WorldWideScience

Sample records for project design process

  1. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  2. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  3. Solar hydrogen project - Thermochemical process design

    Energy Technology Data Exchange (ETDEWEB)

    Allen, D.J.; Ng, L.F.; Rao, M.S.M.; Wu, S.F.; Zoschak, R.J.

    1984-08-01

    The thermochemical decomposition of water using solar energy offers an elegant way of combining solar and chemical technologies to produce a high quality fuel. The DOE has sponsored Foster Wheeler to develop a process design for a solar water-splitting process based on the sulfuric acid/iodine cycle. The study has centered around the design of a sulfuric acid decomposition reactor and the central receiver. Materials' properties impose severe constraints upon the design of decomposition reactor. In this paper, the constraints imposed on the design are specified and a reactor and receiver design is presented together with a preliminary design of the balance of plant.

  4. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  5. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  6. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik

    2010-01-01

    Reaction Engineering. In order to incorporate reactor design into process design in a meaningful way, the teachers of the respective courses need to collaborate (Standard 9 – Enhancement of Faculty CDIO skills). The students also see that different components of the chemical engineering curriculum relate......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...... of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B...

  7. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  8. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  9. How does sustainability certification affect the design process? Mapping final design projects at an architectural office

    DEFF Research Database (Denmark)

    Landgren, Mathilde; Jensen, Lotte Bjerregaard

    2017-01-01

    process and informing the industry of them. This has led to optimised design processes such as Integrated Energy Design, in which many decisions related to energy consumption and indoor climate are made in the early design stages. The current tendency is to use an expanded notion of sustainability......, derived from the sustainability certification system itself, and to apply it even in the early design process. This perspective emphasises all phases of the life cycle of a building. The goal of the present study was to map how a Danish architectural office approached sustainability in the projects......The context of the study is the very strict regulation of energy consumption for operating buildings in Denmark. It is difficult to meet the requirements by system optimisation in the final design phase, so recent research has focused on ways of meeting the target by adapting the whole design...

  10. Developing 21st Century Process Skills through Project Design

    Science.gov (United States)

    Yoo, Jeong-Ju; MacDonald, Nora M.

    2014-01-01

    The goal of this paper is to illustrate how the promotion of 21st Century process skills can be used to enhance student learning and workplace skill development: thinking, problem solving, collaboration, communication, leadership, and management. As an illustrative case, fashion merchandising and design students conducted research for a…

  11. Process performance indicators in project pre-design stage

    NARCIS (Netherlands)

    Haponava, T.; Al-Jibouri, Saad H.S.; Reymen, Isabelle; Scheublin, F.; Pronk, A.; Prins, M.; Emmitt, S.; den Otter, A

    2006-01-01

    Traditionally performance in construction is measured based on the "iron-triangle”- time, cost and quality. In recent years indicators have been developed to include the measurements of other aspects of project performance. The main shortcoming of these however is that most of them are lagging

  12. Waste Receiving and Processing Facility, Module 1: Volume 7, Project design criteria

    International Nuclear Information System (INIS)

    1992-03-01

    This Project Design Criteria document for the WRAP facility at the Hanford Site is presented within a systems format. The WRAP Module 1 facility has been categorized into eight (8) engineering systems for design purposes. These systems include: receiving, shipping and storage, nondestructive assay/nondestructive examination (NDA/NDE), waste process, internal transportation, building, heating ventilation and air conditioning (HVAC), process control, and utilities. Within each system section of this document, the system-specific requirements are identified. The scope of the system is defined, the design goals are identified and the functional requirements are detailed

  13. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  14. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  15. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  16. Design Processes

    DEFF Research Database (Denmark)

    Ovesen, Nis

    2009-01-01

    Inspiration for most research and optimisations on design processes still seem to focus within the narrow field of the traditional design practise. The focus in this study turns to associated businesses of the design professions in order to learn from their development processes. Through interviews...... and emerging production methods....

  17. New process modeling[sic], design, and control strategies for energy efficiency, high product quality, and improved productivity in the process industries. Final project report; FINAL

    International Nuclear Information System (INIS)

    Ray, W. Harmon

    2002-01-01

    This project was concerned with the development of process design and control strategies for improving energy efficiency, product quality, and productivity in the process industries. In particular, (i) the resilient design and control of chemical reactors, and (ii) the operation of complex processing systems, was investigated. Specific topics studied included new process modeling procedures, nonlinear controller designs, and control strategies for multiunit integrated processes. Both fundamental and immediately applicable results were obtained. The new design and operation results from this project were incorporated into computer-aided design software and disseminated to industry. The principles and design procedures have found their way into industrial practice

  18. IT Project Prioritization Process

    DEFF Research Database (Denmark)

    Shollo, Arisa; Constantiou, Ioanna

    2013-01-01

    In most of the large companies IT project prioritization process is designed based on principles of evidencebased management. We investigate a case of IT project prioritization in a financial institution, and in particular, how managers practice evidence-based management during this process. We use...... a rich dataset built from a longitudinal study of the prioritization process for the IT projects. Our findings indicate that managers reach a decision not only by using evidence but from the interplay between the evidence and the judgment devices that managers employ. The interplay between evidence...

  19. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  20. Decision Process Analysis on Project Priority Strategy: A Case Study of an ICT Design Firm

    Directory of Open Access Journals (Sweden)

    Vincent F. Yu

    2014-01-01

    Full Text Available Project priority strategy is the benchmarking of a corporate operation management strategy and in particular is used by a projects-based research and development firm in the complex competence environment of the information and communication technology (ICT industry. This research takes the variables of external environments and internal resources into account for a firm’s market, technology, and finance assets in order to present a decision process on a project priority strategy. This empirical study also addresses the key factors of the interaction between business on a project development’s supply chain: clients, the examined firm, and suppliers. The findings indicate that a profit-driven project can dominate the firm’s strategic operations and management from the resource-based view and analytic hierarchy process technique perspectives. At the same time, the analysis results contribute significant values to project decision management, which is highly recommended for small-medium enterprises conducting product/project development, project portfolio management, and strategic business management.

  1. Project C-018H, 242-A Evaporator/PUREX Plant Process Condensate Treatment Facility, functional design criteria. Revision 3

    International Nuclear Information System (INIS)

    Sullivan, N.

    1995-01-01

    This document provides the Functional Design Criteria (FDC) for Project C-018H, the 242-A Evaporator and Plutonium-Uranium Extraction (PUREX) Plant Condensate Treatment Facility (Also referred to as the 200 Area Effluent Treatment Facility [ETF]). The project will provide the facilities to treat and dispose of the 242-A Evaporator process condensate (PC), the Plutonium-Uranium Extraction (PUREX) Plant process condensate (PDD), and the PUREX Plant ammonia scrubber distillate (ASD)

  2. Yucca Mountain Project: ESF Title I design control process review report

    International Nuclear Information System (INIS)

    1989-01-01

    The Exploratory Shaft Facility (ESF) Title 1 Design Control Process Review was initiated in response to direction from the Office of Civilian Radioactive Waste Management (OCRWM) (letter: Kale to Gertz, NRC Concerns on Title 1 Design Control Process, November 17, 1988). The direction was to identify the existing documentation that described ''hor-ellipsis the design control process and the quality assurance that governed hor-ellipsis'' (a) the development of the requirements documents for the ESF design, (b) the various interfaces between activities, (c) analyses and definitions leading to additional requirements in the System Design Requirements Documents and, (d) completion of Title 1 Design. This report provides historical information for general use in determining the extent of the quality assurance program in existence during the ESF Title 1 Design

  3. ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities

    CERN Document Server

    Dayley, L

    2000-01-01

    The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupational Radiation Protection. The basic requirements for the performance of ALARA design reviews are presented in the Hanford Site Radiological Control Manual (HSRCM). The HSRCM has established trigger levels requiring radiological reviews of non-routine or complex work activities. These requirements are implemented in site procedures HNF-PRO-1622 and 1623. HNF-PRO-1622 Radiological Design Review Process requires that ''radiological design reviews [be performed] of new facilities and equipment and modifications of existing facilities and equipment''. In addition, HNF-PRO-1623 Radiological Work Planning Process requires a formal ALARA Review for planned activities that are estimated to exceed 1 person-rem total Dose Equivalent (DE). The purpose of this review is to validate that the original design for the PFP Cementation Process ensures that the principles of ALARA (As Low As Reasonably Achievable) were included...

  4. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  5. Spent nuclear fuel project cold vacuum drying facility process water conditioning system design description

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1998-01-01

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Process Water Conditioning (PWC) System. The SDD was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), the HNF-SD-SNF-DRD-O02, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the PWC equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  6. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  7. Design and construction of the defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.

    1986-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level radioactive waste at the Savannah River Plant (SRP) near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes by immobilizing the waste in Processing Facility (DWPF) will solidify existing and future radioactives wastes by immobilizing the waste in borosilicate glass contained in stainless steel canisters. The canisters will be sealed, decontaminated and stored, prior to emplacement in a federal repository. At the present time, engineering and design is 90% complete, construction is 25% complete, and radioactive processing in the $870 million facility is expected to begin by late 1989. This paper describes the SRP waste characteristics, the DWPF processing, building and equipment features, and construction progress of the facility

  8. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  9. The Michelin uranium project, Labrador, Canada metallurgical testwork, economic studies and process design

    Energy Technology Data Exchange (ETDEWEB)

    Goode, J.R., E-mail: jrgoode@sympatico.ca [Aurora Energy Resources Inc., Toronto, ON (Canada); Brown, J.A. [SGS Mineral Services, Lakefield, ON (Canada)

    2010-07-01

    Aurora Energy Resources Inc. is proposing to build and operate a 10,000 t/d process plant to produce 97 million pounds of U{sub 3}O{sub 8} over a seventeen-year project life from deposits in coastal Labrador. This paper summarizes the testwork, generally done by SGS Mineral Services in Lakefield, Ontario, and the economic studies that support flowsheet selection. The selected flowsheet includes SAG and ball milling, acid leaching using air/SO{sub 2} as an oxidant, and resin-in-pulp (RIP) extraction of uranium from the leached slurry. Other unit operations examined include ore sorting, heap leaching, liquid-solid separation, solvent extraction, and nanofiltration for eluate upgrading. We also review the extensive programs of environmental testwork and studies that were completed. (author)

  10. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  11. Process engineering considerations in the design of the water treatment plant for the Rum Jungle rehabilitation project

    International Nuclear Information System (INIS)

    Ackland, M.C.

    1983-01-01

    The Rum Jungle rehabilitation programme includes the treatment of around 4 million cubic metres of water that has been polluted by previous treatment operations and acidic seepage containing heavy metal salts from slowly oxidising overburden dumps. The water to be treated is of low pH and contains high sulphate levels. Project rehabilitation criteria and the basic chemistry of metal salts in solution were considered in arriving at the final process design. In order to achieve a cost effective plant design, the process was translated into a flow sheet that used unit operations that are more typical of the extractive metallurgical than the traditional water treatment industry. Consideration of the unit operations and the operating aspects of the plant are discussed

  12. A Design-Based Research Project on Information Literacy Focusing on Process, Reflections and Self-Feedback

    Directory of Open Access Journals (Sweden)

    Majbritt Ursula Johansen

    2016-12-01

    Full Text Available Many curriculums assume that the new generation of students are digital natives and information literate. However, studies show that this is not often the case. From these studies and our own experiences working with multidisciplinary students in the Health Sciences we found that students were not as information literate as required in the curriculum. Using Design Based Research as a method (following the four phases below, we developed a new information search process and a web-based tool with feedback opportunities from teachers and librarians in order to qualify the students competencies. Problem identification: Despite earlier initiatives from library and department, the students didn’t achieve higher levels of information literacy. Prototyping: Requirements and educational material were merged and tested while gathering feedback. Iterations: The prototype and feedback were evaluated and developed into a new information search process, which was tested and evaluated. Reflection and generalization: Initiative was taken to develope a web-based application visualizing the steps with the learning points: self-feedback, peer-feedback and counselor feedback. The result of the project is a new information search process model and a web-based learning environment called B!NKO 2.0. The evaluations have shown positive feedback on both the process and the web tool. The project has opened up new possibilities that go beyond the Health multidisciplinary students. A new project concerning the Humanities and Social Sciences is incipient. In this project new functionalities are also expected. B!NKO 2.0 has to a great extent shown its worth to help Health multidisciplinary students to get a deeper understanding of information literacy, and how to develop and change searches to get better results. B!NKO 2.0 has also given a positive "side effect” on the librarians work. Time spend on the "Book a Librarian” service have decreased for the librarians using

  13. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  14. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  15. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  16. The Use of Computer Tools in the Design Process of Students’ Architectural Projects. Case Studies in Algeria

    Science.gov (United States)

    Saighi, Ouafa; Salah Zerouala, Mohamed

    2017-12-01

    This The paper particularly deals with the way in which computer tools are used by students in their design studio’s projects. Four institutions of architecture education in Algeria are considered as a case study to evaluate the impact of such tools on student design process. This aims to inspect in depth such use, to sort out its advantages and shortcomings in order to suggest some solutions. A field survey was undertaken on a sample of students and their teachers at the same institutions. The analysed results mainly show that computer tools are highly focusing on improving the quality of drawings representation and images seeking observers’ satisfaction hence influencing their decision. Some teachers are not very keen to overuse the computer during the design phase; they prefer the “traditional” approach. This is the present situation that Algerian university is facing which leads to conflict and disagreement between students and teachers. Meanwhile, there was no doubt that computer tools have effectively contributed to improve the competitive level among students.

  17. Implementation of an innovative teaching project in a Chemical Process Design course at the University of Cantabria, Spain

    Science.gov (United States)

    Galan, Berta; Muñoz, Iciar; Viguri, Javier R.

    2016-09-01

    This paper shows the planning, the teaching activities and the evaluation of the learning and teaching process implemented in the Chemical Process Design course at the University of Cantabria, Spain. Educational methods to address the knowledge, skills and attitudes that students who complete the course are expected to acquire are proposed and discussed. Undergraduate and graduate engineers' perceptions of the methodology used are evaluated by means of a questionnaire. Results of the teaching activities and the strengths and weaknesses of the proposed case study are discussed in relation to the course characteristics. The findings of the empirical evaluation shows that the excessive time students had to dedicate to the case study project and dealing with limited information are the most negative aspects obtained, whereas an increase in the students' self-confidence and the practical application of the methodology are the most positive aspects. Finally, improvements are discussed in order to extend the application of the methodology to other courses offered as part of the chemical engineering degree.

  18. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... and the Aarhus School of Business, University of Aarhus, Denmark. The analysis demonstrates the potential of knowledge communication concepts for social technical design and highlights the cultural context of the designers as a key factor to consider in socio-technical design....

  19. ECO DESIGN IN DESIGN PROCESS

    Directory of Open Access Journals (Sweden)

    PRALEA Jeni

    2014-05-01

    Full Text Available Eco-design is a new domain, required by the new trends and existing concerns worldwide, generated by the necessity of adopting new design principles. New design principles require the designer to provide a friendly relationship between concept created, environment and consume. This "friendly" relationship should be valid both at present and in the future, generating new opportunities for product, product components or materials from which it was made. Awareness, by the designer, the importance of this new trend, permits the establishment of concepts that have as their objective the protection of present values and ensuring the legacy of future generations. Ecodesig, by its principles, is involved in the design process, from early stage, the stage of product design. Priority objective of the designers will consist in reducing the negative effects on the environment through the entire life cycle and after it is taken out of use. The main aspects of the eco-design will consider extending product exploitation, make better use of materials, reduction of emission of waste. The design process in the "eco"domein must be started by selecting the function of the concept, materials and technological processes, causing the shape of macro and micro geometric of the product through an analysis that involves optimizing and streamlining the product. This paper presents the design process of a cross-sports footwear concept, built on the basis of the principles of ecodesign

  20. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    between knowledge and technology through knowledge communication processes, cultural and rhetorical contexts. This connection is examined from a process point of view through the development of project goals and objectives to situate technology. The data comes from a Project Management course in which...... the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...... the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication. Keywords: Knowledge Communication, Knowledge Management, Socio-Technical Design, Project Management....

  1. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... networks at the project level or in studying the social networks that deliver the “actual information flow”. In this paper we propose and empirically test a model and method that integrates both social and activity networks into one compact representation, allowing to compare actual and required...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  2. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  3. Empowerment in the process of health messaging for rural low-income mothers: an exploratory message design project.

    Science.gov (United States)

    Aldoory, Linda; Braun, Bonnie; Maring, Elisabeth Fost; Duggal, Mili; Briones, Rowena Lynn

    2015-01-01

    Rural, low-income mothers face challenges to their health equal to or greater than those of low-income mothers from urban areas. This study put health message design into the hands of low-income rural mothers. The current study filled a research gap by analyzing a participatory process used to design health messages tailored to the everyday lives of rural low-income mothers. A total of forty-three mothers participated in nine focus groups, which were held from 2012 to 2013, in eight states. The mothers were from different racial and ethnic backgrounds. Participants discussed food security, physical activity, and oral health information. They created messages by considering several elements: visuals, length of message, voice/perspective, self-efficacy and personal control, emotional appeals, positive and negative reinforcements, and steps to health behavior change. This study was innovative in its focus on empowerment as a key process to health message design.

  4. Landscape and participation: construction of a PhD research problem and an analysis method. Towards the comparative analysis of participatory processes of landscape management projects design on a local scale in the Walloon region (Belgium)

    OpenAIRE

    Droeven, Emilie

    2007-01-01

    A preliminary reflection to the definition of a PhD research problem on the concepts of participation, landscape and project, led the student to be interested in the participatory processes of landscape management projects design, and in the inhabitants landscapes representations. The method includes the comparative analysis of local processes of projects design, and the direct observation of two Walloon landscape management projects design (investigation conducted with stakeholders implied i...

  5. The Critical Design Process

    DEFF Research Database (Denmark)

    Brunsgaard, Camilla; Knudstrup, Mary-Ann; Heiselberg, Per

    2014-01-01

    within Danish tradition of architecture and construction. The objective of the research presented in this paper, is to compare the different design processes behind the making of passive houses in a Danish context. We evaluated the process with regard to the integrated and traditional design process....... Data analysis showed that the majority of the consortiums worked in an integrated manner; though there was room for improvment. Additionally, the paper discusses the challanges of implementing the integrated design process in practice and suggests ways of overcomming some of the barriers . In doing so...

  6. Decoding designers' inspiration process

    NARCIS (Netherlands)

    Gonçalves, M.

    2016-01-01

    Every great invention, innovative design or visionary art piece ever created started in the same way: with a blank canvas. However, you never begin a new project with a completely clean slate: besides memories, past experiences and general knowledge, all of us are constantly surrounded by

  7. Video processing project

    CSIR Research Space (South Africa)

    Globisch, R

    2009-03-01

    Full Text Available Video processing source code for algorithms and tools used in software media pipelines (e.g. image scalers, colour converters, etc.) The currently available source code is written in C++ with their associated libraries and DirectShow- Filters....

  8. EPRI waste processing projects

    International Nuclear Information System (INIS)

    Shaw, R.A.

    1987-01-01

    The Electric Power Research Institute (EPRI) manages research for its sponsoring electric utilities in the United States. Research in the area of low level radioactive waste (LLRW) from light water reactors focuses primarily on waste processing within the nuclear power plants, monitoring of the waste packages, and assessments of disposal technologies. Accompanying these areas and complimentary to them is the determination and evaluation of the sources of nuclear power plants radioactive waste. This paper focuses on source characterization of nuclear power plant waste, LLRW processing within nuclear power plants, and the monitoring of these wastes. EPRI's work in waste disposal technology is described in another paper in this proceeding by the same author. 1 reference, 5 figures

  9. Behavioural design: A process for integrating behaviour change and design

    DEFF Research Database (Denmark)

    Cash, Philip; Hartlev, Charlotte Gram; Durazo, Christine Boysen

    2017-01-01

    Nudge, persuasion, and the influencing of human behaviour through design are increasingly important topics in design research and in the wider public consciousness. However, current theoretical approaches to behaviour change have yet to be operationalized this in design process support....... Specifically, there are few empirically grounded processes supporting designers in realising behaviour change projects. In response to this, 20 design projects from a case company are analysed in order to distil a core process for behavioural design. Results show a number of process stages and activities...... associated with project success, pointing to a new perspective on the traditional design process, and allowing designers to integrate key insights from behaviour change theory. Using this foundation we propose the Behavioural Design process....

  10. Process design and redesign

    NARCIS (Netherlands)

    Reijers, H.A.; Dumas, M.; Aalst, van der W.M.P.; Hofstede, ter A.H.M.

    2005-01-01

    This chapter aims to provide concrete guidance in redesigning business processes. Two alternative methods are described, both of them suitable to boost business performance. The first one is based on a collection of best practices, as applied in various redesign projects. These best practices all

  11. Investigating the Design Process

    DEFF Research Database (Denmark)

    Kautz, Karlheinz

    2011-01-01

    Purpose – This paper aims to explore a case of customer and user participation in an agile software development project, which produced a tailor-made information system for workplace support as a step towards a theory of participatory design in agile software development. Design....../methodology/approach – Based on an integrated framework for user participation derived from the participatory design literature the research was performed as a case study and semi-structured, open-ended interviews were conducted with about a third of the development team and with a representative sample of key players...... and with functional and democratic empowerment. The onsite customers played informative, consultative and participative roles. The analysis revealed that planning games, user stories and story cards, working software and acceptance tests structured the customer and user participation. This form of user participation...

  12. An Integrated Design Process

    DEFF Research Database (Denmark)

    Petersen, Mads Dines; Knudstrup, Mary-Ann

    2010-01-01

    Present paper is placed in the discussion about how sustainable measures are integrated in the design process by architectural offices. It presents results from interviews with four leading Danish architectural offices working with sustainable architecture and their experiences with it, as well...... as the requirements they meet in terms of how to approach the design process – especially focused on the early stages like a competition. The interviews focus on their experiences with working in multidisciplinary teams and using digital tools to support their work with sustainable issues. The interviews show...... the environmental measures cannot be discarded due to extra costs....

  13. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  14. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  15. CQI project improves discharge process.

    Science.gov (United States)

    1998-08-01

    At Gibson Rehab Center in Williamsport, PA, a continuous quality improvement project to bolster the institution's discharge planning process has resulted in increased satisfaction and an award for quality. The 15-month project was spearheaded by a multidisciplinary team charged with identifying areas that had a significant impact on customer service and suggesting better ways of delivering that service. Among the changes the group suggested were establishing a weekly discharge planning group for new neuro patients, assigning a discharge coordinator for each treatment team, and creating an interdisciplinary communication sheet for the home health therapy staff.

  16. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  17. Project X: Accelerator Reference Design

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, Stephen D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-06-20

    Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible

  18. "From the Formal to the Innovative": The Use of Case Studies and Sustainable Projects in Developing a Design Process Model for Educating Product/Industrial Designers

    Science.gov (United States)

    Oakes, G. L.; Felton, A. J.; Garner, K. B.

    2006-01-01

    The BSc in computer aided product design (CAPD) course at the University of Wolverhampton was conceived as a collaborative venture in 1989 between the School of Engineering and the School of Art and Design. The award was at the forefront of forging interdisciplinary collaboration at undergraduate level in the field of product design. It has…

  19. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  20. Implementing The Safeguards-By-Design Process

    International Nuclear Information System (INIS)

    Whitaker, J. Michael; McGinnis, Brent; Laughter, Mark D.; Morgan, Jim; Bjornard, Trond; Bean, Robert; Durst, Phillip; Hockert, John; DeMuth, Scott; Lockwood, Dunbar

    2010-01-01

    The Safeguards-by-Design (SBD) approach incorporates safeguards into the design and construction of nuclear facilities at the very beginning of the design process. It is a systematic and structured approach for fully integrating international and national safeguards for material control and accountability (MC and A), physical protection, and other proliferation barriers into the design and construction process for nuclear facilities. Implementing SBD is primarily a project management or project coordination challenge. This paper focuses specifically on the design process; the planning, definition, organization, coordination, scheduling and interaction of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project in order to provide the project context within which the safeguards design activities take place, describes the involvement of the safeguards experts in the design process, the nature of their analyses, interactions and decisions, and describes the documents created and how they are used. This report highlights the project context of safeguards activities, and identifies the safeguards community (nuclear facility operator, designer/builder, state regulator, SSAC and IAEA) must accomplish in order to implement SBD within the project.

  1. Plasma hearth process demonstration project

    International Nuclear Information System (INIS)

    Geimer, R.M.; Gillins, R.L.

    1995-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements

  2. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  3. The BioSCWG Project: Understanding the Trade-Offs in the Process and Thermal Design of Hydrogen and Synthetic Natural Gas Production

    Directory of Open Access Journals (Sweden)

    Mohamed Magdeldin

    2016-10-01

    Full Text Available This article presents a summary of the main findings from a collaborative research project between Aalto University in Finland and partner universities. A comparative process synthesis, modelling and thermal assessment was conducted for the production of Bio-synthetic natural gas (SNG and hydrogen from supercritical water refining of a lipid extracted algae feedstock integrated with onsite heat and power generation. The developed reactor models for product gas composition, yield and thermal demand were validated and showed conformity with reported experimental results, and the balance of plant units were designed based on established technologies or state-of-the-art pilot operations. The poly-generative cases illustrated the thermo-chemical constraints and design trade-offs presented by key process parameters such as plant organic throughput, supercritical water refining temperature, nature of desirable coproducts, downstream indirect production and heat recovery scenarios. The evaluated cases favoring hydrogen production at 5 wt. % solid content and 600 °C conversion temperature allowed higher gross syngas and CHP production. However, mainly due to the higher utility demands the net syngas production remained lower compared to the cases favoring BioSNG production. The latter case, at 450 °C reactor temperature, 18 wt. % solid content and presence of downstream indirect production recorded 66.5%, 66.2% and 57.2% energetic, fuel-equivalent and exergetic efficiencies respectively.

  4. Integrating ergonomic knowledge into engineering design processes

    DEFF Research Database (Denmark)

    Hall-Andersen, Lene Bjerg

    Integrating ergonomic knowledge into engineering design processes has been shown to contribute to healthy and effective designs of workplaces. However, it is also well-recognized that, in practice, ergonomists often have difficulties gaining access to and impacting engineering design processes...... employed in the same company, constituted a supporting factor for the possibilities to integrate ergonomic knowledge into the engineering design processes. However, the integration activities remained discrete and only happened in some of the design projects. A major barrier was related to the business...... to the ergonomic ambitions of the clients. The ergonomists’ ability to navigate, act strategically, and compromise on ergonomic inputs is also important in relation to having an impact in the engineering design processes. Familiarity with the engineering design terminology and the setup of design projects seems...

  5. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  6. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  7. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and

  8. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  9. Design Process-System and Methodology of Design Research

    Science.gov (United States)

    Bashier, Fathi

    2017-10-01

    Studies have recognized the failure of the traditional design approach both in practice and in the studio. They showed that design problems today are too complex for the traditional approach to cope with and reflected a new interest in a better quality design services in order to meet the challenges of our time. In the mid-1970s and early 1980s, there has been a significant shift in focus within the field of design research towards the aim of creating a ‘design discipline’. The problem, as will be discussed, is the lack of an integrated theory of design knowledge that can explicitly describe the design process in a coherent way. As a consequence, the traditional approach fails to operate systematically, in a disciplinary manner. Addressing this problem is the primary goal of the research study in the design process currently being conducted in the research-based master studio at Wollega University, Ethiopia. The research study seeks to make a contribution towards a disciplinary approach, through proper understanding the mechanism of knowledge development within design process systems. This is the task of the ‘theory of design knowledge’. In this article the research project is introduced, and a model of the design process-system is developed in the studio as a research plan and a tool of design research at the same time. Based on data drawn from students’ research projects, the theory of design knowledge is developed and empirically verified through the research project.

  10. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Conducting bench-scale tests to produce coke and acceptable tar from the process to satisfy Koppers, a prospective stakeholder; Consolidation of the project team players to execute the full size commercial cokemaking reactor demonstration; and Progress made in advancing the design of the full size commercial cokemaking reactor

  11. NASA Collaborative Design Processes

    Science.gov (United States)

    Jones, Davey

    2017-01-01

    This is Block 1, the first evolution of the world's most powerful and versatile rocket, the Space Launch System, built to return humans to the area around the moon. Eventually, larger and even more powerful and capable configurations will take astronauts and cargo to Mars. On the sides of the rocket are the twin solid rocket boosters that provide more than 75 percent during liftoff and burn for about two minutes, after which they are jettisoned, lightening the load for the rest of the space flight. Four RS-25 main engines provide thrust for the first stage of the rocket. These are the world's most reliable rocket engines. The core stage is the main body of the rocket and houses the fuel for the RS-25 engines, liquid hydrogen and liquid oxygen, and the avionics, or "brain" of the rocket. The core stage is all new and being manufactured at NASA's "rocket factory," Michoud Assembly Facility near New Orleans. The Launch Vehicle Stage Adapter, or LVSA, connects the core stage to the Interim Cryogenic Propulsion Stage. The Interim Cryogenic Propulsion Stage, or ICPS, uses one RL-10 rocket engine and will propel the Orion spacecraft on its deep-space journey after first-stage separation. Finally, the Orion human-rated spacecraft sits atop the massive Saturn V-sized launch vehicle. Managed out of Johnson Space Center in Houston, Orion is the first spacecraft in history capable of taking humans to multiple destinations within deep space. 2) Each element of the SLS utilizes collaborative design processes to achieve the incredible goal of sending human into deep space. Early phases are focused on feasibility and requirements development. Later phases are focused on detailed design, testing, and operations. There are 4 basic phases typically found in each phase of development.

  12. SUSTAINABLE AND DESIGN BUILDING PROCESSES

    Directory of Open Access Journals (Sweden)

    Silvio F. R. MOTTA

    2009-05-01

    Full Text Available The article presents a historical revision of the sustainable development and the sustainable in the constructed environment. It describes the main concepts and practices for implantation of the sustainable in the civil construction. These concepts and practices are reviewed from the perspective of the dialectic method, the general theory of systems and the theories of creative processes. These concepts are also analyzed from the perspective of quality management. The article proposes a model based on the dialectic, in which sustainability is considered an open system and a search inventive. The implantation of the sustainable in projects, companies and design processes are considered as main strategy. A vertical insertion of the sustainable in the process is proposal. In this vertical insertion, the sustainable is presents in all the phases and activities of the process. The model is organized to promote the external creative solutions to the process, through the promotion of research centers. Tools of selection of possibilities and practical are suggested, considering the characteristic dialectics proposals. The article concludes that sustainable is a cultural change in the processes, practical and management current.

  13. Designing with video focusing the user-centred design process

    CERN Document Server

    Ylirisku, Salu Pekka

    2007-01-01

    Digital video for user-centered co-design is an emerging field of design, gaining increasing interest in both industry and academia. It merges the techniques and approaches of design ethnography, participatory design, interaction analysis, scenario-based design, and usability studies. This book covers the complete user-centered design project. It illustrates in detail how digital video can be utilized throughout the design process, from early user studies to making sense of video content and envisioning the future with video scenarios to provoking change with video artifacts. The text includes

  14. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  15. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  16. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  17. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  18. NASA System Engineering Design Process

    Science.gov (United States)

    Roman, Jose

    2011-01-01

    This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.

  19. The Integrated Design Process (IDP)

    DEFF Research Database (Denmark)

    Hansen, Hanne Tine Ring; Knudstrup, Mary-Ann

    2005-01-01

    the different parameters and products can interact, and which consequences this would have on a project. The IDP does not ensure aesthetic or sustainable solutions, but it enables the designer to control the many parameters that must be considered and integrated in the project when creating more holistic...

  20. REVERSING THE CO-DESIGN PROCESS

    DEFF Research Database (Denmark)

    Lundsgaard, Christina

    2011-01-01

    a traditional codesign process the POE looks back on the process in order to adjust or redesign the building. The paper argues that co-design tools can be an instrument to make architects and other stakeholders reflect on the project once again in order to see it from a different perspective....

  1. BENCHPAR PROJECT. How to Incorporate ThermaI-Hydro-Mechanical Coupled Processes into Performance Assessments and Design Studies for Radioactive Waste Disposal in Geological Formations. Guidance Document

    International Nuclear Information System (INIS)

    Stephansson, O.; Andersson, Johan

    2005-02-01

    The objective of this Guidance Document is to provide advice on how to incorporate thermo-hydro-mechanical (THM) coupled processes into Performance Assessments (PAS) and design studies for radioactive waste disposal in geological formations to be experienced in a European context. The document has been generated by the EU research project BENCHPAR: Benchmark Tests and Guidance on Coupled Processes for Performance Assessment of Nuclear Waste Repositories. The document starts in Section 1 with an explanation of why numerical analyses incorporating THM mechanisms are required for radioactive waste studies and provides background material on the subject. Then, the THM processes and their interactions are explained in Section 2. Three case examples of THM numerical analysis are presented in Section 3 to illustrate the type of work that can be conducted to study the near-field, upscaling, and the far-field. For the three cases, there is discussion on the main findings, the relevance to a safety case, the relative importance of the different couplings, and the uncertainties involved. The importance and priority of the THM couplings are then summarized in Section 4. It is especially important to be able to technically audit the numerical analyses in order to establish that all the relevant variables, parameters and mechanisms have been included in the modelling and hence that the numerical model adequately represents the rock and engineering reality. Accordingly, recommended soft and hard auditing procedures are presented in Section 5. In this Guidance Document, we emphasize especially that the most important step in numerical modelling is not executing the calculations per se, but the earlier conceptualization of the problem regarding the dominant processes, the material properties and parameters, the engineering perturbations, and their mathematical presentations. The associated modelling component of addressing the uncertainties and estimating their influence on the

  2. Creativity Processes of Students in the Design Studio

    Science.gov (United States)

    Huber, Amy Mattingly; Leigh, Katharine E.; Tremblay, Kenneth R., Jr.

    2012-01-01

    The creative process is a multifaceted and dynamic path of thinking required to execute a project in design-based disciplines. The goal of this research was to test a model outlining the creative design process by investigating student experiences in a design project assignment. The study used an exploratory design to collect data from student…

  3. Design and Co-design of Project-organized Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Andreasen, Lars Birch

    2014-01-01

    The chapter contributes to discussions on design processes in relation to education, presenting different notions of design research and demonstrating how professors and students are involved together in designing innovative and constructive study processes that can help foster students' engagement...

  4. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  5. Low Achieving Eighth Graders Learn to Crack Word Problems: A Design Research Project for Aligning a Strategic Scaffolding Tool to Students' Mental Processes

    Science.gov (United States)

    Prediger, Susanne; Krägeloh, Nadine

    2015-01-01

    Topic-specific didactical design research provides means not only to investigate how to learn but also what to learn, i.e., for specifying learning contents by analyzing students' comprehension processes in detail. This important characteristic of didactical design research is exemplarily shown for students' difficulties in finding symbolic…

  6. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    Science.gov (United States)

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  7. Sustainable Smart Grid Project Design

    International Nuclear Information System (INIS)

    Szabo, I.

    2014-01-01

    Living together with the SG project generation issues in the last years a significant conclusion revealed from the unknown universe. Technology is not the missing condition for a real-time working country-wide SG power system realization. Technologies are developed, and 'SG-ready'. Engineering society is waiting for the signal to jump till the Moon or even farther. There are technical discussions about SG technologies. All there are marginal (ie. network safety issues, metering issues, electromobility etc.) and projects are mostly targeting the industrial players which obviously want to sell their utmost technologies taking generally not into consideration the overall social interests. The most anticipated question is: Who owns the social responsibility of the future (and as a part of it) its contemporary electric power utility system's responsibility? What should happen in order to start real development of 21st century's power system? How to open eyes of decision makers and energy institutions? Are these auxiliary SG projects natural evolution of the final solutions and systems? (author).

  8. Design processes of a citizen inquiry community

    OpenAIRE

    Aristeidou, Maria; Scanlon, Eileen; Sharples, Mike

    2017-01-01

    As with other online communities, it is important to design elements of citizen inquiry projects that will attract and engage members. This chapter describes the process of designing an online community for citizen inquiry. It builds on design principles of inquiry learning, citizen inquiry and other online communities. The ‘Weather-it’ citizen inquiry community is intended to engage and support people in initiating and joining sustainable citizen-led investigations. The findings indicate som...

  9. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    experiences and expertise to guide the students’ decisions in relation to the design project. This paper focuses on project supervision in the context of design education – and more specifically on how this supervision is unfolded in a Problem Based Learning culture. The paper explores the supervisor......’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop......In design there is a long tradition for apprenticeship, as well as tradition for learning through design projects. Today many design educations are positioned within the University context, and have to be aligned with the learning culture and structure, which they represent. This raises a specific...

  10. UMTRA project: Canonsburg final design

    International Nuclear Information System (INIS)

    Thiers, G.R.; Guros, F.B.; Smith, E.S.

    1984-01-01

    Final design for on-site stabilization of over 300,000 cubic yards of abandoned mill tailings in Canonsburg, Pennsylvania, is being completed this Fall. This paper describes design criteria, design procedures, and difficulties encountered for the following required elements: 1. Encapsulation cell; 2. Durability of erosion protection material; 3. Flood control berm; 4. Sedimentation pond; 5. Wastewater treatment plant. The 70,000 cubic yards of the tailings for which radiation levels exceed 100 picocuries per gram will be placed on a 2-ft-thick compacted clay liner and encased by a 3-ft-thick compacted clay cover. The remaining tailings will be covered with at least two feet of clay to prevent radon escape and to reduce rainfall infiltration. Erosion protection will be provided for the encapsulation cell, the drainage swales, and from potential meandering of nearby Chartiers Creek

  11. Calderon cokemaking process/demonstration project

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the project team-players; Recruiting Koppers Industries as an additional stakeholder; Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and Further progress made in the design of the commercial coking reactor

  12. Assessment and Development of Engineering Design Processes

    DEFF Research Database (Denmark)

    Ulrikkeholm, Jeppe Bjerrum

    , the engineering companies need to have efficient engineering design processes in place, so they can design customised product variants faster and more efficiently. It is however not an easy task to model and develop such processes. To conduct engineering design is often a highly iterative, illdefined and complex...... the process can be fully understood and eventually improved. Taking its starting point in this proposition, the outcome of the research is an operational 5-phased procedure for assessing and developing engineering design processes through integrated modelling of product and process, designated IPPM......, and eventually the results are discussed, overall conclusions are made and future research is proposed. The results produced throughout the research project are developed in close collaboration with the Marine Low Speed business unit within the company MAN Diesel & Turbo. The business unit is the world market...

  13. Teaching Process Design through Integrated Process Synthesis

    Science.gov (United States)

    Metzger, Matthew J.; Glasser, Benjamin J.; Patel, Bilal; Hildebrandt, Diane; Glasser, David

    2012-01-01

    The design course is an integral part of chemical engineering education. A novel approach to the design course was recently introduced at the University of the Witwatersrand, Johannesburg, South Africa. The course aimed to introduce students to systematic tools and techniques for setting and evaluating performance targets for processes, as well as…

  14. Managing Constraint Generators in Retail Design Processes

    DEFF Research Database (Denmark)

    Münster, Mia Borch; Haug, Anders

    case studies of fashion store design projects, the present paper addresses this gap. The and six case studies of fashion store design projects, the present paper sheds light on the types of constraints generated by the relevant constraint generators. The paper shows that in the cases studied......Retail design concepts are complex designs meeting functional and aesthetic demands. During a design process a retail designer has to consider various constraint generators such as stakeholder interests, physical limitations and restrictions. Obviously the architectural site, legislators...... and landlords need to be considered as well as the interest of the client and brand owner. Furthermore the users need to be taken into account in order to develop an interesting and functional shopping and working environments. Finally, suppliers and competitors may influence the design with regard...

  15. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  16. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  17. Visualizing Practices in Project-based Design

    DEFF Research Database (Denmark)

    Whyte, Jennifer; Tryggestad, Kjell; Comi, Alice

    2016-01-01

    Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed t...... representations enabled participants in project-based design to develop and share understanding. The complexity of projects and their distributed and mediated nature makes this approach timely and important in addressing new research questions and practical challenges.......Project-based design involves a variety of visual representations, which are evolved to make decisions and accomplish project objectives. Yet, such mediated and distributed ways of working are difficult to capture through ethnographies that examine situated design. A novel approach is developed...... of situated design. This allows the researcher to be nimble, tracing connections across complex engineering projects; reconstructing practices through their visual representations; and observing their effects. Second, it articulates how, in these empirical cases, interaction with a cascade of visual...

  18. Materials in Participatory Design Processes

    DEFF Research Database (Denmark)

    Hansen, Nicolai Brodersen

    This dissertation presents three years of academic inquiry into the question of what role materials play in interaction design and participatory design processes. The dissertation aims at developing conceptual tools, based on Deweys pragmatism, for understanding how materials aid design reflection....... It has been developed using a research-through-design approach in which the author has conducted practical design work in order to investigate and experiment with using materials to scaffold design inquiry. The results of the PhD work is submitted as seven separate papers, submitted to esteemed journals...... and conferences within the field of interaction design and HCI. The work is motivated both by the growing interest in materials in interaction design and HCI and the interest in design processes and collaboration within those fields. At the core of the dissertation lies an interest in the many different materials...

  19. Knowledge and Processes in Design. DPS Final Report.

    Science.gov (United States)

    Pirolli, Peter

    Four papers from a project concerning information-processing characterizations of the knowledge and processes involved in design are presented. The project collected and analyzed verbal protocols from instructional designers, architects, and mechanical engineers. A framework was developed for characterizing the problem spaces of design that…

  20. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  1. Systematic design for trait introgression projects.

    Science.gov (United States)

    Cameron, John N; Han, Ye; Wang, Lizhi; Beavis, William D

    2017-10-01

    Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into Pareto optimality plots associated with any arbitrary selection strategy. The Pareto plots can be used to make rational decisions concerning the trade-offs between maximizing the probability of success while minimizing costs and time. The systematic rigor associated with a cost, time and probability of success (CTP) framework is well suited to designing TI projects that require dynamic decision making. The CTP framework also revealed that previously identified 'best' strategies can be improved to be at least twice as effective without increasing time or expenses.

  2. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  3. Various advanced design projects promoting engineering education

    Science.gov (United States)

    1994-01-01

    The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

  4. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  5. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  6. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  7. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  8. Chip Design Process Optimization Based on Design Quality Assessment

    Science.gov (United States)

    Häusler, Stefan; Blaschke, Jana; Sebeke, Christian; Rosenstiel, Wolfgang; Hahn, Axel

    2010-06-01

    Nowadays, the managing of product development projects is increasingly challenging. Especially the IC design of ASICs with both analog and digital components (mixed-signal design) is becoming more and more complex, while the time-to-market window narrows at the same time. Still, high quality standards must be fulfilled. Projects and their status are becoming less transparent due to this complexity. This makes the planning and execution of projects rather difficult. Therefore, there is a need for efficient project control. A main challenge is the objective evaluation of the current development status. Are all requirements successfully verified? Are all intermediate goals achieved? Companies often develop special solutions that are not reusable in other projects. This makes the quality measurement process itself less efficient and produces too much overhead. The method proposed in this paper is a contribution to solve these issues. It is applied at a German design house for analog mixed-signal IC design. This paper presents the results of a case study and introduces an optimized project scheduling on the basis of quality assessment results.

  9. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  10. Process of establishing JHP project

    International Nuclear Information System (INIS)

    Ishihara, Masayasu

    2013-01-01

    Institute for Nuclear Study, University of Tokyo was a Japanese central research institute as regards to nuclear physics, high energy physics, and cosmic ray physics. After the foundations of National Laboratory for High Energy Physics, KEK, and Institute for Cosmic Ray Research, University of Tokyo, in early 1970s, the nuclear physics community worked out so-called NUMATRON project, which involved building a large heavy-ion synchrotron. It was, however, not successful in competition with TRISTAN project which was proposed by KEK to build a 30 GeV electron-positron collider. Alternative project of the nuclear physics community was so-called JHP (Japanese Hadron Project), to build 1 GeV proton linac in KEK site in collaboration with KEK, which included that the Institute for Nuclear Study should be consolidated to KEK leaving from The University of Tokyo. The reorganized KEK proposed in collaboration with JAEA, Japan Atomic Energy Agency, to build a big proton accelerator facility in JAEA site. This plan was realized as J-PARC, Japanese Proton Accelerator Research Complex, operating 50 GeV proton synchrotron. (author)

  11. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  12. THORP - the management of the design process

    International Nuclear Information System (INIS)

    Thorpe, E.; Thurrell, B.H.; Varey, L.S.

    1991-01-01

    This Paper sets out to describe the organization of the design of the Thermal Oxide Reprocessing Plant (THORP) head end and chemical separation building. This posed many challenges not only because the building itself is a complicated engineering entity, but also because of the logistical aspects of administering the large number of engineers and draughtsmen -600 in total at peak- employed on the project. The effects of the necessary iterative design process, both technical and logistical, are outlined, together with a description of the manner in which the whole design process was managed. (author)

  13. Learning from participatory design projects across industries

    DEFF Research Database (Denmark)

    Broberg, Ole; Souza da Conceição, Carolina

    2017-01-01

    Summative Statement: A preliminary framework for participatory design projects (PDP) was developed based on a retrospective analysis of five PDPs across different industries. The framework may serve as a guidance for planning and conducting PDPs. Problem statement: A growing number of experiences...... with participatory design or participatory ergonomics projects have been gained within the field of macro-ergonomics. It is suggested that the Participatory Ergonomics Framework (PEF) validated by Haines et al. (2002) needs to be updated based on these experiences and hence more focussed on design activities....... Research Objective / Question: The objective of this study was to update and design-orient the PEF based on experiences with PDPs within the last ten years. Methodology: Five participatory design projects across different industries were systematically analyzed and compared in order to develop a framework...

  14. Daylighting as the Driving Force of the Design Process: from the Results of a Survey to the Implementation into an Advanced Daylighting Project

    Directory of Open Access Journals (Sweden)

    Valerio R.M. Lo Verso

    2014-12-01

    Full Text Available This paper presents a study for the transformation of an industrial area in Turin, Italy. The area hosts two buildings (one of which appointed as listed to be transformed into dwellings. A synergic approach was adopted which combined expertise from architecture, social-economics, psychology and building physics sciences. Building physics sciences lead the research team. A user-centered design was pursued, using a bottom-up approach. A specifically developed questionnaire was submitted on-line to potential users. The survey showed that ‘amount of daylight’, ‘size of rooms’, ‘tranquility of the area’ and ‘presence of a private garden’ were perceived by users to be the most positive aspects of both their present and future, ideal home. These results were then implemented into the project. The exploitation of daylight became the driving force of the transformation project. Especially for the listed building, skylights and light wells were designed to bring daylight into the cores of the buildings, which host common spaces such as libraries or study rooms. The amount of daylight was assessed through the legislative index of the average daylight factor and through a climate-based modeling approach, calculating dynamic metrics such as the spatial daylight autonomy and the Useful Daylight Illuminance. The paper critically compares and discusses these two approaches. Finally, the energy demand for lighting was also calculated to analyze how the increased exploitation of daylight may imply a reduced need for electricity for lighting.

  15. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  16. The Design of Project Management Structural Organization

    OpenAIRE

    Dumitru Constantinescu; Cristian Etegan

    2007-01-01

    The relationships organization-suppliers-customers have recently known major changes in the structure of services and have made the organization develop its managerial and professional competencies in order to do projects. The qualified organization is the most trust-worthy in the process of doing a project. The participation of an organization in doing projects depends on a multitude of factors. Out of these factors, the structural organization comes forth, as it represents the variable with...

  17. Integrated project delivery : The designer as integrator

    NARCIS (Netherlands)

    Wamelink, J.W.F.; Koolwijk, J.S.J.; van Doorn, A.J.

    2012-01-01

    Process innovation related to integrated project delivery is an important topic in the building industry. Studies on process innovation through the use of integrated contracts usually focus on contractors, and particularly on the possibility of forward integration into the building process. Three

  18. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  19. Capstone Engineering Design Projects for Community Colleges

    Science.gov (United States)

    Walz, Kenneth A.; Christian, Jon R.

    2017-01-01

    Capstone engineering design courses have been a feature at research universities and four-year schools for many years. Although such classes are less common at two-year colleges, the experience is equally beneficial for this population of students. With this in mind, Madison College introduced a project-based Engineering Design course in 2007.…

  20. Design and optimization of food processing conditions

    OpenAIRE

    Silva, C. L. M.

    1996-01-01

    The main research objectives of the group are the design and optimization of food processing conditions. Most of the work already developed is on the use of mathematical modeling of transport phenomena and quantification of degradation kinetics as two tools to optimize the final quality of thermally processed food products. Recently, we initiated a project with the main goal of studying the effects of freezing and frozen storage on orange and melon juice pectinesterase activity and q...

  1. Process design (exterior – interior design)

    OpenAIRE

    Sandeva, Vaska; Despot, Katerina

    2013-01-01

    The design is a complex process of spatial organization and creative problem object. It switched to the study of complex natural conditions (analysis and evaluation) and the development of compositional solution structure of the object. Construction and shaping of all buildings whether it is exterior or interior, be it street, Square apartment building, park or greater forest massif, public facility (administrative buildings, hospitals, schools, galleries etc.), residential object (garsion...

  2. Documenting the Engineering Design Process

    Science.gov (United States)

    Hollers, Brent

    2017-01-01

    Documentation of ideas and the engineering design process is a critical, daily component of a professional engineer's job. While patent protection is often cited as the primary rationale for documentation, it can also benefit the engineer, the team, company, and stakeholders through creating a more rigorously designed and purposeful solution.…

  3. Design of object processing systems

    NARCIS (Netherlands)

    Grigoras, D.R.; Hoede, C.

    Object processing systems are met rather often in every day life, in industry, tourism, commerce, etc. When designing such a system, many problems can be posed and considered, depending on the scope and purpose of design. We give here a general approach which involves graph theory, and which can

  4. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  5. Design of plutonium processing facilities

    International Nuclear Information System (INIS)

    Derbyshire, W.; Sills, R.J.

    1982-01-01

    Five considerations for the design of plutonium processing facilities are identified. These are: Toxicity, Radiation, Criticality, Containment and Remote Operation. They are examined with reference to reprocessing spent nuclear fuel and application is detailed both for liquid and dry processes. (author)

  6. IV&V Project Assessment Process Validation

    Science.gov (United States)

    Driskell, Stephen

    2012-01-01

    The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

  7. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  8. Improving design processes through structured reflection : a prototype software tool

    OpenAIRE

    Reymen, I.M.M.J.; Melby, E.

    2001-01-01

    A prototype software tool facilitating the use of a design method supporting structured reflection on design processes is presented. The prototype, called Echo, has been developed to explore the benefits of using a software system to facilitate the use of the design method. Both the prototype software tool and the design method are developed as part of the Ph.D. project of Isabelle Reymen. The goal of the design method is supporting designers with reflection on design processes in a systemati...

  9. Core designs of modern VVER projects

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kushmanov, S.; Vjalitsyn, V.; Vasilchenko, R.

    2015-01-01

    The presented operational experience of TVS - 2M (pilot-commercial operation started in 2006 at Balakovo NPP -1) enables to use it as reference for new projects because of similarity in designs and operational conditions. In the paper main parameters of fuel cycles, stability to impact of damaging factors, pilot operation of MG, new alloys, ADF and NTMC, upgrade of FA - 2M for the further power uprating, profiling of Gd-fuel rods for 18-month Fuel Cycle (FC) and perfection of absorber element design are the discussed issues. At the end author concluded that: 1) Core designs of new projects AES-2006 and VVER-TOI are based on extensive successful operational experience of the close prototype of TVS - 2M. 2) All improvements both of technical and economic parameters of fuel are subjected to representative examination by pilot operation at the power units with VVER-1000 being close prototypes of new designs

  10. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  11. PROJECT ENGINEERING DATA MANAGEMENT AT AUTOMATED PREPARATION OF DESIGN DOCUMENTATION

    Directory of Open Access Journals (Sweden)

    A. V. Guryanov

    2017-01-01

    Full Text Available We have developed and realized instrumental means for automated support of end-to-end design process for design documentation on a product at the programming level. The proposed decision is based on processing of the engineering project data that are contained in interdependent design documents: tactical technical characteristics of products, data on the valuable metals contained in them, the list of components applied in a product and others. Processing of engineering data is based on their conversion to the form provided by requirements of industry standards for design documentation preparation. The general graph of the design documentation developed on a product is provided. The description of the developed software product is given. Automated preparation process of interdependent design documents is shown on the example of preparation of purchased products list. Results of work can be used in case of research and development activities on creation of perspective samples of ADP equipment.

  12. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  13. Human Integration Design Processes (HIDP)

    Science.gov (United States)

    Boyer, Jennifer

    2014-01-01

    The purpose of the Human Integration Design Processes (HIDP) document is to provide human-systems integration design processes, including methodologies and best practices that NASA has used to meet human systems and human rating requirements for developing crewed spacecraft. HIDP content is framed around human-centered design methodologies and processes in support of human-system integration requirements and human rating. NASA-STD-3001, Space Flight Human-System Standard, is a two-volume set of National Aeronautics and Space Administration (NASA) Agency-level standards established by the Office of the Chief Health and Medical Officer, directed at minimizing health and performance risks for flight crews in human space flight programs. Volume 1 of NASA-STD-3001, Crew Health, sets standards for fitness for duty, space flight permissible exposure limits, permissible outcome limits, levels of medical care, medical diagnosis, intervention, treatment and care, and countermeasures. Volume 2 of NASASTD- 3001, Human Factors, Habitability, and Environmental Health, focuses on human physical and cognitive capabilities and limitations and defines standards for spacecraft (including orbiters, habitats, and suits), internal environments, facilities, payloads, and related equipment, hardware, and software with which the crew interfaces during space operations. The NASA Procedural Requirements (NPR) 8705.2B, Human-Rating Requirements for Space Systems, specifies the Agency's human-rating processes, procedures, and requirements. The HIDP was written to share NASA's knowledge of processes directed toward achieving human certification of a spacecraft through implementation of human-systems integration requirements. Although the HIDP speaks directly to implementation of NASA-STD-3001 and NPR 8705.2B requirements, the human-centered design, evaluation, and design processes described in this document can be applied to any set of human-systems requirements and are independent of reference

  14. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  15. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorus uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery levels which assure the project viability technicaly and economicaly. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  16. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorous uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery leves which assure the project viability technically and economically. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  17. A rural community's involvement in the design and usability testing of a computer-based informed consent process for the Personalized Medicine Research Project.

    Science.gov (United States)

    Mahnke, Andrea N; Plasek, Joseph M; Hoffman, David G; Partridge, Nathan S; Foth, Wendy S; Waudby, Carol J; Rasmussen, Luke V; McManus, Valerie D; McCarty, Catherine A

    2014-01-01

    Many informed consent studies demonstrate that research subjects poorly retain and understand information in written consent documents. Previous research in multimedia consent is mixed in terms of success for improving participants' understanding, satisfaction, and retention. This failure may be due to a lack of a community-centered design approach to building the interventions. The goal of this study was to gather information from the community to determine the best way to undertake the consent process. Community perceptions regarding different computer-based consenting approaches were evaluated, and a computer-based consent was developed and tested. A second goal was to evaluate whether participants make truly informed decisions to participate in research. Simulations of an informed consent process were videotaped to document the process. Focus groups were conducted to determine community attitudes towards a computer-based informed consent process. Hybrid focus groups were conducted to determine the most acceptable hardware device. Usability testing was conducted on a computer-based consent prototype using a touch-screen kiosk. Based on feedback, a computer-based consent was developed. Representative study participants were able to easily complete the consent, and all were able to correctly answer the comprehension check questions. Community involvement in developing a computer-based consent proved valuable for a population-based genetic study. These findings may translate to other types of informed consents, including those for trials involving treatment of genetic disorders. A computer-based consent may serve to better communicate consistent, clear, accurate, and complete information regarding the risks and benefits of study participation. Additional analysis is necessary to measure the level of comprehension of the check-question answers by larger numbers of participants. The next step will involve contacting participants to measure whether understanding of

  18. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  19. Leadership Behaviors In Project Design Offices

    OpenAIRE

    Kasapoğlu, Esin

    2011-01-01

    Leadership may be defined as the ability to collect a group of people around definite objectives and the achievement of said objectives. An architectural design team needs a leader, and in this paper, the owner of the office is the formal leader. Leadership behaviors of employer architects are directly related to the performance of the design team; therefore, effective leadership is key to a successful design process. Data were collected through a questionnaire on leadership behaviors that wa...

  20. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  1. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  2. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  3. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  4. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  5. Supplemental design requirements document, Project W026

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1993-01-01

    This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770

  6. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  7. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  8. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  9. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  10. THE GREEN RENOVATION AND EXPANSION OF THE AIKEN CENTER: A SUSTAINABLE GREEN BUILDING DESIGN, COLLABORATIVE PLANNING PROCESS AND LONG-TERM DEMONSTRATION AND RESEARCH PROJECT

    Science.gov (United States)

    One important outcome of this project will be the development of a long-term demonstration program that will provide teaching and research tools for many decades. In addition, we will develop models that will be available for others to use, present our findings to others, and ...

  11. Design criteria for Reedy Creek Demonstration Project

    International Nuclear Information System (INIS)

    Felicione, F.S.; Logan, J.A.

    1980-11-01

    This document defines the basic criteria for the 100-ton/day pilot plant which will use the Andco-Torrax pyrolysis process at Walt Disney World in Orlando, Florida, to produce hot water. The waste will simulate transuranic wastes which are stored at INEL. The Andco-Torrax process is designed to convert mixed municipal refuse into energy and is called slagging pyrolysis solid waste conversion

  12. Accumulating project management knowledge through process theory

    NARCIS (Netherlands)

    Niederman, Fred; March, Salvatore T.; Mueller, Benjamin

    2014-01-01

    This paper describes how the general notion of process theory can provide a foundational component in a portfolio of project management theories. The paper begins by outlining a variety of views pertaining to the nature of theory and theory development. This forms a basis for understanding how

  13. Flexible Processes in Project-Centred Learning

    NARCIS (Netherlands)

    Ceri, Stefano; Matera, Maristella; Raffio, Alessandro; Spoelstra, Howard

    2007-01-01

    Ceri, S., Matera, M., Raffio, A. & Spoelstra, H. (2007). Flexible Processes in Project-Centred Learning. In E. Duval, R. Klamma, and M. Wolpers (Eds.), European Conference on Technology Enhanced Learning, Lecture Notes in Computer Science, Vol. 4753, pp. 463-468. Berlin Heidelberg: Springer-Verlag

  14. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  15. Design fixation and cooperative learning in elementary engineering design project: A case study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  16. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    Carro, C.A.

    2010-01-01

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  17. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  18. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  19. Designing forestry projects for climate action plan implementation

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, R.N. [American Forests, Washington, DC (United States)

    1995-11-01

    Forests play an important role in sequestering and storing carbon in terrestrial ecosystems, so countries considering ways to mitigate greenhouse gas emissions are looking at forestry projects as one option. Designing forestry projects that accomplish desired goals is no simple task however, as many past failures attest. This paper proposes that, to be successful, climate change mitigation forestry projects need to: (a) feature other socially, economically and environmentally desirable goals as primary motivators; (b) be designed in cooperation with, and in the interests of, local populations, and (c), feature cooperative efforts between government, industry, and volunteer associations. Volunteer associations can often be assisted in being a more capable partner through an organizational training and support process, and this is one of the services offered to cooperating countries through American Forests. 21 refs.

  20. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  1. Management of Constraint Generators in Fashion Store Design Processes

    DEFF Research Database (Denmark)

    Borch Münster, Mia; Haug, Anders

    2017-01-01

    of the literature and eight case studies of fashion store design projects. Findings: The paper shows that the influence of the constraint generators decreases during the design process except for supplier-generated constraints, which increase in the final stages of the design process. The paper argues...... is on fashion store design, the findings may, to some degree, be applicable to other types of store design projects. Practical implications: The understandings provided by this paper may help designers to deal proactively with constraints, reducing the use of resources to alter design proposals. Originality......Purpose: Retail design concepts are complex designs meeting functional and aesthetic demands from various constraint generators. However, the literature on this topic is sparse and offers only little support for store designers to deal with such challenges. To address this issue, the purpose...

  2. Conceptual Chemical Process Design for Sustainability.

    Science.gov (United States)

    This chapter examines the sustainable design of chemical processes, with a focus on conceptual design, hierarchical and short-cut methods, and analyses of process sustainability for alternatives. The chapter describes a methodology for incorporating process sustainability analyse...

  3. The Plasma Hearth Process Technology Development Project

    International Nuclear Information System (INIS)

    Geimer, R.; Batdorf, J.; Wolfe, P.

    1993-01-01

    The US DOE Office of Technology Development (OTD) is currently evaluating the Plasma Hearth Process (PHP) for potential treatment of several DOE waste types. The PHP is a high-temperature vitrification process that has potential application for a wide range of mixed waste types in both the low-level and transuranic mixed waste categories. The PHP is being tested under both the OTD Mixed Waste Integrated Program and the Buried Waste Integrated Demonstration. Initial testing has been completed on several different surrogate waste forms that are representative of some of the DOE mixed waste streams. Destruction of organic material exceeds that of conventional incineration technologies. The vitrified residual has leaching characteristics comparable to glass formulations produced in the high-level waste program. The first phase of the PHP demonstration project has been successfully completed, and the project is currently beginning a comprehensive second phase of development and testing

  4. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  5. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  6. A test of a design process scale

    NARCIS (Netherlands)

    Marinakis, Yorgos; Harms, Rainer; Walsh, Steven Thomas

    2015-01-01

    Design is a type of innovation that focuses on creating new product and service meanings. Models of the design process are important because they can help firms manage their product and service design processes to obtain competitive advantage. Empirically-based models of the design process are

  7. Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook Nuclear Plant units 1 and 2

    International Nuclear Information System (INIS)

    Carruth, R.C.; Sotos, W.G.

    1996-01-01

    As the nation's nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant's protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade

  8. 34 CFR 637.13 - What are design projects?

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.13 What are design projects? (a) Design... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13...

  9. Expression regulation of design process gene in product design

    DEFF Research Database (Denmark)

    Li, Bo; Fang, Lusheng; Li, Bo

    2011-01-01

    To improve the design process efficiency, this paper proposes the principle and methodology that design process gene controls the characteristics of design process under the framework of design process reuse and optimization based on design process gene. First, the concept of design process gene...... is proposed and analyzed, as well as its three categories i.e., the operator gene, the structural gene and the regulator gene. Second, the trigger mechanism that design objectives and constraints trigger the operator gene is constructed. Third, the expression principle of structural gene is analyzed...... with the example of design management gene. Last, the regulation mode that the regulator gene regulates the expression of the structural gene is established and it is illustrated by taking the design process management gene as an example. © (2011) Trans Tech Publications....

  10. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Albert Calderon

    1999-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the team of stakeholders; Move the site for the commercial demonstration to LTV Steel, Cleveland, Ohio; Permitting for new site; Site specific engineering; Cost update of the project as it relates to the Cleveland location; FETC update; DCAA audit; and Updated endorsement of Calderon process by Ohio EPA and U.S. EPA, Region 5

  11. MIT/Draper Technology Development Partnership Project: Systems Analysis and On-Station Propulsion Subsystem Design

    National Research Council Canada - National Science Library

    Conklin, Theodore

    1998-01-01

    The objective of this thesis is to describe the process for, and the overall design that resulted from the MIT/Draper Project from August, 1996 to May, 1997, including the specific design of the on...

  12. Design Thinking in Elementary Students' Collaborative Lamp Designing Process

    Science.gov (United States)

    Kangas, Kaiju; Seitamaa-Hakkarainen, Pirita; Hakkarainen, Kai

    2013-01-01

    Design and Technology education is potentially a rich environment for successful learning, if the management of the whole design process is emphasised, and students' design thinking is promoted. The aim of the present study was to unfold the collaborative design process of one team of elementary students, in order to understand their multimodal…

  13. Finite volume method room acoustic simulations integrated into the architectural design process

    DEFF Research Database (Denmark)

    Pind Jörgensson, Finnur Kári; Jeong, Cheol-Ho; Engsig-Karup, Allan Peter

    2017-01-01

    with the architectural design from the earliest design stage, as a part of a holistic design process. A new procedure to integrate room acoustics into architectural design is being developed in a Ph.D. project, with the aim of promoting this early stage holistic design process. This project aims to develop a new hybrid...

  14. The Digital Design Process - Reflections on a Single Design Case

    NARCIS (Netherlands)

    Achten, H.H.; Joosen, G.; Dokonal, W.; Hirschberg, U.

    2003-01-01

    CAD tools are increasing their expressive and geometric power to enable a design process in which the computer model can be used throughout the whole design process for realizing the design. Such a process, in which other media such as physical scale models or drawings are no longer required by

  15. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  16. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  17. Design and Process Development of Thin-Ply Composites, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This project evaluates automated tape placement (ATP) processing of thin ply composites, including process and design modeling, test panel fabrication and mechanical...

  18. Calderon cokemaking process/demonstration project

    International Nuclear Information System (INIS)

    Albert Calderon

    1996-01-01

    This project which deals with the demonstration of a full size commercial coking retort using Calderon's proprietary technology for making metallurgical coke ran into a commercialization problem by virtue that the designed retort for two (2) tons of coke/hour necessitates thirty-two (32) retorts to produce the 500,000 tons of coke per year for a commercial plant. Bechtel Mining and Metals prepared a cost estimate of the commercial plant which indicated the commercial plant would not be economically feasible. The activity during this reporting period was directed to making changes to the design of the coking retort in order to reduce the number of retorts required for a 500,000 ton/year commercial coke facility. The result of this activity resulted in the drastic reduction of the number of retorts to eight (8) with each retort projected to produce 8.17 tons of coke/hour. Such decrease in number of retorts makes the Calderon technology quite competitive and therefore commercially feasible

  19. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  20. Project and Innovation Management in New Product Development Processes

    DEFF Research Database (Denmark)

    Henriksen, Leif; Gayretli, Ahmet

    2010-01-01

    Although the process of innovation is one of the most important drivers behind the growth and prosperity of today’s global economy, it is one of the least understood. This paper aims to address specific problems in carrying out new product development processes. There are crucial issues related...... to product design processes like inefficient project management, increasing product complexity, conflict management, shortfall of existing methods and tools, and high failures in new product introduction. A new approach has been proposed for a system based platform, which consist of a product platform...

  1. describing a collaborative clothing design process between

    African Journals Online (AJOL)

    user

    ISSN 0378-5254 Journal of Family Ecology and Consumer Sciences, Vol 43, 2015. Designing success: describing a ... PROCESS BETWEEN APPRENTICE DESIGNERS AND EXPERT DESIGN .... 5 Evaluation and decisions. (a) Outcomes.

  2. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  3. UMTRA Surface Project management action process document: Final. Revision 2

    International Nuclear Information System (INIS)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites

  4. UMTRA Surface Project management action process document: Final. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  5. Formal analysis of design process dynamics

    NARCIS (Netherlands)

    Bosse, T.; Jonker, C.M.; Treur, J.

    2010-01-01

    This paper presents a formal analysis of design process dynamics. Such a formal analysis is a prerequisite to come to a formal theory of design and for the development of automated support for the dynamics of design processes. The analysis was geared toward the identification of dynamic design

  6. Formal Analysis of Design Process Dynamics

    NARCIS (Netherlands)

    Bosse, T.; Jonker, C.M.; Treur, J.

    2010-01-01

    This paper presents a formal analysis of design process dynamics. Such a formal analysis is a prerequisite to come to a formal theory of design and for the development of automated support for the dynamics of design processes. The analysis was geared toward the identification of dynamic design

  7. Imperfect Information in Software Design Processes

    NARCIS (Netherlands)

    Noppen, J.A.R.

    2007-01-01

    The process of designing high-quality software systems is one of the major issues in software engineering research. Over the years, this has resulted in numerous design methods, each with specific qualities and drawbacks. For example, the Rational Unified Process is a comprehensive design process,

  8. Design Processes and Constructive Ergonomics

    DEFF Research Database (Denmark)

    Broberg, Ole

    2015-01-01

    This paper discusses some central issues in the concept of constructive ergonomics. It does so by reflecting on experiences from ergonomics intervention projects carried out in Denmark. Constructive ergonomics has a huge potential as a new way to go for ergonomics research and practice. However, ...

  9. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    Science.gov (United States)

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  10. Southeast Region Headboat Survey-PPS Survey Design Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset is a record of trips selected during pilot procedures for the PPS design project designed to track the port agents ability to follow the PPS design and...

  11. Reducing Design Cycle Time and Cost Through Process Resequencing

    Science.gov (United States)

    Rogers, James L.

    2004-01-01

    In today's competitive environment, companies are under enormous pressure to reduce the time and cost of their design cycle. One method for reducing both time and cost is to develop an understanding of the flow of the design processes and the effects of the iterative subcycles that are found in complex design projects. Once these aspects are understood, the design manager can make decisions that take advantage of decomposition, concurrent engineering, and parallel processing techniques to reduce the total time and the total cost of the design cycle. One software tool that can aid in this decision-making process is the Design Manager's Aid for Intelligent Decomposition (DeMAID). The DeMAID software minimizes the feedback couplings that create iterative subcycles, groups processes into iterative subcycles, and decomposes the subcycles into a hierarchical structure. The real benefits of producing the best design in the least time and at a minimum cost are obtained from sequencing the processes in the subcycles.

  12. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  13. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  14. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  15. Gaps in the Design Process

    Energy Technology Data Exchange (ETDEWEB)

    Veers, Paul

    2016-10-04

    The design of offshore wind plants is a relatively new field. The move into U.S. waters will have unique environmental conditions, as well as expectations from the authorities responsible for managing the development. Wind turbines are required to test their assumed design conditions with the site conditions of the plant. There are still some outstanding issues on how we can assure that the design for both the turbine and the foundation are appropriate for the site and will have an acceptable level of risk associated with the particular installation.

  16. Designing future learning. A posthumanist approach to researching design processes

    DEFF Research Database (Denmark)

    Juelskjær, Malou

    I investigate how a design process – leading up to the design of a new education building - enact, transform and highlight tacit everyday practices and experiences in an education setting, whereby becoming an art of managing. I apply a post-humanist performative perspective, highlighting entangled...... agencies rather than focusing on human agency. I focus on the design process rather than the designer. The design process accelerated and performed past and future experiences of schooling, learning, teaching. This called for analytical attention to agential forces of not only the material but also...... and temporalities matter in design processes. Furthermore, the analysis emphasise how design translate affective economies and that attention to those affective economies are vital for the result of the design process....

  17. Design Processes and Constructive Ergonomics

    OpenAIRE

    Broberg, Ole

    2015-01-01

    This paper discusses some central issues in the concept of constructive ergonomics. It does so by reflecting on experiences from ergonomics intervention projects carried out in Denmark. Constructive ergonomics has a huge potential as a new way to go for ergonomics research and practice. However, many challenges are to be overcome. They relate among others to education and training of ergonomist, and the cultural and institutional setting of ergonomics in specific countries.

  18. Ergonomics approaches to sociotechnical design processes

    DEFF Research Database (Denmark)

    Broberg, Ole

    2003-01-01

    A five-year design process of a continuous process wok has been studied with the aim of elucidating the conditions for integrating work environment aspects. The design process was seen as a network building activity and as a social shaping process of the artefact. A work environment log is sugges...

  19. External designers in product design processes of small manufacturing firms

    NARCIS (Netherlands)

    Berends, Hans; Reymen, Isabelle; Stultiëns, Rutger G L; Peutz, Murk

    Small manufacturing firms often fail to reap the benefits of good design practices. This study investigates how the involvement of external designers influences the evolution of product design processes in small manufacturing firms. Qualitative and quantitative process research methods were used to

  20. Process Variations and Probabilistic Integrated Circuit Design

    CERN Document Server

    Haase, Joachim

    2012-01-01

    Uncertainty in key parameters within a chip and between different chips in the deep sub micron era plays a more and more important role. As a result, manufacturing process spreads need to be considered during the design process.  Quantitative methodology is needed to ensure faultless functionality, despite existing process variations within given bounds, during product development.   This book presents the technological, physical, and mathematical fundamentals for a design paradigm shift, from a deterministic process to a probability-orientated design process for microelectronic circuits.  Readers will learn to evaluate the different sources of variations in the design flow in order to establish different design variants, while applying appropriate methods and tools to evaluate and optimize their design.  Trains IC designers to recognize problems caused by parameter variations during manufacturing and to choose the best methods available to mitigate these issues during the design process; Offers both qual...

  1. GIS Project Design: Brainstorming & Ideation Workshop

    OpenAIRE

    Garofalo, Frank

    2015-01-01

    Who should attend: Do you have a new project or existing project, and looking to generate some new ideas? Come with a project in mind or just come to learn some new collaboration and brainstorming techniques. What participants will learn… techniques for: Working with others to create a common direction and vision, then generating alignment Evaluating current state situations, strengths, complications and implications Identifying and forming consensus on key target audiences Generating ide...

  2. Defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.; Maher, R.; Mellen, J.B.; Shafranek, L.F.; Stevens, W.R. III.

    1984-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level waste at the Savannah River Plant near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes produced by defense activities at the site. At the present time engineering and design are 45% complete, the site has been cleared, and startup is expected in 1989. This paper will describe project status as well as features of the design. 9 figures

  3. SOLVING GLOBAL PROBLEMS USING COLLABORATIVE DESIGN PROCESSES

    DEFF Research Database (Denmark)

    Lenau, Torben Anker; Mejborn, Christina Okai

    2011-01-01

    In this paper we argue that use of collaborative design processes is a powerful means of bringing together different stakeholders and generating ideas in complex design situations. The collaborative design process was used in a workshop with international participants where the goal was to propos...

  4. Graphic Design in Libraries: A Conceptual Process

    Science.gov (United States)

    Ruiz, Miguel

    2014-01-01

    Providing successful library services requires efficient and effective communication with users; therefore, it is important that content creators who develop visual materials understand key components of design and, specifically, develop a holistic graphic design process. Graphic design, as a form of visual communication, is the process of…

  5. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  6. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  7. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  8. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  9. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  10. Hanford Waste Vitrification Plant - the project and process systems

    International Nuclear Information System (INIS)

    Swenson, L.D.; Miller, W.C.; Smith, R.A.

    1990-01-01

    The Hanford Waste Vitrification Plant (HWVP) project is scheduled to start construction on the Hanford reservation in southeastern Washington State in 1991. The project will immobilize the liquid high-level defense waste stored there. The HWVP represents the third phase of the U.S. Department of Energy (DOE) activities that are focused on the permanent disposal of high-level radioactive waste, building on the experience of Defense Waste Processing Facility (DWPF) at the Savannah River site, South Carolina, and of the West Valley Demonstration Plant (WVDP), New York. This sequential approach to disposal of the country's commercial and defense high-level radioactive waste allows HWVP to make extensive use of lessons learned from the experience of its predecessors, using mature designs from the earlier facilities to achieve economies in design and construction costs while enhancing operational effectiveness

  11. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  12. Information-Processing Models and Curriculum Design

    Science.gov (United States)

    Calfee, Robert C.

    1970-01-01

    "This paper consists of three sections--(a) the relation of theoretical analyses of learning to curriculum design, (b) the role of information-processing models in analyses of learning processes, and (c) selected examples of the application of information-processing models to curriculum design problems." (Author)

  13. Biomimetic design processes in architecture: morphogenetic and evolutionary computational design

    International Nuclear Information System (INIS)

    Menges, Achim

    2012-01-01

    Design computation has profound impact on architectural design methods. This paper explains how computational design enables the development of biomimetic design processes specific to architecture, and how they need to be significantly different from established biomimetic processes in engineering disciplines. The paper first explains the fundamental difference between computer-aided and computational design in architecture, as the understanding of this distinction is of critical importance for the research presented. Thereafter, the conceptual relation and possible transfer of principles from natural morphogenesis to design computation are introduced and the related developments of generative, feature-based, constraint-based, process-based and feedback-based computational design methods are presented. This morphogenetic design research is then related to exploratory evolutionary computation, followed by the presentation of two case studies focusing on the exemplary development of spatial envelope morphologies and urban block morphologies. (paper)

  14. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  15. The Health and Sport Engagement (HASE) Intervention and Evaluation Project: protocol for the design, outcome, process and economic evaluation of a complex community sport intervention to increase levels of physical activity.

    Science.gov (United States)

    Mansfield, Louise; Anokye, Nana; Fox-Rushby, Julia; Kay, Tess

    2015-10-26

    Sport is being promoted to raise population levels of physical activity for health. National sport participation policy focuses on complex community provision tailored to diverse local users. Few quality research studies exist that examine the role of community sport interventions in raising physical activity levels and no research to date has examined the costs and cost-effectiveness of such provision. This study is a protocol for the design, outcome, process and economic evaluation of a complex community sport intervention to increase levels of physical activity, the Health and Sport Engagement (HASE) project part of the national Get Healthy Get Active programme led by Sport England. The HASE study is a collaborative partnership between local community sport deliverers and sport and public health researchers. It involves designing, delivering and evaluating community sport interventions. The aim is to engage previously inactive people in sustained sporting activity for 1×30 min a week and to examine associated health and well-being outcomes. The study uses mixed methods. Outcomes (physical activity, health, well-being costs to individuals) will be measured by a series of self-report questionnaires and attendance data and evaluated using interrupted time series analysis controlling for a range of sociodemographic factors. Resource use will be identified and measured using diaries, interviews and records and presented alongside effectiveness data as incremental cost-effectiveness ratios and cost-effectiveness acceptability curves. A longitudinal process evaluation (focus groups, structured observations, in-depth interview methods) will examine the efficacy of the project for achieving its aim using the principles of thematic analysis. The results of this study will be disseminated through peer-reviewed publications, academic conference presentations, Sport England and national public health organisation policy conferences, and practice-based case studies

  16. Accessibility through user-centred and Inclusive Design processes

    DEFF Research Database (Denmark)

    Herriott, Richard

    2014-01-01

    This PhD dissertation addresses the subject of accessibility through user-centred and Inclusive Design processes (ID). The project takes as its starting point the observation that the concept of Inclusive Design is not adequately delimited. The supporting literature in the field of ID is structured...... around the fact that the needs of individuals with reduced capabilities compared to the norm (referred to for convenience as "the elderly and disabled") have not been properly addressed by standard design processes. In response to this fact, ID is a proposed design method to find more effective means...

  17. Theory and Practice Meets in Industrial Process Design -Educational Perspective-

    Science.gov (United States)

    Aramo-Immonen, Heli; Toikka, Tarja

    Software engineer should see himself as a business process designer in enterprise resource planning system (ERP) re-engineering project. Software engineers and managers should have design dialogue. The objective of this paper is to discuss the motives to study the design research in connection of management education in order to envision and understand the soft human issues in the management context. Second goal is to develop means of practicing social skills between designers and managers. This article explores the affective components of design thinking in industrial management domain. In the conceptual part of this paper are discussed concepts of network and project economy, creativity, communication, use of metaphors, and design thinking. Finally is introduced empirical research plan and first empirical results from design method experiments among the multi-disciplined groups of the master-level students of industrial engineering and management and software engineering.

  18. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  19. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  20. Ergonomics in Design Processes: The journey from Ergonomist toward Workspace Designer

    DEFF Research Database (Denmark)

    Seim, Rikke; Broberg, Ole; Andersen, Vibeke

    2014-01-01

    in workplace design processes in companies. The basic idea in Workspace Design was that ergonomists should take a new role and apply new participatory methods when involved as consultants. The course of the project was evaluated by the application of social learning theory. The goal was to find out if and why...

  1. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    International Nuclear Information System (INIS)

    CLEVELAND, K.J.

    2000-01-01

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage

  2. Facilitating Teamwork in the Design Process

    DEFF Research Database (Denmark)

    Bang, Anne Louise; Nissen, Kirsten

    2009-01-01

    By approaching the Repertory Grid as an exploratory design game and drawing on insight in diagrammatic reasoning we argue that this approach is useful in supporting team work in the design process. In this paper we draw on two courses inviting textile design students to contribute to the developm......By approaching the Repertory Grid as an exploratory design game and drawing on insight in diagrammatic reasoning we argue that this approach is useful in supporting team work in the design process. In this paper we draw on two courses inviting textile design students to contribute...

  3. Aligning BIM with FM: streamlining the process for future projects

    Directory of Open Access Journals (Sweden)

    Colleen Kasprzak

    2012-12-01

    Full Text Available A study performed by the National Institute of Standards and Technology (NIST, USA in 2004 found that owners account for approximately $10.6 billion of the $15.8 billion total inadequate interoperability costs of U.S. capital facility projects in 2002. Because of these inefficiency costs, it becomes vital that information produced during the design and construction phases of a project be transferred into operations with maximum leverage to the end users. However, very few owners have defined these informational needs or developed an integration strategy into existing maintenance management systems. To increase operational efficiency, an organization must first develop an understanding of their operating systems, as well as identify how Building Information Modeling (BIM will add value to their daily tasks. The Pennsylvania State University (PSU has a unique opportunity to diversely implement BIM processes because not only does the University act as an owner, but also as designer and construction manager on the majority of projects. The struggle that PSU faces is one that is unique only to owners with a large, existing, multifaceted building inventory. This paper outlines the current initiative by the Office of Physical Plant (OPP, the asset manager at PSU, to develop an information exchange framework between BIM and FM applications to be used internally. As a result of this research, PSU has been able to define owner operational requirements for future projects and develop a flexible integration framework to support additional BIM tasks and information exchanges.

  4. Initial design process of the repository

    International Nuclear Information System (INIS)

    Osmanlioglu, A.E.

    2001-01-01

    The concept of the final disposal of high level wastes is to isolate the waste from the biosphere for extremely long periods of time by emplacement of wastes into deep stable geological formations. Several geological formations have been considered as candidate host environments for high level waste disposal and several techniques have been developed for repository design. In this study, interrelationships of main parameters of a general repository design have been defined and effective parameters are shown at each step. Initial design process is based on the long term stability of underground openings as disposal galleries. For this reason, this design process includes two main analyses: mechanical analysis and thermal analysis. Each of the analysis systems is directly related to each other by technical precautions. As a result of this design process, general information about the acceptable depth of the repository, layout and emplacement pattern can be taken. Final design study can be established on the result of initial design process. (author)

  5. Case study B. Architectural design management using a project web

    NARCIS (Netherlands)

    DeClerck, F.; Pels, H.J.; Otter, den A.F.H.J.; Emmitt, S.; Prins, M.; Otter, den A.F.

    2009-01-01

    In this chapter the use and organization of use of a project website is described in the design and realization of a construction project. The case concerns a complicated project with a high number of different parties involved, managed by an architectural office and having an internationally

  6. The CANDU 9 distributed control system design process

    International Nuclear Information System (INIS)

    Harber, J.E.; Kattan, M.K.; Macbeth, M.J.

    1997-01-01

    Canadian designed CANDU pressurized heavy water nuclear reactors have been world leaders in electrical power generation. The CANDU 9 project is AECL's next reactor design. Plant control for the CANDU 9 station design is performed by a distributed control system (DCS) as compared to centralized control computers, analog control devices and relay logic used in previous CANDU designs. The selection of a DCS as the platform to perform the process control functions and most of the data acquisition of the plant, is consistent with the evolutionary nature of the CANDU technology. The control strategies for the DCS control programs are based on previous CANDU designs but are implemented on a new hardware platform taking advantage of advances in computer technology. This paper describes the design process for developing the CANDU 9 DCS. Various design activities, prototyping and analyses have been undertaken in order to ensure a safe, functional, and cost-effective design. (author)

  7. Practicing universal design to actual hand tool design process.

    Science.gov (United States)

    Lin, Kai-Chieh; Wu, Chih-Fu

    2015-09-01

    UD evaluation principles are difficult to implement in product design. This study proposes a methodology for implementing UD in the design process through user participation. The original UD principles and user experience are used to develop the evaluation items. Difference of product types was considered. Factor analysis and Quantification theory type I were used to eliminate considered inappropriate evaluation items and to examine the relationship between evaluation items and product design factors. Product design specifications were established for verification. The results showed that converting user evaluation into crucial design verification factors by the generalized evaluation scale based on product attributes as well as the design factors applications in product design can improve users' UD evaluation. The design process of this study is expected to contribute to user-centered UD application. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  8. An Architecture Design Project: "Building" Understanding

    Science.gov (United States)

    Bush, Sarah B.; Albanese, Judith; Karp, Karen S.; Karp, Matthew

    2017-01-01

    Middle school students need relevant, meaningful contexts to apply emerging mathematical ideas. In this project, through the context of an architecture investigation, seventh-grade students engaged in mathematics involving area, surface area, volume, ratios and proportional thinking, number sense, and technology integration. Students, working in…

  9. Building a Creative Ecosystem: The Young Designers on Location Project

    Science.gov (United States)

    Davies, Dan; Howe, Alan; Haywood, Susan

    2004-01-01

    This article reports on findings from a research project designed to explore ways in which creativity can be fostered through interactions between selected children, particular environments, materials, techniques and key adults. The Young Designers on Location (YDoL) project was funded by the National Endowment for Science, Technology and the Arts…

  10. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  11. DOUBLE-WALL COLLIMATOR DESIGN OF THE SNS PROJECT

    International Nuclear Information System (INIS)

    SIMOS, N.; LUDEWIG, H.; CATALAN-LASHERAS, N.; CRIVELLO, S.

    2001-01-01

    The collimator absorber array of the Spallation Neutron Source (SNS) project is responsible for stopping the 1.0 GeV protons that are in the halo of the beam. It is estimated that 0.1% of the 2 MW beam will be intercepted by the adopted collimating scheme implemented at various sections of the beam transport and accumulation. This paper summarizes the conceptual design of the collimator absorber as well as the supporting detailed analysis that were performed and guided the design process. Key requirement in the design process is the need for the collimator beam tube to minimize beam impedance while closely following its beta function. Due to lack of available experimental data, the long-term behavior of irradiated materials in an environment where they interface with coolant flow becomes an issue. Uncertainties in the long-term behavior prompted a special double-wall design that will enable not only beam halo interception but also the efficient transfer of deposited energy both under normal and off-normal conditions to the coolant flow. The thermo-mechanical response of the double wall beam tube and of a particle bed surrounding it are discussed in detail in the paper

  12. Key Success Factors and Guidance for International Collaborative Design Projects

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2015-11-01

    Full Text Available In the built environment (BE sector, the co-creation process of design demands understanding of requirements (as viewed by parties involved, mobilisation of tacit knowledge, negotiation, and complex exchange of information. The need to collaborate over distance has further exacerbated the complexity of the process, and, in itself, represents a significant challenge for BE professionals who are increasingly expected to undertake this process within globally distributed virtual teams. The research aims to identify key success factors and develop guidance for international collaborative design projects, via the implementation of collaborative design courses in UK and Canadian universities over three academic years. Questionnaire surveys, focus groups, observation of online meetings, personal reflections provided data for the analysis. The findings reveal the significance of the perceived risk of collaboration and a difference in preferred communication mode between architects and civil/structural engineers. These findings suggest the impact of training in the subject discipline, and that the opportunity for co-located working has helped the development of trust. The guidance is aimed at BE educators who wish to implement this activity in their courses.

  13. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  14. Construction Analysis during the Design Process

    NARCIS (Netherlands)

    Vries, de B.; Harink, J.M.J.; Martens, B.; Brown, A.

    2005-01-01

    4D CAD systems are used by contractors for visually checking the construction process. To enable simulation of the construction process, the construction planner links building components from a CAD model with the activities from a project planning. In this paper we describe a method to generate a

  15. Decision-making process in investment projects

    OpenAIRE

    Moutinho, Nuno

    2011-01-01

    We present projects evaluation approaches in what decision should be based. We try to understand what we have to take into account in a project analysis, knowing that we have to consider much unmeasured aspects, like non non-financial areas. We verify how all aspects are used and analysed in the project appraisal. We also desire to understand if companies have adequate tools and methods to correctly analyse and to take decisions in a project evaluation. In this study we identify several as...

  16. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  17. Design and analysis of nuclear processes with the APROS

    International Nuclear Information System (INIS)

    Haenninen, M.; Puska, E.K.; Nystroem, P.

    1987-01-01

    APROS (Advanced Process Simulator) is the product being developed in the process simulators project of Imatran Voima Co. and Technical Research Centre of Finland. The aim is to design and construct an efficient and easy to use computer simulation system for process and automation system design, evaluation, analysis, testing and training purposes. As halfway of this project a working system exists with a large number of proven routines and models. However, a lot of development is still foreseen before the project will be finished. This article gives an overview of the APROS in general and of the nuclear features in particular. The calculational capabilities of the system are presented with the help of one example. (orig.)

  18. THEORETICAL FRAMES FOR DESIGNING REVERSE LOGISTICS PROCESSES

    OpenAIRE

    Janusz K. Grabara; Sebastian Kot

    2009-01-01

    Logistics processes of return flow became more and more important in present business practice. Because of better customer satisfaction, environmental and financial aspects many enterprises deal with reverse logistics performance. The paper is a literature review focused on the design principles of reverse logistics processes Keywords: reverse logistics, designing.

  19. EPR design tools. Integrated data processing tools

    International Nuclear Information System (INIS)

    Kern, R.

    1997-01-01

    In all technical areas, planning and design have been supported by electronic data processing for many years. New data processing tools had to be developed for the European Pressurized Water Reactor (EPR). The work to be performed was split between KWU and Framatome and laid down in the Basic Design contract. The entire plant was reduced to a logical data structure; the circuit diagrams and flowsheets of the systems were drafted, the central data pool was established, the outlines of building structures were defined, the layout of plant components was planned, and the electrical systems were documented. Also building construction engineering was supported by data processing. The tasks laid down in the Basic Design were completed as so-called milestones. Additional data processing tools also based on the central data pool are required for the phases following after the Basic Design phase, i.e Basic Design Optimization; Detailed Design; Management; Construction, and Commissioning. (orig.) [de

  20. Facilitating Teamwork in the Design Process

    DEFF Research Database (Denmark)

    Bang, Anne Louise; Nissen, Kirsten

    2009-01-01

    By approaching the Repertory Grid as an exploratory design game and drawing on insight in diagrammatic reasoning we argue that this approach is useful in supporting team work in the design process. In this paper we draw on two courses inviting textile design students to contribute to the developm...

  1. The design process and the use of computerized tools in control room design

    International Nuclear Information System (INIS)

    Wahlstroem, B.; Heinonen, R.; Ranta, J.; Haarla, J.

    1985-09-01

    Control room design has proven an important component when the safety and availability of a complex industrial process plant are considered. Many control room deficiencies can be traced back to oversights and other errors during the design process. The introduction of powerful computers and software for computer-aided design (CAD) offers one possibility when tools for improving the quality of design are being selected. The report gives a broad assessment of problems of design and the benefits of using computer-aided design. One proposal for a structure of a computer-aided design system is considered in more detail. In this system special emphasis has been laid on dealing with requirements during design process. A demonstration system has been built and sample system user dialogues are described. The report is the final report of the LIT3.1 project of the Nordic cooperation on human reliability in the energy production field. (author)

  2. Musical Instrument Design Process for Mobile Technology

    OpenAIRE

    Barraclough, Timothy J.; Carnegie, Dale A.; Kapur, Ajay

    2015-01-01

    This paper presents the iterative design process based upon multiple rounds of user studies that guided the the design of a novel social music application, Pyxis Minor. The application was designed based on the concept of democratising electronic music creation and performance. This required the development to be based upon user studies to inform and drive the development process in order to create a novel musical interface that can be enjoyed by users of any prior musicianship training.

  3. PROPOSAL OF SPATIAL OPTIMIZATION OF PRODUCTION PROCESS IN PROCESS DESIGNER

    Directory of Open Access Journals (Sweden)

    Peter Malega

    2015-03-01

    Full Text Available This contribution is focused on optimizing the use of space in the production process using software Process Designer. The aim of this contribution is to suggest possible improvements to the existing layout of the selected production process. Production process was analysed in terms of inputs, outputs and course of actions. Nowadays there are many software solutions aimed at optimizing the use of space. One of these software products is the Process Designer, which belongs to the product line Tecnomatix. This software is primarily aimed at production planning. With Process Designer is possible to design the layout of production and subsequently to analyse the production or to change according to the current needs of the company.

  4. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  5. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    The pattern of information flow through the network of interdependent design activities is thought to be an important determinant of engineering design process results. A previously unexplored aspect of such patterns relates to the temporal dynamics of information transfer between activities...... design process and thus support theory-building toward the evolution of information flows through systems engineering stages. Implications include guidance on how to analyze and predict information flows as well as better planning of information flows in engineering design projects according...

  6. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  7. Projecting regulatory expectations for advanced reactor designs

    International Nuclear Information System (INIS)

    Viktorov, A.

    2011-01-01

    This paper explores the overarching safety principles that will likely guide the safety design of advanced reactor technologies. As will be shown, the already established safety framework provides a solid foundation for the safety design of future nuclear power plants. As a specific example, the principle of 'proven technology' is presented in greater detail and its implications for a novel technology are discussed. Research, modeling and prototyping are shown to be components in satisfying this principle. While the fundamental safety principles are in place, their interpretation may depend both on the considered technology as well as the national context. Thus, the regulatory authority will need to be engaged, at an appropriate stage of the technology development, in specifying the regulatory requirements that will have to be met for a specific reactor design. (author)

  8. Accumulator ring design for the NSNS project

    International Nuclear Information System (INIS)

    Weng, W.T.; Alessi, J.; Beebe-Wang, J.

    1997-01-01

    The goal of the proposed National Spallation Neutron Source (NSNS) is to provide a short pulse proton beam of about 0.5 μs with average beam power of 1 MW. To achieve such purpose, a proton storage ring operated at 60 Hz with 1 x 10 14 protons per pulse at 1 GeV is required. The Accumulator Ring (AR) receives 1 msec long H - beam bunches of 28 mA from a 1 GeV linac. Scope and design performance goals of the AR are presented, other possible technological choices and design options considered, but not adopted, are also briefly reviewed

  9. PM2 : a Process Mining Project Methodology

    NARCIS (Netherlands)

    Eck, van M.L.; Lu, X.; Leemans, S.J.J.; Aalst, van der W.M.P.; Zdravkovic, J.; Kirikova, M.; Johannesson, P.

    2015-01-01

    Process mining aims to transform event data recorded in information systems into knowledge of an organisation’s business processes. The results of process mining analysis can be used to improve process performance or compliance to rules and regulations. However, applying process mining in practice

  10. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  11. Designing reactive distillation processes with improved efficiency

    NARCIS (Netherlands)

    Almeida-Rivera, C.P.

    2005-01-01

    In this dissertation a life-span inspired perspective is taken on the conceptual design of grassroots reactive distillation processes. Attention was paid to the economic performance of the process and to potential losses of valuable resources over the process life span. The research was cast in a

  12. CAD Skills Increased through Multicultural Design Project

    Science.gov (United States)

    Clemons, Stephanie

    2006-01-01

    This article discusses how students in a college-entry-level CAD course researched four generations of their family histories and documented cultural and symbolic influences within their family backgrounds. AutoCAD software was then used to manipulate those cultural and symbolic images to create the design for a multicultural area rug. AutoCAD was…

  13. CEBAF design overview and project status

    International Nuclear Information System (INIS)

    Leemann, C.

    1988-01-01

    The Continuous Beam Accelerator Facility (CEBAF) will be an electron accelerator for nuclear physics research providing continuous beams with energies up to at least 4 GeV. The CEBAF is a recirculating linac. The design rationale, performance objectives, concept and fundamental choices for the CEBAF are discussed. 19 references, 10 figures, 1 table

  14. Duplex Design Project: Science Pilot Test.

    Science.gov (United States)

    Center for Research on Evaluation, Standards, and Student Testing, Los Angeles, CA.

    Work is reported towards the completion of a prototype duplex-design assessment instrument for grade-12 science. The student course-background questionnaire and the pretest section of the two-stage instrument that was developed were administered to all 134 12th-grade students at St. Clairsville High School (Ohio). Based on the information obtained…

  15. DESIGN FOCUSED ORIENTATION PROCESSES FOR MANAGING INVESTMENT COMPANIES IN THE FOREIGN EXCHANGE MARKET

    Directory of Open Access Journals (Sweden)

    Анатолий Аркадьевич АНАТОЛЬЕВ

    2015-05-01

    Full Text Available This report examines the investment companies operating in the market Forex. Business process analysis showed the design direction of their activities. Dedicated two groups of projects of investment companies can position them as project-oriented organization.

  16. Conceptual Design of Industrial Process Displays

    DEFF Research Database (Denmark)

    Pedersen, C.R.; Lind, Morten

    1999-01-01

    discusses aspects of process display design taking into account both the designer's and the operator's points of view. Three aspects are emphasized: the operator tasks, the display content and the display form. The distinction between these three aspects is the basis for proposing an outline for a display......Today, process displays used in industry are often designed on the basis of piping and instrumentation diagrams without any method of ensuring that the needs of the operators are fulfilled. Therefore, a method for a systematic approach to the design of process displays is needed. This paper...... by a simple example from a plant with batch processes. Later the method is applied to develop a supervisory display for a condenser system in a nuclear power plant. The differences between the continuous plant domain of power production and the batch processes from the example are analysed and broad...

  17. Yucca Mountain Project Subsurface Facilities Design

    International Nuclear Information System (INIS)

    Linden, A.; Saunders, R.S.; Boutin, R.J.; Harrington, P.G.; Lachman, K.D.; Trautner, L.J.

    2002-01-01

    Four units of the Topopah Springs formation (volcanic tuff) are considered for the proposed repository: the upper lithophysal, the middle non-lithophysal, the lower lithophysal, and the lower non-lithophysal. Yucca Mountain was recently designated the site for a proposed repository to dispose of spent nuclear fuel and high-level radioactive waste. Work is proceeding to advance the design of subsurface facilities to accommodate emplacing waste packages in the proposed repository. This paper summarized recent progress in the design of subsurface layout of the proposed repository. The original Site Recommendation (SR) concept for the subsurface design located the repository largely within the lower lithophysal zone (approximately 73%) of the Topopah The Site Recommendation characterized area suitable for emplacement consisted of the primary upper block, the lower block and the southern upper block extension. The primary upper block accommodated the mandated 70,000 metric tons of heavy metal (MTHM) at a 1.45 kW/m hear heat load. Based on further study of the Site Recommendation concept, the proposed repository siting area footprint was modified to make maximum use of available site characterization data, and thus, reduce uncertainties associated with performance assessment. As a result of this study, a modified repository footprint has been proposed and is presently being review for acceptance by the DOE. A panel design concept was developed to reduce overall costs and reduce the overall emplacement schedule. This concept provides flexibility to adjust the proposed repository subsurface layout with time, as it makes it unnecessary to ''commit'' to development of a large single panel at the earliest stages of construction. A description of the underground layout configuration and influencing factors that affect the layout configuration are discussed in the report

  18. Management of Multi-projects In a Process oriented Organization

    OpenAIRE

    Macheridis, Nikos; Nilsson, Carl-Henrik

    2006-01-01

    When projects are used as an organisational platform to conduct business, a project can be the only project in the organisation or one amongst several others. The latter case is called multi-project organisation. Usually an organization with a multi-project environment has a base organisation, which can be functional, matrix structure or another. The purpose of this article is to develop a model based on a process oriented organization as a complement to functional or matrix organizational st...

  19. Design Process Improvement for Electric CAR Harness

    Science.gov (United States)

    Sawatdee, Thiwarat; Chutima, Parames

    2017-06-01

    In an automobile parts design company, the customer satisfaction is one of the most important factors for product design. Therefore, the company employs all means to focus its product design process based on the various requirements of customers resulting in high number of design changes. The objective of this research is to improve the design process of the electric car harness that effects the production scheduling by using Fault Tree Analysis (FTA) and Failure Mode and Effect Analysis (FMEA) as the main tools. FTA is employed for root cause analysis and FMEA is used to ranking a High Risk Priority Number (RPN) which is shows the priority of factors in the electric car harness that have high impact to the design of the electric car harness. After the implementation, the improvements are realized significantly since the number of design change is reduced from 0.26% to 0.08%.

  20. Multidisciplinary systems engineering architecting the design process

    CERN Document Server

    Crowder, James A; Demijohn, Russell

    2016-01-01

    This book presents Systems Engineering from a modern, multidisciplinary engineering approach, providing the understanding that all aspects of systems design, systems, software, test, security, maintenance and the full life-cycle must be factored in to any large-scale system design; up front, not factored in later. It lays out a step-by-step approach to systems-of-systems architectural design, describing in detail the documentation flow throughout the systems engineering design process. It provides a straightforward look and the entire systems engineering process, providing realistic case studies, examples, and design problems that will enable students to gain a firm grasp on the fundamentals of modern systems engineering.  Included is a comprehensive design problem that weaves throughout the entire text book, concluding with a complete top-level systems architecture for a real-world design problem.

  1. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  2. Hidden realities inside PBL design processes

    DEFF Research Database (Denmark)

    Pihl, Ole Verner

    2015-01-01

    Design Process, but is a group-based architecture and design education better than that which is individually based? How does PBL affect space, form, and creative processes? Hans Kiib, professor and one of the founders of the Department of Architecture and Design in Aalborg, describes his intentions...... are passing from a complex world into one based on super complexity? Could Gaston Bachelard (1958), who writes in his book The Poetic of Space "that poets and artists are born phenomenologists," help architecture and design students in their journey to find his/her own professional expression? This paper...

  3. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  4. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  5. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  6. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  7. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    This paper aims to emphasize the necessity of introducing Project-Based Learning (PBL) to design enterprises in order to foster designers creativity and facilitate innovation of design enterprises. According to the literature review, creativity can be viewed as the first stage of innovation; PBL...

  8. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  9. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  10. Design variables and constraints in fashion store design processes

    DEFF Research Database (Denmark)

    Haug, Anders; Borch Münster, Mia

    2015-01-01

    is to identify the most important store design variables, organise these variables into categories, understand the design constraints between categories, and determine the most influential stakeholders. Design/methodology/approach: – Based on a discussion of existing literature, the paper defines a framework...... into categories, provides an understanding of constraints between categories of variables, and identifies the most influential stakeholders. The paper demonstrates that the fashion store design task can be understood through a system perspective, implying that the store design task becomes a matter of defining......Purpose: – Several frameworks of retail store environment variables exist, but as shown by this paper, they are not particularly well-suited for supporting fashion store design processes. Thus, in order to provide an improved understanding of fashion store design, the purpose of this paper...

  11. Engineering design: A cognitive process approach

    Science.gov (United States)

    Strimel, Greg Joseph

    The intent of this dissertation was to identify the cognitive processes used by advanced pre-engineering students to solve complex engineering design problems. Students in technology and engineering education classrooms are often taught to use an ideal engineering design process that has been generated mostly by educators and curriculum developers. However, the review of literature showed that it is unclear as to how advanced pre-engineering students cognitively navigate solving a complex and multifaceted problem from beginning to end. Additionally, it was unclear how a student thinks and acts throughout their design process and how this affects the viability of their solution. Therefore, Research Objective 1 was to identify the fundamental cognitive processes students use to design, construct, and evaluate operational solutions to engineering design problems. Research Objective 2 was to determine identifiers within student cognitive processes for monitoring aptitude to successfully design, construct, and evaluate technological solutions. Lastly, Research Objective 3 was to create a conceptual technological and engineering problem-solving model integrating student cognitive processes for the improved development of problem-solving abilities. The methodology of this study included multiple forms of data collection. The participants were first given a survey to determine their prior experience with engineering and to provide a description of the subjects being studied. The participants were then presented an engineering design challenge to solve individually. While they completed the challenge, the participants verbalized their thoughts using an established "think aloud" method. These verbalizations were captured along with participant observational recordings using point-of-view camera technology. Additionally, the participant design journals, design artifacts, solution effectiveness data, and teacher evaluations were collected for analysis to help achieve the

  12. Foaming in Hanford River Protection Project Waste Treatment Plant LAW Evaporation Processes - FY01 Summary Report

    International Nuclear Information System (INIS)

    Calloway, T.B.

    2002-01-01

    The LAW evaporation processes currently being designed for the Hanford River Protection Project Waste Treatment Plant are subject to foaming. Experimental simulant studies have been conducted in an effort to achieve an effective antifoam agent suitable to mitigate such foaming

  13. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  14. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  15. Designing Project Management for Global Software Development

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; B. Balogh, Maria; Iversen, Cathrine

    2014-01-01

    of distributed software teams, based on a practice study and informed by well-known theories. Our work pinpoints the difficulties of handling the vital informal processes in distributed collaboration that are so vulnerable because the distances risk detaining their growth and increasing their decay rate......Software development in distributed teams remains challenging despite rapid technical improvement in tools for communication and collaboration across distance. The challenges stem from geographical, temporal and sociocultural distance and manifest themselves in a variety of difficulties...

  16. NPP-Nuclear Island Design. From conceptual design to Project execution

    International Nuclear Information System (INIS)

    Lanchet, Dominique

    2014-01-01

    The second day opened with the lecture of Dominique Lanchet, Design Senior Vice President at AREVA Engineering and Project. Dominique Lanchet gave us an overview of the steps of a Nuclear Island Design creation from the conceptual design to the project execution, giving the examples of the EPR and ATMEA1 TM nuclear reactors

  17. Project margins of advanced reactor design WWER-500

    International Nuclear Information System (INIS)

    Rogov, M.F.; Birukov, G.I.; Ershov, V.G.; Volkov, B.E.

    1994-01-01

    Project criteria for design of advanced WWER-500 reactor within design conditions are compared to the requirements of the Russian regulatory guides. Normal operation limits, safe operation limits for main anticipated operational occurrences and design limits accepted for design basis accidents are considered as in preliminary safety report. It is shown that the basic design criteria in the design of WWER-500 for the anticipated operational occurrences and for design basis accidents are more severe than required in the following regulatory guides General Safety Regulations for Nuclear Power Plants and Nuclear Safety Rules for Reactors of Nuclear Power Plants. This provides certain margins from safety point of view

  18. Design for embedded image processing on FPGAs

    CERN Document Server

    Bailey, Donald G

    2011-01-01

    "Introductory material will consider the problem of embedded image processing, and how some of the issues may be solved using parallel hardware solutions. Field programmable gate arrays (FPGAs) are introduced as a technology that provides flexible, fine-grained hardware that can readily exploit parallelism within many image processing algorithms. A brief review of FPGA programming languages provides the link between a software mindset normally associated with image processing algorithms, and the hardware mindset required for efficient utilization of a parallel hardware design. The bulk of the book will focus on the design process, and in particular how designing an FPGA implementation differs from a conventional software implementation. Particular attention is given to the techniques for mapping an algorithm onto an FPGA implementation, considering timing, memory bandwidth and resource constraints, and efficient hardware computational techniques. Extensive coverage will be given of a range of image processing...

  19. Integration of case study approach, project design and computer ...

    African Journals Online (AJOL)

    Integration of case study approach, project design and computer modeling in managerial accounting education ... Journal of Fundamental and Applied Sciences ... in the Laboratory of Management Accounting and Controlling Systems at the ...

  20. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  1. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... of this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  2. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  3. Integrating rock mechanics issues with repository design through design process principles and methodology

    International Nuclear Information System (INIS)

    Bieniawski, Z.T.

    1996-01-01

    A good designer needs not only knowledge for designing (technical know-how that is used to generate alternative design solutions) but also must have knowledge about designing (appropriate principles and systematic methodology to follow). Concepts such as open-quotes design for manufactureclose quotes or open-quotes concurrent engineeringclose quotes are widely used in the industry. In the field of rock engineering, only limited attention has been paid to the design process because design of structures in rock masses presents unique challenges to the designers as a result of the uncertainties inherent in characterization of geologic media. However, a stage has now been reached where we are be able to sufficiently characterize rock masses for engineering purposes and identify the rock mechanics issues involved but are still lacking engineering design principles and methodology to maximize our design performance. This paper discusses the principles and methodology of the engineering design process directed to integrating site characterization activities with design, construction and performance of an underground repository. Using the latest information from the Yucca Mountain Project on geology, rock mechanics and starter tunnel design, the current lack of integration is pointed out and it is shown how rock mechanics issues can be effectively interwoven with repository design through a systematic design process methodology leading to improved repository performance. In essence, the design process is seen as the use of design principles within an integrating design methodology, leading to innovative problem solving. In particular, a new concept of open-quotes Design for Constructibility and Performanceclose quotes is introduced. This is discussed with respect to ten rock mechanics issues identified for repository design and performance

  4. Development and design of a cementation process

    International Nuclear Information System (INIS)

    Vicente, R.

    1986-01-01

    The conceptual design of a facility for the immobilization of intermediate level liquid waste in cement is presented. The cementation process adopted a vibration assisted mixing process. The solidified waste is packed in 200 litres drum with barite concrete lining. The waste package is classified as Type A package for transport. (Author) [pt

  5. Development and design of a cementation process

    International Nuclear Information System (INIS)

    Vicente, R.

    1987-01-01

    The conceptual design of a facility for the immobilization of intermediate-level liquid wastes in cement is presented. The cementation process adopted a vibration assisted mixing process. The solidified waste is packed in 200 litres drum with barite concrete lining. The waste package is classified as Type A package for transport. (Author) [pt

  6. Chemical kinetics and oil shale process design

    Energy Technology Data Exchange (ETDEWEB)

    Burnham, A.K.

    1993-07-01

    Oil shale processes are reviewed with the goal of showing how chemical kinetics influences the design and operation of different processes for different types of oil shale. Reaction kinetics are presented for organic pyrolysis, carbon combustion, carbonate decomposition, and sulfur and nitrogen reactions.

  7. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  8. Design considerations for the Yucca Mountain project exploratory shaft facility

    International Nuclear Information System (INIS)

    Bullock, R.L. Sr.

    1990-01-01

    This paper reports on the regulatory/requirements challenges of this project which exist because this is the first facility of its kind to ever be planned, characterized, designed, and built under the purview of a U.S. Nuclear Regulatory Agency. The regulations and requirements that flow down to the Architect/Engineer (A/E) for development of the Exploratory Shaft Facility (ESF) design are voluminous and unique to this project. The subsurface design and construction of the ESF underground facility may eventually become a part of the future repository facility and, if so, will require licensing by the Nuclear Regulatory Commission (NRC). The Fenix and Scisson of Nevada-Yucca Mountain Project (FSN-YMP) group believes that all of the UMP design and construction related activities, with good design/construct control, can be performed to meet all engineering requirements, while following a strict quality assurance program that will also meet regulatory requirements

  9. The iSAT Project Mechanical properties and designs

    KAUST Repository

    Llewellyn, Gareth

    2011-08-08

    The whale shark Rhincodon typus is the largest fish in the world. The global population of R.typus is unknown however the International Union for Conservation of Nature (IUNC) classified it as Vulnerable in 2005. To ensure a population of R.typus is maintained protection from direct fishing, by-catch and collision damage is required. To be able to enact successful protection the habitat and range of R.typus must be known. Many authors have conducted studies of R.typus in a variety of different locations and many more have reported sightings. In many locations R.typus consistently appear annually and many authors have hypothesised reasons for their appearance. What is not known however is whether these populations are isolated or inter-linked, and where these populations go when they are not at known sites. The aim of this thesis was to design the body of a vessel that could house the electronics and components designed to track an acoustic tag, survive in open ocean, and travel fast enough to keep up with R.typus allowing a long-term and high resolution track to be compiled. In order to design such a vessel many factors needed to be known. A large part of this thesis is a review of literature to conclude the most appropriate type of vessel, the average speed of R.typus, hence the required speed of the vessel, and the sea state of the Red Sea, hence the conditions the vessel would be required to survive in. It was concluded that the average speed of R.typus is 1.2 knots; the Red Sea reaches Sea State 5-6; and the most appropriate hull type for this project was a Small Waterplane Area Twin Hull (SWATH). After following a design iteration process, a final design was completed that it is believed will achieve all the required objectives.

  10. The use of process mapping in healthcare quality improvement projects.

    Science.gov (United States)

    Antonacci, Grazia; Reed, Julie E; Lennox, Laura; Barlow, James

    2018-05-01

    Introduction Process mapping provides insight into systems and processes in which improvement interventions are introduced and is seen as useful in healthcare quality improvement projects. There is little empirical evidence on the use of process mapping in healthcare practice. This study advances understanding of the benefits and success factors of process mapping within quality improvement projects. Methods Eight quality improvement projects were purposively selected from different healthcare settings within the UK's National Health Service. Data were gathered from multiple data-sources, including interviews exploring participants' experience of using process mapping in their projects and perceptions of benefits and challenges related to its use. These were analysed using inductive analysis. Results Eight key benefits related to process mapping use were reported by participants (gathering a shared understanding of the reality; identifying improvement opportunities; engaging stakeholders in the project; defining project's objectives; monitoring project progress; learning; increased empathy; simplicity of the method) and five factors related to successful process mapping exercises (simple and appropriate visual representation, information gathered from multiple stakeholders, facilitator's experience and soft skills, basic training, iterative use of process mapping throughout the project). Conclusions Findings highlight benefits and versatility of process mapping and provide practical suggestions to improve its use in practice.

  11. Logic-programming language enriches design processes

    Energy Technology Data Exchange (ETDEWEB)

    Kitson, B.; Ow-Wing, K.

    1984-03-22

    With the emergence of a set of high-level CAD tools for programmable logic devices, designers can translate logic into functional custom devices simply and efficiently. The core of the package is a blockstructured hardware description language called PLPL, for ''programmable-logic programming language.'' The cheif advantage of PLPL lies in its multiple input formats, which permit different design approaches for a variety of design problems. The higher the level of the approach, the closer PLPL will come to directly specifying the desired function. Intermediate steps in the design process can be eliminated, along with the errors that might have been generated during those steps.

  12. THE PRODUCT DESIGN PROCESS USING STYLISTIC SURFACES

    Directory of Open Access Journals (Sweden)

    Arkadiusz Gita

    2017-06-01

    Full Text Available The increasing consumer requirements for the way what everyday use products look like, forces manufacturers to put more emphasis on product design. Constructors, apart from the functional aspects of the parts created, are forced to pay attention to the aesthetic aspects. Software for designing A-class surfaces is very helpful in this case. Extensive quality analysis modules facilitate the work and allow getting models with specific visual features. The authors present a design process of the product using stylistic surfaces based on the front panel of the moped casing. In addition, methods of analysis of the design surface and product technology are presented.

  13. Designing heat exchangers for process heat reactors

    International Nuclear Information System (INIS)

    Quade, R.N.

    1980-01-01

    A brief account is given of the IAEA specialist meeting on process heat applications technology held in Julich, November 1979. The main emphasis was on high temperature heat exchange. Papers were presented covering design requirements, design construction and prefabrication testing, and selected problems. Primary discussion centered around mechanical design, materials requirements, and structural analysis methods and limits. It appears that high temperature heat exchanges design to nuclear standards, is under extensive development but will require a lengthy concerted effort before becoming a commercial reality. (author)

  14. Designing “Theory of Machines and Mechanisms” course on Project Based Learning approach

    DEFF Research Database (Denmark)

    Shinde, Vikas

    2013-01-01

    by the industry and the learning outcomes specified by the National Board of Accreditation (NBA), India; this course is restructured on Project Based Learning approach. A mini project is designed to suit course objectives. An objective of this paper is to discuss the rationale of this course design......Theory of Machines and Mechanisms course is one of the essential courses of Mechanical Engineering undergraduate curriculum practiced at Indian Institute. Previously, this course was taught by traditional instruction based pedagogy. In order to achieve profession specific skills demanded...... and the process followed to design a project which meets diverse objectives....

  15. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  16. Accumulating Project Management Knowledge Using Process Theory

    NARCIS (Netherlands)

    Niederman, Fred; March, Salvatore T.; Mueller, Benjamin

    2016-01-01

    Process theory has become an important mechanism for the accumulation of knowledge in a number of disciplines. In contrast with variance theory, which focuses on co-variation of dependent and independent variables, process theory focuses on sequences of activities, their duration and the intervals

  17. Process competencies in a problem and project based learning environment

    DEFF Research Database (Denmark)

    Du, Xiangyun; Kolmos, Anette

    2006-01-01

    with the expected professional competencies. Based on the educational practice of PBL Aalborg Model, which is characterized by problem-orientation, project-organization and team work, this paper examines the process of developing process competencies through studying engineering in a PBL environment from...... process competencies through doing problem and project based work in teams? 2) How do students perceive their achievement of these process competencies?......Future engineers are not only required to master technological competencies concerning solving problems, producing and innovating technology, they are also expected to have capabilities of cooperation, communication, and project management in diverse social context, which are referred to as process...

  18. Radiological Design Summary Report for TRU Vent and Purge Process

    International Nuclear Information System (INIS)

    Taus, L.B.

    2004-01-01

    This report contains top-level requirements for the various areas of radiological protection for workers. Detailed quotations of the requirements for applicable regulatory documents can be found in the accompanying Implementation Guide. For the purposes of demonstrating compliance with these requirements, per Engineering Standard 01064, shall consider / shall evaluate indicates that the designer must examine the requirement for the design and either incorporate or provide a technical justification as to why the requirement is not incorporated. The Transuranic Vent and Purge process is not a project, but is considered a process change. This process has been performed successfully by Solid Waste on lower activity TRU drums. This summary report applies a graded approach and describes how the Transuranic Vent and Purge process meets each of the applicable radiological design criteria and requirements specified in Manual WSRC-TM-95-1, Engineering Standard Number 01064

  19. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  20. Spent nuclear fuel project design basis capacity study

    International Nuclear Information System (INIS)

    Cleveland, K.J.

    1998-01-01

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration

  1. Rethinking Design Process: Using 3D Digital Models as an Interface in Collaborative Session

    Science.gov (United States)

    Ding, Suining

    2008-01-01

    This paper describes a pilot study for an alternative design process by integrating a designer-user collaborative session with digital models. The collaborative session took place in a 3D AutoCAD class for a real world project. The 3D models served as an interface for designer-user collaboration during the design process. Students not only learned…

  2. Spacecraft design project: Low Earth orbit communications satellite

    Science.gov (United States)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  3. Method and Tool for Design Process Navigation and Automatic Generation of Simulation Models for Manufacturing Systems

    Science.gov (United States)

    Nakano, Masaru; Kubota, Fumiko; Inamori, Yutaka; Mitsuyuki, Keiji

    Manufacturing system designers should concentrate on designing and planning manufacturing systems instead of spending their efforts on creating the simulation models to verify the design. This paper proposes a method and its tool to navigate the designers through the engineering process and generate the simulation model automatically from the design results. The design agent also supports collaborative design projects among different companies or divisions with distributed engineering and distributed simulation techniques. The idea was implemented and applied to a factory planning process.

  4. Rockfall Hazard Process Assessment : Final Project Report

    Science.gov (United States)

    2017-10-01

    After a decade of using the Rockfall Hazard Rating System (RHRS), the Montana Department of Transportation (MDT) sought a reassessment of their rockfall hazard evaluation process. Their prior system was a slightly modified version of the RHRS and was...

  5. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  6. The experimental design of the Missouri Ozark Forest Ecosystem Project

    Science.gov (United States)

    Steven L. Sheriff; Shuoqiong. He

    1997-01-01

    The Missouri Ozark Forest Ecosystem Project (MOFEP) is an experiment that examines the effects of three forest management practices on the forest community. MOFEP is designed as a randomized complete block design using nine sites divided into three blocks. Treatments of uneven-aged, even-aged, and no-harvest management were randomly assigned to sites within each block...

  7. Implementing Project Based Learning Approach to Graphic Design Course

    Science.gov (United States)

    Riyanti, Menul Teguh; Erwin, Tuti Nuriah; Suriani, S. H.

    2017-01-01

    The purpose of this study was to develop a learning model based Commercial Graphic Design Drafting project-based learning approach, was chosen as a strategy in the learning product development research. University students as the target audience of this model are the students of the fifth semester Visual Communications Design Studies Program…

  8. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  9. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  10. MANAGING THE BUILDING DESIGN PROCESS FOR SUSTAINABILTY AND IMPROVED QUALITY

    Directory of Open Access Journals (Sweden)

    Sunday Bobadoye

    2006-01-01

    Full Text Available The essence of building design process and management for building sustainability in the creation and maintenance of a qualitative architectural product is investigated in this paper. The design process, concept of building sustainability and particularly the quality of the built environment are discussed. Akure, a state capital in Nigeria was used as a case study. The principles and indicators for sustainability of buildings and its implications on the quality of the environment are examined in details. Survey findings include the views of the professionals on the clients, perception on the design process as well as management of projects, and the implications on the quality of the ensuring products and the city’s environment. The data were factor analyzed using varimax rotation criterion (with Kaiser Normalization. The results revealed that five factors were effective, with one of them exhibiting the greatest variability and individual differences. The variables that loaded on this factor were really the aspects of the process and management relating to the clients. The findings also revealed the professionals’ wrong attitude towards design process as shown with a very high degree of variability in the study. The paper concludes by recommending the enactment and enforcement of relevant policies with adequate education of the people and the involvement of all the stakeholders in the management of building projects and environmental programmes for the realization of a qualitative architectural product.

  11. Design of penicillin fermentation process simulation system

    Science.gov (United States)

    Qi, Xiaoyu; Yuan, Zhonghu; Qi, Xiaoxuan; Zhang, Wenqi

    2011-10-01

    Real-time monitoring for batch process attracts increasing attention. It can ensure safety and provide products with consistent quality. The design of simulation system of batch process fault diagnosis is of great significance. In this paper, penicillin fermentation, a typical non-linear, dynamic, multi-stage batch production process, is taken as the research object. A visual human-machine interactive simulation software system based on Windows operation system is developed. The simulation system can provide an effective platform for the research of batch process fault diagnosis.

  12. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  13. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

  14. Automation of the aircraft design process

    Science.gov (United States)

    Heldenfels, R. R.

    1974-01-01

    The increasing use of the computer to automate the aerospace product development and engineering process is examined with emphasis on structural analysis and design. Examples of systems of computer programs in aerospace and other industries are reviewed and related to the characteristics of aircraft design in its conceptual, preliminary, and detailed phases. Problems with current procedures are identified, and potential improvements from optimum utilization of integrated disciplinary computer programs by a man/computer team are indicated.

  15. Integrated Process Design, Control and Analysis of Intensified Chemical Processes

    DEFF Research Database (Denmark)

    Mansouri, Seyed Soheil

    chemical processes; for example, intensified processes such as reactive distillation. Most importantly, it identifies and eliminates potentially promising design alternatives that may have controllability problems later. To date, a number of methodologies have been proposed and applied on various problems......, that the same principles that apply to a binary non-reactive compound system are valid also for a binary-element or a multi-element system. Therefore, it is advantageous to employ the element based method for multicomponent reaction-separation systems. It is shown that the same design-control principles...

  16. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  17. Exploring an innovation project as source of change in organization design

    DEFF Research Database (Denmark)

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we...

  18. Integrating Project Management, Product Design with Industry Sponsored Projects provides Stimulating Senior Capstone Experiences

    Directory of Open Access Journals (Sweden)

    Phillip A. Sanger

    2011-07-01

    Full Text Available

    Abstract ¾ Many students are uncomfortable with real world engineering problems where needs and requirements must be concretely defined and the selection of design solutions is not black and white. This paper describes a two semester, multi-disciplinary senior capstone project for students from three Engineering and Technology Department programs (electrical engineering, electrical and computer engineering technology, and engineering technology that brings together the tools of project management and the creative product development process into industry sponsored projects.  The projects are fully integrated with the Center for Rapid Product Realization with its dual goals of economic development and enhanced learning.  The stage/gate development process is used with six formal reviews covering the development of the proposal through to the fabrication and testing of the project’s output.  Over the past four years thirty five (35 projects have been undertaken with students getting an exciting

  19. A projective approach to a language of landscape design

    Directory of Open Access Journals (Sweden)

    Catherine Ward Thompson

    1997-10-01

    Full Text Available Building on the work of Kelly (1955 in personal construct psychology, and Peled (1976, I990 in ecoanalysis, this paper develops projective techniques-which use concepts of personal and phenomenological space-as a means for articulating approaches to landscape design. The projective approach involves two stages. In stage one, projective techniques are used to elicit personal constructs (which may be held at a pre-conscious or sub-conscious level, allowing the holistic experience of landscape to be explored. In stage two, using a 'projection location task' derived from the way we experience and construe the regions of our own bodies, elements of these constructs can then be articulated so as to inform the way we interact and engage with the space around us. This gives insight into the meaning of spatial layouts, which can then be translated into a design language for the structural ordering of space. The author draws on original research conducted with children as well as adults, using projective techniques to draw out their desires and needs in relation to designing their landscape environment. The paper discusses the value of such methods for landscape designers and their clients, and outlines some ongoing research to test the validity of the projection location task.

  20. Integrated Process Design and Control of Reactive Distillation Processes

    DEFF Research Database (Denmark)

    Mansouri, Seyed Soheil; Sales-Cruz, Mauricio; Huusom, Jakob Kjøbsted

    2015-01-01

    on the element concept, which is used to translate a system of compounds into elements. The operation of the reactive distillation column at the highest driving force and other candidate points is analyzed through analytical solution as well as rigorous open-loop and closed-loop simulations. By application...... of this approach, it is shown that designing the reactive distillation process at the maximum driving force results in an optimal design in terms of controllability and operability. It is verified that the reactive distillation design option is less sensitive to the disturbances in the feed at the highest driving...

  1. Change in requirements during the design process

    DEFF Research Database (Denmark)

    Sudin, Mohd Nizam Bin; Ahmed-Kristensen, Saeema

    2011-01-01

    Specification is an integral part of the product development process. Frequently, more than a single version of a specification is produced due to changes in requirements. These changes are often necessary to ensure the scope of the design problem is as clear as possible. However, the negative...... on a pre-defined coding scheme. The results of the study shows that change in requirements were initiated by internal stakeholders through analysis and evaluation activities during the design process, meanwhile external stakeholders were requested changes during the meeting with consultant. All...

  2. "Emancipatory Disability Research": Project or Process?

    Science.gov (United States)

    Barnes, Colin

    2002-01-01

    This article provides an overview of the core principles and implications of emancipatory disability research. It suggests the emancipatory research paradigm has begun to transform the material and social relations of research production and concludes by suggesting that emancipatory disability should be perceived as a process rather than a…

  3. Using design science in educational technology research projects

    Directory of Open Access Journals (Sweden)

    Susan M. Chard

    2017-12-01

    Full Text Available Design science is a research paradigm where the development and evaluation of a technology artefact is a key contribution. Design science is used in many domains and this paper draws on those domains to formulate a generic structure for design science research suitable for educational technology research projects. The paper includes guidelines for writing proposals using the design science research methodology for educational technology research and presents a generic research report structure. The paper presents ethical issues to consider in design science research being conducted in educational settings and contributes guidelines for assessment when the research contribution involves the creation of a technology artefact.

  4. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  5. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  6. Sedimentation process and design of settling systems

    CERN Document Server

    De, Alak

    2017-01-01

    This book is designed to serve as a comprehensive source of information of sedimentation processes and design of settling systems, especially as applied to design of such systems in civil and environmental engineering. The book begins with an introduction to sedimentation as a whole and goes on to cover the development and details of various settling theories. The book traces the chronological developments of the comprehensive knowledge of settling studies and design of settling systems from 1889.A new concept of 'Velocity Profile Theorem', tool for settling problem analysis, has been employed to the analysis of the phenomenon of short circuiting. Complete theory of tube settling has been developed and its application to the computation of residual solids from the assorted solids through the same has been demonstrated. Experimental verification of the tube settling theory has also been presented. Field-oriented compatible design and operation methodology of settling system has been developed from the detailed...

  7. Virtual Welded - Joint Design Integrating Advanced Materials and Processing Technology

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Zhishang; Ludewig, Howard W.; Babu, S. Suresh

    2005-06-30

    Virtual Welede-Joint Design, a systematic modeling approach, has been developed in this project to predict the relationship of welding process, microstructure, properties, residual stress, and the ultimate weld fatique strength. This systematic modeling approach was applied in the welding of high strength steel. A special welding wire was developed in this project to introduce compressive residual stress at weld toe. The results from both modeling and experiments demonstrated that more than 10x fatique life improvement can be acheived in high strength steel welds by the combination of compressive residual stress from the special welding wire and the desired weld bead shape from a unique welding process. The results indicate a technology breakthrough in the design of lightweight and high fatique performance welded structures using high strength steels.

  8. Understanding Creative Design Processes by Integrating Sketching and CAD Modelling Design Environments: A Preliminary Protocol Result from Architectural Designers

    Directory of Open Access Journals (Sweden)

    Yi Teng Shih

    2015-11-01

    Full Text Available This paper presents the results of a preliminary protocol study of the cognitive behaviour of architectural designers during the design process. The aim is to better understand the similarities and differences in cognitive behaviour using Sequential Mixed Media (SMM and Alternative Mixed Media (AMM approaches, and how switching between media may impact on design processes. Two participants with at least one-year’s professional design experience and a Bachelor of Design degree, and competence in both sketching and computer-aid design (CAD modelling participated in the study. Video recordings of participants working on different projects were coded using the Function-Behaviour-Structure (FBS coding scheme. Participants were also interviewed and their explanations about their switching behaviours were categorised into three types: S→C, S/C↹R and C→S. Preliminary results indicate that switching between media may influence how designers identify problems and develop solutions. In particular, two design issues were identified.  These relate to the FBS coding scheme, where structure (S and behaviour derived from structure (Bs, change to documentation (D after switching from sketching to CAD modelling (S→C. These switches make it possible for designers to integrate both approaches into one design medium and facilitate their design processes in AMM design environments.

  9. Improving Tools and Processes in Mechanical Design Collaboration

    Science.gov (United States)

    Briggs, Clark

    2009-01-01

    Cooperative product development projects in the aerospace and defense industry are held hostage to high cost and risk due to poor alignment of collaborative design tools and processes. This impasse can be broken if companies will jointly develop implementation approaches and practices in support of high value working arrangements. The current tools can be used to better advantage in many situations and there is reason for optimism that tool vendors will provide significant support.

  10. Software features and applications in process design, integration and operation

    Energy Technology Data Exchange (ETDEWEB)

    Dhole, V. [Aspen Tech Limited, Warrington (United Kingdom)

    1999-02-01

    Process engineering technologies and tools have evolved rapidly over the last twenty years. Process simulation/modeling, advanced process control, on-line optimisation, production planning and supply chain management are some of the examples of technologies that have rapidly matured from early commercial prototypes and concepts to established tools with significant impact on profitability of process industry today. Process Synthesis or Process Integration (PI) in comparison is yet to create its impact and still remains largely in the domain of few expert users. One of the key reasons as to why PI has not taken off is because the PI tools have not become integral components of the standard process engineering environments. On the last 15 years AspenTech has grown from a small process simulation tool provider to a large multinational company providing a complete suite of process engineering technologies and services covering process design, operation, planning and supply chain management. Throughout this period, AspenTech has acquired experience in rapidly evolving technologies from their early prototype stage to mature products and services. The paper outlines AspenTech`s strategy of integrating PI with other more established process design and operational improvement technologies. The paper illustrates the key elements of AspenTech`s strategy via examples of software development initiatives and services projects. The paper also outlines AspenTech`s future vision of the role of PI in process engineering. (au)

  11. Design of equipment used for high-level waste vitrification at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Vance, R.F.; Brill, B.A.; Carl, D.E.

    1997-06-01

    The equipment as designed, started, and operated for high-level radioactive waste vitrification at the West Valley Demonstration Project in western New York State is described. Equipment for the processes of melter feed make-up, vitrification, canister handling, and off-gas treatment are included. For each item of equipment the functional requirements, process description, and hardware descriptions are presented

  12. Designing equivalent semantic models for process creation

    NARCIS (Netherlands)

    P.H.M. America (Pierre); J.W. de Bakker (Jaco)

    1986-01-01

    textabstractOperational and denotational semantic models are designed for languages with process creation, and the relationships between the two semantics are investigated. The presentation is organized in four sections dealing with a uniform and static, a uniform and dynamic, a nonuniform and

  13. Hygienic Design in the Food Processing Industry

    DEFF Research Database (Denmark)

    Hilbert, Lisbeth Rischel; Hjelm, M.

    2001-01-01

    Bacterial adhesion and biofilm formation are of major concern in food production and processing industry. In 1998 a Danish co-operation programme under the title Centre for Hygienic Design was funded to combine the skills of universities, research institutes and industry to focus on the following...

  14. Facilitating an Elementary Engineering Design Process Module

    Science.gov (United States)

    Hill-Cunningham, P. Renee; Mott, Michael S.; Hunt, Anna-Blair

    2018-01-01

    STEM education in elementary school is guided by the understanding that engineering represents the application of science and math concepts to make life better for people. The Engineering Design Process (EDP) guides the application of creative solutions to problems. Helping teachers understand how to apply the EDP to create lessons develops a…

  15. Flexible Processing and the Design of Grammar

    Science.gov (United States)

    Sag, Ivan A.; Wasow, Thomas

    2015-01-01

    We explore the consequences of letting the incremental and integrative nature of language processing inform the design of competence grammar. What emerges is a view of grammar as a system of local monotonic constraints that provide a direct characterization of the signs (the form-meaning correspondences) of a given language. This…

  16. Safeguards planning in a plant design process

    International Nuclear Information System (INIS)

    Heinrich, L.A.

    1977-01-01

    The safeguards efforts for the partitioning fuel cycle are considered. Included in the discussion are the organization of the safeguards study, the development of safeguards criteria, the expression of these criteria as requirements for facility design, and some preliminary details of the implementation of these requirements in facility and process layout

  17. Synthesis and Design of Processing Networks

    DEFF Research Database (Denmark)

    Quaglia, Alberto; Sarup, Bent; Sin, Gürkan

    2012-01-01

    In this contribution, we propose an integrated business and engineering framework for synthesis and design of processing networks under uncertainty. In our framework, an adapted formulation of the transhipment problem is integrated with a superstructure, leading to a Stochastic Mixed Integer Non...... under market and technical uncertainty....

  18. Intelligent Controller Design for a Chemical Process

    OpenAIRE

    Mr. Glan Devadhas G; Dr.Pushpakumar S.

    2010-01-01

    Chemical process control is a challenging problem due to the strong on*line non*linearity and extreme sensitivity to disturbances of the process. Ziegler – Nichols tuned PI and PID controllers are found to provide poor performances for higher*order and non–linear systems. This paper presents an application of one*step*ahead fuzzy as well as ANFIS (adaptive*network*based fuzzy inference system) tuning scheme for an Continuous Stirred Tank Reactor CSTR process. The controller is designed based ...

  19. Artificial intelligence in process design and operation

    International Nuclear Information System (INIS)

    Sudduth, A.L.

    1988-01-01

    Artificial Intelligence (AI) has recently become prominent in the discussion of computer applications in the utility business. In order to assess this technology, a research project was performed to determine whether software development techniques based on AI could be used to facilitate management of information associated with the design of a generating station. The approach taken was the development of an expert system, using a relatively simple set of rules acting on a more complex knowledge base. A successful prototype for the application was developed and its potential extension to a production environment demonstrated. During the course of prototype development, other possible applications of AI in design engineering were discovered, and areas of particular interest selected for further investigation. A plan for AI R and D was formulated. That plan and other possible future work in AI are discussed

  20. The Process to Estimate Economical Benefits of Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    Jan Kosina

    2013-07-01

    Full Text Available This paper seeks to define the process for the continuous evaluation of the financial benefits during Six Sigma project life time. The financial criteria are critical success factors of a Six Sigma project. The process has been developed as part of the six sigma project monitoring in order to estimate proper allocation of the resources taking in account the expected project benefits as well as evaluationof real achievements. The evaluation of the finacial benefits based on the quality costs is not sufficient in the real life and has to be accomplished with key financial performance indicators of the business to visualize the results. The evaluation based on the savings seems to be too difficult especially for green belts. The early involvement of the finance department in the project definition as well as ongoing evaluation is key. The defined process has been applied to real business enviroment.

  1. Interactive Room Support for Complex and Distributed Design Projects

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Gundersen, Kristian Kroyer; Mogensen, Preben Holst

    2001-01-01

    We are investigating the design of digital 3D interaction technology embedded in a physical environment. We take as point of departure cemplex, collaborative industrial design projects involving heterogeneous sets of documents, and physical as well as digital 3D models. The paper introduces our...... interaction devices being experimented with in the interactive room environment. The interactive room technologies have all been designed with the requirement that they must seamlessly integrate both into the physical and into the digital work environment while providing new affordances for industrial design...

  2. Value Creation by Process-Oriented Project Management

    NARCIS (Netherlands)

    Geijtenbeek, W.; Eekelen, van A.L.M.; Kleine, A.J.; Favie, R.; Maas, G.J.; Milford, R.

    2007-01-01

    The start of a design process based on value creation requires a different approach and new models. The aim of this study is to provide insight into how a design process based on value creation can be initiated. The intended result of the study is the design of the of a collaboration model that can

  3. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  4. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  5. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  6. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    Science.gov (United States)

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  7. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  8. Valid knowledge for the professional design of large and complex design processes

    NARCIS (Netherlands)

    Aken, van J.E.

    2004-01-01

    The organization and planning of design processes, which we may regard as design process design, is an important issue. Especially for large and complex design-processes traditional approaches to process design may no longer suffice. The design literature gives quite some design process models. As

  9. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  10. Camera calibration based on the back projection process

    Science.gov (United States)

    Gu, Feifei; Zhao, Hong; Ma, Yueyang; Bu, Penghui

    2015-12-01

    Camera calibration plays a crucial role in 3D measurement tasks of machine vision. In typical calibration processes, camera parameters are iteratively optimized in the forward imaging process (FIP). However, the results can only guarantee the minimum of 2D projection errors on the image plane, but not the minimum of 3D reconstruction errors. In this paper, we propose a universal method for camera calibration, which uses the back projection process (BPP). In our method, a forward projection model is used to obtain initial intrinsic and extrinsic parameters with a popular planar checkerboard pattern. Then, the extracted image points are projected back into 3D space and compared with the ideal point coordinates. Finally, the estimation of the camera parameters is refined by a non-linear function minimization process. The proposed method can obtain a more accurate calibration result, which is more physically useful. Simulation and practical data are given to demonstrate the accuracy of the proposed method.

  11. 44 CFR 78.10 - Project grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  12. Project INOVEMAR: Innovation in Sea Produce Processment

    Directory of Open Access Journals (Sweden)

    Maria Alberta Araújo

    2014-06-01

    Following information conveyed by Docapesca, the less valued species captured in the region are different mackerel species, Atlantic horse mackerel, pout, octopus and mullet. Mackerel and Atlantic horse mackerel, due to their high subcutaneous fat were used for smoking and for the production of canned smoked fillets and patés, with different sauces.The smoking process included: washing fresh fish, 30 minutes immersion in a 80º brine, followed by dripping and drying for 48h. Smoking was carried out at 70ºC during 3h, with a final stage at 90ºC. Several paté formulations were developed with mackerel and atlantic horse mackerel, with different types and quantities of ingredients and flavourings to obtain different products. Special attention was paid to the amounts of thickeners and emulsifiers to attain a pleasant spread ability. All preparations were sterilized for 15 minutes at 121ºC. A sensory panel with 10 judges and a consumer panel with 59 consumers were used to test the developed products. The 59 consumers (17-25 years of age classified smoked products as moderately pleasant. 82% of the consumers tested expressed willingness to purchase the product. In what concerns patés, sensory judges as well as consumers rated the majority of products as very good in the several parameters under evaluation, indication that there is a great potential for these type of commodities. Several fish species are being studied for pre-cooking conservation. In all the cases studied, typical Portuguese cuisine is being used, followed by rapid chilling and packing with modified atmospheres. Preparations, preservation and subsequent consumption are being carried out at the school's canteen. The results obtained until now show that low commercial valued species can be used with success, providing some culinary expertise is added. This is a very important aspect since, transferring this technology to industry, may lead to the development of new products and help an easy flow of

  13. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  14. Design considerations for a servo optical projection system

    Science.gov (United States)

    Nadalsky, Michael; Allen, Daniel; Bien, Joseph

    1987-01-01

    The present servooptical projection system (SOPS) furnishes 'out-the-window' scenery for a pilot-training flight simulator; attention is given to the parametric tradeoffs made in the SOPS' optical design, as well as to its mechanical packaging and the servonetwork performance of the unit as integrated into a research/training helicopter flight simulator. The final SOPS configuration is a function of scan head design, assembly modularity, image deterioration method, and focal lengths and relative apertures.

  15. Project Portal User-Centered Design and Engineering Report

    Science.gov (United States)

    2016-06-01

    TECHNICAL REPORT 3013 June 2016 Project Portal User-Centered Design and Engineering Report Deborah Gill-Hesselgrave Veronica Higgins Sarah...Design and Engineering Branch Under authority of Chris Raney, Head Command and Control Technology and Experiments Division iii EXECUTIVE...navy.mil  Christian Szatkowski christian.szatkowski@navy.mil  Roni Higgins roni.higgins@navy.mil  Jake Viraldo jacob.viraldo@navy.mil B

  16. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  17. Delft Aerospace Design Projects 2016 : Inspring Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2016-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2015 and the Spring Design Synthesis Exercise of 2016, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  18. Delft Aerospace Design Projects 2015 : Challenging New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2015-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2014 and the Spring Design Synthesis Exercise of 2015, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  19. Delft Aerospace Design Projects 2014 : New Designs in Aeronautics, Astronautics and Wind Energy

    NARCIS (Netherlands)

    Melkert, J.A.

    2014-01-01

    This book presents an overview of the results of the Fall Design Synthesis Exercise 2013 and the Spring Design Synthesis Exercise of 2014, based on summaries of each of the projects. The Design Synthesis Exercise Coordination Committee, responsible for the organisation and execution of the exercise,

  20. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  1. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  2. Development and design application of cerium (IV) decontamination process

    International Nuclear Information System (INIS)

    Bray, L.A.; Seay, J.M.

    1988-01-01

    A simple and effective method was developed for decontamination of high-level waste canisters. This method of chemical decontamination is applicable to a wide variety of contaminated equipment found in the nuclear industry. Conceptual design of the cerium [Ce(IV)] decontamination process equipment has been completed for the West Valley Demonstration project (WVDP) vitrification facility. This remote equipment, which is the first engineering scale application of this technology, will remove surface contamination from stainless-steel (SS) containers containing high-level waste (HLW) glass prior to placing them into temporary storage and ultimate shipment to a U.S. Department of Energy (DOE) repository for disposal. The objective of the development and design study was to identify an effective chemical process and to design equipment to decontaminate the HLW glass canisters to limits that meet U.S. DOE requirements. The equipment includes canister-capping and smear stations in addition to the decontamination module and associated services

  3. Development and design application of cerium (IV) decontamination process

    International Nuclear Information System (INIS)

    Bray, L.A.; Seay, J.M.

    1988-10-01

    A simple and effective method was developed for decontamination of high-level waste canisters. This method of chemical decontamination is applicable to a wide variety of contaminated equipment found in the nuclear industry. Conceptual design of the cerium [Ce(IV)] decontamination process equipment has been completed for the West Valley Demonstration Project (WVDP) vitrification facility. This remote equipment, which is the first engineering scale application of this technology, will remove surface contamination from stainless-steel (SS) containers containing high-level waste (HLW) glass prior to placing them into temporary storage and ultimate shipment to a US Department of Energy (DOE) repository for disposal. The objective of the development and design study was to identify an effective chemical process and to design equipment to decontaminate the HLW glass canisters to limits that meet USDOE requirements. The equipment includes canister-capping and smear stations in addition to the decontamination module and associated services. 2 refs., 1 fig

  4. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  5. Biorefinery plant design, engineering and process optimisation

    DEFF Research Database (Denmark)

    Holm-Nielsen, Jens Bo; Ehimen, Ehiazesebhor Augustine

    2014-01-01

    Before new biorefinery systems can be implemented, or the modification of existing single product biomass processing units into biorefineries can be carried out, proper planning of the intended biorefinery scheme must be performed initially. This chapter outlines design and synthesis approaches...... applicable for the planning and upgrading of intended biorefinery systems, and includes discussions on the operation of an existing lignocellulosic-based biorefinery platform. Furthermore, technical considerations and tools (i.e., process analytical tools) which could be applied to optimise the operations...... of existing and potential biorefinery plants are elucidated....

  6. Design of Separation Processes with Ionic Liquids

    DEFF Research Database (Denmark)

    Peng-noo, Worawit; Kulajanpeng, Kusuma; Gani, Rafiqul

    2015-01-01

    A systematic methodology for screening and designing of Ionic Liquid (IL)-based separation processes is proposed and demonstrated using several case studies of both aqueous and non-aqueous systems, for instance, ethanol + water, ethanol + hexane, benzene + hexane, and toluene + methylcyclohexane....... The best four ILs of each mixture are [mmim][dmp], [emim][bti], [emim][etso4] and [hmim][tcb], respectively. All of them were used as entrainers in the extractive distillation. A process simulation of each system was carried out and showed a lower both energy requirement and solvent usage as compared...

  7. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Energy Technology Data Exchange (ETDEWEB)

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  8. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  9. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  10. The ZAP Project: Designing Interactive Computer Tools for Learning Psychology

    Science.gov (United States)

    Hulshof, Casper; Eysink, Tessa; de Jong, Ton

    2006-01-01

    In the ZAP project, a set of interactive computer programs called "ZAPs" was developed. The programs were designed in such a way that first-year students experience psychological phenomena in a vivid and self-explanatory way. Students can either take the role of participant in a psychological experiment, they can experience phenomena themselves,…

  11. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  12. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  13. Design Criteria for Process Wastewater Pretreatment Facilities

    Science.gov (United States)

    1988-05-01

    Stripping Column H13 ’Re Purpose: The purpose of this report, is to provide design criteria for pretreatment needs for ’ I. INTRODUCTION ’". discharge of...which a portion of the vessel is filled with packing. Packing materials vary from corrugated steel to bundles of fibers (Langdon et al., 1972) to beds...concentration(s) using Table 20. Wastewater treatability studies should be considered as a process-screening tool for all wastewater streams for

  14. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  15. Sunray project - A long-term, nationwide educational process

    International Nuclear Information System (INIS)

    Nikula, Anneli

    2000-01-01

    The Sunray project is a nationwide educational process coordinated by the Economic Information Bureau (TaT Group) for ninth graders in Finnish comprehensive schools. The project aims at giving thorough and versatile information on radiation within the framework of various subjects (physics, biology, domestic science, history, European languages, mother tongue, health education etc.). The Sunray project covers all ninth graders of the existing 600 Finnish comprehensive schools; in all involving some 65 000 pupils. The project, which has been repeated five times, was initiated as part of the European Science and Technology week in 1995. During the first two years it was strongly linked with the science week as natural sciences were seen as a good framework for the chosen perspective. Since 1997, the project has been run as an event in its own right. The project has applied the method of processing integrated groups of themes, which is an objective of the comprehensive school system and the experimental method of science. As schools make their own decisions about the educational programmes to be adopted every semester, the project has been marketed to schools at the beginning of May. The TaT Group has arranged marketing events in some 10 localities in Finland. The Economic Information Bureau of Finland coordinates the project and in 1995-2000 the Radiation and Nuclear Safety Authority (STUK), the Finnish Energy Industries' Federation, the Finnish Electricity Association, Fortum Oyj and Teollisuuden Voima Oy have participated in the project

  16. Managing projects for life cycle success : perfecting the process

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada PipeLines Ltd., Calgary, AB (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada)

    2004-07-01

    This paper presented a historical summary of traditional project management along with a discussion on the project management and development philosophy that can be used in a large infrastructure company that develops and operates its own projects and facilities. Two case studies from the experiences of TransCanada Pipelines Limited were also presented. It was suggested that companies seeking a first-rate reputation must maintain a long-term focus with emphasis on the improvement of the total process and harmony with the environment and community. This paper explained how project managers can create balance between the proponents, stakeholders, participants and the people and the environment while ensuring a cost effective quality product over time. Successful project managers were shown to understand and manage the components of scope, time, cost, quality, human resources, communication, risk, purchasing, safety and harmony with the community. Project development from the perspective of an owner-operator was presented with reference to consistency in approach and the decision making process. It was concluded that although project managers should focus on controlling and minimizing capital expenditures during project engineering and construction, the many elements that contribute to a project's value should also be recognized. 10 refs., 6 figs.

  17. Process simulation and parametric modeling for strategic project management

    CERN Document Server

    Morales, Peter J

    2013-01-01

    Process Simulation and Parametric Modeling for Strategic Project Management will offer CIOs, CTOs and Software Development Managers, IT Graduate Students an introduction to a set of technologies that will help them understand how to better plan software development projects, manage risk and have better insight into the complexities of the software development process.A novel methodology will be introduced that allows a software development manager to better plan and access risks in the early planning of a project.  By providing a better model for early software development estimation and softw

  18. Processing a programming handbook for visual designers and artists

    CERN Document Server

    Reas, Casey

    2014-01-01

    The visual arts are rapidly changing as media moves into the web, mobile devices, and architecture. When designers and artists learn the basics of writing software, they develop a new form of literacy that enables them to create new media for the present, and to imagine future media that are beyond the capacities of current software tools. This book introduces this new literacy by teaching computer programming within the context of the visual arts. It offers a comprehensive reference and text for Processing (www.processing.org), an open-source programming language that can be used by students, artists, designers, architects, researchers, and anyone who wants to program images, animation, and interactivity. Written by Processing's cofounders, the book offers a definitive reference for students and professionals. Tutorial chapters make up the bulk of the book; advanced professional projects from such domains as animation, performance, and installation are discussed in interviews with their creators. This secon...

  19. Model-Based Integrated Process Design and Controller Design of Chemical Processes

    DEFF Research Database (Denmark)

    Abd Hamid, Mohd Kamaruddin Bin

    that is typically formulated as a mathematical programming (optimization with constraints) problem is solved by the so-called reverse approach by decomposing it into four sequential hierarchical sub-problems: (i) pre-analysis, (ii) design analysis, (iii) controller design analysis, and (iv) final selection......This thesis describes the development and application of a new systematic modelbased methodology for performing integrated process design and controller design (IPDC) of chemical processes. The new methodology is simple to apply, easy to visualize and efficient to solve. Here, the IPDC problem...... are ordered according to the defined performance criteria (objective function). The final selected design is then verified through rigorous simulation. In the pre-analysis sub-problem, the concepts of attainable region and driving force are used to locate the optimal process-controller design solution...

  20. New nuclear plant design and licensing process

    International Nuclear Information System (INIS)

    Luangdilok, W.

    1996-01-01

    This paper describes latest developments in the nuclear power reactor technology with emphasis on three areas: (1) the US technology of advanced passive light water reactors (AP600 and S BWR), (2) regulatory processes that certify their safety, and (3) current engineering concerns. The goal is to provide and insight of how the government's regulatory agency guarantees public safety by looking into how new passive safety features were designed and tested by vendors and how they were re-evaluated and retested by the US NRC. The paper then discusses the US 1989 nuclear licensing reform (10 CFR Part 52) whose objectives are to promote the standardization of nuclear power plants and provide for the early and definitive resolution of site and design issues before plants are built. The new licensing process avoids the unpredictability nd escalated construction cost under the old licensing process. Finally, the paper summarizes engineering concerns found in current light water reactors that may not go away in the new design. The concerns are related the material and water chemistry technology in dealing with corrosion problems in water-cooled nuclear reactor systems (PWRs and BWRs). These engineering concerns include core shroud cracking (BWRs), jet pump hold-down beam cracking (BWRs), steam generator tube stress corrosion cracking (PWR)

  1. Barriers and Challenges in the Integrated Design Process Approcach

    DEFF Research Database (Denmark)

    Knudstrup, Mary-Ann

    2006-01-01

    ABSTRACT: In the future, it will be a huge challenge to make sustainable building design by using a more holistic and innovative approach in order to be able to decrease or reduce the use of energy for heating and cooling in new building projects. This is seen in the perspective of the Kyoto agre....... It also describes the barriers and the challenges that must be overcome when trying to cross the borders between the two fields of engineering and architecture to design sustainable architecture....... agreement for reducing the global heating. This paper will briefly present the method of the Integrated Design Process, IDP [1]. It describes the background and means for developing a new method for designing integrated architecture in an interdisciplinary approach between architecture and engineering...

  2. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  3. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  4. User-inspired design methodology using Affordance Structure Matrix (ASM for construction projects

    Directory of Open Access Journals (Sweden)

    Maheswari J. Uma

    2017-01-01

    Full Text Available Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost among others. The existing design theories and practice are primarily based on functional requirements. Function-based design deals with design of artifact alone, which may yield favourable or unfavourable consequences with the design artifact. However, incorporating other interactions such as interactions between user & designer is necessary for optimised end-result. Hence, the objective of this research work is to devise a systematic design methodology considering all the three interactions among users, designers and artefacts for improved design efficiency. In this study, it has been attempted to apply the theory of affordances in a case project that involves the design of an offshore facility. A step-by-step methodology for developing Affordance Structure Matrix (ASM, which integrates House of Quality (HOQ and Design Structure Matrix (DSM, is proposed that can effectively capture the user requirements. HOQ is a popular quality management tool for capturing client requirements and DSM is a matrix-based tool that can capture the interdependency among the design entities. The proposed methodology utilises the strengths of both the tools, as DSM compliments HOQ in the process. In this methodology, different affordances such as AUA (Artifact-User-Affordance, AAA (Artifact-Artifact-Affordance and DDA (Designer-Designer-Affordance are captured systematically. Affordance is considered to be user-driven in this context that is in contrast to prevailing design

  5. REQUIREMENTS PROCESSING TOOLS AND THE BUILDING DESIGNERS MOTIVATION ON USE

    Directory of Open Access Journals (Sweden)

    Camila Pegoraro

    2017-04-01

    Full Text Available The successful development of projects requires, among other conditions, the ability to process requirements. In the construction literature, researchers have figured out that human difficulties was often at the root of Requirements Processing (RP problems throughout the design phases, and that the employment of tools could be a key factor for RP implementation. To check these outcomes and to look at how current practitioners behave in relation to the RP tools, an exploratory case study was conducted with a building design team from a public university. The aim of this paper was to investigate the perception of benefits and the motivation of designers regarding the RP tools. The results indicated that 42% of the participants are highly motivated to use new tools and that they have more interest in tools that deal directly with design activities than in those focused on data. Validation tools aroused interest as the most useful tools for designers. 66,7% of the participants mentioned that the tools can make the design process clearer, and that training and adaptation are crucial to promote acceptance and commitment to RP. The main contribution is the indication of gaps for further research and for tools improvement from the designers’ perspective.

  6. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  7. Sampling design for use by the soil decontamination project

    International Nuclear Information System (INIS)

    Rutherford, D.W.; Stevens, J.R.

    1981-01-01

    This report proposes a general approach to the problem and discusses sampling of soil to map the contaminated area and to provide samples for characterizaton of soil components and contamination. Basic concepts in sample design are reviewed with reference to environmental transuranic studies. Common designs are reviewed and evaluated for use with specific objectives that might be required by the soil decontamination project. Examples of a hierarchial design pilot study and a combined hierarchial and grid study are proposed for the Rocky Flats 903 pad area

  8. Design Methodology of Process Layout considering Various Equipment Types for Large scale Pyro processing Facility

    International Nuclear Information System (INIS)

    Yu, Seung Nam; Lee, Jong Kwang; Lee, Hyo Jik

    2016-01-01

    At present, each item of process equipment required for integrated processing is being examined, based on experience acquired during the Pyropocess Integrated Inactive Demonstration Facility (PRIDE) project, and considering the requirements and desired performance enhancement of KAPF as a new facility beyond PRIDE. Essentially, KAPF will be required to handle hazardous materials such as spent nuclear fuel, which must be processed in an isolated and shielded area separate from the operator location. Moreover, an inert-gas atmosphere must be maintained, because of the radiation and deliquescence of the materials. KAPF must also achieve the goal of significantly increased yearly production beyond that of the previous facility; therefore, several parts of the production line must be automated. This article presents the method considered for the conceptual design of both the production line and the overall layout of the KAPF process equipment. This study has proposed a design methodology that can be utilized as a preliminary step for the design of a hot-cell-type, large-scale facility, in which the various types of processing equipment operated by the remote handling system are integrated. The proposed methodology applies to part of the overall design procedure and contains various weaknesses. However, if the designer is required to maximize the efficiency of the installed material-handling system while considering operation restrictions and maintenance conditions, this kind of design process can accommodate the essential components that must be employed simultaneously in a general hot-cell system

  9. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    International Nuclear Information System (INIS)

    Piros, Attila; Veres, Gábor

    2013-01-01

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution

  10. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Piros, Attila, E-mail: attila.piros@gt3.bme.hu [Department of Machine and Product Design, Budapest University of Technology and Economics, Budapest (Hungary); Veres, Gábor [Department of Plasma Physics, Wigner Research Centre for Physics, Hungarian Academy of Sciences, Budapest (Hungary)

    2013-10-15

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution.

  11. A Case Study of User-Centred Design in Four Swiss RUP Projects

    Directory of Open Access Journals (Sweden)

    Ljiljana Vukelja

    2010-01-01

    Full Text Available We analysed four Rational Unified Process (RUP projects in Switzerland that identified themselves as following a user-centred approach. Grounded theory served for analysis of 12 interviews with software developers, project managers, and UI specialists. For each professional group we analysed their work context, motivations, work practices, and strategies used to overcome the obstacles to user-centred design. Results show that end users did not participate in the projects. Instead of working directly with end users, participants used data from marketing research or consulted colleagues from other departments. Prototypes played an important role. We suggest the following remedies: (1 developing methods for easy integration of existing company knowledge about products with usability features, (2 professionalising UI design by educating project stakeholders in standard UI design, (3 creating an approved pool of company's personas for UI specialists' work, and (4 educating customers on their right to get good user interfaces.

  12. Waste receiving and processing facility module 1, detailed design report

    International Nuclear Information System (INIS)

    1993-10-01

    WRAP 1 baseline documents which guided the technical development of the Title design included: (a) A/E Statement of Work (SOW) Revision 4C: This DOE-RL contractual document specified the workscope, deliverables, schedule, method of performance and reference criteria for the Title design preparation. (b) Functional Design Criteria (FDC) Revision 1: This DOE-RL technical criteria document specified the overall operational criteria for the facility. The document was a Revision 0 at the beginning of the design and advanced to Revision 1 during the tenure of the Title design. (c) Supplemental Design Requirements Document (SDRD) Revision 3: This baseline criteria document prepared by WHC for DOE-RL augments the FDC by providing further definition of the process, operational safety, and facility requirements to the A/E for guidance in preparing the design. The document was at a very preliminary stage at the onset of Title design and was revised in concert with the results of the engineering studies that were performed to resolve the numerous technical issues that the project faced when Title I was initiated, as well as, by requirements established during the course of the Title II design

  13. The Iterative Design Process in Research and Development: A Work Experience Paper

    Science.gov (United States)

    Sullivan, George F. III

    2013-01-01

    The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.

  14. Biotechnology by Design: An Introductory Level, Project-Based, Synthetic Biology Laboratory Program for Undergraduate Students†

    OpenAIRE

    Beach, Dale L.; Alvarez, Consuelo J.

    2015-01-01

    Synthetic biology offers an ideal opportunity to promote undergraduate laboratory courses with research-style projects, immersing students in an inquiry-based program that enhances the experience of the scientific process. We designed a semester-long, project-based laboratory curriculum using synthetic biology principles to develop a novel sensory device. Students develop subject matter knowledge of molecular genetics and practical skills relevant to molecular biology, recombinant DNA techniq...

  15. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  16. AUTOMATION DESIGN FOR MONORAIL - BASED SYSTEM PROCESSES

    Directory of Open Access Journals (Sweden)

    Bunda BESA

    2016-12-01

    Full Text Available Currently, conventional methods of decline development put enormous cost pressure on the profitability of mining operations. This is the case with narrow vein ore bodies where current methods and mine design of decline development may be too expensive to support economic extraction of the ore. According to studies, the time it takes to drill, clean and blast an end in conventional decline development can be up to 224 minutes. This is because once an end is blasted, cleaning should first be completed before drilling can commence, resulting in low advance rates per shift. Improvements in advance rates during decline development can be achieved by application of the Electric Monorail Transport System (EMTS based drilling system. The system consists of the drilling and loading components that use monorail technology to drill and clean the face during decline development. The two systems work simultaneously at the face in such a way that as the top part of the face is being drilled the pneumatic loading system cleans the face. However, to improve the efficiency of the two systems, critical processes performed by the two systems during mining operations must be automated. Automation increases safety and productivity, reduces operator fatigue and also reduces the labour costs of the system. The aim of this paper is, therefore, to describe automation designs of the two processes performed by the monorail drilling and loading systems during operations. During automation design, critical processes performed by the two systems and control requirements necessary to allow the two systems execute such processes automatically have also been identified.

  17. Orienting and Onboarding Clinical Nurse Specialists: A Process Improvement Project.

    Science.gov (United States)

    Garcia, Mayra G; Watt, Jennifer L; Falder-Saeed, Karie; Lewis, Brennan; Patton, Lindsey

    Clinical nurse specialists (CNSs) have a unique advanced practice role. This article describes a process useful in establishing a comprehensive orientation and onboarding program for a newly hired CNS. The project team used the National Association of Clinical Nurse Specialists core competencies as a guide to construct a process for effectively onboarding and orienting newly hired CNSs. Standardized documents were created for the orientation process including a competency checklist, needs assessment template, and professional evaluation goals. In addition, other documents were revised to streamline the orientation process. Standardizing the onboarding and orientation process has demonstrated favorable results. As of 2016, 3 CNSs have successfully been oriented and onboarded using the new process. Unique healthcare roles require special focus when onboarding and orienting into a healthcare system. The use of the National Association of Clinical Nurse Specialists core competencies guided the project in establishing a successful orientation and onboarding process for newly hired CNSs.

  18. Business Process Improvement in Organizational Design of E-Government Services.

    NARCIS (Netherlands)

    O.F. Aydinli; S. Brinkkemper; J.P.P. Ravesteijn

    2009-01-01

    This paper describes a business process and organizational re-design and implementation project for an e-government service organization. In this project the initial process execution time of a Virtual Private Network (VPN) connection request has been reduced from some 60 days to 2 days. This has

  19. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  20. The design and development of Project Warrior equipment

    International Nuclear Information System (INIS)

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  1. AIRCRAFT POWER SUPPLY SYSTEM DESIGN PROCESS AS AN AUTOMATION OBJECT

    Directory of Open Access Journals (Sweden)

    Boris V. Zhmurov

    2018-01-01

    Full Text Available The process of designing aviation electrical power systems (EPS is related to the need to fulfill a number of requirements of normative and technical documents and to conduct a large number of calculations. Experience has shown that it is not possible to obtain reliable initial data on the nature and magnitude of electricity consumption by electricity receivers (end users at the early stages of design. The composition of the electric power receivers and the power consumption of electricity during the design process are repeatedly changed. This leads to the need to repeatedly perform tasks related to the synthesis of primary and secondary systems of generation and calculation.The desire to improve the efficiency of EPS led to the emergence of new standardized types of electrical energy - 270 V DC and 380 V three-phase AC of stable and unstable frequency. It follows that it is possible to implement a rather large number of options for EPS structures, and there may be several secondary EPS or, in general, EPS of a third or higher level.The lack of ready-made aviation energy converters implies the impossibility of using ready-made components, and the development of specific devices should be coordinated with the development of EPS. In this case, one of the results of EPS design will be a set of requirements for the devices and units of the EPS projected.In any case, the design process for EPS aircraft requires a lot of iterations that take into account the change in both the raw data and the constraints on the EPS elements and the design process itself.The traditional approach to the design of EPS aircraft, assuming the knowledge of the designer of dozens of GOSTs (State All-Union standards and OSTs (All-Union standarts regulating the design stages of EPS, as well as the existence of standard EPS structures, from which a specific choice is made, is practically impossible at present. The only way to consciously approach the problem of designing EPS

  2. Forging process design for risk reduction

    Science.gov (United States)

    Mao, Yongning

    In this dissertation, forging process design has been investigated with the primary concern on risk reduction. Different forged components have been studied, especially those ones that could cause catastrophic loss if failure occurs. As an effective modeling methodology, finite element analysis is applied extensively in this work. Three examples, titanium compressor disk, superalloy turbine disk, and titanium hip prosthesis, have been discussed to demonstrate this approach. Discrete defects such as hard alpha anomalies are known to cause disastrous failure if they are present in those stress critical components. In this research, hard-alpha inclusion movement during forging of titanium compressor disk is studied by finite element analysis. By combining the results from Finite Element Method (FEM), regression modeling and Monte Carlo simulation, it is shown that changing the forging path is able to mitigate the failure risk of the components during the service. The second example goes with a turbine disk made of superalloy IN 718. The effect of forging on microstructure is the main consideration in this study. Microstructure defines the as-forged disk properties. Considering specific forging conditions, preform has its own effect on the microstructure. Through a sensitivity study it is found that forging temperature and speed have significant influence on the microstructure. In order to choose the processing parameters to optimize the microstructure, the dependence of microstructure on die speed and temperature is thoroughly studied using design of numerical experiments. For various desired goals, optimal solutions are determined. The narrow processing window of titanium alloy makes the isothermal forging a preferred way to produce forged parts without forging defects. However, the cost of isothermal forging (dies at the same temperature as the workpiece) limits its wide application. In this research, it has been demonstrated that with proper process design, the die

  3. Making Education: Governance by Design: Notes from a book project

    DEFF Research Database (Denmark)

    Rasmussen, Lisa Rosén

    2017-01-01

    in and through material school designs: from the material and aesthetic language of schooling to the design of the built environment, from spatial organisation to the furnishing and equipment of classrooms and from technologies of regulation to the incorporation of tools of learning. Over the last decades......, governance as a concept developed within political science has gained a growing popularity in an increased number of research fields, also within the field of educational research (Amos 2010). Recent theories on governance open up to look at governance beyond political decision-making processes and state...... in the book focus on design processes and on designers/architects and people involved in the planning of school design as well as on school leaders, teachers and pupils adopting, inhabiting and re-shaping them in everyday school life. By stressing the processual aspects of school designs, the book puts...

  4. Applying operating experience to design the CANDU 3 process

    International Nuclear Information System (INIS)

    Harris, D.S.; Hinchley, E.M.; Pauksens, J.; Snell, V.; Yu, S.K.W.

    1991-01-01

    personnel in the early design stages of a project. This has been accomplished in a variety of ways for the CANDU 3 design, including visits to nuclear utilities, exchange of staff with utilities, and hiring of utility staff as consultants. Input from equipment manufacturers is also a key item, particularly in the area of the technical specifications that are produced by designers. CANDU 3 approached this by requesting comments on technical specifications from traditional or established suppliers and by pre-selecting major equipment suppliers in advance - to permit early discussions on equipment details, and by giving consulting contracts to suppliers to establish major design parameters. Design reviews have long been a traditional part of the design process. For the CANDU 3 participation of utility representatives has been actively solicited in order to incorporate their comments at an early stage. Some obvious benefits of this approach were in the areas of operational testing, maintainability, and that of the fuel channel design. The application of a more formal human factors program to CANDU 3 design has led to the development of a functional design methodology which requires designers in key areas to evolve their designs from operating procedures, and thus produce designs which are easier for operators and maintainers. This is the reverse of the traditional approach where operating procedures produced after design completion have had to adapt to design features. The paper includes an outline of the application of the functional design methodology to the design of an advanced control centre for CANDU 3. It also shows how operating and maintainability considerations have been factored in at all design stages based on inputs from operating utilities

  5. Applying operating experience to design the CANDU 3 process

    Energy Technology Data Exchange (ETDEWEB)

    Harris, D S; Hinchley, E M; Pauksens, J; Snell, V; Yu, S K.W. [AECL-CANDU, Ontario (Canada)

    1991-04-01

    personnel in the early design stages of a project. This has been accomplished in a variety of ways for the CANDU 3 design, including visits to nuclear utilities, exchange of staff with utilities, and hiring of utility staff as consultants. Input from equipment manufacturers is also a key item, particularly in the area of the technical specifications that are produced by designers. CANDU 3 approached this by requesting comments on technical specifications from traditional or established suppliers and by pre-selecting major equipment suppliers in advance - to permit early discussions on equipment details, and by giving consulting contracts to suppliers to establish major design parameters. Design reviews have long been a traditional part of the design process. For the CANDU 3 participation of utility representatives has been actively solicited in order to incorporate their comments at an early stage. Some obvious benefits of this approach were in the areas of operational testing, maintainability, and that of the fuel channel design. The application of a more formal human factors program to CANDU 3 design has led to the development of a functional design methodology which requires designers in key areas to evolve their designs from operating procedures, and thus produce designs which are easier for operators and maintainers. This is the reverse of the traditional approach where operating procedures produced after design completion have had to adapt to design features. The paper includes an outline of the application of the functional design methodology to the design of an advanced control centre for CANDU 3. It also shows how operating and maintainability considerations have been factored in at all design stages based on inputs from operating utilities.

  6. Analysis of architect’s performance indicators in project delivery process

    Science.gov (United States)

    Marisa, A.

    2018-03-01

    Architect as a professional in the construction industry should possess a good performance in project delivery process. As a design professional, architect has an important role to ensure that the process is well-conducted by delivering a high-quality product for the clients. Thus, analyzing architect’s performance indicators is crucial in the project delivery process. This study aims to analyze the relative importance of architect performance indicators in project delivery process among registered architects in North Sumatera, Indonesia. A total of five indicators that measure architect performance in project delivery process were identified and 110 completed questionnaires were obtained and used for data analysis. A relative importance index is used to rank the relative importance of architect performance indicators. Results indicate that focus on the clients is the most important indicator of architect performance in project delivery process. This study demonstrates project communication as one of crucial indicators perceived by the architects for measuring their performance, and fills a knowledge gap on the importance of identifying the most important indicator for measuring architect performance from their own perspectives which previous studies have overlooked to improve performance assessment in project delivery process.

  7. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  8. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  9. Baseline process description for simulating plutonium oxide production for precalc project

    Energy Technology Data Exchange (ETDEWEB)

    Pike, J. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-10-26

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as well as process and facility design details necessary for multi-scale, multi-physics models are provided.

  10. Design of MPU based process monitoring instrument

    International Nuclear Information System (INIS)

    Ahmed, Z.; Qamar, R.; Majid, B.

    1995-03-01

    A display sub-system (DSS) for a process variable like flow is designed around Intel 8088 microprocessor. It displays the current value of a process variable but average and accumulated value display is manually selectable. The display consists of 6 units of seven segment display and accuracy up to 2 nd place of decimal is achieved. The engineering units are indicated by the LEDs. The control software is developed in assembler and burnt in a EPROM. The maximum value of the display is 9999.99 K. liter and that of time is 99 days 23 hours and 59 minutes. Sampling period is 1 second. Data acquisition is done using Polling technique. (author)

  11. Sustainable process design & analysis of hybrid separations

    DEFF Research Database (Denmark)

    Kumar Tula, Anjan; Befort, Bridgette; Garg, Nipun

    2016-01-01

    Distillation is an energy intensive operation in chemical process industries. There are around 40,000 distillation columns in operation in the US, requiring approximately 40% of the total energy consumption in US chemical process industries. However, analysis of separations by distillation has...... shown that more than 50% of energy is spent in purifying the last 5-10% of the distillate product. Membrane modules on the other hand can achieve high purity separations at lower energy costs, but if the flux is high, it requires large membrane area. A hybrid scheme where distillation and membrane...... modules are combined such that each operates at its highest efficiency, has the potential for significant energy reduction without significant increase of capital costs. This paper presents a method for sustainable design of hybrid distillation-membrane schemes with guaranteed reduction of energy...

  12. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  13. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  14. A design method for process design kit based on an SMIC 65 nm process

    International Nuclear Information System (INIS)

    Luo Haiyan; Chen Lan; Yin Minghui

    2010-01-01

    The frame structure of a process design kit (PDK) is described in detail, and a practical design method for PDK is presented. Based on this method, a useful SMIC 65 nm PDK has been successfully designed and realized, which is applicable to native EDA software of Zeni. The design process and difficulties of PDK are introduced by developing and analyzing these parameterized cell (Pcell) devices (MOS, resistor, etc.). A structured design method was proposed to implement Pcell, which makes thousands upon thousands of source codes of Pcell concise, readable, easy-to-upkeep and transplantable. Moreover, a Pcase library for each Pcell is designed to verify the Pcell in batches. By this approach, the Pcell can be verified efficiently and the PDK will be more reliable and steady. In addition, the component description format parameters and layouts of the Pcell are optimized by adding flexibility and improving performance, which benefits analog and custom IC designers to satisfy the demand of design. Finally, the SMIC 65 nm PDK was applied to IC design. The results indicate that the SMIC 65 nm PDK is competent to support IC design. (semiconductor integrated circuits)

  15. Project design of an open pit colliery in Terkidag, Turkey

    Directory of Open Access Journals (Sweden)

    H. Kose

    2010-10-01

    Full Text Available In this manuscript, first of all, the status of Turkey in terms of energy production and consumption is given and the need to relyon domestic sources, namely lignite deposits, is emphasized rather than importing fuels from abroad. Then, a thorough literature workconcerning open pit design and production planning is explained in detail. On this basis, the project design and production planningof Tekirdag-Saray open pit colliery are conducted. According to the selected production technique, machinery-equipment that willbe utilized in the coal winning system is determined and in the final part, the investment cost and unit production cost regardingthe project are computed and the importance of constructing a power plant in the region operating with domestic fuels is expressed.

  16. Design and Development of a User Interface for the Dynamic Model of Software Project Management.

    Science.gov (United States)

    1988-03-01

    rectory of the user’s choice for future...the last choice selected. Let us assume for the sake of this tour that the user has selected all eight choices . ESTIMATED ACTUAL PROJECT SIZE DEFINITION...manipulation of varaibles in the * •. TJin~ca model "h ... ser Inter ace for the Dynamica model was designed b in iterative process of prototyping

  17. Practicing Learner-Centered Teaching: Pedagogical Design and Assessment of a Second Life Project

    Science.gov (United States)

    Schiller, Shu Z.

    2009-01-01

    Guided by the principles of learner-centered teaching methodology, a Second Life project is designed to engage students in active learning of virtual commerce through hands-on experiences and teamwork in a virtual environment. More importantly, an assessment framework is proposed to evaluate the learning objectives and learning process of the…

  18. Developing Physics Concepts through Hands-On Problem Solving: A Perspective on a Technological Project Design

    Science.gov (United States)

    Hong, Jon-Chao; Chen, Mei-Yung; Wong, Ashley; Hsu, Tsui-Fang; Peng, Chih-Chi

    2012-01-01

    In a contest featuring hands-on projects, college students were required to design a simple crawling worm using planning, self-monitoring and self-evaluation processes to solve contradictive problems. To enhance the efficiency of problem solving, one needs to practice meta-cognition based on an application of related scientific concepts. The…

  19. Reactor design concepts for radiation processing

    International Nuclear Information System (INIS)

    Berejka, A.J.

    2004-01-01

    During the formative years of irradiation processing, the 1950s and 1960s, there was laboratory and academic interest in the use of this form of energy transfer to initiate polymerization for the manufacture of plastics and in other chemical processes. Studies were often based on low-dose-rate Cobalt-60 systems. The electron beam (EB) accelerator technology of the time was not as yet at the robust and industrially reliable state that it is now at the beginning of the twenty-first century. A series of reactor designs illustrate how an electron beam can be incorporated into reactor vessels for initiating gas and liquid phase polymerizations on a continuous basis. Development of such approaches, which would rely upon contemporary, high current electron beams to initiate polymerization, would help the chemical processing industry alleviate its problems of catalyst disposal and its related environmental concerns. Systems for treating materials in bulk at low doses, such as those typically used for grain disinfection, at high through-put rates, are also illustrated. Simplified shielding is envisioned in each proposed process system

  20. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  1. What do information reuse and automated processing require in engineering design? Semantic process

    Directory of Open Access Journals (Sweden)

    Ossi Nykänen

    2011-12-01

    Full Text Available Purpose: The purpose of this study is to characterize, analyze, and demonstrate machine-understandable semantic process for validating, integrating, and processing technical design information. This establishes both a vision and tools for information reuse and semi-automatic processing in engineering design projects, including virtual machine laboratory applications with generated components.Design/methodology/approach: The process model has been developed iteratively in terms of action research, constrained by the existing technical design practices and assumptions (design documents, expert feedback, available technologies (pre-studies and experiments with scripting and pipeline tools, benchmarking with other process models and methods (notably the RUP and DITA, and formal requirements (computability and the critical information paths for the generated applications. In practice, the work includes both quantitative and qualitative components.Findings: Technical design processes may be greatly enhanced in terms of semantic process thinking, by enriching design information, and automating information validation and transformation tasks. Contemporary design information, however, is mainly intended for human consumption, and needs to be explicitly enriched with the currently missing data and interfaces. In practice, this may require acknowledging the role of technical information or knowledge engineer, to lead the development of the semantic design information process in a design organization. There is also a trade-off between machine-readability and system complexity that needs to be studied further, both empirically and in theory.Research limitations/implications: The conceptualization of the semantic process is essentially an abstraction based on the idea of progressive design. While this effectively allows implementing semantic processes with, e.g., pipeline technologies, the abstraction is valid only when technical design is organized into

  2. High-gain capsule design for the HIDIF project

    International Nuclear Information System (INIS)

    Honrubia, J.J.; Cerrada, J.A.; Gomez, R.

    2000-01-01

    A high-gain capsule has been designed for the HIDIF project. The goal has been to relax the accelerator requirements by using a radiation pulse with lower peak temperature (220 eV) than previous designs (260 eV). The ablator material is beryllium doped with a very low concentration (0.2 atom %) of copper. The capsule absorbs 1.3 MJ and yields, approximately, 450 MJ in I-D simulations. The effect of the opacity of the ablator on capsule performance has been studied in detail. (authors)

  3. Design basis event consequence analyses for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Orvis, D.D.; Haas, M.N.; Martin, J.H.

    1997-01-01

    Design basis event (DBE) definition and analysis is an ongoing and integrated activity among the design and analysis groups of the Yucca Mountain Project (YMP). DBE's are those that potentially lead to breach of the waste package and waste form (e.g., spent fuel rods) with consequent release of radionuclides to the environment. A Preliminary Hazards Analysis (PHA) provided a systematic screening of external and internal events that were candidate DBE's that will be subjected to analyses for radiological consequences. As preparation, pilot consequence analyses for the repository subsurface and surface facilities have been performed to define the methodology, data requirements, and applicable regulatory limits

  4. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository.

  5. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  6. Conceptual design report: Exploratory Shaft Waterline (ESWL) Project B-415

    International Nuclear Information System (INIS)

    Schroeder, B.K.

    1982-03-01

    This project will consist of installing a buried sanitary water transport line from the 200 West Area to the ES site. The size and type of line is to be determined by the A-E during conceptual and Title II design. The present concept is to use an 8-in. PVC line which will meet the required capacity and reliability at minimum cost. This line is not planned for use in the nuclear waste repository in basalt due to the size and source. This will be reconsidered during Title I design of the repository

  7. Design of CR superconducting dipole magnet in German FAIR project

    International Nuclear Information System (INIS)

    Zhu Yinfeng; Wu Weiyue; Wu Songtao; Xu Houchang; Liu Changle

    2008-01-01

    The engineering design of CR (collector ring) superconducting magnet of German FAIR (facility for antiproton and ion research) project is introduced. 3-D model is formed by CATIA, and the magnetic filed of 1/4 magnet is analyzed with ANSYS. Then the displacement and stress of the coil case, liquid helium (LHe) case, especially, the maximal displacement and stress when quenching happens are calculated based on the analysis of magnetic field. These results are necessary for manufacturing the formal magnet. (authors)

  8. Advanced conceptual design report solid waste retrieval facility, phase I, project W-113

    International Nuclear Information System (INIS)

    Smith, K.E.

    1994-01-01

    Project W-113 will provide the equipment and facilities necessary to retrieve suspect transuranic (TRU) waste from Trench 04 of the 218W-4C burial ground. As part of the retrieval process, waste drums will be assayed, overpacked, vented, head-gas sampled, and x-rayed prior to shipment to the Phase V storage facility in preparation for receipt at the Waste Receiving and Processing Facility (WRAP). Advanced Conceptual Design (ACD) studies focused on project items warranting further definition prior to Title I design and areas where the potential for cost savings existed. This ACD Report documents the studies performed during FY93 to optimize the equipment and facilities provided in relation to other SWOC facilities and to provide additional design information for Definitive Design

  9. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  10. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  11. Research and Development Projects with ICT and students as learning designers in Primary Schools

    DEFF Research Database (Denmark)

    Levinsen, Karin; Sørensen, Birgitte Holm; Tosca, Susana

    2014-01-01

    In this paper we present some methodological challenges that emerged during the process of shaping the research design for the comprehensive and complex research project Children as learning designers in a digital school. The project is the realization of our proposal to a research call from...... to the need to strengthen the populations’ digital literacy and 21st century competencies. The call’s scope was research and development projects as pilot school experiments in relation to five selected areas. The selected projects should contribute with new generalizable and practice oriented knowledge...... of how: • ICT supports students learning, • ICT release time for more teaching, and • teachers digital literacy impact on the role of ICT in the educational practice. Further the call required collaboration between universities and university colleges in order to disseminate knowledge and new practices...

  12. MHTGR demonstration role in the NRC design certification process

    International Nuclear Information System (INIS)

    Kelley, A.P. Jr.; Jones, G.

    1986-01-01

    A modular high-temperature gas-cooled reactor (MHTGR) design is being developed by the US HTGR Program. Because of the small size of the individual modules that would make up a commercial facility, it appears feasible to design and construct a single-module demonstration plant within the funding constraints on the public and private-sector program participants. Furthermore, the safety margins that can be made inherent to the design permit full-scale testing that could supply a new basis for demonstrating investment protection and safety adequacy to the public, the US Nuclear Regulatory Commission (NRC), and potential users. With this in mind, a Project Definition Study was sponsored by Gas-Cooled Reactor Associates and the Tennessee Valley Authority to study the potential benefits of undertaking such a demonstration project. One of the areas investigated was the potential benefits of such a facility in supporting the NRC design certification process, which is envisioned as a necessary commercialization step for the MHTGR

  13. Rapid product development: project engineering joined to design engineering in a concurrent engineering context

    Science.gov (United States)

    Bernard, Alain; Ouazzani, A.; Chambolle, F.; Bocquet, Jean Claud

    1997-01-01

    Software tools for designers are mainly based on geometry. Today, many industrial modelers have been rebuilt with C++, or any other object oriented language. This paper proposes to locate the research topics, in order to develop a functional link between project management tools, technical data management and product models. The 'design process' aspect will also be justified through the need of capitalizing designer intent and design history. This is related to different research works of Mechanical Engineering and Logistics Laboratory of Ecole Centrale Paris, and especially two PhD topics.

  14. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  15. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  16. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  17. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  18. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  19. Impediments to User Gains: Experiences from a Critical Participatory Design Project

    DEFF Research Database (Denmark)

    Bossen, Claus; Dindler, Christian; Iversen, Ole Sejer

    2012-01-01

    interviews with participants in a project aimed at developing technology that fosters engaging museum experiences, and rethinking cultural heritage communication. Despite the use of established PD techniques by experienced PD practitioners, a significant number of frustrations relating to the PD process were...... prominent in the research study. Based on these findings, we provide an analysis of impediments for users gains in PD projects: Differences between aims were unresolved, absence of a shared set-up for collaboration and different conceptions of technology.......Actual studies of user gains from involvement in design processes are few, although a concern for users’ gains is a core characteristic of participatory design (PD). We explore the question of user gains through a retrospective evaluation of a critical PD project. We conducted ten qualitative...

  20. Analyzing Team Based Engineering Design Process in Computer Supported Collaborative Learning

    Science.gov (United States)

    Lee, Dong-Kuk; Lee, Eun-Sang

    2016-01-01

    The engineering design process has been largely implemented in a collaborative project format. Recently, technological advancement has helped collaborative problem solving processes such as engineering design to have efficient implementation using computers or online technology. In this study, we investigated college students' interaction and…

  1. Identifying User Needs and the Participative Design Process

    Science.gov (United States)

    Meiland, Franka; Dröes, Rose-Marie; Sävenstedt, Stefan; Bergvall-Kåreborn, Birgitta; Andersson, Anna-Lena

    As the number of persons with dementia increases and also the demands on care and support at home, additional solutions to support persons with dementia are needed. The COGKNOW project aims to develop an integrated, user-driven cognitive prosthetic device to help persons with dementia. The project focuses on support in the areas of memory, social contact, daily living activities and feelings of safety. The design process is user-participatory and consists of iterative cycles at three test sites across Europe. In the first cycle persons with dementia and their carers (n = 17) actively participated in the developmental process. Based on their priorities of needs and solutions, on their disabilities and after discussion between the team, a top four list of Information and Communication Technology (ICT) solutions was made and now serves as the basis for development: in the area of remembering - day and time orientation support, find mobile service and reminding service, in the area of social contact - telephone support by picture dialling, in the area of daily activities - media control support through a music playback and radio function, and finally, in the area of safety - a warning service to indicate when the front door is open and an emergency contact service to enhance feelings of safety. The results of this first project phase show that, in general, the people with mild dementia as well as their carers were able to express and prioritize their (unmet) needs, and the kind of technological assistance they preferred in the selected areas. In next phases it will be tested if the user-participatory design and multidisciplinary approach employed in the COGKNOW project result in a user-friendly, useful device that positively impacts the autonomy and quality of life of persons with dementia and their carers.

  2. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  3. High Temperature Reactors for a proposed IAEA Coordinated Research Project on Energy Neutral Mineral Development Processes

    International Nuclear Information System (INIS)

    Haneklaus, Nils; Reitsma, Frederik; Tulsidas, Harikrishnan

    2014-01-01

    The International Atomic Energy Agency (IAEA) is promoting a new Coordinated Research Project (CRP) to elaborate on the applicability and potential of using High Temperature Reactors (HTRs) to provide process heat and/or electricity to power energy intensive mineral development processes. The CRP aims to provide a platform for cooperation between HTR-developers and mineral development processing experts. Energy intensive mineral development processes with (e.g. phosphate-, gold-, copper-, rare earth ores) or without (e.g. titanium-, aluminum ore) the possibility to recover accompanying uranium and/or thorium that could be developed and used to run the HTR for “energy neutral” processing of the primary ore shall be discussed according to the participants needs. This paper specifically focuses on the aspects that need to be addressed by HTR-designers and developers. First requirements that should be fulfilled by the HTR-designs are highlighted together with the desired outcomes of the research project. (author)

  4. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  5. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  6. Design to Process Capabilities: challenges for the use of Process Capability Databases (PCDBs) in development

    DEFF Research Database (Denmark)

    Eifler, Tobias; Göhler, Simon Moritz; Howard, Thomas J.

    2014-01-01

    capabilities may lead to low yields and a cost/time overrun, conservatively underestimated capabilities affect quality through the reduced design space, or through increased play, rattle/noise, size or weight. A possibility to overcome the subjective assessment of variation in development projects is a Process...... and Maiti (2012), Breyfogle (2003)]. At the same time, information on the achievable manufacturing accuracy or the supplier’s performance is usually inaccurate and largely qualitative in early development stages. Design decisions as well as the choice of manufacturing processes, therefore, often rely...... Capability Data Base (PCDB) offering valuable insight into the actual or expected performance of production processes (Tata and Thornton, 1999). But although the potential benefits as well as initial challenges for the use of PCDBs have been addressed in earlier research, e. g. by Delaney and Phelan (2008...

  7. Design of Nanomaterial Synthesis by Aerosol Processes

    Science.gov (United States)

    Buesser, Beat; Pratsinis, Sotiris E.

    2013-01-01

    Aerosol synthesis of materials is a vibrant field of particle technology and chemical reaction engineering. Examples include the manufacture of carbon blacks, fumed SiO2, pigmentary TiO2, ZnO vulcanizing catalysts, filamentary Ni, and optical fibers, materials that impact transportation, construction, pharmaceuticals, energy, and communications. Parallel to this, development of novel, scalable aerosol processes has enabled synthesis of new functional nanomaterials (e.g., catalysts, biomaterials, electroceramics) and devices (e.g., gas sensors). This review provides an access point for engineers to the multiscale design of aerosol reactors for the synthesis of nanomaterials using continuum, mesoscale, molecular dynamics, and quantum mechanics models spanning 10 and 15 orders of magnitude in length and time, respectively. Key design features are the rapid chemistry; the high particle concentrations but low volume fractions; the attainment of a self-preserving particle size distribution by coagulation; the ratio of the characteristic times of coagulation and sintering, which controls the extent of particle aggregation; and the narrowing of the aggregate primary particle size distribution by sintering. PMID:22468598

  8. Improving Building Performance through Integrating Constructability in the Design Process

    OpenAIRE

    Ezzat Othman, Ayman Ahmed

    2011-01-01

    The traditional procurment approaches commonly adopted in construction projects and the involvement of multitude of various project participants with diverse objectives, skills and interests tended to separate design from construction.This separation obstructs contractors from providing designers with construction feedback and suggestions for design improvement, which ultimately hampers the improvement of building performance. Because of the importance of the design phase and the vit...

  9. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  10. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  11. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  12. Toward automating the database design process

    International Nuclear Information System (INIS)

    Asprey, P.L.

    1979-01-01

    One organization's approach to designing complex, interrelated databases is described. The problems encountered and the techniques developed are discussed. A set of software tools to aid the designer and to produce an initial database design directly is presented. 5 figures

  13. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    2016-01-01

    Internationally, new pedagogical approaches emphasizing collaboration or learning in networks have been developed following the introduction of new technologies, especially the spread of social media. It is interesting to see such pedagogical developments in relation to similar approaches......, developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...... digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...

  14. Possibilities for using software tools in the process of secuirty design

    Directory of Open Access Journals (Sweden)

    Ladislav Mariš

    2013-07-01

    Full Text Available The authors deal with the use of software support the process of security design. The article proposes the theoretical basis of the implementation of software tools to design activities. Based on the selected design standards of electrical safety systems application design solutions, especially in drawing documentation. The article should serve the needs of the project team members in order to use selected software tools and a subsequent increase in the degree of automation of design activities.

  15. EPOS Thematic Core Service Anthropogenic Hazards for SHEER project: maintain, process and manage your project research data

    Science.gov (United States)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Staszek, Monika; Olszewska, Dorota; Urban, Pawel; Jaroslawski, Janusz; Cielesta, Szymon; Mirek, Janusz; Wiszniowski, Jan; Picozzi, Matteo; Solaro, Giuseppe; Pringle, Jamie; Toon, Sam; Cesca, Simone; Kuehn, Daniela; Ruigrok, Elmer; Gunning, Andrew; Isherwood, Catherine

    2017-04-01

    The main objective of the "Shale gas exploration and exploitation induced risks - SHEER" project (Horizon 2020, call LCE 16-2014) is to develop a probabilistic methodology to assess and mitigate the short- and the long-term environmental risks associated with the exploration and exploitation of shale gas. To this end, the SHEER project makes use of a large amount of heterogeneous data of various types. This data, from different disciplines of science e.g. geophysical, geochemical, geological, technological, etc., must be homogenized, harmonized and made accessible exclusively for all project participants. This requires to develop an over-arching structure for high-level multidisciplinary data integration. The bespoke solution is provided by Thematic Core Service Anthropogenic Hazards (TCS AH) developed in the framework of European Plate Observing System Program (https://tcs.ah-epos.eu/, infrastructural projects IS-EPOS, POIG.02.03.00-14-090/13-00 and EPOS IP, H2020-INFRADEV-1-2015-1). TCS AH provides virtual access to a comprehensive, wide-scale and high quality research infrastructure in the field of induced seismicity and other anthropogenic hazards evoked by exploration and exploitation of geo-resources. TCS AH is designed as a functional e-research environment to ensure a researcher the maximum possible freedom for experimentation by providing a virtual laboratory flexible to create own workspace for processing streams. A data-management process promotes the use of research infrastructure in novel ways providing an access to (i) data gathered in the so-called "episodes", comprehensively describing a geophysical process, induced or triggered by human technological activity, which under certain circumstances can become hazardous for people, infrastructure and the environment, (ii) problem-oriented, specific services, with the particular attention devoted to methods analyzing correlations between technology, geophysical response and resulting hazards, (iii) the

  16. Introduction to the Biomass Project: An Illustration of Evidence-Centered Assessment Design and Delivery Capability. CSE Report.

    Science.gov (United States)

    Steinberg, Linda S.; Mislevy, Robert J.; Almond, Russell G.; Baird, Andrew B.; Cahallan, Cara; Dibello, Louis V.; Senturk, Deniz; Yan, Duanli; Chernick, Howard; Kindfield, Ann C. H.

    This paper describes the design rationale for a prototype of an innovative assessment product, and the process that led to the design. The goals of the Biomass project were to demonstrate: (1) an assessment product designed to serve two new purposes in the transition from high school to college; and (2) the capability needed to produce this kind…

  17. Design and Implementation of Software for Resistance Welding Process Simulations

    DEFF Research Database (Denmark)

    Zhang, Wenqi

    2003-01-01

    Based on long time engineering research and dedicated collaborations with industry, a new welding software, SORPAS, has been developed for simulation of resistance projection and spot welding processes applying the powerful finite element method (FEM). In order to make the software directly usabl...... equipment manufacturers...... by engineers and technicians in industry, all of the important parameters in resistance welding are considered and automatically implemented into the software. With the specially designed graphic user interface for Windows, engineers (even without prior knowledge of FEM) can quickly learn and easily operate...... and utilize the software. All industrial users, including welding engineers from DaimlerChrysler, Volkswangen, PSA Peugeot Citroen, VOLVO, Siemens, ABB and so on, have started using the software just after taking a one-day training course. With the user-friendly facilities for flexible geometric design...

  18. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  19. CODP Co operative design process - from urban strategy to detail

    OpenAIRE

    Thunberg, Pär; Philipson, Olof

    2012-01-01

    This project investigates the cooperation between architect and engineer. The context of the investigation is the design of buildings for a sustainable society. The goal of the project is to further the development of the sustainable built society by increasing the knowledge of the interdisciplinary cooperation between these two fields. The focus is a close cooperation already from the start of a project. By involving both fields in the early design stages it is thought that the knowledge and...

  20. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  1. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  2. Procurement strategy formation : (re-)designing rail infrastructure project alliances

    NARCIS (Netherlands)

    Plantinga, Henrico; Dorée, André

    2016-01-01

    Purpose – The purpose of this paper is to provide insights into the reasoning behind the development of new procurement approaches by public sector clients. Design/methodology/approach – A case study approach focuses on a procurement development process by a public sector client. It investigates the

  3. Colour terms in the interior design process

    OpenAIRE

    Attiah, DY; Cheung, TLV; Westland, S; Bromilow, D

    2015-01-01

    Colour is a very important topic that interior designers need to consider. Considerable research has been conducted in the area of colour application in interior design; in this study we are concerned with colour terms in interior design, mainly the terms designers use and know about. Fifteen interior designers with varied professional backgrounds, but based in the Middle East (Saudi Arabia, Dubai, Bahrain, Lebanon, Egypt, and Turkey), were interviewed. Previously we reported that fourteen ou...

  4. Separation process design for isolation and purification of natural products

    DEFF Research Database (Denmark)

    Malwade, Chandrakant R.

    Natural products are defined as secondary metabolites produced by plants and form a vast pool of compounds with unlimited chemical and functional diversity. Many of these secondary metabolites are high value added chemicals that are frequently used as ingredients in food, cosmetics, pharmaceuticals...... and other consumer products. Therefore, process technology towards industrial scale production of such high value chemicals from plants has significant value. Natural products can be obtained in pure form via synthetic or semi-synthetic route, but due to their complicated nature these methods have not been...... developed to the extent of industrial production for majority of natural products. Thus, isolation and purification of such natural products from plants is the most viable way to obtain natural products in pure form. This PhD project is mainly concerned with the design of separation process to isolate...

  5. 512-S Facility, Actinide Removal Process Radiological Design Summary Report

    International Nuclear Information System (INIS)

    Nathan, S.J.

    2004-01-01

    This report contains top-level requirements for the various areas of radiological protection for workers. Detailed quotations of the requirements for applicable regulatory documents can be found in the Radiological Design Summary Report Implementation Guide. For the purposes of demonstrating compliance with these requirements, per Engineering Standard 01064, ''shall consider / shall evaluate'' indicates that the designer must examine the requirement for the design and either incorporate or provide a technical justification as to why the requirement is not incorporated. This report describes how the Building 512-S, Actinide Removal Process meets the required radiological design criteria and requirements based on 10CFR835, DOE Order 420.1A, WSRC Manual 5Q and various other DOE guides and handbooks. The analyses supporting this Radiological Design Summary Report initially used a source term of 10.6 Ci/gallon of Cs-137 as the basis for bulk shielding calculations. As the project evolved, the source term was reduced to 1.1 Ci/gallon of Cs-137. This latter source term forms the basis for later dose rate evaluations

  6. A Web-Based System for Monitoring and Controlling Multidisciplinary Design Projects

    Science.gov (United States)

    Salas, Andrea O.; Rogers, James L.

    1997-01-01

    In today's competitive environment, both industry and government agencies are under enormous pressure to reduce the time and cost of multidisciplinary design projects. A number of frameworks have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. An examination of current frameworks reveals weaknesses in various areas such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, in conjunction with an existing framework, can improve these areas of weakness. This paper describes a system that executes a sequence of programs, monitors and controls the design process through a Web-based interface, and visualizes intermediate and final results through the use of Java(Tm) applets. A small sample problem, which includes nine processes with two analysis programs that are coupled to an optimizer, is used to demonstrate the feasibility of this approach.

  7. Learning and Motivational Processes When Students Design Curriculum-Based Digital Learning Games

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This design-based research (DBR) project has developed an overall gamified learning design (big Game) to facilitate the learning process for adult students by inviting them to be their own learning designers through designing digital learning games (small games) in cross-disciplinary subject...... matters. The DBR project has investigated and experimented with which elements, methods, and processes are important when aiming at creating a cognitive complex (Anderson and Krathwohl, 2001) and motivating learning process within a reusable game-based learning design. This project took place in a co......, or programming provide a rich context for learning, since the construction of artefacts, in this case learning games, enables reflection and new ways of thinking. The students learned from reflection and interaction with the tools alone as well as in collaboration with peers. After analysing the students...

  8. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  9. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  10. Projecting the Future for Design Science Research: An Action‐Case Based Analysis

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2015-01-01

    and theories appears to be a key challenge. In this paper we commence with a DESRIST paper from 2012 that instantiated design principles in an artifact for a bank. That paper included plans and techniques for future use of its principles (propagation), including prescriptions for a five-phase adoption process...... or theories have stimulated many actual projections. We demonstrate these concepts in a case study of propagation: a chemical manufacturer and service provider that adopted the design principles arising from that 2012 DESRIST banking-based design science research. We conclude that generalizability is too well...

  11. Citizen participation, indispensable factor in the generation of urban design projects that respond to the needs of users in Mexico

    Directory of Open Access Journals (Sweden)

    Flavio Franco Muñoz

    2015-09-01

    Full Text Available The relationship between urban design projects with users, it is evident that the importance of public participation in the development of the realization and implementation of these projects; being one of the aspects that aroused the interest in developing the research project "Citizen Participation and rehabilitation of public spaces in the downtown area of Aguascalientes. The cases of Madero and Venustiano Carranza Zaragoza streets" in the which it aims to propose a model for the process of developing an urban design project that incorporates citizen participation effectively, based on the analysis of cases of Madero and Venustiano Carranza Zaragoza streets and analysis theoretical framework of the research project; This research is being done within the Doctorate of Science of the Anthropic Areas, which is being conducted at the Autonomous University of Aguascalientes. The aim expose in this paper is the importance of public participation in a key stage in the process of realization and implementation of a project of urban design, urban planning stage, to substantiate the development stage of the project design city; this proposal derived from the analysis of the knowledge acquired through the research project being conducted within the PhD. The set in our research project to develop the stages in the process of realization and implementation of an urban design project, made up, urban planning, studies to substantiate the project, zoning scheme, the draft, the project executive, project implementation and monitoring, control and evaluation of urban design project realized; allowed to establish the stages where citizen participation is essential, and these stages, identifying the aspects that will be enriched with the knowledge gained from this participation. Considering the participation of citizens from the realization of urban development programs, whether in cities, partial, sectoral or development schemes localities, allow to be

  12. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  13. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    Energy Technology Data Exchange (ETDEWEB)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  14. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    International Nuclear Information System (INIS)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site

  15. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  16. A Case Study of the Energy Design Process Used for A Retail Application

    Energy Technology Data Exchange (ETDEWEB)

    Hayter, S.; Torcellini, P.

    2000-08-28

    Designing and constructing low-energy buildings (buildings that consume 50% to 70% less energy than code-compliant buildings) require the design team to follow a process that considers how the building envelope and systems work together. The High-Performance Buildings Research Project at the National Renewable Energy Laboratory (NREL) developed a technique called the ``energy design process''. This process requires a design team to set energy-efficiency goals at the beginning of the pre-design phase. Detailed computer simulations used throughout the design and construction phases ensure that the building is optimized for energy efficiency and that changes to the design do not adversely affect energy performance. Properly commissioning the building and educating the building operators are the final steps to successfully constructing a low-energy building. NREL's High-Performance Buildings Research project applies the energy design process in the context of real building projects. This paper defines the energy design process and describes how the process was used to optimize the design of the BigHorn Center, a retail building in Silverthorne, Colorado.

  17. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  18. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  19. Achieving teachers' competences in the serious game design process

    OpenAIRE

    Zapušek, Matej; Rugelj, Jože

    2014-01-01

    The main goal of this paper is to present ‘SADDIE’, the methodology for designing educational games that was developed at the Faculty of Education, University of Ljubljana and defines indikative phases for serious game design project that is implemented as a two‐semester project in the course "Application of ICT in education". The methodology is carefully designed and its application has various positive outcomes. Serious game as a final product is just a side effect of the more i...

  20. The Genome of the Netherlands: design, and project goals

    Science.gov (United States)

    Boomsma, Dorret I; Wijmenga, Cisca; Slagboom, Eline P; Swertz, Morris A; Karssen, Lennart C; Abdellaoui, Abdel; Ye, Kai; Guryev, Victor; Vermaat, Martijn; van Dijk, Freerk; Francioli, Laurent C; Hottenga, Jouke Jan; Laros, Jeroen F J; Li, Qibin; Li, Yingrui; Cao, Hongzhi; Chen, Ruoyan; Du, Yuanping; Li, Ning; Cao, Sujie; van Setten, Jessica; Menelaou, Androniki; Pulit, Sara L; Hehir-Kwa, Jayne Y; Beekman, Marian; Elbers, Clara C; Byelas, Heorhiy; de Craen, Anton J M; Deelen, Patrick; Dijkstra, Martijn; den Dunnen, Johan T; de Knijff, Peter; Houwing-Duistermaat, Jeanine; Koval, Vyacheslav; Estrada, Karol; Hofman, Albert; Kanterakis, Alexandros; Enckevort, David van; Mai, Hailiang; Kattenberg, Mathijs; van Leeuwen, Elisabeth M; Neerincx, Pieter B T; Oostra, Ben; Rivadeneira, Fernanodo; Suchiman, Eka H D; Uitterlinden, Andre G; Willemsen, Gonneke; Wolffenbuttel, Bruce H; Wang, Jun; de Bakker, Paul I W; van Ommen, Gert-Jan; van Duijn, Cornelia M

    2014-01-01

    Within the Netherlands a national network of biobanks has been established (Biobanking and Biomolecular Research Infrastructure-Netherlands (BBMRI-NL)) as a national node of the European BBMRI. One of the aims of BBMRI-NL is to enrich biobanks with different types of molecular and phenotype data. Here, we describe the Genome of the Netherlands (GoNL), one of the projects within BBMRI-NL. GoNL is a whole-genome-sequencing project in a representative sample consisting of 250 trio-families from all provinces in the Netherlands, which aims to characterize DNA sequence variation in the Dutch population. The parent–offspring trios include adult individuals ranging in age from 19 to 87 years (mean=53 years; SD=16 years) from birth cohorts 1910–1994. Sequencing was done on blood-derived DNA from uncultured cells and accomplished coverage was 14–15x. The family-based design represents a unique resource to assess the frequency of regional variants, accurately reconstruct haplotypes by family-based phasing, characterize short indels and complex structural variants, and establish the rate of de novo mutational events. GoNL will also serve as a reference panel for imputation in the available genome-wide association studies in Dutch and other cohorts to refine association signals and uncover population-specific variants. GoNL will create a catalog of human genetic variation in this sample that is uniquely characterized with respect to micro-geographic location and a wide range of phenotypes. The resource will be made available to the research and medical community to guide the interpretation of sequencing projects. The present paper summarizes the global characteristics of the project. PMID:23714750

  1. Exploring Biomimicry in the Students' Design Process

    Science.gov (United States)

    Boga-Akyol, Miray; Timur-Ogut, Sebnem

    2016-01-01

    Since the very early days of history, human beings "designed" things by looking at nature. In our days, the use of nature in design has become more systematic and detailed. Although as old as humanity itself, use of nature especially in the field of design still offers novelty and often brings success in solving problems in a sustainable…

  2. Analysis of Design-Build Processes, Best Practices, and Applications to the Department of Defense

    Science.gov (United States)

    2006-06-01

    NAVFAC design-build processes published in trade journals, books , magazines, internet articles, and DoD policy. In their book , Contract Management...literature review concentrates on recent articles published in books , trade magazines, and on the internet to determine design-build processes and...Keith Molenaar ) Design-build projects under the State of California’s Public Contract Code (Legaltips.org, 2006) requires the owner, for example the

  3. UMTRA Ground Water Project management action process document

    International Nuclear Information System (INIS)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards

  4. The Role(s) of Process Models in Design Practice

    DEFF Research Database (Denmark)

    Iversen, Søren; Jensen, Mads Kunø Nyegaard; Vistisen, Peter

    2018-01-01

    This paper investigates how design process models are implemented and used in design-driven organisations. The archetypical theoretical framing of process models, describe their primary role as guiding the design process, and assign roles and deliverables throughout the process. We hypothesise...... that the process models also take more communicative roles in practice, both in terms of creating an internal design rationale, as well as demystifying the black box of design thinking to external stakeholders. We investigate this hypothesis through an interview study of four major danish design......-driven organisations, and analyse the different roles their archetypical process models take in their organisations. The main contribution is the identification of three, often overlapping roles, which design process models showed to assume in design-driven organisations: process guidance, adding transparency...

  5. Optimized design for the scattering with angular limitation in projection electron-beam lithography based electron projection system

    International Nuclear Information System (INIS)

    Xiu, K.; Gibson, J. M.

    2000-01-01

    We investigate the design for a scattering with angular limitation in projection electron-beam lithography (SCALPEL) based electron projection system with a demagnification of -4. By a ''field-flip'' process we can construct a doublet in which the magnetic field has a flat feature in most of the optic column but opposite sign at two sides connected by a sharp transition region. Such a theoretical model can give a near zero chromatic aberration of rotation and much smaller field curvature and astigmatism. Compared with the conventional doublet, the total image blur caused by aberrations at 1/√(2) mm off-axis distance and 1.5 mrad semiangle aperture at the mask side is about only 24 nm for a column length of 400 mm. A shorter column, less than the current 400 mm, is also favored for further reducing the total aberration. These guarantee that we can choose a much larger aperture angle (compared with present 0.5 mrad) and beam current density in such a SCALPEL projection system to achieve higher throughput while still maintaining current resolution. A practical issue for possible magnetic lens design is also discussed. (c) 2000 American Vacuum Society

  6. MATHEMATICAL MODEL DESIGNATED FOR THE ASSESSMENT OF THE INTEGRATED ENVIRONMENTAL LOAD PRODUCED BY A BUILDING PROJECT

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2012-10-01

    The theoretical background of the proposed approach consists in an integrated methodology implemented in the system engineering of construction projects. A building system may be represented as the aggregate of all stages of construction works and participants involved in them. The building system is object-oriented, and it is implemented under the impact of pre-determined environmental factors. The core constituent of the building system represents a Production Technology Module (PTM, or summarized groups of processes. The model formula designated for the assessment of the intensity of the ecological load produced by the construction project onto the environment may be represented as follows:

  7. Modeling and simulation for process and safeguards system design

    International Nuclear Information System (INIS)

    Gutmacher, R.G.; Kern, E.A.; Duncan, D.R.; Benecke, M.W.

    1983-01-01

    A computer modeling and simulation approach that meets the needs of both the process and safeguards system designers is described. The results have been useful to Westinghouse Hanford Company process designers in optimizing the process scenario and operating scheme of the Secure Automated Fabrication line. The combined process/measurements model will serve as the basis for design of the safeguards system. Integration of the process design and the safeguards system design should result in a smoothly operating process that is easier to safeguard

  8. On the Process of Software Design

    DEFF Research Database (Denmark)

    Hertzum, Morten

    2008-01-01

    Software design is a complex undertaking. This study delineates and analyses three major constituents of this complexity: the formative element entailed in articulating and reaching closure on a design, the progress imperative entailed in making estimates and tracking status, and the collaboratio...... disintegrate, but the activities required to avoid this may be costly in terms of scarce resources such as the time of key designers...

  9. Process of system design and analysis

    International Nuclear Information System (INIS)

    Gardner, B.

    1995-01-01

    The design of an effective physical protection system includes the determination of the physical protection system objectives, the initial design of a physical protection system, the evaluation of the design, and, probably, a redesign or refinement of the system. To develop the objectives, the designer must begin by gathering information about facility operations and conditions, such as a comprehensive description of the facility, operating states, and the physical protection requirements. The designer then needs to define the threat. This involves considering factors about potential adversaries: Class of adversary, adversary's capabilities, and range of adversary's tactics. Next, the designer should identify targets. Determination of whether or not nuclear materials are attractive targets is based mainly on the ease or difficulty of acquisition and desirability of the materiaL The designer now knows the objectives of the physical protection system, that is, ''What to protect against whom.'' The next step is to design the system by determining how best to combine such elements as fences, vaults, sensors, procedures, communication devices, and protective force personnel to meet the objectives of the system. Once a physical protection system is designed, it must be analyzed and evaluated to ensure it meets the physical protection objectives. Evaluation must allow for features working together to assure protection rather than regarding each feature separately. Due to the complexity of protection systems, an evaluation usually requires modeling techniques. If any vulnerabilities are found, the initial system must be redesigned to correct the vulnerabilities and a reevaluation conducted

  10. Learning design and feedback processes at scale

    DEFF Research Database (Denmark)

    Ringtved, Ulla L.; Miligan, Sandra; Corrin, Linda

    2016-01-01

    Design for teaching in scaled courses is shifting away from replication of the traditional on-campus or online teaching-learning relationship towards exploiting the distinctive characteristic and potentials of that environment to transform both teaching and learning. This involves consideration...... design and would benefit from learning analytics support? What is the character of analytics that can be deployed to help deliver good design of online learning platforms? What are the theoretical and pedagogical bases inherent in different analytics designs? These and other questions will be examined...

  11. Stakeholder involvement in stages of a participatory process illustrated in interior design cases

    DEFF Research Database (Denmark)

    Vink, Peter; van Rhijn, Gu; Seim, Rikke

    2008-01-01

    In a previous study (Vink et al., 2008) an overview was made of the involvement of different stakeholders in a participatory design process. In this paper this overview was used to describe four participatory design cases focused on improvising productivity, health, and comfort by interior design....... It appeared that this overview is useful to describe the involvement in participatory interior design projects. However, it can only serve as an initial benchmark as much is dependent on the specific case at hand....

  12. Remote Maintenance Design Guide for Compact Processing Units

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.

    2000-07-13

    Oak Ridge National Laboratory (ORNL) Robotics and Process Systems (RPSD) personnel have extensive experience working with remotely operated and maintained systems. These systems require expert knowledge in teleoperation, human factors, telerobotics, and other robotic devices so that remote equipment may be manipulated, operated, serviced, surveyed, and moved about in a hazardous environment. The RPSD staff has a wealth of experience in this area, including knowledge in the broad topics of human factors, modular electronics, modular mechanical systems, hardware design, and specialized tooling. Examples of projects that illustrate and highlight RPSD's unique experience in remote systems design and application include the following: (1) design of a remote shear and remote dissolver systems in support of U.S. Department of Energy (DOE) fuel recycling research and nuclear power missions; (2) building remotely operated mobile systems for metrology and characterizing hazardous facilities in support of remote operations within those facilities; (3) construction of modular robotic arms, including the Laboratory Telerobotic Manipulator, which was designed for the National Aeronautics and Space Administration (NASA) and the Advanced ServoManipulator, which was designed for the DOE; (4) design of remotely operated laboratories, including chemical analysis and biochemical processing laboratories; (5) construction of remote systems for environmental clean up and characterization, including underwater, buried waste, underground storage tank (UST) and decontamination and dismantlement (D&D) applications. Remote maintenance has played a significant role in fuel reprocessing because of combined chemical and radiological contamination. Furthermore, remote maintenance is expected to play a strong role in future waste remediation. The compact processing units (CPUs) being designed for use in underground waste storage tank remediation are examples of improvements in systems

  13. Automated simulation and study of spatial-structural design processes

    NARCIS (Netherlands)

    Davila Delgado, J.M.; Hofmeyer, H.; Stouffs, R.; Sariyildiz, S.

    2013-01-01

    A so-called "Design Process Investigation toolbox" (DPI toolbox), has been developed. It is a set of computational tools that simulate spatial-structural design processes. Its objectives are to study spatial-structural design processes and to support the involved actors. Two case-studies are

  14. Computer Applications in the Design Process.

    Science.gov (United States)

    Winchip, Susan

    Computer Assisted Design (CAD) and Computer Assisted Manufacturing (CAM) are emerging technologies now being used in home economics and interior design applications. A microcomputer in a computer network system is capable of executing computer graphic functions such as three-dimensional modeling, as well as utilizing office automation packages to…

  15. Learning and Motivational Processes When Students Design Curriculum‐Based Digital Learning Games

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2016-01-01

    This design‐based research (DBR) project has developed an overall gamified learning design (big Game) to facilitate the learning process for adult students by inviting them to be their own learning designers through designing digital learning games (small games) in cross‐disciplinary subject...... matters. The DBR project has investigated and experimented with which elements, methods, and processes are important when aiming at creating a cognitive complex (Anderson and Krathwohl, 2001) and motivating learning process within a reusable game‐based learning design. This project took place in a co......, or programming provide a rich context for learning, since the construction of artefacts, in this case learning games, enables reflection and new ways of thinking. The students learned from reflection and interaction with the tools alone as well as in collaboration with peers. After analysing the students...

  16. Inverse axial mounting stiffness design for lithographic projection lenses.

    Science.gov (United States)

    Wen-quan, Yuan; Hong-bo, Shang; Wei, Zhang

    2014-09-01

    In order to balance axial mounting stiffness of lithographic projection lenses and the image quality under dynamic working conditions, an easy inverse axial mounting stiffness design method is developed in this article. Imaging quality deterioration at the wafer under different axial vibration levels is analyzed. The desired image quality can be determined according to practical requirements, and axial vibrational tolerance of each lens is solved with the damped least-squares method. Based on adaptive interval adjustment, a binary search algorithm, and the finite element method, the axial mounting stiffness of each lens can be traveled in a large interval, and converges to a moderate numerical solution which makes the axial vibrational amplitude of the lens converge to its axial vibrational tolerance. Model simulation is carried out to validate the effectiveness of the method.

  17. Hydraulic analysis and optimization design in Guri rehabilitation project

    Science.gov (United States)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  18. Optimized design of total energy systems: The RETE project

    Science.gov (United States)

    Alia, P.; Dallavalle, F.; Denard, C.; Sanson, F.; Veneziani, S.; Spagni, G.

    1980-05-01

    The RETE (Reggio Emilia Total Energy) project is discussed. The total energy system (TES) was developed to achieve the maximum quality matching on the thermal energy side between plant and user and perform an open scheme on the electrical energy side by connection with the Italian electrical network. The most significant qualitative considerations at the basis of the plant economic energy optimization and the selection of the operating criterion most fitting the user consumption characteristics and the external system constraints are reported. The design methodology described results in a TES that: in energy terms achieves a total efficiency evaluated on a yearly basis to be equal to about 78 percent and a fuel saving of about 28 percent and in economic terms allows a recovery of the investment required as to conventional solutions, in about seven years.

  19. The ARAMIS project: a concept robot and technical design.

    Science.gov (United States)

    Colizzi, Lucio; Lidonnici, Antonio; Pignolo, Loris

    2009-11-01

    To describe the ARAMIS (Automatic Recovery Arm Motility Integrated System) project, a concept robot applicable in the neuro-rehabilitation of the paretic upper limb after stroke. Methods, results and conclusion: The rationale and engineering of a state-of-the-art, hardware/software integrated robot system, its mechanics, ergonomics, electric/electronics features providing control, safety and suitability of use are described. An ARAMIS prototype has been built and is now available for clinical tests. It allows the therapist to design neuro-rehabilitative (synchronous or asynchronous) training protocols in which sample exercises are generated by a single exoskeleton (operated by the patient's unaffected arm or by the therapist's arm) and mirrored in real-time or offline by the exoskeleton supporting the paretic arm.

  20. Eco-design pilot project in China - Monsoon offer 2 upgrade

    Science.gov (United States)

    Thai, Roselyne; Liu, Guoguo

    2017-11-01

    During COP21, Schneider Electric has committed that 100% of our new products would be eco-designed to tackle climate change. Launched in 2015, this initiative ecoDesign WayTM was tested on some pilot projects. This project covers the first ecoDesign WayTM pilot in China on an overvoltage or under voltage protective device used in both residential and industrial sectors, called Monsoon. Under the name ecoDesign WayTM, a method and a process have been deployed. The 3 main ecoDesign WayTM phases are: phase 1 - Marketing & Technique handshake, Phase 2 - ecoDesign WayTM follow-up and Phase 3 - Marketing communication. During the project, EIME from Bureau Veritas CODDE and ecoDesign WayTM scorecard from EVEA consulting are two core tools for eco-design implementation. They are respectively used for life cycle assessment and eco-design performance comparison. Thanks to the approach, compared to previous range, pollution emissions and resource depletion along the whole life cycle of product have decreased (reduction of 55% for energy depletion and 85% for water depletion). Global warming potential has dramatically decreased by 98.4% and air pollution by 33%. Meanwhile, the recycling rate has been improved by 18%, and recycled PA is used. The ecoDesign WayTM scorecard is stored as referent document for any customer request. Moreover, customers can access RoHS certificate, REACh declaration, PEP and EoLI in Check a product, an online environmental data repository, available 24/7.