WorldWideScience

Sample records for project entitled low-cost

  1. A low-cost and portable realization on fringe projection three-dimensional measurement

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  2. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  3. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    Science.gov (United States)

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  4. Project-based physics labs using low-cost open-source hardware

    Science.gov (United States)

    Bouquet, F.; Bobroff, J.; Fuchs-Gallezot, M.; Maurines, L.

    2017-03-01

    We describe a project-based physics lab, which we proposed to third-year university students. These labs are based on new open-source low-cost equipment (Arduino microcontrollers and compatible sensors). Students are given complete autonomy: they develop their own experimental setup and study the physics topic of their choice. The goal of these projects is to let students to discover the reality of experimental physics. Technical specifications of the acquisition material and case studies are presented for practical implementation in other universities.

  5. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  6. Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

    Science.gov (United States)

    Spremo, Stevan; Bregman, Jesse; Dallara, Christopher D.; Ghassemieh, Shakib M.; Hanratty, James; Jackson, Evan; Kitts, Christopher; Klupar, Pete; Lindsay, Michael; Ignacio, Mas; hide

    2009-01-01

    The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained

  7. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  8. Hidden costs of low-cost screening mammography

    International Nuclear Information System (INIS)

    Cyrlak, D.

    1987-01-01

    Twenty-two hundred women in Orange County, California, took part in a low-cost mammography screening project sponsored by the American Cancer Society and the KCBS-TV. Patients were followed up by telephone and questioned about actual costs incurred as a result of screening mammography, including costs of repeated and follow-up mammograms, US examinations and surgical consultations. The total number of biopsies, cancers found, and the costs involved were investigated. The authors' results suggest that particularly in centers with a high positive call rate, the cost of screening mammograms accounts for only a small proportion of the medical costs

  9. Opportunities for low-cost CO2 storage demonstration projects in China

    International Nuclear Information System (INIS)

    Meng, Kyle C.; Williams, Robert H.; Celia, Michael A.

    2007-01-01

    Several CO 2 storage demonstration projects are needed in a variety of geological formations worldwide to prove the viability of CO 2 capture and storage as a major option for climate change mitigation. China has several low-cost CO 2 sources at sites that produce NH 3 from coal via gasification. At these plants, CO 2 generated in excess of the amount needed for other purposes (e.g., urea synthesis) is vented as a relatively pure stream. These CO 2 sources would potentially be economically interesting candidates for storage demonstration projects if there are suitable storage sites nearby. In this study a survey was conducted to estimate CO 2 availability at modern Chinese coal-fed ammonia plants. Results indicate that annual quantities of available, relatively pure CO 2 per site range from 0.6 to 1.1 million tonnes. The CO 2 source assessment was complemented by analysis of possible nearby opportunities for CO 2 storage. CO 2 sources were mapped in relation to China's petroliferous sedimentary basins where prospective CO 2 storage reservoirs possibly exist. Four promising pairs of sources and sinks were identified. Project costs for storage in deep saline aquifers were estimated for each pairing ranging from $15-21/t of CO 2 . Potential enhanced oil recovery and enhanced coal bed methane recovery opportunities near each prospective source were also considered

  10. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    International Nuclear Information System (INIS)

    Tomes, John J; Finlayson, Chris E

    2016-01-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values. (paper)

  11. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    Science.gov (United States)

    Tomes, John J.; Finlayson, Chris E.

    2016-09-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values.

  12. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  13. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  14. Effective seismic acceleration measurements for low-cost Structural Health Monitoring

    Science.gov (United States)

    Pentaris, Fragkiskos; Makris, John P.

    2015-04-01

    There is increasing demand on cost effective Structural Health Monitoring systems for buildings as well as important and/or critical constructions. The front end for all these systems is the accelerometer. We present a comparative study of two low cost MEMS accelaration sensors against a very sensitive, high dynamic range strong motion accelerometer of force balance type but much more expensive. A real experiment was realized by deploying the three sesnors in a reinforced concrete building of the premises of TEI of Crete at Chania Crete, an earthquake prone region. The analysis of the collected accelararion data from many seismic events indicates that all sensors are able to efficiently reveal the seismic response of the construction in terms of PSD. Furthermore, it is shown that coherence diagrams between excitation and response of the building under study, depict structural characteristics but also the seismic energy distribution. This work is supported by the Archimedes III Program of the Ministry of Education of Greece, through the Operational Program "Educational and Lifelong Learning", in the framework of the project entitled "Interdisciplinary Multi-Scale Research of Earthquake Physics and Seismotectonics at the front of the Hellenic Arc (IMPACT-ARC)" and is co-financed by the European Union (European Social Fund) and Greek national funds.

  15. Measurement of Psychological Entitlement in 28 Countries

    Czech Academy of Sciences Publication Activity Database

    Żemojtel-Piotrowska, M.; Piotrowski, J.; Cieciuch, J.; Calogero, R.M.; Van Hiel, A.; Argentero, P.; Baltatescu, S.; Baran, T.; Bardhwaj, G.; Bukowski, M.; Chargazia, M.; Clinton, A.; Halik, M.H.; Ilisko, D.; Khachatryan, N.; Klicperová-Baker, Martina; Košťál, Jaroslav; Kovacs, M.; Letovancova, E.; Liik, K.; Marganski, A.; Michałowski, J.; Nord, I.; Paspalanova, E.; de Leon, P.P.; Techera, J.; Rojas, M.; Różycka, J.; Sawicka, A.; Seibt, B.; Semkiv, I.; Tiliouine, H.; Truong, H.K.; Van den Bos, K.; Wills-Herrera, E.

    2017-01-01

    Roč. 33, č. 3 (2017), s. 207-217 ISSN 1015-5759 R&D Projects: GA ČR GA15-11062S Institutional support: RVO:68081740 Keywords : psychological entitlement * Entitlement Attitudes Questionnaire * cross-cultural research * measurement invariance Subject RIV: AN - Psychology OBOR OECD: Psychology (including human - machine relations) Impact factor: 2.328, year: 2016 http://econtent.hogrefe.com/doi/abs/10.1027/1015-5759/a000286

  16. Low-cost inertial measurement unit.

    Energy Technology Data Exchange (ETDEWEB)

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

  17. The implications of regional and national demographic projections for future GMS costs in Ireland through to 2026.

    LENUS (Irish Health Repository)

    Conway, Aisling

    2014-10-21

    As the health services in Ireland have become more resource-constrained, pressure has increased to reduce public spending on community drug schemes such as General Medical Services (GMS) drug prescribing and to understand current and future trends in prescribing. The GMS scheme covers approximately 37% of the Irish population in 2011 and entitles them, inter alia, to free prescription drugs and appliances. This paper projects the effects of future changes in population, coverage, claims rates and average claims cost on GMS costs in Ireland.

  18. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    expenditures. Good project management goes hand-in-hand with increasing sales. Cost/CYP is a powerful tool, but some project strategies alter its meaning. Some projects have lowered net costs by selling products at high prices. This dilutes the social marketing credo of getting low-cost projects to those in need. When this occurs, cost/CYP undergoes an identity crisis, for it no longer measures a purely social objective.

  19. A Low-Cost Data Acquisition System for Automobile Dynamics Applications

    Science.gov (United States)

    González, Alejandro; Vinolas, Jordi

    2018-01-01

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in project costs to be reduced and thus facilitating access to this kind of research that requires limited resources. PMID:29382039

  20. A Low-Cost Data Acquisition System for Automobile Dynamics Applications.

    Science.gov (United States)

    González, Alejandro; Olazagoitia, José Luis; Vinolas, Jordi

    2018-01-27

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources.

  1. (abstract) Science-Project Interaction in the Low-Cost Mission

    Science.gov (United States)

    Wall, Stephen D.

    1994-01-01

    Large, complex, and highly optimized missions have performed most of the preliminary reconnaisance of the solar system. As a result we have now mapped significant fractions of its total surface (or surface-equivalent) area. Now, however, scientific exploration of the solar system is undergoing a major change in scale, and existing missions find it necessary to limit costs while fulfilling existing goals. In the future, NASA's Discovery program will continue the reconnaisance, exploration, and diagnostic phases of planetary research using lower cost missions, which will include lower cost mission operations systems (MOS). Historically, one of the more expensive functions of MOS has been its interaction with the science community. Traditional MOS elements that this interaction have embraced include mission planning, science (and engineering) event conflict resolution, sequence optimization and integration, data production (e.g., assembly, enhancement, quality assurance, documentation, archive), and other science support services. In the past, the payoff from these efforts has been that use of mission resources has been highly optimized, constraining resources have been generally completely consumed, and data products have been accurate and well documented. But because these functions are expensive we are now challenged to reduce their cost while preserving the benefits. In this paper, we will consider ways of revising the traditional MOS approach that might save project resources while retaining a high degree of service to the Projects' customers. Pre-launch, science interaction can be made simplier by limiting numbers of instruments and by providing greater redundancy in mission plans. Post launch, possibilities include prioritizing data collection into a few categories, easing requirements on real-time of quick-look data delivery, and closer integration of scientists into the mission operation.

  2. Auctioning payment entitlements

    DEFF Research Database (Denmark)

    Nielsen, Kurt

    2005-01-01

    Payment entitlements is a new commodity that arises from the new European common agricultural policy. The agricultural subsidies are decoupled from the actual production and replaced by the so-called payment entitlements. A payment entitlement has a farm specific value and may be freely traded. T...

  3. Key issues for low-cost FGD installations

    Energy Technology Data Exchange (ETDEWEB)

    DePriest, W.; Mazurek, J.M. [Sargent & Lundy LLC, Chicago, IL (United States)

    1995-12-01

    This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.

  4. 14 CFR 151.41 - Project costs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...

  5. Low-cost uncooled VOx infrared camera development

    Science.gov (United States)

    Li, Chuan; Han, C. J.; Skidmore, George D.; Cook, Grady; Kubala, Kenny; Bates, Robert; Temple, Dorota; Lannon, John; Hilton, Allan; Glukh, Konstantin; Hardy, Busbee

    2013-06-01

    The DRS Tamarisk® 320 camera, introduced in 2011, is a low cost commercial camera based on the 17 µm pixel pitch 320×240 VOx microbolometer technology. A higher resolution 17 µm pixel pitch 640×480 Tamarisk®640 has also been developed and is now in production serving the commercial markets. Recently, under the DARPA sponsored Low Cost Thermal Imager-Manufacturing (LCTI-M) program and internal project, DRS is leading a team of industrial experts from FiveFocal, RTI International and MEMSCAP to develop a small form factor uncooled infrared camera for the military and commercial markets. The objective of the DARPA LCTI-M program is to develop a low SWaP camera (costs less than US $500 based on a 10,000 units per month production rate. To meet this challenge, DRS is developing several innovative technologies including a small pixel pitch 640×512 VOx uncooled detector, an advanced digital ROIC and low power miniature camera electronics. In addition, DRS and its partners are developing innovative manufacturing processes to reduce production cycle time and costs including wafer scale optic and vacuum packaging manufacturing and a 3-dimensional integrated camera assembly. This paper provides an overview of the DRS Tamarisk® project and LCTI-M related uncooled technology development activities. Highlights of recent progress and challenges will also be discussed. It should be noted that BAE Systems and Raytheon Vision Systems are also participants of the DARPA LCTI-M program.

  6. Social policy and entitlements : a proposal for reform

    NARCIS (Netherlands)

    Nentjes, Andries; Meijer, G; Heijman, WJM; VanOphem, JAC; Verstegen, BHJ

    2006-01-01

    Welfare states citizens have entitlements to a variety of social services provided for free or a price far below cost, such as education, health care, social security and housing. Every citizen benefits, but in their present organisation the social services also have major deficiencies: lack of

  7. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  8. Low-cost, highly transparent flexible low-e coating film to enable electrochromic windows with increased energy savings

    Energy Technology Data Exchange (ETDEWEB)

    Berland, Brian [ITN Energy Systems, Inc., Littleton, CO (United States); Hollingsworth, Russell [ITN Energy Systems, Inc., Littleton, CO (United States)

    2015-03-31

    Five Quads of energy are lost through windows annually in the U.S. Low-e coatings are increasingly employed to reduce the wasted energy. Most commonly, the low-e coating is an oxide material applied directly to the glass at high temperature. With over 100,000,000 existing homes, a retrofit product is crucial to achieve widespread energy savings. Low-e films, i.e. coatings on polymeric substrates, are now also available to meet this need. However, the traditional oxide materials and process is incompatible with low temperature plastics. Alternate high performing low-e films typically incorporate materials that limit visible transmission to 35% or less. Further, the cost is high. The objective of this award was to develop a retrofit, integrated low-e/electrochromic window film to dramatically reduce energy lost through windows. While field testing of state-of-the-art electrochromic (EC) windows show the energy savings are maximized if a low-e coating is used in conjunction with the EC, available low-e films have a low visible transmission (~70% or less) that limits the achievable clear state and therefore, appearance and energy savings potential. Comprehensive energy savings models were completed at Lawrence Berkeley National Lab (LBNL). A parametric approach was used to project energy usage for windows with a large range of low-e properties across all U.S. climate zones, without limiting the study to materials that had already been produced commercially or made in a lab. The model enables projection of energy savings for low-e films as well as integrated low-e/EC products. This project developed a novel low-e film, optimized for compatibility with EC windows, using low temperature, high deposition rate processes for the growth of low-e coatings on plastic films by microwave plasma enhanced chemical vapor deposition. Silica films with good density and optical properties were demonstrated at deposition rates as high as 130Å/sec. A simple bi-layer low-e stack of

  9. The future cost of cancer in South Africa: An interdisciplinary cost management strategy.

    Science.gov (United States)

    Sartorius, K; Sartorius, B; Govender, P S; Sharma, V; Sherriff, A

    2016-09-06

    The exponential rise in cancer costs in South Africa (SA) was illustrated in a recent Sunday Times article entitled 'The cost of cancer can be a debt sentence'. Our Minister of Health talks of a 'war' against the high costs of cancer drugs, and epidemiologists project a sharply rising incidence. Eminent international medical journals, such as The Lancet, underline the fact that cancer cost is a growing international problem that confronts even the richest countries. If richer countries in the world are battling to cover the costs of cancer, what is the prognosis for SA?

  10. DEVELOPMENT OF LOW-COST MANUFACTURING PROCESSES FOR PLANAR, MULTILAYER SOLID OXIDE FUEL CELL ELEMENTS

    Energy Technology Data Exchange (ETDEWEB)

    Scott Swartz; Matthew Seabaugh; William Dawson; Harlan Anderson; Tim Armstrong; Michael Cobb; Kirby Meacham; James Stephan; Russell Bennett; Bob Remick; Chuck Sishtla; Scott Barnett; John Lannutti

    2004-06-12

    This report summarizes the results of a four-year project, entitled, ''Low-Cost Manufacturing Of Multilayer Ceramic Fuel Cells'', jointly funded by the U.S. Department of Energy, the State of Ohio, and by project participants. The project was led by NexTech Materials, Ltd., with subcontracting support provided by University of Missouri-Rolla, Michael A. Cobb & Co., Advanced Materials Technologies, Inc., Edison Materials Technology Center, Gas Technology Institute, Northwestern University, and The Ohio State University. Oak Ridge National Laboratory, though not formally a subcontractor on the program, supported the effort with separate DOE funding. The objective of the program was to develop advanced manufacturing technologies for making solid oxide fuel cell components that are more economical and reliable for a variety of applications. The program was carried out in three phases. In the Phase I effort, several manufacturing approaches were considered and subjected to detailed assessments of manufacturability and development risk. Estimated manufacturing costs for 5-kW stacks were in the range of $139/kW to $179/kW. The risk assessment identified a number of technical issues that would need to be considered during development. Phase II development work focused on development of planar solid oxide fuel cell elements, using a number of ceramic manufacturing methods, including tape casting, colloidal-spray deposition, screen printing, spin-coating, and sintering. Several processes were successfully established for fabrication of anode-supported, thin-film electrolyte cells, with performance levels at or near the state-of-the-art. The work in Phase III involved scale-up of cell manufacturing methods, development of non-destructive evaluation methods, and comprehensive electrical and electrochemical testing of solid oxide fuel cell materials and components.

  11. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  12. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  13. Projections of costs, financing, and additional resource requirements for low- and lower middle-income country immunization programs over the decade, 2011-2020.

    Science.gov (United States)

    Gandhi, Gian; Lydon, Patrick; Cornejo, Santiago; Brenzel, Logan; Wrobel, Sandra; Chang, Hugh

    2013-04-18

    The Decade of Vaccines Global Vaccine Action Plan has outlined a set of ambitious goals to broaden the impact and reach of immunization across the globe. A projections exercise has been undertaken to assess the costs, financing availability, and additional resource requirements to achieve these goals through the delivery of vaccines against 19 diseases across 94 low- and middle-income countries for the period 2011-2020. The exercise draws upon data from existing published and unpublished global forecasts, country immunization plans, and costing studies. A combination of an ingredients-based approach and use of approximations based on past spending has been used to generate vaccine and non-vaccine delivery costs for routine programs, as well as supplementary immunization activities (SIAs). Financing projections focused primarily on support from governments and the GAVI Alliance. Cost and financing projections are presented in constant 2010 US dollars (US$). Cumulative total costs for the decade are projected to be US$57.5 billion, with 85% for routine programs and the remaining 15% for SIAs. Delivery costs account for 54% of total cumulative costs, and vaccine costs make up the remainder. A conservative estimate of total financing for immunization programs is projected to be $34.3 billion over the decade, with country governments financing 65%. These projections imply a cumulative funding gap of $23.2 billion. About 57% of the total resources required to close the funding gap are needed just to maintain existing programs and scale up other currently available vaccines (i.e., before adding in the additional costs of vaccines still in development). Efforts to mobilize additional resources, manage program costs, and establish mutual accountability between countries and development partners will all be necessary to ensure the goals of the Decade of Vaccines are achieved. Establishing or building on existing mechanisms to more comprehensively track resources and

  14. Sequential Low Cost Interventions Double Hand Hygiene Rates ...

    African Journals Online (AJOL)

    Sequential Low Cost Interventions Double Hand Hygiene Rates Among Medical Teams in a Resource Limited Setting. Results of a Hand Hygiene Quality Improvement Project Conducted At University Teaching Hospital of Kigali (Chuk), Kigali, Rwanda.

  15. Research on the Investment Costs of IT Project

    Science.gov (United States)

    Zurong, Chen; Feng, Jingchun

    2018-02-01

    The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.

  16. Small and low head pumped storage projects

    International Nuclear Information System (INIS)

    Makarechian, A.H.

    1991-01-01

    The purpose of this paper is to focus attention on small and low head pumped storage projects. These projects may be defined as having a capacity of less than 200-300 MW and down to about 20 MW, with heads of 1200 ft to about 300 ft or less. Many advantages of these smaller pumped storage projects include more flexibility in siting of a project, considerably shorter licensing and construction period, adaptability to closed system design concept to reduce adverse environmental impacts, considerably reduced risks of delays and substantial cost over-runs, better suited to meeting peaking capacity requirements for individual utilities, and much less transmission inter-connection requirements. An overall licensing and construction schedule of about 3 to 3 1/2 years is realistic for many smaller pumped storage projects, and competitive costs in terms of dollars per kW installed can be achieved

  17. Project Minerva: A low cost manned Mars mission based on indigenous propellant production

    Science.gov (United States)

    Beder, David; Bryan, Richard; Bui, Tuyen; Caviezel, Kelly; Cinnamon, Mark; Daggert, Todd; Folkers, Mike; Fornia, Mark; Hanks, Natasha; Hamilton, Steve

    1992-01-01

    Project Minerva is a low-cost manned Mars mission designed to deliver a crew of four to the Martian surface using only two sets of two launches from the Kennedy Space Center. Key concepts which make this mission realizable are the use of near-term technologies and in-situ propellant production, following the scenario originally proposed by R. Zubrin. The first set of launches delivers two unmanned payloads into low Earth orbit (LEO): the first payload consists of an Earth Return Vehicle (ERV), a propellant production plant, and a set of robotic vehicles; the second payload consists of the trans-Mars injection (TMI) upper stage. In LEO, the two payloads are docked and the configuration is injected into a Mars transfer orbit. The landing on Mars is performed with the aid of multiple aerobraking maneuvers. On the Martian surface, the propellant production plant uses a Sabatier/electrolysis type process to combine nine tons of hydrogen with carbon dioxide from the Martian atmosphere to produce over a hundred tons of liquid oxygen and liquid methane, which are later used as the propellants for the rover expeditions and the manned return journey of the ERV. The systems necessary for the flights to and from Mars, as well as those needed for the stay on Mars, are discussed. These systems include the transfer vehicle design, life support, guidance and communications, rovers and telepresence, power generation, and propellant manufacturing. Also included are the orbital mechanics, the scientific goals, and the estimated mission costs.

  18. Low-cost solar array structure development

    Science.gov (United States)

    Wilson, A. H.

    1981-06-01

    Early studies of flat-plate arrays have projected costs on the order of $50/square meter for installed array support structures. This report describes an optimized low-cost frame-truss structure that is estimated to cost below $25/square meter, including all markups, shipping an installation. The structure utilizes a planar frame made of members formed from light-gauge galvanized steel sheet and is supposed in the field by treated-wood trusses that are partially buried in trenches. The buried trusses use the overburden soil to carry uplift wind loads and thus to obviate reinforced-concrete foundations. Details of the concept, including design rationale, fabrication and assembly experience, structural testing and fabrication drawings are included.

  19. Final Project Report for DOE/EERE High-Capacity and Low-Cost Hydrogen-Storage Sorbents for Automotive Applications

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Hong-Cai [Texas A & M Univ., College Station, TX (United States); Liu, Di-Jia [Texas A & M Univ., College Station, TX (United States)

    2017-12-01

    This report provides a review of the objectives, progress, and milestones of the research conducted during this project on the topic of developing innovative metal-organic frameworks (MOFs) and porous organic polymers (POPs) for high-capacity and low-cost hydrogen-storage sorbents in automotive applications.1 The objectives of the proposed research were to develop new materials as next-generation hydrogen storage sorbents that meet or exceed DOE’s 2017 performance targets of gravimetric capacity of 0.055 kg H2/kgsystem and volumetric capacity of 0.040 kg H2/Lsystem at a cost of $400/kg H2 stored. Texas A&M University (TAMU) and Argonne National Laboratory (ANL) collaborated in developing low-cost and high-capacity hydrogen-storage sorbents with appropriate stability, sorption kinetics, and thermal conductivity. The research scope and methods developed to achieve the project’s goals include the following: Advanced ligand design and synthesis to construct MOF sorbents with optimal hydrogen storage capacities, low cost and high stability; Substantially improve the hydrogen uptake capacity and chemical stability of MOF-based sorbents by incorporating high valent metal ions during synthesis or through the post-synthetic metal metathesis oxidation approach; Enhance sorbent storage capacity through material engineering and characterization; Generate a better understanding of the H2-sorbent interaction through advanced characterization and simulation. Over the course of the project 5 different MOFs were developed and studied: PCN-250, PCN-12, PCN-12’, PCN-608 and PCN-609.2-3 Two different samples were submitted to the National Renewable Energy Laboratory (NREL) in order to validate their hydrogen adsorption capacity, PCN-250 and PCN-12. Neither of these samples reached the project’s Go/No-Go requirements but the data obtained did further prove the hypothesis that the presence of open metal

  20. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  1. Low-Cost, High-Throughput 3-D Pulmonary Imager Using Hyperpolarized Contrast Agents and Low-Field MRI

    Science.gov (United States)

    2017-10-01

    low- cost and high-throughput was a key element proposed for this project, which we believe will be of significant benefit to the patients suffering...Award Number: W81XWH-15-1-0272 TITLE: Low- Cost , High-Throughput 3-D Pulmonary Imager Using Hyperpolarized Contrast Agents and Low-Field MRI...STATEMENT: Approved for Public Release; Distribution Unlimited The views, opinions and/or findings contained in this report are those of the author(s

  2. High Efficiency, Low Cost Scintillators for PET

    International Nuclear Information System (INIS)

    Kanai Shah

    2007-01-01

    Inorganic scintillation detectors coupled to PMTs are an important element of medical imaging applications such as positron emission tomography (PET). Performance as well as cost of these systems is limited by the properties of the scintillation detectors available at present. The Phase I project was aimed at demonstrating the feasibility of producing high performance scintillators using a low cost fabrication approach. Samples of these scintillators were produced and their performance was evaluated. Overall, the Phase I effort was very successful. The Phase II project will be aimed at advancing the new scintillation technology for PET. Large samples of the new scintillators will be produced and their performance will be evaluated. PET modules based on the new scintillators will also be built and characterized

  3. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  4. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  5. 10 CFR 611.102 - Eligible project costs.

    Science.gov (United States)

    2010-01-01

    ... Accounting Principles and these costs may be considered by DOE in determining the Borrower's contribution to... 10 Energy 4 2010-01-01 2010-01-01 false Eligible project costs. 611.102 Section 611.102 Energy... PROGRAM Direct Loan Program § 611.102 Eligible project costs. (a) Eligible costs are: (1) Those costs that...

  6. Low-Cost Air Quality Monitoring Tools: From Research to Practice (A Workshop Summary

    Directory of Open Access Journals (Sweden)

    Andrea L. Clements

    2017-10-01

    Full Text Available In May 2017, a two-day workshop was held in Los Angeles (California, U.S.A. to gather practitioners who work with low-cost sensors used to make air quality measurements. The community of practice included individuals from academia, industry, non-profit groups, community-based organizations, and regulatory agencies. The group gathered to share knowledge developed from a variety of pilot projects in hopes of advancing the collective knowledge about how best to use low-cost air quality sensors. Panel discussion topics included: (1 best practices for deployment and calibration of low-cost sensor systems, (2 data standardization efforts and database design, (3 advances in sensor calibration, data management, and data analysis and visualization, and (4 lessons learned from research/community partnerships to encourage purposeful use of sensors and create change/action. Panel discussions summarized knowledge advances and project successes while also highlighting the questions, unresolved issues, and technological limitations that still remain within the low-cost air quality sensor arena.

  7. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  8. DEVELOPMENT OF A LOW COST CAMERA FOR AGING ACCELERATED POLYMERS

    Directory of Open Access Journals (Sweden)

    Carlos Henrique Duarte Felisbino

    2018-03-01

    Full Text Available The objective of this paper is to describe the design, construction and testing of a low cost chamber for accelerated aging of polymers that meets a low and high ultraviolet radiation cycle on the test specimens in accordance with ASTM G154. The methodology was based on the survey of the standards related to the tests of accelerated aging of polymers and of the existing equipment, providing the subsidies for the development of the project, which was validated by the construction and evaluation of its performance. The camera control is performed by an Arduino-based electronic system and uses commercially available components that meet project specifications. The equipment met the requirements for both the specifications and the low cost and will integrate the laboratories of the University of Mogi das Cruzes (UMC, Villa-Lobos campus, to carry out tests on polymer materials.

  9. SmallSats, Iodine Propulsion Technology, Applications to Low-Cost Lunar Missions, and the Iodine Satellite (iSAT) Project

    Science.gov (United States)

    Dankanich, John W.

    2014-01-01

    Closing Remarks: ?(1) SmallSats hold significant potential for future low cost high value missions; (2) Propulsion remains a key limiting capability for SmallSats that Iodine can address: High ISP * Density for volume constrained spacecraft; Indefinite quiescence, unpressurized and non-hazardous as a secondary payload; (3) Iodine enables MicroSat and SmallSat maneuverability: Enables transfer into high value orbits, constellation deployment and deorbit; (4) Iodine may enable a new class of planetary and exploration class missions: Enables GTO launched secondary spacecraft to transit to the moon, asteroids, and other interplanetary destinations for approximately 150 million dollars full life cycle cost including the launch; (5) ESPA based OTVs are also volume constrained and a shift from xenon to iodine can significantly increase the transfer vehicle change in volume capability including transfers from GTO to a range of Lunar Orbits; (6) The iSAT project is a fast pace high value iodine Hall technology demonstration mission: Partnership with NASA GRC and NASA MSFC with industry partner - Busek; (7) The iSAT mission is an approved project with PDR in November of 2014 and is targeting a flight opportunity in FY17.

  10. Low Cost Lithography Tool for High Brightness LED Manufacturing

    Energy Technology Data Exchange (ETDEWEB)

    Andrew Hawryluk; Emily True

    2012-06-30

    The objective of this activity was to address the need for improved manufacturing tools for LEDs. Improvements include lower cost (both capital equipment cost reductions and cost-ofownership reductions), better automation and better yields. To meet the DOE objective of $1- 2/kilolumen, it will be necessary to develop these highly automated manufacturing tools. Lithography is used extensively in the fabrication of high-brightness LEDs, but the tools used to date are not scalable to high-volume manufacturing. This activity addressed the LED lithography process. During R&D and low volume manufacturing, most LED companies use contact-printers. However, several industries have shown that these printers are incompatible with high volume manufacturing and the LED industry needs to evolve to projection steppers. The need for projection lithography tools for LED manufacturing is identified in the Solid State Lighting Manufacturing Roadmap Draft, June 2009. The Roadmap states that Projection tools are needed by 2011. This work will modify a stepper, originally designed for semiconductor manufacturing, for use in LED manufacturing. This work addresses improvements to yield, material handling, automation and throughput for LED manufacturing while reducing the capital equipment cost.

  11. Low Cost Polymer heat Exchangers for Condensing Boilers

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, Thomas [Brookhaven National Lab. (BNL), Upton, NY (United States); Trojanowski, Rebecca [Brookhaven National Lab. (BNL), Upton, NY (United States); Wei, George [Brookhaven National Lab. (BNL), Upton, NY (United States); Worek, Michael [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-09-30

    Work in this project sought to develop a suitable design for a low cost, corrosion resistant heat exchanger as part of a high efficiency condensing boiler. Based upon the design parameters and cost analysis several geometries and material options were explored. The project also quantified and demonstrated the durability of the selected polymer/filler composite under expected operating conditions. The core material idea included a polymer matrix with fillers for thermal conductivity improvement. While the work focused on conventional heating oil, this concept could also be applicable to natural gas, low sulfur heating oil, and biodiesel- although these are considered to be less challenging environments. An extruded polymer composite heat exchanger was designed, built, and tested during this project, demonstrating technical feasibility of this corrosion-resistant material approach. In such flue gas-to-air heat exchangers, the controlling resistance to heat transfer is in the gas-side convective layer and not in the tube material. For this reason, the lower thermal conductivity polymer composite heat exchanger can achieve overall heat transfer performance comparable to a metal heat exchanger. However, with the polymer composite, the surface temperature on the gas side will be higher, leading to a lower water vapor condensation rate.

  12. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  13. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  14. Evaluation of Risk Management Strategies for a Low-Cost, High-Risk Project

    Science.gov (United States)

    Shishko, Robert; Jorgensen, Edward J.

    1996-01-01

    This paper summarizes work in progress to define and implement a risk management process tailored to a low-cost, high-risk, NASA mission -the Microrover Flight Experiment (MFEX, commonly called the Mars microrover).

  15. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  16. What Causes Cost Overrun in Transport Infrastructure Projects?

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    cost escalation for three types of project ownership - private, state-owned enterprise and other public ownership - it is shown that the oft-seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. Type of accountability......This article presents results from the first statistically significant study of causes of cost escalation in transport infrastructure projects. The study is based on a sample of 258 rail, bridge, tunnel and roads projects worth US$90 billion. The focus is on the dependence of cost escalation on (1......) length of project implementation phase, (2) size of project and (3) type of project ownership. First, it is found with very high statistical significance that cost escalation is strongly dependent on length of implementation phase. The policy implications are clear: Decision makers and planners should...

  17. Academic entitlement in pharmacy education.

    Science.gov (United States)

    Cain, Jeff; Romanelli, Frank; Smith, Kelly M

    2012-12-12

    The constructs of academic entitlement and student consumerism refer to students' attitudes toward education as a commodity and the underlying belief that as consumers, they should be catered to and given the opportunity to participate in the education process according to their preferences. Most discussions regarding these attitudes are anecdotal, but the pervasiveness of these accounts and the troubling effects that ensue warrant attention. Grade inflation, student incivility, altered classroom practices, and decreased faculty morale are all potential aftereffects of teaching students who hold academic entitlement beliefs. Numerous factors are posited as attributing to academic entitlement including personal issues, societal pressures, and broad academic practices. This paper discusses these factors and offers faculty members and administrators recommendations regarding practices that may curb or alleviate issues associated with academically entitled students.

  18. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  19. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  20. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  1. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  2. Low-Cost IoT: A Holistic Approach

    Directory of Open Access Journals (Sweden)

    Augusto Ciuffoletti

    2018-05-01

    Full Text Available The key factors for a successful smart-city project are its initial cost and its scalability. The initial cost depends on several inter-related aspects that cannot be designed and optimized separately. After the pilot deployment, scaling-up takes place only if the cost remains affordable: an initial financial support may induce dependencies from technologies that become unsustainable in the long period. In addition, the initial adoption of an emerging technology that fails to affirm may jeopardize investment return. This paper investigates a smart-village use case, the success of which strongly depends on the initial cost and scalability, exploring a low-cost way for Internet of Things (IoT. We propose a simple conceptual framework for cost evaluation, and we verify its effectiveness with an exhaustive use case: a prototype sensor designed and tested with its surrounding eco-system. Using experimental results, we can estimate both performance and cost for a pilot system made of fifty sensors deployed in an urban area. We show that such cost grows linearly with system size, taking advantage of widely adopted technologies. The code and the design of the prototype are available, so that all steps are reproducible.

  3. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  4. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  5. An optimization algorithm for simulation-based planning of low-income housing projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2010-10-01

    Full Text Available Construction of low-income housing projects is a replicated process and is associated with uncertainties that arise from the unavailability of resources. Government agencies and/or contractors have to select a construction system that meets low-income housing projects constraints including project conditions, technical, financial and time constraints. This research presents a framework, using computer simulation, which aids government authorities and contractors in the planning of low-income housing projects. The proposed framework estimates the time and cost required for the construction of low-income housing using pre-cast hollow core with hollow blocks bearing walls. Five main components constitute the proposed framework: a network builder module, a construction alternative selection module, a simulation module, an optimization module and a reporting module. An optimization module utilizing a genetic algorithm enables the defining of different options and ranges of parameters associated with low-income housing projects that influence the duration and total cost of the pre-cast hollow core with hollow blocks bearing walls method. A computer prototype, named LIHouse_Sim, was developed in MS Visual Basic 6.0 as proof of concept for the proposed framework. A numerical example is presented to demonstrate the use of the developed framework and to illustrate its essential features.

  6. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  7. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  8. Xpider: Design and Development of a Low Cost VTOL UAV Platform

    Directory of Open Access Journals (Sweden)

    Oscar Higuera Rincon

    2013-01-01

    Full Text Available The main aim of the Xpider project is to analyse, design and develop a low-cost VTOL (Vertical Take Off and Landing UAV (unmanned aerial vehicle platform in order to provide a common architectural model for both embedded software and GCS (Ground Control Station software and communications system. This architectural model should be adaptable to any other hardware platforms or sensors. Some of the key points of the project were, on the one hand, the stabilization process using low-cost sensors and all the associated issues with low quality instruments, on the other hand the interface between the stabilization controller and the navigation controller, not forgetting the secure communication protocols. Additionally, as a side effect of the stabilization process analysis, a new metaheuristic optimization search algorithm has been developed to be used in PID (Proportional Integral Derivative controllercalibration tuning and has been successfully applied in the stabilization controller.

  9. HIV prevention costs and program scale: data from the PANCEA project in five low and middle-income countries

    Directory of Open Access Journals (Sweden)

    Stanley Nicci

    2007-07-01

    Full Text Available Abstract Background Economic theory and limited empirical data suggest that costs per unit of HIV prevention program output (unit costs will initially decrease as small programs expand. Unit costs may then reach a nadir and start to increase if expansion continues beyond the economically optimal size. Information on the relationship between scale and unit costs is critical to project the cost of global HIV prevention efforts and to allocate prevention resources efficiently. Methods The "Prevent AIDS: Network for Cost-Effectiveness Analysis" (PANCEA project collected 2003 and 2004 cost and output data from 206 HIV prevention programs of six types in five countries. The association between scale and efficiency for each intervention type was examined for each country. Our team characterized the direction, shape, and strength of this association by fitting bivariate regression lines to scatter plots of output levels and unit costs. We chose the regression forms with the highest explanatory power (R2. Results Efficiency increased with scale, across all countries and interventions. This association varied within intervention and within country, in terms of the range in scale and efficiency, the best fitting regression form, and the slope of the regression. The fraction of variation in efficiency explained by scale ranged from 26% – 96%. Doubling in scale resulted in reductions in unit costs averaging 34.2% (ranging from 2.4% to 58.0%. Two regression trends, in India, suggested an inflection point beyond which unit costs increased. Conclusion Unit costs decrease with scale across a wide range of service types and volumes. These country and intervention-specific findings can inform projections of the global cost of scaling up HIV prevention efforts.

  10. NetPICOmag: A low-cost networked magnetometer and its applications

    Science.gov (United States)

    Schofield, I.; Connors, M.; Russell, C. T.

    2012-03-01

    NetPICOmag (NPM) is the culmination of a design effort to build a compact, low-cost, laboratory-grade, networked magnetometer designed for remote autonomous operation, suited for research and education. NPM allows wide placement of magnetometers sensitive enough to detect auroral activity and the daily variation, and is suitable for education projects and a range of geophysical applications. The use of networked microcontrollers and GPS timing is applicable to other small instruments for field or local deployment, and an onboard data logging capability has also been demonstrated. We illustrate the value of the placement of low-cost magnetometers to increase coverage in an area through the study of a Pc 5 pulsation event which took place on September 4, 2010. By combining results with those from auroral zone magnetometers supporting the THEMIS project, we find that the phase velocity of these morning sector pulsations was northward on the ground. The event took place under very quiet solar wind conditions, and credible mapping associates it with the inner magnetosphere. Another aspect beyond increasing areal coverage is increasing density of coverage, which becomes feasible with instruments of very low cost. We examine aspects of the April 5, 2010 space weather event which are possible to deduce from closely spaced magnetometers.

  11. Project-Based Emissions Trading. The Impact of Institutional Arrangements on Cost-Effectiveness

    International Nuclear Information System (INIS)

    Woerdman, E.; Van der Gaast, W.

    2001-01-01

    In this paper we demonstrate that the institutional arrangement (or: design) of Joint Implementation (JI) and the Clean Development Mechanism (CDM) has a decisive impact on their cost-effectiveness. We illustrate our arguments by statistically analyzing the costs from 94 Activities Implemented Jointly (AIJ) pilot phase projects as well as by adjusting these data on the basis of simple mathematical formulas. These calculations explicitly take into account the institutional differences between JI (sinks, no banking) and the CDM (banking, no sinks) under the Kyoto Protocol and also show the possible effects on credit costs of alternative design options. However, our numerical illustrations should be viewed with caution, because AIJ is only to a limited extent representative of potential future JI and CDM projects and because credit costs are not credit prices. Some of the main figures found in this study are: an average cost figure per unit of emission reduction for AIJ projects of 46 dollar per ton of carbon dioxide equivalent ($/Mg CO 2 -eq), an average potential JI credit cost figure which is lowered to 37 $/Mg CO 2 -eq by introducing banking and an average of 6 $/Mg CO 2 -eq per credit for potential low-cost CDM projects which includes sinks. However, at CoP6 in November 2000 in The Hague (The Netherlands), the Parties to the Framework Convention on Climate Change (FCCC) did not (yet) reach consensus on the institutional details of the project-based mechanisms, such as the possible arrangement of early JI action or the inclusion of sinks under the CDM. 55 refs

  12. Cost comparison for REDC pretreatment project

    International Nuclear Information System (INIS)

    Robinson, S.M.; Homan, F.J.

    1997-06-01

    This analysis has been prepared to support the planned expenditure to provide the Radiochemical Engineering Development Center (REDC) with the capability to pretreat their liquid low-level waste (LLLW) before discharging it to the Oak Ridge National Laboratory (ORNL) LLLW system. Pretreatment will remove most of the radioactivity, particularly the transuranic isotopes and Cs-137 from the waste to be discharged. This will render the supernates that accumulate in the storage tanks low-activity Class B low-level wastes rather than high-activity Class B or Class C wastes. The sludges will be Class C rather than remote-handled transuranic (RH-TRU) wastes. When REDC wastes are commingled with other ORNL LLLW, the present-worth treatment and transport costs are higher by a factor of 1.3 for the no-pretreatment cases. This result is consistent with data from similar studies conducted at other sites. Based on the information presented in this analysis, the recommendation is to proceed with REDC treatment projects

  13. The Project Of Another Low-Cost Metaphase Finder

    International Nuclear Information System (INIS)

    Furukawa, Akira

    2016-01-01

    The most popular and 'gold standard' phenomenon in Biological dosimetry is the appearance of dicentric chromosomes in metaphase in white blood cells. The metaphase finder is a tool for biological dosimetry that finds metaphase cells on slide glasses. The author and a software company were using new special software that was faster than conventional systems. A Nikon Eclipse Ni-E microscope with motorised X-Y stage, 4x objective lens and 1920 x 1024 pixels colour camera for hardware were used. The software uses mathematical morphology filters. The new system was compact and low-priced. And the remarkable point is, this system can be applicable not only to human blood, but also to non-human samples. The speed was 208-236 s per 5 x 20 mm area, while capturing 378 images, which achieved the aim of the project. The false-positive ratio achieved below 5% in some slides. (author)

  14. Life cycle costs for disposal and assured isolation of low-level radioactive waste in Connecticut

    International Nuclear Information System (INIS)

    Chau, B.; Sutherland, A.A.; Baird, R.D.

    1998-03-01

    This document presents life cycle costs for a low-level radioactive disposal facility and a comparable assured isolation facility. Cost projections were based on general plans and assumptions, including volume projections and operating life, provided by the Connecticut Hazardous Waste Management Service, for a facility designed to meet the State's needs. Life cycle costs include the costs of pre-construction activities, construction, operations, closure, and post-closure institutional control. In order to provide a better basis for understanding the relative magnitude of near-term costs and future costs, the results of present value analysis of ut-year costs are provided

  15. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  16. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  17. Agentic and communal narcissism and satisfaction with life: The mediating role of psychological entitlement and self-esteem.

    Science.gov (United States)

    Żemojtel-Piotrowska, Magdalena A; Piotrowski, Jarosław P; Maltby, John

    2017-10-01

    This study examined the mediational role of self-esteem (as an enhancement) and psychological entitlement (as a cost) in the relationship between an agentic-communal model of grandiose narcissism and satisfaction with life. Two hundred and forty-eight university undergraduate students completed measures of agentic and communal narcissism, self-esteem, psychological entitlement and satisfaction with life. The findings suggest that there is support for the usefulness of the agentic-communal model of narcissism, and, consistent with predictions in the wider literature, self-esteem and psychological entitlement mediated the relationship between agentic-communal narcissism and life satisfaction. © 2015 International Union of Psychological Science.

  18. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  19. Array automated assembly task low cost silicon solar array project. Phase 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Clayton

    1980-12-01

    The initial contract was a Phase II Process Development for a process sequence, but with concentration on two particular process steps: laserscribing and spray-on junction formation. The add-on portion of the contract was to further develop these tasks, to incorporate spray-on of AR Coating and aluminum and to study the application of microwave energy to solar cell fabrication. The overall process cost projection is 97.918 cents/Wp. The major contributor to this excess cost is the module encapsulation materials cost. During the span of this contract the study of microwave application to solar cell fabrication produced the ability to apply this technique to any requirement of 600/sup 0/C or less. Above this temperature, non-uniformity caused the processing to be unreliable. The process sequence is described in detail, and a SAMICS cost analysis for each valid process step studied is presented. A temporary catalog for expense items is included, and engineering specifications for the process steps are given. (WHK)

  20. Low-complexity camera digital signal imaging for video document projection system

    Science.gov (United States)

    Hsia, Shih-Chang; Tsai, Po-Shien

    2011-04-01

    We present high-performance and low-complexity algorithms for real-time camera imaging applications. The main functions of the proposed camera digital signal processing (DSP) involve color interpolation, white balance, adaptive binary processing, auto gain control, and edge and color enhancement for video projection systems. A series of simulations demonstrate that the proposed method can achieve good image quality while keeping computation cost and memory requirements low. On the basis of the proposed algorithms, the cost-effective hardware core is developed using Verilog HDL. The prototype chip has been verified with one low-cost programmable device. The real-time camera system can achieve 1270 × 792 resolution with the combination of extra components and can demonstrate each DSP function.

  1. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  2. Low-Cost Phase Change Material for Building Envelopes

    Energy Technology Data Exchange (ETDEWEB)

    Abhari, Ramin [Renewable Energy Group

    2015-08-06

    A low-cost PCM process consisting of conversion of fats and oils to PCM-range paraffins, and subsequent “encapsulation” of the paraffin using conventional plastic compounding/pelletizing equipment was demonstrated. The PCM pellets produced were field-tested in a building envelope application. This involved combining the PCM pellets with cellulose insulation, whereby 33% reduction in peak heat flux and 12% reduction in heat gain was observed (average summertime performance). The selling price of the PCM pellets produced according to this low-cost process is expected to be in the $1.50-$3.00/lb range, compared to current encapsulated PCM price of about $7.00/lb. Whole-building simulations using corresponding PCM thermal analysis data suggest a payback time of 8 to 16 years (at current energy prices) for an attic insulation retrofit project in the Phoenix climate area.

  3. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  4. Contrast in low-cost operational concepts for orbiting satellites

    Science.gov (United States)

    Walyus, Keith D.; Reis, James; Bradley, Arthur J.

    2002-12-01

    Older spacecraft missions, especially those in low Earth orbit with telemetry intensive requirements, required round-the-clock control center staffing. The state of technology relied on control center personnel to continually examine data, make decisions, resolve anomalies, and file reports. Hubble Space Telescope (HST) is a prime example of this description. Technological advancements in hardware and software over the last decade have yielded increases in productivity and operational efficiency, which result in lower cost. The re-engineering effort of HST, which has recently concluded, utilized emerging technology to reduce cost and increase productivity. New missions, of which NASA's Transition Region and Coronal Explorer Satellite (TRACE) is an example, have benefited from recent technological advancements and are more cost-effective than when HST was first launched. During its launch (1998) and early orbit phase, the TRACE Flight Operations Team (FOT) employed continually staffed operations. Yet once the mission entered its nominal phase, the FOT reduced their staffing to standard weekday business hours. Operations were still conducted at night and during the weekends, but these operations occurred autonomously without compromising their high standards for data collections. For the HST, which launched in 1990, reduced cost operations will employ a different operational concept, when the spacecraft enters its low-cost phase after its final servicing mission in 2004. Primarily due to the spacecraft"s design, the HST Project has determined that single-shift operations will introduce unacceptable risks for the amount of dollars saved. More importantly, significant cost-savings can still be achieved by changing the operational concept for the FOT, while still maintaining round-the-clock staffing. It"s important to note that the low-cost solutions obtained for one satellite may not be applicable for other satellites. This paper will contrast the differences between

  5. Entitlement and organizational behaviors: the moderating role of narcissism

    Directory of Open Access Journals (Sweden)

    Agata Szalkowska

    2015-10-01

    Full Text Available Background The purpose of this study was to investigate the relationship between psychological entitlement (active, passive, and revenge, narcissism and two types of organizational behaviors in employees. Interactions between narcissism and psychological entitlement as predictors of organizational citizenship behaviors (OCB and counterproductive work behaviors (CWB were explored. Predictors were analyzed in an effort to determine whether psychological entitlement plays a more destructive role among narcissistic employees than among non-narcissistic ones and whether the effects of narcissism on OCB and CWB are mediated by entitlement. Participants and procedure Data were obtained from 100 employees (34% men aged 22 to 59 years (M = 37.00, SD = 9.30 from public and private companies. Participants were asked to complete the Organizational Citizenship Behavior Scale (OCBS, the Counterproductive Organizational Behaviors Scale (COBS, the Entitlement Questionnaire, and the Narcissistic Personality Inventory (NPI. Results Positive aspects of entitlement were positively associated with OCB only among narcissistic employees, and active entitlement mediated the effects of narcissism on CWB. Active entitlement was negatively related to CWB. Negative aspects of entitlement were negatively related to OCB and unrelated to CWB. Conclusions This study provides evidence for positive (healthy aspects of entitlement for organizations. The unexpected interaction between narcissism and entitlement in predicting higher levels of OCB suggests that among narcissistic employees, healthy aspects of entitlement are desirable and profitable for an organization. Psychological entitlement was observed to be an important predictor of organizational behaviors beyond narcissism itself.

  6. Digital Image Quantitative Evaluations for Low Cost Film Digitizers Height Determination

    International Nuclear Information System (INIS)

    Khairul Anuar Mohd Salleh; Arshad Yassin; Ahmad Nasir Yusof; Noorhazleena Azaman

    2016-01-01

    Non Destructive Testing (NDT) technology contributes significant improvement to the quality of industrial products, and the integrity of equipment and plants. Introduction of powerful computers and reliable imaging technology has had significant impact on the traditional nuclear based NDT technology. Demand for faster, reliable, low cost, and flexible technology is rapidly increased. With the growing demand for more efficient digital archiving, digital image analysis, and reporting results with a low cost technology, one cannot deny the importance of having another cheaper solution. This project will apply fundamental principle of image digitization to be used in building up a low cost film digitization solution. The height of the film digitization was carefully determined by examining each digital images produced. Three (3) repetitive quantitative evaluations (Modulation Transfer Function [MTF], Characteristic Transfer Curve [CTC], and Contrast to Noise Ratio [CNR]) were performed at different condition to assist with the determination of the low cost film digitizers height. All 3 evaluations were successfully applied and the most appropriate height was successfully determined. (author)

  7. Identifying Two Groups of Entitled Individuals: Cluster Analysis Reveals Emotional Stability and Self-Esteem Distinction.

    Science.gov (United States)

    Crowe, Michael L; LoPilato, Alexander C; Campbell, W Keith; Miller, Joshua D

    2016-12-01

    The present study hypothesized that there exist two distinct groups of entitled individuals: grandiose-entitled, and vulnerable-entitled. Self-report scores of entitlement were collected for 916 individuals using an online platform. Model-based cluster analyses were conducted on the individuals with scores one standard deviation above mean (n = 159) using the five-factor model dimensions as clustering variables. The results support the existence of two groups of entitled individuals categorized as emotionally stable and emotionally vulnerable. The emotionally stable cluster reported emotional stability, high self-esteem, more positive affect, and antisocial behavior. The emotionally vulnerable cluster reported low self-esteem and high levels of neuroticism, disinhibition, conventionality, psychopathy, negative affect, childhood abuse, intrusive parenting, and attachment difficulties. Compared to the control group, both clusters reported being more antagonistic, extraverted, Machiavellian, and narcissistic. These results suggest important differences are missed when simply examining the linear relationships between entitlement and various aspects of its nomological network.

  8. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  9. Scalable Light Module for Low-Cost, High-Efficiency Light- Emitting Diode Luminaires

    Energy Technology Data Exchange (ETDEWEB)

    Tarsa, Eric [Cree, Inc., Goleta, CA (United States)

    2015-08-31

    During this two-year program Cree developed a scalable, modular optical architecture for low-cost, high-efficacy light emitting diode (LED) luminaires. Stated simply, the goal of this architecture was to efficiently and cost-effectively convey light from LEDs (point sources) to broad luminaire surfaces (area sources). By simultaneously developing warm-white LED components and low-cost, scalable optical elements, a high system optical efficiency resulted. To meet program goals, Cree evaluated novel approaches to improve LED component efficacy at high color quality while not sacrificing LED optical efficiency relative to conventional packages. Meanwhile, efficiently coupling light from LEDs into modular optical elements, followed by optimally distributing and extracting this light, were challenges that were addressed via novel optical design coupled with frequent experimental evaluations. Minimizing luminaire bill of materials and assembly costs were two guiding principles for all design work, in the effort to achieve luminaires with significantly lower normalized cost ($/klm) than existing LED fixtures. Chief project accomplishments included the achievement of >150 lm/W warm-white LEDs having primary optics compatible with low-cost modular optical elements. In addition, a prototype Light Module optical efficiency of over 90% was measured, demonstrating the potential of this scalable architecture for ultra-high-efficacy LED luminaires. Since the project ended, Cree has continued to evaluate optical element fabrication and assembly methods in an effort to rapidly transfer this scalable, cost-effective technology to Cree production development groups. The Light Module concept is likely to make a strong contribution to the development of new cost-effective, high-efficacy luminaries, thereby accelerating widespread adoption of energy-saving SSL in the U.S.

  10. Low cost balancing unit design

    Science.gov (United States)

    Golembiovsky, Matej; Dedek, Jan; Slanina, Zdenek

    2017-06-01

    This article deals with the design of a low-cost balancing system which consist of battery balancing units, accumulator pack units and coordinator unit with interface for higher level of battery management system. This solution allows decentralized mode of operation and the aim of this work is implementation of controlling and diagnostic mechanism into an electric scooter project realized at Technical university of Ostrava. In todays world which now fully enjoys the prime of electromobility, off-grid battery systems and other, it is important to seek the optimal balance between functionality and the economy side of BMS that being electronics which deals with secondary cells of batery packs. There were numerous sophisticated, but not too practical BMS models in the past, such as centralized system or standalone balance modules of individual cells. This article aims at development of standalone balance modules which are able to communicate with the coordinator, adjust their parameters and ensure their cells safety in case of a communication failure. With the current worldwide cutting cost trend in mind, the emphasis was put on the lowest price possible for individual component. The article is divided into two major categories, the first one being desing of power electronics with emphasis on quality, safety (cooling) and also cost. The second part describes development of a communication interface with reliability and cost in mind. The article contains numerous graphs from practical measurements. The outcome of the work and its possible future is defined in the conclusion.

  11. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  12. Low-cost universal stereoscopic virtual reality interfaces

    Science.gov (United States)

    Starks, Michael R.

    1993-09-01

    Low cost stereoscopic virtual reality hardware interfacing with nearly any computer and stereoscopic software running on any PC is described. Both are user configurable for serial or parallel ports. Stereo modeling, rendering, and interaction via gloves or 6D mice are provided. Low cost LCD Visors and external interfaces represent a breakthrough in convenience and price/performance. A complete system with software, Visor, interface and Power Glove is under $DOL500. StereoDrivers will interface with any system giving video sync (e.g., G of RGB). PC3D will access any standard serial port, while PCVR works with serial or parallel ports and glove devices. Model RF Visors detect magnetic fields and require no connection to the system. PGSI is a microprocessor control for the Power Glove and Visors. All interfaces will operate to 120 Hz with Model G Visors. The SpaceStations are demultiplexing, field doubling devices which convert field sequential video or graphics for stereo display with dual video projection or dual LCD SpaceHelmets.

  13. Student Entitlement Models in Australia's National Training System: Expert Views. Occasional Paper

    Science.gov (United States)

    Bowman, Kaye; McKenna, Suzy

    2016-01-01

    This occasional paper provides the views of 17 "thought leaders" in the Australian vocational education and training (VET) sector. Their insight and opinions were sought to inform a larger research project focused on the student entitlement reforms that were introduced into the national VET system from 2012. These individuals offered a…

  14. Reforming Equalization: Balancing Efficiency, Entitlement and Ownership

    Directory of Open Access Journals (Sweden)

    Bev Dahlby

    2014-08-01

    Full Text Available In this paper, we provide an overview of the equalization grant system in Canada and the issues that have been raised concerning the reform of the fiscal transfer system. Any reforms to the equalization grant system have to balance three concerns — “efficiency” effects that arise through federal financing of transfers, and the incentive effects on provincial fiscal policies, “entitlement” to reasonably comparable public services at reasonably comparable levels of taxation, and “ownership” of resources and independence of fiscal policies by provincial governments. Five proposals for reform of the equalization system are discussed. With regard to the inclusion rate for resource revenues in equalization formula, we argue that the rate should be reduced from 50 per cent to 25 per cent and that ceiling on total equalization payments should be eliminated. We argue against the proposal to exempt from the calculation of equalization entitlements that are deposited in provincial sovereign wealth funds because this would not reduce total equalization entitlements in present value terms, it would be complex to implement if it extended to all forms of savings by provinces (such as debt reduction, and it would not alter the resource rich provinces’ incentives to save more of their resource revenues. We argue against a proposal to reduce CHT and CST to provinces with above average fiscal capacities because this would reduce their incentive to develop and tax their resources, and it would be counter to the purpose of these block grants, which is to reduce the vertical fiscal imbalance between the federal and the provincial governments. We review the Gusen (2012a proto-type model for incorporating variations in costs and needs in the computation of the equalization entitlements and argue that this procedure seems feasible and merits further analysis.

  15. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  16. Low Cost High-H2 Syngas Production for Power and Liquid Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, S. James [Gas Technology Inst., Des Plaines, IL (United States)

    2015-07-31

    This report summarizes the technical progress made of the research project entitledLow Cost High-H2 Syngas Production for Power and Liquid Fuels,” under DOE Contract No. DE-FE-0011958. The period of performance was October 1, 2013 through July 30, 2015. The overall objectives of this project was to determine the technical and economic feasibility of a systems approach for producing high hydrogen syngas from coal with the potential to reduce significantly the cost of producing power, chemical-grade hydrogen or liquid fuels, with carbon capture to reduce the environmental impact of gasification. The project encompasses several areas of study and the results are summarized here. (1) Experimental work to determine the technical feasibility of a novel hybrid polymer/metal H2-membrane to recover pure H2 from a coal-derived syngas was done. This task was not successful. Membranes were synthesized and show impermeability of any gases at required conditions. The cause of this impermeability was most likely due to the densification of the porous polymer membrane support made from polybenzimidazole (PBI) at test temperatures above 250 °C. (2) Bench-scale experimental work was performed to extend GTI's current database on the University of California Sulfur Recovery Process-High Pressure (UCSRP-HP) and recently renamed Sulfur Removal and Recovery (SR2) process for syngas cleanup including removal of sulfur and other trace contaminants, such as, chlorides and ammonia. The SR2 process tests show >90% H2S conversion with outlet H2S concentrations less than 4 ppmv, and 80-90% ammonia and chloride removal with high mass transfer rates. (3) Techno-economic analyses (TEA) were done for the production of electric power, chemical-grade hydrogen and diesel fuels, from a mixture of coal- plus natural gas-derived syngas using the Aerojet Rocketdyne (AR) Advanced Compact coal gasifier and a natural gas partial oxidation reactor (POX) with SR2 technology. Due to the unsuccessful

  17. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  18. Low-Cost Superconducting Wire for Wind Generators: High Performance, Low Cost Superconducting Wires and Coils for High Power Wind Generators

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    REACT Project: The University of Houston will develop a low-cost, high-current superconducting wire that could be used in high-power wind generators. Superconducting wire currently transports 600 times more electric current than a similarly sized copper wire, but is significantly more expensive. The University of Houston’s innovation is based on engineering nanoscale defects in the superconducting film. This could quadruple the current relative to today’s superconducting wires, supporting the same amount of current using 25% of the material. This would make wind generators lighter, more powerful and more efficient. The design could result in a several-fold reduction in wire costs and enable their commercial viability of high-power wind generators for use in offshore applications.

  19. Low-cost high purity production

    Science.gov (United States)

    Kapur, V. K.

    1978-01-01

    Economical process produces high-purity silicon crystals suitable for use in solar cells. Reaction is strongly exothermic and can be initiated at relatively low temperature, making it potentially suitable for development into low-cost commercial process. Important advantages include exothermic character and comparatively low process temperatures. These could lead to significant savings in equipment and energy costs.

  20. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  1. 42 CFR 31.11 - Persons entitled to treatment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Persons entitled to treatment. 31.11 Section 31.11... § 31.11 Persons entitled to treatment. To the extent and under the circumstances prescribed in this part, the following persons shall be entitled to medical, surgical, and dental treatment and...

  2. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  3. Preliminary estimate of the costs involved in the implantation of a low and medium level radioactive waste repository in Brazil

    International Nuclear Information System (INIS)

    Branco, Otavio E.A.; Carvalho Filho, Carlos A.; Ferreira, Vinicius V.M.; Alves, Paulo R.R.

    2009-01-01

    One relevant subject in the decision making process linked to the implantation of a low and intermediate level waste (LILW) repository in Brazil is regarding to the project expected costs. It is important to estimate in a solid way the total and partial costs expected, considering each one of the enterprise implantation phases. This work shows an initial estimative of these costs, based on reports and papers that evaluate the implantation, operation, closure and post closure costs of radioactive LILW waste repositories. In the development of this research only the costs regarding to near surface repositories, or similar ones, were considered. The total cost was estimated as approximately 115 million dollars, considering the whole project lifetime as 300 years. Considering the repository start-up costs (site selection, licensing, project and construction), the total value is estimated as 48 million dollars (1600 dollars/m 3 ). It is important to emphasize that some cares should be taken when costs obtained from the acquired experience by another countries in the repositories development are analyzed. As example, the costs for disposal 1 m 3 of low and medium level radioactive waste vary significantly from one country to another, even when repositories with similar projects are compared. Also the total costs of construction and licensing are significantly higher when compared those ones from 'conventional' facilities with similar technological characteristics. Finally, although about a dozen low and medium level radioactive waste repository are operating in Europe, new projects should be faced, as the international practice demonstrate, as original developments. (author)

  4. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  5. 43 CFR 426.5 - Ownership entitlement.

    Science.gov (United States)

    2010-10-01

    ... nonexempt land; (ii) Married couples who hold equal interests are entitled to receive irrigation water on a... entitled to receive irrigation water on that land owned jointly in marriage up to a maximum of 320 acres of... tenant, provided each tenant holds an equal interest in the tenancy; (vi) Partnerships subject to prior...

  6. 20 CFR 725.219 - Duration of entitlement; child.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Duration of entitlement; child. 725.219... of entitlement; child. (a) An individual is entitled to benefits as a child for each month beginning... month in which any one of the following events first occurs: (1) The child dies; (2) The child marries...

  7. Silicon web process development. [for low cost solar cells

    Science.gov (United States)

    Duncan, C. S.; Hopkins, R. H.; Seidensticker, R. G.; Mchugh, J. P.; Hill, F. E.; Heimlich, M. E.; Driggers, J. M.

    1979-01-01

    Silicon dendritic web, a single crystal ribbon shaped during growth by crystallographic forces and surface tension (rather than dies), is a highly promising base material for efficient low cost solar cells. The form of the product smooth, flexible strips 100 to 200 microns thick, conserves expensive silicon and facilitates automation of crystal growth and the subsequent manufacturing of solar cells. These characteristics, coupled with the highest demonstrated ribbon solar cell efficiency-15.5%-make silicon web a leading candidate to achieve, or better, the 1986 Low Cost Solar Array (LSA) Project cost objective of 50 cents per peak watt of photovoltaic output power. The main objective of the Web Program, technology development to significantly increase web output rate, and to show the feasibility for simultaneous melt replenishment and growth, have largely been accomplished. Recently, web output rates of 23.6 sq cm/min, nearly three times the 8 sq cm/min maximum rate of a year ago, were achieved. Webs 4 cm wide or greater were grown on a number of occassions.

  8. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  9. 20 CFR 725.218 - Conditions of entitlement; child.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Conditions of entitlement; child. 725.218... Conditions of entitlement; child. (a) An individual is entitled to benefits where he or she meets the... the child of a deceased miner who: (1) Was receiving benefits under section 415 or part C of title IV...

  10. 20 CFR 410.212 - Conditions of entitlement; child.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Conditions of entitlement; child. 410.212...; Filing of Claims and Evidence § 410.212 Conditions of entitlement; child. (a) An individual is entitled to benefits if such individual: (1) Is the child or stepchild (see § 410.330) of (i) a deceased miner...

  11. 20 CFR 410.213 - Duration of entitlement; child.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Duration of entitlement; child. 410.213...; Filing of Claims and Evidence § 410.213 Duration of entitlement; child. (a) An individual is entitled to benefits as a child for each month beginning with the first month in which all of the conditions of...

  12. Low-cost domestic water filter: The case for a process-based ...

    African Journals Online (AJOL)

    Low-cost domestic water filter: The case for a process-based approach for the development of a rural technology product. ... Since the project aims at technology transfer to the rural poor for generating rural livelihoods, appropriate financial models and the general sustainability issues for such an activity are briefly discussed ...

  13. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  14. Academic Entitlement and Academic Performance in Graduating Pharmacy Students

    OpenAIRE

    Jeffres, Meghan N.; Barclay, Sean M.; Stolte, Scott K.

    2014-01-01

    Objectives. To determine a measurable definition of academic entitlement, measure academic entitlement in graduating doctor of pharmacy (PharmD) students, and compare the academic performance between students identified as more or less academically entitled.

  15. Satellite-aided survey sampling and implementation in low- and middle-income contexts: a low-cost/low-tech alternative.

    Science.gov (United States)

    Haenssgen, Marco J

    2015-01-01

    The increasing availability of online maps, satellite imagery, and digital technology can ease common constraints of survey sampling in low- and middle-income countries. However, existing approaches require specialised software and user skills, professional GPS equipment, and/or commercial data sources; they tend to neglect spatial sampling considerations when using satellite maps; and they continue to face implementation challenges analogous to conventional survey implementation methods. This paper presents an alternative way of utilising satellite maps and digital aides that aims to address these challenges. The case studies of two rural household surveys in Rajasthan (India) and Gansu (China) compare conventional survey sampling and implementation techniques with the use of online map services such as Google, Bing, and HERE maps. Modern yet basic digital technology can be integrated into the processes of preparing, implementing, and monitoring a rural household survey. Satellite-aided systematic random sampling enhanced the spatial representativeness of the village samples and entailed savings of approximately £4000 compared to conventional household listing, while reducing the duration of the main survey by at least 25 %. This low-cost/low-tech satellite-aided survey sampling approach can be useful for student researchers and resource-constrained research projects operating in low- and middle-income contexts with high survey implementation costs. While achieving transparent and efficient survey implementation at low costs, researchers aiming to adopt a similar process should be aware of the locational, technical, and logistical requirements as well as the methodological challenges of this strategy.

  16. Teaching Rational Entitlement and Responsibility: A Socratic Exercise

    Directory of Open Access Journals (Sweden)

    David Godden

    2014-02-01

    Full Text Available The paper reports on a Socratic exercise that introduces participants to the norm of rational entitlement, as distinct from political entitlement, and the attendant norm of rational responsibility. The exercise demonstrates that, because participants are not willing to exchange their own opinion at random for another differing opinion to which the owner is, by the participants’ own admission, entitled, they treat their entitlement to their own opinion differently, giving it a special status. This gives rise to rational obligations such as the obligation to provide reasons, and a willingness to risk those opinions to the force of the better reason.

  17. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  18. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  19. Additive Manufacturing of Low Cost Upper Stage Propulsion Components

    Science.gov (United States)

    Protz, Christopher; Bowman, Randy; Cooper, Ken; Fikes, John; Taminger, Karen; Wright, Belinda

    2014-01-01

    NASA is currently developing Additive Manufacturing (AM) technologies and design tools aimed at reducing the costs and manufacturing time of regeneratively cooled rocket engine components. These Low Cost Upper Stage Propulsion (LCUSP) tasks are funded through NASA's Game Changing Development Program in the Space Technology Mission Directorate. The LCUSP project will develop a copper alloy additive manufacturing design process and develop and optimize the Electron Beam Freeform Fabrication (EBF3) manufacturing process to direct deposit a nickel alloy structural jacket and manifolds onto an SLM manufactured GRCop chamber and Ni-alloy nozzle. In order to develop these processes, the project will characterize both the microstructural and mechanical properties of the SLMproduced GRCop-84, and will explore and document novel design techniques specific to AM combustion devices components. These manufacturing technologies will be used to build a 25K-class regenerative chamber and nozzle (to be used with tested DMLS injectors) that will be tested individually and as a system in hot fire tests to demonstrate the applicability of the technologies. These tasks are expected to bring costs and manufacturing time down as spacecraft propulsion systems typically comprise more than 70% of the total vehicle cost and account for a significant portion of the development schedule. Additionally, high pressure/high temperature combustion chambers and nozzles must be regeneratively cooled to survive their operating environment, causing their design to be time consuming and costly to build. LCUSP presents an opportunity to develop and demonstrate a process that can infuse these technologies into industry, build competition, and drive down costs of future engines.

  20. Low-cost rural surface alternatives : demonstration project.

    Science.gov (United States)

    2015-06-01

    The goals of this project were to implement several stabilization methods for preventing or mitigating freeze-thaw damage to : granular surfaced roads and identify the most effective and economical methods for the soil and climate conditions of Iowa....

  1. Low-cost silicon wafer dicing using a craft cutter

    KAUST Repository

    Fan, Yiqiang

    2014-05-20

    This paper reports a low-cost silicon wafer dicing technique using a commercial craft cutter. The 4-inch silicon wafers were scribed using a crafter cutter with a mounted diamond blade. The pre-programmed automated process can reach a minimum die feature of 3 mm by 3 mm. We performed this scribing process on the top polished surface of a silicon wafer; we also created a scribing method for the back-unpolished surface in order to protect the structures on the wafer during scribing. Compared with other wafer dicing methods, our proposed dicing technique is extremely low cost (lower than $1,000), and suitable for silicon wafer dicing in microelectromechanical or microfluidic fields, which usually have a relatively large die dimension. The proposed dicing technique is also usable for dicing multiple project wafers, a process where dies of different dimensions are diced on the same wafer.

  2. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  3. Low-Cost Gas Heat Pump for Building Space Heating

    Energy Technology Data Exchange (ETDEWEB)

    Garrabrant, Michael [Stone Mountain Technologies, Inc., Johnson City, TN (United States); Keinath, Christopher [Stone Mountain Technologies, Inc., Johnson City, TN (United States)

    2016-10-11

    Gas-fired residential space heating in the U.S is predominantly supplied by furnaces and boilers. These technologies have been approaching their thermodynamic limit over the past 30 years and improvements for high efficiency units have approached a point of diminishing return. Electric heat pumps are growing in popularity but their heating performance at low ambient temperatures is poor. The development of a low-cost gas absorption heat pump would offer a significant improvement to current furnaces and boilers, and in heating dominated climate zones when compared to electric heat pumps. Gas absorption heat pumps (GAHP) exceed the traditional limit of thermal efficiency encountered by typical furnaces and boilers, and maintain high levels of performance at low ambient temperatures. The project team designed and demonstrated two low-cost packaged prototype GAHP space heating systems during the course of this investigation. Led by Stone Mountain Technologies Inc. (SMTI), with support from A.O. Smith, and the Gas Technology Institute (GTI), the cross-functional team completed research and development tasks including cycle modeling, 8× scaling of a compact solution pump, combustion system development, breadboard evaluation, fabrication of two packaged prototype units, third party testing of the first prototype, and the evaluation of cost and energy savings compared to high and minimum efficiency gas options. Over the course of the project and with the fabrication of two Alpha prototypes it was shown that this technology met or exceeded most of the stated project targets. At ambient temperatures of 47, 35, 17 and -13°F the prototypes achieved gas based coefficients of performance of 1.50, 1.44, 1.37, and 1.17, respectively. Both units operated with parasitic loads well below the 750 watt target with the second Alpha prototype operating 75-100 watts below the first Alpha prototype. Modulation of the units at 4:1 was achieved with the project goal of 2:1 modulation

  4. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  5. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  6. Low Cost Solar Array Project. Feasibility of the silane process for producing semiconductor-grade silicon. Final report, October 1975-March 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The commercial production of low-cost semiconductor-grade silicon is an essential requirement of the JPL/DOE (Department of Energy) Low-Cost Solar Array (LSA) Project. A 1000-metric-ton-per-year commercial facility using the Union Carbide Silane Process will produce molten silicon for an estimated price of $7.56/kg (1975 dollars, private financing), meeting the DOE goal of less than $10/kg. Conclusions and technology status are reported for both contract phases, which had the following objectives: (1) establish the feasibility of Union Carbide's Silane Process for commercial application, and (2) develop an integrated process design for an Experimental Process System Development Unit (EPSDU) and a commercial facility, and estimate the corresponding commercial plant economic performance. To assemble the facility design, the following work was performed: (a) collection of Union Carbide's applicable background technology; (b) design, assembly, and operation of a small integrated silane-producing Process Development Unit (PDU); (c) analysis, testing, and comparison of two high-temperature methods for converting pure silane to silicon metal; and (d) determination of chemical reaction equilibria and kinetics, and vapor-liquid equilibria for chlorosilanes.

  7. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  8. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  9. Low cost solar air heater

    International Nuclear Information System (INIS)

    Gill, R.S.; Singh, Sukhmeet; Singh, Parm Pal

    2012-01-01

    Highlights: ► Single glazed low cost solar air heater is more efficient during summer while double glazed is better in winter. ► For the same initial investment, low cost solar air heaters collect more energy than packed bed solar air heater. ► During off season low cost solar air heater can be stored inside as it is light in weight. - Abstract: Two low cost solar air heaters viz. single glazed and double glazed were designed, fabricated and tested. Thermocole, ultraviolet stabilised plastic sheet, etc. were used for fabrication to reduce the fabrication cost. These were tested simultaneously at no load and with load both in summer and winter seasons along with packed bed solar air heater using iron chips for absorption of radiation. The initial costs of single glazed and double glazed are 22.8% and 26.8% of the initial cost of packed bed solar air heater of the same aperture area. It was found that on a given day at no load, the maximum stagnation temperatures of single glazed and double glazed solar air heater were 43.5 °C and 62.5 °C respectively. The efficiencies of single glazed, double glazed and packed bed solar air heaters corresponding to flow rate of 0.02 m 3 /s-m 2 were 30.29%, 45.05% and 71.68% respectively in winter season. The collector efficiency factor, heat removal factor based on air outlet temperature and air inlet temperature for three solar air heaters were also determined.

  10. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  11. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  12. Project feasibility and mine production costs

    Energy Technology Data Exchange (ETDEWEB)

    Longworth, C R

    1987-01-01

    The paper outlines the present investment environment existing in the Australian Coal Industry and places this in the context of the current world seaborne coal trade. Those factors which have the greatest influence on the viability of coal projects today, namely coal prices and quality, exchange rates, cash cost of production, capital and borrowing costs, infrastructure and government charges are dealt with briefly. The paper concludes by giving a schedule of those factors of a local character which can be changed to render projects more competitive and also presents some external factors beyond Australia's control which will, in part, influence the development of the industry in the next decade. 4 refs., 8 figs.

  13. Project Minerva: A low-cost manned Mars mission based on indigenous propellant production

    Science.gov (United States)

    Bruckner, Adam P.; Anderson, Hobie; Caviezel, Kelly; Daggert, Todd; Folkers, Mike; Fornia, Mark; Hamling, Steven; Johnson, Bryan; Kalberer, Martin; Machula, Mike

    1992-01-01

    Project Minerva is a low-cost manned Mars mission designed to deliver a crew of four to the Martian surface, using only two sets of two launches. Key concepts which make this mission realizable are the use of near-term technologies and in-situ propellant production, following the senario originally proposed by R. Zubrin of Martin Marietta. The first set of launches delivers two unmanned payloads into low earth orbit (LEO): one consists of an Earth Return Vehicle (ERV), a propellant production plant, and a set of robotic vehicles, and the second consists of the upper stage/trans-Mars injection (TMI) booster. In LEO, the two payloads are joined and inserted into a Mars transfer orbit. The landing on Mars is performed with the aid of multiple aerobraking maneuvers. On the Martian surface, the propellant production plant uses a Sabatier/electrolysis-type process to combine six tons of hydrogen brought from earth with carbon dioxide from the Martian atmosphere to produce 100 tons of liquid oxygen and methane, which are later used as the propellants for the rover expeditions and the manned return journey of the ERV. Once the in-situ propellant production is completed, approximately two years after the first set of launches, the manned portion of the mission leaves earth. This set of two launches is similar to that of the unmanned vehicles; the two payloads are the Manned Transfer Vehicle (MTV) and the upper stage/TMI booster. The MTV contains the manned rover and the habitat which houses the astronauts enroute to Mars and on the Martian surface. During the 180-day trip to Mars, artificial gravity is created by tethering the MTV to the TMI booster and inducing rotation. Upon arrival the MTV performs aerobraking maneuvers to land near the fully-fueled ERV, which will be used by the crew a year and a half later to return to earth. The mission entails moderate travel times with relatively low-energy conjunction-class trajectories and allows ample time for scientific

  14. Cost of common low back pain and lumbar radiculopathy in rheumatologic consultation in Lomé.

    Science.gov (United States)

    Fianyo, Eyram; Oniankitan, Owonayo; Tagbor Komi, C; Kakpovi, Kodjo; Houzou, Prénam; Koffi-Tessio Viwalé, E S; Mijiyawa, Moustafa

    2017-03-01

    The cost of low back pain was the subject of few studies in black Africa. To assess the cost of common low back pain and lumbar radiculopathy in Lomé. A six months study was realised in the rheumatologic department of CHU Sylvanus Olympio. 103 consecutive patients suffering from a common low back pain or lumbar radiculopathy were included. To assess direct, indirect and non-financial costs they were questioned about their expense during the year. Financial cost of common low back pain and lumbar radiculopathy amounted to 107.2 $ US (extremes: 5.8 and 726.1 $ US). This amount, quadruple of guaranteed minimum wage, felled under two headings: direct cost (56.3 $ US; 53% of total sum), indirect cost (50.3 $ US; 47% of total sum). Non-financial cost were: disruption in daily activities (94%), impact in emotional and sexual life (59%), impact on the family's budget (69%), abandon of family's projects (58%) or of leisure (42%). In black Africa top priority is given to the fight against infectious diseases those cause an important mortality. But common low back pain and lumbar radiculopathy, those have social and economic impact, should be given more attention.

  15. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  16. a Precise, Low-Cost Rtk Gnss System for Uav Applications

    Science.gov (United States)

    Stempfhuber, W.; Buchholz, M.

    2011-09-01

    High accuracy with real-time positioning of moving objects has been considered a standard task of engineering geodesy for 10 to 15 years. An absolute positioning accuracy of 1-3 cm is generally possible worldwide and is further used in many areas of machine guidance (machine control and guidance), and farming (precision farming) as well as for various special applications (e.g. railway trolley, mining, etc.). The cost of the measuring instruments required for the use of geodetic L1/L2 receivers with a local reference station amounts to approximately USD 30,000 to 50,000. Therefore, dual frequency RTK GNSS receivers are not used in the mass market. Affordable GPS/GNSS modules have already reached the mass market in various areas such as mobile phones, car navigation, the leisure industry, etc. Kinematic real-time positioning applications with centimetre or decimetre levels could also evolve into a mass product. In order for this to happen, the costs for such systems must lie between USD 1,000 to 2,000. What exactly low-cost means is determined by the precise specifications of the given individual application. Several university studies in geodesy focus on the approach of high-accuracy positioning by means of single frequency receivers for static applications [e.g. GLABSCH et. al. 2009, SCHWIEGER and GLÄSER 2005, ALKAN 2010, REALINI et. al. 2010, KORTH and HOFMANN 2011]. Although intelligent approaches have been developed that compute a trajectory in the post-processing mode [REALINI et. al., 2010], at present, there are only a very few GNSS Low-Cost Systems that enable real-time processing. This approach to precise position determination by means of the computation of static raw data with single frequency receivers is currently being explored in a research project at the Beuth Hochschule für Technik Berlin - and is being further developed for kinematic applications. The project is embedded in the European Social Fund. It is a follow-up project in the area of

  17. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  18. Personality, Self-Regulated Learning, and Academic Entitlement

    Science.gov (United States)

    McLellan, Chelsea K.; Jackson, Dennis L.

    2017-01-01

    The current study explored the relation between the Big-Five personality domains, self-regulated learning, and academic entitlement. Academic entitlement is defined as the tendency to possess expectations of unearned academic success, unearned/undeserved academic services, and/or the expectation of unrealistic accommodation (Chowning and Campbell…

  19. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  20. SunShot 2030 for Photovoltaics (PV): Envisioning a Low-cost PV Future

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Wesley J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Frew, Bethany A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gagnon, Pieter J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Richards, James [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sun, Yinong [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Woodhouse, Michael A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-12

    In this report we summarize the implications, impacts, and deployment potential of reaching the SunShot 2030 targets for the electricity system in the contiguous United States. We model 25 scenarios of the U.S. power sector using the Regional Energy Deployment Systems (ReEDS) and Distributed Generation (dGen) capacity expansion models. The scenarios cover a wide range of sensitivities to capture future uncertainties relating to fuel prices, retirements, renewable energy capital costs, and load growth. We give special attention to the potential for storage costs to also rapidly decline due to its large synergies with low-cost solar. The ReEDS and dGen models project utility- and distributed-scale power sector evolution, respectively, for the United States. Both models have been designed with special emphasis on capturing the unique traits of renewable energy, including variability and grid integration requirements. Across the suite of scenarios modeled, we find that reaching the SunShot 2030 target has the potential to lead to significant capacity additions of PV in the United States. By 2050, PV penetration levels are projected to reach 28-46 percent of total generation. If storage also sees significant reductions in cost, then the 2050 solar penetration levels could reach 41-64 percent. PV deployment is projected to occur in all of the lower 48 states, though the specific deployment level is scenario dependent. The growth in PV is projected to be dominated by utility-scale systems, but the actual mix between utility and distributed systems could ultimately vary depending on how policies, system costs, and rate structures evolve.

  1. Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Phillip

    2014-11-01

    Air Products is carrying out a scope of work under DOE Award No. DE-FE0012065 “Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications.” The Statement of Project Objectives (SOPO) includes a Task 4f in which a Decision Point shall be reached, necessitating a review of Tasks 2-5 with an emphasis on Task 4f. This Topical Report constitutes the Decision Point Application pertaining to Task 4f. The SOPO under DOE Award No. DE-FE0012065 is aimed at furthering the development of the Ion Transport Membrane (ITM) Oxygen production process toward a demonstration scale facility known as the Oxygen Development Facility (ODF). It is anticipated that the completion of the current SOPO will advance the technology significantly along a pathway towards enabling the design and construction of the ODF. Development progress on several fronts is critical before an ODF project can commence; this Topical Report serves as an early update on the progress in critical development areas. Progress was made under all tasks, including Materials Development, Ceramic Processing Development, Engineering Development, and Performance Testing. Under Task 4f, Air Products carried out a cost and performance study in which several process design and cost parameters were varied and assessed with a process model and budgetary costing exercise. The results show that the major variables include ceramic module reliability, ITM operating temperature, module production yield, and heat addition strategy. High-temperature compact heat exchangers are shown to contribute significant cost benefits, while directly firing into the feed stream to an ITM are even a mild improvement on the high-temperature recuperation approach. Based on the findings to-date, Air Products recommends no changes to the content or emphasis in the current SOPO and recommends its completion prior to another formal assessment of these factors.

  2. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  3. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  4. Development of advanced manufacturing technologies for low cost hydrogen storage vessels

    Energy Technology Data Exchange (ETDEWEB)

    Leavitt, Mark [Quantum Fuel Systems Technologies Worldwide, Inc., Irvine, CA (United States); Lam, Patrick [Boeing Research and Technology (BR& T), Seattle, WA (United States)

    2014-12-29

    The U.S. Department of Energy (DOE) defined a need for low-cost gaseous hydrogen storage vessels at 700 bar to support cost goals aimed at 500,000 units per year. Existing filament winding processes produce a pressure vessel that is structurally inefficient, requiring more carbon fiber for manufacturing reasons, than would otherwise be necessary. Carbon fiber is the greatest cost driver in building a hydrogen pressure vessel. The objective of this project is to develop new methods for manufacturing Type IV pressure vessels for hydrogen storage with the purpose of lowering the overall product cost through an innovative hybrid process of optimizing composite usage by combining traditional filament winding (FW) and advanced fiber placement (AFP) techniques. A numbers of vessels were manufactured in this project. The latest vessel design passed all the critical tests on the hybrid design per European Commission (EC) 79-2009 standard except the extreme temperature cycle test. The tests passed include burst test, cycle test, accelerated stress rupture test and drop test. It was discovered the location where AFP and FW overlap for load transfer could be weakened during hydraulic cycling at 85°C. To design a vessel that passed these tests, the in-house modeling software was updated to add capability to start and stop fiber layers to simulate the AFP process. The original in-house software was developed for filament winding only. Alternative fiber was also investigated in this project, but the added mass impacted the vessel cost negatively due to the lower performance from the alternative fiber. Overall the project was a success to show the hybrid design is a viable solution to reduce fiber usage, thus driving down the cost of fuel storage vessels. Based on DOE’s baseline vessel size of 147.3L and 91kg, the 129L vessel (scaled to DOE baseline) in this project shows a 32% composite savings and 20% cost savings when comparing Vessel 15 hybrid design and the Quantum

  5. The Cost-Effectiveness of Low-Cost Essential Antihypertensive Medicines for Hypertension Control in China: A Modelling Study.

    Directory of Open Access Journals (Sweden)

    Dongfeng Gu

    2015-08-01

    Full Text Available Hypertension is China's leading cardiovascular disease risk factor. Improved hypertension control in China would result in result in enormous health gains in the world's largest population. A computer simulation model projected the cost-effectiveness of hypertension treatment in Chinese adults, assuming a range of essential medicines list drug costs.The Cardiovascular Disease Policy Model-China, a Markov-style computer simulation model, simulated hypertension screening, essential medicines program implementation, hypertension control program administration, drug treatment and monitoring costs, disease-related costs, and quality-adjusted life years (QALYs gained by preventing cardiovascular disease or lost because of drug side effects in untreated hypertensive adults aged 35-84 y over 2015-2025. Cost-effectiveness was assessed in cardiovascular disease patients (secondary prevention and for two blood pressure ranges in primary prevention (stage one, 140-159/90-99 mm Hg; stage two, ≥160/≥100 mm Hg. Treatment of isolated systolic hypertension and combined systolic and diastolic hypertension were modeled as a reduction in systolic blood pressure; treatment of isolated diastolic hypertension was modeled as a reduction in diastolic blood pressure. One-way and probabilistic sensitivity analyses explored ranges of antihypertensive drug effectiveness and costs, monitoring frequency, medication adherence, side effect severity, background hypertension prevalence, antihypertensive medication treatment, case fatality, incidence and prevalence, and cardiovascular disease treatment costs. Median antihypertensive costs from Shanghai and Yunnan province were entered into the model in order to estimate the effects of very low and high drug prices. Incremental cost-effectiveness ratios less than the per capita gross domestic product of China (11,900 international dollars [Int$] in 2015 were considered cost-effective. Treating hypertensive adults with prior

  6. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  7. Additively Manufactured Low Cost Upper Stage Combustion Chamber

    Science.gov (United States)

    Protz, Christopher; Cooper, Ken; Ellis, David; Fikes, John; Jones, Zachary; Kim, Tony; Medina, Cory; Taminger, Karen; Willingham, Derek

    2016-01-01

    Over the past two years NASA's Low Cost Upper Stage Propulsion (LCUSP) project has developed Additive Manufacturing (AM) technologies and design tools aimed at reducing the costs and manufacturing time of regeneratively cooled rocket engine components. High pressure/high temperature combustion chambers and nozzles must be regeneratively cooled to survive their operating environment, causing their design fabrication to be costly and time consuming due to the number of individual steps and different processes required. Under LCUSP, AM technologies in Sintered Laser Melting (SLM) GRCop-84 and Electron Beam Freeform Fabrication (EBF3) Inconel 625 have been significantly advanced, allowing the team to successfully fabricate a 25k-class regenerative chamber. Estimates of the costs and schedule of future builds indicate cost reductions and significant schedule reductions will be enabled by this technology. Characterization of the microstructural and mechanical properties of the SLM-produced GRCop-84, EBF3 Inconel 625 and the interface layer between the two has been performed and indicates the properties will meet the design requirements. The LCUSP chamber is to be tested with a previously demonstrated SLM injector in order to advance the Technology Readiness Level (TRL) and demonstrate the capability of the application of these processes. NASA is advancing these technologies to reduce cost and schedule for future engine applications and commercial needs.

  8. Identifying an Australian ‘Shadow’ Benefit / Cost Ratio for Public Projects

    OpenAIRE

    Lawrence, Craig

    2009-01-01

    This paper examines the social opportunity cost of a hypothetical public project in Australia and compares these values with the cost of the project as measured by factor prices. Since 2001, the Australian taxation system has included an ad valorem tax, the Goods and Services Tax, however relatively little analysis of the impact of this tax on public project evaluation methods has been undertaken. This tax creates divergences between social opportunity cost and conventional cost measures. The...

  9. Low-cost optical interconnect module for parallel optical data links

    Science.gov (United States)

    Noddings, Chad; Hirsch, Tom J.; Olla, M.; Spooner, C.; Yu, Jason J.

    1995-04-01

    We have designed, fabricated, and tested a prototype parallel ten-channel unidirectional optical data link. When scaled to production, we project that this technology will satisfy the following market penetration requirements: (1) up to 70 meters transmission distance, (2) at least 1 gigabyte/second data rate, and (3) 0.35 to 0.50 MByte/second volume selling price. These goals can be achieved by means of the assembly innovations described in this paper: a novel alignment method that is integrated with low-cost, few chip module packaging techniques, yielding high coupling and reducing the component count. Furthermore, high coupling efficiency increases projected reliability reducing the driver's power requirements.

  10. Low energy, low cost, efficient CO{sub 2} capture

    Energy Technology Data Exchange (ETDEWEB)

    Michael C. Trachtenberg; Lihong Bao; David A. Smith; Remy Dumortier [Carbozyme, Inc., Monmouth Junction, NJ (United States)

    2006-07-01

    This paper discusses the development and some characteristics of a new, enzyme-based, contained liquid membrane contactor to capture CO{sub 2}. The enzyme carbonic anhydrase catalyzes the removal of CO{sub 2} while the membrane contactor increases the surface area to allow the reduction of the size of the system. The modular system design is easily scaled to any required size reducing the investment costs. The system captures CO{sub 2} at a low energy and low cost promising to be a cost effective technology for CO{sub 2} capture. 5 refs., 7 figs.

  11. Helping To Integrate The Visually Challenged Into Mainstream Society Through A Low-Cost Braille Device

    Directory of Open Access Journals (Sweden)

    Desirée Jordan

    2013-06-01

    Full Text Available The visually challenged are often alienated from mainstream society because of their disabilities. This problem is even more pronounced in developing countries which often do not have the resources necessary to integrate this people group into their communities or even help them to become independent. It should therefore be the aim of governments in developing countries to provide this vulnerable people group with access to assistive technologies at a low cost. This paper describes an ongoing project that aims to provide low-cost assistive technologies to the visually challenged in Barbados. As a part of this project a study was conducted on a sample of visually challenged members of the Barbados Association for the Blind and Deaf to determine their ICT skills, knowledge of Braille and their use of assistive technologies. An analysis of the results prompted the design and creation of a low-cost Braille device prototype. The cost of this prototype was about one-half that of a commercially available device and can be used without a screen reader. This device should help create equal opportunities for the visually challenged in Barbados and other developing countries. It should also allow the visually challenged to become more independent.

  12. Cost-effectiveness of maternal GBS immunization in low-income sub-Saharan Africa.

    Science.gov (United States)

    Russell, Louise B; Kim, Sun-Young; Cosgriff, Ben; Pentakota, Sri Ram; Schrag, Stephanie J; Sobanjo-Ter Meulen, Ajoke; Verani, Jennifer R; Sinha, Anushua

    2017-12-14

    A maternal group B streptococcal (GBS) vaccine could prevent neonatal sepsis and meningitis. Its cost-effectiveness in low-income sub-Saharan Africa, a high burden region, is unknown. We used a decision tree model, with Markov nodes to project infants' lifetimes, to compare maternal immunization delivered through routine antenatal care with no immunization. 37 countries were clustered on the basis of economic and health resources and past public health performance. Vaccine efficacy for covered serotypes was ranged from 50% to 90%. The model projected EOGBS (early-onset) and LOGBS (late-onset) cases and deaths, disability-adjusted life years (DALYs), healthcare costs (2014 US$), and cost-effectiveness for a representative country in each of the four clusters: Guinea-Bissau, Uganda, Nigeria, and Ghana. Maximum vaccination costs/dose were estimated to meet two cost-effectiveness benchmarks, 0.5 GDP and GDP per capita/DALY, for ranges of disease incidence (reported and adjusted for under-reporting) and vaccine efficacy. At coverage equal to the proportion of pregnant women with≥4 antenatal visits (ANC4) and serotype-specific vaccine efficacy of 70%, maternal GBS immunization would prevent one-third of GBS cases and deaths in Uganda and Nigeria, where ANC4 is 50%, 42-43% in Guinea-Bissau (ANC4=65%), and 55-57% in Ghana (ANC4=87%). At a vaccination cost of $7/dose, maternal immunization would cost $320-$350/DALY averted in Guinea-Bissau, Nigeria, and Ghana, less than half these countries' GDP per capita. In Uganda, which has the lowest case fatality ratios, the cost would be $573/DALY. If the vaccine prevents a small proportion of stillbirths, it would be even more cost-effective. Vaccination cost/dose, disease incidence, and case fatality were key drivers of cost/DALY in sensitivity analyses. Maternal GBS immunization could be a cost-effective intervention in low-income sub-Saharan Africa, with cost-effectiveness ratios similar to other recently introduced vaccines

  13. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  14. 20 CFR 410.214 - Conditions of entitlement; parent, brother, or sister.

    Science.gov (United States)

    2010-04-01

    ... entitlement to brother's benefits may be established for any month before January 1973, based on a disability... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Conditions of entitlement; parent, brother...; Duration of Entitlement; Filing of Claims and Evidence § 410.214 Conditions of entitlement; parent, brother...

  15. Healthcare Cost and Utilization Project (HCUP)

    Science.gov (United States)

    The Healthcare Cost and Utilization Project is a family of health care databases and related software tools and products developed through a Federal-State-Industry partnership and sponsored by the Agency for Healthcare Research and Quality.

  16. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  17. Pi-Sat: A Low Cost Small Satellite and Distributed Spacecraft Mission System Test Platform

    Science.gov (United States)

    Cudmore, Alan

    2015-01-01

    Current technology and budget trends indicate a shift in satellite architectures from large, expensive single satellite missions, to small, low cost distributed spacecraft missions. At the center of this shift is the SmallSatCubesat architecture. The primary goal of the Pi-Sat project is to create a low cost, and easy to use Distributed Spacecraft Mission (DSM) test bed to facilitate the research and development of next-generation DSM technologies and concepts. This test bed also serves as a realistic software development platform for Small Satellite and Cubesat architectures. The Pi-Sat is based on the popular $35 Raspberry Pi single board computer featuring a 700Mhz ARM processor, 512MB of RAM, a flash memory card, and a wealth of IO options. The Raspberry Pi runs the Linux operating system and can easily run Code 582s Core Flight System flight software architecture. The low cost and high availability of the Raspberry Pi make it an ideal platform for a Distributed Spacecraft Mission and Cubesat software development. The Pi-Sat models currently include a Pi-Sat 1U Cube, a Pi-Sat Wireless Node, and a Pi-Sat Cubesat processor card.The Pi-Sat project takes advantage of many popular trends in the Maker community including low cost electronics, 3d printing, and rapid prototyping in order to provide a realistic platform for flight software testing, training, and technology development. The Pi-Sat has also provided fantastic hands on training opportunities for NASA summer interns and Pathways students.

  18. Original article Entitlement and subjective well-being: a three-nations study

    Directory of Open Access Journals (Sweden)

    Magdalena Żemojtel-Piotrowska

    2015-03-01

    Full Text Available Background The current study investigated the role of three facets of entitlement (active, passive and revenge in various forms of subjective well-being (SWB: hedonistic and two facets of eudaimonic well-being (social and psychological. Social well-being was based on Keyes’ model (1998 and psychological well-being on Ryff’s model (1989. Participants and procedure The study was performed in three nations (Poland, Puerto Rico and Vietnam on student samples (Poland, n = 245, Vietnam, n = 115, and Puerto Rico, n = 300. To assess entitlement level the Entitlement Questionnaire was used. The level of hedonistic well-being was measured with the Satisfaction with Life Scale (SWLS and the Positive and Negative Affect Schedule (PANAS, and eudaimonic well-being by the Mental Health Continuum–Short Form (MHC-SF. Results Active entitlement was positively related to all aspects of SWB. Revenge entitlement was negatively related to hedonistic and psychological SWB in all samples and negatively related to social well-being only in Poland. Passive entitlement was unrelated to SWB. Conclusions The current study shows cross-cultural similarities in relationships of entitlement with hedonistic and psychological well-being and cross-cultural differences in the relationship of entitlement with social well-being. Additionally, the study indicates positive meaning of healthy aspects of entitlement for subjective well-being and negative meaning of dysfunctional aspects of entitlement for subjective well-being.

  19. Low-cost carriers fare competition effect

    NARCIS (Netherlands)

    Carmona Benitez, R.B.; Lodewijks, G.

    2010-01-01

    This paper examines the effects that low-cost carriers (LCC’s) produce when entering new routes operated only by full-service carriers (FSC’s) and routes operated by low-cost carriers in competition with full-service carriers. A mathematical model has been developed to determine what routes should

  20. Informing resource-poor populations and the delivery of entitled health and social services in rural India: a cluster randomized controlled trial.

    Science.gov (United States)

    Pandey, Priyanka; Sehgal, Ashwini R; Riboud, Michelle; Levine, David; Goyal, Madhav

    2007-10-24

    A lack of awareness about entitled health and social services may contribute to poor delivery of such services in developing countries, especially among individuals of low socioeconomic status. To determine the impact of informing resource-poor rural populations about entitled services. Community-based, cluster randomized controlled trial conducted from May 2004 to May 2005 in 105 randomly selected village clusters in Uttar Pradesh state in India. Households (548 intervention and 497 control) were selected by a systematic sampling design, including both low-caste and mid- to high-caste households. Four to 6 public meetings were held in each intervention village cluster to disseminate information on entitled health services, entitled education services, and village governance requirements. No intervention took place in control village clusters. Visits by nurse midwife; prenatal examinations, tetanus vaccinations, and prenatal supplements received by pregnant women; vaccinations received by infants; excess school fees charged; occurrence of village council meetings; and development work in villages. At baseline, there were no significant differences in self-reported delivery of health and social services. After 1 year, intervention villagers reported better delivery of several services compared with control villagers: in a multivariate analysis, 30% more prenatal examinations (95% confidence interval [CI], 17%-43%; P India about entitled services enhanced the delivery of health and social services among both low- and mid- to high-caste households. Interventions that emphasize educating resource-poor populations about entitled services may improve the delivery of such services. clinicaltrials.gov Identifier: NCT00421291.

  1. Low-Cost Spectral Sensor Development Description.

    Energy Technology Data Exchange (ETDEWEB)

    Armijo, Kenneth Miguel; Yellowhair, Julius

    2014-11-01

    Solar spectral data for all parts of the US is limited due in part to the high cost of commercial spectrometers. Solar spectral information is necessary for accurate photovoltaic (PV) performance forecasting, especially for large utility-scale PV installations. A low-cost solar spectral sensor would address the obstacles and needs. In this report, a novel low-cost, discrete- band sensor device, comprised of five narrow-band sensors, is described. The hardware is comprised of commercial-off-the-shelf components to keep the cost low. Data processing algorithms were developed and are being refined for robustness. PV module short-circuit current ( I sc ) prediction methods were developed based on interaction-terms regression methodology and spectrum reconstruction methodology for computing I sc . The results suggest the computed spectrum using the reconstruction method agreed well with the measured spectrum from the wide-band spectrometer (RMS error of 38.2 W/m 2 -nm). Further analysis of computed I sc found a close correspondence of 0.05 A RMS error. The goal is for ubiquitous adoption of the low-cost spectral sensor in solar PV and other applications such as weather forecasting.

  2. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  3. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  4. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  5. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  6. Using Low Cost Environmental Sensors in Geoscience Education

    Science.gov (United States)

    Leeman, J.; Ammon, C. J.; Anandakrishnan, S.

    2014-12-01

    Advances in process technology have drastically reduced the cost of manufacturing almost every type of sensor and micro-controller, putting low-to-mid grade sensor technology in the reach of educators and hobbyists. We demonstrate how a low cost magnetometer and an Arduino micro-controller can be used in education. Students can easily connect the sensor to the Arduino and collect three-component magnetic field data. Experiments can easily be turned into long-term monitoring projects by connecting sensors to the internet and providing an Internet-of-Things interface to store and to display the data in near-real time. Low-cost sensors are generally much noisier than their research grade counterparts, but can still provide an opportunity for students to learn about fundamental concepts such as signal quality, sampling, averaging, and filtering and to gain hands-on, concrete experience with observations. Sensors can be placed at different locations and compared both qualitatively and quantitatively. For example, with an inexpensive magnetometer, students can examine diurnal magnetic field variations and look for magnetic storms. Magnetic field orientation can be calculated and compared to the predicted geomagnetic field orientation at a given location. Data can be stored in simple text files to facilitate analysis with any convenient package. We illustrate the idea using Python notebooks, allowing students to explore the data interactively and to learn the basic principles of programming and reproducible research. Using an Arduino encourages students to interact with open-source data collection hardware and to experiment with ways to quickly, cheaply, and effectively measure the environment. Analysis of these data can lead to a deeper understanding of both geoscience and data processing.

  7. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  8. Evaluation of a low-cost open-source gaze tracker

    DEFF Research Database (Denmark)

    San Agustin, Javier; Jensen, Henrik Tomra Skovsgaard Hegner; Møllenbach, Emilie

    2010-01-01

    This paper presents a low-cost gaze tracking system that is based on a webcam mounted close to the user's eye. The performance of the gaze tracker was evaluated in an eye-typing task using two different typing applications. Participants could type between 3.56 and 6.78 words per minute, depending...... on the typing system used. A pilot study to assess the usability of the system was also carried out in the home of a user with severe motor impairments. The user successfully typed on a wall-projected interface using his eye movements....

  9. Towards the next generation 23% efficient n-type cells with low cost manufacturing

    Energy Technology Data Exchange (ETDEWEB)

    Yelundur, Vijay [Suniva Inc., Norcross, GA (United States)

    2017-04-19

    Suniva, Inc., in collaboration with the University Center for Excellence in Photovoltaics (UCEP) at the Georgia Institute of Technology (GIT) proposed this comprehensive three year program to enable the development of an advanced high performance product that will help the US regain its competitive edge in PV. This project was designed to overcome cost and efficiency barriers through advances in PV science, technology innovation, low-cost manufacturing and full production of ~22.5% efficient n-type Si cells in Norcross, GA. At the heart of the project is the desire to complement the technology being developed concurrently under the Solarmat and ARPAe initiatives to develop a differentiated product superior in both performance and cost effectiveness to the competing alternatives available on the market, and push towards achieving SunShot objectives while ensuring a sustainable business model based on US manufacturing. A significant reduction of the costs in modules produced today will need to combine reductions in wafer costs, cell processing costs as well as module fabrication costs while delivering a product that is not only more efficient under test conditions but also increases the energy yield in outdoor operations. This project will result in a differentiated high performance product and technology that is consistent with sustaining PV manufacturing in the US for a longer term and further highlights the need for continued support for developing the next generation concepts that can keep US manufacturing thriving to support the growing demand for PV in the US and consistent with the US government’s mandates for energy independence.

  10. A PRECISE, LOW-COST RTK GNSS SYSTEM FOR UAV APPLICATIONS

    Directory of Open Access Journals (Sweden)

    W. Stempfhuber

    2012-09-01

    Full Text Available High accuracy with real-time positioning of moving objects has been considered a standard task of engineering geodesy for 10 to 15 years. An absolute positioning accuracy of 1–3 cm is generally possible worldwide and is further used in many areas of machine guidance (machine control and guidance, and farming (precision farming as well as for various special applications (e.g. railway trolley, mining, etc.. The cost of the measuring instruments required for the use of geodetic L1/L2 receivers with a local reference station amounts to approximately USD 30,000 to 50,000. Therefore, dual frequency RTK GNSS receivers are not used in the mass market. Affordable GPS/GNSS modules have already reached the mass market in various areas such as mobile phones, car navigation, the leisure industry, etc. Kinematic real-time positioning applications with centimetre or decimetre levels could also evolve into a mass product. In order for this to happen, the costs for such systems must lie between USD 1,000 to 2,000. What exactly low-cost means is determined by the precise specifications of the given individual application. Several university studies in geodesy focus on the approach of high-accuracy positioning by means of single frequency receivers for static applications [e.g. GLABSCH et. al. 2009, SCHWIEGER and GLÄSER 2005, ALKAN 2010, REALINI et. al. 2010, KORTH and HOFMANN 2011]. Although intelligent approaches have been developed that compute a trajectory in the post-processing mode [REALINI et. al., 2010], at present, there are only a very few GNSS Low-Cost Systems that enable real-time processing. This approach to precise position determination by means of the computation of static raw data with single frequency receivers is currently being explored in a research project at the Beuth Hochschule für Technik Berlin – and is being further developed for kinematic applications. The project is embedded in the European Social Fund. It is a follow-up project

  11. Approach to Low-Cost High-Efficiency OLED Lighting. Building Technologies Solid State Lighting (SSL) Program Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Pei, Qibing [Univ. of California, Los Angeles, CA (United States). Dept. of Materials Science and Engineering

    2017-10-06

    This project developed an integrated substrate which organic light emitting diode (OLED) panel developers could employ the integrated substrate to fabricate OLED devices with performance and projected cost meeting the MYPP targets of the Solid State Lighting Program of the Department of Energy. The project optimized the composition and processing conditions of the integrated substrate for OLED light extraction efficiency and overall performance. The process was further developed for scale up to a low-cost process and fabrication of prototype samples. The encapsulation of flexible OLEDs based on this integrated substrate was also investigated using commercial flexible barrier films.

  12. Feasibility of a low-cost sounding rockoon platform

    Science.gov (United States)

    Okninski, Adam; Raurell, Daniel Sors; Mitre, Alberto Rodriguez

    2016-10-01

    This paper presents the results of analyses and simulations for the design of a small sounding platform, dedicated to conducting scientific atmospheric research and capable of reaching the von Kármán line by means of a rocket launched from it. While recent private initiatives have opted for the air launch concept to send small payloads to Low Earth Orbit, several historical projects considered the use of balloons as the first stage of orbital and suborbital platforms, known as rockoons. Both of these approaches enable the minimization of drag losses. This paper addresses the issue of utilizing stratospheric balloons as launch platforms to conduct sub-orbital rocket flights. Research and simulations have been conducted to demonstrate these capabilities and feasibility. A small sounding solid propulsion rocket using commercially-off-the-shelf hardware is proposed. Its configuration and design are analyzed with special attention given to the propulsion system and its possible mission-orientated optimization. The cost effectiveness of this approach is discussed. Performance calculation outcomes are shown. Additionally, sensitivity study results for different design parameters are given. Minimum mass rocket configurations for various payload requirements are presented. The ultimate aim is to enhance low-cost experimentation maintaining high mobility of the system and simplicity of operations. An easier and more affordable access to a space-like environment can be achieved with this system, thus allowing for widespread outreach of space science and technology knowledge. This project is based on earlier experience of the authors in LEEM Association of the Technical University of Madrid and the Polish Small Sounding Rocket Program developed at the Institute of Aviation and Warsaw University of Technology in Poland.

  13. Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations

    Directory of Open Access Journals (Sweden)

    Hans Lind

    2014-09-01

    Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project.   Keywords: Cost overruns, Infrastructure projects, Policy measures

  14. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    Science.gov (United States)

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  15. Strategies to fight low-cost rivals.

    Science.gov (United States)

    Kumar, Nirmalya

    2006-12-01

    Companies find it challenging and yet strangely reassuring to take on opponents whose strategies, strengths, and weaknesses resemble their own. Their obsession with familiar rivals, however, has blinded them to threats from disruptive, low-cost competitors. Successful price warriors, such as the German retailer Aldi, are changing the nature of competition by employing several tactics: focusing on just one or a few consumer segments, delivering the basic product or providing one benefit better than rivals do, and backing low prices with superefficient operations. Ignoring cutprice rivals is a mistake because they eventually force companies to vacate entire market segments. Price wars are not the answer, either: Slashing prices usually lowers profits for incumbents without driving the low-cost entrants out of business. Companies take various approaches to competing against cut-price players. Some differentiate their products--a strategy that works only in certain circumstances. Others launch low-cost businesses of their own, as many airlines did in the 1990s--a so-called dual strategy that succeeds only if companies can generate synergies between the existing businesses and the new ventures, as the financial service providers HSBC and ING did. Without synergies, corporations are better off trying to transform themselves into low-cost players, a difficult feat that Ryanair accomplished in the 1990s, or into solution providers. There will always be room for both low-cost and value-added players. How much room each will have depends not only on the industry and customers' preferences, but also on the strategies traditional businesses deploy.

  16. Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-04-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  17. Remote-Handled Low Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2010-10-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  18. Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-03-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  19. Remote-Handled Low-Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2010-06-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  20. Research and development of a low cost expandable grid-linked inverter system: PG2000

    Energy Technology Data Exchange (ETDEWEB)

    Lakin, R.A.

    2000-07-01

    The overall aim of the project was to research and develop an inverter for use in the conversion of solar energy into mains electricity, which is low-cost in volume manufacture and flexible in terms of expendability to meet different power level needs. (author)

  1. low-cost apparatus from locally available materials for teaching

    African Journals Online (AJOL)

    unesco

    twofold: i) to design and produce appropriate low cost apparatus from locally .... How are the low-cost and manufactured apparatus compared in terms of cost and efficiency? ... BASIC TOOLS FOR THE LOW COST APPARATUS PRODUCTION.

  2. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    of Engineering, the Built. Environment, and .... works; identification of causes of cost overruns, as well as the control measures for .... project; poor project schedules and management; increases in the prices of .... conclusion, the magnitude of the cost overrun was reduced after ..... Research in Business, 3(11), pp. 775-780.

  3. 40 CFR 35.925-18 - Limitation upon project costs incurred prior to award.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Limitation upon project costs incurred...-Clean Water Act § 35.925-18 Limitation upon project costs incurred prior to award. That project... project costs in the following cases: (1) Step 1 work begun after the date of approval by the Regional...

  4. Academic Entitlement in the Context of Learning Styles

    Science.gov (United States)

    Andrey, Jean; Joakim, Erin; Schoner, Vivian; Hambly, Derrick; Silver, Amber; Jayasundera, Rohan; Nelson, Allen

    2012-01-01

    This study explores the linkages between students' sense of entitlement and their approaches to learning, based on survey research at a large public university in Canada. Through literature review and pilot testing, a questionnaire instrument was developed that measures four constructs: academic entitlement, deep learning, surface learning and…

  5. Overview of low level waste disposal facility costs

    International Nuclear Information System (INIS)

    Saverot, P.M.

    1995-01-01

    Economics and uncertainty go hand-in-hand and it is too soon to have conclusive data on the life cycle costs of a disposal facility. While LLW volumes from are decreasing year after year, the effect of the projected LLW volumes from decommissioning may have a significant impact on the final unit costs. This overview recognizes that countries see LLW disposal costs differently depending on the scale of their programs and on the geographical, political and economic frameworks within which they operate. The reasons for the cost differences arise from a number of factors: differences in designs and in technologies (near surface engineered vault, enhanced shallow land burial, silo type caverns,...), disposal capacities, programmatic and regulatory requirements, organizational, managerial and institutional frameworks, contractual arrangements, etc. Comparison of actual project costs, if done incorrectly, can lead to invalid conclusions and little purpose would be served by so doing since cost variations reflect the reality faced by each country

  6. A Low Cost Mechatronics Device for STEM Education

    Science.gov (United States)

    Himes, Larry Eugene, Jr.

    All of the low-cost STEM education devices currently available are limited in function which limits learning. The motivation was to design and develop a device that will intrigue post-secondary students to learn STEM education concepts in a hands-on manner. The device needed to be open source so as to lower the cost to make it available to more students. And, making it feature rich was important for use with multiple projects the students may encounter or build themselves as they grow. The device has provided visual and physical feedback to students making the device more intriguing to use. Using the open-source C compiler reduced cost for students to use the device and taught them how to use an industry standard programming language. Students enjoyed the WAV file rendering for sound effects and LED lighting effects from the device. Most interviewees were intrigued by the device for use in their training facilities and classrooms. There are a couple of multi-axis controllers available but none with position feedback. Ethernet or Bluetooth interfacing was mentioned as a future feature and it was encouraged by nearly all who were interviewed.

  7. Cultural Heritage Recording Utilising Low-Cost Closerange Photogrammetry

    Directory of Open Access Journals (Sweden)

    Melanie Kirchhöfer

    2011-12-01

    Full Text Available Cultural heritage is under a constant threat of damage or even destruction and comprehensive and accurate recording is necessary to attenuate the risk of losing heritage or serve as basis for reconstruction. Cost effective and easy to use methods are required to record cultural heritage, particularly during a world recession, and close-range photogrammetry has proven potential in this area. Off-the-shelf digital cameras can be used to rapidly acquire data at low cost, allowing non-experts to become involved. Exterior orientation of the camera during exposure ideally needs to be established for every image, traditionally requiring known coordinated target points. Establishing these points is time consuming and costly and using targets can be often undesirable on sensitive sites. MEMS-based sensors can assist in overcoming this problem by providing small-size and low-cost means to directly determine exterior orientation for close-range photogrammetry. This paper describes development of an image-based recording system, comprising an off-the-shelf digital SLR camera, a MEMS-based 3D orientation sensor and a GPS antenna. All system components were assembled in a compact and rigid frame that allows calibration of rotational and positional offsets between the components. The project involves collaboration between English Heritage and Loughborough University and the intention is to assess the system’s achievable accuracy and practicability in a heritage recording environment. Tests were conducted at Loughborough University and a case study at St. Catherine’s Oratory on the Isle of Wight, UK. These demonstrate that the data recorded by the system can indeed meet the accuracy requirements for heritage recording at medium accuracy (1-4cm, with either a single or even no control points. As the recording system has been configured with a focus on low-cost and easy-to-use components, it is believed to be suitable for heritage recording by non

  8. Algolcam: Low Cost Sky Scanning with Modern Technology

    Science.gov (United States)

    Connors, Martin; Bolton, Dempsey; Doktor, Ian

    2016-01-01

    Low cost DSLR cameras running under computer control offer good sensitivity, high resolution, small size, and the convenience of digital image handling. Recent developments in small single board computers have pushed the performance to cost and size ratio to unprecedented values, with the further advantage of very low power consumption. Yet a third technological development is motor control electronics which is easily integrated with the computer to make an automated mount, which in our case is custom built, but with similar mounts available commercially. Testing of such a system under a clear plastic dome at our auroral observatory was so successful that we have developed a weatherproof housing allowing use during the long, cold, and clear winter nights at northerly latitudes in Canada. The main advantage of this housing should be improved image quality as compared to operation through clear plastic. We have improved the driving software to include the ability to self-calibrate pointing through the web API of astrometry.net, and data can be reduced automatically through command line use of the Muniwin program. The mount offers slew in declination and RA, and tracking at sidereal or other rates in RA. Our previous tests with a Nikon D5100 with standard lenses in the focal length range 50-200 mm, operating at f/4 to f/5, allowed detection of 12th magnitude stars with 30 second exposure under very dark skies. At 85 mm focal length, a field of 15° by 10° is imaged with 4928 by 3264 color pixels, and we have adopted an 85 mm fixed focal length f/1.4 lens (as used by Project Panoptes), which we expect will give a limited magnitude approaching 15. With a large field of view, deep limiting magnitude, low cost, and ease of construction and use, we feel that the Algolcam offers great possibilities in monitoring and finding changes in the sky. We have already applied it to variable star light curves, and with a suitable pipeline for detection of moving or varying objects

  9. 42 CFR 31.2 - Persons entitled to treatment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Persons entitled to treatment. 31.2 Section 31.2... Public Health Service § 31.2 Persons entitled to treatment. To the extent and under the circumstances... treatment and hospitalization by the Service: (a) Coast Guard. (1) Commissioned officers, chief warrant...

  10. Low Cost Benefit Suggestions.

    Science.gov (United States)

    Doyel, Hoyt W.; McMillan, John D.

    1980-01-01

    Outlines eight low-cost employee benefits and summarizes their relative advantages. The eight include a stock ownership program, a sick leave pool, flexible working hours, production incentives, and group purchase plans. (IRT)

  11. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  12. Dynamic Cost-Contingency Management: A Method for Reducing Project Costs While Increasing the Probability of Success

    National Research Council Canada - National Science Library

    Kujawski, Edouard

    2007-01-01

    In the real world, "Money Allocated is Money Spent" (MAIMS). As a consequence, cost underruns are rarely available to protect against cost overruns, while task overruns are passed on to the total project cost...

  13. Flexible resource management and its effect on project cost and duration

    Science.gov (United States)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  14. Low Cost, Low Power, High Sensitivity Magnetometer

    Science.gov (United States)

    2008-12-01

    which are used to measure the small magnetic signals from brain. Other types of vector magnetometers are fluxgate , coil based, and magnetoresistance...concentrator with the magnetometer currently used in Army multimodal sensor systems, the Brown fluxgate . One sees the MEMS fluxgate magnetometer is...Guedes, A.; et al., 2008: Hybrid - LOW COST, LOW POWER, HIGH SENSITIVITY MAGNETOMETER A.S. Edelstein*, James E. Burnette, Greg A. Fischer, M.G

  15. The use of low cost compact cameras with focus stacking functionality in entomological digitization projects

    Directory of Open Access Journals (Sweden)

    Jan Mertens

    2017-10-01

    Full Text Available Digitization of specimen collections has become a key priority of many natural history museums. The camera systems built for this purpose are expensive, providing a barrier in institutes with limited funding, and therefore hampering progress. An assessment is made on whether a low cost compact camera with image stacking functionality can help expedite the digitization process in large museums or provide smaller institutes and amateur entomologists with the means to digitize their collections. Images of a professional setup were compared with the Olympus Stylus TG-4 Tough, a low-cost compact camera with internal focus stacking functions. Parameters considered include image quality, digitization speed, price, and ease-of-use. The compact camera’s image quality, although inferior to the professional setup, is exceptional considering its fourfold lower price point. Producing the image slices in the compact camera is a matter of seconds and when optimal image quality is less of a priority, the internal stacking function omits the need for dedicated stacking software altogether, further decreasing the cost and speeding up the process. In general, it is found that, aware of its limitations, this compact camera is capable of digitizing entomological collections with sufficient quality. As technology advances, more institutes and amateur entomologists will be able to easily and affordably catalogue their specimens.

  16. Low-Cost Multi-Junction Photovoltaic Cells, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed SBIR project will provide a pathway to dramatically reduce the cost of multi-junction solar cells. The project leverages a TRL6 micropackaging process...

  17. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  18. Simulation Based Low-Cost Composite Process Development at the US Air Force Research Laboratory

    Science.gov (United States)

    Rice, Brian P.; Lee, C. William; Curliss, David B.

    2003-01-01

    Low-cost composite research in the US Air Force Research Laboratory, Materials and Manufacturing Directorate, Organic Matrix Composites Branch has focused on the theme of affordable performance. Practically, this means that we use a very broad view when considering the affordability of composites. Factors such as material costs, labor costs, recurring and nonrecurring manufacturing costs are balanced against performance to arrive at the relative affordability vs. performance measure of merit. The research efforts discussed here are two projects focused on affordable processing of composites. The first topic is the use of a neural network scheme to model cure reaction kinetics, then utilize the kinetics coupled with simple heat transport models to predict, in real-time, future exotherms and control them. The neural network scheme is demonstrated to be very robust and a much more efficient method that mechanistic cure modeling approach. This enables very practical low-cost processing of thick composite parts. The second project is liquid composite molding (LCM) process simulation. LCM processing of large 3D integrated composite parts has been demonstrated to be a very cost effective way to produce large integrated aerospace components specific examples of LCM processes are resin transfer molding (RTM), vacuum assisted resin transfer molding (VARTM), and other similar approaches. LCM process simulation is a critical part of developing an LCM process approach. Flow simulation enables the development of the most robust approach to introducing resin into complex preforms. Furthermore, LCM simulation can be used in conjunction with flow front sensors to control the LCM process in real-time to account for preform or resin variability.

  19. Multiobjective optimization applied to structural sizing of low cost university-class microsatellite projects

    Science.gov (United States)

    Ravanbakhsh, Ali; Franchini, Sebastián

    2012-10-01

    In recent years, there has been continuing interest in the participation of university research groups in space technology studies by means of their own microsatellites. The involvement in such projects has some inherent challenges, such as limited budget and facilities. Also, due to the fact that the main objective of these projects is for educational purposes, usually there are uncertainties regarding their in orbit mission and scientific payloads at the early phases of the project. On the other hand, there are predetermined limitations for their mass and volume budgets owing to the fact that most of them are launched as an auxiliary payload in which the launch cost is reduced considerably. The satellite structure subsystem is the one which is most affected by the launcher constraints. This can affect different aspects, including dimensions, strength and frequency requirements. In this paper, the main focus is on developing a structural design sizing tool containing not only the primary structures properties as variables but also the system level variables such as payload mass budget and satellite total mass and dimensions. This approach enables the design team to obtain better insight into the design in an extended design envelope. The structural design sizing tool is based on analytical structural design formulas and appropriate assumptions including both static and dynamic models of the satellite. Finally, a Genetic Algorithm (GA) multiobjective optimization is applied to the design space. The result is a Pareto-optimal based on two objectives, minimum satellite total mass and maximum payload mass budget, which gives a useful insight to the design team at the early phases of the design.

  20. Costs of vaccine programs across 94 low- and middle-income countries.

    Science.gov (United States)

    Portnoy, Allison; Ozawa, Sachiko; Grewal, Simrun; Norman, Bryan A; Rajgopal, Jayant; Gorham, Katrin M; Haidari, Leila A; Brown, Shawn T; Lee, Bruce Y

    2015-05-07

    While new mechanisms such as advance market commitments and co-financing policies of the GAVI Alliance are allowing low- and middle-income countries to gain access to vaccines faster than ever, understanding the full scope of vaccine program costs is essential to ensure adequate resource mobilization. This costing analysis examines the vaccine costs, supply chain costs, and service delivery costs of immunization programs for routine immunization and for supplemental immunization activities (SIAs) for vaccines related to 18 antigens in 94 countries across the decade, 2011-2020. Vaccine costs were calculated using GAVI price forecasts for GAVI-eligible countries, and assumptions from the PAHO Revolving Fund and UNICEF for middle-income countries not supported by the GAVI Alliance. Vaccine introductions and coverage levels were projected primarily based on GAVI's Adjusted Demand Forecast. Supply chain costs including costs of transportation, storage, and labor were estimated by developing a mechanistic model using data generated by the HERMES discrete event simulation models. Service delivery costs were abstracted from comprehensive multi-year plans for the majority of GAVI-eligible countries and regression analysis was conducted to extrapolate costs to additional countries. The analysis shows that the delivery of the full vaccination program across 94 countries would cost a total of $62 billion (95% uncertainty range: $43-$87 billion) over the decade, including $51 billion ($34-$73 billion) for routine immunization and $11 billion ($7-$17 billion) for SIAs. More than half of these costs stem from service delivery at $34 billion ($21-$51 billion)-with an additional $24 billion ($13-$41 billion) in vaccine costs and $4 billion ($3-$5 billion) in supply chain costs. The findings present the global costs to attain the goals envisioned during the Decade of Vaccines to prevent millions of deaths by 2020 through more equitable access to existing vaccines for people in all

  1. Road to Grid Parity through Deployment of Low-Cost 21.5% N-Type Si Solar Cells

    Energy Technology Data Exchange (ETDEWEB)

    Velundur, Vijay [Suniva, Norcross, GA (United States)

    2017-04-19

    This project seeks to develop and deploy differentiated 21.5% efficient n-type Si solar cells while reaching the SunShot module cost goal of ≤ $0.50/W. This objective hinges on development of enabling low cost technologies that simplify the manufacturing process and reduce overall processing costs. These comprise of (1) Boron emitter formation and passivation; (2) Simplified processing process for emitter and BSF layers; and (3) Advanced metallization for the front and back contacts.

  2. Academic Entitlement: Relations to Perceptions of Parental Warmth and Psychological Control

    Science.gov (United States)

    Turner, Lisa A.; McCormick, Wesley H.

    2018-01-01

    Academic entitlement characterises students who expect positive academic outcomes without personal effort. The current study examined the relations of perceived parental warmth and parental psychological control with two dimensions of academic entitlement (i.e., entitled expectations and externalised responsibility) among college students.…

  3. Commercial/industrial photovoltaic module and array requirement study. Low-cost solar array project engineering area

    Science.gov (United States)

    1981-01-01

    Design requirements for photovoltaic modules and arrays used in commercial and industrial applications were identified. Building codes and referenced standards were reviewed for their applicability to commercial and industrial photovoltaic array installation. Four general installation types were identified - integral (replaces roofing), direct (mounted on top of roofing), stand-off (mounted away from roofing), and rack (for flat or low slope roofs, or ground mounted). Each of the generic mounting types can be used in vertical wall mounting systems. This implies eight mounting types exist in the commercial/industrial sector. Installation costs were developed for these mounting types as a function of panel/module size. Cost drivers were identified. Studies were performed to identify optimum module shapes and sizes and operating voltage cost drivers. The general conclusion is that there are no perceived major obstacles to the use of photovoltaic modules in commercial/industrial arrays.

  4. Selecting and Ranking Cost Research Projects

    Science.gov (United States)

    1993-09-01

    Model (STACM) Enhancements Automated Cost Estimating Integrated Tools ( ACEIT ) Libraries BM/C 3 GEP Engineering and Cost BM/C 3 EP Engineering and Cost...50K NOM VHI 0.02635481 STACM ENHANCEMENTS NOM អK NOM VHI 0.02468682 ACEIT LIBRARIES VHI 50-IOOK HI VHI 0.06357704 GEP ENGRG. & COST VHI 100-150K VHl...0.02505922 SCATS LOW អK NOM VIII 0.02468682 PICES SUPPORT NOM 50-100K NOM VlIl 0.02455186 ACEIT SUPPORT VIII 50-100K VHI VHI 0.08208244 GUARDIAN

  5. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  6. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  7. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  8. Low-cost satellite mechanical design and construction

    Science.gov (United States)

    Boisjolie-Gair, Nathaniel; Straub, Jeremy

    2017-05-01

    This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.

  9. Projected Lifetime Healthcare Costs Associated with HIV Infection

    DEFF Research Database (Denmark)

    Nakagawa, Fumiyo; Miners, Alec; Smith, Colette J

    2015-01-01

    computer simulation model to project the distribution of lifetime outcomes and costs of men-who-have-sex-with-men (MSM) infected with HIV in 2013 aged 30, over 10,000 simulations. We assumed a resource-rich setting with no loss to follow-up, and that standards and costs of healthcare management remain...

  10. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  11. Simple Automatic File Exchange (SAFE) to Support Low-Cost Spacecraft Operation via the Internet

    Science.gov (United States)

    Baker, Paul; Repaci, Max; Sames, David

    1998-01-01

    Various issues associated with Simple Automatic File Exchange (SAFE) are presented in viewgraph form. Specific topics include: 1) Packet telemetry, Internet IP networks and cost reduction; 2) Basic functions and technical features of SAFE; 3) Project goals, including low-cost satellite transmission to data centers to be distributed via an Internet; 4) Operations with a replicated file protocol; 5) File exchange operation; 6) Ground stations as gateways; 7) Lessons learned from demonstrations and tests with SAFE; and 8) Feedback and future initiatives.

  12. a Framework for Low-Cost Multi-Platform VR and AR Site Experiences

    Science.gov (United States)

    Wallgrün, J. O.; Huang, J.; Zhao, J.; Masrur, A.; Oprean, D.; Klippel, A.

    2017-11-01

    Low-cost consumer-level immersive solutions have the potential to revolutionize education and research in many fields by providing virtual experiences of sites that are either inaccessible, too dangerous, or too expensive to visit, or by augmenting in-situ experiences using augmented and mixed reality methods. We present our approach for creating low-cost multi-platform virtual and augmented reality site experiences of real world places for education and research purposes, making extensive use of Structure-from-Motion methods as well as 360° photography and videography. We discuss several example projects, for the Mayan City of Cahal Pech, Iceland's Thrihnukar volcano, the Santa Marta informal settlement in Rio, and for the Penn State Campus, and we propose a framework for creating and maintaining such applications by combining declarative content specification methods with a central linked-data based spatio-temporal information system.

  13. Low-Cost alpha Alane for Hydrogen Storage

    Energy Technology Data Exchange (ETDEWEB)

    Fabian, Tibor [Ardica Technologies, San Francisco, CA (United States); Petrie, Mark [SRI International, Menlo Park, CA (United States); Crouch-Baker, Steven [SRI International, Menlo Park, CA (United States); Fong, Henry [SRI International, Menlo Park, CA (United States)

    2017-10-10

    This project was directed towards the further development of the Savannah River National Laboratory (SRNL) lab-scale electrochemical synthesis of the hydrogen storage material alpha-alane and Ardica Technologies-SRI International (SRI) chemical downstream processes that are necessary to meet DoE cost metrics and transition alpha-alane synthesis to an industrial scale. Ardica has demonstrated the use of alpha-alane in a fuel-cell system for the U.S. Army WFC20 20W soldier power system that has successfully passed initial field trials with individual soldiers. While alpha-alane has been clearly identified as a desirable hydrogen storage material, cost-effective means for its production and regeneration on a scale of use applicable to the industry have yet to be established. We focused on three, principal development areas: 1. The construction of a comprehensive engineering techno-economic model to establish the production costs of alpha-alane by both electrochemical and chemical routes at scale. 2. The identification of critical, cost-saving design elements of the electrochemical cell and the quantification of the product yields of the primary electrochemical process. A moving particle-bed reactor design was constructed and operated. 3. The experimental quantification of the product yields of candidate downstream chemical processes necessary to produce alpha-alane to complete the most cost-effective overall manufacturing process. Our techno-economic model shows that under key assumptions most 2015 and 2020 DOE hydrogen storage system cost targets for low and medium power can be achieved using the electrochemical alane synthesis process. To meet the most aggressive 2020 storage system cost target, $1/g, our model indicates that 420 metric tons per year (MT/y) production of alpha-alane is required. Laboratory-scale experimental work demonstrated that the yields of two of the three critical component steps within the overall “electrochemical process” were

  14. Low Cost Integrated Navigation System for Unmanned Vessel

    Directory of Open Access Journals (Sweden)

    Yang Changsong

    2017-11-01

    Full Text Available Large errors of low-cost MEMS inertial measurement unit (MIMU lead to huge navigation errors, even wrong navigation information. An integrated navigation system for unmanned vessel is proposed. It consists of a low-cost MIMU and Doppler velocity sonar (DVS. This paper presents an integrated navigation method, to improve the performance of navigation system. The integrated navigation system is tested using simulation and semi-physical simulation experiments, whose results show that attitude, velocity and position accuracy has improved awfully, giving exactly accurate navigation results. By means of the combination of low-cost MIMU and DVS, the proposed system is able to overcome fast drift problems of the low cost IMU.

  15. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  16. Calibration of low-cost gas sensors for an urban air quality monitoring network

    Science.gov (United States)

    Scott, A.; Kelley, C.; He, C.; Ghugare, P.; Lehman, A.; Benish, S.; Stratton, P.; Dickerson, R. R.; Zuidema, C.; Azdoud, Y.; Ren, X.

    2017-12-01

    In a warming world, environmental pollution may be exacerbated by anthropogenic activities, such as climate change and the urban heat island effect, as well as natural phenomena such as heat waves. However, monitoring air pollution at federal reference standards (approximately 1 part per billion or ppb for ambient ozone) is cost-prohibitive in heterogeneous urban areas as many expensive devices are required to fully capture a region's geo-spatial variability. Innovation in low-cost sensors provide a potential solution, yet technical challenges remain to overcome possible imprecision in the data. We present the calibrations of ozone and nitrous dioxide from a low-cost air quality monitoring device designed for the Baltimore Open Air Project. The sensors used in this study are commercially available thin film electrochemical sensors from SPEC Sensor, which are amperometric, meaning they generate current proportional to volumetric fraction of gas. The results of sensor calibrations in the laboratory and field are presented.

  17. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  18. Final Report for Project titled High Thermal Conductivity Polymer Composites for Low-Cost Heat Exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Thibaud-Erkey, Catherine [United Technologies reserach Center, East Hartford, CT (United States); Alahyari, Abbas [United Technologies reserach Center, East Hartford, CT (United States)

    2016-12-28

    Heat exchangers (HXs) are critical components in a wide range of heat transfer applications, from HVAC (Heating Ventilation and Cooling) to automobiles to manufacturing plants. They require materials capable of transferring heat at high rates while also minimizing thermal expansion over the usage temperature range. Conventionally, metals are used for applications where effective and efficient heat exchange is required, since many metals exhibit thermal conductivity over 100 W/m K. While metal HXs are constantly being improved, they still have some inherent drawbacks due to their metal construction, in particular corrosion. Polymeric material can offer solution to such durability issues and allow designs that cannot be afforded by metal construction either due to complexity or cost. A major drawback of polymeric material is their low thermal conductivity (0.1-0.5? W/mK) that would lead to large system size. Recent improvements in the area of filled polymers have highlighted the possibility to greatly improve the thermal conductivity of polymeric materials while retaining their inherent manufacturing advantage, and have been applied to heat sink applications. Therefore, the objective of this project was to develop a robust review of materials for the manufacturing of industrial and commercial non-metallic heat exchangers. This review consisted of material identification, literature evaluation, as well as empirical and model characterization, resulting in a database of relevant material properties and characteristics to provide guidance for future heat exchanger development.

  19. Development of Low Cost Soil Stabilization Using Recycled Material

    Science.gov (United States)

    Ahmad, F.; Yahaya, A. S.; Safari, A.

    2016-07-01

    Recycled tyres have been used in many geotechnical engineering projects such as soil improvement, soil erosion and slope stability. Recycled tyres mainly in chip and shredded form are highly compressible under low and normal pressures. This characteristic would cause challenging problems in some applications of soil stabilization such as retaining wall and river bank projects. For high tensile stress and low tensile strain the use of fiberglass would be a good alternative for recycled tyre in some cases. To evaluate fiberglass as an alternative for recycled tyre, this paper focused on tests of tensile tests which have been carried out between fiberglass and recycled tyre strips. Fibreglass samples were produced from chopped strand fibre mat, a very low-cost type of fibreglass, which is cured by resin and hardener. Fibreglass samples in the thickness of 1 mm, 2 mm, 3 mm and 4 mm were developed 100 mm x 300 mm pieces. It was found that 3 mm fibreglass exhibited the maximum tensile load (MTL) and maximum tensile stress (MTS) greater than other samples. Statistical analysis on 3 mm fibreglass indicated that in the approximately equal MTL fibreglass samples experienced 2% while tyre samples experienced 33.9% ultimate tensile strain (UTST) respectively. The results also showed an approximately linear relationship between stress and strain for fibreglass samples and Young's modulus (E), ranging from 3581 MPa to 4728 MPa.

  20. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  1. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  2. Sharing the cost of risky projects

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moulin, Hervé

    2018-01-01

    Users share the cost of unreliable non-rival projects (items). For instance, industry partners pay today for R&D that may or may not deliver a cure to some viruses, agents pay for the edges of a network that will cover their connectivity needs, but the edges may fail, etc. Each user has a binary...

  3. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  4. PERFORMANCE ASSESSMENT OF INTEGRATED SENSOR ORIENTATION WITH A LOW-COST GNSS RECEIVER

    Directory of Open Access Journals (Sweden)

    M. Rehak

    2017-08-01

    Full Text Available Mapping with Micro Aerial Vehicles (MAVs whose weight does not exceed 5 kg is gaining importance in applications such as corridor mapping, road and pipeline inspections, or mapping of large areas with homogeneous surface structure, e.g. forest or agricultural fields. In these challenging scenarios, integrated sensor orientation (ISO improves effectiveness and accuracy. Furthermore, in block geometry configurations, this mode of operation allows mapping without ground control points (GCPs. Accurate camera positions are traditionally determined by carrier-phase GNSS (Global Navigation Satellite System positioning. However, such mode of positioning has strong requirements on receiver’s and antenna’s performance. In this article, we present a mapping project in which we employ a single-frequency, low-cost (< $100 GNSS receiver on a MAV. The performance of the low-cost receiver is assessed by comparing its trajectory with a reference trajectory obtained by a survey-grade, multi-frequency GNSS receiver. In addition, the camera positions derived from these two trajectories are used as observations in bundle adjustment (BA projects and mapping accuracy is evaluated at check points (ChP. Several BA scenarios are considered with absolute and relative aerial position control. Additionally, the presented experiments show the possibility of BA to determine a camera-antenna spatial offset, so-called lever-arm.

  5. HOLE-BLOCKING LAYERS FOR SILICON/ORGANIC HETEROJUNCTIONS: A NEW CLASS OF HIGH-EFFICIENCY LOW-COST PV

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, James [Princeton Univ., NJ (United States)

    2017-12-04

    This project is the first investigation of the use of thin titanium dioxide layers on silicon as a hole-blocking / electron-transparent selective contact to silicon. The work was motivated by the goal of a high-efficiency low-cost silicon-based solar cells that could be processed entirely at low temperature (300 Degree Celsius) or less, without requiring plasma-processing.

  6. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  7. Low-Cost Methane Liquefaction Plant and Vehicle Refueling Station

    International Nuclear Information System (INIS)

    Wilding, B.; Bramwell, D.

    1999-01-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) is currently negotiating a collaborative effort with Pacific Gas and Electric (PG and E) that will advance the use of liquefied natural gas (LNG) as a vehicle fuel. We plan to develop and demonstrate a small-scale methane liquefaction plant (production of 5,000 to 10,000 gallons per day) and a low-cost ($150,000) LNG refueling station to supply fuel to LNG-powered transit buses and other heavy-duty vehicles. INEEL will perform the research and development work. PG and E will deploy the new facilities commercially in two demonstration projects, one in northern California, and one in southern California

  8. Analysis and evaluation of process and equipment in tasks 2 and 4 of the Low Cost Solar Array project

    Science.gov (United States)

    Goldman, H.; Wolf, M.

    1978-01-01

    Several experimental and projected Czochralski crystal growing process methods were studied and compared to available operations and cost-data of recent production Cz-pulling, in order to elucidate the role of the dominant cost contributing factors. From this analysis, it becomes apparent that substantial cost reductions can be realized from technical advancements which fall into four categories: an increase in furnace productivity; the reduction of crucible cost through use of the crucible for the equivalent of multiple state-of-the-art crystals; the combined effect of several smaller technical improvements; and a carry over effect of the expected availability of semiconductor grade polysilicon at greatly reduced prices. A format for techno-economic analysis of solar cell production processes was developed, called the University of Pennsylvania Process Characterization (UPPC) format. The accumulated Cz process data are presented.

  9. A low cost general purpose portable programmable master/slave manipulative appliance

    International Nuclear Information System (INIS)

    Cameron, W.

    1984-01-01

    The TRIUMF 100 μA 500 MeV cyclotron, located at the University of British Columbia, required a low cost, portable master/slave manipulative capability for experimental beam line servicing. A programmable capability was also required for the hot cell manipulators. A general purpose unit was developed that might also have applications in light manufacturing and medical rehabilitation. The project now in prototype testing represents a modular portable robot costing less than $5000 that is lead-through-teach programmable by either a master controller or hands-on lead-through. Task programs are stored and retrieved on any 32 k personal computer. An on-board proportional integral derivative controller (Motorola 6809 based) gives discrete positioning of the six degrees of freedom 2 kg capacity end effector

  10. Low-Cost Precursors to Novel Hydrogen Storage Materials

    International Nuclear Information System (INIS)

    Linehan, Suzanne W.; Chin, Arthur A.; Allen, Nathan T.; Butterick, Robert; Kendall, Nathan T.; Klawiter, I. Leo; Lipiecki, Francis J.; Millar, Dean M.; Molzahn, David C.; November, Samuel J.; Jain, Puja; Nadeau, Sara; Mancroni, Scott

    2010-01-01

    From 2005 to 2010, The Dow Chemical Company (formerly Rohm and Haas Company) was a member of the Department of Energy Center of Excellence on Chemical Hydrogen Storage, which conducted research to identify and develop chemical hydrogen storage materials having the potential to achieve DOE performance targets established for on-board vehicular application. In collaboration with Center co-leads Los Alamos National Laboratory (LANL) and Pacific Northwest National Laboratory (PNNL), and other Center partners, Dow's efforts were directed towards defining and evaluating novel chemistries for producing chemical hydrides and processes for spent fuel regeneration. In Phase 1 of this project, emphasis was placed on sodium borohydride (NaBH 4 ), long considered a strong candidate for hydrogen storage because of its high hydrogen storage capacity, well characterized hydrogen release chemistry, safety, and functionality. Various chemical pathways for regenerating NaBH 4 from spent sodium borate solution were investigated, with the objective of meeting the 2010/2015 DOE targets of $2-3/gal gasoline equivalent at the pump ($2-3/kg H 2 ) for on-board hydrogen storage systems and an overall 60% energy efficiency. With the September 2007 No-Go decision for NaBH 4 as an on-board hydrogen storage medium, focus was shifted to ammonia borane (AB) for on-board hydrogen storage and delivery. However, NaBH 4 is a key building block to most boron-based fuels, and the ability to produce NaBH 4 in an energy-efficient, cost-effective, and environmentally sound manner is critical to the viability of AB, as well as many leading materials under consideration by the Metal Hydride Center of Excellence. Therefore, in Phase 2, research continued towards identifying and developing a single low-cost NaBH4 synthetic route for cost-efficient AB first fill, and conducting baseline cost estimates for first fill and regenerated AB using a variety of synthetic routes. This project utilized an engineering

  11. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  12. A FRAMEWORK FOR LOW-COST MULTI-PLATFORM VR AND AR SITE EXPERIENCES

    Directory of Open Access Journals (Sweden)

    J. O. Wallgrün

    2017-11-01

    Full Text Available Low-cost consumer-level immersive solutions have the potential to revolutionize education and research in many fields by providing virtual experiences of sites that are either inaccessible, too dangerous, or too expensive to visit, or by augmenting in-situ experiences using augmented and mixed reality methods. We present our approach for creating low-cost multi-platform virtual and augmented reality site experiences of real world places for education and research purposes, making extensive use of Structure-from-Motion methods as well as 360° photography and videography. We discuss several example projects, for the Mayan City of Cahal Pech, Iceland’s Thrihnukar volcano, the Santa Marta informal settlement in Rio, and for the Penn State Campus, and we propose a framework for creating and maintaining such applications by combining declarative content specification methods with a central linked-data based spatio-temporal information system.

  13. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  14. Analysis of the production and transaction costs of forest carbon offset projects in the USA.

    Science.gov (United States)

    Galik, Christopher S; Cooley, David M; Baker, Justin S

    2012-12-15

    Forest carbon offset project implementation costs, comprised of both production and transaction costs, could present an important barrier to private landowner participation in carbon offset markets. These costs likewise represent a largely undocumented component of forest carbon offset potential. Using a custom spreadsheet model and accounting tool, this study examines the implementation costs of different forest offset project types operating in different forest types under different accounting and sampling methodologies. Sensitivity results are summarized concisely through response surface regression analysis to illustrate the relative effect of project-specific variables on total implementation costs. Results suggest that transaction costs may represent a relatively small percentage of total project implementation costs - generally less than 25% of the total. Results also show that carbon accounting methods, specifically the method used to establish project baseline, may be among the most important factors in driving implementation costs on a per-ton-of-carbon-sequestered basis, dramatically increasing variability in both transaction and production costs. This suggests that accounting could be a large driver in the financial viability of forest offset projects, with transaction costs likely being of largest concern to those projects at the margin. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. Production low cost plastic scintillator by using commercial polystyrene

    International Nuclear Information System (INIS)

    2011-01-01

    Plastic Scintillators can be described as solid materials which contain organic fluorescent compounds dissolved within a polymer matrix. Transparent plastics commonly used for light scintillation are Polystyrene (or PS, poly-vinyl-benzene) and polyvinyl-toluene (or PVT, poly-methyl-styron). By changing the composition of plastic Scintillators some features such as light yield, radiation hardening, decay time etc. can be controlled. Plastic scintillation detectors have been used in nuclear and high energy physics for many decades. Among their benefits are fast response, ease of manufacture and versatility. Their main drawbacks are radiation resistance and cost. Many research projects have concentrated on improving the fundamental properties of plastic scintillators, but little attention has focussed on their cost and easier manufacturing techniques. First plastic Scintillators were produced in 1950's. Activities for production of low cost Scintillators accelerated in second half of 1970's. In 1975 acrylic based Plexipop Scintillator was developed. Despite its low cost, since its structure was not aromatic the light yield of Plexipop was about one quarter of classical Scintillators. Problems arising from slow response time and weak mechanical properties in scintillators developed, has not been solved until 1980. Within the last decade extrusion method became very popular in preparation of low cost and high quality plastic scintillators. In this activity, preliminary studies for low cost plastic scintillator production by using commercial polystyrene pellets and extrusion plus compression method were aimed. For this purpose, PS blocks consist of commercial fluorescent dopant were prepared in June 2008 by use of the extruder and pres in SANAEM. Molds suitable for accoupling to extruder were designed and manufactured and optimum production parameters such as extrusion temperature profile, extrusion rate and moulding pressure were obtained hence, PS Scintillator Blocks

  16. A low-cost colorimeter.

    Science.gov (United States)

    Jones, N B; Riley, C; Sheya, M S; Hosseinmardi, M M

    1984-01-01

    A need for a colorimeter with low capital and maintenance costs has been suggested for countries with foreign exchange problems and no local medical instrumentation industry. This paper puts forward a design for such a device based on a domestic light-bulb, photographic filters and photovoltaic cells. The principle of the design is the use of a balancing technique involving twin light paths for test solution and reference solution and an electronic bridge circuit. It is shown that proper selection of the components will allow the cost objectives to be met and also provide acceptable linearity, precision, accuracy and repeatability.

  17. Cost Effective Recovery of Low-TDS Frac Flowback Water for Re-use

    Energy Technology Data Exchange (ETDEWEB)

    Claire Henderson; Harish Acharya; Hope Matis; Hareesh Kommepalli; Brian Moore; Hua Wang

    2011-03-31

    The project goal was to develop a cost-effective water recovery process to reduce the costs and envi-ronmental impact of shale gas production. This effort sought to develop both a flowback water pre-treatment process and a membrane-based partial demineralization process for the treatment of the low-Total Dissolved Solids (TDS) portion of the flowback water produced during hydrofracturing operations. The TDS cutoff for consideration in this project is < 35,000 {approx} 45,000 ppm, which is the typical limit for economic water recovery employing reverse osmosis (RO) type membrane desalination processes. The ultimate objective is the production of clean, reclaimed water suitable for re-use in hydrofracturing operations. The team successfully compiled data on flowback composition and other attributes across multiple shale plays, identified the likely applicability of membrane treatment processes in those shales, and expanded the proposed product portfolio to include four options suitable for various reuse or discharge applications. Pretreatment technologies were evaluated at the lab scale and down-selected based upon their efficacy in removing key contaminants. The chosen technologies were further validated by performing membrane fouling studies with treated flowback water to demonstrate the technical feasibility of flowback treatment with RO membranes. Process flow schemes were constructed for each of the four product options based on experimental performance data from actual flowback water treatment studies. For the products requiring membrane treatment, membrane system model-ing software was used to create designs for enhanced water recovery beyond the typical seawater desalination benchmark. System costs based upon vendor and internal cost information for all process flow schemes were generated and are below target and in line with customer expectations. Finally, to account for temporal and geographic variability in flowback characteristics as well as local

  18. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  19. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  20. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  1. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  2. Low Cost/Low Noise Variable Pitch Ducted Fan, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — ACI proposes a design for a Propulsor (Low Cost/Low Noise Variable Pitch Ducted Fan) that has wide application in all sectors of Aviation. Propulsor hardware of this...

  3. OPTIMIZATION OF TIMES AND COSTS OF PROJECT OF HORIZONTAL LAMINATOR PRODUCTION USING PERT/CPM TECHNICAL

    Directory of Open Access Journals (Sweden)

    Fernando Henrique Lermen

    2016-09-01

    Full Text Available The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.

  4. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1997-01-01

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations

  5. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, W.W.

    1997-12-30

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

  6. 13 CFR 120.882 - Eligible Project costs for 504 loans.

    Science.gov (United States)

    2010-01-01

    ... financing including points, fees and interest. (e) If the project involves expansion of a small business... expansion of a small business concern” includes any project that involves the acquisition, construction or... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Eligible Project costs for 504...

  7. Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones-Albertus, Rebecca [U.S. Department of Energy

    2018-04-02

    The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as well as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.

  8. Low-Cost Servomotor Driver for PFM Control.

    Science.gov (United States)

    Aragon-Jurado, David; Morgado-Estevez, Arturo; Perez-Peña, Fernando

    2017-12-31

    Servomotors have already been around for some decades and they are extremely popular among roboticists due to their simple control technique, reliability and low-cost. They are usually controlled by using Pulse Width Modulation (PWM) and this paper aims to keep the idea of simplicity and low-cost, while introducing a new control technique: Pulse Frequency Modulation (PFM). The objective of this paper is to focus on our development of a low-cost servomotor controller which will allow the research community to use them with PFM. A low-cost commercial servomotor is used as the base system for the development: a small PCB that fits inside the case and allocates all the electronic components to control the motor has been designed to replace the original. The potentiometer is retained as the feedback sensor and a microcontroller is responsible for controlling the position of the motor. The paper compares the performance of a PWM and a PFM controlled servomotor. The comparison shows that the servomotor with our controller achieves a faster mechanism for switching targets and a lower latency. This controller can be used with neuromorphic systems to remove the conversion from events to PWM.

  9. Low profile, low cost, new geometry integrated inductors

    DEFF Research Database (Denmark)

    Ouyang, Ziwei; Thomsen, Ole Cornelius; Andersen, Michael A. E.

    2011-01-01

    windings with well-defined thickness. Many advantages and disadvantages are described in depth. In this work, inverse coupling and direct coupling in the new geometry integrated inductors have been analyzed. Coupling characteristic caused by a special saturation behavior has been emphasis. And also...... variable inductors caused by the special saturation behavior may be utilized in some applications. The new integrated inductors make it possible to build low-profile, low-cost, flexibility DC/DC converters, and it can be extensively designed for the low-voltage and high-current required by the modern...

  10. The high cost of low-acuity ICU outliers.

    Science.gov (United States)

    Dahl, Deborah; Wojtal, Greg G; Breslow, Michael J; Holl, Randy; Huguez, Debra; Stone, David; Korpi, Gloria

    2012-01-01

    Direct variable costs were determined on each hospital day for all patients with an intensive care unit (ICU) stay in four Phoenix-area hospital ICUs. Average daily direct variable cost in the four ICUs ranged from $1,436 to $1,759 and represented 69.4 percent and 45.7 percent of total hospital stay cost for medical and surgical patients, respectively. Daily ICU cost and length of stay (LOS) were higher in patients with higher ICU admission acuity of illness as measured by the APACHE risk prediction methodology; 16.2 percent of patients had an ICU stay in excess of six days, and these LOS outliers accounted for 56.7 percent of total ICU cost. While higher-acuity patients were more likely to be ICU LOS outliers, 11.1 percent of low-risk patients were outliers. The low-risk group included 69.4 percent of the ICU population and accounted for 47 percent of all LOS outliers. Low-risk LOS outliers accounted for 25.3 percent of ICU cost and incurred fivefold higher hospital stay costs and mortality rates. These data suggest that severity of illness is an important determinant of daily resource consumption and LOS, regardless of whether the patient arrives in the ICU with high acuity or develops complications that increase acuity. The finding that a substantial number of long-stay patients come into the ICU with low acuity and deteriorate after ICU admission is not widely recognized and represents an important opportunity to improve patient outcomes and lower costs. ICUs should consider adding low-risk LOS data to their quality and financial performance reports.

  11. Low-cost in vitro fertilization: current insights

    Directory of Open Access Journals (Sweden)

    Teoh PJ

    2014-08-01

    Full Text Available Pek Joo Teoh, Abha MaheshwariAberdeen Fertility Centre, Aberdeen Maternity Hospital, University of Aberdeen, Aberdeen, UKAbstract: Despite the development of in vitro fertilization (IVF more than 30 years ago, the cost of treatment remains high. Furthermore, over the years, more sophisticated technologies and expensive medications have been introduced, making IVF increasingly inaccessible despite the increasing need. Globally, the option to undergo IVF is only available to a privileged few. In recent years, there has been growing interest in exploring strategies to reduce the cost of IVF treatment, which would allow the service to be provided in low-resource settings. In this review, we explore the various ways in which the cost of this treatment can be reduced.Keywords: IVF, low-cost, accessible, developing world

  12. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  13. Low cost design of microprocessor EDAC circuit

    International Nuclear Information System (INIS)

    Hao Li; Yu Lixin; Peng Heping; Zhuang Wei

    2015-01-01

    An optimization method of error detection and correction (EDAC) circuit design is proposed. The method involves selecting or constructing EDAC codes of low cost hardware, associated with operation scheduling implementation based on 2-input XOR gates structure, and two actions for reducing hardware cells, which can reduce the delay penalties and area costs of the EDAC circuit effectively. The 32-bit EDAC circuit hardware implementation is selected to make a prototype, based on the 180 nm process. The delay penalties and area costs of the EDAC circuit are evaluated. Results show that the time penalty and area cost of the EDAC circuitries are affected with different parity-check matrices and different hardware implementation for the EDAC codes with the same capability of correction and detection code. This method can be used as a guide for low-cost radiation-hardened microprocessor EDAC circuit design and for more advanced technologies. (paper)

  14. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects

    Science.gov (United States)

    1997-02-01

    The General Accounting Office (GAO) was requested to assess the effectiveness of the Federal Highway Administration's (FHWA's) oversight of the costs of large-dollar highway and bridge projects (those with a total estimated cost of over $100 million)...

  15. Product platform considerations on a project that develops sustainable low-cost housing for townships

    DEFF Research Database (Denmark)

    Wörösch, Michael; Bonev, Martin; Mortensen, Niels Henrik

    Construction companies in Denmark are often working with profit margins as little as 1-3% in situations where they deliver high-end buildings to the local market. Even though customers are willing to pay a premium price for high quality, construction companies earn very little on their products...... their new owners the possibility to take a loan in their building which is expected to contribute to more businesses being started up and thereby strengthening the domestic economy. As a consequence of this, additional research is needed in how to further optimize the economy of sustainable low-cost housing...

  16. 20 CFR 408.816 - When does SVB entitlement end due to death?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false When does SVB entitlement end due to death? 408.816 Section 408.816 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SPECIAL BENEFITS FOR CERTAIN WORLD WAR II VETERANS Suspensions and Terminations Termination § 408.816 When does SVB entitlement end due to death? Your SVB entitlement ends wit...

  17. Low-Cost Precursors to Novel Hydrogen Storage Materials

    Energy Technology Data Exchange (ETDEWEB)

    Suzanne W. Linehan; Arthur A. Chin; Nathan T. Allen; Robert Butterick; Nathan T. Kendall; I. Leo Klawiter; Francis J. Lipiecki; Dean M. Millar; David C. Molzahn; Samuel J. November; Puja Jain; Sara Nadeau; Scott Mancroni

    2010-12-31

    From 2005 to 2010, The Dow Chemical Company (formerly Rohm and Haas Company) was a member of the Department of Energy Center of Excellence on Chemical Hydrogen Storage, which conducted research to identify and develop chemical hydrogen storage materials having the potential to achieve DOE performance targets established for on-board vehicular application. In collaboration with Center co-leads Los Alamos National Laboratory (LANL) and Pacific Northwest National Laboratory (PNNL), and other Center partners, Dow's efforts were directed towards defining and evaluating novel chemistries for producing chemical hydrides and processes for spent fuel regeneration. In Phase 1 of this project, emphasis was placed on sodium borohydride (NaBH{sub 4}), long considered a strong candidate for hydrogen storage because of its high hydrogen storage capacity, well characterized hydrogen release chemistry, safety, and functionality. Various chemical pathways for regenerating NaBH{sub 4} from spent sodium borate solution were investigated, with the objective of meeting the 2010/2015 DOE targets of $2-3/gal gasoline equivalent at the pump ($2-3/kg H{sub 2}) for on-board hydrogen storage systems and an overall 60% energy efficiency. With the September 2007 No-Go decision for NaBH{sub 4} as an on-board hydrogen storage medium, focus was shifted to ammonia borane (AB) for on-board hydrogen storage and delivery. However, NaBH{sub 4} is a key building block to most boron-based fuels, and the ability to produce NaBH{sub 4} in an energy-efficient, cost-effective, and environmentally sound manner is critical to the viability of AB, as well as many leading materials under consideration by the Metal Hydride Center of Excellence. Therefore, in Phase 2, research continued towards identifying and developing a single low-cost NaBH4 synthetic route for cost-efficient AB first fill, and conducting baseline cost estimates for first fill and regenerated AB using a variety of synthetic routes. This

  18. Comparative life-cycle cost analysis for low-level mixed waste remediation alternatives

    International Nuclear Information System (INIS)

    Jackson, J.A.; White, T.P.; Kloeber, J.M.; Toland, R.J.; Cain, J.P.; Buitrago, D.Y.

    1995-03-01

    The purpose of this study is two-fold: (1) to develop a generic, life-cycle cost model for evaluating low-level, mixed waste remediation alternatives, and (2) to apply the model specifically, to estimate remediation costs for a site similar to the Fernald Environmental Management Project near Cincinnati, OH. Life-cycle costs for vitrification, cementation, and dry removal process technologies are estimated. Since vitrification is in a conceptual phase, computer simulation is used to help characterize the support infrastructure of a large scale vitrification plant. Cost estimating relationships obtained from the simulation data, previous cost estimates, available process data, engineering judgment, and expert opinion all provide input to an Excel based spreadsheet for generating cash flow streams. Crystal Ball, an Excel add-on, was used for discounting cash flows for net present value analysis. The resulting LCC data was then analyzed using multi-attribute decision analysis techniques with cost and remediation time as criteria. The analytical framework presented allows alternatives to be evaluated in the context of budgetary, social, and political considerations. In general, the longer the remediation takes, the lower the net present value of the process. This is true because of the time value of money and large percentage of the costs attributed to storage or disposal

  19. Entitlement to vote in the Canton of Geneva and entitlement to vote and eligibility for election in the Canton of Vaud

    CERN Multimedia

    DG Unit

    2011-01-01

    You are reminded that, at commune level, certain international civil servants and their family members: are entitled to vote in the Canton of Geneva are entitled to vote and are eligible for election in the Canton of Vaud. For further information, in particular regarding the special procedure to be followed to apply to exercise these entitlements, you are invited to consult the information published, in French only, on the Swiss Mission’s website (topic « Privileges and immunities (Manual) » : http://www.eda.admin.ch/eda/fr/home/topics/intorg/un/unge/gepri/manvot/manvt1.html (for the Canton of Geneva), http://www.eda.admin.ch/eda/fr/home/topics/intorg/un/unge/gepri/manvot/manvt2.html (for the Canton of Vaud). The dates of the forthcoming ballots are available on the official websites of the cantonal administrative authorities : for Geneva: http://www.ge.ch/votations-elections/prochains-scrutins/; for Vaud: http://www.vd.ch/fr/themes/etat-droit-financ...

  20. Entitlement to vote in the Canton of Geneva and entitlement to vote and eligibility for election in the Canton of Vaud

    CERN Multimedia

    DG Unit

    2009-01-01

    You are reminded that, at commune level, certain international civil servants and their family members: are entitled to vote in the Canton of Geneva are entitled to vote and are eligible for election in the Canton of Vaud. For further information, in particular regarding the special procedure to be followed to apply to exercise these entitlements, you are invited to consult the information published, in French only, on the Swiss Mission’s website: for the Canton of Genevafor the Canton of VaudThe dates of the forthcoming ballots are available on the official websites of the cantonal administrative authorities: for Geneva: referendum and forthcoming ballots ; for Vaud: forthcoming ballots In this context, please note, especially with regard to eligibility for election, that: in accordance with Articles S I 3.05 and I 3.06 of the Staff Rules "Members of the personnel wishing to take part in the public and political life of a State shall comply with the relevant legislat...

  1. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    Science.gov (United States)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  2. Low-Cost Behavioral Nudges Increase Medicaid Take-Up Among Eligible Residents Of Oregon.

    Science.gov (United States)

    Wright, Bill J; Garcia-Alexander, Ginny; Weller, Margarette A; Baicker, Katherine

    2017-05-01

    Efforts to reduce the ranks of the uninsured hinge on take-up of available programs and subsidies, but take-up of even free insurance is often less than complete. The evidence of the effectiveness of policies aiming to increase take-up is limited. We used a randomized controlled design to evaluate the impact of improved communication and behaviorally informed "nudges" designed to increase Medicaid take-up among eligible populations. Fielding randomized interventions in two different study populations in Oregon, we found that even very low-cost interventions substantially increased enrollment. Effects were larger in a population whose members had already expressed interest in obtaining coverage, but the effects were more persistent in low-income populations whose members were already enrolled in other state assistance programs but had not expressed interest in health insurance. The effects were similar across different demographic groups. Our results suggest that improving the design of enrollment processes and using low-cost mass-outreach efforts have the potential to substantially increase insurance coverage of vulnerable populations. Project HOPE—The People-to-People Health Foundation, Inc.

  3. Uncertainty in air quality observations using low-cost sensors

    Science.gov (United States)

    Castell, Nuria; Dauge, Franck R.; Dongol, Rozina; Vogt, Matthias; Schneider, Philipp

    2016-04-01

    due to changes in the environmental conditions. Currently there is a lack of testing to ensure adequate sensor performance prior to marketing such instruments. Even when manufacturers provide detailed specification sheets, there is little guarantee that the specifications can actually be met in real-world conditions. Data quality is a pertinent concern, especially when citizens are collecting and interpreting the data by themselves. Poor or unknown data quality can lead to incorrect or inappropriate decisions. We present the experiences gained within the EU project CITI-SENSE, where low-cost sensors are one of the tools employed to empower citizens in air quality issues.

  4. Arduino: a low-cost multipurpose lab equipment.

    Science.gov (United States)

    D'Ausilio, Alessandro

    2012-06-01

    Typical experiments in psychological and neurophysiological settings often require the accurate control of multiple input and output signals. These signals are often generated or recorded via computer software and/or external dedicated hardware. Dedicated hardware is usually very expensive and requires additional software to control its behavior. In the present article, I present some accuracy tests on a low-cost and open-source I/O board (Arduino family) that may be useful in many lab environments. One of the strengths of Arduinos is the possibility they afford to load the experimental script on the board's memory and let it run without interfacing with computers or external software, thus granting complete independence, portability, and accuracy. Furthermore, a large community has arisen around the Arduino idea and offers many hardware add-ons and hundreds of free scripts for different projects. Accuracy tests show that Arduino boards may be an inexpensive tool for many psychological and neurophysiological labs.

  5. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  6. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  7. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  8. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  9. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  10. Norwich Technologies' Advanced Low-Cost Receivers for Parabolic Troughs

    Energy Technology Data Exchange (ETDEWEB)

    Stettenheim, Joel [Norwich Technologies, White River Junction, VT (United States); McBride, Troy O. [Norwich Technologies, White River Junction, VT (United States); Brambles, Oliver J. [Norwich Technologies, White River Junction, VT (United States); Cashin, Emil A. [Norwich Technologies, White River Junction, VT (United States)

    2013-12-31

    This report summarizes the successful results of our SunShot project, Advanced Low-Cost Receivers for Parabolic Troughs. With a limited budget of $252K and in only 12 months, we have (1) developed validated optical and thermal models and completed rigorous optimization analysis to identify key performance characteristics as part of developing first-generation laboratory prototype designs, (2) built optical and thermal laboratory prototypes and test systems with associated innovative testing protocols, and (3) performed extensive statistically relevant testing. We have produced fully functioning optical and thermal prototypes and accurate, validated models shown to capture important underlying physical mechanisms. The test results from the first-generation prototype establish performance exceeding the FOA requirement of thermal efficiency >90% for a CSP receiver while delivering an exit fluid temperature of > 650 °C and a cost < $150/kWth. Our vacuum-free SunTrap receiver design provides improvements over conventional vacuum-tube collectors, allowing dramatic reductions in thermal losses at high operating temperature.

  11. Hacking for astronomy: can 3D printers and open-hardware enable low-cost sub-/millimeter instrumentation?

    Science.gov (United States)

    Ferkinhoff, Carl

    2014-07-01

    There have been several exciting developments in the technologies commonly used n in the hardware hacking community. Advances in low cost additive-manufacturing processes (i.e. 3D-printers) and the development of openhardware projects, which have produced inexpensive and easily programmable micro-controllers and micro-computers (i.e. Arduino and Raspberry Pi) have opened a new door for individuals seeking to make their own devices. Here we describe the potential for these technologies to reduce costs in construction and development of submillimeter/millimeter astronomical instrumentation. Specifically we have begun a program to measure the optical properties of the custom plastics used in 3D-printers as well as the printer accuracy and resolution to assess the feasibility of directly printing sub- /millimeter transmissive optics. We will also discuss low cost designs for cryogenic temperature measurement and control utilizing Arduino and Raspberry Pi.

  12. Academic Entitlement and Its Relationship with Perception of Cheating Ethics

    Science.gov (United States)

    Elias, Rafik Z.

    2017-01-01

    Cheating is an epidemic in higher education. The author examined the psychological variable of academic entitlement and its relationship with the ethical perception of cheating using a sample of business students. Contrary to some previous research, the author found that millennials were only slightly more academically entitled than students from…

  13. Low-cost sensors to monitor groundwater drought in Somalia

    Science.gov (United States)

    Buytaert, W.; Ochoa-Tocachi, B. F.; Caniglia, D.; Haibe, K.; Butler, A. P.

    2017-12-01

    Somalia is one of the poorest countries in the world, devastated by conflict and suffering from the most severe droughts in living memory. Over 6 million people are in need of assistance, and about 3 million are threatened with famine. In April 2017, the WHO estimated that more than 25,000 people have been struck by cholera or acute watery diarrhoea and this number is rising quickly. About half a million Somalis have been displaced internally, many of which in search of water. Some 3 million pastoralists have lost 70% of livestock as a result of the drought. Humanitarian organisations and government agencies invest large amounts of resources to alleviate these conditions. It is paramount to inform the design, focus, and optimisation of these interventions by monitoring and quantifying water resources. Yet, regions such as Somalia are extremely sparsely gauged as a result of a combination of lack of resources and technical expertise, as well as the harsh geographical and geopolitical conditions. Low-cost, robust, and reliable sensors may provide a potential solution to this problem. We present the results of a research project that aimed to leverage new developments in sensor, logger, and data transmission technologies to develop low-cost water level sensors to monitor hand-dug groundwater wells in real time. We tested 3 types of sensor types, i.e. pressure transducers, ultrasound-based distance sensors, and lidar, which were coupled to low-cost logging systems. The different designs were tested both in laboratory conditions, and in-situ in hand-dug wells in Somaliland. Our results show that it is technically possible to build sensors with a total cost of around US$250 each, which are fit-for-purpose for the required application. In-situ deployment over a period of 2 months highlights their robustness despite severe logistical and practical challenges, though further tests are required to understand their long-term reliability. Operating the sensors at one

  14. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  15. High-Efficient Low-Cost Photovoltaics Recent Developments

    CERN Document Server

    Petrova-Koch, Vesselinka; Goetzberger, Adolf

    2009-01-01

    A bird's-eye view of the development and problems of recent photovoltaic cells and systems and prospects for Si feedstock is presented. High-efficient low-cost PV modules, making use of novel efficient solar cells (based on c-Si or III-V materials), and low cost solar concentrators are in the focus of this book. Recent developments of organic photovoltaics, which is expected to overcome its difficulties and to enter the market soon, are also included.

  16. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  17. Entitlement Attitudes Predict Students' Poor Performance in Challenging Academic Conditions

    Science.gov (United States)

    Anderson, Donna; Halberstadt, Jamin; Aitken, Robert

    2013-01-01

    Excessive entitlement--an exaggerated or unrealistic belief about what one deserves--has been associated with a variety of maladaptive behaviors, including a decline in motivation and effort. In the context of tertiary education, we reasoned that if students expend less effort to obtain positive outcomes to which they feel entitled, this should…

  18. Optical incremental rotary encoder in low-cost-design; Optischer inkrementaler Drehgeber in Low-Cost-Bauweise

    Energy Technology Data Exchange (ETDEWEB)

    Hopp, David; Pruss, Christof; Osten, Wolfgang [Stuttgart Univ. (Germany). Inst. fuer Technische Optik; Seybold, Jonathan; Mayer, Volker [Hans-Schickard-Gesellschaft, Stuttgart (DE). Inst. fuer Mikroaufbautechnik (IMAT); Kueck, Heinz [Hans-Schickard-Gesellschaft, Stuttgart (DE). Inst. fuer Mikroaufbautechnik (IMAT); Stuttgart Univ. (Germany). Inst. fuer Zeitmesstechnik, Fein- und Mikrotechnik

    2010-07-01

    We have developed a new concept for low-cost optical encoders to come up to meet the increasing demand for inexpensive rotary sensors. The principal idea is to use a micro patterned plastic disc with metal coating, as it is used for Compact Discs or DVDs. Such encoder discs can be manufactured by an efficient injection compression moulding process. With this well established technique it is possible to achieve highly precise micro patterns while running a cost effective process for high volume production. (orig.)

  19. Development of low-cost digital subtraction angiography system

    International Nuclear Information System (INIS)

    Ando, Yutaka; Kobayashi, Takeshi; Imai, Yutaka; Yagishita, Akira; Kunieda, Etsuo.

    1983-01-01

    We developed a simple and low-cost DSA system. This system consists of a conventional fluoroscopic equipment for the GI tract and a mini-computer (GAMMA-11) which are connected each other with a video-disc recorder. The uniqueness of our system are 1. low-cost, 2. low-radiation dose, 3. off-line processing, 4. flexibility of software. The analysis of the time-density curve and image processing will bring us a more usefull information than DSA alone. (author)

  20. A Low Cost Inflatable CubeSat Drag Brake Utilizing Sublimation

    Science.gov (United States)

    Horn, Adam Charles

    The United Nations Inter-Agency Debris Coordination Committee has adopted a 25-year post-mission lifetime requirement for any satellite orbiting below 2000 km in order to mitigate the growing orbital debris threat. Low-cost CubeSats have become important satellite platforms with startling capabilities, but this guideline restricts them to altitudes below 600 km because they remain in orbit too long. In order to enable CubeSat deployments at higher release altitudes, a low-cost, ultra-reliable deorbit device is needed. This thesis reports on efforts to develop a deployable and passively inflatable drag brake that can deorbit from higher orbital altitudes, thereby complying with the 25-year orbital lifetime guideline. On the basis of concepts first implemented during the NASA Echo Satellite Project, this study investigated the design of an inflatable CubeSat drag device that utilizes sublimating benzoic acid powder as the inflation propellant. Testing has focused on demonstrating the functionality of charging a Mylar drag brake bladder with appropriate quantities of benzoic acid powder, and the exposure to a controlled-temperature vacuum chamber causing the bladder to inflate. Although results show a measureable increase in internal pressure when introduced to anticipated orbital temperatures, a significant air-derived expansion prior to sublimation was encountered due to the undetectable volume of ambient residual air in the fabricated membrane bladders. These tests have demonstrated the feasibility of this approach, thereby demonstrating that this concept can create a potentially smaller and less expensive drag device, eliminating inflation gas tanks and valves. In that way, this system can provide a low-cost, miniaturized system that reduces a CubeSat's orbital lifetime to less than 25 years, when placed at higher orbital altitude.

  1. Scale-up of Novel Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

    Energy Technology Data Exchange (ETDEWEB)

    Spalding, Mark A [The Dow Chemical Company

    2014-08-27

    on the high levelized economic cost of the process relative to the manufacture of CF from polyacrylonitrile (PAN) precursor fibers. The capital required to sulfonate the fibers adds a significant cost to the process due to the need for investment in a sulfuric acid recovery plant. This high additional capital over the capital for a PAN based CF plant, reduces the levelized economic cost to slightly advantaged over PAN based CF. The sulfonation-desulfonation stabilization route failed to meet the Dow’s return on investment criterion and the cost advantage target set forth for the DOE project. The DOE and Dow decided to halt spending on the project until a new PO fiber stabilization process could be identified that met the DOE physical properties standard and the levelized economic cost constraints of Dow. When the new technology was developed, then award DE-EE0005760 would be re-started with the same goals of the development of a market development plant capable of producing CF at 4 kg/h with the properties that met or exceed those set forth by the Department of Energy Vehicles Technology standard. Progress on the development of the new process has been slow and thus has delayed the scale up project. Dow’s efforts to date have not progressed to the point of demonstrating a commercially-viable process for production of low cost CF from PO precursors for Dow’s rigorous economic constraints. After extensive discussions within Dow and consultation with DOE’s Advanced Manufacturing Office (AMO) Headquarters and Golden Field Office teams, Dow has decided to proceed with the formal recommendation to terminate subject project. DOE’s AMO Headquarters and Golden Field Office teams agreed with the termination of the project.

  2. Ultra Low Sulfur Home Heating Oil Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Batey, John E. [Energy Research Center, Inc., Easton, CT (United States); McDonald, Roger [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-09-30

    This Ultra Low Sulfur (ULS) Home Heating Oil Demonstration Project was funded by the New York State Energy Research and Development Authority (NYSERDA) and has successfully quantified the environmental and economic benefits of switching to ULS (15 PPM sulfur) heating oil. It advances a prior field study of Low Sulfur (500 ppm sulfur) heating oil funded by NYSERDA and laboratory research conducted by Brookhaven National Laboratory (BNL) and Canadian researchers. The sulfur oxide and particulate matter (PM) emissions are greatly reduced as are boiler cleaning costs through extending cleaning intervals. Both the sulfur oxide and PM emission rates are directly related to the fuel oil sulfur content. The sulfur oxide and PM emission rates approach near-zero levels by switching heating equipment to ULS fuel oil, and these emissions become comparable to heating equipment fired by natural gas. This demonstration project included an in-depth review and analysis of service records for both the ULS and control groups to determine any difference in the service needs for the two groups. The detailed service records for both groups were collected and analyzed and the results were entered into two spreadsheets that enabled a quantitative side-by-side comparison of equipment service for the entire duration of the ULS test project. The service frequency for the ULS and control group were very similar and did indicate increased service frequency for the ULS group. In fact, the service frequency with the ULS group was slightly less (7.5 percent) than the control group. The only exception was that three burner fuel pump required replacement for the ULS group and none were required for the control group.

  3. SeeStar: an open-source, low-cost imaging system for subsea observations

    Science.gov (United States)

    Cazenave, F.; Kecy, C. D.; Haddock, S.

    2016-02-01

    Scientists and engineers at the Monterey Bay Aquarium Research Institute (MBARI) have collaborated to develop SeeStar, a modular, light weight, self-contained, low-cost subsea imaging system for short- to long-term monitoring of marine ecosystems. SeeStar is composed of separate camera, battery, and LED lighting modules. Two versions of the system exist: one rated to 300 meters depth, the other rated to 1500 meters. Users can download plans and instructions from an online repository and build the system using low-cost off-the-shelf components. The system utilizes an easily programmable Arduino based controller, and the widely distributed GoPro camera. The system can be deployed in a variety of scenarios taking still images and video and can be operated either autonomously or tethered on a range of platforms, including ROVs, AUVs, landers, piers, and moorings. Several Seestar systems have been built and used for scientific studies and engineering tests. The long-term goal of this project is to have a widely distributed marine imaging network across thousands of locations, to develop baselines of biological information.

  4. Development of Manufacturing Technology to Accelerate Cost Reduction of Low Concentration and

    Energy Technology Data Exchange (ETDEWEB)

    Detrick, Adam [The Solaria Corporation, Fremont, CA (United States)

    2017-09-27

    The purpose of this project was to accelerate deployment of cost-effective US-based manufacturing of Solaria’s unique c-Si module technology. This effort successfully resulted in the development of US-based manufacturing technology to support two highly-differentiated, market leading product platforms. The project was initially predicated on developing Solaria’s low-concentration PV (LCPV) module technology which at the time of the award was uniquely positioned to exceed the SunShot price goal of $0.50/Wp for standard c-Si modules. The Solaria LCPV module is a 2.5x concentrator that leverages proven, high-reliability PV module materials and low silicon cell usage into a technology package that already had the lowest direct material cost and leading Levelized Cost of Electricity (LCOE). With over 25 MW commercially deployed globally, the Solaria module was well positioned to continue to lead in PV module cost reduction. Throughout the term of the contract, market conditions changed dramatically and so to did Solaria’s product offerings to support this. However, the manufacturing technology developed for the LCPV module was successfully leveraged and optimized to support two new and different product platforms. BIPV “PowerVision” and High-efficiency “PowerXT” modules. The primary barrier to enabling high-volume PV module manufacturing in the US is the high manual labor component in certain unique aspects of our manufacturing process. The funding was used to develop unique manufacturing automation which makes the manual labor components of these key processes more efficient and increase throughput. At the core of Solaria’s product offerings are its unique and proprietary techniques for dicing and re-arranging solar cells into modules with highly-differentiated characteristics that address key gaps in the c-Si market. It is these techniques that were successfully evolved and deployed into US-based manufacturing site with SunShot funding. Today, Solaria

  5. Organizing for low cost space operations - Status and plans

    Science.gov (United States)

    Lee, C.

    1976-01-01

    Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

  6. A Low Cost Rokkaku Kite Setup for Aerial Photogrammetric System

    Science.gov (United States)

    Khan, A. F.; Khurshid, K.; Saleh, N.; Yousuf, A. A.

    2015-03-01

    Orthogonally Projected Area (OPA) of a geographical feature has primarily been studied utilizing rather time consuming field based sampling techniques. Remote sensing on the contrary provides the ability to acquire large scale data at a snapshot of time and lets the OPA to be calculated conveniently and with reasonable accuracy. Unfortunately satellite based remote sensing provides data at high cost and limited spatial resolution for scientific studies focused at small areas such as micro lakes micro ecosystems, etc. More importantly, recent satellite data may not be readily available for a particular location. This paper describes a low cost photogrammetric system to measure the OPA of a small scale geographic feature such as a plot of land, micro lake or an archaeological site, etc. Fitted with a consumer grade digital imaging system, a Rokkaku kite aerial platform with stable flight characteristics is designed and fabricated for image acquisition. The data processing procedure involves automatic Ground Control Point (GCP) detection, intelligent target area shape determination with minimal human input. A Graphical User Interface (GUI) is built from scratch in MATLAB to allow the user to conveniently process the acquired data, archive and retrieve the results. Extensive on-field experimentation consists of multiple geographic features including flat land surfaces, buildings, undulating rural areas, and an irregular shaped micro lake, etc. Our results show that the proposed system is not only low cost, but provides a framework that is easy and fast to setup while maintaining the required constraints on the accuracy.

  7. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  8. A Longitudinal Study of Sexual Entitlement and Self-Efficacy among Young Women and Men: Gender Differences and Associations with Age and Sexual Experience

    Directory of Open Access Journals (Sweden)

    Gillian Hewitt-Stubbs

    2016-01-01

    Full Text Available Many scholars have called for an increased focus on positive aspects of sexual health and sexuality. Using a longitudinal design with two assessments, we investigated patterns of entitlement to sexual partner pleasure and self-efficacy to achieve sexual pleasure among 295 young men and women aged 17–25 years attending one Australian university. We also tested whether entitlement and efficacy differed by gender, and hypothesized that entitlement and efficacy would be higher in older participants and those with more sexual experience. A sense of entitlement to sexual partner pleasure increased significantly over the year of the study, whereas, on average, there was no change in self-efficacy over time. At Time 1 (T1, young women reported more entitlement than young men. Age was positively associated with T1 entitlement, and experience with a wider range of partnered sexual behaviors was concurrently associated with more entitlement and efficacy and was also associated with increased entitlement to partner pleasure and increased self-efficacy in achieving sexual pleasure at T2 relative to T1. A group with the least amount of sexual experience was particularly low in entitlement and efficacy when compared to groups with a history of coital experience. There was no evidence that any association differed between young men and young women. Limitations of the study include a sample of predominantly middle class, Caucasian students at one university and the possibility that students more interested in sex and relationships, and with more sexual experience, chose to participate.

  9. A Longitudinal Study of Sexual Entitlement and Self-Efficacy among Young Women and Men: Gender Differences and Associations with Age and Sexual Experience

    Science.gov (United States)

    Hewitt-Stubbs, Gillian; Zimmer-Gembeck, Melanie J.; Mastro, Shawna; Boislard, Marie-Aude

    2016-01-01

    Many scholars have called for an increased focus on positive aspects of sexual health and sexuality. Using a longitudinal design with two assessments, we investigated patterns of entitlement to sexual partner pleasure and self-efficacy to achieve sexual pleasure among 295 young men and women aged 17–25 years attending one Australian university. We also tested whether entitlement and efficacy differed by gender, and hypothesized that entitlement and efficacy would be higher in older participants and those with more sexual experience. A sense of entitlement to sexual partner pleasure increased significantly over the year of the study, whereas, on average, there was no change in self-efficacy over time. At Time 1 (T1), young women reported more entitlement than young men. Age was positively associated with T1 entitlement, and experience with a wider range of partnered sexual behaviors was concurrently associated with more entitlement and efficacy and was also associated with increased entitlement to partner pleasure and increased self-efficacy in achieving sexual pleasure at T2 relative to T1. A group with the least amount of sexual experience was particularly low in entitlement and efficacy when compared to groups with a history of coital experience. There was no evidence that any association differed between young men and young women. Limitations of the study include a sample of predominantly middle class, Caucasian students at one university and the possibility that students more interested in sex and relationships, and with more sexual experience, chose to participate. PMID:26797642

  10. Low-cost, low-weight CNG cylinder development. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Mark E.; Melford, K.; Wong, J.; Gambone, L.

    1999-09-01

    This program was established to develop and commercialize new high-strength steel-lined, composite hoop-wrapped compressed natural gas (CNG) cylinders for vehicular applications. As much as 70% of the cost of natural gas vehicles can be related to on-board natural gas storage costs. The cost and weight targets for this program represent significant savings in each characteristic when compared to comparable containers available at the initiation of the program. The program objectives were to optimize specific weight and cost goals, yielding CNG cylinders with dimensions that should, allowing for minor modifications, satisfy several vehicle market segments. The optimization process encompassed material, design, and process improvement. In optimizing the CNG cylinder design, due consideration was given to safety aspects relative to national, international, and vehicle manufacturer cylinder standards and requirements. The report details the design and development effort, encompassing plant modifications, material selection, design issues, tooling development, prototype development, and prototype testing. Extenuating circumstances prevented the immediate commercialization of the cylinder designs, though significant progress was made towards improving the cost and performance of CNG cylinders. A new low-cost fiber was successfully employed while the weight target was met and the cost target was missed by less than seven percent.

  11. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  12. 7 CFR 272.11 - Systematic Alien Verification for Entitlements (SAVE) Program.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Systematic Alien Verification for Entitlements (SAVE... FOR PARTICIPATING STATE AGENCIES § 272.11 Systematic Alien Verification for Entitlements (SAVE... and Naturalization Service (INS), in order to verify the validity of documents provided by aliens...

  13. Near-Net Shape Fabrication Using Low-Cost Titanium Alloy Powders

    Energy Technology Data Exchange (ETDEWEB)

    Dr. David M. Bowden; Dr. William H. Peter

    2012-03-31

    The use of titanium in commercial aircraft production has risen steadily over the last half century. The aerospace industry currently accounts for 58% of the domestic titanium market. The Kroll process, which has been used for over 50 years to produce titanium metal from its mineral form, consumes large quantities of energy. And, methods used to convert the titanium sponge output of the Kroll process into useful mill products also require significant energy resources. These traditional approaches result in product forms that are very expensive, have long lead times of up to a year or more, and require costly operations to fabricate finished parts. Given the increasing role of titanium in commercial aircraft, new titanium technologies are needed to create a more sustainable manufacturing strategy that consumes less energy, requires less material, and significantly reduces material and fabrication costs. A number of emerging processes are under development which could lead to a breakthrough in extraction technology. Several of these processes produce titanium alloy powder as a product. The availability of low-cost titanium powders may in turn enable a more efficient approach to the manufacture of titanium components using powder metallurgical processing. The objective of this project was to define energy-efficient strategies for manufacturing large-scale titanium structures using these low-cost powders as the starting material. Strategies include approaches to powder consolidation to achieve fully dense mill products, and joining technologies such as friction and laser welding to combine those mill products into near net shape (NNS) preforms for machining. The near net shape approach reduces material and machining requirements providing for improved affordability of titanium structures. Energy and cost modeling was used to define those approaches that offer the largest energy savings together with the economic benefits needed to drive implementation. Technical

  14. Historical and projected costs of natural disasters

    Energy Technology Data Exchange (ETDEWEB)

    Engi, D.

    1995-04-01

    Natural disasters cause billions of dollars of damage and thousands Of deaths globally each year. While the magnitude is clear, the exact costs (in damage and fatalities) are difficult to clearly identify. This document reports on the results of a survey of data on the costs associated with significant natural disasters. There is an impressive amount of work and effort going into natural disaster research, mitigation, and relief. However, despite this effort, there are surprisingly few consistent and reliable data available regarding the effects of natural disasters. Even lacking consistent and complete data, it is clear that the damage and fatalities from natural disasters are increasing, both in the United States, and globally. Projections using the available data suggest that, in the United States alone, the costs of natural disasters between 1995 and 2010 will be in the range of $90 billion (94$) and 5000 lives.

  15. Rights as entitlements and rights as claims

    Directory of Open Access Journals (Sweden)

    Azevedo, Marco Antônio Oliveira de

    2010-01-01

    Full Text Available Há pelo menos dois registros diferentes sobre o significado de “direitos”. Segundo um deles, os direitos são relações entre dois termos: uma pessoa e um bem; para o outro, os direitos são relações entre três termos: um indivíduo, uma pessoa e uma ação ou algo. Os registros são diferentes, mas não são totalmente incompatíveis. De acordo com a interpretação de direitos como entitlements, trata-se de direitos morais ou legais, ou seja, as relações de ordem moral ou jurídica das pessoas com bens (de benefícios concedidos a pessoas por uma lei humana, moral ou legal. Como uma espécie de direitos, os direitos humanos são vistos como direitos (entitlements das pessoas ou dos indivíduos a bens essenciais, dos quais podem-se inferir reivindicações (claims contra outras pessoas ou contra governos e representantes. Falamos sobre direitos humanos geralmente desta forma. Mas de acordo com o outro registro, os direitos em sentido próprio têm que ser interpretados como claims. Neste artigo, pretendo apresentar alguns argumentos em favor da vantagem de expor todos os enunciados significativos dos direitos como entitlements em termos explícitos de claims

  16. Costs of mixed low-level waste stabilization options

    International Nuclear Information System (INIS)

    Schwinkendorf, W.E.; Cooley, C.R.

    1998-01-01

    Selection of final waste forms to be used for disposal of DOE's mixed low-level waste (MLLW) depends on the waste form characteristics and total life cycle cost. In this paper the various cost factors associated with production and disposal of the final waste form are discussed and combined to develop life-cycle costs associated with several waste stabilization options. Cost factors used in this paper are based on a series of treatment system studies in which cost and mass balance analyses were performed for several mixed low-level waste treatment systems and various waste stabilization methods including vitrification, grout, phosphate bonded ceramic and polymer. Major cost elements include waste form production, final waste form volume, unit disposal cost, and system availability. Production of grout costs less than the production of a vitrified waste form if each treatment process has equal operating time (availability) each year; however, because of the lower volume of a high temperature slag, certification and handling costs and disposal costs of the final waste form are less. Both the total treatment cost and life cycle costs are higher for a system producing grout than for a system producing high temperature slag, assuming equal system availability. The treatment costs decrease with increasing availability regardless of the waste form produced. If the availability of a system producing grout is sufficiently greater than a system producing slag, then the cost of treatment for the grout system will be less than the cost for the slag system, and the life cycle cost (including disposal) may be less depending on the unit disposal cost. Treatment and disposal costs will determine the return on investment in improved system availability

  17. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  18. The Effects of Reducing the Entitlement Period to Unemployment Insurance Benefits

    NARCIS (Netherlands)

    de Groot, N.; van der Klaauw, B.

    This paper exploits a substantial reform of the Dutch UI law to study the effect of the entitlement period on job finding and subsequent labor market outcomes. Using detailed administrative data covering the full population we find that reducing the entitlement period increases the job finding rate,

  19. 12 CFR 615.5454 - Creation of participant's security entitlement; security interests.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Creation of participant's security entitlement... Procedures for Farm Credit Securities § 615.5454 Creation of participant's security entitlement; security... public money, including without limitation deposits to the Treasury tax and loan accounts, or other...

  20. 12 CFR 1511.4 - Creation of Participant's Security Entitlement; security interests.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Creation of Participant's Security Entitlement... CORPORATION BOOK-ENTRY PROCEDURE § 1511.4 Creation of Participant's Security Entitlement; security interests... to secure deposits of public money, including without limitation deposits to the Treasury tax and...

  1. A Non-Member Spouse's Entitlement To The Member's Pension Interest

    Directory of Open Access Journals (Sweden)

    Motseotsile Clement Marumoagae

    2014-12-01

    Full Text Available It is important that married couples seek legal advice with regard to the assets falling within their joint estate, more particularly their retirement benefits. This article reflects on the entitlement (if any of non-member spouses to their spouses' retirement fund benefits. Pension benefits can be due before, during or after divorce, and parties to the marriage should be aware of their rights with regard to the accruing pension benefits of their spouses. While it is settled law that non-member spouses are entitled to receive a portion of their member spouses' pension benefits (known as "pension interest" immediately on divorce, it is not particularly clear whether non-member spouses are also entitled to receive the same before or sometime after divorce. In this article I provide a contextual understanding of the entitlements (if any which spouses or former spouses of members of pension funds have on such member spouses' retirement benefits. Furthermore, it shown in this article that various divisions of South African High Courts have been inconsistent in how they have approached the issue of the pension interest between divorcing spouses or divorced ex-spouses.

  2. Low Cost, High Efficiency, High Pressure Hydrogen Storage

    Energy Technology Data Exchange (ETDEWEB)

    Mark Leavitt

    2010-03-31

    A technical and design evaluation was carried out to meet DOE hydrogen fuel targets for 2010. These targets consisted of a system gravimetric capacity of 2.0 kWh/kg, a system volumetric capacity of 1.5 kWh/L and a system cost of $4/kWh. In compressed hydrogen storage systems, the vast majority of the weight and volume is associated with the hydrogen storage tank. In order to meet gravimetric targets for compressed hydrogen tanks, 10,000 psi carbon resin composites were used to provide the high strength required as well as low weight. For the 10,000 psi tanks, carbon fiber is the largest portion of their cost. Quantum Technologies is a tier one hydrogen system supplier for automotive companies around the world. Over the course of the program Quantum focused on development of technology to allow the compressed hydrogen storage tank to meet DOE goals. At the start of the program in 2004 Quantum was supplying systems with a specific energy of 1.1-1.6 kWh/kg, a volumetric capacity of 1.3 kWh/L and a cost of $73/kWh. Based on the inequities between DOE targets and Quantum’s then current capabilities, focus was placed first on cost reduction and second on weight reduction. Both of these were to be accomplished without reduction of the fuel system’s performance or reliability. Three distinct areas were investigated; optimization of composite structures, development of “smart tanks” that could monitor health of tank thus allowing for lower design safety factor, and the development of “Cool Fuel” technology to allow higher density gas to be stored, thus allowing smaller/lower pressure tanks that would hold the required fuel supply. The second phase of the project deals with three additional distinct tasks focusing on composite structure optimization, liner optimization, and metal.

  3. Uncertainty contributions to low flow projections in Austria

    Science.gov (United States)

    Parajka, J.; Blaschke, A. P.; Blöschl, G.; Haslinger, K.; Hepp, G.; Laaha, G.; Schöner, W.; Trautvetter, H.; Viglione, A.; Zessner, M.

    2015-11-01

    The main objective of the paper is to understand the contributions to the uncertainty in low flow projections resulting from hydrological model uncertainty and climate projection uncertainty. Model uncertainty is quantified by different parameterizations of a conceptual semi-distributed hydrologic model (TUWmodel) using 11 objective functions in three different decades (1976-1986, 1987-1997, 1998-2008), which allows disentangling the effect of modeling uncertainty and temporal stability of model parameters. Climate projection uncertainty is quantified by four future climate scenarios (ECHAM5-A1B, A2, B1 and HADCM3-A1B) using a delta change approach. The approach is tested for 262 basins in Austria. The results indicate that the seasonality of the low flow regime is an important factor affecting the performance of model calibration in the reference period and the uncertainty of Q95 low flow projections in the future period. In Austria, the calibration uncertainty in terms of Q95 is larger in basins with summer low flow regime than in basins with winter low flow regime. Using different calibration periods may result in a range of up to 60 % in simulated Q95 low flows. The low flow projections show an increase of low flows in the Alps, typically in the range of 10-30 % and a decrease in the south-eastern part of Austria mostly in the range -5 to -20 % for the period 2021-2050 relative the reference period 1976-2008. The change in seasonality varies between scenarios, but there is a tendency for earlier low flows in the Northern Alps and later low flows in Eastern Austria. In 85 % of the basins, the uncertainty in Q95 from model calibration is larger than the uncertainty from different climate scenarios. The total uncertainty of Q95 projections is the largest in basins with winter low flow regime and, in some basins, exceeds 60 %. In basins with summer low flows and the total uncertainty is mostly less than 20 %. While the calibration uncertainty dominates over climate

  4. Making optics appealing in Colombia through low-cost experiments with lasers

    Science.gov (United States)

    Álvarez, Juan R.; Barbosa, Nicolás.; Cotrino, Sergio; Guzmán, David A.; Mahecha, Víctor; Medina, Cristian; Navarrete, M. Cristina; Uribe, Leonardo; Valencia, Alejandra

    2015-10-01

    With the aim of making optics reachable to all audiences, regardless of their age or area of study, we have decided to select, build and test a set of four experiments based on optical phenomena. An important factor in our approach is that the experiments should be used by any non-experienced exhibitor to amaze the audience and to arise in them interest in optics. Ease of setup is therefore desired. Requirements such as durability, repeatability and reduced cost are welcome as well. Taking advantage of the low prices of laser pointers, we focused on experiments which use this nowadays accessible element. The experiments that integrate our selection, costing less than USD75, are: a water stream optical fiber, curved light beams on a honey-water mixture, an optical music transmitter-receiver, and holographic film projections. Among the covered concepts are reflection and refraction of light, color, optical communications, optical interference and modern everyday life's applications. We have presented these setups in activities at our university to a wide range of educational levels, from 12-year old students, passing by last year high school students on a career day event, not leaving behind undergraduate students of any discipline. Moved by the positive response of the audience, we plan to expand its application to continuing education courses and kids' science fairs. We proved that having low-cost setups, useful when teaching science in developing countries, can help to broaden the target audience.

  5. 38 CFR 21.3045 - Entitlement charges.

    Science.gov (United States)

    2010-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION Survivors' and Dependents' Educational Assistance Under 38 U.S.C...) Entitlement charges for elementary and secondary education. (1) When an eligible spouse or surviving spouse is... of the course or courses as a result of being— (A) Ordered, in connection with the Persian Gulf War...

  6. Challenges in Delivering Green Building Projects: Unearthing the Transaction Costs (TCs

    Directory of Open Access Journals (Sweden)

    Queena K. Qian

    2015-03-01

    Full Text Available Delivering green building (GB projects involve some activities that are atypical in comparison with conventional buildings. Such new activities are characterized by uncertainty, and they incur hidden costs that have not been expected nor are they readily appreciated among the stakeholders. This paper develops a typology and chronology to examine the new activities that are associated with transaction costs (TCs in the real estate development process (REDP of green building. Through in-depth interviews with representatives from the major developers in Hong Kong who have experiences in GB practice, this study aims to unearth TCs involved at the critical stages of the REDP. Apart from reconfirming the early project planning stage as the most critical in the consideration of TCs, the study results also identified “extra legal liability risk of the GB product” as the major concern for any GB developer in Hong Kong. The key additional activities that bring significant TCs in developing GB are identified and compared to their traditional counterparts. In turn, project managers not only have to pursue overall cost management whilst winning more business, but they also have to pay particular attention to sustainability in order to minimize hidden societal costs. The study also provides a reference for governments and professionals that will aid in forming policy as well as advance the practice of the GB market by optimizing the societal costs.

  7. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  8. Entitlement attitude in the workplace and its relationship to job satisfaction and organizational commitment

    Directory of Open Access Journals (Sweden)

    Sonya Asenova Dragova-Koleva

    2017-05-01

    Full Text Available Background This article is focused on the entitlement attitude in an organizational context. Its purpose was to examine the relationship of entitlement and its 3 components (active, passive and revengefulness with job satisfaction and organizational commitment. Participants and procedure Two independent studies were conducted to examine the discussed relationships. In study 1 and study 2 there participated respectively 110 and 95 full-time employees from both genders working in public and private organizations. The 30-item Bulgarian version of the Entitlement Questionnaire was used. Job satisfaction measurement included employees’ affective response to their overall job and to various aspects of their job. The three aspects of organizational commitment (affective, instrumental and normative were measured. Results Active entitlement had a positive effect on satisfaction with results, satisfaction with supervisor, pay satisfaction and overall job satisfaction. It was not related to organizational commitment. Passive entitlement had a positive effect on satisfaction with tasks, but it correlated negatively with pay satisfaction. Higher level of passive entitlement predicted instrumental commitment. Revengefulness was negatively related to task satisfaction, satisfaction with supervisor and overall satisfaction, and had a negative effect on affective commitment. Conclusions Different forms of entitlement have a diverse influence on the various aspects of job satisfaction and components of organizational commitment. Active and passive types of entitlement are more adaptive, whereas revengefulness is a maladaptive and dysfunctional attitude.

  9. Novel Low Cost Organic Vapor Jet Printing of Striped High Efficiency Phosphorescent OLEDs for White Lighting

    Energy Technology Data Exchange (ETDEWEB)

    Mike Hack

    2008-12-31

    shaped features. As a result, we believe that this work will lead to the development of a cost-effective manufacturing solution to produce very-high efficiency OLEDs. By comparison to more common ink-jet printing (IJP), OVJP can also produce well-defined patterns without the need to pattern the substrate with ink wells or to dry/anneal the ink. In addition, the material set is not limited by viscosity and solvent solubility. During the program we successfully demonstrated a 6-inch x 6-inch PHOLED lighting panel consisting of fine-featured red, green and blue (R-G-B) stripes (1mm width) using an OVJP deposition system that was designed, procured and installed into UDC's cleanroom as part of this program. This project will significantly accelerate the DOE's ability to meet its 2015 DOE SSL targets of 70-150 lumens/Watt and less than $10 per 1,000 lumens for high CRI lighting index (76-90). Coupled with a low cost manufacturing path through OVJP, we expect that this achievement will enable the DOE to achieve its 2015 performance goals by the year 2013, two years ahead of schedule. As shown by the technical work performed under this program, we believe that OVJP is a very promising technology to produce low cost, high efficacy, color tunable light sources. While we have made significant progress to develop OVJP technology and build a pilot line tool to study basic aspects of the technology and demonstrate a lighting panel prototype, further work needs to be performed before its full potential and commercial viability can be fully assessed.

  10. 24 CFR 81.93 - Creation of Participant's Security Entitlement; security interests.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Creation of Participant's Security... Procedures § 81.93 Creation of Participant's Security Entitlement; security interests. (a) A Participant's... Entitlement of a Participant in favor of the United States to secure deposits of public money, including...

  11. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  12. Manufacturing of Low Cost, Durable Membrane Electrode Assemblies Engineered for Rapid Conditioning

    Energy Technology Data Exchange (ETDEWEB)

    Busby, Colin [W. L. Gore & Associates Inc., Newark, DE (United States)

    2017-05-23

    Over the past 20 years significant progress in membrane-electrode assembly (MEA) technology development for polymer electrolyte fuel cells (PEMFCs) has resulted in the PEMFC technology approaching a commercial reality for transportation applications. However, there remain two primary technical challenges to be addressed in the MEA. First and foremost is meeting the automotive cost targets: Producing a fuel cell stack cost competitive with today’s internal combustion engine. In addition to the material cost, MEA (and other components) and stack assembly production methods must be amenable for use in low cost, high speed, automotive assembly line. One impediment to this latter goal is that stack components must currently go through a long and tedious conditioning procedure before they produce optimal power. This so-called “break-in” can take many hours, and can involve quite complex voltage, temperature and/or pressure steps. These break-in procedures must be simplified and the time required reduced if fuel cells are to become a viable automotive engine. The second challenge is to achieve the durability targets in real-world automotive duty cycle operations. Significant improvements in cost, break-in time, and durability for the key component of fuel cell stacks, MEAs were achieved in this project. Advanced modeling was used to guide design of the new MEA to maximize performance and durability. A new, innovative process and manufacturing approach utilizing direct in-line coating using scalable, cost-competitive, continuous high volume 3-layer rolled-good manufacturing processes was developed and validated by single cell and short stack testing. In addition, the direct coating methods employed were shown to reduce the cost for sacrificial films. Furthermore, Gore has demonstrated a 10 µm reinforced membrane that is used in the new low-cost process and can meet automotive power density and durability targets. Across a wide range of operating conditions, the

  13. Permissive parenting and mental health in college students: Mediating effects of academic entitlement.

    Science.gov (United States)

    Barton, Alison L; Hirsch, Jameson K

    2016-01-01

    Student mental health may suffer due to unreasonable expectations associated with academic entitlement; permissive parenting may be one source of these expectations. The authors examined the role of academic entitlement as a mediator of the relationship between permissive parenting and psychological functioning. Participants were 524 undergraduate students at a single institution (52% female; age range = 18-22). Data collection was completed in May 2011. Cross-sectional design. Participants completed online self-report measures of parenting styles, academic entitlement, stress, depressive symptoms, and well-being. Permissive parenting was associated with greater academic entitlement and, in turn, to more perceived stress and poorer mental health. Mother/father differences were found in some cases. Academic entitlement may partially explain why permissive parenting is detrimentally related to mental health for college students. Implications for academic affairs and counseling include helping students develop an appreciation of the role of self-regulation in college success.

  14. 14 CFR 1274.919 - Cost principles and accounting standards.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost principles and accounting standards... principles and accounting standards. Cost Principles and Accounting Standards July 2002 The expenditure of... Recipient (See clause entitled “Resource Sharing Requirements”) shall be governed by the FAR cost principles...

  15. Solid State Inflation Balloon Active Deorbiter: Scalable Low-Cost Deorbit System for Small Satellites

    Science.gov (United States)

    Huang, Adam

    2016-01-01

    The goal of the Solid State Inflation Balloon Active Deorbiter project is to develop and demonstrate a scalable, simple, reliable, and low-cost active deorbiting system capable of controlling the downrange point of impact for the full-range of small satellites from 1 kg to 180 kg. The key enabling technology being developed is the Solid State Gas Generator (SSGG) chip, generating pure nitrogen gas from sodium azide (NaN3) micro-crystals. Coupled with a metalized nonelastic drag balloon, the complete Solid State Inflation Balloon (SSIB) system is capable of repeated inflation/deflation cycles. The SSGG minimizes size, weight, electrical power, and cost when compared to the current state of the art.

  16. Innovative manufacturing technologies for low-cost, high efficiency PERC-based PV modules

    Energy Technology Data Exchange (ETDEWEB)

    Yelundur, Vijay [Suniva Inc., Norcross, GA (United States)

    2017-04-19

    The goal this project was to accelerate the deployment of innovative solar cell and module technologies that reduce the cost of PERC-based modules to best-in-class. New module integration technology was to be used to reduce the cost and reliance on conventional silver bus bar pastes and enhance cell efficiency. On the cell manufacturing front, the cost of PERC solar cells was to be reduced by introducing advanced metallization approaches to increase cell efficiency. These advancements will be combined with process optimization to target cell efficiencies in the range of 21 to 21.5%. This project will also explore the viability of a bifacial PERC solar cell design to enable cost savings through the use of thin silicon wafers. This project was terminated on 4/30/17 after four months of activity due financial challenges facing the recipient.

  17. 18 CFR 1314.5 - Creation of Participant's Security Entitlement; security interests.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Creation of Participant... FEDERAL RESERVE BANKS § 1314.5 Creation of Participant's Security Entitlement; security interests. (a) A... Security Entitlement of a Participant in favor of the United States to secure deposits of public money...

  18. Prediction of Decommissioning Cost for Kijang Research Reactor Using Power Data of DACCORD

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Yun Jeong; Jin, Hyung Gon; Park, Hee Seong; Park, Seung Kook [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are 3 types of cost estimate that can be used, and each have a different level of accuracy: (i) Order of magnitude estimate: One without detailed engineering data, where an estimate is prepared using scale-up or -down factors and approximate ratios. It is likely that the overall scope of the project has not been well defined. The level of accuracy expected is -30% to +50%. The cost plans to predict referring to abroad examples as decommissioning cost estimation has still not developed and been commercial method for Kijang research reactor. In Kijang research reactor case, overall scope of business isn't yet decided. Then it is supposed to estimate cost with type (i). The IAEA project, entitled 'DACCORD' (Data Analysis and Collection for Costing of Research Reactor Decommissioning) performs decommissioning costing after collecting and analyzing the information related to research reactors around the world for several years. Also decommissioning costing method development tends to increase in the each country. This paper aims to estimate preliminary decommissioning cost based on total decommissioning cost per thermal power rate of research reactor presented in DACCORD project' data which is collected by member state. In this paper, preliminary decommissioning cost is estimated based on total decommissioning cost per thermal power rate of research reactor presented in DACCORD data which is collected by member state. Although there exists a general tendency for costs to increase with increasing thermal power, the limited data available show that decommissioning costs at any given power level can vary widely, with increased variability at higher power levels. Variations in decommissioning cost for the research reactors of the same or similar thermal power are caused by differences in reactor types and design, decommissioning project scopes, country- specific unit workforce costs, and other reactor or project factors. An important factor for the

  19. Efficacy of Low-Cost PC-Based Aviation Training Devices

    Directory of Open Access Journals (Sweden)

    Savern l Reweti

    2017-03-01

    Full Text Available Aim/Purpose: The aim of this study was to explore whether a full cost flight training device (FTD was significantly better for simulator training than a low cost PC-Based Aviation Training Device (PCATD. Background: A quasi-transfer study was undertaken to ascertain whether a Civil Aviation Authority certified Flight Training Device (FTD was more effective at improving pilot proficiency in the performance of a standard VFR traffic pattern (Overhead Rejoin Procedure than a customised low cost PCATD. Methodology: In this quasi-transfer study, a high fidelity FTD rather than an aircraft was used to test both training and transfer tasks. Ninety-three pilots were recruited to participate in the study. Contribution: The use of PCATDs is now well established for pilot training, especially for Instrument Flight Rules (IFR skills training. However, little substantive research has been undertaken to examine their efficacy for VFR training. Findings: There was no evidence of a pre-test/post-test difference in VFR task perfor-mance between participants trained on the PCATD and the FTD, when post tested on the FTD. The use of both PCATD and FTD demonstrated signifi-cant improvements in VFR task performance compared to a control group that received no PCATD or FTD training. Recommendations for Practitioners\t: We discuss the possibility that low cost PCATDs may be a viable alternative for flight schools wishing to use a flight simulator but not able to afford a FTD. Recommendation for Researchers: We discuss the introduction of improved low cost technologies that allow PCATDs to be used more effectively for training in VFR procedures. The development and testing of new technologies requires more research. Impact on Society: Flight training schools operate in a difficult economic environment with continued increases in the cost of aircraft maintenance, compliance costs, and aviation fuel. The increased utilisation of low cost PCATD’s especially for VFR

  20. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  1. Iranian ethylene project

    Energy Technology Data Exchange (ETDEWEB)

    Laugier, J.P.; Handels, J.W.; Overwater, J.; Zielinski, E. [Technip-Coflexip (Iran)

    2002-04-01

    The authors discuss design optimization plans for the world's largest olefins project in Iran. The design has been optimised for both low investment cost and low operating cost. The ways in which this was achieved are outlined under the headings: furnaces, fractionation, hydrogenation, cooling medium and steam system. (UK)

  2. Developing a low-cost open-source CTD for research and outreach

    Science.gov (United States)

    Thaler, A. D.; Sturdivant, K.

    2013-12-01

    Developing a low-cost open-source CTD for research and outreach Andrew David Thaler and Kersey Sturdivant Conductivity, temperature, and depth (CTD). With these three measurements, marine scientists can unlock ocean patterns hidden beneath the waves. The ocean is not uniform, it its filled with swirling eddies, temperature boundaries, layers of high and low salinity, changing densities, and many other physical characteristics. To reveal these patterns, oceanographers use a tool called the CTD. A CTD is found on almost every major research vessel. Rare is the scientific expedition-whether it be coastal work in shallow estuaries or journeys to the deepest ocean trenches-that doesn't begin with the humble CTD cast. The CTD is not cheap. Commercial CTD's start at more the 5,000 and can climb as high as 25,000 or more. We believe that the prohibitive cost of a CTD is an unacceptable barrier to open science. The price tag excludes individuals and groups who lack research grants or significant private funds from conducting oceanographic research. We want to make this tool-the workhorse of oceanographic research-available to anyone with an interest in the oceans. The OpenCTD is a low-cost, open-source CTD suitable for both educators and scientists. The platform is built using readily available parts and is powered by an Arduino-based microcontroller. Our goal is to create a device that is accurate enough to be used for scientific research and can be constructed for less than $200. Source codes, circuit diagrams, and building plans will be freely available. The final instrument will be effective to 200 meters depth. Why 200 meters? For many coastal regions, 200 meters of water depth covers the majority of the ocean that is accessible by small boat. The OpenCTD is targeted to people working in this niche, where entire research projects can be conducted for less than the cost of a commercial CTD. However, the Open CTD is scalable, and anyone with the inclination can adapt our

  3. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  4. A REDUNDANT GNSS-INS LOW-COST UAV NAVIGATION SOLUTION FOR PROFESSIONAL APPLICATIONS

    Directory of Open Access Journals (Sweden)

    J. Navarro

    2015-08-01

    Full Text Available This paper presents the current results for the FP7 GINSEC project. Its goal is to build a pre-commercial prototype of a low-cost, accurate and reliable system for the professional UAV market. Low-cost, in this context, stands for the use of sensors in the most affordable segment of the market, especially MEMS IMUs and GNSS receivers. Reliability applies to the ability of the autopilot to cope with situations where unfavourable GNSS reception conditions or strong electromagnetic fields make the computation of the position and / or attitude of the UAV difficult. Professional and accurate mean that, at least using post-processing techniques as PPP, it will be possible to reach cm-level precisions that open the door to a range of applications demanding high levels of quality in positioning, as precision agriculture or mapping. To achieve such goal, a rigorous sensor error modelling approach, the use of redundant IMUs and a dual-GNSS receiver setup, together with close-coupling techniques and an extended Kalman filter with self-analysis capabilities have been used. Although the project is not yet complete, the results obtained up to now prove the feasibility of the aforementioned goal, especially in those aspects related to position determination. Research work is still undergoing to estimate the heading using a dual-GNNS receiver setup; preliminary results prove the validity of this approach for relatively long baselines, although positive results are expected when these are shorter than 1 m – which is a necessary requisite for small-sized UAVs.

  5. a Redundant Gnss-Ins Low-Cost Uav Navigation Solution for Professional Applications

    Science.gov (United States)

    Navarro, J.; Parés, M. E.; Colomina, I.; Bianchi, G.; Pluchino, S.; Baddour, R.; Consoli, A.; Ayadi, J.; Gameiro, A.; Sekkas, O.; Tsetsos, V.; Gatsos, T.; Navoni, R.

    2015-08-01

    This paper presents the current results for the FP7 GINSEC project. Its goal is to build a pre-commercial prototype of a low-cost, accurate and reliable system for the professional UAV market. Low-cost, in this context, stands for the use of sensors in the most affordable segment of the market, especially MEMS IMUs and GNSS receivers. Reliability applies to the ability of the autopilot to cope with situations where unfavourable GNSS reception conditions or strong electromagnetic fields make the computation of the position and / or attitude of the UAV difficult. Professional and accurate mean that, at least using post-processing techniques as PPP, it will be possible to reach cm-level precisions that open the door to a range of applications demanding high levels of quality in positioning, as precision agriculture or mapping. To achieve such goal, a rigorous sensor error modelling approach, the use of redundant IMUs and a dual-GNSS receiver setup, together with close-coupling techniques and an extended Kalman filter with self-analysis capabilities have been used. Although the project is not yet complete, the results obtained up to now prove the feasibility of the aforementioned goal, especially in those aspects related to position determination. Research work is still undergoing to estimate the heading using a dual-GNNS receiver setup; preliminary results prove the validity of this approach for relatively long baselines, although positive results are expected when these are shorter than 1 m - which is a necessary requisite for small-sized UAVs.

  6. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  7. Low Cost Al-Si Casting Alloy As In-Situ Composite for High Temperature Applications

    Science.gov (United States)

    Lee, Jonathan A.

    2000-01-01

    A new aluminum-silicon (Al-Si) alloy has been successfully developed at NASA- Marshall Space Flight Center (MSFC) that has significant improvement in tensile and fatigue strength at elevated temperatures (500 F-700 F). The alloy offers a number of benefits such as light weight, high hardness, low thermal expansion and high surface wear resistance. In hypereutectic form, this alloy is considered as an in-situ Al-Si composite with tensile strength of about 90% higher than the auto industry 390 alloy at 600 F. This composite is very economically produced by using either conventional permanent steel molds or die casting. The projected material cost is less than $0.90 per pound, and automotive components such as pistons can be cast for high production rate using conventional casting techniques with a low and fully accounted cost. Key Words: Metal matrix composites, In-situ composite, aluminum-silicon alloy, hypereutectic alloy, permanent mold casting, die casting.

  8. Project ECHO: A Telementoring Program for Cervical Cancer Prevention and Treatment in Low-Resource Settings

    Directory of Open Access Journals (Sweden)

    Melissa S. Lopez

    2017-10-01

    Full Text Available Cervical cancer incidence and mortality rates are significantly higher in low- and middle-income countries compared with the United States and other developed countries. This disparity is caused by decreased access to screening, often coupled with low numbers of trained providers offering cancer prevention and treatment services. However, similar disparities are also found in underserved areas of the United States, such as the Texas-Mexico border, where cervical cancer mortality rates are 30% higher than in the rest of Texas. To address these issues, we have adopted the Project ECHO (Extension for Community Healthcare Outcomes program, a low-cost telementoring model previously proven to be successful in increasing local capacity, improving patient management skills, and ultimately improving patient outcomes in rural and underserved areas. We use the Project ECHO model to educate local providers in the management of cervical dysplasia in a low-resource region of Texas and have adapted it to inform strategies for the management of advanced cervical and breast cancer in Latin America and sub-Saharan Africa. This innovative approach, using ECHO, is part of a larger strategy to enhance clinical skills and develop collaborative projects between academic centers and partners in low-resource regions.

  9. The Problem with the Delta Cost Project Database

    Science.gov (United States)

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  10. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Science.gov (United States)

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  11. Low-cost distributed solar-thermal-electric power generation

    Science.gov (United States)

    Der Minassians, Artin; Aschenbach, Konrad H.; Sanders, Seth R.

    2004-01-01

    Due to their high relative cost, solar electric energy systems have yet to be exploited on a widespread basis. It is believed in the energy community that a technology similar to photovoltaic (PV), but offered at about $1/W would lead to widespread deployment at residential and commercial sites. This paper addresses the investigation and feasibility study of a low-cost solar thermal electricity generation technology, suitable for distributed deployment. Specifically, we discuss a system based on nonimaging solar concentrators, integrated with free-piston Stirling engine devices incorporating integrated electric generation. We target concentrator-collector operation at moderate temperatures, in the range of 125°C to 150°C. This temperature is consistent with use of optical concentrators with concentration ratios on the order of 1-2. These low ratio concentrators admit wide angles of radiation acceptance and are thus compatible with no diurnal tracking, and no or only a few seasonal adjustments. Thus, costs and reliability hazards associated with tracking hardware systems are avoided. Further, we note that in the intended application, there is no shortage of incident solar energy, but rather it is the capital cost of the solar-electric system that is most precious. Thus, we outline a strategy for exploiting solar resources in a cost constrained manner. The paper outlines design issues, and a specific design for an appropriately dimensioned free-piston Stirling engine. Only standard low-cost materials and manufacturing methods are required to realize such a machine.

  12. 48 CFR 952.231-70 - Date of incurrence of cost.

    Science.gov (United States)

    2010-10-01

    ... have been negotiated regarding costs incurred prior to the contract effective date: Date of Incurrence of Cost (APR 1984) The Contractor shall be entitled to reimbursement for costs incurred in an amount... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Date of incurrence of cost...

  13. A Low-Cost, Precision Hydrometer for Classroom Use.

    Science.gov (United States)

    Murphy, Michael D.

    1983-01-01

    Describes a low cost hydrometer which can be assembled by students using stock laboratory items with a total retail cost of 17 cents. Includes list of required materials (with supplies) and experimental results on the instrument's accuracy. (JM)

  14. Low-cost safety enhancements for stop-controlled and signalized intersections

    Science.gov (United States)

    2009-05-01

    The purpose of this document is to present information on suggested effective, low-cost intersection countermeasures developed using intersection safety research results and input from an intersection safety expert panel. These low-cost countermeasur...

  15. Testing low cost anaerobic digestion (AD) systems

    Science.gov (United States)

    To evaluate the potential for low technology and low cost digesters for small dairies, BARC and researchers from the University of Maryland installed six modified Taiwanese-model field-scale (FS) digesters near the original dairy manure digester. The FS units receive the same post-separated liquid ...

  16. Low cost monocrystalline silicon sheet fabrication for solar cells by advanced ingot technology

    Science.gov (United States)

    Fiegl, G. F.; Bonora, A. C.

    1980-01-01

    The continuous liquid feed (CLF) Czochralski furnace and the enhanced I.D. slicing technology for the low-cost production of monocrystalline silicon sheets for solar cells are discussed. The incorporation of the CLF system is shown to improve ingot production rate significantly. As demonstrated in actual runs, higher than average solidification rates (75 to 100 mm/hr for 150 mm 1-0-0 crystals) can be achieved, when the system approaches steady-state conditions. The design characteristics of the CLF furnace are detailed, noting that it is capable of precise control of dopant impurity incorporation in the axial direction of the crystal. The crystal add-on cost is computed to be $11.88/sq m, considering a projected 1986 25-slice per cm conversion factor with an 86% crystal growth yield.

  17. Technology for low cost solid rocket boosters.

    Science.gov (United States)

    Ciepluch, C.

    1971-01-01

    A review of low cost large solid rocket motors developed at the Lewis Research Center is given. An estimate is made of the total cost reduction obtainable by incorporating this new technology package into the rocket motor design. The propellant, case material, insulation, nozzle ablatives, and thrust vector control are discussed. The effect of the new technology on motor cost is calculated for a typical expandable 260-in. booster application. Included in the cost analysis is the influence of motor performance variations due to specific impulse and weight changes. It is found for this application that motor costs may be reduced by up to 30% and that the economic attractiveness of future large solid rocket motors will be improved when the new technology is implemented.

  18. Low Cost Processing of Commingled Thermoplastic Composites

    Science.gov (United States)

    Chiasson, Matthew Lee

    A low cost vacuum consolidation process has been investigated for use with commingled thermoplastic matrix composites. In particular, the vacuum consolidation behaviour of commingled polypropylene/glass fibre and commingled nylon/carbon fibre precursors were studied. Laminates were consolidated in a convection oven under vacuum pressure. During processing, the consolidation of the laminate packs was measured by use of non-contact eddy current sensors. The consolidation curves are then used to tune an empirical consolidation model. The overall quality of the resulting laminates is also discussed. Dynamic mechanical analysis, differential scanning calorimetry and mechanical tensile testing were also performed in order to determine the effects of varying processing parameters on the physical and mechanical properties of the laminates. Through this analysis, it was determined that the nylon/carbon fibre blend was not suitable for vacuum consolidation, while the polypropylene/glass fibre blend is a viable option for vacuum consolidation. The ultimate goal of this work is to provide a foundation from which low cost unmanned aerial vehicle (UAV) components can be designed and manufactured from thermoplastic matrix composites using a low cost processing technique as an alternative to traditional thermoset composite materials.

  19. A portable low-cost 3D point cloud acquiring method based on structure light

    Science.gov (United States)

    Gui, Li; Zheng, Shunyi; Huang, Xia; Zhao, Like; Ma, Hao; Ge, Chao; Tang, Qiuxia

    2018-03-01

    A fast and low-cost method of acquiring 3D point cloud data is proposed in this paper, which can solve the problems of lack of texture information and low efficiency of acquiring point cloud data with only one pair of cheap cameras and projector. Firstly, we put forward a scene adaptive design method of random encoding pattern, that is, a coding pattern is projected onto the target surface in order to form texture information, which is favorable for image matching. Subsequently, we design an efficient dense matching algorithm that fits the projected texture. After the optimization of global algorithm and multi-kernel parallel development with the fusion of hardware and software, a fast acquisition system of point-cloud data is accomplished. Through the evaluation of point cloud accuracy, the results show that point cloud acquired by the method proposed in this paper has higher precision. What`s more, the scanning speed meets the demand of dynamic occasion and has better practical application value.

  20. III-V/Active-Silicon Integration for Low-Cost High-Performance Concentrator Photovoltaics

    Energy Technology Data Exchange (ETDEWEB)

    Ringel, Steven [The Ohio State Univ., Columbus, OH (United States); Carlin, John A [The Ohio State Univ., Columbus, OH (United States); Grassman, Tyler [The Ohio State Univ., Columbus, OH (United States)

    2018-04-17

    This FPACE project was motivated by the need to establish the foundational pathway to achieve concentrator solar cell efficiencies greater than 50%. At such an efficiency, DOE modeling projected that a III-V CPV module cost of $0.50/W or better could be achieved. Therefore, the goal of this project was to investigate, develop and advance a III-V/Si mulitjunction (MJ) CPV technology that can simultaneously address the primary cost barrier for III-V MJ solar cells while enabling nearly ideal MJ bandgap profiles that can yield efficiencies in excess of 50% under concentrated sunlight. The proposed methodology was based on use of our recently developed GaAsP metamorphic graded buffer as a pathway to integrate unique GaAsP and Ga-rich GaInP middle and top junctions having bandgaps that are adjustable between 1.45 – 1.65 eV and 1.9 – 2.1 eV, respectively, with an underlying, 1.1 eV active Si subcell/substrate. With this design, the Si can be an active component sub-cell due to the semi-transparent nature of the GaAsP buffer with respect to Si as well as a low-cost alternative substrate that is amenable to scaling with existing Si foundry infrastructure, providing a reduction in materials cost and a low cost path to manufacturing at scale. By backside bonding of a SiGe, a path to exceed 50% efficiency is possible. Throughout the course of this effort, an expansive range of new understanding was achieved that has stimulated worldwide efforts in III-V/Si PV R&D that spanned materials development, metamorphic device optimization, and complete III-V/Si monolithic integration. Highlights include the demonstration of the first ideal GaP/Si interfaces grown by industry-standard MOCVD processes, the first high performance metamorphic tunnel junctions designed for III-V/Si integration, record performance of specific metamorphic sub-cell designs, the first fully integrated GaInP/GaAsP/Si double (1.7 eV/1.1 eV) and triple (1.95 eV/1.5 eV/1.1 eV) junction solar cells, the first

  1. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  2. Nuclear Energy and Renewables: System Effects in Low-carbon Electricity Systems : Method comments to a NEA report

    OpenAIRE

    Söder, Lennart

    2012-01-01

    OECD Nuclear Energy Agency (NEA) released a new report on 29 November 2012. The study recommends that decision-makers should take full electricity system costs into account in energy choices and that such costs should be internalised according to a “generator pays” principle. The study, entitled Nuclear Energy and Renewables: System Effects in Low-carbon Electricity Systems, addresses the increasingly important interactions of variable renewables and dispatchable energy technologies, such as ...

  3. Hybrid” airlines – Generating value between low-cost and traditional

    Directory of Open Access Journals (Sweden)

    Stoenescu Cristina

    2017-07-01

    Full Text Available Over the last years, the rise of low-cost airlines has determined significant changes in the airline industry and has shaped the evolution of the existing business models. Low-cost airlines started by offering basic services at very low prices; traditional airlines responded by equally cutting costs and reinventing the services offered, with an orientation towards braking down the fare and implementing add-ons, in order to become cost-efficient. As traditional airlines developed strategies to become competitive in this new environment, low-cost airlines started focusing on new ways of enhancing passenger experience and attracting new market segments. As a result, the fragmentation of the market segments addressed by low cost carriers and traditional airlines became less obvious and the characteristics of both business models started to blend at all levels (airline operation, distribution channels, loyalty programs, fleet selection. Thus, this new competition became the foundation of the development of a new „hybrid” carrier, between the low-cost and the traditional models. This article investigates the characteristics of the newly created business model, both from a theoretical perspective and by analysing several case studies. A particular attention will be granted to the evolution of the Romanian carrier Blue Air towards the “hybrid” model. The article focuses on determining the position of the “hybrid” airline in a market with carriers situated along both sides of this business model: lower cost vs. “better” experience and raises the question on how value can be generated in this context. Another aspect tackled is the understanding of the new segmentation of the market, as a consequence of the development of the new business model. In order to achieve this purpose, a survey has been conducted, aiming to mark out the travel preferences of the passengers travelling through the Henri Coandă International Airport.

  4. State distributed PV policies: Can low cost (to government) policies have a market impact?

    International Nuclear Information System (INIS)

    Krasko, Vitaliy A.; Doris, Elizabeth

    2013-01-01

    This analysis examines the use of state policy as a tool to support the development of distributed generation photovoltaic (PV) markets. The focus is on low-cost market opening policies instead of various forms of government subsidies aimed at reducing installation costs. The ideas tested in this work are: (1) low-cost market opening policies can be effective in facilitating PV market growth without subsidizing projects, and (2) policies can be made more effective if states and localities stage their enactment in a particular order. The policies selected for evaluation emerge from a policy stacking theory outlined in Doris (2012), NREL/CP-7A30-54801, Golden, CO: National Renewable Energy Laboratory. A cross-section econometric analysis that takes into account the quality of interconnection standards, net metering standards, Renewable Portfolio Standards (RPS), RPS set-asides, and a non-policy determinant (population) explains about 70% of the variation in newly installed PV capacity across states and indicates that all of the selected policies are significant. Nonparametric statistical tests confirm the regression results. Qualitative evidence is also presented indicating that effective policy ordering starts with improving interconnection standards, closely followed by improvements in net metering standards, and eventually strengthened by the enactment of an RPS and set-asides. - Highlights: • Impacts of low cost market opening policies on PV capacity are evaluated. • Impact of a strategic policy enactment sequence is evaluated. • Effective interconnection, net metering, RPS, and set-asides increase PV capacity. • Effective ordering is market preparation, then creation, then expansion policies

  5. Transforming Ordinary Buildings into Smart Buildings via Low-Cost, Self-Powering Wireless Sensors & Sensor Networks

    Energy Technology Data Exchange (ETDEWEB)

    Feng, Philip [Case Western Reserve Univ., Cleveland, OH (United States)

    2017-06-09

    The research objective of this project is to design and demonstrate a low-cost, compact, easy-to-deploy, maintenance-free sensor node technology, and a network of such sensors, which enable the monitoring of multiphysical parameters and can transform today’s ordinary buildings into smart buildings with environmental awareness. We develop the sensor node and network via engineering and integration of existing technologies, including high-efficiency mechanical energy harvesting, and ultralow-power integrated circuits (ICs) for sensing and wireless communication. Through integration and innovative power management via specifically designed low-power control circuits for wireless sensing applications, and tailoring energy-harvesting components to indoor applications, the target products will have smaller volume, higher efficiency, and much lower cost (in both manufacturing and maintenance) than the baseline technology. Our development and commercialization objective is to create prototypes for our target products under the CWRU-Intwine collaboration.

  6. Development and evaluation of a low cost probe-type instrument to measure the equilibrium moisture content of grain

    Science.gov (United States)

    Storage bags are common in Africa, Asia and many other less developed countries therefore a grain probing method is well-suited for moisture content (MC) measurement. A low cost meter was developed as part of a USAID project to reduce the post-harvest loss (PHL). The meter measures the MC of maize a...

  7. Construction of a low cost wind energy generator; Construcao de um gerador de energia eolica de baixo custo

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Jonathan Penha de; Almeida, Silvio Carlos Anibal de [Universidade Federal do Rio de Janeiro (DEM/EP/UFRJ), RJ (Brazil). Escola Politecnica. Dept. de Engenharia Mecanica], Emails: jonathan_penha@poli.ufrj.br, silvioa@gmail.com

    2010-07-01

    This project presents a low cost wind electric power generator constituted of cheap and easy access materials. The necessary materials are presented for it construction and the expected efficiency, having as reference the city of Fernando de Noronha, Brazil. The elaboration of the generator was initially developed as alternative energy source during blackout.

  8. Conceptual costing study for the long-term management of the Port Hope area low-level radioactive wastes

    International Nuclear Information System (INIS)

    1989-12-01

    Comparative conceptual cost estimates for several possible options for the long-term management of the Port Hope area low-level radioactive wastes have been developed. Five potentially applicable concepts were considered in the study: shallow land burial, using either unlined trenches, lined trenches or concrete canisters; engineered storage mounds; above-ground concrete vaults; below-ground concrete vaults; and intermediate-depth caverns using either open stopes or shrinkage mining. The objective was to develop comparative estimates. The differences in costs between concepts reflect the differences in handling methodology or costs of additional engineered barriers around the stored waste. An in situ waste volume of 805 000 m 3 , relatively favorable site conditions, a four-year disposal schedule and a consistent costing basis were assumed for each concept. Limited effort was made to optimize specific facility designs or disposal operations. The projected disposal costs vary from $68/m 3 of waste for shallow land burial in unlined trenches, to $312/m 3 of waste disposal in concrete canisters in trenches. The results of this study are reasonably consistent with previous estimates prepared for the low-level Radioactive Waste Management Office

  9. Recirculating induction accelerator as a low-cost driver for heavy ion fusion

    International Nuclear Information System (INIS)

    Barnard, J.J.; Newton, M.A.; Reginato, L.L.; Sharp, W.M.; Shay, H.D.; Yu, S.S.

    1991-09-01

    As a fusion driver, a heavy ion accelerator offers the advantages of efficient target coupling, high reliability, and long stand-off focusing. While the projected cost of conventional heavy ion fusion (HIF) drivers based on multiple beam induction linacs are quite competitive with other inertial driver options, a driver solution which reduces the cost by a factor of two or more will make the case for HIF truly compelling. The recirculating induction accelerator has the potential of large cost reductions. For this reason, an intensive study of the recirculator concept was performed by a team from LLNL and LBL over the past year. We have constructed a concrete point design example of a 4 MJ driver with a projected efficiency of 35% and projected cost of less than 500 million dollars. A detailed report of our findings during this year of intensive studies has been recently completed. 3 refs., 2 figs., 2 tabs

  10. The environmental monitoring of Cultural Heritage through Low Cost strategies: The frescoes of the crypt of St. Francesco d'Assisi's, Irsina (Basilicata, Southern Italy)

    Science.gov (United States)

    Sileo, Maria; Gizzi, Fabrizio; Masini, Nicola

    2015-04-01

    One of the main tools of assessment and diagnosis used to define appropriate strategies for the preservation of cultural heritage is the environmental monitoring. To achieve an environmental monitoring are needed high costs of purchase and maintenance, high costs of instrumental and for the management of the plants and processing of results. These costs imply that the technologies for environmental monitoring are not as common but their use is limited to the study very famous monuments or sites. To extend the use and dissemination of such technologies to a greater number of monuments, through the project Pro_Cult (Advanced methodological approaches and technologies for Protection and Security of Cultural Heritage) a research aimed at testing low cost technologies has been performed. The aim of the research is to develop low cost monitoring systems, assessing their effectiveness in a comparative way with commercial high cost ones. To this aim an environmental monitoring system using the Arduino system was designed and developed. It is an electronics prototyping platform based on open-source hardware and software flexible and user friendly. This system is connected to sensors for the detection of environmental parameters of non high purchase cost but with respect to the medium potential detection sensors accurately. This low cost system was tested in the framework of a microclimate monitoring project of the crypt of St. Francis of Assisi in Irsina (Southern Italy) enriched by a precious cycle of medieval frescoes. The aim of this research was to compare two monitoring systems, the first, at low cost, using Arduino system, and the second, a standard commercial product for a full yearly cycle and assess the reliability and the results obtained by the two systems. This paper shows the results of the comparative analysis of an entire monitoring yearly cycle in relation to the problems of degradation affecting the paintings of medieval crypt [1]. The obtained results

  11. Single-Phase Hybrid Switched Reluctance Motor for Low-Power Low-Cost Applications

    DEFF Research Database (Denmark)

    Lu, Kaiyuan; Rasmussen, Peter Omand; Jakobsen, Uffe

    2011-01-01

    This paper presents a new single-phase, Hybrid Switched Reluctance (HSR) motor for low-cost, low-power, pump or fan drive systems. Its single-phase configuration allows use of a simple converter to reduce the system cost. Cheap ferrite magnets are used and arranged in a special flux concentration...... manner to increase effectively the torque density and efficiency of this machine. The efficiency of this machine is comparable to the efficiency of a traditional permanent magnet machine in the similar power range. The cogging torque, due to the existence of the permanent magnetic field, is beneficially...

  12. The OPEnSampler: A Low-Cost, Low-Weight, Customizable and Modular Open Source 24-Unit Automatic Water Sampler

    Science.gov (United States)

    Nelke, M.; Selker, J. S.; Udell, C.

    2017-12-01

    Reliable automatic water samplers allow repetitive sampling of various water sources over long periods of time without requiring a researcher on site, reducing human error as well as the monetary and time costs of traveling to the field, particularly when the scale of the sample period is hours or days. The high fixed cost of buying a commercial sampler with little customizability can be a barrier to research requiring repetitive samples, such as the analysis of septic water pre- and post-treatment. DIY automatic samplers proposed in the past sacrifice maximum volume, customizability, or scope of applications, among other features, in exchange for a lower net cost. The purpose of this project was to develop a low-cost, highly customizable, robust water sampler that is capable of sampling many sources of water for various analytes. A lightweight aluminum-extrusion frame was designed and assembled, chosen for its mounting system, strength, and low cost. Water is drawn from two peristaltic pumps through silicone tubing and directed into 24 foil-lined 250mL bags using solenoid valves. A programmable Arduino Uno microcontroller connected to a circuit board communicates with a battery operated real-time clock, initiating sampling stages. Period and volume settings are programmable in-field by the user via serial commands. The OPEnSampler is an open design, allowing the user to decide what components to use and the modular theme of the frame allows fast mounting of new manufactured or 3D printed components. The 24-bag system weighs less than 10kg and the material cost is under $450. Up to 6L of sample water can be drawn at a rate of 100mL/minute in either direction. Faster flowrates are achieved by using more powerful peristaltic pumps. Future design changes could allow a greater maximum volume by filling the unused space with more containers and adding GSM communications to send real time status information.

  13. A complete low cost radon detection system

    International Nuclear Information System (INIS)

    Bayrak, A.; Barlas, E.; Emirhan, E.; Kutlu, Ç.; Ozben, C.S.

    2013-01-01

    Monitoring the 222 Rn activity through the 1200 km long Northern Anatolian fault line, for the purpose of earthquake precursory, requires large number of cost effective radon detectors. We have designed, produced and successfully tested a low cost radon detection system (a radon monitor). In the detector circuit of this monitor, First Sensor PS100-7-CER-2 windowless PIN photodiode and a custom made transempedence/shaping amplifier were used. In order to collect the naturally ionized radon progeny to the surface of the PIN photodiode, a potential of 3500 V was applied between the conductive hemi-spherical shell and the PIN photodiode. In addition to the count rate of the radon progeny, absolute pressure, humidity and temperature were logged during the measurements. A GSM modem was integrated to the system for transferring the measurements from the remote locations to the data process center. - Author-Highlights: • Low cost radon detection. • Integrated GSM modem for early warning of radon anomalies. • Radon detection in environment

  14. Cost-effective treatment of low-risk carcinoma not invading bladder muscle.

    Science.gov (United States)

    Green, David A; Rink, Michael; Cha, Eugene K; Xylinas, Evanguelos; Chughtai, Bilal; Scherr, Douglas S; Shariat, Shahrokh F; Lee, Richard K

    2013-03-01

    Study Type - Therapy (cost effectiveness analysis) Level of Evidence 2a What's known on the subject? and What does the study add? Bladder cancer is one of the costliest malignancies to treat throughout the life of a patient. The most cost-effective management for low-risk non-muscle-invasive bladder cancer is not known. The current study shows that employing cystoscopic office fulguration for low-risk appearing bladder cancer recurrences can materially impact the cost-effectiveness of therapy. In a follow-up protocol where office fulguration is routinely employed for low-risk bladder cancers, peri-operative intravesical chemotherapy may not provide any additional cost-effectiveness benefit. To examine the cost-effectiveness of fulguration vs transurethral resection of bladder tumour (TURBT) with and without perioperative intravesical chemotherapy (PIC) for managing low-risk carcinoma not invading bladder muscle (NMIBC). Low-risk NMIBC carries a low progression rate, lending support to the use of office-based fulguration for small recurrences rather than traditional TURBT. A Markov state transition model was created to simulate treatment of NMIBC with vs without PIC, with recurrence treated by formal TURBT vs treatment with fulguration. Costing data were obtained from the Medicare Resource Based Relative Value Scale. Data regarding the success of PIC were obtained from the peer-reviewed literature, as were corresponding utilities for bladder cancer-related procedures. Sensitivity analyses were performed. At 5-year follow-up, a strategy of fulguration without PIC was the most cost-effective (mean cost-effectiveness = US $654.8/quality-adjusted life year), despite a lower recurrence rate with PIC. Both fulguration strategies dominated each TURBT strategy. Sensitivity analysis showed that fulguration without PIC dominated all other strategies when the recurrence rate after PIC was increased to ≥14.2% per year. Similarly, the cost-effectiveness of TURBT becomes more

  15. PEM Low Cost Endplates. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Martin; Clyens, S.; Steenstrup, F.R.; Christiansen, Jens [Danish Technological Institute. Plastics Technology, Taastrup (Denmark); Yde-Andersen, S. [IRD Fuel Cell A/S, Svendborg (Denmark)

    2013-03-15

    In the project, an endplate for the PEM-type fuel cells has been developed. The initial idea was to use an injection mouldable fibre reinforced polymer to produce the endplate and thereby exploit the opportunities of greater geometrical freedom to reduce weight and material consumption. Different PPS/glass-fibre compounds were produced and tested in order to use the results to optimize the results on the computer through FEM simulations. As it turned out, it was impossible to achieve adequate stiffness for the endplates within the given geometrical limitations. At the relatively high temperatures at which the endplates operate the material simply goes to soft. Material focus shifted to fibre reinforced high strength concrete composite. Test specimens were produced and tested so the results again could be used for FEM-simulations which also accounted for the technical limitations the concrete composite has regarding casting ability. In the process, the way the endplate is mounted was also alternated to better accommodate the properties of the concrete composite. A number of endplates were cast in specially produced moulds in order to map the optimum process parameters, and a final endplate was tested at IRD Fuel Cells A/S. The field test was in many aspects successful. However, the gas sealing and the surface finish can be further improved. The weight may still be an issue for some applications, even though it is lower than the endplate currently used. This issue can be addressed in a future project. The work has resulted in a new endplate design, which makes the stack assembly simpler and with fewer components. The endplates fabrication involves low cost methods, which can be scaled up as demand of fuel cells begin to take off. (Author)

  16. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  17. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  18. Preliminary Tests of a New Low-Cost Photogrammetric System

    Science.gov (United States)

    Santise, M.; Thoeni, K.; Roncella, R.; Sloan, S. W.; Giacomini, A.

    2017-11-01

    This paper presents preliminary tests of a new low-cost photogrammetric system for 4D modelling of large scale areas for civil engineering applications. The system consists of five stand-alone units. Each of the units is composed of a Raspberry Pi 2 Model B (RPi2B) single board computer connected to a PiCamera Module V2 (8 MP) and is powered by a 10 W solar panel. The acquisition of the images is performed automatically using Python scripts and the OpenCV library. Images are recorded at different times during the day and automatically uploaded onto a FTP server from where they can be accessed for processing. Preliminary tests and outcomes of the system are discussed in detail. The focus is on the performance assessment of the low-cost sensor and the quality evaluation of the digital surface models generated by the low-cost photogrammetric systems in the field under real test conditions. Two different test cases were set up in order to calibrate the low-cost photogrammetric system and to assess its performance. First comparisons with a TLS model show a good agreement.

  19. PRELIMINARY TESTS OF A NEW LOW-COST PHOTOGRAMMETRIC SYSTEM

    Directory of Open Access Journals (Sweden)

    M. Santise

    2017-11-01

    Full Text Available This paper presents preliminary tests of a new low-cost photogrammetric system for 4D modelling of large scale areas for civil engineering applications. The system consists of five stand-alone units. Each of the units is composed of a Raspberry Pi 2 Model B (RPi2B single board computer connected to a PiCamera Module V2 (8 MP and is powered by a 10 W solar panel. The acquisition of the images is performed automatically using Python scripts and the OpenCV library. Images are recorded at different times during the day and automatically uploaded onto a FTP server from where they can be accessed for processing. Preliminary tests and outcomes of the system are discussed in detail. The focus is on the performance assessment of the low-cost sensor and the quality evaluation of the digital surface models generated by the low-cost photogrammetric systems in the field under real test conditions. Two different test cases were set up in order to calibrate the low-cost photogrammetric system and to assess its performance. First comparisons with a TLS model show a good agreement.

  20. Low cost thermal solar collector

    International Nuclear Information System (INIS)

    Abugderah, M. M.; Schneider, E. L.; Tontini, M. V.

    2006-01-01

    Solar energy is a good alternative in the economy of the electric energy mainly for the water heating. However, the solar heaters used demand a high initial investment, becoming the warm water from solar energy inaccessible to a large part of the society. Thus, a low cost solar heater was developed, constructed and tested in the chemical engineering department of West Parana State University-Unioeste. This equipment consists of 300 cans, divided in 30 columns of 10 cans each, all painted in black to enhance the obsorption of the solar radiation. The columns are connected to a pipe of pvc of 8 liters with 0.085m of external diameter. The equipment is capable to heat 120 liters of water in temperatures around 60 degree centigrade. The heater is insolated in its inferior part with cardboard and aluminum, covered with a transparent plastic in its superior. The system still counts with a insulated thermal reservoir, which can conserve the water in temperatures adjusted for the night non-solar days domestic use. The advantage of the constructed is it low cost material. The results are given an graphical tabular from showing acceptable efficiencies.(Autho

  1. Low cost nuclear data printer

    International Nuclear Information System (INIS)

    Punnachiya, S.; Aungkultewaraksa, S.; Pengphol, S.

    1988-01-01

    The data printer is essential for nuclear radiation measuring system. A low cost nuclear data printer is developed from an electronic printing calculator. It can transfer the counting data from scaler and printout. The basic concept is that the BCD data is transferred and converted to decimal data sequentially by the interfacing circuit. After the counting time is ended, each digit is transferred to the printing calculator by data bus, digit by digit, until all the data are transferred and printed out. The low cost nuclear data printer consists of a CASIO model HR-8 electronic printing calculator and a printer interface model either NT 2602 or NT 2603 which are designed for printing out 6 digit data from the counter/timer CANBERRA model 1772. In this research the NT 2602 interface is designed only to transfer and printing out data. While the NT 2603 interface is designed to transfer, print out and average data. The NT 2603 can average from 2 to 9 sets of counting data. This data interfacing technique can be applied to work with all scientific instruments having readout as digital display and all kinds of electronic printing calculator

  2. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  3. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; David Duncan; Joan Connolly; Margaret Hinman; Charles Marcinkiewicz; Gary Mecham

    2011-03-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  4. Genetic algorithm for project time-cost optimization in fuzzy environment

    Directory of Open Access Journals (Sweden)

    Khan Md. Ariful Haque

    2012-12-01

    Full Text Available Purpose: The aim of this research is to develop a more realistic approach to solve project time-cost optimization problem under uncertain conditions, with fuzzy time periods. Design/methodology/approach: Deterministic models for time-cost optimization are never efficient considering various uncertainty factors. To make such problems realistic, triangular fuzzy numbers and the concept of a-cut method in fuzzy logic theory are employed to model the problem. Because of NP-hard nature of the project scheduling problem, Genetic Algorithm (GA has been used as a searching tool. Finally, Dev-C++ 4.9.9.2 has been used to code this solver. Findings: The solution has been performed under different combinations of GA parameters and after result analysis optimum values of those parameters have been found for the best solution. Research limitations/implications: For demonstration of the application of the developed algorithm, a project on new product (Pre-paid electric meter, a project under government finance launching has been chosen as a real case. The algorithm is developed under some assumptions. Practical implications: The proposed model leads decision makers to choose the desired solution under different risk levels. Originality/value: Reports reveal that project optimization problems have never been solved under multiple uncertainty conditions. Here, the function has been optimized using Genetic Algorithm search technique, with varied level of risks and fuzzy time periods.

  5. LCX: Proposal for a low-cost commercial transport

    Science.gov (United States)

    Hartman, Troy; Hayatdavoudi, Maziar; Hettinga, Joel; Hooper, Matt; Nguyen, Phong

    1994-01-01

    The LCX has been developed in response to a request for proposal for an aircraft with 153 passenger capacity and a range of 3000 nautical miles. The goals of the LCX are to provide an aircraft which will achieve the stated mission requirements at the lowest cost possible, both for the manufacturer and the operator. Low cost in this request is defined as short and long term profitability. To achieve this objective, modern technologies attributing to low-cost operation without greatly increasing the cost of manufacturing were employed. These technologies include hybrid laminar flow control and the use of developing new manufacturing processes and philosophies. The LCX will provide a competitive alternative to the use of the Airbus A319/320/321 and the Boeing 737 series of aircraft. The LCX has a maximum weight of 150,000 lb. carried by a wing of 1140 ft(exp 2) and an aspect ratio of 10. The selling price of the LCX is 31 million in 1994 US dollars.

  6. New vaccines against otitis media: projected benefits and cost-effectiveness.

    Science.gov (United States)

    O'Brien, Megan A; Prosser, Lisa A; Paradise, Jack L; Ray, G Thomas; Kulldorff, Martin; Kurs-Lasky, Marcia; Hinrichsen, Virginia L; Mehta, Jyotsna; Colborn, D Kathleen; Lieu, Tracy A

    2009-06-01

    New vaccines that offer protection against otitis media caused by nontypeable Haemophilus influenzae and by Moraxella catarrhalis are under development. However, the potential health benefits and economic effects of such candidate vaccines have not been systematically assessed. We created a computerized model to compare the projected benefits and costs of (1) the currently available 7-valent pneumococcal conjugate vaccine, (2) a candidate pneumococcal-nontypeable H influenzae vaccine that has been tested in Europe, (3) a hypothetical pneumococcal-nontypeable H influenzae-Moraxella vaccine, and (4) no vaccination. The clinical probabilities of acute otitis media and of otitis media with effusion were generated from multivariate analyses of data from 2 large health maintenance organizations and from the Pittsburgh Child Development/Otitis Media Study cohort. Other probabilities, costs, and quality-of-life values were derived from published and unpublished sources. The base-case analysis assumed vaccine dose costs of $65 for the 7-valent pneumococcal conjugate vaccine, $100 for the pneumococcal-nontypeable H influenzae vaccine, and $125 for the pneumococcal-nontypeable H influenzae-Moraxella vaccine. With no vaccination, we projected that 13.7 million episodes of acute otitis media would occur annually in US children aged 0 to 4 years, at an annual cost of $3.8 billion. The 7-valent pneumococcal conjugate vaccine was projected to prevent 878,000 acute otitis media episodes, or 6.4% of those that would occur with no vaccination; the corresponding value for the pneumococcal-nontypeable H influenzae vaccine was 3.7 million (27%) and for the pneumococcal-nontypeable H influenzae-Moraxella vaccine was 4.2 million (31%). Using the base-case vaccine costs, pneumococcal-nontypeable H influenzae vaccine use would result in net savings compared with nontypeable 7-valent pneumococcal conjugate use. Conversely, pneumococcal-nontypeable H influenzae-Moraxella vaccine use would not

  7. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  8. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  9. Mixed and Low-Level Waste Treatment Facility Project

    International Nuclear Information System (INIS)

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report documents those studies so the project can continue with an evaluation of programmatic options, system tradeoff studies, and the conceptual design phase of the project. This report, appendix B, comprises the engineering design files for this project study. The engineering design files document each waste steam, its characteristics, and identified treatment strategies

  10. High-precision and low-cost vibration generator for low-frequency calibration system

    Science.gov (United States)

    Li, Rui-Jun; Lei, Ying-Jun; Zhang, Lian-Sheng; Chang, Zhen-Xin; Fan, Kuang-Chao; Cheng, Zhen-Ying; Hu, Peng-Hao

    2018-03-01

    Low-frequency vibration is one of the harmful factors that affect the accuracy of micro-/nano-measuring machines because its amplitude is significantly small and it is very difficult to avoid. In this paper, a low-cost and high-precision vibration generator was developed to calibrate an optical accelerometer, which is self-designed to detect low-frequency vibration. A piezoelectric actuator is used as vibration exciter, a leaf spring made of beryllium copper is used as an elastic component, and a high-resolution, low-thermal-drift eddy current sensor is applied to investigate the vibrator’s performance. Experimental results demonstrate that the vibration generator can achieve steady output displacement with frequency range from 0.6 Hz to 50 Hz, an analytical displacement resolution of 3.1 nm and an acceleration range from 3.72 mm s-2 to 1935.41 mm s-2 with a relative standard deviation less than 1.79%. The effectiveness of the high-precision and low-cost vibration generator was verified by calibrating our optical accelerometer.

  11. Low-cost in vitro fertilization: current insights

    Science.gov (United States)

    Teoh, Pek Joo; Maheshwari, Abha

    2014-01-01

    Despite the development of in vitro fertilization (IVF) more than 30 years ago, the cost of treatment remains high. Furthermore, over the years, more sophisticated technologies and expensive medications have been introduced, making IVF increasingly inaccessible despite the increasing need. Globally, the option to undergo IVF is only available to a privileged few. In recent years, there has been growing interest in exploring strategies to reduce the cost of IVF treatment, which would allow the service to be provided in low-resource settings. In this review, we explore the various ways in which the cost of this treatment can be reduced. PMID:25187741

  12. THE MARKETING MIX FOR LOW COST HEALTHCARE

    OpenAIRE

    Julie George; Dr. Manita D. Shah

    2017-01-01

    The Indian health care industry has a history of dealing with poor doctor-patient ratio, shortage of medical professionals, poor health infrastructure, and low expenditure on healthcare information technology; steep out of pocket spending (OOP), low health insurance coverage, inadequate government spending, poor access to health care facilities and social stigma related to diseases. The unique mindset and ability for frugality has successfully been applied in offering low cost healthcare of u...

  13. Low-cost encapsulation materials for terrestrial solar cell modules

    Science.gov (United States)

    Cuddihy, E. F.; Baum, B.; Willis, P.

    1979-01-01

    The paper presents the findings of material surveys intended to identify low cost materials which could be functional as encapsulants (by 1986) for terrestrial solar cell modules. Economic analyses have indicated that in order to meet the low cost goal of $2.70 per sq m, some or all of the following material technologies must be developed or advanced: (1) UV screening outer covers; (2) elastomeric acrylics; (3) weatherproofing and waterproofing of structural wood and paper products; (4) transparent UV stabilizers for the UV-sensitive transparent pottants; and (5) cost-effective utilization of silicone and fluorocarbon materials.

  14. Thin film CIGS solar cells with a novel low cost process - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Tiwari, A. N.; Romanyuk, Y.

    2010-01-15

    Novel manufacturing routes for efficient and low-cost Cu(In,Ga)Se{sub 2} (called CIGS) thin film solar cells are explored and patented. CIGS has proven its suitability for highly efficient and extremely stable solar cells. The low-cost methods allow impurity free material synthesis, fast large-area deposition, high material utilization and a very short energy payback time with drastically lower manufacturing costs. Two non-vacuum, solution-based approaches are investigated to deposit thin layers of CIGS. The first approach considers incorporation of copper into indium gallium selenide precursor layers by ion-exchange from aqueous or organic solutions. Organic solutions provide faster copper incorporation and do not corrode the metal back contact. Solar cells processed from selenized precursor films exhibit efficiencies of up to 4.1%. The second approach with paste coating of inorganic salt solution results in a solar cell efficiency of 4% (record 6.7%), where further improvements are hindered by the presence of the residual carbon layer. Using alternative organic binders, pre-deposited selenium layers, non-binder recipes helps to avoid the carbon layer although the obtained layers are inhomogeneous and contain impurity phases. A patent for the ion-exchange approach is pending, and the obtained research results on the paste coating approach will be scrutinized during new European FP7 project 'NOVA-CIGS'. (authors)

  15. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  16. Contracting and project strategy to reduce the costs

    International Nuclear Information System (INIS)

    Moum, I.O.; Mosbergvik, O.A.

    1995-01-01

    The Norwegian oil industry has developed and grown to a significant size from the 1970's through the 80's, and numerous large fields were developed under a business environment with high oil prices. The technological challenges were significant, but the expectation of high volumes of produced oil and increasing oil prices, secured the funding for development of these large fields. Today this situation is dramatically changed, and the low oil price alone would make it uneconomic to develop the new fields. In addition to low oil prices, people are now also facing smaller reservoirs, deeper water and more sever environmental conditions. The general competitiveness of the Norwegian Continental Shelf is challenged. Many initiatives have been launched in Norway to support the necessary improvements in business performance. The Norwegian oil and gas industry together with the authorities have through 1994 worked together in the NORSOK initiative to identify means to save 40--50% in cost and time for development of new fields. The industry has developed new technology. The authorities have been addressing the fiscal conditions and general framework for the oil companies, and several areas of improvement have been identified and to some degree implemented by the operators. The most important improvements are probably those that are directly implemented in actual development projects, and Statoil/Kvaerner have together some joint experiences that can illustrate how such ideas successfully can be implemented

  17. Continuous Process for Low-Cost, High-Quality YSZ Powder

    Energy Technology Data Exchange (ETDEWEB)

    Scott L. Swartz; Michael Beachy; Matthew M. Seabaugh

    2006-03-31

    This report describes results obtained by NexTech Materials, Ltd. in a project funded by DOE under the auspices of the Solid-State Energy Conversion Alliance (SECA). The project focused on development of YSZ electrolyte powder synthesis technology that could be ''tailored'' to the process-specific needs of different solid oxide fuel cell (SOFC) designs being developed by SECA's industry teams. The work in the project involved bench-scale processing work aimed at establishing a homogeneous precipitation process for producing YSZ electrolyte powder, scaleup of the process to 20-kilogram batch sizes, and evaluation of the YSZ powder products produced by the process. The developed process involved the steps of: (a) preparation of an aqueous hydrous oxide slurry via coprecipitation; (b) washing of residual salts from the precipitated hydroxide slurry followed by drying; (c) calcination of the dried powder to crystallize the YSZ powder and achieve desired surface area; and (d) milling of the calcined powder to targeted particle size. YSZ powders thus prepared were subjected to a comprehensive set of characterization and performance tests, including particle size distribution and surface area analyses, sintering performance studies, and ionic conductivity measurements. A number of different YSZ powder formulations were established, all of which had desirable performance attributes relative to commercially available YSZ powders. Powder characterization and performance metrics that were established at the onset of the project were met or exceeded. A manufacturing cost analysis was performed, and a manufactured cost of $27/kg was estimated based on this analysis. The analysis also allowed an identification of process refinements that would lead to even lower cost.

  18. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  19. Restricted health care entitlements for child migrants in Europe and Australia

    DEFF Research Database (Denmark)

    Østergaard, Liv Stubbe; Norredam, Marie; Mock-Munoz de Luna, Claire

    2017-01-01

    Background: More than 300 000 asylum seeking children were registered in Europe alone during 2015. In this study, we examined entitlements for health care for these and other migrant children in Europe and Australia in a framework based on United Nations Convention of the Rights of the Child (UNCRC......). Methods: Survey to child health professionals, NGO's and European Ombudspersons for Children in 30 EU/EEA countries and Australia, supplemented by desktop research of official documents. Migrant children were categorised as asylum seekers and irregular/undocumented migrants. Results: Five countries....... Twelve European countries have limited entitlements to health care for asylum seeking children, including Germany that stands out as the country with the most restrictive health care policy for migrant children. In Australia entitlements for health care are restricted for asylum seeking children...

  20. Promoting a low cost energy future in Africa

    African Journals Online (AJOL)

    Robert Kirchner

    confidence of financial institutions and investors in RETs. The publication of a national solar and wind atlas, for example, informs potential investors about suitable areas and reduces the costs for feasibility studies (Renewable. Energy Ventures, 2012). Due to a lack of knowledge and project experience with RETs, obtaining ...

  1. Investment opportunity : the FPL low-cost solar dry kiln

    Science.gov (United States)

    George B. Harpole

    1988-01-01

    Two equations are presented that may be used to estimate a maximum investment limit and working capital requirements for the FPL low-cost solar dry kiln systems. The equations require data for drying cycle time, green lumber cost, and kiln-dried lumber costs. Results are intended to provide a preliminary estimate.

  2. Cost-benefit analysis of copper recovery in remediation projects: A case study from Sweden.

    Science.gov (United States)

    Volchko, Yevheniya; Norrman, Jenny; Rosén, Lars; Karlfeldt Fedje, Karin

    2017-12-15

    Contamination resulting from past industrial activity is a problem throughout the world and many sites are severely contaminated by metals. Advances in research in recent years have resulted in the development of technologies for recovering metal from metal-rich materials within the framework of remediation projects. Using cost-benefit analysis (CBA), and explicitly taking uncertainties into account, this paper evaluates the potential social profitability of copper recovery as part of four remediation alternatives at a Swedish site. One alternative involves delivery of copper-rich ash to a metal production company for refining. The other three alternatives involve metal leaching from materials and sale of the resulting metal sludge for its further processing at a metal production company using metallurgical methods. All the alternatives are evaluated relative to the conventional excavation and disposal method. Metal recovery from the ash, metal sludge sale, and disposal of the contaminated soil and the ash residue at the local landfill site, was found to be the best remediation alternative. However, given the present conditions, its economic potential is low relative to the conventional excavation and disposal method but higher than direct disposal of the copper-rich ash for refining. Volatile copper prices, the high cost of processing equipment, the highly uncertain cost of the metal leaching and washing process, coupled with the substantial project risks, contribute most to the uncertainties in the CBA results for the alternatives involving metal leaching prior to refining. However, investment in processing equipment within the framework of a long-term investment project, production of safe, reusable soil residue, and higher copper prices on the metal market, can make metal recovery technology socially profitable. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Ignoring the sacroiliac joint in chronic low back pain is costly

    Directory of Open Access Journals (Sweden)

    Polly DW

    2016-01-01

    Full Text Available David W Polly,1,2 Daniel Cher3 1Department of Orthopedic Surgery, 2Department of Neurosurgery, University of Minnesota, Minneapolis, MN, 3SI-BONE, Inc., San Jose, CA, USA Background: Increasing evidence supports minimally invasive sacroiliac joint (SIJ fusion as a safe and effective treatment for SIJ dysfunction. Failure to include the SIJ in the diagnostic evaluation of low back pain could result in unnecessary health care expenses. Design: Decision analytic cost model. Methods: A decision analytic model calculating 2-year direct health care costs in patients with chronic low back pain considering lumbar fusion surgery was used. Results: The strategy of including the SIJ in the preoperative diagnostic workup of chronic low back pain saves an expected US$3,100 per patient over 2 years. Cost savings were robust to reasonable ranges for costs and probabilities, such as the probability of diagnosis and the probability of successful surgical treatment. Conclusion: Including the SIJ as part of the diagnostic strategy in preoperative patients with chronic low back pain is likely to be cost saving in the short term. Keywords: chronic low back pain, lumbar fusion, sacroiliac joint pain, sacroiliac joint fusion, healthcare costs, decision modeling

  4. CRADA with United Solar Technologies and Pacific Northwest Laboratory (PNL-021): Thin film materialsfor low-cost high performance solar concentrators

    Science.gov (United States)

    Martin, P. M.; Affinito, J. D.; Gross, M. E.; Bennett, W. D.

    1995-03-01

    The objectives of this project were to develop and evaluate promising low-cost dielectric and polymer-protected thin-film reflective metal coatings to be applied to preformed continuously-curved solar reflector panels to enhance their solar reflectance, and to demonstrate protected solar reflective coatings on preformed solar concentrator panels. The opportunity for this project arose from a search by United Solar Technologies (UST) for organizations and facilities capable of applying reflective coatings to large preformed panels. PNL was identified as being uniquely qualified to participate in this collaborative project.

  5. Design of low cost glaucoma screening

    NARCIS (Netherlands)

    Niessen, A. G.; Langerhorst, C. T.; Geijssen, H. C.; Greve, E. L.

    1997-01-01

    In 1991 the Netherlands Glaucoma Patient Association organized a glaucoma screening survey. This survey was designed to evaluate the effectiveness of a low cost screening setting. During a screening period of 8 days, 1259 subjects over the age of 49 years were examined by a team of

  6. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  7. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  8. 78 FR 46418 - Proposed Information Collection (Obligation To Report Factors Affecting Entitlement) Activity...

    Science.gov (United States)

    2013-07-31

    ... (Obligation To Report Factors Affecting Entitlement) Activity; Comment Request AGENCY: Veterans Benefits... use of other forms of information technology. Title: Obligation to Report Factors Affecting... entitlement factors. Individual factors such as income, marital status, and the beneficiary's number of...

  9. Between availability and entitlement: The Constitution, Grootboom ...

    African Journals Online (AJOL)

    Between availability and entitlement: The Constitution, Grootboom and the right to food. Danie Brand. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians ...

  10. Tax treaty entitlement issues concerning dual residents

    NARCIS (Netherlands)

    Sanghavi, D.

    2014-01-01

    The question whether a dual resident taxpayer is entitled to tax treaties concluded by each residence state with a third state has been controversial. Since 2008, the Organisation for Economic Co-operation and Development (OECD) Commentary on Article 4(1) of the OECD Model states that such a

  11. Tracking Clouds with low cost GNSS chips aided by the Arduino platform

    Science.gov (United States)

    Hameed, Saji; Realini, Eugenio; Ishida, Shinya

    2016-04-01

    The Global Navigation Satellite System (GNSS) is a constellation of satellites that is used to provide geo-positioning services. Besides this application, the GNSS system is important for a wide range of scientific and civilian applications. For example, GNSS systems are routinely used in civilian applications such as surveying and scientific applications such as the study of crustal deformation. Another important scientific application of GNSS system is in meteorological research. Here it is mainly used to determine the total water vapour content of the troposphere, hereafter Precipitable Water Vapor (PWV). However, both GNSS receivers and software have prohibitively high price due to a variety of reasons. To overcome this somewhat artificial barrier we are exploring the use of low-cost GNSS receivers along with open source GNSS software for scientific research, in particular for GNSS meteorology research. To achieve this aim, we have developed a custom Arduino compatible data logging board that is able to operate together with a specific low-cost single frequency GNSS receiver chip from NVS Technologies AG. We have also developed an open-source software bundle that includes a new Arduino core for the Atmel324p chip, which is the main processor used in our custom logger. We have also developed software code that enables data collection, logging and parsing of the GNSS data stream. Additionally we have comprehensively evaluated the low power characteristics of the GNSS receiver and logger boards. Currently we are exploring the use of several openly source or free to use for research software to map GNSS delays to PWV. These include the open source goGPS (http://www.gogps-project.org/) and gLAB (http://gage.upc.edu/gLAB) and the openly available GAMIT software from Massachusetts Institute of Technology (MIT). We note that all the firmware and software developed as part of this project is available on an open source license.

  12. Cost-analysis of an oral health outreach program for preschool children in a low socioeconomic multicultural area in Sweden

    DEFF Research Database (Denmark)

    Wennhall, Inger; Norlund, Anders; Matsson, Lars

    2010-01-01

    to a comprehensive oral health outreach project for preschool children conducted in a low-socioeconomic multi-cultural urban area. The outcome was compared with historical controls from the same area with conventional dental care. The cost per minute for the various dental professions was added to the cost......The aim was to calculate the total and the net costs per child included in a 3-year caries preventive program for preschool children and to make estimates of expected lowest and highest costs in a sensitivity analysis. The direct costs for prevention and dental care were applied retrospectively...... of materials, rental facilities and equipment based on accounting data. The cost for fillings was extracted from a specified per diem list. Overhead costs were assumed to correspond to 50% of salaries and all costs were calculated as net present value per participating child in the program and expressed...

  13. Directions of organisational and low-cost energy saving of engineering enterprises

    Directory of Open Access Journals (Sweden)

    Dzhedzhula Viacheslav V.

    2014-01-01

    Full Text Available The article analyses directions of energy saving of industrial enterprises. Taking into account the tendency to continuous growth of cost of energy resources, introduction of measures that would allow reduction of energy consumption of enterprises is an urgent task. One of the most important obstacles in the process of introduction of energy efficient solutions are fund limits and low awareness of owners and managers of industrial enterprises. The article offers a new classification of energy saving measures: apart from traditional expense and organisation measures it introduces the low-cost measures notion. It offers to consider low-cost those measures that are realised by the enterprise by means of own funds, moreover, their repayment term is not more than one year. It offers analytical expression for identification of annual funds saving from introduction of low-cost measures. It considers the process of identification of saving of funds from introduction of some of the main low-cost measures in detail: replacement of lighting units, balancing of ventilation networks and elimination of water leakages from pipelines and water supply equipment. Based on the analysis of bibliography information the article provides a list of main measures on energy saving, which could be referred to the low-cost ones. The proposed approaches would allow paying more attention to practical aspects of realisation of the concept of energy saving in the industry.

  14. Comparison of MEA capture cost for low CO{sub 2} emissions sources in Australia

    Energy Technology Data Exchange (ETDEWEB)

    Ho, M.T.; Allinson, G.W.; Wiley, D.E. [University of New South Wales, Sydney, NSW (Australia). School of Chemical Engineering

    2011-01-15

    This paper estimates the cost of CO{sub 2} capture for three Australian industrial emission sources: iron and steel production, oil refineries and cement manufacturing. It also compares the estimated capture costs with those of post-combustion capture from a pulverised black coal power plant. The cost of capture in 2008 using MEA solvent absorption technology ranges from less than A$60 per tonne CO{sub 2} avoided for the iron and steel production to over A$70 per tonne CO{sub 2} avoided for cement manufacture and over A$100 per tonne CO{sub 2} avoided for oil refineries. The costs of capture for the iron and steel and cement industries are comparable to or less than that for post-combustion capture from a pulverised black coal power plant. This paper also investigates costs for converting low partial pressure CO{sub 2} streams from iron and steel production to a more concentrated stream using pressurisation and the water-gas shift reaction. In those cases, the costs were found to be similar to or less than the cost estimates without conversion. The analyses in this paper also show that estimated costs are highly dependent on the characteristics of the industrial emission source, the assumptions related to the type and price of energy used by the capture facilities and the economic parameters of the project such as the discount rate and capital costs.

  15. Alcoholism treatment and medical care costs from Project MATCH.

    Science.gov (United States)

    Holder, H D; Cisler, R A; Longabaugh, R; Stout, R L; Treno, A J; Zweben, A

    2000-07-01

    This paper examines the costs of medical care prior to and following initiation of alcoholism treatment as part of a study of patient matching to treatment modality. Longitudinal study with pre- and post-treatment initiation. The total medical care costs for inpatient and outpatient treatment for patients participating over a span of 3 years post-treatment. Three treatment sites at two of the nine Project MATCH locations (Milwaukee, WI and Providence, RI). Two hundred and seventy-nine patients. Patients were randomly assigned to one of three treatment modalities: a 12-session cognitive behavioral therapy (CBT), a four-session motivational enhancement therapy (MET) or a 12-session Twelve-Step facilitation (TSF) treatment over 12 weeks. Total medical care costs declined from pre- to post-treatment overall and for each modality. Matching effects independent of clinical prognosis showed that MET has potential for medical-care cost-savings. However, patients with poor prognostic characteristics (alcohol dependence, psychiatric severity and/or social network support for drinking) have better cost-savings potential with CBT and/or TSF. Matching variables have significant importance in increasing the potential for medical-care cost-reductions following alcoholism treatment.

  16. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  17. A low cost liquid metal reactor design

    International Nuclear Information System (INIS)

    Arnold, W.H.; Anderson, C.A.; Mangus, J.D.

    1984-01-01

    A new, compact Liquid Metal Reactor (LMR) plant arrangement designed by Westinghouse, featuring factory-fabricated modules and an integrated fuel cycle facility, has made it possible to project a commercially competitive LMR plant for the near future. This innovative liquid metal-cooled plant design will allow a combination of capital, fuel, operation and maintenance costs that could be lower than today's fossil-fueled or light water reactor plant costs, and incorporate features which enhance public safety even beyond current high standards. Following early core loadings, the plant feeds only on depleted uranium. No shipment of fuel is required. And the plant can be tailored to produce enough plutonium to meet its need or to provide fuel for other nuclear plants

  18. Low cost submarine robot

    Directory of Open Access Journals (Sweden)

    Ponlachart Chotikarn

    2010-10-01

    Full Text Available A submarine robot is a semi-autonomous submarine robot used mainly for marine environmental research. We aim todevelop a low cost, semi-autonomous submarine robot which is able to travel underwater. The robot’s structure was designedand patented using a novel idea of the diving system employing a volume adjustment mechanism to vary the robot’s density.A light weight, flexibility and small structure provided by PVC can be used to construct the torpedo-liked shape robot.Hydraulic seal and O-ring rubbers are used to prevent water leaking. This robot is controlled by a wired communicationsystem.

  19. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  20. Cost reductions in nickel-hydrogen battery

    Science.gov (United States)

    Beauchamp, Richard L.; Sindorf, Jack F.

    1987-01-01

    Significant progress was made toward the development of a commercially marketable hydrogen nickel oxide battery. The costs projected for this battery are remarkably low when one considers where the learning curve is for commercialization of this system. Further developmental efforts on this project are warranted as the H2/NiO battery is already cost competitive with other battery systems.

  1. Permissive Parenting and Mental Health in College Students: Mediating Effects of Academic Entitlement

    Science.gov (United States)

    Barton, Alison L.; Hirsch, Jameson K.

    2016-01-01

    Objective: Student mental health may suffer due to unreasonable expectations associated with academic entitlement; permissive parenting may be one source of these expectations. The authors examined the role of academic entitlement as a mediator of the relationship between permissive parenting and psychological functioning. Participants:…

  2. AN ENHANCED MODEL TO ESTIMATE EFFORT, PERFORMANCE AND COST OF THE SOFTWARE PROJECTS

    Directory of Open Access Journals (Sweden)

    M. Pauline

    2013-04-01

    Full Text Available The Authors have proposed a model that first captures the fundamentals of software metrics in the phase 1 consisting of three primitive primary software engineering metrics; they are person-months (PM, function-points (FP, and lines of code (LOC. The phase 2 consists of the proposed function point which is obtained by grouping the adjustment factors to simplify the process of adjustment and to ensure more consistency in the adjustments. In the proposed method fuzzy logic is used for quantifying the quality of requirements and is added as one of the adjustment factor, thus a fuzzy based approach for the Enhanced General System Characteristics to Estimate Effort of the Software Projects using productivity has been obtained. The phase 3 takes the calculated function point from our work and is given as input to the static single variable model (i.e. to the Intermediate COCOMO and COCOMO II for cost estimation. The Authors have tailored the cost factors in intermediate COCOMO and both; cost and scale factors are tailored in COCOMO II to suite to the individual development environment, which is very important for the accuracy of the cost estimates. The software performance indicators are project duration, schedule predictability, requirements completion ratio and post-release defect density, are also measured for the software projects in my work. A comparative study for effort, performance measurement and cost estimation of the software project is done between the existing model and the authors proposed work. Thus our work analyzes the interaction¬al process through which the estimation tasks were collectively accomplished.

  3. 20 CFR 725.228 - Effect of conviction of felonious and intentional homicide on entitlement to benefits.

    Science.gov (United States)

    2010-04-01

    ... intentional homicide on entitlement to benefits. 725.228 Section 725.228 Employees' Benefits EMPLOYMENT... intentional homicide on entitlement to benefits. An individual who has been convicted of the felonious and intentional homicide of a miner or other beneficiary shall not be entitled to receive any benefits payable...

  4. Low Cost, High-Throughput 3-D Pulmonary Imager Using Hyperpolarized Contrast Agents and Low-Field MRI

    Science.gov (United States)

    2017-10-01

    greater gas polarizations and production amounts/ throughputs- benefiting in particular from the advent of com- pact, high-power, relatively low- cost ...Award Number: W81XWH-15-1-0271 TITLE: Low- Cost , High-Throughput 3-D Pulmonary Imager Using Hyperpolarized Contrast Agents and Low-Field MRI...DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The views, opinions and/or findings contained in this report are those of the

  5. Efficiency and cost effectiveness of retrofitting ventilation in low-rise housing

    International Nuclear Information System (INIS)

    Bowser, D.; Fugler, D.

    2000-01-01

    Effective and inexpensive ventilation systems that can be retrofitted to existing low-rise housing to improve indoor air quality in existing housing stock is discussed. In a project by CMHC ten retrofit ventilation systems in single family residential buildings were tested in an effort to identify homes with specific indoor air quality concerns and to evaluate the performance of these retrofit systems by monitoring air quality before and after installation. Measurements were taken over a two-to-three day period with normal occupancy. In one case radon contamination was also measured directly before and after the retrofit. Cost estimates were based on capital, operating and maintenance expenses. This paper describes the results of three sample case studies. One of these involved a home with high concentration of radon gas. The recommended solution was fan-assisted removal of soil gases as the only way to ensure substantial reductions in concentration. Cost of the system was $2,450, plus $79 annual operating expenses. The second case involved a basement apartment with odour and moisture build-up. To solve the problem, an exhaust-only ventilation system with multiple pick-up points was installed at a cost of $750. Annual operating costs are estimated at $171. The third case study described a dwelling with windows and exhaust ducts showing condensation and mold on the bathroom ceiling. Balanced mechanical ventilation via an HRV was installed to exhaust the moist air from the house and to supply fresh dry air. In this case cost of the system was $1,345 installed, plus annual operating costs of $117. It was stressed that different houses have different requirements. Therefore it is important to be fully aware of the amount of natural ventilation a house has, prior to determining whether the solution demands additional ventilation requirements or simply redistribution. 1 ref., 3 figs

  6. Sliver Solar Cells: High-Efficiency, Low-Cost PV Technology

    Directory of Open Access Journals (Sweden)

    Evan Franklin

    2007-01-01

    Full Text Available Sliver cells are thin, single-crystal silicon solar cells fabricated using standard fabrication technology. Sliver modules, composed of several thousand individual Sliver cells, can be efficient, low-cost, bifacial, transparent, flexible, shadow tolerant, and lightweight. Compared with current PV technology, mature Sliver technology will need 10% of the pure silicon and fewer than 5% of the wafer starts per MW of factory output. This paper deals with two distinct challenges related to Sliver cell and Sliver module production: providing a mature and robust Sliver cell fabrication method which produces a high yield of highly efficient Sliver cells, and which is suitable for transfer to industry; and, handling, electrically interconnecting, and encapsulating billions of sliver cells at low cost. Sliver cells with efficiencies of 20% have been fabricated at ANU using a reliable, optimised processing sequence, while low-cost encapsulation methods have been demonstrated using a submodule technique.

  7. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  8. Monitoring and evaluation of Blyth Offshore Wind Farm. Projected operation and maintenance costs of UK offshore wind farms based on the experience at Blyth

    Energy Technology Data Exchange (ETDEWEB)

    Greig, E.

    2004-07-01

    This is the fifth of seven reports in this series on specific aspects of the monitoring and evaluation of the Blyth offshore wind farm project. The report assesses the operation and maintenance (O and M) costs for the wind farm in its first full year of operation, and extrapolates these costs to give indicative costs for larger projects. It identifies both planned regular costs and unplanned site maintenance costs; some costs can be attributed to 'troubleshooting' during installation and would not be expected in future years. The Blyth wind farm, the first in the UK, consists of two 2 MW wind turbines installed approximately 1 km from the coast in water about 6 m deep at low tide. The site is exposed to the full impact of the North Sea weather, breaking waves and a significant tidal range (about 5 m). Location, boat availability, weather and insurance are identified as the key factors affecting O and M costs for future offshore wind farms in the UK.

  9. CDM pilot project to stimulate market for family-hydro for low-income households

    International Nuclear Information System (INIS)

    2004-01-01

    Over 100,000 low-income households living in rural, rice-farming regions of Vietnam and China rely upon family-hydro (between 100 and 200W) as the only affordable means of obtaining electricity. These systems are used for domestic lighting, radio and, in some cases, televisions. The units are small, cheap and are usually installed and owned by a single family. Funding from the CDM could be utilised in order to reduce the cost of good quality equipment to provide low-income households living in isolated off-grid locations with an affordable and sustainable electricity supply which can meet their needs for lighting, educational, productive and recreational uses. Therefore research was needed to determine the level of carbon emission reductions resulting from their use. The successful acceptance by the Prototype Carbon Fund (PCF) of the methodology of establishing the benchmark developed during this project could then be used as a precedent by other project developers in the future, thus being of long-term support to the emerging family-hydro industry. (author)

  10. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    International Nuclear Information System (INIS)

    Shonder, John A.; Hughes, Patrick; Atkin, Erica

    2006-01-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  11. Automated packaging platform for low-cost high-performance optical components manufacturing

    Science.gov (United States)

    Ku, Robert T.

    2004-05-01

    Delivering high performance integrated optical components at low cost is critical to the continuing recovery and growth of the optical communications industry. In today's market, network equipment vendors need to provide their customers with new solutions that reduce operating expenses and enable new revenue generating IP services. They must depend on the availability of highly integrated optical modules exhibiting high performance, small package size, low power consumption, and most importantly, low cost. The cost of typical optical system hardware is dominated by linecards that are in turn cost-dominated by transmitters and receivers or transceivers and transponders. Cost effective packaging of optical components in these small size modules is becoming the biggest challenge to be addressed. For many traditional component suppliers in our industry, the combination of small size, high performance, and low cost appears to be in conflict and not feasible with conventional product design concepts and labor intensive manual assembly and test. With the advent of photonic integration, there are a variety of materials, optics, substrates, active/passive devices, and mechanical/RF piece parts to manage in manufacturing to achieve high performance at low cost. The use of automation has been demonstrated to surpass manual operation in cost (even with very low labor cost) as well as product uniformity and quality. In this paper, we will discuss the value of using an automated packaging platform.for the assembly and test of high performance active components, such as 2.5Gb/s and 10 Gb/s sources and receivers. Low cost, high performance manufacturing can best be achieved by leveraging a flexible packaging platform to address a multitude of laser and detector devices, integration of electronics and handle various package bodies and fiber configurations. This paper describes the operation and results of working robotic assemblers in the manufacture of a Laser Optical Subassembly

  12. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  13. Low Cost Vision Based Personal Mobile Mapping System

    Science.gov (United States)

    Amami, M. M.; Smith, M. J.; Kokkas, N.

    2014-03-01

    Mobile mapping systems (MMS) can be used for several purposes, such as transportation, highway infrastructure mapping and GIS data collecting. However, the acceptance of these systems is not wide spread and their use is still limited due the high cost and dependency on the Global Navigation Satellite System (GNSS). A low cost vision based personal MMS has been produced with an aim to overcome these limitations. The system has been designed to depend mainly on cameras and use of low cost GNSS and inertial sensors to provide a bundle adjustment solution with initial values. The system has the potential to be used indoor and outdoor. The system has been tested indoors and outdoors with different GPS coverage, surrounded features, and narrow and curvy paths. Tests show that the system is able to work in such environments providing 3D coordinates of better than 10 cm accuracy.

  14. Low Cost Vision Based Personal Mobile Mapping System

    Directory of Open Access Journals (Sweden)

    M. M. Amami

    2014-03-01

    Full Text Available Mobile mapping systems (MMS can be used for several purposes, such as transportation, highway infrastructure mapping and GIS data collecting. However, the acceptance of these systems is not wide spread and their use is still limited due the high cost and dependency on the Global Navigation Satellite System (GNSS. A low cost vision based personal MMS has been produced with an aim to overcome these limitations. The system has been designed to depend mainly on cameras and use of low cost GNSS and inertial sensors to provide a bundle adjustment solution with initial values. The system has the potential to be used indoor and outdoor. The system has been tested indoors and outdoors with different GPS coverage, surrounded features, and narrow and curvy paths. Tests show that the system is able to work in such environments providing 3D coordinates of better than 10 cm accuracy.

  15. Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Abraham [Natel Energy, Inc., Alameda, CA (United States); Schneider, Gia [Natel Energy, Inc., Alameda, CA (United States); McKinstry, Katherine [Natel Energy, Inc., Alameda, CA (United States); Harwood, Meghan [Natel Energy, Inc., Alameda, CA (United States)

    2017-03-14

    Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or above tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first

  16. 20 CFR 404.337 - When does my entitlement to widow's and widower's benefits start and end?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false When does my entitlement to widow's and widower's benefits start and end? 404.337 Section 404.337 Employees' Benefits SOCIAL SECURITY... does my entitlement to widow's and widower's benefits start and end? (a) We will find you entitled to...

  17. Designing a Low-Cost Multifunctional Infant Incubator.

    Science.gov (United States)

    Tran, Kevin; Gibson, Aaron; Wong, Don; Tilahun, Dagmawi; Selock, Nicholas; Good, Theresa; Ram, Geetha; Tolosa, Leah; Tolosa, Michael; Kostov, Yordan; Woo, Hyung Chul; Frizzell, Michael; Fulda, Victor; Gopinath, Ramya; Prasad, J Shashidhara; Sudarshan, Hanumappa; Venkatesan, Arunkumar; Kumar, V Sashi; Shylaja, N; Rao, Govind

    2014-06-01

    Every year, an unacceptably large number of infant deaths occur in developing nations, with premature birth and asphyxia being two of the leading causes. A well-regulated thermal environment is critical for neonatal survival. Advanced incubators currently exist, but they are far too expensive to meet the needs of developing nations. We are developing a thermodynamically advanced low-cost incubator suitable for operation in a low-resource environment. Our design features three innovations: (1) a disposable baby chamber to reduce infant mortality due to nosocomial infections, (2) a passive cooling mechanism using low-cost heat pipes and evaporative cooling from locally found clay pots, and (3) insulated panels and a thermal bank consisting of water that effectively preserve and store heat. We developed a prototype incubator and visited and presented our design to our partnership hospital site in Mysore, India. After obtaining feedback, we have determined realistic, nontrivial design requirements and constraints in order to develop a new prototype incubator for clinical trials in hospitals in India. © 2014 Society for Laboratory Automation and Screening.

  18. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  19. Analysis on Occupants’ Satisfaction for Safety Performance Assessment in Low Cost Housing

    Directory of Open Access Journals (Sweden)

    Husin Husrul Nizam

    2014-01-01

    Full Text Available The delivery performance of the low cost housing is questioned since the occupants are prone towards safety hazards in the housing complex, such as structural instability and falling building fragments. Without defining the occupants’ requirements for the development of low cost housing, the prevailing safety factors are hard to be determined. This paper explores the rationale of safety performance assessment in the low cost housing by considering the occupants’ participation to achieve a better safety provision during occupancy period. Questionnaire survey was distributed to 380 occupants of the low cost housing in Kuala Lumpur and Selangor, Malaysia. The result shows that 80.8% of the respondents had expressed their dissatisfaction with the safety performance of the lift. By referring to the mode of ranking level, the most significant aspect rated by the respondents is Building Safety Features, with 51.6% respondents. The attained aspects can be fundamental parameters which can be considered in the future development of low cost housing.

  20. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  1. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  2. Waste Management Facilities cost information for low-level waste

    Energy Technology Data Exchange (ETDEWEB)

    Shropshire, D.; Sherick, M.; Biadgi, C.

    1995-06-01

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing low-level waste. The report`s information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.

  3. AUTOMATED LOW-COST PHOTOGRAMMETRY FOR FLEXIBLE STRUCTURE MONITORING

    Directory of Open Access Journals (Sweden)

    C. H. Wang

    2012-07-01

    Full Text Available Structural monitoring requires instruments which can provide high precision and accuracy, reliable measurements at good temporal resolution and rapid processing speeds. Long-term campaigns and flexible structures are regarded as two of the most challenging subjects in monitoring engineering structures. Long-term monitoring in civil engineering is generally considered to be labourintensive and financially expensive and it can take significant effort to arrange the necessary human resources, transportation and equipment maintenance. When dealing with flexible structure monitoring, it is of paramount importance that any monitoring equipment used is able to carry out rapid sampling. Low cost, automated, photogrammetric techniques therefore have the potential to become routinely viable for monitoring non-rigid structures. This research aims to provide a photogrammetric solution for long-term flexible structural monitoring purposes. The automated approach was achieved using low-cost imaging devices (mobile phones to replace traditional image acquisition stations and substantially reduce the equipment costs. A self-programmed software package was developed to deal with the hardware-software integration and system operation. In order to evaluate the performance of this low-cost monitoring system, a shaking table experiment was undertaken. Different network configurations and target sizes were used to determine the best configuration. A large quantity of image data was captured by four DSLR cameras and four mobile phone cameras respectively. These image data were processed using photogrammetric techniques to calculate the final results for the system evaluation.

  4. Construction of a low-cost luximeter

    Science.gov (United States)

    Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.

    2016-04-01

    This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.

  5. Open source software and low cost sensors for teaching UAV science

    Science.gov (United States)

    Kefauver, S. C.; Sanchez-Bragado, R.; El-Haddad, G.; Araus, J. L.

    2016-12-01

    Drones, also known as UASs (unmanned aerial systems), UAVs (Unmanned Aerial Vehicles) or RPAS (Remotely piloted aircraft systems), are both useful advanced scientific platforms and recreational toys that are appealing to younger generations. As such, they can make for excellent education tools as well as low-cost scientific research project alternatives. However, the process of taking pretty pictures to remote sensing science can be daunting if one is presented with only expensive software and sensor options. There are a number of open-source tools and low cost platform and sensor options available that can provide excellent scientific research results, and, by often requiring more user-involvement than commercial software and sensors, provide even greater educational benefits. Scale-invariant feature transform (SIFT) algorithm implementations, such as the Microsoft Image Composite Editor (ICE), which can create quality 2D image mosaics with some motion and terrain adjustments and VisualSFM (Structure from Motion), which can provide full image mosaicking with movement and orthorectification capacities. RGB image quantification using alternate color space transforms, such as the BreedPix indices, can be calculated via plugins in the open-source software Fiji (http://fiji.sc/Fiji; http://github.com/george-haddad/CIMMYT). Recent analyses of aerial images from UAVs over different vegetation types and environments have shown RGB metrics can outperform more costly commercial sensors. Specifically, Hue-based pixel counts, the Triangle Greenness Index (TGI), and the Normalized Green Red Difference Index (NGRDI) consistently outperformed NDVI in estimating abiotic and biotic stress impacts on crop health. Also, simple kits are available for NDVI camera conversions. Furthermore, suggestions for multivariate analyses of the different RGB indices in the "R program for statistical computing", such as classification and regression trees can allow for a more approachable

  6. Gender Differences in Pay Histories and Views on Pay Entitlement among University Students.

    Science.gov (United States)

    Desmarais, Serge; Curtis, James

    1997-01-01

    Examines whether gender differences in recent pay experience influence entitlement views by providing different standards for female and male students' judgments of their entitlements. Responses from 309 undergraduate students reveal that income gaps in the full-time working world extended to their own recent work experiences and that these past…

  7. Towards canine rabies elimination: Economic comparisons of three project sites.

    Science.gov (United States)

    Elser, J L; Hatch, B G; Taylor, L H; Nel, L H; Shwiff, S A

    2018-02-01

    An appreciation of the costs of implementing canine rabies control in different settings is important for those planning new or expanded interventions. Here we compare the costs of three canine rabies control projects in South Africa, the Philippines and Tanzania to identify factors that influence the overall costs of rabies control efforts. There was considerable variation in the cost of vaccinating each dog, but across the sites these were lower where population density was higher, and later in the projects when dog vaccination coverage was increased. Transportation costs comprised a much higher proportion of total costs in rural areas and where house-to-house vaccination campaigns were necessary. The association between the cost of providing PEP and human population density was less clear. The presence of a pre-existing national rabies management programme had a marked effect on keeping infrastructure and equipment costs for the project low. Finally, the proportion of the total costs of the project provided by the external donor was found to be low for the projects in the Philippines and South Africa, but likely covered close to the complete costs of the project in Tanzania. The detailed economic evaluation of three recent large-scale rabies control pilot projects provides the opportunity to examine economic costs across these different settings and to identify factors influencing rabies control costs that could be applied to future projects. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  8. Wealth and the inflated self: class, entitlement, and narcissism.

    Science.gov (United States)

    Piff, Paul K

    2014-01-01

    Americans may be more narcissistic now than ever, but narcissism is not evenly distributed across social strata. Five studies demonstrated that higher social class is associated with increased entitlement and narcissism. Upper-class individuals reported greater psychological entitlement (Studies 1a, 1b, and 2) and narcissistic personality tendencies (Study 2), and they were more likely to behave in a narcissistic fashion by opting to look at themselves in a mirror (Study 3). Finally, inducing egalitarian values in upper-class participants decreased their narcissism to a level on par with their lower-class peers (Study 4). These findings offer novel evidence regarding the influence of social class on the self and highlight the importance of social stratification to understanding basic psychological processes.

  9. 75 FR 68035 - Proposed Information Collection (Evidence for Transfer of Entitlement of Education Benefits...

    Science.gov (United States)

    2010-11-04

    ... (Evidence for Transfer of Entitlement of Education Benefits) Activity: Comment Request AGENCY: Veterans Benefits Administration, Department of Veterans Affairs. ACTION: Notice. SUMMARY: The Veterans Benefits... receive education benefits under the transfer of entitlement provision of law. Affected Public...

  10. 78 FR 59772 - Proposed Information Collection (Evidence for Transfer of Entitlement of Education Benefits...

    Science.gov (United States)

    2013-09-27

    ... (Evidence for Transfer of Entitlement of Education Benefits) Activity: Comment Request AGENCY: Veterans Benefits Administration, Department of Veterans Affairs. ACTION: Notice. SUMMARY: The Veterans Benefits... receive education benefits under the transfer of entitlement provision of law. Affected Public...

  11. Cost-effectiveness evaluation of an RCT in rehabilitation after lumbar spinal fusion: a low-cost, behavioural approach is cost-effective over individual exercise therapy

    DEFF Research Database (Denmark)

    Søgaard, Rikke; Laurberg, Ida; Christensen, Finn B

    2008-01-01

    Recently, Christensen et al. reported the clinical effects of a low-cost rehabilitation program equally efficient to a relatively intensive program of individual, physiotherapist-guided exercise therapy. Yet, the low-cost approach is not fully supported as an optimal strategy until a full......-scale economic evaluation, including extra-hospital effects such as service utilization in the primary health care sector and return-to-work, is conducted. The objective of this study was to conduct such evaluation i.e. investigate the cost-effectiveness of (1) a low-cost rehabilitation regimen...... with a behavioural element and (2) a regimen of individual exercise therapy, both in comparison with usual practice, from a health economic, societal perspective. Study design was a cost-effectiveness evaluation of an RCT with a 2-year follow-up. Ninety patients having had posterolateral or circumferential fusion...

  12. System identification of a small low-cost unmanned aerial vehicle using flight data from low-cost sensors

    Science.gov (United States)

    Hoffer, Nathan Von

    Remote sensing has traditionally been done with satellites and manned aircraft. While. these methods can yield useful scientificc data, satellites and manned aircraft have limitations in data frequency, process time, and real time re-tasking. Small low-cost unmanned aerial vehicles (UAVs) provide greater possibilities for personal scientic research than traditional remote sensing platforms. Precision aerial data requires an accurate vehicle dynamics model for controller development, robust flight characteristics, and fault tolerance. One method of developing a model is system identification (system ID). In this thesis system ID of a small low-cost fixed-wing T-tail UAV is conducted. The linerized longitudinal equations of motion are derived from first principles. Foundations of Recursive Least Squares (RLS) are presented along with RLS with an Error Filtering Online Learning scheme (EFOL). Sensors, data collection, data consistency checking, and data processing are described. Batch least squares (BLS) and BLS with EFOL are used to identify aerodynamic coecoefficients of the UAV. Results of these two methods with flight data are discussed.

  13. Technical considerations for designing low-cost, long-wave infrared objectives

    Science.gov (United States)

    Desroches, Gerard; Dalzell, Kristy; Robitaille, Blaise

    2014-06-01

    With the growth of uncooled infrared imaging in the consumer market, the balance between cost implications and performance criteria in the objective lens must be examined carefully. The increased availability of consumer-grade, long-wave infrared cameras is related to a decrease in military usage but it is also due to the decreasing costs of the cameras themselves. This has also driven up demand for low-cost, long-wave objectives that can resolve smaller pixels while maintaining high performance. Smaller pixels are traditionally associated with high cost objectives because of higher resolution requirements but, with careful consideration of all the requirements and proper selection of materials, costs can be moderated. This paper examines the cost/performance trade-off implications associated with optical and mechanical requirements of long-wave infrared objectives. Optical performance, f-number, field of view, distortion, focus range and thermal range all affect the cost of the objective. Because raw lens material cost is often the most expensive item in the construction, selection of the material as well as the shape of the lens while maintaining acceptable performance and cost targets were explored. As a result of these considerations, a low-cost, lightweight, well-performing objective was successfully designed, manufactured and tested.

  14. MOCA: A Low-Power, Low-Cost Motion Capture System Based on Integrated Accelerometers

    Directory of Open Access Journals (Sweden)

    Elisabetta Farella

    2007-01-01

    Full Text Available Human-computer interaction (HCI and virtual reality applications pose the challenge of enabling real-time interfaces for natural interaction. Gesture recognition based on body-mounted accelerometers has been proposed as a viable solution to translate patterns of movements that are associated with user commands, thus substituting point-and-click methods or other cumbersome input devices. On the other hand, cost and power constraints make the implementation of a natural and efficient interface suitable for consumer applications a critical task. Even though several gesture recognition solutions exist, their use in HCI context has been poorly characterized. For this reason, in this paper, we consider a low-cost/low-power wearable motion tracking system based on integrated accelerometers called motion capture with accelerometers (MOCA that we evaluated for navigation in virtual spaces. Recognition is based on a geometric algorithm that enables efficient and robust detection of rotational movements. Our objective is to demonstrate that such a low-cost and a low-power implementation is suitable for HCI applications. To this purpose, we characterized the system from both a quantitative point of view and a qualitative point of view. First, we performed static and dynamic assessment of movement recognition accuracy. Second, we evaluated the effectiveness of user experience using a 3D game application as a test bed.

  15. Hot forming and quenching pilot process development for low cost and low environmental impact manufacturing.

    Science.gov (United States)

    Hall, Roger W.; Foster, Alistair; Herrmann Praturlon, Anja

    2017-09-01

    The Hot Forming and in-tool Quenching (HFQ®) process is a proven technique to enable complex shaped stampings to be manufactured from high strength aluminium. Its widespread uptake for high volume production will be maximised if it is able to wholly amortise the additional investment cost of this process compared to conventional deep drawing techniques. This paper discusses the use of three techniques to guide some of the development decisions taken during upscaling of the HFQ® process. Modelling of Process timing, Cost and Life-cycle impact were found to be effective tools to identify where development budget could be focused in order to be able to manufacture low cost panels of different sizes from many different alloys in a sustainable way. The results confirm that raw material cost, panel trimming, and artificial ageing were some of the highest contributing factors to final component cost. Additionally, heat treatment and lubricant removal stages played a significant role in the overall life-cycle assessment of the final products. These findings confirmed development priorities as novel furnace design, fast artificial ageing and low-cost alloy development.

  16. Design of a low-cost hybrid powertrain with large fuel savings

    NARCIS (Netherlands)

    Berkel, van K.; Romers, L.H.J.; Vroemen, B.G.; Hofman, T.; Steinbuch, M.

    2010-01-01

    This paper presents a new design of a low-cost hybrid powertrain with large fuel savings. The hybrid powertrain contains only low-cost mechanical components, such as a flywheel module and a continuously variable transmission (CVT). Noelectrical motor/generator or battery is used. Based on

  17. Providing strong Security and high privacy in low-cost RFID networks

    DEFF Research Database (Denmark)

    David, Mathieu; Prasad, Neeli R.

    2009-01-01

    Since the dissemination of Radio Frequency IDentification (RFID) tags is getting larger and larger, the requirement for strong security and privacy is also increasing. Low-cost and ultra-low-cost tags are being implemented on everyday products, and their limited resources constraints the security...

  18. Benefit–cost analysis of non-marginal climate and energy projects

    International Nuclear Information System (INIS)

    Dietz, Simon; Hepburn, Cameron

    2013-01-01

    Conventional benefit–cost analysis incorporates the normally reasonable assumption that the policy or project under examination is marginal. Among the assumptions this entails is that the policy or project is small, so the underlying growth rate of the economy does not change. However, this assumption may be inappropriate in some important circumstances, including in climate-change and energy policy. One example is global targets for carbon emissions, while another is a large renewable energy project in a small economy, such as a hydropower dam. This paper develops some theory on the evaluation of non-marginal projects, with empirical applications to climate change and energy. We examine the conditions under which evaluation of a non-marginal project using marginal methods may be wrong, and in our empirical examples we show that both qualitative and large quantitative errors are plausible. - Highlights: • This paper develops the theory of the evaluation of non-marginal projects. • It also includes empirical applications to climate change and energy. • We show when evaluation of a non-marginal project using marginal methods is wrong

  19. SECON - A tool for estimation of storage costs and storage project revenue

    International Nuclear Information System (INIS)

    Hall, O.

    1997-01-01

    The SECON model Storage ECONomics is useful for gas suppliers, storage operators, gas distributors and consumers when investigating new storage possibilities. SECON has been used within the Sydkraft group to compare cost for different types of storage and to identify the market niche for lined rock cavern (LRC) storage. In the model cost for the different storage types, salt caverns, LNG, and LRC can be compared. By using input according to market needs each storage type can be validated for a specific service e.g. peak shaving, seasonal storage or balancing. The project revenue can also be calculated. SECON includes three models for income calculation; US storage service, Trading and Avoided Supply Contract Costs. The income models calculates annual turnover, pay of time, net present value, internal rate of return and max. liquidity shortfall for the project. The SECON will facilitate sensitivity analysis both regarding cost for different services and different storage types and on the income side by using different scenarios. At the poster session SECON will be presented live and the delegates will have the opportunity to test the model. (au)

  20. Vulnerability in Determining the Cost of Information System Project to Avoid Loses

    Science.gov (United States)

    Haryono, Kholid; Ikhsani, Zulfa Amalia

    2018-03-01

    Context: This study discusses the priority of cost required in software development projects. Objectives: To show the costing models, the variables involved, and how practitioners assess and decide the priorities of each variable. To strengthen the information, each variable also confirmed the risk if ignored. Method: The method is done by two approaches. First, systematic literature reviews to find the models and variables used to decide the cost of software development. Second, confirm and take judgments about the level of importance and risk of each variable to the software developer. Result: Obtained about 54 variables that appear on the 10 models discussed. The variables are categorized into 15 groups based on the similarity of meaning. Each group becomes a variable. Confirmation results with practitioners on the level of importance and risk. It shown there are two variables that are considered very important and high risk if ignored. That is duration and effort. Conclusion: The relationship of variable rates between the results of literature studies and confirmation of practitioners contributes to the use of software business actors in considering project cost variables.

  1. Cost-effectiveness of an HPV self-collection campaign in Uganda: comparing models for delivery of cervical cancer screening in a low-income setting.

    Science.gov (United States)

    Campos, Nicole G; Tsu, Vivien; Jeronimo, Jose; Njama-Meya, Denise; Mvundura, Mercy; Kim, Jane J

    2017-09-01

    With the availability of a low-cost HPV DNA test that can be administered by either a healthcare provider or a woman herself, programme planners require information on the costs and cost-effectiveness of implementing cervical cancer screening programmes in low-resource settings under different models of healthcare delivery. Using data from the START-UP demonstration project and a micro-costing approach, we estimated the health and economic impact of once-in-a-lifetime HPV self-collection campaign relative to clinic-based provider-collection of HPV specimens in Uganda. We used an individual-based Monte Carlo simulation model of the natural history of HPV and cervical cancer to estimate lifetime health and economic outcomes associated with screening with HPV DNA testing once in a lifetime (clinic-based provider-collection vs a self-collection campaign). Test performance and cost data were obtained from the START-UP demonstration project using a micro-costing approach. Model outcomes included lifetime risk of cervical cancer, total lifetime costs (in 2011 international dollars [I$]), and life expectancy. Cost-effectiveness ratios were expressed using incremental cost-effectiveness ratios (ICERs). When both strategies achieved 75% population coverage, ICERs were below Uganda's per capita GDP (self-collection: I$80 per year of life saved [YLS]; provider-collection: I$120 per YLS). When the self-collection campaign achieved coverage gains of 15-20%, it was more effective than provider-collection, and had a lower ICER unless coverage with both strategies was 50% or less. Findings were sensitive to cryotherapy compliance among screen-positive women and relative HPV test performance. The primary limitation of this analysis is that self-collection costs are based on a hypothetical campaign but are based on unit costs from Uganda. Once-in-a-lifetime screening with HPV self-collection may be very cost-effective and reduce cervical cancer risk by > 20% if coverage is high

  2. Low-cost production of solar-cell panels

    Science.gov (United States)

    Bickler, D. B.; Gallagher, B. D.; Sanchez, L. E.

    1980-01-01

    Large-scale production model combines most modern manufacturing techniques to produce silicon-solar-cell panels of low costs by 1982. Model proposes facility capable of operating around the clock with annual production capacity of 20 W of solar cell panels.

  3. Sensorless control of low-cost single-phase hybrid switched reluctance motor drive

    DEFF Research Database (Denmark)

    Jakobsen, Uffe; Lu, Kaiyuan; Rasmussen, Peter Omand

    2013-01-01

    This paper presents a sensorless-controlled, low-cost, low-power, variable-speed drive system suitable for fan and pump applications. The main advantages of this drive system are the low system cost, simple converter structure, and simple but robust sensorless control technique. The drive motor...... is a special Hybrid Switched Reluctance Motor (HSRM). The proposed sensorless control method utilizes beneficially the stator side permanent magnet field and its performance is motor parameter independent. The unique low-cost drive system solution, simple and robust sensorless control features of this drive...

  4. Sensorless Control of Low-cost Single-phase Hybrid Switched Reluctance Motor Drive

    DEFF Research Database (Denmark)

    Jakobsen, Uffe; Lu, Kaiyuan; Rasmussen, Peter Omand

    2015-01-01

    This paper presents a sensorless-controlled, low-cost, low-power, and variable-speed drive system suitable for fan and pump applications. The main advantages of this drive system are the low system cost, simple converter structure, and simple but robust sensorless control technique. The drive motor...... is a special hybrid switched reluctance motor. The proposed sensorless control method beneficially utilizes the stator side PM field and its performance is motor parameter independent. The unique low-cost drive system solution, simple and robust sensorless control features of this drive system, is demonstrated...

  5. Causes of Low-Skilled Workers’ Performance in Construction Projects

    OpenAIRE

    Alhaji Ali Zannah; Aryani Ahmad Latiffi; Abdulazeez Umar Raji; Abdullahi Abba Waziri; Usman Mohammed 4

    2017-01-01

    Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achie...

  6. Innovative manufacturing and materials for low cost lithium ion batteries

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Steven [Optodot Corporation, Woburn, MA (United States)

    2015-12-29

    This project demonstrated entirely new manufacturing process options for lithium ion batteries with major potential for improved cost and performance. These new manufacturing approaches are based on the use of the new electrode-coated separators instead of the conventional electrode-coated metal current collector foils. The key enabler to making these electrode-coated separators is a new and unique all-ceramic separator with no conventional porous plastic separator present. A simple, low cost, and high speed manufacturing process of a single coating of a ceramic pigment and polymer binder onto a re-usable release film, followed by a subsequent delamination of the all-ceramic separator and any layers coated over it, such as electrodes and metal current collectors, was utilized. A suitable all-ceramic separator was developed that demonstrated the following required features needed for making electrode-coated separators: (1) no pores greater than 100 nanometer (nm) in diameter to prevent any penetration of the electrode pigments into the separator; (2) no shrinkage of the separator when heated to the high oven heats needed for drying of the electrode layer; and (3) no significant compression of the separator layer by the high pressure calendering step needed to densify the electrodes by about 30%. In addition, this nanoporous all-ceramic separator can be very thin at 8 microns thick for increased energy density, while providing all of the performance features provided by the current ceramic-coated plastic separators used in vehicle batteries: improved safety, longer cycle life, and stability to operate at voltages up to 5.0 V in order to obtain even more energy density. The thin all-ceramic separator provides a cost savings of at least 50% for the separator component and by itself meets the overall goal of this project to reduce the cell inactive component cost by at least 20%. The all-ceramic separator also enables further cost savings by its excellent heat stability

  7. Planning and production of a low cost cryostat for electrical characterization of materials

    International Nuclear Information System (INIS)

    Torsoni, G.B.; Carvalho, C.L.; Brito, G.A.

    2010-01-01

    The system BSCCO can show three main Bi 2 Sr 2 CuO, Bi 2 Sr 2 CaCu 2 O and Bi 2 Sr 2 Ca 2 Cu 3 O with critical temperatures around 20 K, 80 K and 110 K, respectively. Therefore, it is fundamental to study these materials in details at lowest temperatures, with simple systems and low cost equipment. In this work was projected a cryogenic system with capacity to reach temperatures below the liquid nitrogen temperature (77 K). Based on thermodynamic principles, which is used with liquid nitrogen system, with the vacuum application and control, it has been achieved temperatures about 63 K (freezing nitrogen temperature) in the sample holder. With the availability of a large range temperature becomes possible to identify at least two superconducting phases as in system BSCCO, which also involves a cost/benefit ratio more favorable, avoiding the use of more expensive refrigerates as liquid helium. (author)

  8. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  9. Cost-effective and low-technology options for simulation and training in neonatology.

    Science.gov (United States)

    Bruno, Christie J; Glass, Kristen M

    2016-11-01

    The purpose of this review is to explore low-cost options for simulation and training in neonatology. Numerous cost-effective options exist for simulation and training in neonatology. Lower cost options are available for teaching clinical skills and procedural training in neonatal intubation, chest tube insertion, and pericardiocentesis, among others. Cost-effective, low-cost options for simulation-based education can be developed and shared in order to optimize the neonatal simulation training experience. Copyright © 2016 Elsevier Inc. All rights reserved.

  10. Towards Greater Harmonisation of Decommissioning Cost Estimates

    International Nuclear Information System (INIS)

    O'Sullivan, Patrick; ); Laraia, Michele; ); LaGuardia, Thomas S.

    2010-01-01

    The NEA Decommissioning Cost Estimation Group (DCEG), in collaboration with the IAEA Waste Technology Section and the EC Directorate-General for Energy and Transport, has recently studied cost estimation practices in 12 countries - Belgium, Canada, France, Germany, Italy, Japan, the Netherlands, Slovakia, Spain, Sweden, the United Kingdom and the United States. Its findings are to be published in an OECD/NEA report entitled Cost Estimation for Decommissioning: An International Overview of Cost Elements, Estimation Practices and Reporting Requirements. This booklet highlights the findings contained in the full report. (authors)

  11. Low-Cost Bio-Based Carbon Fibers for High Temperature Processing

    Energy Technology Data Exchange (ETDEWEB)

    Paul, Ryan Michael [GrafTech International, Brooklyn Heights, OH (United States); Naskar, Amit [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-03

    GrafTech International Holdings Inc. (GTI), under Award No. DE-EE0005779, worked with Oak Ridge National Laboratory (ORNL) under CRADA No. NFE-15-05807 to develop lignin-based carbon fiber (LBCF) technology and to demonstrate LBCF performance in high-temperature products and applications. This work was unique and different from other reported LBCF work in that this study was application-focused and scalability-focused. Accordingly, the executed work was based on meeting criteria based on technology development, cost, and application suitability. High-temperature carbon fiber based insulation is used in energy intensive industries, such as metal heat treating and ceramic and semiconductor material production. Insulation plays a critical role in achieving high thermal and process efficiency, which is directly related to energy usage, cost, and product competitiveness. Current high temperature insulation is made with petroleum based carbon fibers, and one goal of this protect was to develop and demonstrate an alternative lignin (biomass) based carbon fiber that would achieve lower cost, CO2 emissions, and energy consumption and result in insulation that met or exceeded the thermal efficiency of current commercial insulation. In addition, other products were targeted to be evaluated with LBCF. As the project was designed to proceed in stages, the initial focus of this work was to demonstrate lab-scale LBCF from at least 4 different lignin precursor feedstock sources that could meet the estimated production cost of $5.00/pound and have ash level of less than 500 ppm in the carbonized insulation-grade fiber. Accordingly, a preliminary cost model was developed based on publicly available information. The team demonstrated that 4 lignin samples met the cost criteria. In addition, the ash level for the 4 carbonized lignin samples was below 500 ppm. Processing as-received lignin to produce a high purity lignin fiber was a significant accomplishment in that most industrial

  12. Low Cost Night Vision System for Intruder Detection

    Science.gov (United States)

    Ng, Liang S.; Yusoff, Wan Azhar Wan; R, Dhinesh; Sak, J. S.

    2016-02-01

    The growth in production of Android devices has resulted in greater functionalities as well as lower costs. This has made previously more expensive systems such as night vision affordable for more businesses and end users. We designed and implemented robust and low cost night vision systems based on red-green-blue (RGB) colour histogram for a static camera as well as a camera on an unmanned aerial vehicle (UAV), using OpenCV library on Intel compatible notebook computers, running Ubuntu Linux operating system, with less than 8GB of RAM. They were tested against human intruders under low light conditions (indoor, outdoor, night time) and were shown to have successfully detected the intruders.

  13. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Science.gov (United States)

    2010-04-01

    ... breakdown of all project costs and that each cost element making up the project be reviewed for... either a firm commitment of its funds or a decision not to participate in the project; and B. Equity... his/her motivation remains high to pursue the business with vigor. The amount, type and terms of the...

  14. Mars Relay Satellite: Key to Enabling Low-Cost Exploration Missions

    Science.gov (United States)

    Hastrup, R.; Cesarone, R.; Miller, A.

    1993-01-01

    Recently, there has been increasing evidence of a renewed focus on Mars exploration both by NASA and the international community. The thrust of this renewed interest appears to be manifesting itself in numerous low-cost missions employing small, light weight elements, which utilize advanced technologies including integrated microelectronics. A formidable problem facing these low-cost missions is communications with Earth. Providing adequate direct-link performance has very significant impacts on spacecraft power, pointing, mass and overall complexity. Additionally, for elements at or near the surface of Mars, there are serious connectivity constraints, especially at higher latitudes, which lose view of Earth for up to many months at a time. This paper will discuss the role a Mars relay satellite can play in enabling and enhancing low-cost missions to Mars...

  15. A low-cost, high-resolution, video-rate imaging optical radar

    Energy Technology Data Exchange (ETDEWEB)

    Sackos, J.T.; Nellums, R.O.; Lebien, S.M.; Diegert, C.F. [Sandia National Labs., Albuquerque, NM (United States); Grantham, J.W.; Monson, T. [Air Force Research Lab., Eglin AFB, FL (United States)

    1998-04-01

    Sandia National Laboratories has developed a unique type of portable low-cost range imaging optical radar (laser radar or LADAR). This innovative sensor is comprised of an active floodlight scene illuminator and an image intensified CCD camera receiver. It is a solid-state device (no moving parts) that offers significant size, performance, reliability, and simplicity advantages over other types of 3-D imaging sensors. This unique flash LADAR is based on low cost, commercially available hardware, and is well suited for many government and commercial uses. This paper presents an update of Sandia`s development of the Scannerless Range Imager technology and applications, and discusses the progress that has been made in evolving the sensor into a compact, low, cost, high-resolution, video rate Laser Dynamic Range Imager.

  16. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  17. Decommissioning of nuclear facilities: Feasibility, needs and costs

    International Nuclear Information System (INIS)

    DeLaney, E.G.; Mickelson, J.R.

    1985-01-01

    The Nuclear Energy Agency's Working Group on Decommissioning is preparing a study entitled ''Decommissioning of Nuclear Facilities: Feasibility, Needs and Costs.'' The study addresses the economics, technical feasibility and waste management aspects of decommissioning larger commercial reactors and nuclear support facilities. Experience on decommissioning small reactors and fuel cycle facilities shows that current technology is generally adequate. Several major projects that are either underway or planned will demonstrate decommissioning of the larger and more complex facilities. This experience will provide a framework for planning and engineering the decommissioning of the larger commercial reactors and fuel cycle facilities. Several areas of technology development are desired for worker productivity improvement, occupational exposure reduction, and waste volume reduction. In order to assess and plan for the decommissioning of large commercial nuclear facilities, projections have been made of the capacity of these facilities that may be decommissioned in the future and the radioactive waste that would be produced from the decommissioning of these facilities. These projections through the year 2025 are based on current data and the OECD reactor capacity forecast through the year 2000. A 25-year operating lifetime for electrical power generation was assumed. The possibilities of plant lifetime extension and the deferral of plant dismantlement make this projection very conservative

  18. A Low-Cost, High-Precision Navigator, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Toyon Research Corporation proposes to develop and demonstrate a prototype low-cost precision navigation system using commercial-grade gyroscopes and accelerometers....

  19. Low-cost amplifier for alpha detection with photodiode

    Energy Technology Data Exchange (ETDEWEB)

    Domienikan, Cláudio; Costa, Priscila; Genezini, Frederico A.; Zahn, Guilherme S., E-mail: clanikan@ipen.br, E-mail: pcosta@ipen.br, E-mail: fredzini@ipen.br, E-mail: gzahn@ipen.br [Instituto de Pesquisas Energéticas e Nucleares (IPEN/CNEN-SP), São Paulo, SP (Brazil)

    2017-07-01

    A low-cost amplifier for Hamamatsu S3590-09 PIN photodiode to be used in alpha detection is presented. This amplifier consists basically of two circuits: a pulse preamplifier and a shaper-driver. The PIN photodiode is reverse-biased and connected to a charge preamplifier input. Incident alpha particles generate a small current pulse in the photodiode. The integrating circuit of the low noise preamplifier transforms current pulse into a voltage pulse with amplitude proportional to the charge carried by the current pulse. The shaper-driver consists of a differentiator and an integrator and is responsible for filtering and further amplifying the preamplifier signal, generating a NIM-compatible energy pulse. The performance of the set photodiode-amplifier was successively tested through the use of a {sup 243}Am radioactive source. The low-cost photodiode amplifier was designed and constructed at IPEN - CNEN/SP using national components and expertise. (author)

  20. Fundamental understanding and development of low-cost, high-efficiency silicon solar cells

    Energy Technology Data Exchange (ETDEWEB)

    ROHATGI,A.; NARASIMHA,S.; MOSCHER,J.; EBONG,A.; KAMRA,S.; KRYGOWSKI,T.; DOSHI,P.; RISTOW,A.; YELUNDUR,V.; RUBY,DOUGLAS S.

    2000-05-01

    The overall objectives of this program are (1) to develop rapid and low-cost processes for manufacturing that can improve yield, throughput, and performance of silicon photovoltaic devices, (2) to design and fabricate high-efficiency solar cells on promising low-cost materials, and (3) to improve the fundamental understanding of advanced photovoltaic devices. Several rapid and potentially low-cost technologies are described in this report that were developed and applied toward the fabrication of high-efficiency silicon solar cells.

  1. Innovative High-Performance Deposition Technology for Low-Cost Manufacturing of OLED Lighting

    Energy Technology Data Exchange (ETDEWEB)

    Scott, David; Hamer, John

    2017-06-30

    In this project, OLEDWorks developed and demonstrated the innovative high-performance deposition technology required to deliver dramatic reductions in the cost of manufacturing OLED lighting in production equipment. The current high manufacturing cost of OLED lighting is the most urgent barrier to its market acceptance. The new deposition technology delivers solutions to the two largest parts of the manufacturing cost problem – the expense per area of good product for organic materials and for the capital cost and depreciation of the equipment. Organic materials cost is the largest expense item in the bill of materials and is predicted to remain so through 2020. The high-performance deposition technology developed in this project, also known as the next generation source (NGS), increases material usage efficiency from 25% found in current Gen2 deposition technology to 60%. This improvement alone results in a reduction of approximately $25/m2 of good product in organic materials costs, independent of production volumes. Additionally, this innovative deposition technology reduces the total depreciation cost from the estimated value of approximately $780/m2 of good product for state-of-the-art G2 lines (at capacity, 5-year straight line depreciation) to $170/m2 of good product from the OLEDWorks production line.

  2. EUDP Project: Low Noise Airfoil - Final Report

    DEFF Research Database (Denmark)

    This document summarizes the scientific results achieved during the EUDP-funded project `Low-Noise Airfoil'. The goals of this project are, on one side to develop a measurement technique that permits the evaluation of trailing edge noise in a classical aerodynamic wind tunnel, and on the other side...... to develop and implement a design procedure to manufacture airfoil profiles with low noise emission. The project involved two experimental campaigns: one in the LM Wind Power wind tunnel, a classical aerodynamic wind tunnel, in Lunderskov (DK), the second one in the Virginia Tech Stability Wind Tunnel....... In particular, the so-called TNO trailing edge noise model could be significantly improved by introducing turbulence anisotropy in its formulation, as well as the influence of the boundary layer mean pressure gradient. This two characteristics are inherent to airfoil flows but were neglected in the original...

  3. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  4. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  5. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  6. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  7. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  8. Challenges for landslide hazard and risk management in ‘low-risk’ regions, Czech Republic—landslide occurrences and related costs (IPL project no. 197)

    Czech Academy of Sciences Publication Activity Database

    Klimeš, Jan; Stemberk, Jakub; Blahůt, Jan; Krejčí, V.; Krejčí, O.; Hartvich, Filip; Kycl, P.

    2017-01-01

    Roč. 14, č. 2 (2017), s. 771-780 ISSN 1612-510X R&D Projects: GA MŠk(CZ) LG15007 Institutional support: RVO:67985891 Keywords : landslide inventory * ICL/IPL activities * landslide cost * landslide risk * fatal landslides * public awareness Subject RIV: DE - Earth Magnetism, Geodesy, Geography OBOR OECD: Physical geography Impact factor: 3.657, year: 2016

  9. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  10. Community Air Sensor Network (CAIRSENSE) project: Evaluation of low-cost sensor performance in a suburban environment in the southeastern United States

    Science.gov (United States)

    Advances in air pollution sensor technology have enabled the development of small and low cost systems to measure outdoor air pollution. The deployment of a large number of sensors across a small geographic area would have potential benefits to supplement traditional monitoring n...

  11. Producing optical (contact) lenses by a novel low cost process

    Science.gov (United States)

    Skipper, Richard S.; Spencer, Ian D.

    2005-09-01

    The rapid and impressive growth of China has been achieved on the back of highly labour intensive industries, often in manufacturing, and at the cost of companies and jobs in Europe and America. Approaches that worked well in the 1990's to reduce production costs in the developed countries are no longer effective when confronted with the low labour costs of China and India. We have looked at contact lenses as a product that has become highly available to consumers here but as an industry that has reduced costs by moving to low labour cost countries. The question to be answered was, "Do we have the skill to still make the product in the UK, and can we make it cheap enough to export to China?" if we do not, then contact lens manufacture will move to China sooner or later. The challenge to enter the markets of the BRIC (Brazil, Russia, India and China) countries is extremely exciting as here is the new money, high growth and here is a product that sells to those with disposable incomes. To succeed we knew we had to be radical in our approach; the radical step was very simple: to devise a process in which each step added value to the customer and not cost to the product. The presentation examines the processes used by the major producers and how, by applying good manufacturing practice sound scientific principles to them, the opportunity to design a new low cost patented process was identified.

  12. Multiple Kernel Sparse Representation based Orthogonal Discriminative Projection and Its Cost-Sensitive Extension.

    Science.gov (United States)

    Zhang, Guoqing; Sun, Huaijiang; Xia, Guiyu; Sun, Quansen

    2016-07-07

    Sparse representation based classification (SRC) has been developed and shown great potential for real-world application. Based on SRC, Yang et al. [10] devised a SRC steered discriminative projection (SRC-DP) method. However, as a linear algorithm, SRC-DP cannot handle the data with highly nonlinear distribution. Kernel sparse representation-based classifier (KSRC) is a non-linear extension of SRC and can remedy the drawback of SRC. KSRC requires the use of a predetermined kernel function and selection of the kernel function and its parameters is difficult. Recently, multiple kernel learning for SRC (MKL-SRC) [22] has been proposed to learn a kernel from a set of base kernels. However, MKL-SRC only considers the within-class reconstruction residual while ignoring the between-class relationship, when learning the kernel weights. In this paper, we propose a novel multiple kernel sparse representation-based classifier (MKSRC), and then we use it as a criterion to design a multiple kernel sparse representation based orthogonal discriminative projection method (MK-SR-ODP). The proposed algorithm aims at learning a projection matrix and a corresponding kernel from the given base kernels such that in the low dimension subspace the between-class reconstruction residual is maximized and the within-class reconstruction residual is minimized. Furthermore, to achieve a minimum overall loss by performing recognition in the learned low-dimensional subspace, we introduce cost information into the dimensionality reduction method. The solutions for the proposed method can be efficiently found based on trace ratio optimization method [33]. Extensive experimental results demonstrate the superiority of the proposed algorithm when compared with the state-of-the-art methods.

  13. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  14. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  15. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  16. Cost Assessment Methodology and Economic Viability of Tidal Energy Projects

    Directory of Open Access Journals (Sweden)

    Eva Segura

    2017-11-01

    Full Text Available The exploitation of technologies with which to harness the energy from ocean currents will have considerable possibilities in the future thanks to their enormous potential for electricity production and their high predictability. In this respect, the development of methodologies for the economic viability of these technologies is fundamental to the attainment of a consistent quantification of their costs and the discovery of their economic viability, while simultaneously attracting investment in these technologies. This paper presents a methodology with which to determine the economic viability of tidal energy projects, which includes a technical study of the life-cycle costs into which the development of a tidal farm can be decomposed: concept and definition, design and development, manufacturing, installation, operation and maintenance and dismantling. These cost structures are additionally subdivided by considering their sub-costs and bearing in mind the main components of the tidal farm: the nacelle, the supporting tidal energy converter structure and the export power system. Furthermore, a technical study is developed in order to obtain an estimation of the annual energy produced (and, consequently, the incomes generated if the electric tariff is known by considering its principal attributes: the characteristics of the current, the ability of the device to capture energy and its ability to convert and export the energy. The methodology has been applied (together with a sensibility analysis to the particular case of a farm composed of first generation tidal energy converters in one of the Channel Island Races, the Alderney Race, in the U.K., and the results have been attained by means of the computation of engineering indexes, such as the net present value, the internal rate of return, the discounted payback period and the levelized cost of energy, which indicate that the proposed project is economically viable for all the case studies.

  17. Low-cost wireless voltage & current grid monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Hines, Jacqueline [SenSanna Inc., Arnold, MD (United States)

    2016-12-31

    This report describes the development and demonstration of a novel low-cost wireless power distribution line monitoring system. This system measures voltage, current, and relative phase on power lines of up to 35 kV-class. The line units operate without any batteries, and without harvesting energy from the power line. Thus, data on grid condition is provided even in outage conditions, when line current is zero. This enhances worker safety by detecting the presence of voltage and current that may appear from stray sources on nominally isolated lines. Availability of low-cost power line monitoring systems will enable widespread monitoring of the distribution grid. Real-time data on local grid operating conditions will enable grid operators to optimize grid operation, implement grid automation, and understand the impact of solar and other distributed sources on grid stability. The latter will enable utilities to implement eneygy storage and control systems to enable greater penetration of solar into the grid.

  18. Low cost Czochralski crystal growing technology. Near implementation of the flat plate photovoltaic cost reduction of the low cost solar array project

    Science.gov (United States)

    Roberts, E. G.

    1980-01-01

    Equipment developed for the manufacture of over 100 kg of silicon ingot from one crucible by rechanging from another crucible is described. Attempts were made to eliminate the cost of raising the furnace temperature to 250 C above the melting point of silicon by using an RF coil to melt polycrystalline silicon rod as a means of rechanging the crucible. Microprocessor control of the straight growth process was developed and domonstrated for both 4 inch and 6 inch diameter. Both meltdown and melt stabilization processes were achieved using operator prompting through the microprocessor. The use of the RF work coil in poly rod melting as a heat sink in the accelerated growth process was unsuccessful. The total design concept for fabrication and interfacing of the total cold crucible system was completed.

  19. Pebble bed modular reactors versus other generation technologies. Costs and challenges for South Africa

    International Nuclear Information System (INIS)

    Grubert, Emily; Parks, Brian; Schneider, Erich; Sekar, Srinivas

    2011-01-01

    South Africa is Africa's major economy, with plans to double its electricity generation capacity by 2026. South Africa has spent almost two decades developing a nuclear reactor known as a Pebble Bed Modular Reactor (PBMR), which could provide substantial benefits to the electricity grid but was recently mothballed due to high costs. This work estimates the lifecycle financial costs of South African PBMRs, then compares these costs to those of five other generation options: coal, nuclear as pressurized water reactors (PWRs), wind, and solar as photovoltaics (PV) or concentrating solar power (CSP). Each technology is evaluated with low, base case, and high assumptions for capital costs, construction time, and interest rates. Decommissioning costs, project lifetime, capacity factors, and sensitivity to carbon price are also considered. PBMR could be cost competitive with coal under certain low cost conditions, even without a carbon price. However, international lending practices and other factors suggest that a high capital cost, high interest rate nuclear plant is likely to be competing with a low capital cost, low interest rate coal plant in a market where cost recovery is challenging. PBMR could potentially become more competitive if low rate international loans were available to nuclear projects or became unavailable to coal projects. (author)

  20. Project Magnify: Increasing Reading Skills in Students with Low Vision

    Science.gov (United States)

    Farmer, Jeanie; Morse, Stephen E.

    2007-01-01

    Modeled after Project PAVE (Corn et al., 2003) in Tennessee, Project Magnify is designed to test the idea that students with low vision who use individually prescribed magnification devices for reading will perform as well as or better than students with low vision who use large-print reading materials. Sixteen students with low vision were…

  1. A Low Cost Single Chip VDL Compatible Transceiver ASIC

    Science.gov (United States)

    Becker, Robert

    2004-01-01

    Recent trends in commercial communications system components have focussed almost exclusively on cellular telephone technology. As many of the traditional sources of receiver components have discontinued non-cellular telephone products, the designers of avionics and other low volume radio applications find themselves increasingly unable to find highly integrated components. This is particularly true for low power, low cost applications which cannot afford the lavish current consumption of the software defined radio approach increasingly taken by certified device manufacturers. In this paper, we describe a low power transceiver chip targeting applications from low VHF to low UHF frequencies typical of avionics systems. The chip encompasses a selectable single or double conversion design for the receiver and a low power IF upconversion transmitter. All local oscillators are synthesized and integrated into the chip. An on-chip I-Q modulator and demodulator provide baseband modulation and demodulation capability allowing the use of low power, fixed point signal processing components for signal demodulation. The goal of this program is to demonstrate a low cost VDL mode-3 transceiver using this chip to receive text weather information sent using 4-slot TDMA with no support for voice. The data will be sent from an experimental ground station. This work is funded by NASA Glenn Research Center.

  2. Prosthetic design directives: Low-cost hands within reach.

    Science.gov (United States)

    Jones, G K; Rosendo, A; Stopforth, R

    2017-07-01

    Although three million people around the world suffer from the lack of one or both upper limbs 80% of this number is located within developing countries. While prosthetic prices soar with technology 3D printing and low cost electronics present a sensible solution for those that cannot afford expensive prosthetics. The electronic and control design of a low-cost prosthetic hand, the Touch Hand II, is discussed. This paper shows that sensorless techniques can be used to reduce design complexities, costs, and provide easier access to the electronics. A closing and opening finite state machine (COFSM) was developed to handle the actuated digit joint control state and a supervisory switching control scheme, used for speed and grip strength control. Three torque and speed settings were created to be preset for specific grasps. The hand was able to replicate ten frequently used grasps and grip some common objects. Future work is necessary to enable a user to control it with myoelectric signals (MESs) and to solve operational problems related to electromagnetic interference (EMI).

  3. Synthesis and characterization of low cost magnetorheological (MR) fluids

    Science.gov (United States)

    Sukhwani, V. K.; Hirani, H.

    2007-04-01

    Magnetorheological fluids have great potential for engineering applications due to their variable rheological behavior. These fluids find applications in dampers, brakes, shock absorbers, and engine mounts. However their relatively high cost (approximately US600 per liter) limits their wide usage. Most commonly used magnetic material "Carbonyl iron" cost more than 90% of the MR fluid cost. Therefore for commercial viability of these fluids there is need of alternative economical magnetic material. In the present work synthesis of MR fluid has been attempted with objective to produce low cost MR fluid with high sedimentation stability and greater yield stress. In order to reduce the cost, economical electrolytic Iron powder (US 10 per Kg) has been used. Iron powder of relatively larger size (300 Mesh) has been ball milled to reduce their size to few microns (1 to 10 microns). Three different compositions have been prepared and compared for MR effect produced and stability. All have same base fluid (Synthetic oil) and same magnetic phase i.e. Iron particles but they have different additives. First preparation involves organic additives Polydimethylsiloxane (PDMS) and Stearic acid. Other two preparations involve use of two environmental friendly low-priced green additives guar gum (US 2 per Kg) and xanthan gum (US 12 per Kg) respectively. Magnetic properties of Iron particles have been measured by Vibrating Sample Magnetometer (VSM). Morphology of Iron particles and additives guar gum and xanthan gum has been examined by Scanning Electron Microscopy (SEM) and Particles Size Distribution (PSD) has been determined using Particle size analyzer. Microscopic images of particles, MH plots and stability of synthesized MR fluids have been reported. The prepared low cost MR fluids showed promising performance and can be effectively used for engineering applications demanding controllability in operations.

  4. Development of Innovative Technology to Provide Low-Cost Surface Atmospheric Observations

    Science.gov (United States)

    Kucera, Paul; Steinson, Martin

    2016-04-01

    Accurate and reliable real-time monitoring and dissemination of observations of surface weather conditions is critical for a variety of societal applications. Applications that provide local and regional information about temperature, precipitation, moisture, and winds, for example, are important for agriculture, water resource monitoring, health, and monitoring of hazard weather conditions. In many regions in Africa (and other global locations), surface weather stations are sparsely located and/or of poor quality. Existing stations have often been sited incorrectly, not well-maintained, and have limited communications established at the site for real-time monitoring. The US National Weather Service (NWS) International Activities Office (IAO) in partnership with University Corporation for Atmospheric Research (UCAR)/National Center for Atmospheric Research (NCAR) and funded by the United States Agency for International Development (USAID) Office of Foreign Disaster Assistance (OFDA) has started an initiative to develop and deploy low-cost weather instrumentation in sparsely observed regions of the world. The goal is to provide observations for environmental monitoring, and early warning alert systems that can be deployed at weather services in developing countries. Instrumentation is being designed using innovative new technologies such as 3D printers, Raspberry Pi computing systems, and wireless communications. The initial effort is focused on designing a surface network using GIS-based tools, deploying an initial network in Zambia, and providing training to Zambia Meteorological Department (ZMD) staff. The presentation will provide an overview of the project concepts, design of the low cost instrumentation, and initial experiences deploying a surface network deployment in Zambia.

  5. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  6. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  7. Low-Cost Experimentation for the Study of Droplet Microfluidics

    Science.gov (United States)

    Bardin, David; Lee, Abraham P.

    2014-01-01

    The continued growth of microfluidics into industry settings in areas such as point-of-care diagnostics and targeted therapeutics necessitates a workforce trained in microfluidic technologies and experimental methods. Laboratory courses for students at the university and high school levels will require cost-effective in-class demonstrations that instruct in chip design, fabrication, and experimentation at the microscale. We present a hand-operated pressure pumping system to form monodisperse picoliter to nanoliter droplet streams at low cost, and a series of exercises aimed at instructing in the specific art of droplet formation. Using this setup, the student is able to generate and observe the modes of droplet formation in flow-focusing devices, and the effect of device dimensions on the characteristics of formed droplets. Lastly, at ultra-low cost we demonstrate large plug formation in a T-junction using coffee stirrers as a master mold substitute. Our method reduces the cost of experimentation to enable intuitive instruction in droplet formation, with additional implications for creating droplets in the field or at point-of-care. PMID:25133595

  8. Projecting the potential impact of the Cap-Score™ on clinical pregnancy, live births, and medical costs in couples with unexplained infertility.

    Science.gov (United States)

    Babigumira, Joseph B; Sharara, Fady I; Garrison, Louis P

    2018-01-01

    The Cap-Score™ was developed to assess the capacitation status of men, thereby enabling personalized management of unexplained infertility by choosing timed intrauterine insemination (IUI), versus immediate in vitro fertilization (IVF) or intracytoplasmic sperm injection (ICSI) in individuals with a low Cap-Score™. The objective of this study was to estimate the differences in outcomes and costs comparing the use of the Cap-Score™ with timed IUI (CS-TI) and the standard of care (SOC), which was assumed to be three IUI cycles followed by three IVF-ICSI cycles. We developed and parameterized a decision-analytic model of management of unexplained infertility for women based on data from the published literature. We calculated the clinical pregnancy rates, live birth rates, and medical costs comparing CS-TI and SOC. We used Monte Carlo simulation to quantify uncertainty in projected estimates and performed univariate sensitivity analysis. Compared to SOC, CS-TI was projected to increase the pregnancy rate by 1-26%, marginally reduce live birth rates by 1-3% in couples with women below 40 years, increase live birth rates by 3-7% in couples with women over 40 years, reduce mean medical costs by $4000-$19,200, reduce IUI costs by $600-$1370, and reduce IVF costs by $3400-$17,800, depending on the woman's age. The Cap-Score™ is a potentially valuable clinical tool for management of unexplained infertility because it is projected to improve clinical pregnancy rates, save money, and, depending on the price of the test, increase access to treatment for infertility.

  9. Back home after an acquired brain injury: building a "low-cost" team to provide theory-driven cognitive rehabilitation after routine interventions.

    Science.gov (United States)

    Pierini, Davide; Hoerold, Doreen

    2014-01-01

    Individuals with Acquired Brain Injury (ABI) could benefit from further cognitive rehabilitation, after they have returned home. However, a lack of specialist services to provide such rehabilitation often prevents this. This leads to reduced reintegration of patients, increased social disadvantages and ultimately, higher economic costs. 10 months post-stroke, a 69 year-old woman was discharged from an inpatient rehabilitation program and returned home with severe cognitive impairments. We describe a pilot project which provided an individualised, low cost rehabilitation program, supervised and trained by a neuropsychologist. Progress was monitored every 3 months in order to decide on continuation of the program, based on the achieved results and predicted costs. Post intervention, despite severe initial impairment, cognitive and most notably daily functioning had improved. Although the financial investment was moderately high for the family, the intervention was still considered cost-effective when compared with the required costs of care in a local non-specialist care home. Moreover, the pilot experience was used to build a "local expert team" available for other individuals requiring rehabilitation. These results encourage the development of similar local "low cost" teams in the community, to provide scientifically-grounded cognitive rehabilitation for ABI patients returning home.

  10. Development of processes for the production of low cost silicon dendritic web for solar cells

    Science.gov (United States)

    Duncan, C. S.; Seidensticker, R. G.; Mchugh, J. P.; Hopkins, R. H.; Skutch, M. E.; Driggers, J. M.; Hill, F. E.

    1980-01-01

    High area output rates and continuous, automated growth are two key technical requirements for the growth of low-cost silicon ribbons for solar cells. By means of computer-aided furnace design, silicon dendritic web output rates as high as 27 sq cm/min have been achieved, a value in excess of that projected to meet a $0.50 per peak watt solar array manufacturing cost. The feasibility of simultaneous web growth while the melt is replenished with pelletized silicon has also been demonstrated. This step is an important precursor to the development of an automated growth system. Solar cells made on the replenished material were just as efficient as devices fabricated on typical webs grown without replenishment. Moreover, web cells made on a less-refined, pelletized polycrystalline silicon synthesized by the Battelle process yielded efficiencies up to 13% (AM1).

  11. Application of low-cost methodologies for mobile phone app development.

    Science.gov (United States)

    Zhang, Melvyn; Cheow, Enquan; Ho, Cyrus Sh; Ng, Beng Yeong; Ho, Roger; Cheok, Christopher Cheng Soon

    2014-12-09

    The usage of mobile phones and mobile phone apps in the recent decade has indeed become more prevalent. Previous research has highlighted a method of using just the Internet browser and a text editor to create an app, but this does not eliminate the challenges faced by clinicians. More recently, two methodologies of app development have been shared, but there has not been any disclosures pertaining to the costs involved. In addition, limitations such as the distribution and dissemination of the apps have not been addressed. The aims of this research article are to: (1) highlight a low-cost methodology that clinicians without technical knowledge could use to develop educational apps; (2) clarify the respective costs involved in the process of development; (3) illustrate how limitations pertaining to dissemination could be addressed; and (4) to report initial utilization data of the apps and to share initial users' self-rated perception of the apps. In this study, we will present two techniques of how to create a mobile app using two of the well-established online mobile app building websites. The costs of development are specified and the methodology of dissemination of the apps will be shared. The application of the low-cost methodologies in the creation of the "Mastering Psychiatry" app for undergraduates and "Déjà vu" app for postgraduates will be discussed. A questionnaire survey has been administered to undergraduate students collating their perceptions towards the app. For the Mastering Psychiatry app, a cumulative total of 722 users have used the mobile app since inception, based on our analytics. For the Déjà vu app, there has been a cumulative total of 154 downloads since inception. The utilization data demonstrated the receptiveness towards these apps, and this is reinforced by the positive perceptions undergraduate students (n=185) had towards the low-cost self-developed apps. This is one of the few studies that have demonstrated the low-cost

  12. Effects of customer entitlement on service workers' physical and psychological well-being: a study of waitstaff employees.

    Science.gov (United States)

    Fisk, Glenda M; Neville, Lukas B

    2011-10-01

    This exploratory study examines the nature of customer entitlement and its impact on front-line service employees. In an open-ended qualitative inquiry, 56 individuals with waitstaff experience described the types of behaviors entitled customers engage in and the kinds of service-related "perks" these individuals feel deserving of. Participants explained how they responded to entitled customers, how and when managers became involved, and how their dealings with these patrons influenced their subjective physical and psychological well-being. We found that the behaviors of entitled customers negatively impacted waitstaff employees. Participants reported physiological arousal, negative affect, burnout, and feelings of dehumanization as a result of dealing with these patrons. While respondents drew on a variety of strategies to manage their encounters with entitled customers, they indicated workplace support was often informal and described feeling abandoned by management in dealing with this workplace stressor. Approaching customer entitlement as a form of microaggression, we offer recommendations for practice and suggest new directions for future research. . (PsycINFO Database Record (c) 2011 APA, all rights reserved).

  13. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Science.gov (United States)

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  14. Low-Cost Propellant Launch From a Tethered Balloon

    Science.gov (United States)

    Wilcox, Brian

    2006-01-01

    A document presents a concept for relatively inexpensive delivery of propellant to a large fuel depot in low orbit around the Earth, for use in rockets destined for higher orbits, the Moon, and for remote planets. The propellant is expected to be at least 85 percent of the mass needed in low Earth orbit to support the NASA Exploration Vision. The concept calls for the use of many small ( 10 ton) spin-stabilized, multistage, solid-fuel rockets to each deliver 250 kg of propellant. Each rocket would be winched up to a balloon tethered above most of the atmospheric mass (optimal altitude 26 2 km). There, the rocket would be aimed slightly above the horizon, spun, dropped, and fired at a time chosen so that the rocket would arrive in orbit near the depot. Small thrusters on the payload (powered, for example, by boil-off gases from cryogenic propellants that make up the payload) would precess the spinning rocket, using data from a low-cost inertial sensor to correct for small aerodynamic and solid rocket nozzle misalignment torques on the spinning rocket; would manage the angle of attack and the final orbit insertion burn; and would be fired on command from the depot in response to observations of the trajectory of the payload so as to make small corrections to bring the payload into a rendezvous orbit and despin it for capture by the depot. The system is low-cost because the small rockets can be mass-produced using the same techniques as those to produce automobiles and low-cost munitions, and one or more can be launched from a U.S. territory on the equator (Baker or Jarvis Islands in the mid-Pacific) to the fuel depot on each orbit (every 90 minutes, e.g., any multiple of 6,000 per year).

  15. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  16. Development of a low cost, low temperature cryocooler using the Gifford McMahon cycle

    Science.gov (United States)

    Ramanayaka, A.; Mani, R.

    2008-03-01

    Although Helium is the second most abundant element, its concentration in the earth's atmosphere is fairly low and constant, as the portion that escapes from the atmosphere is replace by new emission. Historically, Helium was extracted as a byproduct of natural gas production, and stored in gas fields in a National Helium Reserve, in an attempt to conserve this interesting element. National policy has changed and the cost of liquid Helium has increased rapidly in the recent past. These new circumstances have created new interest in alternative eco-friendly methods to realizing and maintaining low temperatures in the laboratory. There have been number of successful attempts at making low temperature closed cycle Helium refrigerators by modifying an existing closed cycle system, and usually the regenerator has been replaced in order to achieve the desired results. Here, we discus our attempt to fabricate a low cost, low temperature closed cycle Helium refrigerator starting from a 15K Gifford McMahon system. We reexamine the barriers to realizing lower temperature here and our attempts at overcoming them.

  17. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  18. Low-Cost Resonant Cavity Raman Gas Probe for Multi-Gas Detection

    Science.gov (United States)

    Thorstensen, J.; Haugholt, K. H.; Ferber, A.; Bakke, K. A. H.; Tschudi, J.

    2014-12-01

    Raman based gas sensing can be attractive in several industrial applications, due to its multi-gas sensing capabilities and its ability to detect O_2 and N_2. In this article, we have built a Raman gas probe, based on low-cost components, which has shown an estimated detection limit of 0.5 % for 30 second measurements of N_2 and O_2. While this detection limit is higher than that of commercially available equipment, our estimated component cost is approximately one tenth of the price of commercially available equipment. The use of a resonant Fabry-Pérot cavity increases the scattered signal, and hence the sensitivity, by a factor of 50. The cavity is kept in resonance using a piezo-actuated mirror and a photodiode in a feedback loop. The system described in this article was made with minimum-cost components to demonstrate the low-cost principle. However, it is possible to decrease the detection limit using a higher-powered (but still low-cost) laser and improving the collection optics. By applying these improvements, the detection limit and estimated measurement precision will be sufficient for e.g. the monitoring of input gases in combustion processes, such as e.g. (bio-)gas power plants. In these processes, knowledge about gas compositions with 0.1 % (absolute) precision can help regulate and optimize process conditions. The system has the potential to provide a low-cost, industrial Raman sensor that is optimized for specific gas-detection applications.

  19. Recovery Act: Low Cost Integrated Substrate for OLED Lighting Development

    Energy Technology Data Exchange (ETDEWEB)

    Benton, Scott [PPG Industries, Inc., Pittsburgh, PA (United States); Bhandari, Abhinav [PPG Industries, Inc., Pittsburgh, PA (United States)

    2012-12-26

    PPG pursued the development of an integrated substrate, including the anode, external, and internal extraction layers. The objective of PPG's program was to achieve cost reductions by displacing the existing expensive borosilicate or double-side polished float glass substrates and developing alternative electrodes and scalable light extraction layer technologies through focused and short-term applied research. One of the key highlights of the project was proving the feasibility of using PPG's high transmission Solarphire® float glass as a substrate to consistently achieve organic lightemitting diode (OLED) devices with good performance and high yields. Under this program, four low-cost alternatives to the Indium Tin Oxide (ITO) anode were investigated using pilot-scale magnetron sputtered vacuum deposition (MSVD) and chemical vapor deposition (CVD) technologies. The anodes were evaluated by fabricating small and large phosphorescent organic lightemitting diode (PHOLED) devices at Universal Display Corporation (UDC). The device performance and life-times comparable to commercially available ITO anodes were demonstrated. A cost-benefit analysis was performed to down-select two anodes for further low-cost process development. Additionally, PPG developed and evaluated a number of scalable and compatible internal and external extraction layer concepts such as scattering layers on the outside of the glass substrate or between the transparent anode and the glass interface. In one external extraction layer (EEL) approach, sol-gel sprayed pyrolytic coatings were deposited using lab scale equipment by hand or automated spraying of sol-gel solutions on hot glass, followed by optimizing of scattering with minimal absorption. In another EEL approach, PPG tested large-area glass texturing by scratching a glass surface with an abrasive roller and acid etching. Efficacy enhancements of 1.27x were demonstrated using white PHOLED devices for 2.0mm substrates which are

  20. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.