WorldWideScience

Sample records for project ethogram important

  1. Exploring Ethograms in the Schoolyard: A Lesson on Animal Behavior

    Science.gov (United States)

    Graszer, Christina L.; Gnau, Katie; Melber, Leah M.

    2012-01-01

    This article highlights a core lesson that has been used in a number of Lincoln Park Zoo educational programs. The lesson teaches students to conduct an ethological, or animal behavior, study on a bird. This study can be implemented in a variety of outdoor settings, including a park, schoolyard, or zoo. Using an ethogram, students will practice…

  2. Ethograms indicate stable well-being during prolonged training phases in rhesus monkeys used in neurophysiological research.

    Science.gov (United States)

    Hage, Steffen R; Ott, Torben; Eiselt, Anne-Kathrin; Jacob, Simon N; Nieder, Andreas

    2014-01-01

    Awake, behaving rhesus monkeys are widely used in neurophysiological research. Neural signals are typically measured from monkeys trained with operant conditioning techniques to perform a variety of behavioral tasks in exchange for rewards. Over the past years, monkeys' psychological well-being during experimentation has become an increasingly important concern. We suggest objective criteria to explore whether training sessions during which the monkeys work under controlled water intake over many days might affect their behavior. With that aim, we analyzed a broad range of species-specific behaviors over several months ('ethogram') and used these ethograms as a proxy for the monkeys' well-being. Our results show that monkeys' behavior during training sessions is unaffected by the duration of training-free days in-between. Independently of the number of training-free days (two or nine days) with ad libitum food and water supply, the monkeys were equally active and alert in their home group cages during training phases. This indicates that the monkeys were well habituated to prolonged working schedules and that their well-being was stably ensured during the training sessions.

  3. Validation of a Behavioral Ethogram for Assessing Postoperative Pain in Guinea Pigs (Cavia porcellus).

    Science.gov (United States)

    Dunbar, Misha L; David, Emily M; Aline, Marian R; Lofgren, Jennifer L

    2016-01-01

    Although guinea pigs (Cavia porcellus) have been used in research for more than a century and remain the most prevalent USDA-covered species, little has been elucidated regarding the recognition of clinical pain or analgesic efficacy in this species. We sought to assess pain in guinea pigs by using newer, clinically relevant methods that have been validated in other rodent species: the behavioral ethogram and cageside proxy indicator. In this study, 10 male guinea pigs underwent electronic von Frey testing of nociception, remote videorecording of behavior, and cageside assessment by using time-to-consumption (TTC) of a preferred treat test. These assessments were performed across 2 conditions (anesthesia only and castration surgery under anesthesia) at 3 time points (2, 8, and 24 h after the event). The anesthesia only condition served to control for the nonpainful but potentially distressing components of the surgical experience. Compared with those after anesthesia only conditions, subtle body movements were increased and nociceptive thresholds were decreased at 2 and 8 h after surgery. At 24 h, neither subtle body movement behaviors nor nociceptive thresholds differed between the 2 conditions. In contrast, TTC scores did not differ between the anesthesia only and surgery conditions at any time point, underscoring the challenge of identifying pain in this species through cageside evaluation. By comparing ethogram scores with measures of nociception, we validated select behaviors as pain-specific. Therefore, our novel ethogram allowed us to assess postoperative pain and may further serve as a platform for future analgesia efficacy studies in guinea pigs.

  4. Quantifying Equid Behavior - A Research Ethogram for Free-Roaming Feral Horses

    Science.gov (United States)

    Ransom, Jason I.; Cade, Brian S.

    2009-01-01

    Feral horses (Equus caballus) are globally distributed in free-roaming populations on all continents except Antarctica and occupy a wide range of habitats including forest, grassland, desert, and montane environments. The largest populations occur in Australia and North America and have been the subject of scientific study for decades, yet guidelines and ethograms for feral horse behavioral research are largely absent in the scientific literature. The U.S. Geological Survey (USGS) Fort Collins Science Center conducted research on the influences of the immunocontraceptive porcine zona pellucida (PZP) on feral horse behavior from 2003-2006 in three discrete populations in the American west. These populations were the Little Book Cliffs Wild Horse Range in Colorado, McCullough Peaks Herd Management Area in Wyoming, and Pryor Mountain Wild Horse Range in Montana; the research effort included over 1,800 hours of behavioral observations of 317 adult free-roaming feral horses. An ethogram was developed during the course of this study to facilitate accurate scientific data collection on feral horse behavior, which is often challenging to quantify. By developing this set of discrete behavioral definitions and a set of strict research protocols, scientists were better able to address both applied questions, such as behavioral changes related to fertility control, and theoretical questions, such as understanding networks and dominance hierarchies within social groups of equids.

  5. An ethogram for Benthic Octopods (Cephalopoda: Octopodidae).

    Science.gov (United States)

    Mather, Jennifer A; Alupay, Jean S

    2016-05-01

    The present paper constructs a general ethogram for the actions of the flexible body as well as the skin displays of octopuses in the family Octopodidae. The actions of 6 sets of structures (mantle-funnel, arms, sucker-stalk, skin-web, head, and mouth) combine to produce behavioral units that involve positioning of parts leading to postures such as the flamboyant, movements of parts of the animal with relation to itself including head bob and grooming, and movements of the whole animal by both jetting in the water and crawling along the substrate. Muscular actions result in 4 key changes in skin display: (a) chromatophore expansion, (b) chromatophore contraction resulting in appearance of reflective colors such as iridophores and leucophores, (c) erection of papillae on the skin, and (d) overall postures of arms and mantle controlled by actions of the octopus muscular hydrostat. They produce appearances, including excellent camouflage, moving passing cloud and iridescent blue rings, with only a few known species-specific male visual sexual displays. Commonalities across the family suggest that, despite having flexible muscular hydrostat movement systems producing several behavioral units, simplicity of production may underlie the complexity of movement and appearance. This systematic framework allows researchers to take the next step in modeling how such diversity can be a combination of just a few variables. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  6. Study of mouse behavioural response in microgravity: ethogram and neurobiological related

    Science.gov (United States)

    Santucci, Daniela; Francia, Nadia; Schwartz, Silvia; Biticchi, Roberta; Liu, Yi; Cancedda, Ranieri; Aloe, Luigi

    The conquest of space, which started with the dog Laika in 1966 to be followed few years later by Yuri Gagarin, has witnessed an increasing numbers of both vertebrates (tadpoles, frogs, rats mice etc.) and invertebrates (flies, scorpions, protozoa) species exposed to zero gravity levels. Animals are sent into orbit to proactively foresee possible health problems in humans. The issue of animal exposure to un-physiological gravity is of primary importance to i) understand behavioural and physiological adaptations in such environment as well as ii) develop coun-termeasures to improve 0-g life conditions and reduce possible animal suffering. The Mouse Drawer System (MDS), an Italian facility, has been transferred to the International Space Sta-tion with a first experiment investigating mechanisms underlying bone mass loss in microgravity in mice. Preliminary and ground-based control experiments have been conducted with six mice housed individually inside the MDS facility for 20 and 100 days. The behavioural repertoire of wild-type and transgenic mice housed in the MDS has been videorecorded with the observation subsystem, which allows to monitor animal's behavior through the use of 6 video cameras. The behavioural patterns characterizing mice in the MDS system have been finely analysed at several time points during the the experiment. Moreover, neurobiological parameters, known to be involved in the response to stress, have been evaluated. In particular, NGF and BDNF levels have been measured in the central nervous system (hippocampus, striatum, and cortex), adrenal gland and limbs. Preliminary data from ground based experiment revealed Several dif-ferences in behavioural profile between wt and tg mice, with transgenic ones apparently more active than wild type controls. Moreover a clear difference in time spent in different areas of the MDS cage was observed. Finally changes in neurotrophins levels were observed in relation to both genotype and environmental

  7. Revisiting play elements and self-handicapping in play: a comparative ethogram of five Old World monkey species.

    Science.gov (United States)

    Petrů, Milada; Spinka, Marek; Charvátová, Veronika; Lhota, Stanislav

    2009-08-01

    Play behavior has been viewed as a mixture of elements drawn from "serious" behavior, interspersed by ritualized play signals. Two other types of play behaviors have been overlooked: patterns that are dissimilar from any serious behavior and patterns with self-handicapping character, that is, those that put the animal into unnecessary disadvantageous positions or situations. Here the authors show that these 2 types of patterns can constitute a major part of play repertoire. From our own videorecordings and observations, we constructed play ethograms of 5 monkey species (Semnopithecus entellus, Erythrocebus patas, Chlorocebus pygerythrus, Cercopithecus neglectus, and Cercopithecus diana). The authors evaluated the self-handicapping character of each pattern and in Hanuman langurs also the (dis)similarity to serious behavior. Of the 74 patterns in the 5 species, 33 (45%) were judged to have a self-handicapping character. Of 48 patterns observed in langurs, 16 (33%) were totally dissimilar to any serious langur behavior known to us. The authors discuss the possibility that the different types of play elements may have different functions in play. Copyright 2009 APA, all rights reserved.

  8. Reproductive ethogram and mate selection in captive wild Senegalese sole (Solea senegalensis)

    Energy Technology Data Exchange (ETDEWEB)

    Carazo, I.; Chereguini, O.; Martín, I.; Huntingford, F.; Duncan, N.

    2016-07-01

    Senegalese e sole (Solea senegalensis) have a high potential for aquaculture that is hampered by reproductive behavioural problems. These problems result in limited breeder participation in spawning. The present study provided an ethogram and described mate selection and spawning of captive wild Senegalese sole. Two tanks of breeders were studied that had 29 and 25 breeders (mean weight = 1.6 ± 0.1 kg). The behaviour was studied during 20 periods of 24 hours: 10 periods where spawning events were recorded and 10 control periods without spawning events. Periods where spawning occurred had three times more locomotor activity than periods without spawning. Two distinct behaviours, termed the “following” behaviour and the “coupled swim”, were only observed during periods with spawning. The courtship sequence (n=12) began with males predominantly involved in “following” behaviours, whilst females remained mainly stationary on the bottom of the tank. Males rested on the females and encouraged the females to begin swimming. When the female began to swim the male swam under the female and the pair made a “coupled swim” to the surface to release gametes. Gamete release was strictly in pairs of one male with one female. Failed “coupled swims” without gamete release were 5.6 times more frequent than successful “coupled swims”. Mate selection was evident as the sole engaged in: paired spawning, males displayed to females, males encouraged females to spawn and females accepted or rejected the male’s advances. The mate selection process provided the opportunity for fish to dominate the spawning and also demonstrated how fish were excluded from spawning.

  9. Reproductive ethogram and mate selection in captive wild Senegalese sole (Solea senegalensis)

    International Nuclear Information System (INIS)

    Carazo, I.; Chereguini, O.; Martín, I.; Huntingford, F.; Duncan, N.

    2016-01-01

    Senegalese e sole (Solea senegalensis) have a high potential for aquaculture that is hampered by reproductive behavioural problems. These problems result in limited breeder participation in spawning. The present study provided an ethogram and described mate selection and spawning of captive wild Senegalese sole. Two tanks of breeders were studied that had 29 and 25 breeders (mean weight = 1.6 ± 0.1 kg). The behaviour was studied during 20 periods of 24 hours: 10 periods where spawning events were recorded and 10 control periods without spawning events. Periods where spawning occurred had three times more locomotor activity than periods without spawning. Two distinct behaviours, termed the “following” behaviour and the “coupled swim”, were only observed during periods with spawning. The courtship sequence (n=12) began with males predominantly involved in “following” behaviours, whilst females remained mainly stationary on the bottom of the tank. Males rested on the females and encouraged the females to begin swimming. When the female began to swim the male swam under the female and the pair made a “coupled swim” to the surface to release gametes. Gamete release was strictly in pairs of one male with one female. Failed “coupled swims” without gamete release were 5.6 times more frequent than successful “coupled swims”. Mate selection was evident as the sole engaged in: paired spawning, males displayed to females, males encouraged females to spawn and females accepted or rejected the male’s advances. The mate selection process provided the opportunity for fish to dominate the spawning and also demonstrated how fish were excluded from spawning.

  10. Important projects of the Division

    International Nuclear Information System (INIS)

    2008-01-01

    In this chapter important projects of the Division for Radiation Safety, NPP Decommissioning and Radwaste Management of the VUJE, a. s. are presented. Division for Radiation Safety, NPP Decommissioning and Radwaste Management has successfully carried out variety of significant projects. The most significant projects that were realised, are implemented and possible future projects are introduced in the following part of presentation.

  11. Can ethograms be automatically generated using body acceleration data from free-ranging birds?

    Directory of Open Access Journals (Sweden)

    Kentaro Q Sakamoto

    Full Text Available An ethogram is a catalogue of discrete behaviors typically employed by a species. Traditionally animal behavior has been recorded by observing study individuals directly. However, this approach is difficult, often impossible, in the case of behaviors which occur in remote areas and/or at great depth or altitude. The recent development of increasingly sophisticated, animal-borne data loggers, has started to overcome this problem. Accelerometers are particularly useful in this respect because they can record the dynamic motion of a body in e.g. flight, walking, or swimming. However, classifying behavior using body acceleration characteristics typically requires prior knowledge of the behavior of free-ranging animals. Here, we demonstrate an automated procedure to categorize behavior from body acceleration, together with the release of a user-friendly computer application, "Ethographer". We evaluated its performance using longitudinal acceleration data collected from a foot-propelled diving seabird, the European shag, Phalacrocorax aristotelis. The time series data were converted into a spectrum by continuous wavelet transformation. Then, each second of the spectrum was categorized into one of 20 behavior groups by unsupervised cluster analysis, using k-means methods. The typical behaviors extracted were characterized by the periodicities of body acceleration. Each categorized behavior was assumed to correspond to when the bird was on land, in flight, on the sea surface, diving and so on. The behaviors classified by the procedures accorded well with those independently defined from depth profiles. Because our approach is performed by unsupervised computation of the data, it has the potential to detect previously unknown types of behavior and unknown sequences of some behaviors.

  12. Artificially suckled I.H.D.H. (Italian Heavy Draught Horse foals: in vivo performances and ethograms

    Directory of Open Access Journals (Sweden)

    Pasquale Centoducati

    2010-01-01

    Full Text Available The research was carried out on 6 “Italian Heavy Draught Horse” orphan foals ar- tificially suckled by an automatic milk feeder. The purpose of the research was to show that artificial weaning does not have a negative effect on a foal’s growth and welfare. The foals were reared in an indoor box, weighed every 3 weeks from day 4 after birth and observed for 24 consecutive hours at the age of 4, 10, 47, 114, 142 and 176 days, to compile an ethogram which includes biorhythms, and social, alimentary and eliminative behavioural patterns. During the study, “daily weight gains” were greater than 1610 g/d; but between 26 and 46 days and after weaning, values were lower than 1230 g/d, and between 172 and 193 days, prior to slaughtering, they were of 1090 g/d. Age had a significant (P<0.001 on almost all the ethological parameters considered, above all for the time spent lying down above all for the time spent lying down and the licking structures (P<0.01, and for the drinking bouts (P<0.05. The period of adaptation to artificial feeding certainly lasted at least two weeks. These results suggest that the technique of artificial suckling can be applied to horses without negative effects on growth and welfare, any subjects showed abnormal behaviour.

  13. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  14. Important projects are being implemented jointly

    International Nuclear Information System (INIS)

    Medeliene, D.

    1998-01-01

    Full text: Sweden is continuing its support to Lithuania in the field of nuclear safety. The major current projects include the testing of gap between graphite and pressure tube measuring device, the pressure tube investigation of material properties, content of hydrogen, microstructure, etc., ALS Structure verification using non-destructive testing, Conceptual study on Leak Before Break, Management seminars for VATESI, Multimedia System for the Ignalina NPP's Information Center and Waste management projects. Some of the projects are partially financed by Ignalina NPP. Sweden and Norway provide financing for the extremely important and expensive project - Physical protection: perimeter around the plant. Two new EC projects, Continuation of support to VATESI: licensing, inservice and decommissioning, and Phare TSO project to help building up TSO competence in Lithuania are no less important. In the beginning of September a functional exercise was organised with the Ignalina NPP emergency preparedness Information unit. This exercise was the second one of the two to prepare the personnel for the problems they have to solve in communication with public and media in the case of an accident at the Ignalina NPP

  15. IMPORTANCE OF FINANCING THE SOCIAL ECONOMY PROJECTS

    OpenAIRE

    Victor NICOL‚ESCU; Corina CACE; Sorin CACE

    2012-01-01

    The re-emergence of the social economy sector as important agent for occupation, economic growth, social solidarity, associationism and social services, coincided with a higher importance of running program and project- based activities in all European countries, irrespective whether they are member states of candidate states. Within the context of the benefits specific to the social economy projects it is important to debate and analyse the subject of continuing the activities of this form o...

  16. CNPC Appoints Chief Experts for Important Technological Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Jianzhong

    2006-01-01

    @@ On June 27th, China National Petroleum Corporation (CNPC) held a public recruitment to appoint chief experts in Beijing for its important technological projects, which is the first time for CNPC to appoint chief managers by the means of competitive recruitment. This recruitment covers four projects, such as drilling, logging, geophysical survey and ground engineering with 15 projects. Of those,there are 8 drilling projects, which make up 50 percent of all the important technological projects for public recruitment. CNPC expects to further boost the chief expert responsibility system and promote the research and development (R&D) of technological project on the basis of the public recruitment. The company completes the recruitment following the procedure of making announcement, conducting competitive recruitment and giving publicity. On July 25th, the appointment ceremony was held by CNPC and 15 experts were awarded the certificates. CNPC is entering a new stage for the implementation of the technology and talent strategy for the 11th Five-Year Plan. What's more, a new management mode is taking shape for the technological project and for the construction of technological personnel pool.

  17. Taipower - latest projects to boost coal import levels

    Energy Technology Data Exchange (ETDEWEB)

    Hargreaves, D

    1985-05-01

    The activities are reviewd for Taipower, the state enterprise electrical power utility for Taiwan RC: its generating facilities and comparability; the status of major projects, especially the Taichung thermal project; the status of coal; coal burn performance; air pollution controls; coal ash performance; coal imports; transport logistics; including terminal facilities at the Taichung thermal power plant.

  18. The Importance of Soft Skills and it Project Managers’ Personality Type

    Directory of Open Access Journals (Sweden)

    Cíntia Araújo

    2016-07-01

    Full Text Available Information technology (IT is a strategic element in business as it is fundamental to create value to organizations. To be efficient, project managers need to develop other competencies besides their technical skills (“hard skills”. This paper aims to show the importance of soft skills in the development of IT project managers’ competencies by answering the following questions (1 “which is the impact of “soft skills” on IT projects management?” and (2 “the personality type of the project manager can influence the development of his/her soft skills?”. To answer these questions, we conducted an exploratory and qualitative research. To collect data, we interviewed IT project managers and applied the MBTI test to identify their personality type. As we crossed the results of MBTI tests and content of the interviews, we noticed that some professionals have a personality type that might hinder them from developing some soft skills. Another important finding is that leadership and communication are the most important soft skills in project management according to IT project managers.  This research contributes to the academia as it indicates opportunities for further studies on the relationship of personality type and competence development. A managerial implication of research results is that managers and leaders can use personality tests such as MBTI to prevent relationship conflicts in teams as well as to design training programs that best suit their subordinates’ personality traits.

  19. IMPORTANCE OF EARNED VALUE METHOD (EVA IN THE PERFORMANCE ANALYSIS OF PROJECTS

    Directory of Open Access Journals (Sweden)

    MARGARITA JANESKA

    2016-04-01

    Full Text Available The economics of the projects is an important process in the project management. Effective control of projects is based on appropriate methods for monitoring, and the entire project, the timetable, cost, quality and risk. Unlike accounting aspects in project management are looking for information that allow insight into the status and trends of financial progress of the project. Such information provide a method of earned value. It is a key component for assessing the actual performance of the project. The method of earned value is a better indicator of the progress of the project in comparison to the classical method of comparing planned and actual costs. This method shows the profit in relation to actual costs at a specific time point. This method is the basis for calculating the index of the project performance. In this sense, MS Project provides many opportunities for quality control and monitoring of the realization of the projects. In this study will be described the architecture of this method, outlined the benefits of the application of this method, and the basic criteria that should satisfy project management to be able to apply it.

  20. 76 FR 23642 - Culturally Significant Objects Imported for Exhibition Determinations: “Projects 95: Runa Islam”

    Science.gov (United States)

    2011-04-27

    ... DEPARTMENT OF STATE [Public Notice: 7433] Culturally Significant Objects Imported for Exhibition Determinations: ``Projects 95: Runa Islam'' SUMMARY: Notice is hereby given of the following determinations... the exhibition ``Projects 95: Runa Islam'' imported from abroad for temporary exhibition within the...

  1. 75 FR 3781 - Culturally Significant Object Imported for Exhibition; Determinations: “Projects 92: Yin Xiuzhen”

    Science.gov (United States)

    2010-01-22

    ... DEPARTMENT OF STATE [Public Notice 6884] Culturally Significant Object Imported for Exhibition; Determinations: ``Projects 92: Yin Xiuzhen'' SUMMARY: Notice is hereby given of the following determinations... ``Projects 92: Yin Xiuzhen,'' imported from abroad for temporary exhibition within the United States, is of...

  2. ACCIDENT PHENOMENA OF RISK IMPORTANCE PROJECT - Continued RESEARCH CONCERNING SEVERE ACCIDENT PHENOMENA AND MANAGEMENT IN Sweden

    International Nuclear Information System (INIS)

    Rolandson, S.; Mueller, F.; Loevenhielm, G.

    1997-01-01

    Since 1988 all reactors in Sweden have mitigating measures, such as filtered vents, implemented. In parallel with the work of implementing these measures, a cooperation effort (RAMA projects) between the Swedish utilities and the Nuclear Power Inspectorate was performed to acquire sufficient knowledge about severe accident research work. The on-going project has the name Accident Phenomena of Risk Importance 3. In this paper, we will give background information about severe accident management in Sweden. In the Accident Phenomena of Risk Importance 3 project we will focus on the work concerning coolability of melted core in lower plenum which is the main focus of the In-vessel Coolability Task Group within the Accident Phenomena of Risk Importance 3 project. The Accident Phenomena of Risk Importance 3 project has joined on international consortium and the in-vessel cooling experiments are performed by Fauske and Associates, Inc. in Burr Ridge, Illinois, United States America, Sweden also intends to do one separate experiment with one instrument penetration we have in Swedish/Finnish BWR's. Other parts of the Accident Phenomena of Risk Importance 3 project, such as support to level 2 studies, the research at Royal Institute of Technology and participation in international programs, such as Cooperative Severe Accident Research Program, Advanced Containment Experiments and PHEBUS will be briefly described in the paper

  3. A Framework for Categorizing Important Project Variables

    Science.gov (United States)

    Parsons, Vickie S.

    2003-01-01

    While substantial research has led to theories concerning the variables that affect project success, no universal set of such variables has been acknowledged as the standard. The identification of a specific set of controllable variables is needed to minimize project failure. Much has been hypothesized about the need to match project controls and management processes to individual projects in order to increase the chance for success. However, an accepted taxonomy for facilitating this matching process does not exist. This paper surveyed existing literature on classification of project variables. After an analysis of those proposals, a simplified categorization is offered to encourage further research.

  4. The Fermi LAT Very Important Project (VIP) List of Active Galactic Nuclei

    Science.gov (United States)

    Thompson, David J.; Fermi Large Area Telescope Collaboration

    2018-01-01

    Using nine years of Fermi Gamma-ray Space Telescope Large Area Telescope (LAT) observations, we have identified 30 projects for Active Galactic Nuclei (AGN) that appear to provide strong prospects for significant scientific advances. This Very Important Project (VIP) AGN list includes AGNs that have good multiwavelength coverage, are regularly detected by the Fermi LAT, and offer scientifically interesting timing or spectral properties. Each project has one or more LAT scientists identified who are actively monitoring the source. They will be regularly updating the LAT results for these VIP AGNs, working together with multiwavelength observers and theorists to maximize the scientific return during the coming years of the Fermi mission. See https://confluence.slac.stanford.edu/display/GLAMCOG/VIP+List+of+AGNs+for+Continued+Study

  5. Imports of waste fuels for energy recovery in Sweden - Sub-Project 1; Import av avfall till energiutvinning i Sverige - Delprojekt 1 inom projektet Perspektiv paa framtida avfallsbehandling

    Energy Technology Data Exchange (ETDEWEB)

    Sahlin, Jenny; Holmstroem, David; Bisaillon, Mattias

    2013-09-01

    Swedish imports of waste fuels may increase to 1.5 million tonnes by 2015, when new waste-fuelled combined heat and power plants are in operation; and to 2.5 million tonnes by 2020, if all planned capacity is built. This is the case if national targets for increased material recycling and biological treatment are reached; which means that smaller amounts of mixed waste remains for incineration. When the import of the waste fuel into Sweden has increased, also need of knowledge has increased, as well as the concerns and fears. The aim of the project 'Imports of waste to energy recovery in Sweden', therefore, is to create an improved basis for decisions and communications concerning the import of waste fuel, as well as to study its conditions, opportunities and obstacles. The target group is interested operators, representatives of public authorities and decision-makers. Data includes analysis of future imported quantities, possible import markets, policy instruments and its effects, concerns and fears, economic aspects and effects on climate change while importing the waste fuel. The project is one of five sub-projects in 'Perspectives on the future waste treatment'. The project has been carried out through data collection, computer modelling, interviews as well as discussion and analysis in the working and reference groups. The goal is estimated to having been reached, the results are already used. From media, there is an interest of the results, and the project has already been referred to and presented at conferences. The results are thus already well-spread.

  6. Improvement of methods of evaluation of investment projects in the context of import substitution

    Directory of Open Access Journals (Sweden)

    Kuvshinov M.S.

    2017-01-01

    Full Text Available Due to the imposition of sanctions, based more on geopolitical interests, there were additional essential restrictions on sources of external credits, use of import raw materials and technologies, possibilities of attraction to work of the qualified employees which do not have the Russian nationality, participation in the international technology and scientific projects. At similar restrictions of different resources investment decisions are made extremely carefully, and especially careful and reasonable efficiency evaluation of the investments is required. Traditionally used techniques of efficiency evaluation of investment projects not fully consider strategic interests of owners of industrial enterprises and investors. Decrease in risks requires higher quality of project evaluation. In this work the method of multi-level consistently complex integral assessment of investment projects on an indicator of the integral indicator of their efficiency implementing consecutive selection of investment projects from a portfolio on essential indicators of commercial effectiveness, efficiency of production business activities, a financial state and productivity of activity is provided. The developed method of a complex assessment of investment projects is implemented for practical application by the software product allowing to create on the basis of economic-mathematical modeling specific recommendations in economic practice of industrial enterprises during the developing and implementation of investment strategies. The conclusion that for the Russian economy in the conditions of import substitution accounting of all set of interests of investors and owners of the enterprises provides development and implementation of reasonable investment strategies is drawn.

  7. The Importance of Investment Decisions in Project Management

    Directory of Open Access Journals (Sweden)

    Cosmina Mădălina Pop

    2008-10-01

    Full Text Available The financing decision alongside with investment decision represents the core of financial management. The paper presents the main steps in realizing investment projects, the option criteria used in pre-investment analysis, the techniques of financing the investments project, but also the methods of evaluation applied in selecting the most suitable project, accordingly with company’s developlment strategy and policy.

  8. Modelling engagement in dementia through behaviour. Contribution for socially interactive robotics.

    Science.gov (United States)

    Perugia, Giulia; Diaz Doladeras, Marta; Mallofre, Andreu Catala; Rauterberg, Matthias; Barakova, Emilia

    2017-07-01

    In this paper, we present a novel tool to measure engagement in people with dementia playing board games and interacting with a social robot, Pleo. We carried out two studies to reach a comprehensive inventory of behaviours accounting for engagement in dementia. The first one is an exploratory study aimed at modelling engagement in cognitive board games. The second one is a longitudinal study to investigate how people with dementia express engagement in cognitive games and in interactions with social robots. We adopted a technique coming from Ethology to mould behaviour, the ethogram. Ethogram is founded on low level behaviours, and allows hierarchical structuring. Herein, we present preliminary results consisting in the description of two ethograms and in their structuring obtained through thematic analysis. Such results show that an underlying structure of engagement exists across activities, and that different activities trigger different behavioural displays of engagement that adhere to such a structure.

  9. THE QUALITY IMPORTANCE IN A PROJECT MANAGEMENT COMPLEXITY ENVIRONMENT

    OpenAIRE

    Adrian UNGUREANU; Anca VARGA

    2009-01-01

    A project is a temporary endeaver undertaken to creat a unique product, service or result. The temporary nature of project indicates a definite beginning and end. The end is reached when the project’s objectives have been achieved or when the project is terminated becouse its objectives will not or cannot be met, when the need for the project no longer exist. Temporary does not necessarily mean short in duration. Temporary does not generally apply to the product, service, or result created by...

  10. The importance of procurement negotiations for project success

    NARCIS (Netherlands)

    Hoezen, M; Volker, L.

    2015-01-01

    The allocation of a contract for public construction projects in Europe usually requires a European tender procedure. This has to do with the size, the use of public means and the complexity of this type of projects. Compared to regular partnerships, it is hard to develop trust between the buyer and

  11. A structural and stochastic optimal model for projections of LNG imports and exports in Asia-Pacific

    Directory of Open Access Journals (Sweden)

    Tom Kompas

    2016-06-01

    Full Text Available The Asia-Pacific region, the largest and fastest growing liquefied natural gas (LNG market in the world, has been undergoing radical changes over the past few years. These changes include considerable additional supplies from North America and Australia, and a recent LNG price slump resulting from an oil-linked pricing mechanism and demand uncertainties. This paper develops an Asia-Pacific Gas Model (APGM, based on a structural, stochastic and optimising framework, providing a valuable tool for the projection of LNG trade in the Asia-Pacific region. With existing social-economic conditions, the model projects that Asia-Pacific LNG imports are expected to increase by 49.1 percent in 2020 and 95.7 percent in 2030, compared to 2013. Total LNG trade value is estimated to increase to US$127.2 billion in 2020 and US$199.0 billion in 2030. Future LNG trade expansion is mainly driven by emerging and large importers (i.e., China and India, and serviced, most importantly, by new supplies from Australia and the USA. The model's projected results are sensitive to changes in expected oil prices, pricing mechanisms, economic growth and energy policies, as well as unexpected geopolitical-economic events.

  12. Il Benessere dei cani ospitati nei canili: valutazione dei parametri comportamentali e fisiologici anche ai fini dell’adottabilita’ e del contenimento del fenomeno del randagismo

    OpenAIRE

    Spissu, Nicoletta

    2010-01-01

    The present study evaluates the welfare of shelter dogs in Sardinia using physiologic and ethologic parameters like ematochemical analysis on blood samples and ethogram to assess the adoptability index of each dog . In Italy animal shelters suffer different problems like overpopulation, lack of human and economic resources. It is important to test the welfare of shelter dogs and to evaluate their ethologic characteristics and personality traits to evidence any behavioral disorder....

  13. Conceptual Evolution and Importance of Andragogy towards the Scope Optimization of University Academic Rural Development Programs and Projects

    Directory of Open Access Journals (Sweden)

    José Bernal Azofeifa-Bolaños

    2016-12-01

    Full Text Available This study was carried out with the objective of describing the evolution and importance of andragogical processes in the search of rural profiles committed to the university work in the development and implementation of programs and projects. Among its main contributions, the importance of knowing and teaching processes applied strictly for adults by university coordinators of programs and projects stands out. The relevance of applying this kind of knowledge will allow efficient use of institutional financial resources, particularly for the real commitment of the rural adult community towards the implementation of field activities and accomplishing, in a shorter term, the expected academic achievement. A successful project experience is described in which some andragogical strategies were applied through extension, and which produced a better participation and engagement from rural people with the projects developed by the University. Consequently, applicability of these concepts in the programs and projects of rural development promoted through universities must lay the foundation for regional rural development strategies with the ultimate goal of finding ways to improve the quality of life of people in particular scenarios.

  14. Procurement and quality control of components important to safety in nuclear engineering projects

    International Nuclear Information System (INIS)

    Zhang Zhihua; Zhang Yiyun

    2006-01-01

    The procurement and quality control of components is a very important work in the nuclear engineering. This paper introduces the project management techniques, such as how to make a plan of components purchase in nuclear engineering. This paper discussed the classification of components, evaluation of the potential suppliers, invitation of bids, exchange of design details with the suppliers, quality assurance and quality assurance audit, and the equipment checks before acceptance and some engineering experiences. (authors)

  15. Evaluation of Pain Assessment Techniques and Analgesia Efficacy in a Female Guinea Pig (Cavia porcellus) Model of Surgical Pain

    Science.gov (United States)

    Oliver, Vanessa L; Athavale, Stephanie; Simon, Katherine E; Kendall, Lon V; Nemzek, Jean A; Lofgren, Jennifer L

    2017-01-01

    Guinea pigs (Cavia porcellus) are a frequently used species in research, often involving potentially painful procedures. Therefore, evidence-based recommendations regarding analgesia are critically needed to optimize their wellbeing. Our laboratory examined the efficacy of carprofen and extended-release (ER) buprenorphine, alone and as a multimodal combination, for relieving postsurgical pain in guinea pigs. Animals were assessed by using evoked (mechanical hypersensitivity), nonevoked (video ethogram, cageside ethogram, time-to-consumption test), and clinical (weight loss) measurements for 96 h during baseline, anesthesia–analgesia, and hysterectomy conditions. In addition, ER buprenorphine was evaluated pharmacologically. Guinea pigs treated with a single analgesic showed increased mechanical sensitivity for at least 96 h and indices of pain according to the video ethogram for as long as 8 h, compared with levels recorded during anesthesia–analgesia. In contrast, animals given both analgesics demonstrated increased mechanical sensitivity and behavioral evidence of pain for only 2 h after surgery compared with anesthesia–analgesia. The cageside ethogram and time-to-consumption tests failed to identify differences between conditions or treatment groups, highlighting the difficulty of identifying pain in guinea pigs without remote observation. Guinea pigs treated with multimodal analgesia or ER buprenorphine lost at least 10% of their baseline weights, whereas weight loss in carprofen animals was significantly lower (3%). Plasma levels for ER buprenorphine exceeded 0.9 ng/mL from 8 to 96 h after injection. Of the 3 analgesia regimens evaluated, multimodal analgesia provided the most effective pain control in guinea pigs. However the weight loss in the ER buprenorphine–treated animals may need to be considered during analgesia selection. PMID:28724492

  16. Importing statistical measures into Artemis enhances gene identification in the Leishmania genome project

    Directory of Open Access Journals (Sweden)

    McDonagh Paul D

    2003-06-01

    Full Text Available Abstract Background Seattle Biomedical Research Institute (SBRI as part of the Leishmania Genome Network (LGN is sequencing chromosomes of the trypanosomatid protozoan species Leishmania major. At SBRI, chromosomal sequence is annotated using a combination of trained and untrained non-consensus gene-prediction algorithms with ARTEMIS, an annotation platform with rich and user-friendly interfaces. Results Here we describe a methodology used to import results from three different protein-coding gene-prediction algorithms (GLIMMER, TESTCODE and GENESCAN into the ARTEMIS sequence viewer and annotation tool. Comparison of these methods, along with the CODONUSAGE algorithm built into ARTEMIS, shows the importance of combining methods to more accurately annotate the L. major genomic sequence. Conclusion An improvised and powerful tool for gene prediction has been developed by importing data from widely-used algorithms into an existing annotation platform. This approach is especially fruitful in the Leishmania genome project where there is large proportion of novel genes requiring manual annotation.

  17. Geothermal energy: an important but disregarded form of renewable energy; geological situation, projects and economy in Austria

    International Nuclear Information System (INIS)

    Walker-Hertkorn, S.

    2000-05-01

    This study deals with the topic geothermal energy. Although geothermal energy is an important energy sector within the area of the renewable energies, the European policy downgraded this important, promising energy sector in 1999. Normally, geothermal energy cannot be regarded as a renewable energy source because the heat content of the Earth, the gravitational heat, the source heat, frictional heat and the decay of radioactive isotopes in the further process of geologic history will eventually be exhausted. However, we are referring here to many millions of years. At the present time, geothermal energy can thus be regarded as an inexhaustible renewable energy source. This work is focused on the geothermal situation in Austria. For many people, the term 'geothermal energy' is associated with countries such as Iceland, Italy (Larderello) and New Zealand. However, in Austria there are also innovative projects in the geothermal energy sector that only very few people know about. Some of these trend-setting projects are presented here. Regarding the total situation in Austria, the geothermal potential is described specifically for the Calcareous Alpine nappe and the Vienna Basin. Furthermore, the first results concerning successful injection in Upper Austria and up to now unconsidered locations for geothermal energy plants are presented. This work attempts to present the attractiveness of geothermal energy projects to the public, thus emphasizing the importance of discussing it again on the political level. (author)

  18. AMERICAN QUARTER HORSES’ BEHAVIORAL FORMS

    Directory of Open Access Journals (Sweden)

    Iryna Olexandrivna Suprun

    2016-02-01

    Full Text Available The review of basic literary sources is made out of behavior of horse. On the basis of the field researches (visual supervisions after three different aged groups of mares it is built ethograms. An ethogram of behavioral forms among mares was developed. They represent the different forms of mares’ behavior in a dynamics. The reaction of mares of the different age-related and physiology groups on appearance of extraneous objects on a pasture, their activity, hierarchy, socialization is analyzed in groups. Several main studies on equines were reviewed in ethogram. Four objects were placed into the pasture with the mares and foals including a mat, cone, halter, and mounting block. Initial interest of mares in objects was high. Herd mentality highly evident. When one horse spooked at object the whole herd followed. After 5 minutes, majority of mares and foals lose interest in objects. The major general behavior categories observed include: locomotion, comfort, and harem social. Dominance was demonstrated while looking at the objects. Dominance was also demonstrated when a mare wanted to be in a specific place or play with a specific toy, she would pin her ears back, bite, or kick at the other mare. 

  19. The anatomy and importance of project finance for oil and gas developments

    International Nuclear Information System (INIS)

    Whyatt, A.S.

    1992-01-01

    This paper reports that project financing can be of great benefit to oil and gas projects because by separately identifying and securing assets and cashflows it can provide large sums not otherwise accessible to whole projects or to individual companies. Project financing is of interest to members of the SPE because it routinely requires the expertise of petroleum engineers and other professionals to vouch for the viability of petroleum projects and the recoverability of reserves. its essential attraction is that risk analysis and the application of precise professional criteria enable large projects and amounts to be financed, which otherwise might not occur. This is particularly the case when there are a number of participants in a large project, none of which is on its own able to support the finance. The growth in the average size of projects means that an increasing number of projects must be financed in this way or not be able to go forward

  20. Geothermal energy in Italy - its importance, potential and projects

    International Nuclear Information System (INIS)

    Berger, W.

    2005-01-01

    This article discusses the perspectives for the use of geothermal energy in Italy. Starting with an overview of the principles of the use of geothermal energy in general, the article goes on to review Italy's geothermal resources and their relevance to energy supply. Figures are given on the political situation in Italy concerning energy and the rapidly increasing demands made on electricity supply. Political support for renewable energy in Italy is looked at and models for financing projects are examined. Examples of geothermal energy projects are given and the perspectives for further developments in this industry are looked at

  1. Importance of on-time decision making in energy sector based on perspectives: Case study new Stavalj project

    Directory of Open Access Journals (Sweden)

    Zlatanović Dragan M.

    2017-01-01

    Full Text Available Expression "Development conditions and perspectives" became important for numerous analyses in various industrial and social areas. Several strategic documents and studies in last two decades analysed projects with topics on perspectives of future development in Serbia. Various tools are used for development of such documents, based on recent scientific and numerical solutions, thus providing reliable assessment for strategic decision making. Almost all analyses tried to implement the theories and practical experiences through the prism of "sustainable development", which included establishment of most important sustainability parameters. Analysis and ranking presented in this paper considered the potential of the Stavalj coal deposit, near city of Sjenica in Serbia, and feasibility of construction project of new mine and thermal power plant. Basis for analysis was a hybrid assessment model which takes into account principles of sustainable development. The model incorporates quantified SWOT analysis, which applies to active underground mines in Serbia. Special attention was given to the parameters describing potential for development.

  2. The importance of a project level risk management methodology for EU Structural and Investment Funds accession in Romania

    Directory of Open Access Journals (Sweden)

    Nicolae Ciprian

    2017-07-01

    Full Text Available Accessing EU funds is considered to be an important development chance for all type of beneficiaries in Romania: public bodies, nongovernmental organizations and firms. The grounds for this are the amount of funds available per beneficiary and the co financing rate (for example, the investment projects for firms amounted up to 5 million Euro of EU funding at a EU co financing rate up to 70%. As the Romanian responsible authorities strive to conduct a fast and smooth process, the reality shows the funds accession is rather unpredictable and costly, both in terms of time consumption and financial resources. Lots of causes contribute to this situation, amongst which the inefficient risk management conducted, both by the state authorities responsible with the EU funds management and by the beneficiaries of funds. The effects are visible: a poor absorption rate of the EU structural and cohesion funds (79,23% at the level of January 2017 for the 2007-2013 financial period. The authors' research follows the importance that risk management should have in the process of managing and accessing EU funds. The research methodology starts from the responses that 170 people involved in managing EU funded projects within 2007-2013 financial period gave to an online questionnaire carried on in 2016. The focus was to establish if and how risk management methodologies/procedures/guidelines were used within the implementation of projects and in what measure this kind of approach should be compulsory or optional for the financial period 2014-2020. The research methodology further implied the analysis of key issues for projects financing such as: feasibility and opportunity determination, budgeting, projects' evaluation, etc. The main finding of the research is that applicants and beneficiaries need to implement project level risk management methodologies. Based on this, the authors propose a guideline for drafting project level risk management methodologies, that

  3. Investment feasibility tracking: the importance of measuring and tracking the success level of the project during commercialization phase

    Science.gov (United States)

    Saputra, Y. A.; Setyaningtyas, V. E. D.; Latiffianti, E.; Wijaya, S. H.; Ladamay, O. S. A.

    2018-04-01

    Measuring project success level is a challenging activity. This area of works has attracted many researchers to look deeper into the method of measurement, success factor identification, risk management, and many others relevant topics. However, the project management scope is limited until the project handover stage. After a project handover, the control of a project management changes from Project Management Team to the project owner/commercialization team. From an investor’s point of view, the success of a project delivery needs to be followed by the success of commercialization phase. This paper aims to present an approach on how we track and measure the progress and success level of a project investment in the commercialization phase. This is an interesting topic which probably often being forgotten in many practical case. Our proposed concept modify Freeman and Beale concept by estimating the variance between the Planned Net Present Value / Annual Worth (as it is in the Feasibility Study Document) and the Actual Net Present Value / Annual Worth (until the point time of evaluation). The gap will lead us to the next analysis and give us some important information, especially exposing whether our project investment performs better than the planning or underperformed. Some corrective actions can be suggested based on the provided information. Practical cases to exercise the concept is also provided and discussed; one case in a property sector in the middle of commercialization phase, and another case in a Power Plant investment approaching the end of commercialization phase.

  4. Important project financing by issue of bonds in the Federation of Bosnia and Herzegovina

    Directory of Open Access Journals (Sweden)

    Lazar Dreč

    2016-11-01

    Full Text Available This article deals with the development of the Federation of Bosnia and Herzegovina based on the opening of infrastructure facilities for which funding is proposed to incorporate the issue of securities, primarily government bonds because there is a real basis for its demand deriving by banks, citizens and other organizations and institutions. The basic conditions for the functioning model of financing development and strategic projects by issuing securities herein include: a accelerate reforms and create the legal framework that will allow the establishment of important missing institutions for the business sector, b more efficient functioning of the executive and legislative bodies in Bosnia and Herzegovina on creating a favourable business environment, c the implementation of identified strategic commitment from all levels of government in relation to the creation of a single economic space, labour market, harmonization of entity policies and other policies that influence the overall business environment, d the development of infrastructure projects and power facilities, and e the inclusion of private funding and knowledge aimed at improving the construction and management of roads.

  5. Important accounting issues for carbon dioxide capture and storage projects under the UNFCCC

    International Nuclear Information System (INIS)

    Haefeli, S.; Bosi, M.; Philibert, C.

    2005-01-01

    Carbon dioxide capture and storage (CCS) provides options for making continued use of fossil fuels more compatible with pollution abatement policies. This paper evaluated policy issues related to CCS, with particular focus on the geological sequestration of carbon dioxide (CO 2 ) into geological storage sites. Before any carbon dioxide (CO 2 ) CCS activities can be included in the portfolio of climate change mitigation activities, several issues need to be resolved such as the development of appropriate accounting and baselines rules and monitoring modalities. Guidance and policies on baselines and the accounting of emission reductions are critical to ensure that CCS projects can benefit from CO 2 markets and are recognized under various mitigation schemes. This paper examined the major issues that should considered along with changes to current accounting approaches. Issues that need to be addressed in order to prepare national inventories for the inclusion of CCS under the United Nations Framework Convention on Climate Change (UNFCCC) and emission reduction schemes such as the European greenhouse gas emissions trading scheme were first presented, followed by an examination of CCS issues under project-based mechanisms such as the Kyoto Protocol's Clean Development Mechanism. The importance of clear definitions and monitoring guidelines for the proper accounting of CCS were also highlighted. 12 refs., 2 figs

  6. Importance of ensembles in projecting regional climate trends

    Science.gov (United States)

    Arritt, Raymond; Daniel, Ariele; Groisman, Pavel

    2016-04-01

    We have performed an ensemble of simulations using RegCM4 to examine the ability to reproduce observed trends in precipitation intensity and to project future changes through the 21st century for the central United States. We created a matrix of simulations over the CORDEX North America domain for 1950-2099 by driving the regional model with two different global models (HadGEM2-ES and GFDL-ESM2M, both for RCP8.5), by performing simulations at both 50 km and 25 km grid spacing, and by using three different convective parameterizations. The result is a set of 12 simulations (two GCMs by two resolutions by three convective parameterizations) that can be used to systematically evaluate the influence of simulation design on predicted precipitation. The two global models were selected to bracket the range of climate sensitivity in the CMIP5 models: HadGEM2-ES has the highest ECS of the CMIP5 models, while GFDL-ESM2M has one of the lowestt. Our evaluation metrics differ from many other RCM studies in that we focus on the skill of the models in reproducing past trends rather than the mean climate state. Trends in frequency of extreme precipitation (defined as amounts exceeding 76.2 mm/day) for most simulations are similar to the observed trend but with notable variations depending on RegCM4 configuration and on the driving GCM. There are complex interactions among resolution, choice of convective parameterization, and the driving GCM that carry over into the future climate projections. We also note that biases in the current climate do not correspond to biases in trends. As an example of these points the Emanuel scheme is consistently "wet" (positive bias in precipitation) yet it produced the smallest precipitation increase of the three convective parameterizations when used in simulations driven by HadGEM2-ES. However, it produced the largest increase when driven by GFDL-ESM2M. These findings reiterate that ensembles using multiple RCM configurations and driving GCMs are

  7. THE IMPORTANCE OF PROJECT MANAGEMENT IN FUNDRAISING FOR MUNICIPAL ADMINISTRATION

    Directory of Open Access Journals (Sweden)

    Ivan Coriolano Barros Durand Junior

    2014-09-01

    Full Text Available It is the constant growth of the public administration challenges in meeting the huge demand generated by the needs in education, health, housing, infrastructure and social assistance,which can rarely be met only by the usual collection of fees of the municipalities. Hence, and in order to properly document the uses of public resources, the Federal Government adopted a new instance on the release of public funds to meet the demands of the municipalities by requiring the production of projects. Thus, mechanisms have been developed in order to receive and review projects developed in municipal levels.

  8. Europe's gas imports via pipelines. Projects and safety aspects; Europas Gasimporte durch Pipelines. Projekte und Sicherheitsaspekte

    Energy Technology Data Exchange (ETDEWEB)

    Goetz, R.

    2008-08-15

    By the year 2030 Europe's gas imports will have risen to approximately 200 bn m{sup 3}, necessitating the installation of new pipelines and LNG terminals. The largest growth in imports is not expected from Russia but from Africa and the Near East. An analysis of projected pipelines demonstrates these regions' contribution to securing Europe's gas supply. Because they help to establish market dominance or to fend off potential competitors these pipelines also serve corporate strategies. The most reliable supply will continue to come from Norway. By contrast, gas imports via pipelines from North Africa, Russia and the Persian Gulf all carry high risks of approximately the same degree. The greatest risks are associated with gas imports from the Caspian Sea.

  9. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  10. E-Learning as an Important Component in “Blended Learning” in School Development Projects in Norway

    OpenAIRE

    Aasen, Ann Margareth

    2013-01-01

    E-learning is an important component in ཿblended learning࿝ in all of SePU`s projects and is used for additional education and development of competences. Blended learning is defined as learning facilitated by the effective combination of different modes of delivery, models of teaching, styles of learning, and based on transparent communication among all parties involved in development competences. In general, one of the challenges with improving the workplace is linked to employee training an...

  11. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  12. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  13. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  14. Analysis of soybean production and import trends and its import factors in Indonesia

    Science.gov (United States)

    Ningrum, I. H.; Irianto, H.; Riptanti, E. W.

    2018-03-01

    This study aims to analyze the factors affecting soybean imports in Indonesia and to know the trend and projection of Indonesian soybean production as well as the import in 2016-2020. The basic method used in this research is the description analysis method. The data used are secondary data in the form of time series data from 1979-2015. Methods of data analysis using simultaneous equations model with 2SLS (Two Stage Least Square) method and Trend analysis. The results showed that the factors affecting soybean imports in Indonesia are consumption and production. Consumption has positive effect while production is negatively affected. The percentage changed in soybean imports is greater than the percentage change in consumption and production of soybeans. Consumption is positively influenced by imports and production, while production is influenced positively by consumption and negative by imports. The production trend of soybean in 2016-2020 has a tendency to increase with a percentage of 11.18% per year. Production in 2016 is projected at 1.110.537 tons while in 2020 it will increase to 1,721,350 tons. The import trend in 2016-2020 has a tendency to increase with an average percentage of 4.13% per year. Import in 2016 is projected at 2.224.188 tons while in 2020 it will increase to 2.611.270 tons.

  15. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  16. Why are small scale demonstration projects important for the future of CCS?

    Science.gov (United States)

    Leetaru, H. E.; Bauer, R. A.; McBride, J. H.; Freiburg, J. T.; Greenberg, S. E.

    2017-12-01

    Carbon Capture and Storage (CCS) is moving toward large-scale commercial projects and the U.S. Department of Energy is supporting a new CarbonSAFE initiative to assist in the development of a 50 million tonnes geologic storage project. This type of large commercial CCS project will rely on lessons learned from smaller DOE CCS projects such as the Illinois Basin-Decatur Project (IBDP) and the Illinois Industrial Carbon Capture and Storage (IL-ICCS) Project located one mile north of IBDP. Over a three year period ending 2014 IBDP injected almost one million tonnes of CO2 into the Mt. Simon Sandstone, and the IL-ICCS project which commenced injection in 2017 will inject another four million tonnes over a four year period. The IBDP has recorded microseismic events within the study area through continuous downhole seismic monitoring before, during, and after injection. Monitoring shows that microseismicity increased during injection and originate not only in the Cambrian Mt. Simon Sandstone (the target reservoir), but also in the underlying Argenta clastics and deeper Precambrian igneous rocks as SW-NE elongate clusters aligned in strike to the maximum in situ stress direction. An interpretation of site 3D seismic reflection data suggests that much of the microseismicity is proximal to interpreted faults that extend from the basement up into the lowermost Mt. Simon strata. The faults proximally associated with microseismic activity are oriented parallel with respect to the maximum stress direction. The seismic monitoring of the IBDP indicate that the assessment of induced seismic potential associated with commercial-scale CCS requires not only identification of a suitable reservoir and its petrophysical characteristics, but also the extent and orientation of existing faults and their relation to regional stress orientation. Assessment of regional fault orientation using 3D seismic reflection data can be extremely useful to understanding the risks of induced seismicity

  17. The Importance of Ecology-Based Nature Education Project in Terms of Nature Integration and Understanding the Human-Ecosystem Relationship

    Science.gov (United States)

    Meydan, Ali

    2011-01-01

    The aim of this project is to define the importance of 12-day ecology-based education training upon integration with nature and understanding the human-ecosystem relationship. In accordance with this purpose, there has been collected some survey data interviewing with the participants of "Lake Beysehir National Park and Ecology-based Nature…

  18. Molecular transduction mechanisms in ACTH-induced grooming

    NARCIS (Netherlands)

    Gispen, W.H.; Colbern, D.; Spruijt, B.M.

    1988-01-01

    Intraventricular administration of ACTH1-24 induces excessive grooming in the rat. Ethogram analysis shows that the peptide does not alter grooming behavior seen in a novel box, but that it prolongs the duration of the grooming bout. Extensive structure-activity studies have been performed which

  19. Fabrication and quality assurance of some important components and sub-assemblies for Prototype Fast Breeder Reactor (PFBR) project

    International Nuclear Information System (INIS)

    Dutta, N.G.; More, S.S.

    2010-01-01

    Bharatiya Nabhikiya Vidyut Nigam (BHAVINI) is engaged in construction of 500 MWe prototype fast breeder reactor (PFBR) at Kalpakkam, Chennai. In this very important and prestigious national programmed M/s Kay Bouvet Engg. Pvt. Ltd. (M/s KBEPL) Satara is contributing in a major way by supplying many important sub-assemblies. M/s KBEPL is engaged in manufacturing, quality assurance and supply of many subassemblies of PFBR like under water trolley (UWT), shielding door, container and container storage rack (CSR), vessel in fuel transfer cell (FTC), personnel air lock (PAL), emergency air lock (EAL) and material air lock (MAL), absorber rod drive mechanism (ARDM) flask assembly and carriage in MAL etc. Two partition doors and four nos. of embedded parts (SS 304L) have already been supplied to Bhavini. The paper deals with manufacturing and Q.A. activities being carried out for supply of these important assemblies to PFBR projects. (author)

  20. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  1. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  2. Importance of projections, magnifications, and roentgen techniques in the evaluation of obstructions

    International Nuclear Information System (INIS)

    Sones, F.M. Jr.

    1982-01-01

    The authors describe their own technique for coronary angiography, using equipment which facilitates making exposures in craniocaudal or caudo-cranial projections in varying degrees of right or left obliquity up to 60 degrees. Each diagnostic problem must be approached on an individual basis but the usual procedure is two injections into the right coronary artery made in appropriate right and left anterior oblique projections, and four or five injections into the left coronary artery made in appropriate right and left anterior oblique projections. Decisions regarding the conduct of each study must be based on the angiographer's ability to observe and interpret the results of each injection with a properly designed television chain which presents exactly the same image as that being recorded by the cine camera. The problem of differentiating between organic obstruction and functional spasm is discussed and the magnification technique is described. (Auth./C.F.)

  3. PUBLIC-PRIVATE PARTNERSHIP – THE MOST IMPORTANT MODERN TOOLS OF SUCCESSFUL IMPLEMENTATION OF NATIONAL INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    E. E. Zhukov

    2010-01-01

    Full Text Available Article is devoted to actual problems and prospects of perfection of public private partnership mechanisms at important social and economic investment projects realization. The analysis of foreign practice in the PPP field is carried out. Features of Russian PPP development model are considered. The main difficulties on this way are designated. Such as: absence of the normal competitive environment during the choice of the private partner-investor; absence of the qualified experts in the PPP; imperfect legislative base; corruption of officials, etc. Main offers of perfection of PPP-mechanism in Russia, accounting forthcoming modernization and innovative development of Russian economy are given.

  4. Co-ordinated research project: Ingestion and organ content of trace elements of importance in radiological protection (CRP: E4.30.08). Reference Asian man project, phase 2

    International Nuclear Information System (INIS)

    2000-01-01

    The Second Research Coordination Meeting for the Co-ordinated Research Project (CRP) on 'Ingestion and Organ Content of Trace Elements of Importance in Radiological Protection: Reference Asian Man Project, Phase 2' was held at the China Institute for Radiation Protection (CIRP) in Taiyuan, People's Republic of China. During the first technical Session, an overview of the current status of the CRP was presented by the IAEA technical officer, Dr. Parr, and the responsible officer of the Central Reference Laboratory (NIRS, Japan), Dr. Kawamura. They drew attention to the agreed programme of work, as described in the project documentation, and the timetable foreseen for the CRP as summarized in table 1. In general, they concluded that the achievements of the CRP to-date appear to be good, particularly in relation to sample collection (in most countries) and quality control (the development of appropriate reference materials). However, some aspects of the work appear to be a little behind schedule, particularly (1) the final stages of preparation of total diet samples (because of delays in providing a suitable food blender), (2) the analysis of some of the elements of first priority (because of the non-availability, until now, of suitable analytical reference materials), and (3) in some countries, the collection of autopsy specimens. One country (Malaysia) has experienced considerable difficulties in implementing the project due to the retirement of the former Chief Scientific Investigator. For this reason it was unfortunately not possible for the Malaysian representative to be present at the RCM

  5. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  6. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  7. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  8. Port projects put on hold as coal imports peak

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-15

    UK ports and rail operators have invested heavily to improve available capacity, but now imports are leveling off. In January to May 2007, UK coal imports totalled 19.2 mt, a drop of 6% compared to the same period in 2006. Indigenous production dropped more drastically, 23.8% to 6.62 mt. UK coal demand will be determined by such factors as the Large Combustion Plant Directive. There appears to be a second wave in the 'dash for gas' generation game as gas prices have fallen. Investment at Immingham's terminal has enabled the UK to cope with increased coal imports. ABP is now considering another coal terminal outside the locks at Hull. These plans are outlined in the article. Coal handling at Newcastle is also reported. 3 figs., 1 photos.

  9. Study on the import dues system

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Sung Keun [LG-Caltex Oil Co., Seoul (Korea)

    2000-04-01

    Since October 1979, Korea had implemented a petroleum project fund dues system to actively prepare for unstable international petroleum condition. However, as the size of operating a petroleum project fund was bigger and the influence of government on this fund became powerful, it was inserted in the government tax revenues as a {sup S}pecial account for energy and resource project{sup i}n March 1994 and its name was changed to import dues. In this study, it discusses the facts of import dues system, which exists only in Korea, and its policy directions since this system has been reviewed due to the economic development, liberalization of petroleum industry and inequity between alternative energy sources. 4 tabs.

  10. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  11. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  12. The Importance of a Business Plan when Planning a ...

    African Journals Online (AJOL)

    The Importance of a Business Plan when Planning a Lexicographical Project* ... It is, however, an important step towards the establishment of a dictionary project. The compilation of a dictionary ... AJOL African Journals Online. HOW TO USE ...

  13. We Must Invest in Applied Knowledge of Computational Neurosciences and Neuroinformatics as an Important Future in Malaysia: The Malaysian Brain Mapping Project.

    Science.gov (United States)

    Sumari, Putra; Idris, Zamzuri; Abdullah, Jafri Malin

    2017-03-01

    The Academy of Sciences Malaysia and the Malaysian Industry-Government group for High Technology has been working hard to project the future of big data and neurotechnology usage up to the year 2050. On the 19 September 2016, the International Brain Initiative was announced by US Under Secretary of State Thomas Shannon at a meeting that accompanied the United Nations' General Assembly in New York City. This initiative was seen as an important effort but deemed costly for developing countries. At a concurrent meeting hosted by the US National Science Foundation at Rockefeller University, numerous countries discussed this massive project, which would require genuine collaboration between investigators in the realms of neuroethics. Malaysia's readiness to embark on using big data in the field of brain, mind and neurosciences is to prepare for the 4th Industrial Revolution which is an important investment for the country's future. The development of new strategies has also been encouraged by the involvement of the Society of Brain Mapping and Therapeutics, USA and the International Neuroinformatics Coordinating Facility.

  14. Alternative legacies: Artist projects in history museums & the importance of context

    Directory of Open Access Journals (Sweden)

    Lyndsey Boekenkamp

    2013-06-01

    Full Text Available The primary focus of this paper is to investigate why artists are drawn to working in history museums, and how an artist-driven critique of museum practices encourages dialogue about artistic and historical authority, and the role of the museum. Drawing from the fields of public history, art history, anthropology, and journalism, this study argues that artists play an important role in fostering multiple interpretations within traditional historical and academically informed museum practices. The primary theorists influencing this study include Art Historian, Douglas Crimp and his analysis of postmodernism; Professor of Art Education, Dipti Desai and her theory of ethnographic shift; Modern European Historian, Susan Crane and her theory of disruption or “excess of memory”; English Professor, Bettina Carbonell and her theory of “bearing witness”; and Patricia Romney’s analysis of Russian Philosopher, Mikhail Bakhtin and his theory of dialogism. As an outgrowth of this pre-existing scholarship, this study sought to prove that artists were better positioned to intervene in and manipulate traditional museum practices, not because they helped facilitate shared authority, but because they asserted their own artistic authority in the creation of alternative narratives. Through an analysis comparing Fred Wilson’s installation Liberty/Liberte—shown first in the 2006-2007 exhibition Legacies: Contemporary Artists Reflect on Slavery at the New-York Historical Society, and then in its current placement as part of the Historical Society’s official renovations—this study instead concludes that artists are more than capable of successful interventions in non-art environments – specifically, history museums. However, the context in which the artwork is placed, as well as the conversation between the artist and the institution throughout the duration of any project, has the power to make or break the success of these artist interventions.

  15. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  16. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  17. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  18. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  19. Risk communication importance

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Raquel Dalledone Siqueira da; Andrade, Delvonei Alves de, E-mail: raqueldalledonesiqueira@gmail.com, E-mail: delvonei@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2013-07-01

    Risk Communication has shown its importance in the elaboration of emergency plans in the Chemical industry. In the 90's, the UNEP developed the APELL (Awareness and Preparedness for Emergency at Local Level) plan, a risk management methodology used by dangerous chemical facilities. The methodology comprises the commitment of both Government and the community located in the risk area in the development of the emergency plan. In the nuclear sector, there is no similar methodology developed so far. However, establishing a communication channel between the nuclear segment and the community is essential. In Brazil, the construction of Angra 3 and the RMB (Multi Purpose Reactor) project stand as nuclear initiatives that improve the importance of a good communication to the public. Security issues of these projects are natural sources of concernment to the public, which is aggravated by events such as the Fukushima disaster. Without an effective communication about what means the presence of nuclear plants and reactors in a specific area, the interested public will only have an alarmist vision of the subject, given by those against these facilities. (author)

  20. Risk communication importance

    International Nuclear Information System (INIS)

    Cunha, Raquel Dalledone Siqueira da; Andrade, Delvonei Alves de

    2013-01-01

    Risk Communication has shown its importance in the elaboration of emergency plans in the Chemical industry. In the 90's, the UNEP developed the APELL (Awareness and Preparedness for Emergency at Local Level) plan, a risk management methodology used by dangerous chemical facilities. The methodology comprises the commitment of both Government and the community located in the risk area in the development of the emergency plan. In the nuclear sector, there is no similar methodology developed so far. However, establishing a communication channel between the nuclear segment and the community is essential. In Brazil, the construction of Angra 3 and the RMB (Multi Purpose Reactor) project stand as nuclear initiatives that improve the importance of a good communication to the public. Security issues of these projects are natural sources of concernment to the public, which is aggravated by events such as the Fukushima disaster. Without an effective communication about what means the presence of nuclear plants and reactors in a specific area, the interested public will only have an alarmist vision of the subject, given by those against these facilities. (author)

  1. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  2. Importance of including cultural practices in ecological restoration.

    Science.gov (United States)

    Wehi, Priscilla M; Lord, Janice M

    2017-10-01

    Ecosystems worldwide have a long history of use and management by indigenous cultures. However, environmental degradation can reduce the availability of culturally important resources. Ecological restoration aims to repair damage to ecosystems caused by human activity, but it is unclear how often restoration projects incorporate the return of harvesting or traditional life patterns for indigenous communities. We examined the incorporation of cultural use of natural resources into ecological restoration in the context of a culturally important but protected New Zealand bird; among award-winning restoration projects in Australasia and worldwide; and in the peer-reviewed restoration ecology literature. Among New Zealand's culturally important bird species, differences in threat status and availability for hunting were large. These differences indicate the values of a colonizing culture can inhibit harvesting by indigenous people. In Australasia among award-winning ecological restoration projects, restored areas beyond aesthetic or recreational use, despite many projects encouraging community participation. Globally, restoration goals differed among regions. For example, in North America, projects were primarily conservation oriented, whereas in Asia and Africa projects frequently focused on restoring cultural harvesting. From 1995 to 2014, the restoration ecology literature contained few references to cultural values or use. We argue that restoration practitioners are missing a vital component for reassembling functional ecosystems. Inclusion of sustainably harvestable areas within restored landscapes may allow for the continuation of traditional practices that shaped ecosystems for millennia, and also aid project success by ensuring community support. © 2017 Society for Conservation Biology.

  3. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    these objectives should be like. Requirements and effects of the application of project management The goal of the project management methodology is to assist the manager in all of these elements, but also to provide a uniform way of evaluating his performance as an objective comparison of indicators in all projects that are implemented in the system. Project management methodology Efficient business operations and fulfilling the requests of users, or buyers if business is done for the third parties, require modern planning and management of projects using computers and appropriate software. Given that the project management with the help of network models requires frequent and rapid processing of large amount of data, it is obvious that the application of computers in this area is of utmost importance. System of reporting on project implementation To achieve effective monitoring, control and implementation of control actions, it is necessary to organize an effective reporting system that will provide timely and realistic information about the real state of the project, in terms of job performing time, the resources spent and the costs of project implementation. Concept of risk management In any project there are many different risk events by type, the probability of appearance, manner and size of the impact of the project. The process of testing the nature of risk events in the project as well as their potential impact on the outcome of the project and their interdependence are realized through the risk analysis. Conclusion Methodologies of project management surged from these differences, when it became apparent that a unified approach to the problem of project managing does not meet the unique project requirements. Taking into account that in the future projects will become more complex and that the methodology of project management will be required to deal with such projects, a proper selection of methodology within the organization is extremely important.

  4. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  5. The Swedish satellite project Viking

    International Nuclear Information System (INIS)

    Hultqvist, B.

    1990-01-01

    The Swedish satellite project Viking is described and related to earlier missions. Some new operational characteristics are discussed, including the real-time data analysis campaigns that were an important part of the project. Some areas of important scientific impact of the project are also described. Viking was specially designed and equipped for investigation of plasma physical acceleration and other processes in the transition region between hot and cold plasma on auroral latitude magnetic field lines

  6. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  7. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  8. Measures of risk importance and their applications

    International Nuclear Information System (INIS)

    Vesely, W.E.; Davis, T.C.; Denning, R.S.; Saltos, N.

    1983-07-01

    This work is part of a project being conducted for the Division of Risk Analysis (DRA) of the Nuclear Regulatory Commission (NRC). The objectives of the project are to evaluate the importances of containment, the different safety functions, and other various contributers as assessed in probabilistic risk analyses and to identify generic conclusions regarding the importances. Effective display of the importances is an important part of these objectives. To address these objectives, measures of risk importance need to be first identified and then they need to be evaluated for the different risk analyses which have been performed. This report describes the risk importance measures that were defined and were applied to the risk analyses which were performed as part of the Reactor Safety Study Methodology Applications Program (RSSMAP). The risk importance measures defined in this report measure the importance of features not only with regard to risk reduction but also with regard to reliability assurance, or risk maintenance. The goal of this report is not to identify new mathematical formulas for risk importance but to show how importance measures can be interpreted and can be applied

  9. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  10. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  11. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  12. Defining Project Purchasing Activities - Exemplified by the Purchasing Practices in Offshore Wind Farm Projects

    DEFF Research Database (Denmark)

    Lutz, Salla

    and limited learning outcomes from one project to another. Furthermore, the study reveals the importance of a more holistic approach to project purchasing practices by focusing on the entire life cycle of a project. Managerially it helps selling companies to understand the peculiar buying phases...

  13. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  14. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  15. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  16. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  17. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  18. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  19. Project beneficiary participation and behavioural intentions promoting project sustainability: : The mediating role of psychological ownership

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, B.

    It is of great importance that development projects (especially those projects that target improving the livelihood of rural communities) continue to deliver their intended benefits over their intended economic life – we call this ‘project sustainability’. Applying an experimental design, our study

  20. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  1. A highly redundant BAC library of Atlantic salmon (Salmo salar: an important tool for salmon projects

    Directory of Open Access Journals (Sweden)

    Koop Ben F

    2005-04-01

    Full Text Available Abstract Background As farming of Atlantic salmon is growing as an aquaculture enterprise, the need to identify the genomic mechanisms for specific traits is becoming more important in breeding and management of the animal. Traits of importance might be related to growth, disease resistance, food conversion efficiency, color or taste. To identify genomic regions responsible for specific traits, genomic large insert libraries have previously proven to be of crucial importance. These large insert libraries can be screened using gene or genetic markers in order to identify and map regions of interest. Furthermore, large-scale mapping can utilize highly redundant libraries in genome projects, and hence provide valuable data on the genome structure. Results Here we report the construction and characterization of a highly redundant bacterial artificial chromosome (BAC library constructed from a Norwegian aquaculture strain male of Atlantic salmon (Salmo salar. The library consists of a total number of 305 557 clones, in which approximately 299 000 are recombinants. The average insert size of the library is 188 kbp, representing 18-fold genome coverage. High-density filters each consisting of 18 432 clones spotted in duplicates have been produced for hybridization screening, and are publicly available 1. To characterize the library, 15 expressed sequence tags (ESTs derived overgos and 12 oligo sequences derived from microsatellite markers were used in hybridization screening of the complete BAC library. Secondary hybridizations with individual probes were performed for the clones detected. The BACs positive for the EST probes were fingerprinted and mapped into contigs, yielding an average of 3 contigs for each probe. Clones identified using genomic probes were PCR verified using microsatellite specific primers. Conclusion Identification of genes and genomic regions of interest is greatly aided by the availability of the CHORI-214 Atlantic salmon BAC

  2. On the importance of PURE - Public Understanding of Renewable Energy

    Energy Technology Data Exchange (ETDEWEB)

    Broman, Lars; Kandpal, Tara C.

    2013-09-15

    Public understanding of science (PUS) is a central concept among science communicators. Public understanding of renewable energy (PURE) is proposed as an important sub-concept of PUS. The aim of this paper is to interest and invite renewable energy scientists to join a PURE research project. Four separate important questions for a PURE research project can be identified: (A) Is PURE important? (B) Which issues of PURE are the most important ones, according to renewable energy scientists? (C) What understanding of renewable energy has the general public today, worldwide? (D) How to achieve PURE?.

  3. The Strategic Importance of Balochistan

    Science.gov (United States)

    2011-06-01

    projects require augmentation from skilled Punjabi labor. Militarily, it is important from a logistical standpoint as it provides a...Balochistan to a newly independent Greater Balochistan, but also their Pashtun regions need to join Afghanistan, leaving the Punjabi and Sindhi regions to

  4. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  5. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  6. Project Management Effectiveness: the choice - formal or informal controls

    Directory of Open Access Journals (Sweden)

    Jon Heales

    2007-12-01

    Full Text Available Development failures and runaway projects in the information systems (IS area can result in substantial losses to organizations, either financially or to a company’s reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.

  7. Pelagic Project Mauritania 2005-2006

    NARCIS (Netherlands)

    Heessen, H.J.L.; Tjoe-Awie, P.J.; Haan, de D.; Ybema, M.S.

    2007-01-01

    The Pelagic Project Mauritania 2005-2006 was the continuation of two earlier, but similar, projects for the years 1998-2001 and 2002-2004. The project was carried out in cooperation between IMARES and IMROP and had as most important objectives to further the assessment of small pelagic species,

  8. The importance of project networking for the replacement research reactor

    International Nuclear Information System (INIS)

    Whitbourn, G.

    2003-01-01

    When the HIFAR research reactor was commissioned in 1958 it was both constructed and regulated by the then Australian Atomic Energy Commission. The situation now is much more complicated, with an independent regulator, The Australian Radiation Protection and Nuclear Safety Agency (ARPANSA) and oversight by national security agencies and the Australian Safeguards and Non proliferation Organisation (ASNO). In July 2000 ANSTO contracted INVAP SE a suitably qualified and experienced nuclear organisation based in Argentina to provide the Replacement Research Reactor (RRR). INVAP subcontracted an Australian entity, a joint venture between John Holland and Evans Deakin Industries (JHEDI) to provide resources in Australia. There is an international network of over 100 subcontractors providing services, products and materials to INVAP and JHEDI and a significant number of contractors providing project support services to ANSTO. The interaction of all these entities to provide the RRR is a significant networking challenge, involving a complex network of legal, contractual and functional relationships and communication processes

  9. [Theme: Achieving Quality Laboratory Projects.[.

    Science.gov (United States)

    Shinn, Glen C.; And Others

    1983-01-01

    The theme articles present strategies for achieving quality laboratory projects in vocational agriculture. They describe fundamentals of the construction of quality projects and stress the importance of quality instruction. (JOW)

  10. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  11. APRI - Accident Phenomena of Risk Importance. Final Report; APRI - Accident Phenomena of Risk Importance. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Frid, W. [Swedish Nuclear Power Inspectorate, Stockholm (Sweden); Hammar, L.; Soederman, E. [ES-konsult, Stockholm (Sweden)

    1996-12-01

    The APRI-project started in 1992 with participation of the Swedish Nuclear Power Inspectorate (SKI) and the Swedish utilities. The Finnish utility TVO joined the project in 1993. The aim of the project has been to work with phenomenological questions in severe accidents, concentrating on the risk-dominating issues. The work is reported in separate sub-project reports, the present is the final report of the methodological studies as well as a final report for the total project. The research has led to clarifications of the risk complex, and ameliorated the basis for advanced probabilistic safety analyses, specially for the emission risks (PSA level 2) which are being studied at the Swedish plants. A new method has been tried for analysis of complicated accident courses, giving a possibility for systematic evaluation of the impact of different important phenomena (e.g. melt-through, high pressure melt-through with direct heating of the containment atmosphere, steam explosions). In this method, the phenomena are looked upon as top events of a `phenomena-tree`, illustrating how various conditions must be met before the top-event can happen. This method has been useful, in particular for applying `expert estimates`. 47 refs.

  12. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  13. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  14. Comparative analysis of milk yield and reproductive traits of Holstein-Friesian cows born in Turkey or imported from Italy and kept on farms under the Turkish-ANAFI project

    Directory of Open Access Journals (Sweden)

    Yavuz Akbas

    2010-01-01

    Full Text Available This research investigated the milk yield, reproductive traits and productive life of Holstein-Friesian cows born in Turkeyor imported from Italy and raised on farms involved in the Turkish-ANAFI Project. A total of 2600 records for age at firstcalving, 4733 completed lactation records from 2080 cows, and 1130 productive life (from first calving to disposalrecords from 50 farms in the provinces of I•zmir, Manisa and Aydın under the Turkish-ANAFI Project were evaluated. Leastsquares means for age at first calving, 305-day milk yield, lactation milk yield, lactation duration, days open, days dry,and productive life were 28.2 months, 6232 kg, 6829 kg, 336.0 days, 138.0 days, 78.3 days, and 28.9 months, respectively.Corresponding least squares means for cows born in Turkey and imported from Italy were 28.8 and 27.6 months(P0.05, 6761 and 6897 kg (Pdays (P0.10, and 21.6 and 36.1 months (Pof Holstein-Friesian cows in herd-book herds under the project in the Aegean Region was satisfactory. However, therewere reproductive problems as shown by the length of days open. Shorter productive life of cows born in Turkey comparedto cows from Italy suggested that breeders tended to cull locally born cows at a younger age but that they tendedto keep imported cows in the herd for a longer period unless serious problems occurred.

  15. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  16. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  17. Analysis of architect’s performance indicators in project delivery process

    Science.gov (United States)

    Marisa, A.

    2018-03-01

    Architect as a professional in the construction industry should possess a good performance in project delivery process. As a design professional, architect has an important role to ensure that the process is well-conducted by delivering a high-quality product for the clients. Thus, analyzing architect’s performance indicators is crucial in the project delivery process. This study aims to analyze the relative importance of architect performance indicators in project delivery process among registered architects in North Sumatera, Indonesia. A total of five indicators that measure architect performance in project delivery process were identified and 110 completed questionnaires were obtained and used for data analysis. A relative importance index is used to rank the relative importance of architect performance indicators. Results indicate that focus on the clients is the most important indicator of architect performance in project delivery process. This study demonstrates project communication as one of crucial indicators perceived by the architects for measuring their performance, and fills a knowledge gap on the importance of identifying the most important indicator for measuring architect performance from their own perspectives which previous studies have overlooked to improve performance assessment in project delivery process.

  18. Project Reptile!

    Science.gov (United States)

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  19. Time for Decarbonization of Conservation and Development Projects? The Political Ecology of Carbon Projects

    Directory of Open Access Journals (Sweden)

    Pierre L. Ibisch

    2015-01-01

    Full Text Available The globe's first carbon projects were designed and implemented approximately 20 years ago following scientific insights that emissions of greenhouse gases needed to be mitigated. Visible in some of these early projects were the important aspects of social governance and local benefit sharing. The projects promised to be a panacea to environmental, social and economic problems in remote rural areas of developing countries. However, it took another decade before a wave of hundreds of carbon projects were launched. Many of the projects were offered under the mechanism of REDD+ (Reducing Emissions from Deforestation and forest Degradation, plus the role of conservation, sustainable forest management and carbon enhancement, as well as under a variety of voluntary schemes and national programs, public-private partnerships, and forestry-based investment initiatives. As decision-makers prepare the Conference of the Parties of the United Nations Framework Convention on Climatic Change in Paris (COP21, Earthscan has released a book entitled `Carbon conflicts and forest landscapes in Africa', edited by Melissa Leach and Ian Scoones. According to the editors, the focus of the book is on what happens on the ground when carbon forestry projects arrive, what types of projects work, and, equally important, what doesn’t work.

  20. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  1. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  2. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  3. Structuring a mega-project

    Energy Technology Data Exchange (ETDEWEB)

    Kutryk, T. [Husky Oil Operations Ltd., Calgary, AB (Canada)

    2004-07-01

    This paper presented an overview of mega-project management. Issues concerning scope, cost and schedule were discussed, with reference to the idea that a choice must be made from the outset as to which of the 3 is a main priority. The importance of preparation and the development of a fully resourced plan was emphasized. The use of the parametric 4-D model was discussed. Lessons that the construction industry may learn from manufacturers were presented along with issues of contract development and the role and importance of the project manager. Issues concerning performance measurement were reviewed, including lagging indicators. Project division factors were also discussed, with reference to data lags, naturally concurrent processes and over the fence units. A case study of Walmart was presented. Project design packages and long lead time items were discussed, as were issues concerning human resources. Functional units were examined in relation to zones of influence and unit integration. Various combinations of zones of influence were presented. Issues concerning span of control and varying relationships within a project were discussed. It was emphasized that great deeds can be accomplished by attracting the best people. tabs., figs.

  4. Themeaning and Role of Projects in contemporary Management

    Directory of Open Access Journals (Sweden)

    Waldemar Walczak

    2010-03-01

    Full Text Available The aim of the paper is to present and explain the important role and meanings of projects for modern organizations. The particular attention was paid on differing project’s features and premises that substantiate incremental interest of project management methodic of diagnosis key conditionality, which has fundamental meaning for correct planning of project venture. Important element of led analysis was presenting and discussing project limitation and key processes related with project preparation phase. A very significant accent of led consideration are recommendations for management practice related with identifying the needs, expectations and stakeholders influence on project success, as well as calling particular attention on benefits gained by organizations due to realized project.

  5. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  6. Behavioural repertoire of working donkeys and consistency of behaviour over time, as a preliminary step towards identifying pain-related behaviours.

    Science.gov (United States)

    Regan, Fran H; Hockenhull, Jo; Pritchard, Joy C; Waterman-Pearson, Avril E; Whay, Helen R

    2014-01-01

    The donkey has a reputation for stoicism and its behavioural repertoire in clinical contexts is under-reported. Lack of understanding of the norms of donkey behaviour and how it may vary over time can compromise use of behavioural measures as indicators of pain or emotional state. The objective of this study was to find out whether the behaviour of working donkeys was influenced by gender, the time of day or differed between days with a view to assessing how robust these measures are for inclusion in a working donkey ethogram. Frequency and consistency of postural and event behaviours were measured in 21 adult working donkeys (12 females; 9 males). Instantaneous (scan) and focal sampling were used to measure maintenance, lying, ingestive and investigative behaviours at hourly intervals for ten sessions on each of two consecutive days. High head carriage and biting were seen more frequently in male donkeys than females (Pdonkeys (Pdonkeys expressed an extensive behavioural repertoire, although some differences in behaviour were evident between genders. While most behaviours were consistent over time, some behaviours were influenced by time of day. Few behaviours differed between the two test days. The findings can be used to inform the development of a robust, evidence-based ethogram for working donkeys.

  7. Constrained bayesian inference of project performance models

    OpenAIRE

    Sunmola, Funlade

    2013-01-01

    Project performance models play an important role in the management of project success. When used for monitoring projects, they can offer predictive ability such as indications of possible delivery problems. Approaches for monitoring project performance relies on available project information including restrictions imposed on the project, particularly the constraints of cost, quality, scope and time. We study in this paper a Bayesian inference methodology for project performance modelling in ...

  8. Evaluation of the RAIN project

    International Nuclear Information System (INIS)

    Stuanes, A.; Dickson, W.; Jenkins, A.; Rasmussen, L.; Stordal, F.

    1991-11-01

    This report presents a scientific assessment of the RAIN project. It describes the main hypotheses tested and the applied methods. The major results of the research are highlighted and discussed, and they are placed in the perspective of national and international acid rain research. An important part of the RAIN project has been to provide information to the public about the acid rain problem, and in this way it has performed an important background role in influencing political decisions and legislation. The RAIN project is regarded as a cost effective research effort, and the novel approach and capital investment will enable further manipulation studies at these sites in the future. It is recommended that the project is continued in the immediate future, with some modification to answer specific questions resulting from the collected data. 24 refs., 6 figs., 1 tab

  9. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  10. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  11. The Piniariarneq Project: Inughuit hunters map their important hunting areas

    DEFF Research Database (Denmark)

    Johansen, Kasper Lambert; Flora, Janne; Oberborbeck Andersen, Astrid

    industrialisation of the High Arctic in the near future. Mapping of important resource areas of local, human communities have also been conducted on numerous occasions, but has generally received much less attention, and often results from such efforts are difficult to integrate with biological data. Here, we...

  12. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  13. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  14. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  15. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  16. Characterizing Density and Complexity of Imported Cargos

    Energy Technology Data Exchange (ETDEWEB)

    Birrer, Nathaniel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Divin, Charles [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glenn, Steven [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Martz, Harry [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-08-01

    X-ray inspection systems are used to detect radiological and nuclear threats in imported cargo. In order to better understand performance of these systems, system imaging capabilities and the characteristics of imported cargo need to be determined. This project involved calculation of the modulation transfer function as a metric of system imaging performance and a study of the density and inhomogeneity of imported cargos, which have been shown to correlate with human analysts, threat detection performance.

  17. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  18. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  19. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  20. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  1. History And Importance Of Graphic Design

    OpenAIRE

    Lyallya, Kirill

    2016-01-01

    This thesis is about history and importance of graphic design in different periods, from ancient times until today. The features inherent in different countries are considered. The techniques, basic methods for creating projects and computer software that designers have used are mentioned. In order to understand the importance of graphic design in our lives, it is considered from the side of ordinary people, how it manifests itself in daily lives and how it affects business. The thesis provid...

  2. Stakeholder Salience in ERP Projects

    OpenAIRE

    Salhotra, Eashan

    2014-01-01

    The aim of this study is to examine stakeholder involvement in an Enterprise Resource Planning (ERP) System project that involves implementation and improvement of the implemented system. The study targets stakeholders, their classification, and their degree of importance during different phases of an ERP project life cycle, i.e. planning, implementation, stabilisation and improvement. The study shows that stakeholder involvement and their salience vary along the ERP project life cycle a...

  3. Natural gas purchasing for cogeneration projects

    International Nuclear Information System (INIS)

    Kubacki, J. Jr.

    1992-01-01

    This paper reports on the primary cost component for most gas-fired cogeneration or on-site power projects, cost of natural gas. Often gas comprises 50 to 65% of total project costs over the life of the project. Thus it is very important to focus on natural gas sourcing, pricing, transportation and storage. This important task should not be blindly delegated to a gas supplier. The end user must develop a gas strategy that results in the most cost-effective burnertip price. Long-term natural gas supplies are usually source from the three major producing regions: Mod-Continent, Gulf Coast, and Western Canada. A well-reasoned gas strategy must include: determination of transportation and distribution options from the project site to potential gas sources (including direct interconnection of the project to interstate pipelines); acquisition of competitive gas bids from suppliers in appropriate regions; negotiation of potential discounts from interstate pipelines and local distribution companies (LDCs); fine-tuning project economics by, for example, using storage to maximize transportation load factor; and pricing mechanisms that meet economic parameters of the project. This paper uses a hypothetical project in the Midwest to examine the major factors in devising a cost-effective natural gas sourcing

  4. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  5. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  6. Reflexivity in performative science shop projects

    OpenAIRE

    Beunen, R.; Duineveld, M.; During, R.; Straver, G.H.M.B.; Aalvanger, A.

    2012-01-01

    Science shop research projects offer possibilities for universities to engage with communities. Many science shop projects directly or indirectly intend to empower certain marginalised groups or interests within a decision-making process. In this article we argue that it is important to reflect on the role and position the researchers have in these projects. We present three science shop projects to illustrate some of the dilemmas that may arise in relation to citizen empowerment, democracy, ...

  7. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  8. Coordinated research projects (CRP). Coordinated research project (CRP)

    International Nuclear Information System (INIS)

    Takagi, Hidekazu; Koike, Fumihiro; Nakamura, Nobuyuki

    2013-01-01

    In the present paper, the contribution of Japanese scientists in coordinated research projects on thermonuclear fusion. Representative subjects taken in seven projects are the precise computation of theoretical data on electron-molecule collisions in the peripheral plasma, the computation of spectroscopic data of multi-charged tungsten ions, the spectroscopic measurement of multi-charged tungsten ions using an ion trap device, the development of collisional-radiative model for plasmas including hydrogen and helium, the computational and theoretical studies on the behavior of tungsten and beryllium in the plasma-wall interaction, the study on the property of dusts generated in fusion devices. These subjects are those of most important issues in ITER. (author)

  9. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  10. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  11. Kansas Advanced Semiconductor Project: Final Report

    International Nuclear Information System (INIS)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-01-01

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  12. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network of Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasizes the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting the NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper

  13. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  14. Factors Affecting Project Governance Of Arusha Archdiocesan Food Security And Livelihood Project In Monduli District Tanzania.

    Directory of Open Access Journals (Sweden)

    Kisame Deogratious

    2015-06-01

    Full Text Available Abstract This research project dealt with the factors affecting governance of Food security and livelihood projects a case study of the Food security and livelihood project that was implemented by AAIDRO in Monduli district and included 60 respondents all together. The specific objectives of this study intended to access the Leadership styles that are being used in project governance. The findings of the study indicated that 91.7 of the respondents were in favor of their leaders project governance styles it was portrayed that participative leadership style was being used by the leaders for project governance. Based on a sample of 60 project members this study had confirmed that a project leaders leadership roles like mentor facilitator innovator and coordinator are important in influencing project governance effectiveness which includes team mission goal achievement and empowerment open and honest communication

  15. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  16. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  17. Theory of Abelian projection

    International Nuclear Information System (INIS)

    Ogilvie, M.C.

    1999-01-01

    Analytic methods for Abelian projection are developed. A number of results are obtained related to string tension measurements. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The methods used emphasize that the projected theory is derived from the underlying non-Abelian theory rather than vice versa. In general, the choice of subgroup used for projection is not very important, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements. Two other issues, Casimir scaling and the conflict between projection and critical universality, are also discussed. copyright 1999 The American Physical Society

  18. Diversite et importance socio-economique des services ...

    African Journals Online (AJOL)

    Ecosystems and protected areas provide important ecosystem services to local communities. These services are incentives for natural resources conservation. The current project, conducted in Pendjari Biosphere Reserve, northern Benin aimed at assessing ecosystem services and their contribution to local people ...

  19. A Europe-wide system for assessing the quality of rivers using macroinvertebrates: the AQEM Project* and its importance for southern Europe (with special emphasis on Italy

    Directory of Open Access Journals (Sweden)

    Joanna L. KEMP

    2001-09-01

    Full Text Available The AQEM Project aims to develop a Europe-wide system for monitoring the ecological quality of rivers using macroinvertebrates, to satisfy the requirements of the EU Water Framework Directive. Three main types of anthropogenic perturbation are being investigated: morphological degradation, water (organic pollution and acidification (the last is not under investigation in Italy. The selection of reference and impaired study sites is discussed. Particular attention is paid to the problems encountered when defining reference conditions. The initial stages of the project highlighted the lack of a Europe-wide definition of river types. The future development of such a typology from the AQEM database is discussed. The standard AQEM data gathering methods are presented, from background information about sites to the microhabitat-based macroinvertebrate sampling method. The extended fieldwork methods used in Italy are described. These included the separate analysis of the invertebrate assemblages from each replicate, the recording of additional microhabitat variables for each replicate and the completion of large-scale survey techniques for each site (including RHS. The extended method was designed to enhance the important ecological information available from the dataset, particularly relevant in Italy where significant gaps exist in the taxonomic and ecological knowledge of many macroinvertebrate taxa. Preliminary and expected findings are presented, including examples of the range and habitat selection of two species of Ephemeroptera endemic to Italy, as well as data relating to the number of taxa found at a site with increasing numbers of microhabitat replicates taken. The importance of the AQEM Project not only for biomonitoring, but also for ecology, taxonomy and conservation, in Italy and for the south of Europe in general, is emphasised.

  20. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  1. Fuzzy decision analysis for project scope change management

    Directory of Open Access Journals (Sweden)

    Farshad Shirazi

    2017-09-01

    Full Text Available It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incident, and thus, should be kept away from the project. By considering this concept, in this paper, we discuss scope change and managing scope and fuzzy analytical hierarchy process is used in selecting the best strategy to manage scope change in projects.

  2. Engaging clinicians in health informatics projects.

    Science.gov (United States)

    Caballero Muñoz, Erika; Hullin Lucay Cossio, Carola M

    2010-01-01

    This chapter gives an educational overview of: * The importance of the engagement of clinicians within a health informatics project * Strategies required for an effective involvement of clinicians throughout a change management process within a clinical context for the implementation of a health informatics project * The critical aspects for a successful implementation of a health informatics project that involves clinicians as end users * Key factors during the administration of changes during the implementation of an informatics project for an information system in clinical practice.

  3. Fuzzy decision analysis for project scope change management

    OpenAIRE

    Farshad Shirazi; Hamed Kazemipoor; Reza Tavakkoli-Moghaddam

    2017-01-01

    It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incid...

  4. Financing power projects in emerging markets

    International Nuclear Information System (INIS)

    Matsumoto, G.T.

    1996-01-01

    Financing for power generation projects in the developing countries of the world has been provided by the United States Export-Import Bank. The loans provided by its new Project Finance Division, totalling $8.3 billion are described. The future of project financing for the power generation industry should, it is argued, rest not with government financing agencies, but with private sector financial markets. (UK)

  5. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  6. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  7. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  8. The Engineering Project as Story and Narrative

    DEFF Research Database (Denmark)

    Henriksen, Lars Bo

    2012-01-01

    that the traditional project management tools are not always sufficient when it comes to managing engineering projects. In this chapter, an engineering project is examined, and it turns out that the language, the stories, and the narratives connected to the project is of greater importance to the engineers than...... the formal project management tools that were offered to the engineers. It also turns out that the term “project” could itself be a problem when it comes to fulfilling the project goals. Therefore, it is concluded that when working on engineering projects, language, stories, and narratives are just...

  9. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network for Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasises the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper. (author). 2 refs, 6 figs

  10. A Real-World Project for a Desktop Publishing Course.

    Science.gov (United States)

    Marsden, James D.

    1994-01-01

    Describes a project in a desktop publishing course in which students work with nonprofit and campus organizations to design brochures that fulfill important needs. Discusses specific tools students use. Describes the brochure project, project criteria, clients, text and graphics for the project, how to evaluate the project, and guidelines for…

  11. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  12. MORE - Management of requirements in NPP modernisation projects. Project report 2006

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Thunem, H.P.J. [IFE (Norway); Valkonen, J. [VTT (Finland)

    2007-02-15

    The purpose of the report is to document the work and related activities in the period January 1 December 31 in 2006, including dissemination activities. The work in this period has been concentrated on further research for adopting an approach for dependable requirements engineering and its supporting tool. The majority of the efforts in 2006, however, was spent on making the researchers, developers, utilities and licensees more aware of the importance of the area of requirements engineering, and in that respect organising an international seminar on dependable requirements engineering. This seminar was defined as a deliverable in the Activity Plan for 2006 and became also the most important deliverable for 2006. Therefore, this report naturally features a detailed summary of the seminar, which proved to be a true success and at the same time a door opener for more initiatives within the topic, proposed by several participants. More efforts within dissemination of the background and objectives of the project MORE within the nuclear community and towards NPPs that do carry out modernisation projects continued to be one important focus. (au)

  13. MORE - Management of requirements in NPP modernisation projects. Project report 2006

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Thunem, H.P.J.; Valkonen, J.

    2007-02-01

    The purpose of the report is to document the work and related activities in the period January 1 December 31 in 2006, including dissemination activities. The work in this period has been concentrated on further research for adopting an approach for dependable requirements engineering and its supporting tool. The majority of the efforts in 2006, however, was spent on making the researchers, developers, utilities and licensees more aware of the importance of the area of requirements engineering, and in that respect organising an international seminar on dependable requirements engineering. This seminar was defined as a deliverable in the Activity Plan for 2006 and became also the most important deliverable for 2006. Therefore, this report naturally features a detailed summary of the seminar, which proved to be a true success and at the same time a door opener for more initiatives within the topic, proposed by several participants. More efforts within dissemination of the background and objectives of the project MORE within the nuclear community and towards NPPs that do carry out modernisation projects continued to be one important focus. (au)

  14. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  15. The project scientist's role in scientific spacecraft project management. M.S. Thesis - George Washington Univ.

    Science.gov (United States)

    Eller, E. L.

    1976-01-01

    The project scientists is in a position which rates very high in terms of behavioral study recommendations. His influence over objectives is generally considered to be important. He is highly autonomous in a moderately coordinated environment. He has diverse managerial and technical functions and the performance of these functions require him to grow beyond his role as an experimenter. However, the position within the line organization for those interviewed is also very stimulating, rating almost as high by the same criteria. The role of project scientist may not be the dominant means of professional growth for the experienced scientific investigators. The influence which the project scientist exerts on the project and the stimulation of that position for him are determined largely by his position outside the defined project scientist role. The role of the project scientist is changing because the environment of those who become project scientists is changing.

  16. Project control of WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Buende, R.; Gottschewsky, M.; Heinrich, S.

    2001-01-01

    WENDELSTEIN 7-X (W7-X) is an experimental stellarator presently under construction at the new branch of IPP Garching at Greifswald. Since its beginning in 1996, the project W7-X Construction has been incorporating a comprehensive project control activity to assure the plant is constructed according to schedule and budget. The working fields of the project control--organization, planning and controlling--are described together with the relevant boundary conditions of the project. The activities in these fields are highlighted and an overview of the status of the project is given with emphasis on the components on the time-critical path. As conclusions some important issues for the future of the project are specified

  17. The human genome project

    International Nuclear Information System (INIS)

    Worton, R.

    1996-01-01

    The Human Genome Project is a massive international research project, costing 3 to 5 billion dollars and expected to take 15 years, which will identify the all the genes in the human genome - i.e. the complete sequence of bases in human DNA. The prize will be the ability to identify genes causing or predisposing to disease, and in some cases the development of gene therapy, but this new knowledge will raise important ethical issues

  18. Interconversion of Fischer and Zig-Zag Projections Learning ...

    Indian Academy of Sciences (India)

    IAS Admin

    Stereochemistry, conforma- tional analysis, hands-on learn- ing, Fischer projections, zig-zag projection, C–C bond rotations. Interconversion of Fischer and Zig-Zag Projections. Learning Stereochemistry with the Help of Hands. Visualization of molecules in three dimensions is an important aspect of organic chemistry.

  19. Behavioral Pattern of Endemic Sri Lanka Grey Hornbill (Ocyceros gingalensis) within the Breeding and Nonbreeding Seasons

    OpenAIRE

    Wijerathne, Iresha; Wickramasinghe, Sriyani

    2018-01-01

    The hornbills are among the most extraordinary looking birds in the world. Out of two species of hornbill, the Ocyceros gingalensis is the only endemic grey hornbill in Sri Lanka. This study was conducted in Mihintale Sanctuary which is comprised of secondary dry mixed evergreen forest patches and semiurbanized area from 2013 to 2015. Ad libitum focal animal sampling was used to construct an ethogram for the behavior of Sri Lanka grey hornbill (SLGh). The study recorded 35 behavioral events i...

  20. Management of projects for energy efficiency

    Directory of Open Access Journals (Sweden)

    Vuković Miodrag M.

    2014-01-01

    Full Text Available In an effort to lower operating costs and improve competitiveness, many organizations today are preparing projects in the field of energy saving. On the other hand, companies that provide energy services and implement these projects, need to build competences in this area to well manage the projects which are subject to energy savings and by this to justify the confidence of investors. This paper presents research that shows the most important factors for the development of local capacity in project management in the field of energy efficiency.

  1. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  2. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  3. Linking project-based production and project management temporary systems in multiple contexts : An introduction to the special edition

    NARCIS (Netherlands)

    Oerlemans, L.A.G.; Pretorius, M.W.

    2014-01-01

    As organisations in more and more industries look for flexible ways of production in the wake of rapidly changing market environments, project-based organising is becoming an increasingly important mode of organisation (Eisenhardt & Tabrizi, 1995). Whereas project-based organisation was

  4. Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2010-12-01

    Full Text Available Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1 to identify factors that contribute to delay in construction projects; (2 to analyse and rank the causes of delay rated by contractors; and (3 to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors' perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors' financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors' financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT are the most common effects of delay in construction projects.

  5. Optic issues in ongoing ERL projects

    International Nuclear Information System (INIS)

    Smith, S.L.; Muratori, B.D.; Owen, H.L.; Hoffstaetter, G.H.; Litvinenko, V.N.; Ben-Zvi, I.; Bai, M.; Beebe-Wang, J.; Blaskiewicz, M.; Calaga, R.; Fischer, W.; Chang, X.Y.; Kayran, D.; Kewisch, J.; MacKay, W.W.; Montag, C.; Parker, B.; Ptitsyn, V.; Roser, T.; Ruggiero, A.; Satogata, T.; Surrow, B.; Tepikian, S.; Trbojevic, D.; Yakimenko, V.; Zhang, S.Y.; Piot, Ph.

    2006-01-01

    A wide range of optics issues for energy recovery linac (ERL)-based projects are illustrated through the presentation of ongoing projects covering both light sources, at Cornell and Daresbury and high energy and nuclear physics accelerators at the Brookhaven National Laboratory. This presented range of projects demonstrates how the different designs teams see the challenges of studying and solving optics issues for their particular project's ERLs, with studies appropriate to the stage of maturity of the project. Finally, as an illustration of the complexity and detail behind a single aspect of ERL optics design we present an overview of the highly important generic topic of longitudinal phase space evolution in ERLs

  6. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  7. Quantifying economic benefits for rail infrastructure projects.

    Science.gov (United States)

    2014-10-01

    This project identifies metrics for measuring the benefit of rail infrastructure projects for key : stakeholders. It is important that stakeholders with an interest in community economic development play an active : role in the development of the rai...

  8. What factors do patients consider most important in making lung cancer screening decisions? Findings from a demonstration project conducted in the Veterans Health Administration.

    Science.gov (United States)

    Lillie, Sarah E; Fu, Steven S; Fabbrini, Angela E; Rice, Kathryn L; Clothier, Barbara; Nelson, David B; Doro, Elizabeth A; Moughrabieh, M Anas; Partin, Melissa R

    2017-02-01

    The National Lung Screening Trial recently reported that annual low-dose computed tomography screening is associated with decreased lung cancer mortality in high-risk smokers. This study sought to identify the factors patients consider important in making lung cancer screening (LCS) decisions, and explore variations by patient characteristics and LCS participation. This observational survey study evaluated the Minneapolis VA LCS Clinical Demonstration Project in which LCS-eligible Veterans (N=1388) were randomized to either Direct LCS Invitation (mailed with decision aid, N=926) or Usual Care (provider referral, N=462). We surveyed participants three months post-randomization (response rate 44%) and report the proportion of respondents rating eight decision-making factors (benefits, harms, and neutral factors) as important by condition, patient characteristics, and LCS completion. Overall, the most important factor was personal risk of lung cancer and the least important factor was health risks from LCS. The reported importance varied by patient characteristics, including smoking status, health status, and education level. Overall, the potential harms of LCS were reported less important than the benefits or the neutral decision-making factors. Exposure to Direct LCS Invitation (with decision aid) increased Veterans' attention to specific decision-making factors; compared to Usual Care respondents, a larger proportion of Direct LCS Invitation respondents rated the chance of false-positive results, LCS knowledge, LCS convenience, and anxiety as important. Those completing LCS considered screening harms less important, with the exception of incidental findings. Decision tools influence Veterans' perceptions about LCS decision-making factors. As the factors important to LCS decision making vary by patient characteristics, targeted materials for specific subgroups may be warranted. Attention should be paid to how LCS incidental findings are communicated. Published by

  9. Project ATTACK and Project VISTA: Benchmark studies on the road to NATO's early TNF policy

    International Nuclear Information System (INIS)

    Garrity, P.J.

    1994-01-01

    This paper is concerned with those studies and analyses that affected early NATO nuclear policy and force structure. The discussion focuses specifically on two open-quotes benchmarkclose quotes activities. Project VISTA and Project ATTACK. These two studies were chosen less because one can document their direct impact on NATO nuclear policy and more because they capture the state of thinking about tactical nuclear weapons at a particular point of time. Project VISTA offers an especially important benchmark in this respect. Project ATTACK is a rather different kind of benchmark. It is not a pathbreaking study. It is much narrower and more technical than VISTA. It appears to have received no public attention. Project ATTACK is interesting because it seems to capture a open-quotes nuts-and-boltsclose quotes feel for how U.S. (and thereby NATO) theater nuclear policy was evolving prior to MC 48. The background and context for Project VISTA and Project ATTACK are presented and discussed

  10. 3D Holographic Observatory for Long-term Monitoring of Complex Behaviors in Drosophila

    Science.gov (United States)

    Kumar, S. Santosh; Sun, Yaning; Zou, Sige; Hong, Jiarong

    2016-09-01

    Drosophila is an excellent model organism towards understanding the cognitive function, aging and neurodegeneration in humans. The effects of aging and other long-term dynamics on the behavior serve as important biomarkers in identifying such changes to the brain. In this regard, we are presenting a new imaging technique for lifetime monitoring of Drosophila in 3D at spatial and temporal resolutions capable of resolving the motion of limbs and wings using holographic principles. The developed system is capable of monitoring and extracting various behavioral parameters, such as ethograms and spatial distributions, from a group of flies simultaneously. This technique can image complicated leg and wing motions of flies at a resolution, which allows capturing specific landing responses from the same data set. Overall, this system provides a unique opportunity for high throughput screenings of behavioral changes in 3D over a long term in Drosophila.

  11. Organizational Diagnosis in Project-Based Companies

    Directory of Open Access Journals (Sweden)

    Behrouz Zarei

    2014-05-01

    Full Text Available The purpose of this article is to develop a new method for corporate diagnosis (CD. To this end, a method is developed for the diagnosis process of project-based companies. The article presents a case study in a large company where data have been collected through focus groups. Project delay, high project cost, and low profitability are examples of project deficiency in project-based companies. Such issues have made managers pay special attention to find effective solutions to improve them. Prominent factors are inappropriate strategy, structure, system, human resource management, and PMBOK(Project Management Body of Knowledge processes. Thus, CD and analysis is an important task in improvement of corporate performance. The CD model that is developed in this article could be used for project-based companies. The proposed method can be used for CD in any project-based company. This article provides an emphatic application of CD as a prerequisite for restructuring in project-based companies.

  12. The efficient importation and distribution of radioisotopes. Suggestions for the most economic importation of radioisotopes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-08-01

    In the course of their work in many Member States, IAEA technical assistance experts have sometimes encountered difficulties in connection with the importation of radioactive isotopes. In some countries they have been consulted as to the possible improvement of import procedures. The purpose of this publication is to summarize the experience that has been gained in the hope that it may be useful both to scientists who wish to import radioisotopes for their work and to public officials who are concerned with the administrative and financial aspects of the problem. This question is of considerable importance because many countries have only limited resources of scientific man-power and foreign exchange and hence it is essential, if these resources are to be utilized fully, that efficient importing procedures be established. Furthermore, the success or failure of technical assistance activities may depend on whether radioisotopes needed for the project can be efficiently imported. Although the data summarized in this publication are based mainly on the experience of medical users of radioisotopes, they are equally applicable to their uses in other fields such as agriculture and hydrology. This publication covers the subject of importation and distribution of radioisotopes, and concludes with a brief section on the domestic production of short-lived radioisotopes in research reactors.

  13. The efficient importation and distribution of radioisotopes. Suggestions for the most economic importation of radioisotopes

    International Nuclear Information System (INIS)

    1963-01-01

    In the course of their work in many Member States, IAEA technical assistance experts have sometimes encountered difficulties in connection with the importation of radioactive isotopes. In some countries they have been consulted as to the possible improvement of import procedures. The purpose of this publication is to summarize the experience that has been gained in the hope that it may be useful both to scientists who wish to import radioisotopes for their work and to public officials who are concerned with the administrative and financial aspects of the problem. This question is of considerable importance because many countries have only limited resources of scientific man-power and foreign exchange and hence it is essential, if these resources are to be utilized fully, that efficient importing procedures be established. Furthermore, the success or failure of technical assistance activities may depend on whether radioisotopes needed for the project can be efficiently imported. Although the data summarized in this publication are based mainly on the experience of medical users of radioisotopes, they are equally applicable to their uses in other fields such as agriculture and hydrology. This publication covers the subject of importation and distribution of radioisotopes, and concludes with a brief section on the domestic production of short-lived radioisotopes in research reactors

  14. Importance of Advanced Planning of Manufacturing for Nuclear Industry

    Directory of Open Access Journals (Sweden)

    Shykinov Nick

    2016-06-01

    Full Text Available In the context of energy demands by growing economies, climate changes, fossil fuel pricing volatility, and improved safety and performance of nuclear power plants, many countries express interest in expanding or acquiring nuclear power capacity. In the light of the increased interest in expanding nuclear power the supply chain for nuclear power projects has received more attention in recent years. The importance of the advanced planning of procurement and manufacturing of components of nuclear facilities is critical for these projects. Many of these components are often referred to as long-lead items. They may be equipment, products and systems that are identified to have a delivery time long enough to affect directly the overall timing of a project. In order to avoid negatively affecting the project schedule, these items may need to be sourced out or manufactured years before the beginning of the project. For nuclear facilities, long-lead items include physical components such as large pressure vessels, instrumentation and controls. They may also mean programs and management systems important to the safety of the facility. Authorized nuclear operator training, site evaluation programs, and procurement are some of the examples. The nuclear power industry must often meet very demanding construction and commissioning timelines, and proper advanced planning of the long-lead items helps manage risks to project completion time. For nuclear components there are regulatory and licensing considerations that need to be considered. A national nuclear regulator must be involved early to ensure the components will meet the national legal regulatory requirements. This paper will discuss timing considerations to address the regulatory compliance of nuclear long-lead items.

  15. Radiation requirements for uranium project approvals

    International Nuclear Information System (INIS)

    Hondros, J.

    2014-01-01

    Uranium mining projects in Australia must receive approval under both state and national laws based on a wide ranging impact assessment of the project. The process may take a number of years and involves multiple levels and parts of government and public consultation and scrutiny. The impact assessment is broad and usually covers; environmental, social, health, public safety and economic aspects. Information provided in the approvals documentation needs to be presented in a credible and understandable manner for all audiences. This means making complex information simpler, while making sure that it maintains its technical integrity. Poorly communicated information, which is overly complex, overly simplified or incomplete, can result in significant delays to the project approval which can potentially impact on project timelines. For uranium projects, along with other projects involving radioactive materials, such as minerals sands and rare earths, radiation and its impacts usually draw a disproportionate amount of both government and public scrutiny compared to other potential impacts and risks. It is therefore of key importance that radiation assessments are properly performed and results clearly presented and communicated with sufficient detail for stakeholders to make informed decisions. It is also important to ensure that the radiation risk is presented in perspective with other risks of the project. This presentation outlines a structure for a radiation impact assessment based on experience from a number of projects in Australia. The structure aims to be clear and simple and ensure the right balance between scientific fact, digestible information and demonstrable competence. (author)

  16. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  17. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  18. Applying a life cycle approach to project management methods

    OpenAIRE

    Biggins, David; Trollsund, F.; Høiby, A.L.

    2016-01-01

    Project management is increasingly important to organisations because projects are the method\\ud by which organisations respond to their environment. A key element within project management\\ud is the standards and methods that are used to control and conduct projects, collectively known as\\ud project management methods (PMMs) and exemplified by PRINCE2, the Project Management\\ud Institute’s and the Association for Project Management’s Bodies of Knowledge (PMBOK and\\ud APMBOK. The purpose of t...

  19. The importance of hydropower in Austria

    International Nuclear Information System (INIS)

    Kobau, R.; Pirker, O.; Spolwind, R.; Weiss, B.

    2009-01-01

    This article discusses the importance of hydropower-based power generation in Austria as a clean and emission-free source of electricity. The contribution made to total electricity generation is examined and figures are quoted. Hydropower is provided from both storage dams and run-of-river power stations such as those on the river Danube. The use of the various types of hydropower in connection with their economic optimisation, for example for the supply of valuable peak power, is discussed. The promotion of hydropower within the scope of European climate-protection efforts is examined. Projects concerning the augmentation of hydropower capacities are discussed and three exemplary projects are briefly described. Finally, the situation in Austria is compared with that to be found in neighbouring Switzerland.

  20. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  1. Base-age invariance and inventory projections

    Science.gov (United States)

    C. J. Cieszewski; R. L. Bailey; B. E. Borders; G. H. Brister; B. D. Shiver

    2000-01-01

    One of the most important functions of forest inventory is to facilitate management decisions towards forest sustainability based on inventory projections into the future. Therefore, most forest inventories are used for predicting future states of the forests, in modern forestry the most common methods used in inventory projections are based on implicit functions...

  2. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  3. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  4. Landscaping Considerations for Urban Stream Restoration Projects

    National Research Council Canada - National Science Library

    Bailey, Pam

    2004-01-01

    ... after restoration and its functionality for public use. The landscaping component of such stream and riparian restoration projects must be emphasized given its importance of visual success and public perception. The purpose of this technical note is to address landscaping considerations associated with urban stream and riparian restoration projects, and provide ideas to managers for enhancing the visual appeal and aesthetic qualities of urban projects.

  5. Identifying the most critical project complexity factors using Delphi method: the Iranian construction industry

    Directory of Open Access Journals (Sweden)

    Mohammad Mehdi Mozaffari

    2012-09-01

    Full Text Available Complexity is one of the most important issues influencing success of any construction project and there are literally different studies devoted to detect important factors increasing complexity of projects. During the past few years, there have been growing interests in developing mass construction projects in Iran. The proposed study of this paper uses Delphi technique to find out about important factors as barriers of construction projects in Iran. The results show that among 47 project complexity factors, 19 factors are more important than others are. The study groups different factors into seven categories including environmental, organizational, objectives, tasks, stakeholders, technological, information systems and determines the relative importance of each. In each group, many other sub group activities are determined and they are carefully investigated. The study provides some detailed suggestions on each category to reduce the complexity of construction project.

  6. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  7. Choice of baseline climate data impacts projected species' responses to climate change.

    Science.gov (United States)

    Baker, David J; Hartley, Andrew J; Butchart, Stuart H M; Willis, Stephen G

    2016-07-01

    Climate data created from historic climate observations are integral to most assessments of potential climate change impacts, and frequently comprise the baseline period used to infer species-climate relationships. They are often also central to downscaling coarse resolution climate simulations from General Circulation Models (GCMs) to project future climate scenarios at ecologically relevant spatial scales. Uncertainty in these baseline data can be large, particularly where weather observations are sparse and climate dynamics are complex (e.g. over mountainous or coastal regions). Yet, importantly, this uncertainty is almost universally overlooked when assessing potential responses of species to climate change. Here, we assessed the importance of historic baseline climate uncertainty for projections of species' responses to future climate change. We built species distribution models (SDMs) for 895 African bird species of conservation concern, using six different climate baselines. We projected these models to two future periods (2040-2069, 2070-2099), using downscaled climate projections, and calculated species turnover and changes in species-specific climate suitability. We found that the choice of baseline climate data constituted an important source of uncertainty in projections of both species turnover and species-specific climate suitability, often comparable with, or more important than, uncertainty arising from the choice of GCM. Importantly, the relative contribution of these factors to projection uncertainty varied spatially. Moreover, when projecting SDMs to sites of biodiversity importance (Important Bird and Biodiversity Areas), these uncertainties altered site-level impacts, which could affect conservation prioritization. Our results highlight that projections of species' responses to climate change are sensitive to uncertainty in the baseline climatology. We recommend that this should be considered routinely in such analyses. © 2016 John Wiley

  8. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  9. Projected Zika Virus Importation and Subsequent Ongoing Transmission after Travel to the 2016 Olympic and Paralympic Games - Country-Specific Assessment, July 2016.

    Science.gov (United States)

    Grills, Ardath; Morrison, Stephanie; Nelson, Bradley; Miniota, Jennifer; Watts, Alexander; Cetron, Martin S

    2016-07-22

    Zika virus belongs to the genus Flavivirus of the family Flaviviridae; it is transmitted to humans primarily through the bite of an infected Aedes species mosquito (e.g., Ae. aegypti and Ae. albopictus) (1). Zika virus has been identified as a cause of congenital microcephaly and other serious brain defects (2). As of June 30, 2016, CDC had issued travel notices for 49 countries and U.S. territories across much of the Western hemisphere (3), including Brazil, where the 2016 Olympic and Paralympic Games (Games of the XXXI Olympiad, also known as Rio 2016; Games) will be hosted in Rio de Janeiro in August and September 2016. During the Games, mosquito-borne Zika virus transmission is expected to be low because August and September are winter months in Brazil, when cooler and drier weather typically reduces mosquito populations (4). CDC conducted a risk assessment to predict those countries susceptible to ongoing Zika virus transmission resulting from introduction by a single traveler to the Games. Whereas all countries are at risk for travel-associated importation of Zika virus, CDC estimated that 19 countries currently not reporting Zika outbreaks have the environmental conditions and population susceptibility to sustain mosquito-borne transmission of Zika virus if a case were imported from infection at the Games. For 15 of these 19 countries, travel to Rio de Janeiro during the Games is not estimated to increase substantially the level of risk above that incurred by the usual aviation travel baseline for these countries. The remaining four countries, Chad, Djibouti, Eritrea, and Yemen, are unique in that they do not have a substantial number of travelers to any country with local Zika virus transmission, except for anticipated travel to the Games. These four countries will be represented by a projected, combined total of 19 athletes (plus a projected delegation of about 60 persons), a tiny fraction of the 350,000-500,000 visitors expected at the Games.* Overall

  10. Climate impacts from import of waste fuels; Klimatpaaverkan fraan import av braennbart avfall

    Energy Technology Data Exchange (ETDEWEB)

    Haraldsson, Maarten; Sundberg, Johan (Profu, Moelndal (Sweden))

    2009-04-15

    Imports of combustible waste has increased in recent years and imported waste has become an increasingly important fuel in the Swedish district heating systems. The projections for the next few years show that the imports can be much higher, partly due to reduced amounts of waste in the wake of economic downturn the world economy, partly because several new incinerators will be put into operation. In a environmental perspective, imports are controversial and it has been proposed that imports should be restricted. This report provides an assessment of the climate impact of importing waste for combustion. The report shows that greenhouse gas emissions due to imports of waste to the Swedish district heating plants in 2007 was reduced by 500 000 tonnes of carbon dioxide. This is equivalent to the emissions from 300 000 Swedes car journeys a year, or 2.5% of the total emission reduction target set by the Government for the non-trading sector until 2020. Imports of wood waste-chips accounts for the largest reduction, but the study shows that imports of other types of waste contribute to a reduction in emissions of greenhouse gases. The reasons for the reduction is that the use of imported waste fuel substitute for other heating and electricity generation, which gives the consequence that emissions are avoided. The largest emission reductions are obtained, however, by the importation of household waste by replacing the alternative waste treatment of the corresponding waste in the country of origin. In the countries from which imports of waste currently takes place there is a lack of treatment capacity for organic waste. The alternative treatment available is primarily deposition. This treatment causes significant emissions of methane, which is a very strong greenhouse gas. The shipment of waste that occur as a result of imports gives a marginal contribution of greenhouse gases, compared against the emission reductions outlined above

  11. Learning between projects: More than sending messages in bottles

    NARCIS (Netherlands)

    Hartmann, Andreas; Dorée, André

    2015-01-01

    Although learning from projects has gained much importance in research and practice, progress in understanding and improving inter-project learning appears to be slight. We argue that the adoption of a sender/receiver approach limits the learning effectiveness in project-based organisations. Drawing

  12. Methodology for Project Governence in CURS

    OpenAIRE

    Hribovšek, Anja

    2010-01-01

    Rare are organizations that haven’t met with project way of work yet. This also applies to government bodies. The degree addresses two areas which are very important for organizations that want to maintain control over costs, risk, functionality and complexity of a project. The first area is project management and the second area is system development process. The main purpose of the degree is to execute a complete analysis on both mentioned areas and to prepare or to renovate the met...

  13. Wind project gets boost

    Energy Technology Data Exchange (ETDEWEB)

    Oirere, Shem

    2012-11-01

    The development of a two-phase 100 MW wind power plant project in Tanzania moved a notch higher this year when Export-Import Bank of China extended a US$ 123 million non-concessional loan for its construction.

  14. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  15. Ranking of delay factors in construction projects after Egyptian revolution

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Time is one of the major considerations throughout project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Time delay is a very frequent phenomenon and is almost associated with nearly all constructing projects. However, little effort has been made to curtail the phenomenon, this research work attempts to identify, investigate, and rank factors perceived to affect delays in the Egyptian construction projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, researcher invited practitioners and experts, comprising a statistically representative sample to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of delay factors were identified in construction projects. Totally, ninety-nine (99 factors were short-listed to be made part of the questionnaire survey and were identified and categorized into nine (9 major categories. The survey was conducted with experts and representatives from private, public, and local general construction firms. The data were analyzed using Relative Importance Index (RII, ranking and simple percentages. Ranking of factors and categories was demonstrated according to their importance level on delay, especially after 25/1/2011 (Egyptian revolution. According to the case study results, the most contributing factors and categories (those need attention to delays were discussed, and some recommendations were made in order to minimize and control delays in construction projects. Also, this paper can serve as a guide for all construction parties with effective management in construction projects to achieve a competitive level of quality and a time effective project.

  16. PROJECT GOVERNANCE – PHASES AND LIFE CYCLE

    Directory of Open Access Journals (Sweden)

    Robbert Titus DEENEN

    2007-01-01

    Full Text Available When talking about projects, the barrier is clear: successful and failed. Some fail due to different reasons, but lack of good project and risk management played a large part. Others succeed largely because of the rigorous and disciplined application of good project practices. But both groups illustrate many points that underline and demonstrate important concepts applicable to current projects. Systematic application of good methods leads to successful outcomes in projects of all types. All projects are fundamentally dependent on people, and human beings are not very different today than we were hundreds, or even thousands, of years ago. This paper uncovers main elements in projects area such as the concepts and governance of projects, with an underline of the main characteristics and the projects phases and life cycle that erase the uncertainty that joins all the projects built at any time.

  17. Supplier Alliances for Engineered Equipment in Capital Projects

    National Research Council Canada - National Science Library

    Harper, Douglas

    2003-01-01

    .... Managing the engineered equipment is important during all phases of the project not only because of their high dollar value but also because the long manufacturing lead times often drive the overall project schedules...

  18. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Gilbert Gilbert Silvius; Jasper van den Brink

    2011-01-01

    Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management. Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of sustainability in

  19. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  20. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  1. [Anthropology and oral health projects in developing countries].

    Science.gov (United States)

    Grasveld, A E

    2016-01-01

    The mouth and teeth play an important role in social interactions around the world. The way people deal with their teeth and mouth, however, is determined culturally. When oral healthcare projects are being carried out in developing countries, differing cultural worldviews can cause misunderstandings between oral healthcare providers and their patients. The oral healthcare volunteer often has to try to understand the local assumptions about teeth and oral hygiene first, before he or she can bring about a change of behaviour, increase therapy compliance and make the oral healthcare project sustainable. Anthropology can be helpful in this respect. In 2014, in a pilot project commissioned by the Dutch Dental Care Foundation, in which oral healthcare was provided in combination with anthropological research, an oral healthcare project in Kwale (Kenia) was evaluated. The study identified 6 primary themes that indicate the most important factors influencing the oral health of school children in Kwale. Research into the local culture by oral healthcare providers would appear to be an important prerequisite to meaningful work in developing countries.

  2. Survey to promote an action implemented jointly project; Kyodo jisshi katsudo project suishin chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the 1st (1995) conference of the nations which concluded the Framework Convention on Climate Change, decided on was a trial implementation of an action implemented jointly (AIJ) project with developing countries on the voluntary basis. In the Asia region, emission of greenhouse effect gas is remarkably increasing in accordance with rapid development of economy, and it is important to appropriately support through this project both economic development and energy demand in Asia. Taking the circumstance into consideration, the survey was conducted to contribute to activating the AIJ Japan Program. As the AIJ of leading developed countries, recognized were 25 (U.S.), 6 (Holland), 8 (Germany), 2 (Norway) projects. As to the AIJ in Southeast Asia, China and India, Indonesia is actively participating in the project, but others less actively. Concerning the project needs in every country, heightening of power plant efficiency, enhancement of efficiency in the transportation sector, new energy utilization, recovery of methane gas, etc. acquire a priority. 21 figs., 31 tabs.

  3. Users and user study methodology: the JUBILEE project

    Directory of Open Access Journals (Sweden)

    Linda Banwell

    2004-01-01

    Full Text Available This paper presents both theoretical aspects and practical examples from the on-going and large-scale JUBILEE (JISC User Behaviour in Information seeking: Longitudinal Evaluation of Electronic information services project, now in its fifth year. Particular emphasis will be placed on the importance of using robust theory and methods as the basis for reputable user studies, especially those undertaken by practitioners. Theory underlying the development of the JUBILEE project and Toolkit is outlined, followed by demonstration of its practical use and impact during the project's on-going program of monitoring and evaluation activities. Themes underlying the paper concern the importance to practitioners of the need to understand and adopt a well founded methodology and sound methods with which to conduct projects, the additional benefits they can derive by so doing, and the pitfalls and dangers of not so doing. JUBILEE is used throughout as the example project to demonstrate the points made.

  4. Aquatic Species Project report, FY 1989--1990

    Energy Technology Data Exchange (ETDEWEB)

    Brown, L.M.; Sprague, S.

    1992-01-01

    This report summarizes the progress and research accomplishments of the Aquatic Species Project. The four articles included are summaries of individual research projects and are entered into the EDB as such. The goal of the Aquatic Species Project is to develop the technology base for large-scale production of oil-rich microalgae. The project is also developing methods to convert the microalgal lipids into liquid fuels needed for industry and transportation. Researchers in the Aquatics Species Project focus on the use of microalgae as a feedstock for producing renewable, high-energy liquid fuels such as diesel. It is important for the United States to develop alternative renewable oil sources because 42% of the current energy market in the United States is for liquid fuels, and 38% of these fuels are imported. In 1979, the US Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) initiated the Aquatic Species Project as part of the overall effort in biofuels. The project began to focus exclusively on fuels from microalgae in 1982. Estimates show that the technology being developed by the project can provide as much as 7% of the total current energy demand. The program`s basic premise is that microalgae, which have been called the most productive biochemical factories in the world, can produce up to 30 times more oil per unit of growth area than land plants. Selected papers were processed separately for inclusion in the Energy Science and Technology Database.

  5. APRI - Accident Phenomena of Risk Importance. Final Report

    International Nuclear Information System (INIS)

    Frid, W.; Hammar, L.; Soederman, E.

    1996-12-01

    The APRI-project started in 1992 with participation of the Swedish Nuclear Power Inspectorate (SKI) and the Swedish utilities. The Finnish utility TVO joined the project in 1993. The aim of the project has been to work with phenomenological questions in severe accidents, concentrating on the risk-dominating issues. The work is reported in separate sub-project reports, the present is the final report of the methodological studies as well as a final report for the total project. The research has led to clarifications of the risk complex, and ameliorated the basis for advanced probabilistic safety analyses, specially for the emission risks (PSA level 2) which are being studied at the Swedish plants. A new method has been tried for analysis of complicated accident courses, giving a possibility for systematic evaluation of the impact of different important phenomena (e.g. melt-through, high pressure melt-through with direct heating of the containment atmosphere, steam explosions). In this method, the phenomena are looked upon as top events of a 'phenomena-tree', illustrating how various conditions must be met before the top-event can happen. This method has been useful, in particular for applying 'expert estimates'. 47 refs

  6. [Projective identification in human relations].

    Science.gov (United States)

    Göka, Erol; Yüksel, Fatih Volkan; Göral, F Sevinç

    2006-01-01

    Melanie Klein, one of the pioneers of Object Relations Theory, first defined "projective identification", which is regarded as one of the most efficacious psychoanalytic concepts after the discovery of the "unconscious". Examination of the literature on "projective identification" shows that there are various perspectives and theories suggesting different uses of this concept. Some clinicians argue that projective identification is a primitive defense mechanism observed in severe psychopathologies like psychotic disorder and borderline personality disorder, where the intra-psychic structure has been damaged severely. Others suggest it to be an indispensable part of the transference and counter-transference between the therapist and the patient during psychotherapy and it can be used as a treatment material in the therapy by a skillful therapist. The latter group expands the use of the concept through normal daily relationships by stating that projective identification is one type of communication and part of the main human relation mechanism operating in all close relationships. Therefore, they suggest that projective identification has benign forms experienced in human relations as well as malign forms seen in psychopathologies. Thus, discussions about the definition of the concept appear complex. In order to clarify and overcome the complexity of the concept, Melanie Klein's and other most important subsequent approaches are discussed in this review article. Thereby, the article aims to explain its important function in understanding the psychopathologies, psychotherapeutic relationships and different areas of normal human relations.

  7. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Jasper van den Brink; Gilbert Gilbert Silvius

    2012-01-01

    Full text via link Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of

  8. The CONNECT project

    DEFF Research Database (Denmark)

    Assaf, Yaniv; Alexander, Daniel C; Jones, Derek K

    2013-01-01

    Of Neuroimagers for the Non-invasive Exploration of brain Connectivity and Tracts) project aimed to combine tractography and micro-structural measures of the living human brain in order to obtain a better estimate of the connectome, while also striving to extend validation of these measurements. This paper...... summarizes the project and describes the perspective of using micro-structural measures to study the connectome.......In recent years, diffusion MRI has become an extremely important tool for studying the morphology of living brain tissue, as it provides unique insights into both its macrostructure and microstructure. Recent applications of diffusion MRI aimed to characterize the structural connectome using...

  9. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  10. The Role And Importance Of Communication In Management

    OpenAIRE

    Dijana Gupta

    2011-01-01

    From the aspect of management, communication process takes a special role because the same one is being required for a success, progress and achievement of objectives of each organization. The work itself discusses the concept of communication, its role and importance in management, where the models, techniques and obstacles to communication projects are being processed. The problem of scientific research and the subject of this work is contained in considering the role and importance of comm...

  11. Social Network Project for IDEAL in CS5604

    OpenAIRE

    Harb, Islam; Jin, Yilong; Cedeno, Vanessa; Mallampati, Sai Ravi Kiran; Bulusu, Bhaskara Srinivasa Bharadwaj

    2015-01-01

    The IDEAL (Integrated Digital Event Archiving and Library) project involves VT faculty, staff, and students, along with collaborators around the world, in archiving important events and integrating the digital library, and archiving approaches to support the Research and Development related to important events. An objective of the CS5604 (Information Retrieval), Spring 2015 course, was to build a state-of-the-art information retrieval system, in support of the IDEAL project. Students were di...

  12. Communication activities during remediation project of Zavratec

    International Nuclear Information System (INIS)

    Kukovica, T.; Mele, I.

    1996-01-01

    The remediation project of temporary storage of radioactive waste near village Zavratec is under way. The Agency for Radwaste Management was assigned to perform this project by the Slovenian government. Radioactive waste was stored on site of Zavratec in 1961. That year an accident has occurred at Oncological institute in Ljubljana in which several rooms and some equipment have been contaminated by the content of radium applicator. Radioactive waste from decontamination was transported and stored in an old Italian military barrack near village Zavratec. The storage became known to public in eighties by the TV report. Since that time it is frequently the subject of public polemics and discussions. This year the first part of remediation project, i.e. the activity measurements and sorting of radioactive waste is taking place. It is planned to conclude the project next year. For successful realization of the project the PR activities, specially the communication with the local community, are of great importance. Special plan of these activities has been prepared by the Agency for Radwaste Management in early stage of the project. Initial activities have already been successfully realized. In this paper the communication plan is presented and most important elements of this plan are briefly described. (author)

  13. Import of biomass. Obstacles to imports of biomass. A stakeholder approach. Memo. Report on BUS ticket no. 26

    International Nuclear Information System (INIS)

    Meeusen, M.; Kramer, K.J.; Vogelzang, T.

    2004-01-01

    In the discussion on imports of biomass a number of obstacles are mentioned. It is very important to know these barriers and to find out how they may be overcome. Questions to be answered are (1) Which are the main objections against import of biomass (negative impacts on biodiversity, competition with the production of food, disbalance of nutrients, etc); (2) Is it possible to quantify these objections?; and (3) What are the possibilities to overcome these barriers? The Biomass Upstream Steering committee (BUS), consisting of the participating consortium partners, was created to generate new ideas, select and rank the most promising ones to be worked out in more detail and to invite market parties to jointly set up R and D projects on upstream biomass

  14. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  15. Learning between projects: More than sending messages in bottles

    OpenAIRE

    Hartmann, Andreas; Dorée, André

    2015-01-01

    Although learning from projects has gained much importance in research and practice, progress in understanding and improving inter-project learning appears to be slight. We argue that the adoption of a sender/receiver approach limits the learning effectiveness in project-based organisations. Drawing upon the notion of learning as a social activity embedded in an organisational context, we develop the argument that learning from projects takes place within projects rooted in the historical, or...

  16. Growth and Project Finance in the Least Developed Countries

    DEFF Research Database (Denmark)

    la Cour, Lisbeth F.; Müller, Jennifer

    2014-01-01

    for economic growth in LDCs. We find that a higher regulatory quality, lower government consumption and a higher level of education helps increase growth. The significance of these variables are, however, not as consistently robust as the results for project finance.......This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using...... data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of financing in the selected set of countries. Additionally, the project sheds light on other factors of importance...

  17. Importance of point-by-point back projection correction for isocentric motion in digital breast tomosynthesis: Relevance to morphology of structures such as microcalcifications

    International Nuclear Information System (INIS)

    Chen Ying; Lo, Joseph Y.; Dobbins, James T. III

    2007-01-01

    Digital breast tomosynthesis is a three-dimensional imaging technique that provides an arbitrary set of reconstruction planes in the breast from a limited-angle series of projection images acquired while the x-ray tube moves. Traditional shift-and-add (SAA) tomosynthesis reconstruction is a common mathematical method to line up each projection image based on its shifting amount to generate reconstruction slices. With parallel-path geometry of tube motion, the path of the tube lies in a plane parallel to the plane of the detector. The traditional SAA algorithm gives shift amounts for each projection image calculated only along the direction of x-ray tube movement. However, with the partial isocentric motion of the x-ray tube in breast tomosynthesis, small objects such as microcalcifications appear blurred (for instance, about 1-4 pixels in blur for a microcalcification in a human breast) in traditional SAA images in the direction perpendicular to the direction of tube motion. Some digital breast tomosynthesis algorithms reported in the literature utilize a traditional one-dimensional SAA method that is not wholly suitable for isocentric motion. In this paper, a point-by-point back projection (BP) method is described and compared with traditional SAA for the important clinical task of evaluating morphology of small objects such as microcalcifications. Impulse responses at different three-dimensional locations with five different combinations of imaging acquisition parameters were investigated. Reconstruction images of microcalcifications in a human subject were also evaluated. Results showed that with traditional SAA and 45 deg. view angle of tube movement with respect to the detector, at the same height above the detector, the in-plane blur artifacts were obvious for objects farther away from x-ray source. In a human subject, the appearance of calcifications was blurred in the direction orthogonal to the tube motion with traditional SAA. With point-by-point BP, the

  18. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  19. Enriching project organizations with formal change agents

    DEFF Research Database (Denmark)

    Eskerod, Pernille; Justesen, Just Bendix; Sjøgaard, Gisela

    2017-01-01

    Purpose: Project success requires effective and efficient cooperation between the project organization and the permanent organization in which the project takes place. The purpose of this paper is to discuss potentials and pitfalls from enriching project organizations by appointing peers as formal...... and middle and top management support are major determinants of success within change projects. To select change agents that the employees respect and can identify with, combined with top management prioritization, is important in order for the project organization to benefit from the additional role...... change agents. Design/methodology/approach: The paper is based on a literature review and a multiple-case study in which six organizations participated in an action-oriented research project. The aim for the organizations was to obtain a better health status among the employees by accomplishing...

  20. Social learning in transnational projects – lessons from European territorial cooperation projects

    Directory of Open Access Journals (Sweden)

    Joern Harfst

    2015-04-01

    Full Text Available Old industrial regions in Europe have undergone radical changes in the last decades. After downsizing or closure of predominant industries such regions usually face big challenges concerning their economic, social and ecological futures. One chance to master this transformation process is the identification and sustainable utilisation of potentials left by industrial production. Utilisation of regional potentials, commonly categorized as natural and cultural potentials, was the aim of two transnational cooperation projects ReSource and SHIFT-X, which were both funded by European Union’s Development Fund (ERDF, INTERREG IVB. The paper shows how the involvement of research partners in the projects supported and facilitated joint learning effects and knowledge transfer between all project partners. It is argued that on the one hand such an approach offers important mutual benefits for partners, while on the other hand the realisation of such benefits remains a challenging task in a transnational collaboration. In declining industrial regions, especially when characterised by small- and medium-sized towns, the capacities to act are scarce and any outside intervention is often seen more as an unwanted factor that additionally stretches resources and provides little advantages for such regions. Therefore one of the main aims in transnational collaboration has to be the establishment of a trustful and committed working relation between all partners. The engagement in the projects has shown that the joint work between regional actors and the external academic partners can create important transnational learning effects for all involved; nevertheless it has to overcome certain reservations on all sides before innovative ways can be pursued successfully.

  1. The Importance of Communication in Quality Management

    Directory of Open Access Journals (Sweden)

    Anca Cristina Stanciu

    2016-01-01

    Full Text Available From a managerial perspective, communication is regarded as a process of understandingamong people by means of information exchange. According to the principle “quality starts withthe manager”, his role becomes crucial, one of the main traits of the manager’s behaviour beingthe ability to communicate effectively.Important in any aspect of quality management,communication plays an essential role in developing business projects. As a component of publicrelations, although less spectacular than marketing communication, quality managementcommunication is an exciting activity, extremely useful in projects management.This paper aims todemonstrate the economic role and the benefits of using communication as a tool of qualitymanagement programs for improving the quality of organizational activity.

  2. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  3. How the Project Approach Challenges Young Children

    Science.gov (United States)

    Burns, Marcia V.; Lewis, Alisha L.

    2016-01-01

    In this article, educators at University Primary School in Champaign, Illinois, share examples and understandings of the ways The Project Approach challenges young children to think critically about topics of importance in their world. Project investigations that provoke academic and social challenges for individuals and classroom communities of…

  4. De Sitter projective relativity

    CERN Document Server

    Licata, Ignazio; Benedetto, Elmo

    2017-01-01

    This book presents the Projective approach to de Sitter Relativity. It traces the development of renewed interest in models of the universe at constant positive curvature such as "vacuum" geometry. The De Sitter Theory of Relativity, formulated in 1917 with Willem De Sitter's solution of the Einstein equations, was used in different fields during the 1950s and 1960s, in the work of H. Bacry, J.M. LevyLeblond and F.Gursey, to name some important contributors. From the 1960s to 1980s, L. Fantappié and G. Arcidiacono provided an elegant group approach to the De Sitter universe putting the basis for special and general projective relativity. Today such suggestions flow into a unitary scenario, and this way the De Sitter Relativity is no more a "missing opportunity" (F. Dyson, 1972), but has a central role in theoretical physics. In this volume a systematic presentation is given of the De Sitter Projective relativity, with the recent developments in projective general relativity and quantum cosmology.

  5. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Survey of Australian industrial capability and construction capability relative to Australian brown coal liquefaction plant construction project (Annexed materials: Lists of projects undertaken by important corporations in Australia); 1981 nendo Goshu kattan ekika plant no kensetsu ni kakawaru kogyoryoku, kensetsu kojiryoku ni kansuru chosa seika hokokusho (fuzoku shiryo). Australia ni okeru shuyo kigyo no jisshi project list

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    In relation with the construction of an Australian brown coal liquefaction plant, a survey is conducted into projects being undertaken by important businesses in Australia, and lists are compiled about them. Mentioned in the lists are the head office, directors, number of employees, line of business, contents of projects, the names of clients, etc., for each of 12 corporations including consulting firms and engineering contractors such as the Bechtel Pacific Corporation Limited. Named in the lists also are 17 manufacturers of pipes and tubes, pressure vessels, heat exchangers, tower tanks, steel structures and other fabricated metallic items, boilers, water treatment systems, pumps, electrical equipment, instrumentation, valves, iron and steel, etc. Furthermore, in relation with civil engineering and construction, 7 corporations including the Citra Constructions Limited are mentioned. (NEDO)

  6. The interdisciplinary nature of the skills needed by project managers

    Directory of Open Access Journals (Sweden)

    Trevor Nesbit

    Full Text Available The purpose of this paper is to explore and analyse the additional skills that are transferrable across different sectors, that project managers require and that go beyond technical project management skills to enable them to be successful in what is becoming an increasingly interdisciplinary role.The conclusions highlight that the project management role requires a range of non- technical project management skills and characteristics to enable project management to be carried out successfully. These non- technical project management skills and characteristics include the ability to build relationships with stakeholders; possessing formal project management certification; understanding the creation and functioning of project teams; understanding the political environment that the project exists in; the ability to work in a team; possessing leadership and management skills; possessing interpersonal and communication skills and possessing a strategic orientation.The skills and characteristics that are perceived by the cross section of project managers as being the most important are possessing interpersonal and communication skills; possessing leadership and management skills; the ability to work in a team and the ability to build relationships with stakeholders. Interpersonal and communication skills along with the ability to work in a team are not included significantly in job advertisements for project managers, with the requirement to have them potentially being assumed and not needed to be stated.This research provides a basis for a further study involving in-depth interviews with project managers from the information technology sector with the aim of highlighting specific projects where these additional skills have been vital to the success of these projects.Issues surrounding the political environment of the project from the perspective of different genders; the importance interpersonal and communication skills along with team work for

  7. Decree from July 25, 2015 related to general prescriptions applicable to geothermal activities of minor importance. Decree from July 25, 2015 related to the certification of drilling companies intervening in geothermal energy of minor importance. Decree from July 25, 2015 related to the zoning map in the field minor importance geothermal energy

    International Nuclear Information System (INIS)

    Delduc, P.; Blanc, P.; Michel, L.

    2015-01-01

    These decrees concern various actors of the geothermal sector in the case of projects and works of minor importance. The first one defines general technical prescriptions applicable to a geothermal site of minor importance, the conditions related to the implantation of a geothermal installation of minor importance, measures to be implemented when performing geothermal works and when stopping its exploitation, control and maintenance modalities in order to prevent risks for the environment and to preserve water resource quality. The second decree defines measures to be implemented by drilling companies in the case of geothermal projects of minor importance. The third decree defines the map of geothermal areas of minor importance, specifies the map elaboration methodology and its reviewing modalities

  8. Bali beach conservation project and issues related to beach maintenance after completion of project

    OpenAIRE

    Onaka, S.; Endo, S.; Uda, T.

    2013-01-01

    Bali Island in Indonesia is a world-famous resort area, and the beaches composed of coral sand are one of the most important resources for tourism. However, serious beach erosion has occurred since the 1970s owing to the tourism development along the coastal areas. To recover previous natural sandy beaches, Bali Beach Conservation Project was undertaken by the Indonesian Government as the ODA project financed by Japan. Three seriously eroded beaches (Sanur, Nusa Dua and Kuta) with a total len...

  9. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  10. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  11. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  12. Relative importance of professional practice and engineering management competencies

    Science.gov (United States)

    Pons, Dirk

    2016-09-01

    Problem: The professional practice of engineering always involves engineering management, but it is difficult to know what specifically to include in the undergraduate curriculum. Approach: The population of New Zealand practising engineers was surveyed to determine the importance they placed on specific professional practice and engineering management competencies. Findings: Results show that communication and project planning were the two most important topics, followed by others as identified. The context in which practitioners use communication skills was found to be primarily with project management, with secondary contexts identified. The necessity for engineers to develop the ability to use multiple soft skills in an integrative manner is strongly supported by the data. Originality: This paper is one of only a few large-scale surveys of practising engineers to have explored the soft skill attributes. It makes a didactic contribution of providing a ranked list of topics which can be used for designing the curriculum and prioritising teaching effort, which has not previously been achieved. It yields the new insight that combinations of topics are sometimes more important than individual topics.

  13. Importance of an EIA to achieve acceptance, tolerance and participation

    Energy Technology Data Exchange (ETDEWEB)

    Falkemark, G. [Goeteborg Univ. (Sweden)

    1995-12-01

    The article tries to answer the two questions: How are important decisions made in Sweden? and What role do the Environmental Impact Statements and Environmental Evaluations play in the decision-making process? Examples are given from two important Swedish projects outside the nuclear field, and a discussion about the coming issue of a waste repository is presented.

  14. Determining Vulnerability Importance in Environmental Impact Assessment

    International Nuclear Information System (INIS)

    Toro, Javier; Duarte, Oscar; Requena, Ignacio; Zamorano, Montserrat

    2012-01-01

    The concept of vulnerability has been used to describe the susceptibility of physical, biotic, and social systems to harm or hazard. In this sense, it is a tool that reduces the uncertainties of Environmental Impact Assessment (EIA) since it does not depend exclusively on the value assessments of the evaluator, but rather is based on the environmental state indicators of the site where the projects or activities are being carried out. The concept of vulnerability thus reduces the possibility that evaluators will subjectively interpret results, and be influenced by outside interests and pressures during projects. However, up until now, EIA has been hindered by a lack of effective methods. This research study analyzes the concept of vulnerability, defines Vulnerability Importance and proposes its inclusion in qualitative EIA methodology. The method used to quantify Vulnerability Importance is based on a set of environmental factors and indicators that provide a comprehensive overview of the environmental state. The results obtained in Colombia highlight the usefulness and objectivity of this method since there is a direct relation between this value and the environmental state of the departments analyzed. - Research Highlights: ► The concept of vulnerability could be considered defining Vulnerability Importance included in qualitative EIA methodology. ► The use of the concept of environmental vulnerability could reduce the subjectivity of qualitative methods of EIA. ► A method to quantify the Vulnerability Importance proposed provides a comprehensive overview of the environmental state. ► Results in Colombia highlight the usefulness and objectivity of this method.

  15. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  16. Summer Project Report

    CERN Document Server

    Islam, Wasikul

    2015-01-01

    In this project we mainly prepared and classified several materials, important links for understanding accelerators for different age group. Accelarators now-a-days are very much important tool for not only particle physics laboratories but also for the common people for its extended applications. So, it is very much important to make people know the basics of accelerators, its basic principles, objectives and different varieties. As different age group of people have different level of understandings, so it was necessary to develop materials differently for categories based on age group. Hence, for three different categories we have separately prepared different presentations and collected important all the useful weblinks, videos, animations, games etc. related to accelerators and put them to our new webpage : https://twiki.cern.ch/twiki/bin/view/Main/Material

  17. Industrial participation in TRISTAN project at KEK, Japan

    International Nuclear Information System (INIS)

    Ozaki, Satoshi.

    1990-01-01

    Industry-Laboratory collaborations played a very important role in the construction of TRISTAN electron-positron colliding beam facility, and brought this construction project to a successful completion in a scheduled time. What had motivated the collaborations, what were the important elements in the successful collaborations and how the collaborations worked will be given based on the authors experience as the TRISTAN Project Director. It is my pleasure to participate in this meeting of IISSC, and to present a talk on my experience with industry-laboratory cooperations in the construction of a major high energy accelerator facility in Japan; namely the TRISTAN electron-positron colliding beam facility project at KEK, (National Laboratory for High Energy Physics) in Tsukuba, Japan

  18. Baseline methodologies for clean development mechanism projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.K. (ed.); Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-15

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  19. Baseline methodologies for clean development mechanism projects

    International Nuclear Information System (INIS)

    Lee, M.K.; Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-01

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  20. Show Me the Money: Importance of Crowdfunding Factors on Backers’ Decisions to Financially Support Kickstarter Campaigns

    Directory of Open Access Journals (Sweden)

    Rita Colistra

    2017-10-01

    Full Text Available Through the use of an online survey and supporting interviews of funders, this study explores which factors are most influential in people’s decisions to financially back Kickstarter projects. Findings suggest that Kickstarter has several distinct benefits for those who support its projects and offers them an experience that traditional production channels cannot. The results also indicate that backers typically feel involved in the process of creating the projects they support, and they are willing to take risks to see projects that are important to them come to fruition. This research helps to improve our understanding of the attitudes that drive Kickstarter funding, and it helps project creators know what aspects of their campaigns prospective supporters find most important.

  1. Leadership and Human Resource Management in Project Circumstances

    OpenAIRE

    Fadjar, Adnan

    2008-01-01

    Leadership is a very important issue in any organizations. The complexity of a project makes the role of the project manager as the leader even more challenging because he/she has to work in an organization which has relatively short time period and dealing with many people who come from various backgrounds. This paper discusses various theories of leadership and proposes their application in project circumstances. As It is often said that the project management is effective if it can manage ...

  2. Lights! Camera! Action Projects! Engaging Psychopharmacology Students in Service-based Action Projects Focusing on Student Alcohol Abuse.

    Science.gov (United States)

    Kennedy, Susan

    2016-01-01

    Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.

  3. A Multi-Objective Trade-Off Model in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-10-01

    Full Text Available Based on the consideration of the relative importance of sustainability-related objectives and the inherent nature of sustainable construction projects, this study proposes that the contractor can balance the levels of efforts and resources used to improve the overall project sustainability. A multi-objective trade-off model using game theory was established and verified through simulation and numerical example under a moral hazard situation. Results indicate that effort levels of the contractor on sustainability-related objectives are positively related to the outcome coefficient while negatively to the coefficients of effort cost of the relevant objectives. High levels of the relative importance of sustainability-related objectives contribute to high levels of effort of the contractor. With the variation in effort levels and the coefficient of benefit allocation, the project net benefit increases before declining. The function of project benefit has a marked peak value, with an inverted “U” shape. An equilibrium always exists as for the given relative importance and coefficients of the effort costs of sustainability-related objectives. Under this condition, the owner may offer the contractor a less intense incentive and motivate the contractor reasonably arranging input resources. The coefficient of benefit allocation is affected by the contractor characteristic factors and the project characteristic factors. The owner should balance these two types of factors and select the most appropriate incentive mechanism to improve the project benefit. Meanwhile, the contractor can balance the relative importance of the objectives and arrange the appropriate levels of effort and resources to achieve a sustainability-related objective. Very few studies have emphasized the effects of the relative importance of sustainability-related objectives on the benefits of sustainable construction projects. This study therefore builds a multi-objective trade

  4. Molecular Tracing of Viral Pathogen in Aquaculture (MOLTRAQ): a new EMIDA project

    DEFF Research Database (Denmark)

    Jensen, B. Bang; Aldrin, M.; Avarre, M. C.

    2012-01-01

    a generic approach to viral disease control by using information on epidemiological and phylogenetic attributes from several important aquatic animal viruses. The project will i) generate and use spatio-temporal epidemiological data, phylogeographic data and gene expression data for important host......-viral pathogen systems to identify important factors affecting the spread of diseases in aquaculture, and ii) integrate these in scenario simulation models to assess effects of various control strategies for selected host-pathogen systems. The project consists of six workpackages: WP 1: Project co...

  5. Tax issues and incentives for biomass projects

    International Nuclear Information System (INIS)

    Martin, K.

    1993-01-01

    The federal government offers a number of tax incentives to developers of biomass projects. This paper describes each tax benefit, explains what conditions must be met before the benefit is available, and offers practical insights gained from working for over 10 years in the field. Understanding what tax benefits are available is important because the more tax benefits a developer can qualify for in connection with his project, the less expensive the project will be to build and operate and the easier it will be to arrange financing because there will be higher returns in the project for potential investors

  6. Adaptive multiple importance sampling for Gaussian processes

    Czech Academy of Sciences Publication Activity Database

    Xiong, X.; Šmídl, Václav; Filippone, M.

    2017-01-01

    Roč. 87, č. 8 (2017), s. 1644-1665 ISSN 0094-9655 R&D Projects: GA MŠk(CZ) 7F14287 Institutional support: RVO:67985556 Keywords : Gaussian Process * Bayesian estimation * Adaptive importance sampling Subject RIV: BB - Applied Statistics, Operational Research OBOR OECD: Statistics and probability Impact factor: 0.757, year: 2016 http://library.utia.cas.cz/separaty/2017/AS/smidl-0469804.pdf

  7. User Satisfaction Issues in ERP Projects

    OpenAIRE

    Shahin Dezdar

    2012-01-01

    Over the past few years, companies in developing countries have implemented enterprise resource planning (ERP) systems. Regardless of the various benefits of the ERP system, its adoption and implementation have not been without problems. Many companies have assigned considerable organizational resources to their ERP projects, but have encountered unexpected challenges. Neglecting a number of important factors in ERP projects might lead to failure instead of success. User ...

  8. Linear-programming-based heuristics for project capacity planning

    NARCIS (Netherlands)

    Gademann, A.J.R.M.; Schutten, J.M.J.

    2005-01-01

    Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi-project organization is capacity planning. By capacity planning, we mean the problem of matching demand for

  9. Biases in Project Escalation : Names, frames & construal levels

    NARCIS (Netherlands)

    N. Benschop (Nick)

    2016-01-01

    markdownabstractSummary The importance of information systems to organizations continues to grow. Large sums of money are invested in information system (IS) projects. However, many IS projects fail to meet their targets or even fail completely. In the effort to successfully control such

  10. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  11. Numatron project

    Energy Technology Data Exchange (ETDEWEB)

    Sugimoto, K [Osaka Univ., Toyonaka (Japan). Dept. of Physics; Hirao, Yasuo

    1977-04-01

    A project of high energy heavy ion acceleration is under consideration. The high energy heavy ions can produce highly condensed states of nuclei. A new phase of nucleus would be seen at the incident energy higher than 140 MeV/nucleon. High energy heavy ions causing high density states and meson emission will produce various new nuclides. Process of formation of atomic elements will be studied. Various fields of science can be also investigated by the high energy heavy ions. Spectroscopic study of multi-valent ions will be made high energy uranium. Study of materials for the fusion reactor is important. Impurity heavy ion from the wall of the fusion reactor may lose the energy of the reactor, and the characteristic features of heavy ions should be investigated. The highly ionized states of atoms are also produced by heavy ion injection into material. Several projects of heavy ion acceleration are in progress in the world. The Numatron project in Japan is to construct a combination machine of a Cockcroft type machine, three linear accelerator and a synchrotron. The planned energy of the machine is 670 MeV/nucleon. Technical problems are under investigation.

  12. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  13. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  14. Role of community acceptance in sustainable bioenergy projects in India

    International Nuclear Information System (INIS)

    Eswarlal, Vimal Kumar; Vasudevan, Geoffrey; Dey, Prasanta Kumar; Vasudevan, Padma

    2014-01-01

    Community acceptance has been identified as one of the key requirements for a sustainable bioenergy project. However less attention has been paid to this aspect from developing nations and small projects perspective. Therefore this research examines the role of community acceptance for sustainable small scale bioenergy projects in India. While addressing the aim, this work identifies influence of community over bioenergy projects, major concerns of communities regarding bioenergy projects and factors influencing perceptions of communities about bioenergy projects. The empirical research was carried out on four bioenergy companies in India as case studies. It has been identified that communities have significant influence over bioenergy projects in India. Local air pollution, inappropriate storage of by-products and credibility of developer are identified as some of the important concerns. Local energy needs, benefits to community from bioenergy companies, level of trust on company and relationship between company and the community are some of the prime factors which influence community's perception on bioenergy projects. This research sheds light on important aspects related to community acceptance of bioenergy projects, and this information would help practitioners in understanding the community perceptions and take appropriate actions to satisfy them

  15. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  16. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  17. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  18. A new framework for construction project definition stage

    DEFF Research Database (Denmark)

    Pikas, Ergo; Oehmen, Josef; Koskela, Lauri

    2018-01-01

    One major reason for the poor performance of construction project delivery is related to the 'ill'- performed project definition stage. The emphasis on rational decision-making and methods have stifled the creativity important to problem structuring and solution generation. Problem is in the poor...

  19. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  20. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    : analysis of results of planning the project scope; study of templates of project works’ structures, recommendations for the formation of levels of structure; decomposition of the totality of project work; creating a dictionary of the project work structure; updating the description of the project scope and the project scope management plan. Practical importance. In order to improve the management of the scope of projects in the pharmacy, the components of subprocesses, participants, input and output documents are investigated and the algorithm for managing the project scope is built. It is determined that the starting elements of project scope management are the justification of the initial data, i.e. the project purpose, impacts of the environment and the internal potential of the enterprise in relation to the project implementation (assets of the organizational process. It is recommended to create a structure of project work starting from the analytical research existing at the enterprise or recommended by standards and guidelines on project management approaches to building a hierarchical structure of works, templates of project work structures. It is noted that the created structure of project work should be audited by participants of the project office. According to the results of planning the sequence and duration of operations for managing the scope of works, a precedence diagram of the investigated process is constructed. Value/originality. The developed recommendations regarding the consistency and structure of subprocesses and operations of the project scope management will allow the enterprise to significantly save time for planning the scope of subsequent projects, using the database created in previous periods, statistics on the implementation of the described operations.

  1. Maya Studio Projects Texturing and Lighting

    CERN Document Server

    Lanier, Lee

    2011-01-01

    Learn to create realistic digital assets for film and games with this project-based guide Focused entirely on practical projects, this hands-on guide shows you how to use Maya's texturing and lighting tools in real-world situations. Whether you need to sharpen your skills or you're looking to break into the field for the first time, you'll learn top industry techniques for this important skill as you follow the instructions for several specific projects. You can even create your own version, using final Maya scene files to validate results. The companion DVD includes supplemental videos, proje

  2. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  3. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  4. ADVERTISEMENTS FOR ICT PROJECT MANAGERS SHOW DIVERSITY BETWEEN SWEDISH EMPLOYERS’ AND PROJECT MANAGEMENT ASSOCIATIONS’ VIEWS OF PM CERTIFICATIONS

    Directory of Open Access Journals (Sweden)

    Siw Lundqvist

    2014-05-01

    Full Text Available Appointing ICT project managers is a delicate issue for management; not least since ICT projects are known to be unsuccessful in delivering the required product in time and on budget. Hence, it is even more important to find the “right” individual for the job. According to project management associations, certification in project management is a prerequisite for a project manager’s successful career. The appreciation of project management certifications among Swedish employers was studied using data collected from job advertisements for ICT project managers during four years (2010-2013. Judged on how the advertisements were worded the result indicates surprisingly low interest from the employers’ side, which conflicts with the project management associations statements about the certifications’ indispensable value for successful projects. Furthermore, it conflicts with a common understanding of certifications as essential for appointment as a project manager. The findings identify a possible gap between PM associations’ and employers’ views regarding the certifications’ value, and highlight the necessity of seriously considering whether it is worthwhile for the individuals to strive for, and for the organizations to promote certification, since it is costly in both time, effort and money.

  5. Multi-Agent Modeling in Managing Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    K. Y. Chau

    2009-10-01

    Full Text Available In this paper, a multi-agent model is proposed for considering the human resources factor in decision making in relation to the six sigma project. The proposed multi-agent system is expected to increase the acccuracy of project prioritization and to stabilize the human resources service level. A simulation of the proposed multiagent model is conducted. The results show that a multi-agent model which takes into consideration human resources when making decisions about project selection and project team formation is important in enabling efficient and effective project management. The multi-agent modeling approach provides an alternative approach for improving communication and the autonomy of six sigma projects in business organizations.

  6. The alternative energies, its contribution, importance and projections in the Country

    International Nuclear Information System (INIS)

    Rodriguez P, F.

    1995-01-01

    Colombia is an energetic country, each one of regions have large potentials of at least both renewable or not renewable resources. With the objective of avoiding energetic crisis in the future, different energetic planning studies guided to the development of a sustainable energetic system, evaluations of resource potentials energetic and the technologies development to future applications, must be accomplished. These investigations, they are function of the UPME (Unit of planning of mines and energies), but are considered that the regional entities with the participation of their communities, they should play a role important in this process and on decisions that are taken

  7. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  8. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  9. The Data Rescue @ Home Project

    Science.gov (United States)

    Stickler, A.; Allan, R.; Valente, M. A.; Tinz, B.; Brönnimann, S.

    2012-04-01

    Climate science as a whole as well as reanalyses as a special case can significantly profit from the recovery, imaging and digitisation of historical observations. The importance of this fact is reflected in large, global data rescue projects and initiatives such as the Atmospheric Circulation Reconstructions over the Earth (ACRE, www.met-acre.org) or the EU FP7 ERA-CLIM project (www.era-clim.eu). From the time before 1957, there are still large amounts of surface data e.g. from former colonies and from overseas territories of European countries )e.g. Portugal, France and Germany) that need to be rescued. Also in case of the very early upper-air observations before the 1930s, even Europe and North America still hold an important quantity of data to be recovered in digital form. Here, we present the web platform "Data Rescue @ Home" (www.data-rescue-at-home.org), which has been developed at ETH Zurich and Oeschger Centre for Climate Change Research, and which has been designed to take advantage of the voluntary assistance of the thousands of people on the web who are interested in climate or old weather data. On the website, these volunteers can enter meteorological data shown on digital images into entry masks that resemble the original. By registering, the users get access to their personal digitisation statistics and help optimising the project. At the moment, 4 digitisation projects are online: One project is dealing with German upper-air data from the Second World War period. In a second project, station data from Tulagi (Solomon Islands) is being digitised. Finally, two collaborative projects have been included: One in cooperation with the Instituto Dom Luiz (Univ. Lisbon, Portugal), where Portuguese station data from Angra (Azores) is digitised, and a further one in cooperation with the German Meteorological Service (DWD), in which precipitation data from former German colonies is being digitised. On our poster, we will report on the status of the projects

  10. Regional demand and supply projections for outdoor recreation

    Science.gov (United States)

    Donald B. K. English; Carter J. Betz; J. Mark Young; John C. Bergstrom; H. Ken Cordell

    1993-01-01

    This paper develops regional recreation supply and demand projections, by combining coefficients from the national 1989 RPA Assessment models with regional regressor values. Regional recreation opportunity estimates also are developed, based on regional travel behavior. Results show important regional variations in projections of recreation opportunities, trip supply,...

  11. Mexico: Imports or exports?

    International Nuclear Information System (INIS)

    Estrada, J.

    2002-01-01

    This presentation provides an overview of Mexico's energy sector. Proven oil reserves place Mexico in ninth position in the world and fourth largest in natural gas reserves. Energy is one of the most important economic activities of the country, representing 3 per cent of Gross Domestic Product (GDP). Oil exports represent 8.4 per cent of total exports. Approximately 40 per cent of total public investment is earmarked for energy projects. The author discusses energy resources and energy sector limitations. The energy sector plan for the period 2001-2006 is discussed. Its goals are to ensure energy supply, to develop the energy sector, to stimulate participation of Mexican enterprises, to promote renewable energy sources, and to strengthen international energy cooperation. The regulatory framework is being adapted to increase private investment. Some graphs are presented, displaying the primary energy production and primary energy consumption. Energy sector reforms are reviewed, as are electricity and natural gas reforms. The energy sector demand for 2000-2010 and investment requirements are reviewed, as well as fuel consumption for power generation. The author discusses the National Pipeline System (SNG) and the bottlenecks caused by pressure efficiency in the northeast, flow restriction on several pipeline segments, variability of the Petroleos Mexicanos (PEMEX) own use, and pressure drop on central regions. The entire prospect for natural gas in the country is reviewed, along with the Strategic Gas Program (PEG) consisting of 20 projects, including 4 non-associated natural gas, 9 exploration and 7 optimization. A section dealing with multiple service contracts is included in the presentation. The authors conclude by stating that the priority is a national energy policy to address Mexico's energy security requirements, to increase natural gas production while promoting the diversification of imports, and a regulatory framework to be updated in light of current

  12. Projection computation based on pixel in simultaneous algebraic reconstruction technique

    International Nuclear Information System (INIS)

    Wang Xu; Chen Zhiqiang; Xiong Hua; Zhang Li

    2005-01-01

    SART is an important arithmetic of image reconstruction, in which the projection computation takes over half of the reconstruction time. An efficient way to compute projection coefficient matrix together with memory optimization is presented in this paper. Different from normal method, projection lines are located based on every pixel, and the following projection coefficient computation can make use of the results. Correlation of projection lines and pixels can be used to optimize the computation. (authors)

  13. Quality of educational services in the field of Project management

    Directory of Open Access Journals (Sweden)

    Zlatko Barilović

    2013-12-01

    Full Text Available The growth and development of any business system depends on effectively and successfully implemented projects. Considering that the number of projects worldwide has been constantly increasing, developing project skills in individuals which will be involved in a project is of crucial importance. In the Republic of Croatia, the number of institutions offering education programmes in project management has been steadily growing. Each of these institutions will have to build its competitiveness on the marketing concept. Lately, the quality of educational services has been recognized as an increasingly important element of marketing. One of the education programmes in the field of project management in Croatia is the Specialist Graduate Professional Study Programme in Project Management offered at the Baltazar Adam Krčelić College of Business and Management in Zaprešić. In this paper the authors examine the competitiveness of the above education programme through a survey on the quality of educational service conducted in 2012 with a sample of 202 students with the aim of further defining the guidelines for improvement of its market competitiveness

  14. Tailoring engineering activities to D and D projects - 16056

    International Nuclear Information System (INIS)

    Negin, Charles A.; Urland, Charles S.; Szilagyi, Andrew P.; Collazo, Yvette T.; Santos, Joseph K.; Gladden, John B.

    2009-01-01

    Engineering is an important element of Deactivation and Decommissioning (D and D) project technical planning, scheduling, estimating, and execution. Understanding the scope of engineering and related design, deciding when in a project's schedule these activities should be conducted, and specifying the products to be generated from each engineering task are important management functions. These subjects are addressed in a guidance report developed by the U.S. Department of Energy (DOE) described in this paper. (authors)

  15. Cogeneration for small SAGD projects

    Energy Technology Data Exchange (ETDEWEB)

    Albion, Stuart [AMEC BDR Limited (United Kingdom)

    2011-07-01

    As many SAGD projects are being developed in remote locations, the supply of a steady source of power to them becomes an important question. Connecting these remote facilities to a grid can often be difficult and costly. This presentation, by AMEC BDR Limited, promotes the use of cogeneration in small SAGD projects. Cogeneration is the generation of two forms of energy from one fuel source. In this particular case, the energy forms would be electricity and heat. In many SAGD projects, a gas turbine system is used to generate the electricity, while a heat recovery system is utilized to generate steam. The use of cogeneration systems in SAGD projects, as opposed to using separate heat and electricity systems, has the potential to significantly reduce the amount of energy lost, the amount of emissions and power costs, in addition to ensuring that there is a reliable supply of steam and electricity.

  16. Open Compute Project at CERN

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    The Open Compute Project, OCP ( http://www.opencompute.org/), was launched by Facebook in 2011 with the objective of building efficient computing infrastructures at lowest possible cost. The technologies are released as open hardware design, with the goal to develop servers and data centers following the model traditionally associated with open source software projects. We have been following the OCP project for some time and decided to buy two OCP twin servers in 2013 to get some hands-on experience. The servers have been tested and compared with our standard hardware regularly acquired through large tenders. In this presentation we will give some relevant results from this testing and also discuss some of the more important differences that can matter for a larger deployment at CERN. Finally it will outline the details for a possible project for a larger deployment of OCP hardware for production use at CERN.

  17. Developing Government Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  18. Analysis and control of issues that delay pharmaceutical projects

    Directory of Open Access Journals (Sweden)

    Nallam Sai Nandeswara Rao

    2015-10-01

    Full Text Available Every project will have certain objectives and service levels to be achieved. The success of a project depends on several dimensions like time, cost/budget, quality, etc. and managing a project involves completing the project within time, within budget and with quality to satisfy the users. Because of the significance of health, pharmaceutical companies realized the importance of project management methods and techniques to make available the life saving drugs in time to the needy patients and hospitals. In literature, there is meager information about pharmaceutical project management oriented towards analysis of issues and factors that contribute to the failure or success of projects. This study attempts to analyse different issues that contribute to time delays in pharmaceutical product-based projects, group them under a finite set of prominent factors and identify remedial measures to control those delays. The feedback of project people of some big pharmaceutical firms of Indian sub-continent was collected for this purpose. Exploratory factor analysis (EFA has been used to reduce the reasons for time delays to a limited number of prominent factors and the EFA model has been further examined by confirmatory factor analysis (CFA for its validation. Remedial measures under each factor of time delays have been gathered and a framework designed to mitigate the time delays in pharmaceutical projects. The derived factors that delay the pharmaceutical projects include resource, monitoring & control, scheduling and planning problems. Important remedial measures like blended resource approach, estimation and forecast of shortage of labour and skills, regular quality training, etc. have been recommended.

  19. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  20. Project financing versus corporate financing under asymmetric information

    OpenAIRE

    Anton Miglo

    2008-01-01

    In recent years financing through the creation of an independent project company or financing by non-recourse debt has become an important part of corporate decisions. Shah and Thakor (JET, 1987) argue that project financing can be optimal when asymmetric information exists between firm's insiders and market participants. In contrast to that paper, we provide an asymmetric information argument for project financing without relying on corporate taxes, costly information production or an assump...

  1. Project AccessIT, Digitalization in Museums and Europeana (European Digital Library Project

    Directory of Open Access Journals (Sweden)

    Latif Özen

    2011-03-01

    Full Text Available This article emphasizes the importance of digitizing museum inventory records and establishing a data set in solving the problems of collection management in the museums of Turkey. Besides, the museum staff is encouraged to share the already existing digital content at the Europeana Digital Culture Portal by means of AccessIT project.

  2. Guide of good practices for methanization projects

    International Nuclear Information System (INIS)

    Delatte, Constant; Orozco-Souel, Paola; Rouxel, Anaick; Tanneau, Patrick; Schreiber, Konrad; Jaubert, Jean Noel; Micone, Philippe; Dionne, Denis; Renner, Christophe; Ollivier, Denis

    2011-12-01

    This guide aims at providing project holders with guidance on factors which may influence social acceptability of methanization projects and with recommendations regarding communication and dialogue for a better project integration, with a technical support in order to guarantee project quality for a minimised environmental impact, and at convincing and reassuring local communities which plan to implement a methanization project, notably with respect to issues like odours, safety or landscape integration. The guide first outlines the importance of a serious and credible approach, and aims project holders at demonstrating an actual reasonable economic control of energy, environmental and social issues related to their project. The second part proposes technical solutions regarding the limitation of impact on air quality, preservation and restoration of soil quality and water resources, landscape integration, transport management and noise prevention. Feedbacks on experiences with different types of installations (agricultural, industrial, and so on) are also provided. A good practice charter is finally proposed

  3. Project management skills for nuclear power plants

    International Nuclear Information System (INIS)

    Bhatikar, R.J.

    2002-01-01

    Full text: The E and C Division of L and T has executed several power projects in India and abroad and thus possesses the requisite wherewithal to execute nuclear power projects on a fast track basis. To achieve this L and T has set up a separate Strategic Business Unit (SBU) to have a focused attention to the nuclear power industry in the country. All the four important and necessary hallmarks for successful implementation of any project namely (i) engineering capabilities, (ii) sophisticated project management tools, (iii) ability to mobilize resources, and (iv) skilled personnel to execute the project have been adequately addressed. These could be realized either by establishing fruitful collaborations with other specialist Companies and/or creating powerful and multitasking software tools for effective implementation. The execution of nuclear power projects on a fast track basis could be implemented by following the EPC route and by minimizing the number of packages. Details of this scheme for project implementation will be highlighted during the talk

  4. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  5. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  6. Orchestrating Information Sharing among Intra- And Inter-Organisational Core Actors in a Large New Product Development Project - The Particular Role of The Project Manager

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde

    The success of NPD projects of high-cost, engineering-intensive, and customized development products is largely dependent on information sharing with actors from customers regarding their specific requirements (Von Hippel, 1986). But information sharing is also necessary among actors from different...... information sharing among other intra- or inter-organisational actors during the progression of an NPD project. In other words, this study emphasises the importance of the PM’s relationships on a day-to-day basis in information sharing among intra- and inter-organisational actors during the phases of an NPD...... organisations. Further, the findings show that to orchestrate the information sharing during the NPD project, the PM relies on relationships with several core intra-organisational actors who are particularly important to the orchestrating of information sharing during the early phases of the NPD project...

  7. PORTNUS Project

    Energy Technology Data Exchange (ETDEWEB)

    Loyal, Rebecca E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  8. All projects related to | Page 525 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Networks : Empowering Communities through Telecentre Networking. Project ... IDRC institutional support over the period 2003-2006 (project 102095) enabled the Educational Research Network for West and Central Africa (ERNWACA) to carry out research that made an important ... Program: Agriculture and Food Security.

  9. The Hodge theory of projective manifolds

    CERN Document Server

    de Cataldo, Mark Andrea

    2007-01-01

    This book is a written-up and expanded version of eight lectures on the Hodge theory of projective manifolds. It assumes very little background and aims at describing how the theory becomes progressively richer and more beautiful as one specializes from Riemannian, to Kähler, to complex projective manifolds. Though the proof of the Hodge Theorem is omitted, its consequences - topological, geometrical and algebraic - are discussed at some length. The special properties of complex projective manifolds constitute an important body of knowledge and readers are guided through it with the help of selected exercises. Despite starting with very few prerequisites, the concluding chapter works out, in the meaningful special case of surfaces, the proof of a special property of maps between complex projective manifolds, which was discovered only quite recently.

  10. Resilience in children: the nature and the importance of the concept

    Directory of Open Access Journals (Sweden)

    Emory L. Cowen

    Full Text Available Considers the meaning of the term childhood resilience and the importance ofits place in the fields of developmental psychopathology and wellness enhancement. Reviews several major longitudinal research projects on childhood resilience that have contributed significantly to the field's emergence and presents more detailed information on the Rochester Child Resilience Project (RCRP. A final section summarizes accomplishments in resilience research to date, and identifies needed foci for future work in this area.

  11. Marine radioecology. Final reports from sub-projects within the Nordic nuclear safety research project EKO-1

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2001-04-01

    This report contains a collection of eight papers describing research done in the NKS/EKO-1 project. It also contains a preface giving a summary of the results. The EKO-1 project as a whole has been described in the report NKS(97)FR4. The aim of the project was to make a joint Nordic study on radionuclides in sediments and water and the interaction between these two phaseS. Relatively less emphasis had been put on this factor compared to others in previous Nordic studies on marine radioecology. For some of the participating countries this work was the first of its kind undertaken. The project involved field, laboratory and model studies. The work and results helped to highlight the important role of sediments when assessing the consequences of real or possible releases of radionuclides to the marine environment (au)

  12. Reacting plasma project at IPP Japan

    International Nuclear Information System (INIS)

    Miyahara, A.; Momota, H.; Hamada, Y.; Kawamura, K.; Akimune, H.

    1981-01-01

    Contributed papers of the seminar on burning plasma held at UCLA are collected. Paper on ''overview of reacting plasma project'' described aim and philosophy of R-Project in Japan. Paper on ''Burning plasma and requirements for design'' gave theoretical aspect of reacting plasma physics while paper on ''plasma container, heating and diagnostics'' treated experimental aspect. Tritium handling is essential for the next step experiment; therefore, paper on ''Tritium problems in burning plasma experiments'' took an important part of this seminar. As appendix, paper on ''a new type of D - ion source using Si-semiconductor'' was added because such an advanced R and D work is essential for R-Project. (author)

  13. The Importance of Communication in Quality Management

    OpenAIRE

    Anca Cristina Stanciu; Elena Condrea; Cristina Zamfir

    2016-01-01

    From a managerial perspective, communication is regarded as a process of understandingamong people by means of information exchange. According to the principle “quality starts withthe manager”, his role becomes crucial, one of the main traits of the manager’s behaviour beingthe ability to communicate effectively.Important in any aspect of quality management,communication plays an essential role in developing business projects. As a component of publicrelations, although less spectacular than ...

  14. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  15. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  16. Understanding map projections: Chapter 15

    Science.gov (United States)

    Usery, E. Lynn; Kent, Alexander J.; Vujakovic, Peter

    2018-01-01

    It has probably never been more important in the history of cartography than now that people understand how maps work. With increasing globalization, for example, world maps provide a key format for the transmission of information, but are often poorly used. Examples of poor understanding and use of projections and the resultant maps are many; for instance, the use of rectangular world maps in the United Kingdom press to show Chinese and Korean missile ranges as circles, something which can only be achieved on equidistant projections and then only from one launch point (Vujakovic, 2014).

  17. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  18. Telemedicine and primary health: The virtual doctor project Zambia

    OpenAIRE

    Mupela, Evans; Mustarde, Paul; Jones, Huw

    2011-01-01

    This paper is a commentary on a project application of telemedicine to alleviate primary health care problems in Lundazi district in the Eastern province of Zambia. The project dubbed 'The Virtual Doctor Project' will use hard body vehicles fitted with satellite communication devices and modern medical equipment to deliver primary health care services to some of the neediest areas of the country. The relevance and importance of the project lies in the fact that these areas are hard-to-reach d...

  19. An important day for European science

    CERN Document Server

    2009-01-01

    Today is an important day for the future of European science. It is the day on which CERN’s relationship with the European Union reaches maturity. Ever since the early 1950s, CERN and the European project have grown together. CERN was a child of the European movement: the first discussions at Denis de Rougemont’s European Cultural Conference in Lausanne in 1949 led directly to the foundation of CERN in 1954. More recently, the European Union has become an Observer at the CERN Council, links between CERN and the EU have strengthened as Europe has pursued the goal of creating a European Research Area, and CERN has benefited from European support for projects as varied as Grid computing and future accelerator R&D, not forgetting, of course, the numerous Marie Curie fellows whose careers have received a boost thanks to European funds. Today, that collaboration goes one step further with the signature of a Memorandum of Understanding between CERN and the European C...

  20. The History Research Project

    Science.gov (United States)

    Estes, Matt; Brady, Ann

    2005-01-01

    Matt Estes, a social studies teacher, mentions the main instructional goals for his students like understanding the importance of proper citation and attribution presenting the Machiavelli project that deals with the skills he wants his students to develop and the course material that must be covered. In addition, Ann Brady, a library media…

  1. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  2. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  3. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  4. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  5. Impact of Stakeholder Psychological Empowerment on Project Success

    Directory of Open Access Journals (Sweden)

    Herry Pintardi Chandra

    2011-05-01

    Full Text Available The relationship between psychological empowerment of stakeholders and project success is an important thing that must be known by project manager. This research developed and tested the model to predict how well the impact of stakeholder psychological empowerment on project success. Stakeholder psychological empowerment was defined to have five indicator variables covering intrinsic motivation, opportunity to perform, ability to perform, task behaviors, and contextual behaviors. Meanwhile, project success can be measured by cost performance, time performance, quality performance, profitability, and customer satisfaction. In this study, it was hypothesized that stakeholder psychological empowerment influenced project success. Based on the data obtained from a questionnaire survey carried out to 204 respondents, structural equation modeling (SEM was used for predicting the performance of project success. It was found that stakeholder psychological empowerment influenced project success, especially on the ability to perform of stakeholders.

  6. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  7. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  8. Myoglobin Structure and Function: A Multiweek Biochemistry Laboratory Project

    Science.gov (United States)

    Silverstein, Todd P.; Kirk, Sarah R.; Meyer, Scott C.; Holman, Karen L. McFarlane

    2015-01-01

    We have developed a multiweek laboratory project in which students isolate myoglobin and characterize its structure, function, and redox state. The important laboratory techniques covered in this project include size-exclusion chromatography, electrophoresis, spectrophotometric titration, and FTIR spectroscopy. Regarding protein structure,…

  9. FORMATION OF RESPONSIBILITY AS A BEHAVIORAL SPECIALIST COMPETENCE IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Олександр Семенович ПОНОМАРЬОВ

    2016-02-01

    Full Text Available The essence of the phenomenon of responsibility is considered. It plays an important role in the life of man and society. A sense of personal responsibility is essential for professional project management. However, with respect to the standard IPMA behavioral competencies of the specialist does not consider responsibility as a competence. This article explains the need to consider the responsibility of one of the most important behavioral competencies of project management specialists. The paper analyzes the problem of studying the phenomenon of responsibility. Examples of his studies in philosophy, psychology, and pedagogy. The approaches to the formation and development of students' responsibility. Emphasized the lack of an integrated system of education accountability in higher education. Illuminated by the author's practical experience in the formation and development of responsibility in the process of teaching of the discipline "managerial competence". In particular, the standard program is supplemented with important topics of the course on the philosophy of management, psychology, management and culture management. It is shown that the effective formation of responsibility of students is necessary to ensure the integrity of the system of educational process and consistently apply active learning methods. It was stressed that the responsibility is required professionally and socially important personal characteristics of a person. This primarily relates to the project and to the members of his project team. It is proposed to include responsibility in behavioral specialist competencies in project management as one of the most important components.

  10. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  11. Freedom and Responsibility in Synthetic Genomics: The Synthetic Yeast Project.

    Science.gov (United States)

    Sliva, Anna; Yang, Huanming; Boeke, Jef D; Mathews, Debra J H

    2015-08-01

    First introduced in 2011, the Synthetic Yeast Genome (Sc2.0) PROJECT is a large international synthetic genomics project that will culminate in the first eukaryotic cell (Saccharomyces cerevisiae) with a fully synthetic genome. With collaborators from across the globe and from a range of institutions spanning from do-it-yourself biology (DIYbio) to commercial enterprises, it is important that all scientists working on this project are cognizant of the ethical and policy issues associated with this field of research and operate under a common set of principles. In this commentary, we survey the current ethics and regulatory landscape of synthetic biology and present the Sc2.0 Statement of Ethics and Governance to which all members of the project adhere. This statement focuses on four aspects of the Sc2.0 PROJECT: societal benefit, intellectual property, safety, and self-governance. We propose that such project-level agreements are an important, valuable, and flexible model of self-regulation for similar global, large-scale synthetic biology projects in order to maximize the benefits and minimize potential harms. Copyright © 2015 by the Genetics Society of America.

  12. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Small, R. Justin [Woods Hole Oceanographic Institution, MA (United States); Bryan, Frank [Woods Hole Oceanographic Institution, MA (United States); Tribbia, Joseph [Woods Hole Oceanographic Institution, MA (United States); Park, Sungsu [Woods Hole Oceanographic Institution, MA (United States); Dennis, John [Woods Hole Oceanographic Institution, MA (United States); Saravanan, R. [Woods Hole Oceanographic Institution, MA (United States); Schneider, Niklas [Woods Hole Oceanographic Institution, MA (United States); Kwon, Young-Oh [Woods Hole Oceanographic Institution, MA (United States)

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  13. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  14. The Pediatric Cancer Genome Project

    Science.gov (United States)

    Downing, James R; Wilson, Richard K; Zhang, Jinghui; Mardis, Elaine R; Pui, Ching-Hon; Ding, Li; Ley, Timothy J; Evans, William E

    2013-01-01

    The St. Jude Children’s Research Hospital–Washington University Pediatric Cancer Genome Project (PCGP) is participating in the international effort to identify somatic mutations that drive cancer. These cancer genome sequencing efforts will not only yield an unparalleled view of the altered signaling pathways in cancer but should also identify new targets against which novel therapeutics can be developed. Although these projects are still deep in the phase of generating primary DNA sequence data, important results are emerging and valuable community resources are being generated that should catalyze future cancer research. We describe here the rationale for conducting the PCGP, present some of the early results of this project and discuss the major lessons learned and how these will affect the application of genomic sequencing in the clinic. PMID:22641210

  15. Wind energy projects: Some reservations

    International Nuclear Information System (INIS)

    Veldkamp, H.F.; Goezinne, F.

    1991-01-01

    Among people directly involved in wind energy great optimism about the use of windpumps is not uncommon. Projects show that often this is not justified. Why do windpump projects fail? Errors seen by the authors are: 1. Windpumps are installed only because policy makers or researchers want it and not because there is a need felt for them by the users; 2. There is too much attention for the technical side and not for other, more important problems; 3. Experimental (and hence unreliable) windpumps are used in projects; and 4. Too much weight is attached to small, long term economic advantages, which do not count in reality. Although the windmill has its place, it should be recognized that in many cases wind energy is not a good option. 15 refs

  16. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  17. Mining student capstone projects with FRASR and ProM

    NARCIS (Netherlands)

    Poncin, W.; Serebrenik, A.; Brand, van den M.G.J.

    2011-01-01

    Capstone projects are commonly carried out at the end of an undergraduate program of study in software engineering or computer science. While traditionally such projects solely focussed on the software product to be developed, in more recent work importance of the development process has been

  18. Effective Teaching Methods--Project-based Learning in Physics

    Science.gov (United States)

    Holubova, Renata

    2008-01-01

    The paper presents results of the research of new effective teaching methods in physics and science. It is found out that it is necessary to educate pre-service teachers in approaches stressing the importance of the own activity of students, in competences how to create an interdisciplinary project. Project-based physics teaching and learning…

  19. Accounting Early for Life Long Learning: The AcE Project.

    Science.gov (United States)

    University Coll. Worcester (England). Centre for Research in Early Childhood Education.

    Building upon the work of the Effective Early Learning (EEL) Project in raising the quality of early learning for young children in the United Kingdom, the 3-year Accounting Early for Life Long Learning Project (AcE Project) focuses on enhancing in 3- to 6-year-olds those attitudes and dispositions that are important to life-long learning. This…

  20. Appreciating the Complexity of Project Management Execution: Using Simulation in the Classroom

    Science.gov (United States)

    Hartman, Nathan S.; Watts, Charles A.; Treleven, Mark D.

    2013-01-01

    As the popularity and importance of project management increase, so does the need for well-prepared project managers. This article discusses our experiences using a project management simulation in undergraduate and MBA classes to help students better grasp the complexity of project management. This approach gives students hands-on experience with…

  1. Social Class and Group Size as Predictors of Behavior in Male Equus kiang

    Directory of Open Access Journals (Sweden)

    Prameek M. Kannan

    2017-11-01

    Full Text Available Ethograms provide a systematic approach to identify and quantify the repertoire of behaviors of an organism. This information may assist animal welfare in zoos, increase awareness of conservation needs, and help curb high-risk behaviors during human-wildlife conflict. Our primary objective was to utilize an equid ethogram to produce activity budgets for Equus kiang males, a social ungulate that is among the least-studied mammals worldwide, and unknown to the ethological literature. We recently reported the existence of three social classes of this species; Territorial males, Bachelor males and ‘Transient’ males. Therefore, our secondary objective was to compare activity budgets in each of these three groups. We found that kiang spent >70% of their time performing six behaviors: vigilance (34%, locomotion (24.2%, resting (14.2%, mixed foraging (12.5%, browsing (5.1%, and antagonism (1.1%. Over 2% of the total behavioral investment was spent on olfactory investigations (genital sniffing, sniffing proximity and flehmen. Eleven of the eighteen behaviors differed by class. Habitat selection differed strongly by each group, with Territorial males favoring mesic sites with greater vegetation abundance. Vigilance also differed according to habitat selection, but not group size. Animals in the xeric, least vegetation-rich area were far less vigilant than animals at more attractive sites. We found that the full repertoire of behaviors, and relative investments in each, differ according to social class. These findings are a reminder that researchers should make every effort to disambiguate social class among ungulates– and other taxa where behaviors are class-dependent.

  2. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  3. A policy for development of project management. Projektijuhtimise arendamise poliitika

    Directory of Open Access Journals (Sweden)

    Arvi Kuura

    2013-01-01

    Full Text Available The share of temporary tasks and activities organised through projects and/or programmes is increasing in modern societies and also in businesses, non-profit and public organisations. To manage an increasing load of projects and programmes, the majority of organisations employ more skilled project management professionals and develop their project management capabilities. Against that background, most governments globally have not paid much attention to the development of project management. In other words, the project management capability (or maturity has not been a macro-level or policy concern. The article explores the importance of project management capabilities and the need for suitable policies, and outlines a policy for the development of project management

  4. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  5. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  6. Project Exodus

    Science.gov (United States)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  7. Capital effectiveness in a capital intensive project

    Energy Technology Data Exchange (ETDEWEB)

    Yarossi, M.E. (IPA Institute, The Hague (Netherlands))

    2009-07-01

    The technical difficulty of incorporating new technology in capital intensive projects has been underestimated. Bio-refineries projects are no exemption. These projects in many occasions have assigned inadequate project resources, such as lean project teams and overly optimistic contingencies. Furthermore, project developers have set unrealistic expectations; for example: aggressive schedule duration, low cost targets and optimistic operability targets. These project drivers set before project's authorization compromise the project's outcome. In many cases, this translates into lower return on investment, higher costs, and lower operability. In order to counteract these outcomes, it is critical for capital intensive projects, like bio-refineries, to have a well define project which will enable to increase its chance of success. IPA's research has shown that bio-refineries projects have poor project performance due to poor project practices, lack of owner project controls and inadequate change management. An adequate risk analysis during definition is a critical component of a project's success, especially when there is new technology, like biomass conversion. It is of outmost importance to asses this technology and set realistic expectations. parallel to this, there is a need to have a well established execution strategy, which should be maintained throughout the execution of the project. In conclusion, IPA's research has indicated that bio-refineries, as any other capital intensive project, need to assign adequate resources at an early state of project development, by making sure there is and adequate team in place, reasonable schedule, technical difficulties evaluation, and keeping control during execution. Although these elements might be seen as common practices that should be taken into account when developing a project, many projects being their execution without having a proper foundation, and thus affecting the project

  8. THE SOCIO-ECONOMIC IMPORTANCE OF PROGRAMS FOR THE FINANCING OF CROSS-BORDER COOPERATION

    Directory of Open Access Journals (Sweden)

    Mioara BORZA

    2015-12-01

    Full Text Available The topic of European funding shows a great interest for present and, especially, for the future. The common problems of areas implied in the cross-border programs are correlated to socio-economic development of communities. By this paper we propose an analysis, by inventory type, descriptive and qualitative, of implemented projects and of the perspectives for projects in 2014-2020 period. The results of paper consist in identification of solid arguments about the importance and necessity of these programmes and projects.

  9. Teaching, Doing, and Sharing Project Management in a Studio Environment: The Development of an Instructional Design Open-Source Project Management Textbook

    Science.gov (United States)

    Randall, Daniel L.; Johnson, Jacquelyn C.; West, Richard E.; Wiley, David A.

    2013-01-01

    In this article, the authors present an example of a project-based course within a studio environment that taught collaborative innovation skills and produced an open-source project management textbook for the field of instructional design and technology. While innovation plays an important role in our economy, and many have studied how to teach…

  10. The life cycle of a genome project: perspectives and guidelines inspired by insect genome projects.

    Science.gov (United States)

    Papanicolaou, Alexie

    2016-01-01

    Many research programs on non-model species biology have been empowered by genomics. In turn, genomics is underpinned by a reference sequence and ancillary information created by so-called "genome projects". The most reliable genome projects are the ones created as part of an active research program and designed to address specific questions but their life extends past publication. In this opinion paper I outline four key insights that have facilitated maintaining genomic communities: the key role of computational capability, the iterative process of building genomic resources, the value of community participation and the importance of manual curation. Taken together, these ideas can and do ensure the longevity of genome projects and the growing non-model species community can use them to focus a discussion with regards to its future genomic infrastructure.

  11. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  12. PROJECT “5-100”: SOME INTERIM RESULTS

    Directory of Open Access Journals (Sweden)

    Г А Ключарев

    2018-12-01

    Full Text Available The tasks of modernization and development of education and science are of a key im-portance for the Russian Federation. Despite a number of significant changes in the Russian system of education and science over the last 10-15 years, the best Russian universities still cannot compete with the world leading universities. In 2013, to change this situation the state started one of its most ambitious projects to increase the international competitiveness of Russian universities, which is the project “5-100”. Though the need for such projects for the development of science and education is widely acknowledged, the “5-100” has received contradictory estimates of different stakeholders and experts. By 2017, the project approached its half-time line and spent a significant part of its resources, thus, it is time to consider its interim results. Moreover, the today’s close attention to the project determined numerous speculations not only in the media but also in scientific articles aiming to assess the project’s impact on the Russian system of education and science based on ideological and political judgments. The authors understand and accept all informed judgments but emphasize the importance of evaluating both reasons for such large-scale projects and factors affecting their implementations. A superficial estimate of the project “5-100” leads to the em-phasis on its minor disadvantages, which usually hides its less obvious positive sides. Thus, the article focuses on the role of the project “5-100” in the modernization of the Russian system of education and science, considers its different aspects, and identifies possible approaches to assess its efficiency at the final stages of its implementation (or to develop new projects to increase the international competitiveness of Russian universities.

  13. Exact angular momentum projection based on cranked HFB solution

    Energy Technology Data Exchange (ETDEWEB)

    Enami, Kenichi; Tanabe, Kosai; Yosinaga, Naotaka [Saitama Univ., Urawa (Japan). Dept. of Physics

    1998-03-01

    Exact angular momentum projection of cranked HFB solutions is carried out. It is reconfirmed from this calculation that cranked HFB solutions reproduce the intrinsic structure of deformed nucleus. The result also indicates that the energy correction from projection is important for further investigation of nuclear structure. (author)

  14. All projects related to | Page 115 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Topic: POLICE, RESEARCH, POLICY MAKING, ASIA ... Through case studies in Uganda, this project will test dominant international and government ... This project addresses the lack of quantitative and qualitative employment data for ... The coastal area of Cartagena, an important tourist destination in Colombia, is home to ...

  15. Cultural humility and the importance of long-term relationships in international partnerships.

    Science.gov (United States)

    Foster, Jennifer

    2009-01-01

    This article describes an education, leadership, and health professional interchange project in the Dominican Republic. It emphasizes the importance of long-term relationships and explores how over time, dialogue has led to cultural humility, self-reflection, and empowerment among nursing colleagues across national boundaries, despite differences in assumptions. The project is an example of a north-south collaboration encouraged by the World Health Organization to strengthen nursing and midwifery globally.

  16. CRITICAL SUCCESS FACTORS FOR INFRASTRUCTURE EUROPEAN FUNDED PROJECTS

    Directory of Open Access Journals (Sweden)

    Sebastian-Ion Ceptureanu

    2016-07-01

    Full Text Available Absorption of European funds is on top of Romania’s public agenda for the last years although the first programming period has ended and the necessary lessons were learned so far. To have a high degree of absorption of funds provided by the EU must be of quality projects and their implementation to be successful. Through this work we aimed to investigate the success factors of infrastructure projects with European funding in Romania, Bulgaria, Moldova, Ukraine, Serbia and Kosovo, and identify critical success factors of these projects through a research surveying the teams of consultants and support personnel from the countries in an international consulting company. The research results are therefore constitute the empirical evidence of what constitutes critical success factors of infrastructure projects financed by the European Union and can be used as a starting point for scientific studies of the management of European projects or other actions that investigates measures that can be taken to improve the success rate of projects implemented in the area mentioned above.One of the contributions of this paper is to identify the critical success factors of success factors present in literature. With more so as they are critical success factors of infrastructure projects with European funding still required field studies and analysis performed in the present context. In addition, the critical factors were operationalized in a conceptual framework. Moreover, this framework includes leadership style of project manager as critical success factor has been identified in the research as the most important in the context in which it was conducted. As such, this paper demonstrates, with the necessary limitations, the importance of management style of project managers in the context of specific European funded infrastructure projects. And this is happening even though there are sophisticated project management tools availabe and relevant knowledge exists

  17. Goleman-Boyatzis Model of Emotional Intelligence for Dealing with Problems in Project Management

    Directory of Open Access Journals (Sweden)

    Peter Vincent Livesey

    2017-03-01

    Full Text Available As projects grow in size and complexity the sizes of teams needed to manage them also increases. This places greater emphasis on the need for the project manager to develop people management skills, commonly called soft skills, of which emotional intelligence (EI has been recognised as an important component. The objective of this research was to investigate the relevance of the Goleman-Boyatzis model of EI in dealing with the problems in large projects identified via a literature review. To achieve this end, a Delphi study using project managers who had been involved in the management of projects in excess of $500 million was used. The responses from the Delphi panel were analysed and the results showed that the competencies contained in the Goleman-Boyatzis model had a relevance of 95% or greater to the problems presented to the panel. A ranking of the various competencies contained within the model was also developed, some competencies being found to be more important than others. By confirming the importance of emotional intelligence, as described by the model, this research adds to the understanding of the necessary skills needed by a project manager to successfully manage large projects.

  18. How is it going? Peformance assessment in major projects

    DEFF Research Database (Denmark)

    Maylor, Harvey; Johnson, Mark; Turner, Neil

    2017-01-01

    an enhanced service performance model. This was then tested using a survey and a structural equation model derived. Development of this yielded new classifications but most importantly, provided a more meaningful method for measuring the performance of operational transformation projects. Specifically......Determining the performance of a major project is a challenge for both practitioners and scholars. In the context of operational change projects the challenge is exacerbated by the service-intensive nature of the transformation, temporal disconnects between contracting and delivery and lack...... management in major projects from an OM perspective....

  19. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  20. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  1. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  2. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  3. An empirical study on key factors for purchasing strategy on project based organizations: A case study of gas field development projects

    Directory of Open Access Journals (Sweden)

    Aboulfazl Kazazi

    2012-08-01

    Full Text Available One of the primary concerns in development of oil and gas resources is to find the critical success factors associated with different important projects. Purchasing and procurement plays a key role in these projects. There is no doubt that in history of similar studies, there are not much studies to determine key factors. The proposed study of this paper presents an empirical study to find these factors in one of the most important gas filed in Iran is now South Pars Gas Field. The study distributes a questionnaire consists of various questions associated with purchasing activities. We investigate the feedbacks gathered from decision makers using factor analysis. The results of our survey reveal that there are three categories of organizational strategy, the relative importance of strategy and risk according to factor analysis. Each factor consists of many other factors and the relative importance of all factors are investigated.

  4. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  5. Leadership success within disaster restoration projects.

    Science.gov (United States)

    Rapp, Randy R; Baroudi, Bassam

    2014-01-01

    Successful project managers draw their performance from essential leadership traits, as guided by their core values.Within disaster recovery, contractors who mitigate, repair, and reconstruct the built environment are often faced with challenges exceeding the norm. The effective leader is commonly expected to consider stakeholder motivations within distressing situations as well as other external and environmental factors when seeking to lead the project team to successful outcomes. This research is most concerned with leadership within the context of disaster restoration of the built environment. Its stimulus comes from the Restoration Industry Association (RIA)'s efforts to highlight leadership traits and core values for its Certified Restorer Body of Knowledge but would be of value to others associated with disaster recovery operations. Among organizations whose membership includes thousands of practitioners who restore and reconstruct the built environment after disasters, the RIA is the only one yet to formally and substantially research which core values and leader traits are deemed critical for the success of efforts to manage the means and methods applied on recovery job sites. Forty-six seasoned disaster restoration industry project professionals voluntarily responded to a survey questionnaire that sought their opinions about the traits and core values that they consider most important for successful disaster restoration project leadership. The most important leader traits were effective communication, professional competence, and leadership by example. The most important restoration industry values were integrity, compassion, and trustworthiness. The recognized imperative of compassion was unexpected in light of stereotypes often associated with construction-related contractors. This and other findings permit disaster response and recovery stakeholders to better understand qualities they should wish to see in leaders of contractor organizations, which

  6. How and Why Do Top Managers Support or Not Support Strategic IS Projects?

    NARCIS (Netherlands)

    Boonstra, A.; CruzCunha, MM; Varajao, J; Powell, P; Martinho, R

    2011-01-01

    There is much evidence that top management support is the single most important determinant of IS project success. This is especially the case in complex and large-scale IS projects. Surprisingly however, despite its crucial importance there is only limited knowledge of the types of behaviour

  7. Student and Faculty Outcomes of Undergraduate Science Research Projects by Geographically Dispersed Students

    Science.gov (United States)

    Shaw, Lawton; Kennepohl, Dietmar

    2013-01-01

    Senior undergraduate research projects are important components of most undergraduate science degrees. The delivery of such projects in a distance education format is challenging. Athabasca University (AU) science project courses allow distance education students to complete research project courses by working with research supervisors in their…

  8. Success and fail factors in sustainable real estate renovation projects

    NARCIS (Netherlands)

    Volker, L.

    2011-01-01

    Sustainability remains an important issue for the construction industry. Yet, sustainable real estate developments are still considered as highly ambitious projects. To find out how and why sustainable renovation projects actually became sustainable we systematically evaluated 21 leading Dutch real

  9. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  10. Attitudes of Registered and Licensed Practical Nurses About the Importance of Families in Surgical Hospital Units: Findings From the Landspitali University Hospital Family Nursing Implementation Project.

    Science.gov (United States)

    Blöndal, Katrin; Zoëga, Sigridur; Hafsteinsdottir, Jorunn E; Olafsdottir, Olof Asdis; Thorvardardottir, Audur B; Hafsteinsdottir, Sigrun A; Sveinsdóttir, Herdis

    2014-08-01

    The purpose of this study was to examine attitudes of registered nurses and licensed practical nurses about the importance of the family in surgical hospital units before (T1) and after (T2) implementation of a Family Systems Nursing educational intervention based on the Calgary Family Assessment and Intervention Models. This study was part of the Landspitali University Hospital Family Nursing Implementation Project and used a nonrandomized, quasi-experimental design with nonequivalent group before and after and without a control group. There were 181 participants at T1 and 130 at T2. No difference was found in nurses' attitudes as measured by the Families Importance in Nursing Care-Nurses' Attitudes (FINC-NA) questionnaire, before and after the educational intervention. Attitudes toward families were favorable at both times. Analysis of demographic variables showed that age, work experience, and workplace (inpatient vs. outpatient units) had an effect on the nurses' attitudes toward families. The influence of work experience on attitudes toward family care warrants further exploration. © The Author(s) 2014.

  11. 19th International Congress on Project Management and Engineering

    CERN Document Server

    Blanco, José; Capuz-Rizo, Salvador

    2017-01-01

    This book gathers the best papers presented at the 19th International Congress on Project Management and Engineering, which was held in Granada, Spain in July 2015. It covers a range of project management and engineering contexts, including: civil engineering and urban planning, product and process engineering, environmental engineering, energy efficiency and renewable energies, rural development, information and communication technologies, safety, labour risks and ergonomics, and training in project engineering. Project management and engineering is taking on increasing importance as projects continue to grow in size, more stakeholders become involved, and environmental, organisational and technological issues become more complex. As such, this book offers a valuable resource for all professionals seeking the latest material on the changing face of project management.

  12. Association between postgraduate year 2 residency program characteristics and primary project publication.

    Science.gov (United States)

    Swanson, Joseph M; Shafeeq, Hira; Hammond, Drayton A; Li, Chenghui; Devlin, John W

    2018-03-15

    The association among residency program and research mentor characteristics, program director perceptions, and the publication of the primary research project for postgraduate year 2 (PGY2) graduates was assessed. Using a validated electronic survey, residency program directors (RPDs) of critical care PGY2 graduates were asked about primary research project publication success, program and research project mentor characteristics, and RPDs' perceptions surrounding project completion. All 55 RPDs surveyed responded; 44 (79%) reported being a research project mentor. PGY2 research project publications in 2011 and 2012 totaled 26 (37%) and 27 (35%), respectively. A significant relationship existed between research project publication and the number of residents in the program ( p project publication is important to their employer ( p projects versus no publications included the number of graduates in the PGY2 program (odds ratio [OR], 5.6; p project publication (OR, 10.2; p project versus no research projects was also independently associated with the RPD's perception that the employer valued research project publication (OR, 5.1; p = 0.04). A survey of RPDs of critical care PGY2 residents found that the number of PGY2 residents, the number of publications by the least experienced research mentor, and the perception that publishing the residents' research projects is important to the employer were independently associated with publication rates of residency research projects. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  13. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  14. Progress report for project modeling Arctic barrier island-lagoon system response to projected Arctic warming

    Science.gov (United States)

    Erikson, Li H.; Gibbs, Ann E.; Richmond, Bruce M.; Storlazzi, Curt; B.M. Jones,

    2012-01-01

    Changes in Arctic coastal ecosystems in response to global warming may be some of the most severe on the planet. A better understanding and analysis of the rates at which these changes are expected to occur over the coming decades is crucial in order to delineate high-priority areas that are likely to be affected by climate changes. In this study we investigate the likelihood of changes to habitat-supporting barrier island – lagoon systems in response to projected changes in atmospheric and oceanographic forcing associated with Arctic warming. To better understand the relative importance of processes responsible for the current and future coastal landscape, key parameters related to increasing arctic temperatures are investigated and used to establish boundary conditions for models that simulate barrier island migration and inundation of deltaic deposits and low-lying tundra. The modeling effort investigates the dominance and relative importance of physical processes shaping the modern Arctic coastline as well as decadal responses due to projected conditions out to the year 2100.

  15. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  16. Project-Based Organizations and the New Spirit of Capitalism

    DEFF Research Database (Denmark)

    Jagd, Søren

    Luc Boltanski and Eve Chiapello’s analysis of recent changes in capitalism – Le nouvel esprit du capitalisme - is an important contribution to the sociological analysis of capitalism. The aim of this paper is to present their main argument. It is argued that a particular important aspect...... of their analysis is the ideal-typical model of the new spirit of capitalism, the ideological underpinning of project-based organizations in ‘The Project World’. It is argued that the ideal-typical model of the Project World is the most elaborated description of the ‘cultural code’ of the emergent form...... of capitalist organizations. Last, it is discussed how we may obtain empirical evidence to test the hypothesis of a major change in capitalist organizational forms as well as in the recent spirit of capitalism....

  17. D6.4 Implementation: Project Knowledge Management

    DEFF Research Database (Denmark)

    Dolog, Peter; Durao, Frederico; Jahn, Karsten

    2009-01-01

    This report presents the prototype for the project knowledge management in Logica. We describe the related theories and our approach, the ‘circle of knowledge’. According to our analysis it results in the data-based import or update process between two specialized applications, one for project...... management and one for knowledge sharing. We describe the applications involved and the features used. The main component here is a templating mechanism in the KiWi system....

  18. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  19. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  20. Growth and project finance in the least developed countries

    OpenAIRE

    Lisbeth F. la Cour; Jennifer Müller

    2014-01-01

    This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of ...

  1. A Coastal Citizen Science Project - How to run an international Citizen Science Project?

    Science.gov (United States)

    Kruse, K.; Knickmeier, K.; Thiel, M.; Gatta, M.

    2016-02-01

    "Searching for plastic garbage" is an international Citizen Science project that aims to participate school students in the public discussion on the topic "plastic pollution in the ocean". For this, young people apply various research methods, evaluate their data, communicate and publish their results and investigate solutions solving this problem. The project will be carried out in Chile and Germany at the same time, which allows the participating students to share and compare their results and discuss their ideas with an international partner. This takes place on the website www.save-ocean.org. The project promotes intercultural and scientific skills of the students. They get insights into scientific research, get into another culture and experiences plastic pollution as an important global problem. Since May 2015, 450 pupils aged 10 to 15 years and 20 teachers in Germany and Chile have explored the plastic garbage on beaches. Where are the largest plastic garbage deposits? Which items of plastic are mostly found in Germany and Chile? Or where does this garbage comes from? These and other research questions are being answered by an international network between students, teachers and scientists. After completing the first Citizen Science pilot study successfully in summer 2015, the entire German and Chilean coast will be explored in spring 2016 by around 2500 participating school students. The project "Searching for plastic garbage" is the first international Citizen Science project that is a cooperation between the ocean:lab of Kiel Science Factory and the "Cientificos de la Basura", a project of the department of marine biology at University Catolica del Norte in Coquimbo, Chile. The project is supported by the Cluster of Excellence "The Future Ocean", the Leibniz Institute for Science Education and Mathematics (IPN), the Ministry of School and Professional Education of Land Schleswig-Holstein and the University Catolica del Norte in Coquimbo, Chile

  2. Managing trade-offs in landscape restoration and revegetation projects.

    Science.gov (United States)

    Maron, Martine; Cockfield, Geoff

    2008-12-01

    Landscape restoration projects often have multiple and disparate conservation, resource enhancement, and sometimes economic objectives, since projects that seek to meet more than one objective tend to be viewed more positively by funding agencies and the community. The degree to which there are trade-offs among desired objectives is an important variable for decision makers, yet this is rarely explicitly considered. In particular, the existence of ecological thresholds has important implications for decision-making at both the project level and the regional level. We develop a model of the possibilities and choices for an agency seeking to achieve two environmental objectives in a region through revegetation of a number of sites. A graphical model of the production possibilities sets for a single revegetation project is developed, and different trade-off relationships are discussed and illustrated. Then the model is used to demonstrate the possibilities for managing all such projects within a region. We show that, where there are thresholds in the trade-off relationship between two objectives, specialization (single- or dominant-objective projects) should be considered. This is illustrated using a case study in which revegetation is used to meet avian biodiversity and salinity mitigation objectives. We conclude that where there are sufficient scientific data, explicit consideration of different types of trade-offs can assist in making decisions about the most efficient mix and type of projects to better achieve a range of objectives within a region.

  3. Improving Sustainability Performance for Public-Private-Partnership (PPP Projects

    Directory of Open Access Journals (Sweden)

    Liyin Shen

    2016-03-01

    Full Text Available Improving sustainability performance in developing infrastructure projects is an important strategy for pursuing the mission of sustainable development. In recent years, the business model of public-private-partnership (PPP is promoted as an effective approach in developing infrastructure projects. It is considered that the distribution of the contribution on project investment between private and public sectors is one of the key variables affecting sustainability performance of PPP-type projects. This paper examines the impacts of the contribution distribution between public and private sectors on project sustainability performance. A model named the sustainability performance-based evaluation model (SPbEM is developed for assisting the assessment of the level of sustainability performance of PPP projects. The study examines the possibility of achieving better sustainability through proper arrangement of the investment distribution between the two primary sectors in developing PPP-type infrastructure projects.

  4. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  5. Oil sands tailings management project

    Energy Technology Data Exchange (ETDEWEB)

    Godwalt, C. [Alberta WaterSMART, Calgary, AB (Canada); Kotecha, P. [Suncor Energy Inc, Calgary, AB (Canada); Aumann, C. [Alberta Innovates - Technology Futures, Alberta Governement, AB (Canada)

    2010-11-15

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  6. Oil sands tailings management project

    International Nuclear Information System (INIS)

    Godwalt, C.; Kotecha, P.; Aumann, C.

    2010-11-01

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  7. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  8. Learning analytics approach of EMMA project

    NARCIS (Netherlands)

    Tammets, Kairit; Brouns, Francis

    2014-01-01

    The EMMA project provides a MOOC platform to aggregate and delivers massive open online courses (MOOC) in multiple languages from a variety of European universities. Learning analytics play an important role in MOOCs to support the individual needs of the learner.

  9. Renal artery origins: best angiographic projection angles.

    Science.gov (United States)

    Verschuyl, E J; Kaatee, R; Beek, F J; Patel, N H; Fontaine, A B; Daly, C P; Coldwell, D M; Bush, W H; Mali, W P

    1997-10-01

    To determine the best projection angles for imaging the renal artery origins in profile. A mathematical model of the anatomy at the renal artery origins in the transverse plane was used to analyze the amount of aortic lumen that projects over the renal artery origins at various projection angles. Computed tomographic (CT) angiographic data about the location of 400 renal artery origins in 200 patients were statistically analyzed. In patients with an abdominal aortic diameter no larger than 3.0 cm, approximately 0.5 mm of the proximal part of the renal artery and origin may be hidden from view if there is a projection error of +/-10 degrees from the ideal image. A combination of anteroposterior and 20 degrees and 40 degrees left anterior oblique projections resulted in a 92% yield of images that adequately profiled the renal artery origins. Right anterior oblique projections resulted in the least useful images. An error in projection angle of +/-10 degrees is acceptable for angiographic imaging of the renal artery origins. Patients sex, site of interest (left or right artery), and local diameter of the abdominal aorta are important factors to consider.

  10. Understanding Engagement in Dementia Through Behavior. The Ethographic and Laban-Inspired Coding System of Engagement (ELICSE and the Evidence-Based Model of Engagement-Related Behavior (EMODEB

    Directory of Open Access Journals (Sweden)

    Giulia Perugia

    2018-05-01

    Full Text Available Engagement in activities is of crucial importance for people with dementia. State of the art assessment techniques rely exclusively on behavior observation to measure engagement in dementia. These techniques are either too general to grasp how engagement is naturally expressed through behavior or too complex to be traced back to an overall engagement state. We carried out a longitudinal study to develop a coding system of engagement-related behavior that could tackle these issues and to create an evidence-based model of engagement to make meaning of such a coding system. Fourteen elderlies with mild to moderate dementia took part in the study. They were involved in two activities: a game-based cognitive stimulation and a robot-based free play. The coding system was developed with a mixed approach: ethographic and Laban-inspired. First, we developed two ethograms to describe the behavior of participants in the two activities in detail. Then, we used Laban Movement Analysis (LMA to identify a common structure to the behaviors in the two ethograms and unify them in a unique coding system. The inter-rater reliability (IRR of the coding system proved to be excellent for cognitive games (kappa = 0.78 and very good for robot play (kappa = 0.74. From the scoring of the videos, we developed an evidence-based model of engagement. This was based on the most frequent patterns of body part organization (i.e., the way body parts are connected in movement observed during activities. Each pattern was given a meaning in terms of engagement by making reference to the literature. The model was tested using structural equation modeling (SEM. It achieved an excellent goodness of fit and all the hypothesized relations between variables were significant. We called the coding system that we developed the Ethographic and Laban-Inspired Coding System of Engagement (ELICSE and the model the Evidence-based Model of Engagement-related Behavior (EMODEB. To the best of our

  11. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  12. Policy and planning for large infrastructure projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2005-01-01

    This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation ...... for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important.......This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation...... the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning...

  13. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  14. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  15. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  16. Integrating System Dynamic and Fuzzy Logic for Economic Assessment of BOT Projects

    Directory of Open Access Journals (Sweden)

    Farnad Nasirzadeh

    2016-03-01

    Full Text Available The selection of the most appropriate project for the investment is one of the most important decisions that should be made by the private investors. This problem is of vital importance in BOT projects, where the total investment as well as the investor's profit should be recovered by the project's income. There are several approaches proposed by the researchers to determine the best economical project in comparison to other projects. The previous researches, however, faced with some major defects. As an example, the effects of various factors affecting the project evaluation process as well as the existing risks and uncertainties are not taken into account. In this research, economic assessment of BOT projects is performed by integrating system dynamic simulation approach and fuzzy logic. For this purpose, first the project's NPV is modeled considering all the influencing factors qualitatively. The relationships that exist between different factors are then determined and the quantitative model is built. Using the developed model, the value of NPV is simulated considering the effects of all the influencing factors and the existing uncertainties. Finally, the value of project's NPV is determined as a triangular fuzzy number. Finally, the best alternative project is selected by comparing the simulated values of NPV. To evaluate the capabilities and performance of the proposed model, the project economical evaluation is performed for two highway projects and the best project is selected.

  17. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  18. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  19. Performance of consultants on government projects in ghana: Client and contractor pespective

    Directory of Open Access Journals (Sweden)

    J. Dadzie

    2013-07-01

    Full Text Available Construction project consultants share the characteristics of helping their clients address problems and improve upon project performance; they have a passion for the wisdom and expertise they bring to the project, and they have the ability to galvanize clients into action. However, it is an open secret that many projects often delay. Also, it is a known fact that most project contract figures swell more than double the original tender figure. Meanwhile, there are supervising consultants who are engaged and paid to manage such important projects. Their role however, is to complement the effort of contractors to ensure a successful completion of a project. The aim of this research is to identify factors affecting the performance of consultants on government projects, and to rank these factors according to their relative importance from the perspective of consultants. Analysis of the factors considered in a survey indicate that the main factors negatively affecting the performance of consultants are: urgency of the project at hand, project duration, variations, political influence from higher authority, timely decision making on the part of the consulting team and the experience of the design team on the project. The others are the ability of the consultants to work as a team, creativity on the part of the consultants in controlling cost and developing own efficiencies so that contract sums are kept within budget .

  20. Measuring efficiency of university-industry Ph.D. projects using best worst method

    NARCIS (Netherlands)

    Salimi, N.; Rezaei, J.

    2016-01-01

    A collaborative Ph.D. project, carried out by a doctoral candidate, is a type of collaboration between university and industry. Due to the importance of such projects, researchers have considered different ways to evaluate the success, with a focus on the outputs of these projects. However, what

  1. Benchmarking and validation activities within JEFF project

    OpenAIRE

    Cabellos O.; Alvarez-Velarde F.; Angelone M.; Diez C.J.; Dyrda J.; Fiorito L.; Fischer U.; Fleming M.; Haeck W.; Hill I.; Ichou R.; Kim D. H.; Klix A.; Kodeli I.; Leconte P.

    2017-01-01

    The challenge for any nuclear data evaluation project is to periodically release a revised, fully consistent and complete library, with all needed data and covariances, and ensure that it is robust and reliable for a variety of applications. Within an evaluation effort, benchmarking activities play an important role in validating proposed libraries. The Joint Evaluated Fission and Fusion (JEFF) Project aims to provide such a nuclear data library, and thus, requires a coherent and efficient be...

  2. Perspectives of joint implementation projects in Lithuania

    OpenAIRE

    Štreimikienė, Dalia; Mikalauskienė, Asta

    2004-01-01

    The paper deals with the perspectives of joint implementation (JI) projects in Lithuania. The analysis of flexible mechanisms under the Kyoto protocol including Jl benefits is presented in the paper. The main aim of the article is to analyze current macroeconomic environment which has impact on the JI perspectives in Lithuania and based on this analysis to define activities, measures and institutions necessary for the implementation of these projects. A very important issue in this context is...

  3. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  4. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  5. The Peru Project

    International Nuclear Information System (INIS)

    Radicella, Renato

    1998-01-01

    The first important nuclear technology transfer performed by the National Atomic Energy Commission was the construction of a nuclear research center for the Peruvian Nuclear Energy Institute. The center is, even today, the most complete nuclear complex built in another country by Argentina, and it remains a prime example of a major transfer of nuclear technology, goods and services by a developing country to another developing country. The experimental reactor at the Peruvian center is the most powerful reactor in operation in Latin America and, together with its production laboratories, it is the most important facility for radioisotope and radiopharmaceuticals production in the region. The center has also laboratories for the Peruvian radiation protection system. The main characteristics of the project are described

  6. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  7. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  8. Conception of personal career as a self-realization project

    OpenAIRE

    Tarasova, Julija

    2017-01-01

    SUMMARY Conception of personal career as a self-realization project. Bachelor work. Relevance: Nowadays career is an important aspect in an individual’s life where the main author of the script, the director and creator is the person who takes responsibility for his/her own life. Modern career management is a life long process, which is more like a self monitored project based on self realisation. A successful career in project management is not only about an individual’s personal qualities, ...

  9. Myoglobin structure and function: A multiweek biochemistry laboratory project.

    Science.gov (United States)

    Silverstein, Todd P; Kirk, Sarah R; Meyer, Scott C; Holman, Karen L McFarlane

    2015-01-01

    We have developed a multiweek laboratory project in which students isolate myoglobin and characterize its structure, function, and redox state. The important laboratory techniques covered in this project include size-exclusion chromatography, electrophoresis, spectrophotometric titration, and FTIR spectroscopy. Regarding protein structure, students work with computer modeling and visualization of myoglobin and its homologues, after which they spectroscopically characterize its thermal denaturation. Students also study protein function (ligand binding equilibrium) and are instructed on topics in data analysis (calibration curves, nonlinear vs. linear regression). This upper division biochemistry laboratory project is a challenging and rewarding one that not only exposes students to a wide variety of important biochemical laboratory techniques but also ties those techniques together to work with a single readily available and easily characterized protein, myoglobin. © 2015 International Union of Biochemistry and Molecular Biology.

  10. Financing innovative technologies in wind projects

    International Nuclear Information System (INIS)

    Vaughan, C.

    2006-01-01

    Methods of market entry and the financing of new technologies were discussed from the perspective of Clipper Windpower, a wind energy company based in the northeastern United States and Canada. Many new technology companies only consider private equity when seeking financing for new product development. However, financing for projects and products is only the first step to market entry. Wind projects are the financial equivalent of a high yield bond with mechanical risk. Many wind power projects with company equity can also be seen as a long term bond with upside in any given year. It is therefore important for wind developers to seek out strategic buyers for both product development and project development, in addition to finding sources of private equity. Clipper Windpower Inc. has developed a partnership with British Petroleum (BP), who hold an equity interest in the company. Both companies are now partnering on projects with Clipper turbines, and firm orders are in place for 2007 and 2008. As a result of the partnership, Clipper now has increased its financial strength in cash flows, balance sheets, and projected revenue. It was concluded that a successful partnership can increase the scale of wind power development, and bring financial sophistication to smaller companies with limited resources. refs., tabs., figs

  11. CERN's Large Hadron Collider project

    Science.gov (United States)

    Fearnley, Tom A.

    1997-03-01

    The paper gives a brief overview of CERN's Large Hadron Collider (LHC) project. After an outline of the physics motivation, we describe the LHC machine, interaction rates, experimental challenges, and some important physics channels to be studied. Finally we discuss the four experiments planned at the LHC: ATLAS, CMS, ALICE and LHC-B.

  12. CERN's Large Hadron Collider project

    International Nuclear Information System (INIS)

    Fearnley, Tom A.

    1997-01-01

    The paper gives a brief overview of CERN's Large Hadron Collider (LHC) project. After an outline of the physics motivation, we describe the LHC machine, interaction rates, experimental challenges, and some important physics channels to be studied. Finally we discuss the four experiments planned at the LHC: ATLAS, CMS, ALICE and LHC-B

  13. Stakeholder preferences towards the sustainable development of CDM projects: Lessons from biomass (rice husk) CDM project in Thailand

    International Nuclear Information System (INIS)

    Parnphumeesup, Piya; Kerr, Sandy A.

    2011-01-01

    This research applies both quantitative and qualitative methods to investigate stakeholder preferences towards sustainable development (SD) priorities in Clean Development Mechanism (CDM) projects. The CDM's contribution to SD is explored in the context of a biomass (rice husk) case study conducted in Thailand. Quantitative analysis ranks increasing the usage of renewable energy as the highest priority, followed by employment and technology transfer. Air pollution (dust) is ranked as the most important problem. Preference weights expressed by experts and local resident are statistically different in the cases of: employment generation; emission reductions; dust; waste disposal; and noise. Qualitative results, suggest that rice husk CDM projects contribute significantly to SD in terms of employment generation, an increase in usage of renewable energy, and transfer of knowledge. However, rice husk biomass projects create a potential negative impact on air quality. In order to ensure the environmental sustainability of CDM projects, stakeholders suggest that Thailand should cancel an Environmental Impact Assessment (EIA) exemption for CDM projects with an installed capacity below 10 MW and apply it to all CDM projects. - Highlights: → Stakeholders rank increasing the usage of renewable energy as the highest priority. → Biomass (rice husk) CDM projects create a potential negative impact on air quality. → Rice husk CDM projects cannot give an extra income to farmers. → Preference weights expressed by experts and local residents are statistically different.

  14. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  15. To Continue or Discontinue the Project, That is the Question

    NARCIS (Netherlands)

    Arviansyah, A.; Spil, Antonius A.M.; van Hillegersberg, Jos

    2015-01-01

    Information systems and technology (IS/IT) projects are perceived as ventures that are prone to failure. An evaluation as part of IS/IT governance and control is highly important for stakeholders, to lessen the risk and the failure of such projects. However, decision-makers often encounter

  16. The JET PCU project: An international plasma control project

    International Nuclear Information System (INIS)

    Sartori, F.; Crisanti, F.; Albanese, R.; Ambrosino, G.; Toigo, V.; Hay, J.; Lomas, P.; Rimini, F.; Shaw, S.R.; Luchetta, A.; Sousa, J.; Portone, A.; Bonicelli, T.; Ariola, M.; Artaserse, G.; Bigi, M.; Card, P.; Cavinato, M.; De Tommasi, G.; Gaio, E.

    2008-01-01

    This paper describes the new JET enhancement project 'Plasma Control Upgrade' (PCU). Initially aimed at an overhaul of JET plasma control capabilities it was eventually focused on improving the vertical stabilisation (VS) system ability to recover from large ELM (edge localised mode) perturbations. The paper describes the results of the first two years where the activity was aimed principally at researching a solution that could be implemented within the timing and budget constraints. A very important task was that of improving the modelling of JET plasma, iron core and passive structures. Using dedicated experiments, the models were progressively refined until it was possible not just to explain the experimental data but predict the VS system behaviour. At the same time the project team studied the best options for power supply (PS) and control system upgrades and evaluated whether a change of turns in the stabilisation coil was desirable and possible. A new fast radial field power supply is now being ordered and the VS control system is being upgraded

  17. Project-based production and project management: Findings and trends in research on temporary systems in multiple contexts

    Directory of Open Access Journals (Sweden)

    Tinus Pretorius

    2014-02-01

    Full Text Available Globalisation is challenging almost every aspect of the political, economic, social and technological environment. Organisations, whether public or private, have to adapt their strategies and operations to stay competitive and efficient. Historically, organisations adopted project-based operations as a mode to stay competitive, although the applications tended to be the oneoff type of operations such as construction and system development projects (Edum-Fotwe & McCaffer, 2000. As the world changed from an industrially driven to a more knowledge driven economy and the pace of continuous change became more intense, organisations adopted a project-based mode of operations on a broader scale. The knowledge economy lead to the creation of many service orientated industries. Organisations started facing portfolios of projects where the nature of these projects differed in technological complexity, urgency, customer value and social impact (Gutjahr & Froeschl, 2013. Based on their experience with more technically orientated projects, organisations focused their attention more intensely on new project management methods, tools and processes and not necessarily on the human and organisational interfaces. This paradigm changed however, especially since the 1980s and more and more organisations adopted temporary organisational forms (Bakker, 2010 in order to improve their competitiveness. The contributions in this special edition of the South African Journal of Economic and Management Sciences have a common focus on the importance of the human and organisational interface of project-based operations on project success. The purpose of this concluding article is to analyse the findings and recommendations in these papers and to detect trends and future research opportunities in the field of project-based operations.

  18. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  19. Continuous Briefing and User Participation in Building Projects

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    and the methods for user participation, identifies problem areas and point out possible improvements. The author has been actively involved in the project as deputy project director with re-sponsibility for the briefing process until spring 2005 and is now a researcher.......Briefing is not just about specifying needs as requirements but also about evaluating how well design pro-posals fulfill the needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the pre-project stage to create a basis for the project decision...... into the building is required. A building project is often part of a change process of the organisation that is going to occupy the building, and this change process should be management carefully to reach a successful result. An important aspect of briefing is to manage the par-ticipation of the coming users...

  20. Current issues in nuclear power projects decision making

    International Nuclear Information System (INIS)

    Yanev, Y.; Rogner, H.

    2011-01-01

    Concluding Comments: Firm government commitment and support - imminent; New financing approaches/models are emerging, repackaging existing methods and combination of project finance/co-operative mode; Global financial crisis will make financing for investors very challenging, especially for large scale infrastructure projects like NNP –financial regulators to impose tougher rules (Basel III, UK bank levy, US Financial Regulatory Bill, etc; Pure project finance is still challenging for nuclear projects - the availability of finance for new NPPs will depend on the initial government support. This presentation presents a “free market” view on investment in nuclear power projects; If the public sector (governments) wishes to invest in nuclear power as part of its socioeconomic development priorities, finance is not a real obstacle; It becomes an issue in the presence of other equally important development needs and private sector participation is sought

  1. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  2. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  3. China's meat and grain imports during 2000–2012 and beyond

    DEFF Research Database (Denmark)

    Yu, Wusheng; Cao, Lijuan

    2015-01-01

    projected shifts in consumption patterns driven by rapid per capita income growth. Several plausible explanations of this paradoxical trade pattern are offered, including mass imports of feed grains, persistent (but shrinking) gaps between Chinese and international meat prices, tariff barriers, and non-tariff...

  4. Privatisation electric power sector in Pakistan: some important issues

    International Nuclear Information System (INIS)

    Ghafoor, A.; Weiss, J.

    1998-01-01

    This discussion paper highlights important issues relating to the privatisation of Pakistan's electric power sector. Salient features of the electric power sector in Pakistan, factors affecting the economic performance of this sector, the partial privatisation policy adopted by Pakistan, ongoing private power projects, and current privatisation policy are examined. The arguments for competition are raised, and alternative policy reforms the are considered

  5. Considerations for successful minority investments in independent power projects

    International Nuclear Information System (INIS)

    Bleveans, Lincoln

    1998-01-01

    This article considers the role of lead developers and lead investors, and minority investors in power projects. The risks involved in minority investment without control is examined, and minority investor issues, the 'due diligence' of the minority investor, the need for timely information, and the importance of minority investors to the power project are discussed. (UK)

  6. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  7. Uncertainties in the Dutch Reference Projections. Background information for the report 'Reference Projections Energy and Emissions 2005-2020'

    International Nuclear Information System (INIS)

    Seebregts, A.J.; Gijsen, A.

    2005-09-01

    The Dutch targets for greenhouse gases, ammonia and non-methane VOCs will likely be met in 2010 according to our calculations from an uncertainty analysis in the framework of the project on Reference Projections for energy, climate and acidifying emissions. However, it is unlikely that the targets for sulphur dioxide and nitrogen oxide will be attained This study distinguished between sources of uncertainty in the input variables of the Reference Projections. These sources were quantified with the help of the 'Guidance for Uncertainty Assessment and Communication' and 'expert judgement'. With the aid of a statistical Monte Carlo analysis, margins and probability distributions were determined for the most important outcomes of the Reference Projections. These probability distributions led, for example, to several statements being made on the chances of meeting certain targets. The use of 'Guidance for Uncertainty Assessment and Communication' was also evaluated [nl

  8. Identification of coordination factors affecting building projects performance

    Directory of Open Access Journals (Sweden)

    Wesam Salah Alaloul

    2016-09-01

    Full Text Available Construction projects performance requires improvement to fulfil the complexity of the stakeholders’ needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII such as Scheduling (RII = 0.97, Quality assurance plan (RII = 0.93, and all parties’ participation in plans (RII = 0.89. These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance.

  9. The Nabucco Project and Communicating about Energy Security

    Directory of Open Access Journals (Sweden)

    Victor Negrescu

    2013-07-01

    Full Text Available Energy Security was considered by many of the Eastern European countries a priority in their fight for breaking the ties with the former Soviet Union. The dependence of the Eastern European countries to the Russian gas and petroleum generated for most of the local governments a feeling of inferiority that they were willing to replace if the opportunity will be offered. One of the main alternative projects to the Russian gas is the Nabucco Project designed to enable the access to Caspian gas for all the European countries. Knowing that a decision on the realization of the pipeline should be made by the end of June 2013, our article will try to illustrate the importance of the Nabucco Project for the regional and European energy security by studying the history of the project, the competing projects and the recent political evolutions of the project. This will enable researchers, decision makers and policy makers in the energy sector to better evaluate the Nabucco project and better act into promoting it.

  10. Utilizing a scale model solar system project to visualize important planetary science concepts and develop technology and spatial reasoning skills

    Science.gov (United States)

    Kortenkamp, Stephen J.; Brock, Laci

    2016-10-01

    Scale model solar systems have been used for centuries to help educate young students and the public about the vastness of space and the relative sizes of objects. We have adapted the classic scale model solar system activity into a student-driven project for an undergraduate general education astronomy course at the University of Arizona. Students are challenged to construct and use their three dimensional models to demonstrate an understanding of numerous concepts in planetary science, including: 1) planetary obliquities, eccentricities, inclinations; 2) phases and eclipses; 3) planetary transits; 4) asteroid sizes, numbers, and distributions; 5) giant planet satellite and ring systems; 6) the Pluto system and Kuiper belt; 7) the extent of space travel by humans and robotic spacecraft; 8) the diversity of extrasolar planetary systems. Secondary objectives of the project allow students to develop better spatial reasoning skills and gain familiarity with technology such as Excel formulas, smart-phone photography, and audio/video editing.During our presentation we will distribute a formal description of the project and discuss our expectations of the students as well as present selected highlights from preliminary submissions.

  11. The Risks of Investments in Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2002-01-01

    Full Text Available Investment decisions should not be taken without an in-depth analysis of the risks. This is an important stage in project preparation and should be performed simultaneously with the planning of the financial operations. Infrastructure development requires that project risks and responsibilities be assigned to the public or private entity that is best able to manage them. The risks and their financial impacts are usually not quantified equally by all parties. Each party views the given risks according to the guarantees provided. These guarantees are related to the form of participation in the project.

  12. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  13. Evolution of project planning tools in a matrix organization

    Energy Technology Data Exchange (ETDEWEB)

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  14. The Darfur Atrocities Documentation Project

    Science.gov (United States)

    Totten, Samuel

    2004-01-01

    One of the many important aspects of the Darfur Atrocities Documentation Project was that it set a precedent for what the U.S. and/or other nations can, and should do, when future cases of potential genocide arise. Far too often in the recent past, the international community (the United Nations, individual governments, many nongovernmental…

  15. Strategic Management of Large Projects

    Institute of Scientific and Technical Information of China (English)

    WangYingluo; LiuYi; LiYuan

    2004-01-01

    The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.

  16. APPROACHES FOR EVALUATING AND FINANCING INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    MARIA-LOREDANA POPESCU

    2011-04-01

    Full Text Available This article presents the financial investment approach and the investment evaluation methods, which are criteria for assessing both investment projects and their funding sources. An important role in the analysis carried out is played by the investment decision and financing decision quality. Making an investment decision implies computing the related investment efficiency indicators. They allow the comparison of several variants of the same investment project as well as their comparison with other projects in the same industry or in other industries. The financing decision concerns the selection between their own sources (share capital, depreciation fund, profits, reserve funds, additional capital, revenues from investments, attracted sources (domestic resource mobilization and borrowed sources (credits.

  17. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  18. Evaluation of Sustainable Practices within Project Management Methods

    Directory of Open Access Journals (Sweden)

    Shah Satya

    2017-01-01

    Full Text Available The purpose of this research study is to investigate some of the sustainable practices within projects with a focus on social projects. The different research methodologies applied through this research consisted both primary and secondary research, including literature review and through case study. The stakeholder’s behavioural needs towards acting and implementing sustainable practices led to the adoption of sustainable practices within projects which are managed across profit and non-profit organisations. Nevertheless, lack of sustainable behaviour was outlined, and henceforth the integration of sustainable development within social projects is crucially important as such projects were identified as the drivers toward educating the society in order to help to produce generations of people who would be more sustainably aware. Currently, sustainable development is very often taken into account when it comes to managing projects. Nevertheless, if the adoption of sustainable practices is well established in some sectors such as construction, literature tends to demonstrate a lack of information regarding other sectors, especially within social projects. This research aims to investigate the adoption of sustainable practices within social projects and therefore to satisfy a literature gap.

  19. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  20. How do ICT project managers manage project knowledge in the public sector? An empirical enquiry from the Victorian Public Sector in Australia

    Directory of Open Access Journals (Sweden)

    Yakub Karagoz

    2016-10-01

    Full Text Available Projects are temporal organisation forms that are highly knowledge-intensive and play an important role in modern public (and private sector organisations. The effective and efficient creation, dissemination, application and conservation of relevant knowledge are a critical success factor in the management of projects. Yet, project management (PM and knowledge management (KM are two distinct disciplines. This paper explores the relationship between PM and KM by analysing the literature at the intersection of those disciplines and presenting the empirical results of a case study of the Victorian Public Sector (VPS in Australia. A series of 14 interviews were conducted to explore how ICT project managers manage project knowledge across the departments of the VPS. Findings show a strong preference among the participants for informal, face-to-face interactions and agile approaches to facilitate knowledge transfer and creation in ICT project environments.

  1. Behavioral Pattern of Endemic Sri Lanka Grey Hornbill (Ocyceros gingalensis within the Breeding and Nonbreeding Seasons

    Directory of Open Access Journals (Sweden)

    Iresha Wijerathne

    2018-01-01

    Full Text Available The hornbills are among the most extraordinary looking birds in the world. Out of two species of hornbill, the Ocyceros gingalensis is the only endemic grey hornbill in Sri Lanka. This study was conducted in Mihintale Sanctuary which is comprised of secondary dry mixed evergreen forest patches and semiurbanized area from 2013 to 2015. Ad libitum focal animal sampling was used to construct an ethogram for the behavior of Sri Lanka grey hornbill (SLGh. The study recorded 35 behavioral events in 11 acts under 4 types of their activities. Courtship and mating activities were recorded within the study period. Food items were changed throughout the parental care period. Within this period chicks were offered sufficient food comprised of fruits and flesh. These revealed that the nesting of the SLGh in suburb areas is not good sign since it potentially indicates the loss of adequate breeding conditions in the forest. Conservation of SLGh depends on protection of trees and tree cavities as an important ecological niche.

  2. The High Luminosity LHC Project

    Science.gov (United States)

    Rossi, Lucio

    The High Luminosity LHC is one of the major scientific project of the next decade. It aims at increasing the luminosity reach of LHC by a factor five for peak luminosity and a factor ten in integrated luminosity. The project, now fully approved and funded, will be finished in ten years and will prolong the life of LHC until 2035-2040. It implies deep modifications of the LHC for about 1.2 km around the high luminosity insertions of ATLAS and CMS and relies on new cutting edge technologies. We are developing new advanced superconducting magnets capable of reaching 12 T field; superconducting RF crab cavities capable to rotate the beams with great accuracy; 100 kA and hundred meter long superconducting links for removing the power converter out of the tunnel; new collimator concepts, etc... Beside the important physics goals, the High Luminosity LHC project is an ideal test bed for new technologies for the next hadron collider for the post-LHC era.

  3. An Na+/H+ antiporter gene from wheat plays an important role

    Indian Academy of Sciences (India)

    PRAKASH KUMAR

    might play an important role in salt and osmotic stress tolerance in plant cells. [Yu J N, Huang J, ..... of TaNHX2 might be related to salt tolerance in wheat. TaNHX2 might also ... This work was supported by National Basic Research Project.

  4. The CEDAR Project

    CERN Document Server

    Butterworth, J M; Waugh, B M; Stirling, W J; Whalley, M R

    2005-01-01

    We describe the plans and objectives of the CEDAR project (Combined e-Science Data Analysis Resource for High Energy Physics) newly funded by the PPARC e-Science programme in the UK. CEDAR will combine the strengths of the well established and widely used HEPDATA database of HEP data and the innovative JetWeb data/Monte Carlo comparison facility, built on the HZTOOL package, and will exploit developing grid technology. The current status and future plans of both of these individual sub-projects within the CEDAR framework are described, showing how they will cohesively provide (a) an extensive archive of Reaction Data, (b) validation and tuning of Monte Carlo programs against these reaction data sets, and (c) a validated code repository for a wide range of HEP code such as parton distribution functions and other calculation codes used by particle physicists. Once established it is envisaged CEDAR will become an important Grid tool used by LHC experimentalists in their analyses and may well serve as a model in ...

  5. The Tree of Life Project

    Science.gov (United States)

    Milbrath, Sherry

    2009-01-01

    Middle-school students are just beginning to recognize their place in the world. That is why this author believes it is important to incorporate their world into their art. In this article, the author discusses the "Tree of Life" project, which she developed for her students in order to make them aware of various environmental issues, and how to…

  6. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  7. Overview of the ACEX project iodine work

    International Nuclear Information System (INIS)

    Merilo, M.

    1996-01-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. The results of this work are expected to identify where additional data

  8. The GPS Laser Retroreflector Array Project

    Science.gov (United States)

    Merkowitz, Stephen M.

    2012-01-01

    Systematic co-location in space through the precision orbit determination of GPS satellites via satellite laser ranging will contribute significantly towards improving the accuracy and stability of the international terrestrial reference frame. NASA recently formed the GPS Laser Retroreflector Array Project to develop and deliver retroreflectors for integration on the next generation of GPS satellites. These retroreflectors will be an important contributor to achieving a global accuracy of 1.0 mm and 0.1 mm/year stability in the international terrestrial reference frame. We report here the current status of the GPS Laser Retroreflector Array Project.

  9. The importance of hot drought in providing more useful, and higher confidence, projections of future climatic, hydrologic, and ecosystem impacts.

    Science.gov (United States)

    Overpeck, J. T.; Udall, B. H.

    2017-12-01

    Often cited as a general guide to future climatic change, "the wet get wetter, and the dry get drier" is a misleading way to look towards the future for many regions of the globe, just as the simple use of multi-model ensemble projections of temperature and precipitation change averaged over many years can also be quite misleading for real-world planning and decision-making. Factors that support these assertions are multi-fold. First, we know with high confidence that warming will continue as long as greenhouse gas emissions continue. Second, continued warming will act to make droughts more frequent, longer and more severe in many regions. Even in the absence of precipitation declines, increases in evaporation and evapotranspiration, among other things, will drive regional drying. It is misleading to suggest to decision-makers that although the future may see an increase in drought risk, a projected increase in mean precipitation will counter-balance the increased drought risk. This counter-balancing will be absent during periods of precipitation-dominated drought. Moreover, projections of precipitation change are usually associated with much less confidence than projections of warming. For example, in places like the headwaters of the Colorado and Rio Grande Rivers, or East Africa, many models suggest we should be seeing an increase in precipitation, when in fact we are only seeing significant warming. Moreover, paleoclimatic evidence suggests that state-of-the-art Earth System Models may underestimate the risk of future multi-decadal droughts, even though these droughts have occurred in many regions during the last 2000 years. This reality suggests that even in regions that do see modest increases in mean precipitation, there will likely be periods in the future characterized by decades of below 20th century mean precipitation coupled with unprecedented warmth. Hot drought may be a much more widespread and serious threat than widely recognized.

  10. Economic analysis of radioactive waste storage and disposal projects

    International Nuclear Information System (INIS)

    Kleinen, P.J.; Starnes, R.B.

    1995-01-01

    Radioactive waste storage and disposal efforts present challenging issues for cost and economic analyses. In particular, legal requirements for states and compact areas to develop radioactive waste disposal sites, combined with closure of some sites, have placed urgency on planning, locating, and constructing storage and disposal sites. Cost analyses of potential projects are important to the decision processes. Principal objectives for cost analyses for projects are to identify all activities, covering the entire project life cycle, and to develop costs for those activities using methods that allow direct comparisons between competing project alternatives. For radioactive waste projects, long project lives ranging from tens of years to 100 or more years must be considered. Alternative, and competing, technologies, designs, and operating plans must be evaluated. Thorough base cost estimates must be made for all project phases: planning, development, licensing/permitting, construction, operations, and maintenance, closure, and post-closure/institutional care. Economic analysis procedures need to accommodate the specific features of each project alternative and facilitate cost comparisons between differing alternatives. Economic analysis assumptions must be developed to address the unusually long project lives involved in radioactive waste projects

  11. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  12. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  13. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  14. RF Phase Reference Distribution System for the TESLA Technology Based Projects

    CERN Document Server

    Czuba, K; Romaniuk, R S

    2013-01-01

    Since many decades physicists have been building particle accelerators and usually new projects became more advanced, more complicated and larger than predecessors. The importance and complexity of the phase reference distribution systems used in these accelerators have grown significantly during recent years. Amongst the most advanced of currently developed accelerators are projects based on the TESLA technology. These projects require synchronization of many RF devices with accuracy reaching femtosecond levels over kilometre distances. Design of a phase reference distribution system fulfilling such requirements is a challenging scientific task. There are many interdisciplinary problems which must be solved during the system design. Many, usually negligible issues, may became very important in such system. Furthermore, the design of a distribution system on a scale required for the TESLA technology based projects is a new challenge and there is almost no literature sufficiently covering this subject. This th...

  15. Evaluating financial education initiatives in South Africa: The importance of multiple evaluation approaches

    Directory of Open Access Journals (Sweden)

    Emily Massey

    2016-06-01

    Objectives: This study aims to show that, particularly in a South African context, where investment in financial education interventions is mandated by the Financial Sector Codes, impact should not be the only criterion assessed when evaluating financial education projects. Research method and design: This study was informed by a literature review, a synthesis of team experience on a range of financial education projects in South Africa and the development of case studies. Results: Describing the success or failure of a project needs to go beyond impact and explore factors such as project relevance, design and quality. In order to verify these other factors, different types of evaluations are necessary at the various stages of the project’s life-cycle. Conclusion: Expanding the learning objective beyond the exclusive identification of whether financial behaviour was achieved is particularly important where financial education projects, and the monitoring and evaluation thereof, is mandated. In the African context, where resources are scarce, money for monitoring and evaluation should be selectively channelled into determining project relevance, effectiveness, efficiency and then only impact.

  16. Incentive Structure of Financing a Project: An Islamic Finance Approach

    OpenAIRE

    Lone, Fayaz Ahmad; Quadir, Abdul

    2017-01-01

    Financing is an important component in any project. Without finance, it is impossible to run any project as it is considered the lifeblood of the business. But due to the presence of predetermined rate of interest, economists have provided alternative approach for financing the project. In this paper a model using Profit and Loss Sharing (PLS) system and comparison of it with the conventional financing model is developed. Thrust in this paper is towards establishing a new theoretical reasonin...

  17. Freedom and Responsibility in Synthetic Genomics: The Synthetic Yeast Project

    OpenAIRE

    Sliva, Anna; Yang, Huanming; Boeke, Jef D.; Mathews, Debra J. H.

    2015-01-01

    First introduced in 2011, the Synthetic Yeast Genome (Sc2.0) Project is a large international synthetic genomics project that will culminate in the first eukaryotic cell (Saccharomyces cerevisiae) with a fully synthetic genome. With collaborators from across the globe and from a range of institutions spanning from do-it-yourself biology (DIYbio) to commercial enterprises, it is important that all scientists working on this project are cognizant of the ethical and policy issues associated with...

  18. Valuing of research project in energy field with real options

    International Nuclear Information System (INIS)

    De Blasio, N.; Marzo, G.; Turatto, R.

    2008-01-01

    This article presents an application of real options theory for valuing a research project in the field of stranded gas valorisation. After a presentation of the theory, the analysis addresses the use of real options evaluation for generating alternative pathways in order to add new value to the R D projects. It also shows how real option approach may be important for selecting among competitive projects, but also for providing a system for valorisation of decision-maker flexibility [it

  19. Linking project-based production and project management temporary systems in multiple contexts: An introduction to the special edition

    Directory of Open Access Journals (Sweden)

    Leon AG Oerlemans

    2014-02-01

    Full Text Available As organisations in more and more industries look for flexible ways of production in the wake of rapidly changing market environments, project-based organising is becoming an increasingly important mode of organisation (Eisenhardt & Tabrizi, 1995. Whereas project-based organisation was traditionally mainly the domain of industries such as film making (Sorenson & Waguespack, 2006, theatre (Goodman & Goodman, 1976, and construction (Gann & Salter, 2000, a project-based mode of operation has recently pervaded many other sectors in the economy, including software development, advertising, biotechnology, consulting, emergency response, fashion, television and complex products and systems (Grabher, 2004; Hobday, 2000. This increasing prevalence is reflected in an exponentially growing body of research (Bakker, 2010, which has made marked progress in areas such as project-based learning (Prencipe & Tell, 2001, project-based innovation (Eisenhardt & Tabrizi, 1995 and project-based careers (Jones, 1996. As a consequence, research on project organisation has moved from being a narrow specialty domain toward being a broad research paradigm, attending to a broad audience in organisation science and beyond (Sydow et al., 2004. In a fairly recent review paper, Bakker (2010 shows that in the period 1988–2008 scholarly attention, as indicated by publications in books and ISI-indexed journals, grew exponentially (see Figure 1. Comparing the number of publications in the period 1988-1998 with the period 1998–2008, he observed an increase of almost 340%.

  20. 2001 annual report for the Pend Oreille wetlands wildlife mitigation projects; ANNUAL

    International Nuclear Information System (INIS)

    Entz, Ray D.

    2001-01-01

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie

  1. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  2. Projective geometry for polarization in geometric quantization

    International Nuclear Information System (INIS)

    Campbell, P.; Dodson, C.T.J.

    1976-12-01

    It is important to know the extent to which the procedure of geometric quantization depends on a choice of polarization of the symplectic manifold that is the classical phase space. Published results have so far been restricted to real and transversal polarizations. Here we also consider these cases by presenting a formulation in terms of projective geometry. It turns out that there is a natural characterization of real transversal polarizations and maps among them using projective concepts. We give explicit constructions for Rsup(2n)

  3. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Bonnal, P. [CERN; Féral, B. [CERN; Kershaw, K. [CERN; Nicquevert, B. [CERN; Baudin, M. [Ecole Normale Superieure; Lari, L. [ESS, Lund; Le Cardinal, J. [Chatenay-Malabry, Ecole Centrale

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  4. Smart use of data, information and communication: the INFORM-ed Best Local Practice Project--Grafton Base Hospital.

    Science.gov (United States)

    Lloyd, Sheree; Collie, Jean; McInnes, Alastair; King, Kevin; Lollback, Alison; Garland, Angie

    This paper describes current progress for an information management project in a medium-sized rural hospital after the first four months of the one-year project. In particular, the article examines some of the project outcomes to date as these relate to the National Hospitals and Health Reform recommendations for the smart use of data, information and communication. The paper identifies a number of important challenges and issues that have been addressed by the project and proposes that the project findings may be used to inform similar projects in other settings. These findings relate to clinician requirements for reports, investment in human resources, development, and time for information management activities. An understanding of data collected, information systems, and presentation of clinician data are also important. The benefits of information sharing in assisting quality improvement activities are particularly relevant but, more importantly, they can engage and involve clinicians in the use of information. The importance of local data, information, and knowledge is described. Finally, issues for the health information management profession, such as working collegially and sharing knowledge and expertise, are outlined.

  5. Users and user study methodology: the JUBILEE project

    OpenAIRE

    Linda Banwell; Graham Coulson

    2004-01-01

    This paper presents both theoretical aspects and practical examples from the on-going and large-scale JUBILEE (JISC User Behaviour in Information seeking: Longitudinal Evaluation of Electronic information services) project, now in its fifth year. Particular emphasis will be placed on the importance of using robust theory and methods as the basis for reputable user studies, especially those undertaken by practitioners. Theory underlying the development of the JUBILEE project and Toolkit is out...

  6. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  7. ECO INVESTMENT PROJECT MANAGEMENT THROUGH TIME APPLYING ARTIFICIAL NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenović

    2007-06-01

    Full Text Available he concept of project management expresses an indispensable approach to investment projects. Time is often the most important factor in these projects. The artificial neural network is the paradigm of data processing, which is inspired by the one used by the biological brain, and it is used in numerous, different fields, among which is the project management. This research is oriented to application of artificial neural networks in managing time of investment project. The artificial neural networks are used to define the optimistic, the most probable and the pessimistic time in PERT method. The program package Matlab: Neural Network Toolbox is used in data simulation. The feed-forward back propagation network is chosen.

  8. Studies in the Philippines on ingestion and organ content of trace elements of importance to radiological protection. Reference Asian man project (phase 2)

    International Nuclear Information System (INIS)

    Natera, E.S.

    2000-01-01

    The first Coordinated Research Program (CRP) on Reference Asian Man was conducted for a period of six years. This study dealt with the collection of data in four areas namely, anthropometric measurements, organ mass measurements, nutritional and dietary intake, pulmonary and water balance studies. Results of this study participated by eight Asian member states including the Philippines are contained in the IAEA TECDOC-1005. Based on research needs with reference to radiation protection, dietary intake and tissue analysis appears to be important aspects of the RAM. Hence, the first CRM for Phase 2 held in Manila July 1-4, 1996 strengthened the need to continue the project. Protocols on its implementation were discussed during this meeting. The Philippines presented a report that described the sampling and analytical methods that will be applied. This report aim to present the initial samples collected as well as the data generated from these samples. Elements of interest to radiation protection include Sr, Th, U, 1, Cs and trace elements present in food, water and in selected tissues such as liver, lung, kidney, thyroid and bone

  9. Watershed Watch: The Importance of Mentors in Student-driven Full Inquiry Undergraduate Research Projects as the Foundation for an Introductory Course in Biogeoscience

    Science.gov (United States)

    Rock, B. N.; Hale, S. R.; Graham, K. J.; Hayden, L.; Barber, L.; Perry, C.; Schloss, J.; Sullivan, E.; Yuan, J.; Abebe, E.; Mitchell, L.; Abrams, E.; Gagnon, M.

    2008-12-01

    Watershed Watch (NSF 0525433) engages early undergraduate students from two-year and four-year colleges in student-driven full inquiry-based instruction in the biogeosciences. Program goals for Watershed Watch are to test if inquiry-rich student-driven projects sufficiently engage undeclared students (or noncommittal STEM majors) to declare a STEM major (or remain with their STEM major). A significant component of this program is an intensive two-week Summer course, in which undeclared freshmen research various aspects of a local watershed. Students develop their own research questions and study design, collect and analyze data, and produce a scientific or an oral poster presentation. The course objectives, curriculum and schedule are presented as a model for dissemination for other institutions and programs seeking to develop inquiry-rich courses designed to attract students into biogeoscience disciplines. Data from self-reported student feedback indicated the most important factors explaining high-levels of student motivation and research excellence in the course are 1) working with committed, energetic, and enthusiastic faculty mentors; and 2) faculty mentors demonstrating high degrees of teamwork and coordination.

  10. Site characterization activities at Stripa and other Swedish projects

    International Nuclear Information System (INIS)

    Ahlstroehm, P.E.

    1991-01-01

    The Swedish research programme concerning spent nuclear fuel disposal aims for submitting a siting license application around the year 2000. An important step towards that goal will be the detailed characterization of at least two potential sites in late 1990s. In preparation for such characterization several research projects are conducted. One is the international Stripa Project that includes a site characterization and validation project for a small size granite rock body. The Stripa work also includes further development of instrumentation and measurement techniques. Another project is the Finnsjoen Fracture Zone Project, which is characterizing a subhorizontal zone at depths from 100 to 350 meters. The third project is the new Swedish Hard Rock Laboratory planned at the site of the Oskarshamn nuclear power plant. The preinvestigations and construction of this laboratory include major efforts in development, application and validation of site characterization methodology. (author) 6 figs., 9 refs

  11. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  12. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  13. The project of installing a ZIMPOL_3 polarimeter at GREGOR in Tenerife

    OpenAIRE

    Michele Bianda; Renzo Ramelli; Jan Olof Stenflo; Svetlana Berdyugina; Daniel Gisler; Ivan Defilippis; Nazaret Bello Gonzáles

    2013-01-01

    A project of collaboration between Kiepenheuer Institut für Sonnenphysik KIS and Istituto Ricerche Solari Locarno IRSOL includes the installation of a ZIMPOL_3 high resolution polarimeter at the 1.5 meter aperture solar telescope GREGOR in Tenerife. Important scientific topics are expected to be investigated in particular in the case of events showing faint amplitude polarization signatures like scattering polarization effects and the Hanle effect. This project has also a technical importance...

  14. A critical evaluation of the STRATEGY project

    DEFF Research Database (Denmark)

    Howard, B.J.; Liland, A.; Beresford, N.A.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management...... of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried...... out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated....

  15. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B. J.; Liland, A.; Beresford, N. A.; Andersson, K. G.; Cox, G.; Gil, J. M.; Hunt, J.; Nisbet, A.; Oughton, D. H.; Voigt, G.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated. (authors)

  16. Understanding Project Based Production through Socio-technical Modularity

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff

    This paper develops an approach for understanding Project Based Production. This form of production is characterized by unique deliverables, high complexity, high value, high risk, profound uncertainty and many stakeholders and is increasingly important the postmodern society. Common to the pract......This paper develops an approach for understanding Project Based Production. This form of production is characterized by unique deliverables, high complexity, high value, high risk, profound uncertainty and many stakeholders and is increasingly important the postmodern society. Common...... to the practices of PBP and other production practices is the goal of balancing the dilemma between creativity and productivity. In response to industrialized production, the concept of modularity gained popularity for addressing this dilemma by exploring product, process and organization structures. However...... with the starting point in system theory and a strong bias towards industrial production, the predominant understanding of modularity faces difficulty in explaining practices of Project Based Production in both social – technical and dynamic – stable aspects. Illustrated by a case the paper addresses this gap...

  17. Theory of affine projection algorithms for adaptive filtering

    CERN Document Server

    Ozeki, Kazuhiko

    2016-01-01

    This book focuses on theoretical aspects of the affine projection algorithm (APA) for adaptive filtering. The APA is a natural generalization of the classical, normalized least-mean-squares (NLMS) algorithm. The book first explains how the APA evolved from the NLMS algorithm, where an affine projection view is emphasized. By looking at those adaptation algorithms from such a geometrical point of view, we can find many of the important properties of the APA, e.g., the improvement of the convergence rate over the NLMS algorithm especially for correlated input signals. After the birth of the APA in the mid-1980s, similar algorithms were put forward by other researchers independently from different perspectives. This book shows that they are variants of the APA, forming a family of APAs. Then it surveys research on the convergence behavior of the APA, where statistical analyses play important roles. It also reviews developments of techniques to reduce the computational complexity of the APA, which are important f...

  18. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  19. Critical thinking of classical view of project management

    Institute of Scientific and Technical Information of China (English)

    祁亮

    2015-01-01

    Synopsis:This essay argues that the classic view has to be updated to meet the new demands. It is found out that the scientific manage-ment believes that there are a few essential roles of managers,including planning,organizing,leading,and controlling. There are many impor-tant aspects which lead to the complexity of the modern project management such as globalization and technology. There are many things that are not compatible between the current projects and the traditional theory. It is also considerable to realize that sometimes scholars disagree with each other about the prevalence of complicated projects. However,even if the classic project management theory is useful in certain cases, there is no doubt that such theory demands significant improvements to better suit the current world. Therefore,it is significant that the classic project management theory be upgraded. In order to improve the performances of the project management,it is recommended that stakeholder theory is promoted,decentralized decision making is allowed,and adoption of new technology is recommended.

  20. Electricity generation projections of the world and Brazil

    International Nuclear Information System (INIS)

    Dias, Marcio Soares

    2002-01-01

    The world use of electricity is projected to increase by 9,570 billions kWh over a span of 20 years. Natural gas is expected to account for the largest increment in electricity generation. As a result of high oil and natural gas consumption fuel prices are projected to rise in nominal dollars over the forecast horizon. Higher capacity utilisation and fewer expected retirements of running nuclear plants have resulted in a revision of EIA's projected consumption of electricity from nuclear power. Projection of 3.6%/year in the electricity consumption in Brazil is lower than the historical correlation given by the GDP (5%) growth rate plus 1.2 to 1.7%. GDP and energy consumption growth rates for Brazil are projected to be higher than the world value, but are lower than the projected values for countries like Mexico and China. Trends in primary fuel prices and external dependence on fuel supply are important factors for the Brazilian investments on electricity generation due their impact on costs and standard of living. (author)

  1. What drives continuous improvement project success in healthcare?

    Science.gov (United States)

    Stelson, Paul; Hille, Joshua; Eseonu, Chinweike; Doolen, Toni

    2017-02-13

    Purpose The purpose of this paper is to present findings from a study of factors that affect continuous improvement (CI) project success in hospitals. Design/methodology/approach Quantitative regression analysis was performed on Likert scale survey responses. Qualitative thematic analysis was performed on open-ended survey responses and written reports on CI projects. Findings The paper identifies managerial and employee factors that affect project success. These factors include managerial support, communication, and affective commitment. Affective commitment is the extent to which employees perceive the change as being needed or necessary. Practical implications The results highlight how managerial decisions, approaches to communication - including communication before, during and after CI projects affect project success. The results also show that success depends on the way employees perceive proposed changes. This suggests the need for a more individualized approach to CI, lean, and broader change initiatives. Originality/value This research is the first to fuse project success and sustainability theory to CI projects, beyond Kaizen events, in healthcare environments. The research is particularly important at a time when healthcare organizations are required to make rapid changes with limited resources as they work toward outcome-based assessment and reimbursement rules.

  2. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  3. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  4. The Three Gorges Project of China. An engineering project of the century, or megalomania?; Chinas ``Drei-Schluchten-Project``. Jahrhundertwerk oder Groessenwahn?

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, H.D.

    1998-03-01

    The Three Gorges Project on the Yangtse River is one of the biggest hydraulic engineering projects ever. Its objectives are threefold: Improve flood control for a region with a population of several millions of people, generate power of an order of magnitude comparable to the output of ten nuclear power plants, and improve the navigability of China`s most important waterway. Just as any other big, international hydraulic engineering project, this one, too, has raised a storm of protest from opponents. Primarily the re-settlement of 1.3 million of people and aspects of the structural stability of the dam and related hazards are issues of controversy. In the eyes of the author of this article, opponents in the western hemisphere are drawing a far too gloomy picture in their rejection of the project. (orig./CB) [Deutsch] Das `Drei-Schluchten-Projekt` am Jangtse ist eines der anspruchsvollsten Wasserbauvorhaben, die je in Angriff genommen wurden. Es soll drei Zwecke erfuellen: Verbesserten Hochwasserschutz fuer Millionen von Menschen, Stromerzeugung in der Groessenordnung von zehn Kernkraftwerken sowie Erleichterung der Schiffahrt auf Chinas wichtigster Wasserstrasse. Wie wohl jedes internationale Wasserbauprojekt hat auch dieses gewaltige Vorhaben Protest bei Gegnern weltweit hervorgerufen. Insbesondere die erforderliche Umsiedlung von 1,3 Millionen Menschen und die Frage der Staumauersicherheit werden heftigst kritisiert bzw. angezweifelt. Mit der Verteufelung des Projektes schiessen die Anti-Staudamm-Gruppen aus dem Westen aber weit uebers Ziel hinaus. (orig./RHM)

  5. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  6. The CARE project (Coordinated Accelerator Research in Europe)

    International Nuclear Information System (INIS)

    Napoly, Olivier

    2006-01-01

    CARE, an ambitious and coordinated project of accelerator research and developments oriented towards High Energy Physics projects, has been launched in January 2004 by the main European laboratories and the European Commission with the 6th Framework Programme. This project aims at improving existing infrastructures dedicated to future projects such as linear colliders, upgrades of hadron colliders and high intensity proton drivers An important part of this programme is devoted to advancing the performance of the superconducting technology, both in the fields of RF cavities for electron and proton acceleration and of high field magnets, as well as to developing high intensity electron and proton injectors. We describe the plans of the four main Joint Research Activities and report on the results and progress obtained so far. The CARE project also includes three adjacent Networking Activities whose main goal is to organize a forum of discussions and to provide the strategic plans in the fields of the Linear Collider, intense Neutrino Beams, and future Hadron Colliders

  7. Student Attitudes Towards and Impressions of Project Citizen

    Directory of Open Access Journals (Sweden)

    Sara Winstead FRY

    2013-05-01

    Full Text Available Project Citizen is a civic education curriculum used across the United States and internationally, yet research about its impact on students is lacking in the literature. This article reports the results of a preliminary study designed to answer the following questions: What are students’ attitudes toward and perceptions of Project Citizen? How do their attitudes and perceptions compare to those of students who completed senior projects? Tenhigh school students and 23 first-year college students completed a questionnaire designed for this study. Our findings indicate that the high school students had positive perceptions of Project Citizen, and they self-reported anunderstanding and high levels of efficacy regarding civic responsibility. In contrast, the first-year college students had lower levels of efficacy regarding civic responsibility. Our findings suggest the importance of specific learning experiences to help students develop civic knowledge, skills, and dispositions, and indicate the need for further research into civic programs such as Project Citizen

  8. Planning a change project in mental health nursing.

    Science.gov (United States)

    Thorpe, Rebecca

    2015-09-02

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  9. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Directory of Open Access Journals (Sweden)

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  10. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  11. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large

  12. Stripa Project - Summary of defined programs

    International Nuclear Information System (INIS)

    Carlsson, L.; Olsson, T.; Pusch, R.

    1980-11-01

    An international cooperation project, the Stripa Project, in the field of nuclear waste management has been established as an autonomous OECH/NEA project. The management of the project has been entrusted to the Divsion Nuclear Fuel Safety (KBS) of the Swedish Nuclear Fuel Supply Company (SKBF). Technical input and contribution of funds are given by the following countries: Canada, Finland, Japan, Sweden, Switzerland and the United States. The report summarizes the programs for investigations funded at this stage. A number of investigations of a geophysical, geochemical and hydraulic nature will be carried out in the boreholes and the drill cores will be mapped and analysed. Another experiment is with various tracers which represent all important types of radionuclides and will be introduced in the naturally flowing water in a single fissure in granite. The experiment will show how well sorption data from the laboratory can be used to predict radionuclide migration in the field with real surfaces and waters. The third project aims at the verification of the suitability of the buffer materials at real conditions on site. Highly compacted bentonite and mixtures of bentonite and quartz sand are proposed as buffer materials in final repositories for high-level radioactive wastes. (GB)

  13. The role of the Industrial Bank of Japan in financing gas projects

    International Nuclear Information System (INIS)

    Kajiwara, Yasushi

    1991-01-01

    This paper concerns liquefied natural gas projects, or LNG projects for short, and more specifically, how the Industrial Bank of Japan, IBJ, as a private bank has been involved in many projects, and how the bank has solved a range of problems encountered in the process of financing such projects. After that, the author's personal views are expressed on how to tackle the future development of LNG, an energy source that will become increasingly important in the future

  14. Human factors and technology environment in multinational project: problems and solutions

    International Nuclear Information System (INIS)

    Jardi Besa, X.; Munoz Cervantes, A.

    2012-01-01

    At the onset of nuclear projects in Spain, there was an import of nuclear technology. In a second phase, there was a transfer of technology. Subsequently, there was an adaptation of the technology. In this evolution, comparable to that of other countries, were involved several countries, overcoming the difficulties of human factors involved. The current nuclear projects multinationals have a new difficulty: the different industrial technological environments. This paper will address the organizational challenges of multinational engineering projects, in the type of project and the human factors of the participating companies.

  15. The Importance of Experience Based Decommissioning Planning

    International Nuclear Information System (INIS)

    Larsson, Arne; Lidar, Per; Hedin, Gunnar; Bergh, Niklas

    2016-01-01

    Decommissioning of a nuclear facility is an extensive and multidisciplinary task, which involves the management and technical actions associated with ceasing operation and thereafter the step-by-step transfer of the facility from an operating plant to an object under decommissioning. The decommissioning phase includes dismantling of systems and components, decontamination and clearance, demolition of buildings, remediation of any contaminated ground and finally a survey of the site. Several of these activities generate radioactive or potentially radioactive waste, which has to be managed properly prior to clearance or disposal. What makes decommissioning of nuclear installations unique is to large extent the radioactive waste management. No other industries have that complex regulatory framework for the waste management. If decommissioning project in the nuclear industry does not consider the waste aspects to the extent required, there is a large risk of failure causing a reduced trust by the regulators and other stakeholders as well as cost and schedule overruns. This paper will give an overview of important aspects and findings gathered during decades of planning and conducting decommissioning and nuclear facility modernization projects. (authors)

  16. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  17. CORONA - project overview

    International Nuclear Information System (INIS)

    Pironkov, L.

    2012-01-01

    The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. In this regard, the implementation of ECVET ( E uropean Credit system for Vocational Education and Training ) in the sectors of nuclear fission and radiation protection is particularly important in all education and training actions under Euratom. International Nuclear Conference “Bulgarian

  18. The HESP (High Energy Solar Physics) project

    Science.gov (United States)

    Kai, K.

    1986-01-01

    A project for space observations of solar flares for the coming solar maximum phase is briefly described. The main objective is to make a comprehensive study of high energy phenomena of flares through simultaneous imagings in both hard and soft X-rays. The project will be performed with collaboration from US scientists. The HESP (High Energy Solar Physics) WG of ISAS (Institute of Space and Astronautical Sciences) has extensively discussed future aspects of space observations of high energy phenomena of solar flares based on successful results of the Hinotori mission, and proposed a comprehensive research program for the next solar maximum, called the HESP (SOLAR-A) project. The objective of the HESP project is to make a comprehensive study of both high energy phenomena of flares and quiet structures including pre-flare states, which have been left uncovered by SMM and Hinotori. For such a study simultaneous imagings with better resolutions in space and time in a wide range of energy will be extremely important.

  19. An overview of turbomachinery project in Malaysian oil and gas industry

    Science.gov (United States)

    Abd. Rahman Sabri, Harris; Rahim, Abd. Rahman Abdul; Yew, Wong Kuan; Ismail, Syuhaida

    2017-12-01

    Being the most demanding, challenging and exciting engineering and technological advances has provided escalated interests amongst the engineers at large to venture into the oil and gas (O&G) industry. Although claimed as the most expensive industry in the world via the utilisation of critical equipments, the O&G industry is still recording notorius failures in its project management especially due to turbomachinery issues, the heart equipment of any O&G project. Therefore, it is important for this paper to review turbomachinery project as one of the long lead items during project executions that is also proven to be the most costly and expensive equipment. This paper therefore discusses the gaps in turbomachinery studies via literature review in highlighting its application in O&G projects. It is found that the main components of turbomachinery are driver and driven equipment, which are applied for mechanical equipment, Electric Power Generation and heat generation for Combined Cycled Configuration. Important variables for turbomachinery selection include: (1) process requirement; (2) site location; (3) driver selection; (4) equipment sparing philosophy; (5) efficiency and reliability; (6) operability and maintainability; and (7) cost. It is hoped that this paper would lead to the successful project management of turbomachinery in the O&G industry.

  20. Internationalization Measures in Large Scale Research Projects

    Science.gov (United States)

    Soeding, Emanuel; Smith, Nancy

    2017-04-01

    Internationalization measures in Large Scale Research Projects Large scale research projects (LSRP) often serve as flagships used by universities or research institutions to demonstrate their performance and capability to stakeholders and other interested parties. As the global competition among universities for the recruitment of the brightest brains has increased, effective internationalization measures have become hot topics for universities and LSRP alike. Nevertheless, most projects and universities are challenged with little experience on how to conduct these measures and make internationalization an cost efficient and useful activity. Furthermore, those undertakings permanently have to be justified with the Project PIs as important, valuable tools to improve the capacity of the project and the research location. There are a variety of measures, suited to support universities in international recruitment. These include e.g. institutional partnerships, research marketing, a welcome culture, support for science mobility and an effective alumni strategy. These activities, although often conducted by different university entities, are interlocked and can be very powerful measures if interfaced in an effective way. On this poster we display a number of internationalization measures for various target groups, identify interfaces between project management, university administration, researchers and international partners to work together, exchange information and improve processes in order to be able to recruit, support and keep the brightest heads to your project.