  1. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  2. 75 FR 2133 - Construction and Operation of the Quartzsite Solar Energy Project, La Paz County, AZ (DOE/EIS-0440)

    Science.gov (United States)

    2010-01-14

    ... Quartzsite Solar Energy Project, La Paz County, AZ (DOE/EIS-0440) AGENCY: Western Area Power Administration... proposed Quartzsite Solar Energy Project (Project) in La Paz County, near Quartzsite, Arizona. Quartzsite Solar Energy, LLC (QSE) has applied to Western to interconnect the proposed Project to Western's power...

  3. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  4. 78 FR 28842 - Searchlight Wind Energy Project Record of Decision (DOE/EIS-0413)

    Science.gov (United States)

    2013-05-16

    ... DEPARTMENT OF ENERGY Western Area Power Administration Searchlight Wind Energy Project Record of...), received a request from Searchlight Wind Energy, LLC (Searchlight) to interconnect its proposed Searchlight Wind Energy Project (Project) to Western's Davis-Mead 230- kilovolt (kV) transmission line. The Project...

  5. 76 FR 78916 - Rice Solar Energy Project Record of Decision (DOE/EIS-0439)

    Science.gov (United States)

    2011-12-20

    ... DEPARTMENT OF ENERGY Western Area Power Administration Rice Solar Energy Project Record of...: Western Area Power Administration (Western) received a request from Rice Solar Energy, LLC (RSE) to interconnect its proposed Rice Solar Energy Project (Project) to Western's Parker-Blythe No. 2 Transmission...

  6. 78 FR 28841 - Quartzsite Solar Energy Project Record of Decision (DOE/EIS-0440)

    Science.gov (United States)

    2013-05-16

    ... DEPARTMENT OF ENERGY Western Area Power Administration Quartzsite Solar Energy Project Record of...), received a request from Quartzsite Solar Energy, LLC (QSE) to interconnect its proposed Quartzsite Solar... (PRMPA) for Quartzsite Solar Energy Project was published in the Federal Register (77 FR 75632). After...

  7. 75 FR 39926 - Deer Creek Station Energy Facility Project (DOE/EIS-0415)

    Science.gov (United States)

    2010-07-13

    ... when wind energy is not available. Water resources concerns are related to erosion and sedimentation... withdrawal at Project start-up to fill the on-site water storage tank. Monitoring will take place at least...

  8. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-90) - Naches River Water Treatment Plant Intake Screening Project

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Shannon C. [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-09-26

    BPA is proposing to fund the upgrade of the intake structure for the City of Yakima’s Water Treatment Plant. The existing traveling water screen at the intake does not achieve the current fish screening criteria as defined by Washington State Law and as provided in guidance from the National Marine Fisheries Service. Permanent modifications to the intake system including installation of a fish screen and bypass system are necessary to eliminate mortality and take of ESA listed and non-listed salmonids, as well as resident fish at this location. This project will include: modifications to bypass the existing intake system; the construction of a new intake structure with approved fish screens; installation of a 48-inch diameter pipeline connecting the new intake to the existing intake structure; a reduced intake channel separating PacifiCorp Powerhouse return water/ Naches River water from the irrigation and Wapatox waste ditch return water; modifications to the auxiliary headgates; increased height on the upstream end of the channel wall; and a new outfall structure with plunge pool and upstream migrant barriers.

  9. 75 FR 2138 - Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming (DOE/EIS-0438)

    Science.gov (United States)

    2010-01-14

    ... in accordance with the National Environmental Policy Act of 1969 (NEPA), U.S. Department of Energy... Open Access Transmission Service Tariff (Tariff). This EIS will address Western's Federal action of..., Office of NEPA Policy and Compliance, GC-54, U.S. Department of Energy, 1000 Independence Avenue, SW...

  10. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of... one or more phases, dependent on one or more power sale contracts. The proposed wind park would... that limit construction vehicle speed limits. Foresight indicated that the wind park contractor will...

  11. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  12. 78 FR 17653 - Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS-0408)

    Science.gov (United States)

    2013-03-22

    ... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654

  13. DOE Robotics Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  14. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  15. DOE Energy Challenge Project

    Energy Technology Data Exchange (ETDEWEB)

    Frank Murray; Michael Schaepe

    2009-04-24

    Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOE’s interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

  16. 76 FR 21401 - Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM

    Science.gov (United States)

    2011-04-15

    ...] Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM AGENCY... prepared a Draft Environmental Impact Statement (EIS) for the HB In- Situ Solution Mine Project, and by... considered, the BLM must receive written comments on the HB In-Situ Solution Mine Project Draft EIS within 60...

  17. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Final EIR/EIS

    International Nuclear Information System (INIS)

    1994-01-01

    On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments

  18. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Science.gov (United States)

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  19. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS: Executive summary

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level

  20. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2)

    Energy Technology Data Exchange (ETDEWEB)

    Barndt, Shawn L. [Bonneville Power Administration, Portland, OR (United States)

    2003-04-04

    Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways

  1. DOE EiR at Oakridge National Lab 2008/09

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, Michael

    2012-11-30

    This project placed an experienced technology entrepreneur at Oak Ridge National Lab, one of DOE's premier laboratories undertaking cutting edge research in a variety of fields, including energy technologies. With the goal of accelerating the commercialization of advanced energy technologies, the task was to review available technologies at the lab and identify those that qualify for licensing and commercialization by a private startup company, backed by private venture capital. During the project, more than 1,500 inventions filed at the lab were reviewed over a 1 year period; a successively smaller number was selected for more detailed review, ultimately resulting in five, and then 1 technology, being reviewed for immediate commercialization. The chosen technology, consisting in computational chemistry based approached to optimization of enzymes, was tested in lab experiments, paid for by funds raised by ORNL for the purpose of proving out the effectiveness of the technology and readiness for commercialization. The experiments proved out that the technology worked however it's performance proved not yet mature enough to qualify for private venture capital funded commercialization in a high tech startup. As a consequence, the project did not result in a new startup company being formed, as originally intended.

  2. Final environmental impact statement, interim management of nuclear materials, Savannah River Site, Aiken, South Carolina (DOE/EIS-0220)

    Energy Technology Data Exchange (ETDEWEB)

    Grainger, A R

    1995-10-01

    This document evaluates the potential environmental impacts of alternatives for the stabilization of nuclear materials currently stored at various locations on the Savannah River Site (SRS). These materials remain from past defense-related production, testing, and other activities at the SRS and from chemical separations and related activities that DOE suspended in 1992. The EIS analyzes the following alternatives: Continuing Storage (No Action), Processing to Metal, Processing to Oxide, Blending Down to Low Enriched Uranium, Processing and Storage for Vitrification in the Defense Waste Processing Facility, Vitrification (F-Canyon), and Improving Storage. The preferred alternatives cover a combination of these in relation to the different types of material.

  3. Why does self-reported emotional intelligence predict job performance? A meta-analytic investigation of mixed EI.

    Science.gov (United States)

    Joseph, Dana L; Jin, Jing; Newman, Daniel A; O'Boyle, Ernest H

    2015-03-01

    Recent empirical reviews have claimed a surprisingly strong relationship between job performance and self-reported emotional intelligence (also commonly called trait EI or mixed EI), suggesting self-reported/mixed EI is one of the best known predictors of job performance (e.g., ρ = .47; Joseph & Newman, 2010b). Results further suggest mixed EI can robustly predict job performance beyond cognitive ability and Big Five personality traits (Joseph & Newman, 2010b; O'Boyle, Humphrey, Pollack, Hawver, & Story, 2011). These criterion-related validity results are problematic, given the paucity of evidence and the questionable construct validity of mixed EI measures themselves. In the current research, we update and reevaluate existing evidence for mixed EI, in light of prior work regarding the content of mixed EI measures. Results of the current meta-analysis demonstrate that (a) the content of mixed EI measures strongly overlaps with a set of well-known psychological constructs (i.e., ability EI, self-efficacy, and self-rated performance, in addition to Conscientiousness, Emotional Stability, Extraversion, and general mental ability; multiple R = .79), (b) an updated estimate of the meta-analytic correlation between mixed EI and supervisor-rated job performance is ρ = .29, and (c) the mixed EI-job performance relationship becomes nil (β = -.02) after controlling for the set of covariates listed above. Findings help to establish the construct validity of mixed EI measures and further support an intuitive theoretical explanation for the uncommonly high association between mixed EI and job performance--mixed EI instruments assess a combination of ability EI and self-perceptions, in addition to personality and cognitive ability. PsycINFO Database Record (c) 2015 APA, all rights reserved.

  4. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (July 2005)

    International Nuclear Information System (INIS)

    2005-01-01

    The U.S. Department of Energy (DOE or the Department) is proposing to clean up surface contamination and implement a ground water compliance strategy to address contamination that resulted from historical uranium-ore processing at the Moab Uranium Mill Tailings Site (Moab site), Grand County, Utah. Pursuant to the National Environmental Policy Act (NEPA), 42 United States Code (U.S.C.) (section) 4321 et seq., DOE prepared this environmental impact statement (EIS) to assess the potential environmental impacts of remediating the Moab site and vicinity properties (properties where uranium mill tailings were used as construction or fill material before the potential hazards associated with the tailings were known). DOE analyzed the potential environmental impacts of both on-site and off-site remediation and disposal alternatives involving both surface and ground water contamination. DOE also analyzed the No Action alternative as required by NEPA implementing regulations promulgated by the Council on Environmental Quality. DOE has determined that its preferred alternatives are the off-site disposal of the Moab uranium mill tailings pile, combined with active ground water remediation at the Moab site. The preferred off-site disposal location is the Crescent Junction site, and the preferred method of transportation is rail. The basis for this determination is discussed later in this Summary. DOE has entered into agreements with 12 federal, tribal, state, and local agencies to be cooperating agencies in the development and preparation of this EIS. Several of the cooperating agencies have jurisdiction by law and intend to use the EIS to support their own decisionmaking. The others have expertise relevant to potential environmental, social, or economic impacts within their geographic regions. During the preparation of the EIS, DOE met with the cooperating agencies, provided them with opportunities to review preliminary versions of the document, and addressed their comments

  5. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 2 of 2: Appendices

    International Nuclear Information System (INIS)

    1994-01-01

    The Southeast Regional Wastewater Treatment Plant (SERWTP) Facilities Improvement Plan and Geysers Effluent Pipeline and Effluent Injection Project are proposed as a plan to provide expanded wastewater treatment capabilities and to dispose of the effluent by injection in The Geysers geothermal field for purposes of power production. The project is located predominantly in the County of Lake, California, and also in part of Sonoma County. The plan includes various conventional facilities improvements in wastewater treatment to a secondary level of treatment at the SWERWTP. The plan includes facilities to convey the treated effluent in a 26-mile, 24-inch inside diameter pipeline to the Southeast Geysers. The wastewater from the SERWTP would be supplemented by raw lake water diverted from nearby Clear Lake. At The Geysers, the effluent would be directed into a system of distribution lines to wells. In the geothermal reservoir, the water will be converted to steam and collected in production wells that will direct the steam to six existing power plants. This document is a summary of a combined full Environmental Impact Report (EIR) and Environmental Impact Statement (EIS). The EIR/EIS describes the environmental impacts of the various components of the project. Mitigation measures are suggested for reducing impacts to a less than significant level. This report contains appendices A and B. Appendix A contains notices of preparation/notices of intent and EIR/EIS scoping comments. Appendix B contains GeothermEx, Inc., analysis of Geothermal Reservoir Effects and Induced Seismicity

  6. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  7. 77 FR 74470 - Intent to Prepare an Environmental Impact Statement (EIS) for the Donlin Gold Project

    Science.gov (United States)

    2012-12-14

    ... impacts associated with the proposed Donlin Gold Project, which would be an open pit, hardrock gold mine... proposing the development of an open pit, hardrock gold mine located 277 miles west of Anchorage, 145 miles.... Major project components include excavation of an open pit, that ultimately would be approximately 2.2...

  8. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  9. Tidd PFBC Demonstration Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  10. Healy Clean Coal Project: A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2003-09-01

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict

  11. 75 FR 60102 - South Dakota PrairieWinds Project (DOE/EIS-0418)

    Science.gov (United States)

    2010-09-29

    ... generation facility that would feature 101 wind turbine generators; 6,000 square-foot operations and... feature 101 wind turbine generators; 6,000 square-foot operations and maintenance building and fence... Alternative, bird fatalities are expected to be low compared with other wind facilities around the United...

  12. Review of the draft supplement to the WIPP environmental impact statement DOE/EIS-0026-S-2

    International Nuclear Information System (INIS)

    Neill, R.H.; Channell, J.K.; Spiegler, P.; Chaturvedi, L.

    1997-04-01

    New Mexico Environmental Evaluation Group's (EEG) review of the WIPP Disposal Phase Draft Supplemental Environmental Impact Statement (SEIS-II) concentrated on the radiological aspects of the Proposed Action, including transportation. The alternatives were reviewed in less detail. Some calculations were checked, mostly for the Proposed Action. Because of time constraints, there was little review of Hazardous Chemicals, Economics, or other Environmental Assessments. SEIS-II was written as a pre-decision document with the Alternatives all plausible and eligible to be selected. Also, the inventory of TRU waste for disposal went well beyond that portion of TRU waste that has been historically considered to be the WIPP inventory. This broadened scope is probably appropriate for an EIS but it is confusing to the reviewer who is aware of the statutory limits of wastes that are allowed to come to WIPP at the present time. EEG has attempted to keep the broadened scope of SEIS-II in mind during their review. The more important issues discussed within are: alternatives; related documents; transportation; questionable assumptions; use of the 75th percentile values; family farm scenario and inhalation doses; modification of BRAGFLO volumes; emplacement of remotely handled TRU wastes; conversion error; and remotely handled TRU casks

  13. USING A DOE AND EIS TO EVALUATE THE SYNERGISTIC EFFECTS OF LOW TOXICITY INHIBITORS FOR MILD STEEL

    Directory of Open Access Journals (Sweden)

    G. V. Bueno

    2015-03-01

    Full Text Available Abstract Inhibitors are widely used to prevent corrosion in cooling-water systems, and their protective performance can be enhanced by combination. The aim of this paper is to identify possible synergistic effects between four low toxicity substances used as corrosion inhibitors for mild steel in industrial cooling-water systems. Electrochemical measurements were obtained following a design of experiments (DOE where the independent variables were the inhibitors concentrations and the response variable the charge transfer resistance estimated from impedance diagrams. Potentiodynamic polarization curves show that all of them act as anodic corrosion inhibitors. Among the tested formulations, only the interaction between sodium molybdate and sodium tungstate showed statistically significant effects, indicating that they can perform better when used together. The results of this work show the importance of using a statistical tool when designing inhibitor mixtures.

  14. The Nagra-DOE Cooperative Project

    International Nuclear Information System (INIS)

    Long, J.C.S.; Levich, R.A.; Zuidema, P.

    1993-01-01

    The Nagra-DOE Cooperative (NDC-I) research program was sponsored by the US DOE through the Lawrence Berkeley Laboratory (LBL), and the Swiss Nationale Genossenschaft fuer die Lagerung radioaktiver Abfaella (Nagra). Scientists participating in this project explored the geological, geophysical, hydrological, geochemical, and structural effects anticipated from the use of a rock mass as a geologic repository for nuclear waste. Six joint tasks were defined and are described briefly. Task 1: Determination of fracture hydraulic parameters by means of fluid-logging in boreholes. Task 2: Development and application of new solutions for well test analysis in fractured media. Task 3: Interdisciplinary methodology for characterizing fracture hydrology. Task 4: Investigation of two-phase gas-liquid flow in fractured media. Task 5: Underground rock laboratory studies. Task 6:Coupling of transport and geochemistry. Tasks 1, 2, 3, and 5 were concerned with the characterization of fractured rock. Task 5 in particular was focused on investigations at the Grimsel Underground Lab. in the Swiss Alps. Tasks 2 and 6 focused on the phenomenology associated with storing radioactive waste underground. The accomplishments of the six tasks are summarized

  15. Radiological health review of the Draft Environmental Impact Statement (DOE/EIS-0026-D) Waste Isolation Pilot Plant, US Department of Energy. Report EEG-3

    International Nuclear Information System (INIS)

    Neill, R.H.; Channell, J.K.; Wofsy, C.; Greenfield, M.A.

    1979-08-01

    This review of radiological health considerations contains a number of concerns, questions and recommendations that should be addressed by the Department of Energy in the final Environmental Impact Statement (EIS) for the Waste Isolation Pilot Plant (WIPP). Using the assumptions contained in the Draft Environmental Impact Statement (DEIS), the Environmental Evaluation Group (EEG) calculated a number of radiation doses and the results were found to be in general agreement with those presented in the DEIS. The doses resulting from the operational and long-range releases from WIPP to the general population are no more than a fraction of existing radiation doses to the public. However, there are a number of technical considerations in the assessment of radiation exposure that were not adequately evaluated in the DEIS. They are discussed in this review. A number of additional dosage estimates have been identified that need to be calculated by both DOE and EEG. As the DEIS did not contain estimates of the amounts of radioactivity to be permanently located in the repository, it was necessary to calculate these amounts. Health effects, transportation, waste acceptance criteria, site evaluation, site selection criteria, operational exposure, the experimental waste program, long term radiation releases, retrievability, and decommissioning are the categories of the DEIS which were evaluated

  16. DOE Project on Heavy Vehicle Aerodynamic Drag

    Energy Technology Data Exchange (ETDEWEB)

    McCallen, R; Salari, K; Ortega, J; Castellucci, P; Pointer, D; Browand, F; Ross, J; Storms, B

    2007-01-04

    Class 8 tractor-trailers consume 11-12% of the total US petroleum use. At highway speeds, 65% of the energy expenditure for a Class 8 truck is in overcoming aerodynamic drag. The project objective is to improve fuel economy of Class 8 tractor-trailers by providing guidance on methods of reducing drag by at least 25%. A 25% reduction in drag would present a 12% improvement in fuel economy at highway speeds, equivalent to about 130 midsize tanker ships per year. Specific goals include: (1) Provide guidance to industry in the reduction of aerodynamic drag of heavy truck vehicles; (2) Develop innovative drag reducing concepts that are operationally and economically sound; and (3) Establish a database of experimental, computational, and conceptual design information, and demonstrate the potential of new drag-reduction devices. The studies described herein provide a demonstration of the applicability of the experience developed in the analysis of the standard configuration of the Generic Conventional Model. The modeling practices and procedures developed in prior efforts have been applied directly to the assessment of new configurations including a variety of geometric modifications and add-on devices. Application to the low-drag 'GTS' configuration of the GCM has confirmed that the error in predicted drag coefficients increases as the relative contribution of the base drag resulting from the vehicle wake to the total drag increases and it is recommended that more advanced turbulence modeling strategies be applied under those circumstances. Application to a commercially-developed boat tail device has confirmed that this restriction does not apply to geometries where the relative contribution of the base drag to the total drag is reduced by modifying the geometry in that region. Application to a modified GCM geometry with an open grille and radiator has confirmed that the underbody flow, while important for underhood cooling, has little impact on the drag

  17. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  18. DOE Robotics Project. Summary of progress for 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This document provide the bimonthly progress reports on the Department of Energy (DOE) Robotics Project by the University of Michigan. Reports are provided for the time periods of December 90/January 91 through June 91/July 91. (FI)

  19. Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. Draft EIR/EIS, Volume 1 of 2

    International Nuclear Information System (INIS)

    1994-01-01

    The primary focus of this environmental analysis is on improvements to the Southeast Regional Wastewater Treatment Plant (SRWTP) facilities and disposal to the Geysers for injection. This analysis will be incorporated with an earlier EIR which evaluated system improvements to the SRWTP and twelve disposal alternatives. In July 1993, the Lake County Sanitation District Board of Directors (LACOSAN) selected the Geysers Effluent Pipeline as the preferred alternative to be analyzed in this EIR/EIS. This environmental analysis will primarily focus on improvements to the SRWTP facilities and a 24 inch pipeline designed to carry up to 5,400 gallons per minute of secondarily treated wastewater. The wastewater will be transported from the Lake County Sanitation District's Southeast Regional Wastewater Treatment Plant, Middletown Wastewater Treatment Plant with additional make-up water from Clear Lake to the Southeast portion of the Geysers Geothermal Field in Lake and Sonoma Counties, California

  20. DOE awards first economic conversion project at Rocky Flats

    International Nuclear Information System (INIS)

    Lobsenz, G.

    1993-01-01

    In the first economic conversion project at an Energy Department weapons facility, a Colorado company this week was given permission to refurbish four buildings at DOE's Rocky Flats plant to recycle slightly radioactive scrap metal. DOE, acting in conjunction with the Environmental Protection Agency and Colorado authorities, announced Tuesday it had given the go-ahead to Manufacturing Sciences Corp. of Golden, Colorado, to proceed with planning for the project

  1. Recycling entire DOE facilities: The National Conversion Pilot Project

    International Nuclear Information System (INIS)

    Floyd, D.R.

    1996-01-01

    The Mission of the National Conversion Pilot Project - to demonstrate, at the Rocky Flats Site, the feasibility of economic conversion of DOE Sites - is succeeding. Contaminated facilities worth $92 million are being cleaned and readied for reuse by commercial industry to manufacture products needed in the DOE cleanup and elsewhere. Former Rocky Flats workers have been hired, recultured, are conducting the cleanup and are expected to perform the future manufacturing by recycling DOE RSM and other metals requiring special environmental controls. Stakeholder sway over project activities is welcome and strong

  2. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  3. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  4. 2018 DOE Solid-State Lighting Project Portfolio

    Energy Technology Data Exchange (ETDEWEB)

    None

    2018-01-31

    The 2018 Solid-State Lighting Project Portfolio provides an overview of all SSL projects that have been funded by DOE since 2000. Projects that were active during 2017 are found in the main body of this report, and all historic projects can be found in the appendix. Within these sections, project profiles are sorted by technology type (i.e., LED or OLED) and then by performer name. A profile is provided on each project. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually, although the research described in the Portfolio changes periodically as new projects are initiated and existing ones are concluded.

  5. Ei viitsi! / Aado Luik

    Index Scriptorium Estoniae

    Luik, Aado, 1937-

    2002-01-01

    Põhjus-tagajärg diagramm (Ishikawa diagramm) annab piltliku ülevaate põhjustest, miks õpilased ei viitsi õppida. Pareto diagramm kajastab näitlikult erinevate põhjuste osa halva tagajärje kujunemises

  6. Explanation of Significant Differences Between Models used to Assess Groundwater Impacts for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and Greater-Than-Class C-Like Waste Environmental Impact Statement (DOE/EIS-0375-D) and the

    Energy Technology Data Exchange (ETDEWEB)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-08-01

    Models have been used to assess the groundwater impacts to support the Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE-EIS 2011) for a facility sited at the Idaho National Laboratory and the Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project (INL 2011). Groundwater impacts are primarily a function of (1) location determining the geologic and hydrologic setting, (2) disposal facility configuration, and (3) radionuclide source, including waste form and release from the waste form. In reviewing the assumptions made between the model parameters for the two different groundwater impacts assessments, significant differences were identified. This report presents the two sets of model assumptions and discusses their origins and implications for resulting dose predictions. Given more similar model parameters, predicted doses would be commensurate.

  7. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  8. PNC/DOE Remote Monitoring Project at Japan's Joyo Facility

    International Nuclear Information System (INIS)

    Ross, M.; Hashimoto, Yu; Sonnier, C.; Dupree, S.; Ystesund, K.; Hale, W.

    1996-01-01

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan and the US Department of Energy (DOE) are cooperating on the development of a remote monitoring system for nuclear nonproliferation efforts. This cooperation is part of a broader safeguards agreement between PNC and DOE. A remote monitoring system is being installed in a spent fuel storage area at PNC's experimental reactor facility Joyo in Oarai. The system has been designed by Sandia National Laboratories (SNL) and is closely related to those used in other SNL remote monitoring projects. The Joyo project will particularly study the unique aspects of remote monitoring in contribution to nuclear nonproliferation. The project will also test and evaluate the fundamental design and implementation of the remote monitoring system in its application to regional and international safeguards efficiency. This paper will present a short history of the cooperation, the details of the monitoring system and a general schedule of activities

  9. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  10. The ENCOAL Mild Coal Gasification Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2002-03-15

    This report is a post-project assessment of the ENCOAL{reg_sign} Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL{reg_sign} Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL{reg_sign} mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL{reg_sign} was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL{reg_sign} was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of $90,664,000. ENCOAL{reg_sign} operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC{trademark}) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF{trademark}) and Coal-Derived Liquids (CDL{trademark}). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall

  11. The ENCOAL Mild Coal Gasification Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    This report is a post-project assessment of the ENCOAL(reg s ign) Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL(reg s ign) Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL(reg s ign) mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL(reg s ign) was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL(reg s ign) was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of$90,664,000. ENCOAL(reg s ign) operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC(trademark)) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF(trademark)) and Coal-Derived Liquids (CDL(trademark)). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall

  12. Global EiBI-monopole

    Directory of Open Access Journals (Sweden)

    JIN Xinghua

    2014-04-01

    Full Text Available A global EiBI-monopole problem is studied under EiBI gravitational theory.The equations of global EiBI-monopole are derived in the curved spacetime and the relation between the spacetime metric and auxiliary metric is found.In the case of a very small parameter,an asymptotic form of equations is given.The series solutions of global EiBI-monopole at infinity are found.

  13. Engineering Information System (EIS)

    Science.gov (United States)

    1992-01-31

    be availabe and usefu for creating powerful tailored contro and mangeen functions. Mode and Framwork Wirth further elaboration of the EIS portio of...control data and activities of the engineering process. The EIM is a conceptual model of administrative and electroic design information. It records...of the access opeations are derived from the instance variable name and type. An attribute conceptually holds one or more instances of a basic type

  14. Final Report for DOE Project: Portal Web Services: Support of DOE SciDAC Collaboratories

    Energy Technology Data Exchange (ETDEWEB)

    Mary Thomas, PI; Geoffrey Fox, Co-PI; Gannon, D; Pierce, M; Moore, R; Schissel, D; Boisseau, J

    2007-10-01

    Grid portals provide the scientific community with familiar and simplified interfaces to the Grid and Grid services, and it is important to deploy grid portals onto the SciDAC grids and collaboratories. The goal of this project is the research, development and deployment of interoperable portal and web services that can be used on SciDAC National Collaboratory grids. This project has four primary task areas: development of portal systems; management of data collections; DOE science application integration; and development of web and grid services in support of the above activities.

  15. NASA/DOE automotive Stirling engine project: Overview 1986

    Science.gov (United States)

    Beremand, D. G.; Shaltens, R. K.

    1986-01-01

    The DOE/NASA Automotive Stirling Engine Project is reviewed and its technical progress and status are presented. Key technologies in materials, seals, and piston rings are progressing well. Seven first-generation engines, and modifications thereto, have accumulated over 15,000 hr of test time, including 1100hr of in-vehicle testing. Results indicate good progress toward the program goals. The first second-generation engine is now undergoing initial testing. It is expected that the program goal of a 30-percent improvement in fuel economy will be achieved in tests of a second-generation engine in a Celebrity vehicle.

  16. Mississippi graduate DOE EPSCor trainee project. First annual summary report

    Energy Technology Data Exchange (ETDEWEB)

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  17. Mississippi graduate DOE EPSCor trainee project. [First Annual Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  18. Overview of DOE Oil and Gas Field Laboratory Projects

    Science.gov (United States)

    Bromhal, G.; Ciferno, J.; Covatch, G.; Folio, E.; Melchert, E.; Ogunsola, O.; Renk, J., III; Vagnetti, R.

    2017-12-01

    America's abundant unconventional oil and natural gas (UOG) resources are critical components of our nation's energy portfolio. These resources need to be prudently developed to derive maximum benefits. In spite of the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells is not known. In addition, there is the dire need of a comprehensive understanding of ways to improve the recovery of shale gas with little or no impacts on the environment. Research that seeks to expand our view of effective and environmentally sustainable ways to develop our nation's oil and natural gas resources can be done in the laboratory or at a computer; but, some experiments must be performed in a field setting. The Department of Energy (DOE) Field Lab Observatory projects are designed to address those research questions that must be studied in the field. The Department of Energy (DOE) is developing a suite of "field laboratory" test sites to carry out collaborative research that will help find ways of improving the recovery of energy resources as much as possible, with as little environmental impact as possible, from "unconventional" formations, such as shale and other low permeability rock formations. Currently there are three field laboratories in various stages of development and operation. Work is on-going at two of the sites: The Hydraulic Fracturing Test Site (HFTS) in the Permian Basin and the Marcellus Shale Energy and Environmental Lab (MSEEL) project in the Marcellus Shale Play. Agreement on the third site, the Utica Shale Energy and Environmental Lab (USEEL) project in the Utica Shale Play, was just recently finalized. Other field site opportunities may be forthcoming. This presentation will give an overview of the three field laboratory projects.

  19. Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-110-Covington-Columbia No. 3

    Energy Technology Data Exchange (ETDEWEB)

    Hermeston, Mark W. [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-10-02

    Vegetation Management along the Covington-Columbia No. 3, 230kV transmission lines from structure 1/1 through structure 12/1. Corridor width varies from 150 feet to 537.5 feet. The project area is located within King County, Washington. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 568.4 acres of the right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See Section 1 of the attached checklist for a complete description of the proposal.

  20. ND-REAP/DOE cooperative project: final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The impacts of energy-related developments in North Dakota are having profound effects on the state. Among the most significant of these effects are those on the state's economy and its population. Knowledge of the total environmental effects of development is a necessary prerequisite for effective planning and decision making. This final report addresses the conceptual design and functional evolution of the Regional Environmental Assessment Program, the results of the REAP/DOE Cooperative Effort, as well as evolution of the REAP/DOE effort and recommendations for future directions. The Economic Demographic (E-D) Model was developed to give North Dakota decision makers a tool with which to evaluate the impacts of coal development. It projects social, economic, and characteristics of North Dakota. Refinements and expansion of the model are discussed in Section 1. Section 2 provides an evaluation of the model as applied to other states. Section 3 identifies and evaluates the use of REAP data and capabilities to date. The REAP Resources Reference System R/sup 3/S was developed to provide access to information systems and to past research and present studies about aspects of North Dakota. It is a computer-based library reference system. Its status and expansion potential is covered in Section 4. Section 5 makes recommendations for future efforts.

  1. Overview of DOE/ONS criticality safety projects

    International Nuclear Information System (INIS)

    Barber, R.W.; Brown, B.P.; Hopper, C.M.

    1985-01-01

    The evolution of Federal involvement with nuclear criticality safety has traversed through the 1940's and early 1950's with the Manhattan Engineering District, the 1950's and 1960's with the Atomic Energy Commission, the early 1970's with the Energy Research and Development Administration, and the late 1970's to date with the US Department of Energy. The importance of nuclear criticality safety has been maintained throughout these periods; however, criticality safety has received shifting emphases in research/applications, promulgations of regulations/standards, origins of fiscal support and organization. In June 1981 the Office of Nuclear Safety was established in response to a Department of Energy study of the impact of the March 1979 Three Mile Island accident. The organizational structure of the ONS, its program for establishing and maintaining a progressive nuclear criticality safety program, and associated projects, and current history of ONS's fiscal support of program projects is presented. With the establishment of the ONS came concomitant missions to develop and maintain nuclear safety policy and requirements, to provide independent assurance that nuclear operations are performed safely, to provide resources and management for DOE responses to nuclear accidents, and to provide technical support. In the past four years, ONS has developed and initiated a continuing Department Nuclear Criticality Safety Program in such areas as communications and information, physics of criticality, knowledge of factors affecting criticality, and computational capability

  2. Recommendations for an Executive Information System (EIS) for the NASA Accounting and Financial Information System (NAFIS)

    Science.gov (United States)

    Goss, Ernest Preston

    1991-01-01

    The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.

  3. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE No. 98-D-453

    International Nuclear Information System (INIS)

    HOLSTEIN, W.A.

    1999-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, WA., currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration. Use of this document is described in the Project Hanford Policy and Procedure System under HNF-PRO-1999, Construction Program Conceptual Phase

  4. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    International Nuclear Information System (INIS)

    MCGRATH, G.M.

    2000-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration

  5. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  6. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  7. Climatic Changes and Evaluation of Their Effects on Agriculture in Asian Monsoon Region- A project of GRENE-ei programs in Japan

    Science.gov (United States)

    Mizoguchi, M.; Matsumoto, J.; Takahashi, H. G.; Tanaka, K.; Kuwagata, T.

    2015-12-01

    It is important to predict climate change correctly in regional scale and to build adaptation measures and mitigation measures in the Asian monsoon region where more than 60 % of the world's population are living. The reliability of climate change prediction model is evaluated by the reproducibility of past climate in general. However, because there are many developing countries in the Asian monsoon region, adequate documentations of past climate which are needed to evaluate the climate reproducibility have not been prepared. In addition, at present it is difficult to get information on wide-area agricultural meteorological data which affect the growth of agricultural crops when considering the impact on agriculture of climate. Therefore, we have started a research project entitled "Climatic changes and evaluation of their effects on agriculture in Asian monsoon region (CAAM)" under the research framework of the Green Network of Excellence (GRENE) for the Japanese fiscal years from 2011 to 2015 supported by the Japanese Ministry of Education, Culture, Sports, Science and Technology (MEXT). This project aims to improve the reliability of future climate prediction and to develop the information platform which will be useful to design adaptation and mitigation strategies in agriculture against the predicted climatic changes in Asian monsoon regions. What is GRENE?Based on the new growth strategy which was approved by the Cabinet of Japan in June 2010, Green Network of Excellence program (GRENE) has started under MEXT from FY 2011. The objectives of this program are that the domestic leading universities work together strategically and promote a comprehensive human resource development and research of the highest level in the world while sharing research resources and research goals. In the field of environmental information, it is required that universities and research institutions, which are working on issues such as adaptation to climate change, cooperate to

  8. Erapooletuid ei olnud / Reet Roos

    Index Scriptorium Estoniae

    Roos, Reet, 1973-

    2006-01-01

    Menetlusest langes välja eelnõu, mille mõte oli, et riik tagaks elatise lapsele, kelle ühelt vanemalt on elatis kohtulikult välja mõistetud, kuid kes seda ise maksta ei taha või ei saa. Sama ka Koit 23. mai 2006, lk. 6 ; Valgamaalane 23. mai 2006, lk. 2 ; Järva Teataja 23. mai 2006, lk. 2 ; Elva Postipoiss 20. mai 2006, lk. 2 ; Vooremaa 16. mai 2006, lk. 2 ; Vali Uudised 17. mai 2006, lk. 2 ; Nädaline 16. mai 2006, lk. 2

  9. 77 FR 26025 - Notice of Intent To Prepare a Environmental Impact Statement (EIS) for the HOPE SF Development at...

    Science.gov (United States)

    2012-05-02

    ... a Environmental Impact Statement (EIS) for the HOPE SF Development at Potrero Terrace and Potrero... Statement (EIR/EIS) for the HOPE SF Development at the Potrero Terrace and Potrero Annex Public Housing Development (Potrero HOPE SF Master Plan Project). The EIR/EIS will be a joint National Environmental Policy...

  10. How does technological regime affect performance of technology development projects?

    NARCIS (Netherlands)

    Song, Michael; Hooshangi, Soheil; Zhao, Y. Lisa; Halman, Johannes I.M.

    2014-01-01

    In this study, we examine how technological regime affects the performance of technology development projects (i.e., project quality, sales, and profit). Technological regime is defined as the set of attributes of a technological environment where the innovative activities of firms take place.

  11. GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.N.

    1994-04-15

    Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

  12. DOE outfits two laboratories for particle-physics project

    CERN Multimedia

    Hampton, T

    2003-01-01

    Scheduled for operation in early 2005, a new facility will help researchers study elusive subatomic neutrinos by projecting a particle stream from Illinois to Minnesota - through 460 miles of solid earth (1 page).

  13. President ei pruugi uuesti kandideerida

    Index Scriptorium Estoniae

    2006-01-01

    Proua Ingrid Rüütel viitas Kanal 2 uudistesaates "Reporter" võimalusele, et Arnold Rüütel enam uueks ametiajaks ei kandideeri. Ilmunud ka Eesti Päevaleht, 2006/Mar/1, lk. 5 ; Koit, 2006/Mar/2, lk. 2

  14. Mississippi graduate trainee project for DOE EPSCoR. Summary report for year No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Wertz, D.L.

    1993-10-01

    Three research clusters were selected for emphasis in the Mississippi DOE EPSCoR project: Fossil fuel pollutants, enhanced oil recovery, and power systems and conservation. Brief progress reports are given.

  15. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  16. EL : Iiri "ei" Lissaboni lepingut ei surmanud / Kaivo Kopli

    Index Scriptorium Estoniae

    Kopli, Kaivo

    2008-01-01

    Iirlased hääletasid Lissaboni lepingu vastu. EL-i välisministrite nõupidamisel Luksemburgis ütles Iiri välisminister, et rahva tahet tuleb austada. Enamik EL-i riike soovib, et lepingu ratifitseeriksid ka need riigid, kes pole veel seda teinud, Tšehhi asepeaministri Alexander Vondra on seisukohal, et riikidele ei tohi survet avaldada. Vt. samas: Pariis süüdistab juba Brüsselit

  17. Muutuv kommunikatsioon kultuuri ei ohusta / Annika Poldre

    Index Scriptorium Estoniae

    Poldre, Annika

    2011-01-01

    Tallinna Konverentside poolt Sokos Hotel Virus 28. aprillil 2011 korraldatud kommunikatsiooni aastakonverentsist "Muutuv kommunikatsioon: vana ei taha ja uut ei oska. Kuidas edasi?", kus esinesid Ahto Lobjakas, Priit Põiklik, Piia Tamm ja Marju Lauristin

  18. DOE Project 353: TAMS Prototype and production coupling alignment units

    Energy Technology Data Exchange (ETDEWEB)

    Field, K.V.

    1996-02-01

    TAMS is an electronic measurement system used to determine the alignment of turbine-generator shafts at the coupling interface. The displacement transducer is a strain gage based sensor mounted in a portable probe. The measurement system was experiencing zero input drift and temperature induced drift. This project endeavored to determine the source of these problems and to revise a unit to be returned to a customer, Baltimore Gas and Electric (BGE), within a period of five weeks.

  19. DOE Contribution to the 2015 US CLIVAR Project Office Budget

    Energy Technology Data Exchange (ETDEWEB)

    DeWeaver, Eric [National Science Foundation (NSF), Washington, DC (United States); Patterson, Michael [US CLIVAR Project Office (USCPO),Washington DC (United States)

    2017-05-10

    The primary goal of the US Climate Variability and Predictability (CLIVAR) Project Office is to enable science community planning and implementation of research to understand and predict climate variability and change on intraseasonal-to-centennial timescales, through observations and modeling with emphasis on the role of the ocean and its interaction with other elements of the Earth system, and to serve the climate community and society through the coordination and facilitation of research on outstanding climate questions.

  20. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  1. Does the projected pathway to global warming targets matter?

    Science.gov (United States)

    Bärring, Lars; Strandberg, Gustav

    2018-02-01

    Since the ‘Paris agreement’ in 2015 there has been much focus on what a +1.5 °C or +2 °C warmer world would look like. Since the focus lies on policy relevant global warming targets, or specific warming levels (SWLs), rather than a specific point in time, projections are pooled together to form SWL ensembles based on the target temperature rather than emission scenario. This study uses an ensemble of CMIP5 global model projections to analyse how well SWL ensembles represent the stabilized climate of global warming targets. The results show that the SWL ensembles exhibit significant trends that reflect the transient nature of the RCP scenarios. These trends have clear effect on the timing and clustering of monthly cold and hot extremes, even though the effect on the temperature of the extreme months is less visible. In many regions there is a link between choice of RCP scenario used in the SWL ensemble and climate change signal in the highest monthly temperatures. In other regions there is no such clear-cut link. From this we conclude that comprehensive analyses of what prospects the different global warming targets bring about will require stabilization scenarios. Awaiting such targeted scenarios we suggest that prudent use of SWL scenarios, taking their characteristics and limitations into account, may serve as reasonable proxies in many situations.

  2. Project chariot remediation - the use of DOE's observational approach for environmental restoration with elements of the new DOE safer approach

    International Nuclear Information System (INIS)

    Hopkins, A.; Stewart, C.; Cabble, K.

    1994-01-01

    The primary purpose of Project Chariot was to investigate the technical problems and assess the effect of the proposed harbor excavation using nuclear explosives in Alaska. However, no nuclear devices were brought to the Project Chariot site. Between 1959 and 1961 various environmental tests were conducted. During the course of these environmental studies, the U.S. Geological Survey (USGS) granted the use of up to 5 curies of radioactive material at the Chariot site in Cape Thompson, Alaska; however only 26 millicuries were ever actually used. The tests were conducted in 12 test plots which were later gathered together and were mixed with in situ-soils generating approximately 1,600 cubic feet of soil. This area was then covered with four feet of clean soil, creating a mound. In 1962, the site was abandoned. A researcher at the University of Alaska at Fairbanks obtained in formation regarding the tests conducted and the materials left at the Project Chariot site. In response to concerns raised through the publication of this information, it was decided by the Department of Energy (DOE) that total remediation of the mound be completed within the year. During the summer of 1993, IT Corporation carried out the assessment and remediation of the Project Chariot site using a streamlined approach to waste site decision making called the Observational Approach (OA), and added elements of the new DOE Streamlined Approach for Environmental Restoration (SAFER). This remediation and remediation approach is described

  3. DOE`s approach to groundwater compliance on the UMTRA project

    Energy Technology Data Exchange (ETDEWEB)

    Metzler, D. [Dept. of Energy, Washington, DC (United States); Gibb, J.P. [Geraghty and Miller, Inc. (United States); Glover, W.A. [Roy F. Weston, Inc. (United States)

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  4. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  5. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Adonizio, Mary Ann [Verdant Power Inc., New York, NY (United States); Corren, Dean [Verdant Power Inc., New York, NY (United States); Smith, Ron [Verdant Power Inc., New York, NY (United States); Colby, Jonathan [Verdant Power Inc., New York, NY (United States); Hernandez, Aaron [Verdant Power Inc., New York, NY (United States)

    2016-04-08

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  6. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  7. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  8. OpenEIS. Developer Guide

    Energy Technology Data Exchange (ETDEWEB)

    Lutes, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Neubauer, Casey C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Haack, Jereme N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Brandon J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Monson, Kyle E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Allwardt, Craig H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sharma, Poorva [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Akyol, Bora A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-03-31

    The Department of Energy’s (DOE’s) Building Technologies Office (BTO) is supporting the development of an open-source software tool for analyzing building energy and operational data: OpenEIS (open energy information system). This tool addresses the problems of both owners of building data and developers of tools to analyze this data. Building owners and managers have data but lack the tools to analyze it while tool developers lack data in a common format to ease development of reusable data analysis tools. This document is intended for developers of applications and explains the mechanisms for building analysis applications, accessing data, and displaying data using a visualization from the included library. A brief introduction to the visualizations can be used as a jumping off point for developers familiar with JavaScript to produce their own. Several example applications are included which can be used along with this document to implement algorithms for performing energy data analysis.

  9. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  10. Ameerika ei ole Jaapan / Michael Craig

    Index Scriptorium Estoniae

    Craig, Michael

    2002-01-01

    Kuidas Jaapani ärimees Minoru Isutani 1981. aastal ei arvestnud, et ameeriklased ei osta golfiklubi eluaegset liikmekaarti 750 000 dollari eest, ning kaotas USA kuulsaima Pebble Beachi golfiväljaku. Katkend raamatust "50 parimat ja halvimat tehingut läbi aegade"

  11. 32 CFR 989.20 - Final EIS.

    Science.gov (United States)

    2010-07-01

    ... limited to factual corrections and responses to comments, the proponent and EPF may, with the prior..., the EPF must submit the Draft EIS and all of the above documents, with a new cover sheet indicating... more extensive modifications are required, the EPF must prepare a preliminary final EIS incorporating...

  12. Deploying innovative technologies to improve DOE D ampersand D project baselines

    International Nuclear Information System (INIS)

    Rose, R.W.

    1997-05-01

    The insertion of innovative technologies to replace baseline technologies used in cost estimation and planning of DOE D ampersand D projects is considered a high risk endeavor by project and programmatic decision makers. It is almost always considered safer to go with the open-quotes devil you knowclose quotes than use a new or untried technology, methodology or system. The decision on the specific technology to be utilized to remediate a problem is often made months or years in advance of execution, and the highly proscriptive documentation of agreements necessary to obtain stakeholder and regulator approval of remedial plans is often counterproductive to considering improved technologies

  13. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    International Nuclear Information System (INIS)

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  14. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  15. 77 FR 40144 - Adoption of the Environmental Impact Statement (EIS) and Participation in the Section 106...

    Science.gov (United States)

    2012-07-06

    ...) obligations related to MTA's request for financing for the East Side Access project through the FRA Railroad... Statement (EIS) and Participation in the Section 106 Programmatic Agreement for the East Side Access Project... adoption and recirculation of the Final Environmental Impact Statement for the East Side Access Project and...

  16. 76 FR 21003 - Notice of Intent To Prepare a Programmatic Environmental Impact Statement (EIS) and Possible Land...

    Science.gov (United States)

    2011-04-14

    ... Prepare a Programmatic Environmental Impact Statement (EIS) and Possible Land Use Plan Amendments for... to prepare a Programmatic EIS for Allocation of Oil Shale and Tar Sands Resources on Lands... through local media, newsletters, and the project Web site at: http://blm.gov/st5c . The minutes and list...

  17. Kui õppimine ei edene / Tiia Lister

    Index Scriptorium Estoniae

    Lister, Tiia

    2006-01-01

    Soome Instituudis toimus 27. veebruaril õppepäev "Kui õppimine ei edene", et tutvustada, kuidas Soomes on nii riiklikul kui ka koolisisesel tasandil liigutud õpilasele kõige sobivama ja kasulikuma abistamisvormi otsingul

  18. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    International Nuclear Information System (INIS)

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  19. Combined environmental impacts from production and use of the products. An EIS-application project for refineries; Sammanvaegd miljoepaaverkan fraan produktion och anvaendning av produkterna. Ett MKB-tillaempningsprojekt foer raffinaderier

    Energy Technology Data Exchange (ETDEWEB)

    Kindbom, K; LoevbIad, G.; Stripple, H.

    2001-12-01

    At European refineries a change in production is planned in order to obtain better qualities of gasoline and diesel, from an environmental point of view. This change will, however, lead to higher emissions at the refineries. The present study of the combined effects of emissions at the refineries and the use of the products gives the opportunity for considering the entire system and gives a stronger positive signal than the traditional EIS would do. Three different methods were used: Net change in emissions to air; Exposure of men and ecosystems for air pollutants; and Exceeding norms and critical levels. The results for the Swedish refinery at Lysekil shows that the emissions from using the products are much higher than the emissions from the refinery for all cases studied. The net emissions from production and use of the products will be reduced for the new products compared to the present situation. Risks for exceeding norms and critical levels due to the changes at the refinery exist for emissions of sulfur and nitrogen oxides, but a lower background load will probably mean that the total future load will be reasonably close to the critical level in the area affected by the refinery. In the urban environment, reduced risks for exceeding the levels for benzen and low levels for toluene and xylene give greater advantages than the increased emissions of sulfur and nitrogen close to the refinery.

  20. 77 FR 39322 - Notice to Rescind the Notice of Intent to Prepare an Environmental Impact Statement (EIS...

    Science.gov (United States)

    2012-07-02

    ... to Prepare an Environmental Impact Statement (EIS), Kootenai County, ID AGENCY: Federal Highway... Federal Highway Administration (FHWA), in cooperation with Idaho Transportation Department (ITD... because congestion and safety concerns were rising within the project corridor and travel times for local...

  1. Effluent Information System (EIS) / Onsite Discharge Information System (ODIS): 1986 executive summary

    International Nuclear Information System (INIS)

    Watanabe, T.

    1987-09-01

    Department of Energy (DOE) data base systems aid DOE-Headquarters and Field Offices in managing the radioactive air and liquid effluents from DOE facilities. Data on effluents released offsite are entered into effluent information system (EIS) and data on effluents discharged onsite and retained onsite are entered into Onsite Discharge Information System (ODIS). This document is a summary of information obtained from the CY 1986 effluent data received from all DOE and DOE contractor facilities and entered in the data bases. Data from previous years are also included. The summary consists of information for effluents released offsite, and information for effluents retained onsite

  2. 7 CFR 650.20 - Reviewing and commenting on EIS's prepared by other agencies.

    Science.gov (United States)

    2010-01-01

    ... ensure the health and welfare of the agricultural community. Comments are to be based on knowledge...? What benefits are foregone if prime farmland is taken? (8) Impacts on ecosystems. Does the EIS describe impacts on major plant communities, and terrestrial and aquatic ecosystems? (9) Impacts on NRCS-assisted...

  3. National Centers for Environmental Prediction-Department of Energy (NCEP-DOE) Atmospheric Model Intercomparison Project (AMIP)-II Reanalysis (Reanalysis-2)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The NCEP-DOE Atmospheric Model Intercomparison Project (AMIP-II) reanalysis is a follow-on project to the "50-year" (1948-present) NCEP-NCAR Reanalysis Project....

  4. 1992 Columbia River salmon flow measures Options Analysis/EIS

    International Nuclear Information System (INIS)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described

  5. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.

  6. "Kurgibakter" ei tulnudki importkurgiga? / Kaivo Kopli

    Index Scriptorium Estoniae

    Kopli, Kaivo

    2011-01-01

    Nakkuspuhang Saksamaal ei pruugi olla põhjustatud Hispaaniast toodud kurkidest. Mitmed riigid on peatanud kurkide ja mõnede muude köögiviljade impordi Hispaaniast, Hispaania tahab nõuda Euroopa Komijonilt kompensatsiooni müümata jäänud köögiviljade eest

  7. Hispaania ei usu ETA rahupakkumisse / Heiki Suurkask

    Index Scriptorium Estoniae

    Suurkask, Heiki, 1972-

    2004-01-01

    Baski terrorirühmitus kutsus uut peaministrit Jose Luis Rodriguez Zapaterot dialoogile, hiljuti valimised võitnud Sotsialistlik Töölispartei teatas vastuseks, et ETA on terroristlik rühmitus ja selle avaldustele tähelepanu ei osutata. Vt. samas: Vaherahule järgnes terrorilaine

  8. Euroopa põllumehed ei taha muutusi

    Index Scriptorium Estoniae

    2008-01-01

    Euroopa põllumajandusühistuid koondava ühenduse COGECA ja Euroopa põllumeeste suurima esindusorganisatsiooni COPA seisukoht on, et praegu ei ole õige aeg võtta Euroopa põllumehelt tootmiseks ette nähtud toetust ning suunata see ümber maaelu arenguks

  9. Challenges and Possibilities of EIS on PEMEC

    DEFF Research Database (Denmark)

    Elsøe, Katrine; Kraglund, Mikkel Rykær; Hjelm, Johan

    2017-01-01

    Electrochemical impedance spectroscopy (EIS) has been proven a very strong electrochemical characterization tool in electrochemical research in general and in the areas of fuel cell and battery research in particular. However, this is not the case for polymer electrolyte membrane electrolysis cells...

  10. Ekskantslerit ei kollita huvide konflikt / Nils Niitra

    Index Scriptorium Estoniae

    Niitra, Nils, 1975-

    2010-01-01

    Kaitseministeeriumi vastuse kohaselt vaatasid sealsed audiitorid üle teadus-arendustegevususe uurimistoetuste maksmise ja seni sõlmitud lepingud ning selgus, et kahtlustused, nagu oleks kaitseministeeriumi endine kantsler Lauri Almann oma eraäri juba kantslerina ette valmistanud, ei vasta tõele. Autor vabandab Lauri Almanni ees

  11. Kes ei maga, see vaatab / Jaanus Kulli

    Index Scriptorium Estoniae

    Kulli, Jaanus, 1955-

    2004-01-01

    Peale mängufilmi "Täna öösel me ei maga" esilinastust Coca-Cola Plazas : režissöör Ilmar Taska : produtsent ning üks stsenariste Kristian Taska. Lisaks vastavad Signe Kivi ja Urmas Paet küsimusele "Millised on teie esmamuljed filmist?"

  12. Tallinna Ülikool ei kiida riiki

    Index Scriptorium Estoniae

    2006-01-01

    Tallinna Ülikool teatas läbi kõneisiku, et juhtkonna otsusel ei laulda tänasel avaaktusel, kus osalevad keskerakondlased, üliõpilashümni "Gaudeamus" neljandat salmi - "Elagu vabariik ja need, kes teda juhivad"

  13. E-I 90. Proceedings. V. 2

    International Nuclear Information System (INIS)

    1990-01-01

    The developments and technology trends taking place in the power industry in South Africa were examined at the E-I 90 conference. Some of the developments in local nuclear power technology were also discussed. Separate abstracts were prepared for five of the papers presented at the conference. The remaining papers were considered outside the subject scope of INIS

  14. Madal palk ei ole konkurentsieelis / Kristo Kiviorg

    Index Scriptorium Estoniae

    Kiviorg, Kristo

    2007-01-01

    Seminaril "Peidetud väärtus: kuidas ettevõtted saavutavad tavaliste inimeste abiga erakordseid tulemusi" ettekannetega esinenud Stanfordi Ülikooli professor Jeffrey Pfeffer ning inimressursside juhtimise konsultant David Russo tõdesid, et madal palk ei taga firmadele konkurentsieelist, kuigi paljud juhid nõnda arvavad

  15. Vale, mis ei taha surra / Urmas Kiil

    Index Scriptorium Estoniae

    Kiil, Urmas

    2005-01-01

    Juuditar Hadassa Ben-Itto raamatu "Vale, mis ei taha surra" (The Lie That Wouldn't Die: the Protocols of the Elders of Zion) sünniloost. Autor, kes oli Iisraelis kõrge kohtunik, loobus oma karjäärist, et tuua avalikkuse ette tõde XX sajandil palju surma külvanud plagiaadist "Siioni tarkade protokollid"

  16. Final Report for DOE Project DE-FC07-99CH11010

    Energy Technology Data Exchange (ETDEWEB)

    Jed Randall; Robert Kean

    2003-10-22

    Department of Energy award number DE-FC07-99CH11010, Enhanced Utilization of Corn Based Biomaterials, supported a technology development program sponsored by Cargill Dow LLC from September 30, 1999 through June 30, 2003. The work involved fundamental scientific studies on poly lactic acid (PLA), a new environmentally benign plastic material from renewable resources. DOE funds supported academic research at the Colorado School of Mines and the National Renewable Energy Laboratory (NREL), and industry cost share was directed towards applied research into new product development utilizing the fundamental information generated by the academic partners. Under the arrangement of the grant, the fundamental information is published so that other companies can utilize it in evaluating the applicability of PLA in their own products. The overall project objective is to increase the utilization of PLA, a renewable resource based plastic, currently produced from fermented corn sugar.

  17. How does one develop the right quality assurance program for waste management projects?

    International Nuclear Information System (INIS)

    Hedges, D.

    1988-01-01

    The quality assurance requirements in use today for radioactive waste facilities, geologic repositories and hazardous waste projects were developed initially for the nuclear power plant industry, and their intent is being applied to regulations and guidance documents to radioactive and hazardous waste programs. The wording of the Nuclear Regulatory Commission (NRC) quality assurance (QA) requirements in Appendix B of 10CFR50, the related guidance documents and the industry's ANSI/ASME NQA-1 were developed over a period of several years to address quality assurance for the design and construction of the complex and interactive systems to produce electrical power using nuclear fuel. Now, those same documents are the basis for the quality assurance requirements and guidance for waste management facilities and repositories. The intent of Appendix B of 10CFR50 and NQA-1 can easily be applied to waste projects providing one understands and uses the intent of the requirements. This paper describes the intent of existing QA requirements as they apply to radioactive and hazardous waste programs. Methods of ensuring that the quality assurance program design will be acceptable to DOE and regulatory agencies are illustrated

  18. How does one develop the right quality assurance program for waste management projects?

    International Nuclear Information System (INIS)

    Hedges, D.

    1988-01-01

    The quality assurance requirements in use today for radioactive waste facilities, geologic repositories and hazardous waste projects were developed initially for the nuclear power plant industry, and their intent is being applied by regulations and guidance documents to radioactive and hazardous waste programs. The wording of the NRC quality assurance requirements in Appendix B of 10CFR50, the related guidance documents and the industry's ANSI/ASME NQA-1 were developed over a period of several years to address quality assurance for the design and construction of the complex and interactive systems to produce electrical power using nuclear fuel. Now, those same documents are the basis for the quality assurance requirements and guidance for waste management facilities and repositories. The intent of Appendix B of 10CFR50 and NQA-1 can easily be applied to waste projects, providing one understands and uses the intent of the requirements. This paper describes the intent of existing QA requirements as they apply to radioactive and hazardous waste programs. Methods of ensuring that the quality assurance program design will be acceptable to DOE and regulatory agencies are illustrated

  19. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  20. Effluent information system (EIS)/onsite discharge information system (ODIS) 1985 executive summary

    International Nuclear Information System (INIS)

    Watanabe, T.

    1986-09-01

    The Effluent Information System (EIS) and Onsite Discharge Information System (ODIS) are Department of Energy (DOE) data base systems that aid DOE-Headquarters and Field Offices in managing the radioactive air and liquid effluents from DOE facilities. Data on effluents released offsite are entered into EIS and data on effluents discharged onsite and retained onsite are entered into ODIS. This document is a summary of information obtained from the CY 1985 effluent data received from all DOE and DOE contractor facilities and entered in the data bases. Data from previous years are also included. The summary consists of two parts. The first part summarizes information for effluents released offsite, and the second part summarizes information for effluents retained onsite. These summaries are taken from the routine annual reports sent to each DOE Operations Office. Special tabulations or specific data can be supplied upon request. Explanations of the significant changes are included in the EIS and ODIS graphic sections. Only those changes in activity greater than a factor of two and having a magnitude greater than 0.1 Ci are considered significant and are addressed in the explanation

  1. Kohtunik, ma ei saa teist aru! / Marko Mägi

    Index Scriptorium Estoniae

    Mägi, Marko

    2007-01-01

    Kohtuasjast USAs Arizonas kolme inimsmugeldamises kahtlustatava Mehhiko mehe üle, kelle suhtes ei saa kohtuotsust langetada, kuna ei suudeta tuvastada keelt, mida kohtualused on võimelised mõistma süüdistusest aru saamiseks

  2. IT ei loe / Nicholas G. Carr

    Index Scriptorium Estoniae

    Carr, Nicholas G.

    2003-01-01

    Harvard Business Review endise toimetaja arvates on infotehnoloogia (IT) strateegiline tähtsus ettevõtetes oluliselt vähenenud ning innovaatilised IT lahendused ei anna enam konkurentsieeliseid, mille tõttu peab muutuma ka juhtide suhtumine IT riskidesse, investeeringutesse ja juhtimisse. Vt. samas: Kuidas vältida üleinvesteerimist IT-sse?; Liiga palju head; Mis saab müüjatest?; Uued reeglid IT juhtimises. Kommenteerivad Henn Sarv, Avo Kokk, Olli Heinonen ja Jüri Kaljundi

  3. Implications of Using Corn Stalks as a Biofuel Source: A Joint ARS and DOE Project

    Science.gov (United States)

    Wilhelm, W. W.; Cushman, J.

    2003-12-01

    Corn stover is a readily source of biomass for cellulosic ethanol production, and may provide additional income for growers. Published research shows that residue removal changes the rate of soil physical, chemical, and biological processes, and in turn, crop growth. Building a sustainable cellulosic ethanol industry based on corn residue requires residue management practices that do not reduce long-term productivity. To develop such systems, impacts of stover removal on the soil and subsequent crops must be quantified. The ARS/DOE Biofuel Project is the cooperative endeavor among scientists from six western Corn Belt US Dept. of Agriculture, Agricultural Research Service (ARS) locations and US Dept. of Energy. The objectives of the project are to determine the influence of stover removal on crop productivity, soil aggregation, quality, carbon content, and seasonal energy balance, and carbon sequestration. When residue is removed soil temperatures fluctuate more and soil water evaporation is greater. Residue removal reduces the amount of soil organic carbon (SOC), but the degree of reduction is highly dependent on degree of tillage, quantity of stover removed, and frequency of stover removal. Of the three cultural factors (stover removal, tillage, and N fertilization) tillage had the greatest effect on amount of corn-derived SOC. No tillage tends to increase the fraction of aggregates in the 2.00 to 0.25 mm size range at all removal rates. Stover harvest reduces corn-derived SOC by 35% compared to retaining stover on the soil averaged over all tillage systems. Corn stover yield has not differed across stover removal treatments in these studies. In the irrigated study, grain yield increased with stover removal. In the rain-fed studies, grain yield has not differed among residue management treatments. Incorporating the biomass ethanol fermentation by-product into a soil with low SOC showed a positive relationship between the amount of lignin added and the subsequent

  4. Geothermal Exploration Case Studies on OpenEI (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Young, K.; Bennett, M.; Atkins, D.

    2014-03-01

    The U.S. Geological Survey (USGS) resource assessment (Williams et al., 2008) outlined a mean 30 GWe of undiscovered hydrothermal resource in the western United States. One goal of the U.S. Department of Energy's (DOE) Geothermal Technology Office (GTO) is to accelerate the development of this undiscovered resource. DOE has focused efforts on helping industry identify hidden geothermal resources to increase geothermal capacity in the near term. Increased exploration activity will produce more prospects, more discoveries, and more readily developable resources. Detailed exploration case studies akin to those found in oil and gas (e.g. Beaumont and Foster, 1990-1992) will give developers central location for information gives models for identifying new geothermal areas, and guide efficient exploration and development of these areas. To support this effort, the National Renewable Energy Laboratory (NREL) has been working with GTO to develop a template for geothermal case studies on the Geothermal Gateway on OpenEI. In 2012, the template was developed and tested with two case studies: Raft River Geothermal Area (http://en.openei.org/wiki/Raft_River_Geothermal_Area) and Coso Geothermal Area (http://en.openei.org/wiki/Coso_Geothermal_Area). In 2013, ten additional case studies were completed, and Semantic MediaWiki features were developed to allow for more data and the direct citations of these data. These case studies are now in the process of external peer review. In 2014, NREL is working with universities and industry partners to populate additional case studies on OpenEI. The goal is to provide a large enough data set to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.

  5. 34 CFR 658.12 - For what kinds of projects does the Secretary assist associations and organizations?

    Science.gov (United States)

    2010-07-01

    ... Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION UNDERGRADUATE INTERNATIONAL... contribution to strengthening and improving undergraduate instruction in international studies and foreign... 34 Education 3 2010-07-01 2010-07-01 false For what kinds of projects does the Secretary assist...

  6. 34 CFR 658.10 - For what kinds of projects does the Secretary assist institutions of higher education?

    Science.gov (United States)

    2010-07-01

    ... institutions of higher education? 658.10 Section 658.10 Education Regulations of the Offices of the Department... Program? § 658.10 For what kinds of projects does the Secretary assist institutions of higher education? (a) The Secretary may provide assistance to an institution of higher education, a consortium of...

  7. 23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?

    Science.gov (United States)

    2010-04-01

    ... public-private partnership? 636.119 Section 636.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT... does this part apply to a project developed under a public-private partnership? (a) In order for a... Federal-aid procurement procedures will depend on the nature of the public-private agreement. (1) If the...

  8. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  9. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17-21, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team's findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ''US Department of Energy Voluntary Protection Program, Part 1: Program Elements'' to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA's VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status

  10. Texas Solar Collaboration DOE Rooftop Solar Challenge City of Houston Project Summary

    Energy Technology Data Exchange (ETDEWEB)

    Ronk, Jennifer [Houston Advanced Research Center, TX (United States)

    2013-02-14

    The City of Houston is committed to achieving a sustainable solar infrastructure. In 2008, Houston was named a United States Department of Energy (DOE) Solar America City. As a Solar America City, Houston teamed with the Houston Advanced Research Center (HARC), Sandia National Laboratory (Sandia), industry, and academia, to implement the Solar Houston Initiative and prepare the Solar Houston Plan. The Solar Houston initiative was focused on identifying and overcoming barriers associated with establishing a solar infrastructure that is incorporated into the City of Houston’s overall energy plan. A broad group of Houston area stakeholders, facilitated by HARC, came together to develop a comprehensive solar plan that went beyond technology to address barriers and establish demonstrations, public outreach, education programs and other activities. The plan included proposed scopes of work in four program areas: policies, solar integration, public outreach, and education. Through the support of the DOE SunShot Rooftop Solar Challenge (RSC) grant to the Texas Collaboration (San Antonio, Austin, and Hosuton), Houston has been able to implement several of the recommendations of the Solar Houston Plan. Specific recommendations that this project was able to support include; Working with the other Texas Solar America Cities (San Antonio and Austin), to harmonize permitting and inspection processes to simplify for installers and lower soft costs of installation; Participating in state level solar policy groups such as the Texas Renewable Energy Industries Association (TRIEA); Continued coordination with the local transmission and distribution utility (CenterPoint) and retail electric providers (REP); Identification of opportunities to improve permitting and interconnection; Providing training on PV systems to City inspectors; Educating the public by continuing outreach, training, and workshops, particularly using the the Green Building Resources Center; Evaluating methods of

  11. Four EIS Perspectives: A literature review

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Svejvig, Per

    A literature review of the Enterprise Information Systems literature reveals a number of recurring issues. We identify and detail four different perspectives that together categorizes the topics found. The first being a technical-rational perspective. The second being a social perspective....... The third being a more political and emergent perspective. Fourth, we identify a design-oriented perspective. We categorize the literature on EIS using these four perspectives, and for each perspective we identify core issues. Finally we discuss how the four perspectives complement each other....

  12. EIS Response of MIC on Carbon Steel

    DEFF Research Database (Denmark)

    Hilbert, Lisbeth Rischel; Maahn, Ernst

    1998-01-01

    Abstract Microbially influenced corrosion of carbon steel under sulphate reducing (sulphide-producing) bacterial activity (SRB) results in the formation of both ferrous sulphides as well as biofilm on the metal surface. The electrochemical characteristics of the ferrous sulphide/steel interface...... as compared to the biofilm/ferrous sulphide/steel interface has been studied with EIS, DC polarisations (Tafel, LPR) and a potentiostatic step technique. The electrochemical response is related to a threshold sulphide concentration above which very characteristic changes such as indications of finite...

  13. 34 CFR 426.4 - What activities does the Secretary fund under the Demonstration Projects?

    Science.gov (United States)

    2010-07-01

    ... Secretary supports the following types of projects: (a) Model projects providing improved access to quality... institutions; and (6) Men and women seeking to enter nontraditional occupations. (b)(1) Projects that are... and apprenticeship projects; (ii) Transitional work site job training for vocational education...

  14. EI competencies as a related but different characteristic than intelligence

    Science.gov (United States)

    Boyatzis, Richard E.; Batista-Foguet, Joan M.; Fernández-i-Marín, Xavier; Truninger, Margarida

    2015-01-01

    Amid the swarm of debate about emotional intelligence (EI) among academics are claims that cognitive intelligence, or general mental ability (g), is a stronger predictor of life and work outcomes as well as the counter claims that EI is their strongest predictor. Nested within the tempest in a teapot are scientific questions as to what the relationship is between g and EI. Using a behavioral approach to EI, we examined the relationship of a parametric measure of g as the person’s GMAT scores and collected observations from others who live and work with the person as to the frequency of his or her EI behavior, as well as the person’s self-assessment. The results show that EI, as seen by others, is slightly related to g, especially for males with assessment from professional relations. Further, we found that cognitive competencies are more strongly related to GMAT than EI competencies. For observations from personal relationships or self-assessment, there is no relationship between EI and GMAT. Observations from professional relations reveal a positive relationship between cognitive competencies and GMAT and EI and GMAT for males, but a negative relationship between EI and GMAT for females. PMID:25713545

  15. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What does a Self-Governance Tribe do if it wants to..., DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section...

  16. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    Energy Technology Data Exchange (ETDEWEB)

    Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

    2013-07-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  17. 78 FR 32240 - Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar...

    Science.gov (United States)

    2013-05-29

    ... DEPARTMENT OF DEFENSE Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar Project at Edwards Air Force Base and County of Kern, CA AGENCY: Department of the... with the development of the Oro Verde Solar Project (OVSP) on Edwards AFB. The OVSP is a solar...

  18. Rasch Analysis of Lebanese Nurses’ Responses to the EIS Questionnaire

    Directory of Open Access Journals (Sweden)

    Michael Clinton

    2014-08-01

    Full Text Available This study examined the psychometric characteristics of a 32-item modified version of the Ethical Issues Scale (EIS. Data were collected from 59 registered nurses at the American University of Beirut Medical Centre (AUBMC. Data were analyzed using WINSTEPS Rasch analysis software. The four-category EIS rating scale needs modification for future studies in Lebanon. All EIS scale items need rewording prior to translation into Arabic to avoid confusion among Lebanese nurses. Principal component analysis (PCA of residuals indicated the possible presence of additional dimensions. Additional EIS items are needed to improve targeting.

  19. EI: A Program for Ecological Inference

    Directory of Open Access Journals (Sweden)

    Gary King

    2004-09-01

    Full Text Available The program EI provides a method of inferring individual behavior from aggregate data. It implements the statistical procedures, diagnostics, and graphics from the book A Solution to the Ecological Inference Problem: Reconstructing Individual Behavior from Aggregate Data (King 1997. Ecological inference, as traditionally defined, is the process of using aggregate (i.e., "ecological" data to infer discrete individual-level relationships of interest when individual-level data are not available. Ecological inferences are required in political science research when individual-level surveys are unavailable (e.g., local or comparative electoral politics, unreliable (racial politics, insufficient (political geography, or infeasible (political history. They are also required in numerous areas of ma jor significance in public policy (e.g., for applying the Voting Rights Act and other academic disciplines ranging from epidemiology and marketing to sociology and quantitative history.

  20. Narbalek uranium mine: from EIS to decommissioning

    International Nuclear Information System (INIS)

    Waggitt, P.W.

    2000-01-01

    The Nabarlek uranium mine operated in Northern Australia from 1979 until 1989 and was the first of the 'new generation' of uranium mines to go through the cycle of EIS, operation and decommissioning. The paper describes the environmental and operational approval processes, the regulatory regime and the decommissioning procedures at the mine. The mine was located on land owned by indigenous Aboriginal people and so there were serious cultural considerations to be taken into account throughout the mine's life. Site work for decommissioning and rehabilitation was completed in 1995 but revegetation assessment has continued until the present time (1999). The paper concludes with the latest assessment and monitoring data and discusses the lessons learned by all parties from the completion of the cycle of mine life 'from cradle to grave'. (author)

  1. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  2. Is equity confined to the shorter term projects - and if not, what does it need?

    International Nuclear Information System (INIS)

    Cryan, T.

    1996-01-01

    There are two types of equity investor generally found in shorter term energy projects: energy project developers or sponsors who view a given project as buying or building a business; and financial investors who have viewed an investment as buying a stream of cash flows. This article examines the objectives and needs of these two investor groups, and discusses the principal issues which govern their respective decision-making process. (author)

  3. 33 CFR 230.13 - Environmental Impact Statement (EIS).

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Environmental Impact Statement..., DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA § 230.13 Environmental Impact Statement (EIS). An EIS... issues and impacts. The transmittal letter to EPA as well as the cover sheet should clearly identify the...

  4. Piirivalve : radar piiritusevoolikut ei püüa

    Index Scriptorium Estoniae

    2004-01-01

    Piirivalvet kritiseeriti selle eest, et see ei märganud salapiirituse veoks paigaldatud voolikut Narva veehoidlas. Ida-Viru piirkonnaülema Roland Peetsi sõnul ei ole ükski radar võimeline fikseerima liikumist vee all

  5. Euroopa paindumatus Eestile eurot ei luba / Hindrek Riikoja

    Index Scriptorium Estoniae

    Riikoja, Hindrek

    2006-01-01

    Vt. ka Postimees : na russkom jazõke 17. juuli lk. 9. 14. juulil Eesti rahandusministri Aivar Sõerdi ja peaminister Andrus Ansipiga kohtunud Euroopa Komisjoni rahandusvolinik Joaquin Almunia kinnitas, et Eestil ei maksa loota eurokriteeriumide muutmisele, rahandusvoliniku hinnangul Eesti krooni devalveerimine enne eurole üleminekut ei ole vajalik

  6. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    Energy Technology Data Exchange (ETDEWEB)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  7. Natural Gas Deliverability Task Force report: A joint FERC/DOE project

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of the FERC/DOE Natural Gas Deliverability Task Force Report was threefold: (1) to review current deliverability data for utility, accuracy, and timeliness; (2) to identify mechanisms for closing significant gaps in information resulting from changing market structures; and (3) to ensure that technologies are available to meet the needs of the emerging, competitive natural gas industry

  8. Final report of DOE project "Detection, Localization and Diagnosis of Performance Problems Using PerfSONAR"

    Energy Technology Data Exchange (ETDEWEB)

    Dovrolis, Konstantinos [Georgia Tech

    2014-04-15

    We present the development of a middleware service, called Pythia, that is able to detect, localize, and diagnose performance problems in the network paths that interconnect research sites that are of interest to DOE. The proposed service can analyze perfSONAR data collected from all participating sites.

  9. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Energy Technology Data Exchange (ETDEWEB)

    Brower, Richard [Boston U.; Christ, Norman [Columbia U.; DeTar, Carleton [Utah U.; Edwards, Robert [Jefferson Lab; Mackenzie, Paul [Fermilab

    2017-10-30

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  10. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Science.gov (United States)

    Brower, Richard; Christ, Norman; DeTar, Carleton; Edwards, Robert; Mackenzie, Paul

    2018-03-01

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  11. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Directory of Open Access Journals (Sweden)

    Brower Richard

    2018-01-01

    Full Text Available In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020’s. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  12. Management and financing of e-Government projects in India: Does financing strategy add value?

    Directory of Open Access Journals (Sweden)

    Shashank Ojha

    2017-06-01

    Full Text Available How do managers structure e-government projects and address challenges of risks, lack of technical expertise, and mitigation of strategic error for preventing loss of investments? Our aim was to compare the traditional finance approach and the strategy-driven, innovative financing approaches under the PPP model, to examine their managerial value-addition. We found that e-government projects require a carefully crafted structuring strategy and that innovative financing is more suitable in facilitating flexible decision making, building core capabilities, managing and sharing project risks, providing funds needed for growth and innovation, and customising tailor-made project governance strategy. Based on our findings, we develop five theoretical propositions.

  13. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  14. The Influence of Emotional Intelligence (EI) on Coping and Mental Health in Adolescence: Divergent Roles for Trait and Ability EI

    Science.gov (United States)

    Davis, Sarah K.; Humphrey, Neil

    2012-01-01

    Theoretically, trait and ability emotional intelligence (EI) should mobilise coping processes to promote adaptation, plausibly operating as personal resources determining choice and/or implementation of coping style. However, there is a dearth of research deconstructing if/how EI impacts mental health via multiple coping strategies in adolescence.…

  15. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  16. THE “EASTERN PARTNERSHIP” PROJECT: DOES POLAND’S VOICE STILL MATTER?

    Directory of Open Access Journals (Sweden)

    Ivanna MACHITIDZE

    2016-10-01

    Full Text Available When in the year 2009 Radoslaw Sikorski and Carl Bildt, architects of the Eastern Partnership project, launched the ambitious scheme of bringing the six post-Soviet countries closer to the EU, they could hardly predict that in nearly five years the tremendous diplomatic, political efforts to design an effective soft power approach would find itself on the verge of failure. In this relation, Poland’s role in bringing the EaP countries under the umbrella of the project long before becoming the EU member, however, most productively since joining the organization, could not be underestimated. Despite a complicated historical legacy with some of the EaP members, namely, Ukraine, Belarus and Moldova, Poland together with the Baltic countries turned out to be a vocal proponent of bringing the former ones under the initiative, aiming to empower them with the leverage against Russia’s successful efforts to destabilize the region and preserve domination in its immediate neighbourhood. Nevertheless, taking into account the changes in Poland’s political climate, namely, victory of the Law and Justice Party in both presidential and parliamentary elections of 2015 as well as its pessimist stance towards effectiveness of the Eastern Partnership project, the question arises whether Poland’s voice still matters in the future of the EaP and whether it sees itself as the moving force of the project.

  17. "Does Hope Change? Testing a Project-Based Health Intervention among Urban Students of Color"

    Science.gov (United States)

    Zusevics, Kaija L.; Johnson, Sheri

    2014-01-01

    Hope is positively correlated with educational attainment and health. Interventions based on project-based learning (PBL) may increase youth hope. This study examined how a PBL intervention affected hope among urban students of color. Students in health classes were invited to participate. A PBL health class was implemented in four classrooms. The…

  18. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk

  19. 77 FR 52108 - Notice of Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement (EIS...

    Science.gov (United States)

    2012-08-28

    ... Environmental Policy Act (NEPA) activities with the Bureau of Land Management as the Lead Agency to secure the... Intent To Prepare an Environmental Impact Statement (EIS) for the Proposed Sheep Mountain Parkway... Multimodal Transportation Project, which includes highway, transit, and non-motorized trail components in...

  20. 33 CFR 230.7 - Actions normally requiring an Environmental Assessment (EA) but not necessarily an EIS.

    Science.gov (United States)

    2010-07-01

    .... (d) Construction and Operations and Maintenance. Changes in environmental impacts which were not considered in the project EIS or EA. Examples are changes in pool level operations, use of new disposal areas, location of bank protection works, etc. (e) Real Estate Management and Disposal Actions. (1) Disposal of a...

  1. 77 FR 58531 - Notice of Intent To Prepare a Joint Environmental Impact Statement (EIS) for the Gateway Pacific...

    Science.gov (United States)

    2012-09-21

    ... social, economic, and environmental impacts of the projects and is intended to be sufficient in scope to... across streams. The Corps is preparing an EIS to analyze the potential social, economic, and...; land use; and aesthetics. c. The Corps will serve as the lead agency for compliance with NEPA, and...

  2. DOE's performance evaluation project for mixed low-level waste disposal

    International Nuclear Information System (INIS)

    Waters, R.D.; Chu, M.S.Y.; Gruebel, M.M.; Lee, D.W.

    1995-01-01

    A performance evaluation (PE) is an analysis that estimates radionuclide concentration limits for 16 potential Department of Energy (DOE) mixed low-level waste (ULLW) disposal sites based on the analysis of two environmental exposure pathways (air and water) to an off-site individual and an inadvertent-intruder exposure pathway. Sites are analyzed for their ability to attenuate concentrations of specific radionuclides that could be released from wastes in a hypothetical ULLW disposal facility. Site-specific data and knowledge are used within a generic framework that is consistent across all sites being evaluated. After estimates of waste concentrations for the three pathways are calculated, the minimum of the waste concentration values is selected as the permissible waste concentration for each radionuclide. The PE results will be used as input to the process for DOE's ULLW disposal configuration. Preliminary comparisons of results from the PE and site-specific performance assessments indicate that the simple PE results generally agree with results of the performance assessments, even when site conditions are complex. This agreement with performance-assessment results increases confidence that similar results can be obtained at other sites that have good characterization data. In addition, the simple analyses contained in the PE illustrate a potential method to satisfy the needs of many regulators and the general public for a simple, conservative, defensible, and easily understandable analysis that provides results similar to those of more complex analyses

  3. How does an ICT-competent mathematics teacher benefit from an ICT-integrative project?

    DEFF Research Database (Denmark)

    Skott, Charlotte Krog; Østergaard, Camilla Hellsten

    2016-01-01

    . We use a theoretical framework for classroom mathematical practices to conceptualise teachers´ learning from a participatory perspective. On the one hand, the teacher realises a potential for a more dialogical approach to teaching. On the other hand, she appears to maintain her habits in relation......We investigate an ICT-competent mathematics teacher’s potentials for professional development as she participates in a sixth-grade statistics project aimed at developing practices that integrate ICTs. This is a critical case study, partly because the teacher is not challenged by the proposed ICTs...... to ICT-use. These contrary tendencies negatively influence the students’ learning opportunities. We offer explanations for why the teacher seems to sticks with her ICT-habits as well as suggestions for future research- and development projects....

  4. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  5. Does assessing project work enhance the validity of qualifications? The case of GCSE coursework

    Directory of Open Access Journals (Sweden)

    Victoria Crisp

    2009-03-01

    Full Text Available This paper begins by describing current views on validity and how certain assessment forms, such as school-based project work, may enhance validity. It then touches on debates about the dependability of assessment by teachers. GCSEs and GCSE coursework are then described along with the reasons for the inclusion of coursework in many GCSEs. Crooks, Kane and Cohen’s (1996 chain model of eight linked stages of validity enquiry is then used as a structure within which to consider the validity of project work assessments, and specifically GCSE coursework assessment, drawing on the available literature. Strengths for validity include the ability to assess objectives that are difficult to test in written examinations, promoting additional skills such as critical thinking, creativity and independent thinking, and improving motivation. Possible threats to validity include the potential for internet and other types of plagiarism, tasks becoming overly structured and formulaic thus reducing the positive impact on learning, and the potentially heavy workload for teachers and students. The paper concludes by describing current policy changes in the UK with regard to GCSE coursework and relates this to strong and weak validity links for project work as a mode of assessment.

  6. ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Field, K.; Punjabi, S.

    2014-08-01

    In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

  7. Swedbank ei pikenda Rumeenia fondi võlakirju / Piret Reiljan

    Index Scriptorium Estoniae

    Reiljan, Piret, 1983-

    2010-01-01

    Swedbank ei pikendanud IPC Investment Groupi poolt hallatava Rumeenia kinnisvarafondi Nord Hill Land Portfolio tähtaega ning fond peab vara müüki panema. IPC Investment Groupi omanikud on Indrek Elhi ja rumeenlane Ciprian Lopata

  8. Turundajad ei oska kasutada kogutud kliendiinfot / Eda-Liis Kann

    Index Scriptorium Estoniae

    Kann, Eda-Liis, 1979-

    2004-01-01

    Eesti kaupmehed koguvad kliendiinfot, kuid klientide kasumlikkust ei arvutata. Lisa: Kliendid pole motiveeritud oma ostu registreerima; Tesco põhilised erinevused võrreldes Eesti lojaalsusprogrammidega; Partnerkaart; Säästukaart; Stockmanni püsikliendikaart

  9. Pärt, Arvo: "Beatus". Statuit ei Dominus / Patric Wiklacz

    Index Scriptorium Estoniae

    Wiklacz, Patric

    1997-01-01

    Uuest heliplaadist "Pärt, Arvo: "Beatus". Statuit ei Dominus. Missa syllabica. Beatus Petronius. 7 Magnificat-Antiphonen. De profundis. Memento. Cantate Domino. Solfeggio. Estonian Philharmonic Chamber Choir, T. Kaljuste". Virgin Classics 545 276-2 (CD:167F)

  10. Kui parimast ei piisa, siis piisab erinevast / Gustav Hafren

    Index Scriptorium Estoniae

    Hafren, Gustav

    2003-01-01

    Autor leiab, et turul, kus ei võida mitte kvaliteetsemad tooted, vaid tooted, mis omavad kindlat kohta klientide teadvuses, on kõige olulisem eristuda konkurentidest. Lisa: Milline on kliendi teadvus? Kokkuvõte autori ettekandest turunduskonverentsil "Password 2003".

  11. "Live 8" tähti ei auhinnata

    Index Scriptorium Estoniae

    2006-01-01

    Briti muusikapreemia Brit Awards žürii ei võtnud parima kontsertesituse auhinnapretendentide nimekirja ansamblit Pink Floyd ja lauljat Robbie Williamsi, kuna nende 20-minutiline esitus polevat auhinna saamiseks veenev

  12. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  13. DOE/Project SEED student scholars partnership. Final report, June 7, 1994--April 27, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-13

    Project SEED is an innovative career development activity administered by ACS for economically disadvantaged high school students. SEED students spend 10 weeks during the summer in an academic, industrial, or governmental research laboratory working under the supervision of a researcher. Intent is to attempt to overcome obstacles which have excluded the economically disadvantaged from professional careers. Students are required to prepare a technical summary, give presentations to their sponsoring groups, and design and display a poster session. Each student also completed a pre- and post-program survey.

  14. Uuring : neljandik elanikke ei tea Ilvese tegevusest midagi / Dannar Leitmaa

    Index Scriptorium Estoniae

    Leitmaa, Dannar, 1982-

    2007-01-01

    Uuringufirma Faktum & Ariko korraldatud küsitlusest selgus, et 23 % elanikest ei oska öelda, millega on president Toomas Hendrik Ilves viimase aasta jooksul silma paistnud. Eesti Päevalehe poolt tellitud küsitluse tulemusi kommenteerib politoloog Rein Toomla. Ilmunud ka: Harju Ekspress 16. nov. 2007, lk. 2, pealk.: Presidendi tegevusest ei tea iga neljas eestimaalane midagi (lüh.)

  15. Virginia Offshore Wind Technology Advancement Project (VOWTAP) DOE EE0005985 Final Technical Report Rev 1a

    Energy Technology Data Exchange (ETDEWEB)

    Pietryk, Steven [Dominion, Richmond, VA (United States)

    2017-01-31

    The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGs (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.

  16. Esmeralda Energy Company, Final Scientific Technical Report, January 2008. Emigrant Slimhole Drilling Project, DOE GRED III

    Energy Technology Data Exchange (ETDEWEB)

    Deymonaz, John [Fish Lake Green Power Co. (United States); Hulen, Jeffrey B. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Nash, Gregory D. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Schriener, Alex [Earth Systems Southwest (United States)

    2008-01-22

    The Emigrant Slimhole Drilling Project (ESDP) was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included detailed geologic mapping; 3-D modeling; compilation of a GIS database; and production of a conceptual geologic model followed by the successful drilling of the 2,938 foot deep 17-31 slimhole (core hole), which encountered commercial geothermal temperatures (327⁰ F) and exhibits an increasing, conductive, temperature gradient to total depth; completion of a short injection test; and compilation of a detailed geologic core log and revised geologic cross-sections. Results of the project greatly increased the understanding of the geologic model controlling the Emigrant geothermal resource. Information gained from the 17-31 core hole revealed the existence of commercial temperatures beneath the area in the Silver Peak Core Complex which is composed of formations that exhibit excellent reservoir characteristics. Knowledge gained from the ESDP may lead to the development of a new commercial geothermal field in Nevada. Completion of the 17-31 core hole also demonstrated the cost-effectiveness of deep core drilling as an exploration tool and the unequaled value of core in understanding the geology, mineralogy, evolutional history and structural aspects of a geothermal resource.

  17. Ferrocyanide safety project ferrocyanide aging studies. Final report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200 degrees C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990

  18. CON4EI: Bovine Corneal Opacity and Permeability (BCOP) test for hazard identification and labelling of eye irritating chemicals.

    Science.gov (United States)

    Verstraelen, Sandra; Maglennon, Gareth; Hollanders, Karen; Boonen, Francis; Adriaens, Els; Alépée, Nathalie; Drzewiecka, Agnieszka; Gruszka, Katarzyna; Kandarova, Helena; Willoughby, Jamin A; Guest, Robert; Schofield, Jane; Van Rompay, An R

    2017-10-01

    Assessment of ocular irritation potential is an international regulatory requirement in the safety evaluation of industrial and consumer products. None in vitro ocular irritation assays are capable of fully categorizing chemicals as stand-alone. Therefore, the CEFIC-LRI-AIMT6-VITO CON4EI consortium assessed the reliability of eight in vitro test methods and computational models as well as established a tiered-testing strategy. One of the selected assays was Bovine Corneal Opacity and Permeability (BCOP). In this project, the same corneas were used for measurement of opacity using the OP-KIT, the Laser Light-Based Opacitometer (LLBO) and for histopathological analysis. The results show that the accuracy of the BCOP OP-KIT in identifying Cat 1 chemicals was 73.8% while the accuracy was 86.3% for No Cat chemicals. BCOP OP-KIT false negative results were often related to an in vivo classification driven by conjunctival effects only. For the BCOP LLBO, the accuracy in identifying Cat 1 chemicals was 74.4% versus 88.8% for No Cat chemicals. The BCOP LLBO seems very promising for the identification of No Cat liquids but less so for the identification of solids. Histopathology as an additional endpoint to the BCOP test method does not reduce the false negative rate substantially for in vivo Cat 1 chemicals. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. How does sustainability certification affect the design process? Mapping final design projects at an architectural office

    DEFF Research Database (Denmark)

    Landgren, Mathilde; Jensen, Lotte Bjerregaard

    2017-01-01

    process and informing the industry of them. This has led to optimised design processes such as Integrated Energy Design, in which many decisions related to energy consumption and indoor climate are made in the early design stages. The current tendency is to use an expanded notion of sustainability......, derived from the sustainability certification system itself, and to apply it even in the early design process. This perspective emphasises all phases of the life cycle of a building. The goal of the present study was to map how a Danish architectural office approached sustainability in the projects......The context of the study is the very strict regulation of energy consumption for operating buildings in Denmark. It is difficult to meet the requirements by system optimisation in the final design phase, so recent research has focused on ways of meeting the target by adapting the whole design...

  20. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    International Nuclear Information System (INIS)

    Joyner, William Scott; Knight, Mark A.

    2013-01-01

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information

  1. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    Energy Technology Data Exchange (ETDEWEB)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  2. Does air-sea coupling influence model projections of the effects of the Paris Agreement?

    Science.gov (United States)

    Klingaman, Nicholas; Suckling, Emma; Sutton, Rowan; Dong, Buwen

    2017-04-01

    The 2015 Paris Agreement includes the long-term goal to hold global-mean temperature to "well below 2°C above pre-industrial levels", with the further stated aim of limiting the global-mean warming to 1.5°C, in the belief that this would "significantly reduce the risks and impacts of climate change". However, it is not clear which risks and impacts would be avoided, or reduced, by achieving a 1.5°C warming instead of a 2.0°C warming. Initial efforts to quantify changes in risk have focused on analysis of existing CMIP5 simulations at levels of global-mean warming close to 1.5°C or 2.0°C, by taking averages over ≈20 year periods. This framework suffers from several drawbacks, however, including the effect of model internal multi-decadal variability, the influence of coupled-model systematic errors on regional circulation patterns, and the presence of a warming trend across the averaging period (i.e., the model is not in steady state). To address these issues, the "Half a degree Additional warming, Prognosis and Projected Impacts" (HAPPI) project is performing large ensembles of atmosphere-only experiments with prescribed sea-surface temperatures (SSTs) for present-day and 1.5°C and 2.0°C scenarios. While these experiments reduce the complications from a limited dataset and coupled-model systematic errors, the use of atmosphere-only models neglects feedbacks between the atmosphere and ocean, which may have substantial effects on the representation of local and regional extremes, and hence on the response of these extremes to global-mean warming. We introduce a set of atmosphere-ocean coupled simulations that incorporate much of the HAPPI experiment design, yet retain a representation of air-sea feedbacks. We use the Met Office Unified Model Global Ocean Mixed Layer (MetUM-GOML) model, which comprises the MetUM atmospheric model coupled to many columns of the one-dimensional K Profile Parameterization mixed-layer ocean. Critically, the MetUM-GOML ocean mean

  3. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  4. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2001-01-01

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO(sub 2) emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO(sub 2) removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge

  5. ASPECTE PRIVIND AUDITUL PERFORMANŢEI ÎN REPUBLICA MOLDOVA

    Directory of Open Access Journals (Sweden)

    Iulia CAPRIAN

    2015-12-01

    Full Text Available Auditul performanţei se concentrează pe determinarea faptului dacă activităţile, proiectele / programele / procesele se desfăşoară conform principiilor economicităţii, eficienţei şi eficacităţii şi dacă mai este loc pentru îmbunătăţiri. Acesta se realizează prin compararea performanţei în funcţie de setul de criterii prestabilite, precum şi prin analiza cauzelor ce determină apariţia problemelor sau devierilor de la aceste criterii, scopul principal fiind de a răspunde unor întrebări-cheie ale auditului şi de a furniza recomandări cu privire la îmbunătăţirile care se pot face.CERTAIN ASPECTS OF PERFORMANCE AUDIT IN THE REPUBLIC OF MOLDOVAPerformance auditing focuses on determining whether the activities, projects / programs / processes are conducted according to the principles of economy, efficiency and effectiveness and whether there is room for improvement; it is conducted by comparing performance on the basis of set criteria, as well as by analysis of the causes of the emergence of problems or deviations from these criteria, the main purpose being to answer certain key questions relevant for the audit and provide recommendations on improvements that can be made.

  6. Saugus River and Tributaries, Lynn, Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 7. Appendix J. Feasibility Study and EIS/EIR Comments and Responses. Section A.

    Science.gov (United States)

    1989-12-01

    project nor affect significantly the projects econmic efficiency. These effects are described in the Feasibility Report, EIS/EIR and suportin...modifications beca necesary. To insure the econmic efficiency of the project using the accelerated rise rate in NRc Case III, the Regional Project was...is a str econmic candidate. 23 Table 14 RICtOALL P3ECr ECONaMEC FEABILIY WI H SEA LEVEL RISE (1988 Price Level) Oticon 3 Historical NRC Project

  7. SNF project's MCO compliance assessment with DOE ''general design criteria,'' order 6430.1A and ''SNF project MCO additional NRC requirements,'' HNF-SD-SNF-DB-005

    International Nuclear Information System (INIS)

    GOLDMANN, L.H.

    1999-01-01

    This document is presented to demonstrate the MCOs compliance to the major design criteria invoked on the MCO. This document is broken down into a section for the MCO's evaluation against DOE Order 6430.1A General Design Criteria sixteen divisions and then the evaluation of the MCO against HNF-SD-SNF-DB-005 ''Spent Nuclear Fuel Project Multi-Canister Overpack Additional NRC Requirements.'' The compliance assessment is presented as a matrix in tabular form. The MCO is the primary container for the K-basin's spent nuclear fuel as it leaves the basin pools and through to the 40 year interim storage at the Canister Storage Building (CSB). The MCO and its components interface with; the K basins, shipping cask and transportation system, Cold Vacuum Drying facility individual process bays and equipment, and CSB facility including the MCO handling machine (MHM), the storage tubes, and the MCO work stations where sampling, welding, and inspection of the MCO is performed. As the MCO is the primary boundary for handling, process, and storage, its main goals are to minimize the spread of its radiological contents to the outside of the MCO and provide for nuclear criticality control. The MCO contains personnel radiation shielding only on its upper end, in the form of a shield plug, where the process interfaces are located. Shielding beyond the shield plug is the responsibility of the using facilities. The design of the MCO and its components is depicted in drawings H-2-828040 through H-2-828075. Not every drawing number in the sequence is used. The first drawing number, H-2-828040, is the drawing index for the MCO. The design performance specification for the MCO is HW-S-0426, and was reviewed and approved by the interfacing design authorities, the safety, regulatory, and operations groups, and the local DOE office. The current revision for the design performance specification is revision 5. The designs of the MCO have been reviewed and approved in a similar way and the reports

  8. Does Library Use Affect Student Attainment? A Preliminary Report on the Library Impact Data Project

    Directory of Open Access Journals (Sweden)

    Graham Stone

    2011-10-01

    . This paper will report on the initial findings of the project and whether the measurable targets have been achieved: Sufficient data are successfully captured from all partners; Statistical significance is proved for all data; The hypothesis is either wholly or partly proved for each data type and partner.

  9. A User's Guide to the SNF ampersand INEL EIS

    International Nuclear Information System (INIS)

    1995-01-01

    This User's Guide is intended to help you find information in the SNF and INEL EIS (that's short for US Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement). The first section of this Guide gives you a brief overview of the SNF ampersand INEL EIS., The second section is organized to help you find specific information in the Environmental Impact Statement -- whether you're interested in a management alternative, a particular site (such as Hanford), or a discipline (such as land use or water quality)

  10. Progress in evaluation of radionuclide geochemical information developed by DOE high-level nuclear waste repository site projects

    International Nuclear Information System (INIS)

    Meyer, R.E.; Arnold, W.D.; O'Kelley, G.D.; Case, F.I.; Land, J.F.

    1989-08-01

    Information that is being developed by projects within the Department of Energy (DOE) pertinent to the potential geochemical behavior of radionuclides at candidate sites for a high-level radioactive waste repository is being evaluated by Oak Ridge National Laboratory (ORNL) for the Nuclear Regulatory Commission (NRC). During this report period, all experiments were conducted with tuff from the proposed high-level nuclear waste site at Yucca Mountain, Nevada. The principal emphasis in this report period was on column studies of migration of uranium and technetium in water from well J-13 at the Yucca Mountain site. Columns 1 cm in diameter and about 5 cm long were constructed and carefully packed with ground tuff. The characteristics of the columns were tested by determination of elution curves of tritium and TcO 4 - . Elution peaks obtained in past studies with uranium were asymmetrical and the shapes were often complex, observations that suggested irreversibilities in the sorption reaction. To try to understand these observations, the effects of flow rate and temperature on uranium migration were studied in detail. Sorption ratios calculated from the elution peaks became larger as the flow rate decreased and as the temperature increased. These observations support the conclusion that the sorption of uranium is kinetically hindered. To confirm this, batch sorption ratio experiments were completed for uranium as a function of time for a variety of conditions

  11. Proceedings of the DOE/Yucca Mountain Site Characterization Project Radionuclde Adsorption Workshop at Los Alamos National Laboratory, September 11--12, 1990

    International Nuclear Information System (INIS)

    Canepa, J.A.

    1992-08-01

    Los Alamos National Laboratory hosted a workshop on radionuclide adsorption for the Department of Energy (DOE)/Yucca Mountain Site Characterization Project on September 11 and 12, 1990. The purpose of the workshop was to respond to a recommendation by the Nuclear Waste Technical Review Board that the DOE organize a radionuclide adsorption workshop to be attended by the DOE and its contractors involved in the measurement and modeling of such adsorption. The workshop would have two general purposes: (a) to determine the applicability of available radionuclide adsorption data on tuff and models for predicting such adsorption under existing and postclosure conditions at Yucca Mountain and (b) to establish what additional radionuclide adsorption research and model development are needed. Individual projects are processed separately for the databases

  12. Balti riikide vabadus ei ohusta Venemaad / Daniel Fried

    Index Scriptorium Estoniae

    Fried, Daniel, 1952-

    2007-01-01

    Ilmunud ka: The Baltic Times, 21. juuni 2007, lk. 15. Ameerika Ühendriikide asevälisminister Euroopa ja Euraasia asjus Daniel Fried Balti riikide tunnustamisest, vabadusest ja suveräänsusest. Venemaa huvides on olla ümbritsetud rahulikest ja jõukatest demokraatiatest, ähvardustele ja sanktsioonidele ei tohi jätta ruumi

  13. Emotional intelligence (EI) and nursing leadership styles among nurse managers.

    Science.gov (United States)

    Tyczkowski, Brenda; Vandenhouten, Christine; Reilly, Janet; Bansal, Gaurav; Kubsch, Sylvia M; Jakkola, Raelynn

    2015-01-01

    Less than 12.5% of nurses aspire to leadership roles, noting lack of support and stress as major factors in their decision not to pursue this area of practice. Psychological resiliency, described as the ability to properly adapt to stress and adversity, is key to successful nurse managers. Emotional intelligence (EI) is a related concept to resiliency and is another noteworthy predictor of leadership and management success. This study was undertaken to determine the level of and relationship between EI and leadership style of nurse managers employed in Wisconsin and Illinois facilities. A descriptive, exploratory study design was utilized, with a convenience sample of nurse managers working in 6 large Midwestern health systems. Nurse managers were invited to participate in the study by their employer, completing the online consent form and the demographic, Multifactor Leadership Questionnaire (MLQ) Form 5X and the Emotional Quotient Inventory (EQ-i 2.0) surveys. Statistically significant positive relationships were noted between EI and transformational leadership and the outcomes of leadership (extra effort, effectiveness, and satisfaction). No statistically significant relationships were noted between EI and transactional or laissez-faire leadership styles.

  14. Turvalisust ei taga vaid sinine vilkur / Ken-Marti Vaher

    Index Scriptorium Estoniae

    Vaher, Ken-Marti, 1974-

    2005-01-01

    Kuritegevuse vastasest võitlusest. Sama ka Pärnu Postimees 8. juuni 2005, lk. 15 ; Hiiu Leht 10. juuni 2005, lk. 2 ; Vali Uudised 8. juuni 2005, lk. 2 artiklis pealkiri kujul: Turvalisust ei taga ainuüksi sinine vilkur ; Nädaline 14. juuni 2005, lk. 4 ; Koit 14. juuni 2005, lk. 6 ; Valgamaalane 5. juuli 2005, lk. 2

  15. Somaalia piraadid ei taha Saksamaale minna / Evelyn Kaldoja

    Index Scriptorium Estoniae

    Kaldoja, Evelyn, 1980-

    2010-01-01

    Saksa kaubalaeva Taipan kaaperdamiselt tabatud somaallased ei taha, et neid antaks välja Saksamaale. Siiani on suurem osa tabatud Somaalia piraatidest saadetud Kenya kohtutesse. Rotterdamis algab järgmisel nädalal üle mitme sajandi esimene Euroopa piraadiprotsess

  16. Maksuamet ei välista Concordia pankrotti / Alo Lõhmus

    Index Scriptorium Estoniae

    Lõhmus, Alo

    2003-01-01

    Maksuamet nendib, et kui Concordia ülikool ei tule toime oma võlgade maksmisega esmaspäevaks, võib kõne alla tulla ka kooli pankroti algatamine. Eesti Üliõpilaskondade Liit ja Concordia Ülikooli Eesis Üliõpilasesindus korraldavad Concordia probleeme käsitleva konverentsi "Kes vastutab Concordia tudengite eest?"

  17. Eesti valitsuse argumendid ei pea vett / Indrek Veiserik

    Index Scriptorium Estoniae

    Veiserik, Indrek

    2008-01-01

    Autori väitel püsib Iraak lõhestatuna ja mingit rahvuslikku leppimist ei ole seal toimunud, seetõttu on Eesti valitsuse loodud ettekujutus peatsest rahu saabumisest vale. USA nädalalehe Newsweek kolumnist Fareed Zakaria leiab, et USA jaoks oleks mõistlik strateegia Iraagis luua rahvusvaheliste institutsioonide poolt sanktsioneeritud rahutagamismissioon

  18. Natura 2000 ei lõpeta elu maal / Aleksei Lotman

    Index Scriptorium Estoniae

    Lotman, Aleksei, 1960-

    2004-01-01

    Natura alade kaitsekorralduse alused sätestab loodusdirektiivi paragrahv 6. Selle põhimõte on vältida elupaikade kahjustamist Natura aladel. Mingi ala kandmine Natura 2000 võrgustikku ei tähenda sugugi igasuguse inimtegevuse automaatset keelamist

  19. Pärnu ATP ei usu streigisse / Tõnu Kann

    Index Scriptorium Estoniae

    Kann, Tõnu, 1957-

    2004-01-01

    Eesti transpordi- ja teetöötajate ametiühing ähvardab uuest aastast üldstreigiga, kui autoettevõtjate liit ei allkirjasta uut üldtöökokkulepet, mis tõstaks tööliste tunnipalga alammäära kuni 150 protsenti. Arvamust avaldab Pärnu bussipargi direktor Andrus Kärpuk

  20. Suitsetamisega võitlemisel ei aita inimeste kiusamine / Silver Meikar

    Index Scriptorium Estoniae

    Meikar, Silver, 1978-

    2004-01-01

    Suitsetamise vastu võitlemisel ei tohiks kasutada rangelt seadusi vaid võimaldada soodsalt osta suitsetamisvastaseid vahendeid, leiab autor. Vt. ka: Silver Meikar: Olen valmis hoidma Eesti edu; Silver Meikar saatis lugejakirja Saksamaa päevalehtedele; Arvamusi Silver Meikarist; Silver Meikar loobus paberkandjale trükitud seaduseelnõudest

  1. Utilization Status of Electronic Information Sources (EIS) for HIV ...

    African Journals Online (AJOL)

    Tesfa

    HIV/AIDS Care and Treatment in Specialized Teaching Hospitals of. Ethiopia, 2016. Senait Samuel Bramo. 1. , Tesfamichael Alaro Agago. 2*. OPEN ACCESS. Citation: Senait Samuel Bramo,. Tesfamichael Alaro Agago. Utilization. Status of Electronic Information Sources. (EIS) for HIV/AIDS Care and Treatment.

  2. EI2N 2009 PC Co-chairs' Message

    Science.gov (United States)

    Panetto, Hervé; Bernus, Peter; Gonçalves, Ricardo; Goranson, Ted

    After the successful third edition in 2008, the fourth edition of the Enterprise Integration, Interoperability and Networking workshop (EI2N 2009) was organized as part of the OTM 2009 Federated Conferences and was supported by the IFAC Technical Committee 5.3 "Enterprise Integration and Networking" and the IFIP Working Group 5.12 "Architectures for Enterprise Integration."

  3. Maestro ei või õnneta elada / Silja Joon

    Index Scriptorium Estoniae

    Joon, Silja, 1966-

    2005-01-01

    Helilooja Veljo Tormise 75. aasta juubelikontserdist "Ei või õnneta elada" 13. aug. Pärnu kontserdimajas (korraldaja Ave Sopp), helilooja palvest õnnitlemiseks mõeldud lillede ja kingituste raha temanimelisse rahvusliku koorimuusika väärtustamiseks loodud fondi kandmisest

  4. Linnugripp ei ole biorelv / Kevin Probert-Ehaver

    Index Scriptorium Estoniae

    Probert-Ehaver, Kevin

    2008-01-01

    Vastukaja 10. juulil Eesti Ekspressis ilmunud artiklile "Linnugripp - surm katseklaasist", milles väidetakse, et linnugripp ning teised uued nakkushaigused on biorelvad. Kriisireguleerimise konsultant selgitab, et nii Eesti kui ka Ameerika spetsialistide hinnangul ei ole linnugripp kuidagi seotud biorelvade programmiga

  5. Heating and dynamics of two flare loop systems observed by AIA and EIS

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y.; Ding, M. D. [School of Astronomy and Space Science, Nanjing University, Nanjing 210093 (China); Qiu, J., E-mail: yingli@nju.edu.cn [Department of Physics, Montana State University, Bozeman, MT 59717 (United States)

    2014-02-01

    We investigate heating and evolution of flare loops in a C4.7 two-ribbon flare on 2011 February 13. From Solar Dynamics Observatory/Atmospheric Imaging Assembly (AIA) imaging observations, we can identify two sets of loops. Hinode/EUV Imaging Spectrometer (EIS) spectroscopic observations reveal blueshifts at the feet of both sets of loops. The evolution and dynamics of the two sets are quite different. The first set of loops exhibits blueshifts for about 25 minutes followed by redshifts, while the second set shows stronger blueshifts, which are maintained for about one hour. The UV 1600 observation by AIA also shows that the feet of the second set of loops brighten twice. These suggest that continuous heating may be present in the second set of loops. We use spatially resolved UV light curves to infer heating rates in the few tens of individual loops comprising the two loop systems. With these heating rates, we then compute plasma evolution in these loops with the 'enthalpy-based thermal evolution of loops' model. The results show that, for the first set of loops, the synthetic EUV light curves from the model compare favorably with the observed light curves in six AIA channels and eight EIS spectral lines, and the computed mean enthalpy flow velocities also agree with the Doppler shift measurements by EIS. For the second set of loops modeled with twice-heating, there are some discrepancies between modeled and observed EUV light curves in low-temperature bands, and the model does not fully produce the prolonged blueshift signatures as observed. We discuss possible causes for the discrepancies.

  6. Final DOE-ASR Report for the Project “Advancing our Understanding and the Remote Sensing of Ice Clouds”

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, David [Desert Research Inst. (DRI), Reno, NV (United States); Erfani, Ehsan [George Mason Univ., Fairfax, VA (United States); Garnier, Anne [Science Systems and Applications, Inc., Hampton, VA (United States); Lawson, Paul [SPEC, Inc., Boulder, CO (United States); Morrison, Hugh [National Center for Atmospheric Research, Boulder, CO (United States); Avery, Melody [NASA Langley Research Center, Hampton, VA (United States)

    2016-12-29

    This project has evolved during its execution, and what follows are the key project findings. This project has arguably provided the first global view of how cirrus cloud (defined as having cloud base temperature T < 235 K) nucleation physics (evaluated through satellite retrievals of ice particle number concentration Ni, effective diameter De and ice water content IWC) evolves with the seasons for a given temperature, latitude zone and surface type (e.g. ocean vs. land), based on a new satellite remote sensing method developed for this project. The retrieval method is unique in that it is very sensitive to the small ice crystals that govern the number concentration Ni, allowing Ni to be retrieved. The method currently samples single-layer cirrus clouds having visible optical depth ranging from about 0.3 to 3.0, using co-located observations from the Infrared Imaging Radiometer (IIR) and from the CALIOP (Cloud and Aerosol Lidar with Orthogonal Polarization) lidar aboard the CALIPSO (Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observation) polar orbiting satellite, employing IIR channels at 10.6 μm and 12.05 μm. Retrievals of Ni are primarily used to estimate the cirrus cloud formation mechanism; that is, either homo- or heterogeneous ice nucleation (henceforth hom and het). This is possible since, in general, hom produces more than an order of magnitude more ice crystals than does het. Thus the retrievals provide insight on how these mechanisms change with the seasons for a given latitude zone or region, based on the years 2008 and 2013. Using a conservative criterion for hom cirrus, on average, the sampled cirrus clouds formed through hom occur about 43% of the time in the Arctic and 50% of the time in the Antarctic, and during winter at mid-latitudes in the Northern Hemisphere, hom cirrus occur 37% of the time. Elsewhere (and during other seasons in the Northern Hemisphere mid-latitudes), this hom cirrus fraction is lower, and it is lowest in the

  7. Solving the Schrödinger equation of helium and its isoelectronic ions with the exponential integral (Ei) function in the free iterative complement interaction method.

    Science.gov (United States)

    Kurokawa, Yusaku I; Nakashima, Hiroyuki; Nakatsuji, Hiroshi

    2008-08-14

    We introduce here the exponential integral (Ei) function for variationally solving the Schrödinger equation of helium and its isoelectronic ions with the free iterative complement interaction (ICI) method. In our previous study [J. Chem. Phys., 2007, 127, 224104], we could calculate very accurate energies of these atoms by using the logarithmic function as the starting function of the free ICI calculation. The Ei function has a weak singularity at the origin, similarly to the logarithmic function, which is important for accurately describing the three-particle coalescence region. The logarithmic function, however, has a node and a maximum along the radial coordinate which may be physically meaningless. In contrast, the Ei function does not have such unphysical behaviors and so would provide an improvement over the logarithmic function. Actually, using the Ei function, instead of the logarithmic function, we obtained the energy, E= -2.903 724 377 034 119 598 311 159 245 194 404 446 696 924 865 a.u. for the helium ground state with 21 035 functions, which is a slight improvement over our previous result (the bold face shows the digits that are believed to have converged). This result supports the suggestion that the Ei function is better than the logarithmic function for describing the three-particle coalescence region.

  8. Ei Compendex: A new database makes life easier for engineers

    CERN Multimedia

    2001-01-01

    The Library is expanding its range of databases. The latest arrival, called Ei Compendex, is the world's most comprehensive engineering database, which indexes engineering literature published throughout the world. It also offers bibliographic entries for articles published in scientific journals and for conference proceedings and covers an extensive range of subjects from mechanical engineering to the environment, materials science, solid state physics and superconductivity. Moreover, it is the most relevant quality control and engineering management database. Ei Compendex contains over 4.6 million references from over 2600 journals, conference proceedings and technical reports dating from 1966 to the present. Every year, 220,000 new abstracts are added to the database which is also updated on a weekly basis. In the case of articles published in recent years, it provides an electronic link to the full texts of all major publishers. The database also contains the full texts of Elsevier periodicals (over 250...

  9. Keegi ei tea mu nime : [luuletused] / Veiko Märka

    Index Scriptorium Estoniae

    Märka, Veiko, 1964-

    2002-01-01

    Tõlgitud Veiko Märka luulekogust "Tühja aju korinad". Sisu: Keegi ei tea mu nime = Kukaan ei tiedä mun nimee ; "Kui ma kuulen sõnu..." = "Kun kuulen ilmauksen..." ; "Esimese..." = "Ensimmäisenä..." ; "Igal hommikul..." = "Joka aamu..." / tlk. Hannu Oittinen. Väike perenaine = Pikku perheenäiti / tlk. Hannu Oittinen ja Tuglas-seuran kääntäjäpiiri. Progressi triumf : (Poeem) = Kehityksen voitto : (Runoelma) / tlk. Hannu Oittinen. Minimalistlikud muinasjutud = Minimalistisia satuja / tlk. Heli Laaksonen ja Hannu Oittinen. Kõige turvalisem seks = Turvallisinta seksiä ; Abistame Aafrikat! = Autetaan Afrikkaa! ; "Taome..." = "Taotaan..." ; "Edasi..." = "Eteenpäin..." ; "Isegi juhus..." = "Edes sattuma..." ; "Miinus ja miinus..." = "Miinus ja miinus..." / tlk. Hannu Oittinen. Leijonien pakottaja ; Kotka ja Vaasa: Ystävyyskaupunkit

  10. CORONAL MASS EJECTION INDUCED OUTFLOWS OBSERVED WITH HINODE/EIS

    International Nuclear Information System (INIS)

    Jin, M.; Ding, M. D.; Chen, P. F.; Fang, C.; Imada, S.

    2009-01-01

    We investigate the outflows associated with two halo coronal mass ejections (CMEs) that occurred on 2006 December 13 and 14 in NOAA 10930, using the Hinode/EIS observations. Each CME was accompanied by an EIT wave and coronal dimmings. Dopplergrams in the dimming regions are obtained from the spectra of seven EIS lines. The results show that strong outflows are visible in the dimming regions during the CME eruption at different heights from the lower transition region to the corona. It is found that the velocity is positively correlated with the photospheric magnetic field, as well as the magnitude of the dimming. We estimate the mass loss based on height-dependent EUV dimmings and find it to be smaller than the CME mass derived from white-light observations. The mass difference is attributed partly to the uncertain atmospheric model, and partly to the transition region outflows, which refill the coronal dimmings.

  11. Piinamise välistanud Rice ei täpsustanud, mis piinamine on / Ahto Lobjakas

    Index Scriptorium Estoniae

    Lobjakas, Ahto, 1970-

    2005-01-01

    USA välisminister Condoleezza Rice ütles Brüsselis, et USA võimud ei rakenda vangide piinamist ei kodu- ega välismaal. Samas ei selgitanud ta, mida USA loeb piinamiseks. NATO peasekretäri Jaap de Hoop Schefferi kommentaare

  12. Feasibility of an EIS Follow-up Program

    International Nuclear Information System (INIS)

    Nelson, I.C.; Jaquish, R.E.; Watson, D.G.

    1982-12-01

    The proposed level of an EIS Follow-up Program is believed to be feasible and that it can and should be implemented. Guidance to authors should result in fewer, but more important, commitments for mitigating adverse environmental impacts. Selecting the significant commitments from Records of Decisions published since July 1, 1979 for tracking to satisfaction should result in conformance with regulations, orders, and the intent of the NEPA

  13. Iraagi raport ei veennud sõjavastaseid / Neeme Raud

    Index Scriptorium Estoniae

    Raud, Neeme, 1969-

    2007-01-01

    Ilmunud ka: Postimees : na russkom jazõke, 12. sept. 2007, lk. 7. USA vägede ülemjuhataja kindral David Petraeus ja USA Iraagi suursaadik Ryuan Crocker kirjeldasid Kongressile Iraagi olukorda, mis ei suutnud sõja suhtes selgelt negatiivsetel positsioonidel rahvaesindajaid veenda, et operatsioonide jätkamine on vajalik. Vt. samas: Ingvar Bärenklau. Riigikogu peab otsustama Eesti missiooni saatuse

  14. Reformierakond ei kauple põhimõtetega / Meelis Atonen

    Index Scriptorium Estoniae

    Atonen, Meelis, 1966-

    2001-01-01

    Ilmunud ka: Hiiu Leht, 11. dets. 2001, lk. 2; Nädaline, 11. dets. 2001, lk. 4; Valgamaalane, 11. dets. 2001, lk. 2; Järva Teataja, 11. dets. 2001, lk. 2; Kesknädal, 19. dets. 2001, lk. 5. Tallinna võimuliidu lagunemise peapõhjus oli Tallinna 2002. aasta eelarvesse kavandatud 900 mln kuni 1,5 mld krooni suurune laen, millega Reformierakond ei ole kunagi nõustnud. Autor: Reformierakond. Parlamendisaadik

  15. Eesti ei pea ümberasujatele midagi tagastama / Helle Kalda

    Index Scriptorium Estoniae

    Kalda, Helle, 1950-

    2006-01-01

    Omandireformi aluste seaduse 7 paragrahvi lõikest 3 ja varade tagastamisest nn. järelümberasunutele. Sama ka Meie Maa 12. jaan. 2006, lk. 2 ; Vooremaa 17. jaan. 2006, lk. 2 ; Virumaa Teataja 2. veeb. 2006, lk. 11 ; Pärnu Postimees 9. veeb. 2006, lk. 15 ; Pärnu Postimees 9. veeb. 2006, lk. 15, pealkiri kujul : Ümberasujatele ei pea midagi tagastama

  16. Progress in evaluation of radionuclide geochemical information developed by DOE high-level nuclear waste repository site projects. Annual report, October 1984-September 1985. Volume 4

    International Nuclear Information System (INIS)

    Meyer, R.E.; Arnold, W.D.; Blencoe, J.G.; Jacobs, G.K.; Kelmers, A.D.; Seeley, F.G.; Whatley, S.K.

    1986-05-01

    Information pertaining to the potential geochemical behavior of radionuclides at candidate sites for a high-level radioactive waste repository, which is being developed by projects within the Department of Energy (DOE), is being evaluated by Oak Ridge National Laboratory for the Nuclear Regulatory Commission (NRC). During this report period, emphasis was placed on the evaluation of information pertinent to the Hanford site in southeastern Washington. Results on the sorption/solubility behavior of technetium, neptunium, and uranium in the basalt/water geochemical system are summarized and compared to the results of DOE. Also, summaries of results are reported from two geochemical modeling studies: (1) an evaluation of the information developed by DOE on the native copper deposits of Michigan as a natural analog for the emplacement of copper canisters in a repository in basalt, and (2) calculation of the solubility and speciation of radionuclides for representative groundwaters from the Yucca Mountain site in Nevada

  17. Particles, processes and materials for modern energy needs: Development of a DOE-EPSCoR project in Puerto Rico. Final report for September 30, 1997 - August 31, 2000

    Energy Technology Data Exchange (ETDEWEB)

    Weiner, Brad R.

    2000-09-29

    Twenty-eight (28) faculty researchers focused on High Energy Particle Physics, Novel Thin Film Materials for Optoelectronic Applications, and Catalytic Processes for Energy Sources and Environmental Detoxification to address problems cited as priorities by the DOE and local agencies. The High Energy Particle Physics cluster has DOE-competitive funding, and the number of cluster investigators who have competitive mainstream funding has increased from 2 to 13 since the inception of the program. In this reporting period, 8 postdoctorals, 38 graduate studnets, and 23 undergraduates were involved in DOE projects, and 191 publications and 238 presentations were generated. The UPR-Arecibo Integrated Science Multi-Use Laboratory provided workshops and other activities that directly impacted 360 teachers and 600 students and indirectly impacted over 25,000 through the enhancement of teachers' skills and knowledge.

  18. EIS immunosensor based on magnetic nanoparticles for ochratoxim A determination

    International Nuclear Information System (INIS)

    Biraruti, Irina; Tudorache, Madalina; Rotariu, Lucian; Bala, Camelia; Jaffrezic-Renault, Nicole

    2009-01-01

    Full text: Ochratoxin A (OTA) is a mycotoxin produced by Aspergillus and Penicillium fungi. It occurs in a variety of foodstuff, including cereals, coffee, wine, grape juice and fruits juice. Maximum permitted levels have been established by the EU and several countries. Currently, there are several methods available for OTA monitoring in real samples, e.g. TLC, HPLC, ELISA immunosensors. Liquid chromatography with fluorescence detection (HPLC-FLD), coupled with immunoaffinity column or solid phase extraction as pretreatment method, has been validated and adopted as official standard for OTA determination. Also, an immunosensor based on electrochemical detection has been reported for rapid analysis of OTA in food and beverages. Our work proposes the development of a new sensitive immunosensor combining the use of magnetic nanoparticles and EIS (electrochemical impedance spectroscopy) detection principle. Anti-OTA antibody immobilised on magnetic nanoparticles were deposited on the EIS electrode surface by applying a magnetic field. Then, OTA sample solutions were added in the detection cell. Quantitative determination of OTA content was performed based on EIS detection. Experimental parameters of the immunosensor were set-up at the optimum values. Based on those values, the immunosensor allows to detect OTA in the range 1-10 ng/mL. The future perspective is to validate this immunochemical method using HPLC-FLD. (authors)

  19. Epilepsy, E/I balance and GABAA receptor plasticity

    Directory of Open Access Journals (Sweden)

    Jean-Marc Fritschy

    2008-03-01

    Full Text Available GABAA receptors mediate most of the fast inhibitory transmission in the CNS. They form heteromeric complexes assembled from a large family of subunit genes. The existence of multiple GABAA receptor subtypes differing in subunit composition, localization and functional properties underlies their role for fi ne-tuning of neuronal circuits and genesis of network oscillations. The differential regulation of GABAA receptor subtypes represents a major facet of homeostatic synaptic plasticity and contributes to the excitation/inhibition (E/I balance under physiological conditions and upon pathological challenges. The purpose of this review is to discuss recent fi ndings highlighting the signifi cance of GABAA receptor heterogeneity for the concept of E/I balance and its relevance for epilepsy. Specifi cally, we address the following issues: (1 role for tonic inhibition, mediated by extrasynaptic GABAA receptors, for controlling neuronal excitability; (2 signifi cance of chloride ion transport for maintenance of the E/I balance in adult brain; and (3 molecular mechanisms underlying GABAA receptor regulation (traffi cking, posttranslational modifi cation, gene transcription that are important for homoeostatic plasticity. Finally, the relevance of these fi ndings is discussed in light of the involvement of GABAA receptors in epileptic disorders, based on recent experimental studies of temporal lobe epilepsy (TLE and absence seizures and on the identifi cation of mutations in GABAA receptor subunit genes underlying familial forms of epilepsy.

  20. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  1. Engineered zircaloy cladding modifications for improved accident tolerance of LWR fuel: US DOE NEUP Integrated Research Project

    International Nuclear Information System (INIS)

    Heuser, Brent

    2013-01-01

    An integrated research project (IRP) to fabricate and evaluate modified zircaloy LWR cladding under normal BWR/PWR operation and off-normal events has been funded by the US DOE. The IRP involves three US academic institutions, a US national laboratory, an intermediate stock industrial cladding supplier, and an international academic institution. A combination of computational and experimental protocols will be employed to design and test modified zircaloy cladding with respect to corrosion and accelerated oxide growth, the former associated with normal operation, the latter associated with steam exposure during loss of coolant accidents (LOCAs) and low-pressure core re-floods. Efforts will be made to go beyond design-base accident (DBA) scenarios (cladding temperature equal to or less than 1204 deg. C) during the experimental phase of modified zircaloy performance characterisation. The project anticipates the use of the facilities at ORNL to achieve steam exposure beyond DBA scenarios. In addition, irradiation of down-selected modified cladding candidates in the ATR may be performed. Cladding performance evaluation will be incorporated into a reactor system modelling effort of fuel performance, neutronics, and thermal hydraulics, thereby providing a holistic approach to accident-tolerant nuclear fuel. The proposed IRP brings together personnel, facilities, and capabilities across a wide range of technical areas relevant to the study of modified nuclear fuel and LWR performance during normal operation and off-normal scenarios. Two pathways towards accident-tolerant LWR fuel are envisioned, both based on the modification of existing zircaloy cladding. The first is the modification of the cladding surface by the application of a coating layer designed to shift the M + O→MO reaction away from oxide growth during steam exposure at elevated temperatures. This pathway is referred to as the 'surface coating' solution. The second is the modification of the bulk

  2. Reprint of "CON4EI: Bovine Corneal Opacity and Permeability (BCOP) test for hazard identification and labelling of eye irritating chemicals".

    Science.gov (United States)

    Verstraelen, Sandra; Maglennon, Gareth; Hollanders, Karen; Boonen, Francis; Adriaens, Els; Alépée, Nathalie; Drzewiecka, Agnieszka; Gruszka, Katarzyna; Kandarova, Helena; Willoughby, Jamin A; Guest, Robert; Schofield, Jane; Van Rompay, An R

    2018-06-01

    Assessment of ocular irritation potential is an international regulatory requirement in the safety evaluation of industrial and consumer products. None in vitro ocular irritation assays are capable of fully categorizing chemicals as stand-alone. Therefore, the CEFIC-LRI-AIMT6-VITO CON4EI consortium assessed the reliability of eight in vitro test methods and computational models as well as established a tiered-testing strategy. One of the selected assays was Bovine Corneal Opacity and Permeability (BCOP). In this project, the same corneas were used for measurement of opacity using the OP-KIT, the Laser Light-Based Opacitometer (LLBO) and for histopathological analysis. The results show that the accuracy of the BCOP OP-KIT in identifying Cat 1 chemicals was 73.8% while the accuracy was 86.3% for No Cat chemicals. BCOP OP-KIT false negative results were often related to an in vivo classification driven by conjunctival effects only. For the BCOP LLBO, the accuracy in identifying Cat 1 chemicals was 74.4% versus 88.8% for No Cat chemicals. The BCOP LLBO seems very promising for the identification of No Cat liquids but less so for the identification of solids. Histopathology as an additional endpoint to the BCOP test method does not reduce the false negative rate substantially for in vivo Cat 1 chemicals. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  4. US Department of Energy (DOE)/Gosatomnadzor (GAN) of Russia project at the Petersburg Nuclear Physics Institute (PNPI)

    International Nuclear Information System (INIS)

    Baranov, I.A.; Konoplev, K.A.; Hauser, G.C.

    1997-01-01

    This paper presents a summary of work accomplished within the scope of the DOE-Gosatomnadzor (GAN) Agreement to reduce vulnerability to theft of direct-use nuclear materials in Russia. The DOE-GAN agreement concerns the Russian Academy of Science B.P. Konstantinov Petersburg Nuclear Physics Institute (PNPI), located 45 kilometers from St. Petersburg. The PNPI operates facilities to research basic nuclear physics. Current world conditions require particular attention to the issue of Material Protection, Control, and Accounting (MPC ampersand A) of nuclear materials. The long-term plan to increase security at the facility is outlined, including training, physical protection upgrades, and material control and accountability. 4 figs

  5. The Development, Content, Design, and Conduct of the 2011 Piloted US DOE Nuclear Criticality Safety Program Criticality Safety Engineering Training and Education Project

    International Nuclear Information System (INIS)

    Hopper, Calvin Mitchell

    2011-01-01

    In May 1973 the University of New Mexico conducted the first nationwide criticality safety training and education week-long short course for nuclear criticality safety engineers. Subsequent to that course, the Los Alamos Critical Experiments Facility (LACEF) developed very successful 'hands-on' subcritical and critical training programs for operators, supervisors, and engineering staff. Since the inception of the US Department of Energy (DOE) Nuclear Criticality Technology and Safety Project (NCT and SP) in 1983, the DOE has stimulated contractor facilities and laboratories to collaborate in the furthering of nuclear criticality as a discipline. That effort included the education and training of nuclear criticality safety engineers (NCSEs). In 1985 a textbook was written that established a path toward formalizing education and training for NCSEs. Though the NCT and SP went through a brief hiatus from 1990 to 1992, other DOE-supported programs were evolving to the benefit of NCSE training and education. In 1993 the DOE established a Nuclear Criticality Safety Program (NCSP) and undertook a comprehensive development effort to expand the extant LACEF 'hands-on' course specifically for the education and training of NCSEs. That successful education and training was interrupted in 2006 for the closing of the LACEF and the accompanying movement of materials and critical experiment machines to the Nevada Test Site. Prior to that closing, the Lawrence Livermore National Laboratory (LLNL) was commissioned by the US DOE NCSP to establish an independent hands-on NCSE subcritical education and training course. The course provided an interim transition for the establishment of a reinvigorated and expanded two-week NCSE education and training program in 2011. The 2011 piloted two-week course was coordinated by the Oak Ridge National Laboratory (ORNL) and jointly conducted by the Los Alamos National Laboratory (LANL) classroom education and facility training, the Sandia National

  6. DOE ZERH Case Study: Carl Franklin Homes, L.C./Green Extreme Homes, CDC, McKinley Project, Garland TX

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-09-01

    Case study of a DOE 2015 Housing Innovation Award winning affordable home in the hot-humid climate that got a HERS 56 without PV or HERS 26 with PV, with 4.5” SIP walls and 8.5” SIP roof; uninsulated slab; ductless minisplit heat pump 15.5 SEER, and tankless hot water.

  7. Biochemical and Structural Analysis of an Eis Family Aminoglycoside Acetyltransferase from Bacillus anthracis

    Energy Technology Data Exchange (ETDEWEB)

    Green, Keith D.; Biswas, Tapan; Chang, Changsoo; Wu, Ruiying; Chen, Wenjing; Janes, Brian K.; Chalupska, Dominika; Gornicki, Piotr; Hanna, Philip C.; Tsodikov, Oleg V.; Joachimiak, Andrzej; Garneau-Tsodikova, Sylvie

    2015-05-26

    Proteins from the enhanced intracellular survival (Eis) family are versatile acetyltransferases that acetylate amines at multiple positions of several aminoglycosides (AGs). Their upregulation confers drug resistance. Homologues of Eis are present in diverse bacteria, including many pathogens. Eis from Mycobacterium tuberculosis (Eis_Mtb) has been well characterized. In this study, we explored the AG specificity and catalytic efficiency of the Eis family protein from Bacillus anthracis (Eis_Ban). Kinetic analysis of specificity and catalytic efficiency of acetylation of six AGs indicates that Eis_Ban displays significant differences from Eis_Mtb in both substrate binding and catalytic efficiency. The number of acetylated amines was also different for several AGs, indicating a distinct regiospecificity of Eis_Ban. Furthermore, most recently identified inhibitors of Eis_Mtb did not inhibit Eis_Ban, underscoring the differences between these two enzymes. To explain these differences, we determined an Eis_Ban crystal structure. The comparison of the crystal structures of Eis_Ban and Eis_Mtb demonstrates that critical residues lining their respective substrate binding pockets differ substantially, explaining their distinct specificities. Our results suggest that acetyltransferases of the Eis family evolved divergently to garner distinct specificities while conserving catalytic efficiency, possibly to counter distinct chemical challenges. The unique specificity features of these enzymes can be utilized as tools for developing AGs with novel modifications and help guide specific AG treatments to avoid Eis-mediated resistance.

  8. Does Patients’ Attachment Style Affect their Help-Seeking in relation to Cancer-Related Symptoms? – project protocol

    DEFF Research Database (Denmark)

    Andersen, Christina Maar; Pedersen, Anette Fischer; Olesen, Frede

    to be able to contribute as an explanatory model. This theory describes the evolutionary and developmental origin of patterns of close interpersonal relationships OBJECTIVE: The aims of the present project are to examine whether attachment styles in general practitioners as well as in their patients......: If the results of the project show a correlation between delay in the diagnostic process and patients’ and or general practitioners’ attachment styles, this knowledge will be highly relevant in medical education and specialty training in general medicine....

  9. Washington Windplant No. 1: Botanical resources field survey. Appendix B to Washington Windplant No. 1 EIS

    International Nuclear Information System (INIS)

    1994-12-01

    KENETECH Windpower, Inc., has applied to Klickitat County for a conditional use permit to construct and operate a 115 Megawatt windfarm on an approximately 5110 hectare (12,630 acre) site in the Columbia Hills near Goldendale, Washington. A transmission services agreement between the Bonneville Power Administration (BPA) and utilities purchasing the Project's output will also be required. Klickitat County and BPA initiated the preparation of a joint SEPA/NEPA Environmental Impact Statement, under the authority of the Washington State Environmental Policy Act and the National Environmental Policy Act. The EIS addresses, among other issues, the Project's potential impact on rare, threatened or endangered, and sensitive plant species and communities as well as plant species of potential cultural importance. A field survey along potential impact corridors (turbine strings, roadways, and the transmission line alignment) was conducted between April and June, 1994 in order to identify rare plant species, high-quality native plant communities, and plant species of potential cultural importance present in these corridors. In addition, habitat maps of the entire 5110-ha project area were field verified. This report contains the results of that survey and an assessment of the potential project impacts

  10. Retrospective evaluation of exposure index (EI) values from plain radiographs reveals important considerations for quality improvement

    International Nuclear Information System (INIS)

    Mothiram, Ursula; Brennan, Patrick C; Robinson, John; Lewis, Sarah J; Moran, Bernadette

    2013-01-01

    Following X-ray exposure, radiographers receive immediate feedback on detector exposure in the form of the exposure index (EI). To identify whether radiographers are meeting manufacturer-recommended EI (MREI) ranges for routine chest, abdomen and pelvis X-ray examinations under a variety of conditions and to examine factors affecting the EI. Data on 5000 adult X-ray examinations including the following variables were collected: examination parameters, EI values, patient gender, date of birth, date and time of examination, grid usage and the presence of implant or prosthesis. Descriptive statistics were used to summarize each data set and the Mann–Whitney U test was used to determine significant differences, with P < 0.05 indicating significance for all tests. Most examinations demonstrated EI values that were outside the MREI ranges, with significantly higher median EI values recorded for female patient radiographs than those for male patients for all manufacturers, indicating higher detector exposures for all units except for Philips digital radiography (DR), where increased EI values indicate lower exposure (P = 0.01). Median EI values for out of hours radiography were also significantly higher compared with normal working hours for all technologies (P ≤ 0.02). Significantly higher median EI values were demonstrated for Philips DR chest X-rays without as compared to those with the employment of a grid (P = 0.03), while significantly lower median EI values were recorded for Carestream Health computed radiography (CR) chest X-rays when an implant or prosthesis was present (P = 0.02). Non-adherence to MREIs has been demonstrated with EI value discrepancies being dependent on patient gender, time/day of exposure, grid usage and the presence of an implant or prosthesis. Retrospective evaluation of EI databases is a valuable tool to assess the need of quality improvement in routine DR

  11. Retrospective evaluation of exposure index (EI) values from plain radiographs reveals important considerations for quality improvement

    Energy Technology Data Exchange (ETDEWEB)

    Mothiram, Ursula; Brennan, Patrick C; Robinson, John; Lewis, Sarah J [Medical Imaging Optimisation and Perception Group (MIOPeG), Discipline of Medical Radiation Sciences, Faculty of Health Science, University of Sydney, Sydney (Australia); Moran, Bernadette [Department of Clinical Medicine, Trinity College Dublin, Dublin (Ireland); Medical Imaging Optimisation and Perception Group (MIOPeG), Discipline of Medical Radiation Sciences, Faculty of Health Science, University of Sydney, Sydney (Australia)

    2013-12-15

    Following X-ray exposure, radiographers receive immediate feedback on detector exposure in the form of the exposure index (EI). To identify whether radiographers are meeting manufacturer-recommended EI (MREI) ranges for routine chest, abdomen and pelvis X-ray examinations under a variety of conditions and to examine factors affecting the EI. Data on 5000 adult X-ray examinations including the following variables were collected: examination parameters, EI values, patient gender, date of birth, date and time of examination, grid usage and the presence of implant or prosthesis. Descriptive statistics were used to summarize each data set and the Mann–Whitney U test was used to determine significant differences, with P < 0.05 indicating significance for all tests. Most examinations demonstrated EI values that were outside the MREI ranges, with significantly higher median EI values recorded for female patient radiographs than those for male patients for all manufacturers, indicating higher detector exposures for all units except for Philips digital radiography (DR), where increased EI values indicate lower exposure (P = 0.01). Median EI values for out of hours radiography were also significantly higher compared with normal working hours for all technologies (P ≤ 0.02). Significantly higher median EI values were demonstrated for Philips DR chest X-rays without as compared to those with the employment of a grid (P = 0.03), while significantly lower median EI values were recorded for Carestream Health computed radiography (CR) chest X-rays when an implant or prosthesis was present (P = 0.02). Non-adherence to MREIs has been demonstrated with EI value discrepancies being dependent on patient gender, time/day of exposure, grid usage and the presence of an implant or prosthesis. Retrospective evaluation of EI databases is a valuable tool to assess the need of quality improvement in routine DR.

  12. A Facebook Project for Japanese University Students (2): Does It Really Enhance Student Interaction, Learner Autonomy, and English Abilities?

    Science.gov (United States)

    Hamada, Mayumi

    2013-01-01

    Facebook is, in most countries, a very popular Social Network Service (SNS). Since the launch of its service in Japan in 2008, it has been growing rapidly. As a platform for a link to the world, Facebook can also be used effectively for language learning in English as a foreign language (EFL) environments. The purpose of this project was to…

  13. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    1996-01-01

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  14. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  15. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  16. Does SSP Plus Increase Employment? The Effect of Adding Services to the Self-Sufficiency Project's Financial Incentives.

    Science.gov (United States)

    Quets, Gail; Robins, Philip K.; Pan, Elsie C.; Michalopoulos, Charles; Card, David

    In 1992, Human Resources Development Canada launched the Self-Sufficiency Project (SSP), which was a research and demonstration effort involving long-term, single-parent Income Assistance (IA) recipients in New Brunswick and British Columbia. Under SSP, IA recipients who left IA and worked at least 30 hours per week were offered a generous but…

  17. How Does Heat Flow Vary in the Ocean Floor? Crustal Evaluation Education Project. Teacher's Guide [and] Student Investigation.

    Science.gov (United States)

    Stoever, Edward C., Jr.

    Crustal Evolution Education Project (CEEP) modules were designed to: (1) provide students with the methods and results of continuing investigations into the composition, history, and processes of the earth's crust and the application of this knowledge to man's activities and (2) to be used by teachers with little or no previous background in the…

  18. [Review comments on the Draft DOE Area Recommendation Report for the Crystalline Repository Project]: Final technical report

    International Nuclear Information System (INIS)

    Dutch, S.I.; Stiegliltz, R.D.

    1986-03-01

    Research performed under the grant primarily involved review and comment on the Draft Area Recommendations Report (DARR). However, because data and ''recommendations'' included in the DARR are unquestionably tied to years of research and dozens of technical reports and documents, i.e., Screening Methodologies, Regional characterization Reports, etc., it is essential that consultants to the Menominee Tribe review all the relevant DOE documents, working papers, etc. Given the short period provided for technical comment and limited funds available to the Tribe, a well designed and thorough technical review was (and is) without question impossible. What review and comment that did occur on a geotechnical level is included in this report

  19. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS : Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described. The document concludes with an evaluation of the potential effects that could result from implementing proposed actions. The conclusions are based on evaluation of existing data, utilization of numerical models, and application of logical inference. This volume contains the appendices.

  20. 1992 Columbia River salmon flow measures Options Analysis/EIS: Appendices

    International Nuclear Information System (INIS)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described. The document concludes with an evaluation of the potential effects that could result from implementing proposed actions. The conclusions are based on evaluation of existing data, utilization of numerical models, and application of logical inference. This volume contains the appendices

  1. Planeeringut ei saadud 8 päevaga

    Index Scriptorium Estoniae

    2010-01-01

    Tartu Ringkonnakohtu otsusest Ain Seppiku, Sulev Seppiku ja Siim Seppiku ning ajalehe Äripäev vahel. Äripäev lükkab ümber andmed selle kohta, nagu oleks nn Antennideväljaku krundi detailplaneering kehtestatud 8 päevaga. Vastukaja artiklitele: Soe, Ralf-Martin. Sulev Seppik tegi Viimsis imet. // Äripäev (2007/Mar/1), lk. 4-5 ; Arumäe, Urmas. Viimsi võim ei tegele maaäriga. // Äripäev (2007/Mar/13), lk. 27 ; Soe, Ralf-Martin. Viimsi võtmeisikute tehingutel kahtlane maik. // Äripäev (2007/Mar/23), lk. 12-13

  2. Corrosion behavior of boride layers evaluated by the EIS technique

    Energy Technology Data Exchange (ETDEWEB)

    Campos, I. [Instituto Politecnico Nacional. SEPI-ESIME U.P. Adolfo Lopez Mateos, Zacatenco, Mexico D.F. 07738 (Mexico)], E-mail: icampos@ipn.mx; Palomar-Pardave, M. [Universidad Autonoma Metropolitana-Azcapotzalco, Materials Department, Avenue San Pablo 180 Col. Reynosa Tamaulipas, Mexico D.F. 02200 (Mexico); Amador, A. [Tecnologico de Monterrey, Campus Ciudad de Mexico, Calle del Puente 222 Col. Ejidos de Huipulco, Mexico D.F. 14380 (Mexico); VillaVelazquez, C. [Instituto Politecnico Nacional. SEPI-ESIME U.P. Adolfo Lopez Mateos, Zacatenco, Mexico D.F. 07738 (Mexico); Hadad, J. [Tecnologico de Monterrey, Campus Ciudad de Mexico, Calle del Puente 222 Col. Ejidos de Huipulco, Mexico D.F. 14380 (Mexico)

    2007-09-30

    The corrosion behavior of boride layers at the AISI 304 steel surface is evaluated in the present study. Electrochemical impedance spectroscopy (EIS) technique was used for the evaluation of the polarization resistance at the steel surface, with the aid of AUTOLAB potentiostat. Samples were treated with boron paste thickness of 4 and 5 mm, in the range of temperatures 1123 {<=} T {<=} 1273 K and exposed time of 4 and 6 h. The electrochemical technique employed 10 mV AC with a frequency scan range from 8 kHz to 3 mHz in deaerated 0.1 M NaCl solution. Nyquist diagrams show that the highest values of corrosion resistance are present in the samples borided at the temperature of 1273 K, with treatment time of 4 h and 4 mm of boron paste thickness. The values of corrosion resistance on borided steels are compared with the porosity exhibited in the layers.

  3. Meie julgeolek ei ole automaatselt kindlustatud / Juhan Parts

    Index Scriptorium Estoniae

    Parts, Juhan, 1966-

    2004-01-01

    Ilmunud ka: Nädaline, 7. sept. 2004, lk. 2; Harjumaa, 7. sept. 2004, lk. 2; Järva Teataja, 7. sept. 2004, lk. 2; Lääne Elu, 7. sept. 2004, lk. 2; Sakala, 7. sept. 2004, lk. 2; Virumaa Teataja, 7. sept. 2004, lk. 7; Pärnu Postimees, 7. sept. 2004, lk. 15; Meie Maa, 7. sept. 2004, lk. 2; Vooremaa, 7. sept. 2004, lk. 2; Koit, 7. sept. 2004, lk. 6; Võrumaa Teataja, 7. sept. 2004, lk. 2; Hiiumaa, 7. sept. 2004, lk. 2. Lihula ausambast, selle sobimatusest rahvusvahelisse konteksti, meedia reageeringust. Minevikukäsitluses ei saa toetuda Teise maailmasõja aegsele Saksa armee mundrile, sest demokraatlikus maailmas samastub see natsismiga, tõdeb peaminister.

  4. DOES QUALITY IMPROVEMENT IMPROVE PATIENTS’ HEALTH? A SYSTEMATIC REVIEW OF MEASURES OF EFFECT USED IN PDSA PROJECTS

    DEFF Research Database (Denmark)

    Hermansen, Nanna Kastrup; Vestergaard, Anne Sig; Ehlers, Lars Holger

    , and if the authors provide scientific evidence that their choice of effect measure, i.e. the quality indicator, is associated with patients’ health. Methods The basis of the present study was a systematic review of studies on PDSA quality improvement projects published in 2015-2017. For all identified papers...... as such. Conclusion Process indicators, rather than health-related outcome measures, appear to be used most often in quality improvement projects applying the PDSA method. Evidence-based indicators were only applied in four studies. Overall, this challenges the ability to show if, and how, interventions......Abstract Introduction Quality improvement is an inherent part of modern healthcare systems worldwide, used for the continuous advancement in effectiveness and safety. Amongst other approaches, the plan-do-study-act (PDSA) method, a four-step iterative method, is widely used for testing...

  5. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58)

    Energy Technology Data Exchange (ETDEWEB)

    Barndt, Shawn L. [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-05-31

    Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of the facility. BPA proposes bare ground vegetation management at the microwave site. Bare ground management is needed to prevent fire damage and maintain a vegetation free environment on the site. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. The site will be checked 2-3 times during the growing season. Follow-up herbicide treatment will occur to eliminate any vegetation growing.

  6. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)

    Energy Technology Data Exchange (ETDEWEB)

    Hutchinson, Kenneth [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-07-19

    Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). BPA, in cooperation with the various County Noxious Weed Control Boards and associated landowners, will provide resources to assist landowners in controlling noxious weeds on the subject ROWs. The Weed Board will perform all activities on behalf of BPA.

  7. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74)

    Energy Technology Data Exchange (ETDEWEB)

    Howington, John [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-07-01

    Vegetation Management for five Substations in the Malin District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region.

  8. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82)

    Energy Technology Data Exchange (ETDEWEB)

    Howington, John [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-08-13

    Vegetation Management for twenty-four Substations in the Burley District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region.

  9. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78)

    Energy Technology Data Exchange (ETDEWEB)

    Howington, John [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-07-01

    Vegetation Management for ten Substations in the Redmond District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region.

  10. "Kui Eesti ütleb gaasitorule ei, võib ka Rootsi öelda ei" / Carl B. Hamilton ; interv. Argo Ideon

    Index Scriptorium Estoniae

    Hamilton, Carl B.

    2007-01-01

    Nord Stream on avaldanud soovi gaasijuhtme teenindusplatvormi rajamiseks Gotlandi juurde. Parlamendiliikme hinnangul peaks Rootsi valitsus ütlema ei nii teenindusplatvormile kui ka gaasitorule. Gaasijuhe on tema sõnul Venemaa projekt

  11. 76 FR 75554 - Notice of Availability of the Draft Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...

  12. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  13. 76 FR 39436 - Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and Notice of Scoping...

    Science.gov (United States)

    2011-07-06

    ...The Department of the Interior, Bureau of Reclamation (Reclamation) and the San Joaquin River Exchange Contractors Water Authority (Exchange Contractors) propose to prepare a joint EIS/EIR for a twenty-five year water transfer program (Program). The action would be to execute agreements for water transfers among Reclamation, Mid- Pacific Region; Central Valley Project (CVP) and State Water Project (SWP) contractors; and the Exchange Contractors for water service years 2014 to 2038. The Program would consist of the annual development and transfer of up to 150,000 acre-feet of substitute water (maximum of 100,000 acre-feet of conserved water and a maximum of 50,000 acre-feet from land fallowing) from the Exchange Contractors to other CVP contractors, to Reclamation's Refuge Water Supply Program (RWSP) for delivery to the San Joaquin Valley wetland habitat areas (wildlife refuges), and/or State Water Project (SWP) contractors.

  14. How does dynamical downscaling affect model biases and future projections of explosive extratropical cyclones along North America's Atlantic coast?

    Science.gov (United States)

    Seiler, C.; Zwiers, F. W.; Hodges, K. I.; Scinocca, J. F.

    2018-01-01

    Explosive extratropical cyclones (EETCs) are rapidly intensifying low pressure systems that generate severe weather along North America's Atlantic coast. Global climate models (GCMs) tend to simulate too few EETCs, perhaps partly due to their coarse horizontal resolution and poorly resolved moist diabatic processes. This study explores whether dynamical downscaling can reduce EETC frequency biases, and whether this affects future projections of storms along North America's Atlantic coast. A regional climate model (CanRCM4) is forced with the CanESM2 GCM for the periods 1981 to 2000 and 2081 to 2100. EETCs are tracked from relative vorticity using an objective feature tracking algorithm. CanESM2 simulates 38% fewer EETC tracks compared to reanalysis data, which is consistent with a negative Eady growth rate bias (-0.1 day^{-1}). Downscaling CanESM2 with CanRCM4 increases EETC frequency by one third, which reduces the frequency bias to -22%, and increases maximum EETC precipitation by 22%. Anthropogenic greenhouse gas forcing is projected to decrease EETC frequency (-15%, -18%) and Eady growth rate (-0.2 day^{-1}, -0.2 day^{-1}), and increase maximum EETC precipitation (46%, 52%) in CanESM2 and CanRCM4, respectively. The limited effect of dynamical downscaling on EETC frequency projections is consistent with the lack of impact on the maximum Eady growth rate. The coarse spatial resolution of GCMs presents an important limitation for simulating extreme ETCs, but Eady growth rate biases are likely just as relevant. Further bias reductions could be achieved by addressing processes that lead to an underestimation of lower tropospheric meridional temperature gradients.

  15. I. Final Report for DOE SBIR Phase I Project DE-SC0013795 Final Report for DOE SBIR Phase I Project DE-SC0013795 Microtron-based Compact, Portable Gamma-Ray Source

    Energy Technology Data Exchange (ETDEWEB)

    Abrams, Robert J. [Muons Inc., Batavia, IL (United States)

    2017-01-09

    Microtron-based Compact, Portable Gamma-Ray Source. The objective of Phase I of this project was to produce a conceptual design of a prototype compact microtron electron accelerator, which could be designed, built, and demonstrated in Phase II of the project. The conceptual design study included an analysis of the parameters of the microtron and its components, and the expected performance of the prototype microtron as a source of x-rays and/or RF neutrons in the MeV energy range. The major components of the microtron are the magnet, the accelerating system, the power system, the vacuum system, the control system, the beam extraction system and the targets to produce x-rays (and/or neutrons). Our objectives for the design of the prototype were for it to be compact, cost-effective, capable of producing high intensity x-ray (an/or neutron) fluxes. In addition, the prototype was to be easily assembled and disassembled so that components could be easily replaced. The main parameters for the prototype are the following: the range of electron kinetic energies, the output power, the RF frequency band (X-band, C-band, or S-Band), the type of injection (Type I or Type II), the magnet type, i.e. permanent magnet, electromagnet, or a hybrid combination of permanent and electromagnet. The results of the Phase I study and analysis for a prototype microtron are the following: The electron energy range can be varied from below 6 MeV to 9 MeV, the optimal frequency range is S-Band (2-4 GHz) RF frequency, Type II injection (described below), and the magnet type is the hybrid version. The prototype version will be capable of producing gamma ray doses of ~1800 R/min-m and neutron fluxes of up to ~6 x 1010 n/s with appropriate targets. The results of the Phase I study and analysis are provided below. The proposed Phase II plan was to demonstrate the prototype at low beam power. In the subsequent Phase III, high power tests would be performed, and the design of commercial

  16. Loeb või ei loe : mis teeb ITst tarbekauba? / Enrique Dans

    Index Scriptorium Estoniae

    Dans, Enrique

    2004-01-01

    Vastukajad ajakirja Think! 2003. aasta 2. numbris avaldatud Nicholas Carr'i artiklile "IT ei loe". Autor ei nõustu enamike N. Carr'i järeldustega IT-st kui tarbekaubast ja esitab IT innovatsiooni kolmetasemelise mudeli

  17. Expanding entrepreneurial, innovative and sustainable (EIS) ecosystems: A cultural-historical activity theory perspective

    NARCIS (Netherlands)

    Audhoe, Romano; Thompson, N.A.; Verduyn, Karen; Leitão, João; Alves, Helena; Krueger, Norris; Park, Jacob

    2018-01-01

    The value of Entrepreneurial, Innovative and Sustainable (EIS) ecosystems has seen increasing recognition from policymakers and researchers alike. Like-minded policymakers employing New Public Management (NPM) understand that the intricate links between diverse EIS stakeholders play a vital role in

  18. Does power mobility training impact a child's mastery motivation and spectrum of EEG activity? An exploratory project.

    Science.gov (United States)

    Kenyon, Lisa K; Farris, John P; Aldrich, Naomi J; Rhodes, Samhita

    2017-08-30

    The purposes of this exploratory project were: (1) to evaluate the impact of power mobility training with a child who has multiple, severe impairments and (2) to determine if the child's spectrum of electroencephalography (EEG) activity changed during power mobility training. A single-subject A-B-A-B research design was conducted with a four-week duration for each phase. Two target behaviours were explored: (1) mastery motivation assessed via the dimensions of mastery questionnaire (DMQ) and (2) EEG data collected under various conditions. Power mobility skills were also assessed. The participant was a three-year, two-month-old girl with spastic quadriplegic cerebral palsy, gross motor function classification system level V. Each target behaviour was measured weekly. During intervention phases, power mobility training was provided. Improvements were noted in subscale scores of the DMQ. Short-term and long-term EEG changes were also noted. Improvements were noted in power mobility skills. The participant in this exploratory project demonstrated improvements in power mobility skill and function. EEG data collection procedures and variability in an individual's EEG activity make it difficult to determine if the participant's spectrum of EEG activity actually changed in response to power mobility training. Additional studies are needed to investigate the impact of power mobility training on the spectrum of EEG activity in children who have multiple, severe impairments. Implications for Rehabilitation Power mobility training appeared to be beneficial for a child with multiple, severe impairments though the child may never become an independent, community-based power wheelchair user. Electroencephalography may be a valuable addition to the study of power mobility use in children with multiple, severe impairments. Power mobility training appeared to impact mastery motivation (the internal drive to solve complex problems and master new skills) in a child who has multiple

  19. Cleanup protocols when encountering thorium-230 at U.S. DOE Uranium Mill Tailings Remedial Action (UMTRA) Project sites

    International Nuclear Information System (INIS)

    Miller, M.L.; Hylko, J.M.; Cornish, R.E.

    1995-01-01

    The passage of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, established the regulatory framework, under which the US EPA charged with developing standards for the cleanup and disposal of tailings at 24 designated inactive uranium processing sites located in 10 states. 40 CFR 192.12 requires that the concentration of Ra-226 in land averaged over any area of 100 square meters shall not exceed the background level by more than 5 pCi/g, averaged over the first 15 cm of soil below the surface, 15 pCi/g, averaged over 15-cm-thick layers of soils more than 15 cm below the surface. However, Th-230 is not specifically addressed by the EPA in 40 CFR 192.12, which naturally decays with a half-life of 77,000 years to form Ra-226. Consequently, the cleanup of the initial Ra-226 contamination according to the standards will not necessarily mitigate against the eventual ingrowth of residual Ra-226 with time, due to the radioactive decay of residual Th-230. Therefore, to direct the excavation of residual Th-230, four generic protocols are being used at Uranium Mill Tailings Remedial Action (UMTRA) Project sites, as follows: Determining the allowable remaining concentration of Th-230 in surface and subsurface soils; Encountering Th-230 contamination in the unsaturated subsurface soil; Encountering Th-230 contamination in the saturated zone; and Verification sampling. The four generic protocols, developed in conjunction with the supplemental standards provision, ensure protection of the general public by reducing exposures to levels that are As Low As Reasonably Achievable, while considering practical measures necessary to excavate Th-230 under conditions encountered at the UMTRA Project site

  20. How does a Collaborative Community Affect Diverse Students' Engagement with an Open Source Software Project: A Pedagogical Paradigm

    Science.gov (United States)

    Morgan, Becka S.

    Open Source Software (OSS) communities are homogenous and their lack of diversity is of concern to many within this field. This problem is becoming more pronounced as it is the practice of many technology companies to use OSS participation as a factor in the hiring process, disadvantaging those who are not a part of this community. We should expect that any field would have a population that reflects the general population given no constraints. The constraints within OSS are documented as being a hostile environment for women and minorities to participate in. Additionally OSS communities rely predominately on volunteers to create and maintain source code, documentation, and user interface as well as the organizational structure of the project. The volunteer nature of OSS projects creates a need for an ongoing pool of participants. This research addresses the lack of diversity along with the continual need for new members by developing a pedagogical paradigm that uses a collaborative environment to promote participation in an OSS project by diverse students. This collaborative environment used a Communities of Practice (CoP) framework to design the course, the indicators of which were used to operationalize the collaboration. The outcomes of this course not only benefit the students by providing them with skills necessary to continue participation and experience for getting a job, but also provide a diverse pool of volunteers for the OSS community. This diverse pool shows promise of creating a more diverse culture within OSS. In the development of this pedagogical paradigm this research looked primarily at student's perception of the importance of their group members and mentors provided to guide their participation in and contribution to an OSS community. These elements were used to facilitate the formation of a CoP. Self-efficacy was also used as a measure; an increase in self-efficacy is associated with the successful formation of a CoP. Finally the intent to

  1. The consequences of disposal of low-level radioactive waste from the Fernald Environmental Management Project: Report of the DOE/Nevada Independent Panel

    International Nuclear Information System (INIS)

    Crowe, B.; Hansen, W.; Waters, R.; Sully, M.; Levitt, D.

    1998-04-01

    The Department of Energy (DOE) convened a panel of independent scientists to assess the performance impact of shallow burial of low-level radioactive waste from the Fernald Environmental Management Project, in light of a transportation incident in December 1997 involving this waste stream. The Fernald waste has been transported to the Nevada Test Site and disposed in the Area 5 Radioactive Waste Management Site (RWMS) since 1993. A separate DOE investigation of the incident established that the waste has been buried in stress-fractured metal boxes, and some of the waste contained excess moisture (high-volumetric water contents). The Independent Panel was charged with determining whether disposition of this waste in the Area 5 RWMS has impacted the conclusions of a previously completed performance assessment in which the site was judged to meet required performance objectives. To assess the performance impact on Area 5, the panel members developed a series of questions. The three areas addressed in these questions were (1) reduced container integrity, (2) the impact of reduced container integrity on subsidence of waste in the disposal pits and (3) excess moisture in the waste. The panel has concluded that there is no performance impact from reduced container integrity--no performance is allocated to the container in the conservative assumptions used in performance assessment. Similarly, the process controlling post-closure subsidence results primarily from void space within and between containers, and the container is assumed to degrade and collapse within 100 years

  2. Advanced Seismic Data Analysis Program (The Hot Pot Project), DOE Award: DE-EE0002839, Phase 1 Report

    Energy Technology Data Exchange (ETDEWEB)

    Oski Energy, LLC,

    2013-03-28

    A five-line (23 mile) reflection- seismic survey was conducted at the Hot Pot geothermal prospect area in north-central Nevada under the USDOE (United States Department of Energy) Geothermal Technologies Program. The project objective was to utilize innovative seismic data processing, integrated with existing geological, geophysical and geochemical information, to identify high-potential drilling targets and to reduce drilling risk. Data acquisition and interpretation took place between October 2010 and April 2011. The first round of data processing resulted in large areas of relatively poor data, and obvious reflectors known from existing subsurface information either did not appear on the seismic profiles or appeared at the wrong depth. To resolve these issues, the velocity model was adjusted to include geologic input, and the lines were reprocessed. The resulting products were significantly improved, and additional detail was recovered within the high-velocity and in part acoustically isotropic basement. Features visible on the improved seismic images include interpreted low angle thrust faults within the Paleozoic Valmy Formation, which potentially are reactivated in the current stress field. Intermediate-depth wells are currently targeted to test these features. The seismic images also suggest the existence of Paleogene sedimentary and volcanic rocks which potentially may function as a near- surface reservoir, charged by deeper structures in Paleozoic rocks.

  3. CDW-EIS theoretical calculations of projectile deflection for single ionization in highly charged ion-atom collisions

    International Nuclear Information System (INIS)

    Rodriguez, V.D.

    2003-01-01

    We present continuum distorted wave-eikonal initial state (CDW-EIS) theoretical calculations for the projectile deflection in single ionization of helium by heavy-ion impact as a function of ionized electron energies. These calculations account for the helium passive electron shielding in the internuclear interaction improving standard CDW-EIS theory. The results are compared with recent experimental results by impact of 100 MeV/amu C 6+ and 3.6 MeV/amu Au 53+ . For highly charged projectiles there is a poor quantitative agreement between theory and experiment. However, this refined calculation does share some qualitative features with the data. In particular the variation of the effective charge of the residual He + ion from Z eff =1 to Z eff =2 when going from small to large projectile scattering angles is able to represent a shoulder observed in the double differential cross sections. Important qualitative differences are observed at the level of triple differential cross sections

  4. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  5. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  6. 78 FR 54871 - Notice of Amendment to the Notice of Intent To Prepare an Environmental Impact Statement (EIS...

    Science.gov (United States)

    2013-09-06

    ... alternatives and a ``no action'' alternative in the EIS. An EIS will be prepared to assess the potential social... archeological resources; air and water quality; noise; recreation; land use; and aesthetics. c. The Corps will...

  7. Current source enhancements in Electrical Impedance Spectroscopy (EIS) to cancel unwanted capacitive effects

    Science.gov (United States)

    Zarafshani, Ali; Bach, Thomas; Chatwin, Chris; Xiang, Liangzhong; Zheng, Bin

    2017-03-01

    Electrical Impedance Spectroscopy (EIS) has emerged as a non-invasive imaging modality to detect and quantify functional or electrical properties related to the suspicious tumors in cancer screening, diagnosis and prognosis assessment. A constraint on EIS systems is that the current excitation system suffers from the effects of stray capacitance having a major impact on the hardware subsystem as the EIS is an ill-posed inverse problem which depends on the noise level in EIS measured data and regularization parameter in the reconstruction algorithm. There is high complexity in the design of stable current sources, with stray capacitance reducing the output impedance and bandwidth of the system. To confront this, we have designed an EIS current source which eliminates the effect of stray capacitance and other impacts of the capacitance via a variable inductance. In this paper, we present a combination of operational CCII based on a generalized impedance converter (OCCII-GIC) with a current source. The aim of this study is to use the EIS system as a biomedical imaging technique, which is effective in the early detection of breast cancer. This article begins with the theoretical description of the EIS structure, current source topologies and proposes a current conveyor in application of a Gyrator to eliminate the current source limitations and its development followed by simulation and experimental results. We demonstrated that the new design could achieve a high output impedance over a 3MHz frequency bandwidth when compared to other types of GIC circuits combined with an improved Howland topology.

  8. CALIFICAREA JURIDICO-PENALĂ A VIOLENŢEI SEXUALE ASUPRA FEMEILOR CA FORMĂ DISTINCTĂ A VIOLENŢEI ÎN FAMILIE

    OpenAIRE

    Nicolae CORCEA

    2016-01-01

    Scopul acestui mesaj ştiinţific constă în rezolvarea controverselor doctrinare în domeniul calificării infracţiunii de violenţă în familie în una din formele ei speciale, cum ar fi violenţa sexuală. Cu toate că violenţa sexuală nu este prevă­zută expres de către legiuitor ca o formă distinctă a violenţei în familie, aceasta devine un fenomen extrem de răspândit. Autorul analizează violenţa împotriva femeilor bazată pe gen, arată caracterul discriminator al violenţei în familie îm­pot­riva fem...

  9. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  10. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  11. Maa, mis on ja mida ei ole / Õnne Kepp

    Index Scriptorium Estoniae

    Kepp, Õnne

    2006-01-01

    Gustav Suitsu 1913. aastal ilmunud luulekogust "Tuulemaa". Tuulemaa kujundit kasutatakse Eestimaa sünonüümina, ühtaegu nii reaalse maana kui ka irreaalse paigana, mida ei eksisteeri, mida pole olemas

  12. Iraani filmimeister ei pääse Berliini festivali žüriisse / Andres Laasik

    Index Scriptorium Estoniae

    Laasik, Andres, 1960-2016

    2011-01-01

    10.-20. veebruarini toimuva 61. Berliini rahvusvahelise filmifestivali žüriis ei saa osaleda iraani filmirežissöör Jafar Panahi, kellel on kohtuasi pooleli. Rahvusvahelist žüriid juhib Isabella Rossellini

  13. Väljaöeldut tagasi võtta ei saa / Raivo Uukkivi

    Index Scriptorium Estoniae

    Uukkivi, Raivo, 1962-

    2007-01-01

    Õpetaja suhtumisest õpilasse. Õpetaja professionaalsusest ja tema missioonitundest. Vastukaja artiklile: Krull, Edgar. Kõvad seadused ja politsei ei vabasta kohustusest kasvatada // Õpetajate Leht (2007) 16. veebr., lk. 5. Jüri Gümnaasiumi koolikonfliktist

  14. Aiandusäri jahtumismärke ei ilmuta / Aive Herja

    Index Scriptorium Estoniae

    Herja, Aive

    2008-01-01

    Haljastus- ja aiandusäri praegu veel jahtumismärke ei ilmuta. Arvamust avaldavad aiandusettevõtete juhid. Lk. 28 intervjuu maastikuarhitektuurifirma Artes Terrae OÜ juhatuse liikme Sulev Nurmega "Sulev Nurme: maastikuarhitektuuri turg on kasvutrendis"

  15. Euroopa naabruspoliitika ei ole viisakas äraütlemine / Marianne Mikko

    Index Scriptorium Estoniae

    Mikko, Marianne, 1961-

    2006-01-01

    Euroopa Parlamendi liikme sõnul reageeris europarlament Transnistria rahvahääletusele resolutsiooniga, andes märku, et ei tunnusta separatiste, nende korraldatud rahvahääletusi ega hääletustulemusi

  16. Peaminister Juhan Parts ei plaani ametit maha panna / Juhan Parts ; interv. Toomas Sildam

    Index Scriptorium Estoniae

    Parts, Juhan, 1966-

    2004-01-01

    Peaminister Juhan Parts pooldab paremerakondade ühinemist, ei kavatse ametist lahkuda ning peab valitsuse üheks ülesandeks rahvaarutelu algatamist vabaduse samba üle. Lisa: Ene Ergma kõnest Riigikogus (13.09.2004)

  17. Edgar Savisaar : Mina ei anna mitte mingit hinnangut / Edgar Savisaar ; interv. Dannar Leitmaa, Holger Roonemaa

    Index Scriptorium Estoniae

    Savisaar, Edgar, 1950-

    2008-01-01

    Tallinna linnapea vastused linnavalitsuse pressikonverentsil küsimustele, mis puudutasid Keskerakonna suurrahastaja Oliver Kruuda omavolilist ehitamist Nõmmel. Vt. samas: Holger Roonemaa. Inspektorid ei pannud Kruuda tegevust tähele

  18. Endine turujuht end süüdi ei tunnistanud / Hannes Krause

    Index Scriptorium Estoniae

    Krause, Hannes

    2005-01-01

    Vadim Polishtshuk, keda süüdistatakse koos kahe kaaslasega Mait Metsamaa mõrvaprotsessi peamise tunnistaja ähvardamise ja mõjutamise katses, ei tunnistanud end 19. septembril Tallinna linnakohtus alanud protsessil süüdi

  19. Kultuur isiksuse psühholoogiat ei mõjuta / Tiit Kändler

    Index Scriptorium Estoniae

    Kändler, Tiit, 1948-

    2010-01-01

    Psühholoogia uuemate andmete kohaselt ei sõltu indiviidi seadumus kultuurist, soost, vanusest, haridusest. Eesti psühholoogide Jüri Alliku ja Ann Realo osalusel ajakirjas "Journal Personality and Social Psychology" ilmunud artiklist

  20. Kultuur isiksuse psühholoogiat ei mõjuta / Tiit Kändler

    Index Scriptorium Estoniae

    Kändler, Tiit, 1948-

    2005-01-01

    Psühholoogia uuemate andmete kohaselt ei sõltu indiviidi seadumus kultuurist, soost, vanusest, haridusest. Eesti psühholoogide Jüri Alliku ja Anu Realo osalusel ajakirjas "Journal Personality and Social Psychology" ilmunud artiklist

  1. Eesti põllumajanduspoliitika ja WTO leping ei vasta Eesti rahvuslikele huvidele / Janno Reiljan

    Index Scriptorium Estoniae

    Reiljan, Janno, 1951-2018

    2001-01-01

    Eesti liitus Maailma Kaubandusorganisatsiooniga (WTO) endale ebasoodsatel tingimustel, mis ei võimalda meie põllumajandustoodetel välisturul konkureerida. Tabel: Eesti väliskaubandus põllumajandussaadustega. Autor: ERL. Parlamendisaadik

  2. Eesti majandust ei saa rajada võõrtööjõule / Piret Pert

    Index Scriptorium Estoniae

    Pert, Piret

    2006-01-01

    Eesti Ametiühingute Keskliidu, Teenistujate Ametiliitude Organisatsiooni ja Sotsiaaldemokraatliku Erakonna juhtide kohtumisel leiti, et võõrtööjõud ei ole Eestile lahendus. Harri Taliga, Eiki Nestori ja Kadi Pärnitsa seisukohtadest

  3. Sakslastelt tuumaenergiale selge "ei". Merkel on sunnitud tuumaplaane korrigeerima / Sirje Rank

    Index Scriptorium Estoniae

    Rank, Sirje, 1966-

    2011-01-01

    Ligi 60 aastat Daimleri ja Porsche liidumaal valitsenud kristlikud demokraadid said kohalikel valimistel Baden-Württembergis halvima valimisulemuse alates 1952. aastast ja arvatakse, et Saksamaa kantsler Angela Merkel ei käivitagi enamikku ajutiselt suletud vanemaid tuumareaktoreid

  4. NATO peasekretär : Londoni terror ei peata võitlust terrorismi vastu / Ahto Lobjakas

    Index Scriptorium Estoniae

    Lobjakas, Ahto, 1970-

    2005-01-01

    8. juunil Brüsselis toimunud erakorralisest istungist, kus avaldati toetust Suurbritanniale pärast Londoni terrorirünnakut, toimunu laadsed rünnakud ei suuda väärata NATO võitlust terrorismiga kogu maailmas. Lisa: G8 ei lasknud end terrorist kõigutada. Kommenteerivad USA president Georg W. Bush, Venemaa president Vladimir Putin, Austraalia peaminister John Howard, Pariisi linnapea Bertrand Delanoe ja ROK-i president Jacques Rogge

  5. Jack Deverell : NATO ei kao kuhugi / Jack Deverell ; interv. Margus Kolga

    Index Scriptorium Estoniae

    Deverell, Jack

    2005-01-01

    NATO põhjapiirkonna vägede endise juhi arvates võiks NATO olla endiselt peamine sõjalise jõu instrument, olgu tegemis siis NATO või EL-i juhitud sõjalise operatsiooniga, ta ei usu, et NATO ja EL muutuvad sõjaliselt ning poliitiliselt omavahel võistlevateks organisatsioonideks. Riigid peaksid tegutsema koos selliste sõjaliste võimete loomisel, milleks nad üksi suutelised ei ole

  6. Sulfonamide-Based Inhibitors of Aminoglycoside Acetyltransferase Eis Abolish Resistance to Kanamycin in Mycobacterium tuberculosis

    Energy Technology Data Exchange (ETDEWEB)

    Garzan, Atefeh; Willby, Melisa J.; Green, Keith D.; Gajadeera, Chathurada S.; Hou, Caixia; Tsodikov, Oleg V.; Posey, James E.; Garneau-Tsodikova, Sylvie

    2016-12-08

    A two-drug combination therapy where one drug targets an offending cell and the other targets a resistance mechanism to the first drug is a time-tested, yet underexploited approach to combat or prevent drug resistance. By high-throughput screening, we identified a sulfonamide scaffold that served as a pharmacophore to generate inhibitors of Mycobacterium tuberculosis acetyltransferase Eis, whose upregulation causes resistance to the aminoglycoside (AG) antibiotic kanamycin A (KAN) in Mycobacterium tuberculosis. Rational systematic derivatization of this scaffold to maximize Eis inhibition and abolish the Eis-mediated KAN resistance of M. tuberculosis yielded several highly potent agents. A crystal structure of Eis in complex with one of the most potent inhibitors revealed that the inhibitor bound Eis in the AG-binding pocket held by a conformationally malleable region of Eis (residues 28–37) bearing key hydrophobic residues. These Eis inhibitors are promising leads for preclinical development of innovative AG combination therapies against resistant TB.

  7. DOE's annealing prototype demonstration projects

    International Nuclear Information System (INIS)

    Warren, J.; Nakos, J.; Rochau, G.

    1997-01-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy's Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana's Marble Hill nuclear power plant. The MPR team's annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company's nuclear power plant at Midland, Michigan. This paper describes the Department's annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges

  8. DOE HPCOR - ARDRA Project Overview

    Energy Technology Data Exchange (ETDEWEB)

    Kunen, A J

    2015-09-02

    The problem addressed is Deterministic (Sn) Particle Transport (Neutrons and Gamma Rays) on structured grids. The Linear Boltzmann Transport Equation is discretized and solved using the Discrete Ordinates method. This work can be used for solving criticality, shielding and time-dependent problems. Primary numerical methods, calculation aspects, and software issues are sketched.

  9. Keegi ei võta meilt unistusi, kui me ise neid endalt ei võta / Toomas Hendrik Ilves

    Index Scriptorium Estoniae

    Ilves, Toomas Hendrik, 1953-

    2008-01-01

    Vabariigi Presidendi kõne Eesti Vabariigi väljakuulutamise 90. aastapäeval 24. veebruaril 2008 Estonia teatris. Ilmunud ka: Postimees : na russkom jazõke 25. veebr. 2008, lk. 9; Eesti Päevaleht 25. veebr. 2008, lk. 2, pealk.: Ilves: ärme ajame segamini iseseisvust ja vabadust (lüh.); SL Õhtuleht 25. veebr. 2008, lk. 11, pealk.: Eesti on tugevam kui varem (lüh.) SL Õhtulehes vt. ka juhtkiri: Otsene kõne. SL Õhtulehe arvates oli presidendi kõne lihtne ja selge jutt Eesti kodanikule, heale sõbrale. SL Õhtulehes vt. ka Andres Varustini karikatuur; Pärnu Postimees 26. veebr. 2008, lk. 21, pealk.: Vabariigi presidendi Toomas Hendrik Ilvese aastapäevakõne 24. veebruaril Estonia teatris (lüh.); Hiiu Leht 26. veebr. 2008, lk. 2, pealk.: EV 90. aastapäeva peokõne (lüh.); Järva Teataja 26. veebr. 2008, lk. 2, pealk.: Soovid tuleb täita kuldkalakese abita; Virumaa Teataja 26. veebr. 2008, lk. 4, pealk.: Riigi heaolu eest peab seisma iga kodanik (lüh.); Põhjarannik 26. veebr. 2008, lk. 4, pealk.: Keskendugem jäävale! (lüh.); Severnoje Poberežje 26. veebr. 2008, lk. 4; Sakala 26. veebr. 2008, k. 2, pealk.: Mõisa köis ei lohise enam, sest mõis on oma ja köis on oma (lüh.); Maaleht 28. veebr. 2008, lk. 17, pealk.: Miski pole võimatu, kuni pole tõestatud vastupidist (lüh.); Eesti Elu 29. veebr. 2008, lk. 2, 16, pealk.: Vabariigi President Eesti Vabariigi väljakuulutamise 90. aastapäeval 24. veebruaril 2008 Estonia teatris (lüh.); Vaba Eesti Sõna 28. veebr. 2008, lk. 3, 10, pealk.: Vabariigi Presidendi kõne Eesti Vabariigi väljakuulutamise 90. aastapäeva pidulikul kontsertaktusel 24. veebruaril 2008 Estonia teatris; Vaba Eesti Sõna 13. märts 2008, lk. 12, pealk.: "We have assumed respectable responsibility in the family of nations" (lüh.); Läänekaare Postipoiss 2008, nr. 212, lk. 8-11, pealk.: Vabariigi President Eesti Vabariigi väljakuulutamise 90. aastapäeva pidulikul kontsertaktusel 24. veebruaril 2008 Estonia teatris

  10. 77 FR 70414 - White River National Forest; Eagle County, CO; Vail Mountain Recreation Enhancements Projects EIS

    Science.gov (United States)

    2012-11-26

    ... engage in dispersed recreational activities (i.e., hiking, biking and camping); and (2) those who seek... Flyer Rappel Activity at Adventure Ridge Expanded Hiking and Mountain Bike Trails Riparian Experience at... harmonize with, and benefit from, the natural setting of the NFS lands within Vail's existing Forest Service...

  11. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Science.gov (United States)

    2012-05-03

    ..., Portland, Oregon 97208-3621; toll-free telephone 1-800-282-3713; direct telephone 360- 619-6178; or email... citizens, special interest groups, local and federal governments, and any other interested parties are...

  12. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D ampersand D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI)

  13. Project Narrative

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Mary C. [St. Bonaventure University, St Bonaventure, NY(United States)

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  14. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  15. Public Interaction and Educational Outreach on the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Benson, A.; Riding, Y.

    2002-01-01

    In July 2002, the U.S. Congress approved Yucca Mountain in Nevada as the nation's first long-term geologic repository site for spent nuclear fuel and high-level radioactive waste. This major milestone for the country's high-level radioactive waste disposal program comes after more than twenty years of scientific study and intense public interaction and outreach. This paper describes public interaction and outreach challenges faced by the U.S. Department of Energy's (DOE) Yucca Mountain Project in the past and what additional communication strategies may be instituted following the July 2002 approval by the U.S. Congress to develop the site as the nation's first long-term geologic repository for spent nuclear fuel and high-level radioactive waste. The DOE public involvement activities were driven by two federal regulations--the National Environmental Policy Act (NEPA) and the Nuclear Waste Policy Act (NWPA) of 1982, as amended. The NEPA required that DOE hold public hearings at key points in the development of an Environmental Impact Statement (EIS) and the NWPA required the agency to conduct public hearings in the vicinity of the site prior to making a recommendation regarding the site's suitability. The NWPA also provided a roadmap for how DOE would interact with affected units of government, which include the state of Nevada and the counties surrounding the site. Because the Department anticipated and later received much public interest in this high-profile project, the agency decided to go beyond regulatory-required public involvement activities and created a broad-based program that implemented far-reaching public interaction and outreach tactics. Over the last two decades, DOE informed, educated, and engaged a myriad of interested local, national, and international parties using various traditional and innovative approaches. The Yucca Mountain Project's intensive public affairs initiatives were instrumental in involving the public, which in turn resulted in

  16. Public Interaction and Educational Outreach on the Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    A. Benson; Y. Riding

    2002-11-14

    In July 2002, the U.S. Congress approved Yucca Mountain in Nevada as the nation's first long-term geologic repository site for spent nuclear fuel and high-level radioactive waste. This major milestone for the country's high-level radioactive waste disposal program comes after more than twenty years of scientific study and intense public interaction and outreach. This paper describes public interaction and outreach challenges faced by the U.S. Department of Energy's (DOE) Yucca Mountain Project in the past and what additional communication strategies may be instituted following the July 2002 approval by the U.S. Congress to develop the site as the nation's first long-term geologic repository for spent nuclear fuel and high-level radioactive waste. The DOE public involvement activities were driven by two federal regulations--the National Environmental Policy Act (NEPA) and the Nuclear Waste Policy Act (NWPA) of 1982, as amended. The NEPA required that DOE hold public hearings at key points in the development of an Environmental Impact Statement (EIS) and the NWPA required the agency to conduct public hearings in the vicinity of the site prior to making a recommendation regarding the site's suitability. The NWPA also provided a roadmap for how DOE would interact with affected units of government, which include the state of Nevada and the counties surrounding the site. Because the Department anticipated and later received much public interest in this high-profile project, the agency decided to go beyond regulatory-required public involvement activities and created a broad-based program that implemented far-reaching public interaction and outreach tactics. Over the last two decades, DOE informed, educated, and engaged a myriad of interested local, national, and international parties using various traditional and innovative approaches. The Yucca Mountain Project's intensive public affairs initiatives were instrumental in involving the public

  17. Final Project Report for DOE/EERE High-Capacity and Low-Cost Hydrogen-Storage Sorbents for Automotive Applications

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Hong-Cai [Texas A & M Univ., College Station, TX (United States); Liu, Di-Jia [Texas A & M Univ., College Station, TX (United States)

    2017-12-01

    This report provides a review of the objectives, progress, and milestones of the research conducted during this project on the topic of developing innovative metal-organic frameworks (MOFs) and porous organic polymers (POPs) for high-capacity and low-cost hydrogen-storage sorbents in automotive applications.1 The objectives of the proposed research were to develop new materials as next-generation hydrogen storage sorbents that meet or exceed DOE’s 2017 performance targets of gravimetric capacity of 0.055 kg H2/kgsystem and volumetric capacity of 0.040 kg H2/Lsystem at a cost of $400/kg H2 stored. Texas A&M University (TAMU) and Argonne National Laboratory (ANL) collaborated in developing low-cost and high-capacity hydrogen-storage sorbents with appropriate stability, sorption kinetics, and thermal conductivity. The research scope and methods developed to achieve the project’s goals include the following: Advanced ligand design and synthesis to construct MOF sorbents with optimal hydrogen storage capacities, low cost and high stability; Substantially improve the hydrogen uptake capacity and chemical stability of MOF-based sorbents by incorporating high valent metal ions during synthesis or through the post-synthetic metal metathesis oxidation approach; Enhance sorbent storage capacity through material engineering and characterization; Generate a better understanding of the H2-sorbent interaction through advanced characterization and simulation. Over the course of the project 5 different MOFs were developed and studied: PCN-250, PCN-12, PCN-12’, PCN-608 and PCN-609.2-3 Two different samples were submitted to the National Renewable Energy Laboratory (NREL) in order to validate their hydrogen adsorption capacity, PCN-250 and PCN-12. Neither of these samples reached the project’s Go/No-Go requirements but the data obtained did further prove the hypothesis that the presence of open metal

  18. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  19. UNDERFLIGHT CALIBRATION OF SOHO/CDS AND HINODE/EIS WITH EUNIS-07

    Energy Technology Data Exchange (ETDEWEB)

    Wang Tongjiang; Brosius, Jeffrey W. [Institute for Astrophysics and Computational Sciences (IACS) in the Department of Physics, Catholic University of America, 620 Michigan Avenue NE, Washington, DC 20064 (United States); Thomas, Roger J.; Rabin, Douglas M.; Davila, Joseph M. [NASA Goddard Space Flight Center, Code 671, Greenbelt, MD 20771 (United States); Young, Peter R. [College of Science, George Mason University, 4400 University Drive, Fairfax, VA 22030 (United States); Del Zanna, Giulio, E-mail: tongjiang.wang@nasa.gov [DAMTP, Centre for Mathematical Sciences, University of Cambridge, Wilberforce Road, Cambridge, CB3 0WA (United Kingdom)

    2011-12-01

    Flights of Goddard Space Flight Center's Extreme Ultraviolet Normal Incidence Spectrograph (EUNIS) sounding rocket in 2006 and 2007 provided updated radiometric calibrations for Solar and Heliospheric Observatory/Coronal Diagnostic Spectrometer (SOHO/CDS) and Hinode/Extreme Ultraviolet Imaging Spectrometer (Hinode/EIS). EUNIS carried two independent imaging spectrographs covering wavebands of 300-370 A in first order and 170-205 A in second order. After each flight, end-to-end radiometric calibrations of the rocket payload were carried out in the same facility used for pre-launch calibrations of CDS and EIS. During the 2007 flight, EUNIS, SOHO/CDS, and Hinode/EIS observed the same solar locations, allowing the EUNIS calibrations to be directly applied to both CDS and EIS. The measured CDS NIS 1 line intensities calibrated with the standard (version 4) responsivities with the standard long-term corrections are found to be too low by a factor of 1.5 due to the decrease in responsivity. The EIS calibration update is performed in two ways. One uses the direct calibration transfer of the calibrated EUNIS-07 short wavelength (SW) channel. The other uses the insensitive line pairs, in which one member was observed by the EUNIS-07 long wavelength (LW) channel and the other by EIS in either the LW or SW waveband. Measurements from both methods are in good agreement, and confirm (within the measurement uncertainties) the EIS responsivity measured directly before the instrument's launch. The measurements also suggest that the EIS responsivity decreased by a factor of about 1.2 after the first year of operation (although the size of the measurement uncertainties is comparable to this decrease). The shape of the EIS SW response curve obtained by EUNIS-07 is consistent with the one measured in laboratory prior to launch. The absolute value of the quiet-Sun He II 304 A intensity measured by EUNIS-07 is consistent with the radiance measured by CDS NIS in quiet regions

  20. Information management problems relating to numeric data base services for DOE. QEI report 9413 (Interim report for Phase II of QEI project 4191)

    International Nuclear Information System (INIS)

    Kuipers, J.W.; Thorpe, R.W.

    1979-01-01

    Problems of numeric data are examined as these relate to the question of possible steps toward implementation of an integrated national information system for DOE. It is proposed that DOE make policy and organization changes in order to centralize and upgrade information management as a particular responsibility for the oversight of DOE-wide information requirements. Eight points to be emphasized in such a program are set forth

  1. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  2. Determined of Rainfall Erosivity Indices (EI30, Lal, Hudson and Onchev for Namak Lake Basin

    Directory of Open Access Journals (Sweden)

    Z.T. Alipour

    2011-06-01

    Full Text Available In this research the indices EI30, AIm,‎ KE>1‎ as well as P/√t‎ were determined for 16 pluviograph as well as for 3 Namak Lake Basin nearby stations. Regression relationships were established between the dependent variables of EI30, AIm, KE>1‎ as well as P/√t‎ Indices and other easily accessible rainfall indices of: fournier, modified fournier, maximum monthly rainfall, maximum daily rainfall, standard deviation of monthly and annual rainfall as well as pluviometer site elevations. This made the establishment of appropriate relationships between rainfall intensity dependent indices and the dependent variable of rainfall intensity (at stations where intensity was non-existent possible. In the next step, the indices as well as easily accessible rainfall data from pluviograph stations were exploited to find out EI30 ,AIm ,‎ KE>1‎ as well as P/√t‎ indices, while using the previously obtained regression relationships.

  3. The Application of the EIS in Li-ion Batteries Measurement

    Science.gov (United States)

    Zhai, N. S.; Li, M. W.; Wang, W. L.; Zhang, D. L.; Xu, D. G.

    2006-10-01

    The measurement and determination of the lithium ion battery's electrochemical impedance spectroscopy (EIS) and the application of EIS to battery classification are researched in this paper. The lithium ion battery gets extensive applications due to its inherent advantages over other batteries. For proper and sustainable performance, it is very necessary to check the uniformity of the lithium ion batteries. In this paper, the equivalent circuit of the lithium ion battery is analyzed; the design of hardware circuit based on DSP and software that calculates the EIS of the lithium ion battery is critically done and evaluated. The parameters of the lithium ion equivalent circuit are determined, the parameter values of li-ion equivalent circuit are achieved by least square method, and the application of Principal Component Analysis (CPA) to the battery classification is analyzed.

  4. The Application of the EIS in Li-ion Batteries Measurement

    Energy Technology Data Exchange (ETDEWEB)

    Zhai, N S [Shenzhen Graduate School, Harbin Institute of Technology, Shenzhen (China); Li, M W [Shenzhen Graduate School, Harbin Institute of Technology, Shenzhen (China); Wang, W L [Shenzhen BPL instrument Ltd., Shenzhen (China); Zhang, D L [Shenzhen Graduate School, Harbin Institute of Technology, Shenzhen (China); Xu, D G [Electrical Engineering and Automation School, Harbin Institute of Technology, Harbin (China)

    2006-10-15

    The measurement and determination of the lithium ion battery's electrochemical impedance spectroscopy (EIS) and the application of EIS to battery classification are researched in this paper. The lithium ion battery gets extensive applications due to its inherent advantages over other batteries. For proper and sustainable performance, it is very necessary to check the uniformity of the lithium ion batteries. In this paper, the equivalent circuit of the lithium ion battery is analyzed; the design of hardware circuit based on DSP and software that calculates the EIS of the lithium ion battery is critically done and evaluated. The parameters of the lithium ion equivalent circuit are determined, the parameter values of li-ion equivalent circuit are achieved by least square method, and the application of Principal Component Analysis (CPA) to the battery classification is analyzed.

  5. Interface Design for CMOS-Integrated Electrochemical Impedance Spectroscopy (EIS Biosensors

    Directory of Open Access Journals (Sweden)

    Arjang Hassibi

    2012-10-01

    Full Text Available Electrochemical Impedance Spectroscopy (EIS is a powerful electrochemical technique to detect biomolecules. EIS has the potential of carrying out label-free and real-time detection, and in addition, can be easily implemented using electronic integrated circuits (ICs that are built through standard semiconductor fabrication processes. This paper focuses on the various design and optimization aspects of EIS ICs, particularly the bio-to-semiconductor interface design. We discuss, in detail, considerations such as the choice of the electrode surface in view of IC manufacturing, surface linkers, and development of optimal bio-molecular detection protocols. We also report experimental results, using both macro- and micro-electrodes to demonstrate the design trade-offs and ultimately validate our optimization procedures.

  6. Interface design for CMOS-integrated Electrochemical Impedance Spectroscopy (EIS) biosensors.

    Science.gov (United States)

    Manickam, Arun; Johnson, Christopher Andrew; Kavusi, Sam; Hassibi, Arjang

    2012-10-29

    Electrochemical Impedance Spectroscopy (EIS) is a powerful electrochemical technique to detect biomolecules. EIS has the potential of carrying out label-free and real-time detection, and in addition, can be easily implemented using electronic integrated circuits (ICs) that are built through standard semiconductor fabrication processes. This paper focuses on the various design and optimization aspects of EIS ICs, particularly the bio-to-semiconductor interface design. We discuss, in detail, considerations such as the choice of the electrode surface in view of IC manufacturing, surface linkers, and development of optimal bio-molecular detection protocols. We also report experimental results, using both macro- and micro-electrodes to demonstrate the design trade-offs and ultimately validate our optimization procedures.

  7. The Application of the EIS in Li-ion Batteries Measurement

    International Nuclear Information System (INIS)

    Zhai, N S; Li, M W; Wang, W L; Zhang, D L; Xu, D G

    2006-01-01

    The measurement and determination of the lithium ion battery's electrochemical impedance spectroscopy (EIS) and the application of EIS to battery classification are researched in this paper. The lithium ion battery gets extensive applications due to its inherent advantages over other batteries. For proper and sustainable performance, it is very necessary to check the uniformity of the lithium ion batteries. In this paper, the equivalent circuit of the lithium ion battery is analyzed; the design of hardware circuit based on DSP and software that calculates the EIS of the lithium ion battery is critically done and evaluated. The parameters of the lithium ion equivalent circuit are determined, the parameter values of li-ion equivalent circuit are achieved by least square method, and the application of Principal Component Analysis (CPA) to the battery classification is analyzed

  8. 75 FR 26739 - Notice of Intent To Prepare an Environmental Impact Statement (EIS) for Airfield Operations at...

    Science.gov (United States)

    2010-05-12

    ..., Naval Facilities Engineering Command Southeast, 904-542-6866. SUPPLEMENTARY INFORMATION: The Navy's... period (ending June 10, 2010) will receive the same attention and consideration during EIS preparation...

  9. THE IMPROVEMENT AND APPLICATION OF EI-GUN (ELECTRICAL INSEMINATION GUN FOR ARTIFICIAL INSEMINATION (AI USING GOAT FRESH SEMEN

    Directory of Open Access Journals (Sweden)

    Mirsa Ita Dewi

    2017-03-01

    Full Text Available Electrical Insemination Gun (EI-GUN was a tool for Artificial Insemination (AI using fresh semen with an electric control system. The research objective was to produced EI-GUN for AI using fresh semen on small ruminants (goat. The research was conducted from March to June 2015. The process of EI-GUN creation implemented in Design and Prototype Laboratory and Aero Modeling Research Laboratory at Engineering Faculty, University of Brawijaya (UB. Testing tools EI-GUN on goat was conducted in the Sumber Sekar Laboratory, Animal Husbandry Faculty, UB.  The methods of research were literature study, tool specification determination, designing EI-GUN, running test, semen evaluation passed EI-GUN and application on Goat. EI-GUN has seven important parts, which supports each other in this operating system. Those parts consist of stylet, servo, system controlled, insemination pump, connecting rod, battery, and holder. EI-GUN work system sucked the semen into insemination pump as much as 5 ml, and release the semen 0.25 ml appropriate standard of AI. It was applicable for 20 times AI. The results showed that the cell motility of spermatozoa ≥ 70% were still in ranging of Indonesian National Standard (SNI.   Keywords: artificial insemination, EI-GUN, fresh semen.

  10. Determined of Rainfall Erosivity Indices (EI30, Lal, Hudson and Onchev) for Namak Lake Basin

    OpenAIRE

    Z.T. Alipour; M.H. Mahdian; S. Hakimkhani; M. Saeedi

    2011-01-01

    In this research the indices EI30, AIm,‎ KE>1‎ as well as P/√t‎ were determined for 16 pluviograph as well as for 3 Namak Lake Basin nearby stations. Regression relationships were established between the dependent variables of EI30, AIm, KE>1‎ as well as P/√t‎ Indices and other easily accessible rainfall indices of: fournier, modified fournier, maximum monthly rainfall, maximum daily rainfall, standard deviation of monthly and annual rainfall as well as pluviometer site elevations. This made ...

  11. Design and analysis of EI core structured transverse flux linear reluctance actuator

    OpenAIRE

    FENERCİOĞLU, AHMET; AVŞAR, YUSUF

    2015-01-01

    In this study, an EI core linear actuator is proposed for horizontal movement systems. It is a transverse flux linear switched reluctance motor designed with an EI core structure geometrically. The actuator is configured into three phases and at a 6/4 pole ratio, and it has a stationary active stator along with a sliding passive translator. The stator consists of E cores and the translator consists of I cores. The actuator has a yokeless design because the stator and translator have no back i...

  12. Tony Blair ei saanud Balti riikidelt loodetud järeleandmisi / Andris Feldmanis

    Index Scriptorium Estoniae

    Feldmanis, Andris, 1982-

    2005-01-01

    Balti riigid ei olnud nõus loobuma kümnendikust eurotoetustest. Tallinnas viibinud Suurbritannia peaministri Tony Blairi väitel on EL-i uue finantsperspektiivi vastuvõtmine just uute liikmesriikide huvides. Vt. samas: Tiiu Laks. Riigijuhi visiit põhjustas Tallinnas vaid lühiajalisi liiklusseisakuid; Lisa: Blairi esinemine ei reetnud ebaedu; Kaivo Kopli. Uusliikmed andsid tuld juba enne ettepanekute saamist; Lisa: Toetus vanadelt liikmesmaadelt; Märt Kivine. EL-i eelarve: lahjem kui kunagi varem. Kommenteerib Taavi Veskimägi

  13. Does working with industry come at a price? : a study of doctoral candidates' performance in collaborative vs. non-collaborative PhD projects

    NARCIS (Netherlands)

    Salimi, N.; Bekkers, R.N.A.; Frenken, K.

    2014-01-01

    The increasing involvement of industry in academic research raised concerns whether university-industry projects actually meet the same academic standards as university projects in-house. Looking at the academic output and impact of collaborative versus non-collaborative Ph.D. projects at Eindhoven

  14. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, P.O. Box 1600, MSIN R4-41, 99352 (United States)

    2013-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  15. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    2013-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  16. CALIFICAREA JURIDICO-PENALĂ A VIOLENŢEI SEXUALE ASUPRA FEMEILOR CA FORMĂ DISTINCTĂ A VIOLENŢEI ÎN FAMILIE

    Directory of Open Access Journals (Sweden)

    Nicolae CORCEA

    2016-03-01

    Full Text Available Scopul acestui mesaj ştiinţific constă în rezolvarea controverselor doctrinare în domeniul calificării infracţiunii de violenţă în familie în una din formele ei speciale, cum ar fi violenţa sexuală. Cu toate că violenţa sexuală nu este prevă­zută expres de către legiuitor ca o formă distinctă a violenţei în familie, aceasta devine un fenomen extrem de răspândit. Autorul analizează violenţa împotriva femeilor bazată pe gen, arată caracterul discriminator al violenţei în familie îm­pot­riva femeilor în societăţile contemporane; examinează conceptul şi formele violenţei sexuale; demonstrează că violenţa sexuală în familie constituie o formă specială de subminare a femeilor şi a copiilor; propune calificarea juridico-penală a violenţei sexuale în familie.Qualification in criminal law of the sexual violence against women as a distinct form of the family violenceThe purpose of this scientific research consists in the solving of doctrinaire controversies in the sphere of legal appreciation of the criminal offence of family violence in one of its special forms as sexual violence. Even if sexual violence is not provided expressly in the penal legal norm as the independent form of family violence, this one became extremely spread. The author submits to a profound analysis the gender violence against women and demonstrates the discriminatory character of the family violence against women in the modern society; examines the concept and forms of sexual violence; proves that sexual violence in the family constitutes a special form of the women and children sup­pression; recommends legal appreciation of the criminal offence of the sexual violence in family. 

  17. Does the Gold Standard label hold its promise in delivering higher Sustainable Development benefits? A multi-criteria comparison of CDM projects

    International Nuclear Information System (INIS)

    Drupp, Moritz A.

    2011-01-01

    The Clean Development Mechanism (CDM) has a twin objective: to help developed countries reduce GHG emissions, and to support developing countries in achieving Sustainable Development (SD). As a response to the widespread criticism of the CDM's unsatisfactory SD record, initiatives have developed premium labels like the Gold Standard, which applies two additional 'screens' to filter CDM projects for higher SD benefits. In order to determine whether Gold Standard projects can be associated with higher local SD benefits, this paper evaluates the potential benefits of 48 CDM projects using a multi-criteria method and building on existing work. The 18 evaluated Gold Standard projects are compared to a 'representative portfolio' of 30 unlabeled CDM projects in order to capture the 'full' effect of the additional Gold Standard requirements, which is further decomposed into the two 'screen' effects. The results suggest that Gold Standard Certified Emission Reductions can be associated with higher potential local SD benefits when compared to the 'representative portfolio' of unlabeled CDM projects, while the comparison of projects of the same type remains inconclusive. The results support previous findings showing that renewable energy projects may deliver comparatively high SD benefits. - Research highlights: → This study evaluates and compares the potential contribution of unlabeled- and Gold Standard labeled CDM projects to Sustainable Development (SD), extending the previously assessed projects as well as the methodological approach. → Gold Standard labeled Certified Emission Reductions (CER) can be associated with higher potential SD benefits compared to unlabeled projects. → A decomposition analysis shows that the Gold Standard s SD surplus must be primarily attributed to the favorable contribution of renewable energy projects to SD. → Policy makers might thus shift incentives towards renewable energy projects and buyers of CERs may shift their offset

  18. The Iterative Use of Single Case Research Designs to Advance the Science of EI/ECSE

    Science.gov (United States)

    Barton, Erin E.; Ledford, Jennifer R.; Lane, Justin D.; Decker, Jessica; Germansky, Sara E.; Hemmeter, Mary Louise; Kaiser, Ann

    2016-01-01

    Research in early intervention/early childhood special education (EI/ECSE) is focused on identifying effective practices related to positive outcomes for young children with disabilities and their families. Individual responses to evidence-based practices are often variable, and non-responders are common. Single case research (SCR) might be…

  19. Loeb või ei loe : IT on olulisem kui eales varem / James Champy

    Index Scriptorium Estoniae

    Champy, James

    2004-01-01

    Vastukajad ajakirja Think! 2003. aasta 2. numbris avaldatud Nicholas Carr'i artiklile "IT ei loe". Autori sõnul näitab kogemus, et infotehnoloogia (IT) on oluline, kui seda kasutatakse innovaatiliste lahenduste loomiseks ja ettevõtte konkurentsivõime muutmiseks

  20. HIV-positiivsed ei leia tihti tööd / Kadri Ibrus

    Index Scriptorium Estoniae

    Ibrus, Kadri

    2010-01-01

    Enamik Eesti HIV-positiivseid inimesi ei tööta. Eestit nõustanud USA eksperdi David Parkeri väitel tuleks HIV-positiivset aidata sotsiaalselt paremini hakkama saama, tegelema peaks korraga kõigi tema probleemidega

  1. Eesti koolid ei jaksa enam Microsoftilt tarkvara osta / Teele Tammeorg ; kommenteerinud Rain Laane

    Index Scriptorium Estoniae

    Tammeorg, Teele

    2013-01-01

    Eesti koolide arvutid on nii vananenud, et ei saa kasutada uuemaid operatsioonisüsteeme, Windowsi operatsioonisüsteem ja MS Office'i kasutamine aga kallineb vähemalt kümme korda. Arvamust avaldab ka Tallinna ülikooli haridustehnoloogia keskuse juht Mart Laanpere

  2. Iraagi päästmiseks poliitikast ei piisa / Henry A. Kissinger

    Index Scriptorium Estoniae

    Kissinger, Henry, 1923-

    2007-01-01

    Endine USA riigisekretär arutleb Iraagi-poliitika üle. Autor nendib, et äkiline USA vägede väljaviimine Iraagist ei lõpetaks sõda, vaid muudaks ainult selle olusid, parim strateegia Iraagi kriisi ületamiseks on rahvusvahelise diplomaatia kasutamine. Lisa: USA väed Iraagis

  3. Rein Porro : ma ei kavatse lennuametist lahkuda / Rein Porro ; interv. Mirko Ojakivi

    Index Scriptorium Estoniae

    Porro, Rein, 1943-

    2006-01-01

    Lennuameti peadirektori asetäitja vastab küsimustele, kas ta rikkus lennundusseadust, väljastades lennuloa ettevõttele Pakker Avio, kas ta on läinud tülli lennuõnnetustega tuntuks saanud lennufirmaga ning seepärast püütakse temast vabaneda. Lisa: Uurimine rikkumisi ei tuvastanud

  4. Poliitikud ei leidnud staadioni planeeringule uusi lahendusi / Eno-Gerrit Link

    Index Scriptorium Estoniae

    Link, Eno-Gerrit

    2008-01-01

    Riigikogu Pärnumaa saadikuteühenduse ja Pärnu linnavõimu esindajate ning spordiseltsi Kalev juhtide nõupidamine Kalevi staadioni ümberehituse käimalükkamiseks lõppes tulemusteta, sest kõiki osapooli rahuldava tulemuseni ei jõutud. Kommenteerivad Mark Soosaar ja Vello Järvesalu

  5. 75 FR 76444 - Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey...

    Science.gov (United States)

    2010-12-08

    ... potential environmental impacts associated with construction and operation of the proposed Panoramic Survey... DEPARTMENT OF DEFENSE Department of the Air Force Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey Telescope and Rapid Response System (Pan-STARRS) at the Summit...

  6. EMT ja Elioni katkestusi ei põhjustanud sama seade / Urmas Jaagant

    Index Scriptorium Estoniae

    Jaagant, Urmas

    2010-01-01

    EMT esindaja väitel ei olnud rikki läinud seade sama, mis tõi kaasa Elioni sidekatkestuse. 1. detsembril toimunud EMT sidekatkestuse põhjus selgub nädala lõpuks, katkestuse kompensatsiooniks on 3. detsembril EMT klientidele võrgusisesed kõned tasuta

  7. Eesti ei maksa Natura aladel toetust 7800 krooni hektari kohta / Ain Lember

    Index Scriptorium Estoniae

    Lember, Ain

    2004-01-01

    EL 2007-2013 eelarve eelnõu kohaselt võib Natura 2000 aladel tegutsevatele põllumajandustootjatele maksta põllumajanduskõlviku hektari kohta igal aastal kuni 7800 krooni. Põllumajandusministeeriumi spetsialistid ei pea nii suurte toetuste maksmist võimalikuks

  8. Naftahinna olulist langust lähiajal loota ei maksa / Erik Aru

    Index Scriptorium Estoniae

    Aru, Erik

    2008-01-01

    Analüütikute hinnangul kujuneb tänavu nafta keskmiseks hinnaks 83,87 krooni barrelilt. Energiaanalüütik Julian Lee on seisukohal, et keskpikas perspektiivis peaks naftapuhastustehaste mahu kasv sundima naftahinna langema, Deutsche Banki tooraineanalüüsi juhi Michael Lewise arvates ei saa praegu suuremat hinnalangust tulla. Lisa: OPEC viivitab toodangukärpega. Diagramm

  9. Ekspert : Eestis ei vajata linnugripi tõrjeks välisabi / Nataly Koppel

    Index Scriptorium Estoniae

    Koppel, Nataly

    2005-01-01

    Eesti veterinaar- ja toiduameti arvates saab Eesti haiguse tõkestamisel hakkama omal jõul, sest seadus lubab operatsioonidesse kaasata nii päästeametite töötajaid kui sõjaväelasi, mistõttu välisabi ei vajata. Lisa: Linnugripi tüvi H5N1

  10. 36 CFR 1010.8 - Actions that normally require an EIS.

    Science.gov (United States)

    2010-07-01

    ... impact on the environment, an EA is not required, and the Trust will prepare or direct the preparation of... or actions may significantly affect the environment and therefore require an EIS are described in 40...(b)(9); (2) Approval, funding, construction, and/or demolition in preparation for construction of any...

  11. 7 CFR 1955.136 - Environmental Assessment (EA) and Environmental Impact Statement (EIS).

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Environmental Assessment (EA) and Environmental Impact... Disposal of Inventory Property General § 1955.136 Environmental Assessment (EA) and Environmental Impact Statement (EIS). (a) Prior to a final decision on some disposal actions, an environmental assessment must be...

  12. Miks IMF ei kiirusta riike rahanduskriisist päästma? / Heiki Suurkask

    Index Scriptorium Estoniae

    Suurkask, Heiki, 1972-

    2008-01-01

    Mitu riiki taotleb IMF-ilt kriisiabi, IMF esitab neile abi andmiseks rangeid nõudeid. Varasemates kriisides on IMF-i rahast piisanud, kuid suuremaid tööstusriike ta välja aidata ei suudaks, selle juhi Dominique Strauss-Kahni prognoosi kohaselt peab IMF seekord välja andma sadu miljardeid dollareid. Lisa: Pangajuhti tabas seksiskandaal

  13. 75 FR 3746 - Ryan White HIV/AIDS Part C Early Intervention Services (EIS) Program

    Science.gov (United States)

    2010-01-22

    ... HIV/AIDS Part C Early Intervention Services (EIS) Program AGENCY: Health Resources and Services...: Critical funding for HIV/AIDS care and treatment to the target populations in Orange County, Orlando..., 2010). The Orange County Health Department is known Statewide as an exceptional site for HIV/AIDS care...

  14. Euroopa Liidus firmasid kahmav Gazprom teisi Venemaa turule ei lase / Krister Paris

    Index Scriptorium Estoniae

    Paris, Krister, 1977-

    2006-01-01

    EL tahab, et Venemaa ratifitseeriks energiaharta, mis võimaldaks Euroopa kompaniidel hakata ise Venemaa gaasi eksportima, Venemaa aga välismaist konkurentsi ei soovi. Samas on Gazprom huvitatud Suurbritannia suurima gaasivarustaja Centrica ostust ning tahab sisenenda ise gaasi tootva Hollandi turule. Lisa: Venemaa teine energiahoob: riiklik Rosneft. Vt. samas: Gaasitoodangu kasvatamine pole veel Gazpromi huvides

  15. Baltic Scandinavian Lines - Tallinki konkurent, kes end konkurendiks ei nimeta / Margo Heinla ; interv. Mart Riikoja

    Index Scriptorium Estoniae

    Heinla, Margo

    2005-01-01

    BSL-i tegevjuht kinnitab, et Tallink ei ole nende jaoks konkurent, kuna tegevusalad on nii erinevad. BSL-i ainus laev Via Mare on orienteeritud kaubavedudele Paldiskist Lõuna-Rootsi Västerviki ja Kapellskäri. Vaba ruumi korral veetakse üle ka sõiduautosid

  16. Aktinäitust 'Kalamees Hemingway' Pärnus ei näe / Grete Naaber

    Index Scriptorium Estoniae

    Naaber, Grete, 1942-

    1999-01-01

    Mark Soosaare poolt lubatud Hemingwayd kujutavat 20 maalist (autor hollandlane Peter Diem) ja 40 fotost (aastaist 1928-1936, autor Waldo Peirce) koosnevat aktinäitust 'Kalamees Hemingway' ei õnnestu Pärnusse tuua, kuna see läheks Uue kunsti muuseumile maksma 100 000 krooni.

  17. 78 FR 29124 - Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water, and Solid...

    Science.gov (United States)

    2013-05-17

    ... public comment period. Copies of the Draft EIS are available at the following libraries: Alamogordo Public Library, El Paso Main Library, Irving Schwartz Branch Library, New Mexico State University Zuhl Library, Richard Burges Branch Library, Thomas Branigan Memorial Library, and University of Texas at El...

  18. Pakistan vajab abi - kas maailma tõesti ei huvita? / Urmas Jaagant

    Index Scriptorium Estoniae

    Suurkask, Heiki, 1972-

    2010-01-01

    Pakistan saab igal aastal suurt rahvusvahelist abi. Mitmed riigid on üleujutustes Pakistani toetanud nüüdki kümnete miljonite dollaritega, kuid riikide tahe annetada on erinev, sest mitte iga abidollarit ei suunata Pakistanis sinna, kus seda tegelikult vajatakse

  19. Ei lita bok biter seg fast. Wanny Woldstads fangstmannsberetning

    Directory of Open Access Journals (Sweden)

    Marit Anne Hauan

    2014-07-01

    Full Text Available A little book bites stuck. A trapper biography of Wanny Woldstad.Wanny Woldstad, who still is a well-known polar hero and made more and more famous the last decades through theater plays, songs and writings, wintered over at Svalbard as a trapper and hunter from 1932-37. She left her job as a taxi driver in Tromsø for a tiny little hut and a hunter’s life in Hornsund together with a man she just met. Nearly 20 years after returning to the civilization she wrote a book about her polar experience. Wintering as trappers and hunters seems to have also in a literary project and a lot of trappers have told them polar stories between book covers.Woldstad writes mainly about her first wintering. She is able to share that she in this first year was overwhelmed by her new surroundings; she was thrilled by the opportunity to hunt birds, foxes and polar bears. She describes enthusiastically nature and the hunting situations. Even everyday activities as making food, celebrating Christmas and writing diary are topics. In her book she gives credit to her partner as a teacher and mentor in the field of hunting and trapping. But through her writing she brings her own competence and capabilities in focus.  Her book gives a profound knowledge of a year in on hunting station on Svalbard. It is written as a true story – an autobiography although retrospective, but has its elements of fiction.

  20. National radioactive waste repository draft EIS. 2 volumes

    International Nuclear Information System (INIS)

    2002-01-01

    -north South Australia, approximately 400 km north of Adelaide, between the townships of Woomera and Roxby Downs. The sites are located in stony desert country with sparse saltbush. The extensive site selection process described in the report identified the preferred and alternative sites. A national repository represents the safest and most effective option for Australia to manage this type of waste, particularly as the ongoing generation of waste is expected to be relatively small, and therefore technically and economically does not justify the establishment of separate facilities on a stateby- state basis

  1. 75 FR 51448 - Withdrawal of Notice for Preparation of an Environmental Impact Statement (EIS) for the Arkansas...

    Science.gov (United States)

    2010-08-20

    ... sustainable solutions for reducing head-cutting and scouring in the Ark-White Cutoff area. The two rivers are... Preparation of an Environmental Impact Statement (EIS) for the Arkansas White River Cutoff Study AGENCY... Impact Statement (EIS) for the Arkansas White River Cutoff Study. The original Notice of Intent (NOI) was...

  2. Multi-Criteria Decision Analysis Framework in the Selection of an Enterprise Integration (EI) Approach That Best Satisfies Organizational Requirements

    Science.gov (United States)

    Ngeru, James

    2012-01-01

    In the past few decades, adoption of Enterprise Integration (EI) through initiatives such as Service Oriented Architecture (SOA), Enterprise Application Integration (EAI) and Enterprise Resource Planning (ERP) has consistently dominated most of organizations' top strategic priorities. Additionally, the field of EI has generated a vast amount…

  3. 75 FR 16828 - Notice of Intent To Prepare and Scope an Environmental Impact Statement (EIS) for the Outer...

    Science.gov (United States)

    2010-04-02

    ... impacts to tourism and recreation activities, and ecological impacts from potential degradation of marine... Environmental Impact Statement (EIS) for the Outer Continental Shelf (OCS) Oil and Gas Leasing Program for 2012.... The EIS will analyze the potential impacts of the adoption of the proposed 5-year program. Background...

  4. Moskvas hoitav Adolf Hitleri kolbatükk ei kuulu füürerile / Aadu Hiietamm

    Index Scriptorium Estoniae

    Hiietamm, Aadu, 1954-

    2009-01-01

    USA arheoloogi Nick Bellantoni avastus, et Moskvas hoitav Adolf Hitleri kuuliauguga koljutükk ei kuulugi füürerile, annab tõenäoliselt uut hoogu vandenõuteoreetikutele, kes usuvad, et Hitler ei teinud 1945. aastal enesetappu, vaid põgenes välismaale

  5. 78 FR 18325 - Intent To Prepare an Environmental Impact Statement (EIS) for the Formal Training Unit (FTU) and...

    Science.gov (United States)

    2013-03-26

    ... Statement (EIS) for the Formal Training Unit (FTU) and Main Operating Base 1 (MOB 1) for the Beddown of KC... Statement (EIS) for the Formal Training Unit (FTU) and Main Operating Base 1 (MOB 1) for the Beddown of KC...-46A tanker aircraft, associated infrastructure and manpower of the FTU and MOB 1 at existing active...

  6. Army Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved

    Science.gov (United States)

    2012-03-01

    exceeding $45 million EIS Cost of peer review contract Western C-111 Spreader Canal Project Implementation Report Jacksonville South...Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.

  7. Bibliography of documents and related materials collected for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, F.M.; Boston, C.R.; Burns, J.C.; Hagan, C.W. Jr.; Saulsbury, J.W.; Wolfe, A.K.

    1995-03-01

    This report has been prepared to make available and archive information developed during preparation of the Environmental Impact Statement for Phases 3 and 4 of the Hawaii Geothermal Project as defined by the state of Hawaii in its April 1989 proposal to Congress. On May 17, 1994, the USDOE published a notice in the Federal Register withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report provides a bibliography of documents, published papers, and other reference materials that were obtained or used. The report provides citations for approximately 642 documents, published papers, and other reference materials that were gathered to describe the potentially affected environment on the islands of Hawaii, Maui, and Oahu. The listing also does not include all the reference materials developed by support subcontractors and cooperating agencies who participated in the project. This listing does not include correspondence or other types of personal communications. The documents listed in this report can be obtained from original sources or libraries.

  8. The EIS beamline at the seeded free-electron laser FERMI

    Science.gov (United States)

    Simoncig, A.; Mincigrucci, R.; Principi, E.; Bencivenga, F.; Calvi, A.; Foglia, L.; Kurdi, G.; Raimondi, L.; Manfredda, M.; Mahne, N.; Gobessi, R.; Gerusina, S.; Fava, C.; Zangrando, M.; Matruglio, A.; Dal Zilio, S.; Masciotti, V.; Masciovecchio, C.

    2017-05-01

    Among the fourth-generation light sources, the Italian free-electron laser (FEL) FERMI is the only one operating in the high-gain harmonic generation (HGHG) seeding mode. FERMI delivers pulses characterized by a quasi transform limited temporal structure, photon energies lying in the extreme ultra-violet (EUV) region, supreme transversal and longitudinal coherences, high peak brilliance, and full control of the polarization. Such state of the art performances recently opened the doors to a new class of time-resolved spectroscopies, difficult or even impossible to be performed using self-amplified spontaneous sources (SASE) light sources. FERMI is currently equipped with three operating beamlines opened to external users (DiProI, LDM and EIS), while two more are under commissioning (MagneDYN and TeraFERMI). Here, we present the recent highlights of the EIS (Elastic and Inelastic Scattering) beamline, which has been purposely designed to take full advantage from the coherence, the intensity, the harmonics content, and the temporal duration of the pulses. EIS is a flexible experimental facility for time-resolved EUV scattering experiments on condensed matter systems, consisting of two independent end-stations. The first one (EIS-TIMEX) aims to study materials in metastable and warm dense matter (WDM) conditions, while the second end-station (EIS-TIMER) is fully oriented to the extension of four-wave mixing (FWM) spectroscopies towards the EUV spectral regions, trying to reveal the behavior of matter in portions of the mesoscopic regime of exchanged momentum impossible to be probed using conventional light sources.

  9. Robust Synchronization in an E/I Network with Medium Synaptic Delay and High Level of Heterogeneity

    International Nuclear Information System (INIS)

    Han Fang; Wang Zhi-Jie; Gong Tao; Fan Hong

    2015-01-01

    It is known that both excitatory and inhibitory neuronal networks can achieve robust synchronization only under certain conditions, such as long synaptic delay or low level of heterogeneity. In this work, robust synchronization can be found in an excitatory/inhibitory (E/I) neuronal network with medium synaptic delay and high level of heterogeneity, which often occurs in real neuronal networks. Two effects of post-synaptic potentials (PSP) to network synchronization are presented, and the synaptic contribution of excitatory and inhibitory neurons to robust synchronization in this E/I network is investigated. It is found that both excitatory and inhibitory neurons may contribute to robust synchronization in E/I networks, especially the excitatory PSP has a more positive effect on synchronization in E/I networks than that in excitatory networks. This may explain the strong robustness of synchronization in E/I neuronal networks. (paper)

  10. Does working with industry come at a price? A study of doctoral candidates’ performance in collaborative vs. non-collaborative Ph.D. projects

    NARCIS (Netherlands)

    Salimi, Negin; Bekkers, Rudi; Frenken, Koen

    2015-01-01

    Collaborative Ph.D. projects between university and industry constitute an important aspect of university–industry collaboration, yet has remained under-researched thus far. The specific question this paper asks is how collaborative Ph.D. projects perform compared to non-collaborative Ph.D.

  11. Vermont's involvement with the DOE's high-level radioactive waste disposal crystalline repository project. Final technical report, January 1-September 30, 1986

    International Nuclear Information System (INIS)

    1986-09-01

    The US Department of Energy (DOE) is charged with siting a second repository for the disposal of highly radioactive nuclear wastes. Because of this siting process, the DOE has looked to localities in 17 states in the eastern US for possible sites in crystalline rock. During the beginning of the progress report period, crystalline rocks in Vermont were under consideration as sites for further study. Vermont, through the Vermont State Geologist's Office, was closely involved with the DOE program during this period. Our main function has been to review DOE reports; attend DOE workshops and meetings; and inform the Vermont public, with the help of the DOE, about the high-level nuclear waste repository siting process. Nine sites in Vermont were under consideration during the Regional Characterization Phase until January 16, 1986. Because of this fact, there was considerable public interest in this program. Upon release of the Draft Area Recommendation Report, Vermont crystalline rock bodies were dropped from consideration. A site in New Hampshire and two sites in Maine remained on the list. Because of the draft status of the report and the possibility that a site 20 miles from the Vermont border in New Hampshire could remain as a selected site, Vermont has stayed active and interested. Two briefings and hearings were held in the State during the comment period January 16 through April 16, 1986. A thorough review of the Draft Area Recommendation Report was completed using reviewers from our Office, State agencies, outside experts, and citizen groups. With the announcement on May 28, 1986 of the suspension of the second repository siting process in crystalline rocks, our Office has worked toward closing out our active involvement

  12. 3D CAD ON Qinshan CANDU project

    International Nuclear Information System (INIS)

    Goland, D.

    2000-01-01

    This paper briefly describe AECL's work in applying computer-aided engineering tools to the Qinshan CANDU project. The main thrust of this paper is to introduce the major CAD software tools and their use in civil design, process design and EI and C design. Other special software tools and non-CAD tools and their applications are also briefly introduced. (author)

  13. How to Meet the Last OIE Expert Surveillance Panel Recommendations on Equine Influenza (EI Vaccine Composition: A Review of the Process Required for the Recombinant Canarypox-Based EI Vaccine

    Directory of Open Access Journals (Sweden)

    Romain Paillot

    2016-11-01

    Full Text Available Vaccination is highly effective to prevent, control, and limit the impact of equine influenza (EI, a major respiratory disease of horses. However, EI vaccines should contain relevant equine influenza virus (EIV strains for optimal protection. The OIE expert surveillance panel annually reviews EIV evolution and, since 2010, the use of Florida clade 1 and 2 sub-lineages representative vaccine strains is recommended. This report summarises the development process of a fully- updated recombinant canarypox-based EI vaccine in order to meet the last OIE recommendations, including the vaccine mode of action, production steps and schedule. The EI vaccine ProteqFlu contains 2 recombinant canarypox viruses expressing the haemagglutinin of the A/equine/Ohio/03 and A/equine/Richmond/1/07 isolates (Florida clade 1 and 2 sub-lineages, respectively. The updated EI vaccine was tested for efficacy against the representative Florida clade 2 EIV strain A/equine/Richmond/1/07 in the Welsh mountain pony model. Protective antibody response, clinical signs of disease and virus shedding were compared with unvaccinated control ponies. Significant protection was measured in vaccinated ponies, which supports the vaccine registration. The recombinant canarypox-based EI vaccine was the first fully updated EI vaccine available in the EU, which will help to minimise the increasing risk of vaccine breakdown due to constant EIV evolution through antigenic drift.

  14. How Does Transformational Leadership Promote Innovation in Construction? The Mediating Role of Innovation Climate and the Multilevel Moderation Role of Project Requirements

    Directory of Open Access Journals (Sweden)

    Yanchun Zhang

    2018-05-01

    Full Text Available Innovation plays a critical role in the sustainable development of the construction industry. This research aims at examining transformational leadership’s role in shaping employees’ innovative behavior by analyzing the mediating effect of innovation climate and the cross-level moderating effect of innovativeness as a project requirement. To achieve this aim, a questionnaire survey was conducted with 300 construction industry professionals in China and 251 valid replies were received. Data collected by the questionnaire were analyzed using the method of hierarchical linear modeling (HLM. The results showed that transformational leaders could nurture a mutual climate for innovation to motivate employees’ innovative behaviors. In addition, innovativeness as a project requirement at the project level strengthens the indirect link amongst transformational leadership and innovative behavior via the innovation climate. Therefore, in the presence of higher innovativeness as a project requirement, transformational leadership is more prone to exert a positive influence upon an individual’s innovative behavior via the perceived innovation climate. The research findings improve understanding of the roles of leadership and innovation climate in affecting individual behavioral outcomes, and could help project managers and leaders encourage innovative ideas within project organizations.

  15. Extensive EIS characterization of commercially available lithium polymer battery cell for performance modelling

    DEFF Research Database (Denmark)

    Stanciu, Tiberiu; Stroe, Daniel Loan; Teodorescu, Remus

    2015-01-01

    or degradation of an electrochemical system. Used for Lithium-ion (Li-ion) batteries, this method allows for a fast and accurate assessment of the battery's impedance at any working point, without modifying the state of the battery. The influence of the operating conditions, state of charge (SOC) and temperature...... on the performance of a commercially available 53 Ah Lithium polymer battery cell, manufactured by Kokam Co. Ltd., is investigated in laboratory experiments, at its beginning of life, by means of EIS. A data fitting algorithm was used to obtain the parameter values for the proposed equivalent electrical circuit......, which was further selected for the development of an accurate EIS based performance model for the chosen Li-ion battery cell....

  16. Magnesium and its alloys as degradable biomaterials: corrosion studies using potentiodynamic and EIS electrochemical techniques

    Directory of Open Access Journals (Sweden)

    Wolf Dieter Müller

    2007-03-01

    Full Text Available Magnesium is potentially useful for orthopaedic and cardiovascular applications. However, the corrosion rate of this metal is so high that its degradation occurs before the end of the healing process. In industrial media the behaviour of several magnesium alloys have been probed to be better than magnesium performance. However, the information related to their corrosion behaviour in biological media is insufficient. The aim of this work is to study the influence of the components of organic fluids on the corrosion behaviour of Mg and AZ31 and LAE442 alloys using potentiodynamic, potentiostatic and EIS techniques. Results showed localized attack in chloride containing media. The breakdown potential decreased when chloride concentration increased. The potential range of the passivation region was extended in the presence of albumin. EIS measurements showed that the corrosion behaviour of the AZ31 was very different from that of LAE442 alloy in chloride solutions.

  17. Miks ma end ära ei tapa : [luuletused] / Paul-Eerik Rummo

    Index Scriptorium Estoniae

    Rummo, Paul-Eerik, 1942-

    2001-01-01

    Tekst eesti ja inglise k. P.-E. Rummo lühibiograafia eesti ja inglise k. lk. 131. Sisu: Miks ma end ära ei tapa = Why I don't kill myself ; "Maailm mu hinge ei tungind, vaid imbus..." = "The world did not invade my soul, it seeped into it..." ; "Taevas on kummargil üle maa..." = "The sky stoops over the earth..." ; "Nüüd anna jumal jaksu joosta juhuste sajus..." = "Now grant me God the strength to run through the rains of chance..." ; Jälle, jälle, jälle, jälle, jälle... = Again again again again again ; "maailm mille lõpp on mõeldav..." = "a world whose end is conceivable..." ; Kinni hoidmas = Clinging ; Poolüminal = Crooning

  18. Development and Electrochemical Investigations of an EIS- (Electrolyte-Insulator-Semiconductor based Biosensor for Cyanide Detection

    Directory of Open Access Journals (Sweden)

    Michael J. Schöning

    2007-08-01

    Full Text Available A cyanide biosensor based on a pH-sensitive p-doped electrolyte-insulator-semiconductor (EIS structure with an immobilised enzyme (cyanidase is realised at thelaboratory scale. The immobilisation of the cyanidase is performed in two distinct steps:first, the covalent coupling of cyanidase to an N-hydroxysuccinimide- (NHS activatedSepharoseTM gel and then, the physical entrapment of NHS-activated SepharoseTM with theimmobilised cyanidase in a dialysis membrane onto the EIS structure. The immobilisationof the cyanidase to the NHS-activated SepharoseTM is studied by means of gelelectrophoresis measurements and investigations using an ammonia- (NH3 selectiveelectrode. For the electrochemical characterisation of the cyanide biosensor,capacitance/voltage and constant capacitance measurements, respectively, have beencarried out. A differential measurement procedure is presented to evaluate the cyanideconcentration-dependent biosensor signals.

  19. Energy information systems (EIS): Technology costs, benefit, and best practice uses

    Energy Technology Data Exchange (ETDEWEB)

    Granderson, Jessica; Lin, Guanjing; Piette, Mary Ann

    2013-11-26

    Energy information systems are the web-based software, data acquisition hardware, and communication systems used to store, analyze, and display building energy data. They often include analysis methods such as baselining, benchmarking, load profiling, and energy anomaly detection. This report documents a large-scale assessment of energy information system (EIS) uses, costs, and energy benefits, based on a series of focused case study investigations that are synthesized into generalizable findings. The overall objective is to provide organizational decision makers with the information they need to make informed choices as to whether or not to invest in an EIS--a promising technology that can enable up to 20 percent site energy savings, quick payback, and persistent low-energy performance when implemented as part of best-practice energy management programs.

  20. The DOE/AL cost and schedule control system (CS2) - A user's perspective in its use as both a reporting system and as a valuable project management tool

    International Nuclear Information System (INIS)

    Fate, Richard E.; Cox, Warren B.

    1992-01-01

    Sandia National Laboratories (SNL) Environmental Restoration (ER) Program has recently implemented a highly structured CS 2 required by DOE. It is a complex system which has evolved over a period of a year and a half. During the implementation of this system) problem areas were discovered in cost estimating, allocation of management costs, and integration of the CS 2 system with the Sandia Financial Information System. In addition to problem areas, benefits of the system were found in the areas of schedule adjustment, projecting personnel requirements, budgeting, and responding to audits. Finally, a number of lessons were learned regarding how to successfully implement the system. (author)

  1. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  2. Mid-Columbia Coho Reintroduction Feasibility Project. Final Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact

  3. Does emotional intelligence have a ‘dark’ side? A review of the literature

    Directory of Open Access Journals (Sweden)

    Sarah K Davis

    2016-08-01

    Full Text Available Emotional intelligence (EI was once touted as the ‘panacea’ for a satisfying and successful life. Consequently, there has been much emphasis on developing interventions to promote this personal resource in applied settings. Despite this, a growing body of research has begun to identify particular contexts when EI does not appear helpful and may even be deleterious to a person, or those they have contact with, suggesting a ‘dark’ side to the construct. This paper provides a review of emergent literature to examine when, why and how trait and ability EI may contribute to negative intrapersonal (psychological ill-health; stress reactivity and interpersonal outcomes (emotional manipulation; antisocial behaviour. Negative effects were found to operate across multiple contexts (health, academic, occupational however these were often indirect, suggesting that outcomes depend on pre-existing qualities of the person. Literature also points to the possibility of ‘optimal’ levels of EI – both within and across EI constructs. Uneven profiles of self-perceptions (trait facets or actual emotional skills contribute to poorer outcomes, particularly emotional awareness and management. Moreover, individuals who possess high levels of skill but have lower self-perceptions of their abilities fare worse that those with more balanced profiles. Future research must now improve methodological and statistical practices to better capture EI in context and the negative corollary associated with high levels.

  4. Ajude defitsiit : [kraadiõpe ei suuda katta isegi mitte prioriteetsete erialade vajadusi] / Jaan Laas

    Index Scriptorium Estoniae

    Laas, Jaan, 1938-

    2002-01-01

    Akadeemilise järelkasvu probleeme Eestis. Magistrite ja doktorite vähene koosseis ei vasta riigi majandusliku ja ühiskonna kultuurilise arengu vajadustele. 6.dets. 2001 Riigikogus heaks kiidetud dokumendis "Teadmistepõhine Eesti. Eesti teadus- ja arendustegevuse strateegia 2001-2006" prioriteedina märgitud erialad on kraadiõppega sama hästi kui katmata. Joon.: Teaduse finantseerimine 6 teadussuuna ja 59 teadusala lõikes a. 1998-2000

  5. PLASMA DIAGNOSTICS OF AN EIT WAVE OBSERVED BY HINODE/EIS AND SDO/AIA

    Energy Technology Data Exchange (ETDEWEB)

    Veronig, A. M.; Kienreich, I. W.; Muhr, N.; Temmer, M. [Institute of Physics, University of Graz, Universitaetsplatz 5, A-8010 Graz (Austria); Goemoery, P. [Astronomical Institute, Slovak Academy of Sciences, SK-05960 Tatranska Lomnica (Slovakia); Vrsnak, B. [Hvar Observatory, Faculty of Geodesy, Kaciceva 26, 1000 Zagreb (Croatia); Warren, H. P., E-mail: astrid.veronig@uni-graz.at [Space Science Division, Naval Research Laboratory, Washington, DC 20375 (United States)

    2011-12-10

    We present plasma diagnostics of an Extreme-Ultraviolet Imaging Telescope (EIT) wave observed with high cadence in Hinode/Extreme-Ultraviolet Imaging Spectrometer (EIS) sit-and-stare spectroscopy and Solar Dynamics Observatory/Atmospheric Imaging Assembly imagery obtained during the HOP-180 observing campaign on 2011 February 16. At the propagating EIT wave front, we observe downward plasma flows in the EIS Fe XII, Fe XIII, and Fe XVI spectral lines (log T Almost-Equal-To 6.1-6.4) with line-of-sight (LOS) velocities up to 20 km s{sup -1}. These redshifts are followed by blueshifts with upward velocities up to -5 km s{sup -1} indicating relaxation of the plasma behind the wave front. During the wave evolution, the downward velocity pulse steepens from a few km s{sup -1} up to 20 km s{sup -1} and subsequently decays, correlated with the relative changes of the line intensities. The expected increase of the plasma densities at the EIT wave front estimated from the observed intensity increase lies within the noise level of our density diagnostics from EIS Fe XIII 202/203 A line ratios. No significant LOS plasma motions are observed in the He II line, suggesting that the wave pulse was not strong enough to perturb the underlying chromosphere. This is consistent with the finding that no H{alpha} Moreton wave was associated with the event. The EIT wave propagating along the EIS slit reveals a strong deceleration of a Almost-Equal-To -540 m s{sup -2} and a start velocity of v{sub 0} Almost-Equal-To 590 km s{sup -1}. These findings are consistent with the passage of a coronal fast-mode MHD wave, pushing the plasma downward and compressing it at the coronal base.

  6. Põhjakeskuse tehingut ei saa tagasi pöörata / Anne Oja

    Index Scriptorium Estoniae

    Oja, Anne, 1970-

    2008-01-01

    Kobe Investmentsi partnerite Veljo Kuuse ja Kaire Kopli sõnul ei saa endine autoärimees Toomas Rüütmann Põhjakeskuse tehingut tagasi pöörata ning T. Rüütmann on keskuse projektist kätte saanud kordades enam raha, kui on sinna investeerinud. Vt. samas: Rüütmann väidab, et ta lasi varad arestida

  7. Andrzej Wajda : maailm küll teadis, aga ei hoolinud / Eda Post

    Index Scriptorium Estoniae

    Post, Eda, 1983-

    2008-01-01

    Poola filmi- ja teatrilavastaja Andrzej Wajda, kes pälvis sel aastal president Toomas Hendrik Ilveselt Maarjamaa Risti III klassi teenetemärgi. Tema viimasest mängufilmist "Katõn". Lisatud andmed elu ja töö kohta. Ordenit vastu võtma A. Wajda ei tule, sest 24. veebruaril 2008 läheb ta Los Angeleses Oscarite galale, kus tema film "Katõn" on parima võõrkeelse filmi auhinna nominent

  8. Tiigrihüppega ei paranda kingi ega osta leiba / Tarmo Mänd

    Index Scriptorium Estoniae

    Mänd, Tarmo, 1950-

    2007-01-01

    Ilmunud ka: Põhjarannik, 24. okt. 2007, lk. 2; Valgamaalane, 25. okt. 2007, lk. 2; Oma Saar, 25. okt. 2007, lk. 5; Vooremaa, 25. okt. 2007, lk. 2; Hiiu Leht, 26. okt. 2007, lk. 2; Harju Ekspress, 26. okt. 2007, lk. 6; Meie Maa, 27. okt. 2007, lk. 2; Koit, 30. okt. 2007, lk. 6. Riigikogus ei leidnud poolehoidu Rahvaliidu ettepanek suurendada uues eelarves valdadele mõeldud tulumaksu osa. Parlamendiliige loodab, et eelseisval eelarvekava menetlemisel riigikogus tõstatatakse see teema uuesti

  9. Kui ei maksa nüüd, maksad hiljem rohkem / Villu Zirnask

    Index Scriptorium Estoniae

    Zirnask, Villu, 1966-

    2008-01-01

    Autor toob kohe maksmise näitena Rootsi pankade päästmise 1990. aastate alguses ning hiljem maksmise näitena Jaapani, kus lasti hädas olevatel pankadel edasi toimetada. IMF-i analüütikute Luc Laeveni ja Fabian Valencia analüüsi põhjal on kohe maksmise variant üldiselt parem. Graafikud: Maailma finantskriisid 1970-2007. Lisa: Ei aastatki ilma kriisita

  10. ANALYSIS AND MODELING OF TWO FLARE LOOPS OBSERVED BY AIA AND EIS

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y.; Ding, M. D. [School of Astronomy and Space Science, Nanjing University, Nanjing 210093 (China); Qiu, J. [Department of Physics, Montana State University, Bozeman, MT 59717 (United States)

    2012-10-10

    We analyze and model an M1.0 flare observed by SDO/AIA and Hinode/EIS to investigate how flare loops are heated and evolve subsequently. The flare is composed of two distinctive loop systems observed in extreme ultraviolet (EUV) images. The UV 1600 A emission at the feet of these loops exhibits a rapid rise, followed by enhanced emission in different EUV channels observed by the Atmospheric Imaging Assembly (AIA) and the EUV Imaging Spectrometer (EIS). Such behavior is indicative of impulsive energy deposit and the subsequent response in overlying coronal loops that evolve through different temperatures. Using the method we recently developed, we infer empirical heating functions from the rapid rise of the UV light curves for the two loop systems, respectively, treating them as two big loops with cross-sectional area of 5'' by 5'', and compute the plasma evolution in the loops using the EBTEL model. We compute the synthetic EUV light curves, which, with the limitation of the model, reasonably agree with observed light curves obtained in multiple AIA channels and EIS lines: they show the same evolution trend and their magnitudes are comparable by within a factor of two. Furthermore, we also compare the computed mean enthalpy flow velocity with the Doppler shift measurements by EIS during the decay phase of the two loops. Our results suggest that the two different loops with different heating functions as inferred from their footpoint UV emission, combined with their different lengths as measured from imaging observations, give rise to different coronal plasma evolution patterns captured both in the model and in observations.

  11. Üleilmse finantskriisi leevenemist silmapiiril veel ei paista / Erik Aru

    Index Scriptorium Estoniae

    Aru, Erik

    2007-01-01

    Maailma rahaturgudel kestab veel krediidikriis. Mitme vaatleja hinnangul näitab see, et kriis pole lahenenud ka pärast intressimäära langetamist, et tegemist on tõsise probleemiga. Investeerimispanga Goldman Sachs peaökonomist Jan Hatzius soovitab intressi veelgi vähendada. Hinnanguid kahjumi suuruse kohta. Lisad: Pangandus - pidev kriiside allikas; Euroopa keskpankureid inflatsioon ei loksuta

  12. Briti teadlane: kübersõda ei tule / Thomas Rid ; intervjueerinud Raimo Poom

    Index Scriptorium Estoniae

    Rid, Thomas

    2013-01-01

    Sõjauuringute õppejõud Thomas Rid leiab, et internetis on palju ohte, kuid kübersõda ei ole üks neist. Ridi arvates on äärmiselt ebatõenäoline, et NATO käivitaks kunagi küberrünnaku tõttu 5. artikli. Interneti kõige suuremaks ohustajaks pole NSA, vaid vabadust piirata soovivad autoritaarsed riigid

  13. Kui sõnadest enam ei piisa, siis - muusika / Kadri Mälk

    Index Scriptorium Estoniae

    Mälk, Kadri, 1958-

    2008-01-01

    Rahvusvahelisest ehtekunstisündmusest "Schmuckszene" (peakorraldaja Wolfgang Lösche) Münchenis, peanäitusest (kuraator Ralph Turner) Müncheni messikeskuses, satelliitnäitustest. Eestist pääses peanäitusele Maarja Niinemägi, peapreemia sai Jantje Fleischhut. Kaasaegse ehtekunsti toetajate ühenduse (Die Fördergesellschaft Neuer Schmuck) aastapreemia sai Peter Chang. Võrdluseks Tanel Veenre näitusest "Kui sõnadest ei piisa" Hop-galeriis

  14. Afgaane ei saa aidata vaid läbi soomuki akna / Toomas Sildam

    Index Scriptorium Estoniae

    Sildam, Toomas, 1961-

    2005-01-01

    Põhja-Afganistani Mazar-e-Sharifi linnas brittide juhtimisel tegutseva provintsi ülesehitusmeeskonna koosseisu kuulub kaks Eesti üksust - vaatlusmeeskond ja Eesti kaitseväe demineerijate rühm. Kaitseministeeriumi plaani kohaselt saadetakse 2006. aastal Lõuna-Afganistani ligi 120 Eesti sõdurit. Kaart. Vt. samas lühiintervjuud kapten Tiit Paljakuga: Kapten Tiit Paljak: me ei tee afgaanide eest kõike ära

  15. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  16. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  17. Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa.

    Science.gov (United States)

    Aranda-Jan, Clara B; Mohutsiwa-Dibe, Neo; Loukanova, Svetla

    2014-02-21

    Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Forty-four studies on mHealth projects in Africa were included and classified as: "patient follow-up and medication adherence" (n = 19), "staff training, support and motivation" (n = 2), "staff evaluation, monitoring and guidelines compliance" (n = 4), "drug supply-chain and stock management" (n = 2), "patient education and awareness" (n = 1), "disease surveillance and intervention monitoring" (n = 4), "data collection/transfer and reporting" (n = 10) and "overview of mHealth projects" (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or lack of resources. mHealth in Africa is an innovative approach

  18. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) - Rocky Reach - Maple Valley

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Mark A. [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-04-16

    Vegetation Management along the Rocky Reach – Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and around structure landings for the purpose of maintaining access to structures site. All work will be in accordance with the National Electrical Safety Code and BPA standards.

  19. Medical Isotopes Production Project: Molybdenum-99 and related isotopes: Environmental Impact Statement, Volume I

    International Nuclear Information System (INIS)

    1996-04-01

    This Environmental Impact Statement (EIS) provides environmental and technical information concerning the U.S. Department of Energy's (DOE) proposal to establish a domestic source to produce molybdenum-99 (Mo-99) and related medical isotopes (iodine-131, xenon-133 and iodine-125). Mo-99, a radioactive isotope of the element molybdenum, decays to form metastable technetium-99 (Tc-99m), a radioactive isotope used thousands of times daily in medical diagnostic procedures in the U.S. Currently, all Mo-99 used in the U.S. is obtained from a single Canadian source. DOE is pursuing the Medical Isotopes Production Project in order to ensure that a reliable supply of Mo-99 is available to the U.S. medical community. Under DOE's preferred alternative, the Chemistry and Metallurgy Research Facility at the Los Alamos National Laboratory (LANL) and the Annular Core Research Reactor and Hot Cell Facility at Sandia National Laboratories/New Mexico (SNL/NM) would be used for production of the medical isotopes. In addition to the preferred alternative, three other reasonable alternatives and a no action alternative are analyzed in detail. The sites for the three reasonable alternatives are LANL, Oak Ridge National Laboratory (ORNL), and Idaho National Engineering Laboratory (INEL). The analyses in this EIS indicate no significant difference in the potential environmental impacts among the alternatives. Each of the alternatives would use essentially the same technology for the production of the medical isotopes. Minor differences in environmental impacts among alternatives relate to the extent of activity necessary to modify and restart (as necessary) existing reactors and hot cell facilities at each of the sites, the quantities, of low-level radioactive waste generated, how such waste would be managed, and the length of time needed for initial and full production capacity

  20. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holst, Kent (Iowa Stored Energy Plant Agency, Traer, IA); Huff, Georgianne; Schulte, Robert H. (Schulte Associates LLC, Northfield, MN); Critelli, Nicholas (Critelli Law Office PC, Des Moines, IA)

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  1. What Does It Mean to Be a Friendly Outsider? Critical Reflection on Finding a Role as an Action Researcher with Communities Developing Renewable Energy Projects

    Science.gov (United States)

    Rogers, Jennifer; Convery, Ian; Simmons, Eunice; Weatherall, Andrew

    2012-01-01

    This paper is a reflective account exploring the value of using action research in a relatively new context in the United Kingdom; the development of community renewable-energy projects. There is a strong rationale for using action research in this setting due to the synergies between the principles and practice of action research and localised…

  2. Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa

    Science.gov (United States)

    2014-01-01

    Background Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. Methods A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Results Forty-four studies on mHealth projects in Africa were included and classified as: “patient follow-up and medication adherence” (n = 19), “staff training, support and motivation” (n = 2), “staff evaluation, monitoring and guidelines compliance” (n = 4), “drug supply-chain and stock management” (n = 2), “patient education and awareness” (n = 1), “disease surveillance and intervention monitoring” (n = 4), “data collection/transfer and reporting” (n = 10) and “overview of mHealth projects” (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or

  3. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  4. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W PandT) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012

  5. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Freeman-Pollard, Jhivaun R. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  6. A combined SEM, CV and EIS study of multi-layered porous ceramic reactors for flue gas purification

    DEFF Research Database (Denmark)

    He, Zeming; Andersen, Kjeld Bøhm; Nygaard, Frederik Berg

    2013-01-01

    The effect of sintering temperature of 12-layered porous ceramic reactors (comprising 5 cells) was studied using scanning electron microscopy (SEM), cyclic voltammetry (CV) and electrochemical impedance spectroscopy (EIS). The difference in microstructures of the reactors was evaluated by SEM...

  7. Dive Data from Expedition Information System (EIS) for Islands in the Stream 2002 - Deep Reef Habitat - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Expeditions Information System (EIS) contains information recorded by the NOAA Office of Ocean Exploration's data manager during the 2002 "Islands in the Stream...

  8. Predicting risk of school refusal: Examining the incremental role of trait EI beyond personality and emotion regulation

    Directory of Open Access Journals (Sweden)

    Filippello Pina

    2018-01-01

    Full Text Available Research has not yet been deepened in the link between personality factors and risk of school refusal. Furthermore, previous studies fail to verify the direct relation between trait EI and the risk of school refusal. The present study examined personality traits, emotion regulation and trait EI for the contributory role they may play in predicting the risk of school refusal. The sample consisted of 311 participants, 112 males (36% and 199 females (64% with an average age of 14.19 (SD = .60, from a high school in the city of Messina (Sicily, Italy. Results show that the risk of school refusal is positively related to neuroticism and maladaptive emotion regulation strategies, while it is negatively related to the extroversion, agreeableness and conscientiousness and trait EI. Moreover, trait EI can be considered as a strong incremental negative predictor of risk of school refusal over and above personality traits and emotion regulation.

  9. Final Technical Report Advanced Anchoring Technology DOE Award Number DE-EE0003632 Project Period 09/10 - 09/12

    Energy Technology Data Exchange (ETDEWEB)

    Meggitt, Dallas J

    2012-11-09

    It is generally conceded that the costs associated with current practices for the mooring, anchoring, or foundation systems of Marine HydroKinetic (MHK) and Deepwater Floating Wind systems are a disproportionate portion of the total cost of an installed system. Reducing the cost of the mooring and anchoring components for MHK systems can contribute substantially to reducing the levelized cost of electricity (LCOE). Micropile anchors can reduce the LCOE both directly, because the anchors, associated mooring hardware and installation costs are less than conventional anchor and mooring systems, but also because micropile anchors require less extensive geotechnical surveys for confident design and proper implementation of an anchor or foundation system. This report presents the results of the development of critical elements of grouted marine micropile anchor (MMA) technology for application to MHK energy conversion systems and other ocean engineering applications that require fixing equipment to the seafloor. Specifically, this project identified grout formulations and developed designs for grout dispensing systems suitable for use in a seawater environment as a critical development need for successful implementation of practical MMA systems. The project conducted a thorough review of available information on the use of cement-based grouts in seawater. Based on this review and data available from commercial sources, the project selected a range of grout formulations for testing as part of a micropile system. The project also reviewed instrumentation for measuring grout density, pressure and flow rate, and integrated an instrumentation system suitable for use with micropile installation. The grout formulations and instrumentation system were tested successfully and demonstrated the suitability of MMA technology for implementation into anchor systems for MHK and other marine renewable energy systems. In addition, this project developed conceptual designs for micropile

  10. Arabidopsis thaliana Ei-5: Minor Vein Architecture Adjustment Compensates for Low Vein Density in Support of Photosynthesis.

    Science.gov (United States)

    Stewart, Jared J; Polutchko, Stephanie K; Demmig-Adams, Barbara; Adams, William W

    2018-01-01

    An Arabidopsis thaliana accession with naturally low vein density, Eifel-5 (Ei-5), was compared to Columbia-0 (Col-0) with respect to rosette growth, foliar vein architecture, photosynthesis, and transpiration. In addition to having to a lower vein density, Ei-5 grew more slowly, with significantly lower rates of rosette expansion, but had similar capacities for photosynthetic oxygen evolution on a leaf area basis compared to Col-0. The individual foliar minor veins were larger in Ei-5, with a greater number of vascular cells per vein, compared to Col-0. This compensation for low vein density resulted in similar values for the product of vein density × phloem cell number per minor vein in Ei-5 and Col-0, which suggests a similar capacity for foliar sugar export to support similar photosynthetic capacities per unit leaf area. In contrast, the product of vein density × xylem cell number per minor vein was significantly greater in Ei-5 compared to Col-0, and was associated not only with a higher ratio of water-transporting tracheary elements versus sugar-transporting sieve elements but also significantly higher foliar transpiration rates per leaf area in Ei-5. In contrast, previous studies in other systems had reported higher ratios of tracheary to sieve elements and higher transpiration rate to be associated with higher - rather than lower - vein densities. The Ei-5 accession thus further underscores the plasticity of the foliar vasculature by illustrating an example where a higher ratio of tracheary to sieve elements is associated with a lower vein density. Establishment of the Ei-5 accession, with a low vein density but an apparent overcapacity for water flux through the foliar xylem network, may have been facilitated by a higher level of precipitation in its habitat of origin compared to that of the Col-0 accession.

  11. What Does It Mean for Something to Be "Scientific"? Community Understandings of Science, Educational Attainment, and Community Representation Among a Sample of 25 CBPR Projects.

    Science.gov (United States)

    Spears Johnson, Chaya R; Kraemer Diaz, Anne E; Arcury, Thomas A

    2017-04-01

    Community-based participatory research (CBPR) seeks to conduct relevant, sustainable research that is tailored to the needs of the communities with which it is engaged through equitable collaboration between community representatives and professional researchers. Like other participatory approaches to research and planning, CBPR has been criticized for the potential to engage a biased sample of community representatives and, thereby, undermine the fundamental purpose of the approach. Moreover, the varying educational levels and areas of expertise, especially regarding science literacy, among those participating in CBPR has raised concern about the ability for true collaboration to exist within CBPR projects. This article presents findings from a qualitative study of 25 CBPR research projects and explores matters of science literacy, community representation, and the nature of CBPR. Ultimately, it is suggested that those who engage in CBPR should carefully consider the potential for biased community representation and seek to purposely and mindfully avoid any partiality.

  12. Energy Return on Energy Invested (ERoEI) for photovoltaic solar systems in regions of moderate insolation

    International Nuclear Information System (INIS)

    Ferroni, Ferruccio; Hopkirk, Robert J.

    2016-01-01

    Many people believe renewable energy sources to be capable of substituting fossil or nuclear energy. However there exist very few scientifically sound studies, which apply due diligence to substantiating this impression. In the present paper, the case of photovoltaic power sources in regions of moderate insolation is analysed critically by using the concept of Energy Return on Energy Invested (ERoEI, also called EROI). But the methodology for calculating the ERoEI differs greatly from author-to-author. The main differences between solar PV Systems are between the current ERoEI and what is called the extended ERoEI (ERoEI EXT ). The current methodology recommended by the International Energy Agency is not strictly applicable for comparing photovoltaic (PV) power generation with other systems. The main reasons are due to the fact that on one hand, solar electricity is very material-intensive, labour-intensive and capital-intensive and on the other hand the solar radiation exhibits a rather low power density. - Highlights: •Data are available from several years of photovoltaic energy experience in northern Europe. •These are used to show the way to calculate a full, extended ERoEI. •The viability and sustainability in these latitudes of photovoltaic energy is questioned. •Use of photovoltaic technology is shown to result in creation of an energy sink.

  13. Acetylcholinesterase Inhibitors (AChEI's for the treatment of visual hallucinations in schizophrenia: A review of the literature

    Directory of Open Access Journals (Sweden)

    Patel Sachin S

    2010-09-01

    Full Text Available Abstract Background Visual hallucinations occur in various neurological diseases, but are most prominent in Lewy body dementia, Parkinson's disease and schizophrenia. The lifetime prevalence of visual hallucinations in patients with schizophrenia is much more common than conventionally thought and ranges from 24% to 72%. Cortical acetylcholine (ACh depletion has been associated with visual hallucinations; the level of depletion being related directly to the severity of the symptoms. Current understanding of neurobiological visual processing and research in diseases with reduced cholinergic function, suggests that AChEI's may prove beneficial in treating visual hallucinations. This offers the potential for targeted drug therapy of clinically symptomatic visual hallucinations in patients with schizophrenia using acetylcholinesterase inhibition. Methods A systematic review was carried out investigating the evidence for the effects of AChEI's in treating visual hallucinations in Schizophrenia. Results No evidence was found relating to the specific role of AChEI's in treating visual hallucinations in this patient group. Discussion Given the use of AChEI's in targeted, symptom specific treatment in other neuropsychiatric disorders, it is surprising to find no related literature in schizophrenia patients. The use of AChEI's in schizophrenia has investigated effects on cognition primarily with non cognitive effects measured more broadly. Conclusions We would suggest that more focused research into the effects of AChEI's on positive symptoms of schizophrenia, specifically visual hallucinations, is needed.

  14. Management does matter

    DEFF Research Database (Denmark)

    Kroustrup, Jonas

    studies approach the paper acknowledges that management and project management technologies does matter, but comes in many shapes, and is performed differently in various socio-technical settings. The field of STS offers a new ground for a participatory and practice oriented approach to the development......The positivist and managerialist approaches to project management research has historically defined practice as a ‘technical’ discipline. This has recently been challenged by critical project management studies, who advocates for an opening of the field research to also include the social...... and organizational dynamics of projects. Following the topic of the panel this paper will discuss how these two positions, although seemingly different, both places the project manager as an omnipotent subject of control. The consequences becomes either a priori explanations or ideological pitfalls. From a science...

  15. Test plan for in situ bioremediation demonstration of the Savannah River Integrated Demonstration Project DOE/OTD TTP No.: SR 0566-01. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, T.C.

    1991-09-18

    This project is designed to demonstrate in situ bioremediation of groundwater and sediment contaminated with chlorinated solvents. Indigenous microorganisms will be simulated to degrade trichloroethylene (TCE), tetrachloroethylene (PCE) and their daughter products in situ by addition of nutrients to the contaminated zone. in situ biodegradation is a highly attractive technology for remediation because contaminants are destroyed, not simply moved to another location or immobilized, thus decreasing costs, risks, and time, while increasing efficiency and public and regulatory acceptability. Bioremediation has been found to be among the least costly technologies in applications where it will work.

  16. Quantitative Correlational Study: Emotional Intelligence and Project Outcomes among Hispanics in Technology

    Science.gov (United States)

    Trejo, Arturo

    2013-01-01

    The present quantitative correlational research study explored relationships between Emotional Intelligence (EI) competencies, such as self-awareness, self-management, social awareness, and relationship management, and project management outcomes: scope creep, in-budget project cost, and project timeliness. The study was conducted within the…

  17. Dereplication of pentacyclic triterpenoids in plants by GC-EI/MS.

    Science.gov (United States)

    Gu, Jian-Qiao; Wang, Yuehong; Franzblau, Scott G; Montenegro, Gloria; Timmermann, Barbara N

    2006-01-01

    Three common plant-derived pentacyclic triterpenoids, oleanolic acid (1), betulinic acid (2) and ursolic acid (3), have been found to exhibit moderate anti-tubercular activity in a microplate alamar blue assay. In order to facilitate the discovery of novel anti-tubercular leads with diverse chemical structures, a new and rapid GC-EI/MS method was developed simultaneously and unambiguously to dereplicate 1-3 as their methyl esters with limits of detection of 25.6, 26.9 and 26.8 ng, respectively.

  18. Corrosion Protection Performance of Polyester-Melamine Coating with Natural Wood Fiber Using EIS Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Shin, PyongHwa; Shon, MinYoung [Pukyong National University, Busan (Korea, Republic of); Jo, DuHwan [POSCO, Gwangyang (Korea, Republic of)

    2016-04-15

    In the present study, polyester-melamine coating systems with natural wood fiber (NWF) were prepared and the effects of NWF on the corrosion protectiveness of the polyester-melamine coating were examined using EIS analysis. From the results, higher average surface roughness was observed with increase of NWF content. Water diffusivity and water uptake into the polyester-melamine coatings with NWF were much higher than that into the pure polyester-melamine coating. The decrease in the impedance modulus |Z| was associated with the localized corrosion on carbon steel, confirming that corrosion protection of the polyester-melamine coatings with NWF well agrees with its water transport behavior.

  19. Õiguste kaitse ei tohi sõltuda rahakoti paksusest / Ken-Marti Vaher

    Index Scriptorium Estoniae

    Vaher, Ken-Marti, 1974-

    2005-01-01

    Riigi õigusabi seadusest, mis rakendub 1. märtsist 2005. Sama ka Pärnu Postimees 1. märts 2005, lk. 15 ; Võrumaa Teataja 1. märts 2005, lk. 2 ; Koit 1. märts 2005, lk. 6 ; Põhjarannik 1. märts 2005, lk. 2 ; Vali Uudised 4. märts 2005, lk. 2 ; Vooremaa 5. märts 2005, lk. 2 ; Meie Maa 10. märts 2005, lk. 2 ; Järva Teataja 5. märts 2005, lk. 2 artiklis pealkiri kujul: õiguste kaitse ei sõltu rahakotist ; Videvik 10. märts 2005, lk. 5

  20. The Application of EIS and PIV Methods to the Measurement of Aerated Flow

    Directory of Open Access Journals (Sweden)

    Fejfarová M.

    2013-04-01

    Full Text Available The paper describes measurements in the aerated water medium using modern methods PIV (Particle Image Velocimetry and EIS (Electrical Impedance Spectrometry, which are applied in the Laboratory of Water Management Research (LVV of the Department of Water Structures (UVST at the Faculty of Civil Engineering (FAST of Brno University of Technology (VUT. Measurements of the water medium were carried out for three different aeration intensities at special experimental workplaces. The experiment was focused on the capability of the methods to monitor the air content in the water.

  1. How Does a Regional Climate Model Modify the Projected Climate Change Signal of the Driving GCM: A Study over Different CORDEX Regions Using REMO

    Directory of Open Access Journals (Sweden)

    Claas Teichmann

    2013-06-01

    Full Text Available Global and regional climate model simulations are frequently used for regional climate change assessments and in climate impact modeling studies. To reflect the inherent and methodological uncertainties in climate modeling, the assessment of regional climate change requires ensemble simulations from different global and regional climate model combinations. To interpret the spread of simulated results, it is useful to understand how the climate change signal is modified in the GCM-RCM modelmodelgeneral circulation model-regional climate model (GCM-RCM chain. This kind of information can also be useful for impact modelers; for the process of experiment design and when interpreting model results. In this study, we investigate how the simulated historical and future climate of the Max-Planck-Institute earth system model (MPI-ESM is modified by dynamic downscaling with the regional model REMO in different world regions. The historical climate simulations for 1950–2005 are driven by observed anthropogenic forcing. The climate projections are driven by projected anthropogenic forcing according to different Representative Concentration Pathways (RCPs. The global simulations are downscaled with REMO over the Coordinated Regional Climate Downscaling Experiment (CORDEX domains Africa, Europe, South America and West Asia from 2006–2100. This unique set of simulations allows for climate type specific analysis across multiple world regions and for multi-scenarios. We used a classification of climate types by Köppen-Trewartha to define evaluation regions with certain climate conditions. A systematic comparison of near-surface temperature and precipitation simulated by the regional and the global model is done. In general, the historical time period is well represented by the GCM and the RCM. Some different biases occur in the RCM compared to the GCM as in the Amazon Basin, northern Africa and the West Asian domain. Both models project similar warming

  2. Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985

    Energy Technology Data Exchange (ETDEWEB)

    Durham, C.O. Jr.; O' Brien, F.D.; Rodgers, R.W. (eds.)

    1985-01-01

    This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

  3. Environmental assessment for DOE permission for the off-loading and transportation of commercial low-level radioactive waste across the Savannah River Site

    International Nuclear Information System (INIS)

    1997-10-01

    The Department of Energy (DOE) prepared this Environmental Assessment (EA) to assess the potential environmental impacts associated with DOE allowing Chem-Nuclear Systems, L.L.C. (CNS) to off-load and transport low-level radioactive waste (LLW) packages across the Savannah River Site (SRS), located near Aiken, South Carolina, to the nearby CNS facility. The proposed action entails DOE granting permission to CNS to use SRS for landing shipping barges at the existing SRS boat ramp and off-loading trailered LLW packages for transportation across SRS to the CNS facility. Project activities would include modification of the SRS boat ramp on the Savannah River, as needed for off-loading activities, and construction of a bridge across Lower Three Runs. The proposed action also encompasses any similar future off-loading and transportation activities for LLW en route to the CNS facility. The National Environmental Policy Act requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an Environmental Impact Statement (EIS)

  4. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  5. EIS study on corrosion and scale processes and their inhibition in cooling system media

    Energy Technology Data Exchange (ETDEWEB)

    Marin-Cruz, J. [Universidad Autonoma Metropolitana, Departamento de Quimica, Apdo. Postal 55-534, 09340 Mexico, DF (Mexico) and Instituto Mexicano del Petroleo, Coordinacion de Ingenieria Molecular, Competencia de Quimica Aplicada, Eje Central Lazaro Cardenas No. 152, CP 07730, DF (Mexico)]. E-mail: jmarin@imp.mx; Cabrera-Sierra, R. [Universidad Autonoma Metropolitana, Departamento de Quimica, Apdo. Postal 55-534, 09340 Mexico, DF (Mexico); Escuela Superior de Ingenieria Quimica e Industrias Extractivas (ESIQIE-IPN), Departamento de Metalurgia, UPALM Zacatenco AP 75-874, CP 07338, DF (Mexico); Pech-Canul, M.A. [Departamento de Fisica Aplicada, Centro de Investigacion y de Estudios, Avanzados del IPN, AP 73 Cordemex, CP 97310, Merida, Yucatan (Mexico); Gonzalez, I. [Universidad Autonoma Metropolitana, Departamento de Quimica, Apdo. Postal 55-534, 09340 Mexico, DF (Mexico)]. E-mail: igm@xanum.uam.mx

    2006-01-20

    A study of the carbon steel/cooling water interface was carried out using electrochemical impedance spectroscopy (EIS). EIS spectra reveal that a layer of corrosion and scale products forms naturally and evolves with the immersion time modifying the carbon steel/cooling water interface and giving rise to corrosion and scale processes. In addition, the nature of the layer formed on the metal was found to depend on the inhibitor used. It was established that the corrosion inhibitor (hydroxyphosphonoacetic acid (HPA)) chelates with Ca(II) ion generating a layer with resistive properties that provides good protection against corrosion. In contrast, the scale inhibitor (1-hydroxy-ethane-1,1-diphosphonic acid (HEDP)) is incorporated into the calcium carbonate crystals at the surface, modifying the structure and diminishing scale formation in the surface; this additive additionally inhibited corrosion. These observations were supported by scanning electronic microscopy (SEM) and corroborate previous studies performed by other techniques on HPA and HEDP. Finally, a synergistic effect was observed between these inhibitors that provides good protection to steel against corrosion and scaling in cooling media.

  6. Evaluation of the corrosion resistance of anodized aluminum 6061 using electrochemical impedance spectroscopy (EIS)

    Energy Technology Data Exchange (ETDEWEB)

    Huang Yuelong [Corrosion and Environmental Effects Laboratory (CEEL), Mork Family Department of Chemical Engineering and Materials Science, University of Southern California, Los Angeles, CA 90089-0241 (United States); Shih Hong [Lam Research Corporation, 4400 Cushing Parkway, Fremont, CA 94538 (United States)], E-mail: hong.shih@lamrc.com; Huang, Huochuan; Daugherty, John; Wu Shun; Ramanathan, Sivakami; Chang, Chris [Lam Research Corporation, 4400 Cushing Parkway, Fremont, CA 94538 (United States); Mansfeld, Florian [Corrosion and Environmental Effects Laboratory (CEEL), Mork Family Department of Chemical Engineering and Materials Science, University of Southern California, Los Angeles, CA 90089-0241 (United States)], E-mail: mansfeld@usc.edu

    2008-12-15

    The corrosion resistance of anodized Al 6061 produced by two different anodizing and sealing processes was evaluated using electrochemical impedance spectroscopy (EIS). The scanning electron microscope (SEM) was employed to determine the surface structure and the thickness of the anodized layers. The EIS data revealed that there was very little change of the properties of the anodized layers for samples that were hard anodized in a mixed acid solution and sealed in hot water over a 365 day exposure period in a 3.5 wt% NaCl solution. The specific admittance A{sub s} and the breakpoint frequency f{sub b} remained constant with exposure time confirming that the hard anodizing process used in this study was very effective in providing excellent corrosion resistance of anodized Al 6061 over extended exposure periods. Some minor degradation of the protective properties of the anodized layers was observed for samples that were hard anodized in H{sub 2}SO{sub 4} and exposed to the NaCl solution for 14 days.

  7. EIS study on corrosion and scale processes and their inhibition in cooling system media

    International Nuclear Information System (INIS)

    Marin-Cruz, J.; Cabrera-Sierra, R.; Pech-Canul, M.A.; Gonzalez, I.

    2006-01-01

    A study of the carbon steel/cooling water interface was carried out using electrochemical impedance spectroscopy (EIS). EIS spectra reveal that a layer of corrosion and scale products forms naturally and evolves with the immersion time modifying the carbon steel/cooling water interface and giving rise to corrosion and scale processes. In addition, the nature of the layer formed on the metal was found to depend on the inhibitor used. It was established that the corrosion inhibitor (hydroxyphosphonoacetic acid (HPA)) chelates with Ca(II) ion generating a layer with resistive properties that provides good protection against corrosion. In contrast, the scale inhibitor (1-hydroxy-ethane-1,1-diphosphonic acid (HEDP)) is incorporated into the calcium carbonate crystals at the surface, modifying the structure and diminishing scale formation in the surface; this additive additionally inhibited corrosion. These observations were supported by scanning electronic microscopy (SEM) and corroborate previous studies performed by other techniques on HPA and HEDP. Finally, a synergistic effect was observed between these inhibitors that provides good protection to steel against corrosion and scaling in cooling media

  8. E-I balance emerges naturally from continuous Hebbian learning in autonomous neural networks.

    Science.gov (United States)

    Trapp, Philip; Echeveste, Rodrigo; Gros, Claudius

    2018-06-12

    Spontaneous brain activity is characterized in part by a balanced asynchronous chaotic state. Cortical recordings show that excitatory (E) and inhibitory (I) drivings in the E-I balanced state are substantially larger than the overall input. We show that such a state arises naturally in fully adapting networks which are deterministic, autonomously active and not subject to stochastic external or internal drivings. Temporary imbalances between excitatory and inhibitory inputs lead to large but short-lived activity bursts that stabilize irregular dynamics. We simulate autonomous networks of rate-encoding neurons for which all synaptic weights are plastic and subject to a Hebbian plasticity rule, the flux rule, that can be derived from the stationarity principle of statistical learning. Moreover, the average firing rate is regulated individually via a standard homeostatic adaption of the bias of each neuron's input-output non-linear function. Additionally, networks with and without short-term plasticity are considered. E-I balance may arise only when the mean excitatory and inhibitory weights are themselves balanced, modulo the overall activity level. We show that synaptic weight balance, which has been considered hitherto as given, naturally arises in autonomous neural networks when the here considered self-limiting Hebbian synaptic plasticity rule is continuously active.

  9. Facts and artefacts regarding correlation between skin electrical impedance spectroscopy (EIS) and blood glucose

    International Nuclear Information System (INIS)

    Ollmar, Stig; Nicander, Ingrid; Åberg, Peter; Bolinder, Jan

    2013-01-01

    Earlier observations on possible co-variation between skin EIS and blood glucose prompted us to map and include other factors at play in the predictive model. Skin pH would be one such factor. A cohort of 20 diabetics was investigated, taking around 30 measurements spread over each of two different days 2–21 days apart. Each measurement comprises skin EIT in the frequency range 1kHz to 2.5MHz, skin pH, and immediately evaluated blood samples. There is a co-variation for some, but not all, test persons. The relationship gets stronger on the group level by adding pH-information, but is still poor or non-existent for some test persons. Non-invasive EIS measurements on skin is influenced by skin hydration, blood glucose, skin pH, body location, season, environmental factors, and variables not yet understood. Since impedance related parameters are used to estimate skin hydration, users of such devices should be aware that skin pH may influence as much as the water content of the stratum corneum.

  10. Evaluation of the corrosion resistance of anodized aluminum 6061 using electrochemical impedance spectroscopy (EIS)

    International Nuclear Information System (INIS)

    Huang Yuelong; Shih Hong; Huang, Huochuan; Daugherty, John; Wu Shun; Ramanathan, Sivakami; Chang, Chris; Mansfeld, Florian

    2008-01-01

    The corrosion resistance of anodized Al 6061 produced by two different anodizing and sealing processes was evaluated using electrochemical impedance spectroscopy (EIS). The scanning electron microscope (SEM) was employed to determine the surface structure and the thickness of the anodized layers. The EIS data revealed that there was very little change of the properties of the anodized layers for samples that were hard anodized in a mixed acid solution and sealed in hot water over a 365 day exposure period in a 3.5 wt% NaCl solution. The specific admittance A s and the breakpoint frequency f b remained constant with exposure time confirming that the hard anodizing process used in this study was very effective in providing excellent corrosion resistance of anodized Al 6061 over extended exposure periods. Some minor degradation of the protective properties of the anodized layers was observed for samples that were hard anodized in H 2 SO 4 and exposed to the NaCl solution for 14 days

  11. Fuzzy logic modeling of EIS measurements on lithium-ion batteries

    International Nuclear Information System (INIS)

    Singh, Pritpal; Vinjamuri, Ramana; Wang, Xiquan; Reisner, David

    2006-01-01

    A fuzzy logic-based state of health (SOH) meter is being developed for lithium-ion (Li-ion) batteries for potential use in portable defibrillators. Electrochemical impedance spectroscopy (EIS) measurements have been made from which input parameters for a fuzzy logic model to estimate the state of charge (SOC) and SOH are derived. The batteries are discharged continuously at a 1.4 A load current to simulate the constant current draw during the monitoring and recording of a patient's EKG, and periodically interrupted by 10 A pulses to simulate the battery discharge to charge up the capacitor that is in turn discharged to supply high voltage to the electrodes for the defibrillation of the patient. The test procedures included both voltage recovery and EIS measurements, and were made as the batteries were being discharged and over 30 charge/discharge cycles. Accurate models have been developed to estimate the number of pulses that the battery pack can deliver at various stages of its cycle life (SOC measure) and the number of charge/discharge cycles (SOH measure) that it had undergone

  12. Facts and artefacts regarding correlation between skin electrical impedance spectroscopy (EIS) and blood glucose

    Science.gov (United States)

    Ollmar, Stig; Nicander, Ingrid; Åberg, Peter; Bolinder, Jan

    2013-04-01

    Earlier observations on possible co-variation between skin EIS and blood glucose prompted us to map and include other factors at play in the predictive model. Skin pH would be one such factor. A cohort of 20 diabetics was investigated, taking around 30 measurements spread over each of two different days 2-21 days apart. Each measurement comprises skin EIT in the frequency range 1kHz to 2.5MHz, skin pH, and immediately evaluated blood samples. There is a co-variation for some, but not all, test persons. The relationship gets stronger on the group level by adding pH-information, but is still poor or non-existent for some test persons. Non-invasive EIS measurements on skin is influenced by skin hydration, blood glucose, skin pH, body location, season, environmental factors, and variables not yet understood. Since impedance related parameters are used to estimate skin hydration, users of such devices should be aware that skin pH may influence as much as the water content of the stratum corneum.

  13. DOE management

    International Nuclear Information System (INIS)

    Rezendes, V.S.

    1991-07-01

    This paper reports that GAO, as well as the Department of Energy's Inspector General, have pointed out the need for major improvement in the University of California's management of the three DOE laboratories-Lawrence Livermore, Los Alamos, and Lawrence Berkeley- and DOE oversight of that management effort. GAO found problems with University of California controls over laboratory operations, such as managing property, protecting classified documents, and ensuring that subcontractors are not subject to foreign influence, which might lead to transfers of nuclear technology to foreign influence, which might lead to transfers of nuclear technology or materials to foreign countries. In addition, clauses in the University of California contracts hamper DOE's ability to effectively manage the laboratories. DOE has addressed many of the specific problems that GAO identified and has tried to improve overall contract management. Negotiations with the University of California to extend the laboratory contracts will present another opportunity for DOE to take a firm stance on the need for management improvements. Having appropriate procedures and resources in place would also help DOE carry out its administration of contracts

  14. Accuracy of past projections of US energy consumption

    International Nuclear Information System (INIS)

    O'Neill, B.C.; Desai, Mausami

    2005-01-01

    Energy forecasts play a key role in development of energy and environmental policy. Evaluations of the accuracy of past projections can provide insight into the uncertainty that may be associated with current forecasts. They can also be used to identify sources of inaccuracies, and potentially lead to improvements in projections over time. Here we assess the accuracy of projections of US energy consumption produced by the Energy Information Administration over the period 1982-2000. We find that energy consumption projections have tended to underestimate future consumption. Projections 10-13 years into the future have had an average error of about 4%, and about half that for shorter time horizons. These errors mask much larger, offsetting errors in the projection of GDP and energy intensity (EI). GDP projections have consistently been too high, and EI projection consistently too low, by more than 15% for projections of 10 years or more. Further work on the source of these sizable inaccuracies should be a high priority. Finally, we find no evidence of improvement in projections of consumption, GDP, or EI since 1982

  15. Medical Isotopes Production Project: Molybdenum-99 and related isotopes - environmental impact statement. Volume II, comment response document

    International Nuclear Information System (INIS)

    1996-04-01

    This Environmental Impact Statement (EIS) provides environmental and technical information concerning the U.S. Department of Energy's (DOE) proposal to establish a domestic source to produce molybdenum-99 (Mo-99) and related isotopes (iodine-131, xenon-133, and iodine-125). Mo-99, a radioactive isotope of the element molybdenum, decays to form metastable technetium-99 (Tc-99m), a radioactive isotope used thousands of times daily in medical diagnostic procedures in the U.S. Currently, all Mo-99 used in the U.S. is obtained from a single Canadian source. DOE is pursuing the Medical Isotopes Production Project in order to ensure that a reliable supply of Mo-99 is available to the U.S. medical community as soon as practicable. Under DOE's preferred alternative, the Chemistry and Metallurgy Research Facility at the Los Alamos National Laboratory (LANL) and the Annular Core Research Reactor and Hot Cell Facility at Sandia National Laboratories/New Mexico (SNL/NM) would be used for production of the medical isotopes. In addition, three other reasonable alternatives and a No Action alternative are analyzed in detail, The sites for these three reasonable alternatives are LANL, Oak Ridge National Laboratory (ORNL), and Idaho National Engineering Laboratory (INEL). The analyses in this EIS indicate no significant difference in the potential environmental impacts among the alternatives. Each of the alternatives would use essentially the same technology for the production of the medical isotopes. Minor differences in environmental impacts among alternatives relate to the extent of activity necessary to modify and restart (as necessary) existing reactors and hot cell facilities at each of the sites, the quantities of low-level radioactive waste generated, how such waste would be managed, and the length of time needed for initial and full production capacity. This document contains comments recieved from meetings held regarding the site selection for isotope production

  16. Development of the chemical stabilization and solidification process for the treatment of radioactive raffinate sludges at the DOE Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Cole, P.M.; Kakaria, V.; Enger, J.

    1996-01-01

    Chemical Solidification and Stabilization (CSS) is the mixing of chemical reagents with waste to solidify and chemically stabilize the contaminated material. The resulting product is resistant to leaching of certain contaminants. CSS treatment using Class C fly ash and Portland cement was chosen as the most feasible method for treatment of the chemically and radioactively contaminated sludge (raffinate) contained in raffinate pits on the Weldon Spring Site Remedial Action Project (WSSRAP) located outside of St. Louis, Missouri. Due to the uniqueness of the material, substantial bench-scale testing was performed on the raffinate to better understand its properties. Similarly, due to mixed results in the application of CSS treatment to radioactive materials, a pilot-scale testing facility was built to verify bench testing results and to establish and quantify design parameters for the full-scale CSS production facility. This paper discusses the development of the pilot-scale testing facility, the testing plan, and the results of the testing activities. Particular attention has been given to the applicability of the CSS treatment method and to the value of pilot-scale testing

  17. Projection of young-old and old-old with functional disability: does accounting for the changing educational composition of the elderly population make a difference?

    Directory of Open Access Journals (Sweden)

    John P Ansah

    Full Text Available This study compares projections, up to year 2040, of young-old (aged 60-79 and old-old (aged 80+ with functional disability in Singapore with and without accounting for the changing educational composition of the Singaporean elderly. Two multi-state population models, with and without accounting for educational composition respectively, were developed, parameterized with age-gender-(education-specific transition probabilities (between active, functional disability and death states estimated from two waves (2009 and 2011 of a nationally representative survey of community-dwelling Singaporeans aged ≥ 60 years (N=4,990. Probabilistic sensitivity analysis with the bootstrap method was used to obtain the 95% confidence interval of the transition probabilities. Not accounting for educational composition overestimated the young-old with functional disability by 65 percent and underestimated the old-old by 20 percent in 2040. Accounting for educational composition, the proportion of old-old with functional disability increased from 40.8 percent in 2000 to 64.4 percent by 2040; not accounting for educational composition, the proportion in 2040 was 49.4 percent. Since the health profiles, and hence care needs, of the old-old differ from those of the young-old, health care service utilization and expenditure and the demand for formal and informal caregiving will be affected, impacting health and long-term care policy.

  18. Leisure-Time Physical Activity Does not Attenuate the Association Between Occupational Sedentary Behavior and Obesity: Results From Alberta's Tomorrow Project.

    Science.gov (United States)

    Nicholas, Joshua A; Lo Siou, Geraldine; Lynch, Brigid M; Robson, Paula J; Friedenreich, Christine M; Csizmadi, Ilona

    2015-12-01

    Sedentary behavior has been proposed as a risk factor for obesity that is distinct from physical inactivity. This study aimed to examine the association between occupational sedentary behavior and obesity, and to determine if this association is independent of leisure-time physical activity (LTPA). Fully employed participants enrolled between 2001 and 2008 to Alberta's Tomorrow Project, a prospective cohort study in Alberta, Canada, were studied (n = 12,409). Associations between occupational sedentary behavior and waist circumference (WC), waist-to-hip ratio (WHR), and body mass index (BMI) were examined using multiple binary and multinomial logistic regressions. In men, a positive association was observed between daily occupational sedentary hours and WC, WHR, BMI, and with high risk profiles that incorporated both BMI and WC (P < .01). Controlling for vigorous-intensity LTPA in all models strengthened associations between sedentary behavior and measures of obesity. In contrast, inverse associations were observed for occupational sedentary hours and WHR for women (P < .05). In fully employed men, occupational sedentary behavior was positively associated with obesity risk that was not attenuated by physical activity. In women, an increase in obesity risk was not observed with sedentary behavior. Gender differences in the health effects of sedentary behavior require further study.

  19. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project is expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality

  20. Final Project Report: DOE Award FG02-04ER25606 Overlay Transit Networking for Scalable, High Performance Data Communication across Heterogeneous Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Beck, Micah; Moore, Terry

    2007-08-31

    , analogous to those used within computation centers, but designed to operate on a global scale. Building on a basic storage service that is as primitive as possible, such a Global Storage Network would define a framework within which higher level services can be created. If this framework enabled a variety of more specialized middleware and supported a wide array of applications, then interoperability and collaboration could occur based on that common framework. The research in Logistical Networking (LN) carried out under the DOE's SciDAC program tested the value of this approach within the context of several SciDAC application communities. Below we briefly describe the basic design of the LN storage network and some of the results that the Logistical Networking community has achieved.

  1. Susceptibility of the wild-derived inbred CAST/Ei mouse to infection by orthopoxviruses analyzed by live bioluminescence imaging

    International Nuclear Information System (INIS)

    Americo, Jeffrey L.; Sood, Cindy L.; Cotter, Catherine A.; Vogel, Jodi L.; Kristie, Thomas M.; Moss, Bernard; Earl, Patricia L.

    2014-01-01

    Classical inbred mice are extensively used for virus research. However, we recently found that some wild-derived inbred mouse strains are more susceptible than classical strains to monkeypox virus. Experiments described here indicated that the 50% lethal dose of vaccinia virus (VACV) and cowpox virus (CPXV) were two logs lower in wild-derived inbred CAST/Ei mice than classical inbred BALB/c mice, whereas there was little difference in the susceptibility of the mouse strains to herpes simplex virus. Live bioluminescence imaging was used to follow spread of pathogenic and attenuated VACV strains and CPXV virus from nasal passages to organs in the chest and abdomen of CAST/Ei mice. Luminescence increased first in the head and then simultaneously in the chest and abdomen in a dose-dependent manner. The spreading kinetics was more rapid with VACV than CPXV although the peak photon flux was similar. These data suggest advantages of CAST/Ei mice for orthopoxvirus studies. - Highlights: • Wild-derived inbred CAST/Ei mice are susceptible to vaccinia virus and cowpox virus. • Morbidity and mortality from orthopoxviruses are greater in CAST/Ei than BALB/c mice. • Morbidity and mortality from herpes simplex virus type 1 are similar in both mice. • Imaging shows virus spread from nose to lungs, abdominal organs and brain. • Vaccinia virus spreads more rapidly than cowpox virus

  2. Susceptibility of the wild-derived inbred CAST/Ei mouse to infection by orthopoxviruses analyzed by live bioluminescence imaging

    Energy Technology Data Exchange (ETDEWEB)

    Americo, Jeffrey L.; Sood, Cindy L.; Cotter, Catherine A.; Vogel, Jodi L.; Kristie, Thomas M.; Moss, Bernard, E-mail: bmoss@nih.gov; Earl, Patricia L., E-mail: pearl@nih.gov

    2014-01-20

    Classical inbred mice are extensively used for virus research. However, we recently found that some wild-derived inbred mouse strains are more susceptible than classical strains to monkeypox virus. Experiments described here indicated that the 50% lethal dose of vaccinia virus (VACV) and cowpox virus (CPXV) were two logs lower in wild-derived inbred CAST/Ei mice than classical inbred BALB/c mice, whereas there was little difference in the susceptibility of the mouse strains to herpes simplex virus. Live bioluminescence imaging was used to follow spread of pathogenic and attenuated VACV strains and CPXV virus from nasal passages to organs in the chest and abdomen of CAST/Ei mice. Luminescence increased first in the head and then simultaneously in the chest and abdomen in a dose-dependent manner. The spreading kinetics was more rapid with VACV than CPXV although the peak photon flux was similar. These data suggest advantages of CAST/Ei mice for orthopoxvirus studies. - Highlights: • Wild-derived inbred CAST/Ei mice are susceptible to vaccinia virus and cowpox virus. • Morbidity and mortality from orthopoxviruses are greater in CAST/Ei than BALB/c mice. • Morbidity and mortality from herpes simplex virus type 1 are similar in both mice. • Imaging shows virus spread from nose to lungs, abdominal organs and brain. • Vaccinia virus spreads more rapidly than cowpox virus.

  3. Audio-Visual Biofeedback Does Not Improve the Reliability of Target Delineation Using Maximum Intensity Projection in 4-Dimensional Computed Tomography Radiation Therapy Planning

    International Nuclear Information System (INIS)

    Lu, Wei; Neuner, Geoffrey A.; George, Rohini; Wang, Zhendong; Sasor, Sarah; Huang, Xuan; Regine, William F.; Feigenberg, Steven J.; D'Souza, Warren D.

    2014-01-01

    Purpose: To investigate whether coaching patients' breathing would improve the match between ITV MIP (internal target volume generated by contouring in the maximum intensity projection scan) and ITV 10 (generated by combining the gross tumor volumes contoured in 10 phases of a 4-dimensional CT [4DCT] scan). Methods and Materials: Eight patients with a thoracic tumor and 5 patients with an abdominal tumor were included in an institutional review board-approved prospective study. Patients underwent 3 4DCT scans with: (1) free breathing (FB); (2) coaching using audio-visual (AV) biofeedback via the Real-Time Position Management system; and (3) coaching via a spirometer system (Active Breathing Coordinator or ABC). One physician contoured all scans to generate the ITV 10 and ITV MIP . The match between ITV MIP and ITV 10 was quantitatively assessed with volume ratio, centroid distance, root mean squared distance, and overlap/Dice coefficient. We investigated whether coaching (AV or ABC) or uniform expansions (1, 2, 3, or 5 mm) of ITV MIP improved the match. Results: Although both AV and ABC coaching techniques improved frequency reproducibility and ABC improved displacement regularity, neither improved the match between ITV MIP and ITV 10 over FB. On average, ITV MIP underestimated ITV 10 by 19%, 19%, and 21%, with centroid distance of 1.9, 2.3, and 1.7 mm and Dice coefficient of 0.87, 0.86, and 0.88 for FB, AV, and ABC, respectively. Separate analyses indicated a better match for lung cancers or tumors not adjacent to high-intensity tissues. Uniform expansions of ITV MIP did not correct for the mismatch between ITV MIP and ITV 10 . Conclusions: In this pilot study, audio-visual biofeedback did not improve the match between ITV MIP and ITV 10 . In general, ITV MIP should be limited to lung cancers, and modification of ITV MIP in each phase of the 4DCT data set is recommended

  4. Final Report to DOE EERE – Geothermal Technologies Program Project Title: Monitoring and modeling of fluid flow in a developing enhanced geothermal system (EGS) reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Fehler, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-04-19

    The primary objective of this project was to improve our ability to predict performance of an Enhanced Geothermal System (EGS) reservoir over time by relating, in a quantitative manner, microseismic imaging with fluid and temperature changes within the reservoir. Historically, microseismic data have been used qualitatively to place bounds on the growth of EGS reservoirs created by large hydraulic fracturing experiments. Previous investigators used an experimentally based fracture opening relationship (fracture aperture as a function of pressure), the spatial extent of microseismic events, and some assumptions about fracture frequency to determine the size of an EGS reservoir created during large pumping tests. We addressed a number of issues (1) locating microearthquakes that occur during hydraulic fracturing, (2) obtaining more information about a reservoir than the microearthquake locations from the microearthquake data, for example, information about the seismic velocity structure of the reservoir or the scattering of seismic waves within the reservoir, (3) developing an improved methodology for estimating properties of fractures that intersect wellbores in a reservoir, and (4) developing a conceptual model for explaining the downward growth of observed seismicity that accompanies some hydraulic injections into geothermal reservoirs. We used two primary microseismic datasets for our work. The work was motivated by a dataset from the Salak Geothermal Field in Indonesia where seismicity accompanying a hydraulic injection was observed to migrate downward. We also used data from the Soultz EGS site in France. We also used Vertical Seismic Profiling data from a well in the United States. The work conducted is of benefit for characterizing reservoirs that are created by hydraulic fracturing for both EGS and for petroleum recovery.

  5. What does the literature tell us about health workers' experiences of task-shifting projects in sub-Saharan Africa? A systematic, qualitative review.

    Science.gov (United States)

    Mijovic, Hana; McKnight, Jacob; English, Mike

    2016-08-01

    To review systematically, qualitative literature covering the implementation of task shifting in sub-Saharan Africa to address the growing interest in interventions of this kind. This review aims to distil the key practical findings to both guide a specific project aiming to improve the quality of neonatal care in Kenya and to contribute to the broader literature. Task-shifting programmes aim to improve access to healthcare by delegating specific tasks from higher to lower skilled health workers. Evidence suggests that task-shifting programmes in sub-Saharan Africa may improve patient outcomes, but they have also been criticised for providing fragmented, unsustainable services. This systematic review of qualitative literature summarises factors affecting implementation of task shifting and how such interventions in sub-Saharan Africa may have affected health workers' feelings about their own positions and their ability to provide care. Following literature search, a modified Critical Appraisal Skills Program (CASP) framework was used to assess quality. Thereafter, analysis adopted a thematic synthesis approach. A systematic literature search identified qualitative studies examining task -shifting interventions in sub-Saharan Africa. Thematic synthesis was used to identify overarching themes arising from across the studies and infer how task-shifting interventions may impact on the health workers from whom tasks are being shifted. From the 230 studies screened, 13 met the inclusion criteria. Overarching themes identified showed that task shifting has been associated with jurisdictional debates linked to new cadres working beyond their scope of practice, and tension around compensation and career development for those taking on tasks that were being delegated. Based on the qualitative data available, it appears that task shifting may negatively impact the sense of agency and the ability to perform of health workers' from whom tasks are shifted. The potential

  6. Sensitivity of GC-EI/MS, GC-EI/MS/MS, LC-ESI/MS/MS, LC-Ag(+) CIS/MS/MS, and GC-ESI/MS/MS for analysis of anabolic steroids in doping control.

    Science.gov (United States)

    Cha, Eunju; Kim, Sohee; Kim, Ho Jun; Lee, Kang Mi; Kim, Ki Hun; Kwon, Oh-Seung; Lee, Jaeick

    2015-01-01

    This study compared the sensitivity of various separation and ionization methods, including gas chromatography with an electron ionization source (GC-EI), liquid chromatography with an electrospray ionization source (LC-ESI), and liquid chromatography with a silver ion coordination ion spray source (LC-Ag(+) CIS), coupled to a mass spectrometer (MS) for steroid analysis. Chromatographic conditions, mass spectrometric transitions, and ion source parameters were optimized. The majority of steroids in GC-EI/MS/MS and LC-Ag(+) CIS/MS/MS analysis showed higher sensitivities than those obtained with other analytical methods. The limits of detection (LODs) of 65 steroids by GC-EI/MS/MS, 68 steroids by LC-Ag(+) CIS/MS/MS, 56 steroids by GC-EI/MS, 54 steroids by LC-ESI/MS/MS, and 27 steroids by GC-ESI/MS/MS were below cut-off value of 2.0 ng/mL. LODs of steroids that formed protonated ions in LC-ESI/MS/MS analysis were all lower than the cut-off value. Several steroids such as unconjugated C3-hydroxyl with C17-hydroxyl structure showed higher sensitivities in GC-EI/MS/MS analysis relative to those obtained using the LC-based methods. The steroids containing 4, 9, 11-triene structures showed relatively poor sensitivities in GC-EI/MS and GC-ESI/MS/MS analysis. The results of this study provide information that may be useful for selecting suitable analytical methods for confirmatory analysis of steroids. Copyright © 2015 John Wiley & Sons, Ltd.

  7. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  8. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  9. Audio-Visual Biofeedback Does Not Improve the Reliability of Target Delineation Using Maximum Intensity Projection in 4-Dimensional Computed Tomography Radiation Therapy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Wei, E-mail: wlu@umm.edu [Department of Radiation Oncology, University of Maryland School of Medicine, Baltimore, Maryland (United States); Neuner, Geoffrey A.; George, Rohini; Wang, Zhendong; Sasor, Sarah [Department of Radiation Oncology, University of Maryland School of Medicine, Baltimore, Maryland (United States); Huang, Xuan [Research and Development, Care Management Department, Johns Hopkins HealthCare LLC, Glen Burnie, Maryland (United States); Regine, William F.; Feigenberg, Steven J.; D' Souza, Warren D. [Department of Radiation Oncology, University of Maryland School of Medicine, Baltimore, Maryland (United States)

    2014-01-01

    Purpose: To investigate whether coaching patients' breathing would improve the match between ITV{sub MIP} (internal target volume generated by contouring in the maximum intensity projection scan) and ITV{sub 10} (generated by combining the gross tumor volumes contoured in 10 phases of a 4-dimensional CT [4DCT] scan). Methods and Materials: Eight patients with a thoracic tumor and 5 patients with an abdominal tumor were included in an institutional review board-approved prospective study. Patients underwent 3 4DCT scans with: (1) free breathing (FB); (2) coaching using audio-visual (AV) biofeedback via the Real-Time Position Management system; and (3) coaching via a spirometer system (Active Breathing Coordinator or ABC). One physician contoured all scans to generate the ITV{sub 10} and ITV{sub MIP}. The match between ITV{sub MIP} and ITV{sub 10} was quantitatively assessed with volume ratio, centroid distance, root mean squared distance, and overlap/Dice coefficient. We investigated whether coaching (AV or ABC) or uniform expansions (1, 2, 3, or 5 mm) of ITV{sub MIP} improved the match. Results: Although both AV and ABC coaching techniques improved frequency reproducibility and ABC improved displacement regularity, neither improved the match between ITV{sub MIP} and ITV{sub 10} over FB. On average, ITV{sub MIP} underestimated ITV{sub 10} by 19%, 19%, and 21%, with centroid distance of 1.9, 2.3, and 1.7 mm and Dice coefficient of 0.87, 0.86, and 0.88 for FB, AV, and ABC, respectively. Separate analyses indicated a better match for lung cancers or tumors not adjacent to high-intensity tissues. Uniform expansions of ITV{sub MIP} did not correct for the mismatch between ITV{sub MIP} and ITV{sub 10}. Conclusions: In this pilot study, audio-visual biofeedback did not improve the match between ITV{sub MIP} and ITV{sub 10}. In general, ITV{sub MIP} should be limited to lung cancers, and modification of ITV{sub MIP} in each phase of the 4DCT data set is recommended.

  10. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  11. Computer-aided engineering for Qinshan CANDU projects

    International Nuclear Information System (INIS)

    Huang Zhizhang; Goland, D.

    1999-01-01

    The author briefly describes AECL's work in applying computer-aided engineering tools to the Qinshan CANDU Project. The main emphases will be to introduce the major CADD software tools and their use in civil design, process design and EI and C design. Other special software tools and non-CADD tools and their applications are also briefly introduced

  12. The EIS (Environmental Impact Statement) Process in Relation to the Proposed Naval Task Force at Everett, Washington,

    Science.gov (United States)

    1983-01-01

    decision before filing the EA. Also, the transfer of fuel and arms and the change in economic and social enviromental effects warranted an EIS. Facts: The...must deal with many of the same environmental, social , and economic problems that are evident. The basing of a Naval Task Force in Puget Sound stems from...which involves unresolved conflicts e. V.V..4 President OMB Cirua * NEPA of 1969 (42 U.S.C. 4321) CEQ/EIS Guidelines 40 CFR 1500-1508 . 7 Excuiv Ordc

  13. CDW-EIS model for single-electron capture in ion-atom collisions involving multielectronic targets

    International Nuclear Information System (INIS)

    Abufager, P N; MartInez, A E; Rivarola, R D; Fainstein, P D

    2004-01-01

    A generalization of the continuum distorted wave eikonal initial state (CDW-EIS) approximation, for the description of single-electron capture in ion-atom collisions involving multielectronic targets is presented. This approximation is developed within the framework of the independent electron model taking particular care of the representation of the bound and continuum target states. Total cross sections for single-electron capture from the K-shell of He, Ne and Ar noble gases by impact of bare ions are calculated. Present results are compared to previous CDW-EIS ones and to experimental data

  14. Czech returns to schooling: does the short supply of college education bite?

    Czech Academy of Sciences Publication Activity Database

    Jurajda, Štěpán

    -, č. 213 (2003), s. 1-14 ISSN 1211-3298 R&D Projects: GA AV ČR KSK8002119; GA ČR GA403/03/0340 Institutional research plan: CEZ:AV0Z7085904 Keywords : returns to education * Czech Republic Subject RIV: AH - Economics http://www.cerge-ei.cz/pdf/wp/Wp213.pdf

  15. AN IMPLEMENTATION OF EIS-SVM CLASSIFIER USING RESEARCH ARTICLES FOR TEXT CLASSIFICATION

    Directory of Open Access Journals (Sweden)

    B Ramesh

    2016-04-01

    Full Text Available Automatic text classification is a prominent research topic in text mining. The text pre-processing is a major role in text classifier. The efficiency of pre-processing techniques is increasing the performance of text classifier. In this paper, we are implementing ECAS stemmer, Efficient Instance Selection and Pre-computed Kernel Support Vector Machine for text classification using recent research articles. We are using better pre-processing techniques such as ECAS stemmer to find root word, Efficient Instance Selection for dimensionality reduction of text data and Pre-computed Kernel Support Vector Machine for classification of selected instances. In this experiments were performed on 750 research articles with three classes such as engineering article, medical articles and educational articles. The EIS-SVM classifier provides better performance in real-time research articles classification.

  16. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Science.gov (United States)

    2013-07-26

    ...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...) Ocotillo Sol Solar Project in Imperial County, California, and by this notice is announcing its... Ocotillo Sol Solar Project Final EIS/Proposed CDCA Plan Amendment have been sent to affected Federal, State...

  17. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Science.gov (United States)

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  18. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  19. Navajo Electrification Demonstraiton Project

    Energy Technology Data Exchange (ETDEWEB)

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  20. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  1. 76 FR 46721 - Salmon-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project...

    Science.gov (United States)

    2011-08-03

    ...-Challis National Forest, ID; Upper North Fork HFRA Ecosystem Restoration Project Environmental Impact... improve the health of the ecosystem and reach the desired future condition. DATES: Comments concerning the... Ecosystem Restoration Project EIS, P.O. Box 180, 11 Casey Rd., North Fork, ID 83466. Comments may also be...

  2. Kas nad tõesti ei tea, mida räägivad? / Jüri Ginter

    Index Scriptorium Estoniae

    Ginter, Jüri, 1954-

    2009-01-01

    2009. a. sügisest kehtima hakkava põhikooli- ja gümnaasiumiseaduse § 28 sätestab, et vastuvõtt gümnaasiumi toimub põhikooli lõpetamise tulemuste alusel. Samas seaduses ei ole öeldud, et lähtuma peab keskmisest hindest, aastahinnetest vms

  3. Eesmärk ei pühenda iga abinõu. Eetiline investor tunneb vastutust / Kadri Bank

    Index Scriptorium Estoniae

    Bank, Kadri

    2011-01-01

    ÜRO vastutustundliku investeerimise programmiga liitunud Limestone Fundsi investeerimispõhimõte on mitte finantseerida ettevõtteid, kelle tegevus on ühiskonna jätkusuutliku arenguga vastuolus. Selle juht Alvar Roosimaa ei näe n.-ö. tavalise ja eetilise investeeringu pikkuse ja kasumlikkuse juures mingit erinevust

  4. Electrochemical impedance spectroscopy (EIS) as a tool for measuring corrosion of polymer-coated fasteners used in treated wood

    Science.gov (United States)

    Samuel L. Zelinka; Lorraine Ortiz-Candelaria; Donald S. Stone; Douglas R. Rammer

    2009-01-01

    Currently, many of the polymer-coated fasteners on the market are designed for improved corrosion performance in treated wood; yet, there is no way to evaluate their corrosion performance. In this study, a common technique for measuring the corrosion performance of polymer-coated metals, electrochemical impedance spectroscopy (EIS), was used to evaluate commercial...

  5. Kuidas saab Tallinna Vee brittidelt tagasi osta, kui nad ei taha müüa? / Andres Reimer

    Index Scriptorium Estoniae

    Reimer, Andres

    2009-01-01

    Autori sõnul peavad tõsiselt võetavad analüütikud ja arvamusliidrid Tallinna Vee aktsiate linnale ostmist majanduslikult põhjendamata sammuks, mis tooks kaasa suure laenukoorma, mille lõpuks maksavad kinni tallinlased. Asjatundjate hinnangul ei paista Tallinna Vee omanikel olevat ühtegi põhjust, miks nad tahaksid firma aktsiaid müüa

  6. 76 FR 53705 - Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement (EIS), Ada...

    Science.gov (United States)

    2011-08-29

    ... new concept are not significant and do not warrant an EIS. Recommendations for improvements along this... with several concepts derived from previous planning efforts. Then a wide range of route options were...) technology such as closed caption television cameras, speed detectors, and other hardware and software...

  7. 78 FR 4134 - Notice of Intent To Prepare An Environmental Impact Statement (EIS) On the Proposal To Relocate...

    Science.gov (United States)

    2013-01-18

    ... Proposal To Relocate the 18th Aggressor Squadron From Eielson Air Force Base (EAFB), Alaska to Joint Base... Eielson AFB, AK AGENCY: Pacific Air Forces, United States Air Force, DOD. ACTION: Notice of Intent... Statement (EIS) considering a proposal to relocate the 18th Aggressor Squadron from Eielson AFB to Joint...

  8. Venemaa ei tahtnud G8-le läinud Eesti ajakirjanikke üle piiri lasta / Krister Paris

    Index Scriptorium Estoniae

    Paris, Krister, 1977-

    2006-01-01

    Vene piirivalve hoidis Ivangorodis mitu tundi kinni G-8 tippkohtumisele akrediteeringu saanud kolme Eesti ajakirjanikku. Vt. samas: Venemaa WTO-sse veel ei saa, trump on tuumaenergial; Tanel Mazur. Globaliseerumisvastased saadeti pärast vangistust tagasi Eestisse. Lisad: Meelt jõuti avaldada vaid kaks minutit; Lukashenko vastased kiirelt türmi

  9. Blocking epithelial-to-mesenchymal transition in glioblastoma with a sextet of repurposed drugs: the EIS regimen.

    Science.gov (United States)

    Kast, Richard E; Skuli, Nicolas; Karpel-Massler, Georg; Frosina, Guido; Ryken, Timothy; Halatsch, Marc-Eric

    2017-09-22

    This paper outlines a treatment protocol to run alongside of standard current treatment of glioblastoma- resection, temozolomide and radiation. The epithelial to mesenchymal transition (EMT) inhibiting sextet, EIS Regimen, uses the ancillary attributes of six older medicines to impede EMT during glioblastoma. EMT is an actively motile, therapy-resisting, low proliferation, transient state that is an integral feature of cancers' lethality generally and of glioblastoma specifically. It is believed to be during the EMT state that glioblastoma's centrifugal migration occurs. EMT is also a feature of untreated glioblastoma but is enhanced by chemotherapy, by radiation and by surgical trauma. EIS Regimen uses the antifungal drug itraconazole to block Hedgehog signaling, the antidiabetes drug metformin to block AMP kinase (AMPK), the analgesic drug naproxen to block Rac1, the anti-fibrosis drug pirfenidone to block transforming growth factor-beta (TGF-beta), the psychiatric drug quetiapine to block receptor activator NFkB ligand (RANKL) and the antibiotic rifampin to block Wnt- all by their previously established ancillary attributes. All these systems have been identified as triggers of EMT and worthy targets to inhibit. The EIS Regimen drugs have a good safety profile when used individually. They are not expected to have any new side effects when combined. Further studies of the EIS Regimen are needed.

  10. Läti riik ei suuda IMF-i nõuet mingi hinnaga täita / Kaivo Kopli

    Index Scriptorium Estoniae

    Kopli, Kaivo

    2009-01-01

    Isegi ametiasutuste palkade ja kulude vähendamisel 40% võrra ei suudaks Läti järgida viieprotsendise puudujäägi nõuet, mille täitmise korral on IMF valmis andma edasisi laene. Valitsuse siht on jõuda sel aastal seitsmeprotsendise defitsiidini

  11. PV Interneurons: Critical Regulators of E/I Balance for Prefrontal Cortex-Dependent Behavior and Psychiatric Disorders

    Directory of Open Access Journals (Sweden)

    Brielle R. Ferguson

    2018-05-01

    Full Text Available Elucidating the prefrontal cortical microcircuit has been challenging, given its role in multiple complex behaviors, including working memory, cognitive flexibility, attention, social interaction and emotional regulation. Additionally, previous methodological limitations made it difficult to parse out the contribution of certain neuronal subpopulations in refining cortical representations. However, growing evidence supports a fundamental role of fast-spiking parvalbumin (PV GABAergic interneurons in regulating pyramidal neuron activity to drive appropriate behavioral responses. Further, their function is heavily diminished in the prefrontal cortex (PFC in numerous psychiatric diseases, including schizophrenia and autism. Previous research has demonstrated the importance of the optimal balance of excitation and inhibition (E/I in cortical circuits in maintaining the efficiency of cortical information processing. Although we are still unraveling the mechanisms of information representation in the PFC, the E/I balance seems to be crucial, as pharmacological, chemogenetic and optogenetic approaches for disrupting E/I balance induce impairments in a range of PFC-dependent behaviors. In this review, we will explore two key hypotheses. First, PV interneurons are powerful regulators of E/I balance in the PFC, and help optimize the representation and processing of supramodal information in PFC. Second, diminishing the function of PV interneurons is sufficient to generate an elaborate symptom sequelae corresponding to those observed in a range of psychiatric diseases. Then, using this framework, we will speculate on whether this circuitry could represent a platform for the development of therapeutic interventions in disorders of PFC function.

  12. Flawlessi tankeriga sõitnud Küprose firma ei võta merereostuse tekitamist omaks / Martin Hanson

    Index Scriptorium Estoniae

    Hanson, Martin, 1984-

    2006-01-01

    Flawlessi tankeriga opereerivat Küprose firmat Hanseatic Shipping ei saa reostuses süüdistada, sest nemad vedasid rasket kütteõli, kuid Lääne-Eesti rannikult leiti pooltahke õlimass. Vt. samas: Piret Reiljan. Alambra reostuse puhul jäi Eestil trahv saamata; Prokuratuuril sadu kahtlusaluseid

  13. Project Report on DOE Young Investigator Grant (Contract No. DE-FG02-02ER25525) Dynamic Scheduling and Fusion of Irregular Computation (August 15, 2002 to August 14, 2005)

    Energy Technology Data Exchange (ETDEWEB)

    Ding, Chen

    2005-08-16

    may use an enormous number of data elements. To optimize the layout across multiple arrays, we have developed a formal model called reference afï¬ nity. We collaborated with the IBM production compiler group and designed an efï¬ cient compiler analysis that performs as well as data or code proï¬ ling does. Based on these results, the IBM group has ï¬ led a patent and is including this technique in their product compiler. A major part of the project is the development of software tools. We have developed web-based visu- alization for program locality. In addition, we have implemented a prototype of array regrouping in the IBM compiler. The full implementation is expected to come out of IBM in the near future and to beneï¬ t scientiï¬ c applications running on IBM supercomputers. We have also developed a test environment for studying the limit of computation fusion. Finally, our work has directly influenced the design of the Intel Itanium compiler. The project has strengthened the research relation between the PI's group and groups in DoE labs. The PI was an invited speaker at the Center for Applied Scientiï¬ c Computing Seminar Series at the early stage of the project. The question that the most audience was curious about was the limit of computation fusion, which has been studied in depth in this research. In addition, the seminar directly helped a group at Lawrence Livermore to achieve four times speedup on an important DoE code. The PI helped to organize a number of high-performance computing forums, including the founding of a workshop on memory system performance (MSP). In the past two years, one fourth of the papers in the workshop came from researchers in Lawrence Livermore, Argonne, Las Alamos, and Lawrence Berkeley national laboratories. The PI lectured frequently on DoE funded research. In a broader context, high performance computing is central to America's scientific and economic stature in the world, and addresses many of the most

  14. Does Student Nationality Affect Their Project Writing?

    DEFF Research Database (Denmark)

    Moini, Hamid; Turcan, Romeo V.; Gulieva, Valeria

    was performed in an attempt to distinguish between the two groups of students in terms of multiple characteristics. Overall, it emerges that the variety of quantitative sampling, gender, and the research methodology are the key factors discriminating between the two groups of students....... the Department of Business and Management. A two-stage data analysis was performed. In the first stage, data was analyzed using a one-way analysis of variance. This sheds light on the students’ decision to write a thesis in order to complete their program. In the second stage, a step-wise discriminant analysis...

  15. Does malaria epidemiology project Cameroon as

    Indian Academy of Sciences (India)

    2014-07-16

    Jul 16, 2014 ... migration from the rural to urban areas as well as population exchange with adjoining countries, high ... cultural practices, deforestation, etc., have also resulted in ..... (Cameroon): influence of urban agriculture and pollution.

  16. McCullough to Liberty fiber optics project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ``McCullough to Liberty Fiber Optics Project`` (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI).

  17. McCullough to Liberty fiber optics project

    International Nuclear Information System (INIS)

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ''McCullough to Liberty Fiber Optics Project'' (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI)

  18. Chromospheric Evaporation in an M1.8 Flare Observed by the Extreme-ultraviolet Imaging Spectrometer (EIS) on Hinode

    Science.gov (United States)

    Doschek, G. A.; Warren, H. P.

    2012-12-01

    We discuss observations of chromospheric evaporation for a flare that occurred on 9 March 2012 near 03:30 UT obtained from the Extreme-ultraviolet Imaging Spectrometer (EIS) on the Hinode spacecraft. This was a multiple event with a strong energy input that reached the M1.8 class when observed by EIS. EIS was in raster mode and fortunately the slit reached almost the exact location of a significant energy input. Also, fortunately EIS obtained a full-CCD spectrum of the flare, i.e., the entire CCD was readout so that data were obtained for about the 500 lines identified in the EIS wavelength ranges. Chromospheric evaporation characterized by 150-200 km/s upflows was observed in several locations in multi-million degree spectral lines of flare ions such as Fe XXII, Fe XXIII, Fe XXIV, with simultaneous 20 - 60 km/s upflows in a host of million degree coronal lines from ions such as Fe XI - Fe XVI. The behavior of cooler, transition region ions such as O VI, Fe VIII, He II, and Fe X is more complex. At a point close to strong energy input, the flare ions reveal an isothermal source with a temperature close to 14 MK. At this point there is a strong downflow in cooler active region lines from ions such as Fe XIII and Fe XIV. Electron densities were obtained from density sensitive lines ratios from Fe XIII and Fe XIV. The results to be presented are refined from the preliminary data given above and combined with context AIA observations for a comparison with predictions of models of chromospheric evaporation as envisaged in the Standard Flare Model.

  19. CON4EI: EpiOcular™ Eye Irritation Test (EpiOcular™ EIT) for hazard identification and labelling of eye irritating chemicals.

    Science.gov (United States)

    Kandarova, H; Letasiova, S; Adriaens, E; Guest, R; Willoughby, J A; Drzewiecka, A; Gruszka, K; Alépée, Nathalie; Verstraelen, Sandra; Van Rompay, An R

    2018-06-01

    Assessment of the acute eye irritation potential is part of the international regulatory requirements for testing of chemicals. The objective of the CON4EI project was to develop tiered testing strategies for eye irritation assessment. A set of 80 reference chemicals (38 liquids and 42 solids) was tested with eight different methods. Here, the results obtained with the EpiOcular™ Eye Irritation Test (EIT), adopted as OECD TG 492, are shown. The primary aim of this study was to evaluate of the performance of the test method to discriminate between chemicals not requiring classification for serious eye damage/eye irritancy (No Category) and chemicals requiring classification and labelling. In addition, the predictive capacity in terms of in vivo drivers of classification (i.e. corneal opacity, conjunctival redness and persistence at day 21) was investigated. EpiOcular™ EIT achieved a sensitivity of 97%, a specificity of 87% and accuracy of 95% and also confirmed its excellent reproducibility (100%) from the original validation. The assay was applicable to all chemical categories tested in this project and its performance was not limited to the particular driver of the classification. In addition to the existing prediction model for dichotomous categorization, a new prediction model for Cat 1 is suggested. Copyright © 2017. Published by Elsevier Ltd.

  20. Interaction of cysteine and copper ions on the surface of iron: EIS, polarization and XPS study

    International Nuclear Information System (INIS)

    El-Deab, Mohamed S.

    2011-01-01

    Highlights: → The current study demonstrates a comprehensive study for Cysteine + Cu(II) ions as an efficient inhibitor as demonstrated by EIS, XPS and potentiodynamic polarization measurements, in addition to traditional weight loss measurements. → The novelty of the current work originates from the combined use of an eco-friendly compound (i.e., cysteine) with a minute amount of copper ions (in the micro molar range) as a corrosion inhibitor for low carbon steel in acidic medium. To this end, cysteine shows only moderate inhibition ca. 60% for iron which jumps up to more than 95% in the presence of micro molar range of Cu(II) ions. → Cysteine-Cu(II) blends are found superior to benzotriazole (BTAH)-Cu(II) blends in terms of their long-term stability in addition to the avoidance of the use of the well-reported highly toxic BTAH. - Abstract: This study addresses the enhancing effect of copper ions on the inhibition efficiency (IE) of cysteine (an eco-friendly compound) against the corrosion of iron in 0.5 M sulphuric acid. Electrochemical impedance spectroscopy (EIS) data revealed a significant increase in the polarization resistance (R p ) of the iron/solution interface in the presence of cysteine and Cu(II) ions instead of cysteine alone. That is, IE of 95% is obtained in the presence of 5 mM cysteine and 25 μM Cu(II) ions, compared to 66% in absence of Cu(II) ions. Moreover, electrochemical polarization measurements indicate that cysteine and Cu(II) ions blends act as mixed-type inhibitors for the corrosion of iron. The formation of Cu(I)-cysteinate complex and/or cysteine SAM at Cu atop the iron surface (as evident from X-ray photoelectron spectroscopy (XPS)) blocks the underlying iron surface and imparts a pronounced protection against its corrosion. IE of cysteine-Cu(II) blend remains effectively unchanged with immersion time indicating its high stability in the used acidic medium.

  1. Evaluarea performanţei heterozis la analogii MRf ai liniilor consangvinizate de porumb

    Directory of Open Access Journals (Sweden)

    PARTAS Eugenia

    2015-12-01

    Full Text Available The paper presents the multiannual results obtained from the evaluation of heterosis performance of MRf analogs in expression of 16 morphological and agronomic traits. The results revealed that the hybrids with MRf pollinators in comparison with the original version present a richer tassel in lateral branches and significantly lower values for 9 out of 15 evaluated traits, especially in the expression of plant length, length of ear, number of grains per rowand tassel peduncle length. The backcrossed fertile plants in MRf analog contributed to the differentiation of descendants in terms of heterosis performance of grain yield in the evaluated 2-4 consecutive generations, but the selection of MRf descendants with significant higher values did not contribute to the improvement of the analog in this respect. Rezumat. În lucrare sunt prezentate rezultatele multianuale obţinute la evaluarea performanţei heterozis a analogilor MRf la expresia a 16 indici morfologici şi agronomici. Rezultatele obţinute denotă că hibrizii cu polenizatori MRf se prezintă cu panicul mai bogat în ramificaţii laterale în comparaţie cu varianta originală a hibridului şi cu valori semnificativ mai mici la expresia a 9 din 15 caracteristici evaluate, mai ales la expresia taliei plantelor, lungimea ştiuletelui, numărul de boabe pe rând şi lungimea pedunculului la panicul. Retroîncrucişarea plantelor fertile în analogul MRf a contribuit la diferenţierea descendenţelor din punct de vedere al performanţei heterozis la producţia de boabe în 2-4 generaţii consecutive de evaluare, iar selecţia descendenţelor Rf cu valori superioare originalei nu a contribuit la îmbunătăţirea analogului în acest sens.

  2. ACCELERATING WAVES IN POLAR CORONAL HOLES AS SEEN BY EIS AND SUMER

    International Nuclear Information System (INIS)

    Gupta, G. R.; Banerjee, D.; Teriaca, L.; Solanki, S.; Imada, S.

    2010-01-01

    We present EIS/Hinode and SUMER/SOHO observations of propagating disturbances detected in coronal lines in inter-plume and plume regions of a polar coronal hole. The observation was carried out on 2007 November 13 as part of the JOP196/HOP045 program. The SUMER spectroscopic observation gives information about fluctuations in radiance and on both resolved (Doppler shift) and unresolved (Doppler width) line-of-sight velocities, whereas EIS 40'' wide slot images detect fluctuations only in radiance but maximize the probability of overlapping field of view between the two instruments. From distance-time radiance maps, we detect the presence of propagating waves in a polar inter-plume region with a period of 15-20 minutes and a propagation speed increasing from 130 ± 14 km s -1 just above the limb to 330 ± 140 km s -1 around 160'' above the limb. These waves can be traced to originate from a bright region of the on-disk part of the coronal hole where the propagation speed is in the range of 25 ± 1.3 to 38 ± 4.5 km s -1 , with the same periodicity. These on-disk bright regions can be visualized as the base of the coronal funnels. The adjacent plume region also shows the presence of propagating disturbances with the same range of periodicity but with propagation speeds in the range of 135 ± 18 to 165 ± 43 km s -1 only. A comparison between the distance-time radiance map of the two regions indicates that the waves within the plumes are not observable (may be getting dissipated) far off-limb, whereas this is not the case in the inter-plume region. A correlation analysis was also performed to find out the time delay between the oscillations at several heights in the off-limb region, finding results consistent with those from the analysis of the distance-time maps. To our knowledge, this result provides first spectroscopic evidence of the acceleration of propagating disturbances in the polar region close to the Sun (within 1.2 R/R sun ), which provides clues to the

  3. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  4. Supplement analysis for a container system for the management of DOE spent nuclear fuel located at the INEEL

    International Nuclear Information System (INIS)

    1999-01-01

    The Council on Environmental Quality (CEQ) regulations for implementing the NEPA, 40 CFR 1502.9 (c), directs federal agencies to prepare a supplement to an environmental impact statement when an agency makes substantial changes in the Proposed Action that are relevant to environmental concerns, or there are significant new circumstances or information relevant to environmental concerns and bearing on the Proposed Action or impacts. When it is unclear whether a supplemental environmental impact statement is required, DOE regulations (10 CFR 1021.314) direct the preparation of a supplement analysis to assist in making that determination. This supplement analysis evaluates the impacts of employing dual-purpose canisters (DPCs) to prepare DOE SNF located at the INEEL for interim onsite storage and transport outside the State of Idaho. Impacts associated with DPC manufacturing, loading and storage of DOE-ID SNF into DPCs, transport of loaded DPCs outside Idaho, and the cumulative impacts are compared with the impacts previously analyzed in the SNF and INEL EIS and the Navy Container System EIS. This SA provides information to determine whether: (1) an existing EIS should be supplemented; (2) a new EIS should be prepared; or (3) no further NEPA documentation is required

  5. Supplement analysis for a container system for the management of DOE spent nuclear fuel located at the INEEL

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-12

    The Council on Environmental Quality (CEQ) regulations for implementing the NEPA, 40 CFR 1502.9 (c), directs federal agencies to prepare a supplement to an environmental impact statement when an agency makes substantial changes in the Proposed Action that are relevant to environmental concerns, or there are significant new circumstances or information relevant to environmental concerns and bearing on the Proposed Action or impacts. When it is unclear whether a supplemental environmental impact statement is required, DOE regulations (10 CFR 1021.314) direct the preparation of a supplement analysis to assist in making that determination. This supplement analysis evaluates the impacts of employing dual-purpose canisters (DPCs) to prepare DOE SNF located at the INEEL for interim onsite storage and transport outside the State of Idaho. Impacts associated with DPC manufacturing, loading and storage of DOE-ID SNF into DPCs, transport of loaded DPCs outside Idaho, and the cumulative impacts are compared with the impacts previously analyzed in the SNF and INEL EIS and the Navy Container System EIS. This SA provides information to determine whether: (1) an existing EIS should be supplemented; (2) a new EIS should be prepared; or (3) no further NEPA documentation is required.

  6. Evaluation of accelerated aging procedures of painted galvanised steels by EIS

    Energy Technology Data Exchange (ETDEWEB)

    Fedrizzi, L. [Department of Chemical Science and Technology, University of Udine, Via Cotonificio 108, 33100 Udine (Italy)]. E-mail: lorenzo.fedrizzi@uniud.it; Bergo, A. [Department of ICMMPM, University of Rome ' La Sapienza' , Via Eudossiana 18, 00184 Rome (Italy); Fanicchia, M. [Department of ICMMPM, University of Rome ' La Sapienza' , Via Eudossiana 18, 00184 Rome (Italy)

    2006-01-20

    Coil-coated sheets are usually cut and shaped or deep drawn to obtain the final profile of the manufacture. Mechanical deformation can affect the barrier properties of an organic coating and the adhesion to the substrate, thus accelerating degradation by natural weathering. UV radiations too can deeply affect the barrier properties of organic coatings and contribute along with rain, snow, thermal and hygrometric cycles and other factors to a fast decaying of the anticorrosive properties of painted systems. In this work some coil coating products for outdoor exposure, were subjected to the combined action of UV irradiation and mechanical deformation in order to simulate some of the stress occurring in their actual use. After mechanical deformation and UV irradiation, samples were exposed to a proper thermal cycle in order to accelerate water uptake and to discriminate in very short time among different formulations. Electrochemical impedance spectroscopy (EIS) was used to monitor the evolution of the systems during the accelerated aging. Qc and Rp (i.e. the constant phase element describing the dielectric properties and the ionic resistance of the coating) were selected to describe the protective system evolution. Adhesive and barrier properties were monitored and discussed during the combined thermal-mechanical and photo-oxidative aging.

  7. Electrochemical Polishing Applications and EIS of a Vitamin B4-Based Ionic Liquid

    International Nuclear Information System (INIS)

    Wixtrom, Alex I.; Buhler, Jessica E.; Reece, Charles E.; Abdel-Fattah, Tarek M.

    2013-01-01

    Modern particle accelerators require minimal interior surface roughness for Niobium superconducting radio frequency (SRF) cavities. Polishing of the Nb is currently achieved via electrochemical polishing with concentrated mixtures of sulfuric and hydrofluoric acids. This acid-based approach is effective at reducing the surface roughness to acceptable levels for SRF use, but due to acid-related hazards and extra costs (including safe disposal of used polishing solutions), an acid-free method would be preferable. This study focuses on an alternative electrochemical polishing method for Nb, using a novel ionic liquid solution containing choline chloride, also known as Vitamin B 4 (VB 4 ). Potentiostatic electrochemical impedance spectroscopy (EIS) was also performed on the VB4-based system. Nb polished using the VB4-based method was found to have a final surface roughness comparable to that achieved via the acid-based method, as assessed by atomic force microscopy (AFM). These findings indicate that acid-free VB 4 -based electrochemical polishing of Nb represents a promising replacement for acid-based methods of SRF cavity preparation

  8. EIS and potentiodynamic polarization studies on immiscible monotectic Al–In alloys

    International Nuclear Information System (INIS)

    Osório, Wislei R.; Freitas, Emmanuelle S.; Garcia, Amauri

    2013-01-01

    Highlights: • The Al–In alloy microstructure is characterized by In droplets spread in an Al matrix. • The scale of phases forming the microstructure affect the electrochemical behavior. • Larger interphase spacing/droplet diameter is related to higher corrosion resistance. • The deleterious effect in corrosion resistance is due to strains and galvanic cells. -- Abstract: The electrochemical behavior of monotectic Al–In alloys is experimentally investigated. Electrochemical impedance spectroscopy (EIS), potentiodynamic anodic polarization techniques and an equivalent circuit analysis were used to evaluate the corrosion response in a stagnant and naturally aerated 0.5 M NaCl solution at 25 °C. It was found that a better galvanic protection can be provided for microstructures having indium droplets of larger diameters and larger interphase spacings. From five samples extracted along the length of a directionally solidified Al–In casting, that having smallest interphase spacing (λ = 18 μm) and droplet diameter (d = 0.7 μm) had its corrosion resistance significantly decreased (about 2 and 3 times in terms of the current density and polarization resistance) when compared with that of the sample having the coarsest microstructure (λ = 60 μm and d = 2.5 μm). Such behavior is attributed to both localized strains between aluminum and indium boundaries and the corrosion potential of the indium particles

  9. An assessment of the water management program proposed in the Ranger EIS and its environmental implications

    International Nuclear Information System (INIS)

    Davy, D.R.

    1976-01-01

    An assessment of the water management program proposed in the Ranger EIS has three components: a) a statement of water quality criteria and standards that the program must meet, b) a set of calculations based on the best available estimates, that compares the expected levels of waste with the standards set for the release, c) the plan of the surveillance program aimed at demonstrating compliance with these standards and at revealing deficiencies in the choice of criteria, the derivation of standards from them and unforseen departures from expectation. Standards are suggested for the operation of the Ranger mines based on the most restrictive criterion out of: (i) acute toxicity tests carried out on organisms and water from the Magela Creek combined with application factors recommended by AWRC, (ii) the results on indicator species and biological diversity indices for the Finniss river, (iii) requirements for agricultural and pastoral use, (iv) the requirements for portable water. It is expected that the program proposed by Ranger will meet these standards and it is concluded that planning for a comprehensive environmental program is adequate. (author)

  10. Evaluation of accelerated aging procedures of painted galvanised steels by EIS

    International Nuclear Information System (INIS)

    Fedrizzi, L.; Bergo, A.; Fanicchia, M.

    2006-01-01

    Coil-coated sheets are usually cut and shaped or deep drawn to obtain the final profile of the manufacture. Mechanical deformation can affect the barrier properties of an organic coating and the adhesion to the substrate, thus accelerating degradation by natural weathering. UV radiations too can deeply affect the barrier properties of organic coatings and contribute along with rain, snow, thermal and hygrometric cycles and other factors to a fast decaying of the anticorrosive properties of painted systems. In this work some coil coating products for outdoor exposure, were subjected to the combined action of UV irradiation and mechanical deformation in order to simulate some of the stress occurring in their actual use. After mechanical deformation and UV irradiation, samples were exposed to a proper thermal cycle in order to accelerate water uptake and to discriminate in very short time among different formulations. Electrochemical impedance spectroscopy (EIS) was used to monitor the evolution of the systems during the accelerated aging. Qc and Rp (i.e. the constant phase element describing the dielectric properties and the ionic resistance of the coating) were selected to describe the protective system evolution. Adhesive and barrier properties were monitored and discussed during the combined thermal-mechanical and photo-oxidative aging

  11. PERAN MP3EI BERBASIS ”NOT BUSINESS AS USUAL” UNTUK MENINGKATKAN DAYA SAING DAN PENYERAPAN TENAGA KERJA

    Directory of Open Access Journals (Sweden)

    Hardiansyah Nur Sahaya

    2015-12-01

    Full Text Available Indonesia, as a developing country, is currently facing a tremendous challenge. Global era can be an opportunity, a challenge, as well as a threat. In this globalization era, known as economic liberalization or free trade in services in particular labor. Indonesian workers are expected to be able to compete with workers from other countries. To meet the challenges of globalization workforce, the government has prepared MP3EI (Master Plan for the Acceleration and Expansion of Indonesia's Economic Development which is not based on common business. MP3EI is a government program that is made by considering the various advantages and potential, as well as the development challenges that Indonesia must face. However, in the implementation of the strategic role of MP3EI, there are still problems in terms of human resources, science and technology. Education focuses mainly on Java, less access to education, use of science and technology training, lack of infrastructure investment training. Therefore, we need a concrete solution in optimizing regional autonomy to address the education gap in each corridor, develop the concept of "one corridor, one potential school corridor". This concept is expected to optimize each economic corridor, regeneration and gradual training for cadres training centers, increasing government and private partnership (PPP in infrastructure investment in training through the implementation of regional autonomy.Indonesia sebagai bangsa yang sedang membangun, saat ini sedang menghadapi tantangan yang luar biasa. Era global dapat menjadi peluang, tantangan, sekaligus juga menjadi ancaman. Dalam era globalisasi yang dikenal dengan liberalisasi ekonomi atau perdagangan bebas khususnya bidang jasa tenaga kerja. Tenaga kerja Indonesia dituntut harus mampu bersaing dengan tenaga kerja dari negara lain. Untuk menjawab tantangan globalisasi tenaga kerja yang ada, pemerintah telah menyiapkan MP3EI (Masterplan Percepatan dan Perluasan

  12. Explosive Chromospheric Evaporation and Warm Rain in a GOES C3 Flare Observed by IRIS, Hinode/EIS, and RHESSI

    Science.gov (United States)

    Brosius, J. W.; Inglis, A. R.

    2017-12-01

    IRIS and Hinode/EIS observed a C3.1 flare in AR 12002 in stare mode on 2014 March 15.GOES observed the flare to start at 00:21:35 UT and peak at 00:26:30 UT. The IRIS slitwas pointed near the center of the flare while the EIS slit was pointed 35 arcsec westof the IRIS slit. About 4 minutes before the GOES flare start, the C II and Si IV lineintensities observed by IRIS became (and remained) significantly greater than theirpre-flare average values; this indicates that the flare had begun and that thechromosphere and transition region were involved. IRIS first detected significant,blueshifted Fe XXI emission at 00:22:42 UT, by which time the C II and Si IV lineintensities had increased by factors around 100 and their profiles were significantlyredshifted. This combination of simultaneous, cospatial blueshifted Fe XXI emissionwith redshifted C II and Si IV emission indicates explosive chromospheric evaporation.SDO's HMI observed a localized area of enhanced magnetic field strength toward thesouthernmost portion of the EIS slit's position that appears to be connected to theflare site by faint loops evident in AIA 131 A emission. EIS spectra at this locationreveal intensity enhancements by factors up to about 1.7 in the Fe XIV and Fe XVI lineemission, and the emergence of faint Fe XXIII emission that is too weak to measurevelocities. Emission lines from the two coronal ions show redshifts of about 9 km/saround 00:24:00 UT. The density sensitive line intensity ratio of Fe XIV 264.7/274.2observed by EIS reveals an increase of electron density from (1.03+/-0.20)X10^9 /cm^3before the flare to (3.58+/-0.68)X10^9 /cm^3 during the flare. This combination ofredshifted coronal line emission and increased coronal electron density is consistentwith explosively evaporated flare material observed by IRIS falling as warm rain andaccumulating in the remote area observed by EIS. A thermal/nonthermal fit to the hardX-ray spectrum observed by RHESSI yields a nonthermal energy injection

  13. Parameter changes during gradual flooding of a PEM fuel cell through EIS studies; Cambio en parametros de una celda de combustible PEM durante inundacion gradual mediante estudios de EIS

    Energy Technology Data Exchange (ETDEWEB)

    Cano Castillo, Ulises; Cruz Manzo, Samuel; Arriaga Hurtado, Gerardo [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Ortiz, Alondra; Orozco, German [Centro de Investigacion y Desarrollo Tecnologico en Electroquimica S.C. (CIDETEQ) (Mexico)

    2008-07-01

    The gradual flooding of a single PEM fuel cell was produced and Electrochemical Impedance Spectroscopy (EIS) measurements were realized in order to follow changes of the fuel cell impedance parameters. These changes were followed by using two equivalent circuit models: one simple model of the Randles type accounting for cathode and anode interfaces and a more complex model based on distributed elements, more suitable for porous electrodes in order to include protonic resistance of the catalyst layers. [Spanish] La inundacion gradual de una monocelda de combustible tipo PEM fue estudiada empleando espectroscopia de impedancia electroquimica (EIS), con el proposito de seguir cambios en los parametros de impedancia de la celda. Estos cambios fueron estudiados utilizando dos circuitos equivalentes: un modelo simple de tipo Randles, el cual considerara las interfaces del catodo y del anodo, y un modelo mas complejo basado en elementos distribuidos, el cual fuera adecuado para electrodos porosos, a fin de incluir la resistencia protonica de las capas catalizadoras.

  14. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  15. Ecological risks of DOE`s programmatic environmental restoration alternatives

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

  16. Wyoming DOE EPSCoR

    Energy Technology Data Exchange (ETDEWEB)

    Gern, W.A.

    2004-01-15

    All of the research and human resource development projects were systemic in nature with real potential for becoming self sustaining. They concentrated on building permanent structure, such as faculty expertise, research equipment, the SEM Minority Center, and the School of Environment and Natural Resources. It was the intent of the DOE/EPSCoR project to permanently change the way Wyoming does business in energy-related research, human development for science and engineering careers, and in relationships between Wyoming industry, State Government and UW. While there is still much to be done, the DOE/EPSCoR implementation award has been successful in accomplishing that change and enhancing UW's competitiveness associated with coal utilization, electrical energy efficiency, and environmental remediation.

  17. CRISPR/Cas9-Mediated Deletion of C1EIS Inhibits Chicken Embryonic Stem Cell Differentiation Into Male Germ Cells (Gallus gallus).

    Science.gov (United States)

    Zuo, Qisheng; Jin, Kai; Wang, Yingjie; Song, Jiuzhou; Zhang, Yani; Li, Bichun

    2017-08-01

    We previously found that C1EIS is preferentially expressed in Chicken spermatogonial stem cells (SSCs) by RNA sequencing (RNA-seq), so our current study focused on C1EIS's role in Chicken embryonic stem cells (ESCs) differentiation into male germ cells. We constructed a CRISPR/Cas9 vector targeting C1EIS. T7 endonuclease I (T7EI) digestion method and sequencing of TA cloning were used to detect the knock-out efficiency of the Single guide RNA (sgRNA) after the cas9/gRNA vector transfected into D fibroblasts 1(DF-1), ESCs, and Chicken embryos. The results showed that CRISPR/Cas9 gene knockout efficiency is about 40%. Differentiation of the targeted ESCs into SSCs was inhibited at the embryoid body stage due to C1EIS deficiency. Immunofluorescent staining revealed that the mutagenized ESCs (RA (Retinoic Acid) with C1EIS Knock out) expressed lower levels of integrin α6 and integrin β1 compared to wild type cells. Quantitative real-time PCR (QRT-PCR) revealed Oct4 and Sox2 expression significantly increased, contrarily integrin β1 and Stra8 expression significantly decreased than RA induced group and RA with C1EIS Overexpression. During retinoic acid-induced differentiation, knockout of C1EIS in ESCs inhibited formation of SSC-like cells, suggesting C1EIS plays a vital role in promoting differentiation of avian ESCs to SSCs by regulating expression of multiple pluripotency-related genes. J. Cell. Biochem. 118: 2380-2386, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  18. An EIS alternative for impedance measurement of a high temperature PEM fuel cell stack based on current pulse injection

    DEFF Research Database (Denmark)

    Jeppesen, Christian; Araya, Samuel Simon; Sahlin, Simon Lennart

    2017-01-01

    In this paper a method for estimating the fuel cell impedance is presented, namely the current pulse injection (CPI) method, which is well suited for online implementation. This method estimates the fuel cell impedance and unlike electrochemical impedance spectroscopy (EIS), it is simple...... to implement at a low cost. This makes it appealing as a characterization method for on-line diagnostic algorithms. In this work a parameter estimation method for estimation of equivalent electrical circuit (EEC) parameters, which is suited for on-line use is proposed. Tests on a 10 cell high temperature PEM...... fuel cell show that the method yields consistent results in estimating EEC parameters for different current pulse at different current loads, with a low variance. A comparison with EIS shows that despite its simplicity the response of CPI can reproduce well the impedance response of the high...

  19. EIS pitting temperature determination of A182 nickel based alloy in simulated BWR environment containing dilute seawater

    International Nuclear Information System (INIS)

    Lavigne, Olivier; Shoji, Tetsuo; Takeda, Yoichi

    2014-01-01

    Graphical abstract: - Highlights: • Stable pitting events in function of the temperature are monitored by electrochemical impedance spectroscopy. • The pitting temperature for the nickel based alloy A182 in solution containing 450 ppm Cl − is defined as above 160 °C. • The presented method can be applied for others passive alloys as stainless steel in solution containing aggressive anions. - Abstract: A method based on electrochemical impedance spectroscopy (EIS) measurements to monitor the pitting temperature of passive alloys in a given media is developed in this communication. The pitting corrosion behavior of the nickel based alloy 182 in water containing 450 ppm by weight of chloride is presented in this study. The analysis of the EIS fit parameters from the proposed equivalent electrical circuit allows to determine the temperature from which stable pitting event occurs at open circuit potential. For the A182 sample this temperature is measured above 160 °C

  20. Neon-like Iron Ion Lines Measured in NIFS/Large Helical Device (LHD) and Hinode /EUV Imaging Spectrometer (EIS)

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Tetsuya; Hara, Hirohisa [National Astronomical Observatory, National Institutes of Natural Sciences 2-21-1 Osawa Mitaka Tokyo, 181-8588 (Japan); Murakami, Izumi; Kato, Daiji; Morita, Shigeru [SOKENDAI (Graduate University for Advanced Studies) Hayama, Miura-gun, Kanagawa, 240-0193 (Japan); Sakaue, Hiroyuki A.; Suzuki, Chihiro; Tamura, Naoki [National Institute for Fusion Science, National Institutes of Natural Sciences 322-6 Oroshi-cho, Toki Gifu, 509-5292 (Japan); Yamamoto, Norimasa [Chubu University 1200 Matsumoto-cho, Kasugai Aichi, 487-0027 (Japan); Nakamura, Nobuyuki, E-mail: watanabe@uvlab.mtk.nao.ac.jp [The University of Electro-Communications 1-5-1 Chofugaoka, Chofu Tokyo, 182-8585 (Japan)

    2017-06-10

    Line intensities emerging from the Ne-sequence iron ion (Fe xvii) are measured in the laboratory, by the Large Helical Device at the National Institute for Fusion Science, and in the solar corona by the EUV Imaging Spectrometer (EIS) on board the Hinode mission. The intensity ratios of Fe xvii λ 204.6/ λ 254.8 are derived in the laboratory by unblending the contributions of the Fe xiii and xii line intensities. They are consistent with theoretical predictions and solar observations, the latter of which endorses the in-flight radiometric calibrations of the EIS instrument. The still remaining temperature-dependent behavior of the line ratio suggests the contamination of lower-temperature iron lines that are blended with the λ 204.6 line.

  1. EI Scale: an environmental impact assessment scale related to the construction materials used in the reinforced concrete

    Directory of Open Access Journals (Sweden)

    Gilson Morales

    2010-12-01

    Full Text Available This study aimed to create EI Scal, an environmental impact assessment scal, related to construction materials used in the reinforced concrete structure production. The main reason for that was based on the need to classify the environmental impact levels through indicators to assess the damage level process. The scale allowed converting information to estimate the environmental impact caused. Indicators were defined trough the requirements and classification criteria of impact aspects considering the eco-design theory. Moreover, the scale allowed classifying the materials and processes environmental impact through four score categories which resulted in a single final impact score. It was concluded that the EI scale could be cheap, accessible, and relevant tool for environmental impact controlling and reduction, allowing the planning and material specification to minimize the construction negative effects caused in the environment.

  2. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  3. Exploring EI in Belgium: a New Theoretical and Empirical Way to Deal with Environmental Conflicts in Urban Areas?

    OpenAIRE

    Lejeune, Zoé

    2013-01-01

    Environmental Inequalities (EI) –the unequal distribution of environmental goods and ‘bads’ among space and population– are a field of research at the crossroads of political science, socio-legal studies, and urban research. Unlike US Environmental Justice movement, environmental inequalities are not seen by actors, or studied, as a specific frame for action and collective mobilisation in Belgium in environmental matters. Environmental conflicts are however numerous in urban areas in Belgi...

  4. Erkko Autio : igaühest ei saa hiilgavat ettevõtjat / Erkko Autio ; interv. Toivo Tänavsuu

    Index Scriptorium Estoniae

    Autio, Erkko

    2007-01-01

    Londoni Imperial Kolledzhi professor Erkko Autio kommenteerib oma ettekannet Tallinnas toimunud gasellikonverentsil ning usub, et gasell ei ole sektoripõhine fenomen, vaid võimalik peaaegu igas majandusvaldkonnas kui riik loob soodsa ettevõtluskeskkonna. Vt. samas: iPoint haaras härjal sarvist; MySQL - lihtsalt geniaalne!; Värvikas gaselliguru Erkko Autio; Pille-Liis Kello. Kuidas Eestis toetatakse gaselle?

  5. EI Scale: an environmental impact assessment scale related to the construction materials used in the reinforced concrete

    OpenAIRE

    Gilson Morales; Antonio Edésio Jungles; Sheila Elisa Scheidemantel Klein; Juliana Guarda

    2010-01-01

    This study aimed to create EI Scal, an environmental impact assessment scal, related to construction materials used in the reinforced concrete structure production. The main reason for that was based on the need to classify the environmental impact levels through indicators to assess the damage level process. The scale allowed converting information to estimate the environmental impact caused. Indicators were defined trough the requirements and classification criteria of impact aspects consid...

  6. Ivar Tallo : presidendi erakorteris käinud peod mainet ei kahjusta / Ivar Tallo ; interv. Sigrid Laev

    Index Scriptorium Estoniae

    Tallo, Ivar, 1964-

    2006-01-01

    Avaliku halduse spetsialist vastab küsimustele, kuidas jaguneb Kadrioru lossis era- ja avalik ruum, kas on õigustatud presidendi kantselei taotlus registreerida kõik, ka erakülalised ning kas juhtunu võib kahjustada presidendi mainet. Kaart, skeem: Sissepääsud. Kommenteerivad Andrus Ansip, Villu Reiljan, Andrus Saar. Vt. samas: Presidendipaar palus vabandust; Garel Püüa. Kärmas: tegu ei ole vandenõuga

  7. Miks köögiviljakuningad ei taha ühineda? / Silja Lättemäe

    Index Scriptorium Estoniae

    Lättemäe, Silja, 1952-

    2006-01-01

    Euroopa Liit hüvitab osaliselt ühistegevuse kulud köögiviljasektoris. Eesti köögiviljakasvatajatel ei ole õnnestunud oma tootjaorganisatsiooni luua. Eesti juhtivad köögiviljatootjad on Ants Pak Kadarbiku talust, Kalle Reiter Agro AS-ist ja Johannes Valk Laheotsa talust. Vt. ka: Juur- ja köögiviljade eksport Eestist 2005. a jaanuar-oktoober

  8. Evaluation of the properties of anodized aluminum 6061 subjected to thermal cycling treatment using electrochemical impedance spectroscopy (EIS)

    Energy Technology Data Exchange (ETDEWEB)

    Huang Yuelong [Corrosion and Environmental Effects Laboratory (CEEL), Mork Family Department of Chemical Engineering and Materials Science, University of Southern California, Los Angeles, CA 90089-0241 (United States); Shih Hong [Lam Research Corporation, 4400 Cushing Parkway, Fremont, CA 94538 (United States)], E-mail: hong.shih@lamrc.com; Daugherty, John [Lam Research Corporation, 4400 Cushing Parkway, Fremont, CA 94538 (United States); Mansfeld, Florian [Corrosion and Environmental Effects Laboratory (CEEL), Mork Family Department of Chemical Engineering and Materials Science, University of Southern California, Los Angeles, CA 90089-0241 (United States)], E-mail: mansfeld@usc.edu

    2009-10-15

    The corrosion resistance of anodized Al 6061 produced by two different anodizing and sealing processes was evaluated for 30 days during exposure to 3.5 wt% NaCl using EIS. Thermal cycling treatments at 120, 160 and 200 deg. C have been applied for the two types of samples. The degradation of the properties of the anodized layers has been determined by thorough analysis of the EIS data for control samples and samples that had undergone thermal cycling. Scanning electron microscopy has been used to evaluate the damage to the anodized aluminum layers due to thermal cycling. It was found that the thermal treatment produced considerable damage of both the porous layer and the barrier layer. The EIS data suggest that some cracks extended into the bare metal. The damage of the oxide layers increased with increasing thermal cycling temperature for both types of samples. Self-sealing of the porous layer and the barrier layer occurred during immersion in NaCl.

  9. A model for determining the scope and level of detail that is appropriate for a programmatic EIS

    International Nuclear Information System (INIS)

    Eccleston, C.H.

    1995-03-01

    Since the inception of the National Environmental Policy Act (NEPA), no definitive guidance has been established for determining the scope of topics and issues, or the level of detail suitable for presentation within a Programmatic Environmental Impact Statement (P-EIS). Lacking such guidance, an inordinate amount of time and resources can be expended in determining the scope that is most appropriately addressed within a P-EIS versus the more detailed scope that is best reserved for lower-tier documents. Faced with this predicament, agencies often err on the side of including too much detail, resulting in P-EISs that are over bloated and unnecessarily complex. Moreover, lack of definitive guidance leads to a great deal of inconsistency in the preparation of P-EISs among federal agency programs. A paradigm for assisting decisionmakers in making such determinations is presented below. This model expedites the preparation of P-EISs by providing a consistent and systematic approach for determining the scope and level of detail that is most appropriately addressed at the programmatic level. In many cases, the model provides agencies with an effective tool for managing and streamlining the NEPA process by de-scoping needless and unnecessary issues from the scope of a P-EIS

  10. Nanostructured gold microelectrodes for SERS and EIS measurements by incorporating ZnO nanorod growth with electroplating

    Science.gov (United States)

    Zong, Xianli; Zhu, Rong; Guo, Xiaoliang

    2015-01-01

    In this paper, a fine gold nanostructure synthesized on selective planar microelectrodes in micro-chip is realized by using an advanced hybrid fabrication approach incorporating growth of nanorods (NRs) with gold electroplating. By this developed nanostructure, integration of in-situ surface-enhanced Raman spectroscopy (SERS) detection with electrochemical impedance spectroscopy (EIS) measurement for label-free, nondestructive, real-time and rapid monitoring on a single cell has been achieved. Moreover, parameters of Au nanostructures such as size of nanoholes/nanogaps can be controllably adjusted in the fabrication. We have demonstrated a SERS enhancement factor of up to ~2.24 × 106 and double-layer impedance decrease ratio of 90% ~ 95% at low frequency range below 200 kHz by using nanostructured microelectrodes. SERS detection and in-situ EIS measurement of a trapped single cell by using planar microelectrodes are realized to demonstrate the compatibility, multi-functions, high-sensitivity and simplicity of the micro-chip system. This dual function platform integrating SERS and EIS is of great significance in biological, biochemical and biomedical applications. PMID:26558325

  11. Combined chemical and EIS study of the reaction of zinc coatings under alkaline conditions

    International Nuclear Information System (INIS)

    Walkner, Sarah; Hassel, Achim Walter

    2014-01-01

    Graphical abstract: - Highlights: • An electrochemical unit for automatic EIS and pH modulation is used. • ZnMg2Al2 and ZnAl53 are studied in alkaline solutions. • Amount of consumed sodium hydroxide allows following hydroxide formation and film thickness. • Cross sections of 13 μm show excellent agreement with consumed hydroxide. • ZnAl53 consumes more hydroxide due to soluble aluminate formation. - Abstract: Two different zinc coatings of composition ZnMg2Al2 (Zn + 2 wt.% Mg + 2 wt.% Al) and ZnAl53 (Zn + 53 wt.% Al) were investigated in aqueous solution at pH 12.0 with a novel setup, the so-called impedance titrator. This device is able to perform electrochemical measurements including, but not limited to, impedance spectroscopy in dependency of different pH-values. The setup allows holding the pH-value with a precision of at least 0.05 by dosing the required amount of titrating agent to the system. If the alkaline pH region is investigated, hydroxide ions are consumed in the course of passive layer formation. The amount of consumed hydroxide allows to quantitatively follow the formation of the hydroxide film and its thickness. Cross section SEM shows an excellent agreement of 13 μm after 7 h for ZnMg2Al2. At a constant pH value, the hydroxide concentration is constant and film formation is well defined and kinetically characterised. The consumption of hydroxide by the ZnAl53 coating is higher resulting from the solubility of the Al as aluminate under alkaline conditions. The composition of the precipitates contains less than 3 wt.% of Al. The observed processes and the formation of corrosion products are recorded and differences in the behaviour of the two coatings are discussed

  12. NCEP-DOE AMIP-II Reanalysis

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The NCEP-DOE Reanalysis 2 project is using a state-of-the-art analysis/forecast system to perform data assimilation using past data from 1979 through near present....

  13. DOE technical standards list. Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listing of current DOE technical standards, non-Government standards that have been adopted by DOE, other Government documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  14. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  15. Review of the SEERG process for DOE

    International Nuclear Information System (INIS)

    Budnitz, R.J.

    1991-01-01

    The Senior External Events Review Group (SEERG) has been assembled by Lawrence Livermore National Laboratory to advise the Department of Energy on those aspects of DOE's New Production Reactor project involving external events (earthquakes, high winds, flooding, etc.) The Review Group is an independent advisory body comprised of experts in a broad range of technical disciplines relevant to its charter. This brief paper will provide an overview of what SEERG is and what it does for DOE

  16. 77 FR 67345 - Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Clearwater...

    Science.gov (United States)

    2012-11-09

    ...The U.S. Army Corps of Engineers (Corps) in conjunction with the Sanitation Districts of Los Angeles County (Sanitation Districts) has completed a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Clearwater Program. The Clearwater Program is a comprehensive planning effort undertaken by the Sanitation Districts for the Joint Outfall System, a regional wastewater management system serving approximately 4.8 million people in 73 cities and unincorporated areas in Los Angeles County. A major component of the Clearwater Program is the evaluation of alternatives for construction of a new ocean outfall and rehabilitation of the existing ocean outfalls. Both activities would entail discharge of dredged and fill material in waters of the United States, work in navigable waters of the United States, and the transport of dredged material for ocean disposal. These activities would require authorization from the Corps pursuant to Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act, respectively. The Draft EIS/EIR was circulated for a 57-day review period from February 13, 2012 through April 10, 2012. The Corps and the Sanitation Districts reviewed and provided responses to 19 agency comments and 33 public comments in preparing the Final EIS/EIR. The Final EIS/EIR, including a Draft 404(b)(1) alternatives analysis, is available for a 31-day review period from November 9, 2012 through December 10, 2012. The document is accessible via the World- Wide Web at www.ClearwaterProgram.org. Alternatively, printed copies are available at the following locations: Sanitation Districts of Los Angeles County, 1955 Workman Mill Road, Whittier, California; Carson Regional Library, 151 East Carson Street, Carson, California; Los Angeles Public Library, San Pedro Branch, 931 South Gaffey Street, San Pedro, California; and Los Angeles Public Library, Wilmington

  17. Dive Data from Expedition Information System (EIS) for Islands in the Stream 2002 - Pharmaceutical Discovery, Vision, and Bioluminescence - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Expeditions Information System (EIS) contains information recorded by the NOAA Office of Ocean Exploration's data manager during the 2002 "Islands in the Stream...

  18. Electrical impedance spectroscopy (EIS)-based evaluation of biological tissue phantoms to study multifrequency electrical impedance tomography (Mf-EIT) systems

    KAUST Repository

    Bera, Tushar Kanti; Nagaraju, J.; Lubineau, Gilles

    2016-01-01

    . In this direction the impedance responses of the saline solution (background) and a number vegetable and fruit tissues (inhomogeneities) are studied with electrical impedance spectroscopy (EIS) and the frequency responses of bioelectrical impedance and conductivity

  19. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  20. Adding Impacts and Mitigation Measures to OpenEI's RAPID Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, Erin

    2017-05-01

    The Open Energy Information platform hosts the Regulatory and Permitting Information Desktop (RAPID) Toolkit to provide renewable energy permitting information on federal and state regulatory processes. One of the RAPID Toolkit's functions is to help streamline the geothermal permitting processes outlined in the National Environmental Policy Act (NEPA). This is particularly important in the geothermal energy sector since each development phase requires separate land analysis to acquire exploration, well field drilling, and power plant construction permits. Using the Environmental Assessment documents included in RAPID's NEPA Database, the RAPID team identified 37 resource categories that a geothermal project may impact. Examples include impacts to geology and minerals, nearby endangered species, or water quality standards. To provide federal regulators, project developers, consultants, and the public with typical impacts and mitigation measures for geothermal projects, the RAPID team has provided overview webpages of each of these 37 resource categories with a sidebar query to reference related NEPA documents in the NEPA Database. This project is an expansion of a previous project that analyzed the time to complete NEPA environmental review for various geothermal activities. The NEPA review not only focused on geothermal projects within the Bureau of Land Management and U.S. Forest Service managed lands, but also projects funded by the Department of Energy. Timeline barriers found were: extensive public comments and involvement; content overlap in NEPA documents, and discovery of impacted resources such as endangered species or cultural sites.