  1. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  2. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  3. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  4. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  5. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  6. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  7. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  8. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  9. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  10. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  11. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    between knowledge and technology through knowledge communication processes, cultural and rhetorical contexts. This connection is examined from a process point of view through the development of project goals and objectives to situate technology. The data comes from a Project Management course in which...... the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...... the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication. Keywords: Knowledge Communication, Knowledge Management, Socio-Technical Design, Project Management....

  12. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  13. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  14. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  15. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  16. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  17. Systematic design for trait introgression projects.

    Science.gov (United States)

    Cameron, John N; Han, Ye; Wang, Lizhi; Beavis, William D

    2017-10-01

    Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into Pareto optimality plots associated with any arbitrary selection strategy. The Pareto plots can be used to make rational decisions concerning the trade-offs between maximizing the probability of success while minimizing costs and time. The systematic rigor associated with a cost, time and probability of success (CTP) framework is well suited to designing TI projects that require dynamic decision making. The CTP framework also revealed that previously identified 'best' strategies can be improved to be at least twice as effective without increasing time or expenses.

  18. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  19. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    Science.gov (United States)

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  20. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  1. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  2. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  3. 34 CFR 637.13 - What are design projects?

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.13 What are design projects? (a) Design... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13...

  4. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    experiences and expertise to guide the students’ decisions in relation to the design project. This paper focuses on project supervision in the context of design education – and more specifically on how this supervision is unfolded in a Problem Based Learning culture. The paper explores the supervisor......’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop......In design there is a long tradition for apprenticeship, as well as tradition for learning through design projects. Today many design educations are positioned within the University context, and have to be aligned with the learning culture and structure, which they represent. This raises a specific...

  5. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  6. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  7. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... and the Aarhus School of Business, University of Aarhus, Denmark. The analysis demonstrates the potential of knowledge communication concepts for social technical design and highlights the cultural context of the designers as a key factor to consider in socio-technical design....

  8. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  9. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  10. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  11. Learning from participatory design projects across industries

    DEFF Research Database (Denmark)

    Broberg, Ole; Souza da Conceição, Carolina

    2017-01-01

    Summative Statement: A preliminary framework for participatory design projects (PDP) was developed based on a retrospective analysis of five PDPs across different industries. The framework may serve as a guidance for planning and conducting PDPs. Problem statement: A growing number of experiences...... with participatory design or participatory ergonomics projects have been gained within the field of macro-ergonomics. It is suggested that the Participatory Ergonomics Framework (PEF) validated by Haines et al. (2002) needs to be updated based on these experiences and hence more focussed on design activities....... Research Objective / Question: The objective of this study was to update and design-orient the PEF based on experiences with PDPs within the last ten years. Methodology: Five participatory design projects across different industries were systematically analyzed and compared in order to develop a framework...

  12. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  13. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  14. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  15. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  16. Project X: Accelerator Reference Design

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, Stephen D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-06-20

    Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible

  17. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  18. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  19. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  20. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  1. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  2. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  3. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  4. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  5. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  6. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  7. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  8. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  9. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  10. Various advanced design projects promoting engineering education

    Science.gov (United States)

    1994-01-01

    The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

  11. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  12. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  13. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  14. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  15. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  16. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  17. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  18. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  19. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  20. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  1. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  2. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  3. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Singer, M.

    2017-09-01

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  4. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Singer, Mark R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-09-28

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

  5. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  6. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  7. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  8. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  9. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  10. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  11. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  12. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  13. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  14. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  15. A series of student design projects for improving and modernizing safety helmets

    NARCIS (Netherlands)

    Beurden, van K.M.M. (Karin); Boer, de J. (Johannes); Stilma, M. (Margot); Teeuw, W.B. (Wouter)

    2014-01-01

    The Saxion Research Centre for Design and Technology employs many students during research projects. This paper discusses a series of student design projects on safety helmets in the Safety@Work project. At construction sites workers are required to wear personal protective equipment during their

  16. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  17. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  18. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  19. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  20. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  1. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  2. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  3. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  4. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  5. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  6. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  7. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  8. Capstone Engineering Design Projects for Community Colleges

    Science.gov (United States)

    Walz, Kenneth A.; Christian, Jon R.

    2017-01-01

    Capstone engineering design courses have been a feature at research universities and four-year schools for many years. Although such classes are less common at two-year colleges, the experience is equally beneficial for this population of students. With this in mind, Madison College introduced a project-based Engineering Design course in 2007.…

  9. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  10. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  11. Error begat error: design error analysis and prevention in social infrastructure projects.

    Science.gov (United States)

    Love, Peter E D; Lopez, Robert; Edwards, David J; Goh, Yang M

    2012-09-01

    Design errors contribute significantly to cost and schedule growth in social infrastructure projects and to engineering failures, which can result in accidents and loss of life. Despite considerable research that has addressed their error causation in construction projects they still remain prevalent. This paper identifies the underlying conditions that contribute to design errors in social infrastructure projects (e.g. hospitals, education, law and order type buildings). A systemic model of error causation is propagated and subsequently used to develop a learning framework for design error prevention. The research suggests that a multitude of strategies should be adopted in congruence to prevent design errors from occurring and so ensure that safety and project performance are ameliorated. Copyright © 2011. Published by Elsevier Ltd.

  12. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  13. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  14. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  15. A biotic game design project for integrated life science and engineering education.

    Science.gov (United States)

    Cira, Nate J; Chung, Alice M; Denisin, Aleksandra K; Rensi, Stefano; Sanchez, Gabriel N; Quake, Stephen R; Riedel-Kruse, Ingmar H

    2015-03-01

    Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM) education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course). We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  16. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  17. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  18. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  19. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  20. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  1. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  2. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  3. A biotic game design project for integrated life science and engineering education.

    Directory of Open Access Journals (Sweden)

    Nate J Cira

    2015-03-01

    Full Text Available Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course. We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  4. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  5. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  6. Optical design of ultrashort throw liquid crystal on silicon projection system

    Science.gov (United States)

    Huang, Jiun-Woei

    2017-05-01

    An ultrashort throw liquid crystal on silicon (LCoS) projector for home cinema, virtual reality, and automobile heads-up display has been designed and fabricated. To achieve the best performance and highest-quality image, this study aimed to design wide-angle projection optics and optimize the illumination for LCoS. Based on the telecentric lens projection system and optimized Koehler illumination, the optical parameters were calculated. The projector's optical system consisted of a conic aspheric mirror and image optics using either symmetric double Gauss or a large-angle eyepiece to achieve a full projection angle larger than 155 deg. By applying Koehler illumination, image resolution was enhanced and the modulation transfer function of the image in high spatial frequency was increased to form a high-quality illuminated image. The partial coherence analysis verified that the design was capable of 2.5 lps/mm within a 2 m×1.5 m projected image. The throw ratio was less than 0.25 in HD format.

  7. User-inspired design methodology using Affordance Structure Matrix (ASM) for construction projects

    OpenAIRE

    Maheswari J. Uma; Charlesraj V. Paul C.; Battacharya Soma

    2017-01-01

    Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost am...

  8. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  9. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  10. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  11. Student-Designed Service-Learning Projects in an Undergraduate Neurobiology Course

    Directory of Open Access Journals (Sweden)

    Katharine V. Northcutt

    2015-12-01

    Full Text Available One of the challenges in teaching a service-learning course is obtaining student buy-in from all students in the course. To circumvent this problem, I have let students in my undergraduate Neurobiology course design their own service-learning projects at the beginning of the semester. Although this can be chaotic because it requires last-minute planning, I have made it successful through facilitating student communication in the classroom, requiring thorough project proposals, meeting with students regularly, and monitoring group progress through written reflection papers. Most of my students have strong opinions about the types of projects that they want to carry out, and many students have used connections that they have already made with local organizations. Almost all projects that students have designed to this point involve teaching basic concepts of neurobiology to children of various ages while simultaneously sparking their interest in science. Through taking ownership of the project and designing it such that it works well with their strengths, interests, and weekly schedule, students have become more engaged in service learning and view it as a valuable experience. Despite some class time being shifted away from more traditional assignments, students have performed equally well in the course, and they are more eager to talk with others about course concepts. Furthermore, the feedback that I have received from community partners has been excellent, and some students have maintained their work with the organizations.

  12. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  13. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  14. Industrial Sponsor Perspective on Leveraging Capstone Design Projects to Enhance Their Business

    Science.gov (United States)

    Weissbach, Robert S.; Snyder, Joseph W.; Evans, Edward R., Jr.; Carucci, James R., Jr.

    2017-01-01

    Capstone design projects have become commonplace among engineering and engineering technology programs. These projects are valuable tools when assessing students, as they require students to work in teams, communicate effectively, and demonstrate technical competency. The use of industrial sponsors enhances these projects by giving these projects…

  15. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  16. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  17. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  18. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    This paper aims to emphasize the necessity of introducing Project-Based Learning (PBL) to design enterprises in order to foster designers creativity and facilitate innovation of design enterprises. According to the literature review, creativity can be viewed as the first stage of innovation; PBL...

  19. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  20. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  1. Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

    Directory of Open Access Journals (Sweden)

    Lukumon Oyedele

    2012-11-01

    Full Text Available Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75, architects/engineers (0.21 ,and engineers/quantity surveyors (0.24. The percentagerank agreement factor (PRAF shows that the five mostimportant factors affecting quality are 'design changes'(78.9%; 'inadequate involvement of other professionalsduring the design stage' (78.9%; 'insufficient andunrealistic constraints of project cost' (71.1 %; 'poor levelof commitment to quality improvement among designprofessionals' (63.2%; and 'making design decisions oncost and not value of work' (55.3%. The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.

  2. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  3. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  4. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  5. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  6. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  7. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  8. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  9. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  10. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  11. Implementing a Student-Designed Green Chemistry Laboratory Project in Organic Chemistry

    Science.gov (United States)

    Graham, Kate J.; Jones, T. Nicholas; Schaller, Chris P.; McIntee, Edward J.

    2014-01-01

    A multiweek organic chemistry laboratory project is described that emphasizes sustainable practices in experimental design. An emphasis on student-driven development of the project is meant to mirror the independent nature of research. Students propose environmentally friendly modifications of several reactions. With instructor feedback, students…

  12. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.

  13. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  14. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  15. Project Lifespan-based Nonstationary Hydrologic Design Methods for Changing Environment

    Science.gov (United States)

    Xiong, L.

    2017-12-01

    Under changing environment, we must associate design floods with the design life period of projects to ensure the hydrologic design is really relevant to the operation of the hydrologic projects, because the design value for a given exceedance probability over the project life period would be significantly different from that over other time periods of the same length due to the nonstationarity of probability distributions. Several hydrologic design methods that take the design life period of projects into account have been proposed in recent years, i.e. the expected number of exceedances (ENE), design life level (DLL), equivalent reliability (ER), and average design life level (ADLL). Among the four methods to be compared, both the ENE and ER methods are return period-based methods, while DLL and ADLL are risk/reliability- based methods which estimate design values for given probability values of risk or reliability. However, the four methods can be unified together under a general framework through a relationship transforming the so-called representative reliability (RRE) into the return period, i.e. m=1/1(1-RRE), in which we compute the return period m using the representative reliability RRE.The results of nonstationary design quantiles and associated confidence intervals calculated by ENE, ER and ADLL were very similar, since ENE or ER was a special case or had a similar expression form with respect to ADLL. In particular, the design quantiles calculated by ENE and ADLL were the same when return period was equal to the length of the design life. In addition, DLL can yield similar design values if the relationship between DLL and ER/ADLL return periods is considered. Furthermore, ENE, ER and ADLL had good adaptability to either an increasing or decreasing situation, yielding not too large or too small design quantiles. This is important for applications of nonstationary hydrologic design methods in actual practice because of the concern of choosing the emerging

  16. Project Portal User-Centered Design and Engineering Report

    Science.gov (United States)

    2016-06-01

    TECHNICAL REPORT 3013 June 2016 Project Portal User-Centered Design and Engineering Report Deborah Gill-Hesselgrave Veronica Higgins Sarah...Design and Engineering Branch Under authority of Chris Raney, Head Command and Control Technology and Experiments Division iii EXECUTIVE...navy.mil  Christian Szatkowski christian.szatkowski@navy.mil  Roni Higgins roni.higgins@navy.mil  Jake Viraldo jacob.viraldo@navy.mil B

  17. A Case Study of User-Centred Design in Four Swiss RUP Projects

    Directory of Open Access Journals (Sweden)

    Ljiljana Vukelja

    2010-01-01

    Full Text Available We analysed four Rational Unified Process (RUP projects in Switzerland that identified themselves as following a user-centred approach. Grounded theory served for analysis of 12 interviews with software developers, project managers, and UI specialists. For each professional group we analysed their work context, motivations, work practices, and strategies used to overcome the obstacles to user-centred design. Results show that end users did not participate in the projects. Instead of working directly with end users, participants used data from marketing research or consulted colleagues from other departments. Prototypes played an important role. We suggest the following remedies: (1 developing methods for easy integration of existing company knowledge about products with usability features, (2 professionalising UI design by educating project stakeholders in standard UI design, (3 creating an approved pool of company's personas for UI specialists' work, and (4 educating customers on their right to get good user interfaces.

  18. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  19. Optimized design for the scattering with angular limitation in projection electron-beam lithography based electron projection system

    International Nuclear Information System (INIS)

    Xiu, K.; Gibson, J. M.

    2000-01-01

    We investigate the design for a scattering with angular limitation in projection electron-beam lithography (SCALPEL) based electron projection system with a demagnification of -4. By a ''field-flip'' process we can construct a doublet in which the magnetic field has a flat feature in most of the optic column but opposite sign at two sides connected by a sharp transition region. Such a theoretical model can give a near zero chromatic aberration of rotation and much smaller field curvature and astigmatism. Compared with the conventional doublet, the total image blur caused by aberrations at 1/√(2) mm off-axis distance and 1.5 mrad semiangle aperture at the mask side is about only 24 nm for a column length of 400 mm. A shorter column, less than the current 400 mm, is also favored for further reducing the total aberration. These guarantee that we can choose a much larger aperture angle (compared with present 0.5 mrad) and beam current density in such a SCALPEL projection system to achieve higher throughput while still maintaining current resolution. A practical issue for possible magnetic lens design is also discussed. (c) 2000 American Vacuum Society

  20. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  1. GIS Project Design: Brainstorming & Ideation Workshop

    OpenAIRE

    Garofalo, Frank

    2015-01-01

    Who should attend: Do you have a new project or existing project, and looking to generate some new ideas? Come with a project in mind or just come to learn some new collaboration and brainstorming techniques. What participants will learn… techniques for: Working with others to create a common direction and vision, then generating alignment Evaluating current state situations, strengths, complications and implications Identifying and forming consensus on key target audiences Generating ide...

  2. Impediments to User Gains: Experiences from a Critical Participatory Design Project

    DEFF Research Database (Denmark)

    Bossen, Claus; Dindler, Christian; Iversen, Ole Sejer

    2012-01-01

    interviews with participants in a project aimed at developing technology that fosters engaging museum experiences, and rethinking cultural heritage communication. Despite the use of established PD techniques by experienced PD practitioners, a significant number of frustrations relating to the PD process were...... prominent in the research study. Based on these findings, we provide an analysis of impediments for users gains in PD projects: Differences between aims were unresolved, absence of a shared set-up for collaboration and different conceptions of technology.......Actual studies of user gains from involvement in design processes are few, although a concern for users’ gains is a core characteristic of participatory design (PD). We explore the question of user gains through a retrospective evaluation of a critical PD project. We conducted ten qualitative...

  3. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  4. IPAD project overview

    Science.gov (United States)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  5. Delft Aerospace Design Projects 2016 : Inspring Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2016-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2015 and the Spring Design Synthesis Exercise of 2016, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  6. Delft Aerospace Design Projects 2014 : New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2014-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2013 and the Spring Design Synthesis Exercise of 2014, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  7. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  8. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  9. Design fixation and cooperative learning in elementary engineering design project: A case study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  10. An intelligent and interactive carpet role of design in a textile innovation project

    NARCIS (Netherlands)

    Deckers, E.J.L.; Stouw, van der B.; Peutz, J.

    2012-01-01

    This paper presents an ongoing innovation project on the development of an intelligent and interactive carpet called PeR+, short for Perception Rug Plus. This design-research project is a collaboration between an international flooring company, DESSO, and the Department of Industrial Design at the

  11. Integration and the hold-up problem in the design organization for engineering projects

    NARCIS (Netherlands)

    Zerjav, Vedran; Hartmann, Timo; Javernick-Will, A.; Chinowsky, P.

    2012-01-01

    The paper presents a perspective of the design organization in engineering projects based on the economic concept of the hold-up problem. By integrating the economic theories on the boundaries of organizations into the existing knowledge on design in engineering projects, the paper hypothesizes a

  12. Integrating Project Management, Product Design with Industry Sponsored Projects provides Stimulating Senior Capstone Experiences

    Directory of Open Access Journals (Sweden)

    Phillip A. Sanger

    2011-07-01

    Full Text Available

    Abstract ¾ Many students are uncomfortable with real world engineering problems where needs and requirements must be concretely defined and the selection of design solutions is not black and white. This paper describes a two semester, multi-disciplinary senior capstone project for students from three Engineering and Technology Department programs (electrical engineering, electrical and computer engineering technology, and engineering technology that brings together the tools of project management and the creative product development process into industry sponsored projects.  The projects are fully integrated with the Center for Rapid Product Realization with its dual goals of economic development and enhanced learning.  The stage/gate development process is used with six formal reviews covering the development of the proposal through to the fabrication and testing of the project’s output.  Over the past four years thirty five (35 projects have been undertaken with students getting an exciting

  13. Designing “Theory of Machines and Mechanisms” course on Project Based Learning approach

    DEFF Research Database (Denmark)

    Shinde, Vikas

    2013-01-01

    by the industry and the learning outcomes specified by the National Board of Accreditation (NBA), India; this course is restructured on Project Based Learning approach. A mini project is designed to suit course objectives. An objective of this paper is to discuss the rationale of this course design......Theory of Machines and Mechanisms course is one of the essential courses of Mechanical Engineering undergraduate curriculum practiced at Indian Institute. Previously, this course was taught by traditional instruction based pedagogy. In order to achieve profession specific skills demanded...... and the process followed to design a project which meets diverse objectives....

  14. Design and delivery of the diamond double double bend achromat project

    International Nuclear Information System (INIS)

    Kay, J.; Hammond, N. P.; Thomson, A.

    2016-01-01

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  15. Design and delivery of the diamond double double bend achromat project

    Energy Technology Data Exchange (ETDEWEB)

    Kay, J., E-mail: jim.kay@diamond.ac.uk; Hammond, N. P.; Thomson, A. [Diamond Light Source, Didcot, Oxfordshire, UK, OX11 0DE (United Kingdom)

    2016-07-27

    A major project is underway at Diamond Light Source to remove one of the 24 Double Bend Achromat (DBA) Storage Ring cells and replace it with a Double Double Bend Achromat (DDBA). In this way a new Insertion Device (ID) straight can be created and so ID light can be produced and delivered to a beamline previously only capable of receiving Bending Magnet (BM) radiation. This project is in support of the micro-focus Protein Crystallography (MX) beamline VMX-m which is scheduled to take users towards the end of 2017. This paper describes the Engineering Design of the DDBA project in more detail and gives the current status of the project.

  16. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  17. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  18. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  19. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  20. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2003-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed

  1. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  2. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  3. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  4. A research project to encourage system-compatible design of end-use appliances

    International Nuclear Information System (INIS)

    Dorr, D.; Key, T.; Sitzlar, G.

    1995-01-01

    Cooperative system compatibility research sponsored by the Canadian Electrical Association (CEA) and the Electric Power Research Institute (EPRI) for improving appliance performance deficiencies was described. Power producer and end-user compatibility concerns was addressed through the development of a System Compatibility Research Project. A list of project tasks was provided. The CEA and EPRI initiated a project to establish flicker response of various lighting systems, which included physical tests. Results of this project were presented and discussed. The incentives for developing switch mode power supplies with enhanced immunity to voltage fluctuations and short interruptions was discussed. It was concluded that power quality studies currently underway will provide designers with a profile of the expected utility environment for their products. System compatibility research will identify areas that should be addressed by standards bodies so that designers can apply applicable criteria objectives early in the appliance design process. These efforts were expected to encourage appropriate manufacturer criteria for compatibility by convincing buyers and sellers that there is a real pay back for this investment. 13 refs., 6 figs., 4 tabs

  5. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  6. Conceptual design report, plutonium stabilization and handling,project W-460

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, E.V.

    1997-03-06

    Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

  7. Development and Evaluation of an Undergraduate Multidisciplinary Project Activity in Engineering and Design

    Science.gov (United States)

    Smith, David R.; Cole, Joanne

    2012-01-01

    The School of Engineering and Design Multidisciplinary Project (MDP) at Brunel University is a one week long project based activity involving first year undergraduate students from across the School subject areas of Electronic and Computer Engineering, Mechanical Engineering, Civil Engineering and Design. This paper describes the main aims of the…

  8. Teaching, Doing, and Sharing Project Management in a Studio Environment: The Development of an Instructional Design Open-Source Project Management Textbook

    Science.gov (United States)

    Randall, Daniel L.; Johnson, Jacquelyn C.; West, Richard E.; Wiley, David A.

    2013-01-01

    In this article, the authors present an example of a project-based course within a studio environment that taught collaborative innovation skills and produced an open-source project management textbook for the field of instructional design and technology. While innovation plays an important role in our economy, and many have studied how to teach…

  9. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.-J.; Huertas, F.; Ulibarri, A.

    1992-01-01

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  10. SPECIAL REPORT - The KC EMPOWER Project: Designing More Accessible STEM Learning Activities

    Directory of Open Access Journals (Sweden)

    Bob Hirshon

    2016-01-01

    Full Text Available The overall purpose of the Kinetic City (KC Empower project was to examine how informal science activities can be made accessible for students with disabilities. The premise of this project was that all students, including those with disabilities, are interested in and capable of engaging in science learning experiences, if these experiences are accessible to them. Drawing on resources from Kinetic City, a large collection of science experiments, games, and projects developed by the American Association for the Advancement of Science (AAAS, the project researched and adapted five afterschool science activities guided by universal design for learning principles.

  11. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  12. User-inspired design methodology using Affordance Structure Matrix (ASM for construction projects

    Directory of Open Access Journals (Sweden)

    Maheswari J. Uma

    2017-01-01

    Full Text Available Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost among others. The existing design theories and practice are primarily based on functional requirements. Function-based design deals with design of artifact alone, which may yield favourable or unfavourable consequences with the design artifact. However, incorporating other interactions such as interactions between user & designer is necessary for optimised end-result. Hence, the objective of this research work is to devise a systematic design methodology considering all the three interactions among users, designers and artefacts for improved design efficiency. In this study, it has been attempted to apply the theory of affordances in a case project that involves the design of an offshore facility. A step-by-step methodology for developing Affordance Structure Matrix (ASM, which integrates House of Quality (HOQ and Design Structure Matrix (DSM, is proposed that can effectively capture the user requirements. HOQ is a popular quality management tool for capturing client requirements and DSM is a matrix-based tool that can capture the interdependency among the design entities. The proposed methodology utilises the strengths of both the tools, as DSM compliments HOQ in the process. In this methodology, different affordances such as AUA (Artifact-User-Affordance, AAA (Artifact-Artifact-Affordance and DDA (Designer-Designer-Affordance are captured systematically. Affordance is considered to be user-driven in this context that is in contrast to prevailing design

  13. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  14. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  15. Project margins of advanced reactor design WWER-500

    International Nuclear Information System (INIS)

    Rogov, M.F.; Birukov, G.I.; Ershov, V.G.; Volkov, B.E.

    1994-01-01

    Project criteria for design of advanced WWER-500 reactor within design conditions are compared to the requirements of the Russian regulatory guides. Normal operation limits, safe operation limits for main anticipated operational occurrences and design limits accepted for design basis accidents are considered as in preliminary safety report. It is shown that the basic design criteria in the design of WWER-500 for the anticipated operational occurrences and for design basis accidents are more severe than required in the following regulatory guides General Safety Regulations for Nuclear Power Plants and Nuclear Safety Rules for Reactors of Nuclear Power Plants. This provides certain margins from safety point of view

  16. Sensing and collecting radioactive materials as a project to teach engineering design

    International Nuclear Information System (INIS)

    Drake, D.; Majdi, T.; Strack, J.

    2015-01-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  17. Sensing and collecting radioactive materials as a project to teach engineering design

    Energy Technology Data Exchange (ETDEWEB)

    Drake, D.; Majdi, T.; Strack, J., E-mail: draked2@mcmaster.ca [McMaster University, Hamiltion, ON (Canada); and others

    2015-07-01

    The remote detection and isolation of radioactive materials is both a challenging engineering design project and a relevant issue given modern nuclear circumstances. This project is used in the undergraduate capstone class of the Engineering Physics Department at McMaster University to teach students engineering design. This paper discusses the course outline and learning outcomes of the students who took the course over the 2014-2015 academic year. (author)

  18. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    PICKETT, W.W.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure

  19. DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2003-02-12

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

  20. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    PICKETT, W.W.

    2000-09-22

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. Because this sub-project is still in the construction/start-up phase, all verification activities have not yet been performed (e.g., canister cover cap and welding fixture system verification, MCO Internal Gas Sampling equipment verification, and As-built verification.). The verification activities identified in this report that still are to be performed will be added to the start-up punchlist and tracked to closure.

  1. Colour and inclusivity: a visual communication design project with older people.

    Science.gov (United States)

    da Silva, Fernando Moreira

    2012-01-01

    In an ideal world, inclusive products and services would be the standard and not the exception. This paper presents a systematic approach to an overlap between Visual Communication Design, Printed Colour and Inclusive Design, for older people, with the aim to develop of a set of research-based ageing and ergonomics-centred communication design guidelines and recommendations for printed material (analogical displays). The approach included an initial extensive literature review in the area of colour, older people and ergonomics issues and vision common diseases, communication design. The second phase was the implementation of an experiment to measure the different colour experiences of the participants in two sample groups (one in UK and another one in Portugal), using printed material, to find out the colours one should use in analogical communication material, being aware of the colour contrast importance (foreground versus background) and the difficulties experienced by older people to read and understand lettering, signs. As main contribution of this research project, we developed a set of guidelines and recommendations based on the reviewed literature and the sample groups' findings, trying to demonstrate the importance of these guidelines when conceiving a new communicational design project in a way this project will achieve vision comfort and understandability, especially for older people, in an inclusive design perspective.

  2. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  3. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  4. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  5. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  6. Design Project on Controlled-Release Drug Delivery Devices: Implementation, Management, and Learning Experiences

    Science.gov (United States)

    Xu, Qingxing; Liang, Youyun; Tong, Yen Wah; Wang, Chi-Hwa

    2010-01-01

    A design project that focuses on the subject of controlled-release drug delivery devices is presented for use in an undergraduate course on mass transfer. The purpose of the project is to introduce students to the various technologies used in the fabrication of drug delivery systems and provide a practical design exercise for understanding the…

  7. USL/DBMS NASA/PC R and D project system design standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.

  8. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  9. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  10. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  11. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  12. Delft Aerospace Design Projects 2015 : Challenging New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2015-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2014 and the Spring Design Synthesis Exercise of 2015, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  13. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  14. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  15. Using design science in educational technology research projects

    Directory of Open Access Journals (Sweden)

    Susan M. Chard

    2017-12-01

    Full Text Available Design science is a research paradigm where the development and evaluation of a technology artefact is a key contribution. Design science is used in many domains and this paper draws on those domains to formulate a generic structure for design science research suitable for educational technology research projects. The paper includes guidelines for writing proposals using the design science research methodology for educational technology research and presents a generic research report structure. The paper presents ethical issues to consider in design science research being conducted in educational settings and contributes guidelines for assessment when the research contribution involves the creation of a technology artefact.

  16. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  17. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  18. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  19. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  20. MakerBot projects blueprints

    CERN Document Server

    Larson, Joseph

    2013-01-01

    MakerBot Projects Blueprints is a project-based book, with each chapter taking you through the creation of an awesome stand-alone project. MakerBot Project Blueprints is for anyone with an interest in the 3D printing revolution and the slightest bit of computer skills. Whether you own a 3D printer or not you can design for them. All it takes is Blender, a free 3D modeling tool, this book and a little creativity and someday you'll be able to hold something you designed in the computer in your hands.

  1. Solar Collector Design Optimization: A Hands-on Project Case Study

    Science.gov (United States)

    Birnie, Dunbar P., III; Kaz, David M.; Berman, Elena A.

    2012-01-01

    A solar power collector optimization design project has been developed for use in undergraduate classrooms and/or laboratories. The design optimization depends on understanding the current-voltage characteristics of the starting photovoltaic cells as well as how the cell's electrical response changes with increased light illumination. Students…

  2. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  3. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  4. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  5. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    Science.gov (United States)

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  6. Mechanistic-Empirical (M-E) Design Implementation & Monitoring for Flexible Pavements : 2018 PROJECT SUMMARY

    Science.gov (United States)

    2018-06-01

    This document is a summary of the tasks performed for Project ICT-R27-149-1. Mechanistic-empirical (M-E)based flexible pavement design concepts and procedures were previously developed in Illinois Cooperative Highway Research Program projects IHR-...

  7. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  8. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  9. Sustainable Smart Grid Project Design

    International Nuclear Information System (INIS)

    Szabo, I.

    2014-01-01

    Living together with the SG project generation issues in the last years a significant conclusion revealed from the unknown universe. Technology is not the missing condition for a real-time working country-wide SG power system realization. Technologies are developed, and 'SG-ready'. Engineering society is waiting for the signal to jump till the Moon or even farther. There are technical discussions about SG technologies. All there are marginal (ie. network safety issues, metering issues, electromobility etc.) and projects are mostly targeting the industrial players which obviously want to sell their utmost technologies taking generally not into consideration the overall social interests. The most anticipated question is: Who owns the social responsibility of the future (and as a part of it) its contemporary electric power utility system's responsibility? What should happen in order to start real development of 21st century's power system? How to open eyes of decision makers and energy institutions? Are these auxiliary SG projects natural evolution of the final solutions and systems? (author).

  10. Project design of an open pit colliery in Terkidag, Turkey

    Directory of Open Access Journals (Sweden)

    H. Kose

    2010-10-01

    Full Text Available In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to relyon domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature workconcerning open pit design and production planning is explained in detail. On this basis, the project design and production planningof Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that willbe utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regardingthe project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.

  11. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  12. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  13. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    Science.gov (United States)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  14. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2001-05-15

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3

  15. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    Energy Technology Data Exchange (ETDEWEB)

    BAZINET, G.D.

    2000-11-03

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those

  16. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2001-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted in section 3.1.5 and will be

  17. Design Verification Report Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    BAZINET, G.D.

    2000-01-01

    The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB),'' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. The purpose of this revision is to document completion of verification actions that were pending at the time the initial report was prepared. Verification activities for the installed and operational SSCs have been completed. Verification of future additions to the CSB related to the canister cover cap and welding fixture system and MCO Internal Gas Sampling equipment will be completed as appropriate for those components. The open items related to verification of those requirements are noted

  18. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  19. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  20. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  1. Design requirements document for project W-520, immobilized low-activity waste disposal

    International Nuclear Information System (INIS)

    Ashworth, S.C.

    1998-01-01

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity

  2. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  3. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  4. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  5. Cultivation of students' engineering designing ability based on optoelectronic system course project

    Science.gov (United States)

    Cao, Danhua; Wu, Yubin; Li, Jingping

    2017-08-01

    We carry out teaching based on optoelectronic related course group, aiming at junior students majored in Optoelectronic Information Science and Engineering. " Optoelectronic System Course Project " is product-designing-oriented and lasts for a whole semester. It provides a chance for students to experience the whole process of product designing, and improve their abilities to search literature, proof schemes, design and implement their schemes. In teaching process, each project topic is carefully selected and repeatedly refined to guarantee the projects with the knowledge integrity, engineering meanings and enjoyment. Moreover, we set up a top team with professional and experienced teachers, and build up learning community. Meanwhile, the communication between students and teachers as well as the interaction among students are taken seriously in order to improve their team-work ability and communicational skills. Therefore, students are not only able to have a chance to review the knowledge hierarchy of optics, electronics, and computer sciences, but also are able to improve their engineering mindset and innovation consciousness.

  6. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  7. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    Science.gov (United States)

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  8. The Design of Project Management Structural Organization

    OpenAIRE

    Dumitru Constantinescu; Cristian Etegan

    2007-01-01

    The relationships organization-suppliers-customers have recently known major changes in the structure of services and have made the organization develop its managerial and professional competencies in order to do projects. The qualified organization is the most trust-worthy in the process of doing a project. The participation of an organization in doing projects depends on a multitude of factors. Out of these factors, the structural organization comes forth, as it represents the variable with...

  9. High-gain capsule design for the HIDIF project

    International Nuclear Information System (INIS)

    Honrubia, J.J.; Cerrada, J.A.; Gomez, R.

    2000-01-01

    A high-gain capsule has been designed for the HIDIF project. The goal has been to relax the accelerator requirements by using a radiation pulse with lower peak temperature (220 eV) than previous designs (260 eV). The ablator material is beryllium doped with a very low concentration (0.2 atom %) of copper. The capsule absorbs 1.3 MJ and yields, approximately, 450 MJ in I-D simulations. The effect of the opacity of the ablator on capsule performance has been studied in detail. (authors)

  10. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    International Nuclear Information System (INIS)

    Piros, Attila; Veres, Gábor

    2013-01-01

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution

  11. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Piros, Attila, E-mail: attila.piros@gt3.bme.hu [Department of Machine and Product Design, Budapest University of Technology and Economics, Budapest (Hungary); Veres, Gábor [Department of Plasma Physics, Wigner Research Centre for Physics, Hungarian Academy of Sciences, Budapest (Hungary)

    2013-10-15

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution.

  12. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  13. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  14. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  15. Implementation of Effective Capstone Projects in Undergraduate Manufacturing Design Engineering Program

    Science.gov (United States)

    Viswanathan, Shekar

    2017-01-01

    Final program projects (capstone course) in manufacturing design engineering technology at National University are intensive experiences in critical thinking and analysis, designed to broaden students' perspectives and provide an opportunity for integration of coursework in the area of manufacturing design engineering. This paper focuses on three…

  16. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...

  17. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  18. Interactive Room Support for Complex and Distributed Design Projects

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Gundersen, Kristian Kroyer; Mogensen, Preben Holst

    2001-01-01

    We are investigating the design of digital 3D interaction technology embedded in a physical environment. We take as point of departure cemplex, collaborative industrial design projects involving heterogeneous sets of documents, and physical as well as digital 3D models. The paper introduces our...... interaction devices being experimented with in the interactive room environment. The interactive room technologies have all been designed with the requirement that they must seamlessly integrate both into the physical and into the digital work environment while providing new affordances for industrial design...

  19. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  20. Redeveloping Nicosia International Airport: an extroverting Y2 group design project

    Science.gov (United States)

    Yiatros, S.

    2017-11-01

    This article follows the timeline of the 'Nicosia International Airport: The Return' Integrated Design Project which was undertaken by Year 2 students of Civil Engineering and Geomatics at the Cyprus University of Technology in Cyprus. The Nicosia International Airport was the first and main airport of the Republic of Cyprus since its independence from the British Empire in 1960. The airport remains closed since the Turkish invasion of 1974 and is located in the buffer zone administered by the United Nations Peace-keeping Force in Cyprus. In this work, the innovative aspects of a project to inspire and train engineering students are highlighted, while special attention is given to the dissemination and outreach of the project through the social media. The attracted attention of national media and the project's impact on the local society had a cyclical effect, further inspiring students to work hard and act as responsible professional engineers. 'Nicosia International Airport: The Return' is a case study of how an academic engineering project can have societal impact, by inspiring students, engaging practitioners from a wide spectrum of disciplines, captivating the general public and raising the profile of Civil Engineering in the society.

  1. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  2. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  3. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  4. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  5. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  6. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  7. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  8. Advanced engineering environment collaboration project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-12-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

  9. Advanced engineering environment collaboration project

    International Nuclear Information System (INIS)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-01-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications

  10. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  11. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  12. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  13. Humane Education Projects Handbook.

    Science.gov (United States)

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  14. Rapid E-learning Development Strategies and a Multimedia Project Design Model

    Science.gov (United States)

    Sözcü, Ömer Faruk; Ipek, Ismail

    2014-01-01

    The purpose of the study is to discuss e-learning design strategies which can be used for multimedia projects as a design model. Recent advances in instructional technologies have been found to be very important in the design of training courses by using rapid instructional design (ID) approaches. The approaches were developed to use in training…

  15. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities

  16. Sampling design for use by the soil decontamination project

    International Nuclear Information System (INIS)

    Rutherford, D.W.; Stevens, J.R.

    1981-01-01

    This report proposes a general approach to the problem and discusses sampling of soil to map the contaminated area and to provide samples for characterizaton of soil components and contamination. Basic concepts in sample design are reviewed with reference to environmental transuranic studies. Common designs are reviewed and evaluated for use with specific objectives that might be required by the soil decontamination project. Examples of a hierarchial design pilot study and a combined hierarchial and grid study are proposed for the Rocky Flats 903 pad area

  17. The experimental design of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Steven L. Sheriff; Shuoqiong. He

    1997-01-01

    The Missouri Ozark Forest Ecosystem Project (MOFEP) is an experiment that examines the effects of three forest management practices on the forest community. MOFEP is designed as a randomized complete block design using nine sites divided into three blocks. Treatments of uneven-aged, even-aged, and no-harvest management were randomly assigned to sites within each block...

  18. Design and testing of a perimeter of increment threshold by projection

    OpenAIRE

    García Domene, María del Carmen; Luque Cobija, María José; Fez Saiz, Dolores de

    2017-01-01

    In the present study, we have designed and tested a perimeter for the detection of damage in the chromatic mechanisms using a video projector. To this purpose, we have characterized pixel to pixel a video projector, to account for the inhomogeneities in the projection. We have measured the tristimulus values of the projector primaries as a function of digital level, at 49 locations of the projection screen and, from them, we have arrived to a characterization model which reduces the color dif...

  19. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  20. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    Science.gov (United States)

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  1. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... of this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  2. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  3. Experimental and theoretical analysis for improved microscope design of optical projection tomographic microscopy.

    Science.gov (United States)

    Coe, Ryan L; Seibel, Eric J

    2013-09-01

    We present theoretical and experimental results of axial displacement of objects relative to a fixed condenser focal plane (FP) in optical projection tomographic microscopy (OPTM). OPTM produces three-dimensional, reconstructed images of single cells from two-dimensional projections. The cell rotates in a microcapillary to acquire projections from different perspectives where the objective FP is scanned through the cell while the condenser FP remains fixed at the center of the microcapillary. This work uses a combination of experimental and theoretical methods to improve the OPTM instrument design.

  4. Research and Development Projects with ICT and students as learning designers in Primary Schools

    DEFF Research Database (Denmark)

    Levinsen, Karin; Sørensen, Birgitte Holm; Tosca, Susana

    2014-01-01

    In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... to the need to strengthen the populations’ digital literacy and 21st century competencies. The call’s scope was research and development projects as pilot school experiments in relation to five selected areas. The selected projects should contribute with new generalizable and practice oriented knowledge...... of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices...

  5. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  6. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  7. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  8. Balancing research and organizational capacity building in front-end project design

    DEFF Research Database (Denmark)

    Hjortsø, Carsten Nico Portefée; Meilby, Henrik

    2013-01-01

    is more complex. We identify 11 specific factors influencing front-end project management related to structure, process and relationship, and we theorize about how these factors influence the choice between research and more general capacity development activities. Copyright © 2013 John Wiley & Sons, Ltd......, but in order for partnerships to comply with general governance-level recommendations, a better understanding is needed of how specific context-dependent factors influence the development and execution of projects. In this article, we aim to contribute to the understanding of factors influencing the design...... phase of RCB partnerships and examine how they influence the balance between performing collaborative research and developing general organizational capacity. Data collection was based on a survey (n = 25), and individual interviews and focus group discussions with 17 Danish project managers from...

  9. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  10. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kimiya, Y.; Kihara, M.; Yamane, I.

    1991-01-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  11. Design of the compressor/stretcher ring of the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Ohmori, C.; Noda, A.; Kamiya, Y.; Kihara, M.; Yamane, I.

    1991-02-01

    A possibility of adopting a racetrack-type design for the compressor/stretcher ring of the Japanese Hadron Project is described. This design has two long straight sections to enable to inject the H - beam and to produce a high β point for the slow extraction. (author)

  12. Spent nuclear fuel project design basis capacity study

    Energy Technology Data Exchange (ETDEWEB)

    Cleveland, K.J.

    1996-09-09

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  13. The TULIP Project.

    Science.gov (United States)

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  14. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  15. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  16. A Nordic Project Project on High Speed Low Power Design in Sub-micron CMOS Technology for Mobile

    DEFF Research Database (Denmark)

    Olesen, Ole

    1997-01-01

    circuit design is based on state-of-the-art CMOS technology (0.5µm and below) including circuits operating at 2GHz. CMOS technology is chosen, since a CMOS implementation is likely to be significantly cheaper than a bipolar or a BiCMOS solution, and it offers the possibility to integrate the predominantly...... of including good off-chip components in the design by use of innovative, inexpensive package technology.To achieve a higher level of integration, the project will use a novel codesign approach to the design strategy. Rather than making specifications based on a purely architectural approach, the work uses...

  17. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    2016-01-01

    Internationally, new pedagogical approaches emphasizing collaboration or learning in networks have been developed following the introduction of new technologies, especially the spread of social media. It is interesting to see such pedagogical developments in relation to similar approaches......, developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...... digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...

  18. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  19. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  20. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  1. The Impact of Group Design Projects in Engineering on Achievement Goal Orientations and Academic Outcomes

    Science.gov (United States)

    Rambo-Hernandez, Karen E.; Atadero, Rebecca A.; Balgopal, Meena

    2017-01-01

    This study examined the impact of incorporating group design projects into a second-year engineering class on achievement goal orientations and two academic outcomes: concept inventory and final exam scores. In this study, two sections were taught using lecture format, but one section also completed three group design projects as part of their…

  2. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  3. Exploring an innovation project as source of change in organization design

    DEFF Research Database (Denmark)

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we...

  4. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  5. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  6. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  7. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  8. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  9. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  10. [Theories and methodologies of engineering designs on sustainable agricultural land consolidation project--a case study of Xuemeiyang land consolidation project in Changtai County, Fujian Province].

    Science.gov (United States)

    Ye, Yanmei; Wu, Cifang; Cheng, Chengbiao; Qiu, Lingzhang; Huang, Shengyu; Zheng, Ruihui

    2002-09-01

    The concept and characteristics of engineering designs on sustainable agricultural land consolidation project were discussed in this paper. Principles, basic methods and procedures of engineering designs on agricultural land consolidation project were put forward, which were successfully adopted for designing agricultural land consolidation in Xuemeiyang region of Changtai County, including diversity designs of sustainable land use, engineering designs of soil improvement, roads, ditches, and drains for protecting existent animal environments, and design of ecological shelter-forests in farmland. Moreover, from sustainable economic, ecological and social points, the results of these engineering designs were evaluated based on fouteen important indexes. After carrying out these engineeringdesigns, the eco-environments and agricultural production conditions were significantly improved, and the farm income was increased in planned regions.

  11. SEU blending project, concept to commercial operation, Part 4: engineering design

    International Nuclear Information System (INIS)

    Ingalls, D.G.; Ioffe, M.S.; Oliver, A.J.; Smith, T.P.; Ozberk, E.

    2005-01-01

    The process development test program for production of Slightly Enriched Uranium (SEU) dioxide powder and Blend of Dysprosium and Uranium (BDU) oxide powder was initiated almost simultaneously with the conceptual engineering study for the commercial plant in 2001. During the very early phases of the project it was recognized that meeting the challenging requirements would necessitate wide expertise from different departments within the Cameco operations as well as consultants from outside the Company. The project team formed reflected this recognition. The conceptual engineering study was the lead into preparation of the engineering design study in 2003, which provided the process description based on the research and development program being carried out at Cameco Technology Development (CTD), project description, and project cost estimates. The detailed engineering phase commenced in June 2004 and was in progress at the the time when this paper was presented. The detailed engineering phase is addressing all aspects of the commercial plant including all health and safety, environment and security related issues, nuclear safety, training program, all product quality assurance issues, quality management issues, powder and fuel bundle transportation issues, all regulatory requirements, establishing project execution plans and budget, and strategies to control the costs. At the end of the detailed engineering phase, construction packages will be ready for tender, and major pieces of equipment will be selected and procured. (author)

  12. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  13. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  14. 24 CFR 266.200 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... being collected at unassisted projects in the market area that are similar in amenities and location to... assistance agreement or the unit rents being collected at unassisted projects in the market that are similar... in § 266.5. (g) Elderly projects. Projects or parts of projects specifically designed for the use and...

  15. The Mississippi CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  16. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  17. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  18. The research and development of module 3D designing system for nuclear power project based on the PDMS

    International Nuclear Information System (INIS)

    Lu Qinwu; Li Yi; Wu Xiangyong

    2012-01-01

    In order to meet the demand of implementing Modularization design in CPR1000 nuclear power projects, this study aims to develop, relying on CPR1000 nuclear power project, the self-reliant module 3D design system based on the PDMS. so as to offer a convenient and effective module 3D design tool for the designers. Satisfactory results have been achieved through the test and application of two design projects. The research and application have entered the domestic advanced level. (authors)

  19. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them.

  20. Spent nuclear fuel project design basis capacity study

    International Nuclear Information System (INIS)

    Cleveland, K.J.

    1998-01-01

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration

  1. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  2. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  3. Project beneficiary participation and behavioural intentions promoting project sustainability: : The mediating role of psychological ownership

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, B.

    It is of great importance that development projects (especially those projects that target improving the livelihood of rural communities) continue to deliver their intended benefits over their intended economic life – we call this ‘project sustainability’. Applying an experimental design, our study

  4. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  5. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  6. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  7. Alternative Evaluation Designs for Data-Centered Technology-Based Geoscience Education Projects

    Science.gov (United States)

    Zalles, D. R.

    2012-12-01

    This paper will present different strategies for how to evaluate contrasting K-12 geoscience classroom-based interventions with different goals, leveraging the first author's experiences as principal investigator of four NSF and NASA-funded geoscience education projects. Results will also be reported. Each project had its own distinctive features but all had in common the broad goal of bringing to high school classrooms uses of real place-based geospatial data to study the relationships of Earth system phenomena to climate change and sustainability. The first project's goal was to produce templates and exemplars for curriculum and assessment designs around studying contrasting geoscience topics with different data sets and forms of data representation. The project produced a near transfer performance assessment task in which students who studied climate trends in Phoenix turned their attention to climate in Chicago. The evaluation looked at the technical quality of the assessment instrument as measured by inter-rater reliability. It then analyzed the assessment results against student responses to the instructional tasks about Phoenix. The evaluation proved useful in pinpointing areas of student strength and weakness on different inquiry tasks, from simple map interpretation to analysis of contrasting claims about what the data indicate. The goal of the second project was to produce an exemplar curriculum unit that bridges Western science and traditional American Indian ecological knowledge for student learning and skill building about local environmental sustainability issues. The evaluation looked at the extent to which Western and traditional perspectives were incorporated into the design of the curriculum. The curriculum was not constructed with a separate assessment, yet evidence centered design was utilized to extrapolate from the exemplar unit templates for future instructional and assessment tasks around other places, other sustainability problems, and

  8. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  9. Advanced conceptual design report solid waste retrieval facility, phase I, project W-113

    International Nuclear Information System (INIS)

    Smith, K.E.

    1994-01-01

    Project W-113 will provide the equipment and facilities necessary to retrieve suspect transuranic (TRU) waste from Trench 04 of the 218W-4C burial ground. As part of the retrieval process, waste drums will be assayed, overpacked, vented, head-gas sampled, and x-rayed prior to shipment to the Phase V storage facility in preparation for receipt at the Waste Receiving and Processing Facility (WRAP). Advanced Conceptual Design (ACD) studies focused on project items warranting further definition prior to Title I design and areas where the potential for cost savings existed. This ACD Report documents the studies performed during FY93 to optimize the equipment and facilities provided in relation to other SWOC facilities and to provide additional design information for Definitive Design

  10. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  11. The Genome of the Netherlands: design, and project goals

    Science.gov (United States)

    Boomsma, Dorret I; Wijmenga, Cisca; Slagboom, Eline P; Swertz, Morris A; Karssen, Lennart C; Abdellaoui, Abdel; Ye, Kai; Guryev, Victor; Vermaat, Martijn; van Dijk, Freerk; Francioli, Laurent C; Hottenga, Jouke Jan; Laros, Jeroen F J; Li, Qibin; Li, Yingrui; Cao, Hongzhi; Chen, Ruoyan; Du, Yuanping; Li, Ning; Cao, Sujie; van Setten, Jessica; Menelaou, Androniki; Pulit, Sara L; Hehir-Kwa, Jayne Y; Beekman, Marian; Elbers, Clara C; Byelas, Heorhiy; de Craen, Anton J M; Deelen, Patrick; Dijkstra, Martijn; den Dunnen, Johan T; de Knijff, Peter; Houwing-Duistermaat, Jeanine; Koval, Vyacheslav; Estrada, Karol; Hofman, Albert; Kanterakis, Alexandros; Enckevort, David van; Mai, Hailiang; Kattenberg, Mathijs; van Leeuwen, Elisabeth M; Neerincx, Pieter B T; Oostra, Ben; Rivadeneira, Fernanodo; Suchiman, Eka H D; Uitterlinden, Andre G; Willemsen, Gonneke; Wolffenbuttel, Bruce H; Wang, Jun; de Bakker, Paul I W; van Ommen, Gert-Jan; van Duijn, Cornelia M

    2014-01-01

    Within the Netherlands a national network of biobanks has been established (Biobanking and Biomolecular Research Infrastructure-Netherlands (BBMRI-NL)) as a national node of the European BBMRI. One of the aims of BBMRI-NL is to enrich biobanks with different types of molecular and phenotype data. Here, we describe the Genome of the Netherlands (GoNL), one of the projects within BBMRI-NL. GoNL is a whole-genome-sequencing project in a representative sample consisting of 250 trio-families from all provinces in the Netherlands, which aims to characterize DNA sequence variation in the Dutch population. The parent–offspring trios include adult individuals ranging in age from 19 to 87 years (mean=53 years; SD=16 years) from birth cohorts 1910–1994. Sequencing was done on blood-derived DNA from uncultured cells and accomplished coverage was 14–15x. The family-based design represents a unique resource to assess the frequency of regional variants, accurately reconstruct haplotypes by family-based phasing, characterize short indels and complex structural variants, and establish the rate of de novo mutational events. GoNL will also serve as a reference panel for imputation in the available genome-wide association studies in Dutch and other cohorts to refine association signals and uncover population-specific variants. GoNL will create a catalog of human genetic variation in this sample that is uniquely characterized with respect to micro-geographic location and a wide range of phenotypes. The resource will be made available to the research and medical community to guide the interpretation of sequencing projects. The present paper summarizes the global characteristics of the project. PMID:23714750

  12. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  13. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  14. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  15. Status of the mechanical design of the 650 MHz cavities for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Barbanotti, S.; Grimm, C.; Champion, M.; Foley, M.; Ginsburg, C.M.; Gonin, I.; Peterson, T.; Ristori, L.; Yakovlev, V.; /Fermilab

    2011-03-01

    In the high-energy section of the Project X Linac, acceleration of H{sup -} ions takes place in superconducting cavities operating at 650 MHz. Two families of five-cell elliptical cavities are planned: beta = 0.61 and beta = 0.9. A specific feature of the Project X Linac is low beam loading, and thus, low bandwidth and higher sensitivity to microphonics. Efforts to optimize the mechanical design of the cavities to improve their mechanical stability in response to the helium bath pressure fluctuations will be presented. These efforts take into account constraints such as cost and ease of fabrication. Also discussed will be the overall design status of the cavities and their helium jackets. The proposed design of the 3 GeV Project X superconducting (SC) Linac employs 650 MHz five-cell elliptical cavities to accelerate 1.0 mA of average H-beam current in the 160-3000 MeV energy range. The 650 MHz region of the Linac is divided into two sections with two different geometric phase velocity factors: beta = 0.61 to cover the 160-520 MeV range and beta = 0.9 to cover the 520-3000 MeV range. Approximately 40 beta = 0.61 and 150 beta = 0.9 cavities are currently planned for the project. An R&D program is in progress at FNAL, in collaboration with TJNAF and India, to develop the 650 MHz cavities for the proposed Linac design. This R&D program includes the design and fabrication of several beta = 0.61 and beta = 0.9 single-cell prototypes for evaluation prior to production of the five-cell cavities. FNAL has contracted AES to fabricate the beta = 0.9 prototypes, while TJNAF is building beta = 0.61 prototypes of their own design. In the remainder of this paper we will restrict our discussion to the five-cell beta = 0.9 cavities.

  16. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  17. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    Science.gov (United States)

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  18. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  19. The Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-06-30

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

  20. Cam Design Projects in an Advanced CAD Course for Mechanical Engineers

    Science.gov (United States)

    Ault, H. K.

    2009-01-01

    The objective of this paper is to present applications of solid modeling aimed at modeling of complex geometries such as splines and blended surfaces in advanced CAD courses. These projects, in CAD-based Mechanical Engineering courses, are focused on the use of the CAD system to solve design problems for applications in machine design, namely the…

  1. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  2. Reflexive project management in high-ambition projects : Exploring the competencies for managing innovative sustainable designs

    NARCIS (Netherlands)

    Loeber, A.; Vermeulen, T.

    2016-01-01

    Purpose The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  3. Re-designing project management : Steps towards a project management curriculum for a sustainable built environment

    NARCIS (Netherlands)

    Heintz, J.L.; Lousberg, L.H.M.J.; Prins, M.

    2015-01-01

    Sustainability concerns add a wide range of both stakeholders and performance expectations to building projects. The transition of a circular economy will also have a significant impact on the way in which building projects are carried out. This in addition to an already established escalation of

  4. Managing nuclear projects: a design agency experience in the design-build of waste management facilities in Canada

    International Nuclear Information System (INIS)

    Brewer, R.; Calzolari, L.

    2006-01-01

    Quality Assurance guarantees the quality of a product; it does not guarantee that it is a quality product. As procedures develop to satisfy QA programs and regulatory needs it is necessary to find ways to ensure that procedural management reinforces project management and does not detract from it. CANATOM NPM's experience in bidding for and executing the design or design and construction of nuclear waste management facilities demonstrates how design excellence and innovation can still be achieved while successfully managing the challenge of technical administration. The sourcing of expertise, the intricacies of design definition and the coordinating efforts required in the execution of the projects (one fully completed, the other into its engineering phase) will provide a valuable insight into the role and activities of an engineering company engaged in a 'Design Agency' (DA) role. (author)

  5. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  6. Visuals Matter! Designing and using effective visual representations to support project and portfolio decisions

    DEFF Research Database (Denmark)

    Geraldi, Joana; Arlt, Mario

    . They can help managers to be sharper and quicker, especially if visuals are used in a mindful manner. The intent of this book is to increase the awareness of project, program and portfolio practitioners and scholars about the importance of visuals and to provide practical recommendations on how they can......This book is the result of a two-year research project, funded by Project Management Institute and University College London on data visualization in the project and portfolio management contexts. Visuals are powerful and constitute an integral part of analyzing problems and making decisions...... be used and designed mindfully. The research, which underpins this book, focuses on the impact of visuals on cognition of data in project portfolio decisions. The complexity of portfolio problems often exceed human cognitive limitations as a result of a number of factors, such as the large number...

  7. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  8. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  9. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    over which developers and financiers will be most focused over the development process. The concept of a power station for which the fuel is entirely free is attractive. However, this advantage is balanced by the variability of the wind which, to the uninitiated, may make an investment in such a scheme appear highly risky. In order to assess the energy production of a wind farm over the project life, it is necessary to determine accurately the long-term mean wind speed at a potential site. The prediction of energy production of a wind farm is dependent on many inputs for which the uncertainties can be objectively defined. This area therefore lends itself to a statistical assessment of the risks associated with a project. The wind analyst will review the uncertainties associated with the assessment and will obtain a 'standard deviation' for the analysis that can be applied to the central estimate. Based upon GH experience, where appropriate wind measurements have been made and diligently analysed and wind turbines with a good track record are used, it is likely that the 10-year 90% exceeding level (P90) for the wind farm production will be of the order of 10% to 15% below the central estimate (P50) of energy production for the wind farm. It is typical for an Operation and Management contract to be let to the turbine supplier for the duration of the defects liability period. Where the initial warranty period is only 2 years in term, the service period may extend to 5 years and cover unscheduled maintenance (repair) as well as routine servicing. Project Life Modern wind turbines are typically designed to be suitable for use within a specific envelope of climatic conditions over a 20 year design life. This lifetime assumption is generally supported by independent certification by a classification society such as Germanischer Lloyd or Det Norske Veritas, which has the primary purpose of ensuring that a design is compliant with specific safety requirements. Despite

  10. Optic issues in ongoing ERL projects

    International Nuclear Information System (INIS)

    Smith, S.L.; Muratori, B.D.; Owen, H.L.; Hoffstaetter, G.H.; Litvinenko, V.N.; Ben-Zvi, I.; Bai, M.; Beebe-Wang, J.; Blaskiewicz, M.; Calaga, R.; Fischer, W.; Chang, X.Y.; Kayran, D.; Kewisch, J.; MacKay, W.W.; Montag, C.; Parker, B.; Ptitsyn, V.; Roser, T.; Ruggiero, A.; Satogata, T.; Surrow, B.; Tepikian, S.; Trbojevic, D.; Yakimenko, V.; Zhang, S.Y.; Piot, Ph.

    2006-01-01

    A wide range of optics issues for energy recovery linac (ERL)-based projects are illustrated through the presentation of ongoing projects covering both light sources, at Cornell and Daresbury and high energy and nuclear physics accelerators at the Brookhaven National Laboratory. This presented range of projects demonstrates how the different designs teams see the challenges of studying and solving optics issues for their particular project's ERLs, with studies appropriate to the stage of maturity of the project. Finally, as an illustration of the complexity and detail behind a single aspect of ERL optics design we present an overview of the highly important generic topic of longitudinal phase space evolution in ERLs

  11. 23 CFR 660.112 - Project development.

    Science.gov (United States)

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  12. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  13. A Project-Based Learning Approach to Programmable Logic Design and Computer Architecture

    Science.gov (United States)

    Kellett, C. M.

    2012-01-01

    This paper describes a course in programmable logic design and computer architecture as it is taught at the University of Newcastle, Australia. The course is designed around a major design project and has two supplemental assessment tasks that are also described. The context of the Computer Engineering degree program within which the course is…

  14. Delivery improvements for CANDU projects

    International Nuclear Information System (INIS)

    Stephen Yu; Ken Hedges

    1998-01-01

    Future CANDU design will continue to meet emerging design and performance requirements as expected by the operating utilities, and will integrate new technologies into both the product features and work processes. Elements of this risk reduction strategy include feedback of lessons learned from operating plants, project experiences from previous projects, and replication of successful systems and equipment. Project implementation risk is minimized by up-front engineering and licensing prior to contract start. Enhanced competitiveness of the CANDU products is ensured by incorporating improvements based on updated technology. This paper summarizes the strategy used to enhance competitiveness of the CANDU products and the measures introduced to minimize risk during project implementation. This strategy provides a balance between innovation and proven designs; and between the desire for safety and operational improvements and the cost to achieve the improvements

  15. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  16. Evaluation of different Project Based Learning designs in an MSc degree

    Directory of Open Access Journals (Sweden)

    Carmen García Berdonés

    2014-03-01

    Full Text Available The design and implementation of different Project Based Learning (PBL approaches are presented in this paper. All of them were carried out in the framework of the MSc degree in Electronic Systems for Smart Environments from the University of Malaga. Four subjects were developed using different values of the three main parameters of PBL: teamwork, self-guided learning and project complexity. During two academic years, several indicators were used to evaluate these experiences: compliance with subject time schedules, scores obtained for the students, interaction of each student in his team and satisfaction of students with the experiences. Our results encourage the use of PBL in bachelor degrees but, at the same time, confirm that PBL implementation is not a trivial task when projects are complex or when a high level of autonomous learning is required from students. Teamwork difficulties have also been found. So, we discuss the need of reaching a minimum level of proficiency in some key competencies before using PBL.

  17. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  18. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  19. 40 CFR 93.125 - Enforceability of design concept and scope and project-level mitigation and control measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Enforceability of design concept and... Transit Laws § 93.125 Enforceability of design concept and scope and project-level mitigation and control... determinations for a transportation plan or TIP and are included in the project design concept and scope which is...

  20. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  1. Citizen participation, indispensable factor in the generation of urban design projects that respond to the needs of users in Mexico

    Directory of Open Access Journals (Sweden)

    Flavio Franco Muñoz

    2015-09-01

    Full Text Available The relationship between urban design projects with users, it is evident that the importance of public participation in the development of the realization and implementation of these projects; being one of the aspects that aroused the interest in developing the research project "Citizen Participation and rehabilitation of public spaces in the downtown area of Aguascalientes. The cases of Madero and Venustiano Carranza Zaragoza streets" in the which it aims to propose a model for the process of developing an urban design project that incorporates citizen participation effectively, based on the analysis of cases of Madero and Venustiano Carranza Zaragoza streets and analysis theoretical framework of the research project; This research is being done within the Doctorate of Science of the Anthropic Areas, which is being conducted at the Autonomous University of Aguascalientes. The aim expose in this paper is the importance of public participation in a key stage in the process of realization and implementation of a project of urban design, urban planning stage, to substantiate the development stage of the project design city; this proposal derived from the analysis of the knowledge acquired through the research project being conducted within the PhD. The set in our research project to develop the stages in the process of realization and implementation of an urban design project, made up, urban planning, studies to substantiate the project, zoning scheme, the draft, the project executive, project implementation and monitoring, control and evaluation of urban design project realized; allowed to establish the stages where citizen participation is essential, and these stages, identifying the aspects that will be enriched with the knowledge gained from this participation. Considering the participation of citizens from the realization of urban development programs, whether in cities, partial, sectoral or development schemes localities, allow to be

  2. Project Boomerang

    Science.gov (United States)

    King, Allen L.

    1975-01-01

    Describes an experimental project on boomerangs designed for an undergraduate course in classical mechanics. The students designed and made their own boomerangs, devised their own procedures, and carried out suitable measurements. Presents some of their data and a simple analysis for the two-bladed boomerang. (Author/MLH)

  3. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  4. The ZAP Project: Designing Interactive Computer Tools for Learning Psychology

    Science.gov (United States)

    Hulshof, Casper; Eysink, Tessa; de Jong, Ton

    2006-01-01

    In the ZAP project, a set of interactive computer programs called "ZAPs" was developed. The programs were designed in such a way that first-year students experience psychological phenomena in a vivid and self-explanatory way. Students can either take the role of participant in a psychological experiment, they can experience phenomena themselves,…

  5. Implementation of an Industrial-Based Case Study as the Basis for a Design Project in an Introduction to Mechanical Design Course

    Science.gov (United States)

    Lackey, Ellen

    2011-01-01

    The purpose of this paper is to discuss the implementation of an industrial-based case study as the basis for a design project for the Spring 2009 Introduction to Mechanical Design Course at the University of Mississippi. Course surveys documented the lack of student exposure in classes to the types of projects typically experienced by engineers…

  6. The Design and Development of a Computerized Tool Support for Conducting Senior Projects in Software Engineering Education

    Science.gov (United States)

    Chen, Chung-Yang; Teng, Kao-Chiuan

    2011-01-01

    This paper presents a computerized tool support, the Meetings-Flow Project Collaboration System (MFS), for designing, directing and sustaining the collaborative teamwork required in senior projects in software engineering (SE) education. Among many schools' SE curricula, senior projects serve as a capstone course that provides comprehensive…

  7. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  8. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  9. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  10. The Esmeralda project

    International Nuclear Information System (INIS)

    Sophy, Y.

    1979-01-01

    This paper discusses the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The design objectives and major features of the project are presented. The need for sodium fire testing on such a scale, results from problems of similitude arising from the extrapolation of previous results to fires liable to occur in large fast neutron reactors such as Super-Phenix. (author)

  11. The LHC project

    CERN Multimedia

    CERN. Geneva

    2002-01-01

    At the halfway point in the construction of the LHC, the project is now moving from the design and procurement phase to the installation phase, which officially started on 1st March. An overview of the progress of the project is given and the final schedule for installation and commissioning is discussed. The talk will be given in English but questions can be taken in French.

  12. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  13. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  14. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  15. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report - Project A.5 and A.6

    International Nuclear Information System (INIS)

    ARD, K.E.

    2000-01-01

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01

  16. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  17. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  18. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  19. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  20. Application of Deterministic and Probabilistic System Design Methods and Enhancements of Conceptual Design Tools for ERA Project

    Science.gov (United States)

    Mavris, Dimitri N.; Schutte, Jeff S.

    2016-01-01

    This report documents work done by the Aerospace Systems Design Lab (ASDL) at the Georgia Institute of Technology, Daniel Guggenheim School of Aerospace Engineering for the National Aeronautics and Space Administration, Aeronautics Research Mission Directorate, Integrated System Research Program, Environmentally Responsible Aviation (ERA) Project. This report was prepared under contract NNL12AA12C, "Application of Deterministic and Probabilistic System Design Methods and Enhancement of Conceptual Design Tools for ERA Project". The research within this report addressed the Environmentally Responsible Aviation (ERA) project goal stated in the NRA solicitation "to advance vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions." To identify technology and vehicle solutions that simultaneously meet these three metrics requires the use of system-level analysis with the appropriate level of fidelity to quantify feasibility, benefits and degradations, and associated risk. In order to perform the system level analysis, the Environmental Design Space (EDS) [Kirby 2008, Schutte 2012a] environment developed by ASDL was used to model both conventional and unconventional configurations as well as to assess technologies from the ERA and N+2 timeframe portfolios. A well-established system design approach was used to perform aircraft conceptual design studies, including technology trade studies to identify technology portfolios capable of accomplishing the ERA project goal and to obtain accurate tradeoffs between performance, noise, and emissions. The ERA goal, shown in Figure 1, is to simultaneously achieve the N+2 benefits of a cumulative noise margin of 42 EPNdB relative to stage 4, a 75 percent reduction in LTO NOx emissions relative to CAEP 6 and a 50 percent reduction in fuel burn relative to the 2005 best in class aircraft. There were 5 research task associated with this research: 1) identify technology collectors, 2) model

  1. Design considerations of the World Bank-assisted $55 million photovoltaic market development project in India

    International Nuclear Information System (INIS)

    Cabraal, A.; Bradley, J.

    1993-01-01

    The World Bank's first loan for photovoltaic (PV) power systems was approved on December 17, 1992. The $55-million project will offer concessional financing through the Indian Renewable Energy Development Agency (IREDA) for the purchase of PV systems. The objective of the PV Market Development Project is to encourage the establishment of sustainable product supply, delivery, after-sales service, and financing mechanisms to support marketing PV products on a commercial basis. This paper outlines the issues and steps involved in the project design including: (1) technical viability, (2) financial and economic viability, (3) infrastructure issues, and (4) the economic and financial viability of the project as a whole

  2. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  3. Introduction to the Halden project and a short overview of the MMS activities at the project

    International Nuclear Information System (INIS)

    Owre, F.

    2005-01-01

    This presentation discusses the Man Machine System (MMS) research within the Halden Reactor Project located in Norway. This project is an International collaboration and the mission of this project is to improve safety at operating nuclear plants. The research activities include human reliability, knowledge management, design and evaluation of human system interfaces and control rooms, virtual reality for design, planning and training, operation and maintenance in a competitive electricity market as well as digital system safety research

  4. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    This is the nineteenth annual Report on the OECD Halden Reactor Project, describing activities at the Project during 1978, the last year of the 1976-1978 Halden Agreement. Work continued in two main fields: test fuel irradiation and fuel research, and computer-based process supervision and control. Project research on water reactor fuel focusses on various aspects of fuel behavior under normal, and off-normal transient conditions. In 1978, participating organisations continued to submit test fuel for irradiation in the Halden boiling heavy-water reactor, in instrumented test assemblies designed and manufactured by the Project. Work included analysis of the impact of fuel design and reactor operating conditions on fuel cladding behavior. Fuel performance modelling included characterization of thermal and mechanical behavior at high burn-up, of fuel failure modes, and improvement of data qualification procedures to reduce and quantify error bands on in-reactor measurements. Instrument development yielded new or improved designs for measuring rod temperature, internal pressure, axial neutron flux shape determination, and for detecting cladding defects. Work on computer-based methods of reactor supervision and control included continued development of a system for predictive core surveillance, and of special mathematical methods for core power distribution control

  5. Conservation Science Fair Projects.

    Science.gov (United States)

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  6. Financing landfill gas projects

    International Nuclear Information System (INIS)

    Bull, R.

    1992-01-01

    The problems of financing landfill gas projects in the UK in the last few years are discussed. The approach of the author in setting up a company to finance such projects in the power generation field and a separate company to design and supply turnkey packages is reported. (UK)

  7. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  9. Nuclear design aspect of the Korean high intensity proton accelerator project

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Jonghwa; Song, Tae-Yung [Korea Atomic Energy Research Inst., Yusong, Taejon (Korea, Republic of)

    1998-11-01

    A plan to construct a high current proton accelerator has been proposed by KAERI. We are presenting the required nuclear design to support the project as well as a brief overview of the proposed proton accelerator. The target and core design is highlighted to show feasibility of incineration of minor actinides from the spent fuel of light water reactors. Radiation shielding and activation analyses are also important for the design and the license of the accelerator. (author)

  10. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  11. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  12. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  13. Calculator: A Hardware Design, Math and Software Programming Project Base Learning

    Directory of Open Access Journals (Sweden)

    F. Criado

    2015-03-01

    Full Text Available This paper presents the implementation by the students of a complex calculator in hardware. This project meets hardware design goals, and also highly motivates them to use competences learned in others subjects. The learning process, associated to System Design, is hard enough because the students have to deal with parallel execution, signal delay, synchronization … Then, to strengthen the knowledge of hardware design a methodology as project based learning (PBL is proposed. Moreover, it is also used to reinforce cross subjects like math and software programming. This methodology creates a course dynamics that is closer to a professional environment where they will work with software and mathematics to resolve the hardware design problems. The students design from zero the functionality of the calculator. They are who make the decisions about the math operations that it is able to resolve it, and also the operands format or how to introduce a complex equation into the calculator. This will increase the student intrinsic motivation. In addition, since the choices may have consequences on the reliability of the calculator, students are encouraged to program in software the decisions about how implement the selected mathematical algorithm. Although math and hardware design are two tough subjects for students, the perception that they get at the end of the course is quite positive.

  14. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    Science.gov (United States)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  15. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  16. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  17. STEER Coastal Use Mapping Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Use Mapping Project is designed to collect critical information on human activities in and near the St. Thomas East End Reserves (STEER). The project...

  18. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  19. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  20. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  1. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  2. New synchrotron radiation facility project. Panel on new synchrotron radiation facility project

    CERN Document Server

    Sato, S; Kimura, Y

    2003-01-01

    The project for constructing a new synchrotron radiation facility dedicated to the science in VUV (or EUV) and Soft X-ray (SX) region has been discussed for these two years at the Panel on New Synchrotron Radiation Facility Project. The Panel together with the Accelerator Design Working Group (WG), Beamline Design WG and Research Program WG suggested to the Ministry of Education, Science, Culture and Sports the construction of a 1.8 GeV electron storage ring suitable for 'Top-Up' operation and beamlines and monochromators designed for undulator radiation. The scientific programs proposed by nationwide scientists are summarized with their requirements of the characteristics of the beam. (author)

  3. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  4. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  5. Case Study of a Project-Based Learning Course in Civil Engineering Design

    Science.gov (United States)

    Gavin, K.

    2011-01-01

    This paper describes the use of project-based learning to teach design skills to civil engineering students at University College Dublin (UCD). The paper first considers the development of problem-based leaning (PBL) as a tool in higher education. The general issues to be considered in the design of the curriculum for a PBL module are reviewed.…

  6. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  7. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    Energy Technology Data Exchange (ETDEWEB)

    Benoît, Fabrice, E-mail: fabrice-2.benoit@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Allegretti, Ludovic [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Aumeunier, Marie-Hélène [OPTIS, ZE de La Farlède, F-83078 Toulon Cedex 9 (France); Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Robert, Julien [SOFYNE, F-69800 Saint Priest (France)

    2014-10-15

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule.

  8. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    International Nuclear Information System (INIS)

    Benoît, Fabrice; Allegretti, Ludovic; Aumeunier, Marie-Hélène; Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène; Robert, Julien

    2014-01-01

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule

  9. Arduino projects for dummies

    CERN Document Server

    Craft, Brock

    2013-01-01

    Discover all the amazing things you can do with Arduino Arduino is a programmable circuit board that is being used by everyone from scientists, programmers, and hardware hackers to artists, designers, hobbyists, and engineers in order to add interactivity to objects and projects and experiment with programming and electronics. This easy-to-understand book is an ideal place to start if you are interested in learning more about Arduino's vast capabilities. Featuring an array of cool projects, this Arduino beginner guide walks you through every step of each of the featured projects so

  10. IT Project Prioritization Process

    DEFF Research Database (Denmark)

    Shollo, Arisa; Constantiou, Ioanna

    2013-01-01

    In most of the large companies IT project prioritization process is designed based on principles of evidencebased management. We investigate a case of IT project prioritization in a financial institution, and in particular, how managers practice evidence-based management during this process. We use...... a rich dataset built from a longitudinal study of the prioritization process for the IT projects. Our findings indicate that managers reach a decision not only by using evidence but from the interplay between the evidence and the judgment devices that managers employ. The interplay between evidence...

  11. Design reality gap issues within an ICT4D project:an assessment of Jigawa State Community Computer Center

    OpenAIRE

    Kanya, Rislana Abdulazeez; Good, Alice

    2013-01-01

    This paper evaluates the Jigawa State Government Community Computer centre project using the design reality gap framework. The purpose of this was to analyse the shortfall between design expectations and implementation realities, in order to find out the current situation of the project. Furthermore to analyse whether it would meet the key stakeholder’s expectation. The Majority of Government ICT Projects is classified as either failure or partial failure. Our research will underpin a case st...

  12. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  13. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, Philip [Building Science Corporation, Somerville, MA (United States)

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  14. Implementation of knowledge management approach in project oriented activities. Experience from simulator upgrade project

    International Nuclear Information System (INIS)

    Pironkov, L.

    2010-01-01

    Project specifics: Replacement of analogue process control system with Ovation®based Distributed Control System; Hybrid solution with simulated I&C logic and stimulated Human Machine Interface; Initial design ‐“turn‐key” project based on standard relationship “single customer –single contractor

  15. Distributed Wind Competitiveness Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    2018-02-27

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.

  16. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository.

  17. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    International Nuclear Information System (INIS)

    Schroeder, B.K.

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository

  18. Engineering design and economic evaluation of a family-sized biogas project in Nigeria

    International Nuclear Information System (INIS)

    Adeoti, O.; Ilori, M.O.; Oyebisi, T.O.; Adekoya, L.O.

    2000-01-01

    To woo householders into harnessing the cooking energy potential of biogas in order to solve the perennial cooking energy problems at household level in Nigeria, this paper carried out the engineering design requirement, and used the discounted cash flow micro-economic assessments to evaluate the 6.0 m 3 family-sized biogas project in Nigeria. The project has an initial investment cost of 41,088 Naira, annual expenditure of 5909 Naira and an annual benefit of 13,347 Naira. The NPV, IRR, B/C and payback period of financial analysis are 0.050 million Naira, 17.52%, 2.26 and 6.6 years respectively. This shows that the 6.0 m 3 family-sized biogas project using cattle dung as substrate in Nigeria has a good economic potential. (author)

  19. MIT/Draper Technology Development Partnership Project: Systems Analysis and On-Station Propulsion Subsystem Design

    National Research Council Canada - National Science Library

    Conklin, Theodore

    1998-01-01

    The objective of this thesis is to describe the process for, and the overall design that resulted from the MIT/Draper Project from August, 1996 to May, 1997, including the specific design of the on...

  20. Smart energy households' pilot projects in the Netherlands with a design-driven approach

    NARCIS (Netherlands)

    Geelen, D.V.; Scheepens, A.; Kobus, C.; Obinna, U.; Mugge, R.; Schoormans, J.; Reinders, Angelina H.M.E.

    2013-01-01

    Residential smart grid projects can be evaluated by a design-driven approach, which focuses on gaining insights for successful product and service development by taking the end-users as a starting point. Because only little experience exists with this design-driven approach, this paper addresses how

  1. Coloss project

    International Nuclear Information System (INIS)

    2005-01-01

    The COLOSS project was a shared-cost action, co-ordinated by IRSN within the Euratom Research Framework Programme 1998-2002. Started in February 2000, the project lasted three years. The work-programme performed by 19 partners was shaped around complementary activities aimed at improving severe accident codes. Unresolved risk-relevant issues regarding H2 production, melt generation and the source term were studied, through a large number of experiments such as a) dissolution of fresh and high burn-up UO 2 and MOX by molten Zircaloy, b) simultaneous dissolution of UO 2 and ZrO 2 by molten Zircaloy, c) oxidation of U-O-Zr mixtures by steam, d) degradation-oxidation of B 4 C control rods. Significant results have been produced from separate-effects, semi-global and large-scale tests on COLOSS topics. Break-through were achieved on some issues. Nevertheless, more data are needed for consolidation of the modelling on burn-up effects on UO 2 and MOX dissolution and on oxidation of U-O-Zr and B 4 C-metal mixtures. There was experimental evidence that the oxidation of these mixtures can contribute significantly to the large H2 production observed during the reflooding of degraded cores under severe accident conditions. Based on the experimental results obtained on the COLOSS topics, corresponding models were developed and were successfully implemented in several severe accident codes. Upgraded codes were then used for plant calculations to evaluate the consequences of new models on key severe accident sequences occurring in different plants designs involving B 4 C control rods (EPR, BWR, VVER- 1000) as well as in the TMI-2 accident. The large series of plant calculations involved sensitivity studies and code benchmarks. Main severe accident codes in use in the EU for safety studies were used such as ICARE/CATHARE, SCDAP/RELAP5, ASTEC, MELCOR and MAAP4. This activity enabled: a) the assessment of codes to calculate core degradation, b) the identification of main

  2. Conceptual design report, 200 Area sanitary sewer system: Project 96L-EWL-116

    International Nuclear Information System (INIS)

    Pursley, D.L.

    1994-01-01

    Project L-116 will install an integrated sanitary sewer system in the 200 Area. This new system will connect existing sewer systems for facilities that have a foreseeable future, provide capacity and routing for future facilities, and install new septic sewer systems for existing facilities that cannot be feasibly connected to the new sewer system and have a mission that will extend beyond the year 2000. Project L-116 will construct a sanitary sewer collection, treatment, and disposal system for facilities in the 200-East and -West Areas and adjacent areas located on the 200 Area plateau. The existing septic systems will be abandoned or decommissioned in accordance with applicable Washington State and local codes and regulations. The conceptual design for the sanitary sewer system is designed around population forecasts of 5,000 people for 200-West Area and 9,000 people for 200-East Area. The definitive design will be based on the latest forecast populations at the time definitive design is initiated

  3. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  4. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  5. A proposed framework for conducting pollution prevention design assessments (P2DAs) on U.S. Department of Energy design projects

    International Nuclear Information System (INIS)

    Dorsey, J.A.

    1995-03-01

    The purpose of this manual is to provide a framework for project managers, engineers, and designers to integrate pollution prevention principles and features into DOE design projects. The framework suggested is referred to as the pollution prevention design assessment (P2DA). The P2DA is based on DOE's method for conducting pollution prevention opportunity assessments (PPOAs) on existing waste-generating operations, but the P2DA is modified because the facility or process it assesses does not physically exist during design. Before the P2DA framework is introduced in the manual, recommendations for establishing the P2DA team and budget are provided. Specific pollution prevention requirements and opportunities for each design stage as delineated in DOE Order 4700.1 Project Management System are also discussed and a sample format for drafting a P2DA report is provided in the appendix. The scope of this manual includes not only the P2DA framework, but also a background discussion of pollution prevention and related topics; the regulatory requirements mandating design for pollution prevention; the benefits and barriers of designing for pollution prevention; and the impact that pollution prevention and related environmental avoidance concepts have had on the engineering profession

  6. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  7. The Effect of STEM Learning through the Project of Designing Boat Model toward Student STEM Literacy

    Science.gov (United States)

    Tati, T.; Firman, H.; Riandi, R.

    2017-09-01

    STEM Learning focusses on development of STEM-literate society, the research about implementation of STEM learning to develope students’ STEM literacy is still limited. This study is aimed to examine the effect of implementation STEM learning through the project of designing boat model on students STEM literacy in energy topic. The method of this study was a quasi-experiment with non-randomized pretest-posttest control group design. There were two classes involved, the experiment class used Project Based Learning with STEM approach and control class used Project-Based Learning without STEM approach. A STEM Literacy test instrument was developed to measure students STEM literacy which consists of science literacy, mathematics literacy, and technology-engineering literacy. The analysis showed that there were significant differences on improvement science literacy, mathematics technology-engineering between experiment class and control class with effect size more than 0.8 (large effect). The difference of improvement of STEM literacy between experiment class and control class is caused by the existence of design engineering activity which required students to apply the knowledge from every field of STEM. The challenge that was faced in STEM learning through design engineering activity was how to give the students practice to integrate STEM field in solving the problems. In additional, most of the students gave positive response toward implementation of STEM learning through design boat model project.

  8. Design-Build-Finance in the US: The case of iROX, I-75 Road Expansion Project

    OpenAIRE

    Forcael,E; Ellis, JR,R; Jaramillo,F

    2011-01-01

    This project is part of the Interstate 75 road expansion, located in Southwest Florida and consisted of an expansion from four to six lanes along a 30-mile stretch. The paper presents a design, build and finance (DBF) approach applied to a US highway. This work focuses on the financial structure of the project, which did not include a concession (operation); the bidding procedure, which took into account an interesting bid evaluation criterion and; project management matters. The information ...

  9. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  10. Nature-inspired design strategies in sustainable product development : A case study of student projects

    NARCIS (Netherlands)

    De Pauw, I.C.; Karana, E.; Kandachar, P.V.

    2012-01-01

    In design practice, Nature-Inspired Design Strategies (NIDS) can be applied when developing sustainable products. However, knowledge on how this actually helps designers is lacking. This study explores the effects of applying Cradle to Cradle and Biomimicry in student projects, as compared to using

  11. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  12. Geoscience Diversity Enhancement Project: Student Responses.

    Science.gov (United States)

    Rodrigue, Christine M.; Wechsler, Suzanne P.; Whitney, David J.; Ambos, Elizabeth L.; Ramirez-Herrera, Maria Teresa; Behl, Richard; Francis, Robert D.; Larson, Daniel O.; Hazen, Crisanne

    This paper describes an interdisciplinary project at California State University (Long Beach) designed to increase the attractiveness of the geosciences to underrepresented groups. The project is called the Geoscience Diversity Enhancement Project (GDEP). It is a 3-year program which began in the fall of 2001 with funding from the National Science…

  13. 50 CFR 253.22 - State projects.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false State projects. 253.22 Section 253.22... State projects. (a) General—(1) Designation of state agency. The Governor of each state shall notify the... participation under the Act, to sign project documents, and to receive payments. (2) States that choose to...

  14. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  15. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  16. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  17. Virtual Machine in Automation Projects

    OpenAIRE

    Xing, Xiaoyuan

    2010-01-01

    Virtual machine, as an engineering tool, has recently been introduced into automation projects in Tetra Pak Processing System AB. The goal of this paper is to examine how to better utilize virtual machine for the automation projects. This paper designs different project scenarios using virtual machine. It analyzes installability, performance and stability of virtual machine from the test results. Technical solutions concerning virtual machine are discussed such as the conversion with physical...

  18. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  19. The Swedish satellite project Viking

    International Nuclear Information System (INIS)

    Hultqvist, B.

    1990-01-01

    The Swedish satellite project Viking is described and related to earlier missions. Some new operational characteristics are discussed, including the real-time data analysis campaigns that were an important part of the project. Some areas of important scientific impact of the project are also described. Viking was specially designed and equipped for investigation of plasma physical acceleration and other processes in the transition region between hot and cold plasma on auroral latitude magnetic field lines

  20. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  1. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  2. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  3. Design of retinal-projection-based near-eye display with contact lens.

    Science.gov (United States)

    Wu, Yuhang; Chen, Chao Ping; Mi, Lantian; Zhang, Wenbo; Zhao, Jingxin; Lu, Yifan; Guo, Weiqian; Yu, Bing; Li, Yang; Maitlo, Nizamuddin

    2018-04-30

    We propose a design of a retinal-projection-based near-eye display for achieving ultra-large field of view, vision correction, and occlusion. Our solution is highlighted by a contact lens combo, a transparent organic light-emitting diode panel, and a twisted nematic liquid crystal panel. Its design rules are set forth in detail, followed by the results and discussion regarding the field of view, angular resolution, modulation transfer function, contrast ratio, distortion, and simulated imaging.

  4. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  5. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  6. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  7. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  8. Project management plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1995-01-01

    This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversion box catch tank which has been removed from service

  9. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  10. Status of CSNS project

    International Nuclear Information System (INIS)

    Zhang, J.; Fu, S.N.; Chen, H.S.

    2015-01-01

    The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planned to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project. (author)

  11. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  12. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  13. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  14. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  15. Advantages of using 3D design tools in the nuclear power plants projects

    International Nuclear Information System (INIS)

    Roldan, P.; Melendro, J.; Gomez, A.; Hermana, I.

    2011-01-01

    It there is anything that distinguished Iberdrola Ingeneria y Construccion, as part of the Iberdrola Group, it is its firm commitment to innovation and continuous improvement. This is the philosophy that led the company to its interest in three-dimensional design tools back when they were in an early stage of development : very little international implementation, lack of integration with other applications, absence of previous experiences to understand the best possible configuration for each case, etc. Nevertheless, the company was able to see the tremendous advantage of having a construction program in the early months of a project- a detailed program that could predict, and therefore avoid, the problems that, if not anticipated, would arise in the construction phase when they result in higher costs, longer timeframes and a multitude of complications. This is precisely what 3D design tools offer prediction and this has been proven in the latest combined cycle projects executed with these tools. A project executed without errors not only decreases cost and time overruns, but also necessarily increases the quality of the end result. Efficiency and quality: these are both basic goals of Iberdrola Ingenieria y Construccion. The knowledge of and skill in the use of these tools have grown at the same time that their development has reached increasingly higher levels. As a result, Iberdrola Ingenieria y Conctruccion now has extensive experience in the use of 3D design tools and is prepared for the future challenges posed by these tools, the capabilities of which have attained such heights that it is possible to take on one of the most technically challenging projects that exists a nuclear power plant. And we are ready. (Author)

  16. Tall-Building Projects Sustainability Indicator (TPSI: A New Design and Environmental Assessment Tool for Tall Buildings

    Directory of Open Access Journals (Sweden)

    Hasim Altan

    2012-04-01

    Full Text Available The paper presents the features of Tall-building Projects Sustainability Indicator (TPSI—a “Sustainability Rating System” that specializes in tall-building projects. The system comprises two components; the “Technical Manual” in the form of a booklet and the “Calculator” in the form of an Excel tool. It can be used as a “design tool” and/or as a “checklist” to compare and to improve the sustainable performance of tall-building design schemes. At the same time, the system can be used to evaluate the sustainability of existing tall-building projects. The first version of the TPSI rating system (TPSI 2012 Version was released as an online tool (GreenLight and thoroughly examined and validated by multiple parties.

  17. Contrasting the Views and Actions of Data Collectors and Data Consumers in a Volunteer Water Quality Monitoring Project: Implications for Project Design and Management

    Directory of Open Access Journals (Sweden)

    Caren B. Cooper

    2017-12-01

    Full Text Available Data collection or generation is the primary way that the majority of volunteers advance the scientific goals of citizen science projects, but other activities such as data consumption also may influence learning, civic, and conservation outcomes. Project designers and managers balance goals for multiple outcomes and thus need to consider the influence of all project-related activities on outcomes. In a study of the kayak-based Citizen’s Water Quality Testing (CWQT Program in New York City, we compared the characteristics, perceptions, and behaviors of those collecting and using CWQT data (data collectors and those solely using the data (data consumers. Data collectors (n = 40 and consumers (n = 24 were similar in gender and political orientation, but collectors were younger, devoted more time to the project, and experienced far more face-to-face interactions related to the project. Data collectors and consumers had similar motivations for participation, except that collectors were more likely motivated by recognition for their efforts. Lack of free time was the largest barrier to participation for both types of participants, and a significantly greater barrier for consumers. Data collectors and consumers trusted volunteer-collected data more than government-collected data. Collectors and consumers both recognized multiple scientific, environmental, and social benefits associated with the project, and both were equally likely to use volunteer-collected data for a variety of purposes, such as informing decisions about conservation and recreation. Importantly, both groups were equally likely to undertake a suite of conservation behaviors. We synthesize and expand current conceptual frameworks of citizen science participation and outcomes, highlighting the need for further study to understand mechanisms and linkages between the varied activities of citizen science projects and broader social and ecological impacts. To achieve conservation goals

  18. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  19. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  20. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  1. Organizational Enablers for Project Governance and Governmentality in Project-based Organizations

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Müller, Ralf; Shao, Jingting

    for governmentality belong mainly to the cultural-cognitive pillar. Collectively these OEs provide for an ambidexterity of flexibility and stability, which allows organizations to align their internal characteristics with their organizational context. Managerial and theoretical implications of the results......This study identifies organizational enablers (OEs) for governance and governmentality in the realm of projects in project-based organizations (PBOs). We use a multiple case study design with six firms in Sweden and China to identify OEs. Institutional theory serves as theoretical perspective...

  2. Organizational Enablers for Project Governance and Governmentality in Project-based Organizations

    DEFF Research Database (Denmark)

    Müller, Ralf; Pemsel, Sofia; Shao, Jingting

    2015-01-01

    for governmentality belong mainly to the cultural–cognitive pillar. Collectively these OEs provide for an ambidexterity of flexibility and stability, which allows organizations to align their internal characteristics with their organizational context. Managerial and theoretical implications of the results......This study identifies organizational enablers (OEs) for governance and governmentality in the realm of projects in project-based organizations (PBOs). We use a multiple case study design with six firms in Sweden and China to identify OEs. Institutional theory serves as theoretical perspective...

  3. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  4. EBT-P project status report

    International Nuclear Information System (INIS)

    1983-11-01

    This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project

  5. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  6. An Architecture Design Project: "Building" Understanding

    Science.gov (United States)

    Bush, Sarah B.; Albanese, Judith; Karp, Karen S.; Karp, Matthew

    2017-01-01

    Middle school students need relevant, meaningful contexts to apply emerging mathematical ideas. In this project, through the context of an architecture investigation, seventh-grade students engaged in mathematics involving area, surface area, volume, ratios and proportional thinking, number sense, and technology integration. Students, working in…

  7. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  8. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students†

    OpenAIRE

    Beach, Dale L.; Alvarez, Consuelo J.

    2015-01-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniq...

  9. The status of US Teraflops-scale projects

    International Nuclear Information System (INIS)

    Mawhinney, R.D.

    1995-01-01

    The current status of United States projects pursuing Teraflops-scale computing resources for lattice field theory is discussed. Two projects are in existence at this time: the Multidisciplinary Teraflops Project, incorporating the physicists of the QCD Teraflops Collaboration, and a smaller project, centered at Columbia, involving the design and construction of a 0.8Teraflops computer primarily for QCD. ((orig.))

  10. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  11. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  12. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  13. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  14. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  15. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  16. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  17. Statement on current progress of the EPR project. Basic Design phase concluded

    International Nuclear Information System (INIS)

    Lamprecht, F.

    1997-01-01

    Against the background of expected increasing demand for electric power worldwide it is obvious that any existing technology for electricity generation will be required in the future to meet the demand, just as well as technology improvements. Nuclear industry's answer to this challenge are activities for further evolution of the PWR concept as a joint venture of France and Germany for development of the European Pressurized Water Reactor (EPR). The project participants are reactor manufacturers and operators of both countries as well as organisations responsible for reactor safety. The Basic Design phase which started in 1995, after prior definition of the common safety philosophy, has recently been concluded. The results have been presented at a meeting in October 1997 in Cologne, organised by KTG and SFEN, the countries' respective nuclear societies. The broad statement is that project work was successful in achieving two major objectives: A well-balanced safety concept, and a competitive design. (orig./CB) [de

  18. Making Communication Matter: Integrating Instruction, Projects and Assignments to Teach Writing and Design

    Science.gov (United States)

    Riddell, William T.; Courtney, Jennifer; Constans, Eric; Dahm, Kevin; Harvey, Roberta; von Lockette, Paris

    2010-01-01

    An integrated technical writing and design course has been developed at Rowan University. This course was developed using aspects of project-based learning and recent discussions about design education, as well as pedagogical approaches from the write-to-learn and the writing in the disciplines (WID) movements. The result is a course where the…

  19. Basic research in support of innovative fuels design for the Generation IV systems (F-BRIDGE project)

    International Nuclear Information System (INIS)

    Valot, Carole; Bertolus, Marjorie; Konings, Rudy; Somers, Joe; Groot, Sander de

    2010-01-01

    F-BRIDGE (Basic Research in support of Innovative Fuels Design for the GEN IV systems) is a 4-year project which started in 2008. It seeks to bridge the gap between basic research and technological applications for generation IV nuclear reactor systems. One of the challenges for the next generation of reactors is to significantly increase the efficiency in designing innovative fuels. The object of the F-BRIDGE project is to complement the empirical approach by a physically-based description of fuel and cladding materials to enable a rationalization of the design process and a better selection of promising fuel systems. Advanced modelling and separate effects experiments are carried out in order to obtain more exact physical descriptions of ceramic fuels and cladding, at relevant scales from the atomic to the macroscopic scale. Research is also focused on assessing and improving 'sphere-pac' fuel, a composite-ceramics concept which has shown promise. The project activities can be broken down into four main areas: (i) Basic research investigations using a multi-scale approach in both experimentation and modelling to enable the generation of missing basic data, the identification of relevant mechanisms and the development of appropriate models; (ii) Transfer between technological issues and basic research by bringing together within the same project materials scientists, engineers and end-users; (iii) Assessment of the drawbacks and benefits of the sphere-pac fuel application to various Generation IV systems; (iv) Education and training to promote research in the field of fuel materials, to ensure the exchange of results and ideas among the participants and to link the project with other related European or international initiatives. The project relies on the complementary expertise of 19 partners: nuclear and non nuclear research organisations, universities, a nuclear engineering company, as well as technology and project management consultancy small and medium

  20. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  1. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  2. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  3. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  4. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  5. Design, development and deployment of a hand/wrist exoskeleton for home-based rehabilitation after stroke - SCRIPT project

    OpenAIRE

    Amirabdollahian, F; Ates, Sedar; Basteris, A.; Cesario, A.; Buurke, Jaap; Hermens, Hermanus J.; Hofs, D.; Johansson, E.; Mountain, G.; Nasr, N.; Nijenhuis, S.M.; Prange, Grada Berendina; Rahman, N.; Sale, P.; Schätzlein, F.

    2014-01-01

    Objective: this manuscript introduces the Supervised Care and Rehabilitation Involving Personal Tele-robotics (SCRIPT) project. The main goal is to demonstrate design and development steps involved in a complex intervention, while examining feasibility of using an instrumented orthotic device for home-based rehabilitation after stroke. Methods: the project uses a user-centred design methodology to develop a hand/wrist rehabilitation device for home-based therapy after stroke. The patient bene...

  6. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  7. An extension to artifact-free projection overlaps

    International Nuclear Information System (INIS)

    Lin, Jianyu

    2015-01-01

    Purpose: In multipinhole single photon emission computed tomography, the overlapping of projections has been used to increase sensitivity. Avoiding artifacts in the reconstructed image associated with projection overlaps (multiplexing) is a critical issue. In our previous report, two types of artifact-free projection overlaps, i.e., projection overlaps that do not lead to artifacts in the reconstructed image, were formally defined and proved, and were validated via simulations. In this work, a new proposition is introduced to extend the previously defined type-II artifact-free projection overlaps so that a broader range of artifact-free overlaps is accommodated. One practical purpose of the new extension is to design a baffle window multipinhole system with artifact-free projection overlaps. Methods: First, the extended type-II artifact-free overlap was theoretically defined and proved. The new proposition accommodates the situation where the extended type-II artifact-free projection overlaps can be produced with incorrectly reconstructed portions in the reconstructed image. Next, to validate the theory, the extended-type-II artifact-free overlaps were employed in designing the multiplexing multipinhole spiral orbit imaging systems with a baffle window. Numerical validations were performed via simulations, where the corresponding 1-pinhole nonmultiplexing reconstruction results were used as the benchmark for artifact-free reconstructions. The mean square error (MSE) was the metric used for comparisons of noise-free reconstructed images. Noisy reconstructions were also performed as part of the validations. Results: Simulation results show that for noise-free reconstructions, the MSEs of the reconstructed images of the artifact-free multiplexing systems are very similar to those of the corresponding 1-pinhole systems. No artifacts were observed in the reconstructed images. Therefore, the testing results for artifact-free multiplexing systems designed using the

  8. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  9. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  10. DOUBLE-WALL COLLIMATOR DESIGN OF THE SNS PROJECT

    International Nuclear Information System (INIS)

    SIMOS, N.; LUDEWIG, H.; CATALAN-LASHERAS, N.; CRIVELLO, S.

    2001-01-01

    The collimator absorber array of the Spallation Neutron Source (SNS) project is responsible for stopping the 1.0 GeV protons that are in the halo of the beam. It is estimated that 0.1% of the 2 MW beam will be intercepted by the adopted collimating scheme implemented at various sections of the beam transport and accumulation. This paper summarizes the conceptual design of the collimator absorber as well as the supporting detailed analysis that were performed and guided the design process. Key requirement in the design process is the need for the collimator beam tube to minimize beam impedance while closely following its beta function. Due to lack of available experimental data, the long-term behavior of irradiated materials in an environment where they interface with coolant flow becomes an issue. Uncertainties in the long-term behavior prompted a special double-wall design that will enable not only beam halo interception but also the efficient transfer of deposited energy both under normal and off-normal conditions to the coolant flow. The thermo-mechanical response of the double wall beam tube and of a particle bed surrounding it are discussed in detail in the paper

  11. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  12. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  13. California Hydrogen Infrastructure Project

    Energy Technology Data Exchange (ETDEWEB)

    Heydorn, Edward C

    2013-03-12

    Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling

  14. Iranian ethylene project

    Energy Technology Data Exchange (ETDEWEB)

    Laugier, J.P.; Handels, J.W.; Overwater, J.; Zielinski, E. [Technip-Coflexip (Iran)

    2002-04-01

    The authors discuss design optimization plans for the world's largest olefins project in Iran. The design has been optimised for both low investment cost and low operating cost. The ways in which this was achieved are outlined under the headings: furnaces, fractionation, hydrogenation, cooling medium and steam system. (UK)

  15. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  16. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J; Kaut, W [eds.

    1991-01-01

    This book, the proceedings of the fourth PV-Contractors' Meeting organized by the Commission of the European Communities, Directorate-General for Energy, held at Brussels on 21 and 22 November 1989, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the Energy Demonstration Program since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984, 1985 and 1986, describing progress with their projects. Summaries of the discussions held at the meeting, which included contractors whose projects were submitted in 1987, are also presented. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include desalination, communications, dairy farms, water pumping, and warning systems. Papers have been processed separately for inclusion on the data base.

  17. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  18. The characteristics and interpretability of land surface change and implications for project design

    Science.gov (United States)

    Sohl, Terry L.; Gallant, Alisa L.; Loveland, Thomas R.

    2004-01-01

    The need for comprehensive, accurate information on land-cover change has never been greater. While remotely sensed imagery affords the opportunity to provide information on land-cover change over large geographic expanses at a relatively low cost, the characteristics of land-surface change bring into question the suitability of many commonly used methodologies. Algorithm-based methodologies to detect change generally cannot provide the same level of accuracy as the analyses done by human interpreters. Results from the Land Cover Trends project, a cooperative venture that includes the U.S. Geological Survey, Environmental Protection Agency, and National Aeronautics and Space Administration, have shown that land-cover conversion is a relatively rare event, occurs locally in small patches, varies geographically and temporally, and is spectrally ambiguous. Based on these characteristics of change and the type of information required, manual interpretation was selected as the primary means of detecting change in the Land Cover Trends project. Mixtures of algorithm-based detection and manual interpretation may often prove to be the most feasible and appropriate design for change-detection applications. Serious examination of the expected characteristics and measurability of change must be considered during the design and implementation phase of any change analysis project.

  19. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  20. Design criteria and design basis for the 100-HR-3 and 100-KR-4 pump-and-treat projects

    International Nuclear Information System (INIS)

    McKinley, W.S.; Winters, J.N.

    1996-06-01

    The 100-HR-3 and 100-KR-4 Operable Units are located in the 100 Area at the Hanford Site in Richland, Washington. The document describes the project objectives and design criteria to be used for the 100-HR-3 and 100-KR-4 groundwater pump-and-treat design activities

  1. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  2. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  3. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  4. Design basis event consequence analyses for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Orvis, D.D.; Haas, M.N.; Martin, J.H.

    1997-01-01

    Design basis event (DBE) definition and analysis is an ongoing and integrated activity among the design and analysis groups of the Yucca Mountain Project (YMP). DBE's are those that potentially lead to breach of the waste package and waste form (e.g., spent fuel rods) with consequent release of radionuclides to the environment. A Preliminary Hazards Analysis (PHA) provided a systematic screening of external and internal events that were candidate DBE's that will be subjected to analyses for radiological consequences. As preparation, pilot consequence analyses for the repository subsurface and surface facilities have been performed to define the methodology, data requirements, and applicable regulatory limits

  5. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  6. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  7. Allowing for MSD prevention during facilities planning for a public service: an a posteriori analysis of 10 library design projects.

    Science.gov (United States)

    Bellemare, Marie; Trudel, Louis; Ledoux, Elise; Montreuil, Sylvie; Marier, Micheline; Laberge, Marie; Vincent, Patrick

    2006-01-01

    Research was conducted to identify an ergonomics-based intervention model designed to factor in musculoskeletal disorder (MSD) prevention when library projects are being designed. The first stage of the research involved an a posteriori analysis of 10 recent redesign projects. The purpose of the analysis was to document perceptions about the attention given to MSD prevention measures over the course of a project on the part of 2 categories of employees: librarians responsible for such projects and personnel working in the libraries before and after changes. Subjects were interviewed in focus groups. Outcomes of the analysis can guide our ergonomic assessment of current situations and contribute to a better understanding of the way inclusion or improvement of prevention measures can support the workplace design process.

  8. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  9. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  10. Time for Decarbonization of Conservation and Development Projects? The Political Ecology of Carbon Projects

    Directory of Open Access Journals (Sweden)

    Pierre L. Ibisch

    2015-01-01

    Full Text Available The globe's first carbon projects were designed and implemented approximately 20 years ago following scientific insights that emissions of greenhouse gases needed to be mitigated. Visible in some of these early projects were the important aspects of social governance and local benefit sharing. The projects promised to be a panacea to environmental, social and economic problems in remote rural areas of developing countries. However, it took another decade before a wave of hundreds of carbon projects were launched. Many of the projects were offered under the mechanism of REDD+ (Reducing Emissions from Deforestation and forest Degradation, plus the role of conservation, sustainable forest management and carbon enhancement, as well as under a variety of voluntary schemes and national programs, public-private partnerships, and forestry-based investment initiatives. As decision-makers prepare the Conference of the Parties of the United Nations Framework Convention on Climatic Change in Paris (COP21, Earthscan has released a book entitled `Carbon conflicts and forest landscapes in Africa', edited by Melissa Leach and Ian Scoones. According to the editors, the focus of the book is on what happens on the ground when carbon forestry projects arrive, what types of projects work, and, equally important, what doesn’t work.

  11. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  12. 6 Sigma project advance

    International Nuclear Information System (INIS)

    2002-12-01

    This book deals with 6 sigma project advance which introduces 6 sigma project in Changwon special steel, how is failure accepted? CTQ selection which is starting line, definition of performance standard, measurement system check on reliability of measurement data, check of process capacity for current level, establishment of target, optimal design and performance of application, practice of management system for maintain of improved result, CTQ selection, check of measurement system and practice of management system.

  13. Route planning algorithms: Planific@ Project

    Directory of Open Access Journals (Sweden)

    Gonzalo Martín Ortega

    2009-12-01

    Full Text Available Planific@ is a route planning project for the city of Madrid (Spain. Its main aim is to develop an intelligence system capable of routing people from one place in the city to any other using the public transport. In order to do this, it is necessary to take into account such things as: time, traffic, user preferences, etc. Before beginning to design the project is necessary to make a comprehensive study of the variety of main known route planning algorithms suitable to be used in this project.

  14. The FIFE Project at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Box, D. [Fermilab; Boyd, J. [Fermilab; Di Benedetto, V. [Fermilab; Ding, P. [Fermilab; Dykstra, D. [Fermilab; Fattoruso, M. [Fermilab; Garzoglio, G. [Fermilab; Herner, K. [Fermilab; Levshina, T. [Fermilab; Kirby, M. [Fermilab; Kreymer, A. [Fermilab; Mazzacane, A. [Fermilab; Mengel, M. [Fermilab; Mhashilkar, P. [Fermilab; Podstavkov, V. [Fermilab; Retzke, K. [Fermilab; Sharma, N. [Fermilab

    2016-01-01

    The FabrIc for Frontier Experiments (FIFE) project is an initiative within the Fermilab Scientific Computing Division designed to steer the computing model for non-LHC Fermilab experiments across multiple physics areas. FIFE is a collaborative effort between experimenters and computing professionals to design and develop integrated computing models for experiments of varying size, needs, and infrastructure. The major focus of the FIFE project is the development, deployment, and integration of solutions for high throughput computing, data management, database access and collaboration management within an experiment. To accomplish this goal, FIFE has developed workflows that utilize Open Science Grid compute sites along with dedicated and commercial cloud resources. The FIFE project has made significant progress integrating into experiment computing operations several services including a common job submission service, software and reference data distribution through CVMFS repositories, flexible and robust data transfer clients, and access to opportunistic resources on the Open Science Grid. The progress with current experiments and plans for expansion with additional projects will be discussed. FIFE has taken the leading role in defining the computing model for Fermilab experiments, aided in the design of experiments beyond those hosted at Fermilab, and will continue to define the future direction of high throughput computing for future physics experiments worldwide.

  15. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  16. Optimising Impact in Astronomy for Development Projects

    Science.gov (United States)

    Grant, Eli

    2015-08-01

    Positive outcomes in the fields of science education and international development are notoriously difficult to achieve. Among the challenges facing projects that use astronomy to improve education and socio-economic development is how to optimise project design in order to achieve the greatest possible benefits. Over the past century, medical scientists along with statisticians and economists have progressed an increasingly sophisticated and scientific approach to designing, testing and improving social intervention and public health education strategies. This talk offers a brief review of the history and current state of `intervention science'. A similar framework is then proposed for astronomy outreach and education projects, with applied examples given of how existing evidence can be used to inform project design, predict and estimate cost-effectiveness, minimise the risk of unintended negative consequences and increase the likelihood of target outcomes being achieved.

  17. It takes two to tango : Investigating the antecedents and consequences of effective collaboration between designers and managers in innovation projects

    NARCIS (Netherlands)

    Tabeau, K.E.

    2016-01-01

    Designers are increasingly playing a strategic role in innovation projects. They can do this, amongst others, by more effectively collaborating with the managers of these projects. This thesis investigates the antecedents and consequences of effective collaboration between designers and managers in

  18. Project Exodus

    Science.gov (United States)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  19. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  20. Project communication in an internal strategic perspective

    DEFF Research Database (Denmark)

    Ramsing, Line B.

    2009-01-01

    corporate communication. Originality/value - By challenging the use of the term 'project communication' and extending the concept by defining the aspect of interpersonal project communication and its potential in creating synthesis between the research fields corporate communication and project managment....... of interpersonal project communication? Design/methodology/approach - Based on a literature review of the two above mentioned fields of research the discussion of the potential of interpersonal project communication  is put in relation to concepts of power relations in an organisation, use of networks...... there is no mentioning of project communication. Despite the acknowledged need to focus on communication as a whole in projects there is no indication in the literature that any collaboration exists between the field of corporate communication and the field of project management - creating a gap at the intersection...