Fugate, Jennifer E; Barrett, Kevin M; Rabinstein, Alejandro A; Flemming, Kelly D

    2015-04-01

    A point-of-care workflow checklist in the form of an iOS (iPhone Operating System) app for use by stroke providers was introduced with the objective of standardizing acute stroke evaluation and documentation at 2 affiliated academic medical centers. Providers used the app in unselected, consecutive patients undergoing acute stroke evaluation in an emergency department or hospital setting between August 2012 and January 2013 and August 2013 and February 2014. Satisfaction surveys were prospectively collected pre- and postintervention from residents, staff neurologists, and clinical data specialists. Residents (20 preintervention and 16 postintervention), staff neurologists (6 pre and 5 post), and clinical data specialists (4 pre and 4 post) participated in this study. All 16 (100%) residents had increased satisfaction with their ability to perform an acute stroke evaluation postintervention but only 9 (56%) of 16 felt the app was more help than hindrance. Historical controls aligned with preintervention results. Staff neurologists conveyed increased satisfaction with resident presentations and decision making when compared to preintervention surveys. Stroke clinical data specialists estimated a 50% decrease in data abstraction when the app data were used in the clinical note. Concomitant effect on door-to-needle (DTN) time at 1 site, although not a primary study measure, was also evaluated. At that 1 center, the mean DTN time decreased by 16 minutes when compared to the corresponding months from the year prior. The point-of-care acute stroke workflow checklist app may assist trainees in presenting findings in a standardized manner and reduce data abstraction time. The app may help reduce DTN time, but this requires further study.

  18. Evaluation of a Team Project Based Learning Module for Developing Employability Skills

    OpenAIRE

    Janice Whatley

    2012-01-01

    This paper presents a case study, in which a new module, aimed at enhancing students’ employ-ability skills, is evaluated. Employability skills for graduates from higher education are regarded as essential outcomes from their degree programmes, but it can be difficult to provide appropriate opportunities to develop these skills in the context of their studies. This paper describes a new module, called Live Projects, designed to provide project based learning on campus, but involv-ing local bu...

  19. Communications standards

    CERN Document Server

    Stokes, A V

    1986-01-01

    Communications Standards deals with the standardization of computer communication networks. This book examines the types of local area networks (LANs) that have been developed and looks at some of the relevant protocols in more detail. The work of Project 802 is briefly discussed, along with a protocol which has developed from one of the LAN standards and is now a de facto standard in one particular area, namely the Manufacturing Automation Protocol (MAP). Factors that affect the usage of networks, such as network management and security, are also considered. This book is divided into three se

  20. - LAA Occluder View for post-implantation Evaluation (LOVE) - standardized imaging proposal evaluating implanted left atrial appendage occlusion devices by cardiac computed tomography

    International Nuclear Information System (INIS)

    Behnes, Michael; Akin, Ibrahim; Sartorius, Benjamin; Fastner, Christian; El-Battrawy, Ibrahim; Borggrefe, Martin; Haubenreisser, Holger; Meyer, Mathias; Schoenberg, Stefan O.; Henzler, Thomas

    2016-01-01

    A standardized imaging proposal evaluating implanted left atrial appendage (LAA) occlusion devices by cardiac computed tomography angiography (cCTA) has never been investigated. cCTA datasets were acquired on a 3 rd generation dual-source CT system and reconstructed with a slice thickness of 0.5 mm. An interdisciplinary evaluation was performed by two interventional cardiologists and one radiologist on a 3D multi-planar workstation. A standardized multi-planar reconstruction algorithm was developed in order to assess relevant clinical aspects of implanted LAA occlusion devices being outlined within a pictorial essay. The following clinical aspects of implanted LAA occlusion devices were evaluated within the most appropriate cCTA multi-planar reconstruction: (1) topography to neighboring structures, (2) peri-device leaks, (3) coverage of LAA lobes, (4) indirect signs of neo-endothelialization. These are illustrated within concise CT imaging examples emphasizing the potential value of the proposed cCTA imaging algorithm: Starting from anatomical cCTA planes and stepwise angulation planes perpendicular to the base of the LAA devices generates an optimal LAA Occluder View for post-implantation Evaluation (LOVE). Aligned true axial, sagittal and coronal LOVE planes offer a standardized and detailed evaluation of LAA occlusion devices after percutaneous implantation. This pictorial essay presents a standardized imaging proposal by cCTA using multi-planar reconstructions that enables systematical follow-up and comparison of patients after LAA occlusion device implantation. The online version of this article (doi:10.1186/s12880-016-0127-y) contains supplementary material, which is available to authorized users