WorldWideScience

Sample records for project design work

  1. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  2. Involving Assessment Buddies in the Assessment of Design Project Work

    Science.gov (United States)

    Osmond, Jane; Clough, Brian

    2012-01-01

    This paper discusses the impact of a specially developed assessment and feedback system implemented within a second year industrial design module at Coventry University, UK. The "Assessment Buddy" system was developed in response to the need for a successful assessment and feedback method that could cope with the complexities of a…

  3. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  4. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  5. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  6. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  7. Promises, Premises and Risks: Sharing Responsibilities, Working Up Trust and Sustaining Commitment in Participatory Design Projects

    DEFF Research Database (Denmark)

    Büscher, Monika; Hartswood, Mark; Mogensen, Preben Holst

    2002-01-01

    While participatory design crosses the boundaries between technology production and use, it does not erase them. In accounts of participatory projects, the work of negotiating and changing these boundaries often recedes into the background, yet it is crucial in shaping the very nature and scope o...

  8. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  9. Conceptual design statement of work for the immobilized low-activity waste disposal facility, project W-520

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1998-01-01

    This Statement of Work outlines the deliverables and schedule for preparation of the Project W-520 Conceptual Design Report, including, work plans, site development plan, preliminary safety evaluation, and conceptual design

  10. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  11. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  12. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  13. Organizing design work

    DEFF Research Database (Denmark)

    Scheuer, John Damm

    2016-01-01

    The aim of this paper is to demonstrate the importance of the kind of understanding of organizing that is implied by design theories for project managers' understanding and organizing of design work. Five theories and their organizing consequences for project managers organizing of design work...... are analyzed. The paper contributes to design research and organization studies by putting the organizing of design projects on the research agenda. It also contributes by demonstrating the importance of being aware of the ontological and epistemological assumptions and organizing consequences of different...... design theories. The selected theories of design thus represent different views on what design is, address different design areas and are based on different ontological and epistemological assumptions that influence their views on how design processes should be organized....

  14. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  15. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  16. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  17. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  18. IT Project Portfolio Management: Vertical and Horizontal Work Design Problems in a Public Organization

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2013-01-01

    arbejder på at forbedre dens IT PPM praksisser. Undersøgelsen anvender Work Design Teori til at analysere kommunens IT PPM praksisser på tværs af hierarkiske niveauer og organisatoriske enheder i bestræbelsen på, at besvare følgende tre forskningsspørgsmål:(1) Hvordan udfører en offentlig organisation...... and Van De Ven’s (2005) Work Design Teori, der sondrer mellem vertikal- og horisontal arbejdsdeling. Vertikal deling af arbejde bliver betragtet som fordelingen af autoritet, viden og resurser, hvilket undersøgelsen finder værende delt ud på fire hierarkiske niveauer: (1) det politiske niveau med den...... af det andet forskningsspørgsmål anvendes Work Design Teori til at identificere problemer indenfor tre relaterede problemområder: hierarkiske dekompositions problemer, modularitets problemer og komplekse netværks problemer. De identificerede problemer er sammenfattet i en model bestående af 14...

  19. IT Project Portfolio Management: Vertical and Horizontal Work Design Problems in a Public Organization

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    dansk kommune, der arbejder på at forbedre dens IT PPM praksisser. Undersøgelsen anvender Work Design Teori til at analysere kommunens IT PPM praksisser på tværs af hierarkiske niveauer og organisatoriske enheder i bestræbelsen på, at besvare følgende tre forskningsspørgsmål:(1) Hvordan udfører en...... at trække på Sinha and Van De Ven’s (2005) Work Design Teori, der sondrer mellem vertikal- og horisontal arbejdsdeling. Vertikal deling af arbejde bliver betragtet som fordelingen af autoritet, viden og resurser, hvilket undersøgelsen finder værende delt ud på fire hierarkiske niveauer: (1) det politiske...... kommunens IT projektgrupper. I besvarelsen af det andet forskningsspørgsmål anvendes Work Design Teori til at identificere problemer indenfor tre relaterede problemområder: hierarkiske dekompositions problemer, modularitets problemer og komplekse netværks problemer. De identificerede problemer er...

  20. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  1. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  2. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  3. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  4. Improving collaborative work and project management in a nuclear power plant design team: A human-centered design approach

    International Nuclear Information System (INIS)

    Boy, Guy André; Jani, Gopal; Manera, Annalisa; Memmott, Matthew; Petrovic, Bojan; Rayad, Yassine; Stephane, Lucas; Suri, Neha

    2016-01-01

    This article presents a collaborative system, called SCORE, useful for a multi-disciplinary team designing a new nuclear power plant (NPP). It was developed during the first phase of the I 2 S-LWR project (Integral Inherently Safe Light Water Reactor). SCORE enables the generation of design cards (DCs). A DC includes four main spaces (Boy, 2005): (1) a rationalization space where the various components of the system being designed (SBD) are described in terms of design rationale, integration and requirements; this space includes declarative and procedural descriptions and statements; (2) an activity space where the current version of the SBD is displayed; it includes static and dynamic features; this space enables SBD manipulation; (3) a structure space where the various components and their inter-relations are formally and declaratively described as systems of systems; (4) a function space where the various functions of the SBD are described in terms of procedural knowledge and dynamic processes involved; this space includes qualitative and quantitative physical and cognitive models. The rationalization space is informed using an adapted version of the QOC method (Questions, Options, Criteria), which was tested within the I 2 S-LWR design team. The activity space contains 3D models developed using AutoDesk Inventor, and transferred into the Unity game engine web player in order to facilitate integration within the DC spaces and enable intuitive manipulation of objects in the activity space. Two additional spaces were added: an instant messaging capability that allows design team members (DTMs) to exchange with one another on a DC; and a structured evaluation space. DCs are cooperatively created and refined by DTMs, and synthesized during periodic design meetings, the frequency of which may vary. Incrementally combining abstract explanations of designed elements and integration with their explicit visual representation improves mutual understanding among DTMs, and

  5. Designing Business and Technology Management Work-Packages in Cleantech Research Projects

    DEFF Research Database (Denmark)

    Tambo, Torben; Enevoldsen, Peter

    2014-01-01

    a clearer and more explicit perspective of conversion from research to business in to research project in energy storage. This paper suggests a model view on the conversion capability within cleantech research projects in order to anchor a distinctive and methodological consideration for business...

  6. Motivation, values, and work design as drivers of participation in the R open source project for statistical computing

    Science.gov (United States)

    Mair, Patrick; Hofmann, Eva; Gruber, Kathrin; Hatzinger, Reinhold; Zeileis, Achim; Hornik, Kurt

    2015-01-01

    One of the cornerstones of the R system for statistical computing is the multitude of packages contributed by numerous package authors. This amount of packages makes an extremely broad range of statistical techniques and other quantitative methods freely available. Thus far, no empirical study has investigated psychological factors that drive authors to participate in the R project. This article presents a study of R package authors, collecting data on different types of participation (number of packages, participation in mailing lists, participation in conferences), three psychological scales (types of motivation, psychological values, and work design characteristics), and various socio-demographic factors. The data are analyzed using item response models and subsequent generalized linear models, showing that the most important determinants for participation are a hybrid form of motivation and the social characteristics of the work design. Other factors are found to have less impact or influence only specific aspects of participation. PMID:26554005

  7. Motivation, values, and work design as drivers of participation in the R open source project for statistical computing.

    Science.gov (United States)

    Mair, Patrick; Hofmann, Eva; Gruber, Kathrin; Hatzinger, Reinhold; Zeileis, Achim; Hornik, Kurt

    2015-12-01

    One of the cornerstones of the R system for statistical computing is the multitude of packages contributed by numerous package authors. This amount of packages makes an extremely broad range of statistical techniques and other quantitative methods freely available. Thus far, no empirical study has investigated psychological factors that drive authors to participate in the R project. This article presents a study of R package authors, collecting data on different types of participation (number of packages, participation in mailing lists, participation in conferences), three psychological scales (types of motivation, psychological values, and work design characteristics), and various socio-demographic factors. The data are analyzed using item response models and subsequent generalized linear models, showing that the most important determinants for participation are a hybrid form of motivation and the social characteristics of the work design. Other factors are found to have less impact or influence only specific aspects of participation.

  8. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  9. Job and Work Design

    OpenAIRE

    Van den Broeck, Anja; Parker, Sharon K.

    2017-01-01

    Job design or work design refers to the content, structure, and organization of tasks and activities. It is mostly studied in terms of job characteristics, such as autonomy, workload, role problems, and feedback. Throughout history, job design has moved away from a sole focus on efficiency and productivity to more motivational job designs, including the social approach toward work, Herzberg’s two-factor model, Hackman and Oldham’s job characteristics model, the job demand control model of Kar...

  10. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  11. Human Work Interaction Design

    DEFF Research Database (Denmark)

    Lopes, Arminda; Ørngreen, Rikke

    This book constitutes the thoroughly refereed post-conference proceedings of the Third IFIP WG 13.6 Working Conference on Human Work Interaction Design, HWID 2012, held in Copenhagen, Denmark, in December 2012. The 16 revised papers presented were carefully selected for inclusion in this volume...

  12. Human Work Interaction Design

    DEFF Research Database (Denmark)

    Gonçalves, Frederica; Campos, Pedro; Clemmensen, Torkil

    2015-01-01

    In this paper, we review research in the emerging practice and research field of Human Work Interaction Design (HWID). We present a HWID frame-work, and a sample of 54 papers from workshops, conferences and journals from the period 2009-2014. We group the papers into six topical groups, and then ...

  13. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  14. Work Zone Design and Operations Enhancements

    Science.gov (United States)

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  15. Interdisciplinary Problem Oriented Project Work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2018-01-01

    In this chapter, we analyze the problem oriented project work practiced at the Bachelor Study Program in Natural Science (Nat Bach) at Roskilde University (RU) as a learning environment for developing students’ mathematical modelling competence. The projects are conducted in a rather sophisticated...... and radical learning environment grounded on the four pedagogical key principles of, problem orientation, participant directed group work, interdisciplinarity and exemplarity. We illustrate and discuss the interplay between the aim of developing the students’ modelling competence on the one hand...

  16. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  17. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  18. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  19. Restucturing the Project Work Format

    DEFF Research Database (Denmark)

    Dupont, Søren

    2015-01-01

    The chapter is based on an evaluation of a pedagogical experiment at Roskilde University, the Antology Experiment. The objective of the experiment was to develop and expand the framework for project work through the production of anthologies compiled collectively by a number of project groups....... The novel aspects of the Anthology Experiment were most notably its magnitude and complexity. In this experiment the groups were totalling some 50 students who were working together. The experiment used a well-known publishing format from research, namely the anthology form, which usually focuses...... on a specific research topic and includes contributions from various researchers. In the Anthology Experiment, the project groups could be viewed as ‘research units’ that produce the contributions to the anthology. The complexity of the experiment offered challenges, both for students and supervisors...

  20. Problem-Oriented Project Work

    DEFF Research Database (Denmark)

    Olsen, Poul Bitsch; Pedersen, Nils Kaare

    This book is meant to support problem-oriented learning activities. Problem-orientation concerns the reasoning about lack of knowledge, while project work includes the ethnomethods that are practiced when collectives produce scientific knowledge. This book reflects particular methods related...

  1. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  2. Design of the DISCovery project: tailored work-oriented interventions to improve employee health, well-being, and performance-related outcomes in hospital care

    Directory of Open Access Journals (Sweden)

    Niks Irene MW

    2013-02-01

    Full Text Available Abstract Background It is well-known that health care workers in today’s general hospitals have to deal with high levels of job demands, which could have negative effects on their health, well-being, and job performance. A way to reduce job-related stress reactions and to optimize positive work-related outcomes is to raise the level of specific job resources and opportunities to recover from work. However, the question remains how to translate the optimization of the balance between job demands, job resources, and recovery opportunities into effective workplace interventions. The aim of the DISCovery project is to develop and implement tailored work-oriented interventions to improve health, well-being, and performance of health care personnel. Methods/Design A quasi-experimental field study with a non-equivalent control group pretest-posttest design will be conducted in a top general hospital. Four existing organizational departments will provide both an intervention and a comparison group. Two types of research methods are used: (1 a longitudinal web-based survey study, and (2 a longitudinal daily diary study. After base-line measures of both methods, existing and yet to be developed interventions will be implemented within the experimental groups. Follow-up measurements will be taken one and two years after the base-line measures to analyze short-term and long-term effects of the interventions. Additionally, a process evaluation and a cost-effectiveness analysis will be carried out. Discussion The DISCovery project fulfills a strong need for theory-driven and scientifically well-performed research on job stress and performance interventions. It will provide insight into (1 how a balance between job demands, job resources, and recovery from work can be optimized, (2 the short-term and long-term effects of tailored work-oriented effects, and (3 indicators for successful or unsuccessful implementation of interventions.

  3. Human Work Interaction Design

    DEFF Research Database (Denmark)

    Lopes, Arminda; Ørngreen, Rikke

    . The papers reflect many different areas and address many complex and diverse work domains, ranging from medical user interfaces, work and speech interactions at elderly care facilities, greenhouse climate control, navigating through large oil industry engineering models, crisis management, library usability...

  4. Alternative Work Schedules: Designing Compatible Work Systems

    Science.gov (United States)

    Steen, Pamela L.

    1977-01-01

    Attempts to improve the quality of working life through changes in environmental factors, such as flexible hours, are likely to bring limited and short-term advantages unless the work process itself is well-designed and compatible with the environmental changes. (Author/LBH)

  5. Design of the DISCovery project: tailored work-oriented interventions to improve employee health, well-being, and performance-related outcomes in hospital care.

    Science.gov (United States)

    Niks, Irene M W; de Jonge, Jan; Gevers, Josette M P; Houtman, Irene L D

    2013-02-19

    It is well-known that health care workers in today's general hospitals have to deal with high levels of job demands, which could have negative effects on their health, well-being, and job performance. A way to reduce job-related stress reactions and to optimize positive work-related outcomes is to raise the level of specific job resources and opportunities to recover from work. However, the question remains how to translate the optimization of the balance between job demands, job resources, and recovery opportunities into effective workplace interventions. The aim of the DISCovery project is to develop and implement tailored work-oriented interventions to improve health, well-being, and performance of health care personnel. A quasi-experimental field study with a non-equivalent control group pretest-posttest design will be conducted in a top general hospital. Four existing organizational departments will provide both an intervention and a comparison group. Two types of research methods are used: (1) a longitudinal web-based survey study, and (2) a longitudinal daily diary study. After base-line measures of both methods, existing and yet to be developed interventions will be implemented within the experimental groups. Follow-up measurements will be taken one and two years after the base-line measures to analyze short-term and long-term effects of the interventions. Additionally, a process evaluation and a cost-effectiveness analysis will be carried out. The DISCovery project fulfills a strong need for theory-driven and scientifically well-performed research on job stress and performance interventions. It will provide insight into (1) how a balance between job demands, job resources, and recovery from work can be optimized, (2) the short-term and long-term effects of tailored work-oriented effects, and (3) indicators for successful or unsuccessful implementation of interventions.

  6. Working With New Designs

    DEFF Research Database (Denmark)

    Visholm, Steen; Beck, Ulla Charlotte

    2014-01-01

    In this paper the learning concept of group relations conferences are discussed. The authors have worked with group relations conferences (GRC) in different contexts for many years-mainly as a part of educational programmes for managers and consultants (OPU at IGA Copenhagen, MPO at Roskilde...... University, and NAPSO). Seen from the horizon of their experience some of the basic concepts in the theories about GRC need clarifying, revision, and development. The GRC is a part of the learning from experience movement and as a consequence it stresses the underlying basis: learning is personal so everyone...... decides for themselves what makes sense and what does not. This principle sometimes work as a defence against a closer examination of the two questions: does GRCs provide relevant experiences to learn from, and what is it you learn or can expect to learn at a GRC. While two earlier papers (Beck & Visholm...

  7. Design of underwater work systems

    International Nuclear Information System (INIS)

    Lovelace, R.B.

    1980-01-01

    In the near future, underwater vehicles will replace divers as the principal means for inspection and maintenance work. These vehicles will provide a maneuverable work platform for an underwater viewing system and manipulator/tool package. Some of the problems faced by the underwater designer, and some areas to consider in the design of an integrated underwater work system, are considered

  8. Civil Works Seismic Designs

    International Nuclear Information System (INIS)

    1985-12-01

    RFS or Regles Fondamentales de Surete (Basic Safety Rules) applicable to certain types of nuclear facilities lay down requirements with which compliance, for the type of facilities and within the scope of application covered by the RFS, is considered to be equivalent to compliance with technical French regulatory practice. The object of the RFS is to take advantage of standardization in the field of safety, while allowing for technical progress in that field. They are designed to enable the operating utility and contractors to know the rules pertaining to various subjects which are considered to be acceptable by the Service Central de Surete des Installations Nucleaires, or the SCSIN (Central Department for the Safety of Nuclear Facilities). These RFS should make safety analysis easier and lead to better understanding between experts and individuals concerned with the problems of nuclear safety. The SCSIN reserves the right to modify, when considered necessary, any RFS and specify, if need be, the terms under which a modification is deemed retroactive. This rule defines: - the parameters characterizing the design seismic motions - the calculation methods - the mathematical schematization principles on which calculations are based - the use of the seismic response for the structure checking - the content of the documents to be presented

  9. Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    Simonsen, J. (2006): Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens, Paper presented at the PDC 2006 workshop on: Reconfiguring Healthcare: Issues in Computer Supported Cooperative Work in Healthcare Environments. Participatory Design Conference, Trento, Italy, August...

  10. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  11. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    -study, whereas the project study form is based on collaboration and dialogue. Consequently, successful implementation of project work in distance education requires extensive utilisation of new information and communication technology. In this paper the experiences of project work in a new Master of Industrial...... devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons...

  12. Various advanced design projects promoting engineering education

    Science.gov (United States)

    1994-01-01

    The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

  13. An overview of the US work to complete the design of Blanket Shield Modules 7,12 and 13 for the ITER project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Coats, R.; Garde, J.

    2007-01-01

    Part of the US contribution to the ITER project is Blanket Shield Modules (BSM) number 7, 12 and 13 comprising about 20% of the ITER First Wall. These modules are all in the upper half of the vacuum vessel. Starting from outlines of each style of module, general design rules contained in the ITER Design Description Document (DDD), design memos, and CATIA interface drawings, the US Team has worked to fill in the details of the internal water cooling passages, slits to control eddy currents, and methods for efficient and reliable manufacturing of the BSM. Our analysis begins with nuclear heating assessment of complex 3D structures containing water, copper, and steel carried out by the University of Wisconsin using a version of Monte Carlo N-Particle Transport Code (MCNP) that connects directly to CATIA to get the geometry. Computational Fluid Dynamics (CFD) analysis of the coolant flow distribution and pressure drop in a shield module provides the basis for thermal transfer from the BSM to the coolant. The size and position of coolant passages are adjusted to optimize the heat transfer and eliminate hot spots. ITER specified major disruption (MD) and downward vertical disruption (VDE) events are used to calculate the currents induced in the BSM. In this modeling it is necessary to include the vacuum vessel and other BSM near the modules of interest. In order to benchmark the OPERA Electromagnetic Code against the one used for the DDD analysis, we calculated eddy currents and forces on all 18 BSM in a simplified model that matched analysis by Japan. The eddy current forces are used to determine the torque and net force on the BSM. These forces are compared to the load capacity of the mounts and adjustments made to eddy current control slits as needed. Dynamic analysis of the eddy current induced stresses on the BSM and mounts are performed using the ABAQUS code. Static thermal and pressure stresses are calculated using the temperature distributions from CFD analysis

  14. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  15. Changing work practices in design

    DEFF Research Database (Denmark)

    Bødker, Keld; Kensing, Finn; Simonsen, Jesper

    2002-01-01

    The chapter reflects on activitites in three IT-organizations to change work practices in early design activitites. The activitites in the three organizations were related to introducing a new method for design in an organizational context, developed by the authors (Kensing et al., 1998a). The me......The chapter reflects on activitites in three IT-organizations to change work practices in early design activitites. The activitites in the three organizations were related to introducing a new method for design in an organizational context, developed by the authors (Kensing et al., 1998a...

  16. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  17. EASYTRACK Project: Work package 3

    DEFF Research Database (Denmark)

    Savio, Enrico; De Chiffre, Leonardo

    ). For this project, the Centre for Geometrical Metrology (CGM) at the Technical University of Denmark (DTU) has taken care of freeform measurements, in collaboration with the Dipartimento di Innovazione Meccanica e Gestionale (DIMEG) - University of Padova - Italy. The present report describes feasibility...... and experimental results of calibrations of freeform parts on CMMs as contribution to development of the ISO 15530 series of standards currently under consideration by the ISO TC 213/WG10....

  18. Changing Work Practices in Design

    DEFF Research Database (Denmark)

    Bødker, Keld; Kensing, F.; Simonsen, Jesper

    2000-01-01

    The paper presents lessons learned in relation to changing work practices in design. We describe method dissemination activities in three IT-organisations in relation to introducing a method for design in an organisational context. From the activities a number of lessons are drawn....

  19. INNOVATIVE DATABASE MANAGEMENT SYSTEM OF DESIGN WORKS

    Directory of Open Access Journals (Sweden)

    Albina Ahmetova

    2012-01-01

    Full Text Available The article discusses the definition of a professional thinking in design, on which the formation, the embodiment of the project and implementation of the ideas of the customer is based. The article is proposed to teach students the proper approach to the appearance and presentation of the professional and educational works.

  20. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons....... As the experience since then has proven this to be a very successful innovation in higher education [1], it seems to be an obvious idea also to base our new distance educations on the project study form. Traditionally, however, distance education has been characterized by one-way communication and self...

  1. A critical Social Work project

    Directory of Open Access Journals (Sweden)

    Carlos Montaño

    2006-04-01

    Full Text Available Contemporary social transformations, operated by the neoliberal program under the command of financial capital, bring new challenges to the group of citizens and men and women who live by the sale of their labor power. Social workers, individually and collectively, are not separate from this reality. The profession was characterized by its confrontation with these challenges and its questioning and analysis of its role in society, in its attempt to assume more critical profiles and commitments to the interests of workers and the subaltern sectors. An example of this is the “Reconceptualization Movement” and the later attempt to define na “Alternative Social Service” concerned with the meaning of its practice, with the process of critical knowledge, with a criticism of capitalism and its situations of social injustice. The current challenges include overcoming earlier weaknesses, collectively constructing an ethicalpolitical professional project that can competently and committedly confront, at the heart of progressive social forces, the conditions in which workers live (with or without employment as well as other subaltern populations.

  2. Work zone design and operation enhancements : final report, March 2010.

    Science.gov (United States)

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  3. Constructing new working practices through project narratives

    NARCIS (Netherlands)

    Veenswijk, M.B.; Berendse, M.

    2008-01-01

    In this article we focus on the (internal and external) dynamics of New Public Management (NPM) in the daily life of project management. We concentrate on the ways NPM concepts work out in the realities of project actors. Based on recent research within the Dutch infrastructure sector, we analyse

  4. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  5. Group Organized Project Work in Distance Education

    DEFF Research Database (Denmark)

    Helbo, Jan; Knudsen, Morten; Jensen, Lars Peter

    2001-01-01

    Project organized problem based learning is a successful concept for on-campus education at Aalborg University. Recently this "Aalborg concept" has been used in networked distance education as well. This paper describes the experiences from two years of Internet-mediated project work in a new...... Master of Information Technology education. The main conclusions are, that the project work is a strong learning motivator, enhancing peer collaboration, for off-campus students as well. However, the concept cannot be directly transferred to off-campus learning. The main reasons are that the students...... must communicate electronically, and that they are under a fierce time strain, studying part time and typically with a full time job and a family. In this paper, the main problems experienced with group organized project work in distance education are described, and some possible solutions are listed...

  6. Identification of Design Work Patterns by Retrospective Analysis of Work Sheets

    DEFF Research Database (Denmark)

    Hansen, Claus Thorp

    1999-01-01

    project is carried out where we seek to identify design work patterns by retrospective analysis of documentation created during design projects.An elements to satisfy the wish for an efficient design process could be to identify work patterns applied by engineering designers, evaluate these patterns...... with respect to their efficiency, and reuse the most efficient in future projects. Thus, the objective of this research is to analyse design projects in order to identify the work patterns applied. Based on an evaluation of identified work patterns we expect a recommendation of work patterns supporting...... an efficient design process can be established.In this paper we describe the analysis method, and present observations from analyses of three projects....

  7. Sustainable Smart Grid Project Design

    International Nuclear Information System (INIS)

    Szabo, I.

    2014-01-01

    Living together with the SG project generation issues in the last years a significant conclusion revealed from the unknown universe. Technology is not the missing condition for a real-time working country-wide SG power system realization. Technologies are developed, and 'SG-ready'. Engineering society is waiting for the signal to jump till the Moon or even farther. There are technical discussions about SG technologies. All there are marginal (ie. network safety issues, metering issues, electromobility etc.) and projects are mostly targeting the industrial players which obviously want to sell their utmost technologies taking generally not into consideration the overall social interests. The most anticipated question is: Who owns the social responsibility of the future (and as a part of it) its contemporary electric power utility system's responsibility? What should happen in order to start real development of 21st century's power system? How to open eyes of decision makers and energy institutions? Are these auxiliary SG projects natural evolution of the final solutions and systems? (author).

  8. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  9. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  10. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  11. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  12. Project X: Accelerator Reference Design

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, Stephen D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-06-20

    Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible

  13. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  14. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  15. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  16. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  17. Teaching mathematical modelling through project work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2006-01-01

    are reported in manners suitable for internet publication for colleagues. The reports and the related discussions reveal interesting dilemmas concerning the teaching of mathematical modelling and how to cope with these through “setting the scene” for the students modelling projects and through dialogues......The paper presents and analyses experiences from developing and running an in-service course in project work and mathematical modelling for mathematics teachers in the Danish gymnasium, e.g. upper secondary level, grade 10-12. The course objective is to support the teachers to develop, try out...... in their own classes, evaluate and report a project based problem oriented course in mathematical modelling. The in-service course runs over one semester and includes three seminars of 3, 1 and 2 days. Experiences show that the course objectives in general are fulfilled and that the course projects...

  18. EDITORIAL: Student undergraduate laboratory and project work

    Science.gov (United States)

    Schumacher, Dieter

    2007-05-01

    that new experiments which illustrate both fundamental physics and modern technology can be realized even with a small budget. Traditional labwork courses often provide a catalogue of well known experiments. The students must first learn the theoretical background. They then assemble the setup from specified equipment, collect the data and perform the default data processing. However, there is no way to learn to swim without water. In order to achieve a constructivist access to learning, 'project labs' are needed. In a project labwork course a small group of students works as a team on a mini research project. The students have to specify the question of research, develop a suitable experimental setup, conduct the experiment and find a suitable way to evaluate the data. Finally they must present their results e.g. in the framework of a public poster session. Three contributions refer to this approach, however they focus on different aspects: 'Project laboratory for first-year students' by Gorazd Planinšič, 'RealTime Physics: active learning laboratories' by David Sokoloff et al and 'Labs outside labs: miniprojects at a spring camp for future physics teachers' by Leos Dvorák. Is it possible to prepare the students specifically for project labwork? This question is answered by the contribution 'A new labwork course for physics students: devices, methods and research projects' by Knut Neumann and Manuela Welzel. The two main parts of the labwork course cover first experimental devices (e.g. multimeters, oscilloscopes, different sensors, operational amplifiers, step motors, AD/DA-converters). Then subjects such as data processing, consideration of measurement uncertainties, keeping records or using tools like LABVIEW etc are focused on. Another concrete proposal for a new curriculum is provided by James Sharp et al, in 'Computer based learning in an undergraduate physics laboratory: interfacing and instrument control using MATLAB'. One can well imagine that project labs

  19. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem...

  20. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...

  1. Design of the Balance@Work project: systematic development, evaluation and implementation of an occupational health guideline aimed at the prevention of weight gain among employees

    Directory of Open Access Journals (Sweden)

    Weel Andre NH

    2009-12-01

    Full Text Available Abstract Background Occupational health professionals may play an important role in preventive health promotion activities for employees. However, due to a lack of knowledge and evidence- and practice based methods and strategies, interventions are hardly being implemented by occupational physicians to date. The aim of the Balance@Work project is to develop, evaluate, and implement an occupational health guideline aimed at the prevention of weight gain among employees. Methods Following the guideline development protocol of the Netherlands Society of Occupational Medicine and the Intervention Mapping protocol, the guideline was developed based on literature, interviews with relevant stakeholders, and consensus among an expert group. The guideline consists of an individual and an environmental component. The individual component includes recommendations for occupational physicians on how to promote physical activity and healthy dietary behavior based on principles of motivational interviewing. The environmental component contains an obesogenic environment assessment tool. The guideline is evaluated in a randomised controlled trial among 20 occupational physicians. Occupational physicians in the intervention group apply the guideline to eligible workers during 6 months. Occupational physicians in the control group provide care as usual. Measurements take place at baseline and 6, 12, and 18 months thereafter. Primary outcome measures include waist circumference, daily physical activity and dietary behavior. Secondary outcome measures include sedentary behavior, determinants of behavior change, body weight and body mass index, cardiovascular disease risk profile, and quality of life. Additionally, productivity, absenteeism, and cost-effectiveness are assessed. Discussion Improving workers' daily physical activity and dietary behavior may prevent weight gain and subsequently improve workers' health, increase productivity, and reduce absenteeism

  2. Design of the Balance@Work project: systematic development, evaluation and implementation of an occupational health guideline aimed at the prevention of weight gain among employees.

    Science.gov (United States)

    Verweij, Lisanne M; Proper, Karin I; Weel, Andre N H; Hulshof, Carel T J; van Mechelen, Willem

    2009-12-14

    Occupational health professionals may play an important role in preventive health promotion activities for employees. However, due to a lack of knowledge and evidence- and practice based methods and strategies, interventions are hardly being implemented by occupational physicians to date. The aim of the Balance@Work project is to develop, evaluate, and implement an occupational health guideline aimed at the prevention of weight gain among employees. Following the guideline development protocol of the Netherlands Society of Occupational Medicine and the Intervention Mapping protocol, the guideline was developed based on literature, interviews with relevant stakeholders, and consensus among an expert group. The guideline consists of an individual and an environmental component. The individual component includes recommendations for occupational physicians on how to promote physical activity and healthy dietary behavior based on principles of motivational interviewing. The environmental component contains an obesogenic environment assessment tool. The guideline is evaluated in a randomised controlled trial among 20 occupational physicians. Occupational physicians in the intervention group apply the guideline to eligible workers during 6 months. Occupational physicians in the control group provide care as usual. Measurements take place at baseline and 6, 12, and 18 months thereafter. Primary outcome measures include waist circumference, daily physical activity and dietary behavior. Secondary outcome measures include sedentary behavior, determinants of behavior change, body weight and body mass index, cardiovascular disease risk profile, and quality of life. Additionally, productivity, absenteeism, and cost-effectiveness are assessed. Improving workers' daily physical activity and dietary behavior may prevent weight gain and subsequently improve workers' health, increase productivity, and reduce absenteeism. After an effect- and process evaluation the guideline will be

  3. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  4. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  5. Downplaying model power in IT project work

    DEFF Research Database (Denmark)

    Richter, Anne; Buhl, Henrik

    2004-01-01

    in the research, presented in this article, conducted in a Danish manufacturing company, is how an IT system could be configured to support shopfloor teamwork and enhance the quality of work. The approach is based on participatory design and the concept of "model power". This concept facilitates an understanding...

  6. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  7. Overview of the ACEX project iodine work

    International Nuclear Information System (INIS)

    Merilo, M.

    1996-01-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. The results of this work are expected to identify where additional data

  8. Working across Boundaries in Design

    DEFF Research Database (Denmark)

    Clausen, Christian; Yoshinaka, Yutaka

    The paper addresses how insights from the social shaping tradition and political process theory may contribute to an understanding of design as staging of sociotechnical relations and processes cutting across boundaries of diverse organisational, political and knowledge domains. This idea is purs...... organisational practices. One implication of this approach includes an attention towards what (and how) ar-eas may be rendered open to negotiation and transformation in technological design, implementation, and change processes....

  9. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  10. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  11. Design Collaboration and Team Working

    NARCIS (Netherlands)

    Quanjel, E.M.C.J.; Zeiler, W.; Bauer, M.; Lima, C.

    2007-01-01

    "One of the core problems within construction industry is knowledge exchange between the different participants during the design- and engineering process (Lechner 1991, Cross 1992, Reymen 2001, van Aken 2005). To link the parts of the knowledge-triangle practice, education and research forms the

  12. Design collaboration and team working

    NARCIS (Netherlands)

    Quanjel, E.M.C.J.; Zeiler, W.

    2007-01-01

    "One of the core problems within construction industry is knowledge exchange between the different participants during the design- and engineering process (Lechner 1991, Cross 1992, Reymen 2001, van Aken 2005). To link the parts of the knowledge-triangle practice, education and research forms the

  13. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    experiences and expertise to guide the students’ decisions in relation to the design project. This paper focuses on project supervision in the context of design education – and more specifically on how this supervision is unfolded in a Problem Based Learning culture. The paper explores the supervisor......’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop......In design there is a long tradition for apprenticeship, as well as tradition for learning through design projects. Today many design educations are positioned within the University context, and have to be aligned with the learning culture and structure, which they represent. This raises a specific...

  14. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... and the Aarhus School of Business, University of Aarhus, Denmark. The analysis demonstrates the potential of knowledge communication concepts for social technical design and highlights the cultural context of the designers as a key factor to consider in socio-technical design....

  15. UMTRA project: Canonsburg final design

    International Nuclear Information System (INIS)

    Thiers, G.R.; Guros, F.B.; Smith, E.S.

    1984-01-01

    Final design for on-site stabilization of over 300,000 cubic yards of abandoned mill tailings in Canonsburg, Pennsylvania, is being completed this Fall. This paper describes design criteria, design procedures, and difficulties encountered for the following required elements: 1. Encapsulation cell; 2. Durability of erosion protection material; 3. Flood control berm; 4. Sedimentation pond; 5. Wastewater treatment plant. The 70,000 cubic yards of the tailings for which radiation levels exceed 100 picocuries per gram will be placed on a 2-ft-thick compacted clay liner and encased by a 3-ft-thick compacted clay cover. The remaining tailings will be covered with at least two feet of clay to prevent radon escape and to reduce rainfall infiltration. Erosion protection will be provided for the encapsulation cell, the drainage swales, and from potential meandering of nearby Chartiers Creek

  16. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    between knowledge and technology through knowledge communication processes, cultural and rhetorical contexts. This connection is examined from a process point of view through the development of project goals and objectives to situate technology. The data comes from a Project Management course in which...... the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...... the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication. Keywords: Knowledge Communication, Knowledge Management, Socio-Technical Design, Project Management....

  17. Design of the DISCovery project: tailored work-oriented interventions to improve employee health, well-being, and performance-related outcomes in hospital care

    OpenAIRE

    Niks Irene MW; de Jonge Jan; Gevers Josette MP; Houtman Irene LD

    2013-01-01

    Abstract Background It is well-known that health care workers in today’s general hospitals have to deal with high levels of job demands, which could have negative effects on their health, well-being, and job performance. A way to reduce job-related stress reactions and to optimize positive work-related outcomes is to raise the level of specific job resources and opportunities to recover from work. However, the question remains how to translate the optimization of the balance between job deman...

  18. Design of the DISCovery project: Tailored work-oriented interventions to improve employee health, well-being, and performance-related outcomes in hospital care

    NARCIS (Netherlands)

    Niks, I.M.W.; Jonge, J. de; Gevers, J.M.P; Houtman, I.L.D.

    2013-01-01

    Background: It is well-known that health care workers in today's general hospitals have to deal with high levels of job demands, which could have negative effects on their health, well-being, and job performance. A way to reduce job-related stress reactions and to optimize positive work-related

  19. Design of the DISCovery project : tailored work-oriented interventions to improve employee health, well-being and performance-related outcomes in hospital care.

    NARCIS (Netherlands)

    Niks, I.M.W.; Jonge, de J.; Gevers, J.M.P.; Houtman, I.L.D.

    2013-01-01

    Background It is well-known that health care workers in today’s general hospitals have to deal with high levels of job demands, which could have negative effects on their health, well-being, and job performance. A way to reduce job-related stress reactions and to optimize positive work-related

  20. Overview of the ACEX project iodine work

    Energy Technology Data Exchange (ETDEWEB)

    Merilo, M

    1996-12-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. (Abstract Truncated)

  1. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  2. Legacy material work-off project

    International Nuclear Information System (INIS)

    Sloan, T.J.; Baker, D.H. IV

    1999-01-01

    Los Alamos National Laboratory (LANL) and its subcontractors recently completed a nine-month legacy material clean-up effort. Legacy materials were defined as chemicals, hazardous, non-hazardous, and both hazardous and radioactive (mixed), that no longer served a programmatic use and had no identified individual owner within the Laboratory. Once personnel identified the legacy materials, the items were transferred to Solid Waste Operation's (EM-SWO) control. Upon completing this process, the responsible division-level manager was required to certify that all non-radioactive hazardous and non-hazardous materials and acceptable mixed legacy materials had been identified and transferred to EM-SWO for proper handling or disposal. The major expense in this project was the cost of actual chemical and radiological analysis. This expense was the result of items not having an identified individual owner. The major benefit of this project is that LANL is now in an excellent position to implement its Integrated Safety Management (ISM) Plan, which requires the implementation of safe work practices, including requirements for removing unused items when vacating workspaces. Effective implementation of ISM will go a long way toward ensuring that legacy materials are no longer an issue at the Laboratory

  3. Themes in human work interaction design

    DEFF Research Database (Denmark)

    Ørngreen, Rikke; Mark Pejtersen, Annelise; Clemmensen, Torkil

    2008-01-01

    Design (name HWID) through the last two and half years since the commencement of this Working Group. The paper thus provides an introduction to the theory and empirical evidence that lie behind the combination of empirical work studies and interaction design. It also recommends key topics for future......Abstract. This paper raises themes that are seen as some of the challenges facing the emerging practice and research field of Human Work Interaction Design. The paper has its offset in the discussions and writings that have been dominant within the IFIP Working Group on Human Work Interaction...

  4. Working Inside for Smoking Elimination (Project W.I.S.E. study design and rationale to prevent return to smoking after release from a smoke free prison

    Directory of Open Access Journals (Sweden)

    Mello Jennifer

    2011-10-01

    Full Text Available Abstract Background Incarcerated individuals suffer disproportionately from the health effects of tobacco smoking due to the high smoking prevalence in this population. In addition there is an over-representation of ethnic and racial minorities, impoverished individuals, and those with mental health and drug addictions in prisons. Increasingly, prisons across the U.S. are becoming smoke free. However, relapse to smoking is common upon release from prison, approaching 90% within a few weeks. No evidence based treatments currently exist to assist individuals to remain abstinent after a period of prolonged, forced abstinence. Methods/Design This paper describes the design and rationale of a randomized clinical trial to enhance smoking abstinence rates among individuals following release from a tobacco free prison. The intervention is six weekly sessions of motivational interviewing and cognitive behavioral therapy initiated approximately six weeks prior to release from prison. The control group views six time matched videos weekly starting about six weeks prior to release. Assessments take place in-person 3 weeks after release and then for non-smokers every 3 months up to 12 months. Smoking status is confirmed by urine cotinine. Discussion Effective interventions are greatly needed to assist these individuals to remain smoke free and reduce health disparities among this socially and economically challenged group. Trial Registration NCT01122589

  5. Systematic design for trait introgression projects.

    Science.gov (United States)

    Cameron, John N; Han, Ye; Wang, Lizhi; Beavis, William D

    2017-10-01

    Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into Pareto optimality plots associated with any arbitrary selection strategy. The Pareto plots can be used to make rational decisions concerning the trade-offs between maximizing the probability of success while minimizing costs and time. The systematic rigor associated with a cost, time and probability of success (CTP) framework is well suited to designing TI projects that require dynamic decision making. The CTP framework also revealed that previously identified 'best' strategies can be improved to be at least twice as effective without increasing time or expenses.

  6. GIS Project Design: Brainstorming & Ideation Workshop

    OpenAIRE

    Garofalo, Frank

    2015-01-01

    Who should attend: Do you have a new project or existing project, and looking to generate some new ideas? Come with a project in mind or just come to learn some new collaboration and brainstorming techniques. What participants will learn… techniques for: Working with others to create a common direction and vision, then generating alignment Evaluating current state situations, strengths, complications and implications Identifying and forming consensus on key target audiences Generating ide...

  7. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  8. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  9. Work Design Influences: A Synthesis of Multi-Level Factors that Affect The Design of Work

    OpenAIRE

    Parker, Sharon; Van den Broeck, Anja; Holman, David

    2017-01-01

    High quality work design is a key determinant of employee well-being, positive work attitudes, and job/organizational performance. Yet many job incumbents continue to experience deskilled and demotivating work. We argue that there is a need to understand better where work designs come from. We review research that investigates the factors that influence work design, noting that this research is only a small fragment of the work design literature. The research base is also rather disparate, sp...

  10. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  11. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  12. Participatory simulation in hospital work system design

    DEFF Research Database (Denmark)

    Andersen, Simone Nyholm

    When ergonomic considerations are integrated into the design of work systems, both overall system performance and employee well-being improve. A central part of integrating ergonomics in work system design is to benefit from emplo y-ees’ knowledge of existing work systems. Participatory simulation...... (PS) is a method to access employee knowledge; namely employees are involved in the simulation and design of their own future work systems through the exploration of models representing work system designs. However, only a few studies have investigated PS and the elements of the method. Yet...... understanding the elements is essential when analyzing and planning PS in research and practice. This PhD study investigates PS and the method elements in the context of the Danish hospital sector, where PS is applied in the renewal and design of public hospitals and the work systems within the hospitals...

  13. Learning from participatory design projects across industries

    DEFF Research Database (Denmark)

    Broberg, Ole; Souza da Conceição, Carolina

    2017-01-01

    Summative Statement: A preliminary framework for participatory design projects (PDP) was developed based on a retrospective analysis of five PDPs across different industries. The framework may serve as a guidance for planning and conducting PDPs. Problem statement: A growing number of experiences...... with participatory design or participatory ergonomics projects have been gained within the field of macro-ergonomics. It is suggested that the Participatory Ergonomics Framework (PEF) validated by Haines et al. (2002) needs to be updated based on these experiences and hence more focussed on design activities....... Research Objective / Question: The objective of this study was to update and design-orient the PEF based on experiences with PDPs within the last ten years. Methodology: Five participatory design projects across different industries were systematically analyzed and compared in order to develop a framework...

  14. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  15. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  16. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  17. Human work interaction design meets international development

    DEFF Research Database (Denmark)

    Campos, P.; Clemmensen, T.; Barricelli, B.R.

    2017-01-01

    opportunity to observe technology-mediated innovative work practices in informal settings that may be related to the notion of International Development. In this unique context, this workshop proposes to analyze findings related to opportunities for design research in this type of work domains: a) human......Over the last decade, empirical relationships between work domain analysis and HCI design have been identified by much research in the field of Human Work Interaction Design (HWID) across five continents. Since this workshop takes place at the Interact Conference in Mumbai, there is a unique...

  18. ASSESSMENT OF WORK-SPACE AND WORK-METHOD DESIGNS ...

    African Journals Online (AJOL)

    related injuries among its workforce. This research assessed work-space (WsD) and work-method designs (WmD), level of compliance with recommended standards (RSs) and effects on workers' wellbeing. Clearances for services in 55 supine ...

  19. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  20. Capstone Engineering Design Projects for Community Colleges

    Science.gov (United States)

    Walz, Kenneth A.; Christian, Jon R.

    2017-01-01

    Capstone engineering design courses have been a feature at research universities and four-year schools for many years. Although such classes are less common at two-year colleges, the experience is equally beneficial for this population of students. With this in mind, Madison College introduced a project-based Engineering Design course in 2007.…

  1. Modeling and Simulation for Mission Operations Work System Design

    Science.gov (United States)

    Sierhuis, Maarten; Clancey, William J.; Seah, Chin; Trimble, Jay P.; Sims, Michael H.

    2003-01-01

    Work System analysis and design is complex and non-deterministic. In this paper we describe Brahms, a multiagent modeling and simulation environment for designing complex interactions in human-machine systems. Brahms was originally conceived as a business process design tool that simulates work practices, including social systems of work. We describe our modeling and simulation method for mission operations work systems design, based on a research case study in which we used Brahms to design mission operations for a proposed discovery mission to the Moon. We then describe the results of an actual method application project-the Brahms Mars Exploration Rover. Space mission operations are similar to operations of traditional organizations; we show that the application of Brahms for space mission operations design is relevant and transferable to other types of business processes in organizations.

  2. Human Work Interaction Design. Work Analysis and HCI

    DEFF Research Database (Denmark)

    Paasch, Kasper

    2013-01-01

    . The papers reflect many different areas and address many complex and diverse work domains, ranging from medical user interfaces, work and speech interactions at elderly care facilities, greenhouse climate control, navigating through large oil industry engineering models, crisis management, library usability......This book constitutes the thoroughly refereed post-conference proceedings of the Third IFIP WG 13.6 Working Conference on Human Work Interaction Design, HWID 2012, held in Copenhagen, Denmark, in December 2012. The 16 revised papers presented were carefully selected for inclusion in this volume...

  3. Working with human values in design

    DEFF Research Database (Denmark)

    Iversen, Ole Sejer; Leong, Tuck Wah; Bowker, Geoffrey C.

    2012-01-01

    . This workshop seeks to bring expertise from different perspectives on design to explore theoretical, methodological, and relational issues when working with values in design. The aim is to better conceptualize, understand and establish ways we can work more systematically and productively with human values......A survey of the literature confirms that engaging with human values when designing technology is an important undertaking. However, despite these efforts, there is still considerable divergence and a lack of agreement in how we conceptualize and approach values during technology design...

  4. Working with human values in design

    DEFF Research Database (Denmark)

    Iversen, Ole Sejer; Leong, Tuck Wah; Bowker, Geoffrey C.

    2012-01-01

    A survey of the literature confirms that engaging with human values when designing technology is an important undertaking. However, despite these efforts, there is still considerable divergence and a lack of agreement in how we conceptualize and approach values during technology design....... This workshop seeks to bring expertise from different perspectives on design to explore theoretical, methodological, and relational issues when working with values in design. The aim is to better conceptualize, understand and establish ways we can work more systematically and productively with human values...

  5. Specifications in early conceptual design work

    DEFF Research Database (Denmark)

    Hansen, Claus Thorp; Andreasen, Mogens Myrup

    2007-01-01

    In early conceptual design the design team is working in an uncertain situation, where the understanding of a need is limited and not much is known about the solution space. In this situation the design team has to both analyse need and explore solution space. Thus, the team has to formulate design...... specifications, which express attractive product goals, and has to synthesise the product idea. The authors of this paper see a challenge to enhance and improve our understanding of the nature of design specifications as a means to support the synthesis of a product idea. In this empirical study we analyse...... the structure and content of design specifications during early ideation activities, where initial design specifications are formulated and a product idea is synthesised. We have analysed specification documents of 19 teams of novice designers. Our analysis indicates that a productive product design...

  6. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  7. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  8. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  9. Design tools and materials in creative work

    DEFF Research Database (Denmark)

    Hansen, Nicolai Brodersen; Dalsgaard, Peter; Halskov, Kim

    2017-01-01

    -oriented perspectives, we wish to examine the potentials and limitations in current uses of design tools and materials, and discuss and explore when and how we can introduce ones. Participation in the workshop requires participants to document and analyse central themes in a case, and the resulting material will serve......This workshop aims to examine and discuss the role and nature of design tools and materials in creative work, and to explore how novel tools can meaningfully combine existing and novel tools to support and augment creative work. By exploring and combining methodological, theoretical, and design...

  10. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  11. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  12. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  13. An Architecture Design Project: "Building" Understanding

    Science.gov (United States)

    Bush, Sarah B.; Albanese, Judith; Karp, Karen S.; Karp, Matthew

    2017-01-01

    Middle school students need relevant, meaningful contexts to apply emerging mathematical ideas. In this project, through the context of an architecture investigation, seventh-grade students engaged in mathematics involving area, surface area, volume, ratios and proportional thinking, number sense, and technology integration. Students, working in…

  14. Project SEED. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2012

    2012-01-01

    "Project SEED" is a supplemental mathematics program for low-achieving students in grades 3 through 8 and is intended to prepare students to be successful in high school and college math. Based on the Socratic method, instruction is delivered through a series of questions to the class. In addition to individual responses, the instructor…

  15. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  16. Interactive Room Support for Complex and Distributed Design Projects

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Gundersen, Kristian Kroyer; Mogensen, Preben Holst

    2001-01-01

    We are investigating the design of digital 3D interaction technology embedded in a physical environment. We take as point of departure cemplex, collaborative industrial design projects involving heterogeneous sets of documents, and physical as well as digital 3D models. The paper introduces our...... interaction devices being experimented with in the interactive room environment. The interactive room technologies have all been designed with the requirement that they must seamlessly integrate both into the physical and into the digital work environment while providing new affordances for industrial design...

  17. Structural elements design manual working with Eurocodes

    CERN Document Server

    Draycott, Trevor

    2009-01-01

    Structural Elements Design Manual: Working With Eurocodes is the structural engineers 'companion volume' to the four Eurocodes on the structural use of timber, concrete, masonry and steelwork. For the student at higher technician or first degree level it provides a single source of information on the behaviour and practical design of the main elements of the building structure. With plenty of worked examples and diagrams, it is a useful textbook not only for students of structural and civil engineering, but also for those on courses in related subjects such as

  18. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  19. Design of the Bottom-up Innovation project--a participatory, primary preventive, organizational level intervention on work-related stress and well-being for workers in Dutch vocational education.

    Science.gov (United States)

    Schelvis, Roosmarijn M C; Oude Hengel, Karen M; Wiezer, Noortje M; Blatter, Birgitte M; van Genabeek, Joost A G M; Bohlmeijer, Ernst T; van der Beek, Allard J

    2013-08-15

    In the educational sector job demands have intensified, while job resources remained the same. A prolonged disbalance between demands and resources contributes to lowered vitality and heightened need for recovery, eventually resulting in burnout, sickness absence and retention problems. Until now stress management interventions in education focused mostly on strengthening the individual capacity to cope with stress, instead of altering the sources of stress at work at the organizational level. These interventions have been only partly effective in influencing burnout and well-being. Therefore, the "Bottom-up Innovation" project tests a two-phased participatory, primary preventive organizational level intervention (i.e. a participatory action approach) that targets and engages all workers in the primary process of schools. It is hypothesized that participating in the project results in increased occupational self-efficacy and organizational efficacy. The central research question: is an organization focused stress management intervention based on participatory action effective in reducing the need for recovery and enhancing vitality in school employees in comparison to business as usual? The study is designed as a controlled trial with mixed methods and three measurement moments: baseline (quantitative measures), six months and 18 months (quantitative and qualitative measures). At first follow-up short term effects of taking part in the needs assessment (phase 1) will be determined. At second follow-up the long term effects of taking part in the needs assessment will be determined as well as the effects of implemented tailored workplace solutions (phase 2). A process evaluation based on quantitative and qualitative data will shed light on whether, how and why the intervention (does not) work(s). "Bottom-up Innovation" is a combined effort of the educational sector, intervention providers and researchers. Results will provide insight into (1) the relation between

  20. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  1. Adolescent Sexual Education: Designing Curriculum That Works

    Science.gov (United States)

    Quincy, Michael L.

    2009-01-01

    The purpose of this review paper, "Adolescent Sexual Education: Designing Curriculum That Works", is to present some basic curriculum necessities for developing an in-school sexual education program that results in decreasing the number of teenagers initiating sex, thus reducing the number of teen pregnancies and cases of sexually transmitted…

  2. Project Work in Social Biology at GCE Advanced Level

    Science.gov (United States)

    Gadd, P.; Smith, S. Tyrell

    1977-01-01

    The system by which projects are submitted, modified, and approved is outlined and an indication is given of the standards and quantity of work expected. Criteria on which assessment is based are explained, the range of individual studies is summarized, and cases for and against project work are given. (Author/AJ)

  3. Designing Work, Family & Health Organizational Change Initiatives.

    Science.gov (United States)

    Kossek, Ellen Ernst; Hammer, Leslie B; Kelly, Erin L; Moen, Phyllis

    2014-01-01

    For decades, leaders and scholars have been advocating change efforts to improve work-life relationships. Yet most initiatives have lacked rigor and not been developed using scientific principles. This has created an evidence gap for employer support of work and personal life as a win-win for productivity and employees' well-being. This paper examines the approach used by the U.S. Work Family Health Network (WFRN) to develop an innovative workplace intervention to improve employee and family health. The change initiative was designed to reduce organizationally based work-family conflict in two contrasting contexts representative of major segments of today's U.S. workforce: health care employees and informational technology professionals. The WFRN Intervention (called STAR) had three theoretically based change elements. They were: 1) increase job control over work time and schedule; 2) increase supervisor social support for family and job effectiveness; and 3) improve organizational culture and job design processes to foster results orientation. Seven practical lessons for developing work-life interventions emerged from this groundbreaking endeavor.

  4. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  5. Policy work as a reform project

    OpenAIRE

    Hal K. Colebatch

    2008-01-01

    One aspect of the modernization of liberal government in the late 20th century was an increased attention to policy, both as a concept for interrogating government, and as the basis for organizing work within government, leading to the development of ‘policy analysis’ as a decision tool. This paper reviews the development of specialised forms of ‘policy work’ in liberal western political systems in order to establish what can be learned by other sorts of polity, and in particular, the tran...

  6. Duplex Design Project: Science Pilot Test.

    Science.gov (United States)

    Center for Research on Evaluation, Standards, and Student Testing, Los Angeles, CA.

    Work is reported towards the completion of a prototype duplex-design assessment instrument for grade-12 science. The student course-background questionnaire and the pretest section of the two-stage instrument that was developed were administered to all 134 12th-grade students at St. Clairsville High School (Ohio). Based on the information obtained…

  7. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  8. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  9. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  10. Stirling cycle engines inner workings and design

    CERN Document Server

    Organ, Allan J

    2013-01-01

    Some 200 years after the original invention, internal design of a Stirling engine has come to be considered a specialist task, calling for extensive experience and for access to sophisticated computer modelling. The low parts-count of the type is negated by the complexity of the gas processes by which heat is converted to work. Design is perceived as problematic largely because those interactions are neither intuitively evident, nor capable of being made visible by laboratory experiment. There can be little doubt that the situation stands in the way of wider application of this elegant concep

  11. A series of student design projects for improving and modernizing safety helmets

    NARCIS (Netherlands)

    Beurden, van K.M.M. (Karin); Boer, de J. (Johannes); Stilma, M. (Margot); Teeuw, W.B. (Wouter)

    2014-01-01

    The Saxion Research Centre for Design and Technology employs many students during research projects. This paper discusses a series of student design projects on safety helmets in the Safety@Work project. At construction sites workers are required to wear personal protective equipment during their

  12. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  13. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  14. PROJECT ENGINEERING DATA MANAGEMENT AT AUTOMATED PREPARATION OF DESIGN DOCUMENTATION

    Directory of Open Access Journals (Sweden)

    A. V. Guryanov

    2017-01-01

    Full Text Available We have developed and realized instrumental means for automated support of end-to-end design process for design documentation on a product at the programming level. The proposed decision is based on processing of the engineering project data that are contained in interdependent design documents: tactical technical characteristics of products, data on the valuable metals contained in them, the list of components applied in a product and others. Processing of engineering data is based on their conversion to the form provided by requirements of industry standards for design documentation preparation. The general graph of the design documentation developed on a product is provided. The description of the developed software product is given. Automated preparation process of interdependent design documents is shown on the example of preparation of purchased products list. Results of work can be used in case of research and development activities on creation of perspective samples of ADP equipment.

  15. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  16. Work Breakdown Structures The Foundation for Project Management Excellence

    CERN Document Server

    Norman, Eric S; Fried, Robert T

    2011-01-01

    Understand and apply new concepts regarding Work Breakdown Structures The Work Breakdown Structure (WBS) has emerged as a foundational concept and tool in Project Management. It is an enabler that ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool. Created by the three experts who led the development of PMI's Practice Standard for Work Breakdown Structures, Second Edition, this much-needed text expands on what the standard covers and describes how to go about successfully implementing the WBS within the project life

  17. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  18. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  19. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  20. Why Phishing Works: Project for an Information Security Capstone Course

    Science.gov (United States)

    Pollacia, Lissa; Ding, Yan Zong; Yang, Seung

    2015-01-01

    This paper presents a project which was conducted in a capstone course in Information Security. The project focused on conducting research concerning the various aspects of phishing, such as why phishing works and who is more likely to be deceived by phishing. Students were guided through the process of conducting research: finding background and…

  1. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  2. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  3. 34 CFR 637.13 - What are design projects?

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.13 What are design projects? (a) Design... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13...

  4. Deep Help in Complex Project Work: Guiding and Path-Clearing Across Difficult Terrain

    OpenAIRE

    Fisher, Colin M.; Pillemer, Julianna; Amabile, Teresa M.

    2017-01-01

    How do teams working on complex projects get the help they need? Our qualitative investigation of the help provided to project teams at a prominent design firm revealed two distinct helping processes, both characterized by deep, sustained engagement that far exceeds the brief interactions described in the helping literature. Such deep help consisted of (1) guiding a team through a difficult juncture by working with its members in several prolonged, tightly clustered sessions, or (2) path-clea...

  5. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    2016-01-01

    Internationally, new pedagogical approaches emphasizing collaboration or learning in networks have been developed following the introduction of new technologies, especially the spread of social media. It is interesting to see such pedagogical developments in relation to similar approaches......, developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...... digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...

  6. Yucca Mountain Project Subsurface Facilities Design

    International Nuclear Information System (INIS)

    Linden, A.; Saunders, R.S.; Boutin, R.J.; Harrington, P.G.; Lachman, K.D.; Trautner, L.J.

    2002-01-01

    Four units of the Topopah Springs formation (volcanic tuff) are considered for the proposed repository: the upper lithophysal, the middle non-lithophysal, the lower lithophysal, and the lower non-lithophysal. Yucca Mountain was recently designated the site for a proposed repository to dispose of spent nuclear fuel and high-level radioactive waste. Work is proceeding to advance the design of subsurface facilities to accommodate emplacing waste packages in the proposed repository. This paper summarized recent progress in the design of subsurface layout of the proposed repository. The original Site Recommendation (SR) concept for the subsurface design located the repository largely within the lower lithophysal zone (approximately 73%) of the Topopah The Site Recommendation characterized area suitable for emplacement consisted of the primary upper block, the lower block and the southern upper block extension. The primary upper block accommodated the mandated 70,000 metric tons of heavy metal (MTHM) at a 1.45 kW/m hear heat load. Based on further study of the Site Recommendation concept, the proposed repository siting area footprint was modified to make maximum use of available site characterization data, and thus, reduce uncertainties associated with performance assessment. As a result of this study, a modified repository footprint has been proposed and is presently being review for acceptance by the DOE. A panel design concept was developed to reduce overall costs and reduce the overall emplacement schedule. This concept provides flexibility to adjust the proposed repository subsurface layout with time, as it makes it unnecessary to ''commit'' to development of a large single panel at the earliest stages of construction. A description of the underground layout configuration and influencing factors that affect the layout configuration are discussed in the report

  7. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  8. Virtual teamwork - Panoptic or Interactive Work design

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard

    2012-01-01

    The emergence of virtual teamwork represents a dynamic response to globalization, the growth of communication technologies and dismantling of industrial based organizational hierarchies. These developments pose new challenges as the completion of the distributed tasks must be integrated across th...... the barriers of cultural differences, and with fewer face-to-face clues, Virtual teamwork involves demands regarding communication, trust and knowledge. The implications for future work design are immense, and still open for clarification and discussion.......The emergence of virtual teamwork represents a dynamic response to globalization, the growth of communication technologies and dismantling of industrial based organizational hierarchies. These developments pose new challenges as the completion of the distributed tasks must be integrated across...

  9. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  10. Industrial Sponsor Perspective on Leveraging Capstone Design Projects to Enhance Their Business

    Science.gov (United States)

    Weissbach, Robert S.; Snyder, Joseph W.; Evans, Edward R., Jr.; Carucci, James R., Jr.

    2017-01-01

    Capstone design projects have become commonplace among engineering and engineering technology programs. These projects are valuable tools when assessing students, as they require students to work in teams, communicate effectively, and demonstrate technical competency. The use of industrial sponsors enhances these projects by giving these projects…

  11. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  12. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  13. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    Science.gov (United States)

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  14. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  15. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  16. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  17. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  18. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  19. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  20. Decommissioning Work Modeling System for Nuclear Facility Decommissioning Design

    International Nuclear Information System (INIS)

    Park, S. K.; Cho, W. H.; Choi, Y. D.; Moon, J. K.

    2012-01-01

    During the decommissioning activities of the KRR-1 and 2 (Korea Research Reactor 1 and 2) and UCP (Uranium Conversion Plant), all information and data, which generated from the decommissioning project, were record, input and managed at the DECOMMIS (DECOMMissioning Information management System). This system was developed for the inputting and management of the data and information of the man-power consumption, operation time of the dismantling equipment, the activities of the radiation control, dismantled waste management and Q/A activities. When a decommissioning is planed for a nuclear facility, an investigation into the characterization of the nuclear facility is first required. The results of such an investigation are used for calculating the quantities of dismantled waste volume and estimating the cost of the decommissioning project. That is why, the DEFACS (DEcommissioning FAcility Characterization DB System) was established for the management of the facility characterization data. The DEWOCS (DEcommissioning WOrk-unit productivity Calculation System) was developed for the calculation of the workability on the decommissioning activities. The work-unit productivities are calculated through this system using the data from the two systems, DECOMMIS and DEFACS. This result, the factors of the decommissioning work-unit productivities, will be useful for the other nuclear facility decommissioning planning and engineering. For this, to set up the items and plan for the decommissioning of the new objective facility, the DEMOS (DEcommissioning work Modeling System) was developed. This system is for the evaluation the cost, man-power consumption of workers and project staffs and technology application time. The factor of the work-unit productivities from the DEWOCS and governmental labor cost DB and equipment rental fee DB were used for the calculation the result of the DEMOS. And also, for the total system, DES (Decommissioning Engineering System), which is now

  1. The Design of Project Management Structural Organization

    OpenAIRE

    Dumitru Constantinescu; Cristian Etegan

    2007-01-01

    The relationships organization-suppliers-customers have recently known major changes in the structure of services and have made the organization develop its managerial and professional competencies in order to do projects. The qualified organization is the most trust-worthy in the process of doing a project. The participation of an organization in doing projects depends on a multitude of factors. Out of these factors, the structural organization comes forth, as it represents the variable with...

  2. Project Read[R] Phonology. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2010

    2010-01-01

    "Project Read"[R] is a multisensory language arts curriculum designed for use in a classroom or group setting. Two main objectives of the program are to use language in all its forms, and to use responsive instruction rather than preplanned textbook lessons. The program emphasizes direct instruction, and lessons move from letter-sounds…

  3. Collaborative Writing to Enhance Academic Writing Development through Project Work

    Science.gov (United States)

    Robayo Lun, Alma Milena; Hernandez Ortiz, Luz Stella

    2013-01-01

    Advanced students at university level struggle with many aspects of academic writing in English as a foreign language. The purpose of this article is to report on an investigation aimed at analyzing what collaborative writing through project work tells us about students' academic writing development at the tertiary level. The compositions written…

  4. Senate works: law project on the energy policy (first reading)

    International Nuclear Information System (INIS)

    2004-01-01

    This synthesis of the Senate works on the law project on the energy policy, comments each article of the law text. It concerns: the energy demand control, the renewable energies, the equilibrium and the quality of the transport and distribution networks of electric power, taxation and financial incentives. (A.L.B.)

  5. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  6. Time, Place and Identity in Project Work on the Net

    DEFF Research Database (Denmark)

    Heilesen, Simon; Jensen, Sisse Siggaard

    2005-01-01

    This chapter identifies some of the fundamental conditions and factors that affect collaborative project work on the Net. Understanding them is fundamental to developing key qualities in Net-based collaborative learning such as confidence, reliability, and trust. We argue that: (1) Collaboration...... of Computer-Mediated Communication program at Roskilde University, Denmark....

  7. Oil field rejuvenation work starts at 14 project sites

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  8. Do Computerised Training Programmes Designed to Improve Working Memory Work?

    Science.gov (United States)

    Apter, Brian J. B.

    2012-01-01

    A critical review of working memory training research during the last 10 years is provided. Particular attention is given to research that has attempted to investigate the efficacy of commercially marketed computerised training programmes such as "Cogmed" and "Jungle Memory". Claimed benefits are questioned on the basis that research methodologies…

  9. The surface physics work station: final design

    International Nuclear Information System (INIS)

    Landers, R.; Kleiman, G.G.; Castro, S.G.C. de; Douglas, R.A.; Nascente, P.A.P.

    1996-01-01

    Thanks to funding from FAPESP we will be installing in the beginning of 1997 a work station for electron spectroscopy designed for the study of clean solid surfaces and the modification of these surfaces by deposition in situ of ultra thin metallic films. The main analytical tool will be a high resolution hemispherical analyzer made by VSW-Omicrom (EA 125 HR) which is capable of better than 5 meV resolution and high transmission due to its five channeltron multi detection system. The system will also have a Rear View LEED Optics for single crystal studies. The system will be housed in a 16'' cylindrical chamber with mu metal magnetic shielding having two levels for analysis. The upper level will contain instruments for technique which do not require photons such as LEED and sample cleaning. The lower level will have the electron analyzer, conventional X-ray source (Al/Mg), electron gun for Auger, e-beam evaporators for thin film deposition and ports for the future addition of different detectors. We will have a manipulator with 5 degrees of freedom (thre translation and two rotational) and sample heating and LN cooling. Finally we will have a fast entry/preparation chamber. The pumping system will have a combination of turbomolecular and ion pumps for the main chamber and a turbo for the fast entr/prep chamber. The system will be used initially for the study of surface alloys by XPS and Photoelectron Diffraction but as soon as it is properly characterized it will be open for collaborations with other groups interested in using its capabilities. (author)

  10. CRITICAL TEACHING WORK AS DIMENSION OF UNIVERSITY PROJECT

    Directory of Open Access Journals (Sweden)

    Roberto Leher

    2014-06-01

    Full Text Available The article analyzes the heteronomy of academic work in Brazil, particularly public higher education. It discusses the meaning of rupture of the national-developmentalist project by the irruption of the corporate-military coup and the combined process of coercion (AI-5/1968 and Decree 477/1969 and of the subordination of research and postgraduate studies to monopolistic capitalism in counterreformation of 1968, through programs to encourage science and technology geared to the concerns of bourgeois fractions that sustained the regime. Facing the processes of dispossession and alienation of academic work in the dictatorship, the study examines the organization of teaching movement, its first strikes and the centrality given to career university project of ANDES. Finally, it presents as deepening the dependent capitalism over the last three decades reoriented public university and private higher education, indicating effects on teaching work and the struggles for affirmation of the public sphere as antimercantile.

  11. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  12. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  13. Updated Design Standards and Guidance from the What Works Clearinghouse: Regression Discontinuity Designs and Cluster Designs

    Science.gov (United States)

    Cole, Russell; Deke, John; Seftor, Neil

    2016-01-01

    The What Works Clearinghouse (WWC) maintains design standards to identify rigorous, internally valid education research. As education researchers advance new methodologies, the WWC must revise its standards to include an assessment of the new designs. Recently, the WWC has revised standards for two emerging study designs: regression discontinuity…

  14. Report of the Working Design Group

    Science.gov (United States)

    1992-01-01

    The engineering study group in the LOUISA workshop was responsible for producing a preliminary general design for an optical synthetic aperture telescope on the Moon. This design is intended to be a test case for focusing continuing design studies. The scope of the design included consideration of the array geometry, individual telescopes, metrology, site attributes, and construction. However, no attempt was made to go into further depth in the design than to cover the essential characteristics of the instrument. The starting point for the array design was the lunar optical array discussed by Burke (1985). His array geometry followed the design and correlation procedure of the 27-element Very Large Array (VLA) radio telescopes near Socorro, New Mexico.

  15. Concept and design of a virtual reality work environment for industrial designers; Konzeption und Entwurf eines VR Arbeitsplatzes im Bereich des Industrial Design

    Energy Technology Data Exchange (ETDEWEB)

    Hofmann, T.; Bruder, R. [Universitaet Essen (Germany). Institut fuer Ergonomie und Designforschung

    2002-07-01

    This concept of a working environment for industrial designers is based on the use of Virtual Reality. The project aims at making the design process using new technologies just as intuitive as the work involving traditional tools. Basis of the development is a human centered principle, not the concentration on available technologies. The project was developed in cooperation with the Fraunhofer Gesellschaft (Institute for media communication) in Sankt Augustin, Germany. (orig.)

  16. The Iterative Design Process in Research and Development: A Work Experience Paper

    Science.gov (United States)

    Sullivan, George F. III

    2013-01-01

    The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.

  17. Diagnosis, monitoring and prevention of exposure-related non-communicable diseases in the living and working environment: DiMoPEx-project is designed to determine the impacts of environmental exposure on human health.

    Science.gov (United States)

    Budnik, Lygia Therese; Adam, Balazs; Albin, Maria; Banelli, Barbara; Baur, Xaver; Belpoggi, Fiorella; Bolognesi, Claudia; Broberg, Karin; Gustavsson, Per; Göen, Thomas; Fischer, Axel; Jarosinska, Dorota; Manservisi, Fabiana; O'Kennedy, Richard; Øvrevik, Johan; Paunovic, Elizabet; Ritz, Beate; Scheepers, Paul T J; Schlünssen, Vivi; Schwarzenbach, Heidi; Schwarze, Per E; Sheils, Orla; Sigsgaard, Torben; Van Damme, Karel; Casteleyn, Ludwine

    2018-01-01

    The WHO has ranked environmental hazardous exposures in the living and working environment among the top risk factors for chronic disease mortality. Worldwide, about 40 million people die each year from noncommunicable diseases (NCDs) including cancer, diabetes, and chronic cardiovascular, neurological and lung diseases. The exposure to ambient pollution in the living and working environment is exacerbated by individual susceptibilities and lifestyle-driven factors to produce complex and complicated NCD etiologies. Research addressing the links between environmental exposure and disease prevalence is key for prevention of the pandemic increase in NCD morbidity and mortality. However, the long latency, the chronic course of some diseases and the necessity to address cumulative exposures over very long periods does mean that it is often difficult to identify causal environmental exposures. EU-funded COST Action DiMoPEx is developing new concepts for a better understanding of health-environment (including gene-environment) interactions in the etiology of NCDs. The overarching idea is to teach and train scientists and physicians to learn how to include efficient and valid exposure assessments in their research and in their clinical practice in current and future cooperative projects. DiMoPEx partners have identified some of the emerging research needs, which include the lack of evidence-based exposure data and the need for human-equivalent animal models mirroring human lifespan and low-dose cumulative exposures. Utilizing an interdisciplinary approach incorporating seven working groups, DiMoPEx will focus on aspects of air pollution with particulate matter including dust and fibers and on exposure to low doses of solvents and sensitizing agents. Biomarkers of early exposure and their associated effects as indicators of disease-derived information will be tested and standardized within individual projects. Risks arising from some NCDs, like pneumoconioses, cancers and

  18. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    important in projects that used DB. (3) Experience--Team experience is important on all green design projects independent of the PDM. Owners should use a 'best value' selection process, which is more prevalent in DB projects, and include team experience as a criterion. The owner's role is critical with DB. (4) Leadership--Leadership is an important feature for all contracting parties involved in green design projects and it is a dominant success factor in DB projects. (5) Scope of work--A well-defined scope of work is important on all projects, independent of the PDM. In DB, improving the scope of work definition by developing a set of documents, typically comparable to the design development phase, as the basis for awarding a contract is called DB bridging. Using contracting techniques such as DB bridging can result in better identification of expected quality and improves the owner's level of control. (6) Funding and Budget--Having adequate funding and budget for the given scope of work is particularly important in a green design project. Public funding restrictions may not allow use of certain PDMs, and the nature of public funding streams may make non-traditional PDMs more difficult. (7) Complexity and Flexibility--Complexity and flexibility is a project feature that is more specific to green design projects and is more frequently associated with DB. (8) Control and Accountability--Control and accountability is a problem associated with DB more than with DBB. It is not specific to green design projects. DB Bridging can be used to offset the lack of control with traditional DB. The use of green design and DB is increasing and understanding the linkage between the two is important. This research has found that while linkages do exist, the owner needs to carefully consider all aspects of a green design project before making the decision of the most appropriate PDM.

  19. Solar hydrogen project - Thermochemical process design

    Energy Technology Data Exchange (ETDEWEB)

    Allen, D.J.; Ng, L.F.; Rao, M.S.M.; Wu, S.F.; Zoschak, R.J.

    1984-08-01

    The thermochemical decomposition of water using solar energy offers an elegant way of combining solar and chemical technologies to produce a high quality fuel. The DOE has sponsored Foster Wheeler to develop a process design for a solar water-splitting process based on the sulfuric acid/iodine cycle. The study has centered around the design of a sulfuric acid decomposition reactor and the central receiver. Materials' properties impose severe constraints upon the design of decomposition reactor. In this paper, the constraints imposed on the design are specified and a reactor and receiver design is presented together with a preliminary design of the balance of plant.

  20. Design and Co-design of Project-organized Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Andreasen, Lars Birch

    2014-01-01

    The chapter contributes to discussions on design processes in relation to education, presenting different notions of design research and demonstrating how professors and students are involved together in designing innovative and constructive study processes that can help foster students' engagement...

  1. Production of Working Reference Materials for the Capability Evaluation Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillip D. Noll, Jr.; Robert S. Marshall

    1999-03-01

    Nondestructive waste assay (NDA) methods are employed to determine the mass and activity of waste-entrained radionuclides as part of the National TRU (Trans-Uranic) Waste Characterization Program. In support of this program the Idaho National Engineering and Environmental Laboratory Mixed Waste Focus Area developed a plan to acquire capability/performance data on systems proposed for NDA purposes. The Capability Evaluation Project (CEP) was designed to evaluate the NDA systems of commercial contractors by subjecting all participants to identical tests involving 55 gallon drum surrogates containing known quantities and distributions of radioactive materials in the form of sealed-source standards, referred to as working reference materials (WRMs). Although numerous Pu WRMs already exist, the CEP WRM set allows for the evaluation of the capability and performance of systems with respect to waste types/configurations which contain increased amounts of {sup 241}Am relative to weapons grade Pu, waste that is dominantly {sup 241}Am, as well as wastes containing various proportions of depleted uranium. The CEP WRMs consist of a special mixture of PuO{sub 2}/AmO{sub 2} (IAP) and diatomaceous earth (DE) or depleted uranium (DU) oxide and DE and were fabricated at Los Alamos National Laboratory. The IAP WRMS are contained inside a pair of welded inner and outer stainless steel containers. The DU WRMs are singly contained within a stainless steel container equivalent to the outer container of the IAP standards. This report gives a general overview and discussion relating to the production and certification of the CEP WRMs.

  2. The Work Design Questionnaire (WDQ): Developing and Validating a Comprehensive Measure for Assessing Job Design and the Nature of Work

    Science.gov (United States)

    Morgeson, Frederick P.; Humphrey, Stephen E.

    2006-01-01

    Although there are thousands of studies investigating work and job design, existing measures are incomplete. In an effort to address this gap, the authors reviewed the work design literature, identified and integrated previously described work characteristics, and developed a measure to tap those work characteristics. The resultant Work Design…

  3. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  4. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  5. Work Zone Intrusion Report Interface Design

    Science.gov (United States)

    2018-02-02

    While necessary for roadways, work zones present a safety risk to crew. Half of road workers deaths between 2005 and 2010 were due to collisions with motorists intruding on the work zone. Therefore, addressing intrusions is an important step for ensu...

  6. 30 CFR 71.208 - Bimonthly sampling; designated work positions.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Bimonthly sampling; designated work positions... UNDERGROUND COAL MINES Sampling Procedures § 71.208 Bimonthly sampling; designated work positions. (a) Each... standard when quartz is present), respirable dust sampling of designated work positions shall begin on the...

  7. Topical and working papers on nuclear power capacity projections

    International Nuclear Information System (INIS)

    As a part of the overall work programme of WG. 1, Sub-Group 1A/2A was formed jointly with WG. 2 and given the responsibility for estimating the growth of nuclear power up to the year 2025 and the associated demands for nuclear fuels, heavy water, enrichment and other fuel cycle services. In carrying out the first part of its task, the estimation of nuclear power capacity growth, sub-Group 1A/2A prepared 6 working papers which contain the following information: A critique of recent world energy demand forecasts; world energy demand and installed capacity to the year 2025; nuclear power growth projections 1977-2000 for developing countries; long range world nuclear power growth projections; INFCE forecasts of nuclear generating capacity 1985-2025

  8. Keynote presentation: Project Management, Technology and Evolving Work Processes

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    not be used in the workplace when students graduate, but rather on the ”engine” of problem solving and communication strategies which drives projects and affects project success from the stakeholders point of view. Once students understand the engine, they are able to not only use software tools...... management documents looked like, but also how these documents are interconnected and work together to solve a problem. In addition, as they were in communication with a real client, they needed to work iteratively, ch anging their understanding of the problem, which in turn changed their options for solving...... the problem as well as planning and communicating the solution. This dynamic participation in problem solving helped students gain experience beyond recognition and reproduction  Campus Encounters – Bridging Learners Conference “Developing Competences for Next Generation Service Sectors” April 13–14, 2011...

  9. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  10. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  11. Leadership Behaviors In Project Design Offices

    OpenAIRE

    Kasapoğlu, Esin

    2011-01-01

    Leadership may be defined as the ability to collect a group of people around definite objectives and the achievement of said objectives. An architectural design team needs a leader, and in this paper, the owner of the office is the formal leader. Leadership behaviors of employer architects are directly related to the performance of the design team; therefore, effective leadership is key to a successful design process. Data were collected through a questionnaire on leadership behaviors that wa...

  12. Knowledge Translation of Interprofessional Collaborative Patient-Centred Practice: The Working Together Project Experience

    Science.gov (United States)

    MacDonald, Colla J.; Archibald, Douglas; Stodel, Emma; Chambers, Larry W.; Hall, Pippa

    2008-01-01

    The Working Together (WT) project involved the design and delivery of an online learning resource for healthcare teams in long-term care (LTC) so that knowledge regarding interprofessional collaborative patient-centred practice (ICPCP) could be readily accessed and then transferred to the workplace. The purpose of this paper is to better…

  13. Supplemental design requirements document, Project W026

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1993-01-01

    This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770

  14. Dust as a Working Fluid for Heat Transfer Project

    Science.gov (United States)

    Mantovani, James G.

    2015-01-01

    The project known as "Dust as a Working Fluid" demonstrates the feasibility of a dust-based system for transferring heat radiatively into space for those space applications requiring higher efficiency, lower mass, and the need to operate in extreme vacuum and thermal environments - including operating in low or zero gravity conditions in which the dust can be conveyed much more easily than on Earth.

  15. Experiencing Organizational Work Design: Beyond Hackman and Oldham

    Science.gov (United States)

    Fornaciari, Charles J.; Dean, Kathy Lund

    2005-01-01

    Standard organizational behavior survey courses usually introduce students to the "nuts and bolts" of organizational work design and models that mechanize work. This article develops an experiential exercise that simulates working conditions that can foster greater student understanding of the affective, ethical, and human aspects of work design.…

  16. Integrated project delivery : The designer as integrator

    NARCIS (Netherlands)

    Wamelink, J.W.F.; Koolwijk, J.S.J.; van Doorn, A.J.

    2012-01-01

    Process innovation related to integrated project delivery is an important topic in the building industry. Studies on process innovation through the use of integrated contracts usually focus on contractors, and particularly on the possibility of forward integration into the building process. Three

  17. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  18. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  19. A Case Study of User-Centred Design in Four Swiss RUP Projects

    Directory of Open Access Journals (Sweden)

    Ljiljana Vukelja

    2010-01-01

    Full Text Available We analysed four Rational Unified Process (RUP projects in Switzerland that identified themselves as following a user-centred approach. Grounded theory served for analysis of 12 interviews with software developers, project managers, and UI specialists. For each professional group we analysed their work context, motivations, work practices, and strategies used to overcome the obstacles to user-centred design. Results show that end users did not participate in the projects. Instead of working directly with end users, participants used data from marketing research or consulted colleagues from other departments. Prototypes played an important role. We suggest the following remedies: (1 developing methods for easy integration of existing company knowledge about products with usability features, (2 professionalising UI design by educating project stakeholders in standard UI design, (3 creating an approved pool of company's personas for UI specialists' work, and (4 educating customers on their right to get good user interfaces.

  20. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  1. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  2. Intranet Development and Design that Works

    International Nuclear Information System (INIS)

    BACA, BOBBY G.; CASSIDY, ANDREA L.

    1999-01-01

    Making information available and easy to find is the objective of designing a good web site. A company's Intranet typically provides a great deal of information to its employees in an effort to help them better perform their jobs. If the information is available but is difficult to locate, the usefulness of this information is diminished. Sandia National Laboratories performed a redesign of its home page and has obtained a successful design which enables its employees to locate information quickly and efficiently. Three phases of usability testing were conducted to develop and optimize the home page. This paper will discuss the redesign of the Intranet home page and describe how usability studies were used to help ensure a usable design

  3. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  4. MANAGERIAL PERFORMANCE THROUGH WORK SYSTEM DESIGN

    Directory of Open Access Journals (Sweden)

    R. CURETEANU

    2009-05-01

    Full Text Available Purpose: to look at job design, motivation and teamwork. As the market gets more competitive, companies must change their plan of attack on almost a daily basis. They need to answer the question: what is the best way to do business? As employers look at job design they will find that it is not the only factor that indicates how productive employees are in the workplace. Motivation also determines how much energy employees will expend, as well as what tasks will be accomplished, and in what amount of time it will be completed.

  5. Design, construction and monitoring of sealing work

    International Nuclear Information System (INIS)

    Fischle, W.R.; Schwieger, K.

    1986-01-01

    By flooding a worked-out mine, it was possible to test the sealing work on a full scale. The aim is to erect an impermeable, statically secure seal requiring no maintenance. Apart from testing measuring equipment, data were to be obtained for later safety calculations. The measurements are also used to check the computer programs. After a dry period of over a year, flooding started at the beginning of 1985 and so did the testing of the seal and the measuring equipment in caustic soda solution. (orig./PW) [de

  6. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  7. Optimal design of work zone median crossovers.

    Science.gov (United States)

    2010-09-01

    The use of temporary median crossovers in work zones allows for the closure of one side of a multi-lane roadway while : maintaining two-way traffic on the opposite side. This process provides the ability for construction and maintenance crews : to co...

  8. The rationale for selecting the method of calculation of project products coast (works, services

    Directory of Open Access Journals (Sweden)

    O. V. Molchanova

    2017-01-01

    Full Text Available In modern conditions of management it is necessary to develop a number of recommendations on the introduction of management accounting at state-owned enterprises that carry out revenue-generating activities or based on the right of economic management. It is necessary to apply the correct cost-accounting method for the production of products, works, services for a more rational calculation of the cost price. This will allow management personnel to receive timely objective information about their cost price, identify the feasibility of production and sales, justify the assortment, plan profits. The procedure for determining the cost price of the project products (works, services in the theory and practice of the state enterprise of the Astrakhan region “Kasprybproekt” is investigated in the work. With the existing practice of planning in design organizations, the planned cost price of design and survey works for established cost items is planned in the cost estimate for production by the design organization as a whole and by the types of work: design, survey and others, without subdividing it by orders (projects. According to this, accounting of the actual costs for work in the design organizations is based. The study showed that the state enterprise of the Astrakhan region “Kasprybproyekt” performs different projects with different execution periods; therefore, it is advisable to use one method of calculating the cost price - job (order costing method, and link it to the responsibility centers depending on the department of the performer. Based on the research of the used method to the cost price calculate of the project products (works, services in the state enterprise of the Astrakhan region “Kasprybproekt”, it was proposed to use the job (order costing method that allows to detail all the project costs without distorting the final financial result and optimize the project costs. If the calculation method is correctly determined

  9. Life project of adolescents, a product of socio-educational work of school

    Directory of Open Access Journals (Sweden)

    Maibel Rebollar-Ferrer

    2016-10-01

    Full Text Available The improvement of formative work, through a life orientation that is characterized by the correspondence of aspirations or individual goals, potentials and social demands is a challenge to Junior high school in the design and implementation of sócio–educative system of actions, that led by principals and teachers, integrates socializing agents, in order to prepare adolescents in managing a developmental life project to ensure their integration into dynamic and complex society. This research paper nowadays, from the pedagogical, psychological and sociological references, a conceptual basis for understanding adolescents’ life project as an expression of integral formation and the product of social and educational work of school.

  10. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential......In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...

  11. ANALYSIS AND TRANSFORMATION OF WORKS IN DESIGN

    DEFF Research Database (Denmark)

    Thomsen, Bente Dahl

    2017-01-01

    værkanalysen for arkitektur er der med den som udgangs punkt udvikle en guidelines værkanalyse af designs og undersøgt betingelserne for en vellykket transformation af æstetiske kvaliteter fra et værk til et nyt produkt. Master studerende har samtidig undersøgt hvad værkers beskriver som værende poetisk...

  12. Engineering and Design: Civil Works Cost Engineering

    Science.gov (United States)

    1994-03-31

    labor cost requirements are broken into tasks of work. Each task is usually performd by a labor crew. Crews may vary in size and mix of skills. The...requested in advance of the expected purchase date. Suppliers are reluctant to guarantee future pricw and ofien will only quote current prices. It may be...unit cost is the overhead cost for the item. g. Sources for Pricing. The Cost Engineer must rely on judgement, historical data, and current labor market

  13. Projecting regulatory expectations for advanced reactor designs

    International Nuclear Information System (INIS)

    Viktorov, A.

    2011-01-01

    This paper explores the overarching safety principles that will likely guide the safety design of advanced reactor technologies. As will be shown, the already established safety framework provides a solid foundation for the safety design of future nuclear power plants. As a specific example, the principle of 'proven technology' is presented in greater detail and its implications for a novel technology are discussed. Research, modeling and prototyping are shown to be components in satisfying this principle. While the fundamental safety principles are in place, their interpretation may depend both on the considered technology as well as the national context. Thus, the regulatory authority will need to be engaged, at an appropriate stage of the technology development, in specifying the regulatory requirements that will have to be met for a specific reactor design. (author)

  14. Accumulator ring design for the NSNS project

    International Nuclear Information System (INIS)

    Weng, W.T.; Alessi, J.; Beebe-Wang, J.

    1997-01-01

    The goal of the proposed National Spallation Neutron Source (NSNS) is to provide a short pulse proton beam of about 0.5 μs with average beam power of 1 MW. To achieve such purpose, a proton storage ring operated at 60 Hz with 1 x 10 14 protons per pulse at 1 GeV is required. The Accumulator Ring (AR) receives 1 msec long H - beam bunches of 28 mA from a 1 GeV linac. Scope and design performance goals of the AR are presented, other possible technological choices and design options considered, but not adopted, are also briefly reviewed

  15. From the past to the future: Integrating work experience into the design process.

    Science.gov (United States)

    Bittencourt, João Marcos; Duarte, Francisco; Béguin, Pascal

    2017-01-01

    Integrating work activity issues into design process is a broadly discussed theme in ergonomics. Participation is presented as the main means for such integration. However, a late participation can limit the development of both project solutions and future work activity. This article presents the concept of construction of experience aiming at the articulated development of future activities and project solutions. It is a non-teleological approach where the initial concepts will be transformed by the experience built up throughout the design process. The method applied was a case study of an ergonomic participation during the design of a new laboratory complex for biotechnology research. Data was obtained through analysis of records in a simulation process using a Lego scale model and interviews with project participants. The simulation process allowed for developing new ways of working and generating changes in the initial design solutions, which enable workers to adopt their own developed strategies for conducting work more safely and efficiently in the future work system. Each project decision either opens or closes a window of opportunities for developing a future activity. Construction of experience in a non-teleological design process allows for understanding the consequences of project solutions for future work.

  16. CAD Skills Increased through Multicultural Design Project

    Science.gov (United States)

    Clemons, Stephanie

    2006-01-01

    This article discusses how students in a college-entry-level CAD course researched four generations of their family histories and documented cultural and symbolic influences within their family backgrounds. AutoCAD software was then used to manipulate those cultural and symbolic images to create the design for a multicultural area rug. AutoCAD was…

  17. CEBAF design overview and project status

    International Nuclear Information System (INIS)

    Leemann, C.

    1988-01-01

    The Continuous Beam Accelerator Facility (CEBAF) will be an electron accelerator for nuclear physics research providing continuous beams with energies up to at least 4 GeV. The CEBAF is a recirculating linac. The design rationale, performance objectives, concept and fundamental choices for the CEBAF are discussed. 19 references, 10 figures, 1 table

  18. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and field testing (Part 1) and with data analysis and report writing (Part 2). ... New website will help record vital life events to improve access to services for all ... How are public health actors working with the food and drinks industry to ...

  19. CHI 2013 Human Work Interaction Design (HWID) SIG

    DEFF Research Database (Denmark)

    Clemmensen, Torkil; Campos, Pedro F.; Katre, Dinesh S.

    2013-01-01

    In this SIG we aim to introduce the IFIP 13.6 Human Work Interaction Design (HWID) approach to the CHI audience. The HWID working group aims at establishing relationships between extensive empirical work-domain studies and HCI design. We invite participants from industry and academia with an inte...

  20. Inverse axial mounting stiffness design for lithographic projection lenses.

    Science.gov (United States)

    Wen-quan, Yuan; Hong-bo, Shang; Wei, Zhang

    2014-09-01

    In order to balance axial mounting stiffness of lithographic projection lenses and the image quality under dynamic working conditions, an easy inverse axial mounting stiffness design method is developed in this article. Imaging quality deterioration at the wafer under different axial vibration levels is analyzed. The desired image quality can be determined according to practical requirements, and axial vibrational tolerance of each lens is solved with the damped least-squares method. Based on adaptive interval adjustment, a binary search algorithm, and the finite element method, the axial mounting stiffness of each lens can be traveled in a large interval, and converges to a moderate numerical solution which makes the axial vibrational amplitude of the lens converge to its axial vibrational tolerance. Model simulation is carried out to validate the effectiveness of the method.

  1. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  2. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  3. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  4. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  5. Design criteria for Reedy Creek Demonstration Project

    International Nuclear Information System (INIS)

    Felicione, F.S.; Logan, J.A.

    1980-11-01

    This document defines the basic criteria for the 100-ton/day pilot plant which will use the Andco-Torrax pyrolysis process at Walt Disney World in Orlando, Florida, to produce hot water. The waste will simulate transuranic wastes which are stored at INEL. The Andco-Torrax process is designed to convert mixed municipal refuse into energy and is called slagging pyrolysis solid waste conversion

  6. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  7. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    This paper aims to emphasize the necessity of introducing Project-Based Learning (PBL) to design enterprises in order to foster designers creativity and facilitate innovation of design enterprises. According to the literature review, creativity can be viewed as the first stage of innovation; PBL...

  8. Designing Project Management for Global Software Development

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; B. Balogh, Maria; Iversen, Cathrine

    2014-01-01

    of distributed software teams, based on a practice study and informed by well-known theories. Our work pinpoints the difficulties of handling the vital informal processes in distributed collaboration that are so vulnerable because the distances risk detaining their growth and increasing their decay rate......Software development in distributed teams remains challenging despite rapid technical improvement in tools for communication and collaboration across distance. The challenges stem from geographical, temporal and sociocultural distance and manifest themselves in a variety of difficulties...

  9. Maintenance of Traffic for Innovative Geometric Design Work Zones

    Science.gov (United States)

    2015-12-01

    Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The res...

  10. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  11. Key Success Factors and Guidance for International Collaborative Design Projects

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2015-11-01

    Full Text Available In the built environment (BE sector, the co-creation process of design demands understanding of requirements (as viewed by parties involved, mobilisation of tacit knowledge, negotiation, and complex exchange of information. The need to collaborate over distance has further exacerbated the complexity of the process, and, in itself, represents a significant challenge for BE professionals who are increasingly expected to undertake this process within globally distributed virtual teams. The research aims to identify key success factors and develop guidance for international collaborative design projects, via the implementation of collaborative design courses in UK and Canadian universities over three academic years. Questionnaire surveys, focus groups, observation of online meetings, personal reflections provided data for the analysis. The findings reveal the significance of the perceived risk of collaboration and a difference in preferred communication mode between architects and civil/structural engineers. These findings suggest the impact of training in the subject discipline, and that the opportunity for co-located working has helped the development of trust. The guidance is aimed at BE educators who wish to implement this activity in their courses.

  12. Design of New Food Technology: Social Shaping of Working Environment

    DEFF Research Database (Denmark)

    Broberg, Ole

    2000-01-01

    A five-year design process of a continuous process wok has been studied with the aim of elucidating the conditions for integrating working environment aspects. The design process is seen as a network building activity and as a social shaping process of the artefact. A working environment log...... is suggested as a tool designers can use to integrate considerations of future operators' working environment....

  13. Analysis of Work Design in Rubber Processing Plant

    OpenAIRE

    Wahyuni Dini; Nasution Harmein; Budiman Irwan; Wijaya Khairini

    2018-01-01

    The work design illustrates how structured jobs, tasks, and roles are defined and modified and their impact on individuals, groups, and organizations. If the work is not designed well, the company must pay greater costs for workers’ health, longer production processes or even penalties for not being able to meet the delivery schedule. This is visible to the condition in a rubber processing factory in North Sumatra. Work design aspects such as layouts, machinery and equipment, worker's physica...

  14. Encoder designed to work in harsh environments

    Energy Technology Data Exchange (ETDEWEB)

    Toop, L.

    2007-05-15

    Dynapar has developed the Acuro AX71 absolute encoder for use on offshore or land-based oil rig operations. It provides feedback on the operation of automated systems such as draw works, racking systems, rotary tables and top drives. By ensuring that automated systems function properly, this encoder responds to a need by the oil and gas industry to keep workers safe and improve efficiency, particularly for operations in rugged situations. The encoder provides feedback from motor systems to controllers, giving information about position and speed of downhole drill bits. This newly developed encoder is better than commonly used incremental encoders which are not precise in strong electrical noise environments. Rather, the absolute encoder uses a different method of reporting to the controller. A digital signal is transmitted constantly as the device operates. It is less susceptible to noise issues. It is highly accurate, tolerant of noise and is not affected by power outages. However, the absolute encoder is generally more delicate in drilling applications with high ambient temperatures and shock levels. Dynapar addressed this issue by developing compact stainless steel housing that is useful for corrosion resistance in marine applications. The AX71 absolute encoder can withstand up to 100 G of mechanical shock and ambient temperatures of up to 60 degrees C. The encoder is ATEX certified without barriers, and offers the high resolution feedback of 4,000 counts of multiturn rotation and 16,000 counts of position. 1 fig.

  15. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  16. Bidding for the unemployed: an application of mechanism design to welfare-to-work programs

    NARCIS (Netherlands)

    Onderstal, S.

    2009-01-01

    This paper applies the theory of mechanism design to welfare-to-work programs. When procuring welfare-to-work projects to employment service providers, governments face the problems of adverse selection (the winning provider is not the most efficient one) and moral hazard (the winning provider

  17. Bidding for the unemployed: an application of mechanism design to welfare-to-work programs

    NARCIS (Netherlands)

    Onderstal, S.

    2007-01-01

    This paper applies the theory of mechanism design to welfare-to-work programs. When procuring welfare-to-work projects to employment service providers, governments face the problems of adverse selection (the winning provider is not the most efficient one) and moral hazard (the winning provider

  18. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  19. Characteristics of the process of culture development project activities (culture of social engineering) at the future bachelors of social work

    OpenAIRE

    Natalya I. Nikitina; Elena Yu. Romanovaa; Tatyana V. Vasilyeva; Irina N. Nikishina; Veronica M. Grebennikova

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate`s (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of young specialists in social sphere institutions. The article discusses various aspects of future social work bachelors` vocational project activity cult...

  20. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  1. Project margins of advanced reactor design WWER-500

    International Nuclear Information System (INIS)

    Rogov, M.F.; Birukov, G.I.; Ershov, V.G.; Volkov, B.E.

    1994-01-01

    Project criteria for design of advanced WWER-500 reactor within design conditions are compared to the requirements of the Russian regulatory guides. Normal operation limits, safe operation limits for main anticipated operational occurrences and design limits accepted for design basis accidents are considered as in preliminary safety report. It is shown that the basic design criteria in the design of WWER-500 for the anticipated operational occurrences and for design basis accidents are more severe than required in the following regulatory guides General Safety Regulations for Nuclear Power Plants and Nuclear Safety Rules for Reactors of Nuclear Power Plants. This provides certain margins from safety point of view

  2. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  3. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  4. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  5. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... of this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  6. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  7. FMEA and consideration of real work situations for safer design of production systems.

    Science.gov (United States)

    Lux, Aurélien; Mawo De Bikond, Johann; Etienne, Alain; Quillerou-Grivot, Edwige

    2016-12-01

    Production equipment designers must ensure the health and safety of future users; in this regard, they augment requirements for standardizing and controlling operator work. This contrasts with the ergonomic view of the activity, which recommends leaving operators leeway (margins for manoeuvre) in performing their task, while safeguarding their health. Following a brief analysis of design practices in the car industry, we detail how the Failure Modes and Effects Analysis (FMEA) approach is implemented in this sector. We then suggest an adaptation that enables designers to consider real work situations. This new protocol, namely, work situation FMEA, allows experience feedback to be used to defend the health standpoint during designer project reviews, which usually only address quality and performance issues. We subsequently illustrate the advantage of this approach using two examples of work situations at car parts manufacturers: the first from the literature and the second from an in-company industrial project.

  8. Seismic safety margins research program. Project VIII load combination project: work plan

    International Nuclear Information System (INIS)

    Chou, C.K.; Vepa, K.; George, L.; Smith, P.D.

    1979-01-01

    The proposed load combination project has the following overall objectives: develop a methodology for appropriate combination of dynamic loads for nuclear power plants under normal plant operation, transients, accidents, and natural hazards; establish design criteria, load factors, and component service levels for appropriate combinations of dynamic loads or responses to be used in nuclear power plant design; determine the reliability of typical piping systems, both inside and outside the containment structure, and provide the NRC with a sound technical basis for defining the criteria for postulating pipe breaks; and determine the probabilities of a large LOCA induced directly and indirectly by a range of earthquakes

  9. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  10. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  11. The ESDRED project: Engineering studies and demonstration of repository designs

    International Nuclear Information System (INIS)

    Verstricht, J.

    2009-01-01

    The construction, operation and closure of a deep geological repository for spent fuel and long-lived radioactive waste in clay involves specific technologies. The demonstration of these techniques at an industrial scale is being carried out in the frame of a technological integrated project within the sixth Framework Programme of EURATOM. The Belgian design for high level waste disposal is based on the so-called Supercontainer concept. Within this concept, the waste is encased in a carbon steel overpack, which is consequently fitted into a 70 cm thick concrete shell, in its turn enveloped by a stainless steel liner. A Supercontainer measures about 2 m in diameter. In the design of the repository, the Supercontainers will be emplaced, one after the other, in disposal galleries. The space between the Supercontainers and the gallery lining needs to be filled up with a solid material. The most essential function of this component, referred to as backfill, is to prevent a collapse of the gallery. A secondary function is to limit the presence of free oxygen, to limit corrosion. In the ESDRED project EIG EURIDICE, together with SCK-CEN and ONDRAF/NIRAS, investigates technologies to apply the backfill. After testing two techniques to apply the backfill in 2007 at limited scale (unite with granular material and grouting with backfill mortar), grouting was selected as the preferred technique. This technique then should be tested at full-scale (30 m long mock-up). First, a full-scale structure needs to built, including an extensive instrumentation programme. In addition, the logistical needs to ensure a continuous backfill operation have to be worked out. The objective is to have the almost 100 m 3 backfilled in 4 hours

  12. Under Construction: An Experiential Exercise Illustrating Elements of Work Design

    Science.gov (United States)

    Donovan, Kimberly M.; Fluegge-Woolf, Erin R.

    2015-01-01

    The Under Construction Exercise was developed by the authors to highlight key factors of work design that when implemented among the work group or entire organization can lead to an environment conducive to fostering satisfaction and motivation. In the exercise, groups are assigned to one of four different conditions that are designed to emulate…

  13. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  14. Cognitive System Engineering Approach to Design of Work Support Systems

    DEFF Research Database (Denmark)

    Rasmussen, Jens

    1995-01-01

    The problem of designing work support systems for flexible, dynamic work environments is discussed and a framework for analysis of work in terms of behavior shaping constraints is described. The application of 'ecological interfaces' presenting to the user a map of the relational structure...... of the work space is advocated from the thesis that a map is a better guidance of discretionary tasks than is a route instruction. For the same reason, support of system design is proposed in terms of maps of the design territory, rather than in terms of guidelines....

  15. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  16. The experimental design of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Steven L. Sheriff; Shuoqiong. He

    1997-01-01

    The Missouri Ozark Forest Ecosystem Project (MOFEP) is an experiment that examines the effects of three forest management practices on the forest community. MOFEP is designed as a randomized complete block design using nine sites divided into three blocks. Treatments of uneven-aged, even-aged, and no-harvest management were randomly assigned to sites within each block...

  17. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  18. Work Centered Support System Design: Using Frames to Reduce Work Complexity

    National Research Council Canada - National Science Library

    Eggleston, Robert G; Whitaker, Randall D

    2002-01-01

    .... Based on our experience implementing the design of three WCSSs we have distilled a set of three form-based design principles that help insure a work-centered perspective is expressed in the interface...

  19. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  20. High-Efficiency Klystron Design for the CLIC Project

    CERN Document Server

    Mollard, Antoine; Peauger, Franck; Plouin, Juliette; Beunas, Armel; Marchesin, Rodolphe

    2017-01-01

    The CLIC project requests new type of RF sources for the high power conditioning of the accelerating cavities. We are working on the development of a new kind of high-efficiency klystron to fulfill this need. This work is performed under the EuCARD-2 European program and involves theoretical and experimental study of a brand new klystron concept.

  1. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  2. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  3. Designing Pervasive Computing Technology - In a Nomadic Work Perspective

    DEFF Research Database (Denmark)

    Kristensen, Jannie Friis

    2002-01-01

    In my thesis work I am investigating how the design of pervasive/ubiquitous computing technology, relate to the flexible and individual work practice of nomadic workers. Through empirical studies and with an experimental systems development approach, the work is focused on: a) Supporting...

  4. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  5. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  6. Reflexive project management in high-ambition projects : Exploring the competencies for managing innovative sustainable designs

    NARCIS (Netherlands)

    Loeber, A.; Vermeulen, T.

    2016-01-01

    Purpose The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  7. Using design science in educational technology research projects

    Directory of Open Access Journals (Sweden)

    Susan M. Chard

    2017-12-01

    Full Text Available Design science is a research paradigm where the development and evaluation of a technology artefact is a key contribution. Design science is used in many domains and this paper draws on those domains to formulate a generic structure for design science research suitable for educational technology research projects. The paper includes guidelines for writing proposals using the design science research methodology for educational technology research and presents a generic research report structure. The paper presents ethical issues to consider in design science research being conducted in educational settings and contributes guidelines for assessment when the research contribution involves the creation of a technology artefact.

  8. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  9. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  10. A Nordic Project Project on High Speed Low Power Design in Sub-micron CMOS Technology for Mobile

    DEFF Research Database (Denmark)

    Olesen, Ole

    1997-01-01

    circuit design is based on state-of-the-art CMOS technology (0.5µm and below) including circuits operating at 2GHz. CMOS technology is chosen, since a CMOS implementation is likely to be significantly cheaper than a bipolar or a BiCMOS solution, and it offers the possibility to integrate the predominantly...... of including good off-chip components in the design by use of innovative, inexpensive package technology.To achieve a higher level of integration, the project will use a novel codesign approach to the design strategy. Rather than making specifications based on a purely architectural approach, the work uses...

  11. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  12. Knowledge of ideas: On design and the politics of relevance in concept development work

    DEFF Research Database (Denmark)

    Yoshinaka, Yutaka

    important roles in the selection of ideas for conceptualization and synthesis work in such projects – they at once open up and enable, while also delimit and constrain, the design space in which practitioners may engage their insight and skills. The study explores the translation of knowledge practices......The paper examines the emergent nature of how ideas and problem issues are handled in the organisational processes of project work in design. It addresses the knowledge practices entailed in the (re)association of past projects or activities within a project with ongoing ones (the idea of knowledge...... reuse). This is pursued from the standpoint of the particular and partial framings of knowledge, as localised and situated in character and enactment, through its socio-material ordering and mediation in heterogeneous networks of relations. Network building processes and the drawing of relevance play...

  13. Airborne remote sensors applied to engineering geology and civil works design investigations

    Science.gov (United States)

    Gelnett, R. H.

    1975-01-01

    The usefulness of various airborne remote sensing systems in the detection and identification of regional and specific geologic structural features that may affect the design and location of engineering structures on major civil works projects is evaluated. The Butler Valley Dam and Blue Lake Project in northern California was selected as a demonstration site. Findings derived from the interpretation of various kinds of imagery used are given.

  14. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  15. Characteristics of the Process of Culture Development Project Activities (Culture of Social Engineering) at the Future Bachelors of Social Work

    Science.gov (United States)

    Nikitina, Natalya I.; Romanova, Elena Yu.; Vasilyeva, Tatyana V.; Nikishina, Irina N.; Grebennikova, Veronica M.

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate's (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of…

  16. Collective Efficacy and Its Relationship with Leadership in a Computer-Mediated Project-Based Group Work

    Science.gov (United States)

    Huh, Yeol; Reigeluth, Charles M.; Lee, Dabae

    2014-01-01

    Based on Bandura's work, the four sources of efficacy shaping were examined in regard to frequency and students' perception of importance in a computer-mediated, project-based high school classroom. In a context of group work where there was no designated leader, groups' collective efficacy was examined if it has any relationship with individual's…

  17. Great Expectations - Does worker participation in design enhance the integration of working environment and work life issues into design?

    DEFF Research Database (Denmark)

    Hansen, Iben Posniak

    in the design process and the object of design have not been computer artefacts or systems but workplace design and redesign of product series. The design process in the two cases has included physical working environment aspects but contrary to participatory ergonomics, psychosocial working environment...... of political processes. This perspective focuses upon three different spheres which define the learning space: the work and the work organisation; the formal system of negotiation and cooperation; the informal social relations and values. The perspective provides an excellent explanation...... of the interrelationship between the three spheres in the daily work and how these spheres have influence on the possibilities of learning. The role of technology is dismissed in this perspective and as I find that technology is an important factor in the learning space, I extend the perspective to include technology...

  18. Project Kaleidoscope: Advancing What Works in Undergraduate STEM Education

    Science.gov (United States)

    Elrod, S.

    2011-12-01

    In 1989, Project Kaleidoscope (PKAL) published its first report, What Works: Building Natural Science Communities, on reforming undergraduate STEM (science, technology, engineering and mathematics) education. Since then, PKAL has grown into a national organization comprised of a diverse group of over 6500 STEM educators who are committed to advancing "what works." The PKAL mission is to be a national leader in catalyzing the efforts of people, institutions, organizations and networks to move from analysis to action in significantly improving undergraduate student learning and achievement in STEM (science, technology, engineering and mathematics). Specifically, PKAL's strategic goals are to: 1) Promote the development and wider use of evidence-based teaching, learning and assessment approaches, 2) Build individual and organizational capacity to lead change in STEM education, and 3) Engage the broader community of external stakeholders - professional and disciplinary societies, business and industry groups, accreditation organizations, educational associations, governmental agencies, philanthropic organizations - in achieving our mission. PKAL achieves these goals by serving as the nexus of an interconnected and multidisciplinary web of people, ideas, strategies, evidence and resources focused on systemic change in undergraduate STEM education. PKAL also provides resources on critical issues, such as teaching using pedagogies of engagement, and engages interested faculty, campuses and professional societies in national projects and programs focused on cutting edge issues in STEM education. One of these projects - Mobilizing Disciplinary Societies for a Sustainable Future - is engaging eleven disciplinary societies, including the National Association of Geoscience Teachers, in defining specific resources, faculty development programs and goals focused on promoting undergraduate STEM courses that: 1) provide more knowledge about real-world issues; 2) connect these real

  19. Understanding Organizational Agility: A Work-Design Perspective

    National Research Council Canada - National Science Library

    Holsapple, Clyde W; Li, Xun

    2008-01-01

    This paper introduces a unified theoretical model of organizational agility and investigates the attributes of knowledge-intensive work-design systems, which contribute to achieving and sustaining organizational agility...

  20. Design of lane merges at rural freeway construction work zones.

    Science.gov (United States)

    2012-10-01

    Practices for the design and control of work zone traffic control configurations have evolved over time : to reflect safer and more efficient management practices. However, they are also recognized as areas : of frequent vehicle conflicts that can ca...

  1. Ergonomics work assessment in rural industrial settings: a student occupational therapy project.

    Science.gov (United States)

    Bowman, Peter J

    2012-01-01

    This case study describes a student occupational therapy (OT) program, the creation of a worksite assessment project as a part of a Community Connections: Partners for Learning and Service grant funded by Health Resources and Services Administration. The primary goals were to design occupation-based community learning experiences in a variety of rural community settings, so that students might benefit from participating in the community based learning and: based on the results, embed occupation-based learning into existing occupational therapy curriculum. The components of the project and the ergonomics content of the OT education program are described; details of the work assessment are presented with analysis of data from the student evaluation of this project.

  2. The Process of Designing for Learning: Understanding University Teachers' Design Work

    Science.gov (United States)

    Bennett, Sue; Agostinho, Shirley; Lockyer, Lori

    2017-01-01

    Interest in how to support the design work of university teachers has led to research and development initiatives that include technology-based design-support tools, online repositories, and technical specifications. Despite these initiatives, remarkably little is known about the design work that university teachers actually do. This paper…

  3. Automated platform for designing multiple robot work cells

    Science.gov (United States)

    Osman, N. S.; Rahman, M. A. A.; Rahman, A. A. Abdul; Kamsani, S. H.; Bali Mohamad, B. M.; Mohamad, E.; Zaini, Z. A.; Rahman, M. F. Ab; Mohamad Hatta, M. N. H.

    2017-06-01

    Designing the multiple robot work cells is very knowledge-intensive, intricate, and time-consuming process. This paper elaborates the development process of a computer-aided design program for generating the multiple robot work cells which offer a user-friendly interface. The primary purpose of this work is to provide a fast and easy platform for less cost and human involvement with minimum trial and errors adjustments. The automated platform is constructed based on the variant-shaped configuration concept with its mathematical model. A robot work cell layout, system components, and construction procedure of the automated platform are discussed in this paper where integration of these items will be able to automatically provide the optimum robot work cell design according to the information set by the user. This system is implemented on top of CATIA V5 software and utilises its Part Design, Assembly Design, and Macro tool. The current outcomes of this work provide a basis for future investigation in developing a flexible configuration system for the multiple robot work cells.

  4. Analysis of Work Design in Rubber Processing Plant

    Directory of Open Access Journals (Sweden)

    Wahyuni Dini

    2018-01-01

    Full Text Available The work design illustrates how structured jobs, tasks, and roles are defined and modified and their impact on individuals, groups, and organizations. If the work is not designed well, the company must pay greater costs for workers’ health, longer production processes or even penalties for not being able to meet the delivery schedule. This is visible to the condition in a rubber processing factory in North Sumatra. Work design aspects such as layouts, machinery and equipment, worker's physical working environment, work methods, and organizational policies have not been well-organized. Coagulum grinding machines into sheets are often damaged, resulting in 4 times the delay of product delivery in 2016, the presence of complaints of heat exposure submitted by workers, and workstation that has not been properly arranged is an indication of the need for work design. The research data will be collected through field observation, and distribution of questionnaires related aspects of work design. The result of the analysis depends on the respondent's answer from the distributed questionnaire regarding the 6 aspects studied.

  5. Analysis of Work Design in Rubber Processing Plant

    Science.gov (United States)

    Wahyuni, Dini; Nasution, Harmein; Budiman, Irwan; Wijaya, Khairini

    2018-02-01

    The work design illustrates how structured jobs, tasks, and roles are defined and modified and their impact on individuals, groups, and organizations. If the work is not designed well, the company must pay greater costs for workers' health, longer production processes or even penalties for not being able to meet the delivery schedule. This is visible to the condition in a rubber processing factory in North Sumatra. Work design aspects such as layouts, machinery and equipment, worker's physical working environment, work methods, and organizational policies have not been well-organized. Coagulum grinding machines into sheets are often damaged, resulting in 4 times the delay of product delivery in 2016, the presence of complaints of heat exposure submitted by workers, and workstation that has not been properly arranged is an indication of the need for work design. The research data will be collected through field observation, and distribution of questionnaires related aspects of work design. The result of the analysis depends on the respondent's answer from the distributed questionnaire regarding the 6 aspects studied.

  6. User-inspired design methodology using Affordance Structure Matrix (ASM for construction projects

    Directory of Open Access Journals (Sweden)

    Maheswari J. Uma

    2017-01-01

    Full Text Available Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost among others. The existing design theories and practice are primarily based on functional requirements. Function-based design deals with design of artifact alone, which may yield favourable or unfavourable consequences with the design artifact. However, incorporating other interactions such as interactions between user & designer is necessary for optimised end-result. Hence, the objective of this research work is to devise a systematic design methodology considering all the three interactions among users, designers and artefacts for improved design efficiency. In this study, it has been attempted to apply the theory of affordances in a case project that involves the design of an offshore facility. A step-by-step methodology for developing Affordance Structure Matrix (ASM, which integrates House of Quality (HOQ and Design Structure Matrix (DSM, is proposed that can effectively capture the user requirements. HOQ is a popular quality management tool for capturing client requirements and DSM is a matrix-based tool that can capture the interdependency among the design entities. The proposed methodology utilises the strengths of both the tools, as DSM compliments HOQ in the process. In this methodology, different affordances such as AUA (Artifact-User-Affordance, AAA (Artifact-Artifact-Affordance and DDA (Designer-Designer-Affordance are captured systematically. Affordance is considered to be user-driven in this context that is in contrast to prevailing design

  7. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  8. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  9. Project Portal User-Centered Design and Engineering Report

    Science.gov (United States)

    2016-06-01

    TECHNICAL REPORT 3013 June 2016 Project Portal User-Centered Design and Engineering Report Deborah Gill-Hesselgrave Veronica Higgins Sarah...Design and Engineering Branch Under authority of Chris Raney, Head Command and Control Technology and Experiments Division iii EXECUTIVE...navy.mil  Christian Szatkowski christian.szatkowski@navy.mil  Roni Higgins roni.higgins@navy.mil  Jake Viraldo jacob.viraldo@navy.mil B

  10. Improving industrial designers work process by involving user research

    DEFF Research Database (Denmark)

    Dai, Zheng; Ómarsson, Ólafur

    2011-01-01

    With changing times, new technologies and more opinionated consumers, the modern industrial designer has found himself in need of fresher and more up to date approaches in his daily work. In a fast moving industry, the designer needs to keep a thinking process of dynamic and subjective attitude...... will give the grounding for believing that the industrial designer needs to adopt user research methods to a level where he can still continue to work under the very nature of industrial design that has made it a successful practice for the last century. The combing of the approaches and attitude will help....... User research is part of user centered design (UCD). UCD has a reputation for subjective and reflective practice. In this paper there are two example cases. One is conducted by a classical industrial design process, and another is costing half of energy and time in user research. These examples...

  11. Delft Aerospace Design Projects 2016 : Inspring Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2016-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2015 and the Spring Design Synthesis Exercise of 2016, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  12. Delft Aerospace Design Projects 2015 : Challenging New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2015-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2014 and the Spring Design Synthesis Exercise of 2015, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  13. Delft Aerospace Design Projects 2014 : New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2014-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2013 and the Spring Design Synthesis Exercise of 2014, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  14. Design decisions in workflow management and quality of work.

    NARCIS (Netherlands)

    Waal, B.M.E. de; Batenburg, R.

    2009-01-01

    In this paper, the design and implementation of a workflow management (WFM) system in a large Dutch social insurance organisation is described. The effect of workflow design decisions on the quality of work is explored theoretically and empirically, using the model of Zur Mühlen as a frame of

  15. Contradictions in Portfolio Careers: Work Design and Client Relations

    Science.gov (United States)

    Fenwick, Tara J.

    2006-01-01

    Purpose: The paper aims to explore "Portfolio work", an emerging form of flexible self-employment, which has been identified as significant but under-researched. This paper also seeks to explore the challenges and benefits of portfolio work from the perspective of individuals' experiences. Design/methodology/approach: The argument draws from a…

  16. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  17. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  18. The ZAP Project: Designing Interactive Computer Tools for Learning Psychology

    Science.gov (United States)

    Hulshof, Casper; Eysink, Tessa; de Jong, Ton

    2006-01-01

    In the ZAP project, a set of interactive computer programs called "ZAPs" was developed. The programs were designed in such a way that first-year students experience psychological phenomena in a vivid and self-explanatory way. Students can either take the role of participant in a psychological experiment, they can experience phenomena themselves,…

  19. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  20. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  1. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  2. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  3. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    these works is also a part of further Kazakhstan contribution in ITER project. JSC 'UMP' provides feasibility study of manufacturing possibility of complete details from beryllium together with superconductor components taking into consideration ITER project requirements. It is supposed that new grades of beryllium, such as SS65C or DSHG-200, will be developed or alternative grade of beryllium with its further verification will be used. As a support for project ITER participation as well as for development of new contemporary trends in science and technology development, and for training the high skilled personnel a unique and the only one in the world KTM experimental tokamak installation is being developed in the country. It will be used for testing structural materials and important elements of thermonuclear reactors. At present a draft of scientific program for KTM reactor researches has been worked out; also feasibility study has been conducted, preliminary design is completed and the work of design documentation development and modeling of the installation is got under way. KTM tokamak, which is constructed in NNC RK in partnership with Russian organizations, will allow to perform predicative tests of future ITER reactor assemblies being produced at JSC 'UMP'. It will promote international cooperation in the field of thermonuclear material science and new material production. It will also contribute greatly in new technologies and modern designs of thermonuclear fusion reactors debugging. ITER and KTM projects are the examples of Successful Eurasia cooperation in the field of peaceful atomic energy use

  4. UBERA-6 project: Achievements of 4 working years

    International Nuclear Information System (INIS)

    Blaumann, H; Fernandez, C; Dell Occhio, L; D Ovidio, C; Fabro, J; Miceli, M; Novara O; Perez, A; Taboada, H

    2009-01-01

    On May 2005 the President of CNEA created the UBERA-6 project, belonging to the former Technology and Environmental Management, with the aim to convert to Low Enriched Uranium (LEU) the RA-6 reactor core, to swap with the US Department of Energy (US-DoE) equivalent inventories of High Enriched Uranium (HEU) for LEU, to export to USA the spent HEU core and to recover and downblend to LEU remnant HEU inventories contained in fuel and irradiation target scraps. By means of two contracts signed by CNEA and US-DoE, acquisition of consumables and graphite reflectors, the fabrication of LEU core replacement, conditioning, transport and exportation of spent HEU core and subsequent supply of fresh LEU for fuel and irradiation targets used in our research reactors were costed. During July, 2006 468 HEU based fresh plates were exported to USA. On June 30th, 2007 the RA-6 reactor temporarily stopped working and its personnel remover the HEU core to the auxiliary pool. On November 7th the former spent HEU based core was exported to USA. During May and July, 2008 the new RA-6 reactor LEU based core and control assemblies were provided. During March, 2009 the RA-6 reactor became critical. For recovering and blending down of remnant HEU inventories, the Triple Height Laboratory (LTA) was refurbished. A Supplemental Agreement to one of the original contract between CNEA and US-DoE will financially support the refurbishment of the Radiochemical Facility Laboratory (LFR) and so reprocess irradiated HEU retained in radioisotope production filters to downblend into LEU, as well as the separation of the pair Sr90-Y90 and of Cs137 inventories for further application in Nuclear Medicine. [es

  5. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  6. Designing an intranet from scratch to sketch: experiences from techniques used in the IDEnet project

    DEFF Research Database (Denmark)

    Berndtsson, Johan

    1999-01-01

    The choice of techniques to support system design is important in order to achieve a satisfactory result with regard to the quality of the future system. In the IDEnet development project, we chose to work with techniques used within, or inspired by, three different research areas: sociology...

  7. A Tire Gasification Senior Design Project That Integrates Laboratory Experiments and Computer Simulation

    Science.gov (United States)

    Weiss, Brian; Castaldi, Marco J.

    2006-01-01

    A reactor to convert waste rubber tires to useful products such as CO and H2, was investigated in a university undergraduate design project. The student worked individually with mentorship from a faculty professor who aided the student with professional critique. The student was able to research the background of the field and conceive of a novel…

  8. Environmental Impact Assessment (Eia) On Project Design: An ...

    African Journals Online (AJOL)

    PROF. O. E. OSUAGWU

    2013-09-01

    Sep 1, 2013 ... The research work, studied and exposed the nature, concept and ... at 0.05 level of significance; and in the presentation of the field survey ... A relationship between the cost of EIA exercise and the cost of design was .... cited by [1], EIA is an activity designed to .... researchers based on their desire to limit the.

  9. Sampling design for use by the soil decontamination project

    International Nuclear Information System (INIS)

    Rutherford, D.W.; Stevens, J.R.

    1981-01-01

    This report proposes a general approach to the problem and discusses sampling of soil to map the contaminated area and to provide samples for characterizaton of soil components and contamination. Basic concepts in sample design are reviewed with reference to environmental transuranic studies. Common designs are reviewed and evaluated for use with specific objectives that might be required by the soil decontamination project. Examples of a hierarchial design pilot study and a combined hierarchial and grid study are proposed for the Rocky Flats 903 pad area

  10. Digital VLSI systems design a design manual for implementation of projects on FPGAs and ASICs using Verilog

    CERN Document Server

    Ramachandran, S

    2007-01-01

    Digital VLSI Systems Design is written for an advanced level course using Verilog and is meant for undergraduates, graduates and research scholars of Electrical, Electronics, Embedded Systems, Computer Engineering and interdisciplinary departments such as Bio Medical, Mechanical, Information Technology, Physics, etc. It serves as a reference design manual for practicing engineers and researchers as well. Diligent freelance readers and consultants may also start using this book with ease. The book presents new material and theory as well as synthesis of recent work with complete Project Designs

  11. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  12. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  13. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  14. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  15. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  16. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  17. Summary, Working Group 1: Electron guns and injector designs

    International Nuclear Information System (INIS)

    Ben-Zvi, I.; Bazarov, I.V.

    2006-01-01

    We summarize the proceedings of Working Group 1 of the 2005 Energy Recovery Linac (ERL) Workshop. The subject of this working group, the electron gun and injector design, is arguably the most critical part of the ERL as it determines the ultimate performance of this type of accelerators. Working Group 1 dealt with a variety of subjects: The technology of DC, normal-conducting RF and superconducting RF guns; beam dynamics in the gun and injector; the cathode and laser package; modeling and computational issues; magnetized beams and polarization. A short overview of these issues covered in the Working Group is presented in this paper

  18. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  19. Infusing and sustaining aging content in social work education: findings from GeroRich projects.

    Science.gov (United States)

    Hash, Kristina M; Gottlieb, Jody; Harper-Dorton, Karen V; Crawley-Woods, Geraldine; Shelek-Furbee, Katherine; Smith, John David; Brown, Rita

    2007-01-01

    This article presents findings from experiences of 67 projects involved in GeroRich, an initiative funded by the John A. Hartford Foundation designed to infuse, enrich and sustain aging content in BSW and MSW curricula. Thematic qualitative analysis was used to uncover themes in answers to open-ended questions contained in End-of-Year 2 project reports. Content areas addressed by open-ended answers were: (1) successes and innovations, and (2) challenges requiring responses. Primary successes and innovations identified were as follows: curriculum enrichment, faculty and student involvement, student-learning activities and community. Challenges to be responded to were identified as lack of faculty involvement, competing demands on faculty and programs, and sustainability of project efforts. Examples of strategies implemented to overcome these obstacles include providing teaching resources, instituting financial and other supports, and developing strategic plans for sustaining content infusion post-funding. Experiences of the GeroRich projects offer practical considerations for other social work programs that accept the challenge of attracting and preparing students to work with the increasing population of older adults.

  20. Experimental and theoretical analysis for improved microscope design of optical projection tomographic microscopy.

    Science.gov (United States)

    Coe, Ryan L; Seibel, Eric J

    2013-09-01

    We present theoretical and experimental results of axial displacement of objects relative to a fixed condenser focal plane (FP) in optical projection tomographic microscopy (OPTM). OPTM produces three-dimensional, reconstructed images of single cells from two-dimensional projections. The cell rotates in a microcapillary to acquire projections from different perspectives where the objective FP is scanned through the cell while the condenser FP remains fixed at the center of the microcapillary. This work uses a combination of experimental and theoretical methods to improve the OPTM instrument design.

  1. Project of computer program for designing the steel with the assumed CCT diagram

    OpenAIRE

    S. Malara; J. Trzaska; L.A. Dobrzański

    2007-01-01

    Purpose: The aim of this paper was developing a project of computer aided method for designing the chemicalcomposition of steel with the assumed CCT diagram.Design/methodology/approach: The purpose has been achieved in four stages. At the first stage characteristicpoints of CCT diagram have been determined. At the second stage neural networks have been developed, andnext CCT diagram terms of similarity have been worked out- at the third one. In the last one steel chemicalcomposition optimizat...

  2. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    Science.gov (United States)

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following

  3. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  4. Work-based Project Overcomes Basic Skills Stigma.

    Science.gov (United States)

    Wallis, Emma

    2002-01-01

    A project to provide steel workers in North Wales with guidance about learning opportunities and to promote lifelong learning in the workplace focused on the development of basic information technology skills. (JOW)

  5. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  6. Participatory ergonomics for psychological factors evaluation in work system design.

    Science.gov (United States)

    Wang, Lingyan; Lau, Henry Y K

    2012-01-01

    It is a well recognized understanding that workers whose voice needs to be heard should be actively encouraged as full participants and involved in the early design stages of new ergonomic work system which encompass the development and implementation of new tools, workplaces, technologies or organizations. This paper presents a novel participatory strategy to evaluate three key psychological factors which are respectively mental fatigue, spiritual stress, and emotional satisfaction in work system design based on a modified version of Participatory Ergonomics (PE). In specific, it integrates a PE technique with a formulation view by combining the parallel development of PE strategies, frameworks and functions throughout the coverage of the entire work system design process, so as to bridge the gap between qualitative and quantitative analysis of psychological factors which can cause adverse or advantageous effects on worker's physiological and behavioral performance.

  7. Rapid product development: project engineering joined to design engineering in a concurrent engineering context

    Science.gov (United States)

    Bernard, Alain; Ouazzani, A.; Chambolle, F.; Bocquet, Jean Claud

    1997-01-01

    Software tools for designers are mainly based on geometry. Today, many industrial modelers have been rebuilt with C++, or any other object oriented language. This paper proposes to locate the research topics, in order to develop a functional link between project management tools, technical data management and product models. The 'design process' aspect will also be justified through the need of capitalizing designer intent and design history. This is related to different research works of Mechanical Engineering and Logistics Laboratory of Ecole Centrale Paris, and especially two PhD topics.

  8. Motivation, Participation, and Engagement in Human Work Interaction Design Literature

    DEFF Research Database (Denmark)

    Barricelli, Barbara Rita; Clemmensen, Torkil; Campos, Pedro

    2016-01-01

    This position paper is aimed at presenting as discussion material at the CoPDA 2016 Workshop the preliminary results of a short review of the literature published by the HWID community in the last 10 years in four books. Specifically, the attention is posed on understanding the importance of moti...... of motivation, participation, and engagement in Interaction Design projects for smart and pervasive workplaces...

  9. Work, Train, Win: Work-Based Learning Design and Management for Productivity Gains. OECD Education Working Papers, No. 135

    Science.gov (United States)

    Kis, Viktoria

    2016-01-01

    Realising the potential of work-based learning schemes as a driver of productivity requires careful design and support. The length of work-based learning schemes should be adapted to the profile of productivity gains. A scheme that is too long for a given skill set might be unattractive for learners and waste public resources, but a scheme that is…

  10. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  11. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  12. Work group design in pharmacy: the pharmacist-technician team.

    Science.gov (United States)

    Kershaw, B P; Solomon, D K; Zarowitz, B J

    1987-05-01

    The contemporary pharmacy practice manager faces the challenge of designing pharmacy service programs that not only satisfy the needs of the patient, but at the same time satisfy and motivate the pharmacists and technicians who sustain the programs. This research examined the team design, which has been recommended but not fully described in the literature. This application did not explore the full potential of the team design in the hospital pharmacy setting. More study is needed in this area to assess the impact of work group design on the expansion of clinical programs, employee turnover rates, quality and quantity of work produced, and, most important, the impact on job satisfaction enjoyed by pharmacists and technicians.

  13. Working group 4B - human intrusion: Design/performance requirements

    International Nuclear Information System (INIS)

    Channell, J.

    1993-01-01

    There is no summary of the progress made by working group 4B (Human Intrusion: Design/performance Requirements) during the Electric Power Research Institute's EPRI Workshop on the technical basis of EPA HLW Disposal Criteria, March 1993. This group was to discuss the waste disposal standard, 40 CFR Part 191, in terms of the design and performance requirements of human intrusion. Instead, because there were so few members, they combined with working group 4A and studied the three-tier approach to evaluating postclosure performance

  14. Workshop on cultural usability and human work interaction design

    DEFF Research Database (Denmark)

    Clemmensen, Torkil; Ørngreen, Rikke; Roese, Kerstin

    2008-01-01

    it into interaction design. The workshop will present current research into cultural usability and human work interaction design. Cultural usability is a comprehensive concept, which adheres to all kinds of contexts in which humans are involved (private family, work, public and private organizations, nature......, Workplace observation, Think-Aloud Usability Test, etc. These techniques often give - seemingly - similar results when applied in diverse cultural settings, but experience shows that we need a deep understanding of the cultural, social and organizational context to interpret the results, and to transform...

  15. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  16. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  17. On designing low pressure loss working spaces for a planar Stirling micromachine

    Science.gov (United States)

    Hachey, M.-A.; Léveillé, É.; Fréchette, L. G.; Formosa, F.

    2015-12-01

    In this paper, research was undertaken with the objective to design low pressure loss working spaces for a Stirling cycle micro heat engine operating from low temperature waste heat. This planar free-piston heat engine is anticipated to operate at the kHz level with mm3 displacement. Given the resonant nature of the free-piston configuration, the complexity of its working gas’ flow geometry and its projected high operating frequency, flow analysis is relatively complex. Design considerations were thus based on fast prototyping and experimentation. Results show that geometrical features, such as a sharp 90° corner between the regenerator and working spaces, are strong contributors to pressure losses. This research culminated into a promising revised working space configuration for engine start-up, as it considerably reduced total pressure losses, more than 80% at Re = 700, from the original design.

  18. Project design of an open pit colliery in Terkidag, Turkey

    Directory of Open Access Journals (Sweden)

    H. Kose

    2010-10-01

    Full Text Available In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to relyon domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature workconcerning open pit design and production planning is explained in detail. On this basis, the project design and production planningof Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that willbe utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regardingthe project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.

  19. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  20. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  1. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik

    2010-01-01

    Reaction Engineering. In order to incorporate reactor design into process design in a meaningful way, the teachers of the respective courses need to collaborate (Standard 9 – Enhancement of Faculty CDIO skills). The students also see that different components of the chemical engineering curriculum relate......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...... of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B...

  2. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  3. High-gain capsule design for the HIDIF project

    International Nuclear Information System (INIS)

    Honrubia, J.J.; Cerrada, J.A.; Gomez, R.

    2000-01-01

    A high-gain capsule has been designed for the HIDIF project. The goal has been to relax the accelerator requirements by using a radiation pulse with lower peak temperature (220 eV) than previous designs (260 eV). The ablator material is beryllium doped with a very low concentration (0.2 atom %) of copper. The capsule absorbs 1.3 MJ and yields, approximately, 450 MJ in I-D simulations. The effect of the opacity of the ablator on capsule performance has been studied in detail. (authors)

  4. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  5. Design basis event consequence analyses for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Orvis, D.D.; Haas, M.N.; Martin, J.H.

    1997-01-01

    Design basis event (DBE) definition and analysis is an ongoing and integrated activity among the design and analysis groups of the Yucca Mountain Project (YMP). DBE's are those that potentially lead to breach of the waste package and waste form (e.g., spent fuel rods) with consequent release of radionuclides to the environment. A Preliminary Hazards Analysis (PHA) provided a systematic screening of external and internal events that were candidate DBE's that will be subjected to analyses for radiological consequences. As preparation, pilot consequence analyses for the repository subsurface and surface facilities have been performed to define the methodology, data requirements, and applicable regulatory limits

  6. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository.

  7. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  8. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    International Nuclear Information System (INIS)

    Schroeder, B.K.

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository

  9. Design of CR superconducting dipole magnet in German FAIR project

    International Nuclear Information System (INIS)

    Zhu Yinfeng; Wu Weiyue; Wu Songtao; Xu Houchang; Liu Changle

    2008-01-01

    The engineering design of CR (collector ring) superconducting magnet of German FAIR (facility for antiproton and ion research) project is introduced. 3-D model is formed by CATIA, and the magnetic filed of 1/4 magnet is analyzed with ANSYS. Then the displacement and stress of the coil case, liquid helium (LHe) case, especially, the maximal displacement and stress when quenching happens are calculated based on the analysis of magnetic field. These results are necessary for manufacturing the formal magnet. (authors)

  10. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  11. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  12. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  13. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  14. Design fixation and cooperative learning in elementary engineering design project: A case study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  15. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  16. Hanford Waste Vitrification Plant Project advanced conceptual design summary report

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1988-11-01

    The Hanford Waste Vitrification Plant (HWVP) will immobilize Hanford defense liquid high-level waste in borosilicate glass in preparation for shipment to a geologic repository. The shipment of the waste to the repository will satisfy an objective in the President's Defense Waste Management Plan. The glass product will be cast into stainless steel canisters, which will be sealed and stored at Hanford until they are shipped. This document summarizes work performed during the Advance Conceptual Design (ACD) of the HWVP. In the Reference Conceptual Design phase, which preceded the ACD, a number of design issues were identified with the potential to improve cost effectiveness, safety, constructibility, and operability. The ACD addressed and evaluated these design issues. Implementation of recommendations derived from ACD work will occur in subsequent design phases. The next design phase is preliminary design which will be followed by detailed design and construction. Net potential cost improvements of more than $36.9M were identified along with improvements in safety, constructibility, and operability. No negative schedule impacts will result from implementation of the improvements. 11 refs., 5 figs., 3 tabs

  17. 49 CFR 30.13 - Restrictions on Federal public works projects: Certification.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects... WORKS CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.13 Restrictions on Federal public works projects: Certification. As prescribed...

  18. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  19. Collaborative ethnography for information systems research Studying knowledge work practices and designing supportive information systems

    Directory of Open Access Journals (Sweden)

    Ronald Maier

    2012-04-01

    Full Text Available Understanding knowledge work and supporting it with information systems (ISs are challenging tasks. Knowledge work has changed substantially recently and studies on how knowledge work is currently performed are scarce. Ethnography is the most suitable qualitative research method for studying knowledge work, yet too time-consuming, costly and unfocused for the fast changing IS domain. Moreover, results from qualitative studies need to be transformed into artefacts useful for IS requirements engineering and design. This paper proposes a procedure for collaborative ethnography to study knowledge work practices and inform IS requirements gathering and design illustrated with the case of a collaborative ethnographic study of seven organisations in four European countries performed in a large-scale international IS research and development project. The paper also critically discusses the procedure’s applicability and limitations.

  20. Online Group Work Design: Processes, Complexities, and Intricacies

    Science.gov (United States)

    Kleinsasser, Robert; Hong, Yi-Chun

    2016-01-01

    This paper describes the challenges of designing and implementing online group work. We are responsible for a seven-and-a-half week's online literacy and bi-literacy graduate course in a Bilingual/English as a Second Language (BLE/ESL) Master of Arts program. One of the tasks includes online literacy circle exchanges where students are encouraged…

  1. Designing a ticket to ride with the Cognitive Work Analysis Design Toolkit.

    Science.gov (United States)

    Read, Gemma J M; Salmon, Paul M; Lenné, Michael G; Jenkins, Daniel P

    2015-01-01

    Cognitive work analysis has been applied in the design of numerous sociotechnical systems. The process used to translate analysis outputs into design concepts, however, is not always clear. Moreover, structured processes for translating the outputs of ergonomics methods into concrete designs are lacking. This paper introduces the Cognitive Work Analysis Design Toolkit (CWA-DT), a design approach which has been developed specifically to provide a structured means of incorporating cognitive work analysis outputs in design using design principles and values derived from sociotechnical systems theory. This paper outlines the CWA-DT and describes its application in a public transport ticketing design case study. Qualitative and quantitative evaluations of the process provide promising early evidence that the toolkit fulfils the evaluation criteria identified for its success, with opportunities for improvement also highlighted. The Cognitive Work Analysis Design Toolkit has been developed to provide ergonomics practitioners with a structured approach for translating the outputs of cognitive work analysis into design solutions. This paper demonstrates an application of the toolkit and provides evaluation findings.

  2. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  3. Design of Mobile Gateway for Implementation of Smart Work System

    Directory of Open Access Journals (Sweden)

    Sang-Young Oh

    2015-01-01

    Full Text Available In the development of new technologies based on mobile system, there is a growing interest as a fundamental technology. In particular, in order to realize a mobile office and mobile phones, conferencing remote document is a technique that can realize smart network services solutions with enhanced real-time communication, real-time information sharing, and collaboration. Therefore, in this paper, the design meets the diverse needs of customers and the smart work platform mobile-based fast and conveniently it is trying to develop. For this reason, I have developed a mobile gateway that is based on the communication server construction OPEN API development, management of mobile ID, protocol design, and design of SSL/TLS security tunnel. Also, we developed a smart work platform that you apply this, you are trying to provide information systems environment of mobile company.

  4. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  5. Student-Designed Service-Learning Projects in an Undergraduate Neurobiology Course

    Directory of Open Access Journals (Sweden)

    Katharine V. Northcutt

    2015-12-01

    Full Text Available One of the challenges in teaching a service-learning course is obtaining student buy-in from all students in the course. To circumvent this problem, I have let students in my undergraduate Neurobiology course design their own service-learning projects at the beginning of the semester. Although this can be chaotic because it requires last-minute planning, I have made it successful through facilitating student communication in the classroom, requiring thorough project proposals, meeting with students regularly, and monitoring group progress through written reflection papers. Most of my students have strong opinions about the types of projects that they want to carry out, and many students have used connections that they have already made with local organizations. Almost all projects that students have designed to this point involve teaching basic concepts of neurobiology to children of various ages while simultaneously sparking their interest in science. Through taking ownership of the project and designing it such that it works well with their strengths, interests, and weekly schedule, students have become more engaged in service learning and view it as a valuable experience. Despite some class time being shifted away from more traditional assignments, students have performed equally well in the course, and they are more eager to talk with others about course concepts. Furthermore, the feedback that I have received from community partners has been excellent, and some students have maintained their work with the organizations.

  6. Reducing work-related Musculoskeletal Disorders (MSDs) through design: Views of ergonomics and design practitioners.

    Science.gov (United States)

    Punchihewa, Himan K G; Gyi, Diane E

    2015-01-01

    Work-related Musculoskeletal Disorders (MSDs) affect the well-being of workers. Unfortunately, user requirements for design to reduce workplace risk factors for MSDs are not always effectively communicated to designers creating a mismatch between the user requirements and what is ultimately produced. To understand the views of practitioners of design and ergonomics regarding tools for participatory design and features they would like to see in such tools. An online questionnaire survey was conducted with a cohort of practitioners of ergonomics and design (n = 32). In-depth interviews were then conducted with a subset of these practitioners (n = 8). To facilitate discussion, a prototype integrated design tool was developed and demonstrated to practitioners using a verbalized walkthrough approach. According to the results of the questionnaire survey, the majority (70%) believed an integrated approach to participatory design would help reduce work-related MSDs and suggested ways to achieve this, for example, through sharing design information. The interviews showed the majority (n = 7) valued being provided with guidance on design activities and ways to manage and present information. It is believed that an integrated approach to design in order to help reduce work-related MSDs is highly important and a provision to evaluate design solutions would be desirable for practitioners of design and ergonomics.

  7. Frequency of work zone accidents on construction projects : final report.

    Science.gov (United States)

    2005-08-01

    The overall objective of this research was to study work zone accidents in New York State, with particular attention to the : occurrence and mitigation of rear-end vehicle accidents. The specific objectives were to: : - Recommend changes to the NYSDO...

  8. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  9. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  10. Design of biped hip simulator using SolidWorks

    Science.gov (United States)

    Zainudin, M. R.; Yahya, A.; Fazli, M. I. M.; Syahrom, A.; Harun, F. K. C.; Nazarudin, M. S.

    2017-10-01

    The increasing number of people who underwent both hip implant surgery based on World Health Organization (WHO) has received massive attention from researchers lately to develop various types of hip simulators in order to test the hip implant. Various number of hip simulator have been developed with different functions and capabilities. This paper presents the design development of biped hip simulator using SolidWorks software by taking into consideration some improvement and modifications. The finite element method is used to test the design whether it is safe to be used or not. The biped hip simulator has been successfully designed and ready to be fabricated as the endurance testing shown a positive results. The von Mises stress induced in the material is an alloy steel which is 2,975,862.3 N/m2 lower than the yield strength. Thus, the design is safe to be used as it obey the safety criterion.

  11. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  12. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  13. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  14. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  15. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...

  16. Informing General CSCW Product Development through Cooperative Design in Specific Work Domains

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Mogensen, Preben Holst

    1997-01-01

    sharing of materials in the engineering domain. In our project, a single engineering company (Great Belt Link Ltd.) was chosen as the user organization. The paper summarizes the process from observational studies, over a future workshop and cooperative prototyping activities, to a pilot installation. We...... describe how these activities informed the general hypermedia framework and application design. Use scenarios and prototypes with example data from the users‘ daily work were used as sources both to trigger design ideas and new insights regarding work practice. Common participants in specific activities...... and general development activities supported transfer of work domain knowledge into general features of the product being developed. Mutual challenging characterized the interaction between specific cooperative analysis and design activities and general development activities. Prototypes, scenarios, materials...

  17. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  18. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  19. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  20. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  1. Automated Work Package: Conceptual Design and Data Architecture

    Energy Technology Data Exchange (ETDEWEB)

    Al Rashdan, Ahmad [Idaho National Lab. (INL), Idaho Falls, ID (United States); Oxstrand, Johanna [Idaho National Lab. (INL), Idaho Falls, ID (United States); Agarwal, Vivek [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-05-26

    frontend aspects of the AWP, the backend data architecture was researched and developed in this effort. The backend design involved data architecture aspects. It was realized through this effort that the key aspects of this design are hierarchy, data configuration and live information, data templates and instances, the flow of work package execution, the introduction of properties, and the means to interface the backend to the frontend. After the backend design was developed, a data structure was built to reflect the developed data architecture. The data structure was developed to accommodate the fifty functionalities identified by the envisioned scenario development. The data structure was evaluated by incorporating an example work order from the nuclear power industry. The implementation resulted in several optimization iterations of the data structure. In addition, the rearrangement of the work order information to fit the data structure highlighted several possibilities for improvement in the current work order design, and significantly reduced the size of the work order.

  2. Automated Work Package: Conceptual Design and Data Architecture

    International Nuclear Information System (INIS)

    Al Rashdan, Ahmad; Oxstrand, Johanna; Agarwal, Vivek

    2016-01-01

    aspects of the AWP, the backend data architecture was researched and developed in this effort. The backend design involved data architecture aspects. It was realized through this effort that the key aspects of this design are hierarchy, data configuration and live information, data templates and instances, the flow of work package execution, the introduction of properties, and the means to interface the backend to the frontend. After the backend design was developed, a data structure was built to reflect the developed data architecture. The data structure was developed to accommodate the fifty functionalities identified by the envisioned scenario development. The data structure was evaluated by incorporating an example work order from the nuclear power industry. The implementation resulted in several optimization iterations of the data structure. In addition, the rearrangement of the work order information to fit the data structure highlighted several possibilities for improvement in the current work order design, and significantly reduced the size of the work order.

  3. PROJECT WORK BY STUDENTS FOR FIRST DEGREE: AN ...

    African Journals Online (AJOL)

    Mofasony

    It is expected that after University education, student of law should write well as ... student's capability, topics should not be assigned to students collectively. .... This enables the student hone-in the theoretical course work in the university. There is no .... Benson O.A. Oluikpe, Thesis Writing, Africana Publishers Ltd, 1982, iv. 7.

  4. Human Work Interaction Design for Pervasive and Smart Workplaces

    DEFF Research Database (Denmark)

    Campos, Pedro F.; Lopes, Arminda; Clemmensen, Torkil

    2014-01-01

    ' experience and outputs? This workshop focuses on answering this question to support professionals, academia, national labs, and industry engaged in human work analysis and interaction design for the workplace. Conversely, tools, procedures, and professional competences for designing human......Pervasive and smart technologies have pushed workplace configuration beyond linear logic and physical boundaries. As a result, workers' experience of and access to technology is increasingly pervasive, and their agency constantly reconfigured. While this in certain areas of work is not new (e.......g., technology mediation and decision support in air traffic control), more recent developments in other domains such as healthcare (e.g., Augmented Reality in Computer Aided Surgery) have raised challenging issues for HCI researchers and practitioners. The question now is: how to improve the quality of workers...

  5. Application of Deterministic and Probabilistic System Design Methods and Enhancements of Conceptual Design Tools for ERA Project

    Science.gov (United States)

    Mavris, Dimitri N.; Schutte, Jeff S.

    2016-01-01

    This report documents work done by the Aerospace Systems Design Lab (ASDL) at the Georgia Institute of Technology, Daniel Guggenheim School of Aerospace Engineering for the National Aeronautics and Space Administration, Aeronautics Research Mission Directorate, Integrated System Research Program, Environmentally Responsible Aviation (ERA) Project. This report was prepared under contract NNL12AA12C, "Application of Deterministic and Probabilistic System Design Methods and Enhancement of Conceptual Design Tools for ERA Project". The research within this report addressed the Environmentally Responsible Aviation (ERA) project goal stated in the NRA solicitation "to advance vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions." To identify technology and vehicle solutions that simultaneously meet these three metrics requires the use of system-level analysis with the appropriate level of fidelity to quantify feasibility, benefits and degradations, and associated risk. In order to perform the system level analysis, the Environmental Design Space (EDS) [Kirby 2008, Schutte 2012a] environment developed by ASDL was used to model both conventional and unconventional configurations as well as to assess technologies from the ERA and N+2 timeframe portfolios. A well-established system design approach was used to perform aircraft conceptual design studies, including technology trade studies to identify technology portfolios capable of accomplishing the ERA project goal and to obtain accurate tradeoffs between performance, noise, and emissions. The ERA goal, shown in Figure 1, is to simultaneously achieve the N+2 benefits of a cumulative noise margin of 42 EPNdB relative to stage 4, a 75 percent reduction in LTO NOx emissions relative to CAEP 6 and a 50 percent reduction in fuel burn relative to the 2005 best in class aircraft. There were 5 research task associated with this research: 1) identify technology collectors, 2) model

  6. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Science.gov (United States)

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  7. Socio-technicality, Human Work Interaction Design (HWID), and Work Engagement

    DEFF Research Database (Denmark)

    Clemmensen, Torkil; Campos, Pedro; Abdelnour-Nocera, José

    the sociotechnical tradition, however, tells us that looking at work engagement only or mainly from a technical design side is the wrong way to go; instead the social and the technical need to be considered on an equal footing. We give the theoretical motivation and background in sociotechnical thinking for our...

  8. The design of the Work Programme in international context

    OpenAIRE

    Finn, Dan

    2011-01-01

    This report compares the design and procurement of the Work Programme (WP) with pertinent experience in Australia, the USA and the Netherlands. It considers the risks in the implementation of performance based contracts, their implications for the WP, and their address in the other countries. The review finds that contract and procurement systems in the comparator countries have been in flux as policy makers have sought to secure the advantages of contracting out whilst minimising attendant r...

  9. Understanding organizational agility: a work-design perspective

    OpenAIRE

    Holsapple, Clyde W.; Li, Xun

    2008-01-01

    This paper introduces a unified theoretical model of organizational agility and investigates the attributes of knowledge-intensive work-design systems, which contribute to achieving and sustaining organizational agility. Even though there has been considerable research on the topic of agility, these studies are not unified regarding their conceptualizations of agility and/or tend to adopt fairly limited views of agility dimensionality. Here, we organize a review of existing definitions and ...

  10. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  11. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  12. MATHEMATICAL MODEL DESIGNATED FOR THE ASSESSMENT OF THE INTEGRATED ENVIRONMENTAL LOAD PRODUCED BY A BUILDING PROJECT

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2012-10-01

    The theoretical background of the proposed approach consists in an integrated methodology implemented in the system engineering of construction projects. A building system may be represented as the aggregate of all stages of construction works and participants involved in them. The building system is object-oriented, and it is implemented under the impact of pre-determined environmental factors. The core constituent of the building system represents a Production Technology Module (PTM, or summarized groups of processes. The model formula designated for the assessment of the intensity of the ecological load produced by the construction project onto the environment may be represented as follows:

  13. Mirage project. Second summary progress report (Work period January to December 1984)

    International Nuclear Information System (INIS)

    Come, B.

    1985-01-01

    This report summarizes the second year of work (1984) in the CEC project MIRAGE on migration of radionuclides in the geosphere. It complements CEC reports EUR 9304 (Description of the project) and EUR 9543 (Works carried out in 1983) on the same topic

  14. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  15. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  16. Collaborative Projects: A Study of Paired Work in a Malaysian University.

    Science.gov (United States)

    Holmes, Richard

    2003-01-01

    Examines the project work of university students in a TESOL (Teaching of English as a Second Language) program in Malaysia. Compares phonetics and phonology projects completed by students working in pairs with those completed by students alone and reports student attitudes and strategies. (Author/LRW)

  17. Design-Build-Finance in the US: The case of iROX, I-75 Road Expansion Project

    OpenAIRE

    Forcael,E; Ellis, JR,R; Jaramillo,F

    2011-01-01

    This project is part of the Interstate 75 road expansion, located in Southwest Florida and consisted of an expansion from four to six lanes along a 30-mile stretch. The paper presents a design, build and finance (DBF) approach applied to a US highway. This work focuses on the financial structure of the project, which did not include a concession (operation); the bidding procedure, which took into account an interesting bid evaluation criterion and; project management matters. The information ...

  18. Fundamental Aeronautics Program: Overview of Project Work in Supersonic Cruise Efficiency

    Science.gov (United States)

    Castner, Raymond

    2011-01-01

    The Supersonics Project, part of NASA?s Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2011) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  19. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  20. Actividades comunicativas en la clase de Inglés : project work. News about your city

    OpenAIRE

    Valero Garcés, Carmen

    1991-01-01

    In the context of language learning, projects are multiskill activities focusing on topics or themes rather than on specific language targets. Students themselves playa crucial part in the initial choice of subject matter and the decisions related to appropiate working method, the project timetable and the eventual «end product». Project work provides students with opportunities to recycle know language and skills in a relatively natural context because specific language a...

  1. How does sustainability certification affect the design process? Mapping final design projects at an architectural office

    DEFF Research Database (Denmark)

    Landgren, Mathilde; Jensen, Lotte Bjerregaard

    2017-01-01

    process and informing the industry of them. This has led to optimised design processes such as Integrated Energy Design, in which many decisions related to energy consumption and indoor climate are made in the early design stages. The current tendency is to use an expanded notion of sustainability......, derived from the sustainability certification system itself, and to apply it even in the early design process. This perspective emphasises all phases of the life cycle of a building. The goal of the present study was to map how a Danish architectural office approached sustainability in the projects......The context of the study is the very strict regulation of energy consumption for operating buildings in Denmark. It is difficult to meet the requirements by system optimisation in the final design phase, so recent research has focused on ways of meeting the target by adapting the whole design...

  2. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  3. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  4. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  5. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  6. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  7. DOUBLE-WALL COLLIMATOR DESIGN OF THE SNS PROJECT

    International Nuclear Information System (INIS)

    SIMOS, N.; LUDEWIG, H.; CATALAN-LASHERAS, N.; CRIVELLO, S.

    2001-01-01

    The collimator absorber array of the Spallation Neutron Source (SNS) project is responsible for stopping the 1.0 GeV protons that are in the halo of the beam. It is estimated that 0.1% of the 2 MW beam will be intercepted by the adopted collimating scheme implemented at various sections of the beam transport and accumulation. This paper summarizes the conceptual design of the collimator absorber as well as the supporting detailed analysis that were performed and guided the design process. Key requirement in the design process is the need for the collimator beam tube to minimize beam impedance while closely following its beta function. Due to lack of available experimental data, the long-term behavior of irradiated materials in an environment where they interface with coolant flow becomes an issue. Uncertainties in the long-term behavior prompted a special double-wall design that will enable not only beam halo interception but also the efficient transfer of deposited energy both under normal and off-normal conditions to the coolant flow. The thermo-mechanical response of the double wall beam tube and of a particle bed surrounding it are discussed in detail in the paper

  8. Learning how scientists work: experiential research projects to promote cell biology learning and scientific process skills.

    Science.gov (United States)

    DebBurman, Shubhik K

    2002-01-01

    Facilitating not only the mastery of sophisticated subject matter, but also the development of process skills is an ongoing challenge in teaching any introductory undergraduate course. To accomplish this goal in a sophomore-level introductory cell biology course, I require students to work in groups and complete several mock experiential research projects that imitate the professional activities of the scientific community. I designed these projects as a way to promote process skill development within content-rich pedagogy and to connect text-based and laboratory-based learning with the world of contemporary research. First, students become familiar with one primary article from a leading peer-reviewed journal, which they discuss by means of PowerPoint-based journal clubs and journalism reports highlighting public relevance. Second, relying mostly on primary articles, they investigate the molecular basis of a disease, compose reviews for an in-house journal, and present seminars in a public symposium. Last, students author primary articles detailing investigative experiments conducted in the lab. This curriculum has been successful in both quarter-based and semester-based institutions. Student attitudes toward their learning were assessed quantitatively with course surveys. Students consistently reported that these projects significantly lowered barriers to primary literature, improved research-associated skills, strengthened traditional pedagogy, and helped accomplish course objectives. Such approaches are widely suited for instructors seeking to integrate process with content in their courses.

  9. Business in Social Work Education: A Historically Black University's Social Work Entrepreneurship Project

    Science.gov (United States)

    Archibald, Paul; Muhammad, Omar; Estreet, Anthony

    2016-01-01

    The destabilization of the current economy has sparked increased interest in entrepreneurship, especially for underrepresented minority social work students. The entrepreneurial thinking of these social work students entering social work programs at historically Black colleges and universities needs to be fostered in a learning environment. This…

  10. The Genome of the Netherlands: design, and project goals

    Science.gov (United States)

    Boomsma, Dorret I; Wijmenga, Cisca; Slagboom, Eline P; Swertz, Morris A; Karssen, Lennart C; Abdellaoui, Abdel; Ye, Kai; Guryev, Victor; Vermaat, Martijn; van Dijk, Freerk; Francioli, Laurent C; Hottenga, Jouke Jan; Laros, Jeroen F J; Li, Qibin; Li, Yingrui; Cao, Hongzhi; Chen, Ruoyan; Du, Yuanping; Li, Ning; Cao, Sujie; van Setten, Jessica; Menelaou, Androniki; Pulit, Sara L; Hehir-Kwa, Jayne Y; Beekman, Marian; Elbers, Clara C; Byelas, Heorhiy; de Craen, Anton J M; Deelen, Patrick; Dijkstra, Martijn; den Dunnen, Johan T; de Knijff, Peter; Houwing-Duistermaat, Jeanine; Koval, Vyacheslav; Estrada, Karol; Hofman, Albert; Kanterakis, Alexandros; Enckevort, David van; Mai, Hailiang; Kattenberg, Mathijs; van Leeuwen, Elisabeth M; Neerincx, Pieter B T; Oostra, Ben; Rivadeneira, Fernanodo; Suchiman, Eka H D; Uitterlinden, Andre G; Willemsen, Gonneke; Wolffenbuttel, Bruce H; Wang, Jun; de Bakker, Paul I W; van Ommen, Gert-Jan; van Duijn, Cornelia M

    2014-01-01

    Within the Netherlands a national network of biobanks has been established (Biobanking and Biomolecular Research Infrastructure-Netherlands (BBMRI-NL)) as a national node of the European BBMRI. One of the aims of BBMRI-NL is to enrich biobanks with different types of molecular and phenotype data. Here, we describe the Genome of the Netherlands (GoNL), one of the projects within BBMRI-NL. GoNL is a whole-genome-sequencing project in a representative sample consisting of 250 trio-families from all provinces in the Netherlands, which aims to characterize DNA sequence variation in the Dutch population. The parent–offspring trios include adult individuals ranging in age from 19 to 87 years (mean=53 years; SD=16 years) from birth cohorts 1910–1994. Sequencing was done on blood-derived DNA from uncultured cells and accomplished coverage was 14–15x. The family-based design represents a unique resource to assess the frequency of regional variants, accurately reconstruct haplotypes by family-based phasing, characterize short indels and complex structural variants, and establish the rate of de novo mutational events. GoNL will also serve as a reference panel for imputation in the available genome-wide association studies in Dutch and other cohorts to refine association signals and uncover population-specific variants. GoNL will create a catalog of human genetic variation in this sample that is uniquely characterized with respect to micro-geographic location and a wide range of phenotypes. The resource will be made available to the research and medical community to guide the interpretation of sequencing projects. The present paper summarizes the global characteristics of the project. PMID:23714750

  11. Optimum design of the metal bellows on the SolidWorks platform

    Directory of Open Access Journals (Sweden)

    Mikhail V. Chugunov

    2017-06-01

    Full Text Available Introduction: The metal bellows are widely used in various technical systems as the sensitive, compensating and separating elements. A variety of possible constructive solutions using bellows causes a broad range of standard sizes specified in GOST. In this regard the problem of the metal bellows design, which in the present case resolves itself to the choice of the bellow corresponding to the set specifications optimum, is important. Thus, the purpose of the research is the development of technique and software for the optimum design automation of the considered class structures. Materials and Methods: SolidWorks is the world leader in the area of CAD/CAE computer aided design-engineering system and possesses not only a developed standard functionality, but also opportunities of extension of this functionality by the user. In this article SolidWorks is used as a platform for the development of Add-In application to create automatically the metal bellow 3D model for the given parameters from the database corresponding to the given specifications. At the same time access to SolidWorks simulation functionality, through the analysis of SolidWorks Simulation, and to the appropriate database is provided by COM technology. For the solution of the optimization problem, the functionality of the Add-In-application developed by authors of this article is used. A development environment is MS Visual Studio C ++ (2015. The basis for work is object-oriented programming with API SolidWorks use. Results: The technique of optimum design of the metal bellows is developed. The software represents the SolidWorks application for practical use creating the project solution in the form of 3D models (parts and assemblies corresponding to the given specifications. Discussion and Conclusions: The developed technique and software reduce considerably time for the development of the project for structures of the considered class.

  12. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  13. Exploratory Shaft Seismic Design Basis Working Group report

    International Nuclear Information System (INIS)

    Subramanian, C.V.; King, J.L.; Perkins, D.M.; Mudd, R.W.; Richardson, A.M.; Calovini, J.C.; Van Eeckhout, E.; Emerson, D.O.

    1990-08-01

    This report was prepared for the Yucca Mountain Project (YMP), which is managed by the US Department of Energy. The participants in the YMP are investigating the suitability of a site at Yucca Mountain, Nevada, for construction of a repository for high-level radioactive waste. An exploratory shaft facility (ESF) will be constructed to permit site characterization. The major components of the ESF are two shafts that will be used to provide access to the underground test areas for men, utilities, and ventilation. If a repository is constructed at the site, the exploratory shafts will be converted for use as intake ventilation shafts. In the context of both underground nuclear explosions (conducted at the nearby Nevada Test Site) and earthquakes, the report contains discussions of faulting potential at the site, control motions at depth, material properties of the different rock layers relevant to seismic design, the strain tensor for each of the waveforms along the shaft liners, and the method for combining the different strain components along the shaft liners. The report also describes analytic methods, assumptions used to ensure conservatism, and uncertainties in the data. The analyses show that none of the shafts' structures, systems, or components are important to public radiological safety; therefore, the shafts need only be designed to ensure worker safety, and the report recommends seismic design parameters appropriate for this purpose. 31 refs., 5 figs., 6 tabs

  14. The Study on Mental Health at Work: Design and sampling.

    Science.gov (United States)

    Rose, Uwe; Schiel, Stefan; Schröder, Helmut; Kleudgen, Martin; Tophoven, Silke; Rauch, Angela; Freude, Gabriele; Müller, Grit

    2017-08-01

    The Study on Mental Health at Work (S-MGA) generates the first nationwide representative survey enabling the exploration of the relationship between working conditions, mental health and functioning. This paper describes the study design, sampling procedures and data collection, and presents a summary of the sample characteristics. S-MGA is a representative study of German employees aged 31-60 years subject to social security contributions. The sample was drawn from the employment register based on a two-stage cluster sampling procedure. Firstly, 206 municipalities were randomly selected from a pool of 12,227 municipalities in Germany. Secondly, 13,590 addresses were drawn from the selected municipalities for the purpose of conducting 4500 face-to-face interviews. The questionnaire covers psychosocial working and employment conditions, measures of mental health, work ability and functioning. Data from personal interviews were combined with employment histories from register data. Descriptive statistics of socio-demographic characteristics and logistic regressions analyses were used for comparing population, gross sample and respondents. In total, 4511 face-to-face interviews were conducted. A test for sampling bias revealed that individuals in older cohorts participated more often, while individuals with an unknown educational level, residing in major cities or with a non-German ethnic background were slightly underrepresented. There is no indication of major deviations in characteristics between the basic population and the sample of respondents. Hence, S-MGA provides representative data for research on work and health, designed as a cohort study with plans to rerun the survey 5 years after the first assessment.

  15. The Study on Mental Health at Work: Design and sampling

    Science.gov (United States)

    Rose, Uwe; Schiel, Stefan; Schröder, Helmut; Kleudgen, Martin; Tophoven, Silke; Rauch, Angela; Freude, Gabriele; Müller, Grit

    2017-01-01

    Aims: The Study on Mental Health at Work (S-MGA) generates the first nationwide representative survey enabling the exploration of the relationship between working conditions, mental health and functioning. This paper describes the study design, sampling procedures and data collection, and presents a summary of the sample characteristics. Methods: S-MGA is a representative study of German employees aged 31–60 years subject to social security contributions. The sample was drawn from the employment register based on a two-stage cluster sampling procedure. Firstly, 206 municipalities were randomly selected from a pool of 12,227 municipalities in Germany. Secondly, 13,590 addresses were drawn from the selected municipalities for the purpose of conducting 4500 face-to-face interviews. The questionnaire covers psychosocial working and employment conditions, measures of mental health, work ability and functioning. Data from personal interviews were combined with employment histories from register data. Descriptive statistics of socio-demographic characteristics and logistic regressions analyses were used for comparing population, gross sample and respondents. Results: In total, 4511 face-to-face interviews were conducted. A test for sampling bias revealed that individuals in older cohorts participated more often, while individuals with an unknown educational level, residing in major cities or with a non-German ethnic background were slightly underrepresented. Conclusions: There is no indication of major deviations in characteristics between the basic population and the sample of respondents. Hence, S-MGA provides representative data for research on work and health, designed as a cohort study with plans to rerun the survey 5 years after the first assessment. PMID:28673202

  16.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  17. Metallurgical test work to support development of the Kintyre Project

    International Nuclear Information System (INIS)

    Maley, M.; Ring, R.; Paulsen, E.; Maxton, D.

    2014-01-01

    The Kintyre uranium deposit is located in the Pilbara region of Western Australia and is jointly owned by Cameco and Mitsubishi. The current indicated resource estimate is approximately 55 million pounds of U 3 O 8 equivalent [~21,000 t U] at an average grade of 0.58% [0.49% U]. Due to the high levels of carbonate minerals in the deposit, alkaline leaching was strongly considered as an option to the usually preferred acid route. Following a detailed assessment, the acid option was chosen, with the preferred flowsheet involving an acid leach, followed by solvent extraction and precipitation. As part of the Kintyre metallurgical investigations, ANSTO Minerals performed an extensive work program, examining numerous aspects of the proposed flowsheet. This included a leach optimisation program, followed by a study determining the effects of sample variability in leaching. Settling, filtration and rheology work on slurries and tailings was performed, as well as testwork to determine the effect of neutralisation conditions on metal precipitation and radionuclide deportment. In addition, an extensive laboratory and solvent extraction mixer-settler mini-pilot plan campaign was performed to compare the performance of conventional ammonia/ammonium sulphate strip and the non-conventional strong acid strip (400 g/L H 2 SO 4 ) using leach liquor generated from Kintyre ore. The pilot plant involved two campaigns of three days continuous operation using each stripping system, with >99.5% uranium recovery achieved in each campaign. This paper will present an overview of the key results from the Kintyre leaching and neutralisation testwork undertaken at ANSTO Minerals, and will also outline the performance of the solvent extraction mini pilot plant. (author)

  18. Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

    Directory of Open Access Journals (Sweden)

    Lukumon Oyedele

    2012-11-01

    Full Text Available Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75, architects/engineers (0.21 ,and engineers/quantity surveyors (0.24. The percentagerank agreement factor (PRAF shows that the five mostimportant factors affecting quality are 'design changes'(78.9%; 'inadequate involvement of other professionalsduring the design stage' (78.9%; 'insufficient andunrealistic constraints of project cost' (71.1 %; 'poor levelof commitment to quality improvement among designprofessionals' (63.2%; and 'making design decisions oncost and not value of work' (55.3%. The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.

  19. Design options for improving protective gloves for industrial assembly work.

    Science.gov (United States)

    Dianat, Iman; Haslegrave, Christine M; Stedmon, Alex W

    2014-07-01

    The study investigated the effects of wearing two new designs of cotton glove on several hand performance capabilities and compared them against the effects of barehanded, single-layered and double cotton glove conditions when working with hand tools (screwdriver and pliers). The new glove designs were based on the findings of subjective hand discomfort assessments for this type of work and aimed to match the glove thickness to the localised pressure and sensitivity in different areas of the hand as well as to provide adequate dexterity for fine manipulative tasks. The results showed that the first prototype glove and the barehanded condition were comparable and provided better dexterity and higher handgrip strength than double thickness gloves. The results support the hypothesis that selective thickness in different areas of the hand could be applied by glove manufacturers to improve the glove design, so that it can protect the hands from the environment and at the same time allow optimal hand performance capabilities. Copyright © 2014 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  20. Work-Based Curriculum to Broaden Learners' Participation in Science: Insights for Designers

    Science.gov (United States)

    Bopardikar, Anushree; Bernstein, Debra; Drayton, Brian; McKenney, Susan

    2018-05-01

    Around the globe, science education during compulsory schooling is envisioned for all learners regardless of their educational and career aspirations, including learners bound to the workforce upon secondary school completion. Yet, a major barrier in attaining this vision is low learner participation in secondary school science. Because curricula play a major role in shaping enacted learning, this study investigated how designers developed a high school physics curriculum with positive learning outcomes in learners with varied inclinations. Qualitative analysis of documents and semistructured interviews with the designers focused on the curriculum in different stages—from designers' ideas about learning goals to their vision for enactment to the printed materials—and on the design processes that brought them to fruition. This revealed designers' emphases on fostering workplace connections via learning goals and activities, and printed supports. The curriculum supported workplace-inspired, hands-on design-and-build projects, developed to address deeply a limited set of standards aligned learning goals. The curriculum also supported learners' interactions with relevant workplace professionals. To create these features, the designers reviewed other curricula to develop vision and printed supports, tested activities internally to assess content coverage, surveyed states in the USA receiving federal school-to-work grants and reviewed occupational information to choose unit topics and career contexts, and visited actual workplaces to learn about authentic praxis. Based on the worked example, this paper offers guidelines for designing work-based science curriculum products and processes that can serve the work of other designers, as well as recommendations for research serving designers and policymakers.

  1. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    International Nuclear Information System (INIS)

    CLEVELAND, K.J.

    2000-01-01

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage

  2. IRC working on design tool to predict lighting effects

    Energy Technology Data Exchange (ETDEWEB)

    Koruluk, W.

    1996-01-01

    A three-year research project by the National Research Council`s Institute for Research in Construction (IRC) to assess how office workers react to different lighting conditions, was announced. A new facility, the first of its kind in Canada, was designed and constructed to simulate and examine all aspects of the indoor environment. The study will involve creating nine different lighting conditions to ascertain the relationship between the various lighting characteristics and people`s actual performance and satisfaction with lighting in the space. The objective is to determine whether reduced energy consumption, hence declining lighting conditions, affect job performance. It is hypothesized that significant losses in job performance, absenteeism, staff turnover or lost customers would far outweigh any savings in energy consumption.

  3. The iSAT Project Mechanical properties and designs

    KAUST Repository

    Llewellyn, Gareth

    2011-08-08

    The whale shark Rhincodon typus is the largest fish in the world. The global population of R.typus is unknown however the International Union for Conservation of Nature (IUNC) classified it as Vulnerable in 2005. To ensure a population of R.typus is maintained protection from direct fishing, by-catch and collision damage is required. To be able to enact successful protection the habitat and range of R.typus must be known. Many authors have conducted studies of R.typus in a variety of different locations and many more have reported sightings. In many locations R.typus consistently appear annually and many authors have hypothesised reasons for their appearance. What is not known however is whether these populations are isolated or inter-linked, and where these populations go when they are not at known sites. The aim of this thesis was to design the body of a vessel that could house the electronics and components designed to track an acoustic tag, survive in open ocean, and travel fast enough to keep up with R.typus allowing a long-term and high resolution track to be compiled. In order to design such a vessel many factors needed to be known. A large part of this thesis is a review of literature to conclude the most appropriate type of vessel, the average speed of R.typus, hence the required speed of the vessel, and the sea state of the Red Sea, hence the conditions the vessel would be required to survive in. It was concluded that the average speed of R.typus is 1.2 knots; the Red Sea reaches Sea State 5-6; and the most appropriate hull type for this project was a Small Waterplane Area Twin Hull (SWATH). After following a design iteration process, a final design was completed that it is believed will achieve all the required objectives.

  4. Quality of Work and Team- and Project Based Work Practices in Engineering

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    It is the aim of this paper to investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals and eventually their quality of work. The paper investigates how professional engineering...... ractices are enacted in two engineering consultancy companies in Denmark where ‘teamwork’ has been or is an ideal for organizing work....

  5. The role of logbooks as mediators of engineering design work

    DEFF Research Database (Denmark)

    McAlpine, Hamish; Cash, Philip; Hicks, Ben

    2017-01-01

    Information transformation is key to engineering design work. However, research on how information management tools, and logbooks in particular, mediate this, is fragmented. We explore this via two studies (from which we confirm the central role of logbooks) and propose three modes of mediation...... are such a central and enduring medium. This synthesises and extends theory on mediation and information use in engineering design. Further, practical insights are derived for the development new information management tools.......: facilitating cognition and creation, gathering and collation of information, and staging and transformation of information. The findings explain the widespread use of logbooks through their support of these three modes. Consequently, we contend that multi-modal mediation is one of the main reasons why logbooks...

  6. Robonaut: a robot designed to work with humans in space

    Science.gov (United States)

    Bluethmann, William; Ambrose, Robert; Diftler, Myron; Askew, Scott; Huber, Eric; Goza, Michael; Rehnmark, Fredrik; Lovchik, Chris; Magruder, Darby

    2003-01-01

    The Robotics Technology Branch at the NASA Johnson Space Center is developing robotic systems to assist astronauts in space. One such system, Robonaut, is a humanoid robot with the dexterity approaching that of a suited astronaut. Robonaut currently has two dexterous arms and hands, a three degree-of-freedom articulating waist, and a two degree-of-freedom neck used as a camera and sensor platform. In contrast to other space manipulator systems, Robonaut is designed to work within existing corridors and use the same tools as space walking astronauts. Robonaut is envisioned as working with astronauts, both autonomously and by teleoperation, performing a variety of tasks including, routine maintenance, setting up and breaking down worksites, assisting crew members while outside of spacecraft, and serving in a rapid response capacity.

  7. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  8. Hydraulic analysis and optimization design in Guri rehabilitation project

    Science.gov (United States)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  9. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  10. The ARAMIS project: a concept robot and technical design.

    Science.gov (United States)

    Colizzi, Lucio; Lidonnici, Antonio; Pignolo, Loris

    2009-11-01

    To describe the ARAMIS (Automatic Recovery Arm Motility Integrated System) project, a concept robot applicable in the neuro-rehabilitation of the paretic upper limb after stroke. Methods, results and conclusion: The rationale and engineering of a state-of-the-art, hardware/software integrated robot system, its mechanics, ergonomics, electric/electronics features providing control, safety and suitability of use are described. An ARAMIS prototype has been built and is now available for clinical tests. It allows the therapist to design neuro-rehabilitative (synchronous or asynchronous) training protocols in which sample exercises are generated by a single exoskeleton (operated by the patient's unaffected arm or by the therapist's arm) and mirrored in real-time or offline by the exoskeleton supporting the paretic arm.

  11. Designing and Implementing Service Learning Projects in an Introductory Oceanography Course Using the ``8-Block Model''

    Science.gov (United States)

    Laine, E. P.; Field, C.

    2010-12-01

    The Campus Compact for New Hampshire (Gordon, 2003) introduced a practical model for designing service-learning exercises or components for new or existing courses. They divided the design and implementation process into eight concrete areas, the “8-Block Model”. Their goal was to demystify the design process of service learning courses by breaking it down into interconnected components. These components include: project design, community partner relations, the problem statement, building community in the classroom, building student capacity, project management, assessment of learning, and reflection and connections. The project design component of the “8-Block Model” asks that the service performed be consistent with the learning goals of the course. For science courses students carry out their work as a way of learning science and the process of science, not solely for the sake of service. Their work supports the goals of a community partner and the community partner poses research problems for the class in a letter on their letterhead. Linking student work to important problems in the community effectively engages students and encourages them to work at more sophisticated levels than usually seen in introductory science classes. Using team-building techniques, the classroom becomes a safe, secure learning environment that encourages sharing and experimentation. Targeted lectures, labs, and demonstrations build the capacity of students to do their research. Behind the scenes project management ensures student success. Learning is assessed using a variety of tools, including graded classroom presentations, poster sessions, and presentations and reports to community partners. Finally, students reflect upon their work and make connections between their research and its importance to the well being of the community. Over the past 10 years, we have used this approach to design and continually modify an introductory oceanography course for majors and non

  12. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  13. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  14. Redeveloping Nicosia International Airport: an extroverting Y2 group design project

    Science.gov (United States)

    Yiatros, S.

    2017-11-01

    This article follows the timeline of the 'Nicosia International Airport: The Return' Integrated Design Project which was undertaken by Year 2 students of Civil Engineering and Geomatics at the Cyprus University of Technology in Cyprus. The Nicosia International Airport was the first and main airport of the Republic of Cyprus since its independence from the British Empire in 1960. The airport remains closed since the Turkish invasion of 1974 and is located in the buffer zone administered by the United Nations Peace-keeping Force in Cyprus. In this work, the innovative aspects of a project to inspire and train engineering students are highlighted, while special attention is given to the dissemination and outreach of the project through the social media. The attracted attention of national media and the project's impact on the local society had a cyclical effect, further inspiring students to work hard and act as responsible professional engineers. 'Nicosia International Airport: The Return' is a case study of how an academic engineering project can have societal impact, by inspiring students, engaging practitioners from a wide spectrum of disciplines, captivating the general public and raising the profile of Civil Engineering in the society.

  15. Design works organization during the IandC system upgrading on an operating VVER power plant from the general designer's standpoint

    International Nuclear Information System (INIS)

    Krepel, V.

    1997-01-01

    Two replacements of nuclear power plant instrumentation and control systems have already been implemented according to the project design of Energoprojekt: at the Mochovce WWER-440 and the Temelin WWER-1000 plants. In the present contribution the design problems encountered during the replacement are described, the causes of the problems are discussed, and a policy of organizing project design work for an instrumentation and control system replacement at an operating WWER power plant is established such as would avoid these problems. (A.K.)

  16. Ergonomic implementation and work station design for quilt manufacturing unit.

    Science.gov (United States)

    Vinay, Deepa; Kwatra, Seema; Sharma, Suneeta; Kaur, Nirmal

    2012-05-01

    average working heart rate values were found to reduced by performing the activity using improved technology followed by energy expenditure (6.99 kj/min), total cardiac cost of work (1037.95 beats), physiological cost of work (103.79 beats) and rate of perceived rate of exertion to the score of 2.6 Results of postural analysis that is change in motion at cervical region reveal that range of motion in case of extension was found beyond the normal range in existing setup where as it reduced to normal range in improved work station. The finding of the study concludes that to ensure safety and to reduce occupational health hazards while performing the activity, an ergonomically designed work station by introduction of improved technology option will be a right choice which also enhances the productivity.

  17. The MYRRHA project in Belgium: status after the two first years of basic engineering work - 15388

    International Nuclear Information System (INIS)

    Bruyn, D. de; Ait Abderrahim, H.; Baeten, P.; Leysen, P.

    2015-01-01

    The MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) project started in 1998 by SCK-CEN. MYRRHA is a Material Testing Reactor (MTR), based on the Accelerator Driven System (ADS) concept, for material and fuel research, for studying the feasibility of transmutation of Minor Actinides and Long-Lived Fission Products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. MYRRHA consists of a proton accelerator delivering its beam to a spallation target coupled to a subcritical core. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012-2015. The engineering company, which will handle this phase, has been selected and the works began in the late 2013. In the meantime we have made some progress in the licensing process. In this paper, we present the most recent developments of the MYRRHA design and our current experience with the Belgian safety authority FANC (Federal Agency for Nuclear Control)

  18. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  19. 1986 progress report on R and D work of the Nuclear Fusion Project (PKF)

    International Nuclear Information System (INIS)

    Kast, G.

    1987-03-01

    The Kernforschungszentrum Karlsruhe (KfK) and the Max-Planck-Institute for Plasma Physics, Garching, have joined to form the Entwicklungsgemeinschaft Kernfusion, and under this roof perform research work on the physical and technical conditions and requirements of using the energy from nuclear fusion, and to plan the design and the construction of the necessary equipment for future large-scale experiments. The activities of the KfK for the development of fusion devices with magnetic confinement have been concentrated in the Nuclear Fusion Project, which cooperates in the European Fusion Technology Programme, on the basis of an association agreement between KfK and Euratom, supported by the European Commission. Supplementary KfK contributions, studies in most cases, create a connection between various fields of work, and prepare the road for new tasks, which in the years to come will be found in the extension of the Fusion Technology Programme and the planning work for NET. The reports collected in this annual survey are contributions from KfK Institutes of the year 1986. An annex presents the Easks taken over by KfK within the Fusion Technology Programme of the EC, and notes on the KfK Institutes taking part in the particular activities facilitate reference to the individual, full-text reports. (orig.) [de

  20. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    Science.gov (United States)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  1. Individual, employment and psychosocial factors influencing walking to work: Implications for intervention design.

    Directory of Open Access Journals (Sweden)

    Emma J Adams

    Full Text Available Promoting walking for the journey to and from work (commuter walking is a potential strategy for increasing physical activity. Understanding the factors influencing commuter walking is important for identifying target groups and designing effective interventions. This study aimed to examine individual, employment-related and psychosocial factors associated with commuter walking and to discuss the implications for targeting and future design of interventions.1,544 employees completed a baseline survey as part of the 'Walking Works' intervention project (33.4% male; 36.3% aged <30 years. Multivariate logistic regression was used to examine the associations of individual (age, ethnic group, educational qualifications, number of children <16 and car ownership, employment-related (distance lived from work, free car parking at work, working hours, working pattern and occupation and psychosocial factors (perceived behavioural control, intention, social norms and social support from work colleagues with commuter walking.Almost half of respondents (n = 587, 49% were classified as commuter walkers. Those who were aged <30 years, did not have a car, had no free car parking at work, were confident of including some walking or intended to walk to or from work on a regular basis, and had support from colleagues for walking were more likely to be commuter walkers. Those who perceived they lived too far away from work to walk, thought walking was less convenient than using a car for commuting, did not have time to walk, needed a car for work or had always travelled the same way were less likely to be commuter walkers.A number of individual, employment-related and psychosocial factors were associated with commuter walking. Target groups for interventions to promote walking to and from work may include those in older age groups and those who own or have access to a car. Multi-level interventions targeting individual level behaviour change, social support within

  2. Individual, employment and psychosocial factors influencing walking to work: Implications for intervention design.

    Science.gov (United States)

    Adams, Emma J; Esliger, Dale W; Taylor, Ian M; Sherar, Lauren B

    2017-01-01

    Promoting walking for the journey to and from work (commuter walking) is a potential strategy for increasing physical activity. Understanding the factors influencing commuter walking is important for identifying target groups and designing effective interventions. This study aimed to examine individual, employment-related and psychosocial factors associated with commuter walking and to discuss the implications for targeting and future design of interventions. 1,544 employees completed a baseline survey as part of the 'Walking Works' intervention project (33.4% male; 36.3% aged employment-related (distance lived from work, free car parking at work, working hours, working pattern and occupation) and psychosocial factors (perceived behavioural control, intention, social norms and social support from work colleagues) with commuter walking. Almost half of respondents (n = 587, 49%) were classified as commuter walkers. Those who were aged work, were confident of including some walking or intended to walk to or from work on a regular basis, and had support from colleagues for walking were more likely to be commuter walkers. Those who perceived they lived too far away from work to walk, thought walking was less convenient than using a car for commuting, did not have time to walk, needed a car for work or had always travelled the same way were less likely to be commuter walkers. A number of individual, employment-related and psychosocial factors were associated with commuter walking. Target groups for interventions to promote walking to and from work may include those in older age groups and those who own or have access to a car. Multi-level interventions targeting individual level behaviour change, social support within the workplace and organisational level travel policies may be required in order to promote commuter walking.

  3. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  4. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  5. Task based design of a digital work environment (DWE for an academic community

    Directory of Open Access Journals (Sweden)

    Narayanan Meyyappan

    2002-01-01

    Full Text Available Task based design is considered one of the effective ways of designing functional software. It is generally accepted that tasks play an important role in system and user interface design. Identifying the user's tasks enables the designer to construct user interfaces reflecting the tasks' properties, including efficient usage patterns, easy-to-use interaction sequences, and powerful assistance features. In this paper, we present a prototype of a Digital Work Environment (DWE to support a task-oriented design to information access in a typical community of academic users. The resources in DWE are organized according to specific tasks performed by the research students and staff in the Division of Information Studies of Nanyang Technological University, Singapore. The tasks and resources were elicited based on the needs of faculty and students through interviews and focus groups. Examples of these tasks include preparation of a new course outline, setting of examination papers, preparation of reading lists and assignments, conducting literature reviews and writing dissertations. This paper discusses the problems of digital library users in an academic environment, highlights task oriented projects and focuses on the task of preparing and writing a Master dissertation. It highlights the importance of task based design in assisting and helping students and instructors from the time of selecting the research project to the time of submitting the final bound copies of the dissertation.

  6. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  7. Statement on current progress of the EPR project. Basic Design phase concluded

    International Nuclear Information System (INIS)

    Lamprecht, F.

    1997-01-01

    Against the background of expected increasing demand for electric power worldwide it is obvious that any existing technology for electricity generation will be required in the future to meet the demand, just as well as technology improvements. Nuclear industry's answer to this challenge are activities for further evolution of the PWR concept as a joint venture of France and Germany for development of the European Pressurized Water Reactor (EPR). The project participants are reactor manufacturers and operators of both countries as well as organisations responsible for reactor safety. The Basic Design phase which started in 1995, after prior definition of the common safety philosophy, has recently been concluded. The results have been presented at a meeting in October 1997 in Cologne, organised by KTG and SFEN, the countries' respective nuclear societies. The broad statement is that project work was successful in achieving two major objectives: A well-balanced safety concept, and a competitive design. (orig./CB) [de

  8. Theme II Joint Work Plan -2017 Collaboration and Knowledge Sharing on Large-scale Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Xiaoliang [World Resources Inst. (WRI), Washington, DC (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-25

    This effort is designed to expedite learnings from existing and planned large demonstration projects and their associated research through effective knowledge sharing among participants in the US and China.

  9. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  10. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  11. The projects of skunk works 75 years of Lockheed Martin's advanced development programs

    CERN Document Server

    Pace, Steve

    2016-01-01

    The Projects of Skunk Works examines 75 years of Lockheed Martin's advanced development programs, from jet fighters to missiles, heavy-lift helicopters, a lighter-than-air ship, drones, and a stealth boat.

  12. Citizen participation, indispensable factor in the generation of urban design projects that respond to the needs of users in Mexico

    Directory of Open Access Journals (Sweden)

    Flavio Franco Muñoz

    2015-09-01

    reflected in these programs planning of urban spaces really required citizenship also will access the urban design projects of these spaces, provided with sufficient basis to meet the needs of the population. The work done at the stage of urban planning in conjunction with the granting of citizenship will allow to build the urban space, structure, characteristics and performance that generate people to develop their urban activities properly in the field of city also expressed by the public would provide information that would give the necessary steps bases, studies to substantiate the project, zoning, and the draft scheme, which will be essential stages in the process of realization and implementation of the design project Urban performed.

  13. Evaluation of the Work-Place Cooperative Project in Geography Degrees at the University of Leeds.

    Science.gov (United States)

    Hogg, James

    1998-01-01

    Describes the context and objective of a Work-Place Cooperative Project (WPCP) established in the School of Geography at the University of Leeds in 1995. The project presents students with business, commerce, industry, and environmental research issues that have geographical dimensions. Includes a number of examples from the WPCP. (MJP)

  14. Ergonomic risk assessment with DesignCheck to evaluate assembly work in different phases of the vehicle development process.

    Science.gov (United States)

    Winter, Gabriele; Schaub, Karlheinz G; Großmann, Kay; Laun, Gerhard; Landau, Kurt; Bruder, Ralph

    2012-01-01

    Occupational hazards exist, if the design of the work situation is not in accordance with ergonomic design principles. At assembly lines ergonomics is applied to the design of work equipment and tasks and to work organisation. The ignoring of ergonomic principles in planning and design of assembly work leads to unfavourable working posture, action force and material handling. Disorders of the musculoskeletal system are of a common occurrence throughout Europe. Musculoskeletal disorders are a challenge against the background of disabled workers. The changes in a worker's capability have to be regarded in the conception of redesigned and new assembly lines. In this way ergonomics becomes progressively more important in planning and design of vehicles: The objective of ergonomic design in different stages of the vehicles development process is to achieve an optimal adaptation of the assembly work to workers. Hence the ergonomic screening tool "Design Check" (DC) was developed to identify ergonomic deficits in workplace layouts. The screening-tool is based on the current ergonomic state of the art in the design of physical work and relevant EU legal requirements. It was tested within a federal German research project at selected work stations at the assembly lines at Dr.-Ing. h.c. F. Porsche AG / Stuttgart. Meanwhile the application of the screening-tool DC is transferred in other parts of the Porsche AG, Stuttgart. It is also realized as an ergonomic standard method to perform assembly work in different phases of the vehicle development process.

  15. Win-Win-Win: Reflections from a Work-Integrated Learning Project in a Non-Profit Organization

    Directory of Open Access Journals (Sweden)

    Dale C MacKrell

    2016-05-01

    Full Text Available This paper reports on the educational aspects of an information systems work-integrated learning (WIL capstone project for an organization which operates to alleviate homelessness in the Australian non-profit sector. The methodology adopted for the study is Action Design Research (ADR which draws on action research and design research as a means for framing a project's progress. Reflective insights by the project stakeholders, namely, students, academics, and the non-profit client, reveal a curriculum at work through internal features of the organization; personal features of the participants and features of the external environment. Preliminary findings suggest that students in a WIL project for a non-profit are highly engaged, especially when they become aware of the project’s social value. As well, the improvement of professional skills and emotional intelligence by students is more likely in real-life practice settings than in other less authentic WIL activities, equipping graduates for the workforce with both strong disciplinary and generic skills. Win-win-win synergies through project collaboration represent worthwhile outcomes to education, industry and research.

  16. Calculator: A Hardware Design, Math and Software Programming Project Base Learning

    Directory of Open Access Journals (Sweden)

    F. Criado

    2015-03-01

    Full Text Available This paper presents the implementation by the students of a complex calculator in hardware. This project meets hardware design goals, and also highly motivates them to use competences learned in others subjects. The learning process, associated to System Design, is hard enough because the students have to deal with parallel execution, signal delay, synchronization … Then, to strengthen the knowledge of hardware design a methodology as project based learning (PBL is proposed. Moreover, it is also used to reinforce cross subjects like math and software programming. This methodology creates a course dynamics that is closer to a professional environment where they will work with software and mathematics to resolve the hardware design problems. The students design from zero the functionality of the calculator. They are who make the decisions about the math operations that it is able to resolve it, and also the operands format or how to introduce a complex equation into the calculator. This will increase the student intrinsic motivation. In addition, since the choices may have consequences on the reliability of the calculator, students are encouraged to program in software the decisions about how implement the selected mathematical algorithm. Although math and hardware design are two tough subjects for students, the perception that they get at the end of the course is quite positive.

  17. How is the artist role affected when artists are participating in projects in work life?

    Science.gov (United States)

    Stenberg, Henrik

    2016-01-01

    In Sweden, during the last decade, the artist has come to function as a creative resource in workplaces. There are two organisations, Skiss (Contemporary Artist in the Contemporary Society) and Airis (Artist in Residence), that organise projects for artists and coworkers. These projects are intended to have a positive effect on the well-being of organisations and their employees through artistic means, and the artist often focuses on the social interaction between the employees in their work. The artists' work involves frequent interaction with coworkers. The aim of this article was to describe how visual artists' roles as artists are affected by their engagement in artistic and social projects at workplaces in Sweden. The focus in the article is on the social interaction between artists and employees. The study is a qualitative narrative interview study with fine artists participating in different projects in work life. Since the artist's intervention is usually directed towards social relations in the workplaces, a social perspective on well-being is from a micro-sociological point of view. The categories in the interviews were how the artists worked with the projects, how the social interaction between artists and coworkers worked out, and how the artists evaluated the projects in relation to their ambitions. The results show that, many times, the artistic projects promote well-being in organisations and to some extent benefit the artist, but that the ability of the artists to actually function as artists can be problematic.

  18. RFP to work on formation flying capabilities for spacecrafts for the GRACE project

    DEFF Research Database (Denmark)

    Riis, Troels; Thuesen, Gøsta; Kilsgaard, Søren

    1999-01-01

    The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts.......The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts....

  19. Voices from the "Working Lives" Project: The Push-Pull of Work and Care

    Science.gov (United States)

    Fehring, Heather; Herring, Katherine

    2012-01-01

    A recent policy direction in many OECD countries has been to increase workforce participation for women of childbearing age; a policy direction which seemingly runs counter to a need for improved work-life balance for women themselves. This article explores the impact of this somewhat contradictory "push-pull" of policy by examining some…

  20. Enjeux de la médiatisation du travail coopératif distribué dans les équipes de projets de conception Stakes of Computer Supported Cooperative Work in Design Project Teams Desafíos que presenta la mediatización del trabajo cooperativo distribuido en los equipos de proyectos de diseño

    Directory of Open Access Journals (Sweden)

    Jacqueline Vacherand-Revel

    2007-10-01

    Full Text Available Les mutations organisationnelles que connaissent de nombreuses entreprises globalisées encouragent le développement de nouvelles pratiques collectives de travail pour s’affranchir de l’espace et du temps et mettre en synergie des compétences dispersées géographiquement. L’objet de cet article est d’examiner les spécificités du travail coopératif distribué au sein d’équipes qui réalisent des projets de conception d’envergure. Une forte coopération entre les coéquipiers et la gestion de multiples activités coopératives distribuées nécessitent une utilisation massive des technologies de l’information et de la communication pour interagir régulièrement et travailler ensemble dans des espaces virtuels partagés. Avec de telles conditions de travail, les enjeux sont nombreux et les risques pour la santé des coéquipiers ne doivent pas être négligés. Dans cette perspective, nous examinons les risques liés à la fragmentation du travail, à sa dispersion et les différentes tensions et surcharges qui pèsent sur le travailleur intellectuel et peuvent présenter des effets délétères sur la santé.The organizational changes that many global companies are undergoing are fostering the development of new collective work practices freeing workers from the constraints of space and time and marshalling geographically dispersed skills. The object of this article is to examine the specificities of distributed cooperative work within teams that carry out large-scale design projects. Close cooperation between the team members and the management of multiple distributed cooperative activities require a massive use of information and communication technologies so that they can interact regularly and work together in shared virtual spaces. With such working conditions, there are many issues, and the health risks must not be overlooked. From this perspective, we examine the risks of fragmented work, its dispersion, and various

  1. Working Towards Unified Safety Design Criteria for Modular High Temperature Gas-cooled Reactor Designs

    International Nuclear Information System (INIS)

    Reitsma, Frederik; Silady, Fred; Kunitomi, Kazuhiko

    2014-01-01

    The Nuclear Power Development Section of the IAEA recently received approval for a Coordinated Research Project (CRP) to investigate and make proposals on modular High Temperature Gas-cooled Reactor (HTGR) Safety design criteria. It is expected that these criteria would consider past experience and existing safety standards in the light of modular HTGR material and design characteristics to propose safety design criteria. It will consider the deterministic and risk-informed safety design standards that apply to the wide spectrum of Off- normal events under development worldwide for existing and planned HTGRs. The CRP would also take into account lessons from the Fukushima Daiichi accident, clarifying the safety approach and safety evaluation criteria for design and beyond design basis events, including those events that can affect multiple reactor modules and/or are dependent on the application proximate to the plant site. (e. g., industrial process steam/heat). The logical flow of criteria is from the fundamental inherent safety characteristics of modular HTGRs and associated expected performance characteristics, to the safety functions required to ensure those characteristics during the wide spectrum of Off-normal events, and finally to specific criteria related to those functions. This is detailed in the paper with specific examples included of how it may be applied. The results of the CRP will be made available to the member states and HTGR community. (author)

  2. KBS-3H. Summary report of work done during Basic Design

    International Nuclear Information System (INIS)

    Thorsager, Peder; Lindgren, Erik

    2004-09-01

    The aim of this report is to give a brief specification of achieved knowledge from Basic Design. The report will also constitute the basis for decision to continue the project or not with detail design and manufacturing of deposition equipment and other equipment necessary for realization of full scale demonstrations of horizontal deposition in long horizontal drifts at Aespoe during the period 2004-2007. The work with the project has continued during 2004 with mainly preparation of Request for Proposal (RFP) documents for the detailed design and manufacturing of the deposition equipment. Further, SKB has signed a contract with a drilling company for drilling of the horizontal deposition drifts late 2004 at Aespoe HRL. The work with the buffer issues and the safety case for the KBS-3H concept has also continued during 2004. During the work with the RFP documents for the deposition equipment and excavation of deposition drifts, some modifications or changes have been done that is not documented in this report. The main changes in the KBS-3H projects are the following: 1. The excavation of the deposition drift at Aespoe HRL will not be done with the Wassara water hammer technology as described in the report but with blind raiseboring technology instead. 2. The shell of the super container has been redesigned and also the top and bottom plate of the container are perforated and the thickness has been reduced to 8 mm, the same thickness as the container shell, and the designs of the container feet are modified. The use of an electromagnet for holding the super container during the deposition process is therefore no longer feasible with these thin end plates. The electromagnet is now replaced with a mechanical gripper on the deposition machine. These grippes are holding the front feet of the super container during the deposition process. The reader should therefore be aware that some of the description and conclusion from the Basic Design may have changed somewhat after

  3. KBS-3H. Summary report of work done during Basic Design

    Energy Technology Data Exchange (ETDEWEB)

    Thorsager, Peder [Ramboell Sverige AB, Stockholm (Sweden); Lindgren, Erik [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    2004-09-01

    The aim of this report is to give a brief specification of achieved knowledge from Basic Design. The report will also constitute the basis for decision to continue the project or not with detail design and manufacturing of deposition equipment and other equipment necessary for realization of full scale demonstrations of horizontal deposition in long horizontal drifts at Aespoe during the period 2004-2007. The work with the project has continued during 2004 with mainly preparation of Request for Proposal (RFP) documents for the detailed design and manufacturing of the deposition equipment. Further, SKB has signed a contract with a drilling company for drilling of the horizontal deposition drifts late 2004 at Aespoe HRL. The work with the buffer issues and the safety case for the KBS-3H concept has also continued during 2004. During the work with the RFP documents for the deposition equipment and excavation of deposition drifts, some modifications or changes have been done that is not documented in this report. The main changes in the KBS-3H projects are the following: 1. The excavation of the deposition drift at Aespoe HRL will not be done with the Wassara water hammer technology as described in the report but with blind raiseboring technology instead. 2. The shell of the super container has been redesigned and also the top and bottom plate of the container are perforated and the thickness has been reduced to 8 mm, the same thickness as the container shell, and the designs of the container feet are modified. The use of an electromagnet for holding the super container during the deposition process is therefore no longer feasible with these thin end plates. The electromagnet is now replaced with a mechanical gripper on the deposition machine. These grippes are holding the front feet of the super container during the deposition process. The reader should therefore be aware that some of the description and conclusion from the Basic Design may have changed somewhat after

  4. Community interviews task report: Working draft: BWIP [Basalt Waste Isolation Project] Repository Project

    International Nuclear Information System (INIS)

    Bolton, P.A.

    1987-11-01

    The socioeconomic program for the Basalt Waste Isolation Project (BWIP) requires the collection of information about economic, social and cultural conditions, demographic, housing and settlement patterns, and the provision of public services and facilities in order to monitor and assess the impacts of the project on the study area. Much of the information needed by the socioeconomic program is compiled, maintained, and used by officials or staff members of local, regional, state, or tribal agencies or organizations. Because much of this information is prepared for internal use, the documents are often not published or advertised and it can be difficult for researchers to identify many obscure, yet useful, sources of information. In order to identify and gain access to this information, it is often most efficient to talk directly with officials and staff members of pertinent agencies or organizations who may have knowledge of these documents or who may have useful information themselves. Consequently, interviews in the study communities with persons knowledgeable about the socioeconomic or sociocultural characteristics of the area constitute an important source of data for the socioeconomic program. In addition to identifying various data sources, these interviews provide a mechanism for understanding and interpreting those data. Knowledge of specific local conditions is often necessary to correctly interpret quantitative data. The purpose of this paper is to summarize the objectives of the community interviews task and the general methods that will be used in conducting the community interviews. 3 refs

  5. Further design work on a repository in a salt dome

    International Nuclear Information System (INIS)

    Hamstra, J.; Janssen, L.G.L.

    1985-01-01

    The report presents the cost estimate and the work plan for the construction of a repository, to be mined in a medium-size salt dome for the simultaneous disposal of different categories of solid radioactive wastes. The repository is designed for all categories of waste from 40 years of operation of 25 nuclear power stations of 1000 MWe each, including the decommissioning waste from these stations as well as all the radioactive wastes from the hospitals and laboratories during a hundred-year period. The cost estimate includes preparation of a site, the construction, operation and abandonment of that repository. Moreover, an outline has been presented for a future updating and optimization study of the concept

  6. Integrating Project Management, Product Design with Industry Sponsored Projects provides Stimulating Senior Capstone Experiences

    Directory of Open Access Journals (Sweden)

    Phillip A. Sanger

    2011-07-01

    Full Text Available

    Abstract ¾ Many students are uncomfortable with real world engineering problems where needs and requirements must be concretely defined and the selection of design solutions is not black and white. This paper describes a two semester, multi-disciplinary senior capstone project for students from three Engineering and Technology Department programs (electrical engineering, electrical and computer engineering technology, and engineering technology that brings together the tools of project management and the creative product development process into industry sponsored projects.  The projects are fully integrated with the Center for Rapid Product Realization with its dual goals of economic development and enhanced learning.  The stage/gate development process is used with six formal reviews covering the development of the proposal through to the fabrication and testing of the project’s output.  Over the past four years thirty five (35 projects have been undertaken with students getting an exciting

  7. DESIGN OF SMALL AUTOMATION WORK CELL SYSTEM DEMONSTRATIONS

    International Nuclear Information System (INIS)

    TURNER, C.; PEHL, J.

    2000-01-01

    The introduction of automation systems into many of the facilities dealing with the production, use and disposition of nuclear materials has been an ongoing objective. Many previous attempts have been made, using a variety of monolithic and, in some cases, modular technologies. Many of these attempts were less than successful, owing to the difficulty of the problem, the lack of maturity of the technology, and over optimism about the capabilities of a particular system. Consequently, it is not surprising that suggestions that automation can reduce worker Occupational Radiation Exposure (ORE) levels are often met with skepticism and caution. The development of effective demonstrations of these technologies is of vital importance if automation is to become an acceptable option for nuclear material processing environments. The University of Texas Robotics Research Group (UTRRG) has been pursuing the development of technologies to support modular small automation systems (each of less than 5 degrees-of-freedom) and the design of those systems for more than two decades. Properly designed and implemented, these technologies have a potential to reduce the worker ORE associated with work in nuclear materials processing facilities. Successful development of systems for these applications requires the development of technologies that meet the requirements of the applications. These application requirements form a general set of rules that applicable technologies and approaches need to adhere to, but in and of themselves are generally insufficient for the design of a specific automation system. For the design of an appropriate system, the associated task specifications and relationships need to be defined. These task specifications also provide a means by which appropriate technology demonstrations can be defined. Based on the requirements and specifications of the operations of the Advanced Recovery and Integrated Extraction System (ARIES) pilot line at Los Alamos National

  8. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  9. Work Models in the Design Process for House Interior and Exterior: Physical or Virtual?

    Science.gov (United States)

    Bradecki, Tomasz; Uherek-Bradecka, Barbara

    2017-10-01

    The article presents the effects of research on different types of models of single family houses and multifamily houses. Exterior layout and interior functional layout are the main drivers for the final result of a design. Models are an important medium for presentation of architectural designs and play a pivotal role in explaining the first idea to people and potential clients. Although 3D models have unlimited possibilities of representation, some people cannot understand or ‘feel’ the designed space. The authors try to test how to combine the interior and the exterior in a single synthetic model. Several models of different houses have been presented in the article. All the case studies were developed with physical models, 3D models, and 2D hand sketches. The main focus of the work with the models was to achieve a coherent vision for future feeling of open space in designed houses. The research shows how synthetic models might be helpful in the design process. The research was carried in the URBAN model research group (urbanmodel.org, Gliwice, Poland) that consists of academic researchers and architects. The models reflect architectural experience gathered by the authors during their work on theoretical models, architectural projects and by supervision on site during construction site visits. Conclusions might be helpful for developers, architects, interior designers and architecture students.

  10. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  11. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  12. Position Paper: Designing Complex Systems to Support Interdisciplinary Cognitive Work

    Science.gov (United States)

    Greene, Melissa T.; Papalambros, Panos Y.; Mcgowan, Anna-Maria R.

    2016-01-01

    The paper argues that the field we can call cognitive science of interdisciplinary collaboration is an important area of study for improving design of Large-Scale Complex Systems (LaCES) and supporting cognitive work. The paper mostly raised questions that have been documented in earlier qualitative analysis studies, and provided possible avenues of exploration for addressing them. There are likely further contributions from additional disciplines beyond those mentioned in this paper that should be considered and integrated into such a cognitive science framework. Knowledge and awareness of various perspectives will help to inform the types of interventions available for improving LaCES design and functionality. For example, a cognitive interpretation of interdisciplinary collaborations in LaCES elucidated the need for a "translator" or "mediator" in helping subject matter experts to transcend language boundaries, mitigate single discipline bias, support integrative activities, and correct misaligned objectives. Additional research in this direction is likely to uncover similar gaps and opportunities for improvements in practice.

  13. Work and Home Neighborhood Design and Physical Activity.

    Science.gov (United States)

    Carlson, Jordan A; Frank, Lawrence D; Ulmer, Jared; Conway, Terry L; Saelens, Brian E; Cain, Kelli L; Sallis, James F

    2018-01-01

    To investigate relations of perceived worksite neighborhood environments to total physical activity and active transportation, over and above home neighborhood built environments. Observational epidemiologic study. Baltimore, Maryland-Washington, DC, and Seattle-King County, Washington metropolitan areas. One thousand eighty-five adults (mean age = 45.0 [10.2]; 46% women) recruited from 32 neighborhoods stratified by high/low neighborhood income and walkability. The Neighborhood Environment Walkability Survey assessed perceptions of worksite and home neighborhood environments. Accelerometers assessed total moderate-to-vigorous physical activity (MVPA). The International Physical Activity Questionnaire assessed total active transportation and active transportation to and around work. Mixed-effects regression tested relations of home and worksite neighborhood environments to each physical activity outcome, adjusted for demographics. Home and worksite mixed land use and street connectivity had the most consistent positive associations with physical activity outcomes. Worksite traffic and pedestrian safety were also associated with multiple physical activity outcomes. The worksite neighborhood explained additional variance in physical activity outcomes than explained by the home neighborhood. Worksite and home neighborhood environments interacted in explaining active transportation to work, with the greatest impacts occurring when both neighborhoods were activity supportive. Both worksite and home neighborhood environments were independently related to total MVPA and active transportation. Community design policies should target improving the physical activity supportiveness of worksite neighborhood environments and integrating commercial and residential development.

  14. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  15. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  16. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  17. Shift work and quality of sleep: effect of working in designed dynamic light.

    Science.gov (United States)

    Jensen, Hanne Irene; Markvart, Jakob; Holst, René; Thomsen, Tina Damgaard; Larsen, Jette West; Eg, Dorthe Maria; Nielsen, Lisa Seest

    2016-01-01

    To examine the effect of designed dynamic light on staff's quality of sleep with regard to sleep efficiency, level of melatonin in saliva, and subjective perceptions of quality of sleep. An intervention group working in designed dynamic light was compared with a control group working in ordinary institutional light at two comparable intensive care units (ICUs). The study included examining (1) melatonin profiles obtained from saliva samples, (2) quality of sleep in terms of sleep efficiency, number of awakenings and subjective assessment of sleep through the use of sleep monitors and sleep diaries, and (3) subjective perceptions of well-being, health, and sleep quality using a questionnaire. Light conditions were measured at both locations. A total of 113 nurses (88 %) participated. There were no significant differences between the two groups regarding personal characteristics, and no significant differences in total sleep efficiency or melatonin level were found. The intervention group felt more rested (OR 2.03, p = 0.003) and assessed their condition on awakening as better than the control group (OR 2.35, p = 0.001). Intervention-ICU nurses received far more light both during day and evening shifts compared to the control-ICU. The study found no significant differences in monitored sleep efficiency and melatonin level. Nurses from the intervention-ICU subjectively assessed their sleep as more effective than participants from the control-ICU.

  18. Spent nuclear fuel project design basis capacity study

    Energy Technology Data Exchange (ETDEWEB)

    Cleveland, K.J.

    1996-09-09

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  19. Exploring factors that influence work analysis data: A meta-analysis of design choices, purposes, and organizational context.

    Science.gov (United States)

    DuVernet, Amy M; Dierdorff, Erich C; Wilson, Mark A

    2015-09-01

    Work analysis is fundamental to designing effective human resource systems. The current investigation extends previous research by identifying the differential effects of common design decisions, purposes, and organizational contexts on the data generated by work analyses. The effects of 19 distinct factors that span choices of descriptor, collection method, rating scale, and data source, as well as project purpose and organizational features, are explored. Meta-analytic results cumulated from 205 articles indicate that many of these variables hold significant consequences for work analysis data. Factors pertaining to descriptor choice, collection method, rating scale, and the purpose for conducting the work analysis each showed strong associations with work analysis data. The source of the work analysis information and organizational context in which it was conducted displayed fewer relationships. Findings can be used to inform choices work analysts make about methodology and postcollection evaluations of work analysis information. (c) 2015 APA, all rights reserved).

  20. Supplier integration in product development: A matter of designing the project structure

    Directory of Open Access Journals (Sweden)

    Mike Danilovic

    2007-11-01

    Full Text Available In product development close collaboration between systems integrators and suppliers is important. The purpose of this article is to investigate the impact of the work breakdown structure (WBS and work packages (WPs in product development on the possibility of carrying through the strategy of supplier involvement into collaborative practice and to investigate how supplier involvement can be improved by altering the design of collaborative WBS and WP structures. Dependence Structure Matrix (DSM is introduced in order to analyse, visualise and manage interdependencies, in terms of information exchange between the systems integrator and supplier. This article shows how DSM can support the alternative design of integrated and collaborative WBS and integrated WPs following the logic of dependencies and the flow of information in order to support a strategy focusing on integration of suppliers on project and team level.