WorldWideScience

Sample records for project environment safety

  1. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  2. Aviation Safety Program Atmospheric Environment Safety Technologies (AEST) Project

    Science.gov (United States)

    Colantonio, Ron

    2011-01-01

    Engine Icing: Characterization and Simulation Capability: Develop knowledge bases, analysis methods, and simulation tools needed to address the problem of engine icing; in particular, ice-crystal icing Airframe Icing Simulation and Engineering Tool Capability: Develop and demonstrate 3-D capability to simulate and model airframe ice accretion and related aerodynamic performance degradation for current and future aircraft configurations in an expanded icing environment that includes freezing drizzle/rain Atmospheric Hazard Sensing and Mitigation Technology Capability: Improve and expand remote sensing and mitigation of hazardous atmospheric environments and phenomena

  3. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  4. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  5. Project CHERISH (Children in Home Environments: Regulation To Improve Safety and Health). Final Report.

    Science.gov (United States)

    Grubb, Paul Dallas

    In 1990, Project CHERISH (Children in Home Environments: Regulation to Increase Safety and Health) enabled the Texas Department of Human Services to implement and evaluate several innovative strategies to strengthen regulation of family day care homes. This report contains descriptions of those strategies, an evaluation of their efficacy, and…

  6. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    Science.gov (United States)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  7. Analysis of Aviation Safety Reporting System Incident Data Associated with the Technical Challenges of the Atmospheric Environment Safety Technology Project

    Science.gov (United States)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This study analyzed aircraft incidents in the NASA Aviation Safety Reporting System (ASRS) that apply to two of the three technical challenges (TCs) in NASA's Aviation Safety Program's Atmospheric Environment Safety Technology Project. The aircraft incidents are related to airframe icing and atmospheric hazards TCs. The study reviewed incidents that listed their primary problem as weather or environment-nonweather between 1994 and 2011 for aircraft defined by Federal Aviation Regulations (FAR) Parts 121, 135, and 91. The study investigated the phases of flight, a variety of anomalies, flight conditions, and incidents by FAR part, along with other categories. The first part of the analysis focused on airframe-icing-related incidents and found 275 incidents out of 3526 weather-related incidents over the 18-yr period. The second portion of the study focused on atmospheric hazards and found 4647 incidents over the same time period. Atmospheric hazards-related incidents included a range of conditions from clear air turbulence and wake vortex, to controlled flight toward terrain, ground encounters, and incursions.

  8. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES ampersand H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES ampersand H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES ampersand H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES ampersand H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES ampersand H issues

  9. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES&H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES&H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES&H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES&H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES&H issues.

  10. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  11. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  12. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  13. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  14. Environment, safety and health

    International Nuclear Information System (INIS)

    Luzianovich, L.Ch.; Fardeau, J.C.; Darras, M.

    2000-01-01

    Environment, safety and health were the three topics discussed by the WOC 8 working group of the worldwide gas congress. Environment protection has become a major preoccupation and constraint for natural gas industry at the dawn of the new millennium. It is closely linked with the safety of installation and with the health of workmen who exploit or use natural gas energy: methane emissions, health and safety in gas industry, environment management and evaluation. (J.S.)

  15. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  16. Environment, safety, health, and quality plan for the TRU- Contaminated Arid Soils Project of the Landfill Stabilization Focus Area Program

    International Nuclear Information System (INIS)

    Watson, L.R.

    1995-06-01

    The Landfill Stabilization Focus Area (LSFA) is a program funded by the US Department of Energy Office of Technology Development. LSFA supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The TRU-Contaminated Arid Soils project is being conducted under the auspices of the LSFA Program. This document describes the Environment, Safety, Health, and Quality requirements for conducting LSFA/Arid Soils activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to LSFA/Arid Soils operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and system and performance audits as they apply to the LSFA Program

  17. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  18. Project Nuclear Safety

    International Nuclear Information System (INIS)

    1981-11-01

    The semiannual progress report 1981/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1981 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics, work performed, results obtained, plans for future work. This report was compiled by the project management. (orig.) [de

  19. Nuclear safety project

    International Nuclear Information System (INIS)

    1984-11-01

    The semiannual progress report 1984/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1984 in the nuclear safety field by KfK institutes and departements and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./RW) [de

  20. Responsible Management for Health, Safety and Environment (HSE) in Uranium Mining & Mineral Processing Projects

    International Nuclear Information System (INIS)

    Saint-Pierre, Sylvain

    2014-01-01

    If management is adequate for conventional HSE risk, the bulk of the job should be taken care of Good practices are already well known for the remaining risk, including radiation safety Radiation should be addressed in a proportionate manner as part of overall HSE management. However, public expectations are probably the highest for radiation, wastes, discharges, etc.

  1. Nuclear Safety Project

    International Nuclear Information System (INIS)

    1983-12-01

    The semiannual progress report 1983/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1983 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. (orig./RW) [de

  2. Nuclear safety project

    International Nuclear Information System (INIS)

    Anon.

    1980-11-01

    The 17th semi-annual report 1980/1 is a description of work within the Nuclear Safety Project performed in the first six months of 1980 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics - work performed, results obtained, plans for future work. (orig.) [de

  3. Nuclear Safety Project

    International Nuclear Information System (INIS)

    1978-11-01

    The 13th semi-annual report 1/78 is a description of work within the Nuclear Safety Project performed in the first six months of 1978 in the nuclear safety field by KFK institutes and departments and by external institutions on behalf of KfK. It includes for each individual research activity short summaries on - work completed, - essential results, - plans for the near future. (orig./RW) [de

  4. Safety and environment

    International Nuclear Information System (INIS)

    Cogne, F.

    1975-01-01

    The author analyses the papers presented by C. Starr and M. Muntzing at the Paris Conference on the maturity of nuclear energy. The main problems raised in the matter of safety (safety of the plants, plutonium toxicity, the possibilities of theft or sabotage, treatment and storage of the waste) are analyzed and it is pointed out that the hazards arising from the use of nuclear power are contained within reasonable limits. The experts should take the initiative of informing the general public on these matters as the mass media circulate too much inaccurate information in this field. As concerns the environment, it is the choice of sites and the harmonizing of the rules and procedures which appear to be the most important problems for the authorities charged with safety measures [fr

  5. Environment and safety research status report: 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The 1993 status report discusses ongoing and planned research activities in the GRI Environment and Safety Program. The objectives and goals, accomplishments, and strategy along with the basis for each project area are presented for the supply, end use, and gas operations subprograms. Within the context of these subprograms, contract status summaries under their conceptual titles are given for the following project areas: Gas Supply Environmental and Safety Research, Air Quality Research, End Use Equipment Safety Research, Gas Operations Safety Research, Liquefied Natural Gas, Safety Research, and Gas Operations Environmental Research

  6. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  7. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  8. Surveys of research projects concerning nuclear facility safety, financed by the Federal Ministry for the Environment, Nature Protection and Reactor Safety, 1988

    International Nuclear Information System (INIS)

    1989-11-01

    Each progress report is a collection of individual reports, categorized by subject matter. They are a documentation of the contractor's progress, rendered by themselves on standardized forms, published, for the sake of general information on progress made in investigations concerning reactor safety, by the project attendance department of the GRS. The individual reports have serial numbers. Each report includes particulars of the objective, work carried out, results obtained and plans for project continuation. (orig.) [de

  9. Surveys of research projects concerning nuclear facility safety, financed by the Federal Ministry for the Environment, Nature Protection and Reactor Safety, 1987

    International Nuclear Information System (INIS)

    1988-06-01

    Each progress report is a collection of individual reports, categorized by subject matter. They are a documentation of the contractor's progress, rendered by themselves on standardized forms, published, for the sake of general information on progress made in investigations concerning reactor safety, by the project attendance department of the GRS. The individual reports have serial numbers. Each report includes particulars of the objective, work carried out, results obtained and plans for project continuation. (orig.) [de

  10. Surveys of research projects concerning nuclear facility safety financed by the Federal Ministry for the Environment, Nature Protection and Reactor Safety, 1991

    International Nuclear Information System (INIS)

    1992-09-01

    Each progress report is a collection of individual reports, categorized by subject matter. They are a documentation of the contractor's progress, rendered by themselves on standardized forms, published, for the sake of general information on progress made in investigations concerning reactor safety, by the project attendance department of the GRS. The individual reports have serial numbers. Each report includes particulars of the objective, work carried out, results obtained and plans for project continuation. (orig.) [de

  11. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  12. Environment, Safety & Health at SLAC

    Science.gov (United States)

    and safety of our staff, the community, and the environment as we carry out our scientific mission. We integral to each job. As stewards of our land, SLAC also seeks to minimize pollution to our environment and to protect our resources and biota. See the SLAC Environment, Safety and Health Policy for more

  13. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  14. Environment, Health, and Safety - Construction Subcontractors Documents |

    Science.gov (United States)

    NREL Environment, Health, and Safety - Construction Subcontractors Documents Environment Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and with these requirements before submitting proposals and/or environment, health and safety plans for the

  15. Sandia Laboratories environment and safety programs

    International Nuclear Information System (INIS)

    Zak, B.D.; McGrath, P.E.; Trauth, C.A. Jr.

    1975-01-01

    Sandia, one of ERDA's largest laboratories, is primarily known for its extensive work in the nuclear weapons field. In recent years, however, Sandia's role has expanded to embrace sizeable programs in the energy, resource recovery, and the environment and safety fields. In this latter area, Sandia has programs which address nuclear, fossil fuel, and general environment and safety issues. Here we survey ongoing activities and describe in more detail aa few projects of particular interest. These range from a study of the impact of sealed disposal of radioactive wastes, through reactor safety and fossil fuel plume chemistry, to investigations of the composition and dynamics of the stratosphere

  16. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  17. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  18. Health, safety and environment

    International Nuclear Information System (INIS)

    1977-01-01

    This part is concerned with the overall evaluation of the radiological and environmental aspects. It attempts to analyse problems such as: Does the establishment of a large regional centre with co-located facilities for storage, reprocessing, fuel fabrication and waste management create unacceptable radiological and environmental problems. If such a centre can be safely designed and operated, what guidance could be given to Member States wishing to explore the potential of an RFCC. For such a venture, what are the key ingredients of an adequate programme for the protection of workers and the environment under normal and emergency conditions. The approach has been taken of keeping as many parameters as possible constant while making a comparison between a multinational fuel cycle centre and a smaller national fuel cycle centre. The following two options are considered: a) A national fuel cycle centre with a 100-600t/a reprocessing plant co-located with a 20-120t/a mixed oxide fuel fabrication plant. b) An RFCC with one or more 700-1500t/a reprocessing plants, a 125-300t/a mixed oxide fabrication plant and waste management facilities

  19. Health, Safety, and Environment Division

    Energy Technology Data Exchange (ETDEWEB)

    Wade, C [comp.

    1992-01-01

    The primary responsibility of the Health, Safety, and Environmental (HSE) Division at the Los Alamos National Laboratory is to provide comprehensive occupational health and safety programs, waste processing, and environmental protection. These activities are designed to protect the worker, the public, and the environment. Meeting these responsibilities requires expertise in many disciplines, including radiation protection, industrial hygiene, safety, occupational medicine, environmental science and engineering, analytical chemistry, epidemiology, and waste management. New and challenging health, safety, and environmental problems occasionally arise from the diverse research and development work of the Laboratory, and research programs in HSE Division often stem from these applied needs. These programs continue but are also extended, as needed, to study specific problems for the Department of Energy. The results of these programs help develop better practices in occupational health and safety, radiation protection, and environmental science.

  20. Surveys of research projects concerning nuclear facility safety, financed by the Federal Ministry for the Environment, Nature Protection and Reactor Safety, 1989. (14. annual report on SR-projects)

    International Nuclear Information System (INIS)

    1990-11-01

    Each progress report is a collection of individual reports, categorized by subject matter. They are a documentation of the contractor's progress, rendered by themselves on standardized forms, published, for the sake of general information on progress made in investigations concerning reactor safety, by the project attendance department of the GRS. The individual reports have serial numbers. Each report includes particulars of the objective, work carried out, results obtained and plans for project continuation. (orig.) [de

  1. Health, safety and the environment

    International Nuclear Information System (INIS)

    1991-01-01

    The central theme of this 1990 Annual Report from British Nuclear Fuels Limited (BNFL) is that the health and safety of the public and protection of the environment are of primary concern. The report describes the fuel cycle for the production of radioactive materials used by the United Kingdom nuclear industry. Radiation protection measures undertaken by BNFL are explained as is their environmental research programme. Detailed attention is paid to the monitoring of effluent discharges into the environment and arrangements for radioactive waste disposal. The work of each BNFL site is described. The report finishes with a description of its occupational safety measures. (UK)

  2. Environment, Health, and Safety | NREL

    Science.gov (United States)

    -Wide Environmental Assessment 2014 (DOE/EA-1914). Final EA and FONSI Appendices. Natural and Cultural property, and the environment. View the Environmental Stewardship, Health, Safety, and Quality Management Environmental Assessment 2014. Final EA and FONSI Appendices. Download the National Wind Technology Center Site

  3. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  4. Environment, Safety, Health and Waste Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Feed Materials Production Center (FMPC) is the production of high qaulity uranium metal for use by the US Department of Energy (DOE) in Defense Programs. In order to accomplish this mission and to maintain the FMPC as a viable facility in the DOE production complex, the facility must be brought into full compliance with all federal and state regulations and industry standards for environmental protection and worker safety. Where past practices have resulted in environmental insult, a comprehensive program of remediation must be implemented. The purpose of this combined Environment, Safety, Health and Waste Management Plan is to provide a road map for achieving needed improvements. The plan is structured to provide a comprehensive projection from the current fiscal year (FY) through FY 1994 of the programs, projects and funding required to achieve compliance. To do this, the plan is subdivided into chapters which discuss the applicable regulations;project schedules and funding requirements;details of the various programs for environment, safety, health and waste management;details of the ongoing National Environmental Policy Act (NEPA);the quality assurance program and the environmental monitoring program. 14 refs., 30 figs., 29 tabs

  5. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  6. Safety Culture in New Build Projects

    International Nuclear Information System (INIS)

    Reiman, T.

    2016-01-01

    nuclear safety is not considered. It has to be constantly reminded that many of the decisions and actions made during the design and construction phases can have consequences years, if not decades, later. The promotion of nuclear safety culture must also take into account cultural and language differences often prevalent at the construction site. The presentation illustrates how the shared values, beliefs and assumptions about nuclear safety are influenced by four processes: Communication, safety leadership, climate, and interaction patterns. The shared values and the social processes in turn are embedded in and influenced by the organizational structures, organizational practices, tools and technology, as well as the individual employees. Aligning these different elements and developing them in unison in the complex project environment is challenging. The presentation gives some guidance on those challenges and proposes solutions to improve safety culture in pre-operational phases of nuclear power plants. (author)

  7. Environment, safety and health progress assessment manual

    International Nuclear Information System (INIS)

    1992-12-01

    On June 27, 1989, the Secretary of Energy announced a 1O-Point Initiative to strengthen environment,safety, and health (ES ampersand H) programs, and waste management activities at involved conducting DOE production, research, and testing facilities. One of the points independent Tiger Team Assessments of DOE operating facilities. The Office of Special Projects (OSP), EH-5, in the Office of the Assistant Secretary for Environment, Safety and Health, EH-1, was assigned the responsibility to conduct the Tiger Team Assessments. Through June 1992, a total of 35 Tiger Team Assessments were completed. The Secretary directed that Corrective Action Plans be developed and implemented to address the concerns identified by the Tiger Teams. In March 1991, the Secretary approved a plan for assessments that are ''more focused, concentrating on ES ampersand H management, ES ampersand H corrective actions, self-assessment programs, and root-cause related issues.'' In July 1991, the Secretary approved the initiation of ES ampersand H Progress Assessments, as a followup to the Tiger Team Assessments, and in the continuing effort to institutionalize the self-assessment process and line management accountability in the ES ampersand H areas. This volume contains appendices to the Environment, Safety and Health Progress Assessment Manual

  8. The TRAIN-project: railway safety and the train driver information environment and work situation. A summary of the main results

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, L. [MTO Psychology and Swedish National Rail Administration (Sweden); Ingre, M.; Kecklund, G.; Soederstroem, M.; Aakerstedt, T. [National Inst. for Psychosocial Factors and Health (Sweden); Lindberg, E. [Swedish National Rail Administration (Sweden); Jansson, A.; Olsson, E.; Sandblad, B. [Uppsala Univ. (Sweden). Dept. of Human-Computer Interaction; Almqvist, P. [Swedish State Railways (Sweden)

    2001-07-01

    The TRAIN project investigates traffic safety related risks, focusing in particular on the train driver work situation, use of information but also on the supporting safety organisation. It is an on-going project funded and managed by Swedish National Rail Administration and carried out by independent researchers. The project provides a multi-disciplinary investigation by use of a man-technology-organisation (MTO) perspective. Activities performed are task analysis, evaluation of the drivers use of information and interaction with the ATP system as well as analyses of stress, mental workload and work hours. Several methods are being used such as interviews, questionnaires, diaries, activity monitoring and videotapes. This paper gives an overview of the project as well as a short summary of the main results. Detailed results are presented in separate reports as started in the reference list. Some of the main results are that the drivers report severe problems concerning sleepiness on early morning shifts, problems with maintenance on vehicles, lack of information supporting the planning task as well as problems in understanding ATP functions. Two groups of drivers having a feed-back related as opposed to a feed-forward driving style could be identified. In conclusion there is a great need to perform more scientific studies of human factors and railway safety as well as to implement safety management programs including professional human factors competence in the railway industries. (orig.)

  9. Radiation safety for decommissioning projects

    International Nuclear Information System (INIS)

    Ross, A.C.

    1999-01-01

    Decommissioning of redundant nuclear facilities is a growth area in the UK at the present time. NUKEM Nuclear Limited is a leading-edge nuclear decommissioning and waste management contractor (with its own in-house health physics and safety department), working for a variety of clients throughout the UK nuclear industry. NUKEM Nuclear is part of the prestigious, international NUKEM group, a world-class organization specializing in nuclear engineering and utilities technologies. NUKEM Nuclear is involved in a number of large, complex decommissioning projects, both in its own right and as part of consortia. This paper explores the challenges presented by such projects and the interfaces of contractor, client and subcontractors from the point of view of a radiation protection adviser. (author)

  10. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  11. PERCEPTION OF BUILDING CONSTRUCTION WORKERS TOWARDS SAFETY, HEALTH AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    C.R. CHE HASSAN

    2007-12-01

    Full Text Available The construction industry is known as one of the most hazardous activities. Therefore, safety on the job site is an important aspect with respect to the overall safety in construction. This paper assesses the safety level perception of the construction building workers towards safety, health and environment on a construction job site in Kuala Lumpur, Malaysia. The above study was carried out by choosing 5 selected large building construction projects and 5 small building construction projects respectively in and around Kuala Lumpur area. In the present study, an exhaustive survey was carried out in these 10 project site areas using a standard checklist and a detailed developed questionnaire. The checklist comprised 17 divisions of safety measurements which are considered and perceived to be important from the safety point of view and was assessed based on the score obtained. The questionnaire comprised the general information with 36 safety attitude statements on a 1-5 Likert scale which was distributed to 100 construction workers. The results of the checklist show the difference of safety levels between the large and small projects. The study revealed that the large projects shown a high and consistent level in safety while the small projects shown a low and varied safety levels. The relationship between the factors can be obtained from the questionnaire. They are organizational commitment, factor influencing communication among workmates, worker related factors, personal role and supervisors’ role factors, obstacles to safety and safe behavior factors and management commitment at all levels in line with the management structure and risk taking behavioral factors. The findings of the present study revealed invaluable indications to the construction managers especially in improving the construction workers’ attitude towards safety, health and environment and hence good safety culture in the building construction industries.

  12. Advanced engineering environment collaboration project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-12-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

  13. Advanced engineering environment collaboration project

    International Nuclear Information System (INIS)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-01-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications

  14. Proceeding of Radiation Safety and Environment

    International Nuclear Information System (INIS)

    1996-01-01

    Scientific Presentation of Radiation Safety and Environment was held on 20-21 august 1996 at Center of Research Atomic Energy Pasar Jum'at, Jakarta, Indonesia. Have presented 50 papers about Radiation Safety, dosimetry and standardization, environment protection and radiation effect

  15. Environment, safety and health progress assessment manual

    International Nuclear Information System (INIS)

    1992-12-01

    On June 27, 1989, the Secretary of Energy announced a 10-Point Initiative to strengthen environment, safety, and health (ES ampersand H) programs, and waste management activities at DOE production, research, and testing facilities. One of the points involved conducting dent Tiger Team Assessments of DOE operating facilities. The Office of Special independent Projects (OSP), EH-5, in the Office of the Assistant Secretary for Environment, Safety and Health, EH-1, was assigned the responsibility to conduct the Tiger Team Assessments. Through June 1992, a total of 35 Tiger Team Assessments were completed. The Secretary directed that Corrective Action Plans be developed and implemented to address the concerns identified by the Tiger Teams. In March 1991, the Secretary approved a plan for assessments that are ''more focused, concentrating on ES ampersand H management, ES ampersand H corrective actions, self-assessment programs, and root-cause related issues.'' In July 1991, the Secretary approved the initiation of ES ampersand H Progress Assessments, as a followup to the Tiger Team Assessments, and in the continuing effort to institutionalize the self-assessment process and line management accountability in the ES ampersand H areas. This manual documents the processes to be used to perform the ES ampersand H Progress Assessments. It was developed based upon the lessons learned from Tiger Team Assessments, the two pilot Progress Assessments, and Progress Assessments that have been completed. The manual will be updated periodically to reflect lessons learned or changes in policy

  16. Advanced engineering environment pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty (Parametric Technology Corporation, Needham, MA)

    2006-10-01

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

  17. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    International Nuclear Information System (INIS)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment

  18. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  19. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  20. Monitoring product safety in the postmarketing environment.

    Science.gov (United States)

    Sharrar, Robert G; Dieck, Gretchen S

    2013-10-01

    The safety profile of a medicinal product may change in the postmarketing environment. Safety issues not identified in clinical development may be seen and need to be evaluated. Methods of evaluating spontaneous adverse experience reports and identifying new safety risks include a review of individual reports, a review of a frequency distribution of a list of the adverse experiences, the development and analysis of a case series, and various ways of examining the database for signals of disproportionality, which may suggest a possible association. Regulatory agencies monitor product safety through a variety of mechanisms including signal detection of the adverse experience safety reports in databases and by requiring and monitoring risk management plans, periodic safety update reports and postauthorization safety studies. The United States Food and Drug Administration is working with public, academic and private entities to develop methods for using large electronic databases to actively monitor product safety. Important identified risks will have to be evaluated through observational studies and registries.

  1. High temperature reactor safety and environment

    International Nuclear Information System (INIS)

    Brisbois, J.; Charles, J.

    1975-01-01

    High-temperature reactors are endowed with favorable safety and environmental factors resulting from inherent design, main-component safety margins, and conventional safety systems. The combination of such characteristics, along with high yields, prove in addition, that such reactors are plagued with few problems, can be installed near users, and broaden the recourse to specific power, therefore fitting well within a natural environment [fr

  2. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  3. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  4. Nordic projects concerning nuclear safety

    International Nuclear Information System (INIS)

    Soerensen, H.C.

    1988-11-01

    The report describes the nature of the work done in the first half of 1988 within the field of nuclear safety (1985-89) under the Nordic program for 1985-89. Five programmes and their documentation, are described and complete lists of addresses and of persons involved is given. (AB)

  5. Project safety studies - nuclear waste management (PSE)

    International Nuclear Information System (INIS)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  6. Environment, health and safety guiding principles

    International Nuclear Information System (INIS)

    1997-06-01

    The Canadian Energy Pipeline Association (CEPA) has taken a leadership role in promoting responsible planning, management and work practices that meet the pipeline industry's environment, health and safety objectives. This brochure contains CEPA's environment, health and safety statement. It lists the guiding principles developed and endorsed by CEPA and its member companies in support of protecting the environment and the health and safety of its employees and the public. The 11 CEPA member companies are: Alberta Natural Gas Company Ltd., ATCO Gas Services Ltd., Foothills Pipe Lines Ltd., Interprovincial Pipe Line Inc., NOVA Gas Transmission Limited, TransGas Limited, Trans Mountain Pipe Line Company Ltd., Trans-Northern Pipelines Inc., Trans Quebec and Maritimes Pipeline Inc., and Westcoast Energy Inc

  7. NASA's Aviation Safety and Modeling Project

    Science.gov (United States)

    Chidester, Thomas R.; Statler, Irving C.

    2006-01-01

    The Aviation Safety Monitoring and Modeling (ASMM) Project of NASA's Aviation Safety program is cultivating sources of data and developing automated computer hardware and software to facilitate efficient, comprehensive, and accurate analyses of the data collected from large, heterogeneous databases throughout the national aviation system. The ASMM addresses the need to provide means for increasing safety by enabling the identification and correcting of predisposing conditions that could lead to accidents or to incidents that pose aviation risks. A major component of the ASMM Project is the Aviation Performance Measuring System (APMS), which is developing the next generation of software tools for analyzing and interpreting flight data.

  8. Developing the health, safety and environment excellence instrument.

    Science.gov (United States)

    Mohammadfam, Iraj; Saraji, Gebraeil Nasl; Kianfar, Ali; Mahmoudi, Shahram

    2013-01-07

    Quality and efficiency are important issues in management systems. To increase quality, to reach best results, to move towards the continuous improvement of system and also to make the internal and external customers satisfied, it is necessary to consider the system performance measurement. In this study the Health, Safety and Environment Excellence Instrument was represented as a performance measurement tool for a wide range of health, safety and environment management systems. In this article the development of the instrument overall structure, its parts, and its test results in three organizations are presented. According to the results, the scores ranking was the managership organization, the manufacturing company and the powerhouse construction project, respectively. The results of the instrument test in three organizations show that, on the whole, the instrument has the ability to measure the performance of health, safety and environment management systems in a wide range of organizations.

  9. Transport fire safety engineering in the European Union - project TRANSFEU

    Directory of Open Access Journals (Sweden)

    Jolanta Maria RADZISZEWSKA-WOLIŃSKA

    2011-01-01

    Full Text Available Article presents European Research project (of FP7-SST-2008-RTD-1 for Surface transportation TRANSFEU. Projects undertakes to deliver both a reliable toxicity measurement methodology and a holistic fire safety approach for all kind of surface transport. It bases on a harmonized Fire Safety Engineering methodology which link passive fire security with active fire security mode. This all embracing system is the key to attain optimum design solutions in respect to fire safety objectives as an alternative to the prescriptive approach. It will help in the development of innovative solutions (design and products used for the building of the surface transport which will better respect the environment.In order to reach these objectives new toxicity measurement methodology and related classification of materials, new numerical fire simulation tools, fire test methodology (laboratory and full scale and a decisive tool to optimize or explore new design in accordance to the fire safety requirements will be developed.

  10. Nuclear Safety Project - annual report 1980

    International Nuclear Information System (INIS)

    1981-08-01

    The Annual Report 1980 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1980 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work completed, essential results, plans for the near future. (orig./RW) [de

  11. Light water reactor safety research project

    International Nuclear Information System (INIS)

    Markoczy, G.; Aksan, S.N.; Behringer, K.; Prodan, M.; Stierli, F.; Ullrich, G.

    1980-07-01

    The research and development activities for the safety of Light Water Power Reactors carried out 1979 at the Swiss Federal Institute for Reactor Research are described. Considerations concerning the necessity, objectives and size of the Safety Research Project are presented, followed by a detailed discussion of the activities in the five tasks of the program, covering fracture mechanics and nondestructive testing, thermal-hydraulics, reactor noise analysis and pressure vessel steel surveillance. (Auth.)

  12. Nuclear safety research project. Annual report 1995

    International Nuclear Information System (INIS)

    Hueper, R.

    1996-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZK) has been part of the Nuclear Safety Research Project (PSF) since 1990. The present annual report 1995 summarizes the R and D results. The research tasks are coordinated in agreement with internal and external working groups. The contributions to this report correspond to the status of early 1996. An abstract in English precedes each of them, whenever the respective article is written in German. (orig.) [de

  13. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  14. Safety issues and updates under MR environments

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Soo Jung; Kim, Kyung Ah, E-mail: bellenina@daum.net

    2017-04-15

    Highlights: • Unexpected biological effects can occur within stronger magnetic fields. • MR safety for MR conditional items is not guaranteed beyond the tested conditions. • Updated knowledge about MR-related safety is important for a safe MR environment. - Abstract: Magnetic resonance (MR) imaging is a useful imaging tool with superior soft tissue contrast for diagnostic evaluation. The MR environments poses unique risks to patients and employees differently from ionizing radiation exposure originated from computed tomography and plain x-ray films. The technology associated with MR system has evolved continuously since its introduction in the late 1970s. MR systems have advanced with static magnetic fields, faster and stronger gradient magnetic fields and more powerful radiofrequency transmission coils. Higher field strengths of MR offers greater signal to noise capability and better spatial resolution, resulting in better visualization of anatomic detail, with a reduction in scan time. With the rapid evolution of technology associated with MR, we encounter new MR-related circumstances and unexpected dangerous conditions. A comprehensive update of our knowledge about MR safety is necessary to prevent MR-related accidents and to ensure safety for patients and staff associated with MR. This review presents an overview about MR-related safety issues and updates.

  15. Outline of criticality safety research project

    International Nuclear Information System (INIS)

    Kobayashi, Iwao; Tachimori, Shoichi; Suzaki, Takenori; Takeshita, Isao; Miyoshi, Yoshinori; Nakajima, Ken; Sakurai, Satoshi; Yanagisawa, Hiroshi

    1987-01-01

    As the power generation capacity of LWRs in Japan increased, the establishment and development of nuclear fuel cycle have become the important subject. Conforming to the safety research project of the nation, the Japan Atomic Energy Research Institute has advanced the project of constructing a new research facility, that is, Nuclear Fuel Cycle Engineering Research Facility (NUCEF). In this facility, it is planned to carry out the research on criticality safety, upgraded reprocessing techniques, and the treatment and disposal of transuranium element wastes. In this paper, the subjects of criticality safety research and the research carried out with a criticality safety experiment facility which is expected to be installed in the NUCEF are briefly reported. The experimental data obtained from the criticality safety handbooks and published literatures in foreign countries are short of the data on the mixture of low enriched uranium and plutonium which is treated in the reprocessing of spent fuel from LWRs. The acquisition of the criticality data for various forms of fuel, the elucidation of the scenario of criticality accidents, and the soundness of the confinement system for gaseous fission products and plutonium are the main subjects. The Static Criticality Safety Facility, Transient Criticality Safety Facility and pulse column system are the main facilities. (Kako, I.)

  16. Environment, safety, and health manual, closeout report

    International Nuclear Information System (INIS)

    1975-12-01

    A coordination draft of the Environment, Safety, and Health (ES and H) manual was submitted on 2 September 1975. Comments provided by Operational Safety personnel were being incorporated by a task team when the effort was terminated on 31 October 1975. This report documents the development history of the manual and provides a status of the manual up to the time the efforts were discontinued. Also discussed are issues which effect completion of the manual. Additionally a plan for completion of the manual is suggested

  17. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  18. Implementing Software Safety in the NASA Environment

    Science.gov (United States)

    Wetherholt, Martha S.; Radley, Charles F.

    1994-01-01

    Until recently, NASA did not consider allowing computers total control of flight systems. Human operators, via hardware, have constituted the ultimate safety control. In an attempt to reduce costs, NASA has come to rely more and more heavily on computers and software to control space missions. (For example. software is now planned to control most of the operational functions of the International Space Station.) Thus the need for systematic software safety programs has become crucial for mission success. Concurrent engineering principles dictate that safety should be designed into software up front, not tested into the software after the fact. 'Cost of Quality' studies have statistics and metrics to prove the value of building quality and safety into the development cycle. Unfortunately, most software engineers are not familiar with designing for safety, and most safety engineers are not software experts. Software written to specifications which have not been safety analyzed is a major source of computer related accidents. Safer software is achieved step by step throughout the system and software life cycle. It is a process that includes requirements definition, hazard analyses, formal software inspections, safety analyses, testing, and maintenance. The greatest emphasis is placed on clearly and completely defining system and software requirements, including safety and reliability requirements. Unfortunately, development and review of requirements are the weakest link in the process. While some of the more academic methods, e.g. mathematical models, may help bring about safer software, this paper proposes the use of currently approved software methodologies, and sound software and assurance practices to show how, to a large degree, safety can be designed into software from the start. NASA's approach today is to first conduct a preliminary system hazard analysis (PHA) during the concept and planning phase of a project. This determines the overall hazard potential of

  19. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  20. D5.2 Project web environment

    OpenAIRE

    Fernie, Kate; Usher, Carol

    2011-01-01

    This deliverable presents a snapshot of the project web environment in July 2011. The project website http://www.digcur-education.org/eng was launched in month one of the project. The aim of this site is to provide information about the project to stakeholders and to related projects, as well as provide an Intranet for members of the project consortium. The website includes a ‘Join Us’ page to encourage interested parties to register as members of the DigCurV network, to receive the p...

  1. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  2. Project safety as a sustainable competitive advantage.

    Science.gov (United States)

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  3. Nuclear Safety Project. Annual report 1986

    International Nuclear Information System (INIS)

    1987-09-01

    The annual report 1986 is a detailed description of work within the Nuclear Safety Project performed in 1986 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes individual research activities on dynamic loads and strains of reactor components under accident conditions, fuel behaviour under accident conditions, investigation and control of LWR core-meltdown accidents, improvement of fission product retention and reduction of radiation exposure, and on behaviour, impact and removal of released pollutants. (DG)

  4. The International Criticality Safety Benchmark Evaluation Project

    International Nuclear Information System (INIS)

    Briggs, B. J.; Dean, V. F.; Pesic, M. P.

    2001-01-01

    In order to properly manage the risk of a nuclear criticality accident, it is important to establish the conditions for which such an accident becomes possible for any activity involving fissile material. Only when this information is known is it possible to establish the likelihood of actually achieving such conditions. It is therefore important that criticality safety analysts have confidence in the accuracy of their calculations. Confidence in analytical results can only be gained through comparison of those results with experimental data. The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the US Department of Energy. The project was managed through the Idaho National Engineering and Environmental Laboratory (INEEL), but involved nationally known criticality safety experts from Los Alamos National Laboratory, Lawrence Livermore National Laboratory, Savannah River Technology Center, Oak Ridge National Laboratory and the Y-12 Plant, Hanford, Argonne National Laboratory, and the Rocky Flats Plant. An International Criticality Safety Data Exchange component was added to the project during 1994 and the project became what is currently known as the International Criticality Safety Benchmark Evaluation Project (ICSBEP). Representatives from the United Kingdom, France, Japan, the Russian Federation, Hungary, Kazakhstan, Korea, Slovenia, Yugoslavia, Spain, and Israel are now participating on the project In December of 1994, the ICSBEP became an official activity of the Organization for Economic Cooperation and Development - Nuclear Energy Agency's (OECD-NEA) Nuclear Science Committee. The United States currently remains the lead country, providing most of the administrative support. The purpose of the ICSBEP is to: (1) identify and evaluate a comprehensive set of critical benchmark data; (2) verify the data, to the extent possible, by reviewing original and subsequently revised documentation, and by talking with the

  5. Safety level assessment in the production environment using Fuzzy logic

    Directory of Open Access Journals (Sweden)

    2012-05-01

    Conclusion: The application of the proposed method can reveal which safety items and factors are most important in improving workers safety, and therefore decide where to concentrate resources in order to improve the safety of the work environment.

  6. Environment, health and safety progress report 1997

    International Nuclear Information System (INIS)

    1998-01-01

    Imperial Oil is Canada's largest producer of crude oil and a major producer of natural gas. It is also the largest refiner and marketer of petroleum products, sold mainly under the Esso brand. Imperial Oil, in participation with Syncrude Canada, is also a major developer of the oil sands reserves in Cold Lake, Alberta. This review of environmental and health and safety performance in 1997 highlights the Company's comprehensive approach to risk management to reduce risk to safety, health and the environment. It is noted that in 1997, the Company's employee and contractor safety performance continued to be among the best in the industry. Potentially hazardous incidents decreased as a consequence of Imperial Oil's more stringent health and safety management system. Environmental compliance notifications fell by more than half in 1997. During the year there was a slight increase in hazardous wastes, due to the loss of outlets for recycling some materials. The National Pollutants Release Inventory indicates that Imperial has reduced emissions and offsite transfers by 25 per cent since 1993. Volatile organic compounds have been reduced by 60 per cent since 1993. According to the report all Imperial Oil facilities operate well within the guidelines for sulphur dioxide emissions. 1 tab., 10 figs

  7. Institute for Environment, Health and Safety

    International Nuclear Information System (INIS)

    Loos, M.

    2007-01-01

    The article describes the key activities of the Institute for Environment, Health and Safety of the Belgian Nuclear Research Centre SCK-CEN. Through the performance of experiments, the development of models and the integration of human sciences in our R and D, propose new durable methods, computer codes and measuring instruments for radiation protection, management and disposal of radioactive waste and dismantling of nuclear installations. These developments belong to the disciplines environmental chemistry, radiobiology and radioecology and include the transfer of radio nuclides in the geosphere and biosphere, as also the behaviour of micro-organisms in space

  8. MOBILITY, ENVIRONMENT AND SAFETY IN MEGACITIES

    Directory of Open Access Journals (Sweden)

    Dinesh MOHAN

    2000-01-01

    Full Text Available This paper focuses on issues concerning mobility, pollution and safety in megacities of less motorised countries (LMCs using Delhi (India as an example. Issues discussed are: Urban transport and land use patterns, planning, systems management and infrastructure development, fuel quality and alternate fuels, control of car ownership, in-use maintenance and inspection, fuel efficiency and technologies, pedestrian and bicycle environments and road safety. The patterns of traffic and management issues in LMCs are very complex and some of their problems have not been faced by the richer countries in the past. In LMC cities' non-motorised modes of transport and some form of public transport/para-transit already constitute a significant proportion of all trips. It will be difficult to increase this share unless these modes are made much more convenient and safer. Unless people actually perceive that they are not inconvenienced or exposed to greater risks as bicyclists, pedestrians and bus commuters it will be difficult to reduce private vehicle use. Buses and non-motorised modes of transport will remain the backbone of mobility in LMC mega-cities. To control pollution both bus use and non-motorised forms of transport have to be given importance without increasing the rate of road accidents. These issues have to be considered in an overall context where safety and environmental research efforts are not conducted in complete isolation.

  9. Management of nanomaterials safety in research environment.

    Science.gov (United States)

    Groso, Amela; Petri-Fink, Alke; Magrez, Arnaud; Riediker, Michael; Meyer, Thierry

    2010-12-10

    Despite numerous discussions, workshops, reviews and reports about responsible development of nanotechnology, information describing health and environmental risk of engineered nanoparticles or nanomaterials is severely lacking and thus insufficient for completing rigorous risk assessment on their use. However, since preliminary scientific evaluations indicate that there are reasonable suspicions that activities involving nanomaterials might have damaging effects on human health; the precautionary principle must be applied. Public and private institutions as well as industries have the duty to adopt preventive and protective measures proportionate to the risk intensity and the desired level of protection. In this work, we present a practical, 'user-friendly' procedure for a university-wide safety and health management of nanomaterials, developed as a multi-stakeholder effort (government, accident insurance, researchers and experts for occupational safety and health). The process starts using a schematic decision tree that allows classifying the nano laboratory into three hazard classes similar to a control banding approach (from Nano 3--highest hazard to Nano1--lowest hazard). Classifying laboratories into risk classes would require considering actual or potential exposure to the nanomaterial as well as statistical data on health effects of exposure. Due to the fact that these data (as well as exposure limits for each individual material) are not available, risk classes could not be determined. For each hazard level we then provide a list of required risk mitigation measures (technical, organizational and personal). The target 'users' of this safety and health methodology are researchers and safety officers. They can rapidly access the precautionary hazard class of their activities and the corresponding adequate safety and health measures. We succeed in convincing scientist dealing with nano-activities that adequate safety measures and management are promoting

  10. Management of nanomaterials safety in research environment

    Directory of Open Access Journals (Sweden)

    Riediker Michael

    2010-12-01

    Full Text Available Abstract Despite numerous discussions, workshops, reviews and reports about responsible development of nanotechnology, information describing health and environmental risk of engineered nanoparticles or nanomaterials is severely lacking and thus insufficient for completing rigorous risk assessment on their use. However, since preliminary scientific evaluations indicate that there are reasonable suspicions that activities involving nanomaterials might have damaging effects on human health; the precautionary principle must be applied. Public and private institutions as well as industries have the duty to adopt preventive and protective measures proportionate to the risk intensity and the desired level of protection. In this work, we present a practical, 'user-friendly' procedure for a university-wide safety and health management of nanomaterials, developed as a multi-stakeholder effort (government, accident insurance, researchers and experts for occupational safety and health. The process starts using a schematic decision tree that allows classifying the nano laboratory into three hazard classes similar to a control banding approach (from Nano 3 - highest hazard to Nano1 - lowest hazard. Classifying laboratories into risk classes would require considering actual or potential exposure to the nanomaterial as well as statistical data on health effects of exposure. Due to the fact that these data (as well as exposure limits for each individual material are not available, risk classes could not be determined. For each hazard level we then provide a list of required risk mitigation measures (technical, organizational and personal. The target 'users' of this safety and health methodology are researchers and safety officers. They can rapidly access the precautionary hazard class of their activities and the corresponding adequate safety and health measures. We succeed in convincing scientist dealing with nano-activities that adequate safety measures and

  11. MATHEMATICAL APPARATUS FOR KNOWLEDGE BASE PROJECT MANAGEMENT OF OCCUPATIONAL SAFETY

    Directory of Open Access Journals (Sweden)

    Валентина Николаевна ПУРИЧ

    2015-05-01

    Full Text Available The occupational safety project (OSP management is aimed onto a rational choice implementation. With respect to the subjectivity of management goals the project selection is considered as a minimum formalization level information process, The proposed project selection model relies upon the enterprise’s occupational and industrial safety assessment using fuzzy logic and linguistic variables based on occupational safety knowledge base.

  12. Technical safety appraisal of the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1989-09-01

    This report presents the results of one in a series of Technical Safety Appraisals (TSAs) being conducted of DOE nuclear operations by the Assistant Secretary for Environment, Safety, and Health Office of Safety Appraisals TSAs are one of the ititiatives announced by the Secretary of Energy on September 18, 1985, to enhance the DOE environment, safety and health program. This report presents the results of a TSA of the West Valley Demonstration Project (WVDP). The appraisal was conducted by a team of exerts assembled by the DOE Office of Safety Appraisal and was conducted during onsite visits of June 26-30 and July 10-21, 1989. West Valley, about 30 miles south of Buffalo, New York is the location of the only commercial nuclear fuel reprocessing facility operated in the United States. Nuclear Fuels Services, Inc. (NFS) operated the plant from 1966 to 1972 and processed about 640 metric tons of spent reactor fuel. The reprocessing operation generated about 560,000 gallons of high-level radioactive waste, which was transferred into underground tanks for storage. In 1972 NFS closed the plant and subsequently decided not to reopen it

  13. Sixth ITER technical meeting on safety and environment

    International Nuclear Information System (INIS)

    Saji, G.; Baker, D.

    1997-01-01

    The article summarizes the topics of the Sixth Technical Meeting on Safety and Environment which was held to review the first draft of the Non-Site Specific Safety Report (NSSR-2) and the draft of the ITER Final Design Report Safety Assessment (FDR-Safety) during October 27 - November 4, 1997 at the ITER San Diego Joint Work Site

  14. Project Aquarius. Control of radioisotopes and safety

    Energy Technology Data Exchange (ETDEWEB)

    Post, Roy G [Department of Nuclear Engineering, University of Arizona (United States)

    1970-05-15

    The potential application of nuclear explosives to the development of water resources provides real hope for substantial increases in the availability of water from our natural water supplies. A wide range, exploratory project sponsored by the United States Atomic Energy Commission, the Bureau of Reclamation, the Arizona Atomic Energy Commission, and The University of Arizona was conducted by the Hydrology and Water Resources Office, the Department of Nuclear Engineering, and various state and federal governmental agencies in exploring the potential applications of nuclear explosives for developing water resources in the State of Arizona. The primary objective of the project was of a scouting nature, a reconnaissance effort to assess the potential for Arizona. This work, Project Aquarius, is at an early state and any significant conclusions are certainly premature. Since this is a survey, detailed analyses are not justified. Our purpose is to define limiting problems and estimate our ability to solve them. We do not seek to formulate a detailed solution until the project has been defined better. In all of the plowshare activities the primary responsibility of the Atomic Energy Commission for safety and control of not only radiological but all hazards has been well defined and documented. Thus, the work here does not reflect any opinion or voice of the Atomic Energy Commission but is based on my own views and conclusions. I have referred to the work of the various laboratories, offices, and contractors of the Atomic Energy Commission.

  15. Project Aquarius. Control of radioisotopes and safety

    International Nuclear Information System (INIS)

    Post, Roy G.

    1970-01-01

    The potential application of nuclear explosives to the development of water resources provides real hope for substantial increases in the availability of water from our natural water supplies. A wide range, exploratory project sponsored by the United States Atomic Energy Commission, the Bureau of Reclamation, the Arizona Atomic Energy Commission, and The University of Arizona was conducted by the Hydrology and Water Resources Office, the Department of Nuclear Engineering, and various state and federal governmental agencies in exploring the potential applications of nuclear explosives for developing water resources in the State of Arizona. The primary objective of the project was of a scouting nature, a reconnaissance effort to assess the potential for Arizona. This work, Project Aquarius, is at an early state and any significant conclusions are certainly premature. Since this is a survey, detailed analyses are not justified. Our purpose is to define limiting problems and estimate our ability to solve them. We do not seek to formulate a detailed solution until the project has been defined better. In all of the plowshare activities the primary responsibility of the Atomic Energy Commission for safety and control of not only radiological but all hazards has been well defined and documented. Thus, the work here does not reflect any opinion or voice of the Atomic Energy Commission but is based on my own views and conclusions. I have referred to the work of the various laboratories, offices, and contractors of the Atomic Energy Commission

  16. Project for the completion of a probabilistic safety analysis of an industrial irradiation

    International Nuclear Information System (INIS)

    Ferro, R.; Troncoso, M.

    1995-01-01

    The probabilistic safety analysis is a very valuable instrument in safety studies of facilities with potential risk for the personnel, population and environment. One of the possible field of use of PSA techniques in the safety studies for industrial irradiation where serious accidents have occurred. For this reason a project has been undertaken to carry out the PSA in the Irradiation Plant of Research Institute of the Food Industry, which complements the safety studies of this facility

  17. Health, safety and environment : annual report 2000

    International Nuclear Information System (INIS)

    2000-01-01

    A natural gas transmission and power services company, TransCanada Pipelines Limited operates approximately 38,000 kilometers of pipeline, thereby supplying the majority of natural gas production facilities in Western Canada. The company is also involved in the power generation industry by building, operating and owning interests in electric power plants. Located in Rhode Island, United States, the largest plant operated by TransCanada is a combined-cycle plant that generates in excess of 500 MW. TransCanada is committed to its health, safety and environment management system. The system is modeled after the elements of the International Organization for Standardization (ISO) 14001 which sets the standard for environmental management systems. Considerable efforts were expanded to implement programs and initiatives to protect the environment, such as the pipeline reclamation criteria, the hazardous materials and waste management, and proposed polychlorinated biphenyl (PCB) regulations, which are currently under consideration by Environment Canada. TransCanada PipeLines Limited has also set up an environmental research program to enable management and workers to minimize the environmental impacts of the business. Its objectives are the enhancement of the health and safety of employees and their communities, the mitigation of effects on lands, air and water. The topics covered by the research are: vegetation and wildlife with several sub-categories. The company is concerned about the effects on climate change, and developed plans and strategies to manage the emissions of greenhouse gases. In the process, it was awarded several awards for its commitment, action and leadership on voluntary reduction program of greenhouse gases. Full-time resources are dedicated to illness prevention and health promotion, employee assistance programs, short and long term disability management and others. During the year 2000, TransCanada invested 4 million dollars in communities

  18. Technology Development, Evaluation, and Application (TDEA) FY 2001 Progress Report Environment, Safety, and Health (ESH) Division

    Energy Technology Data Exchange (ETDEWEB)

    L.G. Hoffman; K. Alvar; T. Buhl; E. Foltyn; W. Hansen; B. Erdal; P. Fresquez; D. Lee; B. Reinert

    2002-05-01

    This progress report presents the results of 11 projects funded ($500K) in FY01 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division (ESH). Five projects fit into the Health Physics discipline, 5 projects are environmental science and one is industrial hygiene/safety. As a result of their TDEA-funded projects, investigators have published sixteen papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplement funds and in-kind contributions, such as staff time, instrument use, and workspace, were also provided to TDEA-funded projects by organizations external to ESH Divisions.

  19. Use of safety management practices for improving project performance.

    Science.gov (United States)

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  20. Report on safety and the environment 1992-93

    International Nuclear Information System (INIS)

    1993-09-01

    The steps taken by AEA Technology to implement high safety and environmental standards and performance levels achieved are summarized. AEA's policy on safety and the environment is stated. The way that safety is organised, how plant safety cases are made, plant operations and safety 1992-93 and decommissioning work at several of AEA's plants are reported. Radiological doses for AEA plants are shown to have fallen since 1990. General industrial and office safety, what is learned from accidents and incidents, how the environment is protected, the occupational health services provided and the emergency arrangements in operation are also mentioned briefly. (UK)

  1. Safety Culture Enhancement Project. Final Report. A Field Study on Approaches to Enhancement of Safety Culture

    International Nuclear Information System (INIS)

    Lowe, Andrew; Hayward, Brent

    2006-08-01

    Safety Culture Perceptions Questionnaire conducted with site managers to access their opinions about the adequacy of the local safety culture; - a framework of safety-related competencies for managers, representing desirable actions for leading and promoting a positive safety culture; - results of an evaluation survey completed by participants at the conclusion of the Management Workshops to assess the utility of this activity. Section 4 of the report, Recommendations for Future Action, highlights nine proposed activities that could be undertaken to build on the outcomes from this project, to support the enhancement of safety culture within the Swedish nuclear industry in the longer term. Specifically, these recommendations propose actions to: 1. Introduce formal processes to ensure the ongoing development of safety related competencies amongst industry managers. 2. Strengthen the resources, contribution, value and profile of Man Technology Organisation (MTO) expertise within nuclear industry sites, in order to promote a better understanding of human performance issues, enhance error management and accident prevention capabilities. 3. Identify ways to embed existing positive safety culture attributes, in an environment of considerable workforce changes resulting from increasing use of contractors and (expected) retirements amongst an ageing industry employee population. 4. Standardise and improve aspects of incident and accident investigation processes and analysis methodologies currently used, to improve information sharing and optimise learning. 5. Implement harmonised MTO / human factors awareness training programs at appropriate levels for all nuclear industry personnel. 6. Formalise the application of applied teamwork training (as per the principles of Crew Resource Management training in aviation) for NPP Control Room Operators, Maintenance workers and other employees working in safety-critical teams. 7. Increase the use of simulation training to enhance non

  2. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  3. Safety Culture Enhancement Project. Final Report. A Field Study on Approaches to Enhancement of Safety Culture

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, Andrew; Hayward, Brent (Dedale Asia Pacific, Albert Park VIC 3206 (Australia))

    2006-08-15

    results of the Safety Culture Perceptions Questionnaire conducted with site managers to access their opinions about the adequacy of the local safety culture; - a framework of safety-related competencies for managers, representing desirable actions for leading and promoting a positive safety culture; - results of an evaluation survey completed by participants at the conclusion of the Management Workshops to assess the utility of this activity. Section 4 of the report, Recommendations for Future Action, highlights nine proposed activities that could be undertaken to build on the outcomes from this project, to support the enhancement of safety culture within the Swedish nuclear industry in the longer term. Specifically, these recommendations propose actions to: 1. Introduce formal processes to ensure the ongoing development of safety related competencies amongst industry managers. 2. Strengthen the resources, contribution, value and profile of Man Technology Organisation (MTO) expertise within nuclear industry sites, in order to promote a better understanding of human performance issues, enhance error management and accident prevention capabilities. 3. Identify ways to embed existing positive safety culture attributes, in an environment of considerable workforce changes resulting from increasing use of contractors and (expected) retirements amongst an ageing industry employee population. 4. Standardise and improve aspects of incident and accident investigation processes and analysis methodologies currently used, to improve information sharing and optimise learning. 5. Implement harmonised MTO / human factors awareness training programs at appropriate levels for all nuclear industry personnel. 6. Formalise the application of applied teamwork training (as per the principles of Crew Resource Management training in aviation) for NPP Control Room Operators, Maintenance workers and other employees working in safety-critical teams. 7. Increase the use of simulation training to

  4. The Citizenship Safety Project: a pilot study.

    Science.gov (United States)

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  5. Highway Safety, Economic Behavior, and Driving Environment

    OpenAIRE

    Keeler, Theodore E.

    1991-01-01

    Economic analysis has enhanced our understanding of the efficacy of highway safety regulations. Specifically, a consumer-theoretic literature has developed on drivers' responses to regulations, based on ideas first set forth by Lester lave and W. E. Weber (1970) and more fully thought out by Sam Peltzman (1975). Meanwhile, an empirical literature has also developed, testing hypotheses relating to the effects on safety of speed limits, safety-device regulations, and alcohol policies, among oth...

  6. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  7. Eighth ITER technical meeting on safety and environment

    International Nuclear Information System (INIS)

    Gordon, C.; Raeder, J.

    2000-01-01

    From November 27 to 30, 2000 the Eighth ITER Technical Meeting on Safety and Environment was held by the ITER Joint Central Team (JCT) at the Garching Joint Work Site, which also hosts the ITER Safety, Environment and Health Group (SEHG). At this meeting, safety experts from the Home Teams (HT) worked together with the SEHG members towards the following main objectives: review of Generic Site Safety Report (GSSR) results and drafts; review of the Plant Design Description (PDD) summary of safety; update on the status of the R and D tasks contributing to GSSR

  8. 75 FR 73946 - Worker Safety and Health Program: Safety Conscious Work Environment

    Science.gov (United States)

    2010-11-30

    ... Environment AGENCY: Office of the General Counsel, Department of Energy (DOE). ACTION: Notice of denial of... Nuclear Regulatory Commission's ``Safety-Conscious Work Environment'' guidelines as a model. DOE published.... Second, not only would instituting a ``Safety-Conscious Work Environment'' by regulation be redundant...

  9. Research activities in radiation protection. Programme report 1996. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Thieme, M.; Goedde, R.

    1997-02-01

    On behalf of the Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Department Research Programme of the year 1996. (orig.) [de

  10. Project communication management in complex environments

    CERN Document Server

    Ying, Zhong

    2014-01-01

    This unique book that deals with project communication management in complex environments, taking a leaf from China’s experience with a major earthquake in Sichuan, would be a timely contribution to fill this lacuna. Readers would be able to understand how companies and organizations that are unprepared for crisis management would react to their detriment. The lessons provided in this book are the only one of its kind to highlight the lessons for companies and organizations to prepare themselves for successful project communication management through the complexity-informed framework. Although the book is written by two building professionals, the concepts and lessons presented are generic and equally applicable for businesses outside of the construction industry; for example, for airports, resorts, hotels, shipyards, etc.

  11. The environment of the Olympic Dam project

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The Olympic Dam uranium/copper/gold project at Roxby Downs, South Australia, has a harsh environment with high summer temperatures, low rainfall and poor quality soils. There are no natural water courses. The vegetation is dominated by annual grasses in summer and wildflowers in winter. Red kangaroos are the most commonly sighted native mammals. The Fat-tailed Dunnart a nocturnal carniverous marsupial, is found. Eighty three bird species have been recorded. Reptiles are numerous and one amphibian occurs. A vermin eradication program aimed at rabbit control is conducted. ills

  12. Optimization of safety on pavement preservation projects.

    Science.gov (United States)

    2011-01-01

    To achieve a goal of reducing highway crash fatalities by 4% each year to improve roadway safety, the Georgia Department of Transportation (GDOT) is actively seeking opportunities to incorporate safety improvements into its current pavement preservat...

  13. Pacific Northwest Laboratory annual report for 1987 to the Assistant Secretary for Environment, Safety, and Health: Part 5: Environment, safety, health, and quality assurance

    International Nuclear Information System (INIS)

    Faust, L.G.; Steelman, B.L.; Selby, J.M.

    1988-02-01

    Part 5 of the 1987 Annual Report to the US Department of Energy's Assistant Secretary for Environment, Safety, and Health presents Pacific Northwest Laboratory's progress on work performed for the Office of Nuclear Safety, the Office of Environmental Guidance and Compliance, the Office of Environmental Audit, and the Office of National Environmental Policy Act Project Assistance. For each project, as identified by the Field Work Proposal, articles describe progress made during fiscal year 1987. Authors of these articles represent a broad spectrum of capabilities derived from five of the seven technical centers of the Laboratory, reflecting the interdisciplinary nature of the work

  14. Ninth ITER technical meeting on safety and environment

    International Nuclear Information System (INIS)

    Raeder, J.; Gordon, C.

    2001-01-01

    The ninth ITER Technical Meeting on safety and environment, the last in the course of the ITER Engineering Design Activities (EDA), was held at the ITER Garching Joint Work site, 8 to 10 May 2001. At this Meeting, safety experts from the House Teams worked together with the members of the Safety, Environment and Health Groups (SEHG) of the ITER Joint Central Team (JCT) in the following areas: finalization of the Generic Site Safety report (GSSR) which is considered to be the most important objective of the present work; summary of the safety related R and D work done by the Home Teams for ITER during EDA; review of verification and validation work done on computer codes being applied for Safety and Environment (S and E) analyses; outline of work considered necessary for improving the S and E database, quantifying uncertainties of the code results and preparing the adaptation of ITER to a specific site

  15. Enhancing Safety Culture in Complex Nuclear Industry Projects

    International Nuclear Information System (INIS)

    Gotcheva, N.

    2016-01-01

    This paper presents an on-going research project “Management principles and safety culture in complex projects” (MAPS), supported by the Finnish Research Programme on Nuclear Power Plant Safety 2015-2018. The project aims at enhancing safety culture and nuclear safety by supporting high quality execution of complex projects in the nuclear industry. Safety-critical industries are facing new challenges, related to increased outsourcing and complexity in technology, work tasks and organizational structures (Milch and Laumann, 2016). In the nuclear industry, new build projects, as well as modernisation projects are temporary undertakings often carried out by networks of companies. Some companies may have little experience in the nuclear industry practices or consideration of specific national regulatory requirements. In large multinational subcontractor networks, the challenge for assuring nuclear safety arises partly from the need to ensure that safety and quality requirements are adequately understood and fulfilled by each partner. Deficient project management practices and unsatisfactory nuclear safety culture in project networks have been recognised as contributing factors to these challenges (INPO, 2010). Prior evidence indicated that many recent major projects have experienced schedule, quality and financial challenges both in the nuclear industry (STUK, 2011) and in the non-nuclear domain (Ahola et al., 2014; Brady and Davies, 2010). Since project delays and quality issues have been perceived mainly as economic problems, project management issues remain largely understudied in safety research. However, safety cannot be separated from other performance aspects if a systemic view is applied. Schedule and quality challenges may reflect deficiencies in coordination, knowledge and competence, distribution of roles and responsibilities or attitudes among the project participants. It is increasingly understood that the performance of the project network in all

  16. Expediting Clinician Adoption of Safety Practices: The UCSF Venous Access Patient Safety Interdisciplinary Education Project

    National Research Council Canada - National Science Library

    Donaldson, Nancy E; Plank, Rosemary K; Williamson, Ann; Pearl, Jeffrey; Kellogg, Jerry; Ryder, Marcia

    2005-01-01

    ...) Venous Access Device (VAD) Patient Safety Interdisciplinary Education Project was to develop a 30-hour/one clinical academic unit VAD patient safety course with the aim of expediting clinician adoption of critical concepts...

  17. Overview of ISTC projects related to the environment

    International Nuclear Information System (INIS)

    Meyer, U.

    2002-01-01

    The field of ENVIRONMENT is the largest of the 14 technology areas within the International Science and Technology Center (ISTC). As of June 2000, more than 160 environmental projects have been selected for funding; this equals about 19% of all approved ISTC projects, one of the highest of all ISTC application areas. Provided funds total about US $55 million, 22% of the ISTC's allocated budget. The statistics verify that ENVIRONMENT is the most active technical area in reviews and funding in the ISTC. In general terms, this fact documents the strong interest of the financing parties in environmental purposes and indicates their desire to support the effort in the development of improved processes and innovative technologies for the solution of urgent environmental problems and for their future prevention in the CIS. The content and objectives of the approved projects include the following topics: Radioactive Waste Treatment and Disposal, Monitoring and Instrumentation, Modeling and Risk Assessment, Remediation and Decontamination, Environmental Health and Safety, Seismic Monitoring, and Pollution of Air and Water. The projects are devoted to nuclear and nonnuclear environmental issues in similar proportion. (author)

  18. Alberta Environment's weir safety program : options for rehabilitation to improve public safety : a case study of the Calgary weir

    Energy Technology Data Exchange (ETDEWEB)

    Blakely, D [Alberta Environment, Edmonton, AB (Canada)

    2009-07-01

    Alberta Environment Water Management Operations (WMO) owns and operates 46 dams and 800 kilometres of canals in Alberta. The WMO consists of 120 staff and several contract operators to take care of this infrastructure. Most of the infrastructure supplies water for irrigation use, which adds 5 billion dollars to the provincial economy annually. Other water uses include stock watering, domestic use, municipal use, recreational use and habitat. Alberta Environment's weir safety program was also discussed along with options for rehabilitation to improve public safety. A case study of Calgary's Weir Dam on the Bow River was highlighted. A brief history of the dam was offered and safety programs around provincially-owned weirs were discussed. Photographs were included to illustrate some of the additional safety measures at the Calgary weir, such as suspended safety buoys upstream of the boom directing paddlers to the portage trail, and signage on the river that can be activated when the boom is out. Typical river users on the Calgary Bow River and safety history at the Calgary Weir were discussed along with other topics such as the Calgary Bow River weir project criteria; project design progress; pre-feasibility options; scale modelling; final design analysis; construction funding; and proposed changes to the safety program for the new weir configuration. figs.

  19. Safety in an international work environment: CERN

    CERN Document Server

    Potter, K.

    1990-01-01

    The European Laboratory for Particle Physics (CERN) has recently completed a new accelerator. The installation of this accelerator and its experimental areas represents an example of harmonization of safety rules in supranational areas, as CERN is an international organization and the machine is housed in a tunnel of 26.7 km circumference, of which 20 km is on French territory and 6.7 km on Swiss territory. The work was carried out by a large number of firms from all over Europe, CERN staff and physicists and technicians from all over the world, and represented almost 4 million working hours. The safety organization chosen and applied with the agreement of the two host-State safety authorities is described and the resulting application, including the results in terms of accident statistics, from the installation of the machine, experimental areas and detectors are presented.

  20. Environment and safety: major goals for MARS

    International Nuclear Information System (INIS)

    Maninger, R.C.

    1983-01-01

    The Mirror Advanced Reactor Study (MARS) is a conceptual design study for a commercial fusion power reactor. One of the major goals of MARS is to develop design guidance so that fusion reactors can meet reasonable expectations for environmental health and safety. One of the first steps in the assessment of health and safety requirements was to examine what the guidelines might be for health and safety in disposal of radioactive wastes from fusion reactors. Then, using these quidelines as criteria, the impact of materials selection upon generation of radioactive wastes through neutron activation of structural materials was investigated. A conclusion of this work is that fusion power systems may need substantial engineering effort in new materials development and selection to meet the probable publicly acceptable levels of radioactivity for waste disposal in the future

  1. Design of plant safety model in plant enterprise engineering environment

    International Nuclear Information System (INIS)

    Gabbar, Hossam A.; Suzuki, Kazuhiko; Shimada, Yukiyasu

    2001-01-01

    Plant enterprise engineering environment (PEEE) is an approach aiming to manage the plant through its lifecycle. In such environment, safety is considered as the common objective for all activities throughout the plant lifecycle. One approach to achieve plant safety is to embed safety aspects within each function and activity within such environment. One ideal way to enable safety aspects within each automated function is through modeling. This paper proposes a theoretical approach to design plant safety model as integrated with the plant lifecycle model within such environment. Object-oriented modeling approach is used to construct the plant safety model using OO CASE tool on the basis of unified modeling language (UML). Multiple views are defined for plant objects to express static, dynamic, and functional semantics of these objects. Process safety aspects are mapped to each model element and inherited from design to operation stage, as it is naturally embedded within plant's objects. By developing and realizing the plant safety model, safer plant operation can be achieved and plant safety can be assured

  2. Enhancing agent safety through autonomous environment adaptation

    CSIR Research Space (South Africa)

    Rosman, Benjamin S

    2015-08-01

    Full Text Available limit their ability to interact with and explore their environments. In this work we address this risk through the incorporation of a caregiver robot, and present a model allowing it to autonomously adapt its environment to minimize danger for other...

  3. Domestic offset projects in the built environment

    Energy Technology Data Exchange (ETDEWEB)

    Oikonomou, V.; Spijker, E.; Van der Gaast, W. [Joint Implementation Network, Laan Corpus den Hoorn 300, 9728JT Groningen (Netherlands); Flamos, A.; Spyridaki, N.A. [Department of Industrial Management, University of Piraeus, Karaoli and Dimitriou 80 Str, 185 34 Piraeus (Greece)

    2012-08-15

    Emission reduction activities in the European Union (EU) in- and outside the European Trading System (ETS) thus far have largely taken place separately. One possibility to combine the two is through linking Non-ETS offset project-based crediting schemes in the form of Joint Implementation or domestic offset (DO) projects with the EU ETS. Linking would allow non-ETS offset project-based CO2 credits to be traded within the ETS market. This paper discusses the merits and drawbacks of the implementation of a DO scheme in the built environment in the Netherlands. The built environment can be characterised as a sector with a great diversity and significant energy savings potential. Emphasis is paid on the modalities for estimating energy savings under DO projects. The authors discuss if next to existing EU, national or regional policies in the Netherlands, DO could spur initiatives in sub-sectors or market areas that are difficult to reach with conventional policy instruments. Thus, despite the existing policy framework in this sector, there could be still space for DO to reach the untapped energy savings potential. DO can support activities and technologies that are not covered by other policy instruments, either because they are not part of the instruments focus or are above the minimum requirements of the incumbent policy targets. It is expected that some lessons from this study in the Netherlands can be taken into account also by other countries facing similar market circumstances, which have implemented several policy instruments and are considering DO schemes as an alternative for capturing part of the untapped energy saving potential in their end use sectors. Another possible advantage of DO is that it has the potential to reduce public spending on existing policy goals, when it is considered in conjunction with existing public financing instruments. In order to tap into this potential, there are a series of hurdles in place, like additionality and the current CO2

  4. Criticality safety benchmark evaluation project: Recovering the past

    Energy Technology Data Exchange (ETDEWEB)

    Trumble, E.F.

    1997-06-01

    A very brief summary of the Criticality Safety Benchmark Evaluation Project of the Westinghouse Savannah River Company is provided in this paper. The purpose of the project is to provide a source of evaluated criticality safety experiments in an easily usable format. Another project goal is to search for any experiments that may have been lost or contain discrepancies, and to determine if they can be used. Results of evaluated experiments are being published as US DOE handbooks.

  5. Health, Safety, and Environment Division: Annual progress report 1987

    Energy Technology Data Exchange (ETDEWEB)

    Rosenthal, M.A. (comp.)

    1988-04-01

    The primary responsibility of the Health, Safety, and Environment (HSE) Division at the Los Alamos National Laboratory is to provide comprehensive occupational health and safety programs, waste processing, and environment protection. These activities are designed to protect the worker, the public, and the environment. Many disciplines are required to meet the responsibilities, including radiation protection, industrial hygiene, safety, occupational medicine, environmental science, epidemiology, and waste management. New and challenging health and safety problems arise occasionally from the diverse research and development work of the Laboratory. Research programs in HSE Division often stem from these applied needs. These programs continue but are also extended, as needed to study specific problems for the Department of Energy and to help develop better occupational health and safety practices.

  6. Health, Safety, and Environment Division: Annual progress report 1987

    International Nuclear Information System (INIS)

    Rosenthal, M.A.

    1988-04-01

    The primary responsibility of the Health, Safety, and Environment (HSE) Division at the Los Alamos National Laboratory is to provide comprehensive occupational health and safety programs, waste processing, and environment protection. These activities are designed to protect the worker, the public, and the environment. Many disciplines are required to meet the responsibilities, including radiation protection, industrial hygiene, safety, occupational medicine, environmental science, epidemiology, and waste management. New and challenging health and safety problems arise occasionally from the diverse research and development work of the Laboratory. Research programs in HSE Division often stem from these applied needs. These programs continue but are also extended, as needed to study specific problems for the Department of Energy and to help develop better occupational health and safety practices

  7. Applying the behaviour grid for improving safety in industrial environments

    NARCIS (Netherlands)

    Boer, de J. (Johannes); Heylen, D. (Dirk); Teeuw, W.B. (Wouter)

    2013-01-01

    The Saxion University of Applied Sciences recently started its “Safety at Work” project. Its objective is to increase safety in the workplace by combining and applying state-of-the-art factors from Ambient Intelligence, Industrial & Product Design and Smart Materials [1].The human

  8. Technology Development, Evaluation, and Application (TDEA) FY 1999 Progress Report, Environment, Safety, and Health (ESH) Division

    Energy Technology Data Exchange (ETDEWEB)

    Larry G. Hoffman

    2000-12-01

    This progress report presents the results of 10 projects funded ($500K) in FY99 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Five are new projects for this year; seven projects have been completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published thirty-four papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space, were also provided to TDEA-funded projects by organizations external to ESH Division.

  9. Technology Development, Evaluation, and Application (TDEA) FY 1999 Progress Report, Environment, Safety, and Health (ESH) Division

    International Nuclear Information System (INIS)

    Hoffman, Larry G.

    2000-01-01

    This progress report presents the results of 10 projects funded ($500K) in FY99 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Five are new projects for this year; seven projects have been completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published thirty-four papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space, were also provided to TDEA-funded projects by organizations external to ESH Division

  10. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  11. The modification of main steam safety valves in Qinshan phase Ⅱ expansion project

    International Nuclear Information System (INIS)

    Chen Haiqiao

    2012-01-01

    The main steam safety valves of NPP steam system are second- class nuclear safety component. It used to limit the pressure of SG secondary side and main steam system via emitting steam into the environment. At present, the main steam safety valves have mechanical valves and assisted power valves. According to the experience of power plants at home and abroad, including Qinshan Phase Ⅱ unit 1/2 experience feedback, Qinshan Phase Ⅱ expansion project made modification on valve type, setting value and valve body. This paper introduce the characteristics of different safety valve types, the modification of main steam safety valves and the modification analysis on safety issues.security and impact on the other systems in Qinshan Phase Ⅱ expansion project. (author)

  12. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  13. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  14. Hotel and Motel Fire Safety Project - USFA

    Data.gov (United States)

    Department of Homeland Security — Provides a listing of properties compliant with the requirements of the Hotel and Motel Fire Safety Act of 1990. Users may search for compliant properties and submit...

  15. Seventh ITER technical meeting on safety and environment

    International Nuclear Information System (INIS)

    Raeder, J.; Gordon, C.

    2000-01-01

    From February 15 to 18, 2000, the Seventy Technical Meeting on Safety and Environment was held at the Garching Joint Work Site which now hosts the Safety, Environment and Health Group of the ITER Joint Central Team. At this meeting, safety experts from the Home Teams worked with the SEHG members on reviews and agreements on the contents of GSSR and on the tasks and the schedule for the production of GSSR as well as the design information to be used and for the analyses to be done

  16. Health, Safety, and Environment Division annual report, 1988

    International Nuclear Information System (INIS)

    Rosenthal, M.A.

    1989-10-01

    The primary responsibility of the Health, Safety, and Environment (HSE) Division at the Los Alamos National Laboratory is to provide comprehensive occupational health and safety programs, waste processing, and environmental protection. These activities are designed to protect the worker, the public, and the environment. Many disciplines are required to meet the responsibilities, including radiation protection, industrial hygiene, safety, occupational medicine, environmental science, epidemiology, and waste management. New and challenging health and safety problems occasionally arise from the diverse research and development work of the Laboratory. Research programs in HSE Division often stem from these applied needs. These programs continue but are also extended, as needed, to study specific problems for the Department of Energy and to help develop better occupational health and safety practices. 52 refs

  17. Pacific Northwest Laboratory annual report for 1989 to the Assistant Secretary for Environment, Safety, and Health - Part 5: Environment, Safety, Health, and Quality Assurance

    Energy Technology Data Exchange (ETDEWEB)

    Faust, L.G.; Doctor, P.G.; Selby, J.M.

    1990-04-01

    Part 5 of the 1989 Annual Report to the US Department of Energy's Assistant Secretary for Environment, Safety, and Health presents Pacific Northwest Laboratory's progress on work performed for the Office of Environmental Guidance and Compliance, the Office of Environmental Audit, the Office of National Environmental Policy Act Project Assistance, the Office of Nuclear Safety, the Office of Safety Compliance, and the Office of Policy and Standards. For each project, as identified by the Field Work Proposal, there is an article describing progress made during fiscal year 1989. Authors of these articles represent a broad spectrum of capabilities derived from five of the seven technical centers of the Laboratory, reflecting the interdisciplinary nature of the work. 35 refs., 1 fig.

  18. Radiation protection research projects. Program report 2015. Report on research program radiation protection of the Federal ministry for environment, nature conservation and reactor safety with technical and administrative steering by the Bundesamt fuer Strahlenschutz; Strahlenschutzforschung. Programmreport 2015. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz, Bau und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Schmitt-Hannig, Annemarie; Loebke-Reinl, Angelika; Peter, Josef; Goedde, Ralph; Hachenberger, Claudia; Trugenberger-Schnabel, Angela (comps.)

    2016-08-15

    On behalf of the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. The tasks of the Federal Office for Radiation Protection involve planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects. This report provides information on results, i. e. preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMUB's Environmental Research Plan for the year 2015.

  19. Promoting Safety Environment for School Sports | Aluko | AFRREV ...

    African Journals Online (AJOL)

    The purpose of this study was to examine the safety environment under which school sports programme is organized in Nigeria schools. The paper noted that poor environment under which PES is administered militated against smooth attainment of physical education and sports in schools. In this regard the paper explored ...

  20. Project W-030 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventilation system upgrade under Project W-030, and recommends acceptance of the system as constructed, based on a review of supporting documentation

  1. The Safety Analysis of Shipborne Ammunition in Fire Environment

    Science.gov (United States)

    Ren, Junpeng; Wang, Xudong; Yue, Pengfei

    2017-12-01

    The safety of Ammunition has always been the focus of national military science and technology issues. And fire is one of the major safety threats to the ship’s ammunition storage environment, In this paper, Mk-82 shipborne aviation bomb has been taken as the study object, simulated the whole process of fire by using the FDS (Fire Detection System) software. According to the simulation results of FDS, ANSYS software was used to simulate the temperature field of Mk-82 carrier-based aviation bomb under fire environment, and the safety of aviation bomb in fire environment was analyzed. The result shows that the aviation bombs under the fire environment can occur the combustion or explosion after 70s constant cook-off, and it was a huge threat to the ship security.

  2. SNF fuel retrieval sub project safety analysis document

    International Nuclear Information System (INIS)

    BERGMANN, D.W.

    1999-01-01

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed

  3. SNF fuel retrieval sub project safety analysis document

    Energy Technology Data Exchange (ETDEWEB)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  4. Occupational Safety and Health Program at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    L. M. Calderon

    1999-01-01

    The West Valley Nuclear Services Co. LLC (WVNS) is committed to provide a safe, clean, working environment for employees, and to implement U.S. Department of Energy (DOE) requirements affecting worker safety. The West Valley Demonstration Project (WVDP) Occupational Safety and Health Program is designed to protect the safety, health, and well-being of WVDP employees by identifying, evaluating, and controlling biological, chemical, and physical hazards in the work place. Hazards are controlled within the requirements set forth in the reference section at the end of this report. It is the intent of the WVDP Occupational Safety and Health Program to assure that each employee is provided with a safe and healthy work environment. This report shows the logical path toward ensuring employee safety in planning work at the WVDP. In general, planning work to be performed safely includes: combining requirements from specific programs such as occupational safety, industrial hygiene, radiological control, nuclear safety, fire safety, environmental protection, etc.; including WVDP employees in the safety decision-making processes; pre-planning using safety support re-sources; and integrating the safety processes into the work instructions. Safety management principles help to define the path forward for the WVDP Occupational Safety and Health Program. Roles, responsibilities, and authority of personnel stem from these ideals. WVNS and its subcontractors are guided by the following fundamental safety management principles: ''Protection of the environment, workers, and the public is the highest priority. The safety and well-being of our employees, the public, and the environment must never be compromised in the aggressive pursuit of results and accomplishment of work product. A graded approach to environment, safety, and health in design, construction, operation, maintenance, and deactivation is incorporated to ensure the protection of the workers, the public, and the environment

  5. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  6. Integral urban project and safety. Building barriers or bridges?

    CSIR Research Space (South Africa)

    Landman, K

    2006-03-01

    Full Text Available Planning and design measures can be utilised successfully to enhance feelings of safety in areas where people feel vulnerable. The study of the relationship between crime and the physical environment has resulted in various theoretical approaches...

  7. Joint nuclear safety research projects between the US and Russian Federation International Nuclear Safety Centers

    International Nuclear Information System (INIS)

    Bougaenko, S.E.; Kraev, A.E.; Hill, D.L.; Braun, J.C.; Klickman, A.E.

    1998-01-01

    The Russian Federation Ministry for Atomic Energy (MINATOM) and the US Department of Energy (USDOE) formed international Nuclear Safety Centers in October 1995 and July 1996, respectively, to collaborate on nuclear safety research. Since January 1997, the two centers have initiated the following nine joint research projects: (1) INSC web servers and databases; (2) Material properties measurement and assessment; (3) Coupled codes: Neutronic, thermal-hydraulic, mechanical and other; (4) Severe accident management for Soviet-designed reactors; (5) Transient management and advanced control; (6) Survey of relevant nuclear safety research facilities in the Russian Federation; (8) Advanced structural analysis; and (9) Development of a nuclear safety research and development plan for MINATOM. The joint projects were selected on the basis of recommendations from two groups of experts convened by NEA and from evaluations of safety impact, cost, and deployment potential. The paper summarizes the projects, including the long-term goals, the implementing strategy and some recent accomplishments for each project

  8. Vandellos 1 decommissioning project. Safety before, during and after

    International Nuclear Information System (INIS)

    Rodriguez, A.

    2002-01-01

    The Nuclear Power Plant of Vandellos 1, a gas-graphite reactor (GCR), started operation in the 70's after 17 years running the decommissioning process began in 1998, and is expected to finish at the end of 2002 with the level 2 of decommissioning with a practically total scope reached, except the concrete reactor vessel and its internals that will remain for another 25 years in surveillance state (dormancy) until their total dismantling. During the last four years the activities related to decontamination and disassembly of the power plant system as well as the management of all this material have been carried out. One of the last phases of the project that will be performed this year, without doubt, one of the most representative of the operative difficulty of the task is the disassembly of some buildings which are more than 80 meters high and with some structures weighing more than 3.000 t, an operation, which is spectacular in terms of volume and mass involved. However one has to keep in mind that it has been preceded by the of clearance process of all these structures to be disassembled this summer. Hundred of thousands of radiological measures will confirm with guarantee that the destination of the dismantled materials is the correct one, assuring the protection of people and the environment. This is a process which has to integrate the principles of radiological safety and industrial safety. First, it has to be guaranteed that structures and components are below the values authorised by authorities for their free release, and, secondly, that the planned sequence of the process and manoeuvres in the disassembly of these colossal structures assures safety. (author)

  9. The USERDA transport R and D program for environment and safety

    International Nuclear Information System (INIS)

    Sisler, J.A.

    1976-01-01

    This paper describes the U.S. Energy Research and Development Administration's (ERDA) transportation environment and safety research and development program for energy fuels and wastes, including background, current activities, and future plans. It will serve as an overview and integrating factor for the several related technical papers to be presented at this meeting which will enlarge on the detail of specific projects. The transportation R and D program provides for the environmental and safety review of transport systems and procedures; standards development; and package, vehicle, and systems testing for nuclear materials transport. A primary output of the program is the collection, processing, and dissemination of transport environment and safety data, shipment statistics, and technical information. Special transport projects which do not easily fit elsewhere in ERDA are usually done as a part of this program. (author)

  10. LANL Safety Conscious Work Environment (SCWE) Self-Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hargis, Barbara C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-01-29

    On December 21, 2012 Secretary of Energy Chu transmitted to the Defense Nuclear Facilities Safety Board (DNFSB) revised commitments on the implementation plan for Safety Culture at the Waste Treatment and Immobilization Plant. Action 2-5 was revised to require contractors and federal organizations to complete Safety Conscious Work Environment (SCWE) selfassessments and provide reports to the appropriate U.S. Department of Energy (DOE) - Headquarters Program Office by September 2013. Los Alamos National Laboratory (LANL) planned and conducted a Safety Conscious Work Environment (SCWE) Self-Assessment over the time period July through August, 2013 in accordance with the SCWE Self-Assessment Guidance provided by DOE. Significant field work was conducted over the 2-week period August 5-16, 2013. The purpose of the self-assessment was to evaluate whether programs and processes associated with a SCWE are in place and whether they are effective in supporting and promoting a SCWE.

  11. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  12. Annual colloquium 1976 of the project nuclear safety

    International Nuclear Information System (INIS)

    1976-11-01

    The present report gives the full text of the nine papers read during the annual colloquium 1976 of the Project Nuclear Safety at Karlsruhe Nuclear Research Centre, in which the main activities and findings of the project in 1976 are contained. (RW) [de

  13. Research activities in radiation protection. Programme report 1997. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Goedde, R.; Thieme, M.

    1998-03-01

    On behalf of the Federal Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection (BfS) is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Departmental Research Programme of the year 1997. (orig.) [de

  14. Radiation safety at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Hoffman, R.L.

    1997-01-01

    This is a report on the Radiation Safety Program at the West Valley Demonstration Project (WVDP). This Program covers a number of activities that support high-level waste solidification, stabilization of facilities, and decontamination and decommissioning activities at the Project. The conduct of the Program provides confidence that all occupational radiation exposures received during operational tasks at the Project are within limits, standards, and program requirements, and are as low as reasonably achievable

  15. Laser safety at high profile projects

    Science.gov (United States)

    Barat, K.

    2011-03-01

    Laser Safety at high profile laser facilities tends to be more controlled than in the standard laser lab found at a research institution. The reason for this is the potential consequences for such facilities from incidents. This ranges from construction accidents, to equipment damage to personnel injuries. No laser user wants to sustain a laser eye injury. Unfortunately, many laser users, most commonly experienced researchers and inexperienced graduate students, do receive laser eye injuries during their careers. . More unforgiveable is the general acceptance of this scenario, as part of the research & development experience. How do senior researchers, safety personnel and management stop this trend? The answer lies in a cultural change that involves institutional training, user mentoring, hazard awareness by users and administrative controls. None of these would inhibit research activities. As a matter of fact, proper implementation of these controls would increase research productivity. This presentation will review and explain the steps needed to steer an institution, research division, group or individual lab towards a culture that should nearly eliminate laser accidents. As well as how high profile facilities try to avoid laser injuries. Using the definition of high profile facility as one who's funding in the million to billions of dollars or Euros and derives form government funding.

  16. Management of health, safety and environment in process industry

    DEFF Research Database (Denmark)

    Duijm, Nijs Jan; Fiévez, C.; Gerbec, M.

    2008-01-01

    The present status of industrial HSE management in a number of EU member states is reviewed, with a focus on the integration of health, safety and environment in single management systems. The review provides insight into the standards and paradigms adopted by industry, and it identifies trends...

  17. Study of system safety evaluation on LTO of national project. NISA safety research project on system safety of nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Masayuki; Sekimura, Naoto; Miyano, Hiroshi; Aoyama, Katsunobu

    2012-01-01

    Japanese safety regulatory body, that is, Nuclear and Industrial Safety Agency (NISA) started a 5-year national safety research project as 'the first stage' from 2006 FY to 2010 FY whose objective is 'Improve the technical information basis in order to utilize knowledge as well as information related to ageing management and maintenance of NPPs. Fukushima disaster happened in March 2011, and the priority of research needs for ageing management dramatically changed in Japan. The second-stage national project started in October 2011 with the concept of 'system safety' of NNPs where not only ageing management on degradation phenomena of important components but also safety management on total plant systems are paid attention to. The second-stage project is so called 'Japanese Ageing Management Program for System Safety (JAMPSS)'. (author)

  18. A root cause analysis project in a medication safety course.

    Science.gov (United States)

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  19. KfK Nuclear Safety Project. First semiannual report 1985

    International Nuclear Information System (INIS)

    1985-11-01

    The semiannual progress report 1985/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1985 in the nuclear safety field by KfK institutes and departements and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics: work performed, results obtained and plans for future work. (orig./HP) [de

  20. Technology Development, Evaluation, and Application (TDEA) FY 1998 Progress Report Environment, Safety, and Health (ESH) Division

    Energy Technology Data Exchange (ETDEWEB)

    Larry G. Hoffman; Kenneth Alvar; Thomas Buhl; Bruce Erdal; Philip Fresquez; Elizabeth Foltyn; Wayne Hansen; Bruce Reinert

    1999-06-01

    This progress report presents the results of 10 projects funded ($504K) in FY98 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Nine projects are new for this year; two projects were completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published 19 papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space were also provided to the TDEA-funded projects by organizations external to ESH Division. Products generated from the projects funded in FY98 included a new extremity dosimeter that replaced the previously used finger-ring dosimeters, a light and easy-to-use detector to measure energy deposited by neutron interactions, and a device that will allow workers to determine the severity of a hazard.

  1. Proceedings of the first annual Nuclear Criticality Safety Technology Project

    International Nuclear Information System (INIS)

    Rutherford, D.A.

    1994-09-01

    This document represents the published proceedings of the first annual Nuclear Criticality Safety Technology Project (NCSTP) Workshop, which took place May 12--14, 1992, in Gaithersburg, Md. The conference consisted of four sessions, each dealing with a specific aspect of nuclear criticality safety issues. The session titles were ''Criticality Code Development, Usage, and Validation,'' ''Experimental Needs, Facilities, and Measurements,'' ''Regulation, Compliance, and Their Effects on Nuclear Criticality Technology and Safety,'' and ''The Nuclear Criticality Community Response to the USDOE Regulations and Compliance Directives.'' The conference also sponsored a Working Group session, a report of the NCSTP Working Group is also presented. Individual papers have been cataloged separately

  2. Spent Nuclear Fuel (SNF) Project Safety Basis Implementation Strategy

    International Nuclear Information System (INIS)

    TRAWINSKI, B.J.

    2000-01-01

    The objective of the Safety Basis Implementation is to ensure that implementation of activities is accomplished in order to support readiness to move spent fuel from K West Basin. Activities may be performed directly by the Safety Basis Implementation Team or they may be performed by other organizations and tracked by the Team. This strategy will focus on five key elements, (1) Administration of Safety Basis Implementation (general items), (2) Implementing documents, (3) Implementing equipment (including verification of operability), (4) Training, (5) SNF Project Technical Requirements (STRS) database system

  3. Gas reactor in-pile safety test project (GRIST-2)

    International Nuclear Information System (INIS)

    Kelley, A.P. Jr.; Arbtin, E.; St Pierre, R.

    1979-01-01

    Although out-of-pile tests may be expected to confirm individual phenomena models in core disruptive accident analysis codes, only in-pile tests are capable of verifying the extremely complex integrated model effects within the appropriate time phase for these accidents. For this reason, the GRIST-2 project, the purpose of which is to design and construct an in-pile helium loop capable of transient safety testing in the TREAT facility in Idaho, forms a cornerstone of the US GCFR safety program. The project organization, experiment program, facility, helium system design, and schedule which have been selected to meet the objectives are described

  4. Overview of DOE/ONS criticality safety projects

    International Nuclear Information System (INIS)

    Barber, R.W.; Brown, B.P.; Hopper, C.M.

    1985-01-01

    The evolution of Federal involvement with nuclear criticality safety has traversed through the 1940's and early 1950's with the Manhattan Engineering District, the 1950's and 1960's with the Atomic Energy Commission, the early 1970's with the Energy Research and Development Administration, and the late 1970's to date with the US Department of Energy. The importance of nuclear criticality safety has been maintained throughout these periods; however, criticality safety has received shifting emphases in research/applications, promulgations of regulations/standards, origins of fiscal support and organization. In June 1981 the Office of Nuclear Safety was established in response to a Department of Energy study of the impact of the March 1979 Three Mile Island accident. The organizational structure of the ONS, its program for establishing and maintaining a progressive nuclear criticality safety program, and associated projects, and current history of ONS's fiscal support of program projects is presented. With the establishment of the ONS came concomitant missions to develop and maintain nuclear safety policy and requirements, to provide independent assurance that nuclear operations are performed safely, to provide resources and management for DOE responses to nuclear accidents, and to provide technical support. In the past four years, ONS has developed and initiated a continuing Department Nuclear Criticality Safety Program in such areas as communications and information, physics of criticality, knowledge of factors affecting criticality, and computational capability

  5. Understanding lean & safety projects: analysis of case studies

    Directory of Open Access Journals (Sweden)

    Maria Crema

    2017-12-01

    Full Text Available Facing the current socio-economic contingency while guaranteeing a high level of care quality is particularly challenging in the field of healthcare. Through an integrated adoption of emerging managerial solutions, projects that allow organizations to achieve both efficiency and patient safety improvements could be implemented, thereby transposing policy directives towards a safer and more sustainable healthcare system. Therefore, the purpose of this paper is to investigate the features of Lean & Safety (L&S projects. Three Health Lean Management (HLM projects that had unexpected patient safety results were selected from the same region. Differences and similarities among the cases have been highlighted and interesting points of evidence have been noted. Despite the fact that the projects were pursuing similar objectives and benefiting from comparable support, the obtained changes had direct impact on patient safety enhancement in the cases that involved the front-office processes, and an indirect impact on patient safely for the L&S project that focused on back-office activities. The implementation processes and the Information and Communication Technologies (ICT adoption of the cases are also different.

  6. Industrial safety in a nuclear decommissioning environment observations and lessons learned

    International Nuclear Information System (INIS)

    Brevig, D.

    2008-01-01

    Decommissioning activities present unusual and unexpected workplace safety challenges that go far beyond the traditional experience of nuclear power plant managers. A blend of state-of-the-art safety program management tools along with new and practical applications are required to ensure high industrial safety performance. The demanding and rigorously applied nuclear safety engineering standards that are accepted as normal and routine in the operation of a nuclear power facility, should transform as an industrial safety standard during the non-operating period of decommissioning. In addition, historical measures of non-nuclear industrial safety injury rates would or should not be acceptable safety behaviors during a nuclear decommissioning project. When complex projects, such as the decommissioning of a nuclear generating facility are undertaken, the workforce brings experience, qualifications, and assumptions to the project. The overall multi-year general schedule is developed, with more schedule details, for example, for the nearest rolling 12-18 months. Methods are established for the selection of contractors to assist in areas that are not normal tasks for the facility workforce, whose normal activity is managing and operating a nuclear generating station. However, it is critical to manage those contractors to the agreed work scope to ensure success is maintained by both parties, e.g. the job gets done, on schedule, on budget, all parties are financially whole when the work is complete, and safely. The purpose of this paper is to provide a perspective of nuclear plant personal safety in the ever changing industrial environment created by the demolition of robust and often radiologically contaminated structures in a nuclear facility decommissioning project. (author)

  7. Industrial safety in a nuclear decommissioning environment observations and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Brevig, D. [Independent Consultant, San Clemente (United States)

    2008-07-01

    Decommissioning activities present unusual and unexpected workplace safety challenges that go far beyond the traditional experience of nuclear power plant managers. A blend of state-of-the-art safety program management tools along with new and practical applications are required to ensure high industrial safety performance. The demanding and rigorously applied nuclear safety engineering standards that are accepted as normal and routine in the operation of a nuclear power facility, should transform as an industrial safety standard during the non-operating period of decommissioning. In addition, historical measures of non-nuclear industrial safety injury rates would or should not be acceptable safety behaviors during a nuclear decommissioning project. When complex projects, such as the decommissioning of a nuclear generating facility are undertaken, the workforce brings experience, qualifications, and assumptions to the project. The overall multi-year general schedule is developed, with more schedule details, for example, for the nearest rolling 12-18 months. Methods are established for the selection of contractors to assist in areas that are not normal tasks for the facility workforce, whose normal activity is managing and operating a nuclear generating station. However, it is critical to manage those contractors to the agreed work scope to ensure success is maintained by both parties, e.g. the job gets done, on schedule, on budget, all parties are financially whole when the work is complete, and safely. The purpose of this paper is to provide a perspective of nuclear plant personal safety in the ever changing industrial environment created by the demolition of robust and often radiologically contaminated structures in a nuclear facility decommissioning project. (author)

  8. Integrating environment health and safety management at Petro-Canada

    International Nuclear Information System (INIS)

    Raymond, G.

    1993-01-01

    Petro-Canada has developed a tool to integrate, measure, and improve its management systems of environment, health, and safety (EH ampersand S). This tool, called the Total Loss Management System, is described in the areas of general management issues, policies and procedures, evaluations, organization, stewardship, issue management, and performance measures. Petro-Canada's policies on occupational health and safety are consistent with its environmental policy, being structured in the same way. An integrated audit system is used to cover health, safety, industrial hygiene, reliability, environment, and risk management. EH ampersand S matters are integrated at the corporate level in a separate department. Regional divisions review EH ampersand S performance every month, incidents are discussed, and preventive measures are taken as necessary. Regional performances are combined every quarter for ultimate presentation to the Petro-Canada board. New or emerging issues that may affect divisions are assigned an issue sponsor, a member of divisional management who makes sure the issue receives the resources necessary to study and define its impact. Examples of issues include soil contamination, process hazard management, and benzene exposure limits. Performance measures flow from the corporate environment and occupational health and safety policies, and come in two types: those that measure activities to improve performance and those that measure the outcome of the activities

  9. Radiological safety research for nuclear excavation projects - Interoceanic canal studies

    International Nuclear Information System (INIS)

    Klement, A.W. Jr.

    1969-01-01

    The general radiological problems encountered in nuclear cratering and nuclear excavation projects are discussed. Procedures for assessing radiological problems in such projects are outlined. Included in the discussions are source term, meteorology, fallout prediction and ecological factors. Continuing research requirements as well as pre- and post-excavation studies are important considerations. The procedures followed in the current interoceanic canal feasibility studies provide examples of radiological safety problems, current solutions and needed research. (author)

  10. Radiological safety research for nuclear excavation projects - Interoceanic canal studies

    Energy Technology Data Exchange (ETDEWEB)

    Klement, Jr, A W [U.S. Atomic Energy Commission, Las Vegas, NV (United States)

    1969-07-01

    The general radiological problems encountered in nuclear cratering and nuclear excavation projects are discussed. Procedures for assessing radiological problems in such projects are outlined. Included in the discussions are source term, meteorology, fallout prediction and ecological factors. Continuing research requirements as well as pre- and post-excavation studies are important considerations. The procedures followed in the current interoceanic canal feasibility studies provide examples of radiological safety problems, current solutions and needed research. (author)

  11. The Nordic nuclear safety program 1994-1997. Project handbook

    International Nuclear Information System (INIS)

    1997-06-01

    This is a new revision of the handbook for administrators of the Nordic reactor safety program NKS. The most important administrative functions in project management are described, which should secure a uniform management approach in all the projects. The description of the organizational scheme of the NKS and distribution of responsibilities is followed by examples of various administrative routines and document forms. In the annex the names and addresses of the staff involved in administration of the NKS program are listed. (EG)

  12. Pacific Northwest Laboratory annual report for 1989 to the Assistant Secretary for Environment, Safety, and Health

    International Nuclear Information System (INIS)

    Faust, L.G.; Doctor, P.G.; Selby, J.M.

    1990-04-01

    Part 5 of the 1989 Annual Report to the US Department of Energy's Assistant Secretary for Environment, Safety, and Health presents Pacific Northwest Laboratory's progress on work performed for the Office of Environmental Guidance and Compliance, the Office of Environmental Audit, the Office of National Environmental Policy Act Project Assistance, the Office of Nuclear Safety, the Office of Safety Compliance, and the Office of Policy and Standards. For each project, as identified by the Field Work Proposal, there is an article describing progress made during fiscal year 1989. Authors of these articles represent a broad spectrum of capabilities derived from five of the seven technical centers of the Laboratory, reflecting the interdisciplinary nature of the work. 35 refs., 1 fig

  13. Pacific Northwest Laboratory annual report for 1990 to the Assistant Secretary for Environment, Safety, and Health

    International Nuclear Information System (INIS)

    Faust, L.G.; Moraski, R.V.; Selby, J.M.

    1991-05-01

    Part 5 of the 1990 Annual Report to the US Department of Energy's Assistant Secretary for Environment, Safety, and Health presents Pacific Northwest Laboratory's progress on work performed for the Office of Environmental Guidance, the Office of Environmental Compliance, the Office of Environmental Audit, the Office of National Environmental Policy Act Project Assistance, the Office of Nuclear Safety, the Office of Safety Compliance, and the Office of Policy and Standards. For each project, as identified by the Field Work Proposal, there is an article describing progress made during fiscal year 1990. Authors of these articles represent a broad spectrum of capabilities derived from five of the seven technical centers of the Laboratory, reflecting the interdisciplinary nature of the work

  14. Safety and the environment: Key to total quality

    International Nuclear Information System (INIS)

    Scott, J.N.

    1991-01-01

    The author briefly discusses the principles that guide the safety and environmental efforts of the petroleum industry. Specific examples are given of things that the industry is doing to carry out those principles. There are 12 principles which say that the petroleum industry will be responsive to the communities in which they operate. In general they say that waste will try to be eliminated; the industry will handle raw materials, products and waste in a safe manner; and that the petroleum industry will work with government to draft regulations that will improve the safety of the workplace and the environment

  15. Supporting Multiprocessors in the Icecap Safety-Critical Java Run-Time Environment

    DEFF Research Database (Denmark)

    Zhao, Shuai; Wellings, Andy; Korsholm, Stephan Erbs

    The current version of the Safety Critical Java (SCJ) specification defines three compliance levels. Level 0 targets single processor programs while Level 1 and 2 can support multiprocessor platforms. Level 1 programs must be fully partitioned but Level 2 programs can also be more globally...... scheduled. As of yet, there is no official Reference Implementation for SCJ. However, the icecap project has produced a Safety-Critical Java Run-time Environment based on the Hardware-near Virtual Machine (HVM). This supports SCJ at all compliance levels and provides an implementation of the safety......-critical Java (javax.safetycritical) package. This is still work-in-progress and lacks certain key features. Among these is the ability to support multiprocessor platforms. In this paper, we explore two possible options to adding multiprocessor support to this environment: the “green thread” and the “native...

  16. Software qualification for digital safety system in KNICS project

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Dong-Young; Choi, Jong-Gyun

    2012-01-01

    In order to achieve technical self-reliance in the area of nuclear instrumentation and control, the Korea Nuclear Instrumentation and Control System (KNICS) project had been running for seven years from 2001. The safety-grade Programmable Logic Controller (PLC) and the digital safety system were developed by KNICS project. All the software of the PLC and digital safety system were developed and verified following the software development life cycle Verification and Validation (V and V) procedure. The main activities of the V and V process are preparation of software planning documentations, verification of the Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and a testing of the software components, the integrated software, and the integrated system. In addition, a software safety analysis and a software configuration management are included in the activities. For the software safety analysis at the SRS and SDS phases, the software Hazard Operability (HAZOP) was performed and then the software fault tree analysis was applied. The software fault tree analysis was applied to a part of software module with some critical defects identified by the software HAZOP in SDS phase. The software configuration management was performed using the in-house tool developed in the KNICS project. (author)

  17. Proceedings of the Nuclear Criticality Technology and Safety Project Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, R.G. [comp.

    1994-01-01

    This report is the proceedings of the annual Nuclear Criticality Technology and Safety Project (NCTSP) Workshop held in Monterey, California, on April 16--28, 1993. The NCTSP was sponsored by the Department of Energy and organized by the Los Alamos Critical Experiments Facility. The report is divided into six sections reflecting the sessions outlined on the workshop agenda.

  18. Proceedings of the Nuclear Criticality Technology and Safety Project Workshop

    International Nuclear Information System (INIS)

    Sanchez, R.G.

    1994-01-01

    This report is the proceedings of the annual Nuclear Criticality Technology and Safety Project (NCTSP) Workshop held in Monterey, California, on April 16--28, 1993. The NCTSP was sponsored by the Department of Energy and organized by the Los Alamos Critical Experiments Facility. The report is divided into six sections reflecting the sessions outlined on the workshop agenda

  19. Proceedings of The First National Seminar on Safety, Public Health and Environment

    International Nuclear Information System (INIS)

    Hiswara, Eri; Bunawas; Dumais, Johannes P.; Alatas, Zubaidah; Melyani

    2001-11-01

    The first national seminar of safety, public health and environment was held in 23-24 Oct 2001 at the center for research and development of radiation safety and nuclear biomedicine natural energy agency, Indonesia have presented 27 papers, about safety, public health and environment the proceedings is expected to give illustration of the research result on safety, health and environment. (PPIN)

  20. Protection of environment, health and safety using risk management

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, G [Ghafari Associates, Inc. 17101 Michegan Avenue Dearborn, MI 48126-2736 (United States); Kummler, R H [Department of Chemical engineering Wayne Stae University Detroit, MI 48202 (United States); louvar, J [Research Services Basf Corporation Wyandotte, MI 48192 (United States)

    1997-12-31

    Section 304 of the 1990 clean air amendments (CAAA) directed the US occupational safety and health administration (OSFA) to develop a chemical process safety standard to protect workers on-site from accidents involving hazardous substances. OSHA issued 29 CFR 1910.119, process safety management of Highly hazardous chemicals (PSM) in 1992. Section 112 r of the CAAA further mandated that a standard be developed to protect the environment from accidental releases of hazardous substances. The US environmental protection agency (EPA) proposed such a standard in 1993 (58 Fr 54190) and revised their proposal in 1995). The final rule for risk management and accidental release prevention is more comprehensive and extensive than OSHA`s PSM standard. In this paper we will discuss the concepts of both programs, the classes of substances that would trigger a facility`s need for compliance and review the regulations for risk management.

  1. Protection of environment, health and safety using risk management

    International Nuclear Information System (INIS)

    Abraham, G.; Kummler, R.H.; louvar, J.

    1996-01-01

    Section 304 of the 1990 clean air amendments (CAAA) directed the US occupational safety and health administration (OSFA) to develop a chemical process safety standard to protect workers on-site from accidents involving hazardous substances. OSHA issued 29 CFR 1910.119, process safety management of Highly hazardous chemicals (PSM) in 1992. Section 112 r of the CAAA further mandated that a standard be developed to protect the environment from accidental releases of hazardous substances. The US environmental protection agency (EPA) proposed such a standard in 1993 (58 Fr 54190) and revised their proposal in 1995). The final rule for risk management and accidental release prevention is more comprehensive and extensive than OSHA's PSM standard. In this paper we will discuss the concepts of both programs, the classes of substances that would trigger a facility's need for compliance and review the regulations for risk management

  2. Safety culture and subcontractor network governance in a complex safety critical project

    International Nuclear Information System (INIS)

    Oedewald, Pia; Gotcheva, Nadezhda

    2015-01-01

    In safety critical industries many activities are currently carried out by subcontractor networks. Nevertheless, there are few studies where the core dimensions of resilience would have been studied in safety critical network activities. This paper claims that engineering resilience into a system is largely about steering the development of culture of the system towards better ability to anticipate, monitor, respond and learn. Thus, safety culture literature has relevance in resilience engineering field. This paper analyzes practical and theoretical challenges in applying the concept of safety culture in a complex, dynamic network of subcontractors involved in the construction of a new nuclear power plant in Finland, Olkiluoto 3. The concept of safety culture is in focus since it is widely used in nuclear industry and bridges the scientific and practical interests. This paper approaches subcontractor networks as complex systems. However, the management model of the Olkiluoto 3 project is to a large degree a traditional top-down hierarchy, which creates a mismatch between the management approach and the characteristics of the system to be managed. New insights were drawn from network governance studies. - Highlights: • We studied a relevant topical subject safety culture in nuclear new build project. • We integrated safety science challenges and network governance studies. • We produced practicable insights in managing safety of subcontractor networks

  3. Proceedings of the nuclear criticality technology safety project

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, R.G. [comp.

    1997-06-01

    This document contains summaries of the most of the papers presented at the 1994 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 10 and 11 at Williamsburg, Va. The meeting was broken up into seven sessions, which covered the following topics: (1) Validation and Application of Calculations; (2) Relevant Experiments for Criticality Safety; (3) Experimental Facilities and Capabilities; (4) Rad-Waste and Weapons Disassembly; (5) Criticality Safety Software and Development; (6) Criticality Safety Studies at Universities; and (7) Training. The minutes and list of participants of the Critical Experiment Needs Identification Workgroup meeting, which was held on May 9 at the same venue, has been included as an appendix. A second appendix contains the names and addresses of all NCTSP meeting participants. Separate abstracts have been indexed to the database for contributions to this proceedings.

  4. Proceedings of the nuclear criticality technology safety project

    International Nuclear Information System (INIS)

    Sanchez, R.G.

    1997-06-01

    This document contains summaries of the most of the papers presented at the 1994 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 10 and 11 at Williamsburg, Va. The meeting was broken up into seven sessions, which covered the following topics: (1) Validation and Application of Calculations; (2) Relevant Experiments for Criticality Safety; (3) Experimental Facilities and Capabilities; (4) Rad-Waste and Weapons Disassembly; (5) Criticality Safety Software and Development; (6) Criticality Safety Studies at Universities; and (7) Training. The minutes and list of participants of the Critical Experiment Needs Identification Workgroup meeting, which was held on May 9 at the same venue, has been included as an appendix. A second appendix contains the names and addresses of all NCTSP meeting participants. Separate abstracts have been indexed to the database for contributions to this proceedings

  5. Nuclear safety research project (PSF). 1999 annual report

    International Nuclear Information System (INIS)

    Muehl, B.

    2000-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZK) has been part of the Nuclear Safety Research Project (PSF) since 1990. The present annual report summarizes the R and D results of PSF during 1999. The research tasks cover three main topics: Light Water Reactor safety, innovative systems, and studies related to the transmutation of actinides. The importance of the Light Water Reactor safety, however, has decreased during the last year in favour of the transmutation of actinides. Numerous institutes of the research centre contribute to the PSF programme, as well as several external partners. The tasks are coordinated in agreement with internal and external working groups. The contributions to this report, which are either written in German or in English, correspond to the status of early/mid 2000. (orig.) [de

  6. Partnership project between Environment Canada and ECRC

    International Nuclear Information System (INIS)

    Duhaime, C.; Daigle, R.

    1996-01-01

    The partnership agreement between Environment Canada and Eastern Canada Response Ltd, (ECRC) which allows for rapid release of information to all levels of management in the event of an oil or chemical spill, was discussed. A geographic information system for emergency management, and an information sharing network is made available to all parties through Internet to assure a continuous exchange of information during an emergency. Mapping, surveying and information-exchange tools are designed for mutual integration and compatibility. The agreement was signed at the beginning of 1996 and the new system will be tested by occasional exercises beginning in September 1996. Modifications will be made as necessary. 5 figs

  7. A virtual therapeutic environment with user projective agents.

    Science.gov (United States)

    Ookita, S Y; Tokuda, H

    2001-02-01

    Today, we see the Internet as more than just an information infrastructure, but a socializing place and a safe outlet of inner feelings. Many personalities develop aside from real world life due to its anonymous environment. Virtual world interactions are bringing about new psychological illnesses ranging from netaddiction to technostress, as well as online personality disorders and conflicts in multiple identities that exist in the virtual world. Presently, there are no standard therapy models for the virtual environment. There are very few therapeutic environments, or tools especially made for virtual therapeutic environments. The goal of our research is to provide the therapy model and middleware tools for psychologists to use in virtual therapeutic environments. We propose the Cyber Therapy Model, and Projective Agents, a tool used in the therapeutic environment. To evaluate the effectiveness of the tool, we created a prototype system, called the Virtual Group Counseling System, which is a therapeutic environment that allows the user to participate in group counseling through the eyes of their Projective Agent. Projective Agents inherit the user's personality traits. During the virtual group counseling, the user's Projective Agent interacts and collaborates to recover and increase their psychological growth. The prototype system provides a simulation environment where psychologists can adjust the parameters and customize their own simulation environment. The model and tool is a first attempt toward simulating online personalities that may exist only online, and provide data for observation.

  8. Scientific projection paper for ecosystems and environment

    International Nuclear Information System (INIS)

    Gustafson, P.

    1980-01-01

    The pervasiveness of concern about ionizing radiation in the public mind stems, in considerable measure, from a lack of understanding about the behavior, fate, and presumed effects of radiation-emitting elements. This lack of understanding also is applicable to the standards and guidelines which are used to regulate the quantities of radionuclides which may be released to the environment. Radioecological research on the transport, movement, and effects of ionizing radiation is needed to verify the validity of the standards for release and to eliminate the potential errors that currently exist in assessing dose to human populations due to uncertainties in the environmental transport of radionuclides in terrestrial and aquatic ecosystems. We believe that the public concern over the impact of ionizing radiation (and therefore nuclear energy) could be alleviated considerably by directing more of our radiobiologic research effort to scientific questions related to standards and standard setting

  9. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  10. A comparison between the IAEA Safety Series 6 thermal environment and a proposed alternative thermal environment

    International Nuclear Information System (INIS)

    Wix, S.D.; Koski, J.A.

    1994-01-01

    The present regulations for packaging and transportation of radioactive materials, IAEA Safety Series No. 6; 1985, establish specific criteria for the thermal environment of a hypothetical accident. The regulation states: The scope of this paper is to examine the effects on modeling that result with the Fry proposed thermal boundary conditions. The examination is accomplished by comparing thermal model results using the current IAEA specified thermal environment and the Fry proposed thermal boundary conditions

  11. National ignition facility environment, safety, and health management plan

    International Nuclear Information System (INIS)

    1995-11-01

    The ES ampersand H Management Plan describes all of the environmental, safety, and health evaluations and reviews that must be carried out in support of the implementation of the National Ignition Facility (NIF) Project. It describes the policy, organizational responsibilities and interfaces, activities, and ES ampersand H documents that will be prepared by the Laboratory Project Office for the DOE. The only activity not described is the preparation of the NIF Project Specific Assessment (PSA), which is to be incorporated into the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (PEIS). This PSA is being prepared by Argonne National Laboratory (ANL) with input from the Laboratory participants. As the independent NEPA document preparers ANL is directly contracted by the DOE, and its deliverables and schedule are agreed to separately with DOE/OAK

  12. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    This document describes the calculations performed to determine the accident consequences for the W-058 safety analysis. Project W-058 is the replacement cross site transfer system (RCSTS), which is designed to transort liquid waste between the 200 W and 200 E areas. Calculations for RCSTS safety analyses used the same methods as the calculations for the Tank Waste Remediation System (TWRS) Basis for Interim Operation (BIO) and its supporting calculation notes. Revised analyses were performed for the spray and pool leak accidents since the RCSTS flows and pressures differ from those assumed in the TWRS BIO. Revision 1 of the document incorporates review comments

  13. International Criticality Safety Benchmark Evaluation Project (ICSBEP) - ICSBEP 2015 Handbook

    International Nuclear Information System (INIS)

    Bess, John D.

    2015-01-01

    The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the United States Department of Energy (DOE). The project quickly became an international effort as scientists from other interested countries became involved. The International Criticality Safety Benchmark Evaluation Project (ICSBEP) became an official activity of the Nuclear Energy Agency (NEA) in 1995. This handbook contains criticality safety benchmark specifications that have been derived from experiments performed at various critical facilities around the world. The benchmark specifications are intended for use by criticality safety engineers to validate calculation techniques used to establish minimum subcritical margins for operations with fissile material and to determine criticality alarm requirements and placement. Many of the specifications are also useful for nuclear data testing. Example calculations are presented; however, these calculations do not constitute a validation of the codes or cross-section data. The evaluated criticality safety benchmark data are given in nine volumes. These volumes span approximately 69000 pages and contain 567 evaluations with benchmark specifications for 4874 critical, near-critical or subcritical configurations, 31 criticality alarm placement/shielding configurations with multiple dose points for each, and 207 configurations that have been categorised as fundamental physics measurements that are relevant to criticality safety applications. New to the handbook are benchmark specifications for neutron activation foil and thermoluminescent dosimeter measurements performed at the SILENE critical assembly in Valduc, France as part of a joint venture in 2010 between the US DOE and the French Alternative Energies and Atomic Energy Commission (CEA). A photograph of this experiment is shown on the front cover. Experiments that are found unacceptable for use as criticality safety benchmark experiments are discussed in these

  14. Embodied agents in virtual environments: The Aveiro project

    NARCIS (Netherlands)

    Leiviska, K.; Heylen, Dirk K.J.; Nijholt, Antinus; Poel, Mannes

    2001-01-01

    We present current and envisaged work on the AVEIRO project of our research group concerning virtual environments inhabited by autonomous embodied agents. These environments are being built for researching issues in human-computer interactions and intelligent agent applications. We describe the

  15. Evolving Our Evaluation of Lighting Environments Project

    Science.gov (United States)

    Terrier, Douglas; Clayton, Ronald; Clark, Toni Anne

    2016-01-01

    Imagine you are an astronaut on their 100th day of your three year exploration mission. During your daily routine to the small hygiene compartment of the spacecraft, you realize that no matter what you do, your body blocks the light from the lamp. You can clearly see your hands or your toes but not both! What were those design engineers thinking! It would have been nice if they could have made the walls glow instead! The reason the designers were not more innovative is that their interpretation of the system lighting requirements didn't allow them to be so! Currently, our interior spacecraft lighting standards and requirements are written around the concept of a quantity of light illuminating a spacecraft surface. The natural interpretation for the engineer is that a lamp that throws light to the surface is required. Because of certification costs, only one lamp is designed and small rooms can wind up with lamps that may be inappropriate for the room architecture. The advances in solid state light emitting technologies and optics for lighting and visual communication necessitates the evaluation of how NASA envisions spacecraft lighting architectures and how NASA uses industry standards for the design and evaluation of lighting system. Current NASA lighting standards and requirements for existing architectures focus on the separate ability of a lighting system to throw light against a surface or the ability of a display system to provide the appropriate visual contrast. Realization that these systems can be integrated is not realized. The result is that the systems are developed independent from one another and potential efficiencies that could be realized from borrowing from the concept of one technology and applying it for the purpose of the other does not occur. This project investigated the possibility of incorporating large luminous surface lamps as an alternative or supplement to overhead lighting. We identified existing industry standards for architectural

  16. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  17. Design of marine structures with improved safety for environment

    International Nuclear Information System (INIS)

    Klanac, Alan; Varsta, Petri

    2011-01-01

    The paper describes a method for design of marine structures with increased safety for environment, considering also the required investment costs as well as the aspects of risk distribution onto the maritime stakeholders. Practically, the paper seeks to answer what is the optimal amount that should be invested into certain safety measure for any given vessel. Due to the uneven distribution of risk, as well as the differing impact of costs emerging from safety improvements, stakeholders experience conflicting ranking of alternatives. To solve this multi-stakeholder decision-making problem, in which each stakeholder is a decision-maker, the method applies concepts of group decision-making theory, namely the Game Theory. The method fosters axiomatic definition of the optimum solution, arguing that the solution, or the final selected design, should satisfy the non-dominance, efficiency, and fairness. These three are thoroughly discussed in terms of structural design, especially the latter. Considering the coupling of environmental risk and structural design, the method also builds on the preference structure of four maritime stakeholders: yards, owners, oil receivers and the public, who either share the risks or directly influence structural design. Method is presented on a practical study of structural design of a tanker with a crashworthy side structure that is capable of reducing the risk of collision. The outcome of this study outlines a number of possibilities for successful improvement of tanker safety that can benefit, concurrently, all maritime stakeholders.

  18. How to communicate safety? Some reflections from European project studies

    International Nuclear Information System (INIS)

    Richardson, Philip; Galson, Daniel

    2009-12-01

    Attempts to site geological disposal facilities for radioactive waste - and associated public reactions - indicate that communicating safety and demonstrating safety are very different things. The three different approaches to stakeholder engagement undertaken in the context of the PAMINA, ARGONA and CIP projects have provided valuable insights into how risk communication processes and tools can be improved. The approaches used in these projects all involve the participation of interested stakeholders in identifying concerns and issues, which are then examined in a co-operative fashion between stakeholders and developers acting in partnership. Such approaches offer avenues for dialogue and confidence building where such channels were previously not well developed, Full results from the projects will be available in late 2009 for PAMINA and ARGONA and in early 2010 for CIP. The comments and interim insights outlined here will be developed further and incorporated in the overall project outputs, and help inform developing European policy in this area. It is already clear, however, that the approaches used in these projects offer great promise in helping to develop the trust in the institutions and organisations involved that is essential in gaining support and acceptance for the waste management activities now underway across Europe

  19. Safety reassessment of the Paks NPP (the AGNES project)

    Energy Technology Data Exchange (ETDEWEB)

    Gado, J [Hungarian Academy of Sciences, Budapest (Hungary). Central Research Inst. for Physics; Bajsz, J; Cserhati, A; Elter, J [Paksi Atomeroemue Vallalat, Paks (Hungary); Hollo, E [Energiagazdalkodasi Intezet, Budapest (Hungary); Kovacs, K [EROTERV Engineering and Contractor Co (Hungary); Maroti, L [Hungarian Academy of Sciences, Budapest (Hungary). Central Research Inst. for Physics; Miko, S [Paksi Atomeroemue Vallalat, Paks (Hungary); Techy, Z [Energiagazdalkodasi Intezet, Budapest (Hungary); Vidovszky, I [Hungarian Academy of Sciences, Budapest (Hungary). Central Research Inst. for Physics

    1996-12-31

    The reassessment of the Paks NPP safety according to internationally recognized criteria of the Advanced General and New Evaluation of Safety (AGNES) project is outlined. The Paks NPP consists of four WWER-440/V-213 units. The following groups of analysis have been performed: system analysis and description; analysis of design basis accidents; severe accidents analysis; level 1 probabilistic safety analysis. Postulated accidents (PA) and Anticipated Operational Occurrences (AOO) are estimated in detail for the following initiating events: increase/decrease in secondary heat removal; decrease in primary coolant inventory; increase/decrease of reactor coolant inventory; reactivity and power distribution anomalies; analysis of transients with the failure of reactor scram (ATWS); pressurized thermal shock analyses. Severe accident analysis was made for the accidents on in-vessel phase and containment phase, for radioactive release and for accident management.

  20. The International Criticality Safety Benchmark Evaluation Project on the Internet

    International Nuclear Information System (INIS)

    Briggs, J.B.; Brennan, S.A.; Scott, L.

    2000-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in October 1992 by the US Department of Energy's (DOE's) defense programs and is documented in the Transactions of numerous American Nuclear Society and International Criticality Safety Conferences. The work of the ICSBEP is documented as an Organization for Economic Cooperation and Development (OECD) handbook, International Handbook of Evaluated Criticality Safety Benchmark Experiments. The ICSBEP Internet site was established in 1996 and its address is http://icsbep.inel.gov/icsbep. A copy of the ICSBEP home page is shown in Fig. 1. The ICSBEP Internet site contains the five primary links. Internal sublinks to other relevant sites are also provided within the ICSBEP Internet site. A brief description of each of the five primary ICSBEP Internet site links is given

  1. Safety reassessment of the Paks NPP (the AGNES project)

    International Nuclear Information System (INIS)

    Gado, J.; Hollo, E.; Kovacs, K.; Maroti, L.; Techy, Z.; Vidovszky, I.

    1995-01-01

    The reassessment of the Paks NPP safety according to internationally recognized criteria of the Advanced General and New Evaluation of Safety (AGNES) project is outlined. The Paks NPP consists of four WWER-440/V-213 units. The following groups of analysis have been performed: system analysis and description; analysis of design basis accidents; severe accidents analysis; level 1 probabilistic safety analysis. Postulated accidents (PA) and Anticipated Operational Occurrences (AOO) are estimated in detail for the following initiating events: increase/decrease in secondary heat removal; decrease in primary coolant inventory; increase/decrease of reactor coolant inventory; reactivity and power distribution anomalies; analysis of transients with the failure of reactor scram (ATWS); pressurized thermal shock analyses. Severe accident analysis was made for the accidents on in-vessel phase and containment phase, for radioactive release and for accident management

  2. The International Criticality Safety Benchmark Evaluation Project (ICSBEP)

    International Nuclear Information System (INIS)

    Briggs, J.B.

    2003-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in 1992 by the United States Department of Energy. The ICSBEP became an official activity of the Organisation for Economic Cooperation and Development (OECD) - Nuclear Energy Agency (NEA) in 1995. Representatives from the United States, United Kingdom, France, Japan, the Russian Federation, Hungary, Republic of Korea, Slovenia, Yugoslavia, Kazakhstan, Israel, Spain, and Brazil are now participating. The purpose of the ICSBEP is to identify, evaluate, verify, and formally document a comprehensive and internationally peer-reviewed set of criticality safety benchmark data. The work of the ICSBEP is published as an OECD handbook entitled 'International Handbook of Evaluated Criticality Safety Benchmark Experiments.' The 2003 Edition of the Handbook contains benchmark model specifications for 3070 critical or subcritical configurations that are intended for validating computer codes that calculate effective neutron multiplication and for testing basic nuclear data. (author)

  3. Nordic projects in the field of nuclear safety

    International Nuclear Information System (INIS)

    Soerensen, H.C.

    1988-05-01

    This report deseribes the work in 1987 within the Nordic program concerning nuclear safety 1985-1989. The report has the form of a handbook meant for those in Scandinavia who are involved in nuclear safety, and it is based on statements from the constituent subject fields of the program. The first chapter is a short summary of the work and results over the year. In the next chapter an account is given of the ongoing projects within each of the subject fields. An economic survey of the entire program and a list of the reports and articles published in 1987 is included in the publication as well. Chapter 5 is a complete list of adresses comprising participants, project managers, program coordinators and members of the advisory group. (SH) 74 refs

  4. Nordic projects in the field of nuclear safety

    International Nuclear Information System (INIS)

    Soerensen, H.C.

    1989-07-01

    This report describes the work in 1988 within the Nordic program concerning nuclear safety 1985-1989. The report has the form of a handbook meant for those in Scandinavia who are involeved in nuclear safety, and it is based on statements from the constituent subject fields of the program. The first chapter is a short summary of the work and results over the year. In the next chapter an account is given of the ongoing projects within each of the subject fields. An economic survey of the entire program and a list of the reports and articles published in 1988 is included in the publicaltion as well. Chapter 5 is a complete list of adresses comprising participants, project managers, program coordinators and members of the advirosy group. (SH)

  5. Approaches to safety, environment and regulatory approval for the International Thermonuclear Experimental Reactor

    International Nuclear Information System (INIS)

    Saji, G.; Bartels, H.W.; Chuyanov, V.; Holland, D.; Kashirski, A.V.; Morozov, S.I.; Piet, S.J.; Poucet, A.; Raeder, J.; Rebut, P.H.; Topilski, L.N.

    1995-01-01

    International Thermonuclear Experimental Reactor (ITER) Engineering Design Activities (EDA) in safety and environment are approaching the point where conceptual safety design, topic studies and research will give way to project oriented engineering design activities. The Joint Central Team (JCT) is promoting safety design and analysis necessary for siting and regulatory approval. Scoping studies are underway at the general level, in terms of laying out the safety and environmental design framework for ITER. ITER must follow the nuclear regulations of the host country as the future construction site of ITER. That is, regulatory approval is required before construction of ITER. Thus, during the EDA, some preparations are necessary for the future application for regulatory approval. Notwithstanding the future host country's jurisdictional framework of nuclear regulations, the primary responsibility for safety and reliability of ITER rests with the legally responsible body which will operate ITER. Since scientific utilization of ITER and protection of the large investment depends on safe and reliable operation of ITER, we are highly motivated to achieve maximum levels of operability, maintainability, and safety. ITER will be the first fusion facility in which overall 'nuclear safety' provisions need to be integrated into the facility. For example, it will be the first fusion facility with significant decay heat and structural radiational damage. Since ITER is an experimental facility, it is also important that necessary experiments can be performed within some safety design limits without requiring extensive regulatory procedures. ITER will be designed with such a robust safety envelope compatible with the fusion power and the energy inventories. The basic approach to safety will be realized by 'defense-in-depth'. (orig.)

  6. Health and Environment Project In Benin

    Directory of Open Access Journals (Sweden)

    Raphaël Edou

    2010-02-01

    Full Text Available In 1989, the Republic of Benin was facing great social and economic upheavals. In 1990, the Canadian and American Mennonite missionaries created the Bethesda Health Care Centre.  In 1993, assessment of the hospital activities showed that many people were coming back to the centre repeatedly with the same illnesses linked to sanitation aspects and living conditions. The Community Development and Environmental Protection Department (DCAM was thus established to face this great challenge. It quickly helped the community and the local authorities to establish a waste management system.  The Programme for Sanitation and Protection of the Environment (PrAPE was designed and funded by the French Embassy and Evangelische Entwicklungsdienst V.e (EED, a German Christian organization. Households then began to subscribe for the collection of their wastes. Bethesda began to assist other communities to put in place waste management systems. Today, it is working throughout the country with many municipalities. While the programme was being implemented, we discovered that the community needed to be supported in their revenue generating activities. We set up in 1996, a solidarity-based microfinance system. The savings of some people were used to grant credit to others. This community bank has developed into a large bank today. In 2006, a system of mutual insurance was put in place. A complete integrated system to address the basic needs of the community was thus set up.En 1989, la République du Bénin a été confrontée à d’importants bouleversements sociaux et économiques. En 1990, des missionnaires mennonites canadiens et américains ont créé le Centre de santé Bethesda. En 1993, l’évaluation des activités hospitalières a montré que de nombreuses personnes revenaient à plusieurs reprises au centre avec les mêmes maladies liées à des problèmes d’assainissement et aux conditions de vie. Le département Développement Communautaire et

  7. Ferrocyanide safety project ferrocyanide aging studies. Final report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200 degrees C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990

  8. Food Labeling and Consumer Associations with Health, Safety, and Environment.

    Science.gov (United States)

    Sax, Joanna K; Doran, Neal

    2016-12-01

    The food supply is complicated and consumers are increasingly calling for labeling on food to be more informative. In particular, consumers are asking for the labeling of food derived from genetically modified organisms (GMO) based on health, safety, and environmental concerns. At issue is whether the labels that are sought would accurately provide the information desired. The present study examined consumer (n = 181) perceptions of health, safety and the environment for foods labeled organic, natural, fat free or low fat, GMO, or non-GMO. Findings indicated that respondents consistently believed that foods labeled GMO are less healthy, safe and environmentally-friendly compared to all other labels (ps labels mean something to consumers, but that a disconnect may exist between the meaning associated with the label and the scientific consensus for GMO food. These findings may provide insight for the development of labels that provide information that consumers seek.

  9. Radiation in the human environment: health effects, safety and acceptability

    International Nuclear Information System (INIS)

    Gonzalez, A.J.; Anderer, J.

    1990-01-01

    This paper reports selectively on three other aspects of radiation (used throughout to mean ionizing radiation) in the human environment: the human health effects of radiation, radiation safety policy and practices, and the acceptability of scientifically justified practices involving radiation exposures. Our argument is that the science of radiation biology, the judgemental techniques of radiation safety, and the social domain of radiation acceptability express different types of expertise that should complement - and not conflict with or substitute for - one another. Unfortunately, communication problems have arisen among these three communities and even between the various disciplines represented within a community. These problems have contributed greatly to the misperceptions many people have about radiation and which are frustrating a constructive dialogue on how radiation can be harnessed to benefit mankind. Our analysis seeks to assist those looking for a strategic perspective from which to reflect on their interaction with practices involving radiation exposures. (author)

  10. RESEARCH ON COMPLEX, LARGE INDUSTRIAL PROJECTS IN TRANSNATIONAL ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Florin POPESCU

    2016-12-01

    Full Text Available More and more projects from different industrial sectors developed in transnational environment are becoming more characterized as "complex". In recent years, there has been much discussion and controversy about the complexity of the projects, and, despite what has been written and said in various papers, journals and professional conferences, more confusion than clarification was created, complexity of projects being interpreted differently from one author to another. Most of the literature studied is based on linear, analytical and rational approach, focusing on the size of project management planning and control and actually less on projects that are characterized as taking place and grow into a dynamic socio-human environment in a continuous change. This study represents a critical review of existing theoretical models found in literature, highlighting their limitations. The output of this literature study represents an integration of different approaches concerning complexity under one umbrella to provide a common understanding of the evolution of this concept.

  11. The spin project: safety and performance indicators in different time frames

    International Nuclear Information System (INIS)

    Storck, R.; Becker, D.A.

    2002-01-01

    Safety and performance indicators have been under discussion for many years in several countries and international organisations. If those indicators refer to the long term safety of the total disposal system, they are often called safety indicators. If they refer to the performance of subsystems or the total system from a more technical point of view, they are sometimes called performance indicators. The need for indicators other than dose rates derives e.g. from the long time frames involved in safety assessments of waste disposal systems and the increasing uncertainty in dose rate calculations over time due to uncertainty in evolution of the surface environment and of behaviour of man. Before introducing additional indicators into a safety case of a potential repository site, the applicability and usefulness of different indicators have to be investigated and evaluated. The systematic analysis and testing of safety and performance indicators for use in different time horizons after closure of the disposal facility is the task of the SPIN project. This is done by re-calculating four recent studies concerning repository projects in granite formations. (authors)

  12. Environment report 1990 of the Federal Minister for the Environment, Nature Protection and Reactor Safety

    International Nuclear Information System (INIS)

    1990-01-01

    The 'Environment Report 1990' describes the environmental situation in the Federal Republic of Germany; draws a balance of environmental policy measures taken and introduced; gives information on future fields of action in environmental policy. The 'Environment Report 1990' also deals with the 'Environment Expert Opinion 1987', produced by the board of experts on environmental questions. It contains surveys of the following sectors: Protection against hazardous materials air pollution abatement, water management, waste management, nature protection and preservation of the countryside, soil conservation, noise abatement, radiation protection, reactor safety. A separate part of the 'Environment Report 1990' deals with the progress made in 'interdisciplinary fields' (general law on the protection of the environment, instruments of environmental policy, environmental information and environmental research, transfrontier environmental policy). (orig./HP) [de

  13. Pacific Northwest Laboratory: Annual report for 1986 to the Assistant Secretary for Environment, Safety and Health: Part 5, Nuclear and operational safety

    International Nuclear Information System (INIS)

    Faust, L.G.; Kennedy, W.E.; Steelman, B.L.; Selby, J.M.

    1987-02-01

    Part 5 of the 1986 Annual Report to the Department of Energy's Assistant Secretary for Environment, Safety and Health presents Pacific Northwest Laboratory's progress on work performed for the Office of Nuclear Safety, the Office of Operational Safety, and for the Office of Environmental Analysis. For each project, as identified by the Field Task Proposal/Agreement, articles describe progress made during fiscal year 1986. Authors of these articles represent a broad spectrum of capabilities derived from three of the seven research departments of the Laboratory, reflecting the interdisciplinary nature of the work

  14. The pursuit of health, safety and environment objectives

    International Nuclear Information System (INIS)

    Armstrong, K.

    1994-01-01

    The conference paper examines certain issues facing E and P companies with respect to health, safety and environment (HSE) management and costs. It reviews some of the pressures forcing companies to increase their HSE cost reductions. It discusses the critical role that risk management plays in efforts to resolve these competing pressures so as to best protect shareholder value, and it identifies some areas for potential improvement. Finally, it examines the contribution industry partnerships with government can make in promoting cost-effective HSE risk management. 8 refs

  15. The pursuit of health, safety and environment objectives

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, K [Chevron Overseas Petroleum, Inc. (United States)

    1994-12-31

    The conference paper examines certain issues facing E and P companies with respect to health, safety and environment (HSE) management and costs. It reviews some of the pressures forcing companies to increase their HSE cost reductions. It discusses the critical role that risk management plays in efforts to resolve these competing pressures so as to best protect shareholder value, and it identifies some areas for potential improvement. Finally, it examines the contribution industry partnerships with government can make in promoting cost-effective HSE risk management. 8 refs.

  16. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  17. Integrated model of port oil piping transportation system safety including operating environment threats

    OpenAIRE

    Kołowrocki, Krzysztof; Kuligowska, Ewa; Soszyńska-Budny, Joanna

    2017-01-01

    The paper presents an integrated general model of complex technical system, linking its multistate safety model and the model of its operation process including operating environment threats and considering variable at different operation states its safety structures and its components safety parameters. Under the assumption that the system has exponential safety function, the safety characteristics of the port oil piping transportation system are determined.

  18. Alberta Environment's weir safety program : options for rehabilitation to improve public safety : a case study of the Calgary weir

    Energy Technology Data Exchange (ETDEWEB)

    Blakely, D. [Alberta Environment, Edmonton, AB (Canada)

    2009-07-01

    Alberta Environment Water Management Operations (WMO) owns and operates 46 dams and 800 kilometres of canals in Alberta. The WMO consists of 120 staff and several contract operators to take care of this infrastructure. Most of the infrastructure supplies water for irrigation use, which adds 5 billion dollars to the provincial economy annually. Other water uses include stock watering, domestic use, municipal use, recreational use and habitat. Alberta Environment's weir safety program was also discussed along with options for rehabilitation to improve public safety. A case study of Calgary's Weir Dam on the Bow River was highlighted. A brief history of the dam was offered and safety programs around provincially-owned weirs were discussed. Photographs were included to illustrate some of the additional safety measures at the Calgary weir, such as suspended safety buoys upstream of the boom directing paddlers to the portage trail, and signage on the river that can be activated when the boom is out. Typical river users on the Calgary Bow River and safety history at the Calgary Weir were discussed along with other topics such as the Calgary Bow River weir project criteria; project design progress; pre-feasibility options; scale modelling; final design analysis; construction funding; and proposed changes to the safety program for the new weir configuration. figs.

  19. Environment, Safety and Health Progress Assessment of the Hanford Site

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety and Health (ES ampersand H) Progress Assessment of the Hanford Site, in Richland, Washington. The assessment, which was conducted from May 11 through May 22, 1992, included a selective-review of the ES ampersand H management systems and programs of the responsible DOE Headquarters Program Offices the DOE Richland Field Office, and the site contractors. The ES ampersand H Progress Assessments are part of the Secretary of Energy's continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. The purpose of the Hanford Site ES ampersand H Progress Assessment is to provide the Secretary with an independent assessment of the adequacy and effectiveness of the DOE and contractor management structures, resources, and systems to address ES ampersand H problems and requirements. They are not intended to be comprehensive compliance assessments of ES ampersand H activities. The point of reference for assessing programs at the Hanford Site was, for the most part, the Tiger Team Assessment of the Hanford Site, which was conducted from May 21 through July 18, 1990. A summary of issues and progress in the areas of environment, safety and health, and management is included

  20. Urban green spaces assessment approach to health, safety and environment

    Directory of Open Access Journals (Sweden)

    B. Akbari Neisiani

    2016-04-01

    Full Text Available The city is alive with dynamic systems, where parks and urban green spaces have high strategic importance which help to improve living conditions. Urban parks are used as visual landscape with so many benefits such as reducing stress, reducing air pollution and producing oxygen, creating opportunities for people to participate in physical activities, optimal environment for children and decreasing noise pollution. The importance of parks is such extent that are discussed as an indicator of urban development. Hereupon the design and maintenance of urban green spaces requires integrated management system based on international standards of health, safety and the environment. In this study, Nezami Ganjavi Park (District 6 of Tehran with the approach to integrated management systems have been analyzed. In order to identify the status of the park in terms of the requirements of the management system based on previous studies and all Tehran Municipality’s considerations, a check list has been prepared and completed by park survey and interview with green space experts. The results showed that the utility of health indicators were 92.33 % (the highest and environmental and safety indicators were 72 %, 84 % respectively. According to SWOT analysis in Nezami Ganjavi Park some of strength points are fire extinguishers, first aid box, annual testing of drinking water and important weakness is using unseparated trash bins also as an opportunities, there are some interesting factors for children and parents to spend free times. Finally, the most important threat is unsuitable park facilities for disabled.

  1. Kikori River basin project to sustain environment alongside development

    International Nuclear Information System (INIS)

    Price, J.B.; Power, A.P.; Henry, D.

    1994-01-01

    Protecting people and the environment is an essential design and operational criteria for the Kutubu Petroleum Development Project to minimize the physical, social and economic impacts on the local people and their environment in Papua New Guinea. This paper describes how Kutubu was implemented, and how World Wildlife Fund is assisting the neighboring communities to utilize their natural resources for long term benefit. The objectives and first year expectations of a three year integrated conservation and development project are identified, and the progress is summarized

  2. An approach to the relationship, environment-project-administration

    International Nuclear Information System (INIS)

    Angel Sanin, Enrique

    1999-01-01

    Interdisciplinary groups working in environmental management, have to deal with three different problems, understanding the regional environment in which the project will be implemented, estimating the environmental impacts and devising the environmental management plan (EMP). These three realities environment, project and management are loosely defined, their limits are not clear and, therefore, several things are mean by the same word. In this article, an attempt to express these three realities in a language with some mathematical rigor is presented, looking for precision in their meaning. Some pertinent conclusions regarding environmental management are derived from the mathematical attempt

  3. Process competencies in a problem and project based learning environment

    DEFF Research Database (Denmark)

    Du, Xiangyun; Kolmos, Anette

    2006-01-01

    with the expected professional competencies. Based on the educational practice of PBL Aalborg Model, which is characterized by problem-orientation, project-organization and team work, this paper examines the process of developing process competencies through studying engineering in a PBL environment from...... process competencies through doing problem and project based work in teams? 2) How do students perceive their achievement of these process competencies?......Future engineers are not only required to master technological competencies concerning solving problems, producing and innovating technology, they are also expected to have capabilities of cooperation, communication, and project management in diverse social context, which are referred to as process...

  4. Nuclear Criticality Technology and Safety Project parameter study database

    International Nuclear Information System (INIS)

    Toffer, H.; Erickson, D.G.; Samuel, T.J.; Pearson, J.S.

    1993-03-01

    A computerized, knowledge-screened, comprehensive database of the nuclear criticality safety documentation has been assembled as part of the Nuclear Criticality Technology and Safety (NCTS) Project. The database is focused on nuclear criticality parameter studies. The database has been computerized using dBASE III Plus and can be used on a personal computer or a workstation. More than 1300 documents have been reviewed by nuclear criticality specialists over the last 5 years to produce over 800 database entries. Nuclear criticality specialists will be able to access the database and retrieve information about topical parameter studies, authors, and chronology. The database places the accumulated knowledge in the nuclear criticality area over the last 50 years at the fingertips of a criticality analyst

  5. Assessment of Contributions to Patient Safety Knowledge by the Agency for Healthcare Research and Quality-Funded Patient Safety Projects

    Science.gov (United States)

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-01-01

    Objective To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)' patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Data Sources Information abstracted from proposals for projects funded in AHRQ' patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. Study Design This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. Principal Findings The 234 projects funded through AHRQ' patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. Conclusions The projects funded in AHRQ' patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results. PMID:21456108

  6. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  7. Effect of the Road Environment on Road Safety in Poland

    Science.gov (United States)

    Budzynski, Marcin; Jamroz, Kazimierz; Antoniuk, Marcin

    2017-10-01

    Run-off-road accidents tend to be very severe because when a vehicle leaves the road, it will often crash into a solid obstacle (tree, pole, supports, front wall of a culvert, barrier). A statistical analysis of the data shows that Poland’s main roadside hazard is trees and the severity of vehicles striking a tree in a run-off-road crash. The risks are particularly high in north-west Poland with many of the roads lined up with trees. Because of the existing rural road cross-sections, i.e. having trees directly on road edge followed immediately by drainage ditches, vulnerable road users are prevented from using shoulders and made to use the roadway. With no legal definition of the road safety zone in Polish regulations, attempts to remove roadside trees lead to major conflicts with environmental stakeholders. This is why a compromise should be sought between the safety of road users and protection of the natural environment and the aesthetics of the road experience. Rather than just cut the trees, other road safety measures should be used where possible to treat the hazardous spots by securing trees and obstacles and through speed management. Accidents that are directly related to the road environment fall into the following categories: hitting a tree, hitting a barrier, hitting a utility pole or sign, vehicle rollover on the shoulder, vehicle rollover on slopes or in ditch. The main consequence of a roadside hazard is not the likelihood of an accident itself but of its severity. Poland’s roadside accident severity is primarily the result of poor design or operation of road infrastructure. This comes as a consequence of a lack of regulations or poorly defined regulations and failure to comply with road safety standards. The new analytical model was designed as a combination of the different factors and one that will serve as a comprehensive model. It was assumed that it will describe the effect of the roadside on the number of accidents and their consequences

  8. Performance assessment and the safety case: Lessons from recent international projects and areas for further development

    International Nuclear Information System (INIS)

    Galson, Daniel A.; Bailey, Lucy

    2014-01-01

    The European Commission (EC) PAMINA project - Performance Assessment Methodologies in Application to Guide the Development of the Safety Case - was conducted over the period 2006-2009 and brought together 27 organisations from 10 countries. PAMINA had the aim of improving and developing a common understanding of performance assessment (PA) methodologies for disposal concepts for spent fuel and other long-lived radioactive wastes in a range of geological environments. This was followed by a Nuclear Energy Agency (NEA) sponsored project on Methods for Safety Assessment of Geological Disposal Facilities for Radioactive Waste (MeSA), which was completed in 2012. This paper presents a selection of conclusions from these projects, in the context of general understanding developed on what would constitute an acceptable safety case for a geological disposal facility, and outlines areas for further development. The paper also introduces a new project on PA that is under consideration within the context of the EC Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP). (authors)

  9. The SISIFO project: Seismic Safety at High Schools

    Science.gov (United States)

    Peruzza, Laura; Barnaba, Carla; Bragato, Pier Luigi; Dusi, Alberto; Grimaz, Stefano; Malisan, Petra; Saraò, Angela; Mucciarelli, Marco

    2014-05-01

    For many years, the Italian scientific community has faced the problem of the reduction of earthquake risk using innovative educational techniques. Recent earthquakes in Italy and around the world have clearly demonstrated that seismic codes alone are not able to guarantee an effective mitigation of risk. After the tragic events of San Giuliano di Puglia (2002), where an earthquake killed 26 school children, special attention was paid in Italy to the seismic safety of schools, but mainly with respect to structural aspects. Little attention has been devoted to the possible and even significant damage to non-structural elements (collapse of ceilings, tipping of cabinets and shelving, obstruction of escape routes, etc..). Students and teachers trained on these aspects may lead to a very effective preventive vigilance. Since 2002, the project EDURISK (www.edurisk.it) proposed educational tools and training programs for schools, at primary and middle levels. More recently, a nationwide campaign aimed to adults (www.iononrischio.it) was launched with the extensive support of civil protection volounteers. There was a gap for high schools, and Project SISIFO was designed to fill this void and in particular for those schools with technical/scientific curricula. SISIFO (https://sites.google.com/site/ogssisifo/) is a multidisciplinary initiative, aimed at the diffusion of scientific culture for achieving seismic safety in schools, replicable and can be structured in training the next several years. The students, helped by their teachers and by experts from scientific institutions, followed a course on specialized training on earthquake safety. The trial began in North-East Italy, with a combination of hands-on activities for the measurement of earthquakes with low-cost instruments and lectures with experts in various disciplines, accompanied by specifically designed teaching materials, both on paper and digital format. We intend to raise teachers and students knowledge of the

  10. Representation a Framwork for Contractors Selection Via of Health, Safety and Environment

    Directory of Open Access Journals (Sweden)

    Shahram Mahmoudi

    2016-12-01

    Full Text Available Introduction: Quality and efficiency of health, safety, and environment (HSE management systems play a vital role in achieving their goals. Considering outputs and objective achievement make continuous improvement of services and products, internal and external customer satisfaction, adopting a systematic way for performing various tasks, system performance and analysis very important. The present study was conducted to construct a proper framework for assessing MAPNA group contractors in terms of their health, safety, and environment performance.  . Method: In the first step of the study, all documents and literature associated with performance assessment were reviewed. In the second step, using a focus group approach, a basic model for assessing HSE management system was designed. Lastly, the framework was tested and credited on three major contractors of MAPNA group. Results: The proposed framework was composed of five criteria. The main criteria was the pattern of HSE process implementation which had seven sub-criteria and 120 guiding hints. Moreover, the five criteria were able to assess the organizational capabilities in terms of health, safety, and environment management.. Conclusion: The proposed framework make contractors able to promote their HSE performances by identifying organizational strong and weak points, prioritizing improvement projects, and also monitoring the pace of improvement in achieving organizational excellence..

  11. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  12. Human-Robot Teamwork in USAR Environments: The TRADR Project

    NARCIS (Netherlands)

    Greeff, J. de; Hindriks, K.; Neerincx, M.A.; Kruijff-Korbayova, I.

    2015-01-01

    The TRADR project aims at developing methods and models for human-robot teamwork, enabling robots to operate in search and rescue environments alongside humans as teammates, rather than as tools. Through a user-centered cognitive engineering method, human-robot teamwork is analyzed, modeled,

  13. CAMCE: An Environment to Support Multimedia Courseware Projects.

    Science.gov (United States)

    Barrese, R. M.; And Others

    1992-01-01

    Presents results of CAMCE (Computer-Aided Multimedia Courseware Engineering) project research concerned with definition of a methodology to describe a systematic approach for multimedia courseware development. Discussion covers the CAMCE methodology, requirements of an advanced authoring environment, use of an object-based model in the CAMCE…

  14. Occupational health and environment research 1983: Health, Safety, and Environment Division. Progress report

    International Nuclear Information System (INIS)

    Voelz, G.L.

    1985-05-01

    The primary responsibility of the Health, Safety, and Environment (HSE) Division at the Los Alamos National Laboratory is to provide comprehensive occupational health and safety programs, waste processing, and environmental protection. These activities are designed to protect the workers, the public, and the environment. Evaluation of respiratory protective equipment included the XM-30 and M17A1 military masks, use of MAG-1 spectacles in respirators, and eight self-contained units. The latter units were used in an evaluation of test procedures used for Bureau of Mines approval of breathing apparatuses. Analyses of air samples from field studies of a modified in situ oil shale retorting facility were performed for total cyclohexane extractables and selected polynuclear aromatic hydrocarbons. Aerosols generation and characterization of effluents from oil shale processing were continued as part of an inhalation toxicology study. Additional data on plutonium excretion in urine are presented and point up problems in using the Langham equation to predict plutonium deposition in the body from long-term excretion data. Environmental surveillance at Los Alamos during 1983 showed the highest estimated radiation dose from Laboratory operations to be about 26% of the natural background radiation dose. Several studies on radionuclides and their transport in the Los Alamos environment are described. The chemical quality of surface and ground water near the geothermal hot dry rock facility is described. Short- and long-term consequences to man from releases of radionuclides into the environment can be simulated by the BIOTRAN computer model, which is discussed brirfly

  15. Advanced Engineering Environment FY09/10 pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  16. Steam Pressure-Reducing Station Safety and Energy Efficiency Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Lower, Mark D [ORNL; Christopher, Timothy W [ORNL; Oland, C Barry [ORNL

    2011-06-01

    The Facilities and Operations (F&O) Directorate is sponsoring a continuous process improvement (CPI) program. Its purpose is to stimulate, promote, and sustain a culture of improvement throughout all levels of the organization. The CPI program ensures that a scientific and repeatable process exists for improving the delivery of F&O products and services in support of Oak Ridge National Laboratory (ORNL) Management Systems. Strategic objectives of the CPI program include achieving excellence in laboratory operations in the areas of safety, health, and the environment. Identifying and promoting opportunities for achieving the following critical outcomes are important business goals of the CPI program: improved safety performance; process focused on consumer needs; modern and secure campus; flexibility to respond to changing laboratory needs; bench strength for the future; and elimination of legacy issues. The Steam Pressure-Reducing Station (SPRS) Safety and Energy Efficiency Improvement Project, which is under the CPI program, focuses on maintaining and upgrading SPRSs that are part of the ORNL steam distribution network. This steam pipe network transports steam produced at the ORNL steam plant to many buildings in the main campus site. The SPRS Safety and Energy Efficiency Improvement Project promotes excellence in laboratory operations by (1) improving personnel safety, (2) decreasing fuel consumption through improved steam system energy efficiency, and (3) achieving compliance with applicable worker health and safety requirements. The SPRS Safety and Energy Efficiency Improvement Project being performed by F&O is helping ORNL improve both energy efficiency and worker safety by modifying, maintaining, and repairing SPRSs. Since work began in 2006, numerous energy-wasting steam leaks have been eliminated, heat losses from uninsulated steam pipe surfaces have been reduced, and deficient pressure retaining components have been replaced. These improvements helped ORNL

  17. Practice and innovation on safety management of Haiyang Nuclear Power Project

    International Nuclear Information System (INIS)

    Wei Guohu

    2011-01-01

    From the perspective of owner, this article has introduced the safety management model and practice of Haiyang Nuclear Power Project, one of AP1000 Self-reliance Program supporting projects of China. And the article has summarized characteristics of the safety management of Haiyang Project for reference and communication with nuclear or other projects. (author)

  18. Environment, safety and health, management and organization compliance assessment, West Valley Demonstration Program, West Valley, New York

    International Nuclear Information System (INIS)

    1989-08-01

    An Environment, Safety and Health ''Tiger Team'' Assessment was conducted at the West Valley Demonstration Project. The Tiger Team was chartered to conduct an onsite, independent assessment of WVDP's environment, safety and health (ES ampersand H) programs to assure compliance with applicable Federal and State laws, regulations, and standards, and Department of Energy Orders. The objective is to provide to the Secretary of Energy the following information: current ES ampersand H compliance status of each facility; specific noncompliance items; ''root causes'' for noncompliance items; evaluation of the adequacy of ES ampersand H organization and resources (DOE and contractor) and needed modifications; and where warranted, recommendations for addressing identified problem areas

  19. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    Energy Technology Data Exchange (ETDEWEB)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

  20. Studies on environment safety and application of advanced reactor for inland nuclear power plants

    International Nuclear Information System (INIS)

    Wei, L.; Jie, L.

    2014-01-01

    To study environment safety assessment of inland nuclear power plants (NPPs), the impact of environment safety under the normal operation was researched and the environment risk of serious accidents was analyzed. Moreover, the requirements and relevant provisions of site selection between international nuclear power plant and China's are comparatively studied. The conclusion was that the environment safety assessment of inland and coastal nuclear power plant have no essential difference; the advanced reactor can meet with high criteria of environment safety of inland nuclear power plants. In this way, China is safe and feasible to develop inland nuclear power plant. China's inland nuclear power plants will be as big market for advanced reactor. (author)

  1. Managing large energy and mineral resources (EMR) projects in challenging environments

    Science.gov (United States)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their

  2. Work environment and safety climate in the Swedish merchant fleet.

    Science.gov (United States)

    Forsell, Karl; Eriksson, Helena; Järvholm, Bengt; Lundh, Monica; Andersson, Eva; Nilsson, Ralph

    2017-02-01

    To get knowledge of the work environment for seafarers sailing under the Swedish flag, in terms of safety climate, ergonomical, chemical and psychosocial exposures, and the seafarers self-rated health and work ability. A Web-based questionnaire was sent to all seafarers with a personal e-mail address in the Swedish Maritime Registry (N = 5608). Comparisons were made mainly within the study population, using Student's t test, prevalence odds ratios and logistic regressions with 95% confidence intervals. The response rate was 35% (N = 1972; 10% women, 90% men), with 61% of the respondents working on deck, 31% in the engine room and 7% in the catering/service department (1% not classifiable). Strain on neck, arm or back and heavy lifting were associated with female gender (p = 0.0001) and younger age (below or above 30 years of age, p harassment or bullying during last year of service. Noise, risk of accidents, hand/arm and whole-body vibrations and psychosocial factors such as harassment were commonly reported work environment problems among seafarers within the Swedish merchant fleet.

  3. Safety in urban environment and emergency notice boards

    International Nuclear Information System (INIS)

    Confortini, Claudia; Tira, Maurizio

    2008-01-01

    Reliable and safe urban system conditions have to be a crucial goal of ordinary planning activities. Among planning goals, priority must be given to indications relating to the safety levels to be achieved and to the amount of resources to be directed towards reducing the vulnerability of urban systems and therefore of the measures to be taken. Uban vulnerability cannot in fact be reduced to the sum of the vulnerability of single buildings or to the physical vulnerability of its various components. This research work consists of identifying those urban sub-areas that are important for safety in relation to natural risks, ambits that should be highlighted by means of permanent emergency notice boards/billboards. What are the hazard notices relating to all natural hazards and related risks? Where are they located? Are they clear and straightforward so that all residents and visitors are able to understand them, as it is already the case for road signs (or at least it should be)? What urban sub-areas are worth highlighting in relation to natural risks, acting for example as escape routes or meeting points? How is information for the public managed in order that people are immediately, easily and regularly notified? What is the relation of such signals to ordinary traffic signals? Research into the state of the art of permanent notice boards/billboards of this type, currently distinguished only by sporadic and local initiatives, aims at carrying out a census of and recognizing urban elements already considered as important for reducing the vulnerability of the urban system to different natural calamities and at providing new highlights as regards the identification of new ones. The next step is to work out a decision and common-language strategy for planning these elements and for their adequate signposting, so as to be able to live in the urban environment with awareness, safety and confidence, including with respect to more remote and therefore often neglected

  4. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  5. Towards a Collaborative Open Environment of Project-Centred Learning

    DEFF Research Database (Denmark)

    Bongio, Aldo; van Bruggen, Jan; Ceri, Stefano

    Nowadays, engineering studies are characterized by high mobility of students, lecturers and workforce and by the dynamics of multinational companies where “classes” or “students’ teams” composed of persons with different competencies and backgrounds, working together in projects to solve complex ...... environment. This paper proposes a COOPER framework and shows its approaches to address the various research challenges. This work is partially supported by EU/IST FP6 STREP project COOPER (contract number IST-2005-027073).......Nowadays, engineering studies are characterized by high mobility of students, lecturers and workforce and by the dynamics of multinational companies where “classes” or “students’ teams” composed of persons with different competencies and backgrounds, working together in projects to solve complex...

  6. Human Activity Recognition in AAL Environments Using Random Projections

    Directory of Open Access Journals (Sweden)

    Robertas Damaševičius

    2016-01-01

    Full Text Available Automatic human activity recognition systems aim to capture the state of the user and its environment by exploiting heterogeneous sensors attached to the subject’s body and permit continuous monitoring of numerous physiological signals reflecting the state of human actions. Successful identification of human activities can be immensely useful in healthcare applications for Ambient Assisted Living (AAL, for automatic and intelligent activity monitoring systems developed for elderly and disabled people. In this paper, we propose the method for activity recognition and subject identification based on random projections from high-dimensional feature space to low-dimensional projection space, where the classes are separated using the Jaccard distance between probability density functions of projected data. Two HAR domain tasks are considered: activity identification and subject identification. The experimental results using the proposed method with Human Activity Dataset (HAD data are presented.

  7. Human Activity Recognition in AAL Environments Using Random Projections.

    Science.gov (United States)

    Damaševičius, Robertas; Vasiljevas, Mindaugas; Šalkevičius, Justas; Woźniak, Marcin

    2016-01-01

    Automatic human activity recognition systems aim to capture the state of the user and its environment by exploiting heterogeneous sensors attached to the subject's body and permit continuous monitoring of numerous physiological signals reflecting the state of human actions. Successful identification of human activities can be immensely useful in healthcare applications for Ambient Assisted Living (AAL), for automatic and intelligent activity monitoring systems developed for elderly and disabled people. In this paper, we propose the method for activity recognition and subject identification based on random projections from high-dimensional feature space to low-dimensional projection space, where the classes are separated using the Jaccard distance between probability density functions of projected data. Two HAR domain tasks are considered: activity identification and subject identification. The experimental results using the proposed method with Human Activity Dataset (HAD) data are presented.

  8. 25 CFR 170.144 - What are eligible highway safety projects?

    Science.gov (United States)

    2010-04-01

    ... RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions... management system; (g) Education and outreach highway safety programs, such as use of child safety seats... 25 Indians 1 2010-04-01 2010-04-01 false What are eligible highway safety projects? 170.144...

  9. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  10. Integrated model of port oil piping transportation system safety including operating environment threats

    Directory of Open Access Journals (Sweden)

    Kołowrocki Krzysztof

    2017-06-01

    Full Text Available The paper presents an integrated general model of complex technical system, linking its multistate safety model and the model of its operation process including operating environment threats and considering variable at different operation states its safety structures and its components safety parameters. Under the assumption that the system has exponential safety function, the safety characteristics of the port oil piping transportation system are determined.

  11. The ALIVE Project: Astronomy Learning in Immersive Virtual Environments

    Science.gov (United States)

    Yu, K. C.; Sahami, K.; Denn, G.

    2008-06-01

    The Astronomy Learning in Immersive Virtual Environments (ALIVE) project seeks to discover learning modes and optimal teaching strategies using immersive virtual environments (VEs). VEs are computer-generated, three-dimensional environments that can be navigated to provide multiple perspectives. Immersive VEs provide the additional benefit of surrounding a viewer with the simulated reality. ALIVE evaluates the incorporation of an interactive, real-time ``virtual universe'' into formal college astronomy education. In the experiment, pre-course, post-course, and curriculum tests will be used to determine the efficacy of immersive visualizations presented in a digital planetarium versus the same visual simulations in the non-immersive setting of a normal classroom, as well as a control case using traditional classroom multimedia. To normalize for inter-instructor variability, each ALIVE instructor will teach at least one of each class in each of the three test groups.

  12. Ferrocyanide Safety Project: Subtask 3.4, Aging Studies

    International Nuclear Information System (INIS)

    Lilga, M.A.; Lumetta, M.R.; Riemath, W.F.; Romine, R.A.; Schiefelbein, G.F.

    1992-11-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in single-shell waste storage tanks (SSTs), in particular the storage of waste in a safe manner. This Task Team, composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), and outside consultants, was formed in response to the need for an updated analysis of safety questions about the Hanford ferrocyanide tanks. This annual report gives the results of the work conducted by PNL in FY 1992 on Subtask 3.4, Aging Studies, which is part of Task 3, Chemical Nature of Feffocyanide in Wastes. Subtask 3.4 deals with the aging behavior and solubilization of ferrocyanide tank waste sludges in a basic aqueous environment. Investigated were the effects of pH variation, ionic strength, salts present in SSTS, and gamma radiation on solubilization of vendor-prepared Na 2 NiFe(CN) 6

  13. A series of student design projects for improving and modernizing safety helmets

    NARCIS (Netherlands)

    Beurden, van K.M.M. (Karin); Boer, de J. (Johannes); Stilma, M. (Margot); Teeuw, W.B. (Wouter)

    2014-01-01

    The Saxion Research Centre for Design and Technology employs many students during research projects. This paper discusses a series of student design projects on safety helmets in the Safety@Work project. At construction sites workers are required to wear personal protective equipment during their

  14. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    Science.gov (United States)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  15. Exploring the Influence of Nurse Work Environment and Patient Safety Culture on Attitudes Toward Incident Reporting.

    Science.gov (United States)

    Yoo, Moon Sook; Kim, Kyoung Ja

    2017-09-01

    The aim of this study was to explore the influence of nurse work environments and patient safety culture on attitudes toward incident reporting. Patient safety culture had been known as a factor of incident reporting by nurses. Positive work environment could be an important influencing factor for the safety behavior of nurses. A cross-sectional survey design was used. The structured questionnaire was administered to 191 nurses working at a tertiary university hospital in South Korea. Nurses' perception of work environment and patient safety culture were positively correlated with attitudes toward incident reporting. A regression model with clinical career, work area and nurse work environment, and patient safety culture against attitudes toward incident reporting was statistically significant. The model explained approximately 50.7% of attitudes toward incident reporting. Improving nurses' attitudes toward incident reporting can be achieved with a broad approach that includes improvements in work environment and patient safety culture.

  16. Safety equipment list for the 241-SY-101 RAPID mitigation project

    International Nuclear Information System (INIS)

    Morris, K.L.

    1999-01-01

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein

  17. Safety equipment list for the 241-SY-101 RAPID mitigation project

    Energy Technology Data Exchange (ETDEWEB)

    MORRIS, K.L.

    1999-06-29

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein.

  18. Taking ownership of safety. What are the active ingredients of safety coaching and how do they impact safety outcomes in critical offshore working environments?

    Science.gov (United States)

    Krauesslar, Victoria; Avery, Rachel E; Passmore, Jonathan

    2015-01-01

    Safety coaching interventions have become a common feature in the safety critical offshore working environments of the North Sea. Whilst the beneficial impact of coaching as an organizational tool has been evidenced, there remains a question specifically over the use of safety coaching and its impact on behavioural change and producing safe working practices. A series of 24 semi-structured interviews were conducted with three groups of experts in the offshore industry: safety coaches, offshore managers and HSE directors. Using a thematic analysis approach, several significant themes were identified across the three expert groups including connecting with and creating safety ownership in the individual, personal significance and humanisation, ingraining safety and assessing and measuring a safety coach's competence. Results suggest clear utility of safety coaching when applied by safety coaches with appropriate coach training and understanding of safety issues in an offshore environment. The current work has found that the use of safety coaching in the safety critical offshore oil and gas industry is a powerful tool in managing and promoting a culture of safety and care.

  19. Seismic safety margins research program. Project I SONGS 1 AFWS Project

    International Nuclear Information System (INIS)

    Chuang, T.Y.; Smith, P.D.; Dong, R.G.; Bernreuter, D.L.; Bohn, M.P.; Cummings, G.E.; Wells, J.E.

    1981-01-01

    The seismic qualification requirements of auxiliary feedwater systems (AFWS) of Pressurized Water Reactors (PWR) were developed over a number of years. These are formalized in the publication General Design Criteria (Appendix A to 10CFR50). The full recognition of the system as an engineered safety feature did not occur until publication of the Standard Review Plan (1975). Efforts to determine how to backfit seismic requirements to earlier plants has been undertaken primarily in the Systematic Evaluation Program (SEP) for a limited number of operating reactors. Nuclear Reactor Research (RES) and NRR have requested LLNL to perform a probabilistic study on the AFWS of San Onofre Nuclear Generating Station (SONGS) Unit 1 utilizing the tools developed by the Seismic Safety Margins Research Program (SSMRP). The main objectives of this project are to: identify the weak links of AFWS; compare the failure probabilities of SONGS 1 and Zion 1 AFWS: and compare the seismic responses due to different input spectra and design values

  20. AREVA advanced safety IC solutions and licensing experience for new nuclear builds and modernization projects - 15545

    International Nuclear Information System (INIS)

    Fourestie, B.; Pickelmann, J.; Richter, S.; Hilsenkopf, P.; Paris, P.

    2015-01-01

    Regulatory requirements for the Instrumentation and Control (IC) for Nuclear Power Plants have become significantly more stringent during the last 10 years in the areas of software development and qualification, traceability, diversity, or seismic requirements for instance, and with the introduction of new standards (such as the IEC 62566, or the IEC 62003). Based on a large and comprehensive experience gained from projects in several regulatory environments and different plant types (including non-OEM plants), AREVA has developed and adapted its processes and products to provide state-of-the-art IC solutions in full compliance with the regulatory demands and requirements in terms of robustness (independence, defense-in-depth, diversity and cyber-security). In this paper we present the safety IC platforms developed by AREVA. These platforms include TELEPERM XS as the computerized safety IC platform for class 1 system implementation, the Qualified Display System (QDS) for safety classified screen-based interface, and UNICORN as fully diverse analog safety IC platform for backup systems

  1. CONSTRUCTION PROJECTS VERSUS THE PROTECTION OF NATURE AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Elżbieta Hanna Szafranko

    2017-02-01

    Full Text Available Construction investments are related to the economic development of each country. Expansion of towns and settlements, construction, industrial, commercial and recreational objects and the communication network is necessary and results from regional development strategies. For their implementation it is necessary to prepare the area designated for their development. In many regions of our country area suitable for construction are increasingly limited, and furthermore investors often looks for an attractive investment location. For this reason, more and more construction projects dangerously close to areas of high natural value and protected and often are entering the these areas. To minimize the negative investment impact on the environment there are developed several variants of investment. Next, assessing the positive and negative effects, we choose the best, from the point of view of the surrounding environment solution. To illustrate the procedure example of analysis using the method proposed by the author, the indicator is shown.

  2. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  3. Proceeding of Radiation Safety and Environment; Prosiding Presentasi Ilmiah Keselamatan Radiasi dan Lingkungan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Scientific Presentation of Radiation Safety and Environment was held on 20-21 august 1996 at Center of Research Atomic Energy Pasar Jum'at, Jakarta, Indonesia. Have presented 50 papers about Radiation Safety, dosimetry and standardization, environment protection and radiation effect.

  4. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  5. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    Risk Engineering Ltd is a Bulgarian private company founded in 1990 to provide engineering and consulting services applicable to each and every field of the energy sector. Since its establishment Risk Engineering Ltd develops, implement and apply a System for quality assurance, certified for the first time by BVQI (now Bureau Veritas Certification) in 1999 for conformity with the standard ISO 9001:1994. Later on, in connection with the revision of the standards of ISO 9000 series and introduction of the standard ISO 9001:2000 a Quality Management System in conformity with the standard ISO 9001:2000 was developed, introduced and certified. At present, Risk Engineering Ltd has got developed, documented, introduced and certified by Lloyd's Register Quality Assurance (LRQA) Quality Management System in compliance with ISO 9001:2008 on the process approach basis. On this basis and including the requirements of the ISO 14001:2004 (regarding the environment) and OHSAS 18001:2007 (regarding the health and occupational safety), Risk Engineering Ltd has developed and introduced Integrated Management System aim at achieving and demonstrating good results regarding protection of the environment, health and occupational safety. The processes under control by the Integrated Management System and applicable at the company are divided in two general types: A) Management processes: Strategic management and Management of the human resources. B) Processes describing the main activities: design/development process; project management; management of industrial projects and technical infrastructure project; construction, installation, repair and operation of power industry facilities; commercial activities and marketing; investigation of energy efficiency of industrial systems and certification of buildings regarding energy efficiency; consulting activity in the field of industry and energy as well as consultant in accordance with the Law of the Spatial Planning; management of the

  6. Equipment Qualification and Environment Establishment for COTS Dedication of Safety Grade PC

    International Nuclear Information System (INIS)

    Ahn, Kwang Chul; Bin, Chang Sun; Kwon, Yoon Kwang; Kang, Shin Woo; Koh, Sung Won; Shon, Eui Chan; Jang, Hyun Doo; Song, Il Sup; Lee, Hyun Noh

    2010-08-01

    Safety grade PCs are required for protection systems of SKN 3 and 4 nuclear power plant and subsequent plants. Commercial grade item (CGI) dedication should be carried out to utilize a commercial PC as a safety grade PC of nuclear power plants. This project is aimed to perform the equipment qualification of the commercial PC, and review and improve the quality system of the PC supplier. As a result of the EQ for the CGI dedication, selected military PCs have passed the environment test, the seismic test, and the EMI test required for the digital controllers of nuclear plants. In addition, a walk-through of the quality system of the PC supplier, ISO 9001, was carried out and the quality system was improved. History data for the PC was gathered. As the analysis of the history data showed that operating experience time of the PC is longer than the plant life time, the history data could be used as an evidence of acceptance. After dedicated according to the CGI dedication process, military rugged PCs could be used for safety grade PCs

  7. Effects of ventilated safety helmets in a hot environment

    Science.gov (United States)

    G.A. Davis; E.D. Edmisten; R.E. Thomas; R.B. Rummer; D.D. Pascoe

    2001-01-01

    Forest workers are likely to remove head protection in hot and humid conditions because of thermal discomfort. However, a recent Occupational Safety and Health Administration (OSHA) regulation revision requires all workers in logging operations to wear safety helmets, thus creating a compliance problem. To determine which factors contribute to forest workers’ thermal...

  8. ENVIRONMENT PROTECTION AND ENVIRONMENT MONITORING ISSUES IN THE PROJECTS OF SUBGLACIAL LAKES STUDIES IN ANTARCTICA

    Directory of Open Access Journals (Sweden)

    I. A. Alekhina

    2012-01-01

    Full Text Available Antarctic subglacial lakes can represent extreme natural habitats for microorganisms from the position of their evolution and adaptation, as well as they can contain the information on Antarctic ice sheet history and climatic changes in their sediments. Now only direct measurements and sampling from these habitats can answer on many fundamental questions. Special precaution should be complied at penetration into these unique relic environments without unfavorable impacts and contamination. A number of recommendations were developed on levels of cleanliness and sterility during direct exploration and research of subglacial environments. Documents considered in the article are the first and necessary steps for appropriate and long-term ecological management of subglacial Antarctic environments. Today there are three projects of subglacial aquatic environment research which are in preparation and realization – the Russian project of Lake Vostok, the similar British project of Lake Ellsworth and the American project on Whillans Ice Stream. The programs of ecological stewardship for direct exploration of these lakes are discussed. All these subglacial aquatic objects of further exploration and research are so various on their structure, age and regime, that only results of all programs as a whole can help to draw us a uniform picture of a subglacial ecological system. Ecological stewardship of these should provide the minimal ecological impact with maximal scientific results. On the basis of existing documents and recommendations the general approaches and the program of ecological stewardship for Lake Vostok research are discussed. Study of drilling fluid, drilling chips, Vostok ice core and the fresh frozen water will allow to make an assessment of biological and chemical contamination as a result of the first penetration and to modify the further stewardship program for the second penetration and direct exploration of lake water.

  9. Nuclear criticality safety program for environmental restoration projects

    International Nuclear Information System (INIS)

    Marble, R.C.; Brown, T.D.

    1994-05-01

    The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center (FMPC), is located on a 1050 acre site approximately twenty miles northwest of Cincinnati, Ohio. The production area of the site covers approximately 136 acres in the central portion of the site. Surrounding the core production area is a buffer consisting of leased grazing land, reforested land, and unused areas. The uranium processing facility was designed and constructed in the early 1950s. During the period from 1952 to 1989 the site produced uranium feed material and uranium products used in the United States weapons complex. Production at the site ended in 1989, when the site was shut down for what was expected to be a short period of time. However, the FUTC was permanently shut down in 1991, and the site's mission was changed from production to environmental restoration. The objective of this paper is to give an update on activities at the Fernald Site and to describe the Nuclear Criticality Safety issues that are currently being addressed

  10. Dryout modeling in support of the organic tank safety project

    International Nuclear Information System (INIS)

    Simmons, C.S.

    1998-08-01

    This work was performed for the Organic Tank Safety Project to evaluate the moisture condition of the waste surface organic-nitrate bearing tanks that are classified as being conditionally safe because sufficient water is present. This report describes the predictive modeling procedure used to predict the moisture content of waste in the future, after it has been subjected to dryout caused by water vapor loss through passive ventilation. This report describes a simplified procedure for modeling the drying out of tank waste. Dryout occurs as moisture evaporates from the waste into the headspace and then exits the tank through ventilation. The water vapor concentration within the waste of the headspace is determined by the vapor-liquid equilibrium, which depends on the waste's moisture content and temperature. This equilibrium has been measured experimentally for a variety of waste samples and is described by a curve called the water vapor partial pressure isotherm. This curve describes the lowering of the partial pressure of water vapor in equilibrium with the waste relative to pure water due to the waste's chemical composition and hygroscopic nature. Saltcake and sludge are described by two distinct calculations that emphasize the particular physical behavior or each. A simple, steady-state model is devised for each type to obtain the approximate drying behavior. The report shows the application of the model to Tanks AX-102, C-104, and U-105

  11. Reports covering research projects in the field of reactor safety supported by the German Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1976-03-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the safety program 'Reactor Safety' are sponsored by the Bundesminister fuer Forschung und Technologie (BMFT - Secretary of State for Research and Technology). Objective of this program is to continue improving the safety of LWR, in order to minimize the risk for the environment. With grant assistance from the Bundesminister des Innern. (BMI - Secretary of State for Home Affairs) research cont racts in the field of reactor safety are being performed. Results of these projects should contribute to resolve questions arising nuclear licensing procedures. The Forschungsbetreuung (FB - research supervision department) at the Institute for Reactor Safety (IRS), as consultants to BMFT and BMI, provides information about the progress of investigations. Individual reports will be prepared and put into standard forms by the research contractors. Each report gives information on: 1) the work accomplished, 2) the results obtained, 3) the work planned to be continued. Initial reports of research projects describe in addition the purpose of the work. A BMFT-research program on the safety of Fast Breeders (Schneller Brutreaktor - SBR) is presently under discussion. In order to define several problems, investigations included in the present compilation (RS 139, 140, 143, 162) will be previously performed. (orig.) [de

  12. Reports on the research projects in the field of reactor safety sponsored by the Federal Ministry of Science and Technology

    International Nuclear Information System (INIS)

    1975-12-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the safety program 'Reactor Safety' are sponsored by the Bundesminister fuer Forschung und Technologie (BMFT - Secretary of State for Research and Technology). Objective of this program is to continue improving the safety of LWR, in order to minimize the risk for the environment. With grant assistance from the Bundesminister des Innern (BMI - Secretary of State for Home Affairs) research contracts in the field of reactor safety are being performed. Results of these projects should contribute to resolve questions arising nuclear licensing procedures. The Forschungsbetreuung (FB - research supervision department) at the Institute for Reactor Safety (IRS), as consultants to BMFT and BMI, provides information about the progress of investigations. Individual reports will be prepared and put into standard forms by the research contractors. Each report gives information on: 1) the work accomplished, 2) the results obtained, 3) the work planned to be continued. Initial reports of research projects describe in addition the purpose of the work. A BMFT-research program on the safety of Fast Breeders (Schneller Brutreaktor - SBR) is presently under discussion. In order to define several problems, investigations included in the present compilation (RS 139, 140, 143, 162) will be previously performed. (orig.) [de

  13. Reports on the research projects in the field of reactor safety sponsored by the Federal Ministry of Science and Technology

    International Nuclear Information System (INIS)

    1976-12-01

    Investigations on the safety of light water reactors (LWR) being performed in the framework of the safety program 'Reactor Safety' are sponsored by the Bundesminister fuer Forschung und Technologie (BMFT - Secretary of State for Research and Technology). Objective of this program is to continue improving the safety of LWR, in order to minimize the risk for the environment. With grant assistance from the Bundesminister des Innern (BMI - Secretary of State for Home Affairs) research contrcts in the field of reactor safety are being performed. Results of these projects should contribute to resolve questions arising nuclear licensing procedures. The Forschungsbetreuung (FB - research supervision department) at the Institute for Reactor Safety (IRS), as consultants to BMFT and BMI, provides information about the progress of investigations. Individual reports will be prepared and put into standard forms by the research contractors. Each report gives information on: 1) the work accomplished, 2) the results obtained, 3) the work planned to be continued. Initial reports of research projects describe in addition the purpose of the work. A BMFT-research program on the safety of Fast Breeders (Schneller Brutreaktor - SRB) is presently under discussion. In order to define several problems, investigations included in the present compilation (RS 139, 140, 143, 162) will be previously performed. (orig.) [de

  14. Safety cases for the co-ordinated research project on improvement of safety assessment methodologies for near surface radioactive waste disposal facilities (ISAM)

    International Nuclear Information System (INIS)

    Kozak, M.W.; Torres-Vidal, C.; Kelly, E.; Guskov, A.; Blerk, J. van

    2002-01-01

    A Co-ordinated Research Project (CRP) has recently been completed on the Improvement of Safety Assessment Methodologies for Near-Surface Radioactive Waste Disposal Facilities (ISAM). A major aspect of the project was the use of safety cases for the practical application of safety assessment. An overview of the ISAM safety cases is given in this paper. (author)

  15. RAAK PRO project: measuring safety in aviation : concept for the design of new metrics

    NARCIS (Netherlands)

    Karanikas, Nektarios; Kaspers, Steffen; Roelen, Alfred; Piric, Selma; van Aalst, Robbert; de Boer, Robert

    2017-01-01

    Following the completion of the 1st phase of the RAAK PRO project Aviation Safety Metrics, during which the researchers mapped the current practice in safety metrics and explored the validity of monotonic relationships of SMS, activity and demographic metrics with safety outcomes, this report

  16. Organizational culture and a safety-conscious work environment: The mediating role of employee communication satisfaction.

    Science.gov (United States)

    Silla, Inmaculada; Navajas, Joaquin; Koves, G Kenneth

    2017-06-01

    A safety-conscious work environment allows high-reliability organizations to be proactive regarding safety and enables employees to feel free to report any concern without fear of retaliation. Currently, research on the antecedents to safety-conscious work environments is scarce. Structural equation modeling was applied to test the mediating role of employee communication satisfaction in the relationship between constructive culture and a safety-conscious work environment in several nuclear power plants. Employee communication satisfaction partially mediated the positive relationships between a constructive culture and a safety-conscious work environment. Constructive cultures in which cooperation, supportive relationships, individual growth and high performance are encouraged facilitate the establishment of a safety-conscious work environment. This influence is partially explained by increased employee communication satisfaction. Constructive cultures should be encouraged within organizations. In addition, managers should promote communication policies and practices that support a safety-conscious work environment. Copyright © 2017 Elsevier Ltd and National Safety Council. All rights reserved.

  17. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  18. General safety orientations of the Jules Horowitz Reactor Project (JHRP)

    International Nuclear Information System (INIS)

    Tremodeux, P.; Fiorini, G.L.

    2000-01-01

    After a brief reminder of the JHR purpose, the document outlines the General Safety related Orientations/Recommendations used for the design and the safety assessment of the facility. As far as the JHR design is new, the safety philosophy adopted for this reactor will be as consistent as possible with that recommended for future (power...) reactors. The general recommendations developed in the paper are: the general nuclear safety approach for the design, operation and analysis with, in particular, the adoption of the Defence In Depth principle; the general safety objectives in terms of radiological consequences; the use of Probabilistic Safety Studies; quality assurance. The 'Defence in Depth' concept using amongst others the 'Barrier' principle remains the basis of the JHR safety. 'Defence In Depth' is applied both to design and operation. Its adequacy is checked during the safety assessment and the paper gives the technical recommendations that should allow the designer to implement this concept into the final design. Built mainly for experimental irradiation the JHR facilities will be handled according to conventional or new operation rules which could put materials under stress and entail handling errors. Specific recommendations are defined to take into account the corresponding peculiarities; they are discussed in the paper. The safety design of the JHR takes into account the experience accumulated through the CEA experimental irradiation programmes, which represents several dozen reactor years; the consultation of CEA reactor facilities operators is ongoing. The corresponding feedback is shortly described. Recommendations related to maintenance and associated operation are indicated as well as those regarding the human factor. Details are given on the JHR safety practical implementation through the CEA/DRN Safety approach. Details of the corresponding Safety Objectives are also discussed. Finally the designer position on the role of probabilistic safety

  19. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  20. Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Alderson, E.V.; Hallen, R.T.

    1995-09-01

    This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na 2 NiFe(CN) 6 , and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na 2 NiFe(CN) 6 in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH) 2 and soluble Na 4 Fe(CN) 6 . The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly

  1. Relational approach in managing construction project safety: a social capital perspective.

    Science.gov (United States)

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

    International Nuclear Information System (INIS)

    GERBER MS

    2007-01-01

    This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site

  3. SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    GERBER MS

    2007-12-05

    This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site.

  4. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    International Nuclear Information System (INIS)

    CARTER, R.P.

    1999-01-01

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective

  5. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  6. Evaluating the Clinical Learning Environment: Resident and Fellow Perceptions of Patient Safety Culture.

    Science.gov (United States)

    Bump, Gregory M; Calabria, Jaclyn; Gosman, Gabriella; Eckart, Catherine; Metro, David G; Jasti, Harish; McCausland, Julie B; Itri, Jason N; Patel, Rita M; Buchert, Andrew

    2015-03-01

    The Accreditation Council for Graduate Medical Education has begun to evaluate teaching institutions' learning environments with Clinical Learning Environment Review visits, including trainee involvement in institutions' patient safety and quality improvement efforts. We sought to address the dearth of metrics that assess trainee patient safety perceptions of the clinical environment. Using the Hospital Survey on Patient Safety Culture (HSOPSC), we measured resident and fellow perceptions of patient safety culture in 50 graduate medical education programs at 10 hospitals within an integrated health system. As institution-specific physician scores were not available, resident and fellow scores on the HSOPSC were compared with national data from 29 162 practicing providers at 543 hospitals. Of the 1337 residents and fellows surveyed, 955 (71.4%) responded. Compared with national practicing providers, trainees had lower perceptions of patient safety culture in 6 of 12 domains, including teamwork within units, organizational learning, management support for patient safety, overall perceptions of patient safety, feedback and communication about error, and communication openness. Higher perceptions were observed for manager/supervisor actions promoting patient safety and for staffing. Perceptions equaled national norms in 4 domains. Perceptions of patient safety culture did not improve with advancing postgraduate year. Trainees in a large integrated health system have variable perceptions of patient safety culture, as compared with national norms for some practicing providers. Administration of the HSOPSC was feasible and acceptable to trainees, and may be used to track perceptions over time.

  7. Developing a Highway Safety Fundamentals Course : Research Project Capsule

    Science.gov (United States)

    2012-10-01

    Although the need for road : safety education was fi rst : recognized in the 1960s, : recently it has become an : increasingly urgent issue. To : fulfi ll the hefty goal set up by : the AASHTO Highway : Safety Strategy (cutting : traffi c fatalities ...

  8. Safety evaluation report. Fast Flux Test Facility. Project No. 448

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    Information on the safety of the FFTF Reactor is presented under the following chapter headings: site characteristics; design of structures, components, equipment, and systems; reactor; reactor coolant system and connected systems; engineered safety features; electric power; auxiliary systems; radioactive waste management systems; radiation protection; conduct of operations; initial test programs; accident analysis; and quality assurance.

  9. Safety evaluation report. Fast Flux Test Facility. Project No. 448

    International Nuclear Information System (INIS)

    1978-01-01

    Information on the safety of the FFTF Reactor is presented under the following chapter headings: site characteristics; design of structures, components, equipment, and systems; reactor; reactor coolant system and connected systems; engineered safety features; electric power; auxiliary systems; radioactive waste management systems; radiation protection; conduct of operations; initial test programs; accident analysis; and quality assurance

  10. Environment, Health and Safety (EH&S): Division Liaisons

    Science.gov (United States)

    . Israel Tadesse Chemical Sciences x4043 Cell: 610-0856 Maram Kassis Electronic waste (E-waste) pickup or Source Representative 2231, 2014 Scott E. Taylor Chemical Safety Subcommittee Chairperson 4103 Hendrik Representative 7457 Stephen M. Franaszek Genomics Representative 925-296-5807 Vera Potapenko Marcia Ocon Leimer

  11. DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    This volume contains the appendices that provide additional environment, safety, and health (ES and H) information to complement Volume 1 of this Standard. Appendix A provides a set of candidate DOE ES and H directives and external regulations, organized by hazard types that may be used to identify potentially applicable directives to a specific facility disposition activity. Appendix B offers examples and lessons learned that illustrate implementation of ES and H approaches discussed in Section 3 of Volume 1. Appendix C contains ISMS performance expectations to guide a project team in developing and implementing an effective ISMS and in developing specific performance criteria for use in facility disposition. Appendix D provides guidance for identifying potential Applicable or Relevant and Appropriate Requirements (ARARs) when decommissioning facilities fall under the Comprehensive Environmental Response, Compensation, Liability Act (CERCLA) process. Appendix E discusses ES and H considerations for dispositioning facilities by privatization. Appendix F is an overview of the WSS process. Appendix G provides a copy of two DOE Office of Nuclear Safety Policy and Standards memoranda that form the bases for some of the guidance discussed within the Standard. Appendix H gives information on available hazard analysis techniques and references. Appendix I provides a supplemental discussion to Sections 3.3.4, Hazard Baseline Documentation, and 3.3.6, Environmental Permits. Appendix J presents a sample readiness evaluation checklist.

  12. DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1998-05-01

    This volume contains the appendices that provide additional environment, safety, and health (ES and H) information to complement Volume 1 of this Standard. Appendix A provides a set of candidate DOE ES and H directives and external regulations, organized by hazard types that may be used to identify potentially applicable directives to a specific facility disposition activity. Appendix B offers examples and lessons learned that illustrate implementation of ES and H approaches discussed in Section 3 of Volume 1. Appendix C contains ISMS performance expectations to guide a project team in developing and implementing an effective ISMS and in developing specific performance criteria for use in facility disposition. Appendix D provides guidance for identifying potential Applicable or Relevant and Appropriate Requirements (ARARs) when decommissioning facilities fall under the Comprehensive Environmental Response, Compensation, Liability Act (CERCLA) process. Appendix E discusses ES and H considerations for dispositioning facilities by privatization. Appendix F is an overview of the WSS process. Appendix G provides a copy of two DOE Office of Nuclear Safety Policy and Standards memoranda that form the bases for some of the guidance discussed within the Standard. Appendix H gives information on available hazard analysis techniques and references. Appendix I provides a supplemental discussion to Sections 3.3.4, Hazard Baseline Documentation, and 3.3.6, Environmental Permits. Appendix J presents a sample readiness evaluation checklist

  13. A study on development strategy of atomic safety organization for atomic environment

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sung Bok; Jeong, Ji Hun; Kim Tae Hee; Lee, Seung Hyuk; Woo, Eun Jung [Konkuk Univ., Seoul (Korea, Republic of)

    2005-02-15

    The objective of this research is to suggest some strategies which can make the safety of atomic power possible and reinforce the nuclear regulatory system. It will contribute to the expansion and settlement of nuclear safety culture by making the public understand well about the safety of nuclear energy, and searching public relations and incentive strategies. In addition, since the nuclear environment is changing rapidly, the necessity of cooperation between the public and the private has veen mostly required. So we need to develop the effective administrative system based on their cooperation. Therefore, it will examine the function of organization established, operation system, and also social network closely connected with the nuclear safety. Moreover, by analyzing the change of regulatory environment and present safety confirmation of nuclear energy, it will devise the new safety confirmation system of nuclear energy.

  14. Experience of Hungarian model project: 'Strengthening training for operational safety at Paks NPP'

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    Training of Operational Safety at Paks NPP is described including all the features of the project including namely: description of Paks NPP, its properties and performances; reasons for establishing Hungarian Model Project, its main goals, mentioning Hungarian and IAEA experts involved in the Project, its organization, operation, budget, current status together with its short term and long term impact

  15. Safety research in the field of energy production. Plan for continued Nordic projects

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstroem, P E [Statens Vattenfallsverk, Stockholm (Sweden); Berg, J [Institutt for Atomenergi, Kjeller (Norway); Eckered, T [Statens Kaernkraftinspektion, Stockholm (Sweden)

    1980-01-01

    NGS, an ad hoc group of the Nordic Co-ordination Committee for Atomic Energy, has prepared this survey of proposed cooperative projects as a continuation of previous projects. New areas to be given priority are:- reactor safety, environmental effects in energy production and human reliability. Continued projects are:- quality assurance, radioactive waste and radioecology. (JIW)

  16. Patterns of patient safety culture: a complexity and arts-informed project of knowledge translation.

    Science.gov (United States)

    Mitchell, Gail J; Tregunno, Deborah; Gray, Julia; Ginsberg, Liane

    2011-01-01

    The purpose of this paper is to describe patterns of patient safety culture that emerged from an innovative collaboration among health services researchers and fine arts colleagues. The group engaged in an arts-informed knowledge translation project to produce a dramatic expression of patient safety culture research for inclusion in a symposium. Scholars have called for a deeper understanding of the complex interrelationships among structure, process and outcomes relating to patient safety. Four patterns of patient safety culture--blinding familiarity, unyielding determination, illusion of control and dismissive urgency--are described with respect to how they informed creation of an arts-informed project for knowledge translation.

  17. Introduction to good practice in health, environment and safety management in enterprises

    NARCIS (Netherlands)

    Baranski, B.; Zwetsloot, G.

    2000-01-01

    Purpose of this paper, presented on the fifth annual meeting of the Baltic Sea Network on Occupational Health and Safety (Berlin, 18-19 November 1999), is to outline conceptual models of good practice (GP) in Health, Environment and Safety Management in Enterprises (HESME), present major components

  18. Learning Safety Assessment from Accidents in a University Environment

    OpenAIRE

    Jensen, Niels; Jørgensen, Sten Bay

    2013-01-01

    This contribution describes how a chemical engineering department started learning from accidents during experimental work and ended up implementing an industrially inspired system for risk assessment of new and existing experimental setups as well as a system for assessing potential risk from the chemicals used in the experimental work. These experiences have led to recent developments which focus increasingly on the a theoretical basis for modeling and reasoning on safety as well as operati...

  19. Analysis of Aviation Safety Reporting System Incident Data Associated With the Technical Challenges of the Vehicle Systems Safety Technology Project

    Science.gov (United States)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This analysis was conducted to support the Vehicle Systems Safety Technology (VSST) Project of the Aviation Safety Program (AVsP) milestone VSST4.2.1.01, "Identification of VSST-Related Trends." In particular, this is a review of incident data from the NASA Aviation Safety Reporting System (ASRS). The following three VSST-related technical challenges (TCs) were the focus of the incidents searched in the ASRS database: (1) Vechicle health assurance, (2) Effective crew-system interactions and decisions in all conditions; and (3) Aircraft loss of control prevention, mitigation, and recovery.

  20. Environment Health & Safety Research Program. Organization and 1979-1980 Publications

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    This document was prepared to assist readers in understanding the organization of Pacific Northwest Laboratory, and the organization and functions of the Environment, Health and Safety Research Program Office. Telephone numbers of the principal management staff are provided. Also included is a list of 1979 and 1980 publications reporting on work performed in the Environment, Health and Safety Research Program, as well as a list of papers submitted for publication.

  1. EC-funded project (HTR-L) for the definition of a European safety approach for HTR's

    International Nuclear Information System (INIS)

    Ehster, S.; Dominguez, M.T.; Coe, I.; Brinkmann, G.; Lensa, W. von; Mheen, W. van der; Alessandroni, C.; Pirson, J.

    2002-01-01

    The inherent safety features of the HTRs make events leading to severe core damage highly unlikely and constitute the main differentiating aspects compared to LWRs. While a known and stable regulatory environment has long been established for Light Water Reactors, a different approach is necessary for the licensing of HTR based power plants. Among the R and D projects funded by the European Commission for HTR reactors, the HTR-L project is dedicated to the definition of a common and coherent European safety approach and the identification of the main licensing issues for the licensing framework of the Modular HTRs. Other specific objectives of this project are : To develop a methodology to classify the accidental conditions; To define the preliminary requirements for the confinement of radioactive products and to assess the need for a 'conventional' containment structure; To establish a SSC (2) classification and to define the rules for equipment qualification; To identify the key issues that need to be addressed in the licensing process of the HTRs; To organize a workshop with the concerned Safety Authorities at the end of the project. This paper will explain the project objectives and its final expected outcomes. (author)

  2. does road safety projects relate to community capacity building?

    African Journals Online (AJOL)

    USER

    The AARSI organization is currently based in Lagos State and its mission is to ... organizational structures, resources and commitments to health promotion, .... donated breathalyzer equipment worth of $90,000 to Road Safety Personnel as at.

  3. DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 1 of 2: Technical standard

    International Nuclear Information System (INIS)

    1998-05-01

    This Department of Energy (DOE) technical standard (referred to as the Standard) provides guidance for integrating and enhancing worker, public, and environmental protection during facility disposition activities. It provides environment, safety, and health (ES and H) guidance to supplement the project management requirements and associated guidelines contained within DOE O 430.1A, Life-Cycle Asset Management (LCAM), and amplified within the corresponding implementation guides. In addition, the Standard is designed to support an Integrated Safety Management System (ISMS), consistent with the guiding principles and core functions contained in DOE P 450.4, Safety Management System Policy, and discussed in DOE G 450.4-1, Integrated Safety Management System Guide. The ISMS guiding principles represent the fundamental policies that guide the safe accomplishment of work and include: (1) line management responsibility for safety; (2) clear roles and responsibilities; (3) competence commensurate with responsibilities; (4) balanced priorities; (5) identification of safety standards and requirements; (6) hazard controls tailored to work being performed; and (7) operations authorization. This Standard specifically addresses the implementation of the above ISMS principles four through seven, as applied to facility disposition activities

  4. Track 2: business outlook and the significance of safety - safety of nuclear power reactor installations in a deregulated environment. Panel Discussion

    International Nuclear Information System (INIS)

    Schultz, Stephen P.; Floyd, Stephen; Berkow, Herbert N.; Quinn, Edward L.; Hagen, Ronald E.; Esselman, Thomas C.

    2001-01-01

    Full text of publication follows: Deregulation in the nuclear industry sets the stage for a new production environment with cost and profit-based competition. This not only affects the commercial reactor sector but also is a key element of the U.S. Department of Energy's (DoE's) strategy for facility deployment and commercialization. This panel is designed to explore how these transitions are being made with the assurance of the principle of safety in operations. Panelists have been assembled from industry, the U.S. Nuclear Regulatory Commission (NRC), and DOE to explore these challenges and opportunities in the deregulated operational environment from a variety of perspectives. Presentations by each panelist will be followed by a panel session that will explore both technical and process elements of these major transitions. Success in a deregulated environment requires both safety and economic operation of facilities. With respect to each of these attributes, competition may be expected to result in substantially higher levels of performance. This panel will examine how these expectations are likely to be set, how they will be measured, and what will constitute success. The baseline for evaluation begins with assessment of past performance. The panelists have examined this for both the commercial nuclear reactor sector, as well as for the DOE complex. The Nuclear Energy Institute and the NRC have been working over the past few years on a program to establish new performance indicators for monitoring safety of reactor operation. The session participants will first examine the effectiveness of this system as it is designed to measure performance in today's environment. Second, the panelists will project the capabilities and attributes of this system in monitoring safety in transition to a deregulated, consolidated market. Will these systems have the capability to identify trends that will be significant in this new environment? Will today's system and metrics be

  5. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    Science.gov (United States)

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  6. Pilot research on a pupil’s psychological safety in the multicultural educational environment

    Directory of Open Access Journals (Sweden)

    Kulikova, Tatyana I.

    2016-09-01

    Full Text Available In the modern world, the environment of any educational institution represents a spectrum of ethnic groups and subcultures: a multicultural educational environment. Pupils who are aware of their national identity often demonstrate intolerance toward students of other nationalities, which threatens pupils’ psychological safety. In this article, we present the results of pilot research examining the level of a pupil’s psychological safety in the multicultural educational environment and identifying the criteria that influence a pupil’s psychological safety. The research sample comprised 127 pupils aged 13–14 years from different schools living in various places that differed by the type of settlement, industrial development and level of science and culture. We isolated the following criteria for a pupil’s psychological safety in the multicultural educational environment: satisfaction with the educational environment, protection from psychological abuse and self-confidence. According to pupils, the essential characteristics of safety in the educational environment, regardless of school category and type, are being able to ask for help, protection of personal dignity, interactions with other students, and self-respect. Empirical data reveal the current status of the psychological safety of the entire sample group (n = 127 and compare indices of psychological safety in the educational institutions under study. Analysis of the results of our research indicates that protecting a pupil’s personality in the multicultural educational environment has the greatest influence on his/her psychological safety. In addition, a comfortable psychological atmosphere, mutual aid and support of pupils and low levels of classmates’ and coevals’ aggression positively influence the protection experience.

  7. Learning Safety Assessment from Accidents in a University Environment

    DEFF Research Database (Denmark)

    Jensen, Niels; Jørgensen, Sten Bay

    2013-01-01

    This contribution describes how a chemical engineering department started learning from accidents during experimental work and ended up implementing an industrially inspired system for risk assessment of new and existing experimental setups as well as a system for assessing potential risk from...... the chemicals used in the experimental work. These experiences have led to recent developments which focus increasingly on the a theoretical basis for modeling and reasoning on safety as well as operational aspects within a common framework. Presently this framework is being extended with barrier concepts both...

  8. Promoting safety in the work environment: the role of internal marketing

    OpenAIRE

    2009-01-01

    M.Comm. The process of creating a safe working environment for all has proved to be one of the most complex facets within an organisation. This may be attributed to the fact that there are so many elements involved in ensuring occupational safety. Not only has the individual employee a responsibility towards safety, including his or her attitude and risk-taking behaviour, but also does the organisation contribute towards this hazard-free environment in providing a culture where safety is r...

  9. Integrating environment, safety and health training at a national laboratory

    International Nuclear Information System (INIS)

    Larson, D.R.

    1993-01-01

    In a multi-purpose research laboratory, innovation and creativity are required to satisfy the training requirements for hazards to people and the environment. A climate that encourages excellence in research and enhances hazard minimization skills is created by combining technical expertise with instructional design talent

  10. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  11. West Virginia Peer Exchange : Streamlining Highway Safety Improvement Program Project Delivery - An RSPCB Peer Exchange

    Science.gov (United States)

    2014-09-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September 23 to 24, 2014 in Charleston, West V...

  12. The NPPR Trnava participation in the NPP V-2 modernisation and safety improvement project

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    1999-01-01

    The presented contribution deals with form, present state and results of Nuclear Power Plants Research Inst.e participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project.(author)

  13. Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment. Research project

    International Nuclear Information System (INIS)

    Martorell, S.; Serradell, V.; Munoz, A.; Sanchez, A.

    1997-01-01

    Background, objective, scope, detailed working plan and follow-up and final product of the project ''Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment'' are described

  14. West Virginia peer exchange : streamlining highway safety improvement program project delivery.

    Science.gov (United States)

    2015-01-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...

  15. Radiation effects on man health, environment, safety, security. Global Chernobyl mapping

    International Nuclear Information System (INIS)

    Bebeshko, V.; Bazyka, D.; Volovik, S.; Loganovsky, K.; Sushko, V.; Siedow, J.; Cohen, H.; Ginsburg, G.; Chao, N.; Chute, J.

    2007-01-01

    Complete text of publication follows. Objectives: Ionizing radiation is a primordial terrestrial and extraterrestrial background and archetypal environmental stress-factor for life origin, evolution, and existence. We all live in radiation world inevitably involving nuclear energy production, nuclear weapon, nuclear navy, radioactive waste, pertinent medical diagnostics and treatment, etc with connected certain probability of relevant accidents and terrorist attack, space and jet travels, high natural background radiation, etc - actual and potential sources of radiation exposures and effects. State-of- the art integral fundamental research on radiation effects on man health, environment, safety, and security (REMHESS) is nowadays paramount necessity and challenge. Methods and results: In given generalized conceptual framework unique 20 years Chernobyl multidimensional research and databases for radiation effects on man's all organism systems represent invaluable original basis and resources for mapping Chernobyl data and REMHESS challenge. Granted by DOE brand new Chernobyl Research and Service Project based on 'Sarcophagus-II' (Object 'Shelter') workers only one in radiation history baseline cohort, corresponding biorepository prospective dynamic data, integrated conceptual database system, and 'state of the art' 'omics' (genomics, proteomics, metabolomics) analysis is designed specifically for coherent addressing global REMHESS problems. In this connection 'Sarcophagus-II' is only one unique universal model. Conclusions: The fundamental goals of novel strategic Project and global Chernobyl mapping are to determine specific 'omics' signatures of radiation for man depending of exposure peculiarity to understand ultimate molecular mechanisms of radiation effects, gene environment interactions, etiology of organisms systems disorders and diseases, and to develop new biomarkers and countermeasures to protect man health in the framework of global REMHESS challenge

  16. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  17. Safety and health in the Canadian mine environment

    International Nuclear Information System (INIS)

    Grenier, M.G.; Hardcastle, S.G.

    1990-01-01

    CANMET's Mining Research Laboratories (MRL) in Elliot Lake and Bell's Corners, Ontario, with the cooperation of the mining industry, have contributed to improving environmental conditions in underground and surface mining and milling operations. The extent of collaboration and efforts vary widely from long-term, multi-million dollar projects between several interested parties to smaller projects involving one laboratory and a single mining operation. This paper gives examples of such collaborative efforts and potential future directions as they apply to mine ventilation analysis using tracer gas techniques, optimization of mine ventilation network efficiency using real-time monitoring and controlled recirculation (heat saving), respirable dust and radiation sampling and control techniques, diesel emission control using regenerative ceramic filters and, the control of sulphide dust explosions and resulting sulphur dioxide production. (27 refs., 6 tabs., 3 figs.)

  18. Nursing practice environment, job outcomes and safety climate: a structural equation modelling analysis.

    Science.gov (United States)

    Dos Santos Alves, Daniela Fernanda; da Silva, Dirceu; de Brito Guirardello, Edinêis

    2017-01-01

    To assess correlations between the characteristics of the nursing practice environment, job outcomes and safety climate. The nursing practice environment is critical to the well-being of professionals and to patient safety, as highlighted by national and international studies; however, there is a lack of evidence regarding this theme in paediatric units. A cross-sectional study, in two paediatric hospitals in Brazil, was conducted from December 2013 to February 2014. For data collection, we used the Nursing Work Index - Revised, Safety Attitudes Questionnaire - Short Form 2006 and the Maslach Burnout Inventory, and for analysis Spearman's correlation coefficient and structural equation modelling were used. Two hundred and sixty-seven professional nurses participated in the study. Autonomy, control over the work environment and the relationship between nursing and medical staff are factors associated with job outcomes and safety climate and can be considered their predictors. Professional nurses with greater autonomy, good working relationships and control over their work environment have lower levels of emotional exhaustion, higher job satisfaction, less intention of leaving the job and the safety climate is positive. Initiatives to improve the professional practice environment can improve the safety of paediatric patients and the well-being of professional nurses. © 2016 John Wiley & Sons Ltd.

  19. A Program Applying Professional Safety Basics in Construction Projects

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-04-01

    Full Text Available When industrial and constructional renaissance started in the world, the great interest was going on towards the equipment’s, which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry. The professional safety is concerned as restrict which aims to take care of humanitarian and material principles also to raise the production of these principles, in the aspect of safety, health and providing the suitable healthy condition to the worker so he can feel safety, confidence and sociological settle, this will increase the production. So In order to maintain the manpower of business risks and to enable them to fulfill their role better to increase production and improve the quality and maintain the machine and supporting the national economy and keep pace with industrial developments and technological came the idea of research to focus on the importance of studying the subject of occupational safety by conducting a field survey to see the reality of professional safety in the relevant departments and work sites and through a questionnaire on the subject and conduct personal interviews with those concerned in this area and to prepare a program for the application of professional safety for each resource (labor, machines, materials, money in construction sites and departments concerned.

  20. Alberta Environment's weir safety program : options for rehabilitation to improve public safety : a case study of the Calgary weir

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Alberta Environment's water management operations (WMO) own and operates 46 dams and 800 km of canals. This presentation discussed a rehabilitation program designed to improve the safety of the WMO's Calgary weir which was built in 1908 to encourage settlement in the province. The weir includes a 32 m wide sluiceway, a 2.5 m concrete weir, and a fish ladder. A portage trail has been built to accommodate canoes, and signs are posted to indicate the hazards associated with the weir. The WMO has also launched an advertising campaign to outline hazards to the general public. The WMO has a contract with the Calgary fire department (CFD) to maintain a safety boom and provide rescue operations at the weir. The weir project aims to accommodate access and safety while enhancing flood conveyance capabilities of the weir. The project will allow upstream passage for patrol boats operated by the Calgary fire department's aquatic rescue service. The final design of the weir will include a series of drops constructed downstream of the weir to create pool and riffle structures that will eliminate hydraulic rollers. Notches will be cut in the weir to regulate flows moving through the new low and high flow channels. Case studies of other low-head dams operated by the WMO were also presented. tabs., figs.

  1. Preliminary safety evaluation for the spent nuclear fuel project`s cold vacuum drying system

    Energy Technology Data Exchange (ETDEWEB)

    Garvin, L.J., Westinghouse Hanford

    1996-07-01

    This preliminary safety evaluation (PSE) considers only the Cold Vacuum Drying System (CVDS) facility and its mission as it relates to the integrated process strategy (WHC 1995). The purpose of the PSE is to identify those CBDS design functions that may require safety- class and safety-significant accident prevention and mitigation features.

  2. 77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Science.gov (United States)

    2012-10-17

    ..., Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may.... The Captain of the Port, Sector Lake Michigan, has determined that this demolition project will pose a...

  3. 77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Science.gov (United States)

    2012-11-27

    ... environmental risk to health or risk to safety that may disproportionately affect children. 10. Indian Tribal... the Cline Avenue bridge in East Chicago, IN. The Captain of the Port, Sector Lake Michigan, has determined that this demolition project will pose a significant risk to public safety and property. Such...

  4. Legacy data sharing to improve drug safety assessment: the eTOX project

    DEFF Research Database (Denmark)

    Sanz, Ferran; Pognan, François; Steger-Hartmann, Thomas

    2017-01-01

    The sharing of legacy preclinical safety data among pharmaceutical companies and its integration with other information sources offers unprecedented opportunities to improve the early assessment of drug safety. Here, we discuss the experience of the eTOX project, which was established through...

  5. Investigating and improving pedestrian safety in an urban environment.

    Science.gov (United States)

    Pollack, Keshia M; Gielen, Andrea C; Mohd Ismail, Mohd Nasir; Mitzner, Molly; Wu, Michael; Links, Jonathan M

    2014-12-01

    Prompted by a series of fatal and nonfatal pedestrian-vehicle collisions, university leadership from one urban institution collaborated with its academic injury research center to investigate traffic-related hazards facing pedestrians. This descriptive epidemiologic study used multiple data collection strategies to determine the burden of pedestrian injury in the target area. Data were collected in 2011 through a review of university crash reports from campus police; a systematic environmental audit and direct observations using a validated instrument and trained raters; and focus groups with faculty, students, and staff. Study findings were synthesized and evidence-informed recommendations were developed and disseminated to university leadership. Crash reports provided some indication of the risks on the streets adjacent to the campus. The environmental audit identified a lack of signage posting the speed limit, faded crosswalks, issues with traffic light and walk sign synchronization, and limited formal pedestrian crossings, which led to jaywalking. Focus groups participants described dangerous locations and times, signal controls and signage, enforcement of traffic laws, use of cell phones and iPods, and awareness of pedestrian safety. Recommendations to improve pedestrian safety were developed in accordance with the three E's of injury prevention (education, enforcement, and engineering), and along with plans for implementation and evaluation, were presented to university leadership. These results underscore the importance of using multiple methods to understand fully the problem, developing pragmatic recommendations that align with the three E's of injury prevention, and collaborating with leadership who have the authority to implement recommended injury countermeasures. These lessons are relevant for the many colleges and universities in urban settings where a majority of travel to offices, classrooms, and surrounding amenities are by foot.

  6. Reports on the research projects in the field of reactor safety supported by the Federal Ministry of Research and Technology

    International Nuclear Information System (INIS)

    1975-03-01

    The Bundesminister fuer Forschung und Technologie (BMFT) is promoting financial plans for reactor safety research. Objective research should improve the safety of light water reactors and minimize the risk for the environment. The Forschungsbetreuung at IRS (IRS-FB) as consultants to the BMFT provides information about the research planning. In addition, information is given about the projects RS 100 and At T 85a sponsored by the Bundesminister des Innern (BMI). Individual reports will be furnished and put into standard form by the research contractors. Each report gives informations about: the work accomplished, the results produced, the outlook extension of the work. The initial report of a research project describes in addition the purpose of the work. Reports of the project 'Nuclear Safety' (PNS) have been added to those ones concerning the projects sponsored by the BMFT or the BMI. The PNS is being conducted by the Gesellschaft fuer Kernforschung mbH (GfK), Karlsruhe. IRS-F-23 is informing of the activities during the fourth quarter of 1974 (October 1st - December 31st 1974). Detailed technical information can be requested from IRS-FB. (orig.) [de

  7. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  8. European community light water reactor safety research projects. Experimental issue

    International Nuclear Information System (INIS)

    1975-01-01

    Research programs on light water reactor safety currently carried out in the European Community are presented. They cover: accident conditions (LOCA, ECCS, core meltdown, external influences, etc...), fault and accident prevention and means of mitigation, normal operation conditions, on and off site implications and equipment under severe accident conditions, and miscellaneous subjects

  9. Nuclear emergency preparedness. Final report of the Nordic Nuclear Safety Research Project BOK-1

    DEFF Research Database (Denmark)

    Lauritzen, B.

    2002-01-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, “Nuclear Emergency Preparedness”, was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects:Laboratory measurements and quality assurance (BOK-1.......1); Mobile measurements and measurement strategies (BOK-1.2); Field measurements and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in theNordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project...

  10. A PERSPECTIVE ON PRIORITIZATION IN PROJECT PORTFOLIO ENVIRONMENT

    OpenAIRE

    Eberhardt, Henrik; Lindblom, David

    2011-01-01

    The overbridging aspect of this interpretative master thesis is the implementation of a project prioritizing strategy. The concept is subdivided into three processes and entities, which could be seen as tools; project management office(PMO), project evaluation and project selection, which in turn are discussed separately. The thesis investigates how the tools impact the prioritizing strategy and why a company must follow a certain prioritizing strategy. The primary focus has been an IS/IT dep...

  11. Dark Matter in Galaxy Clusters: Shape, Projection, and Environment

    Science.gov (United States)

    Groener, Austen M.

    is highly variable depending upon the reconstruction technique used. We also find concentrations derived from dark matter only simulations (at approximately Mvir ˜ 1014 M[special characters omitted]) to be inconsistent with the WL and WL+SL relations at the 1sigma level, even after the projection of triaxial halos is taken into account. However, to fully determine consistency between simulations and observations, a volume-limited sample of clusters is required, as selection effects become increasingly more important in answering this. Interestingly, we also find evidence for a steeper WL+SL relation as compared to WL alone, a result which could perhaps be caused by the varying shape of cluster isodensities, though most likely reflects differences in selection effects caused by these two techniques. Lastly, we compare concentration and mass measurements of individual clusters made using more than one technique, highlighting the magnitude of the potential bias which could exist in such observational samples. Finally, we explore the large-scale environment around galaxy clusters using spectroscopically confirmed galaxies from the Sloan Digital Sky Survey (SDSS) Data Release 10. We correlate the angular structure of the distribution of galaxies (out to a distance of $mathrm{10h-1, Mpc) around 92 galaxy clusters with their corresponding mass and concentration measurements. We find that the orientation of the cluster environment on this scale has little impact on the value of cluster measurements.

  12. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  13. Project of a binary breeder reactor and its inherent safety

    International Nuclear Information System (INIS)

    Nascimento, J.A. do; Dias, A.F.; Ishiguro, Y.

    1983-01-01

    A core layout for the binary breeder reactor (BBR) is developed based on the results of preliminary burnup calculations. In the U 233 /TH fueled inner core, the apparent breeding ratio is low due to the accumulation of Pa-233 in the first few months of operation. The loss of reactivity during this time is approximatelly 3%. The BBR requires more reactivity control than Pu/U-fueled LMFBRs and the core layout developed has 19 control rod assemblies in the inner core. Three aspects related to the inherent safety of the BBR have been studied: radial distribution of the sodium-void reactivity, zone-wise Doppler reactivity, and the delayed neutron fractions. Results show excellent safety characteristics of the BBR. (Author) [pt

  14. EDF Contribution to the Mochovce completion and safety upgrading project

    International Nuclear Information System (INIS)

    Norvez, G.

    1997-01-01

    The challenge that SE a.s. took up in April 1996 to start Mochovce units 1 and 2 within a very demanding time frame and in satisfactory conditions is on the way to being wined. EMO managed to put in place an organisation able to ensure the continuity of the design and construction works and to integrate the requirements of modern safety. EDF is proud and happy to contribute to this effort by making available its expertise and experience in building and operating nuclear power plants. The success of Mochovce will not only contribute to the Slovak electricity needs coverage, but will be the first demonstration of a soviet design nuclear power plant brought to international safety standards. (author)

  15. Project of a binary breeder reactor and its inherent safety

    International Nuclear Information System (INIS)

    Nascimento, J.A. do; Dias, A.F.; Ishiguro, Y.

    1983-01-01

    A core layout for the binary breeder reactor (BBR) is developed based on the results of preliminary burnup calculations. The apparent breeding ratio, in the U 233 /Th fueled inner core, is low due to the accumulation of Pa-233 in the first few months of operation. The loss of reactivity during this time is around 3%. The BBR requires more reactivity control than Pu/U-fueled LMFBRs and the core layout developed has 19 control rod assemblies in the inner core. Three aspects related to the inherent safety of the Binary Breeder Reactor have been studied: the radial distribution of the sodium-void reactivity zone-wise Doppler reactivity and the fractions of delayed neutrons. The results show excellent characteristics for the BRB safety. (Author) [pt

  16. Probabilistic safety assessment of Narora Atomic Power Project

    International Nuclear Information System (INIS)

    Babar, A.K.; Saraf, R.K.; Kakodkar, A.; Sanyasi Rao, V.V.S.

    1989-01-01

    Various safety studies on Pressurised Water and Boiling Water reactors have been conducted. However, a detailed report on probabilistic safety assessment (PSA) of PHWRs is not available. PSA level I results of the standardised 235 MWe PHWR under construction at Narora are presented herein. Fault Tree analysis of various initiating events (IEs), safety systems has been completed. Event Tree analysis has been performed for all the dominating IEs to identify the accident sequences and a list of the dominating accident sequences is included. Analysis has been carried out using Monte Carlo simulation to propagate the uncertanities in failure rate data. Further uncertainty analysis is extended to obtain distributions for the accident sequences and core damage frequency. Some noteworthy results of the study apart from the various design modifications incorporated during the design phase are: (i) The accident sequences resulting from station blackout are dominant contributors to the core damage frequency. (ii) Class-IV transients, small break LOCA are significant IEs. Main steam line break is likely to induce steam generator tube ruptures. (iii) Moderator circulation, fire fighting system, secondary steam relief are relatively important in core damage frequency reductions. (iv) Under accidental situations human errors are likely to be asociated with valving in shutdown cooling and fire fighting systems. (author). 14 tabs., 14 figs., 15 refs

  17. Laser programs facility management plan for environment, safety, and health

    International Nuclear Information System (INIS)

    Cruz, G.E.

    1996-01-01

    The Lawrence Livermore National Laboratory's (LLNL) Laser Programs ES ampersand H policy is established by the Associate Director for Laser Programs. This FMP is one component of that policy. Laser Programs personnel design, construct and operate research and development equipment located in various Livermore and Site 300 buildings. The Programs include a variety of activities, primarily laser research and development, inertial confinement fusion, isotope separation, and an increasing emphasis on materials processing, imaging systems, and signal analysis. This FMP is a formal statement of responsibilities and controls to assure operational activities are conducted without harm to employees, the general public, or the environment. This plan identifies the hazards associated with operating a large research and development facility and is a vehicle to control and mitigate those hazards. Hazards include, but are not limited to: laser beams, hazardous and radioactive materials, criticality, ionizing radiation or x rays, high-voltage electrical equipment, chemicals, and powered machinery

  18. The National Program for Occupational Safety and Health in Agriculture. 1992 Project Facts.

    Science.gov (United States)

    National Inst. for Occupational Safety and Health (DHHS/PHS), Cincinnati, OH.

    This book contains information about a project instituted in 1990 by the National Institute for Occupational Safety and Health (NIOSH) to prevent work-related diseases and injuries among agricultural workers. Included are facts about 25 projects within NIOSH and 42 cooperative agreements between NIOSH and institutions in 25 states. These…

  19. Study of Evaluation OSH Management System Policy Based On Safety Culture Dimensions in Construction Project

    Science.gov (United States)

    Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko

    2017-07-01

    Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.

  20. No 2943. Project of law relative to nuclear transparency and safety

    International Nuclear Information System (INIS)

    2006-03-01

    This project of law comprises 5 titles dealing with: 1 - general dispositions: definition and scope of nuclear safety, security, radiation protection, operators liability, facilities in concern; 2 - the high nuclear safety authority: role and duties; 3 - public information in the domain of nuclear safety and radiation protection: information right of the public, local information commissions, high committee for nuclear safety transparency and information; 4 - basic nuclear facilities and transport of radioactive materials: applicable rules, police controls and measures, penal dispositions (investigations, sanctions); 5 - miscellaneous dispositions: changes made with respect to previous legislative texts. (J.S.)

  1. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 970.5223-1 Section 970.5223-1 Federal Acquisition... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  2. Project management competency factors in the built environment

    OpenAIRE

    2013-01-01

    M.Comm. (Business Management) Project failures worldwide are still significantly high, despite the availability of project management frameworks, standards, techniques and methodologies. A project’s success is, in part, contingent on effectively managing the constraints of time, costs and performance, and in order to achieve this, it is essential for the project manager to possess and display appropriate competencies. The problem addressed in this study is to gain understanding of the proj...

  3. THE QUALITY IMPORTANCE IN A PROJECT MANAGEMENT COMPLEXITY ENVIRONMENT

    OpenAIRE

    Adrian UNGUREANU; Anca VARGA

    2009-01-01

    A project is a temporary endeaver undertaken to creat a unique product, service or result. The temporary nature of project indicates a definite beginning and end. The end is reached when the project’s objectives have been achieved or when the project is terminated becouse its objectives will not or cannot be met, when the need for the project no longer exist. Temporary does not necessarily mean short in duration. Temporary does not generally apply to the product, service, or result created by...

  4. Procedures for initiation, cost-sharing and management of OECD projects in nuclear safety

    International Nuclear Information System (INIS)

    2002-01-01

    The OECD (CSNI) projects aim to produce results relevant for the safe operation of nuclear power plants through international collaborative projects. In general, the projects consist of advanced experimental programmes that are conducted at specialized facilities. At present, the following OECD (CSNI) projects are in operation: - The Halden Project, covering fuel/materials and I and C/Human Factors issues; - The Cabri Project, addressing reactivity transients on high burnup fuels; - The MASCA Project, which deals with in-vessel corium phenomena; - The OLHF Project, dealing with lower head failure mechanisms; - The SETH Project addressing thermal-hydraulics issues, started in 2001; - The MCCI Project on ex-vessel coolability and melt-concrete interaction. There are significant differences among these projects in terms of their motivation, size and scope. The Halden Project and the Cabri Water Loop Project are large undertakings where the host organisations assume full and direct responsibility for the project establishment and administration - as well as for the negotiation with relevant parties on the terms of participation. In the other cases, instead, the NEA secretariat has a more direct responsibility, conferred by the CSNI, in establishing the project technical and financial basis, as well as for its implementation and administration. The objective of this procedure is to provide a common basis for the establishment and management of the OECD projects in the area of nuclear safety. It is a follow-up of a recommendation expressed by the CSNI Bureau during its meeting in October 2001, where the procedures for the establishment and management of the OECD (CSNI) projects in nuclear safety were addressed. While this procedure attempts at defining general guidelines for project initiation, financing and management, one should bear in mind that each project has its own motivation, background and framework. Thus, some degree of flexibility in project structure

  5. THESEUS - a research project to improve the safety standard of tank vehicles for dangerous goods

    International Nuclear Information System (INIS)

    Guenther, B.

    1992-01-01

    A research project reffered to as THESEUS was initiated by the Federal Ministry of Research and Technology of Germany. The intent of the investigation is to generate measures designed to enhance the safety standard of commercial transports of dangerous goods in tank vehicles. Hereby, the analysis of real accidents by teams within the project will provide the relevant parameters for the experimental and theoretical investigation of vehicles, tank components and safety devices. The project started in summer 1990. This paper will focus main features and the work done so far. Special consideration will be made to the failure behaviour of tank components as the authors field of activity. (orig.)

  6. Safety assessment and regulatory strategy for NPP I and C modernization projects

    Energy Technology Data Exchange (ETDEWEB)

    Manners, S.; Blocquel, Ch

    1999-10-01

    IPSN is the technical support for the French nuclear safety authority (DSIN), but also acts independently. Through our participation at this IAEA meeting we wish to further our appreciation of the industry position for I and C modernization projects. We will present some of the concerns of the safety assessor and safety authority for such projects. We hope to share our experiences and views concerning current strategies for I and C modernization and licensing from. In our experience with NPP I and C programmes, the need for modification is most often not directly linked to safety. For our safety assessment we have to identify clearly and, as far as possible, categorize the safety relevance of the specified modifications and all safety impact in its implementation. Modernization can be simply for reasons of replacement of obsolete existing equipment or it can be linked to functional evolutions; safety functions may be directly or indirectly affected. The state of the art I and C solutions proposed by today's modernization programs have many benefits, but also pose a certain number of difficulties for the safety demonstration. On the implementation side, the safety assessment for a modernization project has to take into consideration specific issues compared with that for new plant. These include interface and compatibility with the existing installation, issues relating to 'on line' installation and commissioning, as well as operational issues concerning the changeover and trail periods. A further subject for discussion concerns how our regulatory requirements apply to modernization. We must as a minima comply with the requirements of the period. To what measure must we apply current or future (under development or for future reactor designs) standards? How can we tie in with requirements and legislation for new projects? Do we make a special case for back-fits? (authors)

  7. Safety assessment and regulatory strategy for NPP I and C modernization projects

    International Nuclear Information System (INIS)

    Manners, S.; Blocquel, Ch.

    1999-10-01

    IPSN is the technical support for the French nuclear safety authority (DSIN), but also acts independently. Through our participation at this IAEA meeting we wish to further our appreciation of the industry position for I and C modernization projects. We will present some of the concerns of the safety assessor and safety authority for such projects. We hope to share our experiences and views concerning current strategies for I and C modernization and licensing from. In our experience with NPP I and C programmes, the need for modification is most often not directly linked to safety. For our safety assessment we have to identify clearly and, as far as possible, categorize the safety relevance of the specified modifications and all safety impact in its implementation. Modernization can be simply for reasons of replacement of obsolete existing equipment or it can be linked to functional evolutions; safety functions may be directly or indirectly affected. The state of the art I and C solutions proposed by today's modernization programs have many benefits, but also pose a certain number of difficulties for the safety demonstration. On the implementation side, the safety assessment for a modernization project has to take into consideration specific issues compared with that for new plant. These include interface and compatibility with the existing installation, issues relating to 'on line' installation and commissioning, as well as operational issues concerning the changeover and trail periods. A further subject for discussion concerns how our regulatory requirements apply to modernization. We must as a minima comply with the requirements of the period. To what measure must we apply current or future (under development or for future reactor designs) standards? How can we tie in with requirements and legislation for new projects? Do we make a special case for back-fits? (authors)

  8. safety risk management based on fuzzy logic at underground projects

    Directory of Open Access Journals (Sweden)

    Farhad Taherkhani

    2017-11-01

    Conclusion: In the present article, a new model was developed to calculate the probability of occurrence of the event, which so far has not been addressed in other studies. Finally, effective measures can be taken to reduce the risk of a project by eliminating the high risk factors.

  9. The action of the project coordinator with respect to reactor safety

    International Nuclear Information System (INIS)

    Leclercq, Jacques

    1981-01-01

    Before describing the various actions of the project coordinator (EDF) entrusted with the building of nuclear power stations, with respect to reactor safety in France, the definition of reactor safety and the various participants are mentioned first. These participants are: the Government Departments and the Experts involved (the Department of Nuclear Safety of the 'Institut de Protection et de Surete Nucleaire' forming the first technical support) and the applicant, namely the EDF. The reactor safety actions of the project coordinator are defined as from the following components: 1 - The targets laid down with respect to safety, the final objective being the protection of workers and the public against the potential dangers of the installations, principally against radiation. 2 - The safety methodology at the design stage of the power station: 'barrier' method, defence method in depth at three levels, lines of assurance method, and probabilistic method. 3 - Safety actions at the construction stage within the context of an assurance of quality programe. 4 - Safety at the trials, commissioning and operating stage, with the backing of the 'Groupe Operationnel de Demarrage (G.O.D.)' and the 'Commission d'Essais sur Site (C.E.S.)'. An initial balance sheet of the reactor safety actions for the PWR units built by the EDF is presented [fr

  10. Incorporation of occupational health and safety in cleaner production projects in South Africa

    DEFF Research Database (Denmark)

    Hedlund, Frank Huess

    2002-01-01

    The purpose of this research is to reveal ways in which occupational health and safety can be integrated in environmental cleaner production projects. Of particular interest are those cleaner production projects that are run by the Danish government's environmental assistance agency, Danced......, in South Africa.The study explores two main avenues of integration. First, integrating through better planning, focussing at the tools and procedures in use by Danced for project management -- integrating occupational health and safety into the project specification, so to speak.Second, integrating...... occupational health and safety into the environmental activities that take place at company level. Two ways of doing so are explored, the main distinction being company size. For large companies, integration of management systems may be attractive. For small companies, integration into a less formal network...

  11. Safety analysis for the 233-S decontamination and decommissioning project

    International Nuclear Information System (INIS)

    Thoren, S.

    1996-08-01

    Decommissioning of the 233-S Plutonium Concentration Facility (REDOX) is a proposed expedited response action that is regulated by the Comprehensive Environmental Response Compensation and Liability Act of 1980 and the Hanford Federal Facility Agreement and Consent Order. Due to progressive physical deterioration of this facility, a decontamination and decommissioning plan is being considered for the immediate future. This safety analysis describes the proposed actions involved in this D ampersand D effort; identifies the radioactive material inventories involved; reviews site specific environmental characteristics and postulates an accident scenario that is evaluated to identify resultant effects

  12. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  13. Focusing on patient safety in the Neonatal Intensive Care Unit environment

    Directory of Open Access Journals (Sweden)

    Ilias Chatziioannidis

    2017-02-01

    Full Text Available Patient safety in the Neonatal Intensive Care Unit (NICU environment is an under-researched area, but recently seems to get high priority on the healthcare quality agenda worldwide. NICU, as a highly sensitive and technological driven environment, signals the importance for awareness in causation of mistakes and accidents. Adverse events and near misses that comprise the majority of human errors, cause morbidity often with devastating results, even death. Likewise in other organizations, errors causes are multiple and complex. Other high reliability organizations, such as air force and nuclear industry, offer examples of how standardized/homogenized work and removal of systems weaknesses can minimize errors. It is widely accepted that medical errors can be explained based on personal and/or system approach. The impact/effect of medical errors can be reduced when thorough/causative identification approach is followed by detailed analysis of consequences and prevention measures. NICU’s medical and nursing staff should be familiar with patient safety language, implement best practices, and support safety culture, maximizing efforts for reducing errors. Furthermore, top management commitment and support in developing patient safety culture is essential in order to assure the achievement of the desirable organizational safety outcomes. The aim of the paper is to review patient safety issues in the NICU environment, focusing on development and implementation of strategies, enhancing high quality standards for health care.

  14. ICT support safety, health and environment management system (e-SHEMS)

    International Nuclear Information System (INIS)

    Amy Hamijah Ab Hamid; Hasfazilah Hassan; Siti Massari Amran; Norzalina Nasirudin; Azimawati Ahmad; Mohd Suhaimi Kassim; Shaharum Ramli; Musa Ibrahim; Mohd Sidek Othman

    2009-01-01

    Safety program is compulsory for a nuclear technology related research and development institution like Nuclear Malaysia. It has been implemented in various safety standard systems including Act 514, Act 304, ISO 14000, OSHAS 18001 and IAEA. This paper began with Nuclear Malaysia history in initiating our own safety standard system since 1982. Currently, Nuclear Malaysia's Safety Health and Environment Management System (SHE-MS) was stipulated for similar purpose. Furthermore, it has implemented guidelines by AELB, IAEA, DOSH, Fire Brigade and Police Force. This paper briefly describes the overall structure of SHE-MS, how it functions and being managed, and lessons learned. The findings which are based on the issues and challenges, then it can be analysed to propose a development of SHE-MS ICT-support application for future improvement and enhancement in inculcating and nurturing safety culture among Nuclear Malaysia staff. (Author)

  15. MODELS AND METHODS OF SAFETY-ORIENTED PROJECT MANAGEMENT OF DEVELOPMENT OF COMPLEX SYSTEMS: METHODOLOGICAL APPROACH

    Directory of Open Access Journals (Sweden)

    Олег Богданович ЗАЧКО

    2016-03-01

    Full Text Available The methods and models of safety-oriented project management of the development of complex systems are proposed resulting from the convergence of existing approaches in project management in contrast to the mechanism of value-oriented management. A cognitive model of safety oriented project management of the development of complex systems is developed, which provides a synergistic effect that is to move the system from the original (pre condition in an optimal one from the viewpoint of life safety - post-project state. The approach of assessment the project complexity is proposed, which consists in taking into account the seasonal component of a time characteristic of life cycles of complex organizational and technical systems with occupancy. This enabled to take into account the seasonal component in simulation models of life cycle of the product operation in complex organizational and technical system, modeling the critical points of operation of systems with occupancy, which forms a new methodology for safety-oriented management of projects, programs and portfolios of projects with the formalization of the elements of complexity.

  16. Automation of closed environments in space for human comfort and safety

    Science.gov (United States)

    1992-01-01

    This report culminates the work accomplished during a three year design project on the automation of an Environmental Control and Life Support System (ECLSS) suitable for space travel and colonization. The system would provide a comfortable living environment in space that is fully functional with limited human supervision. A completely automated ECLSS would increase astronaut productivity while contributing to their safety and comfort. The first section of this report, section 1.0, briefly explains the project, its goals, and the scheduling used by the team in meeting these goals. Section 2.0 presents an in-depth look at each of the component subsystems. Each subsection describes the mathematical modeling and computer simulation used to represent that portion of the system. The individual models have been integrated into a complete computer simulation of the CO2 removal process. In section 3.0, the two simulation control schemes are described. The classical control approach uses traditional methods to control the mechanical equipment. The expert control system uses fuzzy logic and artificial intelligence to control the system. By integrating the two control systems with the mathematical computer simulation, the effectiveness of the two schemes can be compared. The results are then used as proof of concept in considering new control schemes for the entire ECLSS. Section 4.0 covers the results and trends observed when the model was subjected to different test situations. These results provide insight into the operating procedures of the model and the different control schemes. The appendix, section 5.0, contains summaries of lectures presented during the past year, homework assignments, and the completed source code used for the computer simulation and control system.

  17. The School Assessment for Environmental Typology (SAfETy): An Observational Measure of the School Environment.

    Science.gov (United States)

    Bradshaw, Catherine P; Milam, Adam J; Furr-Holden, C Debra M; Johnson, Sarah Lindstrom

    2015-12-01

    School safety is of great concern for prevention researchers, school officials, parents, and students, yet there are a dearth of assessments that have operationalized school safety from an organizational framework using objective tools and measures. Such a tool would be important for deriving unbiased assessments of the school environment, which in turn could be used as an evaluative tool for school violence prevention efforts. The current paper presents a framework for conceptualizing school safety consistent with Crime Prevention through Environmental Design (CPTED) model and social disorganization theory, both of which highlight the importance of context as a driver for adolescents' risk for involvement in substance use and violence. This paper describes the development of a novel observational measure, called the School Assessment for Environmental Typology (SAfETy), which applies CPTED and social disorganizational frameworks to schools to measure eight indicators of school physical and social environment (i.e., disorder, trash, graffiti/vandalism, appearance, illumination, surveillance, ownership, and positive behavioral expectations). Drawing upon data from 58 high schools, we provide preliminary data regarding the validity and reliability of the SAfETy and describe patterns of the school safety indicators. Findings demonstrate the reliability and validity of the SAfETy and are discussed with regard to the prevention of violence in schools.

  18. The effect of Health, Safety and Environment Management System (HSE-MS on the improvement of safety performance indices in Urea and Ammonia Kermanshah Petrochemical Company

    Directory of Open Access Journals (Sweden)

    M. S. Poursoleiman

    2015-09-01

    .Conclusion: The implementation of Health, Safety and the Environment Management System caused a reduction in accidents and its consequences and most of the safety performance indices in the entire process cycle of Kermanshah Petrochemical Company. Overall, safety condition has been improved considerably.

  19. 30 CFR 250.107 - What must I do to protect health, safety, property, and the environment?

    Science.gov (United States)

    2010-07-01

    ..., property, and the environment? 250.107 Section 250.107 Mineral Resources MINERALS MANAGEMENT SERVICE... Performance Standards § 250.107 What must I do to protect health, safety, property, and the environment? (a) You must protect health, safety, property, and the environment by: (1) Performing all operations in a...

  20. Concluding colloquium of the Nuclear Safety Project (PNS)

    International Nuclear Information System (INIS)

    1986-08-01

    The main points of the report are: environmental loads due to nuclear power stations and fuel reprocessing plants, behaviour of the system during reactor faults, extent of damage for the largest hypothetical reactor accidents and its dependence on time, assessment of the consequences of large hypothetical accidents and safety-related assessment of nuclear plants. The contributions relate particularly to the dynamic stresses on reactor components, behaviour of fuel elements in accidents, core melt-down accidents in LWR's and retention, behaviour and effects of released radionuclides from nuclear plants. Up-dating contributions concern the course, the effects and the analysis of the Chernobyl reactor accident. One contribution each is concerned with the development of waste air filters, the soil/plant transfer of actinides and the description of an FDWR. (DG) [de

  1. Final report investigation project agricultural products and environment

    International Nuclear Information System (INIS)

    Loria, L.G.; Jimenez Dam, R.; Mora Rodriguez, P.

    1998-01-01

    The document presents the after-action report on six investigation projects: Thermoluminescence, Spectrometry gamma of low level, Agricultural products, Radon in the subsoil, Nuclear instrumentation, and X-ray fluorescence, executed between 1995-1997 by the Laboratory of Physical Nuclear Applied of the University of Costa Rica, in the which objectives are shown, applied methodology as well as the achievements and results each project. (Author) [es

  2. Reactor safety in industrial nuclear power plants. Developments in a political and technical environment as it prevails in the German Federal Republic

    International Nuclear Information System (INIS)

    Laufs, Paul

    2013-01-01

    The present book describes the development of reactor safety in German light-water nuclear power plants from the beginnings with its multifarious links to model solutions seen in other countries, national and international research projects and accidents in conventional and nuclear power plants. It contains detailed, richly illustrated articles on specific safety techniques such as rupture safety of the pressurised envelope, safeguarding of emergency cooling in the event of accidents involving coolant loss, control technology and protection of the surroundings through containment. The results of national and international risk studies are discussed. It is shown how efforts on the part of industry, government and science to enhance safety resources and improve safety culture have been driven by a civic environment in which the use of nuclear energy has become a central issue of political debate. The book is written in readily comprehensible language and offers a wealth of material for further study.

  3. 75 FR 5511 - Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's...

    Science.gov (United States)

    2010-02-03

    ..., including potential falling debris and the use of heavy equipment and machinery in the waterway, could lead... operation presents a potential hazard to mariners from falling debris and the use of heavy equipment and machinery. To provide for the safety of the public, the Coast Guard will temporarily restrict access to this...

  4. Research and development of technologies for safe and environmentally optimal recovery and disposal of explosive wastes. Task 2, Preliminary impact assessment for environment, health and safety (EIA)

    Energy Technology Data Exchange (ETDEWEB)

    Duijm, N.J.; Markert, F. [Risoe (Denmark); Larsen, S.G. [DEMEX A/S (Denmark)

    1998-09-01

    As described in the project proposal `Research and Development of Technologies for Safe and Environmentally optimal recovery and Disposal of Explosive Wastes`, dated 31. May 1996, the objective of Task 2, Preliminary Impact Assessment for Environment, Health and Safety, is to: Analyse the environmental impact of noise and emissions to air, water and soil; Assess the risk of hazards to workers` health and safety and to the public. Task 2, Preliminary Impact Assessment for Environment, Health and Safety (EIA), has been performed from August 1997 to September 1998. First, a methodology has been established, based on Multi-Criteria Decision Analysis (MCDA), to select the `best` technology on the basis of clearly defined objectives, including minimal impacts on environment, health and safety. This included a review of different types of explosive waste with a focus on the environment implications, identifying the issues relevant to defining the criteria or objectives with respect to environment and safety in the framework of explosive waste, as well as the preliminary definition of objectives for the final impact assessment. Second, the previously identified recovery and disposal technologies (Task 1) have been qualitatively assessed on the basis of the relevant objectives. This qualitative assessment includes also economic considerations and an attempt to rank the technologies in an MCDA framework. (au)

  5. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  6. The FORO Project on Safety Culture in Organizations, Facilities and Activities With Sources of Ionizing Radiation

    International Nuclear Information System (INIS)

    Bomben, A. M.; Ferro Fernández, R.; Arciniega Torres, J.; Ordoñez Gutiérrez, E.; Blanes Tabernero, A.; Cruz Suárez, R.; Da Silva Silveira, C.; Perera Meas, J.; Ramírez Quijada, R.; Videla Valdebenito, R.

    2016-01-01

    The aim of this paper is to present the Ibero-American Forum of Nuclear and Radiological Regulatory Authorities’ (FORO) Project on Safety Culture in organizations, facilities and activities with sources of ionizing radiation developed by experts from the Regulatory Authorities of Argentina, Brazil, Chile, Cuba, Spain, Mexico, Peru and Uruguay, under the scientific coordination of the International Atomic Energy Agency (IAEA). Taking into account that Safety Culture problems have been widely recognised as one of the major contributors to many radiological events, several international and regional initiatives are being carried out to foster and develop a strong Safety Culture. One of these initiatives is the two-year project sponsored by the FORO with the purpose to prepare a document to allow its member states understanding, promoting and achieving a higher level of Safety Culture.

  7. Fast or Smart? How the Use of Scrum Can Influence the Temporal Environment in a Project

    DEFF Research Database (Denmark)

    Scheller, Vibeke Kristine; Hvid, Helge Søndergaard; Pries-Heje, Jan

    2015-01-01

    A recent survey shows that 40% of all projects use, or have used, agile methods. The most commonly used agile method is Scrum, one reason being that Scrum provides mechanisms for building a healthy temporal environment for the project participants. Through a case study carried out in a Danish...... municipality we demkonstrate how the tgemporal environment in a project is influenced - enhanced as well as challenged - by the use of Scrum....

  8. Towards the Verification of Safety-critical Autonomous Systems in Dynamic Environments

    Directory of Open Access Journals (Sweden)

    Adina Aniculaesei

    2016-12-01

    Full Text Available There is an increasing necessity to deploy autonomous systems in highly heterogeneous, dynamic environments, e.g. service robots in hospitals or autonomous cars on highways. Due to the uncertainty in these environments, the verification results obtained with respect to the system and environment models at design-time might not be transferable to the system behavior at run time. For autonomous systems operating in dynamic environments, safety of motion and collision avoidance are critical requirements. With regard to these requirements, Macek et al. [6] define the passive safety property, which requires that no collision can occur while the autonomous system is moving. To verify this property, we adopt a two phase process which combines static verification methods, used at design time, with dynamic ones, used at run time. In the design phase, we exploit UPPAAL to formalize the autonomous system and its environment as timed automata and the safety property as TCTL formula and to verify the correctness of these models with respect to this property. For the runtime phase, we build a monitor to check whether the assumptions made at design time are also correct at run time. If the current system observations of the environment do not correspond to the initial system assumptions, the monitor sends feedback to the system and the system enters a passive safe state.

  9. Dissemination material template, Deliverable 2.2 of the H2020 project SafetyCube (Safety CaUsation, Benefits and Efficiency).

    NARCIS (Netherlands)

    Tros, M. & Houtenbos, M.

    2016-01-01

    Safety CaUsation, Benefits and Efficiency (SafetyCube) is a European Commission supported Horizon 2020 project with the objective of developing an innovative road safety Decision Support System (DSS) that will enable policy-makers and stakeholders to select and implement the most appropriate

  10. Definition of user needs and “hot topics”, Deliverable 2.1 of the H2020 project SafetyCube (Safety CaUsation, Benefits and Efficiency).

    NARCIS (Netherlands)

    Hagström, L. Thomson, R. Skogsmo, I. Houtenbos, M. Durso, C. Thomas, P. Elvik, R. & Wismans, J.

    2016-01-01

    Safety CaUsation, Benefits and Efficiency (SafetyCube) is a European Commission supported Horizon 2020 project with the objective of developing an innovative road safety Decision Support System (DSS) that will enable policymakers and stakeholders to select and implement the most appropriate

  11. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  12. Safety and Environment- Masterplan 2020 of DLR's Rocket Test Center Lampoldhausen

    Science.gov (United States)

    Haberzettl, Andreas; Dommers, Michael

    2013-09-01

    The German Aerospace Center DLR is the German research institute with approximately 7000 employees in 16 domestic locations. Among the research priorities of the German Aerospace Center DLR includes aerospace, energy and transport. DLR is institutionally supported by federal and state governments.Next funding sources arise in the context of third-party funds business (contract research and public contracts and subsidiaries). Main activities of the test center Lampoldshausen are testing of ARIANE's main and upper stage engines in the frame of ESA contracts.In the last years the test center of the DLR in Lampoldshausen has grown strongly, so that the number of employees is actually of about 230. The testing department is mainly responsible for rocket combustion testing according to customer requirements.Two kinds of test facilities are operated, sea level test benches and the altitude simulation test facilities.In addition to the DLR's growth also the activities of the industrial partner ASTRIUM has been elevated so that actually nearly 600 employees are present on site Lampoldshausen.The management of the site in relation to safety and security requires special measures with special respect to the presence of more people inside the testing area in order to guarantee trouble-free and safe experimental operation onsite the DLR's test plants. In order to meet with the future needs of continuing growth, the security and safety requirements have to be adopted.This report gives comprehensive outlook information about future possible scenarios of our coming tasks.Main driving force for future requests is the evolution of the rocket ARIANE. The testing of the new upper stage test facility for ARIANE 5 midlife evolution has been started. A new test position P5.2 is foreseen to perform the qualification of the new upper stage with the VINCI engine. This project will be very complex, in parallel running operation processes will require special procedures related to the overall

  13. Project InterActions: A Multigenerational Robotic Learning Environment

    Science.gov (United States)

    Bers, Marina U.

    2007-12-01

    This paper presents Project InterActions, a series of 5-week workshops in which very young learners (4- to 7-year-old children) and their parents come together to build and program a personally meaningful robotic project in the context of a multigenerational robotics-based community of practice. The goal of these family workshops is to teach both parents and children about the mechanical and programming aspects involved in robotics, as well as to initiate them in a learning trajectory with and about technology. Results from this project address different ways in which parents and children learn together and provide insights into how to develop educational interventions that would educate parents, as well as children, in new domains of knowledge and skills such as robotics and new technologies.

  14. Cloud/Fog Computing System Architecture and Key Technologies for South-North Water Transfer Project Safety

    Directory of Open Access Journals (Sweden)

    Yaoling Fan

    2018-01-01

    Full Text Available In view of the real-time and distributed features of Internet of Things (IoT safety system in water conservancy engineering, this study proposed a new safety system architecture for water conservancy engineering based on cloud/fog computing and put forward a method of data reliability detection for the false alarm caused by false abnormal data from the bottom sensors. Designed for the South-North Water Transfer Project (SNWTP, the architecture integrated project safety, water quality safety, and human safety. Using IoT devices, fog computing layer was constructed between cloud server and safety detection devices in water conservancy projects. Technologies such as real-time sensing, intelligent processing, and information interconnection were developed. Therefore, accurate forecasting, accurate positioning, and efficient management were implemented as required by safety prevention of the SNWTP, and safety protection of water conservancy projects was effectively improved, and intelligential water conservancy engineering was developed.

  15. Food Safety in the Domestic Environment: The Effect of Consumer Risk Information on Human Disease Risks

    NARCIS (Netherlands)

    Nauta, M.J.; Fischer, A.R.H.; Asselt, van E.D.; Jong, de A.E.I.; Frewer, L.J.; Jonge, de R.

    2008-01-01

    The improvement of food safety in the domestic environment requires a transdisciplinary approach, involving interaction between both the social and natural sciences. This approach is applied in a study on risks associated with Campylobacter on broiler meat. First, some web-based information

  16. Is green space in the living environment associated with people's feelings of social safety?

    NARCIS (Netherlands)

    Maas, J.; Spreeuwenberg, P.; Winsum-Westra, M. van; Verheij, R.A.; Vries, S. de; Groenewegen, P.P.

    2009-01-01

    The authors investigate whether the percentage of green space in people’s living environment affects their feelings of social safety positively or negatively. More specifically they investigate the extent to which this relationship varies between urban and rural areas, between groups in the

  17. Is green space in the living environment associated with people's feelings of social safety?

    NARCIS (Netherlands)

    Maas, J.; Spreeuwenberg, P.; Winsum-Westra, M. van; Verheij, R.A.; Vries, S. de; Groenewegen, P.P.

    2009-01-01

    Abstract. The authors investigate whether the percentage of green space in people's living environ- ment affects their feelings of social safety positively or negatively. More specifically they investigate the extent to which this relationship varies between urban and rural areas, between groups in

  18. Measuring School Climate in High Schools: A Focus on Safety, Engagement, and the Environment

    Science.gov (United States)

    Bradshaw, Catherine P.; Waasdorp, Tracy E.; Debnam, Katrina J.; Johnson, Sarah Lindstrom

    2014-01-01

    Background: School climate has been linked to multiple student behavioral, academic, health, and social-emotional outcomes. The US Department of Education (USDOE) developed a 3-factor model of school climate comprised of safety, engagement, and environment. This article examines the factor structure and measurement invariance of the USDOE model.…

  19. Perceptions of Psychological and Physical Safety Environments of Information Technology Employees: A Phenomenological Study

    Science.gov (United States)

    Payne, Sheila C.

    2012-01-01

    A qualitative phenomenological study was conducted to gain a deeper understanding of psychological and safety environments of an oil and gas multinational enterprise. Twenty information technology professionals were interviewed to explore their feelings, perceptions, beliefs, and values of the phenomenon. The interviews elicited data about facets…

  20. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR-06 are highlighted, and the future of the two projects is discussed

  1. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  2. Upgrade Uranium Recovery Project No. 34110: final safety analysis report

    International Nuclear Information System (INIS)

    1981-09-01

    The accident analysis of the upgrade uranium recovery system indicated three potential hazards: (1) criticality, (2) toxic fumes from nitric acid solutions, and (3) release of toxic uranyl nitrate solutions. Any of these are capable of causing the death of one or more employees; therefore, they form the basis for the residual risks identified below. The analysis found no hazardous energies or substances capable of causing irreversible injury to, or the death of, any members of the public. The following residual risks will be controlled administratively by procedural constraints: An operator or maintenance error will cause 235 U to be transferred into an unsafe container and cause a criticality. An operator or maintenance error will cause containers of 235 U bearing material to be improperly spaced and cause a criticality. Extensive corrosion will cause a hole to form in a calciner tube, the corrosion will go undetected, and a criticality will result, and a loss of system and/or building solution containment will occur concurrent with a drain being open resulting in a criticality and/or release of toxic material. Additional residual risks that have a small probability are that an earthquake or tornado will affect the building, alter the system geometry, and initiate a criticality; that the compressed-gas (nitrogen) cylinder valve will be sheared off, become airborne, and alter the system geometry; and that loss of system and/or building solution containment may occur concurrently with fire sprinkler system actuation causing a criticality and/or release of toxic material. The following residual risks will be addressed in the Safety Study of the existing X-705 Building: that a spill of raffinate highly contaminated with 99 Tc will occur due to operator error or incorrect lab analysis and that a gaseous or liquid effluent release of small amounts of transuranic elements will occur

  3. Personalized learning Ecologies in Problem and Project Based Learning Environments

    DEFF Research Database (Denmark)

    Rongbutsri, Nikorn; Ryberg, Thomas; Zander, Pär-Ola

    2012-01-01

    is in contrast to an artificial learning setting often found in traditional education. As many other higher education institutions, Aalborg University aims at providing learning environments that support the underlying pedagogical approach employed, and which can lead to different online and offline learning.......g. coordination, communication, negotiation, document sharing, calendars, meetings and version control. Furthermore, the pedagogical fabric of LMSs/VLEs have recently been called into question and critiqued by proponents of Personal Learning Environments (PLEs)(Ryberg, Buus, & Georgsen, 2011) . In sum....... making it important to understand and conceptualise students’ use of technology. Ecology is the study of relationship between organisms in an environment which is the set of circumstances surrounding that organism. Learning ecologies are the study of the relationship of a learner or a group of learners...

  4. Report of the 52. meeting of the Superior Council of the Nuclear Safety and Information (project)

    International Nuclear Information System (INIS)

    2000-01-01

    Since june 2000, the CSSIN (Superior Council on Nuclear Safety and Information) decided to present the meeting of its sessions, on the Internet site of the Nuclear Safety Authority. This document is the meeting project concerning the session of the 27 june 2000. The following subjects have been treated: the Blayais accident and its consequences; the Euratom Directive transposition on the workers and people protection; methodology and organization of the CSSIN concerning the civil nuclear installations and the radiation protection; actualization of the CSSIN heading in the Internet site of the Nuclear Safety Authority. (A.L.B.)

  5. Nordic nuclear safety research 1994-1997. Project on disposal of radioactive waste

    International Nuclear Information System (INIS)

    Broden, Karin

    1999-01-01

    This presentation describes the Nordic Nuclear Safety Research (NKS) programme, which is a scientific co-operation programme in nuclear safety, radiation protection and emergence preparedness. The purpose of the programme is to carry out cost-effective Nordic projects, thus producing research results, exercises, information, manuals, recommendations, and other types of background material. This material is to serve decision-makers and other concerned staff members at authorities, research establishments and enterprises in the nuclear field. Three waste disposal projects under NKS are briefly described: (1) Waste characterisation, (2) Performance analysis of the engineered barrier system of the repositories for low- and intermediate-level waste, (3) Environmental impact assessment

  6. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  7. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  8. Ferrocyanide safety project task 3 ferrocyanide aging studies FY 1994 annual report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Alderson, E.V.; Kowalski, D.J.; Lumetta, M.R.; Schiefelbein, G.F.

    1994-09-01

    The research performed for this project is part of an effort begun in the mid-1980s to characterize the materials stored in the single-shell waste storage tanks (SSTs) at the U.S. Department of Energy (DOE) Hanford Site. Various radioactive wastes from defense operations have accumulated at the Hanford Site in underground waste tanks since the early 1940s. The goal of the Aging Studies task is to understand the long-term chemical and radiolytic behavior of ferrocyanide tank wastes in the SST environments. In turn, this information provides baseline data that will be useful as actual SST samples are obtained and analyzed. The results of aging studies will directly assist in determining which strategy will assure safe storage of the ferrocyanide waste in the tanks and how the ferrocyanide safety issue can be resolved. This report contains the results of FY 1994 research for the Aging Studies task, which focused on the hydrolysis of ferrocyanide waste simulants in aqueous base. Hydrolysis was investigated in 2M NaOH as a function of temperature, applied gamma dose rate, and soluble Fe(CN) 6 -4 concentration. A hydrolysis experiment was conducted at pH 10 and another in the presence of aluminum. In addition, experiments investigating cesium ion exchange in competition with sodium nickel ferrocyanide dissolution were conducted

  9. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  10. Overview of a radiation safety program in a district style medical environment

    International Nuclear Information System (INIS)

    Wilson, G.

    2006-01-01

    This paper provides an overview of the eight components of a radiation safety program in a large health care facility spread out over several campuses in a large geographic area in Nova Scotia. The main focus is based on those areas that are regulated by the Canadian Nuclear Safety Commission and generally encompass nuclear medicine and radiation therapy operations. X-ray operations are regulated provincially, but the general operational principles of an effective radiation safety program can be applied in all these areas. The main components covered include the set up of an organizational structure that operates separately from individual departments, general items expected from reports to corporate management or regulators, and some examples of the front-line expectations for those in individual departments. The review is not all encompassing, but should give organizations some insight of the magnitude of a radiation safety program in a district style environment. (author)

  11. High Speed Railway Environment Safety Evaluation Based on Measurement Attribute Recognition Model

    Directory of Open Access Journals (Sweden)

    Qizhou Hu

    2014-01-01

    Full Text Available In order to rationally evaluate the high speed railway operation safety level, the environmental safety evaluation index system of high speed railway should be well established by means of analyzing the impact mechanism of severe weather such as raining, thundering, lightning, earthquake, winding, and snowing. In addition to that, the attribute recognition will be identified to determine the similarity between samples and their corresponding attribute classes on the multidimensional space, which is on the basis of the Mahalanobis distance measurement function in terms of Mahalanobis distance with the characteristics of noncorrelation and nondimensionless influence. On top of the assumption, the high speed railway of China environment safety situation will be well elaborated by the suggested methods. The results from the detailed analysis show that the evaluation is basically matched up with the actual situation and could lay a scientific foundation for the high speed railway operation safety.

  12. MODERN THREATS OF SOCIAL SAFETY OF THE EDUCATION ENVIRONMENT AND THEIR PREVENTION

    Directory of Open Access Journals (Sweden)

    Павел Александрович Кисляков

    2013-04-01

    Full Text Available Purpose: identify modern threats of safety of the school and substantiate the direction of their prevention.Methodology: a theoretical analysis of psychological and pedagogical literature on the issues of safety of students.Results: on the basis of theoretical and empirical analysis identified the following threats of social safety of the education environment: criminal threats, threats of extremism and terrorism, physical and mental abuse, interpersonal conflicts, addictive behavior of students. Substantiates the necessity the design of social safety protection, including space of health, space of tolerance, psychologically comfortable space without violence also providing appropriate training of educators.Practical implications: the system of education.DOI: http://dx.doi.org/10.12731/2218-7405-2013-2-2

  13. Operating environment threats influence on the maritime ferry technical system safety – the numerical approach

    Directory of Open Access Journals (Sweden)

    Kuligowska Ewa

    2017-06-01

    Full Text Available The material given in this paper delivers the procedure for numerical approach that allows finding the main practically important safety characteristics of the complex technical systems at the variable operation conditions including operating environment threats. The obtained results are applied to the safety evaluation of the maritime ferry technical system. It is assumed that the conditional safety functions are different at various operation states and have the exponential forms. Using the procedure and the program written in Mathematica, the considered maritime ferry technical system main characteristics including: the conditional and the unconditional expected values and standard deviations of the system lifetimes, the unconditional safety function and the risk function are determined.

  14. Project SAFE. Update of the SFR-1 safety assessment. Phase 1. Appendix A1: Inventory

    International Nuclear Information System (INIS)

    Riggare, P.

    1998-01-01

    One of the aims in the safety assessment of SFR-1 is to estimate the release to the environment. In order to make these calculations there is a need to describe the inventory in greater detail. The new computerised database of waste in SFR-1 gives a good possibility to achieve this. The aim for project SAFE is to make both conservative and realistic radionuclide transport calculations. To achieve this goal there must be two inventories. The conservative inventory is the inventory used in the design of the repository, which in most parts is identical with the limits in the licence for SFR-1. There is a great interest to have good estimates of the volumes of the different waste types. A thorough prognosis should be made in 1999, but until then the latest one from 1995 could be used in the calculations. The total (actual) inventory of nuclides is calculated from the measurements of the easy-to-measure nuclides since, in principle, all hard-to-measure nuclides are calculated by correlation factors to 60 Co and 137 Cs . These factors should be reviewed since there are quite large uncertainties involved. 14 C dominates the individual doses after a few hundred years and the collective dose in the inland-scenario. The amount of the nuclide is uncertain since the correlation factor is very uncertain. The chemical speciation of 14 C is also of interest due to different properties of organic and inorganic carbon. 36 Cl is very hard to measure. Although the authorities in their reviews of the safety reports say that there probably are small doses from chlorine, the inventory should be improved. 59 Ni is a long-lived nuclide that sets a limit to the close-to-the-core metal scrap that can be taken to SFR- 1. There is an ongoing research project to provide a better measuring method for 59 Ni. This should make it possible to improve the knowledge about 59 Ni inventory. The assumption that 90 % of the inventory is collected in the ion-exchange resins should be checked. Actinides

  15. Developing an action-based health and safety training project in southern China.

    Science.gov (United States)

    Szudy, Betty; O'Rourke, Dara; Brown, Garrett D

    2003-01-01

    A project brought together international footwear manufacturers, labor rights groups, local contract factories, and occupational health professionals to strengthen factory health and safety programs in southern China. Steps involved in the two-year project, including needs assessment, interviews and focus groups with workers and supervisors; design and development of a participatory workshop; development of plant-wide health and safety committees in three footwear factories; and evaluation project impact, are discussed. The project significantly increased occupational safety and health knowledge, and hazards in the factories were identified and corrected. Successes and challenges faced by three functioning worker-management health and safety committees are discussed. Key elements to create effective programs with meaningful participation by workers include: 1) developing clear guidelines that enable multi-stakeholder groups to collaborate; 2) obtaining top-level management support; 3) building workers' knowledge and capacity to fully participate; 4) involving local labor rights groups and occupational professionals in support and technical assistance; and 5) connecting project goals to larger issues within a country and the global economy.

  16. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    Accident consequence analyses have been performed for Project W-058, the Replacement Cross Site Transfer System. using the assumption and analysis techniques developed for the Tank Remediation Waste system Basis for Interim Operation. most potential accident involving the FISTS are bounded by the TWRS BIO analysis. However, the spray leak and pool leak scenarios require revised analyses since the RCSTS design utilizes larger diameter pipe and higher pressures than those analyzed in the TWRS BIO. Also the volume of diversion box and vent station are larger than that assumed for the valve pits in the TWRS BIO, which effects results of sprays or spills into the pits. the revised analysis for the spray leak is presented in Section 2, for the above ground spill in Section 3, for the presented in Section 2, for the above ground spill in Section 3, for the subsurface spill forming a pool in Section 4, and for the subsurface pool remaining subsurface in Section 5. The conclusion from these sections are summarized below

  17. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  18. JRC/IE support activities to PHARE nuclear safety programmes. Dissemination of PHARE project results

    International Nuclear Information System (INIS)

    Ranguelova, V.; Pla, P.; Rieg, C.; Bieth, M.

    2005-01-01

    Nuclear safety in Europe is one of European Union's primary concerns, therefore the European Union decided to take a prominent role to help the New Independent States and countries of Central and Eastern Europe to ensure the safety of their nuclear reactors. The European Union TACIS and PHARE programmes in nuclear safety have been undertaken since 1990. The European Commission's Directorate General External Relations (EC DG RELEX) and, Directorate General Europe Aid Co-operation Office (EC DG AIDCO), are responsible for programming and management of implementation of TACIS projects. Directorate General Enlargement (EC DG ELARG) is responsible for programming PHARE programmes, but implementation of most projects has been decentralised since 1999 budget year to the Beneficiary countries. DG ELARG acts as backstopping for the relevant EC Delegations. In these activities, the TSSTP Unit at the JRC/IE in Petten, The Netherlands, is a technical and scientific adviser of DG RELEX and DG AIDCO and provides support to DG ELARG for very specific technical issues. Several PHARE projects aiming at improving nuclear safety have been successfully implemented for a number of plants from Central and Eastern Europe. In some cases major safety issues have been addressed by means of multi-country projects and results have been disseminated to the rest of the nuclear community. Although a lot of information has been exchanged at a bilateral level, further effort is needed to collect the project results in a systematic way and make them available by means of the internet. At present the TSSTP Unit is implementing two projects for dissemination of PHARE project results. This activity will take a better advantage of today's communication technologies and ensure the management of the acquired knowledge through preservation and user-friendly access and retrieval of the project results. The paper provides an outline of the TSSTP Unit relevant knowledge preservation initiative, a description

  19. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  20. Surveys of research projects concerning nuclear facility safety, financed by the Federal Ministry of the Interior

    International Nuclear Information System (INIS)

    1986-05-01

    Each progress report is a collection of individual reports, categorized by subject matter. They are a documentation of the contractor's progress, rendered by themselves on standardized forms, published, for the sake of general information on progress made in investigations concerning reactor safety, by the project attendance department of the GRS. The individual reports have serial numbers. Each report includes particulars of the objective, work carried out, results obtained and plans for project continuation. (orig./HP) [de

  1. Annual report on reactor safety research projects. Reporting period 2013. Progress report

    International Nuclear Information System (INIS)

    2013-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  2. Annual report on reactor safety research projects. Reporting period 2011. Progress report

    International Nuclear Information System (INIS)

    2011-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  3. Annual report on reactor safety research projects. Reporting period 2014. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. lt has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  4. Annual report on reactor safety research projects. Reporting period 2015. Progress report

    International Nuclear Information System (INIS)

    2015-01-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft tor Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are ·' prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. it has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  5. Overview of the NKS/RAK-1 project 'Strategies for reactor safety' and linkages to piping reliability studies

    International Nuclear Information System (INIS)

    Andersson, Kjell

    1997-01-01

    The NKS/RAK-1 project forms part of a four-year research program (1994-97) in the Nordic countries. The general objective of NKS/RAK-1 project is to explore strategies for reactor safety: to investigate and evaluate the safety work, to increase realism and reliability of safety analysis; and to increase the safety of nuclear installations in selected areas. The project has done extensive interview work at utilities and authorities, and analysed a number of case studies. Brief highlights and overviews of the sub-projects are presented in this paper

  6. The STRIVE-ONR Project: Stress Resistance in Virtual Environments

    Science.gov (United States)

    2015-07-29

    from the Virtual Iraq/Afghanistan Virtual Reality Exposure Therapy (VRET) system at the University of Southern California Institute for Creative...better sense of health outcomes; that is, "how the social environment exerts a cumulative impact on the physical and mental well being of individuals...levels with functional decline in elderly men and women. Geriatrics & gerontology international, 9 3, 282-289. Goldman, N., Turra, C. M., Glei, D

  7. Nuclear emergency preparedness. Final report of the Nordic nuclear safety research project BOK-1

    Energy Technology Data Exchange (ETDEWEB)

    Lauritzen, Bent [Risoe National Lab., Roskilde (Denmark)

    2002-02-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, 'Nuclear Emergency Preparedness', was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects: Laboratory measurements and quality assurance (BOK-1.1); Mobile measurements and measurement strategies (BOK-1.2); Field measurement and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in the Nordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project outline, objectives and organization are described and main results presented. (au)

  8. Nuclear emergency preparedness. Final report of the Nordic nuclear safety research project BOK-1

    International Nuclear Information System (INIS)

    Lauritzen, Bent

    2002-02-01

    Final report of the Nordic Nuclear Safety Research project BOK-1. The BOK-1 project, 'Nuclear Emergency Preparedness', was carried out in 1998-2001 with participants from the Nordic and Baltic Sea regions. The project consists of six sub-projects: Laboratory measurements and quality assurance (BOK-1.1); Mobile measurements and measurement strategies (BOK-1.2); Field measurement and data assimilation (BOK-1.3); Countermeasures in agriculture and forestry (BOK-1.4); Emergency monitoring in the Nordic and Baltic Sea countries (BOK-1.5); and Nuclear exercises (BOK-1.6). For each sub-project, the project outline, objectives and organization are described and main results presented. (au)

  9. The work environment and empowerment as predictors of patient safety culture in Turkey.

    Science.gov (United States)

    Dirik, Hasan Fehmi; Intepeler, Seyda Seren

    2017-05-01

    As scant research based information is available regarding the work environment, empowerment and patient safety culture, this study from a developing country (Turkey) in which health care institutions are in a state of transition, aimed to investigate further the relationships between these three variables. A cross-sectional descriptive design was employed. The sample comprised 274 nurse participants working in a university hospital located in Izmir (Turkey). In data evaluation, descriptive statistics and hierarchical regression analyses were applied. The work environment and structural empowerment were related to the patient safety culture and explained 55% of the variance in patient safety culture perceptions. 'Support for optimal patient care', 'nurse/physician relationships' and 'staff involvement in organisational affairs' were the significant predictors. An enhancement of the work environment and providing access to empowerment structures may help health care organisations improve the patient safety culture. In light of the findings, the following actions can be recommended to inform health care leaders: providing necessary resources for nursing practise, encouraging nurses' participation in decision-making, strengthening communication within the team and giving nurses the opportunities to cope with challenging work problems to learn and grow. © 2017 John Wiley & Sons Ltd.

  10. Safety and Environment aspects of Tokamak- type Fusion Power Reactor- An Overview

    Science.gov (United States)

    Doshi, Bharat; Reddy, D. Chenna

    2017-04-01

    Naturally occurring thermonuclear fusion reaction (of light atoms to form a heavier nucleus) in the sun and every star in the universe, releases incredible amounts of energy. Demonstrating the controlled and sustained reaction of deuterium-tritium plasma should enable the development of fusion as an energy source here on Earth. The promising fusion power reactors could be operated on the deuterium-tritium fuel cycle with fuel self-sufficiency. The potential impact of fusion power on the environment and the possible risks associated with operating large-scale fusion power plants is being studied by different countries. The results show that fusion can be a very safe and sustainable energy source. A fusion power plant possesses not only intrinsic advantages with respect to safety compared to other sources of energy, but also a negligible long term impact on the environment provided certain precautions are taken in its design. One of the important considerations is in the selection of low activation structural materials for reactor vessel. Selection of the materials for first wall and breeding blanket components is also important from safety issues. It is possible to fully benefit from the advantages of fusion energy if safety and environmental concerns are taken into account when considering the conceptual studies of a reactor design. The significant safety hazards are due to the tritium inventory and energetic neutron fluence induced activity in the reactor vessel, first wall components, blanket system etc. The potential of release of radioactivity under operational and accident conditions needs attention while designing the fusion reactor. Appropriate safety analysis for the quantification of the risk shall be done following different methods such as FFMEA (Functional Failure Modes and Effects Analysis) and HAZOP (Hazards and operability). Level of safety and safety classification such as nuclear safety and non-nuclear safety is very important for the FPR (Fusion

  11. Evaluating Students' Perceptions and Attitudes toward Computer-Mediated Project-Based Learning Environment: A Case Study

    Science.gov (United States)

    Seet, Ling Ying Britta; Quek, Choon Lang

    2010-01-01

    This research investigated 68 secondary school students' perceptions of their computer-mediated project-based learning environment and their attitudes towards Project Work (PW) using two instruments--Project Work Classroom Learning Environment Questionnaire (PWCLEQ) and Project Work Related Attitudes Instrument (PWRAI). In this project-based…

  12. Substantiation of the safety in the technical project of Belene NPP

    International Nuclear Information System (INIS)

    Boyadzhiev, A.

    1990-01-01

    The chapter contains an evaluation of the safety of Belene NPP project, based on an experts study of the corresponding volume of the Technical Project documentation of the main contractor and also on other related documents. The authors state that most of the remarks are constitutive, part of them requiring additional information or research. The general explicit conclusion is that the materials on the safety substantiation provided in the project are insufficient for making final statements on the safety of the NPP and there is a need for a detailed analysis and expertise. There are 12 topical conclusion paragraphs and each of them comprises a number of remarks. Among the remarks there are some related to the reactivity coefficient values in certain modes of operation, the problem of the mechanical safety and control system efficiency, the unacceptable operation at nominal power in case of stringent safety rules enforcement, the insufficiency of the PSA, the automatic control systems and the software codes not standing up to the contemporary requirements. (R.Ts.)

  13. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  14. Bridging the Divide between Safety and Risk Management for your Project or Program

    Science.gov (United States)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  15. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Science.gov (United States)

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... motor carriers that applied to participate in the Agency's long-haul pilot program to test and... intent to proceed with the initiation of a United States- Mexico cross-border long-haul trucking pilot...

  16. Enabling remote access to projects in a large collaborative environment

    International Nuclear Information System (INIS)

    Pais, V.F.; Balme, S.; Akpangny, H.S.; Iannone, F.; Strand, P.

    2010-01-01

    In the context of the Integrated Tokamak Modelling Task Force, a large number of software projects are made available to the task force members, including developers and end-users. This has been achieved through a combination of tools and technologies. The front-end is represented by a Java based portal system exposing a PHP project management system, GForge. These two applications are linked by a single sign-on mechanism, Shibboleth , and through secure HTTP request rewriting, where appropriate. Furthermore, the underlying storage facility is an OpenAFS distributed file system and the user base comes from both a network information server and an LDAP directory. Security mechanisms are those of a distributed system, with multiple access points and protocols used for reading and writing data. The present paper presents the challenges of integrating these different technologies and programming languages into a single, working, application presented to its users as a web portal. Chaining of the tools is explored through the user perspective, with an in-depth overview of the background transitions between the various systems involved with regard to security requirements for the front-end nodes and the policies as seen by the users.

  17. Enabling remote access to projects in a large collaborative environment

    Energy Technology Data Exchange (ETDEWEB)

    Pais, V. [INFLPR National Institute for Laser, Plasma and Radiation Physics, Magurele (Romania); Balme, S. [CEA Cadarache, IRFM, 13 - Saint-Paul-lez-Durance (France); Iannonec, F. [Associazione EURATOM-ENEA sulla Fusione, Frascati (Italy); Strand, P. [Department of Radio and Space Science, Chalmers University of Technology, Goteborg (Sweden)

    2009-07-01

    In the context of the Integrated Tokamak Modeling Task Force, a large number of software projects are made available to the task force members, including developers and end-users. This has been achieved through a combination of tools and technologies. The front-end is represented by a Java based portal system exposing a PHP project management system, Gforge. These two applications are linked by a single sign-on mechanism, Shibboleth, and through secure HTTP request rewriting, where appropriate. Furthermore, the underlying storage facility is an OpenAFS distributed file system and the user base comes from both a network information server and an LDAP directory. Security mechanisms are those of a distributed system, with multiple access points and protocols used for reading and writing data. This document presents the challenges of integrating these different technologies and programming languages into a single, working, application presented to its users as a web portal. The chaining of the tools is explored through the user perspective, with an in-depth overview of the background transitions between the various systems involved with regard to security requirements for the front-end nodes and the policies as seen by the users. This document is composed of a poster and its abstract. (authors)

  18. Enabling remote access to projects in a large collaborative environment

    Energy Technology Data Exchange (ETDEWEB)

    Pais, V.F., E-mail: pvf2005@gmail.co [Laser Department, National Institute for Laser, Plasma and Radiation Physics, P.O. Box MG-36, Bucharest 077125, Association EURATOM/MEdC (Romania); Balme, S.; Akpangny, H.S. [Association EURATOM CEA/IRFM CEA-Cadarache (France); Iannone, F. [Associazione EURATOM-ENEA sulla Fusione, C.R.ENEA Frascati, via E.Fermi 45, 00044 Frascati, Rome (Italy); Strand, P. [Department of Radio and Space Science, Chalmers University of Technology, SE-412 96 Goteborg (Sweden)

    2010-07-15

    In the context of the Integrated Tokamak Modelling Task Force, a large number of software projects are made available to the task force members, including developers and end-users. This has been achieved through a combination of tools and technologies. The front-end is represented by a Java based portal system exposing a PHP project management system, GForge. These two applications are linked by a single sign-on mechanism, Shibboleth , and through secure HTTP request rewriting, where appropriate. Furthermore, the underlying storage facility is an OpenAFS distributed file system and the user base comes from both a network information server and an LDAP directory. Security mechanisms are those of a distributed system, with multiple access points and protocols used for reading and writing data. The present paper presents the challenges of integrating these different technologies and programming languages into a single, working, application presented to its users as a web portal. Chaining of the tools is explored through the user perspective, with an in-depth overview of the background transitions between the various systems involved with regard to security requirements for the front-end nodes and the policies as seen by the users.

  19. Safety criteria for the future LMFBR's in France and main safety issues for the rapide 1500 project

    International Nuclear Information System (INIS)

    Justin, F.; Natta, M.; Orzoni, G.

    1985-04-01

    The main safety criteria for future LMFBR in France and the related issues for the RAPIDE 1500 project are presented and discussed. The evolutions with respect to SUPERPHENIX options and requirements are emphasized, in particular for the concerns of the prevention of core melt accidents, fuel damage limits and related required performances of the protection system, since one main option is not to consider whole core melt accidents in the containment design. One shall also point out the advantages of some mitigating features which were nevertheless added in the containment design, although without any explicit consideration for core melt accidents

  20. AEA Technology report on safety and the environment 1991/92

    International Nuclear Information System (INIS)

    1992-01-01

    Safety management has been a key activity for AEA throughout our history. This will continue to be the case as our commercial strategy is developed to meet the needs of our customers. The provision of high quality service is central to AEA's objectives - and safety is an important part of our quality management system. This report describes AEA's safety arrangements and performance over the last year. The considerable resources which we have devoted to radiological protection - and increasingly to general industrial safety matters - show that we have a good record in managing the safety of our employees and of the public. We set objectives and targets consistent with our aim to have a demonstrably high level of safety performance. This report also highlights our commitment to protection of the environment. The careful attention which we have paid for many years to limiting the environmental effects of our radiological operations has been broadened to a more generally based environmental protection policy. AEA is pleased to be associated - both in regard to our own operations and as a supplier of consultancy services in environmental protection - with the increasing efforts made in this area by the business world. (UK)

  1. The International Science and Technology Center (ISTC) and ISTC projects related to nuclear safety. Information review

    International Nuclear Information System (INIS)

    Tocheny, Lev V.

    2003-01-01

    The ISTC is an intergovernmental organization created ten years ago by Russia, USA, EU and Japan in Moscow. The Center supports numerous science and technology projects in different areas, from biotechnologies and environmental problems to all aspects of nuclear studies, including those focused on the development of effective innovative concepts and technologies in the nuclear field, in general, and for improvement of nuclear safety, in particular. The presentation addresses some technical results of the ISTC projects as well as methods and approaches employed by the ISTC to foster close international collaboration and manage projects towards fruitful results. (author)

  2. Severe accident assessment. Results of the reactor safety research project VAHTI

    International Nuclear Information System (INIS)

    Sairanen, R.

    1997-10-01

    The report provides a summary of the publicly funded nuclear reactor safety research project Severe Accident Management (VAHTI). The project has been conducted at the Technical Research Centre of Finland (VTT) during the years 1994-96. The main objective was to assist the severe accident management programmes of the Finnish nuclear power plants. The project was divided into five work packages: (1) thermal hydraulic validation of the APROS code, (2) core melt progression within a BWR pressure vessel, (3) failure mode of the BWR pressure vessel, (4) Aerosol behaviour experiments, and (5) development of a computerized severe accident training tool

  3. I and C safety research at the OECD Halden reactor project

    International Nuclear Information System (INIS)

    Gran, B.A.

    2007-01-01

    The overall objective of the Halden Reactor Project research on software systems dependability is to contribute to the successful introduction of digital I and C systems into NPPs. When celebrating the 50 years of the Halden Project in 2008, about 100 written reports have been delivered within this research. This research covers a number of topics covering safety, reliability, validation and verification, quality assurance, risk assessment, requirement engineering, error propagation, qualitative and quantitative assessment. In the paper some activities are described, pinpointing the importance of good joint projects with organisations in the member countries

  4. Marine radioecology. Final reports from sub-projects within the Nordic nuclear safety research project EKO-1

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2001-04-01

    This report contains a collection of eight papers describing research done in the NKS/EKO-1 project. It also contains a preface giving a summary of the results. The EKO-1 project as a whole has been described in the report NKS(97)FR4. The aim of the project was to make a joint Nordic study on radionuclides in sediments and water and the interaction between these two phaseS. Relatively less emphasis had been put on this factor compared to others in previous Nordic studies on marine radioecology. For some of the participating countries this work was the first of its kind undertaken. The project involved field, laboratory and model studies. The work and results helped to highlight the important role of sediments when assessing the consequences of real or possible releases of radionuclides to the marine environment (au)

  5. Qualification of integrated tool environments (QUITE) for the development of computer-based safety systems in NPP

    International Nuclear Information System (INIS)

    Miedl, Horst

    2004-01-01

    In NPP I et C systems are back fitted meanwhile increasingly by computer-based systems (I et C platforms). The corresponding safety functions are implemented by software, and this software is developed, configured and administrated with the help of integrated tool environments (ITE). An ITE offers a set of services which are used to construct an I et C system and consist typically of software packages for project control and documentation, specification and design, automatic code generation and so on. Commercial ITE are not necessarily conceived and qualified (type-tested) for nuclear specific applications but are used - and will increasingly be used - for the implementation of nuclear safety related I et C systems. Therefor, it is necessary to qualify commercial ITE with respect to their influence on the quality of the target system for each I et C platform (dependent on the safety category of the target system). Examples for commercial ITEs are I et C platforms like SPINLINE 3, TELEPERM XP, Common Q, TRICON, etc. (Author)

  6. Responsible management for Health, Safety and Environment (HSE) in uranium mining and processing, starting from public support

    International Nuclear Information System (INIS)

    Saint-Pierre, S.

    2014-01-01

    Seeking, gaining and maintaining public support is inherent to mining and to responsible management in this sector. In particular, it holds special relevance for remote mining sites for which the buy in from the regional and local workforce and populations is a necessity all along the life span of a mining project from exploration to development, commissioning, operation, closure and restoration. This paper briefly highlights some key features to be accounted for nowadays for the successful development, shaping and implementation of mining projects with a view to improve public support. It is essential to address responsible management for health, safety and environment (HSE) in uranium mining and processing through key program elements such as policy; baseline; operational preparation for implementation; monitoring, reporting, review and continued improvements; as well as some insights on site closure and restoration. In particular, examples illustrate how these program elements are implemented in practice in uranium mining and processing. Some emphasis is put on radiation safety as responsible management for the other HSE dimensions tends to be analogous for all mines and mineral processing sites. (author)

  7. Sustainable development criteria for Built Environment projects in South Africa (CSIR)

    CSIR Research Space (South Africa)

    Gibberd, Jeremy T

    2010-01-01

    Full Text Available This paper is based on work undertaken for the Gauteng Department of Agriculture and Rural Development (GDARD) developing a set of sustainable development criteria for built environment projects requiring environmental impact assessments. (Gibberd...

  8. Classroom Environment in the Implementation of an Innovative Curriculum Project in Science Education.

    Science.gov (United States)

    Suarez, Mercedes; Pias, Rosa; Membiela, Pedro; Dapia, Dolores

    1998-01-01

    Analyzes the perceptions of students, teachers, and external observers in order to study the influence of classroom environment on the implementation of an innovative project in science education. Contains 33 references. (DDR)

  9. Toward Project-based Learning and Team Formation in Open Learning Environments

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2014-01-01

    Open Learning Environments, MOOCs, as well as Social Learning Networks, embody a new approach to learning. Although both emphasise interactive participation, somewhat surprisingly, they do not readily support bond creating and motivating collaborative learning opportunities. Providing project-based

  10. The radiological impact of the LEP project on the environment

    International Nuclear Information System (INIS)

    Goebel, K.

    1981-01-01

    The siting of the large electron-positron (LEP) accelerator, its experimental areas, and its supporting infrastructure are discussed with respect to the radiological impact on the surrounding areas and on the population in the Pays de Gex and the Canton de Geneve. The final conclusions are based on work done by the former LEP Study Group and by the LEP Radiation Working Group. The calculations and estimates show that the stray ionizing radiation, the radioactivity, and the radiation-induced noxious chemical products released by the LEP installation will have only an insignificant impact on the area, the individual members of the public, and the population as a whole. This result for LEP 'phase 85' can also be extrapolated under reasonable assumptions for LEP 125 - a possible future development phase of the present project. (orig.)

  11. Development of a virtual research environment in ITBL project

    Energy Technology Data Exchange (ETDEWEB)

    Kenji, Higuchi; Takayuki, Otani; Yukihiro, Hasegawa; Yoshio, Suzuki; Nobuhiro, Yamagishi; Kazuyuki, Kimura; Tetsuo, Aoyagi; Norihiro, Nakajima; Masahiro, Fukuda [Japan Atomic Energy Research Institute (Japan); Toshiyuki, Imamura [University of Electro-Communications (Japan); Genki, Yagawa [Tokyo University (Japan)

    2003-07-01

    With the progress of computers and high-speed networks, it becomes possible to perform research work efficiently by combining computing, data and experimental resources which are widely distributed over multi-sites, or by sharing information among collaborators who belong to different organizations. An experimental application of Grid computing was executed in ITBL (information technology based laboratory) project promoted by six member institutes of MEXT (ministry of education, culture, sports, sciences and technology). Key technologies that are indispensable for construction of virtual organization were implemented onto ITBL Middle-ware and examined in the experiment from a view point of availability. It seems that successful result in the implementation and examination of those technologies such as security infrastructure, component programming and collaborative visualization in practical computer/network systems means significant progress in Science Grid in Japan.

  12. Development of a virtual research environment in ITBL project

    International Nuclear Information System (INIS)

    Kenji, Higuchi; Takayuki, Otani; Yukihiro, Hasegawa; Yoshio, Suzuki; Nobuhiro, Yamagishi; Kazuyuki, Kimura; Tetsuo, Aoyagi; Norihiro, Nakajima; Masahiro, Fukuda; Toshiyuki, Imamura; Genki, Yagawa

    2003-01-01

    With the progress of computers and high-speed networks, it becomes possible to perform research work efficiently by combining computing, data and experimental resources which are widely distributed over multi-sites, or by sharing information among collaborators who belong to different organizations. An experimental application of Grid computing was executed in ITBL (information technology based laboratory) project promoted by six member institutes of MEXT (ministry of education, culture, sports, sciences and technology). Key technologies that are indispensable for construction of virtual organization were implemented onto ITBL Middle-ware and examined in the experiment from a view point of availability. It seems that successful result in the implementation and examination of those technologies such as security infrastructure, component programming and collaborative visualization in practical computer/network systems means significant progress in Science Grid in Japan

  13. Main benefits from 30 years of joint projects in nuclear safety

    International Nuclear Information System (INIS)

    Thadani, Ashok; Teschendorff, Victor; Vitanza, Carlo; Hrehor, Miroslav

    2012-01-01

    One of the major achievements of the OECD Nuclear Energy Agency (NEA) is the knowledge it has helped to generate through the organisation of joint international research projects. Such projects, primarily in the areas of nuclear safety and radioactive waste management, enable interested countries, on a cost-sharing basis, to pursue research or the sharing of data with respect to particular areas or issues. Over the years, more than 30 joint projects have been conducted with wide participation of member countries. The purpose of this report is to describe the achievements of the OECD/NEA joint projects on nuclear safety research that have been carried out over the past three decades, with a particular focus on thermal-hydraulics, fuel behaviour and severe accidents. It shows that the resolution of specific safety issues in these areas has greatly benefited from the joint projects' activities and results. It also highlights the added value of international co-operation for maintaining unique experimental infrastructure, preserving skills and generating new knowledge

  14. IAEA TC Project 'Strengthening safety and reliability of fuel and materials in nuclear power plants'

    International Nuclear Information System (INIS)

    Makihara, Y.

    2008-01-01

    The Regional TC Project in Europe RER9076 'Strengthening Safety and Reliability of Fuel and Materials in Nuclear Power Plants' was launched in 2003 as a four-year project and was subsequently extended in 2006 to run through 2008. The purpose of the Project is to support the Central and Eastern European countries with the necessary tools to fulfill their own fuel and material licensing needs. The main objective will be to provide quality data on fuel and materials irradiated in power reactors and in dedicated experiments carried out in material test reactors (MTRs). Within the framework of the Project, ten tasks were implemented. These included experiments performed at the test facilities in the region, training courses and workshops related to fuel safety. While several tasks are expected to be completed by the end of RER9076, some remain. It would be desirable to initiate a new RER Project from the next TC cycle (2009-2011) in order to take over RER9076 and to implement new tasks required for enhancing fuel safety in the region. (author)

  15. Feedback from uncertainties propagation research projects conducted in different hydraulic fields: outcomes for engineering projects and nuclear safety assessment.

    Science.gov (United States)

    Bacchi, Vito; Duluc, Claire-Marie; Bertrand, Nathalie; Bardet, Lise

    2017-04-01

    In recent years, in the context of hydraulic risk assessment, much effort has been put into the development of sophisticated numerical model systems able reproducing surface flow field. These numerical models are based on a deterministic approach and the results are presented in terms of measurable quantities (water depths, flow velocities, etc…). However, the modelling of surface flows involves numerous uncertainties associated both to the numerical structure of the model, to the knowledge of the physical parameters which force the system and to the randomness inherent to natural phenomena. As a consequence, dealing with uncertainties can be a difficult task for both modelers and decision-makers [Ioss, 2011]. In the context of nuclear safety, IRSN assesses studies conducted by operators for different reference flood situations (local rain, small or large watershed flooding, sea levels, etc…), that are defined in the guide ASN N°13 [ASN, 2013]. The guide provides some recommendations to deal with uncertainties, by proposing a specific conservative approach to cover hydraulic modelling uncertainties. Depending of the situation, the influencing parameter might be the Strickler coefficient, levee behavior, simplified topographic assumptions, etc. Obviously, identifying the most influencing parameter and giving it a penalizing value is challenging and usually questionable. In this context, IRSN conducted cooperative (Compagnie Nationale du Rhone, I-CiTy laboratory of Polytech'Nice, Atomic Energy Commission, Bureau de Recherches Géologiques et Minières) research activities since 2011 in order to investigate feasibility and benefits of Uncertainties Analysis (UA) and Global Sensitivity Analysis (GSA) when applied to hydraulic modelling. A specific methodology was tested by using the computational environment Promethee, developed by IRSN, which allows carrying out uncertainties propagation study. This methodology was applied with various numerical models and in

  16. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  17. Re-designing project management : Steps towards a project management curriculum for a sustainable built environment

    NARCIS (Netherlands)

    Heintz, J.L.; Lousberg, L.H.M.J.; Prins, M.

    2015-01-01

    Sustainability concerns add a wide range of both stakeholders and performance expectations to building projects. The transition of a circular economy will also have a significant impact on the way in which building projects are carried out. This in addition to an already established escalation of

  18. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  19. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  20. Safety upgrading of Novi Han Repository under IAEA TC Project BUL/4/005 achievements and future plans

    International Nuclear Information System (INIS)

    Stefanova, I.

    2003-01-01

    The report presents the safety upgrading of the Novi Han Repository under the IAEA TC Project BUL/4/005. The Project covers: identification of radionuclide inventory; characterisation of the disposal vaults; site characterisation; safety assessment; upgrading of the monitoring and radiation control; selection of treatment and conditioning processes and a conceptual design for a new waste processing and storage facility and other direct measures for safety improvement. The current inventory is identified and presented in the report. Schemes of the vault for solid wastes and vault for biological wastes are given, demonstrating reinforced concrete, stainless steel lining, and hydro insulation are presented. Several studies for safety assessment are made between 1997 and 2003. The operational safety assessment for disposal in existing facilities gives the annual risk for: spilling of waste package during upload (7.58.10 -9 ); spilling of waste package in transport accident (2.90.10 -9 ); fire scenario (3.50.10 - 1 3 ); radionuclide release due to flooding or earthquake (5.05.10 -4 ). The monitoring radiation control is upgraded according to the regulatory guidance and covered the site, restricted zone (1 km) and supervised zone (5 km). The types of analyses made are: Direct measurement of the dose rate -TLD; Direct measurements of the dose rate - portable surveillance monitors; In situ gamma spectrometry; Gamma spectrometry; Gross beta, gross alpha; Liquid scintillation spectrometry. The analyses show no transfer od radionuclides to the environment. The individual radiation control shows no evidence for specific radiation pathology. The operational radiation control service premises and transport vehicles. The following is measured: gamma dose rate; beta exposure; alpha exposure; neutron radiation; contamination level. Under the development is a detailed technical design supply of equipment for characterization of waste, including hot cell for control over high level

  1. The Role of HSE management System in Improving health, safety and environment performance in an Oil Organization

    Directory of Open Access Journals (Sweden)

    SS. Alizadeh

    2006-10-01

    Full Text Available Background and aims   Nowadays, organisations: trying to utilize HSE system, To establish an appropriate system in the line of maintenance and promotion of healthy work environment without any accidents, injuries, and pollution.  HSE management system is a tool to control and improve the performance of health and safety  and environment in all development programs of industrial and other structural organizations. This is in fact an integrated system, so that all human financial and equipment resources will support each other to provide a healthy and convenience environment with no any accident and injuries.   Methods   In this case study all components of an HSE management system is review briefly and explain the role of this system in accident reduction rate and work efficiency in an oil company in the Persian Golf.Three years activities of HSE system in this company been studied, using all  reports and any related documents. Different variances as indicators had been defined with which  the annual performance of the HSE system, of the company have been evaluated.   Results   The results show that there are significant improvement in health, safety and environment during the period of 2001-2003 as HSE system implemented.  The rate of LTIF decreased from 0.69 in 2001 to 0.5 in 2003 or FAR decreased from 2.2 in 2001 to  0.7 in 2003, and the air pollution of SO 2 decreased from 397 T. in 2001 to 309T. in 2003.   Conclusion   This study indicated that although the number of employees, number of working hours and number of projects increased significantly during the years 2001 to 2003, but the rate of  different related indicators decreased such as LTIF, TRIR, FAR and pollutants like SO 2 , Co 2 , No  and CH4.

  2. US Department of Energy Environment, Safety and Health Progress Assessment of the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety, and Health (ES&H) Progress Assessment of the Nevada Test Site (NTS), Nye County, Nevada. The assessment, which was conducted from July 20 through August 4, 1992, included a selective review of the ES&H management systems and progress of the responsible DOE Headquarters Program Offices; the DOE Nevada Field Office (NV); and the site contractors. The ES&H Progress Assessments are part of the Secretary of Energy`s continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. This report presents a summary of issues and progress in the areas of environment, safety and health, and management.

  3. US Department of Energy Environment, Safety and Health Progress Assessment of the Nevada Test Site

    International Nuclear Information System (INIS)

    1992-08-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety, and Health (ES ampersand H) Progress Assessment of the Nevada Test Site (NTS), Nye County, Nevada. The assessment, which was conducted from July 20 through August 4, 1992, included a selective review of the ES ampersand H management systems and progress of the responsible DOE Headquarters Program Offices; the DOE Nevada Field Office (NV); and the site contractors. The ES ampersand H Progress Assessments are part of the Secretary of Energy's continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. This report presents a summary of issues and progress in the areas of environment, safety and health, and management

  4. Design and implementation of a safety health and environment management system in BHP Petroleum

    Energy Technology Data Exchange (ETDEWEB)

    Mattes, B.W.; Walters, C. [BHP Petroleum, Melbourne, VIC (Australia)

    1995-12-31

    The Australian/Asian operations group within BHP Petroleum (BHPP) is implementing and integrated management system with safety, occupational health and environmental elements as crucial components of all BHPP operations. Responsibility for the development, implementation and maintenance of the management system, and compliance with its provisions, rests with line management, a logical extension of the accountability and responsibility for safety, health and environment matters that rests with line managers within BHPP. Contractors are scrutinized to assess their safety, health and environmental performance and failure to meet minimal standards will result in their disqualification. The effectiveness of the BHPP Management System is yet to be fully determined, however, it will be measured against the performance of the company in the areas of zero lost time due to injuries, a drop in incidences requiring medical treatment or first aid, lower absenteeism and workers compensation bills, no oil spills, less car accidents, less back pain and RSI, better management of waste emissions to air, land and sea, and less equipment breakdowns. The trend in improved safety, health and environment performance are already apparent and auger well for the Company as it moves towards the new millennium. 7 figs., 2 photos., 4 refs.

  5. Study on the Key Indexes of Carambola Quality Safety under Logistics Environment of Different Temperature

    OpenAIRE

    Lei Wang; Ruhe Xie; Yifeng Zou

    2015-01-01

    By using layered factor analysis method, the key indexes of quality safety of Carambola are determined. The whole logistics process from picking, storing, transportation to selling is simulated in the experiment. At the same time, the key indexes are detected and analyzed under different temperature in logistics environment. The results indicate that both temperature and package have certain effect on the quality of Carambola. As shown in the study, the following conclusions are made. The tem...

  6. Peer Feedback to Facilitate Project-Based Learning in an Online Environment

    Science.gov (United States)

    Ching, Yu-Hui; Hsu, Yu-Chang

    2013-01-01

    There has been limited research examining the pedagogical benefits of peer feedback for facilitating project-based learning in an online environment. Using a mixed method approach, this paper examines graduate students' participation and perceptions of peer feedback activity that supports project-based learning in an online instructional design…

  7. Motivating Students to Develop Satellites in a Problem and Project-Based Learning Environment

    DEFF Research Database (Denmark)

    Larsen, Jesper Abildgaard; Nielsen, Jens Frederik Dalsgaard; Zhou, Chunfang

    2013-01-01

    During the last decade, a total of three student satellites have been developed by engineering students in a Problem and Project-Based Learning (PBL) environment at Aalborg University (AAU), Denmark. As solving such a complex project, we emphasize that a high level of motivation is needed for the...

  8. FY 1993 Ferrocyanide Tank Safety Project: Effects of Aging on Ferrocyanide Wastes test plan for the remainder of FY 1993

    International Nuclear Information System (INIS)

    Lilga, M.A.; Schiefelbein, G.F.

    1993-06-01

    Researchers in the Hanford Ferrocyanide Task Team are studying safety issues associated with ferrocyanide precipitates in single shell waste storage tanks (SST). Ferrocyanide is a stable complex of ferrous, ion and cyanide ion that is considered nontoxic because it does not dissociate readily in aqueous solutions. However, in the laboratory at temperatures in excess of 180 degrees C and in the presence of oxidizers such as nitrates and nitrites, dry ferrocyanide and ferrocyanide waste stimulants can be made to react exothermically. The Ferrocyanide Safety Project at the Pacific Northwest Laboratory (PNL) is part of the Waste Tank Safety Program at Westinghouse Hanford Company (WHC). The purpose of the WHC program is to (1) maintain the ferrocyanide tanks with minimal risk of an accident, (2) select one or more strategies to assure safe storage, and (3) close out the unreviewed safety question (USQ). Tank ferrocyanide wastes were exposed to highly alkaline wastes from subsequent processing operations. Chemical reactions with caustic may have changed the ferrocyanide materials during 40 years of storage in the SSTs. Research in the open-quotes Effects of Aging on Ferrocyanide Wastesclose quotes task is targeted at studying aging of ferrocyanide tank simulants and other ferrocyanide materials to obtain a better understanding of how tank materials may have changed over the years. The research objective in this project is to determine the solubility and hydrolysis characteristics of simulated ferrocyanide tank wastes in alkaline media. The behavior of ferrocyanide simulant wastes is being determined by performing chemical reactions under conditions that might mimic the potential ranges in SST environments. Experiments are conducted at high pH, at high ionic strength, and in the presence of gamma radiation. Verification of simulant study findings by comparison with results with actual waste will also be required

  9. Use of OECD/NEA Data Project Products in Probabilistic Safety Assessment

    International Nuclear Information System (INIS)

    Cherkas, G.; Raducu, Gheorghe; Riznic, J.; Yalaoui, S.; Huang, Hui-Wen; Holy, Jaroslav; Holmberg, Jan-Erik; Sandberg, Jorma; Balmain, Michel; Bonnevialle, Anne-Marie; Curnier, Florence; Georgescu, Gabriel; Lanore, Jeanne-Marie; Lindner, Arndt; Fujimoto, Haruo; Ahn, Kwang-Il; Hwang, Taesuk; Jang, Seung-Cheol; Husarcek, Jan; Kovacs, Zoltan; Vazquez, Teresa; Johanson, Gunnar; Liwaang, Bo; Nyman, Ralph; Dang, Vinh; Schoen, Gerhard; Brook, Kevin; Hamblen, David; Siu, Nathan; Sturzebecher, Karl; Tobin, Margaret; Wood, Jeff; Amri, Abdallah; Breest, Axel

    2014-01-01

    The Nuclear Energy Agency (NEA)/Committee for the Safety of Nuclear Installations' (CSNI) Working Group on Risk Assessment (WGRISK) is tasked with supporting the improved use of Probabilistic Safety Assessment (PSA) in risk informed regulation and safety management through the analysis of results and the development of perspectives regarding potentially important risk contributors and associated risk reduction strategies. The task consists of the following major activities: Development, distribution, and completion of survey questionnaires; Analysis of survey questionnaire results at a task workshop; Preparation of the final task report. The main objectives of this task, as proposed by WGRISK and approved by CSNI, are the following: - Identification and characterization of the current uses of OECD data project products and data in support of PSA. In this context, the term 'products' refers to data analysis results, technical reports, and other project outputs. - Identification and characterization of technical and programmatic characteristics that either support or impede use of data project products in PSA. This includes an assessment of which PSA parameters could be potentially estimated from the various data project products and gaps between available product information and PSA data needs. - Identification of recommendations for enhancing the usefulness of data project products and the coordination between WGRISK and the data projects. This task report consists of the following sections: - Chapter 1 Provides a general overview of motivation and approach used for this task. - Chapter 2 Describes scope and objectives of the task. - Chapter 3 Provides an overview of the ICDE, FIRE, OPDE/CODAP, and COMPSIS data projects. For each project, the project objectives, project history, data collection methodology and quality assurance, project status, example PSA Applications, and information related to project participation is provided. - Chapter 4 Describes the

  10. Feasibility of groundwater recharge dam projects in arid environments

    Science.gov (United States)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  11. Web Environments for Group-Based Project Work in Higher Education

    NARCIS (Netherlands)

    Andernach, J.A.; van Diepen, N.M.; Collis, Betty; Andernach, Toine

    1997-01-01

    We discuss problems confronting the use of group-based project work as an instructional strategy in higher education and describe two courses in which course-specific World Wide Web (Web) environments have evolved over a series of course sequences and are used both as tool environments for

  12. Exploring health, safety and environment in central and Eastern Europe: an introduction to the European Centre for Occupational Health, Safety and the Environment (ECOHSE).

    Science.gov (United States)

    Beck, M; Robson, M; Watterson, A; Woolfson, C

    2001-01-01

    This article traces the development of the European Centre for Occupational Health, Safety and the Environment (ECOHSE) at the University of Glasgow. ECOHSE recently has been designated a Thematic Network by the European Union which is providing administrative support through 2004. The de facto de-regulation that accompanied emergent capitalism in Eastern Europe created opportunities for exploitation of the work force. Voluntary efforts of a loose network of occupational and environmental health academics led to a series of yearly conferences to discuss these problems and the lack of research about them. Then, in 1999, a more formal organization was established at Glasgow to pursue continuity and funding. The first occupational and environmental health conference under ECOHSE was held last year in Lithuania, and selected presentations of that meeting are offered in this journal. A second ECOHSE conference will be held this fall in Romania.

  13. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  14. Project Guarantee 1985. Final repository for high-level radioactive wastes: The system of safety barriers

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    Final disposal of radioactive waste involves preventing the waste from returning from the repository location into the biosphere by means of successively arranged containment measures known as safety barriers. In the present volume NGB 85-04 of the series of reports for Project 'Guarantee' 1985, the safety barrier system for the type C repository for high-level waste is described. The barrier parameters which are relevant for safety analysis are quantified and associated error limits and data scatter are given. The aim of the report is to give a summary documentation of the safety analysis input data and their scientific background. For secure containment of radioactive waste safety barriers are used which effectively limit the release of radioactive material from the repository (release barriers) and effectively retard the entry of the original radioactive material into the biosphere (time barriers). Safety barriers take the form of both technically constructed containment measures and the siting of the repository in suitable geological formations. The technical safety barrier system in the case of high-level waste comprises: the waste solidification matrix (borosilicate glass), massive steel canisters, encasement of the waste canisters, encasement of the waste canisters in highly compacted bentonite, sealing of vacant storage space and access routes on repository closure. The natural geological safety barriers - the host rock and overlying formations provide sufficiently long deep groundwater flow times from the repository location to the earth's surface and for additional lengthening of radionuclide migration times by means of various chemical and physical retardation mechanisms. The stability of the geological formations is so great that hydrogeological system is protected for a sufficient length of time from deterioration caused, in particular, by erosion. Observations in the final section of the report indicate that input data for the type C repository safety

  15. Safety Assessment Methodologies and Their Application in Development of Near Surface Waste Disposal Facilities--ASAM Project

    International Nuclear Information System (INIS)

    Batandjieva, B.; Metcalf, P.

    2003-01-01

    Safety of near surface disposal facilities is a primary focus and objective of stakeholders involved in radioactive waste management of low and intermediate level waste and safety assessment is an important tool contributing to the evaluation and demonstration of the overall safety of these facilities. It plays significant role in different stages of development of these facilities (site characterization, design, operation, closure) and especially for those facilities for which safety assessment has not been performed or safety has not been demonstrated yet and the future has not been decided. Safety assessments also create the basis for the safety arguments presented to nuclear regulators, public and other interested parties in respect of the safety of existing facilities, the measures to upgrade existing facilities and development of new facilities. The International Atomic Energy Agency (IAEA) has initiated a number of research coordinated projects in the field of development and improvement of approaches to safety assessment and methodologies for safety assessment of near surface disposal facilities, such as NSARS (Near Surface Radioactive Waste Disposal Safety Assessment Reliability Study) and ISAM (Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities) projects. These projects were very successful and showed that there is a need to promote the consistent application of the safety assessment methodologies and to explore approaches to regulatory review of safety assessments and safety cases in order to make safety related decisions. These objectives have been the basis of the IAEA follow up coordinated research project--ASAM (Application of Safety Assessment Methodologies for Near Surface Disposal Facilities), which will commence in November 2002 and continue for a period of three years

  16. Effect of Practice Ownership on Work Environment, Learning Culture, Psychological Safety, and Burnout.

    Science.gov (United States)

    Cuellar, Alison; Krist, Alex H; Nichols, Len M; Kuzel, Anton J

    2018-04-01

    Physicians have joined larger groups and hospital systems in the face of multiple environmental challenges. We examine whether there are differences across practice ownership in self-reported work environment, a practice culture of learning, psychological safety, and burnout. Using cross-sectional data from staff surveys of small and medium-size practices that participated in EvidenceNOW in Virginia, we tested for differences in work environment, culture of learning, psychological safety, and burnout by practice type. We conducted weighted multivariate linear regression of outcomes on ownership, controlling for practice size, specialty mix, payer mix, and whether the practice was located in a medically underserved area. We further analyzed clinician and staff responses separately. Participating were 104 hospital-owned and 61 independent practices and 24 federally qualified health centers (FQHCs). We analyzed 2,005 responses from practice clinicians and staff, a response rate of 49%. Working in a hospital-owned practice was associated with favorable ratings of work environment, psychological safety, and burnout compared with independent practices. When we examined separately the responses of clinicians vs staff, however, the association appears to be largely driven by staff. Hospital ownership was associated with positive perceptions of practice work environment and lower burnout for staff relative to independent ownership, whereas clinicians in FQHCs perceive a more negative, less joyful work environment and burnout. Our findings are suggestive that clinician and nonclinician staff perceive practice adaptive reserve differently, which may have implications for creating the energy for ongoing quality improvement work. © 2018 Annals of Family Medicine, Inc.

  17. Radiation Safety Management Guidelines for PET-CT: Focus on Behavior and Environment

    International Nuclear Information System (INIS)

    Jung, Jin Wook; Han, Eun Ok

    2011-01-01

    Our purpose is to specify behavior and environmental factors aimed at reducing the exposed dosage caused by PET-CT and to develop radiation safety management guidelines adequate for domestic circumstances. We have used a multistep-multimethod as the methodological approach to design and to carry out the research both in quality and quantity, including an analysis on previous studies, professional consultations and a survey. The survey includes responses from 139 practitioners in charged of 109 PET-CTs installed throughout Korea(reported by the Korean Society of Nuclear Medicine, 2010). The research use 156 questions using Cronbach's α (alpha) coefficients which were: 0.818 for 'the necessity of setting and installing the radiation protective environment'; 0.916 for 'the necessity of radiation protection', 'setting and installing the radiation protective environment'; and 0.885 for 'radiation protection'. The check list, derived from the radiation safety management guidelines focused on behavior and environment, was composed of 20 items for the radiation protective environment: including 5 items for the patient; 4 items for the guardian; 3 items for the radiologist; and 8 items applied to everyone involved; for a total of 26 items for the radiation protective behavior including: 12 items for the patient; 1 item for the guardian, 7 items for the radiologist; and 6 items applied to everyone involved. The specific check list is shown in (Table 5-6). Since our country has no safety management guidelines of its own to reduce the exposed dosage caused by PET-CTs, we believe the guidelines developed through this study means great deal to the field as it is not only appropriate for domestic circumstances, but also contains specific check lists for each target who may be exposed to radiation in regards to behavior and environment.

  18. The IAEA research project on improvement of safety assessment methodologies for near surface disposal facilities

    International Nuclear Information System (INIS)

    Torres-Vidal, C.; Graham, D.; Batandjieva, B.

    2002-01-01

    The International Atomic Energy Agency (IAEA) Research Coordinated Project on Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities (ISAM) was launched in November 1997 and it has been underway for three years. The ISAM project was developed to provide a critical evaluation of the approaches and tools used in long-term safety assessment of near surface repositories. It resulted in the development of a harmonised approach and illustrated its application by way of three test cases - vault, borehole and Radon (a particular range of repository designs developed within the former Soviet Union) type repositories. As a consequence, the ISAM project had over 70 active participants and attracted considerable interest involving around 700 experts from 72 Member States. The methodology developed, the test cases, the main lessons learnt and the conclusions have been documented and will be published in the form of an IAEA TECDOC. This paper presents the work of the IAEA on improvement of safety assessment methodologies for near surface waste disposal facilities and the application of these methodologies for different purposes in the individual stages of the repository development. The paper introduces the main objectives, activities and outcome of the ISAM project and summarizes the work performed by the six working groups within the ISAM programme, i.e. Scenario Generation and Justification, Modelling, Confidence Building, Vault, Radon Type Facility and Borehole test cases. (author)

  19. The application of integrated safety management principles to the Tritium Extraction Facility project

    International Nuclear Information System (INIS)

    Hickman, M.O.; Viviano, R.R.

    2000-01-01

    The DOE has developed a program that is accomplishing a heightened safety posture across the complex. The Integrated Safety Management (ISM) System (ISMS) program utilizes five core functions and seven guiding principles as the basis for implementation. The core functions define the work scope, analyze the hazards, develop and implement hazard controls, perform the work, and provide feedback for improvement. The guiding principles include line management responsibility, clear roles and responsibilities, competence per responsibilities, identification of safety standards/requirements, tailored hazard control, balanced priorities, and operations authorization. There exists an unspecified eighth principle, that is, worker involvement. A program requiring the direct involvement of the employees who are actually performing the work has been shown to be quite an effective method of communicating safety requirements, controlling work in a safe manner, and reducing safety violations and injuries. The Tritium Extraction Facility (TEF) projects, a component of the DOE's Commercial Light Water Reactor Tritium Production program, has taken the ISM principles and core functions and applied them to the project's design. The task of the design team is to design a facility and systems that will meet the production requirements of the DOE tritium mission as well as a design that minimizes the workers' exposure to adverse safety situations and hazards/hazardous materials. During the development of the preliminary design for the TEF, design teams consisted of not only designers but also personnel who had operational experience in the existing tritium and personnel who had operational experience in the existing tritium and personnel who had specialized experience from across the DOE complex. This design team reviewed multiple documents associated with the TEF operation in order to identify and document the hazards associated with the tritium process. These documents include hazards

  20. Grassroots projects aimed at the built environment: Association with neighbourhood deprivation, land-use mix and injury risk to road users.

    Science.gov (United States)

    Dubé, Anne Sophie; Beausoleil, Maude; Gosselin, Céline; Beaulme, Ginette; Paquin, Sophie; Pelletier, Anne; Goudreau, Sophie; Poirier, Marie-Hélène; Drouin, Louis; Gauvin, Lise

    2014-07-09

    1) To describe grassroots projects aimed at the built environment and associated with active transportation on the Island of Montreal; and 2) to examine associations between the number of projects and indicators of neighbourhood material and social deprivation and the built environment. We identified funding agencies and community groups conducting projects on built environments throughout the Island of Montreal. Through website consultation and a snowballing procedure, we inventoried projects that aimed at transforming built environments and that were carried out by community organizations between January 1, 2006, and November 1, 2010. We coded and validated information about project activities and created an interactive map using Geoclip software. Correlational analyses quantified associations between number of projects, neighbourhood characteristics and deprivation. A total of 134 community organizations were identified, and 183 grassroots projects were inventoried. A large number of projects were aimed at increasing awareness of/improving active or public transportation (n=95), improving road safety (n=84) and enhancing neighbourhood beautification and greening (n=69). The correlation between the presence of projects and the extent of neighbourhood material deprivation was small (Kendall's t=0.26, p<0.001), but in areas with greater social deprivation there were more projects (Kendall's t=0.38, p<0.001). Larger numbers of projects were also associated with the presence of more extensive land-use mix (Kendall's t=0.23, p<0.001) and a greater proportion of road intersections with injured pedestrians, cyclists and motor vehicle users (Kendall's t=0.43, p<0.001). There is significant community mobilization around built environments and active transportation. Investigations of the implementation processes and impacts are warranted.

  1. Project SAFE. Update of the SFR-1 safety assessment. Phase 1

    International Nuclear Information System (INIS)

    Andersson, Johan; Riggare, P.; Skagius, K.

    1998-10-01

    SFR-1 is a facility for disposal of low-level radioactive operational waste from the nuclear power plants in Sweden. Low-level radioactive waste from industry, medicine, and research is also disposed in SFR-1. The facility is situated in bedrock beneath the Baltic Sea, 1 km off the coast near the Forsmark nuclear power plant. SFR-1 was built between the years 1983 and 1988. An assessment of the long-term performance of the facility was included in the vast documentation that was a part of the application for an operational license. The assessment was presented in the form of a final safety report. In the operational licence for SFR-1 it is stated that renewed safety assessments should be carried out at least each ten years. In order to meet this demand SKB has launched a special project, SAFE (Safety Assessment of Final Disposal of Operational Radioactive Waste). The aim of the project is to update the safety analysis and to prepare a safety report that will be presented to the Swedish authorities not later than year 2000. Project SAFE is divided into three phases. The first phase is a prestudy, and the results of the prestudy are given in this report. The aim of the prestudy is to identify issues where additional studies would improve the basis for the updated safety analysis as well as to suggest how these studies should be carried out. The work has been divided into six different topics, namely the inventory, the near field, the far field, the biosphere, radionuclide transport calculations and scenarios. For each topic the former safety reports and regulatory reviews are scrutinised and needs for additional work is identified. The evaluations are given in appendices covering the respective topics. The main report is a summary of the appendices with a more stringent description of the repository system and the processes that are of interest and therefore should be addressed in an updated safety assessment. However, it should be pointed out that one of the

  2. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    Science.gov (United States)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  3. Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Zubair Ahmed Memon

    2013-04-01

    Full Text Available Many studies have shown that the construction industry one of the most hazardous industries with its high rates of fatalities and injuries and high financial losses incurred through work related accident. To reduce or overcome the safety issues on construction sites, different safety programs are introduced by construction firms. A questionnaire survey study was conducted to highlight the influence of the Construction Safety Factors on safety program implementation. The input from the questionnaire survey was analyzed by using AIM (Average Index Method and rank correlation test was conducted between different groups of respondents to measure the association between different groups of respondent. The finding of this study highlighted that management support is the critical factor for implementing the safety program on projects. From statistical test, it is concluded that all respondent groups were strongly in the favor of management support factor as CSF (Critical Success Factor. The findings of this study were validated on selected case studies. Results of the case studies will help to know the effect of the factors on implementing safety programs during the execution stage.

  4. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  5. Integrated Framework for Patient Safety and Energy Efficiency in Healthcare Facilities Retrofit Projects.

    Science.gov (United States)

    Mohammadpour, Atefeh; Anumba, Chimay J; Messner, John I

    2016-07-01

    There is a growing focus on enhancing energy efficiency in healthcare facilities, many of which are decades old. Since replacement of all aging healthcare facilities is not economically feasible, the retrofitting of these facilities is an appropriate path, which also provides an opportunity to incorporate energy efficiency measures. In undertaking energy efficiency retrofits, it is vital that the safety of the patients in these facilities is maintained or enhanced. However, the interactions between patient safety and energy efficiency have not been adequately addressed to realize the full benefits of retrofitting healthcare facilities. To address this, an innovative integrated framework, the Patient Safety and Energy Efficiency (PATSiE) framework, was developed to simultaneously enhance patient safety and energy efficiency. The framework includes a step -: by -: step procedure for enhancing both patient safety and energy efficiency. It provides a structured overview of the different stages involved in retrofitting healthcare facilities and improves understanding of the intricacies associated with integrating patient safety improvements with energy efficiency enhancements. Evaluation of the PATSiE framework was conducted through focus groups with the key stakeholders in two case study healthcare facilities. The feedback from these stakeholders was generally positive, as they considered the framework useful and applicable to retrofit projects in the healthcare industry. © The Author(s) 2016.

  6. RADON-type disposal facility safety case for the co-ordinated research project on improvement of safety assessment methodologies for near surface radioactive waste disposal facilities (ISAM)

    International Nuclear Information System (INIS)

    Guskov, A.; Batanjieva, B.; Kozak, M.W.; Torres-Vidal, C.

    2002-01-01

    The ISAM safety assessment methodology was applied to RADON-type facilities. The assessments conducted through the ISAM project were among the first conducted for these kinds of facilities. These assessments are anticipated to lead to significantly improved levels of safety in countries with such facilities. Experience gained though this RADON-type Safety Case was already used in Russia while developing national regulatory documents. (author)

  7. Seismic safety margins research program. Project VIII load combination project: work plan

    International Nuclear Information System (INIS)

    Chou, C.K.; Vepa, K.; George, L.; Smith, P.D.

    1979-01-01

    The proposed load combination project has the following overall objectives: develop a methodology for appropriate combination of dynamic loads for nuclear power plants under normal plant operation, transients, accidents, and natural hazards; establish design criteria, load factors, and component service levels for appropriate combinations of dynamic loads or responses to be used in nuclear power plant design; determine the reliability of typical piping systems, both inside and outside the containment structure, and provide the NRC with a sound technical basis for defining the criteria for postulating pipe breaks; and determine the probabilities of a large LOCA induced directly and indirectly by a range of earthquakes

  8. Road safety in Poland : a contribution to the improvement of road safety in Poland in the framework of the GAMBIT project.

    NARCIS (Netherlands)

    Brouwer, M. Koornstra, M.J. Mulder, J.A.G. & Wegman, F.C.M.

    1995-01-01

    This report describes a SWOV Institute for Road Safety Research study. The study was commissioned: (1) to give a general opinion on the "GAMBIT" project contents; and (2) to express an expectation about the future traffic safety development in Poland. The SWOV contribution has been realized within

  9. Description of data-sources used in SafetyCube, Deliverable 3.1 of the H2020 project SafetyCube (Safety CaUsation, Benefits and Efficiency).

    NARCIS (Netherlands)

    Hagström, L. Thomson, R. Hermitte, T. Weijermars, W. Bos, N. Talbot, R. Thomas, P. Dupont, E. Martensen, H. Bauer, R. Hours, M. Høye, E. Jänsch, M. Murkovic, A. Niewöhner, W. Papadimitriou, E. Pérez, C. Phan, V. Usami, D. & Vázquez-de-Prada, J.

    2017-01-01

    Safety CaUsation, Benefits and Efficiency (SafetyCube) is a European Commission supported Horizon 2020 project with the objective of developing an innovative road safety Decision Support System (DSS) that will enable policy-makers and stakeholders to select and implement the most appropriate

  10. R&D Project Valuation Considering Changes of Economic Environment: A Case of a Pharmaceutical R&D Project

    Directory of Open Access Journals (Sweden)

    Jung Ho Park

    2018-03-01

    Full Text Available R&D project valuation is important for effective R&D portfolio management through decision making, related to the firm’s R&D productivity, sustainable management. In particular, scholars have emphasized the necessities of capturing option value in R&D and developed methods of real option valuation. However, despite suggesting various real option models, there are few studies on simultaneously employing mean-reverting stochastic process and Markov regime switching to describe the evolution of cash flow and to reflect time-varying parameters resulting from changes of economic environment. Therefore, we suggest a mean-reverting binomial lattice model under Markov regime switching and apply it to evaluate clinical development with project cases of the pharmaceutical industry. This study finds that decision making can be different according to the regime condition, thus the suggested model can capture risks caused by the uncertainty of the economic environment, represented by regime switching. Further, this study simulates the model according to rate parameter from 0.00 to 1.00 and risk-free interest rates for regimes 1 and 2 from ( r 1 = 4%, r 2 = 2% to ( r 1 = 7%, r 2 = 5%, and confirms the rigidity of the model. Therefore, in practice, the mean-reverting binomial lattice model under Markov regime switching proposed in this study for R&D project valuation contributes to assisting company R&D project managers make effective decision making considering current economic environment and future changes.

  11. An Interdisciplinary Design Project in Second Life: Creating a Virtual Marine Science Learning Environment

    Science.gov (United States)

    Triggs, Riley; Jarmon, Leslie; Villareal, Tracy A.

    2010-01-01

    Virtual environments can resolve many practical and pedagogical challenges within higher education. Economic considerations, accessibility issues, and safety concerns can all be somewhat alleviated by creating learning activities in a virtual space. Because of the removal of real-world physical limitations like gravity, durability and scope,…

  12. Radiological and environmental consequences. Final report of the Nordic Nuclear Safety Research project BOK-2

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-11-01

    Final report of the Nordic Nuclear Safety Research project BOK-2, Radiological and Environmental Consequences. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. This report focuses on the project itself and gives a general summary of the studies undertaken. A separate technical report summarises the work done by each research group and gives references to papers published in scientific journals. The topics in BOK-2 included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. (au)

  13. Pacific Northwest Laboratory annual report for 1985 to the DOE Office of the Assistant Secretary for Environment, Safety and Health. Part 5. Overview and assessment

    International Nuclear Information System (INIS)

    Faust, L.G.

    1986-02-01

    This volume is progress on work performed for the Office of Nuclear Safety, the Office of Operational Safety, and for the Office of Environmental Analysis for each project. Separate abstracts have been prepared for individual projects. ACR

  14. International intercomparison and harmonization projects for demonstrating the safety of radioactive waste management, decommissioning and radioactive waste disposal

    International Nuclear Information System (INIS)

    Metcalf, Phil; O'Donnell, Patricio; Jova Sed, Luis; Batandjieva, Borislava; Rowat, John; Kinker, Monica

    2008-01-01

    Full text: The Joint Convention on the safety of spent fuel management and the safety of radioactive waste management and the international safety standards on radioactive waste management, decommissioning and radioactive waste disposal call for assessment and demonstration of the safety of facilities and activities; during siting, design and construction prior to operation, periodically during operation and at the end of lifetime or upon closure of a waste disposal facility. In addition, more recent revisions of the international safety standards require the development of a safety case for such facilities and activities, documentation presenting all the arguments supporting the safety of the facilities and activities covering site and engineering features, quantitative safety assessment and management systems. Guidance on meeting these safety requirements also indicates the need for a graded approach to safety assessment, with the extent and complexity of the assessment being proportional to the complexity of the activity or facility, and its propensity for radiation hazard. Safety assessment approaches and methodologies have evolved over several decades and international interest in these developments has been considerable as they can be complex and often subjective, which has led to international projects being established aimed at harmonization. The IAEA has sponsored a number of such initiatives, particularly in the area of disposal facility safety, but more recently in the areas of pre disposal waste management and decommissioning, including projects known as ISAM, ASAM, SADRWMS and DeSa. The projects have a number of common aspects including development of standardized methodological approaches, application on test cases and assessment review; they also have activity and facility specific elements. The paper presents an overview of the projects, the outcomes from the projects to date and their future direction aimed very much at practical application of

  15. The water reactor safety research project index: a description of the computerized system for its databank

    International Nuclear Information System (INIS)

    Della Loggia, E.; Primavera, R.

    1993-01-01

    The water reactor nuclear safety research project index has been published by the CEC for many years as a compilation of information on research projects relating to LWR nuclear safety. Since 1981, it has been published, alternatively with NEA (OECD), every second year. The number of contributions from research organizations in Community member countries has steadily increased and reached the level of 1 700 pages, in which more than 600 project descriptions have been collected. In 1988, for the first time, the document was produced using a computerized system developed with the assistance of the ISEI (Institute for Systems Engineering and Informatics) of JRC Ispra. The data have been stored in a computer based in Ispra. The system allows searching a preselected set of subjects through the information stored in the computer: it makes the updating of the projects description much easier and makes the retrieval of the data possible. This report presents a short description of the computerized system developed for the databank of the index. The computerized system presented in this report is structured in a quite general way and for that reason can be adapted very easily to every field where a databank needs to be constituted in order to collect extended information on several projects. (authors). 6 figs., 5 tabs., 5 refs

  16. Reports of reactor safety research projects sponsored by the Federal Ministry for Research and Technology (BMFT)

    International Nuclear Information System (INIS)

    1984-04-01

    Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. the individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by he FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of progress in reactor safety research. The individual reports are classified according to the research program on the safety of LWRS 1977-1980 of the BMFT. Another table of contents uses the same classification system as applied in the nuclear safety index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in the sequence of their project numbers. (orig.) [de

  17. Human factors and technology environment in multinational project: problems and solutions

    International Nuclear Information System (INIS)

    Jardi Besa, X.; Munoz Cervantes, A.

    2012-01-01

    At the onset of nuclear projects in Spain, there was an import of nuclear technology. In a second phase, there was a transfer of technology. Subsequently, there was an adaptation of the technology. In this evolution, comparable to that of other countries, were involved several countries, overcoming the difficulties of human factors involved. The current nuclear projects multinationals have a new difficulty: the different industrial technological environments. This paper will address the organizational challenges of multinational engineering projects, in the type of project and the human factors of the participating companies.

  18. Environment, Safety, and Health Self-Assessment Report, Fiscal Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Chernowski, John

    2009-02-27

    Lawrence Berkeley National Laboratory's Environment, Safety, and Health (ES&H) Self-Assessment Program ensures that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The Self-Assessment Program, managed by the Office of Contract Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The functions of the program are to ensure that work is conducted safely, and with minimal negative impact to workers, the public, and the environment. The Self-Assessment Program is also the mechanism used to institute continuous improvements to the Laboratory's ES&H programs. The program is described in LBNL/PUB 5344, Environment, Safety, and Health Self-Assessment Program and is composed of four distinct assessments: the Division Self-Assessment, the Management of Environment, Safety, and Health (MESH) review, ES&H Technical Assurance, and the Appendix B Self-Assessment. The Division Self-Assessment uses the five core functions and seven guiding principles of ISM as the basis of evaluation. Metrics are created to measure performance in fulfilling ISM core functions and guiding principles, as well as promoting compliance with applicable regulations. The five core functions of ISM are as follows: (1) Define the Scope of Work; (2) Identify and Analyze Hazards; (3) Control the Hazards; (4) Perform the Work; and (5) Feedback and Improvement. The seven guiding principles of ISM are as follows: (1) Line Management Responsibility for ES&H; (2) Clear Roles and Responsibilities; (3) Competence Commensurate with Responsibilities; (4) Balanced Priorities; (5) Identification of ES&H Standards and Requirements; (6) Hazard Controls Tailored to the Work Performed; and (7) Operations Authorization. Performance indicators are developed by consensus with OCA, representatives from each division, and Environment, Health, and Safety (EH&S) Division program managers. Line management of each division performs the

  19. Public health safety and environment in inadequate hospital and healthcare settings: a review.

    Science.gov (United States)

    Baguma, D

    2017-03-01

    Public health safety and environmental management are concerns that pose challenges worldwide. This paper briefly assesses a selected impact of the environment on public health. The study used an assessment of environmental mechanism to analyse the underlying different pathways in which the health sector is affected in inadequate hospital and health care settings. We reviewed the limited available evidence of the association between the health sector and the environment, and the likely pathways through which the environment influences health. The paper also models the use of private health care as a function of costs and benefits relative to public care and no care. The need to enhancing policies to improve the administration of health services, strengthening interventions on environment using international agreements, like Rio Conventions, including measures to control hospital-related infection, planning for human resources and infrastructure construction development have linkage to improve environment care and public health. The present study findings partly also demonstrate the influence of demand for health on the environment. The list of possible interventions includes enhancing policies to improve the administration of health services, strengthening Rio Conventions implementation on environmental concerns, control of environmental hazards and public health. Copyright © 2016 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  20. General-purpose heat source project and space nuclear safety and fuels program. Progress report

    International Nuclear Information System (INIS)

    Maraman, W.J.

    1979-12-01

    This formal monthly report covers the studies related to the use of 238 PuO 2 in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of the Los Alamos Scientific Laboratory. The two programs involved are general-purpose heat source development and space nuclear safety and fuels. Most of the studies discussed hear are of a continuing nature. Results and conclusions described may change as the work continues

  1. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  2. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    Science.gov (United States)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  3. Secure Software Configuration Management Processes for nuclear safety software development environment

    International Nuclear Information System (INIS)

    Chou, I.-Hsin

    2011-01-01

    Highlights: → The proposed method emphasizes platform-independent security processes. → A hybrid process based on the nuclear SCM and security regulations is proposed. → Detailed descriptions and Process Flow Diagram are useful for software developers. - Abstract: The main difference between nuclear and generic software is that the risk factor is infinitely greater in nuclear software - if there is a malfunction in the safety system, it can result in significant economic loss, physical damage or threat to human life. However, secure software development environment have often been ignored in the nuclear industry. In response to the terrorist attacks on September 11, 2001, the US Nuclear Regulatory Commission (USNRC) revised the Regulatory Guide (RG 1.152-2006) 'Criteria for use of computers in safety systems of nuclear power plants' to provide specific security guidance throughout the software development life cycle. Software Configuration Management (SCM) is an essential discipline in the software development environment. SCM involves identifying configuration items, controlling changes to those items, and maintaining integrity and traceability of them. For securing the nuclear safety software, this paper proposes a Secure SCM Processes (S 2 CMP) which infuses regulatory security requirements into proposed SCM processes. Furthermore, a Process Flow Diagram (PFD) is adopted to describe S 2 CMP, which is intended to enhance the communication between regulators and developers.

  4. Measuring school climate in high schools: a focus on safety, engagement, and the environment.

    Science.gov (United States)

    Bradshaw, Catherine P; Waasdorp, Tracy E; Debnam, Katrina J; Johnson, Sarah Lindstrom

    2014-09-01

    School climate has been linked to multiple student behavioral, academic, health, and social-emotional outcomes. The US Department of Education (USDOE) developed a 3-factor model of school climate comprised of safety, engagement, and environment. This article examines the factor structure and measurement invariance of the USDOE model. Drawing upon 2 consecutive waves of data from over 25,000 high school students (46% minority), a series of exploratory and confirmatory factor analyses examined the fit of the Maryland Safe and Supportive Schools Climate Survey with the USDOE model. The results indicated adequate model fit with the theorized 3-factor model of school climate, which included 13 subdomains: safety (perceived safety, bullying and aggression, and drug use); engagement (connection to teachers, student connectedness, academic engagement, school connectedness, equity, and parent engagement); environment (rules and consequences, physical comfort, and support, disorder). We also found consistent measurement invariance with regard to student sex, grade level, and ethnicity. School-level interclass correlation coefficients ranged from 0.04 to .10 for the scales. Findings supported the USDOE 3-factor model of school climate and suggest measurement invariance and high internal consistency of the 3 scales and 13 subdomains. These results suggest the 56-item measure may be a potentially efficient, yet comprehensive measure of school climate. © 2014, American School Health Association.

  5. Ferrocyanide Safety Project Task 3 Ferrocyanide Aging Studies FY 1993 annual report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Lumetta, M.R.; Schiefelbein, G.F.

    1993-10-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in single-shell waste storage tanks (SSTs), in particular the storage of waste in a safe manner. This Task Team, composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), and outside consultants, was formed in response to the need for an updated analysis of safety questions about the Hanford ferrocyanide tanks. The Ferrocyanides Safety Project at PNL is part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, sponsored by the US Department of Energy's Tank Farm Project Office, is to (1) maintain the ferrocyanide tanks with minimal risk of an accident, (2) select one or more strategies to assure safe storage, and (3) close out the unreviewed safety question (USQ). This annual report gives the results of the work conducted by PNL in FY 1993 on Task 3, Ferrocyanides Aging Studies, which deals with the aging behavior of simulated ferrocyanide wastes. Aging processes include the dissolution and hydrolysis of nickel ferrocyanides in high pH aqueous solutions. Investigated were the effects of pH variation; ionic strength and sodium ion concentration; the presence of anions such as phosphate, carbonate, and nitrate; temperature; and gamma radiation on solubility of ferrocyanide materials including In-Farm-lA, Rev. 4 flowsheet-prepared Na 2 NiFe(CN) 6

  6. Final Hazard Classification and Auditable Safety Analysis for the 105-F Building Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Bond, S.L.

    1998-07-01

    The auditable safety analysis (ASA) documents the authorization basis for the partial decommissioning and facility modifications to place the 105-F Building into interim safe storage (ISS). Placement into the ISS is consistent with the preferred alternative identified in the Record of Decision (58 FR). Modifications will reduce the potential for release and worker exposure to hazardous and radioactive materials, as well as lower surveillance and maintenance (S ampersand M) costs. This analysis includes the following: A description of the activities to be performed in the course of the 105-F Building ISS Project. An assessment of the inventory of radioactive and other hazardous materials within the 105-F Building. Identification of the hazards associated with the activities of the 105-F Building ISS Project. Identification of internally and externally initiated accident scenarios with the potential to produce significant local or offsite consequences during the 105-F Building ISS Project. Bounding evaluation of the consequences of the potentially significant accident scenarios. Hazard classification based on the bounding consequence evaluation. Associated safety function and controls, including commitments. Radiological and other employee safety and health considerations

  7. Environment, Safety and Health progress assessment of the Idaho National Engineering Laboratory (INEL)

    International Nuclear Information System (INIS)

    1993-08-01

    The ES ampersand H Progress Assessments are part of the Department's continuous improvement process throughout DOE and its contractor organizations. The purpose of the INEL ES ampersand H Progress Assessment is to provide the Department with concise independent information on the following: (1) change in culture and attitude related to ES ampersand H activities; (2) progress and effectiveness of the ES ampersand H corrective actions resulting from previous Tiger Team Assessments; (3) adequacy and effectiveness of the ES ampersand H self-assessment programs of the DOE line organizations and the site management and operating contractor; and (4) effectiveness of DOE and contractor management structures, resources, and systems to effectively address ES ampersand H problems. It is not intended that this Progress Assessment be a comprehensive compliance assessments of ES ampersand H activities. The points of reference for assessing programs at the INEL were, for the most part, the 1991 INEL Tiger Team Assessment, the INEL Corrective Action Plan, and recent appraisals and self-assessments of INEL. Horizontal and vertical reviews of the following programmatic areas were conducted: Management: Corrective action program; self-assessment; oversight; directives, policies, and procedures; human resources management; and planning, budgeting, and resource allocation. Environment: Air quality management, surface water management, groundwater protection, and environmental radiation. Safety and Health: Construction safety, worker safety and OSHA, maintenance, packaging and transportation, site/facility safety review, and industrial hygiene

  8. Electronic Informational and Educational Environment as a Factor of Competence-Oriented Higher Pedagogical Education in the Sphere of Health, Safety and Environment

    Science.gov (United States)

    Kamerilova, Galina S.; Kartavykh, Marina A.; Ageeva, Elena L.; Veryaskina, Marina A.; Ruban, Elena M.

    2016-01-01

    The authors consider the question of computerisation in health, safety and environment teachers' training in the context of the general approaches and requirements of the Federal National Standard of Higher Education, which is realised through designing of electronic informational and educational environment. The researchers argue indispensability…

  9. Safety in numbers: does perceived safety mediate associations between the neighborhood social environment and physical activity among women living in disadvantaged neighborhoods?

    Science.gov (United States)

    Timperio, Anna; Veitch, Jenny; Carver, Alison

    2015-05-01

    The aim of this study is to examine associations between the neighborhood social environment and leisure-time physical activity (LTPA)(1) and walking among women, and whether these associations are mediated by perceived personal safety. Women (n = 3784) living in disadvantaged urban and rural neighborhoods within Victoria, Australia completed a self-administered survey on five social environment variables (neighborhood crime, neighborhood violence, seeing others walking and exercising in the neighborhood, social trust/cohesion), perceived personal safety, and their physical activity in 2007/8. Linear regression analyses examined associations between social environment variables and LTPA and walking. Potential mediating pathways were assessed using the product-of-coefficients test. Moderated mediation by urban/rural residence was examined. Each social environment variable was positively associated with engaging in at least 150 min/week of LTPA (OR = 1.16 to 1.56). Only two social environment variables, seeing others walking (OR = 1.45) and exercising (OR = 1.31), were associated with ≥ 150 min/week of walking. Perceived personal safety mediated all associations. Stronger mediation was found in urban areas for crime, violence and social trust/cohesion. The neighborhood social environment is an important influence on physical activity among women living in disadvantaged areas. Feelings of personal safety should not be included in composite or aggregate scores relating to the social environment. Copyright © 2015 Elsevier Inc. All rights reserved.

  10. Migration of nuclear criticality safety software from a mainframe to a workstation environment

    International Nuclear Information System (INIS)

    Bowie, L.J.; Robinson, R.C.; Cain, V.R.

    1993-01-01

    The Nuclear Criticality Safety Department (NCSD), Oak Ridge Y-12 Plant has undergone the transition of executing the Martin Marietta Energy Systems Nuclear Criticality Safety Software (NCSS) on IBM mainframes to a Hewlett-Packard (HP) 9000/730 workstation (NCSSHP). NCSSHP contains the following configuration controlled modules and cross-section libraries: BONAMI, CSAS, GEOMCHY, ICE, KENO IV, KENO Va, MODIIFY, NITAWL SCALE, SLTBLIB, XSDRN, UNIXLIB, albedos library, weights library, 16-Group HANSEN-ROACH master library, 27-Group ENDF/B-IV master library, and standard composition library. This paper will discuss the method used to choose the workstation, the hardware setup of the chosen workstation, an overview of Y-12 software quality assurance and configuration control methodology, code validation, difficulties encountered in migrating the codes, and advantages to migrating to a workstation environment

  11. Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program

    International Nuclear Information System (INIS)

    Walker, S.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. This document describes the Environment, Safety, Health, and Quality requirements for conducting BWID activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to BWID operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program Plans, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and System and Performance audits as they apply to the BWID Program

  12. The effect of Health, Safety and Environment Management System (HSE-MS on the improvement of safety performance indices in Urea and Ammonia Kermanshah Petrochemical Company

    Directory of Open Access Journals (Sweden)

    M. S. Poursoleiman

    2015-09-01

    Full Text Available Introduction: Work-related accidents may cause damage to people, environment and lead to waste of time and money. Health, Safety and Environment Management System has been developed in order to reduce accidents. This study aimed to investigate the effect of implementation of this system on reduction of the accidents and its consequences and also on the safety performance indices in Kermanshah Petrochemical Company. Material and Method: In this study, records of accidents were collected by OSHA incident report form 301 over 4 years. Following, the mean annual accidents and its consequences and safety performance indices were calculated and reported. Then, using statistical analysis, the impacts of two years implementation of this system on the accidents and its consequences and safety performance indices were evaluated. Result: The results showed that the implementation of HSE system was significantly correlated with Frequency Severity Indicator, Accident Severity Rate, lost days, minor accidents and total incidents (P-value 0.05. Conclusion: The implementation of Health, Safety and the Environment Management System caused a reduction in accidents and its consequences and most of the safety performance indices in the entire process cycle of Kermanshah Petrochemical Company. Overall, safety condition has been improved considerably.

  13. The use of living PSA in safety management, a procedure developed in the nordic project ''safety evaluation, NKS/SIK-1''

    International Nuclear Information System (INIS)

    Johanson, G.; Holmberg, J.

    1994-01-01

    The essential objective with the development of a living PSA concept is to bring the use of the plant specific PSA model out to the daily safety work to allow operational risk experience feedback and to increase the risk awareness of the intended users. This paper will present results of the Nordic project ''Safety Evaluation, NKS/SIK-1''. The SIK-1 project has defined and demonstrated the practical use of living PSA for safety evaluation and for identification of possible improvements in operational safety. Subjects discussed in this paper are dealing with the practical implementation and use of PSA to make proper safety related decisions and evaluation. (author). 24 refs, 1 fig., 1 tab

  14. Quality and Safety Assurance - Priority Task at Nuclear Power Projects Implementation

    International Nuclear Information System (INIS)

    Nenkova, B.; Manchev, B.; Tomov, E.

    2010-01-01

    Quality and safety assurance at implementation of nuclear power engineering projects is important and difficult task for realization. Many problems arise during this process, when many companies from different countries participate, with various kinds of activities and services provided. The scope of activities necessary for quality and safety assurance is therefore quite expanded and diverse. In order to increase the safety and reliability of Kozloduy NPP Plc (KNPP) Units 5 and 6, as well as to bring the units in conformity with the newest international requirements for quality and safety in the field of nuclear energy, a program for their modernization on the basis of different technical studies and assessments was implemented. The Units 5 and 6 Modernization Program of Kozloduy Nuclear Power Plant was composed of 212 modifications aimed to improve the safety, operability, and reliability of the Units. The Program was realized by stages during yearly planned outages since year 2002 to 2007, without additional outages. A major Program Objective was to extend the Units Life Time in at least 15 Years, under a continuous, safe, and reliable operation. The Modernization Program of Units 5 and 6 of the Bulgarian Nuclear Power Plant in Kozloduy was the first and for the time being the only one in the world, program in the field of nuclear power engineering, by which the full scope of recommendations for improvement of the Kozloduy NPP units was applied. The main goal of the National Electric Company, which is the Employer for the construction of new nuclear facility in Bulgaria, is after completion of all activities regarding construction of Belene NPP the plant to meet or exceed the requirements of the respective national and international quality and safety codes and standards, as well as the IAEA guidelines, as they are established. The objective of this report is to describe different aspects of the quality assurance according to the requirements of quality and

  15. Reports on BMBF-sponsored research projects in the field of reactor safety. Reporting period 1 July - 31 December 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The Gesellschaft fuer Anlagen- und Reaktorsicherheit informs of the status of LWR tasks and projects on the safety of advanced reactors. Each progress report represents a compilation of individual reports about objectives, the work performed, the results, and the next steps of the works. The individual reports of quality assurance, safety of reactor component, emergency core cooling, lors of coolant, meltdown, fission product release, risk and reliability, are classified according to projects to the reactor safety research program. Another table uses the same classification system as applied in the nuclear safety index of the CEC. (DG)

  16. A Social Contract for University-Industry Collaboration: A Case of Project-Based Learning Environment

    Science.gov (United States)

    Vartiainen, Tero

    This study determines a social contract for a form of university-industry collaboration to a project-based learning environment in close collaboration with industry. The author's previous studies on moral conflicts in a project-based learning (PjBL) environment and his 5-year engagement in the PjBL environment are used as background knowledge, and John Rawls' veil of ignorance is used as a method in the contract formulation. Fair and impartial treatment of actors is strived for with the contract which constitutes of sets of obligations for each party, students, clients, and university (instructors) in the chosen project course. With the contract fair and impartial treatment of actors is strived for and the most dilemmatic moral conflicts are tried to be avoided. The forming of the social contract is evaluated, and implications for research and collaborations in practice are offered.

  17. Prediction of safety critical software operational reliability from test reliability using testing environment factors

    International Nuclear Information System (INIS)

    Jung, Hoan Sung; Seong, Poong Hyun

    1999-01-01

    It has been a critical issue to predict the safety critical software reliability in nuclear engineering area. For many years, many researches have focused on the quantification of software reliability and there have been many models developed to quantify software reliability. Most software reliability models estimate the reliability with the failure data collected during the test assuming that the test environments well represent the operation profile. User's interest is however on the operational reliability rather than on the test reliability. The experiences show that the operational reliability is higher than the test reliability. With the assumption that the difference in reliability results from the change of environment, from testing to operation, testing environment factors comprising the aging factor and the coverage factor are developed in this paper and used to predict the ultimate operational reliability with the failure data in testing phase. It is by incorporating test environments applied beyond the operational profile into testing environment factors. The application results show that the proposed method can estimate the operational reliability accurately. (Author). 14 refs., 1 tab., 1 fig

  18. Final report of the 'Nordic thermal-hydraulic and safety network (NOTNET)' - Project

    International Nuclear Information System (INIS)

    Tuunanen, J.; Tuomainen, M.

    2005-04-01

    A Nordic network for thermal-hydraulics and nuclear safety research was started. The idea of the network is to combine the resources of different research teams in order to carry out more ambitious and extensive research programs than would be possible for the individual teams. From the very beginning, the end users of the research results have been integrated to the network. Aim of the network is to benefit the partners involved in nuclear energy in the Nordic Countries (power companies, reactor vendors, safety regulators, research units). First task within the project was to describe the resources (personnel, know-how, simulation tools, test facilities) of the various teams. Next step was to discuss with the end users about their research needs. Based on these steps, few most important research topics with defined goals were selected, and coarse road maps were prepared for reaching the targets. These road maps will be used as a starting point for planning the actual research projects in the future. The organisation and work plan for the network were established. National coordinators were appointed, as well as contact persons in each participating organisation, whether research unit or end user. This organisation scheme is valid for the short-term operation of NOTNET when only Nordic organisations take part in the work. Later on, it is possible to enlarge the network e.g. within EC framework programme. The network can now start preparing project proposals and searching funding for the first common research projects. (au)

  19. Device for increasing the safety in the environment of nuclear facilities in case of containment failure

    International Nuclear Information System (INIS)

    Morlock, G.; Wiesemes, J.; Bachner, D.

    1978-01-01

    In order to increase the safety in the environment of nuclear facilities, e.g. in case of containment failure, with respect to released radioactive material new or existing facilities are covered with ground. The ground material has got a consistency very much reducing the permeability for liquids and gases. In addition irrigation devices for keeping the ground wet and/or intermediate layers of films pervious to water, e.g. perforated sheets, may be provided. Additionally the ground is protected against frost. Especially suited for ground material is clay. (DG) [de

  20. Integrated Management System in construction company-effective tool of quality, environment and safety level improving

    OpenAIRE

    Gašparík, Jozef

    2009-01-01

    Contribution Presents the struCture of integrated M anageMent systeM ( iMs) according to international standards ISO 9001:2008, ISO 14001:2004 and STN OHSAS 18001:2009, which consists of 3 management systems focused to quality, environment and safety of building processes. The purpose of paper is to describe basic steps concerning the development of IMS. Paper analises basic processes of IMS like company vision, IMS planning, implementing, monitoring, revive and improving. The paper presents ...